Jatisela, Agustus 2015
Diajukan Oleh :
Penerima Bantuan
Anyar
Disanggupi Oleh :
UD. Sumber Ekonomi
ABDUL RAHMAN
TFL NO NO TANGGAL TAHUN SATKER PPK NO. BNBA
URUT
SUMBER D
I Pekerjaan Persiapan
1 Bongkaran Bangunan Lama ls 250,000 - -
2 Pasang Pondasi Batu m3 150,000 - -
II Pekerjaan Dinding
1 Beton Sloof
- Besi beton Ø 8 mm 7 btg 40,000 293,333 293,333.33
- Besi beton Ø 6 mm 4 btg 30,000 132,000 132,000.00
- kawat ikat 1 kg 20,000 22,000 22,000.00
- Semen @ 50 Kg 2 zak 60,000 145,200 145,200.00
- Pasir Pasang 2 m3 140,000 277,200 277,200.00
SUMBER D
IV Pekerjaan Lantai
Lantai Rabat ( Mutu Boton 1 : 5 ), t = 5 cm
- Semen @ 50 Kg 5 zak 60,000 270,000 270,000
- Pasir pasang 2 m3 140,000 252,000 252,000
V Upah Kerja
- Tukang 29 oh 75,000 2,175,000 2,175,000
- Pembantu tukang 29 oh 50,000 1,450,000 1,450,000
- Makan siang dan minum - kl 15,000 - -
VI Lain-lain
- Kunci Pintu Kelas Menengah 3 set 85,000 255,000 255,000
- Paku Biasa 5 kg 15,000 75,000 75,000
- Paku Seng 2 kg 24,000 48,000 48,000
- Engsel Pintu 3 ps 10,000 30,000 30,000
- Engsel Jendela 4 ps 8,000 32,000 32,000
- Grendel Pintu 3 set 7,000 21,000 21,000
- Grendel Jendela 4 set 8,000 32,000 32,000
- Rooster Ventilasi 14 bh 10,000 140,000 140,000
Anyar,
Diketahui Oleh :
Fasilitator Ketua KPB
FORMAT PT-06
SUMBER D
Disahkan oleh,
Tim Teknis
Kabupaten Lombok Utara
SWADAYA
- Gotong Royong
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
FORMAT PT-06
SWADAYA
-
-
-
-
-
-
-
-
-
-
- 28.513825
- 28.513825
- 0
-
-
-
-
-
-
-
-
Rp -
###
Diajukan Oleh :
Penerima Bantuan
FORMAT PT-06
SWADAYA
MULHADI
Diverifikasi oleh,
Koordinator Fasilitator
Kabupaten Lombok Utara
Akhmad Zainurain
UKURAN RUMAH :
PANJANG 6.00 m
LEBAR 5.00 m
TINGGI 3.25 m
LUAS BANGUNAN 30.00 m2
DIMENSI
No Uraian Pekerjaan Panjang Lebar Tinggi kerusakan Volume
(m) (m) (m) (%)
1 Sloof Beton (13/15) 22.00 0.13 0.15 0% -
- Besi 10 7.33
- Besi 6 4.40
- Kawat Ikat 1.10
- Semen 2.42
- Pasir Pasang 1.98
- Bekisting 5.50
13 Upah Kerja
- Pembantu tukang 28.51
- Tukang 28.51
- Makan and Minum 28.51
14 Lain - Lain
- Kunci Pintu 3.00
- Paku Biasa 5.00
- paku Seng 2.00
- Engsel Pintu 3.00
- Engsel Jendela 4.00
- Grendel Pintu 3.00
- Grendel Jendela 4.00
- Rooster Ventilasi 14.00
- Pintu WC PVC
Satuan HOK
m3 -
lonjor
lonjor
kg
zak
m3
lembar
m3 0.83
lonjor
lonjor
kg
zak
m3
m2 4.91
bh
m3
zak
m2 -
bh
m3
zak
m3 1.50
lonjor
lonjor
kg
zak
m3
m2 6.55
7.00
bh
bh
bh
bh
bh
bh 1.00
batang
batang
batang 1.00
m' 2.69
m 1.00
m 1.14
m3 0.90
zak
m3
28.51
hok
hok
KL
set
kg
kg
ps
ps
bh
bh
bh
ANALISA BIAYA KONSTRUKSI RUMAH MBR BSPS 2017
B.6.1 Menggali 1 m³ tanah biasa sedalam 1 meter
Bahan
Pekerja OH 0.750
Tenaga kerja
D.6.4 Memasang 1 m² dinding bata merah uk.(5 x 11 x 22) cm tebal 1 bata, camp. spesi 1 PC : 5 PP
D.6.10 Memasang 1 m² dinding bata merah uk. (5 x 11 x 22) cm tebal 1/2 bata, camp. spesi 1 PC : 5 PP
F.6.2 Membuat dan memasang 1 m³ kusen pintu dan kusen jendela, kayu kelas II atau III
F.6.8 Membuat 1 m² daun pintu kayu lapis (plywood) rangkap, rangka tertutup kayu kls II (lbr sampai 90 cm)
F.6.13 Memasang 1 m³ konstruksi kuda-kuda konvensional, kayu kls I, II dan III bentang 6 m
Mandor OH 0.005
Jumlah harga per satuan pekerjaan
Pekerja OH 0.2500
Tukang kayu OH 0.1500
Tenaga kerja
Kepala tukang kayu OH 0.0150
Mandor OH 0.0130
Jumlah harga per satuan pekerjaan
Portland Cement kg
Bahan
Pasir pasang (m³) m³
Pekerja OH
Tukang batu OH
Tenaga kerja
Kepala tukang batu OH
Mandor OH
Jumlah harga per satuan pekerjaan
AH MBR BSPS 2017
B.6.1 37,500.00
Harga Satuan
Jumlah
Bahan/Upah
(Rp.) (Rp.)
50,000.00 37,500.00
C.6.3 539,360.00
Harga Satuan
Jumlah
Bahan/Upah
(Rp.) (Rp.)
150,000.00 180,000.00
1,200.00 163,200.00
140,000.00 76,160.00
50,000.00 75,000.00
75,000.00 45,000.00
C.6.9 308,730.00
Harga Satuan
Jumlah
Bahan/Upah
(Rp.) (Rp.)
150,000.00 180,000.00
140,000.00 60,480.00
50,000.00 39,000.00
75,000.00 29,250.00
G.6.35 30,000.00
Harga Satuan
Jumlah
Jumlah
Bahan/Upah
(Rp.) (Rp.)
0.00 -
15,000.00 150.00
0.00 -
0.00 -
20,000.00 9,000.00
1,200.00 4,800.00
140,000.00 840.00
190,000.00 1,710.00
50,000.00 9,000.00
75,000.00 1,500.00
75,000.00 1,500.00
75,000.00 1,500.00
G.6.36 31,810.00
Harga Satuan
Jumlah
Bahan/Upah
(Rp.) (Rp.)
0.00 -
15,000.00 300.00
0.00 -
0.00 -
20,000.00 1,000.00
1,200.00 6,600.00
140,000.00 1,260.00
190,000.00 2,850.00
50,000.00 14,850.00
75,000.00 2,475.00
75,000.00 2,475.00
0.00 -
Harga Satuan
Jumlah
Bahan/Upah
(Rp.) (Rp.)
650.00 91,000.00
1,200.00 26,640.00
140,000.00 14,280.00
50,000.00 30,000.00
75,000.00 15,000.00
Harga Satuan
Jumlah
Bahan/Upah
(Rp.) (Rp.)
650.00 45,500.00
1,200.00 11,616.00
140,000.00 6,300.00
50,000.00 15,000.00
75,000.00 7,500.00
0.00 -
0.00 -
ga per satuan pekerjaan 85,916.00
Harga Satuan
Jumlah
Bahan/Upah
(Rp.) (Rp.) 67,687 kusen pintu tunggal 80x190
0.00 - 230,000
15,000.00 18,750.00
10,000.00 10,000.00 53,586 kusen jendela tunggal 60x130
50,000.00 300,000.00 190,000
75,000.00 1,350,000.00
0.00 -
0.00 -
ga per satuan pekerjaan 1,678,750.00
Harga Satuan
Jumlah
Bahan/Upah 300,000
(Rp.) (Rp.)
0.00 -
15,000.00 450.00
10,000.00 5,000.00
50,000.00 50,000.00
50,000.00 30,000.00
75,000.00 150,000.00
0.00 -
0.00 -
ga per satuan pekerjaan 235,450.00
Harga Satuan
Jumlah
Bahan/Upah
(Rp.) (Rp.)
0.00 -
Err:509 Err:509
15,000.00 84,000.00
50,000.00 200,000.00
75,000.00 900,000.00
0.00 -
0.00 -
ga per satuan pekerjaan Err:509
F.6.15 Err:509
Harga Satuan
Jumlah
Bahan/Upah
(Rp.) (Rp.)
0.00 -
Err:509 Err:509
15,000.00 45,000.00
50,000.00 120,000.00
75,000.00 540,000.00
0.00 -
0.00 -
ga per satuan pekerjaan Err:509
F.6.17 16,250.00
Harga Satuan
Jumlah
Bahan/Upah
(Rp.) (Rp.)
0.00 -
0.00 -
15,000.00 3,750.00
50,000.00 5,000.00
75,000.00 7,500.00
0.00 -
0.00 -
ga per satuan pekerjaan 16,250.00
F.6.21 21,500.00
Harga Satuan
Jumlah
Bahan/Upah
(Rp.) (Rp.)
0.00 -
15,000.00 1,500.00
50,000.00 5,000.00
75,000.00 15,000.00
0.00 -
0.00 -
ga per satuan pekerjaan 21,500.00
F.6.21.a 21,680.00
Harga Satuan
Jumlah
Bahan/Upah 34,000.00
(Rp.) (Rp.)
45,000.00 180.00
15,000.00 1,500.00
50,000.00 5,000.00
75,000.00 15,000.00
0.00 -
0.00 -
ga per satuan pekerjaan 21,680.00
H.6.3 61,250.00
Harga Satuan
Jumlah
Bahan/Upah
(Rp.) (Rp.)
1,500.00 37,500.00
50,000.00 12,500.00
75,000.00 11,250.00
0.00 -
0.00 -
ga per satuan pekerjaan 61,250.00
E.6.5
Harga Satuan
Jumlah
Indeks Bahan/Upah
(Rp.) (Rp.)
5.184 1,200.00 6,220.80
0.026 140,000.00 3,640.00
0.200 50,000.00 10,000.00
0.150 75,000.00 11,250.00
0.015 80,000.00 1,200.00
0.010 80,000.00 800.00
mlah harga per satuan pekerjaan 33,110.80
tu tunggal 80x190
JUMLAH
NO. URAIAN SATUAN KETERANGAN
HARGA
1 2 3 4 5
1 Pekerja HOK 50,000.00
2 Tukang batu HOK 75,000.00
3 Tukang kayu HOK 75,000.00
4 Kepala Tukang HOK 80,000.00
5 Mandor HOK 80,000.00
6 Tukang besi HOK 75,000.00
7 Batu belah 15 cm/20 cm m3 150,000.00
8 Batako 10 x 20 x 40 cm bh 2,200.00
9 Bata merah 5 x 11 x 22 cm bh 650.00
10 Kerikil m3 190,000.00
11 Pasir pasang m3 140,000.00
12 Portland Cement kg 1,200.00 60,000
13 Kayu Klas II m3
14 6 cm x 12 cm x 400 cm btg 110,000.00
15 4 cm x 10 cm x 300 cm btg 75,000.00
16 5 cm x 7 cm x 400 cm btg 56,000.00
17 2 cm x 15 cm x 400 cm m 12,500.00 50,000
18 Kayu Bekisting m3
19 Papan Bekisting lbr
20 Kusen Pintu bh 275,000.00
21 Kusen Jendela bh 275,000.00
22 Daun Pintu Panil bh 640,000.00
23 Daun Pintu Tripleks bh 300,000.00
24 Daun Jendela Kaca bh 275,000.00
25 Pintu KM PVC (Palastik)
26 Tripleks lbr 50,000.00
27 Kalsiplank Lbr 45,000.00
28 Besi beton polos kg
29 Besi Beton polos Ø 8 lonjor 40,000.00
30 Besi Beton polos Ø 6 lonjor 30,000.00
31 Kawat beton kg 20,000.00
32 Genteng Pres Lokal bh 1,500.00
33 Bubungan genteng pres Lokal bh 2,500.00
34 Seng gelombang lbr 40,000.00
35 Atap Spandek m' 40,000.00
36 Bubungan Seng Plat m' 20,000.00
37 Kunci pintu Biasa set 85,000.00
38 Paku Biasa kg 15,000.00
39 Paku Seng kg 24,000.00
40 Engsel Pintu ps 10,000.00
41 Engsel Jendela ps 8,000.00
42 Grendel Pintu bh 7,000.00
43 Grendel Jendela bh 8,000.00
44 Rooster Ventilasi bh 10,000.00
45 Lem Kayu 10,000.00
PENILAIAN KONDISI RUMAH TIDAK LAYAK HUNI (RTLH)/KEBUTUHAN RUMAH
RUMAH TEMBOK DENGAN SANITASI
Nomor BNBA :
Nama Penerima Bantuan :
Desa/Kelurahan :
Kecamatan :
Kabupaten/Kota : Foto Kondisi Rumah
Bobot (%)
( ……………………………………… ) ( ……………………………………… )
Mengetahui dan menyetujui,
Kepala Desa/Lurah …………………….
( ……………………………………… )
/KEBUTUHAN RUMAH
I
Tingkat Kerusakan
Nilai (%)
Bobot (%) (4 x 6)
(6) (7)
100% 12.40%
100% 13.65%
26.05%
50% 5.68%
50% 8.05%
13.73%
1% 0.03%
1% 0.03%
1% 0.06%
0.12%
0% 0.00%
50% 5.26%
5.26%
0% 0.00%
0% 0.00%
0.00%
50% 1.01%
0% 0.00%
1.01%
46.16%
SEDANG
……………., ……………………… 2017
Calon Penerima Bantuan
( ……………………………………… )