RENCANA PEMBIAYAAN RPLP TAHU

KELURAHAN PURANGI, KEC. SENDANA

No Sektor/Program Rincian Kegiatan Lokasi Volume Satuan

(1) (2) (3) (4) (5) (6)


A PENATAAN LINGKUNGAN PERMUKIMAN
1 Penataan Bantaran Sungai 1 Normalisasi RT.02/RW.05-RT.02/RW.06 545 Meter
2 Talud RT.02/RW.05-RT.02/RW.06 1090 Meter
3 Jalan Setapak RT.02/RW.05-RT.02/RW.06 545 Meter
4 Jembatan RT.02/RW.05-RT.02/RW.06 3 Unit
5 Penghijauan Sempadan Sungai RT.02/RW.05-RT.02/RW.06 117 Pohon
6 Papan Informasi & Aturan Bersama RT.02/RW.05-RT.02/RW.06 4 Unit
7 Pengecatan Talud RT.02/RW.05-RT.02/RW.06 1090 Meter
8 Pagar Pengaman Sungai RT.02/RW.05-RT.02/RW.06 545 Meter

2 Ruang Terbuka Hijau 1 Taman Bermain RT.02/RW.05 1 Unit


2 Taman Bermain dan Lap. Bulutangkis RT.02/RW.06 1 Unit
3 Taman Bermain RT.01/RW.06 1 Unit

4 Taman Lingkar Kaw. Sentra Pertanian Terpadu RT.02/RW.05 2 Unit

5 Taman Lingkar (Kolam Sumur Tua) RT.01/RW.06 1 Unit

3 Fasilitas Umum 1 PAUD + Taman Bermain RT.02/RW.06 1 Unit


2 Posyandu RT.02/RW.06 1 Unit
3 Rehab Posyandu RT.02/RW.05 1 Unit

4 Jalan dan Jembatan 1 Jalan Setapak Samping Sungai(J1) RT.01/RW.06 250 Meter
2 Pembentukan Badan Jalan (J2) + PlatDekker RT.01/RW.06-RT.01/RW.05 400 Meter
3 Jalan Setapak (J3) RT.01/RW.05 90 Meter
4 Jalan Setapak (J4) RT.01/RW.05 180 Meter
5 Jalan Setapak Samping Sungai (J5) RT.01/RW.06 130 Meter
6 Jalan Setapak (J6) RT.01/RW.06 85 Meter
7 Jalan Setapak (J7) RT.01/RW.06 195 Meter
8 Pembentukan Badan Jalan (J8) RT.01/RW.06 485 Meter

9 Pembentukan Badan Jalan Samping Sungai (J9) RT.02/RW.06 330 Meter

10 Pembentukan Badan Jalan (J10) RT.02/RW.06 152 Meter

11 Jalan Setapak (J11) RT.02/RW.06 60 Meter


12 Pembentukan Badan Jalan (J12) RT.02/RW.05 110 Meter

13 Pengembangan Jalan Kaw. Sentra Pertanian RT.02/RW.05 440 Meter


Terpadu (J13)
14 Jalan Setapak (J14) RT.02/RW.05 155 Meter
15 Jalan Setapak Samping Sungai (J15) RT.02/RW.06 635 Meter
16 Pengaspalan Jalan (J16) RT.02/RW.06 1578 Meter
17 Jalan Setapak (J17) RT.02/RW.06 37 Meter
18 Jembatan Batas Purangi Sendana 1 Unit
19 Plat Dekker RT02/RW.06 1 Unit

5 Hunian 1 Rehab Rumah Semua RT 34 Unit


2 Pagar Seragam Semua RT 123 Unit
6 Penataan Pedestrian 1 Pengecatan Drainase Jl. Opu Tohalide 998 Meter
2 Trotoar Jl. Opu Tohalide 454 Meter
3 Penghijauan Sempadan Jalan Jl. Opu Tohalide 100 Pohon
4 Halte Jl. Opu Tohalide 2 Unit
5 Rambu Jalan Jl. Opu Tohalide 4 Unit
6 Marka Jalan Jl. Opu Tohalide 454 Meter
7 Papan Informasi & Aturan Bersama Jl. Opu Tohalide 2 Unit
8 Pot Bunga Jl. Opu Tohalide 50 unit
9 Tugu Penanda Kawasan Prioritas Jl. Opu Tohalide 2 Unit

7 Penerangan Kawasan 1 Lampu Jalan Utama Jl. Opu Tohalide 8 Unit


2 Lampu Jalan Lingkungan Semua RT 19 Unit
3 Penerangan Jalan Bantaran Sungai RT.02/RW.05-RT.02/RW.06 27 Unit
4 Lampu Pekarangan Semua RT 123 Unit

SUB TOTAL A
B PENYEHATAN LINGKUNGAN PERMUKIMAN
1 Pengelolahan Sampah 1 Bank Sampah RT.02/RW.06 1 Unit
2 Tempat Sampah Rumah Tangga Semua RT 121 Unit
3 Bak Sampah Komunal Semua RT 4 Unit
4 Bor Biopori Semua RT 16 Unit
5 Motor Sampah Semua RT 1 Unit

2 SPAL 1 Perpipaan SPAL Semua RT 69 Paket


2 Bak Penyaring Semua RT 123 Unit
3 Bidang Peresapan (Sumur Resapan) Semua RT 15 Unit

3 Pembangunan Drainase 1 Saluran Drainase (d1) RT.01/RW.06 290 Meter


2 Saluran Drainase (d2) RT.01/RW.06 430 Meter
3 Saluran Drainase (d3) RT.01/RW.06 200 Meter
4 Saluran Drainase (d4) RT.02/RW.06 327 Meter
5 Saluran Drainase (d5) RT.01/RW.06-RT.01/RW.05 426 Meter
6 Saluran Drainase (d6) RT.01/RW.05 185 Meter
7 Saluran Drainase (d7) RT.01/RW.05 101 Meter

8 Pembangunan dan Rehab Saluran Drainase (d8) RT.02/RW.06-RT.02/RW.05 154 Meter

9 Saluran Drainase (d9) RT.02/RW.05 160 Meter


10 Saluran Drainase (d10) RT.02/RW.05 51 Meter

11 Saluran Drainase Kaw. Sentra Pertanian Terpadu RT.02/RW.05 299 Meter


(d11)

12 Saluran Drainase (d12) RT.02/RW.05 162 Meter


13 Saluran Drainase (d13) RT.02/RW.05 82 Meter
14 Saluran Drainase (d14) RT.02/RW.05 1116 Meter
15 Saluran Drainase (d15) RT.02/RW.05-RT.02/RW.06 1205 Meter
16 Riol (r1) RT.01/RW.06 92 Meter
17 Riol (r2) RT.01/RW.06 68 Meter
18 Riol (r3) RT.02/RW.06 135 Meter
19 Riol (r4) RT.02/RW.06 153 Meter
20 Riol (r5) RT.01/RW.05 157 Meter

4 Jamban 1 Jamban Keluarga Semua RT 12 Unit


2 Rehab MCK Umum RT.02/RW.06 1 Unit
3 MCK Umum RT.01/RW.06 1 Unit

SUB TOTAL B
C PENGEMBANGAN AIR MINUM
1 Sarana Air Minum 1 Hidran Umum Semua RT 5 Unit
2 Wadah Penyaring Semua RT 108 Unit
3 Sambungan PDAM Semua RT 108 Rumah

SUB TOTAL C
D PENANGULANGAN BENCANA
1 Longsor Batas Kelurahan 1 Talud+Bronjong Batas Purangi Sendana 500 Meter
2 Normalisasi Sungai Batas Purangi Sendana 250 Meter
3 Reling Pengaman Batas Purangi Sendana 100 Meter

2 Longsor Sungai Salangka 1 Talud RT.02/RW.06 1270 Meter

3 Sosialisasi dan Bantuan 1 Penyuluhan dan Sosialisasi Bencana Semua RT 1 Paket


2 Media Sosialisasi Bencana Semua RT 1 Paket
3 Pegadaan Bibit Hutan Semua RT 1 Paket

SUB TOTAL D
E PENGEMBANGAN SOSIAL
1 Pendidikan Formal 1 Program Paket B Semua RT 1 Paket
2 Program Paket C Semua RT 1 Paket

2 Pendidikan Nonformal 1 Pelatihan Menjahit Semua RT 3 Kelompok


2 Bantuan Mesin Jahit Semua RT 3 Kelompok
3 Pelatihan Meubel Semua RT 1 Kelompok

3 Kesehatan 1 Penyuluhan Kesehatan Lingkungan Semua RT 1 Paket

2 Penyuluhan KB, Kesehatan ibu hamil dan balita. Semua RT 1 Paket

4 Kelembagaan 1 Peningkatan Kapasitas Kelembagaan Kawasan 1 Paket


SUB TOTAL E
F PENGEMBANGAN EKONOMI
1 Ekonomi Kawasan 1 Modal Usaha Pengembangan Pertanian Semua RT 3 Kelompok

2 Ekonomi Rumah Tangga 1 Pelatihan Pembuatan Makanan Ringan Semua RT 1 Paket


2 Modal Usaha Rumah Tangga Semua RT 4 Kelompok

SUB TOTAL F
G PENGEMBANGAN PERTANIAN
1 Kebun Percontohan 1 Balai Tani RT.02/RW.05 1 Unit
2 Pemagaran RT.02/RW.05 120 Meter
3 Green House (Rumah Benih) RT.02/RW.05 2 Unit
4 Rumah Kompos RT.02/RW.05 1 Unit
5 Budidaya Jamur Tiram RT.02/RW.05 1 Unit
6 Sarana Air Bersih RT.02/RW.05 1 Unit

2 Bantuan Pertanian 1 Pemanfaatan Lahan Pekarangan Semua RT 121 Paket


2 Pengadaan Bibit Pertanian Semua RT 1 Paket
3 Pupuk Semua RT 1 Paket
4 Traktor Kebun RT.02/RW.05 2 Unit
5 Alat Pertanian Semua RT 1 Paket
6 Media Pembibitan Jamur RT.02/RW.05 1 Unit
7 Embung RT.02/RW.05 1 Unit

3 Pendidikan Pertanian 1 Penyuluhan Pertanian Semua RT 1 Paket

2 Semua RT 1 Paket
Pelatihan Pembuatan Pupuk dan Obat Hama

SUB TOTAL G
JUMLAH TOTAL
MBIAYAAN RPLP TAHUN 2017 - 2021
PURANGI, KEC. SENDANA, KOTA PALOPO

Rencana Sumber Pembiayaan


Rencana Pembiayaan Tahun
BLM PLPBK APBN APBD Swasta CSR Masyarakat
(7) (8) (9) (10) (11) (13) (14) (15)

40,950,000 2015 40,950,000


580,000,000 2015 450,000,000 130,000,000
60,000,000 2015 60,000,000
25,000,000 2015 25,000,000
5,850,000 2016 5,000,000 850,000
8,000,000 2015 4,000,000 4,000,000
21,800,000 2016 10,000,000 10,000,000 1,800,000
285,000,000 2017 185,000,000 100,000,000

30,000,000 2017 30,000,000


35,000,000 2015 35,000,000
30,000,000 2018 30,000,000

60,000,000 2017 30,000,000 30,000,000

30,000,000 2018 30,000,000

40,000,000 2016 40,000,000


25,000,000 2019 25,000,000
10,000,000 2015 10,000,000

25,000,000 2019 25,000,000


40,000,000 2015 25,000,000 15,000,000
9,000,000 2018 9,000,000
18,000,000 2018 18,000,000
13,000,000 2018 13,000,000
8,500,000 2016 8,500,000
19,500,000 2016 19,500,000
32,000,000 2016 32,000,000

21,780,000 2016
21,780,000

15,200,000 2015 15,200,000

6,000,000 2015 6,000,000


7,260,000 2015 7,260,000

57,640,000 2017 57,640,000

15,500,000 2017 15,500,000


63,500,000 2020 33,500,000 30,000,000
2,367,000,000 2020 1,500,000,000 867,000,000
5,000,000 2015 5,000,000
300,000,000 2020 300,000,000
5,000,000 2015 5,000,000

340,000,000 2016 290,000,000 50,000,000


123,000,000 2017 50,000,000 50,000,000 23,000,000
24,950,000 2015 24,000,000 950,000
68,100,000 2018 20,000,000 25,000,000 20,000,000 3,100,000
5,000,000 2018 5,000,000
20,000,000 2018 10,000,000 10,000,000
2,000,000 2018 1,000,000 1,000,000
6,810,000 2019 3,000,000 3,000,000 810,000
2,000,000 2019 1,000,000 1,000,000
25,000,000 2019 25,000,000
3,000,000 2019 2,000,000 1,000,000

40,000,000 2018 40,000,000


28,500,000 2019 10,000,000 8,500,000 10,000,000
45,000,000 2015 20,000,000 25,000,000
60,500,000 2020 20,000,000 20,000,000 20,500,000

5,109,340,000 615,000,000 2,489,640,000 1,555,190,000 217,500,000 131,000,000 101,010,000

25,000,000 2015 15,000,000 10,000,000


24,200,000 2015 20,000,000 4,200,000
8,000,000 2016 4,000,000 4,000,000
3,200,000 2015 3,200,000
40,000,000 2017 20,000,000 20,000,000

13,800,000 2015 5,000,000 8,800,000


60,500,000 2015 30,500,000 30,000,000
4,500,000 2015 4,500,000

58,000,000 2015 30,000,000 28,000,000


86,000,000 2016 86,000,000
40,000,000 2016 40,000,000
65,400,000 2015 65,400,000
85,200,000 2018 85,200,000
37,000,000 2018 37,000,000
20,200,000 2018 20,200,000

30,800,000 2015 20,000,000 10,800,000

32,000,000 2015 32,000,000


10,200,000 2015 10,200,000

59,800,000 2017 59,800,000

32,400,000 2017 32,400,000


16,400,000 2015 16,400,000
223,200,000 2017 223,200,000
241,000,000 2017 141,000,000 100,000,000
6,900,000 2018 6,900,000
5,100,000 2016 5,100,000
10,000,000 2016 10,000,000
11,475,000 2015 11,475,000
11,775,000 2018 11,775,000

42,000,000 2015 35,000,000 7,000,000


3,000,000 2016 3,000,000
10,000,000 2019 10,000,000

1,317,050,000 90,000,000 563,400,000 498,450,000 70,700,000 40,000,000 54,500,000


50,000,000 2015 50,000,000
54,000,000 2015 54,000,000
162,000,000 2016 100,000,000 62,000,000

266,000,000 50,000,000 - - 100,000,000 - 116,000,000

1,500,000,000 2015 1,000,000,000 500,000,000


17,500,000 2015 17,500,000
100,000,000 2017 50,000,000 50,000,000

508,000,000 2020 250,000,000 250,000,000 8,000,000

5,000,000 2016 5,000,000


3,000,000 2016 1,000,000 2,000,000
100,000,000 2015-2020 50,000,000 50,000,000

2,233,500,000 - 1,355,000,000 867,500,000 1,000,000 2,000,000 8,000,000

10,000,000 2016 10,000,000


10,000,000 2016 10,000,000

15,000,000 2016 15,000,000


36,000,000 2017 16,000,000 20,000,000
10,000,000 2018 10,000,000

5,000,000 2016 5,000,000

5,000,000 2016 5,000,000

5,000,000 2016 5,000,000


96,000,000 - 10,000,000 61,000,000 5,000,000 20,000,000 -

75,000,000 2016 75,000,000

10,000,000 2015 10,000,000


100,000,000 2016 50,000,000 50,000,000

185,000,000 - 50,000,000 10,000,000 125,000,000 - -

20,000,000 2015 20,000,000


6,000,000 2015 6,000,000
25,000,000 2015 15,000,000 10,000,000
20,000,000 2015 20,000,000
30,000,000 2015 30,000,000
10,000,000 2015 10,000,000

121,000,000 2016 25,000,000 25,000,000 21,000,000 50,000,000


10,000,000 2016 10,000,000
5,000,000 2016 5,000,000
70,000,000 2017 35,000,000 35,000,000
20,000,000 2018 20,000,000
10,000,000 2016 10,000,000
100,000,000 2019 50,000,000 50,000,000

20,000,000 2015 20,000,000

10,000,000 2016 10,000,000

477,000,000 95,000,000 150,000,000 155,000,000 21,000,000 50,000,000 6,000,000

9,683,890,000 850,000,000 4,618,040,000 3,147,140,000 540,200,000 243,000,000 285,510,000


RENCANA INVESTASI PENCEGAHAN DAN PENINGKATAN KUALITAS PERMUKIMAN
KELURAHAN MATTIROTAPPARENG

ESTIMASI BIAYA
NO KRITERIA/PROGRAM KEGIATAN LOKASI VOLUME APBN
(Rp x Juta)

A. FISIK
01 Kepadatan, Keteraturan & Perbaikan Rumah Tidak Layak Huni RW 001/RT 001 11 Unit 165,000,000 165,000,000
Kelayakan bangunan
RW 001/RT 002 4 Unit 60,000,000
RW 001/RT 003 13 Unit 195,000,000 195,000,000
RW 001/RT 004 44 Unit 660,000,000 660,000,000
RW 002/RT 001 20 Unit 300,000,000 300,000,000
RW 002/RT 002 35 Unit 525,000,000 525,000,000
RW 002/RT 004 28 Unit 420,000,000 420,000,000
RW 002/RT 005 22 Unit 330,000,000 330,000,000
RW 002/RT 006 25 Unit 375,000,000 375,000,000
Peremajaan lingkungan hunian RW 001/RT 003 1 Paket 50,000,000
RW 001/RT 004 1 Paket 50,000,000
02 Jalan Lingkungan Perbaikan Jalan Rabat beton Jl. Budi Utomo Lorong 3, 5 X 60 Meter 43,200,000
BTN Tae (Samping Poskeskel) 3, 5 X 30 Meter 21,600,000
BTN Tae (Belakang Poskeskel) 3, 5 X 100 Meter 72,000,000 72,000,000
Jl. Fastabiqul Khaerat Poros 3,5 X 170 Meter 122,400,000 122,400,000
Jl. Fastabiqul Khaerat 1 3,5 X 80 Meter 57,600,000 57,600,000
Jl. Fastabiqul Khaerat 2 3,5 X 80 Meter 57,600,000 57,600,000
Jl. Fastabiqul Khaerat 3 3,5 X 80 Meter 57,600,000 57,600,000
Jl. Beruang 3,5 X 500 Meter 360,000,000 360,000,000
Jl. Beruang 1 3,5 X 80 Meter 57,600,000 57,600,000
Jl. Beruang 2 3,5 X 80 Meter 57,600,000 57,600,000
Jl. Beruang 3 3,5 X 80 Meter 57,600,000 57,600,000
Jl. Beruang 4 3,5 X 50 Meter 36,000,000
Jalan Lingkungan Perbaikan Jalan Rabat beton Jl. Beruang 5 3,5 X 50 Meter 36,000,000
Jl. Beruang 6 3,5 X 170 Meter 122,400,000 122,400,000
Jl. Beruang 7 3,5 X 170 Meter 122,400,000 122,400,000
Jl. Beruang 8 3,5 X 170 Meter 122,400,000 122,400,000
ESTIMASI BIAYA
NO KRITERIA/PROGRAM KEGIATAN LOKASI VOLUME APBN
(Rp x Juta)
JL. Bukit Mattappa RT 2 Tae 3,5 X 80 Meter 57,600,000
Jl. Murni 4 X 300 Meter 216,000,000 216,000,000
JL. Fastabiqul Khaerat RT 4 Tae 3,5 X 100 Meter 72,000,000 72,000,000
Jl. Bukit Mattappa RT 4 Tae (Poros) 3,5 X 120 Meter 86,400,000 86,400,000
Jl. Bukit Mattappa RT 4 Tae Lr 1 3,5 X 100Meter 72,000,000 72,000,000
Jl. Bukit Mattappa RT 4 Tae Lr 2 3,5 X 50 Meter 36,000,000 36,000,000
Jl. Bukit Mattappa RT 4 Tae Lr 3 3,5 X 100 Meter 72,000,000 72,000,000
Jl. Bukit Mattappa RT 4 Tae Lr 4 3,5 X 200 Meter 144,000,000 144,000,000
Jl. Labandang RT 4 Tae 3,5 X 55 Meter 39,600,000 39,600,000
JL. Murni RT 4 Tae 3,5 X 300 Meter 216,000,000 216,000,000
Jl. Garuda RT 4 Tae 3,5 X 105 Meter 75,600,000 75,600,000
Jl. Merpati RT 4 Tae 3,5 X 90 Meter 64,800,000 64,800,000
Jl. Gelatik RT 4 Tae 3,5 X 55 Meter 39,600,000 39,600,000
JL. Bete 1 (Lanjutan) 3 X 70 Meter 50,400,000 50,400,000
JL. Bete 2 3 X 60 Meter 43,200,000
JL. Bete 4 (Lanjutan) 3 X 40 Meter 28,800,000
JL. Bete 5 3 X 60 Meter 43,200,000
JL. Bete 6 3 X 40 Meter 28,800,000
JL. Bete 7 3 X 40 Meter 28,800,000
JL. Jangko RT 3 Cappawengeng Lr. 1 3 X 75 Meter 54,000,000 54,000,000

JL. Jangko RT 3 Cappawengeng Lr. 2 3 X 50 Meter 36,000,000 36,000,000

JL. Jangko RT 3 Cappawengeng Lr. 3 3 X 50 Meter 36,000,000 36,000,000

JL. Jangko RT 3 Cappawengeng Lr. 4 3 X 50 Meter 36,000,000 36,000,000


ESTIMASI BIAYA
NO KRITERIA/PROGRAM KEGIATAN LOKASI VOLUME APBN
(Rp x Juta)
Jalan Lingkungan Perbaikan Jalan Rabat beton JL. Jangko RT 3 Cappawengeng Lr. 5 3 X 100 Meter 72,000,000 72,000,000
Jl. Belanak 1 3 X 100 Meter 72,000,000 72,000,000
Jl. Setapak 1 2 X 130 Meter 93,600,000 93,600,000
Jl. Setapak 2 2 X 70 Meter 50,400,000
Jl. Setapak 3 2 X 30 Meter 21,600,000
JL. Jangko Lorong RT 4 Cappawengeng 2 X 70 Meter 50,400,000
Jl. Setapak (Batas kelurahan Tempe) 3 X 60 Meter 43,200,000
Jl. Budi Utomo RT 6 Cappawengeng 3 X 90 Meter 64,800,000 64,800,000
Setapak 4
Jl. Budi Utomo RT 6 Cappawengeng 3 X 30 Meter 21,600,000
Setapak 5
Pengaspalan Jalan Jl. Gabus-Jl. Jangko 5 X 1000 Meter 1,200,000,000 1,200,000,000
Perintisan Jalan Jl. Budi Utomo RT 1 Cappawengeng 3,5 X 400 Meter 2,100,000
Peninggian Jalan Jl. Budi Utomo Lorong 3,5 X 60 Meter 150,000,000 150,000,000
03 Drainase Lingkungan Pembuatan Plat Penutup saluran Jl. Murni 50 Meter 15,000,000
Normalisasi saluran air Jl. Gabus-Jl. Jangko 1000 Meter 75,000,000 75,000,000
Pembangunan drainase Jl. Rusa 90 Meter 13,500,000
Jl. Budi Utomo Lorong 120 Meter 18,000,000
Jl. Budi Utomo 80 Meter 12,000,000
Jl. Fastabiqul Khaerat 1 30 Meter 4,500,000
Jl. Fastabiqul Khaerat 2 150 Meter 22,500,000
Jl. Fastabiqul Khaerat 3 150 Meter 22,500,000
Jl. Fastabiqul Khaerat 4 150 Meter 22,500,000
Jl. Fastabiqul Khaerat 9 200 Meter 30,000,000
Jl. Fastabiqul Khaerat 10 200 Meter 30,000,000
JL. Bukit Mattappa 100 Meter 15,000,000
Jl. Beruang 4 150 Meter 22,500,000
Jl. Beruang 9 200 Meter 30,000,000
Jl. Beruang 10 200 Meter 30,000,000
Drainase Lingkungan Pembangunan drainase Jl. Murni 70 Meter 10,500,000
Jl. Murni 1 80 Meter 12,000,000
Jl. Murni 2 80 Meter 12,000,000
ESTIMASI BIAYA
NO KRITERIA/PROGRAM KEGIATAN LOKASI VOLUME APBN
(Rp x Juta)
JL. Fastabiqul Khaerat RT 4 Tae 300 Meter 45,000,000
Jl. Bukit Mattappa RT 4 Tae (Poros) 240 Meter 36,000,000
Jl. Bukit Mattappa RT 4 Tae Lr 1 200 Meter 30,000,000
Jl. Bukit Mattappa RT 4 Tae Lr 2 100 Meter 15,000,000
Jl. Bukit Mattappa RT 4 Tae Lr 3 200 Meter 30,000,000
Jl. Bukit Mattappa RT 4 Tae Lr 4 400 Meter 60,000,000 60,000,000
Jl. Labandang RT 4 Tae 110 Meter 16,500,000
JL. Murni RT 4 Tae 300 Meter 45,000,000
Jl. Presiden RT 4 Tae 120 Meter 18,000,000
Jl. Garuda RT 4 Tae 210 Meter 31,500,000
Jl. Merpati RT 4 Tae 180 Meter 27,000,000 27,000,000
Jl. Gelatik RT 4 Tae 110 Meter 16,500,000
Jl. Gabus RT 4 Tae 110 Meter 16,500,000
Jl. Gabus RT 1 Cappawengwng 92 Meter 13,800,000
Jl. Sekolah 84 Meter 12,600,000
Jl. Jangko RT 1 Cappawengeng 90 Meter 13,500,000
JL Gabus RT 2 Cappawengeng 100 Meter 15,000,000
Jl Bete 1 280 Meter 42,000,000 42,000,000
Jl Bete 2 240 Meter 36,000,000 36,000,000
JL. Jangko RT 3 Cappawengeng 230 Meter 34,500,000 34,500,000
JL. Jangko RT 3 Cappawengeng Lr. 1 150 Meter 22,500,000 22,500,000
JL. Jangko RT 3 Cappawengeng Lr. 2 100 Meter 15,000,000
JL. Jangko RT 3 Cappawengeng Lr. 3 100 Meter 15,000,000
JL. Jangko RT 3 Cappawengeng Lr. 4 100 Meter 15,000,000
Drainase Lingkungan Pembangunan drainase JL. Jangko RT 3 Cappawengeng Lr. 5 200 Meter 30,000,000 30,000,000
Jl. Belanak 240 Meter 36,000,000 36,000,000
Jl. Belanak 1 200 Meter 30,000,000 30,000,000
Jl. Setapak 1 260 Meter 39,000,000 39,000,000
Jl. Setapak 2 140 Meter 21,000,000 21,000,000
Jl. Setapak 3 60 Meter 9,000,000
Jl. Kandia 100 Meter 15,000,000
ESTIMASI BIAYA
NO KRITERIA/PROGRAM KEGIATAN LOKASI VOLUME APBN
(Rp x Juta)
Jl. Kandia Setapak 1 200 Meter 30,000,000 30,000,000
Jl. Jangko RT 6 Cappawengeng 230 Meter 34,500,000 34,500,000
Jl. Budi Utomo RT 6 Cappawengeng 180 Meter 27,000,000 27,000,000
Setapak 4
Jl. Budi Utomo RT 6 Cappawengeng 60 Meter 9,000,000
Setapak 5
04 Sanitasi Lingkungan Pembuatan Jamban Keluarga RW 001/RT 001 7 Unit 21,000,000
RW 001/RT 003 21 Unit 63,000,000 63,000,000
RW 001/RT 004 30 Unit 90,000,000 90,000,000
RW 002/RT 001 16 Unit 48,000,000 48,000,000
RW 002/RT 002 39 Unit 117,000,000 117,000,000
RW 002/RT 003 26 Unit 78,000,000 78,000,000
RW 002/RT 004 16 Unit 48,000,000 48,000,000
RW 002/RT 005 3 Unit 9,000,000
RW 002/RT 006 20 Unit 60,000,000 60,000,000
05 Penyediaan Air Minum Pengadaan Sambungan PDAM baru Jl. Budi Utomo Lorong 60 Meter 6,000,000
Jl. Fastabiqul Khaerat Poros 3,5 X 170 Meter 17,000,000
Jl. Fastabiqul Khaerat 1 80 Meter 8,000,000
Jl. Fastabiqul Khaerat 2 80 Meter 8,000,000
Jl. Fastabiqul Khaerat 3 80 Meter 8,000,000
Jl. Beruang 1-8 1350 meter 135,000,000
JL. Bukit Mattappa 80 Meter 8,000,000
Pengadaan Sambungan PDAM baru JL. Budi Utomo RT 3 Tae 300 Meter 30,000,000
Jl. Murni 300 Meter 30,000,000
RT 04 1535 153,500,000
Penyediaan Air Minum Pengadaan Sambungan PDAM baru RT 01 180 Meter 18,000,000
JL. Bete 1 - 5 520 Meter 52,000,000 52,000,000
Jl. Gabus RT 2 Cappawengwng 180 Meter 18,000,000 18,000,000
JL. Jangko RT 3 Cappawengeng 230 Meter 23,000,000 23,000,000
Jl. Belanak 120 Meter 12,000,000 12,000,000
Jl. Belanak 1 100 Meter 10,000,000
Jl. Setapak 1 130 Meter 13,000,000
ESTIMASI BIAYA
NO KRITERIA/PROGRAM KEGIATAN LOKASI VOLUME APBN
(Rp x Juta)
Jl. Setapak 2 70 Meter 7,000,000
Jl. Setapak 3 30 Meter 3,000,000
Jl. Matappa 110 Meter 11,000,000
Jl. Pawenarri 110 Meter 11,000,000
Jl. Macan 85 Meter 8,500,000
RT 06 340 Meter 34,000,000 34,000,000
Pembangunan Hidran Umum JL. Murni RT3 Tae 3 Unit 45,000,000 45,000,000
RT 04 14 Unit 210,000,000 210,000,000
JL. Bete 1 - 5 5 Unit 75,000,000 75,000,000
Jl. Gabus RT 2 Cappawengwng 1 Unit 15,000,000
Jl. Belanak 5 Unit 75,000,000
Jl. Matappa 1 Unit 15,000,000
Jl. Pawenarri 1 Unit 15,000,000
Jl. Macan 1 Unit 15,000,000
RT 6 4 Unit 60,000,000 60,000,000
Pembangunan Sumur Dalam (Bor) Jl. Rusa 2 Unit 16,000,000
ESTIMASI BIAYA
NO KRITERIA/PROGRAM KEGIATAN LOKASI VOLUME APBN
(Rp x Juta)
Penyediaan Air Minum Pembangunan Sumur Dalam (Bor) Jl. Budi Utomo Lorong 1 Unit 8,000,000
JL. Bukit Mattappa 8 Unit 64,000,000 64,000,000
Jl. Fastabiqul Khaerat 4 Unit 32,000,000 32,000,000
JL. Budi Utomo RT 3 Tae 5 Unit 40,000,000 40,000,000
Pengadaan Pompa Air JL. Beruang 16 Unit 56,000,000 56,000,000
Jl. Budi Utomo Lorong 1 Unit 3,500,000
06 Pengelolaan Persampahan Pengadaan tong sampah pilah RW 001/RT 001 88 Unit 88,000,000 88,000,000
RW 001/RT 002 94 Unit 94,000,000 94,000,000
RW 001/RT 003 82 Unit 82,000,000 82,000,000
RW 001/RT 004 132 Unit 132,000,000 132,000,000
RW 002/RT 001 48 Unit 48,000,000 48,000,000
RW 002/RT 002 52 Unit 52,000,000 52,000,000
RW 002/RT 003 41 Unit 41,000,000 41,000,000
RW 002/RT 004 83 Unit 83,000,000 83,000,000
RW 002/RT 005 65 Unit 65,000,000 65,000,000
RW 002/RT 006 77 Unit 77,000,000 77,000,000
Pembangunan TPS RW 002/RT 002 2 Unit 10,000,000
RW 002/RT 004 2 Unit 10,000,000
Pengadaan motor gerobak sampah RW 001/RT 001 1 Unit 25,000,000 25,000,000
RW 001/RT 002 1 Unit 25,000,000 25,000,000
RW 001/RT 003 1 Unit 25,000,000 25,000,000
RW 001/RT 004 1 Unit 25,000,000 25,000,000
RW 002/RT 001 1 Unit 25,000,000 25,000,000
RW 002/RT 002 1 Unit 25,000,000 25,000,000
RW 002/RT 003 1 Unit 25,000,000 25,000,000
RW 002/RT 004 1 Unit 25,000,000 25,000,000
RW 002/RT 005 1 Unit 25,000,000 25,000,000
RW 002/RT 006 1 Unit 25,000,000 25,000,000
07 Pencegahan Bahaya Kebakaran Pengadaan Instalasi Pipa Hidrant Jl. Rusa 1000 Meter 15,000,000
Penyediaan Motor Pemadam Kebakaran RW 001/RT 001 1 Unit 25,000,000 25,000,000
RW 001/RT 002 1 Unit 25,000,000 25,000,000
RW 001/RT 003 1 Unit 25,000,000 25,000,000
ESTIMASI BIAYA
NO KRITERIA/PROGRAM KEGIATAN LOKASI VOLUME APBN
(Rp x Juta)
Pencegahan Bahaya Kebakaran Penyediaan Motor Pemadam Kebakaran RW 001/RT 004 1 Unit 25,000,000
RW 002/RT 001 1 Unit 25,000,000
RW 002/RT 002 1 Unit 25,000,000
RW 002/RT 003 1 Unit 25,000,000
RW 002/RT 004 1 Unit 25,000,000 25,000,000
RW 002/RT 005 1 Unit 25,000,000 25,000,000
RW 002/RT 006 1 Unit 25,000,000 25,000,000
08 Ruang Terbuka Hijau Penataan Lorong Hijau RW 001/RT 003 1 Paket 15,000,000 15,000,000
RW 001/RT 004 1 Paket 15,000,000 15,000,000
Pengadaan POT dan Tanaman RW 001/RT 001 88 Unit 22,000,000
RW 001/RT 002 94 Unit 23,500,000
RW 001/RT 003 82 Unit 20,500,000
RW 001/RT 004 132 Unit 33,000,000
RW 002/RT 001 48 Unit 12,000,000
RW 002/RT 002 52 Unit 13,000,000
RW 002/RT 003 41 Unit 10,250,000
RW 002/RT 004 83 Unit 20,750,000
RW 002/RT 005 65 Unit 16,250,000
RW 002/RT 006 77 Unit 19,250,000
09 Sarana dan Prasarana Umum Penerangan jalan gang. Jl. Rusa 4 Unit 12,000,000 12,000,000
Jl. Budi Utomo Lorong 2 Unit 6,000,000 6,000,000
JL. Bukit Mattappa 4 Unit 12,000,000 12,000,000
Jl. Fastabiqul Khaerat 4 Unit 12,000,000 12,000,000
Jl. Beruang 4 Unit 12,000,000 12,000,000
Jl. Murni RT 3 Tae 4 Unit 12,000,000 12,000,000
JL. Fastabiqul Khaerat RT 4 Tae 1 Unit 3,000,000
Jl. Bukit Mattappa RT 4 Tae (Poros) 1 Unit 3,000,000
Jl. Bukit Mattappa RT 4 Tae Lr 1 - Lr. 4 4 Unit 12,000,000 12,000,000
Jl. Labandang RT 4 Tae 1 Unit 3,000,000
Jl. Presiden RT 4 Tae 1 Unit 3,000,000
JL. Murni RT 4 Tae 2 Unit 12,000,000
Sarana dan Prasarana Umum Penerangan jalan gang. Jl. Garuda RT 4 Tae 1 Unit 3,000,000
ESTIMASI BIAYA
NO KRITERIA/PROGRAM KEGIATAN LOKASI VOLUME APBN
(Rp x Juta)
Jl. Merpati RT 4 Tae 1 Unit 3,000,000
Jl. Gelatik RT 4 Tae 1 Unit 3,000,000
Jl. Gabus RT 4 Tae 1 Unit 3,000,000
Jl. Jangko RT 1 Cappawengeng 2 Unit 6,000,000
Jl. Gabus RT 1 Cappawengeng 2 Unit 6,000,000
JL. Bete 1 - 5 5 Unit 15,000,000
Jl. Gabus RT 2 Cappawengwng 1 Unit 3,000,000
JL. Jangko RT 3 Cappawengeng 2 Unit 6,000,000
JL. Jangko RT 3 Cappawengeng Lr. 1 - lr. 5 5 Unit 15,000,000
Jl. Belanak 2 Unit 6,000,000
Jl. Setapak 1 - 3 3 Unit 9,000,000
JL. Jangko RT 4 Cappawengeng 2 Unit 6,000,000
Jl. Matappa 1 Unit 3,000,000
Jl. Pawenarri 1 Unit 3,000,000
Jl. Macan 1 Unit 3,000,000
JL. Setapak Batas Kel. Tempe 1 Unit 3,000,000
Jl. Jangko RT 6 Cappawengeng 2 Unit 6,000,000
Jl. Budi Utomo RT 6 Cappawengeng 1 Unit 3,000,000
Setapak 4
Jl. Budi Utomo RT 6 Cappawengeng 1 Unit 3,000,000
Setapak 5
Sub Total Fisik 12,882,400,000

B. EKONOMI
01 Peningkatan Ekonomi Modal Bergulir Kelurahan Mattirotappareng 23 Kelompok 230,000,000 115,000,000
Sub Total Ekonomi 230,000,000
ESTIMASI BIAYA
NO KRITERIA/PROGRAM KEGIATAN LOKASI VOLUME APBN
(Rp x Juta)

C. SOSIAL
Penyuluhan kesehatan lingkungan
01 Penyuluhan dan Pelatihan Kelurahan Mattirotappareng Ls 5,000,000
(PHBS)
Pengelolaan daur ulang sampah Kelurahan Mattirotappareng Ls 5,000,000
Pengelolaan Bank Sampah Kelurahan Mattirotappareng Ls 5,000,000

Penyuluhan Pencegahan Kebakaran Kelurahan Mattirotappareng Ls 5,000,000

Peningkatan Keterampilan sesuai Life Kelurahan Mattirotappareng Ls 50,000,000 50,000,000


Skill
Sub Total Sosial 70,000,000
Total Jumah 13,182,400,000

Sengkang, ……………………………... 2015

Mengetahui,
Pimpinan K
Lurah LKM MAT

……………………………………………... ………………………………
DAN PENINGKATAN KUALITAS PERMUKIMAN
MATTIROTAPPARENG

TAHUN
APBD\Kemitraan Masyarakat PELAKSANAAN

Thn 2017 - 2021


60,000,000 Thn 2017 - 2021
Thn 2017 - 2021
Thn 2017 - 2021
Thn 2017 - 2021
Thn 2017 - 2021
Thn 2017 - 2021
Thn 2017 - 2021
Thn 2017 - 2021
50,000,000 Thn 2017 - 2021
50,000,000 Thn 2017 - 2021
43,200,000 Thn 2017 - 2021
21,600,000 Thn 2017 - 2021
Thn 2017 - 2021
Thn 2017 - 2021
Thn 2017 - 2021
Thn 2017 - 2021
Thn 2017 - 2021
Thn 2017 - 2021
Thn 2017 - 2021
Thn 2017 - 2021
Thn 2017 - 2021
36,000,000 Thn 2017 - 2021
36,000,000 Thn 2017 - 2021
Thn 2017 - 2021
Thn 2017 - 2021
Thn 2017 - 2021
TAHUN
APBD\Kemitraan Masyarakat
PELAKSANAAN
57,600,000 Thn 2017 - 2021
Thn 2017 - 2021
Thn 2017 - 2021
Thn 2017 - 2021
Thn 2017 - 2021
Thn 2017 - 2021
Thn 2017 - 2021
Thn 2017 - 2021
Thn 2017 - 2021
Thn 2017 - 2021
Thn 2017 - 2021
Thn 2017 - 2021
Thn 2017 - 2021
Thn 2017 - 2021
43,200,000 Thn 2017 - 2021
28,800,000 Thn 2017 - 2021
43,200,000 Thn 2017 - 2021
28,800,000 Thn 2017 - 2021
28,800,000 Thn 2017 - 2021
Thn 2017 - 2021

Thn 2017 - 2021

Thn 2017 - 2021

Thn 2017 - 2021


TAHUN
APBD\Kemitraan Masyarakat
PELAKSANAAN
Thn 2017 - 2021
Thn 2017 - 2021
Thn 2017 - 2021
50,400,000 Thn 2017 - 2021
21,600,000 Thn 2017 - 2021
50,400,000 Thn 2017 - 2021
43,200,000 Thn 2017 - 2021
Thn 2017 - 2021

Thn 2017 - 2021


21,600,000
Thn 2017 - 2021
2,100,000 Thn 2017 - 2021
Thn 2017 - 2021
15,000,000 Thn 2017 - 2021
Thn 2017 - 2021
13,500,000 Thn 2017 - 2021
18,000,000 Thn 2017 - 2021
12,000,000 Thn 2017 - 2021
4,500,000 Thn 2017 - 2021
22,500,000 Thn 2017 - 2021
22,500,000 Thn 2017 - 2021
22,500,000 Thn 2017 - 2021
30,000,000 Thn 2017 - 2021
30,000,000 Thn 2017 - 2021
15,000,000 Thn 2017 - 2021
22,500,000 Thn 2017 - 2021
30,000,000 Thn 2017 - 2021
30,000,000 Thn 2017 - 2021
10,500,000 Thn 2017 - 2021
12,000,000 Thn 2017 - 2021
12,000,000 Thn 2017 - 2021
TAHUN
APBD\Kemitraan Masyarakat
PELAKSANAAN
45,000,000 Thn 2017 - 2021
36,000,000 Thn 2017 - 2021
30,000,000 Thn 2017 - 2021
15,000,000 Thn 2017 - 2021
30,000,000 Thn 2017 - 2021
Thn 2017 - 2021
16,500,000 Thn 2017 - 2021
45,000,000 Thn 2017 - 2021
18,000,000 Thn 2017 - 2021
31,500,000 Thn 2017 - 2021
Thn 2017 - 2021
16,500,000 Thn 2017 - 2021
16,500,000 Thn 2017 - 2021
13,800,000 Thn 2017 - 2021
12,600,000 Thn 2017 - 2021
13,500,000 Thn 2017 - 2021
15,000,000 Thn 2017 - 2021
Thn 2017 - 2021
Thn 2017 - 2021
Thn 2017 - 2021
Thn 2017 - 2021

15,000,000 Thn 2017 - 2021


15,000,000 Thn 2017 - 2021
15,000,000 Thn 2017 - 2021
Thn 2017 - 2021
Thn 2017 - 2021
Thn 2017 - 2021
Thn 2017 - 2021
Thn 2017 - 2021
9,000,000 Thn 2017 - 2021
15,000,000 Thn 2017 - 2021
TAHUN
APBD\Kemitraan Masyarakat
PELAKSANAAN
Thn 2017 - 2021
Thn 2017 - 2021
Thn 2017 - 2021

Thn 2017 - 2021


9,000,000

21,000,000 Thn 2017 - 2021


Thn 2017 - 2021
Thn 2017 - 2021
Thn 2017 - 2021
Thn 2017 - 2021
Thn 2017 - 2021
Thn 2017 - 2021
9,000,000 Thn 2017 - 2021
Thn 2017 - 2021
6,000,000 Thn 2017 - 2021
17,000,000 Thn 2017 - 2021
8,000,000 Thn 2017 - 2021
8,000,000 Thn 2017 - 2021
8,000,000 Thn 2017 - 2021
135,000,000 Thn 2017 - 2021
8,000,000 Thn 2017 - 2021
30,000,000 Thn 2017 - 2021
30,000,000 Thn 2017 - 2021
153,500,000 Thn 2017 - 2021
18,000,000 Thn 2017 - 2021
Thn 2017 - 2021
Thn 2017 - 2021
Thn 2017 - 2021
Thn 2017 - 2021
10,000,000 Thn 2017 - 2021
13,000,000 Thn 2017 - 2021
TAHUN
APBD\Kemitraan Masyarakat
PELAKSANAAN
7,000,000 Thn 2017 - 2021
3,000,000 Thn 2017 - 2021
11,000,000 Thn 2017 - 2021
11,000,000 Thn 2017 - 2021
8,500,000 Thn 2017 - 2021
Thn 2017 - 2021
Thn 2017 - 2021
Thn 2017 - 2021
Thn 2017 - 2021
15,000,000 Thn 2017 - 2021
75,000,000 Thn 2017 - 2021
15,000,000 Thn 2017 - 2021
15,000,000 Thn 2017 - 2021
15,000,000 Thn 2017 - 2021
Thn 2017 - 2021
16,000,000 Thn 2017 - 2021
TAHUN
APBD\Kemitraan Masyarakat
PELAKSANAAN
8,000,000 Thn 2017 - 2021
Thn 2017 - 2021
Thn 2017 - 2021
Thn 2017 - 2021
Thn 2017 - 2021
3,500,000 Thn 2017 - 2021
Thn 2017 - 2021
Thn 2017 - 2021
Thn 2017 - 2021
Thn 2017 - 2021
Thn 2017 - 2021
Thn 2017 - 2021
Thn 2017 - 2021
Thn 2017 - 2021
Thn 2017 - 2021
Thn 2017 - 2021
10,000,000 Thn 2017 - 2021
10,000,000 Thn 2017 - 2021
Thn 2017 - 2021
Thn 2017 - 2021
Thn 2017 - 2021
Thn 2017 - 2021
Thn 2017 - 2021
Thn 2017 - 2021
Thn 2017 - 2021
Thn 2017 - 2021
Thn 2017 - 2021
Thn 2017 - 2021
15,000,000 Thn 2017 - 2021
Thn 2017 - 2021
Thn 2017 - 2021
Thn 2017 - 2021
TAHUN
APBD\Kemitraan Masyarakat
PELAKSANAAN
25,000,000 Thn 2017 - 2021
25,000,000 Thn 2017 - 2021
25,000,000 Thn 2017 - 2021
25,000,000 Thn 2017 - 2021
Thn 2017 - 2021
Thn 2017 - 2021
Thn 2017 - 2021
Thn 2017 - 2021
Thn 2017 - 2021
22,000,000 Thn 2017 - 2021
23,500,000 Thn 2017 - 2021
20,500,000 Thn 2017 - 2021
33,000,000 Thn 2017 - 2021
12,000,000 Thn 2017 - 2021
13,000,000 Thn 2017 - 2021
10,250,000 Thn 2017 - 2021
20,750,000 Thn 2017 - 2021
16,250,000 Thn 2017 - 2021
19,250,000 Thn 2017 - 2021
Thn 2017 - 2021
Thn 2017 - 2021
Thn 2017 - 2021
Thn 2017 - 2021
Thn 2017 - 2021
Thn 2017 - 2021
3,000,000 Thn 2017 - 2021
3,000,000 Thn 2017 - 2021
Thn 2017 - 2021
3,000,000 Thn 2017 - 2021
3,000,000 Thn 2017 - 2021
12,000,000 Thn 2017 - 2021
3,000,000 Thn 2017 - 2021
TAHUN
APBD\Kemitraan Masyarakat
PELAKSANAAN
3,000,000 Thn 2017 - 2021
3,000,000 Thn 2017 - 2021
3,000,000 Thn 2017 - 2021
6,000,000 Thn 2017 - 2021
6,000,000 Thn 2017 - 2021
15,000,000 Thn 2017 - 2021
3,000,000 Thn 2017 - 2021
6,000,000 Thn 2017 - 2021
Thn 2017 - 2021
15,000,000
6,000,000 Thn 2017 - 2021
9,000,000 Thn 2017 - 2021
6,000,000 Thn 2017 - 2021
3,000,000 Thn 2017 - 2021
3,000,000 Thn 2017 - 2021
3,000,000 Thn 2017 - 2021
3,000,000 Thn 2017 - 2021
6,000,000 Thn 2017 - 2021
Thn 2017 - 2021
3,000,000
Thn 2017 - 2021
3,000,000

115,000,000 Thn 2017 - 2021


TAHUN
APBD\Kemitraan Masyarakat
PELAKSANAAN

5,000,000 Thn 2017 - 2021

5,000,000 Thn 2017 - 2021


5,000,000 Thn 2017 - 2021

5,000,000 Thn 2017 - 2021

Thn 2017 - 2021

Pimpinan Kolektif
LKM MATTIRO

………………………………………………………
RENCANA INVESTASI PENING
KELURAHA

NO KRITERIA/PROGRAM KEGIATAN

A. FISIK

Kepadatan, Keteraturan & Perbaikan Rumah tdk layak huni


1
Kelayakan bangunan

Peremajaan lingkungan hunian

2 Jalan Lingkungan Peninggian Jalan rabat beton

Pembangunan Jalan rabat beton

Perbaikan Jalan rabat beton

Pembangunan Jalan rabat beton

Pembangunan Jalan rabat beton

3 Drainase Lingkungan Pembuatan Plat Penutup saluran

Pembangunan drainase

Pemb. Dekker

4 Air Minum / Air Bersih Pengadaan Sambungan PDAM baru

Pembangunan Hidran Umum

Pembangunan Sumur Dalam (Bor)

5 Sanitasi Lingkungan Pembuatan Jamban Keluarga


6 Pengelolaan Sampah Pengadaan tong sampah pilah

Pengadaan motor gerobak sampah

Penyediaan Motor Pemadam


7 Penanganan Kebakaran Kebakaran
8 Ruang Terbuka Hijau Penataan Lorong Hijau
Pengadaan POT dan Tanaman

Pembuatan Gazebo (RTP)

9 Fasilitas Umum Penerangan jalan gang.

TOTAL
CANA INVESTASI PENINGKATAN KUALITAS PERMUKIMAN KUMUH
KELURAHAN MATTIROTAPPARENG

LOKASI VOLUME TOTAL APBN

RW 001/RT 003 13 Unit


Rp 195,000,000 Rp 195,000,000
RW 001/RT 003 1 Paket Rp 50,000,000 Rp 50,000,000
JL. Murni poros RT 3 Tae 5 X 250 Meter
Rp 180,000,000 Rp 180,000,000
Jl. Murni setapak 2 X 300 Meter
Rp 150,000,000
Jl. Labandang RT 4 Tae 3,5 X 55 Meter Rp 39,600,000
Jl. Murni lanjtan 5 X 50 Meter
Rp 36,000,000

Di Pinggir Sungai RT 3 Tae 4 X 200 Meter


Rp 164,800,000
Jl. Murni 480 Meter
Rp 144,000,000 Rp 144,000,000
Jl. Murni setapak 1 120 Meter Rp 18,000,000 Rp 18,000,000
Jl. Murni setapak 2 120 Meter Rp 18,000,000 Rp 18,000,000
Jl. Murni setapak 3 120 Meter Rp 18,000,000 Rp 18,000,000
Jl. Murni setapak 4 120 Meter Rp 18,000,000 Rp 18,000,000
JL. Murni poros RT 3 Tae 300 Meter
Rp 45,000,000 Rp 45,000,000
JL. Murni RT 3 Tae 7 unit Rp 14,000,000
Jl. Murni 250 Meter
Rp 25,000,000
Jl. Labandang RT 4 Tae 55 Meter Rp 5,500,000
JL. Murni RT3 Tae 3 Unit Rp 45,000,000 Rp 45,000,000
Jl. Labandang RT 4 Tae 1 Unit Rp 15,000,000 Rp 15,000,000
JL. Budi Utomo RT 3 Tae 5 Unit
Rp 40,000,000
RW 001/RT 003 21 Unit Rp 63,000,000 Rp 63,000,000
RW 001/RT 003 82 Unit Rp 82,000,000 Rp 82,000,000
RW 001/RT 003 1 Unit
Rp 25,000,000
RW 001/RT 003 1 Unit
Rp 25,000,000
RW 001/RT 003 1 Paket Rp 15,000,000 Rp 15,000,000
RW 001/RT 003 82 Unit Rp 20,500,000

RW 001/RT 003 1 Unit


Rp 8,000,000
Jl. Murni RT 3 Tae 4 Unit
Rp 12,000,000
Jl. Labandang RT 4 Tae 1 Unit Rp 3,000,000
Rp 1,474,400,000
KUMUH

TAHUN
APBD\Kemitraan Masyarakat PELAKSANAAN

2017

2017

2018

2017
Rp 150,000,000
Rp 39,600,000 2018

2017
Rp 36,000,000

2019-2019
Rp 164,800,000
2018

2017
2017
2017
2018

2018

Rp 14,000,000

Rp 25,000,000
Rp 5,500,000
2017-2018
2019

2017-2018
Rp 40,000,000
2017
2017-2019

2017
Rp 25,000,000
2019
Rp 25,000,000
2019
Rp 20,500,000 2019

2019

2018
Rp 12,000,000
Rp 3,000,000 2019
RENCANA PEMBIAYAAN RPLP TAHUN 2017 - 2021
KELURAHAN PURANGI, KEC. SENDANA, KOTA PALOPO

No Sektor/Program Rincian Kegiatan Lokasi Volume Satuan

(1) (2) (3) (4) (5) (6)


A PENATAAN LINGKUNGAN PERMUKIMAN
1 Penataan Bangunan Hunian 1 Normalisasi RT.02/RW.05-RT.02/RW.06 545 Meter
2 Talud RT.02/RW.05-RT.02/RW.06 1090 Meter
3 Jalan Setapak RT.02/RW.05-RT.02/RW.06 545 Meter
4 Jembatan RT.02/RW.05-RT.02/RW.06 3 Unit
5 Penghijauan Sempadan Sungai RT.02/RW.05-RT.02/RW.06 117 Pohon
6 Papan Informasi & Aturan Bersama RT.02/RW.05-RT.02/RW.06 4 Unit
7 Pengecatan Talud RT.02/RW.05-RT.02/RW.06 1090 Meter
8 Pagar Pengaman Sungai RT.02/RW.05-RT.02/RW.06 545 Meter

2 Ruang Terbuka Hijau 1 Taman Bermain RT.02/RW.05 1 Unit


2 Taman Bermain dan Lap. Bulutangkis RT.02/RW.06 1 Unit
3 Taman Bermain RT.01/RW.06 1 Unit

4 Taman Lingkar Kaw. Sentra Pertanian Terpadu RT.02/RW.05 2 Unit

5 Taman Lingkar (Kolam Sumur Tua) RT.01/RW.06 1 Unit

3 Fasilitas Umum 1 PAUD + Taman Bermain RT.02/RW.06 1 Unit


2 Posyandu RT.02/RW.06 1 Unit
3 Rehab Posyandu RT.02/RW.05 1 Unit

4 Jalan dan Jembatan 1 Jalan Setapak Samping Sungai(J1) RT.01/RW.06 250 Meter
2 Pembentukan Badan Jalan (J2) + PlatDekker RT.01/RW.06-RT.01/RW.05 400 Meter
3 Jalan Setapak (J3) RT.01/RW.05 90 Meter
4 Jalan Setapak (J4) RT.01/RW.05 180 Meter
5 Jalan Setapak Samping Sungai (J5) RT.01/RW.06 130 Meter
6 Jalan Setapak (J6) RT.01/RW.06 85 Meter
7 Jalan Setapak (J7) RT.01/RW.06 195 Meter
8 Pembentukan Badan Jalan (J8) RT.01/RW.06 485 Meter

9 Pembentukan Badan Jalan Samping Sungai (J9) RT.02/RW.06 330 Meter

10 Pembentukan Badan Jalan (J10) RT.02/RW.06 152 Meter

11 Jalan Setapak (J11) RT.02/RW.06 60 Meter


12 Pembentukan Badan Jalan (J12) RT.02/RW.05 110 Meter

13 Pengembangan Jalan Kaw. Sentra Pertanian RT.02/RW.05 440 Meter


Terpadu (J13)
14 Jalan Setapak (J14) RT.02/RW.05 155 Meter
15 Jalan Setapak Samping Sungai (J15) RT.02/RW.06 635 Meter
16 Pengaspalan Jalan (J16) RT.02/RW.06 1578 Meter
17 Jalan Setapak (J17) RT.02/RW.06 37 Meter
18 Jembatan Batas Purangi Sendana 1 Unit
19 Plat Dekker RT02/RW.06 1 Unit

5 Hunian 1 Rehab Rumah Semua RT 34 Unit


2 Pagar Seragam Semua RT 123 Unit
6 Penataan Pedestrian 1 Pengecatan Drainase Jl. Opu Tohalide 998 Meter
2 Trotoar Jl. Opu Tohalide 454 Meter
3 Penghijauan Sempadan Jalan Jl. Opu Tohalide 100 Pohon
4 Halte Jl. Opu Tohalide 2 Unit
5 Rambu Jalan Jl. Opu Tohalide 4 Unit
6 Marka Jalan Jl. Opu Tohalide 454 Meter
7 Papan Informasi & Aturan Bersama Jl. Opu Tohalide 2 Unit
8 Pot Bunga Jl. Opu Tohalide 50 unit
9 Tugu Penanda Kawasan Prioritas Jl. Opu Tohalide 2 Unit

7 Penerangan Kawasan 1 Lampu Jalan Utama Jl. Opu Tohalide 8 Unit


2 Lampu Jalan Lingkungan Semua RT 19 Unit
3 Penerangan Jalan Bantaran Sungai RT.02/RW.05-RT.02/RW.06 27 Unit
4 Lampu Pekarangan Semua RT 123 Unit

SUB TOTAL A
B PENYEHATAN LINGKUNGAN PERMUKIMAN
1 Pengelolahan Sampah 1 Bank Sampah RT.02/RW.06 1 Unit
2 Tempat Sampah Rumah Tangga Semua RT 121 Unit
3 Bak Sampah Komunal Semua RT 4 Unit
4 Bor Biopori Semua RT 16 Unit
5 Motor Sampah Semua RT 1 Unit

2 SPAL 1 Perpipaan SPAL Semua RT 69 Paket


2 Bak Penyaring Semua RT 123 Unit
3 Bidang Peresapan (Sumur Resapan) Semua RT 15 Unit

3 Pembangunan Drainase 1 Saluran Drainase (d1) RT.01/RW.06 290 Meter


2 Saluran Drainase (d2) RT.01/RW.06 430 Meter
3 Saluran Drainase (d3) RT.01/RW.06 200 Meter
4 Saluran Drainase (d4) RT.02/RW.06 327 Meter
5 Saluran Drainase (d5) RT.01/RW.06-RT.01/RW.05 426 Meter
6 Saluran Drainase (d6) RT.01/RW.05 185 Meter
7 Saluran Drainase (d7) RT.01/RW.05 101 Meter

8 Pembangunan dan Rehab Saluran Drainase (d8) RT.02/RW.06-RT.02/RW.05 154 Meter

9 Saluran Drainase (d9) RT.02/RW.05 160 Meter


10 Saluran Drainase (d10) RT.02/RW.05 51 Meter

11 Saluran Drainase Kaw. Sentra Pertanian Terpadu RT.02/RW.05 299 Meter


(d11)

12 Saluran Drainase (d12) RT.02/RW.05 162 Meter


13 Saluran Drainase (d13) RT.02/RW.05 82 Meter
14 Saluran Drainase (d14) RT.02/RW.05 1116 Meter
15 Saluran Drainase (d15) RT.02/RW.05-RT.02/RW.06 1205 Meter
16 Riol (r1) RT.01/RW.06 92 Meter
17 Riol (r2) RT.01/RW.06 68 Meter
18 Riol (r3) RT.02/RW.06 135 Meter
19 Riol (r4) RT.02/RW.06 153 Meter
20 Riol (r5) RT.01/RW.05 157 Meter

4 Jamban 1 Jamban Keluarga Semua RT 12 Unit


2 Rehab MCK Umum RT.02/RW.06 1 Unit
3 MCK Umum RT.01/RW.06 1 Unit

SUB TOTAL B
C PENGEMBANGAN AIR MINUM
1 Sarana Air Minum 1 Hidran Umum Semua RT 5 Unit
2 Wadah Penyaring Semua RT 108 Unit
3 Sambungan PDAM Semua RT 108 Rumah

SUB TOTAL C
D PENANGULANGAN BENCANA
1 Longsor Batas Kelurahan 1 Talud+Bronjong Batas Purangi Sendana 500 Meter
2 Normalisasi Sungai Batas Purangi Sendana 250 Meter
3 Reling Pengaman Batas Purangi Sendana 100 Meter

2 Longsor Sungai Salangka 1 Talud RT.02/RW.06 1270 Meter

3 Sosialisasi dan Bantuan 1 Penyuluhan dan Sosialisasi Bencana Semua RT 1 Paket


2 Media Sosialisasi Bencana Semua RT 1 Paket
3 Pegadaan Bibit Hutan Semua RT 1 Paket

SUB TOTAL D
E PENGEMBANGAN SOSIAL
1 Pendidikan Formal 1 Program Paket B Semua RT 1 Paket
2 Program Paket C Semua RT 1 Paket

2 Pendidikan Nonformal 1 Pelatihan Menjahit Semua RT 3 Kelompok


2 Bantuan Mesin Jahit Semua RT 3 Kelompok
3 Pelatihan Meubel Semua RT 1 Kelompok

3 Kesehatan 1 Penyuluhan Kesehatan Lingkungan Semua RT 1 Paket

2 Penyuluhan KB, Kesehatan ibu hamil dan balita. Semua RT 1 Paket

4 Kelembagaan 1 Peningkatan Kapasitas Kelembagaan Kawasan 1 Paket


SUB TOTAL E
F PENGEMBANGAN EKONOMI
1 Ekonomi Kawasan 1 Modal Usaha Pengembangan Pertanian Semua RT 3 Kelompok

2 Ekonomi Rumah Tangga 1 Pelatihan Pembuatan Makanan Ringan Semua RT 1 Paket


2 Modal Usaha Rumah Tangga Semua RT 4 Kelompok

SUB TOTAL F
G PENGEMBANGAN PERTANIAN
1 Kebun Percontohan 1 Balai Tani RT.02/RW.05 1 Unit
2 Pemagaran RT.02/RW.05 120 Meter
3 Green House (Rumah Benih) RT.02/RW.05 2 Unit
4 Rumah Kompos RT.02/RW.05 1 Unit
5 Budidaya Jamur Tiram RT.02/RW.05 1 Unit
6 Sarana Air Bersih RT.02/RW.05 1 Unit

2 Bantuan Pertanian 1 Pemanfaatan Lahan Pekarangan Semua RT 121 Paket


2 Pengadaan Bibit Pertanian Semua RT 1 Paket
3 Pupuk Semua RT 1 Paket
4 Traktor Kebun RT.02/RW.05 2 Unit
5 Alat Pertanian Semua RT 1 Paket
6 Media Pembibitan Jamur RT.02/RW.05 1 Unit
7 Embung RT.02/RW.05 1 Unit

3 Pendidikan Pertanian 1 Penyuluhan Pertanian Semua RT 1 Paket

2 Semua RT 1 Paket
Pelatihan Pembuatan Pupuk dan Obat Hama

SUB TOTAL G
JUMLAH TOTAL
P TAHUN 2017 - 2021
NDANA, KOTA PALOPO

Rencana Pembiayaan Tahun


APBN APBD Masyarakat
(7) (8) (10) (11) (15)

40,950,000 2015 40,950,000


580,000,000 2015 130,000,000
60,000,000 2015
25,000,000 2015
5,850,000 2016 5,000,000 850,000
8,000,000 2015
21,800,000 2016 1,800,000
285,000,000 2017 185,000,000 100,000,000

30,000,000 2017 30,000,000


35,000,000 2015
30,000,000 2018 30,000,000

60,000,000 2017 30,000,000

30,000,000 2018 30,000,000

40,000,000 2016
25,000,000 2019 25,000,000
10,000,000 2015 10,000,000

25,000,000 2019 25,000,000


40,000,000 2015 15,000,000
9,000,000 2018 9,000,000
18,000,000 2018 18,000,000
13,000,000 2018 13,000,000
8,500,000 2016 8,500,000
19,500,000 2016 19,500,000
32,000,000 2016 32,000,000

21,780,000 2016
21,780,000

15,200,000 2015 15,200,000

6,000,000 2015
7,260,000 2015 7,260,000

57,640,000 2017 57,640,000

15,500,000 2017 15,500,000


63,500,000 2020 33,500,000 30,000,000
2,367,000,000 2020 1,500,000,000 867,000,000
5,000,000 2015
300,000,000 2020 300,000,000
5,000,000 2015

340,000,000 2016 290,000,000 50,000,000


123,000,000 2017 23,000,000
24,950,000 2015 950,000
68,100,000 2018 20,000,000 25,000,000 3,100,000
5,000,000 2018 5,000,000
20,000,000 2018
2,000,000 2018
6,810,000 2019 3,000,000 3,000,000 810,000
2,000,000 2019
25,000,000 2019 25,000,000
3,000,000 2019

40,000,000 2018 40,000,000


28,500,000 2019 10,000,000
45,000,000 2015 20,000,000
60,500,000 2020 20,500,000

5,109,340,000 2,489,640,000 1,555,190,000 101,010,000

25,000,000 2015
24,200,000 2015 4,200,000
8,000,000 2016 4,000,000
3,200,000 2015
40,000,000 2017

13,800,000 2015 5,000,000 8,800,000


60,500,000 2015 30,000,000
4,500,000 2015 4,500,000

58,000,000 2015 28,000,000


86,000,000 2016 86,000,000
40,000,000 2016 40,000,000
65,400,000 2015 65,400,000
85,200,000 2018 85,200,000
37,000,000 2018 37,000,000
20,200,000 2018 20,200,000

30,800,000 2015 20,000,000 10,800,000

32,000,000 2015 32,000,000


10,200,000 2015 10,200,000

59,800,000 2017 59,800,000

32,400,000 2017 32,400,000


16,400,000 2015 16,400,000
223,200,000 2017 223,200,000
241,000,000 2017 141,000,000 100,000,000
6,900,000 2018 6,900,000
5,100,000 2016 5,100,000
10,000,000 2016
11,475,000 2015 11,475,000
11,775,000 2018 11,775,000

42,000,000 2015 7,000,000


3,000,000 2016
10,000,000 2019 10,000,000

1,317,050,000 563,400,000 498,450,000 54,500,000


50,000,000 2015
54,000,000 2015 54,000,000
162,000,000 2016 62,000,000

266,000,000 - - 116,000,000

1,500,000,000 2015 1,000,000,000 500,000,000


17,500,000 2015 17,500,000
100,000,000 2017 50,000,000 50,000,000

508,000,000 2020 250,000,000 250,000,000 8,000,000

5,000,000 2016 5,000,000


3,000,000 2016
100,000,000 2015-2020 50,000,000 50,000,000

2,233,500,000 1,355,000,000 867,500,000 8,000,000

10,000,000 2016 10,000,000


10,000,000 2016 10,000,000

15,000,000 2016 15,000,000


36,000,000 2017 16,000,000
10,000,000 2018 10,000,000

5,000,000 2016 5,000,000

5,000,000 2016 5,000,000

5,000,000 2016
96,000,000 10,000,000 61,000,000 -

75,000,000 2016

10,000,000 2015 10,000,000


100,000,000 2016 50,000,000

185,000,000 50,000,000 10,000,000 -

20,000,000 2015
6,000,000 2015 6,000,000
25,000,000 2015 10,000,000
20,000,000 2015
30,000,000 2015
10,000,000 2015

121,000,000 2016 25,000,000 25,000,000


10,000,000 2016 10,000,000
5,000,000 2016 5,000,000
70,000,000 2017 35,000,000 35,000,000
20,000,000 2018 20,000,000
10,000,000 2016 10,000,000
100,000,000 2019 50,000,000 50,000,000

20,000,000 2015 20,000,000

10,000,000 2016 10,000,000

477,000,000 150,000,000 155,000,000 6,000,000

9,683,890,000 4,618,040,000 3,147,140,000 285,510,000