1 Screeding tebal 3 cm M2
semen 0.288 zak
pasir beton 0.039 m3
tukang batu 0.1 org/hr
kepala tukang batu 0.01 org/hr
pekerja 0.2 org/hr
mandor 0.01 org/hr
2 Screeding tebal 2 cm M2
semen 0.2 zak
pasir beton 0.026 m3
tukang batu 0.1 org/hr
kepala tukang batu 0.01 org/hr
pekerja 0.2 org/hr
mandor 0.01 org/hr