Rab Rumah 36 1
Rab Rumah 36 1
B )
KEGIATAN :-
PEKERJAAN :-
LOKASI :-
HARGA SATUAN
NO URAIAN PEKERJAAN VOLUME SATUAN
Bahan Kenek Tukang
1 2 3 4 5 6 7
I. PEKERJAAN TANAH/PONDASI
1 Pek. Pas. Sloof Beton Bertulang 1 : 2 : 3, Uk 15/20 cm 0.15 M3 3,778,000.00 494,375.00 317,030.00
2 Pek. Pas. Kolom Beton Bertulang 1 : 2 : 3, Uk 11/11 cm 0.49 M3 3,778,000.00 463,750.00 257,250.00
3 Pek. Pas. Ring Balok Beton Bertulang 1 : 2 : 3, Uk 12/15 cm 0.74 M3 3,778,000.00 555,625.00 335,650.00
4 Pek. Pas. Pad Beton 0.26 M3 3,778,000.00 463,750.00 257,250.00
5 Pek. Pas. Dinding Bataco 118.34 M2 82,244.00 1,750.00 1,176.00
6 Pek. Plesteran Dinding 1 : 4 204.63 M2 22,000.00 26,250.00 14,700.00
7 Pek. Pas. Plesteran Rabat Teras+T.Cuci+Car Port 18.25 M2 22,000.00 26,250.00 14,700.00
8 Pek. Pas. Keramik Lantai + Teras 36.75 M2 65,000.00 61,250.00 34,300.00
9 Pek. Pas. Keramik Lantai Wc 2.25 M2 59,000.00 61,250.00 34,300.00
10 Pek. Pas. Roster Beton (20/20) 16.00 Bh 30,000.00 - -
11 Pek. Pas. Dinding keramik WC T : 1 M 5.20 M2 62,000.00 78,750.00 44,100.00
12 Pek. Pas. Batu Alam 3.84 M2 160,000.00
13 Pek. Pas. Bak Fiber 1.00 Bh - -
14 Pek. Pas. Closet 1.00 Bh - -
SUB JUMLAH III
III. PEKERJAAN PAS KUSEN DAN PINTU JENDELA
1 Pek. Pas. Rangka Baja Ringan Zyncalume C.75.80 (By Order) 72.80 M2 - -
2 Pek. Pas. Atap Genteng Metal 72.80 M2 - -
3 Pek. Pas. Listplank GRC 34.72 M1 - -
4 Pek. Pas. Bubungan Genteng Metal 8.00 M1 - -
5 Pek. Pas. Plafond GRC + Rangka Hollow Galvanis 66.53 M2 - -
SUB JUMLAH V
V. PEKERJAAN PENGECATAN
1 Pek. Pengecatan Dinding Tembok, Plafond (Cat Tembok) 3 x Cat 271.16 M2 1,750.00 6,174.00
2 Pek. Pengecatan Kayu (Cat Minyak) 2 x Cat 21.09 M2 6,125.00 882.00
SUB JUMLAH VI
REKAPITULASI :
I. PEKERJAAN TANAH/PONDASI
II. PEKERJAAN STRUKTUR BETON DAN PASANGAN
III. PEKERJAAN PAS KUSEN DAN PINTU JENDELA
IV. PEKERJAAN PLAFOND DAN PENUTUP ATAP RANGKA BAJA RINGAN
V. PEKERJAAN PENGECATAN
JUMLAH
ANA ANGGARAN BIAYA ( R.A.B )
JUMLAH
476,109.38
105,802.08
472,562.81
4,591,080.00
273,112.50
5,918,666.77
688,410.75
2,210,178.74
3,445,924.95
1,169,740.00
10,078,804.88
12,881,615.88
1,148,837.50
5,900,212.50
347,737.50
480,000.00
961,220.00
614,400.00
-
-
39,927,082.69
632,038.68
1,281,840.00
1,941,072.00
-
-
-
-
-
-
3,854,950.68
-
-
-
-
-
-
2,148,691.65
147,766.42
2,296,458.07
5,918,666.77
39,927,082.69
3,854,950.68
-
2,296,458.07
51,997,158.21
HITUNGAN
1 2 3 4 5 6 7
I. PEKERJAAN PERSIAPAN
SUB JUMLAH V
VI. PEKERJAAN PENGECATAN