FINAL ACCOUNT

PROYEK : RENOVASI PELEBARAN IDOLMART CILEGGON


PEMILIK : PT. Idola Cahaya Semesta (Idolmart)
LOKASI : Jl. Pondok Cileggon Indah Kec. Cibeber Cileggon

HARGA SATUAN
No URAIAN PEKERJAAN SAT QTY KONTRAK (Rp)

I. PEKERJAAN PERSIAPAN
1.1 Mob/demob tenaga kerja Ls 1.00 1,000,000.00
1.2 Pagar proyek Sementara Ls 1.00 1,500,000.00
JUMLAH I
II. PEKERJAAN LANTAI-1
A. PEKERJAAN BONGKARAN
2.1 Bongkar sekat tembok M2 120.00 30,000.00
2.2 Bongkar kamar mandi M2 12.00 25,000.00
2.3 Bongkar Plafond eksisting M2 124.02 24,000.00
2.4 Bongkar pantry meja dapur M2 9.60 20,000.00
JUMLAH II
B. PEKERJAAN LANTAI DAN DINDING
3.1 Pasang keramik lantai dalam uk. 40x40 Merk Mulia M2 130.22 130,000.00
3.2 Pasang keramik lantai teras uk. 40x40 Merk Mulia M2 12.84 130,000.00
3.3 Perapihan dinding bekas bobokan M2 12.00 25,000.00
3.4 Cat finishing dinding ex. Dulux Catylac White (area dalam) M2 102.00 34,000.00
3.5 Cat finishing dinding ex. Dulux Morrocansand (area Luar) M2 42.40 43,000.00
3.6 Partisi tripleks T=9mm, rangka kaso M2 13.20 110,000.00
3.7 Pengecatan partisi tripleks M2 13.20 40,000.00
3.8 Pasang Pintu tripleks rangka kaso lengkap dengan aksesories Unit 1.00 700,000.00
JUMLAH III
C. PEKERJAAN PLAFON
HARGA SATUAN
No URAIAN PEKERJAAN SAT QTY KONTRAK (Rp)

4.1 Pasang plafond gypsum T=9mm merk Jayaboard, M2 130.22 115,000.00


rangka hollow 40x40,20x40 mm
4.2 Pengecatan plafond Merk Vinilex M2 130.22 34,000.00
JUMLAH IV

D. PEKERJAAN BAGIAN LUAR (TERAS TOKO)


5.1 Pengecatan cat minyak rangka kanopi Ftalit M2 27.82 54,000.00
5.2 Penggantian Atap canopy existing dengan zincalumn T=0.35 mm M2 27.82 90,000.00
5.3 Pasang Flashing atap Canopy M1 10.70 60,000.00

JUMLAH V
III. PEKERJAAN LANTAI 2
A. PEKERJAAN DINDING
6.1 Perapihan dinding M2 30.80 50,000.00
6.2 Cat finishing dinding ex. Dulux Catylac White (area dalam) M2 30.80 34,000.00
JUMLAH VI
HARGA SATUAN
No URAIAN PEKERJAAN SAT QTY KONTRAK (Rp)

B. PEMASANGAN PLAFON
7.1 Pasang plafond gypsum T=9mm merk Jayaboard, M2 32.70 115,000.00
rangka hollow 40x40,20x40 mm
7.2 Pengecatan plafond Merk Vinilex M2 32.70 34,000.00
JUMLAH VII
C. PEKERJAAN SANITAIR DAN PANTRY
8.1 Bongkar pasang dari Closet Duduk Jadi Closet Jongkok Merk TOTO Bh 1.00 700,000.00
8.2 Pintu Spandrel (Alm, Alexindo) Unit 1.00 1,700,000.00
8.3 Kran air (onda) Buah 1.00 55,000.00
8.4 Pasang water tank kpasitas 500 L bh 1.00 1,355,000.00
8.5 Pemasangan Floor drain merk onda bh 1.00 190,000.00
8.6 Meja beton dapur Finish Keramik M2 4.00 650,000.00
8.7 Keran leher angsa bh 1.00 150,000.00
8.8 Sink standar bh 1.00 350,000.00
8.9 Intstallasi Pipa air bersih, Wavin AW Ø 1,5 Inch M1 15.00 40,000.00
JUMLAH VIII
D. PEKERJAAN ATAP
4.1 Penggantian Atap Asbes dengan zincalumn T=0.35 mm M2 20.00 105,000.00
4.2 Pemasangan Roof drain bh 4.00 80,000.00
4.3 Flashing atap m1 10.00 65,000.00
4.4 Talang atap zincalumn M1 10.00 100,000.00
JUMLAH IX
E. PEKERJAAN WATER PROOFING
10.1 Water proofing talang+ Serat Fiber (merk Aquaproof) M2 16.94 119,000.00
JUMLAH X
HARGA SATUAN
No URAIAN PEKERJAAN SAT QTY KONTRAK (Rp)

F. PEKERJAAN PARTISI KACA DAN PINTU


11.1 Pasang partisi kaca, rangka aluminium ex. Alexindo warna silver, Ls 1.00 9,500,000.00
kaca tebal 5mm.
11.2 Pasang Pintu kaca T=5mm rangka aluminium ex. Alexindo, Floor Hinge Unit 1.00 4,000,000.00
Merk Dorma BTS-75
11.3 Pemasangan Pintu Folding Gate 0,4mm Tinggi 2,8m m2 29.7 265,000.00

JUMLAH XI
G. LAIN-LAIN
12.1 Koordinasi keamanan lingkungan (Ormas, LSM dan Preman) Ls 1.00 1,000,000.00
12.2 Buang puing dan pembersihan lokasi Ls 1.00 2,000,000.00
12.3 Instalasi Rak Ls 1.00 1,500,000.00
JUMLAH XII
HARGA SATUAN
No URAIAN PEKERJAAN SAT QTY KONTRAK (Rp)

H. PEKERJAAN TAMBAHAN
1 Dinding Bata Plester Aci Dengan Tiang diCor untuk dudukan folding Gate M2 2.42 650,000.00
2 Pengecatan dinding Folding Gate Cat finishing ex. Dulux Morrocansand (area Luar) M2 5.27 43,000.00
3 Perbaikan Atap yang bocor dengan Bahan No Drop M' 12.00 85,000.00
4 Ganti Genteng Beton Uk. 30 x 35 cm Bh 5.00 25,000.00
5 Ganti Kaso yang Kropos Bh 4.00 75,000.00
6 Tambahan Penopang Kaso Dengan Kayu Balok Timur M' 6.00 250,000.00
7 Tambahan Penopang Kaso Dengan Kayu Balok Barat M' 4.00 250,000.00

8 Tiang yang dibobok area dalam diperbaiki dan Modifikasi karena indikasi ambruk ukuran L0,4 x 3 Meter (4 Buah Bh 4.00 750,000.00
Tiang) Area Dalam (Cor Tiang + Pas.Bata + Plester Aci + Pengecatan Tiang)

9 Pekerjaan Pemasangan GRC + Rangka tutup atas folding gate Ls 1.00 1,500,000.00
10 Pekerjaan Pengecatan GRC atas Folding Gate Cat finishing ex. Dulux Morrocansand (area Luar) Ls 1.00 258,000.00
11 Cat Dinding Dalam dengan Cat Minyak Bekas Dapur (Menghilangkan Flek Dinding) Ls 1.00 1,000,000.00
12 Bongkar Keramik Existing Lantai 1 M2 65.11 35,000.00
13 Pasang Keramik WC Toilet Lantai 2 M2 2.00 85,000.00
14 Perbaikan Dinding Cat Yang Rontok Karena acian exisiting tidak Baik Ls 1.00 300,000.00
15 Perbaikan Asbes Yang Bocor Area Gudang Ls 1.00 300,000.00

JUMLAH XIII
NILAI KONTRAK

NOTE PENAGIHAN TERMIJN :


1). Termijn 1 Dp 30% Sblm Addendu
2). Tagihan Progress 85%

3). Tagihan Final 100%


HARGA SATUAN
No URAIAN PEKERJAAN SAT QTY KONTRAK (Rp)

Total Tagihan Di
4). Retensi 2 Bulan 5% (Tagihan Final
Total Tagihan Final yang diterima Dik
TOTAL ADDITIONAL
TOTAL KONTRAK QTY TOTAL ACTUAL (Rp) TOTAL TAKEOUT (Rp)
(Rp)
KET
(A) ACTUAL ADDITIONAL TAKEOUT (B) (C)

1,000,000.00 1.00 Rp 1,000,000.00 Rp - completed


1,500,000.00 1.00 Rp 1,500,000.00 Rp - completed
2,500,000.00 2,500,000.00 - -

3,600,000.00 120.00 Rp 3,600,000.00 Rp - completed


300,000.00 12.00 Rp 300,000.00 Rp - completed
2,976,480.00 124.02 Rp 2,976,480.00 Rp - completed
192,000.00 9.60 Rp 192,000.00 Rp - completed
7,068,480.00 7,068,480.00 - -

16,928,730.00 130.22 - 65.11 Rp 16,928,730.00 Rp (8,464,365.00) completed


1,669,200.00 12.84 Rp 1,669,200.00 Rp - completed
300,000.00 12.00 Rp 300,000.00 Rp - completed
3,468,000.00 102.00 Rp 3,468,000.00 Rp - completed
1,823,200.00 42.40 Rp 1,823,200.00 Rp - completed
1,452,000.00 13.20 Rp 1,452,000.00 Rp - completed
528,000.00 13.20 Rp 528,000.00 Rp - completed
700,000.00 1.00 Rp 700,000.00 Rp - completed
26,869,130.00 26,869,130.00 Rp (8,464,365.00)
TOTAL ADDITIONAL
TOTAL KONTRAK QTY TOTAL ACTUAL (Rp) TOTAL TAKEOUT (Rp)
(Rp)
KET
(A) ACTUAL ADDITIONAL TAKEOUT (B) (C)

14,975,415.00 130.22 Rp 14,975,415.00 Rp - completed


Rp -
4,427,514.00 130.22 Rp 4,427,514.00 Rp - completed
19,402,929.00 Rp 19,402,929.00 Rp -

1,502,280.00 27.82 Rp 1,502,280.00 Rp - completed


2,503,800.00 27.82 Rp 2,503,800.00 Rp - completed
642,000.00 10.70 Rp 642,000.00 Rp - completed

4,648,080.00 4,648,080.00 Rp -

1,540,000.00 30.80 Rp 1,540,000.00 Rp - completed


1,047,200.00 30.80 Rp 1,047,200.00 Rp - completed
2,587,200.00 2,587,200.00 Rp -
TOTAL ADDITIONAL
TOTAL KONTRAK QTY TOTAL ACTUAL (Rp) TOTAL TAKEOUT (Rp)
(Rp)
KET
(A) ACTUAL ADDITIONAL TAKEOUT (B) (C)

3,760,500.00 32.70 Rp 3,760,500.00 Rp - completed


Rp -
1,111,800.00 32.70 Rp 1,111,800.00 Rp - completed
4,872,300.00 4,872,300.00 Rp -

700,000.00 1.00 Rp 700,000.00 Rp - completed


1,700,000.00 1.00 Rp 1,700,000.00 Rp - completed
55,000.00 1.00 Rp 55,000.00 Rp - completed
1,355,000.00 1.00 Rp 1,355,000.00 Rp - completed
190,000.00 1.00 Rp 190,000.00 Rp - completed
2,600,000.00 4.00 Rp 2,600,000.00 Rp - completed
150,000.00 1.00 Rp 150,000.00 Rp - completed
350,000.00 1.00 Rp 350,000.00 Rp - completed
600,000.00 15.00 Rp 600,000.00 Rp - completed
7,700,000.00 7,700,000.00 Rp -

2,100,000.00 20.00 Rp 2,100,000.00 Rp - completed


320,000.00 4.00 Rp 320,000.00 Rp - completed
650,000.00 10.00 Rp 650,000.00 Rp - completed
1,000,000.00 10.00 Rp 1,000,000.00 Rp - completed
4,070,000.00 4,070,000.00 Rp -

2,015,860.00 16.94 Rp 2,015,860.00 Rp - completed


2,015,860.00 2,015,860.00 Rp -
TOTAL ADDITIONAL
TOTAL KONTRAK QTY TOTAL ACTUAL (Rp) TOTAL TAKEOUT (Rp)
(Rp)
KET
(A) ACTUAL ADDITIONAL TAKEOUT (B) (C)

9,500,000.00 (1.00) Rp - Rp - Rp (9,500,000.00) Take out by Owner

4,000,000.00 (1.00) Rp - Rp - Rp (4,000,000.00) Take out by Owner

7,865,200.00 (29.68) Rp - Rp - Rp (7,865,200.00) Take out by Owner

21,365,200.00 - - Rp (21,365,200.0000)

1,000,000.00 1.00 Rp 1,000,000.00 Rp - completed


2,000,000.00 1.00 Rp 2,000,000.00 Rp - completed
1,500,000.00 0.00 Rp - Rp - completed
4,500,000.00 3,000,000.00 Rp - Rp -
TOTAL ADDITIONAL
TOTAL KONTRAK QTY TOTAL ACTUAL (Rp) TOTAL TAKEOUT (Rp)
(Rp)
KET
(A) ACTUAL ADDITIONAL TAKEOUT (B) (C)

2.42 Rp - 1,574,625.00 Rp - New Item SI


5.27 Rp - 226,717.50 Rp - New Item SI
12.00 Rp - 1,020,000.00 Rp - New Item SI
5.00 Rp - 125,000.00 Rp - New Item SI
4.00 Rp - 300,000.00 Rp - New Item SI
6.00 Rp - 1,500,000.00 Rp - New Item SI
4.00 Rp - 1,000,000.00 Rp - New Item SI

4.00 Rp - 3,000,000.00 Rp - New Item SI

1.00 Rp - 1,500,000.00 Rp - New Item SI


1.00 Rp - 258,000.00 Rp - New Item SI
1.00 Rp - 1,000,000.00 Rp - New Item SI
65.11 Rp - 2,278,867.50 Rp - New Item SI
2.00 Rp - 170,000.00 Rp - New Item SI
1.00 Rp - 300,000.00 Rp - New Item SI
1.00 Rp - 300,000.00 Rp - New Item SI

- Rp 14,553,210.00 Rp -
Rp 107,599,179.0 Rp 84,733,979.00 Rp 14,553,210.00 Rp (29,829,565.00)

(A+B+C)= Rp 92,322,824.00
HAN TERMIJN :
p 30% Sblm Addendum -Rp 32,250,000.00 (Sudah ditransfer)
-Rp 39,745,000.00 (Sudah ditransfer)
Yang Sudah Ditransfer sampai saat ini -Rp 71,995,000.00 (total)
Rp 92,322,824.00
TOTAL ADDITIONAL
TOTAL KONTRAK QTY TOTAL ACTUAL (Rp) TOTAL TAKEOUT (Rp)
(Rp)
KET
(A) ACTUAL ADDITIONAL TAKEOUT (B) (C)
Total Tagihan Dikurangi yang sudah ditransfer Rp 20,327,824.00
ulan 5% (Tagihan Final 100% x 5%) -Rp 4,616,141.20
Final yang diterima Dikurangi Retensi 5% sejumlah : Rp 15,711,682.80 Dibulatkan -----> Rp 15,711,600 Final Tagihan 95% Retensi 5%
Head Office :

Bulak Kapal Permai Blok EE. No.19


Bulak Kapal-Bekasi
Workshop :
A. Jl. Irigasi Citarum No.44 Kondang Jaya-Karawang
B. Bekasi Tambun Jawa Barat

QUOTATION NUMBER : '07/PS/ABS/11/18

TO : PT. Idola Cahaya Semesta ADDRESS CORRES


Jl. Jatibening No. 60A, Pondok Gede Bekasi
Kota Bekasi, Jawa Barat
Up : Bapak/ Ibu Ditempat

BQ HARGA PENAWARAN
PROYEK : RENOVASI PELEBARAN IDOLMART CILEGGON
PEMILIK : PT. Idola Cahaya Semesta (Idolmart)
LOKASI : Jl. Pondok Cileggon Indah Kec. Cibeber Cileggon
No URAIAN PEKERJAAN SAT

I. PEKERJAAN PERSIAPAN
1.1 Mob/demob tenaga kerja Ls
1.2 Pagar proyek Sementara Ls

II. PEKERJAAN LANTAI-1


A. PEKERJAAN BONGKARAN
2.1 Bongkar sekat tembok M2
2.2 Bongkar kamar mandi M2
2.3 Bongkar Plafond eksisting M2
2.4 Bongkar pantry meja dapur M2

B. PEKERJAAN LANTAI DAN DINDING


3.1 Pasang keramik lantai dalam uk. 40x40 Merk Mulia M2
3.2 Pasang keramik lantai teras uk. 40x40 Merk Mulia M2
3.3 Perapihan dinding bekas bobokan M2
3.4 Cat finishing dinding ex. Dulux Catylac White (area dalam) M2
3.5 Cat finishing dinding ex. Dulux Morrocansand (area Luar) M2
3.6 Partisi tripleks T=9mm, rangka kaso M2
3.7 Pengecatan partisi tripleks M2
3.8 Pasang Pintu tripleks rangka kaso lengkap dengan aksesories Unit

C. PEKERJAAN PLAFON
4.1 Pasang plafond gypsum T=9mm merk Jayaboard, M2
rangka hollow 40x40,20x40 mm
4.2 Pengecatan plafond Merk Vinilex M2

D. PEKERJAAN BAGIAN LUAR (TERAS TOKO)


5.1 Pengecatan cat minyak rangka kanopi Ftalit M2
5.2 Penggantian Atap canopy existing dengan zincalumn T=0.35 mm M2
5.3 Pasang Flashing atap Canopy M1

III. PEKERJAAN LANTAI 2


A. PEKERJAAN DINDING
6.1 Perapihan dinding M2
6.2 Cat finishing dinding ex. Dulux Catylac White (area dalam) M2

B. PEMASANGAN PLAFON
7.1 Pasang plafond gypsum T=9mm merk Jayaboard, M2
rangka hollow 40x40,20x40 mm
7.2 Pengecatan plafond Merk Vinilex M2

C. PEKERJAAN SANITAIR DAN PANTRY


8.1 Bongkar pasang dari Closet Duduk Jadi Closet Jongkok Merk TOTO Bh
8.2 Pintu Spandrel (Alm, Alexindo) Unit
8.3 Kran air (onda) Buah
8.4 Pasang water tank kpasitas 500 L bh
8.5 Pemasangan Floor drain merk onda bh
8.6 Meja beton dapur Finish Keramik M2
8.7 Keran leher angsa bh
8.8 Sink standar bh
8.9 Intstallasi Pipa air bersih, Wavin AW Ø 1,5 Inch M1

D. PEKERJAAN ATAP
4.1 Penggantian Atap Asbes dengan zincalumn T=0.35 mm M2
4.2 Pemasangan Roof drain bh
4.3 Flashing atap m1
4.4 Talang atap zincalumn M1

E. PEKERJAAN WATER PROOFING


10.1 Water proofing talang+ Serat Fiber (merk Aquaproof) M2

F. PEKERJAAN PARTISI KACA DAN PINTU


11.1 Pasang partisi kaca, rangka aluminium ex. Alexindo warna silver, Ls
kaca tebal 5mm.
11.2 Pasang Pintu kaca T=5mm rangka aluminium ex. Alexindo, Floor Hinge Unit
Merk Dorma BTS-75
11.3 Pemasangan Pintu Folding Gate 0,4mm Tinggi 2,8m m2

G. LAIN-LAIN
12.1 Koordinasi keamanan lingkungan (Ormas, LSM dan Preman) Ls
12.2 Buang puing dan pembersihan lokasi Ls
12.3 Instalasi Rak Ls

Terbilang :
SERATUS TUJUH JUTA LIMA RATUS RIBU RUPIAH

Karawang, 29 November 2018

Alfirman Akhirudin
Atas Nama Direktur
QUOTATION

QT. DATE November 28, 2018


TERMS RENOVASI PELEBARAN IDOLMART CILEGGON
SHIP VIA ANDALAN Tekhnik

ADDRESS CORRESPONDENCE TO:


Name Abdul Kodir SE./Alfirman. ST (PM)
E-mail vrmancivilengineering@gmail.com
absconsulting31@gmai.com
Phone 081381903427/ 082113382503
TELP # 0267-8409629
ARGA PENAWARAN

Jumlah Harga Satuan TOTAL

Rp 1,000,000 Rp 1,000,000.00
Rp 1,500,000 Rp 1,500,000.00
JUMLAH I Rp 2,500,000.00

Rp 30,000 Rp 3,600,000.00
Rp 25,000 Rp 300,000.00
Rp 24,000 Rp 2,976,480.00
Rp 20,000 Rp 192,000.00
JUMLAH II Rp 7,068,480.00

Rp 130,000 Rp 16,928,730.00
Rp 130,000 Rp 1,669,200.00
Rp 25,000 Rp 300,000.00
Rp 34,000 Rp 3,468,000.00
Rp 43,000 Rp 1,823,200.00
Rp 110,000 Rp 1,452,000.00
Rp 40,000 Rp 528,000.00
Rp 700,000 Rp 700,000.00
JUMLAH III Rp 26,869,130.00
Rp 115,000 Rp 14,975,415.00

Rp 34,000 Rp 4,427,514.00
JUMLAH IV Rp 19,402,929.00

Rp 54,000 Rp 1,502,280.00
Rp 90,000 Rp 2,503,800.00
Rp 60,000 Rp 642,000.00

JUMLAH V Rp 4,648,080.00

Rp 50,000 Rp 1,540,000.00
Rp 34,000 Rp 1,047,200.00
JUMLAH VI Rp 2,587,200.00

Rp 115,000 Rp 3,760,500.00

Rp 34,000 Rp 1,111,800.00
JUMLAH VII Rp 4,872,300.00

Rp 700,000 Rp 700,000.00
Rp 1,700,000 Rp 1,700,000.00
Rp 55,000 Rp 55,000.00
Rp 1,355,000 Rp 1,355,000.00
Rp 190,000 Rp 190,000.00
Rp 650,000 Rp 2,600,000.00
Rp 150,000 Rp 150,000.00
Rp 350,000 Rp 350,000.00
Rp 40,000 Rp 600,000.00
JUMLAH VIII Rp 7,700,000.00

Rp 105,000 Rp 2,100,000.00
Rp 80,000 Rp 320,000.00
Rp 65,000 Rp 650,000.00
Rp 100,000 Rp 1,000,000.00
JUMLAH IX Rp 4,070,000.00

Rp 119,000 Rp 2,015,860.00
JUMLAH X Rp 2,015,860

Rp 9,500,000 Rp 9,500,000.00

Rp 4,000,000 Rp 4,000,000.00

Rp 265,000 Rp 7,865,200.00

JUMLAH XI Rp 21,365,200.00
Rp 1,000,000 Rp 1,000,000.00
Rp 2,000,000 Rp 2,000,000.00
Rp 1,500,000 Rp 1,500,000.00
JUMLAH XI Rp 4,500,000.00
JUMLAH TOTAL Rp 107,599,179.00
DIBULATKAN Rp 107,500,000.00

1. Harga Netto Price


2. DP Uang Muka 30%
3. DP Dikirimkan Ke No Rek. 173.000.126.00.34
Atas Nama Alfirman Akhiruddin ( Cabang Bank Mandiri)
(Penanggung Jawab Perusahaan)
TIME SCHEDULE PROJECT RENOVASI RUKO IDOLMART CILEGGON
PROYEK : RENOVASI PELEBARAN IDOLMART CILEGGON
PEMILIK : PT. IDOLA CAHAYA SEMESTA (IDOLMART)
LOKASI : Jl. Pondok Cileggon Indah Kec. Cibeber Cileggon

No URAIAN PEKERJAAN
Bobot (%) Dec-18
Tgl 3 Tgl 4 Tgl 5 Tgl 6 Tgl 7 Tgl 8 Tgl 9 Tgl 10 Tgl 11 Tgl 12 Tgl 13
I. PEKERJAAN PERSIAPAN
1.1 Mob/demob 0.93 0.46
1.2 Pembersihan lokasi 1.39 0.70
II. PEKERJAAN LANTAI-1
A. PEKERJAAN BONGKARAN 6.57 1.31 1.31 1.31 1.31 1.31 76.22
B. PEKERJAAN LANTAI DAN DINDING 24.97 3.57 3.57 3.57 3.57 3.57 3.57 3.57 68.64
C. PEKERJAAN PLAFON 18.03 2.58 2.58 2.58 64.36
2.58 2.58
D. PEKERJAAN BAGIAN LUAR (TERAS TOKO) 4.32 0.86 0.86 0.86 0.86 0.86 56.17
III. PEKERJAAN LANTAI 2
47.98
A. PEKERJAAN DINDING 2.40 0.34 0.34 0.34 0.34 0.34 0.34 0.34
B. PEMASANGAN PLAFON 4.53 0.65
38.93 0.65 0.65 0.65 0.65
C. PEKERJAAN SANITAIR DAN PANTRY 7.16 1.79 1.79 1.79 1.79
28.90
D. PEKERJAAN ATAP 3.78 0.54 0.54 0.54 0.54
E. PEKERJAAN WATER PROOFING 1.87 22.09 0.27 0.27 0.27 0.27
F. PEKERJAAN PARTISI KACA DAN PINTU 19.86 13.97
G. LAIN-LAIN 4.18 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25
4.28 5.84
TOTAL HARGA 100.00 2.72
BOBOT PROGRESS PER HARI 2.72 1.56 1.56 8.12 8.12 6.81 10.03 9.05 8.19 8.19 4.28
KUMULATIF BOBOT PER HARI 2.72 4.28 5.84 13.97 22.09 28.90 38.93 47.98 56.17 64.36 68.64
DEVIASI
Tgl 14 Tgl 15 Tgl 16 Tgl 17 Tgl 18 Tgl 19 Tgl 20 Tgl 21
98.84 100.00
95.28 95.28
91.73 0.46
88.17 0.70
83.81
76.22
4
2.58 2.58

0.65 0.65

0.54 0.54 0.54


0.27 0.27 0.27
3.31 3.31 3.31 3.31 3.31 3.31
0.25 0.25 0.25 0.25 0.25 0.25

7.59 7.59 4.36 3.56 3.56 - 3.56 1.16


76.22 83.81 88.17 91.73 95.28 95.28 98.84 100.00
FINAL ACCOUNT
PROYEK : RENOVASI PELEBARAN IDOLMART CILEGGON
PEMILIK : PT. Idola Cahaya Semesta (Idolmart)
LOKASI : Jl. Pondok Cileggon Indah Kec. Cibeber Cileggon

HARGA SATUAN
No URAIAN PEKERJAAN SAT QTY KONTRAK (Rp)

I. PEKERJAAN PERSIAPAN
1.1 Mob/demob tenaga kerja Ls 1.00 1,000,000.00
1.2 Pagar proyek Sementara Ls 1.00 1,500,000.00
JUMLAH I
II. PEKERJAAN LANTAI-1
A. PEKERJAAN BONGKARAN
2.1 Bongkar sekat tembok M2 120.00 30,000.00
2.2 Bongkar kamar mandi M2 12.00 25,000.00
2.3 Bongkar Plafond eksisting M2 124.02 24,000.00
2.4 Bongkar pantry meja dapur M2 9.60 20,000.00
JUMLAH II
B. PEKERJAAN LANTAI DAN DINDING
3.1 Pasang keramik lantai dalam uk. 40x40 Merk Mulia M2 130.22 130,000.00
3.2 Pasang keramik lantai teras uk. 40x40 Merk Mulia M2 12.84 130,000.00
3.3 Perapihan dinding bekas bobokan M2 12.00 25,000.00
3.4 Cat finishing dinding ex. Dulux Catylac White (area dalam) M2 102.00 34,000.00
3.5 Cat finishing dinding ex. Dulux Morrocansand (area Luar) M2 42.40 43,000.00
3.6 Partisi tripleks T=9mm, rangka kaso M2 13.20 110,000.00
3.7 Pengecatan partisi tripleks M2 13.20 40,000.00
3.8 Pasang Pintu tripleks rangka kaso lengkap dengan aksesories Unit 1.00 700,000.00
JUMLAH III
C. PEKERJAAN PLAFON
HARGA SATUAN
No URAIAN PEKERJAAN SAT QTY KONTRAK (Rp)

4.1 Pasang plafond gypsum T=9mm merk Jayaboard, M2 130.22 115,000.00


rangka hollow 40x40,20x40 mm
4.2 Pengecatan plafond Merk Vinilex M2 130.22 34,000.00
JUMLAH IV

D. PEKERJAAN BAGIAN LUAR (TERAS TOKO)


5.1 Pengecatan cat minyak rangka kanopi Ftalit M2 27.82 54,000.00
5.2 Penggantian Atap canopy existing dengan zincalumn T=0.35 mm M2 27.82 90,000.00
5.3 Pasang Flashing atap Canopy M1 10.70 60,000.00

JUMLAH V
III. PEKERJAAN LANTAI 2
A. PEKERJAAN DINDING
6.1 Perapihan dinding M2 30.80 50,000.00
6.2 Cat finishing dinding ex. Dulux Catylac White (area dalam) M2 30.80 34,000.00
JUMLAH VI
HARGA SATUAN
No URAIAN PEKERJAAN SAT QTY KONTRAK (Rp)

B. PEMASANGAN PLAFON
7.1 Pasang plafond gypsum T=9mm merk Jayaboard, M2 32.70 115,000.00
rangka hollow 40x40,20x40 mm
7.2 Pengecatan plafond Merk Vinilex M2 32.70 34,000.00
JUMLAH VII
C. PEKERJAAN SANITAIR DAN PANTRY
8.1 Bongkar pasang dari Closet Duduk Jadi Closet Jongkok Merk TOTO Bh 1.00 700,000.00
8.2 Pintu Spandrel (Alm, Alexindo) Unit 1.00 1,700,000.00
8.3 Kran air (onda) Buah 1.00 55,000.00
8.4 Pasang water tank kpasitas 500 L bh 1.00 1,355,000.00
8.5 Pemasangan Floor drain merk onda bh 1.00 190,000.00
8.6 Meja beton dapur Finish Keramik M2 4.00 650,000.00
8.7 Keran leher angsa bh 1.00 150,000.00
8.8 Sink standar bh 1.00 350,000.00
8.9 Intstallasi Pipa air bersih, Wavin AW Ø 1,5 Inch M1 15.00 40,000.00
JUMLAH VIII
D. PEKERJAAN ATAP
4.1 Penggantian Atap Asbes dengan zincalumn T=0.35 mm M2 20.00 105,000.00
4.2 Pemasangan Roof drain bh 4.00 80,000.00
4.3 Flashing atap m1 10.00 65,000.00
4.4 Talang atap zincalumn M1 10.00 100,000.00
JUMLAH IX
E. PEKERJAAN WATER PROOFING
10.1 Water proofing talang+ Serat Fiber (merk Aquaproof) M2 16.94 119,000.00
JUMLAH X
HARGA SATUAN
No URAIAN PEKERJAAN SAT QTY KONTRAK (Rp)

F. PEKERJAAN PARTISI KACA DAN PINTU


11.1 Pasang partisi kaca, rangka aluminium ex. Alexindo warna silver, Ls 1.00 9,500,000.00
kaca tebal 5mm.
11.2 Pasang Pintu kaca T=5mm rangka aluminium ex. Alexindo, Floor Hinge Unit 1.00 4,000,000.00
Merk Dorma BTS-75
11.3 Pemasangan Pintu Folding Gate 0,4mm Tinggi 2,8m m2 29.7 265,000.00

JUMLAH XI
G. LAIN-LAIN
12.1 Koordinasi keamanan lingkungan (Ormas, LSM dan Preman) Ls 1.00 1,000,000.00
12.2 Buang puing dan pembersihan lokasi Ls 1.00 2,000,000.00
12.3 Instalasi Rak Ls 1.00 1,500,000.00
JUMLAH XII
HARGA SATUAN
No URAIAN PEKERJAAN SAT QTY KONTRAK (Rp)

H. PEKERJAAN TAMBAHAN
1 Dinding Bata Plester Aci Dengan Tiang diCor untuk dudukan folding Gate M2 2.42 650,000.00
2 Pengecatan dinding Folding Gate Cat finishing ex. Dulux Morrocansand (area Luar) M2 5.27 43,000.00
3 Perbaikan Atap yang bocor dengan Bahan No Drop M' 12.00 85,000.00
4 Ganti Genteng Beton Uk. 30 x 35 cm Bh 5.00 25,000.00
5 Ganti Kaso yang Kropos Bh 4.00 75,000.00
6 Tambahan Penopang Kaso Dengan Kayu Balok Timur M' 6.00 250,000.00
7 Tambahan Penopang Kaso Dengan Kayu Balok Barat M' 4.00 250,000.00

8 Tiang yang dibobok area dalam diperbaiki dan Modifikasi karena indikasi ambruk ukuran L0,4 x 3 Meter (4 Buah Bh 4.00 750,000.00
Tiang) Area Dalam (Cor Tiang + Pas.Bata + Plester Aci + Pengecatan Tiang)

9 Pekerjaan Pemasangan GRC + Rangka tutup atas folding gate Ls 1.00 1,500,000.00
10 Pekerjaan Pengecatan GRC atas Folding Gate Cat finishing ex. Dulux Morrocansand (area Luar) Ls 1.00 258,000.00
11 Cat Dinding Dalam dengan Cat Minyak Bekas Dapur (Menghilangkan Flek Dinding) Ls 1.00 1,000,000.00
12 Bongkar Keramik Existing Lantai 1 M2 65.11 35,000.00
13 Pasang Keramik WC Toilet Lantai 2 M2 2.00 85,000.00
14 Perbaikan Dinding Cat Yang Rontok Karena acian exisiting tidak Baik Ls 1.00 300,000.00
15 Perbaikan Asbes Yang Bocor Area Gudang Ls 1.00 300,000.00

JUMLAH XIII
NILAI KONTRAK

NOTE PENAGIHAN TERMIJN :


1). Termijn 1 Dp 30% Sblm Addendu
2). Tagihan Progress 85%
3.) Retensi 5%
HARGA SATUAN
No URAIAN PEKERJAAN SAT QTY KONTRAK (Rp)

3). Tagihan Final 100%


Total Tagihan Di
Total Tagihan Fin
TOTAL ADDITIONAL
TOTAL KONTRAK QTY TOTAL ACTUAL (Rp) TOTAL TAKEOUT (Rp)
(Rp)
KET
(A) ACTUAL ADDITIONAL TAKEOUT (B) (C)

1,000,000.00 1.00 Rp 1,000,000.00 Rp - completed


1,500,000.00 1.00 Rp 1,500,000.00 Rp - completed
2,500,000.00 2,500,000.00 - -

3,600,000.00 120.00 Rp 3,600,000.00 Rp - completed


300,000.00 12.00 Rp 300,000.00 Rp - completed
2,976,480.00 124.02 Rp 2,976,480.00 Rp - completed
192,000.00 9.60 Rp 192,000.00 Rp - completed
7,068,480.00 7,068,480.00 - -

16,928,730.00 130.22 - 65.11 Rp 16,928,730.00 Rp (8,464,365.00) completed


1,669,200.00 12.84 Rp 1,669,200.00 Rp - completed
300,000.00 12.00 Rp 300,000.00 Rp - completed
3,468,000.00 102.00 Rp 3,468,000.00 Rp - completed
1,823,200.00 42.40 Rp 1,823,200.00 Rp - completed
1,452,000.00 13.20 Rp 1,452,000.00 Rp - completed
528,000.00 13.20 Rp 528,000.00 Rp - completed
700,000.00 1.00 Rp 700,000.00 Rp - completed
26,869,130.00 26,869,130.00 Rp (8,464,365.00)
TOTAL ADDITIONAL
TOTAL KONTRAK QTY TOTAL ACTUAL (Rp) TOTAL TAKEOUT (Rp)
(Rp)
KET
(A) ACTUAL ADDITIONAL TAKEOUT (B) (C)

14,975,415.00 130.22 Rp 14,975,415.00 Rp - completed


Rp -
4,427,514.00 130.22 Rp 4,427,514.00 Rp - completed
19,402,929.00 Rp 19,402,929.00 Rp -

1,502,280.00 27.82 Rp 1,502,280.00 Rp - completed


2,503,800.00 27.82 Rp 2,503,800.00 Rp - completed
642,000.00 10.70 Rp 642,000.00 Rp - completed

4,648,080.00 4,648,080.00 Rp -

1,540,000.00 30.80 Rp 1,540,000.00 Rp - completed


1,047,200.00 30.80 Rp 1,047,200.00 Rp - completed
2,587,200.00 2,587,200.00 Rp -
TOTAL ADDITIONAL
TOTAL KONTRAK QTY TOTAL ACTUAL (Rp) TOTAL TAKEOUT (Rp)
(Rp)
KET
(A) ACTUAL ADDITIONAL TAKEOUT (B) (C)

3,760,500.00 32.70 Rp 3,760,500.00 Rp - completed


Rp -
1,111,800.00 32.70 Rp 1,111,800.00 Rp - completed
4,872,300.00 4,872,300.00 Rp -

700,000.00 1.00 Rp 700,000.00 Rp - completed


1,700,000.00 1.00 Rp 1,700,000.00 Rp - completed
55,000.00 1.00 Rp 55,000.00 Rp - completed
1,355,000.00 1.00 Rp 1,355,000.00 Rp - completed
190,000.00 1.00 Rp 190,000.00 Rp - completed
2,600,000.00 4.00 Rp 2,600,000.00 Rp - completed
150,000.00 1.00 Rp 150,000.00 Rp - completed
350,000.00 1.00 Rp 350,000.00 Rp - completed
600,000.00 15.00 Rp 600,000.00 Rp - completed
7,700,000.00 7,700,000.00 Rp -

2,100,000.00 20.00 Rp 2,100,000.00 Rp - completed


320,000.00 4.00 Rp 320,000.00 Rp - completed
650,000.00 10.00 Rp 650,000.00 Rp - completed
1,000,000.00 10.00 Rp 1,000,000.00 Rp - completed
4,070,000.00 4,070,000.00 Rp -

2,015,860.00 16.94 Rp 2,015,860.00 Rp - completed


2,015,860.00 2,015,860.00 Rp -
TOTAL ADDITIONAL
TOTAL KONTRAK QTY TOTAL ACTUAL (Rp) TOTAL TAKEOUT (Rp)
(Rp)
KET
(A) ACTUAL ADDITIONAL TAKEOUT (B) (C)

9,500,000.00 (1.00) Rp - Rp - Rp (9,500,000.00) Take out by Owner

4,000,000.00 (1.00) Rp - Rp - Rp (4,000,000.00) Take out by Owner

7,865,200.00 (29.68) Rp - Rp - Rp (7,865,200.00) Take out by Owner

21,365,200.00 - - Rp (21,365,200.0000)

1,000,000.00 1.00 Rp 1,000,000.00 Rp - completed


2,000,000.00 1.00 Rp 2,000,000.00 Rp - completed
1,500,000.00 0.00 Rp - Rp - completed
4,500,000.00 3,000,000.00 Rp - Rp -
TOTAL ADDITIONAL
TOTAL KONTRAK QTY TOTAL ACTUAL (Rp) TOTAL TAKEOUT (Rp)
(Rp)
KET
(A) ACTUAL ADDITIONAL TAKEOUT (B) (C)

2.42 Rp - 1,574,625.00 Rp - New Item SI


5.27 Rp - 226,717.50 Rp - New Item SI
12.00 Rp - 1,020,000.00 Rp - New Item SI
5.00 Rp - 125,000.00 Rp - New Item SI
4.00 Rp - 300,000.00 Rp - New Item SI
6.00 Rp - 1,500,000.00 Rp - New Item SI
4.00 Rp - 1,000,000.00 Rp - New Item SI

4.00 Rp - 3,000,000.00 Rp - New Item SI

1.00 Rp - 1,500,000.00 Rp - New Item SI


1.00 Rp - 258,000.00 Rp - New Item SI
1.00 Rp - 1,000,000.00 Rp - New Item SI
65.11 Rp - 2,278,867.50 Rp - New Item SI
2.00 Rp - 170,000.00 Rp - New Item SI
1.00 Rp - 300,000.00 Rp - New Item SI
1.00 Rp - 300,000.00 Rp - New Item SI

- Rp 14,553,210.00 Rp -
Rp 107,599,179.0 Rp 84,733,979.00 Rp 14,553,210.00 Rp (29,829,565.00)

(A+B+C)= Rp 92,322,824.00
HAN TERMIJN :
p 30% Sblm Addendum -Rp 32,250,000.00 (Sudah ditransfer)
-Rp 39,745,000.00 (Sudah ditransfer)
-Rp 15,711,600.00
Yang Sudah Ditransfer sampai saat ini -Rp 87,706,600.00 (total)
TOTAL ADDITIONAL
TOTAL KONTRAK QTY TOTAL ACTUAL (Rp) TOTAL TAKEOUT (Rp)
(Rp)
KET
(A) ACTUAL ADDITIONAL TAKEOUT (B) (C)
Rp 92,322,824.00
Total Tagihan Dikurangi yang sudah ditransfer Rp 4,616,224.00
Total Tagihan Final yang diterima Retensi 5% : Rp 4,616,224.00 Dibulatkan -----> Rp 4,616,200.00 Final Tagihan100%