Perhitungan Headstock
Perhitungan Headstock
62
11.55 50,000.00
1,000,000,000.00
0.59 1.47
0.10
0.49 1.22
4.31 10.78
4.31 10.78
0.85
13.20
22,500.00
252,450.00
Cek beton headstock
30 cm
14
0
c
m
- Luasan tumpuan
A1 = 1,400 x 300
= 420,000 mm2
= 12.89 Ton
Total Berat
sisi kanan
Vu = 9.21 Ton/m
Vu = 9.21 Ton ------> N 92,071.43 N
Bu = 92,071.43 < 6,247,500.00 Ok