REKAPITULASI TOTAL
A. PEKERJAAN PERSIAPAN
B. PEMBANGUNAN
1 PEMBORAN SUMUR EKSPLORASI
1.1 PENGADAAN BAHAN MATERIAL
1.2 PEKERJAAN PEMBORAN SUMUR
1.3 PEKERJAAN UJI PEMOMPAAN
1.4 PEKERJAAN UJI KUALITAS AIR
C. PEKERJAAN FINISHING
TOTAL
P. P. N. 10%
TOTAL
DIBULATKAN
Terbilang : Seratus enam puluh lima juta sembilan ratus lima puluh ribu rupiah
Kupang, 12 Juni
Dibuat Konsultan Pe
PT. INDOTEC TIGA
RIDWAN MUHAM
Team Leade
NEERING ESTIMATE
KAPITULASI TOTAL
TOTAL HARGA
(Rp.)
10,772,000.00
21,238,351.47
101,374,803.60
15,580,840.00
1,501,500.00
400,000.00
150,867,495.07
15,086,749.51
165,954,244.58
165,950,000.00
RIDWAN MUHAMAD, ST
Team Leader
DAFTAR KUANTITAS DAN HARGA
PEKERJAAN : PERENCANAAN PENGEBORAN SUMUR BOR EXPLORASI `
LOKASI : DESA WAEMANGURA, DUSUN KAMBUROTO, KAMPUNG WEEKANESA BONDO KECAMATAN W
BARAT KABUPATEN SUMBA BARAT DAYA
SATUAN KERJA : DINAS ENERGI DAN SUMBER DAYA MINERAL PROVINSI NTT
TAHUN ANGGARAN : 2017
Jumlah Harga
(Rp.)
6,072,000.00
400,000.00
800,000.00
500,000.00
1,500,000.00
300,000.00
1,200,000.00
10,772,000.00
9,581,880.00
2,960,000.00
2,400,000.00
120,000.00
450,000.00
2,400,000.00
40,000.00
600,000.00
454,121.47
350,000.00
1,582,350.00
300,000.00
21,238,351.47
1,154,685.00
124,284.00
37,334,815.00
2,508,000.00
11,825,000.00
5,000,680.00
16,144,777.00
2,500,340.00
14,837,869.20
4,324,302.40
1,610,400.00
500,068.00
Jumlah Harga
(Rp.)
3,509,583.00
101,374,803.60
Jumlah Harga
(Rp.)
1,416,440.00
12,747,960.00
1,416,440.00
15,580,840.00
1,501,500.00
1,501,500.00
139,695,495.07
400,000.00
400,000.00
REKAPITULASI
ANALISA HARGA PEKERJAAN
SATUAN KERJA : DINAS ENERGI DAN SUMBER DAYA MINERAL PROVINSI NTT
TAHUN ANGGARAN : 2017
Jumlah
No Jenis Pekerjaan (Rp.)
A. PEKERJAAN PERSIAPAN
1 Mobilisasi dan Demobilisasi 3,036,000.00
B. PEMBANGUNAN
1 Pengisian Mortar (Grouting) dan Pondasi (Concrete Slab) (m) 908,242.94
2 Pemasangan 1 m' pipa PVC Ø 6" 176,641.30
3 Pemasangan 1 m' pipa saringan (screen pipa)PVC Ø 6" 270,268.90
4 Pemasangan 1 m' pipa GIV Ø 1/2" 50,136.90
5 Sampling 1 sampel analisa kualitas air 1,501,500.00
6 Pemboran Pada Segala Formasi 384,895.00
7 Pekerjaan Pemasangan dan Pencabutan Pipa 124,284.00
8 Pekerjaan Pencucian Sumur ( Air Compressor ) 500,068.00
9 Pekerjaan Pemompaan Uji 177,055.00
10 Pekerjaan Pencucian Sumur ( Water Jetting ) 349,162.00
ANALISA HARGA SATUAN PEKERJAAN KONSTRUKSI
B. Jumlah A 2,760,000.00
C. Overhead + Profit (Contoh 15%) 10% B 276,000.00
D. Harga Satuan Pekerjaan (m) (B+C) 3,036,000.00
1 Drilling Ring
Merk / Type
HP : 40 Pk
Isi Pelumas Mesin : 12 Ltr
Isi Pelumas Transmisi : 10 Ltr
Isi Pelumas Hydrolick : 120 Ltr
Isi Pelumas Gear Box : 4 Ltr
2 MUD PUMP
Merk / Type
HP : 40 Pk
Isi Pelumas Mesin : 12 Ltr
3 Air Compressor
Merk / Type
HP : 120 Pk
Isi Pelumas Mesin : 30 Ltr
Isi Pelumas Compressor : 12 Ltr
4 Truck
Merk / Type
HP : 90 Pk
Isi Pelumas Mesin : 12 Ltr
Pelumas Gardan : 4 Ltr
Isi Pelumas Transmisi : 10 Ltr
V. Filter Gravel
33,120.00
6,000.00
1,000.00
6,000.00
875.00
200.00
47,195.00
6,000.00
875.00
6,875.00
99,360.00
15,000.00
30,000.00
144,360.00
74,520.00
30,000.00
400.00
1,000.00
875.00
106,795.00
37,260.00
6,000.00
875.00
44,135.00
62,500.00
50,000.00
50,000.00
50,000.00
136,000.00
40,000.00
388,500.00
48,562.50
80,000.00
100,000.00
136,000.00
316,000.00
39,500.00
279,924.11
124,284.00
303,071.56
107,306.44
141,075.67
349,905.14
34,990.51
384,895.65
384,895.00
139,962.06
13,996.21
153,958.26
153,958.00
151,310.33
15,131.03
166,441.36
166,441.00
317,420.25
31,742.03
349,162.28
349,162.00
454,607.33
45,460.73
500,068.07
500,068.00
160,959.67
16,095.97
177,055.63
177,055.00
80,000.00
136,000.00
150,000.00
366,000.00
36,600.00
402,600.00
402,600.00
2,400.00
20,400.00
22,800.00
2,280.00
25,080.00
25,080.00
VI. BIAYA PENYUSUTAN
1
1 Mesin bor Rp. 135,000,000 Rp.
8 x 30 x 12 x 6 Tahun
1
2 Mud Pump Rp. 123,000,000 Rp.
8 x 30 x 12 x 6 Tahun
1
3 Truck Rp. 120,000,000 Rp.
8 x 30 x 12 x 6 Tahun
1
4 Generator/Genset Rp. 95,000,000 Rp.
8 x 30 x 12 x 6 Tahun
1
5 Mata bor segala ukuran Rp. 35,000,000 Rp.
8 x 30 x 12 x 6 Tahun
1
6 Logging Rp. 75,000,000 Rp.
8 x 30 x 12 x 6 Tahun
1
7 Compressor Rp. 80,000,000 Rp.
8 x 30 x 12 x 6 Tahun
7,812.50
7,118.06
6,944.44
5,497.69
2,025.46
4,340.28
4,629.63
ANALISA HARGA SATUAN PEKERJAAN ALAT
Tabel - 1
Pekerjaan Pemboran pada segala Formasi
I. BIAYA LANGSUNG
1 Biaya Pemilikan
- Penyusutan 7,812.50 7,118.06 6,944.44
2 Biaya Operasi
- Operasi peralatan 47,195.00 6,875.00 106,795.00
- Upah operator 48,562.50
3 Biaya Pemeliharaan
Tabel - 2
Pekerjaan Pemasangan dan Pencabutan Pipa
I. BIAYA LANGSUNG
1 Biaya Pemilikan
- Penyusutan 7,812.50
2 Biaya Operasi
- Operasi peralatan 47,195.00
- Upah operator 48,562.50
3 Biaya Pemeliharaan
Jumlah 124,284.00 - - - -
Tabel - 3
Pekerjaan Pencucian Sumur ( Air Compressor )
I. BIAYA LANGSUNG
1 Biaya Pemilikan
- Penyusutan 7,812.50 4,629.63
2 Biaya Operasi
- Operasi peralatan 47,195.00 144,360.00
- Upah operator 48,562.50
3 Biaya Pemeliharaan
Tabel - 4
Pekerjaan Pemompaan Uji
I. BIAYA LANGSUNG
1 Biaya Pemilikan
- Penyusutan
2 Biaya Operasi
- Operasi peralatan
- Upah operator 39,500.00
3 Biaya Pemeliharaan
Jumlah - - - - 47,400.00
Tabel - 5
Pekerjaan Pencucian Sumur ( Water Jetting )
I. BIAYA LANGSUNG
1 Biaya Pemilikan
- Penyusutan 7,812.50 7,118.06
2 Biaya Operasi
- Operasi peralatan 47,195.00 6,875.00
- Upah operator 48,562.50
3 Biaya Pemeliharaan
1,967.59 23,842.59
160,865.00
48,562.50
393.52 46,654.02
- 2,361.11 279,924.11
7,812.50
47,195.00
48,562.50
20,714.00
- - 124,284.00
Biaya Tiap Jam
Generator Ket.
Mata Bor
Pompa
12,442.13
191,555.00
48,562.50
50,511.93
- - 303,071.56
5,787.04 5,787.04
44,135.00 44,135.00
39,500.00
9,984.41 17,884.41
59,906.44 - 107,306.44
Biaya Tiap Jam
Generator Ket.
Mata Bor
Pompa
14,930.56
54,070.00
48,562.50
23,512.61
- - 141,075.67
HARGA SATUAN BAHAN, UPAH DAN SEWA PERALATAN
SATUAN KERJA : DINAS ENERGI DAN SUMBER DAYA MINERAL PROVINSI NTT
TAHUN ANGGARAN : 2017
HARGA SATUAN
NO. URAIAN (Rp.)
1. U P A H : 1,500,000
1 Pekerja 68,000.00
2 Mandor 85,000.00
3 Tukang Batu, Tukang Pipa 80,000.00
4 Kepala Tukang Batu 85,000.00
5 Tukang Besi 80,000.00
6 Kepala Tukang Besi 85,000.00
7 Tukang Kayu 80,000.00
8 Kepala Tukang Kayu 85,000.00
9 Tukang Cat 80,000.00
10 Kepala Tukang Cat 85,000.00
11 Tukang Listrik 85,000.00
12 Operator 80,000.00
13 Driver 80,000.00
14 Geologist/Hidrogeologist 500,000.00
15 Asisten Geologist 400,000.00
16 Teknisi/Laborat 200,000.00
17 Driller 125,000.00
18 Asisten Driller 100,000.00
19 Walder 100,000.00
20 Tenaga kerja lokal 68,000.00
21 Mekanik 100,000.00
22 Tool Pusher 68,000.00
23 Helper / Pembantu 68,000.00
24 Watchman 75,000.00
2. B A H A N :
1 Air 12.00
2 Air kerja 10,000.00
3 Alat Gali 35,000.00
4 Amplas 5,000.00
5 Analisa Kualitas Air 2,500,000.00
6 Balok 5/10 cm 3,750,000.00
7 Balok 6/12 cm 3,750,000.00
8 Balok 8/12 cm 3,750,000.00
9 Balok kayu kelas I 10,000,000.00
10 Balok kayu kelas II 3,100,000.00
11 Balok kayu kelas III 1,950,000.00
HARGA SATUAN
NO. URAIAN (Rp.)
12 Balok landasan jak 116,750.00
13 Bata Merah 1,750.00
14 Batako 2,500.00
HARGA SATUAN
NO. URAIAN (Rp.)
15 Batu Rooster/Batu Angin 10,000.00
16 Batu Bata/ Batu Merah 5 x 11 x 22 cm 1,100.00
17 Batu karang 125,000.00
18 Bensin 7,300.00
19 Bentonite 6,000.00
20 Besi Beton 12,000.00
21 Besi Siku 30.30.3 12,900.00
22 Besi Siku 50.50.5 32,000.00
23 Besi Srip 30/3 7,700.00
24 Besi Strip 12,000.00
25 Cat Besi 56,500.00
26 Cat Kayu 56,500.00
27 Cat Tembok 20,000.00
28 Cat Zinkchromate 30,000.00
29 Cat/Waterproof 75,000.00
30 Dolken kayu , φ (8–10) cm, panjang 4 m 5,500.00
31 Dop dia. 2" 10,100.00
32 Double nepel Dia.0,5" 3,100.00
33 Double nepel Dia.0,75" 3,600.00
34 Double nepel Dia.1" 5,100.00
35 Double nepel Dia.1,5" 8,100.00
36 Double nepel Dia.2" 10,100.00
37 Elbow dia. 1" 10,100.00
38 Elbow dia. 1,5" 20,100.00
39 Elbow dia. 2" 32,600.00
40 Embul dos 5,000.00
41 Engsel 45,000.00
42 Gravel Pack / sudah diayak 150,000.00
43 Gravel Patok yang sudah diayak 216,750.00
44 Grease 35,000.00
45 Grendel 35,000.00
46 Isolasi Kabel 15,000.00
47 Isolasi Pipa 2,000.00
48 Jendela nako 75,000.00
49 Kabel Power Pompa 3 x 6 NYYHY 62,250.00
50 Kabel WLC 3 x 2,5 NYM 16,200.00
51 Kaca nako 45,000.00
52 Katrol 50,500.00
53 Kawat Ikat 21,000.00
54 Kawat Las 10,100.00
55 Kayu Bulat Dolken 5,500.00
56 Kerikil/Batu Pecah 2/3 285,000.00
57 Kerikil/Batu Pecah 3/5 300,000.00
58 Klem pipa 37,700.00
59 Knee dia. 1" 5,100.00
60 Knee dia. 1,5" 9,500.00
61 Knee dia. 3" 42,600.00
62 Kran dia. 0,5" 45,000.00
HARGA SATUAN
NO. URAIAN (Rp.)
63 Kran dia. 0,75" 18,600.00
64 Kunci tanam 150,000.00
65 Lem PVC 60,000.00
66 Meni Besi 30,500.00
67 MeniKayu 30,500.00
HARGA SATUAN
NO. URAIAN (Rp.)
68 Minyak Bagesting 32,500.00
69 Mur,Baut,Beugel U 20,000.00
70 Murbaut dia 10mm 15,000.00
71 Murbaut dia 16mm 7,600.00
72 Murbaut dia 19mm 10,800.00
73 Over socket Ø 6" ke Ø 8" 135,000.00
74 Pagar BRC 650,000.00
75 Paku < 5 cm 18,500.00
76 Paku > 5cm 18,500.00
77 Paku Sekrup 15,000.00
78 Paku Seng 22,000.00
79 Panel Pompa Lengkap Dengan Support 7,600,000.00
80 Papan 2x10x4 m' 3,750,000.00
81 Papan 2x10x4 m' 3,750,000.00
82 Papan 2x10x4 m' 3,750,000.00
83 Papan 2x4x4 m' 3,750,000.00
84 Papan 2x7x4 m' 3,750,000.00
85 Papan 2x8x4 m' 3,750,000.00
86 Papan 3x10x4 m' 3,750,000.00
87 Papan 3x16x4 m' 3,750,000.00
88 Papan 3x18x4 m' 3,750,000.00
89 Papan 3x20x4 m' 3,750,000.00
90 Pasir Pasang, Beton 250,000.00
91 Pelumas Gardan 50,000.00
92 Pelumas Gear Box 50,000.00
93 Pelumas Hydraulick 50,000.00
94 Pelumas Mesin 50,000.00
95 Pelumas Transmisi 50,000.00
96 Pengadaan dan Pemasangan Genset dan Altenator 21,000,000.00
97 Pengadaan dan Pemasangan Patok Sumur 156,750.00
98 Pengadaan Pipa black steel dia. 6" 276,500.00
99 Pengadaan Pompa submersible type H = 116 m Q = 1,5 ltr/dtk, 1 phase 26,400,000.00
100 Pengadaan wellscreen LC dia. 6" 566,750.00
101 Pengelasan 7,500.00
102 Pengadaan dan Pemasangan Tutup Sumur bak dari plat besi 350,000.00
103 Pengadaan dan Pemasangan Bottom Plug 300,000.00
104 Pengadaan dan Pemasangan Centralizer 6" 300,000.00
105 Pintu (plat eser) pelindung Panel pompa 350,000.00
106 Pipa Gip dia. 1" 1.1 48,400.00
107 Pipa Gip dia. 1,25" 64,614.00
108 Pipa Gip dia. 1,5" 74,294.00
109 Pipa Gip dia. 2" 101,367.75
110 Pipa Gip dia. 2,5" 129,147.33
111 Pipa Gip dia. 3" 151,735.83
112 Pipa Gip dia. 3,5" 166,909.42
113 Pipa Gip dia. 4" 219,679.17
114 Pipa Gip dia. 6" 352,027.50
115 Pipa Gip dia. 8" 559,372.92
HARGA SATUAN
NO. URAIAN (Rp.)
116 Pipa Gip dia. 3/4" 29,030.83
117 Pipa Gip dia.1/2" 22,605.00
118 Pipa kabel 10,000.00
HARGA SATUAN
NO. URAIAN (Rp.)
119 Pipa PVC Ø. 1/2" 8,250.00
120 Pipa PVC Ø 3/4" 7,562.50
121 Pipa PVC Ø 6" 114,070.00
122 Pipa PVC Ø 8" 175,000.00
123 Pipa saringan (screen pipa) Gip dia. 6" 174,229.00
124 Pipa Saringan (screen pipa) PVC Ø 6" 185,000.00
125 Pipa Saringan (screen pipa) PVC Ø 8" 207,900.00
126 Plamir Tembok 10,000.00
127 Plat Baja tebal 1,2mm 277,000.00
128 Plat Eser 245,000.00
129 Pliposphat 20,000.00
130 Profil Tank 5000ltr (merk penguin) 12,000,000.00
131 PTEE Pipa Theadsolven 7,100.00
132 Reduser dia. 2"- 3" 32,600.00
133 Reduser dia. 2"-1,5" 12,600.00
134 Saklar Engkel Broco 14,000.00
135 Saringan klep Ø 3 " (75 mm) 105,000.00
136 Seal Tape 2,000.00
137 Semen PC @ 40 KG 60,000.00
138 Seng Gelombang 0,30mm 65,000.00
139 Seng licin 0,4 x 1m 15,000.00
140 Sirtu Gunung 150,000.00
141 Sirtu Kali 170,000.00
142 Socket dia. 1" 20,000.00
143 Socket dia. 2" 30,000.00
144 Socket dia. 2,5" 35,000.00
145 Socket dia. 3" 45,000.00
146 Socket dia. 3,5" 60,000.00
147 Socket dia. 4" 70,000.00
148 Socket dia. 6" 95,000.00
149 Socket dia. 8" 115,000.00
150 Solar 6,900.00
151 Stop kontak Broco 15,000.00
152 Stop kran dia. 0,5" 55,000.00
153 Stop kran dia. 1" 75,000.00
154 Stop kran dia. 2" 295,600.00
155 Stop kran dia. 1,5" 140,100.00
156 Stop kran dia. 3" 585,100.00
157 Tanah urug 75,000.00
158 Tangga naik 500,000.00
159 Tee dia. 2" 20,100.00
160 Tee dia. 1,5" 15,100.00
161 Teralis Besi 480,800.00
162 Tripleks 3 mm 59,000.00
163 Tripleks 9 mm 115,000.00
164 Usuk 2/3 cm 3,750,000.00
165 Usuk 3/5 cm 3,750,000.00
166 Usuk 5/7cm 3,750,000.00
HARGA SATUAN
NO. URAIAN (Rp.)
167 Water Mur dia. 0,75" 10,600.00
168 Water Mur dia. 1" 12,600.00
169 Water Mur dia. 1,5" 25,100.00
170 Water Mur dia. 2" 34,600.00
HARGA SATUAN
NO. URAIAN (Rp.)
3. A L A T :
No. Nama Alat Thn Pbtn Kapasitas
Drilling rig / Mesin Bor 2000 124,284.00
1 82 HP/150 Meter
Hidrolik Spindel
2 Mud Pump 2000 Piston 600 HP Lpm 16,791.67
3 Air Compressor 2000 100 HP 178,787.56
4 Truk Cargo 2000 3 Ton 136,487.33
5 Water Pump 2000 40Lt/mit 59,906.44
6 Generator Set 2000 18 KVA, 380 Volt 250,000.00
7 Mesin Las 2000 Mesinas 125,000.00
8 - Alat Bantu 10,000.00
9 - Alat Pemadam 25,000.00
10 Beton Mikxer 150,000.00
11 Resistivity Meter 2,000,000.00
BAHAN, UPAH DAN SEWA PERALATAN
SATUAN
oh
oh
oh
oh
oh
oh
oh
oh
oh
oh
oh
oh
oh
oh
oh
oh
oh
oh
oh
oh
oh
oh
oh
oh
Ltr
m3
set
Lbr
ls
m3
m3
m3
m3
m3
m3
SATUAN
btg
bh
bh
SATUAN
bh
bh
m3
ltr
kg
kg
m
m
m
kg
kg
kg
kg
kg
kg
btg
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
m3
m3
kg
bh
rol
bh
bh
m
m
bh
bh
kg
lsn
btg
m3
m3
bh
bh
bh
bh
bh
SATUAN
bh
bh
bh
kg
kg
SATUAN
ltr
kg
bh
bh
bh
bh
m2
kg
kg
dos
kg
unit
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
ltr
ltr
ltr
ltr
ltr
unit
bh
m
bh
m
ttk
ls
bh
bh
ls
m
m
m
m
m
m
m
m
m
m
SATUAN
m
m
btg
SATUAN
m
m
m
m
m
m
m
kg
lbr
lbr
bh
bh
bh
bh
bh
bh
bh
bh
zak
lbr
m
m3
m3
bh
bh
bh
bh
bh
bh
bh
bh
ltr
bh
bh
bh
bh
bh
bh
m3
Ls
bh
bh
m2
lbr
lbr
m3
m3
m3
SATUAN
bh
bh
bh
bh
SATUAN
jam
jam
jam
jam
jam
hari
hari
jam
jam
hari
hari