PEKERJAAN : -
LOKASI : -
TAHUN ANGGARAN : -
I BAHAN DASAR
1 BATU KALI Bulat Utuh m3
Bulat Belah m3 190,000 190,000.00
Pecah 10/15 m3 190,000 190,000.00
Pecah 5/7 m3 200,000 200,000.00
Pecah 3/5 m3 198,300 200,000.00
2 KERIKIL Timbunan Pilihan m3 114,000
Sawur / Koral m3 84,200
Beton 0,5/1 m3 101,600
Beton 1/2 m3 214,850
Beton 2/3 m3 206,000
Biasa m3
Tras Giling m3
3 BATU BATA ex lokal bh 650
Concrete Blok (CB 15) / Batako (Lubang2) bh
Batako Padat bh
Rosteer beton cetak 12 x 11 x 24 cm bh
Rosteer tanah liat bakar 12 x 11 x 24 cm bh
II B A H A N P E N U T U P A T A P
1 SIRAP (100 lbr) pak
Sirap asbes semen m2
2 GENTENG BETON
Genteng Beton Warna standard bh
Genteng Beton Warna Special bh
Genteng Beton Warna Khusus bh
Kerpus Beton Warna Standard bh 4,900
Kerpus Beton Warna Special bh
Kerpus Beton Warna Khusus bh
Genteng beton ex. Mutiara bh
CK Boyolali
HARGA HARGA
NO. J E N I S B A H A N SATUAN
(Rp) KESEPAKATAN
4 GENTENG KACA
Vlaam tebal 2 mm bh
Vlaam tebal 3 mm bh
Kodok tebal 2 mm bh
Kodok tebal 3 mm bh
CK Boyolali
HARGA HARGA
NO. J E N I S B A H A N SATUAN
(Rp) KESEPAKATAN
6 ASBES PLAT
. 100cm X 100 cm X 3 mm bh 17,300
. 100cm X 100 cm X 4 mm bh
. 50 cm X 200 cm X 3 mm bh
. 40 cm X 200 cm X 3 mm bh
III B A H A N K A Y U
1 JATI Papan m3
Balok/pesagen m3
Reng m3
Balok kelas II m3 13,537,100
Balok kelas III m3 11,454,500
Papan kelas II m3 14,578,500
Papan kelas III m3 12,495,800
CK Boyolali
HARGA HARGA
NO. J E N I S B A H A N SATUAN
(Rp) KESEPAKATAN
Balok/pesagen m3 2,000,000
4 UBIN PORSELIN
Lokal 11 X 11 putih dos
11 X 11 warna dos
Lokal 15 X 15 putih dos
15 X 15 warna dos
5 MOZAIK PORSELIN
10 X 20 cm m2
15 X 15 cm m2
20 X 20 cm m2
20 X 25 cm m2
CK Boyolali
HARGA HARGA
NO. J E N I S B A H A N SATUAN
(Rp) KESEPAKATAN
10 GRANITO 40 x 40 cm m2 157,000
30 x 30 cm m2
11 Marmer m2 98,000
V.BAHAN CETAK
1 BUIS BETON Ø 10 cm - 100 cm bh
Ø 20 cm - 100 cm bh 27,250
Ø 30 cm - 100 cm bh 42,100
Ø 40 cm - 100 cm bh 52,000
Ø 50 cm - 100 cm bh 77,650
Ø 60 cm - 100 cm bh 115,700
Ø 70 cm - 100 cm bh
Ø 80 cm - 100 cm bh
Ø 100 cm - 100 cm bh 229,700
Ø 80 cm - 50 cm bh 78,500
Ø 90 cm - 50 cm bh 86,700
CK Boyolali
HARGA HARGA
NO. J E N I S B A H A N SATUAN
(Rp) KESEPAKATAN
Ø 100 cm - 50 cm bh 114,800
U 10 cm - 100 cm bh
U 15 cm - 100 cm bh
U 20 cm - 100 cm bh 37,150
U 30 cm - 100 cm bh 47,100
U 50 cm - 100 cm bh
VI B A H A N B E S I
1 BESI BETON besi beton polos kg 10,000
besi beton prestress kg
besi beton ulir kg 10,000
7 LAIN-LAIN
Paku asbes kg 23,100
Paku sekrup asbes bh 18,100
Paku crampon bh
Dynabolt ukuran 8 mm x 65 mm bh
Baut gording kg
Hollow Galvanis 2.4. 400 bt
Hollow Galvanis 4.4. 400 bt
Baja Ringan C.75 ex. Taso bt
Skrup Fixer bh 750
CK Boyolali
HARGA HARGA
NO. J E N I S B A H A N SATUAN
(Rp) KESEPAKATAN
Sealant bh 50,000
Venetions Blinds atau Vertical Blinds (tirai) m2 95,000
VII B A H A N P I P A
1 Pipa PVC SII SCJ , S - 12,5 (10 bar)
Pipa PVC DN 20 ( ½" ) AW JIS btg 14,800
Pipa PVC DN 25 ( ¾" ) AW JIS btg 20,600
Pipa PVC DN 32 ( 1" ) AW JIS btg 28,900
Pipa PVC DN 40 ( 1½" ) btg 24,700
Pipa PVC DN 63 ( 2" ) btg 48,700
Pipa PVC DN 90 ( 3" ) btg -
Pipa PVC DN 110 ( 4" ) btg 152,800
Pipa PVC DN 160 ( 6" ) btg -
Pipa PVC DN 200 ( 8" ) btg -
Pipa PVC DN 250 ( 10" ) btg -
Pipa PVC DN 315 ( 12" ) btg -
Pipa PVC Ø 4" (AW - SCJ) 4 m 152,800
Pipa PVC Ø 2" (AW - SCJ) 4 m 48,700
Pipa PVC Ø 1 1/2" (AW - SCJ) 4 m 24,700
Pipa PVC Ø 1" (AW - SCJ) 4 m 28,900
Pipa PVC Ø 3/4" (AW - SCJ) 4 m 20,600
Pipa PVC Ø 1/2" (AW - SCJ) 4 m 14,800
VIII B A H A N L A N G I T - L A N G I T
1 AKUSTIK-uk : 30 X 30 lbr
30 X 60 lbr
60 X 120 lbr
List Kayu Profil m' 6,600
2 SOFT BOARD-uk: 4'X 8' (1,2 x2,4 m2)
Gypsum tebal 9 mm lbr 60,000
Gypsum tebal 12 mm lbr
List Gypsum m'
Gypsum tebal 9 mm (120 x 240) lbr
lbr
lbr
lbr
lbr
Sekrup Gypsum bh
Compound zak
GRC Board lbr
Dinabolt Bh
Cotton Plaster bh
List Gypsum m'
CK Boyolali
HARGA HARGA
NO. J E N I S B A H A N SATUAN
(Rp) KESEPAKATAN
Tepung Gypsum kg
4 PLY WOOD
Teak wood
90 X 210 X 3 mm lbr
. 120 X 240 X 3 mm lbr 80,000
. 90 X 210 X 4 mm lbr 52,800
. 90 X 210 X 9 mm lbr
. 90 X 210 X 12 mm lbr
. 90 X 210 X 15 mm lbr
. 90 X 210 X 18 mm lbr
Tripleks
. 120 X 240 X 3 mm lbr 52,800
. 120 X 240 X 4 mm lbr 62,800
. 120 X 240 X 6 mm lbr
Multipleks
. 120 X 240 X 9 mm lbr 109,000
. 120 X 240 X 12 mm lbr 138,800
. 120 X 240 X 15 mm lbr
. 120 X 240 X 18 mm lbr
Formika ukuran pintu lbr 75,000
2 TEMBOK
Kalkarium kg
Kapur sirih kg
Plamur kg 13,200
Cat Tembok ex. Nippon Weatherbond kg
Sintex 5 kg
Danabride 5 kg
Catylac 5 kg
CK Boyolali
HARGA HARGA
NO. J E N I S B A H A N SATUAN
(Rp) KESEPAKATAN
Mowilex 5 kg
Alkali Tembok ex. Nippon 3-in 1 Anti-Alkali Primer Sealer kg
MOWILEX PRECOAT VARNISH BATU ALAM lt
Mowilex Clear Coating lt
Cat tembok kg 16,000
3 BESI
Menie kg 27,250
Cat mengkilat kg
Cat kg 50,000
Thinner A ltr
Minyak cat ltr 14,000
Thinner Super ltr
Residu (teer/aspal) drum 296,000
Fibre glass (tanki air)
kapasitas 550 liter. bh
kapasitas 1100 liter. bh
Lem Aica Aibon kg 15,700
X BAHAN KACA
1 POLOS 3 mm m2 57,000
5 mm m2 78,000
8 mm m2
12 mm m2
2 ES KABUR 3 mm m2
5 mm m2
3 RAY BAND 3 mm m2
5 mm m2 89,000
8 mm m2
12 mm m2
4 TEMPERED 12 mm m2
CK Boyolali
HARGA HARGA
NO. J E N I S B A H A N SATUAN
(Rp) KESEPAKATAN
2 SKAKELAR
Out bauw . Seri bh
Engkel bh
In bauw . Seri bh
Engkel bh
4 STEKER - Biasa bh
Arde bh
T Biasa bh
T dengan Arde bh
5 FITING Flaon bh
Gantung bh
Kap bh
Kombinasi bh
CK Boyolali
HARGA HARGA
NO. J E N I S B A H A N SATUAN
(Rp) KESEPAKATAN
CK Boyolali
HARGA HARGA
NO. J E N I S B A H A N SATUAN
(Rp) KESEPAKATAN
XVII L A I N - L A I N
CK Boyolali
HARGA HARGA
NO. J E N I S B A H A N SATUAN
(Rp) KESEPAKATAN
1 KREI 25 MM m2
2 Sliding Pintu J4 bh
3 Naco rayban 5 mm per Daun bh 82,000
Naco bening 5 mm per Daun bh 91,000
4 Rolling door Besi m2 285,000
Rolling door Almunium m2 443,000
5 Awning Almunium m2
6 Kusen Almunium 4" Putih m' 73,500
7 Kusen Almunium 4" Coklat m' 78,500
7 WIDE FLANGE BEAM
150 X 75 X 5 X 7 X 12 btg
Besi Holo rangka gypsum m1 6,250
8 ASPAL.
Aspal Ex Pertamina isi Net 160 kg drum
Hotmix Tebal = 4 Cm m2
Hotmix Tebal = 5 Cm m2
Hotmix Tebal = 6 Cm m2
Hotmix Tebal = 7 Cm m2
Binder Course ton
Wearing Course ton
Hot Roller Sheet ton
Sand Sheet ton
Sand Sheet Emulsi ton
Cold Mix ton
Prime / Tack Coard RC liter
Prime Coat MC liter
Prime / Tack Coat Emulsi liter
10 K A C A
Cermin tebal 5 mm m2
13 WATER PROOFING 5 kg
5 kg
20 Ltr
CK Boyolali
HARGA HARGA
NO. J E N I S B A H A N SATUAN
(Rp) KESEPAKATAN
CK Boyolali
HARGA HARGA HARGA INDEX HARGA SURVEI I HARGA SURVEI II
INDEK/1.21 BOYOLALI 2015 (Rp) (Rp)
(Rp) (Rp) (Rp)
0.00
0.00 229,000.00
157,020.00 239,000.00 159,000
157,020.00 260,000.00 142,000
165,280.00 135,000.00
163,880.00 200,000.00 240,000
94,210.00 110,000.00 114,000
69,580.00 0.00 102,000
83,960.00 240,000.00 123,000
177,560.00 230,000.00 260,000
170,240.00 215,000.00 250,000
0.00 0.00
0.00 0.00
530.00 760 700 530.00
0.00 3400
0.00 3920
0.00 3700
0.00 3700
0.00
86,770.00 125000 102,000
152,890.00 210000 159,000
152,890.00 224000 159,000
35,120.00 72000 52,000
0.00 0
0.00 112000
163,630.00 275000 240,000
0.00 0
0.00
51,230.00 63200 62,000
51,230.00 0 62,000
0.00 0
0.00 0
0.00 0
1,100.00 1580 1,625
0.00 112000
0.00 140000
1,450.00 13500 13,500
0.00
0.00
0.00 728000
0.00 42790
0.00
0.00
0.00 0
0.00 0
0.00 0
4,040.00 0 6,000
0.00 0
0.00 0
0.00 6280
CK Boyolali
HARGA HARGA HARGA INDEX HARGA SURVEI I HARGA SURVEI II
INDEK/1.21 BOYOLALI 2015
(Rp) (Rp) (Rp) (Rp) (Rp)
0.00 6720
1,980.00 3,000
0.00
0.00
330.00 0 400
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
1,900.00 0 3,000
4,000.00 6,000
4,700.00 7,000
4,700.00 7,000
1250
2250
3600
2580
10640
9860
4480
7280
25200
1,500.00 2,200
1,400.00 2,100
1,100.00 1,800
1,100.00 1,700
0.00
0.00
0.00 0
0.00 0
0.00 0
0.00 0
0.00
0.00
0.00 79300
0.00 0
0.00 105800
0.00 0
0.00 0
0.00 0
0.00 0
33,050.00 0
38,010.00 53800
42,970.00 0
49,580.00 72800
56,190.00 0
62,800.00 0 132000 110000
53,710.00
47,680.00
0.00
0.00 0
0.00 0
0.00 0
0.00
25,950.00 0 38,000
0.00 0
0.00 0
CK Boyolali
HARGA HARGA HARGA INDEX HARGA SURVEI I HARGA SURVEI II
INDEK/1.21 BOYOLALI 2015
(Rp) (Rp) (Rp) (Rp) (Rp)
0.00
0.00
14,290.00 0 21,000 17,300
0.00 0 -
0.00 0 -
0.00 0 -
0.00 -
0.00 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 -
0.00 0 -
0.00 25200 -
0.00 35300 -
0.00 53800 -
27,270.00 0 40,000 33,000
0.00 0 -
0.00 -
0.00 -
19,750.00 29,000 23,900
28,670.00 42,000 34,700
0.00 -
0.00 0 -
39,580.00 0 58,000 47,900
49,170.00 42600 72,000 59,500
65,530.00 58300 96,000 79,300
0.00 0 -
41,650.00 -
0.00 -
0.00 50000 -
0.00 75000 -
0.00 800 -
0.00 20000 -
0.00 -
0.00 -
0.00 26280000 -
0.00 23968000 -
0.00 21400000 -
11,187,680.00 16,380,000 13,537,100
9,466,520.00 13,860,000 11,454,500
12,048,340.00 17,640,000 14,578,500
10,327,100.00 15,120,000 12,495,800
0.00 -
6,249,500.00 9800000 9,150,000 7,561,900
6,048,010.00 9072000 8,855,000 7,318,100
0.00 -
4,793,380.00 6498000 7,337,000 6,063,600 6,000,000.00
4,628,090.00 5936000 9,244,000 7,639,600 6,000,000.00
0.00 -
3,801,650.00 5600000 6,325,000 5,227,200
3,388,420.00 5152000 5,693,000 4,704,900
0.00 3304000 -
0.00 -
0.00 3696000 -
CK Boyolali
HARGA HARGA HARGA INDEX HARGA SURVEI I HARGA SURVEI II
INDEK/1.21 BOYOLALI 2015
(Rp) (Rp) (Rp) (Rp) (Rp)
0.00 -
0.00 -
0.00 40320 -
0.00 31360 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 -
0.00 0 -
0.00 0 -
0.00 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 -
0.00 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 -
34,130.00 50400 50,000 41,300 42,000.00 40,000.00
34,790.00 0 51,000 42,100 49,000.00 48,000.00
0.00 0 -
0.00 0 -
0.00 0 -
CK Boyolali
HARGA HARGA HARGA INDEX HARGA SURVEI I HARGA SURVEI II
INDEK/1.21 BOYOLALI 2015
(Rp) (Rp) (Rp) (Rp) (Rp)
0.00 0 -
0.00 -
129,750.00 0 190,000 157,000
0.00 0 -
80,990.00 107520 107,520 97,745
0.00 -
0.00 60480 -
0.00 50400 -
0.00 58240 -
0.00 68320 -
0.00 90720 -
0.00 78400 -
0.00 98560 -
0.00 49280 -
0.00 57120 -
0.00 62720 -
0.00 72800 -
0.00 107520 -
0.00 85120 -
0.00 924000 -
0.00 284480 -
0.00 470400 -
0.00 154560 -
81,900.00 143360 120,000 99,100
0.00 201600 -
0.00 61600 -
0.00 154560 -
0.00 -
0.00 175000 -
0.00 15000 -
0.00 23000 -
0.00 -
0.00 -
0.00 -
0.00 0 -
22,520.00 39200 33,000 27,200 50,000.00
34,790.00 56000 51,000 42,100 60,000.00
42,970.00 67200 63,000 52,000 65,000.00
64,170.00 75100 94,000 77,600 75,000.00
95,610.00 0 140,000 115,700 85,000.00
0.00 0 -
0.00 100800 -
189,830.00 134100 278,000 229,700
64,870.00 95,000 78,500 90,000.00
71,650.00 105,000 86,700 100,000.00
CK Boyolali
HARGA HARGA HARGA INDEX HARGA SURVEI I HARGA SURVEI II
INDEK/1.21 BOYOLALI 2015
(Rp) (Rp) (Rp) (Rp) (Rp)
CK Boyolali
HARGA HARGA HARGA INDEX HARGA SURVEI I HARGA SURVEI II
INDEK/1.21 BOYOLALI 2015
(Rp) (Rp) (Rp) (Rp) (Rp)
0.00 -
0.00 -
0.00 -
12,230.00 0 18,000 14,800
17,020.00 0 25,000 20,600
23,880.00 0 35,000 28,900
20,410.00 0 30,000 24,700
40,240.00 0 59,000 48,700
0.00 0 -
126,280.00 0 185,000 152,800
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
126,280.00 185,000 152,800 160000
40,240.00 59,000 48,700
20,410.00 30,000 24,700 29000
23,880.00 35,000 28,900 22000
17,020.00 25,000 20,600 20000
12,230.00 18,000 14,800 18000
0.00 -
0.00 -
73,710.00 0 108,000 89,200
90,080.00 0 132,000 109,000
135,200.00 0 198,000 163,600
237,680.00 0 348,000 287,600
299,090.00 0 438,000 361,900
0.00 0 -
467,100.00 0 684,000 565,200
458,920.00 0 672,000 555,300
1,040,900.00 0 1,524,000 1,259,500
0.00 0 -
0.00 0 -
0.00 -
0.00 -
0.00 0 -
0.00 0 -
0.00 0 -
5,450.00 9700 8,000 6,600
0.00 -
49,580.00 67968 76,000 62,800 59,000.00
0.00 84096 -
0.00 9000 -
0.00 80000 -
0.00 75000 -
0.00 75000 -
0.00 65000 -
0.00 65000 -
0.00 12.57142857 -
0.00 75000 -
0.00 68000 -
0.00 7200 -
0.00 15000 -
0.00 8500 -
CK Boyolali
HARGA HARGA HARGA INDEX HARGA SURVEI I HARGA SURVEI II
INDEK/1.21 BOYOLALI 2015
(Rp) (Rp) (Rp) (Rp) (Rp)
0.00 12500 -
0.00 -
13,420.00 -
18,590.00
0.00 -
0.00 0 -
0.00 -
0.00 -
0.00 -
0.00 0 -
66,110.00 0 -
43,630.00 0 64,000 52,800
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 -
43,630.00 50400 64,000 52,800 50,000.00
51,900.00 67200 76,000 62,800 60,000.00
0.00 84000 -
0.00 -
90,080.00 128800 132,000 109,000 100,000.00
114,710.00 168000 168,000 138,800 140,000.00
0.00 0 -
0.00 0 -
61,980.00 0 -
0.00 -
0.00 85200 -
0.00 34800 -
0.00 46000 -
14,290.00 15700 21,000 17,300 15,000.00
0.00 66100 -
43,630.00 -
0.00 -
0.00 -
23,880.00 33600 35,000 28,900 26,000.00
10,900.00 23600 16,000 13,200 29,000.00 28,000.00
4,710.00 9600 7,000 5,700
0.00 22400 -
51,900.00 0 76,000 62,800 45,000.00 50,000.00
0.00 0 -
0.00 0 -
6,110.00 0 9,000 7,400
0.00 58300 -
0.00 39200 -
0.00 18000 -
34,790.00 0 51,000 42,100
34,790.00 0 51,000 42,100
0.00 -
0.00 -
0.00 0 -
0.00 0 -
10,900.00 23600 16,000 13,200
0.00 80640 -
0.00 0 -
0.00 0 -
0.00 112500 -
CK Boyolali
HARGA HARGA HARGA INDEX HARGA SURVEI I HARGA SURVEI II
INDEK/1.21 BOYOLALI 2015
(Rp) (Rp) (Rp) (Rp) (Rp)
0.00 0 -
0.00 67200 -
0.00 67200 -
0.00 64960 -
13,220.00 21,000 17,300 19,000.00 18,000.00
0.00 -
0.00 -
22,520.00 33600 35,000 28,900 29,000.00
0.00 58300 -
41,320.00 0 76,000 62,800
0.00 23600 -
11,570.00 25200 17,000 14,000 10000 20000
0.00 0 -
244,620.00 0 360,000 297,500
0.00 -
0.00 0 -
0.00 0 -
12,970.00 0 19,000 15,700
0.00 -
0.00 -
47,100.00 0 70,000 57,800 55,000.00
64,460.00 60500 95,000 78,500 65,000.00
0.00 69500 -
0.00 106400 -
0.00 -
0.00 0 -
0.00 79600 -
0.00 -
0.00 0 -
73,550.00 68900 82,000 67,700 75,000.00
0.00 74500 -
0.00 117600 -
0.00 -
0.00 1200000 -
0.00 -
0.00 -
0.00 -
0.00 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 -
CK Boyolali
HARGA HARGA HARGA INDEX HARGA SURVEI I HARGA SURVEI II
INDEK/1.21 BOYOLALI 2015
(Rp) (Rp) (Rp) (Rp) (Rp)
0.00 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 -
0.00 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 -
0.00 -
0.00 0 -
0.00 0 -
40,900.00 0 60,000 49,500
108,590.00 0 159,000 131,400
0.00 0 -
40,900.00 67200 60,000 49,500 65,000.00
0.00 -
40,900.00 60,000 49,500
129,000.00 189,000 156,100
4,130.00 -
0.00 -
0.00 0 -
6,770.00 0 10,000 8,200 10,000.00 10,000.00
0.00 0 -
0.00 0 -
0.00 0 -
2,720.00 0 4,000 3,300 5000
1,980.00 0 3,000 2,400 5,000.00
0.00 0 -
0.00 -
0.00 -
794,950.00 2184000 1,164,000 961,900 600,000.00 650,000.00
103,800.00 129000 152,000 125,600 145,000.00 140,000.00
0.00 0 -
0.00 0 -
216,440.00 0 317,000 261,900 350,000.00
0.00 278000 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
CK Boyolali
HARGA HARGA HARGA INDEX HARGA SURVEI I HARGA SURVEI II
INDEK/1.21 BOYOLALI 2015
(Rp) (Rp) (Rp) (Rp) (Rp)
0.00 -
0.00 -
11,570.00 14600 17,000 14,000 12,000.00
0.00 0 -
14,950.00 0 22,000 18,100
0.00 0 -
0.00 0 -
0.00 0 -
12,970.00 0 19,000 15,700 13000 13000
1,650.00 2500 2,500 2,000
12,800.00 -
0.00 - 24
0.00 -
0.00 0 -
0.00 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 -
0.00 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 -
0.00 0 -
0.00 0 -
1,980.00 0 3,000 2,400
0.00 0 -
30,660.00 58240 45,000 37,100
40,900.00 91840 60,000 49,500
CK Boyolali
HARGA HARGA HARGA INDEX HARGA SURVEI I HARGA SURVEI II
INDEK/1.21 BOYOLALI 2015
(Rp) (Rp) (Rp) (Rp) (Rp)
0.00 69440 -
0.00 103040 -
30,660.00 45,000 37,100
40,900.00 60,000 49,500
49,580.00 68,000 56,100
66,110.00 80,000 66,100
53,710.00 77,000 63,600
71,070.00 90,000 74,300
0.00 -
0.00 -
0.00 1270 -
0.00 1460 -
0.00 1580 -
0.00 2180 -
0.00 2450 -
0.00 3320 -
0.00 2810 -
0.00 3840 -
0.00 4310 -
0.00 2170 -
0.00 2510 -
0.00 2720 -
0.00 3280 -
0.00 7310 -
0.00 1510 -
0.00 1730 -
0.00 1880 -
0.00 2450 -
0.00 2710 -
0.00 3640 -
0.00 3320 -
0.00 4310 -
0.00 4770 -
0.00 2590 -
0.00 2970 -
0.00 3220 -
0.00 4330 -
0.00 8340 -
0.00 26910 -
0.00 -
0.00 -
0.00 1860 -
0.00 2570 -
0.00 1690 -
0.00 2890 -
0.00 1250 -
0.00 2460 -
0.00 30360 -
0.00 36960 -
0.00 47520 -
0.00 52800 -
0.00 58080 -
0.00 55440 -
0.00 16050 -
0.00 23120 -
0.00 -
0.00 -
0.00 -
CK Boyolali
HARGA HARGA HARGA INDEX HARGA SURVEI I HARGA SURVEI II
INDEK/1.21 BOYOLALI 2015
(Rp) (Rp) (Rp) (Rp) (Rp)
0.00 0 -
0.00 0 -
67,760.00 0 82,000 67,700
75,200.00 0 91,000 75,200
235,530.00 0 285,000 235,500
366,110.00 0 443,000 366,100
0.00 0 -
60,740.00 0 72,000 59,500
64,870.00 0 78,000 64,400
0.00 -
0.00 0 -
5,160.00 -
0.00 -
0.00 0 -
0.00 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 -
0.00 0 -
0.00 -
0.00 0 -
0.00 0 -
0.00 -
11,570.00 6000 17,000 14,000
450,740.00 0 660,000 545,400
0.00 0 -
0.00 8580 -
22,470.00 0 33,000 27,200
0.00 0 -
59,910.00 80000 80,000 66,100
0.00 0 -
5,280.00 0 6,400 5,200
5,530.00 0 6,700 5,500
12,970.00 0 19,000 15,700
0.00 0 -
0.00 -
0.00 78500 -
0.00 71000 -
0.00 525000 -
0.00 -
0.00 -
60,740.00 85000 72,000 59,500
64,870.00 108000 78,000 64,400
0.00 102000 -
0.00 -
0.00 28000 -
0.00 25500 -
CK Boyolali
HARGA HARGA HARGA INDEX HARGA SURVEI I HARGA SURVEI II
INDEK/1.21 BOYOLALI 2015
(Rp) (Rp) (Rp) (Rp) (Rp)
0.00 75000 -
0.00 30000 -
0.00 35000 -
0.00 35000 -
0.00 600 -
0.00 6000 -
0.00 250000 -
0.00 25000 -
0.00 455000 -
0.00 55000 -
0.00 15000 -
0.00 1490000 -
0.00 637000 -
0.00 260000 -
0.00 -
-
CK Boyolali
INTERNET (Rp)
CK Boyolali
INTERNET (Rp)
40000 44000
46000 50600
52000 57200
60000 66000
68000 74800
76000 83600
CK Boyolali
DAFTAR HARGA SATUAN BAHAN BANGUNAN
PEKERJAAN : -
LOKASI : -
TAHUN ANGGARAN : -
I BAHAN DASAR
1 BATU KALI Bulat Utuh m3
Bulat Belah m3 230,000 190,000.00
Pecah 10/15 m3 230,000 190,000.00
Pecah 5/7 m3 242,000 200,000.00
Pecah 3/5 m3 242,000 200,000.00
2 KERIKIL Timbunan Pilihan m3 114,000
Sawur / Koral m3 102,000
Beton 0,5/1 m3 123,000
Beton 1/2 m3 260,000
Beton 2/3 m3 250,000
Biasa m3
Tras Giling m3
3 BATU BATA ex lokal bh 700
Concrete Blok (CB 15) / Batako (Lubang2) bh
Batako Padat bh
Rosteer beton cetak 12 x 11 x 24 cm bh
Rosteer tanah liat bakar 12 x 11 x 24 cm bh
II B A H A N P E N U T U P A T A P
1 SIRAP (100 lbr) pak
Sirap asbes semen m2
2 GENTENG BETON
Genteng Beton Warna standard bh
Genteng Beton Warna Special bh
Genteng Beton Warna Khusus bh
Kerpus Beton Warna Standard bh 6,000
Kerpus Beton Warna Special bh
Kerpus Beton Warna Khusus bh
Genteng beton ex. Mutiara bh
CK Boyolali
HARGA HARGA
NO. J E N I S B A H A N SATUAN
(Rp) KESEPAKATAN
4 GENTENG KACA
Vlaam tebal 2 mm bh
Vlaam tebal 3 mm bh
Kodok tebal 2 mm bh
Kodok tebal 3 mm bh
CK Boyolali
HARGA HARGA
NO. J E N I S B A H A N SATUAN
(Rp) KESEPAKATAN
6 ASBES PLAT
. 100cm X 100 cm X 3 mm bh 21,000
. 100cm X 100 cm X 4 mm bh
. 50 cm X 200 cm X 3 mm bh
. 40 cm X 200 cm X 3 mm bh
10 ASPAL BITUMEN
Atap Onduvila lbr
Nok Onduvila lbr
Skrup pcs
Lisplank GRC 2/20 m'
III B A H A N K A Y U
1 JATI Papan m3
Balok/pesagen m3
Reng m3
Balok kelas II m3 16,380,000
Balok kelas III m3 13,860,000
Papan kelas II m3 17,640,000
Papan kelas III m3 15,120,000
CK Boyolali
HARGA HARGA
NO. J E N I S B A H A N SATUAN
(Rp) KESEPAKATAN
4 UBIN PORSELIN
Lokal 11 X 11 putih dos
11 X 11 warna dos
Lokal 15 X 15 putih dos
15 X 15 warna dos
5 MOZAIK PORSELIN
10 X 20 cm m2
15 X 15 cm m2
20 X 20 cm m2
20 X 25 cm m2
8 Batu Paras m2
CK Boyolali
HARGA HARGA
NO. J E N I S B A H A N SATUAN
(Rp) KESEPAKATAN
10 GRANITO 40 x 40 cm m2 190,000
30 x 30 cm m2
11 Marmer m2 107,520
V.BAHAN CETAK
1 BUIS BETON Ø 10 cm - 100 cm bh
Ø 20 cm - 100 cm bh 33,000
Ø 30 cm - 100 cm bh 51,000
Ø 40 cm - 100 cm bh 63,000
Ø 50 cm - 100 cm bh 94,000
Ø 60 cm - 100 cm bh 140,000
Ø 70 cm - 100 cm bh
Ø 80 cm - 100 cm bh
Ø 100 cm - 100 cm bh 278,000
Ø 80 cm - 50 cm bh 95,000
Ø 90 cm - 50 cm bh 105,000
Ø 100 cm - 50 cm bh 139,000
U 10 cm - 100 cm bh
U 15 cm - 100 cm bh
U 20 cm - 100 cm bh 45,000
U 30 cm - 100 cm bh 57,000
U 50 cm - 100 cm bh
CK Boyolali
HARGA HARGA
NO. J E N I S B A H A N SATUAN
(Rp) KESEPAKATAN
VI B A H A N B E S I
1 BESI BETON besi beton polos kg 11,000
besi beton prestress kg
besi beton ulir kg 11,000
7 LAIN-LAIN
Paku asbes kg 28,000
Paku sekrup asbes bh 22,000
Paku crampon bh
Dynabolt ukuran 8 mm x 65 mm bh
Baut gording kg
Hollow Galvanis 2.4. 400 bt
Hollow Galvanis 4.4. 400 bt
Baja Ringan C.75 ex. Taso bt
VII B A H A N P I P A
1 Pipa PVC SII SCJ , S - 12,5 (10 bar)
Pipa PVC DN 20 ( ½" ) AW JIS btg 18,000
Pipa PVC DN 25 ( ¾" ) AW JIS btg 25,000
Pipa PVC DN 32 ( 1" ) AW JIS btg 35,000
Pipa PVC DN 40 ( 1½" ) btg 30,000
Pipa PVC DN 63 ( 2" ) btg 59,000
Pipa PVC DN 90 ( 3" ) btg
Pipa PVC DN 110 ( 4" ) btg 185,000
Pipa PVC DN 160 ( 6" ) btg
Pipa PVC DN 200 ( 8" ) btg
Pipa PVC DN 250 ( 10" ) btg
Pipa PVC DN 315 ( 12" ) btg
CK Boyolali
HARGA HARGA
NO. J E N I S B A H A N SATUAN
(Rp) KESEPAKATAN
VIII B A H A N L A N G I T - L A N G I T
1 AKUSTIK-uk : 30 X 30 lbr
30 X 60 lbr
60 X 120 lbr
List Kayu Profil m' 8,000
2 SOFT BOARD-uk: 4'X 8' (1,2 x2,4 m2)
Gypsum tebal 9 mm lbr 76,000
Gypsum tebal 12 mm lbr
List Gypsum m'
Gypsum tebal 9 mm (120 x 240) lbr
lbr
lbr
lbr
lbr
Sekrup Gypsum bh
Compound zak
GRC Board lbr
Dinabolt Bh
Cotton Plaster bh
List Gypsum m'
Tepung Gypsum kg
4 PLY WOOD
Teak wood
90 X 210 X 3 mm lbr
. 120 X 240 X 3 mm lbr
. 90 X 210 X 4 mm lbr 64,000
. 90 X 210 X 9 mm lbr
. 90 X 210 X 12 mm lbr
. 90 X 210 X 15 mm lbr
. 90 X 210 X 18 mm lbr
Tripleks
. 120 X 240 X 3 mm lbr 64,000
. 120 X 240 X 4 mm lbr 76,000
CK Boyolali
HARGA HARGA
NO. J E N I S B A H A N SATUAN
(Rp) KESEPAKATAN
IX B A H A N F I N I S H I N G
1 KAYU
Menie kg 35,000
Dempul plamur kg 16,000
Ambril/amplas lbr 7,000
Batu Apung kg
Cat dasar kg 76,000
. Emco kg
. Yunior 66 (nippon paint) kg
- Koas bh 9,000
. Deculux kg
. Siralax ons
. Spiritus ltr
. Plitur jadi ltr 51,000
. Vernis ltr 51,000
2 TEMBOK
Kalkarium kg
Kapur sirih kg
Plamur kg 16,000
Cat Tembok ex. Nippon Weatherbond kg
Sintex 5 kg
Danabride 5 kg
Catylac 5 kg
Mowilex 5 kg
Alkali Tembok ex. Nippon 3-in 1 Anti-Alkali Primer Sealer kg
MOWILEX PRECOAT VARNISH BATU ALAM lt
Mowilex Clear Coating lt
Cat tembok kg 21,000
3 BESI
Menie kg 35,000
Cat mengkilat kg
Cat kg 76,000
Thinner A ltr
Minyak cat ltr 17,000
Thinner Super ltr
Residu (teer/aspal) drum 360,000
Fibre glass (tanki air)
kapasitas 550 liter. bh
kapasitas 1100 liter. bh
Lem Aica Aibon kg 19,000
X BAHAN KACA
CK Boyolali
HARGA HARGA
NO. J E N I S B A H A N SATUAN
(Rp) KESEPAKATAN
1 POLOS 3 mm m2 70,000
5 mm m2 95,000
8 mm m2
12 mm m2
2 ES KABUR 3 mm m2
5 mm m2
3 RAY BAND 3 mm m2
5 mm m2 82,000
8 mm m2
12 mm m2
4 TEMPERED 12 mm m2
2 SKAKELAR
Out bauw . Seri bh
Engkel bh
In bauw . Seri bh
Engkel bh
4 STEKER - Biasa bh
Arde bh
T Biasa bh
T dengan Arde bh
5 FITING Flaon bh
Gantung bh
Kap bh
Kombinasi bh
CK Boyolali
HARGA HARGA
NO. J E N I S B A H A N SATUAN
(Rp) KESEPAKATAN
XIII
BAHAN SANITAIR
1KLOSET DUDUK bh 1,164,000
2KLOSET JONGKOK bh 152,000
3WASTAFEL PEDESTAL bh
4WASTAFEL MEJA OVAL bh
5WASTAFEL GANTUNG BULAT bh 317,000
6WASTAFEL GANTUNG SUDUT bh
7WASTAFEL GANTUNG SUDUT KECIL bh
8WASTAFEL BAK CUCI bh
9TEMPAT SABUN GANTUNG bh
10TEMPAT SABUN TANAM bh
URINOIR KERAMIK STANDART bh 1,393,000
BAK MANDI FIBRE GLASS 70.70.80 bh 317,000
11 SEPTIC TANK (ETERNIT GRESIK)
5 Pemakai 500 liter unit
10 Pemakai 1.000 liter unit
12 LAIN - LAIN
Kran Air 1/2" bh
Kran Air 3/4" bh 24,000
Seal tape bh 4,000
Floor drain bh 4,000
Roof drain kuningan bh
CK Boyolali
HARGA HARGA
NO. J E N I S B A H A N SATUAN
(Rp) KESEPAKATAN
XV POMPA AIR
1 POMPA AIR TANGAN
Dragon buatan Indonesia bh
2 POMPA AIR LISTRIK
Sanyo 100 watt bh
Fuji 250 watt bh
Shimizu . 100 watt bh
. 90 watt bh
Dab . 125 watt bh
. 175 watt bh
CK Boyolali
HARGA HARGA
NO. J E N I S B A H A N SATUAN
(Rp) KESEPAKATAN
8 ASPAL.
Aspal Ex Pertamina isi Net 160 kg drum
Hotmix Tebal = 4 Cm m2
Hotmix Tebal = 5 Cm m2
Hotmix Tebal = 6 Cm m2
Hotmix Tebal = 7 Cm m2
Binder Course ton
Wearing Course ton
Hot Roller Sheet ton
CK Boyolali
HARGA HARGA
NO. J E N I S B A H A N SATUAN
(Rp) KESEPAKATAN
13 WATER PROOFING 5 kg
5 kg
20 Ltr
CK Boyolali
HARGA HARGA HARGA INDEX HARGA SURVEI I HARGA SURVEI II
INDEK/1.21 BOYOLALI 2015 INTERNET (Rp)
(Rp) (Rp)
(Rp) (Rp) (Rp)
REAL
0.00
0.00 229,000.00
190,080.00 239,000.00 159,000
190,080.00 260,000.00 142,000
200,000.00 135,000.00
200,000.00 200,000.00 240,000
94,210.00 110,000.00 114,000
84,290.00 0.00 102,000
101,650.00 240,000.00 123,000
214,870.00 230,000.00 260,000
206,610.00 215,000.00 250,000
0.00 0.00
0.00 0.00
570.00 760 700 530.00
0.00 3400
0.00 3920
0.00 3700
0.00 3700
0.00
84,290.00 125000 102,000
131,400.00 210000 159,000
131,400.00 224000 159,000
42,970.00 72000 52,000
0.00 0
0.00 112000
198,340.00 275000 240,000
0.00 0
0.00
51,230.00 63200 62,000
51,230.00 0 62,000
0.00 0
0.00 0
0.00 0
1,340.00 1580 1,625
0.00 112000
0.00 140000
11,150.00 13500 13,500
0.00
0.00
0.00 728000
0.00 42790
0.00
0.00
0.00 0
0.00 0
0.00 0
4,950.00 0 6,000
0.00 0
0.00 0
0.00 6280
CK Boyolali
HARGA HARGA HARGA INDEX HARGA SURVEI I HARGA SURVEI II
INDEK/1.21 BOYOLALI 2015 INTERNET (Rp)
(Rp) (Rp) (Rp) (Rp) (Rp)
0.00 6720
2,470.00 3,000
0.00
0.00
330.00 0 400
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
2,470.00 0 3,000
4,950.00 6,000
5,780.00 7,000
5,780.00 7,000
0.00 1250
0.00 2250
0.00 3600
0.00 2580
0.00 10640
0.00 9860
0.00 4480
0.00 7280
0.00 25200
1,810.00 2,200
1,730.00 2,100
1,480.00 1,800
1,400.00 1,700
0.00
0.00
0.00 0
0.00 0
0.00 0
0.00 0
0.00
0.00
0.00 79300
0.00 0
0.00 105800
0.00 0
0.00 0
0.00 0
0.00 0
36,360.00 0 44,000 40000
41,810.00 53800 50,600 46000
47,270.00 0 57,200 52000
54,540.00 72800 66,000 60000
61,810.00 0 74,800 68000
85,120.00 0 103,000 132000 110000 76000
0.00
0.00
0.00 0
0.00 0
0.00 0
0.00
31,400.00 0 38,000
0.00 0
0.00 0
0.00
CK Boyolali
HARGA HARGA HARGA INDEX HARGA SURVEI I HARGA SURVEI II
INDEK/1.21 BOYOLALI 2015 INTERNET (Rp)
(Rp) (Rp) (Rp) (Rp) (Rp)
0.00
17,350.00 0 21,000
0.00 0
0.00 0
0.00 0
0.00
0.00
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00
0.00 0
0.00 25200
0.00 35300
0.00 53800
33,050.00 0 40,000
0.00 0
0.00
0.00
23,960.00 29,000
34,710.00 42,000
0.00
0.00 0
47,930.00 0 58,000
59,500.00 42600 72,000
79,330.00 58300 96,000
0.00 0
0.00
0.00
0.00 50000
0.00 75000
0.00 800
0.00 20000
0.00
0.00
0.00 26280000
0.00 23968000
0.00 21400000
13,537,190.00 16,380,000
11,454,540.00 13,860,000
14,578,510.00 17,640,000
12,495,860.00 15,120,000
0.00
7,561,980.00 9800000 9,150,000
7,318,180.00 9072000 8,855,000
0.00
6,063,630.00 6498000 7,337,000 6,000,000.00
7,639,660.00 5936000 9,244,000 6,000,000.00
0.00
5,227,270.00 5600000 6,325,000
4,704,950.00 5152000 5,693,000
0.00 3304000
0.00
0.00 3696000
2,090,900.00 3136000 2,530,000
CK Boyolali
HARGA HARGA HARGA INDEX HARGA SURVEI I HARGA SURVEI II
INDEK/1.21 BOYOLALI 2015 INTERNET (Rp)
(Rp) (Rp) (Rp) (Rp) (Rp)
0.00
9,789,250.00 12880000 11,845,000 9,500,000.00
9,028,920.00 11760000 10,925,000 9,500,000.00
0.00
3,136,360.00 3696000 3,795,000
2,614,040.00 3136000 3,163,000
0.00
16,520.00 20000 20,000
0.00 16000
0.00 25000
0.00 0
0.00 812000
13,220.00 14200 16,000
0.00 33750
0.00 9700
0.00 26900
0.00
0.00
0.00
0.00 40320
0.00 31360
0.00 0
0.00 0
0.00 0
0.00
0.00 0
0.00 0
0.00
0.00 0
0.00 0
0.00 0
0.00
0.00
0.00 0
0.00 0
0.00 0
0.00 0
0.00
0.00 0
0.00 0
0.00 0
0.00 0
0.00
41,320.00 50400 50,000 42,000.00 40,000.00
42,140.00 0 51,000 49,000.00 48,000.00
0.00 0
0.00 0
0.00 0
38,010.00 46,000 55000
42,140.00 51,000 45,000.00 43000
52,890.00 64,000 47,000.00 45000
44,620.00 54,000 49,000.00 48000
44,620.00 54,000 49,000.00 49000
0.00 0
0.00
0.00 0
0.00
0.00 0
CK Boyolali
HARGA HARGA HARGA INDEX HARGA SURVEI I HARGA SURVEI II
INDEK/1.21 BOYOLALI 2015 INTERNET (Rp)
(Rp) (Rp) (Rp) (Rp) (Rp)
0.00
157,020.00 0 190,000
0.00 0
88,850.00 107520 107,520
0.00
0.00 60480
0.00 50400
0.00 58240
0.00 68320
0.00 90720
0.00 78400
0.00 98560
0.00 49280
0.00 57120
0.00 62720
0.00 72800
0.00 107520
0.00 85120
0.00 924000
0.00 284480
0.00 470400
0.00 154560
99,170.00 143360 120,000
0.00 201600
0.00 61600
0.00 154560
0.00
0.00 175000
0.00 15000
0.00 23000
0.00
0.00
0.00
0.00 0
27,270.00 39200 33,000 50,000.00
42,140.00 56000 51,000 60,000.00
52,060.00 67200 63,000 65,000.00
77,680.00 75100 94,000 75,000.00
115,700.00 0 140,000 85,000.00
0.00 0
0.00 100800
229,750.00 134100 278,000
78,510.00 95,000 90,000.00
86,770.00 105,000 100,000.00
114,870.00 139,000
0.00 0
0.00 0
37,190.00 37000 45,000 27,500.00
47,100.00 42600 57,000 35,000.00
0.00 0
0.00
0.00
4,950.00 0 6,000
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
CK Boyolali
HARGA HARGA HARGA INDEX HARGA SURVEI I HARGA SURVEI II
INDEK/1.21 BOYOLALI 2015 INTERNET (Rp)
(Rp) (Rp) (Rp) (Rp) (Rp)
0.00
0.00
9,090.00 10650 11,000 9,500.00
0.00 0
9,090.00 10650 11,000 9,500.00
0.00
4,130.00 10650 5,000
0.00
11,570.00 12900 14,000
14,870.00 18,000
0.00
0.00 0
0.00 0
0.00 616000
0.00 0
0.00 0
0.00 0
0.00 0
11,570.00 13900 14,000
0.00
15,700.00 16800 19,000 14,000.00
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 17250
0.00 16000
26,440.00 32,000
0.00
0.00
23,140.00 23600 28,000 20,000.00 15,000.00
18,180.00 650 22,000 35000
0.00 1750
0.00 1600
0.00 12600
0.00 21300
0.00 28000
0.00 75000
0.00
0.00
0.00
0.00
14,870.00 0 18,000
20,660.00 0 25,000
28,920.00 0 35,000
24,790.00 0 30,000
48,760.00 0 59,000
0.00 0
152,890.00 0 185,000
0.00 0
0.00 0
0.00 0
0.00 0
CK Boyolali
HARGA HARGA HARGA INDEX HARGA SURVEI I HARGA SURVEI II
INDEK/1.21 BOYOLALI 2015 INTERNET (Rp)
(Rp) (Rp) (Rp) (Rp) (Rp)
CK Boyolali
HARGA HARGA HARGA INDEX HARGA SURVEI I HARGA SURVEI II
INDEK/1.21 BOYOLALI 2015 INTERNET (Rp)
(Rp) (Rp) (Rp) (Rp) (Rp)
0.00 84000
0.00
109,090.00 128800 132,000 100,000.00
138,840.00 168000 168,000 140,000.00
0.00 0
0.00 0
0.00 0
0.00
0.00 85200
0.00 34800
0.00 46000
17,350.00 15700 21,000 15,000.00
0.00 66100
0.00
0.00
0.00
28,920.00 33600 35,000 26,000.00
13,220.00 23600 16,000 29,000.00 28,000.00
5,780.00 9600 7,000
0.00 22400
62,800.00 0 76,000 45,000.00 50,000.00
0.00 0
0.00 0
7,430.00 0 9,000
0.00 58300
0.00 39200
0.00 18000
42,140.00 0 51,000
42,140.00 0 51,000
0.00
0.00
0.00 0
0.00 0
13,220.00 23600 16,000
0.00 80640
0.00 0
0.00 0
0.00 112500
0.00 0
0.00 67200
0.00 67200
0.00 64960
17,350.00 21,000 19,000.00 18,000.00
0.00
0.00
28,920.00 33600 35,000 29,000.00
0.00 58300
62,800.00 0 76,000
0.00 23600
14,040.00 25200 17,000 10000 20000
0.00 0
297,520.00 0 360,000
0.00
0.00 0
0.00 0
15,700.00 0 19,000
0.00
0.00
CK Boyolali
HARGA HARGA HARGA INDEX HARGA SURVEI I HARGA SURVEI II
INDEK/1.21 BOYOLALI 2015 INTERNET (Rp)
(Rp) (Rp) (Rp) (Rp) (Rp)
CK Boyolali
HARGA HARGA HARGA INDEX HARGA SURVEI I HARGA SURVEI II
INDEK/1.21 BOYOLALI 2015 INTERNET (Rp)
(Rp) (Rp) (Rp) (Rp) (Rp)
0.00
0.00 0
0.00 0
0.00 0
0.00 0
0.00
0.00
0.00 0
0.00 0
49,580.00 0 60,000
131,400.00 0 159,000
0.00 0
49,580.00 67200 60,000 65,000.00
0.00
49,580.00 60,000
156,190.00 189,000
0.00
0.00
0.00 0
8,260.00 0 10,000 10,000.00 10,000.00
0.00 0
0.00 0
0.00 0
3,300.00 0 4,000 5000
2,470.00 0 3,000 5,000.00
0.00 0
0.00
0.00
961,980.00 2184000 1,164,000 600,000.00 650,000.00
125,610.00 129000 152,000 145,000.00 140,000.00
0.00 0
0.00 0
261,980.00 0 317,000 350,000.00
0.00 278000
0.00 0
0.00 0
0.00 0
0.00 0
1,151,230.00 1,393,000
261,980.00 317,000
0.00
0.00 0
0.00 0
0.00
0.00 17000
19,830.00 29500 24,000 15,000.00 15,000.00
3,300.00 3400 4,000
3,300.00 56000 4,000
0.00 79000
0.00
0.00
14,040.00 14600 17,000 12,000.00
0.00 0
18,180.00 0 22,000
0.00 0
0.00 0
0.00 0
15,700.00 0 19,000 13000 13000
CK Boyolali
HARGA HARGA HARGA INDEX HARGA SURVEI I HARGA SURVEI II
INDEK/1.21 BOYOLALI 2015 INTERNET (Rp)
(Rp) (Rp) (Rp) (Rp) (Rp)
CK Boyolali
HARGA HARGA HARGA INDEX HARGA SURVEI I HARGA SURVEI II
INDEK/1.21 BOYOLALI 2015 INTERNET (Rp)
(Rp) (Rp) (Rp) (Rp) (Rp)
0.00 3280
0.00 7310
0.00 1510
0.00 1730
0.00 1880
0.00 2450
0.00 2710
0.00 3640
0.00 3320
0.00 4310
0.00 4770
0.00 2590
0.00 2970
0.00 3220
0.00 4330
0.00 8340
0.00 26910
0.00
0.00
0.00 1860
0.00 2570
0.00 1690
0.00 2890
0.00 1250
0.00 2460
0.00 30360
0.00 36960
0.00 47520
0.00 52800
0.00 58080
0.00 55440
0.00 16050
0.00 23120
0.00
0.00
0.00
0.00 0
0.00 0
67,760.00 0 82,000
75,200.00 0 91,000
235,530.00 0 285,000
366,110.00 0 443,000
0.00 0
59,500.00 0 72,000
64,460.00 0 78,000
0.00
0.00 0
0.00
0.00
0.00 0
0.00
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
CK Boyolali
HARGA HARGA HARGA INDEX HARGA SURVEI I HARGA SURVEI II
INDEK/1.21 BOYOLALI 2015 INTERNET (Rp)
(Rp) (Rp) (Rp) (Rp) (Rp)
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00
0.00 0
0.00
0.00 0
0.00 0
0.00
14,040.00 6000 17,000
545,450.00 0 660,000
0.00 0
0.00 8580
27,270.00 0 33,000
0.00 0
66,110.00 80000 80,000
0.00 0
5,280.00 0 6,400
5,530.00 0 6,700
15,700.00 0 19,000
0.00 0
0.00
0.00 78500
0.00 71000
0.00 525000
0.00
0.00
59,500.00 85000 72,000
64,460.00 108000 78,000
0.00 102000
0.00
0.00 28000
0.00 25500
0.00 75000
0.00 30000
0.00 35000
0.00 35000
0.00 600
0.00 6000
0.00 250000
0.00 25000
0.00 455000
0.00 55000
0.00 15000
0.00 1490000
0.00 637000
0.00 260000
0.00
CK Boyolali
INTERNET (Rp)
PLUS PPN
CK Boyolali
INTERNET (Rp)
44000
50600
57200
66000
74800
83600
CK Boyolali
DAFTAR SEWA PERALATAN
PEKERJAAN :
LOKASI :
TAHUN ANGGARAN :
CK Boyolali
DAFTAR UPAH PEKERJA
0
1 Pekerja Hr 0.00
2 Mandor Hr 0.00
3 Tukang listrik Hr 0.00
4 Tukang kayu Hr 0.00
5 Kep. tk. kayu Hr 0.00
6 Tukang batu Hr 0.00
7 Kep. tk. batu Hr 0.00
8 Tukang besi Hr 0.00
9 Kep. tk. besi Hr 0.00
10 Tukang cat Hr 0.00
11 Kep. tk. cat Hr 0.00
12 Tukang plitur Hr 0.00
13 Tukang jalan Hr 0.00
14 Tukang gali Hr 0.00
DAFTAR HARGA SATUAN BAHAN BANGUNAN
0
I BAHAN DASAR
1 BATU KALI Bulat Belah m3 -
Pecah 10/15 m3 -
Pecah 5/7 m3 -
Pecah 3/5 m3 -
2 KERIKIL -
Sawur / Koral m3 -
Beton 0,5/1 m3 -
Beton 1/2 m3 -
Beton 2/3 m3 -
3 BATA MERAH bh -
4 PASIR Urug m3 -
Pasang m3 -
Beton m3 -
5 TANAH Biasa m3 -
6 PORTLAND CEMENT -
Portland Cement kg -
Semen Warna kg -
II BAHAN KAYU -
1 KAYU TAHUN/TERENTANG BEKISTING Papan m3 -
Balok/pesagen m3 -
2 Kayu Kelas II Papan m3 -
Balok/pesagen m3 -
-
3 DOLKEN/GALAM Sedang 8 - 10 x 400 cm bt -
-
4 LAIN -LAIN Bambu bt -
IV BAHAN PENUTUP DINDING / LANTAI -
1 Keramik 30 X 30 cm polos m2 -
40 X 40 cm polos m2 -
20 X 20 cm KM/WC m2 -
Keramik dinding 20/25 m2 -
-
-
VI BAHAN BESI besi beton polos kg -
1 BESI BETON besi beton ulir kg -
2 KAWAT - Ikat beton/bendrat kg -
3 Besi Hollow tebal 4x4x0.2 btg -
VII BAHAN PIPA -
1 Pipa PVC ( ½" ) AW SNI/4 m btg -
2 Pipa PVC ( ¾" ) AW SNI/4 m btg -
3 Pipa PVC ( 1" ) AW SNI/4 m btg -
4 Pipa PVC ( 2" ) AW SNI/4 m btg -
5 Pipa PVC ( 3" ) D SNI / 4 m btg -
6 Pipa PVC ( 4" ) D SNI/4 m btg -
VIII BAHAN LANGIT - LANGIT -
1 Polywood 120x240 X 6 mm lbr -
2 GRC lbr -
3 List Gpypsum m1 -
IX BAHAN FINISHING -
1 TEMBOK -
Plamur kg -
Cat tembok kg -
XI ALAT - ALAT PENGUNCI & PENGGANTUNG -
1 ENGSEL DAN GERENDEL -
Kupu-kupu biasa bh -
Grendel biasa bh -
Handle Pintu biasa bh -
XII BAHAN SANITAIR -
1 Kloset Jongkok bh -
2 LAIN - LAIN -
Kran Air 1/2" bh -
Kran Air 3/4" bh -
Seal tape bh -
Floor Drain bh -
XIII ALAT PENGIKAT KAYU -
1 PAKU - ukuran 1" s/d 4" kg -
XV L A I N - L A I N -
1 Minyak Beton & bekisting ltr -
2 Air m3 -
3 Lem Kayu kg -
4 Genteng Metal bh -
5 Tutup Manhole Cor Beton Rangka Besi Siku bh -
6 Tandon Air 1000 liter bh -
7 Rooster 25x25 bh -
DAFTAR HARGA SATUAN PEKERJAAN GEDUNG
HARGA
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN BAHAN/UPAH JUMLAH
Rp Rp
I HARGA SATUAN PEKERJAAN PERSIAPAN
IV HARGA SATUAN PEKERJAAN PASANGAN DINDING DAN PENUTUP LANTAI DAN DINDING
16 A.4.4.1.3 1 m2 Pemasangan Dinding Bata Merah Tebal 1 Bata Camp. 1SP : 4PP -
A Tenaga -
L.01 0.6 OH Pekerja - -
L.02 0.2 OH Tukang Batu - -
L.03 0.02 OH Kepala Tukang - -
L.04 0.03 OH Mandor - -
B Bahan -
140 Kg Semen portland - -
26.55 m3 Pasir beton - -
0.093 m3 Kerikil - -
C PERALATAN
D Jumlah A + B + C -
E Overhead & Profit 10% -
F Harga Satuan Pekerjaan (D+E) -
17 A.4.4.1.9 1 m2 Pemasangan Dinding Bata Merah Tebal 1/2 Bata Camp. 1SP : 4PP -
A Tenaga -
L.01 0.30 OH Pekerja - -
L.02 0.1 OH Tukang Batu - -
L.03 0.01 OH Kepala Tukang - -
L.04 0.015 OH Mandor - -
B Bahan -
70 Buah Bata Merah 5 x 11 x 22 - -
11.50 Kg Portland Semen - -
0.043 m3 Pasir Pasang - -
C PERALATAN
D Jumlah A + B + C -
E Overhead & Profit 10% -
F Harga Satuan Pekerjaan (D+E) -
18 A.4.4.1.22 1 m2 Pemasangan Dinding Terawang (Rooster) Uk, (12x11x24)cm Camp. 1SP : 3PP -
A Tenaga -
L.01 0.30 OH Pekerja - -
L.02 0.1 OH Tukang Batu - -
L.03 0.01 OH Kepala Tukang - -
L.04 0.015 OH Mandor - -
B Bahan -
16 Buah Terawang / Roster - -
11 kg Portland Semen - -
0.035 m3 Pasir Pasang - -
C PERALATAN
D Jumlah A + B + C -
E Overhead & Profit 10% -
F Harga Satuan Pekerjaan (D+E) -
19 A.4.4.2.15 1 m2 Pemasangan Plesteran 1 Pc : 4 Pp Tebal 20 mm -
A Tenaga -
L.01 0.40 OH Pekerja - -
L.02 0.20 OH Tukang batu - -
L.03 0.020 OH Kepala Tukang - -
L.04 0.022 OH Mandor - -
B Bahan -
8.320 kg Portland Cement - -
0.032 m3 Pasir Pasang - -
C PERALATAN
D Jumlah A + B + C -
E Overhead & Profit 10% -
F Harga Satuan Pekerjaan (D+E) -
25 A.4.6.1.2 1 m3 Pembuatan & Pemasangan Kosen Pintu & Jendela Kayu Kelas II -
Tenaga -
L.01 6.00 OH Pekerja - -
L.02 18.00 OH Tukang Kayu - -
L.03 1.80 OH Kepala Tukang - -
L.04 0.30 OH Mandor - -
Bahan -
1.2 m3 Kayu Kelas II, Balok - -
1.25 kg Paku Biasa 2" - 5 " - -
1 kg Lem Kayu - -
C PERALATAN
D Jumlah A + B + C -
E Overhead & Profit 0.10 -
F Harga Satuan Pekerjaan (D+E) -
C PERALATAN
D Jumlah A + B + C -
E Overhead & Profit 10% -
F Harga Satuan Pekerjaan (D+E) -
VII HARGA SATUAN PEKERJAAN RANGKA DAN PENUTUP ATAP
TOTAL HARGA
NO URAIAN PEKERJAAN
( Rp )
1 SMAN 2 ATAMBUA, Jl. Santa Kruz. RT 01 R 01. Ds. Tukuneno, Kec. Tasifeto Barat, Kab. Belu, NTT
A. PEKERJAAN IPAL 1 142,083,459.10
B. PEKERJAAN MCK 96,038,323.74
Jumlah 1: 238,121,782.84
2 SDK NELA, Ds. Naekasa RT 01 RW 01, Kec. Tasifeto Barat, Kab. Belu, NTT
A. PEKERJAAN IPAL 2 142,083,459.10
B. PEKERJAAN MCK 96,038,323.74
Jumlah 2: 238,121,782.84
3 SDK BUITASIK, Jl. Raya Kimbena RT 01 RW 01, Ds. Bakustulama, Kec. Tasifeto Barat, Kab. Belu, NTT
A. PEKERJAAN IPAL 3 142,083,459.10
B. PEKERJAAN MCK 96,038,323.74
Jumlah 3: 238,121,782.84
JUMLAH 1 + 2 + 3 714,365,348.51
PPN 10% 71,436,534.85
JUMLAH TOTAL 785,801,883.36
DIBULATKAN 785,801,000.00
Terbilang:
"Tujuh Ratus Sembilan Puluh Sembilan Juta Sembilan Ratus Sembilan Puluh Satu Ribu Rupiah"
MARDLIAN SHAH,ST
HARGA PERKIRAAN SENDIRI (HPS)
RK3K
Pekerjaan : DED Instalasi Pengolahan Limbah Domestik di Kabupaten Belu
Lokasi : Kec. Tasifeto Barat, Kabupaten Belu, Nusa Tenggara Timur
Tahun Anggaran : 2019
HARGA SATUAN TOTAL HARGA
NO URAIAN PEKERJAAN SATUAN
( Rp ) ( Rp )
1 Penyiapan RK3K
a. Pembuatan Instrusi Kerja 1 set 75,000.00 75,000.00
b. Pembuatan Kartu Identitas Pekerja 15 org 75,000.00 1,125,000.00
2 Sosialisasi dan Promosi K3
a. Poster/Banner 2 bh 150,000.00 300,000.00
3 Alat Perlindungan Kerja
a. Pembatas Area 1 Ls 75,000.00 75,000.00
4 Alat Perlindungan Diri
a. Topi Pelindung 15 bh 25,000.00 375,000.00
b. Masker 35 bh 7,500.00 262,500.00
c. Sarung Tangan 15 bh 5,000.00 75,000.00
5 Asuransi dan Perijinan
a. Surat ijin Kelayakan Alat 1 Alat 100,000.00 100,000.00
b. Surat ijin Operator 1 Alat 100,000.00 100,000.00
c. Surat ijin Pengesahan Panitia Pembina K3 1 LS 50,000.00 50,000.00
6 Personel K3
a. Petugas K3 1 OB 8,000,000.00 8,000,000.00
b. Safty Man/Pengatur Lalulintas 1 OB 6,500,000.00 6,500,000.00
7 Fasilitas Sarana Kesehatan
a. Peralatan P3K 1 Ls 7,557,500.00 7,557,500.00
8 Rambu-rambu
a. Rambu Peringatan 1 bh 25,000.00 25,000.00
b. Rambu Petunjuk 1 bh 30,000.00 30,000.00
c. Rambu Larangan 1 bh 20,000.00 20,000.00
9 Lain-Lain
a. Bendera K3 2 bh 50,000.00 100,000.00
b. Lampu Darurat 2 bh 65,000.00 130,000.00
c. Pelaporan 1 Ls 100,000.00 100,000.00
Jumlah I: 25,000,000.00
II SDK NELA, Ds. Naekasa RT 01 RW 01, Kec. Tasifeto Barat, Kab. Belu, NTT
HARGA SATUAN TOTAL HARGA
NO URAIAN PEKERJAAN SATUAN
( Rp ) ( Rp )
1 Penyiapan RK3K
a. Pembuatan Instrusi Kerja 1 set 75,000.00 75,000.00
b. Pembuatan Kartu Identitas Pekerja 10 org 75,000.00 750,000.00
2 Sosialisasi dan Promosi K3
a. Poster/Banner 2 bh 150,000.00 300,000.00
3 Alat Perlindungan Kerja
a. Pembatas Area 1 Ls 75,000.00 75,000.00
4 Alat Perlindungan Diri
a. Topi Pelindung 10 bh 25,000.00 250,000.00
b. Masker 20 bh 7,500.00 150,000.00
c. Sarung Tangan 20 bh 5,000.00 100,000.00
5 Asuransi dan Perijinan
a. Surat ijin Kelayakan Alat 1 Alat 100,000.00 100,000.00
b. Surat ijin Operator 1 Alat 100,000.00 100,000.00
c. Surat ijin Pengesahan Panitia Pembina K3 1 LS 50,000.00 50,000.00
6 Personel K3
a. Petugas K3 1 OB 8,000,000.00 8,000,000.00
b. Safty Man/Pengatur Lalulintas 1 OB 6,500,000.00 6,500,000.00
7 Fasilitas Sarana Kesehatan
a. Peralatan P3K 1 Ls 7,557,500.00 7,557,500.00
8 Rambu-rambu
a. Rambu Peringatan 2 bh 25,000.00 50,000.00
b. Rambu Petunjuk 1 bh 30,000.00 30,000.00
c. Rambu Larangan 1 bh 20,000.00 20,000.00
9 Lain-Lain
a. Bendera K3 2 bh 50,000.00 100,000.00
b. Lampu Darurat 2 bh 65,000.00 130,000.00
c. Pelaporan 1 Ls 100,000.00 100,000.00
Jumlah II: 24,437,500.00
III SDK BUITASIK, Jl. Raya Kimbena RT 01 RW 01, Ds. Bakustulama, Kec. Tasifeto Barat, Kab. Belu, NTT
HARGA SATUAN TOTAL HARGA
NO URAIAN PEKERJAAN SATUAN
( Rp ) ( Rp )
1 Penyiapan RK3K
a. Pembuatan Instrusi Kerja 1 set 75,000.00 75,000.00
b. Pembuatan Kartu Identitas Pekerja 10 org 75,000.00 750,000.00
2 Sosialisasi dan Promosi K3
a. Poster/Banner 2 bh 150,000.00 300,000.00
3 Alat Perlindungan Kerja
a. Pembatas Area 1 Ls 75,000.00 75,000.00
4 Alat Perlindungan Diri
a. Topi Pelindung 10 bh 25,000.00 250,000.00
b. Masker 20 bh 7,500.00 150,000.00
c. Sarung Tangan 20 bh 5,000.00 100,000.00
5 Asuransi dan Perijinan
a. Surat ijin Kelayakan Alat 1 Alat 100,000.00 100,000.00
b. Surat ijin Operator 1 Alat 100,000.00 100,000.00
c. Surat ijin Pengesahan Panitia Pembina K3 1 LS 50,000.00 50,000.00
6 Personel K3
a. Petugas K3 1 OB 8,000,000.00 8,000,000.00
b. Safty Man/Pengatur Lalulintas 1 OB 6,500,000.00 6,500,000.00
7 Fasilitas Sarana Kesehatan
a. Peralatan P3K 1 Ls 7,557,500.00 7,557,500.00
8 Rambu-rambu
a. Rambu Peringatan 2 bh 25,000.00 50,000.00
b. Rambu Petunjuk 1 bh 30,000.00 30,000.00
c. Rambu Larangan 1 bh 20,000.00 20,000.00
9 Lain-Lain
a. Bendera K3 2 bh 50,000.00 100,000.00
b. Lampu Darurat 2 bh 65,000.00 130,000.00
c. Pelaporan 1 Ls 100,000.00 100,000.00
Jumlah III: 24,437,500.00
MARDLIAN SHAH,ST
DIREKTUR
REKAPITULASI
HARGA PERKIRAAN SENDIRI (HPS)
IPAL DOMESTIK DAN MCK
NO URAIAN PEKERJAAN
A. PEKERJAAN IPAL
I PEKERJAAN PERSIAPAN
II PEKERJAAN TANAH
III PEKERJAAN BETON
IV PEKERJAAN PASANGAN DINDING
V PEKERJAAN SANITASI DAN INSTALASI PERPIPAAN
JUMLAH I + II + III + IV + V + VI
B. PEKERJAAN MCK
I PEKERJAAN BETON
II PEKERJAAN PASANGAN DINDING DAN PENUTUP LANTAI DAN DINDING
III PEKERJAAN PASANGAN PINTU DAN PENGECATAN
IV PEKERJAAN SANITASI DAN INSTALASI PERPIPAAN
V PEKERJAAN ATAP
VI PEKERJAAN INSATALASI LISTRIK
JUMLAH I + II + III + IV + V + VI
JUMLAH A + B
PPN 10%
JUMLAH TOTAL
DIBULATKAN
MARDLIAN SHAH,ST
DIREKTUR
sifeto Barat, Kab. Belu, NTT
TOTAL HARGA
( Rp )
3,500,000.00
4,357,051.78
121,782,778.40
6,241,936.65
6,201,692.27
142,083,459.10
41,547,841.17
23,472,793.44
5,948,771.09
9,807,613.83
9,824,329.21
5,436,975.00
96,038,323.74
238,121,782.84
23,812,178.28
261,933,961.12
261,933,000.00
HARGA PERKIRAAN SENDIRI (HPS)
IPAL DOMESTIK DAN MCK
HARGA SATUAN
NO URAIAN PEKERJAAN IPAL ANALISA SATUAN
( Rp )
I PEKERJAAN PERSIAPAN
1 Pembersihan Lahan/ Pengukuran/ Pematokan LS 1 Unit 500,000.00
2 Penyelenggaraan RK3 dan Keselamatan Konstruksi LS 1 Unit 3,000,000.00
JUMLAH I
II PEKERJAAN TANAH
1 Menggali Tanah Biasa Sedalam 1 m A.2.3.1.1 35.28 m3 28,600.00
2 Menggali Tanah Keras Sedalam 1 m A.2.3.1.4 49.392 m3 38,074.67
3 Membuang Tanah sejauh 30 m' A.2.3.1.8 56.448 m3 12,540.00
4 Pengurugan Kembali A.2.3.1.9 28.224 m3 20,533.33
5 Urugan Pasir A.2.3.1.11 3.528 m3 51,040.00
JUMLAH II
III PEKERJAAN BETON
1 Membuat Lantai Kerja Beton mutu f'c=7,4 MPa (K100) A.4.1.1.4 3.528 m3 321,918.73
2 Membuat Beton mutu f'c=14,5 MPa (K175) ( Plat Lantai Bawah ) A.4.1.1.5 7.056 m3 393,230.04
Pembesian dg Besi Polos ( Plat Lantai Bawah ) A.4.1.1.17 290.08 kg 70,440.33
Memasang Bekisting untuk Sloof (Plat Lantai Bawah ) 2x pakai A.4.1.1.21 4.308 m2 47,769.33
3 Membuat Beton mutu f'c=14,5 MPa (K175) ( Dinding ) A.4.1.1.5 12.637 m3 393,230.04
Pembesian dg Besi Polos ( Dinding ) A.4.1.1.17 630.27 kg 70,440.33
Memasang Bekisting untuk ( Dinding ) 2x pakai A.4.1.1.25 109.6 m2 78,958.00
4 Membuat Beton mutu f'c=14,5 MPa (K175) ( Balok ) A.4.1.1.5 0.3666 m3 393,230.04
Pembesian dg Besi Polos ( Balok ) A.4.1.1.17 57.265 kg 70,440.33
Memasang Bekisting untuk ( Balok ) 2x pakai A.4.1.1.23 3.64 m2 88,865.33
5 Membuat Beton mutu f'c=14,5 MPa (K175) ( Plat Lantai Atas ) A.4.1.1.5 4.86 m3 393,230.04
Pembesian dg Besi Polos ( Plat Lantai Atas ) A.4.1.1.17 284.16 kg 70,440.33
Memasang Bekisting untuk Lantai ( Plat Lantai Atas ) A.4.1.1.24 35.28 m2 362,384.00
JUMLAH III
IV PEKERJAAN PASANGAN DINDING DAN PENUTUP LANTAI DAN DINDING
1 Pemasangan Dinding Bata Merah Tebal 1/2 Bata Camp. 1SP : 4PP A.4.4.1.9 18.72 m2 80,300.00
2 Pemasangan Dinding Bata Merah Tebal 1 Bata Camp. 1SP : 4PP A.4.4.1.3 24.96 m2 36,960.00
3 Pemasangan Plesteran 1 Pc : 4 Pp Tebal 20 mm A.4.4.2.15 91 m2 27,746.25
4 Pemasangan Acian A.4.4.2.27 91 m2 14,190.00
JUMLAH IV
V PEKERJAAN SANITASI DAN INSTALASI PERPIPAAN
1 Pemasangan Pipa PVC tipe AW Ø 2" A.5.1.1.29 2 m' 20,742.33
2 Pemasangan Pipa PVC tipe AW Ø 3" A.5.1.1.31 39.6 m' 24,247.67
3 Pemasangan Tee Ø 3 Ls 24 bh 33,333.33
4 Pemasangan Tutup Manhole Taksir 1 8 bh 50,000.00
5 Pemasangan ijuk Ls 2 Unit 2,000,000.00
JUMLAH V
JUMLAH I + II + III + IV + V
TOTAL HARGA
( Rp )
500,000.00
3,000,000.00
3,500,000.00
1,009,008.00
1,880,583.94
707,857.92
579,532.80
180,069.12
4,357,051.78
1,135,729.30
2,774,631.14
20,433,331.89
205,790.29
4,969,169.33
44,396,269.23
8,654,112.63
144,158.13
4,033,786.04
323,469.81
1,911,097.98
20,016,325.12
12,784,907.52
121,782,778.40
1,503,216.00
922,521.60
2,524,909.05
1,291,290.00
6,241,936.65
41,484.67
960,207.60
800,000.00
400,000.00
4,000,000.00
6,201,692.27
142,083,459.10
HARGA PERKIRAAN SENDIRI (HPS)
IPAL DOMESTIK DAN MCK
TOTAL HARGA
NO URAIAN PEKERJAAN
( Rp )
A. PEKERJAAN IPAL
I PEKERJAAN PERSIAPAN 3,500,000.00
II PEKERJAAN TANAH 4,357,051.78
III PEKERJAAN BETON 121,782,778.40
IV PEKERJAAN PASANGAN DINDING 6,241,936.65
V PEKERJAAN SANITASI DAN INSTALASI PERPIPAAN 6,201,692.27
JUMLAH I + II + III + IV + V + VI 142,083,459.10
B. PEKERJAAN MCK
I PEKERJAAN BETON 41,547,841.17
II PEKERJAAN PASANGAN DINDING DAN PENUTUP LANTAI DAN DINDING 23,472,793.44
III PEKERJAAN PASANGAN PINTU DAN PENGECATAN 5,948,771.09
IV PEKERJAAN SANITASI DAN INSTALASI PERPIPAAN 9,807,613.83
V PEKERJAAN ATAP 9,824,329.21
VI PEKERJAAN INSATALASI LISTRIK 5,436,975.00
JUMLAH I + II + III + IV + V + VI 96,038,323.74
JUMLAH A + B 238,121,782.84
PPN 10% 23,812,178.28
JUMLAH TOTAL 261,933,961.12
DIBULATKAN 261,933,000.00
MARDLIAN SHAH,ST
DIREKTUR
HARGA PERKIRAAN SENDIRI (HPS)
IPAL DOMESTIK DAN MCK
TOTAL HARGA
NO URAIAN PEKERJAAN
( Rp )
A. PEKERJAAN IPAL
I PEKERJAAN PERSIAPAN 3,500,000.00
II PEKERJAAN TANAH 4,357,051.78
III PEKERJAAN BETON 121,782,778.40
IV PEKERJAAN PASANGAN DINDING 6,241,936.65
V PEKERJAAN SANITASI DAN INSTALASI PERPIPAAN 6,201,692.27
JUMLAH I + II + III + IV + V + VI 142,083,459.10
B. PEKERJAAN MCK
I PEKERJAAN BETON 41,547,841.17
II PEKERJAAN PASANGAN DINDING DAN PENUTUP LANTAI DAN DINDING 23,472,793.44
III PEKERJAAN PASANGAN PINTU DAN PENGECATAN 5,948,771.09
IV PEKERJAAN SANITASI DAN INSTALASI PERPIPAAN 9,807,613.83
V PEKERJAAN ATAP 9,824,329.21
VI PEKERJAAN INSATALASI LISTRIK 5,436,975.00
JUMLAH I + II + III + IV + V + VI 96,038,323.74
JUMLAH A + B 238,121,782.84
PPN 10% 23,812,178.28
JUMLAH TOTAL 261,933,961.12
DIBULATKAN 261,933,000.00
MARDLIAN SHAH,ST
DIREKTUR
HARGA PERKIRAAN SENDIRI (HPS)
IPAL DOMESTIK DAN MCK
HARGA SATUAN
NO URAIAN PEKERJAAN IPAL ANALISA SATUAN
( Rp )
I PEKERJAAN PERSIAPAN
1 Pembersihan Lahan/ Pengukuran/ Pematokan LS 1 Unit 500,000.00
2 Penyelenggaraan RK3 dan Keselamatan Konstruksi LS 1 Unit 3,000,000.00
JUMLAH I
II PEKERJAAN TANAH
1 Menggali Tanah Biasa Sedalam 1 m A.2.3.1.1 35.28 m3 28,600.00
2 Menggali Tanah Keras Sedalam 1 m A.2.3.1.4 49.392 m3 38,074.67
3 Membuang Tanah sejauh 30 m' A.2.3.1.8 56.448 m3 12,540.00
4 Pengurugan Kembali A.2.3.1.9 28.224 m3 20,533.33
5 Urugan Pasir A.2.3.1.11 3.528 m3 51,040.00
JUMLAH II
III PEKERJAAN BETON
1 Membuat Lantai Kerja Beton mutu f'c=7,4 MPa (K100) A.4.1.1.4 3.528 m3 321,918.73
2 Membuat Beton mutu f'c=14,5 MPa (K175) ( Plat Lantai Bawah ) A.4.1.1.5 7.056 m3 393,230.04
Pembesian dg Besi Polos ( Plat Lantai Bawah ) A.4.1.1.17 290.08 kg 70,440.33
Memasang Bekisting untuk Sloof (Plat Lantai Bawah ) 2x pakai A.4.1.1.21 4.308 m2 47,769.33
3 Membuat Beton mutu f'c=14,5 MPa (K175) ( Dinding ) A.4.1.1.5 12.637 m3 393,230.04
Pembesian dg Besi Polos ( Dinding ) A.4.1.1.17 630.27 kg 70,440.33
Memasang Bekisting untuk ( Dinding ) 2x pakai A.4.1.1.25 109.6 m2 78,958.00
4 Membuat Beton mutu f'c=14,5 MPa (K175) ( Balok ) A.4.1.1.5 0.3666 m3 393,230.04
Pembesian dg Besi Polos ( Balok ) A.4.1.1.17 57.265 kg 70,440.33
Memasang Bekisting untuk ( Balok ) 2x pakai A.4.1.1.23 3.64 m2 88,865.33
5 Membuat Beton mutu f'c=14,5 MPa (K175) ( Plat Lantai Atas ) A.4.1.1.5 4.86 m3 393,230.04
Pembesian dg Besi Polos ( Plat Lantai Atas ) A.4.1.1.17 284.16 kg 70,440.33
Memasang Bekisting untuk Lantai ( Plat Lantai Atas ) A.4.1.1.24 35.28 m2 362,384.00
JUMLAH III
IV PEKERJAAN PASANGAN DINDING DAN PENUTUP LANTAI DAN DINDING
1 Pemasangan Dinding Bata Merah Tebal 1/2 Bata Camp. 1SP : 4PP A.4.4.1.9 18.72 m2 80,300.00
2 Pemasangan Dinding Bata Merah Tebal 1 Bata Camp. 1SP : 4PP A.4.4.1.3 24.96 m2 36,960.00
3 Pemasangan Plesteran 1 Pc : 4 Pp Tebal 20 mm A.4.4.2.15 91 m2 27,746.25
4 Pemasangan Acian A.4.4.2.27 91 m2 14,190.00
JUMLAH IV
V PEKERJAAN SANITASI DAN INSTALASI PERPIPAAN
1 Pemasangan Pipa PVC tipe AW Ø 2" A.5.1.1.29 2 m' 20,742.33
2 Pemasangan Pipa PVC tipe AW Ø 3" A.5.1.1.31 39.6 m' 24,247.67
3 Pemasangan Tee Ø 3 Ls 24 bh 33,333.33
4 Pemasangan Tutup Manhole Taksir 1 8 bh 50,000.00
5 Pemasangan ijuk Ls 2 Unit 2,000,000.00
JUMLAH V
JUMLAH I + II + III + IV + V
ab. Belu, NTT
TOTAL HARGA
( Rp )
500,000.00
3,000,000.00
3,500,000.00
1,009,008.00
1,880,583.94
707,857.92
579,532.80
180,069.12
4,357,051.78
1,135,729.30
2,774,631.14
20,433,331.89
205,790.29
4,969,169.33
44,396,269.23
8,654,112.63
144,158.13
4,033,786.04
323,469.81
1,911,097.98
20,016,325.12
12,784,907.52
121,782,778.40
1,503,216.00
922,521.60
2,524,909.05
1,291,290.00
6,241,936.65
41,484.67
960,207.60
800,000.00
400,000.00
4,000,000.00
6,201,692.27
142,083,459.10
HARGA PERKIRAAN SENDIRI (HPS)
IPAL DOMESTIK DAN MCK
CK Boyolali
0.40 Kg Paku Biasa 2" - 5" 0.00 -
0.20 Ltr Minyak Bekisting 0.00 -
0.02 m3 Balok Kayu Klas II (Borneo) #REF! #REF!
0.35 Lbr Plywood tebal 9mm 0.00 -
6.00 Btg Bambu 0.00 -
C PERALATAN
D Jumlah A + B + C #REF!
E Overhead & Profit 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!
CK Boyolali
HARGA JUMLAH
No. KOEF SAT. #REF! BAHAN/UPAH
Rp Rp
HARGA SATUAN PEKERJAAN PEMINDAHAN TANAMAN
1 1 BTG Memindahkan Tanaman Sedang (dalam satu area) #REF!
A TENAGA -
2.00 OH Pekerja - -
1.00 OH Mandor - -
B BAHAN #REF!
1.20 m3 Air - -
0.50 m3 Tanah Subur #REF! #REF!
1.00 btg Bambu penegak - -
C PERALATAN
D Jumlah A + B + C #REF!
E Overhead & Profit 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!
CK Boyolali
DAFTAR ANALISA PEKERJAAN PROYEK
40 Taksir 1 1 m2 Pasang Kuda2 Baja ringan + Reng Untuk Atap Genteng Metal Rp 415,562
A Tenaga Rp 82,800
L.01 0.20 OH Pekerja Rp 100,000 Rp 20,000
L.02 0.45 OH Tukang Besi Rp 120,000 Rp 54,000
L.03 0.01 OH Kepala Tukang Rp 130,000 Rp 1,300
L.04 0.050 OH Mandor Rp 150,000 Rp 7,500
B Bahan Rp 294,984
1.488 m C- 75, 0.8 Rp 15,000 Rp 22,320
2.232 m C- 75, 0.6 Rp 12,000 Rp 26,784
28.000 bh Baut (Srew driver) Rp 5,500 Rp 154,000
1.600 bh Dynabolt Rp 25,000 Rp 40,000
5.400 m Reng Rp 8,000 Rp 43,200
0.124 m Talang Jurai Rp 70,000 Rp 8,680
C PERALATAN
D Jumlah A + B + C Rp 377,784
E Overhead & Profit 10% Rp 37,778
F Harga Satuan Pekerjaan (D+E) Rp 415,562
41 Taksir 2 1 bh Pemasangan tee Ø 4' Rp 46,200
A Tenaga Rp 12,000
L.01 0.036 OH Pekerja Rp 100,000 Rp 3,600
L.02 0.06 OH Tukang Batu Rp 140,000 Rp 8,400
B Bahan Rp 30,000
1 bh Tee Ø 4' Rp 30,000 Rp 30,000
C PERALATAN
D Jumlah A + B + C Rp 42,000
E Overhead & Profit 10% Rp 4,200
F Harga Satuan Pekerjaan (D+E) Rp 46,200
42 Taksir 3 1 bh Pemasangan elbow Ø 4' Rp 61,710
A Tenaga Rp 11,100
L.01 0.036 OH Pekerja Rp 100,000 Rp 3,600
L.02 0.06 OH Tukang Batu Rp 125,000 Rp 7,500
B Bahan Rp 45,000
1 bh Elbow Ø 4' Rp 45,000 Rp 45,000
C PERALATAN
D Jumlah A + B + C Rp 56,100
E Overhead & Profit 10% Rp 5,610
F Harga Satuan Pekerjaan (D+E) Rp 61,710
43 Taksir 4 1 bh Pemasangan Tee Ø 3" Rp 36,410
A Tenaga Rp 11,100
L.01 0.036 OH Pekerja Rp 100,000 Rp 3,600
L.02 0.06 OH Tukang Batu Rp 125,000 Rp 7,500
B Bahan Rp 22,000.00
1 bh Tee Ø 3' Rp 22,000.00 Rp 22,000.00
C PERALATAN
D Jumlah A + B + C Rp 33,100.00
E Overhead & Profit 10% Rp 3,310.00
F Harga Satuan Pekerjaan (D+E) Rp 36,410.00
44 Taksir 5 1 bh Pemasangan Elbow Ø 3" Rp 32,010.00
A Tenaga Rp 11,100.00
L.01 0.036 OH Pekerja Rp 100,000 Rp 3,600.00
L.02 0.06 OH Tukang Batu Rp 125,000 Rp 7,500.00
B Bahan Rp 18,000.00
1 bh Elbow Ø 3' Rp 18,000.00 Rp 18,000.00
C PERALATAN
D Jumlah A + B + C Rp 29,100.00
E Overhead & Profit 10% Rp 2,910.00
F Harga Satuan Pekerjaan (D+E) Rp 32,010.00
45 Taksir 6 1 bh Pemasangan Elbow Ø 3/4" Rp 29,810.00
A Tenaga Rp 11,100.00
L.01 0.036 OH Pekerja Rp 100,000.00 Rp 3,600.00
L.02 0.06 OH Tukang Batu Rp 125,000.00 Rp 7,500.00
B Bahan Rp 16,000.00
1 bh Elbow Ø 3/4' Rp 16,000.00 Rp 16,000.00
C PERALATAN
D Jumlah A + B + C Rp 27,100.00
E Overhead & Profit 10% Rp 2,710.00
F Harga Satuan Pekerjaan (D+E) Rp 29,810.00
46 Taksir 7 1 bh Pemasangan Tee Ø 3/4" Rp 28,710.00
A Tenaga Rp 11,100.00
L.01 0.036 OH Pekerja Rp 100,000.00 Rp 3,600.00
L.02 0.06 OH Tukang Batu Rp 125,000.00 Rp 7,500.00
B Bahan Rp 15,000.00
1 bh Tee Ø 3/4' Rp 15,000.00 Rp 15,000.00
C PERALATAN
D Jumlah A + B + C Rp 26,100.00
E Overhead & Profit 10% Rp 2,610.00
F Harga Satuan Pekerjaan (D+E) Rp 28,710.00
47 Taksir 8 1 bh Pemasangan Manhole Beton Rp 94,710.00
A Tenaga Rp 11,100.00
L.01 0.036 OH Pekerja Rp 100,000.00 Rp 3,600.00
L.02 0.06 OH Tukang Batu Rp 125,000.00 Rp 7,500.00
B Bahan Rp 75,000.00
1 bh Manhole Beton Rp 75,000.00 Rp 75,000.00
C PERALATAN
D Jumlah A + B + C Rp 86,100.00
E Overhead & Profit 10% Rp 8,610.00
F Harga Satuan Pekerjaan (D+E) Rp 94,710.00
48 Taksir 9 1 bh Pemasangan Pintu Kamar mandi Rp 826,100.00
A Tenaga Rp 51,000.00
L.01 0.01 OH Pekerja Rp 100,000.00 Rp 1,000.00
L.02 0.4 OH Tukang Kayu Rp 125,000.00 Rp 50,000.00
B Bahan Rp 700,000.00
1 bh Pintu Kayu Ulin Rp 700,000.00 Rp 700,000.00
C PERALATAN
D Jumlah A + B + C Rp 751,000.00
E Overhead & Profit 10% Rp 75,100.00
F Harga Satuan Pekerjaan (D+E) Rp 826,100.00
49 Taksir 10 1 bh Pemasangan Kompor satu tungku Rp 170,445.00
A Tenaga Rp 54,950.00
L.01 0.01 OH Pekerja Rp 100,000 Rp 1,000.00
L.02 0.4 OH Tukang Batu Rp 120,000 Rp 48,000.00
L.03 0.04 OH Kepala Tukang Rp 130,000 Rp 5,200.00
L.04 0.005 OH Mandor Rp 150,000 Rp 750.00
B Bahan Rp 100,012.50
1 bh Kompor satu tungku Rp 100,000.00 Rp 100,000.00
0.0025 bh Sealtape Rp 5,000.00 Rp 12.50
C PERALATAN
D Jumlah A + B + C Rp 154,950.00
E Overhead & Profit 10% Rp 15,495.00
F Harga Satuan Pekerjaan (D+E) Rp 170,445.00
50 Taksir 11 1 bh Pemasangan Manometer Rp 142,945.00
A Tenaga Rp 54,950.00
L.01 0.01 OH Pekerja Rp 100,000 Rp 1,000.00
L.02 0.4 OH Tukang Batu Rp 120,000 Rp 48,000.00
L.03 0.04 OH Kepala Tukang Rp 130,000 Rp 5,200.00
L.04 0.005 OH Mandor Rp 150,000 Rp 750.00
B Bahan Rp 75,055.00
1 bh Manometer Rp 75,000.00 Rp 75,000.00
0.0025 bh Sealtape Rp 22,000.00 Rp 55.00
C PERALATAN
D Jumlah A + B + C Rp 129,950.00
E Overhead & Profit 10% Rp 12,995.00
F Harga Satuan Pekerjaan (D+E) Rp 142,945.00
51 Taksir 12 0 F Pemasangan Stop Kran Ø 3/4" Rp 255,075.00
A Tenaga Rp 54,950.00
L.01 0.01 OH Pekerja Rp 100,000.00 Rp 1,000.00
L.02 0.4 OH Tukang Batu Rp 120,000.00 Rp 48,000.00
L.03 0.04 OH Kepala Tukang Rp 130,000.00 Rp 5,200.00
L.04 0.005 OH Mandor Rp 150,000.00 Rp 750.00
B Bahan Rp 200,125.00
1 bh Stop Kran Ø 3/4 Rp 200,000.00 Rp 200,000.00
0.025 bh Sealtape Rp 5,000.00 Rp 125.00
C PERALATAN
D Jumlah A + B + C Rp 255,075.00
E Overhead & Profit #REF! Rp 2,550,750.00
F Harga Satuan Pekerjaan (D+E) Rp 255,075.00
51 Taksir 13 1 bh Pemasangan Stop Kran Ø 1/2 " Rp 96,745.00
A Tenaga Rp 54,950.00
L.01 0.01 OH Pekerja Rp 100,000 Rp 1,000.00
L.02 0.4 OH Tukang Batu Rp 120,000 Rp 48,000.00
L.03 0.04 OH Kepala Tukang Rp 130,000 Rp 5,200.00
L.04 0.005 OH Mandor Rp 150,000 Rp 750.00
B Bahan Rp 33,550.00
1 bh Stop Kran Ø 1/2 Rp 33,000.00 Rp 33,000.00
0.025 bh Sealtape Rp 22,000.00 Rp 550.00
C PERALATAN
D Jumlah A + B + C Rp 87,950.00
E Overhead & Profit 10% Rp 8,795.00
F Harga Satuan Pekerjaan (D+E) Rp 96,745.00
1 A.4.6.1.2 1 bh Pembuatan & Pemasangan Kosen Pintu & Jendela Kayu Kelas II Rp 8,157,600.00
A Tenaga Rp 3,545,500.00
L.01 7.000 OH Pekerja Rp 100,000 Rp 700,000.00
L.02 21.000 OH Tukang Batu Rp 120,000 Rp 2,520,000.00
L.03 2.100 OH Kepala Tukang Rp 130,000 Rp 273,000.00
L.04 0.350 OH Mandor Rp 150,000 Rp 52,500.00
B Bahan Rp 3,870,500.00
1.100 M3 Kayu Kelas II Rp 3,480,000.00 Rp 3,828,000.00
1.250 kg Paku biasa 2" - 5" Rp 18,000.00 Rp 22,500.00
1.000 kg Lem kayu Rp 20,000.00 Rp 20,000.00
C PERALATAN
D Jumlah A + B + C Rp 7,416,000.00
E Overhead & Profit 10% Rp 741,600.00
F Harga Satuan Pekerjaan (D+E) Rp 8,157,600.00
51 A.4.6.1.4 1 bh Pembuatan & Pemasangan Pintu Klamp Standard Kayu Kelas II Rp 349,195.00
A Tenaga Rp 177,350.00
L.01 0.350 OH Pekerja Rp 100,000 Rp 35,000.00
L.02 1.050 OH Tukang Batu Rp 120,000 Rp 126,000.00
L.03 0.105 OH Kepala Tukang Rp 130,000 Rp 13,650.00
L.04 0.018 OH Mandor Rp 150,000 Rp 2,700.00
B Bahan Rp 140,100.00
0.040 M3 Papan Kayu Rp 3,480,000.00 Rp 139,200.00
0.050 kg Paku biasa 5 cm - 7 cm Rp 18,000.00 Rp 900.00
C PERALATAN
D Jumlah A + B + C Rp 317,450.00
E Overhead & Profit 10% Rp 31,745.00
F Harga Satuan Pekerjaan (D+E) Rp 349,195.00
1 A.4.6.1.4 1 bh Pembuatan & Pemasangan Pintu Klamp Standard Kayu Kelas II Rp 349,195.00
A Tenaga Rp 177,350.00
L.01 0.350 OH Pekerja Rp 100,000.00 Rp 35,000.00
L.02 1.050 OH Tukang Batu Rp 120,000.00 Rp 126,000.00
L.03 0.105 OH Kepala Tukang Rp 130,000.00 Rp 13,650.00
L.04 0.018 OH Mandor Rp 150,000.00 Rp 2,700.00
B Bahan Rp 140,100.00
0.040 M3 Papan Kayu Rp 3,480,000.00 Rp 139,200.00
0.050 kg Paku biasa 5 cm - 7 cm Rp 18,000.00 Rp 900.00
C PERALATAN
D Jumlah A + B + C Rp 317,450.00
E Overhead & Profit 10% Rp 31,745.00
F Harga Satuan Pekerjaan (D+E) Rp 349,195.00
A.4.6.2.5 1 m2 Pemasangan Engsel Pintu Rp 78,718.75
A Tenaga Rp 21,562.50
L.01 0.015 OH Pekerja Rp 100,000.00 Rp 1,500.00
L.02 0.150 OH Tukang Batu Rp 120,000.00 Rp 18,000.00
L.03 0.015 OH Kepala Tukang Rp 130,000.00 Rp 1,950.00
L.04 0.00075 OH Mandor Rp 150,000.00 Rp 112.50
B Bahan Rp 50,000.00
1.0000 M3 Engsel Rp 50,000.00 Rp 50,000.00
C PERALATAN
D Jumlah A + B + C Rp 71,562.50
E Overhead & Profit 10% Rp 7,156.25
F Harga Satuan Pekerjaan (D+E) Rp 78,718.75
A.4.6.2.11a 1 m2 Pemasangan Kunci Selot Rp 459,470.00
A Tenaga Rp 67,700.00
L.01 OH Pekerja Rp 100,000.00 Rp -
L.02 0.010 OH Tukang Batu Rp 120,000.00 Rp 1,200.00
L.03 0.500 OH Kepala Tukang Rp 130,000.00 Rp 65,000.00
L.04 0.010 OH Mandor Rp 150,000.00 Rp 1,500.00
0.005 B Bahan Rp 350,000.00
1.0000 M3 Kunci Slott Rp 350,000.00 Rp 350,000.00
C PERALATAN
D Jumlah A + B + C Rp 417,700.00
E Overhead & Profit 10% Rp 41,770.00
F Harga Satuan Pekerjaan (D+E) Rp 459,470.00
A.4.6.2.11b 1 m2 Pemasangan Gagang Hendle Pintu Biasa Rp 581,350.00
A Tenaga Rp 178,500.00
L.01 1.0000 OH Pekerja Rp 100,000.00 Rp 100,000.00
L.02 0.050 OH Tukang Batu Rp 120,000.00 Rp 6,000.00
L.03 0.500 OH Kepala Tukang Rp 130,000.00 Rp 65,000.00
L.04 0.050 OH Mandor Rp 150,000.00 Rp 7,500.00
B Bahan Rp 350,000.00
1.0000 M3 Kunci Slott Rp 350,000.00 Rp 350,000.00
C PERALATAN
D Jumlah A + B + C Rp 528,500.00
E Overhead & Profit 10% Rp 52,850.00
F Harga Satuan Pekerjaan (D+E) Rp 581,350.00
A.4.7.1.10 1 m2 Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar 2 lap. Cat Penutup) Rp 73,979.40
A Tenaga Rp 10,754.00
L.01 0.020 OH Pekerja Rp 100,000.00 Rp 2,000.00
L.02 0.063 OH Tukang Batu Rp 120,000.00 Rp 7,560.00
L.03 0.006 OH Kepala Tukang Rp 130,000.00 Rp 819.00
L.04 0.0025 OH Mandor Rp 150,000.00 Rp 375.00
B Bahan Rp 56,500.00
0.1000 M3 Plamir Rp 25,000.00 Rp 2,500.00
0.1000 kg Cat dasar Rp 150,000.00 Rp 15,000.00
0.2600 kg Cat penutup Rp 150,000.00 Rp 39,000.00
C PERALATAN
D Jumlah A + B + C Rp 67,254.00
E Overhead & Profit 10% Rp 6,725.40
F Harga Satuan Pekerjaan (D+E) Rp 73,979.40
A.4.2.1.21 1 m2 Pemasangan 1 m2 rangka besi hollow 1x40.40.2 mm, modul 60 x 60 cm Rp 221,705.00
A Tenaga Rp 24,050.00
L.01 0.1000 OH Pekerja Rp 100,000.00 Rp 10,000.00
L.02 0.1000 OH Tukang Besi Rp 120,000.00 Rp 12,000.00
L.03 0.0100 OH Kepala Tukang Rp 130,000.00 Rp 1,300.00
L.04 0.0050 OH Mandor Rp 150,000.00 Rp 750.00
B Bahan Rp 177,500.00
1.0500 Kg GRC Rp 150,000.00 Rp 157,500.00
4.0000 Bh Baut Rp 5,000.00 Rp 20,000.00
C PERALATAN
D Jumlah A + B + C Rp 201,550.00
E Overhead & Profit 10% Rp 20,155.00
F Harga Satuan Pekerjaan (D+E) Rp 221,705.00
A.4.5.2.32 1 m2 Pemasangan Atap Genteng Metal Rp 181,005.00
A Tenaga Rp 33,450.00
L.01 0.2000 OH Pekerja Rp 100,000.00 Rp 20,000.00
L.02 0.1000 OH Tukang Besi Rp 120,000.00 Rp 12,000.00
L.03 0.0100 OH Kepala Tukang Rp 130,000.00 Rp 1,300.00
L.04 0.0010 OH Mandor Rp 150,000.00 Rp 150.00
B Bahan Rp 131,100.00
1.0200 Kg Genteng Metal Rp 125,000.00 Rp 127,500.00
0.2000 Bh Paku Biasa Rp 18,000.00 Rp 3,600.00
C PERALATAN
D Jumlah A + B + C Rp 164,550.00
E Overhead & Profit 10% Rp 16,455.00
F Harga Satuan Pekerjaan (D+E) Rp 181,005.00
A.4.5.1.1 1 m2 Pemasangan Plafon / Langit - Langit GRC Rp 54,452.75
A Tenaga Rp 30,212.50
L.01 0.0025 OH Pekerja Rp 100,000.00 Rp 250.00
L.02 0.2250 OH Tukang Besi Rp 120,000.00 Rp 27,000.00
L.03 0.0225 OH Kepala Tukang Rp 130,000.00 Rp 2,925.00
L.04 0.0003 OH Mandor Rp 150,000.00 Rp 37.50
B Bahan Rp 19,290.00
0.3750 LBR GRC Rp 50,000.00 Rp 18,750.00
0.0300 Bh Paku Biasa Rp 18,000.00 Rp 540.00
C PERALATAN
D Jumlah A + B + C Rp 49,502.50
E Overhead & Profit 10% Rp 4,950.25
F Harga Satuan Pekerjaan (D+E) Rp 54,452.75
A.4.2.1.21 1 m2 Pemasangan rangka besi hollow modul 60 x 60 cm, plafon Rp 202,248.75
A Tenaga Rp 30,212.50
L.01 0.0025 OH Pekerja Rp 100,000.00 Rp 250.00
L.02 0.2250 OH Tukang Besi Rp 120,000.00 Rp 27,000.00
L.03 0.0225 OH Kepala Tukang Rp 130,000.00 Rp 2,925.00
L.04 0.0003 OH Mandor Rp 150,000.00 Rp 37.50
B Bahan Rp 153,650.00
3.6600 Kg Besi Hollow 40.40.1 Rp 40,000.00 Rp 146,400.00
1.4500 Bh Kawat Las Listrik Rp 5,000.00 Rp 7,250.00
C PERALATAN
D Jumlah A + B + C Rp 183,862.50
E Overhead & Profit 10% Rp 18,386.25
F Harga Satuan Pekerjaan (D+E) Rp 202,248.75
A.4.2.1.21 1 m2 Pemasangan List Plafon Rp 53,790.00
A Tenaga Rp 12,100.00
L.01 0.0500 OH Pekerja Rp 100,000.00 Rp 5,000.00
L.02 0.0500 OH Tukang Besi Rp 120,000.00 Rp 6,000.00
L.03 0.0050 OH Kepala Tukang Rp 130,000.00 Rp 650.00
L.04 0.0030 OH Mandor Rp 150,000.00 Rp 450.00
B Bahan Rp 36,800.00
1.0500 M' List profil Rp 35,000.00 Rp 36,750.00
0.0100 Kg Paku Rp 5,000.00 Rp 50.00
C PERALATAN
D Jumlah A + B + C Rp 48,900.00
E Overhead & Profit 10% Rp 4,890.00
F Harga Satuan Pekerjaan (D+E) Rp 53,790.00
A.4.2.1.21 1 m2 Pemasangan Instalasi Lampu Rp 87,560.00
A Tenaga Rp 100,000.00 Rp 29,600.00
L.01 0.200 OH Pekerja Rp 120,000.00 Rp 24,000.00
L.02 0.020 OH Tukang Listrik Rp 130,000.00 Rp 2,600.00
L.03 0.020 OH Kepala Tukang Listrik Rp 150,000.00 Rp 3,000.00
B Bahan Rp 50,000.00
1.000 Kg Lampu TL 20 watt Rp 50,000.00 Rp 50,000.00
C PERALATAN
D Jumlah A + B + C Rp 79,600.00
E Overhead & Profit 10% Rp 7,960.00
F Harga Satuan Pekerjaan (D+E) Rp 87,560.00
A.4.2.1.21 1 m2 Pemasangan Stop Kontak Rp 243,650.00
A Tenaga Rp 71,500.00
L.01 0.050 OH Pekerja Rp 100,000.00 Rp 5,000.00
L.02 0.500 OH Tukang Besi Rp 120,000.00 Rp 60,000.00
L.03 0.050 OH Kepala Tukang Rp 130,000.00 Rp 6,500.00
B Bahan Rp 150,000.00 Rp 150,000.00
15.000 m' Kabel NYA 3 x 2,5 mm Rp 10,000.00 Rp 150,000.00
1.200 btg Lampu Dan Stob Kontak Rp 160,000.00 Rp 192,000.00
C PERALATAN
D Jumlah A + B + C Rp 221,500.00
E Overhead & Profit 10% Rp 22,150.00
F Harga Satuan Pekerjaan (D+E) Rp 243,650.00
A.4.2.1.21 1 m2 Pemasangan Sekring Box Rp 94,050.00
A Tenaga Rp 25,500.00
L.01 0.200 OH Pekerja Rp 100,000.00 Rp 20,000.00
L.02 0.020 OH Tukang Besi Rp 125,000.00 Rp 2,500.00
L.03 0.020 OH Kepala Tukang Rp 150,000.00 Rp 3,000.00
B Bahan Rp 60,000.00
1.000 m' Skring kaat Rp 60,000.00 Rp 60,000.00
C PERALATAN
D Jumlah A + B + C Rp 85,500.00
E Overhead & Profit 10% Rp 8,550.00
F Harga Satuan Pekerjaan (D+E) Rp 94,050.00
A.4.2.1.21 1 m2 Pemasangan MCB Box Rp 413,325.00
A Tenaga Rp 225,750.00
L.01 1.000 OH Pekerja Rp 100,000.00 Rp 100,000.00
L.02 1.000 OH Tukang Besi Rp 125,000.00 Rp 125,000.00
L.03 0.005 OH Kepala Tukang Rp 150,000.00 Rp 750.00
B Bahan Rp 150,000.00
1.000 m' Panel Box + MCB Rp 150,000.00 Rp 150,000.00
12.000 btg Kabel NYA 1 x 2,5 mm Rp 10,000.00 Rp 120,000.00
1.000 bh Isolasi Rp 10,000.00 Rp 10,000.00
C PERALATAN
D Jumlah A + B + C Rp 375,750.00
E Overhead & Profit 10% Rp 37,575.00
F Harga Satuan Pekerjaan (D+E) Rp 413,325.00
A.4.2.1.21 1 m2 Lampu LED 9 Watt Rp 4,675.00
A Tenaga Rp 4,250.00
L.01 0.010 OH Pekerja Rp 100,000.00 Rp 1,000.00
L.02 0.020 OH Tukang Besi Rp 125,000.00 Rp 2,500.00
L.03 0.005 OH Kepala Tukang Rp 150,000.00 Rp 750.00
B Bahan Rp -
1.000 Kg Lampu LED 9 Watt 90000 Rp 90,000.00
C PERALATAN
D Jumlah A + B + C Rp 4,250.00
E Overhead & Profit 10% Rp 425.00
F Harga Satuan Pekerjaan (D+E) Rp 4,675.00
A.4.2.1.21 1 m2 Lampu LED 3 Watt Rp 37,675.00
A Tenaga Rp 4,250.00
L.01 0.010 OH Pekerja Rp 100,000.00 Rp 1,000.00
L.02 0.020 OH Tukang Besi Rp 125,000.00 Rp 2,500.00
L.03 0.005 OH Kepala Tukang Rp 150,000.00 Rp 750.00
B Bahan Rp 30,000.00
1.000 Kg Lampu LED 3 Watt Rp 30,000.00 Rp 30,000.00
C PERALATAN
D Jumlah A + B + C Rp 34,250.00
E Overhead & Profit 10% Rp 3,425.00
F Harga Satuan Pekerjaan (D+E) Rp 37,675.00