Anda di halaman 1dari 434

DAFTAR HARGA SATUAN BAHAN BANGUNAN

PEKERJAAN : -
LOKASI : -
TAHUN ANGGARAN : -

HARGA
NO. J E N I S B A H A N SATUAN (Rp)

I BAHAN DASAR
1 BATU KALI Bulat Utuh m3
Bulat Belah m3 190,000
Pecah 10/15 m3 190,000
Pecah 5/7 m3 200,000
Pecah 3/5 m3 198,300
2 KERIKIL Timbunan Pilihan m3 114,000
Sawur / Koral m3 84,200
Beton 0,5/1 m3 101,600
Beton 1/2 m3 214,850
Beton 2/3 m3 206,000
Biasa m3
Tras Giling m3
3 BATU BATA ex lokal bh 650
Concrete Blok (CB 15) / Batako (Lubang2) bh
Batako Padat bh
Rosteer beton cetak 12 x 11 x 24 cm bh
Rosteer tanah liat bakar 12 x 11 x 24 cm bh

4 PASIR Urug m3 105,000


Pasang m3 185,000
Beton m3 185,000
5 TANAH Padas m3 42,500
Liat m3
Subur m3
6 KAPUR Pasang m3 198,000
Semen Merah m3
7 PORTLAND CEMENT
Gresik 40 kg zak 62,000
Holcim 40 kg zak 62,000
Holcim 50 kg zak
Cibinong 40 kg zak
Cibinong 50 kg zak
Portland Cement kg 1,338
Semen Putih 40 kg zak
Semen Putih 50 kg zak
Semen warna kg 1,755

CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)

II B A H A N P E N U T U P A T A P
1 SIRAP (100 lbr) pak
Sirap asbes semen m2

2 GENTENG BETON
Genteng Beton Warna standard bh
Genteng Beton Warna Special bh
Genteng Beton Warna Khusus bh
Kerpus Beton Warna Standard bh 4,900
Kerpus Beton Warna Special bh
Kerpus Beton Warna Khusus bh
Genteng beton ex. Mutiara bh
Genteng beton flat ex. Mutiara bh
Genteng press beton polos tipe nusantara 2,400

3 GENTENG TANAH LIAT


Vlaam bh 400
Kodok bh
Kodok Glasur bh
Nok kerpus Kodok bh
Nok kerpus Kodok Glasur bh
Plentong super besar 18 bh/m2 bh
Nok kerpus plentong super bh 2,400
Kerpus press beton 4,900
Kerpus press mantili 5,700
Kerpus press tipe soka kebumen 5,700
Genteng lokal tipe plenthong
Genteng kebumen tipe plentong kecil
Genteng kebumen tipe morando
Genteng kebumen tipe kodok
Genteng keramik ex. Kanmuri
Genteng keramik ex. KIA KW I
Genteng kerpus lokal
Genteng kerpus kebumen
Genteng kerpus keramik
Genteng soka kebumen plentong besar 1,900
Genteng soka kebumen plentong kecil 1,700
Genteng press mantili besar 1,450
Genteng press mantili kecil 1,350

4 GENTENG KACA
Vlaam tebal 2 mm bh
Vlaam tebal 3 mm bh
Kodok tebal 2 mm bh
Kodok tebal 3 mm bh

CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)

5 ASBES GELOMBANG BESAR


. 200 cm X 102 cm X 5 mm bh
. 225 cm X 102 cm X 5 mm bh
. 250 cm X 102 cm X 5 mm bh
. 200 cm X 102 cm X 6 mm bh
. 225 cm X 102 cm X 6 mm bh
. 250 cm X 102 cm X 6 mm bh
Asbes Gelombang Kecil
. 150 cm X 105 cm X 4 mm bh 40,000
. 180 cm X 105 cm X 4 mm bh 46,000
. 210 cm X 105 cm X 4 mm bh 52,000
. 240 cm X 105 cm X 4 mm bh 60,000
. 270 cm X 105 cm X 4 mm bh 68,000
. 300 cm X 105 cm X 4 mm bh 76,000
.(2,25x0,92 m) x 5 mm bh 65,000
(2,00x0,92 m) x 5 mm bh 57,700
NOK Jabes nok
. Kerpus Genteng bh
. Stel Besar bh
. Paten Besar bh
Nokstel gelombang harflex
. Stel Besar bh 31,400
. Patent Besar bh
. Plat besar bh

6 ASBES PLAT
. 100cm X 100 cm X 3 mm bh 17,300
. 100cm X 100 cm X 4 mm bh
. 50 cm X 200 cm X 3 mm bh
. 40 cm X 200 cm X 3 mm bh

7 FIBRE GLASS (JABES)


180 X 92 cm bh
200 X 92 cm bh
250 X 92 cm bh
180 X 105 cm bh
210 X 105 cm bh
250 X 105 cm bh
8 SENG PLAT
BJLS 0,18 lebar 55 cm m'
BJLS 0,20 lebar 55 cm m'
BJLS 0,20 lebar 90 cm m'
BJLS 0,20 lebar 120 cm m'
BJLS 0,28 lebar 55 cm lbr 33,000
BJLS 0,30 lebar 55 cm m'
BJLS 0,25 lebar 55 cm m'

CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)

BJLS 0,30 lebar 55 cm m'


BJLS 0,30 lebar 60 cm m' 23,900
BJLS 0,30 lebar 90 cm m' 34,700
9 SENG GELOMBANG
BJLS 0,18 panjang 180 cm lbr
BJLS 0,20 panjang 180 cm lbr 47,900
BJLS 0,30 panjang 180 cm lbr 59,500
BJLS 0,30 panjang 240 cm lbr 79,300
BJLS 0,40 panjang 180 cm lbr
Seng gelombang 3 x 6" BJLS.20, 2,4 x 0,8 lbr 50,400
10 ASPAL BITUMEN
Atap Onduvila lbr
Nok Onduvila lbr
Skrup pcs
Lisplank GRC 2/20 m'

III B A H A N K A Y U
1 JATI Papan m3
Balok/pesagen m3
Reng m3
Balok kelas II m3 13,537,100
Balok kelas III m3 11,454,500
Papan kelas II m3 14,578,500
Papan kelas III m3 12,495,800

2 KAMPER Papan m3 7,561,900


Balok/pesagen m3 7,318,100

3 KRUING Papan m3 5,800,000


Balok/pesagen m3 5,600,000

4 MERANTI Papan m3 4,600,000


Balok/pesagen m3 4,100,000
Papan Begesting m3

5 KAYU TAHUN BEKISPapan m3


Balok/pesagen m3 2,000,000

6 BENGKIRAI Papan m3 10,300,000


Balok/pesagen m3 9,300,000

7 SENGON Papan m3 3,000,000


Balok/pesagen m3 2,500,000

8 DOLKEN Sedang 8 - 10 x 400 cm bt 18,000


Kecil 6 - 7 x 400 cm bt

CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)

Besar 10 - 12 x 400 cm bt
Kayu cetakan m3
Kayu bakar m3
Bambu bt 13,200
Kayu list m'
Kayu list profil m'
Anyaman Bambu m2
Bilik Bambu m2 20,000
Reng bangkirai 2/3 m 3,300
Reng bangkirai m3 5,227,200
Reng jati 2/3 kelas III m 5,700
Reng jati kelas II m3 10,290,000
Reng jati kelas III m3 8,712,300
Kayu usuk bangkirai m3 8,500,000
Kayu usuk kruing m3 5,400,000
Reng Kamfer m3 5,800,000

IV BAHAN PENUTUP DINDING / LANTAI


1 UBIN (TEGEL BIASA)
PC polos 30 X 30 cm m2
20 X 20 cm m2
PC warna 30 X 30 cm m2
20 X 20 cm m2
Teraso 30 X 30 cm m2
2 TEGEL PLINT
PC warna 10 X 20 cm bh
PC abu-abu 15 x 20 bh

3 POLIS UBIN Lantai/badan m'


Plint m'
Trap m'

4 UBIN PORSELIN
Lokal 11 X 11 putih dos
11 X 11 warna dos
Lokal 15 X 15 putih dos
15 X 15 warna dos
5 MOZAIK PORSELIN
10 X 20 cm m2
15 X 15 cm m2
20 X 20 cm m2
20 X 25 cm m2

6 Keramik 30 X 30 cm polos m2 41,300


20 X 20 cm KM/WC m2 42,100
33 x 33 cm m2

CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)

25 x 25 cm m2
15 x 20 cm m2
Keramik anti slip 38,000
Keramik warna pola 30/30 m2 42,100
Keramik warna pola 40/40 m2 52,800
Keramik dinding 20/25 m2 44,600
Keramik dinding 20/20 m2 44,600
Keramik dinding list 5/20 bh 4,000
Keramik plin 10/20 bh 3,000
Karpet m2 110,000
7 Parquet Jati m2 160,000
Wallpaper m2 35,000
8 Batu Candi m2 99,100
Batu andesit m2 150,000
Batu andesit alur m2 170,000
9 Batu Tempel Hitam m2

10 GRANITO 40 x 40 cm m2 157,000
30 x 30 cm m2
11 Marmer m2 98,000

12 Keramik lantai 20/20 ex. KIA ( textur) m2


Keramik lantai 30/30 KW I ex. Mulia ( Polish ) m2
Keramik lantai 30/30 KW II ex. Mulia ( un polish ) m2
Keramik lantai 40/40 ex. Hercules m2
Keramik lantai 40/40 ex. Roman m2
Keramik lantai 60/60 ex. Hercules m2
Keramik lantai 60/60 ex. Roman m2
Keramik dinding 10/20 ex. KIA m2
Keramik dinding 20/20 ex. KIA m2
Keramik dinding 20/25 ex. KIA m2
Keramik dinding 25/40 ex. KIA m2
Marmer Tulungagung m2
Marmer lampung m2
Marmer Itali m2
Granito 60x60 polished ex. Innesa (lokal) m2
Granito 60x60 polished ex. Esenza (Import) m2
Batu palimanan lempeng potong pabrikasi m2
Batu candi m2 99,100
Batu andesit m2
Batu lempeng acak ( tidak beraturan) m2
Batu lempeng potong pabrikasi m2

13 Homogenous Tile 60/60 Ex. Indogress TPZ


Plint Homogenous Tile 10/60 Ex. Indogress TPZ
Step Nosing 10/30

CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)

V.BAHAN CETAK
1 BUIS BETON Ø 10 cm - 100 cm bh
Ø 20 cm - 100 cm bh 27,250
Ø 30 cm - 100 cm bh 42,100
Ø 40 cm - 100 cm bh 52,000
Ø 50 cm - 100 cm bh 77,650
Ø 60 cm - 100 cm bh 115,700
Ø 70 cm - 100 cm bh
Ø 80 cm - 100 cm bh
Ø 100 cm - 100 cm bh 229,700
Ø 80 cm - 50 cm bh 78,500
Ø 90 cm - 50 cm bh 86,700
Ø 100 cm - 50 cm bh 114,800
U 10 cm - 100 cm bh
U 15 cm - 100 cm bh
U 20 cm - 100 cm bh 37,150
U 30 cm - 100 cm bh 47,100
U 50 cm - 100 cm bh

2 LUBANG ANGIN (ROSTER) PC + PASIR


10 X 20 cm bh 6,000
20 X 20 cm bh
25 X 25 cm bh
30 X 30 cm bh
15 X 25 cm bh
15 X 30 cm bh

VI B A H A N B E S I
1 BESI BETON besi beton polos kg 10,000
besi beton prestress kg
besi beton ulir kg 10,000

2 BESI PLAT Besi Strip kg 4,100

3 BESI PROFIL Besi Profil kg 11,500


Besi Profil WF kg 14,800
4 JARING - JARING BAJA
Diameter 4 - 15 kg
Diameter 6 - 15 kg
M-8 (size 5,4 x 2,1 m2) lbr
Kawat Bronjong kg
5 BESI SIKU L 40 X 40 X 4 btg
L 50 X 50 X 5 btg
L 60 X 60 X 6 btg

CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)

L All Size kg 11,550

6 KAWAT - Ikat beton/bendrat kg 15,700


- Harmonika 12 X 45 mm m2
- Harmonika 12 X 24 mm m2
- Harmonika 14 X 30 mm m2
- Harmonika 14 X 35 mm m2
- Kawat Nyamuk Nylon m2
- Kawat Kasa m2
- Saringan pasir m2
- Kawat loket m2
- Kawat duri rol
- Kawat duri kg
- Kawat bronjong kg
- Kawat las kg 26,000

7 LAIN-LAIN
Paku asbes kg 23,100
Paku sekrup asbes bh 18,100
Paku crampon bh
Dynabolt ukuran 8 mm x 65 mm bh
Baut gording kg
Hollow Galvanis 2.4. 400 bt
Hollow Galvanis 4.4. 400 bt
Baja Ringan C.75 ex. Taso bt
Skrup Fixer bh 750
Sealant bh 50,000
Venetions Blinds atau Vertical Blinds (tirai) m2 95,000

VII B A H A N P I P A
1 Pipa PVC SII SCJ , S - 12,5 (10 bar)
Pipa PVC DN 20 ( ½" ) AW JIS btg 14,800
Pipa PVC DN 25 ( ¾" ) AW JIS btg 20,600
Pipa PVC DN 32 ( 1" ) AW JIS btg 28,900
Pipa PVC DN 40 ( 1½" ) btg 24,700
Pipa PVC DN 63 ( 2" ) btg 48,700
Pipa PVC DN 90 ( 3" ) btg -
Pipa PVC DN 110 ( 4" ) btg 152,800
Pipa PVC DN 160 ( 6" ) btg -
Pipa PVC DN 200 ( 8" ) btg -
Pipa PVC DN 250 ( 10" ) btg -
Pipa PVC DN 315 ( 12" ) btg -
Pipa PVC Ø 4" (AW - SCJ) 4 m 152,800
Pipa PVC Ø 2" (AW - SCJ) 4 m 48,700

CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)

Pipa PVC Ø 1 1/2" (AW - SCJ) 4 m 24,700


Pipa PVC Ø 1" (AW - SCJ) 4 m 28,900
Pipa PVC Ø 3/4" (AW - SCJ) 4 m 20,600
Pipa PVC Ø 1/2" (AW - SCJ) 4 m 14,800

2 Pipa Medium B Galvanis - SII


Pipa Medium B Galvanis DN ½" btg 89,200
Pipa Medium B Galvanis DN 25 ( ¾" ) btg 109,000
Pipa Medium B Galvanis DN 32 ( 1" ) btg 163,600
Pipa Medium B Galvanis DN 50 ( 1½" ) btg 287,600
Pipa Medium B Galvanis DN 63 ( 2" ) btg 361,900
Pipa Medium B Galvanis DN 2½" btg -
Pipa Medium B Galvanis DN 90 ( 3" ) btg 565,200
Pipa Medium B Galvanis DN 110 ( 4" ) btg 555,300
Pipa Medium B Galvanis DN 160 ( 6" ) btg 1,259,500
Pipa Medium B Galvanis DN 200 ( 8" ) btg
Pipa Medium B Galvanis DN 250 ( 10") btg

VIII B A H A N L A N G I T - L A N G I T
1 AKUSTIK-uk : 30 X 30 lbr
30 X 60 lbr
60 X 120 lbr
List Kayu Profil m' 6,600
2 SOFT BOARD-uk: 4'X 8' (1,2 x2,4 m2)
Gypsum tebal 9 mm lbr 60,000
Gypsum tebal 12 mm lbr
List Gypsum m'
Gypsum tebal 9 mm (120 x 240) lbr
lbr
lbr
lbr
lbr
Sekrup Gypsum bh
Compound zak
GRC Board lbr
Dinabolt Bh
Cotton Plaster bh
List Gypsum m'
Tepung Gypsum kg

Lisplank GRC 20 cm m1 16,250


Lisplank GRC 30 cm m2 22,500

3 HARD BOARD-uk: 4'X 8' (particle board) lbr

4 PLY WOOD

CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)

Teak wood
90 X 210 X 3 mm lbr
. 120 X 240 X 3 mm lbr 80,000
. 90 X 210 X 4 mm lbr 52,800
. 90 X 210 X 9 mm lbr
. 90 X 210 X 12 mm lbr
. 90 X 210 X 15 mm lbr
. 90 X 210 X 18 mm lbr
Tripleks
. 120 X 240 X 3 mm lbr 52,800
. 120 X 240 X 4 mm lbr 62,800
. 120 X 240 X 6 mm lbr
Multipleks
. 120 X 240 X 9 mm lbr 109,000
. 120 X 240 X 12 mm lbr 138,800
. 120 X 240 X 15 mm lbr
. 120 X 240 X 18 mm lbr
Formika ukuran pintu lbr 75,000

Harflex (1,2 x 2,4 m2 tb 5 mm) lbr


(1 x 1 m2 tb 5 mm) lbr
(0,9 x 1,8 m2 tb 5 mm) lbr
Eternit m2 17,300
GRC (1,2 x 2,4 m2 tb 4 mm) lbr
Plywood tebal 4 mm uk.90x220cm lbr 52,800
Plywood tebal 4 mm uk.120x240cm lbr 80,000
IX B A H A N F I N I S H I N G
1 KAYU
Menie kg 28,900
Dempul plamur kg 13,200
Ambril/amplas lbr 5,700
Batu Apung kg -
Cat dasar kg 62,800
. Emco kg -
. Yunior 66 (nippon paint) kg -
- Koas bh 7,400
. Deculux kg -
. Siralax ons -
. Spiritus ltr -
. Plitur jadi ltr 42,100
. Vernis ltr 42,100

2 TEMBOK
Kalkarium kg
Kapur sirih kg
Plamur kg 13,200

CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)

Cat Tembok ex. Nippon Weatherbond kg


Sintex 5 kg
Danabride 5 kg
Catylac 5 kg
Mowilex 5 kg
Alkali Tembok ex. Nippon 3-in 1 Anti-Alkali Primer Sealer kg
MOWILEX PRECOAT VARNISH BATU ALAM lt
Mowilex Clear Coating lt
Cat tembok kg 16,000

3 BESI
Menie kg 27,250
Cat mengkilat kg
Cat kg 50,000
Thinner A ltr
Minyak cat ltr 14,000
Thinner Super ltr
Residu (teer/aspal) drum 296,000
Fibre glass (tanki air)
kapasitas 550 liter. bh
kapasitas 1100 liter. bh
Lem Aica Aibon kg 15,700

X BAHAN KACA
1 POLOS 3 mm m2 57,000
5 mm m2 78,000
8 mm m2
12 mm m2

2 ES KABUR 3 mm m2
5 mm m2

3 RAY BAND 3 mm m2
5 mm m2 89,000
8 mm m2
12 mm m2

4 TEMPERED 12 mm m2

XI BAHAN INSTALASI LISTRIK


1 KABEL LISTRIK
NYA : . 1 X 1 1/2 mm2 m'
SPLN LMK 1 X 2 1/2 mm2 m'
1X4 mm2 m'
1X6 mm2 m'

CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)

NYY :. 2 X 1 1/2 mm2 m'


PRIMA 2 X 2 1/2 mm2 m'
2X4 mm2 m'
2X6 mm2 m'
3 X 1 1/2 mm2 m'
3 X 2 1/2 mm2 m'
3X4 mm2 m'
3X6 mm2 m'
NYM :. 2 X 1 1/2 mm2 m'
PRIMA 2 X 2 1/2 mm2 m'
2X4 mm2 m'
3 X 1 1/2 mm2 m'
3 X 2 1/2 mm2 m'
3X4 mm2 m'
3X6 mm2 m'

2 SKAKELAR
Out bauw . Seri bh
Engkel bh
In bauw . Seri bh
Engkel bh

3 FUSE BOX (SEKERING KASA)


1 group bh
2 group bh
3 group bh

4 STEKER - Biasa bh
Arde bh
T Biasa bh
T dengan Arde bh

5 FITING Flaon bh
Gantung bh
Kap bh
Kombinasi bh

6 STOP KONTAK - Arde Outbow putih bh


Arde Outbow hitam bh
Arde IB bh
Arde Putar bh

XII ALAT - ALAT PENGUNCI & PENGGANTUNG


1 KUNCI TANAM Union : 1 X slag bh
2 X slag bh
Yale : 1 X slag bh 49,500

CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)

2 X slag bh 131,400
Kuda : 1 X slag bh -
2 X slag bh 49,500
2 KUNCI SLOOD -
Sekelas Kuda Terbang bh 49,500
Sekelas Anchor bh 156,100
Kunci Lemari bh 5,000
2 ENGSEL DAN GERENDEL
Engsel Angin bh
Kupu-kupu biasa bh 8,200
Nylon kupu-kupu bh -
Espagnoled - dalam negeri bh -
Grendel Tanam luar negeri bh -
Grendel biasa bh 3,300
Kait Angin bh 2,400
Door Stop bh

XIIIBAHAN SANITAIR
1 KLOSET DUDUK bh 961,900
2 KLOSET JONGKOK bh 125,600
3 WASTAFEL PEDESTAL bh -
4 WASTAFEL MEJA OVAL bh -
5 WASTAFEL GANTUNG BULAT bh 261,900
6 WASTAFEL GANTUNG SUDUT bh -
7 WASTAFEL GANTUNG SUDUT KECIL bh -
8 WASTAFEL BAK CUCI bh -
9 TEMPAT SABUN GANTUNG bh -
10 TEMPAT SABUN TANAM bh -
URINOIR KERAMIK STANDART bh 1,151,200
BAK MANDI FIBRE GLASS 70.70.80 bh 261,900
11 SEPTIC TANK (ETERNIT GRESIK) -
5 Pemakai 500 liter unit -
10 Pemakai 1.000 liter unit -
12 LAIN - LAIN -
Kran Air 1/2" bh -
Kran Air 3/4" bh 19,800
Seal tape bh 3,300
Floor drain bh 3,300
Roof drain kuningan
Bak Cuci Piring bh 230,500
Water drain bh 50,000

XIV ALAT PENGIKAT KAYU


1 PAKU - ukuran 1" s/d 4" kg 14,000
2 PAKU - payung kg
3 PAKU - sekrup kg 18,100

CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)

4PAKU - beton kg
5MUR BAUT (kuda-kuda) kg
6ANGKUR BAUT bh
7LEM KAYU bh 15,700
8Tali Ijuk kg 2,000
Paku Pancing 60 x 230 kg 15,500
XV POMPA AIR
1 POMPA AIR TANGAN
Dragon buatan Indonesia bh
2 POMPA AIR LISTRIK
Sanyo 100 watt bh
Fuji 250 watt bh
Shimizu . 100 watt bh
. 90 watt bh
Dab . 125 watt bh
. 175 watt bh

XVI PAVING BLOCK


1 SQUARE Abu-abu m2
Merah/hitam m2
2 HOLLAND Abu-abu m2
Merah/hitam m2
3 UNIDECOR Abu-abu m2
Merah/hitam m2
4 UNI Abu-abu m2
Merah/hitam m2
5 TRIHEX Abu-abu m2
Merah/hitam m2
6 OLYMPIA HEXA Abu-abu m2
7 HEXAGONAL Abu-abu m2
Merah/hitam m2
8 CASTLE Abu-abu m2
9 TRAPEZ Abu-abu m2
10 TRAPEZ GRASS BLOCK
Abu-abu m2
11 STANDARD GRASS BLOCK ABU-ABU BH
12 BATACO BH 2,400
13 KANSTEEN m' -
14 Paving block natural 6 cm ( K- 175 ) m2 37,100
15 Paving block natural 8 cm ( K-175 ) m2 49,500
16 Paving block warna 6 cm ( K- 175 ) m2 -
17 Paving block warna 8 cm ( K-175 ) m2 -
Paving abu-abu tebal 6 cm m2 37,100
Paving abu-abu tebal 8 cm m2 49,500
Paving abu-abu K.250 tebal 6 cm m2 60,000
Paving abu-abu K.250 tebal 8 cm m2 80,000

CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)

Paving abu-abu K.300 tebal 6 cm m2 65,000


Paving abu-abu K.300 tebal 8 cm m2 86,000

MASTER BETON BOYOLALI (Pricelist 01 Oktober 2014)


1 Paving Block Holland 6 cm K-200-250 Natural bh
2 Paving Block Holland 6 cm K-250-300 Natural bh
3 Paving Block Holland 6 cm K-350-400 Natural bh
4 Paving Block Holland 8 cm K-250-300 Natural bh
5 Paving Block Holland 8 cm K-350-400 Natural bh
6 Paving Block Holland 10 cm K-450-500 Natural bh
7 Paving Block Kubus 6 cm K-250-300 Natural bh
8 Paving Block Kubus 8 cm K-250-300 Natural bh
9 Paving Block Kubus 8 cm K-350-400 Natural bh
10 Paving Block Segi Enam 6 cm K-200-250 Natural bh
11 Paving Block Segi Enam 6 cm K-250-300 Natural bh
12 Paving Block Segi Enam 6 cm K-350-400 Natural bh
13 Topi Uskup Besar 6 cm Natural bh
14 Grass Block Kotak 8cm Natural bh
15 Paving Block Holland 6 cm K-200-250 Warna bh
16 Paving Block Holland 6 cm K-250-300 Warna bh
17 Paving Block Holland 6 cm K-350-400 Warna bh
18 Paving Block Holland 8 cm K-250-300 Warna bh
19 Paving Block Holland 8 cm K-350-400 Warna bh
20 Paving Block Holland 10 cm K-450-500 Warna bh
21 Paving Block Kubus 6 cm K-250-300 Warna bh
22 Paving Block Kubus 8 cm K-250-300 Warna bh
23 Paving Block Kubus 8 cm K-350-400 Warna bh
24 Paving Block Segi Enam 6 cm K-200-250 Warna bh
25 Paving Block Segi Enam 6 cm K-250-300 Warna bh
26 Paving Block Segi Enam 6 cm K-350-400 Warna bh
27 Topi Uskup Besar 6 cm Warna bh
28 Grass Block Kotak 8cm Warna bh
29 Kansteen bh

ALDAS MUNTILAN (Pricelist 15 Februari 2014)


1 Paving Block Holland uk. 10,5 x 21 tb. 6 cm K-300 Natural bh
2 Paving Block Holland uk. 10,5 x 21 tb. 8 cm K-300 Natural bh
3 Paving Block Holland uk. 10,5 x 21 tb. 6 cm K-250 Natural bh
4 Paving Block Unipave uk. 11 x 22 tb. 8 cm K-300 Natural bh
5 Topi Uskup Kecil tb. 6 cm Natural bh
6 Topi Uskup Kecil tb. 8 cm Natural bh
4 Kanstin Standard uk. 10/12,5 x 30 x 50 K-300 bh
5 Kanstin Lubang uk. 10/12,5 x 30 x 50 K-300 bh
6 Kanstin Standard uk. 15/20 x 30 x 50 K-300 bh
7 Kanstin Lubang uk. 15/20 x 30 x 50 K-300 bh
8 Kanstin Standard uk. 18/21 x 30 x 50 K-300 bh

CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)

9 Kanstin Lubang uk. 18/21 x 30 x 50 K-300 bh


10 Grassblock Lubang Kotak uk. 10 x 40 x 40 bh
11 Grassblock Lubang Bulat uk. 10 x 48 x 48 bh

XVII LAIN -LAIN


1 KREI 25 MM m2
2 Sliding Pintu J4 bh
3 Naco rayban 5 mm per Daun bh 82,000
Naco bening 5 mm per Daun bh 91,000
4 Rolling door Besi m2 285,000
Rolling door Almunium m2 443,000
5 Awning Almunium m2
6 Kusen Almunium 4" Putih m' 73,500
7 Kusen Almunium 4" Coklat m' 78,500
7 WIDE FLANGE BEAM
150 X 75 X 5 X 7 X 12 btg
Besi Holo rangka gypsum m1 6,250
8 ASPAL.
Aspal Ex Pertamina isi Net 160 kg drum

Hotmix Tebal = 4 Cm m2
Hotmix Tebal = 5 Cm m2
Hotmix Tebal = 6 Cm m2
Hotmix Tebal = 7 Cm m2
Binder Course ton
Wearing Course ton
Hot Roller Sheet ton
Sand Sheet ton
Sand Sheet Emulsi ton
Cold Mix ton
Prime / Tack Coard RC liter
Prime Coat MC liter
Prime / Tack Coat Emulsi liter
10 K A C A
Cermin tebal 5 mm m2

11 PAGAR BRC. Pagar BRC 90 A2 /lb


Pagar BRC 120 A2 /lb
12 LAIN-LAIN
Minyak Beton & bekisting ltr 14,000
Pintu Lipat Besi 0.8 mm m2 545,400
Sunscreen Allumunim m2 -
Allumunium Foil m2 -
Soda api kg 27,200
Sabun kg

CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)

Air m3 72,500
Koas Alang-alang ikat
Solar (Industri) ltr 6,400
Premium (Industri) ltr 6,700
Pelumas ltr 15,700
Vynil 30 x 30 cm bh

13 WATER PROOFING 5 kg
5 kg
20 Ltr

XVIII BAHAN ALUMUNIUM


1 Alumunium Profil Warna Silver 4" tebal 1.2 mm m' 73,500
Warna Coklat 4" tebal 1.2 mm m' 78,500
Alumunium Coating White 4" tbl 1.2 mm m'

2 Aksesoris Engsel 4" bh


Engsel 3" bh
Cesement 16" set
Kait Angin bh
Rambuncis bh
Sealant tube
Skrup Fixer bh
Profil Kaca m'
Handle Pintu + Kunci set
Spagnolet Tanam bh
Door Closer set
Spandek PVC m2
Sindik Pintu bh
Floor Hinge Ex. Dekson set
Patch Fitting bh
Pull Handle set

CK Boyolali
HARGA HARGA HARGA INDEX
HARGA INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp) (Rp) (Rp)

0.00
0.00 229,000.00
190,000.00 157,020.00 239,000.00 159,000
190,000.00 157,020.00 260,000.00 142,000
200,000.00 165,280.00 135,000.00
200,000.00 163,880.00 200,000.00 240,000
94,210.00 110,000.00 114,000
69,580.00 0.00 102,000
83,960.00 240,000.00 123,000
177,560.00 230,000.00 260,000
170,240.00 215,000.00 250,000
0.00 0.00
0.00 0.00
530.00 760 700
0.00 3400
0.00 3920
0.00 3700
0.00 3700
0.00
86,770.00 125000 102,000
185,000.00 152,890.00 210000 159,000
152,890.00 224000 159,000
35,120.00 72000 52,000
0.00 0
0.00 112000
163,630.00 275000 240,000
0.00 0
0.00
51,230.00 63200 62,000
51,230.00 0 62,000
0.00 0
0.00 0
0.00 0
1,100.00 1580 1,625
0.00 112000
0.00 140000
1,450.00 13500 13,500
0.00

CK Boyolali
HARGA HARGA HARGA INDEX
HARGA INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp) (Rp) (Rp)
0.00
0.00 728000
0.00 42790
0.00
0.00
0.00 0
0.00 0
0.00 0
4,040.00 0 6,000
0.00 0
0.00 0
0.00 6280
0.00 6720
1,980.00 3,000
0.00
0.00
330.00 0 400
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
1,900.00 0 3,000
4,000.00 6,000
4,700.00 7,000
4,700.00 7,000
1250
2250
3600
2580
10640
9860
4480
7280
25200
1,500.00 2,200
1,400.00 2,100
1,100.00 1,800
1,100.00 1,700
0.00
0.00
0.00 0
0.00 0
0.00 0
0.00 0
0.00

CK Boyolali
HARGA HARGA HARGA INDEX
HARGA INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp) (Rp) (Rp)
0.00
0.00 79300
0.00 0
0.00 105800
0.00 0
0.00 0
0.00 0
0.00 0
33,050.00 0
38,010.00 53800
42,970.00 0
49,580.00 72800
56,190.00 0
62,800.00 0
53,710.00
47,680.00
0.00
0.00 0
0.00 0
0.00 0
0.00
25,950.00 0 38,000
0.00 0
0.00 0
0.00
0.00
14,290.00 0 21,000 17,300
0.00 0 -
0.00 0 -
0.00 0 -
0.00 -
0.00 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 -
0.00 0 -
0.00 25200 -
0.00 35300 -
0.00 53800 -
27,270.00 0 40,000 33,000
0.00 0 -
0.00 -

CK Boyolali
HARGA HARGA HARGA INDEX
HARGA INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp) (Rp) (Rp)
0.00 -
19,750.00 29,000 23,900
28,670.00 42,000 34,700
0.00 -
0.00 0 -
39,580.00 0 58,000 47,900
49,170.00 42600 72,000 59,500
65,530.00 58300 96,000 79,300
0.00 0 -
41,650.00 -
0.00 -
0.00 50000 -
0.00 75000 -
0.00 800 -
0.00 20000 -
0.00 -
0.00 -
0.00 26280000 -
0.00 23968000 -
0.00 21400000 -
11,187,680.00 16,380,000 13,537,100
9,466,520.00 13,860,000 11,454,500
12,048,340.00 17,640,000 14,578,500
10,327,100.00 15,120,000 12,495,800
0.00 -
6,249,500.00 9800000 9,150,000 7,561,900
6,048,010.00 9072000 8,855,000 7,318,100
0.00 -
4,793,380.00 6498000 7,337,000 6,063,600
4,628,090.00 5936000 9,244,000 7,639,600
0.00 -
3,801,650.00 5600000 6,325,000 5,227,200
3,388,420.00 5152000 5,693,000 4,704,900
0.00 3304000 -
0.00 -
0.00 3696000 -
1,652,890.00 3136000 2,530,000 2,090,900
0.00 -
8,512,390.00 12880000 11,845,000 9,789,200
7,685,950.00 11760000 10,925,000 9,028,900
0.00 -
2,479,330.00 3696000 3,795,000 3,136,300
2,066,110.00 3136000 3,163,000 2,614,000
0.00 -
14,870.00 20000 20,000 18,000
0.00 16000 -

CK Boyolali
HARGA HARGA HARGA INDEX
HARGA INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp) (Rp) (Rp)
0.00 25000 -
0.00 0 -
0.00 812000 -
10,900.00 14200 16,000 13,200
0.00 33750 -
0.00 9700 -
0.00 26900 -
16,520.00 -

0.00 -
0.00 -
0.00 40320 -
0.00 31360 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 -
0.00 0 -
0.00 0 -
0.00 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 -
0.00 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 -
34,130.00 50400 50,000 41,300
34,790.00 0 51,000 42,100
0.00 0 -

CK Boyolali
HARGA HARGA HARGA INDEX
HARGA INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp) (Rp) (Rp)
0.00 0 -
0.00 0 -
31,400.00 46,000 38,000
34,790.00 51,000 42,100
43,630.00 64,000 52,800
36,850.00 54,000 44,600
36,850.00 54,000 44,600
3,300.00
2,470.00
90,900.00
132,230.00 0 -
28,920.00 -
81,900.00 0 -
123,960.00 -

0.00 0 -
0.00 -
129,750.00 0 190,000 157,000
0.00 0 -
80,990.00 107520 107,520 97,745
0.00 -
0.00 60480 -
0.00 50400 -
0.00 58240 -
0.00 68320 -
0.00 90720 -
0.00 78400 -
0.00 98560 -
0.00 49280 -
0.00 57120 -
0.00 62720 -
0.00 72800 -
0.00 107520 -
0.00 85120 -
0.00 924000 -
0.00 284480 -
0.00 470400 -
0.00 154560 -
81,900.00 143360 120,000 99,100
0.00 201600 -
0.00 61600 -
0.00 154560 -
0.00 -
0.00 175000 -
0.00 15000 -
0.00 23000 -

CK Boyolali
HARGA HARGA HARGA INDEX
HARGA INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp) (Rp) (Rp)
0.00 -
0.00 -
0.00 -
0.00 0 -
22,520.00 39200 33,000 27,200
34,790.00 56000 51,000 42,100
42,970.00 67200 63,000 52,000
64,170.00 75100 94,000 77,600
95,610.00 0 140,000 115,700
0.00 0 -
0.00 100800 -
189,830.00 134100 278,000 229,700
64,870.00 95,000 78,500
71,650.00 105,000 86,700
94,870.00 139,000 114,800
0.00 0 -
0.00 0 -
30,700.00 37000 45,000 37,100
38,920.00 42600 57,000 47,100
0.00 0 -
0.00 -
0.00 -
4,950.00 0 6,000 4,900
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 -
0.00 -
8,260.00 10650 11,000 9,000
0.00 0 -
8,260.00 10650 11,000 9,000
0.00 -
3,380.00 10650 5,000 4,100
0.00 -
9,500.00 12900 14,000 11,500
12,230.00 18,000 14,800
0.00 -
0.00 0 -
0.00 0 -
0.00 616000 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -

CK Boyolali
HARGA HARGA HARGA INDEX
HARGA INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp) (Rp) (Rp)
9,540.00 13900 14,000 11,500
0.00 -
12,970.00 16800 19,000 15,700
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 17250 -
0.00 16000 -
21,480.00 32,000 26,400
0.00 -
0.00 -
19,090.00 23600 28,000 23,100
14,950.00 650 22,000 18,100
0.00 1750 -
0.00 1600 -
0.00 12600 -
0.00 21300 -
0.00 28000 -
0.00 75000 -
610.00 -

0.00 -
0.00 -
0.00 -
12,230.00 0 18,000 14,800
17,020.00 0 25,000 20,600
23,880.00 0 35,000 28,900
20,410.00 0 30,000 24,700
40,240.00 0 59,000 48,700
0.00 0 -
126,280.00 0 185,000 152,800
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
126,280.00 185,000 152,800
40,240.00 59,000 48,700

CK Boyolali
HARGA HARGA HARGA INDEX
HARGA INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp) (Rp) (Rp)
20,410.00 30,000 24,700
23,880.00 35,000 28,900
17,020.00 25,000 20,600
12,230.00 18,000 14,800
0.00 -
0.00 -
73,710.00 0 108,000 89,200
90,080.00 0 132,000 109,000
135,200.00 0 198,000 163,600
237,680.00 0 348,000 287,600
299,090.00 0 438,000 361,900
0.00 0 -
467,100.00 0 684,000 565,200
458,920.00 0 672,000 555,300
1,040,900.00 0 1,524,000 1,259,500
0.00 0 -
0.00 0 -
0.00 -
0.00 -
0.00 0 -
0.00 0 -
0.00 0 -
5,450.00 9700 8,000 6,600
0.00 -
49,580.00 67968 76,000 62,800
0.00 84096 -
0.00 9000 -
0.00 80000 -
0.00 75000 -
0.00 75000 -
0.00 65000 -
0.00 65000 -
0.00 12.57142857 -
0.00 75000 -
0.00 68000 -
0.00 7200 -
0.00 15000 -
0.00 8500 -
0.00 12500 -
0.00 -
13,420.00 -
18,590.00
0.00 -
0.00 0 -
0.00 -
0.00 -

CK Boyolali
HARGA HARGA HARGA INDEX
HARGA INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp) (Rp) (Rp)
0.00 -
0.00 0 -
66,110.00 0 -
43,630.00 0 64,000 52,800
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 -
43,630.00 50400 64,000 52,800
51,900.00 67200 76,000 62,800
0.00 84000 -
0.00 -
90,080.00 128800 132,000 109,000
114,710.00 168000 168,000 138,800
0.00 0 -
0.00 0 -
61,980.00 0 -
0.00 -
0.00 85200 -
0.00 34800 -
0.00 46000 -
14,290.00 15700 21,000 17,300
0.00 66100 -
43,630.00 -

0.00 -
0.00 -
1.98 23,880.00 33600 35,000 28,900
2.88 10,900.00 23600 16,000 13,200
0.6875 4,710.00 9600 7,000 5,700
36,300 0.00 22400 -
51,900.00 0 76,000 62,800
0.00 0 -
0.00 0 -
6,110.00 0 9,000 7,400
0.00 58300 -
0.00 39200 -
0.00 18000 -
34,790.00 0 51,000 42,100
34,790.00 0 51,000 42,100
0.00 -
0.00 -
0.00 0 -
0.00 0 -
10,900.00 23600 16,000 13,200

CK Boyolali
HARGA HARGA HARGA INDEX
HARGA INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp) (Rp) (Rp)
0.00 80640 -
0.00 0 -
0.00 0 -
0.00 112500 -
0.00 0 -
0.00 67200 -
0.00 67200 -
0.00 64960 -
13,220.00 21,000 17,300
0.00 -
0.00 -
22,520.00 33600 35,000 28,900
0.00 58300 -
41,320.00 0 76,000 62,800
0.00 23600 -
11,570.00 25200 17,000 14,000
0.00 0 -
244,620.00 0 360,000 297,500
0.00 -
0.00 0 -
0.00 0 -
12,970.00 0 19,000 15,700
0.00 -
0.00 -
47,100.00 0 70,000 57,800
64,460.00 60500 95,000 78,500
0.00 69500 -
0.00 106400 -
0.00 -
0.00 0 -
0.00 79600 -
0.00 -
0.00 0 -
73,550.00 68900 82,000 67,700
0.00 74500 -
0.00 117600 -
0.00 -
0.00 1200000 -
0.00 -
0.00 -
0.00 -
0.00 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -

CK Boyolali
HARGA HARGA HARGA INDEX
HARGA INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp) (Rp) (Rp)
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 -
0.00 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 -
0.00 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 -
0.00 -
0.00 0 -
0.00 0 -
40,900.00 0 60,000 49,500

CK Boyolali
HARGA HARGA HARGA INDEX
HARGA INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp) (Rp) (Rp)
108,590.00 0 159,000 131,400
0.00 0 -
40,900.00 67200 60,000 49,500
0.00 -
40,900.00 60,000 49,500
129,000.00 189,000 156,100
4,130.00 -
0.00 -
0.00 0 -
6,770.00 0 10,000 8,200
0.00 0 -
0.00 0 -
0.00 0 -
2,720.00 0 4,000 3,300
1,980.00 0 3,000 2,400
0.00 0 -
0.00 -
0.00 -
794,950.00 2184000 1,164,000 961,900
103,800.00 129000 152,000 125,600
0.00 0 -
0.00 0 -
216,440.00 0 317,000 261,900
0.00 278000 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
951,400.00 1,393,000 1,151,200
216,440.00 317,000 261,900
0.00 -
0.00 0 -
0.00 0 -
0.00 -
0.00 17000 -
16,360.00 29500 24,000 19,800
2,720.00 3400 4,000 3,300
2,720.00 56000 4,000 3,300
0.00 79000 -
190,490.00

0.00 -
0.00 -
11,570.00 14600 17,000 14,000
0.00 0 -
14,950.00 0 22,000 18,100

CK Boyolali
HARGA HARGA HARGA INDEX
HARGA INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp) (Rp) (Rp)
0.00 0 -
0.00 0 -
0.00 0 -
12,970.00 0 19,000 15,700
1,650.00 2500 2,500 2,000
12,800.00 -
0.00 -
0.00 -
0.00 0 -
0.00 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 -
0.00 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 -
0.00 0 -
0.00 0 -
1,980.00 0 3,000 2,400
0.00 0 -
30,660.00 58240 45,000 37,100
40,900.00 91840 60,000 49,500
0.00 69440 -
0.00 103040 -
30,660.00 45,000 37,100
40,900.00 60,000 49,500
49,580.00 68,000 56,100
66,110.00 80,000 66,100

CK Boyolali
HARGA HARGA HARGA INDEX
HARGA INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp) (Rp) (Rp)
53,710.00 77,000 63,600
71,070.00 90,000 74,300
0.00 -
0.00 -
0.00 1270 -
0.00 1460 -
0.00 1580 -
0.00 2180 -
0.00 2450 -
0.00 3320 -
0.00 2810 -
0.00 3840 -
0.00 4310 -
0.00 2170 -
0.00 2510 -
0.00 2720 -
0.00 3280 -
0.00 7310 -
0.00 1510 -
0.00 1730 -
0.00 1880 -
0.00 2450 -
0.00 2710 -
0.00 3640 -
0.00 3320 -
0.00 4310 -
0.00 4770 -
0.00 2590 -
0.00 2970 -
0.00 3220 -
0.00 4330 -
0.00 8340 -
0.00 26910 -
0.00 -
0.00 -
0.00 1860 -
0.00 2570 -
0.00 1690 -
0.00 2890 -
0.00 1250 -
0.00 2460 -
0.00 30360 -
0.00 36960 -
0.00 47520 -
0.00 52800 -
0.00 58080 -

CK Boyolali
HARGA HARGA HARGA INDEX
HARGA INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp) (Rp) (Rp)
0.00 55440 -
0.00 16050 -
0.00 23120 -
0.00 -
0.00 -
0.00 -
0.00 0 -
0.00 0 -
67,760.00 0 82,000 67,700
75,200.00 0 91,000 75,200
235,530.00 0 285,000 235,500
366,110.00 0 443,000 366,100
0.00 0 -
60,740.00 0 72,000 59,500
64,870.00 0 78,000 64,400
0.00 -
0.00 0 -
5,160.00 -
0.00 -
0.00 0 -
0.00 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 -
0.00 0 -
0.00 -
0.00 0 -
0.00 0 -
0.00 -
11,570.00 6000 17,000 14,000
450,740.00 0 660,000 545,400
0.00 0 -
0.00 8580 -
22,470.00 0 33,000 27,200
0.00 0 -

CK Boyolali
HARGA HARGA HARGA INDEX
HARGA INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp) (Rp) (Rp)
59,910.00 80000 80,000 66,100
0.00 0 -
5,280.00 0 6,400 5,200
5,530.00 0 6,700 5,500
12,970.00 0 19,000 15,700
0.00 0 -
0.00 -
0.00 78500 -
0.00 71000 -
0.00 525000 -
0.00 -
0.00 -
60,740.00 85000 72,000 59,500
64,870.00 108000 78,000 64,400
0.00 102000 -
0.00 -
0.00 28000 -
0.00 25500 -
0.00 75000 -
0.00 30000 -
0.00 35000 -
0.00 35000 -
0.00 600 -
0.00 6000 -
0.00 250000 -
0.00 25000 -
0.00 455000 -
0.00 55000 -
0.00 15000 -
0.00 1490000 -
0.00 637000 -
0.00 260000 -
0.00 -
-

CK Boyolali
HARGA SURVEI I HARGA SURVEI II INTERNET (Rp)
(Rp) (Rp)

REAL PLUS PPN

530.00

CK Boyolali
HARGA SURVEI I HARGA SURVEI II INTERNET (Rp)
(Rp) (Rp)

40000 44000
46000 50600
52000 57200
60000 66000
68000 74800
132000 110000 76000 83600

CK Boyolali
HARGA SURVEI I HARGA SURVEI II INTERNET (Rp)
(Rp) (Rp)

6,000,000.00
6,000,000.00

9,500,000.00
9,500,000.00

CK Boyolali
HARGA SURVEI I HARGA SURVEI II INTERNET (Rp)
(Rp) (Rp)

42,000.00 40,000.00
49,000.00 48,000.00

CK Boyolali
HARGA SURVEI I HARGA SURVEI II INTERNET (Rp)
(Rp) (Rp)

55000
45,000.00 43000
47,000.00 45000
49,000.00 48000
49,000.00 49000

CK Boyolali
HARGA SURVEI I HARGA SURVEI II INTERNET (Rp)
(Rp) (Rp)

50,000.00
60,000.00
65,000.00
75,000.00
85,000.00

90,000.00
100,000.00

27,500.00
35,000.00

9,500.00

9,500.00

CK Boyolali
HARGA SURVEI I HARGA SURVEI II INTERNET (Rp)
(Rp) (Rp)

14,000.00

20,000.00 15,000.00
35000

160000

CK Boyolali
HARGA SURVEI I HARGA SURVEI II INTERNET (Rp)
(Rp) (Rp)

29000
22000
20000
18000

59,000.00

CK Boyolali
HARGA SURVEI I HARGA SURVEI II INTERNET (Rp)
(Rp) (Rp)

50,000.00
60,000.00

100,000.00
140,000.00

15,000.00

26,000.00
29,000.00 28,000.00

45,000.00 50,000.00

CK Boyolali
HARGA SURVEI I HARGA SURVEI II INTERNET (Rp)
(Rp) (Rp)

19,000.00 18,000.00

29,000.00

10000 20000

55,000.00
65,000.00

75,000.00

CK Boyolali
HARGA SURVEI I HARGA SURVEI II INTERNET (Rp)
(Rp) (Rp)

65,000.00

10,000.00 10,000.00

5000
5,000.00

600,000.00 650,000.00
145,000.00 140,000.00

350,000.00

15,000.00 15,000.00

12,000.00

CK Boyolali
HARGA SURVEI I HARGA SURVEI II INTERNET (Rp)
(Rp) (Rp)

13000 13000

24

CK Boyolali
DAFTAR HARGA SATUAN BAHAN BANGUNAN

PEKERJAAN : -
LOKASI : -
TAHUN ANGGARAN : -

HARGA
NO. J E N I S B A H A N SATUAN (Rp)

I BAHAN DASAR
1 BATU KALI Bulat Utuh m3
Bulat Belah m3 230,000
Pecah 10/15 m3 230,000
Pecah 5/7 m3 242,000
Pecah 3/5 m3 242,000
2 KERIKIL Timbunan Pilihan m3 114,000
Sawur / Koral m3 102,000
Beton 0,5/1 m3 123,000
Beton 1/2 m3 260,000
Beton 2/3 m3 250,000
Biasa m3
Tras Giling m3
3 BATU BATA ex lokal bh 700
Concrete Blok (CB 15) / Batako (Lubang2) bh
Batako Padat bh
Rosteer beton cetak 12 x 11 x 24 cm bh
Rosteer tanah liat bakar 12 x 11 x 24 cm bh

4 PASIR Urug m3 102,000


Pasang m3 159,000
Beton m3 159,000
5 TANAH Padas m3 52,000
Liat m3
Subur m3
6 KAPUR Pasang m3 240,000
Semen Merah m3
7 PORTLAND CEMENT
Gresik 40 kg zak 62,000
Holcim 40 kg zak 62,000
Holcim 50 kg zak
Cibinong 40 kg zak
Cibinong 50 kg zak
Portland Cement kg 1,625
Semen Putih 40 kg zak
Semen Putih 50 kg zak
Semen warna kg 13,500

CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)

II B A H A N P E N U T U P A T A P
1 SIRAP (100 lbr) pak
Sirap asbes semen m2

2 GENTENG BETON
Genteng Beton Warna standard bh
Genteng Beton Warna Special bh
Genteng Beton Warna Khusus bh
Kerpus Beton Warna Standard bh 6,000
Kerpus Beton Warna Special bh
Kerpus Beton Warna Khusus bh
Genteng beton ex. Mutiara bh
Genteng beton flat ex. Mutiara bh
Genteng press beton polos tipe nusantara 3,000

3 GENTENG TANAH LIAT


Vlaam bh 400
Kodok bh
Kodok Glasur bh
Nok kerpus Kodok bh
Nok kerpus Kodok Glasur bh
Plentong super besar 18 bh/m2 bh
Nok kerpus plentong super bh 3,000
Kerpus press beton 6,000
Kerpus press mantili 7,000
Kerpus press tipe soka kebumen 7,000
Genteng lokal tipe plenthong
Genteng kebumen tipe plentong kecil
Genteng kebumen tipe morando
Genteng kebumen tipe kodok
Genteng keramik ex. Kanmuri
Genteng keramik ex. KIA KW I
Genteng kerpus lokal
Genteng kerpus kebumen
Genteng kerpus keramik
Genteng soka kebumen plentong besar 2,200
Genteng soka kebumen plentong kecil 2,100
Genteng press mantili besar 1,800
Genteng press mantili kecil 1,700

4 GENTENG KACA
Vlaam tebal 2 mm bh
Vlaam tebal 3 mm bh
Kodok tebal 2 mm bh
Kodok tebal 3 mm bh

CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)

5 ASBES GELOMBANG BESAR


. 200 cm X 102 cm X 5 mm bh
. 225 cm X 102 cm X 5 mm bh
. 250 cm X 102 cm X 5 mm bh
. 200 cm X 102 cm X 6 mm bh
. 225 cm X 102 cm X 6 mm bh
. 250 cm X 102 cm X 6 mm bh
Asbes Gelombang Kecil
. 150 cm X 105 cm X 4 mm bh 44,000
. 180 cm X 105 cm X 4 mm bh 50,600
. 210 cm X 105 cm X 4 mm bh 57,200
. 240 cm X 105 cm X 4 mm bh 66,000
. 270 cm X 105 cm X 4 mm bh 74,800
. 300 cm X 105 cm X 4 mm bh 103,000

NOK Jabes nok


. Kerpus Genteng bh
. Stel Besar bh
. Paten Besar bh
Nokstel gelombang harflex
. Stel Besar bh 38,000
. Patent Besar bh
. Plat besar bh

6 ASBES PLAT
. 100cm X 100 cm X 3 mm bh 21,000
. 100cm X 100 cm X 4 mm bh
. 50 cm X 200 cm X 3 mm bh
. 40 cm X 200 cm X 3 mm bh

7 FIBRE GLASS (JABES)


180 X 92 cm bh
200 X 92 cm bh
250 X 92 cm bh
180 X 105 cm bh
210 X 105 cm bh
250 X 105 cm bh
8 SENG PLAT
BJLS 0,18 lebar 55 cm m'
BJLS 0,20 lebar 55 cm m'
BJLS 0,20 lebar 90 cm m'
BJLS 0,20 lebar 120 cm m'
BJLS 0,28 lebar 55 cm lbr 40,000
BJLS 0,30 lebar 55 cm m'
BJLS 0,25 lebar 55 cm m'
BJLS 0,30 lebar 55 cm m'

CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)

BJLS 0,30 lebar 60 cm m' 29,000


BJLS 0,30 lebar 90 cm m' 42,000
9 SENG GELOMBANG
BJLS 0,18 panjang 180 cm lbr
BJLS 0,20 panjang 180 cm lbr 58,000
BJLS 0,30 panjang 180 cm lbr 72,000
BJLS 0,30 panjang 240 cm lbr 96,000
BJLS 0,40 panjang 180 cm lbr

10 ASPAL BITUMEN
Atap Onduvila lbr
Nok Onduvila lbr
Skrup pcs
Lisplank GRC 2/20 m'

III B A H A N K A Y U
1 JATI Papan m3
Balok/pesagen m3
Reng m3
Balok kelas II m3 16,380,000
Balok kelas III m3 13,860,000
Papan kelas II m3 17,640,000
Papan kelas III m3 15,120,000

2 KAMPER Papan m3 9,150,000


Balok/pesagen m3 8,855,000

3 KRUING Papan m3 7,337,000


Balok/pesagen m3 9,244,000

4 MERANTI Papan m3 6,325,000


Balok/pesagen m3 5,693,000
Papan Begesting m3

5 KAYU TAHUN BEKISPapan m3


Balok/pesagen m3 2,530,000

6 BENGKIRAI Papan m3 11,845,000


Balok/pesagen m3 10,925,000

7 SENGON Papan m3 3,795,000


Balok/pesagen m3 3,163,000

8 DOLKEN Sedang 8 - 10 x 400 cm bt 20,000


Kecil 6 - 7 x 400 cm bt
Besar 10 - 12 x 400 cm bt

CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)

Kayu cetakan m3
Kayu bakar m3
Bambu bt 16,000
Kayu list m'
Kayu list profil m'
Anyaman Bambu m2

IV BAHAN PENUTUP DINDING / LANTAI


1 UBIN (TEGEL BIASA)
PC polos 30 X 30 cm m2
20 X 20 cm m2
PC warna 30 X 30 cm m2
20 X 20 cm m2
Teraso 30 X 30 cm m2
2 TEGEL PLINT
PC warna 10 X 20 cm bh
PC abu-abu 15 x 20 bh

3 POLIS UBIN Lantai/badan m'


Plint m'
Trap m'

4 UBIN PORSELIN
Lokal 11 X 11 putih dos
11 X 11 warna dos
Lokal 15 X 15 putih dos
15 X 15 warna dos
5 MOZAIK PORSELIN
10 X 20 cm m2
15 X 15 cm m2
20 X 20 cm m2
20 X 25 cm m2

6 Keramik 30 X 30 cm polos m2 50,000


20 X 20 cm KM/WC m2 51,000
33 x 33 cm m2
25 x 25 cm m2
15 x 20 cm m2
Keramik anti slip 46,000
Keramik warna pola 30/30 m2 51,000
Keramik warna pola 40/40 m2 64,000
Keramik dinding 20/25 m2 54,000
Keramik dinding 20/20 m2 54,000
7 Parquet Jati m2

8 Batu Paras m2

CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)

9 Batu Tempel Hitam m2

10 GRANITO 40 x 40 cm m2 190,000
30 x 30 cm m2
11 Marmer m2 107,520

12 Keramik lantai 20/20 ex. KIA ( textur) m2


Keramik lantai 30/30 KW I ex. Mulia ( Polish ) m2
Keramik lantai 30/30 KW II ex. Mulia ( un polish ) m2
Keramik lantai 40/40 ex. Hercules m2
Keramik lantai 40/40 ex. Roman m2
Keramik lantai 60/60 ex. Hercules m2
Keramik lantai 60/60 ex. Roman m2
Keramik dinding 10/20 ex. KIA m2
Keramik dinding 20/20 ex. KIA m2
Keramik dinding 20/25 ex. KIA m2
Keramik dinding 25/40 ex. KIA m2
Marmer Tulungagung m2
Marmer lampung m2
Marmer Itali m2
Granito 60x60 polished ex. Innesa (lokal) m2
Granito 60x60 polished ex. Esenza (Import) m2
Batu palimanan lempeng potong pabrikasi m2
Batu candi m2 120,000
Batu andesit m2
Batu lempeng acak ( tidak beraturan) m2
Batu lempeng potong pabrikasi m2

13 Homogenous Tile 60/60 Ex. Indogress TPZ


Plint Homogenous Tile 10/60 Ex. Indogress TPZ
Step Nosing 10/30

V.BAHAN CETAK
1 BUIS BETON Ø 10 cm - 100 cm bh
Ø 20 cm - 100 cm bh 33,000
Ø 30 cm - 100 cm bh 51,000
Ø 40 cm - 100 cm bh 63,000
Ø 50 cm - 100 cm bh 94,000
Ø 60 cm - 100 cm bh 140,000
Ø 70 cm - 100 cm bh
Ø 80 cm - 100 cm bh
Ø 100 cm - 100 cm bh 278,000
Ø 80 cm - 50 cm bh 95,000
Ø 90 cm - 50 cm bh 105,000

CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)

Ø 100 cm - 50 cm bh 139,000
U 10 cm - 100 cm bh
U 15 cm - 100 cm bh
U 20 cm - 100 cm bh 45,000
U 30 cm - 100 cm bh 57,000
U 50 cm - 100 cm bh

2 LUBANG ANGIN (ROSTER) PC + PASIR


10 X 20 cm bh 6,000
20 X 20 cm bh
25 X 25 cm bh
30 X 30 cm bh
15 X 25 cm bh
15 X 30 cm bh

VI B A H A N B E S I
1 BESI BETON besi beton polos kg 11,000
besi beton prestress kg
besi beton ulir kg 11,000

2 BESI PLAT Besi Strip kg 5,000

3 BESI PROFIL Besi Profil kg 14,000


Besi Profil WF kg 18,000
4 JARING - JARING BAJA
Diameter 4 - 15 kg
Diameter 6 - 15 kg
M-8 (size 5,4 x 2,1 m2) lbr
Kawat Bronjong kg
5 BESI SIKU L 40 X 40 X 4 btg
L 50 X 50 X 5 btg
L 60 X 60 X 6 btg
L All Size kg 14,000

6 KAWAT - Ikat beton/bendrat kg 19,000


- Harmonika 12 X 45 mm m2
- Harmonika 12 X 24 mm m2
- Harmonika 14 X 30 mm m2
- Harmonika 14 X 35 mm m2
- Kawat Nyamuk Nylon m2
- Kawat Kasa m2
- Saringan pasir m2
- Kawat loket m2
- Kawat duri rol
- Kawat duri kg
- Kawat bronjong kg

CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)

- Kawat las kg 32,000

7 LAIN-LAIN
Paku asbes kg 28,000
Paku sekrup asbes bh 22,000
Paku crampon bh
Dynabolt ukuran 8 mm x 65 mm bh
Baut gording kg
Hollow Galvanis 2.4. 400 bt
Hollow Galvanis 4.4. 400 bt
Baja Ringan C.75 ex. Taso bt

VII B A H A N P I P A
1 Pipa PVC SII SCJ , S - 12,5 (10 bar)
Pipa PVC DN 20 ( ½" ) AW JIS btg 18,000
Pipa PVC DN 25 ( ¾" ) AW JIS btg 25,000
Pipa PVC DN 32 ( 1" ) AW JIS btg 35,000
Pipa PVC DN 40 ( 1½" ) btg 30,000
Pipa PVC DN 63 ( 2" ) btg 59,000
Pipa PVC DN 90 ( 3" ) btg
Pipa PVC DN 110 ( 4" ) btg 185,000
Pipa PVC DN 160 ( 6" ) btg
Pipa PVC DN 200 ( 8" ) btg
Pipa PVC DN 250 ( 10" ) btg
Pipa PVC DN 315 ( 12" ) btg
Pipa PVC Ø 4" (AW - SCJ) 4 m 185,000
Pipa PVC Ø 2" (AW - SCJ) 4 m 59,000
Pipa PVC Ø 1 1/2" (AW - SCJ) 4 m 30,000
Pipa PVC Ø 1" (AW - SCJ) 4 m 35,000
Pipa PVC Ø 3/4" (AW - SCJ) 4 m 25,000
Pipa PVC Ø 1/2" (AW - SCJ) 4 m 18,000

2 Pipa Medium B Galvanis - SII


Pipa Medium B Galvanis DN ½" btg 108,000
Pipa Medium B Galvanis DN 25 ( ¾" ) btg 132,000
Pipa Medium B Galvanis DN 32 ( 1" ) btg 198,000
Pipa Medium B Galvanis DN 50 ( 1½" ) btg 348,000
Pipa Medium B Galvanis DN 63 ( 2" ) btg 438,000
Pipa Medium B Galvanis DN 2½" btg
Pipa Medium B Galvanis DN 90 ( 3" ) btg 684,000
Pipa Medium B Galvanis DN 110 ( 4" ) btg 672,000
Pipa Medium B Galvanis DN 160 ( 6" ) btg 1,524,000
Pipa Medium B Galvanis DN 200 ( 8" ) btg
Pipa Medium B Galvanis DN 250 ( 10") btg

CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)

VIII B A H A N L A N G I T - L A N G I T
1 AKUSTIK-uk : 30 X 30 lbr
30 X 60 lbr
60 X 120 lbr
List Kayu Profil m' 8,000
2 SOFT BOARD-uk: 4'X 8' (1,2 x2,4 m2)
Gypsum tebal 9 mm lbr 76,000
Gypsum tebal 12 mm lbr
List Gypsum m'
Gypsum tebal 9 mm (120 x 240) lbr
lbr
lbr
lbr
lbr
Sekrup Gypsum bh
Compound zak
GRC Board lbr
Dinabolt Bh
Cotton Plaster bh
List Gypsum m'
Tepung Gypsum kg

3 HARD BOARD-uk: 4'X 8' (particle board) lbr

4 PLY WOOD
Teak wood
90 X 210 X 3 mm lbr
. 120 X 240 X 3 mm lbr
. 90 X 210 X 4 mm lbr 64,000
. 90 X 210 X 9 mm lbr
. 90 X 210 X 12 mm lbr
. 90 X 210 X 15 mm lbr
. 90 X 210 X 18 mm lbr
Tripleks
. 120 X 240 X 3 mm lbr 64,000
. 120 X 240 X 4 mm lbr 76,000
. 120 X 240 X 6 mm lbr
Multipleks
. 120 X 240 X 9 mm lbr 132,000
. 120 X 240 X 12 mm lbr 168,000
. 120 X 240 X 15 mm lbr
. 120 X 240 X 18 mm lbr
Formika ukuran pintu lbr

CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)

Harflex (1,2 x 2,4 m2 tb 5 mm) lbr


(1 x 1 m2 tb 5 mm) lbr
(0,9 x 1,8 m2 tb 5 mm) lbr
Eternit m2 21,000
GRC (1,2 x 2,4 m2 tb 4 mm) lbr

IX B A H A N F I N I S H I N G
1 KAYU
Menie kg 35,000
Dempul plamur kg 16,000
Ambril/amplas lbr 7,000
Batu Apung kg
Cat dasar kg 76,000
. Emco kg
. Yunior 66 (nippon paint) kg
- Koas bh 9,000
. Deculux kg
. Siralax ons
. Spiritus ltr
. Plitur jadi ltr 51,000
. Vernis ltr 51,000

2 TEMBOK
Kalkarium kg
Kapur sirih kg
Plamur kg 16,000
Cat Tembok ex. Nippon Weatherbond kg
Sintex 5 kg
Danabride 5 kg
Catylac 5 kg
Mowilex 5 kg
Alkali Tembok ex. Nippon 3-in 1 Anti-Alkali Primer Sealer kg
MOWILEX PRECOAT VARNISH BATU ALAM lt
Mowilex Clear Coating lt
Cat tembok kg 21,000

3 BESI
Menie kg 35,000
Cat mengkilat kg
Cat kg 76,000
Thinner A ltr
Minyak cat ltr 17,000
Thinner Super ltr
Residu (teer/aspal) drum 360,000
Fibre glass (tanki air)
kapasitas 550 liter. bh

CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)

kapasitas 1100 liter. bh


Lem Aica Aibon kg 19,000

X BAHAN KACA
1 POLOS 3 mm m2 70,000
5 mm m2 95,000
8 mm m2
12 mm m2

2 ES KABUR 3 mm m2
5 mm m2

3 RAY BAND 3 mm m2
5 mm m2 82,000
8 mm m2
12 mm m2

4 TEMPERED 12 mm m2

XI BAHAN INSTALASI LISTRIK


1 KABEL LISTRIK
NYA : . 1 X 1 1/2 mm2 m'
SPLN LMK 1 X 2 1/2 mm2 m'
1X4 mm2 m'
1X6 mm2 m'
NYY :. 2 X 1 1/2 mm2 m'
PRIMA 2 X 2 1/2 mm2 m'
2X4 mm2 m'
2X6 mm2 m'
3 X 1 1/2 mm2 m'
3 X 2 1/2 mm2 m'
3X4 mm2 m'
3X6 mm2 m'
NYM :. 2 X 1 1/2 mm2 m'
PRIMA 2 X 2 1/2 mm2 m'
2X4 mm2 m'
3 X 1 1/2 mm2 m'
3 X 2 1/2 mm2 m'
3X4 mm2 m'
3X6 mm2 m'

2 SKAKELAR
Out bauw . Seri bh
Engkel bh
In bauw . Seri bh

CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)

Engkel bh

3 FUSE BOX (SEKERING KASA)


1 group bh
2 group bh
3 group bh

4 STEKER - Biasa bh
Arde bh
T Biasa bh
T dengan Arde bh

5 FITING Flaon bh
Gantung bh
Kap bh
Kombinasi bh

6 STOP KONTAK - Arde Outbow putih bh


Arde Outbow hitam bh
Arde IB bh
Arde Putar bh

XII ALAT - ALAT PENGUNCI & PENGGANTUNG


1 KUNCI TANAM Union : 1 X slag bh
2 X slag bh
Yale : 1 X slag bh 60,000
2 X slag bh 159,000
Kuda : 1 X slag bh
2 X slag bh 60,000
2 KUNCI SLOOD
Sekelas Kuda Terbang bh 60,000
Sekelas Anchor bh 189,000

2 ENGSEL DAN GERENDEL


Engsel Angin bh
Kupu-kupu biasa bh 10,000
Nylon kupu-kupu bh
Espagnoled - dalam negeri bh
Grendel Tanam luar negeri bh
Grendel biasa bh 4,000
Kait Angin bh 3,000
Door Stop bh

XIII BAHAN SANITAIR


1 KLOSET DUDUK bh 1,164,000
2 KLOSET JONGKOK bh 152,000

CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)

3 WASTAFEL PEDESTAL bh
4 WASTAFEL MEJA OVAL bh
5 WASTAFEL GANTUNG BULAT bh 317,000
6 WASTAFEL GANTUNG SUDUT bh
7 WASTAFEL GANTUNG SUDUT KECIL bh
8 WASTAFEL BAK CUCI bh
9 TEMPAT SABUN GANTUNG bh
10 TEMPAT SABUN TANAM bh
URINOIR KERAMIK STANDART bh 1,393,000
BAK MANDI FIBRE GLASS 70.70.80 bh 317,000
11 SEPTIC TANK (ETERNIT GRESIK)
5 Pemakai 500 liter unit
10 Pemakai 1.000 liter unit
12 LAIN - LAIN
Kran Air 1/2" bh
Kran Air 3/4" bh 24,000
Seal tape bh 4,000
Floor drain bh 4,000
Roof drain kuningan bh

XIV ALAT PENGIKAT KAYU


1 PAKU - ukuran 1" s/d 4" kg 17,000
2 PAKU - payung kg
3 PAKU - sekrup kg 22,000
4 PAKU - beton kg
5 MUR BAUT (kuda-kuda) kg
6 ANGKUR BAUT bh
7 LEM KAYU bh 19,000
8 Tali Ijuk kg 2,500

XV POMPA AIR
1 POMPA AIR TANGAN
Dragon buatan Indonesia bh
2 POMPA AIR LISTRIK
Sanyo 100 watt bh
Fuji 250 watt bh
Shimizu . 100 watt bh
. 90 watt bh
Dab . 125 watt bh
. 175 watt bh

XVI PAVING BLOCK


1 SQUARE Abu-abu m2
Merah/hitam m2
2 HOLLAND Abu-abu m2
Merah/hitam m2

CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)

3 UNIDECOR Abu-abu m2
Merah/hitam m2
4 UNI Abu-abu m2
Merah/hitam m2
5 TRIHEX Abu-abu m2
Merah/hitam m2
6 OLYMPIA HEXA Abu-abu m2
7 HEXAGONAL Abu-abu m2
Merah/hitam m2
8 CASTLE Abu-abu m2
9 TRAPEZ Abu-abu m2
10 TRAPEZ GRASS BLOCK
Abu-abu m2
11 STANDARD GRASS BLOCK ABU-ABU BH
12 BATACO BH 3,000
13 KANSTEEN m'
14 Paving block natural 6 cm ( K- 175 ) m2 45,000
15 Paving block natural 8 cm ( K-175 ) m2 60,000
16 Paving block warna 6 cm ( K- 175 ) m2
17 Paving block warna 8 cm ( K-175 ) m2
Paving abu-abu tebal 6 cm m2 45,000
Paving abu-abu tebal 8 cm m2 60,000
Paving abu-abu K.225 tebal 6 cm m2 68,000
Paving abu-abu K.225 tebal 8 cm m2 80,000
Paving abu-abu K.275 tebal 6 cm m2 77,000
Paving abu-abu K.275 tebal 8 cm m2 90,000

MASTER BETON BOYOLALI (Pricelist 01 Oktober 2014)


1 Paving Block Holland 6 cm K-200-250 Natural bh
2 Paving Block Holland 6 cm K-250-300 Natural bh
3 Paving Block Holland 6 cm K-350-400 Natural bh
4 Paving Block Holland 8 cm K-250-300 Natural bh
5 Paving Block Holland 8 cm K-350-400 Natural bh
6 Paving Block Holland 10 cm K-450-500 Natural bh
7 Paving Block Kubus 6 cm K-250-300 Natural bh
8 Paving Block Kubus 8 cm K-250-300 Natural bh
9 Paving Block Kubus 8 cm K-350-400 Natural bh
10 Paving Block Segi Enam 6 cm K-200-250 Natural bh
11 Paving Block Segi Enam 6 cm K-250-300 Natural bh
12 Paving Block Segi Enam 6 cm K-350-400 Natural bh
13 Topi Uskup Besar 6 cm Natural bh
14 Grass Block Kotak 8cm Natural bh
15 Paving Block Holland 6 cm K-200-250 Warna bh
16 Paving Block Holland 6 cm K-250-300 Warna bh
17 Paving Block Holland 6 cm K-350-400 Warna bh
18 Paving Block Holland 8 cm K-250-300 Warna bh

CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)

19 Paving Block Holland 8 cm K-350-400 Warna bh


20 Paving Block Holland 10 cm K-450-500 Warna bh
21 Paving Block Kubus 6 cm K-250-300 Warna bh
22 Paving Block Kubus 8 cm K-250-300 Warna bh
23 Paving Block Kubus 8 cm K-350-400 Warna bh
24 Paving Block Segi Enam 6 cm K-200-250 Warna bh
25 Paving Block Segi Enam 6 cm K-250-300 Warna bh
26 Paving Block Segi Enam 6 cm K-350-400 Warna bh
27 Topi Uskup Besar 6 cm Warna bh
28 Grass Block Kotak 8cm Warna bh
29 Kansteen bh

ALDAS MUNTILAN (Pricelist 15 Februari 2014)


1 Paving Block Holland uk. 10,5 x 21 tb. 6 cm K-300 Natural bh
2 Paving Block Holland uk. 10,5 x 21 tb. 8 cm K-300 Natural bh
3 Paving Block Holland uk. 10,5 x 21 tb. 6 cm K-250 Natural bh
4 Paving Block Unipave uk. 11 x 22 tb. 8 cm K-300 Natural bh
5 Topi Uskup Kecil tb. 6 cm Natural bh
6 Topi Uskup Kecil tb. 8 cm Natural bh
4 Kanstin Standard uk. 10/12,5 x 30 x 50 K-300 bh
5 Kanstin Lubang uk. 10/12,5 x 30 x 50 K-300 bh
6 Kanstin Standard uk. 15/20 x 30 x 50 K-300 bh
7 Kanstin Lubang uk. 15/20 x 30 x 50 K-300 bh
8 Kanstin Standard uk. 18/21 x 30 x 50 K-300 bh
9 Kanstin Lubang uk. 18/21 x 30 x 50 K-300 bh
10 Grassblock Lubang Kotak uk. 10 x 40 x 40 bh
11 Grassblock Lubang Bulat uk. 10 x 48 x 48 bh

XVII LAIN -LAIN


1 KREI 25 MM m2
2 Sliding Pintu J4 bh
3 Naco rayban 5 mm per Daun bh 82,000
Naco bening 5 mm per Daun bh 91,000
4 Rolling door Besi m2 285,000
Rolling door Almunium m2 443,000
5 Awning Almunium m2
6 Kusen Almunium 4" Putih m' 72,000
7 Kusen Almunium 4" Coklat m' 78,000
7 WIDE FLANGE BEAM
150 X 75 X 5 X 7 X 12 btg

8 ASPAL.
Aspal Ex Pertamina isi Net 160 kg drum

Hotmix Tebal = 4 Cm m2

CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)

Hotmix Tebal = 5 Cm m2
Hotmix Tebal = 6 Cm m2
Hotmix Tebal = 7 Cm m2
Binder Course ton
Wearing Course ton
Hot Roller Sheet ton
Sand Sheet ton
Sand Sheet Emulsi ton
Cold Mix ton
Prime / Tack Coard RC liter
Prime Coat MC liter
Prime / Tack Coat Emulsi liter
10 K A C A
Cermin tebal 5 mm m2

11 PAGAR BRC. Pagar BRC 90 A2 /lb


Pagar BRC 120 A2 /lb
12 LAIN-LAIN
Minyak Beton & bekisting ltr 17,000
Pintu Lipat Besi 0.8 mm m2 660,000
Sunscreen Allumunim m2
Allumunium Foil m2
Soda api kg 33,000
Sabun kg
Air m3 80,000
Koas Alang-alang ikat
Solar (Industri) ltr 6,400
Premium (Industri) ltr 6,700
Pelumas ltr 19,000
Vynil 30 x 30 cm bh

13 WATER PROOFING 5 kg
5 kg
20 Ltr

XVIII BAHAN ALUMUNIUM


1 Alumunium Profil Warna Silver 4" tebal 1.2 mm m' 72,000
Warna Coklat 4" tebal 1.2 mm m' 78,000
Alumunium Coating White 4" tbl 1.2 mm m'

2 Aksesoris Engsel 4" bh


Engsel 3" bh
Cesement 16" set
Kait Angin bh
Rambuncis bh
Sealant tube

CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)

Skrup Fixer bh
Profil Kaca m'
Handle Pintu + Kunci set
Spagnolet Tanam bh
Door Closer set
Spandek PVC m2
Sindik Pintu bh
Floor Hinge Ex. Dekson set
Patch Fitting bh
Pull Handle set

CK Boyolali
HARGA HARGA HARGA INDEX
HARGA HARGA SURVEI I
INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp)
(Rp) (Rp) (Rp)

0.00
0.00 229,000.00
190,000.00 190,080.00 239,000.00 159,000
190,000.00 190,080.00 260,000.00 142,000
200,000.00 200,000.00 135,000.00
200,000.00 200,000.00 200,000.00 240,000
94,210.00 110,000.00 114,000
84,290.00 0.00 102,000
101,650.00 240,000.00 123,000
214,870.00 230,000.00 260,000
206,610.00 215,000.00 250,000
0.00 0.00
0.00 0.00
570.00 760 700
0.00 3400
0.00 3920
0.00 3700
0.00 3700
0.00
84,290.00 125000 102,000
185,000.00 131,400.00 210000 159,000
131,400.00 224000 159,000
42,970.00 72000 52,000
0.00 0
0.00 112000
198,340.00 275000 240,000
0.00 0
0.00
51,230.00 63200 62,000
51,230.00 0 62,000
0.00 0
0.00 0
0.00 0
1,340.00 1580 1,625
0.00 112000
0.00 140000
11,150.00 13500 13,500
0.00

CK Boyolali
HARGA HARGA HARGA INDEX
HARGA HARGA SURVEI I
INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp)
(Rp) (Rp) (Rp)
0.00
0.00 728000
0.00 42790
0.00
0.00
0.00 0
0.00 0
0.00 0
4,950.00 0 6,000
0.00 0
0.00 0
0.00 6280
0.00 6720
2,470.00 3,000
0.00
0.00
330.00 0 400
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
2,470.00 0 3,000
4,950.00 6,000
5,780.00 7,000
5,780.00 7,000
0.00 1250
0.00 2250
0.00 3600
0.00 2580
0.00 10640
0.00 9860
0.00 4480
0.00 7280
0.00 25200
1,810.00 2,200
1,730.00 2,100
1,480.00 1,800
1,400.00 1,700
0.00
0.00
0.00 0
0.00 0
0.00 0
0.00 0
0.00

CK Boyolali
HARGA HARGA HARGA INDEX
HARGA HARGA SURVEI I
INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp)
(Rp) (Rp) (Rp)
0.00
0.00 79300
0.00 0
0.00 105800
0.00 0
0.00 0
0.00 0
0.00 0
36,360.00 0 44,000
41,810.00 53800 50,600
47,270.00 0 57,200
54,540.00 72800 66,000
61,810.00 0 74,800
85,120.00 0 103,000 132000
0.00
0.00
0.00 0
0.00 0
0.00 0
0.00
31,400.00 0 38,000
0.00 0
0.00 0
0.00
0.00
17,350.00 0 21,000
0.00 0
0.00 0
0.00 0
0.00
0.00
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00
0.00 0
0.00 25200
0.00 35300
0.00 53800
33,050.00 0 40,000
0.00 0
0.00
0.00

CK Boyolali
HARGA HARGA HARGA INDEX
HARGA HARGA SURVEI I
INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp)
(Rp) (Rp) (Rp)
23,960.00 29,000
34,710.00 42,000
0.00
0.00 0
47,930.00 0 58,000
59,500.00 42600 72,000
79,330.00 58300 96,000
0.00 0
0.00
0.00
0.00 50000
0.00 75000
0.00 800
0.00 20000
0.00
0.00
0.00 26280000
0.00 23968000
0.00 21400000
13,537,190.00 16,380,000
11,454,540.00 13,860,000
14,578,510.00 17,640,000
12,495,860.00 15,120,000
0.00
7,561,980.00 9800000 9,150,000
7,318,180.00 9072000 8,855,000
0.00
6,063,630.00 6498000 7,337,000 6,000,000.00
7,639,660.00 5936000 9,244,000 6,000,000.00
0.00
5,227,270.00 5600000 6,325,000
4,704,950.00 5152000 5,693,000
0.00 3304000
0.00
0.00 3696000
2,090,900.00 3136000 2,530,000
0.00
9,789,250.00 12880000 11,845,000 9,500,000.00
9,028,920.00 11760000 10,925,000 9,500,000.00
0.00
3,136,360.00 3696000 3,795,000
2,614,040.00 3136000 3,163,000
0.00
16,520.00 20000 20,000
0.00 16000
0.00 25000

CK Boyolali
HARGA HARGA HARGA INDEX
HARGA HARGA SURVEI I
INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp)
(Rp) (Rp) (Rp)
0.00 0
0.00 812000
13,220.00 14200 16,000
0.00 33750
0.00 9700
0.00 26900
0.00
0.00
0.00
0.00 40320
0.00 31360
0.00 0
0.00 0
0.00 0
0.00
0.00 0
0.00 0
0.00
0.00 0
0.00 0
0.00 0
0.00
0.00
0.00 0
0.00 0
0.00 0
0.00 0
0.00
0.00 0
0.00 0
0.00 0
0.00 0
0.00
41,320.00 50400 50,000 42,000.00
42,140.00 0 51,000 49,000.00
0.00 0
0.00 0
0.00 0
38,010.00 46,000
42,140.00 51,000 45,000.00
52,890.00 64,000 47,000.00
44,620.00 54,000 49,000.00
44,620.00 54,000 49,000.00
0.00 0
0.00
0.00 0

CK Boyolali
HARGA HARGA HARGA INDEX
HARGA HARGA SURVEI I
INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp)
(Rp) (Rp) (Rp)
0.00
0.00 0
0.00
157,020.00 0 190,000
0.00 0
88,850.00 107520 107,520
0.00
0.00 60480
0.00 50400
0.00 58240
0.00 68320
0.00 90720
0.00 78400
0.00 98560
0.00 49280
0.00 57120
0.00 62720
0.00 72800
0.00 107520
0.00 85120
0.00 924000
0.00 284480
0.00 470400
0.00 154560
99,170.00 143360 120,000
0.00 201600
0.00 61600
0.00 154560
0.00
0.00 175000
0.00 15000
0.00 23000
0.00
0.00
0.00
0.00 0
27,270.00 39200 33,000
42,140.00 56000 51,000
52,060.00 67200 63,000
77,680.00 75100 94,000
115,700.00 0 140,000
0.00 0
0.00 100800
229,750.00 134100 278,000
78,510.00 95,000
86,770.00 105,000

CK Boyolali
HARGA HARGA HARGA INDEX
HARGA HARGA SURVEI I
INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp)
(Rp) (Rp) (Rp)
114,870.00 139,000
0.00 0
0.00 0
37,190.00 37000 45,000
47,100.00 42600 57,000
0.00 0
0.00
0.00
4,950.00 0 6,000
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00
0.00
9,090.00 10650 11,000
0.00 0
9,090.00 10650 11,000
0.00
4,130.00 10650 5,000
0.00
11,570.00 12900 14,000
14,870.00 18,000
0.00
0.00 0
0.00 0
0.00 616000
0.00 0
0.00 0
0.00 0
0.00 0
11,570.00 13900 14,000
0.00
15,700.00 16800 19,000
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 17250
0.00 16000

CK Boyolali
HARGA HARGA HARGA INDEX
HARGA HARGA SURVEI I
INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp)
(Rp) (Rp) (Rp)
26,440.00 32,000
0.00
0.00
23,140.00 23600 28,000 20,000.00
18,180.00 650 22,000
0.00 1750
0.00 1600
0.00 12600
0.00 21300
0.00 28000
0.00 75000
0.00
0.00
0.00
0.00
14,870.00 0 18,000
20,660.00 0 25,000
28,920.00 0 35,000
24,790.00 0 30,000
48,760.00 0 59,000
0.00 0
152,890.00 0 185,000
0.00 0
0.00 0
0.00 0
0.00 0
152,890.00 185,000 160000
48,760.00 59,000
24,790.00 30,000 29000
28,920.00 35,000 22000
20,660.00 25,000 20000
14,870.00 18,000 18000
0.00
0.00
89,250.00 0 108,000
109,090.00 0 132,000
163,630.00 0 198,000
287,600.00 0 348,000
361,980.00 0 438,000
0.00 0
565,280.00 0 684,000
555,370.00 0 672,000
1,259,500.00 0 1,524,000
0.00 0
0.00 0
0.00

CK Boyolali
HARGA HARGA HARGA INDEX
HARGA HARGA SURVEI I
INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp)
(Rp) (Rp) (Rp)
0.00
0.00 0
0.00 0
0.00 0
6,610.00 9700 8,000
0.00
62,800.00 67968 76,000
0.00 84096
0.00 9000
0.00 80000
0.00 75000
0.00 75000
0.00 65000
0.00 65000
0.00 12.57142857
0.00 75000
0.00 68000
0.00 7200
0.00 15000
0.00 8500
0.00 12500
0.00
0.00
0.00
0.00 0
0.00
0.00
0.00
0.00 0
0.00 0
52,890.00 0 64,000
0.00 0
0.00 0
0.00 0
0.00 0
0.00
52,890.00 50400 64,000 50,000.00
62,800.00 67200 76,000 60,000.00
0.00 84000
0.00
109,090.00 128800 132,000
138,840.00 168000 168,000
0.00 0
0.00 0
0.00 0
0.00

CK Boyolali
HARGA HARGA HARGA INDEX
HARGA HARGA SURVEI I
INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp)
(Rp) (Rp) (Rp)
0.00 85200
0.00 34800
0.00 46000
17,350.00 15700 21,000 15,000.00
0.00 66100
0.00
0.00
0.00
28,920.00 33600 35,000
13,220.00 23600 16,000 29,000.00
5,780.00 9600 7,000
0.00 22400
62,800.00 0 76,000 45,000.00
0.00 0
0.00 0
7,430.00 0 9,000
0.00 58300
0.00 39200
0.00 18000
42,140.00 0 51,000
42,140.00 0 51,000
0.00
0.00
0.00 0
0.00 0
13,220.00 23600 16,000
0.00 80640
0.00 0
0.00 0
0.00 112500
0.00 0
0.00 67200
0.00 67200
0.00 64960
17,350.00 21,000 19,000.00
0.00
0.00
28,920.00 33600 35,000 29,000.00
0.00 58300
62,800.00 0 76,000
0.00 23600
14,040.00 25200 17,000 10000
0.00 0
297,520.00 0 360,000
0.00
0.00 0

CK Boyolali
HARGA HARGA HARGA INDEX
HARGA HARGA SURVEI I
INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp)
(Rp) (Rp) (Rp)
0.00 0
15,700.00 0 19,000
0.00
0.00
57,850.00 0 70,000 55,000.00
78,510.00 60500 95,000 65,000.00
0.00 69500
0.00 106400
0.00
0.00 0
0.00 79600
0.00
0.00 0
67,760.00 68900 82,000 75,000.00
0.00 74500
0.00 117600
0.00
0.00 1200000
0.00
0.00
0.00
0.00
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00
0.00
0.00 0
0.00 0
0.00 0

CK Boyolali
HARGA HARGA HARGA INDEX
HARGA HARGA SURVEI I
INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp)
(Rp) (Rp) (Rp)
0.00 0
0.00
0.00
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00
0.00 0
0.00 0
0.00 0
0.00 0
0.00
0.00 0
0.00 0
0.00 0
0.00 0
0.00
0.00
0.00 0
0.00 0
49,580.00 0 60,000
131,400.00 0 159,000
0.00 0
49,580.00 67200 60,000
0.00
49,580.00 60,000
156,190.00 189,000
0.00
0.00
0.00 0
8,260.00 0 10,000 10,000.00
0.00 0
0.00 0
0.00 0
3,300.00 0 4,000
2,470.00 0 3,000
0.00 0
0.00
0.00
961,980.00 2184000 1,164,000 600,000.00
125,610.00 129000 152,000 145,000.00

CK Boyolali
HARGA HARGA HARGA INDEX
HARGA HARGA SURVEI I
INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp)
(Rp) (Rp) (Rp)
0.00 0
0.00 0
261,980.00 0 317,000 350,000.00
0.00 278000
0.00 0
0.00 0
0.00 0
0.00 0
1,151,230.00 1,393,000
261,980.00 317,000
0.00
0.00 0
0.00 0
0.00
0.00 17000
19,830.00 29500 24,000 15,000.00
3,300.00 3400 4,000
3,300.00 56000 4,000
0.00 79000
0.00
0.00
14,040.00 14600 17,000 12,000.00
0.00 0
18,180.00 0 22,000
0.00 0
0.00 0
0.00 0
15,700.00 0 19,000 13000
2,060.00 2500 2,500
0.00
0.00 24
0.00
0.00 0
0.00
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00
0.00
0.00 0
0.00 0
0.00 0
0.00 0

CK Boyolali
HARGA HARGA HARGA INDEX
HARGA HARGA SURVEI I
INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp)
(Rp) (Rp) (Rp)
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00
0.00 0
0.00 0
2,470.00 0 3,000
0.00 0
37,190.00 58240 45,000
49,580.00 91840 60,000
0.00 69440
0.00 103040
37,190.00 45,000
49,580.00 60,000
56,190.00 68,000
66,110.00 80,000
63,630.00 77,000
74,380.00 90,000
0.00
0.00
0.00 1270
0.00 1460
0.00 1580
0.00 2180
0.00 2450
0.00 3320
0.00 2810
0.00 3840
0.00 4310
0.00 2170
0.00 2510
0.00 2720
0.00 3280
0.00 7310
0.00 1510
0.00 1730
0.00 1880
0.00 2450

CK Boyolali
HARGA HARGA HARGA INDEX
HARGA HARGA SURVEI I
INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp)
(Rp) (Rp) (Rp)
0.00 2710
0.00 3640
0.00 3320
0.00 4310
0.00 4770
0.00 2590
0.00 2970
0.00 3220
0.00 4330
0.00 8340
0.00 26910
0.00
0.00
0.00 1860
0.00 2570
0.00 1690
0.00 2890
0.00 1250
0.00 2460
0.00 30360
0.00 36960
0.00 47520
0.00 52800
0.00 58080
0.00 55440
0.00 16050
0.00 23120
0.00
0.00
0.00
0.00 0
0.00 0
67,760.00 0 82,000
75,200.00 0 91,000
235,530.00 0 285,000
366,110.00 0 443,000
0.00 0
59,500.00 0 72,000
64,460.00 0 78,000
0.00
0.00 0
0.00
0.00
0.00 0
0.00
0.00 0

CK Boyolali
HARGA HARGA HARGA INDEX
HARGA HARGA SURVEI I
INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp)
(Rp) (Rp) (Rp)
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00
0.00 0
0.00
0.00 0
0.00 0
0.00
14,040.00 6000 17,000
545,450.00 0 660,000
0.00 0
0.00 8580
27,270.00 0 33,000
0.00 0
66,110.00 80000 80,000
0.00 0
5,280.00 0 6,400
5,530.00 0 6,700
15,700.00 0 19,000
0.00 0
0.00
0.00 78500
0.00 71000
0.00 525000
0.00
0.00
59,500.00 85000 72,000
64,460.00 108000 78,000
0.00 102000
0.00
0.00 28000
0.00 25500
0.00 75000
0.00 30000
0.00 35000
0.00 35000

CK Boyolali
HARGA HARGA HARGA INDEX
HARGA HARGA SURVEI I
INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp)
(Rp) (Rp) (Rp)
0.00 600
0.00 6000
0.00 250000
0.00 25000
0.00 455000
0.00 55000
0.00 15000
0.00 1490000
0.00 637000
0.00 260000
0.00

CK Boyolali
HARGA SURVEI II INTERNET (Rp)
(Rp)

REAL PLUS PPN

530.00

CK Boyolali
HARGA SURVEI II INTERNET (Rp)
(Rp)

40000 44000
46000 50600
52000 57200
60000 66000
68000 74800
110000 76000 83600

CK Boyolali
HARGA SURVEI II INTERNET (Rp)
(Rp)

40,000.00
48,000.00

55000
43000
45000
48000
49000

CK Boyolali
HARGA SURVEI II INTERNET (Rp)
(Rp)

50,000.00
60,000.00
65,000.00
75,000.00
85,000.00

90,000.00
100,000.00

CK Boyolali
HARGA SURVEI II INTERNET (Rp)
(Rp)

27,500.00
35,000.00

9,500.00

9,500.00

14,000.00

CK Boyolali
HARGA SURVEI II INTERNET (Rp)
(Rp)

15,000.00
35000

CK Boyolali
HARGA SURVEI II INTERNET (Rp)
(Rp)

59,000.00

100,000.00
140,000.00

CK Boyolali
HARGA SURVEI II INTERNET (Rp)
(Rp)

26,000.00
28,000.00

50,000.00

18,000.00

20000

CK Boyolali
HARGA SURVEI II INTERNET (Rp)
(Rp)

65,000.00

10,000.00

5000
5,000.00

650,000.00
140,000.00

CK Boyolali
HARGA SURVEI II INTERNET (Rp)
(Rp)

15,000.00

13000

CK Boyolali
DAFTAR SEWA PERALATAN

PEKERJAAN :
LOKASI :
TAHUN ANGGARAN :

NO. PERALATAN SATUAN HARGA(Rp)

1 Dump Truck 3 ton Jam 112,000


2 Dump Truck 5 ton Jam 168,000
3 Truk Bak Terbuka Jam 112,000
4 Truk Tanki Air Jam 156,800
5 Bulldozer Jam 425,600
6 Motor Grader Jam 190,400
7 Wheel Loader Jam 201,600
8 Excavator Jam 448,000
9 Crane Jam 1,512,000
10 Trailler Jam 224,000
11 Mesin Gilas Tandem 6 - 10 ton Jam 134,400
12 Mesin Gilas 3 roda 6 - 10 ton Jam 156,800
13 Mesin Gilas Roda Karet 8 - 10 ton Jam 190,400
14 Vibratory Roller Jam 44,800
15 Vibro roller 1 ton Jam 44,800
16 Water Pump Jam 16,800
17 Asphalt Sprayer Jam 39,200
18 Pick Up Jam 44,800
19 AMP Jam 3,920,000
20 Asphalt Finisher Jam 560,000
21 Concrete Vibrator Jam 44,800
22 Compressor Jam 112,000
23 Concrete Mixer Jam 72,800
24 Stamper Jam 33,600
25 Genset Jam 168,000
26 Alat Pengecat Marka Jam 78,400
27 Molen hr 252,000

CK Boyolali
DAFTAR SEWA PERALATAN

KET.

CK Boyolali
REKAPITULASI DAFTAR KUANTITAS DAN HARGA

PEKERJAAN : PEMBANGUNAN KLINIK KARANGANYAR


LOKASI : KARANGANYAR
TAHUN ANGGARAN : 2016

NO. URAIAN PEKERJAAN JUMLAH ANGGARAN

a b c
I PEKERJAAN PERSIAPAN Rp 52,760,915.34
II. PEKERJAAN BANGUNAN GEDUNG Rp 1,191,054,706.04
A. PEKERJAAN TANAH Rp 62,091,345.87
B. PEKERJAAN PASANGAN DAN PLESTERAN Rp 203,011,985.59
C. PEKERJAAN KERAMIK DAN PELAPIS DINDING Rp 130,471,954.38
D. PEKERJAAN BETON Rp 330,917,526.00
E. PEKERJAAN BESI DAN ATAP Rp 127,747,011.00
F. PEKERJAAN LANGIT - LANGIT Rp 43,219,000.00
G. PEKERJAAN PINTU DAN JENDELA ALUMUNIUM Rp 219,422,580.26
H. PEKERJAAN INSTALASI LISTRIK Rp 26,361,500.00
I. PEKERJAAN SANITASI Rp 15,310,718.57
J. PEKERJAAN CAT - CATAN Rp 32,501,084.36
III. PEKERJAAN PAGAR DAN HALAMAN Rp 268,345,588.29
A. PLAT BETON JALAN MASUK Rp 56,578,789.01
B. PEKERJAAN TANAH Rp 16,486,123.01
C. PEKERJAAN BETON Rp 61,440,660.81
D. PEKERJAAN PASANGAN DAN PLESTERAN Rp 117,723,140.19
E. PEKERJAAN CAT Rp 7,091,875.27
F. PEKERJAAN TANAMAN Rp 9,025,000.00

Jumlah Rp 1,512,161,209.67
PPN 10% Rp 151,216,120.97
Total Anggaran Rp 1,663,377,330.63
Dibulatkan Rp 1,663,377,000.00
Terbilang ;
Surakarta, 2016
Dibuat Oleh ;
CV. / PT

…………………………….
DIREKTUR
I DAFTAR KUANTITAS DAN HARGA

JUMLAH ANGGARAN

Terbilang ;
DAFTAR KUANTITAS DAN HARGA
PEKERJAAN : PEMBANGUNAN KLINIK KARANGANYAR
LOKASI : KARANGANYAR
TAHUN ANGGARAN : 2016

NO URAIAN PEKERJAAN VOLUME HARGA SATUAN JUMLAH BIAYA

a b c d e=cxd
I PEKERJAAN PERSIAPAN
1 Uitzet dan bouwplank 1.00 Ls Rp 4,500,000.00 Rp 4,500,000.00
2 Papan nama kegiatan 1.00 Ls Rp 750,000.00 Rp 750,000.00
3 Pasang pagar sementara untuk keamanan lokasi proyek 118.00 m' Rp 330,468.88 Rp 38,995,327.84
4 Pembersihan lapangan 630.00 m2 Rp 7,961.25 Rp 5,015,587.50
5 Direksikeet dan brak kerja 1.00 Ls Rp 3,500,000.00 Rp 3,500,000.00

TOTAL I Rp 52,760,915.34
II PEKERJAAN BANGUNAN GEDUNG
A. PEKERJAAN TANAH
1 Galian tanah pondasi batu kali & footplate 248.89 m3 Rp 44,052.53 Rp 10,964,322.30
2 Urugan tanah untuk peninggian lantai 630.00 m3 Rp 72,841.45 Rp 45,890,113.50
3 Urugan tanah kembali 82.96 m3 Rp 11,952.88 Rp 991,658.74
4 Urugan pasir bawah pondasi 10.26 m3 Rp 152,943.45 Rp 1,568,740.97
5 Urugan pasir bawah lantai 17.50 m3 Rp 152,943.45 Rp 2,676,510.38

SUB TOTAL A. Rp 62,091,345.87


B. PEKERJAAN PASANGAN DAN PLESTERAN
1 Pas. Batu Kosong/Anstamping 41.03 m3 Rp 366,528.20 Rp 15,037,918.99
2 Pas. Pondasi Batu Belah 1SP : 8 PP 94.02 m3 Rp 630,128.13 Rp 59,246,222.10
3 Pas. Dinding Bata tras ramm 1/2 Bata 1SP : 5PP 136.76 m2 Rp 95,223.98 Rp 13,022,831.50
4 Pas. Dinding Bata 1/2 Bata 1SP : 8PP 478.66 m2 Rp 91,562.90 Rp 43,827,497.71
5 Pek. Plesteran tras ram 1 Pc : 5 Pp Tebal 15 mm 273.52 m2 Rp 38,238.04 Rp 10,458,868.70
6 Pek. Plesteran 1 Pc : 8 Pp Tebal 15 mm 957.32 m2 Rp 36,306.22 Rp 34,756,670.53
7 Pek. Acian 1,230.84 m2 Rp 21,661.61 Rp 26,661,976.05

SUB TOTAL B. Rp 203,011,985.59


C. PEKERJAAN KERAMIK DAN PELAPIS DINDING
1 Pas lantai granite 60 x 60 335.00 m2 Rp 338,088.74 Rp 113,259,727.90
2 Pas Lantai keramik anti slip 30/30 53.60 m2 Rp 158,775.93 Rp 8,510,389.85
3 Pas Lantai KM/WC Keramik 20 x 20 cm 15.00 m2 Rp 135,754.69 Rp 2,036,320.35
4 Pas Dinding KM/WC Keramik 20 x 25 cm 36.00 m2 Rp 149,054.62 Rp 5,365,966.32
5 Pas List keramik KM/WC Keramik 5 x 20 cm 18.00 m2 Rp 72,197.22 Rp 1,299,549.96

SUB TOTAL C. Rp 130,471,954.38


D. PEKERJAAN BETON
1 Cor beton rabat footplat mutu f'c = 7,4 MPa ( K.100 ) 2.36 m3 Rp 774,876.90 Rp 1,828,709.48
2 Beton footplat
- Cor beton mutu f'c = 19,3 MPa ( K.225 ) 14.23 m3 Rp 940,512.71 Rp 13,379,733.81
- Pembesian 3,072.82 kg Rp 12,651.43 Rp 38,875,567.13
- Bekisting 2 x pakai 39.00 m2 Rp 134,820.73 Rp 5,258,008.47
3 Beton sloof SL 20x30 cm
- Cor beton mutu f'c = 26,4 MPa ( K.300 ) 21.32 m3 Rp 995,470.00 Rp 21,224,415.87
- Pembesian 3,091.55 kg Rp 12,651.43 Rp 39,112,528.42
- Bekisting 2 x pakai 106.61 m2 Rp 145,270.73 Rp 15,486,586.17
4 Beton kolom K1 20x20 cm
- Cor beton mutu f'c = 26,4 MPa ( K.300 ) 5.62 m3 Rp 995,470.00 Rp 5,590,559.52
- Pembesian 1,251.70 kg Rp 12,651.43 Rp 15,835,794.93
- Bekisting 2 x pakai 56.16 m2 Rp 269,547.47 Rp 15,137,785.92
5 Beton kolom praktis 11x11 cm 216.00 m' Rp 60,411.62 Rp 13,048,909.92
6 Beton balok latai 15x15 120.00 m' Rp 82,087.23 Rp 9,850,467.60
7 Beton ringbalk 20x30
- Cor beton mutu f'c = 19,3 MPa ( K.225 ) 24.48 m3 Rp 940,512.71 Rp 23,020,929.60
- Pembesian 3,671.55 kg Rp 12,651.43 Rp 46,450,357.82
- Bekisting 2 x pakai 122.00 m2 Rp 277,137.47 Rp 33,810,771.34
8 Beton Plat canopy 4.29 m3 Rp 2,800,000.00 Rp 12,006,400.00
9 Beton Plat talang 7.50 m3 Rp 2,800,000.00 Rp 21,000,000.00

SUB TOTAL D. Rp 330,917,526.00


E. PEKERJAAN BESI DAN ATAP
1 Pekerjaan pemasangan rangka atap baja ringan 375.00 m2 Rp 210,000.00 Rp 78,750,000.00
2 Pek. Pemasangan atap galvalum 0.35 375.00 m2 Rp 77,234.63 Rp 28,962,986.25
3 Pek. Pemasangan Nook galvalum 25.00 m' Rp 27,984.99 Rp 699,624.75
4 Pas. Relling tangga Stainless 36.48 m2 Rp 530,000.00 Rp 19,334,400.00

SUB TOTAL E. Rp 127,747,011.00


F. PEKERJAAN LANGIT - LANGIT
1 Pas. Plafound Gypsum rangka holow galvanis 350.00 m2 Rp 110,000.00 Rp 38,500,000.00
2 Pas. List Plafoun Gypsum 12 cm 286.00 m' Rp 16,500.00 Rp 4,719,000.00

SUB TOTAL F. Rp 43,219,000.00


G. PEKERJAAN PINTU DAN JENDELA ALUMUNIUM
1 Pasang pintu utama P1 double kaca tempred+asesoris 1.00 Set Rp 9,450,000.00 Rp 9,450,000.00
2 Pas. Kusen Aluminium coklat 4 " 215.20 m' Rp 161,350.28 Rp 34,722,580.26
3 Pas.daun Pintu aluminium P2 double+ kaca + asesoris (1.2 x 210 ) 10.00 bh Rp 1,650,000.00 Rp 16,500,000.00
4 Pas.daun Pintu aluminium P3 single+ kaca + asesoris ( 80 x 210 ) 6.00 bh Rp 1,450,000.00 Rp 8,700,000.00
5 Pas. Daun Pintu Toilet aluminium+spandrill+asesoris ( 60 x 210 ) 2.00 bh Rp 1,200,000.00 Rp 2,400,000.00
6 Pas daun jendela alumunium +kaca+asesoris (1.6 x 3.2 ) 8.00 bh Rp 950,000.00 Rp 7,600,000.00
7 Pas daun jendela alumunium +kaca+asesoris (1.6 x 2.4 ) 12.00 bh Rp 890,000.00 Rp 10,680,000.00
8 Pas daun jendela alumunium +kaca+asesoris (1.4 x 1.6 ) 10.00 bh Rp 835,000.00 Rp 8,350,000.00
9 Pas. Jendela Bouven aluminium + kaca + asesoris 12.00 bh Rp 460,000.00 Rp 5,520,000.00
10 Pas. Dinding partisi Gypsum board rangka profile baja ringan 308.00 m2 Rp 375,000.00 Rp 115,500,000.00

SUB TOTAL G. Rp 219,422,580.26


H. PEKERJAAN INSTALASI LISTRIK
1 Pasang instalasi titik lampu ruangan 55.00 Ttk Rp 140,000.00 Rp 7,700,000.00
2 Pasang instalasi titik stop kontak 27.00 Ttk Rp 140,000.00 Rp 3,780,000.00
3 Pasang instalasi titik stop kontak AC 14.00 Ttk Rp 140,000.00 Rp 1,960,000.00
4 Pasang instalasi ITC (telephone, wifi,tv,dll) Ttk Rp -
5 Pasang lampu SL 11 watt sekualitas philips 14.00 bh Rp 45,000.00 Rp 630,000.00
6 Pasang lampu RMI 2x18 watt + assesories sekualitas philips 17.00 bh Rp 245,000.00 Rp 4,165,000.00
7 Pasang lampu downlight 9 watt sekualitas philips 13.00 bh Rp 85,000.00 Rp 1,105,000.00
8 Pasang lampu taman/spot/penerangan jalan 11.00 bh Rp 365,000.00 Rp 4,015,000.00
9 Pasang saklar tunggal sekualitas brocco 13.00 bh Rp 35,000.00 Rp 455,000.00
10 Pasang saklar ganda sekualitas brocco 21.00 bh Rp 46,500.00 Rp 976,500.00
11 Pasang stop kontak sekualitas brocco 27.00 bh Rp 35,000.00 Rp 945,000.00
12 Pasang stop kontak sekualitas brocco AC 14.00 bh Rp 45,000.00 Rp 630,000.00
13 Pasang MCB + Box 3.00 bh Rp -

SUB TOTAL H. Rp 26,361,500.00


I. PEKERJAAN SANITASI
1 Pekerjaan instalasi air bersih pipa PVC 1" type AW 57.00 m' Rp 12,338.59 Rp 703,299.63
2 Pekerjaan instalasi air bersih pipa PVC 3/4" type AW 25.00 m' Rp 14,810.84 Rp 370,271.00
3 Pekerjaan instalasi air kotor pipa PVC 4" type AW 10.50 m' Rp 87,498.90 Rp 918,738.45
4 Pekerjaan instalasi air kotor pipa PVC 3" type AW 16.00 m' Rp 65,000.00 Rp 1,040,000.00
5 Pasang instalasi hydrant pipa besi 3/4" m' Rp -
6 Pasang stop pipa hydrant 3/4" bh Rp -
7 Pasang closet duduk sekualitas TOTO 2.00 bh Rp 2,800,000.00 Rp 5,600,000.00
8 Pasang urinoir sekualitas TOTO 2.00 bh Rp 1,776,931.75 Rp 3,553,863.50
9 Pasang wastafel sekualitas TOTO 3.00 bh Rp 495,437.25 Rp 1,486,311.75
10 Pasang kran air 1/2" sekualitas TAHO 8.00 bh Rp 51,029.28 Rp 408,234.24
11 Pasang kran air wastafel 1/2" sekualitas TAHO 3.00 bh Rp 125,000.00 Rp 375,000.00
12 Pasang flordrain stainless 3.00 bh Rp 35,000.00 Rp 105,000.00
13 Pasang shower kloset 2.00 bh Rp 195,000.00 Rp 390,000.00
14 Pasang kaca cermin 5 mm 2.40 m2 Rp 150,000.00 Rp 360,000.00

SUB TOTAL I. Rp 15,310,718.57


J. PEKERJAAN CAT - CATAN
1 Pekerjaan Cat dinding dalam sekwalitas catylac 2,080.84 m2 Rp 13,370.31 Rp 27,821,475.86
2 Pekerjaan cat plafound 350.00 m2 Rp 13,370.31 Rp 4,679,608.50

SUB TOTAL J. Rp 32,501,084.36


TOTAL II. ( A + B + C + D + E + F + G + H + I + J ) 1,191,054,706.04
III. PEKERJAAN PAGAR DAN HALAMAN
A. PLAT BETON JALAN MASUK
1 Galian Tanah 35.84 m3 Rp 44,052.53 Rp 1,578,842.68
2 Urugan Pasir 4.48 m3 Rp 152,943.45 Rp 685,186.66
3 Pasangan pondasi batu kali 39.76 m3 Rp 630,128.13 Rp 25,053,894.45
4 Plester dinding 42.00 m2 Rp 36,306.22 Rp 1,524,861.24
5 Pek. Beton 6.65 m3 Rp 995,470.00 Rp 6,619,875.50
6 Penulangan 1,064.00 kg Rp 12,651.43 Rp 13,461,121.52
7 Begesting 21.95 m2 Rp 348,747.47 Rp 7,655,006.97

SUB TOTAL A. Rp 56,578,789.01


B. PEKERJAAN TANAH
1 Pekerjaan galian tanah pondasi pagar 73.92 m3 Rp 44,052.53 Rp 3,256,363.02
2 Pekerjaan galian tanah pondasi footplat pagar 20.00 m3 Rp 44,052.53 Rp 881,050.60
3 Urugan tanah kembali 31.31 m3 Rp 11,952.88 Rp 374,204.83
4 Urugan pasir bawah footplat 1.25 m3 Rp 152,943.45 Rp 191,179.31
5 Urugan pasir bawah pondasi 3.08 m3 Rp 152,943.45 Rp 471,065.83
6 Urugan pasir bawah paving 25.73 m3 Rp 152,943.45 Rp 3,935,846.74
7 Urugan Sirtu bawah paving 38.60 m3 Rp 163,568.63 Rp 6,313,912.69
8 Urugan tanah subur 12.50 m3 Rp 85,000.00 Rp 1,062,500.00

SUB TOTAL B. Rp 16,486,123.01


C. PEKERJAAN BETON
1 Cor beton rabat bawah footplat beton mutu f'c = 7,4 MPa ( K.100 ) 3.00 m3 Rp 774,876.90 Rp 2,324,630.70
2 Beton pondasi footplat pagar
- Cor beton mutu f'c = 19,3 MPa ( K.225 ) 4.50 m3 Rp 940,512.71 Rp 4,232,307.20
- Pembesian 945.00 kg Rp 12,651.43 Rp 11,955,601.35
- Bekisting 12.38 m2 Rp 134,820.73 Rp 1,668,406.53
3 Beton kolom footplat 20x20 cm
- Cor beton mutu f'c = 19,3 MPa ( K.225 ) 1.80 m3 Rp 940,512.71 Rp 1,692,922.88
- Pembesian 401.18 kg Rp 12,651.43 Rp 5,075,551.29
- Bekisting 2 x pakai 10.00 m2 Rp 269,547.47 Rp 2,695,474.70
4 Beton sloof 15x25 cm
- Cor beton mutu f'c = 19,3 MPa ( K.225 ) 4.40 m3 Rp 940,512.71 Rp 4,138,255.92
- Pembesian 946.00 kg Rp 12,651.43 Rp 11,968,252.78
- Bekisting 2 x pakai 13.34 m2 Rp 145,270.73 Rp 1,937,185.18
6 Beton balok ring 20x20 cm
- Cor beton mutu f'c = 19,3 MPa ( K.225 ) 3.52 m3 Rp 940,512.71 Rp 3,310,604.74
- Pembesian 739.20 kg Rp 12,651.43 Rp 9,351,937.06
- Bekisting 2 x pakai 7.50 m2 Rp 145,270.73 Rp 1,089,530.48

SUB TOTAL C. Rp 61,440,660.81


D. PEKERJAAN PASANGAN DAN PLESTERAN
1 Pas. Pondasi Batu Belah 1SP : 8 PP 44.00 m3 Rp 630,128.13 Rp 27,725,637.72
2 Pas. Dinding Bata 1/2 Bata 1SP : 8PP 220.00 m2 Rp 91,562.90 Rp 20,143,838.00
3 Pek. Plesteran 1 Pc : 8 Pp Tebal 15 mm 440.00 m2 Rp 36,306.22 Rp 15,974,736.80
4 Pek. Acian 440.00 m2 Rp 21,661.61 Rp 9,531,108.40
5 Pasang paving kawung tebal 8 cm SNI 257.34 m2 Rp 83,337.98 Rp 21,446,195.77
6 Pasang kanstin beton camp. 1 Pc : 2 Ps : 3 Kr 5.00 m3 Rp 909,124.70 Rp 4,545,623.50
7 Pasang pintu pagar besi 35.30 m2 Rp 520,000.00 Rp 18,356,000.00

SUB TOTAL D. Rp 117,723,140.19


E. PEKERJAAN CAT
1 Pekerjaan cat dinding sekualitas Catylac 440.00 m2 Rp 13,370.31 Rp 5,882,936.40
2 Pekerjaan cat besi sekualitas Bee Brand 70.60 m2 Rp 17,123.78 Rp 1,208,938.87

SUB TOTAL E. Rp 7,091,875.27


F. PEKERJAAN TANAMAN
1 Tanam rumput gajah mini 25.00 m2 Rp 75,000.00 Rp 1,875,000.00
2 Tanam pohon palm 1 m 7.00 bh Rp 250,000.00 Rp 1,750,000.00
3 Tanam bunga penghias / pohon peneduh (sejenis ketepeng) 12.00 bh Rp 450,000.00 Rp 5,400,000.00

SUB TOTAL F. Rp 9,025,000.00


TOTAL III. ( A+B+C+D+E+F) Rp 268,345,588.29

Surakarta, 2016
Dibuat Oleh ;
CV. / PT

…………………………….
Direktur
DAFTAR HARGA SATUAN PE
TAHUN 2015 KABUPATE

NO. KODE URAIAN PEKERJAA

I A. 2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN


1 A.2.2.1.2 Pagar Sementara dari Seng Gelombang Tinggi 2,00 m
2 A.2.2.1.4 Pengukuran dan Pemasangan Bouwplank
3 A.2.2.1.5 Pembuatan Kantor Sementara dg Lantai Plesteran
4 A.2.2.1.6 Pembuatan Gudang Semen dan Peralatan
5 A.2.2.1.8 Membersihkan Lapangan dan Perataan
6 A.2.2.1.10 Pembuatan Kotak Adukan ukuran 40cmx50cmx25cm
7 A.2.2.1.11 Pembuatan Steger/Perancah dari Bambu
8 A.2.2.1.13 Bongkaran Beton Bertulang
9 A.2.2.1.14 Bongkaran Dinding Tembok Bata Merah
10 A.2.2.1.17 Bongkaran tegel
11 A.2.2.1.18 Menurunkan usuk dan reng dari kayu
12 A.2.2.1.19 Membongkar pyan
13 A.2.2.1.20 Menurunkan genteng

II A.2.3.1 HARGA SATUAN PEKERJAAN TANAH


1 A.2.3.1.1 Menggali Tanah Biasa Sedalam 1 m
2 A.2.3.1.2 Menggali Tanah Biasa Sedalam 2 m
3 A.2.3.1.3 Menggali Tanah Biasa Sedalam 3 m
4 A.2.3.1.4 Menggali Tanah Keras Sedalam 1 m
5 A.2.3.1.5 Menggali Tanah Cadas Sedalam 1 m
6 A.2.3.1.6 Menggali Tanah Lumpur Sedalam 1 m
7 A.2.3.1.7 Mengerjakan Striping Tebing Setinggi 1 m
8 A.2.3.1.8 Membuang Tanah sejauh 30 m'
9 A.2.3.1.9 Pengurugan Kembali
10 A.2.3.1.10 Pemadatan Tanah (per 20 cm)
11 A.2.3.1.11 Urugan Pasir
12 A.2.3.1.14 Pemasangan Lapisan Ijuk tebal 10 cm unt Bidang Resapan
13 A.2.3.1.15 Mengurug Sirtu Padat
14 A.2.3.1.16 Urugan tanah padas

III A.3.2.1. HARGA SATUAN PEKERJAAN PONDASI


1 A.3.2.1.1 Pemasangan Pondasi Batu Belah 1SP : 3 PP
2 A.3.2.1.2 Pemasangan Pondasi Batu Belah 1SP : 4 PP
3 A.3.2.1.3 Pemasangan Pondasi Batu Belah 1SP : 5 PP
4 A.3.2.1.4 Pemasangan Pondasi Batu Belah 1SP : 6 PP
5 A.3.2.1.5 Pemasangan Pondasi Batu Belah 1SP : 8 PP
6 A.3.2.1.7 Pemasangan Pondasi Batu Belah, 1 SP : 3 KP : 10 PP
7 A.3.2.1.8 Pemasangan Pondasi Batu Belah, ¼ SP : 1KP : 4 PP
8 A.3.2.1.9 Pemasang Batu Kosong/Anstamping
9 A.3.2.1.10 Pasang Pondasi Siklop, 60% Beton Camp. 1PC : 2PB : 3KR &
10 A.3.2.1.11 Pasang Pondasi Sumuran diameter 100 cm

CK Boyolali
NO. KODE URAIAN PEKERJAA

IV A.4.1.1 HARGA SATUAN PEKERJAAN B E T O N


1 A.4.1.1.1 Membuat Beton mutu f'c=7,4 Mpa (K100), slum (12±2)cm,
2 A.4.1.1.2 Membuat Beton mutu f'c=9,8 Mpa (K125), slum (12±2)cm,
3 A.4.1.1.3 Membuat Beton mutu f'c=12,2 Mpa (K150), slum (12±2)cm
4 A.4.1.1.4 Membuat Lantai Kerja Beton mutu f'c=7,4 MPa (K100), slu
5 A.4.1.1.5 Membuat Beton mutu f'c=14,5 MPa (K175), slum (12±2)cm
6 A.4.1.1.6 Membuat Beton mutu f'c=16,9 MPa (K200), slum (12±2)cm
7 A.4.1.1.7 Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm
8 A.4.1.1.8 Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm
9 A.4.1.1.9 Membuat Lantai Kerja Beton mutu f'c=24,0 MPa (K275), sl
10 A.4.1.1.10 Membuat Beton mutu f'c=26,4 MPa (K300), slum (12±2)cm
11 A.4.1.1.11 Membuat Beton mutu f'c=28,8 MPa (K325), slum (12±2)cm
12 A.4.1.1.12 Membuat Beton mutu f'c=31,2 MPa (K350), slum (12±2)cm
13 A.4.1.1.17 Pembesian dg Besi Polos atau Besi Ulir
14 A.4.1.1.20 Memasang Bekisting untuk Pondasi
15 A.4.1.1.21 Memasang Bekisting untuk Sloof
16 A.4.1.1.22 Memasang Bekisting untuk Kolom
17 A.4.1.1.23 Memasang Bekisting untuk Balok
18 A.4.1.1.24 Memasang Bekisting untuk Lantai
19 A.4.1.1.25 Memasang Bekisting untuk Dinding
20 A.4.1.1.26 Memasang Bekisting untuk Tangga
21 A.4.1.1.27 Memasang Jembatan Cor
22 A.4.1.1.28 Membuat Pondasi Beton Bertulang (150 kg Besi + Bekisting)
23 A.4.1.1.29 Membuat Sloof Beton Bertulang (200 kg Besi + Bekisting)
24 A.4.1.1.30 Membuat Kolom Beton Bertulang (300 kg Besi + Bekisting)
25 A.4.1.1.31 Membuat Balok Beton Bertulang (200 kg Besi + Bekisting)
26 A.4.1.1.32 Membuat plat beton bertulang (150 kg besi + bekisting)
27 A.4.1.1.33 Membuat Dinding Beton Bertulang (150 kg Besi + Bekisting)
28 A.4.1.1.34 Membuat Dinding Beton Bertulang (200 kg Besi + Bekisting)
29 A.4.1.1.35 Membuat Kolom Penguat Beton Bertulang (11 x 11) cm
30 A.4.1.1.36 Membuat Ring Balok Beton Bertulang (10 x 15) cm
31 A.4.1.1.37 Membuat Beton 1Pc : 2Ps : 3Kr
32 A.4.1.1.38 Membuat Beton 1Pc : 3Ps : 6Kr
33 A.4.1.1.39 Membuat Beton 1Pc : 3Ps : 5Kr

V A.4.2.1 HARGA SATUAN PEKERJAAN BESI & ALLUMUNIUM


1 A.4.2.1.1 Pemasangan Besi Profil
2 A.4.2.1.2 Pemasangan Rangka Kuda-kuda Baja IWF
3 A.4.2.1.4 Pembuatan Pintu Besi Plat Baja tebal 2 mm rangkap, rangka
4 A.4.2.1.5 Pengerjaan Pengelasan dengan Las Listrik
5 A.4.2.1.7 Pemasangan Pintu Rolling Door Besi
6 A.4.2.1.8 Pemasangan Pintu Lipat (Folding Door) 0.8 mm
7 A.4.2.1.10 Pemasangan Rolling Door Allumunium
8 A.4.2.1.11a Pemasangan Kusen Pintu Allumunium Putih 4'

CK Boyolali
NO. KODE URAIAN PEKERJAA

9 A.4.2.1.11b Pemasangan Kusen Pintu Allumunium Coklat 4'


10 A.4.2.1.13a Pemasangan Pintu Kaca Rangka Allumunium Putih
11 A.4.2.1.13b Pemasangan Pintu Kaca Rangka Allumunium Coklat
12 A.4.2.1.14 Pemasangan Venetions Blinds & Vertical Blinds
13 A.4.2.1.15 Pemasangan Terali Besi Strip (2x3) cm
14 A.4.2.1.17a Pemasangan Jendela Nako rayban 5 mm & Tralis
15 A.4.2.1.17b Pemasangan Jendela Nako bening 5 mm & Tralis
16 A.4.2.1.18 Pemasangan Talang Datar/Jurai , Seng BJLS 30 Lebar 90 cm
17 A.4.2.1.18a Pemasangan Talang 1/2 Lingkaran Ø 15 cm, Seng Plaat BJLS
18 A.4.2.1.20 Pemasangan 1 m2 rangka besi hollow 1x40.40.2 mm, modu
19 A.4.2.1.21 Pemasangan 1 m2 rangka besi hollow 1x40.40.2 mm, modu

VI A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING


1 A.4.4.1.1 Pemasangan Dinding Bata Merah ukuran (5x11x22) cm Teb
2 A.4.4.1.2 Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Teb
3 A.4.4.1.3 Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Teb
4 A.4.4.1.4 Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Teb
5 A.4.4.1.5 Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Teb
6 A.4.4.1.6 Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Teb
7 A.4.4.1.7 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Teb
8 A.4.4.1.8 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Teb
9 A.4.4.1.9 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Teb
10 A.4.4.1.10 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Teb
11 A.4.4.1.11 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Teb
12 A.4.4.1.12 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Teb
13 A.4.4.1.13 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Teb
14 A.4.4.1.16 Pemasangan Dinding HB/CB 10, speci camp. 1SP : 3PP
15 A.4.4.1.17 Pemasangan Dinding HB/CB 10, speci camp. 1SP : 4PP
16 A.4.4.1.22 Pemasangan Dinding Terawang (Rooster) Uk, (12x11x24)cm

VII A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN


1 A,4,4,2.1 Pemasangan Plesteran 1 Pc : 1 Pp Tebal 15 mm
2 A,4,4,2.2 Pemasangan Plesteran 1 Pc : 2 Pp Tebal 15 mm
3 A,4,4,2.3 Pemasangan Plesteran 1 Pc : 3 Pp Tebal 15 mm
4 A,4,4,2.4 Pemasangan Plesteran 1 Pc : 4 Pp Tebal 15 mm
5 A,4,4,2.5 Pemasangan Plesteran 1 Pc : 5 Pp Tebal 15 mm
6 A,4,4,2.6 Pemasangan Plesteran 1 Pc : 6 Pp Tebal 15 mm
7 A,4,4,2.7 Pemasangan Plesteran 1 Pc : 7 Pp Tebal 15 mm
8 A,4,4,2.8 Pemasangan Plesteran 1 Pc : 8 Pp Tebal 15 mm
9 A.4.4.2.9 Pemasangan Plesteran 1 Pc : 1/2 Kp : 3 Pp Tebal 15 mm
10 A,4,4,2.10 Pemasangan Plesteran 1 Pc : 2 Kp : 8 Pp Tebal 15 mm
11 A,4,4,2.13 Pemasangan Plesteran 1 Pc : 2 Pp Tebal 20 mm
12 A,4,4,2.14 Pemasangan Plesteran 1Pc : 3Pp Tebal 20 mm
13 A,4,4,2.15 Pemasangan Plesteran 1 Pc : 4 Pp Tebal 20 mm
14 A,4,4,2.16 Pemasangan Plesteran 1Pc : 5Pp Tebal 20 mm

CK Boyolali
NO. KODE URAIAN PEKERJAA

15 A,4,4,2.17 Pemasangan Plesteran 1Pc : 6Pp Tebal 20 mm


16 A,4,4,2.19 Pemasangan Berapen 1 Pc : 5Pp Tebal 15 mm
17 A,4,4,2.20 Pemasangan Plesteran Skoning 1 Pc : 2Pp, lebar 10 mm
18 A,4,4,2.23 Pemasangan Plesteran Ciprat 1Pc : 2 Pp
19 A,4,4,2.24 Pemasangan Finishing Siar Pasangan Dinding Bata Merah (=
20 A,4,4,2.25 Pemasangan Finishing Siar Pasangan Dinding Conblock eks
21 A,4,4,2.26 Pemasangan Finishing Siar Pas.Batu Kali Adukan 1Pc : 2Pp
22 A,4,4,2.27 Pemasangan Acian

VIII A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI dan DIN


1 A.4.4.3.35a Pemasangan Lantai Keramik 30 x 30 cm polos
2 A.4.4.3.35b Pemasangan Lantai Keramik 40 x 40 cm polos
3 A.4.4.3.35c Pemasangan Lantai Keramik 40 x 40 cm warna pola
4 A.4.4.3.35d Pemasangan Lantai Keramik Anti Selip 40 x 40
5 A.4.4.3.36 Pemasangan Lantai Keramik 20 x 20 cm
6 A.4.4.3.39 Pemasangan Plint Keramik Ukuran 10x20 cm
7 A.4.4.3.39a Pemasangan Lis Keramik 5x20 cm
8 A.4.4.3.44 Pemasangan Lantai Karpet
9 A.4.4.3.54 Pemasangan Dinding Keramik 20x20 cm,
10 A.4.4.3.54a Pemasangan Dinding Keramik 20x25 cm,
11 A.4.4.3.58a Pemasangan Dinding Batu Candi
12 A.4.4.3.58b Pemasangan Dinding Batu Andesit
13 A.4.4.3.58c Pemasangan Dinding Batu Andesit Alur
14 A.4.4.3.63b Pemasangan Plint Kayu Jati kelas III (lebar 10 cm tebal 2 cm
15 A.4.4.3.64 Pas. Paving abu-abu tebal 6 cm
16 A.4.4.3.65 Pas. Paving abu-abu tebal 8 cm
17 A.4.4.3.66 Pas. Paving abu-abu K.250 tebal 6 cm
18 A.4.4.3.67 Pas. Paving abu-abu K.250 tebal 8 cm
19 A.4.4.3.69 Pas. Paving abu-abu K.300 tebal 6 cm
20 A.4.4.3.70 Pas. Paving abu-abu K.300 tebal 8 cm

IX A.4.5.1 HARGA SATUAN PEKERJAAN LANGIT-LANGIT


1 A.4.5.1.1 Pemasangan Langit-langit GRC (1,00x1,00) m
2 A.4.5.1.5a Memasang Langit-langit Tripleks Uk (120x240) cm, Tebal 4
3 A.4.5.1.5b Memasang Langit-langit Tripleks Uk (120x240) cm, Tebal 3
4 A.4.5.1.6a Memasang Langit-langit Lambriziring Kayu Jati Kelas II, teb
5 A.4.5.1.6b Memasang Langit-langit Lambriziring Kayu Jati Kelas III, teb
6 A.4.5.1.6c Memasang Langit-langit Lambriziring Kayu Bengkirai, teba
7 A.4.5.1.6d Memasang Langit-langit Lambriziring Kayu Kamfer, tebal 9
8 A.4.5.1.6e Memasang Langit-langit Lambriziring Kayu Kruing, tebal 9
9 A.4.5.1.7 Memasang Langit-langit Gypsum Board, Uk (120x240) teba
10 A.4.5.1.8 List Langit-Langit Kayu Profil

X A.4.5.2 HARGA SATUAN PEKERJAAN PENUTUP ATAP


1 A.4.5.2.1a Pemasangan Atap Genteng Soka Kebumen

CK Boyolali
NO. KODE URAIAN PEKERJAA

2 A.4.5.2.1b Pemasangan Atap Genteng Press Mantili Mojolaban


3 A.4.5.2.4a Pemasangan Genteng Bubung Soka Kebumen
4 A.4.5.2.4b Pemasangan Genteng Bubung Mantili Mojolaban
5 A.4.5.2.43 Pemasangan Atap Asbes Gelombang (2,25x0,92 m) x 5 mm
6 A.4.5.2.44 Pemasangan Atap Asbes Gelombang (2,00x0,92 m) x 5 mm
7 A.4.5.2.45 Pemasangan Atap Asbes Gelombang (3,00x1,05 m) x 4 mm
8 A.4.5.2.46 Pemasangan Atap Asbes Gelombang (2,10x1,05 m) x 4 mm
9 A.4.5.2.1c Pemasangan Atap Genteng Beton
10 A.4.5.2.4c Pemasangan Nok Genteng Beton
11 A.4.5.2.38 Pemasangan Atap Seng Galvalum
12 A.4.5.2.39 Pemasangan Atap Nok galvalum

XI A.4.6.1 HARGA SATUAN PEKERJAAN K A Y U


1 A.4.6.1.2a Pembuatan & Pemasangan Kosen Pintu & Jendela Kayu Jati
2 A.4.6.1.2b Pembuatan & Pemasangan Kosen Pintu & Jendela Kayu Jati
3 A.4.6.1.2c Pembuatan & Pemasangan Kosen Pintu & Jendela Kayu Ben
4 A.4.6.1.2d Pembuatan & Pemasangan Kosen Pintu & Jendela Kayu Kam
5 A.4.6.1.2e Pembuatan & Pemasangan Kosen Pintu & Jendela Kayu Kru
6 A.4.6.1.4a Pembuatan & Pemasangan Pintu Klamp Standard Kayu Jati
7 A.4.6.1.4b Pembuatan & Pemasangan Pintu Klamp Standard Kayu Jati
8 A.4.6.1.4c Pembuatan & Pemasangan Pintu Klamp Standard Kayu Ben
9 A.4.6.1.4d Pembuatan & Pemasangan Pintu Klamp Standard Kayu Kam
10 A.4.6.1.4e Pembuatan & Pemasangan Pintu Klamp Standard Kayu Kru
11 A.4.6.1.5a Pembuatan & Pemasangan Daun Pintu Panel, Kayu Jati Kela
12 A.4.6.1.5b Pembuatan & Pemasangan Daun Pintu Panel, Kayu Jati Kela
13 A.4.6.1.5c Pembuatan & Pemasangan Daun Pintu Panel, Kayu Bengkira
14 A.4.6.1.5d Pembuatan & Pemasangan Daun Pintu Panel, Kayu Kamfer
15 A.4.6.1.5e Pembuatan & Pemasangan Daun Pintu Panel, Kayu Kruing
16 A.4.6.1.6a Pembuatan & Pemasangan Pintu & Jendela Kaca Kayu Jati K
17 A.4.6.1.6b Pembuatan & Pemasangan Pintu & Jendela Kaca Kayu Jati K
18 A.4.6.1.6c Pembuatan & Pemasangan Pintu & Jendela Kaca Kayu Beng
19 A.4.6.1.6d Pembuatan & Pemasangan Pintu & Jendela Kaca Kayu Kamf
20 A.4.6.1.6e Pembuatan & Pemasangan Pintu & Jendela Kaca Kayu Kruin
21 A.4.6.1.7a Pembuatan & Pemasangan Pintu & Jendela Jalusi Kayu Jati K
22 A.4.6.1.7b Pembuatan & Pemasangan Pintu & Jendela Jalusi Kayu Jati K
23 A.4.6.1.7c Pembuatan & Pemasangan Pintu & Jendela Jalusi Kayu Beng
24 A.4.6.1.7d Pembuatan & Pemasangan Pintu & Jendela Jalusi Kayu Kam
25 A.4.6.1.7e Pembuatan & Pemasangan Pintu & Jendela Jalusi Kayu Krui
26 A.4.6.1.8a Pembuatan&Pemasangan Pintu kayu lapis (Plywood) Rangkap ra
27 A.4.6.1.8b Pembuatan&Pemasangan Pintu kayu lapis (Plywood) Rangkap ra
28 A.4.6.1.8c Pembuatan&Pemasangan Pintu kayu lapis (Plywood) Rangkap ra
29 A.4.6.1.8d Pembuatan&Pemasangan Pintu kayu lapis (Plywood) Rangkap ra
30 A.4.6.1.8e Pembuatan&Pemasangan Pintu kayu lapis (Plywood) Rangkap ra
31 A.4.6.1.9a Pembuatan&Pemasangan Pintu Plywood rangkap, rangka e
32 A.4.6.1.9b Pembuatan&Pemasangan Pintu Plywood rangkap, rangka e

CK Boyolali
NO. KODE URAIAN PEKERJAA

33 A.4.6.1.9c Pembuatan&Pemasangan Pintu Plywood rangkap, rangka e


34 A.4.6.1.9d Pembuatan&Pemasangan Pintu Plywood rangkap, rangka e
35 A.4.6.1.9e Pembuatan&Pemasangan Pintu Plywood rangkap, rangka e
36 A.4.6.1.10a Pembuatan & Pemasangan Jalusi mati Kosen Kayu Jati Kelas
37 A.4.6.1.10b Pembuatan & Pemasangan Jalusi mati Kosen Kayu Jati Kelas
38 A.4.6.1.10c Pembuatan & Pemasangan Jalusi mati Kosen Kayu Bengkira
39 A.4.6.1.10d Pembuatan & Pemasangan Jalusi mati Kosen Kayu Kamfer
40 A.4.6.1.10e Pembuatan & Pemasangan Jalusi mati Kosen Kayu Kruing
41 A.4.6.1.11a Pembuatan & Pemasangan Pintu Teakwood Rangkap, Rangk
42 A.4.6.1.11b Pembuatan & Pemasangan Pintu Teakwood Rangkap, Rangk
43 A.4.6.1.11c Pembuatan & Pemasangan Pintu Teakwood Rangkap, Rangk
44 A.4.6.1.11d Pembuatan & Pemasangan Pintu Teakwood Rangkap, Rangk
45 A.4.6.1.11e Pembuatan & Pemasangan Pintu Teakwood Rangkap, Rangk
46 A.4.6.1.12a Pembuatan&Pemasangan Pintu Teakwood Rangkap Lapis F
47 A.4.6.1.13a Pembuatan&Memasang Konstruksi Kuda-kuda Konvensiona
48 A.4.6.1.13b Pembuatan&Memasang Konstruksi Kuda-kuda Konvensiona
49 A.4.6.1.13c Pembuatan&Memasang Konstruksi Kuda-kuda Konvensiona
50 A.4.6.1.13d Pembuatan&Memasang Konstruksi Kuda-kuda Konvensiona
51 A.4.6.1.13e Pembuatan&Memasang Konstruksi Kuda-kuda Konvensiona
52 A.4.6.1.14a Pembuatan&Pemasangan Konstruksi Kuda-kuda Expose, Ka
53 A.4.6.1.14b Pembuatan&Pemasangan Konstruksi Kuda-kuda Expose, Ka
54 A.4.6.1.14c Pembuatan&Pemasangan Konstruksi Kuda-kuda Expose, Ka
55 A.4.6.1.14d Pembuatan&Pemasangan Konstruksi Kuda-kuda Expose, Ka
56 A.4.6.1.14e Pembuatan&Pemasangan Konstruksi Kuda-kuda Expose, Ka
57 A.4.6.1.15a Pemasangan konstruksi Gording, Kayu Klas Jati Kelas II
58 A.4.6.1.15b Pemasangan konstruksi Gording, Kayu Klas Jati Kelas III
59 A.4.6.1.15c Pemasangan konstruksi Gording, Kayu Klas Bengkirai
60 A.4.6.1.15d Pemasangan konstruksi Gording, Kayu Klas Kamfer
61 A.4.6.1.15e Pemasangan konstruksi Gording, Kayu Klas Kruing
62 A.4.6.1.16a Pemasangan Rangka Atap Genteng Keramik, Kayu Klas Jati K
63 A.4.6.1.16b Pemasangan Rangka Atap Genteng Keramik, Kayu Klas Jati K
64 A.4.6.1.16c Pemasangan Rangka Atap Genteng Keramik, Kayu Bengkira
65 A.4.6.1.16d Pemasangan Rangka Atap Genteng Keramik, Kayu Kamfer
66 A.4.6.1.16e Pemasangan Rangka Atap Genteng Keramik, Kayu Kruing
67 A.4.6.1.17a Pemasangan Rangka Atap Genteng Beton, Kayu Jati kelas II
68 A.4.6.1.17b Pemasangan Rangka Atap Genteng Beton, Kayu Jati kelas III
69 A.4.6.1.17c Pemasangan Rangka Atap Genteng Beton, Kayu Bengkirai
70 A.4.6.1.17d Pemasangan Rangka Atap Genteng Beton, Kayu Kamfer
71 A.4.6.1.17e Pemasangan Rangka Atap Genteng Beton, Kayu Kruing
72 A.4.6.1.19a Pemasangan Rangka Langit-langit (50x1,00) m, kayu Jati Ke
73 A.4.6.1.19b Pemasangan Rangka Langit-langit (50x1,00) m, kayu Jati Ke
74 A.4.6.1.19c Pemasangan Rangka Langit-langit (50x1,00) m, kayu Bengk
75 A.4.6.1.19d Pemasangan Rangka Langit-langit (50x1,00) m, kayu Kamfe
76 A.4.6.1.19e Pemasangan Rangka Langit-langit (50x1,00) m, kayu Kruin
77 A.4.6.1.19f Pemasangan Rangka Langit-langit (50x1,00) m, kayu Meran

CK Boyolali
NO. KODE URAIAN PEKERJAA

78 A.4.6.1.20a Pemasangan Rangka Langit-langit (60x60) cm, kayu Jati kel


79 A.4.6.1.20b Pemasangan Rangka Langit-langit (60x60) cm, kayu Jati kel
80 A.4.6.1.20c Pemasangan Rangka Langit-langit (60x60) cm, kayu Bengki
81 A.4.6.1.20d Pemasangan Rangka Langit-langit (60x60) cm, kayu Kamfer
81 A.4.6.1.20e Pemasangan Rangka Langit-langit (60x60) cm, kayu Kruing
82 A.4.6.1.20e Pemasangan Rangka Langit-langit (60x60) cm, kayu Merant
83 A.4.6.1.21a Pemasangan Listplank Uk. (3x20)cm Kayu Jati Kelas II
84 A.4.6.1.21b Pemasangan Listplank Uk. (3x20)cm Kayu Jati Kelas III
85 A.4.6.1.21c Pemasangan Listplank Uk. (3x20)cm Kayu Bengkirai
86 A.4.6.1.21d Pemasangan Listplank Uk. (3x20)cm Kayu Kamfer
87 A.4.6.1.21e Pemasangan Listplank Uk. (3x20)cm Kayu Kruing
88 A.4.6.1.22a Pemasangan Listplank Uk. (3x30)cm Kayu Jati Kelas II
89 A.4.6.1.22b Pemasangan Listplank Uk. (3x30)cm Kayu Jati Kelas III
90 A.4.6.1.22c Pemasangan Listplank Uk. (3x30)cm Kayu Bengkirai
91 A.4.6.1.22d Pemasangan Listplank Uk. (3x30)cm Kayu Kamfer
92 A.4.6.1.22e Pemasangan Listplank Uk. (3x30)cm Kayu Kruing
93 A.4.6.1.23a Pemasangan Rangka Dinding Pemisah (60x120) cm Kayu J
94 A.4.6.1.23b Pemasangan Rangka Dinding Pemisah (60x120) cm Kayu J
95 A.4.6.1.23c Pemasangan Rangka Dinding Pemisah (60x120) cm Kayu B
96 A.4.6.1.23d Pemasangan Rangka Dinding Pemisah (60x120) cm Kayu K
97 A.4.6.1.23e Pemasangan Rangka Dinding Pemisah (60x120) cm Kayu K
98 A.4.6.1.24a Pemasangan Dinding Pemisah Teakwood Rangkap Rangka K
99 A.4.6.1.24b Pemasangan Dinding Pemisah Teakwood Rangkap Rangka K
100 A.4.6.1.24c Pemasangan Dinding Pemisah Teakwood Rangkap Rangka K
101 A.4.6.1.24d Pemasangan Dinding Pemisah Teakwood Rangkap Rangka K
102 A.4.6.1.24e Pemasangan Dinding Pemisah Teakwood Rangkap Rangka K
103 A.4.6.1.25a Pemasangan Dinding Pemisah Plywood Rangkap Rangka Ka
104 A.4.6.1.25b Pemasangan Dinding Pemisah Plywood Rangkap Rangka Ka
105 A.4.6.1.25c Pemasangan Dinding Pemisah Plywood Rangkap Rangka Ka
106 A.4.6.1.25d Pemasangan Dinding Pemisah Plywood Rangkap Rangka Ka
107 A.4.6.1.25e Pemasangan Dinding Pemisah Plywood Rangkap Rangka Ka
108 A.4.6.1.26a Pemasangan Dinding Lambriziring dari Papan Jati Kelas II
109 A.4.6.1.26b Pemasangan Dinding Lambriziring dari Papan Jati Kelas III
110 A.4.6.1.26c Pemasangan Dinding Lambriziring dari Papan Bengkirai
111 A.4.6.1.26d Pemasangan Dinding Lambriziring dari Papan Kamfer
112 A.4.6.1.26e Pemasangan Dinding Lambriziring dari Papan Kruing
113 A.4.6.1.27 Pemasangan Dinding Lambriziring dari Plywood ukuran (1
114 A.4.6.1.28a Pemasangan Dinding Bilik, Rangka Kayu Kamfer
115 A.4.6.1.28b Pemasangan Dinding Bilik, Rangka Kayu Kruing
116 A.4.6.1.28c Pemasangan Dinding Bilik, Rangka Kayu Meranti
117 A.4.6.1.29 Pemasangan Rangka Langit-langit (1,00x1,00) m, kayu Jati
118 A.4.6.1.30 Pemasangan Rangka Langit-langit (1,00x1,00) m, kayu Jati
119 A.4.6.1.31 Pemasangan Rangka Langit-langit (1,00x1,00) m, kayu Ben
120 A.4.6.1.32 Pemasangan Rangka Langit-langit (1,00x1,00) m, kayu Kam
121 A.4.6.1.33 Pemasangan Rangka Langit-langit (1,00x1,00) m, kayu Kru

CK Boyolali
NO. KODE URAIAN PEKERJAA

122 A.4.6.1.34 Pemasangan Rangka Langit-langit (1,00x1,00) m, kayu Mer


123 A.4.7.1.35 Pasang Lisplank GRC 2/20
124 A.4.7.1.36 Pasang Lisplank GRC 2/30
125 A.4.6.1.37 Pembuatan&Memasang Konstruksi Kuda-kuda Kayu Jati ke
126 A.4.6.1.38 Pembuatan&Memasang Konstruksi Kuda-kuda Kayu Jati ke
127 A.4.6.1.39 Pembuatan&Memasang Konstruksi Kuda-kuda Kayu Bengk
128 A.4.6.1.40 Pembuatan&Memasang Konstruksi Kuda-kuda Kayu Kamfe
129 A.4.6.1.41 Pembuatan&Memasang Konstruksi Kuda-kuda Kayu Kruing

XII A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI dan KACA


1 A.4.6.2.2 Pemasangan Kunci Tanam Biasa
2 A.4.6.2.3 Pemasangan Kunci Kamar Mandi
3 A.4.6.2.4 Pemasangan Kunci Selinder
4 A.4.6.2.5 Pemasangan Engsel Pintu
5 A.4.6.2.6 Pemasangan Engsel Jendela Kupu-kupu
6 A.4.6.2.9 Pemasangan Kait Angin
7 A.4.6.2.11a Pemasangan Kunci Selot Sekelas Kuda Terbang
8 A.4.6.2.11b Pemasangan Kunci Selot Sekelas Anchor
9 A.4.6.2.15 Pemasangan Kunci Lemari
10 A.4.6.2.16 Pemasangan Kaca bening tebal 3 mm
11 A.4.6.2.17 Pemasangan Kaca bening tebal 5 mm
12 A.4.6.2.17a Pemasangan Kaca Rayban tebal 5 mm

CK Boyolali
NO. KODE URAIAN PEKERJAA

XIII A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN


1 A.4.7.1.1 Pengikisan / pengerokan Permukaan Cat Tembok Lama
2 A.4.7.1.4 Pengecatan Bidang Kayu Baru (1 lp Plamur, 1 lp Cat dasar, 2
3 A.4.7.1.5 Pengecatan Bidang Kayu Baru (1 lp Plamuur, 1 lp Cat dasar,
4 A.4.7.1.6 Pelaburan Bidang Kayu dg Teak Oil
5 A.4.7.1.7 Pelaburan Bidang Kayu dg Politur
6 A.4.7.1.8 Pelaburan Bidang Kayu dg Cat Residu & Ter
7 A.4.7.1.9 Pelaburan Bidang Kayu dg Vernis
8 A.4.7.1.10 Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar 2 lap. C
9 A.4.7.1.11 Pengecatan Tembok Lama (1lap.Plamir, 2lap Cat Penutup)
10 A.4.7.1.15 Pemasangan Wallpaper
11 A.4.7.1.16 Pengecatan Permukaan Baja dg Meni Besi
12 A.4.7.1.21 Pengecatan Permukaan Baja dg Meni Besi & Perancah
13 A.4.7.1.22 Pengecatan kayu bidang kayu lama

XIV A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG


1 A.5.1.1.1 Memasang Closet Duduk / Mono Blok
2 A.5.1.1.2 Memasang Closet Jongkok Porselen
3 A.5.1.1.4 Memasang Urinoir
4 A.5.1.1.5 Memasang Wastafel
5 A.5.1.1.7a Pemasangan Bak Fibreglass vol.0,4 m3
6 A.5.1.1.8 Memasang Bak Mandi Batu Bata Vol. 0,30 m3
7 A.5.1.1.14 Pemasangan Pipa Beton Ø 20 cm
8 A.5.1.1.15 Pemasangan Pipa Beton Ø 100 cm
9 A.5.1.1.16 Pemasangan Bak Kontrol Pas.Batu Bata 30x30 tinggi 35 cm
10 A.5.1.1.17 Pemasangan Bak Kontrol Pas.Batu Bata 45 x 45 tinggi 50 cm
11 A.5.1.1.18 Pemasangan Bak Kontrol Pas.Batu Bata 60x60 tinggi 60 cm
12 A.5.1.1.19 Pemasangan Pipa Galvanis Ø ½"
13 A.5.1.1.20 Pemasangan Pipa Galvanis Ø ¾"
14 A.5.1.1.21 Pemasangan Pipa Galvanis Ø 1"
15 A.5.1.1.22 Pemasangan Pipa Galvanis Ø 1½ "
16 A.5.1.1.23 Pemasangan Pipa Galvanis Ø 3"
17 A.5.1.1.24 Pemasangan Pipa Galvanis Ø 4"
18 A.5.1.1.25 Pemasangan Pipa PVC tipe AW Ø ½"
19 A.5.1.1.26 Pemasangan Pipa PVC tipe AW Ø ¾"
20 A.5.1.1.27 Pemasangan Pipa PVC tipe AW Ø 1"
21 A.5.1.1.28 Pemasangan Pipa PVC tipe AW Ø 1½"
22 A.5.1.1.29 Pemasangan Pipa PVC tipe AW Ø 2"
23 A.5.1.1.32 Pemasangan Pipa PVC tipe AW Ø 4"
24 A.5.1.1.33 Pemasangan Bak Cuci Piring
25 A.5.1.1.35 Pemasangan Kran Ø ½" atau Ø ¾"
26 A.5.1.1.36 Pemasangan Floor Drain
27 A.5.1.1.37 Pas. Buis beton dia 20 cm dengan rolag bata 1 : 4 (rolag pen
28 A.5.1.1.38 Pas. Buis beton dia 30 cm dengan rolag bata 1 : 4 (rolag pen
29 A.5.1.1.39 Pas. Buis beton dia 40 cm dengan rolag bata 1 : 4 (rolag pen
30 A.5.1.1.40 Pas. Buis beton dia 50 cm dengan rolag bata 1 : 4 (rolag pen
31 A.5.1.1.41 Pas. Buis beton dia 60 cm dengan rolag bata 1 : 4 (rolag pen
32 A.5.1.1.42 Pas. Buis beton dia 80 cm dengan rolag bata 1 : 4 (rolag pen
33 A.5.1.1.43 Pas. Buis beton dia 20 cm dengan cincin bata 1 : 4 (rolag pe

CK Boyolali
NO. KODE URAIAN PEKERJAA

34 A.5.1.1.44 Pas. Buis beton dia 30 cm dengan cincin bata 1 : 4 (rolag pe


35 A.5.1.1.45 Pas. Buis beton dia 40 cm dengan cincin bata 1 : 4 (rolag pe
36 A.5.1.1.46 Pas. Buis beton dia 50 cm dengan cincin bata 1 : 4 (rolag pe
37 A.5.1.1.47 Pas. Buis beton dia 60 cm dengan cincin bata 1 : 4 (rolag pe
38 A.5.1.1.48 Pas. Buis beton U 20 cm dengan cincin bata bata 1 : 4
39 A.5.1.1.49 Pas. Buis beton U 30 cm dengan cincin bata bata 1 : 4

Catatan : Harga belum termasuk PPN

Diperiksa,
KEPALA BIDANG CIPTA KARYA

Ir. SUHARTONO, MT.


Pembina
NIP. 19600305 199203 1 007

CK Boyolali
DAFTAR HARGA SATUAN PEKERJAAN GEDUNG
TAHUN 2015 KABUPATEN SUKOHARJO

HARGA SATUAN
URAIAN PEKERJAAN SAT PEKERJAAN
(Rp)

GA SATUAN PEKERJAAN PERSIAPAN


r Sementara dari Seng Gelombang Tinggi 2,00 m m' 330,468.88
ukuran dan Pemasangan Bouwplank m' 104,374.33
buatan Kantor Sementara dg Lantai Plesteran m2 1,001,657.80
buatan Gudang Semen dan Peralatan m2 887,849.88
bersihkan Lapangan dan Perataan m2 7,961.25
buatan Kotak Adukan ukuran 40cmx50cmx25cm bh 253,536.80
buatan Steger/Perancah dari Bambu m2 218,338.45
karan Beton Bertulang m3 652,614.93
karan Dinding Tembok Bata Merah m3 305,863.97
m2 5,235.45
urunkan usuk dan reng dari kayu m2 6,780.12
bongkar pyan m2 14,314.41
urunkan genteng m2 1,592.25

GA SATUAN PEKERJAAN TANAH


ggali Tanah Biasa Sedalam 1 m m3 35,858.63
ggali Tanah Biasa Sedalam 2 m m3 44,052.53
ggali Tanah Biasa Sedalam 3 m m3 52,382.72
ggali Tanah Keras Sedalam 1 m m3 47,720.64
ggali Tanah Cadas Sedalam 1 m m3 72,398.70
ggali Tanah Lumpur Sedalam 1 m m3 57,714.53
gerjakan Striping Tebing Setinggi 1 m m2 2,617.73
buang Tanah sejauh 30 m' m3 15,709.65
urugan Kembali m3 11,952.88
adatan Tanah (per 20 cm) m3 26,177.25
m3 152,943.45
asangan Lapisan Ijuk tebal 10 cm unt Bidang Resapan m2 21,053.18
gurug Sirtu Padat m3 163,568.63
an tanah padas m3 72,841.45

GA SATUAN PEKERJAAN PONDASI


asangan Pondasi Batu Belah 1SP : 3 PP m3 773,290.38
asangan Pondasi Batu Belah 1SP : 4 PP m3 723,034.13
asangan Pondasi Batu Belah 1SP : 5 PP m3 688,194.38
asangan Pondasi Batu Belah 1SP : 6 PP m3 663,700.13
asangan Pondasi Batu Belah 1SP : 8 PP m3 630,128.13
asangan Pondasi Batu Belah, 1 SP : 3 KP : 10 PP m3 599,285.23
asangan Pondasi Batu Belah, ¼ SP : 1KP : 4 PP m3 572,683.93
asang Batu Kosong/Anstamping m3 366,528.20
ng Pondasi Siklop, 60% Beton Camp. 1PC : 2PB : 3KR & 40% Batu Belah m3 2,199,060.05
ng Pondasi Sumuran diameter 100 cm m3 723,143.36

CK Boyolali
HARGA SATUAN
URAIAN PEKERJAAN SAT PEKERJAAN
(Rp)

GA SATUAN PEKERJAAN B E T O N
buat Beton mutu f'c=7,4 Mpa (K100), slum (12±2)cm, w/c = 0,87 m3 774,876.90
buat Beton mutu f'c=9,8 Mpa (K125), slum (12±2)cm, w/c = 0,78 m3 813,765.58
buat Beton mutu f'c=12,2 Mpa (K150), slum (12±2)cm, w/c = 0,72 m3 844,228.23
buat Lantai Kerja Beton mutu f'c=7,4 MPa (K100), slum (3-6)cm, w/c = 0,87 m3 729,443.18
buat Beton mutu f'c=14,5 MPa (K175), slum (12±2)cm, w/c = 0,66 m3 880,297.27
buat Beton mutu f'c=16,9 MPa (K200), slum (12±2)cm, w/c = 0,61 m3 914,670.12
buat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 m3 940,512.71
buat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56 m3 957,424.01
buat Lantai Kerja Beton mutu f'c=24,0 MPa (K275), slum (12±2)cm, w/c = 0,53 m3 986,446.58
buat Beton mutu f'c=26,4 MPa (K300), slum (12±2)cm, w/c = 0,52 m3 995,470.00
buat Beton mutu f'c=28,8 MPa (K325), slum (12±2)cm, w/c = 0,49 m3 1,056,879.57
buat Beton mutu f'c=31,2 MPa (K350), slum (12±2)cm, w/c = 0,48 m3 1,068,677.64
besian dg Besi Polos atau Besi Ulir Kg 12,651.43
asang Bekisting untuk Pondasi m2 134,820.73
asang Bekisting untuk Sloof m2 145,270.73
asang Bekisting untuk Kolom m2 269,547.47
asang Bekisting untuk Balok m2 277,137.47
asang Bekisting untuk Lantai m2 348,747.47
asang Bekisting untuk Dinding m2 303,097.47
asang Bekisting untuk Tangga m2 247,877.47
asang Jembatan Cor m2 85,462.96
buat Pondasi Beton Bertulang (150 kg Besi + Bekisting) m3 3,457,768.82
buat Sloof Beton Bertulang (200 kg Besi + Bekisting) m3 4,266,892.19
buat Kolom Beton Bertulang (300 kg Besi + Bekisting) m3 7,092,027.69
buat Balok Beton Bertulang (200 kg Besi + Bekisting) m3 5,453,115.42
buat plat beton bertulang (150 kg besi + bekisting) m3 5,026,366.95
buat Dinding Beton Bertulang (150 kg Besi + Bekisting) m3 4,801,748.82
buat Dinding Beton Bertulang (200 kg Besi + Bekisting) m3 5,092,332.19
buat Kolom Penguat Beton Bertulang (11 x 11) cm m' 60,411.62
buat Ring Balok Beton Bertulang (10 x 15) cm m' 82,087.23
buat Beton 1Pc : 2Ps : 3Kr m3 909,124.70
buat Beton 1Pc : 3Ps : 6Kr m3 696,804.35
buat Beton 1Pc : 3Ps : 5Kr m3 722,013.60

GA SATUAN PEKERJAAN BESI & ALLUMUNIUM


asangan Besi Profil Kg 23,537.20
asangan Rangka Kuda-kuda Baja IWF kg 25,913.20
buatan Pintu Besi Plat Baja tebal 2 mm rangkap, rangka baja Siku m2 464,919.84
erjaan Pengelasan dengan Las Listrik cm 2,383.60
asangan Pintu Rolling Door Besi m2 453,644.07
asangan Pintu Lipat (Folding Door) 0.8 mm m2 652,675.43
asangan Rolling Door Allumunium m2 607,153.25
asangan Kusen Pintu Allumunium Putih 4' m' 209,750.28

CK Boyolali
HARGA SATUAN
URAIAN PEKERJAAN SAT PEKERJAAN
(Rp)

asangan Kusen Pintu Allumunium Coklat 4' m' 161,350.28


asangan Pintu Kaca Rangka Allumunium Putih m2 848,474.99
asangan Pintu Kaca Rangka Allumunium Coklat m2 654,874.99
asangan Venetions Blinds & Vertical Blinds m2 146,482.71
asangan Terali Besi Strip (2x3) cm m2 273,909.39
asangan Jendela Nako rayban 5 mm & Tralis m2 129,386.35
asangan Jendela Nako bening 5 mm & Tralis m2 140,276.35
asangan Talang Datar/Jurai , Seng BJLS 30 Lebar 90 cm m' 161,322.15
asangan Talang 1/2 Lingkaran Ø 15 cm, Seng Plaat BJLS 30 Lebar 60 cm m' 60,014.46
asangan 1 m2 rangka besi hollow 1x40.40.2 mm, modul 60 x 120 cm, dinding partisi m2 78,122.39
asangan 1 m2 rangka besi hollow 1x40.40.2 mm, modul 60 x 60 cm, plafon m2 96,982.71

GA SATUAN PEKERJAAN PASANGAN DINDING


asangan Dinding Bata Merah ukuran (5x11x22) cm Tebal 1 bata Camp. 1SP: 2PP m2 223,928.93
asangan Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 3PP m2 210,645.74
asangan Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 4PP m2 201,636.74
asangan Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 5PP m2 197,068.30
asangan Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 6PP m2 195,694.68
asangan Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 3 KP :10PP m2 183,293.00
asangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 2PP m2 107,437.96
asangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 3PP m2 101,106.64
asangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 4PP m2 97,494.65
asangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 5PP m2 95,223.98
asangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 6PP m2 94,037.08
asangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 8PP m2 91,562.90
asangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 3KP : 10PP m2 91,887.40
asangan Dinding HB/CB 10, speci camp. 1SP : 3PP m2 154,232.93
asangan Dinding HB/CB 10, speci camp. 1SP : 4PP m2 154,659.04
asangan Dinding Terawang (Rooster) Uk, (12x11x24)cm Camp. 1SP : 3PP m2 243,081.03

GA SATUAN PEKERJAAN PLESTERAN


asangan Plesteran 1 Pc : 1 Pp Tebal 15 mm m2 51,386.34
asangan Plesteran 1 Pc : 2 Pp Tebal 15 mm m2 44,432.14
asangan Plesteran 1 Pc : 3 Pp Tebal 15 mm m2 41,441.02
asangan Plesteran 1 Pc : 4 Pp Tebal 15 mm m2 39,384.68
asangan Plesteran 1 Pc : 5 Pp Tebal 15 mm m2 38,238.04
asangan Plesteran 1 Pc : 6 Pp Tebal 15 mm m2 37,311.62
asangan Plesteran 1 Pc : 7 Pp Tebal 15 mm m2 36,808.92
asangan Plesteran 1 Pc : 8 Pp Tebal 15 mm m2 36,306.22
asangan Plesteran 1 Pc : 1/2 Kp : 3 Pp Tebal 15 mm m2 37,903.03
asangan Plesteran 1 Pc : 2 Kp : 8 Pp Tebal 15 mm m2 35,702.48
asangan Plesteran 1 Pc : 2 Pp Tebal 20 mm m2 59,446.97
asangan Plesteran 1Pc : 3Pp Tebal 20 mm m2 55,458.81
asangan Plesteran 1 Pc : 4 Pp Tebal 20 mm m2 52,649.19
asangan Plesteran 1Pc : 5Pp Tebal 20 mm m2 51,188.17

CK Boyolali
HARGA SATUAN
URAIAN PEKERJAAN SAT PEKERJAAN
(Rp)

asangan Plesteran 1Pc : 6Pp Tebal 20 mm m2 49,885.11


asangan Berapen 1 Pc : 5Pp Tebal 15 mm m2 25,648.43
asangan Plesteran Skoning 1 Pc : 2Pp, lebar 10 mm m' 35,659.31
asangan Plesteran Ciprat 1Pc : 2 Pp m2 29,351.58
asangan Finishing Siar Pasangan Dinding Bata Merah (=20 m') m2 17,303.11
asangan Finishing Siar Pasangan Dinding Conblock ekspose (=8 m') m2 8,332.45
asangan Finishing Siar Pas.Batu Kali Adukan 1Pc : 2Pp m2 37,089.80
asangan Acian m2 21,661.61

GA SATUAN PEKERJAAN PENUTUP LANTAI dan DINDING


asangan Lantai Keramik 30 x 30 cm polos m2 139,260.93
asangan Lantai Keramik 40 x 40 cm polos m2 144,189.93
asangan Lantai Keramik 40 x 40 cm warna pola m2 157,560.43
asangan Lantai Keramik Anti Selip 40 x 40 m2 158,775.93
asangan Lantai Keramik 20 x 20 cm m2 135,754.69
asangan Plint Keramik Ukuran 10x20 cm m1 67,534.25
asangan Lis Keramik 5x20 cm m1 72,197.22
asangan Lantai Karpet m2 153,503.63
asangan Dinding Keramik 20x20 cm, m2 149,054.62
asangan Dinding Keramik 20x25 cm, m2 149,054.62
asangan Dinding Batu Candi m2 203,400.86
asangan Dinding Batu Andesit m2 264,989.86
asangan Dinding Batu Andesit Alur m2 289,189.86
asangan Plint Kayu Jati kelas III (lebar 10 cm tebal 2 cm) m1 56,614.03
Paving abu-abu tebal 6 cm m2 69,015.98
Paving abu-abu tebal 8 cm m2 83,337.98
Paving abu-abu K.250 tebal 6 cm m2 95,465.48
Paving abu-abu K.250 tebal 8 cm m2 124,917.98
Paving abu-abu K.300 tebal 6 cm m2 101,240.48
Paving abu-abu K.300 tebal 8 cm m2 130,692.98

GA SATUAN PEKERJAAN LANGIT-LANGIT


asangan Langit-langit GRC (1,00x1,00) m m2 28,004.90
asang Langit-langit Tripleks Uk (120x240) cm, Tebal 4 mm m2 38,803.33
asang Langit-langit Tripleks Uk (120x240) cm, Tebal 3 mm m2 34,678.33
asang Langit-langit Lambriziring Kayu Jati Kelas II, tebal 9 mm m2 340,189.85
asang Langit-langit Lambriziring Kayu Jati Kelas III, tebal 9 mm m2 305,825.30
asang Langit-langit Lambriziring Kayu Bengkirai, tebal 9 mm m2 269,594.60
asang Langit-langit Lambriziring Kayu Kamfer, tebal 9 mm m2 224,415.95
asang Langit-langit Lambriziring Kayu Kruing, tebal 9 mm m2 195,344.60
asang Langit-langit Gypsum Board, Uk (120x240) tebal 9 mm m2 34,879.63
Langit-Langit Kayu Profil m1 14,029.24

GA SATUAN PEKERJAAN PENUTUP ATAP


asangan Atap Genteng Soka Kebumen m2 62,532.36

CK Boyolali
HARGA SATUAN
URAIAN PEKERJAAN SAT PEKERJAAN
(Rp)

asangan Atap Genteng Press Mantili Mojolaban m2 55,932.36


asangan Genteng Bubung Soka Kebumen m2 83,067.49
asangan Genteng Bubung Mantili Mojolaban m2 83,067.49
asangan Atap Asbes Gelombang (2,25x0,92 m) x 5 mm m2 57,559.32
asangan Atap Asbes Gelombang (2,00x0,92 m) x 5 mm m2 52,259.74
asangan Atap Asbes Gelombang (3,00x1,05 m) x 4 mm m2 43,437.74
asangan Atap Asbes Gelombang (2,10x1,05 m) x 4 mm m2 43,349.74
asangan Atap Genteng Beton m2 46,833.05
asangan Nok Genteng Beton m' 76,698.60
asangan Atap Seng Galvalum m2 77,234.63
asangan Atap Nok galvalum m' 27,984.99

GA SATUAN PEKERJAAN K A Y U
buatan & Pemasangan Kosen Pintu & Jendela Kayu Jati Kelas II m3 19,556,663.50
buatan & Pemasangan Kosen Pintu & Jendela Kayu Jati Kelas III m3 16,807,631.50
buatan & Pemasangan Kosen Pintu & Jendela Kayu Bengkirai m3 13,963,691.50
buatan & Pemasangan Kosen Pintu & Jendela Kayu Kamfer m3 11,347,583.50
buatan & Pemasangan Kosen Pintu & Jendela Kayu Kruing m3 9,079,691.50
buatan & Pemasangan Pintu Klamp Standard Kayu Jati Kelas II m2 738,576.41
buatan & Pemasangan Pintu Klamp Standard Kayu Jati Kelas III m2 646,937.61
buatan & Pemasangan Pintu Klamp Standard Kayu Bengkirai m2 550,322.41
buatan & Pemasangan Pintu Klamp Standard Kayu Kamfer m2 429,846.01
buatan & Pemasangan Pintu Klamp Standard Kayu Kruing m2 352,322.41
buatan & Pemasangan Daun Pintu Panel, Kayu Jati Kelas II m2 925,284.25
buatan & Pemasangan Daun Pintu Panel, Kayu Jati Kelas III m2 833,645.45
buatan & Pemasangan Daun Pintu Panel, Kayu Bengkirai m2 737,030.25
buatan & Pemasangan Daun Pintu Panel, Kayu Kamfer m2 616,553.85
buatan & Pemasangan Daun Pintu Panel, Kayu Kruing m2 539,030.25
buatan & Pemasangan Pintu & Jendela Kaca Kayu Jati Kelas II m2 610,209.60
buatan & Pemasangan Pintu & Jendela Kaca Kayu Jati Kelas III m2 555,226.32
buatan & Pemasangan Pintu & Jendela Kaca Kayu Bengkirai m2 497,257.20
buatan & Pemasangan Pintu & Jendela Kaca Kayu Kamfer m2 424,971.36
buatan & Pemasangan Pintu & Jendela Kaca Kayu Kruing m2 378,457.20
buatan & Pemasangan Pintu & Jendela Jalusi Kayu Jati Kelas II m2 1,310,156.65
buatan & Pemasangan Pintu & Jendela Jalusi Kayu Jati Kelas III m2 1,163,534.57
buatan & Pemasangan Pintu & Jendela Jalusi Kayu Bengkirai m2 1,008,950.25
buatan & Pemasangan Pintu & Jendela Jalusi Kayu Kamfer m2 816,188.01
buatan & Pemasangan Pintu & Jendela Jalusi Kayu Kruing m2 692,150.25
uatan&Pemasangan Pintu kayu lapis (Plywood) Rangkap rangka Kayu Jati Klas II (lbr s/d 90 cm) m2 660,722.43
uatan&Pemasangan Pintu kayu lapis (Plywood) Rangkap rangka Kayu Jati Klas III (lbr s/d 90 cm) m2 603,448.18
uatan&Pemasangan Pintu kayu lapis (Plywood) Rangkap rangka Kayu Bengkirai (lbr s/d 90 cm) m2 543,063.68
uatan&Pemasangan Pintu kayu lapis (Plywood) Rangkap rangka Kayu Kamfer (lbr s/d 90 cm) m2 467,765.93
uatan&Pemasangan Pintu kayu lapis (Plywood) Rangkap rangka Kayu Kruing (lbr s/d 90 cm) m2 419,313.68
buatan&Pemasangan Pintu Plywood rangkap, rangka expose kayu Jati kelas II m2 697,863.76
buatan&Pemasangan Pintu Plywood rangkap, rangka expose kayu Jati kelas III m2 639,214.93

CK Boyolali
HARGA SATUAN
URAIAN PEKERJAAN SAT PEKERJAAN
(Rp)

buatan&Pemasangan Pintu Plywood rangkap, rangka expose kayu Bengkirai m2 577,381.20


buatan&Pemasangan Pintu Plywood rangkap, rangka expose kayu Kamfer m2 500,276.30
buatan&Pemasangan Pintu Plywood rangkap, rangka expose kayu Kruing m2 450,661.20
buatan & Pemasangan Jalusi mati Kosen Kayu Jati Kelas II m2 1,168,663.38
buatan & Pemasangan Jalusi mati Kosen Kayu Jati Kelas III m2 1,031,205.18
buatan & Pemasangan Jalusi mati Kosen Kayu Bengkirai m2 886,282.38
buatan & Pemasangan Jalusi mati Kosen Kayu Kamfer m2 705,567.78
buatan & Pemasangan Jalusi mati Kosen Kayu Kruing m2 589,282.38
buatan & Pemasangan Pintu Teakwood Rangkap, Rangka Expose Kayu Jati Kelas II m2 684,787.95
buatan & Pemasangan Pintu Teakwood Rangkap, Rangka Expose Kayu Jati Kelas III m2 627,513.70
buatan & Pemasangan Pintu Teakwood Rangkap, Rangka Expose Kayu Bengkirai m2 567,129.20
buatan & Pemasangan Pintu Teakwood Rangkap, Rangka Expose Kayu Kamfer m2 491,831.45
buatan & Pemasangan Pintu Teakwood Rangkap, Rangka Expose Kayu Kruing m2 443,379.20
buatan&Pemasangan Pintu Teakwood Rangkap Lapis Formika,Rangka expose Kayu Kamfer m2 555,510.29
buatan&Memasang Konstruksi Kuda-kuda Konvensional Kayu Jati Kelas II Bentang 6 meter m3 17,634,562.00
buatan&Memasang Konstruksi Kuda-kuda Konvensional Kayu Jati Kelas III Bentang 6 meter m3 15,114,616.00
buatan&Memasang Konstruksi Kuda-kuda Konvensional Kayu Bengkirai Bentang 6 meter m3 12,507,671.00
buatan&Memasang Konstruksi Kuda-kuda Konvensional Kayu Kamfer Bentang 6 meter m3 10,109,572.00
buatan&Memasang Konstruksi Kuda-kuda Konvensional Kayu Kruing Bentang 6 meter m3 8,030,671.00
buatan&Pemasangan Konstruksi Kuda-kuda Expose, Kayu Jati Kelas II m3 19,866,670.18
buatan&Pemasangan Konstruksi Kuda-kuda Expose, Kayu Jati Kelas III m3 17,117,638.18
buatan&Pemasangan Konstruksi Kuda-kuda Expose, Kayu Bengkirai m3 14,273,698.18
buatan&Pemasangan Konstruksi Kuda-kuda Expose, Kayu Kamfer m3 11,657,590.18
buatan&Pemasangan Konstruksi Kuda-kuda Expose, Kayu Kruing m3 9,389,698.18
asangan konstruksi Gording, Kayu Klas Jati Kelas II m3 17,154,209.60
asangan konstruksi Gording, Kayu Klas Jati Kelas III m3 14,634,263.60
asangan konstruksi Gording, Kayu Klas Bengkirai m3 12,027,318.60
asangan konstruksi Gording, Kayu Klas Kamfer m3 9,629,219.60
asangan konstruksi Gording, Kayu Klas Kruing m3 7,550,318.60
asangan Rangka Atap Genteng Keramik, Kayu Klas Jati Kelas II m2 259,258.37
asangan Rangka Atap Genteng Keramik, Kayu Klas Jati Kelas III m2 227,186.33
asangan Rangka Atap Genteng Keramik, Kayu Bengkirai m2 167,886.04
asangan Rangka Atap Genteng Keramik, Kayu Kamfer m2 157,964.74
asangan Rangka Atap Genteng Keramik, Kayu Kruing m2 121,622.33
asangan Rangka Atap Genteng Beton, Kayu Jati kelas II m2 293,759.08
asangan Rangka Atap Genteng Beton, Kayu Jati kelas III m2 261,687.04
asangan Rangka Atap Genteng Beton, Kayu Bengkirai m2 188,585.75
asangan Rangka Atap Genteng Beton, Kayu Kamfer m2 186,944.42
asangan Rangka Atap Genteng Beton, Kayu Kruing m2 143,798.33
asangan Rangka Langit-langit (50x1,00) m, kayu Jati Kelas II m2 266,965.15
asangan Rangka Langit-langit (50x1,00) m, kayu Jati Kelas III m2 231,685.91
asangan Rangka Langit-langit (50x1,00) m, kayu Bengkirai m2 195,188.68
asangan Rangka Langit-langit (50x1,00) m, kayu Kamfer m2 161,615.29
asangan Rangka Langit-langit (50x1,00) m, kayu Kruing m2 132,510.68
asangan Rangka Langit-langit (50x1,00) m, kayu Meranti m2 107,100.68

CK Boyolali
HARGA SATUAN
URAIAN PEKERJAAN SAT PEKERJAAN
(Rp)

asangan Rangka Langit-langit (60x60) cm, kayu Jati kelas II m2 278,984.45


asangan Rangka Langit-langit (60x60) cm, kayu Jati kelas III m2 241,643.44
asangan Rangka Langit-langit (60x60) cm, kayu Bengkirai m2 203,013.25
asangan Rangka Langit-langit (60x60) cm, kayu Kamfer m2 167,477.78
asangan Rangka Langit-langit (60x60) cm, kayu Kruing m2 136,672.25
asangan Rangka Langit-langit (60x60) cm, kayu Meranti m2 109,777.25
asangan Listplank Uk. (3x20)cm Kayu Jati Kelas II m1 194,710.51
asangan Listplank Uk. (3x20)cm Kayu Jati Kelas III m1 169,968.03
asangan Listplank Uk. (3x20)cm Kayu Bengkirai m1 143,881.93
asangan Listplank Uk. (3x20)cm Kayu Kamfer m1 111,353.30
asangan Listplank Uk. (3x20)cm Kayu Kruing m1 90,421.93
asangan Listplank Uk. (3x30)cm Kayu Jati Kelas II m1 197,147.78
asangan Listplank Uk. (3x30)cm Kayu Jati Kelas III m1 171,947.11
asangan Listplank Uk. (3x30)cm Kayu Bengkirai m1 145,377.93
asangan Listplank Uk. (3x30)cm Kayu Kamfer m1 112,246.92
asangan Listplank Uk. (3x30)cm Kayu Kruing m1 90,927.93
asangan Rangka Dinding Pemisah (60x120) cm Kayu Jati Kelas II m2 460,566.04
asangan Rangka Dinding Pemisah (60x120) cm Kayu Jati Kelas III m2 396,421.96
asangan Rangka Dinding Pemisah (60x120) cm Kayu Bengkirai m2 330,063.36
asangan Rangka Dinding Pemisah (60x120) cm Kayu Kamfer m2 269,020.84
asangan Rangka Dinding Pemisah (60x120) cm Kayu Kruing m2 216,103.36
asangan Dinding Pemisah Teakwood Rangkap Rangka Kayu Jati kelas II m2 545,917.24
asangan Dinding Pemisah Teakwood Rangkap Rangka Kayu Jati kelas III m2 481,773.16
asangan Dinding Pemisah Teakwood Rangkap Rangka Kayu Bengkirai m2 415,414.56
asangan Dinding Pemisah Teakwood Rangkap Rangka Kayu Kamfer m2 354,372.04
asangan Dinding Pemisah Teakwood Rangkap Rangka Kayu Kruing m2 301,454.56
asangan Dinding Pemisah Plywood Rangkap Rangka Kayu Jati Kelas II m2 551,445.73
asangan Dinding Pemisah Plywood Rangkap Rangka Kayu Jati Kelas III m2 487,301.65
asangan Dinding Pemisah Plywood Rangkap Rangka Kayu Bengkirai m2 420,943.05
asangan Dinding Pemisah Plywood Rangkap Rangka Kayu Kamfer m2 359,900.53
asangan Dinding Pemisah Plywood Rangkap Rangka Kayu Kruing m2 306,983.05
asangan Dinding Lambriziring dari Papan Jati Kelas II m2 281,898.10
asangan Dinding Lambriziring dari Papan Jati Kelas III m2 265,861.31
asangan Dinding Lambriziring dari Papan Bengkirai m2 248,953.65
asangan Dinding Lambriziring dari Papan Kamfer m2 227,870.28
asangan Dinding Lambriziring dari Papan Kruing m2 214,303.65
asangan Dinding Lambriziring dari Plywood ukuran (120x240) cm m2 35,301.20
asangan Dinding Bilik, Rangka Kayu Kamfer m2 158,325.37
asangan Dinding Bilik, Rangka Kayu Kruing m2 131,192.11
asangan Dinding Bilik, Rangka Kayu Meranti m2 112,712.11
asangan Rangka Langit-langit (1,00x1,00) m, kayu Jati kelas II m2 211,025.60
asangan Rangka Langit-langit (1,00x1,00) m, kayu Jati kelas III m2 183,535.28
asangan Rangka Langit-langit (1,00x1,00) m, kayu Bengkirai m2 155,095.88
asangan Rangka Langit-langit (1,00x1,00) m, kayu Kamfer m2 128,934.80
asangan Rangka Langit-langit (1,00x1,00) m, kayu Kruing m2 106,255.88

CK Boyolali
HARGA SATUAN
URAIAN PEKERJAAN SAT PEKERJAAN
(Rp)

asangan Rangka Langit-langit (1,00x1,00) m, kayu Meranti m2 86,455.88


ng Lisplank GRC 2/20 m1 29,304.50
ng Lisplank GRC 2/30 m1 36,523.25
buatan&Memasang Konstruksi Kuda-kuda Kayu Jati kelas II m3 17,560,642.00
buatan&Memasang Konstruksi Kuda-kuda Kayu Jati kelas III m3 15,040,696.00
buatan&Memasang Konstruksi Kuda-kuda Kayu Bengkirai m3 12,433,751.00
buatan&Memasang Konstruksi Kuda-kuda Kayu Kamfer m3 10,035,652.00
buatan&Memasang Konstruksi Kuda-kuda Kayu Kruing m3 7,956,751.00

GA SATUAN PEKERJAAN KUNCI dan KACA


asangan Kunci Tanam Biasa Buah 180,135.73
asangan Kunci Kamar Mandi Buah 89,284.11
asangan Kunci Selinder Buah 179,374.11
asangan Engsel Pintu Buah 21,526.59
asangan Engsel Jendela Kupu-kupu Buah 17,051.07
asangan Kait Angin Buah 15,180.66
asangan Kunci Selot Sekelas Kuda Terbang Buah 70,512.15
asangan Kunci Selot Sekelas Anchor Buah 187,772.15
asangan Kunci Lemari Buah 25,581.09
asangan Kaca bening tebal 3 mm m2 81,016.61
asangan Kaca bening tebal 5 mm m2 106,426.61
asangan Kaca Rayban tebal 5 mm m2 119,736.61

CK Boyolali
HARGA SATUAN
URAIAN PEKERJAAN SAT PEKERJAAN
(Rp)

GA SATUAN PEKERJAAN PENGECATAN


ikisan / pengerokan Permukaan Cat Tembok Lama m2 8,531.44
ecatan Bidang Kayu Baru (1 lp Plamur, 1 lp Cat dasar, 2 Lp Cat Penutup) m2 44,439.01
ecatan Bidang Kayu Baru (1 lp Plamuur, 1 lp Cat dasar, 3 Lp Cat Penutup) m2 56,619.75
buran Bidang Kayu dg Teak Oil m2 26,851.77
buran Bidang Kayu dg Politur m2 43,721.32
buran Bidang Kayu dg Cat Residu & Ter m2 10,660.87
buran Bidang Kayu dg Vernis m2 27,135.30
ecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar 2 lap. Cat Penutup) m2 13,370.31
ecatan Tembok Lama (1lap.Plamir, 2lap Cat Penutup) m2 9,737.61
asangan Wallpaper m2 64,916.36
ecatan Permukaan Baja dg Meni Besi m2 17,123.78
ecatan Permukaan Baja dg Meni Besi & Perancah m2 35,200.14
ecatan kayu bidang kayu lama m2 10,957.07

GA SATUAN PEKERJAAN SANITASI DALAM GEDUNG


asang Closet Duduk / Mono Blok Unit 1,353,486.20
asang Closet Jongkok Porselen Unit 311,824.70
asang Urinoir Unit 1,776,931.75
asang Wastafel Unit 495,437.25
asangan Bak Fibreglass vol.0,4 m3 Unit 810,604.30
asang Bak Mandi Batu Bata Vol. 0,30 m3 Unit 1,058,336.95
asangan Pipa Beton Ø 20 cm m' 79,202.59
asangan Pipa Beton Ø 100 cm m' 640,483.47
asangan Bak Kontrol Pas.Batu Bata 30x30 tinggi 35 cm bh 303,420.32
asangan Bak Kontrol Pas.Batu Bata 45 x 45 tinggi 50 cm bh 451,036.63
asangan Bak Kontrol Pas.Batu Bata 60x60 tinggi 60 cm bh 599,157.68
asangan Pipa Galvanis Ø ½" m' 35,914.62
asangan Pipa Galvanis Ø ¾" m' 41,541.12
asangan Pipa Galvanis Ø 1" m' 57,056.62
asangan Pipa Galvanis Ø 1½ " m' 99,691.63
asangan Pipa Galvanis Ø 3" m' 183,226.12
asangan Pipa Galvanis Ø 4" m' 259,269.12
asangan Pipa PVC tipe AW Ø ½" m' 12,338.59
asangan Pipa PVC tipe AW Ø ¾" m' 14,810.84
asangan Pipa PVC tipe AW Ø 1" m' 18,348.72
asangan Pipa PVC tipe AW Ø 1½" m' 19,573.51
asangan Pipa PVC tipe AW Ø 2" m' 29,803.51
asangan Pipa PVC tipe AW Ø 4" m' 87,498.90
asangan Bak Cuci Piring buah 332,210.18
asangan Kran Ø ½" atau Ø ¾" bh 51,029.28
asangan Floor Drain buah 11,516.73
Buis beton dia 20 cm dengan rolag bata 1 : 4 (rolag penuh) m2 212,501.09
Buis beton dia 30 cm dengan rolag bata 1 : 4 (rolag penuh) m2 270,632.42
Buis beton dia 40 cm dengan rolag bata 1 : 4 (rolag penuh) m2 322,311.88
Buis beton dia 50 cm dengan rolag bata 1 : 4 (rolag penuh) m2 391,615.90
Buis beton dia 60 cm dengan rolag bata 1 : 4 (rolag penuh) m2 480,907.52
Buis beton dia 80 cm dengan rolag bata 1 : 4 (rolag penuh) m2 616,904.77
Buis beton dia 20 cm dengan cincin bata 1 : 4 (rolag penuh) m2 104,951.80

CK Boyolali
HARGA SATUAN
URAIAN PEKERJAAN SAT PEKERJAAN
(Rp)

Buis beton dia 30 cm dengan cincin bata 1 : 4 (rolag penuh) m2 139,053.25


Buis beton dia 40 cm dengan cincin bata 1 : 4 (rolag penuh) m2 168,716.02
Buis beton dia 50 cm dengan cincin bata 1 : 4 (rolag penuh) m2 215,874.10
Buis beton dia 60 cm dengan cincin bata 1 : 4 (rolag penuh) m2 280,450.51
Buis beton U 20 cm dengan cincin bata bata 1 : 4 m2 85,663.06
Buis beton U 30 cm dengan cincin bata bata 1 : 4 m2 94,374.01

m termasuk PPN
Sukoharjo, 2015

Direncana
KASI BINA TEKNIS
BIDANG CIPTA KARYA

Ir. JOKO PRASENO


NIP. 19670209 199803 1 004

Mengetahui
KEPALA DINAS PEKERJAAN UMUM
KABUPATEN SUKOHARJO

Ir. ACHMAD HUFRONI, MT


Pembina Tingkat I
NIP. 19581120 199103 1 004

CK Boyolali
DAFTAR UPAH PEKERJA
TAHUN 2015 KABUPATEN SUKOHARJO

NO. JENIS BAHAN SATUAN HARGA (Rp)

1 Pekerja Hr
2 Mandor Hr
3 Tukang listrik Hr
4 Tukang kayu Hr
5 Kep. tk. kayu Hr
6 Tukang batu Hr
7 Kep. tk. batu Hr
8 Tukang besi Hr
9 Kep. tk. besi Hr
10 Tukang cat Hr
11 Kep. tk. cat Hr
12 Tukang plitur Hr
13 Tukang jalan Hr
14 Tukang gali Hr
15 Tukang masak aspal Hr
16 Tk. leideng Hr
17 Masinis Hr
18 Pemb. Masinis Hr
19 Penjaga api Hr
20 Penjaga malam Hr
21 Sopir Hr
22 Pembantu Sopir Hr

Sukoharjo, 2015

Diperiksa, Direncana
KEPALA BIDANG CIPTA KARYA KASI BINA TEKNIS
BIDANG CIPTA KARYA

Ir. SUHARTONO, MT. Ir. JOKO PRASENO


Pembina NIP. 19670209 199803 1 004
NIP. 19600305 199203 1 007
Mengetahui
KEPALA DINAS PEKERJAAN UMUM
KABUPATEN SUKOHARJO

Ir. ACHMAD HUFRONI, MT


Pembina Tingkat I
NIP. 19581120 199103 1 004

CK Boyolali
DAFTAR UPAH PEKERJA
TAHUN 2015 KABUPATEN SUKOHARJO

HARGA (Rp)

41,400.00
61,950.00
61,950.00
61,950.00
66,100.00
57,850.00
66,100.00
57,850.00
66,100.00
57,850.00
66,100.00
57,850.00
57,850.00
57,850.00
57,850.00
57,850.00
61,950.00
49,550.00
49,550.00
49,550.00
49,550.00
41,300.00

Sukoharjo, 2015

KASI BINA TEKNIS


BIDANG CIPTA KARYA

Ir. JOKO PRASENO


NIP. 19670209 199803 1 004

Mengetahui
KEPALA DINAS PEKERJAAN UMUM
KABUPATEN SUKOHARJO

Ir. ACHMAD HUFRONI, MT


Pembina Tingkat I
NIP. 19581120 199103 1 004

CK Boyolali
DAFTAR HARGA SATUAN BAHAN B
TAHUN 2015 KABUPATEN SUKOH

NO. J E N I S B A H A N

I BAHAN DASAR
1 BATU KALI Bulat Belah
Pecah
Pecah
Pecah
2 KERIKIL Timbunan Pilihan
Sawur / Koral
Beton
Beton
Beton
3 BATU BATA
4 PASIR Urug
Pasang
Beton
5 TANAH Padas
6 KAPUR Pasang
7 PORTLAND CEMENT
Portland Cement
Semen warna

II BAHAN PENUTUP ATAP


1 GENTENG BETON
Kerpus Beton Warna Standard
Genteng press beton polos tipe nusant

2 GENTENG TANAH LIAT


Vlaam
Nok kerpus plentong super
Kerpus press beton
Kerpus press mantili
Kerpus press tipe soka kebumen
Genteng soka kebumen plentong besa
Genteng soka kebumen plentong kecil
Genteng press mantili besar
Genteng press mantili kecil

3 ASBES GELOMBANG BESAR


Asbes Gelombang Kecil
. 150 cm X 105 cm X 4 mm
. 180 cm X 105 cm X 4 mm
. 210 cm X 105 cm X 4 mm

CK Boyolali
NO. J E N I S B A H A N

. 240 cm X 105 cm X 4 mm
. 270 cm X 105 cm X 4 mm
. 300 cm X 105 cm X 4 mm
.(2,25x0,92 m) x 5 mm
(2,00x0,92 m) x 5 mm
4 NOK Jabes nok
. Stel Besar
5 ASBES PLAT . 100cm X 100 cm X 3 mm
6 SENG PLAT BJLS 0,28 lebar 55 cm
BJLS 0,30 lebar 60 cm
BJLS 0,30 lebar 90 cm
7 SENG GELOMBANG
BJLS 0,20 panjang 180 cm
BJLS 0,30 panjang 180 cm
BJLS 0,30 panjang 240 cm
Seng gelombang 3 x 6" BJLS.20, 2,4 x

III BAHAN KAYU


1 JATI
Balok kelas II
Balok kelas III
Papan kelas II
Papan kelas III

CK Boyolali
NO. J E N I S B A H A N

2 KAMPER Papan
Balok/pesagen

3 KRUING Papan
Balok/pesagen

4 MERANTI Papan
Balok/pesagen

5 KAYU TAHUN BEKISTING Papan


Balok/pesagen

6 BENGKIRAI Papan
Balok/pesagen

7 SENGON Papan
Balok/pesagen

8 DOLKEN Sedang 8 - 10 x 400 cm

9 LAIN -LAIN Bilik Bambu


Bambu
Reng bangkirai 2/3
Reng bangkirai
Reng jati 2/3
Reng jati kelas II
Reng jati kelas III
Kayu usuk bangkirai
Kayu usuk kruing

IV BAHAN PENUTUP DINDING / LANTAI


1 Keramik 30 X 30 cm polos
40 X 40 cm polos
20 X 20 cm KM/WC
Keramik anti slip 40/40
Keramik warna pola 30/30
Keramik warna pola 40/40
Keramik dinding 20/25
Keramik dinding 20/20
Keramik dinding list 5/20
Keramik plin 10/20
2 Karpet
3 Parquet Jati
4 Wallpaper

CK Boyolali
NO. J E N I S B A H A N

5 Batu Candi
6 Batu andesit
7 Batu andesit alur
8 GRANITO 40 x 40 cm
9 Marmer
10 Batu candi

V.BAHAN CETAK
1 BUIS BETON Ø 10 cm - 100 cm
Ø 20 cm - 100 cm
Ø 30 cm - 100 cm
Ø 40 cm - 100 cm
Ø 50 cm - 100 cm
Ø 60 cm - 100 cm
Ø 100 cm - 100 cm
Ø 80 cm - 50 cm
Ø 90 cm - 50 cm
Ø 100 cm - 50 cm
U 20 cm - 100 cm
U 30 cm - 100 cm

2 LUBANG ANGIN (ROSTER) PC + PASIR 10 X 20 cm

III BAHAN BESI


1 BESI BETON besi beton polos
besi beton ulir

CK Boyolali
NO. J E N I S B A H A N

2 BESI PLAT Besi Strip


3 BESI PROFIL Besi Profil
Besi Profil WF
5 BESI SIKU L All Size
6 KAWAT - Ikat beton/bendrat
- Kawat las
7 LAIN-LAIN
Paku asbes
Paku sekrup asbes
Skrup Fixer
Sealant
Venetions Blinds atau Vertical Blinds (tirai)

IV BAHAN PIPA
1 Pipa PVC SII SCJ , S - 12,5 (10 bar)
Pipa PVC DN 20 ( ½" ) AW JIS
Pipa PVC DN 25 ( ¾" ) AW JIS
Pipa PVC DN 32 ( 1" ) AW JIS
Pipa PVC DN 40 ( 1½" )
Pipa PVC DN 63 ( 2" )
Pipa PVC DN 110 ( 4" )
Pipa PVC Ø 4" (AW - SCJ) 4 m
Pipa PVC Ø 2" (AW - SCJ) 4 m
Pipa PVC Ø 1 1/2" (AW - SCJ) 4 m
Pipa PVC Ø 1" (AW - SCJ) 4 m
Pipa PVC Ø 3/4" (AW - SCJ) 4 m
Pipa PVC Ø 1/2" (AW - SCJ) 4 m

2 Pipa Medium B Galvanis - SII


Pipa Medium B Galvanis 1/2"
Pipa Medium B Galvanis 3/4"
Pipa Medium B Galvanis 1"
Pipa Medium B Galvanis 1 1/2"
Pipa Medium B Galvanis 3"
Pipa Medium B Galvanis 4"

V BAHAN LANGIT - LANGIT


1 List Kayu Profil
2 Gypsum tebal 9 mm
3 Lisplank GRC 20 cm
4 Lisplank GRC 30 cm

5 PLY WOOD
Teak wood

CK Boyolali
NO. J E N I S B A H A N

. 120 X 240 X 3 mm
. 90 X 210 X 4 mm
Tripleks
. 120 X 240 X 3 mm
. 120 X 240 X 4 mm
Multipleks
. 120 X 240 X 9 mm
. 120 X 240 X 12 mm
Formika ukuran pintu
Eternit
GRC (1,2 x 2,4 m2 tb 4 mm)
Plywood tebal 4 mm uk.90x220cm
Plywood tebal 4 mm uk.120x240cm

VI BAHAN FINISHING
1 KAYU
Menie
Dempul plamur
Ambril/amplas
Cat dasar
- Koas
. Plitur jadi
. Vernis

CK Boyolali
NO. J E N I S B A H A N

2 TEMBOK
Plamur
Cat tembok

3 BESI
Menie
Cat
Minyak cat
Residu (teer/aspal)
Lem Aica Aibon

VII B A H A N K A C A
1 POLOS 3 mm
5 mm
2 RAY BAND 5 mm

VIII ALAT - ALAT PENGUNCI & PENGGANTUNG


1 KUNCI TANAM Yale :

Kuda :

2 KUNCI SLOOD Sekelas Kuda Terbang


Sekelas Anchor
Kunci Lemari
3 ENGSEL DAN GERENDEL
Engsel Angin
Kupu-kupu biasa
Grendel biasa
Kait Angin
Door Stop

IX BAHAN SANITAIR
1 KLOSET DUDUK
2 KLOSET JONGKOK
3 WASTAFEL GANTUNG BULAT
4 URINOIR KERAMIK STANDART
5 BAK MANDI FIBRE GLASS 70.70.80
6 LAIN - LAIN
Kran Air 3/4"
Seal tape
Floor drain
Bak Cuci Piring
Water drain

CK Boyolali
NO. J E N I S B A H A N

XI ALAT PENGIKAT KAYU


1 PAKU - ukuran 1" s/d 4"
2 PAKU - sekrup
3 PAKU - sekrup
4 LEM KAYU
5 Tali Ijuk
6 Paku Pancing 60 x 230

XII PAVING BLOCK


1 Batako
2 Paving block natural 6 cm ( K- 175 )
3 Paving block natural 8 cm ( K-175 )
4 Paving abu-abu tebal 6 cm
5 Paving abu-abu tebal 8 cm
6 Paving abu-abu K.250 tebal 6 cm
7 Paving abu-abu K.250 tebal 8 cm
8 Paving abu-abu K.300 tebal 6 cm
9 Paving abu-abu K.300 tebal 8 cm

XIII L A I N - L A I N
1 Naco rayban 5 mm per Daun
2 Naco bening 5 mm per Daun
3 Rolling door Besi
4 Rolling door Almunium
5 Kusen Almunium 4" Putih
6 Kusen Almunium 4" Coklat
7 Besi Holo rangka gypsum
8 Minyak Beton & bekisting
9 Pintu Lipat Besi 0.8 mm
10 Soda api
11 Air
12 Solar (Industri)
13 Premium (Industri)
14 Pelumas

XIV BAHAN ALUMUNIUM


1 Alumunium Profil Warna Silver 4" tebal 1.2 mm
Warna Coklat 4" tebal 1.2 mm

Diperiksa,
KEPALA BIDANG CIPTA KARYA

CK Boyolali
NO. J E N I S B A H A N

Ir. SUHARTONO, MT.


Pembina
NIP. 19600305 199203 1 007
Mengetahui
KEPALA DINAS PEKERJAAN UMUM
KABUPATEN SUKOHARJO

Ir. ACHMAD HUFRONI, MT


Pembina Tingkat I
NIP. 19581120 199103 1 004

CK Boyolali
DAFTAR HARGA SATUAN BAHAN BANGUNAN
TAHUN 2015 KABUPATEN SUKOHARJO

J E N I S B A H A N SATUAN HARGA (Rp)

Bulat Belah m3 190,000.00


10/15 m3 190,000.00
5/7 m3 200,000.00
3/5 m3 198,300.00
Timbunan Pilihan m3 114,000.00
Sawur / Koral m3 84,200.00
0,5/1 m3 101,600.00
1/2 m3 214,850.00
2/3 m3 206,000.00
bh 650.00
m3 105,000.00
m3 185,000.00
m3 185,000.00
m3 42,500.00
m3 198,000.00

Portland Cement kg 1,337.50


Semen warna kg 1,755.00

Kerpus Beton Warna Standard bh 4,900.00


Genteng press beton polos tipe nusantara bh 2,400.00

bh 400.00
Nok kerpus plentong super bh 2,400.00
Kerpus press beton bh 4,900.00
Kerpus press mantili bh 5,700.00
Kerpus press tipe soka kebumen bh 5,700.00
Genteng soka kebumen plentong besar bh 2,500.00
Genteng soka kebumen plentong kecil bh 1,700.00
Genteng press mantili besar bh 1,950.00
Genteng press mantili kecil bh 1,350.00

Asbes Gelombang Kecil


. 150 cm X 105 cm X 4 mm bh 40,000.00
. 180 cm X 105 cm X 4 mm bh 46,000.00
. 210 cm X 105 cm X 4 mm bh 52,000.00

CK Boyolali
J E N I S B A H A N SATUAN HARGA (Rp)

. 240 cm X 105 cm X 4 mm bh 60,000.00


. 270 cm X 105 cm X 4 mm bh 68,000.00
. 300 cm X 105 cm X 4 mm bh 76,000.00
.(2,25x0,92 m) x 5 mm bh 65,000.00
(2,00x0,92 m) x 5 mm bh 57,700.00
Jabes nok
. Stel Besar bh 31,400.00
. 100cm X 100 cm X 3 mm bh 17,300.00
BJLS 0,28 lebar 55 cm lbr 33,000.00
BJLS 0,30 lebar 60 cm m' 23,900.00
BJLS 0,30 lebar 90 cm m' 34,700.00

BJLS 0,20 panjang 180 cm lbr 47,900.00


BJLS 0,30 panjang 180 cm lbr 59,500.00
BJLS 0,30 panjang 240 cm lbr 79,300.00
Seng gelombang 3 x 6" BJLS.20, 2,4 x 0,8 lbr 50,400.00

Balok kelas II m3 13,537,100.00


Balok kelas III m3 11,454,500.00
Papan kelas II m3 14,578,500.00
Papan kelas III m3 12,495,800.00

CK Boyolali
J E N I S B A H A N SATUAN HARGA (Rp)

m3 7,561,900.00
Balok/pesagen m3 7,318,100.00

m3 5,800,000.00
Balok/pesagen m3 5,600,000.00

m3 4,600,000.00
Balok/pesagen m3 4,100,000.00

m3
Balok/pesagen m3 1,900,000.00

m3 10,300,000.00
Balok/pesagen m3 9,300,000.00

m3 3,000,000.00
Balok/pesagen m3 2,300,000.00

Sedang 8 - 10 x 400 cm bt 18,000.00


bt 13,200.00
Bilik Bambu m2 20,000.00
m 3,300.00
Reng bangkirai 2/3 m3 5,227,200.00
Reng bangkirai m 5,700.00
Reng jati 2/3 m3 8,712,300.00
Reng jati kelas II m3 8,712,300.00
Reng jati kelas III m3 8,712,300.00
Kayu usuk bangkirai m3 8,500,000.00
Kayu usuk kruing m3 5,400,000.00

30 X 30 cm polos m2 45,000.00
40 X 40 cm polos m2 48,000.00
20 X 20 cm KM/WC m2 42,100.00
Keramik anti slip 40/40 m2 60,000.00
Keramik warna pola 30/30 m2 42,100.00
Keramik warna pola 40/40 m2 59,000.00
Keramik dinding 20/25 m2 44,600.00
Keramik dinding 20/20 m2 44,600.00
Keramik dinding list 5/20 bh 4,000.00
Keramik plin 10/20 bh 3,000.00
m2 110,000.00
m2 160,000.00
m2 35,000.00

CK Boyolali
J E N I S B A H A N SATUAN HARGA (Rp)

m2 99,100.00
m2 150,000.00
m2 170,000.00
40 x 40 cm m2 157,000.00
m2 98,000.00
m2 99,100.00

10 cm - 100 cm bh
20 cm - 100 cm bh 27,250.00
30 cm - 100 cm bh 42,100.00
40 cm - 100 cm bh 52,000.00
50 cm - 100 cm bh 77,650.00
60 cm - 100 cm bh 115,700.00
100 cm - 100 cm bh 229,700.00
80 cm - 50 cm bh 78,500.00
90 cm - 50 cm bh 86,700.00
100 cm - 50 cm bh 114,800.00
20 cm - 100 cm bh 37,150.00
30 cm - 100 cm bh 47,100.00

bh 6,000.00

besi beton polos kg 10,000.00


besi beton ulir kg 10,000.00

CK Boyolali
J E N I S B A H A N SATUAN HARGA (Rp)

Besi Strip kg 4,100.00


Besi Profil kg 11,500.00
Besi Profil WF kg 14,800.00
kg 11,550.00
kg 15,700.00
kg 26,000.00

kg 23,100.00
bh 18,100.00
bh 750.00
bh 50,000.00
m2 95,000.00

btg 14,800.00
btg 20,600.00
btg 28,900.00
btg 24,700.00
btg 48,700.00
btg 152,800.00
btg 152,800.00
btg 48,700.00
btg 24,700.00
btg 28,900.00
btg 20,600.00
btg 14,800.00

btg 88,800.00
btg 108,600.00
btg 163,200.00
btg 287,400.00
btg 565,200.00
btg 832,800.00

m' 6,600.00
lbr 60,000.00
m1 16,250.00
m2 22,500.00

CK Boyolali
J E N I S B A H A N SATUAN HARGA (Rp)

lbr 80,000.00
lbr 52,800.00

lbr 52,800.00
lbr 62,800.00

lbr 109,000.00
X 12 mm lbr 138,800.00
lbr 75,000.00
m2 17,300.00
(1,2 x 2,4 m2 tb 4 mm) lbr
lbr 52,800.00
lbr 80,000.00

kg 28,900.00
kg 13,200.00
lbr 5,700.00
kg 62,800.00
bh 7,400.00
ltr 42,100.00
ltr 42,100.00

CK Boyolali
J E N I S B A H A N SATUAN HARGA (Rp)

kg 13,200.00
kg 16,000.00

kg 27,250.00
kg 50,000.00
ltr 14,000.00
drum 296,000.00
kg 15,700.00

m2 57,000.00
m2 78,000.00
m2 89,000.00

1 X slag bh 49,500.00
2 X slag bh 131,400.00
2 X slag bh 49,500.00

Sekelas Kuda Terbang bh 49,500.00


Sekelas Anchor bh 156,100.00
Kunci Lemari bh 5,000.00

bh
bh 8,200.00
bh 3,300.00
bh 2,400.00
bh

bh 961,900.00
bh 125,600.00
bh 261,900.00
bh 1,151,200.00
bh 261,900.00

bh 19,800.00
bh 3,300.00
bh 3,300.00
bh 230,500.00
bh 50,000.00

CK Boyolali
J E N I S B A H A N SATUAN HARGA (Rp)

kg 14,000.00
kg 18,100.00
bh 250.00
bh 15,700.00
kg 2,000.00
kg 15,500.00

BH 2,400.00
m2 37,100.00
m2 49,500.00
m2 37,100.00
m2 49,500.00
m2 60,000.00
m2 85,500.00
m2 65,000.00
m2 90,500.00

bh 82,000.00
bh 91,000.00
m2 285,000.00
m2 443,000.00
m' 165,000.00
m' 125,000.00
m1 6,250.00
ltr 14,000.00
m2 545,400.00
kg 27,200.00
m3 72,500.00
ltr 6,400.00
ltr 6,700.00
ltr 15,700.00

Warna Silver 4" tebal 1.2 mm m' 93,000.00


Warna Coklat 4" tebal 1.2 mm m' 110,000.00

Sukoharjo, 2015

Direncana
KASI BINA TEKNIS
BIDANG CIPTA KARYA

CK Boyolali
J E N I S B A H A N SATUAN HARGA (Rp)

Ir. JOKO PRASENO


NIP. 19670209 199803 1 004

Mengetahui
KEPALA DINAS PEKERJAAN UMUM
KABUPATEN SUKOHARJO

Ir. ACHMAD HUFRONI, MT


Pembina Tingkat I
NIP. 19581120 199103 1 004

CK Boyolali
DAFTAR ANALISA PEKERJAAN GEDUNG PROYEK
TAHUN 2015 KABUPATEN SUKOHARJO

No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

I A. 2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN


1 A.2.2.1.2 1 m' Pagar Sementara dari Seng Gelombang Tinggi 2,00 m
A TENAGA
L.01 0.2 OH Pekerja
L.02 0.4 OH Tukang Kayu
L.03 0.02 OH Kepala Tukang
L.04 0.02 OH Mandor
B BAHAN
1.25 Btg Kayu Dolken diameter 8 - 10 / 400 cm
2.5 Kg Portland Semen
1.2 Lbr Seng Gelombang 3" - 5"
0.005 m3 Pasir Beton
0.009 m3 Koral Beton
0.072 m3 Sengon balok
0.06 Kg Paku Biasa 2" - 5"
0.45 Kg Meni Besi
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
Overhead & Profit
2 A.2.2.1.4 1 m' Pengukuran dan Pemasangan Bouwplank
A Tenaga
L.01 0.1 OH Pekerja
L.02 0.1 OH Tukang Kayu
L.03 0.01 OH Kepala Tukang
L.04 0.005 OH Mandor
B Bahan
0.012 m3 Kayu 5/7x 4m Kayu Kruing
0.02 Kg Paku Biasa 2" - 5"
0.007 m3 Sengon balok
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)

3 A.2.2.1.5 1 m2 Pembuatan Kantor Sementara dg Lantai Plesteran


A Tenaga
L.01 2 OH Pekerja
L.02 2 OH Tukang Kayu
L.02 1 OH Tukang Batu
L.03 0.3 OH Kepala Tukang
L.04 0.05 OH Mandor

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

I A. 2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN


B Bahan
1.25 Btg Kayu Dolken Ø 8 - 10 / 4 m
0.18 m3 Sengon balok
0.08 Kg Paku Biasa 2" - 5"
1.1 Kg Besi Strip
35 Kg Portland Sement
0.15 m3 Pasir pasang
0.1 m3 Pasir Beton
0.15 m3 Koral Beton
30 buah Batu bata Merah
0.25 Lbr Seng Plat
0 buah Jendela Naco
0.08 m2 Kaca Polos
0.15 buah Kunci Tanam
0.06 Lbr Plywood 4 mm
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

I A. 2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN


4 A.2.2.1.6 1 m2 Pembuatan Gudang Semen dan Peralatan
A Tenaga
L.01 1 OH Pekerja
L.02 2 OH Tukang Kayu
L.03 0.2 OH Kepala Tukang
L.04 0.05 OH Mandor
B Bahan
1.7 Btg Kayu Dolken diameter 8 - 10 / 400 cm
0.21 m3 Sengon balok
0.3 Kg Paku Biasa 2" - 5"
10.5 Kg Portland Semen
0.03 m3 Pasir Beton
0.05 m3 Koral Beton
1.5 Lbr Seng Gelombang BJLS 32
0.3 Lbr Seng plat
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)

5 A.2.2.1.8 1 m2 Membersihkan Lapangan dan Perataan


A Tenaga
L.01 0.1 OH Pekerja
L.04 0.05 OH Mandor
B Bahan
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)

6 A.2.2.1.10 1 bh Pembuatan Kotak Adukan ukuran 40cmx50cmx25cm


A Tenaga
L.02 0.300 OH Tukang Kayu
L.03 0.030 OH Kepala Tukang
B Bahan
0.036 m3 Kayu Papan Kelas III
m3 Kayu Balok Kelas III
0.080 kg Paku Biasa
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

I A. 2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN

7 A.2.2.1.11 1 m2 Pembuatan Steger/Perancah dari Bambu


A Tenaga
L.01 1.00 OH Pekerja
L.02 2.00 OH Tukang Kayu
L.03 0.200 OH Kepala Tukang
L.04 0.0500 OH Mandor
B Bahan
1.250 Btg Bambu diameter 6 - 8 / 600 cm
0.186 Kg Tali Ijuk
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)

8 A.2.2.1.13 1 m3 Bongkaran Beton Bertulang


A Tenaga
L.02 13.334 OH Pekerja
L.04 0.666 OH Mandor

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

I A. 2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN


B Bahan
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)

9 A.2.2.1.14 1 m3 Bongkaran Dinding Tembok Bata Merah


B Tenaga
L.02 6.667 OH Pekerja
L.04 0.033 OH Mandor
B Bahan
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)

10 A.2.2.1.17 10 m2 Bongkaran tegel


B Tenaga
L.02 1.000 OH Pekerja
L.04 0.100 OH Mandor
B Bahan
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)

11 A.2.2.1.18 10 m2 Menurunkan usuk dan reng dari kayu


A Tenaga
L.01 1.000 OH Pekerja
L.02 0.250 OH Tukang Kayu
L.03 0.025 OH Kepala Tukang
L.04 0.050 OH Mandor
B Bahan
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)

12 A.2.2.1.19 10 m2 Membongkar pyan


A Tenaga

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

I A. 2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN


L.01 2.00 Oh Pekerja
L.02 0.60 Oh Tukang Kayu
L.03 0.060 Oh Kepala Tukang
L.04 0.1000 Oh Mandor
B Bahan
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)

13 A.2.2.1.20 10 m2 Menurunkan genteng


B Tenaga
L.02 0.200 OH Pekerja
L.04 0.100 OH Mandor
B Bahan
C PERALATAN
D Jumlah A + B + C
E Harga Satuan Pekerjaan (D+E) 10%
F Harga Satuan Pekerjaan (D+E)

CK Boyolali
ALISA PEKERJAAN GEDUNG PROYEK
UN 2015 KABUPATEN SUKOHARJO

HARGA JUMLAH
BAHAN/UPAH
Rp Rp

330,468.88
35,621.00
41,400.00 8,280.00
61,950.00 24,780.00
66,100.00 1,322.00
61,950.00 1,239.00
264,805.25
18,000.00 22,500.00
1,337.50 3,343.75
47,900.00 57,480.00
185,000.00 925.00
206,000.00 1,854.00
2,300,000.00 165,600.00
14,000.00 840.00
27,250.00 12,262.50

300,426.25
30,042.63
330,468.88

104,374.33
11,305.75
41,400.00 4,140.00
61,950.00 6,195.00
66,100.00 661.00
61,950.00 309.75
83,580.00
5,600,000.00 67,200.00
14,000.00 280.00
2,300,000.00 16,100.00

94,885.75
9,488.58
104,374.33

1,001,657.80
287,477.50
41,400.00 82,800.00
61,950.00 123,900.00
57,850.00 57,850.00
66,100.00 19,830.00
61,950.00 3,097.50

CK Boyolali
HARGA JUMLAH
BAHAN/UPAH
Rp Rp

623,120.50
18,000.00 22,500.00
2,300,000.00 414,000.00
14,000.00 1,120.00
4,100.00 4,510.00
1,337.50 46,812.50
185,000.00 27,750.00
185,000.00 18,500.00
206,000.00 30,900.00
650.00 19,500.00
23,900.00 5,975.00
82,000.00 16,400.00
57,000.00 4,560.00
49,500.00 7,425.00
52,800.00 3,168.00

910,598.00
91,059.80
1,001,657.80

CK Boyolali
HARGA JUMLAH
BAHAN/UPAH
Rp Rp

887,849.88
181,617.50
41,400.00 41,400.00
61,950.00 123,900.00
66,100.00 13,220.00
61,950.00 3,097.50
625,518.75
18,000.00 30,600.00
2,300,000.00 483,000.00
14,000.00 4,200.00
1,337.50 14,043.75
185,000.00 5,550.00
206,000.00 10,300.00
47,900.00 71,850.00
23,900.00 5,975.00

807,136.25
80,713.63
887,849.88

7,961.25
7,237.50
41,400.00 4,140.00
61,950.00 3,097.50

7,237.50
723.75
7,961.25

253,536.80
20,568.00
61,950.00 18,585.00
66,100.00 1,983.00
209,920.00
5,800,000.00 208,800.00
5,600,000.00 -
14,000.00 1,120.00

230,488.00
23,048.80
253,536.80

CK Boyolali
HARGA JUMLAH
BAHAN/UPAH
Rp Rp

218,338.45
181,617.50
41,400.00 41,400.00
61,950.00 123,900.00
66,100.00 13,220.00
61,950.00 3,097.50
16,872.00
13,200.00 16,500.00
2,000.00 372.00

198,489.50
19,848.95
218,338.45

652,614.93
593,286.30
41,400.00 552,027.60
61,950.00 41,258.70

CK Boyolali
HARGA JUMLAH
BAHAN/UPAH
Rp Rp

593,286.30
59,328.63
652,614.93

305,863.97
278,058.15
41,400.00 276,013.80
61,950.00 2,044.35

278,058.15
27,805.82
305,863.97

52,354.50
47,595.00
41,400.00 41,400.00
61,950.00 6,195.00

47,595.00
4,759.50
52,354.50
Untuk 1 m2 5,235.45

67,801.25
61,637.50
41,400.00 41,400.00
61,950.00 15,487.50
66,100.00 1,652.50
61,950.00 3,097.50

61,637.50
6,163.75
67,801.25
Untuk 1 m2 6,780.12

143,144.10
130,131.00

CK Boyolali
HARGA JUMLAH
BAHAN/UPAH
Rp Rp

41,400.00 82,800.00
61,950.00 37,170.00
66,100.00 3,966.00
61,950.00 6,195.00

130,131.00
13,013.10
143,144.10
Untuk 1 m2 14,314.41

15,922.50
14,475.00
41,400.00 8,280.00
61,950.00 6,195.00

14,475.00
1,447.50
15,922.50
Untuk 1 m2 1,592.25

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

II A.2.3.1 HARGA SATUAN PEKERJAAN TANAH


1 A.2.3.1.1 1 m3 Menggali Tanah Biasa Sedalam 1 m
A TENAGA
L.01 0.75 OH Pekerja
L.04 0.025 OH Mandor
B BAHAN
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
Overhead & Profit
2 A.2.3.1.2 1 m3 Menggali Tanah Biasa Sedalam 2 m
A TENAGA
L.01 0.90 OH Pekerja
L.04 0.045 OH Mandor
B BAHAN
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

3 A.2.3.1.3 1 m3 Menggali Tanah Biasa Sedalam 3 m


A TENAGA
L.01 1.05 OH Pekerja
L.04 0.067 OH Mandor
B BAHAN
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

4 A.2.3.1.4 1 m3 Menggali Tanah Keras Sedalam 1 m


TENAGA
L.01 1.000 OH Pekerja
L.04 0.032 OH Mandor
B BAHAN
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

5 A.2.3.1.5 1 m3 Menggali Tanah Cadas Sedalam 1 m


A TENAGA
L.01 1.50 OH Pekerja
L.04 0.060 OH Mandor
B BAHAN
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

6 A.2.3.1.6 1 m3 Menggali Tanah Lumpur Sedalam 1 m

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

II A.2.3.1 HARGA SATUAN PEKERJAAN TANAH


A TENAGA
L.01 1.200 OH Pekerja
L.04 0.045 OH Mandor
B BAHAN
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

7 A.2.3.1.7 1 m2 Mengerjakan Striping Tebing Setinggi 1 m


A TENAGA
L.01 0.05 OH Pekerja
L.04 0.005 OH Mandor
B BAHAN
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

8 A.2.3.1.8 1 m3 Membuang Tanah sejauh 30 m'


A TENAGA
L.01 0.330 OH Pekerja
L.04 0.010 OH Mandor
B BAHAN
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

II A.2.3.1 HARGA SATUAN PEKERJAAN TANAH


9 A.2.3.1.9 1 m3 Pengurugan Kembali
Pengurugan Kembali di hitung dari 1/3 kali koefisien Pe
A TENAGA
L.01 0.3 OH Pekerja
L.04 0.01 OH Mandor
B BAHAN
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

10 A.2.3.1.10 1 m3 Pemadatan Tanah (per 20 cm)


A TENAGA
L.01 0.5 OH Pekerja
L.04 0.05 OH Mandor
B BAHAN
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

11 A.2.3.1.11 1 m3 Urugan Pasir


A TENAGA
L.01 0.30 OH Pekerja
L.04 0.01 OH Mandor
B BAHAN
1.2 m3 Pasir Urug
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

12 A.2.3.1.14 1 m2 Pemasangan Lapisan Ijuk tebal 10 cm unt Bidang Resapa


A TENAGA
L.01 0.15 OH Pekerja
L.04 0.015 OH Mandor
B BAHAN
6.00 kg Ijuk
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

13 A.2.3.1.15 1 m3 Mengurug Sirtu Padat


A TENAGA
L.01 0.25 OH Pekerja
L.04 0.025 OH Mandor
B BAHAN
1.2 m3 Sirtu
C PERALATAN
D Jumlah A + B + C

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

II A.2.3.1 HARGA SATUAN PEKERJAAN TANAH


E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

14 A.2.3.1.16 1 m3 Urugan tanah padas


OH Pekerja
L.01 0.25 OH Pekerja
L.04 0.01 OH Mandor
m3 Sirtu
1.300 m3 Tanah padas
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

CK Boyolali
HARGA JUMLAH
URAIAN PEKERJAAN BAHAN/UPAH
Rp Rp

35,858.63
32,598.75
41,400.00 31,050.00
61,950.00 1,548.75

32,598.75
10% 3,259.88
35,858.63

44,052.53
40,047.75
41,400.00 37,260.00
61,950.00 2,787.75

40,047.75
10% 4,004.78
44,052.53

52,382.72
47,620.65
41,400.00 43,470.00
61,950.00 4,150.65

47,620.65
10% 4,762.07
52,382.72

47,720.64
43,382.40
41,400.00 41,400.00
61,950.00 1,982.40

43,382.40
10% 4,338.24
47,720.64

72,398.70
65,817.00
41,400.00 62,100.00
61,950.00 3,717.00

65,817.00
10% 6,581.70
72,398.70

57,714.53

CK Boyolali
HARGA JUMLAH
URAIAN PEKERJAAN BAHAN/UPAH
Rp Rp

52,467.75
41,400.00 49,680.00
61,950.00 2,787.75

52,467.75
10% 5,246.78
57,714.53

2,617.73
2,379.75
41,400.00 2,070.00
61,950.00 309.75

2,379.75
10% 237.98
2,617.73

15,709.65
14,281.50
41,400.00 13,662.00
61,950.00 619.50

14,281.50
10% 1,428.15
15,709.65

CK Boyolali
HARGA JUMLAH
URAIAN PEKERJAAN BAHAN/UPAH
Rp Rp

11,952.88
rugan Kembali di hitung dari 1/3 kali koefisien Pekerjaan galian
10,866.25
41,400.00 10,350.00
61,950.00 516.25

10,866.25
10% 1,086.63
11,952.88

26,177.25
23,797.50
41,400.00 20,700.00
61,950.00 3,097.50

23,797.50
10% 2,379.75
26,177.25

152,943.45
13,039.50
41,400.00 12,420.00
61,950.00 619.50
126,000.00
105,000.00 126,000.00

139,039.50
10% 13,903.95
152,943.45

sangan Lapisan Ijuk tebal 10 cm unt Bidang Resapan 21,053.18


7,139.25
41,400.00 6,210.00
61,950.00 929.25
12,000.00
2,000.00 12,000.00

19,139.25
10% 1,913.93
21,053.18

163,568.63
11,898.75
41,400.00 10,350.00
61,950.00 1,548.75
136,800.00
114,000.00 136,800.00

148,698.75

CK Boyolali
HARGA JUMLAH
URAIAN PEKERJAAN BAHAN/UPAH
Rp Rp

10% 14,869.88
163,568.63

72,841.45
10,969.50
41,400.00 10,350.00
61,950.00 619.50
55,250.00
42,500.00 55,250.00

66,219.50
10% 6,621.95
72,841.45

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAA

III A.3.2.1. HARGA SATUAN PEKERJAAN PONDASI


1 A.3.2.1.1 1 m3 Pemasangan Pondasi Batu Belah 1SP : 3 P
A TENAGA
L.01 1.5 OH Pekerja
L.02 0.750 OH Tukang Batu
L.03 0.075 OH Kepala Tukang
L.04 0.075 OH Mandor
B BAHAN
1.2 m3 Batu Belah 15/20
202 Kg Portland Cement
0.485 m3 Pasir Pasang
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
Overhead & Profit
2 A.3.2.1.2 1 m3 Pemasangan Pondasi Batu Belah 1SP : 4 P
A TENAGA
L.01 1.5 OH Pekerja
L.02 0.750 OH Tukang Batu
L.03 0.075 OH Kepala Tukang
L.04 0.075 OH Mandor
B BAHAN
1.2 m3 Batu Belah 15/20
163 Kg Portland Cement
0.52 m3 Pasir Pasang
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

3 A.3.2.1.3 1 m3 Pemasangan Pondasi Batu Belah 1SP : 5 P


A TENAGA
L.01 1.5 OH Pekerja
L.02 0.750 OH Tukang Batu
L.03 0.075 OH Kepala Tukang
L.04 0.075 OH Mandor
B BAHAN
1.2 m3 Batu Belah 15/20
136 Kg Portland Cement
0.544 m3 Pasir Pasang
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

4 A.3.2.1.4 1 m3 Pemasangan Pondasi Batu Belah 1SP : 6 P


A TENAGA
L.01 1.5 OH Pekerja
L.02 0.750 OH Tukang Batu
L.03 0.075 OH Kepala Tukang
L.04 0.075 OH Mandor

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAA

III A.3.2.1. HARGA SATUAN PEKERJAAN PONDASI


B BAHAN
1.2 m3 Batu Belah 15/20
117 Kg Portland Cement
0.561 m3 Pasir Pasang
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

5 A.3.2.1.5 1 m3 Pemasangan Pondasi Batu Belah 1SP : 8 P


A Tenaga
L.01 1.5 OH Pekerja
L.02 0.750 OH Tukang Batu
L.03 0.075 OH Kepala Tukang
L.04 0.075 OH Mandor
B Bahan
1.2 m3 Batu Belah 15/20
91 Kg Portland Cement
0.584 m3 Pasir Pasang
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

6 A.3.2.1.7 1 m3 Pemasangan Pondasi Batu Belah, 1 SP : 3


A Tenaga
L.01 1.5 OH Pekerja
L.02 0.750 OH Tukang Batu
L.03 0.075 OH Kepala Tukang
L.04 0.075 OH Mandor
B Bahan
1.2 m3 Batu Belah 15/20
61 kg Portland Cement
0.147 m3 Kapur Pasang
0.492 m3 Pasir Pasang

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAA

III A.3.2.1. HARGA SATUAN PEKERJAAN PONDASI


C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

7 A.3.2.1.8 1 m3 Pemasangan Pondasi Batu Belah, ¼ SP : 1


A Tenaga
L.01 1.5 OH Pekerja
L.02 0.750 OH Tukang Batu
L.03 0.075 OH Kepala Tukang
L.04 0.075 OH Mandor
B Bahan
1.2 m3 Batu Belah 15/20
41 kg Portland Cement
0.131 m3 Kapur Pasang
0.523 m3 Pasir
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

8 A.3.2.1.9 1 m3 Pemasang Batu Kosong/Anstamping


A Tenaga
L.01 0.78 OH Pekerja
L.02 0.39 OH Tukang Batu
L.03 0.039 OH Kepala Tukang
L.04 0.039 OH Mandor
B Bahan
1.2 m3 Batu Belah 15/20
0.432 m3 Pasir Urug
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

9 A.3.2.1.10 1 m3 Pasang Pondasi Siklop, 60% Beton Camp


A Tenaga
L.01 3.4 OH Pekerja
L.02 0.85 OH Tukang Batu
L.03 0.085 OH Kepala Tukang
L.04 0.17 OH Mandor
B Bahan
0.480 m3 Batu Belah 15/20 cm
126 Kg Besi Beton
194 Kg Portland Cement
0.312 m3 Pasir Beton
0.468 m3 Koral Beton
1.8 Kg Kawat Beton
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAA

III A.3.2.1. HARGA SATUAN PEKERJAAN PONDASI


F Harga Satuan Pekerjaan (D+E)

10 A.3.2.1.11 1 m3 Pasang Pondasi Sumuran diameter 100 c


A Tenaga
L.01 2.40 OH Pekerja
L.02 0.8 OH Tukang Batu
L.03 0.08 OH Kepala Tukang
L.04 0.119 OH Mandor
B Bahan
0.45 m3 Batu Belah 15/20 cm
194 Kg Portland Cement
0.312 m3 Pasir Beton
0.468 m3 Koral Beton
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

CK Boyolali
HARGA JUMLAH
URAIAN PEKERJAAN BAHAN/UPAH
Rp Rp
HARGA SATUAN PEKERJAAN PONDASI
Pemasangan Pondasi Batu Belah 1SP : 3 PP 773,290.38
115,091.25
41,400.00 62,100.00
57,850.00 43,387.50
66,100.00 4,957.50
61,950.00 4,646.25
587,900.00
190,000.00 228,000.00
1,337.50 270,175.00
185,000.00 89,725.00

702,991.25
10% 70,299.13
Harga Satuan Pekerjaan (D+E) 773,290.38

Pemasangan Pondasi Batu Belah 1SP : 4 PP 723,034.13


115,091.25
41,400.00 62,100.00
57,850.00 43,387.50
66,100.00 4,957.50
61,950.00 4,646.25
542,212.50
190,000.00 228,000.00
1,337.50 218,012.50
185,000.00 96,200.00

657,303.75
10% 65,730.38
Harga Satuan Pekerjaan (D+E) 723,034.13

Pemasangan Pondasi Batu Belah 1SP : 5 PP 688,194.38


115,091.25
41,400.00 62,100.00
57,850.00 43,387.50
66,100.00 4,957.50
61,950.00 4,646.25
510,540.00
190,000.00 228,000.00
1,337.50 181,900.00
185,000.00 100,640.00

625,631.25
10% 62,563.13
Harga Satuan Pekerjaan (D+E) 688,194.38

Pemasangan Pondasi Batu Belah 1SP : 6 PP 663,700.13


115,091.25
41,400.00 62,100.00
57,850.00 43,387.50
66,100.00 4,957.50
61,950.00 4,646.25

CK Boyolali
HARGA JUMLAH
URAIAN PEKERJAAN BAHAN/UPAH
Rp Rp
HARGA SATUAN PEKERJAAN PONDASI
488,272.50
190,000.00 228,000.00
1,337.50 156,487.50
185,000.00 103,785.00

603,363.75
10% 60,336.38
Harga Satuan Pekerjaan (D+E) 663,700.13

Pemasangan Pondasi Batu Belah 1SP : 8 PP 630,128.13


115,091.25
41,400.00 62,100.00
57,850.00 43,387.50
66,100.00 4,957.50
61,950.00 4,646.25
457,752.50
190,000.00 228,000.00
1,337.50 121,712.50
185,000.00 108,040.00

572,843.75
10% 57,284.38
Harga Satuan Pekerjaan (D+E) 630,128.13

Pemasangan Pondasi Batu Belah, 1 SP : 3 KP : 10 PP 599,285.23


115,091.25
41,400.00 62,100.00
57,850.00 43,387.50
66,100.00 4,957.50
61,950.00 4,646.25
429,713.50
190,000.00 228,000.00
1,337.50 81,587.50
198,000.00 29,106.00
185,000.00 91,020.00

CK Boyolali
HARGA JUMLAH
URAIAN PEKERJAAN BAHAN/UPAH
Rp Rp
HARGA SATUAN PEKERJAAN PONDASI

544,804.75
10% 54,480.48
Harga Satuan Pekerjaan (D+E) 599,285.23

Pemasangan Pondasi Batu Belah, ¼ SP : 1KP : 4 PP 572,683.93


115,091.25
41,400.00 62,100.00
57,850.00 43,387.50
66,100.00 4,957.50
61,950.00 4,646.25
405,530.50
190,000.00 228,000.00
1,337.50 54,837.50
198,000.00 25,938.00
185,000.00 96,755.00

520,621.75
10% 52,062.18
Harga Satuan Pekerjaan (D+E) 572,683.93

Pemasang Batu Kosong/Anstamping 366,528.20


59,847.45
41,400.00 32,292.00
57,850.00 22,561.50
66,100.00 2,577.90
61,950.00 2,416.05
273,360.00
190,000.00 228,000.00
105,000.00 45,360.00

333,207.45
10% 33,320.75
Harga Satuan Pekerjaan (D+E) 366,528.20

Pasang Pondasi Siklop, 60% Beton Camp. 1PC : 2PB : 3KR & 40% Batu Belah 2,199,060.05
206,082.50
41,400.00 140,760.00
57,850.00 49,172.50
66,100.00 5,618.50
61,950.00 10,531.50
1,793,063.00
190,000.00 91,200.00
10,000.00 1,260,000.00
1,337.50 259,475.00
185,000.00 57,720.00
206,000.00 96,408.00
15,700.00 28,260.00

1,999,145.50
10% 199,914.55

CK Boyolali
HARGA JUMLAH
URAIAN PEKERJAAN BAHAN/UPAH
Rp Rp
HARGA SATUAN PEKERJAAN PONDASI
Harga Satuan Pekerjaan (D+E) 2,199,060.05

Pasang Pondasi Sumuran diameter 100 cm 723,143.36


158,300.05
41,400.00 99,360.00
57,850.00 46,280.00
66,100.00 5,288.00
61,950.00 7,372.05
499,103.00
190,000.00 85,500.00
1,337.50 259,475.00
185,000.00 57,720.00
206,000.00 96,408.00

657,403.05
10% 65,740.31
Harga Satuan Pekerjaan (D+E) 723,143.36

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

IV A.4.1.1 HARGA SATUAN PEKERJAAN B E T O N


1 A.4.1.1.1 1 m3 Membuat Beton mutu f'c=7,4 Mpa (K100), slum (12±2)cm
A Tenaga
L.01 1.65 OH Pekerja
L.02 0.275 OH Tukang Batu
L.03 0.028 OH Kepala Tukang
L.04 0.083 OH Mandor
B Bahan
247 Kg Portland Semen
869 Kg Pasir Beton
999 Kg Kerikil (maksimum 30 mm)
215 ltr Air
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
Overhead & Profit
2 A.4.1.1.2 1 m3 Membuat Beton mutu f'c=9,8 Mpa (K125), slum (12±2)cm
A Tenaga
L.01 1.650 OH Pekerja
L.02 0.275 OH Tukang Batu
L.03 0.028 OH Kepala Tukang
L.04 0.083 OH Mandor
B Bahan
276.000 Kg Portland Semen
828.000 kg Pasir Beton
1012.000 kg Kerikil (maksimum 30 mm)
215.000 ltr Air
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

3 A.4.1.1.3 1.00 m3 Membuat Beton mutu f'c=12,2 Mpa (K150), slum (12±2)cm
A Tenaga
L.01 1.650 OH Pekerja
L.02 0.275 OH Tukang Batu
L.03 0.028 OH Kepala Tukang
L.04 0.083 OH Mandor
B Bahan
299.000 Kg Portland Semen
799.000 kg Pasir Beton
1017.000 kg Kerikil (maksimum 30 mm)
215.000 ltr Air
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

IV A.4.1.1 HARGA SATUAN PEKERJAAN B E T O N


F Harga Satuan Pekerjaan (D+E)

4 A.4.1.1.4 1.00 m3 Membuat Lantai Kerja Beton mutu f'c=7,4 MPa (K100), slu
A Tenaga
L.01 1.200 OH Pekerja
L.02 0.200 OH Tukang Batu
L.03 0.020 OH Kepala Tukang
L.04 0.060 OH Mandor
B Bahan
230.000 Kg Portland Semen
893.000 kg Pasir Beton
1027.000 kg Kerikil (maksimum 30 mm)
200.000 ltr Air
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

5 A.4.1.1.5 1 m3 Membuat Beton mutu f'c=14,5 MPa (K175), slum (12±2)cm


A Tenaga
L.01 1.65 OH Pekerja
L.02 0.275 OH Tukang Batu
L.03 0.028 OH Kepala Tukang
L.04 0.083 OH Mandor
B Bahan
326 Kg Portland Semen
760 Kg Pasir Beton
1,029 Kg Kerikil (maksimum 30 mm)
215 ltr Air

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

IV A.4.1.1 HARGA SATUAN PEKERJAAN B E T O N


C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

6 A.4.1.1.6 1 m3 Membuat Beton mutu f'c=16,9 MPa (K200), slum (12±2)cm


A Tenaga
L.01 1.650 OH Pekerja
L.02 0.275 OH Tukang Batu
L.03 0.028 OH Kepala Tukang
L.04 0.083 OH Mandor
B Bahan
352 Kg Portland Semen
731 Kg Pasir Beton
1,031 Kg Kerikil (maksimum 30 mm)
215 ltr Air
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

7 A.4.1.1.7 1 m3 Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm


A Tenaga
L.01 1.650 OH Pekerja
L.02 0.275 OH Tukang Batu
L.03 0.028 OH Kepala Tukang
L.04 0.083 OH Mandor
B Bahan
371 Kg Portland Semen
698 Kg Pasir Beton
1,047 Kg Kerikil (maksimum 30 mm)
215 ltr Air
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

8 A.4.1.1.8 1 m3 Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm


A Tenaga
L.01 1.650 OH Pekerja
L.02 0.275 OH Tukang Batu
L.03 0.028 OH Kepala Tukang
L.04 0.083 OH Mandor
B Bahan
384 Kg Portland Semen
692 Kg Pasir Beton

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

IV A.4.1.1 HARGA SATUAN PEKERJAAN B E T O N


1,039 Kg Kerikil (maksimum 30 mm)
215 ltr Air
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

9 A.4.1.1.9 1 m3 Membuat Lantai Kerja Beton mutu f'c=24,0 MPa (K275), s


A Tenaga
L.01 1.650 OH Pekerja
L.02 0.275 OH Tukang Batu
L.03 0.028 OH Kepala Tukang
L.04 0.083 OH Mandor
B Bahan
406 Kg Portland Semen
684 kg Pasir Beton
1,026 kg Kerikil (maksimum 30 mm)
215 ltr Air
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

10 A.4.1.1.10 1 m3 Membuat Beton mutu f'c=26,4 MPa (K300), slum (12±2)cm


A Tenaga
L.01 1.650 OH Pekerja
L.02 0.275 OH Tukang Batu
L.03 0.028 OH Kepala Tukang
L.04 0.083 OH Mandor

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

IV A.4.1.1 HARGA SATUAN PEKERJAAN B E T O N


B Bahan
413 Kg Portland Semen
681 Kg Pasir Beton
1,021 Kg Kerikil (maksimum 30 mm)
215 ltr Air
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

11 A.4.1.1.11 1 m3 Membuat Beton mutu f'c=28,8 MPa (K325), slum (12±2)cm


A Tenaga
L.01 2.1 OH Pekerja
L.02 0.35 OH Tukang Batu
L.03 0.035 OH Kepala Tukang
L.04 0.105 OH Mandor
B Bahan
439 Kg Portland Semen
670 Kg Pasir Beton
1,006 Kg Kerikil (maksimum 30 mm)
215 ltr Air
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

12 A.4.1.1.12 1 m3 Membuat Beton mutu f'c=31,2 MPa (K350), slum (12±2)cm


A Tenaga
L.01 2.10 OH Pekerja
L.02 0.350 OH Tukang Batu
L.03 0.035 OH Kepala Tukang
L.04 0.105 OH Mandor
B Bahan
448 Kg Portland Semen
667 Kg Pasir Beton
1,000 Kg Kerikil (maksimum 30 mm)
215 ltr Air
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

13 A.4.1.1.17 10 Kg Pembesian dg Besi Polos atau Besi Ulir


A Tenaga
L.01 0.07 OH Pekerja
L.02 0.07 OH Tukang Besi

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

IV A.4.1.1 HARGA SATUAN PEKERJAAN B E T O N


L.03 0.007 OH Kepala Tukang
L.04 0.004 OH Mandor
B Bahan
10.50 Kg Besi Beton (polos/ulir)
0.150 Kg Kawat Beton
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

14 A.4.1.1.20 1 m2 Memasang Bekisting untuk Pondasi


A Tenaga
L.01 0.52 OH Pekerja
L.02 0.26 OH Tukang Kayu
L.03 0.026 OH Kepala Tukang
L.04 0.026 OH Mandor
B Bahan
0.04 m3 Kayu Klas III (Terentang)
0.3 Kg Paku Biasa 2" - 5"
0.1 Ltr Minyak Bekisting
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

15 A.4.1.1.21 1 m2 Memasang Bekisting untuk Sloof


A Tenaga
L.01 0.52 OH Pekerja
L.02 0.26 OH Tukang Kayu
L.03 0.026 OH Kepala Tukang
L.04 0.026 OH Mandor

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

IV A.4.1.1 HARGA SATUAN PEKERJAAN B E T O N


B Bahan
0.045 m3 Kayu Klas III (Terentang)
0.3 Kg Paku Biasa 2" - 5"
0.1 Ltr Minyak Bekisting
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

16 A.4.1.1.22 1 m2 Memasang Bekisting untuk Kolom


A Tenaga
L.01 0.66 OH Pekerja
L.02 0.33 OH Tukang Kayu
L.03 0.033 OH Kepala Tukang
L.04 0.033 OH Mandor
B Bahan
0.04 m3 Kayu Klas III (Terentang)
0.4 Kg Paku Biasa 2" - 5"
0.2 Ltr Minyak Bekisting
0.015 m3 Balok Sengon
0.35 Lbr Multiplek tebal 9mm
2 Btg Dolken Kayu Galam diameter 8 - 10 cm / 4 m
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

17 A.4.1.1.23 1 m2 Memasang Bekisting untuk Balok


A Tenaga
L.01 0.66 OH Pekerja
L.02 0.33 OH Tukang Kayu
L.03 0.033 OH Kepala Tukang
L.04 0.033 OH Mandor
B Bahan
0.04 m3 Kayu Klas III (Terentang)
0.4 Kg Paku Biasa 2" - 5"
0.2 Ltr Minyak Bekisting
0.018 m3 Balok Sengon
0.35 Lbr Multiplek tebal 9mm
2 Btg Dolken Kayu Galam diameter 8 - 10 cm / 4 m
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

18 A.4.1.1.24 1 m2 Memasang Bekisting untuk Lantai

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

IV A.4.1.1 HARGA SATUAN PEKERJAAN B E T O N


A Tenaga
L.01 0.66 OH Pekerja
L.02 0.33 OH Tukang Kayu
L.03 0.033 OH Kepala Tukang
L.04 0.033 OH Mandor
B Bahan
0.04 m3 Kayu Klas III (Terentang)
0.4 Kg Paku Biasa 2" - 5"
0.2 Ltr Minyak Bekisting
0.015 m3 Balok Sengon
0.35 Lbr Multiplek tebal 9mm
6 Btg Dolken Kayu Galam diameter 8 - 10 cm / 4 m
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

19 A.4.1.1.25 1 m2 Memasang Bekisting untuk Dinding


A Tenaga
L.01 0.66 OH Pekerja
L.02 0.33 OH Tukang Kayu
L.03 0.033 OH Kepala Tukang
L.04 0.033 OH Mandor
B Bahan
0.03 m3 Kayu Klas III (Terentang)
0.4 Kg Paku Biasa 2" - 5"
0.2 Ltr Minyak Bekisting
0.02 m3 Balok Sengon
0.35 Lbr Multiplek tebal 9mm
3 Btg Dolken Kayu Galam diameter 8 - 10 cm / 4 m
4 Buah Formite/Penjaga jarak / Spacer (alat bantu)

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

IV A.4.1.1 HARGA SATUAN PEKERJAAN B E T O N


C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

20 A.4.1.1.26 1 m2 Memasang Bekisting untuk Tangga


A Tenaga
L.01 0.66 OH Pekerja
L.02 0.33 OH Tukang Kayu
L.03 0.033 OH Kepala Tukang
L.04 0.033 OH Mandor
B Bahan
0.03 m3 Kayu Klas III (Terentang)
0.4 Kg Paku Biasa 2" - 5"
0.15 Ltr Minyak Bekisting
0.015 m3 Balok Sengon
0.35 Lbr Multiplek tebal 9mm
2 Btg Dolken Kayu Galam diameter 8 - 10 cm / 4 m
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

21 A.4.1.1.27 1 m2 Memasang Jembatan Cor


A Tenaga
L.01 0.15 OH Pekerja
L.02 0.05 OH Tukang Kayu
L.03 0.005 OH Kepala Tukang
L.04 0.008 OH Mandor
B Bahan
0.0264 m3 Kayu Terentang
0.6 kg Paku Biasa 2" - 5"
0.5 m3 Dolken Kayu Galam diameter 8 - 10 / 4 m
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

22 A.4.1.1.28 1 m3 Membuat Pondasi Beton Bertulang (150 kg Besi + Bekisting


A Tenaga
L.01 5.3 OH Pekerja
L.02 0.275 OH Tukang batu
L.02 1.30 OH Tukang Kayu
L.02 1.05 OH Tukang Besi
L.03 0.262 OH Kepala Tukang
L.04 0.265 OH Mandor

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

IV A.4.1.1 HARGA SATUAN PEKERJAAN B E T O N


B Bahan
0.2 m3 Kayu Klas III (Terentang)
1.5 Kg Paku Biasa 2" - 5"
0.4 Ltr Minyak Bekisting
157.5 Kg Besi Beton Polos
2.25 Kg Kawat Beton
336 Kg Portland Semen
0.54 m3 Pasir Beton
0.81 m3 Kerikil Beton
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

23 A.4.1.1.29 1 m3 Membuat Sloof Beton Bertulang (200 kg Besi + Bekisting)


A Tenaga
L.01 5.65 OH Pekerja
L.02 0.275 OH Tukang batu
L.02 1.56 OH Tukang Kayu
L.02 1.4 OH Tukang Besi
L.03 0.323 OH Kepala Tukang
L.04 0.283 OH Mandor
B Bahan
0.27 m3 Kayu Klas III (Terentang)
2 Kg Paku Biasa 2" - 5"
0.6 Ltr Minyak Bekisting
210 Kg Besi Beton Polos
3 Kg Kawat Beton
336 Kg Portland Semen
0.54 m3 Pasir Beton
0.81 m3 Kerikil Beton

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

IV A.4.1.1 HARGA SATUAN PEKERJAAN B E T O N


C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

24 A.4.1.1.30 1 m3 Membuat Kolom Beton Bertulang (300 kg Besi + Bekisting)


A Tenaga
L.01 7.05 OH Pekerja
L.02 0.275 OH Tukang batu
L.02 1.65 OH Tukang Kayu
L.02 2.1 OH Tukang Besi
L.03 0.403 OH Kepala Tukang
L.04 0.353 OH Mandor
B Bahan
0.4 m3 Kayu Klas III (Terentang)
4 Kg Paku Biasa 2" - 5"
2 Ltr Minyak Bekisting
315 kg Besi Beton Polos
4.5 kg Kawat Beton
336 Kg Portland Semen
0.54 m3 Pasir Beton
0.81 m3 Kerikil Beton
0.15 m3 Balok Sengon
3.5 Lbr Plywood 9 mm
20 Btg Dolken diameter 8 / 4rm
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

25 A.4.1.1.31 1 m3 Membuat Balok Beton Bertulang (200 kg Besi + Bekisting)


A Tenaga
L.01 6.35 OH Pekerja
L.02 0.275 OH Tukang batu
L.02 1.65 OH Tukang Kayu
L.02 1.4 OH Tukang Besi
L.03 0.333 OH Kepala Tukang
L.04 0.318 OH Mandor
B Bahan
0.32 m3 Kayu Klas III (Terentang)
3.2 Kg Paku Biasa 2" - 5"
1.6 Ltr Minyak Bekisting
210 Kg Besi Beton Polos
3 Kg Kawat Beton
336 Kg Portland Semen
0.54 m3 Pasir Beton

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

IV A.4.1.1 HARGA SATUAN PEKERJAAN B E T O N


0.81 m3 Kerikil Beton
0.14 m3 Balok Sengon
2.8 Lbr Plywood 9 mm
16 Btg Dolken diameter 8 / 4rm
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

26 A.4.1.1.32 1 m3 Membuat plat beton bertulang (150 kg besi + bekisting)


A Tenaga
L.01 5.3 OH Pekerja
L.02 0.275 OH Tukang batu
L.02 1.3 OH Tukang Kayu
L.02 1.05 OH Tukang Besi
L.03 0.265 OH Kepala Tukang
L.04 0.265 OH Mandor
B Bahan
0.32 m3 Kayu Klas III (Terentang)
3.2 Kg Paku Biasa 2" - 5"
1.6 Ltr Minyak Bekisting
157.5 Kg Besi Beton Polos
2.25 Kg Kawat Beton
336 Kg Portland Semen
0.54 m3 Pasir Beton
0.81 m3 Kerikil Beton
0.12 m3 Balok Sengon
2.8 Lbr Plywood 9 mm
32 Btg Dolken diameter 8 / 4rm
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

IV A.4.1.1 HARGA SATUAN PEKERJAAN B E T O N


27 A.4.1.1.33 1 m3 Membuat Dinding Beton Bertulang (150 kg Besi + Bekisting
A Tenaga
L.01 5.3 OH Pekerja
L.02 0.275 OH Tukang batu
L.02 1.3 OH Tukang Kayu
L.02 1.05 OH Tukang Besi
L.03 0.262 OH Kepala Tukang
L.04 0.265 OH Mandor
B Bahan
0.24 m3 Kayu Klas III (Terentang)
3.2 Kg Paku Biasa 2" - 5"
1.6 Ltr Minyak Bekisting
157.5 Kg Besi Beton Polos
2.25 Kg Kawat Beton
336 Kg Portland Semen
0.54 m3 Pasir Beton
0.81 m3 Kerikil Beton
0.16 m3 Balok Sengon
2.8 Lbr Plywood 9 mm
24 Btg Dolken diameter 8 / 4rm
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

28 A.4.1.1.34 1 m3 Membuat Dinding Beton Bertulang (200 kg Besi + Bekisting


A Tenaga
L.01 5.65 OH Pekerja
L.02 0.275 OH Tukang batu
L.02 1.56 OH Tukang Kayu
L.02 1.4 OH Tukang Besi
L.03 0.323 OH Kepala Tukang
L.04 0.283 OH Mandor
B Bahan
0.25 m3 Kayu Klas III (Terentang)
3 Kg Paku Biasa 2" - 5"
1.2 Ltr Minyak Bekisting
210 Kg Besi Beton Polos
3 Kg Kawat Beton
336 Kg Portland Semen
0.54 m3 Pasir Beton
0.81 m3 Kerikil Beton
0.105 m3 Balok Sengon
2.5 Lbr Plywood 9 mm
14 Btg Dolken diameter 8 / 4rm
C PERALATAN

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

IV A.4.1.1 HARGA SATUAN PEKERJAAN B E T O N


D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

29 A.4.1.1.35 1 m' Membuat Kolom Penguat Beton Bertulang (11 x 11) cm


A Tenaga
L.01 0.18 OH Pekerja
L.02 0.02 OH Tukang batu
L.02 0.02 OH Tukang Kayu
L.02 0.02 OH Tukang Besi
L.03 0.006 OH Kepala Tukang
L.04 0.009 OH Mandor
B Bahan
0.002 m3 Kayu Klas III (Terentang)
0.01 Kg Paku Biasa 2" - 5"
3 Kg Besi Beton Polos
0.045 Kg Kawat Beton
4 Kg Portland Semen
0.006 m3 Pasir Beton
0.009 m3 Kerikil Beton
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

30 A.4.1.1.36 1 m' Membuat Ring Balok Beton Bertulang (10 x 15) cm


A Tenaga
L.01 0.297 OH Pekerja
L.02 0.033 OH Tukang batu
L.02 0.033 OH Tukang Kayu
L.02 0.033 OH Tukang Besi
L.03 0.01 OH Kepala Tukang
L.04 0.015 OH Mandor

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

IV A.4.1.1 HARGA SATUAN PEKERJAAN B E T O N


B Bahan
0.003 m3 Kayu Klas III (Terentang)
0.02 Kg Paku Biasa 2" - 5"
3.6 Kg Besi Beton Polos
0.05 Kg Kawat Beton
5.5 Kg Portland Semen
0.009 m3 Pasir Beton
0.015 m3 Kerikil Beton
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

31 A.4.1.1.37 1 m3 Membuat Beton 1Pc : 2Ps : 3Kr


A Tenaga
L.01 2.00 OH Pekerja
L.02 0.350 OH Tukang Batu
L.03 0.035 OH Kepala Tukang
L.04 0.080 OH Mandor
B Bahan
336.00 Kg Semen portland
0.540 m3 Pasir beton
0.810 m3 Kerikil
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

32 A.4.1.1.38 1 m3 Membuat Beton 1Pc : 3Ps : 6Kr


A Tenaga
L.01 1.65 Oh Pekerja
L.02 0.250 Oh Tukang Batu
L.03 0.025 Oh Kepala Tukang
L.04 0.080 Oh Mandor
B Bahan
197.00 Kg Semen portland
0.470 m3 Pasir beton
0.940 m3 Kerikil
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

33 A.4.1.1.39 1 m3 Membuat Beton 1Pc : 3Ps : 5Kr


A Tenaga
L.01 1.65 Oh Pekerja

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

IV A.4.1.1 HARGA SATUAN PEKERJAAN B E T O N


L.02 0.250 Oh Tukang Batu
L.03 0.025 Oh Kepala Tukang
L.04 0.080 Oh Mandor
B Bahan
218.00 Kg Semen portland
0.520 m3 Pasir beton
0.870 m3 Kerikil
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

CK Boyolali
HARGA JUMLAH
PEKERJAAN BAHAN/UPAH
Rp Rp

Mpa (K100), slum (12±2)cm, w/c = 0,87 774,876.90


91,211.40
41,400.00 68,310.00
57,850.00 15,908.75
66,100.00 1,850.80
61,950.00 5,141.85
613,222.14
1,337.50 330,362.50
132.14 114,832.14
152.59 152,440.00
72.50 15,587.50

704,433.54
10% 70,443.35
774,876.90
0.10
Mpa (K125), slum (12±2)cm, w/c = 0,78 813,765.58
91,211.40
41,400.00 68,310.00
57,850.00 15,908.75
66,100.00 1,850.80
61,950.00 5,141.85
648,575.49
1,337.50 369,150.00
132.14 109,414.29
152.59 154,423.70
72.50 15,587.50

739,786.89
10% 73,978.69
813,765.58

2 Mpa (K150), slum (12±2)cm, w/c = 0,72 844,228.23


91,211.40
41,400.00 68,310.00
57,850.00 15,908.75
66,100.00 1,850.80
61,950.00 5,141.85
676,268.81
1,337.50 399,912.50
132.14 105,582.14
152.59 155,186.67
72.50 15,587.50

767,480.21
10% 76,748.02

CK Boyolali
HARGA JUMLAH
PEKERJAAN BAHAN/UPAH
Rp Rp

844,228.23

mutu f'c=7,4 MPa (K100), slum (3-6)cm, w/c = 0,87 729,443.18


66,289.00
41,400.00 49,680.00
57,850.00 11,570.00
66,100.00 1,322.00
61,950.00 3,717.00
596,841.16
1,337.50 307,625.00
132.14 118,003.57
152.59 156,712.59
72.50 14,500.00

663,130.16
10% 66,313.02
729,443.18

5 MPa (K175), slum (12±2)cm, w/c = 0,66 880,297.27


91,211.40
41,400.00 68,310.00
57,850.00 15,908.75
66,100.00 1,850.80
61,950.00 5,141.85
709,058.85
1,337.50 436,025.00
132.14 100,428.57
152.59 157,017.78
72.50 15,587.50

CK Boyolali
HARGA JUMLAH
PEKERJAAN BAHAN/UPAH
Rp Rp

800,270.25
10% 80,027.02
880,297.27

9 MPa (K200), slum (12±2)cm, w/c = 0,61 914,670.12


91,211.40
41,400.00 68,310.00
57,850.00 15,908.75
66,100.00 1,850.80
61,950.00 5,141.85
740,306.89
1,337.50 470,800.00
132.14 96,596.43
152.59 157,322.96
72.50 15,587.50

831,518.29
10% 83,151.83
914,670.12

3 MPa (K225), slum (12±2)cm, w/c = 0,58 940,512.71


91,211.40
41,400.00 68,310.00
57,850.00 15,908.75
66,100.00 1,850.80
61,950.00 5,141.85
763,800.16
1,337.50 496,212.50
132.14 92,235.71
152.59 159,764.44
72.50 15,587.50

855,011.56
10% 85,501.16
940,512.71

7 MPa (K250), slum (12±2)cm, w/c = 0,56 957,424.01


91,211.40
41,400.00 68,310.00
57,850.00 15,908.75
66,100.00 1,850.80
61,950.00 5,141.85
779,174.06
1,337.50 513,600.00
132.14 91,442.86

CK Boyolali
HARGA JUMLAH
PEKERJAAN BAHAN/UPAH
Rp Rp

152.59 158,543.70
72.50 15,587.50

870,385.46
10% 87,038.55
957,424.01

mutu f'c=24,0 MPa (K275), slum (12±2)cm, w/c = 0,53 986,446.58


91,211.40
41,400.00 68,310.00
57,850.00 15,908.75
66,100.00 1,850.80
61,950.00 5,141.85
805,558.21
1,337.50 543,025.00
132.14 90,385.71
152.59 156,560.00
72.50 15,587.50

896,769.61
10% 89,676.96
986,446.58

4 MPa (K300), slum (12±2)cm, w/c = 0,52 995,470.00


91,211.40
41,400.00 68,310.00
57,850.00 15,908.75
66,100.00 1,850.80
61,950.00 5,141.85

CK Boyolali
HARGA JUMLAH
PEKERJAAN BAHAN/UPAH
Rp Rp

813,761.32
1,337.50 552,387.50
132.14 89,989.29
152.59 155,797.04
72.50 15,587.50

904,972.72
10% 90,497.27
995,470.00

8 MPa (K325), slum (12±2)cm, w/c = 0,49 1,056,879.57


116,005.75
41,400.00 86,940.00
57,850.00 20,247.50
66,100.00 2,313.50
61,950.00 6,504.75
844,793.86
1,337.50 587,162.50
132.14 88,535.71
152.59 153,508.15
72.50 15,587.50

960,799.61
10% 96,079.96
1,056,879.57

2 MPa (K350), slum (12±2)cm, w/c = 0,48 1,068,677.64


116,005.75
41,400.00 86,940.00
57,850.00 20,247.50
66,100.00 2,313.50
61,950.00 6,504.75
855,519.38
1,337.50 599,200.00
132.14 88,139.29
152.59 152,592.59
72.50 15,587.50

971,525.13
10% 97,152.51
1,068,677.64

126,514.30
7,658.00
41,400.00 2,898.00
57,850.00 4,049.50

CK Boyolali
HARGA JUMLAH
PEKERJAAN BAHAN/UPAH
Rp Rp

66,100.00 462.70
61,950.00 247.80
107,355.00
10,000.00 105,000.00
15,700.00 2,355.00

115,013.00
10% 11,501.30
126,514.30
untuk 1 Kg 12,651.43

134,820.73
40,964.30
41,400.00 21,528.00
61,950.00 16,107.00
66,100.00 1,718.60
61,950.00 1,610.70
81,600.00
1,900,000.00 76,000.00
14,000.00 4,200.00
14,000.00 1,400.00

122,564.30
10% 12,256.43
134,820.73

145,270.73
40,964.30
41,400.00 21,528.00
61,950.00 16,107.00
66,100.00 1,718.60
61,950.00 1,610.70

CK Boyolali
HARGA JUMLAH
PEKERJAAN BAHAN/UPAH
Rp Rp

91,100.00
1,900,000.00 85,500.00
14,000.00 4,200.00
14,000.00 1,400.00

132,064.30
10% 13,206.43
145,270.73

269,547.47
51,993.15
41,400.00 27,324.00
61,950.00 20,443.50
66,100.00 2,181.30
61,950.00 2,044.35
193,050.00
1,900,000.00 76,000.00
14,000.00 5,600.00
14,000.00 2,800.00
2,300,000.00 34,500.00
109,000.00 38,150.00
18,000.00 36,000.00

245,043.15
10% 24,504.32
269,547.47

277,137.47
51,993.15
41,400.00 27,324.00
61,950.00 20,443.50
66,100.00 2,181.30
61,950.00 2,044.35
199,950.00
1,900,000.00 76,000.00
14,000.00 5,600.00
14,000.00 2,800.00
2,300,000.00 41,400.00
109,000.00 38,150.00
18,000.00 36,000.00

251,943.15
10% 25,194.32
277,137.47

348,747.47

CK Boyolali
HARGA JUMLAH
PEKERJAAN BAHAN/UPAH
Rp Rp

51,993.15
41,400.00 27,324.00
61,950.00 20,443.50
66,100.00 2,181.30
61,950.00 2,044.35
265,050.00
1,900,000.00 76,000.00
14,000.00 5,600.00
14,000.00 2,800.00
2,300,000.00 34,500.00
109,000.00 38,150.00
18,000.00 108,000.00

317,043.15
10% 31,704.32
348,747.47

303,097.47
51,993.15
41,400.00 27,324.00
61,950.00 20,443.50
66,100.00 2,181.30
61,950.00 2,044.35
223,550.00
1,900,000.00 57,000.00
14,000.00 5,600.00
14,000.00 2,800.00
2,300,000.00 46,000.00
109,000.00 38,150.00
18,000.00 54,000.00
5,000.00 20,000.00

CK Boyolali
HARGA JUMLAH
PEKERJAAN BAHAN/UPAH
Rp Rp

275,543.15
10% 27,554.32
303,097.47

247,877.47
51,993.15
41,400.00 27,324.00
61,950.00 20,443.50
66,100.00 2,181.30
61,950.00 2,044.35
173,350.00
1,900,000.00 57,000.00
14,000.00 5,600.00
14,000.00 2,100.00
2,300,000.00 34,500.00
109,000.00 38,150.00
18,000.00 36,000.00

225,343.15
10% 22,534.32
247,877.47

85,462.96
10,133.60
41,400.00 6,210.00
61,950.00 3,097.50
66,100.00 330.50
61,950.00 495.60
67,560.00
1,900,000.00 50,160.00
14,000.00 8,400.00
18,000.00 9,000.00

77,693.60
10% 7,769.36
85,462.96

lang (150 kg Besi + Bekisting) 3,457,768.82


410,341.20
41,400.00 219,420.00
57,850.00 15,908.75
61,950.00 80,535.00
57,850.00 60,742.50
66,100.00 17,318.20
61,950.00 16,416.75

CK Boyolali
HARGA JUMLAH
PEKERJAAN BAHAN/UPAH
Rp Rp

2,733,085.00
1,900,000.00 380,000.00
14,000.00 21,000.00
14,000.00 5,600.00
10,000.00 1,575,000.00
15,700.00 35,325.00
1,337.50 449,400.00
185,000.00 99,900.00
206,000.00 166,860.00

3,143,426.20
10% 314,342.62
3,457,768.82

g (200 kg Besi + Bekisting) 4,266,892.19


466,332.90
41,400.00 233,910.00
57,850.00 15,908.75
61,950.00 96,642.00
57,850.00 80,990.00
66,100.00 21,350.30
61,950.00 17,531.85
3,412,660.00
1,900,000.00 513,000.00
14,000.00 28,000.00
14,000.00 8,400.00
10,000.00 2,100,000.00
15,700.00 47,100.00
1,337.50 449,400.00
185,000.00 99,900.00
206,000.00 166,860.00

CK Boyolali
HARGA JUMLAH
PEKERJAAN BAHAN/UPAH
Rp Rp

3,878,992.90
10% 387,899.29
4,266,892.19

ng (300 kg Besi + Bekisting) 7,092,027.69


579,987.90
41,400.00 291,870.00
57,850.00 15,908.75
61,950.00 102,217.50
57,850.00 121,485.00
66,100.00 26,638.30
61,950.00 21,868.35
5,867,310.00
1,900,000.00 760,000.00
14,000.00 56,000.00
14,000.00 28,000.00
10,000.00 3,150,000.00
15,700.00 70,650.00
1,337.50 449,400.00
185,000.00 99,900.00
206,000.00 166,860.00
2,300,000.00 345,000.00
109,000.00 381,500.00
18,000.00 360,000.00

6,447,297.90
10% 644,729.79
7,092,027.69

ng (200 kg Besi + Bekisting) 5,453,115.42


503,717.65
41,400.00 262,890.00
57,850.00 15,908.75
61,950.00 102,217.50
57,850.00 80,990.00
66,100.00 22,011.30
61,950.00 19,700.10
4,453,660.00
1,900,000.00 608,000.00
14,000.00 44,800.00
14,000.00 22,400.00
10,000.00 2,100,000.00
15,700.00 47,100.00
1,337.50 449,400.00
185,000.00 99,900.00

CK Boyolali
HARGA JUMLAH
PEKERJAAN BAHAN/UPAH
Rp Rp

206,000.00 166,860.00
2,300,000.00 322,000.00
109,000.00 305,200.00
18,000.00 288,000.00

4,957,377.65
10% 495,737.77
5,453,115.42

(150 kg besi + bekisting) 5,026,366.95


410,539.50
41,400.00 219,420.00
57,850.00 15,908.75
61,950.00 80,535.00
57,850.00 60,742.50
66,100.00 17,516.50
61,950.00 16,416.75
4,158,885.00
1,900,000.00 608,000.00
14,000.00 44,800.00
14,000.00 22,400.00
10,000.00 1,575,000.00
15,700.00 35,325.00
1,337.50 449,400.00
185,000.00 99,900.00
206,000.00 166,860.00
2,300,000.00 276,000.00
109,000.00 305,200.00
18,000.00 576,000.00

4,569,424.50
10% 456,942.45
5,026,366.95

CK Boyolali
HARGA JUMLAH
PEKERJAAN BAHAN/UPAH
Rp Rp

lang (150 kg Besi + Bekisting) 4,801,748.82


410,341.20
41,400.00 219,420.00
57,850.00 15,908.75
61,950.00 80,535.00
57,850.00 60,742.50
66,100.00 17,318.20
61,950.00 16,416.75
3,954,885.00
1,900,000.00 456,000.00
14,000.00 44,800.00
14,000.00 22,400.00
10,000.00 1,575,000.00
15,700.00 35,325.00
1,337.50 449,400.00
185,000.00 99,900.00
206,000.00 166,860.00
2,300,000.00 368,000.00
109,000.00 305,200.00
18,000.00 432,000.00

4,365,226.20
10% 436,522.62
4,801,748.82

lang (200 kg Besi + Bekisting) 5,092,332.19


466,332.90
41,400.00 233,910.00
57,850.00 15,908.75
61,950.00 96,642.00
57,850.00 80,990.00
66,100.00 21,350.30
61,950.00 17,531.85
4,163,060.00
1,900,000.00 475,000.00
14,000.00 42,000.00
14,000.00 16,800.00
10,000.00 2,100,000.00
15,700.00 47,100.00
1,337.50 449,400.00
185,000.00 99,900.00
206,000.00 166,860.00
2,300,000.00 241,500.00
109,000.00 272,500.00
18,000.00 252,000.00

CK Boyolali
HARGA JUMLAH
PEKERJAAN BAHAN/UPAH
Rp Rp

4,629,392.90
10% 462,939.29
5,092,332.19

n Bertulang (11 x 11) cm 60,411.62


11,959.15
41,400.00 7,452.00
57,850.00 1,157.00
61,950.00 1,239.00
57,850.00 1,157.00
66,100.00 396.60
61,950.00 557.55
42,960.50
1,900,000.00 3,800.00
14,000.00 140.00
10,000.00 30,000.00
15,700.00 706.50
1,337.50 5,350.00
185,000.00 1,110.00
206,000.00 1,854.00

54,919.65
10% 5,491.97
60,411.62

rtulang (10 x 15) cm 82,087.23


19,748.50
41,400.00 12,295.80
57,850.00 1,909.05
61,950.00 2,044.35
57,850.00 1,909.05
66,100.00 661.00
61,950.00 929.25

CK Boyolali
HARGA JUMLAH
PEKERJAAN BAHAN/UPAH
Rp Rp

54,876.25
1,900,000.00 5,700.00
14,000.00 280.00
10,000.00 36,000.00
15,700.00 785.00
1,337.50 7,356.25
185,000.00 1,665.00
206,000.00 3,090.00

74,624.75
10% 7,462.48
82,087.23

909,124.70
110,317.00
41,400.00 82,800.00
57,850.00 20,247.50
66,100.00 2,313.50
61,950.00 4,956.00
716,160.00
1,337.50 449,400.00
185,000.00 99,900.00
206,000.00 166,860.00

826,477.00
10% 82,647.70
909,124.70

696,804.35
89,381.00
41,400.00 68,310.00
57,850.00 14,462.50
66,100.00 1,652.50
61,950.00 4,956.00
544,077.50
1,337.50 263,487.50
185,000.00 86,950.00
206,000.00 193,640.00

633,458.50
10% 63,345.85
696,804.35

722,013.60
89,381.00
41,400.00 68,310.00

CK Boyolali
HARGA JUMLAH
PEKERJAAN BAHAN/UPAH
Rp Rp

57,850.00 14,462.50
66,100.00 1,652.50
61,950.00 4,956.00
566,995.00
1,337.50 291,575.00
185,000.00 96,200.00
206,000.00 179,220.00

656,376.00
10% 65,637.60
722,013.60

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

V A.4.2.1 HARGA SATUAN PEKERJAAN BESI & ALLUMUNIUM


1 A.4.2.1.1 1 Kg Pemasangan Besi Profil
A Tenaga
L.01 0.06 OH Pekerja
L.02 0.06 OH Tukang Besi
L.03 0.006 OH Kepala Tukang
L.04 0.003 OH Mandor
B Bahan
1.15 Kg Besi Profil
0.06 Kg Meni Besi
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

2 A.4.2.1.2 1 kg Pemasangan Rangka Kuda-kuda Baja IWF


A Tenaga
L.01 0.06 OH Pekerja
L.02 0.06 OH Tukang Besi
L.03 0.006 OH Kepala Tukang
L.04 0.003 OH Mandor
B Bahan
1.15 kg Besi Baja IWF
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

3 A.4.2.1.4 1 m2 Pembuatan Pintu Besi Plat Baja tebal 2 mm rangkap, rangk


A Tenaga
L.01 1.05 OH Pekerja
L.02 1.05 OH Tukang Besi
L.03 0.105 OH Kepala Tukang
L.04 0.052 OH Mandor
B Bahan
15 Kg Besi Siku L.30.30.3
32.8 Kg Besi Plat Baja
0.05 Kg Kawat Las
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

V A.4.2.1 HARGA SATUAN PEKERJAAN BESI & ALLUMUNIUM


4 A.4.2.1.5 10 cm Pengerjaan Pengelasan dengan Las Listrik
A Tenaga
L.01 0.04 OH Pekerja
L.02 0.02 OH Tukang Besi
L.03 0.002 OH Kepala Tukang
L.04 0.002 OH Mandor
B Bahan
0.4 kg Kawat Las
0.3 ltr Solar
0.4 ltr Minyak Pelumas
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

5 A.4.2.1.7 1 m2 Pemasangan Pintu Rolling Door Besi


A Tenaga
L.01 1.2 OH Pekerja
L.02 1.2 OH Tukang Besi
L.03 0.12 OH Kepala Tukang
L.04 0.006 OH Mandor
B Bahan
1 m2 Pintu Gulung Besi
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

V A.4.2.1 HARGA SATUAN PEKERJAAN BESI & ALLUMUNIUM


6 A.4.2.1.8 1 m2 Pemasangan Pintu Lipat (Folding Door) 0.8 mm
A Tenaga
L.01 0.44 OH Pekerja
L.02 0.44 OH Tukang Besi
L.03 0.044 OH Kepala Tukang
L.04 0.022 OH Mandor
B Bahan
1 m2 Pintu Lipat
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

7 A.4.2.1.10 1 m2 Pemasangan Rolling Door Allumunium


A Tenaga
L.01 1 OH Pekerja
L.02 1 OH Tukang Besi
L.03 0.1 OH Kepala Tukang
L.04 0.05 OH Mandor
B Bahan
1 m2 Rolling Allumunium
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

8 A.4.2.1.11a 1 m' Pemasangan Kusen Pintu Allumunium Putih 4'


A Tenaga
L.01 0.043 OH Pekerja
L.02 0.043 OH Tukang Besi
L.03 0.0043 OH Kepala Tukang
L.04 0.0021 OH Mandor
B Bahan
1.1 m' Profil Allumunium
2 buah Skrup Fixer
0.06 Tube Sealant
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

9 A.4.2.1.11b 1 m' Pemasangan Kusen Pintu Allumunium Coklat 4'

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

V A.4.2.1 HARGA SATUAN PEKERJAAN BESI & ALLUMUNIUM


A Tenaga
L.01 0.043 OH Kepala Tukang
L.02 0.043 OH Mandor
L.03 0.0043 OH Bahan
L.04 0.0021 OH Profil Allumunium
B Bahan
1.1 m' Profil Allumunium
2 buah Skrup Fixer
0.06 Tube Sealant
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

10 A.4.2.1.13a 1 m2 Pemasangan Pintu Kaca Rangka Allumunium Putih


A Tenaga
L.01 0.085 OH Pekerja
L.02 0.085 OH Tukang Besi
L.03 0.009 OH Kepala Tukang
L.04 0.005 OH Mandor
B Bahan
4.4 m' Pintu Allumunium
4.5 m' Profil Kaca
0.27 tube Sealant
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

V A.4.2.1 HARGA SATUAN PEKERJAAN BESI & ALLUMUNIUM


11 A.4.2.1.13b 1 m2 Pemasangan Pintu Kaca Rangka Allumunium Coklat
A Tenaga
L.01 0.085 OH Tukang Besi
L.02 0.085 OH Kepala Tukang
L.03 0.009 OH Mandor
L.04 0.005 OH Bahan
B Bahan
4.4 m' Pintu Allumunium
4.5 m' Profil Kaca
0.27 tube Sealant
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

12 A.4.2.1.14 1 m2 Pemasangan Venetions Blinds & Vertical Blinds


A Tenaga
L.01 0.35 OH Pekerja
L.02 0.35 OH Tukang Besi
L.03 0.035 OH Kepala Tukang
L.04 0.018 OH Mandor
B Bahan
1 m2 Venetions Blinds atau Vertical Blinds (tirai)
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

13 A.4.2.1.15 1 m2 Pemasangan Terali Besi Strip (2x3) cm


A Tenaga
L.01 1.67 OH Pekerja
L.02 1.67 OH Tukang Las
L.03 0.167 OH Kepala Tukang
L.04 0.083 OH Mandor
B Bahan
6.177 m' Besi Strip 2x3
27.08 cm Pengelasan
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

V A.4.2.1 HARGA SATUAN PEKERJAAN BESI & ALLUMUNIUM


14 A.4.2.1.17a 1 m2 Pemasangan Jendela Nako rayban 5 mm & Tralis
A Tenaga
L.01 0.2 OH Pekerja
L.02 0.2 OH Tukang Kayu
L.03 0.02 OH Kepala Tukang
L.04 0.001 OH Mandor
B Bahan
1.1 m2 Jendela Nako
10 buah Paku Skrup 1 - 2,5 cm
7 m' Besi Strip 2x3
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

15 A.4.2.1.17b 1 m2 Pemasangan Jendela Nako bening 5 mm & Tralis


A Tenaga
L.01 0.2 OH Pekerja
L.02 0.2 OH Tukang Kayu
L.03 0.02 OH Kepala Tukang
L.04 0.001 OH Mandor
B Bahan
1.1 m2 Jendela Nako
10 buah Paku Skrup 1 - 2,5 cm
7 m' Besi Strip 2x3
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

V A.4.2.1 HARGA SATUAN PEKERJAAN BESI & ALLUMUNIUM


16 A.4.2.1.18 1 m' Pemasangan Talang Datar/Jurai , Seng BJLS 30 Lebar 90 cm
A Tenaga
L.01 0.20 OH Pekerja
L.02 0.2 OH Tukang Kayu
L.03 0.020 OH Kepala Tukang
L.04 0.01 OH Mandor
B Bahan
1.05 m' Seng BJLS 30 Lebar 90 cm
0.015 Kg Paku Biasa 1 - 2,5 cm
0.019 m3 Kayu Papan Klas II atau III
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

17 A.4.2.1.18a 1 m' Pemasangan Talang 1/2 Lingkaran Ø 15 cm, Seng Plaat BJL
A Tenaga
L.01 0.15 OH Pekerja
L.02 0.3 OH Tukang Kayu
L.03 0.03 OH Kepala Tukang
L.04 0.008 OH Mandor
B Bahan
1.05 m' Seng Plaat BJLS 30 Lebar 60 cm
0.01 Kg Paku Biasa 1 - 2,5 cm
0.5 Kg Besi strip
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

18 A.4.2.1.20 1 m2 Pemasangan 1 m2 rangka besi hollow 1x40.40.2 mm, modu


A Tenaga
L.01 0.25 OH Pekerja
L.02 0.25 OH Tukang Besi
L.03 0.025 OH Kepala Tukang
L.04 0.013 OH Mandor
B Bahan
3.5 m' Rangka metal hollow 40.40.2 mm
100% x rangka Ls Assesoris (perkuatan, lad, dll)
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

V A.4.2.1 HARGA SATUAN PEKERJAAN BESI & ALLUMUNIUM


F Harga Satuan Pekerjaan (D+E)

19 A.4.2.1.21 1 m2 Pemasangan 1 m2 rangka besi hollow 1x40.40.2 mm, modu


A Tenaga
L.01 0.35 OH Tenaga
L.02 0.35 OH Pekerja
L.03 0.035 OH Tukang Besi
L.04 0.018 OH Kepala Tukang
B Bahan
4 m' Rangka metal hollow 40.40.2 mm
100% x rangka Ls Assesoris (perkuatan, lad, dll)
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
BESI & ALLUMUNIUM
23,537.20
6,537.45
41,400.00 2,484.00
57,850.00 3,471.00
66,100.00 396.60
61,950.00 185.85
14,860.00
11,500.00 13,225.00
27,250.00 1,635.00

21,397.45
10% 2,139.75
23,537.20

25,913.20
6,537.45
41,400.00 2,484.00
57,850.00 3,471.00
66,100.00 396.60
61,950.00 185.85
17,020.00
14,800.00 17,020.00

23,557.45
10% 2,355.75
25,913.20

ja tebal 2 mm rangkap, rangka baja Siku 464,919.84


114,374.40
41,400.00 43,470.00
57,850.00 60,742.50
66,100.00 6,940.50
61,950.00 3,221.40
308,280.00
11,500.00 172,500.00
4,100.00 134,480.00
26,000.00 1,300.00

422,654.40
10% 42,265.44
464,919.84

CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
BESI & ALLUMUNIUM
23,836.01
3,069.10
41,400.00 1,656.00
57,850.00 1,157.00
66,100.00 132.20
61,950.00 123.90
18,600.00
26,000.00 10,400.00
6,400.00 1,920.00
15,700.00 6,280.00

21,669.10
10% 2,166.91
23,836.01
Untuk 1 cm 2,383.60

453,644.07
127,403.70
41,400.00 49,680.00
57,850.00 69,420.00
66,100.00 7,932.00
61,950.00 371.70
285,000.00
285,000.00 285,000.00

412,403.70
10% 41,240.37
453,644.07

CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
BESI & ALLUMUNIUM
ding Door) 0.8 mm 652,675.43
47,941.30
41,400.00 18,216.00
57,850.00 25,454.00
66,100.00 2,908.40
61,950.00 1,362.90
545,400.00
545,400.00 545,400.00

593,341.30
10% 59,334.13
652,675.43

607,153.25
108,957.50
41,400.00 41,400.00
57,850.00 57,850.00
66,100.00 6,610.00
61,950.00 3,097.50
443,000.00
443,000.00 443,000.00

551,957.50
10% 55,195.75
607,153.25

munium Putih 4' 209,750.28


4,682.08
41,400.00 1,780.20
57,850.00 2,487.55
66,100.00 284.23
61,950.00 130.10
186,000.00
165,000.00 181,500.00
750.00 1,500.00
50,000.00 3,000.00

190,682.08
10% 19,068.21
209,750.28

munium Coklat 4' 161,350.28

CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
BESI & ALLUMUNIUM
4,682.08
41,400.00 1,780.20
57,850.00 2,487.55
66,100.00 284.23
61,950.00 130.10
142,000.00
125,000.00 137,500.00
750.00 1,500.00
50,000.00 3,000.00

146,682.08
10% 14,668.21
161,350.28

ka Allumunium Putih 848,474.99


9,340.90
41,400.00 3,519.00
57,850.00 4,917.25
66,100.00 594.90
61,950.00 309.75
762,000.00
165,000.00 726,000.00
5,000.00 22,500.00
50,000.00 13,500.00

771,340.90
10% 77,134.09
848,474.99

CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
BESI & ALLUMUNIUM
ka Allumunium Coklat 654,874.99
9,340.90
41,400.00 3,519.00
57,850.00 4,917.25
66,100.00 594.90
61,950.00 309.75
586,000.00
125,000.00 550,000.00
5,000.00 22,500.00
50,000.00 13,500.00

595,340.90
10% 59,534.09
654,874.99

s & Vertical Blinds 146,482.71


38,166.10
41,400.00 14,490.00
57,850.00 20,247.50
66,100.00 2,313.50
61,950.00 1,115.10
95,000.00
95,000.00 95,000.00

133,166.10
10% 13,316.61
146,482.71

273,909.39
181,928.05
41,400.00 69,138.00
57,850.00 96,609.50
66,100.00 11,038.70
61,950.00 5,141.85
67,080.49
410.00 2,532.57
2,383.60 64,547.92

249,008.54
10% 24,900.85
273,909.39

CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
BESI & ALLUMUNIUM
yban 5 mm & Tralis 129,386.35
22,053.95
41,400.00 8,280.00
61,950.00 12,390.00
66,100.00 1,322.00
61,950.00 61.95
95,570.00
82,000.00 90,200.00
250.00 2,500.00
410.00 2,870.00

117,623.95
10% 11,762.40
129,386.35

ning 5 mm & Tralis 140,276.35


22,053.95
41,400.00 8,280.00
61,950.00 12,390.00
66,100.00 1,322.00
61,950.00 61.95
105,470.00
91,000.00 100,100.00
250.00 2,500.00
410.00 2,870.00

127,523.95
10% 12,752.40
140,276.35

CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
BESI & ALLUMUNIUM
rai , Seng BJLS 30 Lebar 90 cm 161,322.15
22,611.50
41,400.00 8,280.00
61,950.00 12,390.00
66,100.00 1,322.00
61,950.00 619.50
124,045.00
34,700.00 36,435.00
14,000.00 210.00
4,600,000.00 87,400.00

146,656.50
10% 14,665.65
161,322.15

karan Ø 15 cm, Seng Plaat BJLS 30 Lebar 60 cm 60,014.46


27,273.60
41,400.00 6,210.00
61,950.00 18,585.00
66,100.00 1,983.00
61,950.00 495.60
27,285.00
23,900.00 25,095.00
14,000.00 140.00
4,100.00 2,050.00

54,558.60
10% 5,455.86
60,014.46

i hollow 1x40.40.2 mm, modul 60 x 120 cm, dinding partisi 78,122.39


27,270.35
41,400.00 10,350.00
57,850.00 14,462.50
66,100.00 1,652.50
61,950.00 805.35
43,750.00
6,250.00 21,875.00
21,875.00

71,020.35
10% 7,102.04

CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
BESI & ALLUMUNIUM
78,122.39

i hollow 1x40.40.2 mm, modul 60 x 60 cm, plafon 96,982.71


38,166.10
41,400.00 14,490.00
57,850.00 20,247.50
66,100.00 2,313.50
61,950.00 1,115.10
50,000.00
6,250.00 25,000.00
25,000.00

88,166.10
10% 8,816.61
96,982.71

CK Boyolali
238,360.00

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

VI A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING


1 A.4.4.1.1 1 m2 Pemasangan Dinding Bata Merah ukuran (5x11x22) c
A Tenaga
L.01 0.6 OH Pekerja
L.02 0.2 OH Tukang Batu
L.03 0.02 OH Kepala Tukang Batu
L.04 0.03 OH Mandor
B Bahan
140 Buah Bata Merah
43.5 Kg Portland Semen (PC)
0.08 m3 Pasir Pasang (PP)
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
Overhead & Profit
2 A.4.4.1.2 1 m2 Pemasangan Dinding Bata Merah Ukuran (5x11x22) c
A Tenaga
L.01 0.6 OH Pekerja
L.02 0.2 OH Tukang Batu
L.03 0.02 OH Kepala Tukang Batu
L.04 0.03 OH Mandor
B Bahan
140 Buah Bata Merah
32.95 Kg Portland Semen (PC)
0.091 m3 Pasir Pasang (PP)
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

3 A.4.4.1.3 1 m2 Pemasangan Dinding Bata Merah Ukuran (5x11x22) c


A Tenaga
L.01 0.6 OH Pekerja
L.02 0.2 OH Tukang Batu
L.03 0.02 OH Kepala Tukang Batu
L.04 0.03 OH Mandor
B Bahan

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

VI A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING


140 Buah Bata Merah
26.55 Kg Portland Semen (PC)
0.093 m3 Pasir Pasang (PP)
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

4 A.4.4.1.4 1 m2 Pemasangan Dinding Bata Merah Ukuran (5x11x22) c


A Tenaga
L.01 0.6 OH Pekerja
L.02 0.2 OH Tukang Batu
L.03 0.02 OH Kepala Tukang Batu
L.04 0.03 OH Mandor
B Bahan
140 Buah Bata Merah
22.2 Kg Portland Semen (PC)
0.102 m3 Pasir Pasang (PP)
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

5 A.4.4.1.5 1 m2 Pemasangan Dinding Bata Merah Ukuran (5x11x22) c


A Tenaga
L.01 0.6 OH Pekerja
L.02 0.2 OH Tukang Batu
L.03 0.02 OH Kepala Tukang Batu
L.04 0.03 OH Mandor

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

VI A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING


B Bahan
140 Buah Bata Merah
18.5 Kg Portland Semen (PC)
0.122 m3 Pasir Pasang (PP)
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

6 A.4.4.1.6 1 m2 Pemasangan Dinding Bata Merah Ukuran (5x11x22) c


A Tenaga
L.01 0.6 OH Pekerja
L.02 0.2 OH Tukang Batu
L.03 0.02 OH Kepala Tukang Batu
L.04 0.03 OH Mandor
B Bahan
140 Buah Bata Merah
10.08 Kg Portland Semen (PC)
0.0925 m3 Pasir Pasang (PP)
0.0275 m3 Kapur Pasang (KP)
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

7 A.4.4.1.7 1 m2 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm


A Tenaga
L.01 0.30 OH Pekerja
L.02 0.1 OH Tukang Batu
L.03 0.01 OH Kepala Tukang
L.04 0.015 OH Mandor
B Bahan
70 Buah Bata Merah 5 x 11 x 22
18.95 Kg Portland Semen
0.038 m3 Pasir Pasang
C PERALATAN
D Jumlah A + B + C

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

VI A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING


E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

8 A.4.4.1.8 1 m2 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm


A Tenaga
L.01 0.30 OH Pekerja
L.02 0.1 OH Tukang Batu
L.03 0.01 OH Kepala Tukang
L.04 0.015 OH Mandor
B Bahan
70 Buah Bata Merah 5 x 11 x 22
14.37 Kg Portland Semen
0.04 m3 Pasir Pasang
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

9 A.4.4.1.9 1 m2 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm


A Tenaga
L.01 0.30 OH Pekerja
L.02 0.1 OH Tukang Batu
L.03 0.01 OH Kepala Tukang
L.04 0.015 OH Mandor
B Bahan
70 Buah Bata Merah 5 x 11 x 22
11.50 Kg Portland Semen
0.043 m3 Pasir Pasang
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

VI A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING


10 A.4.4.1.10 1 m2 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm
A Tenaga
L.01 0.30 OH Pekerja
L.02 0.1 OH Tukang Batu
L.03 0.01 OH Kepala Tukang
L.04 0.015 OH Mandor
B Bahan
70 Buah Bata Merah 5 x 11 x 22
9.68 Kg Portland Semen
0.045 m3 Pasir Pasang
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

11 A.4.4.1.11 1 m2 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm


A Tenaga
L.01 0.30 OH Pekerja
L.02 0.1 OH Tukang Batu
L.03 0.01 OH Kepala Tukang
L.04 0.015 OH Mandor
B Bahan
70 Buah Bata Merah 5 x 11 x 22
8.32 Kg Portland Semen
0.049 m3 Pasir Pasang
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

12 A.4.4.1.12 1 m2 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm


A Tenaga
L.01 0.30 OH Pekerja
L.02 0.1 OH Tukang Batu
L.03 0.01 OH Kepala Tukang
L.04 0.015 OH Mandor
B Bahan

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

VI A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING


70 Buah Bata Merah 5 x 11 x 22
6.50 Kg Portland Semen
0.05 m3 Pasir Pasang
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

13 A.4.4.1.13 1 m2 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm


A Tenaga
L.01 0.30 OH Pekerja
L.02 0.1 OH Tukang Batu
L.03 0.01 OH Kepala Tukang
L.04 0.015 OH Mandor
B Bahan
70 Buah Bata Merah 5 x 11 x 22
4.5 Kg Portland Semen
0.05 m3 Pasir Pasang
0.015 m3 Kapur Padam
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

14 A.4.4.1.16 1 m2 Pemasangan Dinding HB/CB 10, speci camp. 1SP : 3PP


A Tenaga
L.01 0.300 OH Pekerja
L.02 0.100 OH Tukang Batu
L.03 0.010 OH Kepala Tukang
L.04 0.015 OH Mandor
B Bahan
12.500 buah Batako
15.160 kg PC
0.364 m3 Pasir Pasang
0.280 kg Besi Angkur Ø 8 mm
C PERALATAN
D Jumlah A + B + C

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

VI A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING


E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

15 A.4.4.1.17 1 m2 Pemasangan Dinding HB/CB 10, speci camp. 1SP : 4PP


A Tenaga
L.01 0.300 OH Pekerja
L.02 0.100 OH Tukang Batu
L.03 0.010 OH Kepala Tukang
L.04 0.015 OH Mandor
B Bahan
12.500 buah Batako
12.130 kg PC
0.388 m3 Pasir Pasang
0.280 kg Besi Angkur Ø 8 mm
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

16 A.4.4.1.22 1 m2 Pemasangan Dinding Terawang (Rooster) Uk, (12x11x


A Tenaga
L.01 0.30 OH Pekerja
L.02 0.1 OH Tukang Batu
L.03 0.01 OH Kepala Tukang
L.04 0.015 OH Mandor
B Bahan
30 Buah Terawang / Roster
11 kg Portland Semen
0.035 m3 Pasir Pasang
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

CK Boyolali
HARGA JUMLAH
N PEKERJAAN BAHAN/UPAH
Rp Rp
ASANGAN DINDING
rah ukuran (5x11x22) cm Tebal 1 bata Camp. 1SP: 2PP 223,928.93
39,590.50
41,400.00 24,840.00
57,850.00 11,570.00
66,100.00 1,322.00
61,950.00 1,858.50
163,981.25
650.00 91,000.00
1,337.50 58,181.25
185,000.00 14,800.00

203,571.75
10% 20,357.18
223,928.93

rah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 3PP 210,645.74


39,590.50
41,400.00 24,840.00
57,850.00 11,570.00
66,100.00 1,322.00
61,950.00 1,858.50
151,905.63
650.00 91,000.00
1,337.50 44,070.63
185,000.00 16,835.00

191,496.13
10% 19,149.61
210,645.74

rah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 4PP 201,636.74


39,590.50
41,400.00 24,840.00
57,850.00 11,570.00
66,100.00 1,322.00
61,950.00 1,858.50
143,715.63

CK Boyolali
HARGA JUMLAH
N PEKERJAAN BAHAN/UPAH
Rp Rp
ASANGAN DINDING
650.00 91,000.00
1,337.50 35,510.63
185,000.00 17,205.00

183,306.13
10% 18,330.61
201,636.74

rah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 5PP 197,068.30


39,590.50
41,400.00 24,840.00
57,850.00 11,570.00
66,100.00 1,322.00
61,950.00 1,858.50
139,562.50
650.00 91,000.00
1,337.50 29,692.50
185,000.00 18,870.00

179,153.00
10% 17,915.30
197,068.30

rah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 6PP 195,694.68


39,590.50
41,400.00 24,840.00
57,850.00 11,570.00
66,100.00 1,322.00
61,950.00 1,858.50

CK Boyolali
HARGA JUMLAH
N PEKERJAAN BAHAN/UPAH
Rp Rp
ASANGAN DINDING
138,313.75
650.00 91,000.00
1,337.50 24,743.75
185,000.00 22,570.00

177,904.25
10% 17,790.43
195,694.68

rah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 3 KP 183,293.00


39,590.50
41,400.00 24,840.00
57,850.00 11,570.00
66,100.00 1,322.00
61,950.00 1,858.50
127,039.50
650.00 91,000.00
1,337.50 13,482.00
185,000.00 17,112.50
198,000.00 5,445.00

166,630.00
10% 16,663.00
183,293.00

rah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 2PP 107,437.96
19,795.25
41,400.00 12,420.00
57,850.00 5,785.00
66,100.00 661.00
61,950.00 929.25
77,875.63
650.00 45,500.00
1,337.50 25,345.63
185,000.00 7,030.00

97,670.88

CK Boyolali
HARGA JUMLAH
N PEKERJAAN BAHAN/UPAH
Rp Rp
ASANGAN DINDING
10% 9,767.09
107,437.96

rah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 3PP 101,106.64
19,795.25
41,400.00 12,420.00
57,850.00 5,785.00
66,100.00 661.00
61,950.00 929.25
72,119.88
650.00 45,500.00
1,337.50 19,219.88
185,000.00 7,400.00

91,915.13
10% 9,191.51
101,106.64

rah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 4PP 97,494.65
19,795.25
41,400.00 12,420.00
57,850.00 5,785.00
66,100.00 661.00
61,950.00 929.25
68,836.25
650.00 45,500.00
1,337.50 15,381.25
185,000.00 7,955.00

88,631.50
10% 8,863.15
97,494.65

CK Boyolali
HARGA JUMLAH
N PEKERJAAN BAHAN/UPAH
Rp Rp
ASANGAN DINDING
rah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 5PP 95,223.98
19,795.25
41,400.00 12,420.00
57,850.00 5,785.00
66,100.00 661.00
61,950.00 929.25
66,772.00
650.00 45,500.00
1,337.50 12,947.00
185,000.00 8,325.00

86,567.25
10% 8,656.73
95,223.98

rah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 6PP 94,037.08
19,795.25
41,400.00 12,420.00
57,850.00 5,785.00
66,100.00 661.00
61,950.00 929.25
65,693.00
650.00 45,500.00
1,337.50 11,128.00
185,000.00 9,065.00

85,488.25
10% 8,548.83
94,037.08

rah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 8PP 91,562.90
19,795.25
41,400.00 12,420.00
57,850.00 5,785.00
66,100.00 661.00
61,950.00 929.25
63,443.75

CK Boyolali
HARGA JUMLAH
N PEKERJAAN BAHAN/UPAH
Rp Rp
ASANGAN DINDING
650.00 45,500.00
1,337.50 8,693.75
185,000.00 9,250.00

83,239.00
10% 8,323.90
91,562.90

rah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 3KP 91,887.40
19,795.25
41,400.00 12,420.00
57,850.00 5,785.00
66,100.00 661.00
61,950.00 929.25
63,738.75
650.00 45,500.00
1,337.50 6,018.75
185,000.00 9,250.00
198,000.00 2,970.00

83,534.00
10% 8,353.40
91,887.40

10, speci camp. 1SP : 3PP 154,232.93


19,795.25
41,400.00 12,420.00
57,850.00 5,785.00
66,100.00 661.00
61,950.00 929.25
120,416.50
2,400.00 30,000.00
1,337.50 20,276.50
185,000.00 67,340.00
10,000.00 2,800.00

140,211.75

CK Boyolali
HARGA JUMLAH
N PEKERJAAN BAHAN/UPAH
Rp Rp
ASANGAN DINDING
10% 14,021.18
154,232.93

10, speci camp. 1SP : 4PP 154,659.04


19,795.25
41,400.00 12,420.00
57,850.00 5,785.00
66,100.00 661.00
61,950.00 929.25
120,803.88
2,400.00 30,000.00
1,337.50 16,223.88
185,000.00 71,780.00
10,000.00 2,800.00

140,599.13
10% 14,059.91
154,659.04

ng (Rooster) Uk, (12x11x24)cm Camp. 1SP : 3PP 243,081.03


19,795.25
41,400.00 12,420.00
57,850.00 5,785.00
66,100.00 661.00
61,950.00 929.25
201,187.50
6,000.00 180,000.00
1,337.50 14,712.50
185,000.00 6,475.00

220,982.75
10% 22,098.28
243,081.03

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

VII A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN


1 A,4,4,2.1 1 m2 Pemasangan Plesteran 1 Pc : 1 Pp Tebal 15 mm
A Tenaga
L.01 0.3 OH Pekerja
L.02 0.15 OH Tukang batu
L.03 0.015 OH Kepala Tukang
L.04 0.015 OH Mandor
B Bahan
15.504 Kg Portland Cement
0.016 m3 Pasir Pasang
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
Overhead & Profit (contoh 10%)
2 A,4,4,2.2 1 m2 Pemasangan Plesteran 1 Pc : 2 Pp Tebal 15 mm
A Tenaga
L.01 0.3 OH Pekerja
L.02 0.15 OH Tukang batu
L.03 0.015 OH Kepala Tukang
L.04 0.015 OH Mandor
B Bahan
10.224 Kg Portland Cement
0.020 m3 Pasir Pasang
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

3 A,4,4,2.3 1 m2 Pemasangan Plesteran 1 Pc : 3 Pp Tebal 15 mm


A Tenaga
L.01 0.3 OH Pekerja
L.02 0.15 OH Tukang batu
L.03 0.015 OH Kepala Tukang
L.04 0.015 OH Mandor
B Bahan
7.776 Kg Portland Cement
0.023 m3 Pasir Pasang
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

4 A,4,4,2.4 1 m2 Pemasangan Plesteran 1 Pc : 4 Pp Tebal 15 mm


A Tenaga
L.01 0.3 OH Pekerja
L.02 0.15 OH Tukang batu
L.03 0.015 OH Kepala Tukang
L.04 0.015 OH Mandor
B Bahan
6.240 Kg Portland Cement
0.024 m3 Pasir Pasang

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

VII A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN


C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

5 A,4,4,2.5 1 m2 Pemasangan Plesteran 1 Pc : 5 Pp Tebal 15 mm


A Tenaga
L.01 0.3 OH Pekerja
L.02 0.15 OH Tukang batu
L.03 0.015 OH Kepala Tukang
L.04 0.015 OH Mandor
B Bahan
5.184 Kg Portland Cement
0.026 m3 Pasir Pasang
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

6 A,4,4,2.6 1 m2 Pemasangan Plesteran 1 Pc : 6 Pp Tebal 15 mm


Tenaga
L.01 0.3 OH Pekerja
L.02 0.15 OH Tukang batu
L.03 0.015 OH Kepala Tukang
L.04 0.015 OH Mandor
Bahan
4.416 Kg Portland Cement
0.027 m3 Pasir Pasang
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

7 A,4,4,2.7 1 m2 Pemasangan Plesteran 1 Pc : 7 Pp Tebal 15 mm


A Tenaga
L.01 0.3 OH Pekerja
L.02 0.15 OH Tukang batu
L.03 0.015 OH Kepala Tukang
L.04 0.015 OH Mandor
B Bahan
3.936 Kg Portland Cement
0.028 m3 Pasir Pasang
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

8 A,4,4,2.8 1 m2 Pemasangan Plesteran 1 Pc : 8 Pp Tebal 15 mm


A Tenaga
L.01 0.30 OH Pekerja
L.02 0.15 OH Tukang batu

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

VII A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN


L.03 0.015 OH Kepala Tukang
L.04 0.015 OH Mandor
B Bahan
3.456 Kg Portland Cement
0.029 m3 Pasir Pasang
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

9 A.4.4.2.9 1 m2 Pemasangan Plesteran 1 Pc : 1/2 Kp : 3 Pp Tebal 15 m


A Tenaga
L.01 0.36 OH Pekerja
L.02 0.12 OH Tukang batu
L.03 0.012 OH Kepala Tukang
L.04 0.018 OH Mandor
B Bahan
5.760 Kg Portland Cement
0.003 m3 Kapur Pasang
0.013 m3 Pasir Pasang
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

10 A,4,4,2.10 1 m2 Pemasangan Plesteran 1 Pc : 2 Kp : 8 Pp Tebal 15 mm


A Tenaga
L.01 0.36 OH Pekerja
L.02 0.12 OH Tukang batu
L.03 0.012 OH Kepala Tukang
L.04 0.018 OH Mandor
B Bahan
3 kg Portland Cement
0.005 m3 Kapur Padam
0.020 m3 Pasir Pasang
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

11 A,4,4,2.13 1 m2 Pemasangan Plesteran 1 Pc : 2 Pp Tebal 20 mm


A Tenaga
L.01 0.40 OH Pekerja
L.02 0.20 OH Tukang batu
L.03 0.020 OH Kepala Tukang
L.04 0.022 OH Mandor
B Bahan
13.632 kg Portland Cement
0.027 m3 Pasir Pasang
C PERALATAN
D Jumlah A + B + C

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

VII A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN


E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

12 A,4,4,2.14 1 m2 Pemasangan Plesteran 1Pc : 3Pp Tebal 20 mm


A Tenaga
L.01 0.40 OH Pekerja
L.02 0.2 OH Tukang batu
L.03 0.02 OH Kepala Tukang
L.04 0.022 OH Mandor
B Bahan
10.368 Kg Portland Cement
0.031 m3 Pasir Pasang
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

13 A,4,4,2.15 1 m2 Pemasangan Plesteran 1 Pc : 4 Pp Tebal 20 mm


A Tenaga
L.01 0.40 OH Pekerja
L.02 0.20 OH Tukang batu
L.03 0.020 OH Kepala Tukang
L.04 0.022 OH Mandor
B Bahan
8.320 kg Portland Cement
0.032 m3 Pasir Pasang
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

14 A,4,4,2.16 1 m2 Pemasangan Plesteran 1Pc : 5Pp Tebal 20 mm


A Tenaga
L.01 0.400 OH Pekerja
L.02 0.200 OH Tukang batu
L.03 0.020 OH Kepala Tukang
L.04 0.022 OH Mandor
B Bahan
6.912 Kg Portland Cement
0.035 m3 Pasir Pasang
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

15 A,4,4,2.17 1 m2 Pemasangan Plesteran 1Pc : 6Pp Tebal 20 mm


A Tenaga
L.01 0.40 OH Pekerja
L.02 0.2 OH Tukang batu
L.03 0.02 OH Kepala Tukang
L.04 0.022 OH Mandor

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

VII A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN


B Bahan
5.888 Kg Portland Cement
0.036 m3 Pasir Pasang
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

16 A,4,4,2.19 1 m2 Pemasangan Berapen 1 Pc : 5Pp Tebal 15 mm


A Tenaga
L.01 0.15 OH Pekerja
L.02 0.075 OH Tukang batu
L.03 0.008 OH Kepala Tukang
L.04 0.008 OH Mandor
B Bahan
5.184 Kg Portland Cement
0.026 m3 Pasir Pasang
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

17 A,4,4,2.20 1 m' Pemasangan Plesteran Skoning 1 Pc : 2Pp, lebar 10 mm


A Tenaga
L.01 0.080 OH Pekerja
L.02 0.40 OH Tukang batu
L.03 0.040 OH Kepala Tukang
L.04 0.004 OH Mandor
B Bahan
0.5 Kg Portland Cement
0.013 m3 Pasir Pasang
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

18 A,4,4,2.23 1 m2 Pemasangan Plesteran Ciprat 1Pc : 2 Pp


Tenaga
L.01 0.30 OH Pekerja
L.02 0.1 OH Tukang batu
L.03 0.01 OH Kepala Tukang
L.04 0.015 OH Mandor
Bahan
4.32 Kg Portland Cement
0.006 m3 Pasir Pasang
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

19 A,4,4,2.24 1 m2 Pemasangan Finishing Siar Pasangan Dinding Bata Me

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

VII A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN


A Tenaga
L.01 0.15 OH Pekerja
L.02 0.075 OH Tukang batu
L.03 0.008 OH Kepala Tukang
L.04 0.008 OH Mandor
B Bahan
3.108 Kg Portland Cement

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

VII A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN


C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

20 A,4,4,2.25 1 m2 Pemasangan Finishing Siar Pasangan Dinding Conbloc


A Tenaga
L.01 0.070 OH Pekerja
L.02 0.035 OH Tukang batu
L.03 0.004 OH Kepala Tukang
L.04 0.004 OH Mandor
B Bahan
1.600 Kg Portland Cement
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

21 A,4,4,2.26 1 m2 Pemasangan Finishing Siar Pas.Batu Kali Adukan 1Pc


Tenaga
L.01 0.3 OH Pekerja
L.02 0.15 OH Tukang batu
L.03 0.015 OH Kepala Tukang
L.04 0.015 OH Mandor
Bahan
6.34 Kg Portland Cement
0.012 m3 Pasir Pasang
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

22 A,4,4,2.27 1 m2 Pemasangan Acian


Tenaga
L.01 0.20 OH Pekerja
L.02 0.10 OH Tukang batu
L.03 0.010 OH Kepala Tukang
L.04 0.010 OH Mandor
Bahan
3.25 Kg Portland Cement
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp

1 Pp Tebal 15 mm 51,386.34
23,018.25
41,400.00 12,420.00
57,850.00 8,677.50
66,100.00 991.50
61,950.00 929.25
23,696.60
1,337.50 20,736.60
185,000.00 2,960.00

46,714.85
10% 4,671.49
51,386.34

2 Pp Tebal 15 mm 44,432.14
23,018.25
41,400.00 12,420.00
57,850.00 8,677.50
66,100.00 991.50
61,950.00 929.25
17,374.60
1,337.50 13,674.60
185,000.00 3,700.00

40,392.85
10% 4,039.29
44,432.14

3 Pp Tebal 15 mm 41,441.02
23,018.25
41,400.00 12,420.00
57,850.00 8,677.50
66,100.00 991.50
61,950.00 929.25
14,655.40
1,337.50 10,400.40
185,000.00 4,255.00

37,673.65
10% 3,767.37
41,441.02

4 Pp Tebal 15 mm 39,384.68
23,018.25
41,400.00 12,420.00
57,850.00 8,677.50
66,100.00 991.50
61,950.00 929.25
12,786.00
1,337.50 8,346.00
185,000.00 4,440.00

CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp

35,804.25
10% 3,580.43
39,384.68

5 Pp Tebal 15 mm 38,238.04
23,018.25
41,400.00 12,420.00
57,850.00 8,677.50
66,100.00 991.50
61,950.00 929.25
11,743.60
1,337.50 6,933.60
185,000.00 4,810.00

34,761.85
10% 3,476.19
38,238.04

6 Pp Tebal 15 mm 37,311.62
23,018.25
41,400.00 12,420.00
57,850.00 8,677.50
66,100.00 991.50
61,950.00 929.25
10,901.40
1,337.50 5,906.40
185,000.00 4,995.00

33,919.65
10% 3,391.97
37,311.62

7 Pp Tebal 15 mm 36,808.92
23,018.25
41,400.00 12,420.00
57,850.00 8,677.50
66,100.00 991.50
61,950.00 929.25
10,444.40
1,337.50 5,264.40
185,000.00 5,180.00

33,462.65
10% 3,346.27
36,808.92

8 Pp Tebal 15 mm 36,306.22
23,018.25
41,400.00 12,420.00
57,850.00 8,677.50

CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp

66,100.00 991.50
61,950.00 929.25
9,987.40
1,337.50 4,622.40
185,000.00 5,365.00

33,005.65
10% 3,300.57
36,306.22

1/2 Kp : 3 Pp Tebal 15 mm 37,903.03


23,754.30
41,400.00 14,904.00
57,850.00 6,942.00
66,100.00 793.20
61,950.00 1,115.10
10,703.00
1,337.50 7,704.00
198,000.00 594.00
185,000.00 2,405.00

34,457.30
10% 3,445.73
37,903.03

2 Kp : 8 Pp Tebal 15 mm 35,702.48
23,754.30
41,400.00 14,904.00
57,850.00 6,942.00
66,100.00 793.20
61,950.00 1,115.10
8,702.50
1,337.50 4,012.50
198,000.00 990.00
185,000.00 3,700.00

32,456.80
10% 3,245.68
35,702.48

2 Pp Tebal 20 mm 59,446.97
30,814.90
41,400.00 16,560.00
57,850.00 11,570.00
66,100.00 1,322.00
61,950.00 1,362.90
23,227.80
1,337.50 18,232.80
185,000.00 4,995.00

54,042.70

CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp

10% 5,404.27
59,446.97

3Pp Tebal 20 mm 55,458.81


30,814.90
41,400.00 16,560.00
57,850.00 11,570.00
66,100.00 1,322.00
61,950.00 1,362.90
19,602.20
1,337.50 13,867.20
185,000.00 5,735.00

50,417.10
10% 5,041.71
55,458.81

4 Pp Tebal 20 mm 52,649.19
30,814.90
41,400.00 16,560.00
57,850.00 11,570.00
66,100.00 1,322.00
61,950.00 1,362.90
17,048.00
1,337.50 11,128.00
185,000.00 5,920.00

47,862.90
10% 4,786.29
52,649.19

5Pp Tebal 20 mm 51,188.17


30,814.90
41,400.00 16,560.00
57,850.00 11,570.00
66,100.00 1,322.00
61,950.00 1,362.90
15,719.80
1,337.50 9,244.80
185,000.00 6,475.00

46,534.70
10% 4,653.47
51,188.17

6Pp Tebal 20 mm 49,885.11


30,814.90
41,400.00 16,560.00
57,850.00 11,570.00
66,100.00 1,322.00
61,950.00 1,362.90

CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp

14,535.20
1,337.50 7,875.20
185,000.00 6,660.00

45,350.10
10% 4,535.01
49,885.11

25,648.43
11,573.15
41,400.00 6,210.00
57,850.00 4,338.75
66,100.00 528.80
61,950.00 495.60
11,743.60
1,337.50 6,933.60
185,000.00 4,810.00

23,316.75
10% 2,331.68
25,648.43

ng 1 Pc : 2Pp, lebar 10 mm 35,659.31


29,343.80
41,400.00 3,312.00
57,850.00 23,140.00
66,100.00 2,644.00
61,950.00 247.80
3,073.75
1,337.50 668.75
185,000.00 2,405.00

32,417.55
10% 3,241.76
35,659.31

29,351.58
19,795.25
41,400.00 12,420.00
57,850.00 5,785.00
66,100.00 661.00
61,950.00 929.25
6,888.00
1,337.50 5,778.00
185,000.00 1,110.00

26,683.25
10% 2,668.33
29,351.58

asangan Dinding Bata Merah (=20 m') 17,303.11

CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp

11,573.15
41,400.00 6,210.00
57,850.00 4,338.75
66,100.00 528.80
61,950.00 495.60
4,156.95
1,337.50 4,156.95

CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp

15,730.10
10% 1,573.01
17,303.11

asangan Dinding Conblock ekspose (=8 m') 8,332.45


5,434.95
41,400.00 2,898.00
57,850.00 2,024.75
66,100.00 264.40
61,950.00 247.80
2,140.00
1,337.50 2,140.00

7,574.95
10% 757.50
8,332.45

as.Batu Kali Adukan 1Pc : 2Pp 37,089.80


23,018.25
41,400.00 12,420.00
57,850.00 8,677.50
66,100.00 991.50
61,950.00 929.25
10,699.75
1,337.50 8,479.75
185,000.00 2,220.00

33,718.00
10% 3,371.80
37,089.80

21,661.61
15,345.50
41,400.00 8,280.00
57,850.00 5,785.00
66,100.00 661.00
61,950.00 619.50
4,346.88
1,337.50 4,346.88

19,692.38
10% 1,969.24
21,661.61

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

VIII A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI dan DIND


1 A.4.4.3.35a 1 m2 Pemasangan Lantai Keramik 30 x 30 cm polos
A Tenaga
L.01 0.70 OH Pekerja
L.02 0.35 OH Tukang Batu
L.03 0.035 OH Kepala Tukang
L.04 0.035 OH Mandor
B Bahan
11.87 Buah Ubin Keramik 30 x 30 cm keramik polos
10.00 Kg Portland Semen
0.045 m3 Pasir Pasang
1.50 Kg Semen Warna
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

2 A.4.4.3.35b 1 m2 Pemasangan Lantai Keramik 40 x 40 cm polos


A Tenaga
L.01 0.70 OH Pekerja
L.02 0.35 OH Tukang Batu
L.03 0.035 OH Kepala Tukang
L.04 0.035 OH Mandor
B Bahan
6.63 Buah Ubin Keramik 40 x 40 cm keramik polos
10.00 Kg Portland Semen
0.045 m3 Pasir Pasang
1.50 Kg Semen Warna
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

3 A.4.4.3.35c 1 m2 Pemasangan Lantai Keramik 40 x 40 cm warna pola


A Tenaga
L.01 0.70 OH Pekerja
L.02 0.35 OH Tukang Batu
L.03 0.035 OH Kepala Tukang
L.04 0.035 OH Mandor
B Bahan
6.63 Buah Ubin Keramik 40 x 40 cm warna pola
10.00 Kg Portland Semen
0.045 m3 Pasir Pasang
1.50 Kg Semen Warna
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

4 A.4.4.3.35d 1 m2 Pemasangan Lantai Keramik Anti Selip 40 x 40


A Tenaga
L.01 0.70 OH Pekerja

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

VIII A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI dan DIND


L.02 0.35 OH Tukang Batu
L.03 0.035 OH Kepala Tukang
L.04 0.035 OH Mandor
B Bahan
6.63 Buah Ubin Lantai Keramik Anti Selip 40 x 40
10.00 Kg Portland Semen
0.045 m3 Pasir Pasang
1.50 Kg Semen Warna
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

5 A.4.4.3.36 1 m2 Pemasangan Lantai Keramik 20 x 20 cm


A Tenaga
L.01 0.70 OH Pekerja
L.02 0.35 OH Tukang Batu
L.03 0.035 OH Kepala Tukang
L.04 0.035 OH Mandor
B Bahan
26.5 Buah Ubin Keramik 20 x 20 cm
10.40 Kg Portland Semen
1.62 Kg Semen Warna
0.045 m3 Pasir Pasang
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

6 A.4.4.3.39 1 m' Pemasangan Plint Keramik Ukuran 10x20 cm


A Tenaga
L.01 0.9 OH Pekerja
L.02 0.09 OH Tukang Batu
L.03 0.009 OH Kepala Tukang
L.04 0.005 OH Mandor

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

VIII A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI dan DIND


B Bahan
5.3 Buah Ubin Keramik
1.14 Kg Portland Semen
0.003 m3 Pasir Pasang
0.025 Kg Semen Warna
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

7 A.4.4.3.39a 1 m' Pemasangan Lis Keramik 5x20 cm


A Tenaga
L.01 0.9 OH Pekerja
L.02 0.09 OH Tukang Batu
L.03 0.009 OH Kepala Tukang
L.04 0.005 OH Mandor
B Bahan
5.3 Buah Lis Keramik 5x20 cm
0.57 Kg Portland Semen
0.0015 m3 Pasir Pasang
0.013 Kg Semen Warna
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

8 A.4.4.3.44 1 m2 Pemasangan Lantai Karpet


A Tenaga
L.01 0.17 OH Pekerja
L.02 0.17 OH Tukang Batu
L.03 0.017 OH Kepala Tukang
L.04 0.009 OH Mandor
B Bahan
1.05 m2 Karpet
0.35 kg Lem
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

9 A.4.4.3.54 1 m2 Pemasangan Dinding Keramik 20x20 cm,


A Tenaga
L.01 0.900 OH Pekerja
L.02 0.450 OH Tukang Batu
L.03 0.045 OH Kepala Tukang
L.04 0.045 OH Mandor
B Bahan
1.060 m2 Keramik
9.300 Kg Portland Semen
0.018 m3 Pasir Pasang
1.940 Kg Semen Warna

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

VIII A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI dan DIND


C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

10 A.4.4.3.54a 1 m2 Pemasangan Dinding Keramik 20x25 cm,


A Tenaga
L.01 0.90 OH Pekerja
L.02 0.45 OH Tukang Batu
L.03 0.05 OH Kepala Tukang
L.04 0.05 OH Mandor
B Bahan
1.06 m2 Keramik
9.30 Kg Portland Semen
0.02 m3 Pasir Pasang
1.94 Kg Semen Warna
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

11 A.4.4.3.58a 1 m2 Pemasangan Dinding Batu Candi


A Tenaga
L.01 0.70 OH Pekerja
L.02 0.35 OH Tukang Batu
L.03 0.035 OH Kepala Tukang
L.04 0.035 OH Mandor
B Bahan
1.10 m2 Batu Candi
11.75 Kg Portland Semen
0.035 m3 Pasir Pasang
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

VIII A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI dan DIND


12 A.4.4.3.58b 1 m2 Pemasangan Dinding Batu Andesit
A Tenaga
L.01 0.70 OH Pekerja
L.02 0.35 OH Tukang Batu
L.03 0.035 OH Kepala Tukang
L.04 0.035 OH Mandor
B Bahan
1.10 m2 Batu Andesit
11.75 Kg Portland Semen
0.035 m3 Pasir Pasang
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

13 A.4.4.3.58c 1 m2 Pemasangan Dinding Batu Andesit Alur


A Tenaga
L.01 0.70 OH Pekerja
L.02 0.35 OH Tukang Batu
L.03 0.035 OH Kepala Tukang
L.04 0.035 OH Mandor
B Bahan
1.10 m2 Batu Andesit
11.75 Kg Portland Semen
0.035 m3 Pasir Pasang
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

14 A.4.4.3.63b 1 m' Pemasangan Plint Kayu Jati kelas III (lebar 10 cm tebal 2 c
Tenaga
L.01 0.12 OH Pekerja
L.02 0.12 OH Tukang Batu
L.03 0.012 OH Kepala Tukang
L.04 0.006 OH Mandor
Bahan
0.003 m3 Papan Kayu jati Klas III
0.05 kg Paku Sekrup 5 cm

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

15 A.4.4.3.64 1 m2 Pas. Paving abu-abu tebal 6 cm


Tenaga
L.01 0.24 Oh Pekerja
L.02 0.08 Oh Tukang Batu
L.03 0.008 Oh Kepala Tukang
L.04 0.12 Oh Mandor

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

VIII A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI dan DIND


Bahan
1.05 m2 Paving abu-abu 6 cm
0.012 m3 Pasir urug

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

16 A.4.4.3.65 1 m2 Pas. Paving abu-abu tebal 8 cm


Tenaga
L.01 0.24 Oh Pekerja
L.02 0.08 Oh Tukang Batu
L.03 0.008 Oh Kepala Tukang
L.04 0.12 Oh Mandor
Bahan
1.05 m2 Paving abu-abu 8 cm
0.012 m3 Pasir urug
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

17 A.4.4.3.66 1 m2 Pas. Paving abu-abu K.250 tebal 6 cm


Tenaga
L.01 0.24 Oh Pekerja
L.02 0.08 Oh Tukang Batu
L.03 0.008 Oh Kepala Tukang
L.04 0.12 Oh Mandor
Bahan
1.05 m2 Paving abu-abu K.250 tebal 6 cm
0.012 m3 Pasir urug

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

VIII A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI dan DIND


18 A.4.4.3.67 1 m2 Pas. Paving abu-abu K.250 tebal 8 cm
Tenaga
L.01 0.24 Oh Pekerja
L.02 0.08 Oh Tukang Batu
L.03 0.008 Oh Kepala Tukang
L.04 0.12 Oh Mandor
Bahan
1.05 m2 Paving abu-abu K.250 tebal 8 cm
0.012 m3 Pasir urug

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

19 A.4.4.3.69 1 m2 Pas. Paving abu-abu K.300 tebal 6 cm


Tenaga
L.01 0.24 Oh Pekerja
L.02 0.08 Oh Tukang Batu
L.03 0.008 Oh Kepala Tukang
L.04 0.12 Oh Mandor
Bahan
1.05 m2 Paving abu-abu K.300 tebal 6 cm
0.012 m3 Pasir urug

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

20 A.4.4.3.70 1 m2 Pas. Paving abu-abu K.300 tebal 8 cm


Tenaga
L.01 0.24 Oh Pekerja
L.02 0.08 Oh Tukang Batu
L.03 0.008 Oh Kepala Tukang
L.04 0.12 Oh Mandor
Bahan
1.05 m2 Paving abu-abu K.300 tebal 8 cm
0.012 m3 Pasir urug

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

7. Memasang 1 m² lantai ubin granit ukuran ( 60 x 60 ) cm

Upah
0.25 Oh Pekerja
0.125 Oh Tukang batu

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

VIII A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI dan DIND


0.013 Oh Kepala Tukang
0.013 Oh Mandor

Bahan
3.1 bh Ubin granit 60x60 cm
9.8 kg Portland Cement
0.045 m³ Pasir pasang
1.3 kg Semen warna

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
PENUTUP LANTAI dan DINDING
139,260.93
53,709.25
41,400.00 28,980.00
57,850.00 20,247.50
66,100.00 2,313.50
61,950.00 2,168.25
72,891.59
4,090.91 48,559.09
1,337.50 13,375.00
185,000.00 8,325.00
1,755.00 2,632.50

126,600.84
10% 12,660.08
139,260.93

144,189.93
53,709.25
41,400.00 28,980.00
57,850.00 20,247.50
66,100.00 2,313.50
61,950.00 2,168.25
77,372.50
8,000.00 53,040.00
1,337.50 13,375.00
185,000.00 8,325.00
1,755.00 2,632.50

131,081.75
10% 13,108.18
144,189.93

40 x 40 cm warna pola 157,560.43


53,709.25
41,400.00 28,980.00
57,850.00 20,247.50
66,100.00 2,313.50
61,950.00 2,168.25
89,527.50
9,833.33 65,195.00
1,337.50 13,375.00
185,000.00 8,325.00
1,755.00 2,632.50

143,236.75
10% 14,323.68
157,560.43

Anti Selip 40 x 40 158,775.93


53,709.25
41,400.00 28,980.00

CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
PENUTUP LANTAI dan DINDING
57,850.00 20,247.50
66,100.00 2,313.50
61,950.00 2,168.25
90,632.50
10,000.00 66,300.00
1,337.50 13,375.00
185,000.00 8,325.00
1,755.00 2,632.50

144,341.75
10% 14,434.18
158,775.93

135,754.69
53,709.25
41,400.00 28,980.00
57,850.00 20,247.50
66,100.00 2,313.50
61,950.00 2,168.25
69,704.10
1,684.00 44,626.00
1,337.50 13,910.00
1,755.00 2,843.10
185,000.00 8,325.00

123,413.35
10% 12,341.34
135,754.69

67,534.25
43,371.15
41,400.00 37,260.00
57,850.00 5,206.50
66,100.00 594.90
61,950.00 309.75

CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
PENUTUP LANTAI dan DINDING
18,023.63
3,000.00 15,900.00
1,337.50 1,524.75
185,000.00 555.00
1,755.00 43.88

61,394.78
10% 6,139.48
67,534.25

72,197.22
43,371.15
41,400.00 37,260.00
57,850.00 5,206.50
66,100.00 594.90
61,950.00 309.75
22,262.69
4,000.00 21,200.00
1,337.50 762.38
185,000.00 277.50
1,755.00 22.82

65,633.84
10% 6,563.38
72,197.22

153,503.63
18,553.75
41,400.00 7,038.00
57,850.00 9,834.50
66,100.00 1,123.70
61,950.00 557.55
120,995.00
110,000.00 115,500.00
15,700.00 5,495.00

139,548.75
10% 13,954.88
153,503.63

149,054.62
69,054.75
41,400.00 37,260.00
57,850.00 26,032.50
66,100.00 2,974.50
61,950.00 2,787.75
66,449.45
44,600.00 47,276.00
1,337.50 12,438.75
185,000.00 3,330.00
1,755.00 3,404.70

CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
PENUTUP LANTAI dan DINDING

135,504.20
10% 13,550.42
149,054.62

149,054.62
69,054.75
41,400.00 37,260.00
57,850.00 26,032.50
66,100.00 2,974.50
61,950.00 2,787.75
66,449.45
m2 44,600.00 47,276.00
Kg 1,337.50 12,438.75
m3 185,000.00 3,330.00
Kg 1,755.00 3,404.70

135,504.20
10% 13,550.42
149,054.62

203,400.86
53,709.25
41,400.00 28,980.00
57,850.00 20,247.50
66,100.00 2,313.50
61,950.00 2,168.25
131,200.63
99,100.00 109,010.00
1,337.50 15,715.63
185,000.00 6,475.00

184,909.88
10% 18,490.99
203,400.86

CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
PENUTUP LANTAI dan DINDING
264,989.86
53,709.25
41,400.00 28,980.00
57,850.00 20,247.50
66,100.00 2,313.50
61,950.00 2,168.25
187,190.63
150,000.00 165,000.00
1,337.50 15,715.63
185,000.00 6,475.00

240,899.88
10% 24,089.99
264,989.86

289,189.86
53,709.25
41,400.00 28,980.00
57,850.00 20,247.50
66,100.00 2,313.50
61,950.00 2,168.25
209,190.63
170,000.00 187,000.00
1,337.50 15,715.63
185,000.00 6,475.00

262,899.88
10% 26,289.99
289,189.86

elas III (lebar 10 cm tebal 2 cm) 56,614.03


13,074.90
41,400.00 4,968.00
57,850.00 6,942.00
66,100.00 793.20
61,950.00 371.70
38,392.40
12,495,800.00 37,487.40
18,100.00 905.00

51,467.30
10% 5,146.73
56,614.03

69,015.98
22,526.80
41,400.00 9,936.00
57,850.00 4,628.00
66,100.00 528.80
61,950.00 7,434.00

CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
PENUTUP LANTAI dan DINDING
40,215.00
37,100.00 38,955.00
105,000.00 1,260.00

62,741.80
10% 6,274.18
69,015.98

83,337.98
22,526.80
41,400.00 9,936.00
57,850.00 4,628.00
66,100.00 528.80
61,950.00 7,434.00
53,235.00
49,500.00 51,975.00
105,000.00 1,260.00

75,761.80
10% 7,576.18
83,337.98

95,465.48
22,526.80
41,400.00 9,936.00
57,850.00 4,628.00
66,100.00 528.80
61,950.00 7,434.00
64,260.00
60,000.00 63,000.00
105,000.00 1,260.00

86,786.80
10% 8,678.68
95,465.48

CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
PENUTUP LANTAI dan DINDING
124,917.98
22,526.80
41,400.00 9,936.00
57,850.00 4,628.00
66,100.00 528.80
61,950.00 7,434.00
91,035.00
85,500.00 89,775.00
105,000.00 1,260.00

113,561.80
10% 11,356.18
124,917.98

101,240.48
22,526.80
41,400.00 9,936.00
57,850.00 4,628.00
66,100.00 528.80
61,950.00 7,434.00
69,510.00
65,000.00 68,250.00
105,000.00 1,260.00

92,036.80
10% 9,203.68
101,240.48

130,692.98
22,526.80
41,400.00 9,936.00
57,850.00 4,628.00
66,100.00 528.80
61,950.00 7,434.00
96,285.00
90,500.00 95,025.00
105,000.00 1,260.00

118,811.80
10% 11,881.18
130,692.98

19,245.90
@ 41,400.00 10,350.00
@ 57,850.00 7,231.25

CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
PENUTUP LANTAI dan DINDING
@ 66,100.00 859.30
@ 61,950.00 805.35

288,107.50
@ 88,709.68 275,000.00
@ 1,337.50 13,107.50
@ 185,000.00 8,325.00
@ 1,755.00 2,281.50

307,353.40
10% 30,735.34
338,088.74

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

IX A.4.5.1 HARGA SATUAN PEKERJAAN LANGIT-LANGIT


1 A.4.5.1.1 1 m2 Pemasangan Langit-langit GRC (1,00x1,00) m
A Tenaga
L.01 0.03 OH Pekerja
L.02 0.07 OH Tukang Kayu
L.03 0.007 OH Kepala Tukang
L.04 0.004 OH Mandor
B Bahan
1.1 Lbr Plat GRC
0.01 Kg Paku
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

2 A.4.5.1.5a 1 m2 Memasang Langit-langit Tripleks Uk (120x240) cm


A Tenaga
L.01 0.10 OH Pekerja
L.02 0.10 OH Tukang Kayu
L.03 0.01 OH Kepala Tukang
L.04 0.005 OH Mandor
B Bahan
0.375 Lbr Tripleks (4 mm)
0.03 Kg Paku Tripleks
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

3 A.4.5.1.5b 1 m2 Memasang Langit-langit Tripleks Uk (120x240) cm


A Tenaga
L.01 0.10 OH Pekerja
L.02 0.10 OH Tukang Kayu
L.03 0.01 OH Kepala Tukang
L.04 0.005 OH Mandor
B Bahan
0.375 Lbr Tripleks (3 mm)
0.03 Kg Paku Tripleks
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

4 A.4.5.1.6a 1 m2 Memasang Langit-langit Lambriziring Kayu Jati Kel

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

IX A.4.5.1 HARGA SATUAN PEKERJAAN LANGIT-LANGIT


A Tenaga
L.01 0.8 OH Pekerja
L.02 0.8 OH Tukang Kayu
L.03 0.08 OH Kepala Tukang
L.04 0.04 OH Mandor
B Bahan
0.015 m3 Kayu Jati kelas II, Papan
0.01 Kg Paku
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

5 A.4.5.1.6b 1 m2 Memasang Langit-langit Lambriziring Kayu Jati Kel


A Tenaga
L.01 0.8 OH Pekerja
L.02 0.8 OH Tukang Kayu
L.03 0.08 OH Kepala Tukang
L.04 0.04 OH Mandor
B Bahan
0.015 m3 Kayu Jati Kelas III, Papan
0.01 Kg Paku
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

6 A.4.5.1.6c 1 m2 Memasang Langit-langit Lambriziring Kayu Bengkir


A Tenaga
L.01 0.8 OH Pekerja
L.02 0.8 OH Tukang Kayu
L.03 0.08 OH Kepala Tukang
L.04 0.04 OH Mandor
B Bahan
0.015 m3 Kayu Bengkirai, Papan
0.01 Kg Paku
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

7 A.4.5.1.6d 1 m2 Memasang Langit-langit Lambriziring Kayu Kamfer


A Tenaga

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

IX A.4.5.1 HARGA SATUAN PEKERJAAN LANGIT-LANGIT


L.01 0.8 OH Pekerja
L.02 0.8 OH Tukang Kayu
L.03 0.08 OH Kepala Tukang
L.04 0.04 OH Mandor
B Bahan
0.015 m3 Kayu Kamfer, Papan
0.01 Kg Paku
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

8 A.4.5.1.6e 1 m2 Memasang Langit-langit Lambriziring Kayu Kruing,


A Tenaga
L.01 0.8 OH Pekerja
L.02 0.8 OH Tukang Kayu
L.03 0.08 OH Kepala Tukang
L.04 0.04 OH Mandor
B Bahan
0.015 m3 Kayu Kruing, Papan
0.01 Kg Paku
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

9 A.4.5.1.7 1 m2 Memasang Langit-langit Gypsum Board, Uk (120x24


A Tenaga
L.01 0.1 OH Pekerja
L.02 0.05 OH Tukang Kayu
L.03 0.005 OH Kepala Tukang
L.04 0.005 OH Mandor
B Bahan
0.364 Lbr Gypsum Board
0.11 Kg Paku Sekrup
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

10 A.4.5.1.8 1 m1 List Langit-Langit Kayu Profil


A Tenaga
L.01 0.05 OH Pekerja

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

IX A.4.5.1 HARGA SATUAN PEKERJAAN LANGIT-LANGIT


L.02 0.05 OH Tukang Kayu
L.03 0.005 OH Kepala Tukang
L.04 0.003 OH Mandor
B Bahan
1.05 m1 List Kayu Profil
0.01 Kg Paku
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

CK Boyolali
HARGA JUMLAH
URAIAN PEKERJAAN BAHAN/UPAH
Rp Rp

A SATUAN PEKERJAAN LANGIT-LANGIT


sangan Langit-langit GRC (1,00x1,00) m 28,004.90
6,289.00
41,400.00 1,242.00
61,950.00 4,336.50
66,100.00 462.70
61,950.00 247.80
19,170.00
17,300.00 19,030.00
14,000.00 140.00

25,459.00
10% 2,545.90
Satuan Pekerjaan (D+E) 28,004.90

sang Langit-langit Tripleks Uk (120x240) cm, Tebal 4 mm 38,803.33


11,305.75
41,400.00 4,140.00
61,950.00 6,195.00
66,100.00 661.00
61,950.00 309.75
23,970.00
62,800.00 23,550.00
14,000.00 420.00

35,275.75
10% 3,527.58
Satuan Pekerjaan (D+E) 38,803.33

sang Langit-langit Tripleks Uk (120x240) cm, Tebal 3 mm 34,678.33


11,305.75
41,400.00 4,140.00
61,950.00 6,195.00
66,100.00 661.00
61,950.00 309.75
20,220.00
52,800.00 19,800.00
14,000.00 420.00

31,525.75
10% 3,152.58
Satuan Pekerjaan (D+E) 34,678.33

sang Langit-langit Lambriziring Kayu Jati Kelas II, tebal 9 mm 340,189.85

CK Boyolali
HARGA JUMLAH
URAIAN PEKERJAAN BAHAN/UPAH
Rp Rp

A SATUAN PEKERJAAN LANGIT-LANGIT


90,446.00
41,400.00 33,120.00
61,950.00 49,560.00
66,100.00 5,288.00
61,950.00 2,478.00
218,817.50
14,578,500.00 218,677.50
14,000.00 140.00

309,263.50
10% 30,926.35
Satuan Pekerjaan (D+E) 340,189.85

sang Langit-langit Lambriziring Kayu Jati Kelas III, tebal 9 mm 305,825.30


90,446.00
41,400.00 33,120.00
61,950.00 49,560.00
66,100.00 5,288.00
61,950.00 2,478.00
187,577.00
ati Kelas III, Papan 12,495,800.00 187,437.00
14,000.00 140.00

278,023.00
10% 27,802.30
Satuan Pekerjaan (D+E) 305,825.30

sang Langit-langit Lambriziring Kayu Bengkirai, tebal 9 mm 269,594.60


90,446.00
41,400.00 33,120.00
61,950.00 49,560.00
66,100.00 5,288.00
61,950.00 2,478.00
154,640.00
10,300,000.00 154,500.00
14,000.00 140.00

245,086.00
10% 24,508.60
Satuan Pekerjaan (D+E) 269,594.60

sang Langit-langit Lambriziring Kayu Kamfer, tebal 9 mm 224,415.95


90,446.00

CK Boyolali
HARGA JUMLAH
URAIAN PEKERJAAN BAHAN/UPAH
Rp Rp

A SATUAN PEKERJAAN LANGIT-LANGIT


41,400.00 33,120.00
61,950.00 49,560.00
66,100.00 5,288.00
61,950.00 2,478.00
113,568.50
7,561,900.00 113,428.50
14,000.00 140.00

204,014.50
10% 20,401.45
Satuan Pekerjaan (D+E) 224,415.95

sang Langit-langit Lambriziring Kayu Kruing, tebal 9 mm 195,344.60


90,446.00
41,400.00 33,120.00
61,950.00 49,560.00
66,100.00 5,288.00
61,950.00 2,478.00
87,140.00
5,800,000.00 87,000.00
14,000.00 140.00

177,586.00
10% 17,758.60
Satuan Pekerjaan (D+E) 195,344.60

sang Langit-langit Gypsum Board, Uk (120x240) tebal 9 mm 34,879.63


7,877.75
41,400.00 4,140.00
61,950.00 3,097.50
66,100.00 330.50
61,950.00 309.75
23,831.00
60,000.00 21,840.00
18,100.00 1,991.00

31,708.75
10% 3,170.88
Satuan Pekerjaan (D+E) 34,879.63

angit-Langit Kayu Profil 14,029.24


5,683.85
41,400.00 2,070.00

CK Boyolali
HARGA JUMLAH
URAIAN PEKERJAAN BAHAN/UPAH
Rp Rp

A SATUAN PEKERJAAN LANGIT-LANGIT


61,950.00 3,097.50
66,100.00 330.50
61,950.00 185.85
7,070.00
6,600.00 6,930.00
14,000.00 140.00

12,753.85
10% 1,275.39
Satuan Pekerjaan (D+E) 14,029.24

CK Boyolali
jati papan kelas II

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

X A.4.5.2 HARGA SATUAN PEKERJAAN PENUTUP ATAP


1 A.4.5.2.1a 1 m2 Pemasangan Atap Genteng Soka Kebumen
A Tenaga
L.01 0.15 OH Pekerja
L.02 0.075 OH Tukang Kayu
L.03 0.0075 OH Kepala Tukang
L.04 0.008 OH Mandor
B Bahan
18 Buah Genteng Soka Kebumen Plentong
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

2 A.4.5.2.1b 1 m2 Pemasangan Atap Genteng Press Mantili Mojolaban


A Tenaga
L.01 0.15 OH Pekerja
L.02 0.075 OH Tukang Kayu
L.03 0.0075 OH Kepala Tukang
L.04 0.008 OH Mandor
B Bahan
20 Buah Genteng Press Mantili Mojolaban
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

3 A.4.5.2.1c 1 m2 Pemasangan Atap Genteng Beton


A Tenaga
L.01 0.2 OH Pekerja
L.02 0.1 OH Tukang Kayu
L.03 0.01 OH Kepala Tukang
L.04 0.01 OH Mandor
B Bahan
11 Lbr Genteng Beton Standrad
0.03 Kg Paku Biasa 2" - 5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

3 A.4.5.2.4a 1 m' Pemasangan Genteng Bubung Soka Kebumen


A Tenaga
L.01 0.4 OH Pekerja
L.02 0.2 OH Tukang Kayu
L.03 0.02 OH Kepala Tukang
L.04 0.002 OH Mandor
B Bahan
5 Buah Genteng Bubung Soka Kebumen
8 Kg Portland Semen
0.032 m3 Pasir Pasang

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

X A.4.5.2 HARGA SATUAN PEKERJAAN PENUTUP ATAP


C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

4 A.4.5.2.4b 1 m' Pemasangan Genteng Bubung Mantili Mojolaban


A Tenaga
L.01 0.4 OH Pekerja
L.02 0.2 OH Tukang Kayu
L.03 0.02 OH Kepala Tukang
L.04 0.002 OH Mandor
B Bahan
5 Buah Genteng Bubung Mantili Mojolaban
8 Kg Portland Semen
0.032 m3 Pasir Pasang
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

10 A.4.5.2.4c 1 m' Pemasangan Nok Genteng Beton


A Tenaga
L.01 0.4 OH Pekerja
L.02 0.2 OH Tukang Kayu
L.03 0.02 OH Kepala Tukang
L.04 0.02 OH Mandor
B Bahan
3.5 Buah Nok Genteng Beton
0.05 Kg Paku Biasa 2" - 5"
10.8 Kg Portland Semen
0.032 m3 Pasir Pasang
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

X A.4.5.2 HARGA SATUAN PEKERJAAN PENUTUP ATAP


11 A.4.5.2.38 1 m2 Pemasangan Atap Seng Galvalum
A Tenaga
L.01 0.12 OH Pekerja
L.02 0.06 OH Tukang Kayu
L.03 0.006 OH Kepala Tukang
L.04 0.006 OH Mandor
B Bahan
1.2 Lbr Seng Galvalum
0.02 Kg Paku Biasa 1/2" - 1"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

12 A.4.5.2.39 1 m' Pemasangan Atap Nok galvalum


A Tenaga
L.01 0.15 OH Pekerja
L.02 0.07 OH Tukang Kayu
L.03 0.007 OH Kepala Tukang
L.04 0.006 OH Mandor
B Bahan
0.3 Lbr Seng galvalum
0.04 Kg Paku Biasa 1/2" - 1"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

5 A.4.5.2.43 1 m2 Pemasangan Atap Asbes Gelombang (2,25x0,92 m) x 5 m


A Tenaga
L.01 0.14 OH Pekerja
L.02 0.075 OH Tukang Kayu
L.03 0.008 OH Kepala Tukang
L.04 0.008 OH Mandor
B Bahan
0.6 Lbr Asbes Gelombang
0.12 Kg Paku Pancing 60 x 230
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

6 A.4.5.2.44 1 m2 Pemasangan Atap Asbes Gelombang (2,00x0,92 m) x 5 m


A Tenaga
L.01 0.14 OH Pekerja
L.02 0.07 OH Tukang Kayu
L.03 0.007 OH Kepala Tukang
L.04 0.007 OH Mandor
B Bahan
0.6 Lbr Asbes Gelombang

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

X A.4.5.2 HARGA SATUAN PEKERJAAN PENUTUP ATAP


0.12 Kg Paku Pancing 60 x 230
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

7 A.4.5.2.45 1 m2 Pemasangan Atap Asbes Gelombang (3,00x1,05 m) x 4 m


A Tenaga
L.01 0.14 OH Pekerja
L.02 0.07 OH Tukang Kayu
L.03 0.007 OH Kepala Tukang
L.04 0.007 OH Mandor
B Bahan
0.35 Lbr Asbes Gelombang
0.12 Kg Paku Pancing 60 x 230
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

8 A.4.5.2.46 1 m2 Pemasangan Atap Asbes Gelombang (2,10x1,05 m) x 4 m


A Tenaga
L.01 0.14 OH Pekerja
L.02 0.070 OH Tukang Kayu
L.03 0.007 OH Kepala Tukang
L.04 0.007 OH Mandor
B Bahan
0.51 Lbr Asbes Gelombang
0.12 Kg Paku Pancing 60 x 230
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp

PENUTUP ATAP
62,532.36
11,847.60
41,400.00 6,210.00
61,950.00 4,646.25
66,100.00 495.75
61,950.00 495.60
45,000.00
2,500.00 45,000.00

56,847.60
10% 5,684.76
62,532.36

ess Mantili Mojolaban 55,932.36


11,847.60
41,400.00 6,210.00
61,950.00 4,646.25
66,100.00 495.75
61,950.00 495.60
39,000.00
1,950.00 39,000.00

50,847.60
10% 5,084.76
55,932.36

46,833.05
15,755.50
41,400.00 8,280.00
61,950.00 6,195.00
66,100.00 661.00
61,950.00 619.50
26,820.00
2,400.00 26,400.00
14,000.00 420.00

42,575.50
10% 4,257.55
46,833.05

83,067.49
30,395.90
41,400.00 16,560.00
61,950.00 12,390.00
66,100.00 1,322.00
61,950.00 123.90
45,120.00
5,700.00 28,500.00
1,337.50 10,700.00
185,000.00 5,920.00

CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp

PENUTUP ATAP

75,515.90
10% 7,551.59
83,067.49

Mantili Mojolaban 83,067.49


30,395.90
41,400.00 16,560.00
61,950.00 12,390.00
66,100.00 1,322.00
61,950.00 123.90
45,120.00
5,700.00 28,500.00
1,337.50 10,700.00
185,000.00 5,920.00

75,515.90
10% 7,551.59
83,067.49

76,698.60
31,511.00
41,400.00 16,560.00
61,950.00 12,390.00
66,100.00 1,322.00
61,950.00 1,239.00
38,215.00
4,900.00 17,150.00
14,000.00 700.00
1,337.50 14,445.00
185,000.00 5,920.00

69,726.00
10% 6,972.60
76,698.60

CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp

PENUTUP ATAP
77,234.63
9,453.30
41,400.00 4,968.00
61,950.00 3,717.00
66,100.00 396.60
61,950.00 371.70
60,760.00
50,400.00 60,480.00
14,000.00 280.00

70,213.30
10% 7,021.33
77,234.63

27,984.99
11,380.90
41,400.00 6,210.00
61,950.00 4,336.50
66,100.00 462.70
61,950.00 371.70
14,060.00
45,000.00 13,500.00
14,000.00 560.00

25,440.90
10% 2,544.09
27,984.99

mbang (2,25x0,92 m) x 5 mm 57,559.32


11,466.65
41,400.00 5,796.00
61,950.00 4,646.25
66,100.00 528.80
61,950.00 495.60
40,860.00
65,000.00 39,000.00
15,500.00 1,860.00

52,326.65
10% 5,232.67
57,559.32

mbang (2,00x0,92 m) x 5 mm 52,259.74


11,028.85
41,400.00 5,796.00
61,950.00 4,336.50
66,100.00 462.70
61,950.00 433.65
36,480.00
57,700.00 34,620.00

CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp

PENUTUP ATAP
15,500.00 1,860.00

47,508.85
10% 4,750.89
52,259.74

mbang (3,00x1,05 m) x 4 mm 43,437.74


11,028.85
41,400.00 5,796.00
61,950.00 4,336.50
66,100.00 462.70
61,950.00 433.65
28,460.00
76,000.00 26,600.00
15,500.00 1,860.00

39,488.85
10% 3,948.89
43,437.74

mbang (2,10x1,05 m) x 4 mm 43,349.74


11,028.85
41,400.00 5,796.00
61,950.00 4,336.50
66,100.00 462.70
61,950.00 433.65
28,380.00
52,000.00 26,520.00
15,500.00 1,860.00

39,408.85
10% 3,940.89
43,349.74

CK Boyolali
3/25/2014
5/13/2014
11/9/2014

59,090.90

52,454.54

CK Boyolali
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

XI A.4.6.1 HARGA SATUAN PEKERJAAN K A Y U


1 A.4.6.1.2a 1 m3 Pembuatan & Pemasangan Kosen Pintu & Jendela K
Tenaga
L.01 6.00 OH Pekerja
L.02 18.00 OH Tukang Kayu
L.03 1.80 OH Kepala Tukang
L.04 0.30 OH Mandor
Bahan
1.2 m3 Kayu Jati Kelas II, Balok
1.25 kg Paku Biasa 2" - 5 "
1 kg Lem Kayu
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

2 A.4.6.1.2b 1 m3 Pembuatan & Pemasangan Kosen Pintu & Jendela K


Tenaga
L.01 6.00 OH Pekerja
L.02 18.00 OH Tukang Kayu
L.03 1.80 OH Kepala Tukang
L.04 0.30 OH Mandor
Bahan
1.2 m3 Kayu Jati Kelas III, Balok
1.25 kg Paku Biasa 2" - 5 "
1 kg Lem Kayu
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

3 A.4.6.1.2c 1 m3 Pembuatan & Pemasangan Kosen Pintu & Jendela K


Tenaga
L.01 6.00 OH Pekerja
L.02 18.00 OH Tukang Kayu
L.03 1.80 OH Kepala Tukang
L.04 0.30 OH Mandor
Bahan
1.2 m3 Kayu Bengkirai, Balok
1.25 kg Paku Biasa 2" - 5 "
1 kg Lem Kayu
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

4 A.4.6.1.2d 1 m3 Pembuatan & Pemasangan Kosen Pintu & Jendela K


Tenaga
L.01 6.00 OH Pekerja
L.02 18.00 OH Tukang Kayu
L.03 1.80 OH Kepala Tukang
L.04 0.30 OH Mandor

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

XI A.4.6.1 HARGA SATUAN PEKERJAAN K A Y U


Bahan
1.2 m3 Kayu Kamfer, Balok
1.25 kg Paku Biasa 2" - 5 "
1 kg Lem Kayu
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

5 A.4.6.1.2e 1 m3 Pembuatan & Pemasangan Kosen Pintu & Jendela K


Tenaga
L.01 6.00 OH Pekerja
L.02 18.00 OH Tukang Kayu
L.03 1.80 OH Kepala Tukang
L.04 0.30 OH Mandor
Bahan
1.2 m3 Kayu Kruing, Balok
1.25 kg Paku Biasa 2" - 5 "
1 kg Lem Kayu
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

6 A.4.6.1.4a 1 m2 Pembuatan & Pemasangan Pintu Klamp Standard K


A Tenaga
L.01 0.35 OH Pekerja
L.02 1.05 OH Tukang Kayu
L.03 0.105 OH Kepala Tukang
L.04 0.018 OH Mandor
B Bahan
0.040 m3 Kayu Jati Kelas II, papan
0.05 Kg Paku Biasa 2" - 5 "
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

7 A.4.6.1.4b 1 m2 Pembuatan & Pemasangan Pintu Klamp Standard K


A Tenaga
L.01 0.35 OH Pekerja
L.02 1.05 OH Tukang Kayu
L.03 0.105 OH Kepala Tukang
L.04 0.018 OH Mandor
B Bahan
0.040 m3 Kayu Jati Kelas III, papan
0.05 Kg Paku Biasa 2" - 5 "
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

XI A.4.6.1 HARGA SATUAN PEKERJAAN K A Y U

8 A.4.6.1.4c 1 m2 Pembuatan & Pemasangan Pintu Klamp Standard K


A Tenaga
L.01 0.35 OH Pekerja
L.02 1.05 OH Tukang Kayu
L.03 0.105 OH Kepala Tukang
L.04 0.018 OH Mandor
B Bahan
0.040 m3 Kayu Bengkirai, papan
0.05 Kg Paku Biasa 2" - 5 "
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

9 A.4.6.1.4d 1 m2 Pembuatan & Pemasangan Pintu Klamp Standard K


A Tenaga
L.01 0.35 OH Pekerja
L.02 1.05 OH Tukang Kayu
L.03 0.105 OH Kepala Tukang
L.04 0.018 OH Mandor
B Bahan
0.040 m3 Kayu Kamfer, papan
0.05 Kg Paku Biasa 2" - 5 "
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

10 A.4.6.1.4e 1 m2 Pembuatan & Pemasangan Pintu Klamp Standard K


A Tenaga
L.01 0.35 OH Pekerja
L.02 1.05 OH Tukang Kayu
L.03 0.105 OH Kepala Tukang
L.04 0.018 OH Mandor
B Bahan
0.040 m3 Kayu Kruing, papan
0.05 Kg Paku Biasa 2" - 5 "
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

11 A.4.6.1.5a 1 m2 Pembuatan & Pemasangan Daun Pintu Panel, Kayu


A Tenaga
L.01 1.00 OH Pekerja
L.02 3.00 OH Tukang Kayu
L.03 0.30 OH Kepala Tukang
L.04 0.05 OH Mandor
B Bahan
0.04 m3 Kayu Jati Kelas II, papan

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

XI A.4.6.1 HARGA SATUAN PEKERJAAN K A Y U


0.500 kg Lem Kayu
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

12 A.4.6.1.5b 1 m2 Pembuatan & Pemasangan Daun Pintu Panel, Kayu


A Tenaga
L.01 1.00 OH Pekerja
L.02 3.00 OH Tukang Kayu
L.03 0.30 OH Kepala Tukang
L.04 0.05 OH Mandor
B Bahan
0.04 m3 Kayu Jati Kelas III, papan
0.500 kg Lem Kayu
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

XI A.4.6.1 HARGA SATUAN PEKERJAAN K A Y U


13 A.4.6.1.5c 1 m2 Pembuatan & Pemasangan Daun Pintu Panel, Kayu
A Tenaga
L.01 1.00 OH Pekerja
L.02 3.00 OH Tukang Kayu
L.03 0.30 OH Kepala Tukang
L.04 0.05 OH Mandor
B Bahan
0.04 m3 Kayu Bengkirai, papan
0.500 kg Lem Kayu
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

14 A.4.6.1.5d 1 m2 Pembuatan & Pemasangan Daun Pintu Panel, Kayu


A Tenaga
L.01 1.00 OH Pekerja
L.02 3.00 OH Tukang Kayu
L.03 0.30 OH Kepala Tukang
L.04 0.05 OH Mandor
B Bahan
0.04 m3 Kayu Kamfer, papan
0.500 kg Lem Kayu
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

15 A.4.6.1.5e 1 m2 Pembuatan & Pemasangan Daun Pintu Panel, Kayu


A Tenaga
L.01 1.00 OH Pekerja
L.02 3.00 OH Tukang Kayu
L.03 0.30 OH Kepala Tukang
L.04 0.05 OH Mandor
B Bahan
0.04 m3 Kayu Kruing, papan
0.500 kg Lem Kayu
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

16 A.4.6.1.6a 1 m2 Pembuatan & Pemasangan Pintu & Jendela Kaca Ka


A Tenaga
L.01 0.800 OH Pekerja
L.02 2.400 OH Tukang Kayu
L.03 0.240 OH Kepala Tukang
L.04 0.040 OH Mandor
B Bahan
0.024 m3 Kayu Jati Kelas II, papan
0.300 kg Lem Kayu

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

XI A.4.6.1 HARGA SATUAN PEKERJAAN K A Y U


C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

17 A.4.6.1.6b 1 m2 Pembuatan & Pemasangan Pintu & Jendela Kaca Ka


A Tenaga
L.01 0.800 OH Pekerja
L.02 2.400 OH Tukang Kayu
L.03 0.240 OH Kepala Tukang
L.04 0.040 OH Mandor
B Bahan
0.024 m3 Kayu Jati Kelas III, papan
0.300 kg Lem Kayu
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

18 A.4.6.1.6c 1 m2 Pembuatan & Pemasangan Pintu & Jendela Kaca Ka


A Tenaga
L.01 0.800 OH Pekerja
L.02 2.400 OH Tukang Kayu
L.03 0.240 OH Kepala Tukang
L.04 0.040 OH Mandor
B Bahan
0.024 m3 Kayu Bengkirai, papan
0.300 kg Lem Kayu
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

19 A.4.6.1.6d 1 m2 Pembuatan & Pemasangan Pintu & Jendela Kaca Ka


A Tenaga
L.01 0.800 OH Pekerja
L.02 2.400 OH Tukang Kayu
L.03 0.240 OH Kepala Tukang
L.04 0.040 OH Mandor
B Bahan
0.024 m3 Kayu Kamfer, papan
0.300 kg Lem Kayu
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

20 A.4.6.1.6e 1 m2 Pembuatan & Pemasangan Pintu & Jendela Kaca Ka


A Tenaga
L.01 0.800 OH Pekerja
L.02 2.400 OH Tukang Kayu

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

XI A.4.6.1 HARGA SATUAN PEKERJAAN K A Y U


L.03 0.240 OH Kepala Tukang
L.04 0.040 OH Mandor
B Bahan
0.024 m3 Kayu Kruing, papan
0.300 kg Lem Kayu
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

21 A.4.6.1.7a 1 m2 Pembuatan & Pemasangan Pintu & Jendela Jalusi Ka


A Tenaga
L.01 1 OH Pekerja
L.02 3 OH Tukang Kayu
L.03 0.3 OH Kepala Tukang
L.04 0.05 OH Mandor
B Bahan
0.064 m3 Kayu Klas II (Jati), papan
0.5 kg Lem Kayu
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

22 A.4.6.1.7b 1 m2 Pembuatan & Pemasangan Pintu & Jendela Jalusi Ka


A Tenaga
L.01 1 OH Pekerja
L.02 3 OH Tukang Kayu
L.03 0.3 OH Kepala Tukang
L.04 0.05 OH Mandor
B Bahan
0.064 m3 Kayu Klas III (Jati), papan
0.5 kg Lem Kayu
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

23 A.4.6.1.7c 1 m2 Pembuatan & Pemasangan Pintu & Jendela Jalusi Ka


A Tenaga
L.01 1 OH Pekerja
L.02 3 OH Tukang Kayu
L.03 0.3 OH Kepala Tukang
L.04 0.05 OH Mandor
B Bahan
0.064 m3 Kayu Bengkirai, papan
0.5 kg Lem Kayu
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

XI A.4.6.1 HARGA SATUAN PEKERJAAN K A Y U

24 A.4.6.1.7d 1 m2 Pembuatan & Pemasangan Pintu & Jendela Jalusi Ka


A Tenaga
L.01 1 OH Pekerja
L.02 3 OH Tukang Kayu
L.03 0.3 OH Kepala Tukang
L.04 0.05 OH Mandor
B Bahan
0.064 m3 Kayu Kamfer, papan
0.5 kg Lem Kayu
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

25 A.4.6.1.7e 1 m2 Pembuatan & Pemasangan Pintu & Jendela Jalusi Ka


A Tenaga
L.01 1 OH Pekerja
L.02 3 OH Tukang Kayu
L.03 0.3 OH Kepala Tukang
L.04 0.05 OH Mandor

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

XI A.4.6.1 HARGA SATUAN PEKERJAAN K A Y U


B Bahan
0.064 m3 Kayu Kruing, papan
0.5 kg Lem Kayu
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

26 A.4.6.1.8a 1 m2 Pembuatan&Pemasangan Pintu kayu lapis (Plywoo


A Tenaga
L.01 0.700 OH Pekerja
L.02 2.100 OH Tukang Kayu
L.03 0.210 OH Kepala Tukang
L.04 0.035 OH Mandor
B Bahan
0.025 m3 Kayu Klas II (Jati), papan
0.030 Kg Paku Biasa 1/2" - 1"
0.500 Ltr Lem Kayu
1.000 Lbr Plywood tebal 4 mm uk.90x220cm
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

27 A.4.6.1.8b 1 m2 Pembuatan&Pemasangan Pintu kayu lapis (Plywoo


A Tenaga
L.01 0.700 OH Pekerja
L.02 2.100 OH Tukang Kayu
L.03 0.210 OH Kepala Tukang
L.04 0.035 OH Mandor
B Bahan
0.025 m3 Kayu Klas III (Jati), papan
0.030 Kg Paku Biasa 1/2" - 1"
0.500 Ltr Lem Kayu
1.000 Lbr Plywood tebal 4 mm uk.90x220cm
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

28 A.4.6.1.8c 1 m2 Pembuatan&Pemasangan Pintu kayu lapis (Plywoo


A Tenaga
L.01 0.700 OH Pekerja
L.02 2.100 OH Tukang Kayu
L.03 0.210 OH Kepala Tukang
L.04 0.035 OH Mandor
B Bahan
0.025 m3 Kayu Benkirai, papan
0.030 Kg Paku Biasa 1/2" - 1"
0.500 Ltr Lem Kayu
1.000 Lbr Plywood tebal 4 mm uk.90x220cm

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

XI A.4.6.1 HARGA SATUAN PEKERJAAN K A Y U


C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

29 A.4.6.1.8d 1 m2 Pembuatan&Pemasangan Pintu kayu lapis (Plywoo


A Tenaga
L.01 0.700 OH Pekerja
L.02 2.100 OH Tukang Kayu
L.03 0.210 OH Kepala Tukang
L.04 0.035 OH Mandor
B Bahan
0.025 m3 Kayu Kamfer, papan
0.030 Kg Paku Biasa 1/2" - 1"
0.500 Ltr Lem Kayu
1.000 Lbr Plywood tebal 4 mm uk.90x220cm
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

30 A.4.6.1.8e 1 m2 Pembuatan&Pemasangan Pintu kayu lapis (Plywoo


A Tenaga
L.01 0.700 OH Pekerja
L.02 2.100 OH Tukang Kayu
L.03 0.210 OH Kepala Tukang
L.04 0.035 OH Mandor
B Bahan
0.025 m3 Kayu Kruing, papan
0.030 Kg Paku Biasa 1/2" - 1"
0.500 Ltr Lem Kayu
1.000 Lbr Plywood tebal 4 mm uk.90x220cm
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

31 A.4.6.1.9a 1 m2 Pembuatan&Pemasangan Pintu Plywood rangkap, r


A Tenaga
L.01 0.800 OH Pekerja
L.02 2.400 OH Tukang Kayu
L.03 0.240 OH Kepala Tukang
L.04 0.040 OH Mandor
B Bahan
0.0256 m3 Kayu Klas II (Jati), papan
0.03 Kg Paku Biasa 1/2" - 1"
0.5 Ltr Lem Kayu
1 Lbr Plywood tebal 4 mm uk.90x220cm
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

XI A.4.6.1 HARGA SATUAN PEKERJAAN K A Y U


F Harga Satuan Pekerjaan (D+E)

32 A.4.6.1.9b 1 m2 Pembuatan&Pemasangan Pintu Plywood rangkap, r


A Tenaga
L.01 0.800 OH Pekerja
L.02 2.400 OH Tukang Kayu
L.03 0.240 OH Kepala Tukang
L.04 0.040 OH Mandor
B Bahan
0.0256 m3 Kayu Klas III (Jati), papan
0.03 Kg Paku Biasa 1/2" - 1"
0.5 Ltr Lem Kayu
1 Lbr Plywood tebal 4 mm uk.90x220cm
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

33 A.4.6.1.9c 1 m2 Pembuatan&Pemasangan Pintu Plywood rangkap, r


A Tenaga
L.01 0.800 OH Pekerja
L.02 2.400 OH Tukang Kayu
L.03 0.240 OH Kepala Tukang
L.04 0.040 OH Mandor
B Bahan
0.0256 m3 Kayu Bengkirai, papan
0.03 Kg Paku Biasa 1/2" - 1"
0.5 Ltr Lem Kayu
1 Lbr Plywood tebal 4 mm uk.90x220cm
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

34 A.4.6.1.9d 1 m2 Pembuatan&Pemasangan Pintu Plywood rangkap, r


A Tenaga
L.01 0.800 OH Pekerja
L.02 2.400 OH Tukang Kayu
L.03 0.240 OH Kepala Tukang
L.04 0.040 OH Mandor
B Bahan
0.0256 m3 Kayu Kamfer, papan
0.03 Kg Paku Biasa 1/2" - 1"
0.5 Ltr Lem Kayu
1 Lbr Plywood tebal 4 mm uk.90x220cm
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

35 A.4.6.1.9e 1 m2 Pembuatan&Pemasangan Pintu Plywood rangkap, r

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

XI A.4.6.1 HARGA SATUAN PEKERJAAN K A Y U


A Tenaga
L.01 0.800 OH Pekerja
L.02 2.400 OH Tukang Kayu
L.03 0.240 OH Kepala Tukang
L.04 0.040 OH Mandor
B Bahan
0.0256 m3 Kayu Kruing, papan
0.03 Kg Paku Biasa 1/2" - 1"
0.5 Ltr Lem Kayu
1 Lbr Plywood tebal 4 mm uk.90x220cm
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

36 A.4.6.1.10a 1 m2 Pembuatan & Pemasangan Jalusi mati Kosen Kayu J


A Tenaga
L.01 0.670 OH Pekerja
L.02 2.000 OH Tukang Kayu
L.03 0.200 OH Kepala Tukang
L.04 0.335 OH Mandor

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

XI A.4.6.1 HARGA SATUAN PEKERJAAN K A Y U


B Bahan
0.06 m3 Kayu Klas II (Jati), papan
0.15 Kg Paku Biasa 1/2" - 1"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

37 A.4.6.1.10b 1 m2 Pembuatan & Pemasangan Jalusi mati Kosen Kayu J


A Tenaga
L.01 0.670 OH Pekerja
L.02 2.000 OH Tukang Kayu
L.03 0.200 OH Kepala Tukang
L.04 0.335 OH Mandor
B Bahan
0.06 m3 Kayu Klas III (Jati), papan
0.15 Kg Paku Biasa 1/2" - 1"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

38 A.4.6.1.10c 1 m2 Pembuatan & Pemasangan Jalusi mati Kosen Kayu B


A Tenaga
L.01 0.670 OH Pekerja
L.02 2.000 OH Tukang Kayu
L.03 0.200 OH Kepala Tukang
L.04 0.335 OH Mandor
B Bahan
0.06 m3 Kayu Bengkirai, papan
0.15 Kg Paku Biasa 1/2" - 1"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

39 A.4.6.1.10d 1 m2 Pembuatan & Pemasangan Jalusi mati Kosen Kayu K


A Tenaga
L.01 0.670 OH Pekerja
L.02 2.000 OH Tukang Kayu
L.03 0.200 OH Kepala Tukang
L.04 0.335 OH Mandor
B Bahan
0.06 m3 Kayu Kamfer, papan
0.15 Kg Paku Biasa 1/2" - 1"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

40 A.4.6.1.10e 1 m2 Pembuatan & Pemasangan Jalusi mati Kosen Kayu K

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

XI A.4.6.1 HARGA SATUAN PEKERJAAN K A Y U


A Tenaga
L.01 0.670 OH Pekerja
L.02 2.000 OH Tukang Kayu
L.03 0.200 OH Kepala Tukang
L.04 0.335 OH Mandor
B Bahan
0.06 m3 Kayu Kruing papan
0.15 Kg Paku Biasa 1/2" - 1"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

41 A.4.6.1.11a 1 m2 Pembuatan & Pemasangan Pintu Teakwood Rangka


A Tenaga
L.01 0.80 OH Pekerja
L.02 2.40 OH Tukang Kayu
L.03 0.24 OH Kepala Tukang
L.04 0.04 OH Mandor
B Bahan
0.025 m3 Kayu Klas II (Jati), papan
0.03 Kg Paku Biasa 1/2" - 1"
0.3 kg Lem Kayu
1 Lbr Teakwood (90 x 220) cm x 4 mm
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

42 A.4.6.1.11b 1 m2 Pembuatan & Pemasangan Pintu Teakwood Rangka


A Tenaga
L.01 0.80 OH Pekerja
L.02 2.40 OH Tukang Kayu
L.03 0.24 OH Kepala Tukang
L.04 0.04 OH Mandor

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

XI A.4.6.1 HARGA SATUAN PEKERJAAN K A Y U


B Bahan
0.025 m3 Kayu Klas III (Jati), papan
0.03 Kg Paku Biasa 1/2" - 1"
0.3 kg Lem Kayu
1 Lbr Teakwood (90 x 220) cm x 4 mm
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

43 A.4.6.1.11c 1 m2 Pembuatan & Pemasangan Pintu Teakwood Rangka


A Tenaga
L.01 0.80 OH Pekerja
L.02 2.40 OH Tukang Kayu
L.03 0.24 OH Kepala Tukang
L.04 0.04 OH Mandor
B Bahan
0.025 m3 Kayu Bengkirai, papan
0.03 Kg Paku Biasa 1/2" - 1"
0.3 kg Lem Kayu
1 Lbr Teakwood (90 x 220) cm x 4 mm
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

44 A.4.6.1.11d 1 m2 Pembuatan & Pemasangan Pintu Teakwood Rangka


A Tenaga
L.01 0.80 OH Pekerja
L.02 2.40 OH Tukang Kayu
L.03 0.24 OH Kepala Tukang
L.04 0.04 OH Mandor
B Bahan
0.025 m3 Kayu Kamfer, papan
0.03 Kg Paku Biasa 1/2" - 1"
0.3 kg Lem Kayu
1 Lbr Teakwood (90 x 220) cm x 4 mm
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

45 A.4.6.1.11e 1 m2 Pembuatan & Pemasangan Pintu Teakwood Rangka


A Tenaga
L.01 0.80 OH Pekerja
L.02 2.40 OH Tukang Kayu
L.03 0.24 OH Kepala Tukang
L.04 0.04 OH Mandor
B Bahan
0.025 m3 Kayu Kruing, papan
0.03 Kg Paku Biasa 1/2" - 1"

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

XI A.4.6.1 HARGA SATUAN PEKERJAAN K A Y U


0.3 kg Lem Kayu
1 Lbr Teakwood (90 x 220) cm x 4 mm
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

46 A.4.6.1.12a 1 m2 Pembuatan&Pemasangan Pintu Teakwood Rangkap


A Tenaga
L.01 0.850 OH Pekerja
L.02 2.550 OH Tukang Kayu
L.03 0.255 OH Kepala Tukang
L.04 0.043 OH Mandor
B Bahan
0.025 m3 Kayu Klas II (Kamfer), papan
0.03 Kg Paku Biasa 1/2" - 1"
0.80 kg Lem Kayu
1 Lbr Teakwood (90 x 220) cm x 4 mm
0.5 Lbr Formika
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

47 A.4.6.1.13a 1 m3 Pembuatan&Memasang Konstruksi Kuda-kuda Kon


A Tenaga
L.01 4 OH Pekerja
L.02 12 OH Tukang Kayu
L.03 1.2 OH Kepala Tukang
L.04 0.2 OH Mandor
B Bahan
1.1 m3 Kayu Jati Kelas II, balok
15 Kg Besi Strip
5.6 Kg Paku Biasa 2" - 5"

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

XI A.4.6.1 HARGA SATUAN PEKERJAAN K A Y U


C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

48 A.4.6.1.13b 1 m3 Pembuatan&Memasang Konstruksi Kuda-kuda Kon


A Tenaga
L.01 4 OH Pekerja
L.02 12 OH Tukang Kayu
L.03 1.2 OH Kepala Tukang
L.04 0.2 OH Mandor
B Bahan
1.1 m3 Kayu Jati Kelas III, balok
15 Kg Besi Strip
5.6 Kg Paku Biasa 2" - 5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

49 A.4.6.1.13c 1 m3 Pembuatan&Memasang Konstruksi Kuda-kuda Kon


A Tenaga
L.01 4 OH Pekerja
L.02 12 OH Tukang Kayu
L.03 1.2 OH Kepala Tukang
L.04 0.2 OH Mandor
B Bahan
1.1 m3 Kayu Bengkirai, balok
15 Kg Besi Strip
5.6 Kg Paku Biasa 2" - 5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

50 A.4.6.1.13d 1 m3 Pembuatan&Memasang Konstruksi Kuda-kuda Kon


A Tenaga
L.01 4 OH Pekerja
L.02 12 OH Tukang Kayu
L.03 1.2 OH Kepala Tukang
L.04 0.2 OH Mandor
B Bahan
1.1 m3 Kayu Kamfer, balok
15 Kg Besi Strip
5.6 Kg Paku Biasa 2" - 5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

51 A.4.6.1.13e 1 m3 Pembuatan&Memasang Konstruksi Kuda-kuda Kon

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

XI A.4.6.1 HARGA SATUAN PEKERJAAN K A Y U


A Tenaga
L.01 4 OH Pekerja
L.02 12 OH Tukang Kayu
L.03 1.2 OH Kepala Tukang
L.04 0.2 OH Mandor
B Bahan
1.1 m3 Kayu Kamfer, balok
15 Kg Besi Strip
5.6 Kg Paku Biasa 2" - 5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

52 A.4.6.1.14a 1 m3 Pembuatan&Pemasangan Konstruksi Kuda-kuda Ex


A Tenaga
L.01 6.7 OH Pekerja
L.02 20.1 OH Tukang Kayu
L.03 2.01 OH Kepala Tukang
L.04 0.335 OH Mandor
B Bahan
1.2 m3 Kayu Klas II (jati), balok
15 Kg Besi Strip
5.6 Kg Paku Biasa 2" - 5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

53 A.4.6.1.14b 1 m3 Pembuatan&Pemasangan Konstruksi Kuda-kuda Ex


A Tenaga
L.01 6.7 OH Pekerja
L.02 20.1 OH Tukang Kayu
L.03 2.01 OH Kepala Tukang
L.04 0.335 OH Mandor

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

XI A.4.6.1 HARGA SATUAN PEKERJAAN K A Y U


B Bahan
1.2 m3 Kayu Klas III (jati), balok
15 Kg Besi Strip
5.6 Kg Paku Biasa 2" - 5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

54 A.4.6.1.14c 1 m3 Pembuatan&Pemasangan Konstruksi Kuda-kuda Ex


A Tenaga
L.01 6.7 OH Pekerja
L.02 20.1 OH Tukang Kayu
L.03 2.01 OH Kepala Tukang
L.04 0.335 OH Mandor
B Bahan
1.2 m3 Kayu Bengkirai, balok
15 Kg Besi Strip
5.6 Kg Paku Biasa 2" - 5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

55 A.4.6.1.14d 1 m3 Pembuatan&Pemasangan Konstruksi Kuda-kuda Ex


A Tenaga
L.01 6.7 OH Pekerja
L.02 20.1 OH Tukang Kayu
L.03 2.01 OH Kepala Tukang
L.04 0.335 OH Mandor
B Bahan
1.2 m3 Kayu Kamfer, balok
15 Kg Besi Strip
5.6 Kg Paku Biasa 2" - 5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

56 A.4.6.1.14e 1 m3 Pembuatan&Pemasangan Konstruksi Kuda-kuda Ex


A Tenaga
L.01 6.7 OH Pekerja
L.02 20.1 OH Tukang Kayu
L.03 2.01 OH Kepala Tukang
L.04 0.335 OH Mandor
B Bahan
1.2 m3 Kayu Kruing, balok
15 Kg Besi Strip
5.6 Kg Paku Biasa 2" - 5"
C PERALATAN
D Jumlah A + B + C

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

XI A.4.6.1 HARGA SATUAN PEKERJAAN K A Y U


E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

57 A.4.6.1.15a 1 m3 Pemasangan konstruksi Gording, Kayu Klas Jati Kel


A Tenaga
L.01 2.4 OH Pekerja
L.02 7.2 OH Tukang Kayu
L.03 0.72 OH Kepala Tukang
L.04 0.12 OH Mandor
B Bahan
1.1 m3 Kayu Jati Kelas II, balok
15 Kg Besi Strip
3 Kg Paku Biasa 2" - 5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

58 A.4.6.1.15b 1 m3 Pemasangan konstruksi Gording, Kayu Klas Jati Kel


A Tenaga
L.01 2.4 OH Pekerja
L.02 7.2 OH Tukang Kayu
L.03 0.72 OH Kepala Tukang
L.04 0.12 OH Mandor
B Bahan
1.1 m3 Kayu Jati Kelas III, balok
15 Kg Besi Strip
3 Kg Paku Biasa 2" - 5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

59 A.4.6.1.15c 1 m3 Pemasangan konstruksi Gording, Kayu Klas Bengki


A Tenaga
L.01 2.4 OH Pekerja
L.02 7.2 OH Tukang Kayu
L.03 0.72 OH Kepala Tukang
L.04 0.12 OH Mandor
B Bahan
1.1 m3 Kayu Bengkirai, balok
15 Kg Besi Strip
3 Kg Paku Biasa 2" - 5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

60 A.4.6.1.15d 1 m3 Pemasangan konstruksi Gording, Kayu Klas Kamfer


A Tenaga
L.01 2.4 OH Pekerja

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

XI A.4.6.1 HARGA SATUAN PEKERJAAN K A Y U


L.02 7.2 OH Tukang Kayu
L.03 0.72 OH Kepala Tukang
L.04 0.12 OH Mandor
B Bahan
1.1 m3 Kayu Kamfer, balok
15 Kg Besi Strip
3 Kg Paku Biasa 2" - 5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

61 A.4.6.1.15e 1 m3 Pemasangan konstruksi Gording, Kayu Klas Kruing


A Tenaga
L.01 2.4 OH Pekerja
L.02 7.2 OH Tukang Kayu
L.03 0.72 OH Kepala Tukang
L.04 0.12 OH Mandor
B Bahan
1.1 m3 Kayu Kamfer, balok
15 Kg Besi Strip
3 Kg Paku Biasa 2" - 5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

62 A.4.6.1.16a 1 m2 Pemasangan Rangka Atap Genteng Keramik, Kayu K


A Tenaga
L.01 0.1 OH Pekerja
L.02 0.1 OH Tukang Kayu
L.03 0.01 OH Kepala Tukang
L.04 0.005 OH Mandor
B Bahan
0.014 m3 Kayu Jati Klas II, Kaso-kaso (5x7) cm
0.0036 m3 Reng (2x3) cm
0.25 Kg Paku Biasa 2" - 5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

63 A.4.6.1.16b 1 m2 Pemasangan Rangka Atap Genteng Keramik, Kayu K


A Tenaga
L.01 0.1 OH Pekerja
L.02 0.1 OH Tukang Kayu
L.03 0.01 OH Kepala Tukang
L.04 0.005 OH Mandor
B Bahan
0.014 m3 Kayu Jati Klas III, Kaso-kaso (5x7) cm
0.0036 m3 Reng (2x3) cm

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

XI A.4.6.1 HARGA SATUAN PEKERJAAN K A Y U


0.25 Kg Paku Biasa 2" - 5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

64 A.4.6.1.16c 1 m2 Pemasangan Rangka Atap Genteng Keramik, Kayu B


A Tenaga
L.01 0.1 OH Pekerja
L.02 0.1 OH Tukang Kayu
L.03 0.01 OH Kepala Tukang
L.04 0.005 OH Mandor
B Bahan
0.014 m3 Kayu Bengkirai, Kaso-kaso (5x7) cm
0.0036 m3 Reng (2x3) cm
0.25 Kg Paku Biasa 2" - 5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

XI A.4.6.1 HARGA SATUAN PEKERJAAN K A Y U


65 A.4.6.1.16d 1 m2 Pemasangan Rangka Atap Genteng Keramik, Kayu K
A Tenaga
L.01 0.1 OH Pekerja
L.02 0.1 OH Tukang Kayu
L.03 0.01 OH Kepala Tukang
L.04 0.005 OH Mandor
B Bahan
0.014 m3 Kayu Kamfer, Kaso-kaso (5x7) cm
0.0036 m3 Reng (2x3) cm
0.25 Kg Paku Biasa 2" - 5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

66 A.4.6.1.16e 1 m2 Pemasangan Rangka Atap Genteng Keramik, Kayu K


A Tenaga
L.01 0.1 OH Pekerja
L.02 0.1 OH Tukang Kayu
L.03 0.01 OH Kepala Tukang
L.04 0.005 OH Mandor
B Bahan
0.014 m3 Kayu Kruing, Kaso-kaso (5x7) cm
0.0036 m3 Reng (2x3) cm
0.25 Kg Paku Biasa 2" - 5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

67 A.4.6.1.17a 1 m2 Pemasangan Rangka Atap Genteng Beton, Kayu Jati


A Tenaga
L.01 0.1 OH Pekerja
L.02 0.1 OH Tukang Kayu
L.03 0.01 OH Kepala Tukang
L.04 0.005 OH Mandor
B Bahan
0.014 m3 Kayu Jati kelas II, Kaso-kaso (5x7) cm
0.0072 m3 Reng (2x3) cm
0.25 Kg Paku Biasa 2" - 5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

68 A.4.6.1.17b 1 m2 Pemasangan Rangka Atap Genteng Beton, Kayu Jati


A Tenaga
L.01 0.1 OH Pekerja
L.02 0.1 OH Tukang Kayu
L.03 0.01 OH Kepala Tukang
L.04 0.005 OH Mandor

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

XI A.4.6.1 HARGA SATUAN PEKERJAAN K A Y U


B Bahan
0.014 m3 Kayu Jati kelas III, Kaso-kaso (5x7) cm
0.0072 m3 Reng (2x3) cm
0.25 Kg Paku Biasa 2" - 5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

69 A.4.6.1.17c 1 m2 Pemasangan Rangka Atap Genteng Beton, Kayu Ben


A Tenaga
L.01 0.1 OH Pekerja
L.02 0.1 OH Tukang Kayu
L.03 0.01 OH Kepala Tukang
L.04 0.005 OH Mandor
B Bahan
0.014 m3 Kayu Bengkirai, Kaso-kaso (5x7) cm
0.0072 m3 Reng (2x3) cm
0.25 Kg Paku Biasa 2" - 5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

70 A.4.6.1.17d 1 m2 Pemasangan Rangka Atap Genteng Beton, Kayu Kam


A Tenaga
L.01 0.1 OH Pekerja
L.02 0.1 OH Tukang Kayu
L.03 0.01 OH Kepala Tukang
L.04 0.005 OH Mandor
B Bahan
0.014 m3 Kayu Kamfer, Kaso-kaso (5x7) cm
0.0072 m3 Reng (2x3) cm
0.25 Kg Paku Biasa 2" - 5"

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

XI A.4.6.1 HARGA SATUAN PEKERJAAN K A Y U


C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

71 A.4.6.1.17e 1 m2 Pemasangan Rangka Atap Genteng Beton, Kayu Kru


A Tenaga
L.01 0.1 OH Pekerja
L.02 0.1 OH Tukang Kayu
L.03 0.01 OH Kepala Tukang
L.04 0.005 OH Mandor
B Bahan
0.014 m3 Kayu Kruing, Kaso-kaso (5x7) cm
0.0072 m3 Reng (2x3) cm
0.25 Kg Paku Biasa 2" - 5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

72 A.4.6.1.19a 1 m2 Pemasangan Rangka Langit-langit (50x1,00) m, kay


A Tenaga
L.01 0.15 OH Pekerja
L.02 0.30 OH Tukang Kayu
L.03 0.030 OH Kepala Tukang
L.04 0.075 OH Mandor
B Bahan
0.0154 m3 Kayu Jati kelas II, balok
0.2 Kg Paku Biasa 2" - 5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

73 A.4.6.1.19b 1 m2 Pemasangan Rangka Langit-langit (50x1,00) m, kay


A Tenaga
L.01 0.15 OH Pekerja
L.02 0.30 OH Tukang Kayu
L.03 0.030 OH Kepala Tukang
L.04 0.075 OH Mandor
B Bahan
0.0154 m3 Kayu Jati kelas III, balok
0.2 Kg Paku Biasa 2" - 5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

74 A.4.6.1.19c 1 m2 Pemasangan Rangka Langit-langit (50x1,00) m, kay


A Tenaga
L.01 0.15 OH Pekerja

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

XI A.4.6.1 HARGA SATUAN PEKERJAAN K A Y U


L.02 0.30 OH Tukang Kayu
L.03 0.030 OH Kepala Tukang
L.04 0.075 OH Mandor
B Bahan
0.0154 m3 Kayu Bengkirai, balok
0.2 Kg Paku Biasa 2" - 5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

75 A.4.6.1.19d 1 m2 Pemasangan Rangka Langit-langit (50x1,00) m, kay


A Tenaga
L.01 0.15 OH Pekerja
L.02 0.30 OH Tukang Kayu
L.03 0.030 OH Kepala Tukang
L.04 0.075 OH Mandor
B Bahan
0.0154 m3 Kayu Klas II (Kamfer), balok
0.2 Kg Paku Biasa 2" - 5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

76 A.4.6.1.19e 1 m2 Pemasangan Rangka Langit-langit (50x1,00) m, kay


A Tenaga
L.01 0.15 OH Pekerja
L.02 0.30 OH Tukang Kayu
L.03 0.030 OH Kepala Tukang
L.04 0.075 OH Mandor
B Bahan
0.0154 m3 Kayu Klas Kruing, balok
0.2 Kg Paku Biasa 2" - 5"

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

XI A.4.6.1 HARGA SATUAN PEKERJAAN K A Y U


C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

77 A.4.6.1.19f 1 m2 Pemasangan Rangka Langit-langit (50x1,00) m, kay


A Tenaga
L.01 0.15 OH Pekerja
L.02 0.30 OH Tukang Kayu
L.03 0.030 OH Kepala Tukang
L.04 0.075 OH Mandor
B Bahan
0.0154 m3 Kayu Klas meranti, balok
0.2 Kg Paku Biasa 2" - 5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

78 A.4.6.1.20a 1 m2 Pemasangan Rangka Langit-langit (60x60) cm, kayu


A Tenaga
L.01 0.2 OH Pekerja
L.02 0.3 OH Tukang Kayu
L.03 0.03 OH Kepala Tukang
L.04 0.01 OH Mandor
B Bahan
0.0163 m3 Kayu Jati kelas II, balok
0.25 Kg Paku Biasa 2" - 5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

79 A.4.6.1.20b 1 m2 Pemasangan Rangka Langit-langit (60x60) cm, kayu


A Tenaga
L.01 0.2 OH Pekerja
L.02 0.3 OH Tukang Kayu
L.03 0.03 OH Kepala Tukang
L.04 0.01 OH Mandor
B Bahan
0.0163 m3 Kayu Jati kelas III, balok
0.25 Kg Paku Biasa 2" - 5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

80 A.4.6.1.20c 1 m2 Pemasangan Rangka Langit-langit (60x60) cm, kayu


A Tenaga
L.01 0.2 OH Pekerja
L.02 0.3 OH Tukang Kayu

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

XI A.4.6.1 HARGA SATUAN PEKERJAAN K A Y U


L.03 0.03 OH Kepala Tukang
L.04 0.01 OH Mandor
B Bahan
0.0163 m3 Kayu Bengkirai, balok
0.25 Kg Paku Biasa 2" - 5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

81 A.4.6.1.20d 1 m2 Pemasangan Rangka Langit-langit (60x60) cm, kayu


A Tenaga
L.01 0.2 OH Pekerja
L.02 0.3 OH Tukang Kayu
L.03 0.03 OH Kepala Tukang
L.04 0.01 OH Mandor
B Bahan
0.0163 m3 Kayu Kamfer, balok
0.25 Kg Paku Biasa 2" - 5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

81 A.4.6.1.20e 1 m2 Pemasangan Rangka Langit-langit (60x60) cm, kayu


A Tenaga
L.01 0.2 OH Pekerja
L.02 0.3 OH Tukang Kayu
L.03 0.03 OH Kepala Tukang
L.04 0.01 OH Mandor
B Bahan
0.0163 m3 Kayu Kruing, balok
0.25 Kg Paku Biasa 2" - 5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

82 A.4.6.1.20e 1 m2 Pemasangan Rangka Langit-langit (60x60) cm, kayu


A Tenaga
L.01 0.2 OH Pekerja
L.02 0.3 OH Tukang Kayu
L.03 0.03 OH Kepala Tukang
L.04 0.01 OH Mandor
B Bahan
0.0163 m3 Kayu Meranti, balok
0.25 Kg Paku Biasa 2" - 5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

XI A.4.6.1 HARGA SATUAN PEKERJAAN K A Y U

83 A.4.6.1.21a 1 m' Pemasangan Listplank Uk. (3x20)cm Kayu Jati Kela


A Tenaga
L.01 0.1 OH Pekerja
L.02 0.2 OH Tukang Kayu
L.03 0.020 OH Kepala Tukang
L.04 0.005 OH Mandor
B Bahan
0.0108 m3 Kayu klas II (Jati), papan
0.10 Kg Paku Biasa 2" - 5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

84 A.4.6.1.21b 1 m' Pemasangan Listplank Uk. (3x20)cm Kayu Jati Kela


A Tenaga
L.01 0.1 OH Pekerja
L.02 0.2 OH Tukang Kayu
L.03 0.020 OH Kepala Tukang
L.04 0.005 OH Mandor
B Bahan
0.0108 m3 Kayu klas III (Jati), papan
0.10 Kg Paku Biasa 2" - 5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

85 A.4.6.1.21c 1 m' Pemasangan Listplank Uk. (3x20)cm Kayu Bengkira


A Tenaga
L.01 0.1 OH Pekerja
L.02 0.2 OH Tukang Kayu
L.03 0.020 OH Kepala Tukang
L.04 0.005 OH Mandor
B Bahan
0.0108 m3 Kayu Bengkirai, papan
0.10 Kg Paku Biasa 2" - 5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

86 A.4.6.1.21d 1 m' Pemasangan Listplank Uk. (3x20)cm Kayu Kamfer


A Tenaga
L.01 0.1 OH Pekerja
L.02 0.2 OH Tukang Kayu
L.03 0.020 OH Kepala Tukang
L.04 0.005 OH Mandor
B Bahan
0.0108 m3 Kayu Kamfer, papan

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

XI A.4.6.1 HARGA SATUAN PEKERJAAN K A Y U


0.10 Kg Paku Biasa 2" - 5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

87 A.4.6.1.21e 1 m' Pemasangan Listplank Uk. (3x20)cm Kayu Kruing


A Tenaga
L.01 0.1 OH Pekerja
L.02 0.2 OH Tukang Kayu
L.03 0.020 OH Kepala Tukang
L.04 0.005 OH Mandor
B Bahan
0.0108 m3 Kayu Kruing, papan
0.10 Kg Paku Biasa 2" - 5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

88 A.4.6.1.22a 1 m' Pemasangan Listplank Uk. (3x30)cm Kayu Jati Kela


A Tenaga
L.01 0.1 OH Pekerja
L.02 0.2 OH Tukang Kayu
L.03 0.02 OH Kepala Tukang
L.04 0.005 OH Mandor
B Bahan
0.011 m3 Kayu Jati Kelas II, papan
0.05 Kg Paku Biasa 2" - 5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

89 A.4.6.1.22b 1 m' Pemasangan Listplank Uk. (3x30)cm Kayu Jati Kela


A Tenaga
L.01 0.1 OH Pekerja
L.02 0.2 OH Tukang Kayu
L.03 0.02 OH Kepala Tukang
L.04 0.005 OH Mandor
B Bahan
0.011 m3 Kayu Jati Kelas III, papan
0.05 Kg Paku Biasa 2" - 5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

90 A.4.6.1.22c 1 m' Pemasangan Listplank Uk. (3x30)cm Kayu Bengkira


A Tenaga
L.01 0.1 OH Pekerja

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

XI A.4.6.1 HARGA SATUAN PEKERJAAN K A Y U


L.02 0.2 OH Tukang Kayu
L.03 0.02 OH Kepala Tukang
L.04 0.005 OH Mandor
B Bahan
0.011 m3 Kayu Bengkirai, papan
0.05 Kg Paku Biasa 2" - 5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

91 A.4.6.1.22d 1 m' Pemasangan Listplank Uk. (3x30)cm Kayu Kamfer


A Tenaga
L.01 0.1 OH Pekerja
L.02 0.2 OH Tukang Kayu
L.03 0.02 OH Kepala Tukang
L.04 0.005 OH Mandor
B Bahan
0.011 m3 Kayu Kamfer, papan
0.05 Kg Paku Biasa 2" - 5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

92 A.4.6.1.22e 1 m' Pemasangan Listplank Uk. (3x30)cm Kayu Kruing


A Tenaga
L.01 0.1 OH Pekerja
L.02 0.2 OH Tukang Kayu
L.03 0.02 OH Kepala Tukang
L.04 0.005 OH Mandor
B Bahan
0.011 m3 Kayu Kruing, papan
0.05 Kg Paku Biasa 2" - 5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

93 A.4.6.1.23a 1 m2 Pemasangan Rangka Dinding Pemisah (60x120) cm


A Tenaga
L.01 0.15 OH Pekerja
L.02 0.45 OH Tukang Kayu
L.03 0.045 OH Kepala Tukang
L.04 0.008 OH Mandor
B Bahan
0.028 m3 Kayu Jati Klas II, balok
0.15 Kg Paku Biasa 2" - 5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

XI A.4.6.1 HARGA SATUAN PEKERJAAN K A Y U


F Harga Satuan Pekerjaan (D+E)

94 A.4.6.1.23b 1 m2 Pemasangan Rangka Dinding Pemisah (60x120) cm


A Tenaga
L.01 0.15 OH Pekerja
L.02 0.45 OH Tukang Kayu
L.03 0.045 OH Kepala Tukang
L.04 0.008 OH Mandor

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

XI A.4.6.1 HARGA SATUAN PEKERJAAN K A Y U


B Bahan
0.028 m3 Kayu Jati Klas III, balok
0.15 Kg Paku Biasa 2" - 5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

95 A.4.6.1.23c 1 m2 Pemasangan Rangka Dinding Pemisah (60x120) cm


A Tenaga
L.01 0.15 OH Pekerja
L.02 0.45 OH Tukang Kayu
L.03 0.045 OH Kepala Tukang
L.04 0.008 OH Mandor
B Bahan
0.028 m3 Kayu Bengkirai, balok
0.15 Kg Paku Biasa 2" - 5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

96 A.4.6.1.23d 1 m2 Pemasangan Rangka Dinding Pemisah (60x120) cm


A Tenaga
L.01 0.15 OH Pekerja
L.02 0.45 OH Tukang Kayu
L.03 0.045 OH Kepala Tukang
L.04 0.008 OH Mandor
B Bahan
0.028 m3 Kayu Kamfer, balok
0.15 Kg Paku Biasa 2" - 5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

97 A.4.6.1.23e 1 m2 Pemasangan Rangka Dinding Pemisah (60x120) cm


A Tenaga
L.01 0.15 OH Pekerja
L.02 0.45 OH Tukang Kayu
L.03 0.045 OH Kepala Tukang
L.04 0.008 OH Mandor
B Bahan
0.028 m3 Kayu Kruing, balok
0.15 Kg Paku Biasa 2" - 5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

98 A.4.6.1.24a 1 m2 Pemasangan Dinding Pemisah Teakwood Rangkap R

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

XI A.4.6.1 HARGA SATUAN PEKERJAAN K A Y U


A Tenaga
L.01 0.15 OH Pekerja
L.02 0.45 OH Tukang Kayu
L.03 0.045 OH Kepala Tukang
L.04 0.008 OH Mandor
B Bahan
0.028 m3 Kayu Jati kelas II, balok
0.15 Kg Paku Biasa 2" - 5"
0.86 Lbr Teakwood 120 x 240 cm tebal 4mm
0.56 Ltr Lem
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

99 A.4.6.1.24b 1 m2 Pemasangan Dinding Pemisah Teakwood Rangkap R


A Tenaga
L.01 0.15 OH Pekerja
L.02 0.45 OH Tukang Kayu
L.03 0.045 OH Kepala Tukang
L.04 0.008 OH Mandor
B Bahan
0.028 m3 Kayu Jati kelas III, balok
0.15 Kg Paku Biasa 2" - 5"
0.86 Lbr Teakwood 120 x 240 cm tebal 4mm
0.56 Ltr Lem
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

100 A.4.6.1.24c 1 m2 Pemasangan Dinding Pemisah Teakwood Rangkap R


A Tenaga
L.01 0.15 OH Pekerja
L.02 0.45 OH Tukang Kayu
L.03 0.045 OH Kepala Tukang
L.04 0.008 OH Mandor
B Bahan
0.028 m3 Kayu Bengkirai, balok
0.15 Kg Paku Biasa 2" - 5"
0.86 Lbr Teakwood 120 x 240 cm tebal 4mm
0.56 Ltr Lem
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

101 A.4.6.1.24d 1 m2 Pemasangan Dinding Pemisah Teakwood Rangkap R


A Tenaga
L.01 0.15 OH Pekerja
L.02 0.45 OH Tukang Kayu

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

XI A.4.6.1 HARGA SATUAN PEKERJAAN K A Y U


L.03 0.045 OH Kepala Tukang
L.04 0.008 OH Mandor
B Bahan
0.028 m3 Kayu Kamfer, balok
0.15 Kg Paku Biasa 2" - 5"
0.86 Lbr Teakwood 120 x 240 cm tebal 4mm
0.56 Ltr Lem
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

102 A.4.6.1.24e 1 m2 Pemasangan Dinding Pemisah Teakwood Rangkap R


A Tenaga
L.01 0.15 OH Pekerja
L.02 0.45 OH Tukang Kayu
L.03 0.045 OH Kepala Tukang
L.04 0.008 OH Mandor
B Bahan
0.028 m3 Kayu Kruing, balok
0.15 Kg Paku Biasa 2" - 5"
0.86 Lbr Teakwood 120 x 240 cm tebal 4mm
0.56 Ltr Lem
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

103 A.4.6.1.25a 1 m2 Pemasangan Dinding Pemisah Plywood Rangkap Ra


A Tenaga
L.01 0.020 OH Pekerja
L.02 0.600 OH Tukang Kayu
L.03 0.060 OH Kepala Tukang
L.04 0.010 OH Mandor
B Bahan
0.028 m3 Kayu Jati Kelas II, balok
0.15 Kg Paku Biasa 2" - 5"
0.86 Lbr Plywood 120 x 240 cm tebal 4mm
0.56 Ltr Lem
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

104 A.4.6.1.25b 1 m2 Pemasangan Dinding Pemisah Plywood Rangkap Ra


A Tenaga
L.01 0.020 OH Pekerja
L.02 0.600 OH Tukang Kayu
L.03 0.060 OH Kepala Tukang
L.04 0.010 OH Mandor
B Bahan

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

XI A.4.6.1 HARGA SATUAN PEKERJAAN K A Y U


0.028 m3 Kayu Jati Kelas III, balok
0.15 Kg Paku Biasa 2" - 5"
0.86 Lbr Plywood 120 x 240 cm tebal 4mm
0.56 Ltr Lem
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

105 A.4.6.1.25c 1 m2 Pemasangan Dinding Pemisah Plywood Rangkap Ra


A Tenaga
L.01 0.020 OH Pekerja
L.02 0.600 OH Tukang Kayu
L.03 0.060 OH Kepala Tukang
L.04 0.010 OH Mandor
B Bahan
0.028 m3 Kayu Bengkirai, balok
0.15 Kg Paku Biasa 2" - 5"
0.86 Lbr Plywood 120 x 240 cm tebal 4mm
0.56 Ltr Lem

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

XI A.4.6.1 HARGA SATUAN PEKERJAAN K A Y U


C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

106 A.4.6.1.25d 1 m2 Pemasangan Dinding Pemisah Plywood Rangkap Ra


A Tenaga
L.01 0.020 OH Pekerja
L.02 0.600 OH Tukang Kayu
L.03 0.060 OH Kepala Tukang
L.04 0.010 OH Mandor
B Bahan
0.028 m3 Kayu Kamfer, balok
0.15 Kg Paku Biasa 2" - 5"
0.86 Lbr Plywood 120 x 240 cm tebal 4mm
0.56 Ltr Lem
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

107 A.4.6.1.25e 1 m2 Pemasangan Dinding Pemisah Plywood Rangkap Ra


A Tenaga
L.01 0.020 OH Pekerja
L.02 0.600 OH Tukang Kayu
L.03 0.060 OH Kepala Tukang
L.04 0.010 OH Mandor
B Bahan
0.028 m3 Kayu Kruing, balok
0.15 Kg Paku Biasa 2" - 5"
0.86 Lbr Plywood 120 x 240 cm tebal 4mm
0.56 Ltr Lem
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

108 A.4.6.1.26a 1 m2 Pemasangan Dinding Lambriziring dari Papan Jati K


A Tenaga
L.01 0.6 OH Pekerja
L.02 1.8 OH Tukang Kayu
L.03 0.18 OH Kepala Tukang
L.04 0.03 OH Mandor
B Bahan
0.007 m3 Kayu klas II (Jati), papan
0.1 Kg Paku Biasa 2" - 5"
0.15 Kg Paku Sekrup 3,5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

XI A.4.6.1 HARGA SATUAN PEKERJAAN K A Y U

109 A.4.6.1.26b 1 m2 Pemasangan Dinding Lambriziring dari Papan Jati K


A Tenaga
L.01 0.6 OH Pekerja
L.02 1.8 OH Tukang Kayu
L.03 0.18 OH Kepala Tukang
L.04 0.03 OH Mandor
B Bahan
0.007 m3 Kayu klas III (Jati), papan
0.1 Kg Paku Biasa 2" - 5"
0.15 Kg Paku Sekrup 3,5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

110 A.4.6.1.26c 1 m2 Pemasangan Dinding Lambriziring dari Papan Beng


A Tenaga
L.01 0.6 OH Pekerja
L.02 1.8 OH Tukang Kayu
L.03 0.18 OH Kepala Tukang
L.04 0.03 OH Mandor
B Bahan
0.007 m3 Kayu Bengkirai, papan
0.1 Kg Paku Biasa 2" - 5"
0.15 Kg Paku Sekrup 3,5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

111 A.4.6.1.26d 1 m2 Pemasangan Dinding Lambriziring dari Papan Kam


A Tenaga
L.01 0.6 OH Pekerja
L.02 1.8 OH Tukang Kayu
L.03 0.18 OH Kepala Tukang
L.04 0.03 OH Mandor
B Bahan
0.007 m3 Kayu Kamfer, papan
0.1 Kg Paku Biasa 2" - 5"
0.15 Kg Paku Sekrup 3,5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

112 A.4.6.1.26e 1 m2 Pemasangan Dinding Lambriziring dari Papan Krui


A Tenaga
L.01 0.6 OH Pekerja
L.02 1.8 OH Tukang Kayu
L.03 0.18 OH Kepala Tukang

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

XI A.4.6.1 HARGA SATUAN PEKERJAAN K A Y U


L.04 0.03 OH Mandor
B Bahan
0.007 m3 Kayu Kruing, papan
0.1 Kg Paku Biasa 2" - 5"
0.15 Kg Paku Sekrup 3,5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

113 A.4.6.1.27 1 m2 Pemasangan Dinding Lambriziring dari Plywood u


A Tenaga
L.01 0.025 OH Pekerja
L.02 0.075 OH Tukang Kayu
L.03 0.0080 OH Kepala Tukang
L.04 0.0010 OH Mandor
B Bahan
0.4 Lbr Plywood (120 X 240) cm x 4mm
0.05 Kg Paku Biasa 1/2" - 1"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

114 A.4.6.1.28a 1 m2 Pemasangan Dinding Bilik, Rangka Kayu Kamfer


A Tenaga
L.01 0.1 OH Pekerja
L.02 0.05 OH Tukang Kayu
L.03 0.005 OH Kepala Tukang
L.04 0.005 OH Mandor
B Bahan
1.500 m2 Bilik Bambu
0.014 m3 Kayu Kanfer
0.012 Kg Paku Biasa 1/2" - 1"
0.003 m' List Kayu 2/4
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

115 A.4.6.1.28b 1 m2 Pemasangan Dinding Bilik, Rangka Kayu Kruing


A Tenaga
L.01 0.1 OH Pekerja
L.02 0.05 OH Tukang Kayu
L.03 0.005 OH Kepala Tukang
L.04 0.005 OH Mandor
B Bahan
1.500 m2 Bilik Bambu
0.014 m3 Kayu Kruing
0.012 Kg Paku Biasa 1/2" - 1"
0.003 m' List Kayu 2/4

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

XI A.4.6.1 HARGA SATUAN PEKERJAAN K A Y U


C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

116 A.4.6.1.28c 1 m2 Pemasangan Dinding Bilik, Rangka Kayu Meranti


A Tenaga
L.01 0.1 OH Pekerja
L.02 0.05 OH Tukang Kayu
L.03 0.005 OH Kepala Tukang
L.04 0.005 OH Mandor
B Bahan
1.500 m2 Bilik Bambu
0.014 m3 Kayu Meranti
0.012 Kg Paku Biasa 1/2" - 1"
0.003 m' List Kayu 2/4
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

XI A.4.6.1 HARGA SATUAN PEKERJAAN K A Y U


117 A.4.6.1.29 1 m2 Pemasangan Rangka Langit-langit (1,00x1,00) m, k
A Tenaga
L.01 0.15 OH Pekerja
L.02 0.25 OH Tukang Kayu
L.03 0.025 OH Kepala Tukang
L.04 0.075 OH Mandor
B Bahan
0.0120 m3 Kayu Jati kelas III, balok
0.1 Kg Paku Biasa 2" - 5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

118 A.4.6.1.30 1 m2 Pemasangan Rangka Langit-langit (1,00x1,00) m, k


A Tenaga
L.01 0.15 OH Pekerja
L.02 0.25 OH Tukang Kayu
L.03 0.025 OH Kepala Tukang
L.04 0.075 OH Mandor
B Bahan
0.0120 m3 Kayu Jati kelas III, balok
0.1 Kg Paku Biasa 2" - 5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

119 A.4.6.1.31 1 m2 Pemasangan Rangka Langit-langit (1,00x1,00) m, k


A Tenaga
L.01 0.15 OH Pekerja
L.02 0.25 OH Tukang Kayu
L.03 0.025 OH Kepala Tukang
L.04 0.075 OH Mandor
B Bahan
0.0120 m3 Kayu Bengkirai, balok
0.1 Kg Paku Biasa 2" - 5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

120 A.4.6.1.32 1 m2 Pemasangan Rangka Langit-langit (1,00x1,00) m, k


A Tenaga
L.01 0.15 OH Pekerja
L.02 0.25 OH Tukang Kayu
L.03 0.025 OH Kepala Tukang
L.04 0.075 OH Mandor
B Bahan
0.0120 m3 Kayu Kamfer, balok
0.1 Kg Paku Biasa 2" - 5"

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

XI A.4.6.1 HARGA SATUAN PEKERJAAN K A Y U


C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

121 A.4.6.1.33 1 m2 Pemasangan Rangka Langit-langit (1,00x1,00) m, k


A Tenaga
L.01 0.15 OH Pekerja
L.02 0.25 OH Tukang Kayu
L.03 0.025 OH Kepala Tukang
L.04 0.075 OH Mandor
B Bahan
0.0120 m3 Kayu Kruing, balok
0.1 Kg Paku Biasa 2" - 5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

122 A.4.6.1.34 1 m2 Pemasangan Rangka Langit-langit (1,00x1,00) m, k


A Tenaga
L.01 0.15 OH Pekerja
L.02 0.25 OH Tukang Kayu
L.03 0.025 OH Kepala Tukang
L.04 0.075 OH Mandor
B Bahan
0.0120 m3 Kayu Meranti, balok
0.1 Kg Paku Biasa 2" - 5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

XI A.4.6.1 HARGA SATUAN PEKERJAAN K A Y U


123 A.4.7.1.35 1 m1 Pasang Lisplank GRC 2/20
A Tenaga
L.01 0.05 OH Pekerja
L.02 0.100 OH Tukang Atap
L.03 0.0100 OH Kepala Tukang
L.04 0.0010 OH Mandor
B Bahan
1.1 m' Lisplank GRC 20 cm
4.00 pcs Paku Sekrup
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

124 A.4.7.1.36 1 m1 Pasang Lisplank GRC 2/30


A Tenaga
L.01 0.05 OH Pekerja
L.02 0.100 OH Tukang Atap
L.03 0.0100 OH Kepala Tukang
L.04 0.0010 OH Mandor
B Bahan
1.1 m' Lisplank GRC 20 cm
4.00 pcs Paku Sekrup
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

125 A.4.6.1.37 1 m3 Pembuatan&Memasang Konstruksi Kuda-kuda Kay


A Tenaga
L.01 4 OH Pekerja
L.02 12 OH Tukang Kayu
L.03 1.2 OH Kepala Tukang
L.04 0.2 OH Mandor
B Bahan

1.100 m3 Kayu Jati Kelas II, balok

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

XI A.4.6.1 HARGA SATUAN PEKERJAAN K A Y U

15.000 Kg Besi Strip

0.800 Kg Paku Biasa 2" - 5"


C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

126 A.4.6.1.38 1 m3 Pembuatan&Memasang Konstruksi Kuda-kuda Kay


A Tenaga
L.01 4 OH Pekerja
L.02 12 OH Tukang Kayu
L.03 1.2 OH Kepala Tukang
L.04 0.2 OH Mandor
B Bahan

1.100 m3 Kayu Jati Kelas III, balok

15.000 Kg Besi Strip

0.800 Kg Paku Biasa 2" - 5"


C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

127 A.4.6.1.39 1 m3 Pembuatan&Memasang Konstruksi Kuda-kuda Kay


A Tenaga
L.01 4 OH Pekerja
L.02 12 OH Tukang Kayu

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

XI A.4.6.1 HARGA SATUAN PEKERJAAN K A Y U


L.03 1.2 OH Kepala Tukang
L.04 0.2 OH Mandor
B Bahan

1.100 m3 Kayu Bengkirai, balok

15.000 Kg Besi Strip

0.800 Kg Paku Biasa 2" - 5"


C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

128 A.4.6.1.40 1 m3 Pembuatan&Memasang Konstruksi Kuda-kuda Kay


A Tenaga
L.01 4 OH Pekerja
L.02 12 OH Tukang Kayu
L.03 1.2 OH Kepala Tukang
L.04 0.2 OH Mandor
B Bahan

1.100 m3 Kayu Kamfer, balok

15.000 Kg Besi Strip

0.800 Kg Paku Biasa 2" - 5"


C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

129 A.4.6.1.41 1 m3 Pembuatan&Memasang Konstruksi Kuda-kuda Kay


A Tenaga
L.01 4 OH Pekerja
L.02 12 OH Tukang Kayu
L.03 1.2 OH Kepala Tukang
L.04 0.2 OH Mandor
B Bahan

1.100 m3 Kayu Kruing, balok

15.000 Kg Besi Strip

0.800 Kg Paku Biasa 2" - 5"

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

XI A.4.6.1 HARGA SATUAN PEKERJAAN K A Y U


C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp

n Kosen Pintu & Jendela Kayu Jati Kelas II 19,556,663.50


1,501,065.00
41,400.00 248,400.00
61,950.00 1,115,100.00
66,100.00 118,980.00
61,950.00 18,585.00
16,277,720.00
13,537,100.00 16,244,520.00
14,000.00 17,500.00
15,700.00 15,700.00

17,778,785.00
0.10 1,777,878.50
19,556,663.50

n Kosen Pintu & Jendela Kayu Jati Kelas III 16,807,631.50


1,501,065.00
41,400.00 248,400.00
61,950.00 1,115,100.00
66,100.00 118,980.00
61,950.00 18,585.00
13,778,600.00
11,454,500.00 13,745,400.00
14,000.00 17,500.00
15,700.00 15,700.00

15,279,665.00
0.10 1,527,966.50
16,807,631.50

n Kosen Pintu & Jendela Kayu Bengkirai 13,963,691.50


1,501,065.00
41,400.00 248,400.00
61,950.00 1,115,100.00
66,100.00 118,980.00
61,950.00 18,585.00
11,193,200.00
9,300,000.00 11,160,000.00
14,000.00 17,500.00
15,700.00 15,700.00

12,694,265.00
0.10 1,269,426.50
13,963,691.50

n Kosen Pintu & Jendela Kayu Kamfer 11,347,583.50


1,501,065.00
41,400.00 248,400.00
61,950.00 1,115,100.00
66,100.00 118,980.00
61,950.00 18,585.00

CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp

8,814,920.00
7,318,100.00 8,781,720.00
14,000.00 17,500.00
15,700.00 15,700.00

10,315,985.00
0.10 1,031,598.50
11,347,583.50

n Kosen Pintu & Jendela Kayu Kruing 9,079,691.50


1,501,065.00
41,400.00 248,400.00
61,950.00 1,115,100.00
66,100.00 118,980.00
61,950.00 18,585.00
6,753,200.00
5,600,000.00 6,720,000.00
14,000.00 17,500.00
15,700.00 15,700.00

8,254,265.00
0.10 825,426.50
9,079,691.50

n Pintu Klamp Standard Kayu Jati Kelas II 738,576.41


87,593.10
41,400.00 14,490.00
61,950.00 65,047.50
66,100.00 6,940.50
61,950.00 1,115.10
583,840.00
14,578,500.00 583,140.00
14,000.00 700.00

671,433.10
0.10 67,143.31
738,576.41

n Pintu Klamp Standard Kayu Jati Kelas III 646,937.61


87,593.10
41,400.00 14,490.00
61,950.00 65,047.50
66,100.00 6,940.50
61,950.00 1,115.10
500,532.00
12,495,800.00 499,832.00
14,000.00 700.00

588,125.10
0.10 58,812.51
646,937.61

CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp

n Pintu Klamp Standard Kayu Bengkirai 550,322.41


87,593.10
41,400.00 14,490.00
61,950.00 65,047.50
66,100.00 6,940.50
61,950.00 1,115.10
412,700.00
10,300,000.00 412,000.00
14,000.00 700.00

500,293.10
0.10 50,029.31
550,322.41

n Pintu Klamp Standard Kayu Kamfer 429,846.01


87,593.10
41,400.00 14,490.00
61,950.00 65,047.50
66,100.00 6,940.50
61,950.00 1,115.10
303,176.00
7,561,900.00 302,476.00
14,000.00 700.00

390,769.10
0.10 39,076.91
429,846.01

n Pintu Klamp Standard Kayu Kruing 352,322.41


87,593.10
41,400.00 14,490.00
61,950.00 65,047.50
66,100.00 6,940.50
61,950.00 1,115.10
232,700.00
5,800,000.00 232,000.00
14,000.00 700.00

320,293.10
0.10 32,029.31
352,322.41

n Daun Pintu Panel, Kayu Jati Kelas II 925,284.25


250,177.50
41,400.00 41,400.00
61,950.00 185,850.00
66,100.00 19,830.00
61,950.00 3,097.50
590,990.00
14,578,500.00 583,140.00

CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp

15,700.00 7,850.00

841,167.50
0.10 84,116.75
925,284.25

n Daun Pintu Panel, Kayu Jati Kelas III 833,645.45


250,177.50
41,400.00 41,400.00
61,950.00 185,850.00
66,100.00 19,830.00
61,950.00 3,097.50
507,682.00
12,495,800.00 499,832.00
15,700.00 7,850.00

757,859.50
0.10 75,785.95
833,645.45

CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp

n Daun Pintu Panel, Kayu Bengkirai 737,030.25


250,177.50
41,400.00 41,400.00
61,950.00 185,850.00
66,100.00 19,830.00
61,950.00 3,097.50
419,850.00
10,300,000.00 412,000.00
15,700.00 7,850.00

670,027.50
0.10 67,002.75
737,030.25

n Daun Pintu Panel, Kayu Kamfer 616,553.85


250,177.50
41,400.00 41,400.00
61,950.00 185,850.00
66,100.00 19,830.00
61,950.00 3,097.50
310,326.00
7,561,900.00 302,476.00
15,700.00 7,850.00

560,503.50
0.10 56,050.35
616,553.85

n Daun Pintu Panel, Kayu Kruing 539,030.25


250,177.50
41,400.00 41,400.00
61,950.00 185,850.00
66,100.00 19,830.00
61,950.00 3,097.50
239,850.00
5,800,000.00 232,000.00
15,700.00 7,850.00

490,027.50
0.10 49,002.75
539,030.25

n Pintu & Jendela Kaca Kayu Jati Kelas II 610,209.60


200,142.00
41,400.00 33,120.00
61,950.00 148,680.00
66,100.00 15,864.00
61,950.00 2,478.00
354,594.00
14,578,500.00 349,884.00
15,700.00 4,710.00

CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp

554,736.00
0.10 55,473.60
610,209.60

n Pintu & Jendela Kaca Kayu Jati Kelas III 555,226.32


200,142.00
41,400.00 33,120.00
61,950.00 148,680.00
66,100.00 15,864.00
61,950.00 2,478.00
304,609.20
12,495,800.00 299,899.20
15,700.00 4,710.00

504,751.20
0.10 50,475.12
555,226.32

n Pintu & Jendela Kaca Kayu Bengkirai 497,257.20


200,142.00
41,400.00 33,120.00
61,950.00 148,680.00
66,100.00 15,864.00
61,950.00 2,478.00
251,910.00
10,300,000.00 247,200.00
15,700.00 4,710.00

452,052.00
0.10 45,205.20
497,257.20

n Pintu & Jendela Kaca Kayu Kamfer 424,971.36


200,142.00
41,400.00 33,120.00
61,950.00 148,680.00
66,100.00 15,864.00
61,950.00 2,478.00
186,195.60
7,561,900.00 181,485.60
15,700.00 4,710.00

386,337.60
0.10 38,633.76
424,971.36

n Pintu & Jendela Kaca Kayu Kruing 378,457.20


200,142.00
41,400.00 33,120.00
61,950.00 148,680.00

CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp

66,100.00 15,864.00
61,950.00 2,478.00
143,910.00
5,800,000.00 139,200.00
15,700.00 4,710.00

344,052.00
0.10 34,405.20
378,457.20

n Pintu & Jendela Jalusi Kayu Jati Kelas II 1,310,156.65


250,177.50
41,400.00 41,400.00
61,950.00 185,850.00
66,100.00 19,830.00
61,950.00 3,097.50
940,874.00
14,578,500.00 933,024.00
15,700.00 7,850.00

1,191,051.50
0.10 119,105.15
1,310,156.65

n Pintu & Jendela Jalusi Kayu Jati Kelas III 1,163,534.57


250,177.50
41,400.00 41,400.00
61,950.00 185,850.00
66,100.00 19,830.00
61,950.00 3,097.50
807,581.20
12,495,800.00 799,731.20
15,700.00 7,850.00

1,057,758.70
0.10 105,775.87
1,163,534.57

n Pintu & Jendela Jalusi Kayu Bengkirai 1,008,950.25


250,177.50
41,400.00 41,400.00
61,950.00 185,850.00
66,100.00 19,830.00
61,950.00 3,097.50
667,050.00
10,300,000.00 659,200.00
15,700.00 7,850.00

917,227.50
0.10 91,722.75
1,008,950.25

CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp

n Pintu & Jendela Jalusi Kayu Kamfer 816,188.01


250,177.50
41,400.00 41,400.00
61,950.00 185,850.00
66,100.00 19,830.00
61,950.00 3,097.50
491,811.60
7,561,900.00 483,961.60
15,700.00 7,850.00

741,989.10
0.10 74,198.91
816,188.01

n Pintu & Jendela Jalusi Kayu Kruing 692,150.25


250,177.50
41,400.00 41,400.00
61,950.00 185,850.00
66,100.00 19,830.00
61,950.00 3,097.50

CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp

379,050.00
5,800,000.00 371,200.00
15,700.00 7,850.00

629,227.50
0.10 62,922.75
692,150.25

Pintu kayu lapis (Plywood) Rangkap rangka Kayu Jati Klas I 660,722.43
175,124.25
41,400.00 28,980.00
61,950.00 130,095.00
66,100.00 13,881.00
61,950.00 2,168.25
425,532.50
14,578,500.00 364,462.50
14,000.00 420.00
15,700.00 7,850.00
52,800.00 52,800.00

600,656.75
0.10 60,065.68
660,722.43 660,722.43

Pintu kayu lapis (Plywood) Rangkap rangka Kayu Jati Klas II 603,448.18
175,124.25
41,400.00 28,980.00
61,950.00 130,095.00
66,100.00 13,881.00
61,950.00 2,168.25
373,465.00
12,495,800.00 312,395.00
14,000.00 420.00
15,700.00 7,850.00
52,800.00 52,800.00

548,589.25
0.10 54,858.93
603,448.18

Pintu kayu lapis (Plywood) Rangkap rangka Kayu Bengkirai 543,063.68


175,124.25
41,400.00 28,980.00
61,950.00 130,095.00
66,100.00 13,881.00
61,950.00 2,168.25
318,570.00
10,300,000.00 257,500.00
14,000.00 420.00
15,700.00 7,850.00
52,800.00 52,800.00

CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp

493,694.25
0.10 49,369.43
543,063.68

Pintu kayu lapis (Plywood) Rangkap rangka Kayu Kamfer (l 467,765.93


175,124.25
41,400.00 28,980.00
61,950.00 130,095.00
66,100.00 13,881.00
61,950.00 2,168.25
250,117.50
7,561,900.00 189,047.50
14,000.00 420.00
15,700.00 7,850.00
52,800.00 52,800.00

425,241.75
0.10 42,524.18
467,765.93

Pintu kayu lapis (Plywood) Rangkap rangka Kayu Kruing (l 419,313.68


175,124.25
41,400.00 28,980.00
61,950.00 130,095.00
66,100.00 13,881.00
61,950.00 2,168.25
206,070.00
5,800,000.00 145,000.00
14,000.00 420.00
15,700.00 7,850.00
52,800.00 52,800.00

381,194.25
0.10 38,119.43
419,313.68

Pintu Plywood rangkap, rangka expose kayu Jati kelas II 697,863.76


200,142.00
41,400.00 33,120.00
61,950.00 148,680.00
66,100.00 15,864.00
61,950.00 2,478.00
434,279.60
14,578,500.00 373,209.60
14,000.00 420.00
15,700.00 7,850.00
52,800.00 52,800.00

634,421.60
0.10 63,442.16

CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp

697,863.76

Pintu Plywood rangkap, rangka expose kayu Jati kelas III 639,214.93
200,142.00
41,400.00 33,120.00
61,950.00 148,680.00
66,100.00 15,864.00
61,950.00 2,478.00
380,962.48
12,495,800.00 319,892.48
14,000.00 420.00
15,700.00 7,850.00
52,800.00 52,800.00

581,104.48
0.10 58,110.45
639,214.93

Pintu Plywood rangkap, rangka expose kayu Bengkirai 577,381.20


200,142.00
41,400.00 33,120.00
61,950.00 148,680.00
66,100.00 15,864.00
61,950.00 2,478.00
324,750.00
10,300,000.00 263,680.00
14,000.00 420.00
15,700.00 7,850.00
52,800.00 52,800.00

524,892.00
0.10 52,489.20
577,381.20

Pintu Plywood rangkap, rangka expose kayu Kamfer 500,276.30


200,142.00
41,400.00 33,120.00
61,950.00 148,680.00
66,100.00 15,864.00
61,950.00 2,478.00
254,654.64
7,561,900.00 193,584.64
14,000.00 420.00
15,700.00 7,850.00
52,800.00 52,800.00

454,796.64
0.10 45,479.66
500,276.30

Pintu Plywood rangkap, rangka expose kayu Kruing 450,661.20

CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp

200,142.00
41,400.00 33,120.00
61,950.00 148,680.00
66,100.00 15,864.00
61,950.00 2,478.00
209,550.00
5,800,000.00 148,480.00
14,000.00 420.00
15,700.00 7,850.00
52,800.00 52,800.00

409,692.00
0.10 40,969.20
450,661.20

n Jalusi mati Kosen Kayu Jati Kelas II 1,168,663.38


185,611.25
41,400.00 27,738.00
61,950.00 123,900.00
66,100.00 13,220.00
61,950.00 20,753.25

CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp

876,810.00
14,578,500.00 874,710.00
14,000.00 2,100.00

1,062,421.25
0.10 106,242.13
1,168,663.38

n Jalusi mati Kosen Kayu Jati Kelas III 1,031,205.18


185,611.25
41,400.00 27,738.00
61,950.00 123,900.00
66,100.00 13,220.00
61,950.00 20,753.25
751,848.00
12,495,800.00 749,748.00
14,000.00 2,100.00

937,459.25
0.10 93,745.93
1,031,205.18

n Jalusi mati Kosen Kayu Bengkirai 886,282.38


185,611.25
41,400.00 27,738.00
61,950.00 123,900.00
66,100.00 13,220.00
61,950.00 20,753.25
620,100.00
10,300,000.00 618,000.00
14,000.00 2,100.00

805,711.25
0.10 80,571.13
886,282.38

n Jalusi mati Kosen Kayu Kamfer 705,567.78


185,611.25
41,400.00 27,738.00
61,950.00 123,900.00
66,100.00 13,220.00
61,950.00 20,753.25
455,814.00
7,561,900.00 453,714.00
14,000.00 2,100.00

641,425.25
0.10 64,142.53
705,567.78

n Jalusi mati Kosen Kayu Kruing 589,282.38

CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp

185,611.25
41,400.00 27,738.00
61,950.00 123,900.00
66,100.00 13,220.00
61,950.00 20,753.25
350,100.00
5,800,000.00 348,000.00
14,000.00 2,100.00

535,711.25
0.10 53,571.13
589,282.38

n Pintu Teakwood Rangkap, Rangka Expose Kayu Jati Kelas I 684,787.95


200,142.00
41,400.00 33,120.00
61,950.00 148,680.00
66,100.00 15,864.00
61,950.00 2,478.00
422,392.50
14,578,500.00 364,462.50
14,000.00 420.00
15,700.00 4,710.00
52,800.00 52,800.00

622,534.50
0.10 62,253.45
684,787.95

n Pintu Teakwood Rangkap, Rangka Expose Kayu Jati Kelas I 627,513.70


200,142.00
41,400.00 33,120.00
61,950.00 148,680.00
66,100.00 15,864.00
61,950.00 2,478.00

CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp

370,325.00
12,495,800.00 312,395.00
14,000.00 420.00
15,700.00 4,710.00
52,800.00 52,800.00

570,467.00
0.10 57,046.70
627,513.70

n Pintu Teakwood Rangkap, Rangka Expose Kayu Bengkirai 567,129.20


200,142.00
41,400.00 33,120.00
61,950.00 148,680.00
66,100.00 15,864.00
61,950.00 2,478.00
315,430.00
10,300,000.00 257,500.00
14,000.00 420.00
15,700.00 4,710.00
52,800.00 52,800.00

515,572.00
0.10 51,557.20
567,129.20

n Pintu Teakwood Rangkap, Rangka Expose Kayu Kamfer 491,831.45


200,142.00
41,400.00 33,120.00
61,950.00 148,680.00
66,100.00 15,864.00
61,950.00 2,478.00
246,977.50
7,561,900.00 189,047.50
14,000.00 420.00
15,700.00 4,710.00
52,800.00 52,800.00

447,119.50
0.10 44,711.95
491,831.45

n Pintu Teakwood Rangkap, Rangka Expose Kayu Kruing 443,379.20


200,142.00
41,400.00 33,120.00
61,950.00 148,680.00
66,100.00 15,864.00
61,950.00 2,478.00
202,930.00
5,800,000.00 145,000.00
14,000.00 420.00

CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp

15,700.00 4,710.00
52,800.00 52,800.00

403,072.00
0.10 40,307.20
443,379.20

Pintu Teakwood Rangkap Lapis Formika,Rangka expose K 555,510.29


212,681.85
41,400.00 35,190.00
61,950.00 157,972.50
66,100.00 16,855.50
61,950.00 2,663.85
292,327.50
7,561,900.00 189,047.50
14,000.00 420.00
15,700.00 12,560.00
52,800.00 52,800.00
75,000.00 37,500.00

505,009.35
0.10 50,500.94
555,510.29

onstruksi Kuda-kuda Konvensional Kayu Jati Kelas II Benta 17,634,562.00


1,000,710.00
41,400.00 165,600.00
61,950.00 743,400.00
66,100.00 79,320.00
61,950.00 12,390.00
15,030,710.00
13,537,100.00 14,890,810.00
4,100.00 61,500.00
14,000.00 78,400.00

CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp

16,031,420.00
0.10 1,603,142.00
17,634,562.00

onstruksi Kuda-kuda Konvensional Kayu Jati Kelas III Bent 15,114,616.00


1,000,710.00
41,400.00 165,600.00
61,950.00 743,400.00
66,100.00 79,320.00
61,950.00 12,390.00
12,739,850.00
11,454,500.00 12,599,950.00
4,100.00 61,500.00
14,000.00 78,400.00

13,740,560.00
0.10 1,374,056.00
15,114,616.00

onstruksi Kuda-kuda Konvensional Kayu Bengkirai Bentang 12,507,671.00


1,000,710.00
41,400.00 165,600.00
61,950.00 743,400.00
66,100.00 79,320.00
61,950.00 12,390.00
10,369,900.00
9,300,000.00 10,230,000.00
4,100.00 61,500.00
14,000.00 78,400.00

11,370,610.00
0.10 1,137,061.00
12,507,671.00

onstruksi Kuda-kuda Konvensional Kayu Kamfer Bentang 6 10,109,572.00


1,000,710.00
41,400.00 165,600.00
61,950.00 743,400.00
66,100.00 79,320.00
61,950.00 12,390.00
8,189,810.00
7,318,100.00 8,049,910.00
4,100.00 61,500.00
14,000.00 78,400.00

9,190,520.00
0.10 919,052.00
10,109,572.00

onstruksi Kuda-kuda Konvensional Kayu Kruing Bentang 6 8,030,671.00

CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp

1,000,710.00
41,400.00 165,600.00
61,950.00 743,400.00
66,100.00 79,320.00
61,950.00 12,390.00
6,299,900.00
5,600,000.00 6,160,000.00
4,100.00 61,500.00
14,000.00 78,400.00

7,300,610.00
0.10 730,061.00
8,030,671.00

Konstruksi Kuda-kuda Expose, Kayu Jati Kelas II 19,866,670.18


1,676,189.25
41,400.00 277,380.00
61,950.00 1,245,195.00
66,100.00 132,861.00
61,950.00 20,753.25
16,384,420.00
13,537,100.00 16,244,520.00
4,100.00 61,500.00
14,000.00 78,400.00

18,060,609.25
0.10 1,806,060.93
19,866,670.18

Konstruksi Kuda-kuda Expose, Kayu Jati Kelas III 17,117,638.18


1,676,189.25
41,400.00 277,380.00
61,950.00 1,245,195.00
66,100.00 132,861.00
61,950.00 20,753.25

CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp

13,885,300.00
11,454,500.00 13,745,400.00
4,100.00 61,500.00
14,000.00 78,400.00

15,561,489.25
0.10 1,556,148.93
17,117,638.18

Konstruksi Kuda-kuda Expose, Kayu Bengkirai 14,273,698.18


1,676,189.25
41,400.00 277,380.00
61,950.00 1,245,195.00
66,100.00 132,861.00
61,950.00 20,753.25
11,299,900.00
9,300,000.00 11,160,000.00
4,100.00 61,500.00
14,000.00 78,400.00

12,976,089.25
0.10 1,297,608.93
14,273,698.18

Konstruksi Kuda-kuda Expose, Kayu Kamfer 11,657,590.18


1,676,189.25
41,400.00 277,380.00
61,950.00 1,245,195.00
66,100.00 132,861.00
61,950.00 20,753.25
8,921,620.00
7,318,100.00 8,781,720.00
4,100.00 61,500.00
14,000.00 78,400.00

10,597,809.25
0.10 1,059,780.93
11,657,590.18

Konstruksi Kuda-kuda Expose, Kayu Kruing 9,389,698.18


1,676,189.25
41,400.00 277,380.00
61,950.00 1,245,195.00
66,100.00 132,861.00
61,950.00 20,753.25
6,859,900.00
5,600,000.00 6,720,000.00
4,100.00 61,500.00
14,000.00 78,400.00

8,536,089.25

CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp

0.10 853,608.93
9,389,698.18

Gording, Kayu Klas Jati Kelas II 17,154,209.60


600,426.00
41,400.00 99,360.00
61,950.00 446,040.00
66,100.00 47,592.00
61,950.00 7,434.00
14,994,310.00
13,537,100.00 14,890,810.00
4,100.00 61,500.00
14,000.00 42,000.00

15,594,736.00 15,594,736.00
0.10 1,559,473.60 1,559,473.60
17,154,209.60 17,154,209.60

Gording, Kayu Klas Jati Kelas III 14,634,263.60


600,426.00
41,400.00 99,360.00
61,950.00 446,040.00
66,100.00 47,592.00
61,950.00 7,434.00
12,703,450.00
11,454,500.00 12,599,950.00
4,100.00 61,500.00
14,000.00 42,000.00

13,303,876.00
0.10 1,330,387.60
14,634,263.60

Gording, Kayu Klas Bengkirai 12,027,318.60


600,426.00
41,400.00 99,360.00
61,950.00 446,040.00
66,100.00 47,592.00
61,950.00 7,434.00
10,333,500.00
9,300,000.00 10,230,000.00
4,100.00 61,500.00
14,000.00 42,000.00

10,933,926.00
0.10 1,093,392.60
12,027,318.60

Gording, Kayu Klas Kamfer 9,629,219.60


600,426.00
41,400.00 99,360.00

CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp

61,950.00 446,040.00
66,100.00 47,592.00
61,950.00 7,434.00
8,153,410.00
7,318,100.00 8,049,910.00
4,100.00 61,500.00
14,000.00 42,000.00

8,753,836.00
0.10 875,383.60
9,629,219.60

Gording, Kayu Klas Kruing 7,550,318.60


600,426.00
41,400.00 99,360.00
61,950.00 446,040.00
66,100.00 47,592.00
61,950.00 7,434.00
6,263,500.00
5,600,000.00 6,160,000.00
4,100.00 61,500.00
14,000.00 42,000.00

6,863,926.00
0.10 686,392.60
7,550,318.60

Genteng Keramik, Kayu Klas Jati Kelas II 259,258.37


11,305.75
41,400.00 4,140.00
61,950.00 6,195.00
66,100.00 661.00
61,950.00 309.75
224,383.68
13,537,100.00 189,519.40
8,712,300.00 31,364.28
14,000.00 3,500.00

235,689.43
0.10 23,568.94
259,258.37

Genteng Keramik, Kayu Klas Jati Kelas III 227,186.33


11,305.75
41,400.00 4,140.00
61,950.00 6,195.00
66,100.00 661.00
61,950.00 309.75
195,227.28
11,454,500.00 160,363.00
8,712,300.00 31,364.28

CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp

14,000.00 3,500.00

206,533.03
0.10 20,653.30
227,186.33

Genteng Keramik, Kayu Bengkirai 167,886.04


11,305.75
41,400.00 4,140.00
61,950.00 6,195.00
66,100.00 661.00
61,950.00 309.75
141,317.92
8,500,000.00 119,000.00
5,227,200.00 18,817.92
14,000.00 3,500.00

152,623.67
0.10 15,262.37
167,886.04

CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp

Genteng Keramik, Kayu Kamfer 157,964.74


11,305.75
41,400.00 4,140.00
61,950.00 6,195.00
66,100.00 661.00
61,950.00 309.75
132,298.56
7,318,100.00 102,453.40
7,318,100.00 26,345.16
14,000.00 3,500.00

143,604.31
0.10 14,360.43
157,964.74

Genteng Keramik, Kayu Kruing 121,622.33


11,305.75
41,400.00 4,140.00
61,950.00 6,195.00
66,100.00 661.00
61,950.00 309.75
99,260.00
5,400,000.00 75,600.00
5,600,000.00 20,160.00
14,000.00 3,500.00

110,565.75
0.10 11,056.58
121,622.33

Genteng Beton, Kayu Jati kelas II 293,759.08


11,305.75
41,400.00 4,140.00
61,950.00 6,195.00
66,100.00 661.00
61,950.00 309.75
255,747.96
13,537,100.00 189,519.40
8,712,300.00 62,728.56
14,000.00 3,500.00

267,053.71
0.10 26,705.37
293,759.08

Genteng Beton, Kayu Jati kelas III 261,687.04


11,305.75
41,400.00 4,140.00
61,950.00 6,195.00
66,100.00 661.00
61,950.00 309.75

CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp

226,591.56
11,454,500.00 160,363.00
8,712,300.00 62,728.56
14,000.00 3,500.00

237,897.31
0.10 23,789.73
261,687.04

Genteng Beton, Kayu Bengkirai 188,585.75


11,305.75
41,400.00 4,140.00
61,950.00 6,195.00
66,100.00 661.00
61,950.00 309.75
160,135.84
8,500,000.00 119,000.00
5,227,200.00 37,635.84
14,000.00 3,500.00

171,441.59
0.10 17,144.16
188,585.75

Genteng Beton, Kayu Kamfer 186,944.42


11,305.75
41,400.00 4,140.00
61,950.00 6,195.00
66,100.00 661.00
61,950.00 309.75
158,643.72
7,318,100.00 102,453.40
7,318,100.00 52,690.32
14,000.00 3,500.00

CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp

169,949.47
0.10 16,994.95
186,944.42

Genteng Beton, Kayu Kruing 143,798.33


11,305.75
41,400.00 4,140.00
61,950.00 6,195.00
66,100.00 661.00
61,950.00 309.75
119,420.00
5,400,000.00 75,600.00
5,600,000.00 40,320.00
14,000.00 3,500.00

130,725.75
0.10 13,072.58
143,798.33

git-langit (50x1,00) m, kayu Jati Kelas II 266,965.15


31,424.25
41,400.00 6,210.00
61,950.00 18,585.00
66,100.00 1,983.00
61,950.00 4,646.25
211,271.34
13,537,100.00 208,471.34
14,000.00 2,800.00

242,695.59
0.10 24,269.56
266,965.15

git-langit (50x1,00) m, kayu Jati Kelas III 231,685.91


31,424.25
41,400.00 6,210.00
61,950.00 18,585.00
66,100.00 1,983.00
61,950.00 4,646.25
179,199.30
11,454,500.00 176,399.30
14,000.00 2,800.00

210,623.55
0.10 21,062.36
231,685.91

git-langit (50x1,00) m, kayu Bengkirai 195,188.68


31,424.25
41,400.00 6,210.00

CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp

61,950.00 18,585.00
66,100.00 1,983.00
61,950.00 4,646.25
146,020.00
9,300,000.00 143,220.00
14,000.00 2,800.00

177,444.25
0.10 17,744.43
195,188.68

git-langit (50x1,00) m, kayu Kamfer 161,615.29


31,424.25
41,400.00 6,210.00
61,950.00 18,585.00
66,100.00 1,983.00
61,950.00 4,646.25
115,498.74
7,318,100.00 112,698.74
14,000.00 2,800.00

146,922.99
0.10 14,692.30
161,615.29

git-langit (50x1,00) m, kayu Kruing 132,510.68


31,424.25
41,400.00 6,210.00
61,950.00 18,585.00
66,100.00 1,983.00
61,950.00 4,646.25
89,040.00
5,600,000.00 86,240.00
14,000.00 2,800.00

CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp

120,464.25
0.10 12,046.43
132,510.68

git-langit (50x1,00) m, kayu Meranti 107,100.68


31,424.25
41,400.00 6,210.00
61,950.00 18,585.00
66,100.00 1,983.00
61,950.00 4,646.25
65,940.00
4,100,000.00 63,140.00
14,000.00 2,800.00

97,364.25
0.10 9,736.43
107,100.68

git-langit (60x60) cm, kayu Jati kelas II 278,984.45


29,467.50
41,400.00 8,280.00
61,950.00 18,585.00
66,100.00 1,983.00
61,950.00 619.50
224,154.73
13,537,100.00 220,654.73
14,000.00 3,500.00

253,622.23
0.10 25,362.22
278,984.45

git-langit (60x60) cm, kayu Jati kelas III 241,643.44


29,467.50
41,400.00 8,280.00
61,950.00 18,585.00
66,100.00 1,983.00
61,950.00 619.50
190,208.35
11,454,500.00 186,708.35
14,000.00 3,500.00

219,675.85
0.10 21,967.59
241,643.44

git-langit (60x60) cm, kayu Bengkirai 203,013.25


29,467.50
41,400.00 8,280.00
61,950.00 18,585.00

CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp

66,100.00 1,983.00
61,950.00 619.50
155,090.00
9,300,000.00 151,590.00
14,000.00 3,500.00

184,557.50
0.10 18,455.75
203,013.25

git-langit (60x60) cm, kayu Kamfer 167,477.78


29,467.50
41,400.00 8,280.00
61,950.00 18,585.00
66,100.00 1,983.00
61,950.00 619.50
122,785.03
7,318,100.00 119,285.03
14,000.00 3,500.00

152,252.53
0.10 15,225.25
167,477.78

git-langit (60x60) cm, kayu Kruing 136,672.25


29,467.50
41,400.00 8,280.00
61,950.00 18,585.00
66,100.00 1,983.00
61,950.00 619.50
94,780.00
5,600,000.00 91,280.00
14,000.00 3,500.00

124,247.50
0.10 12,424.75
136,672.25

git-langit (60x60) cm, kayu Meranti 109,777.25


29,467.50
41,400.00 8,280.00
61,950.00 18,585.00
66,100.00 1,983.00
61,950.00 619.50
70,330.00
4,100,000.00 66,830.00
14,000.00 3,500.00

99,797.50
0.10 9,979.75
109,777.25

CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp

. (3x20)cm Kayu Jati Kelas II 194,710.51


18,161.75
41,400.00 4,140.00
61,950.00 12,390.00
66,100.00 1,322.00
61,950.00 309.75
158,847.80
14,578,500.00 157,447.80
14,000.00 1,400.00

177,009.55
0.10 17,700.96
194,710.51

. (3x20)cm Kayu Jati Kelas III 169,968.03


18,161.75
41,400.00 4,140.00
61,950.00 12,390.00
66,100.00 1,322.00
61,950.00 309.75
136,354.64
12,495,800.00 134,954.64
14,000.00 1,400.00

154,516.39
0.10 15,451.64
169,968.03

. (3x20)cm Kayu Bengkirai 143,881.93


18,161.75
41,400.00 4,140.00
61,950.00 12,390.00
66,100.00 1,322.00
61,950.00 309.75
112,640.00
10,300,000.00 111,240.00
14,000.00 1,400.00

130,801.75
0.10 13,080.18
143,881.93

. (3x20)cm Kayu Kamfer 111,353.30


18,161.75
41,400.00 4,140.00
61,950.00 12,390.00
66,100.00 1,322.00
61,950.00 309.75
83,068.52
7,561,900.00 81,668.52

CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp

14,000.00 1,400.00

101,230.27
0.10 10,123.03
111,353.30

. (3x20)cm Kayu Kruing 90,421.93


18,161.75
41,400.00 4,140.00
61,950.00 12,390.00
66,100.00 1,322.00
61,950.00 309.75
64,040.00
5,800,000.00 62,640.00
14,000.00 1,400.00

82,201.75
0.10 8,220.18
90,421.93

. (3x30)cm Kayu Jati Kelas II 197,147.78


18,161.75
41,400.00 4,140.00
61,950.00 12,390.00
66,100.00 1,322.00
61,950.00 309.75
161,063.50
14,578,500.00 160,363.50
14,000.00 700.00

179,225.25
0.10 17,922.53
197,147.78

. (3x30)cm Kayu Jati Kelas III 171,947.11


18,161.75
41,400.00 4,140.00
61,950.00 12,390.00
66,100.00 1,322.00
61,950.00 309.75
138,153.80
12,495,800.00 137,453.80
14,000.00 700.00

156,315.55
0.10 15,631.56
171,947.11

. (3x30)cm Kayu Bengkirai 145,377.93


18,161.75
41,400.00 4,140.00

CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp

61,950.00 12,390.00
66,100.00 1,322.00
61,950.00 309.75
114,000.00
10,300,000.00 113,300.00
14,000.00 700.00

132,161.75
0.10 13,216.18
145,377.93

. (3x30)cm Kayu Kamfer 112,246.92


18,161.75
41,400.00 4,140.00
61,950.00 12,390.00
66,100.00 1,322.00
61,950.00 309.75
83,880.90
7,561,900.00 83,180.90
14,000.00 700.00

102,042.65
0.10 10,204.27
112,246.92

. (3x30)cm Kayu Kruing 90,927.93


18,161.75
41,400.00 4,140.00
61,950.00 12,390.00
66,100.00 1,322.00
61,950.00 309.75
64,500.00
5,800,000.00 63,800.00
14,000.00 700.00

82,661.75
0.10 8,266.18
90,927.93

ding Pemisah (60x120) cm Kayu Jati Kelas II 460,566.04


37,557.60
41,400.00 6,210.00
61,950.00 27,877.50
66,100.00 2,974.50
61,950.00 495.60
381,138.80
13,537,100.00 379,038.80
14,000.00 2,100.00

418,696.40
0.10 41,869.64

CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp

460,566.04

ding Pemisah (60x120) cm Kayu Jati Kelas III 396,421.96


37,557.60
41,400.00 6,210.00
61,950.00 27,877.50
66,100.00 2,974.50
61,950.00 495.60

CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp

322,826.00
11,454,500.00 320,726.00
14,000.00 2,100.00

360,383.60
0.10 36,038.36
396,421.96

ding Pemisah (60x120) cm Kayu Bengkirai 330,063.36


37,557.60
41,400.00 6,210.00
61,950.00 27,877.50
66,100.00 2,974.50
61,950.00 495.60
262,500.00
9,300,000.00 260,400.00
14,000.00 2,100.00

300,057.60
0.10 30,005.76
330,063.36

ding Pemisah (60x120) cm Kayu Kamfer 269,020.84


37,557.60
41,400.00 6,210.00
61,950.00 27,877.50
66,100.00 2,974.50
61,950.00 495.60
207,006.80
7,318,100.00 204,906.80
14,000.00 2,100.00

244,564.40
0.10 24,456.44
269,020.84

ding Pemisah (60x120) cm Kayu Kruing 216,103.36


37,557.60
41,400.00 6,210.00
61,950.00 27,877.50
66,100.00 2,974.50
61,950.00 495.60
158,900.00
5,600,000.00 156,800.00
14,000.00 2,100.00

196,457.60
0.10 19,645.76
216,103.36

misah Teakwood Rangkap Rangka Kayu Jati kelas II 545,917.24

CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp

37,557.60
41,400.00 6,210.00
61,950.00 27,877.50
66,100.00 2,974.50
61,950.00 495.60
458,730.80
13,537,100.00 379,038.80
14,000.00 2,100.00
80,000.00 68,800.00
15,700.00 8,792.00

496,288.40
0.10 49,628.84
545,917.24

misah Teakwood Rangkap Rangka Kayu Jati kelas III 481,773.16


37,557.60
41,400.00 6,210.00
61,950.00 27,877.50
66,100.00 2,974.50
61,950.00 495.60
400,418.00
11,454,500.00 320,726.00
14,000.00 2,100.00
80,000.00 68,800.00
15,700.00 8,792.00

437,975.60
0.10 43,797.56
481,773.16

misah Teakwood Rangkap Rangka Kayu Bengkirai 415,414.56


37,557.60
41,400.00 6,210.00
61,950.00 27,877.50
66,100.00 2,974.50
61,950.00 495.60
340,092.00
9,300,000.00 260,400.00
14,000.00 2,100.00
80,000.00 68,800.00
15,700.00 8,792.00

377,649.60
0.10 37,764.96
415,414.56

misah Teakwood Rangkap Rangka Kayu Kamfer 354,372.04


37,557.60
41,400.00 6,210.00
61,950.00 27,877.50

CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp

66,100.00 2,974.50
61,950.00 495.60
284,598.80
7,318,100.00 204,906.80
14,000.00 2,100.00
80,000.00 68,800.00
15,700.00 8,792.00

322,156.40
0.10 32,215.64
354,372.04

misah Teakwood Rangkap Rangka Kayu Kruing 301,454.56


37,557.60
41,400.00 6,210.00
61,950.00 27,877.50
66,100.00 2,974.50
61,950.00 495.60
236,492.00
5,600,000.00 156,800.00
14,000.00 2,100.00
80,000.00 68,800.00
15,700.00 8,792.00

274,049.60
0.10 27,404.96
301,454.56

misah Plywood Rangkap Rangka Kayu Jati Kelas II 551,445.73


42,583.50
41,400.00 828.00
61,950.00 37,170.00
66,100.00 3,966.00
61,950.00 619.50
458,730.80
13,537,100.00 379,038.80
14,000.00 2,100.00
80,000.00 68,800.00
15,700.00 8,792.00

501,314.30
0.10 50,131.43
551,445.73

misah Plywood Rangkap Rangka Kayu Jati Kelas III 487,301.65


42,583.50
41,400.00 828.00
61,950.00 37,170.00
66,100.00 3,966.00
61,950.00 619.50
400,418.00

CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp

11,454,500.00 320,726.00
14,000.00 2,100.00
80,000.00 68,800.00
15,700.00 8,792.00

443,001.50
0.10 44,300.15
487,301.65

misah Plywood Rangkap Rangka Kayu Bengkirai 420,943.05


42,583.50
41,400.00 828.00
61,950.00 37,170.00
66,100.00 3,966.00
61,950.00 619.50
340,092.00
9,300,000.00 260,400.00
14,000.00 2,100.00
80,000.00 68,800.00
15,700.00 8,792.00

CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp

382,675.50
0.10 38,267.55
420,943.05

misah Plywood Rangkap Rangka Kayu Kamfer 359,900.53


42,583.50
41,400.00 828.00
61,950.00 37,170.00
66,100.00 3,966.00
61,950.00 619.50
284,598.80
7,318,100.00 204,906.80
14,000.00 2,100.00
80,000.00 68,800.00
15,700.00 8,792.00

327,182.30
0.10 32,718.23
359,900.53

misah Plywood Rangkap Rangka Kayu Kruing 306,983.05


42,583.50
41,400.00 828.00
61,950.00 37,170.00
66,100.00 3,966.00
61,950.00 619.50
236,492.00
5,600,000.00 156,800.00
14,000.00 2,100.00
80,000.00 68,800.00
15,700.00 8,792.00

279,075.50
0.10 27,907.55
306,983.05

mbriziring dari Papan Jati Kelas II 281,898.10


150,106.50
41,400.00 24,840.00
61,950.00 111,510.00
66,100.00 11,898.00
61,950.00 1,858.50
106,164.50
14,578,500.00 102,049.50
14,000.00 1,400.00
18,100.00 2,715.00

256,271.00
0.10 25,627.10
281,898.10

CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp

mbriziring dari Papan Jati Kelas III 265,861.31


150,106.50
41,400.00 24,840.00
61,950.00 111,510.00
66,100.00 11,898.00
61,950.00 1,858.50
91,585.60
12,495,800.00 87,470.60
14,000.00 1,400.00
18,100.00 2,715.00

241,692.10
0.10 24,169.21
265,861.31

mbriziring dari Papan Bengkirai 248,953.65


150,106.50
41,400.00 24,840.00
61,950.00 111,510.00
66,100.00 11,898.00
61,950.00 1,858.50
76,215.00
10,300,000.00 72,100.00
14,000.00 1,400.00
18,100.00 2,715.00

226,321.50
0.10 22,632.15
248,953.65

mbriziring dari Papan Kamfer 227,870.28


150,106.50
41,400.00 24,840.00
61,950.00 111,510.00
66,100.00 11,898.00
61,950.00 1,858.50
57,048.30
7,561,900.00 52,933.30
14,000.00 1,400.00
18,100.00 2,715.00

207,154.80
0.10 20,715.48
227,870.28

mbriziring dari Papan Kruing 214,303.65


150,106.50
41,400.00 24,840.00
61,950.00 111,510.00
66,100.00 11,898.00

CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp

61,950.00 1,858.50
44,715.00
5,800,000.00 40,600.00
14,000.00 1,400.00
18,100.00 2,715.00

194,821.50
0.10 19,482.15
214,303.65

mbriziring dari Plywood ukuran (120x240) cm 35,301.20


6,272.00
41,400.00 1,035.00
61,950.00 4,646.25
66,100.00 528.80
61,950.00 61.95
25,820.00
62,800.00 25,120.00
14,000.00 700.00

32,092.00
0.10 3,209.20
35,301.20

k, Rangka Kayu Kamfer 158,325.37


7,877.75
41,400.00 4,140.00
61,950.00 3,097.50
66,100.00 330.50
61,950.00 309.75
136,054.40
20,000.00 30,000.00
7,561,900.00 105,866.60
14,000.00 168.00
6,600.00 19.80

143,932.15
0.10 14,393.22
158,325.37

k, Rangka Kayu Kruing 131,192.11


7,877.75
41,400.00 4,140.00
61,950.00 3,097.50
66,100.00 330.50
61,950.00 309.75
111,387.80
20,000.00 30,000.00
5,800,000.00 81,200.00
14,000.00 168.00
6,600.00 19.80

CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp

119,265.55
0.10 11,926.56
131,192.11

k, Rangka Kayu Meranti 112,712.11


7,877.75
41,400.00 4,140.00
61,950.00 3,097.50
66,100.00 330.50
61,950.00 309.75
94,587.80
20,000.00 30,000.00
4,600,000.00 64,400.00
14,000.00 168.00
6,600.00 19.80

102,465.55
0.10 10,246.56
112,712.11

CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp

git-langit (1,00x1,00) m, kayu Jati kelas II 211,025.60


27,996.25
41,400.00 6,210.00
61,950.00 15,487.50
66,100.00 1,652.50
61,950.00 4,646.25
163,845.20
13,537,100.00 162,445.20
14,000.00 1,400.00

191,841.45
0.10 19,184.15
211,025.60

git-langit (1,00x1,00) m, kayu Jati kelas III 183,535.28


27,996.25
41,400.00 6,210.00
61,950.00 15,487.50
66,100.00 1,652.50
61,950.00 4,646.25
138,854.00
11,454,500.00 137,454.00
14,000.00 1,400.00

166,850.25
0.10 16,685.03
183,535.28

git-langit (1,00x1,00) m, kayu Bengkirai 155,095.88


27,996.25
41,400.00 6,210.00
61,950.00 15,487.50
66,100.00 1,652.50
61,950.00 4,646.25
113,000.00
9,300,000.00 111,600.00
14,000.00 1,400.00

140,996.25
0.10 14,099.63
155,095.88

git-langit (1,00x1,00) m, kayu Kamfer 128,934.80


27,996.25
41,400.00 6,210.00
61,950.00 15,487.50
66,100.00 1,652.50
61,950.00 4,646.25
89,217.20
7,318,100.00 87,817.20
14,000.00 1,400.00

CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp

117,213.45
0.10 11,721.35
128,934.80

git-langit (1,00x1,00) m, kayu Kruing 106,255.88


27,996.25
41,400.00 6,210.00
61,950.00 15,487.50
66,100.00 1,652.50
61,950.00 4,646.25
68,600.00
5,600,000.00 67,200.00
14,000.00 1,400.00

96,596.25
0.10 9,659.63
106,255.88

git-langit (1,00x1,00) m, kayu Meranti 86,455.88


27,996.25
41,400.00 6,210.00
61,950.00 15,487.50
66,100.00 1,652.50
61,950.00 4,646.25
50,600.00
4,100,000.00 49,200.00
14,000.00 1,400.00

78,596.25
0.10 7,859.63
86,455.88

CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp

29,304.50
8,577.95
41,400.00 2,070.00
57,850.00 5,785.00
66,100.00 661.00
61,950.00 61.95
18,062.50
16,250.00 17,062.50
250.00 1,000.00

26,640.45
10% 2,664.05
29,304.50

36,523.25
8,577.95
41,400.00 2,070.00
57,850.00 5,785.00
66,100.00 661.00
61,950.00 61.95
24,625.00
22,500.00 23,625.00
250.00 1,000.00

33,202.95
10% 3,320.30
36,523.25

onstruksi Kuda-kuda Kayu Jati kelas II 17,560,642.00


1,000,710.00
41,400.00 165,600.00
61,950.00 743,400.00
66,100.00 79,320.00
61,950.00 12,390.00
14,963,510.00
13,537,100.00 14,890,810.00

CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp

4,100.00 61,500.00
14,000.00 11,200.00

15,964,220.00
0.10 1,596,422.00
17,560,642.00

onstruksi Kuda-kuda Kayu Jati kelas III 15,040,696.00


1,000,710.00
41,400.00 165,600.00
61,950.00 743,400.00
66,100.00 79,320.00
61,950.00 12,390.00
12,672,650.00
11,454,500.00 12,599,950.00
4,100.00 61,500.00
14,000.00 11,200.00

13,673,360.00
0.10 1,367,336.00
15,040,696.00

onstruksi Kuda-kuda Kayu Bengkirai 12,433,751.00


1,000,710.00
41,400.00 165,600.00
61,950.00 743,400.00

CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp

66,100.00 79,320.00
61,950.00 12,390.00
10,302,700.00
9,300,000.00 10,230,000.00
4,100.00 61,500.00
14,000.00 11,200.00

11,303,410.00
0.10 1,130,341.00
12,433,751.00

onstruksi Kuda-kuda Kayu Kamfer 10,035,652.00


1,000,710.00
41,400.00 165,600.00
61,950.00 743,400.00
66,100.00 79,320.00
61,950.00 12,390.00
8,122,610.00
7,318,100.00 8,049,910.00
4,100.00 61,500.00
14,000.00 11,200.00

9,123,320.00
0.10 912,332.00
10,035,652.00

onstruksi Kuda-kuda Kayu Kruing 7,956,751.00


1,000,710.00
41,400.00 165,600.00
61,950.00 743,400.00
66,100.00 79,320.00
61,950.00 12,390.00
6,232,700.00
5,600,000.00 6,160,000.00
4,100.00 61,500.00
14,000.00 11,200.00

CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp

7,233,410.00
0.10 723,341.00
7,956,751.00

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

XII A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI dan KACA


1 A.4.6.2.2 1 Buah Pemasangan Kunci Tanam Biasa
A Tenaga
L.01 0.01 OH Pekerja
L.02 0.5 OH Tukang Kayu
L.03 0.01 OH Kepala Tukang
L.04 0.005 OH Mandor
B Bahan
1 Buah Kunci Tanam Biasa
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
Overhead & Profit
2 A.4.6.2.3 1 Buah Pemasangan Kunci Kamar Mandi
A Tenaga
L.01 0.005 OH Pekerja
L.02 0.5 OH Tukang Kayu
L.03 0.005 OH Kepala Tukang
L.04 0.0025 OH Mandor
B Bahan
1 Buah Kunci Tanam Kamar Mandi
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

3 A.4.6.2.4 1 Buah Pemasangan Kunci Selinder


A Tenaga
L.01 0.005 OH Pekerja
L.02 0.5 OH Tukang Kayu
L.03 0.005 OH Kepala Tukang
L.04 0.0025 OH Mandor
B Bahan
1 Buah Kunci Selinder
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

4 A.4.6.2.5 1 Buah Pemasangan Engsel Pintu


A Tenaga
L.01 0.015 OH Pekerja
L.02 0.15 OH Tukang Kayu
L.03 0.015 OH Kepala Tukang
L.04 0.0075 OH Mandor
B Bahan
1 Buah Engsel pintu
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

XII A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI dan KACA

5 A.4.6.2.6 1 Buah Pemasangan Engsel Jendela Kupu-kupu


A Tenaga
L.01 0.01 OH Pekerja
L.02 0.1 OH Tukang Kayu
L.03 0.01 OH Kepala Tukang
L.04 0.001 OH Mandor
B Bahan
1 Buah Engsel Jendela
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

6 A.4.6.2.9 1 Buah Pemasangan Kait Angin


A Tenaga
L.01 0.015 OH Pekerja
L.02 0.15 OH Tukang Kayu
L.03 0.015 OH Kepala Tukang
L.04 0.008 OH Mandor
B Bahan
1 Buah Kait Angin
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

7 A.4.6.2.11a 1 Buah Pemasangan Kunci Selot Sekelas Kuda Terbang


A Tenaga
L.01 0.02 OH Pekerja
L.02 0.2 OH Tukang Kayu
L.03 0.02 OH Kepala Tukang
L.04 0.001 OH Mandor
B Bahan
1 Buah Kunci Selot Sekelas Kuda Terbang

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

XII A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI dan KACA


C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

8 A.4.6.2.11b 1 Buah Pemasangan Kunci Selot Sekelas Anchor


A Tenaga
L.01 0.02 OH Pekerja
L.02 0.2 OH Tukang Kayu
L.03 0.02 OH Kepala Tukang
L.04 0.001 OH Mandor
B Bahan
1 Buah Kunci Selot Sekelas Anchor
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

9 A.4.6.2.15 1 Buah Pemasangan Kunci Lemari


A Tenaga
L.01 0.025 OH Pekerja
L.02 0.25 OH Tukang Kayu
L.03 0.025 OH Kepala Tukang
L.04 0.00130 OH Mandor
B Bahan
1 Buah Kunci Lemari
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

10 A.4.6.2.16 1 m2 Pemasangan Kaca bening tebal 3 mm


A Tenaga
L.01 0.015 OH Pekerja
L.02 0.15 OH Tukang Kayu
L.03 0.015 OH Kepala Tukang
L.04 0.00075 OH Mandor
B Bahan
1.1 m2 Kaca tebal 3mm
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

11 A.4.6.2.17 1 m2 Pemasangan Kaca bening tebal 5 mm


A Tenaga
L.01 0.015 OH Pekerja
L.02 0.15 OH Tukang Kayu
L.03 0.015 OH Kepala Tukang
L.04 0.00075 OH Mandor
B Bahan

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

XII A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI dan KACA


1.1 m2 Kaca tebal 5mm
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

12 A.4.6.2.17a 1 m2 Pemasangan Kaca Rayban tebal 5 mm


A Tenaga
L.01 0.015 OH Pekerja
L.02 0.15 OH Tukang Kayu
L.03 0.015 OH Kepala Tukang
L.04 0.00075 OH Mandor
B Bahan
1.1 m2 Kaca Rayban tebal 5 mm
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
KUNCI dan KACA
180,135.73
32,359.75
41,400.00 414.00
61,950.00 30,975.00
66,100.00 661.00
61,950.00 309.75
131,400.00
131,400.00 131,400.00

163,759.75
10% 16,375.98
180,135.73

89,284.11
31,667.38
41,400.00 207.00
61,950.00 30,975.00
66,100.00 330.50
61,950.00 154.88
49,500.00
49,500.00 49,500.00

81,167.38
10% 8,116.74
89,284.11

179,374.11
31,667.38
41,400.00 207.00
61,950.00 30,975.00
66,100.00 330.50
61,950.00 154.88
131,400.00
131,400.00 131,400.00

163,067.38
10% 16,306.74
179,374.11

21,526.59
11,369.63
41,400.00 621.00
61,950.00 9,292.50
66,100.00 991.50
61,950.00 464.63
8,200.00
8,200.00 8,200.00

19,569.63
10% 1,956.96
21,526.59

CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
KUNCI dan KACA

17,051.07
7,300.98
41,400.00 414.00
61,950.00 6,195.00
66,100.00 661.00
61,950.00 30.98
8,200.00
8,200.00 8,200.00

15,500.98
10% 1,550.10
17,051.07

15,180.66
11,400.60
41,400.00 621.00
61,950.00 9,292.50
66,100.00 991.50
61,950.00 495.60
2,400.00
2,400.00 2,400.00

13,800.60
10% 1,380.06
15,180.66

las Kuda Terbang 70,512.15


14,601.95
41,400.00 828.00
61,950.00 12,390.00
66,100.00 1,322.00
61,950.00 61.95
49,500.00
49,500.00 49,500.00

CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
KUNCI dan KACA

64,101.95
10% 6,410.20
70,512.15

187,772.15
14,601.95
41,400.00 828.00
61,950.00 12,390.00
66,100.00 1,322.00
61,950.00 61.95
156,100.00
156,100.00 156,100.00

170,701.95
10% 17,070.20
187,772.15

25,581.09
18,255.54
41,400.00 1,035.00
61,950.00 15,487.50
66,100.00 1,652.50
61,950.00 80.54
5,000.00
5,000.00 5,000.00

23,255.54
10% 2,325.55
25,581.09

81,016.61
10,951.46
41,400.00 621.00
61,950.00 9,292.50
66,100.00 991.50
61,950.00 46.46
62,700.00
57,000.00 62,700.00

73,651.46
10% 7,365.15
81,016.61

106,426.61
10,951.46
41,400.00 621.00
61,950.00 9,292.50
66,100.00 991.50
61,950.00 46.46
85,800.00

CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
KUNCI dan KACA
78,000.00 85,800.00

96,751.46
10% 9,675.15
106,426.61

119,736.61
10,951.46
41,400.00 621.00
61,950.00 9,292.50
66,100.00 991.50
61,950.00 46.46
97,900.00
89,000.00 97,900.00

108,851.46
10% 10,885.15
119,736.61

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

XIII A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN


1 A.4.7.1.1 1 m2 Pengikisan / pengerokan Permukaan Cat Tembok Lam
A Tenaga
L.01 0.15 OH Pekerja
L.04 0.0030 OH Mandor
B Bahan
0.05 Kg Soda Api
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

2 A.4.7.1.4 1 m2 Pengecatan Bidang Kayu Baru (1 lp Plamur, 1 lp Cat da


A Tenaga
L.01 0.070 OH Pekerja
L.02 0.009 OH Tukang Cat
L.03 0.006 OH Kepala Tukang
L.04 0.003 OH Mandor
B Bahan
0.2000 kg Cat Menie
0.1500 kg Plamuur
0.1700 kg Cat Dasar
0.2600 kg Cat Penutup
0.0100 bh Kuas
0.0300 kg Pengencer
0.2000 lbr Amplas
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

3 A.4.7.1.5 1 m2 Pengecatan Bidang Kayu Baru (1 lp Plamuur, 1 lp Cat d


A Tenaga
L.01 0.070 OH Pekerja
L.02 0.105 OH Tukang Cat
L.03 0.004 OH Kepala Tukang
L.04 0.003 OH Mandor
B Bahan
0.2000 kg Cat Menie
0.1500 kg Plamuur
0.1700 kg Cat Dasar
0.3500 kg Cat Penutup
0.0100 bh Kuas
0.0300 kg Pengencer
0.2000 lbr Amplas
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

XIII A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN

4 A.4.7.1.6 1 m2 Pelaburan Bidang Kayu dg Teak Oil


A Tenaga
L.01 0.04 OH Pekerja
L.02 0.063 OH Tukang Cat
L.03 0.063 OH Kepala Tukang
L.04 0.0030 OH Mandor
B Bahan
0.36 Ltr Teak Oil
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%)
F Harga Satuan Pekerjaan (D+E)

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

XIII A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN


5 A.4.7.1.7 1 m2 Pelaburan Bidang Kayu dg Politur
A Tenaga
L.01 0.04 OH Pekerja
L.02 0.06 OH Tukang Cat
L.03 0.016 OH Kepala Tukang
L.04 0.0030 OH Mandor
B Bahan
0.15 Ltr Politur
0.372 Ltr Politur Jadi
2 Lbr Ampelas
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

6 A.4.7.1.8 1 m2 Pelaburan Bidang Kayu dg Cat Residu & Ter


A Tenaga
L.01 0.1 OH Pekerja
L.04 0.006 OH Mandor
B Bahan
0.35 Ltr Residu atau Ter
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

7 A.4.7.1.9 1 m2 Pelaburan Bidang Kayu dg Vernis


A Tenaga
L.01 0.16 OH Pekerja
L.02 0.16 OH Tukang Cat
L.03 0.016 OH Kepala Tukang
L.04 0.0030 OH Mandor
B Bahan
0.15 Ltr Vernis
0.05 Ltr Dempul
0.1 Lbr Ampelas
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

8 A.4.7.1.10 1 m2 Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar 2 l


A Tenaga
L.01 0.02 OH Pekerja
L.02 0.063 OH Tukang Cat
L.03 0.0063 OH Kepala Tukang
L.04 0.0030 OH Mandor
B Bahan

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

XIII A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN


0.1 Kg Plamir
0.1 Kg Cat Dasar
0.26 Kg Cat Penutup 2 kali
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

9 A.4.7.1.11 1 m2 Pengecatan Tembok Lama (1lap.Plamir, 2lap Cat Penut


A Tenaga
L.01 0.028 OH Pekerja
L.02 0.042 OH Tukang Cat
L.03 0.0042 OH Kepala Tukang
L.04 0.0030 OH Mandor
B Bahan
0.12 Kg Cat Dasar
0.18 Kg Cat Penutup 2 kali
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

10 A.4.7.1.15 1 m2 Pemasangan Wallpaper


A Tenaga
L.01 0.020 OH Pekerja
L.02 0.200 OH Tukang Cat
L.03 0.0200 OH Kepala Tukang
L.04 0.0025 OH Mandor
B Bahan
1.20 lbr Wall Paper
0.2 kg Lem

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

11 A.4.7.1.16 1 m2 Pengecatan Permukaan Baja dg Meni Besi


A Tenaga
L.01 0.02 OH Pekerja
L.02 0.2 OH Tukang Cat
L.03 0.002 OH Kepala Tukang
L.04 0.0025 OH Mandor
B Bahan
0.1 Kg Meni Besi
0.01 Kg Perekat / Lem
C PERALATAN
D Jumlah A + B + C

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

XIII A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN


E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

12 A.4.7.1.21 1 m2 Pengecatan Permukaan Baja dg Meni Besi & Perancah


A Tenaga
L.01 0.25 OH Pekerja
L.02 0.225 OH Tukang Cat
L.03 0.0225 OH Kepala Tukang
L.04 0.0075 OH Mandor
B Bahan
0.1 Kg Meni Besi
0.01 Kg Perekat / Lem
0.002 m3 Perancah Kayu
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

13 A.4.7.1.22 1 m2 Pengecatan kayu bidang kayu lama


A Tenaga
L.01 0.07 OH Pekerja
L.02 0.075 OH Tukang Cat
L.03 0.0075 OH Kepala Tukang
L.04 0.0025 OH Mandor
B Bahan
0.1 Kg Plamir
0.01 Kg Cat dasar
0.002 Kg Cat penutup
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

CK Boyolali
HARGA JUMLAH
AIAN PEKERJAAN BAHAN/UPAH
Rp Rp
EKERJAAN PENGECATAN
rokan Permukaan Cat Tembok Lama 8,531.44
6,395.85
41,400.00 6,210.00
61,950.00 185.85
1,360.00
27,200.00 1,360.00

7,755.85
10% 775.59
8,531.44

Kayu Baru (1 lp Plamur, 1 lp Cat dasar, 2 Lp Cat Penutu 44,439.01


4,001.10
41,400.00 2,898.00
57,850.00 520.65
66,100.00 396.60
61,950.00 185.85
36,398.00
28,900.00 5,780.00
13,200.00 1,980.00
62,800.00 10,676.00
62,800.00 16,328.00
7,400.00 74.00
14,000.00 420.00
5,700.00 1,140.00

40,399.10
10% 4,039.91
44,439.01

Kayu Baru (1 lp Plamuur, 1 lp Cat dasar, 3 Lp Cat Penut 56,619.75


9,422.50
41,400.00 2,898.00
57,850.00 6,074.25
66,100.00 264.40
61,950.00 185.85
42,050.00
28,900.00 5,780.00
13,200.00 1,980.00
62,800.00 10,676.00
62,800.00 21,980.00
7,400.00 74.00
14,000.00 420.00
5,700.00 1,140.00

51,472.50
10% 5,147.25
56,619.75

CK Boyolali
HARGA JUMLAH
AIAN PEKERJAAN BAHAN/UPAH
Rp Rp
EKERJAAN PENGECATAN

26,851.77
9,650.70
41,400.00 1,656.00
57,850.00 3,644.55
66,100.00 4,164.30
61,950.00 185.85
14,760.00
41,000.00 14,760.00

24,410.70
10% 2,441.07
26,851.77

CK Boyolali
HARGA JUMLAH
AIAN PEKERJAAN BAHAN/UPAH
Rp Rp
EKERJAAN PENGECATAN
43,721.32
6,370.45
41,400.00 1,656.00
57,850.00 3,471.00
66,100.00 1,057.60
61,950.00 185.85
33,376.20
42,100.00 6,315.00
42,100.00 15,661.20
5,700.00 11,400.00

39,746.65
10% 3,974.67
43,721.32

Kayu dg Cat Residu & Ter 10,660.87


4,511.70
41,400.00 4,140.00
61,950.00 371.70
5,180.00
14,800.00 5,180.00

9,691.70
10% 969.17
10,660.87

27,135.30
17,123.45
41,400.00 6,624.00
57,850.00 9,256.00
66,100.00 1,057.60
61,950.00 185.85
7,545.00
42,100.00 6,315.00
13,200.00 660.00
5,700.00 570.00

24,668.45
10% 2,466.85
27,135.30

Baru (1lap.Plamir, 1lap Cat Dasar 2 lap. Cat Penutup) 13,370.31


5,074.83
41,400.00 828.00
57,850.00 3,644.55
66,100.00 416.43
61,950.00 185.85
7,080.00

CK Boyolali
HARGA JUMLAH
AIAN PEKERJAAN BAHAN/UPAH
Rp Rp
EKERJAAN PENGECATAN
13,200.00 1,320.00
16,000.00 1,600.00
16,000.00 4,160.00

12,154.83
10% 1,215.48
13,370.31

k Lama (1lap.Plamir, 2lap Cat Penutup) 9,737.61


4,052.37
41,400.00 1,159.20
57,850.00 2,429.70
66,100.00 277.62
61,950.00 185.85
4,800.00
16,000.00 1,920.00
16,000.00 2,880.00

8,852.37
10% 885.24
9,737.61

64,916.36
13,874.88
41,400.00 828.00
57,850.00 11,570.00
66,100.00 1,322.00
61,950.00 154.88
45,140.00
35,000.00 42,000.00
15,700.00 3,140.00

59,014.88
10% 5,901.49
64,916.36

kaan Baja dg Meni Besi 17,123.78


12,685.08
41,400.00 828.00
57,850.00 11,570.00
66,100.00 132.20
61,950.00 154.88
2,882.00
27,250.00 2,725.00
15,700.00 157.00

15,567.08

CK Boyolali
HARGA JUMLAH
AIAN PEKERJAAN BAHAN/UPAH
Rp Rp
EKERJAAN PENGECATAN
10% 1,556.71
17,123.78

kaan Baja dg Meni Besi & Perancah 35,200.14


25,318.13
41,400.00 10,350.00
57,850.00 13,016.25
66,100.00 1,487.25
61,950.00 464.63
6,682.00
27,250.00 2,725.00
15,700.00 157.00
1,900,000.00 3,800.00

32,000.13
10% 3,200.01
35,200.14

10,957.07
7,887.38
41,400.00 2,898.00
57,850.00 4,338.75
66,100.00 495.75
61,950.00 154.88
2,073.60
13,200.00 1,320.00
62,800.00 628.00
62,800.00 125.60

9,960.98
10% 996.10
10,957.07

CK Boyolali
6.1.1

6.1.2

6.2
6.2.1

6.6.1 Bahan
0.08 Kg Dempul Jadi
0.02 Kg Minyak Cat
0.1 lbr Amplas

6.6.2 Tenaga
0.04 OH Pekerja
0.04 OH Tukang Cat
0.004 OH Kepala Tukang
0.0025 OH Mandor

6.7 1 m2 Pengecatan Bidang Lama


6.7.1 Bahan
0.15 Kg Plamir
0.17 Kg Cat Dasar
0.17 Kg Cat Penutup

6.7.2 Tenaga
0.07 OH Pekerja
0.075 OH Tukang Cat
0.0075 OH Kepala Tukang
0.0025 OH Mandor

6.8 1 m2 Pengecatan Bidang Kayu Baru (1 lap.Plamir)


1 lap.Cat Dasar & 2 lap.Cat Penutup
6.8.1 Bahan
0.2 Kg Cat Meni
0.15 Kg Plamir
0.17 Kg Cat Dasar
0.26 Kg Cat Penutup 2 kali

6.8.2 Tenaga
0.07 OH Pekerja
0.009 OH Tukang Cat
0.006 OH Kepala Tukang
0.0025 OH Mandor

CK Boyolali
6.9 1 m2 Pengecatan Bidang Kayu Baru (1 lap.Plamir)
1 lap.Cat Dasar & 3 lap.Cat Penutup
6.9.1 Bahan
0.2 Kg Cat Meni
0.15 Kg Plamir
0.17 Kg Cat Dasar
0.35 Kg Cat Penutup 2 kali

6.9.2 Tenaga
0.07 OH Pekerja
0.105 OH Tukang Cat
0.004 OH Kepala Tukang
0.0025 OH Mandor

CK Boyolali
6.10
6.10.1

6.10.2

6.11
6.11.1

6.11.2

6.12
6.12.1

6.12.2

6.13
6.13.1

6.14 1

6.14.2

CK Boyolali
6.15
6.15.1

6.15.2

6.20
6.20.1

6.20.2

CK Boyolali
6.21
6.21.1

6.21.2

6.24 1 m2 Pengecatan Permukaan Baja lapis Seng (Galvanis) secara


Manual sistem 3 lap. Cat Konvensional dg Tebal 200 μm
6.24.1 Bahan

CK Boyolali
is Seng (Galvanis) secara
sional dg Tebal 200 μm

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

XIV A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG


1 A.5.1.1.1 1 Unit Memasang Closet Duduk / Mono Blok
A Tenaga
L.01 3.3 OH Pekerja
L.02 1.1 OH Tukang Batu
L.03 0.010 OH Kepala Tukang
L.04 0.16 OH Mandor
Buah Bahan
1 Buah Kloset Duduk / Monoblok
0.06 Kelengkapan 6% dari harga Kloset
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
Overhead & Profit (contoh 10%)
2 A.5.1.1.2 1 Unit Memasang Closet Jongkok Porselen
A Tenaga
L.01 1 OH Pekerja
L.02 1.5 OH Tukang Batu
L.03 0.15 OH Kepala Tukang
L.04 0.16 OH Mandor
B Bahan
1 Buah Kloset Jongkok
6 Kg Portland Semen
0.01 m3 Pasir Pasang
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

3 A.5.1.1.4 1 Unit Memasang Urinoir


A Tenaga
L.01 1 OH Pekerja
L.02 1 OH Tukang Batu
L.03 0.10 OH Kepala Tukang
L.04 0.05 OH Mandor
B Bahan
1 Buah Urinoir
0.3 - Perlengkapan 30% Harga Urinoir
6 Kg Portland Semen
0.01 m3 Pasir Pasang
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

4 A.5.1.1.5 1 Unit Memasang Wastafel


A Tenaga
L.01 1.20 OH Pekerja

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

XIV A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG


L.02 1.45 OH Tukang Batu
L.03 0.15 OH Kepala Tukang
L.04 0.06 OH Mandor
B Bahan
1 Buah Wastafel
0.12 - Perlengkapan 12% Harga Wastafel
6 Kg Portland Semen
0.01 m3 Pasir Pasang
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

5 A.5.1.1.7a 1 Unit Pemasangan Bak Fibreglass vol.0,4 m3


A Tukang Batu
L.01 3 OH Pekerja
L.02 4.5 OH Tukang Batu
L.03 0.05 OH Kepala Tukang
L.04 0.9 OH Mandor
B Mandor
1 Buah Bak Fibreglass
0.12 - Perlengkapan 12% Bak Fibreglass
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

6 A.5.1.1.8 1 Unit Memasang Bak Mandi Batu Bata Vol. 0,30 m3


A Tenaga
L.01 6.00 OH Pekerja
L.02 3.00 OH Tukang Batu
L.03 0.30 OH Kepala Tukang
L.04 0.03 OH Mandor

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

XIV A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG


B Bahan
150.0 bh Batu Bata
120 Kg Portland Semen
0.3 m3 Pasir Pasang
109 buah Keramik 20 cm x 20 cm
6 Kg Semen Nat
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

7 A.5.1.1.14 1 m' Pemasangan Pipa Beton Ø 20 cm


A Tenaga
L.01 0.140 OH Pekerja
L.02 0.070 OH Tukang Batu
L.03 0.007 OH Kepala Tukang
L.04 0.007 OH Mandor
B Bahan
1.100 bh pipa beton
0.027 m3 Batu Bata
3.920 kg Portland Cement
0.056 m3 Pasir Pasang
0.024 m3 Pasir Urug
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

8 A.5.1.1.15 1 m' Pemasangan Pipa Beton Ø 100 cm


A Tenaga
L.01 0.380 OH Pekerja
L.02 0.190 OH Tukang Batu
L.03 0.019 OH Kepala Tukang
L.04 0.019 OH Mandor
B Bahan
1.10 bh pipa beton
0.55 m3 Batu Bata
10.300 kg Portland Cement
0.061 m3 Pasir Pasang
0.069 m3 Pasir Urug
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

9 A.5.1.1.16 1 bh Pemasangan Bak Kontrol Pas.Batu Bata 30x30 tinggi 35 cm


A Tenaga
L.01 2.160 OH Pekerja

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

XIV A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG


L.02 0.720 OH Tukang Batu
L.03 0.072 OH Kepala Tukang
L.04 0.011 OH Mandor
B Bahan
40.00 bh Batu Bata
44.00 kg Portland Cementd
0.07 m3 Pasir Pasang
0.06 m3 Pasir Beton
0.07 m3 Kerikil
1.60 kg Baja Tulangan
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

10 A.5.1.1.17 1 bh Pemasangan Bak Kontrol Pas.Batu Bata 45 x 45 tinggi 50 c


A Tenaga
L.01 3.200 OH Pekerja
L.02 1.150 OH Tukang Batu
L.03 0.011 OH Kepala Tukang
L.04 0.016 OH Mandor
B Bahan
70.00 bh Batu Bata
77.00 kg Portland Cementd
0.13 m3 Pasir Pasang
0.09 m3 Pasir Beton
0.02 m3 Kerikil
1.60 kg Baja Tulangan
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

XIV A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG


11 A.5.1.1.18 1 bh Pemasangan Bak Kontrol Pas.Batu Bata 60x60 tinggi 60 cm
A Tenaga
L.01 3.200 OH Pekerja
L.02 1.150 OH Tukang Batu
L.03 0.011 OH Kepala Tukang
L.04 0.016 OH Mandor
B Bahan
123.00 bh Batu Bata
114.00 kg Portland Cementd
0.18 m3 Pasir Pasang
0.12 m3 Pasir Beton
4.85 kg Baja Tulangan
0.03 m3 Kerikil
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

12 A.5.1.1.19 1 m' Pemasangan Pipa Galvanis Ø ½"


A Tenaga
L.01 0.054 OH Pekerja
L.02 0.090 OH Tukang Batu
L.03 0.009 OH Kepala Tukang
L.04 0.027 OH Mandor
B Bahan
1.20 m' Pipa Galvanis Ø ½"
0.35 Ls Perlengkapan 35% x pipa
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

13 A.5.1.1.20 1 m' Pemasangan Pipa Galvanis Ø ¾"


A Tenaga
L.01 0.054 OH Pekerja
L.02 0.090 OH Tukang Batu
L.03 0.009 OH Kepala Tukang
L.04 0.027 OH Mandor
B Bahan
1.20 m' Pipa Galvanis Ø ¾"
0.35 Ls Perlengkapan 35% x pipa
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

14 A.5.1.1.21 1 m' Pemasangan Pipa Galvanis Ø 1"


A Tenaga

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

XIV A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG


L.01 0.054 OH Pekerja
L.02 0.090 OH Tukang Batu
L.03 0.009 OH Kepala Tukang
L.04 0.027 OH Mandor
B Bahan
1.20 m' Pipa Galvanis Ø 1"
0.35 Ls Perlengkapan 35% x pipa
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

15 A.5.1.1.22 1 m' Pemasangan Pipa Galvanis Ø 1½ "


A Tenaga
L.01 0.108 OH Pekerja
L.02 0.180 OH Tukang Batu
L.03 0.018 OH Kepala Tukang
L.04 0.005 OH Mandor
B Bahan
1.20 m' Pipa Galvanis Ø 1½"
0.35 Ls Perlengkapan 35% x pipa
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

16 A.5.1.1.23 1 m' Pemasangan Pipa Galvanis Ø 3"


A Tenaga
L.01 0.135 OH Pekerja
L.02 0.225 OH Tukang Batu
L.03 0.023 OH Kepala Tukang
L.04 0.007 OH Mandor
B Bahan
1.20 m' Pipa Galvanis Ø 3"
0.35 Ls Perlengkapan 35% x pipa

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

XIV A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG


C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

17 A.5.1.1.24 1 m' Pemasangan Pipa Galvanis Ø 4"


A Tenaga
L.01 0.135 OH Pekerja
L.02 0.225 OH Tukang Batu
L.03 0.023 OH Kepala Tukang
L.04 0.007 OH Mandor
B Bahan
1.20 m' Pipa Galvanis Ø 4"
0.35 Ls Perlengkapan 35% x pipa
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

18 A.5.1.1.25 1 m' Pemasangan Pipa PVC tipe AW Ø ½"


A Tenaga
L.01 0.036 OH Pekerja
L.02 0.060 OH Tukang Batu
L.03 0.006 OH Kepala Tukang
L.04 0.002 OH Mandor
B Bahan
1.20 m' Pipa PVC Ø ½"
0.35 Ls Perlengkapan 35% x pipa
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

19 A.5.1.1.26 1 m' Pemasangan Pipa PVC tipe AW Ø ¾"


A Tenaga
L.01 0.036 OH Pekerja
L.02 0.060 OH Tukang Batu
L.03 0.006 OH Kepala Tukang
L.04 0.002 OH Mandor
B Bahan
1.20 m' Pipa PVC Ø ¾"
0.35 Ls Perlengkapan 35% x pipa
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

20 A.5.1.1.27 1 m' Pemasangan Pipa PVC tipe AW Ø 1"

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

XIV A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG


A Tenaga
L.01 0.036 OH Pekerja
L.02 0.060 OH Tukang Batu
L.03 0.006 OH Kepala Tukang
L.04 0.002 OH Mandor
B Bahan
1.20 m' Pipa PVC Ø 1"
0.35 Ls Perlengkapan 35% x pipa
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

21 A.5.1.1.28 1 m' Pemasangan Pipa PVC tipe AW Ø 1½"


A Tenaga
L.01 0.054 OH Pekerja
L.02 0.090 OH Tukang Batu
L.03 0.009 OH Kepala Tukang
L.04 0.003 OH Mandor
B Bahan
1.20 m' Pipa PVC Ø 1½"
0.35 Ls Perlengkapan 35% x pipa
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

22 A.5.1.1.29 1 m' Pemasangan Pipa PVC tipe AW Ø 2"


A Tenaga
L.01 0.054 OH Pekerja
L.02 0.090 OH Tukang Batu
L.03 0.009 OH Kepala Tukang
L.04 0.003 OH Mandor
B Bahan
1.20 m' Pipa PVC Ø 2"
0.35 Ls Perlengkapan 35% x pipa

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

XIV A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG


C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

23 A.5.1.1.32 1 m' Pemasangan Pipa PVC tipe AW Ø 4"


A Tenaga
L.01 0.081 OH Pekerja
L.02 0.135 OH Tukang Batu
L.03 0.135 OH Kepala Tukang
L.04 0.004 OH Mandor
B Bahan
1.20 m' Pipa PVC Ø 4"
0.35 Ls Perlengkapan 35% x pipa
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

24 A.5.1.1.33 1 buah Pemasangan Bak Cuci Piring


A Tenaga
L.01 0.030 OH Pekerja
L.02 0.300 OH Tukang Batu
L.03 0.030 OH Kepala Tukang
L.04 0.015 OH Mandor
B Bahan
1 unit Bak Cuci Piring
1 bh Water drain
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

25 A.5.1.1.35 1 bh Pemasangan Kran Ø ½" atau Ø ¾"


A Tenaga
L.01 0.010 OH Pekerja
L.02 0.400 OH Tukang Batu
L.03 0.040 OH Kepala Tukang
L.04 0.005 OH Mandor
B Bahan
1.00 bh Kran Air
0.0250 bh Sealtape
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

26 A.5.1.1.36 1 buah Pemasangan Floor Drain

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

XIV A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG


A Tenaga
L.01 0.010 OH Pekerja
L.02 0.100 OH Tukang Batu
L.03 0.010 OH Kepala Tukang
L.04 0.005 OH Mandor
B Bahan
1 bh Floor Drain

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

27 A.5.1.1.37 1 m1 Pas. Buis beton dia 20 cm dengan rolag bata 1 : 4 (rolag pen
A Bahan
0.063 Urugan pasir : 0.1 x 0.7 x 0.9
1.41435 Pas. Bata 1: 4 : 3.143 x 0.45 x 1
1 Pas. Buis beton Ø 20 cm : 1 buah
B Tenaga
0.63 Galian tanah : 0.7 x 0.9 x 1
0.21 Urugan kembali : 1/3 x 0.7 x 0.9 x 1
0.063 Urugan pasir : 0.1 x 0.7 x 0.9
1.41435 Pas. Bata 1: 4 : 3.143 x 0.45 x 1
1 Pas. Buis beton Ø 20 cm : 1 buah
0.42 Pembuangan tanah : 2/3 x 0.7 x 0.9 x 1
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

28 A.5.1.1.38 1 m1 Pas. Buis beton dia 30 cm dengan rolag bata 1 : 4 (rolag pen
A Bahan
0.08 Urugan pasir : 0.1 x 0.8 x 1
1.72865 Pas. Bata 1: 4 : 3.143 x 0.55 x 1
1 Pas. Buis beton Ø 30 cm : 1 buah
B Tenaga
0.8 Galian tanah : 0.8 x 1 x 1
0.266667 Urugan kembali : 1/3 x 0.8 x 1 x 1
0.08 Urugan pasir : 0.1 x 0.8 x 1
1.72865 Pas. Bata 1: 4 : 3.143 x 0.55 x 1
1 Pas. Buis beton Ø 30 cm : 1 buah
0.533333 Pembuangan tanah : 2/3 x 0.8 x 1 x 1
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

29 A.5.1.1.39 1 m1 Pas. Buis beton dia 40 cm dengan rolag bata 1 : 4 (rolag pen

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

XIV A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG


A Bahan
0.09 Urugan pasir : 0.1 x 0.9 x 1
2.04295 Pas. Bata 1: 4 : 3.143 x 0.65 x 1
1 Pas. Buis beton Ø 40 cm : 1 buah
B Tenaga
0.99 Galian tanah : 0.9 x 1.1 x 1
0.33 Urugan kembali : 1/3 x 0.9 x 1.1 x 1
0.09 Urugan pasir : 0.1 x 0.9 x 1
2.04295 Pas. Bata 1: 4 : 3.143 x 0.65 x 1
1 Pas. Buis beton Ø 40 cm : 1 buah
0.6 Pembuangan tanah : 2/3 x 0.9 x 1 x 1
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

30 A.5.1.1.40 1 m1 Pas. Buis beton dia 50 cm dengan rolag bata 1 : 4 (rolag pen
A Bahan
0.1 Urugan pasir : 0.1 x 1 x 1
2.35725 Pas. Bata 1: 4 : 3.143 x 0.75 x 1
1 Pas. Buis beton Ø 50 cm : 1 buah
B Tenaga
1.2 Galian tanah : 1 x 1.2 x 1
0.4 Urugan kembali : 1/3 x 1 x 1.2 x 1
0.1 Urugan pasir : 0.1 x 1 x 1
2.35725 Pas. Bata 1: 4 : 3.143 x 0.75 x 1
1 Pas. Buis beton Ø 50 cm : 1 buah
0.6 Pembuangan tanah : 2/3 x 0.9 x 1 x 1
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

31 A.5.1.1.41 1 m1 Pas. Buis beton dia 60 cm dengan rolag bata 1 : 4 (rolag pen
A Bahan
0.11 Urugan pasir : 0.1 x 1.1 x 1
2.67155 Pas. Bata 1: 4 : 3.143 x 0.85 x 1
1 Pas. Buis beton Ø 60 cm : 1 buah
B Tenaga
1.43 Galian tanah : 1.1 x 1.3 x 1
0.476667 Urugan kembali : 1/3 x 1.1 x 1.3 x 1
0.11 Urugan pasir : 0.1 x 1.1 x 1
2.67155 Pas. Bata 1: 4 : 3.143 x 0.85 x 1
1 Pas. Buis beton Ø 60 cm : 1 buah
0.953333 Pembuangan tanah : 2/3 x 1.1 x 1.3 x 1
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

XIV A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG


F Harga Satuan Pekerjaan (D+E)

32 A.5.1.1.42 1 m1 Pas. Buis beton dia 80 cm dengan rolag bata 1 : 4 (rolag pen
A Bahan
0.13 Urugan pasir : 0.1 x 1.3 x 1
3.30015 Pas. Bata 1: 4 : 3.143 x 1.05 x 1
2 Pas. Buis beton Ø 80 cm : 2 buah
B Tenaga
1.82 Galian tanah : 1.3 x 1.4 x 1
0.606667 Urugan kembali : 1/3 x 1.3 x 1.4 x 1
0.13 Urugan pasir : 0.1 x 1.3 x 1
3.30015 Pas. Bata 1: 4 : 3.143 x 1.05 x 1
2 Pas. Buis beton Ø 80 cm : 2 buah
1.213333 Pembuangan tanah : 2/3 x 1.3 x 1.4 x 1
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

33 A.5.1.1.43 1 m1 Pas. Buis beton dia 20 cm dengan cincin bata 1 : 4 (rolag pe


A Bahan
0.06 Urugan pasir : 0.1 x 0.6 x 1
0.424305 Pas. Bata 1: 4 : 3.143 x 0.45 x 0.3
1 Pas. Buis beton Ø 20 cm : 1 buah
B Tenaga
0.42 Galian tanah : 0.6 x 0.7 x 1
0.14 Urugan kembali : 1/3 x 0.6 x 0.7 x 1
0.06 Urugan pasir : 0.1 x 0.6 x 1
0.424305 Pas. Bata 1: 4 : 3.143 x 0.45 x 0.3
1 Pas. Buis beton Ø 20 cm : 1 buah
0.28 Pembuangan tanah : 2/3 x 0.6 x 0.7 x 1
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

34 A.5.1.1.44 1 m1 Pas. Buis beton dia 30 cm dengan cincin bata 1 : 4 (rolag pe


A Bahan
0.07 Urugan pasir : 0.1 x 0.7 x 1
0.518595 Pas. Bata 1: 4 : 3.143 x 0.55 x 0.3
1 Pas. Buis beton Ø 30 cm : 1 buah
B Tenaga
0.56 Galian tanah : 0.7 x 0.8 x 1
0.186667 Urugan kembali : 1/3 x 0.7 x 0.8 x 1
0.07 Urugan pasir : 0.1 x 0.7 x 1
0.518595 Pas. Bata 1: 4 : 3.143 x 0.55 x 0.3
1 Pas. Buis beton Ø 30 cm : 1 buah
0.373333 Pembuangan tanah : 2/3 x 0.7 x 0.8 x 1

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

XIV A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG


C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

35 A.5.1.1.45 1 m1 Pas. Buis beton dia 40 cm dengan cincin bata 1 : 4 (rolag pe


A Bahan
0.08 Urugan pasir : 0.1 x 0.8 x 1
0.612885 Pas. Bata 1: 4 : 3.143 x 0.65 x 0.3
1 Pas. Buis beton Ø 40 cm : 1 buah
B Tenaga
0.72 Galian tanah : 0.8 x 0.9 x 1
0.24 Urugan kembali : 1/3 x 0.8 x 0.9 x 1
0.08 Urugan pasir : 0.1 x 0.8 x 1
0.612885 Pas. Bata 1: 4 : 3.143 x 0.65 x 0.3
1 Pas. Buis beton Ø 40 cm : 1 buah
0.48 Pembuangan tanah : 2/3 x 0.8 x 0.9 x 1
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

36 A.5.1.1.46 1 m1 Pas. Buis beton dia 50 cm dengan cincin bata 1 : 4 (rolag pe


A Bahan
0.08 Urugan pasir : 0.1 x 0.8 x 1
0.707175 Pas. Bata 1: 4 : 3.143 x 0.65 x 0.3
1 Pas. Buis beton Ø 40 cm : 1 buah
B Tenaga
0.9 Galian tanah : 0.9 x 1 x 1
0.3 Urugan kembali : 1/3 x 0.9 x 1 x 1
0.09 Urugan pasir : 0.1 x 0.9 x 1
0.707175 Pas. Bata 1: 4 : 3.143 x 0.75 x 0.3
1 Pas. Buis beton Ø 50 cm : 1 buah
0.6 Pembuangan tanah : 2/3 x 0.9 x 1 x 1
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

37 A.5.1.1.47 1 m1 Pas. Buis beton dia 60 cm dengan cincin bata 1 : 4 (rolag pe


A Bahan
0.1 Urugan pasir : 0.1 x 1 x 1
0.801465 Pas. Bata 1: 4 : 3.143 x 0.85 x 0.3
1 Pas. Buis beton Ø 60 cm : 1 buah
B Tenaga
1.1 Galian tanah : 1 x 1.1 x 1
0.366667 Urugan kembali : 1/3 x 1 x 1.1 x 1
0.1 Urugan pasir : 0.1 x 1 x 1

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

XIV A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG


0.801465 Pas. Bata 1: 4 : 3.143 x 0.85 x 0.3
1 Pas. Buis beton Ø 60 cm : 1 buah
0.733333 Pembuangan tanah : 2/3 x 1 x 1.1 x 1
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

38 A.5.1.1.48 1 m1 Pas. Buis beton U 20 cm dengan cincin bata bata 1 : 4


A Bahan
0.06 Urugan pasir : 0.1 x 0.6 x 1
0.2133 Pas. Bata 1: 4 : 1.58 x 0.45 x 0.3
1 Pas. Buis beton U 20 cm : 1 buah
B Tenaga
0.24 Galian tanah : 0.6 x 0.4 x 1
0.08 Urugan kembali : 1/3 x 0.6 x 0.4 x 1
0.06 Urugan pasir : 0.1 x 0.6 x 1
0.2133 Pas. Bata 1: 4 : 1.58 x 0.45 x 0.3
1 Pas. Buis beton U 20 cm : 1 buah
0.16 Pembuangan tanah : 2/3 x 0.6 x 0.4 x 1
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

39 A.5.1.1.49 1 m1 Pas. Buis beton U 30 cm dengan cincin bata bata 1 : 4


A Bahan
0.07 Urugan pasir : 0.1 x 0.7 x 1
0.13035 Pas. Bata 1: 4 : 1.58 x 0.55 x 0.15
1 Pas. Buis beton U 30 cm : 1 buah
B Tenaga
0.315 Galian tanah : 0.7 x 0.45 x 1
0.105 Urugan kembali : 1/3 x 0.7 x 0.45 x 1
0.07 Urugan pasir : 0.1 x 0.7 x 1
0.13035 Pas. Bata 1: 4 : 1.58 x 0.55 x 0.15
1 Pas. Buis beton U 30 cm : 1 buah
0.21 Pembuangan tanah : 2/3 x 0.7 x 0.45 x 1
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

Diperiksa,
KEPALA BIDANG CIPTA KARYA

CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

XIV A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG

Ir. SUHARTONO, MT.


Pembina
NIP. 19600305 199203 1 007
Mengetahui
KEPALA DINAS PEKERJAAN UMUM
KABUPATEN SUKOHARJO

Ir. ACHMAD HUFRONI, MT


Pembina Tingkat I
NIP. 19581120 199103 1 004

CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
SANITASI DALAM GEDUNG
1,353,486.20
210,828.00
41,400.00 136,620.00
57,850.00 63,635.00
66,100.00 661.00
61,950.00 9,912.00
1,019,614.00
961,900.00 961,900.00
961,900.00 57,714.00

1,230,442.00
10% 123,044.20
1,353,486.20

311,824.70
148,002.00
41,400.00 41,400.00
57,850.00 86,775.00
66,100.00 9,915.00
61,950.00 9,912.00
135,475.00
125,600.00 125,600.00
1,337.50 8,025.00
185,000.00 1,850.00

283,477.00
10% 28,347.70
311,824.70

1,776,931.75
108,957.50
41,400.00 41,400.00
57,850.00 57,850.00
66,100.00 6,610.00
61,950.00 3,097.50
1,506,435.00
1,151,200.00 1,151,200.00
1,151,200.00 345,360.00
1,337.50 8,025.00
185,000.00 1,850.00

1,615,392.50
10% 161,539.25
1,776,931.75

495,437.25
147,194.50
41,400.00 49,680.00

CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
SANITASI DALAM GEDUNG
57,850.00 83,882.50
66,100.00 9,915.00
61,950.00 3,717.00
303,203.00
261,900.00 261,900.00
261,900.00 31,428.00
1,337.50 8,025.00
185,000.00 1,850.00

450,397.50
10% 45,039.75
495,437.25

810,604.30
443,585.00
41,400.00 124,200.00
57,850.00 260,325.00
66,100.00 3,305.00
61,950.00 55,755.00
293,328.00
261,900.00 261,900.00
261,900.00 31,428.00

736,913.00
10% 73,691.30
810,604.30

1,058,336.95
443,638.50
41,400.00 248,400.00
57,850.00 173,550.00
66,100.00 19,830.00
61,950.00 1,858.50

CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
SANITASI DALAM GEDUNG
518,486.00
650.00 97,500.00
0.11 1,337.50 160,500.00
0.0121 185,000.00 55,500.00
82.6446280992 1,784.00 194,456.00
1,755.00 10,530.00

962,124.50
10% 96,212.45
1,058,336.95

79,202.59
10,741.85
41,400.00 5,796.00
57,850.00 4,049.50
66,100.00 462.70
61,950.00 433.65
61,260.50
27,250.00 29,975.00
487,500.00 13,162.50
1,337.50 5,243.00
185,000.00 10,360.00
105,000.00 2,520.00

72,002.35
10% 7,200.24
79,202.59

640,483.47
29,156.45
41,400.00 15,732.00
57,850.00 10,991.50
66,100.00 1,255.90
61,950.00 1,177.05
553,101.25
229,700.00 252,670.00
487,500.00 268,125.00
1,337.50 13,776.25
185,000.00 11,285.00
105,000.00 7,245.00

582,257.70
10% 58,225.77
640,483.47

Batu Bata 30x30 tinggi 35 cm 303,420.32


136,516.65
41,400.00 89,424.00

CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
SANITASI DALAM GEDUNG
57,850.00 41,652.00
66,100.00 4,759.20
61,950.00 681.45
139,320.00
650.00 26,000.00
1,337.50 58,850.00
185,000.00 12,950.00
185,000.00 11,100.00
206,000.00 14,420.00
10,000.00 16,000.00

275,836.65
10% 27,583.67
303,420.32

Batu Bata 45 x 45 tinggi 50 cm 451,036.63


200,725.80
41,400.00 132,480.00
57,850.00 66,527.50
66,100.00 727.10
61,950.00 991.20
209,307.50
650.00 45,500.00
1,337.50 102,987.50
185,000.00 24,050.00
185,000.00 16,650.00
206,000.00 4,120.00
10,000.00 16,000.00

410,033.30
10% 41,003.33
451,036.63

CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
SANITASI DALAM GEDUNG
Batu Bata 60x60 tinggi 60 cm 599,157.68
200,725.80
41,400.00 132,480.00
57,850.00 66,527.50
66,100.00 727.10
61,950.00 991.20
343,963.00
650.00 79,950.00
1,337.50 152,475.00
185,000.00 34,040.00
185,000.00 22,200.00
10,000.00 48,500.00
206,000.00 6,798.00

544,688.80
10% 54,468.88
599,157.68

35,914.62
9,709.65
41,400.00 2,235.60
57,850.00 5,206.50
66,100.00 594.90
61,950.00 1,672.65
22,940.00
14,800.00 17,760.00
14,800.00 5,180.00

32,649.65
10% 3,264.97
35,914.62

41,541.12
9,709.65
41,400.00 2,235.60
57,850.00 5,206.50
66,100.00 594.90
61,950.00 1,672.65
28,055.00
18,100.00 21,720.00
18,100.00 6,335.00

37,764.65
10% 3,776.47
41,541.12

57,056.62
9,709.65

CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
SANITASI DALAM GEDUNG
41,400.00 2,235.60
57,850.00 5,206.50
66,100.00 594.90
61,950.00 1,672.65
42,160.00
27,200.00 32,640.00
27,200.00 9,520.00

51,869.65
10% 5,186.97
57,056.62

99,691.63
16,383.75
41,400.00 4,471.20
57,850.00 10,413.00
66,100.00 1,189.80
61,950.00 309.75
74,245.00
47,900.00 57,480.00
47,900.00 16,765.00

90,628.75
10% 9,062.88
99,691.63

183,226.12
20,559.20
41,400.00 5,589.00
57,850.00 13,016.25
66,100.00 1,520.30
61,950.00 433.65
146,010.00
94,200.00 113,040.00
94,200.00 32,970.00

CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
SANITASI DALAM GEDUNG

166,569.20
10% 16,656.92
183,226.12

259,269.12
20,559.20
41,400.00 5,589.00
57,850.00 13,016.25
66,100.00 1,520.30
61,950.00 433.65
215,140.00
138,800.00 166,560.00
138,800.00 48,580.00

235,699.20
10% 23,569.92
259,269.12

12,338.59
5,481.90
41,400.00 1,490.40
57,850.00 3,471.00
66,100.00 396.60
61,950.00 123.90
5,735.00
3,700.00 4,440.00
3,700.00 1,295.00

11,216.90
10% 1,121.69
12,338.59

14,810.84
5,481.90
41,400.00 1,490.40
57,850.00 3,471.00
66,100.00 396.60
61,950.00 123.90
7,982.50
5,150.00 6,180.00
5,150.00 1,802.50

13,464.40
10% 1,346.44
14,810.84

18,348.72

CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
SANITASI DALAM GEDUNG
5,481.90
41,400.00 1,490.40
57,850.00 3,471.00
66,100.00 396.60
61,950.00 123.90
11,198.75
7,225.00 8,670.00
7,225.00 2,528.75

16,680.65
10% 1,668.07
18,348.72

19,573.51
8,222.85
41,400.00 2,235.60
57,850.00 5,206.50
66,100.00 594.90
61,950.00 185.85
9,571.25
6,175.00 7,410.00
6,175.00 2,161.25

17,794.10
10% 1,779.41
19,573.51

29,803.51
8,222.85
41,400.00 2,235.60
57,850.00 5,206.50
66,100.00 594.90
61,950.00 185.85
18,871.25
12,175.00 14,610.00
12,175.00 4,261.25

CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
SANITASI DALAM GEDUNG

27,094.10
10% 2,709.41
29,803.51

87,498.90
20,334.45
41,400.00 3,353.40
57,850.00 7,809.75
66,100.00 8,923.50
61,950.00 247.80
59,210.00
38,200.00 45,840.00
38,200.00 13,370.00

79,544.45
10% 7,954.45
87,498.90

332,210.18
21,509.25
41,400.00 1,242.00
57,850.00 17,355.00
66,100.00 1,983.00
61,950.00 929.25
280,500.00
230,500.00 230,500.00
50,000.00 50,000.00

302,009.25
10% 30,200.93
332,210.18

51,029.28
26,507.75
41,400.00 414.00
57,850.00 23,140.00
66,100.00 2,644.00
61,950.00 309.75
19,882.50
19,800.00 19,800.00
3,300.00 82.50

46,390.25
10% 4,639.03
51,029.28

11,516.73

CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
SANITASI DALAM GEDUNG
7,169.75
41,400.00 414.00
57,850.00 5,785.00
66,100.00 661.00
61,950.00 309.75
3,300.00
3,300.00 3,300.00

10,469.75
10% 1,046.98
11,516.73

gan rolag bata 1 : 4 (rolag penuh) 212,501.09


132,546.55
126,000.00 7,938.00
68,836.25 97,358.55
27,250.00 27,250.00
60,636.26
32,598.75 20,537.21
10,866.25 2,281.91
13,039.50 821.49
19,795.25 27,997.41
3,000.00 3,000.00
14,281.50 5,998.23

193,182.81
10% 19,318.28
212,501.09

gan rolag bata 1 : 4 (rolag penuh) 270,632.42


171,173.78
126,000.00 10,080.00
68,836.25 118,993.78
42,100.00 42,100.00
74,855.69
32,598.75 26,079.00
10,866.25 2,897.67
13,039.50 1,043.16
19,795.25 34,219.06
3,000.00 3,000.00
14,281.50 7,616.80

246,029.47
10% 24,602.95
270,632.42

gan rolag bata 1 : 4 (rolag penuh) 322,311.88

CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
SANITASI DALAM GEDUNG
203,969.02
126,000.00 11,340.00
68,836.25 140,629.02
52,000.00 52,000.00
89,041.79
32,598.75 32,272.76
10,866.25 3,585.86
13,039.50 1,173.56
19,795.25 40,440.71
3,000.00 3,000.00
14,281.50 8,568.90

293,010.80
10% 29,301.08
322,311.88

gan rolag bata 1 : 4 (rolag penuh) 391,615.90


252,514.25
126,000.00 12,600.00
68,836.25 162,264.25
77,650.00 77,650.00
103,500.20
32,598.75 39,118.50
10,866.25 4,346.50
13,039.50 1,303.95
19,795.25 46,662.35
3,500.00 3,500.00
14,281.50 8,568.90

356,014.45
10% 35,601.45
391,615.90

gan rolag bata 1 : 4 (rolag penuh) 480,907.52


313,459.48
126,000.00 13,860.00
68,836.25 183,899.48
115,700.00 115,700.00
123,729.17
32,598.75 46,616.21
10,866.25 5,179.58
13,039.50 1,434.35
19,795.25 52,884.00
4,000.00 4,000.00
14,281.50 13,615.03

437,188.65
10% 43,718.87

CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
SANITASI DALAM GEDUNG
480,907.52

gan rolag bata 1 : 4 (rolag penuh) 616,904.77


400,549.95
126,000.00 16,380.00
68,836.25 227,169.95
78,500.00 157,000.00
160,272.57
32,598.75 59,329.73
10,866.25 6,592.19
13,039.50 1,695.14
19,795.25 65,327.29
5,000.00 10,000.00
14,281.50 17,328.22

560,822.52
10% 56,082.25
616,904.77

gan cincin bata 1 : 4 (rolag penuh) 104,951.80


64,017.57
126,000.00 7,560.00
68,836.25 29,207.57
27,250.00 27,250.00
31,393.16
32,598.75 13,691.48
10,866.25 1,521.28
13,039.50 782.37
19,795.25 8,399.22
3,000.00 3,000.00
14,281.50 3,998.82

95,410.73
10% 9,541.07
104,951.80

gan cincin bata 1 : 4 (rolag penuh) 139,053.25


86,618.14
126,000.00 8,820.00
68,836.25 35,698.14
42,100.00 42,100.00
39,793.91
32,598.75 18,255.30
10,866.25 2,028.37
13,039.50 912.77
19,795.25 10,265.72
3,000.00 3,000.00
14,281.50 5,331.76

CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
SANITASI DALAM GEDUNG

126,412.04
10% 12,641.20
139,053.25

gan cincin bata 1 : 4 (rolag penuh) 168,716.02


104,268.71
126,000.00 10,080.00
68,836.25 42,188.71
52,000.00 52,000.00
49,109.49
32,598.75 23,471.10
10,866.25 2,607.90
13,039.50 1,043.16
19,795.25 12,132.21
3,000.00 3,000.00
14,281.50 6,855.12

153,378.20
10% 15,337.82
168,716.02

gan cincin bata 1 : 4 (rolag penuh) 215,874.10


136,409.28
126,000.00 10,080.00
68,836.25 48,679.28
77,650.00 77,650.00
59,839.91
32,598.75 29,338.88
10,866.25 3,259.88
13,039.50 1,173.56
19,795.25 13,998.71
3,500.00 3,500.00
14,281.50 8,568.90

196,249.19
10% 19,624.92
215,874.10

gan cincin bata 1 : 4 (rolag penuh) 280,450.51


183,469.85
126,000.00 12,600.00
68,836.25 55,169.85
115,700.00 115,700.00
71,485.17
32,598.75 35,858.63
10,866.25 3,984.29
13,039.50 1,303.95

CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
SANITASI DALAM GEDUNG
19,795.25 15,865.20
4,000.00 4,000.00
14,281.50 10,473.10

254,955.01
10% 25,495.50
280,450.51

an cincin bata bata 1 : 4 85,663.06


59,392.77
126,000.00 7,560.00
68,836.25 14,682.77
37,150.00 37,150.00
18,482.74
32,598.75 7,823.70
10,866.25 869.30
13,039.50 782.37
19,795.25 4,222.33
2,500.00 2,500.00
14,281.50 2,285.04

77,875.51
10% 7,787.55
85,663.06

an cincin bata bata 1 : 4 94,374.01


64,892.81
126,000.00 8,820.00
68,836.25 8,972.81
47,100.00 47,100.00
20,901.75
32,598.75 10,268.61
10,866.25 1,140.96
13,039.50 912.77
19,795.25 2,580.31
3,000.00 3,000.00
14,281.50 2,999.12

85,794.56
10% 8,579.46
94,374.01

Sukoharjo, 2015

Direncana
KASI BINA TEKNIS

BIDANG CIPTA KARYA

CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
SANITASI DALAM GEDUNG

Ir. JOKO PRASENO


NIP. 19670209 199803 1 004

AS PEKERJAAN UMUM
ATEN SUKOHARJO

AD HUFRONI, MT

1120 199103 1 004

CK Boyolali
0.9922
0.0121 360 4.356
0.04 109 4.36 25
108.9

CK Boyolali
233,751.20

CK Boyolali
115,446.98

CK Boyolali
280,450.51
183,469.85
12,600.00
55,169.85
115,700.00
71,485.17
35,858.63
3,984.29
1,303.95

CK Boyolali
15,865.20
4,000.00
10,473.10

254,955.01
25,495.50
280,450.51

CK Boyolali
HARGA JUMLAH
No. KOEF SAT. 0 BAHAN/UPAH
Rp Rp
HARGA SATUAN PEKERJAAN BEGESTING
1 1 m2 Memasang Bekisting untuk Pondasi 76,374.80
A Tenaga 39,898.30
0.52 OH Pekerja 41,400.00 21,528.00
0.26 OH Tukang Kayu 57,850.00 15,041.00
0.03 OH Kepala Tukang 66,100.00 1,718.60
0.03 OH Mandor 61,950.00 1,610.70
B Bahan 29,533.33
0.01 m3 Kayu Klas III 1,900,000.00 25,333.33
0.20 Kg Paku Biasa 2" - 5" 14,000.00 2,800.00
0.10 Ltr Minyak Bekisting 14,000.00 1,400.00
C PERALATAN
D Jumlah A + B + C 69,431.63
E Overhead & Profit 10% 6,943.16
F Harga Satuan Pekerjaan (D+E) 76,374.80

2 1 m2 Memasang Bekisting untuk Sloof 79,858.13


A Tenaga 39,898.30
0.52 OH Pekerja 41,400.00 21,528.00
0.26 OH Tukang Kayu 57,850.00 15,041.00
0.03 OH Kepala Tukang 66,100.00 1,718.60
0.03 OH Mandor 61,950.00 1,610.70
B Bahan 32,700.00
0.02 m3 Kayu Klas III 1,900,000.00 28,500.00
0.20 Kg Paku Biasa 2" - 5" 14,000.00 2,800.00
0.10 Ltr Minyak Bekisting 14,000.00 1,400.00
C PERALATAN
D Jumlah A + B + C 72,598.30
E Overhead & Profit 10% 7,259.83
F Harga Satuan Pekerjaan (D+E) 79,858.13

3 1 m2 Memasang Bekisting untuk Kolom 145,225.83


A Tenaga 50,640.15
0.66 OH Pekerja 41,400.00 27,324.00
0.33 OH Tukang Kayu 57,850.00 19,090.50
0.03 OH Kepala Tukang 66,100.00 2,181.30
0.03 OH Mandor 61,950.00 2,044.35
B Bahan 81,383.33
0.01 m3 Kayu Klas III 1,900,000.00 25,333.33
0.27 Kg Paku Biasa 2" - 5" 14,000.00 3,733.33
0.20 Ltr Minyak Bekisting 14,000.00 2,800.00
0.01 m3 Balok Kayu Klas II 5,600,000.00 28,000.00
0.12 Lbr Plywood tebal 9mm 109,000.00 12,716.67
0.67 Btg Bambu 13,200.00 8,800.00
C PERALATAN
D Jumlah A + B + C 132,023.48
E Overhead & Profit 10% 13,202.35
F Harga Satuan Pekerjaan (D+E) 145,225.83

4 1 m2 Memasang Bekisting untuk Balok 151,385.83


A Tenaga 50,640.15
0.66 OH Pekerja 41,400.00 27,324.00
0.33 OH Tukang Kayu 57,850.00 19,090.50
0.03 OH Kepala Tukang 66,100.00 2,181.30
0.03 OH Mandor 61,950.00 2,044.35
B Bahan 86,983.33
0.01 m3 Kayu Klas III 1,900,000.00 25,333.33
0.27 Kg Paku Biasa 2" - 5" 14,000.00 3,733.33
0.20 Ltr Minyak Bekisting 14,000.00 2,800.00
0.01 m3 Balok Kayu Klas II 5,600,000.00 33,600.00
0.12 Lbr Plywood tebal 9mm 109,000.00 12,716.67
0.67 Btg Bambu 13,200.00 8,800.00
C PERALATAN
D Jumlah A + B + C 137,623.48
E Overhead & Profit 10% 13,762.35
F Harga Satuan Pekerjaan (D+E) 151,385.83

5 1 m2 Memasang Bekisting untuk Lantai 370,029.17

CK Boyolali
A Tenaga 50,640.15
0.66 OH Pekerja 41,400.00 27,324.00
0.33 OH Tukang Kayu 57,850.00 19,090.50
0.03 OH Kepala Tukang 66,100.00 2,181.30
0.03 OH Mandor 61,950.00 2,044.35
B Bahan 285,750.00
0.04 m3 Kayu Klas III 1,900,000.00 76,000.00
0.40 Kg Paku Biasa 2" - 5" 14,000.00 5,600.00
0.20 Ltr Minyak Bekisting 14,000.00 2,800.00
0.02 m3 Balok Kayu Klas II (Borneo) 5,600,000.00 84,000.00
0.35 Lbr Plywood tebal 9mm 109,000.00 38,150.00
6.00 Btg Bambu 13,200.00 79,200.00
C PERALATAN
D Jumlah A + B + C 336,390.15
E Overhead & Profit 10% 33,639.02
F Harga Satuan Pekerjaan (D+E) 370,029.17

6 1 m2 Memasang Bekisting untuk Dinding 221,116.67


A Tenaga 50,640.15
0.66 OH Pekerja 41,400.00 27,324.00
0.33 OH Tukang Kayu 57,850.00 19,090.50
0.03 OH Kepala Tukang 66,100.00 2,181.30
0.03 OH Mandor 61,950.00 2,044.35
B Bahan 150,375.00
0.02 m3 Kayu Klas III 1,900,000.00 28,500.00
0.30 Kg Paku Biasa 2" - 5" 14,000.00 4,200.00
0.20 Ltr Minyak Bekisting 14,000.00 2,800.00
0.01 m3 Balok Kayu Klas II 5,600,000.00 56,000.00
0.18 Lbr Plywood tebal 9mm 109,000.00 19,075.00
1.50 Btg Bambu 13,200.00 19,800.00
4.00 Buah Formite/Penjaga jarak / Spacer (alat bantu) 5,000.00 20,000.00
C PERALATAN
D Jumlah A + B + C 201,015.15
E Overhead & Profit 10% 20,101.52
F Harga Satuan Pekerjaan (D+E) 221,116.67

7 1 m2 Memasang Bekisting untuk Tangga 175,686.67


A Tenaga 50,640.15
0.66 OH Pekerja 41,400.00 27,324.00
0.33 OH Tukang Kayu 57,850.00 19,090.50
0.03 OH Kepala Tukang 66,100.00 2,181.30
0.03 OH Mandor 61,950.00 2,044.35
B Bahan 109,075.00
0.02 m3 Kayu Klas III 1,900,000.00 28,500.00
0.30 Kg Paku Biasa 2" - 5" 14,000.00 4,200.00
0.15 Ltr Minyak Bekisting 14,000.00 2,100.00
0.01 m3 Balok Kayu Klas II 5,600,000.00 42,000.00
0.18 Lbr Plywood tebal 9mm 109,000.00 19,075.00
1.00 Btg Bambu 13,200.00 13,200.00
C PERALATAN
D Jumlah A + B + C 159,715.15
E Overhead & Profit 10% 15,971.52
F Harga Satuan Pekerjaan (D+E) 175,686.67

CK Boyolali
No. KOEF SAT. URAIAN PEKERJAAN

HARGA SATUAN PEKERJAAN PEMINDAHAN TANAMAN


1 1 BTG Memindahkan Tanaman Sedang (dalam satu area)
A TENAGA
2.00 OH Pekerja
1.00 OH Mandor
B BAHAN
1.20 m3 Air
0.50 m3 Tanah Subur
1.00 btg Bambu penegak
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)

2 1 BTG Memindahkan Tanaman Kecil (dalam satu area)


A TENAGA
0.50 OH Pekerja
0.250 OH Mandor
B BAHAN
0.600 m3 Air
0.25 m3 Tanah Subur
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)

CK Boyolali
HARGA JUMLAH
BAHAN/UPAH
Rp Rp

Err:509
144,750.00
41,400.00 82,800.00
61,950.00 61,950.00
Err:509
72,500.00 87,000.00
Err:509 Err:509
13,200.00 13,200.00

Err:509
Err:509
Err:509

Err:509
36,187.50
41,400.00 20,700.00
61,950.00 15,487.50
Err:509
72,500.00 43,500.00
Err:509 Err:509

Err:509
Err:509
Err:509

CK Boyolali

Anda mungkin juga menyukai