Anda di halaman 1dari 7

P

f'c = --------
phi/4 D2

275000
= ------------
3,14/4*100*100

= 35.03184713 N/mm2

3503184.713
3503.184713
275000
7850
f'c 35.03185
f'c 357.2268
3771
7850
0.480382166
fcc

standard deviasi

cylinder strength

x1-xrt (x1-xrt)2
357.47 11.13833 124.0625
349.42 3.088333 9.537803
303.84 -42.4917 1805.542
311.44 -34.8917 1217.428
319.04 -27.2917 744.8351
387.4 41.06833 1686.608
402.59 56.25833 3165
372.21 25.87833 669.6881
357.47 11.13833 124.0625
334.23 -12.1017 146.4503
281.06 -65.2717 4260.39
379.81 33.47833 1120.799
4155.98 15074.4 1370.4
xrt 346.3317
n 12
sd 37.01892

x xrt-(1,645*sd)
285.4355 kg/cm2 kuat tekan beton yang dipakai
230000
6716.656
n/mm2 mpa 34.24323
kg/cm2 mpax10,1972 349.1851

C0*C1*C2*f'c
0,92*0,87*f'c
285.9243 kg/cm2

= faktor koreksi streng * crushing streng * korelasi diameter ke normal diameter


data sofoco
PERHITUNGAN PEMERIKSAAN HASIL PEKERJAAN

DIVISI
BETON K.300

SEGMEN STA P L L RATA L DIHITUNG LUAS SEGMEN

I 0+ 000 4.05
0+ 050 4.01
0+ 065 120 4.02 3.996 3.996 479.52
0+ 100 4.00
0+ 120 3.90

II 0+ 120 4.03
0+ 150 4.02
0+ 200 120 4.00 4.014 4 480
0+ 215 4.02
0+ 240 4.00

III 0+ 240 4.00


0+ 250 4.00
0+ 255 120 4.00 4 4 480
0+ 350 4.00
0+ 360 4.00

IV 0+
HASIL CORE DRILL T RATA TDIHITUNG
1 2 3 4

25.10 25.10 25.00 25.10 25.08 25.00

25.20

25.10
VOLUME SEGMEN FC

11,988.00 295