Anda di halaman 1dari 15

GAMBAR RENCANA

GAMBAR RENCANA

Propinsi Jawa Tengah

Kabupaten Purworejo

Kecamatan ………………….

Desa ........................

Jenis Prasarana

Jalan Beton

Lokasi :
2
………………………….

JUDUL GAMBAR
1
Potongan melintang

Di gambar oleh :
Pelaksana Kegiatan /
Kader Teknik

#REF!
Diperiksa dan
Disetujui oleh:
#REF!
Lembar…..Dari…..Lembar
Kabupaten : Purworejo Jenis Prasarana
Kecamatan : Bener Take Of Sheet Lokasi
Desa : Volume

Panjang Drainase = 50.00 m


Lebar Drainase = 0.30 m
Tinggi Drainase = 0.50 m
Lebar Atas Pasangan = 0.25 m
Lebar Bawah pasangan = 0.30 m

0.25 0.25

0.50
2
1

0.4 3 0.10

0.30 0.30
0.30

PERHITUNGAN VOLUME :
PERSIAPAN/PEMBERSIHAN LAHAN
P
50.00

GALIAN TANAH DRAINASE

P
0.90 50.00

0.90
PASANGAN BATU

0.25 0.25

V1 = Badan Talud
0.50 Pondasi
0.50 1 V2 = Badan Talud
2
Pondasi

0.4 0.4

0.30 0.30

LANTAI DRAINASE (COR BETON)


P
V3 = 50.00
3 0.10

0.30

PLESTERAN / ACIAN

0.25

P
V = 50.00
0.50

REKAP PEKERJAAN:
No Jenis Pekerjaan
1 Pembersihan
2 Galian Drainase
3 Pasangan Batu
4 cor lantai Drainase
5 Plesteran / Acian

ANALISA PEKERJAAN :

1 1 M2 Pembersihan lapangan dan perataan


SNI 03-2835-2002
Upah
0.1 Hok Pekerja → Pekerja
0.05 Hok Mandor → Mandor

2 1 m3 Menggali tanah biasa sedalam 1 m (Glian drainase)


SNI 2835-2008
Upah
0.75 Hok Pekerja → Pekerja
0.025 Hok Mandor → Mandor

3 1 m3 Memasang pondasi batu belah, campuran 1 pc : 6 pp


Revisi SNI 2836:2008
Upah
1.500 Hok pekerja → pekerja
0.750 Hok tukang batu → tukang batu
0.075 Hok mandor → mandor
Material
1.200 m3 batu belah 15/20 → batu belah 15/20
117.000 kg PC → PC
0.561 m3 PP → PP

4 1 m3 Membuat beton mutu f'c=7,4 Mpa (K100), slum (12+2)cm, w/c= 0,87
Revisi SNI 7394:2008
Upah
1.650 Hok pekerja → pekerja
0.275 Hok tukang batu → tukang batu
0.083 Hok mandor → mandor
Material
247.000 kg semen portland → semen portland
0.621 m 3
pasir beton → pasir beton
0.740 m3 kerikil (maksimum 30 mm) → kerikil (maksimum 30
215.000 ltr air → air
5 1 m2 plesteran 1 pc:5 pp tebal 15 mm
Revisi SNI 2837:2008
Upah
0.300 Hok pekerja → pekerja
0.150 Hok tukang batu → tukang batu
0.010 Hok mandor → mandor
Material
5.184 kg semen portland → semen portland
0.026 m3 pasir pasang → pasir pasang

6 1 m2 acian
Revisi SNI 2837:2008
Upah
0.200 Hok pekerja → pekerja
0.100 Hok tukang batu → tukang batu
0.010 Hok mandor → mandor
Material
3.250 kg semen portland → semen portland

7 1 m3 Mengangkut material/hasil galian dengan jarak horizontal 100m


PERMEN PUPR No.28 Tahun 2016

Langsir Pasir Pasang =


batu belah 15/20 =

Upah
0.6000 Hok Tenaga Langsir → Tenaga Langsir

Kebutuhan bahan dan tenaga kerja

Jenis Material HOK Tenaga Kerja


batu belah 15/20 24 M³ Pekerja Tak Terlatih
semen portland 550 Zak Pekerja Terlatih
pasir pasang 14 M³ Tukang
air 0 M³ Mandor
Purworejo, 30 Desember 2017
Dibuat oleh :
Pelaksana Kegiatan/ Kader Teknik

(...........................................)
: Drainase
: Dusun……. Rt 01/01
: P:50 m x L:0.80 m x T :0.50 m

0.50

0.40

L JMH
x 0.90 x 1 = 45 m²

L T JMH
x 0.90 x 0.90 x 1 = 40.50 m³
P L T JMH
50.00 x 0.15 x 0.50 x 1 = 3.75 m³
50.00 x 0.30 x 0.40 x 1 = 6.00 m³
50.00 x 0.15 x 0.50 x 1 = 3.75 m³
50.00 x 0.30 x 0.40 x 1 = 6.00 m³
19.50 m³

L T JMH
x 0.30 x 0.10 x 1 = 1.50 m³

L T JMH
+ 0.25 + 0.50 + 2.00 = 52.75 m³

Volume
45.00 M²
41.00 M³
20.00 M³
2.00 M³
53.00 M³

= 0.1 x 45 = 4.5 Hok


= 0.05 x 45 = 2.25 Hok

= 0.75 x 41 = 30.75 Hok


= 0.025 x 41 = 1.025 Hok

= 1.500 x 20.00 = 30.00 Hok


= 0.750 x 20.00 = 15.00 Hok
= 0.075 x 20.00 = 1.50 Hok

= 1.200 x 20.00 = 24.00 m3


= 117.000 x 20.00 / 50 = 46.80 zag
= 0.561 x 20.00 = 11.22 m3

= 1.650 x 2.00 = 3.30 Hok


= 0.275 x 2.00 = 0.55 Hok
= 0.083 x 2.00 = 0.17 Hok

= 247.000 x 2.00 / 50 = 494.00 Zag


= 0.621 x 2.00 = 1.24 m3
= 0.740 x 2.00 = 1.48 m3
= 215.000 x 2.00 x 0.001 = 0.43 m3
= 0.300 x 53.00 = 15.9 Hok
= 0.150 x 53.00 = 7.95 Hok
= 0.010 x 53.00 = 0.53 Hok

= 5.184 x 53.00 / 50 = 5.50 zag


= 0.026 x 53.00 = 1.38 m3

= 0.200 x 53.00 = 10.60 Hok


= 0.100 x 53.00 = 5.30 Hok
= 0.010 x 53.00 = 0.53 Hok

= 3.250 x 53.00 / 50 = 3.45 Zag

14.000 M³
24.000 M³ +
38.000 M³
Tenaga langsir ada ketika b
membutuhkan tenaga langsir
bisa sampai di tempat ti
= 0.6000 x 38.000 = 22.800 Hok menganggarkan tenaga

35 Hok
83.00 Hok
29.00 Hok
6.00 Hok
Desember 2017

tan/ Kader Teknik

.......................)
Tenaga langsir ada ketika benar benar
membutuhkan tenaga langsir, ketika matrial
bisa sampai di tempat tidak bisa
menganggarkan tenaga langsir..!
RENCANA ANGGARAN BIAYA DANA DESA (RAB DD)
DESA ………... KECAMATAN ………………..
TAHUN ANGGARAN 2020

Bidang : Pelaksanaan Pembangunan Desa


Sub Bidang : Pekerjaan Umum dan Penataan Ruang
Kegiatan :
Waktu Pelaksanaan : ………………………
Keluaran : Terbangunnya Drainase ………………..
Ukuran/Dimensi : P:50 m x L:0.80 m x T :0.50 m
Satua
Harga Jumlah (Rp)
No Uraian Volume n
Satuan (Rp)
1. BAHAN
1 batu belah 15/20 24 M³ 297,500 7,140,000
2 semen portland 550 Zak 59,000 32,450,000
3 pasir pasang 14 M³ 295,200 4,132,800
4 air 0 M³

Sub Total 1) 43,722,800


2. ALAT
1 Ember 10 Bh 12,500 125,000
2 Keranjang 12 Bh 15,500 186,000
3 Angkong 1 Bh 587,500 587,500
4 Prasasti 1 Bh 300,000 300,000
5 Papan nama pekerjaan 1 Bh 150,000 150,000
Sub Total 2) 1,348,500
3. ONGKOS ANGKUT
1 Ongkos angkut pasir pasang 14 M³ 49,500 693,000
2 Ongkos angkut split 24 M³ 49,500 1,188,000

Sub Total 3) 1,881,000


4. UPAH
1 Pekerja Tak Terlatih 35 Hok 48,500 1,697,500
2 Pekerja Terlatih 83 Hok 58,000 4,814,000
3 Tukang 29 Hok 81,300 2,357,700
4 Mandor 6 Hok 86,800 520,800
Sub Total 4) 9,390,000
5. BIAYA OPERASIONAL
1 Honor TPK 1,260,000
Ketua 1 420,000 420,000
Sekretaris 1 420,000 420,000
Anggota 1 420,000 420,000

2 Honor TTK 825,000


Ketua 1 300,000 300,000
Sekretaris 1 275,000 275,000
Anggota 1 250,000 250,000

3 ATK 290,000
HVS 70 gram 4 rim 49,000 196,000
Snelhecter plastik 10 bh 9,400 94,000

4 Benda Pos 108,000


Materai 3000 12 bh 3,000 36,000
Materai 6000 12 bh 6,000 72,000

5 Cetak dan penggandaan 300,900


Fotocopi 899 Lbr 300 269,700
Jilid 3 10,400 31,200
Sub Total 5) 2,783,900
Jumlah (Rp) 56,342,300
BOP 1,125,000
Jumlah Total 57,467,300

Disetujui Purworejo, …………….. 2020


Kepala Desa …………………… Kaur Perencanaan