1 Jumlah = 1 buah
1 jumlah GC = 2 bak
2 debit rencana = Q peak = 0.8 m3/detik = 800 l/detik
3 debit masing - masing rencana = Q peak/ jumlah GC = 0.4 m3/det = 24 m3/menit
4 partikel terkecil yang diendapkan = 65 mesh = 0.2 mm
5 waktu detensi = 45 detik (45 - 90) detik = 0.75 menit
6 kecepatan pengendapan Vs = 1 m/menit (1.0 - 1.3) m/menit
7 kedalaman pengendapan,h = Vs*td = 0.75 m
8 kecepatan horisontal, Vh = 0.25 m/detik (0.25 - 0.4) m/det
9 A- cross bak = Q tiap bak/Vh = 1.6 m2
10 lebar bak = A-cross/h = 2.133 m
11 check Vh = Q tiap bak/(h*lebar) = 0.25 m/detik
12 A- surface = Q tiap bak/ Vs = 24 m2
13 panjang bak = A-surface/lebar = 11.25 m
14 Check Vs = Q tiap bak/ (panjang*lebar) = 1 m/menit
15 lahan yang diperlukan GC total = panjang*lebar*jumlah bak = 48 m2
1 jumlah BP = 3 bak
2 debit rencana = Q peak = 800 l/detik = 0.8 m3/detik = 6912 m3/hari
3 debit masing masing rencana = Q peak/ jml bak = 0.267 m3/detik = 23040 m3/hari = 960 m3/jam
4 waktu detensi = 2 jam (1.5 - 2.5) = 7200 detik
= 2500 gal/sq ft.d (2000 - 3000)
5 overflow rates (OFR)
= 80 m3/m2.hari (80 - 120)
6 volume tiap bak = Q tiap bak*td = 1920 m3
7 A surface = Q tiap bak/OFR = 288 m2
dimensi bak
bila BP1 persegi panjang
a. tinggi BP1 = Volume/Asurface = 6.67 m
b. panjang : lebar = 4
8 c. lebar BP1 = SQRT/A surface = 12 m
d. panjang BP1 = 4*lebar BP1 = 48 m
V2 =
3. organic volumetric = = 6400 m3 o = 1350 o = (300 - 1500)
V3 =
V = 14233.3632 maksimum
12 Jumlah trickling filter = 2 unit parallel
13 Dimensi per unit
Media volume = v= V/n = 7116.6816 m3
Media depth = h=3m
(1.5 – 3) m
Surface area = As = v/h = 2371.1172 m2
Diameter = D = ( 4 AS / )0.5 = 54.9722246 m (6 – 60) m
Freeboard (jagaan) = 0.5 m
1 jumlah BP 2 = 2 bak
2 debit rencana = Qmaks = 800 l/detik = 0.8 m3/detik = 69120 m3/hari
3 debit masing masing bak = Q maks/jml bak = 0.4 m3/detik = 34560 m3/hari = 1440 m3/jam
4 waktu detensi = 1.5 jam (1.5 -2.5)
5 overflow rates (OFR) = 1100 gal/sqft.d (1000-2000)
= 44.77 m3/m2/hari
6 A surface = Q tiap bak/ OFR = 771.9455 m2
7 dimensi bak
7. Desinfeksi
9. Sludge Thickener
1 sumur pengumpul = 91 m2
2 bar screen = 3 m2
3 gris chamber = 48 m2
4 bak pengendap 1 = 864 m2
5 trickling filter = 4744.454 m2
6 bak pengendap 2 = 1543.891 m2
7 desinfeksi = 360 m2
8 sludge thickener = 29.238 m2
9 aerobic sludge digester = 719.3436 m2
10 sludge drying bed = 1667.414 m2
Luas lahan total = 10070.34 m2