Anda di halaman 1dari 60

ANALISA HARGA SATUAN

KODE URAIAN PEKERJAAN VOL SAT HARGA SATUAN

A. PEKERJAAN PERSIAPAN

A.1 1 M2 Pekerjaan Pembersihan Lahan


Matrial / Bahan
Upah
1 Kenek 0.05 OH Rp 115,500.00
2 Tukang 0.02 OH Rp 147,000.00
3 Kepala Tukang 0.01 OH Rp 157,500.00
4 Mandor 0.01 OH Rp 210,000.00
TOTAL HARGA

A.2 1 M1 Pekerjaan Bowplank


Matrial / Bahan
1 Kayu Papan 0.25 lbr Rp 31,500.00
2 Kaso 4 x 6 x 400 0.5 btg Rp 31,500.00
3 Paku Kayu 0.05 kg Rp 16,800.00
Upah
1 Kenek 0.05 OH Rp 115,500.00
2 Tukang 0.01 OH Rp 147,000.00
3 Kepala Tukang 0.005 OH Rp 157,500.00
4 Mandor 0.005 OH Rp 210,000.00
TOTAL HARGA

A.3 1 M2 Pembongkaran Dinding Standar


Matrial / Bahan
Upah
1 Kenek 0.2 OH Rp 115,500.00
2 Tukang 0.1 OH Rp 147,000.00
3 Kepala Tukang 0.01 OH Rp 157,500.00
4 Mandor 0.01 OH Rp 210,000.00
TOTAL HARGA

A.4 1 M2 Pembongkaran Dinding High Standar


Matrial / Bahan
Upah
1 Kenek 0.5 OH Rp 115,500.00
2 Tukang 0.25 OH Rp 147,000.00
3 Kepala Tukang 0.025 OH Rp 157,500.00
4 Mandor 0.025 OH Rp 210,000.00
TOTAL HARGA
A.5 1 M2 Pembongkaran Plafond
Matrial / Bahan
Upah
1 Kenek 0.05 OH Rp 115,500.00
2 Tukang 0.025 OH Rp 147,000.00
3 Kepala Tukang 0.02 OH Rp 157,500.00
4 Mandor 0.02 OH Rp 210,000.00
TOTAL HARGA

A.6 1 M2 Pembongkaran Atap dan Rangka Atap


Matrial / Bahan
Upah
1 Kenek 0.1 OH Rp 115,500.00
2 Tukang 0.05 OH Rp 147,000.00
3 Kepala Tukang 0.02 OH Rp 157,500.00
4 Mandor 0.02 OH Rp 210,000.00
TOTAL HARGA

B. PEKERJAAN URUGAN DAN GALIAN

B.1 1 M3 Pekerjaan Galian Tanah


Matrial / Bahan
Upah
1 Kenek 0.43 OH Rp 115,500.00
2 Tukang 0.1 OH Rp 147,000.00
3 Kepala Tukang 0.05 OH Rp 157,500.00
4 Mandor 0.05 OH Rp 210,000.00
TOTAL HARGA

B.2 1 M3 Pekerjaan Urug Tanah Kembali


Matrial / Bahan
Upah
1 Kenek 0.05 OH Rp 115,500.00
2 Tukang 0.025 OH Rp 147,000.00
3 Kepala Tukang 0.01 OH Rp 157,500.00
4 Mandor 0.01 OH Rp 210,000.00
TOTAL HARGA

B.3 1 M3 Pengurugan Tanah dan Puing


Matrial / Bahan
1 Urugan Tanah / Puing 1.1 m3 Rp 315,000.00
Upah
1 Kenek 0.1 OH Rp 115,500.00
2 Tukang 0.1 OH Rp 147,000.00
3 Kepala Tukang 0.02 OH Rp 157,500.00
4 Mandor 0.01 OH Rp 210,000.00
TOTAL HARGA

B.4 1 M3 Pengurugan Pasir Urug


Matrial / Bahan
1 Pasir Urug 1 m3 Rp 189,000.00
Upah
1 Kenek 0.2 OH Rp 115,500.00
2 Tukang 0.1 OH Rp 147,000.00
3 Kepala Tukang 0.02 OH Rp 157,500.00
4 Mandor 0.02 OH Rp 210,000.00
TOTAL HARGA

B.5 1 M3 Pekerjaan Pemadatan Tanah


Matrial / Bahan
1 Sewa Stamper 0.1 hari Rp 315,000.00
Upah
1 Kenek 0.05 OH Rp 115,500.00
2 Tukang 0.05 OH Rp 147,000.00
3 Kepala Tukang 0.01 OH Rp 157,500.00
4 Mandor 0.01 OH Rp 210,000.00
TOTAL HARGA

C. PEKERJAAN PASANGAN

C.1 1 M3 Pemasangan Batu Kosong (Anstamping)


Matrial / Bahan
1 Batu Belah 1.2 m3 Rp 262,500.00
2 Agregat 0.1 m3 Rp 330,750.00
Upah
1 Kenek 0.5 OH Rp 115,500.00
2 Tukang 0.3 OH Rp 147,000.00
3 Kepala Tukang 0.2 OH Rp 157,500.00
4 Mandor 0.1 OH Rp 210,000.00
TOTAL HARGA

C.2 1 M3 Pasangan Pondasi Batu Kali 1Pc : 5Ps


Matrial / Bahan
1 Batu Belah 1.2 m3 Rp 262,500.00
2 Semen PC 50 kg 3.1 sak Rp 52,500.00
3 Pasir Pasang 0.4 m3 Rp 367,500.00
Upah
1 Kenek 1 OH Rp 115,500.00
2 Tukang 1 OH Rp 147,000.00
3 Kepala Tukang 0.2 OH Rp 157,500.00
4 Mandor 0.1 OH Rp 210,000.00
TOTAL HARGA

C.3 1 M2 Pasangan Dinding Hebel / Bata Ringan


Matrial / Bahan
1 Hebel 10 cm 0.10 m3 Rp 630,000.00
2 Mortar Perekat Hebel 40 kg 0.07 sak Rp 89,250.00
Upah
1 Kenek 0.3 OH Rp 115,500.00
2 Tukang 0.1 OH Rp 147,000.00
3 Kepala Tukang 0.02 OH Rp 157,500.00
4 Mandor 0.015 OH Rp 210,000.00
TOTAL HARGA

C.4 1 M2 Pasangan Dinding Bata Merah 1PC : 5PS


Matrial / Bahan
1 Bata Merah press 70.0 bh Rp 840.00
2 Semen PC 50 kg 0.19 sak Rp 52,500.00
3 Pasir Pasang 0.04 m3 Rp 367,500.00
Upah
1 Kenek 0.35 OH Rp 115,500.00
2 Tukang 0.10 OH Rp 147,000.00
3 Kepala Tukang 0.01 OH Rp 157,500.00
4 Mandor 0.02 OH Rp 210,000.00
TOTAL HARGA

C.5 1 M2 Pasangan Dinding Rooster 1PC : 5PS


Matrial / Bahan
1 Rooster 20x20 25.0 bh Rp 21,000.00
2 Semen PC 50 kg 0.22 sak Rp 52,500.00
3 Pasir Pasang 0.04 m3 Rp 367,500.00
Upah
1 Kenek 0.30 OH Rp 115,500.00
2 Tukang 0.10 OH Rp 147,000.00
3 Kepala Tukang 0.01 OH Rp 157,500.00
4 Mandor 0.02 OH Rp 210,000.00
TOTAL HARGA

D. PEKERJAAN BETON

D.1 1 M3 Pasangan Pondasi Foot Plat 1Pc : 3Ps : 2Kr


Matrial / Bahan
1 Semen PC 50 kg 6.94 sak Rp 52,500.00
2 Pasir Pasang 0.50 m3 Rp 367,500.00
3 Split 0.33 m3 Rp 404,250.00
4 Footplat Uk. 60cm x 60cm x 30cm 9.26 bh Rp 186,900.00
5 Triplek 9 mm 0.25 lbr Rp 110,250.00
6 Paku Kayu 0.03 kg Rp 16,800.00
Upah
1 Kenek 1 OH Rp 115,500.00
2 Tukang 1 OH Rp 147,000.00
3 Kepala Tukang 0.2 OH Rp 157,500.00
4 Mandor 0.1 OH Rp 210,000.00
TOTAL HARGA

D.2 1 M3 Sloof Beton Bertulang Uk. 15/20 K225


Matrial / Bahan
1 Semen PC 50 kg 6.94 sak Rp 52,500.00
2 Pasir Pasang 0.50 m3 Rp 367,500.00
3 Split 0.33 m3 Rp 404,250.00
4 Bendrat 4.20 kg Rp 21,000.00
5 Besi Ø 12 mm 16.67 btg Rp 108,150.00
6 Besi Ø 10 mm 16.67 btg Rp 84,000.00
7 Triplek 9 mm 8.10 lbr Rp 110,250.00
8 Kaso 4 x 6 x 400 64.81 btg Rp 31,500.00
9 Paku Kayu 3.65 kg Rp 16,800.00
Upah
1 Kenek 2.5 OH Rp 115,500.00
2 Tukang 5.7 OH Rp 147,000.00
3 Kepala Tukang 1.0 OH Rp 157,500.00
4 Mandor 1.0 OH Rp 210,000.00
TOTAL HARGA

D.3 1 M3 Sloof Beton Bertulang Uk. 15/25 K225


Matrial / Bahan
1 Semen PC 50 kg 6.94 sak Rp 52,500.00
2 Pasir Pasang 0.50 m3 Rp 367,500.00
3 Split 0.33 m3 Rp 404,250.00
4 Bendrat 3.21 kg Rp 21,000.00
5 Besi Ø 12 mm 13.33 btg Rp 108,150.00
6 Besi Ø 10 mm 11.85 btg Rp 84,000.00
7 Triplek 9 mm 7.41 lbr Rp 110,250.00
8 Kaso 4 x 6 x 400 54.81 btg Rp 31,500.00
9 Paku Kayu 3.11 kg Rp 16,800.00
Upah
1 Kenek 2.5 OH Rp 115,500.00
2 Tukang 5.7 OH Rp 147,000.00
3 Kepala Tukang 1.0 OH Rp 157,500.00
4 Mandor 1.0 OH Rp 210,000.00
TOTAL HARGA

D.4 1 M3 Sloof Beton Bertulang Uk. 15/30 K225


Matrial / Bahan
1 Semen PC 50 kg 6.94 sak Rp 52,500.00
2 Pasir Pasang 0.50 m3 Rp 367,500.00
3 Split 0.33 m3 Rp 404,250.00
4 Bendrat 3.35 kg Rp 21,000.00
5 Besi Ø 12 mm 14.81 btg Rp 108,150.00
6 Besi Ø 10 mm 11.11 btg Rp 84,000.00
7 Triplek 9 mm 6.94 lbr Rp 110,250.00
8 Kaso 4 x 6 x 400 48.15 btg Rp 31,500.00
9 Paku Kayu 2.75 kg Rp 16,800.00
Upah
1 Kenek 2.5 OH Rp 115,500.00
2 Tukang 5.7 OH Rp 147,000.00
3 Kepala Tukang 1.0 OH Rp 157,500.00
4 Mandor 1.0 OH Rp 210,000.00
TOTAL HARGA

D.5 1 M3 Kolom Beton Bertulang Uk. 15/15 K225


Matrial / Bahan
1 Semen PC 50 kg 6.94 sak Rp 52,500.00
2 Pasir Pasang 0.50 m3 Rp 367,500.00
3 Split 0.33 m3 Rp 404,250.00
4 Bendrat 3.73 kg Rp 21,000.00
5 Besi Ø 12 mm 14.81 btg Rp 108,150.00
6 Besi Ø 10 mm 14.81 btg Rp 84,000.00
7 Triplek 9 mm 9.26 lbr Rp 110,250.00
8 Kaso 4 x 6 x 400 74.07 btg Rp 31,500.00
9 Paku Kayu 4.17 kg Rp 16,800.00
Upah
1 Kenek 2.5 OH Rp 115,500.00
2 Tukang 5.7 OH Rp 147,000.00
3 Kepala Tukang 1.0 OH Rp 157,500.00
4 Mandor 1.0 OH Rp 210,000.00
TOTAL HARGA

D.6 1 M3 Kolom Beton Bertulang Uk. 15/20 K225


Matrial / Bahan
1 Semen PC 50 kg 6.94 sak Rp 52,500.00
2 Pasir Pasang 0.50 m3 Rp 367,500.00
3 Split 0.33 m3 Rp 404,250.00
4 Bendrat 3.82 kg Rp 21,000.00
5 Besi Ø 12 mm 16.67 btg Rp 108,150.00
6 Besi Ø 10 mm 12.96 btg Rp 84,000.00
7 Triplek 9 mm 8.10 lbr Rp 110,250.00
8 Kaso 4 x 6 x 400 57.41 btg Rp 31,500.00
9 Paku Kayu 3.28 kg Rp 16,800.00
Upah
1 Kenek 2.5 OH Rp 115,500.00
2 Tukang 5.7 OH Rp 147,000.00
3 Kepala Tukang 1.0 OH Rp 157,500.00
4 Mandor 1.0 OH Rp 210,000.00
TOTAL HARGA
D.7 1 M3 Kolom Beton Bertulang Uk. 15/25 K225
Matrial / Bahan
1 Semen PC 50 kg 6.94 sak Rp 52,500.00
2 Pasir Pasang 0.50 m3 Rp 367,500.00
3 Split 0.33 m3 Rp 404,250.00
4 Bendrat 3.21 kg Rp 21,000.00
5 Besi Ø 12 mm 13.33 btg Rp 108,150.00
6 Besi Ø 10 mm 11.85 btg Rp 84,000.00
7 Triplek 9 mm 7.41 lbr Rp 110,250.00
8 Kaso 4 x 6 x 400 47.41 btg Rp 31,500.00
9 Paku Kayu 2.74 kg Rp 16,800.00
Upah
1 Kenek 2.5 OH Rp 115,500.00
2 Tukang 5.7 OH Rp 147,000.00
3 Kepala Tukang 1.0 OH Rp 157,500.00
4 Mandor 1.0 OH Rp 210,000.00
TOTAL HARGA

D.8 1 M3 Kolom Beton Bertulang Uk. 15/30 K225


Matrial / Bahan
1 Semen PC 50 kg 6.94 sak Rp 52,500.00
2 Pasir Pasang 0.50 m3 Rp 367,500.00
3 Split 0.33 m3 Rp 404,250.00
4 Bendrat 3.35 kg Rp 21,000.00
5 Besi Ø 12 mm 14.81 btg Rp 108,150.00
6 Besi Ø 10 mm 11.11 btg Rp 84,000.00
7 Triplek 9 mm 6.94 lbr Rp 110,250.00
8 Kaso 4 x 6 x 400 40.74 btg Rp 31,500.00
9 Paku Kayu 2.38 kg Rp 16,800.00
Upah
1 Kenek 2.5 OH Rp 115,500.00
2 Tukang 5.7 OH Rp 147,000.00
3 Kepala Tukang 1.0 OH Rp 157,500.00
4 Mandor 1.0 OH Rp 210,000.00
TOTAL HARGA

D.9 1 M3 Kolom Beton Bertulang Uk. 15/40 K225


Matrial / Bahan
1 Semen PC 50 kg 6.94 sak Rp 52,500.00
2 Pasir Pasang 0.50 m3 Rp 367,500.00
3 Split 0.33 m3 Rp 404,250.00
4 Bendrat 2.70 kg Rp 21,000.00
5 Besi Ø 12 mm 11.11 btg Rp 108,150.00
6 Besi Ø 10 mm 10.19 btg Rp 84,000.00
7 Triplek 9 mm 6.37 lbr Rp 110,250.00
8 Kaso 4 x 6 x 400 32.41 btg Rp 31,500.00
9 Paku Kayu 1.94 kg Rp 16,800.00
Upah
1 Kenek 2.5 OH Rp 115,500.00
2 Tukang 5.7 OH Rp 147,000.00
3 Kepala Tukang 1.0 OH Rp 157,500.00
4 Mandor 1.0 OH Rp 210,000.00
TOTAL HARGA

D.10 1 M3 Balok Beton Bertulang Uk. 15/15 K225


Matrial / Bahan
1 Semen PC 50 kg 6.94 sak Rp 52,500.00
2 Pasir Pasang 0.50 m3 Rp 367,500.00
3 Split 0.33 m3 Rp 404,250.00
4 Bendrat 3.73 kg Rp 21,000.00
5 Besi Ø 12 mm 14.81 btg Rp 108,150.00
6 Besi Ø 10 mm 14.81 btg Rp 84,000.00
7 Triplek 9 mm 9.26 lbr Rp 110,250.00
8 Kaso 4 x 6 x 400 81.48 btg Rp 31,500.00
9 Paku Kayu 4.54 kg Rp 16,800.00
Upah
1 Kenek 2.5 OH Rp 115,500.00
2 Tukang 5.7 OH Rp 147,000.00
3 Kepala Tukang 1.0 OH Rp 157,500.00
4 Mandor 1.0 OH Rp 210,000.00
TOTAL HARGA

D.11 1 M3 Balok Beton Bertulang Uk. 15/20 K225


Matrial / Bahan
1 Semen PC 50 kg 6.94 sak Rp 52,500.00
2 Pasir Pasang 0.50 m3 Rp 367,500.00
3 Split 0.33 m3 Rp 404,250.00
4 Bendrat 3.82 kg Rp 21,000.00
5 Besi Ø 12 mm 16.67 btg Rp 108,150.00
6 Besi Ø 10 mm 12.96 btg Rp 84,000.00
7 Triplek 9 mm 8.10 lbr Rp 110,250.00
8 Kaso 4 x 6 x 400 64.81 btg Rp 31,500.00
9 Paku Kayu 3.65 kg Rp 16,800.00
Upah
1 Kenek 2.5 OH Rp 115,500.00
2 Tukang 5.7 OH Rp 147,000.00
3 Kepala Tukang 1.0 OH Rp 157,500.00
4 Mandor 1.0 OH Rp 210,000.00
TOTAL HARGA

D.12 1 M3 Balok Beton Bertulang Uk. 15/30 K225


Matrial / Bahan
1 Semen PC 50 kg 6.94 sak Rp 52,500.00
2 Pasir Pasang 0.50 m3 Rp 367,500.00
3 Split 0.33 m3 Rp 404,250.00
4 Bendrat 3.35 kg Rp 21,000.00
5 Besi Ø 12 mm 14.81 btg Rp 108,150.00
6 Besi Ø 10 mm 11.11 btg Rp 84,000.00
7 Triplek 9 mm 6.94 lbr Rp 110,250.00
8 Kaso 4 x 6 x 400 48.15 btg Rp 31,500.00
9 Paku Kayu 2.75 kg Rp 16,800.00
Upah
1 Kenek 2.5 OH Rp 115,500.00
2 Tukang 5.7 OH Rp 147,000.00
3 Kepala Tukang 1.0 OH Rp 157,500.00
4 Mandor 1.0 OH Rp 210,000.00
TOTAL HARGA

D.13 1 M3 Balok Beton Bertulang Uk. 15/40 K225


Matrial / Bahan
1 Semen PC 50 kg 6.94 sak Rp 52,500.00
2 Pasir Pasang 0.50 m3 Rp 367,500.00
3 Split 0.33 m3 Rp 404,250.00
4 Bendrat 2.70 kg Rp 21,000.00
5 Besi Ø 12 mm 11.11 btg Rp 108,150.00
6 Besi Ø 10 mm 10.19 btg Rp 84,000.00
7 Triplek 9 mm 6.37 lbr Rp 110,250.00
8 Kaso 4 x 6 x 400 39.81 btg Rp 31,500.00
9 Paku Kayu 2.31 kg Rp 16,800.00
Upah
1 Kenek 2.5 OH Rp 115,500.00
2 Tukang 5.7 OH Rp 147,000.00
3 Kepala Tukang 1.0 OH Rp 157,500.00
4 Mandor 1.0 OH Rp 210,000.00
TOTAL HARGA

D.14 1 M3 Dak Cor / Plat Lantai Kerja K225


Matrial / Bahan
1 Semen PC 50 kg 6.9 sak Rp 52,500.00
2 Pasir Pasang 0.5 m3 Rp 367,500.00
3 Split 0.3 m3 Rp 404,250.00
4 Wiremesh M8 1.2 lbr Rp 819,000.00
5 Bondek 0,75mm 100 x 400 1.1 lbr Rp 882,000.00
6 Bambu 13.3 btg Rp 26,250.00
7 Sewa Molen 0.1 hr Rp 682,500.00
Upah
1 Kenek 2.5 OH Rp 115,500.00
2 Tukang 5.7 OH Rp 147,000.00
3 Kepala Tukang 1.0 OH Rp 157,500.00
4 Mandor 1.0 OH Rp 210,000.00
TOTAL HARGA

D.15 1 M3 Dak Talang / Kanopi Beton K225


Matrial / Bahan
1 Semen PC 50 kg 6.9 sak Rp 52,500.00
2 Pasir Pasang 0.5 m3 Rp 367,500.00
3 Split 0.3 m3 Rp 404,250.00
4 Bendrat 4.0 kg Rp 21,000.00
5 Besi Ø 10 mm 10.8 btg Rp 84,000.00
6 Triplek 9 mm 3.5 lbr Rp 110,250.00
7 Bambu 20.0 btg Rp 26,250.00
Upah
1 Kenek 2.5 OH Rp 115,500.00
2 Tukang 5.7 OH Rp 147,000.00
3 Kepala Tukang 1.0 OH Rp 157,500.00
4 Mandor 1.0 OH Rp 210,000.00
TOTAL HARGA

D.16 1 M3 Tangga Beton Bertulang K225


Matrial / Bahan
1 Semen PC 50 kg 6.9 sak Rp 52,500.00
2 Pasir Pasang 0.5 m3 Rp 367,500.00
3 Split 0.3 m3 Rp 404,250.00
4 Bendrat 6.6 kg Rp 21,000.00
5 Besi Ø 10 mm 17.8 btg Rp 84,000.00
6 Kayu Papan 0.2 x 4 15.8 lbr Rp 42,000.00
7 Paku Kayu 1.6 kg Rp 16,800.00
Upah
1 Kenek 2.5 OH Rp 115,500.00
2 Tukang 5.7 OH Rp 147,000.00
3 Kepala Tukang 1.0 OH Rp 157,500.00
4 Mandor 1.0 OH Rp 210,000.00
TOTAL HARGA

E. PEKERJAAN PLESTERAN

E.1 1 M2 Plesteran Dinding 1PC : 5PP Tebal 20mm


Matrial / Bahan
1 Semen PC 50 kg 0.14 sak Rp 52,500.00
2 Pasir Pasang 0.02 m3 Rp 367,500.00
Upah
1 Kenek 0.25 OH Rp 115,500.00
2 Tukang 0.15 OH Rp 147,000.00
3 Kepala Tukang 0.05 OH Rp 157,500.00
4 Mandor 0.05 OH Rp 210,000.00
TOTAL HARGA

E.2 1 M2 Plesteran Dinding Kamprot 1PC : 2PP Tebal 20mm


Matrial / Bahan
1 Semen PC 50 kg 0.09 sak Rp 52,500.00
2 Pasir Pasang 0.01 m3 Rp 367,500.00
Upah
1 Kenek 0.25 OH Rp 115,500.00
2 Tukang 0.15 OH Rp 147,000.00
3 Kepala Tukang 0.05 OH Rp 157,500.00
4 Mandor 0.05 OH Rp 210,000.00
TOTAL HARGA

D.5 1 M2 Acian Dinding


E.3 Matrial / Bahan
1 Semen PC 50 kg 0.065 sak Rp 52,500.00
Upah
1 Kenek 0.2 OH Rp 115,500.00
2 Tukang 0.1 OH Rp 147,000.00
3 Kepala Tukang 0.01 OH Rp 157,500.00
4 Mandor 0.01 OH Rp 210,000.00

F. PEKERJAAN LANTAI DAN PELAPIS DINDING

F.1 1 M2 Pekerjaan Screed Lantai


Matrial / Bahan
1 Wiremesh M6 0.09 lbr Rp 472,500.00
2 Semen PC 50 kg 0.52 sak Rp 52,500.00
3 Pasir Pasang 0.05 m3 Rp 367,500.00
4 Split 0.04 m3 Rp 404,250.00
Upah
1 Kenek 2.0 OH Rp 115,500.00
2 Tukang 1.0 OH Rp 147,000.00
3 Kepala Tukang 0.1 OH Rp 157,500.00
4 Mandor 0.1 OH Rp 210,000.00
TOTAL HARGA

F.2 1 M2 Pekerjaan Carport


Matrial / Bahan
1 Wiremesh M6 0.09 lbr Rp 472,500.00
2 Semen PC 50 kg 0.52 sak Rp 52,500.00
3 Pasir Pasang 0.05 m3 Rp 367,500.00
4 Split 0.04 m3 Rp 404,250.00
Upah
1 Kenek 2.0 OH Rp 115,500.00
2 Tukang 1.0 OH Rp 147,000.00
3 Kepala Tukang 0.1 OH Rp 157,500.00
4 Mandor 0.1 OH Rp 210,000.00
TOTAL HARGA

F.3 1 M2 Pekerjaan Lantai Keramik 50x50


Matrial / Bahan
1 Keramik 50x50 1.10 m2 Rp 110,250.00
2 Semen PC 50 kg 0.26 sak Rp 52,500.00
3 Pasir Pasang 0.04 m3 Rp 367,500.00
4 Semen Putih 40 KG 0.03 sak Rp 105,000.00
Upah
1 Kenek 0.15 OH Rp 115,500.00
2 Tukang 0.1 OH Rp 147,000.00
3 Kepala Tukang 0.05 OH Rp 157,500.00
4 Mandor 0.05 OH Rp 210,000.00
TOTAL HARGA

F.4 1 M2 Pekerjaan Lantai Keramik 25x25


Matrial / Bahan
1 Keramik 25X25 1.10 m2 Rp 89,250.00
2 Semen PC 50 kg 0.26 sak Rp 52,500.00
3 Pasir Pasang 0.04 m3 Rp 367,500.00
4 Semen Putih 40 KG 0.03 sak Rp 105,000.00
Upah
1 Kenek 0.15 OH Rp 115,500.00
2 Tukang 0.1 OH Rp 147,000.00
3 Kepala Tukang 0.05 OH Rp 157,500.00
4 Mandor 0.05 OH Rp 210,000.00
TOTAL HARGA

F.5 1 M2 Pekerjaan Lantai Keramik 25x40


Matrial / Bahan
1 Keramik 25 X 40 1.10 m2 Rp 89,250.00
2 Semen PC 50 kg 0.26 sak Rp 52,500.00
3 Pasir Pasang 0.04 m3 Rp 367,500.00
4 Semen Putih 40 KG 0.03 sak Rp 105,000.00
Upah
1 Kenek 0.15 OH Rp 115,500.00
2 Tukang 0.1 OH Rp 147,000.00
3 Kepala Tukang 0.05 OH Rp 157,500.00
4 Mandor 0.05 OH Rp 210,000.00
TOTAL HARGA

F.6 1 M2 Pekerjaan Lantai Granit 60x60


Matrial / Bahan
1 Granit 60x60 1.10 m2 Rp 231,000.00
2 Semen PC 50 kg 0.35 sak Rp 52,500.00
3 Pasir Pasang 0.04 m3 Rp 367,500.00
4 Semen Putih 40 KG 0.03 sak Rp 105,000.00
Upah
1 Kenek 0.25 OH Rp 115,500.00
2 Tukang 0.125 OH Rp 147,000.00
3 Kepala Tukang 0.013 OH Rp 157,500.00
4 Mandor 0.013 OH Rp 210,000.00
TOTAL HARGA

F.7 1 M2 Pekerjaan 3D Wall Panel


Matrial / Bahan
1 3D Wall Panel 1.10 m2 Rp 252,000.00
2 Sealant 0.10 bh Rp 33,600.00
Upah
1 Kenek 0.1 OH Rp 115,500.00
2 Tukang 0.05 OH Rp 147,000.00
3 Kepala Tukang 0.01 OH Rp 157,500.00
4 Mandor 0.01 OH Rp 210,000.00
TOTAL HARGA

F.8 1 M2 Pekerjaan Metal Cutting


Matrial / Bahan
1 Metal Cutting 1.10 m2 Rp 4,488,750.00
Upah
1 Kenek 0.8 OH Rp 115,500.00
2 Tukang 0.5 OH Rp 147,000.00
3 Kepala Tukang 0.01 OH Rp 157,500.00
4 Mandor 0.01 OH Rp 210,000.00
TOTAL HARGA

F.9 1 M2 Pekerjaan ACP Cutting


Matrial / Bahan
1 ACP Cutting 1.10 m2 Rp 2,073,750.00
Upah
1 Kenek 0.8 OH Rp 115,500.00
2 Tukang 0.5 OH Rp 147,000.00
3 Kepala Tukang 0.01 OH Rp 157,500.00
4 Mandor 0.01 OH Rp 210,000.00
TOTAL HARGA

G. PEKERJAAN KUSEN PINTU DAN JENDELA

G.1 1 SET Pekerjaan Kusen + Pintu 80cm x 200cm


Matrial / Bahan
1 Kusen + Pintu Baja Urban 80cm x 200cm x 4cm 1.00 set Rp 1,968,750.00
Upah
1 Kenek 0.5 OH Rp 115,500.00
2 Tukang 0.5 OH Rp 147,000.00
3 Kepala Tukang 0.025 OH Rp 157,500.00
4 Mandor 0.025 OH Rp 210,000.00
TOTAL HARGA

G.2 1 SET Pekerjaan Kusen + Pintu 90cm x 230cm


Matrial / Bahan
1 Kusen + Pintu Baja JBS 90cm x 210cm x 5cm 1.00 set Rp 3,609,375.00
Upah
1 Kenek 1 OH Rp 115,500.00
2 Tukang 0.05 OH Rp 147,000.00
3 Kepala Tukang 0.025 OH Rp 157,500.00
4 Mandor 0.025 OH Rp 210,000.00
TOTAL HARGA

G.3 1 SET Pekerjaan Kusen + Pintu 120cm x 210cm


Matrial / Bahan
1 Kusen + Pintu Baja JBS 120cm x 210cm x 5cm 1.00 set Rp 5,250,000.00
Upah
1 Kenek 1 OH Rp 115,500.00
2 Tukang 0.05 OH Rp 147,000.00
3 Kepala Tukang 0.025 OH Rp 157,500.00
4 Mandor 0.025 OH Rp 210,000.00
TOTAL HARGA

G.4 1 SET Pekerjaan Kusen + Pintu 150cm x 230cm


Matrial / Bahan
1 Kusen + Pintu Baja JBS 150cm x 210cm x 5cm 1.00 set Rp 6,890,100.00
Upah
1 Kenek 1 OH Rp 115,500.00
2 Tukang 0.05 OH Rp 147,000.00
3 Kepala Tukang 0.025 OH Rp 157,500.00
4 Mandor 0.025 OH Rp 210,000.00
TOTAL HARGA

G.5 1 SET Pekerjaan Kusen Alumunium + Jendela 80cm x 210cm


Matrial / Bahan
1 Kusen Alumunium + Jendela 80cm x 200cm 1.00 set Rp 1,812,298.95
Upah
1 Kenek 1 OH Rp 115,500.00
2 Tukang 0.05 OH Rp 147,000.00
3 Kepala Tukang 0.025 OH Rp 157,500.00
4 Mandor 0.025 OH Rp 210,000.00
TOTAL HARGA

G.6 1 SET Pekerjaan Kusen Alumunium + Jendela 60cm x 180cm


Matrial / Bahan
1 Kusen Alumunium + Jendela 60cm x 180cm 1.00 set Rp 1,629,600.00
Upah
1 Kenek 1 OH Rp 115,500.00
2 Tukang 0.05 OH Rp 147,000.00
3 Kepala Tukang 0.025 OH Rp 157,500.00
4 Mandor 0.025 OH Rp 210,000.00
TOTAL HARGA
H. PEKERJAAN RAILING DAN PARTISI

H.1 1 M1 Pekerjaan Railing Hollow Galvanis


Matrial / Bahan
1 Railing Hollow Galvanis 1.00 m1 Rp 553,350.00
Upah
1 Kenek 0.01 OH Rp 115,500.00
2 Tukang 0.01 OH Rp 147,000.00
3 Kepala Tukang 0.01 OH Rp 157,500.00
4 Mandor 0.01 OH Rp 210,000.00
TOTAL HARGA

H.2 1 M1 Pekerjaan Railing Kaca Tempered


Matrial / Bahan
1 Railing Kaca Tempered + Hollow 1.00 m4 Rp 1,916,250.00
Upah
1 Kenek 0.01 OH Rp 115,500.00
2 Tukang 0.01 OH Rp 147,000.00
3 Kepala Tukang 0.01 OH Rp 157,500.00
4 Mandor 0.01 OH Rp 210,000.00
TOTAL HARGA

H.3 1 M2 Pekerjaan Pagar Besi Hollow


Matrial / Bahan
1 Pagar Besi Hollow 1.00 m2 Rp 765,000.00
Upah
1 Kenek 0.01 OH Rp 115,500.00
2 Tukang 0.01 OH Rp 147,000.00
3 Kepala Tukang 0.01 OH Rp 157,500.00
4 Mandor 0.01 OH Rp 210,000.00
TOTAL HARGA

H.3 1 M2 Pekerjaan Partisi GRC Board


Matrial / Bahan
1 Rangka Hollow Galvalum 40x40 3.00 btg Rp 42,000.00
2 GRC 4 mm 0.35 lbr Rp 94,500.00
3 Paku GRC 0.20 dus Rp 26,250.00
Upah
1 Kenek 0.2 OH Rp 115,500.00
2 Tukang 0.1 OH Rp 147,000.00
3 Kepala Tukang 0.05 OH Rp 157,500.00
4 Mandor 0.05 OH Rp 210,000.00
TOTAL HARGA
I. PEKERJAAN RANGKA DAN PENUTUP ATAP

I.1 1 M2 Pemasangan Rangka Atap Baja Ringan


Matrial / Bahan
1 Canal / Kaso 0.75mm 0.50 btg Rp 112,350.00
2 Reng 0.45mm 1.00 btg Rp 65,100.00
3 Screw 35.00 bh Rp 525.00
Upah
1 Kenek 0.2 OH Rp 115,500.00
2 Tukang 0.1 OH Rp 147,000.00
3 Kepala Tukang 0.01 OH Rp 157,500.00
4 Mandor 0.01 OH Rp 210,000.00
TOTAL HARGA

I.2 1 M2 Pemasangan Genteng Metal


Matrial / Bahan
1 Genteng Metal Pasir 82 x 75 0.35mm 1.63 lbr Rp 65,625.00
2 Paku Sekrup 25.00 bh Rp 210.00
Upah
1 Kenek 0.2 OH Rp 115,500.00
2 Tukang 0.1 OH Rp 147,000.00
3 Kepala Tukang 0.01 OH Rp 157,500.00
4 Mandor 0.01 OH Rp 210,000.00
TOTAL HARGA

I.3 1 M2 Pemasangan Genteng Beton


Matrial / Bahan
1 Genteng Beton Gelombang 11.00 bh Rp 12,600.00
2 Paku Beton 1.00 kg Rp 17,850.00
Upah
1 Kenek 0.1 OH Rp 115,500.00
2 Tukang 0.05 OH Rp 147,000.00
3 Kepala Tukang 0.03 OH Rp 157,500.00
4 Mandor 0.02 OH Rp 210,000.00
TOTAL HARGA

I.4 1 M2 Pemasangan Atap Spandek


Matrial / Bahan
1 Spandek 1.00 m2 Rp 84,000.00
Upah
1 Kenek 0.12 OH Rp 115,500.00
2 Tukang 0.06 OH Rp 147,000.00
3 Kepala Tukang 0.01 OH Rp 157,500.00
4 Mandor 0.01 OH Rp 210,000.00
TOTAL HARGA

J. PEKERJAAN PLAFOND
J.1 1 M2 Pekerjaan Plafond Gypsum + Rangka Hollow
Matrial / Bahan
1 Rangka Hollow Galvalum 40x40 0.50 btg Rp 42,000.00
2 Rangka Hollow Galvalum 20x20 1.00 btg Rp 31,500.00
3 Gipsum 9 mm Jayaboard 0.36 lbr Rp 81,900.00
4 Paku Gipsum 0.11 kg Rp 18,375.00
5 Kompon Aplus 20 kg 0.13 sak Rp 78,750.00
Upah
1 Kenek 0.2 OH Rp 115,500.00
2 Tukang 0.1 OH Rp 147,000.00
3 Kepala Tukang 0.02 OH Rp 157,500.00
4 Mandor 0.02 OH Rp 210,000.00
TOTAL HARGA

J.2 1 M2 Pekerjaan Plafond GRC Board + Rangka Hollow


Matrial / Bahan
1 Rangka Hollow Galvalum 40x40 1.00 btg Rp 42,000.00
2 Rangka Hollow Galvalum 20x20 1.00 btg Rp 31,500.00
3 GRC 4 mm 0.36 lbr Rp 94,500.00
4 Paku GRC 0.11 dus Rp 26,250.00
5 Kompon Aplus 20 kg 0.13 sak Rp 78,750.00
Upah
1 Kenek 0.2 OH Rp 115,500.00
2 Tukang 0.15 OH Rp 147,000.00
3 Kepala Tukang 0.035 OH Rp 157,500.00
4 Mandor 0.018 OH Rp 210,000.00
TOTAL HARGA

J.3 1 M2 Pekerjaan Plafond PVC


Matrial / Bahan
1 Plafond PVC 1.00 m2 Rp 175,350.00
Upah
1 Kenek 0.05 OH Rp 115,500.00
2 Tukang 0.01 OH Rp 147,000.00
3 Kepala Tukang 0.01 OH Rp 157,500.00
4 Mandor 0.01 OH Rp 210,000.00
TOTAL HARGA

J.4 1 M1 Pekerjaan List Plafond Gypsum


Matrial / Bahan
1 Lis Plafon Gypsum 1.05 m' Rp 31,500.00
2 Kompon Aplus 20 kg 0.15 sak Rp 78,750.00
Upah
1 Kenek 0.08 OH Rp 115,500.00
2 Tukang 0.05 OH Rp 147,000.00
3 Kepala Tukang 0.01 OH Rp 157,500.00
4 Mandor 0.01 OH Rp 210,000.00
TOTAL HARGA

J.5 1 M1 Pekerjaan List Plafond PVC


Matrial / Bahan
1 Lis Plafond PVC 1.05 m' Rp -
2 Screw 18.00 bh Rp 525.00
Upah
1 Kenek 0.1 OH Rp 115,500.00
2 Tukang 0.05 OH Rp 147,000.00
3 Kepala Tukang 0.01 OH Rp 157,500.00
4 Mandor 0.01 OH Rp 210,000.00
TOTAL HARGA

K. PEKERJAAN PENGECATAN

K.1 1 M2 Pengecatan Dinding Interior


Matrial / Bahan
1 Plamir Dinding 0.1 kg Rp 18,900.00
2 Cat Alkali Primer 0.10 kg Rp 33,600.00
3 Cat Interior 0.26 kg Rp 37,800.00
4 Amplas 0.50 m2 Rp 3,150.00
Upah
1 Kenek 0.05 OH Rp 115,500.00
2 Tukang 0.05 OH Rp 147,000.00
3 Kepala Tukang 0.007 OH Rp 157,500.00
4 Mandor 0.007 OH Rp 210,000.00
TOTAL HARGA

K.2 1 M2 Pengecatan Dinding Exterior


Matrial / Bahan
1 Plamir Dinding 0.1 kg Rp 18,900.00
2 Cat Alkali Primer 0.10 kg Rp 33,600.00
3 Cat Interior 0.26 kg Rp 37,800.00
4 Amplas 1.00 m2 Rp 3,150.00
Upah
1 Kenek 0.1 OH Rp 115,500.00
2 Tukang 0.05 OH Rp 147,000.00
3 Kepala Tukang 0.01 OH Rp 157,500.00
4 Mandor 0.01 OH Rp 210,000.00
TOTAL HARGA

K.3 1 M2 Pengecatan Waterproof


Matrial / Bahan
1 Cat Alkali Primer 0.01 kg Rp 33,600.00
2 Cat Aquaproof 0.80 kg Rp 52,500.00
3 Amplas 1.00 m2 Rp 3,150.00
Upah
1 Kenek 0.1 OH Rp 115,500.00
2 Tukang 0.05 OH Rp 147,000.00
3 Kepala Tukang 0.01 OH Rp 157,500.00
4 Mandor 0.01 OH Rp 210,000.00
TOTAL HARGA

L. PEKERJAAN LISTRIK

L.1 1 TTK Pek. Instalasi Lampu Downlight 15W


Matrial / Bahan
1 Lampu Downlight 15W 1.00 bh Rp 121,485.00
3 T DOS 1.00 bh Rp 3,150.00
Upah
1 Kenek 0.1 OH Rp 115,500.00
2 Tukang 0.05 OH Rp 147,000.00
3 Kepala Tukang 0.025 OH Rp 157,500.00
4 Mandor 0.025 OH Rp 210,000.00
TOTAL HARGA

L.2 1 TTK Pek. Instalasi Lampu Downlight 5W


Matrial / Bahan
1 Lampu Downlight 5W 1.00 bh Rp 81,375.00
2 T DOS 1.00 bh Rp 3,150.00
Upah
1 Kenek 0.1 OH Rp 115,500.00
2 Tukang 0.05 OH Rp 147,000.00
3 Kepala Tukang 0.025 OH Rp 157,500.00
4 Mandor 0.025 OH Rp 210,000.00
TOTAL HARGA

L.3 1 TTK Pek. Instalasi Stop Kontak


Matrial / Bahan
1 Stop Kontak Brocco 1.00 bh Rp 56,175.00
2 T DOS 1.00 bh Rp 3,150.00
Upah
1 Kenek 0.1 OH Rp 115,500.00
2 Tukang 0.05 OH Rp 147,000.00
3 Kepala Tukang 0.025 OH Rp 157,500.00
4 Mandor 0.025 OH Rp 210,000.00
TOTAL HARGA

L.4 1 TTK Pek. Instalasi Saklar Single


Matrial / Bahan
1 Saklar Single Brocco 1.00 bh Rp 55,125.00
2 T DOS 1.00 bh Rp 3,150.00
Upah
1 Kenek 0.1 OH Rp 115,500.00
2 Tukang 0.05 OH Rp 147,000.00
3 Kepala Tukang 0.025 OH Rp 157,500.00
4 Mandor 0.025 OH Rp 210,000.00
TOTAL HARGA

L.5 1 TTK Pek. Instalasi Saklar Double


Matrial / Bahan
1 Saklar Double Brocco 1.00 bh Rp 65,625.00
2 T DOS 1.00 bh Rp 3,150.00
Upah
1 Kenek 0.1 OH Rp 115,500.00
2 Tukang 0.05 OH Rp 147,000.00
3 Kepala Tukang 0.025 OH Rp 157,500.00
4 Mandor 0.025 OH Rp 210,000.00
TOTAL HARGA

L.6 1 TTK Pek. Instalasi Stop Kontak AC


Matrial / Bahan
1 Stop Kontak AC Panasonic 1.00 bh Rp 80,850.00
2 T DOS 1.00 bh Rp 3,150.00
Upah
1 Kenek 0.1 OH Rp 115,500.00
2 Tukang 0.05 OH Rp 147,000.00
3 Kepala Tukang 0.025 OH Rp 157,500.00
4 Mandor 0.025 OH Rp 210,000.00
TOTAL HARGA

L.7 1 TTK Pek. Instalasi Box MCB 2 Group


Matrial / Bahan
1 Box MCB 2 Group 1.00 bh Rp 80,850.00
Upah
1 Kenek 0.1 OH Rp 115,500.00
2 Tukang 0.05 OH Rp 147,000.00
3 Kepala Tukang 0.025 OH Rp 157,500.00
4 Mandor 0.025 OH Rp 210,000.00
TOTAL HARGA

L.8 1 TTK Pek. Instalasi Sekring MCB 10A


Matrial / Bahan
1 Sekring Schneider 10A 1.00 bh Rp 86,625.00
Upah
1 Kenek 0.1 OH Rp 115,500.00
2 Tukang 0.05 OH Rp 147,000.00
3 Kepala Tukang 0.025 OH Rp 157,500.00
4 Mandor 0.025 OH Rp 210,000.00
TOTAL HARGA
L.9 1 M1 Pek. Instalasi Kabel 1,5 x 2 mm
Matrial / Bahan
1 Kabel NYM 2x1,5 1.00 roll Rp 567,000.00
Upah
1 Kenek 0.1 OH Rp 115,500.00
2 Tukang 0.05 OH Rp 147,000.00
3 Kepala Tukang 0.025 OH Rp 157,500.00
4 Mandor 0.025 OH Rp 210,000.00
TOTAL HARGA

L.10 1 M1 Pek. Instalasi Kabel 3 x 2,5 mm


Matrial / Bahan
1 Kabel NYM 3x2,5 1.00 roll Rp 766,500.00
Upah
1 Kenek 0.1 OH Rp 115,500.00
2 Tukang 0.05 OH Rp 147,000.00
3 Kepala Tukang 0.025 OH Rp 157,500.00
4 Mandor 0.025 OH Rp 210,000.00
TOTAL HARGA

M. PEKERJAAN SANITAIR

M.1 1 BH Pekerjaan Kloset Duduk


Matrial / Bahan
1 Kloset Duduk 1.00 bh Rp 1,732,500.00
2 Aksesoris 1.00 ls Rp 173,250.00
Upah
1 Kenek 3.3 OH Rp 115,500.00
2 Tukang 1.1 OH Rp 147,000.00
3 Kepala Tukang 0.01 OH Rp 157,500.00
4 Mandor 0.1 OH Rp 210,000.00
TOTAL HARGA

M.2 1 BH Pekerjaan Kloset Jongkok


Matrial / Bahan
1 Kloset Jongkok Toto 1.00 bh Rp 577,500.00
2 Semen PC 50 kg 0.12 sak Rp 52,500.00
3 Pasir Pasang 0.01 m3 Rp 367,500.00
4 Aksesoris 1.00 ls Rp 99,750.00
Upah
1 Kenek 1 OH Rp 115,500.00
2 Tukang 1.5 OH Rp 147,000.00
3 Kepala Tukang 0.15 OH Rp 157,500.00
4 Mandor 0.16 OH Rp 210,000.00
TOTAL HARGA
M.3 1 BH Pekerjaan Wastafel
Matrial / Bahan
1 Wastafel 1.00 bh Rp 735,000.00
2 Semen PC 50 kg 0.12 sak Rp 52,500.00
3 Pasir Pasang 0.01 m3 Rp 367,500.00
4 Aksesoris 1.00 ls Rp 115,500.00
Upah
1 Kenek 1.2 OH Rp 115,500.00
2 Tukang 1.5 OH Rp 147,000.00
3 Kepala Tukang 0.15 OH Rp 157,500.00
4 Mandor 0.1 OH Rp 210,000.00
TOTAL HARGA

M.4 1 BH Pekerjaan Floor Drain


Matrial / Bahan
1 Floor Drain Stainless 1.00 bh Rp 99,750.00
Upah
1 Kenek 0.01 OH Rp 115,500.00
2 Tukang 0.1 OH Rp 147,000.00
3 Kepala Tukang 0.01 OH Rp 157,500.00
4 Mandor 0.005 OH Rp 210,000.00
TOTAL HARGA

M.5 1 BH Pekerjaan Shower


Matrial / Bahan
1 Shower 1.00 bh Rp 131,250.00
Upah
1 Kenek 0.03 OH Rp 115,500.00
2 Tukang 0.3 OH Rp 147,000.00
3 Kepala Tukang 0.03 OH Rp 157,500.00
4 Mandor 0.0015 OH Rp 210,000.00
TOTAL HARGA

M.6 1 BH Pekerjaan Jetwasher


Matrial / Bahan
1 Jetwasher 1.00 bh Rp 99,750.00
Upah
1 Kenek 0.03 OH Rp 115,500.00
2 Tukang 0.3 OH Rp 147,000.00
3 Kepala Tukang 0.03 OH Rp 157,500.00
4 Mandor 0.0015 OH Rp 210,000.00
TOTAL HARGA
M.7 1 BH Pekerjaan Kitchen Sink
Matrial / Bahan
1 Sink Royal 1.00 bh Rp 383,250.00
2 Water Drain + Accesorries 1.00 set Rp 131,250.00
Upah
1 Kenek 0.03 OH Rp 115,500.00
2 Tukang 0.3 OH Rp 147,000.00
3 Kepala Tukang 0.03 OH Rp 157,500.00
4 Mandor 0.0015 OH Rp 210,000.00
TOTAL HARGA

M.8 1 BH Pekerjaan Kran Air


Matrial / Bahan
1 Kran Stainless 1.00 bh Rp 89,250.00
2 Sealtape 0.03 bh Rp 57,750.00
Upah
1 Kenek 0.01 OH Rp 115,500.00
2 Tukang 0.1 OH Rp 147,000.00
3 Kepala Tukang 0.01 OH Rp 157,500.00
4 Mandor 0.005 OH Rp 210,000.00
TOTAL HARGA

M.9 1 M1 Pekerjaan Pipa PVC 1/2" AW


Matrial / Bahan
1 Pipa PVC 1/2" AW 1.00 btg Rp 30,450.00
2 Aksesoris 1.00 ls Rp 3,045.00
Upah
1 Kenek 0.04 OH Rp 115,500.00
2 Tukang 0.06 OH Rp 147,000.00
3 Kepala Tukang 0.006 OH Rp 157,500.00
4 Mandor 0.002 OH Rp 210,000.00
TOTAL HARGA

M.10 1 M1 Pekerjaan Pipa PVC 3/4" AW


Matrial / Bahan
1 Pipa PVC 3/4" 1.00 btg Rp 33,285.00
2 Aksesoris 1.00 ls Rp 3,328.50
Upah
1 Kenek 0.04 OH Rp 115,500.00
2 Tukang 0.06 OH Rp 147,000.00
3 Kepala Tukang 0.006 OH Rp 157,500.00
4 Mandor 0.002 OH Rp 210,000.00
TOTAL HARGA
M.11 1 M1 Pekerjaan Pipa PVC 2" AW
Matrial / Bahan
1 Pipa PVC 2" 1.00 btg Rp 37,800.00
2 Aksesoris 1.00 ls Rp 3,780.00
Upah
1 Kenek 0.04 OH Rp 115,500.00
2 Tukang 0.06 OH Rp 147,000.00
3 Kepala Tukang 0.006 OH Rp 157,500.00
4 Mandor 0.002 OH Rp 210,000.00
TOTAL HARGA

M.12 1 M1 Pekerjaan Pipa PVC 3" AW


Matrial / Bahan
1 Pipa PVC 3" 1.00 btg Rp 111,090.00
2 Aksesoris 1.00 ls Rp 11,109.00
Upah
1 Kenek 0.04 OH Rp 115,500.00
2 Tukang 0.06 OH Rp 147,000.00
3 Kepala Tukang 0.006 OH Rp 157,500.00
4 Mandor 0.002 OH Rp 210,000.00
TOTAL HARGA

M.13 1 M1 Pekerjaan Pipa PVC 4" AW


Matrial / Bahan
1 Pipa PVC 4" D 1.00 btg Rp 147,000.00
2 Aksesoris 1.00 ls Rp 14,700.00
Upah
1 Kenek 0.04 OH Rp 115,500.00
2 Tukang 0.06 OH Rp 147,000.00
3 Kepala Tukang 0.006 OH Rp 157,500.00
4 Mandor 0.002 OH Rp 210,000.00
TOTAL HARGA

M.14 1 BH Pekerjaan Toren Air


Matrial / Bahan
1 Toren air 1000 L 1.00 bh Rp 2,310,000.00
2 Aksesoris 1.00 ls Rp 231,000.00
Upah
1 Kenek 0.4 OH Rp 115,500.00
2 Tukang 0.7 OH Rp 147,000.00
3 Kepala Tukang 0.025 OH Rp 157,500.00
4 Mandor 0.2 OH Rp 210,000.00
TOTAL HARGA

M.14 1 BH Pekerjaan Septictank


Matrial / Bahan
1 Septictank 1.00 ls Rp 4,375,000.00
Upah
1 Kenek 1 OH Rp 115,500.00
2 Tukang 0.5 OH Rp 147,000.00
3 Kepala Tukang 0.1 OH Rp 157,500.00
4 Mandor 0.1 OH Rp 210,000.00
TOTAL HARGA

M.14 1 BH Pekerjaan Meja Dapur


Matrial / Bahan
1 Meja Dapur 1.00 ls Rp 2,315,900.00
Upah
1 Kenek 0.5 OH Rp 115,500.00
2 Tukang 0.2 OH Rp 147,000.00
3 Kepala Tukang 0.1 OH Rp 157,500.00
4 Mandor 0.1 OH Rp 210,000.00
TOTAL HARGA

N. PEKERJAAN LAIN-LAIN

N.1 1 M2 Pekerjaan Kanopi Atap Spandek Pasir


Matrial / Bahan
1 Rangka Baja Ringan + Atap Spandek Pasir 1.00 m2 Rp 315,000.00
Upah
1 Kenek 0.5 OH Rp 115,500.00
2 Tukang 0.05 OH Rp 147,000.00
3 Kepala Tukang 0.025 OH Rp 157,500.00
4 Mandor 0.025 OH Rp 210,000.00
TOTAL HARGA

N.2 1 M2 Pekerjaan Kanopi Atap Spandek Standar


Matrial / Bahan
1 Rangka Baja Ringan + Atap Spandek Standar 1.00 m2 Rp 262,500.00
Upah
1 Kenek 0.5 OH Rp 115,500.00
2 Tukang 0.05 OH Rp 147,000.00
3 Kepala Tukang 0.025 OH Rp 157,500.00
4 Mandor 0.025 OH Rp 210,000.00
TOTAL HARGA

N.3 1 M2 Pekerjaan Kanopi Atap Polycarbonat


Matrial / Bahan
1 Rangka Hollow Galvanis + Atap Polycarbonat 1.00 m2 Rp 525,000.00
Upah
1 Kenek 0.5 OH Rp 115,500.00
2 Tukang 0.05 OH Rp 147,000.00
3 Kepala Tukang 0.025 OH Rp 157,500.00
4 Mandor 0.025 OH Rp 210,000.00
TOTAL HARGA

N.4 1 M2 Pekerjaan Kanopi Atap Solarflat


Matrial / Bahan
1 Rangka Besi Hollow + Atap Solarflat 1,2mm 1.00 m2 Rp 735,000.00
Upah
1 Kenek 0.5 OH Rp 115,500.00
2 Tukang 0.05 OH Rp 147,000.00
3 Kepala Tukang 0.025 OH Rp 157,500.00
4 Mandor 0.025 OH Rp 210,000.00
TOTAL HARGA

N.5 1 M2 Pekerjaan Kanopi Atap Kaca Tempered


Matrial / Bahan
1 Rangka Besi Hollow + Atap Kaca Tempered 8mm 1.00 m2 Rp 1,155,000.00
Upah
1 Kenek 0.5 OH Rp 115,500.00
2 Tukang 0.05 OH Rp 147,000.00
3 Kepala Tukang 0.025 OH Rp 157,500.00
4 Mandor 0.025 OH Rp 210,000.00
TOTAL HARGA
UAN

HARGA BAHAN HARGA UPAH HARGA TOTAL

Rp 5,775.00
Rp 2,940.00
Rp 1,575.00
Rp 2,100.00
Rp - Rp 12,390.00 Rp 12,390.00

Rp 7,875.00
Rp 15,750.00
Rp 840.00

Rp 5,775.00
Rp 1,470.00
Rp 787.50
Rp 1,050.00
Rp 24,465.00 Rp 9,082.50 Rp 33,547.50

Rp 23,100.00
Rp 14,700.00
Rp 1,575.00
Rp 2,100.00
Rp - Rp 41,475.00 Rp 41,475.00

Rp 57,750.00
Rp 36,750.00
Rp 3,937.50
Rp 5,250.00
Rp - Rp 103,687.50 Rp 103,687.50
Rp 5,775.00
Rp 3,675.00
Rp 3,150.00
Rp 4,200.00
Rp - Rp 16,800.00 Rp 16,800.00

Rp 11,550.00
Rp 7,350.00
Rp 3,150.00
Rp 4,200.00
Rp - Rp 26,250.00 Rp 26,250.00

Rp 49,087.50
Rp 14,700.00
Rp 7,875.00
Rp 10,500.00
Rp - Rp 82,162.50 Rp 82,162.50

Rp 5,775.00
Rp 3,675.00
Rp 1,575.00
Rp 2,100.00
Rp - Rp 13,125.00 Rp 13,125.00

Rp 346,500.00

Rp 11,550.00
Rp 14,700.00
Rp 3,150.00
Rp 2,100.00
Rp 346,500.00 Rp 31,500.00 Rp 378,000.00

Rp 189,000.00

Rp 23,100.00
Rp 14,700.00
Rp 3,150.00
Rp 4,200.00
Rp 189,000.00 Rp 45,150.00 Rp 234,150.00

Rp 31,500.00

Rp 5,775.00
Rp 7,350.00
Rp 1,575.00
Rp 2,100.00
Rp 31,500.00 Rp 16,800.00 Rp 48,300.00

Rp 315,000.00
Rp 33,075.00

Rp 57,750.00
Rp 44,100.00
Rp 31,500.00
Rp 21,000.00
Rp 348,075.00 Rp 154,350.00 Rp 502,425.00

Rp 315,000.00
Rp 164,062.50
Rp 137,812.50

Rp 115,500.00
Rp 147,000.00
Rp 31,500.00
Rp 21,000.00
Rp 616,875.00 Rp 315,000.00 Rp 931,875.00

Rp 63,000.00
Rp 5,801.25

Rp 34,650.00
Rp 14,700.00
Rp 3,150.00
Rp 3,150.00
Rp 68,801.25 Rp 55,650.00 Rp 124,451.25

Rp 58,800.00
Rp 9,975.00
Rp 14,700.00

Rp 40,425.00
Rp 14,700.00
Rp 1,575.00
Rp 3,150.00
Rp 83,475.00 Rp 59,850.00 Rp 143,325.00

Rp 525,000.00
Rp 11,550.00
Rp 12,862.50

Rp 34,650.00
Rp 14,700.00
Rp 1,575.00
Rp 3,150.00
Rp 549,412.50 Rp 54,075.00 Rp 603,487.50

Rp 364,583.33
Rp 183,750.00
Rp 134,750.00
Rp 1,730,555.56
Rp 27,562.50
Rp 420.00
Rp 115,500.00
Rp 147,000.00
Rp 31,500.00
Rp 21,000.00
Rp 2,441,621.39 Rp 315,000.00 Rp 2,756,621.39

Rp 364,583.33
Rp 183,750.00
Rp 134,750.00
Rp 88,200.00
Rp 1,802,500.00
Rp 1,400,000.00
Rp 893,229.17
Rp 2,041,666.67
Rp 61,250.00

Rp 288,750.00
Rp 837,900.00
Rp 157,500.00
Rp 210,000.00
Rp 6,969,929.17 Rp 1,494,150.00 Rp 8,464,079.17

Rp 364,583.33
Rp 183,750.00
Rp 134,750.00
Rp 67,336.89
Rp 1,442,000.00
Rp 995,555.56
Rp 816,666.67
Rp 1,726,666.67
Rp 52,266.67

Rp 288,750.00
Rp 837,900.00
Rp 157,500.00
Rp 210,000.00
Rp 5,783,575.78 Rp 1,494,150.00 Rp 7,277,725.78

Rp 364,583.33
Rp 183,750.00
Rp 134,750.00
Rp 70,342.22
Rp 1,602,222.22
Rp 933,333.33
Rp 765,625.00
Rp 1,516,666.67
Rp 46,277.78

Rp 288,750.00
Rp 837,900.00
Rp 157,500.00
Rp 210,000.00
Rp 5,617,550.56 Rp 1,494,150.00 Rp 7,111,700.56

Rp 364,583.33
Rp 183,750.00
Rp 134,750.00
Rp 78,400.00
Rp 1,602,222.22
Rp 1,244,444.44
Rp 1,020,833.33
Rp 2,333,333.33
Rp 70,000.00

Rp 288,750.00
Rp 837,900.00
Rp 157,500.00
Rp 210,000.00
Rp 7,032,316.67 Rp 1,494,150.00 Rp 8,526,466.67

Rp 364,583.33
Rp 183,750.00
Rp 134,750.00
Rp 80,142.22
Rp 1,802,500.00
Rp 1,088,888.89
Rp 893,229.17
Rp 1,808,333.33
Rp 55,027.78

Rp 288,750.00
Rp 837,900.00
Rp 157,500.00
Rp 210,000.00
Rp 6,411,204.72 Rp 1,494,150.00 Rp 7,905,354.72
Rp 364,583.33
Rp 183,750.00
Rp 134,750.00
Rp 67,336.89
Rp 1,442,000.00
Rp 995,555.56
Rp 816,666.67
Rp 1,493,333.33
Rp 46,044.44

Rp 288,750.00
Rp 837,900.00
Rp 157,500.00
Rp 210,000.00
Rp 5,544,020.22 Rp 1,494,150.00 Rp 7,038,170.22

Rp 364,583.33
Rp 183,750.00
Rp 134,750.00
Rp 70,342.22
Rp 1,602,222.22
Rp 933,333.33
Rp 765,625.00
Rp 1,283,333.33
Rp 40,055.56

Rp 288,750.00
Rp 837,900.00
Rp 157,500.00
Rp 210,000.00
Rp 5,377,995.00 Rp 1,494,150.00 Rp 6,872,145.00

Rp 364,583.33
Rp 183,750.00
Rp 134,750.00
Rp 56,785.56
Rp 1,201,666.67
Rp 855,555.56
Rp 701,822.92
Rp 1,020,833.33
Rp 32,569.44
Rp 288,750.00
Rp 837,900.00
Rp 157,500.00
Rp 210,000.00
Rp 4,552,316.81 Rp 1,494,150.00 Rp 6,046,466.81

Rp 364,583.33
Rp 183,750.00
Rp 20.00
Rp 78,400.00
Rp 1,602,222.22
Rp 1,244,444.44
Rp 1,020,833.33
Rp 2,566,666.67
Rp 76,222.22

Rp 288,750.00
Rp 837,900.00
Rp 157,500.00
Rp 210,000.00
Rp 7,137,142.22 Rp 1,494,150.00 Rp 8,631,292.22

Rp 364,583.33
Rp 183,750.00
Rp 134,750.00
Rp 80,142.22
Rp 1,802,500.00
Rp 1,088,888.89
Rp 893,229.17
Rp 2,041,666.67
Rp 61,250.00

Rp 288,750.00
Rp 837,900.00
Rp 157,500.00
Rp 210,000.00
Rp 6,650,760.28 Rp 1,494,150.00 Rp 8,144,910.28

Rp 364,583.33
Rp 183,750.00
Rp 134,750.00
Rp 70,342.22
Rp 1,602,222.22
Rp 933,333.33
Rp 765,625.00
Rp 1,516,666.67
Rp 46,277.78

Rp 288,750.00
Rp 837,900.00
Rp 157,500.00
Rp 210,000.00
Rp 5,617,550.56 Rp 1,494,150.00 Rp 7,111,700.56

Rp 364,583.33
Rp 183,750.00
Rp 134,750.00
Rp 56,785.56
Rp 1,201,666.67
Rp 855,555.56
Rp 701,822.92
Rp 1,254,166.67
Rp 38,791.67

Rp 288,750.00
Rp 837,900.00
Rp 157,500.00
Rp 210,000.00
Rp 4,791,872.36 Rp 1,494,150.00 Rp 6,286,022.36

Rp 364,583.33
Rp 183,750.00
Rp 134,750.00
Rp 982,800.00
Rp 980,000.00
Rp 350,000.00
Rp 68,250.00

Rp 288,750.00
Rp 837,900.00
Rp 157,500.00
Rp 210,000.00
Rp 3,064,133.33 Rp 1,494,150.00 Rp 4,558,283.33
Rp 364,583.33
Rp 183,750.00
Rp 134,750.00
Rp 83,527.50
Rp 903,000.00
Rp 382,812.50
Rp 525,000.00

Rp 288,750.00
Rp 837,900.00
Rp 157,500.00
Rp 210,000.00
Rp 2,577,423.33 Rp 1,494,150.00 Rp 4,071,573.33

Rp 364,583.33
Rp 183,750.00
Rp 134,750.00
Rp 138,173.62
Rp 1,493,768.89
Rp 661,500.00
Rp 26,460.00

Rp 288,750.00
Rp 837,900.00
Rp 157,500.00
Rp 210,000.00
Rp 3,002,985.84 Rp 1,494,150.00 Rp 4,497,135.84

Rp 7,291.67
Rp 6,125.00

Rp 28,875.00
Rp 22,050.00
Rp 7,875.00
Rp 10,500.00
Rp 13,416.67 Rp 69,300.00 Rp 82,716.67

Rp 4,536.00
Rp 2,205.00

Rp 28,875.00
Rp 22,050.00
Rp 7,875.00
Rp 10,500.00
Rp 6,741.00 Rp 69,300.00 Rp 76,041.00

Rp 3,412.50

Rp 23,100.00
Rp 14,700.00
Rp 1,575.00
Rp 2,100.00
Rp 3,412.50 Rp 41,475.00 Rp 44,887.50

Rp 41,666.67
Rp 27,343.75
Rp 18,375.00
Rp 15,159.38

Rp 231,000.00
Rp 147,000.00
Rp 15,750.00
Rp 21,000.00
Rp 102,544.79 Rp 414,750.00 Rp 517,294.79

Rp 41,666.67
Rp 27,343.75
Rp 18,375.00
Rp 15,159.38

Rp 231,000.00
Rp 147,000.00
Rp 15,750.00
Rp 21,000.00
Rp 102,544.79 Rp 414,750.00 Rp 517,294.79
Rp 121,275.00
Rp 13,671.88
Rp 16,078.13
Rp 3,465.00

Rp 17,325.00
Rp 14,700.00
Rp 7,875.00
Rp 10,500.00
Rp 154,490.00 Rp 50,400.00 Rp 204,890.00

Rp 98,175.00
Rp 13,671.88
Rp 16,078.13
Rp 3,465.00

Rp 17,325.00
Rp 14,700.00
Rp 7,875.00
Rp 10,500.00
Rp 131,390.00 Rp 50,400.00 Rp 181,790.00

Rp 98,175.00
Rp 13,671.88
Rp 16,078.13
Rp 3,465.00

Rp 17,325.00
Rp 14,700.00
Rp 7,875.00
Rp 10,500.00
Rp 131,390.00 Rp 50,400.00 Rp 181,790.00

Rp 254,100.00
Rp 18,229.17
Rp 15,312.50
Rp 3,465.00

Rp 28,875.00
Rp 18,375.00
Rp 2,047.50
Rp 2,730.00
Rp 291,106.67 Rp 52,027.50 Rp 343,134.17

Rp 277,200.00
Rp 3,360.00

Rp 11,550.00
Rp 7,350.00
Rp 1,575.00
Rp 2,100.00
Rp 280,560.00 Rp 22,575.00 Rp 303,135.00

Rp 4,937,625.00

Rp 92,400.00
Rp 73,500.00
Rp 1,575.00
Rp 2,100.00
Rp 4,937,625.00 Rp 169,575.00 Rp 5,107,200.00

Rp 2,281,125.00

Rp 92,400.00
Rp 73,500.00
Rp 1,575.00
Rp 2,100.00
Rp 2,281,125.00 Rp 169,575.00 Rp 2,450,700.00

Rp 1,968,750.00

Rp 57,750.00
Rp 73,500.00
Rp 3,937.50
Rp 5,250.00
Rp 1,968,750.00 Rp 140,437.50 Rp 2,109,187.50
Rp 3,609,375.00

Rp 115,500.00
Rp 7,350.00
Rp 3,937.50
Rp 5,250.00
Rp 3,609,375.00 Rp 132,037.50 Rp 3,741,412.50

Rp 5,250,000.00

Rp 115,500.00
Rp 7,350.00
Rp 3,937.50
Rp 5,250.00
Rp 5,250,000.00 Rp 132,037.50 Rp 5,382,037.50

Rp 6,890,100.00

Rp 115,500.00
Rp 7,350.00
Rp 3,937.50
Rp 5,250.00
Rp 6,890,100.00 Rp 132,037.50 Rp 7,022,137.50

Rp 1,812,298.95

Rp 115,500.00
Rp 7,350.00
Rp 3,937.50
Rp 5,250.00
Rp 1,812,298.95 Rp 132,037.50 Rp 1,944,336.45

Rp 1,629,600.00

Rp 115,500.00
Rp 7,350.00
Rp 3,937.50
Rp 5,250.00
Rp 1,629,600.00 Rp 132,037.50 Rp 1,761,637.50
Rp 553,350.00

Rp 1,155.00
Rp 1,470.00
Rp 1,575.00
Rp 2,100.00
Rp 553,350.00 Rp 6,300.00 Rp 559,650.00

Rp 1,916,250.00

Rp 1,155.00
Rp 1,470.00
Rp 1,575.00
Rp 2,100.00
Rp 1,916,250.00 Rp 6,300.00 Rp 1,922,550.00

Rp 765,000.00

Rp 1,155.00
Rp 1,470.00
Rp 1,575.00
Rp 2,100.00
Rp 765,000.00 Rp 6,300.00 Rp 771,300.00

Rp 126,000.00
Rp 32,812.50
Rp 5,250.00

Rp 23,100.00
Rp 14,700.00
Rp 7,875.00
Rp 10,500.00
Rp 164,062.50 Rp 56,175.00 Rp 220,237.50
Rp 56,175.00
Rp 65,100.00
Rp 18,375.00

Rp 23,100.00
Rp 14,700.00
Rp 1,575.00
Rp 2,100.00
Rp 139,650.00 Rp 41,475.00 Rp 181,125.00

Rp 106,707.32
Rp 5,250.00

Rp 23,100.00
Rp 14,700.00
Rp 1,575.00
Rp 2,100.00
Rp 111,957.32 Rp 41,475.00 Rp 153,432.32

Rp 138,600.00
Rp 17,850.00

Rp 11,550.00
Rp 7,350.00
Rp 4,725.00
Rp 4,200.00
Rp 156,450.00 Rp 27,825.00 Rp 184,275.00

Rp 84,000.00

Rp 13,860.00
Rp 8,820.00
Rp 1,575.00
Rp 2,100.00
Rp 84,000.00 Rp 26,355.00 Rp 110,355.00
Rp 21,000.00
Rp 31,500.00
Rp 29,811.60
Rp 2,021.25
Rp 9,843.75

Rp 23,100.00
Rp 14,700.00
Rp 3,150.00
Rp 4,200.00
Rp 94,176.60 Rp 45,150.00 Rp 139,326.60

Rp 31,500.00
Rp 34,398.00
Rp 2,887.50
Rp 9,843.75
Rp 9,843.75

Rp 23,100.00
Rp 22,050.00
Rp 5,512.50
Rp 3,780.00
Rp 88,473.00 Rp 54,442.50 Rp 142,915.50

Rp 175,350.00

Rp 5,775.00
Rp 1,470.00
Rp 1,575.00
Rp 2,100.00
Rp 175,350.00 Rp 10,920.00 Rp 186,270.00

Rp 33,075.00
Rp 11,812.50

Rp 9,240.00
Rp 7,350.00
Rp 1,575.00
Rp 2,100.00
Rp 44,887.50 Rp 20,265.00 Rp 65,152.50

Rp -
Rp 9,450.00

Rp 11,550.00
Rp 7,350.00
Rp 1,575.00
Rp 2,100.00
Rp 9,450.00 Rp 22,575.00 Rp 32,025.00

Rp 1,890.00
Rp 3,360.00
Rp 9,828.00
Rp 1,575.00

Rp 5,775.00
Rp 7,350.00
Rp 1,102.50
Rp 1,470.00
Rp 16,653.00 Rp 15,697.50 Rp 32,350.50

Rp 1,890.00
Rp 3,360.00
Rp 9,828.00
Rp 3,150.00

Rp 11,550.00
Rp 7,350.00
Rp 1,575.00
Rp 2,100.00
Rp 18,228.00 Rp 22,575.00 Rp 40,803.00

Rp 240.00
Rp 42,000.00
Rp 3,150.00
Rp -
Rp 7,350.00
Rp 1,575.00
Rp 2,100.00
Rp -
Rp 45,390.00 Rp 11,025.00 Rp 56,415.00

Rp 121,485.00
Rp 3,150.00

Rp 11,550.00
Rp 7,350.00
Rp 3,937.50
Rp 5,250.00
Rp 124,635.00 Rp 28,087.50 Rp 152,722.50

Rp 81,375.00
Rp 3,150.00

Rp 11,550.00
Rp 7,350.00
Rp 3,937.50
Rp 5,250.00
Rp 84,525.00 Rp 28,087.50 Rp 112,612.50

Rp 56,175.00
Rp 3,150.00

Rp 11,550.00
Rp 7,350.00
Rp 3,937.50
Rp 5,250.00
Rp 59,325.00 Rp 28,087.50 Rp 87,412.50

Rp 55,125.00
Rp 3,150.00
Rp 11,550.00
Rp 7,350.00
Rp 3,937.50
Rp 5,250.00
Rp 58,275.00 Rp 28,087.50 Rp 86,362.50

Rp 65,625.00
Rp 3,150.00

Rp 11,550.00
Rp 7,350.00
Rp 3,937.50
Rp 5,250.00
Rp 68,775.00 Rp 28,087.50 Rp 96,862.50

Rp 80,850.00
Rp 3,150.00

Rp 11,550.00
Rp 7,350.00
Rp 3,937.50
Rp 5,250.00
Rp 84,000.00 Rp 28,087.50 Rp 112,087.50

Rp 80,850.00

Rp 11,550.00
Rp 7,350.00
Rp 3,937.50
Rp 5,250.00
Rp 80,850.00 Rp 28,087.50 Rp 108,937.50

Rp 86,625.00

Rp 11,550.00
Rp 7,350.00
Rp 3,937.50
Rp 5,250.00
Rp 86,625.00 Rp 28,087.50 Rp 114,712.50
Rp 567,000.00

Rp 11,550.00
Rp 7,350.00
Rp 3,937.50
Rp 5,250.00
Rp 567,000.00 Rp 28,087.50 Rp 595,087.50

Rp 766,500.00

Rp 11,550.00
Rp 7,350.00
Rp 3,937.50
Rp 5,250.00
Rp 766,500.00 Rp 28,087.50 Rp 794,587.50

Rp 1,732,500.00
Rp 173,250.00

Rp 381,150.00
Rp 161,700.00
Rp 1,575.00
Rp 21,000.00
Rp 1,905,750.00 Rp 565,425.00 Rp 2,471,175.00

Rp 577,500.00
Rp 6,300.00
Rp 3,675.00
Rp 99,750.00

Rp 115,500.00
Rp 220,500.00
Rp 23,625.00
Rp 33,600.00
Rp 687,225.00 Rp 393,225.00 Rp 1,080,450.00
Rp 735,000.00
Rp 6,300.00
Rp 3,675.00
Rp 115,500.00

Rp 138,600.00
Rp 220,500.00
Rp 23,625.00
Rp 21,000.00
Rp 860,475.00 Rp 403,725.00 Rp 1,264,200.00

Rp 99,750.00

Rp 1,155.00
Rp 14,700.00
Rp 1,575.00
Rp 1,050.00
Rp 99,750.00 Rp 18,480.00 Rp 118,230.00

Rp 131,250.00

Rp 3,465.00
Rp 44,100.00
Rp 4,725.00
Rp 315.00
Rp 131,250.00 Rp 52,605.00 Rp 183,855.00

Rp 99,750.00

Rp 3,465.00
Rp 44,100.00
Rp 4,725.00
Rp 315.00
Rp 99,750.00 Rp 52,605.00 Rp 152,355.00
Rp 383,250.00
Rp 131,250.00

Rp 3,465.00
Rp 44,100.00
Rp 4,725.00
Rp 315.00
Rp 514,500.00 Rp 52,605.00 Rp 567,105.00

Rp 89,250.00
Rp 1,443.75

Rp 1,155.00
Rp 14,700.00
Rp 1,575.00
Rp 1,050.00
Rp 90,693.75 Rp 18,480.00 Rp 109,173.75

Rp 30,450.00
Rp 3,045.00

Rp 4,620.00
Rp 8,820.00
Rp 945.00
Rp 420.00
Rp 33,495.00 Rp 14,805.00 Rp 48,300.00

Rp 33,285.00
Rp 3,328.50

Rp 4,620.00
Rp 8,820.00
Rp 945.00
Rp 420.00
Rp 36,613.50 Rp 14,805.00 Rp 51,418.50
Rp 37,800.00
Rp 3,780.00

Rp 4,620.00
Rp 8,820.00
Rp 945.00
Rp 420.00
Rp 41,580.00 Rp 14,805.00 Rp 56,385.00

Rp 111,090.00
Rp 11,109.00

Rp 4,620.00
Rp 8,820.00
Rp 945.00
Rp 420.00
Rp 122,199.00 Rp 14,805.00 Rp 137,004.00

Rp 147,000.00
Rp 14,700.00

Rp 4,620.00
Rp 8,820.00
Rp 945.00
Rp 420.00
Rp 161,700.00 Rp 14,805.00 Rp 176,505.00

Rp 2,310,000.00
Rp 231,000.00

Rp 46,200.00
Rp 102,900.00
Rp 3,937.50
Rp 42,000.00
Rp 2,541,000.00 Rp 195,037.50 Rp 2,736,037.50
Rp 4,375,000.00

Rp 115,500.00
Rp 73,500.00
Rp 15,750.00
Rp 21,000.00
Rp 4,375,000.00 Rp 225,750.00 Rp 4,600,750.00

Rp 2,315,900.00

Rp 57,750.00
Rp 29,400.00
Rp 15,750.00
Rp 21,000.00
Rp 2,315,900.00 Rp 123,900.00 Rp 2,439,800.00

Rp 315,000.00

Rp 57,750.00
Rp 7,350.00
Rp 3,937.50
Rp 5,250.00
Rp 315,000.00 Rp 74,287.50 Rp 389,287.50

Rp 262,500.00

Rp 57,750.00
Rp 7,350.00
Rp 3,937.50
Rp 5,250.00
Rp 262,500.00 Rp 74,287.50 Rp 336,787.50

Rp 525,000.00

Rp 57,750.00
Rp 7,350.00
Rp 3,937.50
Rp 5,250.00
Rp 525,000.00 Rp 74,287.50 Rp 599,287.50

Rp 735,000.00

Rp 57,750.00
Rp 7,350.00
Rp 3,937.50
Rp 5,250.00
Rp 735,000.00 Rp 74,287.50 Rp 809,287.50

Rp 1,155,000.00

Rp 57,750.00
Rp 7,350.00
Rp 3,937.50
Rp 5,250.00
Rp 1,155,000.00 Rp 74,287.50 Rp 1,229,287.50
RENCANA ANGGARAN BIAYA
PEMBANGUNAN TOKO BANYUMANIK

Project : Banyumanik
Lokasi : Jalan Jati Raya, Jawa Tengah

HARGA SATUAN JUMLAH HARGA


NO. URAIAN PEKERJAAN + MATERIAL VOL. SAT.
(Rupiah) (Rupiah)

A PEKERJAAN PERSIAPAN
1 Pembongkaran Dinding 68.90 m2 75,000.00 5,167,650.00
2 Pembongkaran Plafond 201.24 m2 45,000.00 9,055,800.00
3 Pembongkaran Atap dan Rangka Atap 179.98 m2 120,000.00 21,597,792.59
4 Pembongkaran Dak Lt.2 9.15 m3 120,000.00 1,097,460.00
5 Pembongkaran Kolom 3.45 m3 120,000.00 414,180.00
6 Pembongkaran Folding Gate 2.00 ls 1,000,000.00 2,000,000.00
7 Mob/Demob 1.00 ls 5,000,000.00 5,000,000.00
8 Pagar Proyek Sementara 1.00 ls 1,500,000.00 1,500,000.00
SUB-TOTAL 45,832,882.59

B PEKERJAAN URUGAN DAN GALIAN


1 Pekerjaan Galian Tanah Pondasi Batu Kali 24.35 m3 95,000.00 2,313,630.00
2 Pekerjaan Urug Tanah Kembali Pondasi Batu Kali 14.65 m3 65,000.00 952,458.00
3 Pasir Urug Pondasi Batu Kali t=10cm 4.06 m3 795,000.00 3,226,905.00
4 Lantai Kerja Pondasi Batu Kali t=5cm 2.03 m3 500,000.00 1,014,750.00
5 Pengurugan Puing Asumsi 50% 114.94 m3 75,000.00 8,620,425.00
6 Pemadatan Puing 230.41 m3 25,000.00 5,760,250.00
7 Pasir Urug Lantai t=10cm 23.04 m3 795,000.00 18,317,595.00
8 Pekerjaan Galian Pondasi Foot Plat 5.40 m3 95,000.00 513,000.00
9 Pekerjaan Urug Tanah Kembali Pondasi Foot Plat 5.29 m3 65,000.00 343,980.00
10 Pasir Urug Pondasi Foot Plat t=10cm 0.54 m3 795,000.00 429,300.00
11 Lantai Kerja Pondasi Foot Plat t=5cm 0.27 m3 500,000.00 135,000.00
SUB-TOTAL 41,627,293.00

C PEKERJAAN PASANGAN
1 Pemasangan Batu Kosong (Anstamping) t=20cm 4.85 m3 550,000.00 2,667,720.00
2 Pemasangan Pondasi Batu Kali t=40cm 4.85 m3 1,350,000.00 6,548,040.00
3 Pemasangan Bata Ringan/Hebel Lt.1 & Lt.2 tbl=10cm 229.63 m2 145,000.00 33,296,531.25
4 Pemasangan Pintu Existing 3.00 pcs 300,000.00 900,000.00
5 Pemasangan Jendela Existing 3.00 pcs 300,000.00 900,000.00
SUB-TOTAL 44,312,291.25

D PEKERJAAN BETON
1 Pemasangan Pondasi Foot Plat 60x60x20 0.27 m3 6,000,000.00 1,620,000.00
2 Sloof Beton Bertulang 15x20 1.94 m3 6,000,000.00 11,626,200.00
3 Kolom Beton Bertulang 35x45 (K1) 2.68 m3 6,000,000.00 16,065,000.00
4 Kolom Beton Bertulang 15x20 (K2) 0.51 m3 6,000,000.00 3,060,000.00
5 kolom Beton Bertulang 20x30 (K3) 1.28 m3 6,000,000.00 7,650,000.00
6 Kolom Praktis Beton Bertulang 15x15 Lt.1 (KP) 0.67 m3 3,500,000.00 2,342,812.50
7 Kolom Praktis Beton Bertulang 15x15 Lt.2 (KP) 0.68 m3 3,500,000.00 2,362,500.00
8 Balok Beton Bertulang 35x75 (B1) 4.62 m3 6,000,000.00 27,720,000.00
9 Balok Beton Bertulang 15x25 (B2) 0.33 m3 6,000,000.00 1,980,000.00
10 Balok Beton Bertulang 15x20 (B3) 0.38 m3 6,000,000.00 2,257,200.00
11 Balok Beton Bertulang 20x40 (B4) 1.41 m3 6,000,000.00 8,448,000.00
12 Balok Anak Beton Bertulang 15x30 (BA) 1.24 m3 6,000,000.00 7,419,600.00
13 Ring Balok Beton Bertulang 15x15 (RB) 1.22 m3 6,000,000.00 7,349,400.00
14 Pekerjaan Tangga Beton 0.70 m3 6,000,000.00 4,186,800.00
15 Pekerjaan Dak beton lt.2 tbl=12cm 5.84 m3 6,000,000.00 35,035,200.00
16 Dak Talang/Kanopi Beton tbl=10 cm, l=60cm, t=30cm 1.56 m3 4,500,000.00 7,020,000.00
SUB-TOTAL 146,142,712.50
E PEKERJAAN PLESTERAN
1 Plester Dinding 459.26 m2 55,000.00 25,259,437.50
2 Acian Dinding 459.26 m2 45,000.00 20,666,812.50
SUB-TOTAL 45,926,250.00

F PEKERJAAN LANTAI DAN PELAPIS DINDING


1 Pekerjaan Screed Carport tbl=10cm 64.46 m2 225,000.00 14,503,500.00
2 Pekerjaan Lantai keramik 40x40 (Sales+Teras) Merk Roman 161.57 m2 245,000.00 39,584,650.00
3 Pekerjaan Lantai Keramik 30x30 (Mess,Gudang, Musholla) Merk Mulia 56.07 m3 145,000.00 8,130,150.00
4 Pekerjaan Lantai keramik 20x20 (Toilet) 29.90 m2 135,000.00 4,036,500.00
SUB-TOTAL 66,254,800.00

G PEKERJAAN KUSEN, DAUN PINTU, DAN JENDELA


1 Pemasangan Folding Gate 2 unit t=3m 24.60 m2 700,000.00 17,220,000.00
2 Pemasangan Pintu Kaca 10mm Komplit t=2,8m 1.00 unit 8,500,000.00 8,500,000.00
3 Pemasangan Kaca Framess 10mm t-2,8m 17.50 m2 750,000.00 13,125,000.00
SUB-TOTAL 38,845,000.00

H PEKERJAAN RAILLING & PARTISI


1 Pekerjaan Railling Hollow Galvanis 40x40x1,2 + Pengecatan 6.40 m1 650,000.00 4,160,000.00
SUB-TOTAL 4,160,000.00

I PEKERJAAN RANGKA DAN PENUTUP ATAP


1 Rangka Atap Baja Ringan tbl=0,75 + Penutup Atap Spandek tbl=0,35 167.66 m2 265,000.00 44,429,900.00
2 Kanopi Hollow + Penutup Atap Spandek tbl=0,35 13.20 m2 450,000.00 5,940,000.00
3 Pemasangan Dinding Sopi-Sopi 55.30 m2 155,000.00 8,571,500.00
4 Plester + Aci Dinding Sopi-Sopi 110.60 m2 100,000.00 11,060,000.00
5 Flasing Tepi Tembok Area Samping 33.00 m1 135,000.00 4,455,000.00
6 Pekerjaan Nok Penutup Atap 12.15 m1 45,000.00 546,750.00
SUB-TOTAL 75,003,150.00

J PEKERJAAN PLAFOND
1 Pekerjaan Plafond Gypsum + Rangka Hollow 9mm 219.64 m2 150,000.00 32,946,000.00
2 Pekerjaan List plafond gypsum 86.10 m1 25,000.00 2,152,500.00
SUB-TOTAL 35,098,500.00

K PEKERJAAN PENGECATAN
1 Pengecatan Dinding Interior 459.26 m2 40,000.00 18,370,500.00
2 Pengecatan Dinding Eksterior 276.72 m2 50,000.00 13,836,000.00
3 Pengecatan Waterproofing Dak Talang 15.60 m2 50,000.00 780,000.00
4 Pengecatan Plafond Gypsum 219.64 m2 40,000.00 8,785,600.00
5 Pengecatan Folding Gate 24.60 m2 50,000.00 1,230,000.00
SUB-TOTAL 43,002,100.00

L PEKERJAAN SANITASI
1 Pekerjaan Roofdrain 2.00 pcs 155,000.00 310,000.00
2 Pekerjaan Instalasi Air Bekas 3" + Sambungan 41.00 m1 185,000.00 7,585,000.00
3 Pekerjaan Instalasi Air Kotor 4" + Sambungan 6.50 m1 135,000.00 877,500.00
4 CNP 100 Area Kanopi 8.80 m1 150,000.00 1,320,000.00
4 Pekerjaan CO 4" 2.00 pcs 850,000.00 1,700,000.00
5 Pekerjaan Septictank 1.00 ls 7,000,000.00 7,000,000.00
6 Pemasangan Zink Cuci Piring 1.00 pcs 300,000.00 300,000.00
7 Pemasangan Kran Leher Angsa Untuk Zink 1.00 pcs 125,000.00 125,000.00
SUB-TOTAL 19,217,500.00
M PEKERJAAN LAIN-LAIN
1 Pembersihan Lahan 1.00 ls 2,500,000.00 2,500,000.00
SUB-TOTAL 2,500,000.00

GRAND TOTAL 607,922,479.34


Item Pekerjaan Vol
Pekerjaan Persiapan P L T
Pembongkaran Dinding 19.32 19.07 2.6
Pembongkaran Plafond 201.24 -
Pembongkaran Atap dan Rangka Atap 180 -
Pembongkaran Folding Gate 2 -
Pembongkaran Dak Lt.2 60.97 0.15
Pembongkaran Kolom 3.4515 2.6
Mob/Demob 1 -
Pagar Proyek Sementara 1 -

Pekerjaan Urugan dan Galian


Pekerjaan Galian Tanah Pondasi Batu Kali 40.59 0.6 1
Pekerjaan Urug Tanah Kembali Pondasi Batu Kali
Pasir Urug Pondasi Batu Kali t=10cm 40.59 0.1
Lantai Kerja Pondasi Batu Kali t=5cm 40.59 0.05
Pengurugan Puing Asumsi 50% 171.38 1.05
Pemadatan Puing 230.41 -
Pasir Urug Lantai t=10cm 230.41 0.1
Pekerjaan Galian Pondasi Foot Plat 0.6 0.6 1
Pekerjaan Urug Tanah Kembali Pondasi Foot Plat 0.6 0.6 0.3
Pasir Urug Pondasi Foot Plat t=10cm 0.6 0.6 0.1
Lantai Kerja Pondasi Foot Plat t=5cm 0.6 0.6 0.05

Pekerjaan Pasangan
Pemasangan Batu Kosong (Anstamping) t=20cm 40.42 0.6 0.2
Pemasangan Pondasi Batu Kali t=40cm 40.42 0.6 0.4
Pemasangan Bata Ringan/Hebel Lt.1 & Lt.2 tbl=10cm 229.63 -
Pemasangan Pondasi Foot Plat 60x60x20 0.6 0.6 0.2
Pemasangan Pintu Existing 3

Pekerjaan Beton
Sloof Beton Bertulang 15x20 0.15 0.2 64.59
Kolom Beton Bertulang 35x45 (K1) 0.35 0.45 4.25
Kolom Beton Bertulang 15x20 (K2) 0.15 0.2 4.25
kolom Beton Bertulang 20x30 (K3) 0.2 0.3 4.25
Kolom Praktis Beton Bertulang 15x15 Lt.1 (KP) 0.15 0.15 4.25
Kolom Praktis Beton Bertulang 15x15 Lt.2 (KP) 0.15 0.15 3
Balok Beton Bertulang 35x75 (B1) 0.35 0.75 17.6
Balok Beton Bertulang 15x25 (B2) 0.15 0.25 8.8
Balok Beton Bertulang 15x20 (B3) 0.15 0.2 12.54
Balok Beton Bertulang 20x40 (B4) 0.2 0.4 17.6
Balok Anak Beton Bertulang 15x30 (BA) 0.15 0.3 27.48
Ring Balok Beton Bertulang 15x15 (RB) 0.15 0.15 54.44
Pekerjaan Tangga Beton 0.6978 -
Pekerjaan Dak beton lt.2 tbl=12cm 48.66 0.12
Dak Talang/Kanopi Beton tbl=10 cm, l=60cm, t=30cm 15.6 0.1

Pekerjaan Plesteran
Plester Dinding - - -
Acian Dinding - - -

Pekerjaan Lantai dan Pelapis Dinding


Pekerjaan Screed Carport tbl=10cm 64.46 -
Pekerjaan Lantai keramik 40x40 (Sales+Teras) Merk Roman 161.57 -
Pekerjaan Lantai keramik 20x20 (Toilet) 29.9 -
Pekerjaan Lantai Keramik 30x30 (Mess,Gudang, Musholla) Merk Mulia 56.07 -
-
-
-

Pekerjaan Rangka dan Penutup Atap


Rangka Atap Baja Ringan tbl=0,75 + Penutup Atap Spandek tbl=0,35 167.66 -
Kanopi Hollow + Penutup Atap Spandek tbl=0,35 13.2 -
Pemasangan Dinding Sopi-Sopi 55.3 -
Plester + Aci Dinding Sopi-Sopi
CNP 100 Area Kanopi 8.8
Flasing Tepi Tembok Area Samping 33 -

Pekerjaan Plafond
Pekerjaan Plafond Gypsum + Rangka Hollow 9mm 219.64 -
Pekerjaan List plafond gypsum 86.1 -

Pekerjaan Pengecatan
Pengecatan Dinding Interior 459.2625 -
Pengecatan Dinding Eksterior 92.24 3
Pengecatan Waterproofing Dak Talang 15.6 -
Pengecatan Plafond Gypsum 219.64 -
Pengecatan Folding Gate 8.2 3

Pekerjaan Eksterior
Pemasangan Folding Gate 2 unit t=3m 8.2 3
Pemasangan Pintu Kaca 10mm Komplit t=2,8m 1 -
Pemasangan Kaca Framess 10mm t-2,8m 7 2.5

f
Vol
Titik Total
- 68.902 Pembongkaran dak
- 201.24 Pembongkran kolom
- 180
- 2
- 9.1455
3.4515 Kolom 0.25 0.3 2.6 10 1.95
- 1 0.15 0.2 2.6 2 0.156
- 1 0.15 0.15 2.6 23 1.3455
Total 466.7206

- 24.354
- 14.6532
- 4.059
- 2.0295
- 114.939 49.929
- 230.41
- 23.041
15 5.4
- 5.292
15 0.54
15 0.27
Total 390.4447

- 4.8504
- 4.8504 p t
- 229.63125 Dinding area lantai 2 exxting 27.24 1.65 44.946
15 1.08 Dinding area lantai 1 exxting 12.145 2.45 29.75525
3 Dinding baru lt.1 8.84 4.25 37.57
Total 243.41205 Dinding baru lt.2 39.12 3 117.36
Dinding Sopi-Sopi Lt.1 18.2 2 36.4
Dinding Sopi-Sopi Lt.2 12.6 1.5 18.9
- 1.9377
4 2.6775
4 0.51
5 1.275
7 0.67
10 0.68
- 4.62
- 0.33
- 0.38
- 1.408
- 1.24
- 1.2249
- 0.6978
- 5.8392
- 1.56
Total 25.037275
- 459.2625
- 459.2625
Total 918.525

- 64.46
- 161.57
- 29.9
- 56.07
- 0
- 0
- 0
Total 312

- 167.66
- 13.2
- 55.3
110.6
8.8
- 33
Total 404.6976

- 219.64
- 86.1
Total 305.74

- 459.2625
- 276.72
- 15.6
- 219.64
- 24.6
Total 971.2225

- 24.6
- 1
- 17.5
Total 43.1
RENCANA ANGGARAN BIAYA
PEMBANGUNAN TOKO BANYUMANIK

Project : Banyumanik
Lokasi : Jalan Jati Raya, Jawa Tengah

HARGA SATUAN JUMLAH HARGA


NO. URAIAN PEKERJAAN + MATERIAL VOL. SAT.
(Rupiah) (Rupiah)

A PEKERJAAN PERSIAPAN
1 Pembongkaran Dinding 68.90 m2 0.00
2 Pembongkaran Plafond 201.24 m2 0.00
3 Pembongkaran Atap dan Rangka Atap 179.98 m2 0.00
4 Pembongkaran Folding Gate 2.00 ls 0.00
5 Mob/Demob 1.00 ls 0.00
6 Pagar Proyek Sementara 1.00 ls 0.00
SUB-TOTAL 0.00

B PEKERJAAN URUGAN DAN GALIAN


1 Pekerjaan Galian Tanah Pondasi Batu Kali 24.35 m3 0.00
2 Pekerjaan Urug Tanah Kembali Pondasi Batu Kali 14.65 m3 0.00
3 Pasir Urug Pondasi Batu Kali t=10cm 4.06 m3 0.00
4 Lantai Kerja Pondasi Batu Kali t=5cm 2.03 m3 0.00
5 Pengurugan Puing Asumsi 50% 114.94 m3 0.00
6 Pemadatan Puing 230.41 m3 0.00
7 Pasir Urug Lantai t=10cm 23.04 m3 0.00
8 Pekerjaan Galian Pondasi Foot Plat 5.40 m3 0.00
9 Pekerjaan Urug Tanah Kembali Pondasi Foot Plat 5.29 m3 0.00
10 Pasir Urug Pondasi Foot Plat t=10cm 0.54 m3 0.00
11 Lantai Kerja Pondasi Foot Plat t=5cm 0.27 m3 0.00
SUB-TOTAL 0.00

C PEKERJAAN PASANGAN
1 Pemasangan Batu Kosong (Anstamping) t=20cm 4.85 m3 0.00
2 Pemasangan Pondasi Batu Kali t=40cm 4.85 m3 0.00
3 Pemasangan Bata Ringan/Hebel Lt.1 & Lt.2 tbl=10cm 229.63 m2 0.00
4 Pemasangan Pintu Existing 3.00 pcs 0.00
SUB-TOTAL 0.00

D PEKERJAAN BETON
1 Pemasangan Pondasi Foot Plat 60x60x20 0.27 m3 0.00
2 Sloof Beton Bertulang 15x20 1.94 m3 0.00
3 Kolom Beton Bertulang 35x45 (K1) 2.68 m3 0.00
4 Kolom Beton Bertulang 15x20 (K2) 0.51 m3 0.00
5 kolom Beton Bertulang 20x30 (K3) 1.28 m3 0.00
6 Kolom Praktis Beton Bertulang 15x15 Lt.1 (KP) 0.67 m3 0.00
7 Kolom Praktis Beton Bertulang 15x15 Lt.2 (KP) 0.68 m3 0.00
8 Balok Beton Bertulang 35x75 (B1) 4.62 m3 0.00
9 Balok Beton Bertulang 15x25 (B2) 0.33 m3 0.00
10 Balok Beton Bertulang 15x20 (B3) 0.38 m3 0.00
11 Balok Beton Bertulang 20x40 (B4) 1.41 m3 0.00
12 Balok Anak Beton Bertulang 15x30 (BA) 1.24 m3 0.00
13 Ring Balok Beton Bertulang 15x15 (RB) 1.22 m3 0.00
14 Pekerjaan Tangga Beton 0.70 m3 0.00
15 Pekerjaan Dak beton lt.2 tbl=12cm 5.84 m3 0.00
16 Dak Talang/Kanopi Beton tbl=10 cm, l=60cm, t=30cm 1.56 m3 0.00
SUB-TOTAL 0.00
E PEKERJAAN PLESTERAN
1 Plester Dinding 459.26 m2 0.00
2 Acian Dinding 459.26 m2 0.00
SUB-TOTAL 0.00

F PEKERJAAN LANTAI DAN PELAPIS DINDING


1 Pekerjaan Screed Carport tbl=10cm 64.46 m2 0.00
2 Pekerjaan Lantai keramik 40x40 (Sales+Teras) Merk Roman 161.57 m2 0.00
3 Pekerjaan Lantai Keramik 30x30 (Mess,Gudang, Musholla) Merk Mulia 56.07 m3 0.00
4 Pekerjaan Lantai keramik 20x20 (Toilet) 29.90 m2 0.00
SUB-TOTAL 0.00

G PEKERJAAN KUSEN, DAUN PINTU, DAN JENDELA


1 Pemasangan Folding Gate 2 unit t=3m 24.60 m2 0.00
2 Pemasangan Pintu Kaca 10mm Komplit t=2,8m 1.00 unit 0.00
3 Pemasangan Kaca Framess 10mm t-2,8m 17.50 m2 0.00
SUB-TOTAL 0.00

H PEKERJAAN RAILLING & PARTISI


1 Pekerjaan Railling Hollow Galvanis 40x40x1,2 + Pengecatan 6.40 m1 0.00
SUB-TOTAL 0.00

I PEKERJAAN RANGKA DAN PENUTUP ATAP


1 Rangka Atap Baja Ringan tbl=0,75 + Penutup Atap Spandek tbl=0,35 167.66 m2 0.00
2 Kanopi Hollow + Penutup Atap Spandek tbl=0,35 13.20 m2 0.00
3 Pemasangan Dinding Sopi-Sopi 55.30 m2
4 Plester + Aci Dinding Sopi-Sopi 110.60 m2
5 Flasing Tepi Tembok Area Samping 33.00 m1
6 Pekerjaan Nok Penutup Atap 12.15 m1 0.00
SUB-TOTAL 0.00

J PEKERJAAN PLAFOND
1 Pekerjaan Plafond Gypsum + Rangka Hollow 9mm 219.64 m2 0.00
2 Pekerjaan List plafond gypsum 86.10 m1 0.00
SUB-TOTAL 0.00

K PEKERJAAN PENGECATAN
1 Pengecatan Dinding Interior 459.26 m2 0.00
2 Pengecatan Dinding Eksterior 276.72 m2 0.00
3 Pengecatan Waterproofing Dak Talang 15.60 m2 0.00
4 Pengecatan Plafond Gypsum 219.64 m2 0.00
5 Pengecatan Folding Gate 24.60 m2 0.00
SUB-TOTAL 0.00

L PEKERJAAN SANITASI
1 Pekerjaan Roofdrain 2.00 pcs 0.00
2 Pekerjaan Instalasi Air Bekas 3" + Sambungan 41.00 m1 0.00
3 Pekerjaan Instalasi Air Kotor 4" + Sambungan 6.50 m1 0.00
4 Pekerjaan CO 4" 2.00 pcs 0.00
5 Pekerjaan Septictank 1.00 ls 0.00
SUB-TOTAL 0.00
M PEKERJAAN LAIN-LAIN
1 Pembersihan Lahan 1.00 ls 0.00
SUB-TOTAL 0.00

GRAND TOTAL