B PLESTERAN
3.50
B PLESTERAN
3.50
10500000 -
B PLESTERAN
3.50
B PLESTERAN
3.50
VOLUME
VOLUME PAS.
PLESTERAN
BATU KALI (M3)
(M2)
126.00
420.00
105.00
350.00
231.00 770.00
VOLUME
VOLUME PAS.
PLESTERAN
BATU KALI (M3)
(M2)
126.00
420.00
210.00
700.00
336.00 1,120.00
RINCIAN ANGGARAN BELANJA
KELUARAN (OUTPUT) KEGIATAN TA 2014
1 2 5
JUMLAH
Palu,
Kuasa Pengguna A
Satker Balai Wilayah Sun
JUMLAH
HARGA
(Rp)
6
Rp 4,237,500.00
#REF!
#REF!
Palu, 2015
Kuasa Pengguna Anggaran
Satker Balai Wilayah Sungai Sulawesi III
Harga Jumlah
No Uraian Satuan Volume Satuan Harga
Rp. Rp.
1 2 3 4 5 6
I Belanja Bahan
Harga Jumlah
No Uraian Satuan Volume Satuan Harga
Rp. Rp.
1 2 3 4 5 6
I Belanja Bahan
Keterangan
8,210,000.00
40,995,000.00
26,295,000.00
10,500,000.00
24,000,000.00
110,000,000.00
Keterangan
8,210,000.00
40,995,000.00
26,295,000.00
10,500,000.00
24,000,000.00
110,000,000.00
DAFTAR HARGA UPAH, BAHAN DAN PERALATAN
HARGA SATUAN
NO URAIAN SATUAN
TERMASUK PAJAK
(Rp)
I UPAH KERJA
1 Pekerja OH Rp 61,200.00
2 Tukang OH Rp 67,320.00
4 Juru Ukur OH Rp 102,000.00
5 Pembantu Juru Ukur OH Rp 52,020.00
6 Juru Gambar OH Rp 52,020.00
7 Operator Komputer OH Rp 52,020.00
8 penjaga Pintu Bln Rp 300,000.00
II HARGA BAHAN
Bronjong 3 Rp 369,600.00
Batu Kali Rp 137,752.73
Amplas Rp 4,443.64
Pipa PVC 4" Rp 55,128.86
Lem Pipa Rp 24,939.91
III ALAT
DAFTAR HARGA UPAH, BAHAN DAN PERALATAN
HARGA SATUAN
NO URAIAN SATUAN
TERMASUK PAJAK
(Rp)
I UPAH KERJA
1 Pekerja OH Rp 53,810.00
2 Tukang OH Rp 75,330.00
Kepala Tukang Rp 78,020.00
4 Juru Ukur OH Rp 105,000.00
5 Pembantu Juru Ukur OH Rp 53,550.00
6 Juru Gambar OH Rp 53,550.00
7 Operator Komputer OH Rp 53,550.00
8 penjaga Pintu Bln Rp 300,000.00
II HARGA BAHAN
1 Bronjong 3 412,700.00
2 Batu Kali 184,000.00
3 Semen 105,500.00
4 Pasir 157,700.00
5 Kerikil 218,300.00
6 Pagar Besi (Pipa Besi 2" & Besi d 12 mm) + Pengangkutan + Pengecetan 746,800.00
7 Cat Genteng/Seng 39,000.00
8 Kwas 17,800.00
9 Cat Minyak 49,700.00
III ALAT
1 Excavator Jam 536,500.00
2 Tronton Unit 3,364,000.00
3 Dump Truck Jam 256,900.00
ANALISA HARGA SATUAN
HARGA HARGA
JUMLAH
NO URAIAN KEGIATAN SATUAN KUANTITAS SATUAN SATUAN / M3
KUANTITAS
(Rp) (Rp)
1 2 3 4 5 6 7
I UPAH
1 Pekerja Hari 0.0240 83.06 53,810.00 1,200.00
1,200.00
II BAHAN
III PERALATAN
1,200.00
Jumlah
HARGA HARGA
JUMLAH
NO URAIAN KEGIATAN SATUAN KUANTITAS SATUAN SATUAN / M3
KUANTITAS
(Rp) (Rp)
1 2 3 4 5 6 7
I UPAH
1 Pekerja 78.75 Hari 0.6250 78.7500 53,810.00 33,600.00
33,600.00
II BAHAN
III PERALATAN
Jumlah 33,600.00
URAIAN PEKERJAAN : BETON COR 1:2:3 (PEMASANGAN PAGAR PENGAMAN)
SATUAN MATA PEMBAYARAN : M
KUANTITAS PEKERJAAN : 15.36
HARGA JUMLAH
JUMLAH
NO URAIAN KEGIATAN SATUAN KUANTITAS SATUAN HARGA
KUANTITAS
(Rp) (Rp)
1 2 3 4 5 6
I UPAH
1 Pekerja Hari 6.000 92.160 Rp 53,810.00 Rp 322,800.00
2 Tukang Hari 1.000 15.360 Rp 75,330.00 Rp 75,300.00
3 Kepala Tukang Hari 0.100 1.536 Rp 78,020.00 Rp 7,800.00
Rp 405,900.00
II BAHAN
1 Semen Zak 6.800 104.448 Rp 105,500.00 Rp 717,400.00
2 Pasir M3 0.540 8.294 Rp 157,700.00 Rp 85,100.00
3 Kerikil M3 0.820 12.595 Rp 218,300.00 Rp 179,000.00
4 Pagar Besi (Pipa Besi 2" & Besi d 12 mm) + M' 1.000 170.000 Rp 746,800.00 Rp 746,800.00
Pengangkutan + Pengecetan
Rp 1,728,300.000
III PERALATAN
2,134,200.00
ALISA HARGA SATUAN
JUMLAH
HARGA
(Rp)
8
4,469,600.00
4,469,600.00
4,469,600.00
JUMLAH
HARGA
(Rp)
8
4,237,500.00
4,237,500.00
4,237,500.00
JUMLAH
HARGA
(Rp)
8
Rp 4,959,100.00
Rp 1,157,000.00
Rp 119,800.00
Rp 6,235,900.00
Rp 11,019,000.00
Rp 1,308,000.00
Rp 2,749,500.00
Rp 126,956,000.00
Rp 142,032,500.00
148,268,400.00
KEMENTERIAN PEKERJAAN UMUM
DIREKTORAT JENDERAL SUMBER DAYA AIR
BALAI WILAYAH SUNGAI SULAWESI III
SATUAN KERJA BALAI WILAYAH SUNGAI SULAWESI III
Jalan Abd. Rahman Saleh No. 230 Palu (94114) Telp. (0451) 482147 Fax (0451) 482101
Rincian Perhitungan
Kode Uraian Suboutput/Komponen/Subkomponen/Akun/Detil Volume Sub Jenis Komponen
Output (Utama/Pendukung)
1 2 3 4 5
Bahan
Pagar Besi (Pipa Besi 2" & Besi d 12 mm) Utama 170 M'
Semen Utama 104.448 Zak
Pasir Utama 8.2944 M3
Kerikil Utama 12.6 M3
Palu,
Kuasa Pe
Satker Balai Wil
Ir. MOCH. K. N
NIP. 19650
NCIAN ANGGARAN BELANJA
LUARAN (OUTPUT) KEGIATAN TA 2017
Rincian Perhitungan
Harga Satuan Jumlah
Jumlah
6 7 8=6*7
175,500,000.00
175,500,000.00
33,468,000.00
253.97 OH 53,810.00 13,666,000.00
15.36 OH 75,330.00 1,157,000.00
1.54 OH 78,020.00 119,000.00
32.00 OH 105,000.00 3,360,000.00
96.00 OH 53,550.00 5,140,000.00
60.00 OH 53,550.00 3,213,000.00
60.00 OH 53,550.00 3,213,000.00
12.00 OK 300,000.00 3,600,000.00
142,032,000.00
170.00 M' 746,800.00 126,956,000.00
104.45 Zak 105,500.00 11,019,000.00
8.29 M3 157,700.00 1,308,000.00
12.60 M3 218,300.00 2,749,000.00
Palu, 2016
Kuasa Pengguna Anggaran
Satker Balai Wilayah Sungai Sulawesi III
NO U RAIAN
(1) (2)
A URAIAN PERALATAN
1 Kapasitas/Tenaga (dalam HP) (HP)
2 Umur (dalam Tahun) (A)
3 Waktu Operasi 1 Tahun (dalam Jam) (W)
4 Harga Setempat (dalam Rp) (B)
5 Kapasitas
(11)
16.00
4.00
2,880.00
19,550,000.00
1,955,000.00
0.39
2,495.75
1,018.23
509.11
26,568.00
2,660.00
7,000.00
7,000.00
44,755.34
47,251.09
47,300.00