Anda di halaman 1dari 7

Analisa Harga Satuan Pekerjaan Sanitasi

Diposkan : 04 Juni 2014


Oleh : Endang Kusman

No.
M01

URAIAN

HARGA
(Rp)

bh
Kg
m3
org
org
org
org

1.00
6.00
0.01
1.0000
1.5000
1.5000
0.1600

188,200.00
1,406.00
233,400.00
42,000.00
65,000.00
75,000.00
80,000.00

188,200.00
8,436.00
2,334.00
42,000.00
97,500.00
112,500.00
12,800.00
463,770.00
463,770.00

bh
Kg
m3
org
org
org
org
lot

1.00 1,773,400.00
6.00
1,406.00
0.01 233,400.00
1.0000
42,000.00
1.0000
65,000.00
0.1000
75,000.00
0.0010
80,000.00
0.3000 1,773,400.00

1,773,400.00
8,436.00
2,334.00
42,000.00
65,000.00
7,500.00
80.00
532,020.00
2,430,770.00
2,430,770.00

unit
Kg
m3
org
org
org
org
lot

1.00 1,012,700.00
6.00
1,406.00
0.01 233,400.00
1.2000
42,000.00
1.4500
65,000.00
0.1500
75,000.00
0.1000
80,000.00
0.1200 1,773,400.00

1,012,700.00
8,436.00
2,334.00
50,400.00
94,250.00
11,250.00
8,000.00
212,808.00
1,400,178.00

1 Buah Urinoir
Urinoir
P.C (50 gk)
Pasir pasang
Pekerja
Tukang batu
Kepala Tukang
Mandor
Perlengkapan 30 % harga urinoir
Jumlah
Dibulatkan

M03

VOLUM
HARGA SAT
E
(Rp)

1 Buah Closet jongkok Porselen Standar


Closet jongkok
P.C (50 gk)
Pasir pasang
Pekerja
Tukang batu
Kepala Tukang
Mandor
Jumlah
Dibulatkan

M02

SAT

1 Buah Wastafel
wastafel standar
P.C (50 gk)
Pasir pasang
Pekerja
Tukang batu
Kepala Tukang
Mandor
Perlengkapan 12 % harga wastafel
Jumlah

Dibulatkan
M04

1 Buah bak Mandi Fibreglass Volume 0,30 m3


Bak fibreglass 0.60m x 0.60m
Pekerja
Tukang batu
Kepala Tukang
Mandor
Perlengkapan 18 % harga bak
Jumlah
Dibulatkan

M05

1.00
1.8000
2.7000
0.5400
0.1100
0.1800

255,300.00
42,000.00
65,000.00
75,000.00
80,000.00
255,300.00

255,300.00
75,600.00
175,500.00
40,500.00
8,800.00
45,954.00
601,654.00
601,654.00

bh
bh
Kg
m3
m3
org
org
org
org

1.10
25.00
10.300
0.061
0.069
0.3800
0.1900
0.0190
0.0190

61,700.00
775.00
1,406.00
233,400.00
175,300.00
42,000.00
65,000.00
75,000.00
80,000.00

67,870.00
19,375.00
14,481.80
14,237.40
12,095.70
15,960.00
12,350.00
1,425.00
1,520.00
159,314.90
159,315.00

775.00
1,406.00
233,400.00
211,100.00
16,500.00
255,400.00
42,000.00
65,000.00
75,000.00
80,000.00
42,000.00

144,150.00
160,284.00
42,945.60
6,966.30
80,025.00
30,648.00
90,720.00
46,800.00
5,400.00
8,640.00
4,200.00
620,778.90
620,779.00

775.00

41,075.00

1 Buah Bak Kontrol Pas Bata Merah Uk (60 x 60) cm


Bata merah
P.C (50 gk)
Pasir pasang
Batu pecah 2/3
Besi beton
Pasir beton
Pekerja
Tukang batu
Kepala Tukang
Mandor
Tukang gali
Jumlah
Dibulatkan

M07

bh
org
org
org
org
lot

1 M' Saluran Air Limbah Buis beton d = 30 cm - 60 cm


Buis beton 30 cm
Bata merah
P.C (50 gk)
Pasir pasang
Pasir urug
Pekerja
Tukang batu
Kepala Tukang
Mandor
Jumlah
Dibulatkan

M06

1,400,178.00

bh
Kg
m3
m3
m3
m3
org
org
org
org
org

186.00
114.000
0.184
0.033
4.850
0.120
2.1600
0.7200
0.0720
0.1080
0.1000

1 Buah Bak Kontrol Pas Bata Merah Uk (30 x 30) cm


Bata merah

bh

53.00

P.C (50 gk)


Pasir pasang
Batu pecah 2/3
Besi beton
Pasir beton
Pekerja
Tukang batu
Kepala Tukang
Mandor
Jumlah
Dibulatkan
M08

1,406.00
233,400.00
211,100.00
16,500.00
255,400.00
42,000.00
65,000.00
75,000.00
80,000.00

61,864.00
16,338.00
14,777.00
26,400.00
15,324.00
134,400.00
65,975.00
112.50
1,280.00
377,545.50
377,546.00

m'
org
org
org
org
lot

1.2000
0.0360
0.0600
0.0060
0.0018
0.3500

10,025.00
42,000.00
65,000.00
75,000.00
80,000.00
12,030.00

12,030.00
1,512.00
3,900.00
450.00
144.00
4,210.50
22,246.50
22,247.00

m'
org
org
org
org
lot

1.2000
0.0360
0.0600
0.0060
0.0018
0.3500

15,800.00
42,000.00
65,000.00
75,000.00
80,000.00
18,960.00

18,960.00
1,512.00
3,900.00
450.00
144.00
6,636.00
31,602.00
31,602.00

m'
org
org
org
org
lot

1.2000
0.0360
0.0600
0.0060
0.0018
0.3500

26,475.00
42,000.00
65,000.00
75,000.00
80,000.00
31,770.00

31,770.00
1,512.00
3,900.00
450.00
144.00
11,119.50
48,895.50
48,896.00

1 M' Pipa PVC 1" (AW)


Pipa pvc 1"
Pekerja
Tukang batu
Kepala Tukang
Mandor
Perlengkapan 35 % harga pipa
Jumlah
Dibulatkan

M10

44.000
0.070
0.070
1.600
0.060
3.2000
1.0150
0.0015
0.0160

1 M' Pipa PVC 1/2" (AW)


Pipa pvc 1/2"
Pekerja
Tukang batu
Kepala Tukang
Mandor
Perlengkapan 35 % harga pipa
Jumlah
Dibulatkan

M09

Kg
m3
m3
m3
m3
org
org
org
org

1 M' Pipa PVC 11/2" (AW)


Pipa pvc 11/2"
Pekerja
Tukang batu
Kepala Tukang
Mandor
Perlengkapan 35 % harga pipa
Jumlah
Dibulatkan

M11

1 M' Pipa PVC 2" (AW)


Pipa pvc 2"
Pekerja
Tukang batu
Kepala Tukang
Mandor
Perlengkapan 35 % harga pipa
Jumlah
Dibulatkan

M12

33,210.00
1,512.00
3,900.00
450.00
144.00
11,119.50
50,335.50
50,336.00

m'
org
org
org
org
lot

1.2000
0.0810
0.1350
0.0135
0.0041
0.3500

86,975.00
42,000.00
65,000.00
75,000.00
80,000.00
104,370.00

104,370.00
3,402.00
8,775.00
1,012.50
328.00
36,529.50
154,417.00
154,417.00

m'
org
org
org
org
lot

1.2000
0.0810
0.1350
0.0135
0.0041
0.3500

13,050.00
42,000.00
65,000.00
75,000.00
80,000.00
15,660.00

15,660.00
3,402.00
8,775.00
1,012.50
328.00
5,481.00
34,658.50
34,659.00

bh

1.0000

397,800.00

397,800.00

org
org
org
org

0.0300
0.3000
0.0300
0.0015

42,000.00
65,000.00
75,000.00
80,000.00

1,260.00
19,500.00
2,250.00
120.00
420,930.00
420,930.00

1 Buah Bak Cuci piring Stainless steel


Bak cuci stainless steel + asesoris
lengkap
Pekerja
Tukang batu
Kepala Tukang
Mandor
Jumlah
Dibulatkan

M15

27,675.00
42,000.00
65,000.00
75,000.00
80,000.00
31,770.00

1 M' Pipa PVC 3/4" (AW)


Pipa pvc 3/4"
Pekerja
Tukang batu
Kepala Tukang
Mandor
Perlengkapan 35 % harga pipa
Jumlah
Dibulatkan

M14

1.2000
0.0360
0.0600
0.0060
0.0018
0.3500

1 M' Pipa PVC 4" (AW)


Pipa pvc 4"
Pekerja
Tukang batu
Kepala Tukang
Mandor
Perlengkapan 35 % harga pipa
Jumlah
Dibulatkan

M13

m'
org
org
org
org
lot

1 Buah Kran 1/2" - 3/4"

Kran air
Seal tape
Pekerja
Tukang batu
Kepala Tukang
Mandor
Jumlah
Dibulatkan
M16

40,900.00
105.00
420.00
6,500.00
750.00
400.00
49,075.00
49,075.00

bh
org
org
org
org

1.0000
0.0100
0.1000
0.0100
0.0050

66,600.00
42,000.00
65,000.00
75,000.00
80,000.00

66,600.00
420.00
6,500.00
750.00
400.00
74,670.00
74,670.00

bh
bh
zak
m3
m3
org
org
org
org

1.1000
12.0000
0.1030
0.0305
0.0345
0.0100
0.1000
0.0100
0.0050

44,300.00
775.00
1,406.00
233,400.00
175,300.00
42,000.00
65,000.00
75,000.00
80,000.00

48,730.00
9,300.00
144.82
7,118.70
6,047.85
420.00
6,500.00
750.00
400.00
79,411.37
79,411.00

60,000.00
63,000.00
42,000.00
65,000.00
75,000.00
80,000.00

63,000.00
22,050.00
6,300.00
26,000.00
1,875.00
100.00
119,325.00
119,325.00

1 M' Pasang Talang Plastik PVC U 15 cm (AW)


Talang plastik PVC
Perlengkapan 35 % harga talang
Pekerja
Tukang batu
Kepala Tukang
Mandor
Jumlah
Dibulatkan

M19

40,900.00
4,200.00
42,000.00
65,000.00
75,000.00
80,000.00

1 M' Grafel beton U 20 cm -60 cm


Pipa beton U
Bata merah
P.C (50 gk)
Pasir pasang
Pasir urug
Pekerja
Tukang batu
Kepala Tukang
Mandor
Jumlah
Dibulatkan

M18

1.0000
0.0250
0.0100
0.1000
0.0100
0.0050

1 Buah Floor Drain


Floor drain
Pekerja
Tukang batu
Kepala Tukang
Mandor
Jumlah
Dibulatkan

M17

bh
bh
org
org
org
org

m'
lot
org
org
org
org

1 M' Saluran Air Limbah Buis Beton 60 cm

1.05000
0.3500
0.1500
0.4000
0.0250
0.0013

Buis beton 60 cm
Bata merah
P.C (50 gk)
Pasir pasang
Pasir urug
Pekerja
Tukang batu
Kepala Tukang
Mandor
Jumlah
Dibulatkan
M20

130,900.00
775.00
1,406.00
233,400.00
175,300.00
42,000.00
65,000.00
75,000.00
80,000.00

143,990.00
19,375.00
289.64
14,237.40
12,095.70
15,960.00
12,350.00
1,425.00
1,520.00
221,242.74
221,243.00

lbr
kg
m3
kg
org
org
org
org

0.50000
20,801.00
0.01500
23,400.00
0.00960 2,850,000.00
0.2500
30,400.00
0.1500
42,000.00
0.4000
65,000.00
0.0250
75,000.00
0.0013
80,000.00

10,400.50
351.00
27,360.00
7,600.00
6,300.00
26,000.00
1,875.00
100.00
79,986.50
79,987.00

bh
org
org
org
org
lot

1.00 1,724,700.00
3.3000
42,000.00
1.1000
65,000.00
0.0010
75,000.00
0.1600
80,000.00
0.0600 1,724,700.00

1,724,700.00
138,600.00
71,500.00
75.00
12,800.00
103,482.00
2,051,157.00
2,051,157.00

1.00 1,316,400.00
3.3000
42,000.00
1.1000
65,000.00
0.0010
75,000.00
0.1600
80,000.00
0.0600 1,316,400.00

1,316,400.00
138,600.00
71,500.00
75.00
12,800.00
78,984.00

1 Buah Closet Duduk


Closet duduk
Pekerja
Tukang batu
Kepala Tukang
Mandor
Perlengkapan 6 % harga closet
Jumlah
Dibulatkan

M22

1.10
25.00
0.206
0.061
0.069
0.3800
0.1900
0.0190
0.0190

1 M' Pasang Talang Seng Datar


Seng pelat 3" x 6"
Paku
Kayu kelas II
Meni besi
Pekerja
Tukang batu
Kepala Tukang
Mandor
Jumlah
Dibulatkan

M21

bh
bh
zak
m3
m3
org
org
org
org

1 Buah Tangki Air fibreglass Volume 1 m3


Bak fibreglass kapasitas 1 m3
Pekerja
Tukang batu
Kepala Tukang
Mandor
Perlengkapan 6 % harga bak

bh
org
org
org
org
lot

Jumlah
Dibulatkan
M23

1 Unit Septictank 2x1,50x1,50 m + Rembesan


Galian tanah
Pasir urug
lantai kerja
Pas bata adk 1pc : 3ps
Pelat beton K-225
Plesteran adk 1pc : 3ps
Pipa PVC 4" jenis AW
Pipa GIP 1 1/2"
Galian tanah untuk rembesan
Pas ijuk
Urugan kerikil 3/5
Pipa PVC 4" berlubang jenis AW
Urugan dan perataan tanah
Jumlah
Dibulatkan

M24

1,618,359.00
1,618,359.00

m3
m3
m3
m2
m3
m2
m'
m'
m3
kg
m3
m'
m3

4.500
26,252.00
0.214 175,300.00
2.250 716,798.00
15.000 220,267.10
0.300 6,438,864.00
15.000
41,301.82
5.400 256,800.00
5.000
46,750.00
3.375
20,000.00
5.400
23,400.00
1.050 205,000.00
9.000
36,700.00
1.125
34,584.00

118,134.00
37,514.20
1,612,795.50
3,304,006.50
1,931,659.20
619,527.30
1,386,720.00
233,750.00
67,500.00
126,360.00
215,250.00
330,300.00
38,907.00
10,022,423.70
10,022,424.00

2.250
20,000.00
0.107 175,300.00
1.125 716,798.00
7.500 220,267.10
0.150 6,438,864.00
7.500
41,301.82
9.000 256,800.00
2.500
46,750.00
1.688
20,000.00
2.700
23,400.00
0.525 205,000.00
9.000
36,700.00
0.563
34,584.00

45,000.00
18,757.10
806,397.75
1,652,003.25
965,829.60
309,763.65
2,311,200.00
116,875.00
33,760.00
63,180.00
107,625.00
330,300.00
19,470.79
6,780,162.14
6,780,162.00

1 Unit Septictank 1x1,50x1,50 m + Rembesan


Galian tanah
Pasir urug
lantai kerja
Pas bata adk 1pc : 3ps
Pelat beton K-225
Plesteran adk 1pc : 3ps
Pipa PVC 4" jenis AW
Pipa GIP 1 1/2"
Galian tanah untuk rembesan
Pas ijuk
Urugan kerikil 3/5
Pipa PVC 4" berlubang jenis AW
Urugan dan perataan tanah
Jumlah
Dibulatkan

Kembali ke Analisa SNI

m3
m3
m3
m2
m3
m2
m'
m'
m3
kg
m3
m'
m3

Anda mungkin juga menyukai