Anda di halaman 1dari 3

Pekerjaan : Rehabilitasi Gedung VIP

lokasi : Kota Kendari


Tahun Anggaran : 2018

BU
NO URAIAN JUMLAH HARGA BOBOT (%) OKTOBER NOV
1 2 1
A PEKERJAAN ARCHITECTUR 38,407,726.30
B PEKERJAAN LANTAI 40,588,831.88
C PEK. PINTU DAN JENDELA 11,729,814.15
D PEK. SANITASI 525,000.00
E PEK TAMPAK LUAR 6,584,746.78
F PEK. ATAP 7,433,863.27
G PEK. PLAFOND 12,031,001.92
A REAL COST (A) 117,300,984.30
B PPN 10 X (A)(B) 1,173,009,843
C JUMLAH (A+B) 1,290,310,827.30
D DIBULATKAN
BULAN
NOVEMBER DESEMBER KET
2 3 4 5 6 7 8
BANGSAT KAO

Anda mungkin juga menyukai