BETON BERTULANG
PEKERJAAN : PERPANJANGAN LANDASAN PACU
LOKASI : BANDAR UDARA A. A. BERE TALO - ATAMBUA KAB. BELU
1. Data Perencanaan
b4
1.1 Dimensi
B = 4.00 m H = 6.00 m
L = 1.00 m (panjang pias )
b1 = 2.00 m
b2 = 0.80 m h1
b3 = 1.20 m
b4 = 0.60 m
h1 = 6.00 m
h2 = 1.00 m
h3 = 1.50 m h2
h3
1.2 Parameter
f m
o
= 35.00 = 0.50 (koefisien geser) Geser
Um = 1.00 (koefisien gaya angkat) normal fs > 2.00
b = 14.036 o
a
o
= 0.000 (untuk analisa stabilitas) Daya dukung pondasi
o
= 21.448 (untuk analisa struktural) normal qmax<qa
d = 14.036
o
(untuk analisa stabilitas pada kondisi normal, d = b) qa=qu/3
= 23.33
o
(untuk analisis struktur pada kondisi normal, d = 2/3 f)
F = 8.531 o
( = Arc tan(Kh) ) Kh = 0.15
2. Perhitungan Stabilitas
b4
h1
5 3
Pa1
H
h2 2 Pp1
h3 1
b1 b2 b3
B
(1) Beban vertikal
No. Uraian W X WxX
1 1.00 x 1.50 x 0.80 x 2.40 2.880 2.400 6.91
2 1.00 x 1.00 x 4.00 x 2.40 9.600 2.000 19.20
3 1.00 x 0.60 x 6.00 x 2.40 8.640 2.300 19.87
4 0.50 x 0.20 x 6.00 x 2.40 1.440 2.667 3.84
5 1.00 x 2.00 x 6.00 x 1.00 12.000 1.000 12.00
a d b
o o o
= 0.000 = 14.036 = 14.04
Cos2(f -a) = 0.671 Sin(f+d) = 0.755
Cos2a = 1.000 Sin(f -b) = 0.358
Cos(a+d) = 0.970 Cos(a-b) = 0.970
Ka = 0.293 untuk sisi depan DPT
a = 21.448 o
d = 23.333 o
b = 14.04 o
2
Cos (f -a) = 0.945 Sin(f+d) = 0.851
Cos2a = 0.866 Sin(f-b) = 0.358
Cos(a+d) = 0.710 Cos(a-b) = 0.992
Ka' = 0.559 untuk sisi belakang DPT
Kp = 3.213
a d b
o o o
= 21.448 = 23.333 = 14.04
2
Cos (f +a) = 0.305 Sin(f-d) = 0.202
Cos2a = 0.866 Sin(f+b) = 0.755
Cos(a+d) = 0.710 Cos(a-b) = 0.992
Kp' = 1.735
2 2
1.525 t/m - t/m
2 2
15.755 t/m - t/m
bila, e > 0 bila, e < 0
(dipakai) (tidak dipakai)
2.4 Daya dukung tanah
(a x c x Nc) = 0.274
(gsoil x z x Nq) = 22.750
2
qu = 49.624 t/m
2
qa = qu / 3 = 16.541 t/m (angka keamanan = 3 , konsiai normal)
3. Perhitungan Struktur
(1) Dinding
b4
h1 A A
Pa1
H
B B
h2 Pp1
h3
b1 b2 b3
Kpa = 1.735
a = 21.448 o
d = 23.33 o
a) Potongan A - A
h = 3.00 m
qa1 = Kha x h x gsoil = 2.144 ton/m
qa3 = qa1 + qa2 = #REF! ton/m
b) Potongan B - B
h = 6.00 m
qa1 = Kha x (h - hw1) x gsoil = 3.859 ton/m
b4
h1
2
C D
(2) Pondasi
b4
h1
2
C D
h2 1 3
h3
C D
b1 b2 b3
a) Potongan C - C
Dipasang tulangan 16~150 16~150 19~100 16~150 16~150 16~150 16~150 16~150
Beton As cm2 13.40 13.40 28.35 13.40 13.40 13.40 13.40 13.40
Batasan penulangan U cm 33.51 0 59.69 0 33.51 0 33.51 0
B
LB=b1 b1 b1 b2
sho
h1
h1
h1 Materil
h1 Timbunan
h1
h1
Z h1
h1
Pa
h1
h1
h1
h1 O shao
shz shpo
D
pa
pp
shpd
shad
L
I. DATA
DATA BRONJONG
Material pengisi : Batu Kali 15/20 cm
Density (BJ) : gbk = 1.44 t/m3
Beban Luar : qu = 0.00 kg/cm2
KOEFISEIN TANAH
2
Menurut Rankine , Koefisien Tanah Aktif, Ka= tan (45-f/2) = 0.406
2
Koefisien Tanah Pasif, Kp=tan (45+f/2) = 2.464
FAKTOR KEAMANAN
- Terhadap guling SFgl = 2.00
- Terhadap geser SFgs = 1.50
Page 1 of 3
II. KONTROL STABILITAS
- Terhadap Guling
Chek Momen Guling pada titik O
B= 5.00 m
b1 = 1.00 m
b2 = 2.00 m
h1 = 0.50 m
L= 5.00 m
nlayer = 12.00
- Terhadap Geser
LB = 1.00 m
D= 2.00 m
Koefisien geser m = 0.50
Pa = 11.835 ton
pa = shao x D + D/2 x (shad - shao) = 1.403 ton
Ha = Pa + pa = 13.238 ton
Page 2 of 3
Gaya Penahan
Berat bronjong diatas tanah Wp = 30.240 ton
Berat bronjong didalam tanah Wbr = L1xDxgbk = 14.400 ton
S Wp = Wp + Wbr = 44.640 ton
HR = m x S Wp = 22.320 to
Data Perencanaan
- Parameter Tanah Dasar
fB = 20.33
o
cB = 0.01 t/m2 gs' = 1.75 t/m3 (=gsat-gw)
- Dimensi Pondasi
B=L1 = 5.00 m z = 2.00 m L = 1.00 m (panjang pias)
Shape of footing a b
1 lajur 1.00 0.50
2 persegi 1.30 0.40
3 segi empat , B x L 1.13 0.40
(B < L) (= 1.09 + 0.21 B/L)
(B > L) (= 1.09 + 0.21 L/B)
4 lingkaran, diameter = B 1.30 0.30
f Nc Nq Ng
0 5.7 0.0 0.0
5 7.0 1.4 0.0
10 9.0 2.7 0.2
15 12.0 4.5 2.3
20 17.0 7.5 4.7
25 24.0 13.0 9.5
30 36.0 23.0 20.0
35 57.0 44.0 41.0
37 70.0 50.0 55.0
39 > 82.0 50.0 73.0
(a x c x Nc) = 0.269
t/m2
2
Kontrol terhadap daya dukung q = ∑Wp/B = 8.928 < qa = 14.323 t/m Aman
Page 3 of 3