BACK UP QUANTITY MC-0

SATUAN KERJA : PELAKSANA JALAN NASIONAL WILAYAH I PROV. SULAWESI TENGGARA NO.MATA PEMBAYARAN : 7.1.(5a) PERHITUNGAN
PELAKSANA KEGIATAN : PEJABAT PEMBUAT KOMITMEN (PPK 1.2) JENIS PEKERJAAN : Beton Struktur fc' 30 Mpa VOLUME
PAKET : PENANGANAN LONGSORAN RUAS JALAN LELEWAWO - LAPAI - LASUSUA SATUAN PENGUKURAN : m3 PEKERJAAN
SEGMEN : LELEWAWO - BATU PUTIH - LAPAI (RUAS 002) HALAMAN : 1/ 1 M3
CANTILEVER WALL STA 0+120 S/D STA 0+250
NO. STRUKTUR PERHITUNGAN VOLUME VOLUME m3
1 SKETSA.
A. LUAS PENAMPANG CANTILEVER WALL

1 Luas (a) = 0.4 + 0.8 x 4 = 2.40 m2


2

2 Luas (b) = 3 x 0.5 = 1.50 m2

(a) 3 Luas Total = 2.400 + 1.500 = 3.90 m2

B. VOLUME CANTILEVER WALL

1 Panjang = 130 m

2 Volume = 3.90 x 130.0 = 507.00 m3


(b)

507.00

Total Volume 507.00 m3


Total Komultif 507.00 m3
Disetujui Oleh : Diperiksa Oleh : Diajukan Oleh :
Direksi Pekerjaan Konsultan Supervisi Kontraktor Pelaksana
KOORDINATOR LAPANGAN XXXXXXXXXXXXX PT. KONSTRUKSI AGUNG
XXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXX, ST
XXXXXXXXXXXXXX XXXXXXXXXXXXXX, ST Quantity
NIP.XXXXXXXXXXXXXXX Chief Inspector (CI)
PEMERINTAH KOTA KENDARI PENYEDIA JASA

DINAS PEKERJAAN UMUM


KONSULTAN SUPERVISI
KOTA KENDARI

BACK UP QUANTITY MC-0


PAKET : C15 PENGASPALAN JALAN DAN JEMBATAN KAWASAN KECAMATAN POASIA (DAK) NO.MATA PEMBAYARAN : 7.1(5a) PERHITUNGAN
RUAS JALAN : JALAN MADUSILA KOTA KENDARI JENIS PEKERJAAN : Beton Mutu Sedang fc' =30 Mpa atau K.350 VOLUME
KONTRAKTOR : PT. PATRIOTJAYA PRATAMA SATUAN PENGUKURAN : m3 PEKERJAAN
KONSULTAN : CV. ANNISA MITRAYASA HALAMAN : 01/03 BETON K - 350
KALKULASI BOX CULVERT STA 2+750
NO. STRUKTUR PERHITUNGAN VOLUME VOLUME m3
1 SKETSA.
A. VOLUME BETON BADAN BOX CULVERT
1 Luas = 0.3 x 3 = 0.900 m2
Volume = 0.900 x 30.00 x 2 = 54.00 m3

2 Luas = 0.3 x 3.6 = 1.080 m2


Volume = 1.080 x 30.00 x 2 = 64.80 m3

3 Luas = 0.3 x 0.3 = 0.045 m2


2
Volume = 0.045 x 30.00 x 4 = 5.40 m3

Ket. : Gambar dalam ukuran mm


(Gambar A. Badan Box Culvert)
TOTAL BADAN = 124.20 m3
B. VOLUME BETON TUMIT BOX CULVERT
1 Luas = 0.4 x 0.70 = 0.280 m2
Volume = 0.280 x 3.60 x 2 = 2.02 m3
TOTAL TUMIT = 2.02

(Gambar B. Tumit Box Culvert)


Ket. : Gambar dalam ukuran mm

Disetujui Oleh : Diperiksa Oleh : Diajukan Oleh :


Direksi PU. Bina Marga Konsultan Supervisi Penyedia Jasa
CV. ANNISA MITRAYASA PT. PATRIOTJAYA PRATAMA

USMAN A.Md JABAL, A.Md RISKY KURNIAWAN. ST


Asisten Teknik Quality/Quantyti Engineer Quantity Engineer
PEMERINTAH KOTA KENDARI PENYEDIA JASA

DINAS PEKERJAAN UMUM


KONSULTAN SUPERVISI
KOTA KENDARI

BACK UP QUANTITY MC-0


PAKET : C15 PENGASPALAN JALAN DAN JEMBATAN KAWASAN KECAMATAN POASIA (DAK) NO.MATA PEMBAYARAN : 7.1(5a) PERHITUNGAN
RUAS JALAN : JALAN MADUSILA KOTA KENDARI JENIS PEKERJAAN : Beton Mutu Sedang fc' =30 Mpa atau K.350 VOLUME
KONTRAKTOR : PT. PATRIOTJAYA PRATAMA SATUAN PENGUKURAN : m3 PEKERJAAN
KONSULTAN : CV. ANNISA MITRAYASA HALAMAN : 02/03 BETON K - 350
KALKULASI
2
C. VOLUME BETON KERB BOX CULVERT
1 Luas = 0.2 x 0.5 = 0.100 m2
Volume = 0.100 x 10.80 x 2 = 2.16 m3

2 Luas = 0.1 x 0.2 = 0.020 m2


Volume = 0.020 x 10.80 x 2 = 0.43 m3

3 Luas = 0.1 x 0.3 = 0.015 m2


2
Volume = 0.015 x 10.80 x 2 = 0.32 m3

(Gambar C. Kerb Box Culvert)


Ket. : Gambar dalam ukuran mm

TOTAL KERB = 2.92 m3


D. VOLUME BETON K-350 (WING WALL)
1 Luas = 3.6 x 0.3 = 1.080 m2
Ket. : Gambar dalam ukuran mm Volume = 1.080 x 0.30 x 4 = 1.30 m3

2 Luas = 3.6 x 3.6 = 6.480 m2


(Gambar D. Wing Wall) 2
Volume = 6.480 x 0.30 x 4 = 7.78 m3
TOTAL = 9.072 m3
TOTAL 138.204 m3
Disetujui Oleh : Diperiksa Oleh : Diajukan Oleh :
Direksi PU. Bina Marga Konsultan Supervisi Penyedia Jasa
CV. ANNISA MITRAYASA PT. PATRIOTJAYA PRATAMA

USMAN A.Md JABAL, A.Md RISKY KURNIAWAN. ST


Asisten Teknik Quality/Quantyti Engineer Quantity Engineer
PEMERINTAH KOTA KENDARI PENYEDIA JASA

DINAS PEKERJAAN UMUM


KONSULTAN SUPERVISI
KOTA KENDARI

BACK UP QUANTITY MC-0


PAKET : C15 PENGASPALAN JALAN DAN JEMBATAN KAWASAN KECAMATAN POASIA (DAK) NO.MATA PEMBAYARAN : 7.1(5a) PERHITUNGAN
RUAS JALAN : JALAN MADUSILA KOTA KENDARI JENIS PEKERJAAN : Beton Mutu Sedang fc' =30 Mpa atau K.350 VOLUME
KONTRAKTOR : PT. PATRIOTJAYA PRATAMA SATUAN PENGUKURAN : m3 PEKERJAAN
KONSULTAN : CV. ANNISA MITRAYASA HALAMAN : 01/03 BETON K - 350
KALKULASI BOX CULVERT STA 1+450
NO. STRUKTUR PERHITUNGAN VOLUME VOLUME m3
1 SKETSA.
A. VOLUME BETON BADAN BOX CULVERT
1 Luas = 0.3 x 3 = 0.900 m2
Volume = 0.900 x 30.00 x 2 = 54.00 m3

2 Luas = 0.3 x 3.6 = 1.080 m2


Volume = 1.080 x 30.00 x 2 = 64.80 m3

3 Luas = 0.3 x 0.3 = 0.045 m2


2
Volume = 0.045 x 30.00 x 4 = 5.40 m3

Ket. : Gambar dalam ukuran mm


(Gambar A. Badan Box Culvert)
TOTAL BADAN = 124.20 m3
B. VOLUME BETON TUMIT BOX CULVERT
1 Luas = 0.4 x 0.70 = 0.280 m2
Volume = 0.280 x 3.60 x 2 = 2.02 m3
TOTAL TUMIT = 2.02

(Gambar B. Tumit Box Culvert)


Ket. : Gambar dalam ukuran mm

Disetujui Oleh : Diperiksa Oleh : Diajukan Oleh :


Direksi PU. Bina Marga Konsultan Supervisi Penyedia Jasa
CV. ANNISA MITRAYASA PT. PATRIOTJAYA PRATAMA

USMAN A.Md JABAL, A.Md RISKY KURNIAWAN. ST


Asisten Teknik Quality/Quantyti Engineer Quantity Engineer
PEMERINTAH KOTA KENDARI PENYEDIA JASA

DINAS PEKERJAAN UMUM


KONSULTAN SUPERVISI
KOTA KENDARI

BACK UP QUANTITY MC-0


PAKET : C15 PENGASPALAN JALAN DAN JEMBATAN KAWASAN KECAMATAN POASIA (DAK) NO.MATA PEMBAYARAN : 7.1(5a) PERHITUNGAN
RUAS JALAN : JALAN MADUSILA KOTA KENDARI JENIS PEKERJAAN : Beton Mutu Sedang fc' =30 Mpa atau K.350 VOLUME
KONTRAKTOR : PT. PATRIOTJAYA PRATAMA SATUAN PENGUKURAN : m3 PEKERJAAN
KONSULTAN : CV. ANNISA MITRAYASA HALAMAN : 02/03 BETON K - 350
KALKULASI
2
C. VOLUME BETON KERB BOX CULVERT
1 Luas = 0.2 x 0.5 = 0.100 m2
Volume = 0.100 x 10.80 x 2 = 2.16 m3

2 Luas = 0.1 x 0.2 = 0.020 m2


Volume = 0.020 x 10.80 x 2 = 0.43 m3

3 Luas = 0.1 x 0.3 = 0.015 m2


2
Volume = 0.015 x 10.80 x 2 = 0.32 m3

(Gambar C. Kerb Box Culvert)


Ket. : Gambar dalam ukuran mm

TOTAL KERB = 2.92 m3


D. VOLUME BETON K-350 (WING WALL)
1 Luas = 3.6 x 0.3 = 1.080 m2
Ket. : Gambar dalam ukuran mm Volume = 1.080 x 0.30 x 4 = 1.30 m3

2 Luas = 3.6 x 3.6 = 6.480 m2


(Gambar D. Wing Wall) 2
Volume = 6.480 x 0.30 x 4 = 7.78 m3
TOTAL = 9.072 m3
TOTAL 138.204 m3
Disetujui Oleh : Diperiksa Oleh : Diajukan Oleh :
Direksi PU. Bina Marga Konsultan Supervisi Penyedia Jasa
CV. ANNISA MITRAYASA PT. PATRIOTJAYA PRATAMA

USMAN A.Md JABAL, A.Md RISKY KURNIAWAN. ST


Asisten Teknik Quality/Quantyti Engineer Quantity Engineer
JO

BACK UP QUANTITY MC-0


SATUAN KERJA : PELAKSANA JALAN NASIONAL WILAYAH I PROV. SULAWESI TENGGARA NO.MATA PEMBAYARAN : 7.1.(5a) PERHITUNGAN
PELAKSANA KEGIATAN : PEJABAT PEMBUAT KOMITMEN (PPK 1.2) JENIS PEKERJAAN : Beton Struktur fc' 30 Mpa VOLUME
PAKET : PENANGANAN LONGSORAN RUAS JALAN LELEWAWO - LAPAI - LASUSUA SATUAN PENGUKURAN : m3 PEKERJAAN
HALAMAN : 5/ 5 M3
RETAINING WALL TIPE 2
NO. STRUKTUR PERHITUNGAN VOLUME VOLUME m3
1 SKETSA.
A. LUAS PENAMPANG RETAINING WALL

1 Luas (a) = 0.4 + 0.8 x 4 = 2.40 m2


2

2 Luas (b) = 2.6 x 0.5 = 1.30 m2

(a) 2 Luas (c) = 0.4 x 1 = 0.40 m2

3 Luas Total = 2.400 + 1.300 + 0.40 = 4.10 m2

B. VOLUME RETAINING WALL

1 Panjang = 370 m
(b)
(c) 2 Volume = 4.10 x 370.0 = 1517.00 m3

1517.00

Total Volume 1517.00 m3


Total Komultif #REF! m3
Disetujui Oleh : Diperiksa Oleh : Diajukan Oleh :
Direksi Pekerjaan Konsultan Supervisi Kontraktor Pelaksana
KOORDINATOR LAPANGAN PT. SURYA PERKASA RAYA Jo. PT. PATRIOTJAYA PRATAMA
PT. ANUGERAH KRIDAPARADANA

JONI, ST SRIANTI AMIR, ST RISMA SEPTRIANI MANSUR, ST


NIP. 19640612 200701 1 004 Chief Inspector (CI) Quantity
JO

BACK UP QUANTITY MC-0


SATUAN KERJA : PELAKSANA JALAN NASIONAL WILAYAH I PROV. SULAWESI TENGGARA NO.MATA PEMBAYARAN : 7.1.(5a) PERHITUNGAN
PELAKSANA KEGIATAN : PEJABAT PEMBUAT KOMITMEN (PPK 1.2) JENIS PEKERJAAN : Beton fc' 10 Mpa VOLUME
PAKET : PENANGANAN LONGSORAN RUAS JALAN LELEWAWO - LAPAI - LASUSUA SATUAN PENGUKURAN : m3 PEKERJAAN
HALAMAN : 5/ 5 M3
KALKULASI VOLUME LANTAI KERJA
NO. STRUKTUR PERHITUNGAN VOLUME VOLUME m3
1 SKETSA.
A. LUAS PENAMPANG LANTAI KERJA STA S/D 370

1 Luas = 3.00 x 370 = 1110.00 m2

B. LUAS PENAMPANG DINDING SUMURAN

1 Luas = 22 x 2.50² x 1 = 4.91 m2


L 7 4

2 Jumlah Dinding Sumuran = 74.00 Bh

3 Luas Total Penampang Dinding Sumuran

= 4.91 x 74.00 = 363.39 m2

C. VOLUME LANTAI KERJA STA 0 S/D 370

1 Tebal = 0.1 m

2 Volume = ( 1110 - 363.39 ) x 0.10 = 74.66 m3

74.66

Total Volume 74.66 m3


Total Komultif #REF! m3
Disetujui Oleh : Diperiksa Oleh : Diajukan Oleh :
Direksi Pekerjaan Konsultan Supervisi Kontraktor Pelaksana
KOORDINATOR LAPANGAN PT. SURYA PERKASA RAYA Jo. PT. PATRIOTJAYA PRATAMA
PT. ANUGERAH KRIDAPARADANA

JONI, ST SRIANTI AMIR, ST RISMA SEPTRIANI MANSUR, ST


NIP. 19640612 200701 1 004 Chief Inspector (CI) Quantity
JO

BACK UP DATA MC-0


SATUAN KERJA : PELAKSANA JALAN NASIONAL WILAYAH I PROV. SULA NO. ITEM : 7.1.(5a)
PELAKSANA KEG: PEJABAT PEMBUAT KOMITMEN (PPK 1.2) PEKERJAAN: Beton Struktur fc'25 Mpa
PAKET : PENANGANAN LONGSORAN RUAS JALAN LELEWAWO - L HALAMAN : 1/ 5
SKETSA GAMBAR

2.00 - 3.00
H

LUAS
DIAMETER ( D ) PENAMPAN TINGGI VOLUME
STATION POSISI G
NO. KETERANGAN
D1 D2 RATA2 LP H V
(Km) (L/R) (m) (m) (m) (m²) (m) (m³ )

1 0+000.00 R 1.90 1.90 1.90 2.84 0.30 0.85

JUMLAH 0.000
JUMLAH S/D HALAMAN INI -
Disetujui Oleh : Diperiksa Oleh : Diajukan Oleh :
Direksi Pekerjaan Konsultan Supervisi Kontraktor Pelaksana
KOORDINATOR LAPANGAN PT. SURYA PERKASA RAYA Jo. PT. PATRIOTJAYA PRATAMA
PT. ANUGERAH KRIDAPARADANA

JONI, ST SRIANTI AMIR, ST RISMA SEPTRIANI MANSUR, ST


NIP. 19640612 200701 1 004 Chief Inspector (CI) Quantity
Disetujui Oleh : Diperiksa Oleh : Diajukan Oleh :
Direksi Pekerjaan Konsultan Supervisi Kontraktor Pelaksana
KOORDINATOR LAPANGAN PT. SURYA PERKASA RAYA Jo. PT. PATRIOTJAYA PRATAMA
PT. ANUGERAH KRIDAPARADANA
JO

JONI, ST BACK UPAMIR,


SRIANTI DATAST MC-0 RISMA SEPTRIANI MANSUR, ST
NIP. 19640612 200701 1 004 Chief Inspector (CI) Quantity
JO

BACK UP DATA MC-0


SATUAN KERJA : PELAKSANA JALAN NASIONAL WILAYAH I PROV. SULA NO. ITEM : 7.1.(5a)
PELAKSANA KEG: PEJABAT PEMBUAT KOMITMEN (PPK 1.2) PEKERJAAN: Beton Struktur fc'25 Mpa
PAKET : PENANGANAN LONGSORAN RUAS JALAN LELEWAWO - L HALAMAN : 1/ 5
SKETSA GAMBAR

2.00 - 4.00
H

LUAS
DIAMETER ( D ) PENAMPAN TINGGI VOLUME
STATION POSISI G
NO. KETERANGAN
D1 D2 RATA2 LP H V
(Km) (L/R) (m) (m) (m) (m²) (m) (m³ )

1 0+000.00 R 1.90 2.10 2.00 3.14 0.30 0.94

JUMLAH 0.000
JUMLAH S/D HALAMAN INI -
Disetujui Oleh : Diperiksa Oleh : Diajukan Oleh :
Direksi Pekerjaan Konsultan Supervisi Kontraktor Pelaksana
KOORDINATOR LAPANGAN PT. SURYA PERKASA RAYA Jo. PT. PATRIOTJAYA PRATAMA
PT. ANUGERAH KRIDAPARADANA

JONI, ST SRIANTI AMIR, ST RISMA SEPTRIANI MANSUR, ST


NIP. 19640612 200701 1 004 Chief Inspector (CI) Quantity
Disetujui Oleh : Diperiksa Oleh : Diajukan Oleh :
Direksi Pekerjaan Konsultan Supervisi Kontraktor Pelaksana
KOORDINATOR LAPANGAN PT. SURYA PERKASA RAYA Jo. PT. PATRIOTJAYA PRATAMA
PT. ANUGERAH KRIDAPARADANA
JO

JONI, ST BACK UPAMIR,


SRIANTI DATAST MC-0 RISMA SEPTRIANI MANSUR, ST
NIP. 19640612 200701 1 004 Chief Inspector (CI) Quantity
JO

BACK UP DATA MC-0


SATUAN KERJA : PELAKSANA JALAN NASIONAL WILAYAH I PROV. SULA NO. ITEM : 7.1.(5a)
PELAKSANA KEG: PEJABAT PEMBUAT KOMITMEN (PPK 1.2) PEKERJAAN: Beton Siklop fc' 15 Mpa
PAKET : PENANGANAN LONGSORAN RUAS JALAN LELEWAWO - L HALAMAN : 1/ 5
SKETSA GAMBAR

2.00 - 4.00
H

LUAS
DIAMETER ( D ) PENAMPAN TINGGI VOLUME
STATION POSISI G
NO. KETERANGAN
D1 D2 RATA2 LP H V
(Km) (L/R) (m) (m) (m) (m²) (m) (m³ )

1 0+000.00 R 1.90 1.90 1.90 2.84 1.40 3.97

JUMLAH 0.000
JUMLAH S/D HALAMAN INI -
Disetujui Oleh : Diperiksa Oleh : Diajukan Oleh :
Direksi Pekerjaan Konsultan Supervisi Kontraktor Pelaksana
KOORDINATOR LAPANGAN PT. SURYA PERKASA RAYA Jo. PT. PATRIOTJAYA PRATAMA
PT. ANUGERAH KRIDAPARADANA

JONI, ST SRIANTI AMIR, ST RISMA SEPTRIANI MANSUR, ST


NIP. 19640612 200701 1 004 Chief Inspector (CI) Quantity
Disetujui Oleh : Diperiksa Oleh : Diajukan Oleh :
Direksi Pekerjaan Konsultan Supervisi Kontraktor Pelaksana
KOORDINATOR LAPANGAN PT. SURYA PERKASA RAYA Jo. PT. PATRIOTJAYA PRATAMA
PT. ANUGERAH KRIDAPARADANA
JO

JONI, ST BACK UPAMIR,


SRIANTI DATAST MC-0 RISMA SEPTRIANI MANSUR, ST
NIP. 19640612 200701 1 004 Chief Inspector (CI) Quantity
JO

BACK UP DATA MC-0


SATUAN KERJA : PELAKSANA JALAN NASIONAL WILAYAH I PROV. SULAWESI T NO. ITEM : 7.1.(5a)
PELAKSANA KEG: PEJABAT PEMBUAT KOMITMEN (PPK 1.2) PEKERJAAN: Beton Struktur fc'20 Mpa
RUAS : 02
PAKET : PENANGANAN LONGSORAN RUAS JALAN LELEWAWO - LAPAI -HALAMAN : 1/ 5
SKETSA GAMBAR

Rumus:
LP = (L1 x H1) - (L2 x H2) - (L3 x H3)

LUAS
LUAS
PENAMPAN VOLUM
LEBAR TINGGI PENAMPAN PANJAN
STATION POSISI G RATA- E
NO. G G KETERANGAN
RATA
L1 L2 L3 H1 H2 H3 LP LPr H V
(Km) (L/R) (m) (m) (m) (m) (m) (m) (m²) (m²) (m) (m³ )

1 0+010.00 L 1.50 0.94 0.35 0.70 0.10 1.15 0.55


0.55 15.00 8.30
2 0+025.00 L 1.50 0.94 0.35 0.70 0.10 1.15 0.55
0.55 25.00 13.84
3 0+050.00 L 1.50 0.94 0.35 0.70 0.10 1.15 0.55
0.55 25.00 13.84
4 0+075.00 L 1.50 0.94 0.35 0.70 0.10 1.15 0.55
0.55 25.00 13.84
5 0+100.00 L 1.50 0.94 0.35 0.70 0.10 1.15 0.55
0.55 20.00 11.07
6 0+120.00 L 1.50 0.94 0.35 0.70 0.10 1.15 0.55

JUMLAH 60.89
JUMLAH S/D HALAMAN INI 60.89
Disetujui Oleh : Diperiksa Oleh : Diajukan Oleh :
Direksi Pekerjaan Konsultan Supervisi Kontraktor Pelaksana
KOORDINATOR LAPANGAN PT. SURYA PERKASA RAYA Jo. PT. PATRIOTJAYA PRATAMA
PT. ANUGERAH KRIDAPARADANA

JONI, ST SRIANTI AMIR, ST RISMA SEPTRIANI MANSUR, ST


NIP. 19640612 200701 1 004 Chief Inspector (CI) Quantity
Disetujui Oleh : Diperiksa Oleh : Diajukan Oleh :
Direksi Pekerjaan Konsultan Supervisi Kontraktor Pelaksana
KOORDINATOR LAPANGAN PT. SURYA PERKASA RAYA Jo. PT. PATRIOTJAYA PRATAMA
PT. ANUGERAH KRIDAPARADANA
JO

JONI, ST BACK
SRIANTI UPSTDATA
AMIR, MC-0 RISMA SEPTRIANI MANSUR, ST
NIP. 19640612 200701 1 004 Chief Inspector (CI) Quantity