No. Uraian Pekerjaan Satuan Sketsa & P

1. Galian Tanah M3 P x
138.9 x

2 Urugan Tanah M3 P x
138.9 x

3 Urugan Sirtu M3 P x
138.9 x

t
4 Pasangan Batu M3
V1 =
=
=
=

V2 =
=
=
=

VT =
=
=

t 1

5 Lantai Kerja M3
v= P
v= 138.9
v= 22.363

6 Jalan Beton M3
v= P
v= 138.9
v= 58.338

t
L

6 Plesteran M3
v= P
v= 138.9
v= 98.22

6 Bekisting M3
v= t
v= 0.15
v= 41.67

Diverifikasi Oleh : Diverifikasi O


Faskel Teknik, UPL,

( ..........................) ( ...................
l Pemberdayaan Masyarakat Mandiri Perkotaan
NGAN VOLUME / KUANTITAS PEKERJAAN

Jenis Kegiatan : ________________


Volume : ________________
Lokasi : ________________

Volume/
Sketsa & Perhitungan Volume Pekerjaan Kuantitas
L x t x 2 Sisi x 8.334
0.15 x 0.2 x 2 = M3
4.167 x 2 = 8.334 M3
Sketsa

Timb. Tanah t = 0.18 Cm


L x t 57.505
2.3 x 0.18 = M3
57.505 = 57.505 M3
Sketsa

Urugan Sirtu t = 10 Cm
L x t 31.947
2.3 x 0.1 = M3
31.947 = 31.947 M3
Sketsa

L
32.642
P x L x t M3
138.9 x 0.25 x 0.35
12.154 x 2 Sisi
24.308 m3

P x L x t Pas. Batu Gunung 1:4


138.9 x 0.15 x 0.2
4.167 x 2 Sisi
8.334 m3

V1 + V2
24.308 x 8.334
32.642 M3

1
Lantai Kerja K125
2 t

t
L L

22.363
x L x t L M3
x 2.3 x 0.07
m3

Sketsa
Jalan Beton K250

58.338
x L x t M3
x 2.8 x 0.15
m3

Sketsa
L
L

Plesteran 1 : 3 98.220
x L x 2 Sisi M2
x 0.3536 x 2 98.22
m3 138.9
2
Bekisting 0.353564

20.835
x P x 2 Sisi M2
x 138.9 x 2
2 Kali Pakai 20.835

Sketsa

Diverifikasi Oleh : Diverifikasi Oleh :


UPL, Ketua KSM,

( ..........................) ( ..........................)
L

10.4175
Program Nasional Pemberdayaan Masyarakat Mandiri Perkota
DAFTAR KUANTITAS PEKERJAAN

Kabupaten
Kecamatan : ________________
Kelurahan/Desa : ________________
KSPM/Panitia : ________________

No. Uraian Pekerjaan

1 Persiapan/Administrasi
2 Galian Tanah
3 Urugan Tanah
4 Urugan Sirtu
5 Pasangan Batu
6 Lantai Kerja
7 Jalan Beton
8 Plesteran
9 Bekisting

Diverifikasi Oleh : Diverifikasi Oleh :


Faskel Teknik, UPL,

( ..........................) ( ..........................)
n Masyarakat Mandiri Perkotaan
ITAS PEKERJAAN

Jenis Kegiatan : ________________


Volume : ________________
Lokasi : ________________

Satuan Volume/
Kuantitas
Ls 1.00
M3 8.33
M3 57.50
M3 31.95
M3 32.64
M3 22.36
M3 58.34
M2 98.22
M2 20.84

kasi Oleh : Diverifikasi Oleh :


UPL, Ketua KSM,

................) ( ..........................)
Program Nasion
PERHI

Kabupaten
Kecamatan : ________________
Kelurahan/Desa : ________________
KSPM/Panitia : ________________

Volume
No. Analisa Sat Koefisien Pekerjaan

I Pekerjaan Administrasi Ls 1.000 1.00

A. Galian Tanah 8.33


Tenaga
Pekerja OH 0.750
Mandor OH 0.025
B Timbunan Tanah M3 57.50
Tenaga
Pekerja OH 0.250
Mandor OH 0.025
Bahan
Tanah Timbunan M3 1.200
C Pengurugan Sirtu M3 31.95
Tenaga
Pekerja OH 0.250
Mandor OH 0.025
Bahan
Sirtu m3 1.200
D Pasangan Batu Gunung 1:4 32.64
Tenaga
Pekerja OH 1.500
Tukang batu OH 0.750
Kepala tukang OH 0.075
Mandor OH 0.075
Bahan
Batu belah m3 1.200
Semen Portland Kg 163.000
Pasir pasang m3 0.520
E Plesteran 1:3 98.22
Tenaga
Pekerja OH 0.300
Tukang batu OH 0.150
Kepala tukang OH 0.015
Mandor OH 0.015
Bahan
Semen Kg 7.776
Pasir Pasang m3 0.023
F Lantai Kerja (K125) 22.36
Tenaga
Pekerja OH 1.323
Tukang batu OH 0.189
Kepala tukang OH 0.019
Mandor OH 0.132
Bahan
Semen kg 276.000
1400 Portland
Pasir
1350 Kerikilbeton m3 0.591
m3 0.750
(Maks
Air 30mm) Liter 215.000
Alat
Beton Molen Sewa/Hari 0.250
G Jalan Beton (K250) 58.34
Tenaga
Pekerja OH 1.323
Tukang batu OH 0.189
Kepala tukang OH 0.019
Mandor OH 0.132
Bahan
Semen Portland kg 384.000
1400 Kerikil
Pasir beton m3 0.494
1350 (Maksimum m3 0.770
Air
30mm) Liter 215.000
Alat
Beton Molen Sewa/Hari 0.250
H Pekerjaan Bekisting 20.84
Tenaga
Pekerja OH 0.520
Tukang kayu OH 0.260
Kepala tukang OH 0.026
Mandor OH 0.026
Bahan
Kayu kelas III m3 0.045
Paku 5 cm – 10 cm kg 0.300
Minyak bekisting Liter 0.100

Diverifikasi Oleh :
Faskel Teknik,

( ..........................)
Program Nasional Pemberdayaan Masyarakat Mandiri Perkotaan
PERHITUNGAN VOLUME / KUANTITAS PEKERJAAN

Kebutuhan
Tenaga Bahan
Kepala
Pekerja Tukang Mandor Tanah Timb. Batu Gunung Sirtu Pasir Pasang Pasir Beton Semen
tukang

6.251
0.208

14.376
1.438

69.006

7.987
0.799

38.336

48.962
24.481
2.448
2.448

39.170
5320.565
16.974

29.466
14.733
1.473
1.473

763.759
2.259

29.586
4.227
0.425
2.952

6172.160
13.226

77.181
11.026
1.108
7.701

22401.792
28.836

10.834
5.417
0.542
0.542

224.643 59.884 5.996 17.560 69.006 39.170 38.336 19.233 42.062 34658.276

Diverifikasi Oleh : 693.165512


UPL,

( ..........................)
n

Jenis Kegiatan : _______ : ________________


Volume : _______ : ________________
Lokasi : _______ : ________________

Bahan
Minyak Kayu
Batu Pecah Air Cor Beton Molen Paku Bekisting Perancah
16.764
4808.024

5.591

44.899
12542.670

14.585

0.938
6.251
2.084

61.663 17350.694 20.175 6.251 2.084 0.938


Tanah Timb.
Batu Gunung
Diverifikasi Oleh : Sirtu
Ketua KSM, Pasir Pasang
Pasir Beton
Semen
Batu Pecah
( ..........................) Air Cor
Paku
Minyak Bekisting
Kayu Perancah
Beton Molen
Real

68 Pekerja 225.000
36 Tukang 60.000
36
16
40
693.000
60
17351.000
6.000
2.000
1.000
20.000
RENCANA ANGGARAN BIAYA SWADAYA DAN BDI KOTAKU

Kabupaten : ________________________ No. R A B


Kecamatan : ________________________ Jenis Kegiatan
Kelurahan/Desa : ________________________ Volume
Nama KSM : ________________________ Lokasi

Volume Kebutuhan
No Uraian Satuan Dari Dari
Total Swadaya BDI KOTAKU
(1) (2) (3) (4) (5) (6)=(4)-(5)

1 TENAGA KERJA :
Ketua Klp/Mandor HOK
Kepala Tukang HOK
Tukang HOK 60
Pekerja HOK 225
Sub Total Tenaga Kerja (1)
2 BAHAN :
Tanah Timb. M3 92,500 - 68.00
Batu Gunung M3 237,500 - 36.00
Sirtu M3 225,000 - 36.00
Pasir Pasang M3 75,000 - 16.00
Pasir Beton M3 187,500 - 40.00
Semen Zak 65,000 - 693.00
Batu Pecah M3 325,000 - 60.00
Air Cor Liter 50 - 17000.00
Paku Kg 15,000 - 6.00
Minyak Bekisting Liter 52,000 - 2.00
Kayu Perancah M3 2,235,000 - 1.00
Sub Total Tenaga Kerja (2)
3 ALAT :
Beton Molen Sewa/hari 20
Sub Total Tenaga Kerja (3)
4 BIAYA ADMINISTRASI :
1 Papan Nama Proyek 100,000 - 1
2 Administrasi Harian/Mingguan 60,000 - 1
3 Pelaporan KSM 53,000 - 1
4 Photo Copy/Penggandaan 100,000 - 1
5 Biaya Alat Tulis Kantor (ATK) 30,000 - 1
6 Photo Kegiatan (0%,50%,100%) 50,000 - 1
7 Materai 7,000 - 1
8 Prasasti 350,000 - 1
Sub Total Tenaga Kerja (4)
5 DANA TUNAI :
Uang
Sub Total Tenaga Kerja (5)
6 TANAH/TANAMAN :
Tanah
Tanaman Produktif
Sub Total Tenaga Kerja (6)
7 KONSUMSI :
Konsumsi
(The, Kopi, Gula, Kue dll)
Sub Total Tenaga Kerja (7)
Jumlah Total Biaya Upah Swadaya & PNPM/BLM (Rp)
Jumlah Total Biaya Konstruksi Swadaya & PNPM/BLM (1+2+3+4)
Jumlah Total Biaya Swadaya & BDI

Diverifikasi Oleh : Diverifikasi Oleh :


Faskel Teknik, UPL,

( ....................................) ( ....................................)
DAN BDI KOTAKU

: ________________________
Jenis Kegiatan : ________________________
: ________________________
: ________________________

Jumlah Biaya (Rp)


Harga
Satuan Dari Dari
Swadaya BDI KOTAKU
(7) (8)=(5)*(7) (9)=(6)*(7)

-
-
101,000 - 6,060,000
86,000 - 19,350,000
Sub Total Tenaga Kerja (1) 25,410,000

92,500 - 6,290,000
237,500 - 8,550,000
225,000 - 8,100,000
75,000 - 1,200,000
187,500 - 7,500,000
65,000 - 45,045,000
325,000 - 19,500,000
50 - 850,000
15,000 - 90,000
52,000 - 104,000
2,235,000 - 2,235,000
Sub Total Tenaga Kerja (2) 99,464,000

300000 - 6,000,000
Sub Total Tenaga Kerja (3) 6,000,000

100,000 - 100,000
60,000 - 60,000
53,000 - 53,000
100,000 - 100,000
30,000 - 30,000
50,000 - 50,000
7,000 - 7,000
350,000 - 350,000
Sub Total Tenaga Kerja (4) 750,000

-
Sub Total Tenaga Kerja (5)
-
-
Sub Total Tenaga Kerja (6)

-
-
Sub Total Tenaga Kerja (7)
adaya & PNPM/BLM (Rp) -
& PNPM/BLM (1+2+3+4) 131,624,000
aya Swadaya & BDI

Diverifikasi Oleh :
Ketua KSM,

( ....................................)
RENCANA PENGGUNAAN
KELURAHAN LAEL
TAHUN 2018

RPD Uraian
1 Pemb. Jalan Beton Lr. 9
2 Pemb. Drainase Lr. 11
3 Pemb. Jalan Beton Lr. 12
total
RENCANA PENGGUNAAN DANA BDI
KELURAHAN LAELO
TAHUN 2018

Vol Sat Harga Satuan Total Harga


138.9 M' 947,616.99 131,624,000
153 M' 489,385.62 74,876,000
156 M' 599,358.97 93,500,000
total 300,000,000
DAFTAR HARGA SATUAN UPAH

PROVINSI : SULAWESI SELATAN


KABUPATEN : WAJO
TAHUN ANGGARAN : 2017

NO. URAIAN KODE HARGA HARGA SATUAN


SATUAN (Rp/Hari)
(Rp/Jam)

1 Pekerja L.01 12,286 86,000

2 Tukang L.02. 14,429 101,000


3 Mandor L.03 14,500 101,500
4 Kepala Tukang L.10 15,200 106,400
5 Tukang Batu L.02.1 14,500 101,500

6 Tukang Cat L.02.2 14,500 101,500

7 Tukang Kayu L.02.3 14,500 101,500


8 Tukang Besi L.02.4 14,500 101,500
DAFTAR HARGA SATUAN BAHAN

PROVINSI : SULAWESI SELATAN


KABUPATEN : WAJO
TAHUN ANGGARAN : 2018
BIDANG : CIPTA KARYA

NO BAHAN / MATERIAL SAT HARGA BAHAN 2018

1 Batu Gunung M3 Rp 162,500


2 Tanah Timbunan M3 Rp 92,500
3 Pasir Urug M3 Rp 162,500
4 Pasir Pasangan M3 Rp 75,000
5 Pasir Beton M3 Rp 112,500
6 Sirtu M3 Rp 225,000
7 Batu Pecah/ Split 2-3 cm M3 Rp 250,000
8 Kayu Untuk Perancah (Kapok, Kemiri, Piawing M3 Rp 2,235,000
9 Minyak Pelumas Ltr Rp 52,000
10 Semen PC 50 Kg kg Rp 1,200
11 Paku Biasa 5-10 Cm Kg Rp 15,000
12 Air Kerja Ltr Rp 50
13 Plastik Cor M2 Rp 1,100
KET

237,500.000

150,000.000
187,500.000

325,000.000

1,300.000
JADWAL PELA
Kabupaten : ________________________
Kecamatan : ________________________
Kelurahan/Desa : ________________________
Nama KSM : ________________________

No Uraian Pekerjaan Total Harga Bobot

1 Persiapan/Administrasi 750,000.00 0.63


2 Galian Tanah 537,543.00 0.45
3 Urugan Tanah 7,619,359.50 6.36
4 Urugan Sirtu 9,312,550.50 7.77
5 Pasangan Batu 20,706,135.53 17.27
6 Lantai Kerja 17,974,407.23 14.99
7 Jalan Beton 54,104,501.78 45.13
8 Plesteran 5,108,048.96 4.26
9 Bekisting 3,776,447.93 3.15
total 119,888,994.42 100.00

Diverifikasi Oleh :
Faskel Teknik,

( ....................................)

0
0
JADWAL PELAKSANAAN PEKERJAAN
__________ No. R A B : ________________________
__________ Jenis Kegiatan : ________________________
__________ Volume : ________________________
__________ Lokasi : ________________________

Periode
Bulan I Bulan II Bulan III Ket
1 2 3 4 5 6 7 8 9 10 11 12

0.31 0.31
0.45
6.36
3.88 3.88
5.76 5.76 5.76
7.50 7.50
11.28 11.28 11.28 11.28
2.13 2.13
0.79 0.79 0.79 0.79

0.31 0.45 5.76 5.76 16.00 11.38 19.57 12.07 12.07 12.07 2.13 2.44
0.31 0.76 6.52 12.28 28.27 39.65 59.22 71.29 83.36 95.43 97.56 100.00

Diverifikasi Oleh : Diverifikasi Oleh :


UPL, Ketua KSM,

( ....................................) ( ....................................)

1 2 3 4 5 6 7 8 9 10 11 12
0.31 0.76 6.52 12.28 28.27 39.65 59.22 71.29 83.36 95.43 97.56 100.00
60 30 10
Persiapan/Administrasi 0.63 0.31 0.00 0.31
Galian Tanah 0.45 0.45 0.00 0.00
Urugan Tanah 6.36 6.36 0.00 0.00
Urugan Sirtu 7.77 7.77 0.00 0.00
Pasangan Batu 17.27 17.27 0.00 0.00
Lantai Kerja 14.99 14.99 0.00 0.00
Jalan Beton 45.13 11.28 33.85 0.00
Plesteran 4.26 0.00 0.00 4.26
Bekisting 3.15 0.79 2.36 0.00