Hitungan DPT
Hitungan DPT
KEGIATAN :
PEKERJAAN : 0
KABUPATEN : BADUNG
1 #REF! M3 Err:509
Total M3 Err:509
Sub Total M3 Err:509
Rai Twistyanti Raharja, ST, MT. Ir. I Wayan Sukarma Putu Joni Andika, ST.
Penata Supervision Engineer Site Manager
NIP. 19870216 200901 2 003 `
KET.
Kontraktor
ARBALI BINAKARYA
MATA PEMBAYARAN :
ITEM PEKERJAAN :
SATUAN :
H1
H2
PANJANG H1 Awal H1 Akhir Rata - B0 B1
NO STATION L/R Rata
(M) (M) (M) (M) (M) (M) (M)
H
A B C D E F G I J
1 0 + 000.00 s/d 0 + 005.00 L 5.00 3.00 3.00 3.00 2.00 0.30 1.00
2 0 + 005.00 s/d 0 + 015.00 L 10.00 3.00 3.00 3.00 2.00 0.30 1.00
3 s/d L
4 s/d L
5 s/d L
6 s/d L
7 s/d L
8 s/d L
9 s/d L
10 s/d L
11 s/d L
12 s/d L
13 s/d L
14 s/d L
15 s/d L
16 s/d L
17 s/d L
18 s/d L
19 s/d L
20 s/d L
Sub Total 15.00
Total 15.00
B0
H1
B2
101.25
101.25