PEKERJAAN : -
LOKASI : -
TAHUN ANGGARAN : -
HARGA
NO. J E N I S B A H A N SATUAN (Rp)
I BAHAN DASAR
1 BATU KALI Bulat Utuh m3
Bulat Belah m3 190,000
Pecah 10/15 m3 190,000
Pecah 5/7 m3 200,000
Pecah 3/5 m3 198,300
2 KERIKIL Timbunan Pilihan m3 114,000
Sawur / Koral m3 84,200
Beton 0,5/1 m3 101,600
Beton 1/2 m3 214,850
Beton 2/3 m3 206,000
Biasa m3
Tras Giling m3
3 BATU BATA ex lokal bh 650
Concrete Blok (CB 15) / Batako (Lubang2) bh
Batako Padat bh
Rosteer beton cetak 12 x 11 x 24 cm bh
Rosteer tanah liat bakar 12 x 11 x 24 cm bh
CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)
II B A H A N P E N U T U P A T A P
1 SIRAP (100 lbr) pak
Sirap asbes semen m2
2 GENTENG BETON
Genteng Beton Warna standard bh
Genteng Beton Warna Special bh
Genteng Beton Warna Khusus bh
Kerpus Beton Warna Standard bh 4,900
Kerpus Beton Warna Special bh
Kerpus Beton Warna Khusus bh
Genteng beton ex. Mutiara bh
Genteng beton flat ex. Mutiara bh
Genteng press beton polos tipe nusantara 2,400
4 GENTENG KACA
Vlaam tebal 2 mm bh
Vlaam tebal 3 mm bh
Kodok tebal 2 mm bh
Kodok tebal 3 mm bh
CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)
6 ASBES PLAT
. 100cm X 100 cm X 3 mm bh 17,300
. 100cm X 100 cm X 4 mm bh
. 50 cm X 200 cm X 3 mm bh
. 40 cm X 200 cm X 3 mm bh
CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)
III B A H A N K A Y U
1 JATI Papan m3
Balok/pesagen m3
Reng m3
Balok kelas II m3 13,537,100
Balok kelas III m3 11,454,500
Papan kelas II m3 14,578,500
Papan kelas III m3 12,495,800
CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)
Besar 10 - 12 x 400 cm bt
Kayu cetakan m3
Kayu bakar m3
Bambu bt 13,200
Kayu list m'
Kayu list profil m'
Anyaman Bambu m2
Bilik Bambu m2 20,000
Reng bangkirai 2/3 m 3,300
Reng bangkirai m3 5,227,200
Reng jati 2/3 kelas III m 5,700
Reng jati kelas II m3 10,290,000
Reng jati kelas III m3 8,712,300
Kayu usuk bangkirai m3 8,500,000
Kayu usuk kruing m3 5,400,000
Reng Kamfer m3 5,800,000
4 UBIN PORSELIN
Lokal 11 X 11 putih dos
11 X 11 warna dos
Lokal 15 X 15 putih dos
15 X 15 warna dos
5 MOZAIK PORSELIN
10 X 20 cm m2
15 X 15 cm m2
20 X 20 cm m2
20 X 25 cm m2
CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)
25 x 25 cm m2
15 x 20 cm m2
Keramik anti slip 38,000
Keramik warna pola 30/30 m2 42,100
Keramik warna pola 40/40 m2 52,800
Keramik dinding 20/25 m2 44,600
Keramik dinding 20/20 m2 44,600
Keramik dinding list 5/20 bh 4,000
Keramik plin 10/20 bh 3,000
Karpet m2 110,000
7 Parquet Jati m2 160,000
Wallpaper m2 35,000
8 Batu Candi m2 99,100
Batu andesit m2 150,000
Batu andesit alur m2 170,000
9 Batu Tempel Hitam m2
10 GRANITO 40 x 40 cm m2 157,000
30 x 30 cm m2
11 Marmer m2 98,000
CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)
V.BAHAN CETAK
1 BUIS BETON Ø 10 cm - 100 cm bh
Ø 20 cm - 100 cm bh 27,250
Ø 30 cm - 100 cm bh 42,100
Ø 40 cm - 100 cm bh 52,000
Ø 50 cm - 100 cm bh 77,650
Ø 60 cm - 100 cm bh 115,700
Ø 70 cm - 100 cm bh
Ø 80 cm - 100 cm bh
Ø 100 cm - 100 cm bh 229,700
Ø 80 cm - 50 cm bh 78,500
Ø 90 cm - 50 cm bh 86,700
Ø 100 cm - 50 cm bh 114,800
U 10 cm - 100 cm bh
U 15 cm - 100 cm bh
U 20 cm - 100 cm bh 37,150
U 30 cm - 100 cm bh 47,100
U 50 cm - 100 cm bh
VI B A H A N B E S I
1 BESI BETON besi beton polos kg 10,000
besi beton prestress kg
besi beton ulir kg 10,000
CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)
7 LAIN-LAIN
Paku asbes kg 23,100
Paku sekrup asbes bh 18,100
Paku crampon bh
Dynabolt ukuran 8 mm x 65 mm bh
Baut gording kg
Hollow Galvanis 2.4. 400 bt
Hollow Galvanis 4.4. 400 bt
Baja Ringan C.75 ex. Taso bt
Skrup Fixer bh 750
Sealant bh 50,000
Venetions Blinds atau Vertical Blinds (tirai) m2 95,000
VII B A H A N P I P A
1 Pipa PVC SII SCJ , S - 12,5 (10 bar)
Pipa PVC DN 20 ( ½" ) AW JIS btg 14,800
Pipa PVC DN 25 ( ¾" ) AW JIS btg 20,600
Pipa PVC DN 32 ( 1" ) AW JIS btg 28,900
Pipa PVC DN 40 ( 1½" ) btg 24,700
Pipa PVC DN 63 ( 2" ) btg 48,700
Pipa PVC DN 90 ( 3" ) btg -
Pipa PVC DN 110 ( 4" ) btg 152,800
Pipa PVC DN 160 ( 6" ) btg -
Pipa PVC DN 200 ( 8" ) btg -
Pipa PVC DN 250 ( 10" ) btg -
Pipa PVC DN 315 ( 12" ) btg -
Pipa PVC Ø 4" (AW - SCJ) 4 m 152,800
Pipa PVC Ø 2" (AW - SCJ) 4 m 48,700
CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)
VIII B A H A N L A N G I T - L A N G I T
1 AKUSTIK-uk : 30 X 30 lbr
30 X 60 lbr
60 X 120 lbr
List Kayu Profil m' 6,600
2 SOFT BOARD-uk: 4'X 8' (1,2 x2,4 m2)
Gypsum tebal 9 mm lbr 60,000
Gypsum tebal 12 mm lbr
List Gypsum m'
Gypsum tebal 9 mm (120 x 240) lbr
lbr
lbr
lbr
lbr
Sekrup Gypsum bh
Compound zak
GRC Board lbr
Dinabolt Bh
Cotton Plaster bh
List Gypsum m'
Tepung Gypsum kg
4 PLY WOOD
CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)
Teak wood
90 X 210 X 3 mm lbr
. 120 X 240 X 3 mm lbr 80,000
. 90 X 210 X 4 mm lbr 52,800
. 90 X 210 X 9 mm lbr
. 90 X 210 X 12 mm lbr
. 90 X 210 X 15 mm lbr
. 90 X 210 X 18 mm lbr
Tripleks
. 120 X 240 X 3 mm lbr 52,800
. 120 X 240 X 4 mm lbr 62,800
. 120 X 240 X 6 mm lbr
Multipleks
. 120 X 240 X 9 mm lbr 109,000
. 120 X 240 X 12 mm lbr 138,800
. 120 X 240 X 15 mm lbr
. 120 X 240 X 18 mm lbr
Formika ukuran pintu lbr 75,000
2 TEMBOK
Kalkarium kg
Kapur sirih kg
Plamur kg 13,200
CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)
3 BESI
Menie kg 27,250
Cat mengkilat kg
Cat kg 50,000
Thinner A ltr
Minyak cat ltr 14,000
Thinner Super ltr
Residu (teer/aspal) drum 296,000
Fibre glass (tanki air)
kapasitas 550 liter. bh
kapasitas 1100 liter. bh
Lem Aica Aibon kg 15,700
X BAHAN KACA
1 POLOS 3 mm m2 57,000
5 mm m2 78,000
8 mm m2
12 mm m2
2 ES KABUR 3 mm m2
5 mm m2
3 RAY BAND 3 mm m2
5 mm m2 89,000
8 mm m2
12 mm m2
4 TEMPERED 12 mm m2
CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)
2 SKAKELAR
Out bauw . Seri bh
Engkel bh
In bauw . Seri bh
Engkel bh
4 STEKER - Biasa bh
Arde bh
T Biasa bh
T dengan Arde bh
5 FITING Flaon bh
Gantung bh
Kap bh
Kombinasi bh
CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)
2 X slag bh 131,400
Kuda : 1 X slag bh -
2 X slag bh 49,500
2 KUNCI SLOOD -
Sekelas Kuda Terbang bh 49,500
Sekelas Anchor bh 156,100
Kunci Lemari bh 5,000
2 ENGSEL DAN GERENDEL
Engsel Angin bh
Kupu-kupu biasa bh 8,200
Nylon kupu-kupu bh -
Espagnoled - dalam negeri bh -
Grendel Tanam luar negeri bh -
Grendel biasa bh 3,300
Kait Angin bh 2,400
Door Stop bh
XIIIBAHAN SANITAIR
1 KLOSET DUDUK bh 961,900
2 KLOSET JONGKOK bh 125,600
3 WASTAFEL PEDESTAL bh -
4 WASTAFEL MEJA OVAL bh -
5 WASTAFEL GANTUNG BULAT bh 261,900
6 WASTAFEL GANTUNG SUDUT bh -
7 WASTAFEL GANTUNG SUDUT KECIL bh -
8 WASTAFEL BAK CUCI bh -
9 TEMPAT SABUN GANTUNG bh -
10 TEMPAT SABUN TANAM bh -
URINOIR KERAMIK STANDART bh 1,151,200
BAK MANDI FIBRE GLASS 70.70.80 bh 261,900
11 SEPTIC TANK (ETERNIT GRESIK) -
5 Pemakai 500 liter unit -
10 Pemakai 1.000 liter unit -
12 LAIN - LAIN -
Kran Air 1/2" bh -
Kran Air 3/4" bh 19,800
Seal tape bh 3,300
Floor drain bh 3,300
Roof drain kuningan
Bak Cuci Piring bh 230,500
Water drain bh 50,000
CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)
4PAKU - beton kg
5MUR BAUT (kuda-kuda) kg
6ANGKUR BAUT bh
7LEM KAYU bh 15,700
8Tali Ijuk kg 2,000
Paku Pancing 60 x 230 kg 15,500
XV POMPA AIR
1 POMPA AIR TANGAN
Dragon buatan Indonesia bh
2 POMPA AIR LISTRIK
Sanyo 100 watt bh
Fuji 250 watt bh
Shimizu . 100 watt bh
. 90 watt bh
Dab . 125 watt bh
. 175 watt bh
CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)
CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)
Hotmix Tebal = 4 Cm m2
Hotmix Tebal = 5 Cm m2
Hotmix Tebal = 6 Cm m2
Hotmix Tebal = 7 Cm m2
Binder Course ton
Wearing Course ton
Hot Roller Sheet ton
Sand Sheet ton
Sand Sheet Emulsi ton
Cold Mix ton
Prime / Tack Coard RC liter
Prime Coat MC liter
Prime / Tack Coat Emulsi liter
10 K A C A
Cermin tebal 5 mm m2
CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)
Air m3 72,500
Koas Alang-alang ikat
Solar (Industri) ltr 6,400
Premium (Industri) ltr 6,700
Pelumas ltr 15,700
Vynil 30 x 30 cm bh
13 WATER PROOFING 5 kg
5 kg
20 Ltr
CK Boyolali
HARGA HARGA HARGA INDEX
HARGA INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp) (Rp) (Rp)
0.00
0.00 229,000.00
190,000.00 157,020.00 239,000.00 159,000
190,000.00 157,020.00 260,000.00 142,000
200,000.00 165,280.00 135,000.00
200,000.00 163,880.00 200,000.00 240,000
94,210.00 110,000.00 114,000
69,580.00 0.00 102,000
83,960.00 240,000.00 123,000
177,560.00 230,000.00 260,000
170,240.00 215,000.00 250,000
0.00 0.00
0.00 0.00
530.00 760 700
0.00 3400
0.00 3920
0.00 3700
0.00 3700
0.00
86,770.00 125000 102,000
185,000.00 152,890.00 210000 159,000
152,890.00 224000 159,000
35,120.00 72000 52,000
0.00 0
0.00 112000
163,630.00 275000 240,000
0.00 0
0.00
51,230.00 63200 62,000
51,230.00 0 62,000
0.00 0
0.00 0
0.00 0
1,100.00 1580 1,625
0.00 112000
0.00 140000
1,450.00 13500 13,500
0.00
CK Boyolali
HARGA HARGA HARGA INDEX
HARGA INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp) (Rp) (Rp)
0.00
0.00 728000
0.00 42790
0.00
0.00
0.00 0
0.00 0
0.00 0
4,040.00 0 6,000
0.00 0
0.00 0
0.00 6280
0.00 6720
1,980.00 3,000
0.00
0.00
330.00 0 400
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
1,900.00 0 3,000
4,000.00 6,000
4,700.00 7,000
4,700.00 7,000
1250
2250
3600
2580
10640
9860
4480
7280
25200
1,500.00 2,200
1,400.00 2,100
1,100.00 1,800
1,100.00 1,700
0.00
0.00
0.00 0
0.00 0
0.00 0
0.00 0
0.00
CK Boyolali
HARGA HARGA HARGA INDEX
HARGA INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp) (Rp) (Rp)
0.00
0.00 79300
0.00 0
0.00 105800
0.00 0
0.00 0
0.00 0
0.00 0
33,050.00 0
38,010.00 53800
42,970.00 0
49,580.00 72800
56,190.00 0
62,800.00 0
53,710.00
47,680.00
0.00
0.00 0
0.00 0
0.00 0
0.00
25,950.00 0 38,000
0.00 0
0.00 0
0.00
0.00
14,290.00 0 21,000 17,300
0.00 0 -
0.00 0 -
0.00 0 -
0.00 -
0.00 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 -
0.00 0 -
0.00 25200 -
0.00 35300 -
0.00 53800 -
27,270.00 0 40,000 33,000
0.00 0 -
0.00 -
CK Boyolali
HARGA HARGA HARGA INDEX
HARGA INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp) (Rp) (Rp)
0.00 -
19,750.00 29,000 23,900
28,670.00 42,000 34,700
0.00 -
0.00 0 -
39,580.00 0 58,000 47,900
49,170.00 42600 72,000 59,500
65,530.00 58300 96,000 79,300
0.00 0 -
41,650.00 -
0.00 -
0.00 50000 -
0.00 75000 -
0.00 800 -
0.00 20000 -
0.00 -
0.00 -
0.00 26280000 -
0.00 23968000 -
0.00 21400000 -
11,187,680.00 16,380,000 13,537,100
9,466,520.00 13,860,000 11,454,500
12,048,340.00 17,640,000 14,578,500
10,327,100.00 15,120,000 12,495,800
0.00 -
6,249,500.00 9800000 9,150,000 7,561,900
6,048,010.00 9072000 8,855,000 7,318,100
0.00 -
4,793,380.00 6498000 7,337,000 6,063,600
4,628,090.00 5936000 9,244,000 7,639,600
0.00 -
3,801,650.00 5600000 6,325,000 5,227,200
3,388,420.00 5152000 5,693,000 4,704,900
0.00 3304000 -
0.00 -
0.00 3696000 -
1,652,890.00 3136000 2,530,000 2,090,900
0.00 -
8,512,390.00 12880000 11,845,000 9,789,200
7,685,950.00 11760000 10,925,000 9,028,900
0.00 -
2,479,330.00 3696000 3,795,000 3,136,300
2,066,110.00 3136000 3,163,000 2,614,000
0.00 -
14,870.00 20000 20,000 18,000
0.00 16000 -
CK Boyolali
HARGA HARGA HARGA INDEX
HARGA INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp) (Rp) (Rp)
0.00 25000 -
0.00 0 -
0.00 812000 -
10,900.00 14200 16,000 13,200
0.00 33750 -
0.00 9700 -
0.00 26900 -
16,520.00 -
0.00 -
0.00 -
0.00 40320 -
0.00 31360 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 -
0.00 0 -
0.00 0 -
0.00 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 -
0.00 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 -
34,130.00 50400 50,000 41,300
34,790.00 0 51,000 42,100
0.00 0 -
CK Boyolali
HARGA HARGA HARGA INDEX
HARGA INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp) (Rp) (Rp)
0.00 0 -
0.00 0 -
31,400.00 46,000 38,000
34,790.00 51,000 42,100
43,630.00 64,000 52,800
36,850.00 54,000 44,600
36,850.00 54,000 44,600
3,300.00
2,470.00
90,900.00
132,230.00 0 -
28,920.00 -
81,900.00 0 -
123,960.00 -
0.00 0 -
0.00 -
129,750.00 0 190,000 157,000
0.00 0 -
80,990.00 107520 107,520 97,745
0.00 -
0.00 60480 -
0.00 50400 -
0.00 58240 -
0.00 68320 -
0.00 90720 -
0.00 78400 -
0.00 98560 -
0.00 49280 -
0.00 57120 -
0.00 62720 -
0.00 72800 -
0.00 107520 -
0.00 85120 -
0.00 924000 -
0.00 284480 -
0.00 470400 -
0.00 154560 -
81,900.00 143360 120,000 99,100
0.00 201600 -
0.00 61600 -
0.00 154560 -
0.00 -
0.00 175000 -
0.00 15000 -
0.00 23000 -
CK Boyolali
HARGA HARGA HARGA INDEX
HARGA INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp) (Rp) (Rp)
0.00 -
0.00 -
0.00 -
0.00 0 -
22,520.00 39200 33,000 27,200
34,790.00 56000 51,000 42,100
42,970.00 67200 63,000 52,000
64,170.00 75100 94,000 77,600
95,610.00 0 140,000 115,700
0.00 0 -
0.00 100800 -
189,830.00 134100 278,000 229,700
64,870.00 95,000 78,500
71,650.00 105,000 86,700
94,870.00 139,000 114,800
0.00 0 -
0.00 0 -
30,700.00 37000 45,000 37,100
38,920.00 42600 57,000 47,100
0.00 0 -
0.00 -
0.00 -
4,950.00 0 6,000 4,900
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 -
0.00 -
8,260.00 10650 11,000 9,000
0.00 0 -
8,260.00 10650 11,000 9,000
0.00 -
3,380.00 10650 5,000 4,100
0.00 -
9,500.00 12900 14,000 11,500
12,230.00 18,000 14,800
0.00 -
0.00 0 -
0.00 0 -
0.00 616000 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
CK Boyolali
HARGA HARGA HARGA INDEX
HARGA INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp) (Rp) (Rp)
9,540.00 13900 14,000 11,500
0.00 -
12,970.00 16800 19,000 15,700
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 17250 -
0.00 16000 -
21,480.00 32,000 26,400
0.00 -
0.00 -
19,090.00 23600 28,000 23,100
14,950.00 650 22,000 18,100
0.00 1750 -
0.00 1600 -
0.00 12600 -
0.00 21300 -
0.00 28000 -
0.00 75000 -
610.00 -
0.00 -
0.00 -
0.00 -
12,230.00 0 18,000 14,800
17,020.00 0 25,000 20,600
23,880.00 0 35,000 28,900
20,410.00 0 30,000 24,700
40,240.00 0 59,000 48,700
0.00 0 -
126,280.00 0 185,000 152,800
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
126,280.00 185,000 152,800
40,240.00 59,000 48,700
CK Boyolali
HARGA HARGA HARGA INDEX
HARGA INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp) (Rp) (Rp)
20,410.00 30,000 24,700
23,880.00 35,000 28,900
17,020.00 25,000 20,600
12,230.00 18,000 14,800
0.00 -
0.00 -
73,710.00 0 108,000 89,200
90,080.00 0 132,000 109,000
135,200.00 0 198,000 163,600
237,680.00 0 348,000 287,600
299,090.00 0 438,000 361,900
0.00 0 -
467,100.00 0 684,000 565,200
458,920.00 0 672,000 555,300
1,040,900.00 0 1,524,000 1,259,500
0.00 0 -
0.00 0 -
0.00 -
0.00 -
0.00 0 -
0.00 0 -
0.00 0 -
5,450.00 9700 8,000 6,600
0.00 -
49,580.00 67968 76,000 62,800
0.00 84096 -
0.00 9000 -
0.00 80000 -
0.00 75000 -
0.00 75000 -
0.00 65000 -
0.00 65000 -
0.00 12.57142857 -
0.00 75000 -
0.00 68000 -
0.00 7200 -
0.00 15000 -
0.00 8500 -
0.00 12500 -
0.00 -
13,420.00 -
18,590.00
0.00 -
0.00 0 -
0.00 -
0.00 -
CK Boyolali
HARGA HARGA HARGA INDEX
HARGA INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp) (Rp) (Rp)
0.00 -
0.00 0 -
66,110.00 0 -
43,630.00 0 64,000 52,800
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 -
43,630.00 50400 64,000 52,800
51,900.00 67200 76,000 62,800
0.00 84000 -
0.00 -
90,080.00 128800 132,000 109,000
114,710.00 168000 168,000 138,800
0.00 0 -
0.00 0 -
61,980.00 0 -
0.00 -
0.00 85200 -
0.00 34800 -
0.00 46000 -
14,290.00 15700 21,000 17,300
0.00 66100 -
43,630.00 -
0.00 -
0.00 -
1.98 23,880.00 33600 35,000 28,900
2.88 10,900.00 23600 16,000 13,200
0.6875 4,710.00 9600 7,000 5,700
36,300 0.00 22400 -
51,900.00 0 76,000 62,800
0.00 0 -
0.00 0 -
6,110.00 0 9,000 7,400
0.00 58300 -
0.00 39200 -
0.00 18000 -
34,790.00 0 51,000 42,100
34,790.00 0 51,000 42,100
0.00 -
0.00 -
0.00 0 -
0.00 0 -
10,900.00 23600 16,000 13,200
CK Boyolali
HARGA HARGA HARGA INDEX
HARGA INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp) (Rp) (Rp)
0.00 80640 -
0.00 0 -
0.00 0 -
0.00 112500 -
0.00 0 -
0.00 67200 -
0.00 67200 -
0.00 64960 -
13,220.00 21,000 17,300
0.00 -
0.00 -
22,520.00 33600 35,000 28,900
0.00 58300 -
41,320.00 0 76,000 62,800
0.00 23600 -
11,570.00 25200 17,000 14,000
0.00 0 -
244,620.00 0 360,000 297,500
0.00 -
0.00 0 -
0.00 0 -
12,970.00 0 19,000 15,700
0.00 -
0.00 -
47,100.00 0 70,000 57,800
64,460.00 60500 95,000 78,500
0.00 69500 -
0.00 106400 -
0.00 -
0.00 0 -
0.00 79600 -
0.00 -
0.00 0 -
73,550.00 68900 82,000 67,700
0.00 74500 -
0.00 117600 -
0.00 -
0.00 1200000 -
0.00 -
0.00 -
0.00 -
0.00 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
CK Boyolali
HARGA HARGA HARGA INDEX
HARGA INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp) (Rp) (Rp)
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 -
0.00 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 -
0.00 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 -
0.00 -
0.00 0 -
0.00 0 -
40,900.00 0 60,000 49,500
CK Boyolali
HARGA HARGA HARGA INDEX
HARGA INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp) (Rp) (Rp)
108,590.00 0 159,000 131,400
0.00 0 -
40,900.00 67200 60,000 49,500
0.00 -
40,900.00 60,000 49,500
129,000.00 189,000 156,100
4,130.00 -
0.00 -
0.00 0 -
6,770.00 0 10,000 8,200
0.00 0 -
0.00 0 -
0.00 0 -
2,720.00 0 4,000 3,300
1,980.00 0 3,000 2,400
0.00 0 -
0.00 -
0.00 -
794,950.00 2184000 1,164,000 961,900
103,800.00 129000 152,000 125,600
0.00 0 -
0.00 0 -
216,440.00 0 317,000 261,900
0.00 278000 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
951,400.00 1,393,000 1,151,200
216,440.00 317,000 261,900
0.00 -
0.00 0 -
0.00 0 -
0.00 -
0.00 17000 -
16,360.00 29500 24,000 19,800
2,720.00 3400 4,000 3,300
2,720.00 56000 4,000 3,300
0.00 79000 -
190,490.00
0.00 -
0.00 -
11,570.00 14600 17,000 14,000
0.00 0 -
14,950.00 0 22,000 18,100
CK Boyolali
HARGA HARGA HARGA INDEX
HARGA INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp) (Rp) (Rp)
0.00 0 -
0.00 0 -
0.00 0 -
12,970.00 0 19,000 15,700
1,650.00 2500 2,500 2,000
12,800.00 -
0.00 -
0.00 -
0.00 0 -
0.00 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 -
0.00 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 -
0.00 0 -
0.00 0 -
1,980.00 0 3,000 2,400
0.00 0 -
30,660.00 58240 45,000 37,100
40,900.00 91840 60,000 49,500
0.00 69440 -
0.00 103040 -
30,660.00 45,000 37,100
40,900.00 60,000 49,500
49,580.00 68,000 56,100
66,110.00 80,000 66,100
CK Boyolali
HARGA HARGA HARGA INDEX
HARGA INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp) (Rp) (Rp)
53,710.00 77,000 63,600
71,070.00 90,000 74,300
0.00 -
0.00 -
0.00 1270 -
0.00 1460 -
0.00 1580 -
0.00 2180 -
0.00 2450 -
0.00 3320 -
0.00 2810 -
0.00 3840 -
0.00 4310 -
0.00 2170 -
0.00 2510 -
0.00 2720 -
0.00 3280 -
0.00 7310 -
0.00 1510 -
0.00 1730 -
0.00 1880 -
0.00 2450 -
0.00 2710 -
0.00 3640 -
0.00 3320 -
0.00 4310 -
0.00 4770 -
0.00 2590 -
0.00 2970 -
0.00 3220 -
0.00 4330 -
0.00 8340 -
0.00 26910 -
0.00 -
0.00 -
0.00 1860 -
0.00 2570 -
0.00 1690 -
0.00 2890 -
0.00 1250 -
0.00 2460 -
0.00 30360 -
0.00 36960 -
0.00 47520 -
0.00 52800 -
0.00 58080 -
CK Boyolali
HARGA HARGA HARGA INDEX
HARGA INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp) (Rp) (Rp)
0.00 55440 -
0.00 16050 -
0.00 23120 -
0.00 -
0.00 -
0.00 -
0.00 0 -
0.00 0 -
67,760.00 0 82,000 67,700
75,200.00 0 91,000 75,200
235,530.00 0 285,000 235,500
366,110.00 0 443,000 366,100
0.00 0 -
60,740.00 0 72,000 59,500
64,870.00 0 78,000 64,400
0.00 -
0.00 0 -
5,160.00 -
0.00 -
0.00 0 -
0.00 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 -
0.00 0 -
0.00 -
0.00 0 -
0.00 0 -
0.00 -
11,570.00 6000 17,000 14,000
450,740.00 0 660,000 545,400
0.00 0 -
0.00 8580 -
22,470.00 0 33,000 27,200
0.00 0 -
CK Boyolali
HARGA HARGA HARGA INDEX
HARGA INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp) (Rp) (Rp)
59,910.00 80000 80,000 66,100
0.00 0 -
5,280.00 0 6,400 5,200
5,530.00 0 6,700 5,500
12,970.00 0 19,000 15,700
0.00 0 -
0.00 -
0.00 78500 -
0.00 71000 -
0.00 525000 -
0.00 -
0.00 -
60,740.00 85000 72,000 59,500
64,870.00 108000 78,000 64,400
0.00 102000 -
0.00 -
0.00 28000 -
0.00 25500 -
0.00 75000 -
0.00 30000 -
0.00 35000 -
0.00 35000 -
0.00 600 -
0.00 6000 -
0.00 250000 -
0.00 25000 -
0.00 455000 -
0.00 55000 -
0.00 15000 -
0.00 1490000 -
0.00 637000 -
0.00 260000 -
0.00 -
-
CK Boyolali
HARGA SURVEI I HARGA SURVEI II INTERNET (Rp)
(Rp) (Rp)
530.00
CK Boyolali
HARGA SURVEI I HARGA SURVEI II INTERNET (Rp)
(Rp) (Rp)
40000 44000
46000 50600
52000 57200
60000 66000
68000 74800
132000 110000 76000 83600
CK Boyolali
HARGA SURVEI I HARGA SURVEI II INTERNET (Rp)
(Rp) (Rp)
6,000,000.00
6,000,000.00
9,500,000.00
9,500,000.00
CK Boyolali
HARGA SURVEI I HARGA SURVEI II INTERNET (Rp)
(Rp) (Rp)
42,000.00 40,000.00
49,000.00 48,000.00
CK Boyolali
HARGA SURVEI I HARGA SURVEI II INTERNET (Rp)
(Rp) (Rp)
55000
45,000.00 43000
47,000.00 45000
49,000.00 48000
49,000.00 49000
CK Boyolali
HARGA SURVEI I HARGA SURVEI II INTERNET (Rp)
(Rp) (Rp)
50,000.00
60,000.00
65,000.00
75,000.00
85,000.00
90,000.00
100,000.00
27,500.00
35,000.00
9,500.00
9,500.00
CK Boyolali
HARGA SURVEI I HARGA SURVEI II INTERNET (Rp)
(Rp) (Rp)
14,000.00
20,000.00 15,000.00
35000
160000
CK Boyolali
HARGA SURVEI I HARGA SURVEI II INTERNET (Rp)
(Rp) (Rp)
29000
22000
20000
18000
59,000.00
CK Boyolali
HARGA SURVEI I HARGA SURVEI II INTERNET (Rp)
(Rp) (Rp)
50,000.00
60,000.00
100,000.00
140,000.00
15,000.00
26,000.00
29,000.00 28,000.00
45,000.00 50,000.00
CK Boyolali
HARGA SURVEI I HARGA SURVEI II INTERNET (Rp)
(Rp) (Rp)
19,000.00 18,000.00
29,000.00
10000 20000
55,000.00
65,000.00
75,000.00
CK Boyolali
HARGA SURVEI I HARGA SURVEI II INTERNET (Rp)
(Rp) (Rp)
65,000.00
10,000.00 10,000.00
5000
5,000.00
600,000.00 650,000.00
145,000.00 140,000.00
350,000.00
15,000.00 15,000.00
12,000.00
CK Boyolali
HARGA SURVEI I HARGA SURVEI II INTERNET (Rp)
(Rp) (Rp)
13000 13000
24
CK Boyolali
DAFTAR HARGA SATUAN BAHAN BANGUNAN
PEKERJAAN : -
LOKASI : -
TAHUN ANGGARAN : -
HARGA
NO. J E N I S B A H A N SATUAN (Rp)
I BAHAN DASAR
1 BATU KALI Bulat Utuh m3
Bulat Belah m3 230,000
Pecah 10/15 m3 230,000
Pecah 5/7 m3 242,000
Pecah 3/5 m3 242,000
2 KERIKIL Timbunan Pilihan m3 114,000
Sawur / Koral m3 102,000
Beton 0,5/1 m3 123,000
Beton 1/2 m3 260,000
Beton 2/3 m3 250,000
Biasa m3
Tras Giling m3
3 BATU BATA ex lokal bh 700
Concrete Blok (CB 15) / Batako (Lubang2) bh
Batako Padat bh
Rosteer beton cetak 12 x 11 x 24 cm bh
Rosteer tanah liat bakar 12 x 11 x 24 cm bh
CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)
II B A H A N P E N U T U P A T A P
1 SIRAP (100 lbr) pak
Sirap asbes semen m2
2 GENTENG BETON
Genteng Beton Warna standard bh
Genteng Beton Warna Special bh
Genteng Beton Warna Khusus bh
Kerpus Beton Warna Standard bh 6,000
Kerpus Beton Warna Special bh
Kerpus Beton Warna Khusus bh
Genteng beton ex. Mutiara bh
Genteng beton flat ex. Mutiara bh
Genteng press beton polos tipe nusantara 3,000
4 GENTENG KACA
Vlaam tebal 2 mm bh
Vlaam tebal 3 mm bh
Kodok tebal 2 mm bh
Kodok tebal 3 mm bh
CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)
6 ASBES PLAT
. 100cm X 100 cm X 3 mm bh 21,000
. 100cm X 100 cm X 4 mm bh
. 50 cm X 200 cm X 3 mm bh
. 40 cm X 200 cm X 3 mm bh
CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)
10 ASPAL BITUMEN
Atap Onduvila lbr
Nok Onduvila lbr
Skrup pcs
Lisplank GRC 2/20 m'
III B A H A N K A Y U
1 JATI Papan m3
Balok/pesagen m3
Reng m3
Balok kelas II m3 16,380,000
Balok kelas III m3 13,860,000
Papan kelas II m3 17,640,000
Papan kelas III m3 15,120,000
CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)
Kayu cetakan m3
Kayu bakar m3
Bambu bt 16,000
Kayu list m'
Kayu list profil m'
Anyaman Bambu m2
4 UBIN PORSELIN
Lokal 11 X 11 putih dos
11 X 11 warna dos
Lokal 15 X 15 putih dos
15 X 15 warna dos
5 MOZAIK PORSELIN
10 X 20 cm m2
15 X 15 cm m2
20 X 20 cm m2
20 X 25 cm m2
8 Batu Paras m2
CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)
10 GRANITO 40 x 40 cm m2 190,000
30 x 30 cm m2
11 Marmer m2 107,520
V.BAHAN CETAK
1 BUIS BETON Ø 10 cm - 100 cm bh
Ø 20 cm - 100 cm bh 33,000
Ø 30 cm - 100 cm bh 51,000
Ø 40 cm - 100 cm bh 63,000
Ø 50 cm - 100 cm bh 94,000
Ø 60 cm - 100 cm bh 140,000
Ø 70 cm - 100 cm bh
Ø 80 cm - 100 cm bh
Ø 100 cm - 100 cm bh 278,000
Ø 80 cm - 50 cm bh 95,000
Ø 90 cm - 50 cm bh 105,000
CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)
Ø 100 cm - 50 cm bh 139,000
U 10 cm - 100 cm bh
U 15 cm - 100 cm bh
U 20 cm - 100 cm bh 45,000
U 30 cm - 100 cm bh 57,000
U 50 cm - 100 cm bh
VI B A H A N B E S I
1 BESI BETON besi beton polos kg 11,000
besi beton prestress kg
besi beton ulir kg 11,000
CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)
7 LAIN-LAIN
Paku asbes kg 28,000
Paku sekrup asbes bh 22,000
Paku crampon bh
Dynabolt ukuran 8 mm x 65 mm bh
Baut gording kg
Hollow Galvanis 2.4. 400 bt
Hollow Galvanis 4.4. 400 bt
Baja Ringan C.75 ex. Taso bt
VII B A H A N P I P A
1 Pipa PVC SII SCJ , S - 12,5 (10 bar)
Pipa PVC DN 20 ( ½" ) AW JIS btg 18,000
Pipa PVC DN 25 ( ¾" ) AW JIS btg 25,000
Pipa PVC DN 32 ( 1" ) AW JIS btg 35,000
Pipa PVC DN 40 ( 1½" ) btg 30,000
Pipa PVC DN 63 ( 2" ) btg 59,000
Pipa PVC DN 90 ( 3" ) btg
Pipa PVC DN 110 ( 4" ) btg 185,000
Pipa PVC DN 160 ( 6" ) btg
Pipa PVC DN 200 ( 8" ) btg
Pipa PVC DN 250 ( 10" ) btg
Pipa PVC DN 315 ( 12" ) btg
Pipa PVC Ø 4" (AW - SCJ) 4 m 185,000
Pipa PVC Ø 2" (AW - SCJ) 4 m 59,000
Pipa PVC Ø 1 1/2" (AW - SCJ) 4 m 30,000
Pipa PVC Ø 1" (AW - SCJ) 4 m 35,000
Pipa PVC Ø 3/4" (AW - SCJ) 4 m 25,000
Pipa PVC Ø 1/2" (AW - SCJ) 4 m 18,000
CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)
VIII B A H A N L A N G I T - L A N G I T
1 AKUSTIK-uk : 30 X 30 lbr
30 X 60 lbr
60 X 120 lbr
List Kayu Profil m' 8,000
2 SOFT BOARD-uk: 4'X 8' (1,2 x2,4 m2)
Gypsum tebal 9 mm lbr 76,000
Gypsum tebal 12 mm lbr
List Gypsum m'
Gypsum tebal 9 mm (120 x 240) lbr
lbr
lbr
lbr
lbr
Sekrup Gypsum bh
Compound zak
GRC Board lbr
Dinabolt Bh
Cotton Plaster bh
List Gypsum m'
Tepung Gypsum kg
4 PLY WOOD
Teak wood
90 X 210 X 3 mm lbr
. 120 X 240 X 3 mm lbr
. 90 X 210 X 4 mm lbr 64,000
. 90 X 210 X 9 mm lbr
. 90 X 210 X 12 mm lbr
. 90 X 210 X 15 mm lbr
. 90 X 210 X 18 mm lbr
Tripleks
. 120 X 240 X 3 mm lbr 64,000
. 120 X 240 X 4 mm lbr 76,000
. 120 X 240 X 6 mm lbr
Multipleks
. 120 X 240 X 9 mm lbr 132,000
. 120 X 240 X 12 mm lbr 168,000
. 120 X 240 X 15 mm lbr
. 120 X 240 X 18 mm lbr
Formika ukuran pintu lbr
CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)
IX B A H A N F I N I S H I N G
1 KAYU
Menie kg 35,000
Dempul plamur kg 16,000
Ambril/amplas lbr 7,000
Batu Apung kg
Cat dasar kg 76,000
. Emco kg
. Yunior 66 (nippon paint) kg
- Koas bh 9,000
. Deculux kg
. Siralax ons
. Spiritus ltr
. Plitur jadi ltr 51,000
. Vernis ltr 51,000
2 TEMBOK
Kalkarium kg
Kapur sirih kg
Plamur kg 16,000
Cat Tembok ex. Nippon Weatherbond kg
Sintex 5 kg
Danabride 5 kg
Catylac 5 kg
Mowilex 5 kg
Alkali Tembok ex. Nippon 3-in 1 Anti-Alkali Primer Sealer kg
MOWILEX PRECOAT VARNISH BATU ALAM lt
Mowilex Clear Coating lt
Cat tembok kg 21,000
3 BESI
Menie kg 35,000
Cat mengkilat kg
Cat kg 76,000
Thinner A ltr
Minyak cat ltr 17,000
Thinner Super ltr
Residu (teer/aspal) drum 360,000
Fibre glass (tanki air)
kapasitas 550 liter. bh
CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)
X BAHAN KACA
1 POLOS 3 mm m2 70,000
5 mm m2 95,000
8 mm m2
12 mm m2
2 ES KABUR 3 mm m2
5 mm m2
3 RAY BAND 3 mm m2
5 mm m2 82,000
8 mm m2
12 mm m2
4 TEMPERED 12 mm m2
2 SKAKELAR
Out bauw . Seri bh
Engkel bh
In bauw . Seri bh
CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)
Engkel bh
4 STEKER - Biasa bh
Arde bh
T Biasa bh
T dengan Arde bh
5 FITING Flaon bh
Gantung bh
Kap bh
Kombinasi bh
CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)
3 WASTAFEL PEDESTAL bh
4 WASTAFEL MEJA OVAL bh
5 WASTAFEL GANTUNG BULAT bh 317,000
6 WASTAFEL GANTUNG SUDUT bh
7 WASTAFEL GANTUNG SUDUT KECIL bh
8 WASTAFEL BAK CUCI bh
9 TEMPAT SABUN GANTUNG bh
10 TEMPAT SABUN TANAM bh
URINOIR KERAMIK STANDART bh 1,393,000
BAK MANDI FIBRE GLASS 70.70.80 bh 317,000
11 SEPTIC TANK (ETERNIT GRESIK)
5 Pemakai 500 liter unit
10 Pemakai 1.000 liter unit
12 LAIN - LAIN
Kran Air 1/2" bh
Kran Air 3/4" bh 24,000
Seal tape bh 4,000
Floor drain bh 4,000
Roof drain kuningan bh
XV POMPA AIR
1 POMPA AIR TANGAN
Dragon buatan Indonesia bh
2 POMPA AIR LISTRIK
Sanyo 100 watt bh
Fuji 250 watt bh
Shimizu . 100 watt bh
. 90 watt bh
Dab . 125 watt bh
. 175 watt bh
CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)
3 UNIDECOR Abu-abu m2
Merah/hitam m2
4 UNI Abu-abu m2
Merah/hitam m2
5 TRIHEX Abu-abu m2
Merah/hitam m2
6 OLYMPIA HEXA Abu-abu m2
7 HEXAGONAL Abu-abu m2
Merah/hitam m2
8 CASTLE Abu-abu m2
9 TRAPEZ Abu-abu m2
10 TRAPEZ GRASS BLOCK
Abu-abu m2
11 STANDARD GRASS BLOCK ABU-ABU BH
12 BATACO BH 3,000
13 KANSTEEN m'
14 Paving block natural 6 cm ( K- 175 ) m2 45,000
15 Paving block natural 8 cm ( K-175 ) m2 60,000
16 Paving block warna 6 cm ( K- 175 ) m2
17 Paving block warna 8 cm ( K-175 ) m2
Paving abu-abu tebal 6 cm m2 45,000
Paving abu-abu tebal 8 cm m2 60,000
Paving abu-abu K.225 tebal 6 cm m2 68,000
Paving abu-abu K.225 tebal 8 cm m2 80,000
Paving abu-abu K.275 tebal 6 cm m2 77,000
Paving abu-abu K.275 tebal 8 cm m2 90,000
CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)
8 ASPAL.
Aspal Ex Pertamina isi Net 160 kg drum
Hotmix Tebal = 4 Cm m2
CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)
Hotmix Tebal = 5 Cm m2
Hotmix Tebal = 6 Cm m2
Hotmix Tebal = 7 Cm m2
Binder Course ton
Wearing Course ton
Hot Roller Sheet ton
Sand Sheet ton
Sand Sheet Emulsi ton
Cold Mix ton
Prime / Tack Coard RC liter
Prime Coat MC liter
Prime / Tack Coat Emulsi liter
10 K A C A
Cermin tebal 5 mm m2
13 WATER PROOFING 5 kg
5 kg
20 Ltr
CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)
Skrup Fixer bh
Profil Kaca m'
Handle Pintu + Kunci set
Spagnolet Tanam bh
Door Closer set
Spandek PVC m2
Sindik Pintu bh
Floor Hinge Ex. Dekson set
Patch Fitting bh
Pull Handle set
CK Boyolali
HARGA HARGA HARGA INDEX
HARGA HARGA SURVEI I
INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp)
(Rp) (Rp) (Rp)
0.00
0.00 229,000.00
190,000.00 190,080.00 239,000.00 159,000
190,000.00 190,080.00 260,000.00 142,000
200,000.00 200,000.00 135,000.00
200,000.00 200,000.00 200,000.00 240,000
94,210.00 110,000.00 114,000
84,290.00 0.00 102,000
101,650.00 240,000.00 123,000
214,870.00 230,000.00 260,000
206,610.00 215,000.00 250,000
0.00 0.00
0.00 0.00
570.00 760 700
0.00 3400
0.00 3920
0.00 3700
0.00 3700
0.00
84,290.00 125000 102,000
185,000.00 131,400.00 210000 159,000
131,400.00 224000 159,000
42,970.00 72000 52,000
0.00 0
0.00 112000
198,340.00 275000 240,000
0.00 0
0.00
51,230.00 63200 62,000
51,230.00 0 62,000
0.00 0
0.00 0
0.00 0
1,340.00 1580 1,625
0.00 112000
0.00 140000
11,150.00 13500 13,500
0.00
CK Boyolali
HARGA HARGA HARGA INDEX
HARGA HARGA SURVEI I
INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp)
(Rp) (Rp) (Rp)
0.00
0.00 728000
0.00 42790
0.00
0.00
0.00 0
0.00 0
0.00 0
4,950.00 0 6,000
0.00 0
0.00 0
0.00 6280
0.00 6720
2,470.00 3,000
0.00
0.00
330.00 0 400
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
2,470.00 0 3,000
4,950.00 6,000
5,780.00 7,000
5,780.00 7,000
0.00 1250
0.00 2250
0.00 3600
0.00 2580
0.00 10640
0.00 9860
0.00 4480
0.00 7280
0.00 25200
1,810.00 2,200
1,730.00 2,100
1,480.00 1,800
1,400.00 1,700
0.00
0.00
0.00 0
0.00 0
0.00 0
0.00 0
0.00
CK Boyolali
HARGA HARGA HARGA INDEX
HARGA HARGA SURVEI I
INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp)
(Rp) (Rp) (Rp)
0.00
0.00 79300
0.00 0
0.00 105800
0.00 0
0.00 0
0.00 0
0.00 0
36,360.00 0 44,000
41,810.00 53800 50,600
47,270.00 0 57,200
54,540.00 72800 66,000
61,810.00 0 74,800
85,120.00 0 103,000 132000
0.00
0.00
0.00 0
0.00 0
0.00 0
0.00
31,400.00 0 38,000
0.00 0
0.00 0
0.00
0.00
17,350.00 0 21,000
0.00 0
0.00 0
0.00 0
0.00
0.00
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00
0.00 0
0.00 25200
0.00 35300
0.00 53800
33,050.00 0 40,000
0.00 0
0.00
0.00
CK Boyolali
HARGA HARGA HARGA INDEX
HARGA HARGA SURVEI I
INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp)
(Rp) (Rp) (Rp)
23,960.00 29,000
34,710.00 42,000
0.00
0.00 0
47,930.00 0 58,000
59,500.00 42600 72,000
79,330.00 58300 96,000
0.00 0
0.00
0.00
0.00 50000
0.00 75000
0.00 800
0.00 20000
0.00
0.00
0.00 26280000
0.00 23968000
0.00 21400000
13,537,190.00 16,380,000
11,454,540.00 13,860,000
14,578,510.00 17,640,000
12,495,860.00 15,120,000
0.00
7,561,980.00 9800000 9,150,000
7,318,180.00 9072000 8,855,000
0.00
6,063,630.00 6498000 7,337,000 6,000,000.00
7,639,660.00 5936000 9,244,000 6,000,000.00
0.00
5,227,270.00 5600000 6,325,000
4,704,950.00 5152000 5,693,000
0.00 3304000
0.00
0.00 3696000
2,090,900.00 3136000 2,530,000
0.00
9,789,250.00 12880000 11,845,000 9,500,000.00
9,028,920.00 11760000 10,925,000 9,500,000.00
0.00
3,136,360.00 3696000 3,795,000
2,614,040.00 3136000 3,163,000
0.00
16,520.00 20000 20,000
0.00 16000
0.00 25000
CK Boyolali
HARGA HARGA HARGA INDEX
HARGA HARGA SURVEI I
INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp)
(Rp) (Rp) (Rp)
0.00 0
0.00 812000
13,220.00 14200 16,000
0.00 33750
0.00 9700
0.00 26900
0.00
0.00
0.00
0.00 40320
0.00 31360
0.00 0
0.00 0
0.00 0
0.00
0.00 0
0.00 0
0.00
0.00 0
0.00 0
0.00 0
0.00
0.00
0.00 0
0.00 0
0.00 0
0.00 0
0.00
0.00 0
0.00 0
0.00 0
0.00 0
0.00
41,320.00 50400 50,000 42,000.00
42,140.00 0 51,000 49,000.00
0.00 0
0.00 0
0.00 0
38,010.00 46,000
42,140.00 51,000 45,000.00
52,890.00 64,000 47,000.00
44,620.00 54,000 49,000.00
44,620.00 54,000 49,000.00
0.00 0
0.00
0.00 0
CK Boyolali
HARGA HARGA HARGA INDEX
HARGA HARGA SURVEI I
INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp)
(Rp) (Rp) (Rp)
0.00
0.00 0
0.00
157,020.00 0 190,000
0.00 0
88,850.00 107520 107,520
0.00
0.00 60480
0.00 50400
0.00 58240
0.00 68320
0.00 90720
0.00 78400
0.00 98560
0.00 49280
0.00 57120
0.00 62720
0.00 72800
0.00 107520
0.00 85120
0.00 924000
0.00 284480
0.00 470400
0.00 154560
99,170.00 143360 120,000
0.00 201600
0.00 61600
0.00 154560
0.00
0.00 175000
0.00 15000
0.00 23000
0.00
0.00
0.00
0.00 0
27,270.00 39200 33,000
42,140.00 56000 51,000
52,060.00 67200 63,000
77,680.00 75100 94,000
115,700.00 0 140,000
0.00 0
0.00 100800
229,750.00 134100 278,000
78,510.00 95,000
86,770.00 105,000
CK Boyolali
HARGA HARGA HARGA INDEX
HARGA HARGA SURVEI I
INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp)
(Rp) (Rp) (Rp)
114,870.00 139,000
0.00 0
0.00 0
37,190.00 37000 45,000
47,100.00 42600 57,000
0.00 0
0.00
0.00
4,950.00 0 6,000
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00
0.00
9,090.00 10650 11,000
0.00 0
9,090.00 10650 11,000
0.00
4,130.00 10650 5,000
0.00
11,570.00 12900 14,000
14,870.00 18,000
0.00
0.00 0
0.00 0
0.00 616000
0.00 0
0.00 0
0.00 0
0.00 0
11,570.00 13900 14,000
0.00
15,700.00 16800 19,000
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 17250
0.00 16000
CK Boyolali
HARGA HARGA HARGA INDEX
HARGA HARGA SURVEI I
INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp)
(Rp) (Rp) (Rp)
26,440.00 32,000
0.00
0.00
23,140.00 23600 28,000 20,000.00
18,180.00 650 22,000
0.00 1750
0.00 1600
0.00 12600
0.00 21300
0.00 28000
0.00 75000
0.00
0.00
0.00
0.00
14,870.00 0 18,000
20,660.00 0 25,000
28,920.00 0 35,000
24,790.00 0 30,000
48,760.00 0 59,000
0.00 0
152,890.00 0 185,000
0.00 0
0.00 0
0.00 0
0.00 0
152,890.00 185,000 160000
48,760.00 59,000
24,790.00 30,000 29000
28,920.00 35,000 22000
20,660.00 25,000 20000
14,870.00 18,000 18000
0.00
0.00
89,250.00 0 108,000
109,090.00 0 132,000
163,630.00 0 198,000
287,600.00 0 348,000
361,980.00 0 438,000
0.00 0
565,280.00 0 684,000
555,370.00 0 672,000
1,259,500.00 0 1,524,000
0.00 0
0.00 0
0.00
CK Boyolali
HARGA HARGA HARGA INDEX
HARGA HARGA SURVEI I
INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp)
(Rp) (Rp) (Rp)
0.00
0.00 0
0.00 0
0.00 0
6,610.00 9700 8,000
0.00
62,800.00 67968 76,000
0.00 84096
0.00 9000
0.00 80000
0.00 75000
0.00 75000
0.00 65000
0.00 65000
0.00 12.57142857
0.00 75000
0.00 68000
0.00 7200
0.00 15000
0.00 8500
0.00 12500
0.00
0.00
0.00
0.00 0
0.00
0.00
0.00
0.00 0
0.00 0
52,890.00 0 64,000
0.00 0
0.00 0
0.00 0
0.00 0
0.00
52,890.00 50400 64,000 50,000.00
62,800.00 67200 76,000 60,000.00
0.00 84000
0.00
109,090.00 128800 132,000
138,840.00 168000 168,000
0.00 0
0.00 0
0.00 0
0.00
CK Boyolali
HARGA HARGA HARGA INDEX
HARGA HARGA SURVEI I
INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp)
(Rp) (Rp) (Rp)
0.00 85200
0.00 34800
0.00 46000
17,350.00 15700 21,000 15,000.00
0.00 66100
0.00
0.00
0.00
28,920.00 33600 35,000
13,220.00 23600 16,000 29,000.00
5,780.00 9600 7,000
0.00 22400
62,800.00 0 76,000 45,000.00
0.00 0
0.00 0
7,430.00 0 9,000
0.00 58300
0.00 39200
0.00 18000
42,140.00 0 51,000
42,140.00 0 51,000
0.00
0.00
0.00 0
0.00 0
13,220.00 23600 16,000
0.00 80640
0.00 0
0.00 0
0.00 112500
0.00 0
0.00 67200
0.00 67200
0.00 64960
17,350.00 21,000 19,000.00
0.00
0.00
28,920.00 33600 35,000 29,000.00
0.00 58300
62,800.00 0 76,000
0.00 23600
14,040.00 25200 17,000 10000
0.00 0
297,520.00 0 360,000
0.00
0.00 0
CK Boyolali
HARGA HARGA HARGA INDEX
HARGA HARGA SURVEI I
INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp)
(Rp) (Rp) (Rp)
0.00 0
15,700.00 0 19,000
0.00
0.00
57,850.00 0 70,000 55,000.00
78,510.00 60500 95,000 65,000.00
0.00 69500
0.00 106400
0.00
0.00 0
0.00 79600
0.00
0.00 0
67,760.00 68900 82,000 75,000.00
0.00 74500
0.00 117600
0.00
0.00 1200000
0.00
0.00
0.00
0.00
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00
0.00
0.00 0
0.00 0
0.00 0
CK Boyolali
HARGA HARGA HARGA INDEX
HARGA HARGA SURVEI I
INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp)
(Rp) (Rp) (Rp)
0.00 0
0.00
0.00
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00
0.00 0
0.00 0
0.00 0
0.00 0
0.00
0.00 0
0.00 0
0.00 0
0.00 0
0.00
0.00
0.00 0
0.00 0
49,580.00 0 60,000
131,400.00 0 159,000
0.00 0
49,580.00 67200 60,000
0.00
49,580.00 60,000
156,190.00 189,000
0.00
0.00
0.00 0
8,260.00 0 10,000 10,000.00
0.00 0
0.00 0
0.00 0
3,300.00 0 4,000
2,470.00 0 3,000
0.00 0
0.00
0.00
961,980.00 2184000 1,164,000 600,000.00
125,610.00 129000 152,000 145,000.00
CK Boyolali
HARGA HARGA HARGA INDEX
HARGA HARGA SURVEI I
INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp)
(Rp) (Rp) (Rp)
0.00 0
0.00 0
261,980.00 0 317,000 350,000.00
0.00 278000
0.00 0
0.00 0
0.00 0
0.00 0
1,151,230.00 1,393,000
261,980.00 317,000
0.00
0.00 0
0.00 0
0.00
0.00 17000
19,830.00 29500 24,000 15,000.00
3,300.00 3400 4,000
3,300.00 56000 4,000
0.00 79000
0.00
0.00
14,040.00 14600 17,000 12,000.00
0.00 0
18,180.00 0 22,000
0.00 0
0.00 0
0.00 0
15,700.00 0 19,000 13000
2,060.00 2500 2,500
0.00
0.00 24
0.00
0.00 0
0.00
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00
0.00
0.00 0
0.00 0
0.00 0
0.00 0
CK Boyolali
HARGA HARGA HARGA INDEX
HARGA HARGA SURVEI I
INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp)
(Rp) (Rp) (Rp)
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00
0.00 0
0.00 0
2,470.00 0 3,000
0.00 0
37,190.00 58240 45,000
49,580.00 91840 60,000
0.00 69440
0.00 103040
37,190.00 45,000
49,580.00 60,000
56,190.00 68,000
66,110.00 80,000
63,630.00 77,000
74,380.00 90,000
0.00
0.00
0.00 1270
0.00 1460
0.00 1580
0.00 2180
0.00 2450
0.00 3320
0.00 2810
0.00 3840
0.00 4310
0.00 2170
0.00 2510
0.00 2720
0.00 3280
0.00 7310
0.00 1510
0.00 1730
0.00 1880
0.00 2450
CK Boyolali
HARGA HARGA HARGA INDEX
HARGA HARGA SURVEI I
INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp)
(Rp) (Rp) (Rp)
0.00 2710
0.00 3640
0.00 3320
0.00 4310
0.00 4770
0.00 2590
0.00 2970
0.00 3220
0.00 4330
0.00 8340
0.00 26910
0.00
0.00
0.00 1860
0.00 2570
0.00 1690
0.00 2890
0.00 1250
0.00 2460
0.00 30360
0.00 36960
0.00 47520
0.00 52800
0.00 58080
0.00 55440
0.00 16050
0.00 23120
0.00
0.00
0.00
0.00 0
0.00 0
67,760.00 0 82,000
75,200.00 0 91,000
235,530.00 0 285,000
366,110.00 0 443,000
0.00 0
59,500.00 0 72,000
64,460.00 0 78,000
0.00
0.00 0
0.00
0.00
0.00 0
0.00
0.00 0
CK Boyolali
HARGA HARGA HARGA INDEX
HARGA HARGA SURVEI I
INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp)
(Rp) (Rp) (Rp)
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00
0.00 0
0.00
0.00 0
0.00 0
0.00
14,040.00 6000 17,000
545,450.00 0 660,000
0.00 0
0.00 8580
27,270.00 0 33,000
0.00 0
66,110.00 80000 80,000
0.00 0
5,280.00 0 6,400
5,530.00 0 6,700
15,700.00 0 19,000
0.00 0
0.00
0.00 78500
0.00 71000
0.00 525000
0.00
0.00
59,500.00 85000 72,000
64,460.00 108000 78,000
0.00 102000
0.00
0.00 28000
0.00 25500
0.00 75000
0.00 30000
0.00 35000
0.00 35000
CK Boyolali
HARGA HARGA HARGA INDEX
HARGA HARGA SURVEI I
INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp)
(Rp) (Rp) (Rp)
0.00 600
0.00 6000
0.00 250000
0.00 25000
0.00 455000
0.00 55000
0.00 15000
0.00 1490000
0.00 637000
0.00 260000
0.00
CK Boyolali
HARGA SURVEI II INTERNET (Rp)
(Rp)
530.00
CK Boyolali
HARGA SURVEI II INTERNET (Rp)
(Rp)
40000 44000
46000 50600
52000 57200
60000 66000
68000 74800
110000 76000 83600
CK Boyolali
HARGA SURVEI II INTERNET (Rp)
(Rp)
40,000.00
48,000.00
55000
43000
45000
48000
49000
CK Boyolali
HARGA SURVEI II INTERNET (Rp)
(Rp)
50,000.00
60,000.00
65,000.00
75,000.00
85,000.00
90,000.00
100,000.00
CK Boyolali
HARGA SURVEI II INTERNET (Rp)
(Rp)
27,500.00
35,000.00
9,500.00
9,500.00
14,000.00
CK Boyolali
HARGA SURVEI II INTERNET (Rp)
(Rp)
15,000.00
35000
CK Boyolali
HARGA SURVEI II INTERNET (Rp)
(Rp)
59,000.00
100,000.00
140,000.00
CK Boyolali
HARGA SURVEI II INTERNET (Rp)
(Rp)
26,000.00
28,000.00
50,000.00
18,000.00
20000
CK Boyolali
HARGA SURVEI II INTERNET (Rp)
(Rp)
65,000.00
10,000.00
5000
5,000.00
650,000.00
140,000.00
CK Boyolali
HARGA SURVEI II INTERNET (Rp)
(Rp)
15,000.00
13000
CK Boyolali
DAFTAR SEWA PERALATAN
PEKERJAAN :
LOKASI :
TAHUN ANGGARAN :
CK Boyolali
DAFTAR SEWA PERALATAN
KET.
CK Boyolali
REKAPITULASI DAFTAR KUANTITAS DAN HARGA
a b c
I PEKERJAAN PERSIAPAN Rp 52,760,915.34
II. PEKERJAAN BANGUNAN GEDUNG Rp 1,191,054,706.04
A. PEKERJAAN TANAH Rp 62,091,345.87
B. PEKERJAAN PASANGAN DAN PLESTERAN Rp 203,011,985.59
C. PEKERJAAN KERAMIK DAN PELAPIS DINDING Rp 130,471,954.38
D. PEKERJAAN BETON Rp 330,917,526.00
E. PEKERJAAN BESI DAN ATAP Rp 127,747,011.00
F. PEKERJAAN LANGIT - LANGIT Rp 43,219,000.00
G. PEKERJAAN PINTU DAN JENDELA ALUMUNIUM Rp 219,422,580.26
H. PEKERJAAN INSTALASI LISTRIK Rp 26,361,500.00
I. PEKERJAAN SANITASI Rp 15,310,718.57
J. PEKERJAAN CAT - CATAN Rp 32,501,084.36
III. PEKERJAAN PAGAR DAN HALAMAN Rp 268,345,588.29
A. PLAT BETON JALAN MASUK Rp 56,578,789.01
B. PEKERJAAN TANAH Rp 16,486,123.01
C. PEKERJAAN BETON Rp 61,440,660.81
D. PEKERJAAN PASANGAN DAN PLESTERAN Rp 117,723,140.19
E. PEKERJAAN CAT Rp 7,091,875.27
F. PEKERJAAN TANAMAN Rp 9,025,000.00
Jumlah Rp 1,512,161,209.67
PPN 10% Rp 151,216,120.97
Total Anggaran Rp 1,663,377,330.63
Dibulatkan Rp 1,663,377,000.00
Terbilang ;
Surakarta, 2016
Dibuat Oleh ;
CV. / PT
…………………………….
DIREKTUR
I DAFTAR KUANTITAS DAN HARGA
JUMLAH ANGGARAN
Terbilang ;
DAFTAR KUANTITAS DAN HARGA
PEKERJAAN : PEMBANGUNAN KLINIK KARANGANYAR
LOKASI : KARANGANYAR
TAHUN ANGGARAN : 2016
a b c d e=cxd
I PEKERJAAN PERSIAPAN
1 Uitzet dan bouwplank 1.00 Ls Rp 4,500,000.00 Rp 4,500,000.00
2 Papan nama kegiatan 1.00 Ls Rp 750,000.00 Rp 750,000.00
3 Pasang pagar sementara untuk keamanan lokasi proyek 118.00 m' Rp 330,468.88 Rp 38,995,327.84
4 Pembersihan lapangan 630.00 m2 Rp 7,961.25 Rp 5,015,587.50
5 Direksikeet dan brak kerja 1.00 Ls Rp 3,500,000.00 Rp 3,500,000.00
TOTAL I Rp 52,760,915.34
II PEKERJAAN BANGUNAN GEDUNG
A. PEKERJAAN TANAH
1 Galian tanah pondasi batu kali & footplate 248.89 m3 Rp 44,052.53 Rp 10,964,322.30
2 Urugan tanah untuk peninggian lantai 630.00 m3 Rp 72,841.45 Rp 45,890,113.50
3 Urugan tanah kembali 82.96 m3 Rp 11,952.88 Rp 991,658.74
4 Urugan pasir bawah pondasi 10.26 m3 Rp 152,943.45 Rp 1,568,740.97
5 Urugan pasir bawah lantai 17.50 m3 Rp 152,943.45 Rp 2,676,510.38
Surakarta, 2016
Dibuat Oleh ;
CV. / PT
…………………………….
Direktur
DAFTAR HARGA SATUAN PE
TAHUN 2015 KABUPATE
CK Boyolali
NO. KODE URAIAN PEKERJAA
CK Boyolali
NO. KODE URAIAN PEKERJAA
CK Boyolali
NO. KODE URAIAN PEKERJAA
CK Boyolali
NO. KODE URAIAN PEKERJAA
CK Boyolali
NO. KODE URAIAN PEKERJAA
CK Boyolali
NO. KODE URAIAN PEKERJAA
CK Boyolali
NO. KODE URAIAN PEKERJAA
CK Boyolali
NO. KODE URAIAN PEKERJAA
CK Boyolali
NO. KODE URAIAN PEKERJAA
Diperiksa,
KEPALA BIDANG CIPTA KARYA
CK Boyolali
DAFTAR HARGA SATUAN PEKERJAAN GEDUNG
TAHUN 2015 KABUPATEN SUKOHARJO
HARGA SATUAN
URAIAN PEKERJAAN SAT PEKERJAAN
(Rp)
CK Boyolali
HARGA SATUAN
URAIAN PEKERJAAN SAT PEKERJAAN
(Rp)
GA SATUAN PEKERJAAN B E T O N
buat Beton mutu f'c=7,4 Mpa (K100), slum (12±2)cm, w/c = 0,87 m3 774,876.90
buat Beton mutu f'c=9,8 Mpa (K125), slum (12±2)cm, w/c = 0,78 m3 813,765.58
buat Beton mutu f'c=12,2 Mpa (K150), slum (12±2)cm, w/c = 0,72 m3 844,228.23
buat Lantai Kerja Beton mutu f'c=7,4 MPa (K100), slum (3-6)cm, w/c = 0,87 m3 729,443.18
buat Beton mutu f'c=14,5 MPa (K175), slum (12±2)cm, w/c = 0,66 m3 880,297.27
buat Beton mutu f'c=16,9 MPa (K200), slum (12±2)cm, w/c = 0,61 m3 914,670.12
buat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 m3 940,512.71
buat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56 m3 957,424.01
buat Lantai Kerja Beton mutu f'c=24,0 MPa (K275), slum (12±2)cm, w/c = 0,53 m3 986,446.58
buat Beton mutu f'c=26,4 MPa (K300), slum (12±2)cm, w/c = 0,52 m3 995,470.00
buat Beton mutu f'c=28,8 MPa (K325), slum (12±2)cm, w/c = 0,49 m3 1,056,879.57
buat Beton mutu f'c=31,2 MPa (K350), slum (12±2)cm, w/c = 0,48 m3 1,068,677.64
besian dg Besi Polos atau Besi Ulir Kg 12,651.43
asang Bekisting untuk Pondasi m2 134,820.73
asang Bekisting untuk Sloof m2 145,270.73
asang Bekisting untuk Kolom m2 269,547.47
asang Bekisting untuk Balok m2 277,137.47
asang Bekisting untuk Lantai m2 348,747.47
asang Bekisting untuk Dinding m2 303,097.47
asang Bekisting untuk Tangga m2 247,877.47
asang Jembatan Cor m2 85,462.96
buat Pondasi Beton Bertulang (150 kg Besi + Bekisting) m3 3,457,768.82
buat Sloof Beton Bertulang (200 kg Besi + Bekisting) m3 4,266,892.19
buat Kolom Beton Bertulang (300 kg Besi + Bekisting) m3 7,092,027.69
buat Balok Beton Bertulang (200 kg Besi + Bekisting) m3 5,453,115.42
buat plat beton bertulang (150 kg besi + bekisting) m3 5,026,366.95
buat Dinding Beton Bertulang (150 kg Besi + Bekisting) m3 4,801,748.82
buat Dinding Beton Bertulang (200 kg Besi + Bekisting) m3 5,092,332.19
buat Kolom Penguat Beton Bertulang (11 x 11) cm m' 60,411.62
buat Ring Balok Beton Bertulang (10 x 15) cm m' 82,087.23
buat Beton 1Pc : 2Ps : 3Kr m3 909,124.70
buat Beton 1Pc : 3Ps : 6Kr m3 696,804.35
buat Beton 1Pc : 3Ps : 5Kr m3 722,013.60
CK Boyolali
HARGA SATUAN
URAIAN PEKERJAAN SAT PEKERJAAN
(Rp)
CK Boyolali
HARGA SATUAN
URAIAN PEKERJAAN SAT PEKERJAAN
(Rp)
CK Boyolali
HARGA SATUAN
URAIAN PEKERJAAN SAT PEKERJAAN
(Rp)
GA SATUAN PEKERJAAN K A Y U
buatan & Pemasangan Kosen Pintu & Jendela Kayu Jati Kelas II m3 19,556,663.50
buatan & Pemasangan Kosen Pintu & Jendela Kayu Jati Kelas III m3 16,807,631.50
buatan & Pemasangan Kosen Pintu & Jendela Kayu Bengkirai m3 13,963,691.50
buatan & Pemasangan Kosen Pintu & Jendela Kayu Kamfer m3 11,347,583.50
buatan & Pemasangan Kosen Pintu & Jendela Kayu Kruing m3 9,079,691.50
buatan & Pemasangan Pintu Klamp Standard Kayu Jati Kelas II m2 738,576.41
buatan & Pemasangan Pintu Klamp Standard Kayu Jati Kelas III m2 646,937.61
buatan & Pemasangan Pintu Klamp Standard Kayu Bengkirai m2 550,322.41
buatan & Pemasangan Pintu Klamp Standard Kayu Kamfer m2 429,846.01
buatan & Pemasangan Pintu Klamp Standard Kayu Kruing m2 352,322.41
buatan & Pemasangan Daun Pintu Panel, Kayu Jati Kelas II m2 925,284.25
buatan & Pemasangan Daun Pintu Panel, Kayu Jati Kelas III m2 833,645.45
buatan & Pemasangan Daun Pintu Panel, Kayu Bengkirai m2 737,030.25
buatan & Pemasangan Daun Pintu Panel, Kayu Kamfer m2 616,553.85
buatan & Pemasangan Daun Pintu Panel, Kayu Kruing m2 539,030.25
buatan & Pemasangan Pintu & Jendela Kaca Kayu Jati Kelas II m2 610,209.60
buatan & Pemasangan Pintu & Jendela Kaca Kayu Jati Kelas III m2 555,226.32
buatan & Pemasangan Pintu & Jendela Kaca Kayu Bengkirai m2 497,257.20
buatan & Pemasangan Pintu & Jendela Kaca Kayu Kamfer m2 424,971.36
buatan & Pemasangan Pintu & Jendela Kaca Kayu Kruing m2 378,457.20
buatan & Pemasangan Pintu & Jendela Jalusi Kayu Jati Kelas II m2 1,310,156.65
buatan & Pemasangan Pintu & Jendela Jalusi Kayu Jati Kelas III m2 1,163,534.57
buatan & Pemasangan Pintu & Jendela Jalusi Kayu Bengkirai m2 1,008,950.25
buatan & Pemasangan Pintu & Jendela Jalusi Kayu Kamfer m2 816,188.01
buatan & Pemasangan Pintu & Jendela Jalusi Kayu Kruing m2 692,150.25
uatan&Pemasangan Pintu kayu lapis (Plywood) Rangkap rangka Kayu Jati Klas II (lbr s/d 90 cm) m2 660,722.43
uatan&Pemasangan Pintu kayu lapis (Plywood) Rangkap rangka Kayu Jati Klas III (lbr s/d 90 cm) m2 603,448.18
uatan&Pemasangan Pintu kayu lapis (Plywood) Rangkap rangka Kayu Bengkirai (lbr s/d 90 cm) m2 543,063.68
uatan&Pemasangan Pintu kayu lapis (Plywood) Rangkap rangka Kayu Kamfer (lbr s/d 90 cm) m2 467,765.93
uatan&Pemasangan Pintu kayu lapis (Plywood) Rangkap rangka Kayu Kruing (lbr s/d 90 cm) m2 419,313.68
buatan&Pemasangan Pintu Plywood rangkap, rangka expose kayu Jati kelas II m2 697,863.76
buatan&Pemasangan Pintu Plywood rangkap, rangka expose kayu Jati kelas III m2 639,214.93
CK Boyolali
HARGA SATUAN
URAIAN PEKERJAAN SAT PEKERJAAN
(Rp)
CK Boyolali
HARGA SATUAN
URAIAN PEKERJAAN SAT PEKERJAAN
(Rp)
CK Boyolali
HARGA SATUAN
URAIAN PEKERJAAN SAT PEKERJAAN
(Rp)
CK Boyolali
HARGA SATUAN
URAIAN PEKERJAAN SAT PEKERJAAN
(Rp)
CK Boyolali
HARGA SATUAN
URAIAN PEKERJAAN SAT PEKERJAAN
(Rp)
m termasuk PPN
Sukoharjo, 2015
Direncana
KASI BINA TEKNIS
BIDANG CIPTA KARYA
Mengetahui
KEPALA DINAS PEKERJAAN UMUM
KABUPATEN SUKOHARJO
CK Boyolali
DAFTAR UPAH PEKERJA
TAHUN 2015 KABUPATEN SUKOHARJO
1 Pekerja Hr
2 Mandor Hr
3 Tukang listrik Hr
4 Tukang kayu Hr
5 Kep. tk. kayu Hr
6 Tukang batu Hr
7 Kep. tk. batu Hr
8 Tukang besi Hr
9 Kep. tk. besi Hr
10 Tukang cat Hr
11 Kep. tk. cat Hr
12 Tukang plitur Hr
13 Tukang jalan Hr
14 Tukang gali Hr
15 Tukang masak aspal Hr
16 Tk. leideng Hr
17 Masinis Hr
18 Pemb. Masinis Hr
19 Penjaga api Hr
20 Penjaga malam Hr
21 Sopir Hr
22 Pembantu Sopir Hr
Sukoharjo, 2015
Diperiksa, Direncana
KEPALA BIDANG CIPTA KARYA KASI BINA TEKNIS
BIDANG CIPTA KARYA
CK Boyolali
DAFTAR UPAH PEKERJA
TAHUN 2015 KABUPATEN SUKOHARJO
HARGA (Rp)
41,400.00
61,950.00
61,950.00
61,950.00
66,100.00
57,850.00
66,100.00
57,850.00
66,100.00
57,850.00
66,100.00
57,850.00
57,850.00
57,850.00
57,850.00
57,850.00
61,950.00
49,550.00
49,550.00
49,550.00
49,550.00
41,300.00
Sukoharjo, 2015
Mengetahui
KEPALA DINAS PEKERJAAN UMUM
KABUPATEN SUKOHARJO
CK Boyolali
DAFTAR HARGA SATUAN BAHAN B
TAHUN 2015 KABUPATEN SUKOH
NO. J E N I S B A H A N
I BAHAN DASAR
1 BATU KALI Bulat Belah
Pecah
Pecah
Pecah
2 KERIKIL Timbunan Pilihan
Sawur / Koral
Beton
Beton
Beton
3 BATU BATA
4 PASIR Urug
Pasang
Beton
5 TANAH Padas
6 KAPUR Pasang
7 PORTLAND CEMENT
Portland Cement
Semen warna
CK Boyolali
NO. J E N I S B A H A N
. 240 cm X 105 cm X 4 mm
. 270 cm X 105 cm X 4 mm
. 300 cm X 105 cm X 4 mm
.(2,25x0,92 m) x 5 mm
(2,00x0,92 m) x 5 mm
4 NOK Jabes nok
. Stel Besar
5 ASBES PLAT . 100cm X 100 cm X 3 mm
6 SENG PLAT BJLS 0,28 lebar 55 cm
BJLS 0,30 lebar 60 cm
BJLS 0,30 lebar 90 cm
7 SENG GELOMBANG
BJLS 0,20 panjang 180 cm
BJLS 0,30 panjang 180 cm
BJLS 0,30 panjang 240 cm
Seng gelombang 3 x 6" BJLS.20, 2,4 x
CK Boyolali
NO. J E N I S B A H A N
2 KAMPER Papan
Balok/pesagen
3 KRUING Papan
Balok/pesagen
4 MERANTI Papan
Balok/pesagen
6 BENGKIRAI Papan
Balok/pesagen
7 SENGON Papan
Balok/pesagen
CK Boyolali
NO. J E N I S B A H A N
5 Batu Candi
6 Batu andesit
7 Batu andesit alur
8 GRANITO 40 x 40 cm
9 Marmer
10 Batu candi
V.BAHAN CETAK
1 BUIS BETON Ø 10 cm - 100 cm
Ø 20 cm - 100 cm
Ø 30 cm - 100 cm
Ø 40 cm - 100 cm
Ø 50 cm - 100 cm
Ø 60 cm - 100 cm
Ø 100 cm - 100 cm
Ø 80 cm - 50 cm
Ø 90 cm - 50 cm
Ø 100 cm - 50 cm
U 20 cm - 100 cm
U 30 cm - 100 cm
CK Boyolali
NO. J E N I S B A H A N
IV BAHAN PIPA
1 Pipa PVC SII SCJ , S - 12,5 (10 bar)
Pipa PVC DN 20 ( ½" ) AW JIS
Pipa PVC DN 25 ( ¾" ) AW JIS
Pipa PVC DN 32 ( 1" ) AW JIS
Pipa PVC DN 40 ( 1½" )
Pipa PVC DN 63 ( 2" )
Pipa PVC DN 110 ( 4" )
Pipa PVC Ø 4" (AW - SCJ) 4 m
Pipa PVC Ø 2" (AW - SCJ) 4 m
Pipa PVC Ø 1 1/2" (AW - SCJ) 4 m
Pipa PVC Ø 1" (AW - SCJ) 4 m
Pipa PVC Ø 3/4" (AW - SCJ) 4 m
Pipa PVC Ø 1/2" (AW - SCJ) 4 m
5 PLY WOOD
Teak wood
CK Boyolali
NO. J E N I S B A H A N
. 120 X 240 X 3 mm
. 90 X 210 X 4 mm
Tripleks
. 120 X 240 X 3 mm
. 120 X 240 X 4 mm
Multipleks
. 120 X 240 X 9 mm
. 120 X 240 X 12 mm
Formika ukuran pintu
Eternit
GRC (1,2 x 2,4 m2 tb 4 mm)
Plywood tebal 4 mm uk.90x220cm
Plywood tebal 4 mm uk.120x240cm
VI BAHAN FINISHING
1 KAYU
Menie
Dempul plamur
Ambril/amplas
Cat dasar
- Koas
. Plitur jadi
. Vernis
CK Boyolali
NO. J E N I S B A H A N
2 TEMBOK
Plamur
Cat tembok
3 BESI
Menie
Cat
Minyak cat
Residu (teer/aspal)
Lem Aica Aibon
VII B A H A N K A C A
1 POLOS 3 mm
5 mm
2 RAY BAND 5 mm
Kuda :
IX BAHAN SANITAIR
1 KLOSET DUDUK
2 KLOSET JONGKOK
3 WASTAFEL GANTUNG BULAT
4 URINOIR KERAMIK STANDART
5 BAK MANDI FIBRE GLASS 70.70.80
6 LAIN - LAIN
Kran Air 3/4"
Seal tape
Floor drain
Bak Cuci Piring
Water drain
CK Boyolali
NO. J E N I S B A H A N
XIII L A I N - L A I N
1 Naco rayban 5 mm per Daun
2 Naco bening 5 mm per Daun
3 Rolling door Besi
4 Rolling door Almunium
5 Kusen Almunium 4" Putih
6 Kusen Almunium 4" Coklat
7 Besi Holo rangka gypsum
8 Minyak Beton & bekisting
9 Pintu Lipat Besi 0.8 mm
10 Soda api
11 Air
12 Solar (Industri)
13 Premium (Industri)
14 Pelumas
Diperiksa,
KEPALA BIDANG CIPTA KARYA
CK Boyolali
NO. J E N I S B A H A N
CK Boyolali
DAFTAR HARGA SATUAN BAHAN BANGUNAN
TAHUN 2015 KABUPATEN SUKOHARJO
bh 400.00
Nok kerpus plentong super bh 2,400.00
Kerpus press beton bh 4,900.00
Kerpus press mantili bh 5,700.00
Kerpus press tipe soka kebumen bh 5,700.00
Genteng soka kebumen plentong besar bh 2,500.00
Genteng soka kebumen plentong kecil bh 1,700.00
Genteng press mantili besar bh 1,950.00
Genteng press mantili kecil bh 1,350.00
CK Boyolali
J E N I S B A H A N SATUAN HARGA (Rp)
CK Boyolali
J E N I S B A H A N SATUAN HARGA (Rp)
m3 7,561,900.00
Balok/pesagen m3 7,318,100.00
m3 5,800,000.00
Balok/pesagen m3 5,600,000.00
m3 4,600,000.00
Balok/pesagen m3 4,100,000.00
m3
Balok/pesagen m3 1,900,000.00
m3 10,300,000.00
Balok/pesagen m3 9,300,000.00
m3 3,000,000.00
Balok/pesagen m3 2,300,000.00
30 X 30 cm polos m2 45,000.00
40 X 40 cm polos m2 48,000.00
20 X 20 cm KM/WC m2 42,100.00
Keramik anti slip 40/40 m2 60,000.00
Keramik warna pola 30/30 m2 42,100.00
Keramik warna pola 40/40 m2 59,000.00
Keramik dinding 20/25 m2 44,600.00
Keramik dinding 20/20 m2 44,600.00
Keramik dinding list 5/20 bh 4,000.00
Keramik plin 10/20 bh 3,000.00
m2 110,000.00
m2 160,000.00
m2 35,000.00
CK Boyolali
J E N I S B A H A N SATUAN HARGA (Rp)
m2 99,100.00
m2 150,000.00
m2 170,000.00
40 x 40 cm m2 157,000.00
m2 98,000.00
m2 99,100.00
10 cm - 100 cm bh
20 cm - 100 cm bh 27,250.00
30 cm - 100 cm bh 42,100.00
40 cm - 100 cm bh 52,000.00
50 cm - 100 cm bh 77,650.00
60 cm - 100 cm bh 115,700.00
100 cm - 100 cm bh 229,700.00
80 cm - 50 cm bh 78,500.00
90 cm - 50 cm bh 86,700.00
100 cm - 50 cm bh 114,800.00
20 cm - 100 cm bh 37,150.00
30 cm - 100 cm bh 47,100.00
bh 6,000.00
CK Boyolali
J E N I S B A H A N SATUAN HARGA (Rp)
kg 23,100.00
bh 18,100.00
bh 750.00
bh 50,000.00
m2 95,000.00
btg 14,800.00
btg 20,600.00
btg 28,900.00
btg 24,700.00
btg 48,700.00
btg 152,800.00
btg 152,800.00
btg 48,700.00
btg 24,700.00
btg 28,900.00
btg 20,600.00
btg 14,800.00
btg 88,800.00
btg 108,600.00
btg 163,200.00
btg 287,400.00
btg 565,200.00
btg 832,800.00
m' 6,600.00
lbr 60,000.00
m1 16,250.00
m2 22,500.00
CK Boyolali
J E N I S B A H A N SATUAN HARGA (Rp)
lbr 80,000.00
lbr 52,800.00
lbr 52,800.00
lbr 62,800.00
lbr 109,000.00
X 12 mm lbr 138,800.00
lbr 75,000.00
m2 17,300.00
(1,2 x 2,4 m2 tb 4 mm) lbr
lbr 52,800.00
lbr 80,000.00
kg 28,900.00
kg 13,200.00
lbr 5,700.00
kg 62,800.00
bh 7,400.00
ltr 42,100.00
ltr 42,100.00
CK Boyolali
J E N I S B A H A N SATUAN HARGA (Rp)
kg 13,200.00
kg 16,000.00
kg 27,250.00
kg 50,000.00
ltr 14,000.00
drum 296,000.00
kg 15,700.00
m2 57,000.00
m2 78,000.00
m2 89,000.00
1 X slag bh 49,500.00
2 X slag bh 131,400.00
2 X slag bh 49,500.00
bh
bh 8,200.00
bh 3,300.00
bh 2,400.00
bh
bh 961,900.00
bh 125,600.00
bh 261,900.00
bh 1,151,200.00
bh 261,900.00
bh 19,800.00
bh 3,300.00
bh 3,300.00
bh 230,500.00
bh 50,000.00
CK Boyolali
J E N I S B A H A N SATUAN HARGA (Rp)
kg 14,000.00
kg 18,100.00
bh 250.00
bh 15,700.00
kg 2,000.00
kg 15,500.00
BH 2,400.00
m2 37,100.00
m2 49,500.00
m2 37,100.00
m2 49,500.00
m2 60,000.00
m2 85,500.00
m2 65,000.00
m2 90,500.00
bh 82,000.00
bh 91,000.00
m2 285,000.00
m2 443,000.00
m' 165,000.00
m' 125,000.00
m1 6,250.00
ltr 14,000.00
m2 545,400.00
kg 27,200.00
m3 72,500.00
ltr 6,400.00
ltr 6,700.00
ltr 15,700.00
Sukoharjo, 2015
Direncana
KASI BINA TEKNIS
BIDANG CIPTA KARYA
CK Boyolali
J E N I S B A H A N SATUAN HARGA (Rp)
Mengetahui
KEPALA DINAS PEKERJAAN UMUM
KABUPATEN SUKOHARJO
CK Boyolali
DAFTAR ANALISA PEKERJAAN GEDUNG PROYEK
TAHUN 2015 KABUPATEN SUKOHARJO
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
ALISA PEKERJAAN GEDUNG PROYEK
UN 2015 KABUPATEN SUKOHARJO
HARGA JUMLAH
BAHAN/UPAH
Rp Rp
330,468.88
35,621.00
41,400.00 8,280.00
61,950.00 24,780.00
66,100.00 1,322.00
61,950.00 1,239.00
264,805.25
18,000.00 22,500.00
1,337.50 3,343.75
47,900.00 57,480.00
185,000.00 925.00
206,000.00 1,854.00
2,300,000.00 165,600.00
14,000.00 840.00
27,250.00 12,262.50
300,426.25
30,042.63
330,468.88
104,374.33
11,305.75
41,400.00 4,140.00
61,950.00 6,195.00
66,100.00 661.00
61,950.00 309.75
83,580.00
5,600,000.00 67,200.00
14,000.00 280.00
2,300,000.00 16,100.00
94,885.75
9,488.58
104,374.33
1,001,657.80
287,477.50
41,400.00 82,800.00
61,950.00 123,900.00
57,850.00 57,850.00
66,100.00 19,830.00
61,950.00 3,097.50
CK Boyolali
HARGA JUMLAH
BAHAN/UPAH
Rp Rp
623,120.50
18,000.00 22,500.00
2,300,000.00 414,000.00
14,000.00 1,120.00
4,100.00 4,510.00
1,337.50 46,812.50
185,000.00 27,750.00
185,000.00 18,500.00
206,000.00 30,900.00
650.00 19,500.00
23,900.00 5,975.00
82,000.00 16,400.00
57,000.00 4,560.00
49,500.00 7,425.00
52,800.00 3,168.00
910,598.00
91,059.80
1,001,657.80
CK Boyolali
HARGA JUMLAH
BAHAN/UPAH
Rp Rp
887,849.88
181,617.50
41,400.00 41,400.00
61,950.00 123,900.00
66,100.00 13,220.00
61,950.00 3,097.50
625,518.75
18,000.00 30,600.00
2,300,000.00 483,000.00
14,000.00 4,200.00
1,337.50 14,043.75
185,000.00 5,550.00
206,000.00 10,300.00
47,900.00 71,850.00
23,900.00 5,975.00
807,136.25
80,713.63
887,849.88
7,961.25
7,237.50
41,400.00 4,140.00
61,950.00 3,097.50
7,237.50
723.75
7,961.25
253,536.80
20,568.00
61,950.00 18,585.00
66,100.00 1,983.00
209,920.00
5,800,000.00 208,800.00
5,600,000.00 -
14,000.00 1,120.00
230,488.00
23,048.80
253,536.80
CK Boyolali
HARGA JUMLAH
BAHAN/UPAH
Rp Rp
218,338.45
181,617.50
41,400.00 41,400.00
61,950.00 123,900.00
66,100.00 13,220.00
61,950.00 3,097.50
16,872.00
13,200.00 16,500.00
2,000.00 372.00
198,489.50
19,848.95
218,338.45
652,614.93
593,286.30
41,400.00 552,027.60
61,950.00 41,258.70
CK Boyolali
HARGA JUMLAH
BAHAN/UPAH
Rp Rp
593,286.30
59,328.63
652,614.93
305,863.97
278,058.15
41,400.00 276,013.80
61,950.00 2,044.35
278,058.15
27,805.82
305,863.97
52,354.50
47,595.00
41,400.00 41,400.00
61,950.00 6,195.00
47,595.00
4,759.50
52,354.50
Untuk 1 m2 5,235.45
67,801.25
61,637.50
41,400.00 41,400.00
61,950.00 15,487.50
66,100.00 1,652.50
61,950.00 3,097.50
61,637.50
6,163.75
67,801.25
Untuk 1 m2 6,780.12
143,144.10
130,131.00
CK Boyolali
HARGA JUMLAH
BAHAN/UPAH
Rp Rp
41,400.00 82,800.00
61,950.00 37,170.00
66,100.00 3,966.00
61,950.00 6,195.00
130,131.00
13,013.10
143,144.10
Untuk 1 m2 14,314.41
15,922.50
14,475.00
41,400.00 8,280.00
61,950.00 6,195.00
14,475.00
1,447.50
15,922.50
Untuk 1 m2 1,592.25
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
HARGA JUMLAH
URAIAN PEKERJAAN BAHAN/UPAH
Rp Rp
35,858.63
32,598.75
41,400.00 31,050.00
61,950.00 1,548.75
32,598.75
10% 3,259.88
35,858.63
44,052.53
40,047.75
41,400.00 37,260.00
61,950.00 2,787.75
40,047.75
10% 4,004.78
44,052.53
52,382.72
47,620.65
41,400.00 43,470.00
61,950.00 4,150.65
47,620.65
10% 4,762.07
52,382.72
47,720.64
43,382.40
41,400.00 41,400.00
61,950.00 1,982.40
43,382.40
10% 4,338.24
47,720.64
72,398.70
65,817.00
41,400.00 62,100.00
61,950.00 3,717.00
65,817.00
10% 6,581.70
72,398.70
57,714.53
CK Boyolali
HARGA JUMLAH
URAIAN PEKERJAAN BAHAN/UPAH
Rp Rp
52,467.75
41,400.00 49,680.00
61,950.00 2,787.75
52,467.75
10% 5,246.78
57,714.53
2,617.73
2,379.75
41,400.00 2,070.00
61,950.00 309.75
2,379.75
10% 237.98
2,617.73
15,709.65
14,281.50
41,400.00 13,662.00
61,950.00 619.50
14,281.50
10% 1,428.15
15,709.65
CK Boyolali
HARGA JUMLAH
URAIAN PEKERJAAN BAHAN/UPAH
Rp Rp
11,952.88
rugan Kembali di hitung dari 1/3 kali koefisien Pekerjaan galian
10,866.25
41,400.00 10,350.00
61,950.00 516.25
10,866.25
10% 1,086.63
11,952.88
26,177.25
23,797.50
41,400.00 20,700.00
61,950.00 3,097.50
23,797.50
10% 2,379.75
26,177.25
152,943.45
13,039.50
41,400.00 12,420.00
61,950.00 619.50
126,000.00
105,000.00 126,000.00
139,039.50
10% 13,903.95
152,943.45
19,139.25
10% 1,913.93
21,053.18
163,568.63
11,898.75
41,400.00 10,350.00
61,950.00 1,548.75
136,800.00
114,000.00 136,800.00
148,698.75
CK Boyolali
HARGA JUMLAH
URAIAN PEKERJAAN BAHAN/UPAH
Rp Rp
10% 14,869.88
163,568.63
72,841.45
10,969.50
41,400.00 10,350.00
61,950.00 619.50
55,250.00
42,500.00 55,250.00
66,219.50
10% 6,621.95
72,841.45
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAA
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAA
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAA
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAA
CK Boyolali
HARGA JUMLAH
URAIAN PEKERJAAN BAHAN/UPAH
Rp Rp
HARGA SATUAN PEKERJAAN PONDASI
Pemasangan Pondasi Batu Belah 1SP : 3 PP 773,290.38
115,091.25
41,400.00 62,100.00
57,850.00 43,387.50
66,100.00 4,957.50
61,950.00 4,646.25
587,900.00
190,000.00 228,000.00
1,337.50 270,175.00
185,000.00 89,725.00
702,991.25
10% 70,299.13
Harga Satuan Pekerjaan (D+E) 773,290.38
657,303.75
10% 65,730.38
Harga Satuan Pekerjaan (D+E) 723,034.13
625,631.25
10% 62,563.13
Harga Satuan Pekerjaan (D+E) 688,194.38
CK Boyolali
HARGA JUMLAH
URAIAN PEKERJAAN BAHAN/UPAH
Rp Rp
HARGA SATUAN PEKERJAAN PONDASI
488,272.50
190,000.00 228,000.00
1,337.50 156,487.50
185,000.00 103,785.00
603,363.75
10% 60,336.38
Harga Satuan Pekerjaan (D+E) 663,700.13
572,843.75
10% 57,284.38
Harga Satuan Pekerjaan (D+E) 630,128.13
CK Boyolali
HARGA JUMLAH
URAIAN PEKERJAAN BAHAN/UPAH
Rp Rp
HARGA SATUAN PEKERJAAN PONDASI
544,804.75
10% 54,480.48
Harga Satuan Pekerjaan (D+E) 599,285.23
520,621.75
10% 52,062.18
Harga Satuan Pekerjaan (D+E) 572,683.93
333,207.45
10% 33,320.75
Harga Satuan Pekerjaan (D+E) 366,528.20
Pasang Pondasi Siklop, 60% Beton Camp. 1PC : 2PB : 3KR & 40% Batu Belah 2,199,060.05
206,082.50
41,400.00 140,760.00
57,850.00 49,172.50
66,100.00 5,618.50
61,950.00 10,531.50
1,793,063.00
190,000.00 91,200.00
10,000.00 1,260,000.00
1,337.50 259,475.00
185,000.00 57,720.00
206,000.00 96,408.00
15,700.00 28,260.00
1,999,145.50
10% 199,914.55
CK Boyolali
HARGA JUMLAH
URAIAN PEKERJAAN BAHAN/UPAH
Rp Rp
HARGA SATUAN PEKERJAAN PONDASI
Harga Satuan Pekerjaan (D+E) 2,199,060.05
657,403.05
10% 65,740.31
Harga Satuan Pekerjaan (D+E) 723,143.36
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
3 A.4.1.1.3 1.00 m3 Membuat Beton mutu f'c=12,2 Mpa (K150), slum (12±2)cm
A Tenaga
L.01 1.650 OH Pekerja
L.02 0.275 OH Tukang Batu
L.03 0.028 OH Kepala Tukang
L.04 0.083 OH Mandor
B Bahan
299.000 Kg Portland Semen
799.000 kg Pasir Beton
1017.000 kg Kerikil (maksimum 30 mm)
215.000 ltr Air
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
4 A.4.1.1.4 1.00 m3 Membuat Lantai Kerja Beton mutu f'c=7,4 MPa (K100), slu
A Tenaga
L.01 1.200 OH Pekerja
L.02 0.200 OH Tukang Batu
L.03 0.020 OH Kepala Tukang
L.04 0.060 OH Mandor
B Bahan
230.000 Kg Portland Semen
893.000 kg Pasir Beton
1027.000 kg Kerikil (maksimum 30 mm)
200.000 ltr Air
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
HARGA JUMLAH
PEKERJAAN BAHAN/UPAH
Rp Rp
704,433.54
10% 70,443.35
774,876.90
0.10
Mpa (K125), slum (12±2)cm, w/c = 0,78 813,765.58
91,211.40
41,400.00 68,310.00
57,850.00 15,908.75
66,100.00 1,850.80
61,950.00 5,141.85
648,575.49
1,337.50 369,150.00
132.14 109,414.29
152.59 154,423.70
72.50 15,587.50
739,786.89
10% 73,978.69
813,765.58
767,480.21
10% 76,748.02
CK Boyolali
HARGA JUMLAH
PEKERJAAN BAHAN/UPAH
Rp Rp
844,228.23
663,130.16
10% 66,313.02
729,443.18
CK Boyolali
HARGA JUMLAH
PEKERJAAN BAHAN/UPAH
Rp Rp
800,270.25
10% 80,027.02
880,297.27
831,518.29
10% 83,151.83
914,670.12
855,011.56
10% 85,501.16
940,512.71
CK Boyolali
HARGA JUMLAH
PEKERJAAN BAHAN/UPAH
Rp Rp
152.59 158,543.70
72.50 15,587.50
870,385.46
10% 87,038.55
957,424.01
896,769.61
10% 89,676.96
986,446.58
CK Boyolali
HARGA JUMLAH
PEKERJAAN BAHAN/UPAH
Rp Rp
813,761.32
1,337.50 552,387.50
132.14 89,989.29
152.59 155,797.04
72.50 15,587.50
904,972.72
10% 90,497.27
995,470.00
960,799.61
10% 96,079.96
1,056,879.57
971,525.13
10% 97,152.51
1,068,677.64
126,514.30
7,658.00
41,400.00 2,898.00
57,850.00 4,049.50
CK Boyolali
HARGA JUMLAH
PEKERJAAN BAHAN/UPAH
Rp Rp
66,100.00 462.70
61,950.00 247.80
107,355.00
10,000.00 105,000.00
15,700.00 2,355.00
115,013.00
10% 11,501.30
126,514.30
untuk 1 Kg 12,651.43
134,820.73
40,964.30
41,400.00 21,528.00
61,950.00 16,107.00
66,100.00 1,718.60
61,950.00 1,610.70
81,600.00
1,900,000.00 76,000.00
14,000.00 4,200.00
14,000.00 1,400.00
122,564.30
10% 12,256.43
134,820.73
145,270.73
40,964.30
41,400.00 21,528.00
61,950.00 16,107.00
66,100.00 1,718.60
61,950.00 1,610.70
CK Boyolali
HARGA JUMLAH
PEKERJAAN BAHAN/UPAH
Rp Rp
91,100.00
1,900,000.00 85,500.00
14,000.00 4,200.00
14,000.00 1,400.00
132,064.30
10% 13,206.43
145,270.73
269,547.47
51,993.15
41,400.00 27,324.00
61,950.00 20,443.50
66,100.00 2,181.30
61,950.00 2,044.35
193,050.00
1,900,000.00 76,000.00
14,000.00 5,600.00
14,000.00 2,800.00
2,300,000.00 34,500.00
109,000.00 38,150.00
18,000.00 36,000.00
245,043.15
10% 24,504.32
269,547.47
277,137.47
51,993.15
41,400.00 27,324.00
61,950.00 20,443.50
66,100.00 2,181.30
61,950.00 2,044.35
199,950.00
1,900,000.00 76,000.00
14,000.00 5,600.00
14,000.00 2,800.00
2,300,000.00 41,400.00
109,000.00 38,150.00
18,000.00 36,000.00
251,943.15
10% 25,194.32
277,137.47
348,747.47
CK Boyolali
HARGA JUMLAH
PEKERJAAN BAHAN/UPAH
Rp Rp
51,993.15
41,400.00 27,324.00
61,950.00 20,443.50
66,100.00 2,181.30
61,950.00 2,044.35
265,050.00
1,900,000.00 76,000.00
14,000.00 5,600.00
14,000.00 2,800.00
2,300,000.00 34,500.00
109,000.00 38,150.00
18,000.00 108,000.00
317,043.15
10% 31,704.32
348,747.47
303,097.47
51,993.15
41,400.00 27,324.00
61,950.00 20,443.50
66,100.00 2,181.30
61,950.00 2,044.35
223,550.00
1,900,000.00 57,000.00
14,000.00 5,600.00
14,000.00 2,800.00
2,300,000.00 46,000.00
109,000.00 38,150.00
18,000.00 54,000.00
5,000.00 20,000.00
CK Boyolali
HARGA JUMLAH
PEKERJAAN BAHAN/UPAH
Rp Rp
275,543.15
10% 27,554.32
303,097.47
247,877.47
51,993.15
41,400.00 27,324.00
61,950.00 20,443.50
66,100.00 2,181.30
61,950.00 2,044.35
173,350.00
1,900,000.00 57,000.00
14,000.00 5,600.00
14,000.00 2,100.00
2,300,000.00 34,500.00
109,000.00 38,150.00
18,000.00 36,000.00
225,343.15
10% 22,534.32
247,877.47
85,462.96
10,133.60
41,400.00 6,210.00
61,950.00 3,097.50
66,100.00 330.50
61,950.00 495.60
67,560.00
1,900,000.00 50,160.00
14,000.00 8,400.00
18,000.00 9,000.00
77,693.60
10% 7,769.36
85,462.96
CK Boyolali
HARGA JUMLAH
PEKERJAAN BAHAN/UPAH
Rp Rp
2,733,085.00
1,900,000.00 380,000.00
14,000.00 21,000.00
14,000.00 5,600.00
10,000.00 1,575,000.00
15,700.00 35,325.00
1,337.50 449,400.00
185,000.00 99,900.00
206,000.00 166,860.00
3,143,426.20
10% 314,342.62
3,457,768.82
CK Boyolali
HARGA JUMLAH
PEKERJAAN BAHAN/UPAH
Rp Rp
3,878,992.90
10% 387,899.29
4,266,892.19
6,447,297.90
10% 644,729.79
7,092,027.69
CK Boyolali
HARGA JUMLAH
PEKERJAAN BAHAN/UPAH
Rp Rp
206,000.00 166,860.00
2,300,000.00 322,000.00
109,000.00 305,200.00
18,000.00 288,000.00
4,957,377.65
10% 495,737.77
5,453,115.42
4,569,424.50
10% 456,942.45
5,026,366.95
CK Boyolali
HARGA JUMLAH
PEKERJAAN BAHAN/UPAH
Rp Rp
4,365,226.20
10% 436,522.62
4,801,748.82
CK Boyolali
HARGA JUMLAH
PEKERJAAN BAHAN/UPAH
Rp Rp
4,629,392.90
10% 462,939.29
5,092,332.19
54,919.65
10% 5,491.97
60,411.62
CK Boyolali
HARGA JUMLAH
PEKERJAAN BAHAN/UPAH
Rp Rp
54,876.25
1,900,000.00 5,700.00
14,000.00 280.00
10,000.00 36,000.00
15,700.00 785.00
1,337.50 7,356.25
185,000.00 1,665.00
206,000.00 3,090.00
74,624.75
10% 7,462.48
82,087.23
909,124.70
110,317.00
41,400.00 82,800.00
57,850.00 20,247.50
66,100.00 2,313.50
61,950.00 4,956.00
716,160.00
1,337.50 449,400.00
185,000.00 99,900.00
206,000.00 166,860.00
826,477.00
10% 82,647.70
909,124.70
696,804.35
89,381.00
41,400.00 68,310.00
57,850.00 14,462.50
66,100.00 1,652.50
61,950.00 4,956.00
544,077.50
1,337.50 263,487.50
185,000.00 86,950.00
206,000.00 193,640.00
633,458.50
10% 63,345.85
696,804.35
722,013.60
89,381.00
41,400.00 68,310.00
CK Boyolali
HARGA JUMLAH
PEKERJAAN BAHAN/UPAH
Rp Rp
57,850.00 14,462.50
66,100.00 1,652.50
61,950.00 4,956.00
566,995.00
1,337.50 291,575.00
185,000.00 96,200.00
206,000.00 179,220.00
656,376.00
10% 65,637.60
722,013.60
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
17 A.4.2.1.18a 1 m' Pemasangan Talang 1/2 Lingkaran Ø 15 cm, Seng Plaat BJL
A Tenaga
L.01 0.15 OH Pekerja
L.02 0.3 OH Tukang Kayu
L.03 0.03 OH Kepala Tukang
L.04 0.008 OH Mandor
B Bahan
1.05 m' Seng Plaat BJLS 30 Lebar 60 cm
0.01 Kg Paku Biasa 1 - 2,5 cm
0.5 Kg Besi strip
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
BESI & ALLUMUNIUM
23,537.20
6,537.45
41,400.00 2,484.00
57,850.00 3,471.00
66,100.00 396.60
61,950.00 185.85
14,860.00
11,500.00 13,225.00
27,250.00 1,635.00
21,397.45
10% 2,139.75
23,537.20
25,913.20
6,537.45
41,400.00 2,484.00
57,850.00 3,471.00
66,100.00 396.60
61,950.00 185.85
17,020.00
14,800.00 17,020.00
23,557.45
10% 2,355.75
25,913.20
422,654.40
10% 42,265.44
464,919.84
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
BESI & ALLUMUNIUM
23,836.01
3,069.10
41,400.00 1,656.00
57,850.00 1,157.00
66,100.00 132.20
61,950.00 123.90
18,600.00
26,000.00 10,400.00
6,400.00 1,920.00
15,700.00 6,280.00
21,669.10
10% 2,166.91
23,836.01
Untuk 1 cm 2,383.60
453,644.07
127,403.70
41,400.00 49,680.00
57,850.00 69,420.00
66,100.00 7,932.00
61,950.00 371.70
285,000.00
285,000.00 285,000.00
412,403.70
10% 41,240.37
453,644.07
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
BESI & ALLUMUNIUM
ding Door) 0.8 mm 652,675.43
47,941.30
41,400.00 18,216.00
57,850.00 25,454.00
66,100.00 2,908.40
61,950.00 1,362.90
545,400.00
545,400.00 545,400.00
593,341.30
10% 59,334.13
652,675.43
607,153.25
108,957.50
41,400.00 41,400.00
57,850.00 57,850.00
66,100.00 6,610.00
61,950.00 3,097.50
443,000.00
443,000.00 443,000.00
551,957.50
10% 55,195.75
607,153.25
190,682.08
10% 19,068.21
209,750.28
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
BESI & ALLUMUNIUM
4,682.08
41,400.00 1,780.20
57,850.00 2,487.55
66,100.00 284.23
61,950.00 130.10
142,000.00
125,000.00 137,500.00
750.00 1,500.00
50,000.00 3,000.00
146,682.08
10% 14,668.21
161,350.28
771,340.90
10% 77,134.09
848,474.99
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
BESI & ALLUMUNIUM
ka Allumunium Coklat 654,874.99
9,340.90
41,400.00 3,519.00
57,850.00 4,917.25
66,100.00 594.90
61,950.00 309.75
586,000.00
125,000.00 550,000.00
5,000.00 22,500.00
50,000.00 13,500.00
595,340.90
10% 59,534.09
654,874.99
133,166.10
10% 13,316.61
146,482.71
273,909.39
181,928.05
41,400.00 69,138.00
57,850.00 96,609.50
66,100.00 11,038.70
61,950.00 5,141.85
67,080.49
410.00 2,532.57
2,383.60 64,547.92
249,008.54
10% 24,900.85
273,909.39
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
BESI & ALLUMUNIUM
yban 5 mm & Tralis 129,386.35
22,053.95
41,400.00 8,280.00
61,950.00 12,390.00
66,100.00 1,322.00
61,950.00 61.95
95,570.00
82,000.00 90,200.00
250.00 2,500.00
410.00 2,870.00
117,623.95
10% 11,762.40
129,386.35
127,523.95
10% 12,752.40
140,276.35
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
BESI & ALLUMUNIUM
rai , Seng BJLS 30 Lebar 90 cm 161,322.15
22,611.50
41,400.00 8,280.00
61,950.00 12,390.00
66,100.00 1,322.00
61,950.00 619.50
124,045.00
34,700.00 36,435.00
14,000.00 210.00
4,600,000.00 87,400.00
146,656.50
10% 14,665.65
161,322.15
54,558.60
10% 5,455.86
60,014.46
71,020.35
10% 7,102.04
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
BESI & ALLUMUNIUM
78,122.39
88,166.10
10% 8,816.61
96,982.71
CK Boyolali
238,360.00
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
HARGA JUMLAH
N PEKERJAAN BAHAN/UPAH
Rp Rp
ASANGAN DINDING
rah ukuran (5x11x22) cm Tebal 1 bata Camp. 1SP: 2PP 223,928.93
39,590.50
41,400.00 24,840.00
57,850.00 11,570.00
66,100.00 1,322.00
61,950.00 1,858.50
163,981.25
650.00 91,000.00
1,337.50 58,181.25
185,000.00 14,800.00
203,571.75
10% 20,357.18
223,928.93
191,496.13
10% 19,149.61
210,645.74
CK Boyolali
HARGA JUMLAH
N PEKERJAAN BAHAN/UPAH
Rp Rp
ASANGAN DINDING
650.00 91,000.00
1,337.50 35,510.63
185,000.00 17,205.00
183,306.13
10% 18,330.61
201,636.74
179,153.00
10% 17,915.30
197,068.30
CK Boyolali
HARGA JUMLAH
N PEKERJAAN BAHAN/UPAH
Rp Rp
ASANGAN DINDING
138,313.75
650.00 91,000.00
1,337.50 24,743.75
185,000.00 22,570.00
177,904.25
10% 17,790.43
195,694.68
166,630.00
10% 16,663.00
183,293.00
rah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 2PP 107,437.96
19,795.25
41,400.00 12,420.00
57,850.00 5,785.00
66,100.00 661.00
61,950.00 929.25
77,875.63
650.00 45,500.00
1,337.50 25,345.63
185,000.00 7,030.00
97,670.88
CK Boyolali
HARGA JUMLAH
N PEKERJAAN BAHAN/UPAH
Rp Rp
ASANGAN DINDING
10% 9,767.09
107,437.96
rah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 3PP 101,106.64
19,795.25
41,400.00 12,420.00
57,850.00 5,785.00
66,100.00 661.00
61,950.00 929.25
72,119.88
650.00 45,500.00
1,337.50 19,219.88
185,000.00 7,400.00
91,915.13
10% 9,191.51
101,106.64
rah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 4PP 97,494.65
19,795.25
41,400.00 12,420.00
57,850.00 5,785.00
66,100.00 661.00
61,950.00 929.25
68,836.25
650.00 45,500.00
1,337.50 15,381.25
185,000.00 7,955.00
88,631.50
10% 8,863.15
97,494.65
CK Boyolali
HARGA JUMLAH
N PEKERJAAN BAHAN/UPAH
Rp Rp
ASANGAN DINDING
rah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 5PP 95,223.98
19,795.25
41,400.00 12,420.00
57,850.00 5,785.00
66,100.00 661.00
61,950.00 929.25
66,772.00
650.00 45,500.00
1,337.50 12,947.00
185,000.00 8,325.00
86,567.25
10% 8,656.73
95,223.98
rah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 6PP 94,037.08
19,795.25
41,400.00 12,420.00
57,850.00 5,785.00
66,100.00 661.00
61,950.00 929.25
65,693.00
650.00 45,500.00
1,337.50 11,128.00
185,000.00 9,065.00
85,488.25
10% 8,548.83
94,037.08
rah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 8PP 91,562.90
19,795.25
41,400.00 12,420.00
57,850.00 5,785.00
66,100.00 661.00
61,950.00 929.25
63,443.75
CK Boyolali
HARGA JUMLAH
N PEKERJAAN BAHAN/UPAH
Rp Rp
ASANGAN DINDING
650.00 45,500.00
1,337.50 8,693.75
185,000.00 9,250.00
83,239.00
10% 8,323.90
91,562.90
rah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 3KP 91,887.40
19,795.25
41,400.00 12,420.00
57,850.00 5,785.00
66,100.00 661.00
61,950.00 929.25
63,738.75
650.00 45,500.00
1,337.50 6,018.75
185,000.00 9,250.00
198,000.00 2,970.00
83,534.00
10% 8,353.40
91,887.40
140,211.75
CK Boyolali
HARGA JUMLAH
N PEKERJAAN BAHAN/UPAH
Rp Rp
ASANGAN DINDING
10% 14,021.18
154,232.93
140,599.13
10% 14,059.91
154,659.04
220,982.75
10% 22,098.28
243,081.03
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
1 Pp Tebal 15 mm 51,386.34
23,018.25
41,400.00 12,420.00
57,850.00 8,677.50
66,100.00 991.50
61,950.00 929.25
23,696.60
1,337.50 20,736.60
185,000.00 2,960.00
46,714.85
10% 4,671.49
51,386.34
2 Pp Tebal 15 mm 44,432.14
23,018.25
41,400.00 12,420.00
57,850.00 8,677.50
66,100.00 991.50
61,950.00 929.25
17,374.60
1,337.50 13,674.60
185,000.00 3,700.00
40,392.85
10% 4,039.29
44,432.14
3 Pp Tebal 15 mm 41,441.02
23,018.25
41,400.00 12,420.00
57,850.00 8,677.50
66,100.00 991.50
61,950.00 929.25
14,655.40
1,337.50 10,400.40
185,000.00 4,255.00
37,673.65
10% 3,767.37
41,441.02
4 Pp Tebal 15 mm 39,384.68
23,018.25
41,400.00 12,420.00
57,850.00 8,677.50
66,100.00 991.50
61,950.00 929.25
12,786.00
1,337.50 8,346.00
185,000.00 4,440.00
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
35,804.25
10% 3,580.43
39,384.68
5 Pp Tebal 15 mm 38,238.04
23,018.25
41,400.00 12,420.00
57,850.00 8,677.50
66,100.00 991.50
61,950.00 929.25
11,743.60
1,337.50 6,933.60
185,000.00 4,810.00
34,761.85
10% 3,476.19
38,238.04
6 Pp Tebal 15 mm 37,311.62
23,018.25
41,400.00 12,420.00
57,850.00 8,677.50
66,100.00 991.50
61,950.00 929.25
10,901.40
1,337.50 5,906.40
185,000.00 4,995.00
33,919.65
10% 3,391.97
37,311.62
7 Pp Tebal 15 mm 36,808.92
23,018.25
41,400.00 12,420.00
57,850.00 8,677.50
66,100.00 991.50
61,950.00 929.25
10,444.40
1,337.50 5,264.40
185,000.00 5,180.00
33,462.65
10% 3,346.27
36,808.92
8 Pp Tebal 15 mm 36,306.22
23,018.25
41,400.00 12,420.00
57,850.00 8,677.50
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
66,100.00 991.50
61,950.00 929.25
9,987.40
1,337.50 4,622.40
185,000.00 5,365.00
33,005.65
10% 3,300.57
36,306.22
34,457.30
10% 3,445.73
37,903.03
2 Kp : 8 Pp Tebal 15 mm 35,702.48
23,754.30
41,400.00 14,904.00
57,850.00 6,942.00
66,100.00 793.20
61,950.00 1,115.10
8,702.50
1,337.50 4,012.50
198,000.00 990.00
185,000.00 3,700.00
32,456.80
10% 3,245.68
35,702.48
2 Pp Tebal 20 mm 59,446.97
30,814.90
41,400.00 16,560.00
57,850.00 11,570.00
66,100.00 1,322.00
61,950.00 1,362.90
23,227.80
1,337.50 18,232.80
185,000.00 4,995.00
54,042.70
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
10% 5,404.27
59,446.97
50,417.10
10% 5,041.71
55,458.81
4 Pp Tebal 20 mm 52,649.19
30,814.90
41,400.00 16,560.00
57,850.00 11,570.00
66,100.00 1,322.00
61,950.00 1,362.90
17,048.00
1,337.50 11,128.00
185,000.00 5,920.00
47,862.90
10% 4,786.29
52,649.19
46,534.70
10% 4,653.47
51,188.17
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
14,535.20
1,337.50 7,875.20
185,000.00 6,660.00
45,350.10
10% 4,535.01
49,885.11
25,648.43
11,573.15
41,400.00 6,210.00
57,850.00 4,338.75
66,100.00 528.80
61,950.00 495.60
11,743.60
1,337.50 6,933.60
185,000.00 4,810.00
23,316.75
10% 2,331.68
25,648.43
32,417.55
10% 3,241.76
35,659.31
29,351.58
19,795.25
41,400.00 12,420.00
57,850.00 5,785.00
66,100.00 661.00
61,950.00 929.25
6,888.00
1,337.50 5,778.00
185,000.00 1,110.00
26,683.25
10% 2,668.33
29,351.58
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
11,573.15
41,400.00 6,210.00
57,850.00 4,338.75
66,100.00 528.80
61,950.00 495.60
4,156.95
1,337.50 4,156.95
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
15,730.10
10% 1,573.01
17,303.11
7,574.95
10% 757.50
8,332.45
33,718.00
10% 3,371.80
37,089.80
21,661.61
15,345.50
41,400.00 8,280.00
57,850.00 5,785.00
66,100.00 661.00
61,950.00 619.50
4,346.88
1,337.50 4,346.88
19,692.38
10% 1,969.24
21,661.61
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
14 A.4.4.3.63b 1 m' Pemasangan Plint Kayu Jati kelas III (lebar 10 cm tebal 2 c
Tenaga
L.01 0.12 OH Pekerja
L.02 0.12 OH Tukang Batu
L.03 0.012 OH Kepala Tukang
L.04 0.006 OH Mandor
Bahan
0.003 m3 Papan Kayu jati Klas III
0.05 kg Paku Sekrup 5 cm
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
Upah
0.25 Oh Pekerja
0.125 Oh Tukang batu
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
Bahan
3.1 bh Ubin granit 60x60 cm
9.8 kg Portland Cement
0.045 m³ Pasir pasang
1.3 kg Semen warna
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
PENUTUP LANTAI dan DINDING
139,260.93
53,709.25
41,400.00 28,980.00
57,850.00 20,247.50
66,100.00 2,313.50
61,950.00 2,168.25
72,891.59
4,090.91 48,559.09
1,337.50 13,375.00
185,000.00 8,325.00
1,755.00 2,632.50
126,600.84
10% 12,660.08
139,260.93
144,189.93
53,709.25
41,400.00 28,980.00
57,850.00 20,247.50
66,100.00 2,313.50
61,950.00 2,168.25
77,372.50
8,000.00 53,040.00
1,337.50 13,375.00
185,000.00 8,325.00
1,755.00 2,632.50
131,081.75
10% 13,108.18
144,189.93
143,236.75
10% 14,323.68
157,560.43
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
PENUTUP LANTAI dan DINDING
57,850.00 20,247.50
66,100.00 2,313.50
61,950.00 2,168.25
90,632.50
10,000.00 66,300.00
1,337.50 13,375.00
185,000.00 8,325.00
1,755.00 2,632.50
144,341.75
10% 14,434.18
158,775.93
135,754.69
53,709.25
41,400.00 28,980.00
57,850.00 20,247.50
66,100.00 2,313.50
61,950.00 2,168.25
69,704.10
1,684.00 44,626.00
1,337.50 13,910.00
1,755.00 2,843.10
185,000.00 8,325.00
123,413.35
10% 12,341.34
135,754.69
67,534.25
43,371.15
41,400.00 37,260.00
57,850.00 5,206.50
66,100.00 594.90
61,950.00 309.75
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
PENUTUP LANTAI dan DINDING
18,023.63
3,000.00 15,900.00
1,337.50 1,524.75
185,000.00 555.00
1,755.00 43.88
61,394.78
10% 6,139.48
67,534.25
72,197.22
43,371.15
41,400.00 37,260.00
57,850.00 5,206.50
66,100.00 594.90
61,950.00 309.75
22,262.69
4,000.00 21,200.00
1,337.50 762.38
185,000.00 277.50
1,755.00 22.82
65,633.84
10% 6,563.38
72,197.22
153,503.63
18,553.75
41,400.00 7,038.00
57,850.00 9,834.50
66,100.00 1,123.70
61,950.00 557.55
120,995.00
110,000.00 115,500.00
15,700.00 5,495.00
139,548.75
10% 13,954.88
153,503.63
149,054.62
69,054.75
41,400.00 37,260.00
57,850.00 26,032.50
66,100.00 2,974.50
61,950.00 2,787.75
66,449.45
44,600.00 47,276.00
1,337.50 12,438.75
185,000.00 3,330.00
1,755.00 3,404.70
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
PENUTUP LANTAI dan DINDING
135,504.20
10% 13,550.42
149,054.62
149,054.62
69,054.75
41,400.00 37,260.00
57,850.00 26,032.50
66,100.00 2,974.50
61,950.00 2,787.75
66,449.45
m2 44,600.00 47,276.00
Kg 1,337.50 12,438.75
m3 185,000.00 3,330.00
Kg 1,755.00 3,404.70
135,504.20
10% 13,550.42
149,054.62
203,400.86
53,709.25
41,400.00 28,980.00
57,850.00 20,247.50
66,100.00 2,313.50
61,950.00 2,168.25
131,200.63
99,100.00 109,010.00
1,337.50 15,715.63
185,000.00 6,475.00
184,909.88
10% 18,490.99
203,400.86
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
PENUTUP LANTAI dan DINDING
264,989.86
53,709.25
41,400.00 28,980.00
57,850.00 20,247.50
66,100.00 2,313.50
61,950.00 2,168.25
187,190.63
150,000.00 165,000.00
1,337.50 15,715.63
185,000.00 6,475.00
240,899.88
10% 24,089.99
264,989.86
289,189.86
53,709.25
41,400.00 28,980.00
57,850.00 20,247.50
66,100.00 2,313.50
61,950.00 2,168.25
209,190.63
170,000.00 187,000.00
1,337.50 15,715.63
185,000.00 6,475.00
262,899.88
10% 26,289.99
289,189.86
51,467.30
10% 5,146.73
56,614.03
69,015.98
22,526.80
41,400.00 9,936.00
57,850.00 4,628.00
66,100.00 528.80
61,950.00 7,434.00
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
PENUTUP LANTAI dan DINDING
40,215.00
37,100.00 38,955.00
105,000.00 1,260.00
62,741.80
10% 6,274.18
69,015.98
83,337.98
22,526.80
41,400.00 9,936.00
57,850.00 4,628.00
66,100.00 528.80
61,950.00 7,434.00
53,235.00
49,500.00 51,975.00
105,000.00 1,260.00
75,761.80
10% 7,576.18
83,337.98
95,465.48
22,526.80
41,400.00 9,936.00
57,850.00 4,628.00
66,100.00 528.80
61,950.00 7,434.00
64,260.00
60,000.00 63,000.00
105,000.00 1,260.00
86,786.80
10% 8,678.68
95,465.48
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
PENUTUP LANTAI dan DINDING
124,917.98
22,526.80
41,400.00 9,936.00
57,850.00 4,628.00
66,100.00 528.80
61,950.00 7,434.00
91,035.00
85,500.00 89,775.00
105,000.00 1,260.00
113,561.80
10% 11,356.18
124,917.98
101,240.48
22,526.80
41,400.00 9,936.00
57,850.00 4,628.00
66,100.00 528.80
61,950.00 7,434.00
69,510.00
65,000.00 68,250.00
105,000.00 1,260.00
92,036.80
10% 9,203.68
101,240.48
130,692.98
22,526.80
41,400.00 9,936.00
57,850.00 4,628.00
66,100.00 528.80
61,950.00 7,434.00
96,285.00
90,500.00 95,025.00
105,000.00 1,260.00
118,811.80
10% 11,881.18
130,692.98
19,245.90
@ 41,400.00 10,350.00
@ 57,850.00 7,231.25
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
PENUTUP LANTAI dan DINDING
@ 66,100.00 859.30
@ 61,950.00 805.35
288,107.50
@ 88,709.68 275,000.00
@ 1,337.50 13,107.50
@ 185,000.00 8,325.00
@ 1,755.00 2,281.50
307,353.40
10% 30,735.34
338,088.74
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
HARGA JUMLAH
URAIAN PEKERJAAN BAHAN/UPAH
Rp Rp
25,459.00
10% 2,545.90
Satuan Pekerjaan (D+E) 28,004.90
35,275.75
10% 3,527.58
Satuan Pekerjaan (D+E) 38,803.33
31,525.75
10% 3,152.58
Satuan Pekerjaan (D+E) 34,678.33
CK Boyolali
HARGA JUMLAH
URAIAN PEKERJAAN BAHAN/UPAH
Rp Rp
309,263.50
10% 30,926.35
Satuan Pekerjaan (D+E) 340,189.85
278,023.00
10% 27,802.30
Satuan Pekerjaan (D+E) 305,825.30
245,086.00
10% 24,508.60
Satuan Pekerjaan (D+E) 269,594.60
CK Boyolali
HARGA JUMLAH
URAIAN PEKERJAAN BAHAN/UPAH
Rp Rp
204,014.50
10% 20,401.45
Satuan Pekerjaan (D+E) 224,415.95
177,586.00
10% 17,758.60
Satuan Pekerjaan (D+E) 195,344.60
31,708.75
10% 3,170.88
Satuan Pekerjaan (D+E) 34,879.63
CK Boyolali
HARGA JUMLAH
URAIAN PEKERJAAN BAHAN/UPAH
Rp Rp
12,753.85
10% 1,275.39
Satuan Pekerjaan (D+E) 14,029.24
CK Boyolali
jati papan kelas II
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
PENUTUP ATAP
62,532.36
11,847.60
41,400.00 6,210.00
61,950.00 4,646.25
66,100.00 495.75
61,950.00 495.60
45,000.00
2,500.00 45,000.00
56,847.60
10% 5,684.76
62,532.36
50,847.60
10% 5,084.76
55,932.36
46,833.05
15,755.50
41,400.00 8,280.00
61,950.00 6,195.00
66,100.00 661.00
61,950.00 619.50
26,820.00
2,400.00 26,400.00
14,000.00 420.00
42,575.50
10% 4,257.55
46,833.05
83,067.49
30,395.90
41,400.00 16,560.00
61,950.00 12,390.00
66,100.00 1,322.00
61,950.00 123.90
45,120.00
5,700.00 28,500.00
1,337.50 10,700.00
185,000.00 5,920.00
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
PENUTUP ATAP
75,515.90
10% 7,551.59
83,067.49
75,515.90
10% 7,551.59
83,067.49
76,698.60
31,511.00
41,400.00 16,560.00
61,950.00 12,390.00
66,100.00 1,322.00
61,950.00 1,239.00
38,215.00
4,900.00 17,150.00
14,000.00 700.00
1,337.50 14,445.00
185,000.00 5,920.00
69,726.00
10% 6,972.60
76,698.60
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
PENUTUP ATAP
77,234.63
9,453.30
41,400.00 4,968.00
61,950.00 3,717.00
66,100.00 396.60
61,950.00 371.70
60,760.00
50,400.00 60,480.00
14,000.00 280.00
70,213.30
10% 7,021.33
77,234.63
27,984.99
11,380.90
41,400.00 6,210.00
61,950.00 4,336.50
66,100.00 462.70
61,950.00 371.70
14,060.00
45,000.00 13,500.00
14,000.00 560.00
25,440.90
10% 2,544.09
27,984.99
52,326.65
10% 5,232.67
57,559.32
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
PENUTUP ATAP
15,500.00 1,860.00
47,508.85
10% 4,750.89
52,259.74
39,488.85
10% 3,948.89
43,437.74
39,408.85
10% 3,940.89
43,349.74
CK Boyolali
3/25/2014
5/13/2014
11/9/2014
59,090.90
52,454.54
CK Boyolali
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
17,778,785.00
0.10 1,777,878.50
19,556,663.50
15,279,665.00
0.10 1,527,966.50
16,807,631.50
12,694,265.00
0.10 1,269,426.50
13,963,691.50
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
8,814,920.00
7,318,100.00 8,781,720.00
14,000.00 17,500.00
15,700.00 15,700.00
10,315,985.00
0.10 1,031,598.50
11,347,583.50
8,254,265.00
0.10 825,426.50
9,079,691.50
671,433.10
0.10 67,143.31
738,576.41
588,125.10
0.10 58,812.51
646,937.61
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
500,293.10
0.10 50,029.31
550,322.41
390,769.10
0.10 39,076.91
429,846.01
320,293.10
0.10 32,029.31
352,322.41
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
15,700.00 7,850.00
841,167.50
0.10 84,116.75
925,284.25
757,859.50
0.10 75,785.95
833,645.45
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
670,027.50
0.10 67,002.75
737,030.25
560,503.50
0.10 56,050.35
616,553.85
490,027.50
0.10 49,002.75
539,030.25
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
554,736.00
0.10 55,473.60
610,209.60
504,751.20
0.10 50,475.12
555,226.32
452,052.00
0.10 45,205.20
497,257.20
386,337.60
0.10 38,633.76
424,971.36
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
66,100.00 15,864.00
61,950.00 2,478.00
143,910.00
5,800,000.00 139,200.00
15,700.00 4,710.00
344,052.00
0.10 34,405.20
378,457.20
1,191,051.50
0.10 119,105.15
1,310,156.65
1,057,758.70
0.10 105,775.87
1,163,534.57
917,227.50
0.10 91,722.75
1,008,950.25
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
741,989.10
0.10 74,198.91
816,188.01
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
379,050.00
5,800,000.00 371,200.00
15,700.00 7,850.00
629,227.50
0.10 62,922.75
692,150.25
Pintu kayu lapis (Plywood) Rangkap rangka Kayu Jati Klas I 660,722.43
175,124.25
41,400.00 28,980.00
61,950.00 130,095.00
66,100.00 13,881.00
61,950.00 2,168.25
425,532.50
14,578,500.00 364,462.50
14,000.00 420.00
15,700.00 7,850.00
52,800.00 52,800.00
600,656.75
0.10 60,065.68
660,722.43 660,722.43
Pintu kayu lapis (Plywood) Rangkap rangka Kayu Jati Klas II 603,448.18
175,124.25
41,400.00 28,980.00
61,950.00 130,095.00
66,100.00 13,881.00
61,950.00 2,168.25
373,465.00
12,495,800.00 312,395.00
14,000.00 420.00
15,700.00 7,850.00
52,800.00 52,800.00
548,589.25
0.10 54,858.93
603,448.18
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
493,694.25
0.10 49,369.43
543,063.68
425,241.75
0.10 42,524.18
467,765.93
381,194.25
0.10 38,119.43
419,313.68
634,421.60
0.10 63,442.16
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
697,863.76
Pintu Plywood rangkap, rangka expose kayu Jati kelas III 639,214.93
200,142.00
41,400.00 33,120.00
61,950.00 148,680.00
66,100.00 15,864.00
61,950.00 2,478.00
380,962.48
12,495,800.00 319,892.48
14,000.00 420.00
15,700.00 7,850.00
52,800.00 52,800.00
581,104.48
0.10 58,110.45
639,214.93
524,892.00
0.10 52,489.20
577,381.20
454,796.64
0.10 45,479.66
500,276.30
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
200,142.00
41,400.00 33,120.00
61,950.00 148,680.00
66,100.00 15,864.00
61,950.00 2,478.00
209,550.00
5,800,000.00 148,480.00
14,000.00 420.00
15,700.00 7,850.00
52,800.00 52,800.00
409,692.00
0.10 40,969.20
450,661.20
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
876,810.00
14,578,500.00 874,710.00
14,000.00 2,100.00
1,062,421.25
0.10 106,242.13
1,168,663.38
937,459.25
0.10 93,745.93
1,031,205.18
805,711.25
0.10 80,571.13
886,282.38
641,425.25
0.10 64,142.53
705,567.78
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
185,611.25
41,400.00 27,738.00
61,950.00 123,900.00
66,100.00 13,220.00
61,950.00 20,753.25
350,100.00
5,800,000.00 348,000.00
14,000.00 2,100.00
535,711.25
0.10 53,571.13
589,282.38
622,534.50
0.10 62,253.45
684,787.95
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
370,325.00
12,495,800.00 312,395.00
14,000.00 420.00
15,700.00 4,710.00
52,800.00 52,800.00
570,467.00
0.10 57,046.70
627,513.70
515,572.00
0.10 51,557.20
567,129.20
447,119.50
0.10 44,711.95
491,831.45
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
15,700.00 4,710.00
52,800.00 52,800.00
403,072.00
0.10 40,307.20
443,379.20
505,009.35
0.10 50,500.94
555,510.29
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
16,031,420.00
0.10 1,603,142.00
17,634,562.00
13,740,560.00
0.10 1,374,056.00
15,114,616.00
11,370,610.00
0.10 1,137,061.00
12,507,671.00
9,190,520.00
0.10 919,052.00
10,109,572.00
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
1,000,710.00
41,400.00 165,600.00
61,950.00 743,400.00
66,100.00 79,320.00
61,950.00 12,390.00
6,299,900.00
5,600,000.00 6,160,000.00
4,100.00 61,500.00
14,000.00 78,400.00
7,300,610.00
0.10 730,061.00
8,030,671.00
18,060,609.25
0.10 1,806,060.93
19,866,670.18
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
13,885,300.00
11,454,500.00 13,745,400.00
4,100.00 61,500.00
14,000.00 78,400.00
15,561,489.25
0.10 1,556,148.93
17,117,638.18
12,976,089.25
0.10 1,297,608.93
14,273,698.18
10,597,809.25
0.10 1,059,780.93
11,657,590.18
8,536,089.25
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
0.10 853,608.93
9,389,698.18
15,594,736.00 15,594,736.00
0.10 1,559,473.60 1,559,473.60
17,154,209.60 17,154,209.60
13,303,876.00
0.10 1,330,387.60
14,634,263.60
10,933,926.00
0.10 1,093,392.60
12,027,318.60
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
61,950.00 446,040.00
66,100.00 47,592.00
61,950.00 7,434.00
8,153,410.00
7,318,100.00 8,049,910.00
4,100.00 61,500.00
14,000.00 42,000.00
8,753,836.00
0.10 875,383.60
9,629,219.60
6,863,926.00
0.10 686,392.60
7,550,318.60
235,689.43
0.10 23,568.94
259,258.37
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
14,000.00 3,500.00
206,533.03
0.10 20,653.30
227,186.33
152,623.67
0.10 15,262.37
167,886.04
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
143,604.31
0.10 14,360.43
157,964.74
110,565.75
0.10 11,056.58
121,622.33
267,053.71
0.10 26,705.37
293,759.08
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
226,591.56
11,454,500.00 160,363.00
8,712,300.00 62,728.56
14,000.00 3,500.00
237,897.31
0.10 23,789.73
261,687.04
171,441.59
0.10 17,144.16
188,585.75
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
169,949.47
0.10 16,994.95
186,944.42
130,725.75
0.10 13,072.58
143,798.33
242,695.59
0.10 24,269.56
266,965.15
210,623.55
0.10 21,062.36
231,685.91
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
61,950.00 18,585.00
66,100.00 1,983.00
61,950.00 4,646.25
146,020.00
9,300,000.00 143,220.00
14,000.00 2,800.00
177,444.25
0.10 17,744.43
195,188.68
146,922.99
0.10 14,692.30
161,615.29
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
120,464.25
0.10 12,046.43
132,510.68
97,364.25
0.10 9,736.43
107,100.68
253,622.23
0.10 25,362.22
278,984.45
219,675.85
0.10 21,967.59
241,643.44
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
66,100.00 1,983.00
61,950.00 619.50
155,090.00
9,300,000.00 151,590.00
14,000.00 3,500.00
184,557.50
0.10 18,455.75
203,013.25
152,252.53
0.10 15,225.25
167,477.78
124,247.50
0.10 12,424.75
136,672.25
99,797.50
0.10 9,979.75
109,777.25
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
177,009.55
0.10 17,700.96
194,710.51
154,516.39
0.10 15,451.64
169,968.03
130,801.75
0.10 13,080.18
143,881.93
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
14,000.00 1,400.00
101,230.27
0.10 10,123.03
111,353.30
82,201.75
0.10 8,220.18
90,421.93
179,225.25
0.10 17,922.53
197,147.78
156,315.55
0.10 15,631.56
171,947.11
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
61,950.00 12,390.00
66,100.00 1,322.00
61,950.00 309.75
114,000.00
10,300,000.00 113,300.00
14,000.00 700.00
132,161.75
0.10 13,216.18
145,377.93
102,042.65
0.10 10,204.27
112,246.92
82,661.75
0.10 8,266.18
90,927.93
418,696.40
0.10 41,869.64
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
460,566.04
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
322,826.00
11,454,500.00 320,726.00
14,000.00 2,100.00
360,383.60
0.10 36,038.36
396,421.96
300,057.60
0.10 30,005.76
330,063.36
244,564.40
0.10 24,456.44
269,020.84
196,457.60
0.10 19,645.76
216,103.36
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
37,557.60
41,400.00 6,210.00
61,950.00 27,877.50
66,100.00 2,974.50
61,950.00 495.60
458,730.80
13,537,100.00 379,038.80
14,000.00 2,100.00
80,000.00 68,800.00
15,700.00 8,792.00
496,288.40
0.10 49,628.84
545,917.24
437,975.60
0.10 43,797.56
481,773.16
377,649.60
0.10 37,764.96
415,414.56
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
66,100.00 2,974.50
61,950.00 495.60
284,598.80
7,318,100.00 204,906.80
14,000.00 2,100.00
80,000.00 68,800.00
15,700.00 8,792.00
322,156.40
0.10 32,215.64
354,372.04
274,049.60
0.10 27,404.96
301,454.56
501,314.30
0.10 50,131.43
551,445.73
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
11,454,500.00 320,726.00
14,000.00 2,100.00
80,000.00 68,800.00
15,700.00 8,792.00
443,001.50
0.10 44,300.15
487,301.65
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
382,675.50
0.10 38,267.55
420,943.05
327,182.30
0.10 32,718.23
359,900.53
279,075.50
0.10 27,907.55
306,983.05
256,271.00
0.10 25,627.10
281,898.10
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
241,692.10
0.10 24,169.21
265,861.31
226,321.50
0.10 22,632.15
248,953.65
207,154.80
0.10 20,715.48
227,870.28
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
61,950.00 1,858.50
44,715.00
5,800,000.00 40,600.00
14,000.00 1,400.00
18,100.00 2,715.00
194,821.50
0.10 19,482.15
214,303.65
32,092.00
0.10 3,209.20
35,301.20
143,932.15
0.10 14,393.22
158,325.37
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
119,265.55
0.10 11,926.56
131,192.11
102,465.55
0.10 10,246.56
112,712.11
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
191,841.45
0.10 19,184.15
211,025.60
166,850.25
0.10 16,685.03
183,535.28
140,996.25
0.10 14,099.63
155,095.88
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
117,213.45
0.10 11,721.35
128,934.80
96,596.25
0.10 9,659.63
106,255.88
78,596.25
0.10 7,859.63
86,455.88
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
29,304.50
8,577.95
41,400.00 2,070.00
57,850.00 5,785.00
66,100.00 661.00
61,950.00 61.95
18,062.50
16,250.00 17,062.50
250.00 1,000.00
26,640.45
10% 2,664.05
29,304.50
36,523.25
8,577.95
41,400.00 2,070.00
57,850.00 5,785.00
66,100.00 661.00
61,950.00 61.95
24,625.00
22,500.00 23,625.00
250.00 1,000.00
33,202.95
10% 3,320.30
36,523.25
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
4,100.00 61,500.00
14,000.00 11,200.00
15,964,220.00
0.10 1,596,422.00
17,560,642.00
13,673,360.00
0.10 1,367,336.00
15,040,696.00
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
66,100.00 79,320.00
61,950.00 12,390.00
10,302,700.00
9,300,000.00 10,230,000.00
4,100.00 61,500.00
14,000.00 11,200.00
11,303,410.00
0.10 1,130,341.00
12,433,751.00
9,123,320.00
0.10 912,332.00
10,035,652.00
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
7,233,410.00
0.10 723,341.00
7,956,751.00
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
KUNCI dan KACA
180,135.73
32,359.75
41,400.00 414.00
61,950.00 30,975.00
66,100.00 661.00
61,950.00 309.75
131,400.00
131,400.00 131,400.00
163,759.75
10% 16,375.98
180,135.73
89,284.11
31,667.38
41,400.00 207.00
61,950.00 30,975.00
66,100.00 330.50
61,950.00 154.88
49,500.00
49,500.00 49,500.00
81,167.38
10% 8,116.74
89,284.11
179,374.11
31,667.38
41,400.00 207.00
61,950.00 30,975.00
66,100.00 330.50
61,950.00 154.88
131,400.00
131,400.00 131,400.00
163,067.38
10% 16,306.74
179,374.11
21,526.59
11,369.63
41,400.00 621.00
61,950.00 9,292.50
66,100.00 991.50
61,950.00 464.63
8,200.00
8,200.00 8,200.00
19,569.63
10% 1,956.96
21,526.59
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
KUNCI dan KACA
17,051.07
7,300.98
41,400.00 414.00
61,950.00 6,195.00
66,100.00 661.00
61,950.00 30.98
8,200.00
8,200.00 8,200.00
15,500.98
10% 1,550.10
17,051.07
15,180.66
11,400.60
41,400.00 621.00
61,950.00 9,292.50
66,100.00 991.50
61,950.00 495.60
2,400.00
2,400.00 2,400.00
13,800.60
10% 1,380.06
15,180.66
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
KUNCI dan KACA
64,101.95
10% 6,410.20
70,512.15
187,772.15
14,601.95
41,400.00 828.00
61,950.00 12,390.00
66,100.00 1,322.00
61,950.00 61.95
156,100.00
156,100.00 156,100.00
170,701.95
10% 17,070.20
187,772.15
25,581.09
18,255.54
41,400.00 1,035.00
61,950.00 15,487.50
66,100.00 1,652.50
61,950.00 80.54
5,000.00
5,000.00 5,000.00
23,255.54
10% 2,325.55
25,581.09
81,016.61
10,951.46
41,400.00 621.00
61,950.00 9,292.50
66,100.00 991.50
61,950.00 46.46
62,700.00
57,000.00 62,700.00
73,651.46
10% 7,365.15
81,016.61
106,426.61
10,951.46
41,400.00 621.00
61,950.00 9,292.50
66,100.00 991.50
61,950.00 46.46
85,800.00
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
KUNCI dan KACA
78,000.00 85,800.00
96,751.46
10% 9,675.15
106,426.61
119,736.61
10,951.46
41,400.00 621.00
61,950.00 9,292.50
66,100.00 991.50
61,950.00 46.46
97,900.00
89,000.00 97,900.00
108,851.46
10% 10,885.15
119,736.61
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
HARGA JUMLAH
AIAN PEKERJAAN BAHAN/UPAH
Rp Rp
EKERJAAN PENGECATAN
rokan Permukaan Cat Tembok Lama 8,531.44
6,395.85
41,400.00 6,210.00
61,950.00 185.85
1,360.00
27,200.00 1,360.00
7,755.85
10% 775.59
8,531.44
40,399.10
10% 4,039.91
44,439.01
51,472.50
10% 5,147.25
56,619.75
CK Boyolali
HARGA JUMLAH
AIAN PEKERJAAN BAHAN/UPAH
Rp Rp
EKERJAAN PENGECATAN
26,851.77
9,650.70
41,400.00 1,656.00
57,850.00 3,644.55
66,100.00 4,164.30
61,950.00 185.85
14,760.00
41,000.00 14,760.00
24,410.70
10% 2,441.07
26,851.77
CK Boyolali
HARGA JUMLAH
AIAN PEKERJAAN BAHAN/UPAH
Rp Rp
EKERJAAN PENGECATAN
43,721.32
6,370.45
41,400.00 1,656.00
57,850.00 3,471.00
66,100.00 1,057.60
61,950.00 185.85
33,376.20
42,100.00 6,315.00
42,100.00 15,661.20
5,700.00 11,400.00
39,746.65
10% 3,974.67
43,721.32
9,691.70
10% 969.17
10,660.87
27,135.30
17,123.45
41,400.00 6,624.00
57,850.00 9,256.00
66,100.00 1,057.60
61,950.00 185.85
7,545.00
42,100.00 6,315.00
13,200.00 660.00
5,700.00 570.00
24,668.45
10% 2,466.85
27,135.30
CK Boyolali
HARGA JUMLAH
AIAN PEKERJAAN BAHAN/UPAH
Rp Rp
EKERJAAN PENGECATAN
13,200.00 1,320.00
16,000.00 1,600.00
16,000.00 4,160.00
12,154.83
10% 1,215.48
13,370.31
8,852.37
10% 885.24
9,737.61
64,916.36
13,874.88
41,400.00 828.00
57,850.00 11,570.00
66,100.00 1,322.00
61,950.00 154.88
45,140.00
35,000.00 42,000.00
15,700.00 3,140.00
59,014.88
10% 5,901.49
64,916.36
15,567.08
CK Boyolali
HARGA JUMLAH
AIAN PEKERJAAN BAHAN/UPAH
Rp Rp
EKERJAAN PENGECATAN
10% 1,556.71
17,123.78
32,000.13
10% 3,200.01
35,200.14
10,957.07
7,887.38
41,400.00 2,898.00
57,850.00 4,338.75
66,100.00 495.75
61,950.00 154.88
2,073.60
13,200.00 1,320.00
62,800.00 628.00
62,800.00 125.60
9,960.98
10% 996.10
10,957.07
CK Boyolali
6.1.1
6.1.2
6.2
6.2.1
6.6.1 Bahan
0.08 Kg Dempul Jadi
0.02 Kg Minyak Cat
0.1 lbr Amplas
6.6.2 Tenaga
0.04 OH Pekerja
0.04 OH Tukang Cat
0.004 OH Kepala Tukang
0.0025 OH Mandor
6.7.2 Tenaga
0.07 OH Pekerja
0.075 OH Tukang Cat
0.0075 OH Kepala Tukang
0.0025 OH Mandor
6.8.2 Tenaga
0.07 OH Pekerja
0.009 OH Tukang Cat
0.006 OH Kepala Tukang
0.0025 OH Mandor
CK Boyolali
6.9 1 m2 Pengecatan Bidang Kayu Baru (1 lap.Plamir)
1 lap.Cat Dasar & 3 lap.Cat Penutup
6.9.1 Bahan
0.2 Kg Cat Meni
0.15 Kg Plamir
0.17 Kg Cat Dasar
0.35 Kg Cat Penutup 2 kali
6.9.2 Tenaga
0.07 OH Pekerja
0.105 OH Tukang Cat
0.004 OH Kepala Tukang
0.0025 OH Mandor
CK Boyolali
6.10
6.10.1
6.10.2
6.11
6.11.1
6.11.2
6.12
6.12.1
6.12.2
6.13
6.13.1
6.14 1
6.14.2
CK Boyolali
6.15
6.15.1
6.15.2
6.20
6.20.1
6.20.2
CK Boyolali
6.21
6.21.1
6.21.2
CK Boyolali
is Seng (Galvanis) secara
sional dg Tebal 200 μm
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
27 A.5.1.1.37 1 m1 Pas. Buis beton dia 20 cm dengan rolag bata 1 : 4 (rolag pen
A Bahan
0.063 Urugan pasir : 0.1 x 0.7 x 0.9
1.41435 Pas. Bata 1: 4 : 3.143 x 0.45 x 1
1 Pas. Buis beton Ø 20 cm : 1 buah
B Tenaga
0.63 Galian tanah : 0.7 x 0.9 x 1
0.21 Urugan kembali : 1/3 x 0.7 x 0.9 x 1
0.063 Urugan pasir : 0.1 x 0.7 x 0.9
1.41435 Pas. Bata 1: 4 : 3.143 x 0.45 x 1
1 Pas. Buis beton Ø 20 cm : 1 buah
0.42 Pembuangan tanah : 2/3 x 0.7 x 0.9 x 1
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
28 A.5.1.1.38 1 m1 Pas. Buis beton dia 30 cm dengan rolag bata 1 : 4 (rolag pen
A Bahan
0.08 Urugan pasir : 0.1 x 0.8 x 1
1.72865 Pas. Bata 1: 4 : 3.143 x 0.55 x 1
1 Pas. Buis beton Ø 30 cm : 1 buah
B Tenaga
0.8 Galian tanah : 0.8 x 1 x 1
0.266667 Urugan kembali : 1/3 x 0.8 x 1 x 1
0.08 Urugan pasir : 0.1 x 0.8 x 1
1.72865 Pas. Bata 1: 4 : 3.143 x 0.55 x 1
1 Pas. Buis beton Ø 30 cm : 1 buah
0.533333 Pembuangan tanah : 2/3 x 0.8 x 1 x 1
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
29 A.5.1.1.39 1 m1 Pas. Buis beton dia 40 cm dengan rolag bata 1 : 4 (rolag pen
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
30 A.5.1.1.40 1 m1 Pas. Buis beton dia 50 cm dengan rolag bata 1 : 4 (rolag pen
A Bahan
0.1 Urugan pasir : 0.1 x 1 x 1
2.35725 Pas. Bata 1: 4 : 3.143 x 0.75 x 1
1 Pas. Buis beton Ø 50 cm : 1 buah
B Tenaga
1.2 Galian tanah : 1 x 1.2 x 1
0.4 Urugan kembali : 1/3 x 1 x 1.2 x 1
0.1 Urugan pasir : 0.1 x 1 x 1
2.35725 Pas. Bata 1: 4 : 3.143 x 0.75 x 1
1 Pas. Buis beton Ø 50 cm : 1 buah
0.6 Pembuangan tanah : 2/3 x 0.9 x 1 x 1
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
31 A.5.1.1.41 1 m1 Pas. Buis beton dia 60 cm dengan rolag bata 1 : 4 (rolag pen
A Bahan
0.11 Urugan pasir : 0.1 x 1.1 x 1
2.67155 Pas. Bata 1: 4 : 3.143 x 0.85 x 1
1 Pas. Buis beton Ø 60 cm : 1 buah
B Tenaga
1.43 Galian tanah : 1.1 x 1.3 x 1
0.476667 Urugan kembali : 1/3 x 1.1 x 1.3 x 1
0.11 Urugan pasir : 0.1 x 1.1 x 1
2.67155 Pas. Bata 1: 4 : 3.143 x 0.85 x 1
1 Pas. Buis beton Ø 60 cm : 1 buah
0.953333 Pembuangan tanah : 2/3 x 1.1 x 1.3 x 1
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
32 A.5.1.1.42 1 m1 Pas. Buis beton dia 80 cm dengan rolag bata 1 : 4 (rolag pen
A Bahan
0.13 Urugan pasir : 0.1 x 1.3 x 1
3.30015 Pas. Bata 1: 4 : 3.143 x 1.05 x 1
2 Pas. Buis beton Ø 80 cm : 2 buah
B Tenaga
1.82 Galian tanah : 1.3 x 1.4 x 1
0.606667 Urugan kembali : 1/3 x 1.3 x 1.4 x 1
0.13 Urugan pasir : 0.1 x 1.3 x 1
3.30015 Pas. Bata 1: 4 : 3.143 x 1.05 x 1
2 Pas. Buis beton Ø 80 cm : 2 buah
1.213333 Pembuangan tanah : 2/3 x 1.3 x 1.4 x 1
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
Diperiksa,
KEPALA BIDANG CIPTA KARYA
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
SANITASI DALAM GEDUNG
1,353,486.20
210,828.00
41,400.00 136,620.00
57,850.00 63,635.00
66,100.00 661.00
61,950.00 9,912.00
1,019,614.00
961,900.00 961,900.00
961,900.00 57,714.00
1,230,442.00
10% 123,044.20
1,353,486.20
311,824.70
148,002.00
41,400.00 41,400.00
57,850.00 86,775.00
66,100.00 9,915.00
61,950.00 9,912.00
135,475.00
125,600.00 125,600.00
1,337.50 8,025.00
185,000.00 1,850.00
283,477.00
10% 28,347.70
311,824.70
1,776,931.75
108,957.50
41,400.00 41,400.00
57,850.00 57,850.00
66,100.00 6,610.00
61,950.00 3,097.50
1,506,435.00
1,151,200.00 1,151,200.00
1,151,200.00 345,360.00
1,337.50 8,025.00
185,000.00 1,850.00
1,615,392.50
10% 161,539.25
1,776,931.75
495,437.25
147,194.50
41,400.00 49,680.00
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
SANITASI DALAM GEDUNG
57,850.00 83,882.50
66,100.00 9,915.00
61,950.00 3,717.00
303,203.00
261,900.00 261,900.00
261,900.00 31,428.00
1,337.50 8,025.00
185,000.00 1,850.00
450,397.50
10% 45,039.75
495,437.25
810,604.30
443,585.00
41,400.00 124,200.00
57,850.00 260,325.00
66,100.00 3,305.00
61,950.00 55,755.00
293,328.00
261,900.00 261,900.00
261,900.00 31,428.00
736,913.00
10% 73,691.30
810,604.30
1,058,336.95
443,638.50
41,400.00 248,400.00
57,850.00 173,550.00
66,100.00 19,830.00
61,950.00 1,858.50
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
SANITASI DALAM GEDUNG
518,486.00
650.00 97,500.00
0.11 1,337.50 160,500.00
0.0121 185,000.00 55,500.00
82.6446280992 1,784.00 194,456.00
1,755.00 10,530.00
962,124.50
10% 96,212.45
1,058,336.95
79,202.59
10,741.85
41,400.00 5,796.00
57,850.00 4,049.50
66,100.00 462.70
61,950.00 433.65
61,260.50
27,250.00 29,975.00
487,500.00 13,162.50
1,337.50 5,243.00
185,000.00 10,360.00
105,000.00 2,520.00
72,002.35
10% 7,200.24
79,202.59
640,483.47
29,156.45
41,400.00 15,732.00
57,850.00 10,991.50
66,100.00 1,255.90
61,950.00 1,177.05
553,101.25
229,700.00 252,670.00
487,500.00 268,125.00
1,337.50 13,776.25
185,000.00 11,285.00
105,000.00 7,245.00
582,257.70
10% 58,225.77
640,483.47
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
SANITASI DALAM GEDUNG
57,850.00 41,652.00
66,100.00 4,759.20
61,950.00 681.45
139,320.00
650.00 26,000.00
1,337.50 58,850.00
185,000.00 12,950.00
185,000.00 11,100.00
206,000.00 14,420.00
10,000.00 16,000.00
275,836.65
10% 27,583.67
303,420.32
410,033.30
10% 41,003.33
451,036.63
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
SANITASI DALAM GEDUNG
Batu Bata 60x60 tinggi 60 cm 599,157.68
200,725.80
41,400.00 132,480.00
57,850.00 66,527.50
66,100.00 727.10
61,950.00 991.20
343,963.00
650.00 79,950.00
1,337.50 152,475.00
185,000.00 34,040.00
185,000.00 22,200.00
10,000.00 48,500.00
206,000.00 6,798.00
544,688.80
10% 54,468.88
599,157.68
35,914.62
9,709.65
41,400.00 2,235.60
57,850.00 5,206.50
66,100.00 594.90
61,950.00 1,672.65
22,940.00
14,800.00 17,760.00
14,800.00 5,180.00
32,649.65
10% 3,264.97
35,914.62
41,541.12
9,709.65
41,400.00 2,235.60
57,850.00 5,206.50
66,100.00 594.90
61,950.00 1,672.65
28,055.00
18,100.00 21,720.00
18,100.00 6,335.00
37,764.65
10% 3,776.47
41,541.12
57,056.62
9,709.65
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
SANITASI DALAM GEDUNG
41,400.00 2,235.60
57,850.00 5,206.50
66,100.00 594.90
61,950.00 1,672.65
42,160.00
27,200.00 32,640.00
27,200.00 9,520.00
51,869.65
10% 5,186.97
57,056.62
99,691.63
16,383.75
41,400.00 4,471.20
57,850.00 10,413.00
66,100.00 1,189.80
61,950.00 309.75
74,245.00
47,900.00 57,480.00
47,900.00 16,765.00
90,628.75
10% 9,062.88
99,691.63
183,226.12
20,559.20
41,400.00 5,589.00
57,850.00 13,016.25
66,100.00 1,520.30
61,950.00 433.65
146,010.00
94,200.00 113,040.00
94,200.00 32,970.00
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
SANITASI DALAM GEDUNG
166,569.20
10% 16,656.92
183,226.12
259,269.12
20,559.20
41,400.00 5,589.00
57,850.00 13,016.25
66,100.00 1,520.30
61,950.00 433.65
215,140.00
138,800.00 166,560.00
138,800.00 48,580.00
235,699.20
10% 23,569.92
259,269.12
12,338.59
5,481.90
41,400.00 1,490.40
57,850.00 3,471.00
66,100.00 396.60
61,950.00 123.90
5,735.00
3,700.00 4,440.00
3,700.00 1,295.00
11,216.90
10% 1,121.69
12,338.59
14,810.84
5,481.90
41,400.00 1,490.40
57,850.00 3,471.00
66,100.00 396.60
61,950.00 123.90
7,982.50
5,150.00 6,180.00
5,150.00 1,802.50
13,464.40
10% 1,346.44
14,810.84
18,348.72
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
SANITASI DALAM GEDUNG
5,481.90
41,400.00 1,490.40
57,850.00 3,471.00
66,100.00 396.60
61,950.00 123.90
11,198.75
7,225.00 8,670.00
7,225.00 2,528.75
16,680.65
10% 1,668.07
18,348.72
19,573.51
8,222.85
41,400.00 2,235.60
57,850.00 5,206.50
66,100.00 594.90
61,950.00 185.85
9,571.25
6,175.00 7,410.00
6,175.00 2,161.25
17,794.10
10% 1,779.41
19,573.51
29,803.51
8,222.85
41,400.00 2,235.60
57,850.00 5,206.50
66,100.00 594.90
61,950.00 185.85
18,871.25
12,175.00 14,610.00
12,175.00 4,261.25
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
SANITASI DALAM GEDUNG
27,094.10
10% 2,709.41
29,803.51
87,498.90
20,334.45
41,400.00 3,353.40
57,850.00 7,809.75
66,100.00 8,923.50
61,950.00 247.80
59,210.00
38,200.00 45,840.00
38,200.00 13,370.00
79,544.45
10% 7,954.45
87,498.90
332,210.18
21,509.25
41,400.00 1,242.00
57,850.00 17,355.00
66,100.00 1,983.00
61,950.00 929.25
280,500.00
230,500.00 230,500.00
50,000.00 50,000.00
302,009.25
10% 30,200.93
332,210.18
51,029.28
26,507.75
41,400.00 414.00
57,850.00 23,140.00
66,100.00 2,644.00
61,950.00 309.75
19,882.50
19,800.00 19,800.00
3,300.00 82.50
46,390.25
10% 4,639.03
51,029.28
11,516.73
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
SANITASI DALAM GEDUNG
7,169.75
41,400.00 414.00
57,850.00 5,785.00
66,100.00 661.00
61,950.00 309.75
3,300.00
3,300.00 3,300.00
10,469.75
10% 1,046.98
11,516.73
193,182.81
10% 19,318.28
212,501.09
246,029.47
10% 24,602.95
270,632.42
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
SANITASI DALAM GEDUNG
203,969.02
126,000.00 11,340.00
68,836.25 140,629.02
52,000.00 52,000.00
89,041.79
32,598.75 32,272.76
10,866.25 3,585.86
13,039.50 1,173.56
19,795.25 40,440.71
3,000.00 3,000.00
14,281.50 8,568.90
293,010.80
10% 29,301.08
322,311.88
356,014.45
10% 35,601.45
391,615.90
437,188.65
10% 43,718.87
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
SANITASI DALAM GEDUNG
480,907.52
560,822.52
10% 56,082.25
616,904.77
95,410.73
10% 9,541.07
104,951.80
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
SANITASI DALAM GEDUNG
126,412.04
10% 12,641.20
139,053.25
153,378.20
10% 15,337.82
168,716.02
196,249.19
10% 19,624.92
215,874.10
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
SANITASI DALAM GEDUNG
19,795.25 15,865.20
4,000.00 4,000.00
14,281.50 10,473.10
254,955.01
10% 25,495.50
280,450.51
77,875.51
10% 7,787.55
85,663.06
85,794.56
10% 8,579.46
94,374.01
Sukoharjo, 2015
Direncana
KASI BINA TEKNIS
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
SANITASI DALAM GEDUNG
AS PEKERJAAN UMUM
ATEN SUKOHARJO
AD HUFRONI, MT
CK Boyolali
0.9922
0.0121 360 4.356
0.04 109 4.36 25
108.9
CK Boyolali
233,751.20
CK Boyolali
115,446.98
CK Boyolali
280,450.51
183,469.85
12,600.00
55,169.85
115,700.00
71,485.17
35,858.63
3,984.29
1,303.95
CK Boyolali
15,865.20
4,000.00
10,473.10
254,955.01
25,495.50
280,450.51
CK Boyolali
HARGA JUMLAH
No. KOEF SAT. 0 BAHAN/UPAH
Rp Rp
HARGA SATUAN PEKERJAAN BEGESTING
1 1 m2 Memasang Bekisting untuk Pondasi 76,374.80
A Tenaga 39,898.30
0.52 OH Pekerja 41,400.00 21,528.00
0.26 OH Tukang Kayu 57,850.00 15,041.00
0.03 OH Kepala Tukang 66,100.00 1,718.60
0.03 OH Mandor 61,950.00 1,610.70
B Bahan 29,533.33
0.01 m3 Kayu Klas III 1,900,000.00 25,333.33
0.20 Kg Paku Biasa 2" - 5" 14,000.00 2,800.00
0.10 Ltr Minyak Bekisting 14,000.00 1,400.00
C PERALATAN
D Jumlah A + B + C 69,431.63
E Overhead & Profit 10% 6,943.16
F Harga Satuan Pekerjaan (D+E) 76,374.80
CK Boyolali
A Tenaga 50,640.15
0.66 OH Pekerja 41,400.00 27,324.00
0.33 OH Tukang Kayu 57,850.00 19,090.50
0.03 OH Kepala Tukang 66,100.00 2,181.30
0.03 OH Mandor 61,950.00 2,044.35
B Bahan 285,750.00
0.04 m3 Kayu Klas III 1,900,000.00 76,000.00
0.40 Kg Paku Biasa 2" - 5" 14,000.00 5,600.00
0.20 Ltr Minyak Bekisting 14,000.00 2,800.00
0.02 m3 Balok Kayu Klas II (Borneo) 5,600,000.00 84,000.00
0.35 Lbr Plywood tebal 9mm 109,000.00 38,150.00
6.00 Btg Bambu 13,200.00 79,200.00
C PERALATAN
D Jumlah A + B + C 336,390.15
E Overhead & Profit 10% 33,639.02
F Harga Satuan Pekerjaan (D+E) 370,029.17
CK Boyolali
No. KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
HARGA JUMLAH
BAHAN/UPAH
Rp Rp
Err:509
144,750.00
41,400.00 82,800.00
61,950.00 61,950.00
Err:509
72,500.00 87,000.00
Err:509 Err:509
13,200.00 13,200.00
Err:509
Err:509
Err:509
Err:509
36,187.50
41,400.00 20,700.00
61,950.00 15,487.50
Err:509
72,500.00 43,500.00
Err:509 Err:509
Err:509
Err:509
Err:509
CK Boyolali