Anda di halaman 1dari 279

Nama : Dinul Amin

Nim : 1506010018

15.5
4.5 4.0 3.5 3.5

P Q R S
6.0 Halaman Halaman 6.0
Halaman Halaman

J
Selasar
O I G
3.5 Ruang Tidur Utama H Ruang Tidur 2 3.5
Halaman Ruang Makan

E D
N F Ruang Tengah WC 2.0
22.0 3.0 Dapur 22.0
Halaman
C
B
Ruang Tamu
Ruang Tidur 1 3.5

A
Teras
M
9.5
Halaman K
Carport 7.0
L
Halaman

8.5 3.5 3.5

15.5
1) Berdasarkan gambar bantu di atas, akan dihitung luasan tiap - tiap petak
untuk mendapatkan luasan keseluruhan bangunan.

A = 3.5 x 2.5 = 8.75 m2


B = 3.5 x 3.5 = 12.25 m2
C = 3.5 x 3 = 10.50 m2
D = 2 x 1.5 = 3.00 m2
E = 5.5 x 2 = 11.00 m2
F = 4 x 3 = 12.00 m2
G = 3.5 x 3.5 = 12.25 m2
H = 3.5 x 2.5 = 8.75 m2
I = 4 x 3.5 = 14.00 m2
J = 3.5 x 1.5 = 5.25 m2
K = 7 x 3.5 = 24.50 m2
L = 5 x 3.5 = 17.50 m2
M = 9.5 x 8.5 = 80.75 m2
N = 4.5 x 3 = 13.50 m2
O = 4.5 x 3.5 = 15.75 m2
P = 6 x 4.5 = 27.00 m2
Q = 6 x 4 = 24.00 m2
R = 5.5 x 3.5 = 19.25 m2
S = 6 x 3.5 = 21.00 m2

Luas Total Bangunan = 341.00 m2

Luas Bangunan :
a. Luas Bangunan Induk ( Tanpa Halaman )
= 97.75 m2
b. Luas Halaman
= 243.25
c. Luas Bangunan Teras dan Selasar
= 14.00 m2
d. Luas Bangunan Induk ( Tanpa Teras dan Selasar )
= 83.75 m2
e. Luas Bangunan WC/KM
= 3.00 m2

2) Berdasarkan gambar detail kusen pintu , jendela dan bouven pada gambar -
gambar terlampir, maka akan dihitung Luasan tiap kusen sebagai berikut :

a) Untuk Type PJ
Type Kusen Lebar ( m ) Tinggi ( m ) Rumus Luasan Satuan
P - 1' 1.02 2.1 LxT 2.14 m2
J - 1' 1.86 1.7 LxT 3.16 m2
P - 2' 0.92 2.1 LxT 1.93 m2
J - 2' 1.24 1.7 LxT 2.11 m2
P - 3' 0.92 2.1 LxT 1.93 m2
J - 3' 1.24 1.2 LxT 1.49 m2
Note : Untuk Type PJ Pintu dan
Jendela dipisah lalu di -
jumlahkan Luasannya.

Total :
»PJ - 1 = (L. P - 1) + (L. J - 1)
= 5.30 m2
»PJ - 2 = (L. P - 2) + (L. J - 2)
= 4.04 m2
»PJ - 3 = (L. P - 3) + (L. J - 3)
= 3.42 m2

b) Untuk Type P , J dan BV


Tipe Kusen Lebar ( m ) Tinggi ( m ) Rumus Luasan Satuan
P-1 0.92 2.1 LxT 1.93 m2
P-2 0.82 2.1 LxT 1.72 m2
J-1 1.92 1.7 LxT 3.26 m2
J-2 1.3 1.7 LxT 2.21 m2
BV 1.32 0.52 LxT 0.69 m2

Total Luasan Kusen = 22.58 m2

c) Jumlah Tipe Kusen

Tipe Kusen Unit


PJ - 1 1
PJ - 2 1
PJ - 3 1
P-1 4
P-2 1
J-1 1
J-2 2
BV 1

L1 PJ - 1 = 5.30 x 1 = 5.30 m2
L2 PJ - 2 = 4.04 x 1 = 4.04 m2
L3 PJ - 3 = 3.42 x 1 = 3.42 m2
L4 P-1 = 1.93 x 4 = 7.73 m2
L5 P-2 = 1.72 x 1 = 1.72 m2
L6 J-1 = 3.26 x 1 = 3.26 m2
L7 J-2 = 2.21 x 2 = 4.42 m2
L8 BV = 0.69 x 1 = 0.69 m2
= 30.58 m2

d) Panjang Kusen ( L )
Panjang
Type a(m) h(m)
Kusen(m')
P - 1' 1.02 2.1 5.22
J - 1' 1.86 1.7 8.82
P - 2' 0.92 2.1 5.12
J - 2' 1.24 1.7 5.88
P - 3' 0.92 2.1 5.12
J - 3' 1.24 1.2 4.88
P-1 0.92 2.1 5.12
P-2 0.82 2.1 5.02
J-1 1.92 1.7 10.64
J-2 1.3 1.7 7.7
BV 1.32 0.52 4.2

3) Panjang Dinding
a) Panjang Dinding Dalam
Panjang Dinding Bagian Dalam :
= 6.5+6.5+4+4+(4 x 2) + 7.5 + 3.5 + 3.5
+ 2.5 + 3 + 2 + 2 + ( 3.5 x 4 ) + ( 3.5 x 4 )
+2
= 83.00 m
b) Panjang Dinding Luar

Panjang Dinding Bagian Dalam :


= 1 + 1 + 3.5 + 3.5 + 0.5
= 9.5 m
`
bar -
t:

pe PJ Pintu dan
ipisah lalu di -
n Luasannya.
+
7.5 + 3.5 + 3.5
x 4 ) + ( 3.5 x 4 )
No Sketsa Gambar Uraian Pekerjaan dan Perhitun
I Pekerjaan Persiapan
1) Pembersihan Lahan
L : 10.5
b : 8

L
2) Pemasangan Bouwplank
L : 10.5
b : 8

B
3) Penyediaan Air Kerja
II Perkerjaan Galian dan Urugan
1) 1) Pekerjaan Galian
a) Panjang Pondasi

= 3.5+2.5+2.5+3.5+4.5+4.5
+1.5+3.5+3.5+3.5+2.5+3.
+6.5+4+4+4+3.5+2+3.

Jadi,panjang ponda
2) Volume Galian Tanah Pondasi

Tugas Besar Rencana Anggaran dan Biaya 9


No Sketsa Gambar Uraian Pekerjaan dan Perhitun

B ( m)
1
L=Pp
Untuk Pondasi(GP)
GP=b x h x L
=1.00 X 1.00 X 107.00
107
h
2)

b) Pondasi 2
a)
B ( m)
1

Tugas Besar Rencana Anggaran dan Biaya 10


No Sketsa Gambar Uraian Pekerjaan dan Perhitun

b) c) Pondasi 3

B ( m)
0.9

c)

Volume Total Galian Tanah Pon


3)
3) Urugan Tanah Kembali

VTotal Galian
= 86.67

Tugas Besar Rencana Anggaran dan Biaya 11


No Sketsa Gambar Uraian Pekerjaan dan Perhitun
= 86.67
Tanah Pondasi

4) Urugan Tanah Peninggi Lantai


A ( m2 )
97.75

4) Volume Total Urugan Tanah

Tugas Besar Rencana Anggaran dan Biaya 12


No Sketsa Gambar Uraian Pekerjaan dan Perhitun
5) 5) Urugan Pasir Bawah Pondasi
L1 = 107

AANSTAMPING L2
L3
=
=
0
107
URUGAN PASIR

Type Pondasi b(m)


1 1
2 1
3 0.9

6)

6) Urugan Pasir Bawah Lantai

Luasan B. Induk
( Tanpa Halaman = 80.75
dan Teras )
Luasan B. Teras
= 14
dan Selasar
Luasan B. KM/WC = 3

Tugas Besar Rencana Anggaran dan Biaya 13


No Sketsa Gambar Uraian Pekerjaan dan Perhitun
PP1 = 107
PP5 = 0
PP3 = 107

Bangunan A ( m2 )
(A) 81
(B) 14
(C) 3

Volume Total Urugan Pasir

III Pekerjaan Pasangan dan Plesteran

Tugas Besar Rencana Anggaran dan Biaya 14


No Sketsa Gambar Uraian Pekerjaan dan Perhitun
1) 1) Pasangan Aanstamping Batu Karang/Kali

L1 = 107
L2 = 0
L3 = 107

Type Pondasi b(m)


2) 1 1
a) 2 1
3 0.9

Volume Total Pasangan Aanstamping Ba

2) Pasangan Pondasi Batu Karang/Kali


a) Pondasi 1
b) a(m)
0.3

Tugas Besar Rencana Anggaran dan Biaya 15


No Sketsa Gambar Uraian Pekerjaan dan Perhitun
b) Pondasi 2
a(m)
0.3

c) Pondasi 3
a(m)
0.3

c)

Volume Total Pasangan Pondasi Batu

3) 3) Pasangan Tembok Trasram

Tugas Besar Rencana Anggaran dan Biaya 16


No Sketsa Gambar Uraian Pekerjaan dan Perhitun
a) a) Tembok Trasram untuk WC/KM ( 1 pc : 3 psr )

L= (2*2)+(1.5*2)
= 7
P= Lebar Pintu KM/WC ( P -
= 0.82
= 0.82

L(m)
7

b) Tembok Trasram untuk B. 4 m ( 1 pc : 3 psr )


L= 25.5
b) P= Lebar Kusen ( P-1' ; P-2' )
= ( (1.02 x 1 ) + ( 0.92 x 1 ) )
c) = 1.94

L(m)
25.5

c) Tembok Trasram untuk B. 3 m ( 1 pc : 3 psr )


L= 14.5
P= Lebar Kusen ( P-3') x Unit
= ( 0.92 x 1 )

Tugas Besar Rencana Anggaran dan Biaya 17


No Sketsa Gambar Uraian Pekerjaan dan Perhitun
= 0.92

L(m)
14.5

Luasan Total Pasangan Tembok T

4)
4) a) Tembok Bangunan 3 m
a) Kusen PJ - 3 : L3 =
Kusen J - 1 : L6 =
b) Total Luasan Kusen ( LTot ) =

Panjang Dinding B.3 m( L1 )=


=
c)
L1 ( m )
18.5

b) Tembok Bangunan 4 m

Tugas Besar Rencana Anggaran dan Biaya 18


No Sketsa Gambar Uraian Pekerjaan dan Perhitun
Kusen PJ - 1 : L1 =
Kusen PJ - 2 : L2 =
Kusen P - 1 : L4 =
d) Kusen P - 2 : L5 =
Kusen J - 2 : L7 =
Kusen BV : L8 =
Total Luasan Kusen ( LTot ) =

Panjang Dinding B.4 m( L1 )=


e)
=

L1 ( m ) h1 ( m )
47.5 3.7

c) Tembok Bangunan Halaman 2 m ( Pagar )


Luas Lubang : L1 =
=
Tinggi Pagar : h=
f) Panjang Pagar : b=

d) Tembok Bangunan Halaman 3 m ( Pagar )


Tinggi Pagar : h=

Tugas Besar Rencana Anggaran dan Biaya 19


No Sketsa Gambar Uraian Pekerjaan dan Perhitun
Panjang Pagar : b=

g) e) Tembok Gewel Tipe A


a(m)
6.65

f) Tembok Gewel Tipe B


a(m)
9.75

g) Tembok Gewel Tipe C


a(m)
9.15

Luasan Total Pasangan Tembok

5) Plesteran Tembok Trasram ( 1pc : 3 psr)


a) Tembok KM/WC ( 1.5 m )
Plesteran Luar dan Dalam

Tugas Besar Rencana Anggaran dan Biaya 20


No Sketsa Gambar Uraian Pekerjaan dan Perhitun
Luas. Pas. Trasram ( AT ) : 26.77

b) Tembok B. 4 m ( 0.5 m )
Plesteran Luar dan Dalam
Luas. Pas. Trasram ( AT ) : 101.42

b) Tembok B. 3 m ( 0.5 m )
Plesteran Luar dan Dalam
Luas. Pas. Trasram ( AT ) : 50.47

Luasan Total Plesteran Tembok T


6) Plesteran Tembok Biasa ( 1pc : 5 psr)
a) Tembok Bangunan 3 m
Plesteran Luar dan Dalam
Luas. Pas. Tembok ( A ) : 20.54

b) Tembok Bangunan 4 m
Plesteran Luar dan Dalam
Luas. Pas. Tembok ( A ) : 317.93

c) Tembok Bangunan Halaman ( Pagar ) 2 m dan 3 m


Plesteran Luar dan Dalam
Luas. Pas. Tembok ( A ) : 53.80

Tugas Besar Rencana Anggaran dan Biaya 21


No Sketsa Gambar Uraian Pekerjaan dan Perhitun

d) Tembok Gewel Tipe A , B , C


Plesteran Luar
Luas. Pas. Tembok ( A ) : 44.09
Luasan Total Plesteran Tembok

6) Plesteran Pondasi Tepi Luar ( 1 pc : 4 psr )


a) Pondasi Bangunan Induk
b: 0.08
h: 0.3
PPTot B. Induk(L) : 0

b) Pondasi Bangunan Pagar


b: 0.03
h: 0.3
PPTot B. Pagar(L) : 0

Luasan Total Plesteran Pondasi Te

Luasan Total Plesteran Tembok Biasa + Po

Tugas Besar Rencana Anggaran dan Biaya 22


No Sketsa Gambar Uraian Pekerjaan dan Perhitun
7) Acian Tembok
L. Total Plesteran Tembok Trasram + L.Total Plesteram Tem

IV Pekerjaan Beton

1) 1) Cor Beton Slof ( 1 pc : 3 psr : 5 kr )


b: 0.15
h: 0.2
∑ P. Pondasi ( L ) : 0

2) Cor Beton Kolom ( 1 pc : 3 psr : 5 kr )


a) Kolom Bangunan 4 m
b : 0.15
a : 0.15
h : 4
2) Unit ( n ) : 17

3) b) Kolom Bangunan 3 m
a) b : 0.15
b) a : 0.15
c) h : 3.5
Unit ( n ) : 3

c) Kolom Teras

Tugas Besar Rencana Anggaran dan Biaya 23


No Sketsa Gambar Uraian Pekerjaan dan Perhitun
b : 0.3
4) a : 0.3
h : 3
Unit ( n ) : 2

d) Kolom Pagar 2 m
b : 0.25
a : 0.25
h : 2
Unit ( n ) : 10

e) Kolom Pagar 3 m
b : 0.25
a : 0.25
h : 3
Unit ( n ) : 11

Volume Total Cor Beton Kolo

5) 3) Cor Beton Ringbalk ( 1 pc : 3 psr : 5 kr )


a) Bangunan Induk
b: 0.15

Tugas Besar Rencana Anggaran dan Biaya 24


No Sketsa Gambar Uraian Pekerjaan dan Perhitun
h: 0.2
L: 214

b) Gewel
Tipe b(m)
6) A 0.15
B 0.15
C 0.15

Volume Cor Beton Ringbalk

4) Cor Balok Latei


Total Lebar Kusen = 2.88 + 2.16 + 2.16 + 0.92
= 13.48
b= 0.15
h= 0.15
7)
5) Cor Plat Beton ( 1 pc : 3 psr : 5 kr )
a: 3.5
h: 3
t: 0.3

Tugas Besar Rencana Anggaran dan Biaya 25


No Sketsa Gambar Uraian Pekerjaan dan Perhitun

6) Cor Meja Beton ( 1 pc : 3 psr : 5 kr )


a) Plat Meja
a: 2.95
b: 1
t: 0.1

b) Kaki Meja
b: 1
h: 0.8
t: 0.1
n: 3

Volume Total Cor Meja Beto

7) Cor Bak Beton ( 1 pc : 3 psr : 5 kr )


a) Plat Dasar Bak
b: 1
a: 0.75

Tugas Besar Rencana Anggaran dan Biaya 26


No Sketsa Gambar Uraian Pekerjaan dan Perhitun
t: 0.1

b) Sisi Bak
a: 0.75
h: 1.2
t: 0.1
n: 4

Volume Total Cor Bak Beton

V Pekerjaan Kayu Dan Kaca

1) 1) Pasangan Kayu Kusen Kelas I ( 6/12 )


Tipe Kusen b(m)
PJ1 0.06
PJ2 0.06
P2 0.06
P3 0.06

Tugas Besar Rencana Anggaran dan Biaya 27


No Sketsa Gambar Uraian Pekerjaan dan Perhitun
J1 0.06

Volume Total Pasangan Kayu Kusen Ke

2) Pasangan Kusen Alumunium ( 6/12 )


Type Kusen b(m)
P-2 0.06

Volume Total Pasangan Kusen Alumun

3) Pasangan Daun Pintu dan Jendela


a) Type P - 1'
b: 0.9
h: 2.02
t Pintu : 0.04
n: 1

Tugas Besar Rencana Anggaran dan Biaya 28


No Sketsa Gambar Uraian Pekerjaan dan Perhitun
t Kaca : 0.005
Luasan Kaca : 0.24 x 0.24
: 0.0576
n' : 3
V. Kaca : 0.00086

b) Type J-1'
b(m)
0.56

Total Volume Pasangan PJ -

c) Type P - 2'
b(m)
0.8

b) Type J-2'
b(m)
0.56

Total Volume Pasangan PJ -

Tugas Besar Rencana Anggaran dan Biaya 29


No Sketsa Gambar Uraian Pekerjaan dan Perhitun
c) Type P - 3'
b(m)
0.8

2)
3) d) Type J-3'
4) b(m)
0.56

Total Volume Pasangan PJ -

e) Type P - 1
b(m)
0.8

f) Type J - 1
b(m)
0.56

g) Type J - 2
b(m)
0.56

Tugas Besar Rencana Anggaran dan Biaya 30


No Sketsa Gambar Uraian Pekerjaan dan Perhitun

5)
a) h) Type BV
b(m)
0.6

Volume Total Pasangan Daun Pintu d

4) Pasangan Kaca 5 mm pada Pintu dan Jendela


a) Type P - 1'
b(m)
0.24

b) Type J - 1'
b(m)
0.46

c) Type J - 2'
b(m)
0.46

Tugas Besar Rencana Anggaran dan Biaya 31


No Sketsa Gambar Uraian Pekerjaan dan Perhitun

d) Type J - 3'
b(m)
0.46

e) Type J - 1
b(m)
0.46

f) Type J - 2
b(m)
0.46

g) Type BV
b(m)
0.5

b) Luasan Total Pasangan Kaca 5 mm Pintu

5) Pasangan Kayu Kap

Tugas Besar Rencana Anggaran dan Biaya 32


No Sketsa Gambar Uraian Pekerjaan dan Perhitun
a) Pasangan Kuda - Kuda Tipe 1 ( 2 unit )

b(m)
Balok Bubungan 0.08
Tiang Nok 0.08
Kaki Kuda - Kuda 0.08
Balok Tarik 0.08
Skur 0.08
Papan Pengapit 0.04
Balok Gording 0.08
Balok Pengunci 0.08

Volume Total Pasangan Kuda - Kud

b) Pasangan Kuda - Kuda Tipe 2 ( 1 unit )

b(m)
Balok Bubungan 0.08
Tiang Nok 0.08
Kaki Kuda - Kuda 0.08
Balok Tarik 0.08
Skur 0.08
Papan Pengapit 0.04

Tugas Besar Rencana Anggaran dan Biaya 33


No Sketsa Gambar Uraian Pekerjaan dan Perhitun
Balok Gording 0.08
6) Balok Pengunci 0.08

Volume Total Pasangan Kuda - Kud


6) Pasangan Papan Listplank 3/20
a) Keliling Sisi Luar
L1 = Lxn
= 5x4
= 20.00
L2 = Lxn
= 8.15 x 4
= 32.60

b) Keliling Bagian Miring


L1 = (2xp)+(2xL)x2
= ( 2 x 4.99 ) + ( 2 x 5 ) x 2
= 39.96
L2 = (2xp)+(2xl)x2
= ( 2 x 6.44 ) + ( 2 x 8.15 ) x
= 58.36

Tugas Besar Rencana Anggaran dan Biaya 34


No Sketsa Gambar Uraian Pekerjaan dan Perhitun
Volume Total Pasangan Papan Lis

Tugas Besar Rencana Anggaran dan Biaya 35


No Sketsa Gambar Uraian Pekerjaan dan Perhitun

Pekerjaan Pasangan Atap dan Plafon

1) Pasangan Atap Seng Gelombang BJLS 0.3


1) a) Pada Bangunan 4 m
a) Bagian
1
b) 2

Pada Balok Bubungan ( Seng Licin )


L= 1.23

VI b) Pada Bangunan 3 m
Bagian
1
2

Pada Balok Bubungan ( Seng Licin )


L= 2.65
2)
2) Pasangan Plafond Fibercement 120 x60 cm, 4 mm

Tugas Besar Rencana Anggaran dan Biaya 36


No Sketsa Gambar Uraian Pekerjaan dan Perhitun
a) Luas Tirisan B. 3 m
L1 = bxh
= 1 x 8.65
= 8.65
L2 = bxhx2
= 1x4x2
= 8

b) Luas Tirisan B. 3 m
L1 = bxh
= 1 x 11.15
= 11.15
` L2 = bxh
= 3.5 x 2
= 7
L3 = bxh
= 3.5 x 1.5
= 5.25
L4 = bxh x2
= 3.65 x 1 x 2
= 7.3
Luas Total Plafon = Luas B. Induk Tanpa Selas
= 83.75

Tugas Besar Rencana Anggaran dan Biaya 37


No Sketsa Gambar Uraian Pekerjaan dan Perhitun

c) Kayu Penggantung = L. Total Plafon x Koefisien


= 131.10

d) List Plafon
P. Tembok Dalam(PD) = (6.5x2)+((4x2)x3)+
+0.5+3+2.5+((3.5x2)x4)+(
= 99
K. Rumah Luar = 3.5+0.5+3.5+8.5+1+1+3.5
= 39.50

Tugas Besar Rencana Anggaran dan Biaya 38


No Sketsa Gambar Uraian Pekerjaan dan Perhitun

Tugas Besar Rencana Anggaran dan Biaya 39


No Sketsa Gambar Uraian Pekerjaan dan Perhitun

Pekerjaan Lantai

1) 1) Pasangan Tegel Keramik


a) a) Tegel Keramik 60/60
b) Luas B. Induk Tanpa
: 89.0
Selasar dan KM

2) Luas Tegel Keramik Luas B. Induk Tanpa


=
60/60 Selasar dan KM

b) Tegel Keramik 30/30


VII Luasan Selasar : 5.25
L.Tegel K. 30/30 = Luasan Selasar

Total Luas Pasangan Tegel Kera

3) 2) Pasangan Tegel Mozaik 30/30 Pada KM/WC


Luasan KM/WC : 3
Luas Tegel = Luasan KM/WC

Tugas Besar Rencana Anggaran dan Biaya 40


No Sketsa Gambar Uraian Pekerjaan dan Perhitun

3) Pasangan Tegel Porselin 10/20


a) Plat Meja Beton
a(m)
2.95

b) Kaki Meja Beton


b(m)
1

c Plat Dasar Bak KM.WC


a(m)
0.75

d) Kaki Bak KM/WC


b(m)
0.75

e) Pada dinding KM/WC


Lw ( m )
7

Tugas Besar Rencana Anggaran dan Biaya 41


No Sketsa Gambar Uraian Pekerjaan dan Perhitun

Total Luas Pasangan Tegel Porselin


4) Pasangan Tegel Plint 10/20
P.Dinding Dalam(DD) : 83.00
P.Dinding Luar(DL) : 9.5
P. Kusen ( PD ) : 35.84

Tugas Besar Rencana Anggaran dan Biaya 42


No Sketsa Gambar Uraian Pekerjaan dan Perhitun

Tugas Besar Rencana Anggaran dan Biaya 43


No Sketsa Gambar Uraian Pekerjaan dan Perhitun

Pekerjaan Intalasi Listrik dan Air


1) Pasangan Saklar Tunggal
2) Pasangan Saklar Seri
3) Pasangan Stop Kontak
4) Pasangan Lampu Hias
5) Pasangan Lampu Ruangan
6) Pasangan Lampu KM/WC
7) Pasangan Lampu Pijar
8) Pasangan Lampu Tidur
9) Pasangan Panel Pembagi ( MCB )
10) Pasangan KWH Meter PLN
VIII 11) Pasangan Wastafel
12) Pasangan Closet Jongkok
13) Pasangan Keran Air
14) Pasangan Kitchen Sink
15) Pasangan Meteran Air
16) Pipa PVC, ∅4"
17) Pipa PVC, ∅3"
18) Pipa PVC, ∅1"
19) Pipa Hawa, ∅1"
20) Pasangan Floor Drain
21) Pasangan Kabel Listrik 2.5 mm

Tugas Besar Rencana Anggaran dan Biaya 44


No Sketsa Gambar Uraian Pekerjaan dan Perhitun

Pekerjaan Finishing
1) Cat Tembok
Luas Cat Tembok = Luas Acian Tembok

2) Cat Plafon
Luas Cat Plafon = Luas Plafon

3) Cat Kayu
a) Untuk Kusen
Type A ( m2 )
PJ1 2.14
IX PJ2 3.16
P2 1.93
P3 2.11
J1 1.93
0 1.49
0 7.73
P-2 1.72
0 3.26
0 4.42
0 0.69

Tugas Besar Rencana Anggaran dan Biaya 45


No Sketsa Gambar Uraian Pekerjaan dan Perhitun

b) Untuk Listplank
b(m)
0.03

c) List Plafon
b(m)
0.03

Total Cat Kayu

4) Teac Oil
Cat Teac Oil = Total Luas Pasangan Daun

5) Cat Seng
Cat Seng = Luas Total Pasangan Atap

Tugas Besar Rencana Anggaran dan Biaya 46


No Sketsa Gambar Uraian Pekerjaan dan Perhitun

Tugas Besar Rencana Anggaran dan Biaya 47


No Sketsa Gambar Uraian Pekerjaan dan Perhitun

Pekerjaan Penggantung dan Pengunci

1) Pasangan Kunci Double Slaag


2) Pasangan Kunci KM/WC
3) Pasangan Grendel Jendela dan BV
4) Pasangan Engsel Pintu Kayu 5"
5) Pasangan Engsel Pintu Almunium 4"
6) Pasangan Engsel Jendela 5"
7) Pasangan Kait Angin
8) Pasangan Door Stopper
9) Pasangan Mur , Baut dan Beugel
X
Pekerjaan Septicktank dan Resapan

1) Galian Tanah Septicktank dan Resapan


Type b(m)
Septictank 1
Resapan 1

Volume Total Galian Tanah

2) Urugan Tanah Kembali Septicktank dan Resapan

Tugas Besar Rencana Anggaran dan Biaya 48


No Sketsa Gambar Uraian Pekerjaan dan Perhitun

XI Volume Total Galian


Tanah Septicktank = 7
dan Resapan

3) Urugan Pasir Peresapan


b(m)
1.05

4) Pasangan Batu Kosong Resapan


b(m)
1.05

5) Pasangan Batu Pecah 3/5 Resapan


b(m)
1.05

6) Pasangan Kerikil Bidang Resapan


b(m)
1.05

7) Pasangan Batu Karang Bidang Resapan


b(m)

Tugas Besar Rencana Anggaran dan Biaya 49


No Sketsa Gambar Uraian Pekerjaan dan Perhitun
1.38

8) Cor Rabat Beton ( 1 pc : 2 psr : 3 kr )


a(m)
0.35

9) Cor Plat Beton Septicktank ( 1 pc : 3 psr : 5 kr )


b(m)
1

10 Cor Plat Beton Resapan ( 1 pc : 3 psr : 5 kr )


b(m)
1

11) Cor Kolom Praktis ( 1 pc : 3 psr : 5 kr )


Type b(m)
0.15
Septicktank
0.15
Resapan 0.15

12) Pasangan Tembok Biasa ( 1 pc : 5 psr ) Untuk Resapan


h(m)
Septicktank 1.6

Tugas Besar Rencana Anggaran dan Biaya 50


No Sketsa Gambar Uraian Pekerjaan dan Perhitun

13) Plesteran Tembok Biasa ( 1 pc : 5 psr ) Untuk Resapan


A ( m2 )
Septicktank 8

14) Pasangan Tembok Trasram ( 1 pc : 3 psr ) Untuk Septickta


h(m)
Septicktank 1.6

15) Plesteran Tembok Trasram ( 1 pc : 3 psr ) Untuk Septickta


A ( m2 )
Septicktank 9.6

Tugas Besar Rencana Anggaran dan Biaya 51


No Sketsa Gambar Uraian Pekerjaan dan Perhitun

Pekerjaan Besi

1) Gerbang Pagar
a) Luasan Gerbang ( Besi Hollow 40x40 mm )
a= 3.25
h= 2.27

XII
Pekerjaan Lain - Lain

1) Pembersihan Kembali

Tugas Besar Rencana Anggaran dan Biaya 52


No Sketsa Gambar Uraian Pekerjaan dan Perhitun

XIII

Tugas Besar Rencana Anggaran dan Biaya 53


an Pekerjaan dan Perhitungan Volume Pekerjaan Satuan
an Persiapan

m A =Lxb
m A = 84 m2

m K =(L+2)x2+(b+2)x2
m K = 45 m'

=1 LS
alian dan Urugan

Pp = 107 m

3.5+2.5+2.5+3.5+4.5+4.5+1+1.5+1.5+1.5+3.5+1.5
+1.5+3.5+3.5+3.5+2.5+3.5+4.5+2+3.5+2+1.5+2+4 m
+6.5+4+4+4+3.5+2+3.5+3.5+3.5+3.5+3.5+2 m

Jadi,panjang pondasi 107 m

Tugas Besar Rencana Anggaran dan Biaya 54


an Pekerjaan dan Perhitungan Volume Pekerjaan Satuan

h(m) L(m)
1 107
L=Pp

V =(bxh)xL
=0 m3

h(m) L(m) V =(bxh)xL


1 0 =0 m3
L = PP2

Tugas Besar Rencana Anggaran dan Biaya 55


an Pekerjaan dan Perhitungan Volume Pekerjaan Satuan

h(m) L(m) V =(bxh)xL


0.9 107 = 86.67 m3
L = PP3

me Total Galian Tanah Pondasi V = 86.67 m3

1 VTotal Galian
86.67 m3 V =

Tugas Besar Rencana Anggaran dan Biaya 56


an Pekerjaan dan Perhitungan Volume Pekerjaan Satuan
86.67 m3 V =
3 Tanah Pondasi

= 28.89 m3

LTot ( m ) b(m) h(m) V = [ A - (L x b x 1/2 )] x h


214 0.3 0.3 = 88.12 m3

olume Total Urugan Tanah V = ### m3

Tugas Besar Rencana Anggaran dan Biaya 57


an Pekerjaan dan Perhitungan Volume Pekerjaan Satuan

m
m
m

h(m) L(h) V =(bxh)xL


0.1 107 V1 = 10.70 m3
0.1 0 V2 = 0.00 m3
0.5 107 V3 = 48.15 m3

v = 58.85

m2 »(A)

A
m 2
»(B)

m2 »(C)

Tugas Besar Rencana Anggaran dan Biaya 58


an Pekerjaan dan Perhitungan Volume Pekerjaan Satuan
m »(A)
m »(B) L
m »(C)

L(m) b(m) h(m) V = [ A - (L x b x 1/2 )]


107 0.15 0.15 V(A) = 10.91 m3
0 0.15 0.1 V(B) = 1.40 m3
107 0.15 0.1 V(C) = -0.50 m3
VTot 11.81 m3

Volume Total Urugan Pasir V = 70.66 m3

ngan dan Plesteran

Tugas Besar Rencana Anggaran dan Biaya 59


an Pekerjaan dan Perhitungan Volume Pekerjaan Satuan
arang/Kali

m
m
m

h(m) L(h) V =(bxh)xL


0.2 107 V1 = 21.40 m3
0.2 0 V2 = 0.00 m3
0.15 107 V3 = 14.45 m3

VTot = 35.85

asangan Aanstamping Batu Karang/Kali V = 35.85 m3

/Kali
a+b
V = hxL
b(m) h(m) L(m) 2
0.75 0.7 107 L = PP1 = 39.32 m3

Tugas Besar Rencana Anggaran dan Biaya 60


an Pekerjaan dan Perhitungan Volume Pekerjaan Satuan
a+b
V = hxL
b(m) h(m) L(m) 2
0.75 0.7 0 L = PP2 = 0.00 m3

a+b
V = hxL
b(m) h(m) L(m) 2
0.75 0.7 107 L = PP3 = 0.00 m3

39.32
v.tot =

al Pasangan Pondasi Batu Karang/Kali V = 39.32 m3

Tugas Besar Rencana Anggaran dan Biaya 61


an Pekerjaan dan Perhitungan Volume Pekerjaan Satuan
( 1 pc : 3 psr )

(2*2)+(1.5*2)
m
Lebar Pintu KM/WC ( P - 2 ) x Unit
x 1

P(m) h1 ( m ) H(m) AT = [( L x H ) - ( P x h1 )]
0.82 1.5 4 = 26.77 m2

1 pc : 3 psr )
m
Lebar Kusen ( P-1' ; P-2' ) x Unit
( (1.02 x 1 ) + ( 0.92 x 1 ) )
m

P(m) h1 ( m ) H(m) AT = [( L x H ) - ( P x h1 )]
1.94 0.3 4 = ### m2

1 pc : 3 psr )
m
Lebar Kusen ( P-3') x Unit
( 0.92 x 1 )

Tugas Besar Rencana Anggaran dan Biaya 62


an Pekerjaan dan Perhitungan Volume Pekerjaan Satuan
m

P(m) h1 ( m ) H(m) AT = [( L x H ) - ( P x h1 )]
0.92 0.3 3.5 = 50.47 m2

Total Pasangan Tembok Trasram A = ### m2

3.42 m2
3.26 m2
6.68 m2

4 + 3.5 + 3 + 4 + 4
18.5 m

h1 ( m ) LTot ( m2 ) AT ( m 2 ) LT ( m ) A = ( L1 x h1 ) + LTW - LTot - Vm


T
2

3.2 6.68 50.47 18.5 = 20.54

Tugas Besar Rencana Anggaran dan Biaya 63


an Pekerjaan dan Perhitungan Volume Pekerjaan Satuan
5.30 m2
4.04 m2
7.73 m2
1.72 m2
4.42 m2
0.69 m2
23.90 m2

8.5+3.5+3.5+3.5+3.5+3.5+3.5+3.5+3.5
+2+3.5+2+3.5
47.5 m

LTot ( m2 ) AT ( m2 ) hTW ( m ) LTW ( m ) A = ( L1 x h1 ) + ( hTW x LTW )m- 2LTot - VT


23.90 101.42 2.5 107 = ###

m ( Pagar )
0.3 x 1 x 20
6 m2
2.3 m
7+7+12 = 26 m A = Luas Pagar - Luas Lubang
= 53.8 m2
m ( Pagar )
3 m

Tugas Besar Rencana Anggaran dan Biaya 64


an Pekerjaan dan Perhitungan Volume Pekerjaan Satuan
15+15.5+6 = 36.5 m A =bxh
= ### m2

h(m) Unit A = 1 x a x h x Unit


1.92 1 2
= 6.384 m2

h(m) Unit A = 1 x a x h x Unit


2.76 1 2
= 13.46 m2

h(m) Unit A = 1 x a x h x Unit


2.65 2 2
= ### m2

n Total Pasangan Tembok Biasa A = ### m2

c : 3 psr)

A = AT x 2

Tugas Besar Rencana Anggaran dan Biaya 65


an Pekerjaan dan Perhitungan Volume Pekerjaan Satuan
m2 = ### m2

A = AT x 2
m2 = ### m2

A = AT x 2
m2 = ### m2

Total Plesteran Tembok Trasram A = ### m2


5 psr)

A = Ax2
m2 = ### m2

A = Ax2
m2 = ### m2

agar ) 2 m dan 3 m
A = Ax2
m 2
= ### m2

Tugas Besar Rencana Anggaran dan Biaya 66


an Pekerjaan dan Perhitungan Volume Pekerjaan Satuan

A = A*1
m2 = ### m2
n Total Plesteran Tembok Biasa A = ### m2

pc : 4 psr )

m : Plesteran Luar
m
m
A = (b + h ) x L x 1
=0 m2

m : Plesteran Luar
m
m
A = (b + h ) x L x 1
=0 m2
Total Plesteran Pondasi Tepi Luar A = 0.000 m2

steran Tembok Biasa + Pondasi Tepi Luar A = ### m2

Tugas Besar Rencana Anggaran dan Biaya 67


an Pekerjaan dan Perhitungan Volume Pekerjaan Satuan
AAC = Apl
am + L.Total Plesteram Tembok Biasa = ### m2

jaan Beton

kr )
m
m
m V =(bxh)xL
=0 m3
5 kr )

m
m
m
Unit V =(bxa)xhxn
= 1.53 m3

m
m
m
Unit V =(bxa)xhxn
= 0.54

Tugas Besar Rencana Anggaran dan Biaya 68


an Pekerjaan dan Perhitungan Volume Pekerjaan Satuan
m
m
m
Unit V =(bxa)xhxn
= 0.540 m3

m
m
m
Unit V =(bxa)xhxn
= 1.250 m3

m
m
m
Unit V =(bxa)xhxn
= 2.063 m3

ume Total Cor Beton Kolom A = 5.923 m3

r : 5 kr )

Tugas Besar Rencana Anggaran dan Biaya 69


an Pekerjaan dan Perhitungan Volume Pekerjaan Satuan
m
m V =(bxh)xL
= 6.42 m3

h(m) L(m) V =(bxh)xL


0.2 6.5 VA = 0.195 m3
0.2 8.5 VB = 0.255 m3
0.2 9 VC = 0.27 m3
VTot = 0.72 m3

olume Cor Beton Ringbalk A = 2.790 m3

2.88 + 2.16 + 2.16 + 0.92 + 0.82 + 1.92 + 1.3 + 1.32


m
m V = (b x h ) x Total Lebar Kusen
m 0.303 m3

kr )
m
m
m V =Axt
=(axh)xt

Tugas Besar Rencana Anggaran dan Biaya 70


an Pekerjaan dan Perhitungan Volume Pekerjaan Satuan
= 3.15 m3
5 kr )

m
m
m V =(axb)xt
= 0.295 m3

m
m
m
Unit V =[(bxh)xt]xn
= 0.24 m3

olume Total Cor Meja Beton V = 0.535 m3

kr )

m
m

Tugas Besar Rencana Anggaran dan Biaya 71


an Pekerjaan dan Perhitungan Volume Pekerjaan Satuan
m V =(bxa)xt
= 0.075 m3

m
m
m V = [( a x h ) x t] x n
Unit = 0.36 m3

olume Total Cor Bak Beton V = 0.435 m3

Kayu Dan Kaca

6/12 )
h(m) L(m') n(unit) V = [(( b x h ) x L ) x n ]
0.12 5.22 1 VP-1' = 0.038 m2
0.12 8.82 1 VJ-1' = 0.064 m2
0.12 5.12 1 VP-2' = 0.037 m2
0.12 5.88 1 VJ-2' = 0.042 m2

Tugas Besar Rencana Anggaran dan Biaya 72


an Pekerjaan dan Perhitungan Volume Pekerjaan Satuan
0.12 5.12 1 VP-3' = 0.037 m2

VTot = 0.217 m2

l Pasangan Kayu Kusen Kelas I ( 6/12 ) V = 0.217 m2

h(m) L(m') n(unit) V = [(( b x h ) x L ) x n ]


0.12 5.02 1 = 0.036 m'

l Pasangan Kusen Alumunium ( 6/12 ) V = 0.036 m'

m
m
m
unit

Tugas Besar Rencana Anggaran dan Biaya 73


an Pekerjaan dan Perhitungan Volume Pekerjaan Satuan
m
0.24 x 0.24
m2
unit
m3 V = (( b x h x t ) x n ) - V. Kaca
= 0.072 m2

h(m) t(m) n ( unit )


1.58 0.05 3 V = ((b x h x t) x n )
= 0.133 m2
otal Volume Pasangan PJ - 1 V = 0.205 m2

h(m) t(m) n ( unit )


2.02 0.035 1 V = ((b x h x t) x n )
= 0.057 m2

h(m) t(m) n ( unit )


1.58 0.05 2 V = ((b x h x t) x n )
= 0.088 m2
otal Volume Pasangan PJ - 2 V = 0.145 m2

Tugas Besar Rencana Anggaran dan Biaya 74


an Pekerjaan dan Perhitungan Volume Pekerjaan Satuan

h(m) t(m) n ( unit )


2.02 0.05 1 V = ((b x h x t) x n )
= 0.081 m2

h(m) t(m) n ( unit )


1.08 0.05 2 V = ((b x h x t) x n )
= 0.06 m2
otal Volume Pasangan PJ - 3 V = 0.141 m2

h(m) t(m) n ( unit )


2.02 0.05 1 V = ((b x h x t) x n )
= 0.081 m2

h(m) t(m) n ( unit )


1.58 0.05 3 V = ((b x h x t) x n )
= 0.133 m2

h(m) t(m) n ( unit )


1.58 0.05 2 V = ((b x h x t) x n )

Tugas Besar Rencana Anggaran dan Biaya 75


an Pekerjaan dan Perhitungan Volume Pekerjaan Satuan
= 0.088 m2

h(m) t(m) n ( unit )


0.42 0.05 2 V = ((b x h x t) x n )
= 0.025 m2

al Pasangan Daun Pintu dan Jendela V = 24 m2

u dan Jendela

h(m) n ( unit )
0.24 3 A =((bxh)xn)
= 0.173 m2

h(m) n ( unit )
1.48 3 A =((bxh)xn)
= 2.042 m2

h(m) n ( unit )
1.48 2 A =((bxh)xn)

Tugas Besar Rencana Anggaran dan Biaya 76


an Pekerjaan dan Perhitungan Volume Pekerjaan Satuan
= 1.362 m2

h(m) n ( unit )
0.98 2 A =((bxh)xn)
= 0.902 m2

h(m) n ( unit )
1.48 3 A =((bxh)xn)
= 2.042 m2

h(m) n ( unit )
1.48 2 A =((bxh)xn)
= 1.362 m2

h(m) n ( unit )
0.32 2 A =((bxh)xn)
= 0.32 m2

Pasangan Kaca 5 mm Pintu dan Jendela A = 0.539 m2

Tugas Besar Rencana Anggaran dan Biaya 77


an Pekerjaan dan Perhitungan Volume Pekerjaan Satuan
( 2 unit )

h(m) L(m) n ( unit ) V = [(b x h ) x L] x n


0.12 1.23 1 V = 0.012 m3
0.12 3.24 2 V = 0.062 m3
0.12 6.45 2 V = 0.124 m3
0.12 10.73 2 V = 0.206 m3
0.12 2.19 4 V = 0.084 m3
0.12 1.84 4 V = 0.035 m3
0.1 8.15 18 V = 1.174 m3
0.12 0.9 4 V = 0.035 m3

Total Pasangan Kuda - Kuda Tipe 1 V = 0.539 m3

( 1 unit )

h(m) L(m) n ( unit ) V = [(b x h ) x L] x n


0.12 2.65 1 V = 0.025 m3
0.12 3.24 1 V = 0.031 m3
0.12 6.45 2 V = 0.124 m3
0.12 13,,41 1 V = ### m3
0.12 1.54 2 V = 0.03 m3
0.12 3.75 2 V = 0.036 m3

Tugas Besar Rencana Anggaran dan Biaya 78


an Pekerjaan dan Perhitungan Volume Pekerjaan Satuan
0.1 5.00 14 V = 0.56 m3
0.12 0.9 1 V = 0.009 m3

Total Pasangan Kuda - Kuda Tipe 2 V = 0.366 m3

m LTot = 52.60 m'

(2xp)+(2xL)x2
( 2 x 4.99 ) + ( 2 x 5 ) x 2
m
(2xp)+(2xl)x2
( 2 x 6.44 ) + ( 2 x 8.15 ) x 2
m LTot = 98.32 m'

Tugas Besar Rencana Anggaran dan Biaya 79


an Pekerjaan dan Perhitungan Volume Pekerjaan Satuan
e Total Pasangan Papan Listplank L = ### m'

Tugas Besar Rencana Anggaran dan Biaya 80


an Pekerjaan dan Perhitungan Volume Pekerjaan Satuan

ngan Atap dan Plafon

g BJLS 0.3

a(m) b(m) A =axb


1.23 5.36 A1 = 6.587 m2
1.23 5.36 A2 = 6.587 m2
ATot = 13.17 m2

m L = 1.23 m'

a(m) b(m) A =axb


2.65 4.29 A1 = 11.36 m2
2.65 4.29 A2 = 11.36 m2
ATot = 22.71 m2

m L = 2.65 m'

120 x60 cm, 4 mm

Tugas Besar Rencana Anggaran dan Biaya 81


an Pekerjaan dan Perhitungan Volume Pekerjaan Satuan

m2

LTot = L1 + L2
m2 = 16.65 m2

1 x 11.15
m2

m2

m2

3.65 x 1 x 2 LTot = L1 + L2 + L3 + L4
m2 = 30.7 m2
Luas B. Induk Tanpa Selasar dan Teras + L. Tirisan
+ ( 16.65 + 30.07 ) L = ### m2

Tugas Besar Rencana Anggaran dan Biaya 82


an Pekerjaan dan Perhitungan Volume Pekerjaan Satuan

L. Total Plafon x Koefisien Plafon L = 1.835 m2


x 0.014

(6.5x2)+((4x2)x3)+6.5+7.5+(3.5x2)+(3.5x2)+1+1+2
+0.5+3+2.5+((3.5x2)x4)+(3.5x4)+(2x2)+2 L = PD + K
m = ### m'
3.5+0.5+3.5+8.5+1+1+3.5+3.5+4+6.5+4
m

Tugas Besar Rencana Anggaran dan Biaya 83


an Pekerjaan dan Perhitungan Volume Pekerjaan Satuan

Tugas Besar Rencana Anggaran dan Biaya 84


an Pekerjaan dan Perhitungan Volume Pekerjaan Satuan

aan Lantai

m2

Luas B. Induk Tanpa A = 89 m2


Selasar dan KM

m2
Luasan Selasar A = 5.25 m2

Luas Pasangan Tegel Keramik A = 94.25 m2

ada KM/WC
m2
Luasan KM/WC A =3 m2

Tugas Besar Rencana Anggaran dan Biaya 85


an Pekerjaan dan Perhitungan Volume Pekerjaan Satuan

b(m) t(m) A ( m2 ) A =(2xA)+(a+b)


1 0.1 2.95 = 9.85 m2

h(m) t(m) n ( unit ) A =(2xb+h)xtxn


0.8 0.1 2 = 0.56 m2

b(m) t(m) A ( m2 ) A =(2xA)+(a+b)


1 0.1 0.75 = 3.25 m2

h(m) t(m) n ( unit ) A =(2xb+h)xtxn


1.2 0.1 4 = 1.08 m2

PP3 ( m ) h(m) A = ( PP3 - Lw ) x h


107 2.5 = 250 m2

Tugas Besar Rencana Anggaran dan Biaya 86


an Pekerjaan dan Perhitungan Volume Pekerjaan Satuan

as Pasangan Tegel Porselin 10/20 A = 265 m2

m
m
m A = ( DD + DL ) - PD
= 56.66 m'

Tugas Besar Rencana Anggaran dan Biaya 87


an Pekerjaan dan Perhitungan Volume Pekerjaan Satuan

Tugas Besar Rencana Anggaran dan Biaya 88


an Pekerjaan dan Perhitungan Volume Pekerjaan Satuan

alasi Listrik dan Air


=9 buah
=3 buah
=9 buah
=4 buah
=6 buah
=1 buah
=2 buah
=4 buah
=1 buah
=1 buah
=1 buah
=1 buah
=3 buah
=1 buah
=1 buah
=1 m'
=1 m'
=1 m'
=1 m'
=1 buah
= 43.65 m

Tugas Besar Rencana Anggaran dan Biaya 89


an Pekerjaan dan Perhitungan Volume Pekerjaan Satuan

an Finishing

Luas Acian Tembok A = ### m2

Luas Plafon A = ### m2

L ( m' ) h(m) Unit A =A-(Lxh)xn


5.22 0.12 1 = 1.516 m2
8.82 0.12 1 = 2.104 m2
5.12 0.12 1 = 1.318 m2
5.88 0.12 1 = 1.402 m2
5.12 0.12 1 = 1.318 m2
0 0.12 1 = 1.488 m2
0 0.12 4 = 7.728 m2
5.02 0.12 1 = 1.12 m2
0 0.12 1 = 3.264 m2
0 0.12 2 = 4.42 m2
0 0.12 1 = 0.686 m2
ATot = 26.36 m2

Tugas Besar Rencana Anggaran dan Biaya 90


an Pekerjaan dan Perhitungan Volume Pekerjaan Satuan

h(m) L ( m' ) A =((b+h)xL


0.2 170.83 = 39.29 m2

L (m') A =bxL
138.50 = 4.155 m2

Total Cat Kayu A = ### m2

Total Luas Pasangan Daun Pintu dan Jendela x 2 A = 48 m2

Luas Total Pasangan Atap Seng A = 35.88 m2

Tugas Besar Rencana Anggaran dan Biaya 91


an Pekerjaan dan Perhitungan Volume Pekerjaan Satuan

Tugas Besar Rencana Anggaran dan Biaya 92


an Pekerjaan dan Perhitungan Volume Pekerjaan Satuan

antung dan Pengunci

=7 buah
=1 buah
= 16 buah
= 21 buah
=2 buah
= 32 buah
= 32 buah
=1 buah
=1 LS

cktank dan Resapan

h(m) L(m) V =(bxh)xL


2 2 VS = 4 m3
2 1.5 VR 3 m3

Volume Total Galian Tanah V =7 m3

ank dan Resapan

Tugas Besar Rencana Anggaran dan Biaya 93


an Pekerjaan dan Perhitungan Volume Pekerjaan Satuan

V = 1 Volume Total
m3 3 Galian Tanah
= 2.33 m3

h(m) L ( m) V =(bxh)xL
0.05 1 = 0.053 m3

h(m) L ( m) V =(bxh)xL
0.4 1 = 0.42 m3

h(m) L ( m) V =(bxh)xL
0.4 1 = 0.42 m3

h(m) L ( m) V =(bxh)xL
0.3 1 = 0.315 m3

h(m) L ( m) V =(bxh)xL

Tugas Besar Rencana Anggaran dan Biaya 94


an Pekerjaan dan Perhitungan Volume Pekerjaan Satuan
0.38 1 = 0.524 m3

b(m) t(m) L(m) V = a+b


txL
0.2 1.7 1 2
= 0.468 m3
pc : 3 psr : 5 kr )
h(m) t(m) V =bxhxt
2 0.2 = 0.4 m3

3 psr : 5 kr )
h(m) t(m) V =bxhxt
1.5 0.2 = 0.3 m3

h(m) t(m) n ( unit ) V =(bxhxt)xn


0.2 2 4 = 0.24 m3
0.2 0.82 2 = 0.049 m3
0.2 2 4 = 0.24 m3
VTot = 0.529 m3
5 psr ) Untuk Resapan
L(m) A =hxL
5 =8 m2

Tugas Besar Rencana Anggaran dan Biaya 95


an Pekerjaan dan Perhitungan Volume Pekerjaan Satuan

5 psr ) Untuk Resapan


n A =Axt
2 = 16 m2

pc : 3 psr ) Untuk Septicktank


L(m) A =hxL
6 = 9.6 m2

pc : 3 psr ) Untuk Septicktank


n A =Axt
2 = 19.2 m2

Tugas Besar Rencana Anggaran dan Biaya 96


an Pekerjaan dan Perhitungan Volume Pekerjaan Satuan

rjaan Besi

40x40 mm )
m
m A =axh
= 7.378 m2

an Lain - Lain

=1 Ls

Tugas Besar Rencana Anggaran dan Biaya 97


ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : Pembanguan Rumah Tinggal


TAHUN ANGGARAN : 2017

Jenis Pekerjaan : Pembersihan 1 m2 Lapangan


Satuan : m2
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
Pekerja OH 0.100 Rp 52,000.00 Rp 5,200.00
Mandor OH 0.050 Rp 72,000.00 Rp 3,600.00
JUMLAH TENAGA KERJA Rp 8,800.00
B BAHAN
C ALAT
D Jumlah ( A + B + C ) Rp 8,800.00
E Overhead dan Profit 15% Rp 1,320.00
F Harga Satuan Pekerjaan ( D + E ) Rp 10,120.00

Jenis Pekerjaan : Pekerjaan Pemasangan Bouwplank 1 m'


Satuan : m'
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
Pekerja OH 0.100 Rp 52,000.00 Rp 5,200.00
Tukang Kayu OH 0.100 Rp 58,000.00 Rp 5,800.00
Kepala Tukang OH 0.010 Rp 65,000.00 Rp 650.00
Mandor OH 0.005 Rp 72,000.00 Rp 360.00
JUMLAH TENAGA KERJA Rp 12,010.00
B BAHAN
Kayu Usuk Kelas II m3 0.120 Rp 2,700,000.00 Rp 324,000.00
Paku Biasa Kg 0.020 Rp 20,000.00 Rp 400.00
Kayu Papan Kelas II m 3
0.007 Rp 3,000,000.00 Rp 21,000.00
JUMLAH HARGA BAHAN Rp 345,400.00
C ALAT
D Jumlah ( A + B + C ) Rp 357,410.00
E Overhead dan Profit 15% Rp 53,611.50
F Harga Satuan Pekerjaan ( D + E ) Rp 411,021.50

Jenis Pekerjaan : Penggalian 1 m3 Tanah Biasa Untuk Pondasi Sedalam 1 m


Satuan : m3
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA

Tugas Besar Rencana Anggaran dan Biaya 2017 99


ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : Pembanguan Rumah Tinggal


TAHUN ANGGARAN : 2017
Pekerja OH 0.750 Rp 52,000.00 Rp 39,000.00
Mandor OH 0.025 Rp 72,000.00 Rp 1,800.00
JUMLAH TENAGA KERJA Rp 40,800.00
B BAHAN
C ALAT
D Jumlah ( A + B + C ) Rp 40,800.00
E Overhead dan Profit 15% Rp 6,120.00
F Harga Satuan Pekerjaan ( D + E ) Rp 46,920.00

Jenis Pekerjaan : Pegurungan Kembali 1 m3 Galian Tanah


Satuan : m3
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
Pekerja OH 0.500 Rp 52,000.00 Rp 26,000.00
Mandor OH 0.050 Rp 72,000.00 Rp 3,600.00
JUMLAH TENAGA KERJA Rp 29,600.00
B BAHAN
C ALAT
D Jumlah ( A + B + C ) Rp 29,600.00
E Overhead dan Profit 15% Rp 4,440.00
F Harga Satuan Pekerjaan ( D + E ) Rp 34,040.00

Jenis Pekerjaan : Pengurugan 1 m3 Dengan Pasir Urug ( Bawah Pondasi )


Satuan : m3
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
Pekerja OH 0.300 Rp 52,000.00 Rp 15,600.00
Mandor OH 0.010 Rp 72,000.00 Rp 720.00
JUMLAH TENAGA KERJA Rp 16,320.00
B BAHAN
Pasir Urug m3 1.200 Rp 150,000.00 Rp 180,000.00
JUMLAH HARGA BAHAN Rp 180,000.00
C ALAT
D Jumlah ( A + B + C ) Rp 196,320.00
E Overhead dan Profit 15% Rp 29,448.00
F Harga Satuan Pekerjaan ( D + E ) Rp 225,768.00

Tugas Besar Rencana Anggaran dan Biaya 2017 100


ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : Pembanguan Rumah Tinggal


TAHUN ANGGARAN : 2017
Jenis Pekerjaan : Pengurugan 1 m3 Dengan Pasir Urug ( Bawah Lantai )
Satuan : m3
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
Pekerja OH 0.300 Rp 52,000.00 Rp 15,600.00
Mandor OH 0.010 Rp 72,000.00 Rp 720.00
JUMLAH TENAGA KERJA Rp 16,320.00
B BAHAN
Pasir Urug m3 1.200 Rp 150,000.00 Rp 180,000.00
JUMLAH HARGA BAHAN Rp 180,000.00
C ALAT
D Jumlah ( A + B + C ) Rp 196,320.00
E Overhead dan Profit 15% Rp 29,448.00
F Harga Satuan Pekerjaan ( D + E ) Rp 225,768.00

Jenis Pekerjaan : Pekerjaan Pemasangan 1 m3 Batu Kosong ( Aanstamping )


Satuan : m3
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
Pekerja OH 0.780 Rp 52,000.00 Rp 40,560.00
Tukang Batu OH 0.390 Rp 58,000.00 Rp 22,620.00
Kepala Tukang OH 0.039 Rp 65,000.00 Rp 2,535.00
Mandor OH 0.039 Rp 72,000.00 Rp 2,808.00
JUMLAH TENAGA KERJA Rp 68,523.00
B BAHAN
Batu Belah m3 1.200 Rp 120,000.00 Rp 144,000.00
Pasir Urug m 3
0.432 Rp 150,000.00 Rp 64,800.00
JUMLAH HARGA BAHAN Rp 208,800.00
C ALAT
D Jumlah ( A + B + C ) Rp 277,323.00
E Overhead dan Profit 15% Rp 41,598.45
F Harga Satuan Pekerjaan ( D + E ) Rp 318,921.45

Jenis Pekerjaan : Pekerjaan Pemasangan 1 m3 Pondasi Batu Belah , Campuran 1 pc : 5 pp

Tugas Besar Rencana Anggaran dan Biaya 2017 101


ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : Pembanguan Rumah Tinggal


TAHUN ANGGARAN : 2017
Satuan : m3
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
Pekerja OH 0.780 Rp 52,000.00 Rp 40,560.00
Tukang Batu OH 0.390 Rp 58,000.00 Rp 22,620.00
Kepala Tukang OH 0.039 Rp 65,000.00 Rp 2,535.00
Mandor OH 0.039 Rp 72,000.00 Rp 2,808.00
JUMLAH TENAGA KERJA Rp 68,523.00
B BAHAN
Batu Belah m3 1.200 Rp 120,000.00 Rp 144,000.00
Pasir Urug m3 0.432 Rp 150,000.00 Rp 64,800.00
JUMLAH HARGA BAHAN Rp 208,800.00
C ALAT
D Jumlah ( A + B + C ) Rp 277,323.00
E Overhead dan Profit 15% Rp 41,598.45
F Harga Satuan Pekerjaan ( D + E ) Rp 318,921.45

Jenis Pekerjaan : Pekerjaan Pemasangan 1 m2 Dinding Bata Merah ( 5 x 11 x 12 ) cm tebal 1 Batu


Campuran 1 pc : 3 pp ( Tembok Trasram )
Satuan : m2
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
Pekerja OH 0.600 Rp 52,000.00 Rp 31,200.00
Tukang Batu OH 0.200 Rp 58,000.00 Rp 11,600.00
Kepala Tukang OH 0.020 Rp 65,000.00 Rp 1,300.00
Mandor OH 0.030 Rp 72,000.00 Rp 2,160.00

Tugas Besar Rencana Anggaran dan Biaya 2017 102


ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : Pembanguan Rumah Tinggal


TAHUN ANGGARAN : 2017
JUMLAH TENAGA KERJA Rp 46,260.00
B BAHAN
Bata Merah Buah 140.000 Rp 1,000.00 Rp 140,000.00
Semen Portland Kg 32.950 Rp 1,200.00 Rp 39,540.00
Pasir Pasang m 3
0.091 Rp 212,500.00 Rp 19,337.50
JUMLAH HARGA BAHAN Rp 198,877.50
C ALAT
D Jumlah ( A + B + C ) Rp 245,137.50
E Overhead dan Profit 15% Rp 36,770.63
F Harga Satuan Pekerjaan ( D + E ) Rp 281,908.13

Jenis Pekerjaan : Pekerjaan Pemasangan 1 m2 Dinding Bata Merah ( 5 x 11 x 12 ) cm tebal 1 Batu


Campuran 1 pc : 5 pp ( Tembok Biasa )
Satuan : m2
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
Pekerja OH 0.600 Rp 52,000.00 Rp 31,200.00
Tukang Batu OH 0.200 Rp 58,000.00 Rp 11,600.00
Kepala Tukang OH 0.020 Rp 65,000.00 Rp 1,300.00
Mandor OH 0.030 Rp 72,000.00 Rp 2,160.00
JUMLAH TENAGA KERJA Rp 46,260.00
B BAHAN
Bata Merah Buah 140.000 Rp 1,000.00 Rp 140,000.00
Semen Portland Kg 22.200 Rp 1,200.00 Rp 26,640.00
Pasir Pasang m 3
0.102 Rp 212,500.00 Rp 21,675.00
JUMLAH HARGA BAHAN Rp 188,315.00
C ALAT
D Jumlah ( A + B + C ) Rp 234,575.00
E Overhead dan Profit 15% Rp 35,186.25
F Harga Satuan Pekerjaan ( D + E ) Rp 269,761.25

Tugas Besar Rencana Anggaran dan Biaya 2017 103


ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : Pembanguan Rumah Tinggal


TAHUN ANGGARAN : 2017
Jenis Pekerjaan : Pekerjaan Pemasangan 1 m2 Plesteran 1 pc : 3 pp ( Tembok Trasram )
Tebal 20 mm
Satuan : m2
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
Pekerja OH 0.260 Rp 52,000.00 Rp 13,520.00
Tukang Batu OH 0.200 Rp 58,000.00 Rp 11,600.00
Kepala Tukang OH 0.020 Rp 65,000.00 Rp 1,300.00
Mandor OH 0.013 Rp 72,000.00 Rp 936.00
JUMLAH TENAGA KERJA Rp 27,356.00
B BAHAN
Semen Portland Kg 10.368 Rp 1,200.00 Rp 12,441.60
Pasir Pasang m 3
0.031 Rp 212,500.00 Rp 6,587.50
JUMLAH HARGA BAHAN Rp 19,029.10
C ALAT
D Jumlah ( A + B + C ) Rp 46,385.10
E Overhead dan Profit 15% Rp 6,957.77
F Harga Satuan Pekerjaan ( D + E ) Rp 53,342.87

Jenis Pekerjaan : Pekerjaan Pemasangan 1 m2 Plesteran 1 pc : 5 pp ( Tembok Biasa )Tebal 20 mm


Satuan : m2
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
Pekerja OH 0.400 Rp 52,000.00 Rp 20,800.00
Tukang Batu OH 0.200 Rp 58,000.00 Rp 11,600.00
Kepala Tukang OH 0.020 Rp 65,000.00 Rp 1,300.00
Mandor OH 0.022 Rp 72,000.00 Rp 1,584.00
JUMLAH TENAGA KERJA Rp 35,284.00
B BAHAN
Semen Portland Kg 6.912 Rp 1,200.00 Rp 8,294.40
Pasir Pasang m 3
0.035 Rp 212,500.00 Rp 7,437.50
JUMLAH HARGA BAHAN Rp 15,731.90
C ALAT
D Jumlah ( A + B + C ) Rp 51,015.90
E Overhead dan Profit 15% Rp 7,652.39
F Harga Satuan Pekerjaan ( D + E ) Rp 58,668.29

Tugas Besar Rencana Anggaran dan Biaya 2017 104


ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : Pembanguan Rumah Tinggal


TAHUN ANGGARAN : 2017

Jenis Pekerjaan : Pekerjaan Pemasangan 1 m2 Plesteran 1 pc : 4 pp ( Pondasi Tepi Luar )


Tebal 20 mm
Satuan : m2
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
Pekerja OH 0.400 Rp 52,000.00 Rp 20,800.00
Tukang Batu OH 0.200 Rp 58,000.00 Rp 11,600.00
Kepala Tukang OH 0.020 Rp 65,000.00 Rp 1,300.00
Mandor OH 0.022 Rp 72,000.00 Rp 1,584.00
JUMLAH TENAGA KERJA Rp 35,284.00
B BAHAN
Semen Portland Kg 8.320 Rp 1,200.00 Rp 9,984.00
Pasir Pasang m 3
0.032 Rp 212,500.00 Rp 6,800.00
JUMLAH HARGA BAHAN Rp 16,784.00
C ALAT
D Jumlah ( A + B + C ) Rp 52,068.00
E Overhead dan Profit 15% Rp 7,810.20
F Harga Satuan Pekerjaan ( D + E ) Rp 59,878.20

Jenis Pekerjaan : Pekerjaan Pemasangan 1 m2 Acian Tembok


Satuan : m2
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
Pekerja OH 0.200 Rp 52,000.00 Rp 10,400.00
Tukang Batu OH 0.100 Rp 58,000.00 Rp 5,800.00
Kepala Tukang OH 0.010 Rp 65,000.00 Rp 650.00
Mandor OH 0.010 Rp 72,000.00 Rp 720.00
JUMLAH TENAGA KERJA Rp 17,570.00
B BAHAN

Tugas Besar Rencana Anggaran dan Biaya 2017 105


ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : Pembanguan Rumah Tinggal


TAHUN ANGGARAN : 2017
Semen Portland Kg 3.250 Rp 1,200.00 Rp 3,900.00
JUMLAH HARGA BAHAN Rp 3,900.00
C ALAT
D Jumlah ( A + B + C ) Rp 21,470.00
E Overhead dan Profit 15% Rp 3,220.50
F Harga Satuan Pekerjaan ( D + E ) Rp 24,690.50

Jenis Pekerjaan : Pekerjaan Pemasangan 1 m3 Cor Beton Sloof


Satuan : m3
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
Pekerja OH 5.650 Rp 52,000.00 Rp 293,800.00
Tukang Batu OH 0.275 Rp 58,000.00 Rp 15,950.00
Tukang Kayu OH 1.560 Rp 58,000.00 Rp 90,480.00
Tukang Besi OH 1.400 Rp 58,000.00 Rp 81,200.00
Kepala Tukang OH 0.323 Rp 65,000.00 Rp 20,995.00
Mandor OH 0.283 Rp 72,000.00 Rp 20,376.00
JUMLAH TENAGA KERJA Rp 522,801.00
B BAHAN
Kayu Kelas III m3 0.270 Rp 2,000,000.00 Rp 540,000.00
Paku 5- 12 cm kg 2.000 Rp 20,000.00 Rp 40,000.00
Minyak Bekisting Liter 0.600 Rp 3,000.00 Rp 1,800.00
Besi Beton Polos kg 210.000 Rp 11,000.00 Rp 2,310,000.00
Kawat Beton kg 3.000 Rp 25,000.00 Rp 75,000.00
Semen Portland Kg 336.000 Rp 1,200.00 Rp 403,200.00
Pasir Beton m 3
0.540 Rp 212,500.00 Rp 114,750.00

Tugas Besar Rencana Anggaran dan Biaya 2017 106


ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : Pembanguan Rumah Tinggal


TAHUN ANGGARAN : 2017
Kerikil m3 0.810 Rp 150,000.00 Rp 121,500.00
JUMLAH HARGA BAHAN Rp 3,606,250.00
C ALAT
D Jumlah ( A + B + C ) Rp 4,129,051.00
E Overhead dan Profit 15% Rp 619,357.65
F Harga Satuan Pekerjaan ( D + E ) Rp 4,748,408.65

Jenis Pekerjaan : Pekerjaan Pemasangan 1 m3 Cor Beton Kolom


Satuan : m3
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
Pekerja OH 5.300 Rp 52,000.00 Rp 275,600.00
Tukang Batu OH 0.275 Rp 58,000.00 Rp 15,950.00
Tukang Kayu OH 1.300 Rp 58,000.00 Rp 75,400.00
Tukang Besi OH 1.500 Rp 58,000.00 Rp 87,000.00
Kepala Tukang OH 0.265 Rp 65,000.00 Rp 17,225.00
Mandor OH 0.265 Rp 72,000.00 Rp 19,080.00

Tugas Besar Rencana Anggaran dan Biaya 2017 107


ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : Pembanguan Rumah Tinggal


TAHUN ANGGARAN : 2017
JUMLAH TENAGA KERJA Rp 490,255.00
B BAHAN
Kayu Balok Kelas II m3 0.120 Rp 3,000,000.00 Rp 360,000.00
Kayu Kelas III m 3
0.320 Rp 2,000,000.00 Rp 640,000.00
Paku 5- 12 cm kg 3.200 Rp 20,000.00 Rp 64,000.00
Minyak Bekisting Liter 1.600 Rp 3,000.00 Rp 4,800.00
Besi Beton Polos kg 157.500 Rp 11,000.00 Rp 1,732,500.00
Kawat Beton kg 2.250 Rp 25,000.00 Rp 56,250.00
Semen Portland Kg 336.000 Rp 1,200.00 Rp 403,200.00
Pasir Beton m3 0.540 Rp 212,500.00 Rp 114,750.00
Kerikil m3 0.810 Rp 150,000.00 Rp 121,500.00
Dolken Kayu btg 3.200 Rp 4,000.00 Rp 12,800.00
Plywood 9 mm lbr 2.800 Rp 100,000.00 Rp 280,000.00
JUMLAH HARGA BAHAN Rp 3,789,800.00
C ALAT
D Jumlah ( A + B + C ) Rp 4,280,055.00
E Overhead dan Profit 15% Rp 642,008.25
F Harga Satuan Pekerjaan ( D + E ) Rp 4,922,063.25

Jenis Pekerjaan : Pekerjaan Pemasangan 1 m3 Cor Balok Beton Bertulang

Tugas Besar Rencana Anggaran dan Biaya 2017 108


ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : Pembanguan Rumah Tinggal


TAHUN ANGGARAN : 2017
Satuan : m3
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
Pekerja OH 6.350 Rp 52,000.00 Rp 330,200.00
Tukang Batu OH 0.275 Rp 58,000.00 Rp 15,950.00
Tukang Kayu OH 1.650 Rp 58,000.00 Rp 95,700.00
Tukang Besi OH 1.400 Rp 58,000.00 Rp 81,200.00
Kepala Tukang OH 0.333 Rp 65,000.00 Rp 21,645.00
Mandor OH 0.318 Rp 72,000.00 Rp 22,896.00
JUMLAH TENAGA KERJA Rp 567,591.00
B BAHAN
Kayu Kelas III m3 0.320 Rp 2,000,000.00 Rp 640,000.00
Paku 5- 12 cm kg 3.200 Rp 20,000.00 Rp 64,000.00
Minyak Bekisting Liter 1.600 Rp 3,000.00 Rp 4,800.00
Besi Beton Polos kg 210.000 Rp 11,000.00 Rp 2,310,000.00
Kawat Beton kg 3.000 Rp 25,000.00 Rp 75,000.00
Semen Portland Kg 336.000 Rp 1,200.00 Rp 403,200.00
Pasir Beton m3 0.540 Rp 212,500.00 Rp 114,750.00
Kerikil m3 0.810 Rp 150,000.00 Rp 121,500.00
Kayu Kelas II Balok m3 0.140 Rp 2,700,000.00 Rp 378,000.00
Plywood 9 mm Lbr 2.800 Rp 100,000.00 Rp 280,000.00
Dolken Kayu btg 16.000 Rp 4,000.00 Rp 64,000.00
JUMLAH HARGA BAHAN Rp 4,455,250.00
C ALAT
D Jumlah ( A + B + C ) Rp 5,022,841.00
E Overhead dan Profit 15% Rp 753,426.15
F Harga Satuan Pekerjaan ( D + E ) Rp 5,776,267.15

Tugas Besar Rencana Anggaran dan Biaya 2017 109


ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : Pembanguan Rumah Tinggal


TAHUN ANGGARAN : 2017

Jenis Pekerjaan : Pekerjaan Pemasangan 1 m3 Plat Beton Bertulang


Satuan : m3
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
Pekerja OH 5.300 Rp 52,000.00 Rp 275,600.00
Tukang Batu OH 0.275 Rp 58,000.00 Rp 15,950.00
Tukang Kayu OH 1.300 Rp 58,000.00 Rp 75,400.00
Tukang Besi OH 1.050 Rp 58,000.00 Rp 60,900.00
Kepala Tukang OH 0.265 Rp 65,000.00 Rp 17,225.00
Mandor OH 0.265 Rp 72,000.00 Rp 19,080.00
JUMLAH TENAGA KERJA Rp 464,155.00
B BAHAN
Kayu Kelas III m3 0.320 Rp 2,000,000.00 Rp 640,000.00
Kayu Kelas II Balok m3 0.120 Rp 2,700,000.00 Rp 324,000.00
Paku 5- 12 cm kg 3.200 Rp 20,000.00 Rp 64,000.00
Minyak Bekisting Liter 1.600 Rp 3,000.00 Rp 4,800.00
Besi Beton Polos kg 157.500 Rp 11,000.00 Rp 1,732,500.00
Kawat Beton kg 2.250 Rp 25,000.00 Rp 56,250.00
Semen Portland Kg 336.000 Rp 1,200.00 Rp 403,200.00
Pasir Beton m3 0.540 Rp 212,500.00 Rp 114,750.00
Kerikil m3 0.810 Rp 150,000.00 Rp 121,500.00
Plywood 9 mm lbr 2.800 Rp 100,000.00 Rp 280,000.00
Dolken Kayu btg 32.000 Rp 4,000.00 Rp 128,000.00
JUMLAH HARGA BAHAN Rp 3,869,000.00
C ALAT
D Jumlah ( A + B + C ) Rp 4,333,155.00
E Overhead dan Profit 15% Rp 649,973.25
F Harga Satuan Pekerjaan ( D + E ) Rp 4,983,128.25

Jenis Pekerjaan : Pekerjaan Pemasangan 1 m3 Kusen Pintu dan Kusen Jendela Kayu Kelas I

Tugas Besar Rencana Anggaran dan Biaya 2017 110


ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : Pembanguan Rumah Tinggal


TAHUN ANGGARAN : 2017
Satuan : m3
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
Pekerja OH 7.000 Rp 52,000.00 Rp 364,000.00
Tukang Kayu OH 21.000 Rp 58,000.00 Rp 1,218,000.00
Kepala Tukang OH 2.100 Rp 65,000.00 Rp 136,500.00
Mandor OH 0.350 Rp 72,000.00 Rp 25,200.00
JUMLAH TENAGA KERJA Rp 1,743,700.00
B BAHAN
Balok Kayu m3 1.100 Rp 3,500,000.00 Rp 3,850,000.00
Paku 10 cm kg 1.250 Rp 20,000.00 Rp 25,000.00
Lem Kayu kg 1.000 Rp 30,000.00 Rp 30,000.00
JUMLAH HARGA BAHAN Rp 3,905,000.00
C ALAT
D Jumlah ( A + B + C ) Rp 5,648,700.00
E Overhead dan Profit 15% Rp 847,305.00
F Harga Satuan Pekerjaan ( D + E ) Rp 6,496,005.00

Jenis Pekerjaan : Pekerjaan Pemasangan 1 m' Kusen Pintu Alumunium


Satuan : m'
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
Pekerja OH 0.043 Rp 52,000.00 Rp 2,236.00
Tukang Khusus
OH 0.043 Rp 58,000.00 Rp 2,494.00
Alumunium
Kepala Tukang OH 0.0043 Rp 65,000.00 Rp 279.50
Mandor OH 0.0021 Rp 72,000.00 Rp 151.20
JUMLAH TENAGA KERJA Rp 5,160.70
B BAHAN
Profil Alumunium m' 1.100 Rp 75,000.00 Rp 82,500.00
Sekrup Fixer buah 2.000 Rp 1,500.00 Rp 3,000.00
Sealent Tube 0.060 Rp 12,500.00 Rp 750.00
JUMLAH HARGA BAHAN Rp 86,250.00
C ALAT
D Jumlah ( A + B + C ) Rp 91,410.70
E Overhead dan Profit 15% Rp 13,711.61
F Harga Satuan Pekerjaan ( D + E ) Rp 105,122.31

Jenis Pekerjaan : Pekerjaan Pemasangan 1 m2 Daun Pintu dan Jendela Plywood rangkap, Rangka

Tugas Besar Rencana Anggaran dan Biaya 2017 111


ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : Pembanguan Rumah Tinggal


TAHUN ANGGARAN : 2017
Kayu Kelas II Tertutup
Satuan : m2
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
Pekerja OH 0.700 Rp 52,000.00 Rp 36,400.00
Tukang Kayu OH 2.100 Rp 58,000.00 Rp 121,800.00
Kepala Tukang OH 0.210 Rp 65,000.00 Rp 13,650.00
Mandor OH 0.035 Rp 72,000.00 Rp 2,520.00
JUMLAH TENAGA KERJA Rp 174,370.00
B BAHAN
Papan Kayu m3 0.025 Rp 3,000,000.00 Rp 75,000.00
Paku 1 - 2.5 cm kg 0.030 Rp 20,000.00 Rp 600.00
Lem Kayu kg 0.500 Rp 30,000.00 Rp 15,000.00
Plywood Tebal
lbr 1.000 Rp 60,000.00 Rp 60,000.00
4 mm
JUMLAH HARGA BAHAN Rp 150,600.00
C ALAT
D Jumlah ( A + B + C ) Rp 324,970.00
E Overhead dan Profit 15% Rp 48,745.50
F Harga Satuan Pekerjaan ( D + E ) Rp 373,715.50

Jenis Pekerjaan : Pekerjaan Pemasangan 1 m2 Kaca Polos 5 mm


Satuan : m2
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
Pekerja OH 0.015 Rp 52,000.00 Rp 780.00
Tukang Kayu OH 0.150 Rp 58,000.00 Rp 8,700.00
Kepala Tukang OH 0.015 Rp 65,000.00 Rp 975.00
Mandor OH 0.0008 Rp 72,000.00 Rp 57.60
JUMLAH TENAGA KERJA Rp 10,512.60
B BAHAN

Tugas Besar Rencana Anggaran dan Biaya 2017 112


ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : Pembanguan Rumah Tinggal


TAHUN ANGGARAN : 2017
Kaca Tebal 5 mm m2 1.100 Rp 95,500.00 Rp 105,050.00
Sealent Kg 0.050 Rp 25,000.00 Rp 1,250.00
JUMLAH HARGA BAHAN Rp 106,300.00
C ALAT
D Jumlah ( A + B + C ) Rp 116,812.60
E Overhead dan Profit 15% Rp 17,521.89
F Harga Satuan Pekerjaan ( D + E ) Rp 134,334.49

Jenis Pekerjaan : Pekerjaan Pemasangan 1 m3 Kontruksi Gording, Kayu Kelas II


Satuan : m3
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
Pekerja OH 2.400 Rp 52,000.00 Rp 124,800.00
Tukang Kayu OH 7.200 Rp 58,000.00 Rp 417,600.00
Kepala Tukang OH 0.720 Rp 65,000.00 Rp 46,800.00
Mandor OH 0.1200 Rp 72,000.00 Rp 8,640.00
JUMLAH TENAGA KERJA Rp 597,840.00
B BAHAN
Balok Kayu m3 1.100 Rp 2,700,000.00 Rp 2,970,000.00
Besi Strip Tebal 5 mm kg 15.000 Rp 15,000.00 Rp 15,000.00
Paku 12 cm kg 3.000 Rp 20,000.00 Rp 60,000.00
JUMLAH HARGA BAHAN Rp 3,045,000.00
C ALAT
D Jumlah ( A + B + C ) Rp 3,642,840.00
E Overhead dan Profit 15% Rp 546,426.00
F Harga Satuan Pekerjaan ( D + E ) Rp 4,189,266.00

Jenis Pekerjaan : Pekerjaan Pemasangan 1 m' Listplank, Kayu Kelas II

Tugas Besar Rencana Anggaran dan Biaya 2017 113


ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : Pembanguan Rumah Tinggal


TAHUN ANGGARAN : 2017
Satuan : m'
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
Pekerja OH 0.100 Rp 52,000.00 Rp 5,200.00
Tukang Kayu OH 0.200 Rp 58,000.00 Rp 11,600.00
Kepala Tukang OH 0.020 Rp 65,000.00 Rp 1,300.00
Mandor OH 0.0050 Rp 72,000.00 Rp 360.00
JUMLAH TENAGA KERJA Rp 18,460.00
B BAHAN
Papan Kayu m3 0.011 Rp 3,000,000.00 Rp 32,400.00
Paku 5- 7 cm kg 0.100 Rp 20,000.00 Rp 2,000.00
JUMLAH HARGA BAHAN Rp 34,400.00
C ALAT
D Jumlah ( A + B + C ) Rp 52,860.00
E Overhead dan Profit 15% Rp 7,929.00
F Harga Satuan Pekerjaan ( D + E ) Rp 60,789.00

Jenis Pekerjaan : Pekerjaan Pemasangan 1 m3 Kontruksi Kuda Kuda , Kayu Kelas I


Satuan : m3
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
Pekerja OH 4.000 Rp 52,000.00 Rp 208,000.00
Tukang Kayu OH 12.000 Rp 58,000.00 Rp 696,000.00
Kepala Tukang OH 1.200 Rp 65,000.00 Rp 78,000.00
Mandor OH 0.2000 Rp 72,000.00 Rp 14,400.00
JUMLAH TENAGA KERJA Rp 996,400.00
B BAHAN
Balok Kayu m3 1.100 Rp 3,500,000.00 Rp 3,850,000.00
Besi Strip Tebal 5 mm kg 15.000 Rp 15,000.00 Rp 15,000.00
Paku 12 cm kg 5.600 Rp 20,000.00 Rp 112,000.00
JUMLAH HARGA BAHAN Rp 3,977,000.00
C ALAT
D Jumlah ( A + B + C ) Rp 4,973,400.00
E Overhead dan Profit 15% Rp 746,010.00
F Harga Satuan Pekerjaan ( D + E ) Rp 5,719,410.00

Tugas Besar Rencana Anggaran dan Biaya 2017 114


ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : Pembanguan Rumah Tinggal


TAHUN ANGGARAN : 2017

Jenis Pekerjaan : Pekerjaan Pemasangan 1 m3 Kayu Balok Bumbungan, Kayu Kelas II


Satuan : m3
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
Pekerja OH 2.400 Rp 52,000.00 Rp 124,800.00
Tukang Kayu OH 7.200 Rp 58,000.00 Rp 417,600.00
Kepala Tukang OH 0.720 Rp 65,000.00 Rp 46,800.00
Mandor OH 0.1200 Rp 72,000.00 Rp 8,640.00
JUMLAH TENAGA KERJA Rp 597,840.00
B BAHAN
Balok Kayu m3 1.100 Rp 2,700,000.00 Rp 2,970,000.00
Besi Strip Tebal 5 mm kg 15.000 Rp 15,000.00 Rp 10,000.00
Paku 12 cm kg 3.000 Rp 20,000.00 Rp 60,000.00
JUMLAH HARGA BAHAN Rp 3,040,000.00
C ALAT
D Jumlah ( A + B + C ) Rp 3,637,840.00
E Overhead dan Profit 15% Rp 545,676.00
F Harga Satuan Pekerjaan ( D + E ) Rp 4,183,516.00

Jenis Pekerjaan : Pekerjaan Pemasangan 1 m2 Atap Seng Gelombang


Satuan : m2
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
Pekerja OH 0.120 Rp 52,000.00 Rp 6,240.00
Tukang Kayu OH 0.060 Rp 58,000.00 Rp 3,480.00
Kepala Tukang OH 0.006 Rp 65,000.00 Rp 390.00
Mandor OH 0.0060 Rp 72,000.00 Rp 432.00
JUMLAH TENAGA KERJA Rp 10,542.00
B BAHAN
Seng Gelombang 3"x6" lbr 0.700 Rp 62,500.00 Rp 43,750.00

Tugas Besar Rencana Anggaran dan Biaya 2017 115


ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : Pembanguan Rumah Tinggal


TAHUN ANGGARAN : 2017
Paku Biasa 1/2" - 1" kg 0.020 Rp 20,000.00 Rp 400.00
JUMLAH HARGA BAHAN Rp 44,150.00
C ALAT
D Jumlah ( A + B + C ) Rp 54,692.00
E Overhead dan Profit 15% Rp 8,203.80
F Harga Satuan Pekerjaan ( D + E ) Rp 62,895.80

Jenis Pekerjaan : Pekerjaan Pemasangan 1 m' Nok Atap Seng


Satuan : m'
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
Pekerja OH 0.150 Rp 52,000.00 Rp 7,800.00
Tukang Kayu OH 0.070 Rp 58,000.00 Rp 4,060.00
Kepala Tukang OH 0.007 Rp 65,000.00 Rp 455.00
Mandor OH 0.0060 Rp 72,000.00 Rp 432.00
JUMLAH TENAGA KERJA Rp 12,747.00
B BAHAN
Seng Pelat 3"x6" lbr 0.300 Rp 273,500.00 Rp 82,050.00
Paku Biasa 1/2" - 1" kg 0.400 Rp 20,000.00 Rp 8,000.00
JUMLAH HARGA BAHAN Rp 90,050.00
C ALAT
D Jumlah ( A + B + C ) Rp 102,797.00
E Overhead dan Profit 15% Rp 15,419.55
F Harga Satuan Pekerjaan ( D + E ) Rp 118,216.55

Jenis Pekerjaan : Pekerjaan Pemasangan 1 m2 Rangka Plafon


Satuan : m2
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Koefisien

Tugas Besar Rencana Anggaran dan Biaya 2017 116


ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : Pembanguan Rumah Tinggal


TAHUN ANGGARAN : 2017
No. Uraian Pekerjaan Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
Pekerja OH 0.150 Rp 52,000.00 Rp 7,800.00
Tukang Kayu OH 0.300 Rp 58,000.00 Rp 17,400.00
Kepala Tukang OH 0.030 Rp 65,000.00 Rp 1,950.00
Mandor OH 0.0750 Rp 72,000.00 Rp 5,400.00
JUMLAH TENAGA KERJA Rp 32,550.00
B BAHAN
Usuk 5x7 m3 0.014 Rp 2,000,000.00 Rp 28,000.00
Paku kg 0.200 Rp 20,000.00 Rp 4,000.00
JUMLAH HARGA BAHAN Rp 32,000.00
C ALAT
D Jumlah ( A + B + C ) Rp 64,550.00
E Overhead dan Profit 15% Rp 9,682.50
F Harga Satuan Pekerjaan ( D + E ) Rp 74,232.50

Jenis Pekerjaan : Pekerjaan Pemasangan 1 m2 Langit - Langit Tripleks Ukuran ( 120 x 240 cm ),
tebal 3mm , 4 mm dan 6 mm
Satuan : m2
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
Pekerja OH 0.100 Rp 52,000.00 Rp 5,200.00
Tukang Kayu OH 0.100 Rp 58,000.00 Rp 5,800.00
Kepala Tukang OH 0.010 Rp 65,000.00 Rp 650.00
Mandor OH 0.0500 Rp 72,000.00 Rp 3,600.00
JUMLAH TENAGA KERJA Rp 15,250.00
B BAHAN

Tugas Besar Rencana Anggaran dan Biaya 2017 117


ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : Pembanguan Rumah Tinggal


TAHUN ANGGARAN : 2017
Tripleks lbr 0.375 Rp 60,000.00 Rp 22,500.00
Paku Tripleks kg 0.030 Rp 20,000.00 Rp 600.00
JUMLAH HARGA BAHAN Rp 23,100.00
C ALAT
D Jumlah ( A + B + C ) Rp 38,350.00
E Overhead dan Profit 15% Rp 5,752.50
F Harga Satuan Pekerjaan ( D + E ) Rp 44,102.50

Jenis Pekerjaan : Pekerjaan Pemasangan 1 m List Langit - Langit Kayu Profil


Satuan : m'
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
Pekerja OH 0.050 Rp 52,000.00 Rp 2,600.00
Tukang Kayu OH 0.050 Rp 58,000.00 Rp 2,900.00
Kepala Tukang OH 0.005 Rp 65,000.00 Rp 325.00
Mandor OH 0.0030 Rp 72,000.00 Rp 216.00
JUMLAH TENAGA KERJA Rp 6,041.00
B BAHAN
List Kayu Profil m' 1.050 Rp 12,500.00 Rp 13,125.00
Paku kg 0.010 Rp 20,000.00 Rp 200.00
JUMLAH HARGA BAHAN Rp 13,325.00
C ALAT
D Jumlah ( A + B + C ) Rp 19,366.00
E Overhead dan Profit 15% Rp 2,904.90
F Harga Satuan Pekerjaan ( D + E ) Rp 22,270.90

Jenis Pekerjaan : Pekerjaan Pemasangan 1 m2 Lantai Keramik Ukuran 60 cm x 60 cm


Satuan : m2

Tugas Besar Rencana Anggaran dan Biaya 2017 118


ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : Pembanguan Rumah Tinggal


TAHUN ANGGARAN : 2017
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
Pekerja OH 0.700 Rp 52,000.00 Rp 36,400.00
Tukang Batu OH 0.350 Rp 58,000.00 Rp 20,300.00
Kepala Tukang OH 0.035 Rp 65,000.00 Rp 2,275.00
Mandor OH 0.0350 Rp 72,000.00 Rp 2,520.00
JUMLAH TENAGA KERJA Rp 61,495.00
B BAHAN
Ubin Keramik Dos 0.920 Rp 90,000.00 Rp 82,800.00
Semen Portland kg 10.000 Rp 1,200.00 Rp 12,000.00
Pasir Pasang m3 0.045 Rp 212,500.00 Rp 9,562.50
Semen Warna kg 0.500 Rp 4,500.00 Rp 2,250.00
JUMLAH HARGA BAHAN Rp 106,612.50
C ALAT
D Jumlah ( A + B + C ) Rp 168,107.50
E Overhead dan Profit 15% Rp 25,216.13
F Harga Satuan Pekerjaan ( D + E ) Rp 193,323.63

Jenis Pekerjaan : Pekerjaan Pemasangan 1 m2 Lantai Keramik Ukuran 30 cm x 30 cm


Satuan : m2
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
Pekerja OH 0.700 Rp 52,000.00 Rp 36,400.00
Tukang Batu OH 0.350 Rp 58,000.00 Rp 20,300.00
Kepala Tukang OH 0.035 Rp 65,000.00 Rp 2,275.00
Mandor OH 0.0350 Rp 72,000.00 Rp 2,520.00
JUMLAH TENAGA KERJA Rp 61,495.00
B BAHAN
Ubin Keramik Dos 1.050 Rp 55,000.00 Rp 57,750.00
Semen Portland kg 10.000 Rp 1,200.00 Rp 12,000.00
Pasir Pasang m 3
0.045 Rp 212,500.00 Rp 9,562.50
Semen Warna kg 0.500 Rp 4,500.00 Rp 2,250.00
JUMLAH HARGA BAHAN Rp 81,562.50
C ALAT
D Jumlah ( A + B + C ) Rp 143,057.50
E Overhead dan Profit 15% Rp 21,458.63
F Harga Satuan Pekerjaan ( D + E ) Rp 164,516.13

Tugas Besar Rencana Anggaran dan Biaya 2017 119


ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : Pembanguan Rumah Tinggal


TAHUN ANGGARAN : 2017

Jenis Pekerjaan : Pekerjaan Pemasangan 1 m2 Lantai Keramik Mozaik Ukuran 30 cm x 30 cm


Satuan : m2
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
Pekerja OH 0.700 Rp 52,000.00 Rp 36,400.00
Tukang Batu OH 0.350 Rp 58,000.00 Rp 20,300.00
Kepala Tukang OH 0.035 Rp 65,000.00 Rp 2,275.00
Mandor OH 0.0350 Rp 72,000.00 Rp 2,520.00
JUMLAH TENAGA KERJA Rp 61,495.00
B BAHAN
Ubin Keramik Dos 11.870 Rp 83,000.00 Rp 985,210.00
Semen Portland kg 14.150 Rp 1,200.00 Rp 16,980.00
Pasir Pasang m 3
0.039 Rp 212,500.00 Rp 8,287.50
Semen Warna kg 2.000 Rp 4,500.00 Rp 9,000.00
JUMLAH HARGA BAHAN Rp 1,019,477.50
C ALAT
D Jumlah ( A + B + C ) Rp 1,080,972.50
E Overhead dan Profit 15% Rp 162,145.88
F Harga Satuan Pekerjaan ( D + E ) Rp 1,243,118.38

Jenis Pekerjaan : Pekerjaan Pemasangan 1 m2 Dinding Porselin Ukuran 10 cm x 20 cm


Satuan : m2
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
Pekerja OH 0.900 Rp 52,000.00 Rp 46,800.00
Tukang Batu OH 0.450 Rp 58,000.00 Rp 26,100.00
Kepala Tukang OH 0.045 Rp 65,000.00 Rp 2,925.00
Mandor OH 0.0450 Rp 72,000.00 Rp 3,240.00
JUMLAH TENAGA KERJA Rp 79,065.00
B BAHAN
Porselin Buah 53.000 Rp 1,800.00 Rp 95,400.00
Semen Portland kg 9.300 Rp 1,200.00 Rp 11,160.00

Tugas Besar Rencana Anggaran dan Biaya 2017 120


ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : Pembanguan Rumah Tinggal


TAHUN ANGGARAN : 2017
Pasir Pasang m3 0.018 Rp 212,500.00 Rp 3,825.00
Semen Warna kg 2.750 Rp 4,500.00 Rp 12,375.00
JUMLAH HARGA BAHAN Rp 122,760.00
C ALAT
D Jumlah ( A + B + C ) Rp 201,825.00
E Overhead dan Profit 15% Rp 30,273.75
F Harga Satuan Pekerjaan ( D + E ) Rp 232,098.75

Jenis Pekerjaan : Pekerjaan Pemasangan 1 m' Plint keramik 10 cm x 20 cm


Satuan : m'
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
Pekerja OH 0.090 Rp 52,000.00 Rp 4,680.00
Tukang Batu OH 0.090 Rp 58,000.00 Rp 5,220.00
Kepala Tukang OH 0.009 Rp 65,000.00 Rp 585.00
Mandor OH 0.0050 Rp 72,000.00 Rp 360.00
JUMLAH TENAGA KERJA Rp 10,845.00
B BAHAN
Plint Keramik Artistik Buah 5.300 Rp 1,800.00 Rp 9,540.00
Semen Portland kg 1.140 Rp 1,200.00 Rp 1,368.00
Pasir Pasang m 3
0.003 Rp 212,500.00 Rp 637.50
Semen Warna kg 0.025 Rp 4,500.00 Rp 112.50
JUMLAH HARGA BAHAN Rp 11,658.00
C ALAT
D Jumlah ( A + B + C ) Rp 22,503.00
E Overhead dan Profit 15% Rp 3,375.45
F Harga Satuan Pekerjaan ( D + E ) Rp 25,878.45

Jenis Pekerjaan : Pekerjaan Pemasangan 1 Buah Wastafel


Satuan : Buah
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Koefisien
( Rp. ) ( Rp. )

Tugas Besar Rencana Anggaran dan Biaya 2017 121


ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : Pembanguan Rumah Tinggal


TAHUN ANGGARAN : 2017
A TENAGA
Pekerja OH 1.200 Rp 52,000.00 Rp 62,400.00
Tukang Batu OH 1.450 Rp 58,000.00 Rp 84,100.00
Kepala Tukang OH 0.150 Rp 65,000.00 Rp 9,750.00
Mandor OH 0.0600 Rp 72,000.00 Rp 4,320.00
JUMLAH TENAGA KERJA Rp 160,570.00
B BAHAN
Wastafel Unit 1.200 Rp 1,000,000.00 Rp 1,200,000.00
Semen Portland kg 6.000 Rp 1,200.00 Rp 7,200.00
Pasir Pasang m 3
0.010 Rp 212,500.00 Rp 2,125.00
Perlengkapan % 0.120 Rp 145,644.00 Rp 17,477.28
JUMLAH HARGA BAHAN Rp 1,226,802.28
C ALAT
D Jumlah ( A + B + C ) Rp 1,387,372.28
E Overhead dan Profit 15% Rp 208,105.84
F Harga Satuan Pekerjaan ( D + E ) Rp 1,595,478.12

Jenis Pekerjaan : Pekerjaan Pemasangan 1 Buah Closet Jongkok Porselin


Satuan : Buah
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
Pekerja OH 1.000 Rp 52,000.00 Rp 52,000.00
Tukang Batu OH 1.500 Rp 58,000.00 Rp 87,000.00
Kepala Tukang OH 0.150 Rp 65,000.00 Rp 9,750.00
Mandor OH 0.1600 Rp 72,000.00 Rp 11,520.00
JUMLAH TENAGA KERJA Rp 160,270.00
B BAHAN
Closet Jongkok Unit 1.000 Rp 150,000.00 Rp 150,000.00
Semen Portland kg 6.000 Rp 1,200.00 Rp 7,200.00
Pasir Pasang m 3
0.010 Rp 212,500.00 Rp 2,125.00
JUMLAH HARGA BAHAN Rp 159,325.00

Tugas Besar Rencana Anggaran dan Biaya 2017 122


ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : Pembanguan Rumah Tinggal


TAHUN ANGGARAN : 2017
C ALAT
D Jumlah ( A + B + C ) Rp 319,595.00
E Overhead dan Profit 15% Rp 47,939.25
F Harga Satuan Pekerjaan ( D + E ) Rp 367,534.25

Jenis Pekerjaan : Pekerjaan Pemasangan 1 Buah Kran Diameter 1/2" atau 3/4"
Satuan : Buah
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
Pekerja OH 0.010 Rp 52,000.00 Rp 520.00
Tukang Batu OH 0.400 Rp 58,000.00 Rp 23,200.00
Kepala Tukang OH 0.040 Rp 65,000.00 Rp 2,600.00
Mandor OH 0.0050 Rp 72,000.00 Rp 360.00
JUMLAH TENAGA KERJA Rp 26,680.00
B BAHAN
Kran M 1.000 Rp 40,000.00 Rp 40,000.00
Sealtape Buah 6.000 Rp 4,000.00 Rp 24,000.00
JUMLAH HARGA BAHAN Rp 64,000.00
C ALAT
D Jumlah ( A + B + C ) Rp 90,680.00
E Overhead dan Profit 15% Rp 13,602.00
F Harga Satuan Pekerjaan ( D + E ) Rp 104,282.00

Jenis Pekerjaan : Pekerjaan Pemasangan 1 Buah Bak Cuci Piring Stainlessteel


Satuan : Buah
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA

Tugas Besar Rencana Anggaran dan Biaya 2017 123


ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : Pembanguan Rumah Tinggal


TAHUN ANGGARAN : 2017
Pekerja OH 0.030 Rp 52,000.00 Rp 1,560.00
Tukang Batu OH 0.300 Rp 58,000.00 Rp 17,400.00
Kepala Tukang OH 0.030 Rp 65,000.00 Rp 1,950.00
Mandor OH 0.0150 Rp 72,000.00 Rp 1,080.00
JUMLAH TENAGA KERJA Rp 21,990.00
B BAHAN
Bak Cuci Piring Unit 1.000 Rp 1,300,000.00 Rp 1,300,000.00
Waterdrain Buah 1.000 Rp 20,000.00 Rp 20,000.00
JUMLAH HARGA BAHAN Rp 1,320,000.00
C ALAT
D Jumlah ( A + B + C ) Rp 1,341,990.00
E Overhead dan Profit 15% Rp 201,298.50
F Harga Satuan Pekerjaan ( D + E ) Rp 1,543,288.50

Jenis Pekerjaan : Pekerjaan Pemasangan 1 m' Pipa PVC Tipe AW Diameter 4"
Satuan m'
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
Pekerja OH 0.081 Rp 52,000.00 Rp 4,212.00
Tukang Batu OH 0.135 Rp 58,000.00 Rp 7,830.00
Kepala Tukang OH 0.0135 Rp 65,000.00 Rp 877.50
Mandor OH 0.0040 Rp 72,000.00 Rp 288.00
JUMLAH TENAGA KERJA Rp 13,207.50
B BAHAN
Pipa PVC 4" m' 1.200 Rp 168,000.00 Rp 201,600.00
Perlengkapan % 0.350 Rp 58,800.00 Rp 20,580.00
JUMLAH HARGA BAHAN Rp 222,180.00
C ALAT
D Jumlah ( A + B + C ) Rp 235,387.50
E Overhead dan Profit 15% Rp 35,308.13
F Harga Satuan Pekerjaan ( D + E ) Rp 270,695.63

Tugas Besar Rencana Anggaran dan Biaya 2017 124


ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : Pembanguan Rumah Tinggal


TAHUN ANGGARAN : 2017

Jenis Pekerjaan : Pekerjaan Pemasangan 1 m' Pipa PVC Tipe AW Diameter 3"
Satuan m'
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
Pekerja OH 0.081 Rp 52,000.00 Rp 4,212.00
Tukang Batu OH 0.135 Rp 58,000.00 Rp 7,830.00
Kepala Tukang OH 0.0135 Rp 65,000.00 Rp 877.50
Mandor OH 0.0040 Rp 72,000.00 Rp 288.00
JUMLAH TENAGA KERJA Rp 13,207.50
B BAHAN
Pipa PVC 3" m' 1.200 Rp 99,500.00 Rp 119,400.00
Perlengkapan % 0.350 Rp 34,825.00 Rp 12,188.75
JUMLAH HARGA BAHAN Rp 131,588.75
C ALAT
D Jumlah ( A + B + C ) Rp 144,796.25
E Overhead dan Profit 15% Rp 21,719.44
F Harga Satuan Pekerjaan ( D + E ) Rp 166,515.69

Jenis Pekerjaan : Pekerjaan Pemasangan 1 m' Pipa PVC Tipe AW Diameter 1"
Satuan m'
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
Pekerja OH 0.036 Rp 52,000.00 Rp 1,872.00
Tukang Batu OH 0.060 Rp 58,000.00 Rp 3,480.00
Kepala Tukang OH 0.0060 Rp 65,000.00 Rp 390.00
Mandor OH 0.0020 Rp 72,000.00 Rp 144.00
JUMLAH TENAGA KERJA Rp 5,886.00
B BAHAN
Pipa PVC 1" m' 1.200 Rp 90,000.00 Rp 108,000.00
Perlengkapan % 0.350 Rp 31,500.00 Rp 11,025.00
JUMLAH HARGA BAHAN Rp 119,025.00
C ALAT
D Jumlah ( A + B + C ) Rp 124,911.00
E Overhead dan Profit 15% Rp 18,736.65

Tugas Besar Rencana Anggaran dan Biaya 2017 125


ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : Pembanguan Rumah Tinggal


TAHUN ANGGARAN : 2017
F Harga Satuan Pekerjaan ( D + E ) Rp 143,647.65

Jenis Pekerjaan : Pekerjaan Pemasangan 1 Buah Floor Drain


Satuan : Buah
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
Pekerja OH 0.010 Rp 52,000.00 Rp 520.00
Tukang Batu OH 0.100 Rp 58,000.00 Rp 5,800.00
Kepala Tukang OH 0.0100 Rp 65,000.00 Rp 650.00
Mandor OH 0.0050 Rp 72,000.00 Rp 360.00
JUMLAH TENAGA KERJA Rp 7,330.00
B BAHAN
Floor Drain m' 1.000 Rp 20,000.00 Rp 20,000.00
JUMLAH HARGA BAHAN Rp 20,000.00
C ALAT
D Jumlah ( A + B + C ) Rp 27,330.00
E Overhead dan Profit 15% Rp 4,099.50
F Harga Satuan Pekerjaan ( D + E ) Rp 31,429.50

Jenis Pekerjaan : Pekerjaan Pemasangan 1 Buah Titik Lampu


Satuan : Buah
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
Upah OH 1.000 Rp 52,000.00 Rp 52,000.00
JUMLAH TENAGA KERJA Rp 52,000.00
B BAHAN

Tugas Besar Rencana Anggaran dan Biaya 2017 126


ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : Pembanguan Rumah Tinggal


TAHUN ANGGARAN : 2017
Pipa Listrik 5/8" btg 3.000 Rp 8,000.00 Rp 24,000.000
Kabel m 24.000 Rp 15,000.00 Rp 360,000.000
T Dus buah 3.000 Rp 6,000.00 Rp 18,000.000
L Bow buah 4.000 Rp 5,000.00 Rp 20,000.000
Las Dop buah 3.000 Rp 30,000.00 Rp 90,000.000
Klem buah 24.000 Rp 500.00 Rp 12,000.000
Mongkok buah 1.000 Rp 4,000.00 Rp 4,000.000
Saklar buah 1.000 Rp 22,500.00 Rp 22,500.000
Fitting buah 1.000 Rp 10,000.00 Rp 10,000.000
JUMLAH HARGA BAHAN Rp 560,500.00
C ALAT
D Jumlah ( A + B + C ) Rp 612,500.00
E Overhead dan Profit 15% Rp 91,875.00
F Harga Satuan Pekerjaan ( D + E ) Rp 704,375.00

Jenis Pekerjaan : Pekerjaan Pemasangan 1 MCB


Satuan : Buah
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
Upah OH 1.000 Rp 52,000.00 Rp 52,000.00
JUMLAH TENAGA KERJA Rp 52,000.00
B BAHAN
Pipa Listrik 5/8" btg 3.000 Rp 8,000.00 Rp 24,000.000
Kabel m 15.000 Rp 15,000.00 Rp 225,000.000
T Dus buah 1.000 Rp 6,000.00 Rp 6,000.000
L Bow buah 2.000 Rp 5,000.00 Rp 10,000.000
Klem buah 24.000 Rp 500.00 Rp 12,000.000
MCB buah 1.000 Rp 140,000.00 Rp 140,000.000
JUMLAH HARGA BAHAN Rp 417,000.00
C ALAT

Tugas Besar Rencana Anggaran dan Biaya 2017 127


ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : Pembanguan Rumah Tinggal


TAHUN ANGGARAN : 2017
D Jumlah ( A + B + C ) Rp 469,000.00
E Overhead dan Profit 15% Rp 70,350.00
F Harga Satuan Pekerjaan ( D + E ) Rp 539,350.00

Jenis Pekerjaan : Pekerjaan Pengecatan 1 m2 Tembok Baru ( 1 Lapis Plamuur, 1 Lapis Cat Dasar,
2 Lapis Cat Penutup )
Satuan : m2
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
Pekerja OH 0.020 Rp 52,000.00 Rp 1,040.00
Tukang Cat OH 0.063 Rp 58,000.00 Rp 3,654.00
Kepala Tukang OH 0.0063 Rp 65,000.00 Rp 409.50
Mandor OH 0.0030 Rp 72,000.00 Rp 216.00
JUMLAH TENAGA KERJA Rp 5,319.50
B BAHAN
Plamuur kg 0.100 Rp 10,000.00 Rp 1,000.00
Cat Dasar kg 0.100 Rp 50,000.00 Rp 5,000.00
Cat Penutup kg 0.260 Rp 50,000.00 Rp 13,000.00
JUMLAH HARGA BAHAN Rp 19,000.00
C ALAT
D Jumlah ( A + B + C ) Rp 24,319.50
E Overhead dan Profit 15% Rp 3,647.93
F Harga Satuan Pekerjaan ( D + E ) Rp 27,967.43

Jenis Pekerjaan : Pekerjaan Pengecatan 1 m2 Bidang Kayu Baru ( 1 Lapis Plamuur, 1 Lapis Cat
Dasar, 2 Lapis Cat Penutup )
Satuan : m2
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA

Tugas Besar Rencana Anggaran dan Biaya 2017 128


ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : Pembanguan Rumah Tinggal


TAHUN ANGGARAN : 2017
Pekerja OH 0.070 Rp 52,000.00 Rp 3,640.00
Tukang Cat OH 0.009 Rp 58,000.00 Rp 522.00
Kepala Tukang OH 0.0060 Rp 65,000.00 Rp 390.00
Mandor OH 0.0030 Rp 72,000.00 Rp 216.00
JUMLAH TENAGA KERJA Rp 4,768.00
B BAHAN
Cat Menie kg 0.200 Rp 40,000.00 Rp 8,000.00
Plamuur kg 0.150 Rp 25,000.00 Rp 3,750.00
Cat Dasar kg 0.170 Rp 60,000.00 Rp 10,200.00
Cat Penutup kg 0.260 Rp 60,000.00 Rp 15,600.00
Kuas buah 0.010 Rp 8,500.00 Rp 85.00
Pengencer kg 0.030 Rp 20,000.00 Rp 600.00
Ampelas lbr 0.200 Rp 5,500.00 Rp 1,100.00
JUMLAH HARGA BAHAN Rp 39,335.00
C ALAT
D Jumlah ( A + B + C ) Rp 44,103.00
E Overhead dan Profit 15% Rp 6,615.45
F Harga Satuan Pekerjaan ( D + E ) Rp 50,718.45

Jenis Pekerjaan : Pekerjaan Pengecatan 1 m2 Bidang Bidang Seng


Satuan : m2
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
Pekerja OH 0.020 Rp 52,000.00 Rp 1,040.00
Tukang Cat OH 0.200 Rp 58,000.00 Rp 11,600.00
Kepala Tukang OH 0.0200 Rp 65,000.00 Rp 1,300.00
Mandor OH 0.0025 Rp 72,000.00 Rp 180.00
JUMLAH TENAGA KERJA Rp 14,120.00
B BAHAN
Menie Besi kg 0.100 Rp 25,000.00 Rp 2,500.00
Kwas buah 0.010 Rp 8,500.00 Rp 85.00
JUMLAH HARGA BAHAN Rp 2,585.00
C ALAT
D Jumlah ( A + B + C ) Rp 16,705.00
E Overhead dan Profit 15% Rp 2,505.75
F Harga Satuan Pekerjaan ( D + E ) Rp 19,210.75

Tugas Besar Rencana Anggaran dan Biaya 2017 129


ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : Pembanguan Rumah Tinggal


TAHUN ANGGARAN : 2017

Jenis Pekerjaan : Pekerjaan Pelaburan 1 m2 Bidang Kayu Dengan Teac Oil


Satuan : m2
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
Pekerja OH 0.040 Rp 52,000.00 Rp 2,080.00
Tukang Cat OH 0.063 Rp 58,000.00 Rp 3,654.00
Kepala Tukang OH 0.0630 Rp 65,000.00 Rp 4,095.00
Mandor OH 0.0030 Rp 72,000.00 Rp 216.00
JUMLAH TENAGA KERJA Rp 10,045.00
B BAHAN
Teac Oil ltr 0.360 Rp 40,000.00 Rp 14,400.00
JUMLAH HARGA BAHAN Rp 14,400.00
C ALAT
D Jumlah ( A + B + C ) Rp 24,445.00
E Overhead dan Profit 15% Rp 3,666.75
F Harga Satuan Pekerjaan ( D + E ) Rp 28,111.75

Jenis Pekerjaan : Pekerjaan Pemasangan 1 buah Kunci Tanam Biasa


Satuan : buah
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
Pekerja OH 0.010 Rp 52,000.00 Rp 520.00
Tukang Kayu OH 0.500 Rp 58,000.00 Rp 29,000.00
Kepala Tukang OH 0.0500 Rp 65,000.00 Rp 3,250.00
Mandor OH 0.0050 Rp 72,000.00 Rp 360.00
JUMLAH TENAGA KERJA Rp 33,130.00
B BAHAN
Kunci Tanam Biasa buah 1.000 Rp 135,000.00 Rp 135,000.00
JUMLAH HARGA BAHAN Rp 135,000.00
C ALAT
D Jumlah ( A + B + C ) Rp 168,130.00
E Overhead dan Profit 15% Rp 25,219.50
F Harga Satuan Pekerjaan ( D + E ) Rp 193,349.50

Tugas Besar Rencana Anggaran dan Biaya 2017 130


ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : Pembanguan Rumah Tinggal


TAHUN ANGGARAN : 2017

Jenis Pekerjaan : Pekerjaan Pemasangan 1 buah Kunci Kamar Mandi


Satuan : buah
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
Pekerja OH 0.005 Rp 52,000.00 Rp 260.00
Tukang Kayu OH 0.500 Rp 58,000.00 Rp 29,000.00
Kepala Tukang OH 0.0500 Rp 65,000.00 Rp 3,250.00
Mandor OH 0.0030 Rp 72,000.00 Rp 216.00
JUMLAH TENAGA KERJA Rp 32,726.00
B BAHAN
Kunci Tanam KM buah 1.000 Rp 115,000.00 Rp 115,000.00
JUMLAH HARGA BAHAN Rp 115,000.00
C ALAT
D Jumlah ( A + B + C ) Rp 147,726.00
E Overhead dan Profit 15% Rp 22,158.90
F Harga Satuan Pekerjaan ( D + E ) Rp 169,884.90

Jenis Pekerjaan : Pekerjaan Pemasangan 1 Buah Grendel


Satuan : buah
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
Pekerja OH 0.005 Rp 52,000.00 Rp 260.00
Tukang Kayu OH 0.500 Rp 58,000.00 Rp 29,000.00
Kepala Tukang OH 0.0500 Rp 65,000.00 Rp 3,250.00
Mandor OH 0.0030 Rp 72,000.00 Rp 216.00

Tugas Besar Rencana Anggaran dan Biaya 2017 131


ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : Pembanguan Rumah Tinggal


TAHUN ANGGARAN : 2017
JUMLAH TENAGA KERJA Rp 32,726.00
B BAHAN
Grendel buah 1.000 Rp 9,000.00 Rp 9,000.00
JUMLAH HARGA BAHAN Rp 9,000.00
C ALAT
D Jumlah ( A + B + C ) Rp 41,726.00
E Overhead dan Profit 15% Rp 6,258.90
F Harga Satuan Pekerjaan ( D + E ) Rp 47,984.90

Jenis Pekerjaan : Pekerjaan Pemasangan 1 Buah Engsel Pintu Kayu


Satuan : buah
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
Pekerja OH 0.015 Rp 52,000.00 Rp 780.00
Tukang Kayu OH 0.150 Rp 58,000.00 Rp 8,700.00
Kepala Tukang OH 0.0150 Rp 65,000.00 Rp 975.00
Mandor OH 0.0008 Rp 72,000.00 Rp 57.60
JUMLAH TENAGA KERJA Rp 10,512.60
B BAHAN
Engsel Pintu Kayu buah 1.000 Rp 13,000.00 Rp 13,000.00
JUMLAH HARGA BAHAN Rp 13,000.00
C ALAT
D Jumlah ( A + B + C ) Rp 23,512.60
E Overhead dan Profit 15% Rp 3,526.89
F Harga Satuan Pekerjaan ( D + E ) Rp 27,039.49

Tugas Besar Rencana Anggaran dan Biaya 2017 132


ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : Pembanguan Rumah Tinggal


TAHUN ANGGARAN : 2017

Jenis Pekerjaan : Pekerjaan Pemasangan 1 Buah Engsel Pintu Alumunium


Satuan : buah
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
Pekerja OH 0.015 Rp 52,000.00 Rp 780.00
Tukang Kayu OH 0.150 Rp 58,000.00 Rp 8,700.00
Kepala Tukang OH 0.0150 Rp 65,000.00 Rp 975.00
Mandor OH 0.0008 Rp 72,000.00 Rp 57.60
JUMLAH TENAGA KERJA Rp 10,512.60
B BAHAN
Engsel Pintu Stainlessteel buah 1.000 Rp 14,500.00 Rp 14,500.00
JUMLAH HARGA BAHAN Rp 14,500.00
C ALAT
D Jumlah ( A + B + C ) Rp 25,012.60
E Overhead dan Profit 15% Rp 3,751.89
F Harga Satuan Pekerjaan ( D + E ) Rp 28,764.49

Jenis Pekerjaan : Pekerjaan Pemasangan 1 Buah Engsel Jendela Kupu - Kupu


Satuan : buah
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
Pekerja OH 0.010 Rp 52,000.00 Rp 520.00
Tukang Kayu OH 0.100 Rp 58,000.00 Rp 5,800.00

Tugas Besar Rencana Anggaran dan Biaya 2017 133


ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : Pembanguan Rumah Tinggal


TAHUN ANGGARAN : 2017
Kepala Tukang OH 0.0100 Rp 65,000.00 Rp 650.00
Mandor OH 0.0005 Rp 72,000.00 Rp 36.00
JUMLAH TENAGA KERJA Rp 7,006.00
B BAHAN
Engsel Jendela Kupu-Kupu buah 1.000 Rp 12,500.00 Rp 12,500.00
JUMLAH HARGA BAHAN Rp 12,500.00
C ALAT
D Jumlah ( A + B + C ) Rp 19,506.00
E Overhead dan Profit 15% Rp 2,925.90
F Harga Satuan Pekerjaan ( D + E ) Rp 22,431.90

Jenis Pekerjaan : Pekerjaan Pemasangan 1 Buah Kait Angin


Satuan : buah
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
Pekerja OH 0.015 Rp 52,000.00 Rp 780.00
Tukang Kayu OH 0.150 Rp 58,000.00 Rp 8,700.00
Kepala Tukang OH 0.0150 Rp 65,000.00 Rp 975.00
Mandor OH 0.0080 Rp 72,000.00 Rp 576.00
JUMLAH TENAGA KERJA Rp 11,031.00
B BAHAN
Kait Angin buah 1.000 Rp 15,000.00 Rp 15,000.00
JUMLAH HARGA BAHAN Rp 15,000.00
C ALAT
D Jumlah ( A + B + C ) Rp 26,031.00
E Overhead dan Profit 15% Rp 3,904.65
F Harga Satuan Pekerjaan ( D + E ) Rp 29,935.65

Tugas Besar Rencana Anggaran dan Biaya 2017 134


ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : Pembanguan Rumah Tinggal


TAHUN ANGGARAN : 2017

Jenis Pekerjaan : Pekerjaan Pemasangan 1 Buah Door Stop


Satuan : buah
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
Pekerja OH 0.010 Rp 52,000.00 Rp 520.00
Tukang Kayu OH 0.100 Rp 58,000.00 Rp 5,800.00
Kepala Tukang OH 0.0100 Rp 65,000.00 Rp 650.00
Mandor OH 0.0050 Rp 72,000.00 Rp 360.00
JUMLAH TENAGA KERJA Rp 7,330.00
B BAHAN
Door Stop buah 1.000 Rp 100,000.00 Rp 100,000.00
JUMLAH HARGA BAHAN Rp 100,000.00
C ALAT
D Jumlah ( A + B + C ) Rp 107,330.00
E Overhead dan Profit 15% Rp 16,099.50
F Harga Satuan Pekerjaan ( D + E ) Rp 123,429.50

Jenis Pekerjaan : Penggalian 1 m3 Tanah Biasa Untuk Septicktank dan Peresapan Sedalam 2 m
Satuan : m3
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
Pekerja OH 0.900 Rp 52,000.00 Rp 46,800.00
Mandor OH 0.045 Rp 72,000.00 Rp 3,240.00
JUMLAH TENAGA KERJA Rp 50,040.00
B BAHAN
C ALAT
D Jumlah ( A + B + C ) Rp 50,040.00
E Overhead dan Profit 15% Rp 7,506.00
F Harga Satuan Pekerjaan ( D + E ) Rp 57,546.00

Jenis Pekerjaan : Pegurungan Kembali 1 m3 Galian Tanah Septicktank dan Peresapan


Satuan : m3
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
Pekerja OH 0.500 Rp 52,000.00 Rp 26,000.00

Tugas Besar Rencana Anggaran dan Biaya 2017 135


ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : Pembanguan Rumah Tinggal


TAHUN ANGGARAN : 2017
Mandor OH 0.050 Rp 72,000.00 Rp 3,600.00
JUMLAH TENAGA KERJA Rp 29,600.00
B BAHAN
C ALAT
D Jumlah ( A + B + C ) Rp 29,600.00
E Overhead dan Profit 15% Rp 4,440.00
F Harga Satuan Pekerjaan ( D + E ) Rp 34,040.00

Jenis Pekerjaan : Pengurugan 1 m3 Dengan Pasir Urug ( Di Bawah Peresapan )


Satuan : m3
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
Pekerja OH 0.300 Rp 52,000.00 Rp 15,600.00
Mandor OH 0.010 Rp 72,000.00 Rp 720.00
JUMLAH TENAGA KERJA Rp 16,320.00
B BAHAN
Pasir Urug m3 1.200 Rp 150,000.00 Rp 180,000.00
JUMLAH HARGA BAHAN Rp 180,000.00
C ALAT
D Jumlah ( A + B + C ) Rp 196,320.00
E Overhead dan Profit 15% Rp 29,448.00
F Harga Satuan Pekerjaan ( D + E ) Rp 225,768.00

Jenis Pekerjaan : Pekerjaan Pemasangan 1 m3 Pasangan Batu Kosong ( Peresapan )


Satuan : m3
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
Pekerja OH 0.780 Rp 52,000.00 Rp 40,560.00
Tukang Batu OH 0.390 Rp 58,000.00 Rp 22,620.00
Kepala Tukang OH 0.039 Rp 65,000.00 Rp 2,535.00
Mandor OH 0.039 Rp 72,000.00 Rp 2,808.00
JUMLAH TENAGA KERJA Rp 68,523.00
B BAHAN

Tugas Besar Rencana Anggaran dan Biaya 2017 136


ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : Pembanguan Rumah Tinggal


TAHUN ANGGARAN : 2017
Batu Belah m3 1.200 Rp 120,000.00 Rp 144,000.00
Pasir Urug m3 0.432 Rp 150,000.00 Rp 64,800.00
JUMLAH HARGA BAHAN Rp 208,800.00
C ALAT
D Jumlah ( A + B + C ) Rp 277,323.00
E Overhead dan Profit 15% Rp 41,598.45
F Harga Satuan Pekerjaan ( D + E ) Rp 318,921.45

Jenis Pekerjaan : Pekerjaan Pemasangan 1 m3 Pasangan Batu Pecah ( Peresapan )


Satuan : m3
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
Pekerja OH 0.780 Rp 52,000.00 Rp 40,560.00
Tukang Batu OH 0.390 Rp 58,000.00 Rp 22,620.00
Kepala Tukang OH 0.039 Rp 65,000.00 Rp 2,535.00
Mandor OH 0.039 Rp 72,000.00 Rp 2,808.00
JUMLAH TENAGA KERJA Rp 68,523.00
B BAHAN
Batu Pecah m3 1.200 Rp 400,000.00 Rp 480,000.00
JUMLAH HARGA BAHAN Rp 480,000.00
C ALAT
D Jumlah ( A + B + C ) Rp 548,523.00
E Overhead dan Profit 15% Rp 82,278.45
F Harga Satuan Pekerjaan ( D + E ) Rp 630,801.45

Tugas Besar Rencana Anggaran dan Biaya 2017 137


ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : Pembanguan Rumah Tinggal


TAHUN ANGGARAN : 2017

Jenis Pekerjaan : Pekerjaan Pemasangan 1 m3 Kerikil ( Peresapan )


Satuan : m3
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
Pekerja OH 0.780 Rp 52,000.00 Rp 40,560.00
Tukang Batu OH 0.390 Rp 58,000.00 Rp 22,620.00
Kepala Tukang OH 0.039 Rp 65,000.00 Rp 2,535.00
Mandor OH 0.039 Rp 72,000.00 Rp 2,808.00
JUMLAH TENAGA KERJA Rp 68,523.00
B BAHAN
Kerikil m3 0.468 Rp 150,000.00 Rp 70,200.00
JUMLAH HARGA BAHAN Rp 70,200.00
C ALAT
D Jumlah ( A + B + C ) Rp 138,723.00
E Overhead dan Profit 15% Rp 20,808.45
F Harga Satuan Pekerjaan ( D + E ) Rp 159,531.45

Jenis Pekerjaan : Pekerjaan Pemasangan 1 m3 Kerikil ( Peresapan )


Satuan : m3
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
Pekerja OH 0.780 Rp 52,000.00 Rp 40,560.00
Tukang Batu OH 0.390 Rp 58,000.00 Rp 22,620.00
Kepala Tukang OH 0.039 Rp 65,000.00 Rp 2,535.00

Tugas Besar Rencana Anggaran dan Biaya 2017 138


ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : Pembanguan Rumah Tinggal


TAHUN ANGGARAN : 2017
Mandor OH 0.039 Rp 72,000.00 Rp 2,808.00
JUMLAH TENAGA KERJA Rp 68,523.00
B BAHAN
Kerikil m3 0.468 Rp 150,000.00 Rp 70,200.00
JUMLAH HARGA BAHAN Rp 70,200.00
C ALAT
D Jumlah ( A + B + C ) Rp 138,723.00
E Overhead dan Profit 15% Rp 20,808.45
F Harga Satuan Pekerjaan ( D + E ) Rp 159,531.45

Jenis Pekerjaan : Pekerjaan Pemasangan 1 m3 Batu Karang ( Peresapan )


Satuan : m3
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
Pekerja OH 0.780 Rp 52,000.00 Rp 40,560.00
Tukang Batu OH 0.390 Rp 58,000.00 Rp 22,620.00
Kepala Tukang OH 0.039 Rp 65,000.00 Rp 2,535.00
Mandor OH 0.039 Rp 72,000.00 Rp 2,808.00
JUMLAH TENAGA KERJA Rp 68,523.00
B BAHAN
Batu Karang m3 0.450 Rp 120,000.00 Rp 54,000.00
JUMLAH HARGA BAHAN Rp 54,000.00
C ALAT
D Jumlah ( A + B + C ) Rp 122,523.00
E Overhead dan Profit 15% Rp 18,378.45
F Harga Satuan Pekerjaan ( D + E ) Rp 140,901.45

Tugas Besar Rencana Anggaran dan Biaya 2017 139


ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : Pembanguan Rumah Tinggal


TAHUN ANGGARAN : 2017

Jenis Pekerjaan : Pekerjaan Pemasangan 1 m2 Rangka Besi Hollow 1x40.40.2mm, untuk Partisi
Satuan : m2
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
Pekerja OH 0.250 Rp 52,000.00 Rp 13,000.00
Tukang Besi OH 0.250 Rp 58,000.00 Rp 14,500.00
Kepala Tukang OH 0.025 Rp 65,000.00 Rp 1,625.00
Mandor OH 0.013 Rp 72,000.00 Rp 936.00
JUMLAH TENAGA KERJA Rp 30,061.00
B BAHAN
Rangka Besi Hollow 40.40 m' 3.500 Rp 15,000.00 Rp 52,500.00
Assesoris ( Perkuatan,las) Ls 1.000 Rp 52,500.00 Rp 52,500.00
JUMLAH HARGA BAHAN Rp 105,000.00
C ALAT
D Jumlah ( A + B + C ) Rp 135,061.00
E Overhead dan Profit 15% Rp 20,259.15
F Harga Satuan Pekerjaan ( D + E ) Rp 155,320.15

Jenis Pekerjaan : Pekerjaan Pemasangan 1 Buah Stop Kontak


Satuan : Buah
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
Tukang Listrik OH 1.000 Rp 58,000.00 Rp 58,000.00
JUMLAH TENAGA KERJA Rp 58,000.00
B BAHAN
Stop Kontak Buah 1.000 Rp 25,000.00 Rp 25,000.00
JUMLAH HARGA BAHAN Rp 25,000.00
C ALAT
D Jumlah ( A + B + C ) Rp 83,000.00
E Overhead dan Profit 15% Rp 12,450.00
F Harga Satuan Pekerjaan ( D + E ) Rp 95,450.00

Jenis Pekerjaan : Pekerjaan Pemasangan 1 Buah Saklar Tunggal


Satuan : Buah
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA

Tugas Besar Rencana Anggaran dan Biaya 2017 140


ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : Pembanguan Rumah Tinggal


TAHUN ANGGARAN : 2017
Tukang Listrik OH 0.160 Rp 58,000.00 Rp 9,280.00
JUMLAH TENAGA KERJA Rp 9,280.00
B BAHAN
Saklar Tunggal Buah 1.000 Rp 22,500.00 Rp 22,500.00
JUMLAH HARGA BAHAN Rp 22,500.00
C ALAT
D Jumlah ( A + B + C ) Rp 31,780.00
E Overhead dan Profit 15% Rp 4,767.00
F Harga Satuan Pekerjaan ( D + E ) Rp 36,547.00

Jenis Pekerjaan : Pekerjaan Pemasangan 1 Buah Saklar Ganda


Satuan : Buah
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
Tukang Listrik OH 0.160 Rp 58,000.00 Rp 9,280.00
JUMLAH TENAGA KERJA Rp 9,280.00
B BAHAN
Saklar Ganda Buah 1.000 Rp 25,000.00 Rp 25,000.00
JUMLAH HARGA BAHAN Rp 25,000.00
C ALAT
D Jumlah ( A + B + C ) Rp 34,280.00
E Overhead dan Profit 15% Rp 5,142.00
F Harga Satuan Pekerjaan ( D + E ) Rp 39,422.00

Tugas Besar Rencana Anggaran dan Biaya 2017 141


Jumlah Harga
( Rp. )

Rp 5,200.00
Rp 3,600.00
Rp 8,800.00

Rp 8,800.00
Rp 1,320.00
Rp 10,120.00

Jumlah Harga
( Rp. )

Rp 5,200.00
Rp 5,800.00
Rp 650.00
Rp 360.00
Rp 12,010.00

Rp 324,000.00
Rp 400.00
Rp 21,000.00
Rp 345,400.00

Rp 357,410.00
Rp 53,611.50
Rp 411,021.50

Jumlah Harga
( Rp. )

Tugas Besar Rencana Anggaran dan Biaya 2017 142


Rp 39,000.00
Rp 1,800.00
Rp 40,800.00

Rp 40,800.00
Rp 6,120.00
Rp 46,920.00

Jumlah Harga
( Rp. )

Rp 26,000.00
Rp 3,600.00
Rp 29,600.00

Rp 29,600.00
Rp 4,440.00
Rp 34,040.00

Jumlah Harga
( Rp. )

Rp 15,600.00
Rp 720.00
Rp 16,320.00

Rp 180,000.00
Rp 180,000.00

Rp 196,320.00
Rp 29,448.00
Rp 225,768.00

Tugas Besar Rencana Anggaran dan Biaya 2017 143


Jumlah Harga
( Rp. )

Rp 15,600.00
Rp 720.00
Rp 16,320.00

Rp 180,000.00
Rp 180,000.00

Rp 196,320.00
Rp 29,448.00
Rp 225,768.00

Jumlah Harga
( Rp. )

Rp 40,560.00
Rp 22,620.00
Rp 2,535.00
Rp 2,808.00
Rp 68,523.00

Rp 144,000.00
Rp 64,800.00
Rp 208,800.00

Rp 277,323.00
Rp 41,598.45
Rp 318,921.45

an 1 pc : 5 pp

Tugas Besar Rencana Anggaran dan Biaya 2017 144


Jumlah Harga
( Rp. )

Rp 40,560.00
Rp 22,620.00
Rp 2,535.00
Rp 2,808.00
Rp 68,523.00

Rp 144,000.00
Rp 64,800.00
Rp 208,800.00

Rp 277,323.00
Rp 41,598.45
Rp 318,921.45

x 12 ) cm tebal 1 Batu

Jumlah Harga
( Rp. )

Rp 31,200.00
Rp 11,600.00
Rp 1,300.00
Rp 2,160.00

Tugas Besar Rencana Anggaran dan Biaya 2017 145


Rp 46,260.00

Rp 140,000.00
Rp 39,540.00
Rp 19,337.50
Rp 198,877.50

Rp 245,137.50
Rp 36,770.63
Rp 281,908.13

x 12 ) cm tebal 1 Batu

Jumlah Harga
( Rp. )

Rp 31,200.00
Rp 11,600.00
Rp 1,300.00
Rp 2,160.00
Rp 46,260.00

Rp 140,000.00
Rp 26,640.00
Rp 21,675.00
Rp 188,315.00

Rp 234,575.00
Rp 35,186.25
Rp 269,761.25

Tugas Besar Rencana Anggaran dan Biaya 2017 146


Jumlah Harga
( Rp. )

Rp 13,520.00
Rp 11,600.00
Rp 1,300.00
Rp 936.00
Rp 27,356.00

Rp 12,441.60
Rp 6,587.50
Rp 19,029.10

Rp 46,385.10
Rp 6,957.77
Rp 53,342.87

Biasa )Tebal 20 mm

Jumlah Harga
( Rp. )

Rp 20,800.00
Rp 11,600.00
Rp 1,300.00
Rp 1,584.00
Rp 35,284.00

Rp 8,294.40
Rp 7,437.50
Rp 15,731.90

Rp 51,015.90
Rp 7,652.39
Rp 58,668.29

Tugas Besar Rencana Anggaran dan Biaya 2017 147


Tepi Luar )

Jumlah Harga
( Rp. )

Rp 20,800.00
Rp 11,600.00
Rp 1,300.00
Rp 1,584.00
Rp 35,284.00

Rp 9,984.00
Rp 6,800.00
Rp 16,784.00

Rp 52,068.00
Rp 7,810.20
Rp 59,878.20

Jumlah Harga
( Rp. )

Rp 10,400.00
Rp 5,800.00
Rp 650.00
Rp 720.00
Rp 17,570.00

Tugas Besar Rencana Anggaran dan Biaya 2017 148


Rp 3,900.00
Rp 3,900.00

Rp 21,470.00
Rp 3,220.50
Rp 24,690.50

Jumlah Harga
( Rp. )

Rp 293,800.00
Rp 15,950.00
Rp 90,480.00
Rp 81,200.00
Rp 20,995.00
Rp 20,376.00
Rp 522,801.00

Rp 540,000.00
Rp 40,000.00
Rp 1,800.00
Rp 2,310,000.00
Rp 75,000.00
Rp 403,200.00
Rp 114,750.00

Tugas Besar Rencana Anggaran dan Biaya 2017 149


Rp 121,500.00
Rp 3,606,250.00

Rp 4,129,051.00
Rp 619,357.65
Rp 4,748,408.65

Jumlah Harga
( Rp. )

Rp 275,600.00
Rp 15,950.00
Rp 75,400.00
Rp 87,000.00
Rp 17,225.00
Rp 19,080.00

Tugas Besar Rencana Anggaran dan Biaya 2017 150


Rp 490,255.00

Rp 360,000.00
Rp 640,000.00
Rp 64,000.00
Rp 4,800.00
Rp 1,732,500.00
Rp 56,250.00
Rp 403,200.00
Rp 114,750.00
Rp 121,500.00
Rp 12,800.00
Rp 280,000.00
Rp 3,789,800.00

Rp 4,280,055.00
Rp 642,008.25
Rp 4,922,063.25

Tugas Besar Rencana Anggaran dan Biaya 2017 151


Jumlah Harga
( Rp. )

Rp 330,200.00
Rp 15,950.00
Rp 95,700.00
Rp 81,200.00
Rp 21,645.00
Rp 22,896.00
Rp 567,591.00

Rp 640,000.00
Rp 64,000.00
Rp 4,800.00
Rp 2,310,000.00
Rp 75,000.00
Rp 403,200.00
Rp 114,750.00
Rp 121,500.00
Rp 378,000.00
Rp 280,000.00
Rp 64,000.00
Rp 4,455,250.00

Rp 5,022,841.00
Rp 753,426.15
Rp 5,776,267.15

Tugas Besar Rencana Anggaran dan Biaya 2017 152


Jumlah Harga
( Rp. )

Rp 275,600.00
Rp 15,950.00
Rp 75,400.00
Rp 60,900.00
Rp 17,225.00
Rp 19,080.00
Rp 464,155.00

Rp 640,000.00
Rp 324,000.00
Rp 64,000.00
Rp 4,800.00
Rp 1,732,500.00
Rp 56,250.00
Rp 403,200.00
Rp 114,750.00
Rp 121,500.00
Rp 280,000.00
Rp 128,000.00
Rp 3,869,000.00

Rp 4,333,155.00
Rp 649,973.25
Rp 4,983,128.25

la Kayu Kelas I

Tugas Besar Rencana Anggaran dan Biaya 2017 153


Jumlah Harga
( Rp. )

Rp 364,000.00
Rp 1,218,000.00
Rp 136,500.00
Rp 25,200.00
Rp 1,743,700.00

Rp 3,850,000.00
Rp 25,000.00
Rp 30,000.00
Rp 3,905,000.00

Rp 5,648,700.00
Rp 847,305.00
Rp 6,496,005.00

Jumlah Harga
( Rp. )

Rp 2,236.00

Rp 2,494.00

Rp 279.50
Rp 151.20
Rp 5,160.70

Rp 82,500.00
Rp 3,000.00
Rp 750.00
Rp 86,250.00

Rp 91,410.70
Rp 13,711.61
Rp 105,122.31

ood rangkap, Rangka

Tugas Besar Rencana Anggaran dan Biaya 2017 154


Jumlah Harga
( Rp. )

Rp 36,400.00
Rp 121,800.00
Rp 13,650.00
Rp 2,520.00
Rp 174,370.00

Rp 75,000.00
Rp 600.00
Rp 15,000.00

Rp 60,000.00

Rp 150,600.00

Rp 324,970.00
Rp 48,745.50
Rp 373,715.50

Jumlah Harga
( Rp. )

Rp 780.00
Rp 8,700.00
Rp 975.00
Rp 57.60
Rp 10,512.60

Tugas Besar Rencana Anggaran dan Biaya 2017 155


Rp 105,050.00
Rp 1,250.00
Rp 106,300.00

Rp 116,812.60
Rp 17,521.89
Rp 134,334.49

Jumlah Harga
( Rp. )

Rp 124,800.00
Rp 417,600.00
Rp 46,800.00
Rp 8,640.00
Rp 597,840.00

Rp 2,970,000.00
Rp 15,000.00
Rp 60,000.00
Rp 3,045,000.00

Rp 3,642,840.00
Rp 546,426.00
Rp 4,189,266.00

Tugas Besar Rencana Anggaran dan Biaya 2017 156


Jumlah Harga
( Rp. )

Rp 5,200.00
Rp 11,600.00
Rp 1,300.00
Rp 360.00
Rp 18,460.00

Rp 32,400.00
Rp 2,000.00
Rp 34,400.00

Rp 52,860.00
Rp 7,929.00
Rp 60,789.00

Jumlah Harga
( Rp. )

Rp 208,000.00
Rp 696,000.00
Rp 78,000.00
Rp 14,400.00
Rp 996,400.00

Rp 3,850,000.00
Rp 15,000.00
Rp 112,000.00
Rp 3,977,000.00

Rp 4,973,400.00
Rp 746,010.00
Rp 5,719,410.00

Tugas Besar Rencana Anggaran dan Biaya 2017 157


Jumlah Harga
( Rp. )

Rp 124,800.00
Rp 417,600.00
Rp 46,800.00
Rp 8,640.00
Rp 597,840.00

Rp 2,970,000.00
Rp 10,000.00
Rp 60,000.00
Rp 3,040,000.00

Rp 3,637,840.00
Rp 545,676.00
Rp 4,183,516.00

Jumlah Harga
( Rp. )

Rp 6,240.00
Rp 3,480.00
Rp 390.00
Rp 432.00
Rp 10,542.00

Rp 43,750.00

Tugas Besar Rencana Anggaran dan Biaya 2017 158


Rp 400.00
Rp 44,150.00

Rp 54,692.00
Rp 8,203.80
Rp 62,895.80

Jumlah Harga
( Rp. )

Rp 7,800.00
Rp 4,060.00
Rp 455.00
Rp 432.00
Rp 12,747.00

Rp 82,050.00
Rp 8,000.00
Rp 90,050.00

Rp 102,797.00
Rp 15,419.55
Rp 118,216.55

Jumlah Harga

Tugas Besar Rencana Anggaran dan Biaya 2017 159


( Rp. )

Rp 7,800.00
Rp 17,400.00
Rp 1,950.00
Rp 5,400.00
Rp 32,550.00

Rp 28,000.00
Rp 4,000.00
Rp 32,000.00

Rp 64,550.00
Rp 9,682.50
Rp 74,232.50

an ( 120 x 240 cm ),

Jumlah Harga
( Rp. )

Rp 5,200.00
Rp 5,800.00
Rp 650.00
Rp 3,600.00
Rp 15,250.00

Tugas Besar Rencana Anggaran dan Biaya 2017 160


Rp 22,500.00
Rp 600.00
Rp 23,100.00

Rp 38,350.00
Rp 5,752.50
Rp 44,102.50

Jumlah Harga
( Rp. )

Rp 2,600.00
Rp 2,900.00
Rp 325.00
Rp 216.00
Rp 6,041.00

Rp 13,125.00
Rp 200.00
Rp 13,325.00

Rp 19,366.00
Rp 2,904.90
Rp 22,270.90

Tugas Besar Rencana Anggaran dan Biaya 2017 161


Jumlah Harga
( Rp. )

Rp 36,400.00
Rp 20,300.00
Rp 2,275.00
Rp 2,520.00
Rp 61,495.00

Rp 82,800.00
Rp 12,000.00
Rp 9,562.50
Rp 2,250.00
Rp 106,612.50

Rp 168,107.50
Rp 25,216.13
Rp 193,323.63

Jumlah Harga
( Rp. )

Rp 36,400.00
Rp 20,300.00
Rp 2,275.00
Rp 2,520.00
Rp 61,495.00

Rp 57,750.00
Rp 12,000.00
Rp 9,562.50
Rp 2,250.00
Rp 81,562.50

Rp 143,057.50
Rp 21,458.63
Rp 164,516.13

Tugas Besar Rencana Anggaran dan Biaya 2017 162


an 30 cm x 30 cm

Jumlah Harga
( Rp. )

Rp 36,400.00
Rp 20,300.00
Rp 2,275.00
Rp 2,520.00
Rp 61,495.00

Rp 985,210.00
Rp 16,980.00
Rp 8,287.50
Rp 9,000.00
Rp 1,019,477.50

Rp 1,080,972.50
Rp 162,145.88
Rp 1,243,118.38

Jumlah Harga
( Rp. )

Rp 46,800.00
Rp 26,100.00
Rp 2,925.00
Rp 3,240.00
Rp 79,065.00

Rp 95,400.00
Rp 11,160.00

Tugas Besar Rencana Anggaran dan Biaya 2017 163


Rp 3,825.00
Rp 12,375.00
Rp 122,760.00

Rp 201,825.00
Rp 30,273.75
Rp 232,098.75

Jumlah Harga
( Rp. )

Rp 4,680.00
Rp 5,220.00
Rp 585.00
Rp 360.00
Rp 10,845.00

Rp 9,540.00
Rp 1,368.00
Rp 637.50
Rp 112.50
Rp 11,658.00

Rp 22,503.00
Rp 3,375.45
Rp 25,878.45

Jumlah Harga
( Rp. )

Tugas Besar Rencana Anggaran dan Biaya 2017 164


Rp 62,400.00
Rp 84,100.00
Rp 9,750.00
Rp 4,320.00
Rp 160,570.00

Rp 1,200,000.00
Rp 7,200.00
Rp 2,125.00
Rp 17,477.28
Rp 1,226,802.28

Rp 1,387,372.28
Rp 208,105.84
Rp 1,595,478.12

Jumlah Harga
( Rp. )

Rp 52,000.00
Rp 87,000.00
Rp 9,750.00
Rp 11,520.00
Rp 160,270.00

Rp 150,000.00
Rp 7,200.00
Rp 2,125.00
Rp 159,325.00

Tugas Besar Rencana Anggaran dan Biaya 2017 165


Rp 319,595.00
Rp 47,939.25
Rp 367,534.25

Jumlah Harga
( Rp. )

Rp 520.00
Rp 23,200.00
Rp 2,600.00
Rp 360.00
Rp 26,680.00

Rp 40,000.00
Rp 24,000.00
Rp 64,000.00

Rp 90,680.00
Rp 13,602.00
Rp 104,282.00

Jumlah Harga
( Rp. )

Tugas Besar Rencana Anggaran dan Biaya 2017 166


Rp 1,560.00
Rp 17,400.00
Rp 1,950.00
Rp 1,080.00
Rp 21,990.00

Rp 1,300,000.00
Rp 20,000.00
Rp 1,320,000.00

Rp 1,341,990.00
Rp 201,298.50
Rp 1,543,288.50

Jumlah Harga
( Rp. )

Rp 4,212.00
Rp 7,830.00
Rp 877.50
Rp 288.00
Rp 13,207.50

Rp 201,600.00
Rp 20,580.00
Rp 222,180.00

Rp 235,387.50
Rp 35,308.13
Rp 270,695.63

Tugas Besar Rencana Anggaran dan Biaya 2017 167


Jumlah Harga
( Rp. )

Rp 4,212.00
Rp 7,830.00
Rp 877.50
Rp 288.00
Rp 13,207.50

Rp 119,400.00
Rp 12,188.75
Rp 131,588.75

Rp 144,796.25
Rp 21,719.44
Rp 166,515.69

Jumlah Harga
( Rp. )

Rp 1,872.00
Rp 3,480.00
Rp 390.00
Rp 144.00
Rp 5,886.00

Rp 108,000.00
Rp 11,025.00
Rp 119,025.00

Rp 124,911.00
Rp 18,736.65

Tugas Besar Rencana Anggaran dan Biaya 2017 168


Rp 143,647.65

Jumlah Harga
( Rp. )

Rp 520.00
Rp 5,800.00
Rp 650.00
Rp 360.00
Rp 7,330.00

Rp 20,000.00
Rp 20,000.00

Rp 27,330.00
Rp 4,099.50
Rp 31,429.50

Jumlah Harga
( Rp. )

Rp 52,000.00
Rp 52,000.00

Tugas Besar Rencana Anggaran dan Biaya 2017 169


Rp 24,000.000
Rp 360,000.000
Rp 18,000.000
Rp 20,000.000
Rp 90,000.000
Rp 12,000.000
Rp 4,000.000
Rp 22,500.000
Rp 10,000.000
Rp 560,500.00

Rp 612,500.00
Rp 91,875.00
Rp 704,375.00

Jumlah Harga
( Rp. )

Rp 52,000.00
Rp 52,000.00

Rp 24,000.000
Rp 225,000.000
Rp 6,000.000
Rp 10,000.000
Rp 12,000.000
Rp 140,000.000
Rp 417,000.00

Tugas Besar Rencana Anggaran dan Biaya 2017 170


Rp 469,000.00
Rp 70,350.00
Rp 539,350.00

r, 1 Lapis Cat Dasar,

Jumlah Harga
( Rp. )

Rp 1,040.00
Rp 3,654.00
Rp 409.50
Rp 216.00
Rp 5,319.50

Rp 1,000.00
Rp 5,000.00
Rp 13,000.00
Rp 19,000.00

Rp 24,319.50
Rp 3,647.93
Rp 27,967.43

amuur, 1 Lapis Cat

Jumlah Harga
( Rp. )

Tugas Besar Rencana Anggaran dan Biaya 2017 171


Rp 3,640.00
Rp 522.00
Rp 390.00
Rp 216.00
Rp 4,768.00

Rp 8,000.00
Rp 3,750.00
Rp 10,200.00
Rp 15,600.00
Rp 85.00
Rp 600.00
Rp 1,100.00
Rp 39,335.00

Rp 44,103.00
Rp 6,615.45
Rp 50,718.45

Jumlah Harga
( Rp. )

Rp 1,040.00
Rp 11,600.00
Rp 1,300.00
Rp 180.00
Rp 14,120.00

Rp 2,500.00
Rp 85.00
Rp 2,585.00

Rp 16,705.00
Rp 2,505.75
Rp 19,210.75

Tugas Besar Rencana Anggaran dan Biaya 2017 172


Jumlah Harga
( Rp. )

Rp 2,080.00
Rp 3,654.00
Rp 4,095.00
Rp 216.00
Rp 10,045.00

Rp 14,400.00
Rp 14,400.00

Rp 24,445.00
Rp 3,666.75
Rp 28,111.75

Jumlah Harga
( Rp. )

Rp 520.00
Rp 29,000.00
Rp 3,250.00
Rp 360.00
Rp 33,130.00

Rp 135,000.00
Rp 135,000.00

Rp 168,130.00
Rp 25,219.50
Rp 193,349.50

Tugas Besar Rencana Anggaran dan Biaya 2017 173


Jumlah Harga
( Rp. )

Rp 260.00
Rp 29,000.00
Rp 3,250.00
Rp 216.00
Rp 32,726.00

Rp 115,000.00
Rp 115,000.00

Rp 147,726.00
Rp 22,158.90
Rp 169,884.90

Jumlah Harga
( Rp. )

Rp 260.00
Rp 29,000.00
Rp 3,250.00
Rp 216.00

Tugas Besar Rencana Anggaran dan Biaya 2017 174


Rp 32,726.00

Rp 9,000.00
Rp 9,000.00

Rp 41,726.00
Rp 6,258.90
Rp 47,984.90

Jumlah Harga
( Rp. )

Rp 780.00
Rp 8,700.00
Rp 975.00
Rp 57.60
Rp 10,512.60

Rp 13,000.00
Rp 13,000.00

Rp 23,512.60
Rp 3,526.89
Rp 27,039.49

Tugas Besar Rencana Anggaran dan Biaya 2017 175


Jumlah Harga
( Rp. )

Rp 780.00
Rp 8,700.00
Rp 975.00
Rp 57.60
Rp 10,512.60

Rp 14,500.00
Rp 14,500.00

Rp 25,012.60
Rp 3,751.89
Rp 28,764.49

Jumlah Harga
( Rp. )

Rp 520.00
Rp 5,800.00

Tugas Besar Rencana Anggaran dan Biaya 2017 176


Rp 650.00
Rp 36.00
Rp 7,006.00

Rp 12,500.00
Rp 12,500.00

Rp 19,506.00
Rp 2,925.90
Rp 22,431.90

Jumlah Harga
( Rp. )

Rp 780.00
Rp 8,700.00
Rp 975.00
Rp 576.00
Rp 11,031.00

Rp 15,000.00
Rp 15,000.00

Rp 26,031.00
Rp 3,904.65
Rp 29,935.65

Tugas Besar Rencana Anggaran dan Biaya 2017 177


Jumlah Harga
( Rp. )

Rp 520.00
Rp 5,800.00
Rp 650.00
Rp 360.00
Rp 7,330.00

Rp 100,000.00
Rp 100,000.00

Rp 107,330.00
Rp 16,099.50
Rp 123,429.50

apan Sedalam 2 m

Jumlah Harga
( Rp. )

Rp 46,800.00
Rp 3,240.00
Rp 50,040.00

Rp 50,040.00
Rp 7,506.00
Rp 57,546.00

Jumlah Harga
( Rp. )

Rp 26,000.00

Tugas Besar Rencana Anggaran dan Biaya 2017 178


Rp 3,600.00
Rp 29,600.00

Rp 29,600.00
Rp 4,440.00
Rp 34,040.00

Jumlah Harga
( Rp. )

Rp 15,600.00
Rp 720.00
Rp 16,320.00

Rp 180,000.00
Rp 180,000.00

Rp 196,320.00
Rp 29,448.00
Rp 225,768.00

Jumlah Harga
( Rp. )

Rp 40,560.00
Rp 22,620.00
Rp 2,535.00
Rp 2,808.00
Rp 68,523.00

Tugas Besar Rencana Anggaran dan Biaya 2017 179


Rp 144,000.00
Rp 64,800.00
Rp 208,800.00

Rp 277,323.00
Rp 41,598.45
Rp 318,921.45

Jumlah Harga
( Rp. )

Rp 40,560.00
Rp 22,620.00
Rp 2,535.00
Rp 2,808.00
Rp 68,523.00

Rp 480,000.00
Rp 480,000.00

Rp 548,523.00
Rp 82,278.45
Rp 630,801.45

Tugas Besar Rencana Anggaran dan Biaya 2017 180


Jumlah Harga
( Rp. )

Rp 40,560.00
Rp 22,620.00
Rp 2,535.00
Rp 2,808.00
Rp 68,523.00

Rp 70,200.00
Rp 70,200.00

Rp 138,723.00
Rp 20,808.45
Rp 159,531.45

Jumlah Harga
( Rp. )

Rp 40,560.00
Rp 22,620.00
Rp 2,535.00

Tugas Besar Rencana Anggaran dan Biaya 2017 181


Rp 2,808.00
Rp 68,523.00

Rp 70,200.00
Rp 70,200.00

Rp 138,723.00
Rp 20,808.45
Rp 159,531.45

Jumlah Harga
( Rp. )

Rp 40,560.00
Rp 22,620.00
Rp 2,535.00
Rp 2,808.00
Rp 68,523.00

Rp 54,000.00
Rp 54,000.00

Rp 122,523.00
Rp 18,378.45
Rp 140,901.45

Tugas Besar Rencana Anggaran dan Biaya 2017 182


2mm, untuk Partisi

Jumlah Harga
( Rp. )

Rp 13,000.00
Rp 14,500.00
Rp 1,625.00
Rp 936.00
Rp 30,061.00

Rp 52,500.00
Rp 52,500.00
Rp 105,000.00

Rp 135,061.00
Rp 20,259.15
Rp 155,320.15

Jumlah Harga
( Rp. )

Rp 58,000.00
Rp 58,000.00

Rp 25,000.00
Rp 25,000.00

Rp 83,000.00
Rp 12,450.00
Rp 95,450.00

Jumlah Harga
( Rp. )

Tugas Besar Rencana Anggaran dan Biaya 2017 183


Rp 9,280.00
Rp 9,280.00

Rp 22,500.00
Rp 22,500.00

Rp 31,780.00
Rp 4,767.00
Rp 36,547.00

Jumlah Harga
( Rp. )

Rp 9,280.00
Rp 9,280.00

Rp 25,000.00
Rp 25,000.00

Rp 34,280.00
Rp 5,142.00
Rp 39,422.00

Tugas Besar Rencana Anggaran dan Biaya 2017 184


DAFTAR HARGA SATUAN UPAH DAN BAHAN

PEKERJAAN : Pembangunan Rumah Tinggal


TAHUN ANGGARAN : 2017

A. HARGA SATUAN UPAH KERJA


HARGA
No TENAGA KERJA SATUAN SATUAN
( Rp)
1 Mandor Org/Hari Rp 72,000.00
2 Kepala tukang Org/Hari Rp 65,000.00
3 Tukang batu Org/Hari Rp 58,000.00
4 Tukang besi Org/Hari Rp 58,000.00
5 Tukang cat Org/Hari Rp 58,000.00
6 Tukang kayu Org/Hari Rp 58,000.00
7 Tukang listrik Org/Hari Rp 58,000.00
8 Pekerja Org/Hari Rp 52,000.00

B. HARGA SATUAN BAHAN


HARGA
No Bahan SATUAN SATUAN
( Rp )
1 Ampelas Lbr Rp 5,500.00
2 Batu Bata Kecil 5 x 11 x 22 Buah Rp 1,000.00
3 Batu Karang/Belah m3 Rp 120,000.00
4 Batu Kerikil Kali Bulat 1/3 & 2/3 m3 Rp 150,000.00
5 Batu Pecah 1/2 & 2/3 m3
Rp 400,000.00
6 Besi Beton Polos/Ulir Kg Rp 11,000.00
7 Besi Beugel/Plat Strip/Angkur Baut Kg Rp 15,000.00
8 Besi Hollow 40x40 mm m Rp 15,000.00
9 Cat Menie/Kayu ( Altex ) Kg Rp 40,000.00
10 Cat Kayu/Besi Kilap ( Avian ) Kg Rp 60,000.00
11 Cat Tembok/Plafon ( Matex ) Kg Rp 50,000.00
12 Door Stop Buah Rp 100,000.00
13 Closet Jongkok Ex INS Unit Rp 150,000.00
14 Engsel Jendela Kupu - Kupu Buah Rp 12,500.00
15 Engsel Pintu Tempel Buah Rp 13,000.00
16 Engsel Pintu Stainless Steel Buah Rp 14,500.00
17 Floor Drain Buah Rp 20,000.00
18 Grendel Jendela Buah Rp 9,000.00
19 Kait Angin Buah Rp 15,000.00
20 Kayu Balok Kelas I ( Jati ) m3 Rp 3,500,000.00
21 Kayu Dolken Bulat Btg Rp 4,000.00
22 Kayu Balok Kelas II m3 Rp 2,700,000.00
23 Kayu Papan Kelas II ( Meranti ) m 3
Rp 3,000,000.00
24 Kayu Usuk Kelas II ( Meranti ) m3 Rp 2,700,000.00
25 Kayu Usuk/Papan Bekisting Kelas III (Lokal) m3 Rp 2,000,000.00
26 Kran Air Stainlessteel 1/2" Buah Rp 40,000.00
27 Kuas Cat 4" Buah Rp 8,500.00
28 Kunci Pintu Double Slaag Buah Rp 135,000.00
29 Kunci Pintu KM/WC Buah Rp 115,000.00
30 Kusen Alumunium Alexindo m' Rp 75,000.00
31 Kaca Polos( 5 mm ) m2 Rp 95,500.00
32 Kawat Ikat Beton Kg Rp 25,000.00
33 Klem Buah Rp 500.00
34 L Bow Buah Rp 5,000.00
35 Las Dop Buah Rp 30,000.00
36 Lenka Fitting Lampu Rossi Buah Rp 10,000.00
37 Lem Aica Aibon ( Sealent ) Kg Rp 25,000.00
38 Lem Kaca ( Sealent ) Tube Rp 12,500.00
39 Lem Wiber Kg Rp 30,000.00
40 List Kayu Profil m' Rp 12,500.00
41 MCB Buah Rp 140,000.00
42 Minyak Cat/Tiner Ltr Rp 20,000.00
43 Minyak Bekisting Ltr Rp 3,000.00
44 Mongkok Listrik Buah Rp 4,000.00
45 Paku Kg Rp 20,000.00
46 Pasir Beton m3 Rp 212,500.00
47 Pasir Pasang m3 Rp 212,500.00
48 Pasir Urug m3
Rp 150,000.00
49 Pipa Listrik 5/8" Btg Rp 8,000.00
50 Pipa PVC Tipe AW ᴓ4" m' Rp 168,000.00
51 Pipa PVC Tipe AW ᴓ3" m' Rp 99,500.00
52 Pipa PVC Tipe AW ᴓ1" m' Rp 90,000.00
53 Plamuur Kayu/Dempul Kg Rp 25,000.00
54 Plamuur Tembok Kg Rp 10,000.00
55 Plint Keramik Buah Rp 1,800.00
56 Plywood 9 mm Lbr Rp 100,000.00
57 Politur/Teac Oil Ltr Rp 40,000.00
58 Porselin Buah Rp 1,800.00
59 Pasangan Wastafel Keramik Lengkap Unit Rp 1,000,000.00
60 Saklar Tunggal Buah Rp 22,500.00
61 Saklar Ganda Buah Rp 25,000.00
62 Seal Tape Onda Buah Rp 4,000.00
63 Semen Portland ( PC ) Kg Rp 1,200.00
64 Semen Warna Kg Rp 4,500.00
65 Seng Gelombang BJLS 0.3 Lbr Rp 62,500.00
66 Seng Pelat BJLS 0.3 Lbr Rp 273,500.00
67 Stop Kontak Buah Rp 25,000.00
68 T Dus Buah Rp 6,000.00
69 Tegel Keramik 30/30 Polos Dos Rp 55,000.00
70 Tegel Keramik 30/30 Mozaik Dos Rp 83,000.00
71 Tegel Keramik 60/60 Polos Dos Rp 90,000.00
72 Tripleks Tebal 4 mm Lbr Rp 60,000.00
73 Wastafel Cuci Piring IKEA ( 1 Bak Cuci + Pengering ) Unit Rp 1,300,000.00
DAFTAR HARGA SATUAN UPAH DAN BAHAN

PEKERJAAN : Pembangunan Rumah Tinggal


TAHUN ANGGARAN : 2017

A. HARGA SATUAN UPAH KERJA


HARGA
No TENAGA KERJA SATUAN SATUAN
( Rp)
1 Mandor Org/Hari Rp 72,000.00
2 Kepala tukang Org/Hari Rp 65,000.00
3 Tukang batu Org/Hari Rp 58,000.00
4 Tukang besi Org/Hari Rp 58,000.00
5 Tukang cat Org/Hari Rp 58,000.00
6 Tukang kayu Org/Hari Rp 58,000.00
7 Tukang listirk Org/Hari Rp 58,000.00
8 Pekerja Org/Hari Rp 52,000.00

B. HARGA SATUAN BAHAN


HARGA
No TENAGA KERJA SATUAN SATUAN
( Rp)
Ampelas Lbr Rp 5,500.00
Batu Bata Kecil 5 x 11 x 22 m3 Rp 1,000.00
Batu Karang/Belah m3 Rp 120,000.00
Batu Kerikil Kali Bulat 1/3 & 2/3 m3 Rp 150,000.00
Batu Pecah 1/2 & 2/3 m3 Rp 400,000.00
Besi Beton Polos/Ulir Kg Rp 11,000.00
Besi Beugel/Plat Strip/Angkur Baut Kg Rp 15,000.00
Besi Hollow 40x40 mm m' Rp 15,000.00
Besi Hollow 2x2 cm Kg Rp 25,000.00
Cat Menie/Kayu ( Altex ) Kg Rp 40,000.00
Cat Kayu/Besi Kilap ( Avian ) Kg Rp 60,000.00
Cat Tembok/Plafon ( Matex ) Kg Rp 50,000.00
Door Stop Buah Rp 100,000.00
Closet Jongkok Ex INS + Ongkos Pasang Unit Rp 150,000.00
Engsel Jendela Kupu - Kupu Buah Rp 12,500.00
Egsel Pintu Tempel Buah Rp 13,000.00
Egsel Pintu Stainless Steel Buah Rp 14,500.00
Floor Drain Buah Rp 20,000.00
Grendel Jendela + Ongkos Pasang Buah Rp 9,000.00
Kait Angin Buah Rp 15,000.00
Kayu Balok Kelas I ( Jati ) m3 Rp 3,500,000.00

Tugas Besar Rencana Anggaran dan Biaya 2017 188


DAFTAR HARGA SATUAN UPAH DAN BAHAN

Kayu Dolken Bulat Btg Rp 4,000.00


Kayu Balok Kelas II m3 Rp 2,700,000.00
Kayu Papan Kelas II ( Meranti ) m3 Rp 3,000,000.00
Kayu Usuk Kelas II ( Meranti ) m3 Rp 2,700,000.00
Kayu Usuk/Papan Bekisting Kelas III (Lokal) m3
Rp 2,000,000.00
Kran Air Stainlessteel 1/2" Unit Rp 40,000.00
Kawat Las Listrik Kg Rp 20,000.00
Kuas Cat 4" Buah Rp 8,500.00
Kunci Pintu Double Slaag Buah Rp 135,000.00
Kunci Pintu KM/WC + Ongkos Pasang Buah Rp 115,000.00
Kusen Alumunium Alexindo m' Rp 75,000.00
Kabel NYM 2.5 mm 3 Urat m' Rp 15,000.00
Kaca Polos( 5 mm ) m2 Rp 95,500.00
Kawat Ikat Beton Kg Rp 25,000.00
Klem Buah Rp 500.00
L Bow Buah Rp 5,000.00
Las Dop Buah Rp 30,000.00
Lenka Fitting Lampu Rossi Buah Rp 10,000.00
Lem Aica Aibon ( Sealent ) Kg Rp 25,000.00
Lem Kaca ( Sealent ) Tube Rp 12,500.00
Lem Wiber Kg Rp 30,000.00
List Kayu Profil m' Rp 12,500.00
MCB Buah Rp 140,000.00
Minyak Cat/Tine Ltr Rp 20,000.00
Minyak Bekisting Ltr Rp 3,000.00
Mongkok Listrik Buah Rp 4,000.00
Minyak Solar/Diesel Ltr Rp 4,500.00
Minyak Pelumas Oli Ltr Rp 30,000.00
Paku Biasa Kg Rp 20,000.00
Paku 1 - 2.5 cm Kg Rp 20,000.00
Paku 5 - 12 cm Kg Rp 20,000.00
Paku/Sekrup Abses Buah Rp 1,500.00
Pasir Beton m3 Rp 212,500.00
Pasir Pasang m3 Rp 212,500.00
Pasir Urug m3 Rp 150,000.00
Pengelasan cm Rp 1,300.00
Pipa Listrik 5/8" Btg Rp 8,000.00
Pipa PVC Tipe AW ᴓ4" m' Rp 168,000.00
Pipa PVC Tipe AW ᴓ3" m' Rp 99,500.00
Pipa PVC Tipe AW ᴓ1" m' Rp 90,000.00
Plamuur Kayu/Dempul Kg Rp 25,000.00
Plamuur Tembok Kg Rp 10,000.00

Tugas Besar Rencana Anggaran dan Biaya 2017 189


DAFTAR HARGA SATUAN UPAH DAN BAHAN

Plint Keramik Buah Rp 1,800.00


Plywood 4 mm Lbr Rp 100,000.00
Politur/Teac Oil Ltr Rp 40,000.00
Porselin Buah Rp 1,800.00
Pasangan Wastafel Keramik Lengkap Unit Rp 1,000,000.00
Saklar Tunggal Buah Rp 22,500.00
Saklar Ganda Buah Rp 25,000.00
Seal Tape Onda Buah Rp 4,000.00
Semen Portland ( PC ) Kg Rp 1,200.00
Semen Warna Kg Rp 4,500.00
Semen Portland ( PC ) @40 Kg Zak Rp 48,000.00
Seng Gelombang BJLS 0.3 Lbr Rp 62,500.00
Seng Pelat BJLS 0.3 Lbr Rp 273,500.00
Sewa Mesin Las Jam Rp 60,000.00
Stop Kontak Buah Rp 25,000.00
T Dus Buah Rp 6,000.00
Tegel Keramik 30/30 Polos Dos Rp 55,000.00
Tegel Keramik 30/30 Mozaik Dos Rp 83,000.00
Tegel Keramik 60/60 Polos Dos Rp 90,000.00
Tripleks Tebal 4 mm 1.2 x 0.6 m Lbr Rp 60,000.00
Wastafel Cuci Piring IKEA ( 1 Bak Cuci + Pengering ) Unit Rp 1,300,000.00

Tugas Besar Rencana Anggaran dan Biaya 2017 190


Tugas Besar Rencana Anggaran dan Biaya 2017 191
Rencana Anggaran Dan Biaya
PEKERJAAN : Pembangunan Rumah Tinggal
TAHUN ANGGARAN : 2017
No Uraian Pekerjaan Volume Satuan Harga Satuan
a b c d e
I Pekerjaan Persiapan
1 Pembersihan Lahan 84.000 m2 Rp 10,120.00
2 Pemasangan Bouwplank 45.000 m' Rp 411,021.50
3 Penyediaan Air Bersih 1.000 LS Rp 1,000,000.00
Sub Total
II Pekerjaan Tanah dan Urugan
1 Pek. Galian Tanah Pondasi 86.670 m3 Rp 46,920.00
2 Pek. Urugan Tanah Kembali 28.890 m3 Rp 34,040.00
3 Pek. Urugan Tanah Peninggi Lantai 88.120 m3 Rp 34,040.00
4 Pek. Urugan Pasir Bawah Pondasi 0.000 m 3
Rp 225,768.00
5 Pek. Urugan Pasir Bawah Lantai 11.806 m3 Rp 225,768.00
Sub Total
III Pekerjaan Pasangan dan Plesteran
1 Pas. Aanstamping Batu Karang/Kali 35.845 m3 Rp 318,921.45
2 Pas. Pondasi Karang/Kali ( 1pc : 5psr ) 39.323 m 3
Rp 318,921.45
3 Pas. Tembok Trasram ( 1pc : 3psr ) 178.662 m2 Rp 281,908.13
4 Pas. Tembok Biasa ( 1pc : 5 psr ) 436.360 m2 Rp 269,761.25
5 Plesteran Tembok Trasram ( 1pc : 3psr ) 357.324 m 2
Rp 53,342.87
6 Plesteran Tembok Biasa ( 1pc : 5 psr ) 828.634 m2 Rp 58,668.29
7 Plesteran Pondasi Tepi Luar ( 1pc : 4psr ) 0.000 m2 Rp 59,878.20
8 Acian Tembok 1657.267 m 2
Rp 24,690.50
Sub Total
IV Pekerjaan Beton
1 Cor Beton Slof ( 1 pc : 3 psr : 5 kr ) 0.000 m3 Rp 4,748,408.65
2 Cor Beton Kolom ( 1 pc : 3 psr : 5 kr ) 5.923 m3 Rp 4,922,063.25
3 Cor Beton Ringbalk ( 1 pc : 3 psr : 5 kr ) 2.790 m 3
Rp 5,776,267.15
4 Cor Beton Latei ( 1 pc : 3 psr : 5 kr ) 0.303 m3 Rp 5,776,267.15
5 Cor Plat Beton ( 1 pc : 3 psr : 5 kr ) 3.150 m3 Rp 4,983,128.25
6 Cor Meja Beton ( 1 pc : 3 psr : 5 kr ) 0.535 m 3
Rp 4,983,128.25
7 Cor Bak Beton ( 1 pc : 3 psr : 5 kr ) 0.435 m3 Rp 4,983,128.25
8 Carport ( 1 pc : 3 psr : 5 kr ) 0.000 m3 Rp 4,983,128.25
Sub Total
V Pekerjaan Kayu dan Kaca
1 Pas. Kayu Kusen Kelas I 0.217 m2 Rp 6,496,005.00
2 Pas. Kusen Alumunium 0.036 m' Rp 105,122.31

Tugas Besar Rencana Anggaran dan Biaya 2017 192


No Uraian Pekerjaan Volume Satuan Harga Satuan
a b c d e
3 Pas. Daun Pintu dan Jendela 24.000 m2 Rp 373,715.50
4 Pas. Kaca Pada Pintu dan Jendela 0.539 m2 Rp 134,334.49
5 Pas. Kayu Gording 8/10 1.734 m3 Rp 4,189,266.00
6 Pas. Kayu Listplank 3 x 20 170.833 m' Rp 60,789.00
7 Pas. Kayu Kuda - Kuda -0.828 m3 Rp 5,719,410.00
Sub Total
VI Pekerjaan Penutup Atap dan Plafon
1 Pas. Atap Seng Gelombang BJLS 0.3 13.173 m3 Rp 62,895.80
2 Pas. Atap Bubungan Seng Licin 3.880 m' Rp 118,216.55
3 Pas. Rangka Plafon 131.100 m2 Rp 74,232.50
4 Pas. Langit - Langit Tripleks 131.100 m2 Rp 44,102.50
5 Pas. List Plafon 138.500 m' Rp 22,270.90
Sub Total
VII Pekerjaan Lantai
1 Pas. Lantai Keramik 60x60 89.000 m2 Rp 193,323.63
2 Pas. Lantai Keramik 30x30 5.250 m 2
Rp 164,516.13
3 Pas. Keramik Mozaik 30x30 3.000 m2 Rp 1,243,118.38
4 Pas. Keramik Dinding Porselin 10x20 264.740 m2 Rp 232,098.75
5 Pas. Keramik Plint 10x20 56.660 m' Rp 25,878.45
Sub Total
VIII Pekerjaan Instalasi Listrik dan Air
1 Pas. Saklar Tungal 9.000 Buah Rp 36,547.00
2 Pas. Saklar Seri 3.000 Buah Rp 39,422.00
3 Pas. Stop Kontak 9.000 Buah Rp 95,450.00
4 Pas. Lampu Hias 4.000 Buah Rp 704,375.00
5 Pas. Lampu Ruangan 6.000 Buah Rp 704,375.00
6 Pas. Lampu KM/WC 1.000 Buah Rp 704,375.00
7 Pas. Lampu Pijar 2.000 Buah Rp 704,375.00
8 Pas. Lampu Tidur 4.000 Buah Rp 704,375.00
9 Pas. Panel Pembagi ( M C B ) 1.000 Buah Rp 539,350.00
10 Pas. Wastafel 1.000 Buah Rp 1,595,478.12
11 Pas. Closet Jongkok 1.000 Buah Rp 367,534.25
12 Pas. Kran Air 3.000 Buah Rp 104,282.00
13 Pas. Kitchen Zink 1.000 Buah Rp 1,543,288.50
14 Pipa PVC, ∅4" 1.000 m' Rp 270,695.63
15 Pipa PVC, ∅3" 1.000 m' Rp 166,515.69
16 Pipa PVC, ∅1" 1.000 m' Rp 143,647.65
17 Pipa Hawa, ∅1" 1.000 m' Rp 143,647.65
18 Pas. Floor Drain 1.000 Buah Rp 31,429.50
19 Pas. Kabel Listrik 43.650 m Rp 15,000.00
Sub Total
IX Pekerjaan Finishing

Tugas Besar Rencana Anggaran dan Biaya 2017 193


No Uraian Pekerjaan Volume Satuan Harga Satuan
a b c d e
1 Cat Tembok 1657.267 m2 Rp 27,967.43
2 Cat Plafon 131.100 m2 Rp 27,967.43
3 Cat Kayu 1858.177 m2 Rp 50,718.45
4 List Plafon 4.155 m 2
Rp 50,718.45
5 Teac Oil 48.000 m2 Rp 28,111.75
6 Cat Seng 35.884 m2 Rp 19,210.75
Sub Total
X Pekerjaan Penggantung dan Pengunci
1 Pas. Kunci Double Slaag 7.000 Buah Rp 193,349.50
2 Pas. Kunci KM/WC 1.000 Buah Rp 169,884.90
3 Pas. Grendel 16.000 Buah Rp 47,984.90
4 Pas. Engsel Pintu Kayu 21.000 Buah Rp 27,039.49
5 Pas. Engsel Pintu Alumunium 2.000 Buah Rp 28,764.49
6 Pas. Engsel Jendela 32.000 Buah Rp 22,431.90
7 Pas. Kait Angin 32.000 Buah Rp 29,935.65
8 Pas. Door Stopper 1.000 Buah Rp 123,429.50
9 Pas. Mur , Baut dan Beugel 1.000 Ls Rp 100,000.00
Sub Total
XI Pekerjaan Septicktank dan Resapan
1 Galian Septicktank dan Resapan 7.000 m3 Rp 57,546.00
2 Urugan Tanah Kembali 2.333 m3 Rp 34,040.00
3 Urugan Pasir Bidang Resapan 0.053 m3 Rp 225,768.00
4 Pas. Batu Kosong Bidang Resapan 0.420 m3 Rp 318,921.45
5 Pas. Batu Pecah Bidang Resapan 0.420 m 3
Rp 630,801.45
6 Pas. Kerikil Bidang Resapan 0.315 m3 Rp 159,531.45
7 Pas. Batu Karang Bidang Resapan 0.524 m3 Rp 140,901.45
8 Cor Rabat Beton 0.468 m 3
Rp 4,983,128.25
9 Cor Plat Beton Septicktank 0.400 m3 Rp 4,983,128.25
10 Cor Plat Beton Resapan 0.300 m3 Rp 4,983,128.25
11 Cor Kolom Praktis 0.529 m 3
Rp 4,922,063.25
12 Pek. Pasangan Tembok Biasa ( Resapan ) 8.000 m2 Rp 269,761.25
13 Pek. Plesteran Tembok Biasa ( Resapan ) 16.000 m2 Rp 58,668.29
14 Pek. Pasangan Tembok Trasram ( ST ) 9.600 m 2
Rp 281,908.13
15 Pek. Plesteran Tembok Trasram ( ST ) 19.200 m2 Rp 58,668.29
Sub Total
XII Pekerjaan Besi
1 Pemasangan Gerbang Partisi Besi Hollow 7.3775 m2 Rp 155,320.15
` Sub Total
XIII Pekerjaan Lain - Lain
1 Pembersihan Kembali 1.000 Ls Rp 1,000,000.00

Tugas Besar Rencana Anggaran dan Biaya 2017 194


No Uraian Pekerjaan Volume Satuan Harga Satuan
a b c d e
Sub Total
Jumlah
PPN 10 %
Total Jumlah

Tugas Besar Rencana Anggaran dan Biaya 2017 195


Jumlah Harga
c+e

Rp 850,080.00
Rp 18,495,967.50
Rp 1,000,000.00
Rp 20,346,047.50

Rp 4,066,556.40
Rp 983,415.60
Rp 2,999,604.80
Rp -
Rp 2,665,473.45
Rp 10,715,050.25

Rp 11,431,739.38
Rp 12,540,788.72
Rp 50,366,269.43
Rp 117,713,046.03
Rp 19,060,685.89
Rp 48,614,518.07
Rp -
Rp 40,918,760.74
Rp 300,645,808.25

Rp -
Rp 29,150,919.60
Rp 16,115,785.35
Rp 1,751,941.83
Rp 15,696,853.99
Rp 2,665,973.61
Rp 2,167,660.79
Rp -
Rp 67,549,135.16

Rp 1,410,620.48
Rp 3,799.54

Tugas Besar Rencana Anggaran dan Biaya 2017 196


Jumlah Harga
c+e
Rp 8,969,172.00
Rp 72,472.92
Rp 7,262,511.54
Rp 10,384,787.50
-Rp 4,738,462.55
Rp 23,364,901.42

Rp 828,545.24
Rp 458,680.21
Rp 9,731,880.75
Rp 5,781,837.75
Rp 3,084,519.65
Rp 19,885,463.61

Rp 17,205,802.63
Rp 863,709.66
Rp 3,729,355.13
Rp 61,445,823.08
Rp 1,466,272.98
Rp 84,710,963.46

Rp 328,923.00
Rp 118,266.00
Rp 859,050.00
Rp 2,817,500.00
Rp 4,226,250.00
Rp 704,375.00
Rp 1,408,750.00
Rp 2,817,500.00
Rp 539,350.00
Rp 1,595,478.12
Rp 367,534.25
Rp 312,846.00
Rp 1,543,288.50
Rp 270,695.63
Rp 166,515.69
Rp 143,647.65
Rp 143,647.65
Rp 31,429.50
Rp 654,750.00
Rp 19,049,796.98

Tugas Besar Rencana Anggaran dan Biaya 2017 197


Jumlah Harga
c+e
Rp 46,349,501.71
Rp 3,666,529.42
Rp 94,243,850.50
Rp 210,735.16
Rp 1,349,364.00
Rp 689,354.71
Rp 146,509,335.51

Rp 1,353,446.50
Rp 169,884.90
Rp 767,758.40
Rp 567,829.29
Rp 57,528.98
Rp 717,820.80
Rp 957,940.80
Rp 123,429.50
Rp 100,000.00
Rp 4,815,639.17

Rp 402,822.00
Rp 79,426.67
Rp 11,852.82
Rp 133,947.01
Rp 264,936.61
Rp 50,252.41
Rp 73,888.72
Rp 2,329,612.46
Rp 1,993,251.30
Rp 1,494,938.48
Rp 2,604,755.87
Rp 2,158,090.00
Rp 938,692.56
Rp 2,706,318.00
Rp 1,126,431.07
Rp 16,369,215.97

Rp 1,145,874.41
Rp 1,145,874.41

Rp 1,000,000.00

Tugas Besar Rencana Anggaran dan Biaya 2017 198


Jumlah Harga
c+e
Rp 1,000,000.00
Rp 716,107,231.69
Rp 71,610,723.17
Rp 787,717,954.86

Tugas Besar Rencana Anggaran dan Biaya 2017 199


REKAPITULASI
Jumlah Harga
No Uraian Pekerjaan
( Rp )
I Pekerjaan Persiapan Rp 20,346,047.50
II Pekerjaan Tanah dan Urugan Rp 10,715,050.25
III Pekerjaan Pasangan dan Plesteran Rp 300,645,808.25
IV Pekerjaan Beton Rp 67,549,135.16
V Pekerjaan Kayu dan Kaca Rp 23,364,901.42
VI Pekerjaan Penutup Atap dan Plafon Rp 19,885,463.61
VII Pekerjaan Lantai Rp 84,710,963.46
VIII Pekerjaan Instalasi Listrik dan Air Rp 19,049,796.98
IX Pekerjaan Finishing Rp 146,509,335.51
X Pekerjaan Penggantung dan Pengunci Rp 4,815,639.17
XI Pekerjaan Septicktank dan Resapan Rp 16,369,215.97
XII Pekerjaan Besi Rp 1,145,874.41
XIII Pekerjaan Lain - Lain Rp 1,000,000.00
Jumlah Rp 716,107,231.69
PPN 10% Rp 71,610,723.17
Total Jumlah Rp 787,717,954.86
Pembulatan Rp 787,717,000.00
Terbilang :
Lima Ratus Delapan Puluh Enam Juta Enam Ratus Delapan Puluh
Dua Ribu Rupiah

Kupang, Juli 2017

Diperiksa Oleh : Dikerjakan Oleh :

Elsy E. Hangge,ST.,M.Eng Dinul Amin


NIP. 1981 0310 200501 2 001 NIM. 1506010018
JADWAL PELAKSANAAN PEKERJAAN
Harga Satuan Jumlah Harga Bobot Bulan I
No Uraian Pekerjaan Volume Satuan
( Rp ) ( Rp ) % M-1 M-2
I Pekerjaan Persiapan
1 Pembersihan Lahan 84.000 m2 Rp 10,120.00 Rp 850,080.00 0.118708 0.118708
2 Pemasangan Bouwplank 45.000 m' Rp 411,021.50 Rp 18,495,967.50 2.582849 1.291424
3 Penyediaan Air Bersih 1.000 LS Rp 1,000,000.00 Rp 1,000,000.00 0.139644 0.023274
II Pekerjaan Tanah dan Urugan
1 Pek. Galian Tanah Pondasi 86.670 m3 Rp 46,920.00 Rp 4,066,556.40 0.56787
2 Pek. Urugan Tanah Kembali 28.890 m 3
Rp 34,040.00 Rp 983,415.60 0.137328
3 Pek. Urugan Tanah Peninggi Lantai 88.120 m3 Rp 34,040.00 Rp 2,999,604.80 0.418876
4 Pek. Urugan Pasir Bawah Pondasi 0.000 m3 Rp 225,768.00 Rp - 0
5 Pek. Urugan Pasir Bawah Lantai 11.806 m 3
Rp 225,768.00 Rp 2,665,473.45 0.372217
III Pekerjaan Pasangan dan Plesteran
1 Pas. Aanstamping Batu Karang/Kali 35.845 m3 Rp 318,921.45 Rp 11,431,739.38 1.596373
2 Pas. Pondasi Karang/Kali ( 1pc : 5psr ) 39.323 m3 Rp 318,921.45 Rp 12,540,788.72 1.751245
3 Pas. Tembok Trasram ( 1pc : 3psr ) 178.662 m 2
Rp 281,908.13 Rp 50,366,269.43 7.033342
4 Pas. Tembok Biasa ( 1pc : 5 psr ) 436.360 m2 Rp 269,761.25 Rp 117,713,046.03 16.43791
5 Plesteran Tembok Trasram ( 1pc : 3psr ) 357.324 m2 Rp 53,342.87 Rp 19,060,685.89 2.661708
6 Plesteran Tembok Biasa ( 1pc : 5 psr ) 828.634 m 2
Rp 58,668.29 Rp 48,614,518.07 6.78872
7 Plesteran Pondasi Tepi Luar ( 1pc : 4psr ) 0.000 m2 Rp 59,878.20 Rp - 0
8 Acian Tembok 1657.267 m2 Rp 24,690.50 Rp 40,918,760.74 5.714055
IV Pekerjaan Beton
1 Cor Beton Slof ( 1 pc : 3 psr : 5 kr ) 0.000 m3 Rp 4,748,408.65 Rp - 0
2 Cor Beton Kolom ( 1 pc : 3 psr : 5 kr ) 5.923 m3 Rp 4,922,063.25 Rp 29,150,919.60 4.070748
3 Cor Beton Ringbalk ( 1 pc : 3 psr : 5 kr ) 2.790 m3 Rp 5,776,267.15 Rp 16,115,785.35 2.250471
4 Cor Beton Latei ( 1 pc : 3 psr : 5 kr ) 0.303 m 3
Rp 5,776,267.15 Rp 1,751,941.83 0.244648
5 Cor Plat Beton ( 1 pc : 3 psr : 5 kr ) 3.150 m3 Rp 4,983,128.25 Rp 15,696,853.99 2.19197
6 Cor Meja Beton ( 1 pc : 3 psr : 5 kr ) 0.535 m3 Rp 4,983,128.25 Rp 2,665,973.61 0.372287
7 Cor Bak Beton ( 1 pc : 3 psr : 5 kr ) 0.435 m 3
Rp 4,983,128.25 Rp 2,167,660.79 0.302701
8 Carport ( 1 pc : 3 psr : 5 kr ) 0.000 m3 Rp 4,983,128.25 Rp - 0
V Pekerjaan Kayu dan Kaca
1 Pas. Kayu Kusen Kelas I 0.217 m2 Rp 6,496,005.00 Rp 1,410,620.48 0.196985
2 Pas. Kusen Alumunium 0.036 m' Rp 105,122.31 Rp 3,799.54 0.000531
3 Pas. Daun Pintu dan Jendela 24.000 m2 Rp 373,715.50 Rp 8,969,172.00 1.25249
4 Pas. Kaca Pada Pintu dan Jendela 0.539 m2 Rp 134,334.49 Rp 72,472.92 0.01012
5 Pas. Kayu Gording 8/10 1.734 m3 Rp 4,189,266.00 Rp 7,262,511.54 1.014165
6 Pas. Kayu Listplank 3 x 20 170.833 m' Rp 60,789.00 Rp 10,384,787.50 1.450172
7 Pas. Kayu Kuda - Kuda -0.828 m3 Rp 5,719,410.00 -Rp 4,738,462.55 -0.6617
VI Pekerjaan Penutup Atap dan Plafon
1 Pas. Atap Seng Gelombang BJLS 0.3 13.173 m3 Rp 62,895.80 Rp 828,545.24 0.115701
2 Pas. Atap Bubungan Seng Licin 3.880 m' Rp 118,216.55 Rp 458,680.21 0.064052
3 Pas. Rangka Plafon 131.100 m2 Rp 74,232.50 Rp 9,731,880.75 1.358998
4 Pas. Langit - Langit Tripleks 131.100 m2 Rp 44,102.50 Rp 5,781,837.75 0.807398
5 Pas. List Plafon 138.500 m' Rp 22,270.90 Rp 3,084,519.65 0.430734
VII Pekerjaan Lantai
1 Pas. Lantai Keramik 60x60 89.000 m2 Rp 193,323.63 Rp 17,205,802.63 2.402685
2 Pas. Lantai Keramik 30x30 5.250 m 2
Rp 164,516.13 Rp 863,709.66 0.120612
3 Pas. Keramik Mozaik 30x30 3.000 m2 Rp 1,243,118.38 Rp 3,729,355.13 0.520782
4 Pas. Keramik Dinding Porselin 10x20 264.740 m2 Rp 232,098.75 Rp 61,445,823.08 8.580534
5 Pas. Keramik Plint 10x20 56.660 m' Rp 25,878.45 Rp 1,466,272.98 0.204756
VIII Pekerjaan Instalasi Listrik dan Air
1 Pas. Saklar Tungal 9.000 Buah Rp 36,547.00 Rp 328,923.00 0.045932
2 Pas. Saklar Seri 3.000 Buah Rp 39,422.00 Rp 118,266.00 0.016515
3 Pas. Stop Kontak 9.000 Buah Rp 95,450.00 Rp 859,050.00 0.119961
4 Pas. Lampu Hias 4.000 Buah Rp 704,375.00 Rp 2,817,500.00 0.393447
5 Pas. Lampu Ruangan 6.000 Buah Rp 704,375.00 Rp 4,226,250.00 0.59017
6 Pas. Lampu KM/WC 1.000 Buah Rp 704,375.00 Rp 704,375.00 0.098362
7 Pas. Lampu Pijar 2.000 Buah Rp 704,375.00 Rp 1,408,750.00 0.196723
8 Pas. Lampu Tidur 4.000 Buah Rp 704,375.00 Rp 2,817,500.00 0.393447
9 Pas. Panel Pembagi ( M C B ) 1.000 Buah Rp 539,350.00 Rp 539,350.00 0.075317
10 Pas. Wastafel 1.000 Buah Rp 1,595,478.12 Rp 1,595,478.12 0.222799
11 Pas. Closet Jongkok 1.000 Buah Rp 367,534.25 Rp 367,534.25 0.051324
12 Pas. Kran Air 3.000 Buah Rp 104,282.00 Rp 312,846.00 0.043687
13 Pas. Kitchen Zink 1.000 Buah Rp 1,543,288.50 Rp 1,543,288.50 0.215511
14 Pipa PVC, ∅4" 1.000 m' Rp 270,695.63 Rp 270,695.63 0.037801
15 Pipa PVC, ∅3" 1.000 m' Rp 166,515.69 Rp 166,515.69 0.023253
16 Pipa PVC, ∅1" 1.000 m' Rp 143,647.65 Rp 143,647.65 0.02006
17 Pipa Hawa, ∅1" 1.000 m' Rp 143,647.65 Rp 143,647.65 0.02006
18 Pas. Floor Drain 1.000 Buah Rp 31,429.50 Rp 31,429.50 0.004389
19 Pas. Kabel Listrik 43.650 m Rp 15,000.00 Rp 654,750.00 0.091432
IX Pekerjaan Finishing
1 Cat Tembok 1657.267 m2 Rp 27,967.43 Rp 46,349,501.71 6.472425
2 Cat Plafon 131.100 m 2
Rp 27,967.43 Rp 3,666,529.42 0.512008
3 Cat Kayu 1858.177 m2 Rp 50,718.45 Rp 94,243,850.50 13.16058
4 List Plafon 4.155 m2 Rp 50,718.45 Rp 210,735.16 0.029428
5 Teac Oil 48.000 m 2
Rp 28,111.75 Rp 1,349,364.00 0.18843
6 Cat Seng 35.884 m2 Rp 19,210.75 Rp 689,354.71 0.096264
X Pekerjaan Penggantung dan Pengunci
1 Pas. Kunci Double Slaag 7.000 Buah Rp 193,349.50 Rp 1,353,446.50 0.189001
2 Pas. Kunci KM/WC 1.000 Buah Rp 169,884.90 Rp 169,884.90 0.023723
3 Pas. Grendel 16.000 Buah Rp 47,984.90 Rp 767,758.40 0.107213
4 Pas. Engsel Pintu Kayu 21.000 Buah Rp 27,039.49 Rp 567,829.29 0.079294
5 Pas. Engsel Pintu Alumunium 2.000 Buah Rp 28,764.49 Rp 57,528.98 0.008034
6 Pas. Engsel Jendela 32.000 Buah Rp 22,431.90 Rp 717,820.80 0.100239
7 Pas. Kait Angin 32.000 Buah Rp 29,935.65 Rp 957,940.80 0.133771
8 Pas. Door Stopper 1.000 Buah Rp 123,429.50 Rp 123,429.50 0.017236
9 Pas. Mur , Baut dan Beugel 1.000 Ls Rp 100,000.00 Rp 100,000.00 0.013964
XI Pekerjaan Septicktank dan Resapan
1 Galian Septicktank dan Resapan 7.000 m3 Rp 57,546.00 Rp 402,822.00 0.056252
2 Urugan Tanah Kembali 2.333 m3 Rp 34,040.00 Rp 79,426.67 0.011091
3 Urugan Pasir Bidang Resapan 0.053 m 3
Rp 225,768.00 Rp 11,852.82 0.001655
4 Pas. Batu Kosong Bidang Resapan 0.420 m3 Rp 318,921.45 Rp 133,947.01 0.018705
5 Pas. Batu Pecah Bidang Resapan 0.420 m3 Rp 630,801.45 Rp 264,936.61 0.036997
6 Pas. Kerikil Bidang Resapan 0.315 m 3
Rp 159,531.45 Rp 50,252.41 0.007017
7 Pas. Batu Karang Bidang Resapan 0.524 m3 Rp 140,901.45 Rp 73,888.72 0.010318
8 Cor Rabat Beton 0.468 m3 Rp 4,983,128.25 Rp 2,329,612.46 0.325316
9 Cor Plat Beton Septicktank 0.400 m 3
Rp 4,983,128.25 Rp 1,993,251.30 0.278345
10 Cor Plat Beton Resapan 0.300 m3 Rp 4,983,128.25 Rp 1,494,938.48 0.208759
11 Cor Kolom Praktis 0.529 m3 Rp 4,922,063.25 Rp 2,604,755.87 0.363738
12 Pek. Pasangan Tembok Biasa ( Resapan ) 8.000 m2 Rp 269,761.25 Rp 2,158,090.00 0.301364
13 Pek. Plesteran Tembok Biasa ( Resapan ) 16.000 m 2
Rp 58,668.29 Rp 938,692.56 0.131083
14 Pek. Pasangan Tembok Trasram ( ST ) 9.600 m2 Rp 281,908.13 Rp 2,706,318.00 0.377921
15 Pek. Plesteran Tembok Trasram ( ST ) 19.200 m2 Rp 58,668.29 Rp 1,126,431.07 0.157299
XII Pekerjaan Besi
1 Pemasangan Gerbang Partisi Besi Hollow 7.378 m2 Rp 155,320.15 Rp 1,145,874.41 0.160014
XIII Pekerjaan Lain - Lain
1 Pembersihan Kembali 1.000 Ls Rp 1,000,000.00 Rp 1,000,000.00 0.139644
PROGRES RENCANA PEKERJAAN Rp 716,107,231.69 100 0 1.433407
PROGRES KUMULATIF RENCANA PEKERJAAN 0 1.433407
PEKERJAAN
Bulan I Bulan II Bulan III
M-3 M-4 M-5 M-6 M-7 M-8 M-9 M - 10 M - 11 M - 12

1.291424
0.023274 0.023274 0.023274 0.023274 0.023274

0.56787
0.137328
0.418876
0
0.372217

1.596373
1.751245
2.344447 2.344447 2.344447
4.109477 4.109477 4.109477 4.109477
1.330854 1.330854
3.39436 3.39436
0
2.857027 2.857027

0 0 0
1.356916 1.356916 1.356916
0.750157 0.750157 0.750157
0.244648
1.095985 1.095985
0.372287
0.302701
0

0.098492 0.098492
0.000531
1.25249
0.01012
1.014165
1.450172
-0.6617

0.115701
0.064052
1.358998
0.807398
0.430734

2.402685
0.120612
0.520782
8.580534
0.204756

0.045932
0.016515
0.119961
0.393447
0.59017
0.098362
0.196723
0.393447
0.075317
0.222799
0.051324
0.043687
0.215511
0.037801
0.023253
0.02006
0.02006
0.004389
0.091432

3.236212 3.236212
0.512008
4.386859 4.386859 4.386859
0.029428
0.18843
0.096264

0.189001
0.023723
0.107213
0.079294
0.008034
0.100239
0.133771
0.017236
0.013964

0.056252
0.011091
0.001655
0.018705
0.036997
0.007017
0.010318
0.325316
0.278345
0.208759
0.363738
0.301364
0.131083
0.377921
0.157299

0.160014

0.139644
1.291424 12.69499 11.64371 11.33153 13.46463 17.95737 19.47571 9.89938 0.644922 0.162918
2.724831 15.41982 27.06354 38.39506 51.8597 69.81707 89.29278 99.19216 99.83708 100
ANALISA KEBUTUHAN TENAGA, BAHAN DAN ALAT
Jumlah Kebutuhan
Total
No Uraian Pekerjaan Volume Satuan Koefisien
Tenaga Bahan Alat
Tenaga
I Pekerjaan Persiapan
1 Pembersihan Lahan 84.000 m2
A TENAGA
Pekerja OH 0.1000 8.4 - - 9
Mandor OH 0.0500 4.2 - - 5
2 Pemasangan Bouwplank 45.000 m'
A TENAGA
Pekerja OH 0.1000 4.5 - - 5
Tukang Kayu OH 0.1000 4.5 - - 5
Kepala Tukang OH 0.0100 0.45 - - 1
Mandor OH 0.0050 0.225 - - 1
B BAHAN
Kayu Usuk Kelas II m3 0.1200 - 5.4 - -
Paku Biasa Kg 0.0200 - 0.9 - -
Kayu Papan Kelas II m3 0.0070 - 0.315 - -

II Pekerjaan Tanah dan Urugan


1 Pek. Galian Tanah Pondasi 86.670 m3
A TENAGA
Pekerja OH 0.7500 65.0025 - - 66
Mandor OH 0.0250 2.16675 - - 3
2 Pek. Urugan Tanah Kembali 28.890 m3
A TENAGA
Pekerja OH 0.3000 8.667 - - 9

Tugas Besar Rencana Anggaran dan Biaya 205


Jumlah Kebutuhan
Total
No Uraian Pekerjaan Volume Satuan Koefisien
Tenaga Bahan Alat
Tenaga
Mandor OH 0.0100 0.2889 - - 1
3 Pek. Urugan Tanah Peninggi Lantai 88.120 m3
A TENAGA
Pekerja OH 0.3000 26.436 - - 27
Mandor OH 0.0100 0.8812 - - 1
4 Pek. Urugan Pasir Bawah Pondasi 0.000 m3
A TENAGA
Pekerja OH 0.3000 0 - - 0
Mandor OH 0.0100 0 - - 0
B BAHAN
Pasir Urug m3 1.2000 - 0 - -
5 Pek. Urugan Pasir Bawah Lantai 11.806 m3
A TENAGA
Pekerja OH 0.3000 3.541875 - - 4
Mandor OH 0.0100 0.1180625 - - 1
B BAHAN
Pasir Urug m3 1.2000 - 14.1675 - -
III Pekerjaan Pasangan dan Plesteran
1 Pas. Aanstamping Batu Karang/Kali 35.845 m3
A TENAGA
Pekerja OH 0.7800 27.9591 - - 28.000
Tukang Batu OH 0.3900 13.97955 - - 14.000
Kepala Tukang OH 0.0390 1.397955 - - 2.000
Mandor OH 0.0390 1.397955 - - 2.000
B BAHAN
Batu Belah m3 1.2000 - 43.014 - -
Pasir Urug m3 0.4320 - 15.48504 - -

Tugas Besar Rencana Anggaran dan Biaya 206


Jumlah Kebutuhan
Total
No Uraian Pekerjaan Volume Satuan Koefisien
Tenaga Bahan Alat
Tenaga
2 Pas. Pondasi Karang/Kali ( 1pc : 5psr ) 39.323 m 3

A TENAGA
Pekerja OH 0.7800 30.67155 - - 31.000
Tukang Batu OH 0.3900 15.335775 - - 16.000
Kepala Tukang OH 0.0390 1.5335775 - - 2.000
Mandor OH 0.0390 1.5335775 - - 2.000
B BAHAN
Batu Belah m3 1.2000 - 47.187 - -
Pasir Urug m3 0.4320 - 16.98732 - -
3 Pas. Tembok Trasram ( 1pc : 3psr ) 178.662 m2
A TENAGA
Pekerja OH 0.6000 107.1972 - - 108.000
Tukang Batu OH 0.2000 35.7324 - - 36.000
Kepala Tukang OH 0.0200 3.57324 - - 4.000
Mandor OH 0.0300 5.35986 - - 6.000
B BAHAN
Bata Merah Buah 140.0000 - 25012.68 - -
Semen Portland Kg 32.9500 - 5886.9129 - -
Pasir Pasang m3 0.0910 - 16.258242 - -
4 Pas. Tembok Biasa ( 1pc : 5 psr ) 436.360 m2
A TENAGA
Pekerja OH 0.6000 261.81606 - - 262.000
Tukang Batu OH 0.2000 87.27202 - - 88.000
Kepala Tukang OH 0.0200 8.727202 - - 9.000
Mandor OH 0.0300 13.090803 - - 14.000
B BAHAN
Bata Merah Buah 140.0000 - 61090.414 - -

Tugas Besar Rencana Anggaran dan Biaya 207


Jumlah Kebutuhan
Total
No Uraian Pekerjaan Volume Satuan Koefisien
Tenaga Bahan Alat
Tenaga
Semen Portland Kg 22.2000 - 9687.1942 - -
Pasir Pasang m3 0.1020 - 44.50873 - -
5 Plesteran Tembok Trasram ( 1pc : 3psr ) 357.324 m2
A TENAGA
Pekerja OH 0.2600 92.90424 - - 93.000
Tukang Batu OH 0.2000 71.4648 - - 72.000
Kepala Tukang OH 0.0200 7.14648 - - 8.000
Mandor OH 0.0130 4.645212 - - 5.000
B BAHAN
Semen Portland Kg 10.3680 - 3704.7352 - -
Pasir Pasang m3 0.0310 - 11.077044 - -
6 Plesteran Tembok Biasa ( 1pc : 5 psr ) 828.634 m2
A TENAGA
Pekerja OH 0.4000 331.45348 - - 332.000
Tukang Batu OH 0.2000 165.72674 - - 166.000
Kepala Tukang OH 0.0200 16.572674 - - 17.000
Mandor OH 0.0220 18.2299414 - - 19.000
B BAHAN
Semen Portland 0 6.9120 - 5727.5161 - -
Pasir Pasang m3 0.0350 - 29.00218 - -
7 Plesteran Pondasi Tepi Luar ( 1pc : 4psr ) 0.000 m2
A TENAGA
Pekerja OH 0.4000 0 - - 0.000
Tukang Batu OH 0.2000 0 - - 0.000
Kepala Tukang OH 0.0200 0 - - 0.000
Mandor OH 0.0220 0 - - 0.000
B BAHAN

Tugas Besar Rencana Anggaran dan Biaya 208


Jumlah Kebutuhan
Total
No Uraian Pekerjaan Volume Satuan Koefisien
Tenaga Bahan Alat
Tenaga
Semen Portland Kg 8.3200 - 0 - -
Pasir Pasang m3 0.0320 - 0 - -
8 Acian Tembok 1657.267 m2
A TENAGA
Pekerja OH 0.2000 331.45348 - - 332.000
Tukang Batu OH 0.1000 165.72674 - - 166.000
Kepala Tukang OH 0.0100 16.572674 - - 17.000
Mandor OH 0.0100 16.572674 - - 17.000
B BAHAN
Semen Portland Kg 3.2500 - 5386.1191 - -
IV Pekerjaan Beton
1 Cor Beton Slof ( 1 pc : 3 psr : 5 kr ) 0.000 m3
A TENAGA
Pekerja OH 5.6500 0 - - 0.000
Tukang Batu OH 0.2750 0 - - 0.000
Tukang Kayu OH 1.5600 0 - - 0.000
Tukang Besi OH 1.4000 0 - - 0.000
Kepala Tukang OH 0.3230 0 - - 0.000
Mandor OH 0.2830 0 - - 0.000
B BAHAN
Kayu Kelas III m3 0.2700 - 0 - -
Paku 5- 12 cm Kg 2.0000 - 0 - -
Minyak Bekisting Liter 0.6000 - 0 - -
Besi Beton Polos Kg 210.0000 - 0 - -
Kawat Beton Kg 3.0000 - 0 - -
Semen Portland Kg 336.0000 - 0 - -
Pasir Beton m3 0.5400 - 0 - -

Tugas Besar Rencana Anggaran dan Biaya 209


Jumlah Kebutuhan
Total
No Uraian Pekerjaan Volume Satuan Koefisien
Tenaga Bahan Alat
Tenaga
Kerikil m 3
0.8100 - 0 - -
2 Cor Beton Kolom ( 1 pc : 3 psr : 5 kr ) 5.9225 m3
A TENAGA
Pekerja OH 5.3000 31.38925 - - 32.000
Tukang Batu OH 0.2750 1.6286875 - - 2.000
Tukang Kayu OH 1.3000 7.69925 - - 8.000
Tukang Besi OH 1.5000 8.88375 - - 9.000
Kepala Tukang OH 0.2650 1.5694625 - - 2.000
Mandor OH 0.2650 1.5694625 - - 2.000
B BAHAN
Kayu Balok Kelas II m3 0.1200 - 0.7107 - -
Kayu Kelas III m3 0.3200 - 1.8952 - -
Paku 5- 12 cm Kg 3.2000 - 18.952 - -
Minyak Bekisting Liter 1.6000 - 9.476 - -
Besi Beton Polos Kg 157.5000 - 932.79375 - -
Kawat Beton Kg 2.2500 - 13.325625 - -
Semen Portland Kg 336.0000 - 1989.96 - -
Pasir Beton m3 0.5400 - 3.19815 - -
Kerikil m3 0.8100 - 4.797225 - -
Dolken Kayu btg 3.2000 - 18.952 - -
Plywood 9 mm lbr 2.8000 - 16.583 - -
3 Cor Beton Ringbalk ( 1 pc : 3 psr : 5 kr ) 2.79 m3
A TENAGA
Pekerja OH 6.3500 17.7165 - - 18.000
Tukang Batu OH 0.2750 0.76725 - - 1.000
Tukang Kayu OH 1.6500 4.6035 - - 5.000
Tukang Besi OH 1.4000 3.906 - - 4.000

Tugas Besar Rencana Anggaran dan Biaya 210


Jumlah Kebutuhan
Total
No Uraian Pekerjaan Volume Satuan Koefisien
Tenaga Bahan Alat
Tenaga
Kepala Tukang OH 0.3330 0.92907 - - 1.000
Mandor OH 0.3180 0.88722 - - 1.000
B BAHAN
Kayu Kelas III m3 0.3200 - 0.8928 - -
Paku 5- 12 cm Kg 3.2000 - 8.928 - -
Minyak Bekisting Liter 1.6000 - 4.464 - -
Besi Beton Polos Kg 210.0000 - 585.9 - -
Kawat Beton Kg 3.0000 - 8.37 - -
Semen Portland Kg 336.0000 - 937.44 - -
Pasir Beton m3 0.5400 - 1.5066 - -
Kerikil m3 0.8100 - 2.2599 - -
Kayu Kelas II Balok m3 0.1400 - 0.3906 - -
Plywood 9 mm Lbr 2.8000 - 7.812 - -
Dolken Kayu btg 16.0000 - 44.64 - -
4 Cor Beton Latei ( 1 pc : 3 psr : 5 kr ) 0.3033 m3
A TENAGA
Pekerja OH 6.3500 1.925955 - - 2.000
Tukang Batu OH 0.2750 0.0834075 - - 1.000
Tukang Kayu OH 1.6500 0.500445 - - 1.000
Tukang Besi OH 1.4000 0.42462 - - 1.000
Kepala Tukang OH 0.3330 0.1009989 - - 1.000
Mandor OH 0.3180 0.0964494 - - 1.000
B BAHAN
Kayu Kelas III m3 0.3200 - 0.097 - -
Paku 5- 12 cm Kg 3.2000 - 0.971 - -
Minyak Bekisting Liter 1.6000 - 0.485 - -
Besi Beton Polos Kg 210.0000 - 63.693 - -

Tugas Besar Rencana Anggaran dan Biaya 211


Jumlah Kebutuhan
Total
No Uraian Pekerjaan Volume Satuan Koefisien
Tenaga Bahan Alat
Tenaga
Kawat Beton Kg 3.0000 - 0.910 - -
Semen Portland Kg 336.0000 - 101.909 - -
Pasir Beton m3 0.5400 - 0.164 - -
Kerikil m3 0.8100 - 0.246 - -
Kayu Kelas II Balok m 3
0.1400 - 0.042 - -
Plywood 9 mm m3 2.8000 - 0.849 - -
Dolken Kayu btg 16.0000 - 4.853 - -
5 Cor Plat Beton ( 1 pc : 3 psr : 5 kr ) 3.15 m3
A TENAGA
Pekerja OH 5.3000 16.695 - - 17.000
Tukang Batu OH 0.2750 0.86625 - - 1.000
Tukang Kayu OH 1.3000 4.095 - - 5.000
Tukang Besi OH 1.0500 3.3075 - - 4.000
Kepala Tukang OH 0.2650 0.83475 - - 1.000
Mandor OH 0.2650 0.83475 - - 1.000
B BAHAN
Kayu Kelas III m3 0.3200 - 1.008 - -
Kayu Kelas II Balok m3 0.1200 - 0.378 - -
Paku 5- 12 cm kg 3.2000 - 10.080 - -
Minyak Bekisting Liter 1.6000 - 5.040 - -
Besi Beton Polos kg 157.5000 - 496.125 - -
Kawat Beton kg 2.2500 - 7.088 - -
Semen Portland kg 336.0000 - 1058.400 - -
Pasir Beton m3 0.5400 - 1.701 - -
Kerikil m3 0.8100 - 2.552 - -
Plywood 9 mm lbr 2.8000 - 8.820 - -
Dolken Kayu btg 32.0000 - 100.800 - -

Tugas Besar Rencana Anggaran dan Biaya 212


Jumlah Kebutuhan
Total
No Uraian Pekerjaan Volume Satuan Koefisien
Tenaga Bahan Alat
Tenaga
6 Cor Meja Beton ( 1 pc : 3 psr : 5 kr ) 0.535 m 3

A TENAGA
Pekerja OH 5.3000 2.8355 - - 3.000
Tukang Batu OH 0.2750 0.147125 - - 1.000
Tukang Kayu OH 1.3000 0.6955 - - 1.000
Tukang Besi OH 1.0500 0.56175 - - 1.000
Kepala Tukang OH 0.2650 0.141775 - - 1.000
Mandor OH 0.2650 0.141775 - - 1.000
B BAHAN
Kayu Kelas III m3 0.3200 - 0.171 - -
Kayu Kelas II Balok m3 0.1200 - 0.064 - -
Paku 5- 12 cm kg 3.2000 - 1.712 - -
Minyak Bekisting Liter 1.6000 - 0.856 - -
Besi Beton Polos kg 157.5000 - 84.263 - -
Kawat Beton kg 2.2500 - 1.204 - -
Semen Portland kg 336.0000 - 179.760 - -
Pasir Beton m3 0.5400 - 0.289 - -
Kerikil m3 0.8100 - 0.433 - -
Plywood 9 mm lbr 2.8000 - 1.498 - -
Dolken Kayu btg 32.0000 - 17.120 - -
7 Cor Bak Beton ( 1 pc : 3 psr : 5 kr ) 0.435 m3
A TENAGA
Pekerja OH 5.3000 2.3055 - - 3.000
Tukang Batu OH 0.2750 0.119625 - - 1.000
Tukang Kayu OH 1.3000 0.5655 - - 1.000
Tukang Besi OH 1.0500 0.45675 - - 1.000
Kepala Tukang OH 0.2650 0.115275 - - 1.000

Tugas Besar Rencana Anggaran dan Biaya 213


Jumlah Kebutuhan
Total
No Uraian Pekerjaan Volume Satuan Koefisien
Tenaga Bahan Alat
Tenaga
Mandor OH 0.2650 0.115275 - - 1.000
B BAHAN
Kayu Kelas III m3 0.3200 - 0.139 - -
Kayu Kelas II Balok m3 0.1200 - 0.052 - -
Paku 5- 12 cm kg 3.2000 - 1.392 - -
Minyak Bekisting Liter 1.6000 - 0.696 - -
Besi Beton Polos kg 157.5000 - 68.513 - -
Kawat Beton kg 2.2500 - 0.979 - -
Semen Portland kg 336.0000 - 146.160 - -
Pasir Beton m3 0.5400 - 0.235 - -
Kerikil m3 0.8100 - 0.352 - -
Plywood 9 mm lbr 2.8000 - 1.218 - -
Dolken Kayu btg 32.0000 - 13.920 - -
8 Carport ( 1 pc : 3 psr : 5 kr ) 0 m3
A TENAGA
Pekerja OH 5.3000 0 - - 0.000
Tukang Batu OH 0.2750 0 - - 0.000
Tukang Kayu OH 1.3000 0 - - 0.000
Tukang Besi OH 1.0500 0 - - 0.000
Kepala Tukang OH 0.2650 0 - - 0.000
Mandor OH 0.2650 0 - - 0.000
B BAHAN
Kayu Kelas III m3 0.3200 - 0.000 - -
Kayu Kelas II Balok m3 0.1200 - 0.000 - -
Paku 5- 12 cm kg 3.2000 - 0.000 - -
Minyak Bekisting Liter 1.6000 - 0.000 - -
Besi Beton Polos kg 157.5000 - 0.000 - -

Tugas Besar Rencana Anggaran dan Biaya 214


Jumlah Kebutuhan
Total
No Uraian Pekerjaan Volume Satuan Koefisien
Tenaga Bahan Alat
Tenaga
Kawat Beton kg 2.2500 - 0.000 - -
Semen Portland kg 336.0000 - 0.000 - -
Pasir Beton m3 0.5400 - 0.000 - -
Kerikil m3 0.8100 - 0.000 - -
Plywood 9 mm lbr 2.8000 - 0.000 - -
Dolken Kayu btg 32.0000 - 0.000 - -
V Pekerjaan Kayu dan Kaca
1 Pas. Kayu Kusen Kelas I 0.217152 m2
A TENAGA
Pekerja OH 7.0000 1.520064 - - 2.000
Tukang Kayu OH 21.0000 4.560192 - - 5.000
Kepala Tukang OH 2.1000 0.4560192 - - 1.000
Mandor OH 0.3500 0.0760032 - - 1.000
B BAHAN
Balok Kayu m3 1.1000 - 0.239 - -
Paku 10 cm Kg 1.2500 - 0.271 - -
Lem Kayu Kg 1.0000 - 0.217 - -
2 Pas. Kusen Alumunium 0.036144 m2
A TENAGA
Pekerja OH 0.0430 0.001554 - - 1.000
Tukang Khusus Alumunium OH 0.0430 0.001554 - - 1.000
Kepala Tukang OH 0.0043 0.000155 - - 1.000
Mandor OH 0.0021 0.000076 - - 1.000
B BAHAN
Profil Alumunium m' 1.1000 - 0.040 - -
Sekrup Fixer Buah 2.0000 - 0.072 - -
Sealent Tube 0.0600 - 0.002 - -

Tugas Besar Rencana Anggaran dan Biaya 215


Jumlah Kebutuhan
Total
No Uraian Pekerjaan Volume Satuan Koefisien
Tenaga Bahan Alat
Tenaga
3 Pas. Daun Pintu dan Jendela 24 m 2

A TENAGA
Pekerja OH 0.7000 16.800000 - - 17.000
Tukang Kayu OH 2.1000 50.400000 - - 51.000
Kepala Tukang OH 0.2100 5.040000 - - 6.000
Mandor OH 0.0350 0.840000 - - 1.000
B BAHAN
Papan Kayu m3 0.0250 - 0.600 - -
Paku 1 - 2.5 cm Kg 0.0300 - 0.720 - -
Lem Kayu Kg 0.5000 - 12.000 - -
Plywood 4 mm Lbr 1.0000 - 24.000 - -
4 Pas. Kaca Pada Pintu dan Jendela 0.539496 m2
A TENAGA
Pekerja OH 0.0150 0.008092 - - 1.000
Tukang Kayu OH 0.1500 0.080924 - - 1.000
Kepala Tukang OH 0.0150 0.008092 - - 1.000
Mandor OH 0.0008 0.000432 - - 1.000
B BAHAN
Kaca Tebal 5 mm m2 1.1000 - 0.593 - -
Sealent Kg 0.0500 - 0.027 - -
5 Pas. Kayu Gording 8/10 1.7336 m3
A TENAGA
Pekerja OH 2.4000 4.160640 - - 5.000
Tukang Kayu OH 7.2000 12.481920 - - 13.000
Kepala Tukang OH 0.7200 1.248192 - - 2.000
Mandor OH 0.1200 0.208032 - - 1.000
B BAHAN

Tugas Besar Rencana Anggaran dan Biaya 216


Jumlah Kebutuhan
Total
No Uraian Pekerjaan Volume Satuan Koefisien
Tenaga Bahan Alat
Tenaga
Balok Kayu m 3
1.1000 - 1.907 - -
Besi Strip Tebal 5 mm Kg 15.0000 - 26.004 - -
Paku 12 cm Kg 3.0000 - 5.201 - -
6 Pas. Kayu Listplank 3 x 20 170.8333 m'
A TENAGA
Pekerja OH 0.1000 17.083333 - - 18.000
Tukang Kayu OH 0.2000 34.166667 - - 35.000
Kepala Tukang OH 0.0200 3.416667 - - 4.000
Mandor OH 0.0050 0.854167 - - 1.000
B BAHAN
Papan Kayu m3 0.0108 - 1.845 - -
Paku 5- 7 cm Kg 0.1000 - 17.083 - -
7 Pas. Kayu Kuda - Kuda -0.82849 m3
A TENAGA
Pekerja OH 4.0000 -3.313952 - - -4.000
Tukang Kayu OH 12.0000 -9.941856 - - -10.000
Kepala Tukang OH 1.2000 -0.994186 - - -1.000
Mandor OH 0.2000 -0.165698 - - -1.000
B BAHAN
Balok Kayu m3 1.1000 - -0.911 - -
Besi Strip Tebal 5 mm Kg 15.0000 - -12.427 - -
Paku 12 cm Kg 5.6000 - -4.640 - -
VI Pekerjaan Penutup Atap dan Plafon
1 Pas. Atap Seng Gelombang BJLS 0.3 13.1733 m3
A TENAGA
Pekerja OH 0.1200 1.580796 - - 2.000
Tukang Kayu OH 0.0600 0.790398 - - 1.000
Kepala Tukang OH 0.0060 0.079040 - - 1.000

Tugas Besar Rencana Anggaran dan Biaya 217


Jumlah Kebutuhan
Total
No Uraian Pekerjaan Volume Satuan Koefisien
Tenaga Bahan Alat
Tenaga
Mandor OH 0.0060 0.079040 - - 1.000
B BAHAN
Seng Gelombang 3"x6" Lbr 0.7000 - 9.221 - -
Paku Biasa 1/2" - 1" Kg 0.0200 - 0.263 - -
2 Pas. Atap Bubungan Seng Licin 3.88 m'
A TENAGA
Pekerja OH 0.1500 0.582000 - - 1.000
Tukang Kayu OH 0.0700 0.271600 - - 1.000
Kepala Tukang OH 0.0070 0.027160 - - 1.000
Mandor OH 0.0060 0.023280 - - 1.000
B BAHAN
Seng Pelat 3"x6" Lbr 0.3000 - 1.164 - -
Paku Biasa 1/2" - 1" Kg 0.4000 - 1.552 - -
3 Pas. Rangka Plafon 131.1 m2
A TENAGA
Pekerja OH 0.1500 19.665000 - - 20.000
Tukang Kayu OH 0.3000 39.330000 - - 40.000
Kepala Tukang OH 0.0300 3.933000 - - 4.000
Mandor OH 0.0750 9.832500 - - 10.000
B BAHAN
Usuk 5x7 m3 0.0140 - 1.835 - -
Paku Kg 0.2000 - 26.220 - -
4 Pas. Langit - Langit Tripleks 131.1 m2
A TENAGA
Pekerja OH 0.1000 13.110000 - - 14.000
Tukang Kayu OH 0.1000 13.110000 - - 14.000
Kepala Tukang OH 0.0100 1.311000 - - 2.000
Mandor OH 0.0500 6.555000 - - 7.000

Tugas Besar Rencana Anggaran dan Biaya 218


Jumlah Kebutuhan
Total
No Uraian Pekerjaan Volume Satuan Koefisien
Tenaga Bahan Alat
Tenaga
B BAHAN
Tripleks Lbr 0.3750 - 49.163 - -
Paku Tripleks Kg 0.0300 - 3.933 - -
5 Pas. List Plafon 138.5 m'
A TENAGA
Pekerja OH 0.0500 6.925000 - - 7.000
Tukang Kayu OH 0.0500 6.925000 - - 7.000
Kepala Tukang OH 0.0050 0.692500 - - 1.000
Mandor OH 0.0030 0.415500 - - 1.000
B BAHAN
List Kayu Profil m' 1.0500 - 145.425 - -
Paku Kg 0.0100 - 1.385 - -
VII Pekerjaan Lantai
1 Pas. Lantai Keramik 60x60 89 m2
A TENAGA
Pekerja OH 0.7000 62.300000 - - 63.000
Tukang Batu OH 0.3500 31.150000 - - 32.000
Kepala Tukang OH 0.0350 3.115000 - - 4.000
Mandor OH 0.0350 3.115000 - - 4.000
B BAHAN
Ubin Keramik Dos 0.9200 - 81.880 - -
Semen Portland Kg 10.0000 - 890.000 - -
Pasir Pasang m3 0.0450 - 4.005 - -
Semen Warna Kg 0.5000 - 44.500 - -
2 Pas. Lantai Keramik 30x30 5.25 m2
A TENAGA
Pekerja OH 0.7000 3.675000 - - 4.000
Tukang Batu OH 0.3500 1.837500 - - 2.000

Tugas Besar Rencana Anggaran dan Biaya 219


Jumlah Kebutuhan
Total
No Uraian Pekerjaan Volume Satuan Koefisien
Tenaga Bahan Alat
Tenaga
Kepala Tukang OH 0.0350 0.183750 - - 1.000
Mandor OH 0.0350 0.183750 - - 1.000
B BAHAN
Ubin Keramik Dos 1.0500 - 5.513 - -
Semen Portland Kg 10.0000 - 52.500 - -
Pasir Pasang m3 0.0450 - 0.236 - -
Semen Warna Kg 0.5000 - 2.625 - -
3 Pas. Keramik Mozaik 30x30 3 m2
A TENAGA
Pekerja OH 0.7000 2.100000 - - 3.000
Tukang Batu OH 0.3500 1.050000 - - 2.000
Kepala Tukang OH 0.0350 0.105000 - - 1.000
Mandor OH 0.0350 0.105000 - - 1.000
B BAHAN
Ubin Keramik Dos 11.8700 - 35.610 - -
Semen Portland Kg 14.1500 - 42.450 - -
Pasir Pasang m3 0.0390 - 0.117 - -
Semen Warna Kg 2.0000 - 6.000 - -
4 Pas. Keramik Dinding Porselin 10x20 264.74 m2
A TENAGA
Pekerja OH 0.9000 238.266000 - - 239.000
Tukang Batu OH 0.4500 119.133000 - - 120.000
Kepala Tukang OH 0.0450 11.913300 - - 12.000
Mandor OH 0.0450 11.913300 - - 12.000
B BAHAN
Porselin Buah 53.0000 - 14031.220 - -
Semen Portland Kg 9.3000 - 2462.082 - -
Pasir Pasang m3 0.0180 - 4.765 - -

Tugas Besar Rencana Anggaran dan Biaya 220


Jumlah Kebutuhan
Total
No Uraian Pekerjaan Volume Satuan Koefisien
Tenaga Bahan Alat
Tenaga
Semen Warna Kg 2.7500 - 728.035 - -
5 Pas. Keramik Plint 10x20 56.66 m'
A TENAGA
Pekerja OH 0.0900 5.099400 - - 6.000
Tukang Batu OH 0.0900 5.099400 - - 6.000
Kepala Tukang OH 0.0090 0.509940 - - 1.000
Mandor OH 0.0050 0.283300 - - 1.000
B BAHAN
Plint Keramik Artistik Buah 5.3000 - 300.298 - -
Semen Portland Kg 1.1400 - 64.592 - -
Pasir Pasang m3 0.0030 - 0.170 - -
Semen Warna Kg 0.0250 - 1.417 - -
VII Pekerjaan Instalasi Listrik dan Air
1 Pas. Saklar Tungal 9 Buah
A TENAGA
Tukang Listrik OH 0.1600 1.44 - - 2.000
B BAHAN
Saklar Tunggal Buah 1.0000 - 9.000 - -
2 Pas. Saklar Seri 3 Buah
A TENAGA
Tukang Listrik OH 0.1600 0.48 - - 1.000
B BAHAN
Saklar Seri Buah 1.0000 - 3.000 - -
3 Pas. Stop Kontak 9 Buah
A TENAGA
Tukang Listrik OH 1.0000 9.000000 - - 9.000
B BAHAN
Stop Kontak Buah 1.0000 - 9.000 - -

Tugas Besar Rencana Anggaran dan Biaya 221


Jumlah Kebutuhan
Total
No Uraian Pekerjaan Volume Satuan Koefisien
Tenaga Bahan Alat
Tenaga
4 Pas. Lampu Hias 4 Buah
A TENAGA
Pekerja OH 1.0000 1.000000 - - 1.000
B BAHAN
Pipa Listrik 5/8" btg 3.0000 - 12.000 - -
Kabel m 24.0000 - 96.000 - -
T Dus buah 3.0000 - 12.000 - -
L Bow buah 4.0000 - 16.000 - -
Las Dop buah 3.0000 - 12.000 - -
Klem buah 24.0000 - 96.000 - -
Mongkok buah 1.0000 - 4.000 - -
Saklar buah 1.0000 - 4.000 - -
Fitting buah 1.0000 - 4.000 - -
5 Pas. Lampu Ruangan 6 Buah
A TENAGA
Pekerja OH 1.0000 1.000000 - - 1.000
B BAHAN
Pipa Listrik 5/8" btg 3.0000 - 18.000 - -
Kabel m 24.0000 - 144.000 - -
T Dus buah 3.0000 - 18.000 - -
L Bow buah 4.0000 - 24.000 - -
Las Dop buah 3.0000 - 18.000 - -
Klem buah 24.0000 - 144.000 - -
Mongkok buah 1.0000 - 6.000 - -
Saklar buah 1.0000 - 6.000 - -
Fitting buah 1.0000 - 6.000 - -
6 Pas. Lampu KM/WC 1 Buah
A TENAGA
Pekerja OH 1.0000 1.000000 - - 1.000

Tugas Besar Rencana Anggaran dan Biaya 222


Jumlah Kebutuhan
Total
No Uraian Pekerjaan Volume Satuan Koefisien
Tenaga Bahan Alat
Tenaga
B BAHAN
Pipa Listrik 5/8" btg 3.0000 - 3.000 - -
Kabel m 24.0000 - 24.000 - -
T Dus buah 3.0000 - 3.000 - -
L Bow buah 4.0000 - 4.000 - -
Las Dop buah 3.0000 - 3.000 - -
Klem buah 24.0000 - 24.000 - -
Mongkok buah 1.0000 - 1.000 - -
Saklar buah 1.0000 - 1.000 - -
Fitting buah 1.0000 - 1.000 - -
7 Pas. Lampu Pijar 2 Buah
A TENAGA
Pekerja OH 1.0000 1.000000 - - 1.000
B BAHAN
Pipa Listrik 5/8" btg 3.0000 - 6.000 - -
Kabel m 24.0000 - 48.000 - -
T Dus buah 3.0000 - 6.000 - -
L Bow buah 4.0000 - 8.000 - -
Las Dop buah 3.0000 - 6.000 - -
Klem buah 24.0000 - 48.000 - -
Mongkok buah 1.0000 - 2.000 - -
Saklar buah 1.0000 - 2.000 - -
Fitting buah 1.0000 - 2.000 - -
8 Pas. Lampu Tidur 4 Buah
A TENAGA
Pekerja OH 1.0000 1.000000 - - 1.000
B BAHAN
Pipa Listrik 5/8" btg 3.0000 - 12.000 - -
Kabel m 24.0000 - 96.000 - -

Tugas Besar Rencana Anggaran dan Biaya 223


Jumlah Kebutuhan
Total
No Uraian Pekerjaan Volume Satuan Koefisien
Tenaga Bahan Alat
Tenaga
T Dus buah 3.0000 - 12.000 - -
L Bow buah 4.0000 - 16.000 - -
Las Dop buah 3.0000 - 12.000 - -
Klem buah 24.0000 - 96.000 - -
Mongkok buah 1.0000 - 4.000 - -
Saklar buah 1.0000 - 4.000 - -
Fitting buah 1.0000 - 4.000 - -
9 Pas. Panel Pembagi ( M C B ) 1 Buah
A TENAGA
Pekerja OH 1.0000 1.000000 - - 1.000
B BAHAN
Pipa Listrik 5/8" btg 3.0000 - 3.000 - -
Kabel m 15.0000 - 15.000 - -
T Dus buah 1.0000 - 1.000 - -
L Bow buah 2.0000 - 2.000 - -
Klem buah 24.0000 - 24.000 - -
MCB buah 1.0000 - 1.000 - -
10 Pas. Wastafel 1 Buah
A TENAGA
Pekerja OH 1.2000 1.200000 - - 2.000
Tukang Batu OH 1.4500 1.450000 - - 2.000
Kepala Tukang OH 0.1500 0.150000 - - 1.000
Mandor OH 0.0600 0.060000 - - 1.000
B BAHAN
Wastafel Unit 1.2000 - 1.200 - -
Semen Portland Kg 6.0000 - 6.000 - -
Pasir Pasang m3 0.0100 - 0.010 - -
11 Pas. Closet Jongkok 1 Buah

Tugas Besar Rencana Anggaran dan Biaya 224


Jumlah Kebutuhan
Total
No Uraian Pekerjaan Volume Satuan Koefisien
Tenaga Bahan Alat
Tenaga
A TENAGA
Pekerja OH 1.0000 1.000000 - - 1.000
Tukang Batu OH 1.5000 1.500000 - - 2.000
Kepala Tukang OH 0.1500 0.150000 - - 1.000
Mandor OH 0.1600 0.160000 - - 1.000
B BAHAN
Closet Jongkok Unit 1.0000 - 1.000 - -
Semen Portland Kg 6.0000 - 6.000 - -
Pasir Pasang m3 0.0100 - 0.010 - -
12 Pas. Kran Air 3 Buah
A TENAGA
Pekerja OH 0.0100 0.030000 - - 1.000
Tukang Batu OH 0.4000 1.200000 - - 2.000
Kepala Tukang OH 0.0400 0.120000 - - 1.000
Mandor OH 0.0050 0.015000 - - 1.000
B BAHAN
Kran M 1.0000 - 3.000 - -
Sealtape Buah 6.0000 - 18.000 - -
13 Pas. Kitchen Zink 1 Buah
A TENAGA
Pekerja OH 0.0300 0.030000 - - 1.000
Tukang Batu OH 0.3000 0.300000 - - 1.000
Kepala Tukang OH 0.0300 0.030000 - - 1.000
Mandor OH 0.0150 0.015000 - - 1.000
B BAHAN
Bak Cuci Piring Unit 1.0000 - 1.000 - -
Waterdrain Buah 1.0000 - 1.000 - -
14 Pipa PVC, ∅4" 1 m'

Tugas Besar Rencana Anggaran dan Biaya 225


Jumlah Kebutuhan
Total
No Uraian Pekerjaan Volume Satuan Koefisien
Tenaga Bahan Alat
Tenaga
A TENAGA
Pekerja OH 0.0810 0.081000 - - 1.000
Tukang Batu OH 0.1350 0.135000 - - 1.000
Kepala Tukang OH 0.0135 0.013500 - - 1.000
Mandor OH 0.0040 0.004000 - - 1.000
B BAHAN
Pipa PVC 4" m' 1.2000 - 1.200 - -
15 Pipa PVC, ∅3" 1 m'
A TENAGA
Pekerja OH 0.0810 0.081000 - - 1.000
Tukang Batu OH 0.1350 0.135000 - - 1.000
Kepala Tukang OH 0.0135 0.013500 - - 1.000
Mandor OH 0.0040 0.004000 - - 1.000
B BAHAN
Pipa PVC 3" m' 1.2000 - 1.200 - -
16 Pipa PVC, ∅1" 1 m'
A TENAGA
Pekerja OH 0.0360 0.036000 - - 1.000
Tukang Batu OH 0.0600 0.060000 - - 1.000
Kepala Tukang OH 0.0060 0.006000 - - 1.000
Mandor OH 0.0020 0.002000 - - 1.000
B BAHAN
Pipa PVC 1" m' 1.2000 - 1.200 - -
17 Pipa Hawa, ∅1" 1 m'
A TENAGA
Pekerja OH 0.0360 0.036000 - - 1.000
Tukang Batu OH 0.0600 0.060000 - - 1.000
Kepala Tukang OH 0.0060 0.006000 - - 1.000
Mandor OH 0.0020 0.002000 - - 1.000

Tugas Besar Rencana Anggaran dan Biaya 226


Jumlah Kebutuhan
Total
No Uraian Pekerjaan Volume Satuan Koefisien
Tenaga Bahan Alat
Tenaga
B BAHAN
Pipa PVC 1" m' 1.2000 - 1.200 - -
18 Pas. Floor Drain 1 Buah
A TENAGA
Pekerja OH 0.0100 0.010000 - - 1.000
Tukang Batu OH 0.1000 0.100000 - - 1.000
Kepala Tukang OH 0.0100 0.010000 - - 1.000
Mandor OH 0.0050 0.005000 - - 1.000
B BAHAN
Floor Drain m' 1.0000 - 1.000 - -
19 Pas. Kabel Listrik 43.65 m
A TENAGA
Pekerja OH 1.0000 1.000000 - - 1.000
B BAHAN
Kabel Listrik m 1.0000 - 43.650 - -
IX Pekerjaan Finishing
1 Cat Tembok 1657.267 m2
A TENAGA
Pekerja OH 0.0200 33.145348 - - 34.000
Tukang Cat OH 0.0630 104.407846 - - 105.000
Kepala Tukang OH 0.0063 10.440785 - - 11.000
Mandor OH 0.0030 4.971802 - - 5.000
B BAHAN
Plamuur Kg 0.1000 - 165.727 - -
Cat Dasar Kg 0.1000 - 165.727 - -
Cat Penutup Kg 0.2600 - 430.890 - -
2 Cat Plafon 131.1 m2
A TENAGA

Tugas Besar Rencana Anggaran dan Biaya 227


Jumlah Kebutuhan
Total
No Uraian Pekerjaan Volume Satuan Koefisien
Tenaga Bahan Alat
Tenaga
Pekerja OH 0.0200 2.622000 - - 3.000
Tukang Cat OH 0.0630 8.259300 - - 9.000
Kepala Tukang OH 0.0063 0.825930 - - 1.000
Mandor OH 0.0030 0.393300 - - 1.000
B BAHAN
Plamuur Kg 0.1000 - 13.110 - -
Cat Dasar Kg 0.1000 - 13.110 - -
Cat Penutup Kg 0.2600 - 34.086 - -
3 Cat Kayu 1858.177 m2
A TENAGA
Pekerja OH 0.0700 130.072381 - - 131.000
Tukang Cat OH 0.0090 16.723592 - - 17.000
Kepala Tukang OH 0.0060 11.149061 - - 12.000
Mandor OH 0.0030 5.574531 - - 6.000
B BAHAN
Cat Menie kg 0.2000 - 371.635 - -
Plamuur kg 0.1500 - 278.727 - -
Cat Dasar kg 0.1700 - 315.890 - -
Cat Penutup kg 0.2600 - 483.126 - -
Kuas buah 0.0100 - 18.582 - -
Pengencer kg 0.0300 - 55.745 - -
Ampelas lbr 0.2000 - 371.635 - -
4 List Plafon 4.155 m2
A TENAGA
Pekerja OH 0.0700 0.290850 - - 1.000
Tukang Cat OH 0.0090 0.037395 - - 1.000
Kepala Tukang OH 0.0060 0.024930 - - 1.000
Mandor OH 0.0030 0.012465 - - 1.000

Tugas Besar Rencana Anggaran dan Biaya 228


Jumlah Kebutuhan
Total
No Uraian Pekerjaan Volume Satuan Koefisien
Tenaga Bahan Alat
Tenaga
B BAHAN
Cat Menie kg 0.2000 - 0.831 - -
Plamuur kg 0.1500 - 0.623 - -
Cat Dasar kg 0.1700 - 0.706 - -
Cat Penutup kg 0.2600 - 1.080 - -
Kuas buah 0.0100 - 0.042 - -
Pengencer kg 0.0300 - 0.125 - -
Ampelas lbr 0.2000 - 0.831 - -
5 Teac Oil 48 m2
A TENAGA
Pekerja OH 0.0400 1.920000 - - 2.000
Tukang Cat OH 0.0630 3.024000 - - 4.000
Kepala Tukang OH 0.0630 3.024000 - - 4.000
Mandor OH 0.0030 0.144000 - - 1.000
B BAHAN
Teac Oil Ltr 0.3600 - 17.280 - -
6 Cat Seng 35.8838 m2
A TENAGA
Pekerja OH 0.0200 0.717676 - - 1.000
Tukang Cat OH 0.2000 7.176760 - - 8.000
Kepala Tukang OH 0.0200 0.717676 - - 1.000
Mandor OH 0.0025 0.089710 - - 1.000
B BAHAN
Menie Besi kg 0.1000 - 3.588 - -
Kwas buah 0.0100 - 0.359 - -
X Pekerjaan Penggantung dan Pengunci
1 Pas. Kunci Double Slaag 7 Buah
A TENAGA

Tugas Besar Rencana Anggaran dan Biaya 229


Jumlah Kebutuhan
Total
No Uraian Pekerjaan Volume Satuan Koefisien
Tenaga Bahan Alat
Tenaga
Pekerja OH 0.0100 0.070000 - - 1.000
Tukang Kayu OH 0.5000 3.500000 - - 4.000
Kepala Tukang OH 0.0500 0.350000 - - 1.000
Mandor OH 0.0050 0.035000 - - 1.000
B BAHAN
Kunci Tanam Biasa Buah 1.0000 - 7.000 - -
2 Pas. Kunci KM/WC 1 Buah
A TENAGA
Pekerja OH 0.0050 0.005000 - - 1.000
Tukang Kayu OH 0.5000 0.500000 - - 1.000
Kepala Tukang OH 0.0500 0.050000 - - 1.000
Mandor OH 0.0030 0.003000 - - 1.000
B BAHAN
Kunci Tanam KM Buah 1.0000 - 1.000 - -
3 Pas. Grendel 16 Buah
A TENAGA
Pekerja OH 0.0050 0.080000 - - 1.000
Tukang Kayu OH 0.5000 8.000000 - - 8.000
Kepala Tukang OH 0.0500 0.800000 - - 1.000
Mandor OH 0.0030 0.048000 - - 1.000
B BAHAN
Grendel Buah 1.0000 - 16.000 - -
4 Pas. Engsel Pintu Kayu 21 Buah
A TENAGA
Pekerja OH 0.0150 0.315000 - - 1.000
Tukang Kayu OH 0.1500 3.150000 - - 4.000
Kepala Tukang OH 0.0150 0.315000 - - 1.000
Mandor OH 0.0008 0.016800 - - 1.000
B BAHAN

Tugas Besar Rencana Anggaran dan Biaya 230


Jumlah Kebutuhan
Total
No Uraian Pekerjaan Volume Satuan Koefisien
Tenaga Bahan Alat
Tenaga
Engsel Pintu Kayu Buah 1.0000 - 21.000 - -
5 Pas. Engsel Pintu Alumunium 2 Buah
A TENAGA
Pekerja OH 0.0150 0.030000 - - 1.000
Tukang Kayu OH 0.1500 0.300000 - - 1.000
Kepala Tukang OH 0.0150 0.030000 - - 1.000
Mandor OH 0.0008 0.001600 - - 1.000
B BAHAN
Engsel Pintu Stainlessteel Buah 1.0000 - 2.000 - -
6 Pas. Engsel Jendela 32 Buah
A TENAGA
Pekerja OH 0.0100 0.320000 - - 1.000
Tukang Kayu OH 0.1000 3.200000 - - 4.000
Kepala Tukang OH 0.0100 0.320000 - - 1.000
Mandor OH 0.0005 0.016000 - - 1.000
B BAHAN
Engsel Jendela Kupu - Kupu Buah 1.0000 - 32.000 - -
7 Pas. Kait Angin 32 Buah
A TENAGA
Pekerja OH 0.0150 0.480000 - - 1.000
Tukang Kayu OH 0.1500 4.800000 - - 5.000
Kepala Tukang OH 0.0150 0.480000 - - 1.000
Mandor OH 0.0080 0.256000 - - 1.000
B BAHAN
Kait Angin Buah 1.0000 - 32.000 - -
8 Pas. Door Stopper 1 Buah
A TENAGA
Pekerja OH 0.0100 0.010000 - - 1.000
Tukang Kayu OH 0.1000 0.100000 - - 1.000

Tugas Besar Rencana Anggaran dan Biaya 231


Jumlah Kebutuhan
Total
No Uraian Pekerjaan Volume Satuan Koefisien
Tenaga Bahan Alat
Tenaga
Kepala Tukang OH 0.0100 0.010000 - - 1.000
Mandor OH 0.0050 0.005000 - - 1.000
B BAHAN
Door Stop Buah 1.0000 - 1.000 - -
9 Pas. Mur , Baut dan Beugel 1 Ls
A TENAGA
Pekerja OH 1.0000 1.000000 - - 1.000
B BAHAN
Pas. Mur , Baut dan beugel Ls 1.0000 - 1.000 - -
XI Pekerjaan Septicktank dan Resapan
1 Galian Septicktank dan Resapan 7 m3
A TENAGA
Pekerja OH 0.9000 6.3 - - 7
Mandor OH 0.0450 0.315 - - 1
2 Urugan Tanah Kembali 2.333333 m3
A TENAGA
Pekerja OH 0.5000 1.16666667 - - 2
Mandor OH 0.0500 0.11666667 - - 1
3 Urugan Pasir Bidang Resapan 0.0525 m3
A TENAGA
Pekerja OH 0.3000 0.01575 - - 1
Mandor OH 0.0100 0.000525 - - 1
B BAHAN
Pasir Urug m3 1.2000 - 0.063 - -
4 Pas. Batu Kosong Bidang Resapan 0.42 m3
A TENAGA
Pekerja OH 0.7800 0.3276 - - 1
Tukang Batu OH 0.3900 0.1638 - - 1

Tugas Besar Rencana Anggaran dan Biaya 232


Jumlah Kebutuhan
Total
No Uraian Pekerjaan Volume Satuan Koefisien
Tenaga Bahan Alat
Tenaga
Kepala Tukang OH 0.0390 0.01638 - - 1
Mandor OH 0.0390 0.01638 - - 1
B BAHAN
Batu Belah m3 1.2000 - 0.504 - -
Pasir Urug m3 0.4320 - 0.181 - -
5 Pas. Batu Pecah Bidang Resapan 0.42 m 3

A TENAGA
Pekerja OH 0.7800 0.3276 - - 1
Tukang Batu OH 0.3900 0.1638 - - 1
Kepala Tukang OH 0.0390 0.01638 - - 1
Mandor OH 0.0390 0.01638 - - 1
B BAHAN
Batu Pecah m3 1.2000 - 0.504 - -
6 Pas. Kerikil Bidang Resapan 0.315 m 3

A TENAGA
Pekerja OH 0.7800 0.2457 - - 1
Tukang Batu OH 0.3900 0.12285 - - 1
Kepala Tukang OH 0.0390 0.012285 - - 1
Mandor OH 0.0390 0.012285 - - 1
B BAHAN
Kerikil m3 0.4680 - 0.147 - -
7 Pas. Batu Karang Bidang Resapan 0.5244 m 3

A TENAGA
Pekerja OH 0.7800 0.409032 - - 1
Tukang Batu OH 0.3900 0.204516 - - 1
Kepala Tukang OH 0.0390 0.0204516 - - 1
Mandor OH 0.0390 0.0204516 - - 1

Tugas Besar Rencana Anggaran dan Biaya 233


Jumlah Kebutuhan
Total
No Uraian Pekerjaan Volume Satuan Koefisien
Tenaga Bahan Alat
Tenaga
B BAHAN
Batu Karang m3 0.4500 - 0.236 - -
8 Cor Rabat Beton 0.4675 m3
A TENAGA
Pekerja OH 5.3000 2.47775 - - 3.000
Tukang Batu OH 0.2750 0.1285625 - - 1.000
Tukang Kayu OH 1.3000 0.60775 - - 1.000
Tukang Besi OH 1.0500 0.490875 - - 1.000
Kepala Tukang OH 0.2650 0.1238875 - - 1.000
Mandor OH 0.2650 0.1238875 - - 1.000
B BAHAN
Kayu Kelas III m3 0.3200 - 0.150 - -
Kayu Kelas II Balok m3 0.1200 - 0.056 - -
Paku 5- 12 cm kg 3.2000 - 1.496 - -
Minyak Bekisting Liter 1.6000 - 0.748 - -
Besi Beton Polos kg 157.5000 - 73.631 - -
Kawat Beton kg 2.2500 - 1.052 - -
Semen Portland kg 336.0000 - 157.080 - -
Pasir Beton m3 0.5400 - 0.252 - -
Kerikil m3 0.8100 - 0.379 - -
Plywood 9 mm lbr 2.8000 - 1.309 - -
Dolken Kayu btg 32.0000 - 14.960 - -
9 Cor Plat Beton Septicktank 0.4 m3
A TENAGA
Pekerja OH 5.3000 2.12 - - 3.000
Tukang Batu OH 0.2750 0.11 - - 1.000
Tukang Kayu OH 1.3000 0.52 - - 1.000

Tugas Besar Rencana Anggaran dan Biaya 234


Jumlah Kebutuhan
Total
No Uraian Pekerjaan Volume Satuan Koefisien
Tenaga Bahan Alat
Tenaga
Tukang Besi OH 1.0500 0.42 - - 1.000
Kepala Tukang OH 0.2650 0.106 - - 1.000
Mandor OH 0.2650 0.106 - - 1.000
B BAHAN
Kayu Kelas III m3 0.3200 - 0.128 - -
Kayu Kelas II Balok m3 0.1200 - 0.048 - -
Paku 5- 12 cm kg 3.2000 - 1.280 - -
Minyak Bekisting Liter 1.6000 - 0.640 - -
Besi Beton Polos kg 157.5000 - 63.000 - -
Kawat Beton kg 2.2500 - 0.900 - -
Semen Portland kg 336.0000 - 134.400 - -
Pasir Beton m3 0.5400 - 0.216 - -
Kerikil m3 0.8100 - 0.324 - -
Plywood 9 mm lbr 2.8000 - 1.120 - -
Dolken Kayu btg 32.0000 - 12.800 - -
10 Cor Plat Beton Resapan 0.3 m3
A TENAGA
Pekerja OH 5.3000 1.59 - - 2.000
Tukang Batu OH 0.2750 0.0825 - - 1.000
Tukang Kayu OH 1.3000 0.39 - - 1.000
Tukang Besi OH 1.0500 0.315 - - 1.000
Kepala Tukang OH 0.2650 0.0795 - - 1.000
Mandor OH 0.2650 0.0795 - - 1.000
B BAHAN
Kayu Kelas III m3 0.3200 - 0.096 - -
Kayu Kelas II Balok m3 0.1200 - 0.036 - -
Paku 5- 12 cm kg 3.2000 - 0.960 - -

Tugas Besar Rencana Anggaran dan Biaya 235


Jumlah Kebutuhan
Total
No Uraian Pekerjaan Volume Satuan Koefisien
Tenaga Bahan Alat
Tenaga
Minyak Bekisting Liter 1.6000 - 0.480 - -
Besi Beton Polos kg 157.5000 - 47.250 - -
Kawat Beton kg 2.2500 - 0.675 - -
Semen Portland kg 336.0000 - 100.800 - -
Pasir Beton m3 0.5400 - 0.162 - -
Kerikil m3 0.8100 - 0.243 - -
Plywood 9 mm lbr 2.8000 - 0.840 - -
Dolken Kayu btg 32.0000 - 9.600 - -
11 Cor Kolom Praktis 0.5292 m3
A TENAGA
Pekerja OH 5.3000 2.80476 - - 3.000
Tukang Batu OH 0.2750 0.14553 - - 1.000
Tukang Kayu OH 1.3000 0.68796 - - 1.000
Tukang Besi OH 1.5000 0.7938 - - 1.000
Kepala Tukang OH 0.2650 0.140238 - - 1.000
Mandor OH 0.2650 0.140238 - - 1.000
B BAHAN
Kayu Balok Kelas II m3 0.1200 - 0.063504 - -
Kayu Kelas III m3 0.3200 - 0.169344 - -
Paku 5- 12 cm Kg 3.2000 - 1.69344 - -
Minyak Bekisting Liter 1.6000 - 0.84672 - -
Besi Beton Polos Kg 157.5000 - 83.349 - -
Kawat Beton Kg 2.2500 - 1.1907 - -
Semen Portland Kg 336.0000 - 177.8112 - -
Pasir Beton m3 0.5400 - 0.285768 - -
Kerikil m3 0.8100 - 0.428652 - -
Dolken Kayu btg 3.2000 - 1.69344 - -

Tugas Besar Rencana Anggaran dan Biaya 236


Jumlah Kebutuhan
Total
No Uraian Pekerjaan Volume Satuan Koefisien
Tenaga Bahan Alat
Tenaga
Plywood 9 mm lbr 2.8000 - 1.48176 - -
12 Pek. Pasangan Tembok Biasa ( Resapan ) 8 m2
A TENAGA
Pekerja OH 0.6000 4.8 - - 5.000
Tukang Batu OH 0.2000 1.6 - - 2.000
Kepala Tukang OH 0.0200 0.16 - - 1.000
Mandor OH 0.0300 0.24 - - 1.000
B BAHAN
Bata Merah Buah 140.0000 - 1120 - -
Semen Portland Kg 22.2000 - 177.6 - -
Pasir Pasang m3 0.1020 - 0.816 - -
13 Pek. Plesteran Tembok Biasa ( Resapan ) 16 m2
A TENAGA
Pekerja OH 0.4000 6.4 - - 7.000
Tukang Batu OH 0.2000 3.2 - - 4.000
Kepala Tukang OH 0.0200 0.32 - - 1.000
Mandor OH 0.0220 0.352 - - 1.000
B BAHAN
Semen Portland Kg 6.9120 - 110.592 - -
Pasir Pasang m3 0.0350 - 0.56 - -
14 Pek. Pasangan Tembok Trasram ( ST ) 9.6 m2
A TENAGA
Pekerja OH 0.6000 5.76 - - 6.000
Tukang Batu OH 0.2000 1.92 - - 2.000
Kepala Tukang OH 0.0200 0.192 - - 1.000
Mandor OH 0.0300 0.288 - - 1.000
B BAHAN
Bata Merah Buah 140.0000 - 1344 - -

Tugas Besar Rencana Anggaran dan Biaya 237


Jumlah Kebutuhan
Total
No Uraian Pekerjaan Volume Satuan Koefisien
Tenaga Bahan Alat
Tenaga
Semen Portland Kg 32.9500 - 316.32 - -
Pasir Pasang m3 0.0910 - 0.8736 - -
15 Pek. Plesteran Tembok Trasram ( ST ) 19.2 m2
A TENAGA
Pekerja OH 0.2600 4.992 - - 5.000
Tukang Batu OH 0.2000 3.84 - - 4.000
Kepala Tukang OH 0.0200 0.384 - - 1.000
Mandor OH 0.0130 0.2496 - - 1.000
B BAHAN
Semen Portland Kg 10.3680 - 199.0656 - -
Pasir Pasang m3 0.0310 - 0.5952 - -
XII Pekerjaan Besi
1 Pemasangan Gerbang Partisi Besi Hollow 7.3775 m2
A TENAGA
Pekerja OH 0.2500 1.844375 - - 2.000
Tukang Besi OH 0.2500 1.844375 - - 2.000
Kepala Tukang OH 0.0250 0.1844375 - - 1.000
Mandor OH 0.0130 0.0959075 - - 1.000
B BAHAN
Rangka Besi Hollow 40.40 mm m' 3.5000 - 25.82125 - -
Assesoris ( Perkuatan,las) Ls 1.0000 - 7.3775 - -
XIII Pekerjaan Lain - Lain
1 Pembersihan Kembali 1 Ls
A TENAGA
Pekerja OH 0.1000 0.1 - - 1
Mandor OH 0.0500 0.05 - - 1

Tugas Besar Rencana Anggaran dan Biaya 238


Total
Satuan
Material Alat

- - OH
- - OH

- - OH
- - OH
- - OH
- - OH

5.4 - m3
0.9 - Kg
0.315 - m3

- - OH
- - OH

- - OH

Tugas Besar Rencana Anggaran dan Biaya 239


Total
Satuan
Material Alat
- - OH

- - OH
- - OH

- - OH
- - OH

0 - m3

- - OH
- - OH

14.1675 - m3

- - OH
- - OH
- - OH
- - OH

43.014 - m3
15.48504 - m3

Tugas Besar Rencana Anggaran dan Biaya 240


Total
Satuan
Material Alat

- - OH
- - OH
- - OH
- - OH

47.187 - m3
16.98732 - m3

- - OH
- - OH
- - OH
- - OH

25012.68 - Buah
5886.9129 - Kg
16.258242 - m3

- - OH
- - OH
- - OH
- - OH

61090.414 - Buah

Tugas Besar Rencana Anggaran dan Biaya 241


Total
Satuan
Material Alat
9687.1942 - Kg
44.50873 - m3

- - OH
- - OH
- - OH
- - OH

3704.7352 - Kg
11.077044 - m3

- - OH
- - OH
- - OH
- - OH

5727.5161 - Kg
29.00218 - m3

- - OH
- - OH
- - OH
- - OH

Tugas Besar Rencana Anggaran dan Biaya 242


Total
Satuan
Material Alat
0 - Kg
0 - m3

- - OH
- - OH
- - OH
- - OH

5386.1191 - Kg

- - OH
- - OH
- - OH
- - OH
- - OH
- - OH

0 - m3
0 - Kg
0 - Liter
0 - Kg
0 - Kg
0 - Kg
0 - m3

Tugas Besar Rencana Anggaran dan Biaya 243


Total
Satuan
Material Alat
0 - m3

- - OH
- - OH
- - OH
- - OH
- - OH
- - OH

0.7107 - m3
1.8952 - m3
18.952 - Kg
9.476 - Liter
932.79375 - Kg
13.325625 - Kg
1989.96 - Kg
3.19815 - m3
4.797225 - m3
18.952 - btg
16.583 - lbr

- - OH
- - OH
- - OH
- - OH

Tugas Besar Rencana Anggaran dan Biaya 244


Total
Satuan
Material Alat
- - OH
- - OH

0.8928 - m3
8.928 - Kg
4.464 - Liter
585.9 - Kg
8.37 - Kg
937.44 - Kg
1.5066 - m3
2.2599 - m3
0.3906 - m3
7.812 - lbr
44.64 - btg

- - OH
- - OH
- - OH
- - OH
- - OH
- - OH

0.097 - m3
0.971 - Kg
0.485 - Liter
63.693 - Kg

Tugas Besar Rencana Anggaran dan Biaya 245


Total
Satuan
Material Alat
0.910 - Kg
101.909 - Kg
0.164 - m3
0.246 - m3
0.042 - m3
0.849 - lbr
4.853 - btg

- - OH
- - OH
- - OH
- - OH
- - OH
- - OH

1.008 - m3
0.378 - m3
10.080 - kg
5.040 - Liter
496.125 - kg
7.088 - kg
1058.400 - kg
1.701 - m3
2.552 - m3
8.820 - lbr
100.800 - btg

Tugas Besar Rencana Anggaran dan Biaya 246


Total
Satuan
Material Alat

- - OH
- - OH
- - OH
- - OH
- - OH
- - OH

0.171 - m3
0.064 - m3
1.712 - kg
0.856 - Liter
84.263 - kg
1.204 - kg
179.760 - kg
0.289 - m3
0.433 - m3
1.498 - lbr
17.120 - btg

- - OH
- - OH
- - OH
- - OH
- - OH

Tugas Besar Rencana Anggaran dan Biaya 247


Total
Satuan
Material Alat
- - OH

0.139 - m3
0.052 - m3
1.392 - kg
0.696 - Liter
68.513 - kg
0.979 - kg
146.160 - kg
0.235 - m3
0.352 - m3
1.218 - lbr
13.920 - btg

- - OH
- - OH
- - OH
- - OH
- - OH
- - OH

0.000 - m3
0.000 - m3
0.000 - kg
0.000 - Liter
0.000 - kg

Tugas Besar Rencana Anggaran dan Biaya 248


Total
Satuan
Material Alat
0.000 - kg
0.000 - kg
0.000 - m3
0.000 - m3
0.000 - lbr
0.000 - btg

- - OH
- - OH
- - OH
- - OH

0.239 - m3
0.271 - Kg
0.217 - Kg

- - OH
- - OH
- - OH
- - OH

0.040 - m'
0.072 - Buah
0.002 - Tube

Tugas Besar Rencana Anggaran dan Biaya 249


Total
Satuan
Material Alat

- - OH
- - OH
- - OH
- - OH

0.600 - m3
0.720 - Kg
12.000 - Kg
24.000 - lbr

- - OH
- - OH
- - OH
- - OH

0.593 - m2
0.027 - Kg

- - OH
- - OH
- - OH
- - OH

Tugas Besar Rencana Anggaran dan Biaya 250


Total
Satuan
Material Alat
1.907 - m3
26.004 - Kg
5.201 - Kg

- - OH
- - OH
- - OH
- - OH

1.845 - m3
17.083 - Kg

- - OH
- - OH
- - OH
- - OH

-0.911 - m3
-12.427 - Kg
-4.640 - Kg

- - OH
- - OH
- - OH

Tugas Besar Rencana Anggaran dan Biaya 251


Total
Satuan
Material Alat
- - OH

9.221 - Lbr
0.263 - Kg

- - OH
- - OH
- - OH
- - OH

1.164 - Lbr
1.552 - Kg

- - OH
- - OH
- - OH
- - OH

1.835 - m3
26.220 - Kg

- - OH
- - OH
- - OH
- - OH

Tugas Besar Rencana Anggaran dan Biaya 252


Total
Satuan
Material Alat

49.163 - Lbr
3.933 - Kg

- - OH
- - OH
- - OH
- - OH

145.425 - m'
1.385 - Kg

- - OH
- - OH
- - OH
- - OH

81.880 - Dos
890.000 - Kg
4.005 - m3
44.500 - Kg

- - OH
- - OH

Tugas Besar Rencana Anggaran dan Biaya 253


Total
Satuan
Material Alat
- - OH
- - OH

5.513 - Dos
52.500 - Kg
0.236 - m3
2.625 - Kg

- - OH
- - OH
- - OH
- - OH

35.610 - Dos
42.450 - Kg
0.117 - m3
6.000 - Kg

- - OH
- - OH
- - OH
- - OH

14031.220 - Buah
2462.082 - Kg
4.765 - m3

Tugas Besar Rencana Anggaran dan Biaya 254


Total
Satuan
Material Alat
728.035 - Kg

- - OH
- - OH
- - OH
- - OH

300.298 - Buah
64.592 - Kg
0.170 - m3
1.417 - Kg

- - OH

9.000 - Buah

- - OH

3.000 - Buah

- - OH

9.000 - Buah

Tugas Besar Rencana Anggaran dan Biaya 255


Total
Satuan
Material Alat

- - OH

12.000 - btg
96.000 - m
12.000 - buah
16.000 - buah
12.000 - buah
96.000 - buah
4.000 - buah
4.000 - buah
4.000 - buah

- - OH

18.000 - btg
144.000 - m
18.000 - buah
24.000 - buah
18.000 - buah
144.000 - buah
6.000 - buah
6.000 - buah
6.000 - buah

- - OH

Tugas Besar Rencana Anggaran dan Biaya 256


Total
Satuan
Material Alat

3.000 - btg
24.000 - m
3.000 - buah
4.000 - buah
3.000 - buah
24.000 - buah
1.000 - buah
1.000 - buah
1.000 - buah

- - OH

6.000 - btg
48.000 - m
6.000 - buah
8.000 - buah
6.000 - buah
48.000 - buah
2.000 - buah
2.000 - buah
2.000 - buah

- - OH

12.000 - btg
96.000 - m

Tugas Besar Rencana Anggaran dan Biaya 257


Total
Satuan
Material Alat
12.000 - buah
16.000 - buah
12.000 - buah
96.000 - buah
4.000 - buah
4.000 - buah
4.000 - buah

- - OH

3.000 - btg
15.000 - m
1.000 - buah
2.000 - buah
24.000 - buah
1.000 - buah

- - OH
- - OH
- - OH
- - OH

1.200 - Unit
6.000 - Kg
0.010 - m3

Tugas Besar Rencana Anggaran dan Biaya 258


Total
Satuan
Material Alat

- - OH
- - OH
- - OH
- - OH

1.000 - Unit
6.000 - Kg
0.010 - m3

- - OH
- - OH
- - OH
- - OH

3.000 - M
18.000 - Buah

- - OH
- - OH
- - OH
- - OH

1.000 - Unit
1.000 - Buah

Tugas Besar Rencana Anggaran dan Biaya 259


Total
Satuan
Material Alat

- - OH
- - OH
- - OH
- - OH

1.200 - m'

- - OH
- - OH
- - OH
- - OH

1.200 - m'

- - OH
- - OH
- - OH
- - OH

1.200 - m'

- - OH
- - OH
- - OH
- - OH

Tugas Besar Rencana Anggaran dan Biaya 260


Total
Satuan
Material Alat

1.200 - m'

- - OH
- - OH
- - OH
- - OH

1.000 - m'

- - OH

43.650 - m

- - OH
- - OH
- - OH
- - OH

165.727 - Kg
165.727 - Kg
430.890 - Kg

Tugas Besar Rencana Anggaran dan Biaya 261


Total
Satuan
Material Alat
- - OH
- - OH
- - OH
- - OH

13.110 - Kg
13.110 - Kg
34.086 - Kg

- - OH
- - OH
- - OH
- - OH

371.635 - kg
278.727 - kg
315.890 - kg
483.126 - kg
18.582 - buah
55.745 - kg
371.635 - lbr

- - OH
- - OH
- - OH
- - OH

Tugas Besar Rencana Anggaran dan Biaya 262


Total
Satuan
Material Alat

0.831 - kg
0.623 - kg
0.706 - kg
1.080 - kg
0.042 - buah
0.125 - kg
0.831 - lbr

- - OH
- - OH
- - OH
- - OH

17.280 - Ltr

- - OH
- - OH
- - OH
- - OH

3.588 - kg
0.359 - buah

Tugas Besar Rencana Anggaran dan Biaya 263


Total
Satuan
Material Alat
- - OH
- - OH
- - OH
- - OH

7.000 - Buah

- - OH
- - OH
- - OH
- - OH

1.000 - Buah

- - OH
- - OH
- - OH
- - OH

16.000 - Buah

- - OH
- - OH
- - OH
- - OH

Tugas Besar Rencana Anggaran dan Biaya 264


Total
Satuan
Material Alat
21.000 - Buah

- - OH
- - OH
- - OH
- - OH

2.000 - Buah

- - OH
- - OH
- - OH
- - OH

32.000 - Buah

- - OH
- - OH
- - OH
- - OH

32.000 - Buah

- - OH
- - OH

Tugas Besar Rencana Anggaran dan Biaya 265


Total
Satuan
Material Alat
- - OH
- - OH

1.000 - Buah

- - OH

1.000 - Ls

- - OH
- - OH

- - OH
- - OH

- - OH
- - OH

0.063 - m3

- - OH
- - OH

Tugas Besar Rencana Anggaran dan Biaya 266


Total
Satuan
Material Alat
- - OH
- - OH

0.504 - m3
0.181 - m3

- - OH
- - OH
- - OH
- - OH

0.504 - m3

- - OH
- - OH
- - OH
- - OH

0.147 - m3

- - OH
- - OH
- - OH
- - OH

Tugas Besar Rencana Anggaran dan Biaya 267


Total
Satuan
Material Alat

0.236 - m3

- - OH
- - OH
- - OH
- - OH
- - OH
- - OH

0.150 - m3
0.056 - m3
1.496 - kg
0.748 - Liter
73.631 - kg
1.052 - kg
157.080 - kg
0.252 - m3
0.379 - m3
1.309 - lbr
14.960 - btg

- - OH
- - OH
- - OH

Tugas Besar Rencana Anggaran dan Biaya 268


Total
Satuan
Material Alat
- - OH
- - OH
- - OH

0.128 - m3
0.048 - m3
1.280 - kg
0.640 - Liter
63.000 - kg
0.900 - kg
134.400 - kg
0.216 - m3
0.324 - m3
1.120 - lbr
12.800 - btg

- - OH
- - OH
- - OH
- - OH
- - OH
- - OH

0.096 - m3
0.036 - m3
0.960 - kg

Tugas Besar Rencana Anggaran dan Biaya 269


Total
Satuan
Material Alat
0.480 - Liter
47.250 - kg
0.675 - kg
100.800 - kg
0.162 - m3
0.243 - m3
0.840 - lbr
9.600 - btg

- - OH
- - OH
- - OH
- - OH
- - OH
- - OH

0.063504 - m3
0.169344 - m3
1.69344 - Kg
0.84672 - Liter
83.349 - Kg
1.1907 - Kg
177.8112 - Kg
0.285768 - m3
0.428652 - m3
1.69344 - btg

Tugas Besar Rencana Anggaran dan Biaya 270


Total
Satuan
Material Alat
1.48176 - lbr

- - OH
- - OH
- - OH
- - OH

1120 - Buah
177.6 - Kg
0.816 - m3

- - OH
- - OH
- - OH
- - OH

110.592 - Kg
0.56 - m3

- - OH
- - OH
- - OH
- - OH

1344 - Buah

Tugas Besar Rencana Anggaran dan Biaya 271


Total
Satuan
Material Alat
316.32 - Kg
0.8736 - m3

- - OH
- - OH
- - OH
- - OH

199.0656 - Kg
0.5952 - m3

- - OH
- - OH
- - OH
- - OH

25.82125 - m'
7.3775 - Ls

- - OH
- - OH

Tugas Besar Rencana Anggaran dan Biaya 272


REKAPITULASI KEBUTUHAN BAHAN

Volume
No Bahan Volume SATUAN
Yang Dipakai
1 Ampelas 184 Lbr 184
2 Batu Bata Kecil 5 x 11 x 22 54267 Buah 54267
3 Batu Karang/Belah 87.81 m3 87.81
4 Batu Kerikil Kali Bulat 1/3 & 2/3 17.44 m3 17.44
5 Batu Pecah 1/2 & 2/3 0.504 m3 0.504
6 Besi Beton Polos/Ulir 3742.77 Kg 3742.77
7 Besi Beugel/Plat Strip/Angkur Baut 39.38 Kg 39.38
8 Besi Hollow 40x40 mm 25.82 m 4
9 Cat Menie/Kayu ( Altex ) 184.30696 Kg 37
10 Cat Kayu/Besi Kilap ( Avian ) 396.259964 Kg 80
11 Cat Tembok/Plafon ( Matex ) 309.176064 Kg 62
12 Door Stop 1 Buah 1
13 Closet Jongkok Ex INS 1 Unit 1
14 Engsel Jendela Kupu - Kupu 32 Buah 32
15 Engsel Pintu Tempel 21 Buah 21
16 Egsel Pintu Stainless Steel 2 Buah 2
17 Floor Drain 1 Buah 1
18 Grendel Jendela 16 Buah 16
19 Kait Angin 32 Buah 32
20 Kayu Balok Kelas I ( Jati ) 1.66 m3 1.66
21 Kayu Dolken Bulat 314.06 Btg 314.06
22 Kayu Balok Kelas II 0.77 m3 0.77
23 Kayu Papan Kelas II ( Meranti ) 0.58 m3 0.58
24 Kayu Usuk Kelas II ( Meranti ) 9.96 m 3
9.96
25 Kayu Usuk/Papan Bekisting Kelas III (Lokal) 1.84 m3 1.84
26 Kran Air Stainlessteel 1/2" 3 Buah 3
27 Kuas Cat 4" 11 Buah 11
28 Kunci Pintu Double Slaag 7 Buah 7
29 Kunci Pintu KM/WC 1 Buah 1
30 Kusen Alumunium Alexindo 1 m' 1
31 Kaca Polos( 5 mm ) 9.02 m2 9.02
32 Kawat Ikat Beton 53.47 Kg 53.47
33 Klem 432 Buah 432
34 L Bow 70 Buah 70
35 Las Dop 51 Buah 51
36 Lenka Fitting Lampu Rossi 17 Buah 17
37 Lem Aica Aibon ( Sealent ) 0.41 Kg 0.41
38 Lem Kaca ( Sealent ) 0.0022 Tube 0.0022
39 Lem Wiber 1.03 Kg 1.03

Tugas Besar Rencana Anggaran dan Biaya 275


Volume
No Bahan Volume SATUAN
Yang Dipakai
40 List Kayu Profil 145.43 m' 145.43
41 MCB 1 Buah 1.00
42 Minyak Cat/Tiner 27.65 Ltr 27.65
43 Minyak Bekisting 29.93 Ltr 29.93
44 Mongkok Listrik 17 Buah 17.00
45 Paku 890.31 Kg 890.31
46 Pasir Beton 11.53 m3 2.31
47 Pasir Pasang 68.07 m3 13.61
48 Pasir Urug 63.20 m3 12.64
49 Pipa Listrik 5/8" 54 Btg 54
50 Pipa PVC Tipe AW ᴓ4" 1.2 m' 1.20
51 Pipa PVC Tipe AW ᴓ3" 1.2 m' 1.20
52 Pipa PVC Tipe AW ᴓ1" 2.4 m' 2.40
53 Plamuur Kayu/Dempul 138.23022 Kg 138.23
54 Plamuur Tembok 85.88 Kg 85.88
55 Plint Keramik 300.298 Buah 300.30
56 Plywood 9 mm 47.943 Lbr 48
57 Politur/Teac Oil 0.59 Ltr 0.59
58 Porselin 1046 Buah 1046
59 Pasangan Wastafel Keramik Lengkap 1 Unit 1
60 Saklar Tunggal 9 Buah 9
61 Saklar Ganda 3 Buah 3
62 Seal Tape Onda 18 Buah 18
63 Semen Portland ( PC ) 28188.5039 Kg 705
64 Semen Warna 108.8265 Kg 108.83
65 Seng Gelombang BJLS 0.3 61 Lbr 61
66 Seng Pelat BJLS 0.3 4 Lbr 4
67 Stop Kontak 9 Buah 9
68 T Dus 52 Buah 52
69 Tegel Keramik 30/30 Polos 6 Dos 6
70 Tegel Keramik 30/30 Mozaik 36 Dos 36
71 Tegel Keramik 60/60 Polos 82 Dos 82
72 Tripleks Tebal 4 mm 49.981 Lbr 50
73 Wastafel Cuci Piring IKEA ( 1 Bak Cuci + Pengering ) 1 Unit 1

Tugas Besar Rencana Anggaran dan Biaya 276


TULASI KEBUTUHAN BAHAN

SATUAN KET.

Lbr
Buah
m3
m3
m3
Kg
Kg
Btg @6m
Kaleng @ 5 Kg
Kaleng @ 5 Kg
Kaleng @ 5 Kg
Buah
Unit
Buah
Buah
Buah
Buah
Buah
Buah
m3
Buah
m3
m3
m3
m3
Buah
Buah
Buah
Buah
m'
m2
Kg
Buah
Buah
Buah
Buah
Kg
Tube
Kg

Tugas Besar Rencana Anggaran dan Biaya 277


SATUAN KET.

m'
Buah
Ltr
Ltr
Buah
Kg
Ret @ Ret 5 m3
Ret @ Ret 5 m3
Ret @ Ret 5 m3
Btg
m'
m'
m'
Kg
Kg
Buah
Lbr
Ltr
Buah
Unit
Buah
Buah
Buah
Zak @ 40 Kg
Kg
Lbr
Lbr
Buah
Buah
Dos
Dos
Dos
Lbr
Unit

Tugas Besar Rencana Anggaran dan Biaya 278


REKAPITULASI KEBUTUHAN TENAGA KERJA

JUMLAH
No TENAGA KERJA KEBUTUHAN SATUAN
TENAGA KERJA
1 Mandor 154 ORG
2 Kepala tukang 125 ORG
3 Tukang batu 421 ORG
4 Tukang besi 35 ORG
5 Tukang cat 93 ORG
6 Tukang kayu 213 ORG
7 Tukang listrik 12 ORG
8 Pekerja 1296 ORG

Tugas Besar Rencana Anggaran dan Biaya 279