TAKE OF SHEET

I Galian Tanah
p = 100.00 M A = p x l
l = 0.60 M V = A x t
t = 0.60 M l = (lebar atas + lebar bawah)/2
A = 60.00 M2
V = 36.00 M3 36.00 M3

II Cor Beton Dinding --- K 125


p = 200.00 M Ki / Ka
l = 0.15 M
t = 0.60 M
A = 30.00 M2
V = 18.00 M3 18.00 M3

III Plasteran Dinding


p = 200.00 M Ki / Ka
l/t = 0.68 M
A = 136.00 M2 136.00 M3

IV Cor Beton Lantai --- K 125


p = 100.00 M
l = 0.50 M
t = 0.07 M
A = 50.00 M2
V = 3.50 M3 4.00 M3

V Bekesting --- / M2
IV.A Papan ¾"x 8 "
P = 4.80 M P = Panjang Papan
Kebutuhan
Panjang Rencana = #REF! M Ki / Ka
#REF! Kp
#REF! Kp Asumsi 3x Pakai
Pembulatan #REF! Kp

IV.B Kayu 1½" x 2 "


P1 = 4.80 M Panjang Kayu
T = 1.20 M Tinggi / Dalam Pasangan Sisi Ka/Ki
LA = 0.70 M Lebar Atas Saluran
LB = 0.50 M Lebar Bawah Saluran
S = 0.00 M Jarak Pasang
Kebutuhan
Panjang Rencana = 100.00 M
#DIV/0! Bh Kwantitas
2.40 M / Bh
#DIV/0! M
#DIV/0! Btg
#DIV/0! Btg Asumsi 3x Pakai
Pembulatan = ### Btg
KEBUTUHAN ANALISA BAHAN & UPAH

Kabupaten : Deli Serdang Jenis Prasarana : Drainase


Kecamatan : Lokasi :
Desa : Dusun :

Kode Analisa : SNI_2835 : 2008


Jenis Pekerjaan : Galian Tanah Sedalam 1 M
Satuan Pekerjaan : M3
Volume : 36.00
No Uraian Satuan Indeks Kebutuhan
A Tenaga Kerja
1 Pekerja OH 0.075 2.700
2 Mandor OH 0.025

Kode Analisa : SNI_2836 : 2008


Jenis Pekerjaan : Memasang Batu Kali, 1 PC : 4 PP
Satuan Pekerjaan : M3
Volume : 18.00
No Uraian Sat Indeks Kebutuhan
A Bahan
1 Batu Kali M3 1.200 21.600
2 Semen @ 40 kg Zak 4.075 73.350
3 Pasir Pasang M3 0.520 9.360

B Tenaga Kerja
1 Pekerja OH 1.500 27.000
2 Tukang OH 0.750 13.500

Kode Analisa : SNI_2837 : 2008


Jenis Pekerjaan : Membuat Plesteran 1, PC : 4 PP, tebal 15 mm
Satuan Pekerjaan : M2
Volume : 136.00
No Uraian Sat Indeks Kebutuhan
A Bahan
1 Semen @ 40 Kg Zak 0.156 21.216
2 Pasir Pasang M3 0.024 3.264

B Tenaga Kerja
1 Pekerja OH 0.300 40.800
2 Tukang OH 0.150 20.400

Kode Analisa : SNI_7394 : 2008


Jenis Pekerjaan : Membuat Beton mutu f’c = 9,8 Mpa, ( K 125 )
slump (12 ± 2) cm, w/c = 0,78
Satuan Pekerjaan : M3
Volume : 3.50
No Uraian Sat Indeks Kebutuhan
A Bahan
1 Semen @ 40 Kg Zak 6.900 24.150
2 Pasir Beton M3 0.591 2.069
3 Kerikil Guli M3 0.750 2.625
4 Air Liter 215.000 752.500

B Tenaga Kerja
1 Pekerja OH 1.650 5.775
2 Tukang OH 0.275 0.963
REKAPITULASI BAHAN DAN UPAH KERJA

Kebutuhan
No Uraian
Pekerja Bahan/Alat
≈ Satuan

I Bahan
1 Semen @ 40 Kg 118.72 119.00 Zak
2 Pasir Pasang 12.62 13.00 M3
3 Pasir Beton 2.07 2.00 M3
4 Batu Kali 15/20 21.60 22.00 M3
5 Kerikil Guli-A 2.63 3.00 M3
6 Air Kerja 752.50 753.00 Ltr
7 Kayu -- 1½" x 2" #DIV/0! #DIV/0! Btg
8 Paku

II Alat
1 Sekop 0.00 0.00 Bh
2 Selang Timbang Air 0.00 0.00 Meter
3 Kereta Sorong 0.00 0.00 Bh
4 Ember Cor 0.00 0.00 Bh
5 Cangkul + Gagang 0.00 0.00 BH
6 Benang Nylon 0.00 0.00 Roll
7 Sewa Molen 0.00 0.00 Hari

II Tenaga Kerja
1 Tukang 34.86 35.00 HOK
2 Pekerja 76.28 76.00 HOK

III Durasi
1 Waktu Pelaksanaan 12.00 Hari
2 Tukang 3.00 Org 11.62 12.00 HOK
3 Pekerja 6.00 Org 12.71 13.00 HOK
HARGA SATUAN

No Uraian Harga Satuan Keterangan

I Bahan / Alat
1 Semen @ 40 Kg -
2 Pasir Pasang -

Harga Belum Termasuk PPN / PPh


3 Pasir Beton -
4 Kerkil Guli-A -
5 Batu Kali -
6 Air -
7 Kayu 1½" x 2" -
8 Sekop -
9 Selang Timbang Air -
10 Kereta Sorong -
11 Timba Cor -
12 Cangkul + Gagang -
13 Benang Nylon -
14 Plang Informasi -
15 Dokumentasi -
16 Sewa Molen -
17 Demobilisasi / Mobilisasi -
18 Paku

II TPK
1 Ketua -
2 Sekretaris -
3 Anggota -

III Jasa
1 Jasa Teknik (Non Bangunan) 300,000.00 Sesuai PerBup Setempat

IV Tenaga Kerja
1 Pekerja 80,000.00
2 Tukang -0
`
RENCANA ANGGARAN BIAYA ( RAB )
Desa ………………………………….
Tahun Anggaran 2018

1. Bidang : 2.2 Pelaksanaan Pembangunan Desa


2. Kegiatan : 2.2.2 Pengadaan, Pembangunan, Pengembangan dan Pemeliharaan
Sarana Prasarana Transportasi (DRAINASE)
3. Waktu Pelaksanaan : 12.00 Hari
4. Panjang : 150.00 M

Rincian Pendanaan : Dana Desa ( APBN)

VOLUME / HARGA SATUAN JUMLAH HARGA


NO URAIAN PEKERJAAN
SATUAN (Rp.) (Rp.)

1 2 3 4 5
Dimensi :
I Belanja Modal
A. Pekerjaan Persiapan
1 Plang Informasi 1.00 Ls - -
2 Dokumentasi 1.00 Ls - -
Sub Total A -
B. Upah Kerja
1 Tukang 35.00 Hok - -
2 Pekerja 76.00 Hok 80,000.00 6,080,000
Sub Total B 6,080,000.00
C. Honor Tim Pengelola Kegiatan
(Apabila jlh anggaran diatas 50 Juta)
1. Ketua 1.00 LS - -
2. Sekretaris 1.00 LS - -
5. Anggota 3.00 LS - -
Sub Total C -
D. Jasa
1.Tenaga Teknis 1.00 LS 300,000 300,000
Sub Total D 300,000.00
E. Alat
1 Sekop - Bh - -
2 Selang Timbang Air - M - -
3 Kereta Sorong - Bh - -
4 Timba Cor - Bh - -
5 Cangkul + Gagang - Bh - -
6 Benang Nylon - Roll - -
- Mobilisasi / Demobilisasi 1.00 ls - -
1 Sewa Molen - Hari - -
Sub Total E -
Total I 6,380,000.00
II Belanja Material
1 Semen @ 40 Kg 119.00 Zak - -
2 Pasir Pasang 13.00 M³ - -
3 Pasir Beton 2.00 M³ - -
4 Kerikil Guli-A 22.00 M³ - -
5 Batu Kali 3.00 M³ - -
6 Air 753.00 Ltr - -
7 Kayu 1½" x 2" #DIV/0! Btg - #DIV/0!
Sub Total II #DIV/0!
Total II #DIV/0!
Total Biaya I + II #DIV/0!

Nama Desa, ……………………………..2018

Diketahui : Di Buat Oleh :


Kepala Desa …………………… Team Pengelola Kegiatan

Nama Nama
DANA DESA

PROVINSI SUMATERA UTARA

KAB. DELI SERDANG

KEC. _________________

DESA _________________

JENIS PRASARANA :

PEKERJAAN DRAINASE

JUDUL GAMBAR :

DRAINASE PAS BATU KALI

(Pot. Melintang dan Memanjang)