RAB Dan Kurva S
RAB Dan Kurva S
1 2
I PEKERJAAN PERSIAPAN
SUB TOTAL
PAJAK PERTAMBAHAN NILAI (10%)
TOTAL
DIBULATKAN
Terbilang :
EKAPITULASI
N BIAYA PEKERJAAN KONSTRUKSI
TOTAL BIAYA
JAAN
( Rp )
146,740,304.04
4,983,686,237.69
3,750,000.00
5,134,176,541.73
513,417,654.17
5,647,594,195.90
5,647,594,100.00
RENCANA ANGGARAN BIAYA
HARGA
No URAIAN PEKERJAAN VOL SAT SATUAN
(Rp.)
I PEKERJAAN PERSIAPAN
3 Pembuatan Direksi Keet, Gudang Bahan dan Bangsal Kerja 36.00 M2 763,532
Sub Total I
Sub Total IV
JUMLAH (I+II+III)
CANA ANGGARAN BIAYA
73,179,360
27,487,158
14,750,000
19,410,250
11,000,000
913,537
146,740,304
3,090,547,956
10,737,375
583,641,406
6,370,000
1,292,389,500
4,983,686,238
2,000,000
1,750,000
3,750,000
5,134,176,541.73
ANALISA HARGA SATUAN PEKERJAAN
Satuan Pembayaran : LS
A Alat
B Jumlah Alat
Satuan Pembayaran : M2
A Bahan
B Tenaga Kerja
A Bahan
Satuan Pembayaran : M3
A Bahan
B Tenaga Kerja
Satuan Pembayaran : M3
A Bahan
B Tenaga Kerja
Satuan Pembayaran : M3
A Bahan
B Tenaga Kerja
C Alat
Jumlah Alat
Satuan Pembayaran : M3
A Bahan
B Tenaga Kerja
Satuan Pembayaran : M2
A Bahan
B Tenaga Kerja
Jumlah Alat
Satuan Pembayaran : M2
A Bahan
B Tenaga Kerja
Satuan Pembayaran : M2
3 Alat Bantu
B Tenaga Kerja
1 Surveyor OH 1 150,000
2 Pekerja OH 1 60,000
Satuan Pembayaran : M2
A Bahan
LS
15,000,000
15,000,000
15,000,000
15,000,000
60,000,000
1 M2 Pembersihan Lahan
M2
15,000
2,375
17,375
17,375
M'
46,800
320
21,000
68,120
6,000
8,000
900
475
15,375
83,495
Menggali 1 M3 Tanah Biasa Sedalam 1 Meter
M3
45,000
2,375
47,375
47,375
M3
15,000
789
15,789
15,789
M3
60,000
60,000
18,000
950
18,950
4,500
1,375
31,020
36,895
115,845
Memasang 1 M3 Pondasi Batu Belah, Campuran 1 PC : 3 PP
M3
390,000
176,800
81,600
648,400
90,000
60,000
6,750
7,125
163,875
812,275
Pemasangan Geotextile
M2
49,500
49,500
1,200
17,100
18,300
80,000
80,000
147,800
Papan Nama Proyek
M2
21,840
11,250
4,050
86,800
9,600
105,000
98,250
336,790
95,475
126,000
1,400
80,000
80,000
382,875
719,665
M2
150,000
300,000
450,000
150,000
60,000
210,000
99,000,000
Pekerjaan Plesteran 1 m2 1PC: 3PP. TEBAL 15MM
M2
505,440
3,450
508,890
18,000
12,000
1,350
1,425
32,775
541,665
Pemasangan cerucuk
BTG
16,000
16,000
10,713
2,856
1,696
15,265
31,265
HARGA STANDAR BAHAN BANGUNAN
Harga
No Jenis Barang Satuan
(Rp.)
1 2 3 4
15 Geotextile m2 45,000
HARGA STANDAR UPAH DAN SEWA PAKAI PERALATAN
Harga
No Jenis Bahan Satuan Ket
(Rp.)
I UPAH KERJA
1 Pekerja OH 60,000
2 Tukang OH 80,000
5 Surveyor OH 150,000
II PERALATAN
NO URAIAN SATUAN
TENAGA
MATERIAL
1 Air m3 25,000.00
2 Batu Kosong 60-100 kg/unit m3 175,000.00
3 Batu Kali / Gunung 15 - 25 Kg/Unit m3 175,000.00
4 Drum / Tangki Penampung Air Bh 450,000.00
5 Kayu Kelas III m3 3,290,833.00
6 Paku Kg 16,000.00
7 Papan Kelas III m3 3,500,000.00
8 Pasir Beton m3 240,000.00
9 Pasir Pasang m3 200,000.00
10 Pipa PVC 2" Btg 50,000.00
11 Semen PC (50 Kg) Zak 61,000.00
12 Seng Gelombang BJLS 20 Lembar 45,625.00
13 Solar Liter 12,700.00
14 Tanah M3 80,000.00
15 Tripleks 3 mm Lembar 51,535.00
16 Tripleks 4 mm Lembar 54,870.00
17 Kayu ceocok dia 10-12 cm btg 35,000.00
PERALATAN
1 Dump Truck Jam 156,666.67
2 Excavator Jam 360,000.00
3 Buldozer Jam 875,000.00
4 Theodolite Jam 20,833.33
5 Vibrator Roller Jam 200,000.00
6 Waterpass Jam 3,750.00
7 Alat pemancangan set 450,000.00
8 Genset 2.5 kVa Jam 133333.3333333
120
100
0.7116132
0.2672916 0.2672916
60
0.0348042
40