Harga Sat.
No. Uraian Jenis pekerjaan Sat. Koeff. Bahan / Upah / Alat
Rp.
1 2 3 4 5
XII PEKERJAAN INSTALASI AIR DAN SANITASI
XII.1 1 M' PIPA PVC MASPION ABU DIAMETER 1"
Pipa PVC maspion abu diameter 1" (AW) bt 0.167 Rp30,000.00
Perlengkapan (35% x harga pipa) lot 1.000 Rp10,500.00
Tukang batu Oh 0.060 Rp48,000.00
Kepala tukang batu Oh 0.006 Rp52,000.00
Pekerja Oh 0.036 Rp38,000.00
Mandor Oh 0.002 Rp60,000.00
Jumlah
XII.2 1 M' PIPA PVC MASPION ABU DIAMETER 3"
Pipa PVC maspion abu diameter 3" (AW) bt 0.167 Rp153,000.00
Perlengkapan (35% x harga pipa) lot 1.000 Rp53,550.00
Tukang batu Oh 0.060 Rp48,000.00
Kepala tukang batu Oh 0.006 Rp52,000.00
Pekerja Oh 0.036 Rp38,000.00
Mandor Oh 0.002 Rp60,000.00
Jumlah
XII.3 1 M' PIPA PVC MASPION ABU DIAMETER 4"
Pipa PVC maspion abu diameter 4" (AW) bt 0.167 Rp235,000.00
Perlengkapan (35% x harga pipa) lot 1.000 Rp82,250.00
Tukang batu Oh 0.060 Rp48,000.00
Kepala tukang batu Oh 0.006 Rp52,000.00
Pekerja Oh 0.036 Rp38,000.00
Mandor Oh 0.002 Rp60,000.00
Jumlah
XII.4 1 BUAH BAK MANDI FIBERGLASS 60 x 60
Bak fiberglass bh 1.000 Rp95,000.00
Perlengkapan (35% x harga pipa) lot 1.000 Rp33,250.00
Tukang batu Oh 2.700 Rp48,000.00
Kepala tukang batu Oh 0.540 Rp52,000.00
Pekerja Oh 1.800 Rp38,000.00
Mandor Oh 0.110 Rp60,000.00
Jumlah
XII.5 1 BUAH BATHTUBE
Bathtube standard bh 1.000 Rp2,745,000.00
Perlengkapan (35% x harga pipa) lot 1.000 Rp960,750.00
Tukang batu Oh 2.700 Rp48,000.00
Kepala tukang batu Oh 0.540 Rp52,000.00
Pekerja Oh 1.800 Rp38,000.00
Mandor Oh 0.110 Rp60,000.00
Jumlah
XII.6 1 BUAH KERAN
Kran stainless lokal kait bh 1.000 Rp22,000.00
Perlengkapan (6% x harga pipa) lot 1.000 Rp1,320.00
Pekerja Oh 0.040 Rp38,000.00
Mandor Oh 0.040 Rp60,000.00
Jumlah
XII.7 1 KLOSET DUDUK
Kloset duduk warna standard TOTO C 240 lengkap bh 1.000 Rp2,050,000.00
Perlengkapan (6% x harga pipa) lot 1.000 Rp123,000.00
Tukang batu Oh 1.100 Rp48,000.00
Kepala tukang batu Oh 0.010 Rp52,000.00
Pekerja Oh 3.300 Rp38,000.00
Mandor Oh 0.160 Rp60,000.00
Jumlah
XII.8 1 KITCHEN ZINK STAINLESS 2 LUBANG
Kitchen zink stainless 2 lubang bh 1.000 Rp425,000.00
Perlengkapan (612% x harga pipa) lot 1.000 Rp51,000.00
Tukang batu Oh 1.100 Rp48,000.00
Kepala tukang batu Oh 0.010 Rp52,000.00
Pekerja Oh 3.300 Rp38,000.00
Mandor Oh 0.160 Rp60,000.00
Jumlah
XII.9 1 UNIT SEPTICTANK 2 X 1,5 X 1,5 M + REMBESANNYA (KANTOR TYPE KECIL)
Galian tanah M3 4.500 Rp36,900.00
Pasir urug M3 0.214 Rp50,000.00
Lantai kerja t = 10 cm M2 2.250 Rp57,084.53
Pas. Bata 1 PC : 2 PS + plesteran M2 15.000 Rp71,656.00
Plat beton penutup dan balok M3 0.300 Rp8,591,412.59
Pipa PVC 4" jenis AW + sambungan M1 5.400 Rp40,000.00
Pipa GIP 1 1/2" btg 1.200 Rp294,000.00
Galian tanah untuk rembesan M3 3.375 Rp36,900.00
Pas.ijuk Kg 5.400 Rp7,000.00
Urugan kerikil 3,5 cm M3 1.050 Rp36,500.00
Pipa PVC 4" berlobang jenis AW M1 9.000 Rp58,750.00
Urugan kembali perataan tanah M3 1.125 Rp9,998.00
Pekerja Oh 7.078 Rp38,000.00
Tukang batu Oh 3.000 Rp48,000.00
Kepala tukang batu Oh 0.800 Rp52,000.00
Mandor Oh 0.500 Rp60,000.00
Jumlah
XII.10 1 BUAH POMPA ZET PUMP
Pompa zetpump 250 watt sanyo bh 1.000 Rp4,850,000.00
Pekerja Oh 0.250 Rp38,000.00
Mandor Oh 0.125 Rp60,000.00
Jumlah
TABEL XII.1
Rp5,001.00 - -
- - Rp10,500.00
- Rp2,880.00 -
- Rp312.00 -
- Rp1,368.00 -
- Rp108.00 -
Rp5,001.00 Rp4,668.00 Rp10,500.00 Rp20,169.00
Rp25,505.10 - -
- - Rp53,550.00
- Rp2,880.00 -
- Rp312.00 -
- Rp1,368.00 -
- Rp108.00 -
Rp25,505.10 Rp4,668.00 Rp53,550.00 Rp83,723.10
Rp39,174.50 - -
- - Rp82,250.00
- Rp2,880.00 -
- Rp312.00 -
- Rp1,368.00 -
- Rp108.00 -
Rp39,174.50 Rp4,668.00 Rp82,250.00 Rp126,092.50
Rp95,000.00 - -
- - Rp33,250.00
- Rp129,600.00 -
- Rp28,080.00 -
- Rp68,400.00 -
- Rp6,600.00 -
Rp95,000.00 Rp232,680.00 Rp33,250.00 Rp360,930.00
Rp2,745,000.00 - -
- - Rp960,750.00
- Rp129,600.00 -
- Rp28,080.00 -
- Rp68,400.00 -
- Rp6,600.00 -
Rp2,745,000.00 Rp232,680.00 Rp960,750.00 Rp3,938,430.00
Rp22,000.00 - -
- - Rp1,320.00
- Rp1,520.00 -
- Rp2,400.00 -
Rp22,000.00 Rp3,920.00 Rp1,320.00 Rp27,240.00
Rp2,050,000.00 - -
- - Rp123,000.00
- Rp52,800.00 -
- Rp520.00 -
- Rp125,400.00 -
- Rp9,600.00 -
Rp2,050,000.00 Rp188,320.00 Rp123,000.00 Rp2,361,320.00
Rp425,000.00 - -
- - Rp51,000.00
- Rp52,800.00 -
- Rp520.00 -
- Rp125,400.00 -
- Rp9,600.00 -
Rp425,000.00 Rp188,320.00 Rp51,000.00 Rp664,320.00
(KANTOR TYPE KECIL)
Rp166,050.00 - -
Rp10,710.00 - -
Rp128,440.19 - -
Rp1,074,840.00 - -
Rp2,577,423.78 - -
Rp216,000.00 - -
Rp352,800.00 - -
Rp124,537.50 - -
Rp37,800.00 - -
Rp38,325.00 - -
Rp528,750.00 - -
Rp11,247.75 - -
- Rp268,957.03
- Rp144,000.00
- Rp41,600.00
- Rp30,000.00 -
Rp5,266,924.22 Rp484,557.03 Rp0.00 Rp5,751,481.25
Rp4,850,000.00 - -
- Rp9,500.00 -
- Rp7,500.00 -
Rp4,850,000.00 Rp17,000.00 Rp0.00 Rp4,867,000.00
TABEL XII.2
Koeff. Koeff.
No. Uraian Jenis pekerjaan Sat. Volume Sat
(Awal) (Akhir)
1 2 3 4 5 6 7
XII PEKERJAAN INSTALASI AIR DAN SANITASI
XII.1 Pipa PVC 1''
Tukang batu Oh 0.0600 0.0540 13.000 m'
Kepala tukang batu Oh 0.0060 0.0054 13.000 m'
Pekerja Oh 0.0360 0.0324 13.000 m'
Mandor Oh 0.0018 0.0016 13.000 m'
Jumlah
XII.2 Pipa PVC 3''
Tukang batu Oh 0.0600 0.0540 7.000 m'
Kepala tukang batu Oh 0.0060 0.0054 7.000 m'
Pekerja Oh 0.0360 0.0324 7.000 m'
Mandor Oh 0.0018 0.0016 7.000 m'
Jumlah
XII.3 Pipa PVC 4"
Tukang batu Oh 0.0600 0.0540 9.000 m'
Kepala tukang batu Oh 0.0060 0.0054 9.000 m'
Pekerja Oh 0.0360 0.0324 9.000 m'
Mandor Oh 0.0018 0.0016 9.000 m'
Jumlah
XII.4 Bak
Tukang batu Oh 2.7000 2.4300 2.000 bh
Kepala tukang batu Oh 0.5400 0.4860 2.000 bh
Pekerja Oh 1.8000 1.6200 2.000 bh
Mandor Oh 0.1100 0.0990 2.000 bh
Jumlah
XII.5 Bathtub
Tukang batu Oh 2.7000 2.4300 2.000 bh
Kepala tukang batu Oh 0.5400 0.4860 2.000 bh
Pekerja Oh 1.8000 1.6200 2.000 bh
Mandor Oh 0.1100 0.0990 2.000 bh
Jumlah
XII.6 Keran
Pekerja Oh 0.0400 0.0360 6.000 bh
Mandor Oh 0.0400 0.0360 6.000 bh
Jumlah
XII.7 Kloset Duduk
Tukang batu Oh 1.1000 0.9900 2.000 bh
Kepala tukang batu Oh 0.0100 0.0090 2.000 bh
Pekerja Oh 3.3000 2.9700 2.000 bh
Mandor Oh 0.1600 0.1440 2.000 bh
Jumlah
XII.8 Kitchen zink stainless 2 lobang
Tukang batu Oh 1.1000 0.9900 1.000 bh
Kepala tukang batu Oh 0.0100 0.0090 1.000 bh
Pekerja Oh 3.3000 2.9700 1.000 bh
Mandor Oh 0.1600 0.1440 1.000 bh
Jumlah
XII.9 Septictank
Pekerja Oh 7.078 6.3700 1.000 unit
Tukang batu Oh 3.000 2.7000 1.000 unit
Kepala tukang batu Oh 0.800 0.7200 1.000 unit
Mandor Oh 0.500 0.4500 1.000 unit
Jumlah
XII.10 Pompa Zet Pump
Pekerja Oh 0.2500 0.2250 1.000 unit
Mandor Oh 0.1250 0.1125 1.000 unit
Jumlah
TABEL XII.3
8=5x6
SI
0.702
0.070
0.421
0.021
1.214
0.378
0.038
0.227
0.011
0.654
0.486
0.049
0.292
0.015
0.841
4.860
0.972
3.240
0.198
9.270
4.860
0.972
3.240
0.198
9.270
0.216
0.216
0.432
1.980
0.018
5.940
0.288
8.226
0.990
0.009
2.970
0.144
4.113
6.370
2.700
0.720
0.450
10.240
0.225
0.113
0.338
TABEL XII.4
0.351
0.035
0.211 6.500 m'
0.011
0.189
0.019
0.113 3.500 m'
0.006
0.243
0.024
4.500 m'
0.146
0.007
2.430
0.486
1.620 1.000 bh
0.099
1.620
0.324
1.080 0.667 bh
0.066
0.216
0.216 6.000 bh
0.990
0.009
2.970 1.000 bh
0.144
0.990
0.009
2.970 1.000 bh
0.144
3.185
1.350
0.500 unit
0.360
0.225
0.225
0.113 1.000 unit
TABEL XII.5
No. Uraian Jenis pekerjaan Sat. Koeff. Volume Sat Kebutuhan Bahan
1 2 3 4 5 6 7=5x4
XII PEKERJAAN INSTALASI AIR DAN SANITASI
XII.1 Pipa PVC 1''
Pipa PVC maspion abu diameter 1" (AW) bt 0.1667 13.00 m' 2.167
XII.4 Bak
Bak fiberglass bh 1.0000 2.00 bh 2.000
XII.5 Bathtub
Bathtube standard bh 1.0000 2.00 bh 2.000
XII.6 Keran
Kran stainless lokal kait bh 1.0000 6.00 bh 6.000
XII.9 Septictank
Galian tanah M3 4.5000 1.00 unit 4.500
Pasir urug M3 0.2142 1.00 unit 0.214
Lantai kerja t = 10 cm M2 2.2500 1.00 unit 2.250
Pas. Bata 1 PC : 2 PS + plesteran M2 15.0000 1.00 unit 15.000
Plat beton penutup dan balok M3 0.3000 1.00 unit 0.300
Pipa PVC 4" jenis AW + sambungan M1 5.4000 1.00 unit 5.400
Pipa GIP 1 1/2" btg 1.2000 1.00 unit 1.200
Galian tanah untuk rembesan M3 3.3750 1.00 unit 3.375
Pas.ijuk Kg 5.4000 1.00 unit 5.400
Urugan kerikil 3,5 cm M3 1.0500 1.00 unit 1.050
Pipa PVC 4" berlobang jenis AW M1 9.0000 1.00 unit 9.000
Urugan kembali perataan tanah M3 1.1250 1.00 unit 1.125
7 8 9 10 11 12 13 14
REKAPITULASI UPAH TENAGA KERJA PEKERJAAN INSTALASI AIR BERSIH DAN AIR KOTOR
No. Jenis Pekerja Sat Jumlah Pekerja Sat Harga Satuan RAB Upah Jumlah
Upah Pekerja/Hari
1 Pekerja Oh 23.141 Oh Rp38,000 Rp879,344 2.571
2 Tukang batu Oh 16.956 Oh Rp48,000 Rp813,888 1.884
3 Kepala tukang batu Oh 2.848 Oh Rp52,000 Rp148,075 0.316
4 Mandor Oh 1.653 Oh Rp60,000 Rp99,209 0.184
Jumlah Rp1,940,516 Jumlah
No. Jenis Bahan Sat Jumlah Bahan Sat Harga Satuan RAB Bahan Jumlah
Bahan Bahan/Hari
1 Pipa PVC maspion abu diameter 1" (AW) bt 2.167 bt Rp30,000 Rp65,013 0.241
2 Pipa PVC maspion abu diameter 3" (AW) bt 1.167 bt Rp153,000 Rp178,536 0.130
3 Pipa PVC maspion abu diameter 4" (AW) bt 1.500 bt Rp235,000 Rp352,571 0.167
4 Bak fiberglass bh 2.000 bh Rp95,000 Rp190,000 0.222
5 Bathtube standard bh 2.000 bh Rp2,745,000 Rp5,490,000 0.222
6 Kran stainless lokal kait bh 6.000 bh Rp22,000 Rp132,000 0.667
7 Kloset duduk warna standard TOTO C 240 lengkap bh 2.000 bh Rp2,050,000 Rp4,100,000 0.222
8 Kitchen zink stainless 2 lubang bh 1.000 bh Rp425,000 Rp425,000 0.111
9 Galian tanah M3 4.500 M3 Rp36,900 Rp166,050 0.500
10 Pasir urug M3 0.214 M3 Rp50,000 Rp10,710 0.024
11 Lantai kerja t = 10 cm M2 2.250 M2 Rp57,085 Rp128,440 0.250
12 Pas. Bata 1 PC : 2 PS + plesteran M2 15.000 M2 Rp71,656 Rp1,074,840 1.667
13 Plat beton penutup dan balok M3 0.300 M3 Rp8,591,413 Rp2,577,424 0.033
14 Pipa PVC 4" jenis AW + sambungan M1 5.400 M1 Rp40,000 Rp216,000 0.600
15 Pipa GIP 1 1/2" btg 1.200 btg Rp294,000 Rp352,800 0.133
16 Galian tanah untuk rembesan M3 3.375 M3 Rp36,900 Rp124,538 0.375
17 Pas.ijuk Kg 5.400 Kg Rp7,000 Rp37,800 0.600
18 Urugan kerikil 3,5 cm M3 1.050 M3 Rp36,500 Rp38,325 0.117
19 Pipa PVC 4" berlobang jenis AW M1 9.000 M1 Rp58,750 Rp528,750 1.000
20 Urugan kembali perataan tanah M3 1.125 M3 Rp9,998 Rp11,248 0.125
21 Pompa zetpump 250 watt sanyo bh 1.000 bh Rp4,850,000 Rp4,850,000 0.111
Jumlah Rp21,050,043 Jumlah
Biaya
Upah/Hari
Rp97,705
Rp90,432
Rp16,453
Rp11,023
Rp215,613
Biaya
Bahan/Hari
Rp7,224
Rp19,837
Rp39,175
Rp21,111
Rp610,000
Rp14,667
Rp455,556
Rp47,222
Rp18,450
Rp1,190
Rp14,271
Rp119,427
Rp286,380
Rp24,000
Rp39,200
Rp13,838
Rp4,200
Rp4,258
Rp58,750
Rp1,250
Rp538,889
Rp2,338,894
RAB BAHAN PEKERJAAN INSTALASI AIR DAN SANITASI
Biaya
Bahan/Hari
Rp33,578
Rp171,249
Rp335,781
Rp40,714
Rp784,286
Rp18,857
Rp1,171,429
Rp60,714
Rp23,721
Rp1,530
Rp18,349
Rp153,549
Rp368,203
Rp30,857
Rp50,400
Rp17,791
Rp5,400
Rp5,475
Rp75,536
Rp1,607
Rp692,857
Rp4,061,883
KEBUTUHAN TENAGA KERJA
Koeff. Koeff.
No. Uraian Jenis pekerjaan Sat. Volume Sat
(Awal) (Akhir)
1 2 3 4 5 6 7
XII PEKERJAAN INSTALASI AIR DAN SANITASI
XII.1 Pipa PVC 1''
Tukang batu Oh 0.0600 0.0540 47.000 m'
Kepala tukang batu Oh 0.0060 0.0054 47.000 m'
Pekerja Oh 0.0360 0.0324 47.000 m'
Mandor Oh 0.0018 0.0016 47.000 m'
Jumlah
XII.2 Pipa PVC 3''
Tukang batu Oh 0.0600 0.0540 47.000 m'
Kepala tukang batu Oh 0.0060 0.0054 47.000 m'
Pekerja Oh 0.0360 0.0324 47.000 m'
Mandor Oh 0.0018 0.0016 47.000 m'
Jumlah
XII.3 Pipa PVC 4"
Tukang batu Oh 0.0600 0.0540 60.000 m'
Kepala tukang batu Oh 0.0060 0.0054 60.000 m'
Pekerja Oh 0.0360 0.0324 60.000 m'
Mandor Oh 0.0018 0.0016 60.000 m'
Jumlah
XII.4 Bak
Tukang batu Oh 2.7000 2.4300 3.000 bh
Kepala tukang batu Oh 0.5400 0.4860 3.000 bh
Pekerja Oh 1.8000 1.6200 3.000 bh
Mandor Oh 0.1100 0.0990 3.000 bh
Jumlah
XII.5 Bathtub
Tukang batu Oh 2.7000 2.4300 2.000 bh
Kepala tukang batu Oh 0.5400 0.4860 2.000 bh
Pekerja Oh 1.8000 1.6200 2.000 bh
Mandor Oh 0.1100 0.0990 2.000 bh
Jumlah
XII.6 Keran
Pekerja Oh 0.0400 0.0360 6.000 bh
Mandor Oh 0.0400 0.0360 6.000 bh
Jumlah
XII.7 Kloset Duduk
Tukang batu Oh 1.1000 0.9900 4.000 bh
Kepala tukang batu Oh 0.0100 0.0090 4.000 bh
Pekerja Oh 3.3000 2.9700 4.000 bh
Mandor Oh 0.1600 0.1440 4.000 bh
Jumlah
XII.8 Kitchen zink stainless 2 lobang
Tukang batu Oh 1.1000 0.9900 1.000 bh
Kepala tukang batu Oh 0.0100 0.0090 1.000 bh
Pekerja Oh 3.3000 2.9700 1.000 bh
Mandor Oh 0.1600 0.1440 1.000 bh
Jumlah
XII.9 Septictank
Pekerja Oh 7.078 6.3700 1.000 unit
Tukang batu Oh 3.000 2.7000 1.000 unit
Kepala tukang batu Oh 0.800 0.7200 1.000 unit
Mandor Oh 0.500 0.4500 1.000 unit
Jumlah
XII.10 Pompa Zet Pump
Pekerja Oh 0.2500 0.2250 1.000 unit
Mandor Oh 0.1250 0.1125 1.000 unit
Jumlah
1 2 3 4 5 6 7=5x4
XII PEKERJAAN INSTALASI AIR DAN SANITASI
XII.1 Pipa PVC 1''
Pipa PVC maspion abu diameter 1" (AW) bt 0.1667 47.00 m' 7.835
XII.4 Bak
Bak fiberglass bh 1.0000 3.00 bh 3.000
XII.5 Bathtub
Bathtube standard bh 1.0000 2.00 bh 2.000
XII.6 Keran
Kran stainless lokal kait bh 1.0000 6.00 bh 6.000
XII.9 Septictank
Galian tanah M3 4.5000 1.00 unit 4.500
Pasir urug M3 0.2142 1.00 unit 0.214
Lantai kerja t = 10 cm M2 2.2500 1.00 unit 2.250
Pas. Bata 1 PC : 2 PS + plesteran M2 15.0000 1.00 unit 15.000
Plat beton penutup dan balok M3 0.3000 1.00 unit 0.300
Pipa PVC 4" jenis AW + sambungan M1 5.4000 1.00 unit 5.400
Pipa GIP 1 1/2" btg 1.2000 1.00 unit 1.200
Galian tanah untuk rembesan M3 3.3750 1.00 unit 3.375
Pas.ijuk Kg 5.4000 1.00 unit 5.400
Urugan kerikil 3,5 cm M3 1.0500 1.00 unit 1.050
Pipa PVC 4" berlobang jenis AW M1 9.0000 1.00 unit 9.000
Urugan kembali perataan tanah M3 1.1250 1.00 unit 1.125
7 8 9 10 11 12 13 14
1.269
0.127
47 m' 0.761 23.500 m'
0.038
1.269
0.127
47 m' 0.761 23.500 m'
0.038
1.620
0.162
60 m' 30.000 m'
0.972
0.049
3.645
0.729
3 bh 2.430 1.500 bh
0.149
1.620
0.324
2 bh 1.080 0.667 bh
0.066
0.216
6 bh 0.216 6.000 bh
1.980
0.018
4.000 bh 5.940 2.000 bh
0.288
4.000 bh 2.000 bh
0.990
0.009
1 bh 2.970 1.000 bh
0.144
3.185
1.350
1.000 unit 0.500 unit
0.360
0.225
0.225
1.000 unit 0.113 1.000 unit