PONDASI FOOTPLAT

TYPE FOOTPLAT JUMLAH FOOTPLAT DIMENSI VOLUME BETON BESI Kg/m³ BEKISTING m²/m³
F1 28 150 X 150 25.200 m³ 56.42 Kg/m³ 2.67 m²/m³
F2 11 200 X 200 17.600 m³ 39.44 Kg/m³ 2.00 m²/m³
JUMLAH 39

PONDASI FOOTPLAT
NAMA DIMENSI n Volum
Beton Bekisting Besi
P (P-) L (L-) T Jenis Tul Ø Type jarak n Length
L a b c d
40 D 20 D 15 D 6D
F1 1.50 0.05 1.50 0.05 0.40 28 25.20 67.20 TP atas 13 D 4 1.95 0.08
150 X 150 TP bawah 13 D 0.150 11 1.40 0.08
ts atas 13 D 4 1.95 0.08
Luas pn d13 0.0001327 ts Bawah 13 D 0.150 11 1.40 0.08

F2 2.00 0.05 2.00 0.05 0.40 11 17.60 35.20 TP atas 13 D 4 1.95 0.08
200 X 200 TP bawah 13 D 0.150 15 1.40 0.08
ts atas 13 D 4 1.95 0.08
Luas pn d13 0.0001327 ts Bawah 13 D 0.150 15 1.40 0.08
KOLOM LANTAI 1
TYPE KOLOM JUMLAH KOLOM DIMENSI VOLUME BETON BESI Kg/m³ BEKISTING m²/m³

K1 1 40 X 40 0.657 m³ 229.63 Kg/m³ 10.11 m²/m³


K2 1 40 X 40 0.661 m³ 182.91 Kg/m³ 10.05 m²/m³
K3 1 40 X 40 0.664 m³ 136.72 Kg/m³ 9.99 m²/m³
KP 1 15 X 15 0.094 m³ 294.46 Kg/m³ 26.48 m²/m³
JUMLAH 4

KOLOM LANTAI 1
NAMA DIMENSI n Volum
Beton Bekisting Besi

P (P-) L (L-) T Jenis Tul Ø Type jarak n


Length
L a b c d
40 D 20 D 15 D 6D

K1 0.4 0.03 0.4 0.030 4.15 1 0.657 6.64 TP 16 D 16 4.75


40 X 40 1 ts tump 10 Ø 0.100 22 1.48 0.06
Luas pn d16 0.000201 1 ts lap 10 Ø 0.200 11 1.48 0.06
Luas pn Ø10 0.000079

K2 0.4 0.03 0.4 0.030 4.15 1 0.661 6.64 TP 16 D 12 4.75


40 X 40 1 ts tump 10 Ø 0.100 22 1.48 0.06
Luas pn d16 0.000201 1 ts lap 10 Ø 0.200 11 1.48 0.06
Luas pn Ø10 0.000079

K3 0.4 0.03 0.4 0.030 4.15 1 0.664 6.64 TP 16 D 8 4.75


40 X 40 1 ts tump 10 Ø 0.100 22 1.48 0.06
Luas pn d16 0.000201 1 ts lap 10 Ø 0.200 11 1.48 0.06
Luas pn Ø10 0.000079

KP 0.15 0.03 0.15 0.030 4.15 1 0.094 2.49 TP 12 Ø 4 4.75


15 X 15 1 ts tump 10 Ø 0.100 22 0.48 0.06
Luas pn Ø12 0.000113 1 ts lap 10 Ø 0.200 11 0.48 0.06
Luas pn Ø10 0.000079
SLOOF
BEKISTING
TYPE BALOK PANJANG BALOK DIMENSI VOLUME BETON BESI Kg/m³ m²/m³
BS1 1.00 25 X 40 0.08 m³ 368.07 Kg/m³ 9.53 m²/m³
BS2 1.00 25 X 40 0.096 m³ 212.22 Kg/m³ 8.38 m²/m³
BS3 1.00 25 X 40 0.091 m³ 313.45 Kg/m³ 8.75 m²/m³
BSP 1.00 15 X 25 0.031 m³ 250.27 Kg/m³ 14.63 m²/m³
JUMLAH 2

SLOOF
NAMA DIMENSI n Volum
Beton Bekisting Besi
P (H) (H-) (B) (B-) Jenis Tul Ø Type jarak n Length
L a b c d
40 D 20 D 15 D 6D
BS1 1.0 0.40 0.03 0.25 0.03 1 0.084 0.80 TA tump T. 16 D 5 0.25 0.24
25 X 40 1 TA tump Te. 16 D 4 0.25 0.24
1 TA lap 16 D 4 0.50 0.24
1 TB tump T. 16 D 5 0.25 0.24
1 TB tump Te. 16 D 4 0.25 0.24
Luas pn d16 0.000201 1 TB lap 16 D 4 0.50 0.24
Luas pn Ø10 0.0000785 1 ts tump 10 Ø 0.100 6 1.18 0.06
1 ts lap 10 Ø 0.200 4 1.18 0.06

BS2 1.0 0.40 0.03 0.25 0.03 1 0.096 0.80 TA tump 16 D 4 0.50
25 X 40 1 TA lap 16 D 4 0.50
1 TB tump 16 D 4 0.50
Luas pn d16 0.000201 1 TB lap 16 D 4 0.50
Luas pn Ø10 7.85E-05 1 ts tump 10 Ø 0.100 6 1.18 0.06
1 ts lap 10 Ø 0.200 4 1.18 0.06

BS3 1.0 0.40 0.03 0.25 0.03 1 0.091 0.80 TA tump 16 D 5 0.50 0.24
25 X 40 1 TA lap 16 D 4 0.50 0.24
1 TB tump 16 D 5 0.50 0.24
Luas pn d16 0.000201 1 TB lap 16 D 4 0.50 0.24
Luas pn Ø10 0.0000785 1 ts tump 10 Ø 0.100 6 1.18 0.06
1 ts lap 10 Ø 0.200 4 1.18 0.06
BSP 1.0 0.23 0.03 0.15 0.03 1 0.031 0.46 TA tump 12 D 2 0.50
15 X 25 1 TA lap 12 D 2 0.50
1 TB tump 12 D 2 0.50
Luas pn Ø12 0.000113 1 TB lap 12 D 2 0.50
Luas pn Ø10 0.0000785 1 ts tump 10 Ø 0.100 6 0.64 0.06
1 ts lap 10 Ø 0.200 4 0.64 0.06

KOLOM LANTAI 2
TYPE KOLOM JUMLAH KOLOM DIMENSI VOLUME BETON BESI Kg/m³ BEKISTING m²/m³

K1 1 40 X 40 0.633 m³ 229.93 Kg/m³ 10.11 m²/m³


K2 1 40 X 40 0.637 m³ 183.00 Kg/m³ 10.05 m²/m³
K3 1 40 X 40 0.641 m³ 136.61 Kg/m³ 9.99 m²/m³
KP 1 15 X 15 0.091 m³ 293.82 Kg/m³ 26.46 m²/m³
JUMLAH 4

KOLOM LANTAI 2
NAMA DIMENSI n Volum
Beton Bekisting Besi

P (P-) L (L-) T Jenis Tul Ø Type jarak n Length


L a b c d
40 D 20 D 15 D 6D

K1 0.40 0.03 0.40 0.030 4.00 1 0.633 6.40 TP 16 D 16 4.60


40 X 40 1 ts tump 10 Ø 0.100 21 1.48 0.06
Luas pn d16 0.000201 1 ts lap 10 Ø 0.200 11 1.48 0.06
Luas pn Ø10 0.000079

K2 0.40 0.03 0.40 0.030 4.00 1 0.637 6.40 TP 16 D 12 4.60


40 X 40 1 ts tump 10 Ø 0.100 21 1.48 0.06
Luas pn d16 0.000201 1 ts lap 10 Ø 0.200 11 1.48 0.06
Luas pn Ø10 0.000079
K3 0.40 0.03 0.40 0.030 4.00 1 0.641 6.40 TP 16 D 8 4.60
40 X 40 1 ts tump 10 Ø 0.100 21 1.48 0.06
Luas pn d16 0.000201 1 ts lap 10 Ø 0.200 11 1.48 0.06
Luas pn Ø10 0.000079

KP 0.15 0.03 0.15 0.030 4.00 1 0.091 2.40 TP 12 Ø 4 4.60


15 X 15 1 ts tump 10 Ø 0.100 21 0.48 0.06
Luas pn Ø12 0.000113 1 ts lap 10 Ø 0.200 11 0.48 0.06
Luas pn Ø10 0.000079

BALOK LANTAI 2 ELEVASI + 4.00


BEKISTING
TYPE BALOK PANJANG BALOK DIMENSI VOLUME BETON BESI Kg/m³ m²/m³
B (30 X 70) 1.00 30 X 70 0.20 m³ 156.85 Kg/m³ 8.32 m²/m³
B (30 X 50) 1.00 30 X 50 0.144 m³ 196.89 Kg/m³ 9.00 m²/m³
B (30 X 40) 1.00 30 X 40 0.112 m³ 262.55 Kg/m³ 9.86 m²/m³
B (25 X 40) 1.00 25 X 40 0.097 m³ 168.68 Kg/m³ 10.83 m²/m³
B (15 X 25) 1.00 15 X 25 0.036 m³ 230.46 Kg/m³ 18.11 m²/m³
JUMLAH 5

BALOK LANTAI 2
NAMA DIMENSI n Volum

Beton Bekisting
Besi

P (H) (H-) (B) (B-) Jenis Tul Ø Type jarak n


Length
L a b c d
40 D 20 D 15 D 6D
B (30 X 70) 1.0 0.70 0.03 0.30 0.03 1 0.204 1.70 TA tump 16 D 5 0.50 0.24
30 X 70 1 TA lap 16 D 3 0.50 0.24
1 TB tump 16 D 4 0.50 0.24
Luas pn d16 0.000201 1 TB lap 16 D 4 0.50 0.24
Luas pn Ø10 7.85E-05 1 TS 10 Ø 2 1.00 0.15
1 ts tump 10 Ø 0.100 6 1.88 0.06
1 ts lap 10 Ø 0.200 4 1.88 0.06
B (30 X 50) 1.0 0.50 0.03 0.30 0.03 1 0.144 1.30 TA tump 16 D 5 0.50 0.24
30 X 50 1 TA lap 16 D 3 0.50 0.24
0.15 1 TB tump 16 D 3 0.50 0.24
Luas pn d16 0.000201 1 TB lap 16 D 4 0.50 0.24
Luas pn Ø10 7.85E-05 1 TS 10 Ø 2 1.00 0.15
1 ts tump 10 Ø 0.100 6 1.48 0.06
1 ts lap 10 Ø 0.200 4 1.48 0.06

B (30 X 40) 1.0 0.4 0.03 0.3 0.03 1 0.112 1.10 TA tump 16 D 5 0.50 0.24
30 X 40 1 TA lap 16 D 4 0.50 0.24
1 TB tump 16 D 5 0.50 0.24
Luas pn d16 0.000201 1 TB lap 16 D 4 0.50 0.24
Luas pn Ø10 0.0000785 1 ts tump 10 Ø 0.100 6 1.28 0.06
1 ts lap 10 Ø 0.200 4 1.28 0.06

B (25 X 40) 1.0 0.4 0.03 0.25 0.03 1 0.097 1.05 TA tump 16 D 3 0.50
25 X 40 1 TA lap 16 D 3 0.50
1 TB tump 16 D 3 0.50
Luas pn d16 0.00020 1 TB lap 16 D 3 0.50
Luas pn Ø10 0.0000785 1 ts tump 10 Ø 0.150 5 1.18 0.06
1 ts lap 10 Ø 0.200 4 1.18 0.06

B (15 X 25) 1.0 0.25 0.03 0.15 0.03 1 0.036 0.65 TA tump 13 D 2 0.50
15 X 25 1 TA lap 13 D 2 0.50
1 TB tump 13 D 2 0.50
Luas pn d13 0.0001327 1 TB lap 13 D 2 0.50
Luas pn Ø10 0.0000785 1 ts tump 10 Ø 0.150 5 0.68 0.06
1 ts lap 10 Ø 0.200 4 0.68 0.06
KOLOM LANTAI 3
TYPE KOLOM JUMLAH KOLOM DIMENSI VOLUME BETON BESI Kg/m³ BEKISTING m²/m³

K1 1 40 X 40 0.633 m³ 229.93 Kg/m³ 10.11 m²/m³


K3 1 40 X 40 0.641 m³ 136.61 Kg/m³ 9.99 m²/m³
KP 1 15 X 15 0.091 m³ 293.82 Kg/m³ 26.46 m²/m³
JUMLAH 3

KOLOM LANTAI 3
NAMA DIMENSI n Volum

Beton Bekisting Besi

P (P-) L (L-) T Jenis Tul Ø Type jarak n


Length
L a b c d
40 D 20 D 15 D 6D

K1 0.40 0.03 0.40 0.030 4.00 1 0.633 6.40 TP 16 D 16 4.60


40 X 40 1 ts tump 10 Ø 0.100 21 1.48 0.06
Luas pn d16 0.000201 1 ts lap 10 Ø 0.200 11 1.48 0.06
Luas pn Ø10 0.000079

K3 0.40 0.03 0.40 0.030 4.00 1 0.641 6.40 TP 16 D 8 4.60


40 X 40 1 ts tump 10 Ø 0.100 21 1.48 0.06
Luas pn d16 0.000201 1 ts lap 10 Ø 0.200 11 1.48 0.06
Luas pn Ø10 0.000079
KP 0.15 0.03 0.15 0.030 4.00 1 0.091 2.40 TP 12 Ø 4 4.60
15 X 15 1 ts tump 10 Ø 0.100 21 0.48 0.06
Luas pn Ø12 0.000113 1 ts lap 10 Ø 0.200 11 0.48 0.06
Luas pn Ø10 0.000079

BALOK LANTAI 3 ELEVASI + 8.00


BEKISTING
TYPE BALOK PANJANG BALOK DIMENSI VOLUME BETON BESI Kg/m³ m²/m³
B (30 X 70) 1.00 30 X 70 0.20 m³ 156.85 Kg/m³ 8.32 m²/m³
B (30 X 50) 1.00 30 X 50 0.144 m³ 196.89 Kg/m³ 9.00 m²/m³
B (30 X 40) 1.00 30 X 40 0.112 m³ 262.55 Kg/m³ 9.86 m²/m³
B (25 X 40) 1.00 25 X 40 0.097 m³ 168.68 Kg/m³ 10.83 m²/m³
B (15 X 25) 1.00 15 X 25 m³ Kg/m³ m²/m³
JUMLAH 5
BALOK LANTAI 3
NAMA DIMENSI n Volum

Beton Bekisting
Besi

P (H) (H-) (B) (B-) Jenis Tul Ø Type jarak n


Length
L a b c d
40 D 20 D 15 D 6D
B (30 X 70) 1.0 0.70 0.03 0.30 0.03 1 0.204 1.70 TA tump 16 D 5 0.50 0.24
30 X 70 1 TA lap 16 D 3 0.50 0.24
1 TB tump 16 D 4 0.50 0.24
Luas pn d16 0.000201 1 TB lap 16 D 4 0.50 0.24
Luas pn Ø10 7.85E-05 1 TS 10 Ø 2 1.00 0.15
1 ts tump 10 Ø 0.100 6 1.88 0.06
1 ts lap 10 Ø 0.200 4 1.88 0.06

B (30 X 50) 1.0 0.50 0.03 0.30 0.03 1 0.144 1.30 TA tump 16 D 5 0.50 0.24
30 X 50 1 TA lap 16 D 3 0.50 0.24
0.15 1 TB tump 16 D 3 0.50 0.24
Luas pn d16 0.000201 1 TB lap 16 D 4 0.50 0.24
Luas pn Ø10 7.85E-05 1 TS 10 Ø 2 1.00 0.15
1 ts tump 10 Ø 0.100 6 1.48 0.06
1 ts lap 10 Ø 0.200 4 1.48 0.06

B (30 X 40) 1.0 0.4 0.03 0.3 0.03 1 0.112 1.10 TA tump 16 D 5 0.50 0.24
30 X 40 1 TA lap 16 D 4 0.50 0.24
1 TB tump 16 D 5 0.50 0.24
Luas pn d16 0.000201 1 TB lap 16 D 4 0.50 0.24
Luas pn Ø10 0.0000785 1 ts tump 10 Ø 0.100 6 1.28 0.06
1 ts lap 10 Ø 0.200 4 1.28 0.06
B (25 X 40) 1.0 0.4 0.03 0.25 0.03 1 0.097 1.05 TA tump 16 D 3 0.50
25 X 40 1 TA lap 16 D 3 0.50
1 TB tump 16 D 3 0.50
Luas pn d16 0.000201 1 TB lap 16 D 3 0.50
Luas pn Ø10 0.0000785 1 ts tump 10 Ø 0.150 5 1.18 0.06
1 ts lap 10 Ø 0.200 4 1.18 0.06
B (15 X 25) 1.0 0.25 0.03 0.15 0.03 1 0.036 0.50 TA tump 13 D 2 0.50
15 X 25 1 TA lap 13 D 2 0.50
1 TB tump 13 D 2 0.50
Luas pn d13 0.0001327 1 TB lap 13 D 2 0.50
Luas pn Ø10 0.0000785 1 ts tump 10 Ø 0.150 5 0.68 0.06
1 ts lap 10 Ø 0.200 4 0.68 0.06

RINK BALK ELEVASI + 11.80


BEKISTING
TYPE BALOK PANJANG BALOK DIMENSI VOLUME BETON BESI Kg/m³ m²/m³
RB ( 20 x 30 ) 1.00 20 X 30 0.056 m³ 273.00 Kg/m³ 10.73 m²/m³
RB.P ( 15 X 25 ) 1.00 15 X 25 0.036 m³ 223.67 Kg/m³ 13.78 m²/m³
JUMLAH 2

RINK BALK
NAMA DIMENSI n Volum

Beton Bekisting
Besi

P (H) (H-) (B) (B-) Jenis Tul Ø Type jarak n


Length
L a b c d
40 D 20 D 15 D 6D

RB ( 20 x 30 ) 1.0 0.3 0.03 0.2 0.03 1 0.056 0.60 TA tump 16 D 3 0.50


20 X 30 1 TA lap 16 D 3 0.50
1 TB tump 16 D 3 0.50
Luas pn d16 0.000201 1 TB lap 16 D 3 0.50
Luas pn Ø10 0.0000785 1 ts tump 10 Ø 0.100 6 0.88 0.06
1 ts lap 10 Ø 0.200 4 0.88 0.06

RB.P ( 15 X 25 ) 1.0 0.25 0.03 0.15 0.03 1 0.036 0.50 TA tump 12 D 2 0.50
15 X 25 1 TA lap 12 D 2 0.50
1 TB tump 12 D 2 0.50
Luas pn Ø12 0.000113 1 TB lap 12 D 2 0.50
Luas pn Ø10 0.0000785 1 ts tump 10 Ø 0.100 6 0.68 0.06
1 ts lap 10 Ø 0.200 4 0.68 0.06

BALOK TANDON ELEVASI + 11.35


BEKISTING
TYPE BALOK PANJANG BALOK DIMENSI VOLUME BETON BESI Kg/m³ m²/m³
B ( 20 X 30 ) 1.00 20 X 30 0.058 m³ 210.49 Kg/m³ 10.43 m²/m³
B ( 30 X 50 ) 1.00 30 X 50 0.000 m³ 0.00 Kg/m³ 0.00 m²/m³
B ( 30 X 70 ) 1.00 30 X 70 m³ Kg/m³ m²/m³
JUMLAH 2

BALOK TANDON
NAMA DIMENSI n Volum

Beton Bekisting
Besi

P (H) (H-) (B) (B-) Jenis Tul Ø Type jarak n


Length
L a b c d
40 D 20 D 15 D 6D

B ( 20 X 30 ) 1.0 0.3 0.03 0.2 0.03 1 0.058 0.60 TA tump 16 D 2 0.50


20 X 30 1 TA lap 16 D 2 0.50
1 TB tump 16 D 2 0.50
Luas pn d16 0.000201 1 TB lap 16 D 2 0.50
Luas pn Ø10 0.0000785 1 ts tump 10 Ø 0.100 6 0.88 0.06
1 ts lap 10 Ø 0.200 4 0.88 0.06

B ( 30 X 50 ) 1.0 0.50 0.03 0.30 0.03 1 0.149 1.30 TA tump 16 D 3 0.50


30 X 50 1 TA lap 16 D 3 0.50
0.15 1 TB tump 16 D 3 0.50
Luas pn d16 0.000201 1 TB lap 16 D 3 0.50
Luas pn Ø10 7.85E-05 1 TS 10 Ø 2 1.00
1 ts tump 10 Ø 0.100 6 1.48 0.06
1 ts lap 10 Ø 0.200 4 1.48 0.06

B ( 30 X 70 ) 1.0 0.7 0.03 0.3 0.03 1 0.208 1.40 TA tump 16 D 2 0.50


30 X 70 1 TA lap 16 D 2 0.50
1 TB tump 16 D 2 0.50
Luas pn d16 0.000201 1 TB lap 16 D 2 0.50
Luas pn Ø10 0.0000785 1 ts tump 10 Ø 0.100 6 1.88 0.06
1 ts lap 10 Ø 0.200 4 1.88 0.06

KOLOM PEDISTAL
TYPE KOLOM JUMLAH KOLOM DIMENSI VOLUME BETON BESI Kg/m³ BEKISTING m²/m³

K. PEDISTAL 39 40 X 40 10.936 m³ 260.71 Kg/m³ 9.98 m²/m³


JUMLAH 39

KOLOM PEDISTAL
NAMA DIMENSI n Volum

Beton Bekisting Besi

P (P-) L (L-) T Jenis Tul Ø Type jarak n


Length
L a b c d
40 D 20 D 15 D 6D

K. PEDISTAL 0.40 0.03 0.40 0.030 1.75 39 10.936 109.20 TP 16 D 16 2.35


40 X 40 39 ts tump 10 Ø 0.100 10 1.48 0.06
Luas pn d16 0.00020 39 ts lap 10 Ø 0.200 5 1.48 0.06
Luas pn Ø10 0.000079
Rasio

tot Total
Berat/m' Berat Besi Bekisting
panjang berat

2.03 1.042 236.65 710.94 28.21 2.67


1.48 1.042 474.29 710.94 28.21
2.03 1.042 236.65
1.48 1.042 474.29

2.03 1.042 92.97 347.05 19.72 2.00


1.48 1.042 254.08 347.05 19.72
2.03 1.042 92.97
1.48 1.042 254.08

PONDASI FOOTPLAT
Rasio

tot Total
Berat/m' Berat Besi Bekisting
panjang berat

4.75 1.578 119.95 119.95 182.65 10.11


1.54 0.617 20.41 30.856 46.99
1.54 0.617 10.44

4.75 1.578 89.96 89.96 136.19 10.05


1.54 0.617 20.41 30.856 46.71
1.54 0.617 10.44

4.75 1.578 59.97 59.97 90.27 9.99


1.54 0.617 20.41 30.856 46.45
1.54 0.617 10.44

4.75 0.888 16.87 16.87 179.39 26.48


0.54 0.617 7.16 10.820 115.07
0.54 0.617 3.66

KOLOM LANTAI 1
Rasio

tot Total
Berat/m' Berat Besi Bekisting
panjang berat

0.49 1.578 3.87 23.26 277.03 9.53


0.49 1.578 3.09 7.64 91.04
0.74 1.578 4.67
0.49 1.578 3.87
0.49 1.578 3.09
0.74 1.578 4.67
1.24 0.617 4.59
1.24 0.617 3.06

0.50 1.578 3.16 12.63 132.19 8.38


0.50 1.578 3.16 7.64 80.03
0.50 1.578 3.16
0.50 1.578 3.16
1.24 0.617 4.59
1.24 0.617 3.06

0.74 1.578 5.84 21.02 229.86 8.75


0.74 1.578 4.67 7.64 83.59
0.74 1.578 5.84
0.74 1.578 4.67
1.24 0.617 4.59
1.24 0.617 3.06
0.50 0.888 0.89 3.55 112.97 14.63
0.50 0.888 0.89 4.32 137.30
0.50 0.888 0.89
0.50 0.888 0.89
0.70 0.617 2.59
0.70 0.617 1.73

SLOOF

Rasio

tot Total
Berat/m' Berat Besi Bekisting
panjang berat

4.60 1.578 116.16 116.16 183.45 10.11


1.54 0.617 19.46 29.432 46.48
1.54 0.617 9.97
4.60 1.578 87.12 87.12 136.79 10.05
1.54 0.617 19.46 29.432 46.21
1.54 0.617 9.97
4.60 1.578 58.08 58.08 90.67 9.99
1.54 0.617 19.46 29.432 45.95
1.54 0.617 9.97

4.60 0.888 16.33 16.33 180.06 26.46


0.54 0.617 6.82 10.320 113.76
0.54 0.617 3.50

KOLOM LANTAI 2

Rasio

tot Total
Berat/m' Berat Besi Bekisting
panjang berat
0.74 1.578 5.84 20.10 98.34 8.32
0.74 1.578 3.50 11.96 58.50
0.74 1.578 4.67
0.74 1.578 4.67
1.15 0.617 1.42
1.94 0.617 7.18
1.94 0.617 4.78
0.74 1.578 5.84 18.94 131.14 9.00
0.74 1.578 3.50 9.49 65.75
0.74 1.578 3.50
0.74 1.578 4.67
1.15 0.617 1.42
1.54 0.617 5.70
1.54 0.617 3.80

0.74 1.578 5.84 21.02 188.48 9.86


0.74 1.578 4.67 8.26 74.07
0.74 1.578 5.84
0.74 1.578 4.67
1.34 0.617 4.96
1.34 0.617 3.30

0.50 1.578 2.37 9.47 97.69 10.83


0.50 1.578 2.37 6.88 70.98
0.50 1.578 2.37
0.50 1.578 2.37
1.24 0.617 3.82
1.24 0.617 3.06

0.50 1.042 1.04 4.17 116.09 18.11


0.50 1.042 1.04 4.11 114.37
0.50 1.042 1.04
0.50 1.042 1.04
0.74 0.617 2.28
0.74 0.617 1.82
BALOK LANTAI 2

Rasio

tot Total
Berat/m' Berat Besi Bekisting
panjang berat

4.60 1.578 116.16 116.16 183.45 10.11


1.54 0.617 19.46 29.432 46.48
1.54 0.617 9.97

4.60 1.578 58.08 58.08 90.67 9.99


1.54 0.617 19.46 29.432 45.95
1.54 0.617 9.97
4.60 0.888 16.33 16.33 180.06 26.46
0.54 0.617 6.82 10.320 113.76
0.54 0.617 3.50

KOLOM LANTAI 3
Rasio

tot Total
Berat/m' Berat Besi Bekisting
panjang berat

0.74 1.578 5.84 20.10 98.34 8.32


0.74 1.578 3.50 11.96 58.50
0.74 1.578 4.67
0.74 1.578 4.67
1.15 0.617 1.42
1.94 0.617 7.18
1.94 0.617 4.78

0.74 1.578 5.84 18.94 131.14 9.00


0.74 1.578 3.50 9.49 65.75
0.74 1.578 3.50
0.74 1.578 4.67
1.15 0.617 1.42
1.54 0.617 5.70
1.54 0.617 3.80

0.74 1.578 5.84 21.02 188.48 9.86


0.74 1.578 4.67 8.26 74.07
0.74 1.578 5.84
0.74 1.578 4.67
1.34 0.617 4.96
1.34 0.617 3.30
0.50 1.578 2.37 9.47 97.69 10.83
0.50 1.578 2.37 6.88 70.98
0.50 1.578 2.37
0.50 1.578 2.37
1.24 0.617 3.82
1.24 0.617 3.06
0.50 1.042 1.04 4.17 116.09 13.93
0.50 1.042 1.04 4.11 114.37
0.50 1.042 1.04
0.50 1.042 1.04
0.74 0.617 2.28
0.74 0.617 1.82

BALOK LANTAI 3

Rasio

tot Total
Berat/m' Berat Besi Bekisting
panjang berat

0.50 1.578 2.37 9.47 169.35 10.73


0.50 1.578 2.37 5.80 103.64
0.50 1.578 2.37
0.50 1.578 2.37
0.94 0.617 3.48
0.94 0.617 2.32

0.50 0.888 0.89 3.55 97.90 13.78


0.50 0.888 0.89 4.56 125.77
0.50 0.888 0.89
0.50 0.888 0.89
0.74 0.617 2.74
0.74 0.617 1.82

RINK BALK

Rasio

tot Total
Berat/m' Berat Besi Bekisting
panjang berat

0.50 1.578 1.58 6.31 109.75 10.43


0.50 1.578 1.58 5.80 100.74
0.50 1.578 1.58
0.50 1.578 1.58
0.94 0.617 3.48
0.94 0.617 2.32

0.50 1.578 2.37 10.70 71.82 8.72


0.50 1.578 2.37 9.49 63.71
0.50 1.578 2.37
0.50 1.578 2.37
1.00 0.617 1.23
1.54 0.617 5.70
1.54 0.617 3.80

0.50 1.578 1.58 6.31 30.31 6.72


0.50 1.578 1.58 11.96 57.42
0.50 1.578 1.58
0.50 1.578 1.58
1.94 0.617 7.18
1.94 0.617 4.78

BALOK TANDON
Rasio

tot Total
Berat/m' Berat Besi Bekisting
panjang berat

2.35 1.578 2314.33 2314.33 211.62 9.98


1.54 0.617 351.76 536.891 49.09
1.54 0.617 185.13

KOLOM PEDISTAL
PONDASI FOOTPLAT
VOLUME
TYPE FOOTPLAT JUMLAH FOOTPLAT DIMENSI BESI Kg BEKISTING m²
BETON
P1 3 150 X 150 2.70 m³ 171.69 Kg 7.20 m²
P2 8 200 X 200 12.80 m³ 579.94 Kg 25.60 m²
P3 8 150 X 150 7.20 m³ 215.58 Kg 19.20 m²
JUMLAH 19

NAMA DIMENSI n Volum

Beton Bekisting Besi

P (P-) L (L-) T Jenis Tul Ø Type jarak n


Length
L a b c d
40 D 20 D 15 D 6D
P1 1.50 0.05 1.50 0.05 0.40 3 2.70 7.20 Tax 13 D 4 1.95 0.16
150 X 150 Tay 13 D 4 1.40 0.16
Tbx 13 D 0.150 11 1.95 0.16
Luas pn d13 0.000133 Tby 13 D 0.150 11 1.40 0.16

P2 2.00 0.05 2.00 0.05 0.40 8 12.80 25.60 Tax 13 D 4 1.95 0.16
200 X 200 Tay 13 D 4 1.40 0.16
Tbx 13 D 0.150 15 1.95 0.16
Luas pn d13 0.000133 Tby 13 D 0.150 15 1.40 0.16

P3 1.50 0.05 1.50 0.05 0.40 8 7.20 19.20 Tax 13 D 4 1.95 0.16
150 X 150 Tay 13 D 4 1.40 0.16
Tbx 13 D 0.150 11 1.95 0.16
Luas pn d13 0.000133 Tby 13 D 0.150 11 1.40 0.16
Rasio

tot Total
Berat/m' Berat Besi Bekisting
panjang berat

2.11 1.042 26.33 45.78 16.96 2.67


1.56 1.042 19.45 125.91 46.63
2.11 1.042 72.41
1.56 1.042 53.50

2.11 1.042 70.21 122.09 9.54 2.00


1.56 1.042 51.88 457.85 35.77
2.11 1.042 263.31
1.56 1.042 194.54

2.11 1.042 70.21 89.67 12.45 2.67


1.56 1.042 19.45 125.91 17.49
2.11 1.042 72.41
1.56 1.042 53.50

PONDASI FOOTPLAT
KOLOM PEDISTAL
TYPE KOLOM JUMLAH KOLOM DIMENSI VOLUME BESI Kg BEKISTING m²
BETON
K. PEDISTAL K1 15 40 X 40 6.961 m³ 1306.2 Kg 69.60 m²
K. PEDISTAL KP 19 15 X 15 1.247 m³ 569.5 Kg 33.06 m²
JUMLAH 34

KOLOM PEDISTAL
NAMA DIMENSI n Volum

Beton Bekisting Besi

tot
P (P-) L (L-) T Jenis Tul Ø Type jarak n
Length panjang

L a b c d
40 D 20 D 15 D 6D

K. PEDISTAL K1 0.40 0.03 0.40 0.030 2.90 15 6.961 69.60 TP 16 D 12 3.40 3.40
40 X 40 15 ts tump 10 Ø 0.100 15 1.48 0.12 1.60
Luas pn d16 0.00020 15 ts lap 10 Ø 0.200 8 1.48 0.12 1.60
Luas pn Ø10 0.000079

K. PEDISTAL KP 0.15 0.03 0.15 0.030 2.90 19 1.247 33.06 TP 16 D 4 3.40 3.40
15 X 15 19 ts tump 10 Ø 0.100 15 0.48 0.12 0.60
Luas pn d16 0.00020 19 ts lap 10 Ø 0.200 8 0.48 0.12 0.60
Luas pn Ø10 0.000079

KOLOM LANTAI 1
VOLUME
TYPE KOLOM JUMLAH KOLOM DIMENSI BESI Kg BEKISTING m²
BETON
K1 15 40 X 40 8.380 m³ 1543.22 Kg 84.00 m²
KP 19 15 X 15 1.521 m³ 463.15 Kg 39.90 m²
KP (PAGAR) 30 15 X 15 2.368 m³ 725.97 Kg 62.10 m²
JUMLAH 64
KOLOM LANTAI 1
NAMA DIMENSI n Volum
Beton Bekisting Besi
tot
P (P-) L (L-) T Jenis Tul Ø Type jarak n
Length panjang

L a b c d
40 D 20 D 15 D 6D

K1 0.4 0.03 0.4 0.030 3.50 15 8.380 84.00 TP 16 D 12 4.00 4.00


40 X 40 15 ts tump 10 Ø 0.100 18 1.48 0.12 1.60
Luas pn d16 0.000201 15 ts lap 10 Ø 0.200 10 1.48 0.12 1.60
Luas pn Ø10 0.000079

KP 0.15 0.03 0.15 0.030 3.50 19 1.521 39.90 TP 12 D 4 4.00 4.00


15 X 15 19 ts tump 10 Ø 0.100 18 0.48 0.12 0.60
Luas pn d12 0.000113 19 ts lap 10 Ø 0.200 10 0.48 0.12 0.60
Luas pn Ø10 0.000079

KP (PAGAR) 0.15 0.03 0.15 0.030 3.45 30 2.368 62.10 TP 12 Ø 4 3.95 3.95
15 X 15 30 ts tump 10 Ø 0.100 18 0.48 0.12 0.60
Luas pn Ø12 0.000113 30 ts lap 10 Ø 0.200 10 0.48 0.12 0.60
Luas pn Ø10 0.000079

KOLOM LANTAI 2
TYPE KOLOM JUMLAH KOLOM DIMENSI VOLUME BESI Kg BEKISTING m²
BETON
K1 15 40 X 40 9.562 m³ 1737.05 Kg 96.00 m²
KP 21 15 X 15 1.913 m³ 576.38 Kg 50.40 m²
JUMLAH 36
KOLOM LANTAI 2
NAMA DIMENSI n Volum
Beton Bekisting Besi
tot
P (P-) L (L-) T Ø Type jarak n Length panjang
L a b c d
Jenis Tul
40 D 20 D 15 D 6D

K1 0.40 0.03 0.40 0.030 4.00 15 9.562 96.00 TP 16 D 12 4.50 4.50


40 X 40 15 ts tump 10 Ø 0.100 21 1.48 0.12 1.60
Luas pn d16 0.000201 15 ts lap 10 Ø 0.200 11 1.48 0.12 1.60
Luas pn Ø10 0.000079

KP 0.15 0.03 0.15 0.030 4.00 21 1.913 50.40 TP 12 Ø 4 4.50 4.50


15 X 15 21 ts tump 10 Ø 0.100 21 0.48 0.12 0.60
Luas pn Ø12 0.000113 21 ts lap 10 Ø 0.200 11 0.48 0.12 0.60
Luas pn Ø10 0.000079

KOLOM LANTAI 3
VOLUME
TYPE KOLOM JUMLAH KOLOM DIMENSI BESI Kg BEKISTING m²
BETON
K1 15 40 X 40 8.371 m³ 1556.37 Kg 84.00 m²
KP 14 15 X 15 1.116 m³ 332.00 Kg 29.40 m²
JUMLAH 29

KOLOM LANTAI 3
NAMA DIMENSI n Volum

Beton Bekisting Besi


tot
P (P-) L (L-) T Jenis Tul Ø Type jarak n
Length panjang

L a b c d
40 D 20 D 15 D 6D

K1 0.40 0.03 0.40 0.030 3.50 15 8.371 84.00 TP 16 D 12 4.10 4.10


40 X 40 15 ts tump 10 Ø 0.100 18 1.48 0.06 1.54
Luas pn d16 0.000201 15 ts lap 10 Ø 0.200 10 1.48 0.06 1.54
Luas pn Ø10 0.000079
KP 0.15 0.03 0.15 0.030 3.50 14 1.116 29.40 TP 12 Ø 4 4.10 4.10
15 X 15 14 ts tump 10 Ø 0.100 18 0.48 0.06 0.54
Luas pn Ø12 0.000113 14 ts lap 10 Ø 0.200 10 0.48 0.06 0.54
Luas pn Ø10 0.000079
Rasio

Total
Berat/m' Berat Besi Bekisting
berat

1.578 965.88 965.88 138.75 10.00


0.617 221.94 340.308 48.89
0.617 118.37

1.578 407.82 407.82 327.07 26.51


0.617 105.42 161.646 129.64
0.617 56.22

KOLOM PEDISTAL
Rasio

Total
Berat/m' Berat Besi Bekisting
berat

1.578 1136.33 1136.33 135.61 10.02


0.617 266.33 406.890 48.56
0.617 140.56

0.888 269.88 269.88 177.44 26.23


0.617 126.51 193.273 127.07
0.617 66.77

0.888 420.80 420.80 177.67 26.22


0.617 199.75 305.168 128.85
0.617 105.42

KOLOM LANTAI 1
Rasio

Total
Berat/m' Berat Besi Bekisting
berat

1.578 1278.37 1278.37 133.70 10.04


0.617 303.32 458.676 47.97
0.617 155.36

0.888 335.57 335.57 175.46 26.35


0.617 159.24 240.805 125.91
0.617 81.56

KOLOM LANTAI 2

Rasio
Total
Berat/m' Berat Besi Bekisting
berat

1.578 1164.74 1164.74 139.13 10.03


0.617 256.34 391.632 46.78
0.617 135.29
0.888 203.83 203.83 182.69 26.35
0.617 83.89 128.170 114.88
0.617 44.28

KOLOM LANTAI 3
SLOOF
TYPE BALOK PANJANG BALOK DIMENSI VOLUME BETON BESI Kg BEKISTING m²
BS1 90.56 25 X 40 6.93 m³ 1366.6 Kg/m³ 72.45 m²
BSP 113.31 15 X 25 4.151 m³ 824.35 Kg/m³ 56.66 m²
JUMLAH 91

SLOOF
NAMA DIMENSI n Volum
Beton Bekisting Besi
P (H) (H-) (B) (B-) Jenis Tul Ø Type jarak n Length
L a b c d
40 D 20 D 15 D 6D
BS1 90.6 0.4 0.03 0.2 0.03 1 6.934 72.45 TA tump 16 D 3 45.28 0.24
25 X 40 1 TA lap 16 D 3 45.28 0.24
1 TB tump 16 D 3 45.28 0.24
Luas pn d16 0.00020096 1 TB lap 16 D 3 45.28 0.24
Luas pn Ø10 0.0000785 1 ts tump 10 Ø 0.100 454 1.08 0.12
1 ts lap 10 Ø 0.200 228 1.08 0.12

BSP 113.3 0.25 0.03 0.15 0.03 1 4.151 56.66 TA tump 12 D 2 56.66 0.18
15 X 25 1 TA lap 12 D 2 56.66 0.18
1 TB tump 12 D 2 56.66 0.18
Luas pn d12 0.00011304 1 TB lap 12 D 2 56.66 0.18
Luas pn Ø10 0.0000785 1 ts tump 10 Ø 0.100 568 0.68 0.12
1 ts lap 10 Ø 0.200 285 0.68 0.12
BALOK LANTAI 2 ELEVASI + 3.50
TYPE BALOK PANJANG BALOK DIMENSI VOLUME BETON BESI Kg BEKISTING m²
B (25 X 55) 32.55 25 X 55 4.29 m³ 689.11 Kg 43.94 m²
B (25 X 50) 98.60 25 X 50 11.8 m³ 1902.5 Kg 123.25 m²
B (20 X 40) 52.90 20 X 40 2.40 m³ 490.96 Kg 32.55 m²
JUMLAH 184
BALOK LANTAI 2
NAMA DIMENSI n Volum

Beton Bekisting
Besi

P (H) (H-) (B) (B-) Jenis Tul Ø Type jarak n


Length
L a b c d
40 D 20 D 15 D 6D
B (25 X 55) 32.6 0.55 0.03 0.25 0.03 1 4.291 43.94 TA tump 16 D 4 16.28 0.24
25 X 55 1 TA lap 16 D 3 16.28 0.24
1 TB tump 16 D 3 16.28 0.24
Luas pn d16 0.000201 1 TB lap 16 D 4 16.28 0.24
Luas pn Ø10 7.85E-05 1 TS 10 Ø 4 32.55 0.12
1 ts tump 10 Ø 0.100 164 1.48 0.12
1 ts lap 10 Ø 0.200 83 1.48 0.12

B (25 X 50) 98.6 0.50 0.03 0.25 0.03 1 11.808 123.25 TA tump 16 D 4 49.30 0.24
25 X 50 1 TA lap 16 D 3 49.30 0.24
12.325 1 TB tump 16 D 3 49.30 0.24
Luas pn d16 0.000201 1 TB lap 16 D 4 49.30 0.24
Luas pn Ø10 7.85E-05 1 TS 10 Ø 2 98.60 0.12
1 ts tump 10 Ø 0.100 494 1.38 0.12
1 ts lap 10 Ø 0.200 248 1.38 0.12

B (20 X 40) 32.6 0.4 0.03 0.2 0.03 1 2.396 32.55 TA tump 16 D 3 16.28
20 X 40 1 TA lap 16 D 3 16.28
1 TB tump 16 D 3 16.28
Luas pn d16 0.00020096 1 TB lap 16 D 3 16.28
Luas pn Ø10 0.0000785 1 ts tump 10 Ø 0.100 164 1.08 0.12
1 ts lap 10 Ø 0.200 83 1.08 0.12
BALOK LANTAI 3 ELEVASI + 7.50
TYPE BALOK PANJANG BALOK DIMENSI VOLUME BETON BESI Kg BEKISTING m²
B (25 X 55) 32.55 25 X 55 4.29 m³ 689.11 Kg 43.94 m²
B (25 X 50) 61.50 25 X 50 7.365 m³ 1189.8 Kg 76.88 m²
B (20 X 40) 30.90 20 X 40 2.396 m³ 490.96 Kg 32.55 m²
RB (20 X 40) 18.30 20 X 40 1.377 m³ 253.93 Kg 18.30 m²
RB (15 X 30) 4.35 15 X 20 0.154 m³ 31.94 Kg 2.83 m²
JUMLAH 148

BALOK LANTAI 3
NAMA DIMENSI n Volum

Beton Bekisting
Besi

P (H) (H-) (B) (B-) Jenis Tul Ø Type jarak n


Length
L a b c d
40 D 20 D 15 D 6D
B (25 X 55) 32.6 0.55 0.03 0.25 0.03 1 4.291 43.94 TA tump 16 D 4 16.28 0.24
25 X 55 1 TA lap 16 D 3 16.28 0.24
1 TB tump 16 D 3 16.28 0.24
Luas pn d16 0.000201 1 TB lap 16 D 4 16.28 0.24
Luas pn Ø10 7.85E-05 1 TS 10 Ø 4 32.55 0.12
1 ts tump 10 Ø 0.100 164 1.48 0.12
1 ts lap 10 Ø 0.200 83 1.48 0.12

B (25 X 50) 61.5 0.50 0.03 0.25 0.03 1 7.365 76.88 TA tump 16 D 4 30.75 0.24
25 X 50 1 TA lap 16 D 3 30.75 0.24
1 TB tump 16 D 3 30.75 0.24
Luas pn d16 0.000201 1 TB lap 16 D 4 30.75 0.24
Luas pn Ø10 7.85E-05 1 TS 10 Ø 2 61.50 0.12
1 ts tump 10 Ø 0.100 309 1.38 0.12
1 ts lap 10 Ø 0.200 155 1.38 0.12

B (20 X 40) 32.6 0.4 0.03 0.2 0.03 1 2.396 32.55 TA tump 16 D 3 16.28
20 X 40 1 TA lap 16 D 3 16.28
1 TB tump 16 D 3 16.28
Luas pn d16 0.00020096 1 TB lap 16 D 3 16.28
Luas pn Ø10 0.0000785 1 ts tump 10 Ø 0.100 164 1.08 0.12
1 ts lap 10 Ø 0.200 83 1.08 0.12
RB (20 X 40) 18.3 0.4 0.03 0.2 0.03 1 1.377 18.30 TA tump 16 D 3 9.15
20 X 40 1 TA lap 16 D 3 9.15
1 TB tump 16 D 3 9.15
Luas pn d16 0.00020 1 TB lap 16 D 3 9.15
Luas pn Ø10 0.0000785 1 ts tump 10 Ø 0.150 62 1.08 0.12
1 ts lap 10 Ø 0.200 47 1.08 0.12

RB (15 X 30) 4.4 0.25 0.03 0.15 0.03 1 0.154 2.83 TA tump 13 D 2 2.18
15 X 20 1 TA lap 13 D 2 2.18
1 TB tump 13 D 2 2.18
Luas pn d13 0.00013267 1 TB lap 13 D 2 2.18
Luas pn Ø10 0.0000785 1 ts tump 10 Ø 0.150 16 0.68 0.12
1 ts lap 10 Ø 0.200 12 0.68 0.12

RINK BALK ELEVASI + 11.00


TYPE BALOK PANJANG BALOK DIMENSI VOLUME BETON BESI Kg BEKISTING m²
RB ( 20 x 40 ) 43.40 20 X 40 2.420 m³ 613.19 Kg 34.72 m²
RB.P ( 15 X 20 ) 24.10 15 X 30 0.864 m³ 191.19 Kg 15.67 m²
JUMLAH 68

RINK BALK
NAMA DIMENSI n Volum

Beton Bekisting
Besi

P (H) (H-) (B) (B-) Jenis Tul Ø Type jarak n


Length
L a b c d
40 D 20 D 15 D 6D

RB ( 20 x 40 ) 43.4 0.3 0.03 0.2 0.03 1 2.420 34.72 TA tump 16 D 3 21.70


20 X 40 1 TA lap 16 D 3 21.70
1 TB tump 16 D 3 21.70
Luas pn d16 0.00020096 1 TB lap 16 D 3 21.70
Luas pn Ø10 0.0000785 1 ts tump 10 Ø 0.100 218 0.88 0.12
1 ts lap 10 Ø 0.200 110 0.88 0.12
RB.P ( 15 X 20 ) 24.1 0.25 0.03 0.15 0.03 1 0.864 15.67 TA tump 13 D 2 12.05
15 X 30 1 TA lap 13 D 2 12.05
1 TB tump 13 D 2 12.05
Luas pn d13 0.00013267 1 TB lap 13 D 2 12.05
Luas pn Ø10 0.0000785 1 ts tump 10 Ø 0.100 122 0.68 0.12
1 ts lap 10 Ø 0.200 62 0.68 0.12

BALOK PLAT DAK


TYPE BALOK PANJANG BALOK DIMENSI VOLUME BETON BESI Kg BEKISTING
m²/m³
B ( 15 X 20 ) 16.70 15 X 20 0.467 m³ 222.32 Kg 14.32 m²
JUMLAH 16.7

BALOK PLAT DAK


NAMA DIMENSI n Volum

Beton Bekisting
Besi

P (H) (H-) (B) (B-) Jenis Tul Ø Type jarak n


Length
L a b c d
40 D 20 D 15 D 6D

B ( 15 X 20 ) 16.7 0.2 0.03 0.15 0.03 1 0.467 6.68 TA tump 13 D 2 8.35


15 X 20 1 TA lap 13 D 2 8.35
1 TB tump 13 D 2 8.35
Luas pn d13 0.00013267 1 TB lap 13 D 2 8.35
Luas pn Ø8 0.0000785 1 ts tump 8 Ø 0.100 85 0.58 0.10
1 ts lap 8 Ø 0.200 43 0.58 0.10
RING BALK PAGAR
BEKISTING
TYPE BALOK PANJANG BALOK DIMENSI VOLUME BETON BESI Kg m²/m³
B ( 15 X 15 ) 68.93 15 X 15 1.465 m³ 196.66 Kg 14.11 m²
JUMLAH 68.9
RING BALK PAGAR
NAMA DIMENSI n Volum

Beton Bekisting
Besi

P (H) (H-) (B) (B-) Jenis Tul Ø Type jarak n


Length
L a b c d
40 D 20 D 15 D 6D

B ( 15 X 15 ) 68.9 0.15 0.03 0.15 0.03 1 1.465 20.68 TA tump 10 Ø 2 34.47


15 X 15 1 TA lap 10 Ø 2 34.47
1 TB tump 10 Ø 2 34.47
Luas pn Ø10 0.0000785 1 TB lap 10 Ø 2 34.47
Luas pn Ø8 0.0000785 1 ts tump 8 Ø 0.100 346 0.48 0.10
1 ts lap 8 Ø 0.200 174 0.48 0.10

RING BALK DINDING KOLAM


BEKISTING
TYPE BALOK PANJANG BALOK DIMENSI VOLUME BETON BESI Kg m²/m³
B ( 15 X 15 ) 50.03 15 X 15 1.064 m³ 196.95 Kg 14.11 m²
JUMLAH 50.0

RING BALK DINDING KOLAM


NAMA DIMENSI n Volum

Beton Bekisting
Besi

P (H) (H-) (B) (B-) Jenis Tul Ø Type jarak n


Length
L a b c d
40 D 20 D 15 D 6D
B ( 15 X 15 ) 50.0 0.15 0.03 0.15 0.03 1 1.064 15.01 TA tump 10 Ø 2 25.02
15 X 15 1 TA lap 10 Ø 2 25.02
1 TB tump 10 Ø 2 25.02
Luas pn Ø10 0.0000785 1 TB lap 10 Ø 2 25.02
Luas pn Ø8 0.0000785 1 ts tump 8 Ø 0.100 252 0.48 0.10
1 ts lap 8 Ø 0.200 127 0.48 0.10
Rasio

tot Total
Berat/m' Berat Besi Bekisting
panjang berat

45.52 1.578 215.52 862.10 124.33 10.45


45.52 1.578 215.52 504.54 72.76
45.52 1.578 215.52
45.52 1.578 215.52
1.20 0.617 335.87
1.20 0.617 168.67

56.84 0.888 100.91 403.65 97.25 13.65


56.84 0.888 100.91 420.70 101.36
56.84 0.888 100.91
56.84 0.888 100.91
0.80 0.617 280.14
0.80 0.617 140.56

SLOOF
Rasio

tot Total
Berat/m' Berat Besi Bekisting
panjang berat

16.52 1.578 104.26 445.47 103.81 10.24


16.52 1.578 78.19 243.64 56.77
16.52 1.578 78.19
16.52 1.578 104.26
32.67 0.617 80.56
1.60 0.617 161.77
1.60 0.617 81.87

49.54 1.578 312.74 1216.33 103.01 10.44


49.54 1.578 234.56 686.16 58.11
49.54 1.578 234.56
49.54 1.578 312.74
98.72 0.617 121.72
1.50 0.617 456.83
1.50 0.617 229.34

16.28 1.578 77.06 308.23 128.66 13.59


16.28 1.578 77.06 182.73 76.28
16.28 1.578 77.06
16.28 1.578 77.06
1.20 0.617 121.33
1.20 0.617 61.40
BALOK LANTAI 2
Rasio

tot Total
Berat/m' Berat Besi Bekisting
panjang berat

16.52 1.578 104.26 445.47 103.81 10.24


16.52 1.578 78.19 243.64 56.77
16.52 1.578 78.19
16.52 1.578 104.26
32.67 0.617 80.56
1.60 0.617 161.77
1.60 0.617 81.87

30.99 1.578 195.64 760.71 103.29 10.44


30.99 1.578 146.73 429.08 58.26
30.99 1.578 146.73
30.99 1.578 195.64
61.62 0.617 75.98
1.50 0.617 285.75
1.50 0.617 143.34

16.28 1.578 77.06 308.23 128.66 13.59


16.28 1.578 77.06 182.73 76.28
16.28 1.578 77.06
16.28 1.578 77.06
1.20 0.617 121.33
1.20 0.617 61.40
9.15 1.578 43.32 173.29 125.81 13.29
9.15 1.578 43.32 80.64 58.54
9.15 1.578 43.32
9.15 1.578 43.32
1.20 0.617 45.87
1.20 0.617 34.77

2.18 1.042 4.53 18.13 117.37 18.31


2.18 1.042 4.53 13.81 89.41
2.18 1.042 4.53
2.18 1.042 4.53
0.80 0.617 7.89
0.80 0.617 5.92

BALOK LANTAI 3

Rasio

tot Total
Berat/m' Berat Besi Bekisting
panjang berat
21.70 1.578 102.74 410.97 169.79 14.34
21.70 1.578 102.74 202.21 83.54
21.70 1.578 102.74
21.70 1.578 102.74
1.00 0.617 134.40
1.00 0.617 67.82
12.05 1.042 25.11 100.44 116.23 18.13
12.05 1.042 25.11 90.75 105.02
12.05 1.042 25.11
12.05 1.042 25.11
0.80 0.617 60.17
0.80 0.617 30.58

RINK BALK

Rasio

tot Total
Berat/m' Berat Besi Bekisting
panjang berat

8.35 1.042 17.40 69.60 149.16 14.32


8.35 1.042 17.40 34.14 73.17
8.35 1.042 17.40
8.35 1.042 17.40
0.68 0.395 22.67
0.68 0.395 11.47
BALOK PLAT DAK
Rasio

tot Total
Berat/m' Berat Besi Bekisting
panjang berat

34.47 0.617 42.50 169.98 116.01 14.11


34.47 0.617 42.50 118.18 80.65
34.47 0.617 42.50
34.47 0.617 42.50
0.58 0.395 78.63
0.58 0.395 39.54

RING BALK PAGAR

Rasio

tot Total
Berat/m' Berat Besi Bekisting
panjang berat
25.02 0.617 30.84 123.37 115.98 14.11
25.02 0.617 30.84 86.13 80.97
25.02 0.617 30.84
25.02 0.617 30.84
0.58 0.395 57.27
0.58 0.395 28.86

RING BALK DINDING KOLAM


PONDASI FOOTPLAT TANGGA
VOLUME
TYPE FOOTPLAT JUMLAH FOOTPLAT DIMENSI BESI Kg BEKISTING m²
BETON
FOOTPLAT 1 150 X 150 0.447 m³ 110.88 Kg 3.81 m²
JUMLAH 1

DIMENSI Volum

Beton Bekisting
Besi
NAMA n
P (P-) L (L-) T Jenis Tul Ø (mm) Type jarak n
Length (m)
L a b c d
40 D 20 D 15 D 6D
FOOTPLAT
Fp tangga 1.45 0.1 1.00 0.1 0.20 1 0.29 0.98 Tax 12 Ø 0.15 10 1.55 0.14
1 Tay 12 Ø 0.15 7 1.10 0.14
1 Tbx 16 D 0.15 10 1.85 0.19
1 Tby 16 D 0.15 7 1.40 0.19

1.45 0.025 0.12 0.025 0.9 1 0.16 2.83 TP kanan 12 Ø 0.150 7 1.45 0.24
1 TP kiri 12 Ø 0.150 7 1.45 0.24
1 ts 16 D 0.150 11 0.90 0.10

TANGGA
TYPE TANGGA JUMLAH JANGGA VOLUME BETON BESI Kg BEKISTING m²
TANGGA UTAMA LANTAI 1 1 4.749 m³ 657.5 Kg 25.33 m²
TANGGA UTAMA LANTAI 2 1 5.109 m³ 660.1 Kg 25.33 m²
JUMLAH 2
TANGGA UTAMA LANTAI 1
DIMENSI Volum

Beton Bekisting
Besi
NAMA n
P (P-) L T (T-) Jenis Tul Ø Type jarak n
Length
L a b c d

ANAK TANGGA 1.5 0.3 0.150 24 2.70 6.12 TH 10 Ø 1 1.50 0.25


24 ts 10 Ø 0.2 9 0.45 0.12
PELAT TANGGA 1 1.25 1.5 0.12 1 0.23 1.93 TV A 16 D 0.15 11 1.25
1 TV B 16 D 0.15 11 1.25
1 TH A 12 Ø 0.15 10 1.50 0.14
1 TH B 12 Ø 0.15 10 1.50 0.14

PELAT TANGGA 2 3.15 1.5 0.12 1 0.57 4.85 TV A 16 D 0.15 11 3.15


1 TV B 16 D 0.15 11 3.15
1 TH A 12 Ø 0.15 22 1.50
1 TH B 12 Ø 0.15 22 1.50

PELAT TANGGA 3 2.67 1.5 0.12 1 0.48 4.11 TV A 16 D 0.15 11 2.67


1 TV B 16 D 0.15 11 2.67
1 TH A 12 Ø 0.15 19 1.50 0.14
1 TH B 12 Ø 0.15 19 1.50 0.14

BORDES 3 1.5 0.12 1 0.54 4.50 TX A 12 Ø 0.15 11 3.00 0.14


1 TX B 12 Ø 0.15 11 3.00 0.14
1 TY A 12 Ø 0.15 21 1.50 0.14
1 TY B 12 Ø 0.15 21 1.50 0.14

BALOK BORDES 4.5 0.15 0.35 1 0.24 3.83 TA 12 D 3 4.50 0.36


1 TB 12 D 3 4.50 0.36
1 ts 10 Ø 0.15 31 0.84 0.12

TANGGA UTAMA LANTAI 2


DIMENSI Volum

Beton Bekisting
Besi
NAMA n
P (P-) L T (T-) Jenis Tul Ø Type jarak n
Length
L a b c d

ANAK TANGGA 1.5 0.3 0.170 24 3.06 6.12 TH 10 Ø 1 1.50 0.25


24 ts 10 Ø 0.2 9 0.47 0.12
PELAT TANGGA 1 1.25 1.5 0.12 1 0.23 1.93 TV A 16 D 0.15 11 1.25
1 TV B 16 D 0.15 11 1.25
1 TH A 12 Ø 0.15 10 1.50 0.14
1 TH B 12 Ø 0.15 10 1.50 0.14

PELAT TANGGA 2 3.15 1.5 0.12 1 0.57 4.85 TV A 16 D 0.15 11 3.15


1 TV B 16 D 0.15 11 3.15
1 TH A 12 Ø 0.15 22 1.50
1 TH B 12 Ø 0.15 22 1.50

PELAT TANGGA 3 2.67 1.5 0.12 1 0.48 4.11 TV A 16 D 0.15 11 2.67


1 TV B 16 D 0.15 11 2.67
1 TH A 12 Ø 0.15 19 1.50 0.14
1 TH B 12 Ø 0.15 19 1.50 0.14

BORDES 3 1.5 0.12 1 0.54 4.50 TX A 12 Ø 0.15 11 3.00 0.14


1 TX B 12 Ø 0.15 11 3.00 0.14
1 TY A 12 Ø 0.15 21 1.50 0.14
1 TY B 12 Ø 0.15 21 1.50 0.14

BALOK BORDES 4.5 0.15 0.35 1 0.24 3.83 TA 12 D 3 4.50 0.36


1 TB 12 D 3 4.50 0.36
1 ts 10 Ø 0.15 31 0.84 0.12
Rasio

tot Total berat


Berat/m' Berat Besi Bekisting
panjang (kg)

1.69 0.89 15.04 22.77 78.51 3.38


1.24 0.89 7.73 49.82 171.78
2.04 1.58 32.23
1.59 1.58 17.59

1.69 0.888 10.50 21.00 134.13 18.05


1.69 0.888 10.50 17.29 110.42
1.00 1.578 17.29

PONDASI FOOTPLAT TANGGA


Rasio

tot Berat/m' Berat Total berat Besi Bekisting


panjang
(kg)

1.75 0.62 25.89 101.80 37.70 2.27


0.57 0.62 75.90
1.25 1.58 21.70 43.40 192.90 8.56
1.25 1.58 21.70 29.19 129.73
1.64 0.89 14.59
1.64 0.89 14.59

3.15 1.58 54.69 109.37 192.90 8.56


3.15 1.58 54.69 58.59 103.34
1.50 0.89 29.30
1.50 0.89 29.30

2.67 1.58 46.35 92.71 192.90 8.56


2.67 1.58 46.35 55.46 115.40
1.64 0.89 27.73
1.64 0.89 27.73

3.14 0.89 30.70 122.70 227.23 8.33


3.14 0.89 30.70
1.64 0.89 30.65
1.64 0.89 30.65

4.86 0.89 12.94 25.89 109.57 16.19


4.86 0.89 12.94 18.35 77.66
0.96 0.62 18.35

TANGGA UTAMA LANTAI 1


Rasio

tot Berat/m' Berat Total berat Besi Bekisting


panjang

1.75 0.62 25.89 104.46 34.14 2.00


0.59 0.62 78.57
1.25 1.58 21.70 43.40 192.90 8.56
1.25 1.58 21.70 29.19 129.73
1.64 0.89 14.59
1.64 0.89 14.59

3.15 1.58 54.69 109.37 192.90 8.56


3.15 1.58 54.69 58.59 103.34
1.50 0.89 29.30
1.50 0.89 29.30

2.67 1.58 46.35 92.71 192.90 8.56


2.67 1.58 46.35 55.46 115.40
1.64 0.89 27.73
1.64 0.89 27.73

3.14 0.89 30.70 122.70 227.23 8.33


3.14 0.89 30.70
1.64 0.89 30.65
1.64 0.89 30.65

4.86 0.89 12.94 25.89 109.57 16.19


4.86 0.89 12.94 18.35 77.66
0.96 0.62 18.35

TANGGA UTAMA LANTAI 2


PLAT LANTAI
VOLUME
TYPE PLAT LUAS PLAT LANTAI BESI Kg BEKISTING m²
BETON
PLAT LANTAI 2 223 m² 26.798 m³ 9604.7 Kg 223.33 m²
PLAT LANTAI 3 142 m² 17.089 m³ 6125.3 Kg 142.43 m²
PLAT GAZEBO 26 m² 2.643 m³ 1137.4 Kg 26.45 m²
PLAT DAK ATAP 13 m² 1.292 m³ 556.5 Kg 12.94 m²
JUMLAH 405 m²

NAMA DIMENSI n Volum

Beton Bekisting
Besi

L.1 (L.1 - ) L.2 (L.2 - ) t Jenis Tul Ø Type jarak n


Length
L a b c d
40 D 20 D 15 D 6D
PLAT LANTAI 2 1 0.03 1 0.03 0.12 223.3 26.80 223.33 T ats x 10 D 0.150 16 0.97 0.12
223.3 T ats y 10 D 0.150 16 0.97 0.12
223.3 T ats Tx 10 D 0.150 16 0.97 0.12
Luas pn d10 7.85E-05 223.3 T ats Ty 10 D 0.150 16 0.97 0.12

PLAT LANTAI 3 1 0.03 1 0.03 0.12 142.4 17.09 142.43 T ats x 10 D 0.150 16 0.97 0.12
142.4 T ats y 10 D 0.150 16 0.97 0.12
142.4 T ats Tx 10 D 0.150 16 0.97 0.12
Luas pn d10 7.85E-05 142.4 T ats Ty 10 D 0.150 16 0.97 0.12

PLAT GAZEBO 1 0.03 1 0.03 0.1 26.4 2.64 26.45 T ats x 10 D 0.150 16 0.97 0.12
26.4 T ats y 10 D 0.150 16 0.97 0.12
26.4 T ats Tx 10 D 0.150 16 0.97 0.12
Luas pn d10 7.85E-05 26.4 T ats Ty 10 D 0.150 16 0.97 0.12
PLAT DAK ATAP 1 0.03 1 0.03 0.1 12.9 1.29 12.94 T ats x 10 D 0.150 16 0.97 0.12
12.9 T ats y 10 D 0.150 16 0.97 0.12
12.9 T ats Tx 10 D 0.150 16 0.97 0.12
Luas pn d10 7.85E-05 12.9 T ats Ty 10 D 0.150 16 0.97 0.12
Rasio

tot Total
Berat/m' Berat Besi Bekisting
panjang berat

1.09 0.617 2401.17 9604.70 358.41 8.33


1.09 0.617 2401.17
1.09 0.617 2401.17
1.09 0.617 2401.17

1.09 0.617 1531.32 6125.28 358.43 8.33


1.09 0.617 1531.32
1.09 0.617 1531.32
1.09 0.617 1531.32

1.09 0.617 284.36 1137.43 430.35 10.01


1.09 0.617 284.36
1.09 0.617 284.36
1.09 0.617 284.36
1.09 0.617 139.12 556.47 430.64 10.01
1.09 0.617 139.12
1.09 0.617 139.12
1.09 0.617 139.12

PLAT LANTAI
PANJANG PONDASI BATU BELAH
TYPE 1
HORIZONTAL 9.85 6.15 5.3 1.5 4 1.5 15.85 5.85 3.65 1.15 2.5 1.85 2.5 1.5 = 63.15 112.9 m'
VERTIKAL 14.5 3 6.93 16.93 2 0.8 4.05 1.5 = 49.71

TIPE 2
HORIZONTAL 17 10.85 = 27.85 100.9 m'
VERTIKAL 35 1 37 = 73

TYPE ROLLAG 1
HORIZONTAL 4 9.6 11 1.2 1.2 = 27 65.96 m'
VERTIKAL 13.82 2 2 4.75 4.75 5.82 5.82 = 38.96

TYPE ROLLAG 2
HORIZONTAL = 11.05 12.7 m'
VERTIKAL = 1.65

JUMLAH PONDASI FOOTPLAT


FOOTPLAT TYPE P1 = 3 buah
FOOTPLAT TYPE P2 = 8 buah
FOOTPLAT TYPE P3 = 8 buah

PANJANG SLOOF
TYPE BS1
HORIZONTAL 9.7 6.15 4.15 16 5.85 = 41.85 90.56 m'
VERTIKAL 14.35 6.93 16.93 10.5 = 48.71

TYPE BSP
HORIZONTAL 17 5.45 3.8 2.65 1.3 2 2.65 1.5 1.5 1.5 = 39.35 113.3 m'
VERTIKAL 35 1.15 17.43 8.63 2.15 4.1 1.5 1 1.5 1.5 = 73.96
JUMLAH KOLOM
- KOLOM PEDESTAL
KOLOM TYPE K1 = 15 buah Tinggi Kolom = 2.9 m
KOLOM TYPE KP = 19 buah

- KOLOM PAGAR
KOLOM TYPE KP = 30 buah Tinggi Kolom = 3.45 m

- LANTAI 1
KOLOM TYPE K1 = 15 buah Tinggi Kolom = 3.5 m
KOLOM TYPE KP = 19 buah

- LANTAI 2
KOLOM TYPE K1 = 15 buah Tinggi Kolom = 4m
KOLOM TYPE KP = 21 buah

- LANTAI 3
KOLOM TYPE K1 = 15 buah Tinggi Kolom = 3.5 m
KOLOM TYPE KP = 14 buah

PANJANG BALOK
- LANTAI 2
TYPE B(25x55)
HORIZONTAL 3.85 = 3.85 32.55 m'
VERTIKAL 14.35 14.35 = 28.7
TYPE B(25x50)
HORIZONTAL 9.7 15.7 15.7 11.85 11.85 = 64.8 98.6 m'
VERTIKAL 1.35 2.45 16.85 13.15 = 33.8

TYPE B(20x40)
HORIZONTAL 11.85 3.85 1.35 = 17.05 52.9 m'
VERTIKAL 1.5 4.35 16.85 13.15 = 35.85

- LANTAI 3
TYPE B(25x55)
HORIZONTAL 3.85 = 3.85 32.55 m'
VERTIKAL 14.35 14.35 = 28.7

TYPE B(25x50)
HORIZONTAL 9.7 9.7 9.7 5.85 5.85 = 40.8 61.5 m'
VERTIKAL 1.35 2.5 16.85 = 20.7

TYPE B(20x40)
HORIZONTAL 3.85 5.85 = 9.7 30.9 m'
VERTIKAL 4.35 16.85 = 21.2

TYPE RB(20x40)
HORIZONTAL 6 6 = 12 18.3 m'
VERTIKAL 6.3 = 6.3

TYPE RB(15x30)
VERTIKAL 4.35 = 4.35 4.35 m'
- RING BALK
TYPE RB(20x40)
HORIZONTAL 5.85 5.85 5.85 5.85 = 23.4 43.4 m'
VERTIKAL 3.7 3.7 6.3 6.3 = 20

TYPE RB(15x30)
HORIZONTAL 3.85 3.85 3.85 3.85 = 15.4 24.1 m'
VERTIKAL 4.35 4.35 = 8.7

TYPE RB(15x20)
HORIZONTAL 5.85 5.85 = 11.7 16.7 m'
VERTIKAL 2.5 2.5 = 5

TYPE RB(15/15) PAGAR


HORIZONTAL 11 17 = 28 68.93 m'
VERTIKAL 1 35 4.93 = 40.93

TYPE RB(15/15) KOLAM


HORIZONTAL 4 8.95 1.1 1.1 = 15.15 50.03 m'
VERTIKAL 13.58 4.75 4.75 5.9 5.9 = 34.88

LUAS PLAT LANTAI


- PLAT LANTAI 2 - PLAT DAK ATAP
LUAS 1 9.98 3.95 = 39.42 m² LUAS 1 2.27 5.7 = 12.94 m²
LUAS 2 12.1 13.15 = 159.1 m²
LUAS 3 3.85 5.95 = 22.91 m²
LUAS 4 1.45 1.3 = 1.885 m²
223.3 m²
- PLAT LANTAI 3
LUAS 1 3.95 3.85 = 15.21 m²
LUAS 2 6.1 17.1 = 104.3 m²
LUAS 3 3.85 5.95 = 22.91 m²
142.4 m²

- PLAT GAZEBO
LUAS 1 4.15 4.15 = 17.22 m²
LUAS 2 1.5 4.42 = 6.63 m²
LUAS 3 1.5 1.73 = 2.595 m²
26.45 m²

LUBANG PINTU DAN JENDELA

KUSEN TYPE J1 = 1.7 2.9 = 4.93 m²


KUSEN TYPE J2 = 1.1 2.9 = 3.19 m²
KUSEN TYPE J3 = 3.2 2.35 = 7.52 m²
KUSEN TYPE J4 = 1.1 2 = 2.2 m² LANTAI 1 = 51.54 m²
KUSEN TYPE J5 = 2.15 2 = 4.3 m² LANTAI 2 = 56.95 m²
KUSEN TYPE J6 = 1.1 9.7 = 10.67 m² LANTAI 3 = 59.03 m²
KUSEN TYPE J7 = 5.2 2.4 = 12.48 m²

KUSEN TYPE PJ1 = 3.2 2.9 = 9.28 m²


KUSEN TYPE PJ2 = 3 3 = 9 m²
KUSEN TYPE PJ3 = 5.1 2.9 = 14.79 m²
KUSEN TYPE PJ4 = 2.9 3.35 = 9.715 m²
KUSEN TYPE P1 = 0.9 2.15 = 1.935 m²
KUSEN TYPE P2 = 0.8 2.15 = 1.72 m²

KUSEN TYPE BV = 0.5 0.6 = 0.3 m²


KUSEN TYPE BV1 = 0.5 1.1 = 0.55 m²
92.58 m²

PANJANG DINDING

- LANTAI 1
HORIZONTAL 10 1.5 3.85 1.5 6.15 10 3.65 4.35 2.5 1.5 = 45 m' 103 m'
VERTIKAL 14.37 4.35 3 14.37 14.37 2.08 0.95 3 1.5 = 57.99 m'

- PAGAR
HORIZONTAL 17 11 = 28 85.43 m'
VERTIKAL 35 17.43 5 = 57.43

- TERAS
HORIZONTAL 6 = 6 10.86 m'
VERTIKAL 2.43 2.43 = 4.86

- KOLAM IKAN
HORIZONTAL 4 8.95 1.1 1.1 = 15.15 50.03 m'
VERTIKAL 13.58 4.75 4.75 5.9 5.9 = 34.88

- DINDING ELEVASI
HORIZONTAL 5.3 m'
- LANTAI 2
HORIZONTAL 5.85 4 1.5 4 1.85 2.5 4.08 4 4 3.85 2 9.7 = 47.33 116.9 m'
VERTIKAL 15.7 1.5 6.85 3.7 3.7 16.85 2 6.08 13.15 = 69.53

- LANTAI 3
HORIZONTAL 9.7 2 3.85 4 3.85 4 1.85 3.87 5.58 1.5 = 40.2 92.74 m'
VERTIKAL 15.7 1.5 6.93 2.08 16.93 3.7 3.7 2 = 52.54

TRASRAM KM
-LANTAI 1
KM TYPE 1
HORIZONTAL 1.5 1.5 = 3 6 x 3 = 18 m'
VERTIKAL 1.5 1.5 = 3

-LANTAI 2
KM TYPE 1
HORIZONTAL 1.5 1.5 = 3 6 m'
VERTIKAL 1.5 1.5 = 3

KM TYPE 2
HORIZONTAL 2.5 2.5 = 5 9 m'
VERTIKAL 2 2 = 4

KM TYPE 3
HORIZONTAL 2 2 = 4 = 8 m'
VERTIKAL 2 2 = 4
-LANTAI 3
KM TYPE 1
HORIZONTAL 1.5 1.5 = 3 = 6 m'
VERTIKAL 1.5 1.5 = 3

KM TYPE 3
HORIZONTAL 2 2 = 4 = 8 m'
VERTIKAL 2 2 = 4

PAS. KERAMIK DINDING

- Lantai 1
Dinding KM Type 1 4.7 3 = 14.1 m'

- Lantai 2
Dinding KM Type 1 4.7 m'
Dinding KM Type 2 7.7 m'
Dinding KM Type 3 6.7 m'

- Lantai 3
Dinding KM Type 1 4.7 m'
Dinding KM Type 3 6.7 m'
PEKERJAAN LANTAI
-LANTAI 1
PAS. PAVING BLOCK 6 17.43 = 104.6 m²
PAS. KERAMIK GARASI (40X40) 1.8 1.5 = 2.7 m²
1.85 0.85 = 1.573 m² - LANTAI 1
2.2 2.15 = 4.73 m²
7 5.85 = 40.95 m² JUMLAH PASANGAN KRAMIK (40X40) = 214.0 m²
49.95 m² JUMLAH PASANGAN KRAMIK (30X30) = 31.682 m²
PAS. KERAMIK K. TDR TAMU(40X40) 2.35 1.5 = 3.525 m² JUMLAH PASANGAN KRAMIK (20X20) = 5.4675 m²
3.85 2.85 = 10.97 m² JUMLAH PASANGAN PARKET = 17.223 m²
14.5 m²
PAS. KERAMIK TERAS (40X40) 6 2.43 = 14.58 m²
PAS. KERAMIK R. TAMU (40X40) 5.7 4.35 = 24.8 m²
PAS. KERAMIK R. KELUARGA (40X40) 4.5 1.5 = 6.75 m²
2.9 1.55 = 4.495 m²
2.5 4.45 = 11.13 m²
5.7 4.6 = 26.22 m²
48.59 m²
PAS. KERAMIK R. MAKAN (40X40) 5.85 3.85 = 22.52 m²
5.3 1.55 = 8.215 m²
30.74 m²
PAS. KERAMIK R. DAPUR (40X40) 3.85 3.7 = 14.25 m²
PAS. KERAMIK TERAS B. (40X40) 5.2 1.65 = 8.58 m²
5.35 1.5 = 8.025 m²
16.61 m²
PAS. KERAMIK T. CUCI. (30X30) 1.8 1.35 = 2.43 m²
2.85 1.35 = 3.848 m²
2.2 1.85 = 4.07 m²
2.85 1.5 = 4.275 m²
14.62 m²
PAS. KERAMIK K. PRT (30X30) 2.84 2.35 = 6.674 m²
PAS. KERAMIK MUSHOLLA (30X30) 2.85 2.5 = 7.125 m²
0.95 2 = 1.9 m²
9.025 m²
PAS. KERAMIK KM (20X20) 1.35 1.35 = 5.468 m²
PAS. KERAMIK T. WUDHU (30X30) 1.7 0.8 = 1.36 m²
PAS. PARKET GAZEBO 4.15 4.15 = 17.22 m²

-LANTAI 2
PAS. KERAMIK BALKON 1 (40X40) 5.7 1.08 = 6.156 m² - LANTAI 2
PAS. KERAMIK BALKON 2 (40X40) 3.85 1.05 = 4.043 m²
PAS. KERAMIK K. T. UTAMA (40X40) 5.7 3.55 = 20.24 m² JUMLAH PASANGAN KRAMIK (40X40) = 117.6 m²
1.85 0.8 = 1.48 m² JUMLAH PASANGAN KRAMIK (20X20) = 10.17 m²
1.95 1.35 = 2.633 m² JUMLAH PASANGAN PARKET = 42.045 m²
24.35 m²
PAS. KERAMIK K. TIDUR 1 (40X40) 3.85 2.85 = 10.97 m²
2.35 1.5 = 3.525 m²
14.5 m²
PAS. KERAMIK K. TIDUR 2 (40X40) 3.85 3.7 = 14.25 m²
PAS. KERAMIK K. TIDUR 3 (40X40) 3.7 3.7 = 13.69 m²
PAS. KERAMIK R. KEL (40X40) 6 3.98 = 23.88 m²
9.05 1.85 = 16.74 m²
40.62 m²
PAS. KERAMIK KM 2 (20X20) 2.35 1.85 = 4.348 m²
PAS. KERAMIK KM 1 (20X20) 1.35 1.35 = 1.823 m²
PAS. KERAMIK KM 3 (20X20) 2 2 = 4 m²
PAS. PARKET KAYU ROOF GARDEN 6 2.5 = 15 m²
8.2 1.725 = 14.15 m²
2.15 6 = 12.9 m²
42.05 m²
-LANTAI 3 - LANTAI 3
PAS. KERAMIK PERPUS (40X40) 3.85 2.05 = 7.893 m²
1.75 0.8 = 1.4 m² JUMLAH PASANGAN KRAMIK (40X40) = 116.5 m²
5.65 3.55 = 20.06 m² JUMLAH PASANGAN KRAMIK (20X20) = 5.8225 m²
29.35 m²
PAS. KERAMIK BALKON 1 (40X40) 3.85 1.05 = 4.043 m²
PAS. KERAMIK R. KELUARGA (40X40) 1.85 1.85 = 3.423 m²
6 5.84 = 35.04 m²
1.85 1.2 = 2.22 m²
40.68 m²
PAS. KERAMIK K. TIDUR 1 (40X40) 2.35 1.5 = 3.525 m²
3.85 2.85 = 10.97 m²
14.5 m²
PAS. KERAMIK K. TIDUR 2 (40X40) 3.7 3.7 = 13.69 m²
PAS. KERAMIK GUDANG (40X40) 3.7 3.85 = 14.25 m²
PAS. KERAMIK KM 1 (20X20) 1.35 1.35 = 1.823 m²
PAS. KERAMIK KM 3 (20X20) 2 2 = 4 m²

PEKERJAAN PLAFOND
PLAFOND
- LANTAI 1 50.26 8.825 6.653 1.823 98.43 14.43 1.823 1.823 = 184.1 m²
- LANTAI 2 24.25 4.325 14.82 24.52 14.2 3.4 13.65 14.43 1.823 = 115.4 m²
- LANTAI 3 29.25 63.62 14.2 3.4 13.65 14.43 1.823 = 140.4 m²

LIST PLAFOND
- LANTAI 1 35.6 12.7 10.7 5.4 56.5 16.4 5.4 5.4 = 148.1 m'
- LANTAI 2 24.4 8.4 15.4 24.1 15.1 7.4 14.8 16.4 5.4 = 131.4 m'
- LANTAI 3 24.4 37.85 15.1 7.4 14.8 16.4 5.4 = 121.4 m'
PEKERJAAN KAYU

KAYU PAGAR ROOF GARDEN


HORIZONTAL 6/12 10.4 x 16 = 166.4 m' x 0.007 = 1.324 m³
5.85 x 3 = 17.55 m'
VERTIKAL 6/12 3.1 x 34 = 105.4 m' x 0.007 = 0.759 m³
289 2.083 m³

PEKERJAAN BAJA
KUDA-KUDA TYPE K
2L.60.60.6 1.36 1.38 1.42 1.39 1.36 1.38 1.42 1.39 = 33.3 m'
2L.50.50.5 2.51 2.36 1.39 1.67 2.59 2.73 3.28 2.51 2.36 1.39 1.67 2.59 2.73 = 89.34 m'
JARUM GORDING Ø10 mm 1.38 x 8 x 3 = 33.12 m'

KUDA-KUDA TYPE J
2L.60.60.6 2.51 2.56 2.45 = 30.08 m'
2L.50.50.5 3.42 3.09 2.19 2.4 1.06 6.92 = 76.32 m'
JARUM GORDING Ø10 mm 1.85 x 4 x 4 = 29.6 m'

KUDA-KUDA TYPE k'


1.36
2L.60.60.6 1.38 1.42 1.39 4.62 1.36 1.38 1.42 1.39 = 15.72 m'
2.51
2L.50.50.5 2.36 1.39 1.67 2.59 2.73 3.28 3.28 2.51 2.36 1.39 1.67 2.59 2.73 2.23 = 56.33 m'
2.27 3.95 1.91 1.91 3.23 3.95 1.91 1.91
JARUM GORDING Ø10 mm 1.38 x 8 = 11.04 m'
GORDING
MELINTANG
2C.125.50.20.2,3 9.7 7.28 4.85 2.43 9.7 7.28 4.85 2.43 = 48.52 m'
MEMANJANG
2C.125.50.20.2,3 14.35 11.93 9.5 7.08 14.35 11.93 9.5 7.08 = 85.72 m'
NOK
2C.125.50.20.2,3 4.65 = 4.65 m'

LISTPLANG 16.1 16.1 14.45 14.45 = 61.1 m'

BUBUNGAN 4.65 8.75 8.75 8.75 8.75 = 39.65 m'

ATAP 0.5 12.29 6.99 = 43 x 2 = 85.91 m²


0.5 4.59 15.94 6.99 = 71.75 x 2 = 143.5 m²
229.4 m²
1. RENCANA ANGGARAN BIAYA
A. PERHITUNGAN VOLUME PEKERJAAN

PEKERJAAN : PEMBANGUNAN RUMAH 3 LANTAI


LOKASI : JL. WOLTER MONGINSIDI, NO. 23, SEMARANG

NO. URAIAN PEKERJAAN RINCIAN VOLUME (M

1 2 3 4 5 6

I PEKERJAAN PERSIAPAN
a. Pembersihan Lahan
Luas lahan :
3700 17.00 x 37.00

1700

b. Pembuatan Pagar Keliling Sementara

Keliling :
19.00 + 39.00 x 2.00
3900

1900

c. Pembuatan Gudang Bahan / Perlengkapan

Page 101 of 368


NO. URAIAN PEKERJAAN RINCIAN VOLUME (M

1 2 3 4 5 6

Luas :
300
3.00 x 3.00

300
d. Pembuatan Bowplank
Keliling :
18.00 + 38.00 x 2.00
3800

1800

e. Listrik Penerangan Proyek


f. Air Kerja Proyek
g. Papan Nama Proyek

Page 102 of 368


NO. URAIAN PEKERJAAN RINCIAN VOLUME (M

1 2 3 4 5 6

II PEKERJAAN TANAH
a. Galian Tanah Pondasi
1. Galian Tanah Pondasi Footplat (P1)
VOLUME :
1.95 x 1.90 x 1.9 x 3.00

2. Galian Tanah Pondasi Footplat (P2)


VOLUME :
2.40 x 2.40 x 1.95 x 8.00

3. Galian Tanah Pondasi Footplat (P3)


VOLUME :
1.95 x 1.90 x 1.90 x 8.00

4. Galian Tanah Pondasi Footplat Tangga


VOLUME :
1.50 x 1.00 x 1.05 x 1.00

Page 103 of 368


NO. URAIAN PEKERJAAN RINCIAN VOLUME (M

1 2 3 4 5 6

JUMLAH TOTAL VOLUM

5. Galian Tanah Pondasi Batu Belah Type 1


VOLUME :
1.28 x 112.86

6. Galian Tanah Pondasi Batu Belah Type 2


VOLUME :
1.28 x 100.85

Page 104 of 368


NO. URAIAN PEKERJAAN RINCIAN VOLUME (M

1 2 3 4 5 6

7. Galian Tanah Rollag Batu Belah


VOLUME :
0.45 x 0.40 x 65.96

JUMLAH TOTAL VOLUME

b. Urugan Peninggian Tanah VOLUME :


1. Peninggian Carport 101.94 x 0.45 = 45.87 m³
2. Peninggian Taman Depan 53.91 x 1.20 = 64.69 m³
3. Peninggian Teras Depan 14.55 x 1.35 = 19.64 m³
4. Peninggian Kolam Ikan 107.97 x 0.80 = 86.37 m³
5. Peninggian Ruang Tidur Tamu 14.43 x 1.40 = 20.20 m³
6. Peninggian Ruang Keluarga 48.59 x 1.40 = 68.03 m³
7. Peninggian KM 1 1.82 x 1.35 = 2.46 m³
8. Peninggian Dapur 14.25 x 0.75 = 10.68 m³
9. Peninggian Ruang Makan 30.15 x 0.75 = 22.61 m³
10. Peninggian Garasi 49.95 x 0.60 = 29.97 m³
11. Peninggian Musholla 9.13 x 0.75 = 6.84 m³
12. Peninggian Riang Tidur PRT 6.70 x 0.65 = 4.35 m³
13. Peninggian Teras Belakang 16.25 x 0.45 = 7.31 m³
14. Peninggian Tempat Jemur 10.35 x 0.35 = 3.62 m³
15. Peninggian Tempat Cuci 4.28 x 0.35 = 1.50 m³
16. Peninggian KM 2 1.82 x 0.60 = 1.09 m³
17. Peninggian Taman Belakang 73.84 x 0.30 = 22.15 m³

JUMLAH
c. Urugan Pasir Bawah Lantai
1. Peninggian Carport 101.94 x 0.10 = 10.19 m³
2. Peninggian Teras Depan 14.55 x 0.05 = 0.73 m³
3. Peninggian Kolam Ikan 107.97 x 0.10 = 10.80 m³
4. Peninggian Ruang Tidur Tamu 14.43 x 0.10 = 1.44 m³
5. Peninggian Ruang Keluarga 48.59 x 0.10 = 4.86 m³
6. Peninggian KM 1 1.82 x 0.10 = 0.18 m³
7. Peninggian Dapur 14.25 x 0.10 = 1.42 m³
8. Peninggian Ruang Makan 30.15 x 0.10 = 3.02 m³
9. Peninggian Garasi 49.95 x 0.10 = 5.00 m³
10. Peninggian Musholla 9.13 x 0.10 = 0.91 m³
11. Peninggian Riang Tidur PRT 6.70 x 0.10 = 0.67 m³
12. Peninggian Teras Belakang 16.25 x 0.10 = 1.62 m³

Page 105 of 368


NO. URAIAN PEKERJAAN RINCIAN VOLUME (M

1 2 3 4 5 6

13. Peninggian Tempat Jemur 10.35 x 0.10 = 1.03 m³


14. Peninggian Tempat Cuci 4.28 x 0.10 = 0.43 m³
15. Peninggian KM 2 1.82 x 0.10 = 0.18 m³

JUMLAH TOTAL VO
d. Urugan Pasir Bawah Pondasi
1. Urugan Pasir Bawah Pondasi Type 1 0.10 x 112.86 = 11.29
2. Urugan Pasir Bawah Pondasi Type 2 0.06 x 100.85 = 6.00
3. Urugan Pasir Bawah Pondasi Footplat P1 0.38 x 1.90 x 3.00 = 2.17
4. Urugan Pasir Bawah Pondasi Footplat P2 0.48 x 2.40 x 8.00 = 9.22
5. Urugan Pasir Bawah Pondasi Footplat P3 0.38 x 1.90 x 8.00 = 5.78
6. Urugan Pasir Bawah Pondasi Footplat Tangga 0.10 x 1.50 x 1.00 = 0.15
7. Urugan Pasir Bawah Rollag Belakang 0.015 x 12.70 = 0.19
8. Urugan Pasir Bawah Rollag Kolom Ikan 0.02 x 65.96 = 1.32

JUMLAH TOTAL VOL


e. Urugan Tanah Kembali
1. Urugan Tanah Kembali Pondasi Type 1 144.35 - 83.52 = 60.83 m³
2. Urugan Tanah Kembali Pondasi Type 2 128.99 - 47.85 = 81.13 m³
3. Urugan Tanah Kembali Pondasi Footplat P1 21.12 - 2.70 = 18.42 m³
4. Urugan Tanah Kembali Pondasi Footplat P2 46.08 - 12.80 = 33.28 m³
5. Urugan Tanah Kembali Pondasi Footplat P3 29.64 - 7.20 = 22.44 m³
6. Urugan Tanah Kembali Pondasi Footplat Tangga 1.50 - 0.45 = 1.05 m³

JUMLAH TOTAL VOL

Page 106 of 368


NO. URAIAN PEKERJAAN RINCIAN VOLUME (M

1 2 3 4 5 6

III. PEKERJAAN ARSITEKTUR


1. PEKERJAAN PASANGAN PONDASI BATU BELAH
a. Pasangan Pondasi Batu Belah 1:5
1. Pasangan Pondasi Batu Belah Type 1 0.44 x 112.86 = 49.66 m³
2. Pasangan Pondasi Batu Belah Type 2 0.30 x 100.85 = 29.85 m³

JUM
b. Pasangan Aanstamping
1. Pasangan Pondasi Batu Belah Type 1 0.20 x 112.86 = 22.57 m³
2. Pasangan Pondasi Batu Belah Type 2 0.12 x 100.85 = 12.00 m³

JUMLA
c. Pasangan Rollag Batu Kali 1:5
1. Rollag Teras Belakang 0.09 x 12.70 = 1.14 m³
2. Rollag Kolam Ikan 0.16 x 65.96 = 10.55 m³
3. Rollag Trap Tangga 0.30 x 1.50 = 0.45 m³

2. PEKERJAAN PASANGAN DINDING


a. Pasangan Dindang Batu Bata 1 : 5
- Lantai 1
1. Pas. Dinding Lantai 1 102.99 x 4.80 = 494.35 m²
2. Pas. Dinding Pagar 85.43 x 3.15 = 269.10 m²
3. Pas. Dinding Teras 10.86 x 1.00 = 10.86 m²
4. Pas. Dinding Kolam Ikan 50.03 x 1.25 = 62.54 m²
5. Pas. Dinding Elevasi Lantai 5.30 x 1.25 = 6.63 m²
LUBANG JENDELA & PINTU = 51.54
PAS. DINDING 1 : 3 = 27.00

JUMLAH TOTAL
- Lantai 2
1. Pas. Dinding Lantai 2 116.86 x 4.00 = 467.44 m²
LUBANG JENDELA & PINTU = 56.95
PAS. DINDING 1 : 3 = 34.50

JUMLAH TOTAL
- Lantai 3
1. Pas. Dinding Lantai 3 92.74 x 3.50 = 324.59 m²
LUBANG JENDELA & PINTU = 59.03

Page 107 of 368


NO. URAIAN PEKERJAAN RINCIAN VOLUME (M

1 2 3 4 5 6

PAS. DINDING 1 : 3 = 21.00

JUMLAH TOTAL

b. Pasangan Dinding Batu Bata 1 : 3


- Lantai 1
1. Pas. Dinding KM Type 1 18.00 x 1.50 = 27.00 m²

JUMLAH TOTAL
- Lantai 2
1. Pas. Dinding KM Type 1 6.00 x 1.50 = 9.00 m²
2. Pas. Dinding KM Type 2 9.00 x 1.50 = 13.50 m²
3. Pas. Dinding KM Type 3 8.00 x 1.50 = 12.00 m²

JUMLAH TOTAL
- Lantai 3
1. Pas. Dinding KM Type 1 6.00 x 1.50 = 9.00 m²
2. Pas. Dinding KM Type 3 8.00 x 1.50 = 12.00 m²

JUMLAH TOTAL
c. Pas. Dinding Keramik Kamar Mandi
- Lantai 1
1. Pas. Keramik (20x40) Dinding KM Type 1 14.10 x 1.50 = 21.15 m²

JUMLAH TOTAL VOLUME PAS

Page 108 of 368


NO. URAIAN PEKERJAAN RINCIAN VOLUME (M

1 2 3 4 5 6

- Lantai 2
1. Pas. Keramik (20x40) Dinding KM Type 1 4.70 x 1.50 = 7.05 m²
2. Pas. Keramik (20x40) Dinding KM Type 2 7.70 x 1.50 = 11.55 m²
3. Pas. Keramik (20x40) Dinding KM Type 3 6.70 x 1.50 = 10.05 m²

JUMLAH TOTAL VOLUME PAS


- Lantai 3
1. Pas. Keramik (20x40) Dinding KM Type 1 4.70 x 1.50 = 7.05 m²
2. Pas. Keramik (20x40) Dinding KM Type 3 6.70 x 1.50 = 10.05 m²

JUMLAH TOTAL VOLUME PAS


d. Pas. Dinding Keramik Mozaik Kolam Ikan
1. Pas. Dinding Keramik Mozaik Kolam Ikan 43.84 x 0.50 = 21.92 m²
11.85 x 8.65 = 102.50 m²
3.85 x 1.43 = 5.51 m²

JUMLAH TOTAL VOL


e. Pas. Dinding Marmer Pada Fasad
1. Pasangan Dinding Marmer 5.42 x 3.00 = 16.26 m²

JUMLAH TOTAL VOL

f. Pas. Batu Alam


- Lantai 1
1. Pas. Batu Alam 6.84 + 3.89 + 3.83 + 1.89
12.40 + 9.66 + 11.54 + 4.467

JUMLAH TOT
- Lantai 2
1. Pas. Batu Alam

JUMLAH TOT
- Lantai 3
1. Pas. Batu Alam

JUMLAH TOT

e. Plesteran t = 15 mm
- Lantai 1
1. Plesteran Dindang Batu Bata 1 : 5 764.9 x 2.00 = 1529.87 m²
2. Plesteran Dindang Batu Bata 1 : 3 27.0 x 2.00 = 54.00 m²

Page 109 of 368


NO. URAIAN PEKERJAAN RINCIAN VOLUME (M

1 2 3 4 5 6

JUMLAH TOT
JUMLAH TOT
- Lantai 2
1. Plesteran Dindang Batu Bata 1 : 5 376.0 x 2.00 = 751.99 m²
2. Plesteran Dindang Batu Bata 1 : 3 34.5 x 2.00 = 69.00 m²
JUMLAH TOT
JUMLAH TOT
- Lantai 3
1. Plesteran Dindang Batu Bata 1 : 5 286.56 x 2.00 = 573.12 m²
2. Plesteran Dindang Batu Bata 1 : 3 21.0 x 2.00 = 42.00 m²
JUMLAH TOT
JUMLAH TOT
f. Pas. Acian Dinding
- Lantai 1
1. Acian Dindang Batu Bata 1 : 5 1529.87 - 54.51 - 129.93 = 1345.4
2. Acian Dindang Batu Bata 1 : 3 54.00 - 21.15 = 32.85

JU
- Lantai 2
1. Acian Dindang Batu Bata 1 : 5 751.99 - 7.40 = 744.59
2. Acian Dindang Batu Bata 1 : 3 69.00 - 28.65 = 40.35

JU
- Lantai 3
1. Acian Dindang Batu Bata 1 : 5 573.12 - 7.40 - 16.26 = 549.46
2. Acian Dindang Batu Bata 1 : 3 42.00 - 17.10 = 24.90

JU

Page 110 of 368


NO. URAIAN PEKERJAAN RINCIAN VOLUME (M

1 2 3 4 5 6

3. PEKERJAAN LANTAI
a. Pasangan Keramik (40x40)
- Lantai 1
1. Pas. Keramik Garasi 1.80 x 1.50 = 2.70 m²
1.85 x 0.85 = 1.57 m²
2.20 x 2.15 = 4.73 m²
7.00 x 5.85 = 40.95 m²

2. Pas. Keramik K. Tidur Tamu 2.35 x 1.50 = 3.53 m²


3.85 x 2.85 = 10.97 m²

3. Pas. Keramik Teras 6.00 x 2.43 = 14.58 m²


4. Pas. Keramik Ruang Tamu 5.70 x 4.35 = 24.80 m²
5. Pas. Keramik Ruang Keluarga 4.50 x 1.50 = 6.75 m²
2.90 x 1.55 = 4.50 m²
2.50 x 4.45 = 11.13 m²
5.70 x 4.60 = 26.22 m²

6. Pas. Keramik Ruang Makan 5.85 x 3.85 = 22.52 m²


5.30 x 1.55 = 8.22 m²

7. Pas. Keramik Dapur 3.85 x 3.70 = 14.25 m²


8. Pas. Keramik Teras 5.20 x 1.65 = 8.58 m²
5.35 x 1.50 = 8.03 m²

JUMLAH TOTAL VOL


- Lantai 2
1. Pas. Keramik Balkon 1 5.7 x 1.08 = 6.16 m²
2. Pas. Keramik Balkon 2 3.85 x 1.05 = 4.04 m²
3. Pas. Keramik K. T. Utama 5.7 x 3.55 = 20.24 m²
1.85 x 0.8 = 1.48 m²
1.95 x 1.35 = 2.63 m²

4. Pas. Keramik K. Tidur 1 3.85 x 2.85 = 10.97 m²


2.35 x 1.5 = 3.53 m²

5. Pas. Keramik K. Tidur 2 3.85 x 3.7 = 14.25 m²


6. Pas. Keramik K. Tidur 3 3.7 x 3.7 = 13.69 m²
7. Pas. Keramik R. Keluarga 6 x 3.98 = 23.88 m²
9.05 x 1.85 = 16.74 m²

Page 111 of 368


NO. URAIAN PEKERJAAN RINCIAN VOLUME (M

1 2 3 4 5 6

JUMLAH TOTAL VOL


- Lantai 3
1. Pas. Keramik Perpus 3.85 x 2.05 = 7.89 m²
1.75 x 0.8 = 1.40 m²
5.65 x 3.55 = 20.06 m²

2. Pas. Keramik Balkon 1 3.85 x 1.05 = 4.04 m²


3. Pas. Keramik R. Keluarga 1.85 x 1.85 = 3.42 m²
6 x 5.84 = 35.04 m²
1.85 x 1.2 = 2.22 m²

4. Pas. Keramik K. Tidur 1 2.35 x 1.5 = 3.53 m²


3.85 x 2.85 = 10.97 m²

5. Pas. Keramik K. Tidur 2 3.7 x 3.7 = 13.69 m²


6. Pas. Keramik Gudang 3.7 x 3.85 = 14.25 m²

JUMLAH TOTAL VOL

b. Pasangan Keramik (30x30)


- Lantai 1
1.Pas. Keramik T. Cuci 1.8 x 1.35 = 2.43 m²
2.85 x 1.35 = 3.85 m²
2.2 x 1.85 = 4.07 m²
2.85 x 1.5 = 4.28 m²

2. Pas. Keramik K. PRT 2.84 x 2.35 = 6.67 m²


3. Pas. Keramik Musholla 2.85 x 2.5 = 7.13 m²
0.95 x 2 = 1.90 m²

Page 112 of 368


NO. URAIAN PEKERJAAN RINCIAN VOLUME (M

1 2 3 4 5 6

4. Pas. Keramik T. Wudhu 1.7 x 0.8 = 1.36 m²


5. Pas Keramik T. Jemur 1.80 x 1.35 = 2.43 m²
2.80 x 1.35 = 3.78 m²
2.15 x 1.85 = 3.98 m²

JUMLAH TOTAL VOL


c. Pasangan Keramik (20x20)
- Lantai 1
1. Pas. Keramik KM Type 1 1.35 x 1.35 x 3.00 = 5.47

JUMLAH TOTAL VOL


- Lantai 2
1. Pas. Keramik KM Type 1 1.35 x 1.35 = 1.82
2. Pas. Keramik KM Type 2 2.35 x 1.85 = 4.35
3. Pas. Keramik KM Type 3 2 x 2 = 4.00

JUMLAH TOTAL VOL


- Lantai 3
1. Pas. Keramik KM Type 1 1.35 x 1.35 = 1.82
2. Pas. Keramik KM Type 3 2 x 2 = 4.00

JUMLAH TOTAL VOL


d. Pasangan Lantai Parket Kayu
- Lantai 1
1. Pas. Lantai Parket Kayu Gazebo 4.15 x 4.15 = 17.22 m²

JUMLAH TOTAL VOLUM


- Lantai 2
1. Pas. Lantai Parket Kayu Roof Garden 6 x 2.5 = 15.00 m²
8.2 x 1.725 = 14.15 m²
2.15 x 6 = 12.90 m²

JUMLAH TOTAL VOLUM


e. Pasangan Paving Block
- Lantai 1
1. Pas. Paving Block Carport 6 x 17.43 = 104.58 m²

JUMLAH TOTAL V

4. PEKERJAAN PELAFON

Page 113 of 368


NO. URAIAN PEKERJAAN RINCIAN VOLUME (M

1 2 3 4 5 6

a. Plafond Gypsum board t=9 mm + metal frame


1. Lantai 1 184.06 m²
2. Lantai 2 115.41 m²
3. Lantai 3 140.37 m²

JUMLAH TO
JUMLAH TO
JUMLAH TO
b. List tepi plafond profil gypsum
1. Lantai 1 148.10 m'
2. Lantai 2 131.40 m'
3. Lantai 3 121.35 m'

JUMLAH TOTAL
JUMLAH TOTAL
JUMLAH TOTAL
5. PEKERJAAN RAILLING DAN ACP
a. Railling Tangga & void : 0.67 + 3.65 + 2.56 + 4.40

JUMLAH TOTAL VOL


JUMLAH TOTAL VOL

b. Railling gazebo 3.15 x 2.00 + 0.90 x 2.00

JUMLAH T

Page 114 of 368


NO. URAIAN PEKERJAAN RINCIAN VOLUME (M

1 2 3 4 5 6

c. Railling Balkon
- Lantai 1 2.60 + 6.60 = 9.20 m'
- Lantai 2 5.75 + 3.85 = 9.60 m'
- Lantai 3 3.85 = 3.85 m'

JUMLAH TOTAL VOL


JUMLAH TOTAL VOL
JUMLAH TOTAL VOL

d. Pas ACP + Rangka


- Lantai 1 11.85 + 35.60 x 2.50 = 100.85
- Lantai 2 11.55 + 39.5 x 2.5 = 110.30

JUMLAH TOTAL V
JUMLAH TOTAL V

6. PEKERJAAN KAYU
a. Kayu Pagar Vertikal Garden (6/12) 289.35 x 0.01 = 2.08 m³
b. Kayu Atap Gazebo (5/10) 66.50 x 0.05 = 3.33 m³

JUMLA
JUMLA

7. PEKERJAAN KUSEN PINTU DAN JENDELA


a. Kusen Type PJ1
Kusen Pintu dan Jendela
Panjang Vertikal
2.90 + 2.90 + 2.90 + 2.90
Panjang Horizontal
160

3.20 + 1.65 + 1.60


Jumlah Total
Jumlah Kusen PJ1 = 1 Unit

Luasan Kaca
2.70 x 0.60 = 1.62 x 2.00
1.95 x 0.60 = 1.17 x 2.00
1.40 x 0.60 = 0.84 x 1.00
Jumlah Total Luasan Kaca
5

Daun Pintu dan Jendela


Pintu = 2.10 x 0.75 = 1.58

Page 115 of 368


NO. URAIAN PEKERJAAN RINCIAN VOLUME (M

1 2 3 4 5 6

Jendela = 2.75 x 0.75 = 2.06

Engsel Jendela = 7.00 Buah


Kunci Jendela geser = 3.00 Buah
Engsel Pintu = 6.00 Buah
Kunci pintu tanam = 1.00 Buah

b. Kusen Type Pj2


Kusen Pintu dan Jendela
Panjang Vertikal
3.00 + 3.00 + 3.00 + 3.00
Panjang Horizontal
3.00 + 0.90 + 2.15 + 2.15
Jumlah Total
215 Jumlah Kusen PJ2 = 1 Unit

Luasan Kaca
1.43 x 1.00 = 1.43 x 2.00
1.33 x 0.90 = 1.20 x 2.00
0.80 x 0.80 = 0.64 x 1.00
1.94 x 0.40 = 0.78 x 1.00

90
Jumlah Total Luasan Kaca

Daun Pintu dan Jendela


Pintu = 2.02 x 0.80 = 1.62
Jendela = 1.30 x 1.00 = 1.30

Engsel Jendela = 4.00 Buah


Kunci Jendela geser = 2.00 Buah
Engsel Pintu = 3.00 Buah
Kunci pintu tanam = 1.00 Buah

Page 116 of 368


NO. URAIAN PEKERJAAN RINCIAN VOLUME (M

1 2 3 4 5 6

c. Kusen Type PJ3


Kusen Pintu dan Jendela
Panjang Vertikal
2.90 + 2.90 + 2.90 + 2.90
Panjang Horizontal
5.10 + 2.15 + 2.15 + 0.90
Jumlah Total
Jumlah Kusen PJ3 = 1 Unit

Luasan Kaca
2.70 x 0.90 = 2.43 x 4.00
0.70 x 0.60 = 0.42 x 1.00
1.94 x 0.64 = 1.24 x 1.00
Jumlah Total Luasan Kaca

Daun Pintu dan Jendela


Pintu = 2.10 x 0.80 = 1.68
Jendela = 2.80 x 1.00 = 2.80
Jendela = 0.80 x 0.70 = 0.56

Engsel Jendela = 14.00 Buah


Kunci Jendela geser = 9.00 Buah
Engsel Pintu = 3.00 Buah
Kunci pintu tanam = 1.00 Buah

4. Kusen Type PJ4


Kusen Pintu dan Jendela
Panjang Vertikal
2.90 + 2.90 + 2.90 + 2.90
Panjang Horizontal
3.55 + 3.55 + 2.70
Jumlah Total
Jumlah Kusen PJ4 = 1 Unit

Luasan Kaca
1.00 x 0.70 = 0.7 x 2.00
1.95 x 0.90 = 1.76 x 2.00
0.70 x 0.50 = 0.35 x 1.00
270
2.05 x 0.50 = 1.03 x 1.00
0.80 x 0.70 = 0.56 x 1.00
1.94 x 0.64 = 1.24 x 1.00

Page 117 of 368


NO. URAIAN PEKERJAAN RINCIAN VOLUME (M

1 2 3 4 5 6

Jumlah Total Luasan Kaca

Daun Pintu dan Jendela


Pintu = 2.10 x 0.80 = 1.68
Jendela = 2.05 x 1.00 = 2.05

Engsel Jendela = 6.00 Buah


Kunci Jendela geser = 4.00 Buah
Engsel Pintu = 3.00 Buah
Kunci pintu tanam = 1.00 Buah

Page 118 of 368


NO. URAIAN PEKERJAAN RINCIAN VOLUME (M

1 2 3 4 5 6

5. Kusen Type J1
Kusen Jendela
Panjang Vertikal
2.90 + 2.90 + 2.90
Panjang Horizontal
1.70 + 1.70
Jumlah Total
Jumlah Kusen J1 = 1 Unit

Luasan Kaca
2.70 x 0.68 x 2.00
Jumlah Total Luasan Kaca

Daun Jendela
Jendela = 2.80 x 0.78 = 2.18

Engsel Jendela = 4.00 Buah


Kunci Jendela geser = 2.00 Buah

6. Kusen Type J2
Kusen Jendela
Panjang Vertikal
2.90 + 2.90
Panjang Horizontal
1.10 + 1.10 + 1.10
Jumlah Total
Jumlah Kusen J2 = 1 Unit

Luasan Kaca
1.28 x 0.90 =
1.38 x 1.00 =
Jumlah Total Luasan Kaca

Daun Jendela
Jendela = 1.38 x 1.00 = 1.38

Engsel Jendela = 2.00 Buah


Kunci Jendela geser = 1.00 Buah

Page 119 of 368


NO. URAIAN PEKERJAAN RINCIAN VOLUME (M

1 2 3 4 5 6

7. Kusen Type J3
Kusen Jendela
Panjang Vertikal
2.35 + 2.35 + 2.35 + 2.35
Panjang Horizontal
3.20 + 3.20
Jumlah Total
Jumlah Kusen J3 = 1 Unit

Luasan Kaca
2.15 x 0.90 = 1.94 x 3.00
Jumlah Total Luasan Kaca

Daun Jendela
Jendela = 2.25 x 1.00 = 2.25

Engsel Jendela = 6.00 Buah


Kunci Jendela geser = 3.00 Buah

Page 120 of 368


NO. URAIAN PEKERJAAN RINCIAN VOLUME (M

1 2 3 4 5 6

7. Kusen Type J4
Kusen Jendela
Panjang Vertikal
2.00 + 2.00
Panjang Horizontal
1.10 + 1.10
Jumlah Total
Jumlah Kusen J4 = 1 Unit

Luasan Kaca
1.80 x 0.90 =
Jumlah Total Luasan Kaca

Daun Jendela
Jendela = 1.90 x 1.00 = 1.90

Engsel Jendela = 2.00 Buah


Kunci Jendela geser = 1.00 Buah

8. Kusen J5
Kusen Jendela
Panjang Vertikal
2.00 + 2.00 + 2.00
Panjang Horizontal
2.15 + 2.15
Jumlah Total
Jumlah Kusen J5 = 8 Unit

Luasan Kaca
1.80 x 0.90 = 1.62 x 2.00
Jumlah Total Luasan Kaca

Daun Jendela
Jendela = 1.90 x 1.00 = 1.90

Engsel Jendela = 4.00 Buah


Kunci Jendela geser = 2.00 Buah

9. Kusen Type J6

Page 121 of 368


NO. URAIAN PEKERJAAN RINCIAN VOLUME (M

1 2 3 4 5 6

Panjang Vertikal
9.70 + 9.70
Panjang Horizontal
1.10 x 10.00
Jumlah Total
Jumlah Kusen J6 = 1 Unit

Luasan Kaca
1.21 x 1.00 =
1.00 x 1.00 = 1.00 x 8.00
Jumlah Total Luasan Kaca

10. Kusen Type J7


Panjang Vertikal
2.50 x 12.00
Panjang Horizontal
0.70 x 10.00 + 1.20 x 2.00
Jumlah Total
Jumlah Kusen J6 = 1 Unit

Luasan Kaca
2.40 x 1.00 =
2.40 x 0.60 = 1.44 x 5.00
Jumlah Total Luasan Kaca

Page 122 of 368


NO. URAIAN PEKERJAAN RINCIAN VOLUME (M

1 2 3 4 5 6

11. Kusen Type BV


Kusen BV
Panjang Vertikal
0.50 + 0.50
Panjang Horizontal
0.60 + 0.60
Jumlah Total
Jumlah Kusen BV = 7 Unit

Luasan Kaca
0.50 x 0.40 =
Jumlah Total Luasan Kaca

12. Kusen Type BV 1


Kusen BV
Panjang Vertikal
0.50 + 0.50
Panjang Horizontal
1.10 + 1.10
Jumlah Total
Jumlah Kusen BV1 = 1 Unit

Luasan Kaca
1.00 x 0.40 =
Jumlah Total Luasan Kaca

13. Kusen Type P1


Kusen Pintu
Panjang Vertikal
2.15 + 2.15
Panjang Horizontal
0.90
Jumlah Total
Jumlah Kusen P1 = 12 Unit

Engsel Pintu = 3.00 Buah


Kunci Pintu Tanam = 12 Buah

Daun Pintu
Pintu = 2.10 x 0.80 = 1.68
2,5

Page 123 of 368


NO. URAIAN PEKERJAAN RINCIAN VOLUME (M

1 2 3 4 5 6

2,5

14. Kusen Type P2

Pintu Kamar mandi

Jumlah Total
Jumlah Pintu P2 = 8 Unit

Page 124 of 368


NO. URAIAN PEKERJAAN RINCIAN VOLUME (M

1 2 3 4 5 6

8. PEKERJAAN CAT
a. Pekerjaan Cat Dinding Luar (exterior)
- Lantai 1 764.9 + 27.00 - 54.51 - 129.93
- Lantai 2 376.0 + 28.65 - 7.40
- Lantai 3 286.56 + 21.00 - 7.40

JUMLAH TOTAL VOLUME PEK. CA


JUMLAH TOTAL VOLUME PEK. CA
JUMLAH TOTAL VOLUME PEK. CA

b. Pekerjaan Cat Dinding Dalam (interior)


- Lantai 1 426.7 + 27.00 - 21.15 = 432.52
- Lantai 2 376.0 + 28.65 - 28.7 = 375.99
- Lantai 3 286.6 + 21.00 - 17.1 = 290.46

JUMLAH TOTAL VOLUME PEK. CA


JUMLAH TOTAL VOLUME PEK. CA
JUMLAH TOTAL VOLUME PEK. CA

c. Pekerjaan Cat Kayu (Pelitur)


- Lantai 1 0.36 x 289.35 = 104.17 m²
- Lantai 2 0.30 x 66.50 19.95 m²

JUMLAH TOTAL VOLU


JUMLAH TOTAL VOLU

d. Pekerjaan Cat pelafond


- Lantai 1 184.06 m²
- Lantai 2 115.41 m²
- Lantai 3 140.37 m²

JUMLAH TOTAL
JUMLAH TOTAL
JUMLAH TOTAL

e. Pekerjaan Cat Listplang 61.10 x 0.30 = 18.33 m²

Page 125 of 368


NO. URAIAN PEKERJAAN RINCIAN VOLUME (M

1 2 3 4 5 6

JUMLAH

9. PEKERJAAN PENUTUP ATAP


a. Pas. Bubungan 4.65 + 8.75 + 8.75 = 22.15
8.75 + 8.75 + = 17.5

JUMLAH

b. Pas. Genteng 0.5 x 12.29 x 6.99


0.5 x 4.59 + 15.94 x 6.99

JUMLA

c. Pas. Tempert Glass


- Atap Gazebo 4.75 x 4.75 = 22.56 m²

JUMLAH TOTAL

d. Listplang Kayu (3/30)

IV PEKERJAAN STRUKTUR
1. PEKERJAAN SUB STRUKTUR
a. Lantai Kerja
1. Lantai Kerja Pondasi Footplat (P1) 1.90 x 1.90 x 0.05 x
2. Lantai Kerja Pondasi Footplat (P2) 2.40 x 2.40 x 0.05 x
3. Lantai Kerja Pondasi Footplat (P3) 1.90 x 1.90 x 0.05 x
4. Lantai Kerja pada Lantai 1 164.20 x 0.05

JUMLAH TOTAL VOLUME PE

Page 126 of 368


NO. URAIAN PEKERJAAN RINCIAN VOLUME (M

1 2 3 4 5 6

b. Footplat Tangga PERHITUNGAN STRUKTUR DILIHAT PADA LAMPIRAN


- Beton K-250
- Besi
- Bekesting

c. Footplat Type P1
- Beton K-250
- Besi
- Bekesting

d. Footplat Type P2
- Beton K-250
- Besi
- Bekesting

e. Footplat Type P3
- Beton K-250
- Besi
- Bekesting

f. Kolom Pedestal (40x40)


- Beton K-250
- Besi
- Bekesting

g. Kolom Pedestal (15x15)


- Beton K-225
- Besi
- Bekesting

h. Sloof BS1 (25x40)


- Beton K-250
- Besi
- Bekesting

i. Sloof BSP (15x25)


- Beton K-250
- Besi
- Bekesting

2. PEKERJAAN STRUKTUR ATAS

Page 127 of 368


NO. URAIAN PEKERJAAN RINCIAN VOLUME (M

1 2 3 4 5 6

a. Pekerjaan Lantai 1
- Kolom (40x40)
- Beton K-250
- Besi
- Bekesting

- Kolom (15x15)
- Beton K-225
- Besi
- Bekesting

- Kolom (15x15) Pagar


- Beton K-225
- Besi
- Bekesting

- Ring Balk Pagar (15x15)


- Beton K-225
- Besi
- Bekesting

- Ring Balk Dinding Kolam (15x15)


- Beton K-225
- Besi
- Bekesting

- Tangga Utama
- Beton K-250
- Besi
- Bekesting

Page 128 of 368


NO. URAIAN PEKERJAAN RINCIAN VOLUME (M

1 2 3 4 5 6

- Plat Lantai Gazebo


- Beton K-250
- Besi
- Bekesting

b. Pekerjaan Lantai 2
- Kolom (40x40)
- Beton K-250
- Besi
- Bekesting

- Kolom (15x15)
- Beton K-225
- Besi
- Bekesting

- Balok (25x55)
- Beton K-250
- Besi
- Bekesting

- Balok (25x50)
- Beton K-250
- Besi
- Bekesting

- Balok (20x40)
- Beton K-250
- Besi
- Bekesting

- Tangga
- Beton K-250
- Besi
- Bekesting

- Plat Lantai 2
- Beton K-250
- Besi
- Bekesting

Page 129 of 368


NO. URAIAN PEKERJAAN RINCIAN VOLUME (M

1 2 3 4 5 6

c. Pekerjaan Lantai 3
- Kolom (40x40)
- Beton K-250
- Besi
- Bekesting

- Kolom (15x15)
- Beton K-225
- Besi
- Bekesting

- Balok (25x55)
- Beton K-250
- Besi
- Bekesting

- Balok (25x50)
- Beton K-250
- Besi
- Bekesting

- Balok (20x40)
- Beton K-250
- Besi
- Bekesting

Page 130 of 368


NO. URAIAN PEKERJAAN RINCIAN VOLUME (M

1 2 3 4 5 6

- Balok RB (20x40)
- Beton K-250
- Besi
- Bekesting

- Balok RB (15x30)
- Beton K-250
- Besi
- Bekesting

- Plat Lantai 3
- Beton K-250
- Besi
- Bekesting

- Plat Dak Atap


- Beton K-250
- Besi
- Bekesting

d. Pekerjaan Rink Balk


- Balok RB (20x40)
- Beton K-250
- Besi
- Bekesting

- Balok RB (15x30)
- Beton K-250
- Besi
- Bekesting

e. Pekerjaan Atap
- Kuda-kuda Type K
- 2L.60.60.6 33.30 x 10.85
- 2L.50.50.5 89.34 x 7.54
- Jarum Gording Ø10 mm 33.12 x 0.617

- Kuda-kuda Type K'


- 2L.60.60.6 15.72 x 10.85
- 2L.50.50.5 56.33 x 7.54
- Jarum Gording Ø10 mm 11.04 x 0.617

Page 131 of 368


NO. URAIAN PEKERJAAN RINCIAN VOLUME (M

1 2 3 4 5 6

- Kuda-kuda Type J
- 2L.60.60.6 30.08 x 10.85
- 2L.50.50.5 76.32 x 7.54
- Jarum Gording Ø10 mm 29.60 x 0.617

- Gording (2C.125.50.20.2,3) 134.24 x 26.86

- Nok (2C.125.50.20.2,3) 4.65 x 26.86

V PEKERJAAN MEP
- Pekerjaan Mekanikal Elektrikal
1. Pekerjaan Penerangan
a. Lampu TL Balk 1 X 36 Watt
- Lantai 1 7.00 Titik
- Lantai 2 1.00 Titik
- Lantai 3 1.00 Titik

b. Lampu Down Light E27 Ess 18 Watt


- Lantai 1 11.00 Titik
- Lantai 2 19.00 Titik
- Lantai 3 8.00 Titik

c. Lampu Down Light E27 Ess 8 Watt


- Lantai 1 11.00 Titik
- Lantai 2 19.00 Titik
- Lantai 3 8.00 Titik

Page 132 of 368


NO. URAIAN PEKERJAAN RINCIAN VOLUME (M

1 2 3 4 5 6

d. Lampu Baret E27 Ess 18 Watt


- Lantai 1 2.00 Titik
- Lantai 2 - Titik
- Lantai 3 - Titik

2. Pekerjaan Stop kontak 16A.200W.1PH


a. Pek. Stopkontack
- Lantai 1 11.00 Buah
- Lantai 2 9.00 Buah
- Lantai 3 7.00 Buah

3. Pekerjaan Stop kontak 16A.200W.2PH


a. Pek. Stopkontack
- Lantai 1 1.00 Buah
- Lantai 2 1.00 Buah
- Lantai 3 - Buah

4. Pekerjaan Istalasi AC
a. Pekerjaan Indor Unit Ac /Wall Mounted Type
- Lantai 1 3.00 Unit
- Lantai 2 5.00 Unit
- Lantai 3 3.00 Unit

5. Pekerjaan Ceiling Exhaust fan


a. Pekerjaan Ceiling Exhaust fan
- Lantai 1 3.00 Buah
- Lantai 2 3.00 Buah
- Lantai 3 2.00 Buah

6. Pekerjaan Saklar Tunggal


a. Pekerjaan Saklar Tunggal
- Lantai 1 9.00 Buah
- Lantai 2 9.00 Buah
- Lantai 3 6.00 Buah

7. Pekerjaan Saklar Ganda


a. Pekerjaan Saklar Tunggal
- Lantai 1 6.00 Buah
- Lantai 2 4.00 Buah
- Lantai 3 3.00 Buah

Page 133 of 368


NO. URAIAN PEKERJAAN RINCIAN VOLUME (M

1 2 3 4 5 6

8. Pekerjaan Saklar Tukar / Hotel


a. Pekerjaan Saklar Tukar / Hotel
- Lantai 1 1.00 Buah
- Lantai 2 1.00 Buah
- Lantai 3 1.00 Buah

9. Pekerjaan Kabel NYM 2 x 2.5


a. Pekerjaan Kabel NYM 2 x 2.5
- Lantai 1 155.00 m'
- Lantai 2 155.00 m'
- Lantai 3 130.00 m'

- Pekerjaan Sanitasi
1. Pekerjaan Pas. Closet duduk
a. Pekerjaan Pas. Closet duduk
- Lantai 1 3.00 Buah
- Lantai 2 3.00 Buah
- Lantai 3 2.00 Buah

2. Pekerjaan Pas. Bathtup


a. Pekerjaan Pas. Bathtup
- Lantai 1 - Buah
- Lantai 2 1.00 Buah
- Lantai 3 - Buah

Page 134 of 368


NO. URAIAN PEKERJAAN RINCIAN VOLUME (M

1 2 3 4 5 6

3. Pekerjaan Pas. Kran Air


a. Pekerjaan Pas. Kran Air
- Lantai 1 6.00 Buah
- Lantai 2 3.00 Buah
- Lantai 3 2.00 Buah

4. Pekerjaan Pas. Floor Drain


a. Pekerjaan Pas. Floor Drain
- Lantai 1 3.00 Buah
- Lantai 2 3.00 Buah
- Lantai 3 2.00 Buah

5. Pekerjaan Pas. Bak Mandi


a. Pekerjaan Pas. Bak Mandi
- Lantai 1 3.00 Buah
- Lantai 2 2.00 Buah
- Lantai 3 2.00 Buah

6. Pekerjaan pas. Wastafel


a. Pekerjaan pas. Wastafel
- Lantai 1 1.00 Buah
- Lantai 2 1.00 Buah
- Lantai 3 - Buah

7. Pekerjaan Sumur Resapan


a. Pekerjaan Sumur Resapan 2.00 unit

8. Pekerjaan bioseptictank
a. Pekerjaan bioseptictank 1.00 unit

9. Pekerjaan Saluran Air Bersih Pipa Ø 1/2 "


a. Pekerjaan Saluran Air Bersih Pipa Ø 1/2 "
- Lantai 1 57.76 m'
- Lantai 2 33.00 m'
- Lantai 3 26.35 m'

10. Pekerjaan Saluran Air Kotor Pipa Ø 3 "


a. Pekerjaan Saluran Air Kotor Pipa Ø 3 "
- Lantai 1 35.00 m'
- Lantai 2 23.60 m'
- Lantai 3 18.45 m'

Page 135 of 368


NO. URAIAN PEKERJAAN RINCIAN VOLUME (M

1 2 3 4 5 6

11. Pekerjaan Saluran Bioseptictank Pipa Ø 4 "


a. Pekerjaan Saluran Bioseptictank Pipa Ø 4 "
- Lantai 1 41.30 m'
- Lantai 2 51.10 m'
- Lantai 3 38.30 m'

Page 136 of 368


RINCIAN VOLUME (M) VOLUME

7 8 9 10

629.00 m²

116.00 m

Page 137 of 368


RINCIAN VOLUME (M) VOLUME

7 8 9 10

9.00 m²

112.00 m

1.00 ls
1.00 ls
1.00 ls

Page 138 of 368


RINCIAN VOLUME (M) VOLUME

7 8 9 10

= 21.12 m³

= 46.08 m³

= 29.64 m³

= 1.50 m³

Page 139 of 368


RINCIAN VOLUME (M) VOLUME

7 8 9 10

JUMLAH TOTAL VOLUME GALIAN TANAH PONDASI FOOTPLAT= 98.34 m³

= 144.35 m³

= 128.99 m³

Page 140 of 368


RINCIAN VOLUME (M) VOLUME

7 8 9 10

= 11.87 m³

JUMLAH TOTAL VOLUME GALIAN TANAH PONDASI BATU BELAH = 285.21 m³

JUMLAH TOTAL VOLUME PENINGGIAN TANAH = 417.41 m³

Page 141 of 368


RINCIAN VOLUME (M) VOLUME

7 8 9 10

JUMLAH TOTAL VOLUME URUGAN PASIR BAWAH LANTAI = 42.49 m³








JUMLAH TOTAL VOLUME URUGAN PASIR BAWAH PONDASI = 36.10 m³

JUMLAH TOTAL VOLUME URUGAN PASIR BAWAH PONDASI = 217.16 m³

Page 142 of 368


RINCIAN VOLUME (M) VOLUME

7 8 9 10

JUMLAH TOTAL VOLUME PAS. BATU BELAH = 79.51 m³

JUMLAH TOTAL VOLUME PAS. AANSTAMPING = 34.57 m³

JUMLAH TOTAL VOLUME PAS. ROLLAG = 12.14 m³


JUMLAH TOTAL VOLUME PAS. DINDING 1 : 5 LANTAI 1 = 764.94 m²


JUMLAH TOTAL VOLUME PAS. DINDING 1 : 5 LANTAI 2 = 375.99 m²

Page 143 of 368


RINCIAN VOLUME (M) VOLUME

7 8 9 10

JUMLAH TOTAL VOLUME PAS. DINDING 1 : 5 LANTAI 3 = 286.56 m²

JUMLAH TOTAL VOLUME PAS. DINDING 1 : 3 LANTAI 1 = 27.00 m²

JUMLAH TOTAL VOLUME PAS. DINDING 1 : 3 LANTAI 2 = 34.50 m²

JUMLAH TOTAL VOLUME PAS. DINDING 1 : 3 LANTAI 3 = 21.00 m²

JUMLAH TOTAL VOLUME PAS. DINDING KERAMIK (20x40) LANTAI 1 = 21.15 m²

Page 144 of 368


RINCIAN VOLUME (M) VOLUME

7 8 9 10

JUMLAH TOTAL VOLUME PAS. DINDING KERAMIK (20x40) LANTAI 2 = 28.65 m²

JUMLAH TOTAL VOLUME PAS. DINDING KERAMIK (20x40) LANTAI 3 = 17.10 m²

JUMLAH TOTAL VOLUME PAS. DINDING KERAMIK MOZAIK = 129.93 m²

JUMLAH TOTAL VOLUME PAS. DINDING MARMER LANTAI 3 = 16.26 m²

= 16.44 m²
= 38.07 m²

JUMLAH TOTAL VOLUME PAS. BATU ALAM LANTAI 1 = 54.51 m²

= 7.40 m²

JUMLAH TOTAL VOLUME PAS. BATU ALAM LANTAI 2 = 7.40 m²

= 7.40 m²

JUMLAH TOTAL VOLUME PAS. BATU ALAM LANTAI 3 = 7.40 m²

Page 145 of 368


RINCIAN VOLUME (M) VOLUME

7 8 9 10

JUMLAH TOTAL VOLUME PLESTERAN 1 : 4 LANTAI 1 = 1,529.87 m²


JUMLAH TOTAL VOLUME PLESTERAN 1 : 3 LANTAI 1 = 54.00 m²

JUMLAH TOTAL VOLUME PLESTERAN 1 : 4 LANTAI 2 = 751.99 m²


JUMLAH TOTAL VOLUME PLESTERAN 1 : 3 LANTAI 2 = 69.00 m²

JUMLAH TOTAL VOLUME PLESTERAN 1 : 4 LANTAI 3 = 573.12 m²


JUMLAH TOTAL VOLUME PLESTERAN 1 : 3 LANTAI 3 = 42.00 m²


JUMLAH TOTAL VOLUME ACIAN LANTAI 1 = 1,378.29 m²


JUMLAH TOTAL VOLUME ACIAN LANTAI 2 = 784.94 m²


JUMLAH TOTAL VOLUME ACIAN LANTAI 3 = 574.36 m²

Page 146 of 368


RINCIAN VOLUME (M) VOLUME

7 8 9 10

JUMLAH TOTAL VOLUME PAS. KERAMIK (40 X 40) LANTAI 1 = 214.00 m²

Page 147 of 368


RINCIAN VOLUME (M) VOLUME

7 8 9 10

JUMLAH TOTAL VOLUME PAS. KERAMIK (40 X 40) LANTAI 2 = 117.60 m²

JUMLAH TOTAL VOLUME PAS. KERAMIK (40 X 40) LANTAI 3 = 116.51 m²

Page 148 of 368


RINCIAN VOLUME (M) VOLUME

7 8 9 10

JUMLAH TOTAL VOLUME PAS. KERAMIK (30 X 30) LANTAI 1 = 41.87 m²

JUMLAH TOTAL VOLUME PAS. KERAMIK (20 X 20) LANTAI 1 = 5.47 m²



JUMLAH TOTAL VOLUME PAS. KERAMIK (20 X 20) LANTAI 2 = 10.17 m²


JUMLAH TOTAL VOLUME PAS. KERAMIK (20 X 20) LANTAI 3 = 5.82 m²

JUMLAH TOTAL VOLUME PAS. LANTAI PARKET KAYU LANTAI 1 = 17.22 m²

JUMLAH TOTAL VOLUME PAS. LANTAI PARKET KAYU LANTAI 2 = 42.05 m²

JUMLAH TOTAL VOLUME PAS. PAVING BLOCK LANTAI 1 = 104.58 m²

Page 149 of 368


RINCIAN VOLUME (M) VOLUME

7 8 9 10

JUMLAH TOTAL VOLUME PAS. PLAFOND LANTAI 1 = 184.06 m²


JUMLAH TOTAL VOLUME PAS. PLAFOND LANTAI 2 = 115.41 m²
JUMLAH TOTAL VOLUME PAS. PLAFOND LANTAI 3 = 140.37 m²

JUMLAH TOTAL VOLUME PAS. LIST PLAFOND LANTAI 1 = 148.10 m'


JUMLAH TOTAL VOLUME PAS. LIST PLAFOND LANTAI 2 = 131.40 m'
JUMLAH TOTAL VOLUME PAS. LIST PLAFOND LANTAI 3 = 121.35 m'

= 11.28 m'

JUMLAH TOTAL VOLUME PAS. RAILLING TANGGA LANTAI 1 = 11.28 m'


JUMLAH TOTAL VOLUME PAS. RAILLING TANGGA LANTAI 2 = 11.28 m'

= 8.10 m'

JUMLAH TOTAL VOLUME PAS. RAILLING GAZEBO = 8.10 m'

Page 150 of 368


RINCIAN VOLUME (M) VOLUME

7 8 9 10

JUMLAH TOTAL VOLUME PAS. RAILLING BALKON LANTAI 1 = 9.20 m'


JUMLAH TOTAL VOLUME PAS. RAILLING BALKON LANTAI 2 = 9.60 m'
JUMLAH TOTAL VOLUME PAS. RAILLING BALKON LANTAI 3 = 3.85 m'


JUMLAH TOTAL VOLUME PAS. ACP + RANGKA LANTAI 1 = 100.85 m²


JUMLAH TOTAL VOLUME PAS. ACP + RANGKA LANTAI 2 = 110.30 m²

JUMLAH TOTAL VOLUME PAS. KAYU LANTAI 1 = 3.33 m³


JUMLAH TOTAL VOLUME PAS. KAYU LANTAI 2 = 2.08 m³

= 11.60 m'

= 6.45 m'
18.05 m'
18.05 m'

= 3.24 m²
= 2.34 m²
= 0.84 m²
= 6.42 m²

x 2.00 = 3.15 m²

Page 151 of 368


RINCIAN VOLUME (M) VOLUME

7 8 9 10

x 2.00 = 4.13 m²

12.00 m'

8.20 m'
20.20 m'
20.20 m'

= 2.86 m²
= 2.39 m²
= 0.64 m²
= 0.78 m²
= 6.67 m²

x 1.00 = 1.62 m²
x 2.00 = 2.60 m²

Page 152 of 368


RINCIAN VOLUME (M) VOLUME

7 8 9 10

+ 2.90 + 2.90 17.40 m'

10.30 m'
27.70 m'
27.70 m'

= 9.72 m²
= 0.42 m²
= 1.24 m²
= 11.38 m²

x 1.00 = 1.68 m²
x 4.00 = 11.20 m²
x 1.00 = 0.56 m²

+ 2.90 14.50 m'

9.80 m'
24.30 m'
24.30 m'

= 1.40 m²
= 3.51 m²
= 0.35 m²
= 1.03 m²
= 0.56 m²
= 1.24 m²

Page 153 of 368


RINCIAN VOLUME (M) VOLUME

7 8 9 10

= 8.09 m²

x 1.00 = 1.68 m²
x 2.00 = 4.10 m²

Page 154 of 368


RINCIAN VOLUME (M) VOLUME

7 8 9 10

8.70 m'

3.40 m'
12.10 m'
12.10 m'

= 3.67 m²
= 3.67 m²

x 2.00 = 4.37 m²

5.80 m'

3.30 m'
9.10 m'
9.10 m'

= 1.15 m²
= 1.38 m²
= 2.53 m²

x 1.00 = 1.38 m²

Page 155 of 368


RINCIAN VOLUME (M) VOLUME

7 8 9 10

9.40 m'

6.40 m'
15.80 m'
15.80 m'

= 5.81 m²
= 5.81 m²

x 3.00 = 6.75 m²

Page 156 of 368


RINCIAN VOLUME (M) VOLUME

7 8 9 10

4.00 m'

2.20 m'
6.20 m'
6.20 m'

= 1.62 m²
= 1.62 m²

x 1.00 = 1.90 m²

6.00 m'

4.30 m'
10.30 m'
82.40 m'

= 3.24 m²
= 3.24 m²

x 2.00 = 3.80 30.40 m²

x 8.00 = 32.00 Buah

Page 157 of 368


RINCIAN VOLUME (M) VOLUME

7 8 9 10

19.40 m'

11.00 m'
30.40 m'
30.40 m'

= 1.21 m²
= 8.00 m²
= 9.21 m²

30.00 m'

9.40 m'
39.40 m'
39.40 m'

= 2.40 m²
= 7.20 m²
= 9.60 m²

Page 158 of 368


RINCIAN VOLUME (M) VOLUME

7 8 9 10

1.00 m'

1.20 m'
2.20 m'
15.40 m'

= 0.20 m²
= 0.20 m²

1.00 m'

2.20 m'
3.20 m'
3.20 m'

= 0.40 m²
= 0.40 m²

4.30 m'

0.90 m'
5.20 m'
62.40 m'

x 12.00 = 36.00 Buah

x 12.00 = 20.16 m²

Page 159 of 368


RINCIAN VOLUME (M) VOLUME

7 8 9 10

Page 160 of 368


RINCIAN VOLUME (M) VOLUME

7 8 9 10

= 607.50 m²
= 397.24 m²
300.16 m²

JUMLAH TOTAL VOLUME PEK. CAT DINDING LUAR (EXTERIOR) LANTAI 1 = 607.50 m²
JUMLAH TOTAL VOLUME PEK. CAT DINDING LUAR (EXTERIOR) LANTAI 2 = 397.24 m²
JUMLAH TOTAL VOLUME PEK. CAT DINDING LUAR (EXTERIOR) LANTAI 3 = 300.16 m²



JUMLAH TOTAL VOLUME PEK. CAT DINDING LUAR (INTERIOR) LANTAI 1 = 432.52 m²
JUMLAH TOTAL VOLUME PEK. CAT DINDING LUAR (INTERIOR) LANTAI 2 = 375.99 m²
JUMLAH TOTAL VOLUME PEK. CAT DINDING LUAR (INTERIOR) LANTAI 3 = 290.46 m²

JUMLAH TOTAL VOLUME PEK. CAT PELITUR KAYU LANTAI 1 = 19.95 m²


JUMLAH TOTAL VOLUME PEK. CAT PELITUR KAYU LANTAI 2 = 104.17 m²

JUMLAH TOTAL VOLUME PEK. CAT PLAFOND LANTAI 1 = 184.06 m²


JUMLAH TOTAL VOLUME PEK. CAT PLAFOND LANTAI 2 = 115.41 m²
JUMLAH TOTAL VOLUME PEK. CAT PLAFOND LANTAI 3 = 140.37 m²

Page 161 of 368


RINCIAN VOLUME (M) VOLUME

7 8 9 10

JUMLAH TOTAL VOLUME PEK. CAT LISTPLANG = 18.33 m²

m'
m'

JUMLAH TOTAL VOLUME PEK. PAS BUBUNGAN = 39.65 m'

= 42.95 m²
= 71.75 m²

JUMLAH TOTAL VOLUME PEK. PAS GENTENG = 229.41 m²

JUMLAH TOTAL VOLUME PEK. ATAP TEMPRET GLASS = 22.56 m²

61.10 m'

= 0.00 m³
= 0.00 m³
= 0.00 m³
= 8.21 m³

JUMLAH TOTAL VOLUME PEK. LANTAI KERJA = 8.21 m²

Page 162 of 368


RINCIAN VOLUME (M) VOLUME

7 8 9 10

0.45 m³
110.88 kg
3.81 m²

2.70 m³
171.69 kg
7.20 m²

12.80 m³
579.94 kg
25.60 m²

7.20 m³
215.58 kg
19.20 m²

6.96 m³
1,306.19 kg
69.60 m²

1.25 m³
569.46 kg
33.06 m²

6.93 m³
1,366.64 kg
72.45 m²

4.15 m³
824.35 kg
56.66 m²

Page 163 of 368


RINCIAN VOLUME (M) VOLUME

7 8 9 10

8.38 m³
1,543.22 kg
84.00 m²

1.52 m³
463.15 kg
39.90 m²

2.37 m³
725.97 kg
62.10 m²

1.47 m³
196.66 kg
14.11 m²

1.06 m³
196.95 kg
14.11 m²

4.75 m³
657.45 kg
25.33 m²

Page 164 of 368


RINCIAN VOLUME (M) VOLUME

7 8 9 10

2.64 m³
1,137.43 kg
26.45 m²

9.56 m³
1,737.05 kg
96.00 m²

1.91 m³
576.38 kg
50.40 m²

4.29 m³
689.11 kg
43.94 m²

11.81 m³
1,902.49 kg
123.25 m²

2.40 m³
490.96 kg
32.55 m²

5.11 m³
660.12 kg
25.33 m²

26.80 m³
9,604.70 kg
223.33 m²

Page 165 of 368


RINCIAN VOLUME (M) VOLUME

7 8 9 10

8.37 m³
1,556.37 kg
84.00 m²

1.12 m³
332.00 kg
29.40 m²

4.29 m³
689.11 kg
43.94 m²

7.36 m³
1,189.80 kg
76.88 m²

2.40 m³
490.96 kg
32.55 m²

Page 166 of 368


RINCIAN VOLUME (M) VOLUME

7 8 9 10

1.38 m³
253.93 kg
18.30 m²

0.15 m³
31.94 kg
2.83 m²

17.09 m³
6,125.28 kg
142.43 m²

1.29 m³
556.47 kg
12.94 m²

2.42 m³
613.19 kg
34.72 m²

0.86 m³
191.19 kg
15.67 m²

361.31 kg
673.62 kg
20.42 kg

170.56 kg
424.73 kg
6.81 kg

Page 167 of 368


RINCIAN VOLUME (M) VOLUME

7 8 9 10

326.37 kg
575.45 kg
18.25 kg

3,605.69 kg

124.90 kg

7.00 Titik
1.00 Titik
1.00 Titik

11.00 Titik
19.00 Titik
8.00 Titik

11.00 Titik
19.00 Titik
8.00 Titik

Page 168 of 368


RINCIAN VOLUME (M) VOLUME

7 8 9 10

2.00 Titik
- Titik
- Titik

11.00 Buah
9.00 Buah
7.00 Buah

1.00 Buah
1.00 Buah
- Buah

3.00 Buah
5.00 Buah
3.00 Buah

3.00 Buah
3.00 Buah
2.00 Buah

9.00 Buah
9.00 Buah
6.00 Buah

6.00 Buah
4.00 Buah
3.00 Buah

Page 169 of 368


RINCIAN VOLUME (M) VOLUME

7 8 9 10

1.00 Buah
1.00 Buah
1.00 Buah

155.00 Buah
155.00 Buah
130.00 Buah

3.00 Buah
3.00 Buah
2.00 Buah

- Buah
1.00 Buah
- Buah

Page 170 of 368


RINCIAN VOLUME (M) VOLUME

7 8 9 10

6.00 Buah
3.00 Buah
2.00 Buah

3.00 Buah
3.00 Buah
2.00 Buah

3.00 Buah
2.00 Buah
2.00 Buah

1.00 Buah
1.00 Buah
- Buah

2.00 Unit

1.00 Unit

57.76 m'
33.00 m'
26.35 m'

35.00 m'
23.60 m'
18.45 m'

Page 171 of 368


RINCIAN VOLUME (M) VOLUME

7 8 9 10

41.30 m'
51.10 m'
38.30 m'

Page 172 of 368


A.1. REKAP VOLUME PEKERJAAN

PEKERJAAN : PEMBANGUNAN RUMAH 3 LANTAI


LOKASI : JL. WOLTER MONGINSIDI, NO. 23, SEMARANG

NO. URAIAN PEKERJAAN VOLUME

I. PEKERJAAN PERSIAPAN

1 Pembersihan lahan + tebang pohon 629.000


2 Uitzet dan Bowplank 112.000
3 Pembuatan Pagar seng pengaman proyek finish cat 116.000
4 Air kerja 1.000
5 Listrik kerja 1.000
6 Pembuatan gudang material /alat 9.000
7 Papan nama proyek 1.000
8 Administrasi dan Dokumentasi 1.000

II. PEKERJAAN TANAH

1 Galian tanah pondasi batu belah 285.208


2 Galian tanah pondasi footplat 98.339
3 Urugan peninggian tanah 417.405
4 Urugan pasir bawah lantai 42.488
5 Urugan pasir bawah pondasi 36.104
6 Urugan tanah kembali 217.157

III. PEKERJAAN STRUKTUR

A SUB STRUKTUR

1 Lantai kerja 8.21


2 Footplat tangga
- Beton K-250 0.45
- Besi 110.88
- Bekisting 3.81
3 Footplat type P1
- Beton K-250 2.70
- Besi 171.69
- Bekisting 7.20
4 Footplat type P2
- Beton K-250 12.80

Page 173 of 368


NO. URAIAN PEKERJAAN VOLUME

- Besi 579.94
- Bekisting 25.60
5 Footplat type P3
- Beton K-250 7.20
- Besi 215.58
- Bekisting 19.20

Page 174 of 368


NO. URAIAN PEKERJAAN VOLUME

6 Kolom pedestal (40x40)


- Beton K-250 6.96
- Besi 1,306.19
- Bekisting 69.60
7 Kolom pedestal (15x15)
- Beton K-255 1.25
- Besi 569.46
- Bekisting 33.06
8 Sloof BS1 (25x40)
- Beton K-250 6.93
- Besi 1,366.64
- Bekisting 72.45
9 Sloof BSP (15x25)
- Beton K-250 4.15
- Besi 824.35
- Bekisting 56.66

B PEKERJAAN STRUKTUR ATAS

- LANTAI 1
1 Kolom (40x40)
- Beton K-250 8.38
- Besi 1,543.22
- Bekisting 84.00
2 Kolom (15x15)
- Beton K-255 1.52
- Besi 463.15
- Bekisting 39.90
3 Kolom pagar (15x15)
- Beton K-255 2.37
- Besi 725.97
- Bekisting 62.10
4 Ringbalk pagar (15x15)
- Beton K-255 1.47
- Besi 196.66
- Bekisting 14.11
5 Ringbalk dinding kolam (15x15)
- Beton K-255 1.06
- Besi 196.95
- Bekisting 14.11
6 Tangga utama
- Beton K-250 4.75

Page 175 of 368


NO. URAIAN PEKERJAAN VOLUME

- Besi 657.45
- Bekisting 25.33
7 Plat lantai gazebo
- Beton K-250 2.64
- Besi 1,137.43
- Bekisting 26.45

Page 176 of 368


NO. URAIAN PEKERJAAN VOLUME

- LANTAI 2
1 Kolom (40x40)
- Beton K-250 9.56
- Besi 1,737.05
- Bekisting 96.00
2 Kolom (15x15)
- Beton K-250 1.91
- Besi 576.38
- Bekisting 50.40
3 Balok (25x55)
- Beton K-250 4.29
- Besi 689.11
- Bekisting 43.94
4 Balok (25x50)
- Beton K-250 11.81
- Besi 1,902.49
- Bekisting 123.25
5 Balok (20x40)
- Beton K-250 2.40
- Besi 490.96
- Bekisting 32.55
6 Tangga utama
- Beton K-250 5.11
- Besi 660.12
- Bekisting 25.33
7 Plat lantai 2
- Beton K-250 26.80
- Besi 9,604.70
- Bekisting 223.33

- LANTAI 3
1 Kolom (40x40)
- Beton K-250 8.37
- Besi 1,556.37
- Bekisting 84.00
2 Kolom (15x15)
- Beton K-250 1.12
- Besi 332.00
- Bekisting 29.40
3 Balok (25x55)
- Beton K-250 4.29

Page 177 of 368


NO. URAIAN PEKERJAAN VOLUME

- Besi 689.11
- Bekisting 43.94

Page 178 of 368


NO. URAIAN PEKERJAAN VOLUME

4 Balok (25x50)
- Beton K-250 7.36
- Besi 1,189.80
- Bekisting 76.88
5 Balok (20x40)
- Beton K-250 2.40
- Besi 490.96
- Bekisting 32.55
6 Balok RB (20x40)
- Beton K-250 1.38
- Besi 253.93
- Bekisting 18.30
7 Balok RB (15x30)
- Beton K-250 0.15
- Besi 31.94
- Bekisting 2.83
8 Plat lantai 3
- Beton K-250 17.09
- Besi 6,125.28
- Bekisting 142.43
9 Plat dak atap
- Beton K-250 1.29
- Besi 556.47
- Bekisting 12.94

- RING BALK
1 Balok RB (20x40)
- Beton K-250 2.42
- Besi 613.19
- Bekisting 34.72
2 Balok RB (15x30)
- Beton K-250 0.86
- Besi 191.19
- Bekisting 15.67

- ATAP
1 Kuda-kuda type K
- 2L.60.60.6 361.31
- 2L.50.50.5 673.62
- Jarum Gording Ø10 mm 20.42
2 Kuda-kuda type K'
- 2L.60.60.6 170.56

Page 179 of 368


NO. URAIAN PEKERJAAN VOLUME

- 2L.50.50.5 424.73
- Jarum Gording Ø10 mm 6.81
3 Kuda-kuda type J
- 2L.60.60.6 326.37
- 2L.50.50.5 575.45
- Jarum Gording Ø10 mm 18.25

Page 180 of 368


NO. URAIAN PEKERJAAN VOLUME

4 Gording (2C.125.50.20.2,3) 3,605.69


5 Nok (2C.125.50.20.2,3) 124.90

IV PEKERJAAN ARSITEKTUR

- LANTAI 1

A PEKERJAAN PASANGAN

1 Pasangan batu belah 1 : 5 79.51


2 Pasangan aanstamping 34.57
3 Pasangan rollag batu kali 1 : 5 12.14
4 Pasangan dinding batu bata 1 : 5 764.94
5 Pasangan dinding batu bata 1 : 3 27.00
6 Pasangan keramik dinding kamar mandi (20X40) 21.15
7 Pasangan Keramik mozaik kolam ikan 129.93
8 Pasangan batu alam 54.51

B PEKERJAAN PLESTERAN DAN ACIAN

1 Plesteran dinding batu bata 1 : 5 (1 : 4) 1,529.87


2 Plesteran dinding batu bata 1 : 3 (1 : 3) 54.00
3 Acian dinding batu bata 1 : 5 1,345.44
4 Acian dinding batu bata 1 : 3 32.85

C PEKERJAAN LANTAI

1 Pasangan keramik (40x40) 214.00


2 Pasangan keramik (30x30) 41.87
3 Pasangan Keramik kamar mandi (20x20) 5.47
4 Pasangan lantai parket kayu 17.22
5 Pasangan paving block 104.58

D PEKERJAAN PINTU DAN JENDELA

1 Pintu jendela type PJ1


- Kusen alumunium 18.05
- Daun pintu 3.15
- Daun jendela 4.13
- Kaca bening t = 5 mm 6.42
- Engsel Jendela 7.00

Page 181 of 368


NO. URAIAN PEKERJAAN VOLUME

- Kunci Jendela geser 3.00


- Engsel pintu 6.00
- Kunci pintu tanam 1.00

Page 182 of 368


NO. URAIAN PEKERJAAN VOLUME

2 Pintu jendela type PJ2


- Kusen alumunium 20.20
- Daun pintu 1.62
- Daun jendela 2.60
- Kaca bening t = 5 mm 6.67
- Engsel Jendela 4.00
- Kunci Jendela geser 2.00
- Engsel Pintu 3.00
- Kunci pintu tanam 1.00

3 Pintu type P1
- Kusen alumunium 15.60
- Daun pintu 5.04
- Engsel Pintu 9.00
- Kunci pintu tanam 3.00

4 Pintu type P2 3.00

5 Jendela type J1
- Kusen alumunium 12.10
- Daun jendela 4.37
- Kaca bening t = 5 mm 3.67
- Engsel Jendela 4.00
- Kunci Jendela geser 2.00

6 Jendela type J2
- Kusen alumunium 9.10
- Daun jendela 1.38
- Kaca bening t = 5 mm 2.53
- Engsel Jendela 2.00
- Kunci Jendela geser 1.00

7 Jendela type J3
- Kusen alumunium 15.80
- Daun jendela 6.75
- Kaca bening t = 5 mm 5.81
- Engsel Jendela 6.00
- Kunci Jendela geser 3.00

8 Jendela type J4
- Kusen alumunium 6.20
- Daun jendela 1.90

Page 183 of 368


NO. URAIAN PEKERJAAN VOLUME

- Kaca bening t = 5 mm 1.62


- Engsel Jendela 2.00
- Kunci Jendela geser 1.00

Page 184 of 368


NO. URAIAN PEKERJAAN VOLUME

9 Jendela type BV
- Kusen alumunium 6.60
- Kaca buram t = 5 mm 0.60

E PEKERJAAAN PELAFOND

1 Plafond gypsum board t = 9 mm + metal frame 184.06


2 List tepi plafond profil gypsum 148.10

F PEKERJAAN RAILLING DAN ACP

1 Railling tangga & void 11.28


2 Railling gazebo 8.10
3 Railling balkon 9.20
4 Pasangan ACP + rangka 100.85

G PEKERJAAN CAT

1 Pengecatan dinding luar (exterior) 607.50


2 Pengecatan dinding dalam (interior) 432.52
3 Pengecatan plafond 184.06
4 Pengecatan plitur kayu atap gazebo 19.95

- LANTAI 2

A PEKERJAAN PASANGAN

1 Pasangan dinding batu bata 1 : 5 375.99


2 Pasangan dinding batu bata 1 : 3 34.50
3 Pasangan keramik dinding kamar mandi (20X40) 28.65
4 Pasangan batu alam 7.40

B PEKERJAAN PLESTERAN DAN ACIAN

1 Plesteran dinding batu bata 1 : 5 (1 : 4) 751.99


2 Plesteran dinding batu bata 1 : 3 (1 : 3) 69.00
3 Acian dinding batu bata 1 : 5 744.59
4 Acian dinding batu bata 1 : 3 40.35

Page 185 of 368


NO. URAIAN PEKERJAAN VOLUME

C PEKERJAAN LANTAI

1 Pasangan keramik (40x40) 117.60


2 Pasangan keramik kamar mandi (20x20) 10.17
3 Pasangan lantai parket kayu roof garden 42.05

D PEKERJAAN PINTU DAN JENDELA

1 Pintu jendela type PJ3


- Kusen alumunium 27.70
- Daun pintu 1.68
- Daun jendela 11.76
- Kaca bening t = 5 mm 11.38
- Engsel Jendela 14.00
- Kunci Jendela geser 9.00
- Engsel pintu 3.00
- Kunci pintu tanam 1.00

2 Pintu jendela type PJ4


- Kusen alumunium 24.30
- Daun pintu 1.68
- Daun jendela 4.10
- Kaca bening t = 5 mm 8.09
- Engsel Jendela 6.00
- Kunci Jendela geser 4.00
- Engsel pintu 3.00
- Kunci pintu tanam 1.00

3 Pintu type P1
- Kusen alumunium 26.00
- Daun pintu 8.40
- Engsel pintu 15.00
- Kunci pintu tanam 5.00

4 Pintu type P2 3.00

5 Jendela type J5
- Kusen alumunium 20.60
- Daun jendela 7.60
- Kaca bening t = 5 mm 6.48
- Engsel jendela 4.00

Page 186 of 368


NO. URAIAN PEKERJAAN VOLUME

- Kunci jendela geser 2.00

Page 187 of 368


NO. URAIAN PEKERJAAN VOLUME

6 Jendela type BV
- Kusen alumunium 4.40
- Kaca buram t = 5 mm 0.40

7 Jendela type BV1


- Kusen alumunium 3.20
- Kaca buram t = 5 mm 0.40

E PEKERJAAAN PELAFOND

1 Plafond gypsum board t = 9 mm + metal frame 115.41


2 List tepi plafond profil gypsum 131.40

F PEKERJAAN RAILLING DAN ACP

1 Railling tangga & void 11.28


2 Railling balkon 9.60
3 Pasangan ACP + rangka 110.30

G PEKERJAAN CAT

1 Pengecatan dinding luar (exterior) 397.24


2 Pengecatan dinding dalam (interior) 375.99
3 Pengecatan plafond 115.41
4 Pengecatan pelitur kayu pagar roof garden 104.17

- LANTAI 3

A PEKERJAAN PASANGAN

1 Pasangan dinding batu bata 1 : 5 286.56


2 Pasangan dinding batu bata 1 : 3 21.00
3 Pasangan keramik dinding kamar mandi (20X40) 17.10
5 Pasangan batu alam 7.40

B PEKERJAAN PLESTERAN DAN ACIAN

1 Plesteran dinding batu bata 1 : 5 (1 : 4) 573.12


2 Plesteran dinding batu bata 1 : 3 (1 : 3) 42.00
3 Acian dinding batu bata 1 : 5 549.46
4 Acian dinding batu bata 1 : 3 24.90

Page 188 of 368


NO. URAIAN PEKERJAAN VOLUME

C PEKERJAAN LANTAI

1 Pasangan keramik (40x40) 116.51


2 Pasangan keramik kamar mandi (20x20) 5.82

D PEKERJAAN PINTU DAN JENDELA

1 Pintu jendela type PJ4


- Kusen alumunium 24.30
- Daun pintu 1.68
- Daun jendela 4.10
- Kaca bening t = 5 mm 8.09
- Engsel Jendela 6.00
- Kunci Jendela geser 4.00
- Engsel pintu 3.00
- Kunci pintu tanam 1.00

2 Pintu type P1
- Kusen alumunium 20.80
- Daun pintu 6.72
- Engsel pintu 12.00
- Kunci pintu tanam 4.00

3 Pintu type P2 2.00

4 Jendela type J5
- Kusen alumunium 51.50
- Daun jendela 19.00
- Kaca bening t = 5 mm 16.20
- Engsel jendela 20.00
- Kunci jendela geser 10.00

5 Jendela type J6
- Kusen alumunium 30.40
- Kaca bening t = 5 mm 9.21

6 Jendela type J7
- Kusen alumunium 39.40
- Kaca bening t = 5 mm 9.60

7 Jendela type BV
- Kusen alumunium 4.40

Page 189 of 368


NO. URAIAN PEKERJAAN VOLUME

- Kaca buram t = 5 mm 0.40

Page 190 of 368


NO. URAIAN PEKERJAAN VOLUME

E PEKERJAAAN PELAFOND

1 Plafond gypsum board t = 9 mm + metal frame 140.37


2 List tepi plafond profil gypsum 121.35

F PEKERJAAN RAILLING DAN ACP

1 Railling balkon 3.85

G PEKERJAAN CAT

1 Pengecatan dinding luar (exterior) 300.16


2 Pengecatan dinding dalam (interior) 375.99
3 Pengecatan plafond 140.37
4 Pengecatan listplang 18.33

- ATAP

1 Pasangan genteng 229.41


2 Pasangan bubungan 39.65
3 Pasangan tempered glass atap gazebo 22.56
4 Pasangan listplang 61.10

V PEKERJAAN MEP

- LANTAI 1

A PEKERJAAN MEKANIKAL ELEKTRIKAL

1 Down Light E27 Ess 8 Watt 11.00


2 Down Light E27 Ess 18 Watt 11.00
3 TL Balk 1 x 36 Watt 7.00
4 Baret E27 Ess 18 Watt 2.00
5 Ceiling Exhaust Fan 3.00
6 Saklar Ganda 6.00
7 Saklar Tunggal 9.00
8 Saklar Tukar/Hotel 1.00
9 Stop kontak 16A.200W.1PH 11.00
10 Stop kontak 16A.200W.2PH 1.00
11 MCB 1.00
12 Kabel NYM 2 x 2.5 155.00

Page 191 of 368


NO. URAIAN PEKERJAAN VOLUME

13 Indoor Unit Ac, Wall Mounted Type 3.00

Page 192 of 368


NO. URAIAN PEKERJAAN VOLUME

B PEKERJAAN SANITASI

1 Floor drain 3.00


2 Closet duduk 3.00
3 Wastafel 1.00
4 Kran air 6.00
5 Bak air UVC 3.00
6 Tandon air kapasitas 300 liter 1.00
7 Kitchen sink 1.00
8 Pipa air Ø 1/2'' 57.76
9 Pipa air Ø 3'' 35.00
10 Pipa air Ø 4" 41.30
11 Cermin 0.96
12 Sumur resapan 2.00
13 Septictannk Biofilter 1.00

- LANTAI 2

A PEKERJAAN MEKANIKAL ELEKTRIKAL

1 Down Light E27 Ess 8 Watt 19.00


2 Down Light E27 Ess 18 Watt 19.00
3 TL Balk 1 x 36 Watt 1.00
4 Ceiling Exhaust Fan 3.00
5 Saklar Ganda 4.00
6 Saklar Tunggal 9.00
7 Saklar Tukar/Hotel 1.00
8 Stop kontak 16A.200W.1PH 9.00
9 Stop kontak 16A.200W.2PH 1.00
10 MCB 1.00
11 Kabel NYM 2 x 2.5 155.00
12 Indoor Unit Ac, Wall Mounted Type 5.00

B PEKERJAAN SANITASI

1 Floor drain 3.00


2 Closet duduk 3.00
3 Wastafel 1.00
4 Kran air 3.00
5 Bathtub 1.00
6 Bak air UVC 2.00
7 Pipa air Ø 1/2'' 33.00

Page 193 of 368


NO. URAIAN PEKERJAAN VOLUME

8 Pipa air Ø 3'' 23.60


9 Pipa air Ø 4" 51.10
10 Cermin 0.96

Page 194 of 368


NO. URAIAN PEKERJAAN VOLUME

- LANTAI 3

A PEKERJAAN MEKANIKAL ELEKTRIKAL

1 Down Light E27 Ess 8 Watt 8.00


2 Down Light E27 Ess 18 Watt 8.00
3 TL Balk 1 x 36 Watt 1.00
4 Ceiling Exhaust Fan 2.00
5 Saklar Ganda 3.00
6 Saklar Tunggal 6.00
7 Saklar Tukar/Hotel 1.00
8 Stop kontak 16A.200W.1PH 7.00
9 Stop kontak 16A.200W.2PH -
10 MCB 1.00
11 Kabel NYM 2 x 2.5 130.00
12 Indoor Unit Ac, Wall Mounted Type 3.00

B PEKERJAAN SANITASI

1 Floor drain 2.00


2 Closet duduk 2.00
3 Wastafel -
4 Kran air 2.00
5 Bathtub -
6 Bak air UVC 2.00
7 Pipa air Ø 1/2'' 26.35
8 Pipa air Ø 3'' 18.45
9 Pipa air Ø 4" 38.30
10 Cermin 0.64

Page 195 of 368


SAT


m'
m'
ls
ls


unit







Kg


Kg

Page 196 of 368


SAT

Kg


Kg

Page 197 of 368


SAT


Kg


Kg


Kg


Kg


Kg


Kg


Kg


Kg


Kg

Page 198 of 368


SAT

Kg


Kg

Page 199 of 368


SAT


Kg


Kg


Kg


Kg


Kg


Kg


Kg


Kg


Kg

Page 200 of 368


SAT

Kg

Page 201 of 368


SAT


Kg


Kg


Kg


Kg


Kg


Kg


Kg


Kg

Kg
Kg
Kg

Kg

Page 202 of 368


SAT

Kg
Kg

Kg
Kg
Kg

Page 203 of 368


SAT

Kg
Kg
















m'



buah

Page 204 of 368


SAT

buah
buah
buah

Page 205 of 368


SAT

m'



buah
buah
buah
buah

m'

buah
buah

unit

m'


buah
buah

m'


buah
buah

m'


buah
buah

m'

Page 206 of 368


SAT


buah
buah

Page 207 of 368


SAT

m'


m'

m'
m'
m'










Page 208 of 368


SAT



m'



buah
buah
buah
buah

m'



buah
buah
buah
buah

m'

buah
buah

unit

m'


buah

Page 209 of 368


SAT

buah

Page 210 of 368


SAT

m'

m'


m'

m'
m'










Page 211 of 368


SAT


m'



buah
buah
buah
buah

m'

buah
buah

unit

m'


buah
buah

m'

m'

m'

Page 212 of 368


SAT

Page 213 of 368


SAT


m'

m'







m'

titik
titik
titik
titik
buah
buah
buah
buah
buah
buah
unit
m'

Page 214 of 368


SAT

unit

Page 215 of 368


SAT

buah
buah
buah
buah
buah
buah
buah
m'
m'
m'

buah
buah

titik
titik
titik
buah
buah
buah
buah
buah
buah
unit
m'
unit

buah
buah
buah
buah
buah
buah
m'

Page 216 of 368


SAT

m'
m'

Page 217 of 368


SAT

titik
titik
titik
buah
buah
buah
buah
buah
buah
unit
m'
unit

buah
buah
buah
buah
buah
buah
m'
m'
m'

Page 218 of 368


B. HARGA SATUAN DASAR (BAHAN, UPAH DAN ALAT)
B.1. HARGA UPAH PEKERJA

DAFTAR UPAH PEKERJA

SUMBER DATA : PASARAN BEBAS


D A E R A H : KOTA SEMARANG & SEKITAR

HARGA
NO. URAIAN PEKERJA SATUAN MINIMUM MAKSIMUM
(Rp) (Rp)
1 Pekerja Hr 75,000 85,000
2 Mandor Hr 100,000 110,000
3 Tukang listrik Hr 95,000 105,000
4 Tukang kayu Hr 95,000 105,000
5 Kep. tk. kayu Hr 110,000 120,000
6 Tukang batu Hr 95,000 105,000
7 Kep. tk. batu Hr 110,000 120,000
8 Tukang besi Hr 95,000 105,000
9 Kep. tk. besi Hr 110,000 120,000
10 T u k a n g c a t Hr 95,000 105,000
11 K e p . t k . c a t Hr 110,000 120,000
12 T u k a n g p l i t u r Hr 95,000 105,000
13 T u k a n g j a l a n Hr 75,000 85,000
14 T u k a n g g a l i Hr 75,000 85,000
15 Tukang masak aspal Hr 75,000 85,000
16 T k . l e i d e n g Hr 95,000 105,000
17 M a s i n i s Hr 150,000 175,000
18 P e m b . M a s i n i s Hr 100,000 125,000
19 P e n j a g a a p i Hr 75,000 85,000
20 P e n j a g a m a l a m Hr 75,000 85,000
21 Sopir Hr 140,000 150,000
22 Pembantu Sopir Hr 85,000 100,000

Page 219 of 368


DAFTAR UPAH PEKERJA

EDISI III 2018


HARGA
YANG DIPAKAI KET.
(Rp)
80,000
105,000
100,000
100,000
115,000
100,000
115,000
100,000
115,000
100,000
115,000
100,000
80,000
80,000
80,000
100,000
162,500
112,500
80,000
80,000
145,000
92,500

Page 220 of 368


B.2. HARGA SATUAN BAHAN BANGUNAN

DAFTAR HARGA SATUAN BAHAN BANGUNAN

SUMBER DATA : PASARAN BEBAS


D A E R A H : KOTA SEMARANG & SEKITAR

HARGA
NO. J E N I S B A H A N SAT MINIMUM
(Rp)

I BAHAN DASAR
1 BATU KALI
Bulat Belah m3 260,000.00
2 KERIKIL
Beton 1/2 m3 300,000.00
3 BATU BATA
ex lokal bh 600.00
4 PASIR Urug m3 160,000.00
Pasang m3 310,000.00
Beton m3 350,000.00
5 TANAH Padas m3 120,000.00

6 PORTLAND CEMENT
Merk I 50 kg zak 52,500.00
Merk II 50 kg zak 52,000.00
Semen Putih 50 kg zak 90,000.00
Semen warna kg 11,000.00
Semen khusus (MU-408) kg
Semen khusus (MU-440) kg
Semen khusus (MU-450) kg
Semen khusus (MU-460) kg

II BAHAN PENUTUP ATAP

Page 221 of 368


HARGA
NO. J E N I S B A H A N SAT MINIMUM
(Rp)
1 GENTENG TANAH LIAT
Plentong super besar 18 bh/m2 bh 5,100.00
Nok kerpus plentong super bh 9,000.00
2 SENG GELOMBANG
BJLS 0,30 panjang 180 cm lbr 59,000.00
BJLS 0,40 panjang 180 cm lbr 69,000.00
III . B A H A N K A Y U
1 KAMPER Papan m3 7,200,000.00
Balok/pesagen m3 6,100,000.00
2 KRUING Papan m3 6,250,000.00
Balok/pesagen m3 5,051,000.00
3 MERANTI Papan m3 4,800,000.00
Balok/pesagen m3 4,500,000.00
4 DOLKEN Sedang 8 x 10 x 400 cm bt 21,000.00
Kecil 6 x 7 x 400 cm bt 18,000.00

Page 222 of 368


HARGA
NO. J E N I S B A H A N SAT MINIMUM
(Rp)
IV . BAHAN PENUTUP DINDING / LANTAI
1 MOZAIK PORSELIN
15 X 15 cm m2 45,000.00

2 Keramik 30 X 30 cm m2 37,000.00
20 X 20 cm m2 46,500.00
3 Ubin Keramik Dinding 30 x 25 cm m2 50,000.00
4 Parquet Jati m2 210,000.00
5 Batu Paros m2 110,000.00
6 GRANITO 40 x 40 cm m2 220,000.00
7 Marmer m2 475,000.00

V.BAHAN BESI
1 BESI BETON besi beton polos kg 9,500.00
besi beton prestress kg 13,000.00
besi beton ulir kg 12,500.00

2 BESI PLAT Besi Strip kg 13,000.00

3 BESI PROFIL Besi Profil kg 13,500.00


4 BAJA RINGAN
type CT 75 lebar : 7,5cm tebal : 0.75mm btg 105,000.00
5 HOLLOW GALVANIS LIPAT
tinggi 5 cm; tebal : 2 mm btg 230,000.00

6 KAWAT - Ikat beton/bendrat kg 18,000.00

7 Hollow stainlessel 40x40x1.2 mm m' 97,000.00


8 Plat stainless steel penjepit kaca bh 123,400.00

Page 223 of 368


HARGA
NO. J E N I S B A H A N SAT MINIMUM
(Rp)
9 Plat stainless steel 30x3 mm m' 25,000.00
10 Kaki stainless dia 2,5" produk pabrik m' 24,000.00
11 Stainless dia 1" m' 85,000.00
12 Handrail stainless dia 2" tebal 1,3 m' 110,000.00

VI . B A H A N P I P A
1 Pipa PVC SII SCJ , S - 12,5 (10 bar)
Pipa PVC DN 40 ( 1½" ) btg 56,000.00
Pipa PVC DN 90 ( 3" ) btg 125,000.00
Pipa PVC DN 110 ( 4" ) btg 180,000.00

Page 224 of 368


HARGA
NO. J E N I S B A H A N SAT MINIMUM
(Rp)
VII . B A H A N L A N G I T - L A N G I T
1 List gypsum profil m'
2 Gypsum tebal 9 mm lbr 60,000.00
3 PLY WOOD
Teak wood
. 90 X 210 X 4 mm lbr 65,000.00
. 90 X 210 X 9 mm lbr 95,000.00

Teakwood 4' x 8' x 4 mm lbr 85,000.00

VIII . B A H A N F I N I S H I N G
1 KAYU
Dempul plamur kg 16,000.00
Ambril/amplas lbr 3,000.00
Cat dasar kg 35,000.00
- Koas bh 7,500.00
. Plitur jadi ltr 61,000.00
2 TEMBOK
Plamur kg 16,000.00
Cat Tembok kg 23,000.00
3 BESI
Menie kg 20,000.00
Cat mengkilat kg 55,000.00

IX . B A H A N K A C A
1 Kaca Cermin m² 225,000.00
2 Kaca Buram m² 230,000.00
3 Kaca Clear m² 220,000.00
4 kaca acrylic t=8 mm m² 620,000.00

Page 225 of 368


HARGA
NO. J E N I S B A H A N SAT MINIMUM
(Rp)
X . BAHAN INSTALASI LISTRIK
1 KABEL LISTRIK
NYA : .
PRIMA 1 X 1 1/2 mm2 m' 4,200.00
NYM :.
PRIMA 2 X 2 1/2 mm2 m' 10,900.00

2 SKAKELAR

Saklar Ganda Seri buah 41,000.00


Saklar Tunggal Seri buah 21,500.00
Saklar Tukar/Hotel buah 28,000.00

5 STOP KONTAK
Stop kontak 16A.200W.1PH buah 25,000.00
Stop kontak 16A.200W.2PH buah 40,000.00

Page 226 of 368


HARGA
NO. J E N I S B A H A N SAT MINIMUM
(Rp)
6 LAMPU

Ceiling Exhaust Fan mv 16 ex bh 140,000.00

Lampu TL Balk 1 x 36 Watt bh 100,000.00

Lampu Down Light E27 Ess 18 Watt bh 70,000.00

Lampu Down Light E27 Ess 8 Watt bh 47,000.00

Lampu Baret E27 Ess 18 Watt bh 165,000.00

7 LAIN-LAIN
Indoor Unit Ac, Wall Mounted Type 1 PK buah 3,550,000.00

T.Dus buah 500.00

L.Bow buah 500.00

Klem buah 50.00

MCB buah 125,000.00

Pipa Listrik 5/8" **) kg 4,000.00

XI . ALAT - ALAT PENGUNCI & PENGGANTUNG


1 KUNCI TANAM Union : 2 X slag bh 165,000.00

2 Kunci Geser bh 64,000.00

3 ENGSEL DAN GERENDEL


Engsel Angin bh 15,000.00
Nylon kupu-kupu bh 6,000.00
Kait Angin bh 15,000.00

XII . BAHAN SANITAIR


1 KLOSET DUDUK bh 1,300,000.00
2 WASTAFEL MEJA OVAL bh 700,000.00

Page 227 of 368


HARGA
NO. J E N I S B A H A N SAT MINIMUM
(Rp)
3 WASTAFEL BAK CUCI bh 145,000.00
4 Batchuip bh 2,400,000.00
5 Water Drain & assesories bh 35,000.00
6 Bak Fibreglass bh 276,000.00
7 Tandon Air 300 liter bh 635,000.00
8 Sumur resapan bh 1,325,000.00
9 Septictannk Biofilter bh 2,400,000.00

4 LAIN - LAIN
Kran Air bh 25,000.00
Seal tape bh 2,000.00
Floor drain bh 25,000.00

Page 228 of 368


HARGA
NO. J E N I S B A H A N SAT MINIMUM
(Rp)
XIII . ALAT PENGIKAT KAYU
1 PAKU - ukuran 1" s/d 4" kg 15,000.00
2 PAKU - sekrup kg 6,000.00
4 LEM KAYU bh 12,500.00

Skrup fixer bh 5,000.00

X IV . PAVING BLOCK
1 SQUARE Merah/hitam m2 85,000.00

XV. L A I N - L A I N
1 Kusen Almunium 4" Putih m' 80,000.00
2 Allumunium Strip m' 4,500.00

LAIN-LAIN
Minyak Beton & bekisting ltr 9,000.00
2 Aluminium Composite Panel ACP 4 mm m2 750,000.00
Kaca Tempered t=8 mm m2 225,000.00
Aluminum L 2,5 cm t=1.2 mm m' 29,000.00
Air m3 15,000.00
sealant tube 55,000.00
Solar (Industri) ltr 7,000.00
Pintu UPVC unit 345,000.00
Pelumas ltr 37,500.00

Page 229 of 368


AN BANGUNAN

NG & SEKITAR
EDISI III 2018

HARGA
MAKSIMUM YANG DIPAKAI KET
(Rp) (Rp)

335,000.00 297,500.00

400,000.00 350,000.00

650.00 625.00
230,000.00 195,000.00
370,000.00 340,000.00
380,000.00 365,000.00
150,000.00 135,000.00

53,500.00 53,000.00
54,000.00 53,000.00
95,000.00 92,500.00
15,000.00 13,000.00
14,000.00
1,962.50
4,625.00
19,200.00

Page 230 of 368


HARGA
MAKSIMUM YANG DIPAKAI KET
(Rp) (Rp)

5,350.00 5,225.00
9,200.00 9,100.00

60,000.00 59,500.00
72,000.00 70,500.00

7,800,000.00 7,500,000.00
7,500,000.00 6,800,000.00
8,800,000.00 7,525,000.00
6,000,000.00 5,525,500.00
5,700,000.00 5,250,000.00
5,400,000.00 4,950,000.00
24,000.00 22,500.00
21,000.00 19,500.00

Page 231 of 368


HARGA
MAKSIMUM YANG DIPAKAI KET
(Rp) (Rp)

55,000.00 50,000.00

56,000.00 46,500.00
56,000.00 51,250.00
60,000.00 55,000.00
310,000.00 260,000.00
115,000.00 112,500.00
250,000.00 235,000.00
480,000.00 477,500.00

10,500.00 10,000.00
14,500.00 13,750.00
13,000.00 12,750.00

14,000.00 13,500.00

14,500.00 14,000.00

115,000.00 110,000.00 panj : 6 m


-
250,000.00 240,000.00 panj : 6 m

20,000.00 19,000.00

115,500.00 106,250.00
130,000.00 126,700.00

Page 232 of 368


HARGA
MAKSIMUM YANG DIPAKAI KET
(Rp) (Rp)
30,000.00 27,500.00
28,000.00 26,000.00
90,000.00 87,500.00
115,000.00 112,500.00

68,000.00 62,000.00 panj : 4 m


185,000.00 155,000.00 panj : 4 m
280,000.00 230,000.00 panj : 4 m

Page 233 of 368


HARGA
MAKSIMUM YANG DIPAKAI KET
(Rp) (Rp)

6,500.00
68,000.00 64,000.00

80,000.00 72,500.00
125,000.00 110,000.00
90,000.00 87,500.00

30,000.00 23,000.00
4,100.00 3,550.00
40,000.00 37,500.00
8,000.00 7,750.00
65,000.00 63,000.00

32,000.00 24,000.00
26,000.00 24,500.00

36,000.00 28,000.00
58,000.00 56,500.00

275,000.00 250,000.00
255,000.00 242,500.00
230,000.00 225,000.00
650,000.00 635,000.00

Page 234 of 368


HARGA
MAKSIMUM YANG DIPAKAI KET
(Rp) (Rp)

5,000.00 4,600.00

11,500.00 11,200.00

43,000.00 42,000.00
25,000.00 23,250.00
31,000.00 29,500.00

31,000.00 28,000.00
60,000.00 50,000.00

Page 235 of 368


HARGA
MAKSIMUM YANG DIPAKAI KET
(Rp) (Rp)

165,000.00 152,500.00
159,000.00 129,500.00
73,000.00 71,500.00
48,000.00 47,500.00
195,000.00 180,000.00

3,775,000.00 3,662,500.00
600.00 550.00
600.00 550.00
60.00 55.00
135,000.00 130,000.00
4,200.00 4,100.00

175,000.00 170,000.00

85,000.00 74,500.00

25,000.00 20,000.00
9,000.00 7,500.00
17,500.00 16,250.00

1,850,000.00 1,575,000.00
950,000.00 825,000.00

Page 236 of 368


HARGA
MAKSIMUM YANG DIPAKAI KET
(Rp) (Rp)
165,000.00 155,000.00
2,500,000.00 2,450,000.00
42,000.00 38,500.00
290,000.00 283,000.00
740,000.00 687,500.00
1,500,000.00 1,412,500.00
2,500,000.00 2,450,000.00

45,000.00 35,000.00
4,000.00 3,000.00
35,000.00 30,000.00

Page 237 of 368


HARGA
MAKSIMUM YANG DIPAKAI KET
(Rp) (Rp)

17,500.00 16,250.00
8,000.00 7,000.00
20,000.00 16,250.00
5,500.00 5,250.00

90,000.00 87,500.00

85,000.00 82,500.00
5,000.00 4,750.00

10,000.00 9,500.00
800,000.00 775,000.00
230,000.00 227,500.00
32,000.00 30,500.00
20,000.00 17,500.00
65,000.00 60,000.00
7,200.00 7,100.00
365,000.00 355,000.00
45,000.00 41,250.00

Page 238 of 368


C. ANALISA HARGA SATUAN

PEKERJAAN : PEMBANGUNAN RUMAH 3 LANTAI


LOKASI : JL. WOLTER MONGINSIDI, NO. 23, SEMARANG

No Uraian & Indeks Koefisien

I. PEKERJAAN PERSIAPAN

1 1 m² Pembersihan Lapangan
Upah
0.1000 OH Pekerja
0.0500 OH Mandor

2 1 m' Pengukuran dan Pasang Papan Bowplank


Bahan
0.0120 m3 Kayu kls III
0.0200 kg Paku biasa 2" - 5 "
0.0070 m3 Kayu Papan kls III 3/20

Upah
0.1000 OH Tukang Kayu
0.1000 OH Pekerja
0.0100 OH Kepala Tukang Kayu
0.0050 OH Mandor

3 1 m² Pembuatan gudang semen dan alat-alat


Bahan
1.7000 Btg Dolken kayu Ø 8-10 / 400 cm
0.1050 m3 Kayu meranti 5/7
0.3000 kg Paku biasa 2" - 5 "
10.5000 kg Semen Portland
0.0300 m3 Pasir beton
0.0500 m3 Koral beton
1.5000 Lbr Seng gelombang bljs 32

Upah
2.0000 OH Tukang Kayu
1.0000 OH Pekerja
0.2000 OH Kepala Tukang
0.0500 OH Mandor

Page 239 of 368


No Uraian & Indeks Koefisien

4 1 m' Pagar sementara dari seng gelombang tinggi 2 m


Bahan
1.2500 Btg Dolken kayu Ø 8-10 / 400 cm
2.5000 kg Semen Portland
1.2000 Lbr Seng gelombang 3" - 5"
0.0050 m3 Pasir beton
0.0090 m3 Koral beton
0.0360 m3 Kayu meranti 5/7
0.0600 kg Paku biasa 2" - 5 "
0.4500 kg Meni besi

Upah
0.2000 OH Tukang Kayu
0.4000 OH Pekerja
0.0200 OH Kepala Tukang
0.0200 OH Mandor

Page 240 of 368


No Uraian & Indeks Koefisien

5 1 unit Papan Nama Proyek


Bahan
1.2500 Btg Kaso 4/6
0.0500 kg Paku biasa 2" - 5 "
1.0000 Lbr Plywood 4mm
0.8000 kg Cat minyak

Upah
0.3200 OH Pekerja
1.0000 OH Mandor

II. PEKERJAAN TANAH

1 1 m³ Menggali Tanah Biasa Sedalam 1 m


Upah
0.75 OH Pekerja
0.025 OH Mandor

2 1 m³ Menggali Tanah Biasa Sedalam 2 m


Upah
0.900 OH Pekerja
0.045 OH Mandor

3 1 m³ Mengurug TANAH Padat untuk Peninggian Lantai Bangunan


Bahan
1.2 m3 tanah padas

Upah
0.25 OH Pekerja
0.025 OH Mandor

4 1 m³ Urugan pasir
Bahan
1.2 m3 Pasir Urug

Upah
0.3 OH Pekerja
0.01 OH Mandor

5 1 m³ Urugan tanah kembali

Page 241 of 368


No Uraian & Indeks Koefisien

Upah
0.5 OH Pekerja
0.05 OH Mandor

III. PEKERJAAN STRUKTUR

1 1 m³ Membuat Lantai Kerja Beton mutu f'c=7,4 MPa (K100), slum (3-6)cm, w/c = 0,87
Bahan
230.00 Kg Portland Semen
893.00 Kg Pasir beton
1,027.00 Kg Kerikil (maksimum 30 mm)
200.00 Ltr Air

Upah
1.200 OH Pekerja
0.200 OH Tukang Batu
0.020 OH Kepala Tukang
0.006 OH Mandor

Page 242 of 368


No Uraian & Indeks Koefisien

2 1 m³ Membuat beton mutu fc = 19.3 Mpa (K225). slum (12+2) cm. w/c = 0.58
Bahan
371.00 Kg Portland Semen
698.00 Kg Pasir beton
1,047.00 Kg Kerikil (maksimum 30 mm)
215.00 Ltr Air

Upah
1.650 OH Pekerja
0.275 OH Tukang Batu
0.028 OH Kepala Tukang
0.083 OH Mandor

3 1 m³ Membuat beton mutu fc = 21.7 Mpa (K250). slum (12+2) cm. w/c = 0.56
Bahan
384.00 Kg Portland Semen
692.00 Kg Pasir beton
1,039.00 Kg Kerikil (maksimum 30 mm)
215.00 Ltr Air

Upah
1.650 OH Pekerja
0.275 OH Tukang Batu
0.028 OH Kepala Tukang
0.083 OH Mandor

4 10 Kg Pembesian dg Besi Polos atau Besi Ulir


Bahan
10.500 Kg Besi Beton (polos/ulir)
0.150 Kg Kawat Beton

Upah
0.070 OH Pekerja
0.070 OH Tukang Besi
0.007 OH Kepala Tukang
0.004 OH Mandor

5 1 m² Memasang Bekisting Untuk Pondasi 2x pakai


Bahan

0.020 m3 Kayu Klas III (Terentang)


0.300 Kg Paku Biasa 2" - 5"

Page 243 of 368


No Uraian & Indeks Koefisien

0.100 Ltr Minyak Bekisting

Upah
0.520 OH Pekerja
0.260 OH Tukang Kayu
0.026 OH Kepala Tukang
0.026 OH Mandor

6 1 m² Memasang Bekisting untuk Sloof 2x pakai


Bahan
0.023 m3 Kayu Klas III (Terentang)
0.300 Kg Paku Biasa 2" - 5"
0.100 Ltr Minyak Bekisting

Upah
0.520 OH Pekerja
0.260 OH Tukang Kayu
0.026 OH Kepala Tukang
0.026 OH Mandor

Page 244 of 368


No Uraian & Indeks Koefisien

7 1 m² Memasang Bekisting untuk Kolom 2x pakai


Bahan
0.020 m3 Kayu Klas III (Terentang)
0.400 Kg Paku Biasa 2" - 5"
0.200 Ltr Minyak Bekisting
0.008 m3 Balok Kayu Klas II
0.175 Lbr Plywood tebal 9mm
1.000 Btg Dolken Kayu Galam diameter 8 - 10 cm / 4m

Upah
0.660 OH Pekerja
0.330 OH Tukang Kayu
0.033 OH Kepala Tukang
0.033 OH Mandor

8 1 m² Memasang Bekisting untuk Balok 2x pakai


Bahan
0.020 m3 Kayu Klas III (Terentang)
0.400 Kg Paku Biasa 2" - 5"
0.200 Ltr Minyak Bekisting
0.009 m3 Balok Kayu Klas II
0.175 Lbr Plywood tebal 9mm
1.000 Btg Dolken Kayu Galam diameter 8 - 10 cm / 4m

Upah
0.660 OH Pekerja
0.330 OH Tukang Kayu
0.033 OH Kepala Tukang
0.033 OH Mandor

9 1 m² Memasang Bekisting untuk Lantai 2x pakai


Bahan
0.020 m3 Kayu Klas III (Terentang)
0.400 Kg Paku Biasa 2" - 5"
0.200 Ltr Minyak Bekisting
0.008 m3 Balok Kayu Klas II (borneo)
0.175 Lbr Plywood tebal 9mm
3.000 Btg Dolken Kayu Galam diameter 8 - 10 cm / 4m

Upah
0.660 OH Pekerja
0.330 OH Tukang Kayu
0.033 OH Kepala Tukang

Page 245 of 368


No Uraian & Indeks Koefisien

0.033 OH Mandor

10 1 m² Memasang Bekisting untuk Tangga 2x pakai


Bahan
0.015 m3 Kayu Klas III (Terentang)
0.400 Kg Paku Biasa 2" - 5"
0.150 Ltr Minyak Bekisting
0.008 m3 Balok Kayu Klas II (borneo)
0.175 Lbr Plywood tebal 9mm
1.000 Btg Dolken Kayu Galam diameter 8 - 10 cm / 4m

Upah
0.660 OH Pekerja
0.330 OH Tukang Kayu
0.033 OH Kepala Tukang
0.033 OH Mandor

Page 246 of 368


No Uraian & Indeks Koefisien

11 1 Kg Memasang Besi Profil


Bahan
1.15 Kg Besi Profil
0.06 Kg Meni Besi

Upah
0.06 OH Pekerja
0.06 OH Tukang Besi
0.006 OH Kepala Tukang
0.003 OH Mandor

12 1 Kg Mengerjakan Pekerjaan Perakitan (kuda-kuda Baja)


Bahan
1 Ltr Solar
0.1 Ltr Minyak Pelumas

Upah
0.1 OH Pekerja
0.1 OH Tukang Besi
0.001 OH Kepala Tukang
0.005 OH Mandor

IV. PEKERJAAN ARSITEKTUR

1 1 m³ Memasanq Pondasi Batu Kali 1Pc : 5 Psr


Bahan
1.2 m3 Batu Belah 15/20
136 Kg Portland Sement
0.544 m3 Pasir Pasang

Upah
1.5 OH Pekerja
0.75 OH Tukang Batu
0.075 OH KepalaTukang
0.075 OH Mandor

2 1 m³ Pasangan batu kosong


Bahan
1.200 m3 Batu belah
0.432 m3 Pasir Urug

Upah

Page 247 of 368


No Uraian & Indeks Koefisien

0.780 OH Pekerja
0.390 OH Tukang Batu
0.039 OH Kepala Tukang Batu
0.039 OH Mandor

3 1 m² Memasang Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1/2 Bata Camp. 1Pc : 5PP
Bahan
70 Buah Bata Merah 5 x 11 x 22
9.68 Kg Portland Semen
0.045 m3 Pasir Pasang

Upah
0.3 OH Pekerja
0.1 OH Tukang Batu
0.01 OH Kepala Tukang
0.015 OH Mandor

Page 248 of 368


No Uraian & Indeks Koefisien

4 1 m² Memasang Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1/2 Bata Camp. 1Pe : 3PP
Bahan
70 Buah Bata Merah 5 x 11 x 22
14.37 Kg Portland Semen
0.04 m3 Pasir Pasang

Upah
0.3 OH Pekerja
0.1 OH Tukang Batu
0.01 OH Kepala Tukang
0.015 OH Mandor

5 1 m² Memasang Plesteran 1 Pc : 3 Pp Tebal 15 mm


Bahan
7.776 Kg Portland Semen
0.023 m3 Pasir Pasang

Upah
0.3 OH Pekerja
0.15 OH Tukang batu
0.015 OH Kepala Tukang
0.015 OH Mandor

6 1 m² Memasang Plesteran 1 PC : 4 Pp Tebal 15 mm


Bahan
6.24 Kg Portland Semen
0.024 m3 Pasir Pasang

Upah
0.3 OH Pekerja
0.15 OH Tukang batu
0.015 OH Kepala Tukang
0.015 OH Mandor

7 1 m² Memasang Acian
Bahan
3.25 Kg Portland Semen

Upah
0.2 OH Pekerja
0.1 OH Tukang batu
0.01 OH Kepala Tukang

Page 249 of 368


No Uraian & Indeks Koefisien

0.01 OH Mandor

8 1 m² Memasang lantai Ubin Granito Uk. 40 x 40 cm


Bahan
1.050 m2 Ubin Granito 40 x 40 cm
9.800 Kg Portland Semen
0.045 m3 Pasir Pasang
1.300 Kg Semen warna

Upah
0.250 OH Pekerja
0.125 OH Tukang Batu
0.013 OH Kepala Tukang
0.013 OH Mandor

Page 250 of 368


No Uraian & Indeks Koefisien

9 1 m² Memasang Lantai Keramik 30 x 30 cm


Bahan
1.050 m2 Ubin Keramik 30 x 30 cm
10.000 Kg Portland Semen
0.045 m3 Pasir Pasang
1.500 Kg Semen warna

Upah
0.700 OH Pekerja
0.350 OH Tukang Batu
0.035 OH Kepala Tukang
0.035 OH Mandor

10 1 m² Memasang Lantai Keramik 20 x 20 cm (area basah) dengn semen khusus


Bahan
1.050 m2 Ubin Keramik 20 x 20 cm
5.000 Kg Semen Khusus perekat keramik area basah (MU-460) t=3 mm
0.351 Kg Semen warna pengisi nat keramik (MU-408)

Upah
0.467 OH Pekerja
0.233 OH Tukang Batu
0.023 OH Kepala Tukang
0.023 OH Mandor

11 1 m² Memasang Lantai Parquet Jati


Bahan
1.050 m2 Parquet Jati
0.600 Kg Lem Vynil

Upah
0.700 OH Pekerja
0.350 OH Tukang Batu
0.035 OH Kepala Tukang
0.035 OH Mandor

12 1 m² Memasang Lantai Mozaik


Bahan
1.050 m2 Ceramic Mozaik
26.667 Kg Semen khusus Floor Screed (MU-440) t=15 mm
5.000 Kg Semen Khusus perekat keramik (MU-450) t=3 mm
0.351 Kg Semen warna pengisi nat keramik (MU-408)

Page 251 of 368


No Uraian & Indeks Koefisien

Upah
0.250 OH Pekerja
0.125 OH Tukang Batu
0.013 OH Kepala Tukang
0.013 OH Mandor

13 1 m² Memasang Dind Keramik 20 x 40 cm (area basah) dengn semen khusus


Bahan
1.050 m2 Ubin Keramik Dinding 30 x 25 cm
5.000 Kg Semen Khusus perekat keramik area basah (MU-460)
0.970 Kg Semen warna pengisi nat keramik (MU-408)

Upah
0.900 OH Pekerja
0.450 OH Tukang Batu
0.045 OH Kepala Tukang
0.045 OH Mandor

Page 252 of 368


No Uraian & Indeks Koefisien

14 1 m² Memasang Dinding Batu Paros / Batu Tempel Hitam


Bahan
1.100 m2 Batu Paros
11.750 Kg Portland Semen
0.035 m3 Pasir Pasang

Upah
1.300 OH Pekerja
0.650 OH Tukang Batu
0.065 OH Kepala Tukang
0.065 OH Mandor

15 1 m² Memasang Dinding Marmer Ukuran 1.00 x 1.00 cm


Bahan
1.060 bh Marmer
3.000 bh Paku 12 cm
12.440 Kg Portland Semen
0.025 m3 Pasir Pasang
0.650 Kg Semen warna

Upah
1.300 OH Pekerja
0.650 OH Tukang Batu
0.065 OH Kepala Tukang
0.065 OH Mandor

16 1 m³ Memasang konstruksi Gording. Kayu Klas II


Bahan
1.100 m3 Kayu Klas I (Kamfer). balok
15.000 Kg Besi Strip
3.000 Kg Paku Biasa 2" - 5"

Upah
2.400 OH Pekerja
7.200 OH Tukang Kayu
0.720 OH Kepala Tukang
0.120 OH Mandor

17 1 m² Memasang Langit-langit Gypsum Board, Uk (120 x 240) tebal 9 mm


Bahan
0.364 Lbr Gypsum Board
0.150 kg Kawat

Page 253 of 368


No Uraian & Indeks Koefisien

0.560 kg compon
3.600 m' Metalfuring
0.220 Kg Paku Sekrup

Upah
0.300 OH Pekerja
0.300 OH Tukang Kayu
0.015 OH Kepala Tukang
0.015 OH Mandor

Page 254 of 368


No Uraian & Indeks Koefisien

18 1 m' List Langit-langit Profil gypsum


Bahan
1.050 m' List Profil
0.050 Kg alkasit

Upah
0.030 OH Pekerja
0.030 OH Tukang kayu
0.003 OH Kepala Tukang
0.003 OH Mandor

19 1 m' Memasang Listplank Uk. (3x30)cm Kayu klas I atau II


Bahan
0.011 m3 Kayu klas II (Kamfer). papan
0.050 Kg Paku Biasa 2" - 5"

Upah
0.100 OH Pekerja
0.200 OH Tukang Kayu
0.020 OH Kepala Tukang
0.005 OH Mandor

20 1 m² Memasang Paving Blok


Bahan
1.01 m² Paving blok T=8 cm K400
0.06 m³ Pasir pasang

Upah
0.20 OH Pekerja
0.15 OH Tukang batu
0.015 OH Kepala Tukang batu
0.008 OH Mandor

21 1 m² Memasang Aluminium Composite Panel ( ACP) Ornamen


Bahan
1.10 m² ACP 4 mm
3.20 m' rangka hollow 50x50x1,6
1.00 m' rangka aluminum L 2,5 cm t=1.2 mm
0.15 tube sealant
1.00 ls Sekrup

Upah

Page 255 of 368


No Uraian & Indeks Koefisien

1.00 OH Pekerja
0.50 OH Tukang besi
0.04 OH Kepala Tukang
0.15 OH Mandor

22 1 m' Memasang Railling pipa Tangga & void


Bahan
1.20 m' hollow stainlessel 40x40x1.2 mm
4.00 bh plat stainless steel penjepit kaca
1.00 m' plat stainless steel 30x3 mm
1.02 m² kaca acrylic t=8 mm
1.00 ls Alat bantu
1.00 ls Pengelasan + grinda

Upah
0.50 OH Pekerja
0.01 OH Mandor

Page 256 of 368


No Uraian & Indeks Koefisien

23 1 m' Memasang Railling pipa


Bahan
1.05 m' kaki stainless dia 2,5" produk pabrik
4.20 m' stainless dia 1"
1.05 m' handrail stainless dia 2" tebal 1,3
1.00 ls Pengelasan argon + grinda dan asesories
1.00 ls Alat bantu

Upah
0.50 OH Pekerja
0.01 OH Mandor

24 1 m² Memasang Kaca Tempered t=8 mm


Bahan
1.00 m2 Kaca Tempered t=8 mm
1.00 tube sealant

Upah
0.48 OH Pekerja
0.64 OH Tukang Kayu
0.048 OH Kepala Tukang
0.016 OH Mandor

25 1 m' Memasang Kusen Allumunium Natural


Bahan
1.100 m' Profil Allumunium
2.000 Buah Skrup Fixer
0.060 Tube Sealant

Upah
0.043 OH Pekerja
0.043 OH Tukang Besi
0.0043 OH Kepala Tukang
0.0021 OH Mandor

26 1 m² Pemasangan Pintu Allumunium Strip Lebar 8 cm


Bahan
4.40 m' Profil Allumunium
14.60 m' Allumunium Strip

Upah
0.085 OH Pekerja

Page 257 of 368


No Uraian & Indeks Koefisien

0.085 OH Tukang Besi


0.0085 OH Kepala Tukang
0.0042 OH Mandor

27 1 m² Pemasangan Jendela Allumunium Strip Lebar 8 cm


Bahan
4.40 m' Profil Allumunium
14.60 m' Allumunium Strip

Upah
0.085 OH Pekerja
0.085 OH Tukang Besi
0.0085 OH Kepala Tukang
0.0042 OH Mandor

Page 258 of 368


No Uraian & Indeks Koefisien

28 1 m² Pasang Pintu Taekwood Rangkap, rangka alumunium


Bahan
14.600 m' Kusen alumunium uk 4'' sekualitas Indal
0.030 kg Paku Biasa 1/2" - 1"
0.300 ltr Lem kayu (putih) Fox
1.000 lbr Teakwood 4' x 8' x 4 mm

Upah
0.600 OH Pekerja
2.000 OH Tukang Kayu
0.200 OH Kepala tukang
0.030 OH Mandor

29 1 m² Memasang Kaca Clear t = 5 mm


Bahan
1.1 m2 Kaca clear t=5 mm

Upah
0.15 OH Pekerja
0.15 OH Tukang Kayu
0.015 OH Kepala Tukang
0.008 OH Mandor

30 1 m² Memasang Kaca Buram t = 5 mm


Bahan
1.1 m2 Kaca buram t=5 mm

Upah
0.15 OH Pekerja
0.15 OH Tukang Kayu
0.015 OH Kepala Tukang
0.008 OH Mandor

31 1 m² Memasang Kaca Cermin t = 5 mm


Bahan
1.1 m² Kaca Cermin

Upah
0.015 OH Pekerja
0.15 OH Tukang Kayu
0.015 OH Kepala Tukang
0.00075 OH Mandor

Page 259 of 368


No Uraian & Indeks Koefisien

32 1 Buah Engsel Pintu


Bahan
1.000 Buah Engsel pintu nylon

Upah
0.015 OH Pekerja
0.150 OH Tukang Kayu
0.015 OH Kepala Tukang
0.008 OH Mandor

Page 260 of 368


No Uraian & Indeks Koefisien

33 1 Buah Pemasangan Engsel Jendela Kupu-kupu


Bahan
1.000 Buah Engsel Jendela (angin)
1.000 Buah Kait Angin
Upah
0.010 OH Pekerja
0.100 OH Tukang Kayu
0.010 OH Kepala Tukang
0.005 OH Mandor

34 1 Buah Pemasangan Kunci Tanam Biasa


Bahan
1.000 Buah Kunci Tanam Biasa

Upah
0.010 OH Pekerja
0.500 OH Tukang Kayu
0.010 OH Kepala Tukang
0.005 OH Mandor

35 1 Buah Pemasangan Kunci Geser


Bahan
1.000 Buah Kunci Geser

Upah
0.005 OH Pekerja
0.500 OH Tukang Kayu
0.005 OH Kepala Tukang
0.003 OH Mandor

36 1 m² Pengecat Tembok Baru (1lap.Plamir, 1 lap Cat Dasar,2 lap, cat penutup ) eksterior
Bahan
0.1 Kg Plamir
0.1 Kg Cat Dasar
0.28 Kg Cat Penutup 2 kali

Upah
0.02 OH Pekerja
0.063 OH Tukang Cat
0.0063 OH Kepala Tukang
0.0025 OH Mandor

Page 261 of 368


No Uraian & Indeks Koefisien

37 1 m² Pengecat Tembok Baru (1lap.Plamir, 1 lap Cat Dasar, 2 lap, cat penutup ) Interior
Bahan
0.1 Kg Plamir
0.1 Kg Cat Dasar
0.28 Kg Cat Penutup 2 kali

Upah
0.02 OH Pekerja
0.063 OH Tukang Cat
0.0063 OH Kepala Tukang
0.0025 OH Mandor

Page 262 of 368


No Uraian & Indeks Koefisien

38 1 m² Pengecatan Bidang Kayu dengan Plitur jadi


Bahan
1 Ltr Plitur jadi
0.05 Ltr Dempul
0.1 Lbr Ampelas
0.01 Buah Kuas

Upah
0.2 OH Pekerja
0.3 OH Tukang Cat
0.02 OH Kepala Tukang
0.0025 OH Mandor

39 1 m² Pengecat Plafond Baru (1 lap Cat Dasar, 2 lap cat penutup) interior
Bahan
0.1 Kg Cat Dasar
0.28 Kg Cat Penutup 2 kali
0.02 Bh Kuwas/roll
0.25 Lbr Amplas

Upah
0.02 OH Pekerja
0.063 OH Tukang Cat
0.0063 OH Kepala Tukang
0.0025 OH Mandor

40 1 m² Pasang Genteng plentong glazur


Bahan
18.000 bh Genteng plentong glazur

Upah
0.150 OH Pekerja
0.075 OH Tukang Kayu
0.008 OH Kepala Tukang
0.008 OH Mandor

41 1 m' Pasang Atap Nok Genteng plentong glazur


Bahan
5.000 pcs genteng bubung glazur
8.000 kg porland semen
0.032 m3 pasir pasang

Page 263 of 368


No Uraian & Indeks Koefisien

Upah
0.400 OH Pekerja
0.200 OH Tukang Kayu
0.020 OH Kepala Tukang
0.002 OH Mandor

V. PEKERJAAN MEKANIKAL ELEKTRIKAL & PELAMBING

1 1 Buah Memasang Bak Cuci Piring Stailes Steel


Bahan
1.000 bh Bak Cuci Stainles Steel + kran leher
1.000 Set Water Drain & assesories

Upah
0.03 OH Pekerja
0.3 OH Tukang Ledeng
0.03 OH Kepala Tukang
0.0015 OH Mandor

Page 264 of 368


No Uraian & Indeks Koefisien

2 1 Unit Memasang Closet Duduk / Mono Blok


Bahan
1.00 Bh Kloset Duduk CW 421J/SW420 JP-TCW07S
0.06 Kelengkapan 6% dari harga Kloset

Upah
3.3 OH Pekerja
1.1 OH Tukang Batu
0.001 OH Kepala Tukang
0.16 OH Mandor

3 1 Unit Memasang Wastafel


Bahan
1.000 Bh Wastafel Meja LW 247 CJ
0.300 - Perlengkapan 30% Harga Wastafel
6.000 Kg Portland Semen
0.010 m3 Pasir Pasang

Upah
1.200 OH Pekerja
0.145 OH Tukang Batu
0.150 OH Kepala Tukang
0.100 OH Mandor

4 1 Buah Memasang Floor Drain


Bahan
1.000 Buah Floor Drain TX 1 BN

Upah
0.010 OH Pekerja
0.100 OH Tukang Batu
0.010 OH Kepala Tukang
0.005 OH Mandor

5 1 Buah Memasang Kran Air Ø ½" atau Ø ¾"


Bahan
1.000 Buah Kran T 23 B 13
0.025 tube Seal tape

Upah
0.010 OH Pekerja
0.400 OH Tukang Batu

Page 265 of 368


No Uraian & Indeks Koefisien

0.010 OH Kepala Tukang


0.005 OH Mandor

6 1 Unit Pemasangan Bathcuip porselen


Bahan
1.000 Buah Batchuip
0.200 - Perlengkapan 20% Harga Bathcuip

Upah
0.075 OH Pekerja
0.75 OH Tukang Batu
0.075 OH Kepala Tukang
0.003 OH Mandor

Page 266 of 368


No Uraian & Indeks Koefisien

7 1 Unit Pemasangan Bak Fibreglass vol.1 m3


Bahan
1.000 Buah Bak Fibreglass
0.120 - Perlengkapan 12% Bak Fibreglass

Upah
0.075 OH Pekerja
0.75 OH Tukang Batu
0.075 OH Kepala Tukang
0.003 OH Mandor

8 1 m' Pemasangan Pipa PVC tipe AW Ø ½"


Bahan
1.200 m' Pipa PVC Ø ½"
0.350 Ls Perlengkapan 35% x pipa

Upah
0.036 OH Pekerja
0.060 OH Tukang Batu
0.006 OH Kepala Tukang
0.002 OH Mandor

9 1 m' Pemasangan Pipa PVC tipe AW Ø 3"


Bahan
1.200 m' Pipa PVC Ø 3"
0.350 Ls Perlengkapan 35% x pipa

Upah
0.081 OH Pekerja
0.135 OH Tukang Batu
0.0135 OH Kepala Tukang
0.004 OH Mandor

10 1 m' Pemasangan Pipa PVC tipe AW Ø 4"


Bahan
1.200 m' Pipa PVC Ø 4"
0.350 Ls Perlengkapan 35% x pipa

Upah
0.036 OH Pekerja
0.06 OH Tukang Batu
0.006 OH Kepala Tukang

Page 267 of 368


No Uraian & Indeks Koefisien

0.002 OH Mandor

11 1 Titik Pemasangan Lampu Down Light E27 Ess 8 Watt


Bahan
1.000 Buah Lampu Down Light E27 Ess 8 Watt

Upah
2.1 OH Tukang Listrik
0.035 OH Mandor

Page 268 of 368


No Uraian & Indeks Koefisien

12 1 Titik Pemasangan Lampu Down Light E27 Ess 18 Watt


Bahan
1.000 Buah Lampu Down Light E27 Ess 18 Watt

Upah
2.1 OH Tukang Listrik
0.035 OH Mandor

13 1 Titik Pemasangan Lampu TL Balk 1 x 36 Watt


Bahan
1.000 Buah Lampu TL Balk 1 x 36 Watt

Upah
2.1 OH Tukang Listrik
0.035 OH Mandor

14 1 Titik Pemasangan Baret E27 Ess 18 Watt


Bahan
1.000 Buah Lampu Baret E27 Ess 18 Watt

Upah
2.1 OH Tukang Listrik
0.035 OH Mandor

15 1 Buah Pemasangan Ceiling Exhaust Fan


Bahan
1.000 Buah Ceiling Exhaust Fan

Upah
2.1 OH Tukang Listrik
0.035 OH Mandor

16 1 Buah Pemasangan Saklar Ganda


Bahan
1.000 Buah Saklar Ganda

Upah
2.1 OH Tukang Listrik
0.035 OH Mandor

Page 269 of 368


No Uraian & Indeks Koefisien

17 1 Buah Pemasangan Saklar Tunggal


Bahan
1.000 Buah Saklar Tunggal

Upah
2.1 OH Tukang Listrik
0.035 OH Mandor

18 1 Buah Pemasangan Saklar Tukar/Hotel


Bahan
1.000 Buah Saklar Tukar/Hotel

Upah
2.1 OH Tukang Listrik
0.035 OH Mandor

Page 270 of 368


No Uraian & Indeks Koefisien

19 1 Buah Pemasangan Stop kontak 16A.200W.1PH


Bahan
1.000 Buah Stop kontak 16A.200W.1PH

Upah
2.1 OH Tukang Listrik
0.035 OH Mandor

20 1 Buah Pemasangan Stop kontak 16A.200W.2PH


Bahan
1.000 Buah Stop kontak 16A.200W.2PH

Upah
2.1 OH Tukang Listrik
0.035 OH Mandor

21 1 Buah Pemasangan MCB


Bahan
3.00 Kg Pipa Listrik 5/8" **)
15.00 m Kabel **)
1.00 buah T.Dus
2.00 buah L.Bow
24.00 buah Klem
1.00 buah MCB

Upah
2.1 OH Tukang Listrik
0.035 OH Mandor

22 1 m' Pemasangan Kabel NYM 2 x 2.5


Bahan
1.100 m' Kabel NYM 2 x 2.5

Upah
0.678 OH Tukang Listrik
0.035 OH Mandor

23 1 Unit Pemasangan Indoor Unit Ac, Wall Mounted Type


Bahan
1.000 m' Indoor Unit Ac, Wall Mounted Type 1 PK

Page 271 of 368


No Uraian & Indeks Koefisien

Upah
2.1 OH Tukang Listrik
0.035 OH Mandor

Page 272 of 368


Harga Satuan Jumlah Harga

Rp 13,250.00

Rp 80,000.00 Rp 8,000.00
Rp 105,000.00 Rp 5,250.00

Rp 138,981.00

Rp 5,525,500.00 Rp 66,306.00
Rp 16,250.00 Rp 325.00
Rp 7,525,000.00 Rp 52,675.00

Rp 100,000.00 Rp 10,000.00
Rp 80,000.00 Rp 8,000.00
Rp 115,000.00 Rp 1,150.00
Rp 105,000.00 Rp 525.00

Rp 999,955.00

Rp 22,500.00 Rp 38,250.00
Rp 4,950,000.00 Rp 519,750.00
Rp 16,250.00 Rp 4,875.00
Rp 1,060.00 Rp 11,130.00
Rp 365,000.00 Rp 10,950.00
Rp 350,000.00 Rp 17,500.00
Rp 59,500.00 Rp 89,250.00

Rp 100,000.00 Rp 200,000.00
Rp 80,000.00 Rp 80,000.00
Rp 115,000.00 Rp 23,000.00
Rp 105,000.00 Rp 5,250.00

Page 273 of 368


Harga Satuan Jumlah Harga

Rp 355,325.00

Rp 22,500.00 Rp 28,125.00
Rp 1,060.00 Rp 2,650.00
Rp 59,500.00 Rp 71,400.00
Rp 365,000.00 Rp 1,825.00
Rp 350,000.00 Rp 3,150.00
Rp 4,950,000.00 Rp 178,200.00
Rp 16,250.00 Rp 975.00
Rp 28,000.00 Rp 12,600.00

Rp 100,000.00 Rp 20,000.00
Rp 80,000.00 Rp 32,000.00
Rp 115,000.00 Rp 2,300.00
Rp 105,000.00 Rp 2,100.00

Page 274 of 368


Harga Satuan Jumlah Harga

Rp 273,487.50

Rp 19,500.00 Rp 24,375.00
Rp 16,250.00 Rp 812.50
Rp 72,500.00 Rp 72,500.00
Rp 56,500.00 Rp 45,200.00

Rp 80,000.00 Rp 25,600.00
Rp 105,000.00 Rp 105,000.00

Rp 62,625.00

Rp 80,000.00 Rp 60,000.00
Rp 105,000.00 Rp 2,625.00

Rp 76,725.00

Rp 80,000.00 Rp 72,000.00
Rp 105,000.00 Rp 4,725.00

Rp 184,625.00

Rp 135,000.00 Rp 162,000.00

Rp 80,000.00 Rp 20,000.00
Rp 105,000.00 Rp 2,625.00

Rp 259,050.00

Rp 195,000.00 Rp 234,000.00

Rp 80,000.00 Rp 24,000.00
Rp 105,000.00 Rp 1,050.00

Rp 45,250.00

Page 275 of 368


Harga Satuan Jumlah Harga

Rp 80,000.00 Rp 40,000.00
Rp 105,000.00 Rp 5,250.00

Rp 875,547.86

Rp 1,060.00 Rp 243,800.00
Rp 260.71 Rp 232,817.86
Rp 269.23 Rp 276,500.00
Rp 17.50 Rp 3,500.00

Rp 80,000.00 Rp 96,000.00
Rp 100,000.00 Rp 20,000.00
Rp 115,000.00 Rp 2,300.00
Rp 105,000.00 Rp 630.00

Page 276 of 368


Harga Satuan Jumlah Harga

Rp 1,032,320.69

Rp 1,060.00 Rp 393,260.00
Rp 260.71 Rp 181,978.57
Rp 269.23 Rp 281,884.62
Rp 17.50 Rp 3,762.50

Rp 80,000.00 Rp 132,000.00
Rp 100,000.00 Rp 27,500.00
Rp 115,000.00 Rp 3,220.00
Rp 105,000.00 Rp 8,715.00

Rp 1,042,382.55

Rp 1,060.00 Rp 407,040.00
Rp 260.71 Rp 180,414.29
Rp 269.23 Rp 279,730.77
Rp 17.50 Rp 3,762.50

Rp 80,000.00 Rp 132,000.00
Rp 100,000.00 Rp 27,500.00
Rp 115,000.00 Rp 3,220.00
Rp 105,000.00 Rp 8,715.00

Rp 150,550.00

Rp 12,750.00 Rp 133,875.00
Rp 19,000.00 Rp 2,850.00

Rp 80,000.00 Rp 5,600.00
Rp 100,000.00 Rp 7,000.00
Rp 115,000.00 Rp 805.00
Rp 105,000.00 Rp 420.00

Rp 184,145.00

Rp 5,250,000.00 Rp 105,000.00
Rp 16,250.00 Rp 4,875.00

Page 277 of 368


Harga Satuan Jumlah Harga

Rp 9,500.00 Rp 950.00

Rp 80,000.00 Rp 41,600.00
Rp 100,000.00 Rp 26,000.00
Rp 115,000.00 Rp 2,990.00
Rp 105,000.00 Rp 2,730.00

Rp 197,270.00

Rp 5,250,000.00 Rp 118,125.00
Rp 16,250.00 Rp 4,875.00
Rp 9,500.00 Rp 950.00

Rp 80,000.00 Rp 41,600.00
Rp 100,000.00 Rp 26,000.00
Rp 115,000.00 Rp 2,990.00
Rp 105,000.00 Rp 2,730.00

Page 278 of 368


Harga Satuan Jumlah Harga

Rp 289,651.25

Rp 5,250,000.00 Rp 105,000.00
Rp 16,250.00 Rp 6,500.00
Rp 9,500.00 Rp 1,900.00
Rp 5,525,500.00 Rp 41,441.25
Rp 110,000.00 Rp 19,250.00
Rp 22,500.00 Rp 22,500.00

Rp 80,000.00 Rp 52,800.00
Rp 100,000.00 Rp 33,000.00
Rp 115,000.00 Rp 3,795.00
Rp 105,000.00 Rp 3,465.00

Rp 297,939.50

Rp 5,250,000.00 Rp 105,000.00
Rp 16,250.00 Rp 6,500.00
Rp 9,500.00 Rp 1,900.00
Rp 5,525,500.00 Rp 49,729.50
Rp 110,000.00 Rp 19,250.00
Rp 22,500.00 Rp 22,500.00

Rp 80,000.00 Rp 52,800.00
Rp 100,000.00 Rp 33,000.00
Rp 115,000.00 Rp 3,795.00
Rp 105,000.00 Rp 3,465.00

Rp 334,651.25

Rp 5,250,000.00 Rp 105,000.00
Rp 16,250.00 Rp 6,500.00
Rp 9,500.00 Rp 1,900.00
Rp 5,525,500.00 Rp 41,441.25
Rp 110,000.00 Rp 19,250.00
Rp 22,500.00 Rp 67,500.00

Rp 80,000.00 Rp 52,800.00
Rp 100,000.00 Rp 33,000.00
Rp 115,000.00 Rp 3,795.00

Page 279 of 368


Harga Satuan Jumlah Harga

Rp 105,000.00 Rp 3,465.00

Rp 262,926.25

Rp 5,250,000.00 Rp 78,750.00
Rp 16,250.00 Rp 6,500.00
Rp 9,500.00 Rp 1,425.00
Rp 5,525,500.00 Rp 41,441.25
Rp 110,000.00 Rp 19,250.00
Rp 22,500.00 Rp 22,500.00

Rp 80,000.00 Rp 52,800.00
Rp 100,000.00 Rp 33,000.00
Rp 115,000.00 Rp 3,795.00
Rp 105,000.00 Rp 3,465.00

Page 280 of 368


Harga Satuan Jumlah Harga

Rp 29,585.00

Rp 14,000.00 Rp 16,100.00
Rp 28,000.00 Rp 1,680.00

Rp 80,000.00 Rp 4,800.00
Rp 100,000.00 Rp 6,000.00
Rp 115,000.00 Rp 690.00
Rp 105,000.00 Rp 315.00

Rp 29,865.00

Rp 7,100.00 Rp 7,100.00
Rp 41,250.00 Rp 4,125.00

Rp 80,000.00 Rp 8,000.00
Rp 100,000.00 Rp 10,000.00
Rp 115,000.00 Rp 115.00
Rp 105,000.00 Rp 525.00

Rp 897,620.00

Rp 297,500.00 Rp 357,000.00
Rp 1,060.00 Rp 144,160.00
Rp 340,000.00 Rp 184,960.00

Rp 80,000.00 Rp 120,000.00
Rp 100,000.00 Rp 75,000.00
Rp 115,000.00 Rp 8,625.00
Rp 105,000.00 Rp 7,875.00

Rp 551,220.00

Rp 297,500.00 Rp 357,000.00
Rp 195,000.00 Rp 84,240.00

Page 281 of 368


Harga Satuan Jumlah Harga

Rp 80,000.00 Rp 62,400.00
Rp 100,000.00 Rp 39,000.00
Rp 115,000.00 Rp 4,485.00
Rp 105,000.00 Rp 4,095.00

mp. 1Pc : 5PP Rp 106,035.80

Rp 625.00 Rp 43,750.00
Rp 1,060.00 Rp 10,260.80
Rp 340,000.00 Rp 15,300.00

Rp 80,000.00 Rp 24,000.00
Rp 100,000.00 Rp 10,000.00
Rp 115,000.00 Rp 1,150.00
Rp 105,000.00 Rp 1,575.00

Page 282 of 368


Harga Satuan Jumlah Harga
mp. 1Pe : 3PP Rp 109,307.20

Rp 625.00 Rp 43,750.00
Rp 1,060.00 Rp 15,232.20
Rp 340,000.00 Rp 13,600.00

Rp 80,000.00 Rp 24,000.00
Rp 100,000.00 Rp 10,000.00
Rp 115,000.00 Rp 1,150.00
Rp 105,000.00 Rp 1,575.00

Rp 58,362.56

Rp 1,060.00 Rp 8,242.56
Rp 340,000.00 Rp 7,820.00

Rp 80,000.00 Rp 24,000.00
Rp 100,000.00 Rp 15,000.00
Rp 115,000.00 Rp 1,725.00
Rp 105,000.00 Rp 1,575.00

Rp 57,074.40

Rp 1,060.00 Rp 6,614.40
Rp 340,000.00 Rp 8,160.00

Rp 80,000.00 Rp 24,000.00
Rp 100,000.00 Rp 15,000.00
Rp 115,000.00 Rp 1,725.00
Rp 105,000.00 Rp 1,575.00

Rp 31,645.00

Rp 1,060.00 Rp 3,445.00

Rp 80,000.00 Rp 16,000.00
Rp 100,000.00 Rp 10,000.00
Rp 115,000.00 Rp 1,150.00

Page 283 of 368


Harga Satuan Jumlah Harga

Rp 105,000.00 Rp 1,050.00

Rp 324,698.00

Rp 235,000.00 Rp 246,750.00
Rp 1,060.00 Rp 10,388.00
Rp 340,000.00 Rp 15,300.00
Rp 13,000.00 Rp 16,900.00

Rp 80,000.00 Rp 20,000.00
Rp 100,000.00 Rp 12,500.00
Rp 115,000.00 Rp 1,495.00
Rp 105,000.00 Rp 1,365.00

Page 284 of 368


Harga Satuan Jumlah Harga

Rp 192,925.00

Rp 46,500.00 Rp 48,825.00
Rp 1,060.00 Rp 10,600.00
Rp 340,000.00 Rp 15,300.00
Rp 13,000.00 Rp 19,500.00

Rp 80,000.00 Rp 56,000.00
Rp 100,000.00 Rp 35,000.00
Rp 115,000.00 Rp 4,025.00
Rp 105,000.00 Rp 3,675.00

Rp 220,524.78

Rp 51,250.00 Rp 53,812.50
Rp 19,200.00 Rp 96,000.00
Rp 14,000.00 Rp 4,912.28

Rp 80,000.00 Rp 37,333.33
Rp 100,000.00 Rp 23,333.33
Rp 115,000.00 Rp 2,683.33
Rp 105,000.00 Rp 2,450.00

Rp 381,450.00

Rp 260,000.00 Rp 273,000.00
Rp 16,250.00 Rp 9,750.00

Rp 80,000.00 Rp 56,000.00
Rp 100,000.00 Rp 35,000.00
Rp 115,000.00 Rp 4,025.00
Rp 105,000.00 Rp 3,675.00

Rp 168,230.61

Rp 50,000.00 Rp 52,500.00
Rp 1,962.50 Rp 52,333.33
Rp 4,625.00 Rp 23,125.00
Rp 14,000.00 Rp 4,912.28

Page 285 of 368


Harga Satuan Jumlah Harga

Rp 80,000.00 Rp 20,000.00
Rp 100,000.00 Rp 12,500.00
Rp 115,000.00 Rp 1,495.00
Rp 105,000.00 Rp 1,365.00

Rp 294,230.00

Rp 55,000.00 Rp 57,750.00
Rp 19,200.00 Rp 96,000.00
Rp 14,000.00 Rp 13,580.00

Rp 80,000.00 Rp 72,000.00
Rp 100,000.00 Rp 45,000.00
Rp 115,000.00 Rp 5,175.00
Rp 105,000.00 Rp 4,725.00

Page 286 of 368


Harga Satuan Jumlah Harga

Rp 331,405.00

Rp 112,500.00 Rp 123,750.00
Rp 1,060.00 Rp 12,455.00
Rp 340,000.00 Rp 11,900.00

Rp 80,000.00 Rp 104,000.00
Rp 100,000.00 Rp 65,000.00
Rp 115,000.00 Rp 7,475.00
Rp 105,000.00 Rp 6,825.00

Rp 768,336.40

Rp 477,500.00 Rp 506,150.00
Rp 16,250.00 Rp 48,750.00
Rp 1,060.00 Rp 13,186.40
Rp 340,000.00 Rp 8,500.00
Rp 13,000.00 Rp 8,450.00

Rp 80,000.00 Rp 104,000.00
Rp 100,000.00 Rp 65,000.00
Rp 115,000.00 Rp 7,475.00
Rp 105,000.00 Rp 6,825.00

Rp 8,738,650.00

Rp 6,800,000.00 Rp 7,480,000.00
Rp 13,500.00 Rp 202,500.00
Rp 16,250.00 Rp 48,750.00

Rp 80,000.00 Rp 192,000.00
Rp 100,000.00 Rp 720,000.00
Rp 115,000.00 Rp 82,800.00
Rp 105,000.00 Rp 12,600.00

Rp 150,672.00

Rp 64,000.00 Rp 23,296.00
Rp 10,000.00 Rp 1,500.00

Page 287 of 368


Harga Satuan Jumlah Harga

Rp 1,850.00 Rp 1,036.00
Rp 18,333.33 Rp 66,000.00
Rp 7,000.00 Rp 1,540.00

Rp 80,000.00 Rp 24,000.00
Rp 100,000.00 Rp 30,000.00
Rp 115,000.00 Rp 1,725.00
Rp 105,000.00 Rp 1,575.00

Page 288 of 368


Harga Satuan Jumlah Harga

Rp 12,977.50

Rp 6,500.00 Rp 6,825.00
Rp 1,850.00 Rp 92.50

Rp 80,000.00 Rp 2,400.00
Rp 100,000.00 Rp 3,000.00
Rp 115,000.00 Rp 345.00
Rp 105,000.00 Rp 315.00

Rp 114,137.50

Rp 7,500,000.00 Rp 82,500.00
Rp 16,250.00 Rp 812.50

Rp 80,000.00 Rp 8,000.00
Rp 100,000.00 Rp 20,000.00
Rp 115,000.00 Rp 2,300.00
Rp 105,000.00 Rp 525.00

Rp 142,340.00

Rp 87,500.00 Rp 88,375.00
Rp 340,000.00 Rp 20,400.00

Rp 80,000.00 Rp 16,000.00
Rp 100,000.00 Rp 15,000.00
Rp 115,000.00 Rp 1,725.00
Rp 105,000.00 Rp 840.00

Rp 1,177,350.00

Rp 775,000.00 Rp 852,500.00
Rp 40,000.00 Rp 128,000.00
Rp 30,500.00 Rp 30,500.00
Rp 60,000.00 Rp 9,000.00
Rp 7,000.00 Rp 7,000.00

Page 289 of 368


Harga Satuan Jumlah Harga

Rp 80,000.00 Rp 80,000.00
Rp 100,000.00 Rp 50,000.00
Rp 115,000.00 Rp 4,600.00
Rp 105,000.00 Rp 15,750.00

Rp 1,430,025.00

Rp 106,250.00 Rp 127,500.00
Rp 126,700.00 Rp 506,800.00
Rp 27,500.00 Rp 27,500.00
Rp 635,000.00 Rp 647,700.00
Rp 35,000.00 Rp 35,000.00
Rp 45,000.00 Rp 45,000.00

Rp 80,000.00 Rp 40,000.00
Rp 105,000.00 Rp 525.00

Page 290 of 368


Harga Satuan Jumlah Harga

Rp 633,450.00

Rp 26,000.00 Rp 27,300.00
Rp 87,500.00 Rp 367,500.00
Rp 112,500.00 Rp 118,125.00
Rp 45,000.00 Rp 45,000.00
Rp 35,000.00 Rp 35,000.00

Rp 80,000.00 Rp 40,000.00
Rp 105,000.00 Rp 525.00

Rp 397,100.00

Rp 227,500.00 Rp 227,500.00
Rp 60,000.00 Rp 60,000.00

Rp 80,000.00 Rp 38,400.00
Rp 100,000.00 Rp 64,000.00
Rp 115,000.00 Rp 5,520.00
Rp 105,000.00 Rp 1,680.00

Rp 113,305.00

Rp 82,500.00 Rp 90,750.00
Rp 5,250.00 Rp 10,500.00
Rp 60,000.00 Rp 3,600.00

Rp 80,000.00 Rp 3,440.00
Rp 100,000.00 Rp 4,300.00
Rp 115,000.00 Rp 494.50
Rp 105,000.00 Rp 220.50

Rp 449,068.50

Rp 82,500.00 Rp 363,000.00
Rp 4,750.00 Rp 69,350.00

Rp 80,000.00 Rp 6,800.00

Page 291 of 368


Harga Satuan Jumlah Harga

Rp 100,000.00 Rp 8,500.00
Rp 115,000.00 Rp 977.50
Rp 105,000.00 Rp 441.00

Rp 449,068.50

Rp 82,500.00 Rp 363,000.00
Rp 4,750.00 Rp 69,350.00

Rp 80,000.00 Rp 6,800.00
Rp 100,000.00 Rp 8,500.00
Rp 115,000.00 Rp 977.50
Rp 105,000.00 Rp 441.00

Page 292 of 368


Harga Satuan Jumlah Harga

Rp 1,571,512.50

Rp 82,500.00 Rp 1,204,500.00
Rp 16,250.00 Rp 487.50
Rp 16,250.00 Rp 4,875.00
Rp 87,500.00 Rp 87,500.00

Rp 80,000.00 Rp 48,000.00
Rp 100,000.00 Rp 200,000.00
Rp 115,000.00 Rp 23,000.00
Rp 105,000.00 Rp 3,150.00

Rp 277,012.50

Rp 225,000.00 Rp 247,500.00

Rp 80,000.00 Rp 12,000.00
Rp 100,000.00 Rp 15,000.00
Rp 115,000.00 Rp 1,725.00
Rp 105,000.00 Rp 787.50

Rp 296,262.50

Rp 242,500.00 Rp 266,750.00

Rp 80,000.00 Rp 12,000.00
Rp 100,000.00 Rp 15,000.00
Rp 115,000.00 Rp 1,725.00
Rp 105,000.00 Rp 787.50

Rp 293,003.75

Rp 250,000.00 Rp 275,000.00

Rp 80,000.00 Rp 1,200.00
Rp 100,000.00 Rp 15,000.00
Rp 115,000.00 Rp 1,725.00
Rp 105,000.00 Rp 78.75

Page 293 of 368


Harga Satuan Jumlah Harga

Rp 26,212.50

Rp 7,500.00 Rp 7,500.00

Rp 80,000.00 Rp 1,200.00
Rp 100,000.00 Rp 15,000.00
Rp 115,000.00 Rp 1,725.00
Rp 105,000.00 Rp 787.50

Page 294 of 368


Harga Satuan Jumlah Harga

Rp 48,725.00

Rp 20,000.00 Rp 20,000.00
Rp 16,250.00 Rp 16,250.00

Rp 80,000.00 Rp 800.00
Rp 100,000.00 Rp 10,000.00
Rp 115,000.00 Rp 1,150.00
Rp 105,000.00 Rp 525.00

Rp 222,475.00

Rp 170,000.00 Rp 170,000.00

Rp 80,000.00 Rp 800.00
Rp 100,000.00 Rp 50,000.00
Rp 115,000.00 Rp 1,150.00
Rp 105,000.00 Rp 525.00

Rp 51,237.50

Rp 74,500.00 Rp 74,500.00

Rp 80,000.00 Rp 400.00
Rp 100,000.00 Rp 50,000.00
Rp 115,000.00 Rp 575.00
Rp 105,000.00 Rp 262.50

Rp 21,897.00

Rp 24,000.00 Rp 2,400.00
Rp 37,500.00 Rp 3,750.00
Rp 24,500.00 Rp 6,860.00

Rp 80,000.00 Rp 1,600.00
Rp 100,000.00 Rp 6,300.00
Rp 115,000.00 Rp 724.50
Rp 105,000.00 Rp 262.50

Page 295 of 368


Harga Satuan Jumlah Harga

Rp 21,897.00

Rp 24,000.00 Rp 2,400.00
Rp 37,500.00 Rp 3,750.00
Rp 24,500.00 Rp 6,860.00

Rp 80,000.00 Rp 1,600.00
Rp 100,000.00 Rp 6,300.00
Rp 115,000.00 Rp 724.50
Rp 105,000.00 Rp 262.50

Page 296 of 368


Harga Satuan Jumlah Harga

Rp 113,145.00

Rp 63,000.00 Rp 63,000.00
Rp 23,000.00 Rp 1,150.00
Rp 3,550.00 Rp 355.00
Rp 7,750.00 Rp 77.50

Rp 80,000.00 Rp 16,000.00
Rp 100,000.00 Rp 30,000.00
Rp 115,000.00 Rp 2,300.00
Rp 105,000.00 Rp 262.50

Rp 20,539.50

Rp 37,500.00 Rp 3,750.00
Rp 24,500.00 Rp 6,860.00
Rp 7,750.00 Rp 155.00
Rp 3,550.00 Rp 887.50

Rp 80,000.00 Rp 1,600.00
Rp 100,000.00 Rp 6,300.00
Rp 115,000.00 Rp 724.50
Rp 105,000.00 Rp 262.50

Rp 115,310.00

Rp 5,225.00 Rp 94,050.00

Rp 80,000.00 Rp 12,000.00
Rp 100,000.00 Rp 7,500.00
Rp 115,000.00 Rp 920.00
Rp 105,000.00 Rp 840.00

Rp 119,870.00

Rp 9,200.00 Rp 46,000.00
Rp 1,060.00 Rp 8,480.00
Rp 340,000.00 Rp 10,880.00

Page 297 of 368


Harga Satuan Jumlah Harga

Rp 80,000.00 Rp 32,000.00
Rp 100,000.00 Rp 20,000.00
Rp 115,000.00 Rp 2,300.00
Rp 105,000.00 Rp 210.00

Rp 229,507.50

Rp 155,000.00 Rp 155,000.00
Rp 38,500.00 Rp 38,500.00

Rp 80,000.00 Rp 2,400.00
Rp 100,000.00 Rp 30,000.00
Rp 115,000.00 Rp 3,450.00
Rp 105,000.00 Rp 157.50

Page 298 of 368


Harga Satuan Jumlah Harga

Rp 1,971,585.00

Rp 1,575,000.00 Rp 1,575,000.00
Rp 94,500.00 Rp 5,670.00

Rp 80,000.00 Rp 264,000.00
Rp 100,000.00 Rp 110,000.00
Rp 115,000.00 Rp 115.00
Rp 105,000.00 Rp 16,800.00

Rp 1,047,260.00

Rp 825,000.00 Rp 825,000.00
Rp 247,500.00 Rp 74,250.00
Rp 1,060.00 Rp 6,360.00
Rp 340,000.00 Rp 3,400.00

Rp 80,000.00 Rp 96,000.00
Rp 100,000.00 Rp 14,500.00
Rp 115,000.00 Rp 17,250.00
Rp 105,000.00 Rp 10,500.00

Rp 42,475.00

Rp 30,000.00 Rp 30,000.00

Rp 80,000.00 Rp 800.00
Rp 100,000.00 Rp 10,000.00
Rp 115,000.00 Rp 1,150.00
Rp 105,000.00 Rp 525.00

Rp 77,550.00

Rp 35,000.00 Rp 35,000.00
Rp 3,000.00 Rp 75.00

Rp 80,000.00 Rp 800.00
Rp 100,000.00 Rp 40,000.00

Page 299 of 368


Harga Satuan Jumlah Harga

Rp 115,000.00 Rp 1,150.00
Rp 105,000.00 Rp 525.00

Rp 2,637,940.00

Rp 2,450,000.00 Rp 2,450,000.00
Rp 490,000.00 Rp 98,000.00

Rp 80,000.00 Rp 6,000.00
Rp 100,000.00 Rp 75,000.00
Rp 115,000.00 Rp 8,625.00
Rp 105,000.00 Rp 315.00

Page 300 of 368


Harga Satuan Jumlah Harga

Rp 377,015.20

Rp 283,000.00 Rp 283,000.00
Rp 33,960.00 Rp 4,075.20

Rp 80,000.00 Rp 6,000.00
Rp 100,000.00 Rp 75,000.00
Rp 115,000.00 Rp 8,625.00
Rp 105,000.00 Rp 315.00

Rp 30,278.75

Rp 15,500.00 Rp 18,600.00
Rp 5,425.00 Rp 1,898.75

Rp 80,000.00 Rp 2,880.00
Rp 100,000.00 Rp 6,000.00
Rp 115,000.00 Rp 690.00
Rp 105,000.00 Rp 210.00

Rp 73,199.38

Rp 38,750.00 Rp 46,500.00
Rp 13,562.50 Rp 4,746.88

Rp 80,000.00 Rp 6,480.00
Rp 100,000.00 Rp 13,500.00
Rp 115,000.00 Rp 1,552.50
Rp 105,000.00 Rp 420.00

Rp 85,823.75

Rp 57,500.00 Rp 69,000.00
Rp 20,125.00 Rp 7,043.75

Rp 80,000.00 Rp 2,880.00
Rp 100,000.00 Rp 6,000.00
Rp 115,000.00 Rp 690.00

Page 301 of 368


Harga Satuan Jumlah Harga

Rp 105,000.00 Rp 210.00

Rp 261,175.00

Rp 47,500.00 Rp 47,500.00

Rp 100,000.00 Rp 210,000.00
Rp 105,000.00 Rp 3,675.00

Page 302 of 368


Harga Satuan Jumlah Harga

Rp 285,175.00

Rp 71,500.00 Rp 71,500.00

Rp 100,000.00 Rp 210,000.00
Rp 105,000.00 Rp 3,675.00

Rp 343,175.00

Rp 129,500.00 Rp 129,500.00

Rp 100,000.00 Rp 210,000.00
Rp 105,000.00 Rp 3,675.00

Rp 393,675.00

Rp 180,000.00 Rp 180,000.00

Rp 100,000.00 Rp 210,000.00
Rp 105,000.00 Rp 3,675.00

Rp 366,175.00

Rp 152,500.00 Rp 152,500.00

Rp 100,000.00 Rp 210,000.00
Rp 105,000.00 Rp 3,675.00

Rp 255,675.00

Rp 42,000.00 Rp 42,000.00

Rp 100,000.00 Rp 210,000.00
Rp 105,000.00 Rp 3,675.00

Page 303 of 368


Harga Satuan Jumlah Harga

Rp 236,925.00

Rp 23,250.00 Rp 23,250.00

Rp 100,000.00 Rp 210,000.00
Rp 105,000.00 Rp 3,675.00

Rp 243,175.00

Rp 29,500.00 Rp 29,500.00

Rp 100,000.00 Rp 210,000.00
Rp 105,000.00 Rp 3,675.00

Page 304 of 368


Harga Satuan Jumlah Harga

Rp 241,675.00

Rp 28,000.00 Rp 28,000.00

Rp 100,000.00 Rp 210,000.00
Rp 105,000.00 Rp 3,675.00

Rp 263,675.00

Rp 50,000.00 Rp 50,000.00

Rp 100,000.00 Rp 210,000.00
Rp 105,000.00 Rp 3,675.00

Rp 427,945.00

Rp 4,100.00 Rp 12,300.00
Rp 4,600.00 Rp 69,000.00
Rp 550.00 Rp 550.00
Rp 550.00 Rp 1,100.00
Rp 55.00 Rp 1,320.00
Rp 130,000.00 Rp 130,000.00

Rp 100,000.00 Rp 210,000.00
Rp 105,000.00 Rp 3,675.00

Rp 83,795.00

Rp 11,200.00 Rp 12,320.00

Rp 100,000.00 Rp 67,800.00
Rp 105,000.00 Rp 3,675.00

Rp 3,876,175.00

Rp 3,662,500.00 Rp 3,662,500.00

Page 305 of 368


Harga Satuan Jumlah Harga

Rp 100,000.00 Rp 210,000.00
Rp 105,000.00 Rp 3,675.00

Page 306 of 368


D. DAFTAR HARGA SATUAN PEKERJAAN

PEKERJAAN : PEMBANGUNAN RUMAH 3 LANTAI


LOKASI : JL. WOLTER MONGINSIDI, NO. 23, SEMARANG

No Uraian & Indeks Koefisien

I. PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan
2 Pengukuran dan Pasang Papan Bowplank
3 Pembuatan gudang semen dan alat-alat
4 Pagar sementara dari seng gelombang tinggi 2 m
5 Papan Nama Proyek

II. PEKERJAAN TANAH


1 Menggali Tanah Biasa Sedalam 1 m
2 Menggali Tanah Biasa Sedalam 2 m
3 Mengurug TANAH Padat untuk Peninggian Lantai Bangunan
4 Urugan pasir
5 Urugan tanah kembali

III. PEKERJAAN STRUKTUR


1 Membuat Lantai Kerja Beton mutu f'c=7,4 MPa (K100), slum (3-6)cm, w/c = 0,87
2 Membuat beton mutu fc = 19.3 Mpa (K225). slum (12+2) cm. w/c = 0.58
3 Membuat beton mutu fc = 21.7 Mpa (K250). slum (12+2) cm. w/c = 0.56
4 10 Kg Pembesian dg Besi Polos atau Besi Ulir
5 Memasang Bekisting Untuk Pondasi 2x pakai
6 Memasang Bekisting untuk Sloof 2x pakai
7 Memasang Bekisting untuk Kolom 2x pakai
8 Memasang Bekisting untuk Balok 2x pakai
9 Memasang Bekisting untuk Lantai 2x pakai
10 Memasang Bekisting untuk Tangga 2x pakai
11 1 Kg Memasang Besi Profil
12 1 Kg Mengerjakan Pekerjaan Perakitan (kuda-kuda Baja)

IV. PEKERJAAN ARSITEKTUR


1 Memasanq Pondasi Batu Kali 1Pc : 5 Psr
2 Pasangan batu kosong
3 Memasang Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1/2 Bata Camp. 1Pc : 5PP
4 Memasang Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1/2 Bata Camp. 1Pe : 3PP
5 Memasang Plesteran 1 Pc : 3 Pp Tebal 15 mm
6 Memasang Plesteran 1 PC : 4 Pp Tebal 15 mm
7 Memasang Acian
8 Memasang lantai Ubin Granito Uk. 40 x 40 cm
9 Memasang Lantai Keramik 30 x 30 cm

Page 307 of 368


No Uraian & Indeks Koefisien

10 Memasang Lantai Keramik 20 x 20 cm (area basah) dengn semen khusus


11 Memasang Lantai Parquet Jati
12 Memasang Lantai Mozaik
13 Memasang Dind Keramik 20 x 40 cm (area basah) dengn semen khusus
14 Memasang Dinding Batu Paros / Batu Tempel Hitam
15 Memasang Dinding Marmer Ukuran 1.00 x 1.00 cm
16 Memasang konstruksi Gording. Kayu Klas II
17 Memasang Langit-langit Gypsum Board, Uk (120 x 240) tebal 9 mm
18 List Langit-langit Profil gypsum

Page 308 of 368


No Uraian & Indeks Koefisien

19 Memasang Listplank Uk. (3x30)cm Kayu klas I atau II


20 Memasang Paving Blok
21 Memasang Aluminium Composite Panel ( ACP) Ornamen
22 Memasang Railling pipa Tangga & void
23 Memasang Railling pipa
24 Memasang Kaca Tempered t=8 mm
25 Memasang Kusen Allumunium Natural
26 Pemasangan Pintu Allumunium Strip Lebar 8 cm
27 Pemasangan Jendela Allumunium Strip Lebar 8 cm
28 Pasang Pintu Taekwood Rangkap, rangka alumunium
29 Memasang Kaca Clear t = 5 mm
30 Memasang Kaca Buram t = 5 mm
31 Memasang Kaca Cermin t = 5 mm
32 Buah Engsel Pintu
33 Buah Pemasangan Engsel Jendela Kupu-kupu
34 Pemasangan Kunci Tanam Biasa
35 Pemasangan Kunci Geser
36 Pengecat Tembok Baru (1lap.Plamir, 1 lap Cat Dasar,2 lap, cat penutup ) eksterior
37 Pengecat Tembok Baru (1lap.Plamir, 1 lap Cat Dasar, 2 lap, cat penutup ) Interior
38 Pengecatan Bidang Kayu dengan Plitur jadi
39 Pengecat Plafond Baru (1 lap Cat Dasar, 2 lap cat penutup) interior
40 Pasang Genteng plentong glazur
41 Pasang Atap Nok Genteng plentong glazur

V. PEKERJAAN MEKANIKAL ELEKTRIKAL & PELAMBING


1 Memasang Bak Cuci Piring Stailes Steel
2 Memasang Closet Duduk / Mono Blok
3 Memasang Wastafel
4 Memasang Floor Drain
5 Memasang Kran Air Ø ½" a
6 Pemasangan Bathcuip porselen
7 Pemasangan Bak Fibreglass vol.1 m³
8 Pemasangan Pipa PVC tipe AW Ø ½"
9 Pemasangan Pipa PVC tipe AW Ø 3"
10 Pemasangan Pipa PVC tipe AW Ø 4"
11 Pemasangan Lampu Down Light E27 Ess 8 Watt
12 Pemasangan Lampu Down Light E27 Ess 18 Watt
13 Pemasangan Lampu TL Balk 1 x 36 Watt
14 Pemasangan Baret E27 Ess 18 Watt
15 Pemasangan Ceiling Exhaust Fan
16 Pemasangan Saklar Ganda
17 Pemasangan Saklar Tunggal
18 Pemasangan Saklar Tukar/Hotel

Page 309 of 368


No Uraian & Indeks Koefisien

19 Pemasangan Stop kontak 16A.200W.1PH


20 Pemasangan Stop kontak 16A.200W.2PH
21 Pemasangan MCB
22 Pemasangan Kabel NYM 2 x 2.5
23 Pemasangan Indoor Unit Ac, Wall Mounted Type

Page 310 of 368


Sat. Harga Satuan

m² Rp 13,250.00
m³ Rp 138,981.00
m² Rp 999,955.00
m' Rp 355,325.00
unit Rp 273,487.50

m³ Rp 62,625.00
m³ Rp 76,725.00
m³ Rp 184,625.00
m³ Rp 259,050.00
m³ Rp 45,250.00

m³ Rp 875,547.86
m³ Rp 1,032,320.69
m³ Rp 1,042,382.55
kg Rp 150,550.00
m² Rp 184,145.00
m² Rp 197,270.00
m² Rp 289,651.25
m² Rp 297,939.50
m² Rp 334,651.25
m² Rp 262,926.25
kg Rp 29,585.00
kg Rp 29,865.00

m³ Rp 897,620.00
m³ Rp 551,220.00
m² Rp 106,035.80
m² Rp 109,307.20
m² Rp 58,362.56
m² Rp 57,074.40
m² Rp 31,645.00
m² Rp 324,698.00
m² Rp 192,925.00

Page 311 of 368


Sat. Harga Satuan
m² Rp 220,524.78
m² Rp 381,450.00
m² Rp 168,230.61
m² Rp 294,230.00
m² Rp 331,405.00
m² Rp 768,336.40
m³ Rp 8,738,650.00
m² Rp 150,672.00
m' Rp 12,977.50

Page 312 of 368


Sat. Harga Satuan

m' Rp 114,137.50
m² Rp 142,340.00
m² Rp 1,177,350.00
m' Rp 1,430,025.00
m' Rp 633,450.00
m² Rp 397,100.00
m' Rp 113,305.00
m² Rp 449,068.50
m² Rp 449,068.50
m² Rp 1,571,512.50
m² Rp 277,012.50
m² Rp 296,262.50
m² Rp 293,003.75
buah Rp 26,212.50
buah Rp 48,725.00
buah Rp 222,475.00
buah Rp 51,237.50
m² Rp 21,897.00
m² Rp 21,897.00
m² Rp 113,145.00
m² Rp 20,539.50
m² Rp 115,310.00
m' Rp 119,870.00

buah Rp 229,507.50
buah Rp 1,971,585.00
buah Rp 1,047,260.00
buah Rp 42,475.00
buah Rp 77,550.00
unit Rp 2,637,940.00
unit Rp 377,015.20
m' Rp 30,278.75
m' Rp 73,199.38
m' Rp 85,823.75
titik Rp 261,175.00
titik Rp 285,175.00
titik Rp 343,175.00
titik Rp 393,675.00
buah Rp 366,175.00
buah Rp 255,675.00
buah Rp 236,925.00
buah Rp 243,175.00

Page 313 of 368


Sat. Harga Satuan

buah Rp 241,675.00
buah Rp 263,675.00
unit Rp 427,945.00
m' Rp 83,795.00
unit Rp 3,876,175.00

Page 314 of 368


E. JUMLAH HARGA PENAWARAN

PEKERJAAN : PEMBANGUNAN RUMAH 3 LANTAI


LOKASI : JL. WOLTER MONGINSIDI, NO. 23, SEMARANG

NO. URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN

I. PEKERJAAN PERSIAPAN TOTAL PER. :

1 Pembersihan lahan + tebang pohon 629.000 m² Rp 13,250.00


2 Uitzet dan Bowplank 112.000 m' Rp 138,981.00
3 Pembuatan Pagar seng pengaman proyek finish cat 116.000 m' Rp 355,325.00
4 Air kerja 1.000 ls Rp 2,500,000.00
5 Listrik kerja 1.000 ls Rp 4,000,000.00
6 Pembuatan gudang material /alat 9.000 m² Rp 999,955.00
7 Papan nama proyek 1.000 m² Rp 273,487.50
8 Administrasi dan Dokumentasi 1.000 unit Rp 5,000,000.00

II. PEKERJAAN TANAH TOTAL PT. :

1 Galian tanah pondasi batu belah 285.208 m³ Rp 62,625.00


2 Galian tanah pondasi footplat 98.339 m³ Rp 76,725.00
3 Urugan peninggian tanah 417.405 m³ Rp 184,625.00
4 Urugan pasir bawah lantai 42.488 m³ Rp 259,050.00
5 Urugan pasir bawah pondasi 36.104 m³ Rp 259,050.00
6 Urugan tanah kembali 217.157 m³ Rp 45,250.00

III. PEKERJAAN STRUKTUR

A SUB STRUKTUR TOTAL SUB. :

1 Lantai kerja 8.21 m³ Rp 875,547.86


2 Footplat tangga
- Beton K-250 0.45 m³ Rp 1,042,382.55
- Besi 110.88 Kg Rp 15,055.00
- Bekisting 3.81 m² Rp 184,145.00
3 Footplat type P1
- Beton K-250 2.70 m³ Rp 1,042,382.55
- Besi 171.69 Kg Rp 15,055.00
- Bekisting 7.20 m² Rp 184,145.00
4 Footplat type P2
- Beton K-250 12.80 m³ Rp 1,042,382.55

Page 315 of 368


NO. URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN

- Besi 579.94 Kg Rp 15,055.00


- Bekisting 25.60 m² Rp 184,145.00
5 Footplat type P3
- Beton K-250 7.20 m³ Rp 1,042,382.55
- Besi 215.58 Kg Rp 15,055.00
- Bekisting 19.20 m² Rp 184,145.00

Page 316 of 368


NO. URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN

6 Kolom pedestal (40x40)


- Beton K-250 6.96 m³ Rp 1,042,382.55
- Besi 1,306.19 Kg Rp 15,055.00
- Bekisting 69.60 m² Rp 289,651.25
7 Kolom pedestal (15x15)
- Beton K-255 1.25 m³ Rp 1,032,320.69
- Besi 569.46 Kg Rp 15,055.00
- Bekisting 33.06 m² Rp 289,651.25
8 Sloof BS1 (25x40)
- Beton K-250 6.93 m³ Rp 1,042,382.55
- Besi 1,366.64 Kg Rp 15,055.00
- Bekisting 72.45 m² Rp 197,270.00
9 Sloof BSP (15x25)
- Beton K-250 4.15 m³ Rp 1,042,382.55
- Besi 824.35 Kg Rp 15,055.00
- Bekisting 56.66 m² Rp 197,270.00

B PEKERJAAN STRUKTUR ATAS

- LANTAI 1 TOTAL LT. 1 :

1 Kolom (40x40)
- Beton K-250 8.38 m³ Rp 1,042,382.55
- Besi 1,543.22 Kg Rp 15,055.00
- Bekisting 84.00 m² Rp 289,651.25
2 Kolom (15x15)
- Beton K-255 1.52 m³ Rp 1,032,320.69
- Besi 463.15 Kg Rp 15,055.00
- Bekisting 39.90 m² Rp 289,651.25
3 Kolom pagar (15x15)
- Beton K-255 2.37 m³ Rp 1,032,320.69
- Besi 725.97 Kg Rp 15,055.00
- Bekisting 62.10 m² Rp 289,651.25
4 Ringbalk pagar (15x15)
- Beton K-255 1.47 m³ Rp 1,032,320.69
- Besi 196.66 Kg Rp 15,055.00
- Bekisting 14.11 m² Rp 289,651.25
5 Ringbalk dinding kolam (15x15)
- Beton K-255 1.06 m³ Rp 1,032,320.69
- Besi 196.95 Kg Rp 15,055.00
- Bekisting 14.11 m² Rp 289,651.25
6 Tangga utama

Page 317 of 368


NO. URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN

- Beton K-250 4.75 m³ Rp 1,042,382.55


- Besi 657.45 Kg Rp 15,055.00
- Bekisting 25.33 m² Rp 262,926.25

Page 318 of 368


NO. URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN

7 Plat lantai gazebo


- Beton K-250 2.64 m³ Rp 1,042,382.55
- Besi 1,137.43 Kg Rp 15,055.00
- Bekisting 26.45 m² Rp 334,651.25

- LANTAI 2 TOTAL LT. 2 :

1 Kolom (40x40)
- Beton K-250 9.56 m³ Rp 1,042,382.55
- Besi 1,737.05 Kg Rp 15,055.00
- Bekisting 96.00 m² Rp 289,651.25
2 Kolom (15x15)
- Beton K-225 1.91 m³ Rp 1,032,320.69
- Besi 576.38 Kg Rp 15,055.00
- Bekisting 50.40 m² Rp 289,651.25
3 Balok (25x55)
- Beton K-250 4.29 m³ Rp 1,042,382.55
- Besi 689.11 Kg Rp 15,055.00
- Bekisting 43.94 m² Rp 297,939.50
4 Balok (25x50)
- Beton K-250 11.81 m³ Rp 1,042,382.55
- Besi 1,902.49 Kg Rp 15,055.00
- Bekisting 123.25 m² Rp 297,939.50
5 Balok (20x40)
- Beton K-250 2.40 m³ Rp 1,042,382.55
- Besi 490.96 Kg Rp 15,055.00
- Bekisting 32.55 m² Rp 297,939.50
6 Tangga utama
- Beton K-250 5.11 m³ Rp 1,042,382.55
- Besi 660.12 Kg Rp 15,055.00
- Bekisting 25.33 m² Rp 262,926.25
7 Plat lantai 2
- Beton K-250 26.80 m³ Rp 1,042,382.55
- Besi 9,604.70 Kg Rp 15,055.00
- Bekisting 223.33 m² Rp 334,651.25

- LANTAI 3 TOTAL LT. 3 :

1 Kolom (40x40)
- Beton K-250 8.37 m³ Rp 1,042,382.55
- Besi 1,556.37 Kg Rp 15,055.00
- Bekisting 84.00 m² Rp 289,651.25

Page 319 of 368


NO. URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN

2 Kolom (15x15)
- Beton K-225 1.12 m³ Rp 1,032,320.69
- Besi 332.00 Kg Rp 15,055.00
- Bekisting 29.40 m² Rp 289,651.25

Page 320 of 368


NO. URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN

3 Balok (25x55)
- Beton K-250 4.29 m³ Rp 1,042,382.55
- Besi 689.11 Kg Rp 15,055.00
- Bekisting 43.94 m² Rp 297,939.50
4 Balok (25x50)
- Beton K-250 7.36 m³ Rp 1,042,382.55
- Besi 1,189.80 Kg Rp 15,055.00
- Bekisting 76.88 m² Rp 297,939.50
5 Balok (20x40)
- Beton K-250 2.40 m³ Rp 1,042,382.55
- Besi 490.96 Kg Rp 15,055.00
- Bekisting 32.55 m² Rp 297,939.50
6 Balok RB (20x40)
- Beton K-250 1.38 m³ Rp 1,042,382.55
- Besi 253.93 Kg Rp 15,055.00
- Bekisting 18.30 m² Rp 297,939.50
7 Balok RB (15x30)
- Beton K-250 0.15 m³ Rp 1,042,382.55
- Besi 31.94 Kg Rp 15,055.00
- Bekisting 2.83 m² Rp 297,939.50
8 Plat lantai 3
- Beton K-250 17.09 m³ Rp 1,042,382.55
- Besi 6,125.28 Kg Rp 15,055.00
- Bekisting 142.43 m² Rp 334,651.25
9 Plat dak atap
- Beton K-250 1.29 m³ Rp 1,042,382.55
- Besi 556.47 Kg Rp 15,055.00
- Bekisting 12.94 m² Rp 334,651.25

- RING BALK TOTAL RB. :

1 Balok RB (20x40)
- Beton K-250 2.42 m³ Rp 1,042,382.55
- Besi 613.19 Kg Rp 15,055.00
- Bekisting 34.72 m² Rp 297,939.50
2 Balok RB (15x30)
- Beton K-250 0.86 m³ Rp 1,042,382.55
- Besi 191.19 Kg Rp 15,055.00
- Bekisting 15.67 m² Rp 297,939.50

- ATAP TOTAL ATP. :

Page 321 of 368


NO. URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN

1 Kuda-kuda type K
- 2L.60.60.6 361.31 Kg Rp 29,585.00
- 2L.50.50.5 673.62 Kg Rp 29,585.00
- Jarum Gording Ø10 mm 20.42 Kg Rp 15,055.00

Page 322 of 368


NO. URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN

2 Kuda-kuda type K'


- 2L.60.60.6 170.56 Kg Rp 29,585.00
- 2L.50.50.5 424.73 Kg Rp 29,585.00
- Jarum Gording Ø10 mm 6.81 Kg Rp 15,055.00
3 Kuda-kuda type J
- 2L.60.60.6 326.37 Kg Rp 29,585.00
- 2L.50.50.5 575.45 Kg Rp 29,585.00
- Jarum Gording Ø10 mm 18.25 Kg Rp 15,055.00
4 Gording (2C.125.50.20.2,3) 3,605.69 Kg Rp 29,585.00
5 Nok (2C.125.50.20.2,3) 124.90 Kg Rp 29,585.00

IV. PEKERJAAN ARSITEKTUR

- LANTAI 1 TOTAL LT. 1 :

A PEKERJAAN PASANGAN SUB. TOTAL :

1 Pasangan batu belah 1 : 5 79.51 m² Rp 897,620.00


2 Pasangan aanstamping 34.57 m² Rp 551,220.00
3 Pasangan rollag batu kali 1 : 5 12.14 m² Rp 897,620.00
4 Pasangan dinding batu bata 1 : 5 764.94 m² Rp 106,035.80
5 Pasangan dinding batu bata 1 : 3 27.00 m² Rp 109,307.20
6 Pasangan keramik dinding kamar mandi (20X40) 21.15 m² Rp 294,230.00
7 Pasangan Keramik mozaik kolam ikan 129.93 m² Rp 168,230.61
8 Pasangan batu alam 54.51 m² Rp 331,405.00

B PEKERJAAN PLESTERAN DAN ACIAN SUB. TOTAL :

1 Plesteran dinding batu bata 1 : 5 (1 : 4) 1,529.87 m² Rp 57,074.40


2 Plesteran dinding batu bata 1 : 3 (1 : 3) 54.00 m² Rp 58,362.56
3 Acian dinding batu bata 1 : 5 1,345.44 m² Rp 31,645.00
4 Acian dinding batu bata 1 : 3 32.85 m² Rp 31,645.00

C PEKERJAAN LANTAI SUB. TOTAL :

1 Pasangan keramik (40x40) 214.00 m² Rp 324,698.00


2 Pasangan keramik (30x30) 41.87 m² Rp 192,925.00
3 Pasangan Keramik kamar mandi (20x20) 5.47 m² Rp 220,524.78
4 Pasangan lantai parket kayu 17.22 m² Rp 381,450.00
5 Pasangan paving block 104.58 m² Rp 142,340.00

Page 323 of 368


NO. URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN

D PEKERJAAN PINTU DAN JENDELA SUB. TOTAL :

1 Pintu jendela type PJ1


- Kusen alumunium 18.05 m' Rp 113,305.00
- Daun pintu 3.15 m² Rp 449,068.50
- Daun jendela 4.13 m² Rp 449,068.50
- Kaca bening t = 5 mm 6.42 m² Rp 277,012.50
- Engsel Jendela 7.00 buah Rp 48,725.00
- Kunci Jendela geser 3.00 buah Rp 51,237.50
- Engsel pintu 6.00 buah Rp 26,212.50
- Kunci pintu tanam 1.00 buah Rp 222,475.00

2 Pintu jendela type PJ2


- Kusen alumunium 20.20 m' Rp 113,305.00
- Daun pintu 1.62 m² Rp 449,068.50
- Daun jendela 2.60 m² Rp 449,068.50
- Kaca bening t = 5 mm 6.67 m² Rp 277,012.50
- Engsel Jendela 4.00 buah Rp 48,725.00
- Kunci Jendela geser 2.00 buah Rp 51,237.50
- Engsel Pintu 3.00 buah Rp 26,212.50
- Kunci pintu tanam 1.00 buah Rp 222,475.00

3 Pintu type P1
- Kusen alumunium 15.60 m' Rp 113,305.00
- Daun pintu 5.04 m² Rp 1,571,512.50
- Engsel Pintu 9.00 buah Rp 26,212.50
- Kunci pintu tanam 3.00 buah Rp 222,475.00

4 Pintu type P2 3.00 unit Rp 355,000.00

5 Jendela type J1
- Kusen alumunium 12.10 m' Rp 113,305.00
- Daun jendela 4.37 m² Rp 449,068.50
- Kaca bening t = 5 mm 3.67 m² Rp 277,012.50
- Engsel Jendela 4.00 buah Rp 48,725.00
- Kunci Jendela geser 2.00 buah Rp 51,237.50

6 Jendela type J2
- Kusen alumunium 9.10 m' Rp 113,305.00
- Daun jendela 1.38 m² Rp 449,068.50
- Kaca bening t = 5 mm 2.53 m² Rp 277,012.50
- Engsel Jendela 2.00 buah Rp 48,725.00

Page 324 of 368


NO. URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN

- Kunci Jendela geser 1.00 buah Rp 51,237.50

Page 325 of 368


NO. URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN

7 Jendela type J3
- Kusen alumunium 15.80 m' Rp 113,305.00
- Daun jendela 6.75 m² Rp 449,068.50
- Kaca bening t = 5 mm 5.81 m² Rp 277,012.50
- Engsel Jendela 6.00 buah Rp 48,725.00
- Kunci Jendela geser 3.00 buah Rp 51,237.50

8 Jendela type J4
- Kusen alumunium 6.20 m' Rp 113,305.00
- Daun jendela 1.90 m² Rp 449,068.50
- Kaca bening t = 5 mm 1.62 m² Rp 277,012.50
- Engsel Jendela 2.00 buah Rp 48,725.00
- Kunci Jendela geser 1.00 buah Rp 51,237.50

9 Jendela type BV
- Kusen alumunium 6.60 m' Rp 113,305.00
- Kaca buram t = 5 mm 0.60 m² Rp 296,262.50

E PEKERJAAAN PELAFOND SUB. TOTAL :

1 Plafond gypsum board t = 9 mm + metal frame 184.06 m² Rp 150,672.00


2 List tepi plafond profil gypsum 148.10 m' Rp 12,977.50

F PEKERJAAN RAILLING DAN ACP SUB. TOTAL :

1 Railling tangga & void 11.28 m' Rp 1,430,025.00


2 Railling gazebo 8.10 m' Rp 633,450.00
3 Railling balkon 9.20 m' Rp 633,450.00
4 Pasangan ACP + rangka 100.85 m² Rp 1,177,350.00

G PEKERJAAN CAT SUB. TOTAL :

1 Pengecatan dinding luar (exterior) 607.50 m² Rp 21,897.00


2 Pengecatan dinding dalam (interior) 432.52 m² Rp 21,897.00
3 Pengecatan plafond 184.06 m² Rp 20,539.50
4 Pengecatan plitur kayu atap gazebo 19.95 m² Rp 113,145.00

- LANTAI 2 TOTAL LT. 2 :

A PEKERJAAN PASANGAN SUB. TOTAL :

1 Pasangan dinding batu bata 1 : 5 375.99 m² Rp 106,035.80

Page 326 of 368


NO. URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN

2 Pasangan dinding batu bata 1 : 3 34.50 m² Rp 109,307.20


3 Pasangan keramik dinding kamar mandi (20X40) 28.65 m² Rp 294,230.00
4 Pasangan batu alam 7.40 m² Rp 331,405.00

Page 327 of 368


NO. URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN

B PEKERJAAN PLESTERAN DAN ACIAN SUB. TOTAL :

1 Plesteran dinding batu bata 1 : 5 (1 : 4) 751.99 m² Rp 57,074.40


2 Plesteran dinding batu bata 1 : 3 (1 : 3) 69.00 m² Rp 58,362.56
3 Acian dinding batu bata 1 : 5 744.59 m² Rp 31,645.00
4 Acian dinding batu bata 1 : 3 40.35 m² Rp 31,645.00

C PEKERJAAN LANTAI SUB. TOTAL :

1 Pasangan keramik (40x40) 117.60 m² Rp 324,698.00


2 Pasangan keramik kamar mandi (20x20) 10.17 m² Rp 220,524.78
3 Pasangan lantai parket kayu roof garden 42.05 m² Rp 381,450.00

D PEKERJAAN PINTU DAN JENDELA SUB. TOTAL :

1 Pintu jendela type PJ3


- Kusen alumunium 27.70 m' Rp 113,305.00
- Daun pintu 1.68 m² Rp 449,068.50
- Daun jendela 11.76 m² Rp 449,068.50
- Kaca bening t = 5 mm 11.38 m² Rp 277,012.50
- Engsel Jendela 14.00 buah Rp 48,725.00
- Kunci Jendela geser 9.00 buah Rp 51,237.50
- Engsel pintu 3.00 buah Rp 26,212.50
- Kunci pintu tanam 1.00 buah Rp 222,475.00

2 Pintu jendela type PJ4


- Kusen alumunium 24.30 m' Rp 113,305.00
- Daun pintu 1.68 m² Rp 449,068.50
- Daun jendela 4.10 m² Rp 449,068.50
- Kaca bening t = 5 mm 8.09 m² Rp 277,012.50
- Engsel Jendela 6.00 buah Rp 48,725.00
- Kunci Jendela geser 4.00 buah Rp 51,237.50
- Engsel pintu 3.00 buah Rp 26,212.50
- Kunci pintu tanam 1.00 buah Rp 222,475.00

3 Pintu type P1
- Kusen alumunium 26.00 m' Rp 113,305.00
- Daun pintu 8.40 m² Rp 1,571,512.50
- Engsel pintu 15.00 buah Rp 26,212.50
- Kunci pintu tanam 5.00 buah Rp 222,475.00

4 Pintu type P2 3.00 unit Rp 355,000.00

Page 328 of 368


NO. URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN

Page 329 of 368


NO. URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN

5 Jendela type J5
- Kusen alumunium 20.60 m' Rp 113,305.00
- Daun jendela 7.60 m² Rp 449,068.50
- Kaca bening t = 5 mm 6.48 m² Rp 277,012.50
- Engsel jendela 4.00 buah Rp 48,725.00
- Kunci jendela geser 2.00 buah Rp 51,237.50

6 Jendela type BV
- Kusen alumunium 4.40 m' Rp 113,305.00
- Kaca buram t = 5 mm 0.40 m² Rp 296,262.50

7 Jendela type BV1


- Kusen alumunium 3.20 m' Rp 113,305.00
- Kaca buram t = 5 mm 0.40 m² Rp 296,262.50

E PEKERJAAAN PELAFOND SUB. TOTAL :

1 Plafond gypsum board t = 9 mm + metal frame 115.41 m² Rp 150,672.00


2 List tepi plafond profil gypsum 131.40 m' Rp 12,977.50

F PEKERJAAN RAILLING DAN ACP SUB. TOTAL :

1 Railling tangga & void 11.28 m' Rp 1,430,025.00


2 Railling balkon 9.60 m' Rp 633,450.00
3 Pasangan ACP + rangka 110.30 m² Rp 1,177,350.00

G PEKERJAAN CAT SUB. TOTAL :

1 Pengecatan dinding luar (exterior) 397.24 m² Rp 21,897.00


2 Pengecatan dinding dalam (interior) 375.99 m² Rp 21,897.00
3 Pengecatan plafond 115.41 m² Rp 20,539.50
4 Pengecatan pelitur kayu pagar roof garden 104.17 m² Rp 113,145.00

- LANTAI 3 TOTAL LT. 3 :

A PEKERJAAN PASANGAN SUB. TOTAL :

1 Pasangan dinding batu bata 1 : 5 286.56 m² Rp 106,035.80


2 Pasangan dinding batu bata 1 : 3 21.00 m² Rp 109,307.20
3 Pasangan keramik dinding kamar mandi (20X40) 17.10 m² Rp 294,230.00
5 Pasangan batu alam 7.40 m² Rp 331,405.00

Page 330 of 368


NO. URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN

B PEKERJAAN PLESTERAN DAN ACIAN SUB. TOTAL :

1 Plesteran dinding batu bata 1 : 5 (1 : 4) 573.12 m² Rp 57,074.40


2 Plesteran dinding batu bata 1 : 3 (1 : 3) 42.00 m² Rp 58,362.56
3 Acian dinding batu bata 1 : 5 549.46 m² Rp 31,645.00
4 Acian dinding batu bata 1 : 3 24.90 m² Rp 31,645.00

C PEKERJAAN LANTAI SUB. TOTAL :

1 Pasangan keramik (40x40) 116.51 m² Rp 324,698.00


2 Pasangan keramik kamar mandi (20x20) 5.82 m² Rp 220,524.78

D PEKERJAAN PINTU DAN JENDELA SUB. TOTAL :

1 Pintu jendela type PJ4


- Kusen alumunium 24.30 m' Rp 113,305.00
- Daun pintu 1.68 m² Rp 449,068.50
- Daun jendela 4.10 m² Rp 449,068.50
- Kaca bening t = 5 mm 8.09 m² Rp 277,012.50
- Engsel Jendela 6.00 buah Rp 48,725.00
- Kunci Jendela geser 4.00 buah Rp 51,237.50
- Engsel pintu 3.00 buah Rp 26,212.50
- Kunci pintu tanam 1.00 buah Rp 222,475.00

2 Pintu type P1
- Kusen alumunium 20.80 m' Rp 113,305.00
- Daun pintu 6.72 m² Rp 1,571,512.50
- Engsel pintu 12.00 buah Rp 26,212.50
- Kunci pintu tanam 4.00 buah Rp 222,475.00

3 Pintu type P2 2.00 unit Rp 355,000.00

4 Jendela type J5
- Kusen alumunium 51.50 m' Rp 113,305.00
- Daun jendela 19.00 m² Rp 449,068.50
- Kaca bening t = 5 mm 16.20 m² Rp 277,012.50
- Engsel jendela 20.00 buah Rp 48,725.00
- Kunci jendela geser 10.00 buah Rp 51,237.50

5 Jendela type J6
- Kusen alumunium 30.40 m' Rp 113,305.00
- Kaca bening t = 5 mm 9.21 m² Rp 296,262.50

Page 331 of 368


NO. URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN

6 Jendela type J7
- Kusen alumunium 39.40 m' Rp 113,305.00
- Kaca bening t = 5 mm 9.60 m² Rp 277,012.50

Page 332 of 368


NO. URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN

7 Jendela type BV
- Kusen alumunium 4.40 m' Rp 113,305.00
- Kaca buram t = 5 mm 0.40 m² Rp 296,262.50

E PEKERJAAAN PELAFOND SUB. TOTAL :

1 Plafond gypsum board t = 9 mm + metal frame 140.37 m² Rp 150,672.00


2 List tepi plafond profil gypsum 121.35 m' Rp 12,977.50

F PEKERJAAN RAILLING DAN ACP SUB. TOTAL :

1 Railling balkon 3.85 m' Rp 633,450.00

G PEKERJAAN CAT SUB. TOTAL :

1 Pengecatan dinding luar (exterior) 300.16 m² Rp 21,897.00


2 Pengecatan dinding dalam (interior) 375.99 m² Rp 21,897.00
3 Pengecatan plafond 140.37 m² Rp 20,539.50
4 Pengecatan listplang 18.33 m² Rp 113,145.00

- ATAP TOTAL ATP. :

1 Pasangan genteng 229.41 m² Rp 115,310.00


2 Pasangan bubungan 39.65 m² Rp 119,870.00
3 Pasangan tempered glass atap gazebo 22.56 m² Rp 397,100.00
4 Pasangan listplang 61.10 m' Rp 114,137.50

V. PEKERJAAN MEP

- LANTAI 1 TOTAL LT. 1 :

A PEKERJAAN MEKANIKAL ELEKTRIKAL SUB. TOTAL :

1 Down Light E27 Ess 8 Watt 11.00 titik Rp 261,175.00


2 Down Light E27 Ess 18 Watt 11.00 titik Rp 285,175.00
3 TL Balk 1 x 36 Watt 7.00 titik Rp 343,175.00
4 Baret E27 Ess 18 Watt 2.00 titik Rp 393,675.00
5 Ceiling Exhaust Fan 3.00 buah Rp 366,175.00
6 Saklar Ganda 6.00 buah Rp 255,675.00
7 Saklar Tunggal 9.00 buah Rp 236,925.00
8 Saklar Tukar/Hotel 1.00 buah Rp 243,175.00

Page 333 of 368


NO. URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN

9 Stop kontak 16A.200W.1PH 11.00 buah Rp 241,675.00


10 Stop kontak 16A.200W.2PH 1.00 buah Rp 263,675.00
11 MCB 1.00 unit Rp 427,945.00
12 Kabel NYM 2 x 2.5 155.00 m' Rp 83,795.00
13 Indoor Unit Ac, Wall Mounted Type 3.00 buah Rp 3,876,175.00

Page 334 of 368


NO. URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN

B PEKERJAAN SANITASI SUB. TOTAL :

1 Floor drain 3.00 buah Rp 42,475.00


2 Closet duduk 3.00 buah Rp 1,971,585.00
3 Wastafel 1.00 buah Rp 1,047,260.00
4 Kran air 6.00 buah Rp 77,550.00
5 Bak air UVC 3.00 buah Rp 377,015.20
6 Tandon air kapasitas 300 liter 1.00 buah Rp 687,500.00
7 Kitchen sink 1.00 buah Rp 229,507.50
8 Pipa air Ø 1/2'' 57.76 m' Rp 30,278.75
9 Pipa air Ø 3'' 35.00 m' Rp 73,199.38
10 Pipa air Ø 4" 41.30 m' Rp 85,823.75
11 Cermin 0.96 m² Rp 293,003.75
12 Sumur resapan 2.00 buah Rp 1,412,500.00
13 Septictannk Biofilter 1.00 buah Rp 2,450,000.00

- LANTAI 2 TOTAL LT. 2 :

A PEKERJAAN MEKANIKAL ELEKTRIKAL SUB. TOTAL :

1 Down Light E27 Ess 8 Watt 19.00 titik Rp 261,175.00


2 Down Light E27 Ess 18 Watt 19.00 titik Rp 285,175.00
3 TL Balk 1 x 36 Watt 1.00 titik Rp 343,175.00
4 Ceiling Exhaust Fan 3.00 buah Rp 366,175.00
5 Saklar Ganda 4.00 buah Rp 255,675.00
6 Saklar Tunggal 9.00 buah Rp 236,925.00
7 Saklar Tukar/Hotel 1.00 buah Rp 243,175.00
8 Stop kontak 16A.200W.1PH 9.00 buah Rp 241,675.00
9 Stop kontak 16A.200W.2PH 1.00 buah Rp 263,675.00
10 MCB 1.00 unit Rp 427,945.00
11 Kabel NYM 2 x 2.5 155.00 m' Rp 83,795.00
12 Indoor Unit Ac, Wall Mounted Type 5.00 buah Rp 3,876,175.00

B PEKERJAAN SANITASI SUB. TOTAL :

1 Floor drain 3.00 buah Rp 42,475.00


2 Closet duduk 3.00 buah Rp 1,971,585.00
3 Wastafel 1.00 buah Rp 1,047,260.00
4 Kran air 3.00 buah Rp 77,550.00
5 Bathtub 1.00 buah Rp 2,637,940.00
6 Bak air UVC 2.00 buah Rp 377,015.20
7 Pipa air Ø 1/2'' 33.00 m' Rp 30,278.75

Page 335 of 368


NO. URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN

8 Pipa air Ø 3'' 23.60 m' Rp 73,199.38


9 Pipa air Ø 4" 51.10 m' Rp 85,823.75
10 Cermin 0.96 m² Rp 293,003.75

Page 336 of 368


NO. URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN

- LANTAI 3 TOTAL LT. 3 :

A PEKERJAAN MEKANIKAL ELEKTRIKAL SUB. TOTAL :

1 Down Light E27 Ess 8 Watt 8.00 titik Rp 261,175.00


2 Down Light E27 Ess 18 Watt 8.00 titik Rp 285,175.00
3 TL Balk 1 x 36 Watt 1.00 titik Rp 343,175.00
4 Ceiling Exhaust Fan 2.00 buah Rp 366,175.00
5 Saklar Ganda 3.00 buah Rp 255,675.00
6 Saklar Tunggal 6.00 buah Rp 236,925.00
7 Saklar Tukar/Hotel 1.00 buah Rp 243,175.00
8 Stop kontak 16A.200W.1PH 7.00 buah Rp 241,675.00
9 MCB 1.00 buah Rp 427,945.00
10 Kabel NYM 2 x 2.5 130.00 m' Rp 83,795.00
11 Indoor Unit Ac, Wall Mounted Type 3.00 buah Rp 3,876,175.00

B PEKERJAAN SANITASI SUB. TOTAL :

1 Floor drain 2.00 buah Rp 42,475.00


2 Closet duduk 2.00 buah Rp 1,971,585.00
3 Kran air 2.00 buah Rp 77,550.00
4 Bak air UVC 2.00 buah Rp 377,015.20
5 Pipa air Ø 1/2'' 26.35 m' Rp 30,278.75
6 Pipa air Ø 3'' 18.45 m' Rp 73,199.38
7 Pipa air Ø 4" 38.30 m' Rp 85,823.75
8 Cermin 0.64 m² Rp 293,003.75

Page 337 of 368


TOTAL

Rp 85,890,904.50

Rp 8,334,250.00
Rp 15,565,872.00
Rp 41,217,700.00
Rp 2,500,000.00
Rp 4,000,000.00
Rp 8,999,595.00
Rp 273,487.50
Rp 5,000,000.00

Rp132,655,345.98

Rp 17,861,144.11
Rp 7,545,021.41
Rp 77,063,438.74
Rp 11,006,563.03
Rp 9,352,812.44
Rp 9,826,366.24

Rp 194,348,119.78

Rp 7,188,204.13

Rp 465,528.05
Rp 1,669,304.95
Rp 700,855.87

Rp 2,814,432.90
Rp 2,584,826.51
Rp 1,325,844.00

Rp 13,342,496.70

Page 338 of 368


TOTAL

Rp 8,730,969.54
Rp 4,714,112.00

Rp 7,505,154.40
Rp 3,245,503.08
Rp 3,535,584.00

Page 339 of 368


TOTAL

Rp 7,256,396.55
Rp 19,664,703.70
Rp 20,159,727.00

Rp 1,287,185.53
Rp 8,573,273.23
Rp 9,575,870.33

Rp 7,228,088.32
Rp 20,574,786.54
Rp 14,291,816.96

Rp 4,326,589.85
Rp 12,410,533.80
Rp 11,176,331.85

Rp174,710,213.78

Rp 8,734,803.90
Rp 23,233,219.25
Rp 24,330,705.00

Rp 1,570,107.36
Rp 6,972,750.20
Rp 11,557,084.88

Rp 2,444,976.23
Rp 10,929,414.22
Rp 17,987,342.63

Rp 1,512,611.23
Rp 2,960,750.09
Rp 4,087,824.57

Rp 1,098,122.50
Rp 2,965,140.14
Rp 4,086,871.71

Page 340 of 368


TOTAL

Rp 4,950,118.40
Rp 9,897,978.08
Rp 6,660,658.11

Page 341 of 368


TOTAL

Rp 2,755,057.43
Rp 17,123,988.93
Rp 8,850,688.93

Rp483,565,743.46

Rp 9,966,810.01
Rp 26,151,293.77
Rp 27,806,520.00

Rp 1,974,366.46
Rp 8,677,373.50
Rp 14,598,423.00

Rp 4,473,255.76
Rp 10,374,549.40
Rp 13,092,206.48

Rp 12,307,949.42
Rp 28,641,992.89
Rp 36,721,043.38

Rp 2,497,154.65
Rp 7,391,415.93
Rp 9,697,930.73

Rp 5,325,376.12
Rp 9,938,073.76
Rp 6,660,658.11

Rp 27,933,464.06
Rp 144,598,724.36
Rp 74,737,161.69

Rp 351,115,779.88

Rp 8,726,172.78
Rp 23,431,191.68
Rp 24,330,705.00

Page 342 of 368


TOTAL

Rp 1,151,775.03
Rp 4,998,260.69
Rp 8,515,746.75

Page 343 of 368


TOTAL

Rp 4,473,255.76
Rp 10,374,549.40
Rp 13,092,206.48

Rp 7,676,690.62
Rp 17,912,388.81
Rp 22,904,099.06

Rp 2,497,154.65
Rp 7,391,415.93
Rp 9,697,930.73

Rp 1,435,813.14
Rp 3,822,900.37
Rp 5,452,292.85

Rp 161,002.99
Rp 480,832.60
Rp 842,423.94

Rp 17,813,576.42
Rp 92,216,055.35
Rp 47,662,704.28

Rp 1,346,954.96
Rp 8,377,627.10
Rp 4,330,052.52

Rp 30,545,291.76

Rp 2,523,011.99
Rp 9,231,510.65
Rp 10,344,459.44

Rp 900,774.44
Rp 2,878,312.97
Rp 4,667,222.27

Rp185,964,357.24

Page 344 of 368


TOTAL

Rp 10,689,208.43
Rp 19,929,154.21
Rp 307,400.22

Page 345 of 368


TOTAL

Rp 5,046,076.77
Rp 12,565,583.80
Rp 102,466.74

Rp 9,655,597.28
Rp 17,024,771.09
Rp 274,729.66
Rp 106,674,232.14
Rp 3,695,136.92

Rp713,486,172.97

Rp231,533,825.08

Rp 71,369,766.20
Rp 19,057,411.74
Rp 10,898,991.80
Rp 81,110,742.09
Rp 2,951,294.40
Rp 6,222,964.50
Rp 21,857,867.22
Rp 18,064,787.13

Rp134,084,147.98

Rp 87,316,678.68
Rp 3,151,578.24
Rp 42,576,352.81
Rp 1,039,538.25

Rp100,224,919.63

Rp 69,486,183.75
Rp 8,077,576.83
Rp 1,205,719.24
Rp 6,569,522.63
Rp 14,885,917.20

Page 346 of 368


TOTAL

Rp 43,351,850.13

Rp 2,045,155.25
Rp 1,414,565.78
Rp 1,852,407.56
Rp 1,778,420.25
Rp 341,075.00
Rp 153,712.50
Rp 157,275.00
Rp 222,475.00

Rp 2,288,761.00
Rp 725,694.70
Rp 1,167,578.10
Rp 1,847,673.38
Rp 194,900.00
Rp 102,475.00
Rp 78,637.50
Rp 222,475.00

Rp 1,767,558.00
Rp 7,920,423.00
Rp 235,912.50
Rp 667,425.00

Rp 1,065,000.00

Rp 1,370,990.50
Rp 1,961,531.21
Rp 1,017,189.90
Rp 194,900.00
Rp 102,475.00

Rp 1,031,075.50
Rp 619,714.53
Rp 701,395.65
Rp 97,450.00

Page 347 of 368


TOTAL

Rp 51,237.50

Page 348 of 368


TOTAL

Rp 1,790,219.00
Rp 3,031,212.38
Rp 1,608,057.56
Rp 292,350.00
Rp 153,712.50

Rp 702,491.00
Rp 853,230.15
Rp 448,760.25
Rp 97,450.00
Rp 51,237.50

Rp 747,813.00
Rp 177,757.50

Rp 29,655,183.42

Rp 27,733,215.67
Rp 1,921,967.75

Rp 145,825,114.50

Rp 16,130,682.00
Rp 5,130,945.00
Rp 5,827,740.00
Rp 118,735,747.50

Rp 28,811,132.22

Rp 13,302,419.47
Rp 9,470,897.74
Rp 3,780,572.26
Rp 2,257,242.75

Rp434,842,733.46

Rp 54,521,938.79

Rp 39,868,753.89

Page 349 of 368


TOTAL

Rp 3,771,098.40
Rp 8,429,689.50
Rp 2,452,397.00

Page 350 of 368


TOTAL

Rp 71,785,525.26

Rp 42,919,187.81
Rp 4,027,016.64
Rp 23,562,445.07
Rp 1,276,875.75

Rp 56,465,611.77

Rp 38,184,809.50
Rp 2,242,737.02
Rp 16,038,065.25

Rp 49,813,448.92

Rp 3,138,548.50
Rp 754,435.08
Rp 5,281,045.56
Rp 3,152,845.47
Rp 682,150.00
Rp 461,137.50
Rp 78,637.50
Rp 222,475.00

Rp 2,753,311.50
Rp 754,435.08
Rp 1,841,180.85
Rp 2,240,089.28
Rp 292,350.00
Rp 204,950.00
Rp 78,637.50
Rp 222,475.00

Rp 2,945,930.00
Rp 13,200,705.00
Rp 393,187.50
Rp 1,112,375.00

Rp 1,065,000.00

Page 351 of 368


TOTAL

Page 352 of 368


TOTAL

Rp 2,334,083.00
Rp 3,412,920.60
Rp 1,795,041.00
Rp 194,900.00
Rp 102,475.00

Rp 498,542.00
Rp 118,505.00

Rp 362,576.00
Rp 118,505.00

Rp 19,094,751.04

Rp 17,389,507.54
Rp 1,705,243.50

Rp152,073,507.00

Rp 16,130,682.00
Rp 6,081,120.00
Rp 129,861,705.00

Rp 31,087,950.67

Rp 8,698,437.27
Rp 8,233,126.02
Rp 2,370,525.31
Rp 11,785,862.07

Rp235,015,653.37

Rp 40,164,623.32

Rp 30,385,442.12
Rp 2,295,451.20
Rp 5,031,333.00
Rp 2,452,397.00

Page 353 of 368


TOTAL

Rp 53,337,034.12

Rp 32,710,289.88
Rp 2,451,227.52
Rp 17,387,556.22
Rp 787,960.50

Rp 39,113,757.77

Rp 37,829,752.24
Rp 1,284,005.54

Rp 57,474,807.34

Rp 2,753,311.50
Rp 754,435.08
Rp 1,841,180.85
Rp 2,240,089.28
Rp 292,350.00
Rp 204,950.00
Rp 78,637.50
Rp 222,475.00

Rp 2,356,744.00
Rp 10,560,564.00
Rp 314,550.00
Rp 889,900.00

Rp 710,000.00

Rp 5,835,207.50
Rp 8,532,301.50
Rp 4,487,602.50
Rp 974,500.00
Rp 512,375.00

Rp 3,444,472.00
Rp 2,728,577.63

Page 354 of 368


TOTAL

Rp 4,464,217.00
Rp 2,659,320.00

Page 355 of 368


TOTAL

Rp 498,542.00
Rp 118,505.00

Rp 22,723,970.24

Rp 21,149,150.62
Rp 1,574,819.63

Rp 2,438,782.50

Rp 2,438,782.50

Rp 19,762,678.08

Rp 6,572,567.03
Rp 8,233,126.02
Rp 2,883,037.19
Rp 2,073,947.85

Rp 47,139,690.16

Rp 26,453,474.66
Rp 4,752,845.50
Rp 8,959,568.75
Rp 6,973,801.25

Rp 65,188,771.30

Rp 42,174,295.00

Rp 2,872,925.00
Rp 3,136,925.00
Rp 2,402,225.00
Rp 787,350.00
Rp 1,098,525.00
Rp 1,534,050.00
Rp 2,132,325.00
Rp 243,175.00

Page 356 of 368


TOTAL

Rp 2,658,425.00
Rp 263,675.00
Rp 427,945.00
Rp 12,988,225.00
Rp 11,628,525.00

Page 357 of 368


TOTAL

Rp 23,014,476.30

Rp 127,425.00
Rp 5,914,755.00
Rp 1,047,260.00
Rp 465,300.00
Rp 1,131,045.60
Rp 687,500.00
Rp 229,507.50
Rp 1,748,900.60
Rp 2,561,978.13
Rp 3,544,520.88
Rp 281,283.60
Rp 2,825,000.00
Rp 2,450,000.00

Rp 68,563,986.63

Rp 50,456,345.00

Rp 4,962,325.00
Rp 5,418,325.00
Rp 343,175.00
Rp 1,098,525.00
Rp 1,022,700.00
Rp 2,132,325.00
Rp 243,175.00
Rp 2,175,075.00
Rp 263,675.00
Rp 427,945.00
Rp 12,988,225.00
Rp 19,380,875.00

Rp 18,107,641.63

Rp 127,425.00
Rp 5,914,755.00
Rp 1,047,260.00
Rp 232,650.00
Rp 2,637,940.00
Rp 754,030.40
Rp 999,198.75

Page 358 of 368


TOTAL

Rp 1,727,505.25
Rp 4,385,593.63
Rp 281,283.60

Page 359 of 368


TOTAL

Rp 43,079,815.96

Rp 32,519,620.00

Rp 2,089,400.00
Rp 2,281,400.00
Rp 343,175.00
Rp 732,350.00
Rp 767,025.00
Rp 1,421,550.00
Rp 243,175.00
Rp 1,691,725.00
Rp 427,945.00
Rp 10,893,350.00
Rp 11,628,525.00

Rp 10,560,195.96

Rp 84,950.00
Rp 3,943,170.00
Rp 155,100.00
Rp 754,030.40
Rp 797,845.06
Rp 1,350,528.47
Rp 3,287,049.63
Rp 187,522.40

Page 360 of 368


F. REKAPITULASI

PEKERJAAN : PEMBANGUNAN RUMAH 3 LANTAI


LOKASI : JL. WOLTER MONGINSIDI, NO. 23, SEMARANG

NO URAIAN PEKERJAAN

I. PEKERJAAN PERSIAPAN

II. PEKERJAAN TANAH

III. PEKERJAAN STRUKTUR

A SUB STRUKTUR

B PEKERJAAN STRUKTUR ATAS

- LANTAI 1

- LANTAI 2

- LANTAI 3

- RING BALK

- ATAP

IV. PEKERJAAN ARSITEKTUR

- LANTAI 1

- LANTAI 2

- LANTAI 3

- ATAP

V. PEKERJAAN MEP

- LANTAI 1

- LANTAI 2

- LANTAI 3

Page 361 of 368


JUMLAH BIAYA :
PPN 10 % :
TOTAL :
DIBULATKAN :
Terbilang : TIGA MILYAR LIMA RATUS TUJUH PULUH JUTA TUJUH RATUS DUA PULUH E

Page 362 of 368


JUMLAH BIAYA
KETERANGAN
( Rp )

Rp 85,890,904.50

Rp 132,655,345.98

Rp 194,348,119.78

Rp 174,710,213.78

Rp 483,565,743.46

Rp 351,115,779.88

Rp 30,545,291.76

Rp 185,964,357.24

Rp 713,486,172.97

Rp 434,842,733.46

Rp 235,015,653.37

Rp 47,139,690.16

Rp 65,188,771.30

Rp 68,563,986.63

Rp 43,079,815.96

Page 363 of 368


Rp 3,246,112,580.22
Rp 324,611,258.02
Rp 3,570,723,838.24
Rp 3,570,724,000.00
TUJUH PULUH JUTA TUJUH RATUS DUA PULUH EMPAT RIBU RUPIAH

Page 364 of 368


2. JADWAL WAKTU PELAKSANAAN (BARTCHAT DAN KURVA S)

JADWAL PELAKSANAAN PEKERJAAN

PEKERJAAN : PEMBANGUNAN RUMAH 3 LANTAI


LOKASI : JL. WOLTER MONGINSIDI, NO. 23, SEMARANG
JUMLAH BIAYA BOBOT MINGGU
NO URAIAN PEKERJAAN
( Rp ) (%) 1 2 3 4 5 6 7 8 9 10 11 12 13

I. PEKERJAAN PERSIAPAN Rp 85,890,904.50 2.646 1.323 1.323

II. PEKERJAAN TANAH Rp 132,655,345.98 4.087 0.817 0.817 0.817 0.817 0.817

III. PEKERJAAN STRUKTUR

A SUB STRUKTUR Rp 194,348,119.78 5.987 1.497 1.497 1.497 1.497

B PEKERJAAN STRUKTUR ATAS

- LANTAI 1 Rp 174,710,213.78 5.382 1.346 1.346 1.346 1.346

- LANTAI 2 Rp 483,565,743.46 14.897 2.979 2.979 2.979 2.979 2.979

- LANTAI 3 Rp 351,115,779.88 10.817 2.704

- RING BALK Rp 30,545,291.76 0.941

- ATAP Rp 185,964,357.24 5.729

IV. PEKERJAAN ARSITEKTUR

- LANTAI 1 Rp 713,486,172.97 21.980 2.747 2.747 2.747 2.747 2.747 2.747

- LANTAI 2 Rp 434,842,733.46 13.396 2.233 2.233

- LANTAI 3 Rp 235,015,653.37 7.240

- ATAP Rp 47,139,690.16 1.452

V. PEKERJAAN MEP

Page 365 of 368


- LANTAI 1 Rp 65,188,771.30 2.008 1.004 1.004

- LANTAI 2 Rp 68,563,986.63 2.112 1.0561

- LANTAI 3 Rp 43,079,815.96 1.327

JUMLAH Rp 3,246,112,580.22 100%

JUMLAH (RENCANA) : 1.323 1.323 0.817 2.314 5.062 5.590 5.590 4.910 6.146 5.727 6.731 6.268 7.916

JUMLAH KOMULATIF (RENCANA) : 1.323 2.646 3.463 5.777 10.839 16.429 22.018 26.929 33.075 38.802 45.533 51.801 59.717

Page 366 of 368


KETERANGAN

14 15 16 17 18 19 20 (%)
100%

90%

80%

70%

60%

2.704 2.704 2.704

0.941
50%
2.864 2.864

40%
2.747 2.747

2.233 2.233 2.233 2.233


30%
1.448 1.448 1.448 1.448 1.448

0.726 0.726
20%

Page 367 of 368


10%
1.056

0.664 0.664
0%

3.760 5.600 7.326 6.545 4.976 4.922 7.154

63.477 69.078 76.403 82.948 87.924 92.846 100.000

Page 368 of 368