Anda di halaman 1dari 41

TABEL XII.

ANALISA HARGA SATUAN (AHS) PEKERJAAN INSTALA

Harga Sat.
No. Uraian Jenis pekerjaan Sat. Koeff. Bahan / Upah / Alat
Rp.
1 2 3 4 5
XII PEKERJAAN INSTALASI AIR DAN SANITASI
XII.1 1 M' PIPA PVC MASPION ABU DIAMETER 1"
Pipa PVC maspion abu diameter 1" (AW) bt 0.167 Rp30,000.00
Perlengkapan (35% x harga pipa) lot 1.000 Rp10,500.00
Tukang batu Oh 0.060 Rp48,000.00
Kepala tukang batu Oh 0.006 Rp52,000.00
Pekerja Oh 0.036 Rp38,000.00
Mandor Oh 0.002 Rp60,000.00
Jumlah
XII.2 1 M' PIPA PVC MASPION ABU DIAMETER 3"
Pipa PVC maspion abu diameter 3" (AW) bt 0.167 Rp153,000.00
Perlengkapan (35% x harga pipa) lot 1.000 Rp53,550.00
Tukang batu Oh 0.060 Rp48,000.00
Kepala tukang batu Oh 0.006 Rp52,000.00
Pekerja Oh 0.036 Rp38,000.00
Mandor Oh 0.002 Rp60,000.00
Jumlah
XII.3 1 M' PIPA PVC MASPION ABU DIAMETER 4"
Pipa PVC maspion abu diameter 4" (AW) bt 0.167 Rp235,000.00
Perlengkapan (35% x harga pipa) lot 1.000 Rp82,250.00
Tukang batu Oh 0.060 Rp48,000.00
Kepala tukang batu Oh 0.006 Rp52,000.00
Pekerja Oh 0.036 Rp38,000.00
Mandor Oh 0.002 Rp60,000.00
Jumlah
XII.4 1 BUAH BAK MANDI FIBERGLASS 60 x 60
Bak fiberglass bh 1.000 Rp95,000.00
Perlengkapan (35% x harga pipa) lot 1.000 Rp33,250.00
Tukang batu Oh 2.700 Rp48,000.00
Kepala tukang batu Oh 0.540 Rp52,000.00
Pekerja Oh 1.800 Rp38,000.00
Mandor Oh 0.110 Rp60,000.00
Jumlah
XII.5 1 BUAH BATHTUBE
Bathtube standard bh 1.000 Rp2,745,000.00
Perlengkapan (35% x harga pipa) lot 1.000 Rp960,750.00
Tukang batu Oh 2.700 Rp48,000.00
Kepala tukang batu Oh 0.540 Rp52,000.00
Pekerja Oh 1.800 Rp38,000.00
Mandor Oh 0.110 Rp60,000.00
Jumlah
XII.6 1 BUAH KERAN
Kran stainless lokal kait bh 1.000 Rp22,000.00
Perlengkapan (6% x harga pipa) lot 1.000 Rp1,320.00
Pekerja Oh 0.040 Rp38,000.00
Mandor Oh 0.040 Rp60,000.00
Jumlah
XII.7 1 KLOSET DUDUK
Kloset duduk warna standard TOTO C 240 lengkap bh 1.000 Rp2,050,000.00
Perlengkapan (6% x harga pipa) lot 1.000 Rp123,000.00
Tukang batu Oh 1.100 Rp48,000.00
Kepala tukang batu Oh 0.010 Rp52,000.00
Pekerja Oh 3.300 Rp38,000.00
Mandor Oh 0.160 Rp60,000.00
Jumlah
XII.8 1 KITCHEN ZINK STAINLESS 2 LUBANG
Kitchen zink stainless 2 lubang bh 1.000 Rp425,000.00
Perlengkapan (612% x harga pipa) lot 1.000 Rp51,000.00
Tukang batu Oh 1.100 Rp48,000.00
Kepala tukang batu Oh 0.010 Rp52,000.00
Pekerja Oh 3.300 Rp38,000.00
Mandor Oh 0.160 Rp60,000.00
Jumlah
XII.9 1 UNIT SEPTICTANK 2 X 1,5 X 1,5 M + REMBESANNYA (KANTOR TYPE KECIL)
Galian tanah M3 4.500 Rp36,900.00
Pasir urug M3 0.214 Rp50,000.00
Lantai kerja t = 10 cm M2 2.250 Rp57,084.53
Pas. Bata 1 PC : 2 PS + plesteran M2 15.000 Rp71,656.00
Plat beton penutup dan balok M3 0.300 Rp8,591,412.59
Pipa PVC 4" jenis AW + sambungan M1 5.400 Rp40,000.00
Pipa GIP 1 1/2" btg 1.200 Rp294,000.00
Galian tanah untuk rembesan M3 3.375 Rp36,900.00
Pas.ijuk Kg 5.400 Rp7,000.00
Urugan kerikil 3,5 cm M3 1.050 Rp36,500.00
Pipa PVC 4" berlobang jenis AW M1 9.000 Rp58,750.00
Urugan kembali perataan tanah M3 1.125 Rp9,998.00
Pekerja Oh 7.078 Rp38,000.00
Tukang batu Oh 3.000 Rp48,000.00
Kepala tukang batu Oh 0.800 Rp52,000.00
Mandor Oh 0.500 Rp60,000.00
Jumlah
XII.10 1 BUAH POMPA ZET PUMP
Pompa zetpump 250 watt sanyo bh 1.000 Rp4,850,000.00
Pekerja Oh 0.250 Rp38,000.00
Mandor Oh 0.125 Rp60,000.00
Jumlah
TABEL XII.1

SATUAN (AHS) PEKERJAAN INSTALASI AIR

Jumlah Harga Jumlah Harga


Bahan Upah Alat Bahan + Upah
Rp. Rp. Rp. Rp.
6 7 8 9

Rp5,001.00 - -
- - Rp10,500.00
- Rp2,880.00 -
- Rp312.00 -
- Rp1,368.00 -
- Rp108.00 -
Rp5,001.00 Rp4,668.00 Rp10,500.00 Rp20,169.00

Rp25,505.10 - -
- - Rp53,550.00
- Rp2,880.00 -
- Rp312.00 -
- Rp1,368.00 -
- Rp108.00 -
Rp25,505.10 Rp4,668.00 Rp53,550.00 Rp83,723.10

Rp39,174.50 - -
- - Rp82,250.00
- Rp2,880.00 -
- Rp312.00 -
- Rp1,368.00 -
- Rp108.00 -
Rp39,174.50 Rp4,668.00 Rp82,250.00 Rp126,092.50

Rp95,000.00 - -
- - Rp33,250.00
- Rp129,600.00 -
- Rp28,080.00 -
- Rp68,400.00 -
- Rp6,600.00 -
Rp95,000.00 Rp232,680.00 Rp33,250.00 Rp360,930.00

Rp2,745,000.00 - -
- - Rp960,750.00
- Rp129,600.00 -
- Rp28,080.00 -
- Rp68,400.00 -
- Rp6,600.00 -
Rp2,745,000.00 Rp232,680.00 Rp960,750.00 Rp3,938,430.00

Rp22,000.00 - -
- - Rp1,320.00
- Rp1,520.00 -
- Rp2,400.00 -
Rp22,000.00 Rp3,920.00 Rp1,320.00 Rp27,240.00

Rp2,050,000.00 - -
- - Rp123,000.00
- Rp52,800.00 -
- Rp520.00 -
- Rp125,400.00 -
- Rp9,600.00 -
Rp2,050,000.00 Rp188,320.00 Rp123,000.00 Rp2,361,320.00

Rp425,000.00 - -
- - Rp51,000.00
- Rp52,800.00 -
- Rp520.00 -
- Rp125,400.00 -
- Rp9,600.00 -
Rp425,000.00 Rp188,320.00 Rp51,000.00 Rp664,320.00
(KANTOR TYPE KECIL)
Rp166,050.00 - -
Rp10,710.00 - -
Rp128,440.19 - -
Rp1,074,840.00 - -
Rp2,577,423.78 - -
Rp216,000.00 - -
Rp352,800.00 - -
Rp124,537.50 - -
Rp37,800.00 - -
Rp38,325.00 - -
Rp528,750.00 - -
Rp11,247.75 - -
- Rp268,957.03
- Rp144,000.00
- Rp41,600.00
- Rp30,000.00 -
Rp5,266,924.22 Rp484,557.03 Rp0.00 Rp5,751,481.25

Rp4,850,000.00 - -
- Rp9,500.00 -
- Rp7,500.00 -
Rp4,850,000.00 Rp17,000.00 Rp0.00 Rp4,867,000.00
TABEL XII.2

RAB BAHAN PEKERJAAN INSTALASI AIR DAN SANITASI

HARGA SAT JUMLAH HARGA


NO URAIAN PEKERJAAN VOL SAT
BAHAN Biaya Bahan Bid Price Biaya Bahan Pelaksanaan
1 2 3 4 5 6 7
L. PEKERJAAN INSTALASI AIR DAN SANITASI
L.1 Pipa PVC 1'' 13 m' Rp5,001 Rp65,013.00 Rp65,013.00
L.2 Pipa PVC 3'' 7 m' Rp25,505 Rp178,535.70 Rp178,535.70
L.3 Pipa PVC 4" 9 m' Rp39,175 Rp352,570.50 Rp352,570.50
L.4 Bak 2 bh Rp95,000 Rp190,000.00 Rp190,000.00
L.5 Bathtub 2 bh Rp2,745,000 Rp5,490,000.00 Rp5,490,000.00
L.6 Keran 6 bh Rp22,000 Rp132,000.00 Rp132,000.00
L.7 Kloset Duduk 2 bh Rp2,050,000 Rp4,100,000.00 Rp4,100,000.00
L.8 Kitchen zink stainless 2 lobang 1 bh Rp425,000 Rp425,000.00 Rp425,000.00
L.9 Septictank 1 unit Rp5,266,924 Rp5,266,924.22 Rp5,266,924.22
L.10 Pompa Zet Pump 1 unit Rp4,850,000 Rp4,850,000.00 Rp4,850,000.00
Jumlah Rp21,050,043 Rp21,050,043

RAB UPAH PEKERJAAN INSTALASI AIR DAN SANITASI

HARGA SAT JUMLAH HARGA


NO URAIAN PEKERJAAN VOL SAT
NO URAIAN PEKERJAAN VOL SAT
UPAH Biaya Upah Bid Price Biaya Upah Pelaksanaan
1 2 3 4 5 6 7
L. PEKERJAAN PENGECATAN
L.1 Pipa PVC 1'' 13 m' Rp4,668 Rp60,684.00 Rp54,615.60
L.2 Pipa PVC 3'' 7 m' Rp4,668 Rp32,676.00 Rp29,408.40
L.3 Pipa PVC 4" 9 m' Rp4,668 Rp42,012.00 Rp37,810.80
L.4 Bak 2 bh Rp232,680 Rp465,360.00 Rp418,824.00
L.5 Bathtub 2 bh Rp232,680 Rp465,360.00 Rp418,824.00
L.6 Keran 6 bh Rp3,920 Rp23,520.00 Rp21,168.00
L.7 Kloset Duduk 2 bh Rp188,320 Rp376,640.00 Rp338,976.00
L.8 Kitchen zink stainless 2 lobang 1 bh Rp188,320 Rp188,320.00 Rp169,488.00
L.9 Septictank 1 unit Rp484,557 Rp484,557.03 Rp436,101.33
L.10 Pompa Zet Pump 1 unit Rp17,000 Rp17,000.00 Rp15,300.00
Jumlah Rp2,156,129 Rp1,940,516
TABEL XII.3

KEBUTUHAN TENAGA KERJA

Koeff. Koeff.
No. Uraian Jenis pekerjaan Sat. Volume Sat
(Awal) (Akhir)

1 2 3 4 5 6 7
XII PEKERJAAN INSTALASI AIR DAN SANITASI
XII.1 Pipa PVC 1''
Tukang batu Oh 0.0600 0.0540 13.000 m'
Kepala tukang batu Oh 0.0060 0.0054 13.000 m'
Pekerja Oh 0.0360 0.0324 13.000 m'
Mandor Oh 0.0018 0.0016 13.000 m'
Jumlah
XII.2 Pipa PVC 3''
Tukang batu Oh 0.0600 0.0540 7.000 m'
Kepala tukang batu Oh 0.0060 0.0054 7.000 m'
Pekerja Oh 0.0360 0.0324 7.000 m'
Mandor Oh 0.0018 0.0016 7.000 m'
Jumlah
XII.3 Pipa PVC 4"
Tukang batu Oh 0.0600 0.0540 9.000 m'
Kepala tukang batu Oh 0.0060 0.0054 9.000 m'
Pekerja Oh 0.0360 0.0324 9.000 m'
Mandor Oh 0.0018 0.0016 9.000 m'
Jumlah
XII.4 Bak
Tukang batu Oh 2.7000 2.4300 2.000 bh
Kepala tukang batu Oh 0.5400 0.4860 2.000 bh
Pekerja Oh 1.8000 1.6200 2.000 bh
Mandor Oh 0.1100 0.0990 2.000 bh
Jumlah
XII.5 Bathtub
Tukang batu Oh 2.7000 2.4300 2.000 bh
Kepala tukang batu Oh 0.5400 0.4860 2.000 bh
Pekerja Oh 1.8000 1.6200 2.000 bh
Mandor Oh 0.1100 0.0990 2.000 bh
Jumlah
XII.6 Keran
Pekerja Oh 0.0400 0.0360 6.000 bh
Mandor Oh 0.0400 0.0360 6.000 bh
Jumlah
XII.7 Kloset Duduk
Tukang batu Oh 1.1000 0.9900 2.000 bh
Kepala tukang batu Oh 0.0100 0.0090 2.000 bh
Pekerja Oh 3.3000 2.9700 2.000 bh
Mandor Oh 0.1600 0.1440 2.000 bh
Jumlah
XII.8 Kitchen zink stainless 2 lobang
Tukang batu Oh 1.1000 0.9900 1.000 bh
Kepala tukang batu Oh 0.0100 0.0090 1.000 bh
Pekerja Oh 3.3000 2.9700 1.000 bh
Mandor Oh 0.1600 0.1440 1.000 bh
Jumlah
XII.9 Septictank
Pekerja Oh 7.078 6.3700 1.000 unit
Tukang batu Oh 3.000 2.7000 1.000 unit
Kepala tukang batu Oh 0.800 0.7200 1.000 unit
Mandor Oh 0.500 0.4500 1.000 unit
Jumlah
XII.10 Pompa Zet Pump
Pekerja Oh 0.2500 0.2250 1.000 unit
Mandor Oh 0.1250 0.1125 1.000 unit
Jumlah
TABEL XII.3

UTUHAN TENAGA KERJA

Kebutuhan Tenaga Kerja

8=5x6
SI

0.702
0.070
0.421
0.021
1.214

0.378
0.038
0.227
0.011
0.654

0.486
0.049
0.292
0.015
0.841

4.860
0.972
3.240
0.198
9.270

4.860
0.972
3.240
0.198
9.270
0.216
0.216
0.432

1.980
0.018
5.940
0.288
8.226

0.990
0.009
2.970
0.144
4.113

6.370
2.700
0.720
0.450
10.240

0.225
0.113
0.338
TABEL XII.4

ANALISIS PRODUKTIVITAS KERJA

Kebutuhan Tenaga Harga Satuan Durasi Volume


No. Uraian Pekerja Sat Biaya Upah Sat
Kerja Upah (Hari) Pekerjaan
1 2 3 4 5 6=4x5 7 8 9
XII. PEKERJAAN INSTALASI AIR DAN SANITASI
XII.1 Pipa PVC 1''
Tukang batu Oh 0.702 Rp48,000 Rp33,696
Kepala tukang batu Oh 0.070 Rp52,000 Rp3,650
Pekerja Oh 0.421 Rp38,000 Rp16,006 2 13 m'
Mandor Oh 0.021 Rp60,000 Rp1,264
Jumlah Rp54,616
XII. 2 Pipa PVC 3''
Tukang batu Oh 0.378 Rp48,000 Rp18,144
Kepala tukang batu Oh 0.038 Rp52,000 Rp1,966
Pekerja Oh 0.227 Rp38,000 Rp8,618 2 7 m'
Mandor Oh 0.011 Rp60,000 Rp680
Jumlah Rp29,408
XII.3 Pipa PVC 4"
Tukang batu Oh 0.486 Rp48,000 Rp23,328
Kepala tukang batu Oh 0.049 Rp52,000 Rp2,527
2 9 m'
Pekerja Oh 0.292 Rp38,000 Rp11,081
Mandor Oh 0.015 Rp60,000 Rp875
Jumlah Rp37,811
XII.4 Bak
Tukang batu Oh 4.860 Rp48,000 Rp233,280
Kepala tukang batu Oh 0.972 Rp52,000 Rp50,544
Pekerja Oh 3.240 Rp38,000 Rp123,120 2 2 bh
Mandor Oh 0.198 Rp60,000 Rp11,880
Jumlah Rp418,824
XII. 5 Bathtub
Tukang batu Oh 4.860 Rp48,000 Rp233,280
Kepala tukang batu Oh 0.972 Rp52,000 Rp50,544
Pekerja Oh 3.240 Rp38,000 Rp123,120 3 2 bh
Mandor Oh 0.198 Rp60,000 Rp11,880
Jumlah Rp418,824
XII.6 Keran
Pekerja Oh 0.216 Rp38,000 Rp8,208
Mandor Oh 0.216 Rp60,000 Rp12,960 1 6 bh
Jumlah Rp21,168
XII.7 Kloset Duduk
Tukang batu Oh 1.980 Rp48,000 Rp95,040
Kepala tukang batu Oh 0.018 Rp52,000 Rp936
Pekerja Oh 5.940 Rp38,000 Rp225,720 2 2 bh
Mandor Oh 0.288 Rp60,000 Rp17,280
Jumlah Rp338,976
XII. 8 Kitchen zink stainless 2 lobang
Tukang batu Oh 0.990 Rp48,000 Rp47,520
Kepala tukang batu Oh 0.009 Rp52,000 Rp468
Pekerja Oh 2.970 Rp38,000 Rp112,860 1 1 bh
Mandor Oh 0.144 Rp60,000 Rp8,640
Jumlah Rp169,488
XII.9 Septictank
Pekerja Oh 6.370 Rp38,000 Rp242,061
Tukang batu Oh 2.700 Rp48,000 Rp129,600
2 1 unit
Kepala tukang batu Oh 0.720 Rp52,000 Rp37,440
Mandor Oh 0.450 Rp60,000 Rp27,000
Jumlah Rp436,101
XII.10 Pompa Zet Pump
Pekerja Oh 0.225 Rp38,000 Rp8,550
Mandor Oh 0.113 Rp60,000 Rp6,750 1 1.000 unit
Jumlah Rp15,300
TABEL XII.4

ANALISIS PRODUKTIVITAS KERJA

Kebutuhan Tenaga Kerja Produktivitas Kerja Sat


(Per Hari) (Per Hari)
10 = 4 ÷ 7 11 = 8 ÷ 10 12

0.351
0.035
0.211 6.500 m'
0.011

0.189
0.019
0.113 3.500 m'
0.006

0.243
0.024
4.500 m'
0.146
0.007
2.430
0.486
1.620 1.000 bh
0.099

1.620
0.324
1.080 0.667 bh
0.066

0.216
0.216 6.000 bh

0.990
0.009
2.970 1.000 bh
0.144

0.990
0.009
2.970 1.000 bh
0.144
3.185
1.350
0.500 unit
0.360
0.225

0.225
0.113 1.000 unit
TABEL XII.5

ANALISIS BAHAN DAN KEBUTUHAN BAHAN

No. Uraian Jenis pekerjaan Sat. Koeff. Volume Sat Kebutuhan Bahan

1 2 3 4 5 6 7=5x4
XII PEKERJAAN INSTALASI AIR DAN SANITASI
XII.1 Pipa PVC 1''
Pipa PVC maspion abu diameter 1" (AW) bt 0.1667 13.00 m' 2.167

XII.2 Pipa PVC 3''


Pipa PVC maspion abu diameter 3" (AW) bt 0.1667 7.00 m' 1.167

XII.3 Pipa PVC 4"


Pipa PVC maspion abu diameter 4" (AW) bt 0.1667 9.00 m' 1.500

XII.4 Bak
Bak fiberglass bh 1.0000 2.00 bh 2.000

XII.5 Bathtub
Bathtube standard bh 1.0000 2.00 bh 2.000

XII.6 Keran
Kran stainless lokal kait bh 1.0000 6.00 bh 6.000

XII.7 Kloset Duduk


Kloset duduk warna standard TOTO C 240 lengkap bh 1.0000 2.00 bh 2.000

XII.8 Kitchen zink stainless 2 lobang


Kitchen zink stainless 2 lubang bh 1.0000 1.00 bh 1.000

XII.9 Septictank
Galian tanah M3 4.5000 1.00 unit 4.500
Pasir urug M3 0.2142 1.00 unit 0.214
Lantai kerja t = 10 cm M2 2.2500 1.00 unit 2.250
Pas. Bata 1 PC : 2 PS + plesteran M2 15.0000 1.00 unit 15.000
Plat beton penutup dan balok M3 0.3000 1.00 unit 0.300
Pipa PVC 4" jenis AW + sambungan M1 5.4000 1.00 unit 5.400
Pipa GIP 1 1/2" btg 1.2000 1.00 unit 1.200
Galian tanah untuk rembesan M3 3.3750 1.00 unit 3.375
Pas.ijuk Kg 5.4000 1.00 unit 5.400
Urugan kerikil 3,5 cm M3 1.0500 1.00 unit 1.050
Pipa PVC 4" berlobang jenis AW M1 9.0000 1.00 unit 9.000
Urugan kembali perataan tanah M3 1.1250 1.00 unit 1.125

XII.10 Pompa Zet Pump


Pompa zetpump 250 watt sanyo bh 1.0000 1.00 bh 1.000
.5

AHAN DAN KEBUTUHAN BAHAN

Harga Satuan Durasi Kebutuhan Produktivitas/


Sat RAB Bahan Sat Sat
Bahan (Hari) Bahan/Hari Hari

7 8 9 10 11 12 13 14

bt Rp30,000 Rp65,013 1.084 bt


2 6.50 m'
Jumlah Rp65,013

bt Rp153,000 Rp178,536 0.583 bt 3.50 m'


2
Jumlah Rp178,536

bt Rp235,000 Rp352,571 0.750 bt 4.50 m'


2
Jumlah Rp352,571

bh Rp95,000 Rp190,000 0.667 bh 0.67 bh


3
Jumlah Rp190,000
bh Rp2,745,000 Rp5,490,000 0.667 bh 0.67 bh
3
Jumlah Rp5,490,000

bh Rp22,000 Rp132,000 6.000 bh 6.00 bh


1
Jumlah Rp132,000

bh Rp2,050,000 Rp4,100,000 1.000 bh 1.00 bh


2
Jumlah Rp4,100,000

bh Rp425,000 Rp425,000 1.000 bh 1.00 bh


1
Jumlah Rp425,000

M3 Rp36,900 Rp166,050 2.250 M3


M3 Rp50,000 Rp10,710 0.107 M3
M2 Rp57,085 Rp128,440 1.125 M2
M2 Rp71,656 Rp1,074,840 7.500 M2
M3 Rp8,591,413 Rp2,577,424 0.150 M3
M1 Rp40,000 Rp216,000 2.700 M1
0.50 unit
btg Rp294,000 Rp352,800 2 0.600 btg
M3 Rp36,900 Rp124,538 1.688 M3
Kg Rp7,000 Rp37,800 2.700 Kg
0.50 unit
2

M3 Rp36,500 Rp38,325 0.525 M3


M1 Rp58,750 Rp528,750 4.500 M1
M3 Rp9,998 Rp11,248 0.563 M3
Jumlah Rp5,266,924

unit Rp4,850,000 Rp4,850,000 1.000 unit 1.00 unit


1
Jumlah Rp4,850,000
TABEL XII.6
REKAPITULASI

REKAPITULASI UPAH TENAGA KERJA PEKERJAAN INSTALASI AIR BERSIH DAN AIR KOTOR

No. Jenis Pekerja Sat Jumlah Pekerja Sat Harga Satuan RAB Upah Jumlah
Upah Pekerja/Hari
1 Pekerja Oh 23.141 Oh Rp38,000 Rp879,344 2.571
2 Tukang batu Oh 16.956 Oh Rp48,000 Rp813,888 1.884
3 Kepala tukang batu Oh 2.848 Oh Rp52,000 Rp148,075 0.316
4 Mandor Oh 1.653 Oh Rp60,000 Rp99,209 0.184
Jumlah Rp1,940,516 Jumlah

REKAPITULASI BAHAN PEKERJAAN INSTALASI AIR BERSIH DAN AIR KOTOR

No. Jenis Bahan Sat Jumlah Bahan Sat Harga Satuan RAB Bahan Jumlah
Bahan Bahan/Hari
1 Pipa PVC maspion abu diameter 1" (AW) bt 2.167 bt Rp30,000 Rp65,013 0.241
2 Pipa PVC maspion abu diameter 3" (AW) bt 1.167 bt Rp153,000 Rp178,536 0.130
3 Pipa PVC maspion abu diameter 4" (AW) bt 1.500 bt Rp235,000 Rp352,571 0.167
4 Bak fiberglass bh 2.000 bh Rp95,000 Rp190,000 0.222
5 Bathtube standard bh 2.000 bh Rp2,745,000 Rp5,490,000 0.222
6 Kran stainless lokal kait bh 6.000 bh Rp22,000 Rp132,000 0.667
7 Kloset duduk warna standard TOTO C 240 lengkap bh 2.000 bh Rp2,050,000 Rp4,100,000 0.222
8 Kitchen zink stainless 2 lubang bh 1.000 bh Rp425,000 Rp425,000 0.111
9 Galian tanah M3 4.500 M3 Rp36,900 Rp166,050 0.500
10 Pasir urug M3 0.214 M3 Rp50,000 Rp10,710 0.024
11 Lantai kerja t = 10 cm M2 2.250 M2 Rp57,085 Rp128,440 0.250
12 Pas. Bata 1 PC : 2 PS + plesteran M2 15.000 M2 Rp71,656 Rp1,074,840 1.667
13 Plat beton penutup dan balok M3 0.300 M3 Rp8,591,413 Rp2,577,424 0.033
14 Pipa PVC 4" jenis AW + sambungan M1 5.400 M1 Rp40,000 Rp216,000 0.600
15 Pipa GIP 1 1/2" btg 1.200 btg Rp294,000 Rp352,800 0.133
16 Galian tanah untuk rembesan M3 3.375 M3 Rp36,900 Rp124,538 0.375
17 Pas.ijuk Kg 5.400 Kg Rp7,000 Rp37,800 0.600
18 Urugan kerikil 3,5 cm M3 1.050 M3 Rp36,500 Rp38,325 0.117
19 Pipa PVC 4" berlobang jenis AW M1 9.000 M1 Rp58,750 Rp528,750 1.000
20 Urugan kembali perataan tanah M3 1.125 M3 Rp9,998 Rp11,248 0.125
21 Pompa zetpump 250 watt sanyo bh 1.000 bh Rp4,850,000 Rp4,850,000 0.111
Jumlah Rp21,050,043 Jumlah
Biaya
Upah/Hari
Rp97,705
Rp90,432
Rp16,453
Rp11,023
Rp215,613

Biaya
Bahan/Hari
Rp7,224
Rp19,837
Rp39,175
Rp21,111
Rp610,000
Rp14,667
Rp455,556
Rp47,222
Rp18,450
Rp1,190
Rp14,271
Rp119,427
Rp286,380
Rp24,000
Rp39,200
Rp13,838
Rp4,200
Rp4,258
Rp58,750
Rp1,250
Rp538,889
Rp2,338,894
RAB BAHAN PEKERJAAN INSTALASI AIR DAN SANITASI

HARGA SAT JUMLAH HARGA


NO URAIAN PEKERJAAN VOL SAT
BAHAN Biaya Bahan Bid Price Biaya Bahan Pelaksanaan
1 2 3 4 5 6 7
L. PEKERJAAN INSTALASI AIR DAN SANITASI
L.1 Pipa PVC 1'' 47 m' Rp5,001 Rp235,047.00 Rp235,047.00
L.2 Pipa PVC 3'' 47 m' Rp25,505 Rp1,198,739.70 Rp1,198,739.70
L.3 Pipa PVC 4" 60 m' Rp39,175 Rp2,350,470.00 Rp2,350,470.00
L.4 Bak 3 bh Rp95,000 Rp285,000.00 Rp285,000.00
L.5 Bathtub 2 bh Rp2,745,000 Rp5,490,000.00 Rp5,490,000.00
L.6 Keran 6 bh Rp22,000 Rp132,000.00 Rp132,000.00
L.7 Kloset Duduk 4 bh Rp2,050,000 Rp8,200,000.00 Rp8,200,000.00
L.8 Kitchen zink stainless 2 lobang 1 bh Rp425,000 Rp425,000.00 Rp425,000.00
L.9 Septictank 1 unit Rp5,266,924 Rp5,266,924.22 Rp5,266,924.22
L.10 Pompa Zet Pump 1 unit Rp4,850,000 Rp4,850,000.00 Rp4,850,000.00
Jumlah Rp28,433,181 Rp28,433,181

RAB UPAH PEKERJAAN INSTALASI AIR DAN SANITASI

HARGA SAT JUMLAH HARGA


NO URAIAN PEKERJAAN VOL SAT
UPAH Biaya Upah Bid Price Biaya Upah Pelaksanaan
1 2 3 4 5 6 7
L. PEKERJAAN PENGECATAN
L.1 Pipa PVC 1'' 47 m' Rp4,668 Rp219,396.00 Rp197,456.40
L.2 Pipa PVC 3'' 47 m' Rp4,668 Rp219,396.00 Rp197,456.40
L.3 Pipa PVC 4" 60 m' Rp4,668 Rp280,080.00 Rp252,072.00
L.4 Bak 3 bh Rp232,680 Rp698,040.00 Rp628,236.00
L.5 Bathtub 2 bh Rp232,680 Rp465,360.00 Rp418,824.00
L.6 Keran 6 bh Rp3,920 Rp23,520.00 Rp21,168.00
L.7 Kloset Duduk 4 bh Rp188,320 Rp753,280.00 Rp677,952.00
L.8 Kitchen zink stainless 2 lobang 1 bh Rp188,320 Rp188,320.00 Rp169,488.00
L.9 Septictank 1 unit Rp484,557 Rp484,557.03 Rp436,101.33
L.10 Pompa Zet Pump 1 unit Rp17,000 Rp17,000.00 Rp15,300.00
Jumlah Rp3,348,949 Rp3,014,054
REKAPITULASI UPAH TENAGA KERJA PEKERJAAN INSTALASI AIR BERSIH DAN AIR KOTOR
Jumlah
No. Jenis Pekerja Sat Jumlah Pekerja Sat RAB Upah Pekerja/
Harga Satuan Upah Hari
1 Pekerja Oh 34.751 Oh Rp38,000 Rp1,320,524 4.964
2 Tukang batu Oh 28.116 Oh Rp48,000 Rp1,349,568 4.017
3 Kepala tukang batu Oh 4.027 Oh Rp52,000 Rp209,383 0.575
4 Mandor Oh 2.243 Oh Rp60,000 Rp134,579 0.320
Jumlah Rp3,014,054 Jumlah

REKAPITULASI BAHAN PEKERJAAN INSTALASI AIR BERSIH DAN AIR KOTOR


Jumlah
No. Jenis Bahan Sat Jumlah Bahan Sat RAB Bahan Bahan/H
Harga Satuan Bahan ari
1 Pipa PVC maspion abu diameter 1" (AW) bt 7.835 bt Rp30,000 Rp235,047 1.119
2 Pipa PVC maspion abu diameter 3" (AW) bt 7.835 bt Rp153,000 Rp1,198,740 1.119
3 Pipa PVC maspion abu diameter 4" (AW) bt 10.002 bt Rp235,000 Rp2,350,470 1.429
4 Bak fiberglass bh 3.000 bh Rp95,000 Rp285,000 0.429
5 Bathtube standard bh 2.000 bh Rp2,745,000 Rp5,490,000 0.286
6 Kran stainless lokal kait bh 6.000 bh Rp22,000 Rp132,000 0.857
7 Kloset duduk warna standard TOTO C 240 lengkap bh 4.000 bh Rp2,050,000 Rp8,200,000 0.571
8 Kitchen zink stainless 2 lubang bh 1.000 bh Rp425,000 Rp425,000 0.143
9 Galian tanah M3 4.500 M3 Rp36,900 Rp166,050 0.643
10 Pasir urug M3 0.214 M3 Rp50,000 Rp10,710 0.031
11 Lantai kerja t = 10 cm M2 2.250 M2 Rp57,085 Rp128,440 0.321
12 Pas. Bata 1 PC : 2 PS + plesteran M2 15.000 M2 Rp71,656 Rp1,074,840 2.143
13 Plat beton penutup dan balok M3 0.300 M3 Rp8,591,413 Rp2,577,424 0.043
14 Pipa PVC 4" jenis AW + sambungan M1 5.400 M1 Rp40,000 Rp216,000 0.771
15 Pipa GIP 1 1/2" btg 1.200 btg Rp294,000 Rp352,800 0.171
16 Galian tanah untuk rembesan M3 3.375 M3 Rp36,900 Rp124,538 0.482
17 Pas.ijuk Kg 5.400 Kg Rp7,000 Rp37,800 0.771
18 Urugan kerikil 3,5 cm M3 1.050 M3 Rp36,500 Rp38,325 0.150
19 Pipa PVC 4" berlobang jenis AW M1 9.000 M1 Rp58,750 Rp528,750 1.286
20 Urugan kembali perataan tanah M3 1.125 M3 Rp9,998 Rp11,248 0.161
21 Pompa zetpump 250 watt sanyo bh 1.000 bh Rp4,850,000 Rp4,850,000 0.143
Jumlah Rp28,433,181 Jumlah
Biaya
Upah/Hari
Rp188,646
Rp192,795
Rp29,912
Rp19,226
Rp430,579

Biaya
Bahan/Hari
Rp33,578
Rp171,249
Rp335,781
Rp40,714
Rp784,286
Rp18,857
Rp1,171,429
Rp60,714
Rp23,721
Rp1,530
Rp18,349
Rp153,549
Rp368,203
Rp30,857
Rp50,400
Rp17,791
Rp5,400
Rp5,475
Rp75,536
Rp1,607
Rp692,857
Rp4,061,883
KEBUTUHAN TENAGA KERJA

Koeff. Koeff.
No. Uraian Jenis pekerjaan Sat. Volume Sat
(Awal) (Akhir)

1 2 3 4 5 6 7
XII PEKERJAAN INSTALASI AIR DAN SANITASI
XII.1 Pipa PVC 1''
Tukang batu Oh 0.0600 0.0540 47.000 m'
Kepala tukang batu Oh 0.0060 0.0054 47.000 m'
Pekerja Oh 0.0360 0.0324 47.000 m'
Mandor Oh 0.0018 0.0016 47.000 m'
Jumlah
XII.2 Pipa PVC 3''
Tukang batu Oh 0.0600 0.0540 47.000 m'
Kepala tukang batu Oh 0.0060 0.0054 47.000 m'
Pekerja Oh 0.0360 0.0324 47.000 m'
Mandor Oh 0.0018 0.0016 47.000 m'
Jumlah
XII.3 Pipa PVC 4"
Tukang batu Oh 0.0600 0.0540 60.000 m'
Kepala tukang batu Oh 0.0060 0.0054 60.000 m'
Pekerja Oh 0.0360 0.0324 60.000 m'
Mandor Oh 0.0018 0.0016 60.000 m'
Jumlah
XII.4 Bak
Tukang batu Oh 2.7000 2.4300 3.000 bh
Kepala tukang batu Oh 0.5400 0.4860 3.000 bh
Pekerja Oh 1.8000 1.6200 3.000 bh
Mandor Oh 0.1100 0.0990 3.000 bh
Jumlah
XII.5 Bathtub
Tukang batu Oh 2.7000 2.4300 2.000 bh
Kepala tukang batu Oh 0.5400 0.4860 2.000 bh
Pekerja Oh 1.8000 1.6200 2.000 bh
Mandor Oh 0.1100 0.0990 2.000 bh
Jumlah
XII.6 Keran
Pekerja Oh 0.0400 0.0360 6.000 bh
Mandor Oh 0.0400 0.0360 6.000 bh
Jumlah
XII.7 Kloset Duduk
Tukang batu Oh 1.1000 0.9900 4.000 bh
Kepala tukang batu Oh 0.0100 0.0090 4.000 bh
Pekerja Oh 3.3000 2.9700 4.000 bh
Mandor Oh 0.1600 0.1440 4.000 bh
Jumlah
XII.8 Kitchen zink stainless 2 lobang
Tukang batu Oh 1.1000 0.9900 1.000 bh
Kepala tukang batu Oh 0.0100 0.0090 1.000 bh
Pekerja Oh 3.3000 2.9700 1.000 bh
Mandor Oh 0.1600 0.1440 1.000 bh
Jumlah
XII.9 Septictank
Pekerja Oh 7.078 6.3700 1.000 unit
Tukang batu Oh 3.000 2.7000 1.000 unit
Kepala tukang batu Oh 0.800 0.7200 1.000 unit
Mandor Oh 0.500 0.4500 1.000 unit
Jumlah
XII.10 Pompa Zet Pump
Pekerja Oh 0.2500 0.2250 1.000 unit
Mandor Oh 0.1250 0.1125 1.000 unit
Jumlah

ANALISIS BAHAN DAN KEBUTU

No. Uraian Jenis pekerjaan Sat. Koeff. Volume SatKebutuhan Bahan

1 2 3 4 5 6 7=5x4
XII PEKERJAAN INSTALASI AIR DAN SANITASI
XII.1 Pipa PVC 1''
Pipa PVC maspion abu diameter 1" (AW) bt 0.1667 47.00 m' 7.835

XII.2 Pipa PVC 3''


Pipa PVC maspion abu diameter 3" (AW) bt 0.1667 47.00 m' 7.835

XII.3 Pipa PVC 4"


Pipa PVC maspion abu diameter 4" (AW) bt 0.1667 60.00 m' 10.002

XII.4 Bak
Bak fiberglass bh 1.0000 3.00 bh 3.000

XII.5 Bathtub
Bathtube standard bh 1.0000 2.00 bh 2.000

XII.6 Keran
Kran stainless lokal kait bh 1.0000 6.00 bh 6.000

XII.7 Kloset Duduk


Kloset duduk warna standard TOTO C 240 lengkap bh 1.0000 4.00 bh 4.000
XII.8 Kitchen zink stainless 2 lobang
Kitchen zink stainless 2 lubang bh 1.0000 1.00 bh 1.000

XII.9 Septictank
Galian tanah M3 4.5000 1.00 unit 4.500
Pasir urug M3 0.2142 1.00 unit 0.214
Lantai kerja t = 10 cm M2 2.2500 1.00 unit 2.250
Pas. Bata 1 PC : 2 PS + plesteran M2 15.0000 1.00 unit 15.000
Plat beton penutup dan balok M3 0.3000 1.00 unit 0.300
Pipa PVC 4" jenis AW + sambungan M1 5.4000 1.00 unit 5.400
Pipa GIP 1 1/2" btg 1.2000 1.00 unit 1.200
Galian tanah untuk rembesan M3 3.3750 1.00 unit 3.375
Pas.ijuk Kg 5.4000 1.00 unit 5.400
Urugan kerikil 3,5 cm M3 1.0500 1.00 unit 1.050
Pipa PVC 4" berlobang jenis AW M1 9.0000 1.00 unit 9.000
Urugan kembali perataan tanah M3 1.1250 1.00 unit 1.125

XII.10 Pompa Zet Pump


Pompa zetpump 250 watt sanyo bh 1.0000 1.00 bh 1.000
ANALISIS PRODUKTIVITAS KERJA

Kebutuhan Harga Durasi


Kebutuhan No. Uraian Pekerja Sat Satuan Biaya Upah
Tenaga Kerja (Hari)
Tenaga Kerja Upah
1 2 3 4 5 6=4x5 7
8=5x6 XII. PEKERJAAN INSTALASI AIR DAN SANITASI
XII.1 Pipa PVC 1''
Tukang batu Oh 2.538 Rp48,000 Rp121,824
2.538 Kepala tukang batu Oh 0.254 Rp52,000 Rp13,198
0.254 Pekerja Oh 1.523 Rp38,000 Rp57,866 2
1.523 Mandor Oh 0.076 Rp60,000 Rp4,568
0.076 Jumlah Rp197,456
4.391 XII. 2 Pipa PVC 3''
Tukang batu Oh 2.538 Rp48,000 Rp121,824
2.538 Kepala tukang batu Oh 0.254 Rp52,000 Rp13,198
0.254 Pekerja Oh 1.523 Rp38,000 Rp57,866 2
1.523 Mandor Oh 0.076 Rp60,000 Rp4,568
0.076 Jumlah Rp197,456
4.391 XII.3 Pipa PVC 4"
Tukang batu Oh 3.240 Rp48,000 Rp155,520
3.240 Kepala tukang batu Oh 0.324 Rp52,000 Rp16,848
2
0.324 Pekerja Oh 1.944 Rp38,000 Rp73,872
1.944 Mandor Oh 0.097 Rp60,000 Rp5,832
0.097 Jumlah Rp252,072
5.605 XII.4 Bak
Tukang batu Oh 7.290 Rp48,000 Rp349,920
7.290 Kepala tukang batu Oh 1.458 Rp52,000 Rp75,816
1.458 Pekerja Oh 4.860 Rp38,000 Rp184,680 2
4.860 Mandor Oh 0.297 Rp60,000 Rp17,820
0.297 Jumlah Rp628,236
13.905 XII. 5 Bathtub
Tukang batu Oh 4.860 Rp48,000 Rp233,280
4.860 Kepala tukang batu Oh 0.972 Rp52,000 Rp50,544
0.972 Pekerja Oh 3.240 Rp38,000 Rp123,120 3
3.240 Mandor Oh 0.198 Rp60,000 Rp11,880
0.198 Jumlah Rp418,824
9.270 XII.6 Keran
Pekerja Oh 0.216 Rp38,000 Rp8,208
0.216 Mandor Oh 0.216 Rp60,000 Rp12,960 1
0.216 Jumlah Rp21,168
0.432 XII.7 Kloset Duduk
Tukang batu Oh 3.960 Rp48,000 Rp190,080
3.960 Kepala tukang batu Oh 0.036 Rp52,000 Rp1,872
0.036 Pekerja Oh 11.880 Rp38,000 Rp451,440 2
11.880 Mandor Oh 0.576 Rp60,000 Rp34,560
2

0.576 Jumlah Rp677,952


16.452 XII. 8 Kitchen zink stainless 2 lobang
Tukang batu Oh 0.990 Rp48,000 Rp47,520
0.990 Kepala tukang batu Oh 0.009 Rp52,000 Rp468
0.009 Pekerja Oh 2.970 Rp38,000 Rp112,860 1
2.970 Mandor Oh 0.144 Rp60,000 Rp8,640
0.144 Jumlah Rp169,488
4.113 XII.9 Septictank
Pekerja Oh 6.370 Rp38,000 Rp242,061
6.370 Tukang batu Oh 2.700 Rp48,000 Rp129,600
2
2.700 Kepala tukang batu Oh 0.720 Rp52,000 Rp37,440
0.720 Mandor Oh 0.450 Rp60,000 Rp27,000
0.450 Jumlah Rp436,101
10.240 XII.10 Pompa Zet Pump
Pekerja Oh 0.225 Rp38,000 Rp8,550
0.225 Mandor Oh 0.113 Rp60,000 Rp6,750 1
0.113 Jumlah Rp15,300
0.338

N DAN KEBUTUHAN BAHAN

Harga Satuan Durasi Kebutuhan


Sat RAB Bahan Sat Produktivitas/Hari Sat
Bahan (Hari) Bahan/Hari

7 8 9 10 11 12 13 14

bt Rp30,000 Rp235,047 3.917 bt


2 23.50 m'
Jumlah Rp235,047

bt Rp153,000 Rp1,198,740 3.917 bt 23.50 m'


2
Jumlah Rp1,198,740

bt Rp235,000 Rp2,350,470 5.001 bt 30.00 m'


2
Jumlah Rp2,350,470

bh Rp95,000 Rp285,000 1.000 bh 1.00 bh


3
Jumlah Rp285,000

bh Rp2,745,000 Rp5,490,000 0.667 bh 0.67 bh


3
Jumlah Rp5,490,000

bh Rp22,000 Rp132,000 6.000 bh 6.00 bh


1
Jumlah Rp132,000

bh Rp2,050,000 Rp8,200,000 2.000 bh 2.00 bh


2
2
Jumlah Rp8,200,000

bh Rp425,000 Rp425,000 1.000 bh 1.00 bh


1
Jumlah Rp425,000

M3 Rp36,900 Rp166,050 2.250 M3


M3 Rp50,000 Rp10,710 0.107 M3
M2 Rp57,085 Rp128,440 1.125 M2
M2 Rp71,656 Rp1,074,840 7.500 M2
M3 Rp8,591,413 Rp2,577,424 0.150 M3
M1 Rp40,000 Rp216,000 2.700 M1
0.50 unit
btg Rp294,000 Rp352,800 2 0.600 btg
M3 Rp36,900 Rp124,538 1.688 M3
Kg Rp7,000 Rp37,800 2.700 Kg
M3 Rp36,500 Rp38,325 0.525 M3
M1 Rp58,750 Rp528,750 4.500 M1
M3 Rp9,998 Rp11,248 0.563 M3
Jumlah Rp5,266,924

unit Rp4,850,000 Rp4,850,000 1.000 unit 1.00 unit


1
Jumlah Rp4,850,000
JA
Kebutuhan
Volume Tenaga Kerja Produktivitas
Sat Sat
Pekerjaan (Per Hari) Kerja (Per Hari)
8 9 10 = 4 ÷ 7 11 = 8 ÷ 10 12

1.269
0.127
47 m' 0.761 23.500 m'
0.038

1.269
0.127
47 m' 0.761 23.500 m'
0.038

1.620
0.162
60 m' 30.000 m'
0.972
0.049

3.645
0.729
3 bh 2.430 1.500 bh
0.149

1.620
0.324
2 bh 1.080 0.667 bh
0.066

0.216
6 bh 0.216 6.000 bh

1.980
0.018
4.000 bh 5.940 2.000 bh
0.288
4.000 bh 2.000 bh

0.990
0.009
1 bh 2.970 1.000 bh
0.144

3.185
1.350
1.000 unit 0.500 unit
0.360
0.225

0.225
1.000 unit 0.113 1.000 unit

Anda mungkin juga menyukai