NOMOR : …………………... T
TENTANG
STANDARISASI HARGA SATUAN BAHAN, UPAH DAN ANALI
BIAYA PEKERJAAN YANG TERDIRI DARI ANALISA E DAN ANA
BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN (ABK-SNI) K
TAHUN ANGGARAN 2010
HARGA
TANPA
NO TENAGA KERJA SATUAN KODE KEUNTUNGAN
(OVERHEAD)
(Rp)
A. UPAH
1 Mandor Lapangan Org/hari L.061 60,500.00
2 Mekanik Org/hari L.071 60,500.00
3 Kepala Tukang Org/hari L.073 60,500.00
4 Tukang Batu / Kayu / Gali / Besi / Cor / Semen / Cat / Listrik / Pancang Org/hari L.079 55,000.00
5 Operator terlatih Org/hari L.081 49,500.00
6 Operator semi terlatih Org/hari L.082 44,000.00
7 Sopir Org/hari L.091 49,500.00
8 Pekerja / Buruh Lapangan Tak terlatih Org/hari L.101 44,000.00
9 Pekerja / Buruh Lapangan terlatih Org/hari L.106 49,500.00
NO MATERIAL SATUAN
B. BAHAN PENGISI
1 Batu Kong M³
2 Batu Sap Pinang M³
3 Batu pecah 15-20 cm M³
4 Batu pecah 10-15 cm M³
5 Batu pecah 5-7 cm M³
6 Batu pecah 3-5 cm M³
NO MATERIAL SATUAN
49 Tiang Pancang (Mini Pile / Ready Mix) uk. Π 20 x 20, K 300 - 6m Btg
50 Tiang Pancang (Mini Pile / Ready Mix) uk. Π 25 x 25, K 300 - 6m Btg
51 Tiang Pancang (Mini Pile / Ready Mix) uk. Δ 28 x 28 x 28, K 300 - 6m Btg
52 Tiang Pancang (Mini Pile / Ready Mix) uk. Δ 32 x 32 x 32, K 300 - 6m Btg
53 Papan Turap Uk. 15/50 - 5m Kpg
54 Papan Turap Uk. 15/50 - 6m Kpg
55 Pemancangan Mini Pile - 6m Btg
56 Sewa Pompa Ready Mix (Min. 100 M³) M³
57 Bahan Plastik Cor Beton M²
NO MATERIAL SATUAN
C. BAHAN KAYU
1 Ky. Belian tdk ketam Uk. 6/6 - 4 M M³
2 Ky. Belian tdk ketam Uk. 7/7 - 4 M M³
3 Ky. Belian tdk ketam Uk. 8/8 - 4 M M³
4 Ky. Belian tdk ketam Uk. 9/9 - 4 M M³
5 Ky. Belian tdk ketam Uk. 10/10 - 4 M M³
6 Ky. Belian tdk ketam Uk. 12/12 - 4 M M³
7 Ky. Belian tdk ketam Uk. 18/18 - 4 M M³
8 Ky. Belian ketam Uk. 6/6 - 4 M M³
9 Ky. Belian ketam Uk. 7/7 - 4 M M³
10 Ky. Belian ketam Uk. 8/8 - 4 M M³
11 Ky. Belian ketam Uk. 5/10 - 4 M M³
12 Ky. Belian ketam Uk. 4/8 - 4 M M³
13 Papan belian ketam (4m) M³
14 Papan belian tdk ketam (4m) M³
15 Ky. klas I Bengkirai uk. 8/8 - 4 M ( ketam ) M³
16 Ky. klas I Bengkirai uk. 8/8 - 4 M ( tdk ketam ) M³
17 Ky. klas I Bengkirai uk. 7/7 - 4 M ( tdk ketam ) M³
18 Ky. klas I Bengkirai uk. 7/7 - 4 M ( ketam ) M³
19 Ky. klas I Bengkirai uk. 5/10 - 4 M ( ketam / untuk kusen ) M³
20 Kusen Ky Kelas I Bangkirai uk. 5/10 M³
21 Ky. klas II Mabang uk. 8/8 - 4 M ( tdk ketam ) M³
22 Ky. klas II Mabang uk. 8/8 - 4 M ( ketam ) M³
23 Ky. klas II Mabang uk. 7/7 - 4 M ( tdk ketam ) M³
24 Ky. klas II Mabang uk. 7/7 - 4 M ( ketam ) M³
25 Ky. klas II Mabang uk. 4/6 - 4 M ( tdk ketam ) M³
26 Ky. klas II Mabang uk. 5/7 - 4 M ( tdk ketam ) M³
27 Ky. klas II Mabang uk. 5/10 - 4 M ( tdk ketam ) M³
28 Ky. klas II Mabang uk. 6/10 - 4 M ( tdk ketam ) M³
29 Ky. klas II Mabang uk. 6/12 - 4 M ( tdk ketam ) M³
30 Ky. klas II Mabang uk. 4/8 - 4 M ( tdk ketam ) M³
31 Ky. klas II Mabang uk. 8/15 - 4 M ( tdk ketam ) M³
32 Ky. klas II Mabang uk. 8/12 - 4 M ( tdk ketam ) M³
33 Ky klas III uk. 3/5 - 4 M ( tdk ketam) M³
34 Ky klas III uk. 4/6 - 4 M ( tdk ketam) M³
35 Papan kayu klas II (mabang) tdk ketam M³
36 Papan kayu klas II (mabang) ketam M³
37 Papan kayu klas I tdk ketam M³
38 Papan kayu klas I ketam M³
39 Papan mal klas III M³
40 Papan Simpiran M³
NO MATERIAL SATUAN
D. BAHAN CAT
1 Amplas Lbr
2 Minyak cat Kg
3 Cat kilat Kg
4 Plamur Kg
5 Cat dasar Kg
6 Cat tembok Kg
7 Cat tembok type weather shield Kg
8 Cat tembok type weather coat (acrylic) Kg
9 Cat seng Kg
10 Dempul Kg
11 Plitur Kg
12 Thiner Ltr
13 Thiner ND Ltr
14 Melamic Ltr
15 Vernis Ltr
16 Meni Kg
17 Oker Kg
18 Lem Kayu Kg
19 Sealent Tube
20 Soda Api Kg
21 Sabun / cream pembersih kotoran Kg
22 Teak Oil Ltr
23 Ter / Residu Ltr
24 Kuas 4" Bh
25 Road Line Paint ( Cat Marka ) Ltr
26 Glass Bit Kg
27 Weatherbond Emulsion ( cat kerb ) Kg
28 Termoplast Kg
3 Kawat baja/bendrat Kg
4 Simpai roll Kg
5 Kawat simpai Kg
6 Baut dia 4/8 " pj = 20 cm Btg
7 Besi Penahan bh
8 Beugel plat L. 3 cm bh
9 Plat 1,2 x 2,4 x 12 Bh
10 Besi Konstruksi (I, H) Kg
11 Besi Konstruksi ( C ) Kg
12 Besi Konstruksi (siku ) Kg
13 Kawat Las Btg
NO MATERIAL SATUAN
14 Kawat Las Kg
15 Kawat harmonika M²
16 Kawat kasa M²
17 Pipa galvanis dia 3/4" Btg
18 Pipa galvanis dia 1/2" Btg
19 Pipa galvanis dia 1" Btg
20 Pipa galvanis dia 1 1/4" Btg
21 Pipa galvanis dia 1 1/2" Btg
22 Pipa galvanis dia 2" Btg
23 Pipa galvanis dia 3" Btg
24 Pipa galvanis dia 4" Btg
25 Folding gate M²
26 Rangka Aluminium 1 1/2" x 3" Meter
27 Rangka Aluminium 1 3/4" x 4" Meter
28 Pintu Aluminium std IKP, lengkap 4" Unit
29 Rangka Baja Ringan Zincalume (truss/color) + Pemasangan M²
30 Rangka Baja Ringan Zincalume (truss/polos) + Pemasangan M²
31 Alumatek Unit
F. BAHAN PENGANTUNG
1 Pintu Plastik untuk WC Bh
2 Kait angin Bh
3 Handle Jendela Bh
4 Handle Pintu Bh
5 Engsel jendela Bh
6 Engsel pintu Bh
7 Slot pintu Bh
8 Slot jendela Bh
9 Kunci tanam 2 slag (setaraf Belluci) Bh
10 Kunci tanam 1 slag Bh
11 Kunci tanam antik Bh
12 Kunci tanam biasa Bh
13 Kunci silinder Bh
14 Door Closer Bh
15 Door Stoper Bh
16 Paku Seng Kg
17 Paku campuran 1" - 5 " Kg
18 Paku beton Kg
19 Paku Atap Seng Kg
20 Paku triplek Kg
21 Paku GRC Kg
22 Paku Zincallume Kg
NO MATERIAL SATUAN
23 Sekrup Gypsum Kg
24 Sekrup Fixer Bh
25 Engsel Angin Bh
G. BAHAN ATAP
1 Sirap belian Lbr
2 Asbes Lbr
3 Eternit M²
4 Genteng Metal Type Prima 0.35 Lbr
5 Genteng Metal Type Royal 0.35 Lbr
6 Genteng Metal Type Classic 0.35 Lbr
7 Genteng Metal Stone ( Type Classic 0.35 ) Lbr
8 Genteng Metal Stone ( Type Prima 0.35 ) Lbr
9 Atap Metal Supersheet 0.35 (polos) M'
10 Atap Metal Supersheet 0.35 (polos) M²
11 Atap Trim Deck 0.3 (polos) M²
12 Atap Trim Deck 0.33 (color) M²
13 Nok bubungan genteng metal 1/2 lingkaran 0.35 (pj 40cm) Bh
14 Nok bubungan genteng metal stone 1/2 lingkaran 0.35 (pj 40cm) Bh
15 Nok bubungan genteng metal kotak 0.35 M'
16 Nok bubungan genteng metal stone kotak 0.35 M'
17 Nok bubungan Trim Deck (polos) M'
18 Nok bubungan Trim Deck (color) M'
19 Seng Gelombang Bjls 30 Lbr
20 Seng Gelombang Bjls 20 Lbr
21 Seng Plat Bjls 20 Lbr
22 Seng Plat Bjls 30 Lbr
23 Seng Plat Bjls 30 (lebar 45 cm) M'
24 Plat Datar Color 0.35 Lbr
25 Zincalume Gelombang Persegi 0.35 (polos) M²
26 Zincalume Gelombang Persegi 0.30 (polos) M²
27 Zincalume Gelombang Persegi 0.35 (color) M²
28 Zincalume Gelombang Persegi 0.30 (color) M²
29 Zincalume Plat 0.2 Lbr
30 Aluminium Foil M²
H. BAHAN KACA
1 Kaca Polos, t = 5 mm M²
2 Kaca Polos, t = 12mm M²
3 Kaca Rayben, t = 5 mm M²
4 Kaca Cermin t = 3mm M²
5 Kaca Patri M²
NO MATERIAL SATUAN
6 Sealent Kg
7 Nako + Bingkai (80 x 15) x 10 daun polos Bh
8 Nako + Bingkai (80 x 15) x 10 daun rayben Bh
9 Kaca Es M²
I. BAHAN TRIPLEK
1 Triplek t = 3 mm Lbr
2 Triplek t = 6 mm Lbr
3 Triplek t =9 mm Lbr
4 Multiplek t = 10 mm Lbr
5 Multiplek t = 12 mm Lbr
NO MATERIAL SATUAN
J. BAHAN SANITASI
1 Kloset duduk monoblok Bh
2 Kloset duduk putih (setaraf TOTO) Bh
3 Kloset duduk warna (setaraf TOTO) Bh
4 Kloset jongkok (setaraf TOTO) Bh
5 Kloset jongkok (setaraf INA) Bh
6 Kran air uk 1/2" Bh
7 Pipa paralon dia 1/2" Btg
8 Pipa paralon dia 3/4" Btg
9 Pipa paralon dia 1" Btg
10 Pipa paralon dia 2" Btg
11 Pipa paralon dia 3" Btg
12 Pipa paralon dia 4" Btg
WAKIL WALIKOTA
NO MATERIAL SATUAN
TENTANG
SATUAN BAHAN, UPAH DAN ANALISA
TERDIRI DARI ANALISA E DAN ANALISA
UNG DAN PERUMAHAN (ABK-SNI) KOTA PONTIANAK
UN ANGGARAN 2010
HARGA
HARGA TERMASUK
KEUNTUNGAN KEUNTUNGAN
(OVERHEAD) (OVERHEAD)
(Rp) (Rp)
6,050.00 66,550.00
6,050.00 66,550.00
6,050.00 66,550.00
5,500.00 60,500.00
4,950.00 54,450.00
4,400.00 48,400.00
4,950.00 54,450.00
4,400.00 48,400.00
4,950.00 54,450.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)
M.101 192,500.00
- 215,050.00
- 230,230.00
M.020 246,070.00
M.022 271,060.00
M.023 290,700.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)
M.024 327,030.00
M.025 373,580.00
- 394,900.00
M.026 394,900.00
- 371,360.00
- 9,900.00
M.040 58,370.00
M.080 70,400.00
- 1,400.00
M.050.a 115,060.00
M.050 220,000.00
- 2,200.00
- 3,630.00
- 2,530.00
- 990.00
- 2,530.00
- 2,310.00
- 3,300.00
- 26,400.00
- 50,120.00
- 40,030.00
- 54,450.00
- 64,130.00
- 71,390.00
- 96,250.00
- 98,450.00
- 277,200.00
- 189,420.00
- 453,750.00
- 275,000.00
- 242,000.00
- 46,750.00
- 50,380.00
- 54,890.00
- 8,250.00
- 792,000.00
- 830,500.00
- 880,000.00
- 1,017,500.00
- 1,094,500.00
- 44,000.00
- 11,550.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)
- 1,155,000.00
- 1,485,000.00
- 990,000.00
- 1,105,500.00
- 880,000.00
- 1,122,000.00
- 138,050.00
- 55,000.00
- 3,850.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)
- 9,736,320.00
- 11,463,540.00
- 9,063,230.00
M.181.a 9,350,550.00
M.181.b 7,903,940.00
- 8,116,350.00
- 7,370,770.00
- 8,934,750.00
- 11,892,210.00
- 10,771,200.00
- 10,771,200.00
- 9,453,120.00
M.181.e 16,958,370.00
M.181.d 15,074,070.00
M.181.f 6,660,170.00
M.181.g 11,297,220.00
- 4,630,120.00
- 6,033,170.00
- 11,550,000.00
- 82,500.00
M.181.h 2,194,720.00
M.181.i 3,293,620.00
- 3,724,160.00
- 3,168,550.00
- 2,764,960.00
- 1,883,750.00
- 3,053,270.00
- 3,244,010.00
- 3,949,990.00
- 4,109,820.00
- 2,520,870.00
- 4,947,360.00
- 962,500.00
- 2,046,110.00
M.181.j 4,541,790.00
M.181.k 6,331,160.00
- 9,052,120.00
- 7,562,500.00
M.181.l 1,323,520.00
- 604,780.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)
- 19,360.00
- 20,680.00
- 5,630.00
- 10,450.00
- 66,000.00
- 82,500.00
- 181,500.00
- 16,500.00
- 2,310.00
- 27,940.00
- 42,130.00
- 29,480.00
- 33,000.00
- 36,520.00
- 40,260.00
- 80,080.00
- 42,900.00
- 27,940.00
- 39,160.00
M.090.f 22,990.00
- 32,450.00
- 56,540.00
- 30,910.00
- 44,220.00
- 55,820.00
- 20,400.00
- 137,500.00
- 11,660.00
- 20,350.00
- 44,000.00
- 25,300.00
- 17,710.00
M.090.e 49,500.00
M.090.g 36,520.00
M.090.h 79,200.00
- 34,100.00
M.167 15,510.00
- 17,710.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)
M.168 18,700.00
- 20,900.00
- 26,620.00
M.163 8,250.00
- 11,550.00
- 38,500.00
- 445,500.00
- 17,930.00
- 18,590.00
- 18,590.00
- 5,500.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)
- 110,000.00
- 27,500.00
- 13,750.00
- 148,610.00
- 121,880.00
- 191,510.00
- 269,830.00
- 312,730.00
- 384,450.00
- 614,350.00
- 437,580.00
- 550,000.00
- 82,500.00
- 105,600.00
- 2,392,500.00
- 253,000.00
- 165,000.00
- 2,090,000.00
- 302,500.00
- 14,850.00
- 16,500.00
- 110,000.00
- 24,750.00
- 33,000.00
- 20,350.00
- 11,550.00
- 184,250.00
- 118,250.00
- 179,020.00
- 86,900.00
- 107,250.00
- 123,750.00
- 22,000.00
M.166.a 24,530.00
M.166.b 20,900.00
- 27,500.00
M.166.c 27,500.00
- 28,870.00
- 28,870.00
- 38,500.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)
- 66,000.00
- 330.00
- 11,000.00
- 5,500.00
- 55,000.00
- 71,500.00
- 69,630.00
- 69,630.00
- 67,320.00
- 88,880.00
- 88,880.00
- 93,500.00
- 116,930.00
- 104,530.00
- 117,420.00
- 71,500.00
- 88,000.00
- 85,360.00
- 101,200.00
- 114,400.00
- 128,700.00
- 71,390.00
- 51,370.00
- 52,800.00
- 71,500.00
- 20,900.00
- 60,500.00
- 114,120.00
- 100,370.00
- 127,870.00
- 114,120.00
- 130,900.00
- 55,000.00
- 109,450.00
- 422,400.00
- 146,300.00
- 156,750.00
- 1,045,000.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)
- 111,650.00
- 214,500.00
- 225,500.00
- 167,200.00
- 60,500.00
- 133,100.00
- 165,000.00
- 187,000.00
- 222,200.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)
- 109,340.00
- 64,900.00
- 67,100.00
- 1,705,000.00
- 2,145,000.00
- 2,343,000.00
- 204,600.00
- 137,500.00
- 38,500.00
- 17,820.00
- 27,670.00
- 40,700.00
- 61,820.00
- 117,150.00
- 154,000.00
M.183 4,500.00
- 5,750.00
M.184 5,600.00
M.185 24,200.00
- 42,400.00
M.064 5,100.00
- 6,100.00
- 8,300.00
M.170 57,000.00
- 62,500.00
- 150,000.00
- 63,300.00
13,167,000.00
- 5,458,530.00
- 3,724,980.00
- 5,105,100.00
- 4,274,980.00
- 4,939,000.00
- 544,500.00
- 6,675,900.00
- 5,563,250.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)
- 3,599,750.00
- 7,754,900.00
- 6,805,880.00
- 7,237,010.00
- 7,601,000.00
- 67,217,150.00
- 80,659,700.00
- 10,838,520.00
- 12,362,130.00
- 10,838,300.00
- 11,388,300.00
- 983,010.00
- 982,980.00
- 915,200.00
- 682,000.00
- 517,000.00
- 4,664,000.00
- 3,376,170.00
- 797,500.00
- 249,700.00
- 202,030.00
- 124,850.00
- 842,870.00
- 842,870.00
- 459,430.00
- 374,360.00
- 248,320.00
- 144,550.00
- 409,290.00
- 280,950.00
- 248,320.00
- 148,220.00
- 270,500.00
- 19,610.00
- 16,360.00
- 14,390.00
- 202,950.00
- 148,310.00
- 70,210.00
- 485,550.00
- 485,550.00
- 70,210.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)
- 742,500.00
- 336,600.00
- 324,500.00
- 248,320.00
- 168,520.00
- 280,950.00
- 280,950.00
- 248,320.00
- 140,430.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)
- 336,600.00
- 324,610.00
- 55,450.00
- 55,450.00
- 41,620.00
- 2,100.00
- 3,480.00
- 3,480.00
- 3,480.00
- 4,950.00
- 4,950.00
- 3,940.00
- 6,230.00
- 13,840.00
- 13,100.00
- 9,070.00
- 5,220.00
- 538,080.00
- 131,810.00
- 41,610.00
- 34,650.00
- 137,500.00
- 34,650.00
- 5,500.00
- 6,230.00
- 34,650.00
- 34,650.00
- 27,770.00
- 70,210.00
- 148,220.00
- 83,230.00
- 20,800.00
- 22,180.00
- 31,900.00
- 37,490.00
- 38,860.00
- 51,330.00
- 34,650.00
- 115,500.00
- 44,990.00
- 58,190.00
- 27,680.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)
- 33,360.00
- 51,970.00
- 137,500.00
- 40,240.00
- 79,100.00
- 90,100.00
- 2,970.00
- 4,620.00
- 7,260.00
- 11,220.00
- 6,140.00
- 12,210.00
- 17,500.00
- 16,610.00
- 21,900.00
- 23,740.00
- 23,430.00
- 34,650.00
- 56,260.00
- 76,560.00
- 65,900.00
- 273,350.00
- 305,250.00
- 374,550.00
- 134,560.00
- 86,680.00
- 127,930.00
- 6,500.00
- 5,950.00
- 7,880.00
- 2,970.00
- 4,620.00
- 7,260.00
- 11,220.00
- 12,210.00
- 17,600.00
- 12,280.00
- 22,820.00
- 1,370.00
- 3,570.00
- 8,700.00
- 2,380.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)
- 60,500.00
- 88,270.00
- 122,100.00
- 155,370.00
- 199,740.00
- 271,970.00
- 3,570.00
- 19,700.00
- 5,950.00
- 14,660.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)
- 10,170.00
- 4,400.00
- 5,500.00
- 7,880.00
- 27,680.00
- 10,080.00
- 25,480.00
- 3,110.00
- 5,310.00
- 929,500.00
- 551,320.00
- 449,240.00
- 173,470.00
- 55,450.00
- 27,680.00
- 55,450.00
- 180,300.00
- 7,880.00
- 34,650.00
- 2,010.00
- 2,750.00
- 1,650.00
- 7,090.00
- 9,900.00
- 8,250.00
- 4,120.00
- 55,450.00
- 1,106,050.00
- 7,970.00
- 6,960.00
- 34,650.00
- 1,460.00
- 3,480.00
- 27,770.00
- 17,440.00
- 17,440.00
- 22,110.00
- 27,770.00
- 12,500.00
- 69,390.00
- 69,390.00
- 4,950.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)
- 99,880.00
- 83,230.00
- 55,500.00
- 130,160.00
- 320.00
- 156,200.00
- 27,500.00
- 44,000.00
- 97,070.00
- 97,070.00
- 4,190.00
- 11,130.00
- 840.00
- 13,880.00
- 13,880.00
- 13,880.00
- 124,850.00
- 52,700.00
- 52,700.00
- 235,620.00
- 68,000.00
- 34,650.00
- 34,650.00
- 13,880.00
- 34,650.00
- 34,650.00
- 3,480.00
- 62,420.00
- 911,620.00
- 499,490.00
- 1,327,260.00
- 25,000.00
- 48,560.00
- 48,560.00
- 19,610.00
- 19,610.00
- 2,090.00
- 6,270.00
- 52,020.00
- 124,850.00
- 229,070.00
- 7,650.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)
- 2,090.00
- 9,020.00
- 8,340.00
- 16,680.00
- 43,490.00
- 149,990.00
- 83,230.00
- 97,120.00
- 438,530.00
- 569,430.00
- 1,145,370.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)
- 1,276,270.00
- 1,439,900.00
- 2,810.00
- 13,840.00
- 20,800.00
- 4,900.00
- 6,280.00
- 4,300.00
- 16,680.00
- 55,450.00
- 9,020.00
- 305,250.00
- 20,800.00
- 124,850.00
- 4,190.00
- 8,340.00
- 9,710.00
- 2,810.00
- 980.00
- 1,300.00
- 1,440.00
- 3,850.00
- 4,950.00
- 2,810.00
- 4,190.00
- 8,370.00
- 980.00
- 2,810.00
- 124,880.00
- 52,750.00
- 34,680.00
- 710.00
- 20,800.00
- 901,900.00
- 27,750.00
- 27,750.00
- 27,750.00
- 27,750.00
- 277,500.00
- 592,180.00
- 457,870.00
- 10,690.00
- 17,440.00
- 6,920.00
- 20,800.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)
- 34,690.00
- 62,420.00
- 4,190.00
- 6,420.00
- 34,690.00
- 192,500.00
- 630,850.00
- 7,150,000.00
- 55,000.00
- 6,050,000.00
- 550,000.00
- 366,850.00
- 8,800,000.00
- 66,000.00
- 2,750,000.00
- 165,000.00
- 330,000.00
- 49,500.00
- 4,950,000.00
- 5,500,000.00
- 5,390,000.00
- 8,250,000.00
- 8,800,000.00
- 3,025,000.00
- 3,245,000.00
- 10,560,000.00
- 9,680,000.00
- 17,875,000.00
- 91,208,370.00
- 5,225,000.00
- 733,330.00
- 1,100,000.00
- 11,000,000.00
- 17,416,660.00
- 38,700,470.00
- 5,500,000.00
- 9,533,330.00
TERTANDA
PARYADI, S.Hut
NO KODE ANALISA
1 2
1 P. Ps. 02
2 P. Ps. 03
3 P. Ps. 04
4 P. T. 01
5 P. T. 13
6 P.T.09
7 P. BB. 01
8 P. BB. 04
9 P. BB. 06
10 P. BB. 07
11 P. BB. 08
12 P. BB. 09.a
13 P. BB. 10
14 P. BB. 11.a
15 P. BB. 12.a
16 P. BB. 13.a
17 P. BB. 14
18 P. Dnd. 03
19 P. Pls. 08
20 P. K. 12
21 P. PA. 03
22 P. PA. 18
23 P. Pf. 05
24 P. Snt. 01
25 P. Snt. 10
26 P. Snt. 12
27 P. Snt. 14
28 P. Snt. 15
29 P. KK. 02.a
30 P. KK. 04
NO KODE ANALISA
1 2
31 P. KK. 07
32 P. KK. 09
33 P. LD. 01
34 P. LD. 04
35 P. LD. 08
36 P. Ct. 04
37 P. Ct. 11
ANALISA BIAYA KONSTRUKSI (ABK-SNI)
URAIAN PEKERJAAN
3
1m2 Pembuatan Direksi Keet / Gudang Bahan Bangunan dan Alat / Bedeng Pekerja (P.Ps. 04)
Membuat 1m3 Lantai Kerja Beton Mutu f'c = 7,4 Mpa (K 100), slump (3-6) cm, w/c = 0,87 (P.BB. 01)
Membuat 1m3 Beton Mutu f'c = 19,3 Mpa (K 225), slump (12 ± 2) cm, w/c = 0,58 (P.BB. 04)
Membuat 1m3 Beton Mutu f'c = 26,4 Mpa (K 300), slump (12 ± 2) cm, w/c = 0,52 (P.BB. 06)
Membuat dan Memasang 1m3 Kusen Pintu dan Kusen Jendela, Kayu Kelas I (P.K. 12)
1m2 Pasang Lantai Keramik 40 x 40cm Polished (setaraf Indogress) (P.LD. 04)
1m2 Pengecatan Bidang Kayu Baru (1Lapis Plamir, 1Lapis Cat Dasar, 2Lapis Cat Penutup) (P.Ct. 04)
1m2 Pengecatan Tembok Baru (1 Lapis Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup)
HARGA SATUAN
HAL
(Rp)
4 5
43,043.70
12,750.00
872,409.00
58,875.00
134,790.00
16,395.00
889,576.47
1,151,202.90
1,207,872.37
15,800.00
17,940.50
116,783.10
166,297.50
273,934.70
279,909.20
301,934.70
289,836.50
64,272.90
54,364.84
13,072,075.00
129,055.00
84,211.50
44,539.40
1,526,955.00
19,487.75
43,472.25
104,370.50
41,675.00
236,725.00
38,128.75
HARGA SATUAN
HAL
(Rp)
4 5
42,305.00
196,218.75
201,951.30
273,072.08
214,183.40
40,150.50
18,449.00
REKAPITULASI
( RENCANA ANGGARAN BIAYA )
TOTAL BI
NO. URAIAN PEKERJAAN
(Rp)
1 2 3
A PEKERJAAN PENDAHULUAN
B PEKERJAAN STANDAR
I Pekerjaan Pemasangan Minipile 1,231,158,500.00
II Pekerjaan Pondasi 386,851,722.53
III Pekerjaan Struktur
1. Pekerjaan Struktur Beton Lantai 1 (satu ) 940,154,537.38
2. Pekerjaan Struktur Beton Lantai 2 (dua ) 878,393,894.86
IV Pekerjaan Dinding dan Plesteran
1. Pekerjaan Dinding dan Plesteran ( Lt. 1 ) 273,446,313.68
2. Pekerjaan Dinding dan Plesteran ( Lt. 2 ) 180,796,337.87
V Pekerjaan Plafond
1. Pekerjaan Plafond dan List Profil ( Lt. 1 ) 125,282,570.60
VI Err:509
1. Pekerjaan Mekanikal Elektrikal ( Lt. 1 ) 52,044,100.00
VII Pekerjaan Atap
1. Pekerjaan Atap (Lt. 1) 77,411,909.20
2. Pekerjaan Atap (Lt. 2) 162,407,464.20
VIII Pekerjaan Pengecatan
1. Pekerjaan Pengecatan ( Lt.1 ) 38,406,977.33
JUMLAH BIAYA PEKERJAAN
PPN 10 %
TOTAL JUMLAH BIAYA
DIBULATKAN
TERBILANG : # EMPAT MILYAR DELAPAN RATUS DUA PULUH LIMA JUTA TIGA RATUS ENAM PULU
PITULASI
A ANGGARAN BIAYA )
Puskesmas Tahap I
g. Sehat,Kota Pontianak
TOTAL BIAYA
(Rp)
40,641,764.00
4,346,354,327.65
4,386,996,091.65
438,699,609.17
4,825,695,700.82
4,825,695,000.00
UA PULUH LIMA JUTA TIGA RATUS ENAM PULUH LIMA RIBU RUPIAH #
NO PEKERJAAN
A. PEKERJAAN PENDAHULUAN
1 Pembersihan lokasi
2 Pengukuran & pemasangan Bouwplank
3 Pembuatan Direksi Keet ( 4 x 6 ) m2
4 Papan nama Proyek & Dokumentasi
3 Papan nama Proyek & Dokumentasi
JUMLAH A - - - - - - - - - - - - - - - - - - - - - - - - - - - -
B. PEKERJAAN STANDAR
I Pekerjaan Pemasangan Minipile
1 Pengadaan Tiang Pancang (Mini Pile / Ready Mix ), Uk. 30X30X30 cm (mutu K 300 - 6 m)
2 Pemancangan Mini Pile dengan Hammer Kapasitas 1,5 ton
3 Pembobokan Kepala Tiang Pancang
II Pekerjaan Pondasi
1 Pondasi P1 Uk. 150x150 cm
a. Pek. Galian Tanah
b. Pekerjaan Urugan Pasir Alas Poer Pondasi tbl. 20 cm
c. Pek. Beton Lantai Kerja t. 5 cm ( mutu K-100 )
d. Pek. Pondasi Poer Beton Bertulang
- Cor Beton Poer ( mutu K-300 )
- Pembesian D-16 mm - 15 cm ( rangkap )
- Bekisting Pondasi
e. Pek. Kolom Pondasi Uk. 30x30
- Cor Beton Poer ( mutu K-300 )
- Pembesian Kolom
- Bekisting Kolom Pondasi
f. Urugan Tanah Kembali
2 Pondasi P2 Uk. 125 x 125 cm
a. Pek. Galian Tanah
b. Pekerjaan Urugan Pasir Alas Poer Pondasi tbl. 20 cm
c. Pek. Beton Lantai Kerja t. 5 cm ( mutu K-100 )
e. Pek. Pondasi Poer Beton Bertulang
- Cor Beton Poer ( mutu K-300 )
- Pembesian D-13 mm - 15 cm ( rangkap )
- Bekisting Pondasi
f. Pek. Kolom Pondasi Uk. 30x30
- Cor Beton Poer ( mutu K-300 )
- Pembesian D-16 mm - 15 cm ( rangkap )
- Bekisting Pondasi
i. Urugan Tanah Kembali
NO PEKERJAAN
3 Pondasi P3 Uk. 100x100 cm
a. Pek. Galian Tanah
b. Pekerjaan Urugan Pasir Alas Poer Pondasi tbl. 20 cm
c. Pek. Beton Lantai Kerja t. 5 cm ( mutu K-100 )
d. Pek. Pondasi Poer Beton Bertulang
- Cor Beton Poer ( mutu K-300 )
- Pembesian D-13 mm - 15 cm ( rangkap )
- Bekisting Pondasi
e. Pek. Kolom Pondasi K1
- Cor Beton Poer ( mutu K-300 )
- Pembesian D-13 mm - 15 cm ( rangkap )
- Bekisting Pondasi
f. Urugan Tanah Kembali
4 Pondasi P4 Uk. 150x300 cm
a. Pek. Galian Tanah
b. Pekerjaan Urugan Pasir Alas Poer Pondasi tbl. 20 cm
c. Pek. Beton Lantai Kerja t. 5 cm ( mutu K-100 )
d. Pek. Pondasi Poer Beton Bertulang
- Cor Beton Poer ( mutu K-300 )
- Pembesian D-16 mm - 15 cm ( rangkap )
- Bekisting Pondasi
e. Pek. Kolom Pondasi Uk. 30x30
- Cor Beton Poer ( mutu K-300 )
- Pembesian Kolom
- Bekisting Kolom Pondasi
f. Urugan Tanah Kembali
5 Pondasi P5 Uk. 150x300 cm
a. Pek. Galian Tanah
b. Pekerjaan Urugan Pasir Alas Poer Pondasi tbl. 20 cm
c. Pek. Beton Lantai Kerja t. 5 cm ( mutu K-100 )
e. Pek. Pondasi Poer Beton Bertulang
- Cor Beton Poer ( mutu K-300 )
- Pembesian D-13 mm - 15 cm ( rangkap )
- Bekisting Pondasi
f. Pek. Kolom Pondasi K2
- Cor Beton Poer ( mutu K-300 )
- Pembesian D-16 mm - 15 cm ( rangkap )
- Bekisting Pondasi
i. Urugan Tanah Kembali
NO PEKERJAAN
V Pekerjaan Plafond
1 Pekerjaan Plafond dan List Profil ( Lt. 1 )
a. Rangka Plafond Holow
b. Penutup Plafond Panel GRC
V Pekerjaan Pagar
1. Pekerjaan Struktur Pondasi
a. Pekerjaan Galian Pondasi
b. Pekerjaan Urugan Pasir
c. Pekerjaan Lantai Kerja
d. Pekerjaan Plat Pondasi
- Cor Beton
- Besi Beton
- Bekesting
e. Pekerjaan Kolom Pondasi
- Cor Beton
- Besi Beton
- Bekesting
f. Urugan Tanah Kembali
g. Pekerjaan Sloof
- Cor Beton
- Besi Beton
- Bekesting
h. Pekerjaan Kolom
- Cor Beton
- Besi Beton
- Bekesting
2. Pekerjaan Dinding Pondasi
a. Pekerjaan Dinding Batako
b. Plesteran Dinding Batako
c. Pengecatan dinding
3. Pekerjaan Pagar Hollow
4. Pekerjaan Lampu Pagar
5. Pekerjaan Pagar Hollow 10 m (Lengkap)
6. Pekerjaan Pagar Hollows 14,5 m
7. Pekerjaan Papan Nama Stainless
0.00 24.00 m2 - -
P.Pls.08 335.40 m2 59,801.32 20,057,362.59
Sub Jumlah 1 20,057,362.59
HB 35 m' -
Ventilasi 1 25 unit 272,976.00 6,824,400.00
HB 4.4 m' -
Ventilasi 2 2 unit 495,264.00 990,528.00
HB 26 m2 400,000.00 10,400,000.00
Sub Jumlah 1 286,488,011.51
HB 24 m' -
Ventilasi 1 4 unit 272976 1,091,904.00
HB 24 m' 0 -
Ventilasi 2 4 unit 495264 1,981,056.00
Sub Jumlah 2 234,197,486.93
- 3 bh 58190 174570
- 82 bh 44990 3689180
- 9 bh 34650 311850
- 32 bh 31750 1016000
- 11 bh 37250 409750
- 10 bh 27500 275000
- 2 unit 5812800 11625600
- 1 titik 2000000 2000000
- 147 titik 150000 22050000
Sub Jumlah 1 41551950
- 3 bh 58190 174570
- 77 bh 44990 3464230
- 6 bh 34650 207900
- 31 bh 31750 984250
- 11 bh 37250 409750
- 10 bh 27500 275000
- 1 unit 5812800 5812800
- 1 titik 2000000 2000000
- 96 titik 150000 14400000
Sub Jumlah 2 27728500
HB 45 m2 165000 7425000
P. PA. 03 45 m2 141960.5 6388222.5
P.BA.10 48.8 m' 175475.375 8563198.3
- 26 m' 600000 15600000
Sub Jumlah 1 37,976,420.80
KODE HARGA SATUAN JUMLAH HARGA
VOLUME SATUAN
ANALISA (Rp.) (Rp.)
Jumlah #REF!
ppn 10% #REF!
Total #REF!
Dibulatkan #REF!
Pagu 4,055,260,000.00
Selisih #REF!
#REF!
TAHAP 1 4386996091.65207
TAHAP 2 2252232826.84546
TOTAL : 6638928918.5
Pekerjaan :
Lokasi :
Thn Anggaran:
Uraian
A. PEK. PENDAHULUAN
1 Pembersihan lokasi
2 Pengukuran & pemasangan Bouwplank
3 Pembuatan Direksi keet ( 4 x 6 ) m
4 Pembuatan Bangsal Kerja
5 Papan Nama Proyek
II Pek. PONDASI
1 PEK. PEMANCANGAN MINIPILE - Pjg @ 6 meter
Pengadaan Tiang Pancang (Mini Pile / Ready Mix ), Uk. 30x
Pondasi 1
Pondasi 2
Pondasi 3
Pondasi 4
Pondasi 5
- Bekesting
i Urugan Tanah Kembali
- Bekesting
i Urugan Tanah Kembali
- Bekesting
i Urugan Tanah Kembali
- Bekesting
i Urugan Tanah Kembali
- Bekesting
i Urugan Tanah Kembali
3 Pondasi P3 Uk. 100x100 cm
III PEK. STRUKTUR
1 Pekerjaan Struktur Beton Lantai 1 (satu )
a. Beton Sloof 25/50
- Cor beton K-225
- Tulangan Pokok dia. 16mm -12 btg
- Tulangan Sengkang dia. 8 mm - 15 cm
- Bekesting
- Bekesting
- Bekesting
- Bekesting
- Bekesting
- Bekesting
- Bekesting
- Bekesting
bordes
- Cor beton camp 1:2:3
- Pembesian Wiremseh M-5 ( 2 lapis )
- Bekesting lantai gantung
- Bekesting
- Bekesting
2 Pekerjaan Struktur Beton Lantai 2 (dua )
a. Balok uk. 20/40 cm
- Cor beton camp 1:2:3
- Tulangan Pokok dia. 16mm -6 btg
- Tulangan Sengkang dia. 8 mm - 15 cm
- Bekesting
- Bekesting
- Bekesting
- Bekesting
b. Plesteran dinding
- Plesteran dinding batako
- Plesteran sloof keliling / tutup kolong
b. Plesteran dinding
- Plesteran dinding batako
- Plesteran kolom
b. Err:509
- luas bordes
- luas horizontal
- luas vertikal
c. Err:509
d. Err:509
2 Err:509
a. Err:509
- Luas total lantai 1
b. Err:509
c. Err:509
VI PEK. PLAFOND
1 Pekerjaan Plafond dan List Profil ( Lt. 1 )
a. Rangka Plafond Holow
- Luas total lt 1
c. Err:509
2 Err:509
a. Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
b. Err:509
Err:509
Err:509
Err:509
Err:509
c. Err:509
Err:509
d. Jendela Type J4
Err:509
Err:509
Err:509
Err:509
Err:509
e. Jendela Type J5
Err:509
Err:509
f. Jendela Type J6
Err:509
Err:509
g. Jendela Type J7
Err:509
Err:509
g. Jendela Type J8
Err:509
Err:509
h. Err:509
Err:509
Err:509
c. Err:509
- cat kilat kusen PJV
- cat kilat daun pintu panel
2 Err:509
a. Err:509
- Luas dinding yg di cat
b. Err:509
- luas Plafond yg di cat
c. Err:509
- cat kilat kusen PJV
- cat kilat daun pintu panel
- cat kilat kisi-kisi jendela J7
a. Err:509
Err:509
Err:509
b. Err:509
Err:509
Err:509
f. Err:509
Err:509
Err:509
- Tulangan Pokok dia. 10mm - 4 btg
- Tulangan Sengkang dia. 8 mm - 15 cm
Err:509
g. Err:509
Err:509
Err:509
Err:509
h. Err:509
Err:509
Err:509
Err:509
i. Err:509
j. Err:509
2 Pondasi P6 (3 Unit)
a. Pek. Galian Tanah
b. Pekerjaan Urugan Pasir Alas Poer Pondasi t 20 cm
c. Pek. Lantai Kerja t. 5 cm
d. Pek. Pondasi Poer Beton Bertulang
- Cor Beton K-300
- Besi dia. 13 mm - 15 cm ( rangkap )
- Bekisting
e. Besi Stek kolom pada poer pondasi
- Tulangan Pokok dia. 16mm - 8 btg
- Tulangan Sengkang dia. 8 mm - 15 cm
Uraian
K. PENDAHULUAN
mbersihan lokasi
gukuran & pemasangan Bouwplank
mbuatan Direksi keet ( 4 x 6 ) m
mbuatan Bangsal Kerja
an Nama Proyek
. PONDASI
K. PEMANCANGAN MINIPILE - Pjg @ 6 meter
gadaan Tiang Pancang (Mini Pile / Ready Mix ), Uk. 30x30x30 cm (mutu K 300 -
on Sloof 25/45
r beton camp 1:2:3
angan Pokok dia. 16mm -12 btg
angan Sengkang dia. 8 mm - 15 cm
on Sloof 20/40
r beton camp 1:2:3
angan Pokok dia. 16mm -6 btg
angan Sengkang dia. 8 mm - 15 cm
on Sloof 15/30
r beton camp 1:2:3
angan Pokok dia. 13mm -4 btg
angan Sengkang dia. 8 mm - 15 cm
on Kolom 30/30 ( K2 )
r beton camp 1:2:3
angan Pokok dia. 19mm - 6 btg
angan Pokok dia. 16mm - 2 btg
angan Sengkang dia. 8 mm - 15 cm
om Uk. 30x30
r beton camp 1:2:3
angan Pokok dia. 19mm - 12 btg
angan Sengkang dia. 8 mm - 15 cm
teran dinding
Plesteran dinding batako
Plesteran sloof keliling / tutup kolong
teran dinding
Plesteran dinding batako
Plesteran kolom
amik Lantai uk. 40x40 (anti gores ) untuk ruang dalam + teras dpn + blkg
Luas total ruang dalam lantai 1
pengurangan luas km/wc
Luas lantai teras depan + tangga teras
Luas lantai teras belakang + tangga teras
luas bordes
luas horizontal
luas vertikal
K. PLAFOND
aan Plafond dan List Profil ( Lt. 1 )
gka Plafond Holow
Luas total lt 1
pengurangan luas void tangga
Luas plafond kaki atap lt 1
dalam ruangan
koridor
tu Type P1
tu Type P2
dela Type J1
dela Type J2
dela Type J3
dela Type J4
dela Type J4
dela Type J5
dela Type J6
dela Type J7
dela Type J8
Err:509
Err:509
Err:509
ndasi P6 (3 Unit)
Galian Tanah
erjaan Urugan Pasir Alas Poer Pondasi t 20 cm
Lantai Kerja t. 5 cm
Pondasi Poer Beton Bertulang
r Beton K-300
si dia. 13 mm - 15 cm ( rangkap )
5 6
Unit Jumlah
PondasiTiap 1 Unit sambungan
Pondasi
40 4 3 160
40 4 3 160
5 1 1 5
1 8 3 8
2 8 3 16
1,037.00 6 6,222.00
349 0
40 unit
40.00 1.50 1.50 0.80 1.80
40.00 1.50 1.50 0.20 0.45
40.00 1.50 1.50 0.05 0.11
X Y
40.00 1.50 1.50 0.40 0.90
40.00 37.40 37.40 1.58 118.05
40.00 1.50 1.50 0.40 2.40
40 unit
40 0.30 0.30 1.20 0.11
40 2.15 10 1.04 22.40
40 0.96 18.00 0.39 6.82
40 unit
40.00 1.25 1.25 0.80 1.25
40.00 1.25 1.25 0.20 0.31
40.00 1.25 1.25 0.05 0.08
X Y
40.00 1.50 1.50 0.40 0.90
40.00 37.40 37.40 1.58 118.05
40.00 1.50 1.50 0.40 2.40
40 unit
40 0.30 0.30 1.20 0.11
40 2.15 10 1.04 22.40
40 0.96 18.00 0.39 6.82
5 unit
5.00 1.00 1.00 0.80 0.80
5.00 1.00 1.00 0.20 0.20
5.00 1.00 1.00 0.05 0.05
X Y
5.00 1.00 1.00 0.40 0.40
5.00 19.20 19.20 1.58 60.60
5.00 1.00 1.00 0.40 1.60
2 unit
2 0.30 0.30 1.20 0.11
2 2.15 8 0.89 15.27
2 0.96 18.00 0.39 6.82
1 unit
1.00 1.50 3.00 0.80 3.60
1.00 1.50 3.00 0.20 0.90
1.00 1.50 3.00 0.05 0.23
X Y
1.00 1.50 3.00 0.40 1.80
1.00 71.40 70.40 1.58 223.79
1.00 1.50 3.00 0.40 3.60
2 unit
2 0.30 0.30 1.20 0.11
2 2.15 10 1.04 22.40
2 0.96 18.00 0.39 6.82
2 unit
2.00 1.50 3.00 0.80 3.60
2.00 1.50 3.00 0.20 0.90
2.00 1.50 3.00 0.05 0.23
X Y
2.00 1.50 1.50 0.40 0.90
2.00 37.40 37.40 1.58 118.05
2.00 1.50 1.50 0.40 2.40
4 unit
4 0.30 0.30 1.20 0.11
4 2.15 10 1.04 22.40
4 0.96 18.00 0.39 6.82
81 unit
81 0.30 0.30 4.50 0.41
81 5.45 10 1.04 56.78
81 0.96 40.00 0.39 15.15
2 unit
2 0.30 0.30 4.50 0.41
2 5.45 8 1.04 45.43
2 5.45 2 1.58 17.20
2 0.96 40.00 0.39 15.15
28 unit
1 unit
1 0.20 0.30 28.60 1.72
1 29.55 6 1.04 184.73
1 0.76 201.00 0.39 60.27
61 unit
61 0.30 0.30 4.00 0.36
61 4.00 10 1.04 41.68
61 0.96 28.00 0.39 10.61
339
339 5.00
115 0.50
-1 153.84
2 sisi 1598.66
-1 115 0.50 57.50
260.5
260.5 4.50
-1 147.72
2 sisi 1045.05
61 0.35 0.35 4.00 5.60
510.88
1 466.78
-1 7.00 6.00 42.00
1 14.75 5.00 19.75
1 3.10 5.00 8.10
1.9 1.55
2 0.95 3.9
2 0.95 2.1
7.00 6.00
8 unit
8 7.00 1.50
8 0.78 1.5
348.28
1 348.28
-1 7.00 6.00 42.00
-1 5.00 2.00 10.00
7.00 6.00
8 unit
8 7.00 1.50
8 0.78 1.5
1 667.00
-1 1 1 18.00
1
1 582.00
1
1 502 502.00
1 119 119.00
3 unit
3 1.6 3 0.01 0.04
3 0.85 2.30 2
6 4.00
3 1.00
3 2.00
7 unit
7 1.2 2.2 0.01 0.03
7 0.85 2.30 2
14 4.00
7 1.00
7 2.00
17 unit
17 0.9 2.2 0.01 0.03
17 0.82 2.35 1
17 4.00
17 1.00
0.78 2.12
12 unit
12 1.1 1.35 6.25
12 2
24 0.32 0.62 0.20
24 0.40 0.40 1.60
24 0.32 0.32 0.10
3 unit
3 2.16 1.86 10.20
3 0.57 1.38 0.79
3 0.57 1.08 0.62
9 unit
9 0.68 2.34 8.38
9 0.65 0.48 0.31
7 unit
7 1.12 2.67 7.58
7 0.32 0.32 0.10
6 unit
6 0.40 0.60 2.00
6 0.32 0.32 0.10
5 unit
5 1.2 2.2 0.01 0.03
5 0.85 2.30 2
10 4.00
5 1.00
5 2.00
9 unit
9 0.9 2.2 0.01 0.03
9 0.82 2.35 1
9 4.00
9 1.00
0.78 2.12
18 unit
18 1.12 2.67 10.25
18 2
36 0.32 0.62 0.20
36 0.40 0.40 1.60
36 0.32 0.32 0.10
11 unit
11 1.10 1.19 5.77
11 0.65 0.48 0.31
1 unit
1 1.74 5.20 17.36
1 1.1 1.8 3.96
1 unit
1 2.4 1.1 0.01 0.04
1 1.1 1.1 1.21
1 unit
1 1.76 7 0.01 0.12
1 1.1 7 7.70
2 unit
2 0.40 0.60 2.00
2 0.32 0.32 0.10
1 230.26
1 36.30
1 232.76
2 11.395 5.25 59.82
1 21.31
1 106.09 106.09
1 96.85 54.05 150.90
1 3139.82
1 649.00
1 2090.10
1 582.00
10.00 4 0.62
0.28 68.00 0.39
10.32 0.12
2 10.32 2.47
2 10.32
2.00 1.00 0.12
2 2.00 2.47
27 unit
27 1.50 1.50 0.65 1.46
27 1.50 1.50 0.20 0.45
27 1.50 1.50 0.05 0.11
X Y
27 1.50 1.50 0.40 0.90
27 37.40 37.40 1.04 77.93
27 1.50 1.50 0.40 2.40
0.35 0.35
27 2.45 8 2.23 43.62
27 1.16 13.00 0.39 5.95
3 unit
3 1.20 1.00 0.65 0.78
3 1.20 1.00 0.20 0.24
3 1.20 1.00 0.05 0.06
10 unit
10 1.50 1.50 0.65 1.46
10 1.50 1.50 0.20 0.45
10 1.50 1.50 0.05 0.11
667.00 m2
120.00 m'
30.00 m2
1.00 unit
1.00 unit
1,037.00 btg
480.00
480.00
5.00
24.00
48.00
6,222.00 m'
349.00 titik
349.00 titik
72.00 m3
18.00 m3
4.50 m3
36.00 m3
4,722.09 Kg
96.00 m2
4.32 m3
896.02 kg
272.80 kg
1,168.82 kg
57.60 m2
17.28 m3
50.00 m3
12.50 m3
3.13 m3
36.00 m3
4,722.09 Kg
96.00 m2
4.32 m3
896.02 kg
272.80 kg
1,168.82 kg
57.60 m2
17.28 m3
4.00 m3
1.00 m3
0.25 m3
2.00 m3
303.02 Kg
8.00 m2
0.22 m3
30.54 kg
13.64 kg
44.18 kg
2.88 m2
0.36 m3
3.60 m3
0.90 m3
0.23 m3
1.80 m3
223.79 Kg
3.60 m2
0.22 m3
44.80 kg
13.64 kg
58.44 kg
2.88 m2
1.76 m3
7.20 m3
1.80 m3
0.45 m3
1.80 m3
236.10 Kg
4.80 m2
0.43 m3
89.60 kg
27.28 kg
116.88 kg
5.76 m2
1.73 m3
9.74 m3
1,281.52 kg
609.93 kg
1,891.45 kg
103.53 m2
1.07 m3
162.53 kg
75.00 kg
237.53 kg
11.83 m2
19.66 m3
2,925.61 kg
886.72 kg
3,812.33 kg
266.76 m2
0.95 m3
146.28 kg
38.94 kg
185.22 kg
17.90 m2
32.81 m3
4,599.40 kg
1,227.15 kg
5,826.55 kg
437.40 m2
0.81 m3
90.85 kg
34.41 kg
30.30 kg
155.56 kg
10.80 m2
4.54 m3
883.81
235.68
1,119.49 kg
151.20 m2
80.04 m3
3,289.64 kg
667.00 m2
667.00 m2
0.56 m3
10.92
71.12
82.04 kg
14.21 m2
1.08 m3
35.51 kg
0.03 m2
1.72 m3
184.73 kg
60.27 kg
245.00 kg
28.60 m2
8.48 m3
883.52 kg
268.17 kg
1,151.69 kg
106.00 m2
30.10 m3
4,749.87 kg
950.35 kg
5,700.22 kg
376.20 m2
21.96 m3
2,542.20 kg
647.21 kg
3,189.41 kg
292.80 m2
3.11 m3
605.26
121.05
726.31 kg
103.55 m2
55.80 m3
2,752.06 kg
558.00 m2
558.00 m2
19.02 m3
1,501.22 kg
495.52 kg
600.74 kg
2,597.48 kg
237.80 m2
9.17 m3
452.26 kg
91.70 m2
91.70 m2
1,695.00 m2
57.50
(153.84) m2
1,598.66 m2
3,197.32 m2
(57.50) m2
3,139.82 m2
1,172.25 m2
20.52 m2
(147.72) m2
1,045.05 m2
2,090.10 m2
m2
2,090.10 m2
466.78 m2
(42.00) m2
19.75 m2
8.10 m2
452.63 m2
2.95 m2
7.41 m2
3.99 m2
14.35 m2
42.00 m2
84.00 m2
9.36 m2
74.64 m2
348.28 m2
(42.00) m2
(10.00) m2
296.28 m2
42.00 m2
84.00 m2
9.36 m2
74.64 m2
667.00 m2
(18.00) m2
- m2
649.00 m2
649.00 m2
- m'
- m'
- m'
582.00 m2
- m2
582.00 m2
582.00 m2
502.00 m'
119.00 m'
621.00 m'
0.11 Err:509
6.00 Err:509
24.00 Err:509
3.00 Err:509
6.00 Err:509
0.20 Err:509
14.00 Err:509
56.00 Err:509
7.00 Err:509
14.00 Err:509
0.45 Err:509
17.00 Err:509
68.00 Err:509
17.00 Err:509
7.00 Err:509
75.00 Err:509
24 Err:509
4.76 Err:509
38.40 Err:509
2.46 Err:509
30.60 Err:509
2.36 Err:509
1.85 Err:509
75.42 Err:509
2.81 Err:509
53.06 Err:509
0.72 Err:509
12.00 Err:509
0.61 Err:509
0.14 Err:509
10.00 Err:509
40.00 Err:509
5.00 Err:509
10.00 Err:509
0.24 Err:509
9.00 Err:509
36.00 Err:509
9.00 Err:509
2.00 Err:509
184.50 Err:509
36 Err:509
7.14 Err:509
57.60 Err:509
3.69 Err:509
63.47 Err:509
3.43 Err:509
17.36 Err:509
3.96 Err:509
0.04 Err:509
1.21 Err:509
0.12 Err:509
7.70 Err:509
4.00 Err:509
0.20 Err:509
230.26 m2
36.30 m2
232.76 m2
119.65 m2
21.31 m2
640.28 m2
640.28 m2
106.09 m'
150.90 m'
3,139.82 m2
3,139.82 m2
649.00 m2
649.00 m2
28.00 m2
88.98 m2
28.00 m2
2,090.10 m2
2,090.10 m2
582.00 m2
582.00 m2
21.00 m2
73.79 m2
5.28 m2
100.07 m2
26.35 m'
46.00 m'
65.30 m'
4.75 m3
50.00 btg
0.53 m3
0.40 m3
13.02 Kg
1.02 m2
0.18 m3
31.56 kg
10.61 kg
42.17 kg
6.14 m2
0.14 m3
24.66 kg
7.51 kg
32.17 kg
3.60 m2
1.24 m3
50.90 kg
20.64 m2
0.24 m3
9.86 kg
2.00 m2
2.00 unit
1.00 unit
39.49 m3
12.15 m3
3.04 m3
24.30 m3
2,104.19 Kg
64.80 m2
1,177.77 kg
160.65 kg
1,338.42 kg
2.34 m3
0.72 m3
0.18 m3
1.44 m3
137.53 Kg
5.28 m2
45.45 kg
11.28 kg
56.73 kg
14.63 m3
4.50 m3
1.13 m3
9.00 m3
779.33 Kg
24.00 m2
436.21 kg
64.60 kg
500.81 kg
LAMPIRAN 2 : KEPUTUSAN WALIKOTA PONTIANAK
NOMOR : ………………… TAHUN 2010
TANGGAL : ……………-…………2010
TENTANG
DAFTAR HARGA SATUAN TANAMAN HIAS
DI KOTA PONTIANAK TAHUN 2010
Periode : Januari 2010
I. RUMPUT (LAWN)
1 Rumput gajah ( Axonopus sp )
a. Tandur 100 Titik/M2 M2
b. Lempeng, jarak lempeng + 2 cm 25 x 25 cm M2
2 Rumput golf (Tifton grass) Tandur 100 Titik/M2 M2
3 Rumput manila (Zoysia matrela),jrk lempeng 2 cm 25 x 25 cm M2
4 Rumput manila (Zoysia matrela) Tandur 100 Titik/M2 M2
II PENUTUP TANAH
1 Anggrek tanah (Sphatoglotis plicata), rumpun 35 - 40 2 btg, 3 anakan Polybag
2 Bayam merah (Alteanthera ficoidea), rumpun 20 - 25 1 btg/rumpun Polybag
3 Beludru coklat (Episcia reptans) 7 - 10 Tajuk 10 - 15 Polybag
4 Beludru Hijau (Episcia reptans) 7 - 10 Tajuk 10 - 15 Polybag
5 Botan (Centaurea candisina) 25 - 30 1 btg Polybag
6 Cendrawasih (Phyllantus sp) 15 - 20 Tajuk 20 - 25 Polybag
7 Cocor bebek (Kalanchoe pinnata) 15 - 20 1 btg Polybag
8 Crossandra 20 - 40 Tajuk 20 - 25 Polybag
9 Dinding ari (Hemigraphis colorata) 7 - 10 3 s/d 4 btg/rpn Polybag
10 Dracaena Tricolor 30 Polybag
11 Gandarusa 15 3 s/d 4 btg/rpn Polybag
12 Jengger ayam air mancur daun besar 15 - 20 dia. 1 btg Polybag
13 Jengger ayam air mancur daun kecil 15 - 20 dia. 1 btg Polybag
14 Jengger ayam a.m. protol besar 20 - 25 dia. Btg 1 cm Polybag
15 Jengger ayam a.m. protol kecil 20 - 25 dia. Btg 1 cm Polybag
16 Kembang coklat putih (Zyphyranthes sp) 15 - 20 Tajuk 15 - 20 Polybag
17 Kembang coklat merah muda (Zyphyranthes sp) 15 - 20 Tajuk 15 - 20 Polybag
18 Krokot (Althernantera amoenna) 10 5 btg/rpn Polybag
19 Lili paris bintang (Chlorophytum sp) 10 - 12 1 btg/rpn Polybag
20 Lili paris kasar (Ophiopogon jaburan) 20 - 25 5 s/d 7 btg/rpn Polybag
21 Lili paris kasar (Ophiopogon jaburan) 25-35 5 s/d 7 btg/rpn Polybag
22 Lili paris kucai (Chlorophytum sp) 10 3 s/d 5 btg/rpn Polybag
21 Lili paris umbi (Chlorophytum sp) 10 3 s/d 5 btg/rpn Polybag
22 Lili paris brazil (Chlorophytum sp) 15 - 20 3 s/d 5 btg/rpn Polybag
24 Mirten perak (Malphigia sp) 20 - 25 3 s/d 5 btg/rpn Polybag
25 Mirten rebah (Malphigia sp) 10 - 15 Tajuk 10 - 15 Polybag
26 Mirten tegak (Malphigia sp) 30 - 35 3 btg/rpn Polybag
27 Nanas kerang (Rhoeo discolor) 3-5 1 btg Polybag
28 Nanas merah (Ananas sp) 15-20 Tajuk 20 - 25 Polybag
NO JENIS BAHAN PERTAMANAN UKURAN
TINGGI DIAMETER UNIT
(cm) (cm)
28 Nanas merah (Ananas sp) 30-40 Tajuk 20 - 25 Polybag
29 Seruni rambat (Wedelia trilobata) 10 3 s/d 5 btg/rpn Polybag
30 Sutra bombai banci (Portulacca sp) 7 - 10 3 s/d 5 btg/rpn Polybag
31 Sutra bombai ungu (Portulacca sp) 7 - 10 3 s/d 5 btg/rpn Polybag
32 Tagetes (Tagetes erecta) 20 - 25 Tajuk 15 - 20 Polybag
33 Nanas kerang (Rhoeo discolor) 20 1 btg Polybag
34 Katis kodok hijau (Sansiviera sp) isi 10 10 10 btg/pot Polybag
35 Katis kodok kuning (Sansiviera sp) isi 10 10 10 btg/pot Polybag
NO JENIS BAHAN PERTAMANAN UKURAN
TINGGI DIAMETER UNIT
(cm) (cm)
1 2 3 4 5
36 Pedang-pedangan strip kuning (Sansiviera sp) 30 - 35 5 s/d 7 btg/rpn Polybag
37 Pedang-pedangan strip hijau (Sansiviera sp) 30 - 35 5 s/d 7 btg/rpn Polybag
38 Pandan Kuning Africa 30 Polybag
39 Pangkas kuning kecil (Duranta repens) 10 3 s/d 5 btg/rpn Polybag
40 Pangkas kuning sedang (Duranta repens) 15 3 s/d 5 btg/rpn Polybag
41 Lantana Warna-Warni 15 3 s/d 5 btg/rpn Polybag
42 Taiwan Beauty bunga ungu (Cuphea sp) 25 Tajuk 15 Polybag
44 Taiwan Beauty bunga ungu (Cuphea sp) 16 Tajuk 15 Polybag
45 Cover Crop (Kacang-kacangan) 7-10 10 btg / rpn Polybag
III PERDU
1 Agave putih (Agave sp) 40 dia. Tajuk 30 Polybag
2 Agave biasa (Agave sp) 50 dia. Tajuk 40 Polybag
3 Aglonema (Aglaonema sp) 40 3 btg Polybag
4 Bilawan (Plumbago aphylia) 10 - 15 3 btg Polybag
5 Bougenvil berbunga bentukan penuh 60 dia.Tajuk 60 Polybag
6 Bougenvil hawai (Bougainvillea sp) 60 dia.Tajuk 60 Polybag
7 Bougenvil Biasa 60 dia.Tajuk 60 Polybag
8 Dendron biasa (Phillodendron sp) 15 - 20 1 btg Polybag
9 Dendrose lokal Jkt Merah 20 - 40 dia.Tajuk 10-15 Polybag
10 Balanceng india (Dieffenbachia sp) 30 3 daun/btg Polybag
11 Dracena tricolor (Dracena sp) 30 dia. Tajuk 30 Polybag
12 Kacapiring (Gardenia sp) 50 dia. Tajuk 30 Polybag
13 Pisang-pisangan (Heliconia sp) bunga
kuning / merah 50 2 s/d 3 btg/rpn Polybag
14 Spatiphylum lokal (Spatiphylum sp) 15 - 20 3 bth/pot Polybag
15 Spatiphylum luar (Spatiphylum sp) 15 - 20 3 btg Polybag
16 Beringin putih kecil (Ficus hybrida) ex Jkt 30 diaTajuk 15 -20 Polybag
17 Kamboja jepang (Adenium cutanium) bercabang 30 dia.Tajuk 15-20 Polybag
18 Kamboja putih 100 dia. Btg 3 Polybag
19 Kamboja rantai 100 dia. Btg 3 Polybag
20 Kana (Canna hibrida) 40 2 s/d 3 btg/rpn Polybag
21 Kastuba (Euphorbia pulcherima) 25 - 30 dia. Tajuk 30 Polybag
22 Kembang sepatu putih (Hibiscus mutabilis) 30 1 btg/pot Polybag
23 Lusiana 50 - 75 dia. Btg 1,5 Polybag
24 Mawar putih (Rosa Hybrida) 25 dia.Tajuk15 -20 Polybag
25 Mawar merah (Rosa Hybrida) 30 dia.Tajuk 15-20 Polybag
26 Melati costa (Jasminum sp) 50 2 anakan/rpn Polybag
27 Melati Gambir (Jasminum sp) 50 2 anakan/rpn Polybag
28 Melati Malaysia Polybag
29 Oleander (Nerium indicum) 30 1 rpn Polybag
30 Pepayungan (Cyperus altemifolius) 60 5 anakan/pot Polybag
31 Pandan hijau jepang (Pandanus sp) 50 1 rpn Polybag
32 Pandan kuning afrika 50 1 rpn Polybag
33 Pangkas Hijau 10 3 s/d 5 btg/rpn Polybag
33 Pangkas Hijau 20-40 3 s/d 5 btg/rpn Polybag
34 Variegata Polybag
34 Sambang darah 50 dia. Tajuk 30 Polybag
35 Siklok Polybag
36 Wali songo daun kecil (Scheffera sp) 50 1 btg/pot Polybag
NO JENIS BAHAN PERTAMANAN UKURAN
TINGGI DIAMETER UNIT
(cm) (cm)
37 Soka bangkok (Ixora sp) 20 1 btg/pot Polybag
38 Soka jepang bunga orange (Ixora sp) 20 1 btg/pot Polybag
39 Soka philipina (Ixora sp) 20 1 btg/pot Polybag
40 Soka siantan (Ixora tricia) 20 1 btg/pot Polybag
NO JENIS BAHAN PERTAMANAN UKURAN
TINGGI DIAMETER UNIT
(cm) (cm)
1 2 3 4 5
41 Soka singapura (Ixora cocineae) bunga
putih, pink 30 1 btg/pot Polybag
42 Soka jawa/hawai (Ixora sp) 30 1 btg/pot Polybag
43 Terang bulan daun putih/kuning (Thitonia sp) 20 3 s/d 5 btg/rpn Polybag
44 Tombak raja (Yucca gloriosa) 40 3 s/d 5 btg/rpn Polybag
45 Tapak dara 10 - 15 3 s/d 5 btg/rpn Polybag
46 Pangkas Hijau 3-5 3 s/d 5 btg/rpn Polybag
47 Pangkas Hijau 20 4 s/d 7 btg/rpn Polybag
48 Bayam Merah 10 - 15 3 s/d 5 btg/rpn Polybag
49 Soka Merah 20 1 btg/pot Polybag
50 Bawang-bawangan 15-20 f5 s/d 7 btg/rpn Polybag
51 Bawang-bawangan 20-25 f5 s/d 7 btg/rpn Polybag
52 Veberia Polybag
53 Vinolia 20-30 5 s/d 10btg/rpn Polybag
54 Vinolia 10-15 2 s/d 4 btg/rpn Polybag
55 Vinolia 35-40 12sd 20 btg/rpn Polybag
56 Variegata Polybag
57 Aires Polybag
58 Ketela Merah 10 1sd 2 btg/rpn Polybag
59 Kana Presiden 15 - 20 1sd 2 btg/rpn Polybag
IV TANAMAN PAGAR
1 Kedondong laut (Nothopanax sp) 30-65 3 s/d 4 btg/rpn Polybag
2 Kedondong laut (Nothopanax sp) 60 - 75 3 s/d 4 btg/rpn Polybag
3 Kemuning (Murraya paniculata) 75 1 btg/rpn Polybag
4 Lantana pagar (Lantana camara) 30 1rpn Polybag
5 Mangkokan (Nothopanax sp) 50 3 s/d 4 btg/rpn Polybag
6 Mirten pagar (Malphigia sp) 50 3 s/d 4 btg/rpn Polybag
7 The-tehan tinggi (Durantha repens) 30 3 s/d 4 btg/rpn Polybag
8 The-tehan tinggi (Durantha repens) 50 3 s/d 4 btg/rpn Polybag
9 The-tehan tinggi (Durantha repens) 70 3 s/d 4 btg/rpn Polybag
10 Krokot 15 Polybag
V TANAMAN MERAMBAT
1 Air mata pengantin ( Antigonon leptapus) 30 dia. Tajuk 430 Polybag
2 Air mata pengantin ( Antigonon leptapus) 50 dia. Tajuk 40 Polybag
2 Alamanda (Alamanda cathartica) 30 dia. Tajuk 20 Polybag
3 Alamanda (Alamanda cathartica) 50 dia. Tajuk 40 Polybag
4 Arabidea (Arabidea sp) 40 dia. Tajuk 30 Polybag
5 Flame of irian (Orange) 40 dia. Tajuk 30 Polybag
6 Kembang kelinci (Ipomea sp) 40 dia. Tajuk 30 Polybag
7 Kembang sungsang (Gloriosa superba) 30 dia. Tajuk 20 Polybag
8 Lantana rambut ungu (Lantana sp) 20 3 s/d 4 btg/rpn Polybag
9 Pasiflora 60 dia. Tajuk 40 Polybag
10 Sirih Gading daun strip kuning (Scindapsus sp) 30 3 s/d 4 btg/rpn Polybag
11 Sthephanot bunga putih
(Sthepanothis floribunda) 30 dia. Tajuk 40 Polybag
12 Nona Makan Sirih 30 Polybag
13 Ubi rambat Kuning 30 Polybag
NO JENIS BAHAN PERTAMANAN UKURAN
TINGGI DIAMETER UNIT
(cm) (cm)
VI TANAMAN HIAS
1 Anjuang hijau (Dracaena sp) 60 dia. Tajuk 40 Polybag
2 Anjuang kribo (Dracaerna sp) 60 dia. Tajuk 40 Polybag
3 Anjuang kuning (Dracaerna sp) 60 dia. Tajuk 40 Polybag
NO JENIS BAHAN PERTAMANAN UKURAN
TINGGI DIAMETER UNIT
(cm) (cm)
1 2 3 4 5
4 Anjuang merah (Cordelyne terminalis) 40 dia. Tajuk 20 Polybag
5 Anjuang merah (Cordelyne terminalis) 60 dia. Tajuk 40 Polybag
6 Anjuang merah (Cordelyne terminalis) 80 dia. Tajuk 50 Polybag
7 Anjuang suji (Dracaena sp) 60 dia. Tajuk 40 Polybag
8 Azalea (Azalea sp) 50 dia. Tajuk 40 Polybag
9 Bakung kecil (Hymenochalys sp) 20 dia. Tajuk 40 Polybag
10 Beringin bonsai (Ficus benjamina) 100 - 200 dia. Tajuk 100 Polybag
11 Beringin bonsai bentukan (Ficus benjamina) 100 - 200 dia. Tajuk 100 Polybag
12 Beringin bonsai putih (Ficus benjamina) 250 dia. Tajuk 100 Polybag
13 Bonsai serut 151 - 200 dia. Tajuk 100 Polybag
14 Nusa indah merah/putih (Nussaenda sp) 50 dia. Tajuk 40 Polybag
15 Rambusa 50 Polybag
16 Pakis kelabang kuning (Neprolephis sp) 40 5 s/d 7 btg/rpn Polybag
17 Pakis krol (Neprolephis sp) 40 5 s/d 7 btg/rpn Polybag
18 Pakis monyet (Alsophila glauca) 150 - 200 dia. Tajuk 40 Polybag
19 Pisang kipas (Ravanela madagaskariensis) 200 - 250 dia. Btg 10 Polybag
20 Puring bor (Codiaeum sp) 75 dia. Tajuk 30 Polybag
21 Puring buntut (Codiaeum sp) 75 dia. Tajuk 30 Polybag
22 Puring gelatik (Codiaeum sp) 75 dia. Tajuk 30 Polybag
23 Puring jet (Codiaeum sp) 40 dia. Tajuk 20 Polybag
24 Puring jet (Codiaeum sp) 75 dia. Tajuk 30 Polybag
25 Puring ketapang (Codiaeum sp) 50 dia. Tajuk 30 Polybag
26 Puring nuri (Codiaeum sp) 60 dia. Tajuk 30 Polybag
27 Puring Kuning 20 dia. Tajuk 30 Polybag
28 Siklok dia. Btg 5 Polybag
29 Sikas/Pakis haji halus (Cycas revoluta) 80 dia. Btg 7,5 Polybag
30 Sikas diameter tajuk daun (Cycas sp) 100 dia. Btg 10 Polybag
31 Sikas medan (Cycas sp) 100 dia. Btg 10 Polybag
32 Sikas/pakis haji kasar (Cycas rumpi) 50 - 100 dia. Btg 7,5 Polybag
33 Kamboja kuning (Bali) tinggi (Plumeria sp) 150 - 200 dia. Btg 3 Polybag
34 Kamboja orange tinggi (Plumeria sp) 150 - 200 dia. Btg 3 Polybag
35 Lidah Buaya Besar 10-25 2-3 btg/pot Polybag
36 Lidah Buaya Kecil 50 5-7 btg/pot Polybag
VII PALEM
1 Kelapa gading (Cocos capitata) 200 - 250 dia. Btg 20 Phn
2 Kelapa sawit (Elais guineensis) 200 - 250 dia. Btg 40 Phn
3 Kelapa sayur (Cocos nucifera) 200 - 250 dia. btg 30 Phn
4 Kurma (Phoenix daetilifera) 100 dia. btg 30 Phn
5 Kurma (Phoenix daetilifera) >200 dia. Btg 40 Phn
6 Lontar (Borassus flabefiter) 300 dia. Btg 25 Phn
7 Palm anggur (Lalania loglgessu) 100 dia. Btg 15 Phn
8 Palm alexander 150 dia. Btg 10 Phn
9 Palm botol 150 - 200 dia. btg 30 Phn
10 Palm camedoria 100 3 s/d 5 btg/rpn Phn
11 Palm camedoria 200 3 s/d 5 btg/rpn Phn
12 Palm ekor tupai 50-75 Phn
13 Palm ekor tupai 200 dia. Btg 15 Phn
14 Palm jepang (Ptychosperma macarthurii) 100 - 150 5 s/d 7 btg/rpn Rmp
15 Palm jepang (Ptychosperma macarthurii) 150 - 250 5 s/d 7 btg/rpn Rmp
NO JENIS BAHAN PERTAMANAN UKURAN
TINGGI DIAMETER UNIT
(cm) (cm)
16 Palm kol (Licuala grandis) 100 dia. Btg 10 Phn
18 Palm kuning (Chrysalidocarpus lutescens) 50 - 100 3 s/d 5 btg/rpn Phn
19 Palm kuning (Chrysalidocarpus lutescens) 100 - 150 5 s/d 7 btg/rpn Rmp
20 Palm korembusa 50 dia. Btg 5 Phn
NO JENIS BAHAN PERTAMANAN UKURAN
TINGGI DIAMETER UNIT
(cm) (cm)
1 2 3 4 5
21 Palm korembusa 100 dia. Btg 7 Phn
22 Palm korembusa >200 dia. Btg 10 Phn
23 Palm merah (Cyrtotachis lakka) 150 - 200 3 s/d 5 btg/rpn Phn
24 Palm merah (Cyrtotachis lakka) 300 - 350 5 s/d 7 btg/rpn Rmp
25 Palm phoeniks (Phoenix sp) 75 - 100 dia. Btg 8 Phn
26 Palm phoeniks (Phoenix sp) 150 - 200 dia. Btg 10 Phn
26 Palm putri 50 Phn
27 Palm putri 100-150 dia. Btg 10 Phn
28 Palm putri 150 - 200 dia. Btg 10 Phn
29 Palm pigni (Phoenix canariensis) 100 - 150 dia. Btg 10 Phn
30 Palm raja (Oredoxa regia) 100 - 200 dia. Btg 20 Phn
31 Palm raja (Super oredoxa regia) 200 - 300 dia. Btg 25 Phn
32 Palm ratu 100 - 150 dia. Btg 10 Phn
33 Palm sadeng (Livistonia rotundifolta) 50 dia. Btg 5 Phn
34 Palm saderi (Caroutamiti) 150 dia. Btg 8 Phn
35 Palm seledri tunggal tinggi 150 dia. Btg 8 Phn
36 Palm seledri tunggal putih 200 dia. Btg 8 Phn
37 Palm udang 50 3 s/d 5 btg/rpn Phn
38 Palm waregu (Rhapis excelsa) 150 5 s/d 7 btg/rpn Rmp
39 Pinang sirih (Areca catechu) 200 dia. Btg 10 Phn
X BUNGA POTONG
1 Amarilis (Amarylidaceae) 1 Tangkai
2 Anggrek macan (Arrachnis sp) 1 Tangkai
3 Anyelir 1 Tangkai
4 Apple blossom 1 Tangkai
5 Aster (Asteraceae sp) 1 Tangkai
6 Anggrek Dendrobium 1 Tangkai
7 Gladiol 1 Tangkai
8 Golden shower 1 Tangkai
9 Krisan (Chrysanthemum llini) 1 Tangkai
10 Mawar 1 Tangkai
NO JENIS BAHAN PERTAMANAN UKURAN
TINGGI DIAMETER UNIT
(cm) (cm)
XI TANAMAN TEDUH (INDOOR PLANT)
1 Anggrek bulan 40 -50 3 s/d 5 btg/rpn Polybag
2 Anggrek cathalea 40 -50 3 s/d 5 btg/rpn Polybag
3 Anggrek douglas kecil 40 -50 3 s/d 5 btg/rpn Polybag
NO JENIS BAHAN PERTAMANAN UKURAN
TINGGI DIAMETER UNIT
(cm) (cm)
1 2 3 4 5
4 Apple blossom 30 - 40 Polybag
5 Asparagus 30 - 40 dia. Tajuk 20 Polybag
6 Begonia daun besar 40 -50 dia. Tajuk 20 Polybag
7 Begonia daun Kecil 40 -50 dia. Tajuk 20 Polybag
8 Begonia Hijau 40-50 dia. Tajuk 20 Polybag
9 Begonia perak 40 -50 dia. Tajuk 20 Polybag
10 Belanceng bintik 40 -50 4 s/d 5 dn/pot Polybag
11 Belanceng putih 40 -50 4 s/d 5 dn/pot Polybag
12 Golden shower 50 dia. Tajuk 20 Polybag
13 Gandasari 30 - 40 dia. Tajuk 15 Polybag
14 Hortensia 30 - 40 dia. Tajuk 30 Polybag
15 Kembang kancing 30 - 40 dia. Tajuk 20 Polybag
16 Kencuran 30 - 40 dia. Tajuk 20 Polybag
17 Krisdoren 30 - 40 dia. Tajuk 15 Polybag
18 Kuping gajah 30 - 40 4 s/d 5 dn/pot Polybag
19 Kuping keledai 30 - 40 4 s/d 5 dn/pot Polybag
20 Maranta macan 30 - 40 dia. Tajuk 25 Polybag
21 Maranta batik 30 - 40 dia. Tajuk 25 Polybag
22 Maranta buntut ayam 30 - 40 dia. Tajuk 25 Polybag
23 Maranta keris 30 - 40 dia. Tajuk 25 Polybag
24 Maranta sepat 30 - 40 dia. Tajuk 25 Polybag
25 Meranti bintik 40 -50 dia. Tajuk 20 Polybag
26 Meranti kol 40 -50 dia. Tajuk 20 Polybag
27 Meranti mas koki 40 -50 dia. Tajuk 20 Polybag
28 Meranti pisang 40 -50 dia. Tajuk 20 Polybag
29 Monstera 50 - 75 4 s/d 5 dn/pot Polybag
30 Mutiara 40 -50 dia. Tajuk 20 Polybag
31 Pacing 40 -50 dia. Tajuk 20 Polybag
32 Dona Carmen 40-50 Polybag
33 Sisik Naga 30-40 Polybag
34 Palesota 20-30 Polybag
35 Diefenbachia 30-40 Polybag
36 Chiangmai 20-30 Polybag
37 Chiangmai balon 20-30 Polybag
38 Pilodendron dia. Tajuk 15 Polybag
39 Sabrina ungu 20 - 30 dia. Tajuk 15 Polybag
40 Bambu China 20-30 dia. Tajuk 20 Polybag
41 Sirih Gading 40 -50 dia. Tajuk 20 Polybag
42 Sri rejeki 30 - 40 4 s/d 5 dn/pot Polybag
43 Supelir foster kasar 30 - 40 dia. Tajuk 15 Polybag
44 Supelir halus 30 - 40 dia. Tajuk 15 Polybag
45 Tanduk rusa 40 -50 dia. Tajuk 20 Polybag
46 Walisongo biasa 50 - 100 dia. Btg 2 Polybag
47 Walisongo kuning 100 - 150 dia. Btg 3 Polybag
XII POHON PENEDUH
1 Angsana (Pterocarpus indicus) 100 - 200 dia. Btg 3 Phn
2 Asem Keranji (Pithecelluobium dulce) 150 - 200 dia.Btg 2,5s/d 4 Phn
3 Asem (Tamarindus indica) 150 - 200 dia.Btg 2,5s/d 4 Phn
4 Biola cantik 10 - 25 Phn
5 Bumi 10 - 25 Phn
NO JENIS BAHAN PERTAMANAN UKURAN
TINGGI DIAMETER UNIT
(cm) (cm)
6 Batavia 100 dia. Btg 5 Phn
7 Beringin (Ficus benjamina) 150 - 200 dia.Btg 2,5s/d 4 Phn
8 Beringin (Ficus benjamina) 200 - 300 dia. Btg 4 s/d 5 Phn
9 Beringin putih 200 dia. Btg 3,5 Phn
NO JENIS BAHAN PERTAMANAN UKURAN
TINGGI DIAMETER UNIT
(cm) (cm)
1 2 3 4 5
10 Biola cantik (Ficus pandurata) 150 - 250 dia.Btg 2,5s/d 4 Phn
11 Bisbul (Diospyros discolor) 100 - 200 dia. Btg 3 Phn
12 Bunga kupu-kupu (Bauhunia purpurea) 400 - 500 dia.Btg 8s/d 10 Phn
13 Bunga saputangan(Amherstia nobilis) 0,50-100 dia. Btg 2 Phn
14 Bunga saputangan(Amherstia nobilis) 250-300 dia. Btg 3,5 Phn
16 Bungur (Lagerstromea loudonii) 50-100 Phn
17 Bungur (Lagerstromea loudonii) 100-150 dia. Btg 3,5 Phn
18 Bungur (Lagerstromea loudonii) 150 - 250 dia. Btg 3,5 Phn
19 Cassia golden 50-100 dia. Btg 3 Phn
20 Cassia golden 150-175 dia. Btg 3 Phn
21 Cassia golden 150-200 dia. Btg 3 Phn
22 Cassia sp 200 - 300 dia. Btg 4 s/d 5 Phn
23 Cempaka kuning (Michelia champaca) 300 - 400 dia. Btg 5 s/d 8 Phn
24 Ceremai 400 - 500 dia.Btg 8 s.d 10 Phn
25 Dadap hutan (Erythrina sp) 300 - 400 dia. Btg 5 s/d 8 Phn
26 Dadap kuning (Erythrina veriegata sp) 300 - 400 dia. Btg 5 s/d 8 Phn
27 Dadap kuning (Erythrina veriegata sp) 100 - 200 dia. Btg 5 s/d 8 Phn
28 Dadap merah (Erythrina christagali 150 - 200 dia. Btg 3,5 Phn
29 Dadap merah (Erythrina christagali 300 - 400 dia. Btg 5 s/d 8 Phn
30 Sungkai 50 - 100 Phn
31 Sungkai 150 Phn
31 Damar (Agathis alba) 500 - 700 dia. Btg > 10 Phn
32 Flamboyan (Delonix regia) 150 dia. Btg 2,5 Phn
33 Gemelina 300 dia. Btg 5 Phn
34 Glauka 100 - 150 dia. Btg 3 Phn
33 Glodogan 10 - 25 Phn
34 Glodogan (Polyalthea longifolia) 100-150 dia. Btg 3,5 Phn
35 Glodogan (Polyalthea longifolia) 150 - 200 dia. Btg 3,5 Phn
36 Glodogan (Polyalthea longifolia) 200 - 300 dia. Btg 4 s/d 5 Phn
37 Glodogan tiang (Sarracca sp) 50 Phn
38 Glodogan tiang (Sarracca sp) 150 - 300 dia. Btg 4 Phn
39 Glodogan tiang (Sarracca sp) 400 - 500 dia.Btg 8 s.d 10 Phn
40 Jatimas 200 - 300 dia. Btg 4 s/d 5 Phn
41 Jakaranda (Jacaranda acutifolia) 150 - 200 dia. Btg 3,5 Phn
42 Johar (Cassia siamea) 150 dia. Btg 3 Phn
43 Kamboja putih ( Plumeria rubra) 200 - 300 dia. Btg 4 s/d 5 Phn
44 Kamboja rantai 300 - 400 dia. Btg 5 s/d 8 Phn
45 Karet kebo (Ficus elastica) 100 dia. Btg 3 Phn
46 Kasia bunga kuning (Cassia multijuga) 150 - 200 dia. Btg 3,5 Phn
47 Kastuba (Euphorbia pulcherrima) 200 - 300 dia. Btg 4 s/d 5 Phn
48 Kayu manis (Cinnamon bumanni) 200 dia. Btg 3,5 Phn
49 Kayu manis (Cinnamon bumanni) 400 - 600 dia. Btg 8s.d10 Phn
50 Kayu putih (Maleucaa leucadendron) 200 - 300 dia. Btg 4 s/d 5 Phn
51 Kembang kupu-kupu (Bauhinia pupurea) 100-150 dia. Btg 3,5 Phn
52 Kembang kupu-kupu (Bauhinia pupurea) 150 - 200 dia. Btg 3,5 Phn
53 Kembang merak (Caesalpina pulcherrima) 100-150 dia. Btg 3 Phn
54 Kembang merak (Caesalpina pulcherrima) 200 dia. Btg 3 Phn
55 Kembang sepatu kuning (Hibiscus hybridus) 100 - 200 dia. Btg 3,5 Phn
56 Kenari (Canarium commune) 100 - 150 dia. Btg 3 Phn
57 Kenari (Canarium commune) 300 - 400 dia. Btg 5 s/d 8 Phn
NO JENIS BAHAN PERTAMANAN UKURAN
TINGGI DIAMETER UNIT
(cm) (cm)
58 Ketapang (Terminalia catappa) 150 - 200 dia. Btg 3,5 Phn
59 Ketapang (Terminalia catappa) 500 - 600 dia. Btg > 10 Phn
60 Kepuh 300 - 400 dia. Btg 5 s/d 8 Phn
61 Kiara payung (Filicium decipiens) 150 - 200 dia. Btg 3,5 Phn
NO JENIS BAHAN PERTAMANAN UKURAN
TINGGI DIAMETER UNIT
(cm) (cm)
1 2 3 4 5
62 Pucuk Merah Phn
63 Kurma 50 dia. Btg 3 Phn
64 Lampeni 150 - 200 dia. Btg 3,5 Phn
65 Mahoni (Swietania mahagoni) 20-40 dia. Btg 2 s/d 3 Phn
66 Mahoni (Swietania mahagoni) 30-50 dia. Btg 5 s/d 8 Phn
67 Mahoni (Swietania mahagoni) 50-75 dia. Btg 5 s/d 8 Phn
68 Mahoni diameter (Swietania mahagoni) 200 - 300 dia. Btg 4 s/d 5 Phn
69 Mangga (Mangifera indica) 500 - 800 dia. Btg > 10 Phn
70 Mangga Mardi Malaysia Phn
71 Sawo manila Phn
72 Jeruk Sambal calung Phn
73 Lengkeng Diamond Phn
74 Kedondong bangkok Phn
75 jambu Air bangkok Phn
76 jambu Batu Merah Phn
77 Matoa irian (Pometia pinata) 300 - 400 dia. Btg 5 s/d 8 Phn
78 Pucuk Merah 75-100 dia. Btg 5 s/d 8 Phn
79 Pule (Alsonia scholaris) 600 - 700 dia. Btg > 10 Phn
80 Salam 50 - 100 dia. Btg 3 Phn
81 Salam 10 - 25 Phn
82 Sikat botol 200 - 300 dia. Btg 4 s/d 5 Phn
83 Santorium 500 - 600 dia. Btg > 10 Phn
84 Sawo duren (Chrysophillium cainito) 150 - 200 dia. Btg 3,5 Phn
85 Sawo kecik (Chrysophillium sp) 200 dia. Btg 3,5 Phn
86 Sono keling/Sengon (Abaziafalcata) 150 - 200 dia. Btg 3,5 Phn
87 Spathodea campanulata 150 - 200 dia. Btg 3,5 Phn
88 Spathodea campanulata 500 - 600 dia. Btg > 10 Phn
89 Tabebuia 100 - 200 dia. Tajuk 50 - 70 Phn
90 Tanjung (Mimusops elengi) 10 - 25 Phn
91 Tanjung (Mimusops elengi) 60 -100 Phn
92 Tanjung (Mimusops elengi) 100-150 Phn
93 Tanjung (Mimusops elengi) 150-200 dia. Btg 3,5 Phn
94 Tanjung (Mimusops elengi) 200-250 dia. Btg 5 s/d 7 Phn
95 Tanjung (Mimusops elengi) 200 - 300 dia. Btg 4 s/d 5 Phn
96 Sirsak Madu 150 -200 dia. Btg 3,5 Phn
97 Melinjo 150 - 200 dia. Btg 3,5 Phn
98 Mahkota Dewa 150 - 200 dia. Btg 3,5 Phn
99 Trembesi (Samanea saman) 10 - 25 Phn
100 Trembesi (Samanea saman) 200 dia. Btg 3,5 Phn
101 Trembesi (Samanea saman) 400 - 500 dia. Btg 8s.d 10 Phn
102 Trembesi (Samanea saman) 600 - 700 dia. Btg > 10 Phn
103 Trenggulin (Cassia fistula) 50 - 150 dia. Btg 3 Phn
104 Walisongo (Alithurium macrolobium) 50 - 100 dia. Btg 3 Phn
104 Walisongo (Alithurium macrolobium) 200 dia. Btg 3,5 Phn
105 Walisongo (Alithurium macrolobium) 300 dia. Btg 5 Phn
106 Waru (Hibiscus tiliaceus) 500 - 600 dia. Btg > 10 Phn
107 Yangliu (Salyx babylonia) 150 - 200 dia. Btg 3,5 Phn
XIII BIJI
1 Bixa (Bixaceae sp) 1 Kg
2 Bunga kupu-kupu (Bauhunia pupurea) 1 Kg
NO JENIS BAHAN PERTAMANAN UKURAN
TINGGI DIAMETER UNIT
(cm) (cm)
3 Bungur (Largerstroemia loudonii) 1 Kg
4 Buni (Antidesma bunius) 1 Kg
5 Glodogan (Polyalthea longifolia) 1 Kg
6 Mahoni (Swietenia mahagoni) 1 Kg
NO JENIS BAHAN PERTAMANAN UKURAN
TINGGI DIAMETER UNIT
(cm) (cm)
1 2 3 4 5
7 Salam (Eugenia Polyanthum) 1 Kg
8 Tanjung (Mimusops elengi) 1 Kg
9 Trembesi (Samanea saman) 1 Kg
TERTANDA
PARYADI, S.Hut
TENTANG
TAR HARGA SATUAN TANAMAN HIAS
DI KOTA PONTIANAK TAHUN 2010
HARGA BAHAN
9,000
31,000
10,250
9,000
5,000
8,000
2,000
3,000
3,000
4,500
12,017
5,000
11,000
10,000
17,500
3,500
6,000
6,000
6,000
7,000
3,250
3,250
1,000
3,250
5,000
10,658
3,500
3,250
4,500
12,000
17,500
20,000
3,250
4,500
HARGA BAHAN
7,500
11,996
1,500
2,500
2,500
5,000
4,750
6,250
HARGA BAHAN
6
6,750
5,250
10,000
2,000
3,250
6,000
10,500
4,000
1,500
55,000
37,500
30,000
40,000
125,000
150,000
50,000
20,000
17,500
22,500
15,000
12,500
5,000
11,000
25,000
145,000
27,500
100,000
90,000
10,000
35,000
27,500
22,500
5,000
5,000
22,500
22,500
22,500
11,000
8,500
35,000
37,500
1,500
2,250
15,000
40,000
92,500
20,000
HARGA BAHAN
6,500
4,000
4,000
4,000
HARGA BAHAN
4,000
5,000
6,000
52,500
3,500
1,500
2,500
2,000
6,500
5,050
6,000
7,500
6,000
5,750
6,500
15,000
4,950
3,650
5,000
6,000
8,750
35,000
17,500
15,000
15,000
13,500
23,500
30,000
1,008
40,000
47,500
12,500
15,000
50,000
35,000
40,000
40,000
7,500
20,000
10,000
30,000
15,000
2,500
HARGA BAHAN
10,000
11,000
12,500
HARGA BAHAN
6
8,000
11,000
15,000
13,500
25,000
5,500
225,000
375,000
1,000,000
2,500,000
20,000
30,000
10,000
12,500
200,000
475,000
20,000
20,000
20,000
14,500
30,000
20,000
20,000
7,500
100,000
900,000
1,000,000
1,350,000
125,000
400,000
300,000
40,000
15,000
450,000
450,000
175,000
400,000
3,500,000
400,000
150,000
125,000
300,000
110,000
300,000
45,000
225,000
110,000
250,000
HARGA BAHAN
65,000
42,500
125,000
40,000
HARGA BAHAN
6
60,000
70,000
110,000
325,000
175,000
375,000
45,000
140,000
300,000
8,000,000
150,000
425,000
80,000
62,500
70,000
150,000
400,000
35,000
50,000
250,000
45,000
75,000
67,500
235,000
200,000
50,000
75,000
150,000
550,000
52,500
150,000
62,500
62,500
150,000
1,250,000
75,000
77,500
275,000
400,000
275,000
57,500
20,000
40,000
70,000
80,000
250,000
HARGA BAHAN
35,000
75,000
175,000
90,000
HARGA BAHAN
6
40,000
61,750
300,000
175,000
50,000
40,000
65,000
44,000
99,000
341,000
77,000
165,000
33,000
52,250
38,500
132,000
88,000
137,500
164,340
27,500
16,500
38,500
110,000
99,000
38,500
93,500
121,000
170,500
165,000
22,000
33,000
38,500
66,000
220,000
66,000
165,000
99,000
17,875
275,000
13,750
11,000
15,125
68,750
13,750
55,000
16,500
5,500
HARGA BAHAN
110,000
82,500
25,850
HARGA BAHAN
6
55,000
22,000
24,750
24,750
24,750
23,100
165,000
22,000
44,000
22,000
33,000
11,000
11,000
16,500
38,500
49,500
24,750
22,000
27,500
22,000
22,000
22,000
22,000
22,000
22,000
11,000
5,500
5,500
41,250
55,000
60,500
82,500
44,000
96,750
8,250
5,500
16,500
16,500
22,000
27,500
27,500
44,000
44,000
137,500
100,100
324,500
143,000
35,750
10,100
HARGA BAHAN
71,500
393,250
572,000
1,430,000
HARGA BAHAN
6
286,000
28,600
429,000
154,200
171,600
71,500
180,753
214,500
57,475
57,600
78,650
85,800
128,700
321,750
250,250
286,000
143,000
250,250
572,000
67,100
357,500
643,500
143,000
128,700
50,050
7,150
151,250
178,750
286,000
14,300
178,750
321,750
286,000
50,050
107,250
286,000
1,144,000
35,750
171,600
357,500
100,100
193,050
85,800
121,000
181,500
90,750
181,500
214,500
71,500
171,600
HARGA BAHAN
321,750
643,500
100,100
143,000
HARGA BAHAN
6
80,000
214,500
78,650
101,875
121,000
143,000
214,500
2,145,000
178,750
178,750
28,600
89,375
117,975
107,250
46,475
1,101,100
137,500
572,000
71,500
42,900
357,500
572,000
250,250
357,500
85,800
57,200
643,500
15,250
17,875
66,000
79,860
95,835
181,500
286,000
89,375
121,550
143,000
58,650
135,850
217,950
500,500
42,900
107,250
321,750
500,500
500,500
214,500
44,000
33,000
HARGA BAHAN
22,000
44,000
44,000
11,000
HARGA BAHAN
6
22,000
16,500
33,000
247,500
55,000
1,100,000
1,237,500
1,045,000
2,475,000
1,375,000
38,500
38,500
143,000
44,000
44,000
44,000
165,000
330,000
495,000
495,000
176,000
22,000
55,000
220,000
13,750
1,320,000
66,000
46,750
88,000
137,500
121,000
TERTANDA
PARYADI, S.Hut
NO URAIAN SATUAN
A. UPAH
1 Mandor Lapangan Org/hari
2 Kepala Tukang Org/hari
3 Tukang Org/hari
4 Pekerja Org/hari
B. BAHAN/MATERIAL
1 Batu pecah 1-2 cm M³
2 Pasir M³
3 Semen PC Zak
4 Semen PC Kg
5 Bataco 7 x 15 x 30 cm Bh
6 Keramik 20 x 20 cm Kotak
7 Keramik 40 x 40 cm Polished (setaraf Decogress) Kotak
8 Keramik dinding 20 x 25 cm Kotak
9 Tiang Pancang (Mini Pile / Ready Mix) uk. Δ 32 x 32 x 32, K 300 - 6m Btg
10 Rangka Baja Ringan Zincalume (truss/color) (Dengan Jurai Dalam - Bentang s/d M²
11 Pemancangan Mini Pile - 6m Btg
12 Bahan Plastik Cor Beton M²
13 Ky. klas I uk. 5/10 - 4 M ( ketam / untuk kusen ) M³
14 Ky. klas II uk. 4/6 - 4 M ( tdk ketam ) M³
15 Ky klas III uk. 4/6 - 4 M ( tdk ketam) M³
16 Papan kayu klas II ( tdk ketam ) M³
17 Papan mal klas III M³
18 Kayu cerucuk /dolken ø 6 - 8 cm Pj. 4 M Btg
19 Kayu Bulat ø 12 - 15 cm Pj.12 M Btg
20 Cat kilat Kg
21 Cat dasar Kg
22 Cat tembok Kg
23 Dempul Kg
24 Meni Kg
25 Oker Kg
26 Lem Kayu Kg
27 Besi Tulangan Beton Kg
28 Besi wire mesh ø 5 Kg
29 Kawat baja/bendrat Kg
30 Engsel pintu Bh
31 Slot pintu Bh
32 Kunci tanam besar Bh
33 Paku campuran 1" - 5 " Kg
34 Paku GRC Kg
35 Seng Metal Lbr
36 Seng Gelombang Bjls 0.30 Lbr
37 Seng Plat Bjls 0.20 Lbr
38 Kaca Polos, t = 5 mm M²
39 Triplek t = 3 mm Lbr
40 Triplek t =9 mm Lbr
41 Panel GRC 120 x 240 x 40 Lbr
42 Kloset duduk monoblok Bh
43 Kran air uk 1/2" Bh
44 Pipa paralon dia 3/4" - 4 M Btg
45 Pipa paralon dia 2" - 4 M Btg
46 Pipa paralon dia 4" - 4 M Btg
47 Minyak solar Ltr
SATUAN UPAH DAN BAHAN
HARGA
(Rp)
105,000.00
105,000.00
95,000.00
75,000.00
457,800.00
92,700.00
79,300.00
1,586.00
1,100.00
81,100.00
156,200.00
99,400.00
1,035,000.00
247,500.00
145,500.00
3,500.00
9,315,000.00
3,363,100.00
1,991,500.00
7,187,500.00
2,430,100.00
7,000.00
104,900.00
60,200.00
36,800.00
14,900.00
17,500.00
43,100.00
13,700.00
19,700.00
13,500.00
16,800.00
21,300.00
21,100.00
19,600.00
186,900.00
22,900.00
23,900.00
61,000.00
73,200.00
46,200.00
162,900.00
63,200.00
196,300.00
78,600.00
1,092,500.00
29,800.00
26,500.00
76,500.00
215,800.00
6,500.00
LAMPIRAN II : PERATURAN WALIKOTA PONTIANAK
NOMOR : …………………... TAHUN 2014
TANGGAL : ……………-…………2014
TENTANG
STANDAR HARGA SATUAN UPAH, BAHA
ANALISA BIAYA KONSTRUKSI STANDAR NASIONAL IND
DAN ANALISA E KOTA PONTIANAK
A. UPAH
1 Mandor Lapangan Org/hari L.061
2 Mekanik Org/hari L.071
3 Kepala Tukang Org/hari L.073
4 Tukang Batu / Kayu / GaOrg/hari L.079
5 Operator terlatih Org/hari L.081
6 Operator semi terlatih Org/hari L.082
7 Sopir Org/hari L.091
8 Pekerja / Buruh Lapang Org/hari L.101
9 Pekerja / Buruh Lapang Org/hari L.106
NO
MATERIAL
B. BAHAN PENGISI
1 Batu Kong
2 Batu Sap Pinang
3 Batu pecah 15-20 cm
4 Batu pecah 10-15 cm
5 Batu pecah 5-7 cm
6 Batu pecah 3-5 cm
7 Batu pecah 2-3 cm
8 Batu pecah 1-2 cm
9 Batu pecah 1-1 cm
10 Batu pecah 0,5 cm
11 Stone Dust
12 Aspal
13 Pasir
14 Semen PC
15 Semen PC
16 Tanah Ex. Peniraman
17 Tanah EX. Peladis
18 Paving Block
19 Paving Stone
20 Paving Segi Enam
21 Batu Bata 5 x 11 x 22cm
22 Bataco 15 x 30 x 7 cm
23 Bataco 15 x 30 x 6 cm
24 Bataco 20 x 40 x 9 cm ( press )
25 Bataco 20 x 40 x 7 cm ( press )
26 Kerawang ( roster ) 18 x 18 cm
27 Kerawang press ( roster ) 30 x 30 cm
28 Keramik 20 x 20 cm ex Roman
29 Keramik 30 x 30 cm ex Roman
30 Keramik 30 x 30 cm Unpolished
31 Keramik 30 x 30 cm Polish
32 Keramik 30 x 30 cm Artistik
33 Keramik 40 x 40 cm ex Roman
34 Keramik 40 x 40 cm Polished (setaraf Indogress)
35 Keramik 40 x 40 cm Polished (setaraf Decogress)
36 Keramik 40 x 40 cm Unpolished (setaraf Indogress)
37 Keramik 40 x 40 cm Unpolished (setaraf Decogress)
38 Keramik 60 x 60 cm Polished (setaraf Indogress)
39 Keramik 60 x 60 cm Polished (setaraf Decogress)
40 Keramik 60 x 60 cm Unpolished (setaraf Indogress)
41 Keramik 60 x 60 cm Unpolished (setaraf Decogress)
42 Granit 60 x 60 cm ex Essenza Polished
43 Granit 60 x 60 cm ex Essenza Unpolished
44 Granit 40 x 40 cm ex Essenza Polished
45 Granit 40 x 40 cm ex Essenza Unpolished
46 Marmer
47 Wood Flooring
48 List Keramik WC. 8 x 20 cm
49 Plint Kayu uk. 2 x 10 cm
50 Keramik dinding 20 x 20 cm ex Roman
51 Keramik dinding 20 x 25 cm ex Roman
52 Floor Hardener
53 Beton Ready Mix B 0
54 Beton Ready Mix 125
55 Beton Ready Mix 150
56 Beton Ready Mix 175
57 Beton Ready Mix 200
58 Beton Ready Mix 225
59 Beton Ready Mix 250
60 Beton Ready Mix 275
61 Beton Ready Mix 300
62 Beton Ready Mix 325
63 Beton Ready Mix 350
64 Beton Ready Mix 375
65 Beton Ready Mix 400
66 Beton Ready Mix 425
67 Beton Ready Mix 450
68 Beton Ready Mix 475
69 Beton Ready Mix 500
70 Additive Ready Mix
71 Karung Goni Curing Beton ( 0.7m² )
72 Tiang Pancang (Mini Pile / Ready Mix) uk. Π 20 x 20, K 300 - 6m
73 Tiang Pancang (Mini Pile / Ready Mix) uk. Π 25 x 25, K 300 - 6m
74 Tiang Pancang (Mini Pile / Ready Mix) uk. Δ 28 x 28 x 28, K 300 - 6m
75 Tiang Pancang (Mini Pile / Ready Mix) uk. Δ 32 x 32 x 32, K 300 - 6m
76 Pemancangan Mini Pile - 6m
77 Sewa Pompa Ready Mix (Min. 100 M³)
78 Bahan Plastik Cor Beton
79 Kansteen / kerb beton 60x30x20
80 Kansteen / kerb beton 60x30x10
C. BAHAN KAYU
1 Ky. Belian tdk ketam Uk. 6/6 - 4 M
2 Ky. Belian tdk ketam Uk. 7/7 - 4 M
3 Ky. Belian tdk ketam Uk. 8/8 - 4 M
4 Ky. Belian tdk ketam Uk. 8/16 - 4 M
5 Ky. Belian tdk ketam Uk. 9/9 - 4 M
6 Ky. Belian tdk ketam Uk. 10/10 - 4 M
7 Ky. Belian tdk ketam Uk. 12/12 - 4 M
8 Ky. Belian tdk ketam Uk. 18/18 - 4 M
9 Ky. Belian tdk ketam Uk. 5/10 - 4 M
10 Ky. Belian ketam Uk. 6/6 -4M
11 Ky. Belian ketam Uk. 7/7 -4M
12 Ky. Belian ketam Uk. 8/8 -4M
13 Ky. Belian ketam Uk. 5/10 - 4 M
14 Ky. Belian ketam Uk. 4/8 - 4 M
15 Papan belian ketam (4m)
16 Papan belian tdk ketam (4m)
17 Ky. klas I Bengkirai uk. 8/8 - 4 M ( ketam )
18 Ky. klas I Bengkirai uk. 8/8 - 4 M ( tdk ketam )
19 Ky. klas I Bengkirai uk. 7/7 - 4 M ( tdk ketam )
20 Ky. klas I Bengkirai uk. 7/7 - 4 M ( ketam )
21 Ky. klas I Bengkirai uk. 5/10 - 4 M ( ketam / untuk kusen )
22 Kusen Ky Belian uk. 5/10
23 Kusen Ky Kelas I Bangkirai uk. 5/10
24 Kusen Ky Kelas II uk. 5/11
25 Ky. klas II Mabang uk. 8/8 - 4 M ( tdk ketam )
26 Ky. klas II Mabang uk. 8/8 - 4 M ( ketam )
27 Ky. klas II Mabang uk. 7/7 - 4 M ( tdk ketam )
28 Ky. klas II Mabang uk. 7/7 - 4 M ( ketam )
29 Ky. klas II Mabang uk. 4/6 - 4 M ( tdk ketam )
30 Ky. klas II Mabang uk. 5/7 - 4 M ( tdk ketam )
31 Ky. klas II Mabang uk. 5/10 - 4 M ( tdk ketam )
32 Ky. klas II Mabang uk. 6/10 - 4 M ( tdk ketam )
33 Ky. klas II Mabang uk. 6/12 - 4 M ( tdk ketam )
34 Ky. klas II Mabang uk. 4/8 - 4 M ( tdk ketam )
35 Ky. klas II Mabang uk. 8/15 - 4 M ( tdk ketam )
36 Ky. klas II Mabang uk. 8/12 - 4 M ( tdk ketam )
37 Ky klas III uk. 3/5 - 4 M ( tdk ketam)
38 Ky klas III uk. 4/6 - 4 M ( tdk ketam)
39 Papan kayu klas II (mabang) tdk ketam
40 Papan kayu klas II (mabang) ketam
41 Papan kayu klas I tdk ketam
42 Papan kayu klas I ketam
43 Papan mal klas III
44 Papan Simpiran
45 Renglat kayu klas I uk 1/8 cm
46 Kayu profil 10cm
47 Kayu cerucuk /dolken ø 4 - 6 - Pj. 4 M
48 Kayu cerucuk /dolken ø 6 - 8 - Pj. 4 M
49 Kayu cerucuk /dolken ø 8 - 10 - Pj. 4 M
50 Kayu cerucuk /dolken ø12 - Pj. 8 M
51 Kayu cerucuk /dolken ø 15 - Pj. 12 M
52 Kayu Simpiran / Bakar
53 Alas laci
54 Wood Plank
55 Bambu Pj. 10 m
D. BAHAN CAT
1 Amplas
2 Minyak cat
3 Cat kilat
4 Plamur
5 Cat dasar
6 Cat tembok
7 Cat tembok type weather shield
8 Cat tembok type weather coat (acrylic)
9 Cat Dasar Emulsion Setara Dulux
10 Cat Akhir Emulsion setara Dulux
11 Cat Akhir Weather Shield setara Dulux
12 Cat Dasar Emulsion setara Mowilex
13 Cat Akhir Emulsion setara Mowilex
14 Cat Weather Shield setara Mowilex
15 Cat Dasar Emulsion setara Vinilex
16 Cat Akhir Emulsion setara Vinilex
17 Cat Weather Shield setara Vinilex
18 Cat Alkali (Undercoat)
19 Cat seng (Zinc Chromate)
20 Dempul
21 Plitur
22 Thiner
23 Thiner ND
24 Melamic
25 Vernis
26 Meni
27 Oker
28 Lem Kayu
29 Sealent
30 Soda Api
31 Sabun / cream pembersih kotoran
32 Teak Oil
33 Ter / Residu
34 Kuas 4"
35 Road Line Paint ( Cat Marka )
36 Glass Bit
37 Weatherbond Emulsion ( cat kerb )
38 Termoplast
39 Water Proofing
F. BAHAN PENGANTUNG
1 Pintu Plastik untuk WC
2 Kait angin
3 Handle Jendela
4 Handle Pintu
5 Engsel jendela
6 Engsel pintu
7 Slot pintu
8 Slot jendela
9 Kunci tanam 2 slag (setaraf Belluci)
10 Kunci tanam 1 slag
11 Kunci tanam antik
12 Kunci tanam biasa
13 Kunci silinder
14 Door Closer
15 Door Stoper
16 Paku Seng
17 Paku campuran 1" - 5 "
18 Paku beton
19 Paku triplek
20 Paku GRC
21 Paku Zincalum
22 Paku Onduline
23 Sekrup Onduline
24 Sekrup Gibsum
25 Sekrup Fixer
26 Sekrup Steel Sheet
27 Sekrup Zincalume
28 Pintu Tempered Polos 12 mm - uk. 87 x 213,5 cm
29 Pintu Alumunium + Engsel Tanam - uk. 90 x 215 cm
30 Pintu Alumunium + Engsel Kupu-kupu - uk. 90 x 215 cm
31 Jendela Casement - uk. 60 x 120 cm (Lengkap - Tanpa Kaca)
G. BAHAN ATAP
1 Sirap belian
2 Asbes
3 Eternit
4 Genteng Metal Type Permata 0.35
5 Genteng Metal Type Prima 0.35
6 Genteng Metal Type Royal 0.35
7 Genteng Metal Type Classic 0.35
8 Genteng Metal Type Permata 0.25
9 Genteng Metal Type Classic 0.25
10 Genteng Metal Type Royal 0.26
11 Atap Genteng Onduline Transparan 2 x 0,95 m
12 Atap Genteng Onduline Warna 2 x 0,95 m (merah,hijau,coklat & hitam)
13 Atap Genteng Onduline Warna 2 x 0,95 m (Biru /Premium)
14 Atap Genteng Onduvilla Warna 1,06 x 0,4 m (merah,hijau,coklat & hitam)
15 Atap Genteng Onduvilla Warna 1,06 x 0,4 m (teracota 3D & florentino)
16 Perabung Onduline Warna 90 x 50 cm (merah, coklat, hijau & hitam)
17 Perabung Onduline Warna 90 x 50 cm (biru/premium)
18 Perabung Onduline Warna 90 x 50 cm (florentino)
19 Siku Onduline Warna 110 x 40 cm (merah,coklat,hijau & hitam)
20 Apron Piece Onduvilla 102 x 14 cm
21 Verge Piece Onduline/Onduvilla 104 x 10,5 cm tinggi 11,4 cm
22 Onduband
23 Atap Seng Metal Soka Abadi
24 Atap Seng Metal Soka Jempol
25 Atap Seng Metal Soka Tiara
26 Genteng Metal Stone ( Type Classic 0.35 )
27 Genteng Metal Stone ( Type Prima 0.35 )
28 Atap Metal Supersheet 0.35 (polos)
29 Atap Metal Supersheet 0.35 (colour)
30 Atap Metal Supersheet 0.25 (polos)
31 Atap Metal Supersheet 0.25 (colour)
32 Atap Trim Deck 0.3 (polos)
33 Atap Trim Deck 0.35 (color)
34 Atap polycarbonat
35 Nok bubungan genteng metal 1/2 lingkaran 0.35 (pj 40cm)
36 Nok bubungan genteng metal stone 1/2 lingkaran 0.35 (pj 40cm)
37 Nok bubungan genteng metal kotak 0.35
38 Nok bubungan genteng metal stone kotak 0.35
39 Nok bubungan Trim Deck (polos)
40 Nok bubungan Trim Deck (color)
41 Nok bubungan Steel Sheet 0.33 (color) (pj 50 cm)
42 Nok bubungan Steel Sheet 0.43 (color) (pj 50 cm)
43 Nok bubungan Steel Sheet 0.35 (polos) (pj 50 cm)
44 Nok bubungan Steel Sheet 0.40 (polos) (pj 50 cm)
45 Seng Gelombang Bjls 30
46 Seng Gelombang Bjls 20
47 Seng Plat Bjls 20
48 Seng Plat Bjls 30
49 Seng Plat Bjls 30 (lebar 45 cm)
50 Plat Datar Color 0.35
51 Zincalume Gelombang Persegi 0.40 (polos)
52 Zincalume Gelombang Persegi 0.35 (polos)
53 Zincalume Gelombang Persegi 0.30 (polos)
54 Zincalume Gelombang Persegi 0.40(color)
55 Zincalume Gelombang Persegi 0.35 (color)
56 Zincalume Gelombang Persegi 0.30 (color)
57 Zincalume Plat 0.2
58 Aluminium Foil
59 Atap Steel Sheet 0.33 (color)
60 Atap Steel Sheet 0.40 (polos)
61 Papan Belian utk Atap uk. 1/15 pj. 50 cm
62 Atap Gelombang Bitumen Warna
63 Atap Gelombang Bitumen Bening
H. BAHAN KACA
1 Kaca Polos, t = 5 mm
2 Kaca Polos, t = 12mm
3 Kaca Rayben, t = 5 mm
4 Kaca Cermin t = 3mm
5 Kaca Repsol, t=5mm
6 Kaca Patri
7 Sealent
8 Nako + Bingkai (80 x 15) x 10 daun polos
9 Nako + Bingkai (80 x 15) x 10 daun rayben
10 Kaca Es
11 Kaca Polos, t = 8 mm
12 Kaca Raindown, t = 5 mm
13 Kaca Buram, t = 5 mm
I. BAHAN TRIPLEK
1 Triplek t = 3 mm
2 Triplek t = 6 mm
3 Triplek t =9 mm
4 Triplex t = 12 mm
5 Teakwood t = 3 mm
6 Formika t = 0,03 mm
7 Multiplex t = 6 mm
8 Multiplex t = 9 mm
9 Multiplex t = 10 mm
10 Multiplek t = 12 mm
11 Plywood 4' x 8' x 4mm
12 Panel GRC 120 x 240 x 40
13 GypsumBoard t = 9mm
14 Super Plank 10 x 240 x 9 cm
15 Super Plank 20 x 240 x 9 cm
16 Super Plank 30 x 240 x 9 cm
J. BAHAN SANITASI
1 Wastafel setara Toto
2 Kloset duduk monoblok
3 Kloset duduk putih (setaraf TOTO)
4 Kloset duduk warna (setaraf TOTO)
5 Kloset jongkok (setaraf TOTO)
6 Kloset jongkok (setaraf INA)
7 Urinoir type U 57 M ex Toto
8 Bak air fibreglass uk. 55x55x60 cm
9 Shower Spray setara Toto
10 Sliding rail setara Toto
11 Floordrain setara Toto
12 Tempat Sabun Setara Toto
13 Kran zink setara Toto
14 Kitchenzink stainless steel 1 lubang
15 Kran dinding setara Toto
16 Kaca Cermin
17 Kran air uk 1/2"
18 Pipa paralon dia 1/2"
19 Pipa paralon dia 3/4"
20 Pipa paralon dia 1"
21 Pipa paralon dia 2"
22 Pipa paralon dia 3"
23 Pipa paralon dia 4"
24 Pipa paralon dia 8"
25 Pipa PVC dia 1/2" AW ex Wavin
26 Pipa PVC dia 3/4" AW ex Wavin
27 Pipa PVC dia 1" AW ex Wavin
28 Pipa PVC dia 2" AW ex Wavin
29 Pipa PVC dia 3" AW ex Wavin
30 Pipa PVC dia 4" AW ex Wavin
31 Pipa PVC dia 3/4" D ex Wavin
32 Pipa PVC dia 1" D ex Wavin
33 Pipa PVC dia 2" D ex Wavin
34 Pipa PVC dia 3" D ex Wavin
35 Pipa PVC dia 4" D ex Wavin
36 Stop kran dia 1/2" ex onda
37 Stop kran dia 3/4" ex onda
38 Stop kran dia 1" ex onda
39 Tangki air 1000 liter
40 Tangki air 500 liter
41 Pelampung otomatis
42 Roof Drain Metal
43 Septicktank Biosel kap. 6,00 m3
44 Mesin Jet Pump kap.250 watt
45 Mesin Pompa tekan kap. 150 watt
L. BATU ALAM
1 Batu Andesit Ukuran 10 x 20 cm
2 Batu Andesit Ukuran 15 x 30 cm
3 Batu Andesit Ukuran 20 x 40 cm
4 Batu Andesit Ukuran 30 x 60 cm
5 Batu Candi Ukuran 10 x 20 cm
6 Batu Candi Ukuran 15 x 30 cm
7 Batu Candi Ukuran 20 x 40 cm
8 Batu Pacitoroso Ukuran 10 x 20 cm
9 Batu Pacitoroso Ukuran 15 x 30 cm
10 Batu Pacitoroso Ukuran 20 x 40 cm
11 Batu Bali Green Ukuran 10 x 20 cm
12 Batu Bali Green Ukuran 15 x 30 cm
13 Batu Bali Green Ukuran 20 x 40 cm
14 Batu Prasasti Peresmian (batu hitam) ukuran 40 x 60
15 Batu Prasasti Peresmian (batu hitam) ukuran 60 x 80
16 Batu Koral (batu taman)
17 Batu Granit Ukuran Lebar 60 cm
Desember 2014 )
HARGA
HARGA TERMASUK
SATUAN KODE KEUNTUNGAN
(OVERHEAD)
(Rp)
M³ M.101 210,800.00
M³ - 230,000.00
M³ - 354,600.00
M³ M.020 383,300.00
M³ M.022 402,500.00
M³ M.023 413,800.00
M³ M.024 449,900.00
M³ M.025 457,800.00
M³ - 493,500.00
M³ M.026 569,400.00
M³ - 408,600.00
Kg - 13,900.00
M³ M.040 92,700.00
Zak M.080 79,300.00
Kg - 1,586.00
M³ M.050.a 219,900.00
M³ M.050 284,800.00
Bh - 2,500.00
Bh - 4,600.00
Bh 4,000.00
Bh - 1,700.00
Bh - 1,100.00
900.00
Bh - 2,900.00
Bh - 2,400.00
Bh - 13,800.00
Bh - 61,800.00
Kotak - 81,100.00
Kotak - 95,200.00
Kotak - 98,500.00
103,500.00
Kotak - 107,000.00
Kotak - 109,300.00
Kotak - 257,300.00
Kotak - 156,200.00
Kotak - 256,500.00
Kotak - 162,900.00
Kotak - 367,400.00
Kotak - 360,000.00
Kotak 371,500.00
Kotak 333,500.00
Kotak 326,600.00
Kotak 333,500.00
Kotak 256,500.00
Kotak - 264,500.00
M² - 977,500.00
M² - 301,900.00
Bh - 9,600.00
Bh - 60,500.00
Kotak - 87,400.00
Kotak - 99,400.00
Kg - 11,000.00
M³ - 1,085,600.00
M³ 1,140,000.00
M³ 1,178,800.00
M³ 1,218,200.00
M³ 1,304,100.00
M³ 1,367,700.00
M³ 1,408,800.00
M³ 1,426,000.00
M³ 1,456,700.00
M³ 1,502,500.00
M³ 1,542,700.00
M³ 1,584,100.00
M³ 1,617,500.00
M³ - 1,647,400.00
M³ - 1,687,600.00
M³ - 1,729,600.00
M³ - 1,767,000.00
Liter - 44,000.00
Lembar - 13,000.00
Btg - 1,104,000.00
Btg - 1,380,000.00
Btg - 897,000.00
Btg - 1,035,000.00
Btg - 145,500.00
M³ - 28,800.00
M² - 3,500.00
bh 74,800.00
bh 66,000.00
M³ - 11,663,900.00
M³ - 10,883,400.00
M³ - 9,126,500.00
M³ - 8,759,800.00
M³ M.181.a 11,003,100.00
M³ M.181.b 10,823,800.00
M³ - 14,974,000.00
M³ - 11,979,200.00
M³ - 11,500,000.00
M³ - 12,827,700.00
M³ - 11,558,700.00
M³ - 12,668,000.00
M³ - 12,567,900.00
M³ - 11,629,800.00
M³ M.181.e 15,240,200.00
M³ M.181.d 14,584,700.00
M³ M.181.f 7,704,100.00
M³ M.181.g 7,487,000.00
M³ - 6,011,700.00
M³ - 6,600,800.00
M³ - 9,315,000.00
22,425,000.00
M³ - 17,250,000.00
13,225,000.00
M³ M.181.h 4,402,300.00
M³ M.181.i 4,567,100.00
M³ - 4,540,200.00
M³ - 4,776,800.00
M³ - 3,363,100.00
M³ - 3,605,200.00
M³ - 4,358,100.00
M³ - 4,671,900.00
M³ - 4,458,900.00
M³ - 4,528,500.00
M³ - 4,592,000.00
M³ - 4,342,400.00
M³ - 2,389,400.00
M³ - 1,991,500.00
M³ M.181.j 7,187,500.00
M³ M.181.k 7,240,700.00
M³ - 12,442,800.00
M³ - 12,866,500.00
M³ M.181.l 2,430,100.00
M³ - 1,197,900.00
Btg - 19,600.00
Btg - 35,300.00
Btg - 5,800.00
Btg - 7,000.00
Btg - 8,900.00
Btg - 86,300.00
Btg - 104,900.00
M³ - 268,300.00
Btg - 8,500.00
M' - 60,500.00
Btg 8,600.00
Lbr - 3,200.00
Kg - 17,000.00
Kg - 60,200.00
Kg - 36,200.00
Kg - 36,800.00
Kg - 14,900.00
Kg - 107,200.00
Kg - 96,300.00
Kg 61,500.00
Kg 82,600.00
Kg 113,000.00
Kg 56,300.00
Kg 70,900.00
Kg 97,800.00
Kg 27,300.00
Kg 30,600.00
Kg 36,800.00
Kg 59,600.00
Kg - 50,500.00
Kg - 17,500.00
Kg - 46,900.00
Ltr M.090.f 18,900.00
Ltr - 24,000.00
Ltr - 65,400.00
Ltr - 45,200.00
Kg - 43,100.00
Kg - 13,700.00
Kg - 19,700.00
Tube - 33,800.00
Kg - 24,300.00
Kg - 13,800.00
Ltr - 48,400.00
Ltr - 12,800.00
Bh - 24,900.00
Kg M.090.e 84,000.00
Kg M.090.g 40,200.00
Kg M.090.h 103,500.00
Kg - 23,000.00
M² - 51,400.00
Kg M.167 13,500.00
Kg - 16,800.00
Kg M.168 21,300.00
Kg - 20,600.00
Kg - 17,800.00
Btg M.163 4,900.00
bh - 18,400.00
bh - 17,300.00
Bh - 356,500.00
Kg - 15,000.00
Kg - 11,500.00
Kg - 12,700.00
Btg - 6,100.00
Kg - 32,800.00
M² - 30,300.00
M² - 11,500.00
Btg - 136,000.00
Btg - 107,100.00
Btg - 160,800.00
Btg - 235,800.00
Btg - 283,300.00
Btg - 348,300.00
448,500.00
Btg - 669,900.00
Btg - 1,063,800.00
Btg 1,100,000.00
Btg 1,980,000.00
M² - 715,000.00
Meter - 97,800.00
Meter - 109,300.00
Unit - 1,725,000.00
Meter 138,000.00
Meter 74,800.00
Meter 74,800.00
M² - 264,500.00
M² - 290,400.00
M² - 247,500.00
M² - 326,700.00
M² - 184,000.00
M² - 242,000.00
M² - 205,700.00
M² - 278,300.00
btg 60,400.00
btg 94,300.00
btg 86,300.00
bh 6,600.00
bh 6,600.00
bh 900.00
bh 900.00
bh 900.00
M² - 1,045,000.00
Lbr 1,540,000.00
M² - 148,500.00
btg 137,500.00
btg 80,000.00
set/hari
Bh - 281,100.00
Bh - 12,000.00
Bh - 11,400.00
Bh - 148,500.00
Bh - 12,300.00
Bh - 21,100.00
Bh - 19,600.00
Bh - 7,300.00
Bh - 206,000.00
Bh - 186,900.00
Bh - 54,600.00
Bh - 47,900.00
Bh - 69,900.00
Bh - 196,800.00
Bh - 60,400.00
Kg M.166.a 24,000.00
Kg M.166.b 22,900.00
Kg - 36,100.00
Kg - 20,800.00
Kg - 23,900.00
Kg 12,300.00
Bh 1,500.00
Bh 1,700.00
Kg 55,600.00
Bh 1,200.00
Bh - 600.00
Bh 600.00
Unit - 4,840,000.00
Unit - 2,420,000.00
Unit - 1,815,000.00
Unit - 726,000.00
Lbr - 6,100.00
Lbr - 65,800.00
M² - 78,700.00
Lbr 56,400.00
Lbr - 59,100.00
Lbr - 59,900.00
Lbr - 60,500.00
Lbr 40,300.00
Lbr 40,300.00
Lbr 40,300.00
Lbr 310,500.00
Lbr 177,100.00
Lbr 222,000.00
Lbr 55,800.00
Lbr 62,100.00
Lbr 108,700.00
Lbr 109,300.00
Lbr 110,400.00
Lbr 97,800.00
Lbr 102,900.00
Lbr 102,900.00
M 63,300.00
Lbr 105,800.00
Lbr 73,600.00
Lbr 61,000.00
Lbr - 86,300.00
Lbr - 86,300.00
M² - 93,500.00
M² - 128,700.00
M² 54,100.00
M² 73,600.00
M² - 115,000.00
M² - 129,200.00
M² 90,000.00
Bh - 52,900.00
Bh - 80,500.00
M' - 57,500.00
M' - 111,400.00
M' - 125,900.00
M' - 141,600.00
M' - 50,900.00
M' - 58,100.00
M' - 47,200.00
M' - 50,900.00
Lbr - 73,200.00
Lbr - 44,300.00
Lbr - 46,200.00
Lbr - 76,300.00
M' - 23,000.00
Lbr - 62,400.00
M² 87,300.00
M² - 138,100.00
M² - 80,500.00
M² 96,400.00
M² - 92,000.00
M² - 63,300.00
Lbr - 53,500.00
M² - 60,500.00
M² - 128,200.00
M² - 128,200.00
Lbr - 17,500.00
Lbr - 151,800.00
Lbr - 304,800.00
M² - 162,900.00
M² - 632,500.00
M² - 192,600.00
M² - 276,000.00
M² 517,500.00
M² - 2,702,500.00
Kg - 122,900.00
Bh - 287,500.00
Bh - 345,000.00
M² - 241,500.00
M² - 402,500.00
M² - 253,000.00
M² - 159,500.00
Lbr - 63,200.00
Lbr - 125,500.00
Lbr - 196,300.00
Lbr 259,700.00
Lbr 161,000.00
Lbr 126,500.00
Lbr 117,300.00
Lbr 204,100.00
Lbr 205,700.00
Lbr - 224,300.00
Lbr - 114,400.00
Lbr - 78,600.00
Lbr - 68,700.00
Lbr 43,100.00
Lbr 66,100.00
Lbr 86,300.00
Bh - 1,111,000.00
Bh 1,092,500.00
Bh - 2,385,400.00
Bh - 2,702,500.00
Bh - 339,000.00
Bh - 178,000.00
Unit 2,160,000.00
Bh 310,500.00
Unit 265,000.00
Unit 378,000.00
Bh 367,000.00
Bh 75,000.00
Bh 353,000.00
Unit 747,500.00
Bh 172,500.00
M² 345,000.00
Bh - 29,800.00
Btg - 21,600.00
Btg - 26,500.00
Btg - 40,900.00
Btg - 76,500.00
Btg - 131,100.00
Btg - 215,800.00
Btg - 753,500.00
Btg 19,700.00
Btg 25,900.00
Btg 36,700.00
Btg 80,200.00
Btg 153,000.00
Btg 253,100.00
Btg 19,700.00
Btg 25,900.00
Btg 52,200.00
Btg 88,500.00
Btg 134,400.00
Bh 45,700.00
Bh 58,900.00
Bh 132,800.00
Bh 1,607,100.00
Bh 935,300.00
Bh 79,100.00
Bh 86,300.00
Unit 132,300.00
Unit 1,656,000.00
Unit 502,200.00
M² - 201,300.00
M² - 241,500.00
M² - 264,500.00
M² - 310,500.00
M² - 195,500.00
M² - 235,800.00
M² - 258,800.00
M² 201,300.00
M² 241,500.00
M² 264,500.00
M² 201,300.00
M² 241,500.00
M² 264,500.00
buah 2,875,000.00
buah 5,175,000.00
bungkus 86,300.00
M² 2,300,000.00
Unit 16,410,100.00
Unit - 6,803,000.00
Unit - 4,642,500.00
Unit - 6,362,500.00
Unit - 5,328,000.00
Unit - 6,155,500.00
Set - 678,700.00
Set - 8,320,200.00
Set - 6,933,500.00
Set - 4,486,400.00
Tiang - 9,665,000.00
Tiang - 8,482,200.00
Btg - 9,019,500.00
Btg - 9,473,200.00
Tiang - 110,772,800.00
Tiang - 100,526,200.00
Btg - 13,508,100.00
Btg - 15,407,000.00
Btg - 13,507,800.00
Btg - 14,193,300.00
Btg - 1,225,200.00
Btg - 1,225,100.00
Btg - 1,140,700.00
12 - 850,000.00
Btg - 644,400.00
Set - 5,812,800.00
Set - 4,207,800.00
Buah - 994,000.00
Buah - 311,300.00
Buah - 200,800.00
Buah - 155,600.00
Buah - 466,600.00
Buah - 371,800.00
Buah - 180,200.00
Buah - 510,100.00
Buah - 350,200.00
Buah - 309,500.00
Buah - 232,100.00
Buah - 29,700.00
Buah - 24,500.00
Buah - 20,400.00
Buah - 18,000.00
Buah - 20,400.00
Buah - 18,000.00
Buah - 253,000.00
Buah - 184,900.00
Buah - 87,500.00
Buah - 605,200.00
Buah - 605,200.00
Buah - 87,500.00
Buah - 925,400.00
Buah - 419,500.00
Buah - 404,500.00
Buah - 309,500.00
Buah - 210,100.00
Buah - 350,200.00
Buah - 350,200.00
Buah - 309,500.00
Buah - 187,000.00
Buah - 448,100.00
Kotak - 73,800.00
Kotak - 73,800.00
Meter - 55,400.00
Buah - 2,800.00
Buah - 4,700.00
Buah - 4,700.00
Buah - 4,700.00
Buah - 6,600.00
Buah - 6,600.00
Buah - 5,300.00
Buah - 8,300.00
Buah - 18,500.00
Buah - 54,300.00
Buah - 29,500.00
Buah - 15,400.00
Set - 716,200.00
Buah - 175,500.00
Buah - 55,400.00
Buah - 46,100.00
Buah - 183,000.00
Buah - 46,200.00
Buah - 7,400.00
Buah - 8,300.00
Buah - 46,200.00
Buah - 46,200.00
Buah - 37,000.00
Buah - 93,500.00
Buah - 197,300.00
Buah - 110,800.00
Buah - 27,700.00
Buah - 29,600.00
Buah - 42,500.00
Buah - 49,900.00
Buah - 51,800.00
Buah - 68,400.00
Buah - 165,000.00
Buah - 53,800.00
Buah - 59,900.00
Buah - 77,500.00
Buah - 36,900.00
Buah - 44,400.00
Buah - 69,200.00
Buah - 183,100.00
Buah - 53,600.00
Buah - 105,300.00
roll - 120,000.00
Meter - 4,000.00
Meter - 6,200.00
Meter - 9,700.00
Meter - 16,300.00
Meter - 23,300.00
Meter - 25,100.00
Meter - 33,000.00
Meter - 31,600.00
Meter - 31,200.00
Meter - 46,200.00
Meter - 74,900.00
Meter - 87,800.00
Meter - 101,900.00
Meter - 363,900.00
Meter - 406,300.00
Meter - 498,600.00
Meter - 20,700.00
Meter - 16,900.00
Meter - 24,700.00
Meter - 23,100.00
Meter - 35,300.00
Meter - 40,200.00
Meter - 60,100.00
Meter - 221,700.00
Meter - 272,900.00
Meter - 324,800.00
Meter - 363,700.00
Meter - 443,400.00
Meter - 471,400.00
Meter - 26,300.00
Meter - 8,000.00
Meter - 19,600.00
Meter - 13,600.00
Meter - 5,900.00
Meter - 7,400.00
Meter - 10,500.00
Meter - 36,900.00
Meter - 13,500.00
Meter - 34,000.00
Meter - 4,200.00
Meter - 7,100.00
Buah - 1,237,200.00
Roll - 73,800.00
Meter - 36,900.00
Meter - 73,800.00
Roll - 240,000.00
Meter - 10,500.00
Roll - 104,500.00
Meter - 2,700.00
Meter - 3,700.00
Meter - 2,200.00
Meter - 9,500.00
Meter - 13,200.00
Buah - 11,000.00
Buah - 5,500.00
Buah - 73,800.00
Buah - 1,472,200.00
Buah - 10,700.00
Buah - 9,300.00
Buah - 46,200.00
Buah - 3,900.00
Buah - 9,400.00
Buah - 38,500.00
Buah - 23,300.00
Buah - 23,300.00
Buah - 29,500.00
Buah - 3,300.00
Buah - 18,700.00
Buah - 92,400.00
Buah - 92,400.00
Buah - 7,200.00
Buah - 133,000.00
Buah - 59,400.00
Buah - 128,700.00
Buah - 173,300.00
Buah - 500.00
Buah - 207,900.00
Buah - 36,600.00
Buah - 58,600.00
Buah - 129,200.00
Buah - 129,200.00
Buah - 5,600.00
Buah - 14,800.00
Buah - 1,100.00
Buah - 40,000.00
Buah - 46,600.00
Buah - 203,400.00
Buah - 333,200.00
Buah - 273,000.00
Buah - 295,000.00
Buah - 313,700.00
Buah - 149,100.00
Buah - 159,800.00
Buah - 235,920.00
Buah - 375,400.00
Buah - 4,700.00
Buah - 368,500.00
Buah - 1,213,400.00
Buah - 664,900.00
Buah - 1,766,600.00
Buah - 33,300.00
Buah - 433,500.00
Buah - 64,700.00
Buah - 46,600.00
Buah - 46,600.00
Buah - 40,000.00
Buah - 8,400.00
Buah - 69,300.00
Buah - 166,200.00
Batang - 304,900.00
Batang - 10,200.00
Batang - 2,800.00
Batang - 12,100.00
Batang - 11,100.00
Batang - 22,200.00
Batang - 57,900.00
Batang - 199,700.00
Batang - 110,800.00
Batang - 129,300.00
Unit - 1,916,500.00
Buah - 3,800.00
Buah - 18,500.00
Buah - 27,700.00
Buah - 6,600.00
Buah 11,000.00
Buah 33,000.00
Buah - 14,900.00
Buah 49,500.00
Buah - 5,800.00
Buah - 18,700.00
Buah 66,000.00
Buah - 73,800.00
Buah - 12,100.00
Buah - 406,300.00
Buah - 27,700.00
Buah - 166,200.00
Buah - 12,700.00
Buah - 11,100.00
Buah - 13,000.00
Buah - 3,800.00
Bungkus - 1,300.00
Bungkus - 1,800.00
Bungkus - 2,000.00
Bungkus - 3,800.00
Bungkus - 5,200.00
Bungkus - 5,600.00
Bungkus - 6,600.00
Bungkus - 11,200.00
Buah - 1,300.00
Buah - 3,800.00
Buah - 166,300.00
Buah - 70,300.00
Buah - 46,200.00
Buah - 1,000.00
Buah - 27,700.00
Buah - 1,200,500.00
Buah - 37,000.00
Buah - 37,000.00
Buah - 37,000.00
Buah - 37,000.00
Buah - 369,400.00
Buah - 788,200.00
Buah - 14,300.00
Buah - 23,300.00
Buah - 9,300.00
Buah - 27,700.00
Buah - 46,200.00
Buah - 83,100.00
Buah - 8,600.00
Buah - 46,200.00
Set - 256,300.00
REKAPITULASI
( RENCANA ANGGARAN BIAYA )
1 2
A PEKERJAAN PENDAHULUAN
B PEKERJAAN STANDAR
I Pekerjaan Dinding dan Plesteran
1. Pekerjaan Dinding dan Plesteran ( Lt. 1 )
2. Pekerjaan Dinding dan Plesteran ( Lt. 2 )
II Pekerjaan Plafond
1. Pekerjaan Plafond dan List Profil ( Lt. 2 )
2. Pekerjaan Plafond dan List Profil ( Lt. 2 )
III Pekerjaan Lantai Keramik
1. Pekerjaan Lantai dan Dinding Keramik (Lt. 1)
2. Pekerjaan Lantai dan Dinding Keramik (Lt. 2)
IV Pekerjaan Pintu, Jendela dan Ventilasi
1. Pekerjaan Pintu, Jendela dan Ventilasi (Lt. 1)
2. Pekerjaan Pintu, Jendela dan Ventilasi (Lt. 2)
V Pekerjaan Mekanikal Elektrikal
1. Pekerjaan Mekanikal Elektrikal ( Lt. 1 )
2. Pekerjaan Mekanikal Elektrikal ( Lt. 2 )
VI Pekerjaan Pengecatan
1. Pekerjaan Pengecatan ( Lt.1 )
2. Pekerjaan Pengecatan ( Lt. 2 )
VII Pekerjaan Jaringan Pipa Sanitasi
1. Pekerjaan Jaringan Pipa (Lt. 1)
2. Pekerjaan Jaringan Pipa (Lt. 2)
VIII Pekerjaan Atap & Railing Tangga
C PEKERJAAN NON STANDAR
I Pekerjaan Sanitasi
1. Pekerjaan Sanitasi Lantai 1
2. Pekerjaan Sanitasi Lantai 2
II Pekerjaan Pemasangan Titik Exhaus fan
1. Pekerjaan Exhaus Fan Lantai 1
2. Pekerjaan Exhaus Fan Lantai 2
III Pekerjaan Pemasangan Titik AC
1. Pekerjaan Pemasangan AC 1 Pk Lantai 1
2. Pekerjaan Pemasangan AC 1 Pk Lantai 2
IV Pekerjaan Perkerasan Lanskape
V Pekerjaan Pagar
VI Pekerjaan Kanopi Parkir
1. Pekerjaan Kanopi Parkir Umum
2. Pekerjaan Kanopi Parkir Khusus
esmas Tahap II
ehat,Kota Pontianak
TOTAL BIAYA
(Rp)
300,000.00
1,834,221,989.58
21,754,167.15
91,116,878.62
130,750,465.75
134,937,324.56
307,773,067.95
266,554,254.67
286,488,011.51
234,197,486.93
41,551,950.00
27,728,500.00
112,359,485.75
109,641,858.83
24,295,247.34
7,096,869.73
37,976,420.80
417,710,837.26
46,493,105.91
19,566,739.00
27,492,984.21
38,610,877.57
16,301,600.00
16,301,600.00
114,489,810.57
93,729,197.36
23,135,399.48
21,589,523.16
2,252,232,826.85
225,223,282.68
2,477,456,109.53 Pagu
2,477,450,000.00
2252232826.84546
4386696091.65207
Pontianak, Mei 2014
Konsultan Perencana
CV. TRI WASTU
A. Roffie Faturrahman
Team Leader
0.005
0.328
1.372
0.000
1.969
2.033
0.000
4.636
4.015
0.000
4.315
3.528
0.000
0.626
0.418
0.000
1.692
1.651
0.000
0.366
0.107
0.572
0.000
0.000
0.700
0.295
0.000
0.414
0.582
0.000
0.246
0.246
4386696091.65 1.725
2252232826.85 1.412
6638928918.50 0.000
0.348
0.325
0.000
0.608
2,500,000,000.00
2,477,450,000.00 18.545
22,550,000.00 5.827
-
Err:509 14.161
13.231
-
4.119
2.723
-
1.887
-
0.784
-
1.166
2.446
-
0.579
100.000
ANALISA SATUAN BAHAN DAN UPAH
1m2 Pembuatan Direksi Keet / Gudang Bahan Bangunan dan Alat / Bedeng Pekerja
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Kayu OH 95,000.00
2 Pekerja OH 75,000.00
3 Kepala Tukang OH 105,000.00
4 Mandor OH 105,000.00
Jumlah
B BAHAN
1 Kayu Pancang (Dolken) d = 10cm, p = 4m Btg 7,000.00
2 Kayu Kelas III 3 1,991,500.00
M
3 Paku Kg 22,900.00
4 Seng Gelombang BJLS 0.20 Lbr 73,200.00
5 Triplek 4mm Lbr 63,200.00
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : ABK Bangunan Gedung dan Perumahan - 6.9
PEKERJAAN TANAH (P.T.)
Jumlah
C Jumlah A + B
D Harga Satuan
PEKERJAAN BETON BERTULANG (P.BB.)
Membuat 1m3 Lantai Kerja Beton Mutu f'c = 7,4 Mpa (K 100), slump (3-6) cm, w/c = 0
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Pekerja OH 75,000.00
2 Tukang Batu OH 95,000.00
3 Kepala Tukang OH 105,000.00
4 Mandor OH 105,000.00
Jumlah
B BAHAN
1 Semen Portland Kg 1,586.00
2 Pasir Kg 66.21
3 Batu pecah 1-2 cm (Kerikil) Kg 339.11
4 Air Liter 0.00
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI DT 91-0008-2007
Membuat 1m3 Beton Mutu f'c = 19,3 Mpa (K 225), slump (12 ± 2) cm, w/c = 0,58 (P.BB
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Pekerja OH 75,000.00
2 Tukang Batu OH 95,000.00
3 Kepala Tukang OH 105,000.00
4 Mandor OH 105,000.00
Jumlah
B BAHAN
1 Semen Portland Kg 1,586.00
2 Pasir Kg 66.21
3 Batu pecah 1-2 cm (Kerikil) Kg 339.11
4 Air Liter 0.00
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI DT 91-0008-2007
CATATAN : Bobot isi pasir = 1.400 kg/m3, Bobot isi kerikil = 1.350 kg/m3, Buckling factor pasir = 20%
Membuat 1m3 Beton Mutu f'c = 26,4 Mpa (K 300), slump (12 ± 2) cm, w/c = 0,52 (P.BB
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Pekerja OH 75,000.00
2 Tukang Batu OH 95,000.00
3 Kepala Tukang OH 105,000.00
4 Mandor OH 105,000.00
Jumlah
B BAHAN
1 Semen Portland Kg 1,586.00
2 Pasir Kg 66.21
3 Batu pecah 1-2 cm (Kerikil) Kg 339.11
4 Air Liter 0.00
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI DT 91-0008-2007
CATATAN : Bobot isi pasir = 1.400 kg/m3, Bobot isi kerikil = 1.350 kg/m3, Buckling factor pasir = 20%
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI DT 91-0008-2007
Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya Pekerjaan BOW - H.10
1m2 Pengecatan Tembok Baru (1 Lapis Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penut
Dengan Cat Mutu Baik. (P.Ct. 11)
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Pekerja OH 75,000.00
2 Tukang Cat OH 95,000.00
3 Kepala Tukang OH 105,000.00
4 Mandor OH 105,000.00
Jumlah
B BAHAN
1 Plamur (dempul tembok) Kg 17,500.00
2 Cat Dasar tembok Kg 36,800.00
3 Cat Tembok Penutup 2 x Kg 14,900.00
C Jumlah A + B
D Harga Satuan
Acuan : ABK Bangunan Gedung dan Perumahan - 6.14
SA SATUAN BAHAN DAN UPAH
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6
0.100 9,500.00
0.100 7,500.00
0.010 1,050.00
0.005 525.00
18,575.00
1.000 7,000.00
0.020 458.00
0.007 17,010.70
24,468.70
43,043.70
43,043.70
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6
0.100 7,500.00
0.050 5,250.00
12,750.00
12,750.00
12,750.00
2.000 190,000.00
1.000 75,000.00
0.200 21,000.00
0.050 5,250.00
291,250.00
1.250 8,750.00
0.186 370,419.00
0.300 6,870.00
1.500 109,800.00
1.3500 85,320.00
581,159.00
872,409.00
872,409.00
PEKERJAAN TANAH (P.T.)
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6
0.750 56,250.00
0.025 2,625.00
58,875.00
58,875.00
58,875.00
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6
0.300 22,500.00
0.010 1,050.00
23,550.00
1.200 111,240.00
111,240.00
134,790.00
134,790.00
0.192 14,400.00
0.019 1,995.00
16,395.00
0.00
16,395.00
16,395.00
RJAAN BETON BERTULANG (P.BB.)
Mutu f'c = 7,4 Mpa (K 100), slump (3-6) cm, w/c = 0,87 (P.BB. 01)
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6
1.200 90,000.00
0.200 19,000.00
0.020 2,100.00
0.060 6,300.00
117,400.00
230.000 364,780.00
893.000 59,129.36
1,027.000 348,267.11
0.000 0.00
772,176.47
889,576.47
889,576.47
,3 Mpa (K 225), slump (12 ± 2) cm, w/c = 0,58 (P.BB. 04)
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6
1.650 123,750.00
0.275 26,125.00
0.028 2,940.00
0.083 8,715.00
161,530.00
371.000 588,406.00
698.000 46,217.57
1,047.000 355,049.33
0.000 0.00
989,672.90
1,151,202.90
1,151,202.90
1.650 123,750.00
0.275 26,125.00
0.028 2,940.00
0.083 8,715.00
161,530.00
413.000 655,018.00
681.000 45,091.93
1,021.000 346,232.44
0.000 0.00
1,046,342.37
1,207,872.37
1,207,872.37
BIAYA
KUANTITAS SATUAN
KUANTITAS
( Rp. )
5 6
0.070 5,250.00
0.070 6,650.00
0.007 735.00
0.004 420.00
13,055.00
10.500 141,750.00
0.150 3,195.00
144,945.00
158,000.00
158,000.00
15,800.00
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6
0.0250 1,875.00
0.0250 2,375.00
0.0250 2,625.00
0.0010 105.00
6,980.00
10.200 171,360.00
0.050 1,065.00
172,425.00
179,405.00
179,405.00
17,940.50
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6
0.520 39,000.00
0.260 24,700.00
0.026 2,730.00
0.026 2,730.00
69,160.00
34,580.00
0.031 75,333.10
0.300 6,870.00
82,203.10
116,783.10
116,783.10
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6
0.520 39,000.00
0.260 24,700.00
0.026 2,730.00
0.026 2,730.00
69,160.00
0.045 89,617.50
0.300 6,870.00
0.100 650.00
97,137.50
166,297.50
166,297.50
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6
0.660 49,500.00
0.330 31,350.00
0.033 3,465.00
0.033 3,465.00
87,780.00
0.055 109,532.50
0.400 9,160.00
0.022 53,462.20
2.000 14,000.00
186,154.70
273,934.70
273,934.70
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6
0.660 49,500.00
0.330 31,350.00
0.033 3,465.00
0.033 3,465.00
87,780.00
0.400 9,160.00
0.058 115,507.00
0.022 53,462.20
2.000 14,000.00
192,129.20
279,909.20
279,909.20
BIAYA
KUANTITAS SATUAN
KUANTITAS
( Rp. )
5 6
0.660 49,500.00
0.330 31,350.00
0.033 3,465.00
0.033 3,465.00
87,780.00
0.400 9,160.00
0.055 109,532.50
0.022 53,462.20
6.000 42,000.00
214,154.70
301,934.70
301,934.70
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6
0.660 49,500.00
0.330 31,350.00
0.033 3,465.00
0.033 3,465.00
87,780.00
0.030 59,745.00
0.400 9,160.00
0.015 50,446.50
0.350 68,705.00
2.000 14,000.00
202,056.50
289,836.50
289,836.50
PEKERJAAN DINDING (P.Dnd.)
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6
0.32 24,000.00
0.10 9,500.00
0.01 1,050.00
0.015 1,575.00
36,125.00
12.5 13,750.00
7.500 11,895.00
0.027 2,502.90
28,147.90
64,272.90
64,272.90
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6
0.300 22,500.00
0.150 14,250.00
0.015 1,575.00
0.015 1,575.00
39,900.00
7.776 12,332.74
0.023 2,132.10
14,464.84
54,364.84
54,364.84
7.000 525,000.00
21.000 1,995,000.00
2.100 220,500.00
0.350 36,750.00
2,777,250.00
1.100 10,246,500.00
1.250 28,625.00
1.000 19,700.00
10,294,825.00
13,072,075.00
13,072,075.00
KERJAAN PENUTUP ATAP (P.PA.)
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6
0.200 15,000.00
0.100 9,500.00
0.010 1,050.00
0.001 105.00
25,655.00
1.620 98,820.00
0.200 4,580.00
103,400.00
129,055.00
129,055.00
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6
0.250 23,750.00
0.025 2,625.00
0.250 18,750.00
45,125.00
0.100 2,290.00
6.000 277,200.00
0.072 517,500.00
796,990.00
842,115.00
842,115.00
Jadi 1 M1 84,211.50
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6
0.100 7,500.00
0.050 4,750.00
0.005 525.00
0.005 525.00
13,300.00
0.364 28,610.40
0.110 2,629.00
31,239.40
44,539.40
44,539.40
KERJAAN PENGECATAN (P.Ct.)
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6
0.020 1,500.00
0.063 5,985.00
0.0063 661.50
0.0025 262.50
8,409.00
0.100 1,750.00
0.120 4,416.00
0.260 3,874.00
10,040.00
18,449.00
18,449.00
ANALISA SATUAN BAHAN DAN UPAH
Jumlah
C Jumlah A + B
D Harga Satuan
PEKERJAAN BETON BERTULANG (P.BB.)
Membuat 1m3 Lantai Kerja Beton Mutu f'c = 7,4 Mpa (K 100), slump (3-6) cm, w/c = 0,87 (P.BB. 0
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Pekerja OH 82,500.00
2 Tukang Batu OH 104,500.00
3 Kepala Tukang OH 115,500.00
4 Mandor OH 115,500.00
Jumlah
B BAHAN
1 Semen Portland Kg 1,744.60
2 Pasir Kg 72.84
3 Batu pecah 1-2 cm (Kerikil) Kg 373.02
4 Air Liter 0.00
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI DT 91-0008-2007
Membuat 1m3 Beton Mutu f'c = 19,3 Mpa (K 225), slump (12 ± 2) cm, w/c = 0,58 (P.BB. 04)
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Pekerja OH 82,500.00
2 Tukang Batu OH 104,500.00
3 Kepala Tukang OH 115,500.00
4 Mandor OH 115,500.00
Jumlah
B BAHAN
1 Semen Portland Kg 1,744.60
2 Pasir Kg 72.84
3 Batu pecah 1-2 cm (Kerikil) Kg 373.02
4 Air Liter 0.00
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI DT 91-0008-2007
CATATAN : Bobot isi pasir = 1.400 kg/m3, Bobot isi kerikil = 1.350 kg/m3, Buckling factor pasir = 20%
Membuat 1m3 Beton Mutu f'c = 26,4 Mpa (K 300), slump (12 ± 2) cm, w/c = 0,52 (P.BB. 06)
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Pekerja OH 82,500.00
2 Tukang Batu OH 104,500.00
3 Kepala Tukang OH 115,500.00
4 Mandor OH 115,500.00
Jumlah
B BAHAN
1 Semen Portland Kg 1,744.60
2 Pasir Kg 72.84
3 Batu pecah 1-2 cm (Kerikil) Kg 373.02
4 Air Liter 0.00
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI DT 91-0008-2007
CATATAN : Bobot isi pasir = 1.400 kg/m3, Bobot isi kerikil = 1.350 kg/m3, Buckling factor pasir = 20%
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI DT 91-0008-2007
Membuat dan Memasang 1m3 Kusen Pintu dan Kusen Jendela, Kayu Kelas I (P.K. 12)
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Pekerja OH 82,500.00
2 Tukang Kayu OH 104,500.00
3 Kepala Tukang OH 115,500.00
4 Mandor OH 115,500.00
Jumlah
B BAHAN
1 Kayu Kelas 1 uk. 5/10 (Ketam - utk Kusen) M3 10,246,500.00
2 Paku 10 cm kg 25,190.00
3 Lem Kayu kg 21,670.00
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI DT 91-0011-2007
PEKERJAAN PENUTUP ATAP (P.PA.)
Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya Pekerjaan BOW - H.10
C Jumlah A + B
D Harga Satuan
Acuan : SNI DT 91-0012-2007
1m2 Pasang Lantai Keramik 40 x 40cm Polished (setaraf Indogress) (P.LD. 04)
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Pekerja OH 82,500.00
2 Tukang Batu OH 104,500.00
3 Kepala Tukang OH 115,500.00
4 Mandor OH 115,500.00
Jumlah
B BAHAN
1 Keramik 40 x 40cm Polished (setaraf Indogress) Bh 28,600.00
2 Semen Portland Kg 1,744.60
3 Pasir Pasang M3 101,970.00
4 Semen Warna Kg 15,070.00
C Jumlah A + B
D Harga Satuan
Acuan : ABK Bangunan Gedung dan Perumahan - 6.47
1m2 Pasang Lantai Keramik 60x60 cm anti gores (P.LD. 04a)
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Pekerja OH 82,500.00
2 Tukang Batu OH 104,500.00
3 Kepala Tukang OH 115,500.00
4 Mandor OH 115,500.00
Jumlah
B BAHAN
1 Keramik 60 x 60 cm (anti gores) Bh 99,792.00
2 Semen Portland Kg 1,744.60
3 Pasir Pasang M3 101,970.00
4 Semen Warna Kg 15,070.00
C Jumlah A + B
D Harga Satuan
C Jumlah A + B
D Harga Satuan
Acuan : ABK Bangunan Gedung dan Perumahan - 6.63
1m2 Pengecatan Bidang Kayu Baru (1Lapis Plamir, 1Lapis Cat Dasar, 2Lapis Cat Penutup) (P.C
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Pekerja OH 82,500.00
2 Tukang Cat OH 104,500.00
3 Kepala Tukang OH 115,500.00
4 Mandor OH 115,500.00
Jumlah
B BAHAN
1 Cat Meni Kg 47,410.00
2 Dempul Kg 30,734.00
3 Cat Dasar Kg 56,300.00
4 Cat Kilat Penutup 2 Kali Kg 66,220.00
C Jumlah A + B
D Harga Satuan
Acuan : ABK Bangunan Gedung dan Perumahan - 6.8
1m2 Pengecatan Tembok Baru (1 Lapis Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup)
Dengan Cat Mutu Baik. (P.Ct. 11)
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Pekerja OH 82,500.00
2 Tukang Cat OH 104,500.00
3 Kepala Tukang OH 115,500.00
4 Mandor OH 115,500.00
Jumlah
B BAHAN
1 Plamur (dempul tembok) Kg 17,500.00
2 Cat Dasar tembok Kg 56,300.00
3 Cat Tembok Penutup 2 x Kg 70,900.00
C Jumlah A + B
D Harga Satuan
Acuan : ABK Bangunan Gedung dan Perumahan - 6.14
1m2 Pengecatan Tembok Baru (1 Lapis Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup)
Dengan Cat weather shield. (P.Ct. 11a)
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Pekerja OH 82,500.00
2 Tukang Cat OH 104,500.00
3 Kepala Tukang OH 115,500.00
4 Mandor OH 115,500.00
Jumlah
B BAHAN
1 Plamur (dempul tembok) Kg 17,500.00
2 Cat Dasar tembok Kg 56,300.00
3 Cat Tembok Penutup 2 x Kg 107,200.00
C Jumlah A + B
D Harga Satuan
Acuan : ABK Bangunan Gedung dan Perumahan - 6.14
C Jumlah A + B
D Harga Satuan
Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya Pekerjaan BOW - G.60
1m2 Pasang Talang Datar Seng BJLS 30 / Talang Sembunyi (P.BA. 10)
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Pekerja OH 82,500.00
2 Tukang Kayu OH 104,500.00
3 Kepala Tukang OH 115,500.00
4 Mandor OH 115,500.00
Jumlah
B BAHAN
1 Seng Plat 3' x 6' BJLS 30 Lbr 76,300.00
2 Paku 1/2" - 1" Kg 22,900.00
3 Papan Kayu Kelas 2 Tidak Ketam M3 7,187,500.00
4 Meni Kg 43,100.00
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : ABK Bangunan Gedung dan Perumahan - 6.18
B UPAH
1 Asumsi upah+bahan lainnya 25% harga bahan - 904,675.76
C Jumlah A + B
D Harga Satuan
B UPAH
1 Asumsi upah+bahan lainnya 30% harga bahan - 845,982.72
C Jumlah A + B
D Harga Satuan
Acuan : ABK Bangunan Gedung dan Perumahan - 6.14
B UPAH
1 Asumsi upah+bahan lainnya 25% harga bahan - 621,761.85
C Jumlah A + B
D Harga Satuan
B UPAH
1 Asumsi upah+bahan lainnya 25% harga bahan - 506,512.34
C Jumlah A + B
D Harga Satuan
B UPAH
1 Asumsi upah+bahan lainnya 25% harga bahan - 461,039.79
C Jumlah A + B
D Harga Satuan
B UPAH
1 Asumsi upah+bahan lainnya 25% harga bahan - 272,996.63
C Jumlah A + B
D Harga Satuan
B UPAH
1 Asumsi upah+bahan lainnya 25% harga bahan - 515,625.00
C Jumlah A + B
D Harga Satuan
B UPAH
1 Asumsi upah+bahan lainnya 25% harga bahan - 583,275.00
C Jumlah A + B
D Harga Satuan
Asumsi analisa Pekerjaan Jendela Kaca T. 5 mm (Jendela 4) Uk. 1,65 x 3,00 m
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A BAHAN
1 Rangka Jendela (Aluminium) m' 105,600.00
2 Kaca T. 5 mm m2 187,000.00
B UPAH
1 Asumsi upah+bahan lainnya 25% harga bahan - 766,012.50
C Jumlah A + B
D Harga Satuan
B UPAH
1 Asumsi upah+bahan lainnya 25% harga bahan - 870,402.50
C Jumlah A + B
D Harga Satuan
B UPAH
1 Asumsi upah+bahan lainnya 25% harga bahan - 894,547.50
C Jumlah A + B
D Harga Satuan
B UPAH
1 Asumsi upah+bahan lainnya 25% harga bahan - 466,221.25
C Jumlah A + B
D Harga Satuan
B UPAH
1 Asumsi upah+bahan lainnya 25% harga bahan - 357,500.00
C Jumlah A + B
D Harga Satuan
B UPAH
1 Asumsi upah+bahan lainnya 25% harga bahan - 662,200.00
C Jumlah A + B
D Harga Satuan
B UPAH
1 Asumsi upah+bahan lainnya 25% harga bahan - 814,550.00
C Jumlah A + B
D Harga Satuan
Asumsi analisa Pekerjaan Jendela Kaca T. 5 mm (Jendela 11) Uk. 1,25 x 1,00 m
No. URAIAN PEKERJAAN SATUAN HARGA
SATUAN
( Rp. )
1 2 3 4
A BAHAN
1 Rangka Jendela (Aluminium) m' 105,600.00
2 Kaca T. 5 mm m2 187,000.00
B UPAH
1 Asumsi upah+bahan lainnya 25% harga bahan - 263,037.50
C Jumlah A + B
D Harga Satuan
Asumsi analisa Pekerjaan Jendela Kaca T. 5 mm (Jendela 12) Uk. 1,25 x 2,00 m
No. URAIAN PEKERJAAN SATUAN HARGA
SATUAN
( Rp. )
1 2 3 4
A BAHAN
1 Rangka Jendela (Aluminium) m' 105,600.00
2 Kaca T. 5 mm m2 187,000.00
B UPAH
1 Asumsi upah+bahan lainnya 25% harga bahan - 493,075.00
C Jumlah A + B
D Harga Satuan
Asumsi analisa Pekerjaan Jendela Kaca T. 5 mm (Jendela 13) Uk. 4,75 x 1,25 m
No. URAIAN PEKERJAAN SATUAN HARGA
SATUAN
( Rp. )
1 2 3 4
A BAHAN
1 Rangka Jendela (Aluminium) m' 105,600.00
2 Kaca T. 5 mm m2 187,000.00
B UPAH
1 Asumsi upah+bahan lainnya 25% harga bahan - 1,036,578.13
C Jumlah A + B
D Harga Satuan
Asumsi analisa Pekerjaan Jendela Kaca T. 5 mm (Jendela 14) Uk. 1,50 x 10,20 m
No. URAIAN PEKERJAAN SATUAN HARGA
SATUAN
( Rp. )
1 2 3 4
A BAHAN
1 Rangka Jendela (Aluminium) m' 105,600.00
2 Kaca T. 5 mm m2 187,000.00
B UPAH
1 Asumsi upah+bahan lainnya 25% harga bahan - 2,188,395.00
C Jumlah A + B
D Harga Satuan
Asumsi analisa Pekerjaan Jendela Kaca T. 5 mm (Jendela 1B) Uk. 1,55 X 2,30 m
No. URAIAN PEKERJAAN SATUAN HARGA
SATUAN
( Rp. )
1 2 3 4
A BAHAN
1 Rangka Jendela (Aluminium) m' 105,600.00
2 Kaca T. 5 mm m2 187,000.00
B UPAH
1 Asumsi upah+bahan lainnya 25% harga bahan - 635,263.75
C Jumlah A + B
D Harga Satuan
B UPAH
1 Asumsi upah+bahan lainnya 25% harga bahan - 317,295.00
C Jumlah A + B
D Harga Satuan
B UPAH
1 Asumsi upah+bahan lainnya 20% harga bahan - 45,496.00
C Jumlah A + B
D Harga Satuan
B UPAH
1 Asumsi upah+bahan lainnya 20% harga bahan - 82,544.00
C Jumlah A + B
D Harga Satuan
AN UPAH
P.Ps)
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6
0.100 10,450.00
0.100 8,250.00
0.010 1,155.00
0.005 577.50
20,432.50
0.120 262,878.00
0.020 503.80
0.007 18,711.77
282,093.57
302,526.07
45,378.91
347,904.98
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6
0.100 8,250.00
0.050 5,775.00
14,025.00
14,025.00
14,025.00
T.)
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6
0.750 61,875.00
0.025 2,887.50
64,762.50
64,762.50
64,762.50
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6
0.300 24,750.00
0.010 1,155.00
25,905.00
1.200 122,364.00
122,364.00
148,269.00
148,269.00
aan galian
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6
0.192 15,840.00
0.019 2,194.50
18,034.50
0.00
18,034.50
18,034.50
NG (P.BB.)
1.200 99,000.00
0.200 20,900.00
0.020 2,310.00
0.060 6,930.00
129,140.00
230.000 401,258.00
893.000 65,042.29
1,027.000 383,093.82
0.000 0.00
849,394.12
978,534.12
978,534.12
1.650 136,125.00
0.275 28,737.50
0.028 3,234.00
0.083 9,586.50
177,683.00
371.000 647,246.60
698.000 50,839.33
1,047.000 390,554.27
0.000 0.00
1,088,640.20
1,266,323.20
1,266,323.20
r pasir = 20%
cm, w/c = 0,52 (P.BB. 06)
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6
1.650 136,125.00
0.275 28,737.50
0.028 3,234.00
0.083 9,586.50
177,683.00
413.000 720,519.80
681.000 49,601.12
1,021.000 380,855.69
0.000 0.00
1,150,976.61
1,328,659.61
1,328,659.61
r pasir = 20%
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6
0.070 5,775.00
0.070 7,315.00
0.007 808.50
0.004 462.00
14,360.50
10.500 155,925.00
0.150 3,514.50
159,439.50
173,800.00
173,800.00
17,380.00
BIAYA
KUANTITAS SATUAN
KUANTITAS
( Rp. )
5 6
0.0250 2,062.50
0.0250 2,612.50
0.0250 2,887.50
0.0010 115.50
7,678.00
10.200 188,496.00
0.050 1,171.50
189,667.50
197,345.50
197,345.50
19,734.55
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6
0.520 42,900.00
0.260 27,170.00
0.026 3,003.00
0.026 3,003.00
76,076.00
38,038.00
0.031 82,866.41
0.300 7,557.00
90,423.41
128,461.41
128,461.41
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6
0.520 42,900.00
0.260 27,170.00
0.026 3,003.00
0.026 3,003.00
76,076.00
0.045 98,579.25
0.300 7,557.00
0.100 715.00
106,851.25
182,927.25
182,927.25
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6
0.660 54,450.00
0.330 34,485.00
0.033 3,811.50
0.033 3,811.50
96,558.00
0.055 120,485.75
0.400 10,076.00
0.022 58,808.42
2.000 15,400.00
204,770.17
301,328.17
301,328.17
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6
0.660 54,450.00
0.330 34,485.00
0.033 3,811.50
0.033 3,811.50
96,558.00
0.400 10,076.00
0.058 127,057.70
0.022 58,808.42
2.000 15,400.00
211,342.12
307,900.12
307,900.12
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6
0.660 54,450.00
0.330 34,485.00
0.033 3,811.50
0.033 3,811.50
96,558.00
0.400 10,076.00
0.055 120,485.75
0.022 58,808.42
6.000 46,200.00
235,570.17
332,128.17
332,128.17
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6
0.660 54,450.00
0.330 34,485.00
0.033 3,811.50
0.033 3,811.50
96,558.00
0.030 65,719.50
0.400 10,076.00
0.015 55,491.15
0.350 75,575.50
2.000 15,400.00
222,262.15
318,820.15
318,820.15
Dnd.)
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6
0.32 26,400.00
0.10 10,450.00
0.01 1,155.00
0.015 1,732.50
39,737.50
12.5 15,125.00
7.500 13,084.50
0.027 2,753.19
30,962.69
70,700.19
70,700.19
.Pls)
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6
0.300 24,750.00
0.150 15,675.00
0.015 1,732.50
0.015 1,732.50
43,890.00
10.224 17,836.79
0.020 2,039.40
19,876.19
63,766.19
63,766.19
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6
0.300 24,750.00
0.150 15,675.00
0.015 1,732.50
0.015 1,732.50
43,890.00
7.776 13,566.01
0.023 2,345.31
15,911.32
59,801.32
59,801.32
K.)
7.000 577,500.00
21.000 2,194,500.00
2.100 242,550.00
0.350 40,425.00
3,054,975.00
1.100 11,271,150.00
1.250 31,487.50
1.000 21,670.00
11,324,307.50
14,379,282.50
14,379,282.50
P (P.PA.)
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6
0.200 16,500.00
0.100 10,450.00
0.010 1,155.00
0.001 115.50
28,220.50
1.620 108,702.00
0.200 5,038.00
113,740.00
141,960.50
141,960.50
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6
0.250 26,125.00
0.025 2,887.50
0.250 20,625.00
49,637.50
0.100 2,519.00
6.000 304,920.00
0.072 569,250.00
876,689.00
926,326.50
926,326.50
Jadi 1 M 1
92,632.65
P.Pf.)
BIAYA
KUANTITAS
KUANTITAS SATUAN
( Rp. )
5 6
0.100 8,250.00
0.050 5,225.00
0.005 577.50
0.005 577.50
14,630.00
0.364 31,471.44
0.110 2,891.90
34,363.34
48,993.34
48,993.34
P. Snt.)
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6
1.100 114,950.00
3.300 272,250.00
0.001 115.50
0.160 18,480.00
405,795.50
1.000 1,201,750.00
6% Harga Kloset 72,105.00
1,273,855.00
1,679,650.50
1,679,650.50
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6
0.036 2,970.00
0.060 6,270.00
0.006 693.00
0.0018 207.90
10,140.90
1.200 8,745.00
35% Harga Pipa 2,550.63
11,295.63
21,436.53
21,436.53
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6
0.054 4,455.00
0.090 9,405.00
0.009 1,039.50
0.0027 311.85
15,211.35
1.200 25,245.00
35% Harga Pipa 7,363.13
32,608.13
47,819.48
47,819.48
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6
0.081 6,682.50
0.135 14,107.50
0.0135 1,559.25
0.0041 473.55
22,822.80
1.200 71,214.00
35% Harga Pipa 20,770.75
91,984.75
114,807.55
114,807.55
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6
0.010 825.00
0.100 10,450.00
0.010 1,155.00
0.005 577.50
13,007.50
1.000 32,780.00
0.025 50.00
32,830.00
45,837.50
45,837.50
CA (P.KK.)
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6
0.010 825.00
0.500 52,250.00
0.010 1,155.00
0.005 577.50
54,807.50
1.000 205,590.00
205,590.00
260,397.50
260,397.50
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6
0.015 1,237.50
0.150 15,675.00
0.015 1,732.50
0.00075 86.63
18,731.63
1.000 23,210.00
23,210.00
41,941.63
41,941.63
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6
0.020 1,650.00
0.200 20,900.00
0.020 2,310.00
0.001 115.50
24,975.50
1.000 21,560.00
21,560.00
46,535.50
46,535.50
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6
0.015 1,237.50
0.150 15,675.00
0.015 1,732.50
0.00075 86.63
18,731.63
1.100 197,109.00
197,109.00
215,840.63
215,840.63
NG (P.LD.)
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6
0.700 57,750.00
0.350 36,575.00
0.035 4,042.50
0.035 4,042.50
102,410.00
26.500 94,562.60
10.400 18,143.84
0.045 4,588.65
0.1620 2,441.34
119,736.43
222,146.43
222,146.43
0.620 51,150.00
0.350 36,575.00
0.035 4,042.50
0.030 3,465.00
95,232.50
6.250 178,750.00
11.380 19,853.55
0.042 4,282.74
0.1500 2,260.50
205,146.79
300,379.29
300,379.29
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6
0.620 51,150.00
0.350 36,575.00
0.035 4,042.50
0.030 3,465.00
95,232.50
2.778 277,200.00
11.380 19,853.55
0.042 4,282.74
0.1500 2,260.50
303,596.79
398,829.29
398,829.29
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6
0.600 49,500.00
0.450 47,025.00
0.045 5,197.50
0.030 3,465.00
105,187.50
20.000 109,340.00
9.300 16,224.78
0.018 1,835.46
0.200 3,014.00
130,414.24
235,601.74
235,601.74
(P.Ct.)
0.070 5,775.00
0.009 940.50
0.006 693.00
0.0025 288.75
7,697.25
0.200 9,482.00
0.150 4,610.10
0.170 9,571.00
0.260 17,217.20
40,880.30
48,577.55
48,577.55
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6
0.020 1,650.00
0.063 6,583.50
0.0063 727.65
0.0025 288.75
9,249.90
0.100 1,750.00
0.120 6,756.00
0.260 18,434.00
26,940.00
36,189.90
36,189.90
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6
0.020 1,650.00
0.063 6,583.50
0.0063 727.65
0.0025 288.75
9,249.90
0.100 1,750.00
0.120 6,756.00
0.260 27,872.00
36,378.00
45,627.90
45,627.90
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6
0.400 33,000.00
0.100 10,450.00
43,450.00
50.000 125,000.00
125,000.00
168,450.00
168,450.00
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6
0.150 12,375.00
0.400 41,800.00
0.025 2,887.50
0.00125 144.38
57,206.88
0.500 38,150.00
0.015 343.50
0.0096 69,000.00
0.250 10,775.00
118,268.50
175,475.38
175,475.38
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6
p
13.600 1,436,160.00 mul mul 2.5
1.563 292,187.50 2.88 kaca 0.25
0.615 110,201.85 kaca 0.35
1.563 187,500.00
2,026,049.35
KUANTITAS BIAYA
SATUAN
( Rp. )
5 6
p
12.800 1,351,680.00 mul mul 2.1
1.604 299,979.17 2.88 kaca 0.25
1.604 192,500.00
1,844,159.17
1,35 x 1,00 m
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6
p
8.050 850,080.00 mul mul 1.35
1.350 241,906.50 2.88 kaca 1.35
1,091,986.50
1,35 x 2,00 m
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6
p
14.750 1,557,600.00 mul mul 1.35
2.700 504,900.00 2.88 kaca 1.35
2,062,500.00
1,65 x 2,00 m
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6
p
16.250 1,716,000.00 mul mul 1.65
3.300 617,100.00 2.88 kaca 1.65
2,333,100.00
2,35 x 2,60 m
KUANTITAS BIAYA
SATUAN
( Rp. )
5 6
p
22.150 2,339,040.00 mul mul 2.35
6.110 1,142,570.00 2.88 kaca 2.35
3,481,610.00
2,35 x 2,00 m
KUANTITAS BIAYA
SATUAN
( Rp. )
5 6
p
21.400 2,259,840.00 mul mul 2.35
7.050 1,318,350.00 2.88 kaca 2.35
3,578,190.00
2,35 x 1,30 m
KUANTITAS BIAYA
SATUAN
( Rp. )
5 6
p
12.250 1,293,600.00 mul mul 2.35
3.055 571,285.00 2.88 kaca 2.35
1,864,885.00
2,00 x 1,00 m
KUANTITAS BIAYA
SATUAN
( Rp. )
5 6
p
10.000 1,056,000.00 mul mul 2
2.000 374,000.00 2.88 kaca 2
1,430,000.00
2,00x2,00 m
KUANTITAS BIAYA
SATUAN
( Rp. )
5 6
p
18.000 1,900,800.00 mul mul 2
4.000 748,000.00 2.88 kaca 2
2,648,800.00
. 2,00x2,50 m
KUANTITAS BIAYA
SATUAN
( Rp. )
5 6
p
22.000 2,323,200.00 mul mul 2
5.000 935,000.00 2.88 kaca 2
3,258,200.00
. 1,25 x 1,00 m
KUANTITAS BIAYA
SATUAN
( Rp. )
5 6
p
7.750 818,400.00 mul mul 1.25
1.250 233,750.00 2.88 kaca 1.25
1,052,150.00
. 1,25 x 2,00 m
KUANTITAS BIAYA
SATUAN
( Rp. )
5 6
p
14.250 1,504,800.00 mul mul 1.25
2.500 467,500.00 2.88 kaca 1.25
1,972,300.00
. 4,75 x 1,25 m
KUANTITAS BIAYA
SATUAN
( Rp. )
5 6
p
28.750 3,036,000.00 mul mul 4.75
5.938 1,110,312.50 2.88 kaca 4.75
4,146,312.50
. 1,50 x 10,20 m
KUANTITAS BIAYA
SATUAN
( Rp. )
5 6
p
55.800 5,892,480.00 mul mul 1.5
15.300 2,861,100.00 2.88 kaca 1.5
8,753,580.00
k. 1,55 X 2,30 m
KUANTITAS BIAYA
SATUAN
( Rp. )
5 6
p
17.750 1,874,400.00 mul mul 1.55
3.565 666,655.00 2.88 kaca 1.55
2,541,055.00
KUANTITAS BIAYA
SATUAN
( Rp. )
5 6
p
8.300 876,480.00 mul mul 1.2
2.100 392,700.00 2.88 kaca 1.2
1,269,180.00
k. 0,4 x 0,5 m
KUANTITAS BIAYA
SATUAN
( Rp. )
5 6
p
1.800 190,080.00 mul mul 0.4
0.200 37,400.00 2.88 kaca 0.4
227,480.00
k. 0,4 x 1,00 m
KUANTITAS BIAYA
SATUAN
( Rp. )
5 6
p
3.200 337,920.00 mul mul 0.4
0.400 74,800.00 2.88 kaca 0.4
412,720.00
l
0.9
1.2
0.9
l
1.1
1.2
l
1 3 4
1
l
2 5 4
2
l
2 5 4
2
l
3 5 4
3
l
2.6 5 4
2.6
l
3 4 4
3
l
1.3 3 4
1.3
l
1 3 4
1
l
2 5 4
2
l
2.5 6 4
2.5
l
1 3 4
1
l
2 5 4
2
l
1.25 5 4
1.25
l
10.2 10 4
10.2
l
2.3 7 3
2.3
l
1.75 4 2
1.75
l
0.5 2 2
0.5
l
1 3 2
1
PENGADAAN MATERIAL