OPNAME PEKERJAAN BORON

No. : /SBP-OPB/ / /2012


BOBOT BOBOT
NO PEKERJAAN BORONGAN
MG LL MG INI
Mandor : WONDO

Papan Bouwplank 100% 0%

Pekerjaan Pondasi Telapak


- Galian tanah 100% 0%
- Urugan tanah kembali + pemadatan 100% 0%
- Pasir urug bawah pondasi 10 cm 100% 0%
- Lantai kerja 5 cm 100% 0%
- Beton 100% 0%
- Bekisting pasangan batako 100% 0%
- Besi pondasi tapak 100% 0%

Pekerjaan Pondasi Batu Kali


- Galian tanah 100% 0%
- Urugan tanah kembali + pemadatan 100% 0%
- Pasangan batu kali 100% 0%
- Pasir urug bawah pondasi 10 cm 100% 0%

Pekerjaan Tie Beam / Sloof


- Beton K225 100% 0%
- Besi beton 100% 0%
- Bekisting 100% 0%

Struktur Kolom lantai dasar


- Beton K225 100% 0%
- Bekisting 100% 0%
- Besi beton 100% 0%

Struktur Balok + Janggutan Lantai Atas


- Beton K225 100% 0%
- Besi beton standard SNI 100% 0%
- Bekisting 100% 0%

Struktur Plat lantai Atas


- Beton K225 100% 0%
- Besi beton standard SNI 100% 0%
- Bekisting 100% 0%

Struktur Canopy Lantai Atas


- Beton K225 100% 0%
- Besi beton standard SNI 100% 0%
- Bekisting 100% 0%

Struktur Kolom lantai Atas


- Beton K225 100% 0%
- Bekisting 100% 0%
- Besi beton 100% 0%
Struktur Plat lantai bawah
- Pemadatan tanah 100% 0%
- Rollag bata teras 100% 0%
- Plastik cor 100% 0%
- Beton K225 Plat t = 8 cm 100% 0%
- Besi Wire Mesh M - 6 standard SNI ( 1 Lapis ) 100% 0%
- Bekisting 100% 0%

Struktur Balok + Janggutan Atap


- Beton K225 100% 0%
- Besi beton standard SNI 100% 0%
- Bekisting 100% 0%

Struktur Plat Atap


- Beton K225 100% 0%
- Besi beton standard SNI 100% 0%
- Bekisting 100% 0%

Struktur Canopy Atap


- Beton K225 100% 0%
- Besi beton standard SNI 100% 0%
- Bekisting 100% 0%

Pekerjaan Pagar Luar Depan dan belakang


Pekerjaan Pondasi Batu Kali
- Galian tanah 100% 0%
- Urugan tanah kembali + pemadatan 100% 0%
- Pasangan batu kali 100% 0%
- Pasir urug bawah pondasi 10 cm 100% 0%
Pekerjaan Tie Beam / Sloof, kolom praktis dan Ringbalk
- Beton K225 100% 0%
- Besi beton standard SNI 100% 0%
- Bekisting 100% 0%
Pekerjaan pasangan dinding bata top level + 0,60 m 100% 0%

Screeding + Kawat Ayam Lantai Atas


Dak dan canopy 0%
Screeding + Kawat Ayam Pelat Atap
Dak dan canopy 0%

PEKERJAAN DINDING + FINISHING


Pekerjaan Dinding Lantai - 1
Trasram pasangan bata , h = 30 cm 100% 0%
Pekerjaan pasangan dinding bata 100% 0%
Kolom praktis 11x11 cm 100% 0%
Balok latei termasuk Finishing openingnya. 100% 0%
Pekerjaan plesteran dinding + bawah tangga 20% 0%
Pekerjaan acian dinding + bawah tangga dengan MU 250 0% 0%
Pekerjaan plesteran + aci + tali air 2 cm pada dinding + 0% 0%
cat weathercoat `

Pekerjaan Dinding Lantai - 2


Trasram pasangan bata , h = 30 cm 0% 0%
Pekerjaan pasangan dinding bata 0% 50%
Kolom praktis 11x11 cm 0% 50%
Balok latei termasuk Finishing openingnya. 0% 0%
Pekerjaan plesteran dinding + bawah tangga 0% 0%
Pekerjaan acian dinding + bawah tangga dengan MU 250 0% 0%
Pekerjaan plesteran + aci + tali air 2 cm pada dinding + 0% 0%
cat weathercoat `

Struktur Tangga Utama


Beton K225 0% 0%
Besi beton standard SNI 0% 0%
Bekisting 0% 0%

Struktur Tangga Jemuran


Beton K225 0% 0%
Besi beton standard SNI 0% 0%
Bekisting 0% 0%

Disetujui Oleh :

PM
Halaman Dari :
Proyek xxxxxxxx RESIDENCE
Lokasi
Minggu Ke 17 - 18
Tanggal 28 MEI S/D 6 JUNI
ME PEKERJAAN BORONGAN
/SBP-OPB/ / /2012
QUANTITY
VOLUME HARGA SAT JUMLAH KETERANGAN
Mg Ini

60.48 - 7,500.00 - SUDAH TERBAYAR

21.60 - 25,000.00 - SUDAH TERBAYAR


14.88 - 7,000.00 - SUDAH TERBAYAR
0.96 - 9,500.00 - SUDAH TERBAYAR
0.34 - 80,000.00 - SUDAH TERBAYAR
1.33 - 100,000.00 - SUDAH TERBAYAR
4.36 - 20,000.00 - SUDAH TERBAYAR
147.63 - 1,080.00 - SUDAH TERBAYAR

76.94 - 18,000.00 - SUDAH TERBAYAR


13.67 - 7,000.00 - SUDAH TERBAYAR
39.98 - 75,000.00 - SUDAH TERBAYAR
12.12 - 9,500.00 - SUDAH TERBAYAR

10.13 - 100,000.00 - SUDAH TERBAYAR


1,049.70 - 1,080.00 - SUDAH TERBAYAR
84.82 - 30,000.00 - SUDAH TERBAYAR

47.68 - 100,000.00 - SUDAH TERBAYAR


1.16 - 30,000.00 - SUDAH TERBAYAR
1,403.89 - 1,080.00 - SUDAH TERBAYAR

13.26 - 100,000.00 - SUDAH TERBAYAR


1,764.13 - 1,080.00 - SUDAH TERBAYAR
136.97 - 30,000.00 - SUDAH TERBAYAR

- - 100,000.00 - SUDAH TERBAYAR


- - 1,080.00 - SUDAH TERBAYAR
- - 30,000.00 - SUDAH TERBAYAR

4.08 - 100,000.00 - SUDAH TERBAYAR


365.98 - 1,080.00 - SUDAH TERBAYAR
35.19 - 30,000.00 - SUDAH TERBAYAR

2.80 - 100,000.00 - SUDAH TERBAYAR


53.00 - 30,000.00 - SUDAH TERBAYAR
591.60 - 1,080.00 - SUDAH TERBAYAR

157.03 - 3,000.00 - SUDAH TERBAYAR


16.00 - 15,000.00 - SUDAH TERBAYAR
181.42 - 2,000.00 - SUDAH TERBAYAR
14.51 - 100,000.00 - SUDAH TERBAYAR
181.42 - 500.00 - SUDAH TERBAYAR
9.23 - 30,000.00 - SUDAH TERBAYAR

8.60 - 100,000.00 - SUDAH TERBAYAR


1,194.71 - 1,240.00 - SUDAH TERBAYAR
111.42 - 30,000.00 - SUDAH TERBAYAR

7.82 - 100,000.00 - SUDAH TERBAYAR


720.84 - 1,240.00 - SUDAH TERBAYAR
65.18 - 30,000.00 - SUDAH TERBAYAR

1.59 - 100,000.00 - SUDAH TERBAYAR


144.30 - 1,240.00 - SUDAH TERBAYAR
13.21 - 30,000.00 - SUDAH TERBAYAR

4.30 - 18,000.00 - SUDAH TERBAYAR


0.81 - 7,000.00 - SUDAH TERBAYAR
3.50 - 75,000.00 - SUDAH TERBAYAR
0.72 - 9,500.00 - SUDAH TERBAYAR

0.54 - 100,000.00 - SUDAH TERBAYAR


96.37 - 1,080.00 - SUDAH TERBAYAR
7.17 - 30,000.00 - SUDAH TERBAYAR
15.34 - 17,500.00 - SUDAH TERBAYAR

33.96 - 12,000.00 -
78.21 - 12,000.00 -

27.46 - 17,500.00 - SUDAH TERBAYAR


200.95 - 17,500.00 - SUDAH TERBAYAR
70.40 - 7,500.00 - SUDAH TERBAYAR
8.40 - 9,000.00 - SUDAH TERBAYAR
456.82 - 15,000.00 - SUDAH TERBAYAR
297.56 - 5,000.00 -
7.62 - 24,000.00 -

27.46 - 17,500.00 -
200.95 100.48 17,500.00 1,758,312.50
70.40 35.20 21,000.00 739,200.00
8.40 - 9,000.00 -
456.82 - 12,500.00 -
297.56 - 19,500.00 -
7.62 - 6,500.00 -

1.70 - 100,000.00 -
305.15 - 1,080.00 -
10.73 - 30,000.00 -

1.26 - 100,000.00 -
150.01 - 1,080.00 -
5.43 - 30,000.00 -

TOTAL OPNAME : 2,497,512.50


Diperiksa Oleh : Dibuat Oleh :

Site Engineer Spv. Sipil


OPNAME PEKERJAAN BORONGAN
No. : /SBP-OPB/ / /2012
BOBOT BOBOT
NO PEKERJAAN BORONGAN VOLUME
MG LL MG INI
Mandor : WONDO
ARUNDAYA Blok B 16

Papan Bouwplank 100% 0% 60.48

Pekerjaan Pondasi Telapak


- Galian tanah 100% 0% 21.60
- Urugan tanah kembali + pemadatan 100% 0% 14.88
- Pasir urug bawah pondasi 10 cm 100% 0% 0.96
- Lantai kerja 5 cm 100% 0% 0.34
- Beton 100% 0% 1.33
- Bekisting pasangan batako 100% 0% 4.36
- Besi pondasi tapak 100% 0% 140.60

Pekerjaan Pondasi Batu Kali


- Galian tanah 100% 0% 76.94
- Urugan tanah kembali + pemadatan 100% 0% 13.67
- Pasangan batu kali 100% 0% 39.98
- Pasir urug bawah pondasi 10 cm 100% 0% 12.12

Pekerjaan Tie Beam / Sloof


- Beton K225 100% 0% 10.13
- Besi beton 100% 0% 1,049.70
- Bekisting 100% 0% 84.82

Struktur Kolom lantai dasar


- Beton K225 100% 0% 47.68
- Bekisting 100% 0% 1.16
- Besi beton 100% 0% 1,403.89

Struktur Balok + Janggutan Lantai Atas


- Beton K225 100% 0% -
- Besi beton standard SNI 100% 0% -
- Bekisting 100% 0% -
Struktur Plat lantai Atas
- Beton K225 100% 0% -
- Besi beton standard SNI 100% 0% -
- Bekisting 100% 0% -

Struktur Canopy Lantai Atas


- Beton K225 50% 0% 4.08
- Besi beton standard SNI 50% 0% 365.98
- Bekisting 50% 0% 35.19

Struktur Kolom lantai Atas


- Beton K225 100% 0% -
- Bekisting 100% 0% -
- Besi beton 100% 0% -

Struktur Plat lantai bawah


- Pemadatan tanah 100% 0% 157.03
- Rollag bata teras 100% 0% 16.00
- Plastik cor 100% 0% 181.42
- Beton K225 Plat t = 8 cm 100% 0% 14.51
- Besi Wire Mesh M - 6 standard SNI ( 1 Lapis ) 100% 0% 181.42
- Bekisting 100% 0% 9.23

Struktur Balok + Janggutan Atap


- Beton K225 0% 100% 8.60
- Besi beton standard SNI 100% 0% 1,194.71
- Bekisting 100% 0% 111.42

Struktur Plat Atap


- Beton K225 0% 100% 7.82
- Besi beton standard SNI 100% 0% 720.84
- Bekisting 100% 0% 65.18

Struktur Canopy Atap


- Beton K225 0% 100% 1.59
- Besi beton standard SNI 50% 50% 144.30
- Bekisting 50% 50% 13.21

Pekerjaan Pagar Luar Depan dan belakang


Pekerjaan Pondasi Batu Kali
- Galian tanah 100% 0% 4.30
- Urugan tanah kembali + pemadatan 100% 0% 0.81
- Pasangan batu kali 100% 0% 3.50
- Pasir urug bawah pondasi 10 cm 100% 0% 0.72
Pekerjaan Tie Beam / Sloof, kolom praktis dan Ringbalk
- Beton K225 100% 0% 0.54
- Besi beton standard SNI 100% 0% 96.37
- Bekisting 100% 0% 7.17
Pekerjaan pasangan dinding bata top level + 0,60 m 100% 0% 15.34

Screeding + Kawat Ayam Lantai Atas


Dak dan canopy 33.96
Screeding + Kawat Ayam Pelat Atap
Dak dan canopy 0% 0% 78.21

PEKERJAAN DINDING + FINISHING


Pekerjaan Dinding Lantai - 1
Trasram pasangan bata , h = 30 cm 75% 0% 27.46
Pekerjaan pasangan dinding bata 25% 25% 200.95
Kolom praktis 11x11 cm 25% 25% 70.40
Balok latei termasuk Finishing openingnya. 0% 0% 8.40
Pekerjaan plesteran dinding + bawah tangga 20% 0% 456.82
Pekerjaan acian dinding + bawah tangga dengan MU 250 0% 0% 297.56
Pekerjaan plesteran + aci + tali air 2 cm pada dinding + 0% 0% 7.62
cat weathercoat ` `

Struktur Tangga Utama


Beton K225 1.70
Besi beton standard SNI 305.15
Bekisting 10.73

Struktur Tangga Jemuran


Beton K225 1.26
Besi beton standard SNI 150.01
Bekisting 5.43

Disetujui Oleh :

PM
Halaman Dari :
Proyek xxxxxxxx RESIDENCE
Lokasi
Minggu Ke 17 - 18
Tanggal 28 MEI S/D 6 JUNI
JAAN BORONGAN
OPB/ / /2012
QUANTITY
HARGA SAT JUMLAH KETERANGAN
Mg Ini

- 7,500.00 - SUDAH TERBAYAR

- 25,000.00 - SUDAH TERBAYAR


- 7,000.00 - SUDAH TERBAYAR
- 9,500.00 - SUDAH TERBAYAR
- 80,000.00 - SUDAH TERBAYAR
- 100,000.00 - SUDAH TERBAYAR
- 20,000.00 - SUDAH TERBAYAR
- 1,080.00 - SUDAH TERBAYAR

- 18,000.00 - SUDAH TERBAYAR


- 7,000.00 - SUDAH TERBAYAR
- 75,000.00 - SUDAH TERBAYAR
- 9,500.00 - SUDAH TERBAYAR

- 100,000.00 - SUDAH TERBAYAR


- 1,080.00 - SUDAH TERBAYAR
- 30,000.00 - SUDAH TERBAYAR

- 100,000.00 - SUDAH TERBAYAR


- 30,000.00 - SUDAH TERBAYAR
- 1,080.00 - SUDAH TERBAYAR

- 100,000.00 - SUDAH TERBAYAR


- 1,080.00 - SUDAH TERBAYAR
- 30,000.00 - SUDAH TERBAYAR
- 100,000.00 - SUDAH TERBAYAR
- 1,080.00 - SUDAH TERBAYAR
- 30,000.00 - SUDAH TERBAYAR

- 100,000.00 - SUDAH TERBAYAR


- 1,080.00 - SUDAH TERBAYAR
- 30,000.00 - SUDAH TERBAYAR

- 100,000.00 - SUDAH TERBAYAR


- 30,000.00 - SUDAH TERBAYAR
- 1,080.00 - SUDAH TERBAYAR

- 3,000.00 - SUDAH TERBAYAR


- 15,000.00 - SUDAH TERBAYAR
- 2,000.00 - SUDAH TERBAYAR
- 100,000.00 - SUDAH TERBAYAR
- 500.00 - SUDAH TERBAYAR
- 30,000.00 - SUDAH TERBAYAR

8.60 100,000.00 860,200.00


- 1,240.00 - SUDAH TERBAYAR
- 30,000.00 - SUDAH TERBAYAR

7.82 100,000.00 782,100.00


- 1,240.00 - SUDAH TERBAYAR
- 30,000.00 - SUDAH TERBAYAR

1.59 100,000.00 158,568.00


72.15 1,240.00 89,464.07
6.61 30,000.00 198,210.00

- 18,000.00 - SUDAH TERBAYAR


- 7,000.00 - SUDAH TERBAYAR
- 75,000.00 - SUDAH TERBAYAR
- 9,500.00 - SUDAH TERBAYAR
- 100,000.00 - SUDAH TERBAYAR
- 1,080.00 - SUDAH TERBAYAR
- 30,000.00 - SUDAH TERBAYAR
- 17,500.00 - SUDAH TERBAYAR

- 12,000.00 -

- 12,000.00 -

- 17,500.00 - SUDAH TERBAYAR


50.24 17,500.00 879,156.25
17.60 7,500.00 132,000.00
- 9,000.00 - SUDAH TERBAYAR
- 15,000.00 - SUDAH TERBAYAR
- 5,000.00 - SUDAH TERBAYAR
- 24,000.00 - SUDAH TERBAYAR

- 100,000.00 -
- 1,080.00 -
- 30,000.00 -
-

- 100,000.00 -
- 1,080.00 -
- 30,000.00 -

TOTAL OPNAME : 3,099,698.32


Diperiksa Oleh : Dibuat Oleh :

Site Engineer Spv. Sipil


OPNAME PEKERJAAN BORONGAN
No. : /SBP-OPB/ / /2012
BOBOT BOBOT
NO PEKERJAAN BORONGAN VOLUME
MG LL MG INI
Mandor : SAJIO
ARUNDAYA Blok B 15

Papan Bouwplank 100% 0% 60.48

Pekerjaan Pondasi Telapak


- Galian tanah 100% 0% 21.60
- Urugan tanah kembali + pemadatan 100% 0% 14.88
- Pasir urug bawah pondasi 10 cm 100% 0% 0.96
- Lantai kerja 5 cm 100% 0% 0.34
- Beton 100% 0% 1.33
- Bekisting pasangan batako 100% 0% 4.36
- Besi pondasi tapak 100% 0% 140.60

Pekerjaan Pondasi Batu Kali


- Galian tanah 100% 0% 76.94
- Urugan tanah kembali + pemadatan 100% 0% 13.67
- Pasangan batu kali 100% 0% 39.98
- Pasir urug bawah pondasi 10 cm 100% 0% 12.12

Pekerjaan Tie Beam / Sloof


- Beton K225 100% 0% 10.13
- Besi beton 100% 0% 1,049.70
- Bekisting 100% 0% 84.82

Struktur Kolom lantai dasar


- Beton K225 100% 0% 47.68
- Bekisting 100% 0% 1.16
- Besi beton 100% 0% 1,403.89

Struktur Balok + Janggutan Lantai Atas


- Beton K225 100% 0% -
- Besi beton standard SNI 100% 0% -
- Bekisting 100% 0% -
Struktur Plat lantai Atas
- Beton K225 100% 0% -
- Besi beton standard SNI 100% 0% -
- Bekisting 100% 0% -

Struktur Canopy Lantai Atas


- Beton K225 50% 0% 4.08
- Besi beton standard SNI 50% 0% 365.98
- Bekisting 50% 0% 35.19

Struktur Kolom lantai Atas


- Beton K225 100% 0% -
- Bekisting 100% 0% -
- Besi beton 100% 0% -

Struktur Plat lantai bawah


- Pemadatan tanah 100% 0% 157.03
- Rollag bata teras 100% 0% 16.00
- Plastik cor 100% 0% 181.42
- Beton K225 Plat t = 8 cm 100% 0% 14.51
- Besi Wire Mesh M - 6 standard SNI ( 1 Lapis ) 100% 0% 181.42
- Bekisting 100% 0% 9.23

Struktur Balok + Janggutan Atap


- Beton K225 0% 0% 8.60
- Besi beton standard SNI 0% 100% 1,194.71
- Bekisting 20% 100% 111.42

Struktur Plat Atap


- Beton K225 0% 0% 7.82
- Besi beton standard SNI 0% 100% 720.84
- Bekisting 0% 100% 65.18

Struktur Canopy Atap


- Beton K225 0% 0% 1.59
- Besi beton standard SNI 0% 100% 144.30
- Bekisting 0% 100% 13.21

Pekerjaan Pagar Luar Depan dan belakang


Pekerjaan Pondasi Batu Kali
- Galian tanah 0% 0% 4.30
- Urugan tanah kembali + pemadatan 0% 0% 0.81
- Pasangan batu kali 0% 0% 3.50
- Pasir urug bawah pondasi 10 cm 0% 0% 0.72
Pekerjaan Tie Beam / Sloof, kolom praktis dan Ringbalk
- Beton K225 0% 0% 0.54
- Besi beton standard SNI 0% 0% 96.37
- Bekisting 0% 0% 7.17
Pekerjaan pasangan dinding bata top level + 0,60 m 0% 0% 15.34

Screeding + Kawat Ayam Lantai Atas


Dak dan canopy 0% 0% 33.96
Screeding + Kawat Ayam Pelat Atap
Dak dan canopy 0% 0% 78.21

PEKERJAAN DINDING + FINISHING


Pekerjaan Dinding Lantai - 1
Trasram pasangan bata , h = 30 cm 0% 0% 27.46
Pekerjaan pasangan dinding bata 0% 20% 200.95
Kolom praktis 11x11 cm 0% 0% 70.40
Balok latei termasuk Finishing openingnya. 0% 0% 8.40
Pekerjaan plesteran dinding + bawah tangga 0% 0% 456.82
Pekerjaan acian dinding + bawah tangga dengan MU 250 0% 0% 297.56
Pekerjaan plesteran + aci + tali air 2 cm pada dinding + 0% 0% 7.62
cat weathercoat ` `

Struktur Tangga Utama


Beton K225 0% 0% 1.70
Besi beton standard SNI 0% 0% 305.15
Bekisting 0% 0% 10.73

Struktur Tangga Jemuran


Beton K225 0% 0% 1.26
Besi beton standard SNI 0% 0% 150.01
Bekisting 0% 0% 5.43

Disetujui Oleh :

PM
Halaman Dari :
Proyek xxxxxxx RESIDENCE
Lokasi
Minggu Ke 17 - 18
Tanggal 28 MEI S/D 6 JUNI
JAAN BORONGAN
PB/ / /2012
QUANTITY
HARGA SAT JUMLAH KETERANGAN
Mg Ini

- 7,500.00 - SUDAH TERBAYAR

- 25,000.00 - SUDAH TERBAYAR


- 7,000.00 - SUDAH TERBAYAR
- 9,500.00 - SUDAH TERBAYAR
- 80,000.00 - SUDAH TERBAYAR
- 100,000.00 - SUDAH TERBAYAR
- 20,000.00 - SUDAH TERBAYAR
- 1,080.00 - SUDAH TERBAYAR

- 18,000.00 - SUDAH TERBAYAR


- 7,000.00 - SUDAH TERBAYAR
- 75,000.00 - SUDAH TERBAYAR
- 9,500.00 - SUDAH TERBAYAR

- 100,000.00 - SUDAH TERBAYAR


- 1,080.00 - SUDAH TERBAYAR
- 30,000.00 - SUDAH TERBAYAR

- 100,000.00 - SUDAH TERBAYAR


- 30,000.00 - SUDAH TERBAYAR
- 1,080.00 - SUDAH TERBAYAR

- 100,000.00 - SUDAH TERBAYAR


- 1,080.00 - SUDAH TERBAYAR
- 30,000.00 - SUDAH TERBAYAR
- 100,000.00 - SUDAH TERBAYAR
- 1,080.00 - SUDAH TERBAYAR
- 30,000.00 - SUDAH TERBAYAR

- 100,000.00 - SUDAH TERBAYAR


- 1,080.00 - SUDAH TERBAYAR
- 30,000.00 - SUDAH TERBAYAR

- 100,000.00 - SUDAH TERBAYAR


- 30,000.00 - SUDAH TERBAYAR
- 1,080.00 - SUDAH TERBAYAR

- 3,000.00 - SUDAH TERBAYAR


- 15,000.00 - SUDAH TERBAYAR
- 2,000.00 - SUDAH TERBAYAR
- 100,000.00 - SUDAH TERBAYAR
- 500.00 - SUDAH TERBAYAR
- 30,000.00 - SUDAH TERBAYAR

- 100,000.00 -
1,194.71 1,240.00 1,481,446.07
111.42 30,000.00 3,342,600.00

- 100,000.00 -
720.84 1,240.00 893,836.02
65.18 30,000.00 1,955,250.00

- 100,000.00 -
144.30 1,240.00 178,928.13
13.21 30,000.00 396,420.00

- 18,000.00 -
- 7,000.00 -
- 75,000.00 -
- 9,500.00 -
- 100,000.00 -
- 1,080.00 -
- 30,000.00 -
- 17,500.00 -

- 12,000.00 -

- 12,000.00 -

- 17,500.00 -
40.19 17,500.00 703,325.00
- 7,500.00 -
- 9,000.00 -
- 15,000.00 -
- 5,000.00 -
- 24,000.00 -

- 100,000.00 -
- 1,080.00 -
- 30,000.00 -

- 100,000.00 -
- 1,080.00 -
- 30,000.00 -

TOTAL OPNAME : 8,951,805.22


Diperiksa Oleh : Dibuat Oleh :

Site Engineer Spv. Sipil


OPNAME PEKERJAAN BORONGAN
No. : /SBP-OPB/ / /2012
BOBOT BOBOT
NO PEKERJAAN BORONGAN VOLUME
MG LL MG INI
Mandor : PARNO
ARUNDAYA Blok B 12

Papan Bouwplank 100% 0% 60.48

Pekerjaan Pondasi Telapak


- Galian tanah 100% 0% 21.60
- Urugan tanah kembali + pemadatan 100% 0% 14.88
- Pasir urug bawah pondasi 10 cm 100% 0% 0.96
- Lantai kerja 5 cm 100% 0% 0.34
- Beton 100% 0% 1.33
- Bekisting pasangan batako 100% 0% 4.36
- Besi pondasi tapak 100% 0% 140.60

Pekerjaan Pondasi Batu Kali


- Galian tanah 100% 0% 76.94
- Urugan tanah kembali + pemadatan 100% 0% 13.67
- Pasangan batu kali 100% 0% 39.98
- Pasir urug bawah pondasi 10 cm 100% 0% 12.12

Pekerjaan Tie Beam / Sloof


- Beton K225 100% 0% 10.13
- Besi beton 100% 0% 1,049.70
- Bekisting 100% 0% 84.82

Struktur Kolom lantai dasar


- Beton K225 100% 0% 47.68
- Bekisting 100% 0% 1.16
- Besi beton 100% 0% 1,403.89

Struktur Balok + Janggutan Lantai Atas


- Beton K225 100% 0% -
- Besi beton standard SNI 100% 0% -
- Bekisting 100% 0% -
Struktur Plat lantai Atas
- Beton K225 100% 0% -
- Besi beton standard SNI 100% 0% -
- Bekisting 100% 0% -

Struktur Canopy Lantai Atas


- Beton K225 50% 0% 4.08
- Besi beton standard SNI 50% 0% 365.98
- Bekisting 50% 0% 35.19

Struktur Kolom lantai Atas


- Beton K225 100% 0% -
- Bekisting 100% 0% -
- Besi beton 100% 0% -

Struktur Plat lantai bawah


- Pemadatan tanah 0% 100% 157.03
- Rollag bata teras 0% 100% 16.00
- Plastik cor 0% 100% 181.42
- Beton K225 Plat t = 8 cm 0% 100% 14.51
- Besi Wire Mesh M - 6 standard SNI ( 1 Lapis ) 0% 100% 181.42
- Bekisting 0% 100% 9.23

Struktur Balok + Janggutan Atap


- Beton K225 100% 0% 8.60
- Besi beton standard SNI 100% 0% 1,194.71
- Bekisting 100% 0% 111.42

Struktur Plat Atap


- Beton K225 100% 0% 7.82
- Besi beton standard SNI 100% 0% 720.84
- Bekisting 100% 0% 65.18

Struktur Canopy Atap


- Beton K225 0% 100% 1.59
- Besi beton standard SNI 0% 0% 144.30
- Bekisting 0% 0% 13.21

Pekerjaan Pagar Luar Depan dan belakang


Pekerjaan Pondasi Batu Kali
- Galian tanah 0% 0% 4.30
- Urugan tanah kembali + pemadatan 0% 0% 0.81
- Pasangan batu kali 0% 0% 3.50
- Pasir urug bawah pondasi 10 cm 0% 0% 0.72
Pekerjaan Tie Beam / Sloof, kolom praktis dan Ringbalk
- Beton K225 0% 0% 0.54
- Besi beton standard SNI 0% 0% 96.37
- Bekisting 0% 0% 7.17
Pekerjaan pasangan dinding bata top level + 0,60 m 0% 0% 15.34

Screeding + Kawat Ayam Lantai Atas


Dak dan canopy 0% 0% 33.96
Screeding + Kawat Ayam Pelat Atap
Dak dan canopy 0% 0% 78.21

PEKERJAAN DINDING + FINISHING


Pekerjaan Dinding Lantai - 1
Trasram pasangan bata , h = 30 cm 0% 0% 27.46
Pekerjaan pasangan dinding bata 0% 35% 200.95
Kolom praktis 11x11 cm 0% 35% 70.40
Balok latei termasuk Finishing openingnya. 0% 0% 8.40
Pekerjaan plesteran dinding + bawah tangga 0% 0% 456.82
Pekerjaan acian dinding + bawah tangga dengan MU 250 0% 0% 297.56
Pekerjaan plesteran + aci + tali air 2 cm pada dinding + 0% 0% 7.62
cat weathercoat ` `

Struktur Tangga Utama


Beton K225 0% 0% 1.70
Besi beton standard SNI 0% 0% 305.15
Bekisting 0% 0% 10.73

Struktur Tangga Jemuran


Beton K225 0% 0% 1.26
Besi beton standard SNI 0% 0% 150.01
Bekisting 0% 0% 5.43

Disetujui Oleh :

PM
Halaman Dari :
Proyek xxxxxxx RESIDENCE
Lokasi
Minggu Ke 17 - 18
Tanggal 28 MEI S/D 6 JUNI
JAAN BORONGAN
OPB/ / /2012
QUANTITY
HARGA SAT JUMLAH KETERANGAN
Mg Ini

- 7,500.00 - SUDAH TERBAYAR

- 25,000.00 - SUDAH TERBAYAR


- 7,000.00 - SUDAH TERBAYAR
- 9,500.00 - SUDAH TERBAYAR
- 80,000.00 - SUDAH TERBAYAR
- 100,000.00 - SUDAH TERBAYAR
- 20,000.00 - SUDAH TERBAYAR
- 1,080.00 - SUDAH TERBAYAR

- 18,000.00 - SUDAH TERBAYAR


- 7,000.00 - SUDAH TERBAYAR
- 75,000.00 - SUDAH TERBAYAR
- 9,500.00 - SUDAH TERBAYAR

- 100,000.00 - SUDAH TERBAYAR


- 1,080.00 - SUDAH TERBAYAR
- 30,000.00 - SUDAH TERBAYAR

- 100,000.00 - SUDAH TERBAYAR


- 30,000.00 - SUDAH TERBAYAR
- 1,080.00 - SUDAH TERBAYAR

- 100,000.00 - SUDAH TERBAYAR


- 1,080.00 - SUDAH TERBAYAR
- 30,000.00 - SUDAH TERBAYAR
- 100,000.00 - SUDAH TERBAYAR
- 1,080.00 - SUDAH TERBAYAR
- 30,000.00 - SUDAH TERBAYAR

- 100,000.00 - SUDAH TERBAYAR


- 1,080.00 - SUDAH TERBAYAR
- 30,000.00 - SUDAH TERBAYAR

- 100,000.00 - SUDAH TERBAYAR


- 30,000.00 - SUDAH TERBAYAR
- 1,080.00 - SUDAH TERBAYAR

157.03 3,000.00 471,090.00 SUDAH TERBAYAR


16.00 15,000.00 240,000.00 SUDAH TERBAYAR
181.42 2,000.00 362,840.00 SUDAH TERBAYAR
14.51 100,000.00 1,451,360.00 SUDAH TERBAYAR
181.42 500.00 90,710.00 SUDAH TERBAYAR
9.23 30,000.00 276,900.00 SUDAH TERBAYAR

- 100,000.00 - SUDAH TERBAYAR


- 1,240.00 - SUDAH TERBAYAR
- 30,000.00 - SUDAH TERBAYAR

- 100,000.00 - SUDAH TERBAYAR


- 1,240.00 - SUDAH TERBAYAR
- 30,000.00 - SUDAH TERBAYAR

1.59 100,000.00 158,568.00


- 1,240.00 - SUDAH TERBAYAR
- 30,000.00 - SUDAH TERBAYAR

- 18,000.00 -
- 7,000.00 -
- 75,000.00 -
- 9,500.00 -
- 100,000.00 -
- 1,080.00 -
- 30,000.00 -
- 17,500.00 -

- 12,000.00 -

- 12,000.00 -

- 17,500.00 -
70.33 17,500.00 1,230,818.75
24.64 7,500.00 184,800.00
- 9,000.00 -
- 15,000.00 -
- 5,000.00 -
- 24,000.00 -

- 100,000.00 -
- 1,080.00 -
- 30,000.00 -

- 100,000.00 -
- 1,080.00 -
- 30,000.00 -

TOTAL OPNAME : 4,467,086.75


Diperiksa Oleh : Dibuat Oleh :

Site Engineer Spv. Sipil


OPNAME PEKERJAAN BORONGAN
No. : /SBP-OPB/ / /2012
BOBOT BOBOT
NO PEKERJAAN BORONGAN VOLUME
MG LL MG INI
Mandor : SAJIO
ARUNDAYA Blok B 11

Papan Bouwplank 100% 0% 60.48

Pekerjaan Pondasi Telapak


- Galian tanah 100% 0% 21.60
- Urugan tanah kembali + pemadatan 100% 0% 14.88
- Pasir urug bawah pondasi 10 cm 100% 0% 0.96
- Lantai kerja 5 cm 100% 0% 0.34
- Beton 100% 0% 1.33
- Bekisting pasangan batako 100% 0% 4.36
- Besi pondasi tapak 100% 0% 140.60

Pekerjaan Pondasi Batu Kali


- Galian tanah 100% 0% 76.94
- Urugan tanah kembali + pemadatan 100% 0% 13.67
- Pasangan batu kali 100% 0% 39.98
- Pasir urug bawah pondasi 10 cm 100% 0% 12.12

Pekerjaan Tie Beam / Sloof


- Beton K225 100% 0% 10.13
- Besi beton 100% 0% 1,049.70
- Bekisting 100% 0% 84.82

Struktur Kolom lantai dasar


- Beton K225 100% 0% 47.68
- Bekisting 100% 0% 1.16
- Besi beton 100% 0% 1,403.89

Struktur Balok + Janggutan Lantai Atas


- Beton K225 100% 0% -
- Besi beton standard SNI 100% 0% -
- Bekisting 100% 0% -
Struktur Plat lantai Atas
- Beton K225 100% 0% -
- Besi beton standard SNI 100% 0% -
- Bekisting 100% 0% -

Struktur Canopy Lantai Atas


- Beton K225 50% 0% 4.08
- Besi beton standard SNI 50% 0% 365.98
- Bekisting 50% 0% 35.19

Struktur Kolom lantai Atas


- Beton K225 100% 0% -
- Bekisting 100% 0% -
- Besi beton 100% 0% -

Struktur Plat lantai bawah


- Pemadatan tanah 100% 0% 157.03
- Rollag bata teras 100% 0% 16.00
- Plastik cor 100% 0% 181.42
- Beton K225 Plat t = 8 cm 100% 0% 14.51
- Besi Wire Mesh M - 6 standard SNI ( 1 Lapis ) 100% 0% 181.42
- Bekisting 100% 0% 9.23

Struktur Balok + Janggutan Atap


- Beton K225 0% 0% 8.60
- Besi beton standard SNI 0% 50% 1,194.71
- Bekisting 20% 50% 111.42

Struktur Plat Atap


- Beton K225 0% 0% 7.82
- Besi beton standard SNI 25% 10% 720.84
- Bekisting 25% 10% 65.18

Struktur Canopy Atap


- Beton K225 0% 0% 1.59
- Besi beton standard SNI 25% 5% 144.30
- Bekisting 25% 5% 13.21

Pekerjaan Pagar Luar Depan dan belakang


Pekerjaan Pondasi Batu Kali
- Galian tanah 0% 0% 4.30
- Urugan tanah kembali + pemadatan 0% 0% 0.81
- Pasangan batu kali 0% 0% 3.50
- Pasir urug bawah pondasi 10 cm 0% 0% 0.72
Pekerjaan Tie Beam / Sloof, kolom praktis dan Ringbalk
- Beton K225 0% 0% 0.54
- Besi beton standard SNI 0% 0% 96.37
- Bekisting 0% 0% 7.17
Pekerjaan pasangan dinding bata top level + 0,60 m 0% 0% 15.34

Screeding + Kawat Ayam Lantai Atas


Dak dan canopy 33.96
Screeding + Kawat Ayam Pelat Atap
Dak dan canopy 0% 0% 78.21

PEKERJAAN DINDING + FINISHING


Pekerjaan Dinding Lantai - 1
Trasram pasangan bata , h = 30 cm 0% 0% 27.46
Pekerjaan pasangan dinding bata 0% 25% 200.95
Kolom praktis 11x11 cm 0% 25% 70.40
Balok latei termasuk Finishing openingnya. 0% 0% 8.40
Pekerjaan plesteran dinding + bawah tangga 0% 0% 456.82
Pekerjaan acian dinding + bawah tangga dengan MU 250 0% 0% 297.56
Pekerjaan plesteran + aci + tali air 2 cm pada dinding + 0% 0% 7.62
cat weathercoat `

Struktur Tangga Utama


Beton K225 0% 0% 1.70
Besi beton standard SNI 0% 0% 305.15
Bekisting 0% 0% 10.73

Struktur Tangga Jemuran


Beton K225 0% 0% 1.26
Besi beton standard SNI 0% 0% 150.01
Bekisting 0% 0% 5.43

Disetujui Oleh :

PM
Halaman Dari :
Proyek xxxxxx RESIDENCE
Lokasi
Minggu Ke 19 - 20
Tanggal 14 juni s/d 20 juni 2012
JAAN BORONGAN
PB/ / /2012
QUANTITY
HARGA SAT JUMLAH KETERANGAN
Mg Ini

- 7,500.00 - SUDAH TERBAYAR

- 25,000.00 - SUDAH TERBAYAR


- 7,000.00 - SUDAH TERBAYAR
- 9,500.00 - SUDAH TERBAYAR
- 80,000.00 - SUDAH TERBAYAR
- 100,000.00 - SUDAH TERBAYAR
- 20,000.00 - SUDAH TERBAYAR
- 1,080.00 - SUDAH TERBAYAR

- 18,000.00 - SUDAH TERBAYAR


- 7,000.00 - SUDAH TERBAYAR
- 75,000.00 - SUDAH TERBAYAR
- 9,500.00 - SUDAH TERBAYAR

- 100,000.00 - SUDAH TERBAYAR


- 1,080.00 - SUDAH TERBAYAR
- 30,000.00 - SUDAH TERBAYAR

- 100,000.00 - SUDAH TERBAYAR


- 30,000.00 - SUDAH TERBAYAR
- 1,080.00 - SUDAH TERBAYAR

- 100,000.00 - SUDAH TERBAYAR


- 1,080.00 - SUDAH TERBAYAR
- 30,000.00 - SUDAH TERBAYAR
- 100,000.00 - SUDAH TERBAYAR
- 1,080.00 - SUDAH TERBAYAR
- 30,000.00 - SUDAH TERBAYAR

- 100,000.00 - SUDAH TERBAYAR


- 1,080.00 - SUDAH TERBAYAR
- 30,000.00 - SUDAH TERBAYAR

- 100,000.00 - SUDAH TERBAYAR


- 30,000.00 - SUDAH TERBAYAR
- 1,080.00 - SUDAH TERBAYAR

- 3,000.00 - SUDAH TERBAYAR


- 15,000.00 - SUDAH TERBAYAR
- 2,000.00 - SUDAH TERBAYAR
- 100,000.00 - SUDAH TERBAYAR
- 500.00 - SUDAH TERBAYAR
- 30,000.00 - SUDAH TERBAYAR

- 100,000.00 -
597.36 1,240.00 740,723.03
55.71 30,000.00 1,671,300.00

- 100,000.00 -
72.08 1,240.00 89,383.60
6.52 30,000.00 195,525.00

- 100,000.00 -
7.21 1,240.00 8,946.41
0.66 30,000.00 19,821.00

- 18,000.00 -
- 7,000.00 -
- 75,000.00 -
- 9,500.00 -
- 100,000.00 -
- 1,080.00 -
- 30,000.00 -
-

- 12,000.00 -

- 12,000.00 -

- 17,500.00 -
50.24 17,500.00 879,156.25
17.60 7,500.00 132,000.00
- 9,000.00 -
- 15,000.00 -
- 5,000.00 -
- 24,000.00 -

- 100,000.00 -
- 1,080.00 -
- 30,000.00 -

- 100,000.00 -
- 1,080.00 -
- 30,000.00 -

TOTAL OPNAME : 3,736,855.29


Diperiksa Oleh : Dibuat Oleh :

Site Engineer Spv. Sipil


HARGA PENAWARAN UPAH BORONGAN
Proyek : Pembangunan Rumah Masal xxxxxx Residence
Tanggal : 21 Desember 2011

No. URAIAN PEKERJAAN UNIT

I PEKERJAAN PERSIAPAN
1 Papan Bouwplank m'

II. PEKERJAAN PONDASI & STRUKTUR


II.A Pekerjaan Tanah & Pondasi
1 Pekerjaan Pondasi Telapak
- Galian tanah 2-3 M m3
- Urugan tanah kembali + pemadatan m3
- Pasir urug bawah pondasi 10 cm m3
- Lantai kerja 5 cm m3
- Plastik Cor m2
- Beton m3
- Bekisting pasangan batako m2
- Besi pondasi tapak kg

2 Pekerjaan Pondasi Batu Kali


- Galian tanah m3
- Urugan tanah kembali + pemadatan m3
- Pasangan batu kali m3
- Pasir urug bawah pondasi 10 cm m3

3 Pekerjaan Tie Beam / Sloof


- Beton K225 m3
- Besi beton standard SNI termasuk besi angkur ke pondasi batu kali kg
- Bekisting plywood 9 mm m2
- Pasir urug bawah pondasi 10 cm m3
- Lantai kerja 5 cm m3

4 Buang tanah kelebihan eks galian --> keluar lokasi proyek m3

II.B Pekerjaan Struktur Lantai Dasar


1 Struktur Plat lantai bawah
- Pemadatan tanah m2
- Plastik cor m2
- Beton K225 Plat t = 8 cm m3
- Besi Wire Mesh M - 6 standard SNI ( 1 Lapis ) m2

2 Struktur Kolom
- Beton K225 m3
- Besi beton standard SNI kg
- Bekisting m2

3 Struktur Canopy (Plat & balok Overstek) as B/1-5,B/4-6,G/6-7,G-H/5,4/B-D


- Beton K225 m3
- Besi beton standard SNI kg
- Bekisting m2

4 Struktur Tangga ( termasuk balok bordes )


- Beton K225 m3
- Besi beton standard SNI kg
- Bekisting m2
- Galian m3
- Urug tanah kembali + pemadatan m3
- Buang sisa tanah m3

5 Waterproofing coating ex Sika Top


- Lantai toilet Lt. bawah + dinding toilet setinggi 20cm m2
- Dak dan canopy + dinding keliling setinggi 10cm m2

II.C Pekerjaan Struktur Lantai Atas


1 Struktur Kolom
- Beton K225 m3
- Besi beton standard SNI kg
- Bekisting m2

2 Struktur Balok + Janggutan


- Beton K225 m3
- Besi beton standard SNI kg
- Bekisting m2

3 Struktur Plat lantai


- Beton K225 m3
- Besi beton standard SNI kg
- Bekisting m2

4 Struktur Canopy (Plat & balok Overstek) as G/5-7,D/1-3,G-H/5


- Beton K225 m3
- Besi beton standard SNI kg
- Bekisting m2

5 Waterproofing coating ex Sika Top


- Lantai toilet Lt. Atas + dinding toilet setinggi 20cm m2
- Dak dan canopy + dinding keliling setinggi 10cm m2

6 Screeding + Kawat Ayam


- Dak dan canopy m2

II.D Pekerjaan Struktur Lantai Atap


1 Struktur Balok + Janggutan
- Beton K225 m3
- Besi beton standard SNI kg
- Bekisting m2
2 Struktur Plat lantai
- Beton K225 m3
- Besi beton standard SNI kg
- Bekisting m2

3 Waterproofing coating ex Sika Top


- Dak + dinding keliling setinggi 10cm m2

4 Screeding + Kawat Ayam


- Dak dan canopy m2

III PEKERJAAN DINDING + FINISHING


III.A Pekerjaan Dinding Lantai - 1
1 Pekerjaan pasangan dinding bata m2
2 Kolom praktis 11x11 cm m'
3 Balok latei keliling seluruh Kusen Pintu & jendela termasuk Finishing openingnya. m'
4 Pekerjaan plesteran dinding + bawah tangga m2
5 Pekerjaan acian dinding + bawah tangga dengan MU 250 m2
6 Pekerjaan plesteran + aci + tali air 2 cm pada dinding + cat weathercoat m2
7 Pekerjaan cat dinding dalam eks Mowilex tipe cendana m2
8 Pekerjaan cat dinding luar eks Mowilex tipe weathercoat m2
9 Pasangan dinding batu Paras Jogja m2

III.B Pekerjaan Dinding Lantai - 2


1 Pekerjaan pasangan dinding bata m2
2 Kolom praktis 11x11 cm m'
3 Balok latei keliling seluruh Kusen Pintu & jendela termasuk Finishing openingnya. m'
4 Pekerjaan plesteran dinding m2
5 Pekerjaan acian dinding dengan MU 250 m2
6 Pekerjaan plesteran + aci + tali air 2 cm pada dinding + cat weathercoat m2
7 Pekerjaan cat dinding dalam eks Mowilex tipe cendana m2
8 Pekerjaan cat dinding luar eks Mowilex tipe weathercoat m2
9 Plester + aci kasar + cat weathershield m2
10 Profilan bawah kusen jendela utama depan m'

III.C Pekerjaan Dinding Lantai - Atap Dak Beton Parapet


1 Pekerjaan pasangan dinding bata m2
2 Pekerjaan plesteran dinding m2
3 Pekerjaan acian dinding dengan MU 250 m2
4 Pekerjaan cat dinding luar eks Mowilex tipe weathercoat m2

IV. PEKERJAAN FINISHING LANTAI


IV.A Pekerjaan Finishing Lantai Dasar
1 Homogenous Tile Indogress uk. 80x80 cm type Grigio Travertino (K1)
- Living room, dining room, pantry,Guest bedroom m2

3 Homogenous Tile Niro Granite uk. 60x60 cm type Nordic Stone Brown/Black (K3) m2
- Teras Depan dan Teras Belakang
4 Koral sikat (K9)
- Selasar Depan m2

5 Homogenous Tile Niro Granite uk. 60x60 cm type Nordic Stone Brown/Black (K3)
- Selasar Depan m2

6 Keramik Roman uk. 30 x 30 cm ; tipe 337102 (K4)


- Service area m2

8 Finishing Anak Tangga Papan Jati t=3 cm & list t=2 cm


finish melamic open pour :
- Area Tangga Antrede (injakan) m2
- Area Tangga Optrede (trap) m2

9 Step nosing tangga


- Tangga utama m'
- Tangga service m'

10 Finishing Anak Tangga Service(K4)


- Area Tangga Antrede (injakan) m2
- Area Tangga Optrede (trap) m2

11 Keramik Toilet Powder Room


- Lantai granite Indo Gress uk. 40x40 cm ; tipe Zirconium Unpolished (K10) m2
- Lantai Granite Indo Gress uk. 60x60 cm ; tipe Aurora (K11) m2
- Dinding granite Indo Gress uk. 40x40 cm ; tipe Zirconium Polished (K12) m2
- Meja wastafel lebar 60 cm m'
- Finish meja ; granite Black Galaxi lebar 60 cm m'

12 Area Kitchen :
- Meja dapur lebar 80 cm m'
- Keramik meja dapur 20x20 cm tipe Lucido Bianco W. 20106 m2
- Keramik dinding dapur 20x20 cm tinggi 80 cm, tipe Lucido Bianco W. 20106 m2
- Keramik List dinding dapur 6 x 20 cm Tipe Listello Strawberry m'

13 Area Pantry : --->meja + wastafel by Other (Interior)

IV.B Pekerjaan Finishing Lantai Atas


1 Homogenous Tile Indogress uk. 80x80 cm type Grigio Travertino (K1)
- Master bedroom, kiddie room1&2,hall m2

3 Keramik Toilet Master Bathroom


- Lantai HT Indo Gress uk. 40x40 cm ; tipe Zirconium Unpolished (K10) m2
- Lantai HT Indo Gress uk. 60x60 cm ; tipe Aurora (K11) m2
- Koral terazo Ø 2-4 cm (K18) m2
- Dinding HT Indo Gress uk. 40x40 cm ; tipe Zirconium Polished (K12) m2
- Meja wastafel lebar 60 cm m'
- Finish meja ; granite Black Galaxi lebar 60 cm m'
- List granite Black Galaxi uk. 2x10 cm dipinggul m'
4 Keramik Toilet Kiddie room
- Lantai ex. Indo Gress uk. 40x40 cm ; tipe Zirconium Unpolished (K10) m2
- Lantai ex. Indo Gress uk. 60x60 cm ; tipe Aurora (K11) m2
- Dinding ex. Indo Gress uk. 40x40 cm ; tipe Zirconium Polished (K12) m2
- Meja wastafel lebar 60 cm m'
- Finish meja granite Black Galaxy lebar 60 cm (incl. pinggulan) m'

5 Homogenous Tile Niro Granite uk. 60x60 cm type Nordic Stone Brown/Black (K3)
- Balkon Depan dan belakang m2

6 Keramik Roman uk. 30 x 30 cm ; tipe 337102 (K4) m2


- Service area & maid room

8 Keramik Toilet Service


- Keramik lantai ex. Roman uk. 20x20 cm warna putih (K16) m2
- Keramik dinding ex. Roman uk. 20x20 cm warna putih (K17) m2

9 Keramik Tile Roman uk. 30x30 cm type 337409 (K8) m2


- Drying Area

VI. PEKERJAAN RAILLING & TANGGA SERVICE


1 Railing tangga utama rangka hollow 40x40 + 40x20 + 20x20 t=2mm, plat dudukan
handrail, plat t=3 mm finish Duco + handrail kamper oven dgn uk. Jadi 4x6 cm,
pingulan finish melamic open pour m'
2 Railing pas. Bata + plester + aci + cat Cendana ex. Mowilex
tinggi 900 mm
- Tangga service area m'
3 Tangga monyet untuk maintenance dak atap + watertorn pipa besi ∅ 2"+ ∅1"
tinggi 3,20 m lapis Zincromat Finish cat besi semi duco unit

VIII. PEKERJAAN ATAP


1 Rangka atap Baja Ringan zincalum m2
- Talang seng jurai rata BJLS 20 m'
2 Insulation seng rata BJLS 20 m2
3 Penutup atap genteng ex. Cisangkan
- Genteng badan m2
- Genteng nok termasuk karpusan + cat m'
- Genteng nok 3 arah bh
- Genteng nok ujung bh
4 Woodplank motif urat kayu m'
5 Glass block 20/20 bh

IX. PEKERJAAN SANITARY


IX.A Pekerjaan Sanitary Lantai - 1
1 Toilet Powder room
- Shower ex. Toto ; TX 488 S + TX 468 SES set
- Closet duduk ex. Toto ; type CW 421 J / SW 420 JP set
- Jet washer w/. Stop valve ex. Toto ; TX 403 SMCRB set
- Wastafel ex. Toto ; type LW 641 J W/F komplit + kran TX 119 LES set
- Floor drain ex. Toto ; TX 1 BN bh

2 Kitchen
- Kitchen sink stainlees steel ex. Lokal/cina+ Avoer unit
- Kran sink ex. Toto ; tipe TX 603 KM, flexible hose, stopvalve set

4 Carport, taman depan dan belakang


- Kran taman eks Toto ; tipe T 23 B13 V7NB bh

IX.B Pekerjaan Sanitary Lantai - 2


1 Master bathroom :
- Bathtube ex. Toto ; FB 1700 - 70 complete + 9005 unit
- Kran bath tub & shower set ex. Toto ; TX 445 SESM set
- Shower ex. Toto ; TX 488 S + TX 468 SES set
- Closet duduk ex. Toto ; type CW 823 J W/F-V2 set
- Jet washer w/. Stop valve ex. Toto ; TX 403 SMCRB set
- Wastafel ex. Toto ; type LW 548 W/F komplit + kran Toto TX 119 LES set
- Floor drain ex. Toto ; TX 1 BN bh

2 Kiddie bathroom :
- Shower ex. Toto ; TX 488 S + TX 468 SES set
- Closet duduk ex. Toto ; type CW 421 J / SW 420 JP set
- Jet washer w/. Stop valve ex. Toto ; TX 403 SMCRB set
- Wastafel ex. Toto ; type LW 641 J W/F komplit + kran TOTO TX 119 LES set
- Floor drain ex. Toto ; TX 1 BN bh

3 Toilet service
- Closet Jongkok CE6 set
- Kran tembok eks Toto ; tipe T 23 B13 V7NB bh
- Floor drain ex. Toto ; TX 1 BN bh

4 Washing Area
- Kran tembok eks Toto ; tipe T 23 B13 V7NB bh
- Floor drain ex. Toto ; TX 1 BN bh

X. PEKERJAAN PLUMBING
X.A. Pekerjaan Instalasi Air Bersih
1 Equipment
- Pantek sumur u/. Jet pump 30m+ pipa casing dia. 4" 28 m' + Pipa Suction Dia.
ttk
1.25" & Dia. 1"
- Pompa jetpump EX. Shimizu ; 250 w ; tangki putih utk daya suction 30m unit
- Pompa distribusi Shimizu 100 W (Lokal) + Valve unit
- Roof tank fiberglass ; kap. 1 m3 + WLC + pengkabelan + valve unit
- Bak kontrol pompa ; uk. 60x60x60 unit
2 Supply
- Dari sumur pantek ke pompa PVC AW dia. 1" m'
- Dari pompa ke Roof Tank ; PVC AW Ø 1" m'
- Dari PAM ke Roof tank ; PVC AW Ø1" (Dop dia 1") m'

3 Distribusi dari Roof tank ke Lantai Atas


- PVC AW dia. 1" m'
- PVC AW dia. 3/4" m'
- PVC AW dia. 1/2" m'

4 Distribusi dari Roof tank ke Lantai Dasar


- PVC AW dia. 1" m'
- PVC AW dia. 3/4" m'
- PVC AW dia. 1/2" m'

5 Fitting dan Assesoris (termasuk ball valve, dll) Ls

X.B. Pekerjaan Instalasi Air Panas Lt. Dasar & Lt. Atas
1 Pipa distribusi pipa HDPE
- dia. 1/2" m'

X.C. Pekerjaan Instalasi Air Hujan, Air Bekas & Air Kotor
1 Equipment
- Septictank Bio tank BK 08 STD Kap. tangki 2.25 m3 unit
- Biaya Pasang termasuk galian tanah, urugan kembali, pondasi septictank unit

2 Pekerjaan instalasi pipa lantai dasar :


- PVC AW - dia. 6" m'
- PVC AW - dia. 4" m'
- PVC AW - dia. 3" m'
- PVC AW - dia. 2" m'
- PVC AW - dia. 2" (pipa vent) m'

3 Pekerjaan instalasi pipa lantai atas :


- PVC AW - dia. 4" m'
- PVC AW - dia. 3" m'
- PVC AW - dia. 2" m'
- PVC AW - dia. 2" (pipa vent) m'

4 Pipa drain AC PVC AW dia. 1" m'

5 Perlengkapan lain
- Roof drain Antasan type tutup cambung dia. 3" bh
- Floor drain di drying area ex. Toto ; TX 1 BN bh
- Bak kontrol air hujan; uk. 40x40x40 unit
- Fitting & Assesoris Ls

6 Sumur Resapan Buis Beton precast Ø80 cm kedalaman 2 m' unit


X.D. Pekerjaan Sparing + Pancingan Instalasi SRTR, MATV
1 Sparing pipa PVC dia. 2" tipe - AW dibawah Drive Way searah saluran (2Jalur ) m'

XII. PEKERJAAN LUAR DAN HALAMAN


4 Struktur Carport & Path Way
- Lantai kerja t = 5 cm m3
- Beton K225 tebal 8 cm m3
- Besi beton standard SNI dia. 8 - 15 cm - 1 lapis / wire mesh M6 kg
- Paving block tipe Altstadt pola design 6 cm m2
(90% nat, 10% warna khusus)
6 Bak sampah pasangan bata finish plester aci cat Weathercoat dan unit
tutup dari plat besi
9 Pekerjaan Pagar Luar Depan dan belakang
Pekerjaan Pondasi Batu Kali
- Galian tanah m3
- Urugan tanah kembali + pemadatan m3
- Pasangan batu kali m3
- Pasir urug bawah pondasi 10 cm m3
Pekerjaan Tie Beam / Sloof, kolom praktis dan Ringbalk
- Beton K225 m3
- Besi beton standard SNI termasuk besi angkur ke pondasi batu kali kg
- Bekisting m2
10 Pekerjaan pasangan dinding bata top level + 0,60 m dari Peil lantai m2
11 Pekerjaan plesteran + aci + tali air 2 cm pada dinding + cat weathercoat m2
12 Finishing Facade Depan batu Paras Jogya 15/60 lapis Coating Ex. Mowilex m2
13 Finishing dinding Facade nat tali air 1,5 x 2 cm Finish Cat Ex. Mowilex Weathercoat m2
VOLUME HARGA SAT UPAH TOTAL

7,500.00 -

25,000.00 -
7,000.00 -
9,500.00 -
80,000.00 -
2,000.00 -
100,000.00 -
20,000.00 -
1,080.00 -

18,000.00 -
7,000.00 -
75,000.00 -
9,500.00 -

100,000.00 -
1,080.00 -
30,000.00 -
9,500.00 -
80,000.00 -

10,000.00 -

3,000.00 -
2,000.00 -
100,000.00 -
500.00 -

100,000.00 -
1,080.00 -
30,000.00 -
-
-
100,000.00 -
1,080.00 -
30,000.00 -
-
-
100,000.00 -
1,080.00 -
30,000.00 -
18,000.00 -
7,000.00 -
10,000.00 -
-
-
-
5,000.00 -
-
-
-
-
100,000.00 -
1,080.00 -
30,000.00 -
-
-
100,000.00 -
1,080.00 -
30,000.00 -
-
-
100,000.00 -
1,080.00 -
30,000.00 -
-
-
100,000.00 -
1,080.00 -
30,000.00 -
-
-
5,000.00 -
5,000.00 -
-
-
12,000.00 -
-
-
-
100,000.00 -
1,080.00 -
30,000.00 -
-
-
100,000.00 -
1,080.00 -
30,000.00 -
-
-
5,000.00 -
-
-
12,000.00 -
- -
-
-
17,500.00 -
7,500.00 -
9,000.00 -
15,000.00 -
5,000.00 -
24,000.00 -
-
-
35,000.00 -
-
-
-
21,000.00 -
9,000.00 -
12,500.00 -
19,500.00 -
6,500.00 -
26,000.00 -
-
-
24,000.00 -
8,000.00 -
-
-
-
25,000.00 -
23,000.00 -
7,500.00 -
-
-
-
-
-
30,000.00 -
-
30,000.00 -
-
-
-
18,000.00 -
-
-
30,000.00 -
-
-
30,000.00 -
-
-
-
-
-
-
-
6,000.00 -
6,000.00 -
-
-
30,000.00 -
30,000.00 -
-
-
30,000.00 -
30,000.00 -
39,000.00 -
-
15,000.00 -
-
-
-
30,000.00 -
39,000.00 -
6,000.00 -
-
-
-
-
-
-
30,000.00 -
-
-
30,000.00 -
30,000.00 -
-
39,000.00 -
-
15,000.00 -
15,000.00 -
-
-
30,000.00 -
30,000.00 -
39,000.00 -
-
15,000.00 -
-
-
-
-
30,000.00 -
-
-
-
30,000.00 -
39,000.00 -
-
30,000.00 -
-
- -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
22,000.00 -
20,000.00 -
-
15,000.00 -
22,000.00 -
8,000.00 -
8,000.00 -
8,000.00 -
25,000.00 -

-
20,000.00 -
150,000.00 -
10,000.00 -
105,000.00 -
5,000.00 -

15,000.00 -
5,000.00 -

5,000.00 -

190,000.00 -
20,000.00 -
20,000.00 -
150,000.00 -
10,000.00 -
105,000.00 -
5,000.00 -

20,000.00 -
150,000.00 -
10,000.00 -
105,000.00 -
5,000.00 -

160,000.00 -
5,000.00 -
5,000.00 -

5,000.00 -
5,000.00 -

- -
- -
- -
100,000.00 -
3,825.00 -
3,825.00 -
3,825.00 -

3,800.00 -
3,800.00 -
3,800.00 -

3,800.00 -
3,800.00 -
3,800.00 -
-

7,000.00 -

-
185,000.00 -

10,000.00 -
10,000.00 -
10,000.00 -
6,000.00 -
6,000.00 -
-
-
10,000.00 -
10,000.00 -
6,000.00 -
6,000.00 -
-
3,800.00 -
-
-
5,000.00 -
5,000.00 -
70,000.00 -
125,000.00 -

-
6,000.00 -

80,000.00 -
100,000.00 -
1,080.00 -
30,000.00 -

175,000.00 -

18,000.00 -
7,000.00 -
75,000.00 -
9,500.00 -
-
100,000.00 -
1,080.00 -
30,000.00 -
17,500.00 -
24,000.00 -
20,000.00 -
25,000.00 -
-