Perhitungan Kuantity

Pekerjaan

1. Galian Tanah

1.0577 7.9 8.3558

3.9297 7.9 31.0446


4.4 7.9 34.7600
65.8046

0.9047 7.9 7.14713


0.9047 7.9 7.14713
14.2943

2. Beton Mutu K 250


2.a Abutmen

2.889 2 7.7 44.4906

2.b Lantai dan Balok


1.7375 6.8 11.815

2.c Balok Diafragma


2.25 0.15 0.25 2 0.16875

2.d Wingwall
0.25 0.4 1.5 0.15
0.25 0.4 1.5 0.4875
2.865 0.25 0.71625
1.35375

2.e Plat Injak


6 0.2 1.5 2 3.6

2.f Tiang Sandaran


2.3 0.1 8 1.84

63.2681

3. Beton Mutu K 175


3.a Abutmen

4. Pasangan Batu
0.4 1.5 1.25 4 3
0.4 1.1 1.2 15 13.5

0.4 1.2 15 7.2

23.7

5. Batu Kosong
0.4 1.6 7.7 2 9.856
0.2 6 1.5 2 3.6
13.456
6. Timbunan
1.0985 6 6.591
0.2769 6 1.6614
1 1.8 15 6 126
0.8536 6 5.1216

139.374
KAIMANA - FAKFAK

NO. NAMA JENIS KELAMIN TGL LAHIR

1. SELFINA MANDUAPESSY PEREMPUAN 10/25/1954


2. VERONICA NGEBU PEREMPUAN 7/8/1984
3. GISEL TUDJUKA PEREMPUAN 6/11/2013
4. ARYO KLAU LAKI-LAKI 10/27/2017

Anda mungkin juga menyukai