JADWAL PELAKSANAAN PEKE

PEKERJAAN PEMBANGUNAN RUMA


HARGA BOBOT JANUARI FEBUARI MARET APRIL
NO JENIS PEKERJAAN
( Rp. ) (%) I II III IV V I II III IV V I II III IV V I
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
1 Pekerjaan Persiapan Rp 8,694,927.56 2.349 0.0670 0.0670 0.0670 0.0670 0.0670 0.0670 0.0670 0.0670 0.0670 0.0670 0.0670 0.0670 0.0670
2 Pekerjaan Pondasi Rp 70,172,089.49 18.961 2.0450 2.0450 2.0450 2.0450 2.0450 2.0450 2.0450 2.0460 2.0460 2.0460 2.0460 2.0460
3 Pekerjaan Beton Bertulang Rp 43,398,341.44 11.726 0.4619 0.4619 0.4619 0.4619 0.4619 0.4619 0.4619 0.4619 0.4619 0.4619 0.4619
4 Pekerjaan Pasangan Dinding dan Plesteran Rp 60,581,342.22 16.369 0.7522 0.7522 0.7522 0.7522 0.7522 0.7522 0.7522 0.7522 0.7522 0.7522
5 Pekerjaan Atap Rp 58,863,085.45 15.905 0.5482 0.5482 0.5482 0.5482 0.5482 0.5482 0.5482
6 Pekerjaan Langit-Langit Rp 18,911,596.55 5.110 0.3252 0.3252 0.3252 0.3252 0.3252 0.3252 0.3252
7 Pekerjaan Lantai Rp 48,401,998.63 13.078 0.9359 0.9359 0.9359 0.9359 0.9359 0.9359 0.9359
8 Pekerjaan Saluran Rp 373,816.74 0.101
9 Pekerjaan Kusen Pintu dan Jendela Rp 30,752,413.63 8.309 1.3746 1.3746

10 Pekerjaan Pengecatan Rp 26,706,615.02 7.216 0.4592 0.4592 0.4592 0.4592 0.4592 0.4592

11 Pekerjaan Lain - Lain Rp 3,237,984.38 0.875 0.1207 0.1207


JUMLAH 1 + 2 Rp 370,094,211.09 100.000 0.529 2.574 3.259 2.985 2.864 2.864 1.829 4.316 5.281 5.716 3.001 2.763 4.742 2.900 4.588 6.218
% KOMULATIF 0.529 3.103 6.362 9.347 12.211 15.075 16.905 21.221 26.502 32.218 35.220 37.982 42.724 45.624 50.212

JANUARI FEBUARI MARET APRIL


NO JENIS PEKERJAAN
I II III IV V I II III IV V I II III IV V I II III
1 Pekerjaan Persiapan
2 Pekerjaan Pondasi
3 Pekerjaan Beton Bertulang
4 Pekerjaan Pasangan Dinding dan Plesteran
5 Pekerjaan Atap
6 Pekerjaan Langit-Langit
7 Pekerjaan Lantai
8 Pekerjaan Saluran
9 Pekerjaan Kusen Pintu dan Jendela
10 Pekerjaan Pengecatan
11 Pekerjaan Lain - Lain

KETERANGAN
: WAKTU PENGERJAAN PEKERJAAN PERSIAPAN
: WAKTU PENGERJAAN PEKERJAAN PONDASI
: WAKTU PENGERJAAN PEKERJAAN BETON BERTULANG
: WAKTU PENGERJAAN PEKERJAAN DINDING DAN PLESTERAN
: WAKTU PENGERJAAN PEKERJAAN ATAP
: WAKTU PENGERJAAN PEKERJAAN LANGIT-LANGIT
: WAKTU PENGERJAAN PEKERJAAN LANTAI
: WAKTU PENGERJAAN PEKERJAAN SALURAN
: WAKTU PENGERJAAN KUSEN PINTU DAN JENDELA
: WAKTU PENGERJAAN PEKERJAAN PENGECETAN
WAKTU PENGERJAAN PEKERJAAN LAIN - LAIN
ANAAN PEKERJAAN KURVA "S"
UNAN RUMAH TINGGAL TIPE 100 M2
APRIL MEI JUNI JULI AGUSTUS
KET
II III IV V I II III IV V I II III IV V I II III IV V I II III IV V
21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45
0.0670 0.0670 0.0670 0.0670 0.0670 0.0670 0.0670 0.0670 0.0670 0.0670 0.0670 0.0670 0.0670 0.0670 0.0670 0.0670 100
2.0460 2.0460 2.0460 90
0.4619 0.4619 0.4619 0.4619 0.4619 0.4619 0.4619 0.4619 0.4619 0.4619 80
0.7522 0.7522 0.7522 0.7522 0.7522 0.7522 0.7522 0.7522 70
0.5482 0.5482 0.5482 0.5482 0.5482 0.5482 0.5482 0.5482 0.5482 0.5481 0.5481 0.5481 0.5481 0.5481 0.5481 0.5481 0.5481 60
0.3251 0.3251 0.3251 0.3251 0.3251 0.3251 50
0.9359 0.9359 0.9359 0.9359 0.9359 0.9359 0.9359 40
0.014 0.014 0.014 0.014 0.014 0.014 30
1.3746 1.3746 1.3746 20
0.4592 0.4591 0.4591 0.4591 0.4591 0.4591 0.4591 10
0.1207 0.1207 0.1206 0.1206 0
3.345 2.085 5.724 4.674 5.595 1.950 1.794 2.703 2.217 2.271 1.829 1.021 2.586 0.543 1.536 0.000 0.647 0.629 0.014 0.562 0.548 0.615 0.067 0.615 100
56.430 59.775 61.860 67.583 72.258 77.853 79.803 81.598 84.300 86.517 88.788 90.618 91.639 94.225 94.768 96.304 96.304 96.951 97.580 97.594 98.156 98.704 99.319 99.386

APRIL MEI JUNI JULI AGUSTUS


IV V I II III IV V I II III IV V I II III IV V I II III IV V
REKAPITULASI RENCANA ANGGARAN BIAYA
PEMBUATAN RUMAH TINGGAL TIPE 100 M2

No JENIS PEKERJAAN
1 Pekerjaan Persiapan
2 Pekerjaan Pondasi
3 Pekerjaan Beton Bertulang
4 Pekerjaan Pasangan Dinding dan Plesteran
5 Pekerjaan Atap
6 Pekerjaan Langit-Langit
7 Pekerjaan Lantai
8 Pekerjaan Saluran
9 Pekerjaan Kusen Pintu dan Jendela
10 Pekerjaan Pengecatan
11 Pekerjaan Lain - Lain
Jumlah 1
10% PPN
Jumlah
Dibulatkan
Terbilang : Empat Ratus Sepuluh Juta Rupiah
APITULASI RENCANA ANGGARAN BIAYA
MBUATAN RUMAH TINGGAL TIPE 100 M2

Rp 8,694,927.56
Rp 70,172,089.49
Rp 43,398,341.44
Rp 60,581,342.22
Rp 58,863,085.45
Rp 18,911,596.55
Rp 48,401,998.63
Rp 373,816.74
Rp 30,752,413.63
Rp 26,706,615.02
Rp 3,237,984.38
Rp 370,094,211.09
Rp 37,009,421.11
Rp 407,103,632.20
Rp 410,000,000.00
tus Sepuluh Juta Rupiah

Diperiksa :

Ir. A. Syukri Malian, M.T.


RENCANA ANGGARAN BIAYA PEKERJAAN
PEMBUATAAN RUMAH TINGGAL TIPE 100 M2

NO Uraian Pekerjaan
I Pek. Persiapan Volume Satuan
1 Pembersihan Lapangan 270 M₂
2 Pemasangan Bowplank 51.61 M₁
3 Air Kerja 1 Ls

II Pek. Pondasi Volume Satuan


1 Pek. Galian Tanah Pondasi 179.04 M₃
2 Pek. Urugan Pasir Dibawah Pondasi 7.62 M₃
3 Pek. Pasangan Pondasi Batu Kali ad. 1:4 49.24 M₃
4 Pek. Urugan Tanah Kembali 44.91 M₃
1
III Pek. Beton Bertulang Volume Satuan
1 Pek. Plat Beton Atap Teras 0.29 M₃
2 Pek. Beton Bertulang Sloof 15 x 20 cm 2.2 M₃
3 Pek. Beton Bertulang Kolom 13 x 13 cm 1.24 M₃
4 Pek. Beton Bertulang Balok 15 x 20 cm 2.295 M₃

IV Pek. Pasangan Dinding dan Plesteran Volume Satuan


1 Pek. Pasangan Dinding Batu Bata ad. 1:4 218.395 M₂
2 Pek. Plesteran Kolom ad. 1:2 38.22 M₂
3 Pek. Plesteran Dinding Batu Bata ad. 1:4 587.621 M₂

V Pek. Atap Volume Satuan


1 Pek. Balok Dinding 8/12 Kayu Kelas II 0.243 M₃
2 Pek. Kuda-Kuda Kayu 8/12 Kayu Kelas II 0.674 M₃
3 Pek. Balok Gording 8/12 Kayu Kelas II 0.714 M₃
4 Pek. Bubungan 8/12 Kayu Kelas II 0.338 M₃
5 Pek. Rangka Atap Kayu Kelas II 143.873 M₂
6 Pek. Atap Genteng Kodok 143.873 M₂
7 Pek. Nok Genteng Kodok 35.16 M₁
8 Pek. Baut Konstruksi 2 Ls
9 Pek. Lisplank 14.5 M₂

VI Pek. Langit-Langit Volume Satuan


1 Pek. Langit-Langit Gypsum 12 mm 96.04 M₂

VII Pek. Lantai Volume Satuan


1 Pek. Urugan Pasir di bawah Lantai 10.022 M₃
2 Pek. Floor Lantai ad. 1:3:5 5.011 M₃
3 Pek .Pemasangan Lantai Keramik 40/40 77.52 M₂
4 Pek .Pemasangan Lantai Teras Keramik 30/30 4.5 M₂
5 Pek .Pemasangan Lantai WC Keramik 20/20 4 M₂
6 Pek .Pemasangan Dinding Porselin 10 x 10 cm 18.6 M₁

VIII Pek. Saluran Volume Satuan


1 Pek.Pas. Pipa PVC 3/4 inci 35.75 M₁
1 Pek.Pas. Pipa PVC 3 inci 27.37 M₁
1 Pek.Pas. Pipa PVC 4 inci 2.72 M₁

IX Pek. Kusen Pintu dan Jendela Volume Satuan


1 Pek. Kusen Kayu Kls. II 6/12 1.502 M₃
2 Pek. Daun Pintu Lipat 5.53 M₂
3 Pek. Daun Pintu Kayu Kls. II 6.311 M₂
4 Pek. Daun Jendela Kayu Kls. II 3 M₂
5 Pek. Pintu PVC + Kusen Tipe B 2 bh

X Pek. Pengecatan Volume Satuan


1 Pek. Pengecatan Dinding dan Kolom 513.23 M₂
2 Pek. Pengecatan Lisplank 14.4 M₂

XI Pek. Lain-Lain Volume Satuan


1 Dokumentasi dan Laporan 1 Ls
2 As Built Drawing 1 Ls
3 Pembersihan Akhir 270 M₂
NA ANGGARAN BIAYA PEKERJAAN
AAN RUMAH TINGGAL TIPE 100 M2

Harga Satuan Jumlah Harga


Rp 16,500.00 Rp 4,455,000.00
Rp 80,506.25 Rp 4,154,927.56
Rp 85,000.00 Rp 85,000.00
SUB TOTAL Rp 8,694,927.56
Harga Satuan Jumlah Harga
Rp 41,800.00 Rp 7,483,872.00
Rp 135,575.00 Rp 1,033,081.50
Rp 1,233,863.13 Rp 60,755,420.28
Rp 20,033.75 Rp 899,715.71
SUB TOTAL Rp 70,172,089.49
Harga Satuan Jumlah Harga
Rp 3,873,787.50 Rp 1,123,398.38
Rp 6,375,905.60 Rp 14,026,992.33
Rp 7,664,541.85 Rp 9,504,031.90
Rp 8,656,783.10 Rp 19,867,317.22
SUB TOTAL Rp 43,398,341.44
Harga Satuan Jumlah Harga
Rp 128,308.13 Rp 28,021,852.96
Rp 57,024.69 Rp 2,179,483.56
Rp 51,700.00 Rp 30,380,005.70
SUB TOTAL Rp 60,581,342.22
Harga Satuan Jumlah Harga
Rp 11,352,000.00 Rp 2,758,536.00
Rp 11,352,000.00 Rp 7,651,248.00
Rp 11,210,031.25 Rp 8,003,962.31
Rp 11,210,031.25 Rp 3,788,990.56
Rp 125,675.00 Rp 18,081,239.28
Rp 62,834.06 Rp 9,040,125.07
Rp 109,147.50 Rp 3,837,626.10
Rp 1,887,000.00 Rp 3,774,000.00
Rp 132,921.25 Rp 1,927,358.13
SUB TOTAL Rp 58,863,085.45
Harga Satuan Jumlah Harga
Rp 196,913.75 Rp 18,911,596.55
SUB TOTAL Rp 18,911,596.55
Harga Satuan Jumlah Harga
Rp 135,575.00 Rp 1,358,732.65
Rp 155,497.41 Rp 779,197.52
Rp 501,192.66 Rp 38,852,454.71
Rp 229,707.50 Rp 1,033,683.75
Rp 229,707.50 Rp 918,830.00
Rp 293,500.00 Rp 5,459,100.00
SUB TOTAL Rp 48,401,998.63
Harga Satuan Jumlah Harga
Rp 23,544.13 Rp 841,702.47
Rp 95,074.03 Rp 2,602,176.24
Rp 137,432.63 Rp 373,816.74
SUB TOTAL Rp 373,816.74
Harga Satuan Jumlah Harga
Rp 13,011,625.00 Rp 19,543,460.75
Rp 522,500.00 Rp 2,889,425.00
Rp 774,125.00 Rp 4,885,502.88
Rp 644,050.00 Rp 1,932,150.00
Rp 750,937.50 Rp 1,501,875.00
SUB TOTAL Rp 30,752,413.63
Harga Satuan Jumlah Harga
Rp 50,377.25 Rp 25,855,116.02
Rp 59,131.88 Rp 851,499.00
SUB TOTAL Rp 26,706,615.02
Harga Satuan Jumlah Harga
Rp 425,000.00 Rp 425,000.00
Rp 850,000.00 Rp 850,000.00
Rp 7,270.31 Rp 1,962,984.38
SUB TOTAL Rp 3,237,984.38
DAFTAR ANALISA PEKERJAAN KOTA
TAHUN ANGGARAN 201

NO.
URAIAN
Analisa

1 2

I PEKERJAAN PERSIAPAN

1 M2 Membersihkan Lapangan dan Perataan


a. Bahan
0.100 Oh Pekerja
0.050 Oh Mandor

Jumlah

1 M' Pengukuran dan Pemasangan Bouwplank


a. Bahan
0.012 M3 Kayu 5/7 kelas IV
0.020 Kg Paku Biasa 2" - 5"
0.007 M3 Kayu Papan 3/20

b. Tenaga
0.100 Oh Tukang Kayu
0.100 Oh Pekerja
0.010 Oh Kepala Tukang
0.005 Oh Mandor

Jumlah

1 M2 Pembuatan Gudang Semen dan Alat - Alat


a. Bahan
1.700 Btg Kayu Gelam dia. 6-8
0.210 M3 Kayu
0.300 Kg Paku Biasa
10.500 Kg Semen Portland
0.030 M3 Pasir Beton
0.050 M3 Koral Beton
1.500 Lbr Seng Gelombang BJLS

b. Tenaga
2.000 Oh Tukang Kayu
1.000 Oh Pekerja
0.200 Oh Kepala Tukang
0.050 Oh Mandor

Jumlah
NO.
URAIAN
Analisa

1 2
1 M Pembuatan Bak Adukan Ukuran (40 x 50 x 20) cm
2

a. Bahan
0.036 M3 Kayu Kls. IV
0.080 Kg Paku Biasa
1.000 Btg Kaso 5/7

b. Tenaga
0.300 Oh Tukang Kayu
0.0015 Oh Mandor

Jumlah

1 M2 Pembuatan Stegger dari Bambu, Ukuran (40 x 50 x 20) cm


a. Bahan
1.000 Btg Bambu & 6 - 8 /600 cm
0.250 Kg Tali Ijuk

b. Tenaga
0.017 Oh Tukang Kayu
0.002 Oh Kepala Tukang
0.250 Oh Pekerja
0.013 Oh Mandor

Jumlah

10 M2 Pembersihan Akhir Lapangan


a. Tenaga
0.7500 Oh Pekerja
0.0375 Oh Mandor

Jumlah
Untuk 1 M2
Jumlah

II PEKERJAAN TANAH

1 M3 Galian Tanah Biasa Sedalam 1 Meter


a. Tenaga
0.400 Oh Pekerja
- - Tukang Gali
- - Kepala Tukang
0.040 Oh Mandor

Jumlah
NO.
URAIAN
Analisa

1 2
1 M3 Galian Tanah Biasa Sedalam 2 Meter
a. Tenaga
0.526 Oh Pekerja
- - Tukang Gali
- - Kepala Tukang
0.052 Oh Mandor

Jumlah
1 M3 Urugan Kembali
a. Tenaga
0.192 Oh Pekerja
- - Tukang Gali
- - Kepala Tukang
0.019 Oh Mandor

Jumlah

1 M3 Pemadatan Tanah
a. Tenaga
0.500 Oh Pekerja
- - Tukang Gali
- - Kepala Tukang
0.050 Oh Mandor

Jumlah

1 M3 Urugan Pasir
a. Bahan
1.200 M3 Pasir Urug

b. Tenaga
0.300 Oh Pekerja
- - Tukang Gali
- - Kepala Tukang
0.010 Oh Mandor

Jumlah

III PEKERJAAN PONDASI


1 M3 Pasang Pondasi Batu Kali, 1 Pc : 3 Ps
a. Bahan
1.100 M3 Batu Belah 15/20 cm / batu kali
202.000 Kg Semen Portland
0.485 M3 Pasir Pasang

b. Tenaga
1.500 Oh Pekerja
0.600 Oh Tukang Batu
NO.
URAIAN
Analisa

1 2
0.060 Oh Kepala Tukang
0.075 Oh Mandor

Jumlah
1 M3 Pas. Pondasi Batu Bata Ad. 1 : 4
a. Bahan
782 Bh Batu Bata Lobang
2.024 Zak Semen Portland
0.406 M3 Pasir Pasang

b. Tenaga
0.600 Oh Tukang Batu
0.060 Oh Kepala Tukang
1.500 Oh Pekerja
0.075 Oh Mandor

Jumlah

IV PEKERJAAN DINDING

1 M2 Pasangan Bata Lobang Tebal 1/2 Bata, 1 Pc : 2 Ps


a. Bahan
58.5 Bh Bata Lobang 9 x 9 x 19 cm
18.950 Kg Semen Portland
0.0380 M3 Pasir Pasang

b. Tenaga
0.320 Oh Pekerja
0.100 Oh Tukang Batu
0.010 Oh Kepala Tukang
0.015 Oh Mandor

Jumlah

1 M2 Pasangan Bata Lobang Tebal 1/2 Bata, 1 Pc : 4 Ps


a. Bahan
58.5 Bh Bata Lobang 9 x 9 x 19 cm
11.500 Kg Semen Portland
0.0430 M3 Pasir Pasang

b. Tenaga
0.320 Oh Pekerja
0.100 Oh Tukang Batu
0.010 Oh Kepala Tukang
0.015 Oh Mandor

Jumlah
NO.
URAIAN
Analisa

1 2

V PEKERJAAN PLESTERAN

1 M2 Plesteran 1 Pc : 2 Ps, Tebal 15 mm


a. Bahan
8.520 Kg Semen Portland
0.017 M3 Pasir Pasang

b. Tenaga
0.200 Oh Pekerja
0.150 Oh Tukang Batu
0.015 Oh Kepala Tukang
0.010 Oh Mandor

Jumlah

1 M2 Plesteran 1 Pc : 4 Ps, Tebal 15 mm


a. Bahan
5.200 Kg Semen Portland
0.020 M3 Pasir Pasang

b. Tenaga
0.200 Oh Pekerja
0.150 Oh Tukang Batu
0.015 Oh Kepala Tukang
0.010 Oh Mandor

Jumlah

1 M2 Plesteran Ciprat 1 Pc : 2 Ps
a. Bahan
4.320 Kg Semen Portland
0.016 M3 Pasir Pasang

b. Tenaga
0.250 Oh Pekerja
0.100 Oh Tukang Batu
0.010 Oh Kepala Tukang
0.015 Oh Mandor

Jumlah

1 M2 Plesteran Siar Adukan 1 Pc : 2 Ps


a. Bahan
4.320 Kg Semen Portland
0.016 M3 Pasir Pasang

b. Tenaga
0.150 Oh Pekerja
0.070 Oh Tukang Batu
0.007 Oh Kepala Tukang
NO.
URAIAN
Analisa

1 2
0.008 Oh Mandor

Jumlah
1 M3 Perekat
a. Bahan
10.588 Zak Semen Portland
1.080 M3 Pasir Pasang

Jumlah

VI PEKERJAAN KAYU

1 M3 Pasang Kusen Pintu dan Jendela Kayu Kls. II


a. Bahan
1.200 M3 Kayu Kelas II

b. Tenaga
6.000 Oh Pekerja
18.000 Oh Tukang Kayu
2.000 Oh Kepala Tukang
0.300 Oh Mandor

Jumlah

1 M2 Pasang Pintu Panel Kayu Kls. II


a. Bahan
0.040 M3 Kayu Kls. II

b. Tenaga
1.000 Oh Pekerja
2.500 Oh Tukang Kayu
0.250 Oh Kepala Tukang
0.050 Oh Mandor

Jumlah

1 M2 Pasang Pintu dan Jendela Kaca Kayu Kls. II


a. Bahan
0.035 M3 Kayu Kls. II

b. Tenaga
0.800 Oh Pekerja
2.000 Oh Tukang Kayu
0.200 Oh Kepala Tukang
0.040 Oh Mandor
NO.
URAIAN
Analisa

1 2

Jumlah
NO.
URAIAN
Analisa

1 2

1 M2 Pasang Pintu dan Jendela Jalusi Kayu Kls. II


a. Bahan
0.064 M3 Kayu Kls. II

b. Tenaga
1.000 Oh Pekerja
3.000 Oh Tukang Kayu
0.300 Oh Kepala Tukang
0.500 Oh Mandor

Jumlah

1 Buah Pas. Pintu PVC + Kusen Type B


a. Bahan
1.00 Bh Pintu PVC + kusen
1.00 Set Engsel
1.00 Bh Kunci

b. Upah
1.00 Ls Tukang Pasang

Jumlah

1 M2 Pasang Pintu Plywood Rangkap, Rangka Kayu Kls. II


a. Bahan
0.0196 M3 Kayu Kls. II
0.030 Kg Paku Biasa /2" - 1"
1

0.300 Ltr Lem Kayu


1.000 Lbr Plywood 4' x 8' x 4 mm

b. Tenaga
0.600 Oh Pekerja
2.000 Oh Tukang Kayu
0.200 Oh Kepala Tukang
0.030 Oh Mandor

Jumlah

1 M3 Pasang Konstruksi Kuda-kuda Kayu Kls. II


a. Bahan
1.100 M3 Kayu Kelas II, Balok
15 Kg Besi Strip
0.800 Kg Paku Biasa 2" - 5"

b. Tenaga
4.000 Oh Pekerja
12.000 Oh Tukang Kayu
1.200 Oh Kepala Tukang
NO.
URAIAN
Analisa

1 2
0.200 Oh Mandor

Jumlah

1 M2 Pasang Kaso + Reng Genteng Kayu Kls. II


a. Bahan
0.012 M3 Kayu Kelas II, Untuk genteng kodok/biasa
0.014 M3 Kayu Kelas II, untuk genteng beton/keramik
0.150 Kg Paku Biasa 2" - 5"
kayu kls. II, untuk genteng kodok/biasa
kayu kls. II, untuk genteng beton
b. Tenaga
0.100 Oh Pekerja
0.100 Oh Tukang Kayu
0.010 Oh Kepala Tukang
0.005 Oh Mandor

kayu kls. II, untuk genteng kodok/biasa


kayu kls. II, untuk genteng beton

1 M3 Gording, Sako, Kitau, Blandar Kayu Kelas II


a. Bahan
1.100 M3 Kayu Kelas II
0.250 Kg Paku

b. Tenaga
15.000 Oh Tukang
1.500 Oh Kepala Tukang
0.100 Oh Pekerja
0.250 Oh Mandor

Jumlah
1 M2 Pasang Rangka Langit-langit (30 x 60) cm, Kayu Kls. II
a. Bahan
0.023 M3 Kayu Kls. II
0.150 Kg Paku Biasa 2" - 5"

b. Tenaga
0.200 Oh Pekerja
0.300 Oh Tukang Kayu
0.030 Oh Kepala Tukang
0.010 Oh Mandor

Jumlah

1 M' Pasang Lisplang Ukuran (3 x 30) cm, Kayu Kls. II


a. Bahan
0.011 M3 Kayu Kls. II
0.050 Kg Paku Biasa 2" - 5"

b. Tenaga
NO.
URAIAN
Analisa

1 2
0.110 Oh Pekerja
0.220 Oh Tukang Kayu
0.022 Oh Kepala Tukang
NO.
URAIAN
Analisa

1 2
0.005 Oh Mandor

Jumlah

VII PEKERJAAN BETON

1 M3 Membuat Beton Tumbuk, 1 Pc : 3 Ps : 5 Kr


a. Bahan
218 Kg Semen Portland
0.520 M3 Pasir Beton
0.870 M3 Koral Beton

b. Tenaga
1.650 Oh Pekerja
0.250 Oh Tukang Batu
0.025 Oh Kepala Tukang
0.080 Oh Mandor

Jumlah

1 M2 Membuat Lantai Kerja Beton Tumbuk, 1 Pc : 3 Ps : 5 Kr, Tebal 5 cm


a. Bahan
10.000 Kg Semen Portland
0.026 M3 Pasir Beton
0.044 M3 Koral Beton

b. Tenaga
1.150 Oh Pekerja
0.020 Oh Tukang Batu
0.002 Oh Kepala Tukang
0.006 Oh Mandor

Jumlah

1 M3 Membuat Pondasi Beton Bertulang ( 150 Kg Besi + Bekisting )


a. Bahan
0.200 M3 Kayu Kls. IV
1.500 Kg Paku Biasa 2"- 5"
130 Kg Besi Beton Polos
2.250 Kg Kawat Beton
323 Kg Semen Portland
0.520 M3 Pasir Beton
0.780 M3 Koral Beton

b. Tenaga
3.900 Oh Pekerja
0.350 Oh Tukang Batu
1.040 Oh Tukang Kayu
1.050 Oh Tukang Besi
0.245 Oh Kepala Tukang
NO.
URAIAN
Analisa

1 2
0.165 Oh Mandor

Jumlah

1 M3 Membuat Sloof Beton Bertulang ( 200 Kg Besi + Bekisting )


a. Bahan
0.270 M3 Kayu Kls. IV
2.000 Kg Paku Biasa 2"- 5"
140 Kg Besi Beton Polos
3.000 Kg Kawat Beton
323 Kg Semen Portland
0.520 M3 Pasir Beton
0.780 M3 Koral Beton

b. Tenaga
4.850 Oh Pekerja
0.350 Oh Tukang Batu
1.560 Oh Tukang Kayu
1.400 Oh Tukang Besi
0.331 Oh Kepala Tukang
0.170 Oh Mandor

Jumlah

1 M3 Beton Plat
a. Bahan
1.000 x Beton Cor ad. 1 : 2 : 3
1.000 x Bekisting Plat
1.000 x Biaya Bongkaran Bekisting
Jumlah

1 M3 Membuat Kolom Beton Bertulang ( 200 Kg Besi + Bekisting )


a. Bahan
0.400 M3 Kayu Kls. IV
4.000 Kg Paku Biasa 2"- 5"
140 Kg Besi Beton Polos
4.500 Kg Kawat Beton
232 Kg Semen Portland
0.520 M3 Pasir Beton
0.780 M3 Koral Beton
0.150 M3 Kayu Balok Kls. IV
20 Btg Kayu Gelam dia. 6-8 cm

b. Tenaga
7.300 Oh Pekerja
0.350 Oh Tukang Batu
3.300 Oh Tukang Kayu
2.100 Oh Tukang Besi
NO.
URAIAN
Analisa

1 2
0.570 Oh Kepala Tukang
0.250 Oh Mandor

Jumlah

1 M3 Membuat Balok Beton Bertulang ( 200 Kg Besi + Bekisting )


a. Bahan
0.320 M3 Kayu Kls. IV
3.200 Kg Paku Biasa 2"- 5"
200 Kg Besi Beton Polos
3 Kg Kawat Beton
232 Kg Semen Portland
NO.
URAIAN
Analisa

1 2
0.520 M3 Pasir Beton
0.780 M3 Koral Beton
0.140 M3 Kayu Balok Kls. IV
16 Btg Kayu Gelam dia. 6-8 cm

b. Tenaga
5.960 Oh Pekerja
0.350 Oh Tukang Batu
2.800 Oh Tukang Kayu
1.400 Oh Tukang Besi
0.455 Oh Kepala Tukang
0.208 Oh Mandor

Jumlah

1 M' Membuat Kolom Penguat Beton Bertulang ( 11 x 11 ) cm + bekisting (kolom praktis)


a. Bahan
0.002 M3 Kayu Kls. IV
0.010 Kg Paku Biasa 2"- 5"
3.000 Kg Besi Beton Polos
0.450 Kg Kawat Beton
4.000 Kg Semen Portland
0.006 M3 Pasir Beton
0.009 M3 Koral Beton

b. Tenaga
0.060 Oh Pekerja
0.020 Oh Tukang Batu
0.020 Oh Tukang Kayu
0.020 Oh Tukang Besi
0.006 Oh Kepala Tukang
0.003 Oh Mandor

Jumlah

1 M2 Pasang Bekisting Untuk Lantai, plat dak dengan plywood 4 mm


a. Bahan
0.040 M3 Kayu Kls. IV
0.400 Kg Paku Biasa 2"- 5"
0.015 M3 Balok Kayu Kls.IV
0.350 Lbr Plywood 4 mm
6.000 Btg Kayu Gelam dia. 6-8 cm

b. Tenaga
0.320 Oh Pekerja
0.330 Oh Tukang Batu
0.033 Oh Kepala Tukang
0.006 Oh Mandor

Jumlah
NO.
URAIAN
Analisa

1 2

VIII PEKERJAAN PENUTUP ATAP

1 M2 Pasang Atap Genteng Kodok


a. Bahan
25.000 Bh Genteng Kodok

b. Tenaga
0.150 Oh Pekerja
0.075 Oh Tukang Kayu
0.008 Oh Kepala Tukang
0.008 Oh Mandor

Jumlah

1 M' Pasang Bubung Genteng Kodok


a. Bahan
5.000 Bh Genteng Bubung Kodok
8.000 Kg Semen Portland
0.032 M3 Pasir Pasang

b. Tenaga
0.400 Oh Pekerja
0.200 Oh Tukang Kayu
0.020 Oh Kepala Tukang
0.002 Oh Mandor

Jumlah

IX PEKERJAAN LANGIT-LANGIT

1 M2 Langit-langit Asbes/ Eternit, Rangka Kayu Kls. II


a. Bahan
0.012 M3 Kayu Kls. II, Balok
0.060 Kg Paku Biasa
1.100 M2 Asbes/ Eternit Tebal 2,7 mm
1.100 M2 Asbes/ Eternit Tebal 3,5 mm
Tebal 2,7 mm
Tebal 3,5 mm
b. Tenaga
0.180 Oh Pekerja
0.320 Oh Tukang Kayu
0.032 Oh Kepala Tukang
0.009 Oh Mandor

1 M2 Eternit tebal 3,5 mm, rangka kayu kls. II


2 M2 Eternit tebal 2,7 mm, rangka kayu kls. II

X PEKERJAAN SANITASI
NO.
URAIAN
Analisa

1 2
Memasang 1 Buah Kloset Duduk / Monoblok
a. Bahan
1 Bh Kloset Duduk / Monoblok
Perlengkapan ( 6 % Harga Kloset )
NO.
URAIAN
Analisa

1 2

b. Tenaga
3.300 Oh Pekerja
1.100 Oh Tukang Batu
0.001 Oh Kepala Tukang
0.160 Oh Mandor

Jumlah

Memasang 1 Buah Wastafel


a. Bahan
1 Bh Wastafel
Perlengkapan ( 12 % Harga Wastafel )
6 Kg Semen Portland
0.010 M3 Pasir Pasang

b. Tenaga
1.200 Oh Pekerja
1.450 Oh Tukang Batu
0.150 Oh Kepala Tukang
0.100 Oh Mandor

Jumlah

Memasang 1 Buah Bak Mandi Teraso Volume 0,30 m3


a. Bahan
1 Bh Bak Teraso
6 Kg Semen Portland
0.010 M3 Pasir Pasang

b. Tenaga
2.100 Oh Pekerja
0.750 Oh Tukang Batu
0.070 Oh Kepala Tukang
0.110 Oh Mandor

Jumlah

Memasang 1 Buah Bak Mandi Fibreglass Volume 0,30 m3


a. Bahan
1.000 Bh Bak Fibreglass
Perlengkapan ( 18 % Harga Bak Fibreglass )

b. Tenaga
1.800 Oh Pekerja
2.700 Oh Tukang Batu
0.540 Oh Kepala Tukang
0.110 Oh Mandor
NO.
URAIAN
Analisa

1 2

Jumlah

Memasang 1 Buah Bak Mandi Porselin Batu Bata Volume 0,30 m3


a. Bahan
0.400 M3 Batu Bata
120 Kg Semen Portland
0.300 M3 Pasir Pasang
360 Bh Porselen ( 11 x 11 ) cm
6 Kg Semen Nat

b. Tenaga
6 Oh Pekerja
3 Oh Tukang Batu
0.300 Oh Kepala Tukang
0.300 Oh Mandor

Jumlah

Memasang 1 Buah Bak Kontrol Pasangan Batu Bata Ukuran (45 x 45) cm,
Tinggi 50 cm
a. Bahan
0.250 M3 Batu Bata
77.000 Kg Semen Portland
0.130 M3 Pasir Pasang
0.020 M3 Batu Kerikil
2.600 Kg Besi Beton
0.090 M3 Pasir Beton

b. Tenaga
1.420 Oh Pekerja
0.473 Oh Tukang Batu
0.047 Oh Kepala Tukang
0.071 Oh Mandor

Jumlah

Memasang 1 m' Pipa PVC Tipe AW Dia. 3/4"


a. Bahan
1.200 M' Pipa PVC
Perlengkapan ( 35 % Harga Pipa Galvanis )

b. Tenaga
0.036 Oh Pekerja
0.060 Oh Tukang Batu
0.006 Oh Kepala Tukang
0.0018 Oh Mandor

Jumlah
NO.
URAIAN
Analisa

1 2

Memasang 1 m' Pipa PVC Tipe AW Dia. 3"


a. Bahan
1.200 M' Pipa PVC
Perlengkapan ( 35 % Harga Pipa Galvanis )
NO.
URAIAN
Analisa

1 2

b. Tenaga
0.081 Oh Pekerja
0.135 Oh Tukang Batu
0.0135 Oh Kepala Tukang
0.0041 Oh Mandor

Jumlah

Memasang 1 m' Pipa PVC Tipe AW Dia. 4"


a. Bahan
1.200 M' Pipa PVC
Perlengkapan ( 35 % Harga Pipa Galvanis )

b. Tenaga
0.081 Oh Pekerja
0.135 Oh Tukang Batu
0.0135 Oh Kepala Tukang
0.0041 Oh Mandor

Jumlah

Memasang 1 Buah Bak Cuci Piring Teraso


a. Bahan
1 Bh Bak Cuci Teraso
1 Set Kran air+ Asesories
20 Kg Semen Portland
0.050 M3 Pasir pasang

b. Tenaga
0.050 Oh Pekerja
0.500 Oh Tukang Batu
0.050 Oh Kepala Tukang
0.0025 Oh Mandor

Jumlah

Memasang 1 Buah Kran Dia. 3/4" atau 1/2"


a. Bahan
1.000 Bh Kran Air
0.025 Bh Seal Tape

b. Tenaga
0.010 Oh Pekerja
0.100 Oh Tukang Batu
0.010 Oh Kepala Tukang
0.005 Oh Mandor
NO.
URAIAN
Analisa

1 2
Jumlah

1 Bh Septiktank 1,5 m x 2,0 m x 1 m dan Resapan


10.5 M3 Galian Tanah
2.625 M3 Urugan Kembali
8.400 M2 Pas. Batu Bata 1 : 3
0.300 M3 Beton Tumbuk 1 : 3 : 5
13.5 M2 Plesteran 1 : 2
0.2 M3 Plat Beton bertulang (besi 100kg,1/2 dinding)1 : 2 : 3
1 Bh Pipa Hawa 2"

Resapan
0.750 M3 Koral Beton
1 M3 Pasir Pasang
4 M' Pipa dia. 4"
2 Bh Buis Beton dia. 50 cm
10 Kg Ijuk

Jumlah

XI PEKERJAAN BESI DAN ALUMINIUM

1 m2 Pasang Terali Besi Strip


a. Bahan
11.500 M' Besi Strip 2 x 3

b. Tenaga
1.200 Oh Tukang Las
1.200 Oh Pekerja
0.012 Oh Kepala Tukang
0.00060 Oh Mandor

Jumlah

1 m2 Pasang Kawat Nyamuk


a. Bahan
1.100 M2 Kawat Nyamuk
0.020 Kg Paku Biasa /2" - 1"
1

0.0018 M Kayu Kls.III, Papan


3

b. Tenaga
0.100 Oh Pekerja
0.100 Oh Tukang Kayu
0.010 Oh Kepala Tukang
0.0005 Oh Mandor

Jumlah
XII PEKERJAAN KUNCI DAN KACA
NO.
URAIAN
Analisa

1 2
1 Buah Pasang Kunci Tanam mutu B
a. Bahan
1.000 Bh Kunci Tanam mutu B
NO.
URAIAN
Analisa

1 2

b. Tenaga
0.060 Oh Pekerja
0.600 Oh Tukang Kayu
0.060 Oh Kepala Tukang
0.003 Oh Mandor

Jumlah

1 Buah Pasang Engsel Pintu


a. Bahan
1.000 Bh Engsel Pintu

b. Tenaga
0.015 Oh Pekerja
0.150 Oh Tukang Kayu
0.015 Oh Kepala Tukang
0.00075 Oh Mandor

Jumlah

1 Buah Pasang Engsel Jendela Kuningan


a. Bahan
1.000 Bh Engsel Kuningan Jendela

b. Tenaga
0.010 Oh Pekerja
0.100 Oh Tukang Kayu
0.010 Oh Kepala Tukang
0.0005 Oh Mandor

Jumlah

1 Buah Pasang Kait Angin


a. Bahan
1.000 Bh Kait Angin

b. Tenaga
0.015 Oh Pekerja
0.150 Oh Tukang Kayu
0.015 Oh Kepala Tukang
0.00075 Oh Mandor

Jumlah

1 Buah Pasang Kunci Selot


a. Bahan
1.000 Bh Kunci Selot
NO.
URAIAN
Analisa

1 2

b. Tenaga
0.020 Oh Pekerja
0.200 Oh Tukang Kayu
0.020 Oh Kepala Tukang
0.001 Oh Mandor

Jumlah

1 Buah Pasang Pegangan Pintu / Door Holder


a. Bahan
1.000 Bh Door Holder

b. Tenaga
0.050 Oh Pekerja
0.500 Oh Tukang Kayu
0.050 Oh Kepala Tukang
0.0025 Oh Mandor

Jumlah

1 m2 Pasang Kaca, Tebal 5 mm


a. Bahan
1.100 M2 Kaca Tebal 5 mm

b. Tenaga
0.015 Oh Pekerja
0.150 Oh Tukang Kayu/kaca
0.015 Oh Kepala Tukang
0.00075 Oh Mandor

Jumlah

1 m2 Pasang Kaca Buram, Tebal 12 mm


a. Bahan
1.100 M2 Kaca Buram
0.050 Kg Sealent

b. Tenaga
0.025 Oh Pekerja
0.250 Oh Tukang Kayu/kaca
0.025 Oh Kepala Tukang
0.00125 Oh Mandor

Jumlah

XIII PEKERJAAN PENUTUP LANTAI DAN DINDING

1 m3 Urugan Pasir
NO.
URAIAN
Analisa

1 2
a. Bahan
1.200 M3 Pasir Urug
NO.
URAIAN
Analisa

1 2
b. Tenaga
0.300 Oh Pekerja
- - Tukang Gali
- - Kepala Tukang
0.010 Oh Mandor

Jumlah

1 M2 Membuat Lantai Kerja Beton Tumbuk, 1 Pc : 3 Ps : 5 Kr, Tebal 5 cm


a. Bahan
10.000 Kg Semen Portland
0.026 M3 Pasir Beton
0.044 M3 Koral Beton

b. Tenaga
1.150 Oh Pekerja
0.020 Oh Tukang Batu
0.002 Oh Kepala Tukang
0.006 Oh Mandor

Jumlah
1 m2 Pasang Lantai Granito Ukuran 40 x 40 cm
a. Bahan
6.930 Bh Ubin Granito 40 x 40 cm
9.800 Kg Semen Portland
0.0215 M3 Pasir Pasang
1.300 Kg Semen Warna

b. Tenaga
0.250 Oh Pekerja
0.120 Oh Tukang Batu
0.012 Oh Kepala Tukang
0.0125 Oh Mandor

Jumlah

1 m' Pasang Dinding Porselin 10 x 10 cm, Warna


a. Bahan
100.000 Bh Porselin 11 x 11 cm warna/ setara disesuaikan
9.300 Kg Semen Portland
0.018 M3 Pasir Pasang
1.500 Kg Semen Warna

b. Tenaga
0.620 Oh Pekerja
0.500 Oh Tukang Batu
0.050 Oh Kepala Tukang
0.030 Oh Mandor

Jumlah
NO.
URAIAN
Analisa

1 2
1 m' Pasang Plint Ubin Granito Ukuran 10 x 40 cm
a. Bahan
2.650 Bh Plint Ubin Granito 10 x 40 cm
1.200 Kg Semen Portland
0.003 M3 Pasir Pasang
0.100 Kg Semen Warna

b. Tenaga
0.060 Oh Pekerja
0.030 Oh Tukang Batu
0.003 Oh Kepala Tukang
0.003 Oh Mandor

Jumlah

1 m2 Pasang Lantai Keramik Ukuran 20 x 20 cm


a. Bahan
25 Bh Ubin Keramik 20 x 20 cm
11.380 Kg Semen Portland
0.042 M3 Pasir Pasang
1.500 Kg Semen Warna

b. Tenaga
0.620 Oh Pekerja
0.350 Oh Tukang Batu
0.035 Oh Kepala Tukang
0.030 Oh Mandor

Jumlah

XIV PEKERJAAN SALURAN

1 M2 Pasangan Bata Lobang Tebal 1/2 Bata, 1 Pc : 4 Ps


a. Bahan
58.5 Bh Bata Lobang 9 x 9 x 19 cm
11.500 Kg Semen Portland
0.0430 M3 Pasir Pasang

b. Tenaga
0.320 Oh Pekerja
0.100 Oh Tukang Batu
0.010 Oh Kepala Tukang
0.015 Oh Mandor

Jumlah

Memasang 1 m' Pipa PVC Tipe AW Dia. 3/4"


a. Bahan
1.200 M' Pipa PVC
NO.
URAIAN
Analisa

1 2
Perlengkapan ( 35 % Harga Pipa Galvanis )

b. Tenaga
0.036 Oh Pekerja
0.060 Oh Tukang Batu
0.006 Oh Kepala Tukang
0.0018 Oh Mandor

Jumlah

Memasang 1 m' Pipa PVC Tipe AW Dia. 3"


a. Bahan
1.200 M' Pipa PVC
Perlengkapan ( 35 % Harga Pipa Galvanis )

b. Tenaga
0.081 Oh Pekerja
0.135 Oh Tukang Batu
0.0135 Oh Kepala Tukang
0.0041 Oh Mandor

Jumlah

Memasang 1 m' Pipa PVC Tipe AW Dia. 4"


a. Bahan
1.200 M' Pipa PVC
Perlengkapan ( 35 % Harga Pipa Galvanis )

b. Tenaga
0.081 Oh Pekerja
0.135 Oh Tukang Batu
0.0135 Oh Kepala Tukang
0.0041 Oh Mandor

Jumlah

XV PEKERJAAN PENGECATAN

1 m2 Pengecatan Bidang Kayu Baru ( 1 Lapis Plamir, 1 lapis Cat


Dasar, 2 Lapis Cat Penutup )
a. Bahan
0.200 Kg Cat Meni
0.150 Kg Plamir
0.170 Kg Cat Dasar
0.260 Kg Cat Penutup 2 Kali

b. Tenaga
0.070 Oh Pekerja
0.009 Oh Tukang Cat
NO.
URAIAN
Analisa

1 2
0.006 Oh Kepala Tukang
0.0025 Oh Mandor

Jumlah

1 m2 Pengecatan Tembok Baru ( 1 Lapis Plamir, 1 lapis Cat


Dasar, 2 Lapis Cat Penutup )
a. Bahan
NO.
URAIAN
Analisa

1 2
0.100 Kg Plamir
0.100 Kg Cat Dasar
0.260 Kg Cat Penutup 2 Kali, mutu C
0.260 Kg Cat Penutup 2 Kali, mutu B
0.260 Kg Cat Penutup 2 Kali, mutu B anti lumut/jamur
0.260 Kg Cat Penutup 2 Kali, mutu A anti lumut/jamur
Cat Mutu C
Cat Mutu B
Cat Mutu B, anti lumut/jamur
Cat Mutu A, anti lumut/jamur
b. Tenaga
0.020 Oh Pekerja
0.063 Oh Tukang Cat
0.0063 Oh Kepala Tukang
0.0025 Oh Mandor

Cat Tembok/plafond Mutu C


Cat tembok/plafond Mutu B
Cat tembok/plafond Mutu B, anti lumut/jamur
Cat tembok/plafond Mutu A, anti lumut/jamur

1 m2 Pengecatan Tembok Lama ( 1 lapis Cat Dasar, 2 Lapis cat


Penutup )
a. Bahan
0.120 Kg Cat Dasar
0.180 Kg Cat Penutup 2 Kali, mutu C
0.180 Kg Cat Penutup 2 Kali, mutu B
0.180 Kg Cat Penutup 2 Kali, Mutu B, anti lumut/jamur
Cat Mutu C
Cat Mutu B
Cat Mutu B, anti lumut/jamur

b. Tenaga
0.028 Oh Pekerja
0.042 Oh Tukang Cat
0.0042 Oh Kepala Tukang
0.0025 Oh Mandor

Cat Tembok/plafond Mutu C


Cat tembok/plafond Mutu B
Cat tembok/plafond Mutu B, anti lumut/jamur

1 m2 Pengecatan Permukaan Baja dengan Meni Besi


a. Bahan
0.100 Kg Meni Besi
0.010 Bh Kuas

b. Tenaga
0.020 Oh Pekerja
0.200 Oh Tukang Cat
0.020 Oh Kepala Tukang
0.010 Oh Mandor
NO.
URAIAN
Analisa

1 2

Jumlah

XVI PEKERJAAN INSTALASI LISTRIK GEDUNG

1 Titik Pemasangan Saklar Ganda


a. Bahan
3 btg Pipa listrik 5/8"
24 m' Kabel NYA 1,5 mm
3 Buah T Duss
4 Buah L Bow
3 Buah Las dop
1 Buah Saklar Ganda
24 Buah Klem biasa
1 Buah Mangkok
1 Buah Fitting

b. Upah
1.000 ls Tukang Instalasi listrik

Jumlah

1 Titik Pemasangan Saklar Tunggal


a. Bahan
3 btg Pipa listrik 5/8"
24 m' Kabel NYA 1,5 mm
3 Buah T Duss
4 Buah L Bow
3 Buah Las dop
1 Buah Saklar Tunggal
24 Buah Klem biasa
1 Buah Mangkok
1 Buah Fitting

b. Upah
1.000 ls Tukang Instalasi listrik

Jumlah

1 Titik Pemasangan Stop Kontak Biasa


a. Bahan
2 btg Pipa listrik 5/8"
15 m' Kabel NYA 2,5 mm
1 Buah T Duss
1 Buah L Bow
2 Buah Las dop
1 Buah Stop kontak biasa
16 Buah Klem biasa
1 Buah Mangkok
NO.
URAIAN
Analisa

1 2

b. Upah
1.000 ls Tukang Instalasi listrik

Jumlah
NO.
URAIAN
Analisa

1 2

1 Titik Pemasangan Stop Kontak AC


a. Bahan
25 m' Kabel NYM 2 X 2,5 mm
1 Buah Stop kontak AC
50 Buah Klem biasa

b. Upah
1.000 ls Tukang Instalasi listrik

Jumlah

1 Titik Pemasangan MCB


a. Bahan
3 btg Pipa listrik 5/8"
15 m' Kabel NYA 2,5 mm
1 Buah T Duss
2 Buah L Bow
24 Buah Klem biasa
1 Buah MCB

b. Upah
1.000 ls Tukang Instalasi listrik

Jumlah
A PEKERJAAN KOTA PALEMBANG
UN ANGGARAN 2019
SATUAN HARGA
Harga Jumlah Harga Jumlah Jumlah
Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
3 4 5 6

89,375.00 8,937.50 8,937.50


151,250.00 7,562.50 7,562.50
16,500.00 16,500.00

16,500.00 16,500.00

2,062,500.00 24,750.00 24,750.00


20,625.00 412.50 412.50
4,537,500.00 31,762.50 31,762.50
56,925.00 56,925.00

123,750.00 12,375.00 12,375.00


89,375.00 8,937.50 8,937.50
151,250.00 1,512.50 1,512.50
151,250.00 756.25 756.25
23,581.25 23,581.25

56,925.00 23,581.25 80,506.25

Err:509
Err:509
11,000.00 18,700.00 18,700.00
2,062,500.00 433,125.00 433,125.00
20,625.00 6,187.50 6,187.50
1,718.75 18,046.88 18,046.88
127,187.50 3,815.63 3,815.63
648,563.27 32,428.16 32,428.16
47,850.46 71,775.70 71,775.70
584,078.86 584,078.86
###
###
123,750.00 247,500.00 247,500.00
89,375.00 89,375.00 89,375.00
151,250.00 30,250.00 30,250.00
151,250.00 7,562.50 7,562.50
374,687.50 374,687.50

584,078.86 374,687.50 958,766.36


SATUAN HARGA
Harga Jumlah Harga Jumlah Jumlah
Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
3 4 5 6
Err:509
###
2,062,500 74,250.00 74,250.00
20,625.00 1,650.00 1,650.00
75,625.00 75,625.00 75,625.00
151,525.00 151,525.00
###
###
123,750.00 37,125.00 37,125.00
151,250.00 226.88 226.88
37,351.88 37,351.88

151,525.00 37,351.88 188,876.88

Err:509
Err:509
68,750.00 68,750.00 68,750.00
15,675.00 3,918.75 3,918.75
72,668.75 72,668.75
###
###
123,750.00 2,103.75 2,103.75
151,250.00 302.50 302.50
89,375.00 22,343.75 22,343.75
151,250.00 1,966.25 1,966.25
26,716.25 26,716.25

72,668.75 26,716.25 99,385.00

Err:509
Err:509
89,375.00 67,031.25 67,031.25
151,250.00 5,671.88 5,671.88
72,703.13 72,703.13

72,703.13 72,703.13
7,270.31 7,270.31

###
-
89,375.00 35,750.00 35,750.00
- - -
- - -
151,250.00 6,050.00 6,050.00
41,800.00 41,800.00

41,800.00 41,800.00
SATUAN HARGA
Harga Jumlah Harga Jumlah Jumlah
Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
3 4 5 6
###
-
89,375.00 47,011.25 47,011.25
- - -
- - -
151,250.00 7,865.00 7,865.00
54,876.25 54,876.25

54,876.25 54,876.25
###
-
89,375.00 17,160.00 17,160.00
- - -
- - -
151,250.00 2,873.75 2,873.75
20,033.75 20,033.75

20,033.75 20,033.75

###
-
89,375.00 44,687.50 44,687.50
- - -
- - -
151,250.00 7,562.50 7,562.50
52,250.00 52,250.00

52,250.00 52,250.00

###
###
89,375.00 107,250.00 107,250.00
107,250.00 107,250.00
###
-
89,375.00 26,812.50 26,812.50
- - -
- - -
151,250.00 1,512.50 1,512.50
28,325.00 28,325.00

107,250.00 28,325.00 135,575.00

Err:509
###
481,250.00 529,375.00 529,375.00
1,718.75 347,187.50 347,187.50
127,187.50 61,685.94 61,685.94
938,248.44 938,248.44
###
###
89,375.00 134,062.50 134,062.50
123,750.00 74,250.00 74,250.00
SATUAN HARGA
Harga Jumlah Harga Jumlah Jumlah
Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
3 4 5 6
151,250.00 9,075.00 9,075.00
151,250.00 11,343.75 11,343.75
228,731.25 228,731.25

938,248.44 228,731.25 1,166,979.69

996.88 779,556.25 779,556.25


85,937.50 173,937.50 173,937.50
127,187.50 51,638.13 51,638.13
1,005,131.88 1,005,131.88

123,750.00 74,250.00 74,250.00


151,250.00 9,075.00 9,075.00
89,375.00 134,062.50 134,062.50
151,250.00 11,343.75 11,343.75
228,731.25 228,731.25

1,005,131.88 228,731.25 1,233,863.13

996.88 58,317.19 58,317.19


1,718.75 32,570.31 32,570.31
127,187.50 4,833.13 4,833.13
95,720.63 95,720.63

89,375.00 28,600.00 28,600.00


123,750.00 12,375.00 12,375.00
151,250.00 1,512.50 1,512.50
151,250.00 2,268.75 2,268.75
44,756.25 44,756.25

95,720.63 44,756.25 140,476.88

996.88 58,317.19 58,317.19


1,718.75 19,765.63 19,765.63
127,187.50 5,469.06 5,469.06
83,551.88 83,551.88

89,375.00 28,600.00 28,600.00


123,750.00 12,375.00 12,375.00
151,250.00 1,512.50 1,512.50
151,250.00 2,268.75 2,268.75
44,756.25 44,756.25

83,551.88 44,756.25 128,308.13


SATUAN HARGA
Harga Jumlah Harga Jumlah Jumlah
Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
3 4 5 6

###
Err:509
1,718.75 14,643.75 14,643.75
127,187.50 2,162.19 2,162.19
16,805.94 16,805.94
###
###
89,375.00 17,875.00 17,875.00
123,750.00 18,562.50 18,562.50
151,250.00 2,268.75 2,268.75
151,250.00 1,512.50 1,512.50
40,218.75 40,218.75

16,805.94 40,218.75 57,024.69

###
Err:509
1,718.75 8,937.50 8,937.50
127,187.50 2,543.75 2,543.75
11,481.25 11,481.25
###
89,375.00 17,875.00 17,875.00
123,750.00 18,562.50 18,562.50
151,250.00 2,268.75 2,268.75
151,250.00 1,512.50 1,512.50
40,218.75 40,218.75

11,481.25 40,218.75 51,700.00

###
Err:509
1,718.75 7,425.00 7,425.00
127,187.50 2,035.00 2,035.00
9,460.00 9,460.00
###
89,375.00 22,343.75 22,343.75
123,750.00 12,375.00 12,375.00
151,250.00 1,512.50 1,512.50
151,250.00 2,268.75 2,268.75
38,500.00 38,500.00

9,460.00 38,500.00 47,960.00

###
Err:509
1,718.75 7,425.00 7,425.00
127,187.50 2,035.00 2,035.00
9,460.00 9,460.00
###
89,375.00 13,406.25 13,406.25
123,750.00 8,662.50 8,662.50
151,250.00 1,058.75 1,058.75
SATUAN HARGA
Harga Jumlah Harga Jumlah Jumlah
Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
3 4 5 6
151,250.00 1,210.00 1,210.00
24,337.50 24,337.50

9,460.00 24,337.50 33,797.50


Err:509
Err:509
85,937.50 909,906.25 909,906.25
127,187.50 137,362.50 137,362.50
1,047,268.75 1,047,268.75

1,047,268.75 1,047,268.75

Err:509
###
8,250,000.00 9,900,000.00 9,900,000.00
9,900,000.00 9,900,000.00
###
###
89,375.00 536,250.00 536,250.00
123,750.00 2,227,500.00 2,227,500.00
151,250.00 302,500.00 302,500.00
151,250.00 45,375.00 45,375.00
3,111,625.00 3,111,625.00

9,900,000.00 3,111,625.00 13,011,625.00

Err:509
###
8,250,000.00 330,000.00 330,000.00
330,000.00 330,000.00
###
###
89,375.00 89,375.00 89,375.00
123,750.00 309,375.00 309,375.00
151,250.00 37,812.50 37,812.50
151,250.00 7,562.50 7,562.50
444,125.00 444,125.00

330,000.00 444,125.00 774,125.00

Err:509
###
8,250,000.00 288,750.00 288,750.00
288,750.00 288,750.00
###
###
89,375.00 71,500.00 71,500.00
123,750.00 247,500.00 247,500.00
151,250.00 30,250.00 30,250.00
151,250.00 6,050.00 6,050.00
355,300.00 355,300.00
SATUAN HARGA
Harga Jumlah Harga Jumlah Jumlah
Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
3 4 5 6

288,750.00 355,300.00 644,050.00


SATUAN HARGA
Harga Jumlah Harga Jumlah Jumlah
Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
3 4 5 6

Err:509
###
8,250,000.00 528,000.00 528,000.00
528,000.00 528,000.00
###
###
89,375.00 89,375.00 89,375.00
123,750.00 371,250.00 371,250.00
151,250.00 45,375.00 45,375.00
151,250.00 75,625.00 75,625.00
581,625.00 581,625.00

528,000.00 581,625.00 1,109,625.00

625,000.00 625,000.00 625,000.00


13,750.00 13,750.00 13,750.00
30,937.50 30,937.50 30,937.50
669,687.50 669,687.50

81,250.00 81,250.00
81,250.00 81,250.00
669,687.50 81,250.00 750,937.50

Err:509
###
8,250,000.00 161,700.00 161,700.00
24,750.00 742.50 742.50
27,500.00 8,250.00 8,250.00
93,500.00 93,500.00 93,500.00
264,192.50 264,192.50
###
###
89,375.00 53,625.00 53,625.00
123,750.00 247,500.00 247,500.00
151,250.00 30,250.00 30,250.00
151,250.00 4,537.50 4,537.50
335,912.50 335,912.50
264,192.50 335,912.50 600,105.00

Err:509
Err:509
8,250,000.00 9,075,000.00 9,075,000.00
13,750.00 206,250.00 206,250.00
20,625.00 16,500.00 16,500.00
9,297,750.00 9,297,750.00
###
89,375.00 357,500.00 357,500.00
123,750.00 1,485,000.00 1,485,000.00
151,250.00 181,500.00 181,500.00
SATUAN HARGA
Harga Jumlah Harga Jumlah Jumlah
Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
3 4 5 6
151,250.00 30,250.00 30,250.00
2,054,250.00 2,054,250.00

9,297,750.00 2,054,250.00 11,352,000.00

Err:509

8,250,000.00 99,000.00 99,000.00


8,250,000.00 115,500.00 115,500.00
20,625.00 3,093.75 3,093.75
102,093.75 102,093.75
118,593.75 118,593.75
###
89,375.00 8,937.50 8,937.50
123,750.00 12,375.00 12,375.00
151,250.00 1,512.50 1,512.50
151,250.00 756.25 756.25
23,581.25 23,581.25
102,093.75 23,581.25 125,675.00
118,593.75 23,581.25 142,175.00

8,250,000.00 9,075,000.00 9,075,000.00


20,625.00 5,156.25 5,156.25
9,080,156.25 9,080,156.25

123,750.00 1,856,250.00 1,856,250.00


151,250.00 226,875.00 226,875.00
89,375.00 8,937.50 8,937.50
151,250.00 37,812.50 37,812.50
2,129,875.00 2,129,875.00

9,080,156.25 2,129,875.00 11,210,031.25


Err:509
###
6,600,000.00 151,800.00 151,800.00
16,500.00 2,475.00 2,475.00
154,275.00 154,275.00
###
71,500.00 14,300.00 14,300.00
99,000.00 29,700.00 29,700.00
121,000.00 3,630.00 3,630.00
121,000.00 1,210.00 1,210.00
48,840.00 48,840.00

154,275.00 48,840.00 203,115.00

Err:509
###
8,250,000.00 90,750.00 90,750.00
20,625.00 1,031.25 1,031.25
91,781.25 91,781.25
###
###
SATUAN HARGA
Harga Jumlah Harga Jumlah Jumlah
Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
3 4 5 6
89,375.00 9,831.25 9,831.25
123,750.00 27,225.00 27,225.00
151,250.00 3,327.50 3,327.50
SATUAN HARGA
Harga Jumlah Harga Jumlah Jumlah
Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
3 4 5 6
151,250.00 756.25 756.25
41,140.00 41,140.00

91,781.25 41,140.00 132,921.25

###
###
1,718.75 374,687.50 374,687.50
127,187.50 66,137.50 66,137.50
648,563.27 564,250.05 564,250.05
1,005,075.05 1,005,075.05
###
89,375.00 147,468.75 147,468.75
123,750.00 30,937.50 30,937.50
151,250.00 3,781.25 3,781.25
151,250.00 12,100.00 12,100.00
194,287.50 194,287.50

1,005,075.05 194,287.50 1,199,362.55

###
###
1,718.75 17,187.50 17,187.50
127,187.50 3,306.88 3,306.88
648,563.27 28,536.78 28,536.78
49,031.16 49,031.16
###
89,375.00 102,781.25 102,781.25
123,750.00 2,475.00 2,475.00
151,250.00 302.50 302.50
151,250.00 907.50 907.50
106,466.25 106,466.25

49,031.16 106,466.25 155,497.41

Err:509
###
2,062,500.00 412,500.00 412,500.00
20,625.00 30,937.50 30,937.50
26,125.00 3,396,250.00 3,396,250.00
24,750.00 55,687.50 55,687.50
1,718.75 555,156.25 555,156.25
127,187.50 66,137.50 66,137.50
648,563.27 505,879.35 505,879.35
5,022,548.10 5,022,548.10

###
89,375.00 348,562.50 348,562.50
123,750.00 43,312.50 43,312.50
123,750.00 128,700.00 128,700.00
123,750.00 129,937.50 129,937.50
151,250.00 37,056.25 37,056.25
SATUAN HARGA
Harga Jumlah Harga Jumlah Jumlah
Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
3 4 5 6
151,250.00 24,956.25 24,956.25
712,525.00 712,525.00

5,022,548.10 712,525.00 5,735,073.10

Err:509
###
2,062,500.00 556,875.00 556,875.00
20,625.00 41,250.00 41,250.00
26,125.00 3,657,500.00 3,657,500.00
24,750.00 74,250.00 74,250.00
1,718.75 555,156.25 555,156.25
127,187.50 66,137.50 66,137.50
648,563.27 505,879.35 505,879.35
5,457,048.10 5,457,048.10
###
###
89,375.00 433,468.75 433,468.75
123,750.00 43,312.50 43,312.50
123,750.00 193,050.00 193,050.00
123,750.00 173,250.00 173,250.00
151,250.00 50,063.75 50,063.75
151,250.00 25,712.50 25,712.50
918,857.50 918,857.50

5,457,048.10 918,857.50 6,375,905.60

1,730,643.75 -
1,730,643.75 1,730,643.75
412,500.00 1,730,643.75
412,500.00
3,873,787.50

2,062,500.00 825,000.00 825,000.00


20,625.00 82,500.00 82,500.00
26,125.00 3,657,500.00 3,657,500.00
24,750.00 111,375.00 111,375.00
1,718.75 398,750.00 398,750.00
127,187.50 66,137.50 66,137.50
648,563.27 505,879.35 505,879.35
2,062,500.00 309,375.00 309,375.00
11,000.00 220,000.00 220,000.00
6,176,516.85 6,176,516.85

89,375.00 652,437.50 652,437.50


123,750.00 43,312.50 43,312.50
123,750.00 408,375.00 408,375.00
123,750.00 259,875.00 259,875.00
SATUAN HARGA
Harga Jumlah Harga Jumlah Jumlah
Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
3 4 5 6
151,250.00 86,212.50 86,212.50
151,250.00 37,812.50 37,812.50
1,488,025.00 1,488,025.00

6,176,516.85 1,488,025.00 7,664,541.85

Err:509
###
2,062,500.00 660,000.00 660,000.00
20,625.00 66,000.00 66,000.00
26,125.00 5,225,000.00 5,225,000.00
24,750.00 74,250.00 74,250.00
1,718.75 398,750.00 398,750.00
SATUAN HARGA
Harga Jumlah Harga Jumlah Jumlah
Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
3 4 5 6
127,187.50 66,137.50 66,137.50
648,563.27 505,879.35 505,879.35
2,062,500.00 288,750.00 288,750.00
11,000.00 176,000.00 176,000.00
7,460,766.85 7,460,766.85
###
###
89,375.00 532,675.00 532,675.00
123,750.00 43,312.50 43,312.50
123,750.00 346,500.00 346,500.00
123,750.00 173,250.00 173,250.00
151,250.00 68,818.75 68,818.75
151,250.00 31,460.00 31,460.00
1,196,016.25 1,196,016.25

7,460,766.85 1,196,016.25 8,656,783.10

m + bekisting (kolom praktis) Err:509


###
2,062,500.00 4,125.00 4,125.00
20,625.00 206.25 206.25
26,125.00 78,375.00 78,375.00
24,750.00 11,137.50 11,137.50
1,718.75 6,875.00 6,875.00
127,187.50 763.13 763.13
648,563.27 5,837.07 5,837.07
107,318.94 107,318.94
###
89,375.00 5,362.50 5,362.50
123,750.00 2,475.00 2,475.00
123,750.00 2,475.00 2,475.00
123,750.00 2,475.00 2,475.00
151,250.00 907.50 907.50
151,250.00 453.75 453.75
14,148.75 14,148.75

107,318.94 14,148.75 121,467.69

###
###
2,062,500.00 82,500.00 82,500.00
20,625.00 8,250.00 8,250.00
2,062,500.00 30,937.50 30,937.50
93,500.00 32,725.00 32,725.00
11,000.00 66,000.00 66,000.00
220,412.50 220,412.50
###

89,375.00 28,600.00 28,600.00


123,750.00 40,837.50 40,837.50
151,250.00 4,991.25 4,991.25
151,250.00 907.50 907.50
75,336.25 75,336.25

220,412.50 75,336.25 295,748.75


SATUAN HARGA
Harga Jumlah Harga Jumlah Jumlah
Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
3 4 5 6

1,375.00 34,375.00 34,375.00


34,375.00 34,375.00

89,375.00 16,757.81 16,757.81


123,750.00 9,281.25 9,281.25
151,250.00 1,210.00 1,210.00
151,250.00 1,210.00 1,210.00
28,459.06 28,459.06

34,375.00 28,459.06 62,834.06

5,500.00 27,500.00 27,500.00


1,718.75 13,750.00 13,750.00
127,187.50 4,070.00 4,070.00
45,320.00 45,320.00

89,375.00 35,750.00 35,750.00


123,750.00 24,750.00 24,750.00
151,250.00 3,025.00 3,025.00
151,250.00 302.50 302.50
63,827.50 63,827.50

45,320.00 63,827.50 109,147.50


###

8,250,000.00 99,000.00 99,000.00


20,625.00 1,237.50 1,237.50
31,625.00 34,787.50
37,125.00 40,837.50 40,837.50
135,025.00 135,025.00
141,075.00 141,075.00

89,375.00 16,087.50 16,087.50


123,750.00 39,600.00 39,600.00
151,250.00 4,840.00 4,840.00
151,250.00 1,361.25 1,361.25
61,888.75 61,888.75

135,025.00 61,888.75 196,913.75


141,075.00 61,888.75 202,963.75
###
###
SATUAN HARGA
Harga Jumlah Harga Jumlah Jumlah
Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
3 4 5 6
###
###
2,578,125.00 2,578,125.00 2,578,125.00
154,687.50 154,687.50
SATUAN HARGA
Harga Jumlah Harga Jumlah Jumlah
Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
3 4 5 6
2,732,812.50 2,732,812.50

89,375.00 294,937.50 294,937.50


123,750.00 136,125.00 136,125.00
151,250.00 151.25 151.25
151,250.00 24,200.00 24,200.00
455,413.75 455,413.75
###
2,732,812.50 455,413.75 3,188,226.25
Err:509
###

618,750.00 618,750.00 618,750.00


74,250.00 74,250.00
1,718.75 10,312.50 10,312.50
127,187.50 1,271.88 1,271.88
704,584.38 704,584.38
###

89,375.00 107,250.00 107,250.00


123,750.00 179,437.50 179,437.50
151,250.00 22,687.50 22,687.50
151,250.00 15,125.00 15,125.00
324,500.00 324,500.00
###
704,584.38 324,500.00 1,029,084.38
###

247,500.00 247,500.00 247,500.00


1,718.75 10,312.50 10,312.50
127,187.50 1,271.88 1,271.88
259,084.38 259,084.38
###

89,375.00 187,687.50 187,687.50


123,750.00 92,812.50 92,812.50
151,250.00 10,587.50 10,587.50
151,250.00 16,637.50 16,637.50
307,725.00 307,725.00
###
259,084.38 307,725.00 566,809.38

###
247,500.00 247,500.00 247,500.00
44,550.00 44,550.00
292,050.00 292,050.00
###

89,375.00 160,875.00 160,875.00


123,750.00 334,125.00 334,125.00
151,250.00 81,675.00 81,675.00
151,250.00 16,637.50 16,637.50
SATUAN HARGA
Harga Jumlah Harga Jumlah Jumlah
Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
3 4 5 6
593,312.50 593,312.50
###
292,050.00 593,312.50 885,362.50
Err:509
###
###
704,000.00 281,600.00 281,600.00
1,718.75 206,250.00 206,250.00
127,187.50 38,156.25 38,156.25
962.50 346,500.00 346,500.00
16,500.00 99,000.00 99,000.00
971,506.25 971,506.25
###

89,375.00 536,250.00 536,250.00


123,750.00 371,250.00 371,250.00
151,250.00 45,375.00 45,375.00
151,250.00 45,375.00 45,375.00
998,250.00 998,250.00
###
971,506.25 998,250.00 1,969,756.25
Err:509
Err:509
###
###
704,000.00 176,000.00 176,000.00
1,718.75 132,343.75 132,343.75
127,187.50 16,534.38 16,534.38
550,000.00 11,000.00 11,000.00
26,125.00 67,925.00 67,925.00
127,187.50 11,446.88 11,446.88
415,250.00 415,250.00

89,375.00 126,912.50 126,912.50


123,750.00 58,533.75 58,533.75
151,250.00 7,108.75 7,108.75
151,250.00 10,738.75 10,738.75
203,293.75 203,293.75

415,250.00 203,293.75 618,543.75


###
###
###
7,562.50 9,075.00 9,075.00
2,646.88 2,646.88
11,721.88 11,721.88

89,375.00 3,217.50 3,217.50


123,750.00 7,425.00 7,425.00
121,000.00 726.00 726.00
151,250.00 272.25 272.25
11,640.75 11,640.75

11,721.88 11,640.75 23,362.63


SATUAN HARGA
Harga Jumlah Harga Jumlah Jumlah
Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
3 4 5 6
###
###
###
44,171.88 53,006.25 53,006.25
15,460.16 15,460.16
SATUAN HARGA
Harga Jumlah Harga Jumlah Jumlah
Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
3 4 5 6
68,466.41 68,466.41

89,375.00 7,239.38 7,239.38


123,750.00 16,706.25 16,706.25
151,250.00 2,041.88 2,041.88
151,250.00 620.13 620.13
26,607.63 26,607.63

68,466.41 26,607.63 95,074.03


###
###
###
71,500.00 85,800.00 85,800.00
25,025.00 25,025.00
110,825.00 110,825.00
###

89,375.00 7,239.38 7,239.38


123,750.00 16,706.25 16,706.25
151,250.00 2,041.88 2,041.88
151,250.00 620.13 620.13
26,607.63 26,607.63
Err:509
110,825.00 26,607.63 137,432.63

###
###
446,875.00 446,875.00 446,875.00
31,250.00 31,250.00 31,250.00
1,718.75 34,375.00 34,375.00
127,187.50 6,359.38 6,359.38
518,859.38 518,859.38

89,375.00 4,468.75 4,468.75


123,750.00 61,875.00 61,875.00
151,250.00 7,562.50 7,562.50
151,250.00 378.13 378.13
74,284.38 74,284.38

518,859.38 74,284.38 593,143.75


###
###
###
13,750.00 13,750.00 13,750.00
4,812.50 120.31 120.31
13,870.31 13,870.31
###

89,375.00 893.75 893.75


123,750.00 12,375.00 12,375.00
151,250.00 1,512.50 1,512.50
151,250.00 756.25 756.25
15,537.50 15,537.50
SATUAN HARGA
Harga Jumlah Harga Jumlah Jumlah
Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
3 4 5 6
13,870.31 15,537.50 29,407.81

41,800.00 438,900.00 438,900.00


20,033.75 52,588.59 52,588.59
399,238.13 3,353,600.25 3,353,600.25
1,499,203.18 449,760.96 449,760.96
57,024.69 769,833.28 769,833.28
4,825,166.85 965,033.37 965,033.37
25,000.00 25,000.00 25,000.00

###
648,563.27 486,422.45 486,422.45
127,187.50 127,187.50 127,187.50
71,500.00 286,000.00 286,000.00
93,750.00 187,500.00 187,500.00
12,375.00 123,750.00 123,750.00
7,265,576.40 7,265,576.40
Err:509
7,265,576.40 7,265,576.40

###
###
###
###
6,875.00 79,062.50 79,062.50
79,062.50 79,062.50
###

123,750.00 148,500.00 148,500.00


89,375.00 107,250.00 107,250.00
151,250.00 1,815.00 1,815.00
151,250.00 90.75 90.75
257,655.75 257,655.75
###
79,062.50 257,655.75 336,718.25

###
###
24,750.00 27,225.00 27,225.00
24,750.00 495.00 495.00
4,537,500.00 8,167.50 8,167.50
35,887.50 35,887.50

89,375.00 8,937.50 8,937.50


123,750.00 12,375.00 12,375.00
151,250.00 1,512.50 1,512.50
151,250.00 75.63 75.63
22,900.63 22,900.63

35,887.50 22,900.63 58,788.13


###
###
SATUAN HARGA
Harga Jumlah Harga Jumlah Jumlah
Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
3 4 5 6
###
###
123,750.00 123,750.00 123,750.00
123,750.00 123,750.00
SATUAN HARGA
Harga Jumlah Harga Jumlah Jumlah
Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
3 4 5 6
###

89,375.00 5,362.50 5,362.50


123,750.00 74,250.00 74,250.00
151,250.00 9,075.00 9,075.00
151,250.00 453.75 453.75
89,141.25 89,141.25

123,750.00 89,141.25 212,891.25


###
###
###
###
###
24,750.00 24,750.00 24,750.00
24,750.00 24,750.00
###

89,375.00 1,340.63 1,340.63


123,750.00 18,562.50 18,562.50
151,250.00 2,268.75 2,268.75
151,250.00 113.44 113.44
22,285.31 22,285.31
###
24,750.00 22,285.31 47,035.31
###
###
###
41,250.00 41,250.00 41,250.00
41,250.00 41,250.00
###
89,375.00 893.75 893.75
123,750.00 12,375.00 12,375.00
151,250.00 1,512.50 1,512.50
151,250.00 75.63 75.63
14,856.88 14,856.88
###
41,250.00 14,856.88 56,106.88
###
###
###
83,875.00 83,875.00 83,875.00
83,875.00 83,875.00

89,375.00 1,340.63 1,340.63


123,750.00 18,562.50 18,562.50
151,250.00 2,268.75 2,268.75
151,250.00 113.44 113.44
22,285.31 22,285.31
###
83,875.00 22,285.31 106,160.31
###
###
###
17,875.00 17,875.00 17,875.00
SATUAN HARGA
Harga Jumlah Harga Jumlah Jumlah
Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
3 4 5 6
17,875.00 17,875.00

89,375.00 1,787.50 1,787.50


123,750.00 24,750.00 24,750.00
151,250.00 3,025.00 3,025.00
151,250.00 151.25 151.25
29,713.75 29,713.75
###
17,875.00 29,713.75 47,588.75
###
###
###
41,250.00 41,250.00 41,250.00
41,250.00 41,250.00

89,375.00 4,468.75 4,468.75


123,750.00 61,875.00 61,875.00
151,250.00 7,562.50 7,562.50
151,250.00 378.13 378.13
74,284.38 74,284.38

41,250.00 74,284.38 115,534.38


###
###
###
151,250.00 166,375.00 166,375.00
166,375.00 166,375.00
###
###
89,375.00 1,340.63 1,340.63
123,750.00 18,562.50 18,562.50
151,250.00 2,268.75 2,268.75
151,250.00 113.44 113.44
22,285.31 22,285.31

166,375.00 22,285.31 188,660.31


###
###
###
536,250.00 589,875.00 589,875.00
56,250.00 2,812.50 2,812.50
592,687.50 592,687.50
###

89,375.00 2,234.38 2,234.38


123,750.00 30,937.50 30,937.50
151,250.00 3,781.25 3,781.25
151,250.00 189.06 189.06
37,142.19 37,142.19
###
592,687.50 37,142.19 629,829.69
Err:509
###
SATUAN HARGA
Harga Jumlah Harga Jumlah Jumlah
Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
3 4 5 6

89,375.00 107,250.00 107,250.00


107,250.00 107,250.00
SATUAN HARGA
Harga Jumlah Harga Jumlah Jumlah
Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
3 4 5 6

89,375.00 26,812.50 26,812.50


- - -
- - -
151,250.00 1,512.50 1,512.50
28,325.00 28,325.00

107,250.00 28,325.00 135,575.00

1,718.75 17,187.50 17,187.50


127,187.50 3,306.88 3,306.88
648,563.28 28,536.78 28,536.78
49,031.16 49,031.16

89,375.00 102,781.25 102,781.25


123,750.00 2,475.00 2,475.00
151,250.00 302.50 302.50
151,250.00 907.50 907.50
106,466.25 106,466.25

49,031.16 106,466.25 155,497.41


###
###
60,500.00 419,265.00 419,265.00
1,718.75 16,843.75 16,843.75
127,187.50 2,734.53 2,734.53
16,500.00 21,450.00 21,450.00
460,293.28 460,293.28

89,375.00 22,343.75 22,343.75


123,750.00 14,850.00 14,850.00
151,250.00 1,815.00 1,815.00
151,250.00 1,890.63 1,890.63
40,899.38 40,899.38
Err:509
460,293.28 40,899.38 501,192.66
###

1,250.00 125,000.00 125,000.00


1,562.50 14,531.25 14,531.25
115,625.00 2,081.25 2,081.25
15,000.00 22,500.00 22,500.00
164,112.50 164,112.50

89,375.00 55,412.50 55,412.50


123,750.00 61,875.00 61,875.00
151,250.00 7,562.50 7,562.50
151,250.00 4,537.50 4,537.50
129,387.50 129,387.50

164,112.50 129,387.50 293,500.00


SATUAN HARGA
Harga Jumlah Harga Jumlah Jumlah
Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
3 4 5 6

15,125.00 40,081.25 40,081.25


1,718.75 2,062.50 2,062.50
127,187.50 381.56 381.56
16,500.00 1,650.00 1,650.00
44,175.31 44,175.31

###
89,375.00 5,362.50 5,362.50
123,750.00 3,712.50 3,712.50
151,250.00 453.75 453.75
151,250.00 453.75 453.75
9,982.50 9,982.50
Err:509
44,175.31 9,982.50 54,157.81
###

2,860.00 71,500.00 71,500.00


1,718.75 19,559.38 19,559.38
127,187.50 5,341.88 5,341.88
16,500.00 24,750.00 24,750.00
121,151.25 121,151.25

89,375.00 55,412.50 55,412.50


123,750.00 43,312.50 43,312.50
151,250.00 5,293.75 5,293.75
151,250.00 4,537.50 4,537.50
108,556.25 108,556.25

121,151.25 108,556.25 229,707.50

996.88 58,317.19 58,317.19


1,718.75 19,765.63 19,765.63
127,187.50 5,469.06 5,469.06
83,551.88 83,551.88

89,375.00 28,600.00 28,600.00


123,750.00 12,375.00 12,375.00
151,250.00 1,512.50 1,512.50
151,250.00 2,268.75 2,268.75
44,756.25 44,756.25

83,551.88 44,756.25 128,308.13

7,562.50 9,075.00 9,075.00


SATUAN HARGA
Harga Jumlah Harga Jumlah Jumlah
Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
3 4 5 6
2,646.88 2,646.88
11,721.88 11,721.88

89,375.00 3,217.50 3,217.50


123,750.00 7,425.00 7,425.00
151,250.00 907.50 907.50
151,250.00 272.25 272.25
11,822.25 11,822.25

11,721.88 11,822.25 23,544.13

44,171.88 53,006.25 53,006.25


15,460.16 15,460.16
68,466.41 68,466.41

89,375.00 7,239.38 7,239.38


123,750.00 16,706.25 16,706.25
151,250.00 2,041.88 2,041.88
151,250.00 620.13 620.13
26,607.63 26,607.63

68,466.41 26,607.63 95,074.03

71,500.00 85,800.00 85,800.00


25,025.00 25,025.00
110,825.00 23,945.63

89,375.00 7,239.38 7,239.38


123,750.00 16,706.25 16,706.25
151,250.00 2,041.88 2,041.88
151,250.00 620.13 620.13
26,607.63 26,607.63

110,825.00 26,607.63 137,432.63

###
###
###
###
50,875.00 10,175.00 10,175.00
23,375.00 3,506.25 3,506.25
44,000.00 7,480.00 7,480.00
112,750.00 29,315.00 29,315.00
50,476.25 50,476.25
###
89,375.00 6,256.25 6,256.25
123,750.00 1,113.75 1,113.75
SATUAN HARGA
Harga Jumlah Harga Jumlah Jumlah
Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
3 4 5 6
151,250.00 907.50 907.50
151,250.00 378.13 378.13
8,655.63 8,655.63
50,476.25 8,655.63 59,131.88
###
###
SATUAN HARGA
Harga Jumlah Harga Jumlah Jumlah
Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
3 4 5 6
11,000.00 1,100.00 1,100.00
44,000.00 4,400.00 4,400.00
17,187.50 4,468.75 4,468.75
35,750.00 9,295.00 9,295.00
37,812.50 9,831.25 9,831.25
130,625.00 33,962.50 33,962.50
9,968.75 9,968.75
14,795.00 14,795.00
15,331.25 15,331.25
39,462.50 39,462.50

89,375.00 1,787.50 1,787.50


123,750.00 7,796.25 7,796.25
151,250.00 952.88 952.88
151,250.00 378.13 378.13
10,914.75 10,914.75

9,968.75 10,914.75 20,883.50


14,795.00 10,914.75 25,709.75
15,331.25 10,914.75 26,246.00
39,462.50 10,914.75 50,377.25

###
44,000.00 5,280.00 5,280.00
17,187.50 3,093.75 3,093.75
35,750.00 6,435.00 6,435.00
37,812.50 6,806.25 6,806.25
8,373.75 8,373.75
12,086.25 12,086.25
11,467.50 11,467.50

89,375.00 2,502.50 2,502.50


123,750.00 5,197.50 5,197.50
151,250.00 635.25 635.25
151,250.00 378.13 378.13
8,713.38 8,713.38

8,373.75 8,713.38 17,087.13


12,086.25 8,713.38 20,799.63
11,467.50 8,713.38 20,180.88
###
###
###
57,750.00 5,775.00 5,775.00
17,187.50 171.88 171.88
5,946.88 5,946.88

89,375.00 1,787.50 1,787.50


123,750.00 24,750.00 24,750.00
151,250.00 3,025.00 3,025.00
151,250.00 1,512.50 1,512.50
SATUAN HARGA
Harga Jumlah Harga Jumlah Jumlah
Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
3 4 5 6
31,075.00 31,075.00

5,946.88 31,075.00 37,021.88

8,250.00 24,750.00 24,750.00


5,362.50 128,700.00 128,700.00
1,650.00 4,950.00 4,950.00
3,437.50 13,750.00 13,750.00
687.50 2,062.50 2,062.50
18,562.50 18,562.50 18,562.50
192.50 4,620.00 4,620.00
2,475.00 2,475.00 2,475.00
12,375.00 12,375.00 12,375.00
212,245.00 212,245.00

116,875.00 116,875.00 116,875.00


116,875.00 116,875.00

212,245.00 116,875.00 329,120.00

8,250.00 24,750.00 24,750.00


5,362.50 128,700.00 128,700.00
1,650.00 4,950.00 4,950.00
3,437.50 13,750.00 13,750.00
687.50 2,062.50 2,062.50
8,250.00 8,250.00 8,250.00
192.50 4,620.00 4,620.00
2,475.00 2,475.00 2,475.00
12,375.00 12,375.00 12,375.00
201,932.50 201,932.50

116,875.00 116,875.00 116,875.00


116,875.00 116,875.00

201,932.50 116,875.00 318,807.50

8,250.00 16,500.00 16,500.00


7,150.00 107,250.00 107,250.00
1,650.00 1,650.00 1,650.00
3,437.50 3,437.50 3,437.50
687.50 1,375.00 1,375.00
8,250.00 8,250.00 8,250.00
192.50 3,080.00 3,080.00
2,475.00 2,475.00 2,475.00
144,017.50 144,017.50
SATUAN HARGA
Harga Jumlah Harga Jumlah Jumlah
Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
3 4 5 6

116,875.00 116,875.00 116,875.00


116,875.00 116,875.00

144,017.50 116,875.00 260,892.50


SATUAN HARGA
Harga Jumlah Harga Jumlah Jumlah
Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
3 4 5 6

17,875.00 446,875.00 446,875.00


103,125.00 103,125.00 103,125.00
192.50 9,625.00 9,625.00
559,625.00 559,625.00

116,875.00 116,875.00 116,875.00


116,875.00 116,875.00

559,625.00 116,875.00 676,500.00

8,250.00 24,750.00 24,750.00


7,150.00 107,250.00 107,250.00
1,650.00 1,650.00 1,650.00
3,437.50 6,875.00 6,875.00
192.50 4,620.00 4,620.00
60,500.00 60,500.00 60,500.00
205,645.00 205,645.00

116,875.00 116,875.00 116,875.00


116,875.00 116,875.00

205,645.00 116,875.00 322,520.00


DAFTAR HARGA SATUAN UPAH, BAHAN DAN PERALA

HRG SATUAN
NO URAIAN SATUAN
(RUPIAH)
A UPAH
1 Kepala Tukang Oh 151,250.00
2 Tukang Oh 123,750.00
3 Mandor Oh 151,250.00
4 Pekerja Tidak Terlatih Oh 89,375.00
5 Pekerja Terlatih Oh 103,125.00
6 Masinis Oh 103,125.00
7 Operator Oh 206,250.00
8 Sopir Oh 137,500.00
9 Pembantu Masinis/Operator Oh 103,125.00
10 Supervisor Oh 103,125.00
11 Pemasak Aspal Oh 61,875.00
12 Penjaga Oh 55,000.00
13 Pembantu Sopir Oh 103,125.00
14 Mekanik Oh 185,625.00
15 Surveyor Oh 103,125.00

B BAHAN/MATERIAL
1 Agregat Halus m3 648,563.27
2 Agregat Kasar m3 648,563.27
3 Agregat Kelas A m3 350,625.00
4 Agregat Kelas B m3 309,375.00
5 Agregat Kelas C m3 295,625.00
6 Aluminium Foil m2 25,437.50
7 Amplas Biasa Lbr 4,812.50
8 Amplas Niken Lbr 8,937.50
9 Atap Aluminium Zink Coated (seng) tebal 0,25 mm Lbr 59,125.00
10 Atap Aluminium Zink Coated (seng) tebal 0,3 mm Lbr 82,500.00
11 Atap Aluminium Zink Coated (seng) tebal 0,4 mm Lbr 114,125.00
12 Atap Aluminium Zincalume, tebal 0,25 mm Lbr 85,250.00
13 Atap Aluminium Zincalume, tebal 0,3 mm Lbr 85,937.50
14 Atap Aluminium Zincalume, tebal 0,4 mm Lbr 104,500.00
15 Atap Aluminium Gelombang tebal 0,5 mm Lbr 137,500.00
16 Atap Fiber warna"Polycarbonat" tbl. 4-5 mm m2 110,000.00
17 Atap Genteng Beton Lokal buah 5,775.00
18 Atap Genteng Beton buah 7,837.50
19 Atap Genteng Beton Cisangkan buah 10,312.50
20 Atap Genteng Buleleng buah 3,162.50
21 Atap Genteng Keramik biasa berglazur buah 11,000.00
22 Atap Genteng Keramik KIA Berglazur Natural buah 16,500.00
23 Atap Genteng Keramik KIA/sejenis Berglazur warna buah 23,375.00
24 Atap Genteng Metal Biasa (88 cm X 77 cm) m2 50,875.00
25 Atap Genteng Metal Warna (120 cm X 76 cm) m2 55,000.00
26 Atap Genteng Metal Zincalume 2x4 (38,5 cm X 80c m2 220,000.00
27 Atap Genteng Metal Zincalume berpasir (77cmX10 m2 116,875.00
HRG SATUAN
NO URAIAN SATUAN
(RUPIAH)
28 Atap Genteng Metal Zincalume berpasir biasa m2 82,500.00
29 Atap Genteng Kodok buah 1,375.00
30 Atap Genteng Palentong buah 93,500.00
30 Atap Genteng Palentong Super buah 33,000.00
31 Atap Onduline m2 34,375.00
31 Asbes polos 100 x 100 tbl = 4 mm Lbr 44,000.00
32 Asbes Gelombang Kecil, lebar 80 cm m2 48,125.00
33 Asbes Gelombang Kecil, lebar 105 cm m2 46,062.50
34 Asbes Gelombang Besar, lebar 105 cm m2 48,125.00
35 Asbes Gelombang motif genteng m2 46,062.50
36 Aspal curah kg 16,500.00
37 Aspal drum kg 16,500.00
38 Aquaproof kg 357,500.00
39 Bak Cuci Stainless Steel buah 265,375.00
40 Bak Cuci Teraso buah 446,875.00
41 Bak Fibreglass buah 247,500.00
42 Bak Teraso buah 247,500.00
43 Bambu dia. 6-8 cm/6m Btg 68,750.00
44 Batako buah 3,575.00
45 Batu Andesit hitam kecoklatan m2 261,250.00
46 Batu alam kecoklatan (Sangarong) m2 254,375.00
47 Batu Bata lobang m3 704,000.00
48 Batu Bata Kecil buah 1,718.75
49 Batu Bata Lobang buah 996.88
50 Batu Candi hitam m2 309,375.00
51 Batu Kali m3 481,250.00
52 Batu Kali tempel m2 127,875.00
53 Batu Karang Pilang m2 816,750.00
54 Batu Kerikil m3 550,000.00
55 Batu Koral beton m3 648,563.27
56 Batu Koral Jagung m3 648,563.27
57 Batu Krokos m3 481,250.00
HRG SATUAN
NO URAIAN SATUAN
(RUPIAH)
58 Batu Palimanan kuning/hijau m2 231,000.00
59 Batu Palimanan kuning/hijau + bevel m2 231,000.00
60 Batu Pecah 0.5 - 1 (screen) m3 350,625.00
61 Batu Abu 0.00 - 0.5 (filler) m3 336,875.00
62 Batu Pecah 1.3 - 1.9 (spilt) m3 333,437.50
63 Batu Pecah 2/3 m3 323,125.00
64 Batu Pecah 3/5 m3 309,375.00
65 Batu Pecah 5/7 m3 295,625.00
66 Batu Marmer m2 378,125.00
67 Batu Roster / Terawang buah 5,843.75
68 Besi dia. 5 mm Batang 30,250.00
69 Besi dia. 6 mm KS Batang 34,375.00
70 Besi dia. 8 mm KS TI Batang 70,125.00
71 Besi dia. 10 mm KS TI Batang 110,000.00
72 Besi dia. 12 mm KS TI Batang 151,250.00
73 Besi dia. 14 mm KS TI Batang 254,375.00
74 Besi dia. 16 mm KS TI Batang 268,125.00
75 Besi dia. 19 mm KS TI Batang 378,125.00
76 Besi Beton Polos kg 26,125.00
77 Besi Baja Profil WF, I dan H kg 23,375.00
78 Besi Baja Konstruksi ( CNP, INP,dan besi L) kg 20,625.00
79 Besi Beam Clamp dan Plat Siku m2 30,937.50
80 Besi Hollow baja 20 X 40, tb. 2mm Batang 192,500.00
81 Besi Hollow baja 40 X 40, tb. 2mm Batang 220,000.00
82 Besi Hollow baja 30 X 60, tb. 2mm Batang 261,250.00
83 Besi Hollow Plafond 2 X 4 Batang 34,375.00
84 Besi Strip kg 13,750.00
85 Besi Strip 2 X 3 M' 6,875.00
86 Beton Ready Mix K - 125 m3 1,100,000.00
87 Beton Ready Mix K - 175 m3 1,168,750.00
88 Beton Ready Mix K - 225 m3 1,237,500.00
89 Beton Ready Mix K - 250 m3 1,306,250.00
90 Beton Ready Mix K - 275 m3 1,375,000.00
91 Beton Ready Mix K - 300 m3 1,443,750.00
92 Beton Ready Mix K - 350 m3 1,375,000.00
93 Beton Ready Mix K - 400 m3 1,581,250.00
94 Bubungan Asbes Gelombang Besar m' 33,000.00
95 Bubungan Asbes Gelombang Kecil m' 32,312.50
96 Bubungan/Nok Genteng Beton Buah 8,250.00
97 Bubungan Genteng Buleleng Buah 7,150.00
98 Bubungan/ Nok genteng Keramik biasa berglazur Buah 13,750.00
99 Bubungan/Nok gentengKeramik KIA/sejenis berglaz Buah 27,500.00
100 Bubungan gtg Keramik KIA/sejenis warna berglazur Buah 34,375.00
101 Bubungan/Nok Genteng Metal/aluminium M' 41,250.00
102 Bubungan Genteng Kodok Buah 5,500.00
103 Bubungan Genteng Palentong kecil Buah 44,000.00
104 Bubungan Genteng Palentong besar Buah 34,375.00
105 Cat Dasar kg 44,000.00
106 Cat Antara kg 34,375.00
HRG SATUAN
NO URAIAN SATUAN
(RUPIAH)
107 Cat Kayu dan Besi Anti Rayap kg 61,875.00
108 Cat Khusus Glossy dan Quick Drying kg 41,250.00
109 Cat Minyak warna (biasa) mutu C kg 55,000.00
110 Cat Minyak mutu B kg 66,000.00
111 Cat Minyak Semprot kg 57,750.00
112 Cat Meni Besi kg 50,875.00
113 Cat Meni Besi /kayu/ Flincote kg 57,750.00
114 Cat Penutup kg 112,750.00
115 Cat Tembok mutu C (Vinotex,Q-Luc, dan sejenis) kg 17,187.50
116 Cat Tembok mutu B (Catylax,vinilex, dan sejenis) kg 35,750.00
117 Cat Tembok mutu B, Anti Lumut dan Jamur kg 37,812.50
118 Cat Tembok mutu A (Mowilex,Kemtone,Dulux,dll) kg 130,625.00
119 Closed Duduk Setara KIA unit 756,250.00
120 Closed Duduk Ex TOTO C 721 FV 1 Standar unit 3,093,750.00
121 Closed Duduk Halmar unit 4,400,000.00
122 Closed Duduk Toto C 704 unit 2,578,125.00
123 Closed Duduk Toto C 406 unit 6,050,000.00
124 Closed Duduk Toto CW 867 J unit 3,740,000.00
125 Closed Duduk TV 150 NS unit 3,162,500.00
126 Closet Duduk / Monoblok bh 742,500.00
127 Closet Jongkok Porselen / biasa buah 220,000.00
128 Closet Jongkok Teraso buah 44,000.00
129 Closed Jongkok KIA Standart / sejenis (mutu B) unit 247,500.00
130 Closed Jongkok KIA Amerika / sejenis ( mutu A) Unit 371,250.00
131 Shower Spray TX 403 SV 3 buah 446,875.00
132 Coneblock biasa tebal 6 cm buah 2,475.00
133 Coneblock warna tebal 6 cm buah 3,300.00
134 Coneblock biasa tebal 8 cm buah 3,368.75
135 Coneblock warna tebal 8 cm buah 4,125.00
136 Cornice (bubuk Semen putih utk gypsum) kg 9,625.00
137 Dempul Jadi kg 27,500.00
HRG SATUAN
NO URAIAN SATUAN
(RUPIAH)
138 Dempul Ross Polac kg 38,500.00
139 Dempul Isamu kg 66,000.00
140 Dolken Kayu dia. 8 - 10/400 cm m3 398,750.00
141 Door Closer buah 330,000.00
142 Door Holder buah 41,250.00
143 Door Stoper buah 41,250.00
144 Door Stop buah 30,250.00
145 Ember hitam buah 8,937.50
146 Engsel Biasa buah 24,750.00
147 Engsel Kuningan 4" buah 41,250.00
148 Engsel Pintu buah 24,750.00
149 Epoxi kg 68,750.00
150 Eternit 100 x 100 tebal 2,7 mm m2 31,625.00
151 Eternit 100 x 100 tebal 3,5 mm m2 37,125.00
152 Filler m3 1,718.75
153 Fitting plafond listrik buah 12,375.00
154 Glass Block buah 33,000.00
155 Grendel/Slot Tanam 4" buah 103,125.00
156 Grendel biasa buah 22,000.00
157 Gypsum Board ( 120 x 240 x 9 ) mm lbr 93,500.00
158 Hordeng Horizontal Blind (aluminium) m2 126,500.00
159 Hordeng Vertikal Blind m3 130,625.00
160 Ijuk Kg 12,375.00
161 Jendela Aluminium + Kaca Reyband 5 mm m2 1,127,500.00
162 Jendela Besi m2 412,500.00
163 Jendela Bingkai Nako 100 cm X 70 cm Unit 123,750.00
164 Jendela Bingkai Nako m2 185,625.00
165 Kabel NYA1,5 mm m' 5,362.50
166 Kabel NYA 2,5 mm m' 7,150.00
167 Kabel NYA 4.0 mm m' 8,250.00
168 Kabel NYM 2 X 1,5 mm m' 13,750.00
169 Kabel NYM 2 X 2,5 mm m' 17,875.00
170 Kabel NYM 2 X 4,0 mm m' 24,750.00
171 Kaca Cermin 3 mm m2 170,500.00
172 Kaca Cermin 5 mm m2 265,375.00
173 Kaca Patri m2 2,200,000.00
174 Kaca Bening 3 mm m2 89,375.00
175 Kaca Bening 4 mm m2 103,125.00
176 Kaca Bening 5 mm m2 151,250.00
177 Kaca Bening 8 mm m2 275,000.00
178 Kaca Buram 12 mm m2 536,250.00
179 Kaca Rayband 5 mm m2 137,500.00
180 Kaca Buram/Es 5 mm m2 148,500.00
181 Bingkai Kaca Nako Set 19,250.00
182 Kaca Naco 6 daun Set 74,250.00
183 Kaca Naco 8 daun Set 85,250.00
184 Kaca Naco Rayben 5 mm, 6 daun Set 74,250.00
185 Kaca Naco Rayben 5 mm, 8 daun Set 83,875.00
186 Kait angin Jendela Buah 20,625.00
HRG SATUAN
NO URAIAN SATUAN
(RUPIAH)
187 Kalsiboard 3,5 mm (120 cm X 240 cm) Kpg 75,625.00
188 Kalsiboard 4,5 mm (120 cm X 240 cm) Kpg 79,750.00
189 Kapur kg 8,937.50
190 Karpet tebal 6 mm m2 103,125.00
191 Kawat Beton kg 24,750.00
192 Kawat Burung m2 27,500.00
193 Kawat Duri m' 20,625.00
194 Kawat Harmonika m2 53,625.00
195 Kawat Jaring pagar lbr 38,500.00
196 Kawat Kassa m2 20,625.00
197 Kawat Las Dos 137,500.00
198 Kawat Nyamuk m2 24,750.00
199 Kawat Seng Polos kg 26,125.00
200 Kayu Gelam dia. 6-8 btg 11,000.00
201 Kayu Gelam dia. 10-12 btg 12,375.00
202 Kayu Hek btg 12,375.00
203 Kayu Lis 1/3 m' 14,437.50
204 Kayu Lis 1/4 m' 15,812.50
205 Kayu Lis Profil kecil m' 3,437.50
206 Kayu Lis Profil sedang m' 4,812.50
207 Kayu Lis Profil besar m' 10,312.50
208 Kayu Mosaik 30 x 30 cm Buah 8,593.75
209 Kayu Kaso 5/7 kelas III Btg 75,625.00
210 Kayu Kelas I (Unglen, Jati) m3 11,343,750.00
211 Kayu Kelas II m3 8,250,000.00
212 Kayu Kelas III m3 4,537,500.00
213 Kayu Papan 3/20 Kls. III m3 4,537,500.00
214 Kayu Kelas IV m3 2,062,500.00
215 Kayu Papan kelas IV keping 22,687.50
216 Kayu Racuk m3 2,268,750.00
217 Kayu Reng btg 41,250.00
HRG SATUAN
NO URAIAN SATUAN
(RUPIAH)
218 Keramik lantai/dinding 20 x 20/25 cm putih polos Kotak 79,750.00
Keramik lantai/dinding 20 x 20/25 cm putih polos buah 3,190.00
219 Keramik lantai 20 x 20 cm warna, mutu C Kotak 71,500.00
Keramik lantai 20 x 20 cm warna, mutu C buah 2,860.00
220 Keramik lantai 20 x 20 cm warna, mutu B Kotak 85,250.00
Keramik lantai 20 x 20 cm warna, mutu B buah 3,410.00
221 Keramik dinding 20 x 25 cm warna Kotak 93,500.00
Keramik dinding 20 x 25 cm warna buah 4,675.00
222 Keramik lantai 20 x 25 cm warna, mutu B Kotak 64,075.00
Keramik lantai 20 x 25 cm warna, mutu B buah 3,203.75
223 Keramik lantai 30 x 30 cm warna Kotak 66,000.00
Keramik lantai 30 x 30 cm warna buah 5,940.59
224 Keramik lantai 30 x 30 cm putih polos Kotak 66,000.00
Keramik lantai 30 x 30 cm putih polos buah 5,940.59
225 Keramik lantai 40 x 40 cm warna mutu C Kotak 71,500.00
Keramik lantai 40 x 40 cm warna mutu C buah 11,440.00
226 Keramik lantai 40 x 40 cm warna mutu B Kotak 89,375.00
Keramik lantai 40 x 40 cm warna mutu B buah 14,300.00
227 Keramik lantai motif kayu (kasar) mutu A Kotak 68,750.00
228 Klem Talang Paralon Buah 3,781.25
229 Klem kabel listrik biasa Buah 192.50
230 Klem kabel listrik Buah 4,125.00
231 Korosin Ltr 2,750.00
232 Kran Air buah 13,750.00
233 Kuas 3"-4" buah 17,187.50
234 Kunci Gembok buah 11,687.50
235 Kunci Lemari buah 11,000.00
236 Kunci Pintu Kamar Tidur (Hotel) buah 550,000.00
237 Kunci Pintu KM/WC (lux) buah 481,250.00
238 Kunci Selot buah 17,875.00
239 Kunci Tanam biasa mutu C buah 34,375.00
240 Kunci Tanam 2 slaag biasa buah 89,375.00
241 Kunci Tanam 2 slaag mutu B buah 123,750.00
242 Kunci Tanam Kamar Mandi buah 37,125.00
243 L.bow listrik buah 3,437.50
244 Lampu Down Light buah 58,437.50
245 Lampu Hologen 50 watt buah 17,187.50
246 Lampu Hologen 150 watt buah 34,375.00
247 Lampu Hologen Box buah 137,500.00
248 Lampu TL 10 Watt buah 9,625.00
249 Lampu TL 20 Watt buah 13,750.00
250 Lampu TL 40 Watt (bambu) buah 144,375.00
251 Lampu Pijar 25 Watt Putih buah 6,875.00
252 Lampu Pijar 40 Watt Putih buah 7,562.50
253 Lantai Granit 30/30 Buah 28,187.50
254 Lantai Granit 40/40 Buah 60,500.00
255 Lantai Granit 60/60 Buah 160,875.00
256 Lantai Kayu Panil Gracewood m2 484,687.50
257 Las dop listrik Buah 687.50
HRG SATUAN
NO URAIAN SATUAN
(RUPIAH)
258 Lem Kayu ltr 27,500.00
259 Lem Vinyl Kg 11,687.50
260 List Gypsum Besar m' 30,250.00
261 List Gypsum Kecil m' 16,500.00
262 Mangkok Saklar listrik Buah 2,475.00
263 MCB Buah 60,500.00
264 MCB Box isi 4 grup Buah 34,375.00
265 MCB Box isi 8 grup Buah 75,625.00
266 Melamic Clear kg 82,500.00
267 Melamic Gloss/dop (Finishing) kg 82,500.00
268 Mill kg 45,375.00
269 Minyak Bekisting liter 16,500.00
270 Minyak Cat liter 8,250.00
271 Minyak solar untuk industri / Minyak aspal liter 7,562.50
272 Minyak Gardan liter 10,312.50
273 Minyak Hidrolik liter 32,312.50
274 Minyak Selinder liter 21,312.50
275 Mozaik kayu lantai Uk. 30 x 30 cm buah 10,312.50
276 Pagar BRC, uk. 240 cm X 120 cm, dia. 5,5 mm Unit 474,375.00
277 Pagar BRC, uk. 240 cm X 90 cm, dia. 6 mm Unit 515,625.00
278 Paku Biasa bermacam ukuran 2" - 5" kg 20,625.00
279 Paku Biasa 1/2" - 1" kg 24,750.00
280 Paku Sumbat buah 825.00
281 Paku Beton buah 962.50
282 Paku Gypsum kg 34,375.00
283 Paku Seng,Asbes kg 30,250.00
284 Paku Asbes buah 825.00
285 Paku Sekrup 3,5" Kg 61,875.00
286 Paku Sekrup 3,5" buah 618.75
287 Parquet Jati m2 529,375.00
288 Pasir Beton / Pasang m3 127,187.50
HRG SATUAN
NO URAIAN SATUAN
(RUPIAH)
289 Pasir Urug m3 89,375.00
290 Pewarna nat Bks 13,750.00
291 Pintu Alluminium m2 880,000.00
292 Pintu Besi Baja m2 2,681,250.00
293 Pintu Lipat m2 522,500.00
294 Pintu PVC lengkap + pemasangan Unit 288,750.00
295 Pipa besi medium 2 mm & 1/2", pjg 6 m M' 25,437.50
296 Pipa besi medium 2 mm & 3/4", pjg 6 m M' 32,175.00
297 Pipa besi medium 2 mm & 1", pjg 6 m M' 40,115.63
298 Pipa besi medium 2 mm & 1,5", pjg 6 m M' 57,337.50
299 Pipa besi medium 2 mm & 2", pjg 6 m M' 72,187.50
300 Pipa besi medium 2 mm & 2,5", pjg 6 m M' 94,187.50
301 Pipa besi medium 2 mm & 3", pjg 6 m M' 149,187.50
302 Pipa besi medium 2 mm & 4", pjg 6 m M' 194,425.00
303 Pipa paralon listrik 5/8" Btg 8,250.00
304 Pipa PVC & 1/2" mutu A (Wavin dan sejenis) M' 5,500.00
305 Pipa PVC biasa & 1/2" mutu B M' 5,156.25
306 Pipa PVC & 3/4" mutu A (Wavin dan sejenis) M' 7,562.50
307 Pipa PVC & 3/4" mutu B M' 6,325.00
308 Pipa PVC & 1" mutu A (Wavin dan sejenis) M' 10,312.50
309 Pipa PVC & 1" mutu B M' 6,531.25
310 Pipa PVC & 1.5" mutu A (Wavin dan sejenis) M' 17,875.00
311 Pipa PVC & 1.5" mutu B M' 11,000.00
312 Pipa PVC & 2" mutu A ( Wavin dan sejenis) M' 22,515.63
313 Pipa PVC & 2" mutu B M' 14,437.50
314 Pipa PVC & 3" mutu A (Wavin dan sejenis) M' 44,171.88
315 Pipa PVC & 3" mutu B M' 24,062.50
316 Pipa PVC & 4" mutu A ( Wavin dan sejenis) M' 71,500.00
317 Pipa PVC & 4" mutu B M' 41,250.00
318 Pipa PVC & 6" (15 cm) mutu A (Wavin dan sejenis) M' 170,156.25
319 Pipa Stainless 2", tebal 1 mm M' 103,125.00
320 Pipa Stainless 2", tebal 0.8 mm M' 92,400.00
321 Pipa Stainless 2,5", tebal 1 mm M' 130,900.00
322 Pipa Stainless 2,5", tebal 1.2 mm M' 115,500.00
323 Plamir Tembok kg 11,000.00
324 Plamir Kayu kg 23,375.00
325 Plat stainless, tebal 1 mm, uk. 244 cm X 122 cm Lbr 2,337,500.00
326 Plint keramik 10 x 30 cm warna buah 5,500.00
327 Plint keramik 10 x 40 cm warna buah 18,150.00
328 Plint Ubin PC Abu-abu 15 x 20 cm buah 1,100.00
329 Plint Ubin PC Abu-abu 10 x 30 cm buah 1,168.75
330 Plint Ubin PC Abu-abu 10 x 40 cm buah 1,203.13
331 Plywood warna/Jabarwood Lbr 151,250.00
332 Plywood Jati 3 mm Lbr 151,250.00
333 Plywood Sungkay 3 mm Lbr 151,250.00
334 Plywood 3 mm Lbr 57,750.00
335 Plywood 4 mm Lbr 93,500.00
336 Plywood 6 mm Lbr 121,000.00
HRG SATUAN
NO URAIAN SATUAN
(RUPIAH)
337 Plywood 9 mm Lbr 171,875.00
338 Plywood 12 mm Lbr 220,000.00
339 Plywood 20 mm Lbr 288,750.00
340 Politur dasar ltr 67,375.00
341 Politur Jadi ltr 72,875.00
342 Porselin Putih Uk. 10 x 10 cm buah 962.50
343 Porselin Warna Uk. 10 x 10 cm buah 1,375.00
344 Rangka Atap baja ringan untuk atap genteng, gent m2 391,875.00
keramik, beton, dll + pemasangan
345 Rangka Atap baja ringan untuk atap seng metal, at m2 297,275.00
asbes, aluminium, sirap, dll + pemasangan
346 Rangka Atap baja ringan bentuk joglo/bertumpuk/ m2 387,337.50
khusus + pemasangan
347 Rangka Atap baja ringan "Pryda" untuk atap Pelana, m2 351,312.50
Metal dan keramik + pemasangan
348 Rangka Atap baja ringan "Pryda" untuk atap Perisai, m2 387,337.50
Metal dan keramik + pemasangan
349 Rangka Atap baja ringan "Pryda" untuk atap Joglo, m2 450,450.00
Metal dan keramik + pemasangan
350 Rel Pintu Dorong Unit 330,000.00
351 Rolling Door Standar, t=4 mm, (minimal pas. 7 M2) m2 804,375.00
352 Rolling Door Standar, t=5 mm, (minimal pas. 7 M2) m2 866,250.00
353 Sanding Sealer Impra (Cat dasar) Kg 52,250.00
354 Seal Tape buah 4,812.50
355 Semen ( 50 kg ) Zak 85,937.50
356 Semen Portland ( PC ) kg 1,718.75
357 Semen Putih (40 kg) Zak 116,875.00
358 Semen Putih Kg 2,750.00
359 Semen Merah m3 52,250.00
360 Semen Nat kg 16,500.00
361 Seng Gelombang , lebar 70 cm m2 10,209.38
362 Seng Plat 120 cm X 240 cm lbr 145,750.00
HRG SATUAN
NO URAIAN SATUAN
(RUPIAH)
363 Seng Plat 33 cm M' 18,150.00
364 Seng Plat 38 cm M' 25,437.50
365 Seng Plat 45 cm M' 27,500.00
366 Seng Plat 55 cm M' 35,750.00
367 Seng Plat 88 cm M' 45,375.00
368 Seng Plat 92 cm M' 48,125.00
369 Sabun Kg 15,400.00
370 Soda Api Kg 41,250.00
371 Soft Board ( 120 x 240 ) mm lbr 92,812.50
372 Saklar Tunggal biasa Buah 8,250.00
373 Saklar Ganda biasa Buah 18,562.50
374 Saklar Tunggal National Buah 23,925.00
375 Saklar Ganda National Buah 41,250.00
376 Scafolding tg 1,77 m X 1,77 m Unit 1,100,000.00
377 Roda Scafolding 4 buah Unit 481,250.00
378 Smartruss Aluminium Magnesium
- Lysaght Smartruss C 75.100 M' 30,937.50
- Lysaght Smartruss C 75.75 M' 25,850.00
- Reng U T S 40 M' 22,412.50
- Screw / Dynabolt Buah 2,612.50
- Valery Gutter Talang Jurai M' 172,425.00
- Strap Bracing M' 17,187.50
379 Stop Kontak biasa Buah 23,375.00
380 Stop kontak AC Buah 103,125.00
381 Sunscreen Aluminium M2 515,625.00
382 T.Duss listrik Buah 1,650.00
383 Talang Paralon, pjg 4 m btg 66,000.00
384 Tali Ijuk Kg 15,675.00
385 Ijuk m3 33,000.00
386 Tanah Liat/Urug m3 68,750.00
387 Tanah Puru m3 75,625.00
388 Tanah Sirtu m3 110,000.00
389 Taekwood 3 mm m2 49,500.00
390 Taekwood 4 mm biasa m2 55,000.00
391 Ter / Residu liter 61,875.00
392 Textil Tape roll 9,418.75
393 Thinner biasa Liter 16,500.00
394 Thinner Cat Glossy (Cobra dan sejenis) Liter 48,125.00
395 Urinoir buah 192,500.00
396 Urinoir Toto U57M unit 226,875.00
397 Vernis ltr 34,375.00
398 Vernis Batu Kg 89,375.00
399 Wallpaper m2 385,000.00
400 Wastafel biasa buah 364,375.00
401 Wastafel Halmar unit 385,000.00
402 Wastafel Ex Toto L 521 VI A unit 618,750.00
403 Wood Filler Impra (dempul) Klg 44,000.00
404 Wood Stain Impra (cat pewarna) Klg 82,500.00
HRG SATUAN
NO URAIAN SATUAN
(RUPIAH)
C PERALATAN
1 Asphalt Finisher jam 295,625.00
2 Asphalt Mixing Plan jam 2,200,000.00
3 Asphalt Sprayer jam 89,375.00
4 Compresor jam 178,750.00
5 Concrete Mixer jam 20,625.00
6 Concrete Pump jam 512,356.14
7 Concrete Vibrator jam 30,250.00
8 Dump Truck jam 429,000.00
9 Excavator jam 818,125.00
10 Filter jam 55,000.00
11 Genset jam 343,750.00
12 Grader jam 309,375.00
13 Loader jam 103,125.00
14 Pneumatic Tired Roller jam 501,875.00
15 Tandem Roller jam 330,000.00
16 Flatbed Truck 3,5 ton jam 309,375.00
17 Water Tank Truck jam 412,500.00
18 Generator jam 48,125.00
19 Alat Bantu jam 103,125.00
20 Roller 3 roda jam 226,875.00
21 Sprayer, Selfprof jam 192,500.00
22 Buldozer jam 886,875.00
23 Scaffolding 177cm X 177 cm, Tg. 177 cm Set/Bulan 65,312.50
24 Stone Crusher (Pemecah batu) jam 1,072,500.00
25 Pengaduk beton jam 137,500.00
26 Stemper jam 33,000.00
27 Roller, Vibrator Pneu jam 123,750.00
28 Water Pump jam 343,750.00
D SERVICE
1 AC Window/Split/Multi Ls 41,250.00
2 Dispenser Ls 34,375.00
3 Kulkas/Freezer Ls 34,375.00
4 Kompor Gas 2T Ls 34,375.00
5 Kompor Gas 4T Ls 61,875.00
6 Mesin Cuci Ls 41,250.00
7 Pompa Air Ls 41,250.00
8 Instalasi listrik Ls 116,875.00
AN UPAH, BAHAN DAN PERALATAN 2019

HRG SATUAN HARGA HARGA


(RUPIAH) Swakelola (Rp) DASAR (Rp)

181,500.00 137,500.00 137,500.00


148,500.00 112,500.00 112,500.00
181,500.00 137,500.00 137,500.00
107,250.00 81,250.00 81,250.00
123,750.00 93,750.00 93,750.00
123,750.00 93,750.00 93,750.00
247,500.00 187,500.00 187,500.00
165,000.00 125,000.00 125,000.00
123,750.00 93,750.00 93,750.00
123,750.00 93,750.00 93,750.00
74,250.00 56,250.00 56,250.00
66,000.00 50,000.00 50,000.00
123,750.00 93,750.00 93,750.00
222,750.00 168,750.00 168,750.00
123,750.00 93,750.00 93,750.00

6,500.00 660,355.33 589,602.98


6,501.25 660,355.33 589,602.98
6,502.50 357,000.00 318,750.00
6,503.75 315,000.00 281,250.00
6,505.00 301,000.00 268,750.00
6,506.25 25,900.00 23,125.00
6,507.50 4,900.00 4,375.00
6,508.75 9,100.00 8,125.00
6,510.00 60,200.00 53,750.00
6,511.25 84,000.00 75,000.00
6,512.50 116,200.00 103,750.00
6,513.75 86,800.00 77,500.00
6,515.00 87,500.00 78,125.00
6,516.25 106,400.00 95,000.00
6,517.50 140,000.00 125,000.00
6,518.75 112,000.00 100,000.00
6,520.00 5,880.00 5,250.00
6,521.25 7,980.00 7,125.00
6,522.50 10,500.00 9,375.00
6,523.75 3,220.00 2,875.00
6,525.00 11,200.00 10,000.00
6,526.25 16,800.00 15,000.00
6,527.50 23,800.00 21,250.00
6,528.75 51,800.00 46,250.00
6,530.00 56,000.00 50,000.00
6,531.25 224,000.00 200,000.00
6,532.50 119,000.00 106,250.00
HRG SATUAN HARGA HARGA
(RUPIAH) Swakelola (Rp) DASAR (Rp)
6,533.75 84,000.00 75,000.00
6,535.00 1,400.00 1,250.00
6,536.25 95,200.00 85,000.00
6,537.50 33,600.00 30,000.00
6,538.75 35,000.00 31,250.00
6,540.00 44,800.00 40,000.00
6,541.25 49,000.00 43,750.00
6,542.50 46,900.00 41,875.00
6,543.75 49,000.00 43,750.00
6,545.00 46,900.00 41,875.00
6,546.25 16,800.00 15,000.00
6,547.50 16,800.00 15,000.00
6,548.75 364,000.00 325,000.00
6,550.00 270,200.00 241,250.00
6,551.25 455,000.00 406,250.00
6,552.50 252,000.00 225,000.00
6,553.75 252,000.00 225,000.00
6,556.25 70,000.00 62,500.00
6,557.50 3,640.00 3,250.00
6,558.75 266,000.00 237,500.00
6,560.00 259,000.00 231,250.00
6,561.25 716,800.00 640,000.00
6,562.50 1,750.00 1,562.50
6,563.75 1,015.00 906.25
6,565.00 315,000.00 281,250.00
6,566.25 490,000.00 437,500.00
6,567.50 130,200.00 116,250.00
6,568.75 831,600.00 742,500.00
6,570.00 560,000.00 500,000.00
6,571.25 660,355.33 589,602.98
6,572.50 660,355.33 589,602.98
6,573.75 490,000.00 437,500.00
HRG SATUAN HARGA HARGA
(RUPIAH) Swakelola (Rp) DASAR (Rp)
6,575.00 235,200.00 210,000.00
6,576.25 235,200.00 210,000.00
6,577.50 357,000.00 318,750.00
6,578.75 343,000.00 306,250.00
6,580.00 339,500.00 303,125.00
6,581.25 329,000.00 293,750.00
6,582.50 315,000.00 281,250.00
6,583.75 301,000.00 268,750.00
6,585.00 385,000.00 343,750.00
6,586.25 5,950.00 5,312.50
6,587.50 30,800.00 27,500.00
6,588.75 35,000.00 31,250.00
6,590.00 71,400.00 63,750.00
6,591.25 112,000.00 100,000.00
6,592.50 154,000.00 137,500.00
6,593.75 259,000.00 231,250.00
6,595.00 273,000.00 243,750.00
6,596.25 385,000.00 343,750.00
6,597.50 26,600.00 23,750.00
6,598.75 23,800.00 21,250.00
6,600.00 21,000.00 18,750.00
6,601.25 31,500.00 28,125.00
6,602.50 196,000.00 175,000.00
6,603.75 224,000.00 200,000.00
6,605.00 266,000.00 237,500.00
6,606.25 35,000.00 31,250.00
6,607.50 14,000.00 12,500.00
6,608.75 7,000.00 6,250.00
6,610.00 1,120,000.00 ###
6,611.25 1,190,000.00 ###
6,612.50 1,260,000.00 ###
6,613.75 1,330,000.00 ###
6,615.00 1,400,000.00 ###
6,616.25 1,470,000.00 ###
6,617.50 1,400,000.00 ###
6,618.75 1,610,000.00 ###
6,620.00 33,600.00 30,000.00
6,621.25 32,900.00 29,375.00
6,622.50 8,400.00 7,500.00
6,623.75 7,280.00 6,500.00
6,625.00 14,000.00 12,500.00
6,626.25 28,000.00 25,000.00
6,627.50 35,000.00 31,250.00
6,628.75 42,000.00 37,500.00
6,630.00 5,600.00 5,000.00
6,631.25 44,800.00 40,000.00
6,632.50 35,000.00 31,250.00
6,633.75 44,800.00 40,000.00
6,635.00 35,000.00 31,250.00
HRG SATUAN HARGA HARGA
(RUPIAH) Swakelola (Rp) DASAR (Rp)
6,636.25 63,000.00 56,250.00
6,638.75 42,000.00 37,500.00
6,640.00 56,000.00 50,000.00
6,641.25 67,200.00 60,000.00
6,642.50 58,800.00 52,500.00
6,643.75 51,800.00 46,250.00
6,645.00 58,800.00 52,500.00
6,646.25 114,800.00 102,500.00
6,647.50 17,500.00 15,625.00
6,648.75 36,400.00 32,500.00
6,650.00 38,500.00 34,375.00
6,651.25 133,000.00 118,750.00
6,652.50 770,000.00 687,500.00
6,653.75 3,150,000.00 ###
6,655.00 4,480,000.00 ###
6,656.25 2,625,000.00 ###
6,657.50 6,160,000.00 ###
6,658.75 3,808,000.00 ###
6,660.00 3,220,000.00 ###
6,661.25 756,000.00 675,000.00
6,662.50 224,000.00 200,000.00
6,663.75 44,800.00 40,000.00
6,665.00 252,000.00 225,000.00
6,666.25 378,000.00 337,500.00
6,667.50 455,000.00 406,250.00
6,668.75 2,520.00 2,250.00
6,670.00 3,360.00 3,000.00
6,671.25 3,430.00 3,062.50
6,672.50 4,200.00 3,750.00
6,673.75 9,800.00 8,750.00
6,675.00 28,000.00 25,000.00
HRG SATUAN HARGA HARGA
(RUPIAH) Swakelola (Rp) DASAR (Rp)
6,676.25 39,200.00 35,000.00
6,677.50 67,200.00 60,000.00
6,678.75 406,000.00 362,500.00
6,680.00 336,000.00 300,000.00
6,681.25 42,000.00 37,500.00
6,682.50 42,000.00 37,500.00
6,683.75 30,800.00 27,500.00
6,685.00 9,100.00 8,125.00
6,686.25 25,200.00 22,500.00
6,687.50 42,000.00 37,500.00
6,688.75 25,200.00 22,500.00
6,690.00 70,000.00 62,500.00
6,691.25 32,200.00 28,750.00
6,692.50 37,800.00 33,750.00
6,693.75 1,750.00 1,562.50
6,695.00 12,600.00 11,250.00
6,696.25 33,600.00 30,000.00
6,697.50 105,000.00 93,750.00
6,698.75 22,400.00 20,000.00
6,700.00 95,200.00 85,000.00
6,701.25 128,800.00 115,000.00
6,702.50 133,000.00 118,750.00
6,703.75 12,600.00 11,250.00
6,705.00 1,148,000.00 ###
6,706.25 420,000.00 375,000.00
6,707.50 126,000.00 112,500.00
6,708.75 189,000.00 168,750.00
6,710.00 5,460.00 4,875.00
6,711.25 7,280.00 6,500.00
6,712.50 8,400.00 7,500.00
6,713.75 14,000.00 12,500.00
6,715.00 18,200.00 16,250.00
6,716.25 25,200.00 22,500.00
6,717.50 173,600.00 155,000.00
6,718.75 270,200.00 241,250.00
6,721.25 2,240,000.00 ###
6,722.50 91,000.00 81,250.00
6,723.75 105,000.00 93,750.00
6,725.00 154,000.00 137,500.00
6,726.25 280,000.00 250,000.00
6,727.50 546,000.00 487,500.00
6,728.75 140,000.00 125,000.00
6,730.00 151,200.00 135,000.00
6,731.25 19,600.00 17,500.00
6,732.50 75,600.00 67,500.00
6,733.75 86,800.00 77,500.00
6,735.00 75,600.00 67,500.00
6,736.25 85,400.00 76,250.00
6,737.50 21,000.00 18,750.00
HRG SATUAN HARGA HARGA
(RUPIAH) Swakelola (Rp) DASAR (Rp)
6,738.75 77,000.00 68,750.00
6,740.00 81,200.00 72,500.00
6,741.25 9,100.00 8,125.00
6,742.50 105,000.00 93,750.00
6,743.75 25,200.00 22,500.00
6,745.00 28,000.00 25,000.00
6,746.25 21,000.00 18,750.00
6,747.50 54,600.00 48,750.00
6,748.75 39,200.00 35,000.00
6,750.00 21,000.00 18,750.00
6,751.25 140,000.00 125,000.00
6,752.50 25,200.00 22,500.00
6,753.75 26,600.00 23,750.00
6,755.00 11,200.00 10,000.00
6,756.25 12,600.00 11,250.00
6,757.50 12,600.00 11,250.00
6,758.75 14,700.00 13,125.00
6,760.00 16,100.00 14,375.00
6,761.25 3,500.00 3,125.00
6,762.50 4,900.00 4,375.00
6,763.75 10,500.00 9,375.00
6,765.00 8,750.00 7,812.50
6,766.25 77,000.00 68,750.00
6,767.50 11,550,000.00 ###
6,768.75 8,400,000.00 ###
6,770.00 4,620,000.00 ###
6,771.25 4,620,000.00 ###
6,772.50 2,100,000.00 ###
6,773.75 23,100.00 20,625.00
6,775.00 2,310,000.00 ###
6,776.25 42,000.00 37,500.00
HRG SATUAN HARGA HARGA
(RUPIAH) Swakelola (Rp) DASAR (Rp)
6,777.50 81,200.00 72,500.00
6,778.75 3,248.00 2,900.00
6,780.00 72,800.00 65,000.00
6,781.25 2,912.00 2,600.00
6,782.50 86,800.00 77,500.00
6,783.75 3,472.00 3,100.00
6,785.00 95,200.00 85,000.00
6,786.25 4,760.00 4,250.00
6,787.50 65,240.00 58,250.00
6,788.75 3,262.00 2,912.50
6,790.00 67,200.00 60,000.00
6,791.25 6,048.60 5,400.54
6,792.50 67,200.00 60,000.00
6,793.75 6,048.60 5,400.54
6,795.00 72,800.00 65,000.00
6,796.25 11,648.00 10,400.00
6,797.50 91,000.00 81,250.00
6,798.75 14,560.00 13,000.00
6,800.00 70,000.00 62,500.00
6,801.25 3,850.00 3,437.50
6,803.75 196.00 175.00
6,805.00 4,200.00 3,750.00
6,806.25 2,800.00 2,500.00
6,807.50 14,000.00 12,500.00
6,808.75 17,500.00 15,625.00
6,810.00 11,900.00 10,625.00
6,811.25 11,200.00 10,000.00
6,812.50 560,000.00 500,000.00
6,813.75 490,000.00 437,500.00
6,815.00 18,200.00 16,250.00
6,816.25 35,000.00 31,250.00
6,817.50 91,000.00 81,250.00
6,818.75 126,000.00 112,500.00
6,820.00 37,800.00 33,750.00
6,821.25 3,500.00 3,125.00
6,822.50 59,500.00 53,125.00
6,823.75 17,500.00 15,625.00
6,825.00 35,000.00 31,250.00
6,826.25 140,000.00 125,000.00
6,827.50 9,800.00 8,750.00
6,828.75 14,000.00 12,500.00
6,830.00 147,000.00 131,250.00
6,831.25 7,000.00 6,250.00
6,832.50 7,700.00 6,875.00
6,833.75 28,700.00 25,625.00
6,835.00 61,600.00 55,000.00
6,836.25 163,800.00 146,250.00
6,837.50 493,500.00 440,625.00
6,838.75 700.00 625.00
HRG SATUAN HARGA HARGA
(RUPIAH) Swakelola (Rp) DASAR (Rp)
6,840.00 28,000.00 25,000.00
6,841.25 11,900.00 10,625.00
6,842.50 30,800.00 27,500.00
6,843.75 16,800.00 15,000.00
6,845.00 2,520.00 2,250.00
6,846.25 61,600.00 55,000.00
6,847.50 35,000.00 31,250.00
6,848.75 77,000.00 68,750.00
6,850.00 84,000.00 75,000.00
6,851.25 84,000.00 75,000.00
6,852.50 46,200.00 41,250.00
6,853.75 16,800.00 15,000.00
6,855.00 8,400.00 7,500.00
6,856.25 7,700.00 6,875.00
6,857.50 10,500.00 9,375.00
6,858.75 32,900.00 29,375.00
6,860.00 21,700.00 19,375.00
6,861.25 10,500.00 9,375.00
6,862.50 483,000.00 431,250.00
6,863.75 525,000.00 468,750.00
6,865.00 21,000.00 18,750.00
6,866.25 25,200.00 22,500.00
6,867.50 840.00 750.00
6,868.75 980.00 875.00
6,870.00 35,000.00 31,250.00
6,871.25 30,800.00 27,500.00
6,872.50 840.00 750.00
6,873.75 63,000.00 56,250.00
6,875.00 630.00 562.50
6,876.25 539,000.00 481,250.00
6,877.50 129,500.00 115,625.00
HRG SATUAN HARGA HARGA
(RUPIAH) Swakelola (Rp) DASAR (Rp)
6,878.75 91,000.00 81,250.00
6,880.00 14,000.00 12,500.00
6,881.25 896,000.00 800,000.00
6,882.50 2,730,000.00 ###
6,883.75 532,000.00 475,000.00
6,886.25 294,000.00 262,500.00
6,887.50 25,900.00 23,125.00
6,888.75 32,760.00 29,250.00
6,890.00 40,845.00 36,468.75
6,891.25 58,380.00 52,125.00
6,892.50 73,500.00 65,625.00
6,893.75 95,900.00 85,625.00
6,895.00 151,900.00 135,625.00
6,896.25 197,960.00 176,750.00
6,840.00 8,400.00 7,500.00
6,840.00 5,600.00 5,000.00
6,840.00 5,250.00 4,687.50
6,841.25 7,700.00 6,875.00
6,842.50 6,440.00 5,750.00
6,843.75 10,500.00 9,375.00
6,843.75 6,650.00 5,937.50
6,845.00 18,200.00 16,250.00
6,845.00 11,200.00 10,000.00
6,846.25 22,925.00 20,468.75
6,846.25 14,700.00 13,125.00
6,847.50 44,975.00 40,156.25
6,847.50 24,500.00 21,875.00
6,848.75 72,800.00 65,000.00
6,848.75 42,000.00 37,500.00
6,850.00 173,250.00 154,687.50
6,851.25 105,000.00 93,750.00
6,850.00 94,080.00 84,000.00
6,850.00 133,280.00 119,000.00
6,850.00 117,600.00 105,000.00
6,850.00 11,200.00 10,000.00
6,851.25 23,800.00 21,250.00
6,852.50 2,380,000.00 ###
6,852.50 5,600.00 5,000.00
6,853.75 18,480.00 16,500.00
6,855.00 1,120.00 1,000.00
6,856.25 1,190.00 1,062.50
6,857.50 1,225.00 1,093.75
6,858.75 154,000.00 137,500.00
6,860.00 154,000.00 137,500.00
6,861.25 154,000.00 137,500.00
6,862.50 58,800.00 52,500.00
6,863.75 95,200.00 85,000.00
6,865.00 123,200.00 110,000.00
HRG SATUAN HARGA HARGA
(RUPIAH) Swakelola (Rp) DASAR (Rp)
6,866.25 175,000.00 156,250.00
6,867.50 224,000.00 200,000.00
6,547.50 294,000.00 262,500.00
6,863.75 68,600.00 61,250.00
6,865.00 74,200.00 66,250.00
6,866.25 980.00 875.00
6,867.50 1,400.00 1,250.00
6,868.75 399,000.00 356,250.00
6,540.00
6,868.75 302,680.00 270,250.00

6,868.75 394,380.00 352,125.00

6,868.75 357,700.00 319,375.00


6,540.00
6,868.75 394,380.00 352,125.00
6,540.00
6,868.75 458,640.00 409,500.00
6,540.00
6,868.75 336,000.00 300,000.00
6,870.00 819,000.00 731,250.00
6,871.25 882,000.00 787,500.00
6,872.50 53,200.00 47,500.00
6,873.75 4,900.00 4,375.00
6,875.00 87,500.00 78,125.00
6,876.25 1,750.00 1,562.50
6,877.50 119,000.00 106,250.00
6,878.75 2,800.00 2,500.00
6,880.00 53,200.00 47,500.00
6,881.25 16,800.00 15,000.00
6,882.50 10,395.00 9,281.25
6,883.75 148,400.00 132,500.00
HRG SATUAN HARGA HARGA
(RUPIAH) Swakelola (Rp) DASAR (Rp)
6,885.00 18,480.00 16,500.00
6,886.25 25,900.00 23,125.00
6,887.50 28,000.00 25,000.00
6,888.75 36,400.00 32,500.00
6,890.00 46,200.00 41,250.00
6,891.25 49,000.00 43,750.00
6,892.50 15,680.00 14,000.00
6,893.75 42,000.00 37,500.00
6,895.00 94,500.00 84,375.00
6,896.25 8,400.00 7,500.00
6,897.50 18,900.00 16,875.00
6,898.75 24,360.00 21,750.00
6,900.00 42,000.00 37,500.00
6,901.25 1,120,000.00 ###
6,902.50 437,500.00

6,903.75 31,500.00 28,125.00


6,905.00 26,320.00 23,500.00
6,906.25 22,820.00 20,375.00
6,907.50 2,660.00 2,375.00
6,906.25 175,560.00 156,750.00
6,907.50 17,500.00 15,625.00
6,898.75 23,800.00 21,250.00
6,897.50 105,000.00 93,750.00
6,896.25 525,000.00 468,750.00
6,897.50 1,680.00 1,500.00
6,897.50 67,200.00 60,000.00
6,898.75 15,960.00 14,250.00
6,900.00 33,600.00 30,000.00
6,901.25 70,000.00 62,500.00
6,902.50 77,000.00 68,750.00
6,903.75 112,000.00 100,000.00
6,905.00 50,400.00 45,000.00
6,906.25 56,000.00 50,000.00
6,907.50 63,000.00 56,250.00
6,908.75 9,590.00 8,562.50
6,910.00 16,800.00 15,000.00
6,911.25 49,000.00 43,750.00
6,912.50 196,000.00 175,000.00
6,913.75 231,000.00 206,250.00
6,915.00 35,000.00 31,250.00
6,916.25 91,000.00 81,250.00
6,917.50 392,000.00 350,000.00
6,917.50 371,000.00 331,250.00
6,918.75 392,000.00 350,000.00
6,920.00 630,000.00 562,500.00
6,921.25 44,800.00 40,000.00
6,922.50 84,000.00 75,000.00
HRG SATUAN HARGA HARGA
(RUPIAH) Swakelola (Rp) DASAR (Rp)

6,536.25 301,000.00 268,750.00


6,537.50 2,240,000.00 2,000,000.00
6,538.75 91,000.00 81,250.00
6,540.00 182,000.00 162,500.00
6,541.25 21,000.00 18,750.00
6,542.50 521,671.71 465,778.31
6,543.75 30,800.00 27,500.00
6,545.00 436,800.00 390,000.00
6,546.25 833,000.00 743,750.00
6,547.50 56,000.00 50,000.00
6,548.75 350,000.00 312,500.00
6,550.00 315,000.00 281,250.00
6,551.25 105,000.00 93,750.00
6,552.50 511,000.00 456,250.00
6,553.75 336,000.00 300,000.00
6,555.00 315,000.00 281,250.00
6,556.25 420,000.00 375,000.00
6,557.50 49,000.00 43,750.00
6,558.75 105,000.00 93,750.00
6,560.00 231,000.00 206,250.00
6,561.25 196,000.00 175,000.00
6,562.50 903,000.00 806,250.00
6,563.75 66,500.00 59,375.00
6,566.25 1,092,000.00 975,000.00
6,567.50 140,000.00 125,000.00
6,568.75 33,600.00 30,000.00
6,570.00 126,000.00 112,500.00
6,571.25 350,000.00 312,500.00

6,536.25 42,000.00 37,500.00


6,537.50 35,000.00 31,250.00
6,538.75 35,000.00 31,250.00
6,540.00 35,000.00 31,250.00
6,541.25 63,000.00 56,250.00
6,542.50 42,000.00 37,500.00
6,543.75 42,000.00 37,500.00
6,545.00 119,000.00 106,250.00