Anda di halaman 1dari 5

4.

62
11.55 50,000.00
1,000,000,000.00

0.59 1.47
0.10

0.49 1.22

4.31 10.78

4.31 10.78

0.85
13.20
22,500.00

252,450.00
Cek beton headstock

30 cm

14
0
c
m

- Luasan tumpuan
A1 = 1,400 x 300
= 420,000 mm2

- Kekuatan nominal tumpuan


Bn = 0.85 x Fc x A1
= 0.85 x 17.5 x 420,000
= 6,247,500.00 N

- Beban tumpuan terfaktor (per-m')


W pilecap.1 = 5.39 Ton
W pilecap.2 = 5.39 Ton
W Halfslab = 1.25 Ton ------> u/. Sisi kanan 7.5 Ton

= 12.89 Ton
Total Berat
sisi kanan
Vu = 9.21 Ton/m
Vu = 9.21 Ton ------> N 92,071.43 N
Bu = 92,071.43 < 6,247,500.00 Ok

- Cek Tegangan Tumpu


σc < 0.3 Fc = 0.3 x 17.5
= 5.25 Mpa
Tegangan Tumpu
σ = Bu
A1
= 92,071.43 = 0.2192
420,000
0.219 < 5.25 …........... Ok

- Cek Tegangan Geser Pada Tumpuan


Tegangan geser izin beton tanpa tulangan
σp = 0.65 𝑥 √𝐹𝑐′
σp = 2.72 MPa
Tegangan geser pada tumpuan
v = Vu
Ageser
= 92,071.43 Ageser
1,400 x 300 √2

= 0.155 Mpa < σp Ok

500 N/mm2 Mpa


50
490.625
24531.25 Ton
300 mm
300 2^0.5

Anda mungkin juga menyukai