PENGASPALAN JALAN
REKAPITULASI Pembulatan
Batu Pecah 2/3 m3 11.70 12.00
Batu Pecah 1/2 m3 7.61 8.00
Batu Pecah 0,5 - 1 m3 10.85 11.00
Abu batu m3 9.68 10.00
Aspal KW 1 Drum 23.81 24.00
Kayu Bakar m3 22.46 23.00
Gilasan Hari 3.89 4.00
Pekerja HOK 154.32 154.00
Mandor HOK 5.59 6.00
Juru Godog HOK 1.97 2.00
REKAPITULASI
Batu 10/15 0.00 1
Batu Pecah 5/7 0.00 1
Batu Pecah 3/5 0.00 8
Batu Pecah 2/3 23.70 10
Batu Pecah 1/2 15.61 6
Batu Pecah 0,5 - 1 / Ciping 15.10 3
Abu Batu 12.93 2
Aspal 155 Kg 39.10 14
Pasir Urug 0.00 1
Pekerja 84.83 77
Mandor 2.16 2
Tukang aspal 0.00 1
Gilasan 1.95 2
1. Bidang :
2. Kegiatan : .
3. Waktu Pelaksanaan : ..
Rincian pendanaan :
HARGA SATUAN
NO URAIAN SATUAN VOLUME JUMLAH ( Rp )
( Rp )
1 2 3 4 5=3x4
1 BAHAN
1 Batu Pecah 2/3 m3 12.00 250,000 3,000,000
2 Batu Pecah 1/2 m3 8.00 250,000 2,000,000
3 Batu Pecah 0,5 - 1 / Ciping m3 11.00 250,000 2,750,000
4 Abu Batu m3 10.00 250,000 2,500,000
5 Aspal 155 Kg Drum 24.00 1,800,000 43,200,000
6 Kayu Bakar m3 23.00 125,000 2,875,000
JUMLAH 64,505,000
Disetujui/mengesahkan . Tanggal .