TYPE FOOTPLAT JUMLAH FOOTPLAT DIMENSI VOLUME BETON BESI Kg/m³ BEKISTING m²/m³
F1 28 150 X 150 25.200 m³ 56.42 Kg/m³ 2.67 m²/m³
F2 11 200 X 200 17.600 m³ 39.44 Kg/m³ 2.00 m²/m³
JUMLAH 39
PONDASI FOOTPLAT
NAMA DIMENSI n Volum
Beton Bekisting Besi
P (P-) L (L-) T Jenis Tul Ø Type jarak n Length
L a b c d
40 D 20 D 15 D 6D
F1 1.50 0.05 1.50 0.05 0.40 28 25.20 67.20 TP atas 13 D 4 1.95 0.08
150 X 150 TP bawah 13 D 0.150 11 1.40 0.08
ts atas 13 D 4 1.95 0.08
Luas pn d13 0.0001327 ts Bawah 13 D 0.150 11 1.40 0.08
F2 2.00 0.05 2.00 0.05 0.40 11 17.60 35.20 TP atas 13 D 4 1.95 0.08
200 X 200 TP bawah 13 D 0.150 15 1.40 0.08
ts atas 13 D 4 1.95 0.08
Luas pn d13 0.0001327 ts Bawah 13 D 0.150 15 1.40 0.08
KOLOM LANTAI 1
TYPE KOLOM JUMLAH KOLOM DIMENSI VOLUME BETON BESI Kg/m³ BEKISTING m²/m³
KOLOM LANTAI 1
NAMA DIMENSI n Volum
Beton Bekisting Besi
SLOOF
NAMA DIMENSI n Volum
Beton Bekisting Besi
P (H) (H-) (B) (B-) Jenis Tul Ø Type jarak n Length
L a b c d
40 D 20 D 15 D 6D
BS1 1.0 0.40 0.03 0.25 0.03 1 0.084 0.80 TA tump T. 16 D 5 0.25 0.24
25 X 40 1 TA tump Te. 16 D 4 0.25 0.24
1 TA lap 16 D 4 0.50 0.24
1 TB tump T. 16 D 5 0.25 0.24
1 TB tump Te. 16 D 4 0.25 0.24
Luas pn d16 0.000201 1 TB lap 16 D 4 0.50 0.24
Luas pn Ø10 0.0000785 1 ts tump 10 Ø 0.100 6 1.18 0.06
1 ts lap 10 Ø 0.200 4 1.18 0.06
BS2 1.0 0.40 0.03 0.25 0.03 1 0.096 0.80 TA tump 16 D 4 0.50
25 X 40 1 TA lap 16 D 4 0.50
1 TB tump 16 D 4 0.50
Luas pn d16 0.000201 1 TB lap 16 D 4 0.50
Luas pn Ø10 7.85E-05 1 ts tump 10 Ø 0.100 6 1.18 0.06
1 ts lap 10 Ø 0.200 4 1.18 0.06
BS3 1.0 0.40 0.03 0.25 0.03 1 0.091 0.80 TA tump 16 D 5 0.50 0.24
25 X 40 1 TA lap 16 D 4 0.50 0.24
1 TB tump 16 D 5 0.50 0.24
Luas pn d16 0.000201 1 TB lap 16 D 4 0.50 0.24
Luas pn Ø10 0.0000785 1 ts tump 10 Ø 0.100 6 1.18 0.06
1 ts lap 10 Ø 0.200 4 1.18 0.06
BSP 1.0 0.23 0.03 0.15 0.03 1 0.031 0.46 TA tump 12 D 2 0.50
15 X 25 1 TA lap 12 D 2 0.50
1 TB tump 12 D 2 0.50
Luas pn Ø12 0.000113 1 TB lap 12 D 2 0.50
Luas pn Ø10 0.0000785 1 ts tump 10 Ø 0.100 6 0.64 0.06
1 ts lap 10 Ø 0.200 4 0.64 0.06
KOLOM LANTAI 2
TYPE KOLOM JUMLAH KOLOM DIMENSI VOLUME BETON BESI Kg/m³ BEKISTING m²/m³
KOLOM LANTAI 2
NAMA DIMENSI n Volum
Beton Bekisting Besi
BALOK LANTAI 2
NAMA DIMENSI n Volum
Beton Bekisting
Besi
B (30 X 40) 1.0 0.4 0.03 0.3 0.03 1 0.112 1.10 TA tump 16 D 5 0.50 0.24
30 X 40 1 TA lap 16 D 4 0.50 0.24
1 TB tump 16 D 5 0.50 0.24
Luas pn d16 0.000201 1 TB lap 16 D 4 0.50 0.24
Luas pn Ø10 0.0000785 1 ts tump 10 Ø 0.100 6 1.28 0.06
1 ts lap 10 Ø 0.200 4 1.28 0.06
B (25 X 40) 1.0 0.4 0.03 0.25 0.03 1 0.097 1.05 TA tump 16 D 3 0.50
25 X 40 1 TA lap 16 D 3 0.50
1 TB tump 16 D 3 0.50
Luas pn d16 0.00020 1 TB lap 16 D 3 0.50
Luas pn Ø10 0.0000785 1 ts tump 10 Ø 0.150 5 1.18 0.06
1 ts lap 10 Ø 0.200 4 1.18 0.06
B (15 X 25) 1.0 0.25 0.03 0.15 0.03 1 0.036 0.65 TA tump 13 D 2 0.50
15 X 25 1 TA lap 13 D 2 0.50
1 TB tump 13 D 2 0.50
Luas pn d13 0.0001327 1 TB lap 13 D 2 0.50
Luas pn Ø10 0.0000785 1 ts tump 10 Ø 0.150 5 0.68 0.06
1 ts lap 10 Ø 0.200 4 0.68 0.06
KOLOM LANTAI 3
TYPE KOLOM JUMLAH KOLOM DIMENSI VOLUME BETON BESI Kg/m³ BEKISTING m²/m³
KOLOM LANTAI 3
NAMA DIMENSI n Volum
Beton Bekisting
Besi
B (30 X 50) 1.0 0.50 0.03 0.30 0.03 1 0.144 1.30 TA tump 16 D 5 0.50 0.24
30 X 50 1 TA lap 16 D 3 0.50 0.24
0.15 1 TB tump 16 D 3 0.50 0.24
Luas pn d16 0.000201 1 TB lap 16 D 4 0.50 0.24
Luas pn Ø10 7.85E-05 1 TS 10 Ø 2 1.00 0.15
1 ts tump 10 Ø 0.100 6 1.48 0.06
1 ts lap 10 Ø 0.200 4 1.48 0.06
B (30 X 40) 1.0 0.4 0.03 0.3 0.03 1 0.112 1.10 TA tump 16 D 5 0.50 0.24
30 X 40 1 TA lap 16 D 4 0.50 0.24
1 TB tump 16 D 5 0.50 0.24
Luas pn d16 0.000201 1 TB lap 16 D 4 0.50 0.24
Luas pn Ø10 0.0000785 1 ts tump 10 Ø 0.100 6 1.28 0.06
1 ts lap 10 Ø 0.200 4 1.28 0.06
B (25 X 40) 1.0 0.4 0.03 0.25 0.03 1 0.097 1.05 TA tump 16 D 3 0.50
25 X 40 1 TA lap 16 D 3 0.50
1 TB tump 16 D 3 0.50
Luas pn d16 0.000201 1 TB lap 16 D 3 0.50
Luas pn Ø10 0.0000785 1 ts tump 10 Ø 0.150 5 1.18 0.06
1 ts lap 10 Ø 0.200 4 1.18 0.06
B (15 X 25) 1.0 0.25 0.03 0.15 0.03 1 0.036 0.50 TA tump 13 D 2 0.50
15 X 25 1 TA lap 13 D 2 0.50
1 TB tump 13 D 2 0.50
Luas pn d13 0.0001327 1 TB lap 13 D 2 0.50
Luas pn Ø10 0.0000785 1 ts tump 10 Ø 0.150 5 0.68 0.06
1 ts lap 10 Ø 0.200 4 0.68 0.06
RINK BALK
NAMA DIMENSI n Volum
Beton Bekisting
Besi
RB.P ( 15 X 25 ) 1.0 0.25 0.03 0.15 0.03 1 0.036 0.50 TA tump 12 D 2 0.50
15 X 25 1 TA lap 12 D 2 0.50
1 TB tump 12 D 2 0.50
Luas pn Ø12 0.000113 1 TB lap 12 D 2 0.50
Luas pn Ø10 0.0000785 1 ts tump 10 Ø 0.100 6 0.68 0.06
1 ts lap 10 Ø 0.200 4 0.68 0.06
BALOK TANDON
NAMA DIMENSI n Volum
Beton Bekisting
Besi
KOLOM PEDISTAL
TYPE KOLOM JUMLAH KOLOM DIMENSI VOLUME BETON BESI Kg/m³ BEKISTING m²/m³
KOLOM PEDISTAL
NAMA DIMENSI n Volum
tot Total
Berat/m' Berat Besi Bekisting
panjang berat
PONDASI FOOTPLAT
Rasio
tot Total
Berat/m' Berat Besi Bekisting
panjang berat
KOLOM LANTAI 1
Rasio
tot Total
Berat/m' Berat Besi Bekisting
panjang berat
SLOOF
Rasio
tot Total
Berat/m' Berat Besi Bekisting
panjang berat
KOLOM LANTAI 2
Rasio
tot Total
Berat/m' Berat Besi Bekisting
panjang berat
0.74 1.578 5.84 20.10 98.34 8.32
0.74 1.578 3.50 11.96 58.50
0.74 1.578 4.67
0.74 1.578 4.67
1.15 0.617 1.42
1.94 0.617 7.18
1.94 0.617 4.78
0.74 1.578 5.84 18.94 131.14 9.00
0.74 1.578 3.50 9.49 65.75
0.74 1.578 3.50
0.74 1.578 4.67
1.15 0.617 1.42
1.54 0.617 5.70
1.54 0.617 3.80
Rasio
tot Total
Berat/m' Berat Besi Bekisting
panjang berat
KOLOM LANTAI 3
Rasio
tot Total
Berat/m' Berat Besi Bekisting
panjang berat
BALOK LANTAI 3
Rasio
tot Total
Berat/m' Berat Besi Bekisting
panjang berat
RINK BALK
Rasio
tot Total
Berat/m' Berat Besi Bekisting
panjang berat
BALOK TANDON
Rasio
tot Total
Berat/m' Berat Besi Bekisting
panjang berat
KOLOM PEDISTAL
PONDASI FOOTPLAT
VOLUME
TYPE FOOTPLAT JUMLAH FOOTPLAT DIMENSI BESI Kg BEKISTING m²
BETON
P1 3 150 X 150 2.70 m³ 171.69 Kg 7.20 m²
P2 8 200 X 200 12.80 m³ 579.94 Kg 25.60 m²
P3 8 150 X 150 7.20 m³ 215.58 Kg 19.20 m²
JUMLAH 19
P2 2.00 0.05 2.00 0.05 0.40 8 12.80 25.60 Tax 13 D 4 1.95 0.16
200 X 200 Tay 13 D 4 1.40 0.16
Tbx 13 D 0.150 15 1.95 0.16
Luas pn d13 0.000133 Tby 13 D 0.150 15 1.40 0.16
P3 1.50 0.05 1.50 0.05 0.40 8 7.20 19.20 Tax 13 D 4 1.95 0.16
150 X 150 Tay 13 D 4 1.40 0.16
Tbx 13 D 0.150 11 1.95 0.16
Luas pn d13 0.000133 Tby 13 D 0.150 11 1.40 0.16
Rasio
tot Total
Berat/m' Berat Besi Bekisting
panjang berat
PONDASI FOOTPLAT
KOLOM PEDISTAL
TYPE KOLOM JUMLAH KOLOM DIMENSI VOLUME BESI Kg BEKISTING m²
BETON
K. PEDISTAL K1 15 40 X 40 6.961 m³ 1306.2 Kg 69.60 m²
K. PEDISTAL KP 19 15 X 15 1.247 m³ 569.5 Kg 33.06 m²
JUMLAH 34
KOLOM PEDISTAL
NAMA DIMENSI n Volum
tot
P (P-) L (L-) T Jenis Tul Ø Type jarak n
Length panjang
L a b c d
40 D 20 D 15 D 6D
K. PEDISTAL K1 0.40 0.03 0.40 0.030 2.90 15 6.961 69.60 TP 16 D 12 3.40 3.40
40 X 40 15 ts tump 10 Ø 0.100 15 1.48 0.12 1.60
Luas pn d16 0.00020 15 ts lap 10 Ø 0.200 8 1.48 0.12 1.60
Luas pn Ø10 0.000079
K. PEDISTAL KP 0.15 0.03 0.15 0.030 2.90 19 1.247 33.06 TP 16 D 4 3.40 3.40
15 X 15 19 ts tump 10 Ø 0.100 15 0.48 0.12 0.60
Luas pn d16 0.00020 19 ts lap 10 Ø 0.200 8 0.48 0.12 0.60
Luas pn Ø10 0.000079
KOLOM LANTAI 1
VOLUME
TYPE KOLOM JUMLAH KOLOM DIMENSI BESI Kg BEKISTING m²
BETON
K1 15 40 X 40 8.380 m³ 1543.22 Kg 84.00 m²
KP 19 15 X 15 1.521 m³ 463.15 Kg 39.90 m²
KP (PAGAR) 30 15 X 15 2.368 m³ 725.97 Kg 62.10 m²
JUMLAH 64
KOLOM LANTAI 1
NAMA DIMENSI n Volum
Beton Bekisting Besi
tot
P (P-) L (L-) T Jenis Tul Ø Type jarak n
Length panjang
L a b c d
40 D 20 D 15 D 6D
KP (PAGAR) 0.15 0.03 0.15 0.030 3.45 30 2.368 62.10 TP 12 Ø 4 3.95 3.95
15 X 15 30 ts tump 10 Ø 0.100 18 0.48 0.12 0.60
Luas pn Ø12 0.000113 30 ts lap 10 Ø 0.200 10 0.48 0.12 0.60
Luas pn Ø10 0.000079
KOLOM LANTAI 2
TYPE KOLOM JUMLAH KOLOM DIMENSI VOLUME BESI Kg BEKISTING m²
BETON
K1 15 40 X 40 9.562 m³ 1737.05 Kg 96.00 m²
KP 21 15 X 15 1.913 m³ 576.38 Kg 50.40 m²
JUMLAH 36
KOLOM LANTAI 2
NAMA DIMENSI n Volum
Beton Bekisting Besi
tot
P (P-) L (L-) T Ø Type jarak n Length panjang
L a b c d
Jenis Tul
40 D 20 D 15 D 6D
KOLOM LANTAI 3
VOLUME
TYPE KOLOM JUMLAH KOLOM DIMENSI BESI Kg BEKISTING m²
BETON
K1 15 40 X 40 8.371 m³ 1556.37 Kg 84.00 m²
KP 14 15 X 15 1.116 m³ 332.00 Kg 29.40 m²
JUMLAH 29
KOLOM LANTAI 3
NAMA DIMENSI n Volum
L a b c d
40 D 20 D 15 D 6D
Total
Berat/m' Berat Besi Bekisting
berat
KOLOM PEDISTAL
Rasio
Total
Berat/m' Berat Besi Bekisting
berat
KOLOM LANTAI 1
Rasio
Total
Berat/m' Berat Besi Bekisting
berat
KOLOM LANTAI 2
Rasio
Total
Berat/m' Berat Besi Bekisting
berat
KOLOM LANTAI 3
SLOOF
TYPE BALOK PANJANG BALOK DIMENSI VOLUME BETON BESI Kg BEKISTING m²
BS1 90.56 25 X 40 6.93 m³ 1366.6 Kg/m³ 72.45 m²
BSP 113.31 15 X 25 4.151 m³ 824.35 Kg/m³ 56.66 m²
JUMLAH 91
SLOOF
NAMA DIMENSI n Volum
Beton Bekisting Besi
P (H) (H-) (B) (B-) Jenis Tul Ø Type jarak n Length
L a b c d
40 D 20 D 15 D 6D
BS1 90.6 0.4 0.03 0.2 0.03 1 6.934 72.45 TA tump 16 D 3 45.28 0.24
25 X 40 1 TA lap 16 D 3 45.28 0.24
1 TB tump 16 D 3 45.28 0.24
Luas pn d16 0.00020096 1 TB lap 16 D 3 45.28 0.24
Luas pn Ø10 0.0000785 1 ts tump 10 Ø 0.100 454 1.08 0.12
1 ts lap 10 Ø 0.200 228 1.08 0.12
BSP 113.3 0.25 0.03 0.15 0.03 1 4.151 56.66 TA tump 12 D 2 56.66 0.18
15 X 25 1 TA lap 12 D 2 56.66 0.18
1 TB tump 12 D 2 56.66 0.18
Luas pn d12 0.00011304 1 TB lap 12 D 2 56.66 0.18
Luas pn Ø10 0.0000785 1 ts tump 10 Ø 0.100 568 0.68 0.12
1 ts lap 10 Ø 0.200 285 0.68 0.12
BALOK LANTAI 2 ELEVASI + 3.50
TYPE BALOK PANJANG BALOK DIMENSI VOLUME BETON BESI Kg BEKISTING m²
B (25 X 55) 32.55 25 X 55 4.29 m³ 689.11 Kg 43.94 m²
B (25 X 50) 98.60 25 X 50 11.8 m³ 1902.5 Kg 123.25 m²
B (20 X 40) 52.90 20 X 40 2.40 m³ 490.96 Kg 32.55 m²
JUMLAH 184
BALOK LANTAI 2
NAMA DIMENSI n Volum
Beton Bekisting
Besi
B (25 X 50) 98.6 0.50 0.03 0.25 0.03 1 11.808 123.25 TA tump 16 D 4 49.30 0.24
25 X 50 1 TA lap 16 D 3 49.30 0.24
12.325 1 TB tump 16 D 3 49.30 0.24
Luas pn d16 0.000201 1 TB lap 16 D 4 49.30 0.24
Luas pn Ø10 7.85E-05 1 TS 10 Ø 2 98.60 0.12
1 ts tump 10 Ø 0.100 494 1.38 0.12
1 ts lap 10 Ø 0.200 248 1.38 0.12
B (20 X 40) 32.6 0.4 0.03 0.2 0.03 1 2.396 32.55 TA tump 16 D 3 16.28
20 X 40 1 TA lap 16 D 3 16.28
1 TB tump 16 D 3 16.28
Luas pn d16 0.00020096 1 TB lap 16 D 3 16.28
Luas pn Ø10 0.0000785 1 ts tump 10 Ø 0.100 164 1.08 0.12
1 ts lap 10 Ø 0.200 83 1.08 0.12
BALOK LANTAI 3 ELEVASI + 7.50
TYPE BALOK PANJANG BALOK DIMENSI VOLUME BETON BESI Kg BEKISTING m²
B (25 X 55) 32.55 25 X 55 4.29 m³ 689.11 Kg 43.94 m²
B (25 X 50) 61.50 25 X 50 7.365 m³ 1189.8 Kg 76.88 m²
B (20 X 40) 30.90 20 X 40 2.396 m³ 490.96 Kg 32.55 m²
RB (20 X 40) 18.30 20 X 40 1.377 m³ 253.93 Kg 18.30 m²
RB (15 X 30) 4.35 15 X 20 0.154 m³ 31.94 Kg 2.83 m²
JUMLAH 148
BALOK LANTAI 3
NAMA DIMENSI n Volum
Beton Bekisting
Besi
B (25 X 50) 61.5 0.50 0.03 0.25 0.03 1 7.365 76.88 TA tump 16 D 4 30.75 0.24
25 X 50 1 TA lap 16 D 3 30.75 0.24
1 TB tump 16 D 3 30.75 0.24
Luas pn d16 0.000201 1 TB lap 16 D 4 30.75 0.24
Luas pn Ø10 7.85E-05 1 TS 10 Ø 2 61.50 0.12
1 ts tump 10 Ø 0.100 309 1.38 0.12
1 ts lap 10 Ø 0.200 155 1.38 0.12
B (20 X 40) 32.6 0.4 0.03 0.2 0.03 1 2.396 32.55 TA tump 16 D 3 16.28
20 X 40 1 TA lap 16 D 3 16.28
1 TB tump 16 D 3 16.28
Luas pn d16 0.00020096 1 TB lap 16 D 3 16.28
Luas pn Ø10 0.0000785 1 ts tump 10 Ø 0.100 164 1.08 0.12
1 ts lap 10 Ø 0.200 83 1.08 0.12
RB (20 X 40) 18.3 0.4 0.03 0.2 0.03 1 1.377 18.30 TA tump 16 D 3 9.15
20 X 40 1 TA lap 16 D 3 9.15
1 TB tump 16 D 3 9.15
Luas pn d16 0.00020 1 TB lap 16 D 3 9.15
Luas pn Ø10 0.0000785 1 ts tump 10 Ø 0.150 62 1.08 0.12
1 ts lap 10 Ø 0.200 47 1.08 0.12
RB (15 X 30) 4.4 0.25 0.03 0.15 0.03 1 0.154 2.83 TA tump 13 D 2 2.18
15 X 20 1 TA lap 13 D 2 2.18
1 TB tump 13 D 2 2.18
Luas pn d13 0.00013267 1 TB lap 13 D 2 2.18
Luas pn Ø10 0.0000785 1 ts tump 10 Ø 0.150 16 0.68 0.12
1 ts lap 10 Ø 0.200 12 0.68 0.12
RINK BALK
NAMA DIMENSI n Volum
Beton Bekisting
Besi
Beton Bekisting
Besi
Beton Bekisting
Besi
Beton Bekisting
Besi
tot Total
Berat/m' Berat Besi Bekisting
panjang berat
SLOOF
Rasio
tot Total
Berat/m' Berat Besi Bekisting
panjang berat
tot Total
Berat/m' Berat Besi Bekisting
panjang berat
BALOK LANTAI 3
Rasio
tot Total
Berat/m' Berat Besi Bekisting
panjang berat
21.70 1.578 102.74 410.97 169.79 14.34
21.70 1.578 102.74 202.21 83.54
21.70 1.578 102.74
21.70 1.578 102.74
1.00 0.617 134.40
1.00 0.617 67.82
12.05 1.042 25.11 100.44 116.23 18.13
12.05 1.042 25.11 90.75 105.02
12.05 1.042 25.11
12.05 1.042 25.11
0.80 0.617 60.17
0.80 0.617 30.58
RINK BALK
Rasio
tot Total
Berat/m' Berat Besi Bekisting
panjang berat
tot Total
Berat/m' Berat Besi Bekisting
panjang berat
Rasio
tot Total
Berat/m' Berat Besi Bekisting
panjang berat
25.02 0.617 30.84 123.37 115.98 14.11
25.02 0.617 30.84 86.13 80.97
25.02 0.617 30.84
25.02 0.617 30.84
0.58 0.395 57.27
0.58 0.395 28.86
DIMENSI Volum
Beton Bekisting
Besi
NAMA n
P (P-) L (L-) T Jenis Tul Ø (mm) Type jarak n
Length (m)
L a b c d
40 D 20 D 15 D 6D
FOOTPLAT
Fp tangga 1.45 0.1 1.00 0.1 0.20 1 0.29 0.98 Tax 12 Ø 0.15 10 1.55 0.14
1 Tay 12 Ø 0.15 7 1.10 0.14
1 Tbx 16 D 0.15 10 1.85 0.19
1 Tby 16 D 0.15 7 1.40 0.19
1.45 0.025 0.12 0.025 0.9 1 0.16 2.83 TP kanan 12 Ø 0.150 7 1.45 0.24
1 TP kiri 12 Ø 0.150 7 1.45 0.24
1 ts 16 D 0.150 11 0.90 0.10
TANGGA
TYPE TANGGA JUMLAH JANGGA VOLUME BETON BESI Kg BEKISTING m²
TANGGA UTAMA LANTAI 1 1 4.749 m³ 657.5 Kg 25.33 m²
TANGGA UTAMA LANTAI 2 1 5.109 m³ 660.1 Kg 25.33 m²
JUMLAH 2
TANGGA UTAMA LANTAI 1
DIMENSI Volum
Beton Bekisting
Besi
NAMA n
P (P-) L T (T-) Jenis Tul Ø Type jarak n
Length
L a b c d
Beton Bekisting
Besi
NAMA n
P (P-) L T (T-) Jenis Tul Ø Type jarak n
Length
L a b c d
Beton Bekisting
Besi
PLAT LANTAI 3 1 0.03 1 0.03 0.12 142.4 17.09 142.43 T ats x 10 D 0.150 16 0.97 0.12
142.4 T ats y 10 D 0.150 16 0.97 0.12
142.4 T ats Tx 10 D 0.150 16 0.97 0.12
Luas pn d10 7.85E-05 142.4 T ats Ty 10 D 0.150 16 0.97 0.12
PLAT GAZEBO 1 0.03 1 0.03 0.1 26.4 2.64 26.45 T ats x 10 D 0.150 16 0.97 0.12
26.4 T ats y 10 D 0.150 16 0.97 0.12
26.4 T ats Tx 10 D 0.150 16 0.97 0.12
Luas pn d10 7.85E-05 26.4 T ats Ty 10 D 0.150 16 0.97 0.12
PLAT DAK ATAP 1 0.03 1 0.03 0.1 12.9 1.29 12.94 T ats x 10 D 0.150 16 0.97 0.12
12.9 T ats y 10 D 0.150 16 0.97 0.12
12.9 T ats Tx 10 D 0.150 16 0.97 0.12
Luas pn d10 7.85E-05 12.9 T ats Ty 10 D 0.150 16 0.97 0.12
Rasio
tot Total
Berat/m' Berat Besi Bekisting
panjang berat
PLAT LANTAI
PANJANG PONDASI BATU BELAH
TYPE 1
HORIZONTAL 9.85 6.15 5.3 1.5 4 1.5 15.85 5.85 3.65 1.15 2.5 1.85 2.5 1.5 = 63.15 112.9 m'
VERTIKAL 14.5 3 6.93 16.93 2 0.8 4.05 1.5 = 49.71
TIPE 2
HORIZONTAL 17 10.85 = 27.85 100.9 m'
VERTIKAL 35 1 37 = 73
TYPE ROLLAG 1
HORIZONTAL 4 9.6 11 1.2 1.2 = 27 65.96 m'
VERTIKAL 13.82 2 2 4.75 4.75 5.82 5.82 = 38.96
TYPE ROLLAG 2
HORIZONTAL = 11.05 12.7 m'
VERTIKAL = 1.65
PANJANG SLOOF
TYPE BS1
HORIZONTAL 9.7 6.15 4.15 16 5.85 = 41.85 90.56 m'
VERTIKAL 14.35 6.93 16.93 10.5 = 48.71
TYPE BSP
HORIZONTAL 17 5.45 3.8 2.65 1.3 2 2.65 1.5 1.5 1.5 = 39.35 113.3 m'
VERTIKAL 35 1.15 17.43 8.63 2.15 4.1 1.5 1 1.5 1.5 = 73.96
JUMLAH KOLOM
- KOLOM PEDESTAL
KOLOM TYPE K1 = 15 buah Tinggi Kolom = 2.9 m
KOLOM TYPE KP = 19 buah
- KOLOM PAGAR
KOLOM TYPE KP = 30 buah Tinggi Kolom = 3.45 m
- LANTAI 1
KOLOM TYPE K1 = 15 buah Tinggi Kolom = 3.5 m
KOLOM TYPE KP = 19 buah
- LANTAI 2
KOLOM TYPE K1 = 15 buah Tinggi Kolom = 4m
KOLOM TYPE KP = 21 buah
- LANTAI 3
KOLOM TYPE K1 = 15 buah Tinggi Kolom = 3.5 m
KOLOM TYPE KP = 14 buah
PANJANG BALOK
- LANTAI 2
TYPE B(25x55)
HORIZONTAL 3.85 = 3.85 32.55 m'
VERTIKAL 14.35 14.35 = 28.7
TYPE B(25x50)
HORIZONTAL 9.7 15.7 15.7 11.85 11.85 = 64.8 98.6 m'
VERTIKAL 1.35 2.45 16.85 13.15 = 33.8
TYPE B(20x40)
HORIZONTAL 11.85 3.85 1.35 = 17.05 52.9 m'
VERTIKAL 1.5 4.35 16.85 13.15 = 35.85
- LANTAI 3
TYPE B(25x55)
HORIZONTAL 3.85 = 3.85 32.55 m'
VERTIKAL 14.35 14.35 = 28.7
TYPE B(25x50)
HORIZONTAL 9.7 9.7 9.7 5.85 5.85 = 40.8 61.5 m'
VERTIKAL 1.35 2.5 16.85 = 20.7
TYPE B(20x40)
HORIZONTAL 3.85 5.85 = 9.7 30.9 m'
VERTIKAL 4.35 16.85 = 21.2
TYPE RB(20x40)
HORIZONTAL 6 6 = 12 18.3 m'
VERTIKAL 6.3 = 6.3
TYPE RB(15x30)
VERTIKAL 4.35 = 4.35 4.35 m'
- RING BALK
TYPE RB(20x40)
HORIZONTAL 5.85 5.85 5.85 5.85 = 23.4 43.4 m'
VERTIKAL 3.7 3.7 6.3 6.3 = 20
TYPE RB(15x30)
HORIZONTAL 3.85 3.85 3.85 3.85 = 15.4 24.1 m'
VERTIKAL 4.35 4.35 = 8.7
TYPE RB(15x20)
HORIZONTAL 5.85 5.85 = 11.7 16.7 m'
VERTIKAL 2.5 2.5 = 5
- PLAT GAZEBO
LUAS 1 4.15 4.15 = 17.22 m²
LUAS 2 1.5 4.42 = 6.63 m²
LUAS 3 1.5 1.73 = 2.595 m²
26.45 m²
PANJANG DINDING
- LANTAI 1
HORIZONTAL 10 1.5 3.85 1.5 6.15 10 3.65 4.35 2.5 1.5 = 45 m' 103 m'
VERTIKAL 14.37 4.35 3 14.37 14.37 2.08 0.95 3 1.5 = 57.99 m'
- PAGAR
HORIZONTAL 17 11 = 28 85.43 m'
VERTIKAL 35 17.43 5 = 57.43
- TERAS
HORIZONTAL 6 = 6 10.86 m'
VERTIKAL 2.43 2.43 = 4.86
- KOLAM IKAN
HORIZONTAL 4 8.95 1.1 1.1 = 15.15 50.03 m'
VERTIKAL 13.58 4.75 4.75 5.9 5.9 = 34.88
- DINDING ELEVASI
HORIZONTAL 5.3 m'
- LANTAI 2
HORIZONTAL 5.85 4 1.5 4 1.85 2.5 4.08 4 4 3.85 2 9.7 = 47.33 116.9 m'
VERTIKAL 15.7 1.5 6.85 3.7 3.7 16.85 2 6.08 13.15 = 69.53
- LANTAI 3
HORIZONTAL 9.7 2 3.85 4 3.85 4 1.85 3.87 5.58 1.5 = 40.2 92.74 m'
VERTIKAL 15.7 1.5 6.93 2.08 16.93 3.7 3.7 2 = 52.54
TRASRAM KM
-LANTAI 1
KM TYPE 1
HORIZONTAL 1.5 1.5 = 3 6 x 3 = 18 m'
VERTIKAL 1.5 1.5 = 3
-LANTAI 2
KM TYPE 1
HORIZONTAL 1.5 1.5 = 3 6 m'
VERTIKAL 1.5 1.5 = 3
KM TYPE 2
HORIZONTAL 2.5 2.5 = 5 9 m'
VERTIKAL 2 2 = 4
KM TYPE 3
HORIZONTAL 2 2 = 4 = 8 m'
VERTIKAL 2 2 = 4
-LANTAI 3
KM TYPE 1
HORIZONTAL 1.5 1.5 = 3 = 6 m'
VERTIKAL 1.5 1.5 = 3
KM TYPE 3
HORIZONTAL 2 2 = 4 = 8 m'
VERTIKAL 2 2 = 4
- Lantai 1
Dinding KM Type 1 4.7 3 = 14.1 m'
- Lantai 2
Dinding KM Type 1 4.7 m'
Dinding KM Type 2 7.7 m'
Dinding KM Type 3 6.7 m'
- Lantai 3
Dinding KM Type 1 4.7 m'
Dinding KM Type 3 6.7 m'
PEKERJAAN LANTAI
-LANTAI 1
PAS. PAVING BLOCK 6 17.43 = 104.6 m²
PAS. KERAMIK GARASI (40X40) 1.8 1.5 = 2.7 m²
1.85 0.85 = 1.573 m² - LANTAI 1
2.2 2.15 = 4.73 m²
7 5.85 = 40.95 m² JUMLAH PASANGAN KRAMIK (40X40) = 214.0 m²
49.95 m² JUMLAH PASANGAN KRAMIK (30X30) = 31.682 m²
PAS. KERAMIK K. TDR TAMU(40X40) 2.35 1.5 = 3.525 m² JUMLAH PASANGAN KRAMIK (20X20) = 5.4675 m²
3.85 2.85 = 10.97 m² JUMLAH PASANGAN PARKET = 17.223 m²
14.5 m²
PAS. KERAMIK TERAS (40X40) 6 2.43 = 14.58 m²
PAS. KERAMIK R. TAMU (40X40) 5.7 4.35 = 24.8 m²
PAS. KERAMIK R. KELUARGA (40X40) 4.5 1.5 = 6.75 m²
2.9 1.55 = 4.495 m²
2.5 4.45 = 11.13 m²
5.7 4.6 = 26.22 m²
48.59 m²
PAS. KERAMIK R. MAKAN (40X40) 5.85 3.85 = 22.52 m²
5.3 1.55 = 8.215 m²
30.74 m²
PAS. KERAMIK R. DAPUR (40X40) 3.85 3.7 = 14.25 m²
PAS. KERAMIK TERAS B. (40X40) 5.2 1.65 = 8.58 m²
5.35 1.5 = 8.025 m²
16.61 m²
PAS. KERAMIK T. CUCI. (30X30) 1.8 1.35 = 2.43 m²
2.85 1.35 = 3.848 m²
2.2 1.85 = 4.07 m²
2.85 1.5 = 4.275 m²
14.62 m²
PAS. KERAMIK K. PRT (30X30) 2.84 2.35 = 6.674 m²
PAS. KERAMIK MUSHOLLA (30X30) 2.85 2.5 = 7.125 m²
0.95 2 = 1.9 m²
9.025 m²
PAS. KERAMIK KM (20X20) 1.35 1.35 = 5.468 m²
PAS. KERAMIK T. WUDHU (30X30) 1.7 0.8 = 1.36 m²
PAS. PARKET GAZEBO 4.15 4.15 = 17.22 m²
-LANTAI 2
PAS. KERAMIK BALKON 1 (40X40) 5.7 1.08 = 6.156 m² - LANTAI 2
PAS. KERAMIK BALKON 2 (40X40) 3.85 1.05 = 4.043 m²
PAS. KERAMIK K. T. UTAMA (40X40) 5.7 3.55 = 20.24 m² JUMLAH PASANGAN KRAMIK (40X40) = 117.6 m²
1.85 0.8 = 1.48 m² JUMLAH PASANGAN KRAMIK (20X20) = 10.17 m²
1.95 1.35 = 2.633 m² JUMLAH PASANGAN PARKET = 42.045 m²
24.35 m²
PAS. KERAMIK K. TIDUR 1 (40X40) 3.85 2.85 = 10.97 m²
2.35 1.5 = 3.525 m²
14.5 m²
PAS. KERAMIK K. TIDUR 2 (40X40) 3.85 3.7 = 14.25 m²
PAS. KERAMIK K. TIDUR 3 (40X40) 3.7 3.7 = 13.69 m²
PAS. KERAMIK R. KEL (40X40) 6 3.98 = 23.88 m²
9.05 1.85 = 16.74 m²
40.62 m²
PAS. KERAMIK KM 2 (20X20) 2.35 1.85 = 4.348 m²
PAS. KERAMIK KM 1 (20X20) 1.35 1.35 = 1.823 m²
PAS. KERAMIK KM 3 (20X20) 2 2 = 4 m²
PAS. PARKET KAYU ROOF GARDEN 6 2.5 = 15 m²
8.2 1.725 = 14.15 m²
2.15 6 = 12.9 m²
42.05 m²
-LANTAI 3 - LANTAI 3
PAS. KERAMIK PERPUS (40X40) 3.85 2.05 = 7.893 m²
1.75 0.8 = 1.4 m² JUMLAH PASANGAN KRAMIK (40X40) = 116.5 m²
5.65 3.55 = 20.06 m² JUMLAH PASANGAN KRAMIK (20X20) = 5.8225 m²
29.35 m²
PAS. KERAMIK BALKON 1 (40X40) 3.85 1.05 = 4.043 m²
PAS. KERAMIK R. KELUARGA (40X40) 1.85 1.85 = 3.423 m²
6 5.84 = 35.04 m²
1.85 1.2 = 2.22 m²
40.68 m²
PAS. KERAMIK K. TIDUR 1 (40X40) 2.35 1.5 = 3.525 m²
3.85 2.85 = 10.97 m²
14.5 m²
PAS. KERAMIK K. TIDUR 2 (40X40) 3.7 3.7 = 13.69 m²
PAS. KERAMIK GUDANG (40X40) 3.7 3.85 = 14.25 m²
PAS. KERAMIK KM 1 (20X20) 1.35 1.35 = 1.823 m²
PAS. KERAMIK KM 3 (20X20) 2 2 = 4 m²
PEKERJAAN PLAFOND
PLAFOND
- LANTAI 1 50.26 8.825 6.653 1.823 98.43 14.43 1.823 1.823 = 184.1 m²
- LANTAI 2 24.25 4.325 14.82 24.52 14.2 3.4 13.65 14.43 1.823 = 115.4 m²
- LANTAI 3 29.25 63.62 14.2 3.4 13.65 14.43 1.823 = 140.4 m²
LIST PLAFOND
- LANTAI 1 35.6 12.7 10.7 5.4 56.5 16.4 5.4 5.4 = 148.1 m'
- LANTAI 2 24.4 8.4 15.4 24.1 15.1 7.4 14.8 16.4 5.4 = 131.4 m'
- LANTAI 3 24.4 37.85 15.1 7.4 14.8 16.4 5.4 = 121.4 m'
PEKERJAAN KAYU
PEKERJAAN BAJA
KUDA-KUDA TYPE K
2L.60.60.6 1.36 1.38 1.42 1.39 1.36 1.38 1.42 1.39 = 33.3 m'
2L.50.50.5 2.51 2.36 1.39 1.67 2.59 2.73 3.28 2.51 2.36 1.39 1.67 2.59 2.73 = 89.34 m'
JARUM GORDING Ø10 mm 1.38 x 8 x 3 = 33.12 m'
KUDA-KUDA TYPE J
2L.60.60.6 2.51 2.56 2.45 = 30.08 m'
2L.50.50.5 3.42 3.09 2.19 2.4 1.06 6.92 = 76.32 m'
JARUM GORDING Ø10 mm 1.85 x 4 x 4 = 29.6 m'
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN
a. Pembersihan Lahan
Luas lahan :
3700 17.00 x 37.00
1700
Keliling :
19.00 + 39.00 x 2.00
3900
1900
1 2 3 4 5 6
Luas :
300
3.00 x 3.00
300
d. Pembuatan Bowplank
Keliling :
18.00 + 38.00 x 2.00
3800
1800
1 2 3 4 5 6
II PEKERJAAN TANAH
a. Galian Tanah Pondasi
1. Galian Tanah Pondasi Footplat (P1)
VOLUME :
1.95 x 1.90 x 1.9 x 3.00
1 2 3 4 5 6
1 2 3 4 5 6
JUMLAH
c. Urugan Pasir Bawah Lantai
1. Peninggian Carport 101.94 x 0.10 = 10.19 m³
2. Peninggian Teras Depan 14.55 x 0.05 = 0.73 m³
3. Peninggian Kolam Ikan 107.97 x 0.10 = 10.80 m³
4. Peninggian Ruang Tidur Tamu 14.43 x 0.10 = 1.44 m³
5. Peninggian Ruang Keluarga 48.59 x 0.10 = 4.86 m³
6. Peninggian KM 1 1.82 x 0.10 = 0.18 m³
7. Peninggian Dapur 14.25 x 0.10 = 1.42 m³
8. Peninggian Ruang Makan 30.15 x 0.10 = 3.02 m³
9. Peninggian Garasi 49.95 x 0.10 = 5.00 m³
10. Peninggian Musholla 9.13 x 0.10 = 0.91 m³
11. Peninggian Riang Tidur PRT 6.70 x 0.10 = 0.67 m³
12. Peninggian Teras Belakang 16.25 x 0.10 = 1.62 m³
1 2 3 4 5 6
JUMLAH TOTAL VO
d. Urugan Pasir Bawah Pondasi
1. Urugan Pasir Bawah Pondasi Type 1 0.10 x 112.86 = 11.29
2. Urugan Pasir Bawah Pondasi Type 2 0.06 x 100.85 = 6.00
3. Urugan Pasir Bawah Pondasi Footplat P1 0.38 x 1.90 x 3.00 = 2.17
4. Urugan Pasir Bawah Pondasi Footplat P2 0.48 x 2.40 x 8.00 = 9.22
5. Urugan Pasir Bawah Pondasi Footplat P3 0.38 x 1.90 x 8.00 = 5.78
6. Urugan Pasir Bawah Pondasi Footplat Tangga 0.10 x 1.50 x 1.00 = 0.15
7. Urugan Pasir Bawah Rollag Belakang 0.015 x 12.70 = 0.19
8. Urugan Pasir Bawah Rollag Kolom Ikan 0.02 x 65.96 = 1.32
1 2 3 4 5 6
JUM
b. Pasangan Aanstamping
1. Pasangan Pondasi Batu Belah Type 1 0.20 x 112.86 = 22.57 m³
2. Pasangan Pondasi Batu Belah Type 2 0.12 x 100.85 = 12.00 m³
JUMLA
c. Pasangan Rollag Batu Kali 1:5
1. Rollag Teras Belakang 0.09 x 12.70 = 1.14 m³
2. Rollag Kolam Ikan 0.16 x 65.96 = 10.55 m³
3. Rollag Trap Tangga 0.30 x 1.50 = 0.45 m³
JUMLAH TOTAL
- Lantai 2
1. Pas. Dinding Lantai 2 116.86 x 4.00 = 467.44 m²
LUBANG JENDELA & PINTU = 56.95
PAS. DINDING 1 : 3 = 34.50
JUMLAH TOTAL
- Lantai 3
1. Pas. Dinding Lantai 3 92.74 x 3.50 = 324.59 m²
LUBANG JENDELA & PINTU = 59.03
1 2 3 4 5 6
JUMLAH TOTAL
JUMLAH TOTAL
- Lantai 2
1. Pas. Dinding KM Type 1 6.00 x 1.50 = 9.00 m²
2. Pas. Dinding KM Type 2 9.00 x 1.50 = 13.50 m²
3. Pas. Dinding KM Type 3 8.00 x 1.50 = 12.00 m²
JUMLAH TOTAL
- Lantai 3
1. Pas. Dinding KM Type 1 6.00 x 1.50 = 9.00 m²
2. Pas. Dinding KM Type 3 8.00 x 1.50 = 12.00 m²
JUMLAH TOTAL
c. Pas. Dinding Keramik Kamar Mandi
- Lantai 1
1. Pas. Keramik (20x40) Dinding KM Type 1 14.10 x 1.50 = 21.15 m²
1 2 3 4 5 6
- Lantai 2
1. Pas. Keramik (20x40) Dinding KM Type 1 4.70 x 1.50 = 7.05 m²
2. Pas. Keramik (20x40) Dinding KM Type 2 7.70 x 1.50 = 11.55 m²
3. Pas. Keramik (20x40) Dinding KM Type 3 6.70 x 1.50 = 10.05 m²
JUMLAH TOT
- Lantai 2
1. Pas. Batu Alam
JUMLAH TOT
- Lantai 3
1. Pas. Batu Alam
JUMLAH TOT
e. Plesteran t = 15 mm
- Lantai 1
1. Plesteran Dindang Batu Bata 1 : 5 764.9 x 2.00 = 1529.87 m²
2. Plesteran Dindang Batu Bata 1 : 3 27.0 x 2.00 = 54.00 m²
1 2 3 4 5 6
JUMLAH TOT
JUMLAH TOT
- Lantai 2
1. Plesteran Dindang Batu Bata 1 : 5 376.0 x 2.00 = 751.99 m²
2. Plesteran Dindang Batu Bata 1 : 3 34.5 x 2.00 = 69.00 m²
JUMLAH TOT
JUMLAH TOT
- Lantai 3
1. Plesteran Dindang Batu Bata 1 : 5 286.56 x 2.00 = 573.12 m²
2. Plesteran Dindang Batu Bata 1 : 3 21.0 x 2.00 = 42.00 m²
JUMLAH TOT
JUMLAH TOT
f. Pas. Acian Dinding
- Lantai 1
1. Acian Dindang Batu Bata 1 : 5 1529.87 - 54.51 - 129.93 = 1345.4
2. Acian Dindang Batu Bata 1 : 3 54.00 - 21.15 = 32.85
JU
- Lantai 2
1. Acian Dindang Batu Bata 1 : 5 751.99 - 7.40 = 744.59
2. Acian Dindang Batu Bata 1 : 3 69.00 - 28.65 = 40.35
JU
- Lantai 3
1. Acian Dindang Batu Bata 1 : 5 573.12 - 7.40 - 16.26 = 549.46
2. Acian Dindang Batu Bata 1 : 3 42.00 - 17.10 = 24.90
JU
1 2 3 4 5 6
3. PEKERJAAN LANTAI
a. Pasangan Keramik (40x40)
- Lantai 1
1. Pas. Keramik Garasi 1.80 x 1.50 = 2.70 m²
1.85 x 0.85 = 1.57 m²
2.20 x 2.15 = 4.73 m²
7.00 x 5.85 = 40.95 m²
1 2 3 4 5 6
1 2 3 4 5 6
JUMLAH TOTAL V
4. PEKERJAAN PELAFON
1 2 3 4 5 6
JUMLAH TO
JUMLAH TO
JUMLAH TO
b. List tepi plafond profil gypsum
1. Lantai 1 148.10 m'
2. Lantai 2 131.40 m'
3. Lantai 3 121.35 m'
JUMLAH TOTAL
JUMLAH TOTAL
JUMLAH TOTAL
5. PEKERJAAN RAILLING DAN ACP
a. Railling Tangga & void : 0.67 + 3.65 + 2.56 + 4.40
JUMLAH T
1 2 3 4 5 6
c. Railling Balkon
- Lantai 1 2.60 + 6.60 = 9.20 m'
- Lantai 2 5.75 + 3.85 = 9.60 m'
- Lantai 3 3.85 = 3.85 m'
JUMLAH TOTAL V
JUMLAH TOTAL V
6. PEKERJAAN KAYU
a. Kayu Pagar Vertikal Garden (6/12) 289.35 x 0.01 = 2.08 m³
b. Kayu Atap Gazebo (5/10) 66.50 x 0.05 = 3.33 m³
JUMLA
JUMLA
Luasan Kaca
2.70 x 0.60 = 1.62 x 2.00
1.95 x 0.60 = 1.17 x 2.00
1.40 x 0.60 = 0.84 x 1.00
Jumlah Total Luasan Kaca
5
1 2 3 4 5 6
Luasan Kaca
1.43 x 1.00 = 1.43 x 2.00
1.33 x 0.90 = 1.20 x 2.00
0.80 x 0.80 = 0.64 x 1.00
1.94 x 0.40 = 0.78 x 1.00
90
Jumlah Total Luasan Kaca
1 2 3 4 5 6
Luasan Kaca
2.70 x 0.90 = 2.43 x 4.00
0.70 x 0.60 = 0.42 x 1.00
1.94 x 0.64 = 1.24 x 1.00
Jumlah Total Luasan Kaca
Luasan Kaca
1.00 x 0.70 = 0.7 x 2.00
1.95 x 0.90 = 1.76 x 2.00
0.70 x 0.50 = 0.35 x 1.00
270
2.05 x 0.50 = 1.03 x 1.00
0.80 x 0.70 = 0.56 x 1.00
1.94 x 0.64 = 1.24 x 1.00
1 2 3 4 5 6
1 2 3 4 5 6
5. Kusen Type J1
Kusen Jendela
Panjang Vertikal
2.90 + 2.90 + 2.90
Panjang Horizontal
1.70 + 1.70
Jumlah Total
Jumlah Kusen J1 = 1 Unit
Luasan Kaca
2.70 x 0.68 x 2.00
Jumlah Total Luasan Kaca
Daun Jendela
Jendela = 2.80 x 0.78 = 2.18
6. Kusen Type J2
Kusen Jendela
Panjang Vertikal
2.90 + 2.90
Panjang Horizontal
1.10 + 1.10 + 1.10
Jumlah Total
Jumlah Kusen J2 = 1 Unit
Luasan Kaca
1.28 x 0.90 =
1.38 x 1.00 =
Jumlah Total Luasan Kaca
Daun Jendela
Jendela = 1.38 x 1.00 = 1.38
1 2 3 4 5 6
7. Kusen Type J3
Kusen Jendela
Panjang Vertikal
2.35 + 2.35 + 2.35 + 2.35
Panjang Horizontal
3.20 + 3.20
Jumlah Total
Jumlah Kusen J3 = 1 Unit
Luasan Kaca
2.15 x 0.90 = 1.94 x 3.00
Jumlah Total Luasan Kaca
Daun Jendela
Jendela = 2.25 x 1.00 = 2.25
1 2 3 4 5 6
7. Kusen Type J4
Kusen Jendela
Panjang Vertikal
2.00 + 2.00
Panjang Horizontal
1.10 + 1.10
Jumlah Total
Jumlah Kusen J4 = 1 Unit
Luasan Kaca
1.80 x 0.90 =
Jumlah Total Luasan Kaca
Daun Jendela
Jendela = 1.90 x 1.00 = 1.90
8. Kusen J5
Kusen Jendela
Panjang Vertikal
2.00 + 2.00 + 2.00
Panjang Horizontal
2.15 + 2.15
Jumlah Total
Jumlah Kusen J5 = 8 Unit
Luasan Kaca
1.80 x 0.90 = 1.62 x 2.00
Jumlah Total Luasan Kaca
Daun Jendela
Jendela = 1.90 x 1.00 = 1.90
9. Kusen Type J6
1 2 3 4 5 6
Panjang Vertikal
9.70 + 9.70
Panjang Horizontal
1.10 x 10.00
Jumlah Total
Jumlah Kusen J6 = 1 Unit
Luasan Kaca
1.21 x 1.00 =
1.00 x 1.00 = 1.00 x 8.00
Jumlah Total Luasan Kaca
Luasan Kaca
2.40 x 1.00 =
2.40 x 0.60 = 1.44 x 5.00
Jumlah Total Luasan Kaca
1 2 3 4 5 6
Luasan Kaca
0.50 x 0.40 =
Jumlah Total Luasan Kaca
Luasan Kaca
1.00 x 0.40 =
Jumlah Total Luasan Kaca
Daun Pintu
Pintu = 2.10 x 0.80 = 1.68
2,5
1 2 3 4 5 6
2,5
Jumlah Total
Jumlah Pintu P2 = 8 Unit
1 2 3 4 5 6
8. PEKERJAAN CAT
a. Pekerjaan Cat Dinding Luar (exterior)
- Lantai 1 764.9 + 27.00 - 54.51 - 129.93
- Lantai 2 376.0 + 28.65 - 7.40
- Lantai 3 286.56 + 21.00 - 7.40
JUMLAH TOTAL
JUMLAH TOTAL
JUMLAH TOTAL
1 2 3 4 5 6
JUMLAH
JUMLAH
JUMLA
JUMLAH TOTAL
IV PEKERJAAN STRUKTUR
1. PEKERJAAN SUB STRUKTUR
a. Lantai Kerja
1. Lantai Kerja Pondasi Footplat (P1) 1.90 x 1.90 x 0.05 x
2. Lantai Kerja Pondasi Footplat (P2) 2.40 x 2.40 x 0.05 x
3. Lantai Kerja Pondasi Footplat (P3) 1.90 x 1.90 x 0.05 x
4. Lantai Kerja pada Lantai 1 164.20 x 0.05
1 2 3 4 5 6
c. Footplat Type P1
- Beton K-250
- Besi
- Bekesting
d. Footplat Type P2
- Beton K-250
- Besi
- Bekesting
e. Footplat Type P3
- Beton K-250
- Besi
- Bekesting
1 2 3 4 5 6
a. Pekerjaan Lantai 1
- Kolom (40x40)
- Beton K-250
- Besi
- Bekesting
- Kolom (15x15)
- Beton K-225
- Besi
- Bekesting
- Tangga Utama
- Beton K-250
- Besi
- Bekesting
1 2 3 4 5 6
b. Pekerjaan Lantai 2
- Kolom (40x40)
- Beton K-250
- Besi
- Bekesting
- Kolom (15x15)
- Beton K-225
- Besi
- Bekesting
- Balok (25x55)
- Beton K-250
- Besi
- Bekesting
- Balok (25x50)
- Beton K-250
- Besi
- Bekesting
- Balok (20x40)
- Beton K-250
- Besi
- Bekesting
- Tangga
- Beton K-250
- Besi
- Bekesting
- Plat Lantai 2
- Beton K-250
- Besi
- Bekesting
1 2 3 4 5 6
c. Pekerjaan Lantai 3
- Kolom (40x40)
- Beton K-250
- Besi
- Bekesting
- Kolom (15x15)
- Beton K-225
- Besi
- Bekesting
- Balok (25x55)
- Beton K-250
- Besi
- Bekesting
- Balok (25x50)
- Beton K-250
- Besi
- Bekesting
- Balok (20x40)
- Beton K-250
- Besi
- Bekesting
1 2 3 4 5 6
- Balok RB (20x40)
- Beton K-250
- Besi
- Bekesting
- Balok RB (15x30)
- Beton K-250
- Besi
- Bekesting
- Plat Lantai 3
- Beton K-250
- Besi
- Bekesting
- Balok RB (15x30)
- Beton K-250
- Besi
- Bekesting
e. Pekerjaan Atap
- Kuda-kuda Type K
- 2L.60.60.6 33.30 x 10.85
- 2L.50.50.5 89.34 x 7.54
- Jarum Gording Ø10 mm 33.12 x 0.617
1 2 3 4 5 6
- Kuda-kuda Type J
- 2L.60.60.6 30.08 x 10.85
- 2L.50.50.5 76.32 x 7.54
- Jarum Gording Ø10 mm 29.60 x 0.617
V PEKERJAAN MEP
- Pekerjaan Mekanikal Elektrikal
1. Pekerjaan Penerangan
a. Lampu TL Balk 1 X 36 Watt
- Lantai 1 7.00 Titik
- Lantai 2 1.00 Titik
- Lantai 3 1.00 Titik
1 2 3 4 5 6
4. Pekerjaan Istalasi AC
a. Pekerjaan Indor Unit Ac /Wall Mounted Type
- Lantai 1 3.00 Unit
- Lantai 2 5.00 Unit
- Lantai 3 3.00 Unit
1 2 3 4 5 6
- Pekerjaan Sanitasi
1. Pekerjaan Pas. Closet duduk
a. Pekerjaan Pas. Closet duduk
- Lantai 1 3.00 Buah
- Lantai 2 3.00 Buah
- Lantai 3 2.00 Buah
1 2 3 4 5 6
8. Pekerjaan bioseptictank
a. Pekerjaan bioseptictank 1.00 unit
1 2 3 4 5 6
7 8 9 10
629.00 m²
116.00 m
7 8 9 10
9.00 m²
112.00 m
1.00 ls
1.00 ls
1.00 ls
7 8 9 10
= 21.12 m³
= 46.08 m³
= 29.64 m³
= 1.50 m³
7 8 9 10
= 144.35 m³
= 128.99 m³
7 8 9 10
= 11.87 m³
7 8 9 10
m³
m³
m³
m³
m³
m³
m³
m³
7 8 9 10
m²
m²
m²
m²
m²
7 8 9 10
m²
7 8 9 10
= 16.44 m²
= 38.07 m²
= 7.40 m²
= 7.40 m²
7 8 9 10
m²
m²
m²
m²
m²
m²
7 8 9 10
7 8 9 10
7 8 9 10
m²
m²
m²
m²
m²
m²
7 8 9 10
= 11.28 m'
= 8.10 m'
7 8 9 10
m²
m²
= 11.60 m'
= 6.45 m'
18.05 m'
18.05 m'
= 3.24 m²
= 2.34 m²
= 0.84 m²
= 6.42 m²
x 2.00 = 3.15 m²
7 8 9 10
x 2.00 = 4.13 m²
12.00 m'
8.20 m'
20.20 m'
20.20 m'
= 2.86 m²
= 2.39 m²
= 0.64 m²
= 0.78 m²
= 6.67 m²
x 1.00 = 1.62 m²
x 2.00 = 2.60 m²
7 8 9 10
10.30 m'
27.70 m'
27.70 m'
= 9.72 m²
= 0.42 m²
= 1.24 m²
= 11.38 m²
x 1.00 = 1.68 m²
x 4.00 = 11.20 m²
x 1.00 = 0.56 m²
9.80 m'
24.30 m'
24.30 m'
= 1.40 m²
= 3.51 m²
= 0.35 m²
= 1.03 m²
= 0.56 m²
= 1.24 m²
7 8 9 10
= 8.09 m²
x 1.00 = 1.68 m²
x 2.00 = 4.10 m²
7 8 9 10
8.70 m'
3.40 m'
12.10 m'
12.10 m'
= 3.67 m²
= 3.67 m²
x 2.00 = 4.37 m²
5.80 m'
3.30 m'
9.10 m'
9.10 m'
= 1.15 m²
= 1.38 m²
= 2.53 m²
x 1.00 = 1.38 m²
7 8 9 10
9.40 m'
6.40 m'
15.80 m'
15.80 m'
= 5.81 m²
= 5.81 m²
x 3.00 = 6.75 m²
7 8 9 10
4.00 m'
2.20 m'
6.20 m'
6.20 m'
= 1.62 m²
= 1.62 m²
x 1.00 = 1.90 m²
6.00 m'
4.30 m'
10.30 m'
82.40 m'
= 3.24 m²
= 3.24 m²
7 8 9 10
19.40 m'
11.00 m'
30.40 m'
30.40 m'
= 1.21 m²
= 8.00 m²
= 9.21 m²
30.00 m'
9.40 m'
39.40 m'
39.40 m'
= 2.40 m²
= 7.20 m²
= 9.60 m²
7 8 9 10
1.00 m'
1.20 m'
2.20 m'
15.40 m'
= 0.20 m²
= 0.20 m²
1.00 m'
2.20 m'
3.20 m'
3.20 m'
= 0.40 m²
= 0.40 m²
4.30 m'
0.90 m'
5.20 m'
62.40 m'
x 12.00 = 20.16 m²
7 8 9 10
7 8 9 10
= 607.50 m²
= 397.24 m²
300.16 m²
JUMLAH TOTAL VOLUME PEK. CAT DINDING LUAR (EXTERIOR) LANTAI 1 = 607.50 m²
JUMLAH TOTAL VOLUME PEK. CAT DINDING LUAR (EXTERIOR) LANTAI 2 = 397.24 m²
JUMLAH TOTAL VOLUME PEK. CAT DINDING LUAR (EXTERIOR) LANTAI 3 = 300.16 m²
m²
m²
m²
JUMLAH TOTAL VOLUME PEK. CAT DINDING LUAR (INTERIOR) LANTAI 1 = 432.52 m²
JUMLAH TOTAL VOLUME PEK. CAT DINDING LUAR (INTERIOR) LANTAI 2 = 375.99 m²
JUMLAH TOTAL VOLUME PEK. CAT DINDING LUAR (INTERIOR) LANTAI 3 = 290.46 m²
7 8 9 10
m'
m'
= 42.95 m²
= 71.75 m²
61.10 m'
= 0.00 m³
= 0.00 m³
= 0.00 m³
= 8.21 m³
7 8 9 10
0.45 m³
110.88 kg
3.81 m²
2.70 m³
171.69 kg
7.20 m²
12.80 m³
579.94 kg
25.60 m²
7.20 m³
215.58 kg
19.20 m²
6.96 m³
1,306.19 kg
69.60 m²
1.25 m³
569.46 kg
33.06 m²
6.93 m³
1,366.64 kg
72.45 m²
4.15 m³
824.35 kg
56.66 m²
7 8 9 10
8.38 m³
1,543.22 kg
84.00 m²
1.52 m³
463.15 kg
39.90 m²
2.37 m³
725.97 kg
62.10 m²
1.47 m³
196.66 kg
14.11 m²
1.06 m³
196.95 kg
14.11 m²
4.75 m³
657.45 kg
25.33 m²
7 8 9 10
2.64 m³
1,137.43 kg
26.45 m²
9.56 m³
1,737.05 kg
96.00 m²
1.91 m³
576.38 kg
50.40 m²
4.29 m³
689.11 kg
43.94 m²
11.81 m³
1,902.49 kg
123.25 m²
2.40 m³
490.96 kg
32.55 m²
5.11 m³
660.12 kg
25.33 m²
26.80 m³
9,604.70 kg
223.33 m²
7 8 9 10
8.37 m³
1,556.37 kg
84.00 m²
1.12 m³
332.00 kg
29.40 m²
4.29 m³
689.11 kg
43.94 m²
7.36 m³
1,189.80 kg
76.88 m²
2.40 m³
490.96 kg
32.55 m²
7 8 9 10
1.38 m³
253.93 kg
18.30 m²
0.15 m³
31.94 kg
2.83 m²
17.09 m³
6,125.28 kg
142.43 m²
1.29 m³
556.47 kg
12.94 m²
2.42 m³
613.19 kg
34.72 m²
0.86 m³
191.19 kg
15.67 m²
361.31 kg
673.62 kg
20.42 kg
170.56 kg
424.73 kg
6.81 kg
7 8 9 10
326.37 kg
575.45 kg
18.25 kg
3,605.69 kg
124.90 kg
7.00 Titik
1.00 Titik
1.00 Titik
11.00 Titik
19.00 Titik
8.00 Titik
11.00 Titik
19.00 Titik
8.00 Titik
7 8 9 10
2.00 Titik
- Titik
- Titik
11.00 Buah
9.00 Buah
7.00 Buah
1.00 Buah
1.00 Buah
- Buah
3.00 Buah
5.00 Buah
3.00 Buah
3.00 Buah
3.00 Buah
2.00 Buah
9.00 Buah
9.00 Buah
6.00 Buah
6.00 Buah
4.00 Buah
3.00 Buah
7 8 9 10
1.00 Buah
1.00 Buah
1.00 Buah
155.00 Buah
155.00 Buah
130.00 Buah
3.00 Buah
3.00 Buah
2.00 Buah
- Buah
1.00 Buah
- Buah
7 8 9 10
6.00 Buah
3.00 Buah
2.00 Buah
3.00 Buah
3.00 Buah
2.00 Buah
3.00 Buah
2.00 Buah
2.00 Buah
1.00 Buah
1.00 Buah
- Buah
2.00 Unit
1.00 Unit
57.76 m'
33.00 m'
26.35 m'
35.00 m'
23.60 m'
18.45 m'
7 8 9 10
41.30 m'
51.10 m'
38.30 m'
I. PEKERJAAN PERSIAPAN
A SUB STRUKTUR
- Besi 579.94
- Bekisting 25.60
5 Footplat type P3
- Beton K-250 7.20
- Besi 215.58
- Bekisting 19.20
- LANTAI 1
1 Kolom (40x40)
- Beton K-250 8.38
- Besi 1,543.22
- Bekisting 84.00
2 Kolom (15x15)
- Beton K-255 1.52
- Besi 463.15
- Bekisting 39.90
3 Kolom pagar (15x15)
- Beton K-255 2.37
- Besi 725.97
- Bekisting 62.10
4 Ringbalk pagar (15x15)
- Beton K-255 1.47
- Besi 196.66
- Bekisting 14.11
5 Ringbalk dinding kolam (15x15)
- Beton K-255 1.06
- Besi 196.95
- Bekisting 14.11
6 Tangga utama
- Beton K-250 4.75
- Besi 657.45
- Bekisting 25.33
7 Plat lantai gazebo
- Beton K-250 2.64
- Besi 1,137.43
- Bekisting 26.45
- LANTAI 2
1 Kolom (40x40)
- Beton K-250 9.56
- Besi 1,737.05
- Bekisting 96.00
2 Kolom (15x15)
- Beton K-250 1.91
- Besi 576.38
- Bekisting 50.40
3 Balok (25x55)
- Beton K-250 4.29
- Besi 689.11
- Bekisting 43.94
4 Balok (25x50)
- Beton K-250 11.81
- Besi 1,902.49
- Bekisting 123.25
5 Balok (20x40)
- Beton K-250 2.40
- Besi 490.96
- Bekisting 32.55
6 Tangga utama
- Beton K-250 5.11
- Besi 660.12
- Bekisting 25.33
7 Plat lantai 2
- Beton K-250 26.80
- Besi 9,604.70
- Bekisting 223.33
- LANTAI 3
1 Kolom (40x40)
- Beton K-250 8.37
- Besi 1,556.37
- Bekisting 84.00
2 Kolom (15x15)
- Beton K-250 1.12
- Besi 332.00
- Bekisting 29.40
3 Balok (25x55)
- Beton K-250 4.29
- Besi 689.11
- Bekisting 43.94
4 Balok (25x50)
- Beton K-250 7.36
- Besi 1,189.80
- Bekisting 76.88
5 Balok (20x40)
- Beton K-250 2.40
- Besi 490.96
- Bekisting 32.55
6 Balok RB (20x40)
- Beton K-250 1.38
- Besi 253.93
- Bekisting 18.30
7 Balok RB (15x30)
- Beton K-250 0.15
- Besi 31.94
- Bekisting 2.83
8 Plat lantai 3
- Beton K-250 17.09
- Besi 6,125.28
- Bekisting 142.43
9 Plat dak atap
- Beton K-250 1.29
- Besi 556.47
- Bekisting 12.94
- RING BALK
1 Balok RB (20x40)
- Beton K-250 2.42
- Besi 613.19
- Bekisting 34.72
2 Balok RB (15x30)
- Beton K-250 0.86
- Besi 191.19
- Bekisting 15.67
- ATAP
1 Kuda-kuda type K
- 2L.60.60.6 361.31
- 2L.50.50.5 673.62
- Jarum Gording Ø10 mm 20.42
2 Kuda-kuda type K'
- 2L.60.60.6 170.56
- 2L.50.50.5 424.73
- Jarum Gording Ø10 mm 6.81
3 Kuda-kuda type J
- 2L.60.60.6 326.37
- 2L.50.50.5 575.45
- Jarum Gording Ø10 mm 18.25
IV PEKERJAAN ARSITEKTUR
- LANTAI 1
A PEKERJAAN PASANGAN
C PEKERJAAN LANTAI
3 Pintu type P1
- Kusen alumunium 15.60
- Daun pintu 5.04
- Engsel Pintu 9.00
- Kunci pintu tanam 3.00
5 Jendela type J1
- Kusen alumunium 12.10
- Daun jendela 4.37
- Kaca bening t = 5 mm 3.67
- Engsel Jendela 4.00
- Kunci Jendela geser 2.00
6 Jendela type J2
- Kusen alumunium 9.10
- Daun jendela 1.38
- Kaca bening t = 5 mm 2.53
- Engsel Jendela 2.00
- Kunci Jendela geser 1.00
7 Jendela type J3
- Kusen alumunium 15.80
- Daun jendela 6.75
- Kaca bening t = 5 mm 5.81
- Engsel Jendela 6.00
- Kunci Jendela geser 3.00
8 Jendela type J4
- Kusen alumunium 6.20
- Daun jendela 1.90
9 Jendela type BV
- Kusen alumunium 6.60
- Kaca buram t = 5 mm 0.60
E PEKERJAAAN PELAFOND
G PEKERJAAN CAT
- LANTAI 2
A PEKERJAAN PASANGAN
C PEKERJAAN LANTAI
3 Pintu type P1
- Kusen alumunium 26.00
- Daun pintu 8.40
- Engsel pintu 15.00
- Kunci pintu tanam 5.00
5 Jendela type J5
- Kusen alumunium 20.60
- Daun jendela 7.60
- Kaca bening t = 5 mm 6.48
- Engsel jendela 4.00
6 Jendela type BV
- Kusen alumunium 4.40
- Kaca buram t = 5 mm 0.40
E PEKERJAAAN PELAFOND
G PEKERJAAN CAT
- LANTAI 3
A PEKERJAAN PASANGAN
C PEKERJAAN LANTAI
2 Pintu type P1
- Kusen alumunium 20.80
- Daun pintu 6.72
- Engsel pintu 12.00
- Kunci pintu tanam 4.00
4 Jendela type J5
- Kusen alumunium 51.50
- Daun jendela 19.00
- Kaca bening t = 5 mm 16.20
- Engsel jendela 20.00
- Kunci jendela geser 10.00
5 Jendela type J6
- Kusen alumunium 30.40
- Kaca bening t = 5 mm 9.21
6 Jendela type J7
- Kusen alumunium 39.40
- Kaca bening t = 5 mm 9.60
7 Jendela type BV
- Kusen alumunium 4.40
E PEKERJAAAN PELAFOND
G PEKERJAAN CAT
- ATAP
V PEKERJAAN MEP
- LANTAI 1
B PEKERJAAN SANITASI
- LANTAI 2
B PEKERJAAN SANITASI
- LANTAI 3
B PEKERJAAN SANITASI
m²
m'
m'
ls
ls
m²
m²
unit
m³
m³
m³
m³
m³
m³
m³
m³
Kg
m²
m³
Kg
m²
m³
Kg
m²
m³
Kg
m²
m³
Kg
m²
m³
Kg
m²
m³
Kg
m²
m³
Kg
m²
m³
Kg
m²
m³
Kg
m²
m³
Kg
m²
m³
Kg
m²
m³
Kg
m²
m³
Kg
m²
m³
Kg
m²
m³
Kg
m²
m³
Kg
m²
m³
Kg
m²
m³
Kg
m²
m³
Kg
m²
m³
Kg
m²
m³
Kg
m²
m³
Kg
m²
m³
Kg
m²
m³
Kg
m²
m³
Kg
m²
m³
Kg
m²
m³
Kg
m²
m³
Kg
m²
m³
Kg
m²
m³
Kg
m²
m³
Kg
m²
m³
Kg
m²
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m'
m²
m²
m²
buah
buah
buah
buah
m'
m²
m²
m²
buah
buah
buah
buah
m'
m²
buah
buah
unit
m'
m²
m²
buah
buah
m'
m²
m²
buah
buah
m'
m²
m²
buah
buah
m'
m²
m²
buah
buah
m'
m²
m²
m'
m'
m'
m'
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m'
m²
m²
m²
buah
buah
buah
buah
m'
m²
m²
m²
buah
buah
buah
buah
m'
m²
buah
buah
unit
m'
m²
m²
buah
buah
m'
m²
m'
m²
m²
m'
m'
m'
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m'
m²
m²
m²
buah
buah
buah
buah
m'
m²
buah
buah
unit
m'
m²
m²
buah
buah
m'
m²
m'
m²
m'
m²
m²
m'
m'
m²
m²
m²
m²
m²
m²
m²
m'
titik
titik
titik
titik
buah
buah
buah
buah
buah
buah
unit
m'
unit
buah
buah
buah
buah
buah
buah
buah
m'
m'
m'
m²
buah
buah
titik
titik
titik
buah
buah
buah
buah
buah
buah
unit
m'
unit
buah
buah
buah
buah
buah
buah
m'
m'
m'
m²
titik
titik
titik
buah
buah
buah
buah
buah
buah
unit
m'
unit
buah
buah
buah
buah
buah
buah
m'
m'
m'
m²
HARGA
NO. URAIAN PEKERJA SATUAN MINIMUM MAKSIMUM
(Rp) (Rp)
1 Pekerja Hr 75,000 85,000
2 Mandor Hr 100,000 110,000
3 Tukang listrik Hr 95,000 105,000
4 Tukang kayu Hr 95,000 105,000
5 Kep. tk. kayu Hr 110,000 120,000
6 Tukang batu Hr 95,000 105,000
7 Kep. tk. batu Hr 110,000 120,000
8 Tukang besi Hr 95,000 105,000
9 Kep. tk. besi Hr 110,000 120,000
10 T u k a n g c a t Hr 95,000 105,000
11 K e p . t k . c a t Hr 110,000 120,000
12 T u k a n g p l i t u r Hr 95,000 105,000
13 T u k a n g j a l a n Hr 75,000 85,000
14 T u k a n g g a l i Hr 75,000 85,000
15 Tukang masak aspal Hr 75,000 85,000
16 T k . l e i d e n g Hr 95,000 105,000
17 M a s i n i s Hr 150,000 175,000
18 P e m b . M a s i n i s Hr 100,000 125,000
19 P e n j a g a a p i Hr 75,000 85,000
20 P e n j a g a m a l a m Hr 75,000 85,000
21 Sopir Hr 140,000 150,000
22 Pembantu Sopir Hr 85,000 100,000
HARGA
NO. J E N I S B A H A N SAT MINIMUM
(Rp)
I BAHAN DASAR
1 BATU KALI
Bulat Belah m3 260,000.00
2 KERIKIL
Beton 1/2 m3 300,000.00
3 BATU BATA
ex lokal bh 600.00
4 PASIR Urug m3 160,000.00
Pasang m3 310,000.00
Beton m3 350,000.00
5 TANAH Padas m3 120,000.00
6 PORTLAND CEMENT
Merk I 50 kg zak 52,500.00
Merk II 50 kg zak 52,000.00
Semen Putih 50 kg zak 90,000.00
Semen warna kg 11,000.00
Semen khusus (MU-408) kg
Semen khusus (MU-440) kg
Semen khusus (MU-450) kg
Semen khusus (MU-460) kg
2 Keramik 30 X 30 cm m2 37,000.00
20 X 20 cm m2 46,500.00
3 Ubin Keramik Dinding 30 x 25 cm m2 50,000.00
4 Parquet Jati m2 210,000.00
5 Batu Paros m2 110,000.00
6 GRANITO 40 x 40 cm m2 220,000.00
7 Marmer m2 475,000.00
V.BAHAN BESI
1 BESI BETON besi beton polos kg 9,500.00
besi beton prestress kg 13,000.00
besi beton ulir kg 12,500.00
VI . B A H A N P I P A
1 Pipa PVC SII SCJ , S - 12,5 (10 bar)
Pipa PVC DN 40 ( 1½" ) btg 56,000.00
Pipa PVC DN 90 ( 3" ) btg 125,000.00
Pipa PVC DN 110 ( 4" ) btg 180,000.00
VIII . B A H A N F I N I S H I N G
1 KAYU
Dempul plamur kg 16,000.00
Ambril/amplas lbr 3,000.00
Cat dasar kg 35,000.00
- Koas bh 7,500.00
. Plitur jadi ltr 61,000.00
2 TEMBOK
Plamur kg 16,000.00
Cat Tembok kg 23,000.00
3 BESI
Menie kg 20,000.00
Cat mengkilat kg 55,000.00
IX . B A H A N K A C A
1 Kaca Cermin m² 225,000.00
2 Kaca Buram m² 230,000.00
3 Kaca Clear m² 220,000.00
4 kaca acrylic t=8 mm m² 620,000.00
2 SKAKELAR
5 STOP KONTAK
Stop kontak 16A.200W.1PH buah 25,000.00
Stop kontak 16A.200W.2PH buah 40,000.00
7 LAIN-LAIN
Indoor Unit Ac, Wall Mounted Type 1 PK buah 3,550,000.00
4 LAIN - LAIN
Kran Air bh 25,000.00
Seal tape bh 2,000.00
Floor drain bh 25,000.00
X IV . PAVING BLOCK
1 SQUARE Merah/hitam m2 85,000.00
XV. L A I N - L A I N
1 Kusen Almunium 4" Putih m' 80,000.00
2 Allumunium Strip m' 4,500.00
LAIN-LAIN
Minyak Beton & bekisting ltr 9,000.00
2 Aluminium Composite Panel ACP 4 mm m2 750,000.00
Kaca Tempered t=8 mm m2 225,000.00
Aluminum L 2,5 cm t=1.2 mm m' 29,000.00
Air m3 15,000.00
sealant tube 55,000.00
Solar (Industri) ltr 7,000.00
Pintu UPVC unit 345,000.00
Pelumas ltr 37,500.00
NG & SEKITAR
EDISI III 2018
HARGA
MAKSIMUM YANG DIPAKAI KET
(Rp) (Rp)
335,000.00 297,500.00
400,000.00 350,000.00
650.00 625.00
230,000.00 195,000.00
370,000.00 340,000.00
380,000.00 365,000.00
150,000.00 135,000.00
53,500.00 53,000.00
54,000.00 53,000.00
95,000.00 92,500.00
15,000.00 13,000.00
14,000.00
1,962.50
4,625.00
19,200.00
5,350.00 5,225.00
9,200.00 9,100.00
60,000.00 59,500.00
72,000.00 70,500.00
7,800,000.00 7,500,000.00
7,500,000.00 6,800,000.00
8,800,000.00 7,525,000.00
6,000,000.00 5,525,500.00
5,700,000.00 5,250,000.00
5,400,000.00 4,950,000.00
24,000.00 22,500.00
21,000.00 19,500.00
55,000.00 50,000.00
56,000.00 46,500.00
56,000.00 51,250.00
60,000.00 55,000.00
310,000.00 260,000.00
115,000.00 112,500.00
250,000.00 235,000.00
480,000.00 477,500.00
10,500.00 10,000.00
14,500.00 13,750.00
13,000.00 12,750.00
14,000.00 13,500.00
14,500.00 14,000.00
20,000.00 19,000.00
115,500.00 106,250.00
130,000.00 126,700.00
6,500.00
68,000.00 64,000.00
80,000.00 72,500.00
125,000.00 110,000.00
90,000.00 87,500.00
30,000.00 23,000.00
4,100.00 3,550.00
40,000.00 37,500.00
8,000.00 7,750.00
65,000.00 63,000.00
32,000.00 24,000.00
26,000.00 24,500.00
36,000.00 28,000.00
58,000.00 56,500.00
275,000.00 250,000.00
255,000.00 242,500.00
230,000.00 225,000.00
650,000.00 635,000.00
5,000.00 4,600.00
11,500.00 11,200.00
43,000.00 42,000.00
25,000.00 23,250.00
31,000.00 29,500.00
31,000.00 28,000.00
60,000.00 50,000.00
165,000.00 152,500.00
159,000.00 129,500.00
73,000.00 71,500.00
48,000.00 47,500.00
195,000.00 180,000.00
3,775,000.00 3,662,500.00
600.00 550.00
600.00 550.00
60.00 55.00
135,000.00 130,000.00
4,200.00 4,100.00
175,000.00 170,000.00
85,000.00 74,500.00
25,000.00 20,000.00
9,000.00 7,500.00
17,500.00 16,250.00
1,850,000.00 1,575,000.00
950,000.00 825,000.00
45,000.00 35,000.00
4,000.00 3,000.00
35,000.00 30,000.00
17,500.00 16,250.00
8,000.00 7,000.00
20,000.00 16,250.00
5,500.00 5,250.00
90,000.00 87,500.00
85,000.00 82,500.00
5,000.00 4,750.00
10,000.00 9,500.00
800,000.00 775,000.00
230,000.00 227,500.00
32,000.00 30,500.00
20,000.00 17,500.00
65,000.00 60,000.00
7,200.00 7,100.00
365,000.00 355,000.00
45,000.00 41,250.00
I. PEKERJAAN PERSIAPAN
1 1 m² Pembersihan Lapangan
Upah
0.1000 OH Pekerja
0.0500 OH Mandor
Upah
0.1000 OH Tukang Kayu
0.1000 OH Pekerja
0.0100 OH Kepala Tukang Kayu
0.0050 OH Mandor
Upah
2.0000 OH Tukang Kayu
1.0000 OH Pekerja
0.2000 OH Kepala Tukang
0.0500 OH Mandor
Upah
0.2000 OH Tukang Kayu
0.4000 OH Pekerja
0.0200 OH Kepala Tukang
0.0200 OH Mandor
Upah
0.3200 OH Pekerja
1.0000 OH Mandor
Upah
0.25 OH Pekerja
0.025 OH Mandor
4 1 m³ Urugan pasir
Bahan
1.2 m3 Pasir Urug
Upah
0.3 OH Pekerja
0.01 OH Mandor
Upah
0.5 OH Pekerja
0.05 OH Mandor
1 1 m³ Membuat Lantai Kerja Beton mutu f'c=7,4 MPa (K100), slum (3-6)cm, w/c = 0,87
Bahan
230.00 Kg Portland Semen
893.00 Kg Pasir beton
1,027.00 Kg Kerikil (maksimum 30 mm)
200.00 Ltr Air
Upah
1.200 OH Pekerja
0.200 OH Tukang Batu
0.020 OH Kepala Tukang
0.006 OH Mandor
2 1 m³ Membuat beton mutu fc = 19.3 Mpa (K225). slum (12+2) cm. w/c = 0.58
Bahan
371.00 Kg Portland Semen
698.00 Kg Pasir beton
1,047.00 Kg Kerikil (maksimum 30 mm)
215.00 Ltr Air
Upah
1.650 OH Pekerja
0.275 OH Tukang Batu
0.028 OH Kepala Tukang
0.083 OH Mandor
3 1 m³ Membuat beton mutu fc = 21.7 Mpa (K250). slum (12+2) cm. w/c = 0.56
Bahan
384.00 Kg Portland Semen
692.00 Kg Pasir beton
1,039.00 Kg Kerikil (maksimum 30 mm)
215.00 Ltr Air
Upah
1.650 OH Pekerja
0.275 OH Tukang Batu
0.028 OH Kepala Tukang
0.083 OH Mandor
Upah
0.070 OH Pekerja
0.070 OH Tukang Besi
0.007 OH Kepala Tukang
0.004 OH Mandor
Upah
0.520 OH Pekerja
0.260 OH Tukang Kayu
0.026 OH Kepala Tukang
0.026 OH Mandor
Upah
0.520 OH Pekerja
0.260 OH Tukang Kayu
0.026 OH Kepala Tukang
0.026 OH Mandor
Upah
0.660 OH Pekerja
0.330 OH Tukang Kayu
0.033 OH Kepala Tukang
0.033 OH Mandor
Upah
0.660 OH Pekerja
0.330 OH Tukang Kayu
0.033 OH Kepala Tukang
0.033 OH Mandor
Upah
0.660 OH Pekerja
0.330 OH Tukang Kayu
0.033 OH Kepala Tukang
0.033 OH Mandor
Upah
0.660 OH Pekerja
0.330 OH Tukang Kayu
0.033 OH Kepala Tukang
0.033 OH Mandor
Upah
0.06 OH Pekerja
0.06 OH Tukang Besi
0.006 OH Kepala Tukang
0.003 OH Mandor
Upah
0.1 OH Pekerja
0.1 OH Tukang Besi
0.001 OH Kepala Tukang
0.005 OH Mandor
Upah
1.5 OH Pekerja
0.75 OH Tukang Batu
0.075 OH KepalaTukang
0.075 OH Mandor
Upah
0.780 OH Pekerja
0.390 OH Tukang Batu
0.039 OH Kepala Tukang Batu
0.039 OH Mandor
3 1 m² Memasang Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1/2 Bata Camp. 1Pc : 5PP
Bahan
70 Buah Bata Merah 5 x 11 x 22
9.68 Kg Portland Semen
0.045 m3 Pasir Pasang
Upah
0.3 OH Pekerja
0.1 OH Tukang Batu
0.01 OH Kepala Tukang
0.015 OH Mandor
4 1 m² Memasang Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1/2 Bata Camp. 1Pe : 3PP
Bahan
70 Buah Bata Merah 5 x 11 x 22
14.37 Kg Portland Semen
0.04 m3 Pasir Pasang
Upah
0.3 OH Pekerja
0.1 OH Tukang Batu
0.01 OH Kepala Tukang
0.015 OH Mandor
Upah
0.3 OH Pekerja
0.15 OH Tukang batu
0.015 OH Kepala Tukang
0.015 OH Mandor
Upah
0.3 OH Pekerja
0.15 OH Tukang batu
0.015 OH Kepala Tukang
0.015 OH Mandor
7 1 m² Memasang Acian
Bahan
3.25 Kg Portland Semen
Upah
0.2 OH Pekerja
0.1 OH Tukang batu
0.01 OH Kepala Tukang
0.01 OH Mandor
Upah
0.250 OH Pekerja
0.125 OH Tukang Batu
0.013 OH Kepala Tukang
0.013 OH Mandor
Upah
0.700 OH Pekerja
0.350 OH Tukang Batu
0.035 OH Kepala Tukang
0.035 OH Mandor
Upah
0.467 OH Pekerja
0.233 OH Tukang Batu
0.023 OH Kepala Tukang
0.023 OH Mandor
Upah
0.700 OH Pekerja
0.350 OH Tukang Batu
0.035 OH Kepala Tukang
0.035 OH Mandor
Upah
0.250 OH Pekerja
0.125 OH Tukang Batu
0.013 OH Kepala Tukang
0.013 OH Mandor
Upah
0.900 OH Pekerja
0.450 OH Tukang Batu
0.045 OH Kepala Tukang
0.045 OH Mandor
Upah
1.300 OH Pekerja
0.650 OH Tukang Batu
0.065 OH Kepala Tukang
0.065 OH Mandor
Upah
1.300 OH Pekerja
0.650 OH Tukang Batu
0.065 OH Kepala Tukang
0.065 OH Mandor
Upah
2.400 OH Pekerja
7.200 OH Tukang Kayu
0.720 OH Kepala Tukang
0.120 OH Mandor
0.560 kg compon
3.600 m' Metalfuring
0.220 Kg Paku Sekrup
Upah
0.300 OH Pekerja
0.300 OH Tukang Kayu
0.015 OH Kepala Tukang
0.015 OH Mandor
Upah
0.030 OH Pekerja
0.030 OH Tukang kayu
0.003 OH Kepala Tukang
0.003 OH Mandor
Upah
0.100 OH Pekerja
0.200 OH Tukang Kayu
0.020 OH Kepala Tukang
0.005 OH Mandor
Upah
0.20 OH Pekerja
0.15 OH Tukang batu
0.015 OH Kepala Tukang batu
0.008 OH Mandor
Upah
1.00 OH Pekerja
0.50 OH Tukang besi
0.04 OH Kepala Tukang
0.15 OH Mandor
Upah
0.50 OH Pekerja
0.01 OH Mandor
Upah
0.50 OH Pekerja
0.01 OH Mandor
Upah
0.48 OH Pekerja
0.64 OH Tukang Kayu
0.048 OH Kepala Tukang
0.016 OH Mandor
Upah
0.043 OH Pekerja
0.043 OH Tukang Besi
0.0043 OH Kepala Tukang
0.0021 OH Mandor
Upah
0.085 OH Pekerja
Upah
0.085 OH Pekerja
0.085 OH Tukang Besi
0.0085 OH Kepala Tukang
0.0042 OH Mandor
Upah
0.600 OH Pekerja
2.000 OH Tukang Kayu
0.200 OH Kepala tukang
0.030 OH Mandor
Upah
0.15 OH Pekerja
0.15 OH Tukang Kayu
0.015 OH Kepala Tukang
0.008 OH Mandor
Upah
0.15 OH Pekerja
0.15 OH Tukang Kayu
0.015 OH Kepala Tukang
0.008 OH Mandor
Upah
0.015 OH Pekerja
0.15 OH Tukang Kayu
0.015 OH Kepala Tukang
0.00075 OH Mandor
Upah
0.015 OH Pekerja
0.150 OH Tukang Kayu
0.015 OH Kepala Tukang
0.008 OH Mandor
Upah
0.010 OH Pekerja
0.500 OH Tukang Kayu
0.010 OH Kepala Tukang
0.005 OH Mandor
Upah
0.005 OH Pekerja
0.500 OH Tukang Kayu
0.005 OH Kepala Tukang
0.003 OH Mandor
36 1 m² Pengecat Tembok Baru (1lap.Plamir, 1 lap Cat Dasar,2 lap, cat penutup ) eksterior
Bahan
0.1 Kg Plamir
0.1 Kg Cat Dasar
0.28 Kg Cat Penutup 2 kali
Upah
0.02 OH Pekerja
0.063 OH Tukang Cat
0.0063 OH Kepala Tukang
0.0025 OH Mandor
37 1 m² Pengecat Tembok Baru (1lap.Plamir, 1 lap Cat Dasar, 2 lap, cat penutup ) Interior
Bahan
0.1 Kg Plamir
0.1 Kg Cat Dasar
0.28 Kg Cat Penutup 2 kali
Upah
0.02 OH Pekerja
0.063 OH Tukang Cat
0.0063 OH Kepala Tukang
0.0025 OH Mandor
Upah
0.2 OH Pekerja
0.3 OH Tukang Cat
0.02 OH Kepala Tukang
0.0025 OH Mandor
39 1 m² Pengecat Plafond Baru (1 lap Cat Dasar, 2 lap cat penutup) interior
Bahan
0.1 Kg Cat Dasar
0.28 Kg Cat Penutup 2 kali
0.02 Bh Kuwas/roll
0.25 Lbr Amplas
Upah
0.02 OH Pekerja
0.063 OH Tukang Cat
0.0063 OH Kepala Tukang
0.0025 OH Mandor
Upah
0.150 OH Pekerja
0.075 OH Tukang Kayu
0.008 OH Kepala Tukang
0.008 OH Mandor
Upah
0.400 OH Pekerja
0.200 OH Tukang Kayu
0.020 OH Kepala Tukang
0.002 OH Mandor
Upah
0.03 OH Pekerja
0.3 OH Tukang Ledeng
0.03 OH Kepala Tukang
0.0015 OH Mandor
Upah
3.3 OH Pekerja
1.1 OH Tukang Batu
0.001 OH Kepala Tukang
0.16 OH Mandor
Upah
1.200 OH Pekerja
0.145 OH Tukang Batu
0.150 OH Kepala Tukang
0.100 OH Mandor
Upah
0.010 OH Pekerja
0.100 OH Tukang Batu
0.010 OH Kepala Tukang
0.005 OH Mandor
Upah
0.010 OH Pekerja
0.400 OH Tukang Batu
Upah
0.075 OH Pekerja
0.75 OH Tukang Batu
0.075 OH Kepala Tukang
0.003 OH Mandor
Upah
0.075 OH Pekerja
0.75 OH Tukang Batu
0.075 OH Kepala Tukang
0.003 OH Mandor
Upah
0.036 OH Pekerja
0.060 OH Tukang Batu
0.006 OH Kepala Tukang
0.002 OH Mandor
Upah
0.081 OH Pekerja
0.135 OH Tukang Batu
0.0135 OH Kepala Tukang
0.004 OH Mandor
Upah
0.036 OH Pekerja
0.06 OH Tukang Batu
0.006 OH Kepala Tukang
0.002 OH Mandor
Upah
2.1 OH Tukang Listrik
0.035 OH Mandor
Upah
2.1 OH Tukang Listrik
0.035 OH Mandor
Upah
2.1 OH Tukang Listrik
0.035 OH Mandor
Upah
2.1 OH Tukang Listrik
0.035 OH Mandor
Upah
2.1 OH Tukang Listrik
0.035 OH Mandor
Upah
2.1 OH Tukang Listrik
0.035 OH Mandor
Upah
2.1 OH Tukang Listrik
0.035 OH Mandor
Upah
2.1 OH Tukang Listrik
0.035 OH Mandor
Upah
2.1 OH Tukang Listrik
0.035 OH Mandor
Upah
2.1 OH Tukang Listrik
0.035 OH Mandor
Upah
2.1 OH Tukang Listrik
0.035 OH Mandor
Upah
0.678 OH Tukang Listrik
0.035 OH Mandor
Upah
2.1 OH Tukang Listrik
0.035 OH Mandor
Rp 13,250.00
Rp 80,000.00 Rp 8,000.00
Rp 105,000.00 Rp 5,250.00
Rp 138,981.00
Rp 5,525,500.00 Rp 66,306.00
Rp 16,250.00 Rp 325.00
Rp 7,525,000.00 Rp 52,675.00
Rp 100,000.00 Rp 10,000.00
Rp 80,000.00 Rp 8,000.00
Rp 115,000.00 Rp 1,150.00
Rp 105,000.00 Rp 525.00
Rp 999,955.00
Rp 22,500.00 Rp 38,250.00
Rp 4,950,000.00 Rp 519,750.00
Rp 16,250.00 Rp 4,875.00
Rp 1,060.00 Rp 11,130.00
Rp 365,000.00 Rp 10,950.00
Rp 350,000.00 Rp 17,500.00
Rp 59,500.00 Rp 89,250.00
Rp 100,000.00 Rp 200,000.00
Rp 80,000.00 Rp 80,000.00
Rp 115,000.00 Rp 23,000.00
Rp 105,000.00 Rp 5,250.00
Rp 355,325.00
Rp 22,500.00 Rp 28,125.00
Rp 1,060.00 Rp 2,650.00
Rp 59,500.00 Rp 71,400.00
Rp 365,000.00 Rp 1,825.00
Rp 350,000.00 Rp 3,150.00
Rp 4,950,000.00 Rp 178,200.00
Rp 16,250.00 Rp 975.00
Rp 28,000.00 Rp 12,600.00
Rp 100,000.00 Rp 20,000.00
Rp 80,000.00 Rp 32,000.00
Rp 115,000.00 Rp 2,300.00
Rp 105,000.00 Rp 2,100.00
Rp 273,487.50
Rp 19,500.00 Rp 24,375.00
Rp 16,250.00 Rp 812.50
Rp 72,500.00 Rp 72,500.00
Rp 56,500.00 Rp 45,200.00
Rp 80,000.00 Rp 25,600.00
Rp 105,000.00 Rp 105,000.00
Rp 62,625.00
Rp 80,000.00 Rp 60,000.00
Rp 105,000.00 Rp 2,625.00
Rp 76,725.00
Rp 80,000.00 Rp 72,000.00
Rp 105,000.00 Rp 4,725.00
Rp 184,625.00
Rp 135,000.00 Rp 162,000.00
Rp 80,000.00 Rp 20,000.00
Rp 105,000.00 Rp 2,625.00
Rp 259,050.00
Rp 195,000.00 Rp 234,000.00
Rp 80,000.00 Rp 24,000.00
Rp 105,000.00 Rp 1,050.00
Rp 45,250.00
Rp 80,000.00 Rp 40,000.00
Rp 105,000.00 Rp 5,250.00
Rp 875,547.86
Rp 1,060.00 Rp 243,800.00
Rp 260.71 Rp 232,817.86
Rp 269.23 Rp 276,500.00
Rp 17.50 Rp 3,500.00
Rp 80,000.00 Rp 96,000.00
Rp 100,000.00 Rp 20,000.00
Rp 115,000.00 Rp 2,300.00
Rp 105,000.00 Rp 630.00
Rp 1,032,320.69
Rp 1,060.00 Rp 393,260.00
Rp 260.71 Rp 181,978.57
Rp 269.23 Rp 281,884.62
Rp 17.50 Rp 3,762.50
Rp 80,000.00 Rp 132,000.00
Rp 100,000.00 Rp 27,500.00
Rp 115,000.00 Rp 3,220.00
Rp 105,000.00 Rp 8,715.00
Rp 1,042,382.55
Rp 1,060.00 Rp 407,040.00
Rp 260.71 Rp 180,414.29
Rp 269.23 Rp 279,730.77
Rp 17.50 Rp 3,762.50
Rp 80,000.00 Rp 132,000.00
Rp 100,000.00 Rp 27,500.00
Rp 115,000.00 Rp 3,220.00
Rp 105,000.00 Rp 8,715.00
Rp 150,550.00
Rp 12,750.00 Rp 133,875.00
Rp 19,000.00 Rp 2,850.00
Rp 80,000.00 Rp 5,600.00
Rp 100,000.00 Rp 7,000.00
Rp 115,000.00 Rp 805.00
Rp 105,000.00 Rp 420.00
Rp 184,145.00
Rp 5,250,000.00 Rp 105,000.00
Rp 16,250.00 Rp 4,875.00
Rp 9,500.00 Rp 950.00
Rp 80,000.00 Rp 41,600.00
Rp 100,000.00 Rp 26,000.00
Rp 115,000.00 Rp 2,990.00
Rp 105,000.00 Rp 2,730.00
Rp 197,270.00
Rp 5,250,000.00 Rp 118,125.00
Rp 16,250.00 Rp 4,875.00
Rp 9,500.00 Rp 950.00
Rp 80,000.00 Rp 41,600.00
Rp 100,000.00 Rp 26,000.00
Rp 115,000.00 Rp 2,990.00
Rp 105,000.00 Rp 2,730.00
Rp 289,651.25
Rp 5,250,000.00 Rp 105,000.00
Rp 16,250.00 Rp 6,500.00
Rp 9,500.00 Rp 1,900.00
Rp 5,525,500.00 Rp 41,441.25
Rp 110,000.00 Rp 19,250.00
Rp 22,500.00 Rp 22,500.00
Rp 80,000.00 Rp 52,800.00
Rp 100,000.00 Rp 33,000.00
Rp 115,000.00 Rp 3,795.00
Rp 105,000.00 Rp 3,465.00
Rp 297,939.50
Rp 5,250,000.00 Rp 105,000.00
Rp 16,250.00 Rp 6,500.00
Rp 9,500.00 Rp 1,900.00
Rp 5,525,500.00 Rp 49,729.50
Rp 110,000.00 Rp 19,250.00
Rp 22,500.00 Rp 22,500.00
Rp 80,000.00 Rp 52,800.00
Rp 100,000.00 Rp 33,000.00
Rp 115,000.00 Rp 3,795.00
Rp 105,000.00 Rp 3,465.00
Rp 334,651.25
Rp 5,250,000.00 Rp 105,000.00
Rp 16,250.00 Rp 6,500.00
Rp 9,500.00 Rp 1,900.00
Rp 5,525,500.00 Rp 41,441.25
Rp 110,000.00 Rp 19,250.00
Rp 22,500.00 Rp 67,500.00
Rp 80,000.00 Rp 52,800.00
Rp 100,000.00 Rp 33,000.00
Rp 115,000.00 Rp 3,795.00
Rp 105,000.00 Rp 3,465.00
Rp 262,926.25
Rp 5,250,000.00 Rp 78,750.00
Rp 16,250.00 Rp 6,500.00
Rp 9,500.00 Rp 1,425.00
Rp 5,525,500.00 Rp 41,441.25
Rp 110,000.00 Rp 19,250.00
Rp 22,500.00 Rp 22,500.00
Rp 80,000.00 Rp 52,800.00
Rp 100,000.00 Rp 33,000.00
Rp 115,000.00 Rp 3,795.00
Rp 105,000.00 Rp 3,465.00
Rp 29,585.00
Rp 14,000.00 Rp 16,100.00
Rp 28,000.00 Rp 1,680.00
Rp 80,000.00 Rp 4,800.00
Rp 100,000.00 Rp 6,000.00
Rp 115,000.00 Rp 690.00
Rp 105,000.00 Rp 315.00
Rp 29,865.00
Rp 7,100.00 Rp 7,100.00
Rp 41,250.00 Rp 4,125.00
Rp 80,000.00 Rp 8,000.00
Rp 100,000.00 Rp 10,000.00
Rp 115,000.00 Rp 115.00
Rp 105,000.00 Rp 525.00
Rp 897,620.00
Rp 297,500.00 Rp 357,000.00
Rp 1,060.00 Rp 144,160.00
Rp 340,000.00 Rp 184,960.00
Rp 80,000.00 Rp 120,000.00
Rp 100,000.00 Rp 75,000.00
Rp 115,000.00 Rp 8,625.00
Rp 105,000.00 Rp 7,875.00
Rp 551,220.00
Rp 297,500.00 Rp 357,000.00
Rp 195,000.00 Rp 84,240.00
Rp 80,000.00 Rp 62,400.00
Rp 100,000.00 Rp 39,000.00
Rp 115,000.00 Rp 4,485.00
Rp 105,000.00 Rp 4,095.00
Rp 625.00 Rp 43,750.00
Rp 1,060.00 Rp 10,260.80
Rp 340,000.00 Rp 15,300.00
Rp 80,000.00 Rp 24,000.00
Rp 100,000.00 Rp 10,000.00
Rp 115,000.00 Rp 1,150.00
Rp 105,000.00 Rp 1,575.00
Rp 625.00 Rp 43,750.00
Rp 1,060.00 Rp 15,232.20
Rp 340,000.00 Rp 13,600.00
Rp 80,000.00 Rp 24,000.00
Rp 100,000.00 Rp 10,000.00
Rp 115,000.00 Rp 1,150.00
Rp 105,000.00 Rp 1,575.00
Rp 58,362.56
Rp 1,060.00 Rp 8,242.56
Rp 340,000.00 Rp 7,820.00
Rp 80,000.00 Rp 24,000.00
Rp 100,000.00 Rp 15,000.00
Rp 115,000.00 Rp 1,725.00
Rp 105,000.00 Rp 1,575.00
Rp 57,074.40
Rp 1,060.00 Rp 6,614.40
Rp 340,000.00 Rp 8,160.00
Rp 80,000.00 Rp 24,000.00
Rp 100,000.00 Rp 15,000.00
Rp 115,000.00 Rp 1,725.00
Rp 105,000.00 Rp 1,575.00
Rp 31,645.00
Rp 1,060.00 Rp 3,445.00
Rp 80,000.00 Rp 16,000.00
Rp 100,000.00 Rp 10,000.00
Rp 115,000.00 Rp 1,150.00
Rp 105,000.00 Rp 1,050.00
Rp 324,698.00
Rp 235,000.00 Rp 246,750.00
Rp 1,060.00 Rp 10,388.00
Rp 340,000.00 Rp 15,300.00
Rp 13,000.00 Rp 16,900.00
Rp 80,000.00 Rp 20,000.00
Rp 100,000.00 Rp 12,500.00
Rp 115,000.00 Rp 1,495.00
Rp 105,000.00 Rp 1,365.00
Rp 192,925.00
Rp 46,500.00 Rp 48,825.00
Rp 1,060.00 Rp 10,600.00
Rp 340,000.00 Rp 15,300.00
Rp 13,000.00 Rp 19,500.00
Rp 80,000.00 Rp 56,000.00
Rp 100,000.00 Rp 35,000.00
Rp 115,000.00 Rp 4,025.00
Rp 105,000.00 Rp 3,675.00
Rp 220,524.78
Rp 51,250.00 Rp 53,812.50
Rp 19,200.00 Rp 96,000.00
Rp 14,000.00 Rp 4,912.28
Rp 80,000.00 Rp 37,333.33
Rp 100,000.00 Rp 23,333.33
Rp 115,000.00 Rp 2,683.33
Rp 105,000.00 Rp 2,450.00
Rp 381,450.00
Rp 260,000.00 Rp 273,000.00
Rp 16,250.00 Rp 9,750.00
Rp 80,000.00 Rp 56,000.00
Rp 100,000.00 Rp 35,000.00
Rp 115,000.00 Rp 4,025.00
Rp 105,000.00 Rp 3,675.00
Rp 168,230.61
Rp 50,000.00 Rp 52,500.00
Rp 1,962.50 Rp 52,333.33
Rp 4,625.00 Rp 23,125.00
Rp 14,000.00 Rp 4,912.28
Rp 80,000.00 Rp 20,000.00
Rp 100,000.00 Rp 12,500.00
Rp 115,000.00 Rp 1,495.00
Rp 105,000.00 Rp 1,365.00
Rp 294,230.00
Rp 55,000.00 Rp 57,750.00
Rp 19,200.00 Rp 96,000.00
Rp 14,000.00 Rp 13,580.00
Rp 80,000.00 Rp 72,000.00
Rp 100,000.00 Rp 45,000.00
Rp 115,000.00 Rp 5,175.00
Rp 105,000.00 Rp 4,725.00
Rp 331,405.00
Rp 112,500.00 Rp 123,750.00
Rp 1,060.00 Rp 12,455.00
Rp 340,000.00 Rp 11,900.00
Rp 80,000.00 Rp 104,000.00
Rp 100,000.00 Rp 65,000.00
Rp 115,000.00 Rp 7,475.00
Rp 105,000.00 Rp 6,825.00
Rp 768,336.40
Rp 477,500.00 Rp 506,150.00
Rp 16,250.00 Rp 48,750.00
Rp 1,060.00 Rp 13,186.40
Rp 340,000.00 Rp 8,500.00
Rp 13,000.00 Rp 8,450.00
Rp 80,000.00 Rp 104,000.00
Rp 100,000.00 Rp 65,000.00
Rp 115,000.00 Rp 7,475.00
Rp 105,000.00 Rp 6,825.00
Rp 8,738,650.00
Rp 6,800,000.00 Rp 7,480,000.00
Rp 13,500.00 Rp 202,500.00
Rp 16,250.00 Rp 48,750.00
Rp 80,000.00 Rp 192,000.00
Rp 100,000.00 Rp 720,000.00
Rp 115,000.00 Rp 82,800.00
Rp 105,000.00 Rp 12,600.00
Rp 150,672.00
Rp 64,000.00 Rp 23,296.00
Rp 10,000.00 Rp 1,500.00
Rp 1,850.00 Rp 1,036.00
Rp 18,333.33 Rp 66,000.00
Rp 7,000.00 Rp 1,540.00
Rp 80,000.00 Rp 24,000.00
Rp 100,000.00 Rp 30,000.00
Rp 115,000.00 Rp 1,725.00
Rp 105,000.00 Rp 1,575.00
Rp 12,977.50
Rp 6,500.00 Rp 6,825.00
Rp 1,850.00 Rp 92.50
Rp 80,000.00 Rp 2,400.00
Rp 100,000.00 Rp 3,000.00
Rp 115,000.00 Rp 345.00
Rp 105,000.00 Rp 315.00
Rp 114,137.50
Rp 7,500,000.00 Rp 82,500.00
Rp 16,250.00 Rp 812.50
Rp 80,000.00 Rp 8,000.00
Rp 100,000.00 Rp 20,000.00
Rp 115,000.00 Rp 2,300.00
Rp 105,000.00 Rp 525.00
Rp 142,340.00
Rp 87,500.00 Rp 88,375.00
Rp 340,000.00 Rp 20,400.00
Rp 80,000.00 Rp 16,000.00
Rp 100,000.00 Rp 15,000.00
Rp 115,000.00 Rp 1,725.00
Rp 105,000.00 Rp 840.00
Rp 1,177,350.00
Rp 775,000.00 Rp 852,500.00
Rp 40,000.00 Rp 128,000.00
Rp 30,500.00 Rp 30,500.00
Rp 60,000.00 Rp 9,000.00
Rp 7,000.00 Rp 7,000.00
Rp 80,000.00 Rp 80,000.00
Rp 100,000.00 Rp 50,000.00
Rp 115,000.00 Rp 4,600.00
Rp 105,000.00 Rp 15,750.00
Rp 1,430,025.00
Rp 106,250.00 Rp 127,500.00
Rp 126,700.00 Rp 506,800.00
Rp 27,500.00 Rp 27,500.00
Rp 635,000.00 Rp 647,700.00
Rp 35,000.00 Rp 35,000.00
Rp 45,000.00 Rp 45,000.00
Rp 80,000.00 Rp 40,000.00
Rp 105,000.00 Rp 525.00
Rp 633,450.00
Rp 26,000.00 Rp 27,300.00
Rp 87,500.00 Rp 367,500.00
Rp 112,500.00 Rp 118,125.00
Rp 45,000.00 Rp 45,000.00
Rp 35,000.00 Rp 35,000.00
Rp 80,000.00 Rp 40,000.00
Rp 105,000.00 Rp 525.00
Rp 397,100.00
Rp 227,500.00 Rp 227,500.00
Rp 60,000.00 Rp 60,000.00
Rp 80,000.00 Rp 38,400.00
Rp 100,000.00 Rp 64,000.00
Rp 115,000.00 Rp 5,520.00
Rp 105,000.00 Rp 1,680.00
Rp 113,305.00
Rp 82,500.00 Rp 90,750.00
Rp 5,250.00 Rp 10,500.00
Rp 60,000.00 Rp 3,600.00
Rp 80,000.00 Rp 3,440.00
Rp 100,000.00 Rp 4,300.00
Rp 115,000.00 Rp 494.50
Rp 105,000.00 Rp 220.50
Rp 449,068.50
Rp 82,500.00 Rp 363,000.00
Rp 4,750.00 Rp 69,350.00
Rp 80,000.00 Rp 6,800.00
Rp 100,000.00 Rp 8,500.00
Rp 115,000.00 Rp 977.50
Rp 105,000.00 Rp 441.00
Rp 449,068.50
Rp 82,500.00 Rp 363,000.00
Rp 4,750.00 Rp 69,350.00
Rp 80,000.00 Rp 6,800.00
Rp 100,000.00 Rp 8,500.00
Rp 115,000.00 Rp 977.50
Rp 105,000.00 Rp 441.00
Rp 1,571,512.50
Rp 82,500.00 Rp 1,204,500.00
Rp 16,250.00 Rp 487.50
Rp 16,250.00 Rp 4,875.00
Rp 87,500.00 Rp 87,500.00
Rp 80,000.00 Rp 48,000.00
Rp 100,000.00 Rp 200,000.00
Rp 115,000.00 Rp 23,000.00
Rp 105,000.00 Rp 3,150.00
Rp 277,012.50
Rp 225,000.00 Rp 247,500.00
Rp 80,000.00 Rp 12,000.00
Rp 100,000.00 Rp 15,000.00
Rp 115,000.00 Rp 1,725.00
Rp 105,000.00 Rp 787.50
Rp 296,262.50
Rp 242,500.00 Rp 266,750.00
Rp 80,000.00 Rp 12,000.00
Rp 100,000.00 Rp 15,000.00
Rp 115,000.00 Rp 1,725.00
Rp 105,000.00 Rp 787.50
Rp 293,003.75
Rp 250,000.00 Rp 275,000.00
Rp 80,000.00 Rp 1,200.00
Rp 100,000.00 Rp 15,000.00
Rp 115,000.00 Rp 1,725.00
Rp 105,000.00 Rp 78.75
Rp 26,212.50
Rp 7,500.00 Rp 7,500.00
Rp 80,000.00 Rp 1,200.00
Rp 100,000.00 Rp 15,000.00
Rp 115,000.00 Rp 1,725.00
Rp 105,000.00 Rp 787.50
Rp 48,725.00
Rp 20,000.00 Rp 20,000.00
Rp 16,250.00 Rp 16,250.00
Rp 80,000.00 Rp 800.00
Rp 100,000.00 Rp 10,000.00
Rp 115,000.00 Rp 1,150.00
Rp 105,000.00 Rp 525.00
Rp 222,475.00
Rp 170,000.00 Rp 170,000.00
Rp 80,000.00 Rp 800.00
Rp 100,000.00 Rp 50,000.00
Rp 115,000.00 Rp 1,150.00
Rp 105,000.00 Rp 525.00
Rp 51,237.50
Rp 74,500.00 Rp 74,500.00
Rp 80,000.00 Rp 400.00
Rp 100,000.00 Rp 50,000.00
Rp 115,000.00 Rp 575.00
Rp 105,000.00 Rp 262.50
Rp 21,897.00
Rp 24,000.00 Rp 2,400.00
Rp 37,500.00 Rp 3,750.00
Rp 24,500.00 Rp 6,860.00
Rp 80,000.00 Rp 1,600.00
Rp 100,000.00 Rp 6,300.00
Rp 115,000.00 Rp 724.50
Rp 105,000.00 Rp 262.50
Rp 21,897.00
Rp 24,000.00 Rp 2,400.00
Rp 37,500.00 Rp 3,750.00
Rp 24,500.00 Rp 6,860.00
Rp 80,000.00 Rp 1,600.00
Rp 100,000.00 Rp 6,300.00
Rp 115,000.00 Rp 724.50
Rp 105,000.00 Rp 262.50
Rp 113,145.00
Rp 63,000.00 Rp 63,000.00
Rp 23,000.00 Rp 1,150.00
Rp 3,550.00 Rp 355.00
Rp 7,750.00 Rp 77.50
Rp 80,000.00 Rp 16,000.00
Rp 100,000.00 Rp 30,000.00
Rp 115,000.00 Rp 2,300.00
Rp 105,000.00 Rp 262.50
Rp 20,539.50
Rp 37,500.00 Rp 3,750.00
Rp 24,500.00 Rp 6,860.00
Rp 7,750.00 Rp 155.00
Rp 3,550.00 Rp 887.50
Rp 80,000.00 Rp 1,600.00
Rp 100,000.00 Rp 6,300.00
Rp 115,000.00 Rp 724.50
Rp 105,000.00 Rp 262.50
Rp 115,310.00
Rp 5,225.00 Rp 94,050.00
Rp 80,000.00 Rp 12,000.00
Rp 100,000.00 Rp 7,500.00
Rp 115,000.00 Rp 920.00
Rp 105,000.00 Rp 840.00
Rp 119,870.00
Rp 9,200.00 Rp 46,000.00
Rp 1,060.00 Rp 8,480.00
Rp 340,000.00 Rp 10,880.00
Rp 80,000.00 Rp 32,000.00
Rp 100,000.00 Rp 20,000.00
Rp 115,000.00 Rp 2,300.00
Rp 105,000.00 Rp 210.00
Rp 229,507.50
Rp 155,000.00 Rp 155,000.00
Rp 38,500.00 Rp 38,500.00
Rp 80,000.00 Rp 2,400.00
Rp 100,000.00 Rp 30,000.00
Rp 115,000.00 Rp 3,450.00
Rp 105,000.00 Rp 157.50
Rp 1,971,585.00
Rp 1,575,000.00 Rp 1,575,000.00
Rp 94,500.00 Rp 5,670.00
Rp 80,000.00 Rp 264,000.00
Rp 100,000.00 Rp 110,000.00
Rp 115,000.00 Rp 115.00
Rp 105,000.00 Rp 16,800.00
Rp 1,047,260.00
Rp 825,000.00 Rp 825,000.00
Rp 247,500.00 Rp 74,250.00
Rp 1,060.00 Rp 6,360.00
Rp 340,000.00 Rp 3,400.00
Rp 80,000.00 Rp 96,000.00
Rp 100,000.00 Rp 14,500.00
Rp 115,000.00 Rp 17,250.00
Rp 105,000.00 Rp 10,500.00
Rp 42,475.00
Rp 30,000.00 Rp 30,000.00
Rp 80,000.00 Rp 800.00
Rp 100,000.00 Rp 10,000.00
Rp 115,000.00 Rp 1,150.00
Rp 105,000.00 Rp 525.00
Rp 77,550.00
Rp 35,000.00 Rp 35,000.00
Rp 3,000.00 Rp 75.00
Rp 80,000.00 Rp 800.00
Rp 100,000.00 Rp 40,000.00
Rp 115,000.00 Rp 1,150.00
Rp 105,000.00 Rp 525.00
Rp 2,637,940.00
Rp 2,450,000.00 Rp 2,450,000.00
Rp 490,000.00 Rp 98,000.00
Rp 80,000.00 Rp 6,000.00
Rp 100,000.00 Rp 75,000.00
Rp 115,000.00 Rp 8,625.00
Rp 105,000.00 Rp 315.00
Rp 377,015.20
Rp 283,000.00 Rp 283,000.00
Rp 33,960.00 Rp 4,075.20
Rp 80,000.00 Rp 6,000.00
Rp 100,000.00 Rp 75,000.00
Rp 115,000.00 Rp 8,625.00
Rp 105,000.00 Rp 315.00
Rp 30,278.75
Rp 15,500.00 Rp 18,600.00
Rp 5,425.00 Rp 1,898.75
Rp 80,000.00 Rp 2,880.00
Rp 100,000.00 Rp 6,000.00
Rp 115,000.00 Rp 690.00
Rp 105,000.00 Rp 210.00
Rp 73,199.38
Rp 38,750.00 Rp 46,500.00
Rp 13,562.50 Rp 4,746.88
Rp 80,000.00 Rp 6,480.00
Rp 100,000.00 Rp 13,500.00
Rp 115,000.00 Rp 1,552.50
Rp 105,000.00 Rp 420.00
Rp 85,823.75
Rp 57,500.00 Rp 69,000.00
Rp 20,125.00 Rp 7,043.75
Rp 80,000.00 Rp 2,880.00
Rp 100,000.00 Rp 6,000.00
Rp 115,000.00 Rp 690.00
Rp 105,000.00 Rp 210.00
Rp 261,175.00
Rp 47,500.00 Rp 47,500.00
Rp 100,000.00 Rp 210,000.00
Rp 105,000.00 Rp 3,675.00
Rp 285,175.00
Rp 71,500.00 Rp 71,500.00
Rp 100,000.00 Rp 210,000.00
Rp 105,000.00 Rp 3,675.00
Rp 343,175.00
Rp 129,500.00 Rp 129,500.00
Rp 100,000.00 Rp 210,000.00
Rp 105,000.00 Rp 3,675.00
Rp 393,675.00
Rp 180,000.00 Rp 180,000.00
Rp 100,000.00 Rp 210,000.00
Rp 105,000.00 Rp 3,675.00
Rp 366,175.00
Rp 152,500.00 Rp 152,500.00
Rp 100,000.00 Rp 210,000.00
Rp 105,000.00 Rp 3,675.00
Rp 255,675.00
Rp 42,000.00 Rp 42,000.00
Rp 100,000.00 Rp 210,000.00
Rp 105,000.00 Rp 3,675.00
Rp 236,925.00
Rp 23,250.00 Rp 23,250.00
Rp 100,000.00 Rp 210,000.00
Rp 105,000.00 Rp 3,675.00
Rp 243,175.00
Rp 29,500.00 Rp 29,500.00
Rp 100,000.00 Rp 210,000.00
Rp 105,000.00 Rp 3,675.00
Rp 241,675.00
Rp 28,000.00 Rp 28,000.00
Rp 100,000.00 Rp 210,000.00
Rp 105,000.00 Rp 3,675.00
Rp 263,675.00
Rp 50,000.00 Rp 50,000.00
Rp 100,000.00 Rp 210,000.00
Rp 105,000.00 Rp 3,675.00
Rp 427,945.00
Rp 4,100.00 Rp 12,300.00
Rp 4,600.00 Rp 69,000.00
Rp 550.00 Rp 550.00
Rp 550.00 Rp 1,100.00
Rp 55.00 Rp 1,320.00
Rp 130,000.00 Rp 130,000.00
Rp 100,000.00 Rp 210,000.00
Rp 105,000.00 Rp 3,675.00
Rp 83,795.00
Rp 11,200.00 Rp 12,320.00
Rp 100,000.00 Rp 67,800.00
Rp 105,000.00 Rp 3,675.00
Rp 3,876,175.00
Rp 3,662,500.00 Rp 3,662,500.00
Rp 100,000.00 Rp 210,000.00
Rp 105,000.00 Rp 3,675.00
I. PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan
2 Pengukuran dan Pasang Papan Bowplank
3 Pembuatan gudang semen dan alat-alat
4 Pagar sementara dari seng gelombang tinggi 2 m
5 Papan Nama Proyek
m² Rp 13,250.00
m³ Rp 138,981.00
m² Rp 999,955.00
m' Rp 355,325.00
unit Rp 273,487.50
m³ Rp 62,625.00
m³ Rp 76,725.00
m³ Rp 184,625.00
m³ Rp 259,050.00
m³ Rp 45,250.00
m³ Rp 875,547.86
m³ Rp 1,032,320.69
m³ Rp 1,042,382.55
kg Rp 150,550.00
m² Rp 184,145.00
m² Rp 197,270.00
m² Rp 289,651.25
m² Rp 297,939.50
m² Rp 334,651.25
m² Rp 262,926.25
kg Rp 29,585.00
kg Rp 29,865.00
m³ Rp 897,620.00
m³ Rp 551,220.00
m² Rp 106,035.80
m² Rp 109,307.20
m² Rp 58,362.56
m² Rp 57,074.40
m² Rp 31,645.00
m² Rp 324,698.00
m² Rp 192,925.00
m' Rp 114,137.50
m² Rp 142,340.00
m² Rp 1,177,350.00
m' Rp 1,430,025.00
m' Rp 633,450.00
m² Rp 397,100.00
m' Rp 113,305.00
m² Rp 449,068.50
m² Rp 449,068.50
m² Rp 1,571,512.50
m² Rp 277,012.50
m² Rp 296,262.50
m² Rp 293,003.75
buah Rp 26,212.50
buah Rp 48,725.00
buah Rp 222,475.00
buah Rp 51,237.50
m² Rp 21,897.00
m² Rp 21,897.00
m² Rp 113,145.00
m² Rp 20,539.50
m² Rp 115,310.00
m' Rp 119,870.00
buah Rp 229,507.50
buah Rp 1,971,585.00
buah Rp 1,047,260.00
buah Rp 42,475.00
buah Rp 77,550.00
unit Rp 2,637,940.00
unit Rp 377,015.20
m' Rp 30,278.75
m' Rp 73,199.38
m' Rp 85,823.75
titik Rp 261,175.00
titik Rp 285,175.00
titik Rp 343,175.00
titik Rp 393,675.00
buah Rp 366,175.00
buah Rp 255,675.00
buah Rp 236,925.00
buah Rp 243,175.00
buah Rp 241,675.00
buah Rp 263,675.00
unit Rp 427,945.00
m' Rp 83,795.00
unit Rp 3,876,175.00
1 Kolom (40x40)
- Beton K-250 8.38 m³ Rp 1,042,382.55
- Besi 1,543.22 Kg Rp 15,055.00
- Bekisting 84.00 m² Rp 289,651.25
2 Kolom (15x15)
- Beton K-255 1.52 m³ Rp 1,032,320.69
- Besi 463.15 Kg Rp 15,055.00
- Bekisting 39.90 m² Rp 289,651.25
3 Kolom pagar (15x15)
- Beton K-255 2.37 m³ Rp 1,032,320.69
- Besi 725.97 Kg Rp 15,055.00
- Bekisting 62.10 m² Rp 289,651.25
4 Ringbalk pagar (15x15)
- Beton K-255 1.47 m³ Rp 1,032,320.69
- Besi 196.66 Kg Rp 15,055.00
- Bekisting 14.11 m² Rp 289,651.25
5 Ringbalk dinding kolam (15x15)
- Beton K-255 1.06 m³ Rp 1,032,320.69
- Besi 196.95 Kg Rp 15,055.00
- Bekisting 14.11 m² Rp 289,651.25
6 Tangga utama
1 Kolom (40x40)
- Beton K-250 9.56 m³ Rp 1,042,382.55
- Besi 1,737.05 Kg Rp 15,055.00
- Bekisting 96.00 m² Rp 289,651.25
2 Kolom (15x15)
- Beton K-225 1.91 m³ Rp 1,032,320.69
- Besi 576.38 Kg Rp 15,055.00
- Bekisting 50.40 m² Rp 289,651.25
3 Balok (25x55)
- Beton K-250 4.29 m³ Rp 1,042,382.55
- Besi 689.11 Kg Rp 15,055.00
- Bekisting 43.94 m² Rp 297,939.50
4 Balok (25x50)
- Beton K-250 11.81 m³ Rp 1,042,382.55
- Besi 1,902.49 Kg Rp 15,055.00
- Bekisting 123.25 m² Rp 297,939.50
5 Balok (20x40)
- Beton K-250 2.40 m³ Rp 1,042,382.55
- Besi 490.96 Kg Rp 15,055.00
- Bekisting 32.55 m² Rp 297,939.50
6 Tangga utama
- Beton K-250 5.11 m³ Rp 1,042,382.55
- Besi 660.12 Kg Rp 15,055.00
- Bekisting 25.33 m² Rp 262,926.25
7 Plat lantai 2
- Beton K-250 26.80 m³ Rp 1,042,382.55
- Besi 9,604.70 Kg Rp 15,055.00
- Bekisting 223.33 m² Rp 334,651.25
1 Kolom (40x40)
- Beton K-250 8.37 m³ Rp 1,042,382.55
- Besi 1,556.37 Kg Rp 15,055.00
- Bekisting 84.00 m² Rp 289,651.25
2 Kolom (15x15)
- Beton K-225 1.12 m³ Rp 1,032,320.69
- Besi 332.00 Kg Rp 15,055.00
- Bekisting 29.40 m² Rp 289,651.25
3 Balok (25x55)
- Beton K-250 4.29 m³ Rp 1,042,382.55
- Besi 689.11 Kg Rp 15,055.00
- Bekisting 43.94 m² Rp 297,939.50
4 Balok (25x50)
- Beton K-250 7.36 m³ Rp 1,042,382.55
- Besi 1,189.80 Kg Rp 15,055.00
- Bekisting 76.88 m² Rp 297,939.50
5 Balok (20x40)
- Beton K-250 2.40 m³ Rp 1,042,382.55
- Besi 490.96 Kg Rp 15,055.00
- Bekisting 32.55 m² Rp 297,939.50
6 Balok RB (20x40)
- Beton K-250 1.38 m³ Rp 1,042,382.55
- Besi 253.93 Kg Rp 15,055.00
- Bekisting 18.30 m² Rp 297,939.50
7 Balok RB (15x30)
- Beton K-250 0.15 m³ Rp 1,042,382.55
- Besi 31.94 Kg Rp 15,055.00
- Bekisting 2.83 m² Rp 297,939.50
8 Plat lantai 3
- Beton K-250 17.09 m³ Rp 1,042,382.55
- Besi 6,125.28 Kg Rp 15,055.00
- Bekisting 142.43 m² Rp 334,651.25
9 Plat dak atap
- Beton K-250 1.29 m³ Rp 1,042,382.55
- Besi 556.47 Kg Rp 15,055.00
- Bekisting 12.94 m² Rp 334,651.25
1 Balok RB (20x40)
- Beton K-250 2.42 m³ Rp 1,042,382.55
- Besi 613.19 Kg Rp 15,055.00
- Bekisting 34.72 m² Rp 297,939.50
2 Balok RB (15x30)
- Beton K-250 0.86 m³ Rp 1,042,382.55
- Besi 191.19 Kg Rp 15,055.00
- Bekisting 15.67 m² Rp 297,939.50
1 Kuda-kuda type K
- 2L.60.60.6 361.31 Kg Rp 29,585.00
- 2L.50.50.5 673.62 Kg Rp 29,585.00
- Jarum Gording Ø10 mm 20.42 Kg Rp 15,055.00
3 Pintu type P1
- Kusen alumunium 15.60 m' Rp 113,305.00
- Daun pintu 5.04 m² Rp 1,571,512.50
- Engsel Pintu 9.00 buah Rp 26,212.50
- Kunci pintu tanam 3.00 buah Rp 222,475.00
5 Jendela type J1
- Kusen alumunium 12.10 m' Rp 113,305.00
- Daun jendela 4.37 m² Rp 449,068.50
- Kaca bening t = 5 mm 3.67 m² Rp 277,012.50
- Engsel Jendela 4.00 buah Rp 48,725.00
- Kunci Jendela geser 2.00 buah Rp 51,237.50
6 Jendela type J2
- Kusen alumunium 9.10 m' Rp 113,305.00
- Daun jendela 1.38 m² Rp 449,068.50
- Kaca bening t = 5 mm 2.53 m² Rp 277,012.50
- Engsel Jendela 2.00 buah Rp 48,725.00
7 Jendela type J3
- Kusen alumunium 15.80 m' Rp 113,305.00
- Daun jendela 6.75 m² Rp 449,068.50
- Kaca bening t = 5 mm 5.81 m² Rp 277,012.50
- Engsel Jendela 6.00 buah Rp 48,725.00
- Kunci Jendela geser 3.00 buah Rp 51,237.50
8 Jendela type J4
- Kusen alumunium 6.20 m' Rp 113,305.00
- Daun jendela 1.90 m² Rp 449,068.50
- Kaca bening t = 5 mm 1.62 m² Rp 277,012.50
- Engsel Jendela 2.00 buah Rp 48,725.00
- Kunci Jendela geser 1.00 buah Rp 51,237.50
9 Jendela type BV
- Kusen alumunium 6.60 m' Rp 113,305.00
- Kaca buram t = 5 mm 0.60 m² Rp 296,262.50
3 Pintu type P1
- Kusen alumunium 26.00 m' Rp 113,305.00
- Daun pintu 8.40 m² Rp 1,571,512.50
- Engsel pintu 15.00 buah Rp 26,212.50
- Kunci pintu tanam 5.00 buah Rp 222,475.00
5 Jendela type J5
- Kusen alumunium 20.60 m' Rp 113,305.00
- Daun jendela 7.60 m² Rp 449,068.50
- Kaca bening t = 5 mm 6.48 m² Rp 277,012.50
- Engsel jendela 4.00 buah Rp 48,725.00
- Kunci jendela geser 2.00 buah Rp 51,237.50
6 Jendela type BV
- Kusen alumunium 4.40 m' Rp 113,305.00
- Kaca buram t = 5 mm 0.40 m² Rp 296,262.50
2 Pintu type P1
- Kusen alumunium 20.80 m' Rp 113,305.00
- Daun pintu 6.72 m² Rp 1,571,512.50
- Engsel pintu 12.00 buah Rp 26,212.50
- Kunci pintu tanam 4.00 buah Rp 222,475.00
4 Jendela type J5
- Kusen alumunium 51.50 m' Rp 113,305.00
- Daun jendela 19.00 m² Rp 449,068.50
- Kaca bening t = 5 mm 16.20 m² Rp 277,012.50
- Engsel jendela 20.00 buah Rp 48,725.00
- Kunci jendela geser 10.00 buah Rp 51,237.50
5 Jendela type J6
- Kusen alumunium 30.40 m' Rp 113,305.00
- Kaca bening t = 5 mm 9.21 m² Rp 296,262.50
6 Jendela type J7
- Kusen alumunium 39.40 m' Rp 113,305.00
- Kaca bening t = 5 mm 9.60 m² Rp 277,012.50
7 Jendela type BV
- Kusen alumunium 4.40 m' Rp 113,305.00
- Kaca buram t = 5 mm 0.40 m² Rp 296,262.50
V. PEKERJAAN MEP
Rp 85,890,904.50
Rp 8,334,250.00
Rp 15,565,872.00
Rp 41,217,700.00
Rp 2,500,000.00
Rp 4,000,000.00
Rp 8,999,595.00
Rp 273,487.50
Rp 5,000,000.00
Rp132,655,345.98
Rp 17,861,144.11
Rp 7,545,021.41
Rp 77,063,438.74
Rp 11,006,563.03
Rp 9,352,812.44
Rp 9,826,366.24
Rp 194,348,119.78
Rp 7,188,204.13
Rp 465,528.05
Rp 1,669,304.95
Rp 700,855.87
Rp 2,814,432.90
Rp 2,584,826.51
Rp 1,325,844.00
Rp 13,342,496.70
Rp 8,730,969.54
Rp 4,714,112.00
Rp 7,505,154.40
Rp 3,245,503.08
Rp 3,535,584.00
Rp 7,256,396.55
Rp 19,664,703.70
Rp 20,159,727.00
Rp 1,287,185.53
Rp 8,573,273.23
Rp 9,575,870.33
Rp 7,228,088.32
Rp 20,574,786.54
Rp 14,291,816.96
Rp 4,326,589.85
Rp 12,410,533.80
Rp 11,176,331.85
Rp174,710,213.78
Rp 8,734,803.90
Rp 23,233,219.25
Rp 24,330,705.00
Rp 1,570,107.36
Rp 6,972,750.20
Rp 11,557,084.88
Rp 2,444,976.23
Rp 10,929,414.22
Rp 17,987,342.63
Rp 1,512,611.23
Rp 2,960,750.09
Rp 4,087,824.57
Rp 1,098,122.50
Rp 2,965,140.14
Rp 4,086,871.71
Rp 4,950,118.40
Rp 9,897,978.08
Rp 6,660,658.11
Rp 2,755,057.43
Rp 17,123,988.93
Rp 8,850,688.93
Rp483,565,743.46
Rp 9,966,810.01
Rp 26,151,293.77
Rp 27,806,520.00
Rp 1,974,366.46
Rp 8,677,373.50
Rp 14,598,423.00
Rp 4,473,255.76
Rp 10,374,549.40
Rp 13,092,206.48
Rp 12,307,949.42
Rp 28,641,992.89
Rp 36,721,043.38
Rp 2,497,154.65
Rp 7,391,415.93
Rp 9,697,930.73
Rp 5,325,376.12
Rp 9,938,073.76
Rp 6,660,658.11
Rp 27,933,464.06
Rp 144,598,724.36
Rp 74,737,161.69
Rp 351,115,779.88
Rp 8,726,172.78
Rp 23,431,191.68
Rp 24,330,705.00
Rp 1,151,775.03
Rp 4,998,260.69
Rp 8,515,746.75
Rp 4,473,255.76
Rp 10,374,549.40
Rp 13,092,206.48
Rp 7,676,690.62
Rp 17,912,388.81
Rp 22,904,099.06
Rp 2,497,154.65
Rp 7,391,415.93
Rp 9,697,930.73
Rp 1,435,813.14
Rp 3,822,900.37
Rp 5,452,292.85
Rp 161,002.99
Rp 480,832.60
Rp 842,423.94
Rp 17,813,576.42
Rp 92,216,055.35
Rp 47,662,704.28
Rp 1,346,954.96
Rp 8,377,627.10
Rp 4,330,052.52
Rp 30,545,291.76
Rp 2,523,011.99
Rp 9,231,510.65
Rp 10,344,459.44
Rp 900,774.44
Rp 2,878,312.97
Rp 4,667,222.27
Rp185,964,357.24
Rp 10,689,208.43
Rp 19,929,154.21
Rp 307,400.22
Rp 5,046,076.77
Rp 12,565,583.80
Rp 102,466.74
Rp 9,655,597.28
Rp 17,024,771.09
Rp 274,729.66
Rp 106,674,232.14
Rp 3,695,136.92
Rp713,486,172.97
Rp231,533,825.08
Rp 71,369,766.20
Rp 19,057,411.74
Rp 10,898,991.80
Rp 81,110,742.09
Rp 2,951,294.40
Rp 6,222,964.50
Rp 21,857,867.22
Rp 18,064,787.13
Rp134,084,147.98
Rp 87,316,678.68
Rp 3,151,578.24
Rp 42,576,352.81
Rp 1,039,538.25
Rp100,224,919.63
Rp 69,486,183.75
Rp 8,077,576.83
Rp 1,205,719.24
Rp 6,569,522.63
Rp 14,885,917.20
Rp 43,351,850.13
Rp 2,045,155.25
Rp 1,414,565.78
Rp 1,852,407.56
Rp 1,778,420.25
Rp 341,075.00
Rp 153,712.50
Rp 157,275.00
Rp 222,475.00
Rp 2,288,761.00
Rp 725,694.70
Rp 1,167,578.10
Rp 1,847,673.38
Rp 194,900.00
Rp 102,475.00
Rp 78,637.50
Rp 222,475.00
Rp 1,767,558.00
Rp 7,920,423.00
Rp 235,912.50
Rp 667,425.00
Rp 1,065,000.00
Rp 1,370,990.50
Rp 1,961,531.21
Rp 1,017,189.90
Rp 194,900.00
Rp 102,475.00
Rp 1,031,075.50
Rp 619,714.53
Rp 701,395.65
Rp 97,450.00
Rp 51,237.50
Rp 1,790,219.00
Rp 3,031,212.38
Rp 1,608,057.56
Rp 292,350.00
Rp 153,712.50
Rp 702,491.00
Rp 853,230.15
Rp 448,760.25
Rp 97,450.00
Rp 51,237.50
Rp 747,813.00
Rp 177,757.50
Rp 29,655,183.42
Rp 27,733,215.67
Rp 1,921,967.75
Rp 145,825,114.50
Rp 16,130,682.00
Rp 5,130,945.00
Rp 5,827,740.00
Rp 118,735,747.50
Rp 28,811,132.22
Rp 13,302,419.47
Rp 9,470,897.74
Rp 3,780,572.26
Rp 2,257,242.75
Rp434,842,733.46
Rp 54,521,938.79
Rp 39,868,753.89
Rp 3,771,098.40
Rp 8,429,689.50
Rp 2,452,397.00
Rp 71,785,525.26
Rp 42,919,187.81
Rp 4,027,016.64
Rp 23,562,445.07
Rp 1,276,875.75
Rp 56,465,611.77
Rp 38,184,809.50
Rp 2,242,737.02
Rp 16,038,065.25
Rp 49,813,448.92
Rp 3,138,548.50
Rp 754,435.08
Rp 5,281,045.56
Rp 3,152,845.47
Rp 682,150.00
Rp 461,137.50
Rp 78,637.50
Rp 222,475.00
Rp 2,753,311.50
Rp 754,435.08
Rp 1,841,180.85
Rp 2,240,089.28
Rp 292,350.00
Rp 204,950.00
Rp 78,637.50
Rp 222,475.00
Rp 2,945,930.00
Rp 13,200,705.00
Rp 393,187.50
Rp 1,112,375.00
Rp 1,065,000.00
Rp 2,334,083.00
Rp 3,412,920.60
Rp 1,795,041.00
Rp 194,900.00
Rp 102,475.00
Rp 498,542.00
Rp 118,505.00
Rp 362,576.00
Rp 118,505.00
Rp 19,094,751.04
Rp 17,389,507.54
Rp 1,705,243.50
Rp152,073,507.00
Rp 16,130,682.00
Rp 6,081,120.00
Rp 129,861,705.00
Rp 31,087,950.67
Rp 8,698,437.27
Rp 8,233,126.02
Rp 2,370,525.31
Rp 11,785,862.07
Rp235,015,653.37
Rp 40,164,623.32
Rp 30,385,442.12
Rp 2,295,451.20
Rp 5,031,333.00
Rp 2,452,397.00
Rp 53,337,034.12
Rp 32,710,289.88
Rp 2,451,227.52
Rp 17,387,556.22
Rp 787,960.50
Rp 39,113,757.77
Rp 37,829,752.24
Rp 1,284,005.54
Rp 57,474,807.34
Rp 2,753,311.50
Rp 754,435.08
Rp 1,841,180.85
Rp 2,240,089.28
Rp 292,350.00
Rp 204,950.00
Rp 78,637.50
Rp 222,475.00
Rp 2,356,744.00
Rp 10,560,564.00
Rp 314,550.00
Rp 889,900.00
Rp 710,000.00
Rp 5,835,207.50
Rp 8,532,301.50
Rp 4,487,602.50
Rp 974,500.00
Rp 512,375.00
Rp 3,444,472.00
Rp 2,728,577.63
Rp 4,464,217.00
Rp 2,659,320.00
Rp 498,542.00
Rp 118,505.00
Rp 22,723,970.24
Rp 21,149,150.62
Rp 1,574,819.63
Rp 2,438,782.50
Rp 2,438,782.50
Rp 19,762,678.08
Rp 6,572,567.03
Rp 8,233,126.02
Rp 2,883,037.19
Rp 2,073,947.85
Rp 47,139,690.16
Rp 26,453,474.66
Rp 4,752,845.50
Rp 8,959,568.75
Rp 6,973,801.25
Rp 65,188,771.30
Rp 42,174,295.00
Rp 2,872,925.00
Rp 3,136,925.00
Rp 2,402,225.00
Rp 787,350.00
Rp 1,098,525.00
Rp 1,534,050.00
Rp 2,132,325.00
Rp 243,175.00
Rp 2,658,425.00
Rp 263,675.00
Rp 427,945.00
Rp 12,988,225.00
Rp 11,628,525.00
Rp 23,014,476.30
Rp 127,425.00
Rp 5,914,755.00
Rp 1,047,260.00
Rp 465,300.00
Rp 1,131,045.60
Rp 687,500.00
Rp 229,507.50
Rp 1,748,900.60
Rp 2,561,978.13
Rp 3,544,520.88
Rp 281,283.60
Rp 2,825,000.00
Rp 2,450,000.00
Rp 68,563,986.63
Rp 50,456,345.00
Rp 4,962,325.00
Rp 5,418,325.00
Rp 343,175.00
Rp 1,098,525.00
Rp 1,022,700.00
Rp 2,132,325.00
Rp 243,175.00
Rp 2,175,075.00
Rp 263,675.00
Rp 427,945.00
Rp 12,988,225.00
Rp 19,380,875.00
Rp 18,107,641.63
Rp 127,425.00
Rp 5,914,755.00
Rp 1,047,260.00
Rp 232,650.00
Rp 2,637,940.00
Rp 754,030.40
Rp 999,198.75
Rp 1,727,505.25
Rp 4,385,593.63
Rp 281,283.60
Rp 43,079,815.96
Rp 32,519,620.00
Rp 2,089,400.00
Rp 2,281,400.00
Rp 343,175.00
Rp 732,350.00
Rp 767,025.00
Rp 1,421,550.00
Rp 243,175.00
Rp 1,691,725.00
Rp 427,945.00
Rp 10,893,350.00
Rp 11,628,525.00
Rp 10,560,195.96
Rp 84,950.00
Rp 3,943,170.00
Rp 155,100.00
Rp 754,030.40
Rp 797,845.06
Rp 1,350,528.47
Rp 3,287,049.63
Rp 187,522.40
NO URAIAN PEKERJAAN
I. PEKERJAAN PERSIAPAN
A SUB STRUKTUR
- LANTAI 1
- LANTAI 2
- LANTAI 3
- RING BALK
- ATAP
- LANTAI 1
- LANTAI 2
- LANTAI 3
- ATAP
V. PEKERJAAN MEP
- LANTAI 1
- LANTAI 2
- LANTAI 3
Rp 85,890,904.50
Rp 132,655,345.98
Rp 194,348,119.78
Rp 174,710,213.78
Rp 483,565,743.46
Rp 351,115,779.88
Rp 30,545,291.76
Rp 185,964,357.24
Rp 713,486,172.97
Rp 434,842,733.46
Rp 235,015,653.37
Rp 47,139,690.16
Rp 65,188,771.30
Rp 68,563,986.63
Rp 43,079,815.96
II. PEKERJAAN TANAH Rp 132,655,345.98 4.087 0.817 0.817 0.817 0.817 0.817
V. PEKERJAAN MEP
JUMLAH (RENCANA) : 1.323 1.323 0.817 2.314 5.062 5.590 5.590 4.910 6.146 5.727 6.731 6.268 7.916
JUMLAH KOMULATIF (RENCANA) : 1.323 2.646 3.463 5.777 10.839 16.429 22.018 26.929 33.075 38.802 45.533 51.801 59.717
14 15 16 17 18 19 20 (%)
100%
90%
80%
70%
60%
0.941
50%
2.864 2.864
40%
2.747 2.747
0.726 0.726
20%
0.664 0.664
0%