Anda di halaman 1dari 51

REKAPITULASI TOTAL RENCANA ANGGARAN BIAYA (RAB)

PEKERJAAN PEMBANGUNAN RUMAH PAK AGUS

JML TOTAL
NO URAIAN PEKERJAAN
(Rp)

1 PEKERJAAN FISIK BANGUNAN Rp 692,799,261.41

2 MEKANIKAL ELEKTRIKAL Rp 7,885,000.00

JUMLAH : Rp 700,684,261.41
Dibulatkan : Rp -

Purwokerto, 22 Februari 2015


RENCANA ANGGARAN BIAYA (RAB)
PEKERJAAN MEKANIKAL ELEKTRIKAL RUMAH PAK AGUS

NO URAIAN PEKERJAAN HARGA JML HARGA JML TOTAL


VOLUME SAT SATUAN ( Rp ) ( Rp )

PEKERJAAN LISTRIK (pakai Listrik Lama)


1 MCB 1 LS Rp 500,000.00 Rp 500,000.00
2 TTK LAMPU 26 MT Rp 30,000.00 Rp 780,000.00
3 STOP KONTAK 15 TTK Rp 20,000.00 Rp 300,000.00
4 STAKER 25 TTK Rp 17,000.00 Rp 425,000.00
5 PEKERJAAN INSTALASI LAMPU & STOP KON 42 TTK Rp 140,000.00 Rp 5,880,000.00
Rp 7,885,000.00 Rp 7,885,000.00

JUMLAH Rp 7,885,000.00

Dibulatkan
RENCANA ANGGARAN BIAYA PELAKSANAAN (RAP)
PEKERJAAN PEMBANGUNAN RUMAH PAK AGUS

JML HARGA BOBOT


NO URAIAN PEKERJAAN VOLUME SAT (%) 1 2 3 4
(Rp)

I PEKERJAAN PERSIAPAN
1 Membersihkan Lapangan dan Perataan 237.000 m2 Rp 1,777,500.00 0.2566 0.2566
2 Pengukuran dan Pasangan Bouplang 66.000 m1 Rp 2,729,100.00 0.3939 0.3939
II PEKERJAAN TANAH DAN PASIR
1 Galian tnh Pondasi Batu Kali 77.400 m3 Rp 2,658,690.00 0.3838 0.1919 0.1919
2 Galian Tanah footplate 7.000 m3 Rp 240,450.00 0.0347 0.0347
3 Urug tanah kembali 21.100 m3 Rp 222,605.00 0.0321
4 Urug pasir bwh lantai 11.850 m3 Rp 1,921,675.00 0.2774
5 Urug peninggian level bangunan 50 cm 118.500 m3 Rp 12,294,375.00 1.7746
III PEKERJAAN PASANGAN
1 Pas Pondasi bt kali 1:3:10 77.400 m3 Rp 39,978,562.00 5.7706 1.9235 1.9235
2 Pas Rollag Bata 1:3:10 20.000 m' Rp 167,680.80 0.0242
3 Rabat beton 11.850 m3 Rp 7,153,792.33 1.0326
4 Pas Dinding 1/2 bata 1:3:10 671.920 m2 Rp 56,334,041.57 8.1314
5 Pek Plesteran dan Acian dinding 1,343.840 m2 Rp 59,836,865.05 8.6370
6 Pas Bak Kontrol Saluran 4.000 unit Rp 1,255,235.56 0.1812
7 Pas Lis Beton
Lis beton keliling lebar 30 cm 48.000 m1 Rp 7,200,000.00 1.0393
Lis beton ujung topi2 beton 45.000 m1 Rp 2,700,000.00 0.3897
Lis beton keliling jendela (6 jendela) 36.000 m1 Rp 1,800,000.00 0.2598
Teras Depan, Teras samping
* Mahkota 2.000 bh Rp 200,000.00 0.0289
* Lis beton lebar 12 cm 60.000 m1 Rp 3,000,000.00 0.4330
IV PEKERJAAN BETON
1 Pek Footplat 2.450 m3 Rp 2,001,846.00 0.2890 0.2890
- Pembesian 490.000 kg Rp 7,775,810.00 1.1224 1.1224

2 Pek Sloof Beton15/25. 1:2:3 6.450 m3 Rp 5,270,166.00 0.7607


- Pembesian 1,128.750 kg Rp 17,912,133.75 2.5855
- Begisting Sloof 86.000 m2 Rp 9,242,420.00 1.3341

3 Pek Kolom Beton K.20/20 1:2:3 3.920 m3 Rp 3,202,953.60 0.4623 0.1156


- Pembesian 686.000 kg Rp 10,886,134.00 1.5713 0.3928
- Begisting 67.200 m2 Rp 9,096,696.00 1.3130 0.3283

4 Pek Kolom Beton Praktis 15/15 1:2:3 3.870 m3 Rp 3,162,099.60 0.4564


- Pembesian 677.250 kg Rp 10,747,280.25 1.5513
- Begisting 51.600 m2 Rp 6,984,963.00 1.0082

5 Pek Balok Lateu atas kusen 10/15 0.795 m3 Rp 649,578.60 0.0938


- Pembesian 159.000 kg Rp 2,523,171.00 0.3642
- Begisting 15.900 m2 Rp 2,247,226.50 0.3244
6 Pek Balok Beton 15/30 1.238 m3 Rp 1,011,136.50 0.1459
- Pembesian 247.500 kg Rp 3,927,577.50 0.5669
- Begisting 20.625 m2 Rp 2,915,034.38 0.4208
7 Pek Ring Balok Beton 15/20 5.160 m3 Rp 4,216,132.80 0.6086
- Pembesian 1,032.000 kg Rp 16,376,808.00 2.3639
- Begisting 137.600 m2 Rp 19,447,696.00 2.8071

8 Pek Plat Dak tebal 12 cm 3.672 m3 Rp 3,000,317.76 0.4331


- Pembesian 734.400 kg Rp 11,654,193.60 1.6822
- Begisting 20.625 m2 Rp 2,915,034.38 0.4208

9 Pek Plat Topi2 tebal 8 cm 1.050 m3 Rp 857,934.00 0.1238


- Pembesian 210.000 kg Rp 3,332,490.00 0.4810
- Begisting 15.000 m2 Rp 2,120,025.00 0.3060

IV PEKERJAAN KERAMIK
1 Pas Lantai Granit Teras 16.00 m2 Rp 3,684,064.00 0.5318
2 Pas Lantai Granit Cina 60x60 145.340 m2 Rp 33,465,116.36 4.8304

3 Pas Lantai Keramik 40x40 75.715 m2 Rp 9,862,181.61 1.4235


Garasi 40x40 pas diagonal 26.465 m2
Gudang 7.600 m2
Kamar Pembantu 7.000 m2
Dapur 14.100 m2
Tempat cuci jemur 7.200 m2
Kamar Mandi 13.350 m2

4 Pas dinding keramik KM 20x40 74.550 m2 Rp 9,710,435.70 1.4016

5 Pas Plesteran Carport 30.100 m2 Rp 1,340,256.01 0.1935

VI PEKERJAAN KUSEN PINTU DAN JENDELA


1 Pintu Utama P1 depan 1.000 unit
Kusen 16.20 m1 Rp 1,539,000.00 0.2221
Daun Pintu Kayu Bangkir 2.000 bh Rp 1,800,000.00 0.2598
Pas Spanolet 1.000 unit Rp 150,000.00 0.0217
Kunci Pelor 1.000 bh Rp 150,000.00 0.0217
Pas Handel Pintu Utama 2.000 psg Rp 400,000.00 0.0577
Engsel 4" pintu isi 4 4.000 psg Rp 60,000.00 0.0087
Pas Kaca 5 mm 1.700 m2 Rp 144,500.00 0.0209

Jendela Depan kanan kiri 2.000 unit


Kusen 11.400 m1 Rp 1,083,000.00 0.1563
Pas Daun Jendela Besar 2.000 unit Rp 900,000.00 0.1299
Pas Daun Jendela Kecil 2.000 unit Rp 500,000.00 0.0722
Engsel 3" 5.000 psg Rp 75,000.00 0.0108
Pas Kait Angin 4.000 psg Rp 100,000.00 0.0144
Kunci Jago 4.000 bh Rp 80,000.00 0.0115

Jendela Teras Depan dan samping Atas 4.000 unit


Kusen aluminium 4" putih 12.000 m1 Rp 1,140,000.00 0.1645
Kusen certainwall 8.000 m1 Rp 760,000.00 0.1097
Pas Kaca Oneway 2.000 m2 Rp 1,800,000.00 0.2598

2 Pintu Utama P1' samping 1.000 unit


Kusen 5.20 m1 Rp 494,000.00 0.0713
Daun Pintu Kayu Bangkir 2.000 bh Rp 1,800,000.00 0.2598
Pas Spanolet 1.000 unit Rp 150,000.00 0.0217
Kunci Pelor 1.000 bh Rp 150,000.00 0.0217
Pas Handel Pintu Utama 2.000 psg Rp 400,000.00 0.0577
Engsel 4" pintu isi 4 4.000 psg Rp 60,000.00 0.0087
Pas Kaca 5 mm 1.700 m2 Rp 144,500.00 0.0209
Pas Jendela kecil atas 2.000 unit Rp 500,000.00 0.0722

Jendela Samping kanan kiri 2.000 unit


Kusen 18.600 m1 Rp 1,767,000.00 0.2551
Pas Daun Jendela Besar 2.000 unit Rp 900,000.00 0.1299
Pas Daun Jendela Kecil 2.000 unit Rp 500,000.00 0.0722
Engsel 3" 5.000 psg Rp 75,000.00 0.0108
Pas Kait Angin 4.000 psg Rp 100,000.00 0.0144
Kunci Jago 4.000 bh Rp 80,000.00 0.0115

3 Pintu P2 kamar 6.000 unit


Kusen 43.20 m1 Rp 4,104,000.00 0.5924
Daun Pintu Kayu Bangkir 6.000 bh Rp 5,400,000.00 0.7794
Pas Slot 6.000 unit Rp 900,000.00 0.1299
Engsel 4" pintu isi 4 12.000 psg Rp 180,000.00 0.0260
Pas Jendela atas pintu 6.000 unit Rp 1,500,000.00 0.2165
Engsel jendela 3" 6.000 psg Rp 90,000.00 0.0130
Tangan gareng 6.000 psg Rp 150,000.00 0.0217
Kunci Jago 6.000 bh Rp 120,000.00 0.0173

2 Pintu P3 kamar mandi 3.000 unit


Kusen 9.00 m1 Rp 855,000.00 0.1234
Daun Pintu Aluminium 3.000 bh Rp 2,400,000.00 0.3464
Pas Kaca Es 6.000 m2 Rp 1,200,000.00 0.1732

3 Pintu Tralis kebelakang 1.000 unit Rp 800,000.00 0.1155

4 Jendela J1 kamar 5.000 unit


Kusen 55.500 m1 Rp 5,272,500.00 0.7610
Pas daun jendela 10.000 unit Rp 4,500,000.00 0.6495
Pas Daun jendela kecil atas 10.000 unit Rp 2,500,000.00 0.3609
Pas Kaca 5 mm 11.700 m2 Rp 994,500.00 0.1435
Engsel jendela kupu - kupu 20.000 bh Rp 300,000.00 0.0433
Pas Kait Angin 10.000 bh Rp 150,000.00 0.0217
Pas Kunci Jago 10.000 bh Rp 200,000.00 0.0289

6 Jendela J2 Sudut 1.000 unit


Kusen aluminium warna putih 10.00 m1 Rp 950,000.00 0.1371
Pas daun jendela 3.000 unit Rp 1,350,000.00 0.1949
Pas Kaca 5 mm 4.000 m2 Rp 340,000.00 0.0491
Engsel jendela kupu - kupu 3.000 psg Rp 45,000.00 0.0065
Pas Kait Angin 3.000 bh Rp 45,000.00 0.0065
Pas Kunci Jago 3.000 bh Rp 60,000.00 0.0087

7 Pintu Jendela kamar pembantu tanpa jendela atas 1.000 unit


Kusen 7.90 m1 Rp 750,500.00 0.1083
Pas daun Pintu 1.00 unit Rp 900,000.00 0.1299
Slot 1.00 unit Rp 150,000.00 0.0217
Engsel 4" 2.00 psg Rp 30,000.00 0.0043
Pas daun jendela 1.000 unit Rp 450,000.00 0.0650
Engsel 3" 1.000 psg Rp 15,000.00 0.0022
Kait Angin 1.000 psg Rp 25,000.00 0.0036
Kunci Jago 1.000 bh Rp 20,000.00 0.0029
Pas Kaca 8 mm 0.500 m2 Rp 150,000.00 0.0217

8 Boven kamar mandi 3.000 bh


Kusen 6.000 m1 Rp 570,000.00 0.0823
Daun Jendela 3.000 unit Rp 750,000.00 0.1083
Pas engsel 3.000 psg Rp 45,000.00 0.0065
Pas Tangan gareng 3.000 psg Rp 60,000.00 0.0087
Kunci Jago 3.000 bh Rp 60,000.00 0.0087

9 Pas Lis kaca riben atas keramik 8 cm 270.000 m1 Rp 5,400,000.00 0.7794

10 Pintu Garasi 6 daun


Daun Pintu 6.000 daun Rp 5,400,000.00 0.7794
Pemasangan engsel dan rel 1.000 ls Rp 4,500,000.00 0.6495

VII PEKERJAAN PLAFOND DAN PARTISI


1 Pas Plafond Kalsiboard Rangka Kayu 294.000 m2 Rp 17,640,000.00 2.5462
2 Coumpond 294.000 m2 Rp 5,880,000.00 0.8487
3 Pas Dome kecil Teras depan 1.000 unit Rp 1,000,000.00 0.1443
4 Pas Dome Ruang Tamu 1.000 unit Rp 1,500,000.00 0.2165
5 Pas Lis gipsum 12 cm 172.000 m1 Rp 2,064,000.00 0.2979
6 Pas Lis Gipsum 15 cm 90.000 m1 Rp 1,350,000.00 0.1949
7 Pas Biding 6 cm 80.000 m1 Rp 560,000.00 0.0808

IX PEKERJAAN INSTALASI AIR


A PEKERJAAN INSTALASI AIR BERSIH
1 Pas Pompa dr sumur ke Torn 1.000 unit Rp 500,000.00 0.0722 0.0722
sumur lama dipakai
2 Err:508 35.000 m1 Rp 369,250.00 0.0533
3 Pas Pipa PVC diameter 1" tipe AW 15.000 m1 Rp 209,400.00 0.0302
dari sumur-torn
4 Pas Kran Air 3.000 bh Rp 225,000.00 0.0325
8 Pas Kran Dobel Shower 3.000 unit Rp 750,000.00 0.1083
9 Pas jet shower tiap kamar mandi 3.000 bh Rp 225,000.00 0.0325
10 Pas Batub 1.000 unit Rp 3,000,000.00 0.4330
11 Pas Bak Wastafel bikin 1.000 unit Rp 2,000,000.00 0.2887
12 Pas Kaca Cermin 2.000 m2 Rp 400,000.00 0.0577
13 Pas Stop kran 3.00 unit Rp 225,000.00 0.0325

B PEKERJAAN INSTALASI AIR KOTOR


1 Err:508 15.000 m1 Rp 1,255,875.00 0.1813
2 Pasang Pipa PVC diam. 3" type AW 15.000 m2 Rp 767,475.00 0.1108
3 Pas Pipa PVC diam 2" depan garasi 14.000 m1 Rp 412,510.00 0.0595
Buangan air hujan dari atas
4 Pas Kloset Jongkok 2.000 bh Rp 688,804.44 0.0994
Pas Kloset Duduk 1.000 bh Rp 1,516,570.00 0.2189
5 Pas Floor Drain Stainless 3.000 bh Rp 80,850.00 0.0117
6 Pas Tempat sabun 3.000 bh Rp 225,000.00 0.0325
7 Washbak dapur 1.000 bh Rp 250,000.00 0.0361
Kran bebek dapur 1.000 unit Rp 150,000.00 0.0217
8 Septic tank plus Sumur resapan 1.000 unit Rp 5,952,064.18 0.8591
9 Sumur peresapan air hujan 2.000 unit Rp 2,000,000.00 0.2887

VII PEKERJAAN ATAP


1 Pas Rangka Atap Baja Ringan 332.50 kg Rp 46,550,000.00 6.7191
2 Pas Genteng Morando Kebumen 332.500 m2 Rp 30,024,750.00 4.3338
3 Pas Bubungan Genteng 45.000 m1 Rp 4,063,500.00 0.5865
(termasuk nok pertigaan 1, nok ujung 2)
4 Lisplang dobel woodplank 58.000 m1 Rp 3,190,000.00 0.4605

IX PEKERJAAN PENGECATAN
1 Pek Cat Dinding Catylac 1,343.840 m2 Rp 36,100,245.84 5.2108
2 Pek Cat Plafond Kalsiboard 294.000 m2 Rp 7,897,869.00 1.1400
3 Pek Cat Genteng 332.500 m2 Rp 8,932,113.75 1.2893
4 Pek Melamin Doff Kayu
Kusen 146.600 m1 Rp 5,131,000.00 0.7406
Daun Pintu (17 daun) 34.000 m2 Rp 3,060,000.00 0.4417
Daun jendela jendela besar = 15 bh 60.000 m1 Rp 1,200,000.00 0.1732
jendela kecil = 24 bh 48.000 m1 Rp 960,000.00 0.1386

100
JUMLAH Rp 692,799,261.41

###
MINGGU KE
5 6 7 8 9 10 11 12 13 14 15 16

0.0161 0.0161
0.2774
0.8873 0.8873

1.9235
0.0242
0.5163 0.5163
2.7105 2.7105 2.7105
2.8790 2.8790 2.8790
0.1812

0.5196 0.5196
0.1949 0.1949
0.1299 0.1299

0.0144 0.0144
0.2165 0.2165

0.3804 0.3804
1.2927 1.2927
0.6670 0.6670

0.1156 0.1156 0.1156 0.1156


0.3928 0.3928 0.3928 0.3928
0.3283 0.3283 0.3283 0.3283

0.1521 0.1521 0.1521


0.5171 0.5171 0.5171
0.3361 0.3361 0.3361

0.0938
0.3642
0.3244
0.0730 0.0730
0.2835 0.2835
0.2104 0.2104
0.3043 0.3043
1.1819 1.1819
1.4036 1.4036

0.2165 0.2165
0.8411 0.8411
0.2104 0.2104

0.0619 0.0619
0.2405 0.2405
0.1530 0.1530

0.1773 0.1773 0.1773


1.6101 1.6101 1.6101

0.4745 0.4745 0.4745

0.2336 0.2336 0.2336 0.2336 0.2336 0.2336

0.0967 0.0967

0.0247 0.0247 0.0247 0.0247 0.0247 0.0247 0.0247 0.0247 0.0247


0.0289 0.0289 0.0289 0.0289 0.0289 0.0289 0.0289 0.0289 0.0289
0.0024 0.0024 0.0024 0.0024 0.0024 0.0024 0.0024 0.0024 0.0024
0.0024 0.0024 0.0024 0.0024 0.0024 0.0024 0.0024 0.0024 0.0024
0.0064 0.0064 0.0064 0.0064 0.0064 0.0064 0.0064 0.0064 0.0064
0.0010 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010
0.0023 0.0023 0.0023 0.0023 0.0023 0.0023 0.0023 0.0023 0.0023
0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
0.0174 0.0174 0.0174 0.0174 0.0174 0.0174 0.0174 0.0174 0.0174
0.0144 0.0144 0.0144 0.0144 0.0144 0.0144 0.0144 0.0144 0.0144
0.0080 0.0080 0.0080 0.0080 0.0080 0.0080 0.0080 0.0080 0.0080
0.0012 0.0012 0.0012 0.0012 0.0012 0.0012 0.0012 0.0012 0.0012
0.0016 0.0016 0.0016 0.0016 0.0016 0.0016 0.0016 0.0016 0.0016
0.0013 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013
0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183
0.0122 0.0122 0.0122 0.0122 0.0122 0.0122 0.0122 0.0122 0.0122
0.0289 0.0289 0.0289 0.0289 0.0289 0.0289 0.0289 0.0289 0.0289
0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
0.0079 0.0079 0.0079 0.0079 0.0079 0.0079 0.0079 0.0079 0.0079
0.0289 0.0289 0.0289 0.0289 0.0289 0.0289 0.0289 0.0289 0.0289
0.0024 0.0024 0.0024 0.0024 0.0024 0.0024 0.0024 0.0024 0.0024
0.0024 0.0024 0.0024 0.0024 0.0024 0.0024 0.0024 0.0024 0.0024
0.0064 0.0064 0.0064 0.0064 0.0064 0.0064 0.0064 0.0064 0.0064
0.0010 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010
0.0023 0.0023 0.0023 0.0023 0.0023 0.0023 0.0023 0.0023 0.0023
0.0080 0.0080 0.0080 0.0080 0.0080 0.0080 0.0080 0.0080 0.0080
0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
0.0283 0.0283 0.0283 0.0283 0.0283 0.0283 0.0283 0.0283 0.0283
0.0144 0.0144 0.0144 0.0144 0.0144 0.0144 0.0144 0.0144 0.0144
0.0080 0.0080 0.0080 0.0080 0.0080 0.0080 0.0080 0.0080 0.0080
0.0012 0.0012 0.0012 0.0012 0.0012 0.0012 0.0012 0.0012 0.0012
0.0016 0.0016 0.0016 0.0016 0.0016 0.0016 0.0016 0.0016 0.0016
0.0013 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013
0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
0.0658 0.0658 0.0658 0.0658 0.0658 0.0658 0.0658 0.0658 0.0658
0.0866 0.0866 0.0866 0.0866 0.0866 0.0866 0.0866 0.0866 0.0866
0.0144 0.0144 0.0144 0.0144 0.0144 0.0144 0.0144 0.0144 0.0144
0.0029 0.0029 0.0029 0.0029 0.0029 0.0029 0.0029 0.0029 0.0029
0.0241 0.0241 0.0241 0.0241 0.0241 0.0241 0.0241 0.0241 0.0241
0.0014 0.0014 0.0014 0.0014 0.0014 0.0014 0.0014 0.0014 0.0014
0.0024 0.0024 0.0024 0.0024 0.0024 0.0024 0.0024 0.0024 0.0024
0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019
0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
0.0137 0.0137 0.0137 0.0137 0.0137 0.0137 0.0137 0.0137 0.0137
0.0385 0.0385 0.0385 0.0385 0.0385 0.0385 0.0385 0.0385 0.0385
0.0192 0.0192 0.0192 0.0192 0.0192 0.0192 0.0192 0.0192 0.0192
0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
0.0128 0.0128 0.0128 0.0128 0.0128 0.0128 0.0128 0.0128 0.0128
0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
0.0846 0.0846 0.0846 0.0846 0.0846 0.0846 0.0846 0.0846 0.0846
0.0722 0.0722 0.0722 0.0722 0.0722 0.0722 0.0722 0.0722 0.0722
0.0401 0.0401 0.0401 0.0401 0.0401 0.0401 0.0401 0.0401 0.0401
0.0159 0.0159 0.0159 0.0159 0.0159 0.0159 0.0159 0.0159 0.0159
0.0048 0.0048 0.0048 0.0048 0.0048 0.0048 0.0048 0.0048 0.0048
0.0024 0.0024 0.0024 0.0024 0.0024 0.0024 0.0024 0.0024 0.0024
0.0032 0.0032 0.0032 0.0032 0.0032 0.0032 0.0032 0.0032 0.0032
0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
0.0152 0.0152 0.0152 0.0152 0.0152 0.0152 0.0152 0.0152 0.0152
0.0217 0.0217 0.0217 0.0217 0.0217 0.0217 0.0217 0.0217 0.0217
0.0055 0.0055 0.0055 0.0055 0.0055 0.0055 0.0055 0.0055 0.0055
0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007
0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007
0.0010 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010
0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120
0.0144 0.0144 0.0144 0.0144 0.0144 0.0144 0.0144 0.0144 0.0144
0.0024 0.0024 0.0024 0.0024 0.0024 0.0024 0.0024 0.0024 0.0024
0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005
0.0072 0.0072 0.0072 0.0072 0.0072 0.0072 0.0072 0.0072 0.0072
0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002
0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004
0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003
0.0024 0.0024 0.0024 0.0024 0.0024 0.0024 0.0024 0.0024 0.0024
0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
0.0091 0.0091 0.0091 0.0091 0.0091 0.0091 0.0091 0.0091 0.0091
0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120
0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007
0.0010 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010
0.0010 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010

0.1299 0.1299 0.1299 0.1299 0.1299 0.1299

0.1299 0.1299 0.1299 0.1299 0.1299 0.1299


0.1083 0.1083 0.1083 0.1083 0.1083 0.1083

1.2731 1.2731
0.8487
0.1443
0.2165
0.2979
0.1949
0.0808

0.0533
0.0302

0.0325
0.1083
0.0325
0.2165 0.2165
0.2887
0.0577
0.0325

0.0604 0.0604 0.0604


0.0369 0.0369 0.0369
0.0298 0.0298

0.0994
0.2189
0.0117
0.0325
0.0361
0.0217
0.2864 0.2864 0.2864
0.1443 0.1443

2.2397 2.2397 2.2397


1.4446 1.4446 1.4446
0.5865

0.4605

0.8685 0.8685 0.8685 0.8685 0.8685 0.8685


0.285 0.2850 0.2850 0.2850
0.2579 0.2579 0.2579 0.2579 0.2579

0.3703 0.3703
0.2208 0.2208
0.0866 0.0866
0.0693 0.0693
PEMERINTAH KABUPATEN BANYUMAS
DINAS PEKERJAAN UMUM KAB. BANYUMAS DAFTAR HARGA SATUAN
Jl.Jend. Gatot Subroto No.III-5 Telp.(0281) 637038 UPAH , BAHAN & ALAT
PURWOKERTO TAHUN 2015
HARGA SATUAN UPAH (Rp)
NO. SATUAN KODE JENIS UPAH PEK. SWAKELOLA PEK. DIBORONGKAN
Rp / OH Rp / OH Rp / Jam
A. UPAH
1 OH L.001 Tukang Batu - 65,000.00 9,285.71
2 OH L.002 Tukang Kayu - 65,000.00 9,285.71
3 OH L.003 Tukang Besi - 65,000.00 9,285.71
4 OH L.004 Tukang Cat - 65,000.00 9,285.71
5 OH L.005 Tukang Dempul - 65,000.00 9,285.71
6 OH L.006 Tukang Plistur - 65,000.00 9,285.71
7 OH L.007 Kepala Tukang - 70,000.00 10,000.00
8 OH L.008 Pekerja - 50,000.00 7,142.86
9 OH L.009 Pekerja Bongkar / Siram - 50,000.00 7,142.86
10 OH L.010 Mandor - 50,000.00 7,142.86
11 OH L.011 Tukang Batu Ahli - 70,000.00 10,000.00
12 OH L.012 Operator Mesin Poles - 80,000.00 10,000.00
11 OH L.021 Operator Alat Berat - 100,000.00 14,285.71
12 OH L.022 Pembantu Operator - 50,000.00 7,142.86
13 OH L.023 Sopir - 50,000.00 7,142.86
14 OH L.024 Pembantu Sopir - 45,000.00 6,428.57

HARGA SATUAN BAHAN (Rp)


NO. SATUAN KODE JENIS BAHAN
KATAGORI I (Mudah) KATAGORI II (Sulit)
1 2 3 4 5 6
B. BAHAN
001 M3 M.001 Pasir Beton 122,222.22 130,000.00
M3 M.001a Pasir Pasang 122,222.22 130,000.00
M3 M.001b Pasir Urug / Timbun 122,222.22 130,000.00
M3 M.001c Tanah Urug 60,000.00 70,000.00
M3 M.001d Kapur Pasang 250,000.00 300,000.00
M3 M.001e Sirtu 75,000.00 80,000.00
M3 M.001e1 Agregat Klas C 60,000.00 67,500.00
M3 M.001f Batu Kali Belah campur 128,571.43 140,000.00
M3 M.001f1 Batu belah 15 / 20 cm 140,000.00 150,000.00
M3 M.001f2 Batu belah 10 / 15 cm 150,000.00 160,000.00
M3 M.001f3 Batu pecah 5 / 7 cm 160,000.00 170,000.00
M3 M.001f4 Batu pecah 3 / 5 cm 170,000.00 180,000.00
M3 M.001g Batu Pecah 2/3 cm (Koral beton) 180,000.00 190,000.00
M3 M.001h Batu Pecah Mesin 2/3 cm 190,000.00 200,000.00
M3 M.001i Batu Pecah Mesin 1/2 cm 200,000.00 210,000.00
M3 M.001i1 Batu pecah 0,5 - 1 cm 210,000.00 220,000.00
M3 M.001i2 Batu pecah 0,2 - 0,50 cm 220,000.00 230,000.00
M3 M.001i3 Abu Batu 175,000.00 185,000.00
Kg M.001i4 Filler 100.00 125.00
Bh M.001j Batu Bata 600.00 650.00
M3 M.001k Batu Blonos 115,000.00 125,000.00
Kg M.001l Tali Ijuk 5,500.00 6,000.00
M3 M.001n Batu Kerikil 40,000.00 50,000.00
M3 M.001o Ijuk 270,000.00 290,000.00
Bh M.001p Sikat Kawat / Plastik 6,500.00 6,500.00

halaman 13 / 51
PEMERINTAH KABUPATEN BANYUMAS
DINAS PEKERJAAN UMUM KAB. BANYUMAS DAFTAR HARGA SATUAN
Jl.Jend. Gatot Subroto No.III-5 Telp.(0281) 637038 UPAH , BAHAN & ALAT
PURWOKERTO TAHUN 2015
HARGA SATUAN BAHAN (Rp)
NO. SATUAN KODE JENIS BAHAN KATAGORI I (Mudah) KATAGORI II (Sulit)
1 2 3 4 5 6
002 Zak M.002 Portland Cement 50 Kg 64,000.00 65,000.00
Kg M.002a Portland Cement 1,280.00 1,300.00
Kg M.002b PC Warna 6,000.00 10,000.00

003 Kg M.003 Besi Beton ( Polos ) 12,000.00 13,000.00


Kg M.003a Bindrat 20,000.00 20,000.00
Kg M.003b Besi Siku / Propil 11,000.00 10,000.00
Kg M.003c Besi Beton ( Ulir ) 13,000.00 14,000.00
Bh M.003d Begel ( Besi Strip ) 20,000.00 6,500.00
Kg M.003e Kawat Bronjong Ø 4 mm 10,500.00 11,000.00

004 Bh M.004 Keramik Lantai 20 x 20 cm KW.I 1,700.00 1,800.00


Bh M.004a Keramik Lantai 20 x 20 cm KW.II 1,500.00 1,600.00
Bh M.004b Keramik Lantai 33 x 33 cm KW.I 5,000.00 5,500.00
Bh M.004c Keramik Lantai 33 x 33 cm KW.II 4,750.00 5,250.00
Bh M.004d Keramik Lantai 40 x 40 cm KW.I 6,000.00 8,250.00
Bh M.004e Keramik Lantai 40 x 40 cm KW.II 7,000.00 7,500.00
Bh M.004f Keramik Lantai 30 x 30 cm KW.I 3,500.00 3,750.00
Bh M.004g Keramik Lantai 30 x 30 cm KW.II 3,000.00 3,250.00
Bh M.004h Keramik Lantai 33x33 cm Anti Slip KW.I 4,500.00 4,750.00
Bh M.004i Keramik Lantai 33x33 cm Anti Slip KW.II 3,750.00 4,000.00
Bh M.004j Keramik Lantai 40x40 cm Anti Slip KW.I 6,000.00 8,000.00
Bh M.004k Keramik Lantai 40x40 cm Anti Slip KW.II 7,000.00 7,500.00
Bh M.004l Keramik Lantai 30x30 cm Anti Slip KW.I 3,500.00 3,750.00
Bh M.004m Keramik Lantai 30x30 cm Anti Slip KW.II 3,250.00 3,500.00
Bh M.004n Keramik Dinding 20 x 20 cm KW.I 1,750.00 2,000.00
Bh M.004o Keramik Dinding 20 x 20 cm KW.II 1,600.00 1,850.00
Bh M.004p Ubin Abu-abu 20 x 20 cm 700.00 800.00
Bh M.004q Ubin Abu-abu 30 x 30 cm 2,000.00 2,250.00
M2 M.004r Lembaran Granit lokal 250,000.00 300,000.00
M2 M.004s Lembaran Granit Import 1,125,000.00 1,500,000.00
M2 M.004t Batu Candi 120,000.00 125,000.00
M2 M.004u Batu Koral Hitam 112,500.00 130,000.00
M2 M.004v Lembaran Granit Import 750,000.00 750,000.00

005 M3 M.005 Glugu Tua 1,500,000.00 1,200,000.00


M3 M.005a Kayu Tahun 1,500,000.00 1,200,000.00
M3 M.005b Kayu Meranti Balok 4,010,000.00 4,035,000.00
M3 M.005c Kayu Kruing Balok 5,220,000.00 5,245,000.00
M3 M.005d Kayu Bangkir Balok 6,950,000.00 6,975,000.00
M3 M.005d1 Kayu Bangkir Balok (uk. khusus) 7,500,000.00 7,500,000.00
M3 M.005e Kayu Kamper Balok 6,804,000.00 6,829,000.00
M3 M.005f Kayu Jati Balok (lokal) 11,000,000.00 11,100,000.00
M3 M.005f1 Kayu Jati Balok Klas I (Kw. Eksport) 35,000,000.00 35,000,000.00
M3 M.005g Usuk Meranti 5/7 3,645,000.00 3,670,000.00
M3 M.005h Usuk Kruing 5/7 4,900,000.00 4,925,000.00
M3 M.005i Usuk Bangkir 5/7 6,100,000.00 6,125,000.00
M3 M.005i1 Usuk Bangkir 5/10 (uk. khusus) 6,400,000.00 6,400,000.00
M3 M.005j Usuk Kamper 5/7 5,850,000.00 5,875,000.00
M3 M.005k Usuk Jati 5/7 9,500,000.00 9,600,000.00
M3 M.005l Papan Meranti 4,275,000.00 4,300,000.00
M3 M.005m Papan Kruing 5,600,000.00 5,625,000.00
M3 M.005n Papan Bangkir 7,700,000.00 7,725,000.00
M3 M.005o Papan Kamper 7,450,000.00 7,475,000.00
M3 M.005p Papan Jati (lokal) 11,500,000.00 11,600,000.00
M3 M.005p1 Papan Jati Klas I (Kw. Eksport) 38,000,000.00 38,000,000.00
M' M.005q Lis kayu propil ( kayu kruing ) 5,500.00 6,000.00
M' M.005r Lis kayu kruing 3,500.00 4,000.00
Btg M.005s Dolken kayu dim. 8 - 10 P : 4m 30,000.00 35,000.00
Btg M.005t Usuk 5/7 kayu tahun 17,500.00 18,000.00
M3 M.005u Kayu Perancah 975,000.00 1,000,000.00

006 Kg M.006 Paku Biasa ( 2" - 5") usuk,reng,plafon 20,000.00 9,000.00


Kg M.006a Paku Eternit, Lis 23,000.00 11,000.00

halaman 14 / 51
PEMERINTAH KABUPATEN BANYUMAS
DINAS PEKERJAAN UMUM KAB. BANYUMAS DAFTAR HARGA SATUAN
Jl.Jend. Gatot Subroto No.III-5 Telp.(0281) 637038 UPAH , BAHAN & ALAT
PURWOKERTO TAHUN 2015
Kg M.006b Paku Kait 23,000.00 28,000.00
Kg M.006c Paku Seng ( 1/2" - 1") 23,000.00 23,750.00
Bj M.006d Paku Payung 450.00 450.00

halaman 15 / 51
PEMERINTAH KABUPATEN BANYUMAS
DINAS PEKERJAAN UMUM KAB. BANYUMAS DAFTAR HARGA SATUAN
Jl.Jend. Gatot Subroto No.III-5 Telp.(0281) 637038 UPAH , BAHAN & ALAT
PURWOKERTO TAHUN 2015
HARGA SATUAN BAHAN (Rp)
NO. SATUAN KODE JENIS BAHAN KATAGORI I (Mudah) KATAGORI II (Sulit)
1 2 3 4 5 6
Bj M.006e Paku Sumbat 350.00 350.00
Btg M.006f Bambu 7,500.00 8,000.00
Bj M.006g Skrup 3.5" 550.00 550.00
Kg M.006h Skrup 36,000.00 36,000.00
Kg M.006i Paku beton 5 cm 25,000.00 5,000.00

007 Lbr M.007 Eternit Kerang Super 6,000.00 6,000.00


M2 M.007a Harplek 4 mm 17,000.00 17,000.00
Lbr M.007b Gypsum board tb. 9 mm 35,500.00 35,750.00
008 M2 M.008 Kaca Bening 3 mm 48,000.00 51,000.00
M2 M.008a Kaca Bening 5 mm 65,000.00 66,000.00
M2 M.008b Kaca Polos 8 mm 155,000.00 159,000.00
M2 M.008c Kaca Cermin 5 mm 150,000.00 151,000.00
M2 M.008d Kawat burung 14,000.00 15,000.00

009 M2 M.009 Triplek 3 mm 24,000.00 25,300.00


Lbr M.009a Triplek 3 mm 0,9 x 2,1 m 46,000.00 47,500.00
M2 M.009b Multiplek 9 mm 74,000.00 75,600.00
Lbr M.009c Multiplek 9 mm 0,9 x 2,1 m 140,000.00 143,000.00
M2 M.009d Teakwood 3 mm 31,750.00 31,750.00
Lbr M.009e Teakwood 3 mm 0,9 x 2,1 m 60,000.00 60,000.00

010 Bj M.010 Genteng Vlams Sokka 650.00 675.00


Bj M.010a Genteng Pres Plentong 880.00 925.00
Bj M.010b Genteng Pres Kodok 1,200.00 1,210.00
Bj M.010c Genteng Nok Pres Sokka 2,750.00 2,800.00
Bj M.010d Genteng Margase 2,500.00 2,500.00
Bj M.010e Genteng Morando 2,750.00 2,750.00
Bj M.010f Genteng Nok Morando / Margase 3,750.00 3,750.00
Bj M.010g Genteng Paris Sokka 1,500.00 1,500.00
Bj M.010h Genteng Nok Paris Sokka 4,500.00 4,500.00
Bj M.010i Genteng Nok Beton 4,000.00 4,000.00
Bj M.010j Genteng Beton 3,800.00 3,800.00
Bj M.010k Genteng Keramik natural 7,400.00 5,100.00
Lbr M.010l Seng Gelombang BJLS 20 ( 0,90 x 1,80 ) 37,000.00 38,000.00
Lbr M.010m Seng Gelombang BJLS 30 ( 0,90 x 1,80 ) 40,000.00 42,000.00
Lbr M.010n Seng Plat BJLS 30 ( 0,90 x 1,80 ) 24,000.00 25,000.00
Lbr M.010o Asbes Gelombang 4 mm ( 3,00 x 1,05 ) x 4 mm 78,000.00 80,000.00
Lbr M.010p Asbes Gelombang 4 mm ( 2,70 x 1,05 ) x 4 mm 70,000.00 72,000.00
Lbr M.010q Asbes Gelombang 4 mm ( 2,40 x 1,05 ) x 4 mm 62,000.00 64,000.00
Lbr M.010r Asbes Gelombang 4 mm ( 2,10 x 1,05 ) x 4 mm 55,000.00 57,000.00
Lbr M.010s Asbes Gelombang 4 mm ( 1,50 x 1,05 ) x 4 mm 39,500.00 41,500.00
Psg M.010t Nok Still Asbes Gelombang 27,500.00 28,000.00
M2 M.010u Aluminium Foil / Sisalation 13,000.00 13,500.00
Lbr M.010v Seng Galvalum 290,000.00 300,000.00
011 Kg M.011 Cat Kayu setingkat AVIAN 32,500.00 33,000.00
Kg M.011a Cat Tembok untuk interior (sekualitas Mowilex) 90,000.00 36,500.00
Kg M.011a.1 Cat Tembok untuk exterior (sekualitas Mowilex) 90,000.00 59,000.00
Kg M.011b Cat Tembok (sekualitas Catylac) 17,000.00 14,000.00
Kg M.011c Cat Tembok (sekualitas Decolith) 17,000.00 12,500.00
Kg M.011d Cat Tembok (sekualitas Mollex) 90,000.00 6,000.00
Kg M.011e Cat Genteng (sekualitas Tamitex) 22,000.00 22,000.00
Kg M.011f Cat Meni 11,000.00 12,000.00
Kg M.011g Minyak Cat 5,000.00 6,000.00
Kg M.011h Meni Besi 11,000.00 12,000.00
Ltr M.011i Thinner 15,000.00 15,000.00
Kg M.011j Cat minyak 35,000.00 35,000.00
Kg M.011k Cat Marka Jalan 20,000.00 20,000.00
Kg M.011l Glass Bit 15,000.00 15,000.00
Ltr M.011m Curing Compund 7,500.00 7,500.00

012 Kg M.012 Batu Kambang / Apung 6,275.00 6,500.00


Kg M.012a Plamir Tembok 7,500.00 7,500.00

halaman 16 / 51
PEMERINTAH KABUPATEN BANYUMAS
DINAS PEKERJAAN UMUM KAB. BANYUMAS DAFTAR HARGA SATUAN
Jl.Jend. Gatot Subroto No.III-5 Telp.(0281) 637038 UPAH , BAHAN & ALAT
PURWOKERTO TAHUN 2015
HARGA SATUAN BAHAN (Rp)
NO. SATUAN KODE JENIS BAHAN
KATAGORI I (Mudah) KATAGORI II (Sulit)
1 2 3 4 5 6
Kg M.012b Plamir Kayu 13,000.00 13,500.00
Lbr M.012c Amplas 2,000.00 2,000.00
Kg M.012d Dempul Lilin 7,000.00 7,500.00
Kg M.012e Dempul Kayu 11,000.00 11,500.00
Kg M.012f Kapur sirih / Labur / Gamping 1,800.00 2,000.00
Kg M.012g Lem Kayu 11,000.00 11,500.00
Kg M.012h Politur 25,000.00 25,000.00
Ikat M.012i Alang-alang 2,000.00 2,200.00
ltr M.012j Tir Kayu 3,000.00 3,000.00
ltr M.012k OlI 37,000.00 37,000.00
Kg M.012l Soda api 15,000.00 16,000.00
M3 M.012m Perancah kayu hapus 950,000.00 950,000.00
Bh M.012n Kuas 3,800.00 4,000.00
Ltr M.012o Resin warna 47,000.00 47,000.00
Ltr M.012p Cairan coating 19,000.00 19,000.00
set M.012q Batu grenda poles 380,000.00 380,000.00
Kg M.012r Obat poles 120,000.00 120,000.00
Glg M.012s Kain poles 4,000.00 4,000.00
Bh M.012t Kain pel 4,500.00 4,500.00
Kg M.012u Semir lantai sek. MAA 17,000.00 17,000.00
013 M2 M.013 Paving Blok Natural 6 cm 60,000.00 32,000.00
M2 M.013a Paving Blok Warna 6 cm 60,000.00 36,000.00
M2 M.013b Paving Blok Aldas t : 10 cm K - 400 80,000.00 128,000.00
M2 M.013c Paving Blok Aldas t : 6 cm K - 300 80,000.00 65,000.00
014 Bh M.014 Kunci tanam antik 300,000.00 300,000.00
Bh M.014a Kunci tanam biasa sek. Yalle 85,000.00 85,000.00
Bh M.014b Kunci tanam kamar mandi 32,000.00 32,000.00
Bh M.014c Engsel pintu 7,000.00 7,000.00
Bh M.014d Engsel jendela kupu-kupu 4,500.00 4,500.00
Bh M.014e Engsel angin 20,000.00 20,000.00
Bh M.014f Kait Angin model lipat 5,000.00 5,000.00
Bh M.014f.1 Kait Angin model antik 16,500.00 16,500.00
Bh M.014g Door Closer 200,000.00 200,000.00
Bh M.014h Kunci slot 85,000.00 85,000.00
Bh M.014i Pegangan Pintu / Door Holder 175,500.00 175,500.00
Bh M.014j Door Stop 25,000.00 25,000.00
Bh M.014k Rel Pintu Dorong 300,000.00 310,000.00
015 Bh M.015 Kloset duduk sek. Toto 1,400,000.00 1,425,000.00
Bh M.015a Kloset jongkok sek. Toto 150,000.00 155,000.00
Bh M.015b U r i n o i r sek. Toto 400,000.00 420,000.00
Bh M.015c W a s t a f e l sek. Toto 475,000.00 480,000.00
Bh M.015d Bak Mandi Fiberglass 150,000.00 157,000.00
Bh M.015d.1 Bak Fiberglass 340,000.00 340,000.00
Bh M.015e Bathkip 3,861,000.00 4,000,000.00
Bh M.015f Bak Cuci Piring Stainless 1 ruang 206,000.00 215,000.00
Bh M.015g Water drain + asesories 29,000.00 29,000.00
Bh M.015h Kran air 3/4" 60,000.00 20,000.00
Bh M.015h.1 Kran air 1/2" 60,000.00 15,000.00
Bh M.015i Seal tape 2,000.00 2,000.00
Bh M.015j Floor Drain 19,000.00 20,000.00
016 M' M.016 Pipa Galvanis 1/2" med. B 13,000.00 13,500.00
M' M.016a Pipa Galvanis 3/4" med. B 16,000.00 16,500.00
M' M.016b Pipa Galvanis 1" med. B 21,000.00 22,000.00
M' M.016c Pipa Galvanis 1 1/2" med. B 29,000.00 31,000.00
M' M.016d Pipa Galvanis 2" med. B 48,000.00 50,000.00
M' M.016e Pipa Galvanis 3" med. B 76,000.00 78,000.00
M' M.016f Pipa Galvanis 4" med. B 101,000.00 105,000.00
M' M.016g Pipa PVC 1/2" type AW 2,800.00 3,000.00
M' M.016h Pipa PVC 3/4" type AW 4,000.00 4,500.00
M' M.016i Pipa PVC 1" type AW 5,000.00 6,000.00
M' M.016j Pipa PVC 1 1/2" type AW 10,000.00 11,000.00
M' M.016k Pipa PVC 2" type AW 13,000.00 14,000.00

halaman 17 / 51
PEMERINTAH KABUPATEN BANYUMAS
DINAS PEKERJAAN UMUM KAB. BANYUMAS DAFTAR HARGA SATUAN
Jl.Jend. Gatot Subroto No.III-5 Telp.(0281) 637038 UPAH , BAHAN & ALAT
PURWOKERTO TAHUN 2015
M' M.016l Pipa PVC 3" type AW 27,000.00 28,000.00
M' M.016m Pipa PVC 4" type AW 45,000.00 46,000.00

halaman 18 / 51
19 / 51
PEMERINTAH KABUPATEN BANYUMAS ANALISA HARGA SATUAN PEKERJAAN
DINAS PEKERJAAN UMUM
Jl.Jend. Gatot Subroto No.III-5 Telp.(0281) 637038 TAHUN 2015
KODE KOEFISIE SATU KATAGORI K-I (Mudah) KATAGORI K-II (Sulit) SWAKELOLA
JENIS & URAIAN PEKERJAN
ANALISA N AN HRG SAT(Rp) HARGA (Rp) HRG SAT(Rp) HARGA (Rp) HRG SAT(Rp) HARGA (Rp)
1 2 3 4 6 7=3X6 8 9=3X8 10 11 = 3 X 10
A. PEKERJAAN PERSIAPAN
Pengukuran dan Pemasangan Bouwplank (Kayu
SNI - A.6.4a M' 41,350.00 35,430.00 28,900.00
Tahun)
M.005a Usuk 5/7 kayu Tahun 0.0120 M3 1,500,000.00 18,000.00 1,200,000.00 14,400.00 1,500,000.00 18,000.00
M.006 Paku Biasa ( 2" - 5" ) 0.0200 Kg 20,000.00 400.00 9,000.00 180.00 20,000.00 400.00
M.005a Papan kayu Tahun 3/20 0.0070 M3 1,500,000.00 10,500.00 1,200,000.00 8,400.00 1,500,000.00 10,500.00
L.008 Pekerja 0.1000 OH 50,000.00 5,000.00 50,000.00 5,000.00 - -
L.002 Tukang Kayu 0.1000 OH 65,000.00 6,500.00 65,000.00 6,500.00 - -
L.007 Kepala Tukang 0.0100 OH 70,000.00 700.00 70,000.00 700.00 - -
L.010 Mandor 0.0050 OH 50,000.00 250.00 50,000.00 250.00 - -
Pembuatan Gudang Semen dan Alat-alat (Kayu
SNI - A.6.6a M2 650,106.67 594,750.00 453,606.67
Tahun )
M.005s Dolken kayu diam. 8-10 / 4 m 1.7000 Btg 30,000.00 51,000.00 35,000.00 59,500.00 30,000.00 51,000.00
M.005a Papan kayu Tahun 3/20 0.2100 M3 1,500,000.00 315,000.00 1,200,000.00 252,000.00 1,500,000.00 315,000.00
M.006 Paku Biasa ( 2" - 5" ) 0.3000 Kg 20,000.00 6,000.00 9,000.00 2,700.00 20,000.00 6,000.00
M.002a Portland Cement 10.5000 Kg 1,280.00 13,440.00 1,300.00 13,650.00 1,280.00 13,440.00
M.001 Pasir Beton 0.0300 M3 122,222.22 3,666.67 130,000.00 3,900.00 122,222.22 3,666.67
M.001g Koral Beton ( Batu Pecah 2/3 ) 0.0500 M3 180,000.00 9,000.00 190,000.00 9,500.00 180,000.00 9,000.00
M.010l Seng Gelombang BJLS 20 1.5000 Lbr 37,000.00 55,500.00 38,000.00 57,000.00 37,000.00 55,500.00
L.008 Pekerja 1.0000 OH 50,000.00 50,000.00 50,000.00 50,000.00 - -
L.002 Tukang Kayu 2.0000 OH 65,000.00 130,000.00 65,000.00 130,000.00 - -
L.007 Kepala Tukang 0.2000 OH 70,000.00 14,000.00 70,000.00 14,000.00 - -
L.010 Mandor 0.0500 OH 50,000.00 2,500.00 50,000.00 2,500.00 - -

SNI - A.6.8 Membersihkan Lapangan dan Perataan M2 SNIA.6.8 7,500.00 SN2A.6.8 7,500.00 SNSA.6.8 -
L.008 Pekerja 0.1000 OH 50,000.00 5,000.00 50,000.00 5,000.00 - -
L.010 Mandor 0.0500 OH 50,000.00 2,500.00 50,000.00 2,500.00 - -

B. PEKERJAAN TANAH

SNI - B.6.3 Galian Tanah Biasa Sedalam 3 meter M3 SNIB.6.3 40,400.00 SN2B.6.3 40,400.00 SNSB.6.3 -
L.008 Pekerja 0.7350 OH 50,000.00 36,750.00 50,000.00 36,750.00 - -
L.010 Mandor 0.0730 OH 50,000.00 3,650.00 50,000.00 3,650.00 - -
20 / 51
PEMERINTAH KABUPATEN BANYUMAS ANALISA HARGA SATUAN PEKERJAAN
DINAS PEKERJAAN UMUM
Jl.Jend. Gatot Subroto No.III-5 Telp.(0281) 637038 TAHUN 2015
KODE KOEFISIE SATU KATAGORI K-I (Mudah) KATAGORI K-II (Sulit) SWAKELOLA
JENIS & URAIAN PEKERJAN
ANALISA N AN HRG SAT(Rp) HARGA (Rp) HRG SAT(Rp) HARGA (Rp) HRG SAT(Rp) HARGA (Rp)
1 2 3 4 6 7=3X6 8 9=3X8 10 11 = 3 X 10
SNI - B.6.4 Galian Tanah Keras Sedalam 1 meter M3 SNIB.6.4 34,350.00 SN2B.6.4 34,350.00 SNSB.6.4 -
L.008 Pekerja 0.6250 OH 50,000.00 31,250.00 50,000.00 31,250.00 - -
L.010 Mandor 0.0620 OH 50,000.00 3,100.00 50,000.00 3,100.00 - -
SNI - B.6.9 Urugan Kembali M3 SNIB.6.9 10,550.00 SN2B.6.9 10,550.00 SNSB.6.9 -
L.008 Pekerja 0.1920 OH 50,000.00 9,600.00 50,000.00 9,600.00 - -
L.010 Mandor 0.0190 OH 50,000.00 950.00 50,000.00 950.00 - -
SNI - B.6.11 Urugan Pasir M3 SNIB.6.11 162,166.67 SN2B.6.11 171,500.00 SNSB.6.11 146,666.67
M.001b Pasir urug 1.2000 M3 122,222.22 146,666.67 130,000.00 156,000.00 122,222.22 146,666.67
L.008 Pekerja 0.3000 OH 50,000.00 15,000.00 50,000.00 15,000.00 - -
L.010 Mandor 0.0100 OH 50,000.00 500.00 50,000.00 500.00 - -
SNI - B.6.15 Urugan Sirtu M3 SNIB.6.15 103,750.00 SN2B.6.15 109,750.00 SNSB.6.15 90,000.00
M.001e Sirtu 1.2000 M3 75,000.00 90,000.00 80,000.00 96,000.00 75,000.00 90,000.00
L.008 Pekerja 0.2500 OH 50,000.00 12,500.00 50,000.00 12,500.00 - -
L.010 Mandor 0.0250 OH 50,000.00 1,250.00 50,000.00 1,250.00 - -
C. PEKERJAAN PONDASI BATU KALI

SNI - C.6.6 Pas. Pondasi Batu Kali 1 PC : 5 Psr M3 SNIC.6.6 516,518.89 SN2C.6.6 534,470.00 SNSC.6.6 394,568.89
M.001f1 Batu Belah 15/20 cm 1.1000 M3 140,000.00 154,000.00 150,000.00 165,000.00 140,000.00 154,000.00
M.002a Portland Cement 136.00 Kg 1,280.00 174,080.00 1,300.00 176,800.00 1,280.00 174,080.00
M.001a Pasir Pasang 0.5440 M3 122,222.22 66,488.89 130,000.00 70,720.00 122,222.22 66,488.89
L.008 Pekerja 1.5000 OH 50,000.00 75,000.00 50,000.00 75,000.00 - -
L.001 Tukang Batu 0.6000 OH 65,000.00 39,000.00 65,000.00 39,000.00 - -
L.007 Kepala Tukang 0.0600 OH 70,000.00 4,200.00 70,000.00 4,200.00 - -
L.010 Mandor 0.0750 OH 50,000.00 3,750.00 50,000.00 3,750.00 - -
D. PEKERJAAN DINDING

SNI - D.6.12 Pas. Batu Merah tb. 1/2 bata 1 PC : 5 Psr M2 SNID.6.12 83,840.40 SN2D.6.12 71,084.00 SNSD.6.12 49,390.40
M.001j Batu Merah (5x11x22cm) 70.0000 Bh 600.00 42,000.00 410.00 28,700.00 450.00 31,500.00
21 / 51
PEMERINTAH KABUPATEN BANYUMAS ANALISA HARGA SATUAN PEKERJAAN
DINAS PEKERJAAN UMUM
Jl.Jend. Gatot Subroto No.III-5 Telp.(0281) 637038 TAHUN 2015
KODE KOEFISIE SATU KATAGORI K-I (Mudah) KATAGORI K-II (Sulit) SWAKELOLA
JENIS & URAIAN PEKERJAN
ANALISA N AN HRG SAT(Rp) HARGA (Rp) HRG SAT(Rp) HARGA (Rp) HRG SAT(Rp) HARGA (Rp)
1 2 3 4 6 7=3X6 8 9=3X8 10 11 = 3 X 10
M.002a Portland Cement 9.6800 Kg 1,280.00 12,390.40 1,300.00 12,584.00 1,280.00 12,390.40
M.001a Pasir Pasang 0.0450 M3 122,222.22 5,500.00 130,000.00 5,850.00 122,222.22 5,500.00
L.008 Pekerja 0.3200 OH 50,000.00 16,000.00 50,000.00 16,000.00 - -
L.001 Tukang Batu 0.1000 OH 65,000.00 6,500.00 65,000.00 6,500.00 - -
L.007 Kepala Tukang 0.0100 OH 70,000.00 700.00 70,000.00 700.00 - -
L.010 Mandor 0.0150 OH 50,000.00 750.00 50,000.00 750.00 - -
E. PEKERJAAN PLESTERAN

SNI - E.6.3 Plesteran 1 PC : 3 Psr tb. 1,5 cm M2 SNIE.6.3 31,916.62 SN2E.6.3 32,194.00 SNSE.6.3 10,616.62
M.002a Portland Cement 6.4800 Kg 1,280.00 8,294.40 1,300.00 8,424.00 1,280.00 8,294.40
M.001a Pasir Pasang 0.0190 M3 122,222.22 2,322.22 130,000.00 2,470.00 122,222.22 2,322.22
L.008 Pekerja 0.2000 OH 50,000.00 10,000.00 50,000.00 10,000.00 - -
L.001 Tukang Batu 0.1500 OH 65,000.00 9,750.00 65,000.00 9,750.00 - -
L.007 Kepala Tukang 0.0150 OH 70,000.00 1,050.00 70,000.00 1,050.00 - -
L.010 Mandor 0.0100 OH 50,000.00 500.00 50,000.00 500.00 - -
SNI - E.6.5 Plesteran 1 PC : 5 Psr tb. 1,5 cm M2 SNIE.6.5 29,518.49 SN2E.6.5 29,776.00 SNSE.6.5 8,218.49
M.002a Portland Cement 4.3200 Kg 1,280.00 5,529.60 1,300.00 5,616.00 1,280.00 5,529.60
M.001a Pasir Pasang 0.0220 M3 122,222.22 2,688.89 130,000.00 2,860.00 122,222.22 2,688.89
L.008 Pekerja 0.2000 OH 50,000.00 10,000.00 50,000.00 10,000.00 - -
L.001 Tukang Batu 0.1500 OH 65,000.00 9,750.00 65,000.00 9,750.00 - -
L.007 Kepala Tukang 0.0150 OH 70,000.00 1,050.00 70,000.00 1,050.00 - -
L.010 Mandor 0.0100 OH 50,000.00 500.00 50,000.00 500.00 - -
SNI - E.6.9 Plesteran 1 PC : 3 Kp : 10 Psr tb. 1,5 cm M2 SNIE.6.9 26,866.31 SN2E.6.9 27,312.00 SNSE.6.9 5,566.31
M.002a Portland Cement 1.8400 Kg 1,280.00 2,355.20 1,300.00 2,392.00 1,280.00 2,355.20
M.001d Kapur Padam 0.0060 M3 250,000.00 1,500.00 300,000.00 1,800.00 250,000.00 1,500.00
M.001a Pasir Pasang 0.0140 M3 122,222.22 1,711.11 130,000.00 1,820.00 122,222.22 1,711.11
L.008 Pekerja 0.2000 OH 50,000.00 10,000.00 50,000.00 10,000.00 - -
L.001 Tukang Batu 0.1500 OH 65,000.00 9,750.00 65,000.00 9,750.00 - -
L.007 Kepala Tukang 0.0150 OH 70,000.00 1,050.00 70,000.00 1,050.00 - -
L.010 Mandor 0.0100 OH 50,000.00 500.00 50,000.00 500.00 - -
22 / 51
PEMERINTAH KABUPATEN BANYUMAS ANALISA HARGA SATUAN PEKERJAAN
DINAS PEKERJAAN UMUM
Jl.Jend. Gatot Subroto No.III-5 Telp.(0281) 637038 TAHUN 2015
KODE KOEFISIE SATU KATAGORI K-I (Mudah) KATAGORI K-II (Sulit) SWAKELOLA
JENIS & URAIAN PEKERJAN
ANALISA N AN HRG SAT(Rp) HARGA (Rp) HRG SAT(Rp) HARGA (Rp) HRG SAT(Rp) HARGA (Rp)
1 2 3 4 6 7=3X6 8 9=3X8 10 11 = 3 X 10
SNI - E.6.14 Plesteran 1 PC : 3 Psr tb. 2 cm M2 SNIE.6.14 44,526.78 SN2E.6.14 44,945.00 SNSE.6.14 17,001.78
M.002a Portland Cement 10.8000 Kg 1,280.00 13,824.00 1,300.00 14,040.00 1,280.00 13,824.00
M.001a Pasir Pasang 0.0260 M3 122,222.22 3,177.78 130,000.00 3,380.00 122,222.22 3,177.78
L.008 Pekerja 0.2500 OH 50,000.00 12,500.00 50,000.00 12,500.00 - -
L.001 Tukang Batu 0.2000 OH 65,000.00 13,000.00 65,000.00 13,000.00 - -
L.007 Kepala Tukang 0.0200 OH 70,000.00 1,400.00 70,000.00 1,400.00 - -
L.010 Mandor 0.0125 OH 50,000.00 625.00 50,000.00 625.00 - -
SNI - E.6.16 Plesteran 1 PC : 5 Psr tb. 2 cm M2 SNIE.6.16 40,278.42 SN2E.6.16 40,642.00 SNSE.6.16 12,753.42
M.002a Portland Cement 7.2900 Kg 1,280.00 9,331.20 1,300.00 9,477.00 1,280.00 9,331.20
M.001a Pasir Pasang 0.0280 M3 122,222.22 3,422.22 130,000.00 3,640.00 122,222.22 3,422.22
L.008 Pekerja 0.2500 OH 50,000.00 12,500.00 50,000.00 12,500.00 - -
L.001 Tukang Batu 0.2000 OH 65,000.00 13,000.00 65,000.00 13,000.00 - -
L.007 Kepala Tukang 0.0200 OH 70,000.00 1,400.00 70,000.00 1,400.00 - -
L.010 Mandor 0.0125 OH 50,000.00 625.00 50,000.00 625.00 - -
SNI - E.6.30 Plesteran Beton 1 PC : 5 Psr tb. 1,5 cm M2 SNIE.6.30 39,666.27 SN2E.6.30 39,971.00 SNSE.6.30 11,616.27
M.002a Portland Cement 7.0700 Kg 1,280.00 9,049.60 1,300.00 9,191.00 1,280.00 9,049.60
M.001a Pasir Pasang 0.0210 M3 122,222.22 2,566.67 130,000.00 2,730.00 122,222.22 2,566.67
L.008 Pekerja 0.2600 OH 50,000.00 13,000.00 50,000.00 13,000.00 - -
L.001 Tukang Batu 0.2000 OH 65,000.00 13,000.00 65,000.00 13,000.00 - -
L.007 Kepala Tukang 0.0200 OH 70,000.00 1,400.00 70,000.00 1,400.00 - -
L.010 Mandor 0.0130 OH 50,000.00 650.00 50,000.00 650.00 - -
SNI - E.6.31 Plesteran Skoning 1 PC : 2 Psr M1 SNIE.6.31 8,964.44 SN2E.6.31 8,990.00 SNSE.6.31 884.44
M.002a Portland Cement 0.5000 Kg 1,280.00 640.00 1,300.00 650.00 1,280.00 640.00
M.001a Pasir Pasang 0.0020 M3 122,222.22 244.44 130,000.00 260.00 122,222.22 244.44
L.008 Pekerja 0.0570 OH 50,000.00 2,850.00 50,000.00 2,850.00 - -
L.001 Tukang Batu 0.0380 OH 65,000.00 2,470.00 65,000.00 2,470.00 - -
L.007 Kepala Tukang 0.0380 OH 70,000.00 2,660.00 70,000.00 2,660.00 - -
L.010 Mandor 0.0020 OH 50,000.00 100.00 50,000.00 100.00 - -
SNI - E.6.35 Plesteran Siar Adukan 1 PC : 2 Psr M2 SNIE.6.35 20,425.16 SN2E.6.35 20,636.00 SNSE.6.35 7,485.16
23 / 51
PEMERINTAH KABUPATEN BANYUMAS ANALISA HARGA SATUAN PEKERJAAN
DINAS PEKERJAAN UMUM
Jl.Jend. Gatot Subroto No.III-5 Telp.(0281) 637038 TAHUN 2015
KODE KOEFISIE SATU KATAGORI K-I (Mudah) KATAGORI K-II (Sulit) SWAKELOLA
JENIS & URAIAN PEKERJAN
ANALISA N AN HRG SAT(Rp) HARGA (Rp) HRG SAT(Rp) HARGA (Rp) HRG SAT(Rp) HARGA (Rp)
1 2 3 4 6 7=3X6 8 9=3X8 10 11 = 3 X 10
M.002a Portland Cement 4.3200 Kg 1,280.00 5,529.60 1,300.00 5,616.00 1,280.00 5,529.60
M.001a Pasir Pasang 0.0160 M3 122,222.22 1,955.56 130,000.00 2,080.00 122,222.22 1,955.56
L.008 Pekerja 0.1500 OH 50,000.00 7,500.00 50,000.00 7,500.00 - -
L.001 Tukang Batu 0.0700 OH 65,000.00 4,550.00 65,000.00 4,550.00 - -
L.007 Kepala Tukang 0.0070 OH 70,000.00 490.00 70,000.00 490.00 - -
L.010 Mandor 0.0080 OH 50,000.00 400.00 50,000.00 400.00 - -
F. PEKERJAAN KAYU

SNI - F.6.8a Pas. Pintu Panil Kayu Bangkir M2 SNIF.6.8a 540,500.00 SN2F.6.8a 541,500.00 SNSF.6.8a 298,000.00
M.005n Papan Bangkir 0.0400 M3 7,700,000.00 308,000.00 7,725,000.00 309,000.00 7,700,000.00 308,000.00
L.008 Pekerja 1.0000 OH 50,000.00 50,000.00 50,000.00 50,000.00 - -
L.002 Tukang Kayu 2.5000 OH 65,000.00 162,500.00 65,000.00 162,500.00 - -
L.007 Kepala Tukang 0.2500 OH 70,000.00 17,500.00 70,000.00 17,500.00 - -
L.010 Mandor 0.0500 OH 50,000.00 2,500.00 50,000.00 2,500.00 - -
Pas. Kaso dan Reng genteng glasur Kayu
M2 SNIF.6.31d 92,250.00 SN2F.6.31d 90,600.00 SNSF.6.31d 79,800.00
Bangkir uk. Khusus
M.005i1 Usuk Bangkir 5/7 (uk. khusus) 0.0120 M3 6,400,000.00 76,800.00 6,400,000.00 76,800.00 6,400,000.00 76,800.00
M.006 Paku Biasa ( 2" - 5") 0.1500 Kg 20,000.00 3,000.00 9,000.00 1,350.00 20,000.00 3,000.00
L.008 Pekerja 0.1000 OH 50,000.00 5,000.00 50,000.00 5,000.00 - -
L.002 Tukang Kayu 0.1000 OH 65,000.00 6,500.00 65,000.00 6,500.00 - -
L.007 Kepala Tukang 0.0100 OH 70,000.00 700.00 70,000.00 700.00 - -
L.010 Mandor 0.0050 OH 50,000.00 250.00 50,000.00 250.00 - -
G. PEKERJAAN BETON

SNI - G.6.1 Membuat Beton Tumbuk 1 PC : 3 Ps : 5 Kr M3 SNIG.6.1 603,695.56 SN2G.6.1 620,800.00 SNSG.6.1 499,195.56
M.002a Portland Cement 218.00 Kg 1,280.00 279,040.00 1,300.00 283,400.00 1,280.00 279,040.00
M.001 Pasir Beton 0.5200 M3 122,222.22 63,555.56 130,000.00 67,600.00 122,222.22 63,555.56
M.001g Koral Beton ( Batu pecah 2/3 cm ) 0.8700 M3 180,000.00 156,600.00 190,000.00 165,300.00 180,000.00 156,600.00
L.008 Pekerja 1.6500 OH 50,000.00 82,500.00 50,000.00 82,500.00 - -
L.001 Tukang Batu 0.2500 OH 65,000.00 16,250.00 65,000.00 16,250.00 - -
L.007 Kepala Tukang 0.0250 OH 70,000.00 1,750.00 70,000.00 1,750.00 - -
24 / 51
PEMERINTAH KABUPATEN BANYUMAS ANALISA HARGA SATUAN PEKERJAAN
DINAS PEKERJAAN UMUM
Jl.Jend. Gatot Subroto No.III-5 Telp.(0281) 637038 TAHUN 2015
KODE KOEFISIE SATU KATAGORI K-I (Mudah) KATAGORI K-II (Sulit) SWAKELOLA
JENIS & URAIAN PEKERJAN
ANALISA N AN HRG SAT(Rp) HARGA (Rp) HRG SAT(Rp) HARGA (Rp) HRG SAT(Rp) HARGA (Rp)
1 2 3 4 6 7=3X6 8 9=3X8 10 11 = 3 X 10
L.010 Mandor 0.0800 OH 50,000.00 4,000.00 50,000.00 4,000.00 - -
Membuat Lantai Kerja Beton Tumbuk 1 PC : 3
SNI - G.6.4 M3 SNIG.6.4 83,137.78 SN2G.6.4 83,980.00 SNSG.6.4 23,897.78
Ps : 5 Kr tb. 5 cm
M.002a Portland Cement 10.0000 Kg 1,280.00 12,800.00 1,300.00 13,000.00 1,280.00 12,800.00
M.001 Pasir Beton 0.0260 M3 122,222.22 3,177.78 130,000.00 3,380.00 122,222.22 3,177.78
M.001g Koral Beton ( Batu pecah 2/3 cm ) 0.0440 M3 180,000.00 7,920.00 190,000.00 8,360.00 180,000.00 7,920.00
L.008 Pekerja 1.1500 OH 50,000.00 57,500.00 50,000.00 57,500.00 - -
L.001 Tukang Batu 0.0200 OH 65,000.00 1,300.00 65,000.00 1,300.00 - -
L.007 Kepala Tukang 0.0020 OH 70,000.00 140.00 70,000.00 140.00 - -
L.010 Mandor 0.0060 OH 50,000.00 300.00 50,000.00 300.00 - -
SNI - G.6.13 Membuat Beton Cor 1 PC : 2 Ps : 3 Kr M3 SNIG.6.13 817,080.00 SN2G.6.13 836,100.00 SNSG.6.13 641,880.00
M.002a Portland Cement 336.00 Kg 1,280.00 430,080.00 1,300.00 436,800.00 1,280.00 430,080.00
M.001 Pasir Beton 0.5400 M3 122,222.22 66,000.00 130,000.00 70,200.00 122,222.22 66,000.00
M.001g Koral Beton ( Batu pecah 2/3 cm ) 0.8100 M3 180,000.00 145,800.00 190,000.00 153,900.00 180,000.00 145,800.00
L.008 Pekerja 2.0000 OH 50,000.00 100,000.00 50,000.00 100,000.00 - -
L.001 Tukang Batu 0.3500 OH 65,000.00 22,750.00 65,000.00 22,750.00 - -
L.007 Kepala Tukang 0.0350 OH 70,000.00 2,450.00 70,000.00 2,450.00 - -
L.010 Mandor 1.0000 OH 50,000.00 50,000.00 50,000.00 50,000.00 - -
SNI - G.6.25 Pembesian dengan Besi Beton Polos Kg SNIG.6.25 13,769.00 SN2G.6.25 14,819.00 SNSG.6.25 12,900.00
M.003 Besi Beton Polos 1.0500 Kg 12,000.00 12,600.00 13,000.00 13,650.00 12,000.00 12,600.00
M.003a Kawat Beton ( Bindrat ) 0.0150 Kg 20,000.00 300.00 20,000.00 300.00 20,000.00 300.00
L.008 Pekerja 0.0070 OH 50,000.00 350.00 50,000.00 350.00 - -
L.003 Tukang Besi 0.0070 OH 65,000.00 455.00 65,000.00 455.00 - -
L.007 Kepala Tukang 0.0007 OH 70,000.00 49.00 70,000.00 49.00 - -
L.010 Mandor 0.0003 OH 50,000.00 15.00 50,000.00 15.00 - -
SNI - G.6.25a Pembesian dengan Besi Beton Ulir Kg SNIG.6.25a 14,819.00 SN2G.6.25a 15,869.00 SNSG.6.25a 13,950.00
M.003c Besi Beton Ulir 1.0500 Kg 13,000.00 13,650.00 14,000.00 14,700.00 13,000.00 13,650.00
M.003a Kawat Beton ( Bindrat ) 0.0150 Kg 20,000.00 300.00 20,000.00 300.00 20,000.00 300.00
L.008 Pekerja 0.0070 OH 50,000.00 350.00 50,000.00 350.00 - -
L.003 Tukang Besi 0.0070 OH 65,000.00 455.00 65,000.00 455.00 - -
L.007 Kepala Tukang 0.0007 OH 70,000.00 49.00 70,000.00 49.00 - -
25 / 51
PEMERINTAH KABUPATEN BANYUMAS ANALISA HARGA SATUAN PEKERJAAN
DINAS PEKERJAAN UMUM
Jl.Jend. Gatot Subroto No.III-5 Telp.(0281) 637038 TAHUN 2015
KODE KOEFISIE SATU KATAGORI K-I (Mudah) KATAGORI K-II (Sulit) SWAKELOLA
JENIS & URAIAN PEKERJAN
ANALISA N AN HRG SAT(Rp) HARGA (Rp) HRG SAT(Rp) HARGA (Rp) HRG SAT(Rp) HARGA (Rp)
1 2 3 4 6 7=3X6 8 9=3X8 10 11 = 3 X 10
L.010 Mandor 0.0003 OH 50,000.00 15.00 50,000.00 15.00 - -
SNI - G.6.28 Pas. Bekisting untuk Pondasi M2 SNIG.6.28 99,970.00 SN2G.6.28 84,670.00 SNSG.6.28 66,000.00
M.005a Kayu Tahun 0.0400 M3 1,500,000.00 60,000.00 1,200,000.00 48,000.00 1,500,000.00 60,000.00
M.006 Paku Biasa (2" - 5") 0.3000 Kg 20,000.00 6,000.00 9,000.00 2,700.00 20,000.00 6,000.00
L.008 Pekerja 0.3000 OH 50,000.00 15,000.00 50,000.00 15,000.00 - -
L.002 Tukang Kayu 0.2600 OH 65,000.00 16,900.00 65,000.00 16,900.00 - -
L.007 Kepala Tukang 0.0260 OH 70,000.00 1,820.00 70,000.00 1,820.00 - -
L.010 Mandor 0.0050 OH 50,000.00 250.00 50,000.00 250.00 - -
SNI - G.6.29 Pas. Bekisting untuk Sloof M2 SNIG.6.29 107,470.00 SN2G.6.29 90,670.00 SNSG.6.29 73,500.00
M.005a Kayu Tahun 0.0450 M3 1,500,000.00 67,500.00 1,200,000.00 54,000.00 1,500,000.00 67,500.00
M.006 Paku Biasa (2" - 5") 0.3000 Kg 20,000.00 6,000.00 9,000.00 2,700.00 20,000.00 6,000.00
L.008 Pekerja 0.3000 OH 50,000.00 15,000.00 50,000.00 15,000.00 - -
L.002 Tukang Kayu 0.2600 OH 65,000.00 16,900.00 65,000.00 16,900.00 - -
L.007 Kepala Tukang 0.0260 OH 70,000.00 1,820.00 70,000.00 1,820.00 - -
L.010 Mandor 0.0050 OH 50,000.00 250.00 50,000.00 250.00 - -
SNI - G.6.30 Pas. Bekisting untuk Kolom (pakai 2x) M2 SNIG.6.30 135,367.50 SN2G.6.30 265,760.00 SNSG.6.30 231,675.00
M.005a Kayu Tahun 0.0400 M3 1,500,000.00 60,000.00 1,200,000.00 48,000.00 1,500,000.00 60,000.00
M.006 Paku Biasa (2" - 5") 0.4000 Kg 20,000.00 8,000.00 9,000.00 3,600.00 20,000.00 8,000.00
M.005g Usuk Meranti 5/7 0.0150 M3 3,645,000.00 54,675.00 3,670,000.00 55,050.00 3,645,000.00 54,675.00
M.009c Multiplek 9mm 0.3500 Lbr 140,000.00 49,000.00 143,000.00 50,050.00 140,000.00 49,000.00
M.005s Dolken kayu galam diam.8-10/4m 2.0000 Btg 30,000.00 60,000.00 35,000.00 70,000.00 30,000.00 60,000.00
L.008 Pekerja 0.3000 OH 50,000.00 15,000.00 50,000.00 15,000.00 - -
L.002 Tukang Kayu 0.3300 OH 65,000.00 21,450.00 65,000.00 21,450.00 - -
L.007 Kepala Tukang 0.0330 OH 70,000.00 2,310.00 70,000.00 2,310.00 - -
L.010 Mandor 0.0060 OH 50,000.00 300.00 50,000.00 300.00 - -
SNI - G.6.31 Pas. Bekisting untuk Balok (pakai 2x) M2 SNIG.6.31 141,335.00 SN2G.6.31 277,770.00 SNSG.6.31 242,610.00
M.005a Kayu Tahun 0.0400 M3 1,500,000.00 60,000.00 1,200,000.00 48,000.00 1,500,000.00 60,000.00
M.006 Paku Biasa (2" - 5") 0.4000 Kg 20,000.00 8,000.00 9,000.00 3,600.00 20,000.00 8,000.00
M.005g Usuk Meranti 5/7 0.0180 M3 3,645,000.00 65,610.00 3,670,000.00 66,060.00 3,645,000.00 65,610.00
M.009c Multiplek 9mm 0.3500 Lbr 140,000.00 49,000.00 143,000.00 50,050.00 140,000.00 49,000.00
26 / 51
PEMERINTAH KABUPATEN BANYUMAS ANALISA HARGA SATUAN PEKERJAAN
DINAS PEKERJAAN UMUM
Jl.Jend. Gatot Subroto No.III-5 Telp.(0281) 637038 TAHUN 2015
KODE KOEFISIE SATU KATAGORI K-I (Mudah) KATAGORI K-II (Sulit) SWAKELOLA
JENIS & URAIAN PEKERJAN
ANALISA N AN HRG SAT(Rp) HARGA (Rp) HRG SAT(Rp) HARGA (Rp) HRG SAT(Rp) HARGA (Rp)
1 2 3 4 6 7=3X6 8 9=3X8 10 11 = 3 X 10
M.005s Dolken kayu galam diam.8-10/4m 2.0000 Btg 30,000.00 60,000.00 35,000.00 70,000.00 30,000.00 60,000.00
L.008 Pekerja 0.3200 OH 50,000.00 16,000.00 50,000.00 16,000.00 - -
L.002 Tukang Kayu 0.3300 OH 65,000.00 21,450.00 65,000.00 21,450.00 - -
L.007 Kepala Tukang 0.0330 OH 70,000.00 2,310.00 70,000.00 2,310.00 - -
L.010 Mandor 0.0060 OH 50,000.00 300.00 50,000.00 300.00 - -
SNI - G.6.32 Pas. Bekisting untuk Lantai (pakai 2x) M2 SNIG.6.32 195,867.50 SN2G.6.32 406,760.00 SNSG.6.32 351,675.00
M.005a Kayu Tahun 0.0400 M3 1,500,000.00 60,000.00 1,200,000.00 48,000.00 1,500,000.00 60,000.00
M.006 Paku Biasa (2" - 5") 0.4000 Kg 20,000.00 8,000.00 9,000.00 3,600.00 20,000.00 8,000.00
M.005g Usuk Meranti 5/7 0.0150 M3 3,645,000.00 54,675.00 3,670,000.00 55,050.00 3,645,000.00 54,675.00
M.009c Multiplek 9mm 0.3500 Lbr 140,000.00 49,000.00 143,000.00 50,050.00 140,000.00 49,000.00
M.005s Dolken kayu galam diam.8-10/4m 6.0000 Btg 30,000.00 180,000.00 35,000.00 210,000.00 30,000.00 180,000.00
L.008 Pekerja 0.3200 OH 50,000.00 16,000.00 50,000.00 16,000.00 - -
L.002 Tukang Kayu 0.3300 OH 65,000.00 21,450.00 65,000.00 21,450.00 - -
L.007 Kepala Tukang 0.0330 OH 70,000.00 2,310.00 70,000.00 2,310.00 - -
L.010 Mandor 0.0060 OH 50,000.00 300.00 50,000.00 300.00 - -
SNI - G.6.33 Pas. Bekisting untuk Dinding M2 SNIG.6.33 374,960.00 SN2G.6.33 380,110.00 SNSG.6.33 334,900.00
M.005a Kayu Tahun 0.0300 M3 1,500,000.00 45,000.00 1,200,000.00 36,000.00 1,500,000.00 45,000.00
M.006 Paku Biasa (2" - 5") 0.4000 Kg 20,000.00 8,000.00 9,000.00 3,600.00 20,000.00 8,000.00
M.005g Usuk Meranti 5/7 0.0200 M3 3,645,000.00 72,900.00 3,670,000.00 73,400.00 3,645,000.00 72,900.00
M.009c Multiplek 9mm 0.3500 Lbr 140,000.00 49,000.00 143,000.00 50,050.00 140,000.00 49,000.00
M.005s Dolken kayu galam diam.8-10/4m 3.0000 Btg 30,000.00 90,000.00 35,000.00 105,000.00 30,000.00 90,000.00
M.005t Formite/Penjaga Jarak Bekisting/Spacer 4.0000 Btg 17,500.00 70,000.00 18,000.00 72,000.00 17,500.00 70,000.00
L.008 Pekerja 0.3200 OH 50,000.00 16,000.00 50,000.00 16,000.00 - -
L.002 Tukang Kayu 0.3300 OH 65,000.00 21,450.00 65,000.00 21,450.00 - -
L.007 Kepala Tukang 0.0330 OH 70,000.00 2,310.00 70,000.00 2,310.00 - -
L.010 Mandor 0.0060 OH 50,000.00 300.00 50,000.00 300.00 - -
SNI - G.6.34 Pas. Bekisting untuk Tangga M2 SNIG.6.34 256,735.00 SN2G.6.34 254,760.00 SNSG.6.34 216,675.00
M.005a Kayu Tahun 0.0300 M3 1,500,000.00 45,000.00 1,200,000.00 36,000.00 1,500,000.00 45,000.00
M.006 Paku Biasa (2" - 5") 0.4000 Kg 20,000.00 8,000.00 9,000.00 3,600.00 20,000.00 8,000.00
M.005g Kayu Meranti ( Balok ) 0.0150 M3 3,645,000.00 54,675.00 3,670,000.00 55,050.00 3,645,000.00 54,675.00
M.009c Plywood 9mm 0.3500 Lbr 140,000.00 49,000.00 143,000.00 50,050.00 140,000.00 49,000.00
27 / 51
PEMERINTAH KABUPATEN BANYUMAS ANALISA HARGA SATUAN PEKERJAAN
DINAS PEKERJAAN UMUM
Jl.Jend. Gatot Subroto No.III-5 Telp.(0281) 637038 TAHUN 2015
KODE KOEFISIE SATU KATAGORI K-I (Mudah) KATAGORI K-II (Sulit) SWAKELOLA
JENIS & URAIAN PEKERJAN
ANALISA N AN HRG SAT(Rp) HARGA (Rp) HRG SAT(Rp) HARGA (Rp) HRG SAT(Rp) HARGA (Rp)
1 2 3 4 6 7=3X6 8 9=3X8 10 11 = 3 X 10
M.005s Dolken kayu galam diam.8-10/4m 2.0000 Btg 30,000.00 60,000.00 35,000.00 70,000.00 30,000.00 60,000.00
L.008 Pekerja 0.3200 OH 50,000.00 16,000.00 50,000.00 16,000.00 - -
L.002 Tukang Kayu 0.3300 OH 65,000.00 21,450.00 65,000.00 21,450.00 - -
L.007 Kepala Tukang 0.0330 OH 70,000.00 2,310.00 70,000.00 2,310.00 - -
L.010 Mandor 0.0060 OH 50,000.00 300.00 50,000.00 300.00 - -

H. PEKERJAAN ATAP

SNI - H.6.30a 1 M2 Pas. Atap Genteng Morando kebumen M2 SNIH.6.30a 90,300.00 SN2H.6.30a 67,470.00 SNSH.6.30a 50,100.00
M.010e Genteng Glasur Natural Morando 18.0000 Bh 4,000.00 72,000.00 2,750.00 49,500.00 2,750.00 49,500.00
M.006 Paku Biasa ( 2" - 5") 0.0300 Kg 20,000.00 600.00 9,000.00 270.00 20,000.00 600.00
L.008 Pekerja 0.2000 OH 50,000.00 10,000.00 50,000.00 10,000.00 - -
L.002 Tukang Kayu 0.1000 OH 65,000.00 6,500.00 65,000.00 6,500.00 - -
L.007 Kepala Tukang 0.0100 OH 70,000.00 700.00 70,000.00 700.00 - -
L.010 Mandor 0.0100 OH 50,000.00 500.00 50,000.00 500.00 - -
SNI - H.6.34a Pas. Atap Nok Genteng Glasur Natural M' SNIH.6.34a 123,135.11 SN2H.6.34a 77,175.00 SNSH.6.34a 37,860.11
M.010f Genteng Nok 3.5000 Bh 18,000.00 63,000.00 3,750.00 13,125.00 3,750.00 13,125.00
M.006 Paku Biasa ( 2" - 5") 0.0500 Kg 20,000.00 1,000.00 9,000.00 450.00 20,000.00 1,000.00
M.002a Portland Cement 10.8000 Kg 1,280.00 13,824.00 1,300.00 14,040.00 1,280.00 13,824.00
M.001a Pasir Pasang 0.0320 M3 122,222.22 3,911.11 130,000.00 4,160.00 122,222.22 3,911.11
M.002b PC Warna 1.0000 Kg 6,000.00 6,000.00 10,000.00 10,000.00 6,000.00 6,000.00
L.008 Pekerja 0.4000 OH 50,000.00 20,000.00 50,000.00 20,000.00 - -
L.002 Tukang Kayu 0.2000 OH 65,000.00 13,000.00 65,000.00 13,000.00 - -
L.007 Kepala Tukang 0.0200 OH 70,000.00 1,400.00 70,000.00 1,400.00 - -
L.010 Mandor 0.0200 OH 50,000.00 1,000.00 50,000.00 1,000.00 - -
J. PEKERJAAN SANITASI

SNI - J.6.1 Pasang Kloset Duduk / Monoblok BH SNIJ.6.1 1,516,570.00 SN2J.6.1 1,755,070.00 SNSJ.6.1 1,484,000.00
M.015 Kloset duduk / Monoblok 1.0000 Bh 1,200,000.00 1,200,000.00 1,425,000.00 1,425,000.00 1,400,000.00 1,400,000.00
- Perlengkapan 6% x hrg kloset 72,000.00 72,000.00 85,500.00 85,500.00 84,000.00 84,000.00
28 / 51
PEMERINTAH KABUPATEN BANYUMAS ANALISA HARGA SATUAN PEKERJAAN
DINAS PEKERJAAN UMUM
Jl.Jend. Gatot Subroto No.III-5 Telp.(0281) 637038 TAHUN 2015
KODE KOEFISIE SATU KATAGORI K-I (Mudah) KATAGORI K-II (Sulit) SWAKELOLA
JENIS & URAIAN PEKERJAN
ANALISA N AN HRG SAT(Rp) HARGA (Rp) HRG SAT(Rp) HARGA (Rp) HRG SAT(Rp) HARGA (Rp)
1 2 3 4 6 7=3X6 8 9=3X8 10 11 = 3 X 10
L.008 Pekerja 3.3000 OH 50,000.00 165,000.00 50,000.00 165,000.00 - -
L.001 Tukang Batu 1.1000 OH 65,000.00 71,500.00 65,000.00 71,500.00 - -
L.007 Kepala Tukang 0.0010 OH 70,000.00 70.00 70,000.00 70.00 - -
L.010 Mandor 0.1600 OH 50,000.00 8,000.00 50,000.00 8,000.00 - -
SNI - J.6.2 Pasang Kloset Jongkok Porselen BH SNIJ.6.2 344,402.22 SN2J.6.2 424,600.00 SNSJ.6.2 158,902.22
M.015a Kloset Jongkok Porselen 1.0000 Bh 75,000.00 75,000.00 155,000.00 155,000.00 150,000.00 150,000.00
M.002a Portland Cement 6.0000 Kg 1,280.00 7,680.00 1,300.00 7,800.00 1,280.00 7,680.00
M.001a Pasir Pasang 0.0100 M3 122,222.22 1,222.22 130,000.00 1,300.00 122,222.22 1,222.22
L.008 Pekerja 1.0000 OH 50,000.00 50,000.00 50,000.00 50,000.00 - -
L.001 Tukang Batu 1.5000 OH 65,000.00 97,500.00 65,000.00 97,500.00 - -
L.007 Kepala Tukang 1.5000 OH 70,000.00 105,000.00 70,000.00 105,000.00 - -
L.010 Mandor 0.1600 OH 50,000.00 8,000.00 50,000.00 8,000.00 - -
SNI - J.6.5 Pasang Wastafel BH SNIJ.6.5 402,652.22 SN2J.6.5 716,450.00 SNSJ.6.5 540,902.22
M.015c Wastafel 1.0000 Bh 200,000.00 200,000.00 480,000.00 480,000.00 475,000.00 475,000.00
- Perlengkapan 12% x hrg Wastafel 24,000.00 24,000.00 57,600.00 57,600.00 57,000.00 57,000.00
M.002a Portland Cement 6.0000 Kg 1,280.00 7,680.00 1,300.00 7,800.00 1,280.00 7,680.00
M.001a Pasir Pasang 0.0100 M3 122,222.22 1,222.22 130,000.00 1,300.00 122,222.22 1,222.22
L.008 Pekerja 1.2000 OH 50,000.00 60,000.00 50,000.00 60,000.00 - -
L.001 Tukang Batu 1.4500 OH 65,000.00 94,250.00 65,000.00 94,250.00 - -
L.007 Kepala Tukang 0.1500 OH 70,000.00 10,500.00 70,000.00 10,500.00 - -
L.010 Mandor 0.1000 OH 50,000.00 5,000.00 50,000.00 5,000.00 - -
Pasang Bak Kontrol Pasang Batu Bata Uk.
SNI - J.6.17 BH SNIJ.6.17 313,808.89 SN2J.6.17 327,822.50 SNSJ.6.17 205,223.89
(45x45) cm tinggi 50 cm
M.001m Batu Bata 0.2500 M3 191,100.00 47,775.00 222,950.00 55,737.50 191,100.00 47,775.00
M.002a Portland Cement 77.00 Kg 1,280.00 98,560.00 1,300.00 100,100.00 1,280.00 98,560.00
M.001a Pasir Pasang 0.1300 M3 122,222.22 15,888.89 130,000.00 16,900.00 122,222.22 15,888.89
M.001n Batu Kerikil 0.0200 M3 40,000.00 800.00 50,000.00 1,000.00 40,000.00 800.00
M.003 Besi Beton 2.6000 Kg 12,000.00 31,200.00 13,000.00 33,800.00 12,000.00 31,200.00
M.001 Pasir Beton 0.0900 M3 122,222.22 11,000.00 130,000.00 11,700.00 122,222.22 11,000.00
L.008 Pekerja 1.4200 OH 50,000.00 71,000.00 50,000.00 71,000.00 - -
L.001 Tukang Batu 0.4730 OH 65,000.00 30,745.00 65,000.00 30,745.00 - -
L.007 Kepala Tukang 0.0470 OH 70,000.00 3,290.00 70,000.00 3,290.00 - -
29 / 51
PEMERINTAH KABUPATEN BANYUMAS ANALISA HARGA SATUAN PEKERJAAN
DINAS PEKERJAAN UMUM
Jl.Jend. Gatot Subroto No.III-5 Telp.(0281) 637038 TAHUN 2015
KODE KOEFISIE SATU KATAGORI K-I (Mudah) KATAGORI K-II (Sulit) SWAKELOLA
JENIS & URAIAN PEKERJAN
ANALISA N AN HRG SAT(Rp) HARGA (Rp) HRG SAT(Rp) HARGA (Rp) HRG SAT(Rp) HARGA (Rp)
1 2 3 4 6 7=3X6 8 9=3X8 10 11 = 3 X 10
L.010 Mandor 0.0710 OH 50,000.00 3,550.00 50,000.00 3,550.00 - -
SNI - J.6.25 Pasang Pipa PVC diameter 1/2" type AW M' SNIJ.6.25 10,550.00 SN2J.6.25 10,860.00 SNSJ.6.25 4,340.00
M.016g Pipa PVC 1/2" 1.2000 M' 2,800.00 3,360.00 3,000.00 3,600.00 2,800.00 3,360.00
- Perlengkapan 35% x hrg pipa 980.00 980.00 1,050.00 1,050.00 980.00 980.00
L.008 Pekerja 0.0360 OH 50,000.00 1,800.00 50,000.00 1,800.00 - -
L.001 Tukang Batu 0.0600 OH 65,000.00 3,900.00 65,000.00 3,900.00 - -
L.007 Kepala Tukang 0.0060 OH 70,000.00 420.00 70,000.00 420.00 - -
L.010 Mandor 0.0018 OH 50,000.00 90.00 50,000.00 90.00 - -
SNI - J.6.26 Pasang Pipa PVC diameter 3/4" type AW M' SNIJ.6.26 12,410.00 SN2J.6.26 13,185.00 SNSJ.6.26 6,200.00
M.016h Pipa PVC diam. 3/4" 1.2000 M' 4,000.00 4,800.00 4,500.00 5,400.00 4,000.00 4,800.00
- Perlengkapan 35% x hrg pipa 1,400.00 1,400.00 1,575.00 1,575.00 1,400.00 1,400.00
L.008 Pekerja 0.0360 OH 50,000.00 1,800.00 50,000.00 1,800.00 - -
L.001 Tukang Batu 0.0600 OH 65,000.00 3,900.00 65,000.00 3,900.00 - -
L.007 Kepala Tukang 0.0060 OH 70,000.00 420.00 70,000.00 420.00 - -
L.010 Mandor 0.0018 OH 50,000.00 90.00 50,000.00 90.00 - -
SNI - J.6.27 Pasang Pipa PVC diameter 1" type AW M' SNIJ.6.27 13,960.00 SN2J.6.27 15,510.00 SNSJ.6.27 7,750.00
M.016i Pipa PVC diam. 1" 1.2000 M' 5,000.00 6,000.00 6,000.00 7,200.00 5,000.00 6,000.00
- Perlengkapan 35% x hrg pipa 1,750.00 1,750.00 2,100.00 2,100.00 1,750.00 1,750.00
L.008 Pekerja 0.0360 OH 50,000.00 1,800.00 50,000.00 1,800.00 - -
L.001 Tukang Batu 0.0600 OH 65,000.00 3,900.00 65,000.00 3,900.00 - -
L.007 Kepala Tukang 0.0060 OH 70,000.00 420.00 70,000.00 420.00 - -
L.010 Mandor 0.0018 OH 50,000.00 90.00 50,000.00 90.00 - -
SNI - J.6.29 Pasang Pipa PVC diameter 2" type AW M' SNIJ.6.29 29,465.00 SN2J.6.29 31,015.00 SNSJ.6.29 20,150.00
M.016k Pipa PVC diam. 2" 1.2000 M' 13,000.00 15,600.00 14,000.00 16,800.00 13,000.00 15,600.00
- Perlengkapan 35% x hrg pipa 4,550.00 4,550.00 4,900.00 4,900.00 4,550.00 4,550.00
L.008 Pekerja 0.0540 OH 50,000.00 2,700.00 50,000.00 2,700.00 - -
L.001 Tukang Batu 0.0900 OH 65,000.00 5,850.00 65,000.00 5,850.00 - -
L.007 Kepala Tukang 0.0090 OH 70,000.00 630.00 70,000.00 630.00 - -
L.010 Mandor 0.0027 OH 50,000.00 135.00 50,000.00 135.00 - -
30 / 51
PEMERINTAH KABUPATEN BANYUMAS ANALISA HARGA SATUAN PEKERJAAN
DINAS PEKERJAAN UMUM
Jl.Jend. Gatot Subroto No.III-5 Telp.(0281) 637038 TAHUN 2015
KODE KOEFISIE SATU KATAGORI K-I (Mudah) KATAGORI K-II (Sulit) SWAKELOLA
JENIS & URAIAN PEKERJAN
ANALISA N AN HRG SAT(Rp) HARGA (Rp) HRG SAT(Rp) HARGA (Rp) HRG SAT(Rp) HARGA (Rp)
1 2 3 4 6 7=3X6 8 9=3X8 10 11 = 3 X 10
SNI - J.6.31 Pasang Pipa PVC diameter 3" type AW M' SNIJ.6.31 51,165.00 SN2J.6.31 52,715.00 SNSJ.6.31 41,850.00
M.016l Pipa PVC diam. 3" 1.2000 M' 27,000.00 32,400.00 28,000.00 33,600.00 27,000.00 32,400.00
- Perlengkapan 35% x hrg pipa 9,450.00 9,450.00 9,800.00 9,800.00 9,450.00 9,450.00
L.008 Pekerja 0.0540 OH 50,000.00 2,700.00 50,000.00 2,700.00 - -
L.001 Tukang Batu 0.0900 OH 65,000.00 5,850.00 65,000.00 5,850.00 - -
L.007 Kepala Tukang 0.0090 OH 70,000.00 630.00 70,000.00 630.00 - -
L.010 Mandor 0.0027 OH 50,000.00 135.00 50,000.00 135.00 - -
SNI - J.6.32 Memasang 1 m' Pipa PVC diameter 4" type AW M' SNIJ.6.32 83,725.00 SN2J.6.32 85,275.00 SNSJ.6.32 69,750.00
M.016m Pipa PVC diam. 4" 1.2000 M' 45,000.00 54,000.00 46,000.00 55,200.00 45,000.00 54,000.00
- Perlengkapan 35% x hrg pipa 15,750.00 15,750.00 16,100.00 16,100.00 15,750.00 15,750.00
L.008 Pekerja 0.0810 OH 50,000.00 4,050.00 50,000.00 4,050.00 - -
L.001 Tukang Batu 0.1350 OH 65,000.00 8,775.00 65,000.00 8,775.00 - -
L.007 Kepala Tukang 0.0135 OH 70,000.00 945.00 70,000.00 945.00 - -
L.010 Mandor 0.0041 OH 50,000.00 205.00 50,000.00 205.00 - -
Memasang 1 Buah Bak Cuci Piring Stainless
SNI - J.6.33 BH SNIJ.6.33 258,175.00 SN2J.6.33 267,175.00 SNSJ.6.33 235,000.00
Steel
M.015f Bak Cuci piring Stainless stell 1.0000 Bh 206,000.00 206,000.00 215,000.00 215,000.00 206,000.00 206,000.00
M.015g Water drain + Asesories 1.0000 Set 29,000.00 29,000.00 29,000.00 29,000.00 29,000.00 29,000.00
L.008 Pekerja 0.0300 OH 50,000.00 1,500.00 50,000.00 1,500.00 - -
L.001 Tukang Batu 0.3000 OH 65,000.00 19,500.00 65,000.00 19,500.00 - -
L.007 Kepala Tukang 0.0300 OH 70,000.00 2,100.00 70,000.00 2,100.00 - -
L.010 Mandor 0.0015 OH 50,000.00 75.00 50,000.00 75.00 - -
SNI - J.6.35a Memasang 1 Buah Kran diameter 1/2" BH SNIJ.6.35a 68,000.00 SN2J.6.35a 23,000.00 SNSJ.6.35a 60,050.00
M.015h.1 Kran air 1/2" 1.0000 Bh 60,000.00 60,000.00 15,000.00 15,000.00 60,000.00 60,000.00
M.015i Seal tape 0.0250 Bh 2,000.00 50.00 2,000.00 50.00 2,000.00 50.00
L.008 Pekerja 0.0100 OH 50,000.00 500.00 50,000.00 500.00 - -
L.001 Tukang Batu 0.1000 OH 65,000.00 6,500.00 65,000.00 6,500.00 - -
L.007 Kepala Tukang 0.0100 OH 70,000.00 700.00 70,000.00 700.00 - -
L.010 Mandor 0.0050 OH 50,000.00 250.00 50,000.00 250.00 - -
SNI - J.6.36 Memasang 1 Buah Floor Drain BH SNIJ.6.36 26,950.00 SN2J.6.36 27,950.00 SNSJ.6.36 19,000.00
31 / 51
PEMERINTAH KABUPATEN BANYUMAS ANALISA HARGA SATUAN PEKERJAAN
DINAS PEKERJAAN UMUM
Jl.Jend. Gatot Subroto No.III-5 Telp.(0281) 637038 TAHUN 2015
KODE KOEFISIE SATU KATAGORI K-I (Mudah) KATAGORI K-II (Sulit) SWAKELOLA
JENIS & URAIAN PEKERJAN
ANALISA N AN HRG SAT(Rp) HARGA (Rp) HRG SAT(Rp) HARGA (Rp) HRG SAT(Rp) HARGA (Rp)
1 2 3 4 6 7=3X6 8 9=3X8 10 11 = 3 X 10
M.015j Floor Drain 1.0000 Bh 19,000.00 19,000.00 20,000.00 20,000.00 19,000.00 19,000.00
L.008 Pekerja 0.0100 OH 50,000.00 500.00 50,000.00 500.00 - -
L.001 Tukang Batu 0.1000 OH 65,000.00 6,500.00 65,000.00 6,500.00 - -
L.007 Kepala Tukang 0.0100 OH 70,000.00 700.00 70,000.00 700.00 - -
L.010 Mandor 0.0050 OH 50,000.00 250.00 50,000.00 250.00 - -
L. PEKERJAAN LANTAI

SNI - L.6.47b Pas. Lantai Keramik uk. ( 40 x 40 ) cm KW.I M2 SNIL.6.47b 138,899.73 SN2L.6.47b 144,516.50 SNSL.6.47b 66,199.73
M.004d Ubin Keramik 40 x 40 cm KW.I 6.2500 Bh 8,400.00 52,500.00 8,250.00 51,562.50 6,000.00 37,500.00
M.002a Portland Cement 11.3800 Kg 1,280.00 14,566.40 1,300.00 14,794.00 1,280.00 14,566.40
M.001a Pasir Pasang 0.0420 M3 122,222.22 5,133.33 130,000.00 5,460.00 122,222.22 5,133.33
M.002b Semen Warna 1.5000 Kg 6,000.00 9,000.00 10,000.00 15,000.00 6,000.00 9,000.00
L.008 Pekerja 0.6200 OH 50,000.00 31,000.00 50,000.00 31,000.00 - -
L.001 Tukang Batu 0.3500 OH 65,000.00 22,750.00 65,000.00 22,750.00 - -
L.007 Kepala Tukang 0.0350 OH 70,000.00 2,450.00 70,000.00 2,450.00 - -
L.010 Mandor 0.0300 OH 50,000.00 1,500.00 50,000.00 1,500.00 - -
Pas. Lantai Keramik Anti Slip uk. ( 40 x 40 ) cm
SNI - L.6.48b M2 SNIL.6.48b 143,399.73 SN2L.6.48b 181,754.00 SNSL.6.48b 95,299.73
KW.I
M.004j Keramik Lantai 30x30 cm Anti Slip KW.I 11.1000 Bh 5,135.14 57,000.00 8,000.00 88,800.00 6,000.00 66,600.00
M.002a Portland Cement 11.3800 Kg 1,280.00 14,566.40 1,300.00 14,794.00 1,280.00 14,566.40
M.001a Pasir Pasang 0.0420 M3 122,222.22 5,133.33 130,000.00 5,460.00 122,222.22 5,133.33
M.002b Semen Warna 1.5000 Kg 6,000.00 9,000.00 10,000.00 15,000.00 6,000.00 9,000.00
L.008 Pekerja 0.6200 OH 50,000.00 31,000.00 50,000.00 31,000.00 - -
L.001 Tukang Batu 0.3500 OH 65,000.00 22,750.00 65,000.00 22,750.00 - -
L.007 Kepala Tukang 0.0350 OH 70,000.00 2,450.00 70,000.00 2,450.00 - -
L.010 Mandor 0.0300 OH 50,000.00 1,500.00 50,000.00 1,500.00 - -
SNI - L.6.68 Pas. Dinding Keramik uk. ( 20 x 40 ) cm KW.I M2 SNIL.6.68 130,254.00 SN2L.6.68 81,580.00 SNSL.6.68 32,729.00
M.004n Dinding Keramik 20 x 40 cm KW.I 5.5000 Bh 12,000.00 66,000.00 2,000.00 11,000.00 1,750.00 9,625.00
M.002a Portland Cement 9.3000 Kg 1,280.00 11,904.00 1,300.00 12,090.00 1,280.00 11,904.00
M.001a Pasir Pasang 0.0180 M3 122,222.22 2,200.00 130,000.00 2,340.00 122,222.22 2,200.00
M.002b Semen Warna 1.5000 Kg 6,000.00 9,000.00 10,000.00 15,000.00 6,000.00 9,000.00
L.008 Pekerja 0.6000 OH 50,000.00 30,000.00 50,000.00 30,000.00 - -
L.001 Tukang Batu 0.1000 OH 65,000.00 6,500.00 65,000.00 6,500.00 - -
32 / 51
PEMERINTAH KABUPATEN BANYUMAS ANALISA HARGA SATUAN PEKERJAAN
DINAS PEKERJAAN UMUM
Jl.Jend. Gatot Subroto No.III-5 Telp.(0281) 637038 TAHUN 2015
KODE KOEFISIE SATU KATAGORI K-I (Mudah) KATAGORI K-II (Sulit) SWAKELOLA
JENIS & URAIAN PEKERJAN
ANALISA N AN HRG SAT(Rp) HARGA (Rp) HRG SAT(Rp) HARGA (Rp) HRG SAT(Rp) HARGA (Rp)
1 2 3 4 6 7=3X6 8 9=3X8 10 11 = 3 X 10
L.007 Kepala Tukang 0.0450 OH 70,000.00 3,150.00 70,000.00 3,150.00 - -
L.010 Mandor 0.0300 OH 50,000.00 1,500.00 50,000.00 1,500.00 - -
M. PEKERJAAN PENGECATAN
Pengecatan Tembok Baru( 1 lps plamir, 1 lps cat
SNI - M.6.14a dasar, 2 lps cat penutup ) Sek. Dulux untuk M2 SNIM.6.14a 38,811.00 SN2M.6.14a 27,651.00 SNSM.6.14a 33,150.00
Exterior
M.012a Plamir Tembok 0.1000 Kg 7,500.00 750.00 7,500.00 750.00 7,500.00 750.00
M.011a.1 Cat dasar ( sek. Dulux ) 0.1000 Kg 90,000.00 9,000.00 59,000.00 5,900.00 90,000.00 9,000.00
M.011a.1 Cat Penutup 2 kali ( sek. Dulux ) 0.2600 Kg 90,000.00 23,400.00 59,000.00 15,340.00 90,000.00 23,400.00
L.008 Pekerja 0.0200 OH 50,000.00 1,000.00 50,000.00 1,000.00 - -
L.004 Tukang Cat 0.0630 OH 65,000.00 4,095.00 65,000.00 4,095.00 - -
L.007 Kepala Tukang 0.0063 OH 70,000.00 441.00 70,000.00 441.00 - -
L.010 Mandor 0.0025 OH 50,000.00 125.00 50,000.00 125.00 - -

ANALISA BOW
A. PEKERJAAN PAVING
BOW - KPU.
Pasang Paving Blok Natural M2 BKPU. IVa 122,622.22 KPU2.4a 80,400.00 KPUS.4a 72,222.22
IVa
M.013 Paving Blok Natural 6 cm 1.0000 M2 75,000.00 75,000.00 32,000.00 32,000.00 60,000.00 60,000.00
M.001a Pasir Pasang 0.1000 M3 122,222.22 12,222.22 130,000.00 13,000.00 122,222.22 12,222.22
L.001 Tukang Batu 0.2000 OH 65,000.00 13,000.00 65,000.00 13,000.00 - -
L.007 Kepala Tukang 0.0200 OH 70,000.00 1,400.00 70,000.00 1,400.00 - -
L.008 Pekerja 0.4000 OH 50,000.00 20,000.00 50,000.00 20,000.00 - -
L.010 Mandor 0.0200 OH 50,000.00 1,000.00 50,000.00 1,000.00 - -
B. PEKERJAAN KAP BESI

BOW - I.a Pekerjaan Kap Besi Kg BOW.Ia 24,550.00 BOW2.Ia 23,450.00 BOWS.Ia 12,100.00
M.003b Besi Siku/Propil 1.1000 Kg 11,000.00 12,100.00 10,000.00 11,000.00 11,000.00 12,100.00
L.003 Tukang Besi 0.0900 OH 65,000.00 5,850.00 65,000.00 5,850.00 - -
L.007 Kepala Tukang 0.0300 OH 70,000.00 2,100.00 70,000.00 2,100.00 - -
L.008 Pekerja 0.0900 OH 50,000.00 4,500.00 50,000.00 4,500.00 - -
33 / 51
PEMERINTAH KABUPATEN BANYUMAS ANALISA HARGA SATUAN PEKERJAAN
DINAS PEKERJAAN UMUM
Jl.Jend. Gatot Subroto No.III-5 Telp.(0281) 637038 TAHUN 2015
KODE KOEFISIE SATU KATAGORI K-I (Mudah) KATAGORI K-II (Sulit) SWAKELOLA
JENIS & URAIAN PEKERJAN
ANALISA N AN HRG SAT(Rp) HARGA (Rp) HRG SAT(Rp) HARGA (Rp) HRG SAT(Rp) HARGA (Rp)
1 2 3 4 6 7=3X6 8 9=3X8 10 11 = 3 X 10
D. PEKERJAAN PENGECATAN
BOW -
Pengecatan plapond 3x ( sek. Catylac ) M2 BOWK.623 26,863.50 BOW2K.623 25,663.50 BOWSK.623 6,800.00
K.6+23
M.011b Cat Tembok ( sek. Catylac ) 0.4000 Kg 17,000.00 6,800.00 14,000.00 5,600.00 17,000.00 6,800.00
L.004 Tukang Cat 0.1875 OH 65,000.00 12,187.50 65,000.00 12,187.50 - -
L.007 Kepala Tukang 0.0188 OH 70,000.00 1,316.00 70,000.00 1,316.00 - -
L.008 Pekerja 0.1250 OH 50,000.00 6,250.00 50,000.00 6,250.00 - -
L.010 Mandor 0.0062 OH 50,000.00 310.00 50,000.00 310.00 - -
E. PEKERJAAN BETON
BOW-
Pasang Tegel Batu Candi M2 B.Sup.4h 220,008.05 B2.Sup.4h 225,696.05 BS.Sup.4h 164,695.55
Supl.IV.h
120,000.00 Batu Candi 1.0000 M2 120,000.00 120,000.00 125,000.00 125,000.00 120,000.00 120,000.00
BOW-G.13 Perekat G.13 0.0300 M3 1,204,851.56 36,145.55 1,227,785.00 36,833.55 1,204,851.56 36,145.55
19,000.00 Cairan coating 0.4500 Ltr 19,000.00 8,550.00 19,000.00 8,550.00 19,000.00 8,550.00
BOW-G.69 Upah Pasang G.69 1.2500 M3 44,250.00 55,312.50 44,250.00 55,312.50 - -
Pembuatan Septictank 1 x 1 x 2 m
Ls.08 UNIT Ls.08 5,952,064.18 Ls2.08 6,105,154.00 LsS.08 4,391,336.18
+ Peresapan
SNI-B.6.2 Galian Tanah Biasa Sedalam 2 M 10.00 m3 28,900.00 289,000.00 28,900.00 289,000.00 - -
SNI-B.6.9 Urugan Kembali 2.50 m3 10,550.00 26,375.00 10,550.00 26,375.00 - -
SNI-B.6.11 Urugan Pasir 1.50 m3 162,166.67 243,250.00 171,500.00 257,250.00 146,666.67 220,000.00
SNI-C.6.14 Pas. Pondasi Batu Kosong 0.60 m3 273,696.67 164,218.00 288,030.00 172,818.00 204,666.67 122,800.00
SNI-D.6.3 Pas. Batu Merah tb.1 bata 1Pc:3Ps 6.00 m2 185,698.22 1,114,189.33 194,065.00 1,164,390.00 137,298.22 823,789.33
SNI-D.6.10 Pas. Batu Merah tb.1/2 bata 1Pc:3Ps 3.00 m2 89,232.49 267,697.47 93,331.00 279,993.00 65,282.49 195,847.47
SNI-E.6.3 Plesteran 1Pc:3Ps tb.1,5 cm 10.00 m2 31,916.62 319,166.22 32,194.00 321,940.00 10,616.62 106,166.22
SNI-G.6.13 Membuat Beton Cor 1Pc:2Ps:3Kr 0.22 m3 817,080.00 179,757.60 836,100.00 183,942.00 641,880.00 141,213.60
SNI-G.6.25 Pembesian dengan Besi Beton Polos 16.50 kg 13,769.00 227,188.50 14,819.00 244,513.50 12,900.00 212,850.00
BOW-F.8 Cetakan Kayu Tahun 4.00 m2 134,500.00 538,000.00 118,100.00 472,400.00 68,000.00 272,000.00
SNI-J.6.32 Pasang Pipa PVC diam. 4" type AW 8.00 m' 83,725.00 669,800.00 85,275.00 682,200.00 69,750.00 558,000.00
SNI-J.6.31 Pasang Pipa PVC diam. 3" type AW 10.00 m' 51,165.00 511,650.00 52,715.00 527,150.00 41,850.00 418,500.00
SNI-J.6.22 Pasang Pipa Galvanis diam. 1 1/2" med. B 3.00 m' 63,580.00 190,740.00 66,680.00 200,040.00 44,950.00 134,850.00
Ls Kenie T 1.00 bh 7,500.00 7,500.00 7,500.00 7,500.00 7,500.00 7,500.00
M.001f3 Batu pecah 5/7 cm 2.60 m3 160,000.00 416,000.00 170,000.00 442,000.00 160,000.00 416,000.00
34 / 51
PEMERINTAH KABUPATEN BANYUMAS ANALISA HARGA SATUAN PEKERJAAN
DINAS PEKERJAAN UMUM
Jl.Jend. Gatot Subroto No.III-5 Telp.(0281) 637038 TAHUN 2015
KODE KOEFISIE SATU KATAGORI K-I (Mudah) KATAGORI K-II (Sulit) SWAKELOLA
JENIS & URAIAN PEKERJAN
ANALISA N AN HRG SAT(Rp) HARGA (Rp) HRG SAT(Rp) HARGA (Rp) HRG SAT(Rp) HARGA (Rp)
1 2 3 4 6 7=3X6 8 9=3X8 10 11 = 3 X 10
Ls Krosok 2.50 m3 45,000.00 112,500.00 45,000.00 112,500.00 45,000.00 112,500.00
SNI-B.6.14 Pemasangan Lapisan Ijuk 1.85 m3 332,250.00 614,662.50 356,250.00 659,062.50 324,000.00 599,400.00
SNI-G.6.1 Membuat Beton Tumbuk 1Pc:3Ps:5Kr 0.10 m3 603,695.56 60,369.56 620,800.00 62,080.00 499,195.56 49,919.56
PEMERINTAH KABUPATEN BANYUMAS
DINAS PEKERJAAN UMUM KAB. BANYUMAS
DAFTAR HARGA SATUAN PEKERJAAN
Jl.Jend. Gatot Subroto No.III-5 Telp.(0281) 637038
PURWOKERTO HSP
TAHUN 2007
HRG SATUAN (Rp)
NO KODE ANALIS SATUAN JENIS PEKERJAAN KATAGORI I KATAGORI II
SWAKELOLA
(Mudah) (Sulit)
A. PEKERJAAN PERSIAPAN
1 SNI - A.6.4 M' Pengukuran & Pas.Bouwplank Kayu Meranti 86,515.00 86,815.00 74,065.00
2 SNI - A.6.4a M' Pengukuran & Pas.Bouwplank Kayu Tahun 41,350.00 35,430.00 28,900.00
3 SNI - A.6.6 M2 Pemb.Gudang Semen & Alat-alat Ky.Meranti 1,232,856.67 1,245,750.00 1,036,356.67
4 SNI - A.6.6a M2 Pemb.Gudang Semen & Alat-alat Ky.Tahun 650,106.67 594,750.00 453,606.67
5 SNI - A.6.7 M2 Pemb. Rumah Jaga / Konstruksi Kayu Meranti 1,499,900.00 1,515,600.00 1,339,400.00
6 SNI - A.6.7a M2 Pemb. Rumah Jaga / Konstruksi Kayu Tahun 734,000.00 660,000.00 573,500.00
7 SNI - A.6.8 M2 Membersihkan Lapangan dan Perataan 7,500.00 7,500.00 -
8 SNI - A.6.10 Bh Pemb. Bak Adukan Uk.(40x50x20)cm Ky.Tahun 92,675.00 81,495.00 73,100.00
9 SNI - A.6.11 M2 Pembuatan Steger dari Bambu 23,270.00 23,895.00 8,875.00
10 SNI - A.6.13 M3 Bongkaran Beton Bertulang 350,000.00 350,000.00 -
11 SNI - A.6.14 M3 Bongkaran Dinding Tembok Bt.Merah 335,000.00 335,000.00 -

B. PEKERJAAN TANAH
1 SNI - B.6.1 M3 Galian Tanah Biasa Sedalam 1 M 22,000.00 22,000.00 -
2 SNI - B.6.2 M3 Galian Tanah Biasa Sedalam 2 M 28,900.00 28,900.00 -
3 SNI - B.6.3 M3 Galian Tanah Biasa Sedalam 3 M 40,400.00 40,400.00 -
4 SNI - B.6.4 M3 Galian Tanah Keras Sedalam 1 M 34,350.00 34,350.00 -
5 SNI - B.6.7 M2 Pekerjaan Striping Setinggi 1 M 2,750.00 2,750.00 -
6 SNI - B.6.8 M3 Pembuangan Tanah Sejauh 150 M 28,300.00 28,300.00 -
7 SNI - B.6.9 M3 Urugan Kembali 10,550.00 10,550.00 -
8 SNI - B.6.10 M3 Pemadatan Tanah 27,500.00 27,500.00 -
9 SNI - B.6.11 M3 Urugan Pasir 162,166.67 171,500.00 146,666.67
10 SNI - B.6.14 M3 Pemasangan Lapisan Ijuk 332,250.00 356,250.00 324,000.00
11 SNI - B.6.15 M3 Urugan Sirtu 103,750.00 109,750.00 90,000.00

C. PEKERJAAN PONDASI BATU KALI


1 SNI - C.6.5 M3 Pas. Pondasi Batu Kali 1 PC : 4 Ps 548,145.56 566,450.00 426,195.56
2 SNI - C.6.6 M3 Pas. Pondasi Batu Kali 1 PC : 5 Ps 516,518.89 534,470.00 394,568.89
3 SNI - C.6.12 M3 Pas. Pondasi Bt.Kali 1 PC : 3 Kp : 10 Ps 450,913.33 474,310.00 328,963.33
4 SNI - C.6.14 M3 Pas. Pondasi Batu Kosong 273,696.67 288,030.00 204,666.67

D. PEKERJAAN DINDING
1 SNI - D.6.3 M2 Pas. Batu Merah tb.1 bata 1Pc:3Ps 185,698.22 194,065.00 137,298.22
2 SNI - D.6.5 M2 Pas. Batu Merah tb.1 bata 1Pc:5Ps 173,282.67 181,520.00 124,882.67
3 SNI - D.6.7 M2 Pas. Batu Merah tb.1 bata 1Pc:3Kp:10Ps 163,482.96 172,779.00 115,082.96
4 SNI - D.6.10 M2 Pas. Batu Merah tb.1/2 bata 1Pc:3Ps 89,232.49 93,331.00 65,282.49
5 SNI - D.6.12 M2 Pas. Batu Merah tb.1/2 bata 1Pc:5Ps 83,840.40 71,084.00 49,390.40
6 SNI - D.6.15 M2 Pas. Batu Merah tb.1/2 bata 1Pc:3Kp:10Ps 81,571.11 86,300.00 57,621.11

E. PEKERJAAN PLESTERAN
1 SNI - E.6.3 M2 Plesteran 1Pc:3Ps tb.1,5 cm 31,916.62 32,194.00 10,616.62
2 SNI - E.6.5 M2 Plesteran 1PC:5Ps tb.1,5 cm 29,518.49 29,776.00 8,218.49
3 SNI - E.6.9 M2 Plesteran 1Pc:3Kp:10Ps tb.1,5 cm 26,866.31 27,312.00 5,566.31
4 SNI - E.6.14 M2 Plesteran 1Pc:3Ps tb.2 cm 44,526.78 44,945.00 17,001.78
5 SNI - E.6.16 M2 Plesteran 1Pc:5Ps tb.2 cm 40,278.42 40,642.00 12,753.42
6 SNI - E.6.28 M2 Berapen 1Pc:5Ps tb.1,5 cm 23,008.71 23,301.00 10,068.71
7 SNI - E.6.30 M2 Plesteran Beton 1Pc:3 Ps tb.1,5 cm 39,666.27 39,971.00 11,616.27
8 SNI - E.6.31 M2 Plesteran Skoning 1Pc:2Ps 8,964.44 8,990.00 884.44
9 SNI - E.6.35 M2 Plesteran Siar Adukan 1Pc:2Ps 20,425.16 20,636.00 7,485.16
F. PEKERJAAN KAYU
1 SNI - F.6.1 M3 Pas. Kusen pintu dan Jendela Ky.Jati 13,855,000.00 13,965,000.00 12,100,000.00
2 SNI - F.6.2 M3 Pas. Kusen pintu dan Jendela Ky.Kamper 9,789,800.00 9,819,800.00 8,164,800.00
3 SNI - F.6.2a M3 Pas. Kusen pintu dan Jendela Ky.Bangkir 9,965,000.00 9,995,000.00 8,340,000.00

35 / 51
PEMERINTAH KABUPATEN BANYUMAS
DINAS PEKERJAAN UMUM KAB. BANYUMAS
DAFTAR HARGA SATUAN PEKERJAAN
Jl.Jend. Gatot Subroto No.III-5 Telp.(0281) 637038
PURWOKERTO HSP
TAHUN 2007
HRG SATUAN (Rp)
NO KODE ANALIS SATUAN JENIS PEKERJAAN KATAGORI I KATAGORI II
SWAKELOLA
(Mudah) (Sulit)

4 SNI - F.6.2b M3 Pas. Kusen pintu dan Jendela Ky.Kruing 7,889,000.00 7,919,000.00 6,264,000.00
5 SNI - F.6.2c M3 Pas. Kusen Pintu dan Jendela Ky Jati (lokal) 13,725,000.00 13,835,000.00 12,100,000.00
6 SNI - F.6.2d M3 Pas. Kusen Pintu dan Jendela Ky Jati Kls I 40,125,000.00 40,125,000.00 38,500,000.00
7 SNI - F.6.2e M3 Pas. Kusen Pintu dan Jendela Ky Bangkir 9,965,000.00 9,995,000.00 8,340,000.00
8 SNI - F.6.7 M2 Pas. Pintu Panil Kayu Jati 692,500.00 696,500.00 460,000.00
9 SNI - F.6.8 M2 Pas. Pintu Panil Kayu Kamper 530,500.00 531,500.00 298,000.00
10 SNI - F.6.8a M2 Pas. Pintu Panil Kayu Bangkir 540,500.00 541,500.00 298,000.00
11 SNI - F.6.8b M2 Pas. Pintu Panil Kayu Kruing 456,500.00 457,500.00 308,000.00
12 SNI - F.6.9 M2 Pas. Pintu dan Jendela Kaca Ky. Jati 588,500.00 592,000.00 402,500.00
13 SNI - F.6.10 M2 Pas. Pintu dan Jendela Kaca Ky.Kamper 446,750.00 447,625.00 260,750.00
14 SNI - F.6.10a M2 Pas. Pintu dan Jendela Kaca Ky.Bangkir 455,500.00 456,375.00 269,500.00
15 SNI - F.6.10b M2 Pas. Pintu dan Jendela Kaca Ky. Kruing 382,000.00 382,875.00 196,000.00
16 SNI - F.6.12 M2 Pas. Pintu dan Jendela Jalusi Ky. Jati 1,017,000.00 1,023,400.00 736,000.00
17 SNI - F.6.13 M2 Pas. Pintu dan Jendela Jalusi Ky. Kamper 767,800.00 769,400.00 476,800.00
18 SNI - F.6.13a M2 Pas. Pintu dan Jendela Jalusi Ky. Bangkir 783,800.00 785,400.00 492,800.00
19 SNI - F.6.13b M2 Pas. Pintu dan Jendela Jalusi Ky. Kruing 649,400.00 651,000.00 358,400.00
20 SNI - F.6.16 M2 Pas. Jalusi Mati Kusen Kayu Jati 863,700.00 867,900.00 693,450.00
21 SNI - F.6.17 M2 Pas. Jalusi Mati Kusen Kayu Kamper 620,700.00 620,400.00 450,450.00
22 SNI - F.6.17a M2 Pas. Jalusi Mati Kusen Kayu Bangkir 635,700.00 635,400.00 465,450.00
23 SNI - F.6.17b M2 Pas. Jalusi Mati Kusen Kayu Kruing 509,700.00 509,400.00 339,450.00
24 SNI - F.6.19 M2 Pas. Pintu Teakwood 3 mm rkp, rk.Ky. Jati 471,100.00 469,610.00 295,600.00
25 SNI - F.6.20 M2 Pas. Pintu Teakwood 3 mm rkp, rk.Ky. Kamper 391,720.00 388,760.00 216,220.00
26 SNI - F.6.20a M2 Pas. Pintu Teakwood 3 mm rkp, rk.Ky. Bangkir 396,620.00 393,660.00 221,120.00
27 SNI - F.6.20b M2 Pas. Pintu Teakwood 3 mm rkp, rk.Ky. Kruing 355,460.00 352,500.00 179,960.00
28 SNI - F.6.20c M2 Pas. Pintu Triplek 3mm rangkap, rk.Ky. Kamper 377,720.00 376,260.00 202,220.00
29 SNI - F.6.20d M2 Pas. Pintu Triplek 3mm rangkap, rk.Ky. Bangkir 382,620.00 381,160.00 207,120.00
30 SNI - F.6.20e M2 Pas. Pintu Triplek 3mm rangkap, rk.Ky. Kruing 341,460.00 340,000.00 165,960.00
31 SNI - F.6.27 M3 Pas. Konstruksi Kuda-kuda Kayu Jati 13,490,000.00 13,388,700.00 12,416,000.00
32 SNI - F.6.28 M3 Pas. Konstruksi Kuda-kuda Kayu Kamper 8,874,400.00 8,690,600.00 7,800,400.00
33 SNI - F.6.28a M3 Pas. Konstruksi Kuda-kuda Kayu Bangkir 9,035,000.00 8,851,200.00 7,961,000.00
34 SNI - F.6.28b M3 Pas. Konstruksi Kuda-kuda Kayu Bangkir (Uk. Khusus) 9,640,000.00 9,428,700.00 8,566,000.00
35 SNI - F.6.30 M3 Pas. Konstruksi Kuda-kuda Kayu Kruing 7,132,000.00 6,948,200.00 6,058,000.00
Pas. Kaso dan Reng genteng (kodok, plentong, vlams
36 SNI - F.6.31 M2 85,650.00 84,300.00 73,200.00
dan sejenisnya) Kayu Kamper
Pas. Kaso dan Reng genteng (kodok, plentong, vlams
37 SNI - F.6.31a M2 88,650.00 87,300.00 76,200.00
dan sejenisnya) Kayu Bangkir
Pas. Kaso dan Reng genteng (kodok, plentong, vlams
38 SNI - F.6.31b M2 74,250.00 72,900.00 61,800.00
dan sejenisnya) Kayu Kruing
Pas. Kaso dan Reng genteng (kodok, plentong, vlams
39 SNI - F.6.31c M2 59,190.00 57,840.00 46,740.00
dan sejenisnya) Kayu Meranti
Pas. Kaso dan Reng genteng (kodok, plentong, vlams
40 SNI - F.6.31d M2 92,250.00 90,600.00 79,800.00
dan sejenisnya) Kayu Bangkir uk. Khusus
Pas. Kaso dan Reng genteng (monier dan sejenisnya)
41 SNI - F.6.35 M2 97,350.00 96,050.00 84,900.00
Kayu Kamper
Pas. Kaso dan Reng genteng (monier dan sejenisnya)
42 SNI - F.6.35a M2 100,850.00 99,550.00 88,400.00
Kayu Bangkir
Pas. Kaso dan Reng genteng (monier dan sejenisnya)
43 SNI - F.6.35b M2 84,050.00 82,750.00 71,600.00
Kayu Kruing
44 SNI - F.6.35c M2 Pas. Usuk 6/12 p .6-8 m' Kayu Bangkir 193,955.00 194,480.00 150,180.00
45 SNI - F.6.35d M3 Pas. Usuk 5/10 kayu Bangkir uk. Khusus #REF! #REF! #REF!
46 SNI - F.6.38 M2 Pas. Rangka Langit-Langit Uk.(1x1)m Ky.Jati 145,250.00 145,350.00 116,000.00
47 SNI - F.6.39 M2 Pas. Rangka Langit-Langit Uk.(1x1)m Ky.Kamper 101,450.00 100,650.00 72,200.00
48 SNI - F.6.39a M2 Pas. Rangka Langit-Langit Uk.(1x1)m Ky.Bangkir 104,450.00 103,650.00 75,200.00
49 SNI - F.6.39b M2 Pas. Rangka Langit-Langit Uk.(1x1)m Ky.Kruing 90,050.00 89,250.00 60,800.00
50 SNI - F.6.39c M2 Pas. Rangka Langit-Langit Uk.(1x1)m Ky.Meranti 74,990.00 74,190.00 45,740.00

36 / 51
PEMERINTAH KABUPATEN BANYUMAS
DINAS PEKERJAAN UMUM KAB. BANYUMAS
DAFTAR HARGA SATUAN PEKERJAAN
Jl.Jend. Gatot Subroto No.III-5 Telp.(0281) 637038
PURWOKERTO HSP
TAHUN 2007
HRG SATUAN (Rp)
NO KODE ANALIS SATUAN JENIS PEKERJAAN KATAGORI I KATAGORI II
SWAKELOLA
(Mudah) (Sulit)
51 SNI - F.6.44 M2 Pas. Rangka Langit-Langit Uk.(0.3x0.3)m Ky.Kamper 200,275.00 198,750.00 161,950.00
52 SNI - F.6.44a M2 Pas. Rangka Langit-Langit Uk.(0.3x0.3)m Ky.Bangkir 207,025.00 205,500.00 168,700.00
53 SNI - F.6.44b M2 Pas. Rangka Langit-Langit Uk.(0.3x0.3)m Ky.Kruing 174,625.00 173,100.00 136,300.00
54 SNI - F.6.44c M2 Pas. Rangka Langit-Langit Uk.(0.3x0.3)m Ky.Meranti 140,740.00 139,215.00 102,415.00
55 SNI - F.6.47 M' Pas. Lisplank Uk. (3 x 20) cm Kayu Jati 103,800.00 103,970.00 83,800.00
56 SNI - F.6.48 M' Pas. Lisplank Uk. (3 x 20) cm Kayu Kamper 74,290.00 73,920.00 54,640.00
57 SNI - F.6.48a M' Pas. Lisplank Uk. (3 x 20) cm Kayu Bangkir 76,090.00 75,720.00 56,440.00
58 SNI - F.6.48b M' Pas. Lisplank Uk. (3 x 20) cm Kayu Kruing 60,970.00 60,600.00 41,320.00
59 SNI - F.6.52 M' Pas. Lisplank Uk. 2 (2 x 20) cm Kayu Jati 114,800.00 115,000.00 100,100.00
60 SNI - F.6.52a M' Pas. Lisplank Uk. 2 (2 x 20) cm Kayu Kamper 79,970.00 79,525.00 65,270.00
61 SNI - F.6.52b M' Pas. Lisplank Uk. 2 (2 x 20) cm Kayu Bangkir 82,120.00 81,675.00 67,420.00
62 SNI - F.6.52c M' Pas. Lisplank Uk. 2 (2 x 20) cm Kayu Kruing 64,060.00 63,615.00 49,360.00

G. PEKERJAAN BETON
1 SNI - G.6.1 M3 Membuat Beton Tumbuk 1Pc:3Ps:5Kr 603,695.56 620,800.00 499,195.56
2 SNI - G.6.4 M3 Lantai Kerja Beton Tumbuk 1Pc:3Ps:5Kr tb.5cm 83,137.78 83,980.00 23,897.78
3 SNI - G.6.7 M3 Membuat Beton Cor 1Pc:2Ps:2,5Kr 749,504.44 767,900.00 645,004.44
4 SNI - G.6.13 M3 Membuat Beton Cor 1Pc:2Ps:3Kr 817,080.00 836,100.00 641,880.00
5 SNI - G.6.25 Kg Pembesian dengan Besi Beton Polos 13,769.00 14,819.00 12,900.00
6 SNI - G.6.25a Kg Pembesian dengan Besi Beton Ulir 14,819.00 15,869.00 13,950.00
7 SNI - G.6.28 M2 Pas. Bekisting untuk Pondasi 99,970.00 84,670.00 66,000.00
8 SNI - G.6.29 M2 Pas. Bekisting untuk Sloof 107,470.00 90,670.00 73,500.00
9 SNI - G.6.30 M2 Pas. Bekisting untuk Kolom 135,367.50 265,760.00 231,675.00
10 SNI - G.6.31 M2 Pas. Bekisting untuk Balok 141,335.00 277,770.00 242,610.00
11 SNI - G.6.32 M2 Pas. Bekisting untuk Lantai 195,867.50 406,760.00 351,675.00
12 SNI - G.6.33 M2 Pas. Bekisting untuk Dinding 374,960.00 380,110.00 334,900.00
13 SNI - G.6.34 M2 Pas. Bekisting untuk Tangga 256,735.00 254,760.00 216,675.00
14 SNI - G.6.45 M' Memb. Kolom Penguat Beton Bertulang (11x11)cm 63,143.33 65,650.00 55,673.33
15 SNI - G.6.46 M' Membuat Ring Balok Beton Bertulang (10x15)cm 72,325.00 75,135.00 59,940.00

H. PEKERJAAN ATAP
1 SNI - H.6.1 M2 Pas. Atap Genteng Plentong Kecil 35,335.00 36,460.00 22,000.00
2 SNI - H.6.2 M2 Pas. Atap Genteng Kodok 43,335.00 43,585.00 30,000.00
3 SNI - H.6.4 M' Pas. Atap Genteng Bubung Plentong 62,401.11 63,060.00 27,901.11
4 SNI - H.6.12 M2 Pas. Asbes Gelombang Uk.(3,00x1,05m)x4mm 42,450.00 43,750.00 30,060.00
5 SNI - H.6.13 M2 Pas. Asbes Gelombang Uk.(2,70x1,05m)x4mm 44,550.00 45,990.00 32,160.00
6 SNI - H.6.14 M2 Pas. Asbes Gelombang Uk.(2,40x1,05m)x4mm 42,235.00 43,715.00 30,040.00
7 SNI - H.6.15 M2 Pas. Asbes Gelombang Uk.(2,10x1,05m)x4mm 43,005.00 44,625.00 30,810.00
8 SNI - H.6.16 M2 Pas. Asbes Gelombang Uk.(1,50x1,05m)x4mm 46,555.00 48,755.00 34,360.00
9 SNI - H.6.16.a M2 Pas. Atap seng Galvalum 84,555.00 87,555.00 72,360.00
10 SNI - H.6.23 M' Pas. Nok Stel Asbes Gelombang Uk. 1,05m 74,485.00 75,535.00 61,050.00
11 SNI - H.6.30 M2 Pas. Atap Genteng Beton 60,100.00 59,770.00 42,400.00
12 SNI - H.6.30a M2 Pas. Atap Genteng Morando 90,300.00 67,470.00 50,100.00
13 SNI - H.6.34 M' Pas. Atap Nok Genteng Beton 666,138.22 87,530.00 71,138.22
14 SNI - H.6.34a M' Pas. Atap Nok Genteng Morando 123,135.11 77,175.00 37,860.11
15 SNI - H.6.38 M2 Pas. Atap Seng Gelombang BJLS 20 36,980.00 37,695.00 26,360.00
16 SNI - H.6.39 M2 Pas. Atap Nok Seng 21,030.00 21,360.00 8,120.00
17 SNI - H.6.40 M' Pas. Talang Datar Seng BJS 30 Ky.Meranti 91,447.50 92,448.75 56,135.00
18 SNI - H.6.40a M' Pas. Talang Datar Seng BJS 30 Ky.Kruing 151,857.50 153,143.75 122,045.00
19 SNI - H.6.41 M' Pas. Talang Miring Seng BJS 30 Ky.Meranti 126,682.50 127,968.75 96,870.00
20 SNI - H.6.41a M' Pas. Talang Miring Seng BJS 30 Ky.Kruing 151,857.50 153,143.75 122,045.00
21 SNI - H.6.42 M2 Pas. Aluminium Foil / Sisalation 25,150.00 25,675.00 13,650.00
22 SNI - H.6.43 M2 Pas. Kawat Burung Kayu Meranti 35,780.00 36,685.00 23,555.00
23 SNI - H.6.43a M2 Pas. Kawat Burung Kayu Kruing 38,165.00 39,070.00 25,940.00

I. PEKERJAAN LANGIT - LANGIT

37 / 51
PEMERINTAH KABUPATEN BANYUMAS
DINAS PEKERJAAN UMUM KAB. BANYUMAS
DAFTAR HARGA SATUAN PEKERJAAN
Jl.Jend. Gatot Subroto No.III-5 Telp.(0281) 637038
PURWOKERTO HSP
TAHUN 2007
HRG SATUAN (Rp)
NO KODE ANALIS SATUAN JENIS PEKERJAAN KATAGORI I KATAGORI II
SWAKELOLA
(Mudah) (Sulit)
1 SNI - I.6.19 M' Lis Langit-langit Kayu Propil Kayu Kruing 12,530.00 12,960.00 6,280.00
2 SNI - I.6.19a M' Lis Langit-langgit Kayu Kruing 10,330.00 10,760.00 4,080.00
3 SNI - I.6.20 M2 Langit-langit Eternit Rk.Ky.Kamper Uk.(1x1)m 110,670.00 110,250.00 78,180.00
4 SNI - I.6.20a M2 Langit-langit Eternit Rk.Ky.Bangkir Uk. (1x1)m 113,670.00 113,250.00 81,180.00
5 SNI - I.6.20b M2 Langit-langit Eternit Rk.Ky.Kruing Uk. (1x1)m 99,270.00 98,850.00 66,780.00
6 SNI - I.6.20c M2 Langit-langit Eternit Rk.Ky.Meranti Uk. (1x1)m 83,760.00 83,340.00 51,720.00
7 SNI - I.6.20d M2 Langit-langit Harplek 4mm Rk.Ky.Kruing Uk. (1x1)m 115,210.00 114,790.00 82,720.00
8 SNI - I.6.20e M2 Langit-langit Harplek 4mm Rk.Ky.Meranti Uk. (1x1)m 100,690.00 100,270.00 68,200.00
9 SNI - I.6.24 M2 Langit-langit Gypsum board tb.9mm 25,732.00 25,823.00 16,882.00
J. PEKERJAAN SANITASI
1 SNI - J.6.1 Bh Pasang Kloset Duduk / Monoblok 1,516,570.00 1,755,070.00 1,484,000.00
2 SNI - J.6.2 Bh Pasang Kloset Jongkok Porselen 344,402.22 424,600.00 158,902.22
3 SNI - J.6.4 Bh Pasang Urinoir 655,902.22 682,100.00 528,902.22
4 SNI - J.6.5 Bh Pasang Wastafel 402,652.22 716,450.00 540,902.22
5 SNI - J.6.7 Bh Pasang Bak Mandi Fiberglass vol. 0,30 m3 air 485,800.00 494,060.00 177,000.00
6 SNI - J.6.8 Bh Pasang Bak Mandi Batu Bata vol. 0,30 m3 air. 997,206.67 1,049,580.00 466,206.67
7 SNI - J.6.9 Bh Pasang Bath tubh Porselen 4,703,075.00 4,869,875.00 4,633,200.00
8 SNI - J.6.11 Bh Pasang Bak Fiberglass vol. 1 m3 air 931,300.00 931,300.00 380,800.00
9 SNI - J.6.16 Bh Pas. Bak Kontrol pas.Bt.Bata uk.(35x35)cm T:35 cm 348,798.39 357,607.75 357,607.75
10 SNI - J.6.17 Bh Pas. Bak Kontrol pas.Bt.Bata uk.(45x45)cm T:50 cm 313,808.89 327,822.50 205,223.89
11 SNI - J.6.18 Bh Pas. Bak Kontrol pas.Bt.Bata uk.(60x60)cm T:65 cm 483,733.66 505,374.45 313,493.66
12 SNI - J.6.19 M' Pasang Pipa Galvanis diam. 1/2" med. B 30,680.00 31,455.00 20,150.00
13 SNI - J.6.20 M' Pasang Pipa Galvanis diam. 3/4" med. B 35,330.00 36,105.00 24,800.00
14 SNI - J.6.21 M' Pasang Pipa Galvanis diam. 1" med. B 43,080.00 44,630.00 32,550.00
15 SNI - J.6.22 M' Pasang Pipa Galvanis diam. 1 1/2" med. B 63,580.00 66,680.00 44,950.00
16 SNI - J.6.22a M' Pasang Pipa Galvanis diam. 2" med. B 93,030.00 96,130.00 74,400.00
17 SNI - J.6.23 M' Pasang Pipa Galvanis diam. 3" med. B 136,430.00 139,530.00 117,800.00
18 SNI - J.6.24 M' Pasang Pipa Galvanis diam. 4" med. B 179,840.00 186,040.00 156,550.00
19 SNI - J.6.25 M' Pasang Pipa PVC diam. 1/2" type AW 10,550.00 10,860.00 4,340.00
20 SNI - J.6.26 M' Pasang Pipa PVC diam. 3/4" type AW 12,410.00 13,185.00 6,200.00
21 SNI - J.6.27 M' Pasang Pipa PVC diam. 1" type AW 13,960.00 15,510.00 7,750.00
22 SNI - J.6.28 M' Pasang Pipa PVC diam. 1 1/2" type AW 21,710.00 23,260.00 15,500.00
23 SNI - J.6.29 M' Pasang Pipa PVC diam. 2" type AW 29,465.00 31,015.00 20,150.00
24 SNI - J.6.31 M' Pasang Pipa PVC diam. 3" type AW 51,165.00 52,715.00 41,850.00
25 SNI - J.6.32 M' Pasang Pipa PVC diam. 4" type AW 83,725.00 85,275.00 69,750.00
26 SNI - J.6.33 Bh Pasang Bak Cuci Piring Stainless Steel 258,175.00 267,175.00 235,000.00
27 SNI - J.6.35 Bh Pasang Kran diameter 3/4". 68,000.00 28,000.00 60,050.00
28 SNI - J.6.35a Bh Pasang Kran diameter 1/2" 68,000.00 23,000.00 60,050.00
29 SNI - J.6.36 Bh Pasang Floor Drain 26,950.00 27,950.00 27,950.00
K. PEKERJAAN KUNCI DAN KACA
1 SNI - K.6.1 Bh Pasang Kunci tanam antik 346,350.00 346,350.00 300,000.00
2 SNI - K.6.2 Bh Pasang Kunci Tanam Biasa 118,950.00 118,950.00 85,000.00
3 SNI - K.6.3 Bh Pasang Kunci Tanam Kamar Mandi 65,950.00 65,950.00 32,000.00
4 SNI - K.6.5 Bh Pasang Engsel Pintu 18,587.50 18,587.50 7,000.00
5 SNI - K.6.6 Bh Pasang Engsel Jendela Kupu-kupu 16,087.50 16,087.50 4,500.00
6 SNI - K.6.7 Bh Pasang Engsel Angin 35,900.00 35,900.00 20,000.00
7 SNI - K.6.9 Bh Pasang Kait Angin model lipat 16,587.50 16,587.50 5,000.00
8 SNI - K.6.9.a Bh Pasang Kait Angin model antik 28,087.50 28,087.50 16,500.00
9 SNI - K.6.10 Bh Pasang Door Closer 238,625.00 238,625.00 200,000.00
10 SNI - K.6.11 Bh Pasang Kunci Selot 100,450.00 100,450.00 85,000.00
11 SNI - K.6.12 Bh Pasang Pegangan pintu/Door Holder 214,125.00 214,125.00 175,500.00
12 SNI - K.6.13 Bh Pasang Door Stop 32,725.00 32,725.00 25,000.00
13 SNI - K.6.14 Bh Pasang Rel Pintu Dorong 346,350.00 356,350.00 300,000.00
14 SNI - K.6.16 Bh Pasang Kaca tb. 3mm 64,387.50 67,687.50 52,800.00
15 SNI - K.6.17 Bh Pasang Kaca tb. 5mm 83,087.50 84,187.50 71,500.00
16 SNI - K.6.18 Bh Pasang Kaca tb. 8mm 183,245.00 187,645.00 170,500.00
17 SNI - K.6.20 Bh Pasang Kaca Cermin tb. 5mm 176,587.50 177,687.50 165,000.00

38 / 51
PEMERINTAH KABUPATEN BANYUMAS
DINAS PEKERJAAN UMUM KAB. BANYUMAS
DAFTAR HARGA SATUAN PEKERJAAN
Jl.Jend. Gatot Subroto No.III-5 Telp.(0281) 637038
PURWOKERTO HSP
TAHUN 2007
HRG SATUAN (Rp)
NO KODE ANALIS SATUAN JENIS PEKERJAAN KATAGORI I KATAGORI II
SWAKELOLA
(Mudah) (Sulit)
L. PEKERJAAN LANTAI
1 SNI - L.6.2 M2 Pas. Lantai Ubin PC Abu-abu 30 x 30 cm 61,817.78 64,985.28 39,167.78
2 SNI - L.6.3 M2 Pas. Lantai Ubin PC Abu-abu 20 x 20 cm 57,047.00 60,010.00 33,512.00
3 SNI - L.6.44 M2 Pas. Lantai Keramik 20 x 20 cm KW.I 128,899.73 137,954.00 71,199.73
4 SNI - L.6.44a M2 Pas. Lantai Keramik 20 x 20 cm KW.II 123,899.73 132,954.00 66,199.73
5 SNI - L.6.47 M2 Pas. Lantai Keramik 33 x 33 cm KW.I 136,399.73 147,954.00 78,699.73
6 SNI - L.6.47a M2 Pas. Lantai Keramik 33 x 33 cm KW.II 133,899.73 145,454.00 76,199.73
7 SNI - L.6.47b M2 Pas. Lantai Keramik 40 x 40 cm KW.I 138,899.73 144,516.50 66,199.73
8 SNI - L.6.47c M2 Pas. Lantai Keramik 40 x 40 cm KW.II 135,399.73 145,454.00 77,699.73
9 SNI - L.6.47d M2 Pas. Lantai Keramik 30 x 30 cm KW.I 128,399.73 137,954.00 70,699.73
10 SNI - L.6.47e M2 Pas. Lantai Keramik 30 x 30 cm KW.II 122,399.73 131,954.00 64,699.73
11 SNI - L.6.48 M2 Pas. Lt. Keramik Anti Slip 33x33 cm KW.I 131,399.73 140,454.00 73,699.73
12 SNI - L.6.48a M2 Pas. Lt.Keramik Anti Slip 33x33 cm KW.II 123,899.73 132,954.00 66,199.73
13 SNI - L.6.48b M2 Pas. Lt.Keramik Anti Slip 40x40 cm KW.I 143,399.73 181,754.00 95,299.73
14 SNI - L.6.48c M2 Pas. Lt.Keramik Anti Slip 40x40 cm KW.II 135,399.73 145,454.00 77,699.73
15 SNI - L.6.48d M2 Pas. Lt.Keramik Anti Slip 30x30 cm KW.I 128,399.73 137,954.00 70,699.73
16 SNI - L.6.48e M2 Pas. Lt.Keramik Anti Slip 30x30 cm KW.II 125,399.73 134,954.00 67,699.73
17 SNI - L.6.68 M2 Pas. Dinding Keramik 20x20 cm KW.I 130,254.00 81,580.00 32,729.00
Pas. Dinding Keramik 20x25 cm KW.I 130,254.00 81,580.00 32,729.00
18 SNI - L.6.68a M2 Pas. Dinding Keramik 20x20 cm KW.II 104,254.00 116,830.00 63,104.00
Pas. Dinding Keramik 20x25 cm KW.II 104,254.00 116,830.00 63,104.00

M. PEKERJAAN PENGECATAN
1 SNI - M.6.1 M2 Mengerok Permukaan Cat Tembok Lama 8,375.00 8,425.00 750.00
2 SNI - M.6.6 M2 Mendempul dan Menggosok Kayu 6,047.75 6,110.00 1,042.75
3 SNI - M.6.7 M2 Mengecat kayu Lama 22,025.00 22,270.00 13,000.00
4 SNI - M.6.8 M2 Mengecat kayu 2 x jadi (Sek. Avian) 22,755.00 23,245.00 18,125.00
5 SNI - M.6.9 M2 Mengecat kayu 3 x jadi (Sek. Avian) 31,780.00 32,315.00 21,050.00
6 SNI - M.6.11 M2 Pelaburan Kayu dgn Politur 22,195.00 22,195.00 17,050.00
7 SNI - M.6.12 M2 Pelaburan Kayu dgn Cat Residu dan Ter 6,350.00 6,350.00 1,050.00
8 SNI - M.6.14 M2 Mengecat Tembok 2x utk interior(sek.Mowilex) 38,811.00 19,551.00 33,150.00
9 SNI - M.6.14a M2 Mengecat Tembok 4x utk exterior (sek.Mowilex) 38,811.00 27,651.00 33,150.00
10 SNI - M.6.14b M2 Mengecat Tembok 4x (sek.Catylac) 12,531.00 11,451.00 6,870.00
11 SNI - M.6.14c M2 Mengecat Tembok 4x (sek.Decolith) 12,531.00 10,911.00 6,870.00
12 SNI - M.6.14d M2 Mengecat Tembok 4x (sek.Molex) 38,811.00 8,571.00 33,150.00
13 SNI - M.6.15 M2 Mengecat Tembok lama 2x utk interior(sek.Mowilex) 31,549.00 15,499.00 27,000.00
14 SNI - M.6.15a M2 Mengecat Tembok lama 2x utk exterior(sek.Mowilex) 31,549.00 22,249.00 27,000.00
15 SNI - M.6.15b M2 Mengecat Tembok lama 2x (sek.Catylac) 9,649.00 8,749.00 5,100.00
16 SNI - M.6.15c M2 Mengecat Tembok lama 2x (sek.Decolith) 9,649.00 8,299.00 5,100.00
17 SNI - M.6.15d M2 Mengecat Tembok lama 2x (sek.Mollex) 31,549.00 6,349.00 27,000.00
18 SNI - M.6.17 M2 Melabur Tembok dengan Kapur Sirih 10,567.00 10,647.00 2,870.00
19 SNI - M.6.18 M2 Melabur Tembok Lama dgn Kapur Sirih 4,925.00 4,985.00 2,440.00
20 SNI - M.6.20 M2 Mengecat Baja dengan Meni Besi 17,038.00 17,140.00 1,138.00
21 SNI - M.6.21 M2 Mengecat Baja dgn Meni Besi & Perancah 32,113.00 32,215.00 3,038.00
22 SNI - M.6.24 M2 Mengecat Baja 3x cat konvensional 119,700.00 119,880.00 11,700.00
ANALISA BOW
A. PEKERJAAN PAVING
1 BOW - KPU.IVa M2 Pas. Paving Blok Natural 6 cm 122,622.22 80,400.00 72,222.22
2 BOW - KPU.IVb M2 Pas. Paving Blok Warna 6 cm 107,622.22 84,400.00 72,222.22
3 BOW - KPU.IVc M2 Pas. Paving Blok T = 8cm K-400 127,622.22 176,400.00 92,222.22
4 BOW - KPU.IVd M2 Pas. Paving Blok T = 6cm K-300 127,622.22 113,400.00 92,222.22

B. PEKERJAAN KAP BESI


1 BOW - I.a Kg Pekerjaan Kap Besi 24,550.00 23,450.00 12,100.00

39 / 51
PEMERINTAH KABUPATEN BANYUMAS
DINAS PEKERJAAN UMUM KAB. BANYUMAS
DAFTAR HARGA SATUAN PEKERJAAN
Jl.Jend. Gatot Subroto No.III-5 Telp.(0281) 637038
PURWOKERTO HSP
TAHUN 2007
HRG SATUAN (Rp)
NO KODE ANALIS SATUAN JENIS PEKERJAAN KATAGORI I KATAGORI II
SWAKELOLA
(Mudah) (Sulit)

C. PEKERJAAN KAYU
1 BOW - F.16 M2 Pas. Kembali Usuk dan Reng Bekas 17,450.00 14,700.00 5,000.00
2 BOW - F.16a M2 Pas. Reng Kayu Kruing 27,637.50 25,732.50 18,300.00
3 BOW - F.16b M2 Usuk Diketam Halus dan Reng Ky.Kruing 88,700.00 86,250.00 63,800.00
4 BOW - F.16c M2 Usuk Diketam Halus dan Reng Ky.Bangkir 103,100.00 100,650.00 78,200.00
5 BOW - F.16d M2 Usuk Diketam Halus dan Reng Ky.Kamper 100,100.00 97,650.00 75,200.00
6 BOW - F.16e M2 Usuk Diketam Halus dan Reng Ky.Jati 143,900.00 142,350.00 119,000.00
7 BOW - F.16f M2 Pas. Usuk Kayu Kruing 71,887.50 70,125.00 62,550.00
8 BOW - F.16g M2 Pas. Usuk Kayu Bangkir 86,287.50 84,525.00 76,950.00
9 BOW - Supl.VIIIa M2 Plafond Harplek Diatas Usuk 29,160.00 28,920.00 19,160.00
10 BOW - Supl.VIIIb M2 PlaFond Eternit Diatas Usuk 18,060.00 17,820.00 7,060.00
11 BOW - F.36a M2 Pintu Kaca Kayu Kruing tebal 3,5 cm 683,760.00 684,670.00 146,760.00
12 BOW - F.36b M2 Pintu Kaca Kayu Kruing Sederhana tebal 3,5 cm 493,060.00 493,920.00 135,560.00
13 BOW - F.36c M2 Pintu Kaca Kayu Bangkir tebal 3,5 cm 721,560.00 722,470.00 184,560.00
14 BOW - F.36d M2 Pintu Kaca Kayu Kamper tebal 3,5 cm 717,060.00 717,970.00 180,060.00
15 BOW - F.36e M2 Pintu Kaca Kayu Jati tebal 3,5 cm 778,060.00 781,720.00 241,060.00
16 BOW - F.36f M2 Jendela Kaca Kayu Kruing tebal 2,5 cm 504,010.00 506,170.00 101,260.00
17 BOW - F.36g M2 Jendela Kaca Kayu Kruing Sederhana tebal 3 cm 369,760.00 371,920.00 101,260.00
18 BOW - F.36h M2 Jendela Kaca Kayu Bangkir tebal 2,5 cm 529,210.00 531,370.00 126,460.00
19 BOW - F.36i M2 Jendela Kaca Kayu Kamper tebal 2,5 cm 526,210.00 528,370.00 123,460.00
20 BOW - F.36j M2 Jendela Kaca Kayu Jati tebal 2,5 cm 574,810.00 577,870.00 172,060.00
21 BOW - F.36k M2 Pintu Panil Multiplek 9 mm Rangka Kayu Jati tebal 3,5 c 616,600.00 619,520.00 258,800.00
22 BOW - F.36l M2 Pintu Panil Multiplek 9 mm Rangka Kayu Kruing 510,400.00 511,970.00 152,600.00
23 BOW - F.36m M2 Pintu Panil Multiplek 9 mm Rangka Kayu Bangkir 548,200.00 549,770.00 190,400.00
24 BOW - F.36n M2 Pintu Panil Multiplek 9 mm Rangka Kayu Kamper 588,800.00 589,920.00 51,800.00

D. PEKERJAAN ATAP
1 BOW - K.6+23 M2 Mengecat Plapond 3x jadi ( Sek. Catylac ) 26,863.50 25,663.50 6,800.00
2 BOW - K.6+23a M2 Mengecat Plapond 3x jadi ( Sek. Decolith ) 26,860.00 25,060.00 6,800.00
3 BOW - K.6+23b M2 Mengecat Plapond 3x jadi ( Sek. Mollex ) 56,060.00 22,460.00 36,000.00
4 BOW - K.6+23c M2 Mengecat Genteng 3x jadi (Sek. Tamitex) 26,660.00 26,660.00 6,600.00
PEKERJAAN BETON
E. PEKERJAAN BETON
1 BOW - F.8 M2 Cetakan Kayu Tahun 134,500.00 118,100.00 68,000.00
PEKERJAAN PASANGAN BATU GRANIT
F. PEKERJAAN PEMASANGAN BATU GRANIT
1 BOW-G.14 M3 Perekat camp. 1 Pc : 2 Psr 867,727.11 886,860.00 867,727.11
2 BOW-G.13 M3 Perekat camp. 1 Pc : 1 Psr 1,204,851.56 1,227,785.00 1,204,851.56
3 BOW-G.77 M2 Upah Pasang Lembaran Batu Granit 623,000.00 623,000.00 -
4 BOW-Supl.IVa M2 Pasang lantai Batu Granit 908,901.81 909,475.80 285,901.81
5 BOW-Supl.IVb M2 Pasang Pelapis Dinding Batu Granit 1,407,807.03 1,458,335.70 784,807.03
6 BOW-Supl.IVc M2 Pelapisan Coating 3x ( sebelum dipasang ) 13,800.00 13,800.00 8,550.00
7 BOW-Supl.IVd M2 Pelapisan Coating 1x ( setelah dipasang ) 8,300.00 8,300.00 5,700.00
8 BOW-Supl.IVe M2 Pemolesan Lantai Batu Granit ( sampai mengkilap ) 151,300.00 151,300.00 130,800.00
9 BOW-Supl.IVf M2 Pemolesan Lembaran Batu Granit ( Rata, Halus tidak men 33,300.00 33,300.00 18,700.00
10 BOW-Supl.IVg M2 Penyemiran Lantai 11,325.00 11,325.00 4,825.00
11 BOW-G.69 M3 Upah Pasang Tegel 44,250.00 44,250.00 -
12 BOW-Supl.IVh M2 Pasang Tegel Batu Candi 220,008.05 225,696.05 164,695.55
13 BOW-Supl.IVi M2 Pasang Koral Sikat 237,470.55 255,658.55 148,970.55
14 BOW-Supl.IVj M2 Pasang Pelapis Dinding Batu Granit Import 2,530,807.03 2,131,335.70 1,284,807.03
PEKERJAAN LAIN - LAIN
1 Up.SNI-H.6.1 M2 Upah Pas. Genteng lama 13,335.00 13,335.00 0.00
2 Ls.01 Bh Pas. Grendel pintu 6,000.00 6,000.00 6,000.00

40 / 51
PEMERINTAH KABUPATEN BANYUMAS
DINAS PEKERJAAN UMUM KAB. BANYUMAS
DAFTAR HARGA SATUAN PEKERJAAN
Jl.Jend. Gatot Subroto No.III-5 Telp.(0281) 637038
PURWOKERTO HSP
TAHUN 2007
HRG SATUAN (Rp)
NO KODE ANALIS SATUAN JENIS PEKERJAAN KATAGORI I KATAGORI II
SWAKELOLA
(Mudah) (Sulit)
3 Ls.02 Bh Pas. Grendel jendela 4,000.00 4,000.00 4,000.00
4 Ls.03 Bh Pas. Tarikan jendela 4,500.00 4,500.00 4,500.00
5 Ls.04 Daun Pas. Kaca Nako 5 mm + Tralis 20,000.00 20,000.00 20,000.00
6 Ls.05 Kg Pas. Besi, Doog, Angkur 7,000.00 7,000.00 7,000.00
7 Ls.06 Kg Pas. Begel 7,000.00 7,000.00 7,000.00
8 Ls.07 M' Pas. Tutup Lisplank Kayu Kruing Lapis Seng 15,000.00 15,000.00 15,000.00
9 Ls.08 Unit Pembuatan Septictank 1 x 1 x 2 m + Peresapan 5,952,064.18 6,105,154.00 4,391,336.18
10 Ls.09 Unit Pembuatan Septictank 1.5 x 2 x 2 m + Peresapan 8,306,249.09 8,545,682.95 5,729,112.34
11 Ls.11 Titik Pas. Instalasi Titik Cahaya / Lampu 150,000.00 150,000.00 150,000.00
12 Ls.12 Titik Pas. Instalasi Stop Kontak 150,000.00 150,000.00 150,000.00
13 Ls.13 Titik Pas. A r d e 150,000.00 150,000.00 150,000.00
14 Ls.14 Unit Biaya Sambungan Listrik ( PLN ) 900 watt 388,410.00 388,410.00 388,410.00
15 Ls.15 Unit Biaya Sambungan Listrik ( PLN ) 450 watt 226,050.00 226,050.00 226,050.00
16 Ls.16 Unit Biaya Sambungan Listrik ( PLN ) 1300 watt 559,570.00 559,570.00 559,570.00
17 Ls.16.a Unit Biaya Sambungan Listrik ( PLN ) 2200 watt 944,680.00 944,680.00 944,680.00
18 Ls.17 Bh Pas. Shock 1/2" PVC 1,250.00 1,250.00 1,250.00
19 Ls.18 Bh Pas. Shock 3/4" PVC 1,750.00 1,750.00 1,750.00
20 Ls.19 Bh Pas. Shock 2" PVC 4,000.00 4,000.00 4,000.00
21 Ls.20 Bh Pas. Shock 3" PVC 7,000.00 7,000.00 7,000.00
22 Ls.21 Bh Pas. Shock 4" PVC 12,500.00 12,500.00 12,500.00
23 Ls.22 Bh Pas. Kenie 1/2" PVC 2,000.00 2,000.00 2,000.00
24 Ls.23 Bh Pas. Kenie 3/4" PVC 2,500.00 2,500.00 2,500.00
25 Ls.24 Bh Pas. Kenie 2" PVC 5,000.00 5,000.00 5,000.00
26 Ls.25 Bh Pas. Kenie 3" PVC 12,500.00 12,500.00 12,500.00
27 Ls.26 Bh Pas. Kenie 4" PVC 25,000.00 25,000.00 25,000.00
28 Ls.27 M' Pas. Saluran U 20x25 dengan buis beton 58,000.00 58,000.00 58,000.00
29 Ls.31 M' Pas. Papan Sanggan Talang 2 x 20 cm kayu kruing 40,000.00 40,000.00 40,000.00
30 Ls.32 M' Pas. Papan Suri - suri 2 x 20 cm Kayu Kruing 25,000.00 25,000.00 25,000.00
31 Ls.33 M' Pas. Papan Suri - suri 2 / 20 cm Kayu Jati 47,000.00 47,000.00 47,000.00
32 Ls.34 M' Pas. Kawat Duri 3,000.00 3,000.00 3,000.00
33 Ls.35 M2 Pengrosokan Halaman tebal 7 cm 3,250.00 3,250.00 3,250.00
34 Ls.36 Unit Pas. Lampu TL 20 watt 50,000.00 50,000.00 50,000.00
35 Ls.37 Unit Pas. Lampu TL 40 watt 60,000.00 60,000.00 60,000.00
36 Ls.38 Bh Pas. Lampu Pijar 4,000.00 4,000.00 4,000.00
37 Ls.39 Bh Pas. Lampu SL 18 watt 60,000.00 60,000.00 60,000.00
38 Ls.40 Btg Pas. Talang PVC U 75,000.00 75,000.00 75,000.00
39 Ls.41 Bh Pas. Tutup Talang PVC U 3,000.00 3,000.00 3,000.00
40 Ls.42 Bh Pas. Hak Talang PVC U 6,500.00 6,500.00 6,500.00
41 Ls.43 Bh Pas. Kenie Talang PVC U 13,000.00 13,000.00 13,000.00
42 Ls.44 Bh Pas. Corong Talang PVC U 13,000.00 13,000.00 13,000.00
43 Ls.45 Bh Pas. Sarangan Stainless steel 25,000.00 25,000.00 25,000.00
44 Ls.46 Bh Step nosing/ plint tangga 12,000.00 12,000.00 12,000.00
45 Ls.47 m2 Pas. folding gate besi 450,000.00 450,000.00 450,000.00
46 Ls.48 set Pas. pintu aluminium uk. 70 cm lengkap 276,000.00 276,000.00 276,000.00
47 Ls.49 set Pas. pintu PVC uk. 70 cm lengkap 325,000.00 325,000.00 325,000.00

PEKERJAAN JALAN & JEMBATAN

1 E1.30 M2 PEMBERSIHAN DAMIJA 982.86 982.86


2 E1.33 M2 PENYIAPAN BADAN JALAN #REF! #REF!
3 E1.311a M3 GALIAN TANAH BIASA ( MANUAL) 39,250.00 39,250.00
4 E1.312a M3 GALIAN PADAS / BATUAN (MANUAL) 79,000.00 79,000.00
5 E1.313 M3 GALIAN PERKERASAN ASPAL(MANUAL) 104,800.00 104,800.00
6 E1.321a M3 URUGAN TANAH BIASA DARI HASIL GALIAN #REF! #REF!

41 / 51
PEMERINTAH KABUPATEN BANYUMAS
DINAS PEKERJAAN UMUM KAB. BANYUMAS
DAFTAR HARGA SATUAN PEKERJAAN
Jl.Jend. Gatot Subroto No.III-5 Telp.(0281) 637038
PURWOKERTO HSP
TAHUN 2007
HRG SATUAN (Rp)
NO KODE ANALIS SATUAN JENIS PEKERJAAN KATAGORI I KATAGORI II
SWAKELOLA
(Mudah) (Sulit)
7 E1.322 M3 URUGAN SIRTU #REF! #REF!
8 E1.321 M3 URUGAN TANAH BIASA #REF! #REF!
9 E1.511 M3 LAPIS PONDASI AGREGAT KELAS A #REF! #REF!
10 E1.512 M3 LAPIS PONDASI AGREGAT KELAS B #REF! #REF!
11 E1.521 M3 LAPIS PONDASI AGREGAT KELAS C #REF! #REF!
12 E1.611 LITER LAPIS RESAP PENGIKAT #REF! #REF!
13 E1.612 LITER LAPIS PEREKAT #REF! #REF!
14 E1.817a M3 LAPIS PENETRASI MACADAM (Leveling) #REF! #REF!
15 E1.631 M2 LATASIR ( SAND SHEET ) #REF! #REF!
16 E1.817b M2 LAPIS PENETRASI MACADAM SHEET #REF! #REF!
17 E1.635 M3 ASPHALT TREATED BASE (ATB) #REF! #REF!
18 E1.635a TON ASPHALT TREATED BASE LEVELING (ATBL) #REF! #REF!
19 E1.633 M2 LATASTON (HRS) #REF! #REF!
20 E1.716 M3 BETON K-125 #REF! #REF!
21 E1.711 M3 BETON K-250 #REF! #REF!
22 E1.714b M3 BETON K-350 #REF! #REF!
23 E1.712a M3 BETON CYCLOP #REF! #REF!
24 E1.713a M3 BETON STRUKTUR K-225 KANSTIN ( EKSPOS ) #REF! #REF!
25 E1.72 Kg. PENULANGAN / PEMBESIAN 15,125.00 16,225.00
26 E1.710 M2 ACUAN (Begisting) utk Jbt / gorong-gorong 67,900.00 66,450.00
27 E1.813 M2 PENGECATAN KAYU / BESI 28,973.00 29,141.00
28 E1.753 M3 BRONJONG (GABIONS) 353,625.00 372,125.00
29 E1.79 M3 PASANGAN BATU (MEKANIK) #REF! #REF!
30 E1.841 M2 MARKA JALAN THERMOPLASTIC 75,000.00 75,000.00
31 E1.715 M2 GROOVING 7,244.57 7,244.57
32 E1.847 BH PATOK KILOMETER #REF! #REF!
33 E1.846 BH PATOK HEKTOMETER #REF! #REF!
34 E1.723.4 M' TIANG PANCANG BETON #REF! #REF!
35 W.2 M2 Memasang Onderlaag tebal 15 cm 58,916.11 61,305.00
36 A.18 M3 Urugan pasir pasang 162,166.67 171,500.00
37 W.3 M2 Memasang Stenslaag tebal 6 cm 19,385.83 20,340.14
38 KPU.IVa M2 Pasang Paving Blok Natural 107,622.22 80,400.00
39 KPU.IVb M2 Pasang Paving Blok Warna 107,622.22 84,400.00
40 W.3.a M2 Memasang Stenslaag tebal 6 - 8 cm 28,394.44 29,550.00
41 A.19 M3 Urugan pasir Urug 162,166.67 171,500.00
42 W.3.a M2 Sokongon Jembatan (Bekisting)

Purwokerto, Februari 2007

KEPALA DINAS PEKERJAAN UMUM


KABUPATEN BANYUMAS
Yang Menjalankan Tugas,

Ir. DIDI RUDWIANTO, SH.M.Si


Pembina Tk.I
NIP. 500 091 045
Asekbang Sekda Kab. Banyumas

42 / 51
BESI BETON / Mild Steel Round Bars
SIZE WEIGHT WEIGHT/m1
6 mm - 12 M 2.66 Kg 0.22167 Kg
6.5 mm - 12 M 3.2 Kg 0.26667 Kg
7.5 mm - 12 M 4.4 Kg 0.36667 Kg
8 mm - 12 M 4.74 Kg 0.395 Kg
9 mm - 12 M 6 Kg 0.5 Kg
10 mm - 12 M 7.4 Kg 0.61667 Kg
11 mm - 12 M 8.95 Kg 0.74583 Kg
12 mm - 12 M 10.7 Kg 0.89167 Kg
13 mm - 12 M 12.6 Kg 1.05 Kg
14 mm - 12 M 14.5 Kg 1.20833 Kg
15 mm - 12 M 16.6 Kg 1.38333 Kg
16 mm - 12 M 19 Kg 1.58333 Kg
18 mm - 12 M 24 Kg 2 Kg
19 mm - 12 M 26.8 Kg 2.23333 Kg
21 mm - 12 M 32.6 Kg 2.71667 Kg
22 mm - 12 M 36.8 Kg 3.06667 Kg
24 mm - 12 M 42.6 Kg 3.55 Kg
25 mm - 12 M 46.24 Kg 3.85333 Kg
29 mm - 12 M 62.22 Kg 5.185 Kg
32 mm - 12 M 75.77 Kg 6.31417 Kg
35 mm - 12 M 90.63 Kg 7.5525 Kg
36 mm - 12 M 95.88 Kg 7.99 Kg

Prankuta. Doc
BESI BETONSPIRAL / Deformed Bars

SIZE WEIGHT CATATAN


D 10 mm - 12 M 7.4 Kg 0.6166666667
D 13 mm - 12 M 12.6 Kg 1.05
D 16 mm - 12 M 19 Kg 1.5833333333
D 19 mm - 12 M 26.8 Kg 2.2333333333
D 22 mm - 12 M 36.8 Kg 3.0666666667
D 25 mm - 12 M 46.8 Kg 3.9
D 29 mm - 12 M 62.22 Kg 5.185
D 32 mm - 12 M 75.77 Kg 6.3141666667
D 36 mm - 12 M 95.88 Kg 7.99
0
Prankuta. Doc
PEKERJAAN TAMBAH KURANG RUMAH BPK AGUS KARANGGUDE

RAB TOTAL .= Rp 700,684,261.41


RAB TENAGA .= Rp 130,000,000.00

PROSEN TENAGA .= RAB TENAGA X 100%


RAB TOTAL

.= Rp 130,000,000.00 X 100%
Rp 700,684,261.41

.= 18.553 %

RAB PEKERJAAN ATAP .= Rp 83,828,250.00


RAB TENAGA PEKERJAAN ATAP .= Rp 83.828.250.00 X 18,553 %
.= Rp 15,552,655.22

RENCANA DI RAB ================ RANGKA ATAP BAJA


REALISASI ================ 1. RANGKA ATAP BETON
2. DAK KAMAR BELAKANG

REALISASI PEAKSANAAN .= 7 MINGGU


.= Rp4,500,000 tenaga
Rp500,000 operasional santo, ARIF
.= Rp5,000,000 per minggu

.= 5 jt x 7 minggu
.= 35 jt

REALISASI .= Rp 35,000,000.00
RAB RENCANA TENAGA Rp 15,552,655.22 (-)
PEKERJAAN TAMBAH .= Rp 19,447,344.78

SEHINGGA KAMI MENGAJUKAN PEKERJAAN TAMBAH SEBESAR


Rp 19,447,344.78
PEKERJAAN TAMBAH KURANG KEDUA RUMAH BPK AGUS KARANGGUDE

RAB TOTAL .= Rp 700,684,261.41


RAB TENAGA .= Rp 130,000,000.00

PROSEN TENAGA .= RAB TENAGA X 100%


RAB TOTAL

.= Rp 130,000,000.00 X 100%
Rp 700,684,261.41

.= 18.553 %

RAB PEKERJAAN MELAMIN .= Rp 10,351,000.00


RAB TENAGA PEKERJAAN MELAMIN .= Rp10.351.000,00 X 18,553 %
.= Rp 1,920,421.03
PEKERJAAN TAMBAH KURANG KEDUA RUMAH BPK AGUS KARANGGUDE

RAB TOTAL .= Rp 700,684,261.41


RAB TENAGA .= Rp 130,000,000.00

PROSEN TENAGA .= RAB TENAGA X 100%


RAB TOTAL

.= Rp 130,000,000.00 X 100%
Rp 700,684,261.41

.= 18.553 %

RAB PEKERJAAN LISTRIK .= Rp 7,885,000.00


RAB TENAGA PEKERJAAN LISTRIK .= Rp7.885.000,00 X 18,553 %
.= Rp 1,462,904.05
Tahap Pertama Bayar Tenaga .= Rp 350,000.00
Sisa Anggaran Tenaga .= Rp 1,112,904.05
CASFLOW RUMAH BPK AGUS KARANGGUDE

JENIS PEKERJAAN PEMASUKAN PENGELUARAN

Kontrak Awal = Rp 130 jt


Pek Tambah = Rp 15 jt
Total = Rp 145 jt

Pemasukan s/d desember 2015 Rp 135,000,000.00


Pengeluaran s/d sabtu 30 jan 2016 Rp 148,188,500.00
pengeluaran sabtu 6 Feb 2016
* M 3 JA Rp 850,000.00
* Santo Rp 200,000.00

Pengeluaran sabtu 13 Feb 2016


* M 3 JA Rp 900,000.00
* Santo Rp 200,000.00

TOTAL Rp 135,000,000.00 Rp 150,338,500.00


DEVIASI Rp (15,338,500.00)
RENCANA ANGGARAN BIAYA (RAB)
PEKERJAAN TAMBAH KURANG KEDUA RUMAH PAK AGUS

NO URAIAN PEKERJAAN HARGA JML HARGA JML TOTAL


VOLUME SAT SATUAN ( Rp ) ( Rp )

1 Perubahan Rangka Atap Dari Baja ringan


menjadi Rangka Beton Bertulang (Sudah)

2 Penggantian Atap Jurai Pojok Utara-Timur, Penggantian Kayu, Sudah jadi, Bongkar Pasang
* Tukang , 2 orang 3 hari 3 Hari Rp 140,000.00 Rp 420,000.00

3 Pengetiran Rangka Atap


* Tenaga , 2 orang 3 hari 3 Hari Rp 110,000.00 Rp 330,000.00

4 Pengecatan Ulang Genteng, seminggu


Sabtu 16 januari 2016 6 Hari Rp 70,000.00 Rp 420,000.00

5 Pemasangan Kusen Taman Barat 1 Ls Rp 210,000.00 Rp 210,000.00


dan penambahan keramik dapur
(Digambar tidak ada)

6 Pemasangan Keramik Kolom Teras 2 muka 6 Hari Rp 70,000.00 Rp 420,000.00


* Sudah Jadi difinis
* Dibongkar lagi Ditambah keramiknya
(Digambar Tidak ada)

7 Pemasangan Keramik Bawah 2 Teras 6 Hari Rp 70,000.00 Rp 420,000.00


(Digambar tidak ada)

8 Pekerjaan Waterproofing Dak 1 Ls Rp 535,000.00 Rp 535,000.00


* Dak R Tamu = 2x3 = 6 m2
* Dak Teras Samping = 1.8 x 4 = 7.2 m2
* Dak Garasi = 1.5 x 3 = 4,5 m2
* Dak Kamar mandi belakang=2x5=10m2
* Dak Kamar Pembantu= 2x4 = 8 m2
Total = 35,7 m2
Dikerjakan 6 hari
Borongan Rp 15 rb/ m2 x 35,7 = Rp 535.000

9 Pas Plafon Dak Luar Kamr mandi dan 4 Hari Rp 70,000.00 Rp 280,000.00
Teras Ruang Tamu.
Gambar Expose

Rp 3,035,000.00 Rp 3,035,000.00
URAIAN
PEKERJAAN TAMBAH KURANG KEDUA RUMAH PAK AGUS

NO URAIAN PEKERJAAN KETERANGAN

1 Perubahan Rangka Atap Dari Baja ringan Sudah


menjadi Rangka Beton Bertulang (Sudah)

2 Penggantian Atap Jurai Pojok Utara-Timur, Penggantian Kayu, Sudah jadi, Bongkar Pasang
* Tukang , 2 orang 3 hari

3 Pengetiran Rangka Atap Jenis Pekerjaan Tidak Ada Di RAB


* Tenaga , 2 orang 3 hari

4 Pengecatan Ulang Genteng, seminggu Jenis Pekerjaan Tidak Ada Di RAB


Sabtu 16 januari 2016

5 Pemasangan Kusen Taman Barat Digambar Tidak Ada


dan penambahan keramik dapur
(Digambar tidak ada)

6 Pemasangan Keramik Kolom Teras 2 muka Digambar Tidak Ada


* Sudah Jadi difinis
* Dibongkar lagi Ditambah keramiknya
(Digambar Tidak ada)

7 Pemasangan Keramik Bawah 2 Teras Digambar Tidak Ada


(Digambar tidak ada)

8 Pekerjaan Waterproofing Dak Jenis Pekerjaan Tidak Ada Di RAB


* Dak R Tamu = 2x3 = 6 m2
* Dak Teras Samping = 1.8 x 4 = 7.2 m2
* Dak Garasi = 1.5 x 3 = 4,5 m2
* Dak Kamar mandi belakang=2x5=10m2
* Dak Kamar Pembantu= 2x4 = 8 m2
Total = 35,7 m2
Dikerjakan 6 hari
Borongan Rp 15 rb/ m2 x 35,7 = Rp 535.000

9 Pas Plafon Dak Luar Kamr mandi dan Digambar Tidak Ada
Teras Ruang Tamu.
Gambar Expose

10 Standar Pekerjaan Pengecatan Tembok dan Plafond adalah 3 Lapis


AH PAK AGUS

KETERANGAN

Sudah

gantian Kayu, Sudah jadi, Bongkar Pasang

Pekerjaan Tidak Ada Di RAB

Pekerjaan Tidak Ada Di RAB

mbar Tidak Ada

mbar Tidak Ada

mbar Tidak Ada

Pekerjaan Tidak Ada Di RAB

mbar Tidak Ada

Anda mungkin juga menyukai