I PEKERJAAN PERSIAPAN
2 Dewatering Ls 1.00
8 Pembesian Kg 982.70
VI. DIBULATKAN
RAN BIAYA (RAB)
KODE ANALISA
HARGA SATUAN ( RP ) JUMLAH HARGA ( RP )
JUMLAH I 5,132,604.20
55,117.00 7,451,818.40
T.06.a.1
32,307.00 2,839,139.16
T.14.a.1
111,507.00 10,648,918.50
T.14.a.1.1
830,307.00 175,261,201.56
P.01.c.2
74,006.00 47,543,674.58
P.04.e
19,134.00 3,520,656.00
P.16.b
693,907.00 86,911,851.75
B.01.c
13,256.00 13,026,671.20
B.17.a.1
117,169.00 16,245,481.85
B.25.b.2
3,916.00 542,953.40
B.27.b
JUMLAH II 363,992,366.40
369,124,970.60
36,912,497.06
406,037,467.66
416,501,000.00
Aceh Besar, 26 April 2018
Penawar,
CV. OZA KARYA
M. BASIR YUSRI
Direktur
DAFTAR KUANTITAS DAN HARGA
Harga Jumlah
Satuan (Rp.) Harga (Rp.)
500,000.00 500,000.00
2,000,000.00 2,000,000.00
6,000,000.00 6,000,000.00
2,000,000.00 2,000,000.00
2,000,000.00 2,000,000.00
2,000,000.00 2,000,000.00
14,500,000.00
21,500.00 858,710.00
33,700.00 642,854.46
868,000.00 40,709,200.00
77,300.00 13,390,640.35
20,300.00 816,060.00
56,417,464.81
21,500.00 2,485,728.95
33,700.00 828,598.75
868,000.00 89,317,200.00
77,300.00 30,357,959.43
20,300.00 1,790,460.00
124,779,947.13
21,500.00 5,297,813.39
33,700.00 793,070.53
868,000.00 129,710,014.00
77,300.00 40,988,711.50
20,300.00 1,893,990.00
21,500.00 977,949.00
33,700.00 186,290.23
868,000.00 22,845,760.00
77,300.00 3,679,480.00
947,100.00 4,773,384.00
Harga Jumlah
Satuan (Rp.) Harga (Rp.)
13,800.00 10,254,481.92
86,400.00 2,785,536.00
4,000.00 128,960.00
Harga Jumlah
Satuan (Rp.) Harga (Rp.)
21,500.00 412,800.00
33,700.00 60,660.00
868,000.00 9,791,040.00
77,300.00 1,576,920.00
947,100.00 2,045,736.00
13,800.00 4,413,422.16
259,200.00 902,016.00
4,000.00 13,920.00
947,100.00 3,636,864.00
13,800.00 5,646,827.52
86,400.00 2,405,376.00
4,000.00 111,360.00
255,332,382.24
21,500.00 3,587,551.28
33,700.00 637,523.12
868,000.00 83,848,800.00
77,300.00 25,021,546.20
20,300.00 1,278,900.00
21,500.00 840,542.50
33,700.00 171,533.00
868,000.00 18,488,400.00
77,300.00 3,710,400.00
947,100.00 4,546,080.00
13,800.00 10,405,823.76
86,400.00 2,757,888.00
4,000.00 127,680.00
155,422,667.86
21,500.00 8,095,279.98
33,700.00 1,672,382.72
868,000.00 218,860,992.00
77,300.00 72,603,252.00
20,300.00 4,384,800.00
Harga Jumlah
Satuan (Rp.) Harga (Rp.)
21,500.00 1,795,680.00
33,700.00 472,839.08
868,000.00 52,340,400.00
77,300.00 7,583,130.00
947,100.00 11,081,070.00
13,800.00 20,574,524.88
86,400.00 7,013,952.00
4,000.00 324,720.00
406,803,022.66
Harga Jumlah
Satuan (Rp.) Harga (Rp.)
21,500.00 6,000,085.05
33,700.00 2,525,718.67
868,000.00 146,618,520.49
77,300.00 48,638,093.49
20,300.00 2,937,448.48
21,500.00 1,411,346.00
33,700.00 368,700.47
868,000.00 46,524,800.00
77,300.00 6,740,560.00
947,100.00 9,849,840.00
13,800.00 18,288,466.56
86,400.00 6,234,624.00
4,000.00 288,640.00
296,426,843.22
JADWAL PENGGUNAAN BAHAN/MATERIAL
I PEKERJAAN PERSIAPAN
1 Papan Nama proyek 1,00 Ls
rr:509 Err:509 1,00 Err:509
rr:509 Err:509 #N/A Err:509
rr:509 Err:509 #N/A Err:509
rr:509 Err:509 #N/A Err:509
rr:509 Err:509 #N/A Err:509
4 Mobilisasi dan demobilisasi #N/A
5 Administrasi dan Dokumentasi 1,00 Ls
6 Pembuatan 1 M2 jalan sementara 200.00 m2
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
rr:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
II PEKERJAAN PERPIPAAN 0.00 0.000
Valve Ø 200 mm 4.00 m'
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
3 Pasangan Batu 1 : 4 147,16 m3
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
4 Pekerjaan Plesteran 1: 3 (Tebal 1,5 Cm) 75,85 m2
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
JADWAL PENGGUNAAN BAHAN/MATERIAL
No. URAIAN KEGIATAN JUMLAH SAT. BULAN 1 BULAN 2 BULAN 3 Ket.
(%)
1 2 3 4 5 6 7 8 9 10 11 12
5 1 M3 Beton mutu, fc=19,3Mpa (K225), SLUMP (12+2) Cm, W/C= 0,58
Err:509 Err:509 Err:509 Err:509
rr:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
6 Pembesian 1 Kg dengan Besi Beton polos 1.591,20 kg
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509
- Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
- Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
- Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
- Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
- Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
- Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
- Err:509 Err:509 Err:509
Err:509 Err:509
- Err:509 Err:509 Err:509
- Err:509 Err:509 Err:509
- Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
JADWAL PENGGUNAAN BAHAN/MATERIAL
No. URAIAN KEGIATAN JUMLAH SAT. BULAN 1 BULAN 2 BULAN 3 Ket.
(%)
1 2 3 4 5 6 7 8 9 10 11 12
- Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
- Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
- Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
- Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
- Err:509 Err:509 Err:509
Err:509 Err:509
- Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
- Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
- Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
JADWAL PENGGUNAAN BAHAN/MATERIAL
No. URAIAN KEGIATAN JUMLAH SAT. BULAN 1 BULAN 2 BULAN 3 Ket.
(%)
1 2 3 4 5 6 7 8 9 10 11 12
Err:509 Err:509 Err:509
JADWAL PENGGUNAAN BAHAN/MATERIAL
No. URAIAN KEGIATAN JUMLAH SAT. BULAN 1 BULAN 2 BULAN 3 Ket.
(%)
1 2 3 4 5 6 7 8 9 10 11 12
Err:509 Err:509
- Err:509 Err:509 Err:509
- Err:509 Err:509 Err:509
- Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
- Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
- Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
- Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
- Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509
- Err:509 Err:509 Err:509
- Err:509 Err:509 Err:509
- Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
- Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
JADWAL PENGGUNAAN BAHAN/MATERIAL
No. URAIAN KEGIATAN JUMLAH SAT. BULAN 1 BULAN 2 BULAN 3 Ket.
(%)
1 2 3 4 5 6 7 8 9 10 11 12
- Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
JADWAL PENGGUNAAN BAHAN/MATERIAL
No. URAIAN KEGIATAN JUMLAH SAT. BULAN 1 BULAN 2 BULAN 3 Ket.
(%)
1 2 3 4 5 6 7 8 9 10 11 12
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
- Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
- Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509
- Err:509 Err:509 Err:509
- Err:509 Err:509 Err:509
- Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
JADWAL PENGGUNAAN BAHAN/MATERIAL
No. URAIAN KEGIATAN JUMLAH SAT. BULAN 1 BULAN 2 BULAN 3 Ket.
(%)
1 2 3 4 5 6 7 8 9 10 11 12
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
- Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
- Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
- Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
- Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
- Err:509 Err:509 Err:509
M. Basir Yusri
Direktur
No Uraian
1 Nama Paket Pekerjaan : Perbaikan Saluran Pembuang di gampong Neuhun
2 Kode Paket : -
3 Sumber Dana : APBN Tahun Anggaran 2016
4 Nilai Paket/Nilai Pekerjaan : Rp. 1.653.000.000,-
5 Nama Kegiatan : Rehabililtasi Infrastruktur yang Rusak Akibat Benc
6 Lokasi : Aceh Besar
7 Tahun Anggaran : 2016
8 Pokja ULP : Kelompok Kerja Pekerjaan Konstruksi II Unit Layan
9 Alamat Pokja : Komplek Kantor Bupati Aceh Besar, Jalan Prof. A. M
10 Nomor Pengumuman Lelang dengan Pas :
11 Tanggal :
10 Nomor Dokumen : 01/PK-06.1/BPBD/2016
11 Tanggal : 29 Agustus 2016
12 Nomor Pada Surat Penawaran : 7/CV.PKB/IX/2016
13 Tanggal Pada Surat Penawaran : 10 Mei 2017
14 Lokasi Saat Pemasukan Penawaran : Aceh Besar
15 Nilai Penawaran : Rp 584,170,000
16 Masa Berlaku Penawaran Selama : 60 (enam puluh)
17 Berlaku Sampai dengan Tanggal : 8 Oktober 2016
Pengurus Perusahaan
1 Nama Penanggung Jawab 1 : M. Basir Yusri
2 Jabatan : Direktur
3 No. KTP : -
4 No. NPWP : -
5 Alamat : Jl. Banda Aceh - Medan Psr. Lampakuk Kec. Kuta Co
6 Besaran Saham di Perusahaan : 100%
1 Nama Penanggung Jawab 2 : -
2 Jabatan : -
3 No. KTP : -
4 No. NPWP : -
5 Alamat : -
6 Besaran Saham di Perusahaan : -
1 Nama Penanggung Jawab 3 :
2 Jabatan :
3 No. KTP :
4 No. NPWP :
5 Alamat :
6 Besaran Saham di Perusahaan :
Modal Kerja
Bank Pemberi Dukungan : PT. bank Aceh Syariah
Nomor Dukungan Bank : 3891/DB/610/VIII/2016
Lokasi/Alamat Bank : Banda Aceh
Tanggal Surat Dukungan : 16 Agustus 2016
Nilai Dukungan : Rp 170,000,000.00
Terbilang : #NAME?
Tukang Besi-
5 Jamaluddin Pelaksana Lapangan beton/barbending
DAFTAR PENGALAMAN
Ringkasan Lingkup
No. Nama Paket Sub Bidang Pekerjaan Pekerjaan
1 Rehabilitasi D.R Babah Nipah 527 Ha Sungai, Danau dan Pembangunan Embung dn
PAKAET-1 Waduk Bangunan Penampung Air
Lainnya
2 Pekerjaan Optiomalisasi
Padang Penggembalaan
Kabupaten Aceh Besar
3
n Pembuang di gampong Neuhun Kec. Mesjid Raya
-01-001898
WBIDR/WPJ.25/KP.0103/2016
no sertifikat Tanggal Sertifikat Tahun Sertifikat
- - -
2012 110 HP 1 m3
2012 110 HP 2 m3
2015 6 Ton 10 Hp
2015 4 hp 0,6 m3
2014 - 1000 m
Tahun Pembuatan Tenaga Kapasitas
2012 110 HP 1 m3
2012 110 HP 2 m3
2015 6 Ton 10 Hp
2015 4 hp 0,6 m3
2014 - 1000 m
Sekolah Teknologi
2.2031.1.056.01.261329 Sekolah Menengah
Menengah (STM)
2.2.053.3.056.01.263286 Universitas Syiah Kuala S1 Teknik Sipil
Sekolah Teknologi
2.2.012.3.056.01.268454 Sekolah Menengah
Menengah (STM)
Universitas Samudra
2.2.004.1.039.01.261375 S1 Teknik Sipil
Langsa
Universitas Iskandarmuda
2.2.003.1.102.01.264890 S1 Teknik Sipil
Banda Aceh
80 %
90 %
80 %
80 %
80 %
80 %
80 %
80 %
Persentase Kondisi Alat
80 %
90 %
80 %
80 %
80 %
80 %
80 %
80 %
1171030107 71.360.530.1-
1 Juli 1976 #VALUE! Alue Naga
760003 101.000
1174010906 16.104.671.1-
9 Mei 1983 #VALUE! Sidorejo Kota Langsa
830001 101.000
1108101303 14.954..897.6-
13 Maret 1985 #VALUE! Ds. Pante Aceh Utara
850001 101.000
B. A. Serah Terima Tahun Kontrak
31 Desember 2007 #VALUE!
Kepada Yth.
Kelompok Kerja Pekerjaan Konstruksi II Unit Layanan Pengadaan (ULP)
Kabupaten Aceh Besar
Di
Komplek Kantor Bupati Aceh Besar, Jalan Prof. A. Madjid Ibrahim, Kota Jantho
Penawaran ini sudah memperhatikan ketentuan dan persyaratan yang tercantum dalam Dokumen
Pengadaan untuk melaksanakan pekerjaan tersebut.
Penawaran ini berlaku selama 60 (enam puluh) hari kalender sejak tanggal Surat Penawaran ini.
Dengan disampaikannya Surat Penawaran ini, maka kami menyatakan sanggup dan akan tunduk pada semua
ketentuan yang tercantum dalam Dokumen Pengadaan ini.
M. Basir Yusri
Direktur
CV. TUAH SEJAHTERA
PRA-RENCANA KESELAMATAN KERJA DAN
KESEHATAN KERJA
(PRA-RK3)
1. KEBIJAKAN K3
Dengan ini menyatakan bahwa dalam melaksakan kegiatan konstruksi bila dipercaya menjadi pelaksana pekerjaan ini akan
menerapkan sistem keselamatan dan kesehatan kerja (K3) bagi semua karyawan maupun pekerja dalam melaksanakan pekerjaan
baik di lapangan maupun dikantor.
Demikian pernyataan saya ini diperbuat dengan sesungguh-sungguhnya dan akan dilaksanakan di lapangan.
2. PERENCANAAN
1) Identifikasi Bahaya dan Pengendalian Resiko Bahaya
5 Galian Tanah Pipa (AB) a) Kecelakaan ringan a) gunakan alat keselamatan kerja
→ Luka Ringan sampai berat b) gunakan rambu2 keselamatan
b) Terkena alat kerja c) gunakan perancah yang baik
→ Luka Ringan, berat, mati d) pembatasan area kerja
c) Terjatuh e) menggunakan tenaga ahli
→ Luka Ringan, berat, mati
d) kecelakaan alat berat
→ Luka Ringan, berat, mati
6 Timbunan Tanah Kembali (MP) a) Kecelakaan ringan a) gunakan alat keselamatan kerja
→ Luka Ringan sampai berat b) gunakan rambu2 keselamatan
b) Terkena alat kerja c) gunakan perancah yang baik
→ Luka Ringan, berat, mati d) pembatasan area kerja
c) Terjatuh e) menggunakan tenaga ahli
→ Luka Ringan, berat, mati
d) kecelakaan alat berat
→ Luka Ringan, berat, mati
7 Pemasangan 1 m pipa PVC (AW) 0, 216 mm a) Kecelakaan ringan a) gunakan alat keselamatan kerja
→ Luka Ringan sampai berat b) gunakan rambu2 keselamatan
b) Terkena alat kerja c) gunakan perancah yang baik
→ Luka Ringan, berat, mati d) pembatasan area kerja
c) Terjatuh e) menggunakan tenaga ahli
→ Luka Ringan, berat, mati
d) kecelakaan alat berat
→ Luka Ringan, berat, mati
8 Pemasangan 1 buah ELBOW 45° PVC (AW) 0,216 mm a) Kecelakaan ringan a) gunakan alat keselamatan kerja
→ Luka Ringan sampai berat b) gunakan rambu2 keselamatan
b) Terkena alat kerja c) gunakan perancah yang baik
→ Luka Ringan, berat, mati d) pembatasan area kerja
c) Terjatuh e) menggunakan tenaga ahli
→ Luka Ringan, berat, mati
d) kecelakaan alat berat
→ Luka Ringan, berat, mati
9 Pemasangan 1 buah ELBOW 90° PVC (AW) 0,216 mm a) Kecelakaan ringan a) gunakan alat keselamatan kerja
→ Luka Ringan sampai berat b) gunakan rambu2 keselamatan
b) Terkena alat kerja c) gunakan perancah yang baik
→ Luka Ringan, berat, mati d) pembatasan area kerja
c) Terjatuh e) menggunakan tenaga ahli
→ Luka Ringan, berat, mati
d) kecelakaan alat berat
→ Luka Ringan, berat, mati
12 Galian Tanah Pipa (AB) a) Kecelakaan ringan a) gunakan alat keselamatan kerja
→ Luka Ringan sampai berat b) gunakan rambu2 keselamatan
b) Terkena alat kerja c) gunakan perancah yang baik
→ Luka Ringan, berat, mati d) pembatasan area kerja
c) Terjatuh e) menggunakan tenaga ahli
→ Luka Ringan, berat, mati
d) kecelakaan alat berat
→ Luka Ringan, berat, mati
13 Galian Tanah Biasa (AB) a) Kecelakaan ringan a) gunakan alat keselamatan kerja
→ Luka Ringan sampai berat b) gunakan rambu2 keselamatan
b) Terkena alat kerja c) gunakan perancah yang baik
→ Luka Ringan, berat, mati d) pembatasan area kerja
c) Terjatuh e) menggunakan tenaga ahli
→ Luka Ringan, berat, mati
d) kecelakaan alat berat
→ Luka Ringan, berat, mati
14 1 m3 Timbunan tanah kembali a) Kecelakaan ringan a) gunakan alat keselamatan kerja
→ Luka Ringan sampai berat b) gunakan rambu2 keselamatan
b) Terkena alat kerja c) gunakan perancah yang baik
→ Luka Ringan, berat, mati d) pembatasan area kerja
c) Terjatuh e) menggunakan tenaga ahli
→ Luka Ringan, berat, mati
d) kecelakaan alat berat
→ Luka Ringan, berat, mati
16 Pekerjaan Plesteran 1: 3 (Tebal 1,5 Cm) a) Kecelakaan ringan a) gunakan alat keselamatan kerja
→ Luka Ringan sampai berat b) gunakan rambu2 keselamatan
b) Terkena alat kerja c) gunakan perancah yang baik
→ Luka Ringan, berat, mati d) pembatasan area kerja
c) Terjatuh e) menggunakan tenaga ahli
→ Luka Ringan, berat, mati
d) kecelakaan alat berat
→ Luka Ringan, berat, mati
17 1 M3 Beton mutu, fc=19,3Mpa (K225), SLUMP (12+2) Cm,a) Kecelakaan ringan a) gunakan alat keselamatan kerja
→ Luka Ringan sampai berat b) gunakan rambu2 keselamatan
b) Terkena alat kerja c) gunakan perancah yang baik
→ Luka Ringan, berat, mati d) pembatasan area kerja
c) Terjatuh e) menggunakan tenaga ahli
→ Luka Ringan, berat, mati
d) kecelakaan alat berat
→ Luka Ringan, berat, mati
18 Pembesian 1 Kg dengan Besi Beton polos a) Kecelakaan ringan a) gunakan alat keselamatan kerja
→ Luka Ringan sampai berat b) gunakan rambu2 keselamatan
b) Terkena alat kerja c) gunakan perancah yang baik
→ Luka Ringan, berat, mati d) pembatasan area kerja
c) Terjatuh e) menggunakan tenaga ahli
→ Luka Ringan, berat, mati
d) kecelakaan alat berat
→ Luka Ringan, berat, mati
19 Pintu Air 1 As Draf ( Gear ) Daun Pintu Plat B=50 a) Kecelakaan ringan a) gunakan alat keselamatan kerja
→ Luka Ringan sampai berat b) gunakan rambu2 keselamatan
b) Terkena alat kerja c) gunakan perancah yang baik
→ Luka Ringan, berat, mati d) pembatasan area kerja
c) Terjatuh e) menggunakan tenaga ahli
→ Luka Ringan, berat, mati
d) kecelakaan alat berat
→ Luka Ringan, berat, mati
20 Pemasangan Pipa Drain Hole pvc 0 2” a) Kecelakaan ringan a) gunakan alat keselamatan kerja
→ Luka Ringan sampai berat b) gunakan rambu2 keselamatan
b) Terkena alat kerja c) gunakan perancah yang baik
→ Luka Ringan, berat, mati d) pembatasan area kerja
c) Terjatuh e) menggunakan tenaga ahli
→ Luka Ringan, berat, mati
d) kecelakaan alat berat
→ Luka Ringan, berat, mati
23 Galian Tanah Biasa (AB) a) Kecelakaan ringan a) gunakan alat keselamatan kerja
→ Luka Ringan sampai berat b) gunakan rambu2 keselamatan
b) Terkena alat kerja c) gunakan perancah yang baik
→ Luka Ringan, berat, mati d) pembatasan area kerja
c) Terjatuh e) menggunakan tenaga ahli
→ Luka Ringan, berat, mati
d) kecelakaan alat berat
→ Luka Ringan, berat, mati
25 Pekerjaan Plesteran 1: 3 (Tebal 1,5 Cm) a) Kecelakaan ringan a) gunakan alat keselamatan kerja
→ Luka Ringan sampai berat b) gunakan rambu2 keselamatan
b) Terkena alat kerja c) gunakan perancah yang baik
→ Luka Ringan, berat, mati d) pembatasan area kerja
c) Terjatuh e) menggunakan tenaga ahli
→ Luka Ringan, berat, mati
d) kecelakaan alat berat
→ Luka Ringan, berat, mati
26 1 M3 Beton mutu, fc=19,3Mpa (K225), SLUMP (12+2) Cm,a) Kecelakaan ringan a) gunakan alat keselamatan kerja
→ Luka Ringan sampai berat b) gunakan rambu2 keselamatan
b) Terkena alat kerja c) gunakan perancah yang baik
→ Luka Ringan, berat, mati d) pembatasan area kerja
c) Terjatuh e) menggunakan tenaga ahli
→ Luka Ringan, berat, mati
d) kecelakaan alat berat
→ Luka Ringan, berat, mati
27 Pembesian 1 Kg dengan Besi Beton polos a) Kecelakaan ringan a) gunakan alat keselamatan kerja
→ Luka Ringan sampai berat b) gunakan rambu2 keselamatan
b) Terkena alat kerja c) gunakan perancah yang baik
→ Luka Ringan, berat, mati d) pembatasan area kerja
c) Terjatuh e) menggunakan tenaga ahli
→ Luka Ringan, berat, mati
d) kecelakaan alat berat
→ Luka Ringan, berat, mati
3 Pemenuhan Perundang - undangan dan Persyaratan Lainnya
Daftar peraturan perundang-undangan dan persyaratan K3 yang wajib dipunyai dan dipenuhi dalam melaksakan paket pekerjaan ini
adalah:
a) UU No 1 Tahun 1970 tentang Keselamatan Kerja UU No. 18. Tahun 1999 tentang Jasa Konstruksi.
b) Peraturan Menteri PU No. 09/PRT/M/2008 tentang Pedoman Sistem Manajemen Keselamatan dan Kesehatan Kerja (SMK3)
c) Konstruksi Bidang PU.
d) UU No 1 Tahun 1970 tentang Keselamatan Kerja
e) Peraturan
UU No. 18 Menteri
Tahun 1999 tentang
PU No. Jasa Konstruksi
09/PRT/M/2008 tentang Pedoman Sistem Manajemen
f) Keselamatan dan Kesehatan Kerja (SMK3) Konstruksi Bidang PU.
g) Keputusan Bersama DEPNAKERTRANS dan Departemen Pekerjaan Umum No.
h) 174 TahunMenteri
Peraturan 1986 dari Menteri
Tenaga Tenaga
Kerja Kerja Dan Menteri
PER/01/MEN/1980 Pekerjaan
tentang K3 dalamUmum
tentang
konstruksikeselamatan
bangunan. dan kesehatan kerja dalam pekerjaan konstruksi.
i) Peraturan Menteri Tenaga Kerja PER/03/MEN/1978 mengenai syarat - syarat
j) pengangkatan
Peraturan MenteridanTenaga
tanggung jawab
Kerja petugas
No. 1 (1978),dan tenaga ahli keselamatan
PER/01/MEN/1978, tentang K3
kerja
disektor kehutanan, penebangan pohon, transportasi, kayu kolondongan,
4. perlengkapan,
Sasaran K3 dan pertolongan
Programpertama,
K3 dan untuk pencahayaan untuk kerja
a) malam.
Sasaran K3 :
a. Tidak ada kecelakan kerja yang berdampak korban jiwa (Zero Fatal Accident)
b. Tingkatpekerja
c. Semua penerapan elemen
wajib memakaiSMK3
APDminimal 80 % bahaya dan risiko pekerjaannya
yang sesuai
masing-masing
d. Mengurangi tingkat biaya pengeluaran yang disebabkan oleh kecelakaan kerja
b. Melakukan inspeksi secara rutin terhadap kondisi dan cara kerja berbahaya
c.
d. Memastikan
Pengendaliansemua
risiko pekerja untuk
yang timbul mematuhi
dengan peraturan yang
memperhatikan telahnilai
besaran ditetapkan
risiko/
tahapan pengendalian risiko
C) Organisasi K3 :
PERUSAHAAN
DEWAN KEPALA K3
PROJECT CONTROL
Pekerja
e) Simbol - simbol K3
KHALIDI
Direktur
JADWAL WAKTU PELAKSANAAN (KURVA S)
Kegiatan 0 : Rehabilitasi dan Peningkatan Jaringan Irigasi
Pekerjaan 0 : Peningkatan Jaringan D.I. Mon Abeuk (DAK Penugasan)
Lokasi : Kec. Kuta Cot Glie/Kab. Aceh Besar.
Tahun Anggaran : 2018
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
4 Mobilisasi dan demobilisasi 1,00 Ls 6,000,000 #VALUE! #VALUE! 0.377 0.377 0.377
84.76
5 Administrasi dan Dokumentasi 1,00 Ls 1,500,000 #VALUE! #VALUE! 0.056 0.056 0.056 0.056 0.056
II PEKERJAAN PERPIPAAN
75.55
1 Galian Tanah Pipa (AB) 402,00 m3 36,487 #VALUE! #VALUE! 1.381 1.381
2 Timbunan Tanah Kembali (MP) 102,04 m3 32,307 #VALUE! #VALUE! 0.310 0.310
4 Pemasangan 1 m pipa PVC (AW) 0, 216 mm 768,00 m 183,751 #VALUE! #VALUE! 5.315 5.315 5.315 5.315 5.315
66.34
6 Pemasangan 1 buah ELBOW 45° PVC (AW) 0,216 mm 6,00 bh 1,249,006 #VALUE! #VALUE! 1.411
7 Pemasangan 1 buah ELBOW 90° PVC (AW) 0,216 mm 6,00 bh 1,249,006 #VALUE! #VALUE! 1.411
1 Galian Tanah Biasa (AB) 366,80 m3 36,487 #VALUE! #VALUE! 1.260 1.260 49.22
47.44
2 1 m3 Timbunan tanah kembali 150,00 m3 32,307 #VALUE! #VALUE! 0.913 45.68
3 Pasangan Batu 1 : 4 147,16 m3 830,307 #VALUE! #VALUE! 3.287 3.287 3.287 3.287 3.287 3.287 3.287 43.04
4 Pekerjaan Plesteran 1: 3 (Tebal 1,5 Cm) 75,85 m2 175,114 #VALUE! #VALUE! 1.251 1.251
38.46
5 1 M3 Beton mutu, fc=19,3Mpa (K225), SLUMP (12+2) Cm, W/C= 0,58 27,40 m3 866,297 #VALUE! #VALUE! 4.470
6 Pembesian 1 Kg dengan Besi Beton polos 1.591,20 kg 13,256 #VALUE! #VALUE! 3.972
33.18
7 Pintu Air 1 As Draf ( Gear ) Daun Pintu Plat B=50 2,00 Unit 7,000,000 #VALUE! #VALUE! 2.636
28.65
8 Pemasangan Pipa Drain Hole pvc 0 2” 40,00 m' 19,134 #VALUE! #VALUE! 0.144
25.36
9 Bekisting 2,40 m2 117,169 #VALUE! #VALUE! 0.053
22.07
10 Membongkar Bekisting 2,40 m2 3,916 #VALUE! #VALUE! 0.002
18.78
IV PEKERJAAN SALURAN
15.50
1 Galian Tanah Biasa (AB) 58,27 m3 36,487 #VALUE! #VALUE! 0.400
12.21
2 1 m3 Timbunan tanah kembali 76,76 m3 32,307 #VALUE! #VALUE! 0.467
3 Pasangan Batu 1 : 4 66,00 m3 830,307 #VALUE! #VALUE! 8.78 2.580 2.580 2.580 2.580
6.61
4 Pekerjaan Plesteran 1: 3 (Tebal 1,5 Cm) 120,00 m2 175,114 #VALUE! #VALUE! 1.319 1.319 1.319
3.27
5 1 M3 Beton mutu, fc=19,3Mpa (K225), SLUMP (12+2) Cm, W/C= 0,58 3,00 m3 866,297 #VALUE! #VALUE! 0.489
0.00 0.15
6 Pembesian 1 Kg dengan Besi Beton polos 210,00 kg 13,256 #VALUE! #VALUE! 0.524 0
RENCANA KEMAJUAN PEKERJAAN MINGGUAN (%) 0.15 3.12 3.34 2.17 3.43 3.29 3.29 3.29 3.29 3.29 4.54 5.28 4.58 2.64 1.76 1.78 6.09 11.03 9.21 9.21 9.21 5.53 0.06 0.43
RENCANA KEMAJUAN PEKERJAAN KUMULATIF (%) - 0.15 3.27 6.61 8.78 12.21 15.50 18.78 22.07 25.36 28.65 33.18 38.46 43.04 45.68 47.44 49.22 55.31 66.34 75.55 84.76 93.98 99.51 99.57 100.00
KHALIDI
Direktur
ANALISA TEKNIS
I PEKERJAAN PERSIAPAN
1 Papan Nama proyek Analisa = Ls
Volume Pekerjaan a = 1.00 Ls
Waktu taksiran yang Dibutuhkan b = 7.00 hari ~ 1.00 Minggu
2 Uitzet/Profil Analisa = Ls
Volume Pekerjaan a = 1.00 Ls
Waktu taksiran yang Dibutuhkan b = 7.00 hari ~ 1.00 Minggu
II PEKERJAAN PERPIPAAN
1 Galian Tanah Biasa (AB) Analisa = TM.04.a.1
Volume Pekerjaan a = 402,00 m3
Faktor/Kemampuan Tenaga Kerja/Peralatan b = 0.0317 Peralatan/Jam
Kapasitas Tenaga Kerja perjam c = 31.55 m3/peralatan/jam
Kapasitas Tenaga Kerja perhari c = 220.82 M3/peralatan/hari
Jumlah Tenaga Kerja yang Dipakai d = 1.00 alat
Waktu yang Dibutuhkan e = (axb)/d = 12.74 hari = 13.00 hari ~ 2.00 minggu
Alat Yang Digunakan
1 Excavator = 1.00 Unit
5 1 M3 Beton mutu, fc=19,3Mpa (K225), SLUMP (12+2) Cm, W/C= 0,58 Analisa = B.07.b ( Menggunakan
molen)
Volume Pekerjaan a = 27,40 m3
Faktor/Kemampuan Tenaga Kerja/Peralatan b = 1.3400 OH
Kapasitas Tenaga Kerja perhari c = 0.75 m3/orang/hari
Jumlah Tenaga Kerja yang Dipakai d = 8.00 orang = 2 Kelompok @ 4.00 orang
Waktu yang Dibutuhkan e = (axb)/d = 4.59 hari = 5.00 hari ~ 1.00 minggu
Bahan Yang Digunakan
1 Semen @ 1 Kg 8.80 = 241.12 Zak
2 Pasir Pasang 0.52 = 14.30 m3
3 Kerikil 0.76 = 20.93 m3
4 Air 215.00 = 5891.00 Ltr
Alat Yang Digunakan
1 Molen 0,35 m3 0.25 = 6.85 Sewa - Hari
B.07.b ( Menggunakan
5 1 M3 Beton mutu, fc=19,3Mpa (K225), SLUMP (12+2) Cm, W/C= 0,58 Analisa =
molen)
Volume Pekerjaan a = 3,00 m3
Faktor/Kemampuan Tenaga Kerja/Peralatan b = 1.5120 OH
Kapasitas Tenaga Kerja perhari c = 0.66 m3/orang/hari
Jumlah Tenaga Kerja yang Dipakai d = 8.00 orang = 2 Kelompok @ 4.00 orang
Waktu yang Dibutuhkan e = (axb)/d = 0.57 hari = 1.00 hari ~ 1.00 minggu
Bahan Yang Digunakan
1 Semen @ 1 Kg 8.80 = 26.40 Zak
2 Pasir Pasang 0.52 = 1.57 m3
3 Kerikil 0.76 = 2.29 m3
4 Air 215.00 = 645.00 Ltr
Alat Yang Digunakan
1 Molen 0,35 m3 0.25 = 0.75 Sewa - Hari
KHALIDI
Direktur
ANALISA HARGA SATUAN PEKERJAAN
Sub Jumlah A
B Bahan
1. Sirtu m3 0.20 100,000.00
Sub Jumlah B
C Peralatan
Sub Jumlah C
D Sub Jumlah (A + B + C)
E Overhead + Profit 10% x Sub Jumlah (D)
Jumlah Harga = (D + E)
Harga Satuan Pekerjaan (Dibulatkan)
AAN
Jumlah Harga
(Rp.)
80,000.00
450.00
80,450.00
20,000.00
20,000.00
0.00
100,450.00
10,045.00
110,495.00
110,495.00
ANALISA HARGA SATUAN PEKERJAAN
Sub Jumlah A
B Bahan
Sub Jumlah B
C Peralatan
1 Excavator Jam 0.0317 589,604.54
Sub Jumlah C
D Sub Jumlah (A + B + C)
E Overhead + Profit 10% x Sub Jumlah (D)
Jumlah Harga = (D + E)
Harga Satuan Pekerjaan (Dibulatkan)
AAN
Jumlah Harga
(Rp.)
13,040.0000
1,440.0000
14,480.00
0.00
18,690.4638
18,690.46
33,170.46
3,317.05
36,487.51
36,487.00
ANALISA HARGA SATUAN PEKERJAAN
Sub Jumlah A
B Bahan
Sub Jumlah B
C Peralatan
Sub Jumlah C
D Sub Jumlah (A + B + C)
E Overhead + Profit 10% x Sub Jumlah (D)
Jumlah Harga = (D + E)
Harga Satuan Pekerjaan (Dibulatkan)
AAN
Jumlah Harga
(Rp.)
26,400.00
2,970.00
29,370.00
0.00
0.00
29,370.00
2,937.00
32,307.00
32,307.00
ANALISA HARGA SATUAN PEKERJAAN
Sub Jumlah A
B Bahan
1. Pipa PVC Ø 200 mm m' 1.0000 141,666.67
2.
3.
Sub Jumlah B
C Peralatan
Sub Jumlah C
D Sub Jumlah (A + B + C)
E Overhead + Profit 10% x Sub Jumlah (D)
Jumlah Harga = (D + E)
Harga Satuan Pekerjaan (Dibulatkan)
AAN
Jumlah Harga
(Rp.)
15,120.00
8,550.00
1,710.00
25,380.00
141,666.67
141,666.67
0.00
167,046.67
16,704.67
183,751.33
183,751.00
ANALISA HARGA SATUAN PEKERJAAN
Sub Jumlah A
B Bahan
1. Elbow Ø 200 mm Bh/Taksir 1.0000 1,100,000.00
2.
3.
Sub Jumlah B
C Peralatan
Sub Jumlah C
D Sub Jumlah (A + B + C)
E Overhead + Profit 10% x Sub Jumlah (D)
Jumlah Harga = (D + E)
Harga Satuan Pekerjaan (Dibulatkan)
AAN
Jumlah Harga
(Rp.)
17,280.00
16,200.00
1,980.00
35,460.00
1,100,000.00
1,100,000.00
0.00
1,135,460.00
113,546.00
1,249,006.00
1,249,006.00
ANALISA HARGA SATUAN PEKERJAAN
Sub Jumlah A
B Bahan
1. Valve Ø 200 mm m' 1.0000 5,000,000.00
2.
3.
Sub Jumlah B
C Peralatan
Sub Jumlah C
D Sub Jumlah (A + B + C)
E Overhead + Profit 10% x Sub Jumlah (D)
Jumlah Harga = (D + E)
Harga Satuan Pekerjaan (Dibulatkan)
AAN
Jumlah Harga
(Rp.)
137,120.00
77,130.00
15,390.00
229,640.00
5,000,000.00
5,000,000.00
0.00
5,229,640.00
522,964.00
5,752,604.00
5,752,604.00
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : 1 M3 Pasangan Batu dengan Mortal tipe N (setara campuran 1Pc : 4PP)
Satuan/Unit : m3
Analisa : P.01.c.1 (Manual)
Sub Jumlah B
C Peralatan
1.
Sub Jumlah C
D Sub Jumlah (A + B + C)
E Overhead + Profit 10% x Sub Jumlah (D)
Jumlah Harga = (D + E)
Harga Satuan Pekerjaan (Dibulatkan)
AAN
Jumlah Harga
(Rp.)
216,000.00
81,000.00
8,550.00
24,300.00
329,850.00
144,000.00
65,000.00
215,975.00
424,975.00
0.00
754,825.00
75,482.50
830,307.50
830,307.00
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Plasteran tebal 1,5 cm dengan mortal tipe S ( setandar campuran 1PC : 3 PP )
Satuan/Unit : m2
Analisa : P.04.e
Sub Jumlah B
C Peralatan
Sub Jumlah C
D Sub Jumlah (A + B + C)
E Overhead + Profit 10% x Sub Jumlah (D)
Jumlah Harga = (D + E)
Harga Satuan Pekerjaan (Dibulatkan)
AAN
ar campuran 1PC : 3 PP )
Jumlah Harga
(Rp.)
30,720.00
17,280.00
1,805.00
1,710.00
51,515.00
4,860.00
102,820.00
107,680.00
0.00
159,195.00
15,919.50
175,114.50
175,114.00
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : 1 M3 beton mutu, f'c =19,3 Mpa ( K225 ), Slump ( 12+ 2 ) cm, w/c = 0,58
Satuan/Unit : m3
Analisa : B.07.b ( Menggunakan molen)
Sub Jumlah B
C Peralatan
1. Molen 0,35 m3 Sewa - Hari 0.2500 183,041.38
Sub Jumlah C
D Sub Jumlah (A + B + C)
E Overhead + Profit 10% x Sub Jumlah (D)
Jumlah Harga = (D + E)
Harga Satuan Pekerjaan (Dibulatkan)
AAN
Jumlah Harga
(Rp.)
63,180.00
14,288.40
2,123.82
12,830.40
92,422.62
466,400.00
65,250.00
106,960.00
10,750.00
649,360.00
45,760.35
45,760.35
787,542.97
78,754.30
866,297.26
866,297.00
ANALISA HARGA SATUAN PEKERJAAN
Sub Jumlah B
C Peralatan
Sub Jumlah C
D Sub Jumlah (A + B + C)
E Overhead + Profit 10% x Sub Jumlah (D)
Jumlah Harga = (D + E)
Harga Satuan Pekerjaan (Dibulatkan)
AAN
Jumlah Harga
(Rp.)
560.00
630.00
66.50
63.00
1,319.50
10,500.00
231.75
10,731.75
0.00
12,051.25
1,205.13
13,256.38
13,256.00
ANALISA HARGA SATUAN PEKERJAAN
Sub Jumlah A
B Bahan
1. Pipa PVC Dia. 1,0" @ 6,0 m' m' 0.5000 17,250.00
2. Kerikil m3 0.0180 140,000.00
3. Ijuk Kg 0.1000 18,000.00
Sub Jumlah B
C Peralatan
Sub Jumlah C
D Sub Jumlah (A + B + C)
E Overhead + Profit 10% x Sub Jumlah (D)
Jumlah Harga = (D + E)
Harga Satuan Pekerjaan (Dibulatkan)
AAN
Jumlah Harga
(Rp.)
4,000.00
450.00
4,450.00
8,625.00
2,520.00
1,800.00
12,945.00
0.00
17,395.00
1,739.50
19,134.50
19,134.00
ANALISA HARGA SATUAN PEKERJAAN
Sub Jumlah B
C Peralatan
Sub Jumlah C
D Sub Jumlah (A + B + C)
E Overhead + Profit 10% x Sub Jumlah (D)
Jumlah Harga = (D + E)
Harga Satuan Pekerjaan (Dibulatkan)
AAN
eks 12 mm
Jumlah Harga
(Rp.)
19,200.00
10,800.00
1,140.00
1,920.00
33,060.00
38,570.00
28,440.00
5,448.00
1,000.00
73,458.00
0.00
106,518.00
10,651.80
117,169.80
117,169.00
ANALISA HARGA SATUAN PEKERJAAN
Sub Jumlah A
B Bahan
Sub Jumlah B
C Peralatan
Sub Jumlah C
D Sub Jumlah (A + B + C)
E Overhead + Profit 10% x Sub Jumlah (D)
Jumlah Harga = (D + E)
Harga Satuan Pekerjaan (Dibulatkan)
AAN
Jumlah Harga
(Rp.)
3,200.00
360.00
3,560.00
0.00
0.00
3,560.00
356.00
3,916.00
3,916.00
RENCANA ANGGARAN
1 2
I PEKERJAAN PERSIAPAN
2 Uitzet/Profil
3 Pembersihan Lapangan
4 Mobilisasi dan demobilisasi
5 Administrasi dan Dokumentasi
II PEKERJAAN PERPIPAAN
IV PEKERJAAN SALURAN
AK Penugasan)
3 4 5 6
Ls Ls 500,000.00
1,00
Ls Ls 1,500,000.00
1,00
Ls Ls 2,000,000.00
1,00
Ls 1,00 Ls 6,000,000.00
Ls 1,00 Ls 1,500,000.00
B.07.b ( Menggunakan
27,40 m3 866,297.00
molen)
Jumlah
PPN 10%
TOTAL
DIBULATKAN
Jumlah Harga (Rp.)
500,000.00
1,500,000.00
#VALUE!
#VALUE!
#VALUE!
22,099,000.00
33,599,000.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
198,083,636.28
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
213,585,305.62
2,126,097.49
2,479,885.32
#VALUE!
#VALUE!
#VALUE!
#VALUE!
85,802,575.81
531,070,517.71
53,107,051.77
584,177,569.48
584,170,000.00
REKAPITULASI RENCANA ANGGARAN BIAYA
I PEKERJAAN PERSIAPAN
PEMBULATAN
Terbilang : Lima Ratus Delapan Puluh Empat Juta Seratus Tujuh Puluh Ribu Rupiah.
KHALIDI
Direktur
GARAN BIAYA
33,599,000.00
198,083,636.28
213,585,305.62
85,802,575.81
531,070,517.71
53,107,051.77
584,177,569.48
584,170,000.00
23 Buis Beton Ø 40 cm Bh
24 Buis Beton Ø 60 cm Bh
25 Buis Beton Ø 80 cm Bh
26 Batang Kelapa ( Pjg. 4 m' ) M'
27 Bitumen Geomembrane M2
28 Cat Kayu Dasar Kg
29 Cat Dasar Tembok/Sealer Setara Vinilex Kg
30 Cat Kayu Mengkilat Kg
31 Cat Menie Besi Kg
32 Cat Tembok Kg
33 Geotextile Non Woven (SNI) M2
KELOMPOK NO JENIS PEKERJA/KEAHLIAN SATUAN
PEKERJAAN
34 Gemok / Grease Kg
35 Ijuk Kg
36 Karung Plastik Bh
37 Kayu Bakau/Kayu Keras L =. 4 m' Btg
38 Kawat Beton/Kawat Ikat Kg
39 Kawat Bronjong Ø 3 mm Kg
40 Kayu Kelas I (seumantok/Ulin/dll) M3
41 Kayu Kelas II (Kamper/Kruing/dll) M3
42 Kayu Kelas III (Borneo/dll) M3
43 Kayu Kelas IV ( Sengon / dll ) M3
44 Kerikil tersaring M3
45 Kertas Amplas Lbr
46 Kerikil M3
47 Pasir Beton M3
48 Pasir Beton (1,35 ton/m3) Kg
49 Lempengan Rumput M2
50 Minyak Cat (tinner) Kg
51 Multipleks 3 mm Lbr
52 Multipleks 4 mm Lbr
53 Multipleks 6 mm Lbr
54 Multipleks 12 mm Lbr
55 Minyak Tanah /Kerosen ( Industri ) Ltr
56 Minyak Bekisting Ltr
57 Paku Beton Kotak
58 Paku Kayu Kg
59 Pasir Pasang M3
60 Pasir Pasang (1,4 ton/m3) Kg
61 Pasir Urug M3
62 Pelumas / Oli Ltr
63 Pipa PVC Ø 1/2 " Btg
64 Pipa PVC Ø 3/4 " Btg
65 Pipa PVC Ø 1" Btg
66 Pipa PVC Ø 1 1/2 " Btg
67 Pipa PVC Ø 2 " Btg
68 Pipa PVC Ø 3 " AW ( SNI ) Btg
69 Pipa PVC Ø 4 " AW ( SNI ) Btg
70 Pipa PVC Ø 6 " AW ( SNI ) Btg
71 Pipa PVC Ø 8 " AW ( SNI ) Btg
71 Elbow Ø 200 mm ( SNI ) Bh
72 Semen/PC ( 40 Kg ) Zak
73 Semen/PC ( 1 Kg ) Kg
74 Semen/PC ( 50 Kg ) Zak
75 Semen/PC ( 1 Kg ) Kg
76 Semen Putih ( 50 Kg ) Zak
77 Semen Putih ( 1 Kg ) Kg
78 Solar (Industri) Ltr
KELOMPOK NO JENIS PEKERJA/KEAHLIAN SATUAN
PEKERJAAN
79 Sirtu M3
80 Tali Rapia M'
81 Tanah Timbun M3
82 Tanah Timbun Pilihan M3
KELOMPOK NO JENIS PEKERJA/KEAHLIAN SATUAN
PEKERJAAN
PINTU AIR 1 Pintu Air 2 As Draf ( Gear ) Daun Pintu Plat Per.Unit
B H HT
100 130 430 Unit
110 140 440 Unit
120 150 450 Unit
130 160 460 Unit
140 170 470 Unit
150 180 480 Unit
2 Pintu Air 1 As Draf ( Gear ) Daun Pintu Plat Per.Unit
B H HT
100 110 300 Unit
105 120 360 Unit
110 130 390 Unit
115 140 420 Unit
120 150 450 Unit
3 Pintu Air 2 As Draf ( Gear ) Daun Pintu Plat Per.Unit
B H HT
30 40 250 Unit
40 50 270 Unit
50 60 290 Unit
60 70 310 Unit
70 90 330 Unit
KHALIDI
Direktur
ATAN
nugasan)
HARGA
90,000.00
90,000.00
95,000.00
80,000.00
18,000.00
12,500.00
17,000.00
12,500.00
20,000.00
80,000.00
50.00
42,700.00
250,000.00
225,000.00
200,000.00
700.00
120,000.00
120,000.00
120,000.00
120,000.00
120,000.00
120,000.00
120,000.00
800.00
2,800.00
4,800.00
11,500.00
10,000.00
12,700.00
10,900.00
380,000.00
480,000.00
HARGA
140,000.00
152,000.00
160,000.00
75,000.00
346,000.00
37,500.00
54,000.00
78,500.00
31,200.00
32,300.00
30,000.00
HARGA
42,000.00
18,000.00
1,500.00
50,000.00
15,450.00
27,500.00
5,350,000.00
4,000,000.00
3,160,000.00
2,500,000.00
165,000.00
4,000.00
140,000.00
140,000.00
103.70
36,000.00
25,000.00
75,000.00
95,000.00
107,000.00
190,000.00
11,500.00
5,000.00
19,000.00
22,700.00
125,000.00
89.29
138,000.00
55,700.00
54,000.00
40,400.00
103,500.00
127,000.00
164,450.00
169,950.00
287,000.00
654,000.00
850,000.00
1,100,000.00
53,000.00
1,325.00
78,700.00
1,574.00
156,900.00
3,138.00
10,200.00
HARGA
100,000.00
50.00
60,000.00
159,800.00
HARGA
78,000,000.00
79,000,000.00
80,200,000.00
82,100,000.00
83,500,000.00
85,000,000.00
47,000,000.00
48,000,000.00
49,000,000.00
50,000,000.00
51,000,000.00
30,000,000.00
31,000,000.00
32,000,000.00
33,000,000.00
33,300,000.00
589,604.54
661,559.85
422,840.99
346,206.81
332,264.15
200,000.00
22,880.17
183,041.38
50,184.35
573,436.28
464,646.90
47,446.70
328,865.50
38,430.17
100,000.00
200,000.00
16 Mei 2018
EJAHTERA
HARGA
JAD
VOLUME SAT
URAIAN PEKERJAAN
NO.
BULAN KE I BULAN KE
1 2 3 4 5
8 Multipleks 12 mm 0.49 m3
12 Sirtu 40.00 m3
13 Ijuk 4.00 Kg
6 7 8 9 10 11 12 13 14 15 16 17
Aceh Besar, 16 Mei 2018
CV. TUAH SEJAHTERA
KHALIDI
Direktur
KET.
BULAN KE V BULAN KE VI
18 19 20 21 22 23 24
ANALISA HARGA SATUAN PEKERJAAN ( AHSP )
Jenis Pekerjaan : 1 M3 Beton mutu, f'c=16,9 Mpa (K200), slump (12+2) cm, w/c=0,61
Satuan/Unit : M3
Analisa : B.06.a ( Manual )
Sub Jumlah C
D Sub Jumlah (A + B + C)
E Overhead + Profit 15% x Sub Jumlah (D)
Jumlah Harga = (D + E)
Harga Satuan Pekerjaan (Dibulatkan)
* Jika menggunakan bahan additif, maka digunakan bahan additif 1,2 ltr/m3 beton
JUMLAH HARGA
(Rp.)
(6)=(4)x(5)
132,000.00
24,750.00
2,660.00
14,850.00
174,260.00
466,400.00
65,267.86
106,918.52
10,750.00
649,336.38
0.00
823,596.38
123,539.46
947,135.83
947,100.00
Sub Jumlah B
C Peralatan
Sub Jumlah C
D Sub Jumlah (A + B + C)
E Overhead + Profit 15% x Sub Jumlah (D)
Jumlah Harga = (D + E)
Harga Satuan Pekerjaan (Dibulatkan)
(6)=(4)x(5)
560.00
630.00
66.50
63.00
1,319.50
10,500.00
231.75
10,731.75
0.00
12,051.25
1,807.69
13,858.94
13,800.00
Jenis Pekerjaan : Bekisting untuk permukaan beton biasa dengan papan uk. 3/20 cm
Satuan/Unit : m2
Analisa : B.22.a
Sub Jumlah B
C Peralatan
Sub Jumlah C
D Sub Jumlah (A + B + C)
E Overhead + Profit 15% x Sub Jumlah (D)
Jumlah Harga = (D + E)
Asumsi 3x Pakai
Harga Satuan Pekerjaan (Dibulatkan)
(6)=(4)x(5)
48,000.00
27,000.00
2,850.00
5,400.00
83,250.00
88,480.00
42,660.00
9,080.00
2,000.00
142,220.00
0.00
225,470.00
33,820.50
259,290.50
86,430.17
86,400.00
Sub Jumlah A
B Bahan
Sub Jumlah B
C Peralatan
Sub Jumlah C
D Sub Jumlah (A + B + C)
E Overhead + Profit 15% x Sub Jumlah (D)
Jumlah Harga = (D + E)
Harga Satuan Pekerjaan (Dibulatkan)
(6)=(4)x(5)
3,200.00
360.00
3,560.00
0.00
0.00
3,560.00
534.00
4,094.00
4,000.00
Jenis Pekerjaan : Bekisting untuk permukaan beton biasa dengan papan uk. 3/20 cm
Satuan/Unit : m2
Analisa : B.22
Sub Jumlah B
C Peralatan
Sub Jumlah C
D Sub Jumlah (A + B + C)
E Overhead + Profit 15% x Sub Jumlah (D)
Jumlah Harga = (D + E)
Harga Satuan Pekerjaan (Dibulatkan)
JUMLAH HARGA
(Rp.)
(6)=(4)x(5)
48,000.00
27,000.00
2,850.00
5,400.00
83,250.00
88,480.00
42,660.00
9,080.00
2,000.00
142,220.00
0.00
225,470.00
33,820.50
259,290.50
259,200.00
Jenis Pekerjaan : 1 M3 Beton mutu, f'c=21,7 Mpa (K250) kedap air, slump (12+2) cm, w/c=0,56
Satuan/Unit : M3
Analisa : B.08.b ( Molen )
Jenis Pekerjaan : 1 Bh Kitsdam Pasir/Tanah dibungkus karung plastik (25 kg) uk. 43 x 65 cm
Satuan/Unit : Buah
Analisa : D.01.a
1 2 3 4 5 6 7 8 9
M. Basir Yusri
Direktur
STRUKTUR ORGANISASI LAPANGAN
Site Manager
Zu Irfan, ST, MT
Pelaksana Lapangan
Legiman
M. Basir Yusri
Direktur
JADWAL PENGGUNA PERSONIL INTI DAN TENAGA KERJA
PERSONIL INTI
1 Zu Irfan, ST, MT/Site Manager 1.00 Orang
TENAGA KERJA
12 Kepala Tukang ∝ Orang
13 Tukang ∝ Orang
14 Pekerja ∝ Orang
15 Mandor ∝ Orang
M. Basir Yusri
Direktur
JADWAL MOBILISASI PERSONIL DAN TENAGA KERJA
1 2 3 4 5 6 7 8 9 10 11 12
M. Basir Yusri
Direktur
DAFTAR REKAPITULASI MATA PEMBAYARAN
Kegiatan : Rehabilitasi dan Peningkatan Jaringan Irigasi
Pekerjaan : Peningkatan Jaringan D.I. Mon Abeuk (DAK Penugasan)
M. Basir Yusri
Direktur
DAFTAR 1 : MATA PEMBAYARAN UMUM
NO. URAIAN PEKERJAAN SATUAN KUANTITAS HARGA SATUAN TOTAL HARGA (Rp.)
UKURAN (Rp.)
1 2 3 5.00 6.00 7.00
I PEKERJAAN PERSIAPAN
1 Papan Nama proyek Ls 1.00 500,000.00 500,000.00
2 Direksi Kit (Sewa) Ls 1.00 2,000,000.00 2,000,000.00
3 Mobilisasi dan Demobilisasi Ls 1.00 6,000,000.00 6,000,000.00
4 Uitzet/Profil Ls 1.00 2,000,000.00 2,000,000.00
5 Pembersihan Lapangan Ls 1.00 2,000,000.00 2,000,000.00
6 Administrasi dan Dokumentasi Ls 1.00 2,000,000.00 2,000,000.00
M. Basir Yusri
Direktur
DAFTAR 2 : MATA PEMBAYARAN UTAMA
1 2 3 4 5 6
M. Basir Yusri
Direktur
DAFTAR 3 : MATA PEMBAYARAN BUKAN UTAMA
NO. URAIAN PEKERJAAN SATUAN KUANTITAS HARGA SATUAN TOTAL HARGA (Rp.)
UKURAN (Rp.)
1 2 3 5.00 6.00 7.00
Total Daftar 3 -
M. Basir Yusri
Direktur
DAFTAR USULAN PERALATAN UTAMA
Kegiatan : Rehabilitasi dan Peningkatan Jaringan Irigasi
Pekerjaan : Peningkatan Jaringan D.I. Mon Abeuk (DAK Penugasan)
1 Dump Truk 4 Unit Mitsubishi 2012 3-4 m3/110 PS Sewa Kab. Aceh Besar Baik/80 %
2 Excavator 1 Unit Hitachi 2012 1 m3/110 HP Sewa Kab. Aceh Besar Baik/90 %
3 Bulldozer 1 Unit Caterpillar 2012 2 m3/110 HP Sewa Kab. Aceh Besar Baik/80 %
4 Pompa Air 1 Unit Honda 2015 1000 ltr/m/4 hp Sewa Kab. Aceh Besar Baik/80 %
5 Mollen (Concrete Mixer) 1 Unit Tiger 2015 0,6 m3/4 hp Sewa Kab. Aceh Besar Baik/80 %
6 Generator Set 1 Unit Yanmar 2015 3000 watt/250 kva Sewa Kab. Aceh Besar Baik/80 %
7 Alat Ukur (Theodolit/water pass) 1 Unit Sokkia 2014 1000 m/- Sewa Kab. Aceh Besar Baik/80 %
M. Basir Yusri
Direktur
JADWAL PENGGUNAAN PERALATAN
1 2 3 4 5 6 7 8 9 10 11 12
M. Basir Yusri
Direktur
JADWAL MOBILISASI DAN DEMOBILISASI PERALATAN
M. Basir Yusri
Direktur
DAFTAR USULAN PERSONIL INTI
Err:509 Err:509
Kegiatan : Rehabilitasi dan Peningkatan Jaringan Irigasi
Pekerjaan : Peningkatan Jaringan D.I. Mon Abeuk (DAK Penugasan)
Err:509 Err:509
1 2 3 4 5 6 7 8 9
Ujung Pandang No. 1513/3269/TS/2002 No. 1.2.211.2.088.01.1001821
Ahli Sumber Daya Air -
1 Zu Irfan, ST, MT Site Manager S1 Teknik Sipil #VALUE!
16 Mei 1979 Muda Tanggal 1 November 2002 Tanggal 10 Februari 2014
M. Basir Yusri
Direktur
DAFTAR USULAN PERSONIL INTI PROYEK
### Err:509
Kegiatan : Rehabilitasi dan Peningkatan Jaringan Irigasi
Pekerjaan : Peningkatan Jaringan D.I. Mon Abeuk (DAK Penugasan)
### Err:509
Masa Kerja di
Pendidikan Perusahaan Pengalaman Pelaksanaan
No Nama Personil Jabatan/Posisi Alamat Tempat/Tgl Lahir Umur (Tahun) Terakhir Bidang (Tahun) Ket.
(Tahun)
1 2 3 4 5 6 7 8 9
Ujung Pandang, 16 Mei 1979
1 Zu Irfan, ST, MT Site Manager Ie Masen Kayee Adang S1 Teknik Sipil #VALUE! #VALUE!
#VALUE!
M. Basir Yusri
Direktur
DAFTAR PERALATAN UTAMA MINIMAL YANG DIBUTUHKAN
DAFTAR USULAN PERALATAN UTAMA
Err:509 Err:509
Kegiatan : Rehabilitasi dan Peningkatan Jaringan Irigasi
Pekerjaan : Peningkatan Jaringan D.I. Mon Abeuk (DAK Penugasan)
Err:509 Err:509
Status Kepemilikan
Peralatan
No Jenis Peralatan Jumlah Merk dan Type Tahun Pembuatan Tenaga Kapasitas Lokasi Alat
Peralatan
Milik Sewa
1 Dump Truk 4 Unit Mitsubishi 2012 110 PS 3-4 m3 Sewa Kab. Aceh Besar
5 Pompa Air 1 Unit Honda 2015 4 hp 1000 ltr/m Sewa Kab. Aceh Besar
6 Mollen (Concrete Mixer) 1 Unit Tiger 2015 4 hp 0,6 m3 Sewa Kab. Aceh Besar
7 Generator Set 1 Unit Yanmar 2015 250 kva 3000 watt Sewa Kab. Aceh Besar
8 Alat Ukur (Theodolit/water pass) 1 Unit Sokkia 2014 - 1000 m Sewa Kab. Aceh Besar
- - - - 0 - - -
- - - - 0 - - -
- - - - 0 - - -
M. Basir Yusri
Direktur
DAFTAR USULAN PERALATAN UTAMA
### Err:509
Kegiatan : Rehabilitasi dan Peningkatan Jaringan Irigasi
Pekerjaan : Peningkatan Jaringan D.I. Mon Abeuk (DAK Penugasan)
### Err:509
Milik Sendiri
Ukuran Kapasitas Kondisi
No Jenis Peralatan Kuantitas Merek dan Model Tahun Pembuatan atau Daya Akan Dibeli atau (Baik/Rusak) Lokasi Alat
Akan Disewa
1 Dump Truk 4 Unit Mitsubishi 2012 110 PS/3-4 m3 Sewa Baik Kab. Aceh Besar
2 Excavator 1 Unit Hitachi 2012 110 HP/1 m3 Sewa Baik Kab. Aceh Besar
3 Bulldozer 1 Unit Caterpillar 2012 110 HP/2 m3 Sewa Baik Kab. Aceh Besar
5 Pompa Air 1 Unit Honda 2015 4 hp/1000 ltr/m Sewa Baik Kab. Aceh Besar
6 Mollen (Concrete Mixer) 1 Unit Tiger 2015 4 hp/0,6 m3 Sewa Baik Kab. Aceh Besar
M. Basir Yusri
Direktur
DAFTAR USULAN PERALATAN UTAMA
### #REF!
### #REF!
KEGIATAN : REHABILILTASI INFRASTRUKTUR YANG RUSAK AKIBAT BENCANA
### #REF!
No Jenis Peralatan Jumlah Kapasitas/Daya Merk/Type Tahun Pembuatan Kondisi (%) Lokasi Saat Ini Status Kepemilikan
1 Dump Truk 4 Unit 3-4 m3/110 PS Mitsubishi 2012 Baik/80 % Kab. Aceh Besar Sewa
2 Excavator 1 Unit 1 m3/110 HP Hitachi 2012 Baik/90 % Kab. Aceh Besar Sewa
3 Bulldozer 1 Unit 2 m3/110 HP Caterpillar 2012 Baik/80 % Kab. Aceh Besar Sewa
5 Pompa Air 1 Unit 1000 ltr/m/4 hp Honda 2015 Baik/80 % Kab. Aceh Besar Sewa
6 Mollen (Concrete Mixer) 1 Unit 0,6 m3/4 hp Tiger 2015 Baik/80 % Kab. Aceh Besar Sewa
M. Basir Yusri
Direktur
REKAPITULASI PERHITUNGAN TKDN
Err:509 Err:509
Kegiatan : Rehabilitasi dan Peningkatan Jaringan Irigasi
Pekerjaan : Peningkatan Jaringan D.I. Mon Abeuk (DAK Penugasan)
Tahun Anggaran : 2018
I. BARANG
1). Material Langsung (bahan baku)
2). Peralatan Barang Jadi
Sub Total I
II. JASA
3). Menejemen proyek dan perekayasaan
4). Alat kerja/ Fasilitas kerja
5). Konstruksi dan fabrikasi
Nihil
6). Jasa umum
Sub Total II
TOTAL BIAYA ( I + II )
M. Basir Yusri
Direktur
FORMULIR REKAPITULASI PERHITUNGAN TINGKAT KOMPONEN DALAM NEGERI (TKDN)
Barang
Jasa
Formulasi Perhitungan
397,235,600 Aceh Besar, 10 Mei 2017
68%
584,170,000.00 CV. OZA KARYA
186,934,400.00
32%
584,170,000.00 M. Basir Yusri
Direktur
LAMPIRAN PENAWARAN
PENGUJIAN MUTU/TEKNIS/FUNGSI
Err:509 Err:509
Kegiatan : Rehabilitasi dan Peningkatan Jaringan Irigasi
Pekerjaan : Peningkatan Jaringan D.I. Mon Abeuk (DAK Penugasan)
Tahun Anggaran : 2018
Nihil
M. Basir Yusri
Direktur
STRUKTUR PRA RK3
PENANGGUNG JAWAB K3
Muhammad Yusuf
M. Basir Yusri
Direktur
DAFTAR BAGIAN PEKERJAAN YANG AKAN DISUB-KONTRAKKAN
Err:509 Err:509
Kegiatan : Rehabilitasi dan Peningkatan Jaringan Irigasi
Pekerjaan : Peningkatan Jaringan D.I. Mon Abeuk (DAK Penugasan)
Err:509 Err:509
No Jenis Pekerjaan yang Akan Disub-kontrakkan Volume Nilai Pekerjaan (Rp.) Keterangan
#REF!
2 #REF! #REF! #REF!
#REF!
#REF!
#REF! #REF! #REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
3 #REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
4 #REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
M. Basir Yusri
Direktur
DAFTAR BAGIAN PEKERJAAN YANG AKAN DISUB-KONTRAKKAN
Nilai Pekerjaan
No Jenis Pekerjaan yang Akan Disub-kontrakkan Volume (Rp.) Keterangan
M. Basir Yusri
Direktur
REKAPITULASI BAGIAN PEKERJAAN YANG DISUBKONTRAKKAN
KEPADA PENGUSAHA KECIL*
### #REF!
### #REF!
### #REF!
### #REF!
### #REF!
No Jenis Pekerjaan Satuan Volume Harga Satuan Jumlah Harga (Rp.) % Dari Nilai Ket.
(Rp.) Penawaran
NIHIL
*) Form ini hanya diperuntukkan bagi perusahaan dengan kualifikasi non kecil
Aceh Besar, 10 Mei 2017
CV. OZA KARYA
M. Basir Yusri
Direktur
DAFTAR USULAN PEKERJAAN YANG DISUBKONTRAKKAN
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
NIHIL
Aceh Besar, 10 Mei 2017
CV. OZA KARYA
M. Basir Yusri
Direktur
SURAT PERNYATAAN
KEBENARAN DOKUMEN
No. Telepon/Fax : -
Email : -
2. Apabila dikemudian hari ditemukan bahwa dokumen-dokumen yang telah kami berikan ternyata tidak
benar/palsu, maka kami bersedia dituntut di pengadilan negeri, dikenakan sangsi dan dimasukkan
dalam daftar hitam (black list), serta Kelompok Kerja Pekerjaan Konstruksi II Unit Layanan Pengadaan
(ULP) Kabupaten Aceh Besar menggugurkan dan dibatalkan sebagai calon pemenang pada pekerjaan
Perbaikan Saluran Pembuang di gampong Neuhun Kec. Mesjid Raya Kegiatan Rehabililtasi Infrastruktur
yang Rusak Akibat Bencana
3. Kami bersedia memberikan data apabila sewaktu-waktu panitia meminta/memerlukan dokumen asli
untuk keperluan kualifikasi.
Demikian surat Pernyataan Kebenaran Dokumen ini dibuat dengan sebenarnya untuk dipergunakan
seperlunya.
M. Basir Yusri
Direktur
SURAT PERNYATAAN
TIDAK AKAN MENGAJUKAN TUNTUTAN DALAM BENTUK APAPUN
Telepon/Fax : -
Email : -
2. Segala biaya yang telah kami keluarkan dalam rangka mempersiapkan/mengajukan penawaran
adalah menjadi tanggung jawab kami sepenuhnya.
Demikian pernyataan ini kami buat/berikan dengan penuh rasa tanggung jawab tanpa ada tekanan dari
pihak manapun.
M. Basir Yusri
Direktur
SURAT PERNYATAAN
TIDAK DALAM PENGAWASAN PENGADILAN
4. Telepon Kantor : -
5. Jabatan dalam Perusahaan : Direktur
2. Apabila dikemudian hari ditemui bahwa pernyataan yang kami berikan ternyata tidak benar, maka
kami bersedia dituntut/dikenakan sanksi dan dimasukkan pada daftar sanksi Perusahaan dan
atau dikeluarkan dari daftar Registrasi Perusahaan.
Demikian Pernyataan ini kami buat dengan penuh rasa tanggung jawab.
M. Basir Yusri
Direktur
SURAT PERNYATAAN
KINERJA BAIK DAN TIDAK MASUK DAFTAR HITAM REKANAN (BLACK LIST)
4. Telepon Kantor : -
5. Jabatan dalam Perusahaan : Direktur
Demikian Pernyataan ini kami buat/berikan dengan penuh rasa tanggung jawab tanpa adanya tekanan
dari pihak manapun.
M. Basir Yusri
Direktur
SURAT PERNYATAAN
BERSEDIA MENGGUNAKAN BAHAN BAKAR NON SUBSIDI
5. Telepon Kantor : -
2. Apabila dikemudian hari ditemui bahwa pernyataan yang kami berikan ternyata tidak benar, maka
kami bersedia dituntut/dikenakan sanksi sesuai Peraturan Perundang-undangan yang berlaku.
Demikian Pernyataan ini kami buat dengan penuh rasa tanggung jawab.
M. Basir Yusri
Direktur
DAFTAR BARANG YANG DI IMPOR
No. Jenis Barang Harga Satuan (Rp.) Jumlah Harga (Rp.) Keterangan
NIHIL
Total
M. Basir Yusri
Direktur
DAFTAR BARANG YANG DI IMPOR
NIHIL
Total Harga
M. Basir Yusri
Direktur
PAKTA INTEGRITAS
Dalam rangka pekerjaan Perbaikan Saluran Pembuang di gampong Neuhun Kec. Mesjid Raya pada Kelompok
Kerja Pekerjaan Konstruksi II Unit Layanan Pengadaan (ULP) Kabupaten Aceh Besar Sumber Dana APBN Tahun
Anggaran 2016 dengan ini menyatakan bahwa :
2. akan mengikuti proses pengadaan secara bersih, tranparan, dan profesional untuk memberikan hasil kerja
terbaik sesuai ketentuan peraturan perundang-undangan;
3. apabila melanggar hal-hal yang dinyatakan dalam PAKTA INTEGRITAS ini, bersedia menerima sanksi
administratif, menerima sanksi pencantuman dalam Daftar Hitam, digugat secara perdata dan/atau
dilaporkan secara pidana.
M. Basir Yusri
Direktur
PAKTA INTEGRITAS
1. Saya secara hukum bertindak untuk dan atas nama perusahaan berdasarkan Surat Akte Notaris
Sabaruddin Salam, SH. SpN Nomor 284 Tanggal 30 Juni 2007 dan Perubahan Akte Notaris Mukhsin, SH
Nomor Jln. Soekarno - Hatta No.. 14 Lambaro Aceh Besar Tanggal 30 April 2009;
4. Saya tidak sedang dan tidak akan terlibat pertentangan kepentingan dengan para pihak yang terkait,
langsung maupun tidak langsung dalam proses pengadaan ini;
5. Badan usaha yang saya wakili tidak masuk dalam Daftar Hitam, tidak dalam pengawasan pengadilan,
tidak pailit, dan kegiatan usahanya tidak sedang dihentikan;
6. Salah satu dan/atau semua pengurus badan usaha yang saya wakili tidak masuk dalam Daftar Hitam;
M. Basir Yusri
Direktur
ULIR ISIAN KUALIFIKASI
NTUK BADAN USAHA
s badan usaha yang saya wakili tidak masuk dalam Daftar Hitam;
A. Data Administrasi
3. Alamat Kantor Pusat : Jl. Banda Aceh - Medan Psr. Lampakuk Kec. Kuta Cot Glie.
No. Telepon :-
No. Fax :
E-mail :
KTP : -
1. M. Basir Yusri Direktur
KTP : -
2. - -
KTP : -
1. M. Basir Yusri Direktur
KTP : -
2. - -
D. Ijin Usaha
1. Nomor SIUP :-
2. Masa Berlaku Izin : - s/d -
3. Asosiasi Pemberi Izin : Kantor Pelayanan Terpadu Satu Pintu Kabupaten Aceh Besar
F. Data Keuangan
1. Susunan Kepemilikan Saham (untuk PT) /Susunan Persero (untuk CV /Firma)
1. M. Basir Yusri KTP : - Jl. Banda Aceh - Medan Psr. Lampakuk Kec. Kuta Cot
Glie. 100%
0
KTP : - -
2. - -
0
2. Pajak
1 2 3 4 5 6 7 8
1 Zu Irfan, ST, MT 16 Mei 1979 S1 Teknik Sipil Site Manager #VALUE! Ahli Sumber Daya Air - Muda #VALUE!
SKT Tukang
3 Soparidana 9 Juni 1976 Sekolah Menengah Pelaksana Lapangan #VALUE! Plesteran/Plasterarer/Solid plasterer #VALUE!
4 Efendi 18 April 1974 S1 Teknik Sipil Pelaksana Lapangan #VALUE! SKT Tukang Kayu Bekisting #VALUE!
5 Jamaluddin 9 Agustus 1975 Sekolah Menengah Pelaksana Lapangan #VALUE! Tukang Besi-beton/barbending 2015/1993
7 Muhammad Yusuf 1 Mei 1976 S1 Teknik Sipil Personil K3 #VALUE! SKA Ahli K3 Konstruksi Madya #VALUE!
9 Riza Fahmi, ST 17 September 1979 S1 Teknik Sipil Tenaga Draftman #VALUE! SKT Juru Gambar/Draftman - Sipil #VALUE!
8 Mardi Syahfutra 9 Mei 1983 S1 Teknik Sipil Tenaga Pengukuran #VALUE! SKT Juru ukur/Teknisi Survei Pemetaa #VALUE!
M. Basir Yusri
Direktur
H. Data Fasilitas /Peralatan /Perlengkapan
Kapasitas atau
No. Jenis Fasilitas /Peralatan Jumlah output pada saat Merk dan Tipe Tahun Kondisi Sekarang Status Kepemilikan
/Perlengkapan Pembuatan (%)
ini
1 2 3 4 5 6 7 8 9
1 Dump Truk 4 Unit 3-4 m3 Mitsubishi 2012 80 % Kab. Aceh Besar Sewa
5 Pompa Air 1 Unit 1000 ltr/m Honda 2015 80 % Kab. Aceh Besar Sewa
6 Mollen (Concrete Mixer) 1 Unit 0,6 m3 Tiger 2015 80 % Kab. Aceh Besar Sewa
7 Generator Set 1 Unit 3000 watt Yanmar 2015 80 % Kab. Aceh Besar Sewa
8 Alat
Ukur (Theodolit/water
pass) 1 Unit 1000 m Sokkia 2014 80 % Kab. Aceh Besar Sewa
M. Basir Yusri
Direktur
I. Data Pengalaman Perusahaan
1 2 3 4 5 6 7 8 9 10
1 Rehabilitasi D.R Babah Nipah 527 Sungai, Danau dan Pembangunan kabupaten aceh Ir. T. Kahirul Muluk/Pengguna Jl. Ir. H. Mohd. Thaher No. No. KU.08.08/162/BWS Rp. 456.800.000,- 31 Desember 2007 No. 31 Desember
Ha PAKAET-1 Waduk Embung dn jaya Anggaran 18 Lueng Bata - Banda Aceh SI-RW/2008, Tanggal 22 2007
Bangunan Februari 2008
Penampung Air
Lainnya
2 - - Pekerjaan Kabupaten Aceh DRH. AMIRUDDIN S/Kuasa Jl.DR.Mr.T.Mohd Hasan Telp.. No. 524.1/1015/KPA- Rp. 1.432.000.000 31 Desember 2013 No. 31 Desember
Optiomalisasi Besar Pengguna Anggaran (0651) 75559090-7559050 Prod/V/2013, Tanggal 2013
Padang Fax. (0651) 7559060 23 mei 2013
Penggembalaan
Kabupaten Aceh
Besar
3 - - - - / - No. , Tanggal Rp - - No.
M. Basir Yusri
Direktur
J. Data Pengalama Perusahaan Dalam Kurun Waktu 4 Tahun Terakhir
Ringkasan Lingkup Pemberi Tugas / Pejabat Pembuat Komitmen Kontrak Tanggal Selesai Pekerjaan Berdasarkan
No. Nama Paket Pekerjaan Lokasi
Pekerjaan
Nama Alamat/Telepon No / Tanggal Nilai (Rp.) Kontrak (rencana) % B. A. Serah Terima
1 2 4 5 6 7 8 9 10
1 rehabilitasi D.R Babah Sungai, Danau dan Kabupaten Aceh Ir. T. Kahirul Muluk/Pengguna Jl. Ir. H. Mohd. Thaher No. KU.08.08/162/BWS Rp. 456.800.000,- 31 Desember 2007 No. 31 Desember
Nipah 527 Ha PAKET-1 Waduk Tengah Anggaran No. 18 Lueng Bata - SI-RW/2008 2007
Banda Aceh
2 - - Kabupaten Aceh DRH. AMIRUDDIN S/Kuasa Jl.DR.Mr.T.Mohd Hasan No. 524.1/1015/KPA- Rp. 1.432.000.000 31 Desember 2013 No. 31 Desember
Besar Pengguna Anggaran Telp.. (0651) Prod/V/2013 2013
75559090-7559050
Fax. (0651) 7559060
3 - - - / - No. Rp - 0 No.
- - - - / - No. Rp - 0 No.
M. Basir Yusri
Direktur
K. DATA PEKERJAAN YANG DI LAKSANAKAN
NIHIL
M. Basir Yusri
Direktur
L. Modal Kerja
Nomor : 3891/DB/610/VIII/2016
Tanggal : 16 Agustus 2016
Nama Bank : PT. bank Aceh Syariah
Nilai : Rp 170,000,000.00
#NAME?
Demikian pernyataan ini saya buat dengan sebenarnya dan penuh rasa tanggung jawab. Jika
dikemudian hari ditemui bahwa data/dokumen yang saya sampaikan tidak benar dan ada
pemalsuan, maka saya dan badan usaha yang saya wakili bersedia dikenakan sanksi berupa sanksi
administratif, sanksi pencantuman dalam Daftar Hitam, gugatan secara perdata, dan/atau
pelaporan secara pidana kepada pihak berwenang sesuai dengan ketentuan peraturan
perundang-undangan.
M. Basir Yusri
Direktur
SURAT PERNYATAAN
TIDAK AKAN MENGAJUKAN TUNTUTAN JIKA BELUM BEBASNYA LAHAN
Telepon/Fax : -
Email : #REF!
Sehubungan dengan adanya paket pelelangan pekerjaan Perbaikan Saluran Pembuang di gampong
Neuhun Kec. Mesjid Raya pada Kelompok Kerja Pekerjaan Konstruksi II Unit Layanan Pengadaan
(ULP) Kabupaten Aceh Besar sumber dana APBN Tahun Anggaran 2016, sesuai dengan pengumuman
pelelangan no. 01/PK-06.1/BPBD/2016 tanggal. 29 Agustus 2016 yang mendahului pengesahan DPA
APBA TA. 2015
Dalam hal ini bertindak untuk dan atas nama perusahaan CV. OZA KARYA menyatakan:
1. Bahwa perusahaan saya tidak akan mengajukan gugatan atau tuntutan dalam bentuk apapun
apabila pekerjaan yang dilelang ternyata tidak dapat dilaksanakan sebahagian atau seluruhnya
akibat belum bebasnya lahan.
Demikian pernyataan ini kami buat/berikan dengan penuh rasa tanggung jawab tanpa ada tekanan
dari pihak manapun.
M. Basir Yusri
Direktur
LAMPIRAN DOKUMEN LELANG
DAFTAR LAMPIRA-LAMPIRAN PENAWARAN