A. PEKERJAAN KONSTRUKSI
II PEKERJAAN PONDASI
1 Pek. Penyemrotan Anti Rayap M2 978.38
2 Pek. Cor beton rabat 1 : 3 : 5 (lantai kerja ) M 3
46.55
3 Pek. Bekisting Batako M 2
978.38
4 Pek. Besi tulangan Pondasi Kg 55202.56
5 Pek. Cor Beton Pondasi K375 M3 509.98
VI PEKERJAAN BALOK
1 Pek. Bekisting Balok M2 60.72
2 Pek. Besi tulangan Balok Kg 2406.39
3 Pek. Cor Beton Balok K375 M3 9.9
I PEKERJAAN BALOK LT 1
1 Pek. Bekisting Balok M2 1500.79
2 Pek. Besi tulangan Balok Kg 58611.48
3 Pek. Cor Beton Balok K375 M3 217.01
II PEKERJAAN KOLOM LT 1
1 Pek. Bekisting Kolom M2 647.87
2 Pek. Besi tulangan Kolom Kg 18012.32
3 Pek. Cor Beton Kolom K375 M3 79.61
II PEKERJAAN KOLOM LT 3
1 Pek. Bekisting Kolom M2 453.09
2 Pek. Besi tulangan Kolom Kg 11431.73
3 Pek. Cor Beton Kolom K375 M3 47.33
II PEKERJAAN PONDASI
1 Pek. Penyemrotan Anti Rayap M2 978.38 1
Tenaga OH 0.005 4.8919 8 0.6114875
Pekerja OH 0.0008 0.782704 1 0.782704
Mandor
V PEKERJAAN KOLOM
1 Pek. Bekisting Kolom M2 929.00
Tenaga
Pekerja OH 0.66 613.14 10 61.314
Tukang Kayu OH 0.33 306.57 5 61.314
Kepala Tukang OH 0.033 30.657 1 30.657
Mandor OH 0.033 30.657 1 30.657
VI PEKERJAAN BALOK
1 Pek. Bekisting Balok M2 60.72
Tenaga
Pekerja OH 0.66 40.0752 10 4.00752
Tukang Kayu OH 0.33 20.0376 5 4.00752
Kepala Tukang OH 0.033 2.00376 1 2.00376
Mandor OH 0.033 2.00376 1 2.00376
I PEKERJAAN BALOK LT 1
1 Pek. Bekisting Balok M2 1500.79
Tenaga
Pekerja OH 0.66 990.5214 10 99.05214
Tukang Kayu OH 0.33 495.2607 5 99.05214
Kepala Tukang OH 0.033 49.52607 1 49.52607
Mandor OH 0.033 49.52607 1 49.52607
II PEKERJAAN KOLOM LT 1
1 Pek. Bekisting Kolom M2 647.87
Tenaga
Pekerja OH 0.660 427.5942 10 42.75942
Tukang Kayu OH 0.330 213.7971 5 42.75942
Kepala Tukang OH 0.033 21.37971 1 21.37971
Mandor OH 0.033 21.37971 1 21.37971
II PEKERJAAN KOLOM LT 2
1 Pek. Bekisting Kolom M2 502.42
Tenaga
Pekerja OH 0.66 331.5972 10 33.15972
Tukang Kayu OH 0.33 165.7986 5 33.15972
Kepala Tukang OH 0.033 16.57986 1 16.57986
Mandor OH 0.033 16.57986 1 16.57986
2 Pek. Besi tulangan Kolom Kg 15504.64
Tenaga
Pekerja OH 0.007 108.5325 10 10.853248
Tukang Besi OH 0.0007 10.85325 5 2.1706496
Kepala Tukang OH 0.0007 10.85325 1 10.853248
Mandor OH 0.0004 6.201856 1 6.201856
II PEKERJAAN KOLOM LT 3
1 Pek. Bekisting Kolom M2 453.09
Tenaga
Pekerja OH 0.66 299.0394 10 29.90394
Tukang Kayu OH 0.33 149.5197 5 29.90394
Kepala Tukang OH 0.033 14.95197 1 14.95197
Mandor OH 0.033 14.95197 1 14.95197
a b c d e
A. PEKERJAAN KONSTRUKSI
II PEKERJAAN SLOOF
1 Pek. Bekisting Sloof M2 450.31
Tenaga
Pekerja OH 0.5200
Tukang Kayu OH 0.2600
Kepala Tukang OH 0.0260
Mandor OH 0.0260
VI PEKERJAAN BALOK
1 Pek. Bekisting Balok M2 60.72
Tenaga
Pekerja OH 0.6600
Tukang Kayu OH 0.3300
Kepala Tukang OH 0.0330
Mandor OH 0.0330
II PEKERJAAN KOLOM LT 1
1 Pek. Bekisting Kolom M2 647.87
Tenaga
Pekerja OH 0.6600
Tukang Kayu OH 0.3300
Kepala Tukang OH 0.0330
Mandor OH 0.0330
II PEKERJAAN KOLOM LT 2
1 Pek. Bekisting Kolom M2 502.42
Tenaga
Pekerja OH 0.6600
Tukang Kayu OH 0.3300
Kepala Tukang OH 0.0330
Mandor OH 0.0330
II PEKERJAAN KOLOM LT 3
1 Pek. Bekisting Kolom M2 453.09
Tenaga
Pekerja OH 0.6600
Tukang Kayu OH 0.3300
Kepala Tukang OH 0.0330
Mandor OH 0.0330
2 Pek. Besi tulangan Kolom Kg 11,431.73
Tenaga
Pekerja OH 0.0700
Tukang Besi OH 0.0700
Kepala Tukang OH 0.0070
Mandor OH 0.0040
120.00 22.7919167 23
2.00 5 100.00
20.00 1 20.00
266.67 0.3799875 1
3.33 50 166.67
100.00 1 100.00
- #DIV/0! #DIV/0!
50 -
-
62.31 0.74709588 1
0.61 6 3.64
3.64 3 10.91
35.71 1 35.71
12.05 1 12.05
43.22 22.6354017 23
0.48 10 4.76
38.46 1 38.46
607.14 90.9218635 91
14.29 10 142.86
14.29 5 71.43
142.86 1 142.86
250.00 1 250.00
49.52 10.30 11
0.48 6 2.86
2.86 3 8.57
28.57 1 28.57
9.52 1 9.52
100.00 4.5031 5
1.92 6 11.54
3.85 3 11.54
38.46 1 38.46
38.46 1 38.46
521.43 38.3039233 39
14.29 6 85.71
14.29 3 42.86
142.86 1 142.86
250.00 1 250.00
49.52 2.04507692 3
0.48 6 2.86
2.86 3 8.57
28.57 1 28.57
9.52 1 9.52
1,440.00 29.1538889 30
40.00 6 240.00
40.00 3 120.00
40.00 2 80.00
1,000.00 1 1,000.00
49.52 9.137625 10
0.48 6 2.86
2.86 3 8.57
28.57 1 28.57
9.52 1 9.52
225.00 2.01124444 3
10.00 6 60.00
5.00 3 15.00
50.00 1 50.00
100.00 1 100.00
521.43 80.5126575 81
14.29 6 85.71
14.29 3 42.86
142.86 1 142.86
250.00 1 250.00
49.52 9.137625 10
0.48 6 2.86
2.86 3 8.57
28.57 1 28.57
9.52 1 9.52
225.00 2.01124444 3
10.00 6 60.00
5.00 3 15.00
50.00 1 50.00
100.00 1 100.00
78.79 11.7911538 12
1.52 6 9.09
3.03 3 9.09
30.30 1 30.30
30.30 1 30.30
521.43 50.6533041 51
14.29 6 85.71
14.29 3 42.86
142.86 1 142.86
250.00 1 250.00
49.52 2.37158654 3
0.48 6 2.86
2.86 3 8.57
28.57 1 28.57
9.52 1 9.52
78.79 0.77067692 1
1.52 6 9.09
3.03 3 9.09
30.30 1 30.30
30.30 1 30.30
521.43 4.61499452 5
14.29 6 85.71
14.29 3 42.86
142.86 1 142.86
250.00 1 250.00
49.52 0.19990385 1
0.48 6 2.86
2.86 3 8.57
28.57 1 28.57
9.52 1 9.52
78.79 19.0484885 20
1.52 6 9.09
3.03 3 9.09
30.30 1 30.30
30.30 1 30.30
14.29 6 85.71
14.29 3 42.86
142.86 1 142.86
250.00 1 250.00
49.52 4.38193269 5
0.48 6 2.86
2.86 3 8.57
28.57 1 28.57
9.52 1 9.52
78.79 8.22296538 9
1.52 6 9.09
3.03 3 9.09
30.30 1 30.30
30.30 1 30.30
521.43 34.5441753 35
14.29 6 85.71
14.29 3 42.86
142.86 1 142.86
250.00 1 250.00
49.52 1.60750962 2
0.48 6 2.86
2.86 3 8.57
28.57 1 28.57
9.52 1 9.52
78.79 22.2157269 23
1.52 6 9.09
3.03 3 9.09
30.30 1 30.30
30.30 1 30.30
1,440.00 10.1420833 11
40.00 6 240.00
40.00 3 120.00
40.00 2 80.00
1,000.00 1 1,000.00
49.52 3.26630769 4
0.48 6 2.86
2.86 3 8.57
28.57 1 28.57
9.52 1 9.52
78.79 3.81759231 4
1.52 6 9.09
3.03 3 9.09
30.30 1 30.30
30.30 1 30.30
1,440.00 3.55638889 4
40.00 6 240.00
40.00 3 120.00
40.00 2 80.00
1,000.00 1 1,000.00
49.52 6.07344231 7
0.48 6 2.86
2.86 3 8.57
28.57 1 28.57
9.52 1 9.52
78.79 17.5785923 18
1.52 6 9.09
3.03 3 9.09
30.30 1 30.30
30.30 1 30.30
521.43 98.1714712 99
14.29 6 85.71
14.29 3 42.86
142.86 1 142.86
250.00 1 250.00
49.52 3.95567308 4
0.48 6 2.86
2.86 3 8.57
28.57 1 28.57
9.52 1 9.52
78.79 6.37686923 7
1.52 6 9.09
3.03 3 9.09
30.30 1 30.30
30.30 1 30.30
521.43 29.734926 30
14.29 6 85.71
14.29 3 42.86
142.86 1 142.86
250.00 1 250.00
49.52 1.37045192 2
0.48 6 2.86
2.86 3 8.57
28.57 1 28.57
9.52 1 9.52
78.79 32.0884385 33
1.52 6 9.09
3.03 3 9.09
30.30 1 30.30
30.30 1 30.30
0.48 6 2.86
2.86 3 8.57
28.57 1 28.57
9.52 1 9.52
1,440.00 0.17980556 1
40.00 6 240.00
40.00 3 120.00
40.00 2 80.00
1,000.00 1 1,000.00
78.79 17.2562077 18
1.52 6 9.09
3.03 3 9.09
30.30 1 30.30
30.30 1 30.30
521.43 96.8386521 97
14.29 6 85.71
14.29 3 42.86
142.86 1 142.86
250.00 1 250.00
49.52 3.89085577 4
0.48 6 2.86
2.86 3 8.57
28.57 1 28.57
9.52 1 9.52
78.79 5.75075769 6
1.52 6 9.09
3.03 3 9.09
30.30 1 30.30
30.30 1 30.30
521.43 21.9238658 22
14.29 6 85.71
14.29 3 42.86
142.86 1 142.86
250.00 1 250.00
49.52 0.95570192 1
0.48 6 2.86
2.86 3 8.57
28.57 1 28.57
9.52 1 9.52
78.79 28.5199962 29
1.52 6 9.09
3.03 3 9.09
30.30 1 30.30
30.30 1 30.30
1,440.00 13.0201389 14
49.52 4.54710577 5
0.48 6 2.86
2.86 3 8.57
28.57 1 28.57
9.52 1 9.52
78.79 16.4874346 17
1.52 6 9.09
3.03 3 9.09
30.30 1 30.30
30.30 1 30.30
521.43 91.850663 92
14.29 6 85.71
14.29 3 42.86
142.86 1 142.86
250.00 1 250.00
49.52 3.70730769 4
0.48 6 2.86
2.86 3 8.57
28.57 1 28.57
9.52 1 9.52
78.79 12.1154423 13
1.52 6 9.09
3.03 3 9.09
30.30 1 30.30
30.30 1 30.30
521.43 75.524937 76
14.29 6 85.71
14.29 3 42.86
142.86 1 142.86
250.00 1 250.00
49.52 2.82328846 3
0.48 6 2.86
2.86 3 8.57
28.57 1 28.57
9.52 1 9.52
78.79 6.73669615 7
1.52 6 9.09
3.03 3 9.09
30.30 1 30.30
30.30 1 30.30
521.43 24.7166548 25
14.29 6 85.71
14.29 3 42.86
142.86 1 142.86
250.00 1 250.00
49.52 1.05181731 2
0.48 6 2.86
2.86 3 8.57
28.57 1 28.57
9.52 1 9.52
78.79 6.73669615 7
1.52 6 9.09
3.03 3 9.09
30.30 1 30.30
30.30 1 30.30
1,440.00 8.94997917 9
40.00 6 240.00
40.00 3 120.00
40.00 2 80.00
1,000.00 1 1,000.00
49.52 1.05181731 2
0.48 6 2.86
2.86 3 8.57
28.57 1 28.57
9.52 1 9.52
78.79 24.7703077 25
1.52 6 9.09
3.03 3 9.09
30.30 1 30.30
30.30 1 30.30
1,440.00 11.3083333 12
40.00 6 240.00
40.00 3 120.00
40.00 2 80.00
1,000.00 1 1,000.00
49.52 3.87086538 4
0.48 6 2.86
2.86 3 8.57
28.57 1 28.57
9.52 1 9.52
78.79 1.31949231 2
1.52 6 9.09
3.03 3 9.09
30.30 1 30.30
30.30 1 30.30
1,440.00 0.14438889 1
40.00 6 240.00
40.00 3 120.00
40.00 2 80.00
1,000.00 1 1,000.00
49.52 0.22191346 1
0.48 6 2.86
2.86 3 8.57
28.57 1 28.57
9.52 1 9.52
(double wiremesh M-7)
Waktu Pelasksaan
Kebutuhan Sumber Daya
Kapasitas Jumlah Total Kap.
Per Sat Volume Durasi sesuai Durasi Yang
No Uraian Pekerjaan Sat Volume Produksi Tenaga Produksi
(KT) Hitungan Dipakai
A PEKERJAAN KONSTRUKSI
A.1 PEKERJAAN PERSIAPAN (UMUM)
1 Pembersihan site/penebangan pohon phn 10.00 0.04 25 7 175 0.0571 1
2 Pengukuran site Ls 1.00 0.035 28.571428571 7 200 0.0050 1
3 Pasang pagar pengaman M' 332.20 0.03 33.333333333 10 333.33333333 0.9966 1
3 Pek. Pembuangan tanah hasil galian (keluar lokasi) M3 6177.52 282.68 21.85 22
Tenaga
Pekerja OH 0.3300 3.03 10 30.30
Mandor OH 0.0100 100.00 1 100.00
Sopir OH 0.1050 9.52 8 76.19
Pembantu Sopir OH 0.1050 9.52 8 76.19
4 Pek. Urugan tanah kembali dipadatkan M3 2735.03 164.77 16.60 17
Tenaga
Pekerja OH 0.1920 5.21 10 52.08
Mandor OH 0.0190 52.63 1 52.63
Operator OH 0.0333 30.03 1 30.03
Pembantu Operator OH 0.0333 30.03 1 30.03
II PEKERJAAN PONDASI
1 Pek. Penyemrotan Anti Rayap M2 978.38 1850.00 0.53 1
Tenaga
Pekerja OH 0.0050 200.00 3 600.00
Mandor OH 0.0008 1250.00 1 1250.00
2 Pek. Cor beton rabat 1 : 3 : 5 (K175) (lantai kerja ) M3 46.55 52.61 0.88 1
Tenaga
Pekerja OH 1.6500 0.61 2 1.21
Tukang Batu OH 0.2750 3.64 1 3.64
Kepala Tukang OH 0.0280 35.71 1 35.71
Mandor OH 0.0830 12.05 1 12.05
2 Pek. Cor Beton lantai base K375 (tebal 20) M3 452.53 67.16 6.74 7
Tenaga
Pekerja OH 1.6500 0.61 20 12.12
Tukang Batu OH 0.2750 3.64 2 7.27
Kepala Tukang OH 0.0280 35.71 1 35.71
Mandor OH 0.0830 12.05 1 12.05
2 Pek. Cor Beton lantai base K375 (tebal 25) M3 452.53 67.16 6.74 7
Tenaga
Pekerja OH 1.6500 0.61 20 12.12
Tukang Batu OH 0.2750 3.64 2 7.27
Kepala Tukang OH 0.0280 35.71 1 35.71
Mandor OH 0.0830 12.05 1 12.05
V PEKERJAAN KOLOM
1 Pek. Bekisting Kolom M2 929.00 133.33 6.97 7.00
Tenaga
Pekerja OH 0.6600 1.52 20 30.30
Tukang Kayu OH 0.3300 3.03 4 12.12
Kepala Tukang OH 0.0330 30.30 2 60.61
Mandor OH 0.0330 30.30 1 30.30
VI PEKERJAAN BALOK
1 Pek. Bekisting Balok M2 60.72 66.67 0.91 1
Tenaga
Pekerja OH 0.6600 1.52 2 3.03
Tukang Kayu OH 0.3300 3.03 1 3.03
Kepala Tukang OH 0.0330 30.30 1 30.30
Mandor OH 0.0330 30.30 1 30.30
I PEKERJAAN BALOK LT 1
1 Pek. Bekisting Balok M2 1500.79 125.76 11.93 12
Tenaga
Pekerja OH 0.6600 1.52 15 22.73
Tukang Kayu OH 0.3300 3.03 4 12.12
Kepala Tukang OH 0.0330 30.30 2 60.61
Mandor OH 0.0330 30.30 1 30.30
II PEKERJAAN KOLOM LT 2
1 Pek. Bekisting Kolom M2 502.42 133.33 3.77 4
Tenaga
Pekerja OH 0.6600 1.52 20 30.30
Tukang Kayu OH 0.3300 3.03 4 12.12
Kepala Tukang OH 0.0330 30.30 2 60.61
Mandor OH 0.0330 30.30 1 30.30
II PEKERJAAN KOLOM LT 3
1 Pek. Bekisting Kolom M2 453.09 133.33 3.40 4
Tenaga
Pekerja OH 0.6600 1.52 20 30.30
Tukang Kayu OH 0.3300 3.03 4 12.12
Kepala Tukang OH 0.0330 30.30 2 60.61
Mandor OH 0.0330 30.30 1 30.30
P= 4.32692308 M3/Jam
5 M3/Jam (Di Bulatkan)
P= 40 M3/Hari
Alat : Concrete Pump
Produktivitas Jumlah Durasi Durasi
Volume Alat Alat Perhitungan Dipakai
No Uraian Pekerjaan Sat
Pekerjaan
M3/hari/unit unit (Hari) (Hari)