DAFTAR HARGA SATUAN BAHAN BANGUNAN

PEKERJAAN : -
LOKASI : -
TAHUN ANGGARAN : -

HARGA
NO. J E N I S B A H A N SATUAN (Rp)

I BAHAN DASAR
1 BATU KALI Bulat Utuh m3
Bulat Belah m3 190,000
Pecah 10/15 m3 190,000
Pecah 5/7 m3 200,000
Pecah 3/5 m3 198,300
2 KERIKIL Timbunan Pilihan m3 114,000
Sawur / Koral m3 84,200
Beton 0,5/1 m3 101,600
Beton 1/2 m3 214,850
Beton 2/3 m3 206,000
Biasa m3
Tras Giling m3
3 BATU BATA ex lokal bh 650
Concrete Blok (CB 15) / Batako (Lubang2) bh
Batako Padat bh
Rosteer beton cetak 12 x 11 x 24 cm bh
Rosteer tanah liat bakar 12 x 11 x 24 cm bh

4 PASIR Urug m3 105,000


Pasang m3 185,000
Beton m3 185,000
5 TANAH Padas m3 42,500
Liat m3
Subur m3
6 KAPUR Pasang m3 198,000
Semen Merah m3
7 PORTLAND CEMENT
Gresik 40 kg zak 62,000
Holcim 40 kg zak 62,000
Holcim 50 kg zak
Cibinong 40 kg zak
Cibinong 50 kg zak
Portland Cement kg 1,338
Semen Putih 40 kg zak
Semen Putih 50 kg zak
Semen warna kg 1,755

CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)

II B A H A N P E N U T U P A T A P
1 SIRAP (100 lbr) pak
Sirap asbes semen m2

2 GENTENG BETON
Genteng Beton Warna standard bh
Genteng Beton Warna Special bh
Genteng Beton Warna Khusus bh
Kerpus Beton Warna Standard bh 4,900
Kerpus Beton Warna Special bh
Kerpus Beton Warna Khusus bh
Genteng beton ex. Mutiara bh
Genteng beton flat ex. Mutiara bh
Genteng press beton polos tipe nusantara 2,400

3 GENTENG TANAH LIAT


Vlaam bh 400
Kodok bh
Kodok Glasur bh
Nok kerpus Kodok bh
Nok kerpus Kodok Glasur bh
Plentong super besar 18 bh/m2 bh
Nok kerpus plentong super bh 2,400
Kerpus press beton 4,900
Kerpus press mantili 5,700
Kerpus press tipe soka kebumen 5,700
Genteng lokal tipe plenthong
Genteng kebumen tipe plentong kecil
Genteng kebumen tipe morando
Genteng kebumen tipe kodok
Genteng keramik ex. Kanmuri
Genteng keramik ex. KIA KW I
Genteng kerpus lokal
Genteng kerpus kebumen
Genteng kerpus keramik
Genteng soka kebumen plentong besar 1,900
Genteng soka kebumen plentong kecil 1,700
Genteng press mantili besar 1,450
Genteng press mantili kecil 1,350

4 GENTENG KACA
Vlaam tebal 2 mm bh
Vlaam tebal 3 mm bh
Kodok tebal 2 mm bh
Kodok tebal 3 mm bh

CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)

5 ASBES GELOMBANG BESAR


. 200 cm X 102 cm X 5 mm bh
. 225 cm X 102 cm X 5 mm bh
. 250 cm X 102 cm X 5 mm bh
. 200 cm X 102 cm X 6 mm bh
. 225 cm X 102 cm X 6 mm bh
. 250 cm X 102 cm X 6 mm bh
Asbes Gelombang Kecil
. 150 cm X 105 cm X 4 mm bh 40,000
. 180 cm X 105 cm X 4 mm bh 46,000
. 210 cm X 105 cm X 4 mm bh 52,000
. 240 cm X 105 cm X 4 mm bh 60,000
. 270 cm X 105 cm X 4 mm bh 68,000
. 300 cm X 105 cm X 4 mm bh 76,000
.(2,25x0,92 m) x 5 mm bh 65,000
(2,00x0,92 m) x 5 mm bh 57,700
NOK Jabes nok
. Kerpus Genteng bh
. Stel Besar bh
. Paten Besar bh
Nokstel gelombang harflex
. Stel Besar bh 31,400
. Patent Besar bh
. Plat besar bh

6 ASBES PLAT
. 100cm X 100 cm X 3 mm bh 17,300
. 100cm X 100 cm X 4 mm bh
. 50 cm X 200 cm X 3 mm bh
. 40 cm X 200 cm X 3 mm bh

7 FIBRE GLASS (JABES)


180 X 92 cm bh
200 X 92 cm bh
250 X 92 cm bh
180 X 105 cm bh
210 X 105 cm bh
250 X 105 cm bh
8 SENG PLAT
BJLS 0,18 lebar 55 cm m'
BJLS 0,20 lebar 55 cm m'
BJLS 0,20 lebar 90 cm m'
BJLS 0,20 lebar 120 cm m'
BJLS 0,28 lebar 55 cm lbr 33,000
BJLS 0,30 lebar 55 cm m'
BJLS 0,25 lebar 55 cm m'

CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)

BJLS 0,30 lebar 55 cm m'


BJLS 0,30 lebar 60 cm m' 23,900
BJLS 0,30 lebar 90 cm m' 34,700
9 SENG GELOMBANG
BJLS 0,18 panjang 180 cm lbr
BJLS 0,20 panjang 180 cm lbr 47,900
BJLS 0,30 panjang 180 cm lbr 59,500
BJLS 0,30 panjang 240 cm lbr 79,300
BJLS 0,40 panjang 180 cm lbr
Seng gelombang 3 x 6" BJLS.20, 2,4 x 0,8 lbr 50,400
10 ASPAL BITUMEN
Atap Onduvila lbr
Nok Onduvila lbr
Skrup pcs
Lisplank GRC 2/20 m'

III B A H A N K A Y U
1 JATI Papan m3
Balok/pesagen m3
Reng m3
Balok kelas II m3 13,537,100
Balok kelas III m3 11,454,500
Papan kelas II m3 14,578,500
Papan kelas III m3 12,495,800

2 KAMPER Papan m3 7,561,900


Balok/pesagen m3 7,318,100

3 KRUING Papan m3 5,800,000


Balok/pesagen m3 5,600,000

4 MERANTI Papan m3 4,600,000


Balok/pesagen m3 4,100,000
Papan Begesting m3

5 KAYU TAHUN BEKISPapan m3


Balok/pesagen m3 2,000,000

6 BENGKIRAI Papan m3 10,300,000


Balok/pesagen m3 9,300,000

7 SENGON Papan m3 3,000,000


Balok/pesagen m3 2,500,000

8 DOLKEN Sedang 8 - 10 x 400 cm bt 18,000


Kecil 6 - 7 x 400 cm bt

CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)

Besar 10 - 12 x 400 cm bt
Kayu cetakan m3
Kayu bakar m3
Bambu bt 13,200
Kayu list m'
Kayu list profil m'
Anyaman Bambu m2
Bilik Bambu m2 20,000
Reng bangkirai 2/3 m 3,300
Reng bangkirai m3 5,227,200
Reng jati 2/3 kelas III m 5,700
Reng jati kelas II m3 10,290,000
Reng jati kelas III m3 8,712,300
Kayu usuk bangkirai m3 8,500,000
Kayu usuk kruing m3 5,400,000
Reng Kamfer m3 5,800,000

IV BAHAN PENUTUP DINDING / LANTAI


1 UBIN (TEGEL BIASA)
PC polos 30 X 30 cm m2
20 X 20 cm m2
PC warna 30 X 30 cm m2
20 X 20 cm m2
Teraso 30 X 30 cm m2
2 TEGEL PLINT
PC warna 10 X 20 cm bh
PC abu-abu 15 x 20 bh

3 POLIS UBIN Lantai/badan m'


Plint m'
Trap m'

4 UBIN PORSELIN
Lokal 11 X 11 putih dos
11 X 11 warna dos
Lokal 15 X 15 putih dos
15 X 15 warna dos
5 MOZAIK PORSELIN
10 X 20 cm m2
15 X 15 cm m2
20 X 20 cm m2
20 X 25 cm m2

6 Keramik 30 X 30 cm polos m2 41,300


20 X 20 cm KM/WC m2 42,100
33 x 33 cm m2

CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)

25 x 25 cm m2
15 x 20 cm m2
Keramik anti slip 38,000
Keramik warna pola 30/30 m2 42,100
Keramik warna pola 40/40 m2 52,800
Keramik dinding 20/25 m2 44,600
Keramik dinding 20/20 m2 44,600
Keramik dinding list 5/20 bh 4,000
Keramik plin 10/20 bh 3,000
Karpet m2 110,000
7 Parquet Jati m2 160,000
Wallpaper m2 35,000
8 Batu Candi m2 99,100
Batu andesit m2 150,000
Batu andesit alur m2 170,000
9 Batu Tempel Hitam m2

10 GRANITO 40 x 40 cm m2 157,000
30 x 30 cm m2
11 Marmer m2 98,000

12 Keramik lantai 20/20 ex. KIA ( textur) m2


Keramik lantai 30/30 KW I ex. Mulia ( Polish ) m2
Keramik lantai 30/30 KW II ex. Mulia ( un polish ) m2
Keramik lantai 40/40 ex. Hercules m2
Keramik lantai 40/40 ex. Roman m2
Keramik lantai 60/60 ex. Hercules m2
Keramik lantai 60/60 ex. Roman m2
Keramik dinding 10/20 ex. KIA m2
Keramik dinding 20/20 ex. KIA m2
Keramik dinding 20/25 ex. KIA m2
Keramik dinding 25/40 ex. KIA m2
Marmer Tulungagung m2
Marmer lampung m2
Marmer Itali m2
Granito 60x60 polished ex. Innesa (lokal) m2
Granito 60x60 polished ex. Esenza (Import) m2
Batu palimanan lempeng potong pabrikasi m2
Batu candi m2 99,100
Batu andesit m2
Batu lempeng acak ( tidak beraturan) m2
Batu lempeng potong pabrikasi m2

13 Homogenous Tile 60/60 Ex. Indogress TPZ


Plint Homogenous Tile 10/60 Ex. Indogress TPZ
Step Nosing 10/30

CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)

V.BAHAN CETAK
1 BUIS BETON Ø 10 cm - 100 cm bh
Ø 20 cm - 100 cm bh 27,250
Ø 30 cm - 100 cm bh 42,100
Ø 40 cm - 100 cm bh 52,000
Ø 50 cm - 100 cm bh 77,650
Ø 60 cm - 100 cm bh 115,700
Ø 70 cm - 100 cm bh
Ø 80 cm - 100 cm bh
Ø 100 cm - 100 cm bh 229,700
Ø 80 cm - 50 cm bh 78,500
Ø 90 cm - 50 cm bh 86,700
Ø 100 cm - 50 cm bh 114,800
U 10 cm - 100 cm bh
U 15 cm - 100 cm bh
U 20 cm - 100 cm bh 37,150
U 30 cm - 100 cm bh 47,100
U 50 cm - 100 cm bh

2 LUBANG ANGIN (ROSTER) PC + PASIR


10 X 20 cm bh 6,000
20 X 20 cm bh
25 X 25 cm bh
30 X 30 cm bh
15 X 25 cm bh
15 X 30 cm bh

VI B A H A N B E S I
1 BESI BETON besi beton polos kg 10,000
besi beton prestress kg
besi beton ulir kg 10,000

2 BESI PLAT Besi Strip kg 4,100

3 BESI PROFIL Besi Profil kg 11,500


Besi Profil WF kg 14,800
4 JARING - JARING BAJA
Diameter 4 - 15 kg
Diameter 6 - 15 kg
M-8 (size 5,4 x 2,1 m2) lbr
Kawat Bronjong kg
5 BESI SIKU L 40 X 40 X 4 btg
L 50 X 50 X 5 btg
L 60 X 60 X 6 btg

CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)

L All Size kg 11,550

6 KAWAT - Ikat beton/bendrat kg 15,700


- Harmonika 12 X 45 mm m2
- Harmonika 12 X 24 mm m2
- Harmonika 14 X 30 mm m2
- Harmonika 14 X 35 mm m2
- Kawat Nyamuk Nylon m2
- Kawat Kasa m2
- Saringan pasir m2
- Kawat loket m2
- Kawat duri rol
- Kawat duri kg
- Kawat bronjong kg
- Kawat las kg 26,000

7 LAIN-LAIN
Paku asbes kg 23,100
Paku sekrup asbes bh 18,100
Paku crampon bh
Dynabolt ukuran 8 mm x 65 mm bh
Baut gording kg
Hollow Galvanis 2.4. 400 bt
Hollow Galvanis 4.4. 400 bt
Baja Ringan C.75 ex. Taso bt
Skrup Fixer bh 750
Sealant bh 50,000
Venetions Blinds atau Vertical Blinds (tirai) m2 95,000

VII B A H A N P I P A
1 Pipa PVC SII SCJ , S - 12,5 (10 bar)
Pipa PVC DN 20 ( ½" ) AW JIS btg 14,800
Pipa PVC DN 25 ( ¾" ) AW JIS btg 20,600
Pipa PVC DN 32 ( 1" ) AW JIS btg 28,900
Pipa PVC DN 40 ( 1½" ) btg 24,700
Pipa PVC DN 63 ( 2" ) btg 48,700
Pipa PVC DN 90 ( 3" ) btg -
Pipa PVC DN 110 ( 4" ) btg 152,800
Pipa PVC DN 160 ( 6" ) btg -
Pipa PVC DN 200 ( 8" ) btg -
Pipa PVC DN 250 ( 10" ) btg -
Pipa PVC DN 315 ( 12" ) btg -
Pipa PVC Ø 4" (AW - SCJ) 4 m 152,800
Pipa PVC Ø 2" (AW - SCJ) 4 m 48,700

CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)

Pipa PVC Ø 1 1/2" (AW - SCJ) 4 m 24,700


Pipa PVC Ø 1" (AW - SCJ) 4 m 28,900
Pipa PVC Ø 3/4" (AW - SCJ) 4 m 20,600
Pipa PVC Ø 1/2" (AW - SCJ) 4 m 14,800

2 Pipa Medium B Galvanis - SII


Pipa Medium B Galvanis DN ½" btg 89,200
Pipa Medium B Galvanis DN 25 ( ¾" ) btg 109,000
Pipa Medium B Galvanis DN 32 ( 1" ) btg 163,600
Pipa Medium B Galvanis DN 50 ( 1½" ) btg 287,600
Pipa Medium B Galvanis DN 63 ( 2" ) btg 361,900
Pipa Medium B Galvanis DN 2½" btg -
Pipa Medium B Galvanis DN 90 ( 3" ) btg 565,200
Pipa Medium B Galvanis DN 110 ( 4" ) btg 555,300
Pipa Medium B Galvanis DN 160 ( 6" ) btg 1,259,500
Pipa Medium B Galvanis DN 200 ( 8" ) btg
Pipa Medium B Galvanis DN 250 ( 10") btg

VIII B A H A N L A N G I T - L A N G I T
1 AKUSTIK-uk : 30 X 30 lbr
30 X 60 lbr
60 X 120 lbr
List Kayu Profil m' 6,600
2 SOFT BOARD-uk: 4'X 8' (1,2 x2,4 m2)
Gypsum tebal 9 mm lbr 60,000
Gypsum tebal 12 mm lbr
List Gypsum m'
Gypsum tebal 9 mm (120 x 240) lbr
lbr
lbr
lbr
lbr
Sekrup Gypsum bh
Compound zak
GRC Board lbr
Dinabolt Bh
Cotton Plaster bh
List Gypsum m'
Tepung Gypsum kg

Lisplank GRC 20 cm m1 16,250


Lisplank GRC 30 cm m2 22,500

3 HARD BOARD-uk: 4'X 8' (particle board) lbr

4 PLY WOOD

CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)

Teak wood
90 X 210 X 3 mm lbr
. 120 X 240 X 3 mm lbr 80,000
. 90 X 210 X 4 mm lbr 52,800
. 90 X 210 X 9 mm lbr
. 90 X 210 X 12 mm lbr
. 90 X 210 X 15 mm lbr
. 90 X 210 X 18 mm lbr
Tripleks
. 120 X 240 X 3 mm lbr 52,800
. 120 X 240 X 4 mm lbr 62,800
. 120 X 240 X 6 mm lbr
Multipleks
. 120 X 240 X 9 mm lbr 109,000
. 120 X 240 X 12 mm lbr 138,800
. 120 X 240 X 15 mm lbr
. 120 X 240 X 18 mm lbr
Formika ukuran pintu lbr 75,000

Harflex (1,2 x 2,4 m2 tb 5 mm) lbr


(1 x 1 m2 tb 5 mm) lbr
(0,9 x 1,8 m2 tb 5 mm) lbr
Eternit m2 17,300
GRC (1,2 x 2,4 m2 tb 4 mm) lbr
Plywood tebal 4 mm uk.90x220cm lbr 52,800
Plywood tebal 4 mm uk.120x240cm lbr 80,000
IX B A H A N F I N I S H I N G
1 KAYU
Menie kg 28,900
Dempul plamur kg 13,200
Ambril/amplas lbr 5,700
Batu Apung kg -
Cat dasar kg 62,800
. Emco kg -
. Yunior 66 (nippon paint) kg -
- Koas bh 7,400
. Deculux kg -
. Siralax ons -
. Spiritus ltr -
. Plitur jadi ltr 42,100
. Vernis ltr 42,100

2 TEMBOK
Kalkarium kg
Kapur sirih kg
Plamur kg 13,200

CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)

Cat Tembok ex. Nippon Weatherbond kg


Sintex 5 kg
Danabride 5 kg
Catylac 5 kg
Mowilex 5 kg
Alkali Tembok ex. Nippon 3-in 1 Anti-Alkali Primer Sealer kg
MOWILEX PRECOAT VARNISH BATU ALAM lt
Mowilex Clear Coating lt
Cat tembok kg 16,000

3 BESI
Menie kg 27,250
Cat mengkilat kg
Cat kg 50,000
Thinner A ltr
Minyak cat ltr 14,000
Thinner Super ltr
Residu (teer/aspal) drum 296,000
Fibre glass (tanki air)
kapasitas 550 liter. bh
kapasitas 1100 liter. bh
Lem Aica Aibon kg 15,700

X BAHAN KACA
1 POLOS 3 mm m2 57,000
5 mm m2 78,000
8 mm m2
12 mm m2

2 ES KABUR 3 mm m2
5 mm m2

3 RAY BAND 3 mm m2
5 mm m2 89,000
8 mm m2
12 mm m2

4 TEMPERED 12 mm m2

XI BAHAN INSTALASI LISTRIK


1 KABEL LISTRIK
NYA : . 1 X 1 1/2 mm2 m'
SPLN LMK 1 X 2 1/2 mm2 m'
1X4 mm2 m'
1X6 mm2 m'

CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)

NYY :. 2 X 1 1/2 mm2 m'


PRIMA 2 X 2 1/2 mm2 m'
2X4 mm2 m'
2X6 mm2 m'
3 X 1 1/2 mm2 m'
3 X 2 1/2 mm2 m'
3X4 mm2 m'
3X6 mm2 m'
NYM :. 2 X 1 1/2 mm2 m'
PRIMA 2 X 2 1/2 mm2 m'
2X4 mm2 m'
3 X 1 1/2 mm2 m'
3 X 2 1/2 mm2 m'
3X4 mm2 m'
3X6 mm2 m'

2 SKAKELAR
Out bauw . Seri bh
Engkel bh
In bauw . Seri bh
Engkel bh

3 FUSE BOX (SEKERING KASA)


1 group bh
2 group bh
3 group bh

4 STEKER - Biasa bh
Arde bh
T Biasa bh
T dengan Arde bh

5 FITING Flaon bh
Gantung bh
Kap bh
Kombinasi bh

6 STOP KONTAK - Arde Outbow putih bh


Arde Outbow hitam bh
Arde IB bh
Arde Putar bh

XII ALAT - ALAT PENGUNCI & PENGGANTUNG


1 KUNCI TANAM Union : 1 X slag bh
2 X slag bh
Yale : 1 X slag bh 49,500

CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)

2 X slag bh 131,400
Kuda : 1 X slag bh -
2 X slag bh 49,500
2 KUNCI SLOOD -
Sekelas Kuda Terbang bh 49,500
Sekelas Anchor bh 156,100
Kunci Lemari bh 5,000
2 ENGSEL DAN GERENDEL
Engsel Angin bh
Kupu-kupu biasa bh 8,200
Nylon kupu-kupu bh -
Espagnoled - dalam negeri bh -
Grendel Tanam luar negeri bh -
Grendel biasa bh 3,300
Kait Angin bh 2,400
Door Stop bh

XIIIBAHAN SANITAIR
1 KLOSET DUDUK bh 961,900
2 KLOSET JONGKOK bh 125,600
3 WASTAFEL PEDESTAL bh -
4 WASTAFEL MEJA OVAL bh -
5 WASTAFEL GANTUNG BULAT bh 261,900
6 WASTAFEL GANTUNG SUDUT bh -
7 WASTAFEL GANTUNG SUDUT KECIL bh -
8 WASTAFEL BAK CUCI bh -
9 TEMPAT SABUN GANTUNG bh -
10 TEMPAT SABUN TANAM bh -
URINOIR KERAMIK STANDART bh 1,151,200
BAK MANDI FIBRE GLASS 70.70.80 bh 261,900
11 SEPTIC TANK (ETERNIT GRESIK) -
5 Pemakai 500 liter unit -
10 Pemakai 1.000 liter unit -
12 LAIN - LAIN -
Kran Air 1/2" bh -
Kran Air 3/4" bh 19,800
Seal tape bh 3,300
Floor drain bh 3,300
Roof drain kuningan
Bak Cuci Piring bh 230,500
Water drain bh 50,000

XIV ALAT PENGIKAT KAYU


1 PAKU - ukuran 1" s/d 4" kg 14,000
2 PAKU - payung kg
3 PAKU - sekrup kg 18,100

CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)

4PAKU - beton kg
5MUR BAUT (kuda-kuda) kg
6ANGKUR BAUT bh
7LEM KAYU bh 15,700
8Tali Ijuk kg 2,000
Paku Pancing 60 x 230 kg 15,500
XV POMPA AIR
1 POMPA AIR TANGAN
Dragon buatan Indonesia bh
2 POMPA AIR LISTRIK
Sanyo 100 watt bh
Fuji 250 watt bh
Shimizu . 100 watt bh
. 90 watt bh
Dab . 125 watt bh
. 175 watt bh

XVI PAVING BLOCK


1 SQUARE Abu-abu m2
Merah/hitam m2
2 HOLLAND Abu-abu m2
Merah/hitam m2
3 UNIDECOR Abu-abu m2
Merah/hitam m2
4 UNI Abu-abu m2
Merah/hitam m2
5 TRIHEX Abu-abu m2
Merah/hitam m2
6 OLYMPIA HEXA Abu-abu m2
7 HEXAGONAL Abu-abu m2
Merah/hitam m2
8 CASTLE Abu-abu m2
9 TRAPEZ Abu-abu m2
10 TRAPEZ GRASS BLOCK
Abu-abu m2
11 STANDARD GRASS BLOCK ABU-ABU BH
12 BATACO BH 2,400
13 KANSTEEN m' -
14 Paving block natural 6 cm ( K- 175 ) m2 37,100
15 Paving block natural 8 cm ( K-175 ) m2 49,500
16 Paving block warna 6 cm ( K- 175 ) m2 -
17 Paving block warna 8 cm ( K-175 ) m2 -
Paving abu-abu tebal 6 cm m2 37,100
Paving abu-abu tebal 8 cm m2 49,500
Paving abu-abu K.250 tebal 6 cm m2 60,000
Paving abu-abu K.250 tebal 8 cm m2 80,000

CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)

Paving abu-abu K.300 tebal 6 cm m2 65,000


Paving abu-abu K.300 tebal 8 cm m2 86,000

MASTER BETON BOYOLALI (Pricelist 01 Oktober 2014)


1 Paving Block Holland 6 cm K-200-250 Natural bh
2 Paving Block Holland 6 cm K-250-300 Natural bh
3 Paving Block Holland 6 cm K-350-400 Natural bh
4 Paving Block Holland 8 cm K-250-300 Natural bh
5 Paving Block Holland 8 cm K-350-400 Natural bh
6 Paving Block Holland 10 cm K-450-500 Natural bh
7 Paving Block Kubus 6 cm K-250-300 Natural bh
8 Paving Block Kubus 8 cm K-250-300 Natural bh
9 Paving Block Kubus 8 cm K-350-400 Natural bh
10 Paving Block Segi Enam 6 cm K-200-250 Natural bh
11 Paving Block Segi Enam 6 cm K-250-300 Natural bh
12 Paving Block Segi Enam 6 cm K-350-400 Natural bh
13 Topi Uskup Besar 6 cm Natural bh
14 Grass Block Kotak 8cm Natural bh
15 Paving Block Holland 6 cm K-200-250 Warna bh
16 Paving Block Holland 6 cm K-250-300 Warna bh
17 Paving Block Holland 6 cm K-350-400 Warna bh
18 Paving Block Holland 8 cm K-250-300 Warna bh
19 Paving Block Holland 8 cm K-350-400 Warna bh
20 Paving Block Holland 10 cm K-450-500 Warna bh
21 Paving Block Kubus 6 cm K-250-300 Warna bh
22 Paving Block Kubus 8 cm K-250-300 Warna bh
23 Paving Block Kubus 8 cm K-350-400 Warna bh
24 Paving Block Segi Enam 6 cm K-200-250 Warna bh
25 Paving Block Segi Enam 6 cm K-250-300 Warna bh
26 Paving Block Segi Enam 6 cm K-350-400 Warna bh
27 Topi Uskup Besar 6 cm Warna bh
28 Grass Block Kotak 8cm Warna bh
29 Kansteen bh

ALDAS MUNTILAN (Pricelist 15 Februari 2014)


1 Paving Block Holland uk. 10,5 x 21 tb. 6 cm K-300 Natural bh
2 Paving Block Holland uk. 10,5 x 21 tb. 8 cm K-300 Natural bh
3 Paving Block Holland uk. 10,5 x 21 tb. 6 cm K-250 Natural bh
4 Paving Block Unipave uk. 11 x 22 tb. 8 cm K-300 Natural bh
5 Topi Uskup Kecil tb. 6 cm Natural bh
6 Topi Uskup Kecil tb. 8 cm Natural bh
4 Kanstin Standard uk. 10/12,5 x 30 x 50 K-300 bh
5 Kanstin Lubang uk. 10/12,5 x 30 x 50 K-300 bh
6 Kanstin Standard uk. 15/20 x 30 x 50 K-300 bh
7 Kanstin Lubang uk. 15/20 x 30 x 50 K-300 bh
8 Kanstin Standard uk. 18/21 x 30 x 50 K-300 bh

CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)

9 Kanstin Lubang uk. 18/21 x 30 x 50 K-300 bh


10 Grassblock Lubang Kotak uk. 10 x 40 x 40 bh
11 Grassblock Lubang Bulat uk. 10 x 48 x 48 bh

XVII LAIN -LAIN


1 KREI 25 MM m2
2 Sliding Pintu J4 bh
3 Naco rayban 5 mm per Daun bh 82,000
Naco bening 5 mm per Daun bh 91,000
4 Rolling door Besi m2 285,000
Rolling door Almunium m2 443,000
5 Awning Almunium m2
6 Kusen Almunium 4" Putih m' 73,500
7 Kusen Almunium 4" Coklat m' 78,500
7 WIDE FLANGE BEAM
150 X 75 X 5 X 7 X 12 btg
Besi Holo rangka gypsum m1 6,250
8 ASPAL.
Aspal Ex Pertamina isi Net 160 kg drum

Hotmix Tebal = 4 Cm m2
Hotmix Tebal = 5 Cm m2
Hotmix Tebal = 6 Cm m2
Hotmix Tebal = 7 Cm m2
Binder Course ton
Wearing Course ton
Hot Roller Sheet ton
Sand Sheet ton
Sand Sheet Emulsi ton
Cold Mix ton
Prime / Tack Coard RC liter
Prime Coat MC liter
Prime / Tack Coat Emulsi liter
10 K A C A
Cermin tebal 5 mm m2

11 PAGAR BRC. Pagar BRC 90 A2 /lb


Pagar BRC 120 A2 /lb
12 LAIN-LAIN
Minyak Beton & bekisting ltr 14,000
Pintu Lipat Besi 0.8 mm m2 545,400
Sunscreen Allumunim m2 -
Allumunium Foil m2 -
Soda api kg 27,200
Sabun kg

CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)

Air m3 72,500
Koas Alang-alang ikat
Solar (Industri) ltr 6,400
Premium (Industri) ltr 6,700
Pelumas ltr 15,700
Vynil 30 x 30 cm bh

13 WATER PROOFING 5 kg
5 kg
20 Ltr

XVIII BAHAN ALUMUNIUM


1 Alumunium Profil Warna Silver 4" tebal 1.2 mm m' 73,500
Warna Coklat 4" tebal 1.2 mm m' 78,500
Alumunium Coating White 4" tbl 1.2 mm m'

2 Aksesoris Engsel 4" bh


Engsel 3" bh
Cesement 16" set
Kait Angin bh
Rambuncis bh
Sealant tube
Skrup Fixer bh
Profil Kaca m'
Handle Pintu + Kunci set
Spagnolet Tanam bh
Door Closer set
Spandek PVC m2
Sindik Pintu bh
Floor Hinge Ex. Dekson set
Patch Fitting bh
Pull Handle set

CK Boyolali
HARGA HARGA HARGA INDEX
HARGA INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp) (Rp) (Rp)

0.00
0.00 229,000.00
190,000.00 157,020.00 239,000.00 159,000
190,000.00 157,020.00 260,000.00 142,000
200,000.00 165,280.00 135,000.00
200,000.00 163,880.00 200,000.00 240,000
94,210.00 110,000.00 114,000
69,580.00 0.00 102,000
83,960.00 240,000.00 123,000
177,560.00 230,000.00 260,000
170,240.00 215,000.00 250,000
0.00 0.00
0.00 0.00
530.00 760 700
0.00 3400
0.00 3920
0.00 3700
0.00 3700
0.00
86,770.00 125000 102,000
185,000.00 152,890.00 210000 159,000
152,890.00 224000 159,000
35,120.00 72000 52,000
0.00 0
0.00 112000
163,630.00 275000 240,000
0.00 0
0.00
51,230.00 63200 62,000
51,230.00 0 62,000
0.00 0
0.00 0
0.00 0
1,100.00 1580 1,625
0.00 112000
0.00 140000
1,450.00 13500 13,500
0.00

CK Boyolali
HARGA HARGA HARGA INDEX
HARGA INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp) (Rp) (Rp)
0.00
0.00 728000
0.00 42790
0.00
0.00
0.00 0
0.00 0
0.00 0
4,040.00 0 6,000
0.00 0
0.00 0
0.00 6280
0.00 6720
1,980.00 3,000
0.00
0.00
330.00 0 400
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
1,900.00 0 3,000
4,000.00 6,000
4,700.00 7,000
4,700.00 7,000
1250
2250
3600
2580
10640
9860
4480
7280
25200
1,500.00 2,200
1,400.00 2,100
1,100.00 1,800
1,100.00 1,700
0.00
0.00
0.00 0
0.00 0
0.00 0
0.00 0
0.00

CK Boyolali
HARGA HARGA HARGA INDEX
HARGA INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp) (Rp) (Rp)
0.00
0.00 79300
0.00 0
0.00 105800
0.00 0
0.00 0
0.00 0
0.00 0
33,050.00 0
38,010.00 53800
42,970.00 0
49,580.00 72800
56,190.00 0
62,800.00 0
53,710.00
47,680.00
0.00
0.00 0
0.00 0
0.00 0
0.00
25,950.00 0 38,000
0.00 0
0.00 0
0.00
0.00
14,290.00 0 21,000 17,300
0.00 0 -
0.00 0 -
0.00 0 -
0.00 -
0.00 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 -
0.00 0 -
0.00 25200 -
0.00 35300 -
0.00 53800 -
27,270.00 0 40,000 33,000
0.00 0 -
0.00 -

CK Boyolali
HARGA HARGA HARGA INDEX
HARGA INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp) (Rp) (Rp)
0.00 -
19,750.00 29,000 23,900
28,670.00 42,000 34,700
0.00 -
0.00 0 -
39,580.00 0 58,000 47,900
49,170.00 42600 72,000 59,500
65,530.00 58300 96,000 79,300
0.00 0 -
41,650.00 -
0.00 -
0.00 50000 -
0.00 75000 -
0.00 800 -
0.00 20000 -
0.00 -
0.00 -
0.00 26280000 -
0.00 23968000 -
0.00 21400000 -
11,187,680.00 16,380,000 13,537,100
9,466,520.00 13,860,000 11,454,500
12,048,340.00 17,640,000 14,578,500
10,327,100.00 15,120,000 12,495,800
0.00 -
6,249,500.00 9800000 9,150,000 7,561,900
6,048,010.00 9072000 8,855,000 7,318,100
0.00 -
4,793,380.00 6498000 7,337,000 6,063,600
4,628,090.00 5936000 9,244,000 7,639,600
0.00 -
3,801,650.00 5600000 6,325,000 5,227,200
3,388,420.00 5152000 5,693,000 4,704,900
0.00 3304000 -
0.00 -
0.00 3696000 -
1,652,890.00 3136000 2,530,000 2,090,900
0.00 -
8,512,390.00 12880000 11,845,000 9,789,200
7,685,950.00 11760000 10,925,000 9,028,900
0.00 -
2,479,330.00 3696000 3,795,000 3,136,300
2,066,110.00 3136000 3,163,000 2,614,000
0.00 -
14,870.00 20000 20,000 18,000
0.00 16000 -

CK Boyolali
HARGA HARGA HARGA INDEX
HARGA INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp) (Rp) (Rp)
0.00 25000 -
0.00 0 -
0.00 812000 -
10,900.00 14200 16,000 13,200
0.00 33750 -
0.00 9700 -
0.00 26900 -
16,520.00 -

0.00 -
0.00 -
0.00 40320 -
0.00 31360 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 -
0.00 0 -
0.00 0 -
0.00 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 -
0.00 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 -
34,130.00 50400 50,000 41,300
34,790.00 0 51,000 42,100
0.00 0 -

CK Boyolali
HARGA HARGA HARGA INDEX
HARGA INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp) (Rp) (Rp)
0.00 0 -
0.00 0 -
31,400.00 46,000 38,000
34,790.00 51,000 42,100
43,630.00 64,000 52,800
36,850.00 54,000 44,600
36,850.00 54,000 44,600
3,300.00
2,470.00
90,900.00
132,230.00 0 -
28,920.00 -
81,900.00 0 -
123,960.00 -

0.00 0 -
0.00 -
129,750.00 0 190,000 157,000
0.00 0 -
80,990.00 107520 107,520 97,745
0.00 -
0.00 60480 -
0.00 50400 -
0.00 58240 -
0.00 68320 -
0.00 90720 -
0.00 78400 -
0.00 98560 -
0.00 49280 -
0.00 57120 -
0.00 62720 -
0.00 72800 -
0.00 107520 -
0.00 85120 -
0.00 924000 -
0.00 284480 -
0.00 470400 -
0.00 154560 -
81,900.00 143360 120,000 99,100
0.00 201600 -
0.00 61600 -
0.00 154560 -
0.00 -
0.00 175000 -
0.00 15000 -
0.00 23000 -

CK Boyolali
HARGA HARGA HARGA INDEX
HARGA INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp) (Rp) (Rp)
0.00 -
0.00 -
0.00 -
0.00 0 -
22,520.00 39200 33,000 27,200
34,790.00 56000 51,000 42,100
42,970.00 67200 63,000 52,000
64,170.00 75100 94,000 77,600
95,610.00 0 140,000 115,700
0.00 0 -
0.00 100800 -
189,830.00 134100 278,000 229,700
64,870.00 95,000 78,500
71,650.00 105,000 86,700
94,870.00 139,000 114,800
0.00 0 -
0.00 0 -
30,700.00 37000 45,000 37,100
38,920.00 42600 57,000 47,100
0.00 0 -
0.00 -
0.00 -
4,950.00 0 6,000 4,900
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 -
0.00 -
8,260.00 10650 11,000 9,000
0.00 0 -
8,260.00 10650 11,000 9,000
0.00 -
3,380.00 10650 5,000 4,100
0.00 -
9,500.00 12900 14,000 11,500
12,230.00 18,000 14,800
0.00 -
0.00 0 -
0.00 0 -
0.00 616000 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -

CK Boyolali
HARGA HARGA HARGA INDEX
HARGA INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp) (Rp) (Rp)
9,540.00 13900 14,000 11,500
0.00 -
12,970.00 16800 19,000 15,700
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 17250 -
0.00 16000 -
21,480.00 32,000 26,400
0.00 -
0.00 -
19,090.00 23600 28,000 23,100
14,950.00 650 22,000 18,100
0.00 1750 -
0.00 1600 -
0.00 12600 -
0.00 21300 -
0.00 28000 -
0.00 75000 -
610.00 -

0.00 -
0.00 -
0.00 -
12,230.00 0 18,000 14,800
17,020.00 0 25,000 20,600
23,880.00 0 35,000 28,900
20,410.00 0 30,000 24,700
40,240.00 0 59,000 48,700
0.00 0 -
126,280.00 0 185,000 152,800
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
126,280.00 185,000 152,800
40,240.00 59,000 48,700

CK Boyolali
HARGA HARGA HARGA INDEX
HARGA INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp) (Rp) (Rp)
20,410.00 30,000 24,700
23,880.00 35,000 28,900
17,020.00 25,000 20,600
12,230.00 18,000 14,800
0.00 -
0.00 -
73,710.00 0 108,000 89,200
90,080.00 0 132,000 109,000
135,200.00 0 198,000 163,600
237,680.00 0 348,000 287,600
299,090.00 0 438,000 361,900
0.00 0 -
467,100.00 0 684,000 565,200
458,920.00 0 672,000 555,300
1,040,900.00 0 1,524,000 1,259,500
0.00 0 -
0.00 0 -
0.00 -
0.00 -
0.00 0 -
0.00 0 -
0.00 0 -
5,450.00 9700 8,000 6,600
0.00 -
49,580.00 67968 76,000 62,800
0.00 84096 -
0.00 9000 -
0.00 80000 -
0.00 75000 -
0.00 75000 -
0.00 65000 -
0.00 65000 -
0.00 12.57142857 -
0.00 75000 -
0.00 68000 -
0.00 7200 -
0.00 15000 -
0.00 8500 -
0.00 12500 -
0.00 -
13,420.00 -
18,590.00
0.00 -
0.00 0 -
0.00 -
0.00 -

CK Boyolali
HARGA HARGA HARGA INDEX
HARGA INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp) (Rp) (Rp)
0.00 -
0.00 0 -
66,110.00 0 -
43,630.00 0 64,000 52,800
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 -
43,630.00 50400 64,000 52,800
51,900.00 67200 76,000 62,800
0.00 84000 -
0.00 -
90,080.00 128800 132,000 109,000
114,710.00 168000 168,000 138,800
0.00 0 -
0.00 0 -
61,980.00 0 -
0.00 -
0.00 85200 -
0.00 34800 -
0.00 46000 -
14,290.00 15700 21,000 17,300
0.00 66100 -
43,630.00 -

0.00 -
0.00 -
1.98 23,880.00 33600 35,000 28,900
2.88 10,900.00 23600 16,000 13,200
0.6875 4,710.00 9600 7,000 5,700
36,300 0.00 22400 -
51,900.00 0 76,000 62,800
0.00 0 -
0.00 0 -
6,110.00 0 9,000 7,400
0.00 58300 -
0.00 39200 -
0.00 18000 -
34,790.00 0 51,000 42,100
34,790.00 0 51,000 42,100
0.00 -
0.00 -
0.00 0 -
0.00 0 -
10,900.00 23600 16,000 13,200

CK Boyolali
HARGA HARGA HARGA INDEX
HARGA INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp) (Rp) (Rp)
0.00 80640 -
0.00 0 -
0.00 0 -
0.00 112500 -
0.00 0 -
0.00 67200 -
0.00 67200 -
0.00 64960 -
13,220.00 21,000 17,300
0.00 -
0.00 -
22,520.00 33600 35,000 28,900
0.00 58300 -
41,320.00 0 76,000 62,800
0.00 23600 -
11,570.00 25200 17,000 14,000
0.00 0 -
244,620.00 0 360,000 297,500
0.00 -
0.00 0 -
0.00 0 -
12,970.00 0 19,000 15,700
0.00 -
0.00 -
47,100.00 0 70,000 57,800
64,460.00 60500 95,000 78,500
0.00 69500 -
0.00 106400 -
0.00 -
0.00 0 -
0.00 79600 -
0.00 -
0.00 0 -
73,550.00 68900 82,000 67,700
0.00 74500 -
0.00 117600 -
0.00 -
0.00 1200000 -
0.00 -
0.00 -
0.00 -
0.00 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -

CK Boyolali
HARGA HARGA HARGA INDEX
HARGA INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp) (Rp) (Rp)
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 -
0.00 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 -
0.00 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 -
0.00 -
0.00 0 -
0.00 0 -
40,900.00 0 60,000 49,500

CK Boyolali
HARGA HARGA HARGA INDEX
HARGA INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp) (Rp) (Rp)
108,590.00 0 159,000 131,400
0.00 0 -
40,900.00 67200 60,000 49,500
0.00 -
40,900.00 60,000 49,500
129,000.00 189,000 156,100
4,130.00 -
0.00 -
0.00 0 -
6,770.00 0 10,000 8,200
0.00 0 -
0.00 0 -
0.00 0 -
2,720.00 0 4,000 3,300
1,980.00 0 3,000 2,400
0.00 0 -
0.00 -
0.00 -
794,950.00 2184000 1,164,000 961,900
103,800.00 129000 152,000 125,600
0.00 0 -
0.00 0 -
216,440.00 0 317,000 261,900
0.00 278000 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
951,400.00 1,393,000 1,151,200
216,440.00 317,000 261,900
0.00 -
0.00 0 -
0.00 0 -
0.00 -
0.00 17000 -
16,360.00 29500 24,000 19,800
2,720.00 3400 4,000 3,300
2,720.00 56000 4,000 3,300
0.00 79000 -
190,490.00

0.00 -
0.00 -
11,570.00 14600 17,000 14,000
0.00 0 -
14,950.00 0 22,000 18,100

CK Boyolali
HARGA HARGA HARGA INDEX
HARGA INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp) (Rp) (Rp)
0.00 0 -
0.00 0 -
0.00 0 -
12,970.00 0 19,000 15,700
1,650.00 2500 2,500 2,000
12,800.00 -
0.00 -
0.00 -
0.00 0 -
0.00 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 -
0.00 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 -
0.00 0 -
0.00 0 -
1,980.00 0 3,000 2,400
0.00 0 -
30,660.00 58240 45,000 37,100
40,900.00 91840 60,000 49,500
0.00 69440 -
0.00 103040 -
30,660.00 45,000 37,100
40,900.00 60,000 49,500
49,580.00 68,000 56,100
66,110.00 80,000 66,100

CK Boyolali
HARGA HARGA HARGA INDEX
HARGA INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp) (Rp) (Rp)
53,710.00 77,000 63,600
71,070.00 90,000 74,300
0.00 -
0.00 -
0.00 1270 -
0.00 1460 -
0.00 1580 -
0.00 2180 -
0.00 2450 -
0.00 3320 -
0.00 2810 -
0.00 3840 -
0.00 4310 -
0.00 2170 -
0.00 2510 -
0.00 2720 -
0.00 3280 -
0.00 7310 -
0.00 1510 -
0.00 1730 -
0.00 1880 -
0.00 2450 -
0.00 2710 -
0.00 3640 -
0.00 3320 -
0.00 4310 -
0.00 4770 -
0.00 2590 -
0.00 2970 -
0.00 3220 -
0.00 4330 -
0.00 8340 -
0.00 26910 -
0.00 -
0.00 -
0.00 1860 -
0.00 2570 -
0.00 1690 -
0.00 2890 -
0.00 1250 -
0.00 2460 -
0.00 30360 -
0.00 36960 -
0.00 47520 -
0.00 52800 -
0.00 58080 -

CK Boyolali
HARGA HARGA HARGA INDEX
HARGA INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp) (Rp) (Rp)
0.00 55440 -
0.00 16050 -
0.00 23120 -
0.00 -
0.00 -
0.00 -
0.00 0 -
0.00 0 -
67,760.00 0 82,000 67,700
75,200.00 0 91,000 75,200
235,530.00 0 285,000 235,500
366,110.00 0 443,000 366,100
0.00 0 -
60,740.00 0 72,000 59,500
64,870.00 0 78,000 64,400
0.00 -
0.00 0 -
5,160.00 -
0.00 -
0.00 0 -
0.00 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 -
0.00 0 -
0.00 -
0.00 0 -
0.00 0 -
0.00 -
11,570.00 6000 17,000 14,000
450,740.00 0 660,000 545,400
0.00 0 -
0.00 8580 -
22,470.00 0 33,000 27,200
0.00 0 -

CK Boyolali
HARGA HARGA HARGA INDEX
HARGA INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp) (Rp) (Rp)
59,910.00 80000 80,000 66,100
0.00 0 -
5,280.00 0 6,400 5,200
5,530.00 0 6,700 5,500
12,970.00 0 19,000 15,700
0.00 0 -
0.00 -
0.00 78500 -
0.00 71000 -
0.00 525000 -
0.00 -
0.00 -
60,740.00 85000 72,000 59,500
64,870.00 108000 78,000 64,400
0.00 102000 -
0.00 -
0.00 28000 -
0.00 25500 -
0.00 75000 -
0.00 30000 -
0.00 35000 -
0.00 35000 -
0.00 600 -
0.00 6000 -
0.00 250000 -
0.00 25000 -
0.00 455000 -
0.00 55000 -
0.00 15000 -
0.00 1490000 -
0.00 637000 -
0.00 260000 -
0.00 -
-

CK Boyolali
HARGA SURVEI I HARGA SURVEI II INTERNET (Rp)
(Rp) (Rp)

REAL PLUS PPN

530.00

CK Boyolali
HARGA SURVEI I HARGA SURVEI II INTERNET (Rp)
(Rp) (Rp)

40000 44000
46000 50600
52000 57200
60000 66000
68000 74800
132000 110000 76000 83600

CK Boyolali
HARGA SURVEI I HARGA SURVEI II INTERNET (Rp)
(Rp) (Rp)

6,000,000.00
6,000,000.00

9,500,000.00
9,500,000.00

CK Boyolali
HARGA SURVEI I HARGA SURVEI II INTERNET (Rp)
(Rp) (Rp)

42,000.00 40,000.00
49,000.00 48,000.00

CK Boyolali
HARGA SURVEI I HARGA SURVEI II INTERNET (Rp)
(Rp) (Rp)

55000
45,000.00 43000
47,000.00 45000
49,000.00 48000
49,000.00 49000

CK Boyolali
HARGA SURVEI I HARGA SURVEI II INTERNET (Rp)
(Rp) (Rp)

50,000.00
60,000.00
65,000.00
75,000.00
85,000.00

90,000.00
100,000.00

27,500.00
35,000.00

9,500.00

9,500.00

CK Boyolali
HARGA SURVEI I HARGA SURVEI II INTERNET (Rp)
(Rp) (Rp)

14,000.00

20,000.00 15,000.00
35000

160000

CK Boyolali
HARGA SURVEI I HARGA SURVEI II INTERNET (Rp)
(Rp) (Rp)

29000
22000
20000
18000

59,000.00

CK Boyolali
HARGA SURVEI I HARGA SURVEI II INTERNET (Rp)
(Rp) (Rp)

50,000.00
60,000.00

100,000.00
140,000.00

15,000.00

26,000.00
29,000.00 28,000.00

45,000.00 50,000.00

CK Boyolali
HARGA SURVEI I HARGA SURVEI II INTERNET (Rp)
(Rp) (Rp)

19,000.00 18,000.00

29,000.00

10000 20000

55,000.00
65,000.00

75,000.00

CK Boyolali
HARGA SURVEI I HARGA SURVEI II INTERNET (Rp)
(Rp) (Rp)

65,000.00

10,000.00 10,000.00

5000
5,000.00

600,000.00 650,000.00
145,000.00 140,000.00

350,000.00

15,000.00 15,000.00

12,000.00

CK Boyolali
HARGA SURVEI I HARGA SURVEI II INTERNET (Rp)
(Rp) (Rp)

13000 13000

24

CK Boyolali
DAFTAR HARGA SATUAN BAHAN BANGUNAN

PEKERJAAN : -
LOKASI : -
TAHUN ANGGARAN : -

HARGA
NO. J E N I S B A H A N SATUAN (Rp)

I BAHAN DASAR
1 BATU KALI Bulat Utuh m3
Bulat Belah m3 230,000
Pecah 10/15 m3 230,000
Pecah 5/7 m3 242,000
Pecah 3/5 m3 242,000
2 KERIKIL Timbunan Pilihan m3 114,000
Sawur / Koral m3 102,000
Beton 0,5/1 m3 123,000
Beton 1/2 m3 260,000
Beton 2/3 m3 250,000
Biasa m3
Tras Giling m3
3 BATU BATA ex lokal bh 700
Concrete Blok (CB 15) / Batako (Lubang2) bh
Batako Padat bh
Rosteer beton cetak 12 x 11 x 24 cm bh
Rosteer tanah liat bakar 12 x 11 x 24 cm bh

4 PASIR Urug m3 102,000


Pasang m3 159,000
Beton m3 159,000
5 TANAH Padas m3 52,000
Liat m3
Subur m3
6 KAPUR Pasang m3 240,000
Semen Merah m3
7 PORTLAND CEMENT
Gresik 40 kg zak 62,000
Holcim 40 kg zak 62,000
Holcim 50 kg zak
Cibinong 40 kg zak
Cibinong 50 kg zak
Portland Cement kg 1,625
Semen Putih 40 kg zak
Semen Putih 50 kg zak
Semen warna kg 13,500

CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)

II B A H A N P E N U T U P A T A P
1 SIRAP (100 lbr) pak
Sirap asbes semen m2

2 GENTENG BETON
Genteng Beton Warna standard bh
Genteng Beton Warna Special bh
Genteng Beton Warna Khusus bh
Kerpus Beton Warna Standard bh 6,000
Kerpus Beton Warna Special bh
Kerpus Beton Warna Khusus bh
Genteng beton ex. Mutiara bh
Genteng beton flat ex. Mutiara bh
Genteng press beton polos tipe nusantara 3,000

3 GENTENG TANAH LIAT


Vlaam bh 400
Kodok bh
Kodok Glasur bh
Nok kerpus Kodok bh
Nok kerpus Kodok Glasur bh
Plentong super besar 18 bh/m2 bh
Nok kerpus plentong super bh 3,000
Kerpus press beton 6,000
Kerpus press mantili 7,000
Kerpus press tipe soka kebumen 7,000
Genteng lokal tipe plenthong
Genteng kebumen tipe plentong kecil
Genteng kebumen tipe morando
Genteng kebumen tipe kodok
Genteng keramik ex. Kanmuri
Genteng keramik ex. KIA KW I
Genteng kerpus lokal
Genteng kerpus kebumen
Genteng kerpus keramik
Genteng soka kebumen plentong besar 2,200
Genteng soka kebumen plentong kecil 2,100
Genteng press mantili besar 1,800
Genteng press mantili kecil 1,700

4 GENTENG KACA
Vlaam tebal 2 mm bh
Vlaam tebal 3 mm bh
Kodok tebal 2 mm bh
Kodok tebal 3 mm bh

CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)

5 ASBES GELOMBANG BESAR


. 200 cm X 102 cm X 5 mm bh
. 225 cm X 102 cm X 5 mm bh
. 250 cm X 102 cm X 5 mm bh
. 200 cm X 102 cm X 6 mm bh
. 225 cm X 102 cm X 6 mm bh
. 250 cm X 102 cm X 6 mm bh
Asbes Gelombang Kecil
. 150 cm X 105 cm X 4 mm bh 44,000
. 180 cm X 105 cm X 4 mm bh 50,600
. 210 cm X 105 cm X 4 mm bh 57,200
. 240 cm X 105 cm X 4 mm bh 66,000
. 270 cm X 105 cm X 4 mm bh 74,800
. 300 cm X 105 cm X 4 mm bh 103,000

NOK Jabes nok


. Kerpus Genteng bh
. Stel Besar bh
. Paten Besar bh
Nokstel gelombang harflex
. Stel Besar bh 38,000
. Patent Besar bh
. Plat besar bh

6 ASBES PLAT
. 100cm X 100 cm X 3 mm bh 21,000
. 100cm X 100 cm X 4 mm bh
. 50 cm X 200 cm X 3 mm bh
. 40 cm X 200 cm X 3 mm bh

7 FIBRE GLASS (JABES)


180 X 92 cm bh
200 X 92 cm bh
250 X 92 cm bh
180 X 105 cm bh
210 X 105 cm bh
250 X 105 cm bh
8 SENG PLAT
BJLS 0,18 lebar 55 cm m'
BJLS 0,20 lebar 55 cm m'
BJLS 0,20 lebar 90 cm m'
BJLS 0,20 lebar 120 cm m'
BJLS 0,28 lebar 55 cm lbr 40,000
BJLS 0,30 lebar 55 cm m'
BJLS 0,25 lebar 55 cm m'
BJLS 0,30 lebar 55 cm m'

CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)

BJLS 0,30 lebar 60 cm m' 29,000


BJLS 0,30 lebar 90 cm m' 42,000
9 SENG GELOMBANG
BJLS 0,18 panjang 180 cm lbr
BJLS 0,20 panjang 180 cm lbr 58,000
BJLS 0,30 panjang 180 cm lbr 72,000
BJLS 0,30 panjang 240 cm lbr 96,000
BJLS 0,40 panjang 180 cm lbr

10 ASPAL BITUMEN
Atap Onduvila lbr
Nok Onduvila lbr
Skrup pcs
Lisplank GRC 2/20 m'

III B A H A N K A Y U
1 JATI Papan m3
Balok/pesagen m3
Reng m3
Balok kelas II m3 16,380,000
Balok kelas III m3 13,860,000
Papan kelas II m3 17,640,000
Papan kelas III m3 15,120,000

2 KAMPER Papan m3 9,150,000


Balok/pesagen m3 8,855,000

3 KRUING Papan m3 7,337,000


Balok/pesagen m3 9,244,000

4 MERANTI Papan m3 6,325,000


Balok/pesagen m3 5,693,000
Papan Begesting m3

5 KAYU TAHUN BEKISPapan m3


Balok/pesagen m3 2,530,000

6 BENGKIRAI Papan m3 11,845,000


Balok/pesagen m3 10,925,000

7 SENGON Papan m3 3,795,000


Balok/pesagen m3 3,163,000

8 DOLKEN Sedang 8 - 10 x 400 cm bt 20,000


Kecil 6 - 7 x 400 cm bt
Besar 10 - 12 x 400 cm bt

CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)

Kayu cetakan m3
Kayu bakar m3
Bambu bt 16,000
Kayu list m'
Kayu list profil m'
Anyaman Bambu m2

IV BAHAN PENUTUP DINDING / LANTAI


1 UBIN (TEGEL BIASA)
PC polos 30 X 30 cm m2
20 X 20 cm m2
PC warna 30 X 30 cm m2
20 X 20 cm m2
Teraso 30 X 30 cm m2
2 TEGEL PLINT
PC warna 10 X 20 cm bh
PC abu-abu 15 x 20 bh

3 POLIS UBIN Lantai/badan m'


Plint m'
Trap m'

4 UBIN PORSELIN
Lokal 11 X 11 putih dos
11 X 11 warna dos
Lokal 15 X 15 putih dos
15 X 15 warna dos
5 MOZAIK PORSELIN
10 X 20 cm m2
15 X 15 cm m2
20 X 20 cm m2
20 X 25 cm m2

6 Keramik 30 X 30 cm polos m2 50,000


20 X 20 cm KM/WC m2 51,000
33 x 33 cm m2
25 x 25 cm m2
15 x 20 cm m2
Keramik anti slip 46,000
Keramik warna pola 30/30 m2 51,000
Keramik warna pola 40/40 m2 64,000
Keramik dinding 20/25 m2 54,000
Keramik dinding 20/20 m2 54,000
7 Parquet Jati m2

8 Batu Paras m2

CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)

9 Batu Tempel Hitam m2

10 GRANITO 40 x 40 cm m2 190,000
30 x 30 cm m2
11 Marmer m2 107,520

12 Keramik lantai 20/20 ex. KIA ( textur) m2


Keramik lantai 30/30 KW I ex. Mulia ( Polish ) m2
Keramik lantai 30/30 KW II ex. Mulia ( un polish ) m2
Keramik lantai 40/40 ex. Hercules m2
Keramik lantai 40/40 ex. Roman m2
Keramik lantai 60/60 ex. Hercules m2
Keramik lantai 60/60 ex. Roman m2
Keramik dinding 10/20 ex. KIA m2
Keramik dinding 20/20 ex. KIA m2
Keramik dinding 20/25 ex. KIA m2
Keramik dinding 25/40 ex. KIA m2
Marmer Tulungagung m2
Marmer lampung m2
Marmer Itali m2
Granito 60x60 polished ex. Innesa (lokal) m2
Granito 60x60 polished ex. Esenza (Import) m2
Batu palimanan lempeng potong pabrikasi m2
Batu candi m2 120,000
Batu andesit m2
Batu lempeng acak ( tidak beraturan) m2
Batu lempeng potong pabrikasi m2

13 Homogenous Tile 60/60 Ex. Indogress TPZ


Plint Homogenous Tile 10/60 Ex. Indogress TPZ
Step Nosing 10/30

V.BAHAN CETAK
1 BUIS BETON Ø 10 cm - 100 cm bh
Ø 20 cm - 100 cm bh 33,000
Ø 30 cm - 100 cm bh 51,000
Ø 40 cm - 100 cm bh 63,000
Ø 50 cm - 100 cm bh 94,000
Ø 60 cm - 100 cm bh 140,000
Ø 70 cm - 100 cm bh
Ø 80 cm - 100 cm bh
Ø 100 cm - 100 cm bh 278,000
Ø 80 cm - 50 cm bh 95,000
Ø 90 cm - 50 cm bh 105,000

CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)

Ø 100 cm - 50 cm bh 139,000
U 10 cm - 100 cm bh
U 15 cm - 100 cm bh
U 20 cm - 100 cm bh 45,000
U 30 cm - 100 cm bh 57,000
U 50 cm - 100 cm bh

2 LUBANG ANGIN (ROSTER) PC + PASIR


10 X 20 cm bh 6,000
20 X 20 cm bh
25 X 25 cm bh
30 X 30 cm bh
15 X 25 cm bh
15 X 30 cm bh

VI B A H A N B E S I
1 BESI BETON besi beton polos kg 11,000
besi beton prestress kg
besi beton ulir kg 11,000

2 BESI PLAT Besi Strip kg 5,000

3 BESI PROFIL Besi Profil kg 14,000


Besi Profil WF kg 18,000
4 JARING - JARING BAJA
Diameter 4 - 15 kg
Diameter 6 - 15 kg
M-8 (size 5,4 x 2,1 m2) lbr
Kawat Bronjong kg
5 BESI SIKU L 40 X 40 X 4 btg
L 50 X 50 X 5 btg
L 60 X 60 X 6 btg
L All Size kg 14,000

6 KAWAT - Ikat beton/bendrat kg 19,000


- Harmonika 12 X 45 mm m2
- Harmonika 12 X 24 mm m2
- Harmonika 14 X 30 mm m2
- Harmonika 14 X 35 mm m2
- Kawat Nyamuk Nylon m2
- Kawat Kasa m2
- Saringan pasir m2
- Kawat loket m2
- Kawat duri rol
- Kawat duri kg
- Kawat bronjong kg

CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)

- Kawat las kg 32,000

7 LAIN-LAIN
Paku asbes kg 28,000
Paku sekrup asbes bh 22,000
Paku crampon bh
Dynabolt ukuran 8 mm x 65 mm bh
Baut gording kg
Hollow Galvanis 2.4. 400 bt
Hollow Galvanis 4.4. 400 bt
Baja Ringan C.75 ex. Taso bt

VII B A H A N P I P A
1 Pipa PVC SII SCJ , S - 12,5 (10 bar)
Pipa PVC DN 20 ( ½" ) AW JIS btg 18,000
Pipa PVC DN 25 ( ¾" ) AW JIS btg 25,000
Pipa PVC DN 32 ( 1" ) AW JIS btg 35,000
Pipa PVC DN 40 ( 1½" ) btg 30,000
Pipa PVC DN 63 ( 2" ) btg 59,000
Pipa PVC DN 90 ( 3" ) btg
Pipa PVC DN 110 ( 4" ) btg 185,000
Pipa PVC DN 160 ( 6" ) btg
Pipa PVC DN 200 ( 8" ) btg
Pipa PVC DN 250 ( 10" ) btg
Pipa PVC DN 315 ( 12" ) btg
Pipa PVC Ø 4" (AW - SCJ) 4 m 185,000
Pipa PVC Ø 2" (AW - SCJ) 4 m 59,000
Pipa PVC Ø 1 1/2" (AW - SCJ) 4 m 30,000
Pipa PVC Ø 1" (AW - SCJ) 4 m 35,000
Pipa PVC Ø 3/4" (AW - SCJ) 4 m 25,000
Pipa PVC Ø 1/2" (AW - SCJ) 4 m 18,000

2 Pipa Medium B Galvanis - SII


Pipa Medium B Galvanis DN ½" btg 108,000
Pipa Medium B Galvanis DN 25 ( ¾" ) btg 132,000
Pipa Medium B Galvanis DN 32 ( 1" ) btg 198,000
Pipa Medium B Galvanis DN 50 ( 1½" ) btg 348,000
Pipa Medium B Galvanis DN 63 ( 2" ) btg 438,000
Pipa Medium B Galvanis DN 2½" btg
Pipa Medium B Galvanis DN 90 ( 3" ) btg 684,000
Pipa Medium B Galvanis DN 110 ( 4" ) btg 672,000
Pipa Medium B Galvanis DN 160 ( 6" ) btg 1,524,000
Pipa Medium B Galvanis DN 200 ( 8" ) btg
Pipa Medium B Galvanis DN 250 ( 10") btg

CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)

VIII B A H A N L A N G I T - L A N G I T
1 AKUSTIK-uk : 30 X 30 lbr
30 X 60 lbr
60 X 120 lbr
List Kayu Profil m' 8,000
2 SOFT BOARD-uk: 4'X 8' (1,2 x2,4 m2)
Gypsum tebal 9 mm lbr 76,000
Gypsum tebal 12 mm lbr
List Gypsum m'
Gypsum tebal 9 mm (120 x 240) lbr
lbr
lbr
lbr
lbr
Sekrup Gypsum bh
Compound zak
GRC Board lbr
Dinabolt Bh
Cotton Plaster bh
List Gypsum m'
Tepung Gypsum kg

3 HARD BOARD-uk: 4'X 8' (particle board) lbr

4 PLY WOOD
Teak wood
90 X 210 X 3 mm lbr
. 120 X 240 X 3 mm lbr
. 90 X 210 X 4 mm lbr 64,000
. 90 X 210 X 9 mm lbr
. 90 X 210 X 12 mm lbr
. 90 X 210 X 15 mm lbr
. 90 X 210 X 18 mm lbr
Tripleks
. 120 X 240 X 3 mm lbr 64,000
. 120 X 240 X 4 mm lbr 76,000
. 120 X 240 X 6 mm lbr
Multipleks
. 120 X 240 X 9 mm lbr 132,000
. 120 X 240 X 12 mm lbr 168,000
. 120 X 240 X 15 mm lbr
. 120 X 240 X 18 mm lbr
Formika ukuran pintu lbr

CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)

Harflex (1,2 x 2,4 m2 tb 5 mm) lbr


(1 x 1 m2 tb 5 mm) lbr
(0,9 x 1,8 m2 tb 5 mm) lbr
Eternit m2 21,000
GRC (1,2 x 2,4 m2 tb 4 mm) lbr

IX B A H A N F I N I S H I N G
1 KAYU
Menie kg 35,000
Dempul plamur kg 16,000
Ambril/amplas lbr 7,000
Batu Apung kg
Cat dasar kg 76,000
. Emco kg
. Yunior 66 (nippon paint) kg
- Koas bh 9,000
. Deculux kg
. Siralax ons
. Spiritus ltr
. Plitur jadi ltr 51,000
. Vernis ltr 51,000

2 TEMBOK
Kalkarium kg
Kapur sirih kg
Plamur kg 16,000
Cat Tembok ex. Nippon Weatherbond kg
Sintex 5 kg
Danabride 5 kg
Catylac 5 kg
Mowilex 5 kg
Alkali Tembok ex. Nippon 3-in 1 Anti-Alkali Primer Sealer kg
MOWILEX PRECOAT VARNISH BATU ALAM lt
Mowilex Clear Coating lt
Cat tembok kg 21,000

3 BESI
Menie kg 35,000
Cat mengkilat kg
Cat kg 76,000
Thinner A ltr
Minyak cat ltr 17,000
Thinner Super ltr
Residu (teer/aspal) drum 360,000
Fibre glass (tanki air)
kapasitas 550 liter. bh

CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)

kapasitas 1100 liter. bh


Lem Aica Aibon kg 19,000

X BAHAN KACA
1 POLOS 3 mm m2 70,000
5 mm m2 95,000
8 mm m2
12 mm m2

2 ES KABUR 3 mm m2
5 mm m2

3 RAY BAND 3 mm m2
5 mm m2 82,000
8 mm m2
12 mm m2

4 TEMPERED 12 mm m2

XI BAHAN INSTALASI LISTRIK


1 KABEL LISTRIK
NYA : . 1 X 1 1/2 mm2 m'
SPLN LMK 1 X 2 1/2 mm2 m'
1X4 mm2 m'
1X6 mm2 m'
NYY :. 2 X 1 1/2 mm2 m'
PRIMA 2 X 2 1/2 mm2 m'
2X4 mm2 m'
2X6 mm2 m'
3 X 1 1/2 mm2 m'
3 X 2 1/2 mm2 m'
3X4 mm2 m'
3X6 mm2 m'
NYM :. 2 X 1 1/2 mm2 m'
PRIMA 2 X 2 1/2 mm2 m'
2X4 mm2 m'
3 X 1 1/2 mm2 m'
3 X 2 1/2 mm2 m'
3X4 mm2 m'
3X6 mm2 m'

2 SKAKELAR
Out bauw . Seri bh
Engkel bh
In bauw . Seri bh

CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)

Engkel bh

3 FUSE BOX (SEKERING KASA)


1 group bh
2 group bh
3 group bh

4 STEKER - Biasa bh
Arde bh
T Biasa bh
T dengan Arde bh

5 FITING Flaon bh
Gantung bh
Kap bh
Kombinasi bh

6 STOP KONTAK - Arde Outbow putih bh


Arde Outbow hitam bh
Arde IB bh
Arde Putar bh

XII ALAT - ALAT PENGUNCI & PENGGANTUNG


1 KUNCI TANAM Union : 1 X slag bh
2 X slag bh
Yale : 1 X slag bh 60,000
2 X slag bh 159,000
Kuda : 1 X slag bh
2 X slag bh 60,000
2 KUNCI SLOOD
Sekelas Kuda Terbang bh 60,000
Sekelas Anchor bh 189,000

2 ENGSEL DAN GERENDEL


Engsel Angin bh
Kupu-kupu biasa bh 10,000
Nylon kupu-kupu bh
Espagnoled - dalam negeri bh
Grendel Tanam luar negeri bh
Grendel biasa bh 4,000
Kait Angin bh 3,000
Door Stop bh

XIII BAHAN SANITAIR


1 KLOSET DUDUK bh 1,164,000
2 KLOSET JONGKOK bh 152,000

CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)

3 WASTAFEL PEDESTAL bh
4 WASTAFEL MEJA OVAL bh
5 WASTAFEL GANTUNG BULAT bh 317,000
6 WASTAFEL GANTUNG SUDUT bh
7 WASTAFEL GANTUNG SUDUT KECIL bh
8 WASTAFEL BAK CUCI bh
9 TEMPAT SABUN GANTUNG bh
10 TEMPAT SABUN TANAM bh
URINOIR KERAMIK STANDART bh 1,393,000
BAK MANDI FIBRE GLASS 70.70.80 bh 317,000
11 SEPTIC TANK (ETERNIT GRESIK)
5 Pemakai 500 liter unit
10 Pemakai 1.000 liter unit
12 LAIN - LAIN
Kran Air 1/2" bh
Kran Air 3/4" bh 24,000
Seal tape bh 4,000
Floor drain bh 4,000
Roof drain kuningan bh

XIV ALAT PENGIKAT KAYU


1 PAKU - ukuran 1" s/d 4" kg 17,000
2 PAKU - payung kg
3 PAKU - sekrup kg 22,000
4 PAKU - beton kg
5 MUR BAUT (kuda-kuda) kg
6 ANGKUR BAUT bh
7 LEM KAYU bh 19,000
8 Tali Ijuk kg 2,500

XV POMPA AIR
1 POMPA AIR TANGAN
Dragon buatan Indonesia bh
2 POMPA AIR LISTRIK
Sanyo 100 watt bh
Fuji 250 watt bh
Shimizu . 100 watt bh
. 90 watt bh
Dab . 125 watt bh
. 175 watt bh

XVI PAVING BLOCK


1 SQUARE Abu-abu m2
Merah/hitam m2
2 HOLLAND Abu-abu m2
Merah/hitam m2

CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)

3 UNIDECOR Abu-abu m2
Merah/hitam m2
4 UNI Abu-abu m2
Merah/hitam m2
5 TRIHEX Abu-abu m2
Merah/hitam m2
6 OLYMPIA HEXA Abu-abu m2
7 HEXAGONAL Abu-abu m2
Merah/hitam m2
8 CASTLE Abu-abu m2
9 TRAPEZ Abu-abu m2
10 TRAPEZ GRASS BLOCK
Abu-abu m2
11 STANDARD GRASS BLOCK ABU-ABU BH
12 BATACO BH 3,000
13 KANSTEEN m'
14 Paving block natural 6 cm ( K- 175 ) m2 45,000
15 Paving block natural 8 cm ( K-175 ) m2 60,000
16 Paving block warna 6 cm ( K- 175 ) m2
17 Paving block warna 8 cm ( K-175 ) m2
Paving abu-abu tebal 6 cm m2 45,000
Paving abu-abu tebal 8 cm m2 60,000
Paving abu-abu K.225 tebal 6 cm m2 68,000
Paving abu-abu K.225 tebal 8 cm m2 80,000
Paving abu-abu K.275 tebal 6 cm m2 77,000
Paving abu-abu K.275 tebal 8 cm m2 90,000

MASTER BETON BOYOLALI (Pricelist 01 Oktober 2014)


1 Paving Block Holland 6 cm K-200-250 Natural bh
2 Paving Block Holland 6 cm K-250-300 Natural bh
3 Paving Block Holland 6 cm K-350-400 Natural bh
4 Paving Block Holland 8 cm K-250-300 Natural bh
5 Paving Block Holland 8 cm K-350-400 Natural bh
6 Paving Block Holland 10 cm K-450-500 Natural bh
7 Paving Block Kubus 6 cm K-250-300 Natural bh
8 Paving Block Kubus 8 cm K-250-300 Natural bh
9 Paving Block Kubus 8 cm K-350-400 Natural bh
10 Paving Block Segi Enam 6 cm K-200-250 Natural bh
11 Paving Block Segi Enam 6 cm K-250-300 Natural bh
12 Paving Block Segi Enam 6 cm K-350-400 Natural bh
13 Topi Uskup Besar 6 cm Natural bh
14 Grass Block Kotak 8cm Natural bh
15 Paving Block Holland 6 cm K-200-250 Warna bh
16 Paving Block Holland 6 cm K-250-300 Warna bh
17 Paving Block Holland 6 cm K-350-400 Warna bh
18 Paving Block Holland 8 cm K-250-300 Warna bh

CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)

19 Paving Block Holland 8 cm K-350-400 Warna bh


20 Paving Block Holland 10 cm K-450-500 Warna bh
21 Paving Block Kubus 6 cm K-250-300 Warna bh
22 Paving Block Kubus 8 cm K-250-300 Warna bh
23 Paving Block Kubus 8 cm K-350-400 Warna bh
24 Paving Block Segi Enam 6 cm K-200-250 Warna bh
25 Paving Block Segi Enam 6 cm K-250-300 Warna bh
26 Paving Block Segi Enam 6 cm K-350-400 Warna bh
27 Topi Uskup Besar 6 cm Warna bh
28 Grass Block Kotak 8cm Warna bh
29 Kansteen bh

ALDAS MUNTILAN (Pricelist 15 Februari 2014)


1 Paving Block Holland uk. 10,5 x 21 tb. 6 cm K-300 Natural bh
2 Paving Block Holland uk. 10,5 x 21 tb. 8 cm K-300 Natural bh
3 Paving Block Holland uk. 10,5 x 21 tb. 6 cm K-250 Natural bh
4 Paving Block Unipave uk. 11 x 22 tb. 8 cm K-300 Natural bh
5 Topi Uskup Kecil tb. 6 cm Natural bh
6 Topi Uskup Kecil tb. 8 cm Natural bh
4 Kanstin Standard uk. 10/12,5 x 30 x 50 K-300 bh
5 Kanstin Lubang uk. 10/12,5 x 30 x 50 K-300 bh
6 Kanstin Standard uk. 15/20 x 30 x 50 K-300 bh
7 Kanstin Lubang uk. 15/20 x 30 x 50 K-300 bh
8 Kanstin Standard uk. 18/21 x 30 x 50 K-300 bh
9 Kanstin Lubang uk. 18/21 x 30 x 50 K-300 bh
10 Grassblock Lubang Kotak uk. 10 x 40 x 40 bh
11 Grassblock Lubang Bulat uk. 10 x 48 x 48 bh

XVII LAIN -LAIN


1 KREI 25 MM m2
2 Sliding Pintu J4 bh
3 Naco rayban 5 mm per Daun bh 82,000
Naco bening 5 mm per Daun bh 91,000
4 Rolling door Besi m2 285,000
Rolling door Almunium m2 443,000
5 Awning Almunium m2
6 Kusen Almunium 4" Putih m' 72,000
7 Kusen Almunium 4" Coklat m' 78,000
7 WIDE FLANGE BEAM
150 X 75 X 5 X 7 X 12 btg

8 ASPAL.
Aspal Ex Pertamina isi Net 160 kg drum

Hotmix Tebal = 4 Cm m2

CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)

Hotmix Tebal = 5 Cm m2
Hotmix Tebal = 6 Cm m2
Hotmix Tebal = 7 Cm m2
Binder Course ton
Wearing Course ton
Hot Roller Sheet ton
Sand Sheet ton
Sand Sheet Emulsi ton
Cold Mix ton
Prime / Tack Coard RC liter
Prime Coat MC liter
Prime / Tack Coat Emulsi liter
10 K A C A
Cermin tebal 5 mm m2

11 PAGAR BRC. Pagar BRC 90 A2 /lb


Pagar BRC 120 A2 /lb
12 LAIN-LAIN
Minyak Beton & bekisting ltr 17,000
Pintu Lipat Besi 0.8 mm m2 660,000
Sunscreen Allumunim m2
Allumunium Foil m2
Soda api kg 33,000
Sabun kg
Air m3 80,000
Koas Alang-alang ikat
Solar (Industri) ltr 6,400
Premium (Industri) ltr 6,700
Pelumas ltr 19,000
Vynil 30 x 30 cm bh

13 WATER PROOFING 5 kg
5 kg
20 Ltr

XVIII BAHAN ALUMUNIUM


1 Alumunium Profil Warna Silver 4" tebal 1.2 mm m' 72,000
Warna Coklat 4" tebal 1.2 mm m' 78,000
Alumunium Coating White 4" tbl 1.2 mm m'

2 Aksesoris Engsel 4" bh


Engsel 3" bh
Cesement 16" set
Kait Angin bh
Rambuncis bh
Sealant tube

CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)

Skrup Fixer bh
Profil Kaca m'
Handle Pintu + Kunci set
Spagnolet Tanam bh
Door Closer set
Spandek PVC m2
Sindik Pintu bh
Floor Hinge Ex. Dekson set
Patch Fitting bh
Pull Handle set

CK Boyolali
HARGA HARGA HARGA INDEX
HARGA HARGA SURVEI I
INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp)
(Rp) (Rp) (Rp)

0.00
0.00 229,000.00
190,000.00 190,080.00 239,000.00 159,000
190,000.00 190,080.00 260,000.00 142,000
200,000.00 200,000.00 135,000.00
200,000.00 200,000.00 200,000.00 240,000
94,210.00 110,000.00 114,000
84,290.00 0.00 102,000
101,650.00 240,000.00 123,000
214,870.00 230,000.00 260,000
206,610.00 215,000.00 250,000
0.00 0.00
0.00 0.00
570.00 760 700
0.00 3400
0.00 3920
0.00 3700
0.00 3700
0.00
84,290.00 125000 102,000
185,000.00 131,400.00 210000 159,000
131,400.00 224000 159,000
42,970.00 72000 52,000
0.00 0
0.00 112000
198,340.00 275000 240,000
0.00 0
0.00
51,230.00 63200 62,000
51,230.00 0 62,000
0.00 0
0.00 0
0.00 0
1,340.00 1580 1,625
0.00 112000
0.00 140000
11,150.00 13500 13,500
0.00

CK Boyolali
HARGA HARGA HARGA INDEX
HARGA HARGA SURVEI I
INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp)
(Rp) (Rp) (Rp)
0.00
0.00 728000
0.00 42790
0.00
0.00
0.00 0
0.00 0
0.00 0
4,950.00 0 6,000
0.00 0
0.00 0
0.00 6280
0.00 6720
2,470.00 3,000
0.00
0.00
330.00 0 400
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
2,470.00 0 3,000
4,950.00 6,000
5,780.00 7,000
5,780.00 7,000
0.00 1250
0.00 2250
0.00 3600
0.00 2580
0.00 10640
0.00 9860
0.00 4480
0.00 7280
0.00 25200
1,810.00 2,200
1,730.00 2,100
1,480.00 1,800
1,400.00 1,700
0.00
0.00
0.00 0
0.00 0
0.00 0
0.00 0
0.00

CK Boyolali
HARGA HARGA HARGA INDEX
HARGA HARGA SURVEI I
INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp)
(Rp) (Rp) (Rp)
0.00
0.00 79300
0.00 0
0.00 105800
0.00 0
0.00 0
0.00 0
0.00 0
36,360.00 0 44,000
41,810.00 53800 50,600
47,270.00 0 57,200
54,540.00 72800 66,000
61,810.00 0 74,800
85,120.00 0 103,000 132000
0.00
0.00
0.00 0
0.00 0
0.00 0
0.00
31,400.00 0 38,000
0.00 0
0.00 0
0.00
0.00
17,350.00 0 21,000
0.00 0
0.00 0
0.00 0
0.00
0.00
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00
0.00 0
0.00 25200
0.00 35300
0.00 53800
33,050.00 0 40,000
0.00 0
0.00
0.00

CK Boyolali
HARGA HARGA HARGA INDEX
HARGA HARGA SURVEI I
INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp)
(Rp) (Rp) (Rp)
23,960.00 29,000
34,710.00 42,000
0.00
0.00 0
47,930.00 0 58,000
59,500.00 42600 72,000
79,330.00 58300 96,000
0.00 0
0.00
0.00
0.00 50000
0.00 75000
0.00 800
0.00 20000
0.00
0.00
0.00 26280000
0.00 23968000
0.00 21400000
13,537,190.00 16,380,000
11,454,540.00 13,860,000
14,578,510.00 17,640,000
12,495,860.00 15,120,000
0.00
7,561,980.00 9800000 9,150,000
7,318,180.00 9072000 8,855,000
0.00
6,063,630.00 6498000 7,337,000 6,000,000.00
7,639,660.00 5936000 9,244,000 6,000,000.00
0.00
5,227,270.00 5600000 6,325,000
4,704,950.00 5152000 5,693,000
0.00 3304000
0.00
0.00 3696000
2,090,900.00 3136000 2,530,000
0.00
9,789,250.00 12880000 11,845,000 9,500,000.00
9,028,920.00 11760000 10,925,000 9,500,000.00
0.00
3,136,360.00 3696000 3,795,000
2,614,040.00 3136000 3,163,000
0.00
16,520.00 20000 20,000
0.00 16000
0.00 25000

CK Boyolali
HARGA HARGA HARGA INDEX
HARGA HARGA SURVEI I
INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp)
(Rp) (Rp) (Rp)
0.00 0
0.00 812000
13,220.00 14200 16,000
0.00 33750
0.00 9700
0.00 26900
0.00
0.00
0.00
0.00 40320
0.00 31360
0.00 0
0.00 0
0.00 0
0.00
0.00 0
0.00 0
0.00
0.00 0
0.00 0
0.00 0
0.00
0.00
0.00 0
0.00 0
0.00 0
0.00 0
0.00
0.00 0
0.00 0
0.00 0
0.00 0
0.00
41,320.00 50400 50,000 42,000.00
42,140.00 0 51,000 49,000.00
0.00 0
0.00 0
0.00 0
38,010.00 46,000
42,140.00 51,000 45,000.00
52,890.00 64,000 47,000.00
44,620.00 54,000 49,000.00
44,620.00 54,000 49,000.00
0.00 0
0.00
0.00 0

CK Boyolali
HARGA HARGA HARGA INDEX
HARGA HARGA SURVEI I
INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp)
(Rp) (Rp) (Rp)
0.00
0.00 0
0.00
157,020.00 0 190,000
0.00 0
88,850.00 107520 107,520
0.00
0.00 60480
0.00 50400
0.00 58240
0.00 68320
0.00 90720
0.00 78400
0.00 98560
0.00 49280
0.00 57120
0.00 62720
0.00 72800
0.00 107520
0.00 85120
0.00 924000
0.00 284480
0.00 470400
0.00 154560
99,170.00 143360 120,000
0.00 201600
0.00 61600
0.00 154560
0.00
0.00 175000
0.00 15000
0.00 23000
0.00
0.00
0.00
0.00 0
27,270.00 39200 33,000
42,140.00 56000 51,000
52,060.00 67200 63,000
77,680.00 75100 94,000
115,700.00 0 140,000
0.00 0
0.00 100800
229,750.00 134100 278,000
78,510.00 95,000
86,770.00 105,000

CK Boyolali
HARGA HARGA HARGA INDEX
HARGA HARGA SURVEI I
INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp)
(Rp) (Rp) (Rp)
114,870.00 139,000
0.00 0
0.00 0
37,190.00 37000 45,000
47,100.00 42600 57,000
0.00 0
0.00
0.00
4,950.00 0 6,000
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00
0.00
9,090.00 10650 11,000
0.00 0
9,090.00 10650 11,000
0.00
4,130.00 10650 5,000
0.00
11,570.00 12900 14,000
14,870.00 18,000
0.00
0.00 0
0.00 0
0.00 616000
0.00 0
0.00 0
0.00 0
0.00 0
11,570.00 13900 14,000
0.00
15,700.00 16800 19,000
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 17250
0.00 16000

CK Boyolali
HARGA HARGA HARGA INDEX
HARGA HARGA SURVEI I
INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp)
(Rp) (Rp) (Rp)
26,440.00 32,000
0.00
0.00
23,140.00 23600 28,000 20,000.00
18,180.00 650 22,000
0.00 1750
0.00 1600
0.00 12600
0.00 21300
0.00 28000
0.00 75000
0.00
0.00
0.00
0.00
14,870.00 0 18,000
20,660.00 0 25,000
28,920.00 0 35,000
24,790.00 0 30,000
48,760.00 0 59,000
0.00 0
152,890.00 0 185,000
0.00 0
0.00 0
0.00 0
0.00 0
152,890.00 185,000 160000
48,760.00 59,000
24,790.00 30,000 29000
28,920.00 35,000 22000
20,660.00 25,000 20000
14,870.00 18,000 18000
0.00
0.00
89,250.00 0 108,000
109,090.00 0 132,000
163,630.00 0 198,000
287,600.00 0 348,000
361,980.00 0 438,000
0.00 0
565,280.00 0 684,000
555,370.00 0 672,000
1,259,500.00 0 1,524,000
0.00 0
0.00 0
0.00

CK Boyolali
HARGA HARGA HARGA INDEX
HARGA HARGA SURVEI I
INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp)
(Rp) (Rp) (Rp)
0.00
0.00 0
0.00 0
0.00 0
6,610.00 9700 8,000
0.00
62,800.00 67968 76,000
0.00 84096
0.00 9000
0.00 80000
0.00 75000
0.00 75000
0.00 65000
0.00 65000
0.00 12.57142857
0.00 75000
0.00 68000
0.00 7200
0.00 15000
0.00 8500
0.00 12500
0.00
0.00
0.00
0.00 0
0.00
0.00
0.00
0.00 0
0.00 0
52,890.00 0 64,000
0.00 0
0.00 0
0.00 0
0.00 0
0.00
52,890.00 50400 64,000 50,000.00
62,800.00 67200 76,000 60,000.00
0.00 84000
0.00
109,090.00 128800 132,000
138,840.00 168000 168,000
0.00 0
0.00 0
0.00 0
0.00

CK Boyolali
HARGA HARGA HARGA INDEX
HARGA HARGA SURVEI I
INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp)
(Rp) (Rp) (Rp)
0.00 85200
0.00 34800
0.00 46000
17,350.00 15700 21,000 15,000.00
0.00 66100
0.00
0.00
0.00
28,920.00 33600 35,000
13,220.00 23600 16,000 29,000.00
5,780.00 9600 7,000
0.00 22400
62,800.00 0 76,000 45,000.00
0.00 0
0.00 0
7,430.00 0 9,000
0.00 58300
0.00 39200
0.00 18000
42,140.00 0 51,000
42,140.00 0 51,000
0.00
0.00
0.00 0
0.00 0
13,220.00 23600 16,000
0.00 80640
0.00 0
0.00 0
0.00 112500
0.00 0
0.00 67200
0.00 67200
0.00 64960
17,350.00 21,000 19,000.00
0.00
0.00
28,920.00 33600 35,000 29,000.00
0.00 58300
62,800.00 0 76,000
0.00 23600
14,040.00 25200 17,000 10000
0.00 0
297,520.00 0 360,000
0.00
0.00 0

CK Boyolali
HARGA HARGA HARGA INDEX
HARGA HARGA SURVEI I
INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp)
(Rp) (Rp) (Rp)
0.00 0
15,700.00 0 19,000
0.00
0.00
57,850.00 0 70,000 55,000.00
78,510.00 60500 95,000 65,000.00
0.00 69500
0.00 106400
0.00
0.00 0
0.00 79600
0.00
0.00 0
67,760.00 68900 82,000 75,000.00
0.00 74500
0.00 117600
0.00
0.00 1200000
0.00
0.00
0.00
0.00
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00
0.00
0.00 0
0.00 0
0.00 0

CK Boyolali
HARGA HARGA HARGA INDEX
HARGA HARGA SURVEI I
INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp)
(Rp) (Rp) (Rp)
0.00 0
0.00
0.00
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00
0.00 0
0.00 0
0.00 0
0.00 0
0.00
0.00 0
0.00 0
0.00 0
0.00 0
0.00
0.00
0.00 0
0.00 0
49,580.00 0 60,000
131,400.00 0 159,000
0.00 0
49,580.00 67200 60,000
0.00
49,580.00 60,000
156,190.00 189,000
0.00
0.00
0.00 0
8,260.00 0 10,000 10,000.00
0.00 0
0.00 0
0.00 0
3,300.00 0 4,000
2,470.00 0 3,000
0.00 0
0.00
0.00
961,980.00 2184000 1,164,000 600,000.00
125,610.00 129000 152,000 145,000.00

CK Boyolali
HARGA HARGA HARGA INDEX
HARGA HARGA SURVEI I
INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp)
(Rp) (Rp) (Rp)
0.00 0
0.00 0
261,980.00 0 317,000 350,000.00
0.00 278000
0.00 0
0.00 0
0.00 0
0.00 0
1,151,230.00 1,393,000
261,980.00 317,000
0.00
0.00 0
0.00 0
0.00
0.00 17000
19,830.00 29500 24,000 15,000.00
3,300.00 3400 4,000
3,300.00 56000 4,000
0.00 79000
0.00
0.00
14,040.00 14600 17,000 12,000.00
0.00 0
18,180.00 0 22,000
0.00 0
0.00 0
0.00 0
15,700.00 0 19,000 13000
2,060.00 2500 2,500
0.00
0.00 24
0.00
0.00 0
0.00
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00
0.00
0.00 0
0.00 0
0.00 0
0.00 0

CK Boyolali
HARGA HARGA HARGA INDEX
HARGA HARGA SURVEI I
INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp)
(Rp) (Rp) (Rp)
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00
0.00 0
0.00 0
2,470.00 0 3,000
0.00 0
37,190.00 58240 45,000
49,580.00 91840 60,000
0.00 69440
0.00 103040
37,190.00 45,000
49,580.00 60,000
56,190.00 68,000
66,110.00 80,000
63,630.00 77,000
74,380.00 90,000
0.00
0.00
0.00 1270
0.00 1460
0.00 1580
0.00 2180
0.00 2450
0.00 3320
0.00 2810
0.00 3840
0.00 4310
0.00 2170
0.00 2510
0.00 2720
0.00 3280
0.00 7310
0.00 1510
0.00 1730
0.00 1880
0.00 2450

CK Boyolali
HARGA HARGA HARGA INDEX
HARGA HARGA SURVEI I
INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp)
(Rp) (Rp) (Rp)
0.00 2710
0.00 3640
0.00 3320
0.00 4310
0.00 4770
0.00 2590
0.00 2970
0.00 3220
0.00 4330
0.00 8340
0.00 26910
0.00
0.00
0.00 1860
0.00 2570
0.00 1690
0.00 2890
0.00 1250
0.00 2460
0.00 30360
0.00 36960
0.00 47520
0.00 52800
0.00 58080
0.00 55440
0.00 16050
0.00 23120
0.00
0.00
0.00
0.00 0
0.00 0
67,760.00 0 82,000
75,200.00 0 91,000
235,530.00 0 285,000
366,110.00 0 443,000
0.00 0
59,500.00 0 72,000
64,460.00 0 78,000
0.00
0.00 0
0.00
0.00
0.00 0
0.00
0.00 0

CK Boyolali
HARGA HARGA HARGA INDEX
HARGA HARGA SURVEI I
INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp)
(Rp) (Rp) (Rp)
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00
0.00 0
0.00
0.00 0
0.00 0
0.00
14,040.00 6000 17,000
545,450.00 0 660,000
0.00 0
0.00 8580
27,270.00 0 33,000
0.00 0
66,110.00 80000 80,000
0.00 0
5,280.00 0 6,400
5,530.00 0 6,700
15,700.00 0 19,000
0.00 0
0.00
0.00 78500
0.00 71000
0.00 525000
0.00
0.00
59,500.00 85000 72,000
64,460.00 108000 78,000
0.00 102000
0.00
0.00 28000
0.00 25500
0.00 75000
0.00 30000
0.00 35000
0.00 35000

CK Boyolali
HARGA HARGA HARGA INDEX
HARGA HARGA SURVEI I
INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp)
(Rp) (Rp) (Rp)
0.00 600
0.00 6000
0.00 250000
0.00 25000
0.00 455000
0.00 55000
0.00 15000
0.00 1490000
0.00 637000
0.00 260000
0.00

CK Boyolali
HARGA SURVEI II INTERNET (Rp)
(Rp)

REAL PLUS PPN

530.00

CK Boyolali
HARGA SURVEI II INTERNET (Rp)
(Rp)

40000 44000
46000 50600
52000 57200
60000 66000
68000 74800
110000 76000 83600

CK Boyolali
HARGA SURVEI II INTERNET (Rp)
(Rp)

40,000.00
48,000.00

55000
43000
45000
48000
49000

CK Boyolali
HARGA SURVEI II INTERNET (Rp)
(Rp)

50,000.00
60,000.00
65,000.00
75,000.00
85,000.00

90,000.00
100,000.00

CK Boyolali
HARGA SURVEI II INTERNET (Rp)
(Rp)

27,500.00
35,000.00

9,500.00

9,500.00

14,000.00

CK Boyolali
HARGA SURVEI II INTERNET (Rp)
(Rp)

15,000.00
35000

CK Boyolali
HARGA SURVEI II INTERNET (Rp)
(Rp)

59,000.00

100,000.00
140,000.00

CK Boyolali
HARGA SURVEI II INTERNET (Rp)
(Rp)

26,000.00
28,000.00

50,000.00

18,000.00

20000

CK Boyolali
HARGA SURVEI II INTERNET (Rp)
(Rp)

65,000.00

10,000.00

5000
5,000.00

650,000.00
140,000.00

CK Boyolali
HARGA SURVEI II INTERNET (Rp)
(Rp)

15,000.00

13000

CK Boyolali
DAFTAR SEWA PERALATAN

PEKERJAAN :
LOKASI :
TAHUN ANGGARAN :

NO. PERALATAN SATUAN HARGA(Rp)

1 Dump Truck 3 ton Jam 112,000


2 Dump Truck 5 ton Jam 168,000
3 Truk Bak Terbuka Jam 112,000
4 Truk Tanki Air Jam 156,800
5 Bulldozer Jam 425,600
6 Motor Grader Jam 190,400
7 Wheel Loader Jam 201,600
8 Excavator Jam 448,000
9 Crane Jam 1,512,000
10 Trailler Jam 224,000
11 Mesin Gilas Tandem 6 - 10 ton Jam 134,400
12 Mesin Gilas 3 roda 6 - 10 ton Jam 156,800
13 Mesin Gilas Roda Karet 8 - 10 ton Jam 190,400
14 Vibratory Roller Jam 44,800
15 Vibro roller 1 ton Jam 44,800
16 Water Pump Jam 16,800
17 Asphalt Sprayer Jam 39,200
18 Pick Up Jam 44,800
19 AMP Jam 3,920,000
20 Asphalt Finisher Jam 560,000
21 Concrete Vibrator Jam 44,800
22 Compressor Jam 112,000
23 Concrete Mixer Jam 72,800
24 Stamper Jam 33,600
25 Genset Jam 168,000
26 Alat Pengecat Marka Jam 78,400
27 Molen hr 252,000

CK Boyolali
DAFTAR SEWA PERALATAN

KET.

CK Boyolali
DAFTAR UPAH PEKERJA
TAHUN 2015 KABUPATEN SUKOHARJO

NO. JENIS BAHAN SATUAN HARGA (Rp)

1 Pekerja Hr
2 Mandor Hr
3 Tukang listrik Hr
4 Tukang kayu Hr
5 Kep. tk. kayu Hr
6 Tukang batu Hr
7 Kep. tk. batu Hr
8 Tukang besi Hr
9 Kep. tk. besi Hr
10 Tukang cat Hr
11 Kep. tk. cat Hr
12 Tukang plitur Hr
13 Tukang jalan Hr
14 Tukang gali Hr
15 Tukang masak aspal Hr
16 Tk. leideng Hr
17 Masinis Hr
18 Pemb. Masinis Hr
19 Penjaga api Hr
20 Penjaga malam Hr
21 Sopir Hr
22 Pembantu Sopir Hr

Sukoharjo, 2015

Diperiksa, Direncana
KEPALA BIDANG CIPTA KARYA KASI BINA TEKNIS
BIDANG CIPTA KARYA

Ir. SUHARTONO, MT. Ir. JOKO PRASENO


Pembina NIP. 19670209 199803 1 004
NIP. 19600305 199203 1 007
Mengetahui
KEPALA DINAS PEKERJAAN UMUM
KABUPATEN SUKOHARJO

Ir. ACHMAD HUFRONI, MT


Pembina Tingkat I
NIP. 19581120 199103 1 004

CK Boyolali
DAFTAR UPAH PEKERJA
TAHUN 2015 KABUPATEN SUKOHARJO

HARGA (Rp)

41,400.00
61,950.00
61,950.00
61,950.00
66,100.00
57,850.00
66,100.00
57,850.00
66,100.00
57,850.00
66,100.00
57,850.00
57,850.00
57,850.00
57,850.00
57,850.00
61,950.00
49,550.00
49,550.00
49,550.00
49,550.00
41,300.00

Sukoharjo, 2015

KASI BINA TEKNIS


BIDANG CIPTA KARYA

Ir. JOKO PRASENO


NIP. 19670209 199803 1 004

Mengetahui
KEPALA DINAS PEKERJAAN UMUM
KABUPATEN SUKOHARJO

Ir. ACHMAD HUFRONI, MT


Pembina Tingkat I
NIP. 19581120 199103 1 004

CK Boyolali
NO. URAIAN PEKERJAAN

E MENARA KECIL 4 buah (samping KUBAH)


9 Penangkal petir 1 speed 1 arde tembaga 6 mm
10 Lampu spot LED 50 watt x4 di tiga level (atas-tengah-bawah)
11 Cat-catan

G MENARA BESAR 2 buah TINGGI 40 M


i. Penangkal petir 1 speed 1 arde tembaga 6 mm
j. Lampu LED 50 watt x4 di tiga level (atas-tengah-bawah)

D PEKERJAAN LANTAI & SANITASI


17 Kloset Jongkok (setara toto)
18 Kloset duduk + jetshower( khusus difable)
19 Washtavel lengkap (kran, pipa kontrol sumbatan, port sabun cair dll)
20 Kaca Cermin 1,2*1,5 tebal 0,5 cm
21 Kran wudlu steinless steel 3/4"
22 Air bersih PVC 4" + knee (air kotor)
23 Air bersih PVC 3/4 " (pipa, Knee & shock drat kran)
24 Air bersih distribusi Down up/feet PVC 2"
25 Up water tank 4x1000 ltr steinless 1000 lt
26 Holder penguat pipa
27 Stop kran (maintenance)
28 Pompa suplay (grandfost)
29 Pompa Air Dalam (sumersible)
30 Pembuatan Sumur 60 m
31 Pipa air pemadam kebakaran 2"
32 Hidrant box dan House rool sheet lengkap
33 Rak sepatu stainlees 6 lapis lebar 2 m
35 Pasang saringan floor drain
38 Septictank & peresapan (36m3) 9 partisi
KM & Tempat WUDLU (Wanita)
45 Kloset duduk + jetshower
46 Kloset Jongkok (setara toto)
47 Kloset duduk + jetshower( khusus difable)

Page 95
NO. URAIAN PEKERJAAN

49 Washtavel lengkap (kran, pipa kontrol sumbatan, port sabun cair dll)
50 Kran wudlu steinless steel 3/4"
51 Air bersih PVC 4" + knee (air kotor)
52 Air bersih PVC 3/4 " (pipa, Knee & shock drat kran)
53 Air bersih PVC 2 " (pipa, Knee & shock drat kran)
54 Air bersih distribusi Down up/feet PVC 2"
55 Pasang saringan floor drain
56 hand reil steinlees ( KM/WC)
57 holder steinless (penggantung baju)
58 Septictank & peresapan (36m3)

D2 LANTAI MEZANIN
7 Washtavel setaraToto lengkap (kran, dll)
8 Closet duduk (setara toto) + jetshower
9 Kran wudlu steinless steel 3/4"
10 Air bersih PVC 4" + knee (air kotor)
11 Air bersih PVC 3/4 " (pipa, Knee & shock drat kran)
12 Air bersih PVC 2 " (pipa, Knee & shock drat kran)
13 Air bersih distribusi Down up/feet PVC 2"
14 Pasang saringan floor drain
15 hand reil steinlees ( KM/WC)

Page 96
NO. URAIAN PEKERJAAN

PEKERJAAN MEKANIK & ELEKTRIKAL


I LT I
1 TL LED 2x18 Watt SKY LED
2 TL LED 1x18 Watt SKY LED
3 Bulb LED 4 W Philips
4 Bulb LED 9 W Philips
5 Saklar Seri Broco Galio
6 Saklar Tunggal Broco Galio
7 Stopkontak Broco Galio
8 Exhaust Fan Ceiling KDK 30 cm
9 NYM 3x2,5 mm Eterna
10 Panel 40 x 60 x 20 TAV
11 MCB 6 A Sneider
12 NFB 3 P 40 A Sneider
13 NYY 4x6 mm Supreeme
14 Pasang kembali meter listrik

II Lantai Mezanin
1 TL LED 2x18 Watt SKY LED
2 Bulb LED 9 W Philips
3 Saklar Seri Broco Galio
4 Saklar Tunggal Broco Galio
5 Lampu Rebyong
6 Stopkontak Broco Galio
7 NYM 3x2,5 mm Eterna
8 Panel 40 x 60 x 20 TAV
9 MCB 6 A Sneider
10 Armatur lampu tembaga dia 40cm

III Lantai II
1 TL LED 2x18 Watt SKY LED
2 Bulb LED 9 W Philips
3 Saklar Seri Broco Galio
4 Saklar Tunggal Broco Galio
6 Stopkontak Broco Galio
7 NYM 3x2,5 mm Eterna
8 Panel 40 x 60 x 20 TAV

Page 97
NO. URAIAN PEKERJAAN

9 MCB 6 A Sneider
10 NFB 3 P 50 A Sneider
11 NYY 4x10 mm Supreeme
12 LVTC 4x25 mm
12 Penangkal Petir 1 spit 4 arde

IV Selasar utara-selatan
1 lampu LED Bulp 9 W, Philips
2 Armature Hias
3 saklar seri Broco Galio
4 NYM 2x2,5 mm, Eterna

V PEKERJAAN SOUND SYSTEM


1 Side file / monitor x 2 buah
Spek
- 2 unit speaker, 6 inci wofer, 1 inci tweter dome
- kapasitas 30 - 60 watt
- impedansi 8 Ω pada 100 volt line
- karakter bass reflek
2 Speaker out indor (Bustom)
foh 60 - 300 watt x 10 buah
spek
- 2 unit speaker 12 inci wofer, 1 inci speaker dome
- input 60 - 200 watt
- impedansi 8 Ω
- box kabinet
3 Speaker out dor coulumn x 6 buah
spek
- 4 unit speaker 4 inci
- input 10 - 20 watt
- impedansi 8 Ω pada 100 volt line
4 Speaker out dor horn x 8 buah
spek
- jenis horn
- kapasitas 50 watt
- mateing trafo input
- impedansi 8 Ω pada 100 volt line

Page 98
NO. URAIAN PEKERJAAN

5 System Power Amplifier


a. 1 buah amplifier stereo (foh lantai 1)
spek
- jenis sound standar amplifier (pabrikan)
- kapasitas 1600 watt
- output R 800 / L 800 pada 8 Ω
- input listrik 220 volt / 2000 watt
b. 1 buah power amplifier ( foh lantai 2 balkon)
spek
- jenis sound standar (pabrikan)
- kapasitas 800 watt
- output R 400 / L 400 pada 8 Ω
- input AC 220 volt / 1000 watt
c. 4 buah amplifier jenis ot kapsitas 240 watt
spek
- amplifier jenis ot
- kapasitas 240 watt
- output 240 / 280 watt 100 volt line
- input AC 220 volt pada 300 watt
d. 1 buah amplifier monitor (ot) 120 watt
6 System HV (Head Unit)
a. 1 buah mixer 8 ch digital efek
spek
- 8 ch input un baland
- 6 ch input stereo
- multi digital efek
- 4 ch system compresor
- 2 output level
- 2 output monitor
b. 1 buah ekualizer 2 x 32 ch
spek
- kapasitas 18 watt
- freg 20 hz - 20 khz
- 2 ch input / output
c. 1 buah DVD player
7 System microfon responsib
a. 2 buah micropon desktop (mimbar)

Page 99
NO. URAIAN PEKERJAAN

b. 1 bauh clips on micropon (imam)


c. 1 buah micropon dinamic brisket (azan)
d. 2 buah micropon dinamic standar
e. 1 buah mic again mc 100 system
8 Asoseries operasional system ( lantai 1 dan 2 )
a. 1 buah box panel (merk commax)
b. 5 buah suit / soft star
c. 6 ch input micropon respon unit
9 Asoseries operasional system (basement)
a. 1 buah box panel (commax)
b. 3 buah suit / soft star
10 System pengabelan dan pelistrikan
a. kabel speaker 2 x 0,75 mm standar x 14 roll
b. kabel listrik 2 x 1½ mm x 1 roll
c. kabel jumper audio x 1 roll
d. kabel jumper micropon 15 m x 2 = 30 m
e. pipa / pralon 40 biji
f. T dus besar 20 biji
g. spekom / kontra spekon 28 buah
h. 1 unit panel listrik
i. 1 buah stabilizer kapasitas 10.000 watt
j. 16 buah jack cannon jumper audio
11 System Speaker
a. speaker out / indor x 4 buah
spek
- 2 ubit speaker 10 inci wofer, 1 inci tweter superdome
- kapasitas 60 - 200 watt
- ipedansi 8 Ω pada 100 volt line
12 System Amplifier
a. 1 buah amplifier
spek
- kapasitas 240 watt
- 4 ch input mic
- 2 ch input aux
- 1 ch output / aux
13 System Micropon Responsib
a. 2 buah wireless vhf

Page 100
NO. URAIAN PEKERJAAN

14 System Packing / Hardcase


a. hardcase mixer 1 buah
b. hardcase power 3 buah

JUMLAH PEKERJAAN MEKANIKAL DAN ELEKTRIKAL =

PEKERJAAN PENATAAN LINGKUNGAN


I HARD SCAPE
F LISTRIK DAN PENERANGAN
1 Instalasi lampu taman
2 Pondasi dan Lampu taman

F Pekerjaan Lantai dan Sanitasi


8 Pasang closet jongkok setara KIA
9 Pasang instalasi air pipa 3/4" setara AW
10 Pasang kran 3/4"
11 Sumur Air bersih Bor minimal 16m Casing pipa 2"
12 Pompa air Up-down min 30m setara simitzu
13 Pasang saringan floor drain
14 Pipa pembuangan 4" + knee setara AW
15 Septictank (1,5x2x2)
14 Washtafel batu candi

G Pekerjaan Listrik dan Lampu


1 Panel box MCB lengkap
2 Pasang instalasi titik lampu
3 Pasang instalasistop kontak
4 Pasang lampu LED 7 watt
5 Pasang lampu LED 4 watt
6 Pasang Stop kontak (setara brocco)
7 Pasang Saklar Double (setara brocco)
8 Pasang Saklar Single

E Pekerjaan Lantai dan Sanitasi


5 Pasang Closet duduk setara KIA

Page 101
NO. URAIAN PEKERJAAN

4 Pasang closet jongkok setara KIA


6 Pasang instalasi air pipa 3/4" setara AW
7 Pasang kran 3/4"
8 Tangki air 75 ltr
9 Pasang holder steinless
10 Pasang saringan
11 Pipa pembuangan 4" setara AW
14 Washtafel batu candi

F Pekerjaan Listrik dan Lampu


2 Pasang instalasi titik lampu
3 Pasang instalasistop kontak
4 Pasang lampu LED 7 watt
5 Pasang lampu LED 4 watt
6 Pasang Stop kontak
7 Pasang Saklar Double

JUMLAH TK

VI Pekerjaan Lantai dan Sanitasi


5 Pasang Closet duduk setara KIA
6 Pasang instalasi air pipa 3/4" setara AW
7 Pasang kran 3/4"
8 Sumur Air bersih Bor minimal 16m Casing pipa 2"
9 Pompa air Up-down min 30m setara simitzu
10 Pasang saringan
11 Pipa pembuangan 4" setara AW
12 Septictank (1,5x2x2)

VII Pekerjaan Listrik dan Lampu


1 Panel box MCB lengkap
2 Pasang jaringan titik lampu
3 Pasang jaringan stop kontak
4 Pasang lampu LED 7 watt
5 Pasang lampu LED 4 watt
6 Pasang Stop kontak

Page 102
NO. URAIAN PEKERJAAN

7 Pasang Saklar Double


8 Pasang Saklar Single

JUMLAH RUMAH IM
PEKERJAAN LAIN-LAIN
4 CCTV 1 reciver 8 camera lengkap
5 1 unit PC i5 , HD 1 tera, & monitor LED 20"
JUMLAH PEKERJAA
REKAPITULASI
PEKERJAAN STRUKTUR MASJID
PEKERJAAN ARSITEKTUR MASJID
PEKERJAAN MEKANIK & ELEKTRIKAL
PEKERJAAN PENATAAN LINGKUNGAN
PEKERJAAN TK/PAUD
PEKERJAAN RUMAH IMAM
PEKERJAAN LAIN-LAIN

Terbilang : ...................................................................................................................................

Page 103
VOLUME HARGA SATUAN JUMLAH

16.00 set 37,500,000.00 600,000,000.00


48.00 bh 1,050,000.00 50,400,000.00
633.02 m2
JUMLAH E 650,400,000.00

4.00 set 37,500,000.00 150,000,000.00


36.00 bh 525,000.00 18,900,000.00
JUMLAH G 168,900,000.00
JUMLAH II = E+G 819,300,000.00

2.00 bh 852,843.00 1,705,686.00


1.00 unit 4,809,661.50 4,809,661.50
3.00 unit 3,057,213.00 9,171,639.00
3.00 bh 472,474.50 1,417,423.50
33.00 bh 337,781.25 11,146,781.25
36.00 m' 187,666.88 6,756,007.50
96.00 m' 23,182.50 2,225,520.00
14.00 m' 58,966.88 825,536.25
6.00 bh 33,000,000.00 198,000,000.00
8.00 bh 193,338.00 1,546,704.00
2.00 bh 337,781.25 675,562.50
1.00 unit 18,000,000.00 18,000,000.00
1.00 unit 9,000,000.00 9,000,000.00
60.00 m 450,000.00 27,000,000.00
170.00 m' 412,500.00 70,125,000.00
4.00 unit 12,000,000.00 48,000,000.00
4.00 unit 9,000,000.00 36,000,000.00
9.00 unit 166,909.50 1,502,185.50
1.00 unit 7,500,000.00 7,500,000.00

3.00 unit 4,164,755.25 12,494,265.75


3.00 unit 852,843.75 2,558,531.25
1.00 bh 4,809,661.50 4,809,661.50

Page 104
VOLUME HARGA SATUAN JUMLAH

12.00 bh 3,057,213.75 36,686,565.00


33.00 bh 337,781.25 11,146,781.25
36.00 m2 187,666.88 6,756,007.50
96.00 m' 23,182.50 2,225,520.00
14.00 m' 58,966.88 825,536.25
14.00 m' 58,966.88 825,536.25
9.00 unit 166,909.50 1,502,185.50
5.00 unit 2,250,000.00 11,250,000.00
5.00 unit 166,909.50 834,547.50
1.00 unit 7,500,000.00 7,500,000.00
JUMLAH D1 554,822,844.75

4.00 bh 3,462,213.75 13,848,855.00


4.00 bh 4,164,755.25 16,659,021.00
2.00 bh 337,781.25 675,562.50
12.00 m2 187,666.88 2,252,002.50
18.00 m' 23,182.50 417,285.00
24.00 m' 58,966.88 1,415,205.00
72.00 m' 58,966.88 4,245,615.00
4.00 unit 166,909.50 667,638.00
4.00 unit 2,250,000.00 9,000,000.00
JUMLAH D2 49,181,184.00
JUMLAH D = D1+D2 604,004,028.75

Page 105
VOLUME HARGA SATUAN JUMLAH

41.00 titik 492,875.63 20,207,900.63


24.00 titik 291,575.63 6,997,815.00
2.00 titik 56,945.63 113,891.25
22.00 titik 80,705.63 1,775,523.75
21.00 buah 79,200.00 1,663,200.00
12.00 buah 67,650.00 811,800.00
6.00 buah 74,085.00 444,510.00
6.00 buah 948,337.50 5,690,025.00
400.00 m 57,172.50 22,869,000.00
1.00 buah 638,250.00 638,250.00
6.00 buah 93,900.00 563,400.00
2.00 buah 562,500.00 1,125,000.00
50.00 m 78,952.50 3,947,625.00
1.00 paket 2,250,000.00 2,250,000.00
JUMLAH I 69,097,940.63

31.00 titik 492,875.63 15,279,144.38


47.00 titik 80,705.63 3,793,164.38
22.00 buah 79,200.00 1,742,400.00
4.00 buah 67,650.00 270,600.00
5.00 buah 8,207,244.38 41,036,221.88
10.00 buah 74,085.00 740,850.00
300.00 m 57,172.50 17,151,750.00
1.00 buah 638,250.00 638,250.00
6.00 buah 93,900.00 563,400.00
19.00 bh 675,000.00 12,825,000.00
JUMLAH II 94,040,780.63

49.00 titik 492,875.63 24,150,905.63


20.00 titik 80,705.63 1,614,112.50
16.00 buah 79,200.00 1,267,200.00
2.00 buah 67,650.00 135,300.00
11.00 buah 74,085.00 814,935.00
300.00 m 57,172.50 17,151,750.00
1.00 buah 638,250.00 638,250.00

Page 106
VOLUME HARGA SATUAN JUMLAH

6.00 buah 93,900.00 563,400.00


1.00 buah 819,300.00 819,300.00
20.00 m 112,282.50 2,245,650.00
150.00 m 42,817.50 6,422,625.00
1.00 unit 14,092,500.00 14,092,500.00
JUMLAH III 69,915,928.13

46.00 buah 80,705.63 3,712,458.75


46.00 buah 750,000.00 34,500,000.00
6.00 buah 79,200.00 475,200.00
200.00 m 46,282.50 9,256,500.00
JUMLAH IV 47,944,158.75

2.00 unit 8,550,000.00 17,100,000.00

10.00 unit 1,190,250.00 11,902,500.00

6.00 unit 12,375,000.00 74,250,000.00

8.00 unit 6,540,000.00 52,320,000.00

Page 107
VOLUME HARGA SATUAN JUMLAH

1.00 unit 5,625,000.00 5,625,000.00

1.00 unit 6,375,000.00 6,375,000.00

4.00 unit 4,867,500.00 19,470,000.00

1.00 4,725,000.00 4,725,000.00

1.00 unit 4,800,000.00 4,800,000.00

1.00 unit 7,155,000.00 7,155,000.00

1.00 unit 1,800,000.00 1,800,000.00

2.00 buah 2,475,000.00 4,950,000.00

Page 108
VOLUME HARGA SATUAN JUMLAH

1.00 buah 1,290,000.00 1,290,000.00


1.00 buah 1,447,500.00 1,447,500.00
2.00 buah 1,395,000.00 2,790,000.00
1.00 buah 1,147,500.00 1,147,500.00

1.00 unit 3,802,500.00 3,802,500.00

1.00 unit 2,647,500.00 2,647,500.00

14.00 buah 6,975,000.00 97,650,000.00


1.00 buah 3,375,000.00 3,375,000.00
1.00 buah 4,350,000.00 4,350,000.00
30.00 buah 2,767,500.00 83,025,000.00
40.00 buah 630,000.00 25,200,000.00
20.00 buah 675,000.00 13,500,000.00
28.00 buah 420,000.00 11,760,000.00
1.00 buah 9,750,000.00 9,750,000.00
1.00 buah 1,875,000.00 1,875,000.00
16.00 buah 727,500.00 11,640,000.00

4.00 unit 7,500,000.00 30,000,000.00

1.00 unit 4,867,500.00 4,867,500.00

2.00 unit 3,300,000.00 6,600,000.00

Page 109
VOLUME HARGA SATUAN JUMLAH

1.00 unit 375,000.00 375,000.00


3.00 unit 1,125,000.00 3,375,000.00
JUMLAH V 530,940,000.00
L = I+II+III+IV+V 811,938,808.13

40.00 titik 840,631.61 33,625,264.20


40.00 bh 5,625,000.00 225,000,000.00
JUMLAH F 258,625,264.20
JUMLAH I = F 258,625,264.20

3.00 bh 852,843.75 2,558,531.25


43.00 m' 23,182.50 996,847.50
8.00 bh 382,781.25 3,062,250.00
1.00 paket 12,750,000.00 12,750,000.00
1.00 unit 3,750,000.00 3,750,000.00
4.00 bh 166,909.50 667,638.00
47.00 m' 187,666.88 8,820,343.13
1.00 unit 6,000,000.00 6,000,000.00
4.00 bh 2,250,000.00 9,000,000.00
JUMLAH F 47,605,609.88

1.00 unit 704,250.00 704,250.00


23.00 titik 840,631.61 19,334,526.92
8.00 titik 1,078,063.50 8,624,508.00
17.00 bh 78,890.63 1,341,140.63
6.00 bh 61,730.63 370,383.75
8.00 bh 59,235.00 473,880.00
6.00 bh 53,295.00 319,770.00
3.00 bh 53,295.00 159,885.00
JUMLAH G 31,328,344.29
JUMLAH I = F+G 78,933,954.17

1.00 bh 3,769,848.75 3,769,848.75

Page 110
VOLUME HARGA SATUAN JUMLAH

1.00 bh 852,843.75 852,843.75


21.00 m' 23,182.50 486,832.50
2.00 bh 337,781.25 675,562.50
1.00 bh 1,500,000.00 1,500,000.00
2.00 bh 193,338.00 386,676.00
6.00 bh 166,909.50 1,001,457.00
18.00 m' 187,666.88 3,378,003.75
2.00 bh 2,250,000.00 4,500,000.00
JUMLAH E 16,551,224.25

20.00 titik 840,631.61 16,812,632.10


9.00 titik 1,078,063.77 9,702,573.93
18.00 bh 78,890.63 1,420,031.25
2.00 bh 61,730.63 123,461.25
9.00 bh 67,485.00 607,365.00
6.00 bh 59,235.00 355,410.00
JUMLAH F 29,021,473.53
JUMLAH II = E+F 45,572,697.78
LAH TK/PAUD = I+II 124,506,651.95

1.00 bh 3,769,848.75 3,769,848.75


32.00 m' 23,182.50 741,840.00
3.00 bh 337,781.25 1,013,343.75
1.00 paket 11,250,000.00 11,250,000.00
1.00 bh 3,750,000.00 3,750,000.00
1.00 bh 1,669,095.00 1,669,095.00
14.00 bh 187,666.88 2,627,336.25
1.00 unit 3,750,000.00 3,750,000.00
JUMLAH VI 28,571,463.75

1.00 unit 704,250.00 704,250.00


8.00 titik 840,631.61 6,725,052.84
3.00 titik 1,078,063.77 3,234,191.31
5.00 bh 78,890.63 394,453.13
3.00 bh 61,730.63 185,191.88
3.00 bh 67,485.00 202,455.00

Page 111
VOLUME HARGA SATUAN JUMLAH

2.00 bh 59,235.00 118,470.00


3.00 bh 53,295.00 159,885.00
JUMLAH VII 11,723,949.15
MAH IMAM = VI+VII 40,295,412.90

1.00 paket 75,000,000.00 75,000,000.00


1.00 unit 37,500,000.00 37,500,000.00
ERJAAN LAIN-LAIN 112,500,000.00

811,938,808.13

124,506,651.95
40,295,412.90
112,500,000.00
JUMLAH 1,089,240,872.97
PPN 10% 108,924,087.30
JUMLAH TOTAL 1,198,164,960.27
DIBULATKAN

...............................................................................................................

…………………. , ……………………… 2017

PT . ……………………

NAMA TERANG
Direktur

Page 112
HARGA JUMLAH
No. KOEF SAT. #REF! BAHAN/UPAH
Rp Rp
HARGA SATUAN PEKERJAAN BEGESTING
1 1 m2 Memasang Bekisting untuk Pondasi #REF!
A Tenaga #REF!
0.52 OH Pekerja #REF! #REF!
0.26 OH Tukang Kayu #REF! #REF!
0.03 OH Kepala Tukang #REF! #REF!
0.03 OH Mandor #REF! #REF!
B Bahan #REF!
0.01 m3 Kayu Klas III #REF! #REF!
0.20 Kg Paku Biasa 2" - 5" #REF! #REF!
0.10 Ltr Minyak Bekisting #REF! #REF!
C PERALATAN
D Jumlah A + B + C #REF!
E Overhead & Profit 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

2 1 m2 Memasang Bekisting untuk Sloof #REF!


A Tenaga #REF!
0.52 OH Pekerja #REF! #REF!
0.26 OH Tukang Kayu #REF! #REF!
0.03 OH Kepala Tukang #REF! #REF!
0.03 OH Mandor #REF! #REF!
B Bahan #REF!
0.02 m3 Kayu Klas III #REF! #REF!
0.20 Kg Paku Biasa 2" - 5" #REF! #REF!
0.10 Ltr Minyak Bekisting #REF! #REF!
C PERALATAN
D Jumlah A + B + C #REF!
E Overhead & Profit 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

3 1 m2 Memasang Bekisting untuk Kolom #REF!


A Tenaga #REF!
0.66 OH Pekerja #REF! #REF!
0.33 OH Tukang Kayu #REF! #REF!
0.03 OH Kepala Tukang #REF! #REF!
0.03 OH Mandor #REF! #REF!
B Bahan #REF!
0.01 m3 Kayu Klas III #REF! #REF!
0.27 Kg Paku Biasa 2" - 5" #REF! #REF!
0.20 Ltr Minyak Bekisting #REF! #REF!
0.01 m3 Balok Kayu Klas II #REF! #REF!
0.12 Lbr Plywood tebal 9mm #REF! #REF!
0.67 Btg Bambu #REF! #REF!
C PERALATAN
D Jumlah A + B + C #REF!
E Overhead & Profit 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

4 1 m2 Memasang Bekisting untuk Balok #REF!


A Tenaga #REF!
0.66 OH Pekerja #REF! #REF!
0.33 OH Tukang Kayu #REF! #REF!
0.03 OH Kepala Tukang #REF! #REF!
0.03 OH Mandor #REF! #REF!
B Bahan #REF!
0.01 m3 Kayu Klas III #REF! #REF!
0.27 Kg Paku Biasa 2" - 5" #REF! #REF!
0.20 Ltr Minyak Bekisting #REF! #REF!
0.01 m3 Balok Kayu Klas II #REF! #REF!
0.12 Lbr Plywood tebal 9mm #REF! #REF!
0.67 Btg Bambu #REF! #REF!
C PERALATAN
D Jumlah A + B + C #REF!
E Overhead & Profit 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

5 1 m2 Memasang Bekisting untuk Lantai #REF!

CK Boyolali
A Tenaga #REF!
0.66 OH Pekerja #REF! #REF!
0.33 OH Tukang Kayu #REF! #REF!
0.03 OH Kepala Tukang #REF! #REF!
0.03 OH Mandor #REF! #REF!
B Bahan #REF!
0.04 m3 Kayu Klas III #REF! #REF!
0.40 Kg Paku Biasa 2" - 5" #REF! #REF!
0.20 Ltr Minyak Bekisting #REF! #REF!
0.02 m3 Balok Kayu Klas II (Borneo) #REF! #REF!
0.35 Lbr Plywood tebal 9mm #REF! #REF!
6.00 Btg Bambu #REF! #REF!
C PERALATAN
D Jumlah A + B + C #REF!
E Overhead & Profit 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

6 1 m2 Memasang Bekisting untuk Dinding #REF!


A Tenaga #REF!
0.66 OH Pekerja #REF! #REF!
0.33 OH Tukang Kayu #REF! #REF!
0.03 OH Kepala Tukang #REF! #REF!
0.03 OH Mandor #REF! #REF!
B Bahan #REF!
0.02 m3 Kayu Klas III #REF! #REF!
0.30 Kg Paku Biasa 2" - 5" #REF! #REF!
0.20 Ltr Minyak Bekisting #REF! #REF!
0.01 m3 Balok Kayu Klas II #REF! #REF!
0.18 Lbr Plywood tebal 9mm #REF! #REF!
1.50 Btg Bambu #REF! #REF!
4.00 Buah Formite/Penjaga jarak / Spacer (alat bantu) 5,000.00 20,000.00
C PERALATAN
D Jumlah A + B + C #REF!
E Overhead & Profit 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

7 1 m2 Memasang Bekisting untuk Tangga #REF!


A Tenaga #REF!
0.66 OH Pekerja #REF! #REF!
0.33 OH Tukang Kayu #REF! #REF!
0.03 OH Kepala Tukang #REF! #REF!
0.03 OH Mandor #REF! #REF!
B Bahan #REF!
0.02 m3 Kayu Klas III #REF! #REF!
0.30 Kg Paku Biasa 2" - 5" #REF! #REF!
0.15 Ltr Minyak Bekisting #REF! #REF!
0.01 m3 Balok Kayu Klas II #REF! #REF!
0.18 Lbr Plywood tebal 9mm #REF! #REF!
1.00 Btg Bambu #REF! #REF!
C PERALATAN
D Jumlah A + B + C #REF!
E Overhead & Profit 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

CK Boyolali
No. KOEF SAT. #REF!

HARGA SATUAN PEKERJAAN PEMINDAHAN TANAMAN


1 1 BTG Memindahkan Tanaman Sedang (dalam satu area)
A TENAGA
2.00 OH Pekerja
1.00 OH Mandor
B BAHAN
1.20 m3 Air
0.50 m3 Tanah Subur
1.00 btg Bambu penegak
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)

2 1 BTG Memindahkan Tanaman Kecil (dalam satu area)


A TENAGA
0.50 OH Pekerja
0.250 OH Mandor
B BAHAN
0.600 m3 Air
0.25 m3 Tanah Subur
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)

CK Boyolali
HARGA JUMLAH
BAHAN/UPAH
Rp Rp

#REF!
#REF!
#REF! #REF!
#REF! #REF!
#REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!

#REF!
#REF!
#REF!

#REF!
#REF!
#REF! #REF!
#REF! #REF!
#REF!
#REF! #REF!
#REF! #REF!

#REF!
#REF!
#REF!

CK Boyolali
Resume

1
2
3
4
5
6
7
Posisi Rumah Pompa
Poisisi Panel Listrik dimana ?
Penataan Kabel tanpa Kabel tray
Gambar Line Diagram elektrikal
Apakah ada sistem Water heater ( Kran wastafel type : panas /dingin )
BQ Instlasi Air hujan
Sumber Hydrant darimana ?
Instalasi Hydrant