Galian Tanah

V = 1.05 X 0.60 X 58.00


= 36.54 X 2 SISI (kiri dan kanan)
= 73.08

Pas. Batu Gunung


Pondasi Untuk Talud Dinding Untuk Talud
V = 0.3 X 0.40 X 58.00 V =
= 6.96 X 2 SISI (kiri dan kanan) =
= 13.92 =

Pondasi Untuk Drainase Dinding Untuk Drainase


V = 0.3 X 0.30 X 58.00 V =
= 5.22 X 2 SISI (kiri dan kanan) =
= 10.44 =

Lantai saluran dari beton


V = 0.35 X 0.10 X 58.00
= 2.03 X 2 SISI (kiri dan kanan)
= 4.06

Sirtu
V = 2.75 X 0.23 X 58.00
= 36.69

Lantai Kerja
V = 2.75 X 0.07 X 58.00
= 11.17

Beton
V = 3.25 X 0.20 X 58.00
= 37.70
Dinding Untuk Talud
0.325 X 0.90 X 58.00
16.97 X 2 SISI (kiri dan kanan)
33.93

Dinding Untuk Drainase


0.25 X 0.60 X 58.00
8.70 X 2 SISI (kiri dan kanan)
17.4
Lantai Kerja
V = 2.5 X 0.07 X 68.00
= 11.90

Beton
V = 2.5 X 0.20 X 68.00
= 34.00
Sirtu
V = 3.3 X 0.05 X 172.00
= 28.38

Lantai Kerja
V = 3.5 X 0.07 X 172.00
= 42.14

Beton
V = 3.5 X 0.20 X 192.00
= 134.40

Pondasi Untuk Drainase Dinding Untuk Drainase


V = 0.3 X 0.30 X 58.00 V =
= 5.22 X 2 SISI (kiri dan kanan) =
= 10.44 =
Dinding Untuk Drainase
0.25 X 0.60 X 58.00
8.70 X 2 SISI (kiri dan kanan)
17.4