Anda di halaman 1dari 387

ANALISIS STANDAR BELANJA

(ASB)
PEMERINTAH KOTA
MOJOKERTO

TAHUN ANGGARAN
2019
DAFTAR ISI

PERWALI NO.47 TAHUN 2018


HSPK ........................................................................................ 1
2.01. HSPK FISIK KONSTRUKSI .................................................................................................1
2.01.01. BANGUNAN GEDUNG ....................................................................................................1
2.01.01.01.Pekerjaan Persiapan dan Tanah .............................................................................. 1
2.01.01.02.Pekerjaan Pondasi .................................................................................................... 12
2.01.01.03.Struktur Utama......................................................................................................... 16
2.01.01.04.Pekerjaan Pasangan Dinding dan Plesteran ........................................................... 33
2.01.01.05.Pekerjaan Penutup Lantai dan Dinding................................................................... 43
2.01.01.06.Pekerjaan Kayu ......................................................................................................... 53
2.01.01.07.Pekerjaan Finishing .................................................................................................. 74
2.01.02. PEKERJAAN JALAN DAN IRIGASI .....................................................................................124
2.01.02.01.Paving dan Perkerasan Jalan ................................................................................... 124
2.01.02.02.Pekerjaan Pengairan ................................................................................................ 171
2.02. HSPK FISIK NON KONSTRUKSI.........................................................................................191
2.02.03. SARANA DAN PRASARANA KOTA ....................................................................................191
2.02.03.01.Penerangan Jalan Umum ......................................................................................... 191
2.02.03.02.Sarana Lalu Lintas..................................................................................................... 222
2.02.03.03.Taman dan Kebersihan ............................................................................................ 239
2.02.04. PERAWATAN KENDARAAN .............................................................................................254
2.02.04.01.Service Kendaraan.................................................................................................... 256

ASB FISIK .................................................................................. 260


3.01. ASB FISIK ........................................................................................................................260
3.01.01. PEMBANGUNAN GEDUNG NEGARA,RUMAH NEGARA & PAGAR ....................................260
3.01.01.01.Pembangunan Gedung Negara ............................................................................... 260
3.01.02.04.Non Konstruksi ......................................................................................................... 265
REKAP ASB NON FISIK ................................................................. 268
RINCIAN ASB NON FISIK ............................................................... 270
3.02. ASB NON FISIK................................................................................................................270
3.02.01. ANALISIS STANDAR BELANJA KEGIATAN NON FISIK ........................................................270
3.02.01.01.Kegiatan Perencanaan ............................................................................................. 270
3.02.01.01.01.Penelitian/Kajian ........................................................................................... 270
3.02.01.01.02.Penyusunan Rumusan Kebijakan ................................................................. 271
3.02.01.02.Kegiatan Pelaksanaan .............................................................................................. 273
3.02.01.02.01.Sosialisasi/Penyuluhan ................................................................................. 273
3.02.01.02.02.Pelatihan/Bimtek/Workshop ....................................................................... 277
3.02.01.02.03.Pagelaran/Festival/Pawai ............................................................................. 282
3.02.01.02.04.Pameran/Ekspo............................................................................................. 285
3.02.01.02.05.Lomba............................................................................................................ 288
REKAP ALOKASI BELANJA ASB NON FISIK ....................................... 292

STANDAR BIAYA UMUM (SBU) ....................................................... 295


PENJELASAN..................................................................................................................................295
PEMERINTAH KOTA

MOJOKERTO
TA 2019

PERATURAN WALIKOTA
MOJOKERTO

NOMOR 47 TAHUN 2018


WALIKOTA MOJOKERTO
PROVINSI JAWA TIMUR

PERATURAN WALIKOTA MOJOKERTO


NOMOR 47 TAHUN 2018

TENTANG
ANALISA STANDAR BELANJA (ASB) KOTA MOJOKERTO
TAHUN 2019
DENGAN RAHMAT TUHAN YANG MAHA ESA
WALIKOTA MOJOKERTO,

Menimbang : a. bahwa berdasarkan Peraturan Pemerintah Nomor 58 Tahun


2005 tentang Pengelolaan Keuangan Daerah Pasal 39 ayat (2)
dijelaskan bahwa Penyusunan anggaran berdasarkan prestasi
kerja dilakukan berdasarkan capaian kinerja, indikator kinerja,
analisis standar belanja, standar satuan harga dan standar
pelayanan minimal;

b. bahwa berdasarkan Peraturan Menteri Dalam Negeri Nomor 13


Tahun 2006 pasal 89 Huruf e, dijelaskan bahwa Dokumen
sebagai lampiran meliputi KUA, PPA, kode rekening APBD,
format RKA - SKPD, analisis standar belanja, dan standar
satuan harga;

c. bahwa berdasarkan pertimbangan sebagaimana dimaksud


dalam huruf a dan huruf b serta dalam rangka terselenggaranya
penganggaran secara efektif, efisien dan akuntabel serta
hasilnya dapat dipertanggungjawabkan baik dari aspek fisik,
keuangan maupun manfaatnya bagi kelancaran tugas
pemerintahan, perlu menetapkan Peraturan Walikota tentang
Analisa Standar Belanja Kota Mojokerto Tahun Anggaran 2019;

Mengingat : 1. Undang-Undang Nomor 17 Tahun 1950 tentang Pembentukan


Daerah Kota Kecil dalam Lingkungan Propinsi Jawa Timur /
Jawa Tengah / Jawa Barat sebagaimana telah diubah dengan
Undang-Undang Nomor 13 Tahun 1954 tentang Perubahan
Undang-Undang Nomor 16 dan 17 Tahun 1950 tentang
Pembentukan Kota-Kota Besar dan Kota-Kota Kecil di Jawa
(Lembaran Negara Republik Indonesia Tahun 1954 Nomor 40,
Tambahan Lembaran Negara Republik Indonesia Nomor 551);
2

Undang-Undang Nomor 23 Tahun 2014 tentang Pemerintahan


2.
Daerah (Lembaran Negara Republik Indonesia Tahun 2014
Nomor 244, Tambahan Lembaran Negara Nomor 5587)
sebagaimana telah diubah beberapa kali, terakhir dengan
Undang-Undang Nomor 9 Tahun 2015 tentang Perubahan
Kedua Atas Undang-Undang Nomor 23 Tahun 2014 tentang
Pemerintahan Daerah (Lembaran Negara Republik Indonesia
Tahun 2014 Nomor 244, Tambahan Lembaran Negara Republik
Indonesia Nomor 5587);

Peraturan Pemerintah Nomor 47 Tahun 1982 tentang


3.
Perubahan Batas Wilayah Kotamadya Daerah Tingat II
Mojokerto (Lembaran Negara Republik Indonesia Tahun 1982
Nomor 74, Tambahan Lembaran Negara Republik Indonesia
Nomor 3242);

Peraturan Pemerintah Nomor 58 Tahun 2005 tentang


4.
Pengelolaan Keuangan Daerah (Lembaran Negara Republik
Indonesia Tahun 2005 Nomor 140, Tambahan Lembaran
Negara Republik Indonesia Nomor 4578);

Peraturan Pemerintah nomor 27 Tahun 2014 tentang


5.
Pengelolaan Barang Milik Negara/Daerah (Lembaran Negara
Tahun 2014 Nomor 92 Tambahan Lembaran negara nomor
5533);

Peraturan Presiden Nomor 16 Tahun 2018 tentang Pengadaan


6.
Barang dan Jasa Pemerintah;

Peraturan Menteri Dalam Negeri Nomor 13 tahun 2006 tentang


7.
Pedoman Pengelolaan Keuangan Daerah sebagaimana telah
diubah dengan Peraturan Menteri Dalam negeri Nomor 21
Tahun 2011 tentang Perubahan Kedua atas Peraturan Menteri
Dalam Negeri Nomor 13 Tahun 2006 tentang Pedoman
Pengelolaan Daerah; Peraturan Menteri Perhubungan Republik
Indonesia Nomor PM 75 Tahun 2013 tentang Standart Biaya
tahun 2014;

Peraturan Menteri Dalam Negeri Nomor 19 Tahun 2016 tentang


8.
Pedoman Pengelolaan Barang Milik Daerah;

Peraturan Menteri Dalam Negeri Nomor 108 Tahun 2016


9.
tentang Penggolongan dan Kodefikasi Barang Milik Daerah;

Peraturan Menteri Pekerjaan Umum dan Perumahan Rakyat


10.
3

Republik Indonesia Nomor 28/PRT/M/2016 tentang Pedoman


Analisis tentang Harga Satuan Pekerjaan Bidang Pekerjaan
Umum;

11. Peraturan Menteri Keuangan Republik Indonesia Nomor


32/PMK.02/2018 tentang Standar Biaya masukan Tahun
Anggaran 2019;

12. Peraturan Daerah Kota Mojokerto Nomor 7 Tahun 2007 tentang


Pedoman Pengelolaan Keuangan Daerah sebagaimana telah
diubah dengan Peraturan Daerah Kota Mojokerto Nomor 5
Tahun 2009 tentang Perubahan atas Peraturan Daerah Kota
Mojokerto Nomor 7 Tahun 2007 tentang Pokok-pokok
Pengelolaan Keuangan Daerah;

13. Peraturan Daerah Kota Mojokerto Nomor 8 Tahun 2016 tentang


Pembentukan Perangkat Daerah Kota Mojokerto;

MEMUTUSKAN :

Menetapkan : PERATURAN WALIKOTA MOJOKERTO TENTANG ANALISA


STANDAR BELANJA PEMERINTAH KOTA MOJOKERTO TAHUN
2019.
BAB I
KETENTUAN UMUM

Pasal 1

1. Daerah adalah kota Mojokerto.


2. Pemerintah Daerah adalah Pemerintah Daerah Kota Mojokerto.
3. Anggaran Pendapatan dan Belanja daerah yang selanjtnya
disingkat APBD adalah Anggaran dan Pendapatan Belanja
Pemerintah Daerah Kota Mojokerto.
4. Perangkat Daerah adalah Perangkat Daerah di Lingkungan
Pemerintah Kota Mojokerto
5. Tim Anggaran Pemerintah Daerah yang selanjutnya disingkat TAPD
adalah Tim Anggaran Pemerintah Daerah Kota Mojokerto.
6. Rencana Kerja dan Anggaran Satuan Kerja Perangkat Daerah yang
selanjutnya disingkat RKA-SKPD adalah perencanaan dan
penganggaran yang berisi program,kegiatan dan anggaran
Perangkat Daerah Kota Mojokerto.
7. Dokumen Pelaksanaan Anggaran Satuan Kerja Perangkat Daerah
4

yang selanjutnya disingkat DPA-SKPD adalah dokumen yang


memuat pendapatan dan belanja setiap Perangkat Daerah yang
digunakan sebagai dasar pelaksanaan oleh pengguna anggaran.
8. Analisa Standar Belanja yang selanjutnya disingkat ASB adalah
penilaian kewajaran atas beban kerja dan biaya yang digunakan
untuk melaksanakan suatu kegiatan yang akan dilaksanakan oleh
suatu Perangkat Daerah di lingkungan Pemerintah Kota Mojokerto
dalam satu tahun anggaran.

BAB II
MAKSUD DAN TUJUAN

Pasal 2

Penyusunan ASB dimaksudkan untuk mewujudkan perencanaan dan


penggunaan anggaran belanja daerah yang efektif, efisien, transparan,
adil, dapat dipertanggungjawabkan dan berdasarkan pada kewajaran
ekonomi melalui standarisasi pengukuran belanja kegiatan
berdasarkan penyetaraan nama kegiatan yang berlaku sama untuk
seluruh Perangkat Daerah.

Pasal 3

Penerapan ASB bertujuan untuk :


a. Menentukan kewajaran belanja untuk melaksanakan suatu
kegiatan sesuai dengan tugas dan fungsinya;
b. Meminimalisir terjadinya pengeluaran yang kurang jelas yang
menyebabkan inefisiensi anggaran;
c. Meningkatkan efisiensi dan efektivitas dalam pengelolaan
Keuangan Daerah;
d. Menentukan anggaran berdasarkan pada tolok ukur kinerja yang
jelas;

BAB III
RUANG LINGKUP

Pasal 4

Ruang Lingkup Peraturan Walikota ini meliputi :


a. Jenis ASB;
b. Komponen ASB;
5

c. Pengunaan ASB;
d. Pengendalian dan Pengawasan

BAB IV
JENIS ASB

Pasal 5

(1) ASB terdiri dari :


a. Standar Biaya Umum atau yang selanjutnya disingkat SBU,
memuat standarisasi honorarium, upah / jasa dan biaya
operasional dalam menentukan kewajaran belanja atas anggaran
yang diajukan Perangkat Daerah (PD) dalam melaksanakan
kegiatan;’
b. Harga Satuan Pokok Kegiatan yang selanjutnya disingkat HSPK,
memuat rekapitulasi standar kegiatan fisik/ konstruksi serta
uraian kegiatan kegiatan fisik/ konstruksi;
c. Analisa Standar Belanja Fisik yang selanjutnya disingkat ASB
Fisik, memuat standarisasi biaya kegiatan fisik melalui analisis
yang distandarkan untuk jenis komponen kegiatan dengan
menggunakan standar barang, harga satuan barang dan upah/
jasa sebagai komponen penyusunnya;
d. Analisa Standar Belanja Non Fisik yang selanjutnya disingkat
ASB Non Fisik, memuat standarisasi biaya kegiatan non fisik
melalui analisis yang distandarkan untuk jenis komponen
kegiatan dengan menggunakan standar barang, harga satuan
barang dan honorarium/upah/jasa sebagai komponen
penyusunnya;
(2) Rincian ASB sebagaimana dimaksud pada ayat (1) tercantum
dalam Lampiran Peraturan Walikota ini.

BAB V
KOMPONEN ASB

Pasal 6

Komponen ASB meliputi :


a. Deskripsi;
b. Pengendali Belanja;
c. Satuan Pengendali Belanja Tetap;
6

d. Satuan Pengendali Belanja Variabel;

Pasal 7

(1) Deskripsi sebagaimana dimaksud dalam Pasal 6 huruf a


merupakan penjelasan dari masing-masing ASB yang ada,
termasuk menjelaskan rentang waktu penggunaan ASB untuk
masing-masing kegiatan.
(2) Pengendali Belanja sebagaimana dimaksud dalam Pasal 6 huruf b
merupakan faktor-faktor yang memicu belanja / biaya menjadi
besar kecilnya belanja dari suatu kegiatan.
(3) Satuan Pengendali Belanja Tetap sebagaimana dimaksud dalam
Pasal 6 huruf c merupakan belanja yang nilainya tetap untuk
melaksanakan suatu kegiatan.
(4) Satuan Pengendali belanja Variabel sebagaimana dimaksud dalam
Pasal 6 huruf d merupakan belanja yang besarnya berubah sesuai
dengan perubahan volume / target kinerja suatu kegiatan.

BAB VI
PENGGUNAAN ASB

Pasal 8

(1) ASB dipergunakan untuk menentukan besaran biaya setiap


kegiatan dalam rangka penyusunan RKA- SKPD.
(2) Setiap kegiatan sebagaimana dimaksud pada ayat (1) dapat
digolongkan atau disetarakan menurut ciri dan jenis yang sama
atau hampir sama sesuai dengan nomenklatur ASB kegiatan yang
distandarisasikan.

BAB VII
PENGENDALIAN DAN PENGAWASAN

Pasal 9

(1) Pengendalian terhadap penerapan ASB dalam rangka


penyusunan RKA-SKPD Pemerintah Kota Mojokerto dilakukan
oleh kepala Perangkat Daerah;
7

(2) Dalam hal terdapat kegiatan Perangkat Daerah yang belum diatur
dalam Peraturan Walikota ini, maka dapat dianggarkan sesuai
dengan kebutuhan riil dengan memperhatikan komponen barang /
jasa serta alokasi rincian objek belanja kegiatan yang
distandarisasikan dan telah mendapat persetujuan dari TAPD;

Pasal 10

Pengawasan terhadap pelaksanaan ASB dilakukan oleh Inspektorat


Pemerintah Kota Mojokerto.

Pasal 11

Peraturan Walikota ini mulai berlaku pada tanggal diundangkan.


Agar setiap orang mengetahuinya, memerintahkan pengundangan
Peraturan Walikota ini dengan penempatannya dalam Berita Daerah
Kota Mojokerto.

Ditetapkan di Mojokerto
pada tanggal 19 Juli 2018

WAKIL WALIKOTA MOJOKERTO

TTD

SUYITNO
diundangkan di Mojokerto
pada tanggal 19 Juli 2018
SEKRETARIS DAERAH KOTA MOJOKERTO

TTD

HARLISTYATI, S.H., M.Si.


Pembina Utama Muda
NIP. 19610519 198603 2 006
BERITA DAERAH KOTA MOJOKERTO TAHUN 2018 NOMOR
LAMPIRAN PERATURAN WALIKOTA
NOMOR 47 TAHUN 2018
TENTANG
ANALISA STANDAR BELANJA (ASB) KOTA MOJOKERTO TAHUN 2019
PEMERINTAH KOTA

MOJOKERTO
2019

HSPK

ANALISIS STANDAR BELANJA


(A S B )
HARGA SATUAN POKOK KEGIATAN (HSPK)
PEMERINTAH KOTA MOJOKERTO
TAHUN ANGGARAN 2019
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
2.01 HSPK FISIK KONSTRUKSI
2.01.01 BANGUNAN GEDUNG
2.01.01.01 A. Pekerjaan PERSIAPAN & TANAH

2.01.01.01.01 Pekerjaan Persiapan


2.01.01.01.01.001 1 m' Pembuatan Pagar Sementara m2 Nilai HSPK 614,335.00
Dari Kayu Tinggi 2 M (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.020 O.H 130,000 2,600.00
1.10.28.02.01.001.002 Kepala Tukang 0.020 O.H 120,000 2,400.00
1.10.28.02.01.001.004 Tukang Kayu 0.200 O.H 110,000 22,000.00
1.10.28.02.01.002.001 Pekerja 0.400 O.H 90,000 36,000.00
Jumlah Harga Tenaga Kerja 63,000.00
Bahan
1.1.7.01.01.05.002.00054 Dolken Kayu, dia. 8-10/400 cm 1.250 Batang 21,500 26,875.00
1.1.7.01.01.01.002.00001 Semen Portland 5.000 Kg 1,306 6,530.78
1.1.7.01.01.01.004.00001 Pasir Beton 0.005 m3 232,250 1,161.25
1.1.7.01.01.01.005.00009 Batu Kerikil Beton 0.009 m3 290,300 2,612.70
1.1.7.01.01.05.002.00036 Kayu Meranti, Kaso, Uk. 5 x 7 cm 0.072 m3 5,805,150 417,970.80
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.060 Kg 19,550 1,173.00
1.1.7.01.01.01.006.00006 Cat Meni Besi 0.400 Liter 37,200 14,880.00
Jumlah Harga Bahan 471,203.53
Peralatan
Jumlah Harga Peralatan
Jumlah 534,203.53
Overhead & Profit 15 % 80,130.53

Nilai HSPK : 614,335.00


2.01.01.01.01.002 1 m' Pembuatan Pagar Sementara m' Nilai HSPK 749,522.00
Seng Gelombang Tinggi 2 M (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.020 O.H 130,000 2,600.00
1.10.28.02.01.001.002 Kepala Tukang 0.020 O.H 120,000 2,400.00
1.10.28.02.01.001.004 Tukang Kayu 0.400 O.H 110,000 44,000.00
1.10.28.02.01.002.001 Pekerja 0.200 O.H 90,000 18,000.00
Jumlah Harga Tenaga Kerja 67,000.00
Bahan
1.1.7.01.01.05.002.00054 Dolken Kayu, dia. 8-10/400 cm 1.250 Batang 21,500 26,875.00
1.1.7.01.01.01.002.00001 Semen Portland 2.500 Kg 1,306 3,265.39
1.1.7.01.01.01.007.00003 Seng Gelombang BJLS 30 Uk. 80 cm x 1.200 Lembar 95,800 114,960.00
210 cm
1.1.7.01.01.01.004.00001 Pasir Beton 0.005 m3 232,250 1,161.25
1.1.7.01.01.01.005.00009 Batu Kerikil Beton 0.009 m3 290,300 2,612.70
1.1.7.01.01.05.002.00036 Kayu Meranti, Kaso, Uk. 5 x 7 cm 0.072 m3 5,805,150 417,970.80
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.060 Kg 19,550 1,173.00
1.1.7.01.01.01.006.00006 Cat Meni Besi 0.450 Liter 37,200 16,740.00
Jumlah Harga Bahan 584,758.14
Peralatan
Jumlah Harga Peralatan
Jumlah 651,758.14
Overhead & Profit 15 % 97,763.72

Nilai HSPK : 749,522.00


2.01.01.01.01.003 1 m' Pembuatan Pagar Sementara m' Nilai HSPK 2,852,069.00
Kawat Duri Tinggi 1,8 M (dibulatkan) :

Tenaga Kerja

1
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
1.10.28.02.01.001.001 Mandor 0.020 O.H 130,000 2,600.00
1.10.28.02.01.001.002 Kepala Tukang 0.020 O.H 120,000 2,400.00
1.10.28.02.01.001.004 Tukang Kayu 0.300 O.H 110,000 33,000.00
1.10.28.02.01.002.001 Pekerja 0.200 O.H 90,000 18,000.00
Jumlah Harga Tenaga Kerja 56,000.00
Bahan
1.1.7.01.01.05.002.00054 Dolken Kayu, dia. 8-10/400 cm 1.000 Batang 21,500 21,500.00
1.1.7.01.01.01.002.00001 Semen Portland 2.000 Kg 1,306 2,612.31
1.1.7.01.01.05.001.00023 Kawat Berduri 25.000 m' 95,800 2,395,000.00
1.1.7.01.01.01.004.00001 Pasir Beton 0.005 m3 232,250 1,161.25
1.1.7.01.01.01.005.00009 Batu Kerikil Beton 0.009 m3 290,300 2,612.70
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.060 Kg 19,550 1,173.00
Jumlah Harga Bahan 2,424,059.26
Peralatan
Jumlah Harga Peralatan
Jumlah 2,480,059.26
Overhead & Profit 15 % 372,008.89

Nilai HSPK : 2,852,069.00


2.01.01.01.01.004 1 m' Pengukuran Dan Pemasangan m' Nilai HSPK 165,105.00
Bouwplank (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.005 O.H 130,000 650.00
1.10.28.02.01.001.002 Kepala Tukang 0.010 O.H 120,000 1,200.00
1.10.28.02.01.001.004 Tukang Kayu 0.100 O.H 110,000 11,000.00
1.10.28.02.01.002.001 Pekerja 0.100 O.H 90,000 9,000.00
Jumlah Harga Tenaga Kerja 21,850.00
Bahan
1.1.7.01.01.05.002.00030 Kayu papan 3/20 0.007 m3 6,385,700 44,699.90
1.1.7.01.01.05.002.00028 Kayu balok 5/7 0.012 m3 6,385,700 76,628.40
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.020 Kg 19,550 391.00
Jumlah Harga Bahan 121,719.30
Peralatan
Jumlah Harga Peralatan
Jumlah 143,569.30
Overhead & Profit 15 % 21,535.40

Nilai HSPK : 165,105.00


2.01.01.01.01.005 1 m2 Pekerjaan Pembuatan Kantor m2 Nilai HSPK 2,133,831.00
Sementara Dengan Lantai Plesteran (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.050 O.H 130,000 6,500.00
1.10.28.02.01.001.002 Kepala Tukang 0.300 O.H 120,000 36,000.00
1.10.28.02.01.001.004 Tukang Kayu 2.000 O.H 110,000 220,000.00
1.10.28.02.01.001.006 Tukang Batu 1.000 O.H 110,000 110,000.00
1.10.28.02.01.002.001 Pekerja 2.000 O.H 90,000 180,000.00
Jumlah Harga Tenaga Kerja 552,500.00
Bahan
1.1.7.01.01.05.002.00054 Dolken Kayu, dia. 8-10/400 cm 1.250 Batang 21,500 26,875.00
1.1.7.01.01.05.002.00036 Kayu Meranti, Kaso, Uk. 5 x 7 cm 0.180 m3 5,805,150 1,044,927.00
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.080 Kg 19,550 1,564.00
1.1.7.01.01.01.008.00009 Besi Plat Strip 1.100 Kg 11,650 12,815.00
1.1.7.01.01.01.002.00001 Semen Portland 35.000 Kg 1,306 45,715.48
1.1.7.01.01.01.004.00002 Pasir Pasang 0.150 m3 232,250 34,837.50
1.1.7.01.01.01.004.00001 Pasir Beton 0.100 m3 232,250 23,225.00
1.1.7.01.01.01.005.00009 Batu Kerikil Beton 0.150 m3 290,300 43,545.00
1.1.7.01.01.01.005.00010 Batu Bata Merah, Kelas 1 30.000 Buah 871 26,123.13
1.1.7.01.01.01.007.00009 Seng Plat BJLS 30/90 cm 0.250 Lembar 52,250 13,062.50
1.1.7.01.01.01.003.00013 Kaca Krepyak Nako 0.200 Buah 23,250 4,650.00
1.1.7.01.01.01.003.00001 Kaca Polos Bening, 3 Mm 0.080 m2 98,700 7,896.00
1.1.7.01.01.01.022.00364 Kunci Tanam, Biasa 0.150 Buah 69,200 10,380.00
1.1.7.01.01.05.007.00024 Plywood Tebal 4 mm 0.060 Lembar 123,150 7,389.00
Jumlah Harga Bahan 1,303,004.61

2
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Peralatan
Jumlah Harga Peralatan
Jumlah 1,855,504.61
Overhead & Profit 15 % 278325.6911

Nilai HSPK : 2,133,831.00


2.01.01.01.01.006 1 m2 Pekerjaan Pembuatan Gudang m2 Nilai HSPK 2,129,118.00
Semen Dan Peralatan (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.050 O.H 130,000 6,500.00
1.10.28.02.01.001.002 Kepala Tukang 0.200 O.H 120,000 24,000.00
1.10.28.02.01.001.004 Tukang Kayu 2.000 O.H 110,000 220,000.00
1.10.28.02.01.002.001 Pekerja 1.000 O.H 90,000 90,000.00
Jumlah Harga Tenaga Kerja 340,500.00
Bahan
1.1.7.01.01.05.002.00054 Dolken Kayu, dia. 8-10/400 cm 1.700 Batang 21,500 36,550.00
1.1.7.01.01.05.002.00036 Kayu Meranti, Kaso, Uk. 5 x 7 cm 0.210 m3 5,805,150 1,219,081.50
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.300 Kg 19,550 5,865.00
1.1.7.01.01.01.002.00001 Semen Portland 10.500 Kg 1,306 13,714.64
1.1.7.01.01.01.004.00001 Pasir Beton 0.030 m3 232,250 6,967.50
1.1.7.01.01.01.005.00009 Batu Kerikil Beton 0.050 m3 290,300 14,515.00
1.1.7.01.01.01.007.00001 Seng Gelombang BJLS 30 Uk. 80 cm x 1.500 Lembar 134,100 201,150.00
300 cm
1.1.7.01.01.01.007.00009 Seng Plat BJLS 30/90 cm 0.250 Lembar 52,250 13,062.50
Jumlah Harga Bahan 1,510,906.14
Peralatan
Jumlah Harga Peralatan
Jumlah 1,851,406.14
Overhead & Profit 15 % 277710.9215

Nilai HSPK : 2,129,118.00


2.01.01.01.01.007 1 m2 Pekerjaan Pembuatan Bedeng m2 Nilai HSPK 2,145,203.00
Kerja (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.050 O.H 130,000 6,500.00
1.10.28.02.01.001.002 Kepala Tukang 0.200 O.H 120,000 24,000.00
1.10.28.02.01.001.004 Tukang Kayu 2.000 O.H 110,000 220,000.00
1.10.28.02.01.002.001 Pekerja 1.000 O.H 90,000 90,000.00
Jumlah Harga Tenaga Kerja 340,500.00
Bahan
1.1.7.01.01.05.002.00054 Dolken Kayu, dia. 8-10/400 cm 1.250 Batang 21,500 26,875.00
1.1.7.01.01.05.002.00036 Kayu Meranti, Kaso, Uk. 5 x 7 cm 0.186 m3 5,805,150 1,079,757.90
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.300 Kg 19,550 5,865.00
1.1.7.01.01.01.002.00001 Semen Portland 18.000 Kg 1,306 23,510.82
1.1.7.01.01.01.004.00001 Pasir Beton 0.030 m3 232,250 6,967.50
1.1.7.01.01.01.005.00009 Batu Kerikil Beton 0.050 m3 290,300 14,515.00
1.1.7.01.01.01.007.00001 Seng Gelombang BJLS 30 Uk. 80 cm x 1.500 Lembar 134,100 201,150.00
300 cm
1.1.7.01.01.05.007.00024 Plywood Tebal 4 mm 1.350 Lembar 123,150 166,252.50
Jumlah Harga Bahan 1,524,893.72
Peralatan
Jumlah Harga Peralatan
Jumlah 1,865,393.72
Overhead & Profit 15 % 279,809.06

Nilai HSPK : 2,145,203.00


2.01.01.01.01.008 1 m2 Pekerjaan Pembersihan m2 Nilai HSPK 17,825.00
Lapangan Dan Perataan (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.050 O.H 130,000 6,500.00
1.10.28.02.01.002.001 Pekerja 0.100 O.H 90,000 9,000.00
Jumlah Harga Tenaga Kerja 15,500.00

3
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Bahan
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
Jumlah 15,500.00
Overhead & Profit 15 % 2,325.00

Nilai HSPK : 17,825.00


2.01.01.01.01.009 1 m2 Pembuatan Stegger dari m2 Nilai HSPK 427,434.00
Bambu (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.050 O.H 130,000 6,500.00
1.10.28.02.01.001.002 Kepala Tukang 0.200 O.H 120,000 24,000.00
1.10.28.02.01.001.004 Tukang Kayu 2.000 O.H 110,000 220,000.00
1.10.28.02.01.002.001 Pekerja 1.000 O.H 90,000 90,000.00
Jumlah Harga Tenaga Kerja 340,500.00
Bahan
1.1.7.01.01.05.007.00040 Bambu Ori, Dia. 6 - 10 cm. Panjang 6 1.250 Batang 22,200 27,750.00
Meter
1.1.7.01.01.01.022.00470 Tali Ijuk 0.186 Kg 18,450 3,431.70
Jumlah Harga Bahan 31,181.70
Peralatan
Jumlah Harga Peralatan
Jumlah 371,681.70
Overhead & Profit 15 % 55,752.26

Nilai HSPK : 427,434.00


2.01.01.01.01.010 1 m2 Pekerjaan Pembuatan Jalan m2 Nilai HSPK 182,631.00
Sementara (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.005 O.H 130,000 650.00
1.10.28.02.01.002.001 Pekerja 1.000 O.H 90,000 90,000.00
Jumlah Harga Tenaga Kerja 90,650.00
Bahan
1.1.7.01.01.01.005.00006 Batu Kali Uk. 15-20 cm 0.150 m3 261,250 39,187.50
1.1.7.01.01.01.005.00004 Batu Pecah Uk. 3-5 cm 0.090 m3 296,100 26,649.00
1.1.7.01.01.01.004.00002 Pasir Pasang 0.010 m3 232,250 2,322.50
Jumlah Harga Bahan 68,159.00
Peralatan
Jumlah Harga Peralatan
Jumlah 158,809.00
Overhead & Profit 15 % 23,821.35

Nilai HSPK : 182,631.00


2.01.01.01.01.011 1 m3 Pekerjaan Pembongkaran m3 Nilai HSPK 1,479,636.00
Beton Bertulang (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.666 O.H 130,000 86,580.00
1.10.28.02.01.002.001 Pekerja 13.334 O.H 90,000 1,200,060.00
Jumlah Harga Tenaga Kerja 1,286,640.00
Bahan
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
Jumlah 1,286,640.00
Overhead & Profit 15 % 192,996.00

Nilai HSPK : 1,479,636.00


2.01.01.01.01.012 1 m3 Pembongkaran Beton m3 Nilai HSPK 194,408.00
(Menggunakan Jack Hammer) (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 1.200 OH 90,000 108,000.00

4
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
1.10.28.02.01.001.001 Mandor 0.120 OH 130,000 15,600.00
Jumlah Harga Tenaga Kerja 123,600.00
Bahan
1.1.7.01.01.04.001.00006 BBM non subsidi 2.500 Liter 14,450 36,125.00
Jumlah Harga Bahan 36,125.00
Peralatan
9.1.2.09.03.01.001.00040 Jack Hammer 0.250 Sewa-hari 37,300 9,325.00
Jumlah Harga Peralatan 9,325.00
Jumlah 169,050.00
Overhead & Profit 15 % 25,357.50

Nilai HSPK : 194,408.00


2.01.01.01.01.013 1 m3 Pembongkaran Pasangan Batu m3 Nilai HSPK 242,616.00
Kali (Manual) (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.205 O.H 130,000 26,650.00
1.10.28.02.01.002.001 Pekerja 2.048 O.H 90,000 184,320.00
Jumlah Harga Tenaga Kerja 210,970.00
Bahan
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
Jumlah 210,970.00
Overhead & Profit 15 % 31,645.50

Nilai HSPK : 242,616.00


2.01.01.01.01.014 1 M3 Pembongkaran Pasangan Batu m3 Nilai HSPK 73,215.00
Kali (Menggunakan Jack Hammer) (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.600 OH 90,000 54,000.00
1.10.28.02.01.001.001 Mandor 0.060 OH 130,000 7,800.00
Jumlah Harga Tenaga Kerja 61,800.00
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.09.03.01.001.00040 Jack Hammer 0.050 Sewa-hari 37,300 1,865.00
Jumlah Harga Peralatan 1,865.00
Jumlah 63,665.00
Overhead & Profit 15 % 9,549.75

Nilai HSPK : 73,215.00


2.01.01.01.01.015 1 m3 Pekerjaan Pembongkaran m3 Nilai HSPK 739,818.00
Tembok Batu Bata (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.333 O.H 130,000 43,290.00
1.10.28.02.01.002.001 Pekerja 6.667 O.H 90,000 600,030.00
Jumlah Harga Tenaga Kerja 643,320.00
Bahan
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
Jumlah 643,320.00
Overhead & Profit 15 % 96,498.00

Nilai HSPK : 739,818.00


2.01.01.01.01.016 1 m2 Pekerjaan Pembongkaran m2 Nilai HSPK 13,369.00
Penutup Atap Tidak Dipakai Kembali (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.038 O.H 130,000 4,875.00
1.10.28.02.01.002.001 Pekerja 0.075 O.H 90,000 6,750.00

5
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Jumlah Harga Tenaga Kerja 11,625.00
Bahan
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
Jumlah 11,625.00
Overhead & Profit 15 % 1,743.75

Nilai HSPK : 13,369.00


2.01.01.01.01.017 1 m2 Pekerjaan Pembongkaran m2 Nilai HSPK 26,738.00
Penutup Atap Dan Dipakai Kembali (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.075 O.H 130,000 9,750.00
1.10.28.02.01.002.001 Pekerja 0.150 O.H 90,000 13,500.00
Jumlah Harga Tenaga Kerja 23,250.00
Bahan
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
Jumlah 23,250.00
Overhead & Profit 15 % 3,487.50

Nilai HSPK : 26,738.00


2.01.01.01.01.018 1 m2 Pembongkaran Paving m2 Nilai HSPK 22,195.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.010 O.H 130,000 1,300.00
1.10.28.02.01.002.001 Pekerja 0.200 O.H 90,000 18,000.00
Jumlah Harga Tenaga Kerja 19,300.00
Bahan
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
Jumlah 19,300.00
Overhead & Profit 15 % 2,895.00

Nilai HSPK : 22,195.00


2.01.01.01.01.019 1 Unit Papan Nama Proyek Unit Nilai HSPK 1,873,078.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 1.000 OH 90,000 90,000.00
1.10.28.02.01.001.004 Tukang Kayu 1.000 OH 110,000 110,000.00
1.10.28.02.01.001.005 Tukang Cat 1.500 OH 110,000 165,000.00
1.10.28.02.01.001.002 Kepala Tukang 0.100 OH 120,000 12,000.00
1.10.28.02.01.001.001 Mandor 0.100 OH 130,000 13,000.00
Jumlah Harga Tenaga Kerja 390,000.00
Bahan
1.1.7.01.01.05.002.00007 Kayu Bengkirai, Papan 0.025 m3 9,288,250 232,206.25
1.1.7.01.01.05.002.00006 Kayu Bengkirai, Balok 0.090 m3 9,288,250 835,942.50
1.1.7.01.01.01.022.00106 Paku Uk. 4 - 7 cm 0.600 Kg 17,050 10,230.00
1.1.7.01.01.01.006.00006 Cat Meni Besi 0.750 Kg 37,200 27,900.00
1.1.7.01.01.01.006.00036 Plamir Kayu 0.300 Kg 41,250 12,375.00
1.1.7.01.01.01.022.00224 Amplas Kasar 2.000 Lembar 5,850 11,700.00
1.1.7.01.01.01.022.00249 Kuas Cat 4inch. 0.200 Buah 17,050 3,410.00
1.1.7.01.01.01.006.00013 Cat Kayu 0.400 Kg 72,000 28,800.00
1.1.7.01.01.01.002.00001 Semen Portland 25.000 Kg 1,306 32,653.91
1.1.7.01.01.01.004.00001 Pasir Beton 0.060 m3 232,250 13,935.00
1.1.7.01.01.01.005.00004 Batu Pecah Uk. 3-5 cm 0.100 m3 296,100 29,610.00
Jumlah Harga Bahan 1,238,762.66
Peralatan
Jumlah Harga Peralatan
Jumlah 1,628,762.66
Overhead & Profit 15 % 244,314.40

6
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f

Nilai HSPK : 1,873,078.00


2.01.01.01.02 Pekerjaan Tanah
2.01.01.01.02.001 1 m3 Pekerjaan Galian Tanah Biasa m3 Nilai HSPK 81,363.00
Sedalam 1 Meter (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.025 O.H 130,000 3,250.00
1.10.28.02.01.002.001 Pekerja 0.750 O.H 90,000 67,500.00
Jumlah Harga Tenaga Kerja 70,750.00
Bahan
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
Jumlah 70,750.00
Overhead & Profit 15 % 10,612.50

Nilai HSPK : 81,363.00


2.01.01.01.02.002 1 m3 Pekerjaan Galian Tanah Biasa m3 Nilai HSPK 99,878.00
Sedalam 2 Meter (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.045 O.H 130,000 5,850.00
1.10.28.02.01.002.001 Pekerja 0.900 O.H 90,000 81,000.00
Jumlah Harga Tenaga Kerja 86,850.00
Bahan
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
Jumlah 86,850.00
Overhead & Profit 15 % 13,027.50

Nilai HSPK : 99,878.00


2.01.01.01.02.003 1 m3 Pekerjaan Galian Tanah Biasa m3 Nilai HSPK 118,692.00
Sedalam 3 Meter (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.067 O.H 130,000 8,710.00
1.10.28.02.01.002.001 Pekerja 1.050 O.H 90,000 94,500.00
Jumlah Harga Tenaga Kerja 103,210.00
Bahan
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
Jumlah 103,210.00
Overhead & Profit 15 % 15,481.50

Nilai HSPK : 118,692.00


2.01.01.01.02.004 1 m3 Pekerjaan Galian Tanah Keras m3 Nilai HSPK 108,284.00
Sedalam 1 Meter (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.032 O.H 130,000 4,160.00
1.10.28.02.01.002.001 Pekerja 1.000 O.H 90,000 90,000.00
Jumlah Harga Tenaga Kerja 94,160.00
Bahan
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
Jumlah 94,160.00
Overhead & Profit 15 % 14,124.00

Nilai HSPK : 108,284.00

7
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
2.01.01.01.02.005 1 m3 Pekerjaan Galian Tanah Cadas m3 Nilai HSPK 164,220.00
Sedalam 1 Meter (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.060 O.H 130,000 7,800.00
1.10.28.02.01.002.001 Pekerja 1.500 O.H 90,000 135,000.00
Jumlah Harga Tenaga Kerja 142,800.00
Bahan
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
Jumlah 142,800.00
Overhead & Profit 15 % 21,420.00

Nilai HSPK : 164,220.00


2.01.01.01.02.006 1 m3 Pekerjaan Galian Tanah m3 Nilai HSPK 130,928.00
Lumpur Sedalam 1 Meter (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.045 O.H 130,000 5,850.00
1.10.28.02.01.002.001 Pekerja 1.200 O.H 90,000 108,000.00
Jumlah Harga Tenaga Kerja 113,850.00
Bahan
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
Jumlah 113,850.00
Overhead & Profit 15 % 17,077.50

Nilai HSPK : 130,928.00


2.01.01.01.02.007 1 m2 Pekerjaan Pekerjaan Stripping m2 Nilai HSPK 5,923.00
Tebing Setinggi 1 M (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.005 O.H 130,000 650.00
1.10.28.02.01.002.001 Pekerja 0.050 O.H 90,000 4,500.00
Jumlah Harga Tenaga Kerja 5,150.00
Bahan
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
Jumlah 5,150.00
Overhead & Profit 15 % 772.50

Nilai HSPK : 5,923.00


2.01.01.01.02.008 1 m3 Pekerjaan Pembuangan Hasil m3 Nilai HSPK 35,650.00
Galian Sejauh 30 M (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.010 O.H 130,000 1,300.00
1.10.28.02.01.002.001 Pekerja 0.330 O.H 90,000 29,700.00
Jumlah Harga Tenaga Kerja 31,000.00
Bahan
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
Jumlah 31,000.00
Overhead & Profit 15 % 4,650.00

Nilai HSPK : 35,650.00


2.01.01.01.02.009 1 m3 Pekerjaan Pengurugan Kembali m3 Nilai HSPK 59,225.00
Galian Tanah Biasa Sedalam 1 M (dibulatkan) :

Tenaga Kerja

8
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
1.10.28.02.01.001.001 Mandor 0.050 O.H 130,000 6,500.00
1.10.28.02.01.002.001 Pekerja 0.500 O.H 90,000 45,000.00
Jumlah Harga Tenaga Kerja 51,500.00
Bahan
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
Jumlah 51,500.00
Overhead & Profit 15 % 7,725.00

Nilai HSPK : 59,225.00


2.01.01.01.02.010 1 m3 Pekerjaan Pengurugan Kembali m3 Nilai HSPK 33,293.00
Galian Tanah Biasa Sedalam 2 M (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.015 O.H 130,000 1,950.00
1.10.28.02.01.002.001 Pekerja 0.300 O.H 90,000 27,000.00
Jumlah Harga Tenaga Kerja 28,950.00
Bahan
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
Jumlah 28,950.00
Overhead & Profit 15 % 4,342.50

Nilai HSPK : 33,293.00


2.01.01.01.02.011 1 m3 Pekerjaan Pengurugan Kembali m3 Nilai HSPK 39,574.00
Galian Tanah Biasa Sedalam 3 M (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.022 O.H 130,000 2,912.00
1.10.28.02.01.002.001 Pekerja 0.350 O.H 90,000 31,500.00
Jumlah Harga Tenaga Kerja 34,412.00
Bahan
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
Jumlah 34,412.00
Overhead & Profit 15 % 5,161.80

Nilai HSPK : 39,574.00


2.01.01.01.02.012 1 m3 Pekerjaan Pengurugan Kembali m3 Nilai HSPK 36,107.00
Galian Tanah Keras Sedalam 1 M (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.011 O.H 130,000 1,391.00
1.10.28.02.01.002.001 Pekerja 0.333 O.H 90,000 30,006.00
Jumlah Harga Tenaga Kerja 31,397.00
Bahan
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
Jumlah 31,397.00
Overhead & Profit 15 % 4,709.55

Nilai HSPK : 36,107.00


2.01.01.01.02.013 1 m3 Pekerjaan Pengurugan Kembali m3 Nilai HSPK 54,740.00
Galian Tanah Cadas Sedalam 1 M (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.020 O.H 130,000 2,600.00
1.10.28.02.01.002.001 Pekerja 0.500 O.H 90,000 45,000.00
Jumlah Harga Tenaga Kerja 47,600.00
Bahan

9
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
Jumlah 47,600.00
Overhead & Profit 15 % 7,140.00

Nilai HSPK : 54,740.00


2.01.01.01.02.014 1 m3 Pekerjaan Pengurugan Kembali m3 Nilai HSPK 43,643.00
Galian Tanah Lumpur Sedalam 1 M (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.015 O.H 130,000 1,950.00
1.10.28.02.01.002.001 Pekerja 0.400 O.H 90,000 36,000.00
Jumlah Harga Tenaga Kerja 37,950.00
Bahan
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
Jumlah 37,950.00
Overhead & Profit 15 % 5,692.50

Nilai HSPK : 43,643.00


2.01.01.01.02.015 1 m3 Pekerjaan Pemadatan Tanah m3 Nilai HSPK 59,225.00
Setiap 20 Cm (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.050 O.H 130,000 6,500.00
1.10.28.02.01.002.001 Pekerja 0.500 O.H 90,000 45,000.00
Jumlah Harga Tenaga Kerja 51,500.00
Bahan
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
Jumlah 51,500.00
Overhead & Profit 15 % 7,725.00

Nilai HSPK : 59,225.00


2.01.01.01.02.016 1 m3 Pekerjaan Pemadatan Tanah m3 Nilai HSPK 61,433.00
Dengan Alat (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.050 O.H 130,000 6,500.00
1.10.28.02.01.002.001 Pekerja 0.500 O.H 90,000 45,000.00
Jumlah Harga Tenaga Kerja 51,500.00
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.09.03.01.001.00018 Stamper 0.050 Unit/hari 38,400 1,920.00
Jumlah Harga Peralatan 1,920.00
Jumlah 53,420.00
Overhead & Profit 15 % 8,013.00

Nilai HSPK : 61,433.00


2.01.01.01.02.017 1 m3 Pekerjaan Pemasangan Lapisan m3 Nilai HSPK 384,979.00
Pudel Campuran 1Kp : 3Pp : 7 Tl (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.080 O.H 130,000 10,400.00
1.10.28.02.01.001.002 Kepala Tukang 0.040 O.H 120,000 4,800.00
1.10.28.02.01.001.006 Tukang Batu 0.400 O.H 110,000 44,000.00
1.10.28.02.01.002.001 Pekerja 0.800 O.H 90,000 72,000.00
Jumlah Harga Tenaga Kerja 131,200.00
Bahan
1.1.7.01.01.01.002.00010 Kapur Gamping 0.135 kg 4,100 553.50
1.1.7.01.01.01.004.00002 Pasir Pasang 0.400 m3 232,250 92,900.00
1.1.7.01.01.01.004.00006 Tanah Liat 0.948 m3 116,150 110,110.20

10
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Jumlah Harga Bahan 203,563.70
Peralatan
Jumlah Harga Peralatan
Jumlah 334,763.70
Overhead & Profit 15 % 50,214.56

Nilai HSPK : 384,979.00


2.01.01.01.02.018 1 m2 Pekerjaan Pemasangan Lapisan m2 Nilai HSPK 145,073.00
Ijuk Tebal 10 Cm Untuk Bidang (dibulatkan) :
Resapan
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.015 O.H 130,000 1,950.00
1.10.28.02.01.002.001 Pekerja 0.150 O.H 90,000 13,500.00
Jumlah Harga Tenaga Kerja 15,450.00
Bahan
Jumlah Harga Bahan
Peralatan
1.1.7.01.01.01.022.00470 Tali Ijuk 6.000 Kg 18,450 110,700.00
Jumlah Harga Peralatan 110,700.00
Jumlah 126,150.00
Overhead & Profit 15 % 18,922.50

Nilai HSPK : 145,073.00


2.01.01.01.02.019 1 m3 Pekerjaan Pengurugan Pasir m3 Nilai HSPK 256,864.00
Urug (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.010 O.H 130,000 1,300.00
1.10.28.02.01.002.001 Pekerja 0.300 O.H 90,000 27,000.00
Jumlah Harga Tenaga Kerja 28,300.00
Bahan
1.1.7.01.01.01.004.00003 Pasir Urug 1.200 m3 162,550 195,060.00
Jumlah Harga Bahan 195,060.00
Peralatan
Jumlah Harga Peralatan
Jumlah 223,360.00
Overhead & Profit 15 % 33,504.00

Nilai HSPK : 256,864.00


2.01.01.01.02.020 1 m3 Pengurugan Sirtu Padat m3 Nilai HSPK 278,013.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.025 O.H 130,000 3,250.00
1.10.28.02.01.002.001 Pekerja 0.250 O.H 90,000 22,500.00
Jumlah Harga Tenaga Kerja 25,750.00
Bahan
1.1.7.01.01.01.004.00004 Pasir Sirtu 1.200 m3 180,000 216,000.00
Jumlah Harga Bahan 216,000.00
Peralatan
Jumlah Harga Peralatan
Jumlah 241,750.00
Overhead & Profit 15 % 36,262.50

Nilai HSPK : 278,013.00


2.01.01.01.02.021 1 m3 Pengurugan Sirtu Dengan m3 Nilai HSPK 91,713.00
Menggunakan Sirtu Ngoro (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.025 O.H 130,000 3,250.00
1.10.28.02.01.002.001 Pekerja 0.250 O.H 90,000 22,500.00
Jumlah Harga Tenaga Kerja 25,750.00
Bahan
1.1.7.01.01.01.004.00004 Pasir Sirtu 0.300 m3 180,000 54,000.00
Jumlah Harga Bahan 54,000.00
Peralatan

11
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Jumlah Harga Peralatan
Jumlah 79,750.00
Overhead & Profit 15 % 11,962.50

Nilai HSPK : 91,713.00


2.01.01.01.02.022 1 m3 Pekerjaan Pengurugan Dengan m3 Nilai HSPK 208,840.00
Tanah Urug (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.010 O.H 130,000 1,300.00
1.10.28.02.01.002.001 Pekerja 0.300 O.H 90,000 27,000.00
Jumlah Harga Tenaga Kerja 28,300.00
Bahan
1.1.7.01.01.01.004.00005 Tanah Urug 1.200 m3 127,750 153,300.00
Jumlah Harga Bahan 153,300.00
Peralatan
Jumlah Harga Peralatan
Jumlah 181,600.00
Overhead & Profit 15 % 27,240.00

Nilai HSPK : 208,840.00


2.01.01.01.02.023 1 m3 Pekerjaan Pengurugan Dengan m3 Nilai HSPK 272,941.00
Tanah Taman (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.010 O.H 130,000 1,300.00
1.10.28.02.01.002.001 Pekerja 0.300 O.H 90,000 27,000.00
Jumlah Harga Tenaga Kerja 28,300.00
Bahan
1.1.7.01.01.01.004.00007 Tanah Taman 1.200 m3 174,200 209,040.00
Jumlah Harga Bahan 209,040.00
Peralatan
Jumlah Harga Peralatan
Jumlah 237,340.00
Overhead & Profit 15 % 35,601.00

Nilai HSPK : 272,941.00


2.01.01.02 B. PEKERJAAN PONDASI
2.01.01.02.01 Pondasi
2.01.01.02.01.001 1 m3 Pekerjaan Pasangan Pondasi m3 Nilai HSPK 1,065,171.00
Batu Belah 15/20 Cm, Campuran (1 (dibulatkan) :
Pc : 3 Pp)
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.075 O.H 130,000 9,750.00
1.10.28.02.01.001.002 Kepala Tukang 0.075 O.H 120,000 9,000.00
1.10.28.02.01.001.006 Tukang Batu 0.750 O.H 110,000 82,500.00
1.10.28.02.01.002.001 Pekerja 1.500 O.H 90,000 135,000.00
Jumlah Harga Tenaga Kerja 236,250.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 202.000 Kg 1,306 263,843.61
1.1.7.01.01.01.004.00002 Pasir Pasang 0.485 m3 232,250 112,641.25
1.1.7.01.01.01.005.00006 Batu Kali Uk. 15-20 cm 1.200 m3 261,250 313,500.00
Jumlah Harga Bahan 689,984.86
Peralatan
Jumlah Harga Peralatan
Jumlah 926,234.86
Overhead & Profit 15 % 138,935.23

Nilai HSPK : 1,065,171.00


2.01.01.02.01.002 1 m3 Pekerjaan Pasangan Pondasi m3 Nilai HSPK 1,015,938.00
Batu Belah 15/20 Cm, Campuran (1 (dibulatkan) :
Pc : 4 Pp)
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.075 O.H 130,000 9,750.00
1.10.28.02.01.001.002 Kepala Tukang 0.075 O.H 120,000 9,000.00
1.10.28.02.01.001.006 Tukang Batu 0.750 O.H 110,000 82,500.00

12
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
1.10.28.02.01.002.001 Pekerja 1.500 O.H 90,000 135,000.00
Jumlah Harga Tenaga Kerja 236,250.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 163.000 Kg 1,306 212,903.51
1.1.7.01.01.01.004.00002 Pasir Pasang 0.520 m3 232,250 120,770.00
1.1.7.01.01.01.005.00006 Batu Kali Uk. 15-20 cm 1.200 m3 261,250 313,500.00
Jumlah Harga Bahan 647,173.51
Peralatan
Jumlah Harga Peralatan
Jumlah 883,423.51
Overhead & Profit 15 % 132,513.53

Nilai HSPK : 1,015,938.00


2.01.01.02.01.003 1 m3 Pekerjaan Pasangan Pondasi m3 Nilai HSPK 981,791.00
Batu Belah 15/20 Cm, Campuran (1 (dibulatkan) :
Pc : 5 Pp)
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.075 O.H 130,000 9,750.00
1.10.28.02.01.001.002 Kepala Tukang 0.075 O.H 120,000 9,000.00
1.10.28.02.01.001.006 Tukang Batu 0.750 O.H 110,000 82,500.00
1.10.28.02.01.002.001 Pekerja 1.500 O.H 90,000 135,000.00
Jumlah Harga Tenaga Kerja 236,250.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 136.000 Kg 1,306 177,637.28
1.1.7.01.01.01.004.00002 Pasir Pasang 0.544 m3 232,250 126,344.00
1.1.7.01.01.01.005.00006 Batu Kali Uk. 15-20 cm 1.200 m3 261,250 313,500.00
Jumlah Harga Bahan 617,481.28
Peralatan
Jumlah Harga Peralatan
Jumlah 853,731.28
Overhead & Profit 15 % 128,059.69

Nilai HSPK : 981,791.00


2.01.01.02.01.004 1 m3 Pekerjaan Pasangan Pondasi m3 Nilai HSPK 957,792.00
Batu Belah 15/20 Cm, Campuran (1 (dibulatkan) :
Pc : 6 Pp)
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.075 O.H 130,000 9,750.00
1.10.28.02.01.001.002 Kepala Tukang 0.075 O.H 120,000 9,000.00
1.10.28.02.01.001.006 Tukang Batu 0.750 O.H 110,000 82,500.00
1.10.28.02.01.002.001 Pekerja 1.500 O.H 90,000 135,000.00
Jumlah Harga Tenaga Kerja 236,250.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 117.000 Kg 1,306 152,820.31
1.1.7.01.01.01.004.00002 Pasir Pasang 0.561 m3 232,250 130,292.25
1.1.7.01.01.01.005.00006 Batu Kali Uk. 15-20 cm 1.200 m3 261,250 313,500.00
Jumlah Harga Bahan 596,612.56
Peralatan
Jumlah Harga Peralatan
Jumlah 832,862.56
Overhead & Profit 15 % 124,929.38

Nilai HSPK : 957,792.00


2.01.01.02.01.005 1 m3 Pekerjaan Pasangan Pondasi m3 Nilai HSPK 924,881.00
Batu Belah 15/20 Cm, Campuran (1 (dibulatkan) :
Pc : 8 Pp)
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.075 O.H 130,000 9,750.00
1.10.28.02.01.001.002 Kepala Tukang 0.075 O.H 120,000 9,000.00
1.10.28.02.01.001.006 Tukang Batu 0.750 O.H 110,000 82,500.00
1.10.28.02.01.002.001 Pekerja 1.500 O.H 90,000 135,000.00
Jumlah Harga Tenaga Kerja 236,250.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 91.000 Kg 1,306 118,860.24

13
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
1.1.7.01.01.01.004.00002 Pasir Pasang 0.584 m3 232,250 135,634.00
1.1.7.01.01.01.005.00006 Batu Kali Uk. 15-20 cm 1.200 m3 261,250 313,500.00
Jumlah Harga Bahan 567,994.24
Peralatan
Jumlah Harga Peralatan
Jumlah 804,244.24
Overhead & Profit 15 % 120,636.64

Nilai HSPK : 924,881.00


2.01.01.02.01.006 1 m3 Pekerjaan Pasangan Pondasi m3 Nilai HSPK 857,216.00
Batu Belah 15/20 Cm, Campuran (1 (dibulatkan) :
Pc : 3 Kp : 10 Pp)

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.075 O.H 130,000 9,750.00
1.10.28.02.01.001.002 Kepala Tukang 0.075 O.H 120,000 9,000.00
1.10.28.02.01.001.006 Tukang Batu 0.750 O.H 110,000 82,500.00
1.10.28.02.01.002.001 Pekerja 1.500 O.H 90,000 135,000.00
Jumlah Harga Tenaga Kerja 236,250.00
Bahan
1.1.7.01.01.01.005.00006 Batu Kali Uk. 15-20 cm 1.200 m3 261,250 313,500.00
1.1.7.01.01.01.002.00001 Semen Portland 61.000 Kg 1,306 79,675.55
1.1.7.01.01.01.002.00011 Kapur Pasang 0.147 m3 11,650 1,712.55
1.1.7.01.01.01.004.00002 Pasir Pasang 0.492 m3 232,250 114,267.00
Jumlah Harga Bahan 509,155.10
Peralatan
Jumlah Harga Peralatan
Jumlah 745,405.10
Overhead & Profit 15 % 111,810.76

Nilai HSPK : 857,216.00


2.01.01.02.01.007 1 m3 Pekerjaan Pasangan Pondasi m3 Nilai HSPK 835,240.00
Batu Belah 15/20 Cm, Campuran (dibulatkan) :
(1/4 Pc : 1 Kp : 4 Pp)

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.075 O.H 130,000 9,750.00
1.10.28.02.01.001.002 Kepala Tukang 0.075 O.H 120,000 9,000.00
1.10.28.02.01.001.006 Tukang Batu 0.750 O.H 110,000 82,500.00
1.10.28.02.01.002.001 Pekerja 1.500 O.H 90,000 135,000.00
Jumlah Harga Tenaga Kerja 236,250.00
Bahan
1.1.7.01.01.01.005.00006 Batu Kali Uk. 15-20 cm 1.200 m3 261,250 313,500.00
1.1.7.01.01.01.002.00001 Semen Portland 41.000 Kg 1,306 53,552.42
1.1.7.01.01.01.002.00011 Kapur Pasang 0.131 m3 11,650 1,526.15
1.1.7.01.01.01.004.00002 Pasir Pasang 0.523 m3 232,250 121,466.75
Jumlah Harga Bahan 490,045.32
Peralatan
Jumlah Harga Peralatan
Jumlah 726,295.32
Overhead & Profit 15 % 108,944.30

Nilai HSPK : 835,240.00


2.01.01.02.01.008 1 m3 Pekerjaan Pemasangan Batu m3 Nilai HSPK 582,558.00
Kosong (Aanstamping) (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.039 O.H 130,000 5,070.00
1.10.28.02.01.001.002 Kepala Tukang 0.039 O.H 120,000 4,680.00
1.10.28.02.01.001.006 Tukang Batu 0.390 O.H 110,000 42,900.00
1.10.28.02.01.002.001 Pekerja 0.780 O.H 90,000 70,200.00
Jumlah Harga Tenaga Kerja 122,850.00
Bahan
1.1.7.01.01.01.005.00006 Batu Kali Uk. 15-20 cm 1.200 m3 261,250 313,500.00
1.1.7.01.01.01.004.00003 Pasir Urug 0.432 m3 162,550 70,221.60

14
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Jumlah Harga Bahan 383,721.60
Peralatan
Jumlah Harga Peralatan
Jumlah 506,571.60
Overhead & Profit 15 % 75,985.74

Nilai HSPK : 582,558.00


2.01.01.02.01.009 1 m3 Pekerjaan Pasang Pondasi m3 Nilai HSPK 3,605,040.00
Siklop, 60% Beton Campuran 1 Pc : 2 (dibulatkan) :
Pb : 3 Kr Dan 40% Batu Belah

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.170 O.H 130,000 22,100.00
1.10.28.02.01.001.002 Kepala Tukang 0.085 O.H 120,000 10,200.00
1.10.28.02.01.001.006 Tukang Batu 0.850 O.H 110,000 93,500.00
1.10.28.02.01.002.001 Pekerja 3.400 O.H 90,000 306,000.00
Jumlah Harga Tenaga Kerja 431,800.00
Bahan
1.1.7.01.01.01.005.00006 Batu Kali Uk. 15-20 cm 0.480 m3 261,250 125,400.00
1.1.7.01.01.01.002.00001 Semen Portland 194.000 Kg 1,306 253,394.36
1.1.7.01.01.01.004.00001 Pasir Beton 0.312 m3 232,250 72,462.00
1.1.7.01.01.01.005.00009 Batu Kerikil Beton 0.468 m3 290,300 135,860.40
1.1.7.01.01.05.001.00017 Kawat Ikat (Bendrat) Besi Uk. 0,1 cm 1.800 Kg 402,000 723,600.00
x 25 Kg
1.1.7.01.01.01.012.00006 Besi Beton Polos 126.000 Kg 11,050 1,392,300.00
Jumlah Harga Bahan 2,703,016.76
Peralatan
Jumlah Harga Peralatan
Jumlah 3,134,816.76
Overhead & Profit 15 % 470,222.51

Nilai HSPK : 3,605,040.00


2.01.01.02.01.010 1 m3 Pekerjaan Pasang Pondasi m3 Nilai HSPK 1,044,602.00
Sumuran, Diameter 100 Cm (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.119 O.H 130,000 15,470.00
1.10.28.02.01.001.002 Kepala Tukang 0.080 O.H 120,000 9,600.00
1.10.28.02.01.001.006 Tukang Batu 0.800 O.H 110,000 88,000.00
1.10.28.02.01.002.001 Pekerja 2.400 O.H 90,000 216,000.00
Jumlah Harga Tenaga Kerja 329,070.00
Bahan
1.1.7.01.01.01.005.00006 Batu Kali Uk. 15-20 cm 0.450 m3 261,250 117,562.50
1.1.7.01.01.01.002.00001 Semen Portland 194.000 Kg 1,306 253,394.36
1.1.7.01.01.01.004.00001 Pasir Beton 0.312 m3 232,250 72,462.00
1.1.7.01.01.01.005.00009 Batu Kerikil Beton 0.468 m3 290,300 135,860.40
Jumlah Harga Bahan 579,279.26
Peralatan
Jumlah Harga Peralatan
Jumlah 908,349.26
Overhead & Profit 15 % 136,252.39

Nilai HSPK : 1,044,602.00


2.01.01.02.01.011 1 m' Pekerjaan Pembuatan Lubang Titik Nilai HSPK 49,289.00
Strouss Pile Diameter 20 cm (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.020 O.H 130,000 2,600.00
1.10.28.02.01.002.001 Pekerja 0.400 O.H 90,000 36,000.00
Jumlah Harga Tenaga Kerja 38,600.00
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.09.03.01.001.00034 Alat Bantu Strouss Pile 0.400 jam 10,650 4,260.00

15
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Jumlah Harga Peralatan 4,260.00
Jumlah 42,860.00
Overhead & Profit 15 % 6,429.00

Nilai HSPK : 49,289.00


2.01.01.02.01.012 1 m' Pekerjaan Pembuatan Lubang Titik Nilai HSPK 58,167.00
Strouss Pile Diameter 30 cm (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.024 O.H 130,000 3,120.00
1.10.28.02.01.002.001 Pekerja 0.480 O.H 90,000 43,200.00
Jumlah Harga Tenaga Kerja 46,320.00
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.09.03.01.001.00034 Alat Bantu Strouss Pile 0.400 jam 10,650 4,260.00
Jumlah Harga Peralatan 4,260.00
Jumlah 50,580.00
Overhead & Profit 15 % 7,587.00

Nilai HSPK : 58,167.00


2.01.01.03 C. STRUKTUR UTAMA
2.01.01.03.01 Pekerjaan Beton
2.01.01.03.01.001 1 m3 Pekerjaan Lantai Kerja K-100 m3 Nilai HSPK 965,573.00
F’C = 7,4 Mpa Slump (3-6) Cm, W/C (dibulatkan) :
= 0,87
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.060 O.H 130,000 7,800.00
1.10.28.02.01.001.002 Kepala Tukang 0.020 O.H 120,000 2,400.00
1.10.28.02.01.001.006 Tukang Batu 0.200 O.H 110,000 22,000.00
1.10.28.02.01.002.001 Pekerja 1.200 O.H 90,000 108,000.00
Jumlah Harga Tenaga Kerja 140,200.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 230.000 Kg 1,306 300,416.00
1.1.7.01.01.01.004.00001 Pasir Beton 0.638 m3 232,250 148,152.28
1.1.7.01.01.01.005.00009 Batu Kerikil Beton 0.761 m3 290,300 220,860.24
1.1.7.01.01.01.022.00468 Air Tawar 200.000 Liter 150 30,000.00
Jumlah Harga Bahan 699,428.51
Peralatan
Jumlah Harga Peralatan
Jumlah 839,628.51
Overhead & Profit 15 % 125,944.28

Nilai HSPK : 965,573.00


2.01.01.03.01.002 Membuat 1 m3 Beton Mutu F’C = m3 Nilai HSPK 1,195,547.00
7,4 Mpa (K 100), Slump (12+/-2) Cm, (dibulatkan) :
W/C = 0,87

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.083 O.H 130,000 10,790.00
1.10.28.02.01.001.002 Kepala Tukang 0.028 O.H 120,000 3,360.00
1.10.28.02.01.001.006 Tukang Batu 0.275 O.H 110,000 30,250.00
1.10.28.02.01.002.001 Pekerja 1.650 O.H 90,000 148,500.00
Jumlah Harga Tenaga Kerja 192,900.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 247.000 Kg 1,306 322,620.66
1.1.7.01.01.01.004.00001 Pasir Beton 0.869 m3 232,250 201,825.25
1.1.7.01.01.01.005.00009 Batu Kerikil Beton 0.999 m3 290,300 290,009.70
1.1.7.01.01.01.022.00468 Air Tawar 215.000 Liter 150 32,250.00
Jumlah Harga Bahan 846,705.61
Peralatan
Jumlah Harga Peralatan
Jumlah 1,039,605.61
Overhead & Profit 15 % 155,940.84

16
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f

Nilai HSPK : 1,195,547.00


2.01.01.03.01.003 Membuat 1 m3 Beton Mutu F’C = m3 Nilai HSPK 1,232,497.00
9,8 Mpa (K 125), Slump (12+/-2) Cm, (dibulatkan) :
W/C = 0,78

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.083 O.H 130,000 10,790.00
1.10.28.02.01.001.002 Kepala Tukang 0.028 O.H 120,000 3,360.00
1.10.28.02.01.001.006 Tukang Batu 0.275 O.H 110,000 30,250.00
1.10.28.02.01.002.001 Pekerja 1.650 O.H 90,000 148,500.00
Jumlah Harga Tenaga Kerja 192,900.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 276.000 Kg 1,306 360,499.19
1.1.7.01.01.01.004.00001 Pasir Beton 0.828 m3 232,250 192,303.00
1.1.7.01.01.01.005.00009 Batu Kerikil Beton 1.012 m3 290,300 293,783.60
1.1.7.01.01.01.022.00468 Air Tawar 215.000 Liter 150 32,250.00
Jumlah Harga Bahan 878,835.79
Peralatan
Jumlah Harga Peralatan
Jumlah 1,071,735.79
Overhead & Profit 15 % 160,760.37

Nilai HSPK : 1,232,497.00


2.01.01.03.01.004 Membuat 1 m3 Beton Mutu F’C = m3 Nilai HSPK 1,260,968.00
12,2 Mpa (K 150), Slump (12+/-2) (dibulatkan) :
Cm, W/C = 0,72

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.083 O.H 130,000 10,790.00
1.10.28.02.01.001.002 Kepala Tukang 0.028 O.H 120,000 3,360.00
1.10.28.02.01.001.006 Tukang Batu 0.275 O.H 110,000 30,250.00
1.10.28.02.01.002.001 Pekerja 1.650 O.H 90,000 148,500.00
Jumlah Harga Tenaga Kerja 192,900.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 299.000 Kg 1,306 390,540.79
1.1.7.01.01.01.004.00001 Pasir Beton 0.799 m3 232,250 185,567.75
1.1.7.01.01.01.005.00009 Batu Kerikil Beton 1.017 m3 290,300 295,235.10
1.1.7.01.01.01.022.00468 Air Tawar 215.000 Liter 150 32,250.00
Jumlah Harga Bahan 903,593.64
Peralatan
Jumlah Harga Peralatan
Jumlah 1,096,493.64
Overhead & Profit 15 % 164,474.05

Nilai HSPK : 1,260,968.00


2.01.01.03.01.005 Membuat 1 m3 Beton Mutu F’C = m3 Nilai HSPK 1,295,114.00
14,5 Mpa (K 175), Slump (12+/-2) (dibulatkan) :
Cm, W/C = 0,66

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.083 O.H 130,000 10,790.00
1.10.28.02.01.001.002 Kepala Tukang 0.028 O.H 120,000 3,360.00
1.10.28.02.01.001.006 Tukang Batu 0.275 O.H 110,000 30,250.00
1.10.28.02.01.002.001 Pekerja 1.650 O.H 90,000 148,500.00
Jumlah Harga Tenaga Kerja 192,900.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 326.000 Kg 1,306 425,807.02
1.1.7.01.01.01.004.00001 Pasir Beton 0.760 m3 232,250 176,510.00
1.1.7.01.01.01.005.00009 Batu Kerikil Beton 1.029 m3 290,300 298,718.70
1.1.7.01.01.01.022.00468 Air Tawar 215.000 Liter 150 32,250.00
Jumlah Harga Bahan 933,285.72
Peralatan
Jumlah Harga Peralatan

17
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Jumlah 1,126,185.72
Overhead & Profit 15 % 168,927.86

Nilai HSPK : 1,295,114.00


2.01.01.03.01.006 Membuat 1 m3 Beton Mutu F’C = m3 Nilai HSPK 1,327,090.00
16,9 Mpa (K 200), Slump (12+/-2) (dibulatkan) :
Cm, W/C = 0,61

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.083 O.H 130,000 10,790.00
1.10.28.02.01.001.002 Kepala Tukang 0.028 O.H 120,000 3,360.00
1.10.28.02.01.001.006 Tukang Batu 0.275 O.H 110,000 30,250.00
1.10.28.02.01.002.001 Pekerja 1.650 O.H 90,000 148,500.00
Jumlah Harga Tenaga Kerja 192,900.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 352.000 Kg 1,306 459,767.09
1.1.7.01.01.01.004.00001 Pasir Beton 0.731 m3 232,250 169,774.75
1.1.7.01.01.01.005.00009 Batu Kerikil Beton 1.031 m3 290,300 299,299.30
1.1.7.01.01.01.022.00468 Air Tawar 215.000 Liter 150 32,250.00
Jumlah Harga Bahan 961,091.14
Peralatan
Jumlah Harga Peralatan
Jumlah 1,153,991.14
Overhead & Profit 15 % 173,098.67

Nilai HSPK : 1,327,090.00


2.01.01.03.01.007 Membuat 1 m3 Beton Mutu F’C = m3 Nilai HSPK 1,352,157.00
19,3 Mpa (K 225), Slump (12+/-2) (dibulatkan) :
Cm, W/C = 0,58

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.083 O.H 130,000 10,790.00
1.10.28.02.01.001.002 Kepala Tukang 0.028 O.H 120,000 3,360.00
1.10.28.02.01.001.006 Tukang Batu 0.275 O.H 110,000 30,250.00
1.10.28.02.01.002.001 Pekerja 1.650 O.H 90,000 148,500.00
Jumlah Harga Tenaga Kerja 192,900.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 371.000 Kg 1,306 484,584.06
1.1.7.01.01.01.004.00001 Pasir Beton 0.698 m3 232,250 162,110.50
1.1.7.01.01.01.005.00009 Batu Kerikil Beton 1.047 m3 290,300 303,944.10
1.1.7.01.01.01.022.00468 Air Tawar 215.000 Liter 150 32,250.00
Jumlah Harga Bahan 982,888.66
Peralatan
Jumlah Harga Peralatan
Jumlah 1,175,788.66
Overhead & Profit 15 % 176,368.30

Nilai HSPK : 1,352,157.00


2.01.01.03.01.008 Membuat 1 m3 Beton Mutu F’C = m3 Nilai HSPK 1,367,411.00
21,7 Mpa (K 250), Slump (12+/-2) (dibulatkan) :
Cm, W/C = 0,56

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.083 O.H 130,000 10,790.00
1.10.28.02.01.001.002 Kepala Tukang 0.028 O.H 120,000 3,360.00
1.10.28.02.01.001.006 Tukang Batu 0.275 O.H 110,000 30,250.00
1.10.28.02.01.002.001 Pekerja 1.650 O.H 90,000 148,500.00
Jumlah Harga Tenaga Kerja 192,900.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 384.000 Kg 1,306 501,564.10
1.1.7.01.01.01.004.00001 Pasir Beton 0.692 m3 232,250 160,717.00
1.1.7.01.01.01.005.00009 Batu Kerikil Beton 1.039 m3 290,300 301,621.70
1.1.7.01.01.01.022.00468 Air Tawar 215.000 Liter 150 32,250.00
Jumlah Harga Bahan 996,152.80

18
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Peralatan
Jumlah Harga Peralatan
Jumlah 1,189,052.80
Overhead & Profit 15 % 178,357.92

Nilai HSPK : 1,367,411.00


2.01.01.03.01.009 Membuat 1 m3 Beton Mutu F’C = m3 Nilai HSPK 1,393,980.00
24,0 Mpa (K 275), Slump (12+/-2) (dibulatkan) :
Cm, W/C = 0,53

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.083 O.H 130,000 10,790.00
1.10.28.02.01.001.002 Kepala Tukang 0.028 O.H 120,000 3,360.00
1.10.28.02.01.001.006 Tukang Batu 0.275 O.H 110,000 30,250.00
1.10.28.02.01.002.001 Pekerja 1.650 O.H 90,000 148,500.00
Jumlah Harga Tenaga Kerja 192,900.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 406.000 Kg 1,306 530,299.54
1.1.7.01.01.01.004.00001 Pasir Beton 0.684 m3 232,250 158,859.00
1.1.7.01.01.01.005.00009 Batu Kerikil Beton 1.026 m3 290,300 297,847.80
1.1.7.01.01.01.022.00468 Air Tawar 215.000 Liter 150 32,250.00
Jumlah Harga Bahan 1,019,256.34
Peralatan
Jumlah Harga Peralatan
Jumlah 1,212,156.34
Overhead & Profit 15 % 181,823.45

Nilai HSPK : 1,393,980.00


2.01.01.03.01.010 Membuat 1 m3 Beton Mutu F’C = m3 Nilai HSPK 1,402,024.00
26,4 Mpa (K 300), Slump (12+/-2) (dibulatkan) :
Cm, W/C = 0,52

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.083 O.H 130,000 10,790.00
1.10.28.02.01.001.002 Kepala Tukang 0.028 O.H 120,000 3,360.00
1.10.28.02.01.001.006 Tukang Batu 0.275 O.H 110,000 30,250.00
1.10.28.02.01.002.001 Pekerja 1.650 O.H 90,000 148,500.00
Jumlah Harga Tenaga Kerja 192,900.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 413.000 Kg 1,306 539,442.63
1.1.7.01.01.01.004.00001 Pasir Beton 0.681 m3 232,250 158,162.25
1.1.7.01.01.01.005.00009 Batu Kerikil Beton 1.021 m3 290,300 296,396.30
1.1.7.01.01.01.022.00468 Air Tawar 215.000 Liter 150 32,250.00
Jumlah Harga Bahan 1,026,251.18
Peralatan
Jumlah Harga Peralatan
Jumlah 1,219,151.18
Overhead & Profit 15 % 182,872.68

Nilai HSPK : 1,402,024.00


2.01.01.03.01.011 Membuat 1 m3 Beton Mutu F’C = m3 Nilai HSPK 1,493,450.00
28,8 Mpa (K 325), Slump (12+/-2) (dibulatkan) :
Cm, W/C = 0,49

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.105 O.H 130,000 13,650.00
1.10.28.02.01.001.002 Kepala Tukang 0.035 O.H 120,000 4,200.00
1.10.28.02.01.001.006 Tukang Batu 0.350 O.H 110,000 38,500.00
1.10.28.02.01.002.001 Pekerja 2.100 O.H 90,000 189,000.00
Jumlah Harga Tenaga Kerja 245,350.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 439.000 Kg 1,306 573,402.70
1.1.7.01.01.01.004.00001 Pasir Beton 0.670 m3 232,250 155,607.50
1.1.7.01.01.01.005.00009 Batu Kerikil Beton 1.006 m3 290,300 292,041.80

19
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
1.1.7.01.01.01.022.00468 Air Tawar 215.000 Liter 150 32,250.00
Jumlah Harga Bahan 1,053,302.00
Peralatan
Jumlah Harga Peralatan
Jumlah 1,298,652.00
Overhead & Profit 15 % 194,797.80

Nilai HSPK : 1,493,450.00


2.01.01.03.01.012 Membuat 1 m3 Beton Mutu F’C = m3 Nilai HSPK 1,504,165.00
31,2 Mpa (K 350), Slump (12+/-2) (dibulatkan) :
Cm, W/C = 0,48

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.105 O.H 130,000 13,650.00
1.10.28.02.01.001.002 Kepala Tukang 0.035 O.H 120,000 4,200.00
1.10.28.02.01.001.006 Tukang Batu 0.350 O.H 110,000 38,500.00
1.10.28.02.01.002.001 Pekerja 2.100 O.H 90,000 189,000.00
Jumlah Harga Tenaga Kerja 245,350.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 448.000 Kg 1,306 585,158.11
1.1.7.01.01.01.004.00001 Pasir Beton 0.667 m3 232,250 154,910.75
1.1.7.01.01.01.005.00009 Batu Kerikil Beton 1.000 m3 290,300 290,300.00
1.1.7.01.01.01.022.00468 Air Tawar 215.000 Liter 150 32,250.00
Jumlah Harga Bahan 1,062,618.86
Peralatan
Jumlah Harga Peralatan
Jumlah 1,307,968.86
Overhead & Profit 15 % 196,195.33

Nilai HSPK : 1,504,165.00


2.01.01.03.01.013 1 Kg Pekerjaan Pembesian Dengan Kg Nilai HSPK 22,044.00
Besi Polos (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.000 O.H 130,000 52.00
1.10.28.02.01.001.002 Kepala Tukang 0.001 O.H 120,000 84.00
1.10.28.02.01.001.008 Tukang Besi 0.007 O.H 110,000 770.00
1.10.28.02.01.002.001 Pekerja 0.007 O.H 90,000 630.00
Jumlah Harga Tenaga Kerja 1,536.00
Bahan
1.1.7.01.01.01.012.00006 Besi Beton Polos 1.050 Kg 11,050 11,602.50
1.1.7.01.01.05.001.00017 Kawat Ikat (Bendrat) Besi Uk. 0,1 cm 0.015 Roll 402,000 6,030.00
x 25 Kg
Jumlah Harga Bahan 17,632.50
Peralatan
Jumlah Harga Peralatan
Jumlah 19,168.50
Overhead & Profit 15 % 2,875.28

Nilai HSPK : 22,044.00


2.01.01.03.01.014 1 Kg Pekerjaan Pembesian Dengan Kg Nilai HSPK 22,769.00
Besi Ulir (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.000 O.H 130,000 52.00
1.10.28.02.01.001.002 Kepala Tukang 0.001 O.H 120,000 84.00
1.10.28.02.01.001.008 Tukang Besi 0.007 O.H 110,000 770.00
1.10.28.02.01.002.001 Pekerja 0.007 O.H 90,000 630.00
Jumlah Harga Tenaga Kerja 1,536.00
Bahan
1.1.7.01.01.01.012.00007 Besi Beton Ulir 1.050 Kg 11,650 12,232.50
1.1.7.01.01.05.001.00017 Kawat Ikat (Bendrat) Besi Uk. 0,1 cm 0.015 Roll 402,000 6,030.00
x 25 Kg
Jumlah Harga Bahan 18,262.50
Peralatan
Jumlah Harga Peralatan

20
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Jumlah 19,798.50
Overhead & Profit 15 % 2,969.78

Nilai HSPK : 22,769.00


2.01.01.03.01.015 1 Kg Pekerjaan Pemasangan Kg Nilai HSPK 20,138.00
Wiremesh (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.0001 O.H. 130,000 13.00
1.10.28.02.01.001.002 Kepala Tukang 0.003 O.H. 120,000 300.00
1.10.28.02.01.001.008 Tukang Besi 0.003 O.H. 110,000 275.00
1.10.28.02.01.002.001 Pekerja 0.003 O.H. 90,000 225.00
Jumlah Harga Tenaga Kerja 813.00
Bahan
1.1.7.01.01.01.008.00047 Besi Wire Mesh 1.020 Kg 14,400 14,688.00
1.1.7.01.01.05.001.00017 Kawat Ikat (Bendrat) Besi Uk. 0,1 cm 0.005 Roll 402,000 2,010.00
x 25 Kg
Jumlah Harga Bahan 16,698.00
Peralatan
Jumlah Harga Peralatan
Jumlah 17,511.00
Overhead & Profit 15 % 2,626.65

Nilai HSPK : 20,138.00


2.01.01.03.01.016 1 m3 Membuat Pondasi Beton m3 Nilai HSPK 5,173,939.00
Bertulang (150 Kg Besi+Bekisting) (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.265 O.H 130,000 34,450.00
1.10.28.02.01.001.002 Kepala Tukang 0.262 O.H 120,000 31,440.00
1.10.28.02.01.001.008 Tukang Besi 1.050 O.H 110,000 115,500.00
1.10.28.02.01.001.004 Tukang Kayu 1.300 O.H 110,000 143,000.00
1.10.28.02.01.001.006 Tukang Batu 0.275 O.H 110,000 30,250.00
1.10.28.02.01.002.001 Pekerja 5.300 O.H 90,000 477,000.00
Jumlah Harga Tenaga Kerja 831,640.00
Bahan
1.1.7.01.01.05.002.00038 Kayu Meranti, Begesting 0.200 m3 5,224,650 1,044,930.00
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 1.500 Kg 19,550 29,325.00
1.1.7.01.01.04.002.00001 Minyak Pelumas 0.400 liter 43,000 17,200.00
1.1.7.01.01.01.012.00006 Besi Beton Polos 157.500 Kg 11,050 1,740,375.00
1.1.7.01.01.05.001.00017 Kawat Ikat (Bendrat) Besi Uk. 0,1 cm 0.090 Roll 402,000 36,180.00
x 25 Kg
1.1.7.01.01.01.002.00001 Semen Portland 336.000 Kg 1,306 438,868.58
1.1.7.01.01.01.004.00001 Pasir Beton 0.540 m3 232,250 125,415.00
1.1.7.01.01.01.005.00009 Batu Kerikil Beton 0.810 m3 290,300 235,143.00
Jumlah Harga Bahan 3,667,436.58
Peralatan
Jumlah Harga Peralatan
Jumlah 4,499,076.58
Overhead & Profit 15 % 674,861.49

Nilai HSPK : 5,173,939.00


2.01.01.03.01.017 1 m3 Membuat Sloof Beton m3 Nilai HSPK 6,421,166.00
Bertulang (200 Kg Besi+Bekisting) (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.283 O.H 130,000 36,790.00
1.10.28.02.01.001.002 Kepala Tukang 0.323 O.H 120,000 38,760.00
1.10.28.02.01.001.008 Tukang Besi 1.400 O.H 110,000 154,000.00
1.10.28.02.01.001.004 Tukang Kayu 1.560 O.H 110,000 171,600.00
1.10.28.02.01.001.006 Tukang Batu 0.275 O.H 110,000 30,250.00
1.10.28.02.01.002.001 Pekerja 5.650 O.H 90,000 508,500.00
Jumlah Harga Tenaga Kerja 939,900.00
Bahan
1.1.7.01.01.05.002.00038 Kayu Meranti, Begesting 0.270 m3 5,224,650 1,410,655.50

21
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 2.000 Kg 19,550 39,100.00
1.1.7.01.01.04.002.00001 Minyak Pelumas 0.600 liter 43,000 25,800.00
1.1.7.01.01.01.012.00006 Besi Beton Polos 210.000 Kg 11,050 2,320,500.00
1.1.7.01.01.05.001.00017 Kawat Ikat (Bendrat) Besi Uk. 0,1 cm 0.120 Roll 402,000 48,240.00
x 25 Kg
1.1.7.01.01.01.002.00001 Semen Portland 336.000 Kg 1,306 438,868.58
1.1.7.01.01.01.004.00001 Pasir Beton 0.540 m3 232,250 125,415.00
1.1.7.01.01.01.005.00009 Batu Kerikil Beton 0.810 m3 290,300 235,143.00
Jumlah Harga Bahan 4,643,722.08
Peralatan
Jumlah Harga Peralatan
Jumlah 5,583,622.08
Overhead & Profit 15 % 837,543.31

Nilai HSPK : 6,421,166.00


2.01.01.03.01.018 1 m3 Membuat Kolom Beton m3 Nilai HSPK 11,242,000.00
Bertulang (300 Kg Besi+Bekisting) (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.353 O.H 130,000 45,890.00
1.10.28.02.01.001.002 Kepala Tukang 0.403 O.H 120,000 48,360.00
1.10.28.02.01.001.008 Tukang Besi 2.100 O.H 110,000 231,000.00
1.10.28.02.01.001.004 Tukang Kayu 1.650 O.H 110,000 181,500.00
1.10.28.02.01.001.006 Tukang Batu 0.275 O.H 110,000 30,250.00
1.10.28.02.01.002.001 Pekerja 7.050 O.H 90,000 634,500.00
Jumlah Harga Tenaga Kerja 1,171,500.00
Bahan
1.1.7.01.01.05.002.00038 Kayu Meranti, Begesting 0.400 m3 5,224,650 2,089,860.00
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 4.000 Kg 19,550 78,200.00
1.1.7.01.01.04.002.00001 Minyak Pelumas 2.000 liter 43,000 86,000.00
1.1.7.01.01.01.012.00006 Besi Beton Polos 315.000 Kg 11,050 3,480,750.00
1.1.7.01.01.05.001.00017 Kawat Ikat (Bendrat) Besi Uk. 0,1 cm 0.180 Roll 402,000 72,360.00
x 25 Kg
1.1.7.01.01.01.002.00001 Semen Portland 336.000 Kg 1,306 438,868.58
1.1.7.01.01.01.004.00001 Pasir Beton 0.540 m3 232,250 125,415.00
1.1.7.01.01.01.005.00009 Batu Kerikil Beton 0.810 m3 290,300 235,143.00
1.1.7.01.01.05.002.00028 Kayu Meranti, Balok, Uk. 6 x 12 x 400 0.150 m3 6,385,700 957,855.00
cm
1.1.7.01.01.05.007.00035 Multipleks Uk. 120 x 240 cm x 9 mm 3.500 Lembar 174,200 609,700.00

1.1.7.01.01.05.002.00054 Dolken Kayu, dia. 8-10/400 cm 20.000 Batang 21,500 430,000.00


Jumlah Harga Bahan 8,604,151.58
Peralatan
Jumlah Harga Peralatan
Jumlah 9,775,651.58
Overhead & Profit 15 % 1,466,347.74

Nilai HSPK : 11,242,000.00


2.01.01.03.01.019 1 m3 Membuat Balok Beton m3 Nilai HSPK 8,873,081.00
Bertulang (200 Kg Besi+Bekisting) (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.318 O.H 130,000 41,340.00
1.10.28.02.01.001.002 Kepala Tukang 0.333 O.H 120,000 39,960.00
1.10.28.02.01.001.008 Tukang Besi 1.400 O.H 110,000 154,000.00
1.10.28.02.01.001.004 Tukang Kayu 1.650 O.H 110,000 181,500.00
1.10.28.02.01.001.006 Tukang Batu 0.275 O.H 110,000 30,250.00
1.10.28.02.01.002.001 Pekerja 6.350 O.H 90,000 571,500.00
Jumlah Harga Tenaga Kerja 1,018,550.00
Bahan
1.1.7.01.01.05.002.00038 Kayu Meranti, Begesting 0.320 m3 5,224,650 1,671,888.00
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 3.200 Kg 19,550 62,560.00
1.1.7.01.01.04.002.00001 Minyak Pelumas 1.600 liter 43,000 68,800.00
1.1.7.01.01.01.012.00006 Besi Beton Polos 210.000 Kg 11,050 2,320,500.00

22
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
1.1.7.01.01.05.001.00017 Kawat Ikat (Bendrat) Besi Uk. 0,1 cm 0.120 Roll 402,000 48,240.00
x 25 Kg
1.1.7.01.01.01.002.00001 Semen Portland 336.000 Kg 1,306 438,868.58
1.1.7.01.01.01.004.00001 Pasir Beton 0.540 m3 232,250 125,415.00
1.1.7.01.01.01.005.00009 Batu Kerikil Beton 0.810 m3 290,300 235,143.00
1.1.7.01.01.05.002.00028 Kayu Meranti, Balok, Uk. 6 x 12 x 400 0.140 m3 6,385,700 893,998.00
cm
1.1.7.01.01.05.007.00035 Multipleks Uk. 120 x 240 cm x 9 mm 2.800 Lembar 174,200 487,760.00

1.1.7.01.01.05.002.00054 Dolken Kayu, dia. 8-10/400 cm 16.000 Batang 21,500 344,000.00


Jumlah Harga Bahan 6,697,172.58
Peralatan
Jumlah Harga Peralatan
Jumlah 7,715,722.58
Overhead & Profit 15 % 1,157,358.39

Nilai HSPK : 8,873,081.00


2.01.01.03.01.020 1 m3 Membuat Plat Beton Bertulang m3 Nilai HSPK 8,226,265.00
(150 Kg Besi+Bekisting) (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.265 O.H 130,000 34,450.00
1.10.28.02.01.001.002 Kepala Tukang 0.265 O.H 120,000 31,800.00
1.10.28.02.01.001.008 Tukang Besi 1.050 O.H 110,000 115,500.00
1.10.28.02.01.001.004 Tukang Kayu 1.300 O.H 110,000 143,000.00
1.10.28.02.01.001.006 Tukang Batu 0.275 O.H 110,000 30,250.00
1.10.28.02.01.002.001 Pekerja 5.300 O.H 90,000 477,000.00
Jumlah Harga Tenaga Kerja 832,000.00
Bahan
1.1.7.01.01.05.002.00038 Kayu Meranti, Begesting 0.320 m3 5,224,650 1,671,888.00
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 3.200 Kg 19,550 62,560.00
1.1.7.01.01.04.002.00001 Minyak Pelumas 1.600 liter 43,000 68,800.00
1.1.7.01.01.01.012.00006 Besi Beton Polos 157.500 Kg 11,050 1,740,375.00
1.1.7.01.01.05.001.00017 Kawat Ikat (Bendrat) Besi Uk. 0,1 cm 0.090 Roll 402,000 36,180.00
x 25 Kg
1.1.7.01.01.01.002.00001 Semen Portland 336.000 Kg 1,306 438,868.58
1.1.7.01.01.01.004.00001 Pasir Beton 0.540 m3 232,250 125,415.00
1.1.7.01.01.01.005.00009 Batu Kerikil Beton 0.810 m3 290,300 235,143.00
1.1.7.01.01.05.002.00028 Kayu Meranti, Balok, Uk. 6 x 12 x 400 0.120 m3 6,385,700 766,284.00
cm
1.1.7.01.01.05.007.00035 Multipleks Uk. 120 x 240 cm x 9 mm 2.800 Lembar 174,200 487,760.00

1.1.7.01.01.05.002.00054 Dolken Kayu, dia. 8-10/400 cm 32.000 Batang 21,500 688,000.00


Jumlah Harga Bahan 6,321,273.58
Peralatan
Jumlah Harga Peralatan
Jumlah 7,153,273.58
Overhead & Profit 15 % 1,072,991.04

Nilai HSPK : 8,226,265.00


2.01.01.03.01.021 1 m3 Membuat Dinding Beton m3 Nilai HSPK 7,841,126.00
Bertulang (150 Kg Besi+Bekisting) (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.265 O.H 130,000 34,450.00
1.10.28.02.01.001.002 Kepala Tukang 0.262 O.H 120,000 31,440.00
1.10.28.02.01.001.008 Tukang Besi 1.050 O.H 110,000 115,500.00
1.10.28.02.01.001.004 Tukang Kayu 1.300 O.H 110,000 143,000.00
1.10.28.02.01.001.006 Tukang Batu 0.275 O.H 110,000 30,250.00
1.10.28.02.01.002.001 Pekerja 5.300 O.H 90,000 477,000.00
Jumlah Harga Tenaga Kerja 831,640.00
Bahan
1.1.7.01.01.05.002.00038 Kayu Meranti, Begesting 0.240 m3 5,224,650 1,253,916.00
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 3.200 Kg 19,550 62,560.00

23
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
1.1.7.01.01.04.002.00001 Minyak Pelumas 1.600 liter 43,000 68,800.00
1.1.7.01.01.01.012.00006 Besi Beton Polos 157.500 Kg 11,050 1,740,375.00
1.1.7.01.01.05.001.00017 Kawat Ikat (Bendrat) Besi Uk. 0,1 cm 0.090 Roll 402,000 36,180.00
x 25 Kg
1.1.7.01.01.01.002.00001 Semen Portland 336.000 Kg 1,306 438,868.58
1.1.7.01.01.01.004.00001 Pasir Beton 0.540 m3 232,250 125,415.00
1.1.7.01.01.01.005.00009 Batu Kerikil Beton 0.810 m3 290,300 235,143.00
1.1.7.01.01.05.002.00028 Kayu Meranti, Balok, Uk. 6 x 12 x 400 0.160 m3 6,385,700 1,021,712.00
cm
1.1.7.01.01.05.007.00035 Multipleks Uk. 120 x 240 cm x 9 mm 2.800 Lembar 174,200 487,760.00

1.1.7.01.01.05.002.00054 Dolken Kayu, dia. 8-10/400 cm 24.000 Batang 21,500 516,000.00


Jumlah Harga Bahan 5,986,729.58
Peralatan
Jumlah Harga Peralatan
Jumlah 6,818,369.58
Overhead & Profit 15 % 1,022,755.44

Nilai HSPK : 7,841,126.00


2.01.01.03.01.022 1 m3 Membuat Dinding Beton m3 Nilai HSPK 7,971,200.00
Bertulang (200 Kg Besi+Bekisting) (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.283 O.H 130,000 36,790.00
1.10.28.02.01.001.002 Kepala Tukang 0.323 O.H 120,000 38,760.00
1.10.28.02.01.001.008 Tukang Besi 1.400 O.H 110,000 154,000.00
1.10.28.02.01.001.004 Tukang Kayu 1.560 O.H 110,000 171,600.00
1.10.28.02.01.001.006 Tukang Batu 0.275 O.H 110,000 30,250.00
1.10.28.02.01.002.001 Pekerja 5.650 O.H 90,000 508,500.00
Jumlah Harga Tenaga Kerja 939,900.00
Bahan
1.1.7.01.01.05.002.00038 Kayu Meranti, Begesting 0.250 m3 5,224,650 1,306,162.50
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 3.000 Kg 19,550 58,650.00
1.1.7.01.01.04.002.00001 Minyak Pelumas 1.200 liter 43,000 51,600.00
1.1.7.01.01.01.012.00006 Besi Beton Polos 210.000 Kg 11,050 2,320,500.00
1.1.7.01.01.05.001.00017 Kawat Ikat (Bendrat) Besi Uk. 0,1 cm 0.120 Roll 402,000 48,240.00
x 25 Kg
1.1.7.01.01.01.002.00001 Semen Portland 336.000 Kg 1,306 438,868.58
1.1.7.01.01.01.004.00001 Pasir Beton 0.540 m3 232,250 125,415.00
1.1.7.01.01.01.005.00009 Batu Kerikil Beton 0.810 m3 290,300 235,143.00
1.1.7.01.01.05.002.00028 Kayu Meranti, Balok, Uk. 6 x 12 x 400 0.105 m3 6,385,700 670,498.50
cm
1.1.7.01.01.05.007.00035 Multipleks Uk. 120 x 240 cm x 9 mm 2.500 Lembar 174,200 435,500.00

1.1.7.01.01.05.002.00054 Dolken Kayu, dia. 8-10/400 cm 14.000 Batang 21,500 301,000.00


Jumlah Harga Bahan 5,991,577.58
Peralatan
Jumlah Harga Peralatan
Jumlah 6,931,477.58
Overhead & Profit 15 % 1,039,721.64

Nilai HSPK : 7,971,200.00


2.01.01.03.01.023 1 m' Membuat Kolom Praktis Beton m' Nilai HSPK 297,408.00
Bertulang (11 X 11) Cm (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.009 O.H 130,000 1,170.00
1.10.28.02.01.001.002 Kepala Tukang 0.006 O.H 120,000 720.00
1.10.28.02.01.001.008 Tukang Besi 0.020 O.H 110,000 2,200.00
1.10.28.02.01.001.004 Tukang Kayu 0.020 O.H 110,000 2,200.00
1.10.28.02.01.001.006 Tukang Batu 0.020 O.H 110,000 2,200.00
1.10.28.02.01.002.001 Pekerja 0.180 O.H 90,000 16,200.00
Jumlah Harga Tenaga Kerja 24,690.00
Bahan

24
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
1.1.7.01.01.05.002.00038 Kayu Meranti, Begesting 0.002 m3 5,224,650 10,449.30
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.010 Kg 19,550 195.50
1.1.7.01.01.01.012.00006 Besi Beton Polos 3.000 Kg 11,050 33,150.00
1.1.7.01.01.05.001.00017 Kawat Ikat (Bendrat) Besi Uk. 0,1 cm 0.450 Roll 402,000 180,900.00
x 25 Kg
1.1.7.01.01.01.002.00001 Semen Portland 4.000 Kg 1,306 5,224.63
1.1.7.01.01.01.004.00001 Pasir Beton 0.006 m3 232,250 1,393.50
1.1.7.01.01.01.005.00009 Batu Kerikil Beton 0.009 m3 290,300 2,612.70
Jumlah Harga Bahan 233,925.63
Peralatan
Jumlah Harga Peralatan
Jumlah 258,615.63
Overhead & Profit 15 % 38,792.34

Nilai HSPK : 297,408.00


2.01.01.03.01.024 1 m' Membuat Ring Balok Beton m' Nilai HSPK 149,896.00
Bertulang (10 X 15) Cm (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.015 O.H 130,000 1,950.00
1.10.28.02.01.001.002 Kepala Tukang 0.010 O.H 120,000 1,200.00
1.10.28.02.01.001.004 Tukang Kayu 0.033 O.H 110,000 3,630.00
1.10.28.02.01.001.006 Tukang Batu 0.033 O.H 110,000 3,630.00
1.10.28.02.01.001.008 Tukang Besi 0.033 O.H 110,000 3,630.00
1.10.28.02.01.002.001 Pekerja 0.297 O.H 90,000 26,730.00
Jumlah Harga Tenaga Kerja 40,770.00
Bahan
1.1.7.01.01.05.002.00038 Kayu Meranti, Begesting 0.003 m3 5,224,650 15,673.95
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.020 Kg 19,550 391.00
1.1.7.01.01.01.012.00006 Besi Beton Polos 3.600 Kg 11,050 39,780.00
1.1.7.01.01.05.001.00017 Kawat Ikat (Bendrat) Besi Uk. 0,1 cm 0.050 Roll 402,000 20,100.00
x 25 Kg
1.1.7.01.01.01.002.00001 Semen Portland 5.500 Kg 1,306 7,183.86
1.1.7.01.01.01.004.00001 Pasir Beton 0.009 m3 232,250 2,090.25
1.1.7.01.01.01.005.00009 Batu Kerikil Beton 0.015 m3 290,300 4,354.50
Jumlah Harga Bahan 89,573.56
Peralatan
Jumlah Harga Peralatan
Jumlah 130,343.56
Overhead & Profit 15 % 19,551.53

Nilai HSPK : 149,896.00


2.01.01.03.02 Pekerjaan Cetakan Beton (Bekisting)

2.01.01.03.02.001 1 m2 Pekerjaan Pasang Bekisting m2 Nilai HSPK 346,209.00


Untuk Pondasi (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.026 O.H 130,000 3,380.00
1.10.28.02.01.001.002 Kepala Tukang 0.026 O.H 120,000 3,120.00
1.10.28.02.01.001.004 Tukang Kayu 0.260 O.H 110,000 28,600.00
1.10.28.02.01.002.001 Pekerja 0.520 O.H 90,000 46,800.00
1.1.7.01.01.05.002.00038 Kayu Meranti, Begesting 0.040 m3 5,224,650 208,986.00
Jumlah Harga Tenaga Kerja 290,886.00
Bahan
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.300 Kg 19,550 5,865.00
1.1.7.01.01.04.002.00001 Minyak Pelumas 0.100 liter 43,000 4,300.00
Jumlah Harga Bahan 10,165.00
Peralatan
Jumlah Harga Peralatan
Jumlah 301,051.00
Overhead & Profit 15 % 45,157.65

Nilai HSPK : 346,209.00

25
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
2.01.01.03.02.002 1 m2 Pekerjaan Pasang Bekisting m2 Nilai HSPK 376,251.00
Untuk Sloof (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.026 O.H 130,000 3,380.00
1.10.28.02.01.001.002 Kepala Tukang 0.026 O.H 120,000 3,120.00
1.10.28.02.01.001.004 Tukang Kayu 0.260 O.H 110,000 28,600.00
1.10.28.02.01.002.001 Pekerja 0.520 O.H 90,000 46,800.00
Jumlah Harga Tenaga Kerja 81,900.00
Bahan
1.1.7.01.01.05.002.00038 Kayu Meranti, Begesting 0.045 m3 5,224,650 235,109.25
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.300 Kg 19,550 5,865.00
1.1.7.01.01.04.002.00001 Minyak Pelumas 0.100 liter 43,000 4,300.00
Jumlah Harga Bahan 245,274.25
Peralatan
Jumlah Harga Peralatan
Jumlah 327,174.25
Overhead & Profit 15 % 49,076.14

Nilai HSPK : 376,251.00


2.01.01.03.02.003 1 m2 Pekerjaan Pasang Bekisting m2 Nilai HSPK 608,479.00
Untuk Kolom (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.033 O.H 130,000 4,290.00
1.10.28.02.01.001.002 Kepala Tukang 0.033 O.H 120,000 3,960.00
1.10.28.02.01.001.004 Tukang Kayu 0.330 O.H 110,000 36,300.00
1.10.28.02.01.002.001 Pekerja 0.660 O.H 90,000 59,400.00
Jumlah Harga Tenaga Kerja 103,950.00
Bahan
1.1.7.01.01.05.002.00038 Kayu Meranti, Begesting 0.040 m3 5,224,650 208,986.00
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.400 Kg 19,550 7,820.00
1.1.7.01.01.04.002.00001 Minyak Pelumas 0.200 liter 43,000 8,600.00
1.1.7.01.01.05.002.00028 Kayu Meranti, Balok, Uk. 6 x 12 x 400 0.015 m3 6,385,700 95,785.50
cm
1.1.7.01.01.05.007.00035 Multipleks Uk. 120 x 240 cm x 9 mm 0.350 Lembar 174,200 60,970.00

1.1.7.01.01.05.002.00054 Dolken Kayu, dia. 8-10/400 cm 2.000 Batang 21,500 43,000.00


Jumlah Harga Bahan 425,161.50
Peralatan
Jumlah Harga Peralatan
Jumlah 529,111.50
Overhead & Profit 15 % 79,366.73

Nilai HSPK : 608,479.00


2.01.01.03.02.004 1 m2 Pekerjaan Pasang Bekisting m2 Nilai HSPK 630,509.00
Untuk Balok (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.033 O.H 130,000 4,290.00
1.10.28.02.01.001.002 Kepala Tukang 0.033 O.H 120,000 3,960.00
1.10.28.02.01.001.004 Tukang Kayu 0.330 O.H 110,000 36,300.00
1.10.28.02.01.002.001 Pekerja 0.660 O.H 90,000 59,400.00
Jumlah Harga Tenaga Kerja 103,950.00
Bahan
1.1.7.01.01.05.002.00038 Kayu Meranti, Begesting 0.040 m3 5,224,650 208,986.00
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.400 Kg 19,550 7,820.00
1.1.7.01.01.04.002.00001 Minyak Pelumas 0.200 liter 43,000 8,600.00
1.1.7.01.01.05.002.00028 Kayu Meranti, Balok, Uk. 6 x 12 x 400 0.018 m3 6,385,700 114,942.60
cm
1.1.7.01.01.05.007.00035 Multipleks Uk. 120 x 240 cm x 9 mm 0.350 Lembar 174,200 60,970.00

1.1.7.01.01.05.002.00054 Dolken Kayu, dia. 8-10/400 cm 2.000 Batang 21,500 43,000.00


Jumlah Harga Bahan 444,318.60
Peralatan
Jumlah Harga Peralatan
Jumlah 548,268.60

26
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Overhead & Profit 15 % 82,240.29

Nilai HSPK : 630,509.00


2.01.01.03.02.005 1 m2 Pekerjaan Pasang Bekisting m2 Nilai HSPK 707,379.00
Untuk Lantai (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.033 O.H 130,000 4,290.00
1.10.28.02.01.001.002 Kepala Tukang 0.033 O.H 120,000 3,960.00
1.10.28.02.01.001.004 Tukang Kayu 0.330 O.H 110,000 36,300.00
1.10.28.02.01.002.001 Pekerja 0.660 O.H 90,000 59,400.00
Jumlah Harga Tenaga Kerja 103,950.00
Bahan
1.1.7.01.01.05.002.00038 Kayu Meranti, Begesting 0.040 m3 5,224,650 208,986.00
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.400 Kg 19,550 7,820.00
1.1.7.01.01.04.002.00001 Minyak Pelumas 0.200 liter 43,000 8,600.00
1.1.7.01.01.05.002.00028 Kayu Meranti, Balok, Uk. 6 x 12 x 400 0.015 m3 6,385,700 95,785.50
cm
1.1.7.01.01.05.007.00035 Multipleks Uk. 120 x 240 cm x 9 mm 0.350 Lembar 174,200 60,970.00

1.1.7.01.01.05.002.00054 Dolken Kayu, dia. 8-10/400 cm 6.000 Batang 21,500 129,000.00


Jumlah Harga Bahan 511,161.50
Peralatan
Jumlah Harga Peralatan
Jumlah 615,111.50
Overhead & Profit 15 % 92,266.73

Nilai HSPK : 707,379.00


2.01.01.03.02.006 1 m2 Pekerjaan Pasang Bekisting m2 Nilai HSPK 609,838.00
Untuk Dinding (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.033 O.H 130,000 4,290.00
1.10.28.02.01.001.002 Kepala Tukang 0.033 O.H 120,000 3,960.00
1.10.28.02.01.001.004 Tukang Kayu 0.330 O.H 110,000 36,300.00
1.10.28.02.01.002.001 Pekerja 0.660 O.H 90,000 59,400.00
Jumlah Harga Tenaga Kerja 103,950.00
Bahan
1.1.7.01.01.05.002.00038 Kayu Meranti, Begesting 0.030 m3 5,224,650 156,739.50
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.400 Kg 19,550 7,820.00
1.1.7.01.01.04.002.00001 Minyak Pelumas 0.200 liter 43,000 8,600.00
1.1.7.01.01.05.002.00028 Kayu Meranti, Balok, Uk. 6 x 12 x 400 0.020 m3 6,385,700 127,714.00
cm
1.1.7.01.01.05.007.00035 Multipleks Uk. 120 x 240 cm x 9 mm 0.350 Lembar 174,200 60,970.00

1.1.7.01.01.05.002.00054 Dolken Kayu, dia. 8-10/400 cm 3.000 Batang 21,500 64,500.00


Jumlah Harga Bahan 426,343.50
Peralatan
Jumlah Harga Peralatan
Jumlah 530,293.50
Overhead & Profit 15 % 79,544.03

Nilai HSPK : 609,838.00


2.01.01.03.02.007 1 m2 Pekerjaan Pasang Bekisting m2 Nilai HSPK 545,923.00
Untuk Tangga (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.033 O.H 130,000 4,290.00
1.10.28.02.01.001.002 Kepala Tukang 0.033 O.H 120,000 3,960.00
1.10.28.02.01.001.004 Tukang Kayu 0.330 O.H 110,000 36,300.00
1.10.28.02.01.002.001 Pekerja 0.660 O.H 90,000 59,400.00
Jumlah Harga Tenaga Kerja 103,950.00
Bahan
1.1.7.01.01.05.002.00038 Kayu Meranti, Begesting 0.030 m3 5,224,650 156,739.50
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.400 Kg 19,550 7,820.00
1.1.7.01.01.04.002.00001 Minyak Pelumas 0.150 liter 43,000 6,450.00

27
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
1.1.7.01.01.05.002.00028 Kayu Meranti, Balok, Uk. 6 x 12 x 400 0.015 m3 6,385,700 95,785.50
cm
1.1.7.01.01.05.007.00035 Multipleks Uk. 120 x 240 cm x 9 mm 0.350 Lembar 174,200 60,970.00

1.1.7.01.01.05.002.00054 Dolken Kayu, dia. 8-10/400 cm 2.000 Batang 21,500 43,000.00


Jumlah Harga Bahan 370,765.00
Peralatan
Jumlah Harga Peralatan
Jumlah 474,715.00
Overhead & Profit 15 % 71,207.25

Nilai HSPK : 545,923.00


2.01.01.03.02.008 1 m2 Pekerjaan Pasang Bekisting m2 Nilai HSPK 173,105.00
Untuk Pondasi (2 Kali Pakai) (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.013 O.H 130,000 1,690.00
1.10.28.02.01.001.002 Kepala Tukang 0.013 O.H 120,000 1,560.00
1.10.28.02.01.001.004 Tukang Kayu 0.130 O.H 110,000 14,300.00
1.10.28.02.01.002.001 Pekerja 0.260 O.H 90,000 23,400.00
Jumlah Harga Tenaga Kerja 40,950.00
Bahan
1.1.7.01.01.05.002.00038 Kayu Meranti, Begesting 0.020 m3 5,224,650 104,493.00
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.150 Kg 19,550 2,932.50
1.1.7.01.01.04.002.00001 Minyak Pelumas 0.050 liter 43,000 2,150.00
Jumlah Harga Bahan 109,575.50
Peralatan
Jumlah Harga Peralatan
Jumlah 150,525.50
Overhead & Profit 15 % 22,578.83

Nilai HSPK : 173,105.00


2.01.01.03.02.009 1 m2 Pekerjaan Pasang Bekisting m2 Nilai HSPK 188,126.00
Untuk Sloof (2 Kali Pakai) (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.013 O.H 130,000 1,690.00
1.10.28.02.01.001.002 Kepala Tukang 0.013 O.H 120,000 1,560.00
1.10.28.02.01.001.004 Tukang Kayu 0.130 O.H 110,000 14,300.00
1.10.28.02.01.002.001 Pekerja 0.260 O.H 90,000 23,400.00
Jumlah Harga Tenaga Kerja 40,950.00
Bahan
1.1.7.01.01.05.002.00038 Kayu Meranti, Begesting 0.023 m3 5,224,650 117,554.63
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.150 Kg 19,550 2,932.50
1.1.7.01.01.04.002.00001 Minyak Pelumas 0.050 liter 43,000 2,150.00
Jumlah Harga Bahan 122,637.13
Peralatan
Jumlah Harga Peralatan
Jumlah 163,587.13
Overhead & Profit 15 % 24,538.07

Nilai HSPK : 188,126.00


2.01.01.03.02.010 1 m2 pekerjaan pasang bekisting m2 Nilai HSPK 304,240.00
untuk kolom (2 kali pakai) (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.017 O.H 130,000 2,145.00
1.10.28.02.01.001.002 Kepala Tukang 0.017 O.H 120,000 1,980.00
1.10.28.02.01.001.004 Tukang Kayu 0.165 O.H 110,000 18,150.00
1.10.28.02.01.002.001 Pekerja 0.330 O.H 90,000 29,700.00
Jumlah Harga Tenaga Kerja 51,975.00
Bahan
1.1.7.01.01.05.002.00038 Kayu Meranti, Begesting 0.020 m3 5,224,650 104,493.00
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.200 Kg 19,550 3,910.00

28
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
1.1.7.01.01.04.002.00001 Minyak Pelumas 0.100 liter 43,000 4,300.00
1.1.7.01.01.05.002.00028 Kayu Meranti, Balok, Uk. 6 x 12 x 400 0.008 m3 6,385,700 47,892.75
cm
1.1.7.01.01.05.007.00035 Multipleks Uk. 120 x 240 cm x 9 mm 0.175 Lembar 174,200 30,485.00

1.1.7.01.01.05.002.00054 Dolken Kayu, dia. 8-10/400 cm 1.000 Batang 21,500 21,500.00


Jumlah Harga Bahan 212,580.75
Peralatan
Jumlah Harga Peralatan
Jumlah 264,555.75
Overhead & Profit 15 % 39,683.36

Nilai HSPK : 304,240.00


2.01.01.03.02.011 1 m2 Pekerjaan Pasang Bekisting m2 Nilai HSPK 315,255.00
Untuk Balok (2 Kali Pakai) (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.017 O.H 130,000 2,145.00
1.10.28.02.01.001.002 Kepala Tukang 0.017 O.H 120,000 1,980.00
1.10.28.02.01.001.004 Tukang Kayu 0.165 O.H 110,000 18,150.00
1.10.28.02.01.002.001 Pekerja 0.330 O.H 90,000 29,700.00
Jumlah Harga Tenaga Kerja 51,975.00
Bahan
1.1.7.01.01.05.002.00038 Kayu Meranti, Begesting 0.020 m3 5,224,650 104,493.00
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.200 Kg 19,550 3,910.00
1.1.7.01.01.04.002.00001 Minyak Pelumas 0.100 liter 43,000 4,300.00
1.1.7.01.01.05.002.00028 Kayu Meranti, Balok, Uk. 6 x 12 x 400 0.009 m3 6,385,700 57,471.30
cm
1.1.7.01.01.05.007.00035 Multipleks Uk. 120 x 240 cm x 9 mm 0.175 Lembar 174,200 30,485.00

1.1.7.01.01.05.002.00054 Dolken Kayu, dia. 8-10/400 cm 1.000 Batang 21,500 21,500.00


Jumlah Harga Bahan 222,159.30
Peralatan
Jumlah Harga Peralatan
Jumlah 274,134.30
Overhead & Profit 15 % 41,120.15

Nilai HSPK : 315,255.00


2.01.01.03.02.012 1 m2 Pekerjaan Pasang Bekisting m2 Nilai HSPK 353,690.00
Untuk Lantai (2 Kali Pakai) (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.017 O.H 130,000 2,145.00
1.10.28.02.01.001.002 Kepala Tukang 0.017 O.H 120,000 1,980.00
1.10.28.02.01.001.004 Tukang Kayu 0.165 O.H 110,000 18,150.00
1.10.28.02.01.002.001 Pekerja 0.330 O.H 90,000 29,700.00
Jumlah Harga Tenaga Kerja 51,975.00
Bahan
1.1.7.01.01.05.002.00038 Kayu Meranti, Begesting 0.020 m3 5,224,650 104,493.00
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.200 Kg 19,550 3,910.00
1.1.7.01.01.04.002.00001 Minyak Pelumas 0.100 liter 43,000 4,300.00
1.1.7.01.01.05.002.00028 Kayu Meranti, Balok, Uk. 6 x 12 x 400 0.008 m3 6,385,700 47,892.75
cm
1.1.7.01.01.05.007.00035 Multipleks Uk. 120 x 240 cm x 9 mm 0.175 Lembar 174,200 30,485.00

1.1.7.01.01.05.002.00054 Dolken Kayu, dia. 8-10/400 cm 3.000 Batang 21,500 64,500.00


Jumlah Harga Bahan 255,580.75
Peralatan
Jumlah Harga Peralatan
Jumlah 307,555.75
Overhead & Profit 15 % 46,133.36

Nilai HSPK : 353,690.00

29
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
2.01.01.03.02.013 1 m2 Pekerjaan Pasang Bekisting m2 Nilai HSPK 304,919.00
Untuk Dinding (2 Kali Pakai) (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.017 O.H 130,000 2,145.00
1.10.28.02.01.001.002 Kepala Tukang 0.017 O.H 120,000 1,980.00
1.10.28.02.01.001.004 Tukang Kayu 0.165 O.H 110,000 18,150.00
1.10.28.02.01.002.001 Pekerja 0.330 O.H 90,000 29,700.00
Jumlah Harga Tenaga Kerja 51,975.00
Bahan
1.1.7.01.01.05.002.00038 Kayu Meranti, Begesting 0.015 m3 5,224,650 78,369.75
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.200 Kg 19,550 3,910.00
1.1.7.01.01.04.002.00001 Minyak Pelumas 0.100 liter 43,000 4,300.00
1.1.7.01.01.05.002.00028 Kayu Meranti, Balok, Uk. 6 x 12 x 400 0.010 m3 6,385,700 63,857.00
cm
1.1.7.01.01.05.007.00035 Multipleks Uk. 120 x 240 cm x 9 mm 0.175 Lembar 174,200 30,485.00

1.1.7.01.01.05.002.00054 Dolken Kayu, dia. 8-10/400 cm 1.500 Batang 21,500 32,250.00


Jumlah Harga Bahan 213,171.75
Peralatan
Jumlah Harga Peralatan
Jumlah 265,146.75
Overhead & Profit 15 % 39,772.01

Nilai HSPK : 304,919.00


2.01.01.03.02.014 1 m2 Pekerjaan Pasang Bekisting m2 Nilai HSPK 272,962.00
Untuk Tangga (2 Kali Pakai) (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.017 O.H 130,000 2,145.00
1.10.28.02.01.001.002 Kepala Tukang 0.017 O.H 120,000 1,980.00
1.10.28.02.01.001.004 Tukang Kayu 0.165 O.H 110,000 18,150.00
1.10.28.02.01.002.001 Pekerja 0.330 O.H 90,000 29,700.00
Jumlah Harga Tenaga Kerja 51,975.00
Bahan
1.1.7.01.01.05.002.00038 Kayu Meranti, Begesting 0.015 m3 5,224,650 78,369.75
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.200 Kg 19,550 3,910.00
1.1.7.01.01.04.002.00001 Minyak Pelumas 0.075 liter 43,000 3,225.00
1.1.7.01.01.05.002.00028 Kayu Meranti, Balok, Uk. 6 x 12 x 400 0.008 m3 6,385,700 47,892.75
cm
1.1.7.01.01.05.007.00035 Multipleks Uk. 120 x 240 cm x 9 mm 0.175 Lembar 174,200 30,485.00

1.1.7.01.01.05.002.00054 Dolken Kayu, dia. 8-10/400 cm 1.000 Batang 21,500 21,500.00


Jumlah Harga Bahan 185,382.50
Peralatan
Jumlah Harga Peralatan
Jumlah 237,357.50
Overhead & Profit 15 % 35,603.63

Nilai HSPK : 272,962.00


2.01.01.03.02.015 1 m2 Pekerjaan Pasang Bekisting m2 Nilai HSPK 115,828.00
Untuk Pondasi (3 Kali Pakai) (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.009 O.H 130,000 1,131.00
1.10.28.02.01.001.002 Kepala Tukang 0.009 O.H 120,000 1,044.00
1.10.28.02.01.001.004 Tukang Kayu 0.087 O.H 110,000 9,537.00
1.10.28.02.01.002.001 Pekerja 0.173 O.H 90,000 15,606.00
Jumlah Harga Tenaga Kerja 27,318.00
Bahan
1.1.7.01.01.05.002.00038 Kayu Meranti, Begesting 0.013 m3 5,224,650 70,010.31
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.100 Kg 19,550 1,955.00
1.1.7.01.01.04.002.00001 Minyak Pelumas 0.033 liter 43,000 1,436.20
Jumlah Harga Bahan 73,401.51

30
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Peralatan
Jumlah Harga Peralatan
Jumlah 100,719.51
Overhead & Profit 15 % 15,107.93

Nilai HSPK : 115,828.00


2.01.01.03.02.016 1 m2 Pekerjaan Pasang Bekisting m2 Nilai HSPK 125,441.00
Untuk Sloof (3 Kali Pakai) (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.009 O.H 130,000 1,131.00
1.10.28.02.01.001.002 Kepala Tukang 0.009 O.H 120,000 1,044.00
1.10.28.02.01.001.004 Tukang Kayu 0.087 O.H 110,000 9,537.00
1.10.28.02.01.002.001 Pekerja 0.173 O.H 90,000 15,606.00
Jumlah Harga Tenaga Kerja 27,318.00
Bahan
1.1.7.01.01.05.002.00038 Kayu Meranti, Begesting 0.015 m3 5,224,650 78,369.75
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.100 Kg 19,550 1,955.00
1.1.7.01.01.04.002.00001 Minyak Pelumas 0.033 liter 43,000 1,436.20
Jumlah Harga Bahan 81,760.95
Peralatan
Jumlah Harga Peralatan
Jumlah 109,078.95
Overhead & Profit 15 % 16,361.84

Nilai HSPK : 125,441.00


2.01.01.03.02.017 1 m2 Pekerjaan Pasang Bekisting m2 Nilai HSPK 203,238.00
Untuk Kolom (3 Kali Pakai) (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.011 O.H 130,000 1,430.00
1.10.28.02.01.001.002 Kepala Tukang 0.011 O.H 120,000 1,320.00
1.10.28.02.01.001.004 Tukang Kayu 0.110 O.H 110,000 12,100.00
1.10.28.02.01.002.001 Pekerja 0.220 O.H 90,000 19,800.00
Jumlah Harga Tenaga Kerja 34,650.00
Bahan
1.1.7.01.01.05.002.00038 Kayu Meranti, Begesting 0.013 m3 5,224,650 70,010.31
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.133 Kg 19,550 2,607.97
1.1.7.01.01.04.002.00001 Minyak Pelumas 0.067 liter 43,000 2,868.10
1.1.7.01.01.05.002.00028 Kayu Meranti, Balok, Uk. 6 x 12 x 400 0.005 m3 6,385,700 31,928.50
cm
1.1.7.01.01.05.007.00035 Multipleks Uk. 120 x 240 cm x 9 mm 0.117 Lembar 174,200 20,329.14

1.1.7.01.01.05.002.00054 Dolken Kayu, dia. 8-10/400 cm 0.667 Batang 21,500 14,334.05


Jumlah Harga Bahan 142,078.07
Peralatan
Jumlah Harga Peralatan
Jumlah 176,728.07
Overhead & Profit 15 % 26,509.21

Nilai HSPK : 203,238.00


2.01.01.03.02.018 1 m2 Pekerjaan Pasang Bekisting m2 Nilai HSPK 210,581.00
Untuk Balok (3 Kali Pakai) (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.011 O.H 130,000 1,430.00
1.10.28.02.01.001.002 Kepala Tukang 0.011 O.H 120,000 1,320.00
1.10.28.02.01.001.004 Tukang Kayu 0.110 O.H 110,000 12,100.00
1.10.28.02.01.002.001 Pekerja 0.220 O.H 90,000 19,800.00
Jumlah Harga Tenaga Kerja 34,650.00
Bahan
1.1.7.01.01.05.002.00038 Kayu Meranti, Begesting 0.013 m3 5,224,650 70,010.31
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.133 Kg 19,550 2,607.97
1.1.7.01.01.04.002.00001 Minyak Pelumas 0.067 liter 43,000 2,868.10

31
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
1.1.7.01.01.05.002.00028 Kayu Meranti, Balok, Uk. 6 x 12 x 400 0.006 m3 6,385,700 38,314.20
cm
1.1.7.01.01.05.007.00035 Multipleks Uk. 120 x 240 cm x 9 mm 0.117 Lembar 174,200 20,329.14

1.1.7.01.01.05.002.00054 Dolken Kayu, dia. 8-10/400 cm 0.667 Batang 21,500 14,334.05


Jumlah Harga Bahan 148,463.77
Peralatan
Jumlah Harga Peralatan
Jumlah 183,113.77
Overhead & Profit 15 % 27,467.07

Nilai HSPK : 210,581.00


2.01.01.03.02.019 1 m2 Pekerjaan Pasang Bekisting m2 Nilai HSPK 236,204.00
Untuk Lantai (3 Kali Pakai) (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.011 O.H 130,000 1,430.00
1.10.28.02.01.001.002 Kepala Tukang 0.011 O.H 120,000 1,320.00
1.10.28.02.01.001.004 Tukang Kayu 0.110 O.H 110,000 12,100.00
1.10.28.02.01.002.001 Pekerja 0.220 O.H 90,000 19,800.00
Jumlah Harga Tenaga Kerja 34,650.00
Bahan
1.1.7.01.01.05.002.00038 Kayu Meranti, Begesting 0.013 m3 5,224,650 70,010.31
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.133 Kg 19,550 2,607.97
1.1.7.01.01.04.002.00001 Minyak Pelumas 0.067 liter 43,000 2,868.10
1.1.7.01.01.05.002.00028 Kayu Meranti, Balok, Uk. 6 x 12 x 400 0.005 m3 6,385,700 31,928.50
cm
1.1.7.01.01.05.007.00035 Multipleks Uk. 120 x 240 cm x 9 mm 0.117 Lembar 174,200 20,329.14

1.1.7.01.01.05.002.00054 Dolken Kayu, dia. 8-10/400 cm 2.000 Batang 21,500 43,000.00


Jumlah Harga Bahan 170,744.02
Peralatan
Jumlah Harga Peralatan
Jumlah 205,394.02
Overhead & Profit 15 % 30,809.10

Nilai HSPK : 236,204.00


2.01.01.03.02.020 1 m2 Pekerjaan Pasang Bekisting m2 Nilai HSPK 203,534.00
Untuk Dinding (3 Kali Pakai) (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.011 O.H 130,000 1,430.00
1.10.28.02.01.001.002 Kepala Tukang 0.011 O.H 120,000 1,320.00
1.10.28.02.01.001.004 Tukang Kayu 0.110 O.H 110,000 12,100.00
1.10.28.02.01.002.001 Pekerja 0.220 O.H 90,000 19,800.00
Jumlah Harga Tenaga Kerja 34,650.00
Bahan
1.1.7.01.01.05.002.00038 Kayu Meranti, Begesting 0.010 m3 5,224,650 52,246.50
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.133 Kg 19,550 2,607.97
1.1.7.01.01.04.002.00001 Minyak Pelumas 0.067 liter 43,000 2,868.10
1.1.7.01.01.05.002.00028 Kayu Meranti, Balok, Uk. 6 x 12 x 400 0.007 m3 6,385,700 42,784.19
cm
1.1.7.01.01.05.007.00035 Multipleks Uk. 120 x 240 cm x 9 mm 0.117 Lembar 174,200 20,329.14

1.1.7.01.01.05.002.00054 Dolken Kayu, dia. 8-10/400 cm 1.000 Batang 21,500 21,500.00


Jumlah Harga Bahan 142,335.90
Peralatan
Jumlah Harga Peralatan
Jumlah 176,985.90
Overhead & Profit 15 % 26,547.89

Nilai HSPK : 203,534.00

32
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
2.01.01.03.02.021 1 m2 Pekerjaan Pasang Bekisting m2 Nilai HSPK 181,984.00
Untuk Tangga (3 Kali Pakai) (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.011 O.H 130,000 1,430.00
1.10.28.02.01.001.002 Kepala Tukang 0.011 O.H 120,000 1,320.00
1.10.28.02.01.001.004 Tukang Kayu 0.110 O.H 110,000 12,100.00
1.10.28.02.01.002.001 Pekerja 0.220 O.H 90,000 19,800.00
Jumlah Harga Tenaga Kerja 34,650.00
Bahan
1.1.7.01.01.05.002.00038 Kayu Meranti, Begesting 0.010 m3 5,224,650 52,246.50
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.133 Kg 19,550 2,607.97
1.1.7.01.01.04.002.00001 Minyak Pelumas 0.050 liter 43,000 2,150.00
1.1.7.01.01.05.002.00028 Kayu Meranti, Balok, Uk. 6 x 12 x 400 0.005 m3 6,385,700 31,928.50
cm
1.1.7.01.01.05.007.00035 Multipleks Uk. 120 x 240 cm x 9 mm 0.117 Lembar 174,200 20,329.14

1.1.7.01.01.05.002.00054 Dolken Kayu, dia. 8-10/400 cm 0.667 Batang 21,500 14,334.05


Jumlah Harga Bahan 123,596.16
Peralatan
Jumlah Harga Peralatan
Jumlah 158,246.16
Overhead & Profit 15 % 23,736.92

Nilai HSPK : 181,984.00


2.01.01.03.02.022 1 m2 Pekerjaan Pasang Bekisting m2 Nilai HSPK 111,372.00
Untuk Beton Praktis (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.026 O.H 130,000 3,380.00
1.10.28.02.01.001.002 Kepala Tukang 0.026 O.H 120,000 3,120.00
1.10.28.02.01.001.004 Tukang Kayu 0.260 O.H 110,000 28,600.00
1.10.28.02.01.002.001 Pekerja 0.520 O.H 90,000 46,800.00
Jumlah Harga Tenaga Kerja 81,900.00
Bahan
1.1.7.01.01.05.002.00038 Kayu Meranti, Begesting 0.002 m3 5,224,650 10,449.30
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.010 Kg 19,550 195.50
1.1.7.01.01.04.002.00001 Minyak Bekisting 0.100 liter 43,000 4,300.00
Jumlah Harga Bahan 14,944.80
Peralatan
Jumlah Harga Peralatan
Jumlah 96,844.80
Overhead & Profit 15 % 14,526.72

Nilai HSPK : 111,372.00


2.01.01.04 D. PEKERJAAN PASANGAN DINDING
DAN PLESTERAN
2.01.01.04.01 Pekerjaan Dinding
2.01.01.04.01.001 1 m2 Pekerjaan Pemasangan Batu m2 Nilai HSPK 321,547.00
Merah Tbl 1 Bata (1 Pc : 2 Ps) (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.030 O.H 130,000 3,900.00
1.10.28.02.01.001.002 Kepala Tukang 0.020 O.H 120,000 2,400.00
1.10.28.02.01.001.006 Tukang Batu 0.200 O.H 110,000 22,000.00
1.10.28.02.01.002.001 Pekerja 0.600 O.H 90,000 54,000.00
Jumlah Harga Tenaga Kerja 82,300.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 43.500 Kg 1,306 56,817.81
1.1.7.01.01.01.004.00002 Pasir Pasang 0.080 m3 232,250 18,580.00
1.1.7.01.01.01.005.00010 Batu Bata Merah, Kelas 1 140.000 Buah 871 121,907.94
Jumlah Harga Bahan 197,305.75
Peralatan
Jumlah Harga Peralatan

33
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Jumlah 279,605.75
Overhead & Profit 15 % 41,940.86

Nilai HSPK : 321,547.00


2.01.01.04.01.002 1 m2 Pekerjaan Pemasangan Batu m2 Nilai HSPK 156,037.00
Merah Tbl 1/2 Bata (1 Pc : 2 Ps) (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.015 O.H 130,000 1,950.00
1.10.28.02.01.001.002 Kepala Tukang 0.010 O.H 120,000 1,200.00
1.10.28.02.01.001.006 Tukang Batu 0.100 O.H 110,000 11,000.00
1.10.28.02.01.002.001 Pekerja 0.300 O.H 90,000 27,000.00
Jumlah Harga Tenaga Kerja 41,150.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 18.952 Kg 1,306 24,754.28
1.1.7.01.01.01.004.00002 Pasir Pasang 0.038 m3 232,250 8,825.50
1.1.7.01.01.01.005.00010 Batu Bata Merah, Kelas 1 70.000 Buah 871 60,953.97
Jumlah Harga Bahan 94,533.75
Peralatan
Jumlah Harga Peralatan
Jumlah 135,683.75
Overhead & Profit 15 % 20,352.56

Nilai HSPK : 156,037.00


2.01.01.04.01.003 1 m2 Pekerjaan Pemasangan Batu m2 Nilai HSPK 308,641.00
Merah Tebal 1 Bata (1 Pc : 3 Ps) (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.030 O.H 130,000 3,900.00
1.10.28.02.01.001.002 Kepala Tukang 0.020 O.H 120,000 2,400.00
1.10.28.02.01.001.006 Tukang Batu 0.200 O.H 110,000 22,000.00
1.10.28.02.01.002.001 Pekerja 0.600 O.H 90,000 54,000.00
Jumlah Harga Tenaga Kerja 82,300.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 32.952 Kg 1,306 43,040.47
1.1.7.01.01.01.004.00002 Pasir Pasang 0.091 m3 232,250 21,134.75
1.1.7.01.01.01.005.00010 Batu Bata Merah, Kelas 1 140.000 Buah 871 121,907.94
Jumlah Harga Bahan 186,083.16
Peralatan
Jumlah Harga Peralatan
Jumlah 268,383.16
Overhead & Profit 15 % 40,257.47

Nilai HSPK : 308,641.00


2.01.01.04.01.004 1 m2 Pekerjaan Pemasangan Batu m2 Nilai HSPK 149,691.00
Merah Tebal 1/2 Bata (1 Pc : 3 Ps) (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.015 O.H 130,000 1,950.00
1.10.28.02.01.001.002 Kepala Tukang 0.010 O.H 120,000 1,200.00
1.10.28.02.01.001.006 Tukang Batu 0.100 O.H 110,000 11,000.00
1.10.28.02.01.002.001 Pekerja 0.300 O.H 90,000 27,000.00
Jumlah Harga Tenaga Kerja 41,150.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 14.372 Kg 1,306 18,772.08
1.1.7.01.01.01.004.00002 Pasir Pasang 0.040 m3 232,250 9,290.00
1.1.7.01.01.01.005.00010 Batu Bata Merah, Kelas 1 70.000 Buah 871 60,953.97
Jumlah Harga Bahan 89,016.05
Peralatan
Jumlah Harga Peralatan
Jumlah 130,166.05
Overhead & Profit 15 % 19,524.91

Nilai HSPK : 149,691.00

34
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
2.01.01.04.01.005 1 m2 Pekerjaan Pemasangan Batu m2 Nilai HSPK 299,562.00
Merah Tebal 1 Bata (1 Pc : 4 Ps) (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.030 O.H 130,000 3,900.00
1.10.28.02.01.001.002 Kepala Tukang 0.020 O.H 120,000 2,400.00
1.10.28.02.01.001.006 Tukang Batu 0.200 O.H 110,000 22,000.00
1.10.28.02.01.002.001 Pekerja 0.600 O.H 90,000 54,000.00
Jumlah Harga Tenaga Kerja 82,300.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 26.552 Kg 1,306 34,681.07
1.1.7.01.01.01.004.00002 Pasir Pasang 0.093 m3 232,250 21,599.25
1.1.7.01.01.01.005.00010 Batu Bata Merah, Kelas 1 140.000 Buah 871 121,907.94
Jumlah Harga Bahan 178,188.26
Peralatan
Jumlah Harga Peralatan
Jumlah 260,488.26
Overhead & Profit 15 % 39,073.24

Nilai HSPK : 299,562.00


2.01.01.04.01.006 1 m2 Pekerjaan Pemasangan Batu m2 Nilai HSPK 146,179.00
Merah Tebal 1/2 Bata (1 Pc : 4 Ps) (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.015 O.H 130,000 1,950.00
1.10.28.02.01.001.002 Kepala Tukang 0.010 O.H 120,000 1,200.00
1.10.28.02.01.001.006 Tukang Batu 0.100 O.H 110,000 11,000.00
1.10.28.02.01.002.001 Pekerja 0.300 O.H 90,000 27,000.00
Jumlah Harga Tenaga Kerja 41,150.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 11.500 Kg 1,306 15,020.80
1.1.7.01.01.01.004.00002 Pasir Pasang 0.043 m3 232,250 9,986.75
1.1.7.01.01.01.005.00010 Batu Bata Merah, Kelas 1 70.000 Buah 871 60,953.97
Jumlah Harga Bahan 85,961.52
Peralatan
Jumlah Harga Peralatan
Jumlah 127,111.52
Overhead & Profit 15 % 19,066.73

Nilai HSPK : 146,179.00


2.01.01.04.01.007 1 m2 Pekerjaan Pemasangan Batu m2 Nilai HSPK 295,429.00
Merah Tebal 1 Bata (1 Pc : 5 Ps) (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.030 O.H 130,000 3,900.00
1.10.28.02.01.001.002 Kepala Tukang 0.020 O.H 120,000 2,400.00
1.10.28.02.01.001.006 Tukang Batu 0.200 O.H 110,000 22,000.00
1.10.28.02.01.002.001 Pekerja 0.600 O.H 90,000 54,000.00
Jumlah Harga Tenaga Kerja 82,300.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 22.200 Kg 1,306 28,996.67
1.1.7.01.01.01.004.00002 Pasir Pasang 0.102 m3 232,250 23,689.50
1.1.7.01.01.01.005.00010 Batu Bata Merah, Kelas 1 140.000 Buah 871 121,907.94
Jumlah Harga Bahan 174,594.11
Peralatan
Jumlah Harga Peralatan
Jumlah 256,894.11
Overhead & Profit 15 % 38,534.12

Nilai HSPK : 295,429.00


2.01.01.04.01.008 1 m2 Pekerjaan Pemasangan Batu m2 Nilai HSPK 143,979.00
Merah Tebal 1/2 Bata (1 Pc : 5 Ps) (dibulatkan) :

Tenaga Kerja

35
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
1.10.28.02.01.001.001 Mandor 0.015 O.H 130,000 1,950.00
1.10.28.02.01.001.002 Kepala Tukang 0.010 O.H 120,000 1,200.00
1.10.28.02.01.001.006 Tukang Batu 0.100 O.H 110,000 11,000.00
1.10.28.02.01.002.001 Pekerja 0.300 O.H 90,000 27,000.00
1.1.7.01.01.01.002.00001 Semen Portland 9.680 Kg 1,306 12,643.59
Jumlah Harga Tenaga Kerja 53,793.59
Bahan
1.1.7.01.01.01.004.00002 Pasir Pasang 0.045 m3 232,250 10,451.25
1.1.7.01.01.01.005.00010 Batu Bata Merah, Kelas 1 70.000 Buah 871 60,953.97
Jumlah Harga Bahan 71,405.22
Peralatan
Jumlah Harga Peralatan
Jumlah 125,198.81
Overhead & Profit 15 % 18,779.82

Nilai HSPK : 143,979.00


2.01.01.04.01.009 1 m2 Pekerjaan Pemasangan Batu m2 Nilai HSPK 295,213.00
Merah Tebal 1 Bata (1 Pc : 6 Ps) (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.030 O.H 130,000 3,900.00
1.10.28.02.01.001.002 Kepala Tukang 0.020 O.H 120,000 2,400.00
1.10.28.02.01.001.006 Tukang Batu 0.200 O.H 110,000 22,000.00
1.10.28.02.01.002.001 Pekerja 0.600 O.H 90,000 54,000.00
Jumlah Harga Tenaga Kerja 82,300.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 18.500 Kg 1,306 24,163.90
1.1.7.01.01.01.004.00002 Pasir Pasang 0.122 m3 232,250 28,334.50
1.1.7.01.01.01.005.00010 Batu Bata Merah, Kelas 1 140.000 Buah 871 121,907.94
Jumlah Harga Bahan 174,406.34
Peralatan
Jumlah Harga Peralatan
Jumlah 256,706.34
Overhead & Profit 15 % 38,505.95

Nilai HSPK : 295,213.00


2.01.01.04.01.010 1 m2 Pekerjaan Pemasangan Batu m2 Nilai HSPK 143,005.00
Merah Tebal 1/2 Bata (1 Pc : 6 Ps) (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.015 O.H 130,000 1,950.00
1.10.28.02.01.001.002 Kepala Tukang 0.010 O.H 120,000 1,200.00
1.10.28.02.01.001.006 Tukang Batu 0.100 O.H 110,000 11,000.00
1.10.28.02.01.002.001 Pekerja 0.300 O.H 90,000 27,000.00
Jumlah Harga Tenaga Kerja 41,150.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 8.320 Kg 1,306 10,867.22
1.1.7.01.01.01.004.00002 Pasir Pasang 0.049 m3 232,250 11,380.25
1.1.7.01.01.01.005.00010 Batu Bata Merah, Kelas 1 70.000 Buah 871 60,953.97
Jumlah Harga Bahan 83,201.44
Peralatan
Jumlah Harga Peralatan
Jumlah 124,351.44
Overhead & Profit 15 % 18,652.72

Nilai HSPK : 143,005.00


2.01.01.04.01.011 1 m2 Pekerjaan Pemasangan m2 Nilai HSPK 347,724.00
Dinding Terawang (Roster) Ukuran (dibulatkan) :
(12 X 11 X 24) Cm, Campuran Spesi 1
Pc : 3 Pp
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.015 O.H 130,000 1,950.00
1.10.28.02.01.001.002 Kepala Tukang 0.010 O.H 120,000 1,200.00
1.10.28.02.01.001.006 Tukang Batu 0.100 O.H 110,000 11,000.00

36
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
1.10.28.02.01.002.001 Pekerja 0.300 O.H 90,000 27,000.00
Jumlah Harga Tenaga Kerja 41,150.00
Bahan
1.1.7.01.01.01.022.00211 Roster Merah 30.000 buah 7,850 235,500.00
1.1.7.01.01.01.002.00001 Semen Portland 14.000 Kg 1,306 18,286.19
1.1.7.01.01.01.004.00002 Pasir Pasang 0.032 m3 232,250 7,432.00
Jumlah Harga Bahan 261,218.19
Peralatan
Jumlah Harga Peralatan
Jumlah 302,368.19
Overhead & Profit 15 % 45,355.23

Nilai HSPK : 347,724.00


2.01.01.04.01.012 1 m2 Pekerjaan Pemasangan m2 Nilai HSPK 344,019.00
Dinding Terawang (Roster) Ukuran (dibulatkan) :
(12 X 11 X 24) Cm, Campuran Spesi 1
Pc : 4 Pp
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.015 O.H 130,000 1,950.00
1.10.28.02.01.001.002 Kepala Tukang 0.010 O.H 120,000 1,200.00
1.10.28.02.01.001.006 Tukang Batu 0.100 O.H 110,000 11,000.00
1.10.28.02.01.002.001 Pekerja 0.300 O.H 90,000 27,000.00
Jumlah Harga Tenaga Kerja 41,150.00
Bahan
1.1.7.01.01.01.022.00211 Roster Merah 30.000 buah 7,850 235,500.00
1.1.7.01.01.01.002.00001 Semen Portland 11.000 Kg 1,306 14,367.72
1.1.7.01.01.01.004.00002 Pasir Pasang 0.035 m3 232,250 8,128.75
Jumlah Harga Bahan 257,996.47
Peralatan
Jumlah Harga Peralatan
Jumlah 299,146.47
Overhead & Profit 15 % 44,871.97

Nilai HSPK : 344,019.00


2.01.01.04.01.013 1 m2 Pasangan Dinding Bata Ringan m2 Nilai HSPK 357,719.00
Ex. Citicon; Campuran Spesi 1:3 (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.003 O.H 130,000 390.00
1.10.28.02.01.001.002 Kepala Tukang 0.130 O.H 120,000 15,600.00
1.10.28.02.01.001.006 Tukang Batu 1.300 O.H 110,000 143,000.00
1.10.28.02.01.002.001 Pekerja 0.671 O.H 90,000 60,390.00
Jumlah Harga Tenaga Kerja 219,380.00
Bahan
1.1.7.01.01.01.005.00015 Bata Ringan Ex. Citicon 0.113 M3 812,750 91,596.93
1.1.7.01.01.01.002.00001 Semen Portland 0.063 Kg 1,306 82.29
Jumlah Harga Bahan 91,679.21
Peralatan
Jumlah Harga Peralatan
Jumlah 311,059.21
Overhead & Profit 15 % 46,658.88

Nilai HSPK : 357,719.00


2.01.01.04.01.014 1 m2 Pasangan Dinding Bata Ringan m2 Nilai HSPK 357,719.00
Ex. Citicon; Campuran Spesi 1:4 (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.003 O.H 130,000 390.00
1.10.28.02.01.001.002 Kepala Tukang 0.130 O.H 120,000 15,600.00
1.10.28.02.01.001.006 Tukang Batu 1.300 O.H 110,000 143,000.00
1.10.28.02.01.002.001 Pekerja 0.671 O.H 90,000 60,390.00
Jumlah Harga Tenaga Kerja 219,380.00
Bahan
1.1.7.01.01.01.005.00015 Bata Ringan Ex. Citicon 0.113 M3 812,750 91,596.93

37
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
1.1.7.01.01.01.002.00001 Semen Portland 0.063 Kg 1,306 82.29
Jumlah Harga Bahan 91,679.21
Peralatan
Jumlah Harga Peralatan
Jumlah 311,059.21
Overhead & Profit 15 % 46,658.88

Nilai HSPK : 357,719.00


2.01.01.04.02 Pekerjaan Plesteran
2.01.01.04.02.001 1 m2 Pekerjaan Plesteran 1 Pc : 1 Ps m2 Nilai HSPK 81,900.00
Tebal 15 Mm (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.015 O.H 130,000 1,950.00
1.10.28.02.01.001.002 Kepala Tukang 0.015 O.H 120,000 1,800.00
1.10.28.02.01.001.006 Tukang Batu 0.150 O.H 110,000 16,500.00
1.10.28.02.01.002.001 Pekerja 0.300 O.H 90,000 27,000.00
Jumlah Harga Tenaga Kerja 47,250.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 15.504 Kg 1,306 20,250.65
1.1.7.01.01.01.004.00002 Pasir Pasang 0.016 m3 232,250 3,716.00
Jumlah Harga Bahan 23,966.65
Peralatan
Jumlah Harga Peralatan
Jumlah 71,216.65
Overhead & Profit 15 % 10,682.50

Nilai HSPK : 81,900.00


2.01.01.04.02.002 1 m2 Pekerjaan Plesteran 1 Pc : 2 Ps m2 Nilai HSPK 75,037.00
Tebal 15 Mm (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.015 O.H 130,000 1,950.00
1.10.28.02.01.001.002 Kepala Tukang 0.015 O.H 120,000 1,800.00
1.10.28.02.01.001.006 Tukang Batu 0.150 O.H 110,000 16,500.00
1.10.28.02.01.002.001 Pekerja 0.300 O.H 90,000 27,000.00
Jumlah Harga Tenaga Kerja 47,250.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 10.224 Kg 1,306 13,354.14
1.1.7.01.01.01.004.00002 Pasir Pasang 0.020 m3 232,250 4,645.00
Jumlah Harga Bahan 17,999.14
Peralatan
Jumlah Harga Peralatan
Jumlah 65,249.14
Overhead & Profit 15 % 9,787.37

Nilai HSPK : 75,037.00


2.01.01.04.02.003 1 m2 Pekerjaan Plesteran 1 Pc : 3 Ps m2 Nilai HSPK 72,161.00
Tebal 15 Mm (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.015 O.H 130,000 1,950.00
1.10.28.02.01.001.002 Kepala Tukang 0.015 O.H 120,000 1,800.00
1.10.28.02.01.001.006 Tukang Batu 0.150 O.H 110,000 16,500.00
1.10.28.02.01.002.001 Pekerja 0.300 O.H 90,000 27,000.00
Jumlah Harga Tenaga Kerja 47,250.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 7.776 Kg 1,306 10,156.67
1.1.7.01.01.01.004.00002 Pasir Pasang 0.023 m3 232,250 5,341.75
Jumlah Harga Bahan 15,498.42
Peralatan
Jumlah Harga Peralatan
Jumlah 62,748.42
Overhead & Profit 15 % 9,412.26

Nilai HSPK : 72,161.00

38
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
2.01.01.04.02.004 1 m2 Pekerjaan Plesteran 1 Pc : 4 Ps m2 Nilai HSPK 70,121.00
Tebal 15 Mm (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.015 O.H 130,000 1,950.00
1.10.28.02.01.001.002 Kepala Tukang 0.015 O.H 120,000 1,800.00
1.10.28.02.01.001.006 Tukang Batu 0.150 O.H 110,000 16,500.00
1.10.28.02.01.002.001 Pekerja 0.300 O.H 90,000 27,000.00
Jumlah Harga Tenaga Kerja 47,250.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 6.240 Kg 1,306 8,150.42
1.1.7.01.01.01.004.00002 Pasir Pasang 0.024 m3 232,250 5,574.00
Jumlah Harga Bahan 13,724.42
Peralatan
Jumlah Harga Peralatan
Jumlah 60,974.42
Overhead & Profit 15 % 9,146.16

Nilai HSPK : 70,121.00


2.01.01.04.02.005 1 m2 Pekerjaan Plesteran 1 Pc : 5 Ps m2 Nilai HSPK 69,069.00
Tebal 15 Mm (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.015 O.H 130,000 1,950.00
1.10.28.02.01.001.002 Kepala Tukang 0.015 O.H 120,000 1,800.00
1.10.28.02.01.001.006 Tukang Batu 0.150 O.H 110,000 16,500.00
1.10.28.02.01.002.001 Pekerja 0.300 O.H 90,000 27,000.00
Jumlah Harga Tenaga Kerja 47,250.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 5.184 Kg 1,306 6,771.12
1.1.7.01.01.01.004.00002 Pasir Pasang 0.026 m3 232,250 6,038.50
Jumlah Harga Bahan 12,809.62
Peralatan
Jumlah Harga Peralatan
Jumlah 60,059.62
Overhead & Profit 15 % 9,008.94

Nilai HSPK : 69,069.00


2.01.01.04.02.006 1 m2 Pekerjaan Plesteran 1 Pc : 6 Ps m2 Nilai HSPK 68,183.00
Tebal 15 Mm (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.015 O.H 130,000 1,950.00
1.10.28.02.01.001.002 Kepala Tukang 0.015 O.H 120,000 1,800.00
1.10.28.02.01.001.006 Tukang Batu 0.150 O.H 110,000 16,500.00
1.10.28.02.01.002.001 Pekerja 0.300 O.H 90,000 27,000.00
Jumlah Harga Tenaga Kerja 47,250.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 4.416 Kg 1,306 5,767.99
1.1.7.01.01.01.004.00002 Pasir Pasang 0.027 m3 232,250 6,270.75
Jumlah Harga Bahan 12,038.74
Peralatan
Jumlah Harga Peralatan
Jumlah 59,288.74
Overhead & Profit 15 % 8,893.31

Nilai HSPK : 68,183.00


2.01.01.04.02.007 1 m2 Pekerjaan Plesteran 1Pc : ½Kp m2 Nilai HSPK 68,952.00
: 3Pp Tebal 15 Mm (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.018 O.H 130,000 2,340.00
1.10.28.02.01.001.002 Kepala Tukang 0.012 O.H 120,000 1,440.00
1.10.28.02.01.001.006 Tukang Batu 0.120 O.H 110,000 13,200.00
1.10.28.02.01.002.001 Pekerja 0.360 O.H 90,000 32,400.00
Jumlah Harga Tenaga Kerja 49,380.00
Bahan

39
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
1.1.7.01.01.01.002.00001 Semen Portland 5.760 Kg 1,306 7,523.46
1.1.7.01.01.01.002.00011 Kapur Pasang 0.003 m3 11,650 34.95
1.1.7.01.01.01.004.00002 Pasir Pasang 0.013 m3 232,250 3,019.25
Jumlah Harga Bahan 10,577.66
Peralatan
Jumlah Harga Peralatan
Jumlah 59,957.66
Overhead & Profit 15 % 8,993.65

Nilai HSPK : 68,952.00


2.01.01.04.02.008 1 m2 Pekerjaan Plesteran 1 Pc : 2 Ps m2 Nilai HSPK 100,437.00
Tebal 20 Mm (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.022 O.H 130,000 2,860.00
1.10.28.02.01.001.002 Kepala Tukang 0.020 O.H 120,000 2,400.00
1.10.28.02.01.001.006 Tukang Batu 0.200 O.H 110,000 22,000.00
1.10.28.02.01.002.001 Pekerja 0.400 O.H 90,000 36,000.00
Jumlah Harga Tenaga Kerja 63,260.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 13.632 Kg 1,306 17,805.53
1.1.7.01.01.01.004.00002 Pasir Pasang 0.027 m3 232,250 6,270.75
Jumlah Harga Bahan 24,076.28
Peralatan
Jumlah Harga Peralatan
Jumlah 87,336.28
Overhead & Profit 15 % 13,100.44

Nilai HSPK : 100,437.00


2.01.01.04.02.009 1 m2 Pekerjaan Plesteran 1 Pc : 3 Ps m2 Nilai HSPK 96,603.00
Tebal 20 Mm (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.022 O.H 130,000 2,860.00
1.10.28.02.01.001.002 Kepala Tukang 0.020 O.H 120,000 2,400.00
1.10.28.02.01.001.006 Tukang Batu 0.200 O.H 110,000 22,000.00
1.10.28.02.01.002.001 Pekerja 0.400 O.H 90,000 36,000.00
Jumlah Harga Tenaga Kerja 63,260.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 10.368 Kg 1,306 13,542.23
1.1.7.01.01.01.004.00002 Pasir Pasang 0.031 m3 232,250 7,199.75
Jumlah Harga Bahan 20,741.98
Peralatan
Jumlah Harga Peralatan
Jumlah 84,001.98
Overhead & Profit 15 % 12,600.30

Nilai HSPK : 96,603.00


2.01.01.04.02.010 1 m2 Pekerjaan Plesteran 1 Pc : 4 Ps m2 Nilai HSPK 93,794.00
Tebal 20 Mm (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.022 O.H 130,000 2,860.00
1.10.28.02.01.001.002 Kepala Tukang 0.020 O.H 120,000 2,400.00
1.10.28.02.01.001.006 Tukang Batu 0.200 O.H 110,000 22,000.00
1.10.28.02.01.002.001 Pekerja 0.400 O.H 90,000 36,000.00
Jumlah Harga Tenaga Kerja 63,260.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 8.320 Kg 1,306 10,867.22
1.1.7.01.01.01.004.00002 Pasir Pasang 0.032 m3 232,250 7,432.00
Jumlah Harga Bahan 18,299.22
Peralatan
Jumlah Harga Peralatan
Jumlah 81,559.22
Overhead & Profit 15 % 12,233.88

Nilai HSPK : 93,794.00

40
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
2.01.01.04.02.011 1 m2 Pekerjaan Plesteran 1 Pc : 5 Ps m2 Nilai HSPK 92,480.00
Tebal 20 Mm (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.022 O.H 130,000 2,860.00
1.10.28.02.01.001.002 Kepala Tukang 0.020 O.H 120,000 2,400.00
1.10.28.02.01.001.006 Tukang Batu 0.200 O.H 110,000 22,000.00
1.10.28.02.01.002.001 Pekerja 0.400 O.H 90,000 36,000.00
Jumlah Harga Tenaga Kerja 63,260.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 6.912 Kg 1,306 9,028.15
1.1.7.01.01.01.004.00002 Pasir Pasang 0.035 m3 232,250 8,128.75
Jumlah Harga Bahan 17,156.90
Peralatan
Jumlah Harga Peralatan
Jumlah 80,416.90
Overhead & Profit 15 % 12,062.54

Nilai HSPK : 92,480.00


2.01.01.04.02.012 1 m2 Pekerjaan Plesteran 1 Pc : 6 Ps m2 Nilai HSPK 91,209.00
Tebal 20 Mm (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.022 O.H 130,000 2,860.00
1.10.28.02.01.001.002 Kepala Tukang 0.020 O.H 120,000 2,400.00
1.10.28.02.01.001.006 Tukang Batu 0.200 O.H 110,000 22,000.00
1.10.28.02.01.002.001 Pekerja 0.400 O.H 90,000 36,000.00
Jumlah Harga Tenaga Kerja 63,260.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 5.888 Kg 1,306 7,690.65
1.1.7.01.01.01.004.00002 Pasir Pasang 0.036 m3 232,250 8,361.00
Jumlah Harga Bahan 16,051.65
Peralatan
Jumlah Harga Peralatan
Jumlah 79,311.65
Overhead & Profit 15 % 11,896.75

Nilai HSPK : 91,209.00


2.01.01.04.02.013 1 m2 Pekerjaan berapen 1SP : 5PP m2 Nilai HSPK 42,044.00
tebal 15 mm (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.008 O.H 130,000 1,040.00
1.10.28.02.01.001.002 Kepala Tukang 0.008 O.H 120,000 960.00
1.10.28.02.01.001.006 Tukang Batu 0.075 O.H 110,000 8,250.00
1.10.28.02.01.002.001 Pekerja 0.150 O.H 90,000 13,500.00
Jumlah Harga Tenaga Kerja 23,750.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 5.184 Kg 1,306 6,771.12
1.1.7.01.01.01.004.00002 Pasir Pasang 0.026 m3 232,250 6,038.50
Jumlah Harga Bahan 12,809.62
Peralatan
Jumlah Harga Peralatan
Jumlah 36,559.62
Overhead & Profit 15 % 5,483.94

Nilai HSPK : 42,044.00


2.01.01.04.02.014 1 m' Pekerjaan Plesteran Skoning m' Nilai HSPK 69,222.00
1Pc : 3Ps Lebar 10 Cm (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.004 O.H 130,000 520.00
1.10.28.02.01.001.002 Kepala Tukang 0.040 O.H 120,000 4,800.00
1.10.28.02.01.001.006 Tukang Batu 0.400 O.H 110,000 44,000.00
1.10.28.02.01.002.001 Pekerja 0.080 O.H 90,000 7,200.00
Jumlah Harga Tenaga Kerja 56,520.00
Bahan

41
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
1.1.7.01.01.01.002.00001 Semen Portland 0.500 Kg 1,306 653.08
1.1.7.01.01.01.004.00002 Pasir Pasang 0.013 m3 232,250 3,019.25
Jumlah Harga Bahan 3,672.33
Peralatan
Jumlah Harga Peralatan
Jumlah 60,192.33
Overhead & Profit 15 % 9,028.85

Nilai HSPK : 69,222.00


2.01.01.04.02.015 1 m' Pekerjaan Benangan m' Nilai HSPK 23,682.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.004 O.H 130,000 520.00
1.10.28.02.01.001.002 Kepala Tukang 0.040 O.H 120,000 4,800.00
1.10.28.02.01.001.006 Tukang Batu 0.040 O.H 110,000 4,400.00
1.10.28.02.01.002.001 Pekerja 0.080 O.H 90,000 7,200.00
Jumlah Harga Tenaga Kerja 16,920.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 0.500 Kg 1,306 653.08
1.1.7.01.01.01.004.00002 Pasir Pasang 0.013 m3 232,250 3,019.25
Jumlah Harga Bahan 3,672.33
Peralatan
Jumlah Harga Peralatan
Jumlah 20,592.33
Overhead & Profit 15 % 3,088.85

Nilai HSPK : 23,682.00


2.01.01.04.02.016 1 m2 Pekerjaan Plesteran Ciprat m2 Nilai HSPK 55,415.00
1Pc:2Ps (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.015 O.H 130,000 1,950.00
1.10.28.02.01.001.002 Kepala Tukang 0.010 O.H 120,000 1,200.00
1.10.28.02.01.001.006 Tukang Batu 0.100 O.H 110,000 11,000.00
1.10.28.02.01.002.001 Pekerja 0.300 O.H 90,000 27,000.00
Jumlah Harga Tenaga Kerja 41,150.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 4.320 Kg 1,306 5,642.60
1.1.7.01.01.01.004.00002 Pasir Pasang 0.006 m3 232,250 1,393.50
Jumlah Harga Bahan 7,036.10
Peralatan
Jumlah Harga Peralatan
Jumlah 48,186.10
Overhead & Profit 15 % 7,227.91

Nilai HSPK : 55,415.00


2.01.01.04.02.017 1 m2 Pekerjaan Finishing Siar m2 Nilai HSPK 31,981.00
Pasangan Batu Bata Merah, Kelas 1 (dibulatkan) :
Merah
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.008 O.H 130,000 1,040.00
1.10.28.02.01.001.002 Kepala Tukang 0.008 O.H 120,000 960.00
1.10.28.02.01.001.006 Tukang Batu 0.075 O.H 110,000 8,250.00
1.10.28.02.01.002.001 Pekerja 0.150 O.H 90,000 13,500.00
Jumlah Harga Tenaga Kerja 23,750.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 3.108 Kg 1,306 4,059.53
Jumlah Harga Bahan 4,059.53
Peralatan
Jumlah Harga Peralatan
Jumlah 27,809.53
Overhead & Profit 15 % 4,171.43

Nilai HSPK : 31,981.00

42
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
2.01.01.04.02.018 1 m2 Pekerjaan Finishing Siar m2 Nilai HSPK 15,226.00
Pasangan Dinding Conblock Ekspose (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.004 O.H 130,000 520.00
1.10.28.02.01.001.002 Kepala Tukang 0.004 O.H 120,000 480.00
1.10.28.02.01.001.006 Tukang Batu 0.035 O.H 110,000 3,850.00
1.10.28.02.01.002.001 Pekerja 0.070 O.H 90,000 6,300.00
Jumlah Harga Tenaga Kerja 11,150.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 1.600 Kg 1,306 2,089.85
Jumlah Harga Bahan 2,089.85
Peralatan
Jumlah Harga Peralatan
Jumlah 13,239.85
Overhead & Profit 15 % 1,985.98

Nilai HSPK : 15,226.00


2.01.01.04.02.019 1 m2 Pekerjaan Finishing Siar m2 Nilai HSPK 67,066.00
Pasangan Batu Kali Adukan 1 Pc : 2 (dibulatkan) :
Ps
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.015 O.H 130,000 1,950.00
1.10.28.02.01.001.002 Kepala Tukang 0.015 O.H 120,000 1,800.00
1.10.28.02.01.001.006 Tukang Batu 0.150 O.H 110,000 16,500.00
1.10.28.02.01.002.001 Pekerja 0.300 O.H 90,000 27,000.00
Jumlah Harga Tenaga Kerja 47,250.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 6.340 Kg 1,306 8,281.03
1.1.7.01.01.01.004.00002 Pasir Pasang 0.012 m3 232,250 2,787.00
Jumlah Harga Bahan 11,068.03
Peralatan
Jumlah Harga Peralatan
Jumlah 58,318.03
Overhead & Profit 15 % 8,747.70

Nilai HSPK : 67,066.00


2.01.01.04.02.020 1 m2 Pekerjaan Acian m2 Nilai HSPK 41,107.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.010 O.H 130,000 1,300.00
1.10.28.02.01.001.002 Kepala Tukang 0.010 O.H 120,000 1,200.00
1.10.28.02.01.001.006 Tukang Batu 0.100 O.H 110,000 11,000.00
1.10.28.02.01.002.001 Pekerja 0.200 O.H 90,000 18,000.00
Jumlah Harga Tenaga Kerja 31,500.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 3.250 Kg 1,306 4,245.01
Jumlah Harga Bahan 4,245.01
Peralatan
Jumlah Harga Peralatan
Jumlah 35,745.01
Overhead & Profit 15 % 5,361.75

Nilai HSPK : 41,107.00


2.01.01.05 E. PEKERJAAN PENUTUP LANTAI &
DINDING
2.01.01.05.01 Penutup Lantai
2.01.01.05.01.001 1 m2 Pekerjaan Pasang Lantai Granit m2 Nilai HSPK 555,661.00
Ukuran 60X60 Cm (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.012 O.H 130,000 1,560.00
1.10.28.02.01.001.002 Kepala Tukang 0.012 O.H 120,000 1,440.00
1.10.28.02.01.001.006 Tukang Batu 0.120 O.H 110,000 13,200.00

43
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
1.10.28.02.01.002.001 Pekerja 0.240 O.H 90,000 21,600.00
Jumlah Harga Tenaga Kerja 37,800.00
Bahan
1.1.7.01.01.01.013.00040 Granit Aurora 60 x 60 1.050 m2 377,350 396,217.50
1.1.7.01.01.01.002.00001 Semen Portland 9.600 Kg 1,306 12,539.10
1.1.7.01.01.01.004.00002 Pasir Pasang 0.045 m3 232,250 10,451.25
1.1.7.01.01.01.002.00007 Semen Warna/Nat 1.500 Kg 17,450 26,175.00
Jumlah Harga Bahan 445,382.85
Peralatan
Jumlah Harga Peralatan
Jumlah 483,182.85
Overhead & Profit 15 % 72,477.43

Nilai HSPK : 555,661.00


2.01.01.05.01.002 1 m2 Pekerjaan Pasang Lantai Granit m2 Nilai HSPK 558,589.00
Ukuran 40X40 Cm (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.013 O.H 130,000 1,690.00
1.10.28.02.01.001.002 Kepala Tukang 0.013 O.H 120,000 1,560.00
1.10.28.02.01.001.006 Tukang Batu 0.125 O.H 110,000 13,750.00
1.10.28.02.01.002.001 Pekerja 0.250 O.H 90,000 22,500.00
Jumlah Harga Tenaga Kerja 39,500.00
Bahan
1.1.7.01.01.01.013.00036 Granito, 40 x 40 cm, type Salsa 1.061 m2 377,350 400,292.88
Polished
1.1.7.01.01.01.002.00001 Semen Portland 9.800 Kg 1,306 12,800.33
1.1.7.01.01.01.004.00002 Pasir Pasang 0.045 m3 232,250 10,451.25
1.1.7.01.01.01.002.00007 Semen Warna/Nat 1.300 Kg 17,450 22,685.00
Jumlah Harga Bahan 446,229.46
Peralatan
Jumlah Harga Peralatan
Jumlah 485,729.46
Overhead & Profit 15 % 72,859.42

Nilai HSPK : 558,589.00


2.01.01.05.01.003 1 m2 Pekerjaan Pasangan Lantai m2 Nilai HSPK 264,643.00
Keramik Polos Uk.40X40 Cm (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.035 O.H 130,000 4,550.00
1.10.28.02.01.001.002 Kepala Tukang 0.035 O.H 120,000 4,200.00
1.10.28.02.01.001.006 Tukang Batu 0.350 O.H 110,000 38,500.00
1.10.28.02.01.002.001 Pekerja 0.700 O.H 90,000 63,000.00
Jumlah Harga Tenaga Kerja 110,250.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 9.800 Kg 1,306 12,800.33
1.1.7.01.01.01.002.00007 Semen Warna/Nat 1.300 Kg 17,450 22,685.00
1.1.7.01.01.01.004.00002 Pasir Pasang 0.045 m3 232,250 10,451.25
1.1.7.01.01.01.013.00017 Keramik Lantai Polos, Asia, Uk. 40 x 1.061 m2 69,700 73,937.76
40
Jumlah Harga Bahan 119,874.34
Peralatan
Jumlah Harga Peralatan
Jumlah 230,124.34
Overhead & Profit 15 % 34,518.65

Nilai HSPK : 264,643.00


2.01.01.05.01.004 1 m2 Pekerjaan Pasangan Lantai m2 Nilai HSPK 248,024.00
Keramik Polos Uk.30X30 Cm (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.035 O.H 130,000 4,550.00
1.10.28.02.01.001.002 Kepala Tukang 0.035 O.H 120,000 4,200.00

44
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
1.10.28.02.01.001.006 Tukang Batu 0.350 O.H 110,000 38,500.00
1.10.28.02.01.002.001 Pekerja 0.700 O.H 90,000 63,000.00
Jumlah Harga Tenaga Kerja 110,250.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 10.00 Kg 1,306 13,061.57
1.1.7.01.01.01.002.00007 Semen Warna/Nat 0.500 Kg 17,450 8,725.00
1.1.7.01.01.01.004.00002 Pasir Pasang 0.045 m3 232,250 10,451.25
1.1.7.01.01.01.013.00017 Keramik Lantai Terang / Polos, Uk. 30 1.050 m2 69,700 73,185.00
x 30
Jumlah Harga Bahan 105,422.82
Peralatan
Jumlah Harga Peralatan
Jumlah 215,672.82
Overhead & Profit 15 % 32,350.92

Nilai HSPK : 248,024.00


2.01.01.05.01.005 1 m2 Pekerjaan Pasangan Lantai m2 Nilai HSPK 230,814.00
Keramik Polos Uk.20X20 Cm (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.035 O.H 130,000 4,550.00
1.10.28.02.01.001.002 Kepala Tukang 0.035 O.H 120,000 4,200.00
1.10.28.02.01.001.006 Tukang Batu 0.350 O.H 110,000 38,500.00
1.10.28.02.01.002.001 Pekerja 0.700 O.H 90,000 63,000.00
Jumlah Harga Tenaga Kerja 110,250.00
Bahan
1.1.7.01.01.01.013.00013 Keramik Lantai Polos, Uk. 20 x 20 1.050 m2 54,950 57,697.50
1.1.7.01.01.01.002.00001 Semen Portland 10.40 Kg 1,306 13,584.03
1.1.7.01.01.01.004.00002 Pasir Pasang 0.045 m3 232,250 10,451.25
1.1.7.01.01.01.002.00007 Semen Warna/Nat 0.500 Kg 17,450 8,725.00
Jumlah Harga Bahan 90,457.78
Peralatan
Jumlah Harga Peralatan
Jumlah 200,707.78
Overhead & Profit 15 % 30,106.17

Nilai HSPK : 230,814.00


2.01.01.05.01.006 1 m2 Pekerjaan Pasangan Lantai m2 Nilai HSPK 258,544.00
Keramik Motif Uk.40X40 Cm (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.035 O.H 130,000 4,550.00
1.10.28.02.01.001.002 Kepala Tukang 0.035 O.H 120,000 4,200.00
1.10.28.02.01.001.006 Tukang Batu 0.350 O.H 110,000 38,500.00
1.10.28.02.01.002.001 Pekerja 0.700 O.H 90,000 63,000.00
Jumlah Harga Tenaga Kerja 110,250.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 9.800 Kg 1,306 12,800.33
1.1.7.01.01.01.002.00007 Semen Warna/Nat 1.300 Kg 17,450 22,685.00
1.1.7.01.01.01.004.00002 Pasir Pasang 0.045 m3 232,250 10,451.25
1.1.7.01.01.01.013.00009 Keramik Lantai Motif, Uk. 40 x 40 1.061 m2 64,700 68,633.76

Jumlah Harga Bahan 114,570.34


Peralatan
Jumlah Harga Peralatan
Jumlah 224,820.34
Overhead & Profit 15 % 33,723.05

Nilai HSPK : 258,544.00


2.01.01.05.01.007 1 m2 Pekerjaan Pasangan Lantai m2 Nilai HSPK 258,870.00
Keramik Motif Uk. 30X30 Cm (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.035 O.H 130,000 4,550.00

45
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
1.10.28.02.01.001.002 Kepala Tukang 0.035 O.H 120,000 4,200.00
1.10.28.02.01.001.006 Tukang Batu 0.350 O.H 110,000 38,500.00
1.10.28.02.01.002.001 Pekerja 0.700 O.H 90,000 63,000.00
Jumlah Harga Tenaga Kerja 110,250.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 10.000 Kg 1,306 13,061.57
1.1.7.01.01.01.002.00007 Semen Warna/Nat 1.500 Kg 17,450 26,175.00
1.1.7.01.01.01.004.00002 Pasir Pasang 0.045 m3 232,250 10,451.25
1.1.7.01.01.01.013.00004 Keramik Lantai Motif, Uk. 30 x 30 1.068 m2 61,000 65,166.30

Jumlah Harga Bahan 114,854.12


Peralatan
Jumlah Harga Peralatan
Jumlah 225,104.12
Overhead & Profit 15 % 33,765.62

Nilai HSPK : 258,870.00


2.01.01.05.01.008 1 m2 Pekerjaan Pasangan Lantai m2 Nilai HSPK 261,297.00
Keramik Motif Uk. 20X20 Cm (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.035 O.H 130,000 4,550.00
1.10.28.02.01.001.002 Kepala Tukang 0.035 O.H 120,000 4,200.00
1.10.28.02.01.001.006 Tukang Batu 0.350 O.H 110,000 38,500.00
1.10.28.02.01.002.001 Pekerja 0.700 O.H 90,000 63,000.00
Jumlah Harga Tenaga Kerja 110,250.00
Bahan
1.1.7.01.01.01.013.00002 Keramik Lantai Motif, Uk. 20 x 20 1.060 m2 61,000 64,660.00

1.1.7.01.01.01.002.00001 Semen Portland 10.400 Kg 1,306 13,584.03


1.1.7.01.01.01.004.00002 Pasir Pasang 0.045 m3 232,250 10,451.25
1.1.7.01.01.01.002.00007 Semen Warna/Nat 1.620 Kg 17,450 28,269.00
Jumlah Harga Bahan 116,964.28
Peralatan
Jumlah Harga Peralatan
Jumlah 227,214.28
Overhead & Profit 15 % 34,082.14

Nilai HSPK : 261,297.00


2.01.01.05.01.009 1 m2 Pekerjaan Pasangan Lantai m2 Nilai HSPK 647,188.00
Marmer Ex. Tulungagung (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.035 O.H 130,000 4,550.00
1.10.28.02.01.001.002 Kepala Tukang 0.035 O.H 120,000 4,200.00
1.10.28.02.01.001.006 Tukang Batu 0.350 O.H 110,000 38,500.00
1.10.28.02.01.002.001 Pekerja 0.700 O.H 90,000 63,000.00
Jumlah Harga Tenaga Kerja 110,250.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 8.190 Kg 1,306 10,697.42
1.1.7.01.01.01.002.00007 Semen Warna/Nat 0.134 Kg 17,450 2,338.30
1.1.7.01.01.01.004.00002 Pasir Pasang 0.045 m3 232,250 10,451.25
1.1.7.01.01.01.013.00043 Marmer Ex. Tulungagung, Uk. 30 x 60 1.060 m2 404,750 429,035.00
cm
Jumlah Harga Bahan 452,521.97
Peralatan
Jumlah Harga Peralatan
Jumlah 562,771.97
Overhead & Profit 15 % 84,415.80

Nilai HSPK : 647,188.00


2.01.01.05.01.010 1 m2 Pekerjaan Pasangan Lantai m2 Nilai HSPK 840,887.00
Marmer Ex. Lampung/ Sulsel (dibulatkan) :

46
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.035 O.H 130,000 4,550.00
1.10.28.02.01.001.002 Kepala Tukang 0.035 O.H 120,000 4,200.00
1.10.28.02.01.001.006 Tukang Batu 0.350 O.H 110,000 38,500.00
1.10.28.02.01.002.001 Pekerja 0.700 O.H 90,000 63,000.00
Jumlah Harga Tenaga Kerja 110,250.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 8.190 Kg 1,306 10,697.42
1.1.7.01.01.01.002.00007 Semen Warna/Nat 0.134 Kg 17,450 2,338.30
1.1.7.01.01.01.004.00002 Pasir Pasang 0.045 m3 232,250 10,451.25
1.1.7.01.01.01.013.00044 Marmer Ex. Lampung, Uk. 30 x 60 cm 1.060 m2 563,650 597,469.00
(A)
Jumlah Harga Bahan 620,955.97
Peralatan
Jumlah Harga Peralatan
Jumlah 731,205.97
Overhead & Profit 15 % 109,680.90

Nilai HSPK : 840,887.00


2.01.01.05.01.011 1 m2 Pekerjaan Pasangan Lantai m2 Nilai HSPK 209,545.00
Parquet (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.035 O.H 130,000 4,550.00
1.10.28.02.01.001.002 Kepala Tukang 0.035 O.H 120,000 4,200.00
1.10.28.02.01.001.004 Tukang Kayu 0.350 O.H 110,000 38,500.00
1.10.28.02.01.002.001 Pekerja 0.700 O.H 90,000 63,000.00
Jumlah Harga Tenaga Kerja 110,250.00
Bahan
1.1.7.01.01.05.002.00047 Kayu Parquety Jati 1.050 m2 55,250 58,012.50
1.1.7.01.01.01.022.00271 Lem Kayu 0.600 Kg 23,250 13,950.00
Jumlah Harga Bahan 71,962.50
Peralatan
Jumlah Harga Peralatan
Jumlah 182,212.50
Overhead & Profit 15 % 27,331.88

Nilai HSPK : 209,545.00


2.01.01.05.01.012 1 m2 Pekerjaan Pasangan Lantai m2 Nilai HSPK 94,413.00
Karpet (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.009 O.H 130,000 1,170.00
1.10.28.02.01.001.002 Kepala Tukang 0.017 O.H 120,000 2,040.00
1.10.28.02.01.001.004 Tukang Kayu 0.170 O.H 110,000 18,700.00
1.10.28.02.01.002.001 Pekerja 0.170 O.H 90,000 15,300.00
Jumlah Harga Tenaga Kerja 37,210.00
Bahan
9.1.2.10.07.01.001.00037 Karpet 1.050 m2 35,000 36,750.00
1.1.7.01.01.01.022.00271 Lem 0.350 Kg 23,250 8,137.50
Jumlah Harga Bahan 44,887.50
Peralatan
Jumlah Harga Peralatan
Jumlah 82,097.50
Overhead & Profit 15 % 12,314.63

Nilai HSPK : 94,413.00


2.01.01.05.01.013 1 m2 Pemasangan Underlayer m2 Nilai HSPK 121,803.00
(Pelapis Bawah Karpet) (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.006 O.H 130,000 780.00
1.10.28.02.01.001.002 Kepala Tukang 0.012 O.H 120,000 1,440.00
1.10.28.02.01.001.004 Tukang Kayu 0.120 O.H 110,000 13,200.00
1.10.28.02.01.002.001 Pekerja 0.120 O.H 90,000 10,800.00
Jumlah Harga Tenaga Kerja 26,220.00

47
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Bahan
1.1.7.01.01.01.022.00242 Karpet Foam Lapisan Karpet 1.050 m2 68,150 71,557.50
1.1.7.01.01.01.022.00271 Lem Kayu 0.350 Kg 23,250 8,137.50
Jumlah Harga Bahan 79,695.00
Peralatan
Jumlah Harga Peralatan
Jumlah 105,915.00
Overhead & Profit 15 % 15,887.25

Nilai HSPK : 121,803.00


2.01.01.05.02 Penutup Dinding
2.01.01.05.02.001 1 m2 Pekerjaan Pasangan Dinding m2 Nilai HSPK 297,880.00
Keramik Polos Uk.20X25 Cm (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.045 O.H 130,000 5,850.00
1.10.28.02.01.001.002 Kepala Tukang 0.045 O.H 120,000 5,400.00
1.10.28.02.01.001.006 Tukang Batu 0.450 O.H 110,000 49,500.00
1.10.28.02.01.002.001 Pekerja 0.900 O.H 90,000 81,000.00
Jumlah Harga Tenaga Kerja 141,750.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 9.300 Kg 1,306 12,147.26
1.1.7.01.01.01.002.00007 Semen Warna/Nat 1.940 Kg 17,450 33,853.00
1.1.7.01.01.01.004.00002 Pasir Pasang 0.018 m3 232,250 4,180.50
1.1.7.01.01.01.013.00018 Keramik Dinding Motif, Uk. 20 x 25 1.050 m2 63,900 67,095.00

Jumlah Harga Bahan 117,275.76


Peralatan
Jumlah Harga Peralatan
Jumlah 259,025.76
Overhead & Profit 15 % 38,853.86

Nilai HSPK : 297,880.00


2.01.01.05.02.002 1 m2 Pekerjaan Pasangan Dinding m2 Nilai HSPK 323,716.00
Keramik Polos Uk.20X20 Cm (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.045 O.H 130,000 5,850.00
1.10.28.02.01.001.002 Kepala Tukang 0.045 O.H 120,000 5,400.00
1.10.28.02.01.001.006 Tukang Batu 0.450 O.H 110,000 49,500.00
1.10.28.02.01.002.001 Pekerja 0.900 O.H 90,000 81,000.00
Jumlah Harga Tenaga Kerja 141,750.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 26.500 Kg 1,306 34,613.15
1.1.7.01.01.01.002.00007 Semen Warna/Nat 1.940 Kg 17,450 33,853.00
1.1.7.01.01.01.004.00002 Pasir Pasang 0.018 m3 232,250 4,180.50
1.1.7.01.01.01.013.00018 Keramik Dinding Motif, Uk. 20 x 25 1.050 m2 63,900 67,095.00

Jumlah Harga Bahan 139,741.65


Peralatan
Jumlah Harga Peralatan
Jumlah 281,491.65
Overhead & Profit 15 % 42,223.75

Nilai HSPK : 323,716.00


2.01.01.05.02.003 1 m2 Pekerjaan Pasangan Dinding m2 Nilai HSPK 314,135.00
Keramik Polos Uk.10X20 Cm (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.045 O.H 130,000 5,850.00
1.10.28.02.01.001.002 Kepala Tukang 0.045 O.H 120,000 5,400.00
1.10.28.02.01.001.006 Tukang Batu 0.450 O.H 110,000 49,500.00
1.10.28.02.01.002.001 Pekerja 0.900 O.H 90,000 81,000.00
Jumlah Harga Tenaga Kerja 141,750.00

48
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 9.300 Kg 1,306 12,147.26
1.1.7.01.01.01.002.00007 Semen Warna/Nat 2.750 Kg 17,450 47,987.50
1.1.7.01.01.01.004.00002 Pasir Pasang 0.018 m3 232,250 4,180.50
1.1.7.01.01.01.013.00018 Keramik Dinding Motif, Uk. 20 x 25 1.050 m2 63,900 67,095.00

Jumlah Harga Bahan 131,410.26


Peralatan
Jumlah Harga Peralatan
Jumlah 273,160.26
Overhead & Profit 15 % 40,974.04

Nilai HSPK : 314,135.00


2.01.01.05.02.004 1 m2 Pekerjaan Pasangan Dinding m2 Nilai HSPK 353,908.00
Keramik Motif Uk.20X25 Cm (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.045 O.H 130,000 5,850.00
1.10.28.02.01.001.002 Kepala Tukang 0.045 O.H 120,000 5,400.00
1.10.28.02.01.001.006 Tukang Batu 0.450 O.H 110,000 49,500.00
1.10.28.02.01.002.001 Pekerja 0.900 O.H 90,000 81,000.00
Jumlah Harga Tenaga Kerja 141,750.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 9.300 Kg 1,306 12,147.26
1.1.7.01.01.01.002.00007 Semen Warna/Nat 1.940 Kg 17,450 33,853.00
1.1.7.01.01.01.004.00002 Pasir Pasang 0.018 m3 232,250 4,180.50
1.1.7.01.01.01.013.00019 Keramik Dinding Motif, Uk. 20 x 25 1.050 m2 110,300 115,815.00

Jumlah Harga Bahan 165,995.76


Peralatan
Jumlah Harga Peralatan
Jumlah 307,745.76
Overhead & Profit 15 % 46,161.86

Nilai HSPK : 353,908.00


2.01.01.05.02.005 1 m2 Pekerjaan Pasangan Dinding m2 Nilai HSPK 297,880.00
Keramik Motif Uk.20X20 Cm (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.045 O.H 130,000 5,850.00
1.10.28.02.01.001.002 Kepala Tukang 0.045 O.H 120,000 5,400.00
1.10.28.02.01.001.006 Tukang Batu 0.450 O.H 110,000 49,500.00
1.10.28.02.01.002.001 Pekerja 0.900 O.H 90,000 81,000.00
Jumlah Harga Tenaga Kerja 141,750.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 9.300 Kg 1,306 12,147.26
1.1.7.01.01.01.002.00007 Semen Warna/Nat 1.940 Kg 17,450 33,853.00
1.1.7.01.01.01.004.00002 Pasir Pasang 0.018 m3 232,250 4,180.50
1.1.7.01.01.01.013.00018 Keramik Dinding Motif, Uk. 20 x 25 1.050 m2 63,900 67,095.00

Jumlah Harga Bahan 117,275.76


Peralatan
Jumlah Harga Peralatan
Jumlah 259,025.76
Overhead & Profit 15 % 38,853.86

Nilai HSPK : 297,880.00


2.01.01.05.02.006 1 m2 Pekerjaan Pasangan Dinding m2 Nilai HSPK 314,135.00
Keramik Motif Uk.10X20 Cm (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.045 O.H 130,000 5,850.00
1.10.28.02.01.001.002 Kepala Tukang 0.045 O.H 120,000 5,400.00
1.10.28.02.01.001.006 Tukang Batu 0.450 O.H 110,000 49,500.00

49
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
1.10.28.02.01.002.001 Pekerja 0.900 O.H 90,000 81,000.00
Jumlah Harga Tenaga Kerja 141,750.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 9.300 Kg 1,306 12,147.26
1.1.7.01.01.01.002.00007 Semen Warna/Nat 2.750 Kg 17,450 47,987.50
1.1.7.01.01.01.004.00002 Pasir Pasang 0.018 m3 232,250 4,180.50
1.1.7.01.01.01.013.00018 Keramik Dinding Motif, Uk. 20 x 25 1.050 m2 63,900 67,095.00

Jumlah Harga Bahan 131,410.26


Peralatan
Jumlah Harga Peralatan
Jumlah 273,160.26
Overhead & Profit 15 % 40,974.04

Nilai HSPK : 314,135.00


2.01.01.05.02.007 1 m' Pekerjaan Pasangan Plint m' Nilai HSPK 92,377.00
Keramik 10X20 Cm (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.005 O.H 130,000 650.00
1.10.28.02.01.001.002 Kepala Tukang 0.035 O.H 120,000 4,200.00
1.10.28.02.01.001.006 Tukang Batu 0.090 O.H 110,000 9,900.00
1.10.28.02.01.002.001 Pekerja 0.090 O.H 90,000 8,100.00
Jumlah Harga Tenaga Kerja 22,850.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 1.140 Kg 1,306 1,489.02
1.1.7.01.01.01.002.00007 Semen Warna/Nat 0.025 Kg 17,450 436.25
1.1.7.01.01.01.004.00002 Pasir Pasang 0.003 m3 232,250 696.75
1.1.7.01.01.01.013.00026 Plint Keramik Uk. 10 x 20 cm 5.300 buah 10,350 54,855.00
Jumlah Harga Bahan 57,477.02
Peralatan
Jumlah Harga Peralatan
Jumlah 80,327.02
Overhead & Profit 15 % 12,049.05

Nilai HSPK : 92,377.00


2.01.01.05.02.008 1 m' Pekerjaan Pasangan Plint m' Nilai HSPK 47,471.00
Keramik 10X10 Cm (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.005 O.H 130,000 650.00
1.10.28.02.01.001.002 Kepala Tukang 0.035 O.H 120,000 4,200.00
1.10.28.02.01.001.006 Tukang Batu 0.090 O.H 110,000 9,900.00
1.10.28.02.01.002.001 Pekerja 0.090 O.H 90,000 8,100.00
Jumlah Harga Tenaga Kerja 22,850.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 1.140 Kg 1,306 1,489.02
1.1.7.01.01.01.002.00007 Semen Warna/Nat 0.050 Kg 17,450 872.50
1.1.7.01.01.01.004.00002 Pasir Pasang 0.003 m3 232,250 696.75
1.1.7.01.01.01.013.00028 Plint Keramik Uk. 10 x 10 cm 10.600 buah 1,450 15,370.00
Jumlah Harga Bahan 18,428.27
Peralatan
Jumlah Harga Peralatan
Jumlah 41,278.27
Overhead & Profit 15 % 6,191.74

Nilai HSPK : 47,471.00


2.01.01.05.02.009 1 m' Pekerjaan Pasangan Plint m' Nilai HSPK 77,470.00
Keramik 5X20 Cm (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.005 O.H 130,000 650.00
1.10.28.02.01.001.002 Kepala Tukang 0.035 O.H 120,000 4,200.00
1.10.28.02.01.001.006 Tukang Batu 0.090 O.H 110,000 9,900.00
1.10.28.02.01.002.001 Pekerja 0.090 O.H 90,000 8,100.00
Jumlah Harga Tenaga Kerja 22,850.00
Bahan

50
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
1.1.7.01.01.01.013.00025 Plint Keramik Uk. 5 x 20 cm 5.300 buah 8,150 43,195.00
1.1.7.01.01.01.002.00001 Semen Portland 0.570 Kg 1,306 744.51
1.1.7.01.01.01.004.00002 Pasir Pasang 0.0015 m3 232,250 348.38
1.1.7.01.01.01.002.00007 Semen Warna/Nat 0.013 Kg 17,450 226.85
Jumlah Harga Bahan 44,514.73
Peralatan
Jumlah Harga Peralatan
Jumlah 67,364.73
Overhead & Profit 15 % 10,104.71

Nilai HSPK : 77,470.00


2.01.01.05.02.010 1 m' Pekerjaan Pasangan Plint m' Nilai HSPK 214,667.00
Marmer Tinggi 10 Cm (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.042 O.H 130,000 5,460.00
1.10.28.02.01.001.002 Kepala Tukang 0.042 O.H 120,000 5,040.00
1.10.28.02.01.001.006 Tukang Batu 0.420 O.H 110,000 46,200.00
1.10.28.02.01.002.001 Pekerja 0.840 O.H 90,000 75,600.00
Jumlah Harga Tenaga Kerja 132,300.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 16.852 Kg 1,306 22,011.35
1.1.7.01.01.01.004.00002 Pasir Pasang 0.032 m3 232,250 7,432.00
1.1.7.01.01.01.002.00007 Semen Warna/Nat 1.300 Kg 17,450 22,685.00
1.1.7.01.01.01.013.00045 Plint Marmer 0.110 m2 20,350 2,238.50
Jumlah Harga Bahan 54,366.85
Peralatan
Jumlah Harga Peralatan
Jumlah 186,666.85
Overhead & Profit 15 % 28,000.03

Nilai HSPK : 214,667.00


2.01.01.05.02.011 1 m2 Pekerjaan Pemasangan Batu m2 Nilai HSPK 323,425.00
Palimanan (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.035 O.H 130,000 4,550.00
1.10.28.02.01.001.002 Kepala Tukang 0.035 O.H 120,000 4,200.00
1.10.28.02.01.001.006 Tukang Batu 0.350 O.H 110,000 38,500.00
1.10.28.02.01.002.001 Pekerja 0.700 O.H 90,000 63,000.00
Jumlah Harga Tenaga Kerja 110,250.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 11.752 Kg 1,306 15,349.95
1.1.7.01.01.01.004.00002 Pasir Pasang 0.035 m3 232,250 8,128.75
1.1.7.01.01.01.005.00025 Batu Palimanan Uk. 20 x 20 cm 1.100 m2 134,100 147,510.00
Jumlah Harga Bahan 170,988.70
Peralatan
Jumlah Harga Peralatan
Jumlah 281,238.70
Overhead & Profit 15 % 42,185.81

Nilai HSPK : 323,425.00


2.01.01.05.02.012 1 m2 Pekerjaan Pemasangan Batu m2 Nilai HSPK 312,926.00
Candi (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.035 O.H 130,000 4,550.00
1.10.28.02.01.001.002 Kepala Tukang 0.035 O.H 120,000 4,200.00
1.10.28.02.01.001.006 Tukang Batu 0.350 O.H 110,000 38,500.00
1.10.28.02.01.002.001 Pekerja 0.700 O.H 90,000 63,000.00
Jumlah Harga Tenaga Kerja 110,250.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 11.752 Kg 1,306 15,349.95
1.1.7.01.01.01.004.00002 Pasir Pasang 0.035 m3 232,250 8,128.75
1.1.7.01.01.01.005.00041 Batu Candi Polos, Uk. 20 x 20 1.100 m2 125,800 138,380.00
Jumlah Harga Bahan 161,858.70
Peralatan

51
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Jumlah Harga Peralatan
Jumlah 272,108.70
Overhead & Profit 15 % 40,816.31

Nilai HSPK : 312,926.00


2.01.01.05.02.013 1 m2 Pekerjaan Pemasangan Batu m2 Nilai HSPK 271,307.00
Ampyang (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.035 O.H 130,000 4,550.00
1.10.28.02.01.001.002 Kepala Tukang 0.035 O.H 120,000 4,200.00
1.10.28.02.01.001.006 Tukang Batu 0.350 O.H 110,000 38,500.00
1.10.28.02.01.002.001 Pekerja 0.700 O.H 90,000 63,000.00
Jumlah Harga Tenaga Kerja 110,250.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 11.752 Kg 1,306 15,349.95
1.1.7.01.01.01.004.00002 Pasir Pasang 0.035 m3 232,250 8,128.75
1.1.7.01.01.01.005.00043 Batu Ampyang Multi Warna 1.100 m2 92,900 102,190.00
Jumlah Harga Bahan 125,668.70
Peralatan
Jumlah Harga Peralatan
Jumlah 235,918.70
Overhead & Profit 15 % 35,387.81

Nilai HSPK : 271,307.00


2.01.01.05.02.014 1 m2 Pekerjaan Pemasangan Batu m2 Nilai HSPK 428,483.00
Gilang Ex Jember (Beraturan) (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.035 O.H 130,000 4,550.00
1.10.28.02.01.001.002 Kepala Tukang 0.035 O.H 120,000 4,200.00
1.10.28.02.01.001.006 Tukang Batu 0.350 O.H 110,000 38,500.00
1.10.28.02.01.002.001 Pekerja 0.700 O.H 90,000 63,000.00
Jumlah Harga Tenaga Kerja 110,250.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 11.752 Kg 1,306 15,349.95
1.1.7.01.01.01.004.00002 Pasir Pasang 0.035 m3 232,250 8,128.75
1.1.7.01.01.01.005.00016 Batu Gilang Ex. Jember (Profil 1.100 m2 217,150 238,865.00
Beraturan)
Jumlah Harga Bahan 262,343.70
Peralatan
Jumlah Harga Peralatan
Jumlah 372,593.70
Overhead & Profit 15 % 55,889.06

Nilai HSPK : 428,483.00


2.01.01.05.02.015 1 m2 Pekerjaan Pemasangan Batu m2 Nilai HSPK 315,392.00
Gilang Ex Jember (Tak Beraturan) (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.035 O.H 130,000 4,550.00
1.10.28.02.01.001.002 Kepala Tukang 0.035 O.H 120,000 4,200.00
1.10.28.02.01.001.006 Tukang Batu 0.350 O.H 110,000 38,500.00
1.10.28.02.01.002.001 Pekerja 0.700 O.H 90,000 63,000.00
Jumlah Harga Tenaga Kerja 110,250.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 11.752 Kg 1,306 15,349.95
1.1.7.01.01.01.004.00002 Pasir Pasang 0.035 m3 232,250 8,128.75
1.1.7.01.01.01.005.00017 Batu Gilang Ex. Jember (Profil Tak 1.100 m2 127,750 140,525.00
Beraturan)
Jumlah Harga Bahan 164,003.70
Peralatan
Jumlah Harga Peralatan
Jumlah 274,253.70
Overhead & Profit 15 % 41,138.06

52
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f

Nilai HSPK : 315,392.00


2.01.01.05.02.016 1 m2 Pekerjaan Pemasangan Batu m2 Nilai HSPK 347,713.00
Gilang Ex Cirebon (Simetris) (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.035 O.H 130,000 4,550.00
1.10.28.02.01.001.002 Kepala Tukang 0.035 O.H 120,000 4,200.00
1.10.28.02.01.001.006 Tukang Batu 0.350 O.H 110,000 38,500.00
1.10.28.02.01.002.001 Pekerja 0.700 O.H 90,000 63,000.00
Jumlah Harga Tenaga Kerja 110,250.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 11.752 Kg 1,306 15,349.95
1.1.7.01.01.01.004.00002 Pasir Pasang 0.035 m3 232,250 8,128.75
1.1.7.01.01.01.005.00022 Batu Gilang Ex. Cirebon Beraturan 1.100 m2 153,300 168,630.00

Jumlah Harga Bahan 192,108.70


Peralatan
Jumlah Harga Peralatan
Jumlah 302,358.70
Overhead & Profit 15 % 45,353.81

Nilai HSPK : 347,713.00


2.01.01.05.02.017 1 m2 Pekerjaan Pemasangan Batu m2 Nilai HSPK 307,296.00
Gilang Ex Cirebon Asimetris (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.035 O.H 130,000 4,550.00
1.10.28.02.01.001.002 Kepala Tukang 0.035 O.H 120,000 4,200.00
1.10.28.02.01.001.006 Tukang Batu 0.350 O.H 110,000 38,500.00
1.10.28.02.01.002.001 Pekerja 0.700 O.H 90,000 63,000.00
Jumlah Harga Tenaga Kerja 110,250.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 11.752 Kg 1,306 15,349.95
1.1.7.01.01.01.004.00002 Pasir Pasang 0.035 m3 232,250 8,128.75
1.1.7.01.01.01.005.00023 Batu Gilang Ex. Cirebon Acak 1.100 m2 121,350 133,485.00
Jumlah Harga Bahan 156,963.70
Peralatan
Jumlah Harga Peralatan
Jumlah 267,213.70
Overhead & Profit 15 % 40,082.06

Nilai HSPK : 307,296.00


2.01.01.05.02.018 1 m2 Pekerjaan Pemasangan Wall m2 Nilai HSPK 544,597.00
Paper (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.002 O.H 130,000 260.00
1.10.28.02.01.001.002 Kepala Tukang 0.017 O.H 120,000 2,040.00
1.10.28.02.01.001.006 Tukang batu 0.175 O.H 110,000 19,250.00
1.10.28.02.01.002.001 Pekerja 0.350 O.H 90,000 31,500.00
Jumlah Harga Tenaga Kerja 53,050.00
Bahan
1.1.7.01.01.01.022.00243 Wall Paper Lebar, 50 cm 2.200 m' 188,500 414,700.00
1.1.7.01.01.01.022.00271 Lem Kayu, Fox Uk. 1 Kg 0.250 Kg 23,250 5,812.50
Jumlah Harga Bahan 420,512.50
Peralatan
Jumlah Harga Peralatan
Jumlah 473,562.50
Overhead & Profit 15 % 71,034.38

Nilai HSPK : 544,597.00


2.01.01.06 F. PEKERJAAN KAYU
2.01.01.06.01 Kusen, Pintu, Jendela, Dan Jalusi

53
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
2.01.01.06.01.001 1 m3 Pekerjaan Kusen Pintu/ m3 Nilai HSPK 28,810,608.00
Jendela Kayu Jati (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.350 O.H 130,000 45,500.00
1.10.28.02.01.001.002 Kepala Tukang 2.100 O.H 120,000 252,000.00
1.10.28.02.01.001.004 Tukang Kayu 21.000 O.H 110,000 2,310,000.00
1.10.28.02.01.002.001 Pekerja 7.000 O.H 90,000 630,000.00
Jumlah Harga Tenaga Kerja 3,237,500.00
Bahan
1.1.7.01.01.05.002.00001 Kayu Jati, Balok, Uk. 6/12, 8/12, x 1.100 m3 19,788,650 21,767,515.00
400 cm
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 1.250 Kg 19,550 24,437.50
1.1.7.01.01.01.022.00271 Lem Kayu 1.000 Kg 23,250 23,250.00
Jumlah Harga Bahan 21,815,202.50
Peralatan
Jumlah Harga Peralatan
Jumlah 25,052,702.50
Overhead & Profit 15 % 3,757,905.38

Nilai HSPK : 28,810,608.00


2.01.01.06.01.002 1 m3 Pekerjaan Kusen Pintu/ m3 Nilai HSPK 16,063,876.00
Jendela Kayu Kamper (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.300 O.H 130,000 39,000.00
1.10.28.02.01.001.002 Kepala Tukang 1.800 O.H 120,000 216,000.00
1.10.28.02.01.001.004 Tukang Kayu 18.000 O.H 110,000 1,980,000.00
1.10.28.02.01.002.001 Pekerja 6.000 O.H 90,000 540,000.00
Jumlah Harga Tenaga Kerja 2,775,000.00
Bahan
1.1.7.01.01.05.002.00009 Kayu Kamper, Balok, Uk. 6 x 12 x 400 1.200 m3 9,288,250 11,145,900.00
cm
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 1.250 Kg 19,550 24,437.50
1.1.7.01.01.01.022.00271 Lem Kayu 1.000 Kg 23,250 23,250.00
Jumlah Harga Bahan 11,193,587.50
Peralatan
Jumlah Harga Peralatan
Jumlah 13,968,587.50
Overhead & Profit 15 % 2,095,288.13

Nilai HSPK : 16,063,876.00


2.01.01.06.01.003 1 m3 Pekerjaan Kusen Pintu/ m3 Nilai HSPK 13,660,537.00
Jendela Kayu Kruing (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.300 O.H 130,000 39,000.00
1.10.28.02.01.001.002 Kepala Tukang 1.800 O.H 120,000 216,000.00
1.10.28.02.01.001.004 Tukang Kayu 18.000 O.H 110,000 1,980,000.00
1.10.28.02.01.002.001 Pekerja 6.000 O.H 90,000 540,000.00
Jumlah Harga Tenaga Kerja 2,775,000.00
Bahan
1.1.7.01.01.05.002.00019 Kayu Kruing, Balok. Uk. 6 x 12 x 400 1.200 m3 7,546,700 9,056,040.00
cm
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 1.250 Kg 19,550 24,437.50
1.1.7.01.01.01.022.00271 Lem Kayu 1.000 Kg 23,250 23,250.00
Jumlah Harga Bahan 9,103,727.50
Peralatan
Jumlah Harga Peralatan
Jumlah 11,878,727.50
Overhead & Profit 15 % 1,781,809.13

Nilai HSPK : 13,660,537.00


2.01.01.06.01.004 1 m2 Pekerjaan Pasang Pintu Klamp m2 Nilai HSPK 1,097,634.00
Kayu Jati (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.018 O.H 130,000 2,340.00

54
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
1.10.28.02.01.001.002 Kepala Tukang 0.105 O.H 120,000 12,600.00
1.10.28.02.01.001.004 Tukang Kayu 1.050 O.H 110,000 115,500.00
1.10.28.02.01.002.001 Pekerja 0.350 O.H 90,000 31,500.00
Jumlah Harga Tenaga Kerja 161,940.00
Bahan
1.1.7.01.01.05.002.00002 Kayu Jati, Papan, Uk. 2 x 20 x 400 cm 0.040 m3 19,788,650 791,546.00

1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.050 Kg 19,550 977.50


Jumlah Harga Bahan 792,523.50
Peralatan
Jumlah Harga Peralatan
Jumlah 954,463.50
Overhead & Profit 15 % 143,169.53

Nilai HSPK : 1,097,634.00


2.01.01.06.01.005 1 m2 Pekerjaan Pasang Pintu Klamp m2 Nilai HSPK 668,023.00
Kayu Kamper (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.018 O.H 130,000 2,340.00
1.10.28.02.01.001.002 Kepala Tukang 0.105 O.H 120,000 12,600.00
1.10.28.02.01.001.004 Tukang Kayu 1.050 O.H 110,000 115,500.00
1.10.28.02.01.002.001 Pekerja 0.350 O.H 90,000 31,500.00
Jumlah Harga Tenaga Kerja 161,940.00
Bahan
1.1.7.01.01.05.002.00011 Kayu Kamper, Papan, Uk. 2 x 20 x 0.040 m3 10,449,300 417,972.00
400 cm
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.050 Kg 19,550 977.50
Jumlah Harga Bahan 418,949.50
Peralatan
Jumlah Harga Peralatan
Jumlah 580,889.50
Overhead & Profit 15 % 87,133.43

Nilai HSPK : 668,023.00


2.01.01.06.01.006 1 m2 Pekerjaan Pasang Pintu Klamp m2 Nilai HSPK 587,912.00
Kayu Kruing (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.018 O.H 130,000 2,340.00
1.10.28.02.01.001.002 Kepala Tukang 0.105 O.H 120,000 12,600.00
1.10.28.02.01.001.004 Tukang Kayu 1.050 O.H 110,000 115,500.00
1.10.28.02.01.002.001 Pekerja 0.350 O.H 90,000 31,500.00
Jumlah Harga Tenaga Kerja 161,940.00
Bahan
1.1.7.01.01.05.002.00021 Kayu Kruing, Papan, Uk. 2 x 20 x 400 0.040 m3 8,707,750 348,310.00
cm
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.050 Kg 19,550 977.50
Jumlah Harga Bahan 349,287.50
Peralatan
Jumlah Harga Peralatan
Jumlah 511,227.50
Overhead & Profit 15 % 76,684.13

Nilai HSPK : 587,912.00


2.01.01.06.01.007 1 m2 Pekerjaan Pasang Daun Pintu m2 Nilai HSPK 1,455,522.00
Panil Kayu Jati (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.050 O.H 130,000 6,500.00
1.10.28.02.01.001.002 Kepala Tukang 0.300 O.H 120,000 36,000.00
1.10.28.02.01.001.004 Tukang Kayu 3.000 O.H 110,000 330,000.00
1.10.28.02.01.002.001 Pekerja 1.000 O.H 90,000 90,000.00
Jumlah Harga Tenaga Kerja 462,500.00
Bahan
1.1.7.01.01.05.002.00002 Kayu Jati, Papan, Uk. 2 x 20 x 400 cm 0.040 m3 19,788,650 791,546.00

55
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
1.1.7.01.01.01.022.00271 Lem Kayu 0.500 Kg 23,250 11,625.00
Jumlah Harga Bahan 803,171.00
Peralatan
Jumlah Harga Peralatan
Jumlah 1,265,671.00
Overhead & Profit 15 % 189,850.65

Nilai HSPK : 1,455,522.00


2.01.01.06.01.008 1 m2 Pekerjaan Pasang Pintu Panil m2 Nilai HSPK 1,025,912.00
Kayu Kamper (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.050 O.H 130,000 6,500.00
1.10.28.02.01.001.002 Kepala Tukang 0.300 O.H 120,000 36,000.00
1.10.28.02.01.001.004 Tukang Kayu 3.000 O.H 110,000 330,000.00
1.10.28.02.01.002.001 Pekerja 1.000 O.H 90,000 90,000.00
Jumlah Harga Tenaga Kerja 462,500.00
Bahan
1.1.7.01.01.05.002.00011 Kayu Kamper, Papan, Uk. 2 x 20 x 0.040 m3 10,449,300 417,972.00
400 cm
1.1.7.01.01.01.022.00271 Lem Kayu 0.500 Kg 23,250 11,625.00
Jumlah Harga Bahan 429,597.00
Peralatan
Jumlah Harga Peralatan
Jumlah 892,097.00
Overhead & Profit 15 % 133,814.55

Nilai HSPK : 1,025,912.00


2.01.01.06.01.009 1 m2 Pekerjaan Pasang Pintu Panil m2 Nilai HSPK 945,801.00
Kayu Kruing (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.050 O.H 130,000 6,500.00
1.10.28.02.01.001.002 Kepala Tukang 0.300 O.H 120,000 36,000.00
1.10.28.02.01.001.004 Tukang Kayu 3.000 O.H 110,000 330,000.00
1.10.28.02.01.002.001 Pekerja 1.000 O.H 90,000 90,000.00
Jumlah Harga Tenaga Kerja 462,500.00
Bahan
1.1.7.01.01.05.002.00021 Kayu Kruing, Papan, Uk. 2 x 20 x 400 0.040 m3 8,707,750 348,310.00
cm
1.1.7.01.01.01.022.00271 Lem Kayu 0.500 Kg 23,250 11,625.00
Jumlah Harga Bahan 359,935.00
Peralatan
Jumlah Harga Peralatan
Jumlah 822,435.00
Overhead & Profit 15 % 123,365.25

Nilai HSPK : 945,801.00


2.01.01.06.01.010 1 m2 Pekerjaan Pasang Pintu/ m2 Nilai HSPK 979,688.00
Jendela Kaca Kayu Jati (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.040 O.H 130,000 5,200.00
1.10.28.02.01.001.002 Kepala Tukang 0.240 O.H 120,000 28,800.00
1.10.28.02.01.001.004 Tukang Kayu 2.400 O.H 110,000 264,000.00
1.10.28.02.01.002.001 Pekerja 0.800 O.H 90,000 72,000.00
Jumlah Harga Tenaga Kerja 370,000.00
Bahan
1.1.7.01.01.05.002.00002 Kayu Jati, Papan, Uk. 2 x 20 x 400 cm 0.024 m3 19,788,650 474,927.60

1.1.7.01.01.01.022.00271 Lem Kayu 0.300 Kg 23,250 6,975.00


Jumlah Harga Bahan 481,902.60
Peralatan
Jumlah Harga Peralatan
Jumlah 851,902.60
Overhead & Profit 15 % 127,785.39

56
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f

Nilai HSPK : 979,688.00


2.01.01.06.01.011 1 m2 Pekerjaan Pasang Pintu/ m2 Nilai HSPK 721,922.00
Jendela Kaca Kayu Kamper (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.040 O.H 130,000 5,200.00
1.10.28.02.01.001.002 Kepala Tukang 0.240 O.H 120,000 28,800.00
1.10.28.02.01.001.004 Tukang Kayu 2.400 O.H 110,000 264,000.00
1.10.28.02.01.002.001 Pekerja 0.800 O.H 90,000 72,000.00
Jumlah Harga Tenaga Kerja 370,000.00
Bahan
1.1.7.01.01.05.002.00011 Kayu Kamper, Papan, Uk. 2 x 20 x 0.024 m3 10,449,300 250,783.20
400 cm
1.1.7.01.01.01.022.00271 Lem Kayu 0.300 Kg 23,250 6,975.00
Jumlah Harga Bahan 257,758.20
Peralatan
Jumlah Harga Peralatan
Jumlah 627,758.20
Overhead & Profit 15 % 94,163.73

Nilai HSPK : 721,922.00


2.01.01.06.01.012 1 m2 Pekerjaan Pasang Pintu/ m2 Nilai HSPK 673,856.00
Jendela Kaca Kayu Kruing (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.040 O.H 130,000 5,200.00
1.10.28.02.01.001.002 Kepala Tukang 0.240 O.H 120,000 28,800.00
1.10.28.02.01.001.004 Tukang Kayu 2.400 O.H 110,000 264,000.00
1.10.28.02.01.002.001 Pekerja 0.800 O.H 90,000 72,000.00
Jumlah Harga Tenaga Kerja 370,000.00
Bahan
1.1.7.01.01.05.002.00021 Kayu Kruing, Papan, Uk. 2 x 20 x 400 0.024 m3 8,707,750 208,986.00
cm
1.1.7.01.01.01.022.00271 Lem Kayu 0.300 Kg 23,250 6,975.00
Jumlah Harga Bahan 215,961.00
Peralatan
Jumlah Harga Peralatan
Jumlah 585,961.00
Overhead & Profit 15 % 87,894.15

Nilai HSPK : 673,856.00


2.01.01.06.01.013 1 m2 Pekerjaan Pasang m2 Nilai HSPK 2,001,689.00
Pintu/Jendela Jalusi Kayu Jati (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.050 O.H 130,000 6,500.00
1.10.28.02.01.001.002 Kepala Tukang 0.300 O.H 120,000 36,000.00
1.10.28.02.01.001.004 Tukang Kayu 3.000 O.H 110,000 330,000.00
1.10.28.02.01.002.001 Pekerja 1.000 O.H 90,000 90,000.00
Jumlah Harga Tenaga Kerja 462,500.00
Bahan
1.1.7.01.01.05.002.00002 Kayu Jati, Papan, Uk. 2 x 20 x 400 cm 0.064 m3 19,788,650 1,266,473.60

1.1.7.01.01.01.022.00271 Lem Kayu 0.500 Kg 23,250 11,625.00


Jumlah Harga Bahan 1,278,098.60
Peralatan
Jumlah Harga Peralatan
Jumlah 1,740,598.60
Overhead & Profit 15 % 261,089.79

Nilai HSPK : 2,001,689.00

57
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
2.01.01.06.01.014 1 m2 Pekerjaan Pasang m2 Nilai HSPK 1,314,313.00
Pintu/Jendela Jalusi Kayu Kamper (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.050 O.H 130,000 6,500.00
1.10.28.02.01.001.002 Kepala Tukang 0.300 O.H 120,000 36,000.00
1.10.28.02.01.001.004 Tukang Kayu 3.000 O.H 110,000 330,000.00
1.10.28.02.01.002.001 Pekerja 1.000 O.H 90,000 90,000.00
Jumlah Harga Tenaga Kerja 462,500.00
Bahan
1.1.7.01.01.05.002.00011 Kayu Kamper, Papan, Uk. 2 x 20 x 0.064 m3 10,449,300 668,755.20
400 cm
1.1.7.01.01.01.022.00271 Lem Kayu 0.500 Kg 23,250 11,625.00
Jumlah Harga Bahan 680,380.20
Peralatan
Jumlah Harga Peralatan
Jumlah 1,142,880.20
Overhead & Profit 15 % 171,432.03

Nilai HSPK : 1,314,313.00


2.01.01.06.01.015 1 m2 Pekerjaan Pasang m2 Nilai HSPK 1,186,135.00
Pintu/Jendela Jalusi Kayu Kruing (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.050 O.H 130,000 6,500.00
1.10.28.02.01.001.002 Kepala Tukang 0.300 O.H 120,000 36,000.00
1.10.28.02.01.001.004 Tukang Kayu 3.000 O.H 110,000 330,000.00
1.10.28.02.01.002.001 Pekerja 1.000 O.H 90,000 90,000.00
Jumlah Harga Tenaga Kerja 462,500.00
Bahan
1.1.7.01.01.05.002.00021 Kayu Kruing, Papan, Uk. 2 x 20 x 400 0.064 m3 8,707,750 557,296.00
cm
1.1.7.01.01.01.022.00271 Lem Kayu 0.500 Kg 23,250 11,625.00
Jumlah Harga Bahan 568,921.00
Peralatan
Jumlah Harga Peralatan
Jumlah 1,031,421.00
Overhead & Profit 15 % 154,713.15

Nilai HSPK : 1,186,135.00


2.01.01.06.01.016 1 m2 Pekerjaan Pasang Pintu m2 Nilai HSPK 1,096,902.00
Plywood Rangkap, Rangka Kayu Jati (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.035 O.H 130,000 4,550.00
1.10.28.02.01.001.002 Kepala Tukang 0.210 O.H 120,000 25,200.00
1.10.28.02.01.001.004 Tukang Kayu 2.100 O.H 110,000 231,000.00
1.10.28.02.01.002.001 Pekerja 0.700 O.H 90,000 63,000.00
Jumlah Harga Tenaga Kerja 323,750.00
Bahan
1.1.7.01.01.05.007.00024 Plywood Tebal 4 mm 1.000 Lembar 123,150 123,150.00
1.1.7.01.01.05.002.00002 Kayu Jati, Papan, Uk. 2 x 20 x 400 cm 0.025 m3 19,788,650 494,716.25

1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.030 Kg 19,550 586.50


1.1.7.01.01.01.022.00271 Lem Kayu 0.500 Kg 23,250 11,625.00
Jumlah Harga Bahan 630,077.75
Peralatan
Jumlah Harga Peralatan
Jumlah 953,827.75
Overhead & Profit 15 % 143,074.16

Nilai HSPK : 1,096,902.00

58
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
2.01.01.06.01.017 1 m2 Pekerjaan Pasang Pintu m2 Nilai HSPK 828,396.00
Plywood Rangkap, Rangka Kamper (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.035 O.H 130,000 4,550.00
1.10.28.02.01.001.002 Kepala Tukang 0.210 O.H 120,000 25,200.00
1.10.28.02.01.001.004 Tukang Kayu 2.100 O.H 110,000 231,000.00
1.10.28.02.01.002.001 Pekerja 0.700 O.H 90,000 63,000.00
Jumlah Harga Tenaga Kerja 323,750.00
Bahan
1.1.7.01.01.05.007.00024 Plywood Tebal 4 mm 1.000 lembar 123,150 123,150.00
1.1.7.01.01.05.002.00011 Kayu Kamper, Papan, Uk. 2 x 20 x 0.025 m3 10,449,300 261,232.50
400 cm
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.030 Kg 19,550 586.50
1.1.7.01.01.01.022.00271 Lem Kayu 0.500 Kg 23,250 11,625.00
Jumlah Harga Bahan 396,594.00
Peralatan
Jumlah Harga Peralatan
Jumlah 720,344.00
Overhead & Profit 15 % 108,051.60

Nilai HSPK : 828,396.00


2.01.01.06.01.018 1 m2 Pekerjaan Pasang Pintu m2 Nilai HSPK 778,327.00
Plywood Rangkap, Rangka Kruing (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.035 O.H 130,000 4,550.00
1.10.28.02.01.001.002 Kepala Tukang 0.210 O.H 120,000 25,200.00
1.10.28.02.01.001.004 Tukang Kayu 2.100 O.H 110,000 231,000.00
1.10.28.02.01.002.001 Pekerja 0.700 O.H 90,000 63,000.00
Jumlah Harga Tenaga Kerja 323,750.00
Bahan
1.1.7.01.01.05.007.00024 Plywood Tebal 4 mm 1.000 lembar 123,150 123,150.00
1.1.7.01.01.05.002.00021 Kayu Kruing, Papan, Uk. 2 x 20 x 400 0.025 m3 8,707,750 217,693.75
cm
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.030 Kg 19,550 586.50
1.1.7.01.01.01.022.00271 Lem Kayu 0.500 Kg 23,250 11,625.00
Jumlah Harga Bahan 353,055.25
Peralatan
Jumlah Harga Peralatan
Jumlah 676,805.25
Overhead & Profit 15 % 101,520.79

Nilai HSPK : 778,327.00


2.01.01.06.01.019 1 m2 Pekerjaan Pasang Pintu m2 Nilai HSPK 1,143,362.00
Teakwood Rangkap, Rangka Kayu (dibulatkan) :
Jati
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.040 O.H 130,000 5,200.00
1.10.28.02.01.001.002 Kepala Tukang 0.240 O.H 120,000 28,800.00
1.10.28.02.01.001.004 Tukang Kayu 2.400 O.H 110,000 264,000.00
1.10.28.02.01.002.001 Pekerja 0.800 O.H 90,000 72,000.00
Jumlah Harga Tenaga Kerja 370,000.00
Bahan
1.1.7.01.01.05.007.00034 Teakwood Tebal 4 mm 1.000 lembar 121,950 121,950.00
1.1.7.01.01.05.002.00002 Kayu Jati, Papan, Uk. 2 x 20 x 400 cm 0.025 m3 19,788,650 494,716.25

1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.030 Kg 19,550 586.50


1.1.7.01.01.01.022.00271 Lem Kayu 0.300 Kg 23,250 6,975.00
Jumlah Harga Bahan 624,227.75
Peralatan
Jumlah Harga Peralatan
Jumlah 994,227.75
Overhead & Profit 15 % 149,134.16

59
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f

Nilai HSPK : 1,143,362.00


2.01.01.06.01.020 1 m2 Pekerjaan Pasang Pintu m2 Nilai HSPK 874,856.00
Teakwood Rangkap, Rangka Kayu (dibulatkan) :
Kamper
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.040 O.H 130,000 5,200.00
1.10.28.02.01.001.002 Kepala Tukang 0.240 O.H 120,000 28,800.00
1.10.28.02.01.001.004 Tukang Kayu 2.400 O.H 110,000 264,000.00
1.10.28.02.01.002.001 Pekerja 0.800 O.H 90,000 72,000.00
Jumlah Harga Tenaga Kerja 370,000.00
Bahan
1.1.7.01.01.05.007.00034 Teakwood Tebal 4 mm 1.000 lembar 121,950 121,950.00
1.1.7.01.01.05.002.00011 Kayu Kamper, Papan, Uk. 2 x 20 x 0.025 m3 10,449,300 261,232.50
400 cm
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.030 Kg 19,550 586.50
1.1.7.01.01.01.022.00271 Lem Kayu 0.300 Kg 23,250 6,975.00
Jumlah Harga Bahan 390,744.00
Peralatan
Jumlah Harga Peralatan
Jumlah 760,744.00
Overhead & Profit 15 % 114,111.60

Nilai HSPK : 874,856.00


2.01.01.06.01.021 1 m2 Pekerjaan Pasang Pintu m2 Nilai HSPK 824,787.00
Teakwood Rangkap, Rangka Kayu (dibulatkan) :
Kruing
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.040 O.H 130,000 5,200.00
1.10.28.02.01.001.002 Kepala Tukang 0.240 O.H 120,000 28,800.00
1.10.28.02.01.001.004 Tukang Kayu 2.400 O.H 110,000 264,000.00
1.10.28.02.01.002.001 Pekerja 0.800 O.H 90,000 72,000.00
Jumlah Harga Tenaga Kerja 370,000.00
Bahan
1.1.7.01.01.05.007.00034 Teakwood Tebal 4 mm 1.000 lembar 121,950 121,950.00
1.1.7.01.01.05.002.00021 Kayu Kruing, Papan, Uk. 2 x 20 x 400 0.025 m3 8,707,750 217,693.75
cm
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.030 Kg 19,550 586.50
1.1.7.01.01.01.022.00271 Lem Kayu 0.300 Kg 23,250 6,975.00
Jumlah Harga Bahan 347,205.25
Peralatan
Jumlah Harga Peralatan
Jumlah 717,205.25
Overhead & Profit 15 % 107,580.79

Nilai HSPK : 824,787.00


2.01.01.06.01.022 1 m2 Pekerjaan Pasang Pintu m2 Nilai HSPK 828,109.00
Tripleks Rangkap, Rangka Kayu (dibulatkan) :
Kamper
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.040 O.H 130,000 5,200.00
1.10.28.02.01.001.002 Kepala Tukang 0.240 O.H 120,000 28,800.00
1.10.28.02.01.001.004 Tukang Kayu 2.400 O.H 110,000 264,000.00
1.10.28.02.01.002.001 Pekerja 0.800 O.H 90,000 72,000.00
Jumlah Harga Tenaga Kerja 370,000.00
Bahan
1.1.7.01.01.05.007.00003 Triplek Uk. 120 cm x 240 cm x 4 mm 1.000 lembar 81,300 81,300.00

1.1.7.01.01.05.002.00011 Kayu Kamper, Papan, Uk. 2 x 20 x 0.025 m3 10,449,300 261,232.50


400 cm
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.030 Kg 19,550 586.50
1.1.7.01.01.01.022.00271 Lem Kayu 0.300 Kg 23,250 6,975.00
Jumlah Harga Bahan 350,094.00
Peralatan

60
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Jumlah Harga Peralatan
Jumlah 720,094.00
Overhead & Profit 15 % 108,014.10

Nilai HSPK : 828,109.00


2.01.01.06.01.023 1 m2 Pekerjaan Pasang Pintu m2 Nilai HSPK 778,039.00
Tripleks Rangkap, Rangka Kayu (dibulatkan) :
Kruing
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.040 O.H 130,000 5,200.00
1.10.28.02.01.001.002 Kepala Tukang 0.240 O.H 120,000 28,800.00
1.10.28.02.01.001.004 Tukang Kayu 2.400 O.H 110,000 264,000.00
1.10.28.02.01.002.001 Pekerja 0.800 O.H 90,000 72,000.00
Jumlah Harga Tenaga Kerja 370,000.00
Bahan
1.1.7.01.01.05.007.00003 Triplek Uk. 120 cm x 240 cm x 4 mm 1.000 lembar 81,300 81,300.00

1.1.7.01.01.05.002.00021 Kayu Kruing, Papan, Uk. 2 x 20 x 400 0.025 m3 8,707,750 217,693.75


cm
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.030 Kg 19,550 586.50
1.1.7.01.01.01.022.00271 Lem Kayu 0.300 Kg 23,250 6,975.00
Jumlah Harga Bahan 306,555.25
Peralatan
Jumlah Harga Peralatan
Jumlah 676,555.25
Overhead & Profit 15 % 101,483.29

Nilai HSPK : 778,039.00


2.01.01.06.01.024 1 m2 Pekerjaan Pasang Pintu Lapis m2 Nilai HSPK 833,054.00
Aluminium, Rangka Kamper (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.040 O.H 130,000 5,200.00
1.10.28.02.01.001.002 Kepala Tukang 0.240 O.H 120,000 28,800.00
1.10.28.02.01.001.004 Tukang Kayu 2.400 O.H 110,000 264,000.00
1.10.28.02.01.002.001 Pekerja 0.800 O.H 90,000 72,000.00
Jumlah Harga Tenaga Kerja 370,000.00
Bahan
1.1.7.01.01.05.007.00014 Triplek Alumunium, Uk. 4 mm 1.000 Lembar 85,600 85,600.00
1.1.7.01.01.05.002.00011 Kayu Kamper, Papan, Uk. 2 x 20 x 0.025 m3 10,449,300 261,232.50
400 cm
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.030 Kg 19,550 586.50
1.1.7.01.01.01.022.00271 Lem Kayu 0.300 Kg 23,250 6,975.00
Jumlah Harga Bahan 354,394.00
Peralatan
Jumlah Harga Peralatan
Jumlah 724,394.00
Overhead & Profit 15 % 108,659.10

Nilai HSPK : 833,054.00


2.01.01.06.02 Kuda - Kuda Dan Rangka Atap

2.01.01.06.02.001 1 m3 Pekerjaan Pasangan Kuda- m3 Nilai HSPK 27,487,007.00


Kuda Kayu Jati Bentang 6 m (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.200 O.H 130,000 26,000.00
1.10.28.02.01.001.002 Kepala Tukang 1.200 O.H 120,000 144,000.00
1.10.28.02.01.001.004 Tukang Kayu 12.000 O.H 110,000 1,320,000.00
1.10.28.02.01.002.001 Pekerja 4.000 O.H 90,000 360,000.00
Jumlah Harga Tenaga Kerja 1,850,000.00
Bahan
1.1.7.01.01.05.002.00001 Kayu Jati, Balok, Uk. 6/12, 8/12, x 1.100 m3 19,788,650 21,767,515.00
400 cm

61
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
1.1.7.01.01.01.008.00009 Besi Plat Strip 15.000 Kg 11,650 174,750.00
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 5.600 Kg 19,550 109,480.00
Jumlah Harga Bahan 22,051,745.00
Peralatan
Jumlah Harga Peralatan
Jumlah 23,901,745.00
Overhead & Profit 15 % 3,585,261.75

Nilai HSPK : 27,487,007.00


2.01.01.06.02.002 1 m3 Pekerjaan Pasangan Kuda- m3 Nilai HSPK 14,204,001.00
Kuda Kayu Kamper Bentang 6 M (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.200 O.H 130,000 26,000.00
1.10.28.02.01.001.002 Kepala Tukang 1.200 O.H 120,000 144,000.00
1.10.28.02.01.001.004 Tukang Kayu 12.000 O.H 110,000 1,320,000.00
1.10.28.02.01.002.001 Pekerja 4.000 O.H 90,000 360,000.00
Jumlah Harga Tenaga Kerja 1,850,000.00
Bahan
1.1.7.01.01.05.002.00009 Kayu Kamper, Balok, Uk. 6 x 12 x 400 1.100 m3 9,288,250 10,217,075.00
cm
1.1.7.01.01.01.008.00009 Besi Plat Strip 15.000 Kg 11,650 174,750.00
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 5.600 Kg 19,550 109,480.00
Jumlah Harga Bahan 10,501,305.00
Peralatan
Jumlah Harga Peralatan
Jumlah 12,351,305.00
Overhead & Profit 15 % 1,852,695.75

Nilai HSPK : 14,204,001.00


2.01.01.06.02.003 1 m3 Pekerjaan Pasangan Kuda- m3 Nilai HSPK 12,000,940.00
Kuda Kayu Kruing Bentang 6 M (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.200 O.H 130,000 26,000.00
1.10.28.02.01.001.002 Kepala Tukang 1.200 O.H 120,000 144,000.00
1.10.28.02.01.001.004 Tukang Kayu 12.000 O.H 110,000 1,320,000.00
1.10.28.02.01.002.001 Pekerja 4.000 O.H 90,000 360,000.00
Jumlah Harga Tenaga Kerja 1,850,000.00
Bahan
1.1.7.01.01.05.002.00019 Kayu Kruing, Balok. Uk. 6 x 12 x 400 1.100 m3 7,546,700 8,301,370.00
cm
1.1.7.01.01.01.008.00009 Besi Plat Strip 15.000 Kg 11,650 174,750.00
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 5.600 Kg 19,550 109,480.00
Jumlah Harga Bahan 8,585,600.00
Peralatan
Jumlah Harga Peralatan
Jumlah 10,435,600.00
Overhead & Profit 15 % 1,565,340.00

Nilai HSPK : 12,000,940.00


2.01.01.06.02.004 1 m3 Pekerjaan Pasangan Kuda- m3 Nilai HSPK 10,532,275.00
Kuda Kayu Meranti Bentang 6 M (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.200 O.H 130,000 26,000.00
1.10.28.02.01.001.002 Kepala Tukang 1.200 O.H 120,000 144,000.00
1.10.28.02.01.001.004 Tukang Kayu 12.000 O.H 110,000 1,320,000.00
1.10.28.02.01.002.001 Pekerja 4.000 O.H 90,000 360,000.00
Jumlah Harga Tenaga Kerja 1,850,000.00
Bahan
1.1.7.01.01.05.002.00028 Kayu Meranti, Balok, Uk. 6 x 12 x 400 1.100 m3 6,385,700 7,024,270.00
cm
1.1.7.01.01.01.008.00009 Besi Plat Strip 15.000 Kg 11,650 174,750.00

62
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 5.600 Kg 19,550 109,480.00
Jumlah Harga Bahan 7,308,500.00
Peralatan
Jumlah Harga Peralatan
Jumlah 9,158,500.00
Overhead & Profit 15 % 1,373,775.00

Nilai HSPK : 10,532,275.00


2.01.01.06.02.005 1 m3 Pekerjaan Pemasangan m3 Nilai HSPK 28,864,615.00
Gording Kayu Jati (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.335 O.H 130,000 43,550.00
1.10.28.02.01.001.002 Kepala Tukang 2.010 O.H 120,000 241,200.00
1.10.28.02.01.001.004 Tukang Kayu 20.100 O.H 110,000 2,211,000.00
1.10.28.02.01.002.001 Pekerja 6.700 O.H 90,000 603,000.00
Jumlah Harga Tenaga Kerja 3,098,750.00
Bahan
1.1.7.01.01.05.002.00001 Kayu Jati, Balok, Uk. 6/12, 8/12, x 1.100 m3 19,788,650 21,767,515.00
400 cm
1.1.7.01.01.01.008.00009 Besi Plat Strip 15.000 Kg 11,650 174,750.00
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 3.000 Kg 19,550 58,650.00
Jumlah Harga Bahan 22,000,915.00
Peralatan
Jumlah Harga Peralatan
Jumlah 25,099,665.00
Overhead & Profit 15 % 3,764,949.75

Nilai HSPK : 28,864,615.00


2.01.01.06.02.006 1 m3 Pekerjaan Pemasangan m3 Nilai HSPK 15,581,609.00
Gording Kayu Kamper (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.335 O.H 130,000 43,550.00
1.10.28.02.01.001.002 Kepala Tukang 2.010 O.H 120,000 241,200.00
1.10.28.02.01.001.004 Tukang Kayu 20.100 O.H 110,000 2,211,000.00
1.10.28.02.01.002.001 Pekerja 6.700 O.H 90,000 603,000.00
Jumlah Harga Tenaga Kerja 3,098,750.00
Bahan
1.1.7.01.01.05.002.00009 Kayu Kamper, Balok, Uk. 6 x 12 x 400 1.100 m3 9,288,250 10,217,075.00
cm
1.1.7.01.01.01.008.00009 Besi Plat Strip 15.000 Kg 11,650 174,750.00
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 3.000 Kg 19,550 58,650.00
Jumlah Harga Bahan 10,450,475.00
Peralatan
Jumlah Harga Peralatan
Jumlah 13,549,225.00
Overhead & Profit 15 % 2,032,383.75

Nilai HSPK : 15,581,609.00


2.01.01.06.02.007 1 m3 Pekerjaan Pemasangan m3 Nilai HSPK 13,378,548.00
Gording Kayu Kruing (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.335 O.H 130,000 43,550.00
1.10.28.02.01.001.002 Kepala Tukang 2.010 O.H 120,000 241,200.00
1.10.28.02.01.001.004 Tukang Kayu 20.100 O.H 110,000 2,211,000.00
1.10.28.02.01.002.001 Pekerja 6.700 O.H 90,000 603,000.00
Jumlah Harga Tenaga Kerja 3,098,750.00
Bahan
1.1.7.01.01.05.002.00019 Kayu Kruing, Balok. Uk. 6 x 12 x 400 1.100 m3 7,546,700 8,301,370.00
cm
1.1.7.01.01.01.008.00009 Besi Plat Strip 15.000 Kg 11,650 174,750.00
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 3.000 Kg 19,550 58,650.00
Jumlah Harga Bahan 8,534,770.00
Peralatan
Jumlah Harga Peralatan

63
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Jumlah 11,633,520.00
Overhead & Profit 15 % 1,745,028.00

Nilai HSPK : 13,378,548.00


2.01.01.06.02.008 1 m3 Pekerjaan Pemasangan m3 Nilai HSPK 11,909,883.00
Gording Kayu Meranti (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.335 O.H 130,000 43,550.00
1.10.28.02.01.001.002 Kepala Tukang 2.010 O.H 120,000 241,200.00
1.10.28.02.01.001.004 Tukang Kayu 20.100 O.H 110,000 2,211,000.00
1.10.28.02.01.002.001 Pekerja 6.700 O.H 90,000 603,000.00
Jumlah Harga Tenaga Kerja 3,098,750.00
Bahan
1.1.7.01.01.05.002.00028 Kayu Meranti, Balok, Uk. 6 x 12 x 400 1.100 m3 6,385,700 7,024,270.00
cm
1.1.7.01.01.01.008.00009 Besi Plat Strip 15.000 Kg 11,650 174,750.00
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 3.000 Kg 19,550 58,650.00
Jumlah Harga Bahan 7,257,670.00
Peralatan
Jumlah Harga Peralatan
Jumlah 10,356,420.00
Overhead & Profit 15 % 1,553,463.00

Nilai HSPK : 11,909,883.00


2.01.01.06.02.009 1 m2 Pekerjaan Pasang Rangka Atap m2 Nilai HSPK 124,634.00
Genteng Kodok (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.005 O.H 130,000 650.00
1.10.28.02.01.001.002 Kepala Tukang 0.010 O.H 120,000 1,200.00
1.10.28.02.01.001.004 Tukang Kayu 0.100 O.H 110,000 11,000.00
1.10.28.02.01.002.001 Pekerja 0.100 O.H 90,000 9,000.00
Jumlah Harga Tenaga Kerja 21,850.00
Bahan
1.1.7.01.01.05.002.00023 Kayu Kruing, Reng, Uk. 2 x 3 x 400 cm 0.012 m3 6,966,200 83,594.40

1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.150 Kg 19,550 2,932.50


Jumlah Harga Bahan 86,526.90
Peralatan
Jumlah Harga Peralatan
Jumlah 108,376.90
Overhead & Profit 15 % 16,256.54

Nilai HSPK : 124,634.00


2.01.01.06.02.010 1 m2 Pekerjaan Pasang Rangka Atap m2 Nilai HSPK 440,651.00
Genteng Keramik (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.005 O.H 130,000 650.00
1.10.28.02.01.001.002 Kepala Tukang 0.010 O.H 120,000 1,200.00
1.10.28.02.01.001.004 Tukang Kayu 0.100 O.H 110,000 11,000.00
1.10.28.02.01.002.001 Pekerja 0.100 O.H 90,000 9,000.00
Jumlah Harga Tenaga Kerja 21,850.00
Bahan
1.1.7.01.01.05.002.00025 Kayu Kruing, Kaso, Uk. 5 x 7 x 400 cm 0.014 m3 7,546,700 105,653.80

1.1.7.01.01.05.002.00023 Kayu Kruing, Reng, Uk. 2 x 3 x 400 cm 0.036 m3 6,966,200 250,783.20

1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.250 Kg 19,550 4,887.50


Jumlah Harga Bahan 361,324.50
Peralatan
Jumlah Harga Peralatan
Jumlah 383,174.50
Overhead & Profit 15 % 57,476.18

64
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Nilai HSPK : 440,651.00
2.01.01.06.02.011 1 m2 Pekerjaan Pasang Rangka Atap m2 Nilai HSPK 608,885.00
Genteng Beton (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.005 O.H 130,000 650.00
1.10.28.02.01.001.002 Kepala Tukang 0.010 O.H 120,000 1,200.00
1.10.28.02.01.001.004 Tukang Kayu 0.100 O.H 110,000 11,000.00
1.10.28.02.01.002.001 Pekerja 0.100 O.H 90,000 9,000.00
Jumlah Harga Tenaga Kerja 21,850.00
Bahan
1.1.7.01.01.05.002.00025 Kayu Kruing, Kaso, Uk. 5 x 7 x 400 cm 0.014 m3 7,546,700 105,653.80

1.1.7.01.01.05.002.00023 Kayu Kruing, Reng, Uk. 2 x 3 x 400 cm 0.057 m3 6,966,200 397,073.40

1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.250 Kg 19,550 4,887.50


Jumlah Harga Bahan 507,614.70
Peralatan
Jumlah Harga Peralatan
Jumlah 529,464.70
Overhead & Profit 15 % 79,419.71

Nilai HSPK : 608,885.00


2.01.01.06.03 Rangka Langit - Langit Dan Listplank

2.01.01.06.03.001 1 m2 Pekerjaan Pasang Rangka m2 Nilai HSPK 246,072.00


Langit - Langit Kayu Jati (100x100) (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.075 O.H 130,000 9,750.00
1.10.28.02.01.001.002 Kepala Tukang 0.025 O.H 120,000 3,000.00
1.10.28.02.01.001.004 Tukang Kayu 0.250 O.H 110,000 27,500.00
1.10.28.02.01.002.001 Pekerja 0.150 O.H 90,000 13,500.00
Jumlah Harga Tenaga Kerja 53,750.00
Bahan
1.1.7.01.01.05.002.00005 Kayu Jati, Kaso, 3/5, 4/6, 5/7, x 400 0.012 m3 13,189,200 158,270.40
cm
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.100 Kg 19,550 1,955.00
Jumlah Harga Bahan 160,225.40
Peralatan
Jumlah Harga Peralatan
Jumlah 213,975.40
Overhead & Profit 15 % 32,096.31

Nilai HSPK : 246,072.00


2.01.01.06.03.002 1 m2 Pekerjaan Pasang Rangka m2 Nilai HSPK 306,905.00
Langit - Langit Kayu Jati (50x100) (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.075 O.H 130,000 9,750.00
1.10.28.02.01.001.002 Kepala Tukang 0.030 O.H 120,000 3,600.00
1.10.28.02.01.001.004 Tukang Kayu 0.300 O.H 110,000 33,000.00
1.10.28.02.01.002.001 Pekerja 0.150 O.H 90,000 13,500.00
Jumlah Harga Tenaga Kerja 59,850.00
Bahan
1.1.7.01.01.05.002.00005 Kayu Jati, Kaso, 3/5, 4/6, 5/7, x 400 0.0154 m3 13,189,200 203,113.68
cm
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.200 Kg 19,550 3,910.00
Jumlah Harga Bahan 207,023.68
Peralatan
Jumlah Harga Peralatan
Jumlah 266,873.68
Overhead & Profit 15 % 40,031.05

Nilai HSPK : 306,905.00

65
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
2.01.01.06.03.003 1 m2 Pekerjaan Pasang Rangka m2 Nilai HSPK 317,138.00
Langit - Langit Kayu Jati (60x60) (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.010 O.H 130,000 1,300.00
1.10.28.02.01.001.002 Kepala Tukang 0.030 O.H 120,000 3,600.00
1.10.28.02.01.001.004 Tukang Kayu 0.300 O.H 110,000 33,000.00
1.10.28.02.01.002.001 Pekerja 0.200 O.H 90,000 18,000.00
Jumlah Harga Tenaga Kerja 55,900.00
Bahan
1.1.7.01.01.05.002.00005 Kayu Jati, Kaso, 3/5, 4/6, 5/7, x 400 0.0163 m3 13,189,200 214,983.96
cm
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.250 Kg 19,550 4,887.50
Jumlah Harga Bahan 219,871.46
Peralatan
Jumlah Harga Peralatan
Jumlah 275,771.46
Overhead & Profit 15 % 41,365.72

Nilai HSPK : 317,138.00


2.01.01.06.03.004 1 m2 Pekerjaan Pasang Rangka m2 Nilai HSPK 184,228.00
Langit - Langit Kayu Kamper (dibulatkan) :
(100x100)
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.075 O.H 130,000 9,750.00
1.10.28.02.01.001.002 Kepala Tukang 0.025 O.H 120,000 3,000.00
1.10.28.02.01.001.004 Tukang Kayu 0.250 O.H 110,000 27,500.00
1.10.28.02.01.002.001 Pekerja 0.150 O.H 90,000 13,500.00
Jumlah Harga Tenaga Kerja 53,750.00
Bahan
1.1.7.01.01.05.002.00017 Kayu Kamper, Kaso, Uk. 5 x 7 x 400 0.012 m3 8,707,750 104,493.00
cm
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.100 Kg 19,550 1,955.00
Jumlah Harga Bahan 106,448.00
Peralatan
Jumlah Harga Peralatan
Jumlah 160,198.00
Overhead & Profit 15 % 24,029.70

Nilai HSPK : 184,228.00


2.01.01.06.03.005 1 m2 Pekerjaan Pasang Rangka m2 Nilai HSPK 227,539.00
Langit - Langit Kayu Kamper (dibulatkan) :
(50x100)
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.075 O.H 130,000 9,750.00
1.10.28.02.01.001.002 Kepala Tukang 0.030 O.H 120,000 3,600.00
1.10.28.02.01.001.004 Tukang Kayu 0.300 O.H 110,000 33,000.00
1.10.28.02.01.002.001 Pekerja 0.150 O.H 90,000 13,500.00
Jumlah Harga Tenaga Kerja 59,850.00
Bahan
1.1.7.01.01.05.002.00017 Kayu Kamper, Kaso, Uk. 5 x 7 x 400 0.015 m3 8,707,750 134,099.35
cm
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.200 Kg 19,550 3,910.00
Jumlah Harga Bahan 138,009.35
Peralatan
Jumlah Harga Peralatan
Jumlah 197,859.35
Overhead & Profit 15 % 29,678.90

Nilai HSPK : 227,539.00


2.01.01.06.03.006 1 m2 Pekerjaan Pasang Rangka m2 Nilai HSPK 233,133.00
Langit - Langit Kayu Kamper (60x60) (dibulatkan) :

Tenaga Kerja

66
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
1.10.28.02.01.001.001 Mandor 0.010 O.H 130,000 1,300.00
1.10.28.02.01.001.002 Kepala Tukang 0.030 O.H 120,000 3,600.00
1.10.28.02.01.001.004 Tukang Kayu 0.300 O.H 110,000 33,000.00
1.10.28.02.01.002.001 Pekerja 0.200 O.H 90,000 18,000.00
Jumlah Harga Tenaga Kerja 55,900.00
Bahan
1.1.7.01.01.05.002.00017 Kayu Kamper, Kaso, Uk. 5 x 7 x 400 0.0163 m3 8,707,750 141,936.33
cm
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.250 Kg 19,550 4,887.50
Jumlah Harga Bahan 146,823.83
Peralatan
Jumlah Harga Peralatan
Jumlah 202,723.83
Overhead & Profit 15 % 30,408.57

Nilai HSPK : 233,133.00


2.01.01.06.03.007 1 m2 Pekerjaan Pasang Rangka m2 Nilai HSPK 168,206.00
Langit - Langit Kayu Kruing (dibulatkan) :
(100x100)
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.075 O.H 130,000 9,750.00
1.10.28.02.01.001.002 Kepala Tukang 0.025 O.H 120,000 3,000.00
1.10.28.02.01.001.004 Tukang Kayu 0.250 O.H 110,000 27,500.00
1.10.28.02.01.002.001 Pekerja 0.150 O.H 90,000 13,500.00
Jumlah Harga Tenaga Kerja 53,750.00
Bahan
1.1.7.01.01.05.002.00025 Kayu Kruing, Kaso, Uk. 5 x 7 x 400 cm 0.012 m3 7,546,700 90,560.40

1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.100 Kg 19,550 1,955.00


Jumlah Harga Bahan 92,515.40
Peralatan
Jumlah Harga Peralatan
Jumlah 146,265.40
Overhead & Profit 15 % 21,939.81

Nilai HSPK : 168,206.00


2.01.01.06.03.008 1 m2 Pekerjaan Pasang Rangka m2 Nilai HSPK 206,977.00
Langit - Langit Kayu Kruing (50x100) (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.075 O.H 130,000 9,750.00
1.10.28.02.01.001.002 Kepala Tukang 0.030 O.H 120,000 3,600.00
1.10.28.02.01.001.004 Tukang Kayu 0.300 O.H 110,000 33,000.00
1.10.28.02.01.002.001 Pekerja 0.150 O.H 90,000 13,500.00
Jumlah Harga Tenaga Kerja 59,850.00
Bahan
1.1.7.01.01.05.002.00025 Kayu Kruing, Kaso, Uk. 5 x 7 x 400 cm 0.015 m3 7,546,700 116,219.18

1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.200 Kg 19,550 3,910.00


Jumlah Harga Bahan 120,129.18
Peralatan
Jumlah Harga Peralatan
Jumlah 179,979.18
Overhead & Profit 15 % 26,996.88

Nilai HSPK : 206,977.00


2.01.01.06.03.009 1 m2 Pekerjaan Pasang Rangka m2 Nilai HSPK 211,369.00
Langit - Langit Kayu Kruing (60x60) (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.010 O.H 130,000 1,300.00
1.10.28.02.01.001.002 Kepala Tukang 0.030 O.H 120,000 3,600.00
1.10.28.02.01.001.004 Tukang Kayu 0.300 O.H 110,000 33,000.00
1.10.28.02.01.002.001 Pekerja 0.200 O.H 90,000 18,000.00

67
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Jumlah Harga Tenaga Kerja 55,900.00
Bahan
1.1.7.01.01.05.002.00025 Kayu Kruing, Kaso, Uk. 5 x 7 x 400 cm 0.016 m3 7,546,700 123,011.21

1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.250 Kg 19,550 4,887.50


Jumlah Harga Bahan 127,898.71
Peralatan
Jumlah Harga Peralatan
Jumlah 183,798.71
Overhead & Profit 15 % 27,569.81

Nilai HSPK : 211,369.00


2.01.01.06.03.010 1 m2 Pekerjaan Pasang Rangka m2 Nilai HSPK 144,172.00
Langit - Langit Kayu Meranti (dibulatkan) :
(100x100)
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.075 O.H 130,000 9,750.00
1.10.28.02.01.001.002 Kepala Tukang 0.025 O.H 120,000 3,000.00
1.10.28.02.01.001.004 Tukang Kayu 0.250 O.H 110,000 27,500.00
1.10.28.02.01.002.001 Pekerja 0.150 O.H 90,000 13,500.00
Jumlah Harga Tenaga Kerja 53,750.00
Bahan
1.1.7.01.01.05.002.00036 Kayu Meranti, Kaso, Uk. 5 x 7 cm 0.012 m3 5,805,150 69,661.80
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.100 Kg 19,550 1,955.00
Jumlah Harga Bahan 71,616.80
Peralatan
Jumlah Harga Peralatan
Jumlah 125,366.80
Overhead & Profit 15 % 18,805.02

Nilai HSPK : 144,172.00


2.01.01.06.03.011 1 m2 Pekerjaan Pasang Rangka m2 Nilai HSPK 176,134.00
Langit - Langit Kayu Meranti (dibulatkan) :
(50x100)
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.075 O.H 130,000 9,750.00
1.10.28.02.01.001.002 Kepala Tukang 0.030 O.H 120,000 3,600.00
1.10.28.02.01.001.004 Tukang Kayu 0.300 O.H 110,000 33,000.00
1.10.28.02.01.002.001 Pekerja 0.150 O.H 90,000 13,500.00
Jumlah Harga Tenaga Kerja 59,850.00
Bahan
1.1.7.01.01.05.002.00036 Kayu Meranti, Kaso, Uk. 5 x 7 cm 0.015 m3 5,805,150 89,399.31
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.200 Kg 19,550 3,910.00
Jumlah Harga Bahan 93,309.31
Peralatan
Jumlah Harga Peralatan
Jumlah 153,159.31
Overhead & Profit 15 % 22,973.90

Nilai HSPK : 176,134.00


2.01.01.06.03.012 1 m2 Pekerjaan Pasang Rangka m2 Nilai HSPK 178,724.00
Langit - Langit Kayu Meranti (60x60) (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.010 O.H 130,000 1,300.00
1.10.28.02.01.001.002 Kepala Tukang 0.030 O.H 120,000 3,600.00
1.10.28.02.01.001.004 Tukang Kayu 0.300 O.H 110,000 33,000.00
1.10.28.02.01.002.001 Pekerja 0.200 O.H 90,000 18,000.00
Jumlah Harga Tenaga Kerja 55,900.00
Bahan
1.1.7.01.01.05.002.00036 Kayu Meranti, Kaso, Uk. 5 x 7 cm 0.016 m3 5,805,150 94,623.95
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.250 Kg 19,550 4,887.50
Jumlah Harga Bahan 99,511.45
Peralatan

68
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Jumlah Harga Peralatan
Jumlah 155,411.45
Overhead & Profit 15 % 23,311.72

Nilai HSPK : 178,724.00


2.01.01.06.03.013 1 m' Pekerjaan Pasang Listplank m' Nilai HSPK 287,181.00
Kayu Jati 3/20 (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.005 O.H 130,000 650.00
1.10.28.02.01.001.002 Kepala Tukang 0.020 O.H 120,000 2,400.00
1.10.28.02.01.001.004 Tukang Kayu 0.200 O.H 110,000 22,000.00
1.10.28.02.01.002.001 Pekerja 0.100 O.H 90,000 9,000.00
Jumlah Harga Tenaga Kerja 34,050.00
Bahan
1.1.7.01.01.05.002.00002 Kayu Jati, Papan, Uk. 2 x 20 x 400 cm 0.0108 m3 19,788,650 213,717.42

1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.100 Kg 19,550 1,955.00


Jumlah Harga Bahan 215,672.42
Peralatan
Jumlah Harga Peralatan
Jumlah 249,722.42
Overhead & Profit 15 % 37,458.36

Nilai HSPK : 287,181.00


2.01.01.06.03.014 1 m' Pekerjaan Pasang Listplank m' Nilai HSPK 171,187.00
Kayu Kamper 3/20 (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.005 O.H 130,000 650.00
1.10.28.02.01.001.002 Kepala Tukang 0.020 O.H 120,000 2,400.00
1.10.28.02.01.001.004 Tukang Kayu 0.200 O.H 110,000 22,000.00
1.10.28.02.01.002.001 Pekerja 0.100 O.H 90,000 9,000.00
Jumlah Harga Tenaga Kerja 34,050.00
Bahan
1.1.7.01.01.05.002.00011 Kayu Kamper, Papan, Uk. 2 x 20 x 0.0108 m3 10,449,300 112,852.44
400 cm
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.100 Kg 19,550 1,955.00
Jumlah Harga Bahan 114,807.44
Peralatan
Jumlah Harga Peralatan
Jumlah 148,857.44
Overhead & Profit 15 % 22,328.62

Nilai HSPK : 171,187.00


2.01.01.06.03.015 1 m' Pekerjaan Pasang Listplank m' Nilai HSPK 290,609.00
Kayu Jati 3/30 (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.005 O.H 130,000 650.00
1.10.28.02.01.001.002 Kepala Tukang 0.020 O.H 120,000 2,400.00
1.10.28.02.01.001.004 Tukang Kayu 0.200 O.H 110,000 22,000.00
1.10.28.02.01.002.001 Pekerja 0.100 O.H 90,000 9,000.00
Jumlah Harga Tenaga Kerja 34,050.00
Bahan
1.1.7.01.01.05.002.00002 Kayu Jati, Papan, Uk. 2 x 20 x 400 cm 0.011 m3 19,788,650 217,675.15

1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.050 Kg 19,550 977.50


Jumlah Harga Bahan 218,652.65
Peralatan
Jumlah Harga Peralatan
Jumlah 252,702.65
Overhead & Profit 15 % 37,905.40

Nilai HSPK : 290,609.00


2.01.01.06.03.016 1 m' Pekerjaan Pasang Listplank m' Nilai HSPK 172,466.00
Kayu Kamper 3/30 (dibulatkan) :

69
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.005 O.H 130,000 650.00
1.10.28.02.01.001.002 Kepala Tukang 0.020 O.H 120,000 2,400.00
1.10.28.02.01.001.004 Tukang Kayu 0.200 O.H 110,000 22,000.00
1.10.28.02.01.002.001 Pekerja 0.100 O.H 90,000 9,000.00
Jumlah Harga Tenaga Kerja 34,050.00
Bahan
1.1.7.01.01.05.002.00011 Kayu Kamper, Papan, Uk. 2 x 20 x 0.011 m3 10,449,300 114,942.30
400 cm
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.050 Kg 19,550 977.50
Jumlah Harga Bahan 115,919.80
Peralatan
Jumlah Harga Peralatan
Jumlah 149,969.80
Overhead & Profit 15 % 22,495.47

Nilai HSPK : 172,466.00


2.01.01.06.03.017 1 m' Pekerjaan Pasang Listplank m' Nilai HSPK 237,404.00
Kayu Kamper 2 X 3/20 Cm (Double) (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.075 O.H 130,000 9,750.00
1.10.28.02.01.001.002 Kepala Tukang 0.025 O.H 120,000 3,000.00
1.10.28.02.01.001.004 Tukang Kayu 0.250 O.H 110,000 27,500.00
1.10.28.02.01.002.001 Pekerja 0.150 O.H 90,000 13,500.00
Jumlah Harga Tenaga Kerja 53,750.00
Bahan
1.1.7.01.01.05.002.00011 Kayu Kamper, Papan, Uk. 2 x 20 x 0.015 m3 10,449,300 151,514.85
400 cm
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.060 Kg 19,550 1,173.00
Jumlah Harga Bahan 152,687.85
Peralatan
Jumlah Harga Peralatan
Jumlah 206,437.85
Overhead & Profit 15 % 30,965.68

Nilai HSPK : 237,404.00


2.01.01.06.03.018 1 m' Pekerjaan Pasang Listplank m' Nilai HSPK 136,548.00
Kayu Kamper 2 X 2/20 Cm (Double) (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.050 O.H 130,000 6,500.00
1.10.28.02.01.001.002 Kepala Tukang 0.010 O.H 120,000 1,200.00
1.10.28.02.01.001.004 Tukang Kayu 0.100 O.H 110,000 11,000.00
1.10.28.02.01.002.001 Pekerja 0.100 O.H 90,000 9,000.00
Jumlah Harga Tenaga Kerja 27,700.00
Bahan
1.1.7.01.01.05.002.00011 Kayu Kamper, Papan, Uk. 2 x 20 x 0.009 m3 10,449,300 89,863.98
400 cm
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.060 Kg 19,550 1,173.00
Jumlah Harga Bahan 91,036.98
Peralatan
Jumlah Harga Peralatan
Jumlah 118,736.98
Overhead & Profit 15 % 17,810.55

Nilai HSPK : 136,548.00


2.01.01.06.03.019 1 m' Pekerjaan Pasang Listplank m' Nilai HSPK 121,327.00
Kayu Borneo 2 X 2/20 Cm (Double) (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.050 O.H 130,000 6,500.00
1.10.28.02.01.001.002 Kepala Tukang 0.010 O.H 120,000 1,200.00
1.10.28.02.01.001.004 Tukang Kayu 0.100 O.H 110,000 11,000.00

70
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
1.10.28.02.01.002.001 Pekerja 0.100 O.H 90,000 9,000.00
Jumlah Harga Tenaga Kerja 27,700.00
Bahan
1.1.7.01.01.05.002.00021 Kayu Kruing, Papan, Uk. 2 x 20 x 400 0.009 m3 8,707,750 76,628.20
cm
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.060 Kg 19,550 1,173.00
Jumlah Harga Bahan 77,801.20
Peralatan
Jumlah Harga Peralatan
Jumlah 105,501.20
Overhead & Profit 15 % 15,825.18

Nilai HSPK : 121,327.00


2.01.01.06.04 Rangka Dinding Partisi
2.01.01.06.04.001 1 m2 Pekerjaan Pasang Rangka m2 Nilai HSPK 720,423.00
Dinding Pemisah Kayu Jati (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.008 O.H 130,000 1,040.00
1.10.28.02.01.001.002 Kepala Tukang 0.045 O.H 120,000 5,400.00
1.10.28.02.01.001.004 Tukang Kayu 0.450 O.H 110,000 49,500.00
1.10.28.02.01.002.001 Pekerja 0.150 O.H 90,000 13,500.00
Jumlah Harga Tenaga Kerja 69,440.00
Bahan
1.1.7.01.01.05.002.00001 Kayu Jati, Balok, Uk. 6/12, 8/12, x 0.028 m3 19,788,650 554,082.20
400 cm
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.150 Kg 19,550 2,932.50
Jumlah Harga Bahan 557,014.70
Peralatan
Jumlah Harga Peralatan
Jumlah 626,454.70
Overhead & Profit 15 % 93,968.21

Nilai HSPK : 720,423.00


2.01.01.06.04.002 1 m2 Pekerjaan Pasang Dinding m2 Nilai HSPK 865,068.00
Pemisah Teakwood Rangkap Rangka (dibulatkan) :
Kayu Jati
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.010 O.H 130,000 1,300.00
1.10.28.02.01.001.002 Kepala Tukang 0.060 O.H 120,000 7,200.00
1.10.28.02.01.001.004 Tukang Kayu 0.600 O.H 110,000 66,000.00
1.10.28.02.01.002.001 Pekerja 0.200 O.H 90,000 18,000.00
Jumlah Harga Tenaga Kerja 92,500.00
Bahan
1.1.7.01.01.05.002.00001 Kayu Jati, Balok, Uk. 6/12, 8/12, x 0.028 m3 19,788,650 554,082.20
400 cm
1.1.7.01.01.05.007.00030 Teakwood Uk. 120 cm x 240 cm x 4 0.860 Lembar 104,300 89,698.00
mm
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.150 Kg 19,550 2,932.50
1.1.7.01.01.01.022.00271 Lem Kayu 0.560 Kg 23,250 13,020.00
Jumlah Harga Bahan 659,732.70
Peralatan
Jumlah Harga Peralatan
Jumlah 752,232.70
Overhead & Profit 15 % 112,834.91

Nilai HSPK : 865,068.00


2.01.01.06.04.003 1 m2 Pekerjaan Pasang Dinding m2 Nilai HSPK 865,068.00
Pemisah Plywood Rangkap Rangka (dibulatkan) :
Kayu Jati
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.010 O.H 130,000 1,300.00
1.10.28.02.01.001.002 Kepala Tukang 0.060 O.H 120,000 7,200.00
1.10.28.02.01.001.004 Tukang Kayu 0.600 O.H 110,000 66,000.00

71
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
1.10.28.02.01.002.001 Pekerja 0.200 O.H 90,000 18,000.00
Jumlah Harga Tenaga Kerja 92,500.00
Bahan
1.1.7.01.01.05.002.00001 Kayu Jati, Balok, Uk. 6/12, 8/12, x 0.028 m3 19,788,650 554,082.20
400 cm
1.1.7.01.01.05.007.00030 Teakwood Uk. 120 cm x 240 cm x 4 0.860 Lembar 104,300 89,698.00
mm
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.150 Kg 19,550 2,932.50
1.1.7.01.01.01.022.00271 Lem Kayu 0.560 Kg 23,250 13,020.00
Jumlah Harga Bahan 659,732.70
Peralatan
Jumlah Harga Peralatan
Jumlah 752,232.70
Overhead & Profit 15 % 112,834.91

Nilai HSPK : 865,068.00


2.01.01.06.04.004 1 m2 Pekerjaan Pasang Rangka m2 Nilai HSPK 382,311.00
Dinding Pemisah Kayu Kamper (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.008 O.H 130,000 1,040.00
1.10.28.02.01.001.002 Kepala Tukang 0.045 O.H 120,000 5,400.00
1.10.28.02.01.001.004 Tukang Kayu 0.450 O.H 110,000 49,500.00
1.10.28.02.01.002.001 Pekerja 0.150 O.H 90,000 13,500.00
Jumlah Harga Tenaga Kerja 69,440.00
Bahan
1.1.7.01.01.05.002.00009 Kayu Kamper, Balok, Uk. 6 x 12 x 400 0.028 m3 9,288,250 260,071.00
cm
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.150 Kg 19,550 2,932.50
Jumlah Harga Bahan 263,003.50
Peralatan
Jumlah Harga Peralatan
Jumlah 332,443.50
Overhead & Profit 15 % 49,866.53

Nilai HSPK : 382,311.00


2.01.01.06.04.005 1 m2 Pekerjaan Pasang Dinding m2 Nilai HSPK 500,436.00
Pemisah Teakwood Rangkap Rangka (dibulatkan) :
Kayu Kamper

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.008 O.H 130,000 1,040.00
1.10.28.02.01.001.002 Kepala Tukang 0.045 O.H 120,000 5,400.00
1.10.28.02.01.001.004 Tukang Kayu 0.450 O.H 110,000 49,500.00
1.10.28.02.01.002.001 Pekerja 0.150 O.H 90,000 13,500.00
Jumlah Harga Tenaga Kerja 69,440.00
Bahan
1.1.7.01.01.05.002.00009 Kayu Kamper, Balok, Uk. 6 x 12 x 400 0.028 m3 9,288,250 260,071.00
cm
1.1.7.01.01.05.007.00030 Teakwood Uk. 120 cm x 240 cm x 4 0.860 Lembar 104,300 89,698.00
mm
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.150 Kg 19,550 2,932.50
1.1.7.01.01.01.022.00271 Lem Kayu 0.560 Kg 23,250 13,020.00
Jumlah Harga Bahan 365,721.50
Peralatan
Jumlah Harga Peralatan
Jumlah 435,161.50
Overhead & Profit 15 % 65,274.23

Nilai HSPK : 500,436.00


2.01.01.06.04.006 1 m2 Pekerjaan Pasang Dinding m2 Nilai HSPK 526,955.00
Pemisah Plywood Rangkap Rangka (dibulatkan) :
Kayu Kamper

72
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.010 O.H 130,000 1,300.00
1.10.28.02.01.001.002 Kepala Tukang 0.060 O.H 120,000 7,200.00
1.10.28.02.01.001.004 Tukang Kayu 0.600 O.H 110,000 66,000.00
1.10.28.02.01.002.001 Pekerja 0.200 O.H 90,000 18,000.00
Jumlah Harga Tenaga Kerja 92,500.00
Bahan
1.1.7.01.01.05.002.00009 Kayu Kamper, Balok, Uk. 6 x 12 x 400 0.028 m3 9,288,250 260,071.00
cm
1.1.7.01.01.05.007.00030 Teakwood Uk. 120 cm x 240 cm x 4 0.860 Lembar 104,300 89,698.00
mm
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.150 Kg 19,550 2,932.50
1.1.7.01.01.01.022.00271 Lem Kayu 0.560 Kg 23,250 13,020.00
Jumlah Harga Bahan 365,721.50
Peralatan
Jumlah Harga Peralatan
Jumlah 458,221.50
Overhead & Profit 15 % 68,733.23

Nilai HSPK : 526,955.00


2.01.01.06.04.007 1 m2 Pekerjaan Pasang Rangka m2 Nilai HSPK 326,233.00
Dinding Pemisah Kayu Kruing (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.008 O.H 130,000 1,040.00
1.10.28.02.01.001.002 Kepala Tukang 0.045 O.H 120,000 5,400.00
1.10.28.02.01.001.004 Tukang Kayu 0.450 O.H 110,000 49,500.00
1.10.28.02.01.002.001 Pekerja 0.150 O.H 90,000 13,500.00
Jumlah Harga Tenaga Kerja 69,440.00
Bahan
1.1.7.01.01.05.002.00019 Kayu Kruing, Balok. Uk. 6 x 12 x 400 0.028 m3 7,546,700 211,307.60
cm
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.150 Kg 19,550 2,932.50
Jumlah Harga Bahan 214,240.10
Peralatan
Jumlah Harga Peralatan
Jumlah 283,680.10
Overhead & Profit 15 % 42,552.02

Nilai HSPK : 326,233.00


2.01.01.06.04.008 1 m2 Pekerjaan Pasang Dinding m2 Nilai HSPK 444,358.00
Pemisah Teakwood Rangkap Rangka (dibulatkan) :
Kayu Kruing
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.008 O.H 130,000 1,040.00
1.10.28.02.01.001.002 Kepala Tukang 0.045 O.H 120,000 5,400.00
1.10.28.02.01.001.004 Tukang Kayu 0.450 O.H 110,000 49,500.00
1.10.28.02.01.002.001 Pekerja 0.150 O.H 90,000 13,500.00
Jumlah Harga Tenaga Kerja 69,440.00
Bahan
1.1.7.01.01.05.002.00019 Kayu Kruing, Balok. Uk. 6 x 12 x 400 0.028 m3 7,546,700 211,307.60
cm
1.1.7.01.01.05.007.00030 Teakwood Uk. 120 cm x 240 cm x 4 0.860 Lembar 104,300 89,698.00
mm
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.150 Kg 19,550 2,932.50
1.1.7.01.01.01.022.00271 Lem Kayu 0.560 Kg 23,250 13,020.00
Jumlah Harga Bahan 316,958.10
Peralatan
Jumlah Harga Peralatan
Jumlah 386,398.10
Overhead & Profit 15 % 57,959.72

Nilai HSPK : 444,358.00

73
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
2.01.01.06.04.009 1 m2 Pekerjaan Pasang Dinding m2 Nilai HSPK 470,877.00
Pemisah Plywood Rangkap Rangka (dibulatkan) :
Kayu Kruing
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.010 O.H 130,000 1,300.00
1.10.28.02.01.001.002 Kepala Tukang 0.060 O.H 120,000 7,200.00
1.10.28.02.01.001.004 Tukang Kayu 0.600 O.H 110,000 66,000.00
1.10.28.02.01.002.001 Pekerja 0.200 O.H 90,000 18,000.00
Jumlah Harga Tenaga Kerja 92,500.00
Bahan
1.1.7.01.01.05.002.00019 Kayu Kruing, Balok. Uk. 6 x 12 x 400 0.028 m3 7,546,700 211,307.60
cm
1.1.7.01.01.05.007.00030 Teakwood Uk. 120 cm x 240 cm x 4 0.860 Lembar 104,300 89,698.00
mm
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.150 Kg 19,550 2,932.50
1.1.7.01.01.01.022.00271 Lem Kayu 0.560 Kg 23,250 13,020.00
Jumlah Harga Bahan 316,958.10
Peralatan
Jumlah Harga Peralatan
Jumlah 409,458.10
Overhead & Profit 15 % 61,418.72

Nilai HSPK : 470,877.00


2.01.01.06.04.010 1 m2 Pekerjaan Pasang Dinding m2 Nilai HSPK 448,130.00
Pemisah Gypsum Rangkap Rangka (dibulatkan) :
Kayu Kruing
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.010 O.H 130,000 1,300.00
1.10.28.02.01.001.002 Kepala Tukang 0.060 O.H 120,000 7,200.00
1.10.28.02.01.001.004 Tukang Kayu 0.600 O.H 110,000 66,000.00
1.10.28.02.01.002.001 Pekerja 0.200 O.H 90,000 18,000.00
Jumlah Harga Tenaga Kerja 92,500.00
Bahan
1.1.7.01.01.05.002.00019 Kayu Kruing, Balok. Uk. 6 x 12 x 400 0.028 m3 7,546,700 211,307.60
cm
1.1.7.01.01.01.022.00073 Gypsum Board Tebal, 9 mm, Uk. 120 0.860 Lembar 81,300 69,918.00
x 240
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.150 Kg 19,550 2,932.50
1.1.7.01.01.01.022.00271 Lem Kayu 0.560 Kg 23,250 13,020.00
Jumlah Harga Bahan 297,178.10
Peralatan
Jumlah Harga Peralatan
Jumlah 389,678.10
Overhead & Profit 15 % 58,451.72

Nilai HSPK : 448,130.00


2.01.01.07 G. PEKERJAAN FINSHING
2.01.01.07.01 Penutup Atap Dan langit - Langit

2.01.01.07.01.001 1 m2 Pekerjaan Pasang Atap m2 Nilai HSPK 114,931.00


Genteng Karang Pilang Ex. Nglayur (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.008 O.H 130,000 1,040.00
1.10.28.02.01.001.002 Kepala Tukang 0.008 O.H 120,000 900.00
1.10.28.02.01.001.004 Tukang Kayu 0.075 O.H 110,000 8,250.00
1.10.28.02.01.002.001 Pekerja 0.150 O.H 90,000 13,500.00
Jumlah Harga Tenaga Kerja 23,690.00
Bahan
1.1.7.01.01.01.014.00015 Genteng Karang Pilang Kw-I, Ex 25.000 Buah 3,050 76,250.00
Nglayur
Jumlah Harga Bahan 76,250.00
Peralatan
Jumlah Harga Peralatan

74
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Jumlah 99,940.00
Overhead & Profit 15 % 14,991.00

Nilai HSPK : 114,931.00


2.01.01.07.01.002 1 m2 Pekerjaan Pasang Atap m2 Nilai HSPK 163,806.00
Genteng Karang Pilang Ex. Wisma (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.008 O.H 130,000 1,040.00
1.10.28.02.01.001.002 Kepala Tukang 0.008 O.H 120,000 900.00
1.10.28.02.01.001.004 Tukang Kayu 0.075 O.H 110,000 8,250.00
1.10.28.02.01.002.001 Pekerja 0.150 O.H 90,000 13,500.00
Jumlah Harga Tenaga Kerja 23,690.00
Bahan
1.1.7.01.01.01.014.00016 Genteng Karang Pilang Good Year, 25.000 Buah 4,750 118,750.00
KW-I ,ex Wisma, Bisma
Jumlah Harga Bahan 118,750.00
Peralatan
Jumlah Harga Peralatan
Jumlah 142,440.00
Overhead & Profit 15 % 21,366.00

Nilai HSPK : 163,806.00


2.01.01.07.01.003 1 m2 Pekerjaan Pasang Atap m2 Nilai HSPK 115,000.00
Genteng Kodok Ex. Trenggalek (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.008 O.H 130,000 1,040.00
1.10.28.02.01.001.002 Kepala Tukang 0.008 O.H 120,000 960.00
1.10.28.02.01.001.004 Tukang Kayu 0.075 O.H 110,000 8,250.00
1.10.28.02.01.002.001 Pekerja 0.150 O.H 90,000 13,500.00
Jumlah Harga Tenaga Kerja 23,750.00
Bahan
1.1.7.01.01.01.014.00020 Genteng Kodok Trenggalek 25.000 Buah 3,050 76,250.00
Jumlah Harga Bahan 76,250.00
Peralatan
Jumlah Harga Peralatan
Jumlah 100,000.00
Overhead & Profit 15 % 15,000.00

Nilai HSPK : 115,000.00


2.01.01.07.01.004 1 m2 Pekerjaan Pasang Atap m2 Nilai HSPK 122,188.00
Genteng Kodok Ex. Nglayur (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.008 O.H 130,000 1,040.00
1.10.28.02.01.001.002 Kepala Tukang 0.008 O.H 120,000 960.00
1.10.28.02.01.001.004 Tukang Kayu 0.075 O.H 110,000 8,250.00
1.10.28.02.01.002.001 Pekerja 0.150 O.H 90,000 13,500.00
Jumlah Harga Tenaga Kerja 23,750.00
Bahan
1.1.7.01.01.01.014.00022 Genteng Kodok Nglayur 25.000 Buah 3,300 82,500.00
Jumlah Harga Bahan 82,500.00
Peralatan
Jumlah Harga Peralatan
Jumlah 106,250.00
Overhead & Profit 15 % 15,937.50

Nilai HSPK : 122,188.00


2.01.01.07.01.005 1 m2 Pekerjaan Pasang Atap m2 Nilai HSPK 258,952.00
Genteng Keramik Glazzur (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.080 O.H 130,000 10,400.00
1.10.28.02.01.001.002 Kepala Tukang 0.080 O.H 120,000 9,600.00
1.10.28.02.01.001.004 Tukang Kayu 0.075 O.H 110,000 8,250.00

75
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
1.10.28.02.01.002.001 Pekerja 0.150 O.H 90,000 13,500.00
Jumlah Harga Tenaga Kerja 41,750.00
Bahan
1.1.7.01.01.01.014.00023 Genteng Glazur Kamuri 14.500 Buah 12,650 183,425.00
Jumlah Harga Bahan 183,425.00
Peralatan
Jumlah Harga Peralatan
Jumlah 225,175.00
Overhead & Profit 15 % 33,776.25

Nilai HSPK : 258,952.00


2.01.01.07.01.006 1 m2 Pekerjaan Pasang Atap m2 Nilai HSPK 116,595.00
Genteng Beton (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.010 O.H 130,000 1,300.00
1.10.28.02.01.001.002 Kepala Tukang 0.010 O.H 120,000 1,200.00
1.10.28.02.01.001.004 Tukang Kayu 0.100 O.H 110,000 11,000.00
1.10.28.02.01.002.001 Pekerja 0.200 O.H 90,000 18,000.00
Jumlah Harga Tenaga Kerja 31,500.00
Bahan
1.1.7.01.01.01.014.00017 Genteng Beton Garuda 11.000 Buah 6,300 69,300.00
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.030 Kg 19,550 586.50
Jumlah Harga Bahan 69,886.50
Peralatan
Jumlah Harga Peralatan
Jumlah 101,386.50
Overhead & Profit 15 % 15,207.98

Nilai HSPK : 116,595.00


2.01.01.07.01.007 1 m2 Pekerjaan Pasang Atap m2 Nilai HSPK 185,122.00
Genteng Metal (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.001 O.H 130,000 130.00
1.10.28.02.01.001.002 Kepala Tukang 0.010 O.H 120,000 1,200.00
1.10.28.02.01.001.004 Tukang Kayu 0.100 O.H 110,000 11,000.00
1.10.28.02.01.002.001 Pekerja 0.200 O.H 90,000 18,000.00
Jumlah Harga Tenaga Kerja 30,330.00
Bahan
1.1.7.01.01.01.014.00024 Genteng Metal/Galvalume 1.020 Lembar 124,250 126,735.00
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.200 Kg 19,550 3,910.00
Jumlah Harga Bahan 130,645.00
Peralatan
Jumlah Harga Peralatan
Jumlah 160,975.00
Overhead & Profit 15 % 24,146.25

Nilai HSPK : 185,122.00


2.01.01.07.01.008 1 m2 Pasang Atap Sirap Kayu m2 Nilai HSPK 685,849.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.008 O.H 130,000 1,040.00
1.10.28.02.01.001.002 Kepala Tukang 0.025 O.H 120,000 3,000.00
1.10.28.02.01.001.004 Tukang Kayu 0.250 O.H 110,000 27,500.00
1.10.28.02.01.002.001 Pekerja 0.166 O.H 90,000 14,940.00
Jumlah Harga Tenaga Kerja 46,480.00
Bahan
1.1.7.01.01.01.014.00029 Atap Sirap 30.00 Lembar 18,200 546,000.00
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.200 Kg 19,550 3,910.00
Jumlah Harga Bahan 549,910.00
Peralatan
Jumlah Harga Peralatan
Jumlah 596,390.00
Overhead & Profit 15 % 89,458.50

76
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Nilai HSPK : 685,849.00
2.01.01.07.01.009 1 m2 Pasang Atap Seng Gelombang m2 Nilai HSPK 88,115.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.006 O.H 130,000 780.00
1.10.28.02.01.001.002 Kepala Tukang 0.006 O.H 120,000 720.00
1.10.28.02.01.001.004 Tukang Kayu 0.060 O.H 110,000 6,600.00
1.10.28.02.01.002.001 Pekerja 0.120 O.H 90,000 10,800.00
Jumlah Harga Tenaga Kerja 18,900.00
Bahan
1.1.7.01.01.01.007.00004 Seng Gelombang BJLS 30 Uk. 80 cm x 0.700 Lembar 81,900 57,330.00
240 cm
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.020 Kg 19,550 391.00
Jumlah Harga Bahan 57,721.00
Peralatan
Jumlah Harga Peralatan
Jumlah 76,621.00
Overhead & Profit 15 % 11,493.15

Nilai HSPK : 88,115.00


2.01.01.07.01.010 1 m2 Pekerjaan Pasang Atap Roof m2 Nilai HSPK 69,469.00
Light Fiber Glass (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.007 O.H 130,000 910.00
1.10.28.02.01.001.002 Kepala Tukang 0.007 O.H 120,000 840.00
1.10.28.02.01.001.004 Tukang Kayu 0.067 O.H 110,000 7,370.00
1.10.28.02.01.002.001 Pekerja 0.140 O.H 90,000 12,600.00
Jumlah Harga Tenaga Kerja 21,720.00
Bahan
1.1.7.01.01.01.022.00085 Roof Light Fibergalass 0.600 Lembar 62,850 37,710.00
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.050 Kg 19,550 977.50
Jumlah Harga Bahan 38,687.50
Peralatan
Jumlah Harga Peralatan
Jumlah 60,407.50
Overhead & Profit 15 % 9,061.13

Nilai HSPK : 69,469.00


2.01.01.07.01.011 1 m2 Pekerjaan Pasang Atap Asbes m2 Nilai HSPK 95,059.00
Gelombang Tebal 5 Mm (2,5 X 0,92) (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.008 O.H 130,000 1,040.00
1.10.28.02.01.001.002 Kepala Tukang 0.008 O.H 120,000 960.00
1.10.28.02.01.001.004 Tukang Kayu 0.075 O.H 110,000 8,250.00
1.10.28.02.01.002.001 Pekerja 0.140 O.H 90,000 12,600.00
Jumlah Harga Tenaga Kerja 22,850.00
Bahan
1.1.7.01.01.01.022.00014 Asbes Gelombang Kecil 0.500 Lembar 113,200 56,600.00
1.1.7.01.01.01.022.00097 Paku Pancing 0.120 Kg 26,750 3,210.00
Jumlah Harga Bahan 59,810.00
Peralatan
Jumlah Harga Peralatan
Jumlah 82,660.00
Overhead & Profit 15 % 12,399.00

Nilai HSPK : 95,059.00


2.01.01.07.01.012 1 m2 Pekerjaan Pasang Atap Asbes m2 Nilai HSPK 95,565.00
Gelombang Tebal 5 Mm (2 X 0,92) (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.007 O.H 130,000 910.00
1.10.28.02.01.001.002 Kepala Tukang 0.007 O.H 120,000 840.00
1.10.28.02.01.001.004 Tukang Kayu 0.070 O.H 110,000 7,700.00

77
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
1.10.28.02.01.002.001 Pekerja 0.140 O.H 90,000 12,600.00
Jumlah Harga Tenaga Kerja 22,050.00
Bahan
1.1.7.01.01.01.022.00013 Asbes Gelombang Kecil 0.600 Lembar 96,400 57,840.00
1.1.7.01.01.01.022.00097 Paku Pancing 0.120 Kg 26,750 3,210.00
Jumlah Harga Bahan 61,050.00
Peralatan
Jumlah Harga Peralatan
Jumlah 83,100.00
Overhead & Profit 15 % 12,465.00

Nilai HSPK : 95,565.00


2.01.01.07.01.013 1 m2 Pekerjaan Pasang Atap Asbes m2 Nilai HSPK 100,766.00
Gelombang Tebal 5 Mm (1,8 X 0,92) (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.007 O.H 130,000 910.00
1.10.28.02.01.001.002 Kepala Tukang 0.007 O.H 120,000 840.00
1.10.28.02.01.001.004 Tukang Kayu 0.070 O.H 110,000 7,700.00
1.10.28.02.01.002.001 Pekerja 0.140 O.H 90,000 12,600.00
Jumlah Harga Tenaga Kerja 22,050.00
Bahan
1.1.7.01.01.01.022.00012 Asbes Gelombang Kecil 0.750 Lembar 83,150 62,362.50
1.1.7.01.01.01.022.00097 Paku Pancing 0.120 Kg 26,750 3,210.00
Jumlah Harga Bahan 65,572.50
Peralatan
Jumlah Harga Peralatan
Jumlah 87,622.50
Overhead & Profit 15 % 13,143.38

Nilai HSPK : 100,766.00


2.01.01.07.01.014 1 m2 Pekerjaan Pasang Atap Asbes m2 Nilai HSPK 73,224.00
Gelombang Tebal 4 Mm (3 X 1,05) (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.007 O.H 130,000 910.00
1.10.28.02.01.001.002 Kepala Tukang 0.007 O.H 120,000 840.00
1.10.28.02.01.001.004 Tukang Kayu 0.070 O.H 110,000 7,700.00
1.10.28.02.01.002.001 Pekerja 0.140 O.H 90,000 12,600.00
Jumlah Harga Tenaga Kerja 22,050.00
Bahan
1.1.7.01.01.01.022.00011 Asbes Gelombang Kecil 0.350 Lembar 109,750 38,412.50
1.1.7.01.01.01.022.00097 Paku Pancing 0.120 Kg 26,750 3,210.00
Jumlah Harga Bahan 41,622.50
Peralatan
Jumlah Harga Peralatan
Jumlah 63,672.50
Overhead & Profit 15 % 9,550.88

Nilai HSPK : 73,224.00


2.01.01.07.01.015 1 m2 Pekerjaan Pasang Atap Asbes m2 Nilai HSPK 78,968.00
Gelombang Tebal 4 Mm (2,7 X 1,05) (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.007 O.H 130,000 910.00
1.10.28.02.01.001.002 Kepala Tukang 0.007 O.H 120,000 840.00
1.10.28.02.01.001.004 Tukang Kayu 0.070 O.H 110,000 7,700.00
1.10.28.02.01.002.001 Pekerja 0.140 O.H 90,000 12,600.00
Jumlah Harga Tenaga Kerja 22,050.00
Bahan
1.1.7.01.01.01.022.00010 Asbes Gelombang Kecil 0.420 Lembar 103,350 43,407.00
1.1.7.01.01.01.022.00097 Paku Pancing 0.120 Kg 26,750 3,210.00
Jumlah Harga Bahan 46,617.00
Peralatan

78
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Jumlah Harga Peralatan
Jumlah 68,667.00
Overhead & Profit 15 % 10,300.05

Nilai HSPK : 78,968.00


2.01.01.07.01.016 1 m2 Pekerjaan Pasang Atap Asbes m2 Nilai HSPK 72,743.00
Gelombang Tebal 4 Mm (2,4 X 1,05) (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.007 O.H 130,000 910.00
1.10.28.02.01.001.002 Kepala Tukang 0.007 O.H 120,000 840.00
1.10.28.02.01.001.004 Tukang Kayu 0.067 O.H 110,000 7,370.00
1.10.28.02.01.002.001 Pekerja 0.140 O.H 90,000 12,600.00
Jumlah Harga Tenaga Kerja 21,720.00
Bahan
1.1.7.01.01.01.022.00009 Asbes Gelombang Kecil 0.440 Lembar 87,100 38,324.00
1.1.7.01.01.01.022.00097 Paku Pancing 0.120 Kg 26,750 3,210.00
Jumlah Harga Bahan 41,534.00
Peralatan
Jumlah Harga Peralatan
Jumlah 63,254.00
Overhead & Profit 15 % 9,488.10

Nilai HSPK : 72,743.00


2.01.01.07.01.017 1 m2 Pekerjaan Pasang Atap Asbes m2 Nilai HSPK 72,951.00
Gelombang Tebal 4 Mm (2,1 X 1,05) (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.007 O.H 130,000 910.00
1.10.28.02.01.001.002 Kepala Tukang 0.007 O.H 120,000 840.00
1.10.28.02.01.001.004 Tukang Kayu 0.067 O.H 110,000 7,370.00
1.10.28.02.01.002.001 Pekerja 0.140 O.H 90,000 12,600.00
Jumlah Harga Tenaga Kerja 21,720.00
Bahan
1.1.7.01.01.01.022.00008 Asbes Gelombang Kecil 0.510 Lembar 75,500 38,505.00
1.1.7.01.01.01.022.00097 Paku Pancing 0.120 Kg 26,750 3,210.00
Jumlah Harga Bahan 41,715.00
Peralatan
Jumlah Harga Peralatan
Jumlah 63,435.00
Overhead & Profit 15 % 9,515.25

Nilai HSPK : 72,951.00


2.01.01.07.01.018 1 m2 Pekerjaan Pasang Atap Asbes m2 Nilai HSPK 82,122.00
Gelombang Tebal 4 Mm (1,5 X 1,05) (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.007 O.H 130,000 910.00
1.10.28.02.01.001.002 Kepala Tukang 0.007 O.H 120,000 840.00
1.10.28.02.01.001.004 Tukang Kayu 0.067 O.H 110,000 7,370.00
1.10.28.02.01.002.001 Pekerja 0.140 O.H 90,000 12,600.00
Jumlah Harga Tenaga Kerja 21,720.00
Bahan
1.1.7.01.01.01.022.00006 Asbes Gelombang Kecil 0.800 Lembar 58,100 46,480.00
1.1.7.01.01.01.022.00097 Paku Pancing 0.120 Kg 26,750 3,210.00
Jumlah Harga Bahan 49,690.00
Peralatan
Jumlah Harga Peralatan
Jumlah 71,410.00
Overhead & Profit 15 % 10,711.50

Nilai HSPK : 82,122.00


2.01.01.07.01.019 1 m' Pekerjaan Pasang Wuwung m' Nilai HSPK 186,060.00
Genteng Palentong (dibulatkan) :

79
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.002 O.H 130,000 260.00
1.10.28.02.01.001.002 Kepala Tukang 0.020 O.H 120,000 2,400.00
1.10.28.02.01.001.004 Tukang Kayu 0.200 O.H 110,000 22,000.00
1.10.28.02.01.002.001 Pekerja 0.400 O.H 90,000 36,000.00
Jumlah Harga Tenaga Kerja 60,660.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 8.000 Kg 1,306 10,449.25
1.1.7.01.01.01.004.00002 Pasir Pasang 0.032 m3 232,250 7,432.00
1.1.7.01.01.01.014.00002 Genteng Wuwung Plentong 5.000 Buah 16,650 83,250.00
Jumlah Harga Bahan 101,131.25
Peralatan
Jumlah Harga Peralatan
Jumlah 161,791.25
Overhead & Profit 15 % 24,268.69

Nilai HSPK : 186,060.00


2.01.01.07.01.020 1 m' Pekerjaan Pasang Wuwung m' Nilai HSPK 186,060.00
Genteng Kodok (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.002 O.H 130,000 260.00
1.10.28.02.01.001.002 Kepala Tukang 0.020 O.H 120,000 2,400.00
1.10.28.02.01.001.004 Tukang Kayu 0.200 O.H 110,000 22,000.00
1.10.28.02.01.002.001 Pekerja 0.400 O.H 90,000 36,000.00
Jumlah Harga Tenaga Kerja 60,660.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 8.000 Kg 1,306 10,449.25
1.1.7.01.01.01.004.00002 Pasir Pasang 0.032 m3 232,250 7,432.00
1.1.7.01.01.01.014.00002 Genteng Wuwung Plentong 5.000 Buah 16,650 83,250.00
Jumlah Harga Bahan 101,131.25
Peralatan
Jumlah Harga Peralatan
Jumlah 161,791.25
Overhead & Profit 15 % 24,268.69

Nilai HSPK : 186,060.00


2.01.01.07.01.021 1 m' Pekerjaan Pasang Wuwung m' Nilai HSPK 137,185.00
Genteng Karang Pilang Ex. Nglayur (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.002 O.H 130,000 260.00
1.10.28.02.01.001.002 Kepala Tukang 0.020 O.H 120,000 2,400.00
1.10.28.02.01.001.004 Tukang Kayu 0.200 O.H 110,000 22,000.00
1.10.28.02.01.002.001 Pekerja 0.400 O.H 90,000 36,000.00
Jumlah Harga Tenaga Kerja 60,660.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 8.000 Kg 1,306 10,449.25
1.1.7.01.01.01.004.00002 Pasir Pasang 0.032 m3 232,250 7,432.00
1.1.7.01.01.01.014.00003 Genteng Wuwung Karang Pilang 5.000 Buah 8,150 40,750.00
Ngalyur Ex Trenggalek
Jumlah Harga Bahan 58,631.25
Peralatan
Jumlah Harga Peralatan
Jumlah 119,291.25
Overhead & Profit 15 % 17,893.69

Nilai HSPK : 137,185.00


2.01.01.07.01.022 1 m' Pekerjaan Pasang Bubungan m' Nilai HSPK 257,360.00
Genteng Keramik/ Glazzur (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.002 O.H 130,000 260.00
1.10.28.02.01.001.002 Kepala Tukang 0.020 O.H 120,000 2,400.00
1.10.28.02.01.001.004 Tukang Kayu 0.200 O.H 110,000 22,000.00

80
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
1.10.28.02.01.002.001 Pekerja 0.400 O.H 90,000 36,000.00
Jumlah Harga Tenaga Kerja 60,660.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 8.000 Kg 1,306 10,449.25
1.1.7.01.01.01.004.00002 Pasir Pasang 0.032 m3 232,250 7,432.00
1.1.7.01.01.01.014.00028 Wuwung Genteng Keramik Glazzur 5.000 Buah 29,050 145,250.00

Jumlah Harga Bahan 163,131.25


Peralatan
Jumlah Harga Peralatan
Jumlah 223,791.25
Overhead & Profit 15 % 33,568.69

Nilai HSPK : 257,360.00


2.01.01.07.01.023 1 m' Pekerjaan Pasang Nok Genteng m' Nilai HSPK 153,026.00
Beton (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.020 O.H 130,000 2,600.00
1.10.28.02.01.001.002 Kepala Tukang 0.020 O.H 120,000 2,400.00
1.10.28.02.01.001.004 Tukang Kayu 0.200 O.H 110,000 22,000.00
1.10.28.02.01.002.001 Pekerja 0.400 O.H 90,000 36,000.00
Jumlah Harga Tenaga Kerja 63,000.00
Bahan
1.1.7.01.01.01.014.00004 Genteng Wuwung Beton 3.500 Buah 8,600 30,100.00
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.050 Kg 19,550 977.50
1.1.7.01.01.01.002.00001 Semen Portland 10.800 Kg 1,306 14,106.49
1.1.7.01.01.01.004.00002 Pasir Pasang 0.032 m3 232,250 7,432.00
1.1.7.01.01.01.002.00008 Semen Warna Yiyitan 1.000 Kg 17,450 17,450.00
Jumlah Harga Bahan 70,065.99
Peralatan
Jumlah Harga Peralatan
Jumlah 133,065.99
Overhead & Profit 15 % 19,959.90

Nilai HSPK : 153,026.00


2.01.01.07.01.024 1 m' Pemasangan Nok Genteng m' Nilai HSPK 101,410.00
Metal (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.013 O.H 130,000 1,690.00
1.10.28.02.01.001.002 Kepala Tukang 0.015 O.H 120,000 1,800.00
1.10.28.02.01.001.004 Tukang Kayu 0.150 O.H 110,000 16,500.00
1.10.28.02.01.002.001 Pekerja 0.250 O.H 90,000 22,500.00
Jumlah Harga Tenaga Kerja 42,490.00
Bahan
1.1.7.01.01.01.014.00030 Nok Genteng Metal 1.100 Buah 40,650 44,715.00
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.050 Kg 19,550 977.50
Jumlah Harga Bahan 45,692.50
Peralatan
Jumlah Harga Peralatan
Jumlah 88,182.50
Overhead & Profit 15 % 13,227.38

Nilai HSPK : 101,410.00


2.01.01.07.01.025 1 m' Pasang Nok Sirap m2 Nilai HSPK 95,502.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.006 O.H 130,000 780.00
1.10.28.02.01.001.002 Kepala Tukang 0.025 O.H 120,000 3,000.00
1.10.28.02.01.001.004 Tukang Kayu 0.250 O.H 110,000 27,500.00
1.10.28.02.01.002.001 Pekerja 0.125 O.H 90,000 11,250.00
Jumlah Harga Tenaga Kerja 42,530.00
Bahan
1.1.7.01.01.01.007.00016 Seng Plat BJLS 28 Uk. 3inch. x 6inch. 0.400 Lembar 96,400 38,560.00

81
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.100 Kg 19,550 1,955.00
Jumlah Harga Bahan 40,515.00
Peralatan
Jumlah Harga Peralatan
Jumlah 83,045.00
Overhead & Profit 15 % 12,456.75

Nilai HSPK : 95,502.00


2.01.01.07.01.026 1 m' Pasang Nok Atap Seng m2 Nilai HSPK 60,401.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.006 O.H 130,000 780.00
1.10.28.02.01.001.002 Kepala Tukang 0.007 O.H 120,000 840.00
1.10.28.02.01.001.004 Tukang Kayu 0.070 O.H 110,000 7,700.00
1.10.28.02.01.002.001 Pekerja 0.150 O.H 90,000 13,500.00
Jumlah Harga Tenaga Kerja 22,820.00
Bahan
1.1.7.01.01.01.007.00016 Seng Plat BJLS 28 Uk. 3inch. x 6inch. 0.300 Lembar 96,400 28,920.00

1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.040 Kg 19,550 782.00


Jumlah Harga Bahan 29,702.00
Peralatan
Jumlah Harga Peralatan
Jumlah 52,522.00
Overhead & Profit 15 % 7,878.30

Nilai HSPK : 60,401.00


2.01.01.07.01.027 1 m' Pekerjaan Pasang Nok Stel Rata m' Nilai HSPK 84,544.00
0.92 M (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.004 O.H 130,000 520.00
1.10.28.02.01.001.002 Kepala Tukang 0.013 O.H 120,000 1,560.00
1.10.28.02.01.001.004 Tukang Kayu 0.150 O.H 110,000 16,500.00
1.10.28.02.01.002.001 Pekerja 0.100 O.H 90,000 9,000.00
Jumlah Harga Tenaga Kerja 27,580.00
Bahan
1.1.7.01.01.01.014.00031 Nok Stel Seng 92 Cm 1.100 Lembar 40,650 44,715.00
1.1.7.01.01.01.022.00101 Paku Sekrup 0.060 Dus 20,350 1,221.00
Jumlah Harga Bahan 45,936.00
Peralatan
Jumlah Harga Peralatan
Jumlah 73,516.00
Overhead & Profit 15 % 11,027.40

Nilai HSPK : 84,544.00


2.01.01.07.01.028 1 m' Pekerjaan Pasang Nok Stel Rata m' Nilai HSPK 79,725.00
1.05 M (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.004 O.H 130,000 520.00
1.10.28.02.01.001.002 Kepala Tukang 0.013 O.H 120,000 1,560.00
1.10.28.02.01.001.004 Tukang Kayu 0.125 O.H 110,000 13,750.00
1.10.28.02.01.002.001 Pekerja 0.084 O.H 90,000 7,560.00
Jumlah Harga Tenaga Kerja 23,390.00
Bahan
1.1.7.01.01.01.014.00031 Nok Stel Seng 105 Cm 1.100 Lembar 40,650 44,715.00
1.1.7.01.01.01.022.00101 Paku Sekrup 0.060 Dus 20,350 1,221.00
Jumlah Harga Bahan 45,936.00
Peralatan
Jumlah Harga Peralatan
Jumlah 69,326.00
Overhead & Profit 15 % 10,398.90

Nilai HSPK : 79,725.00

82
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
2.01.01.07.01.029 1 m' Pekerjaan Pemasangan m' Nilai HSPK 143,243.00
Wuwung Stel Gelombang Kecil 0.92 (dibulatkan) :
M
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.004 O.H 130,000 520.00
1.10.28.02.01.001.002 Kepala Tukang 0.013 O.H 120,000 1,560.00
1.10.28.02.01.001.004 Tukang Kayu 0.125 O.H 110,000 13,750.00
1.10.28.02.01.002.001 Pekerja 0.084 O.H 90,000 7,560.00
Jumlah Harga Tenaga Kerja 23,390.00
Bahan
1.1.7.01.01.01.022.00029 Asbes Wuwung Stel Gelombang 0,92 2.400 Lembar 41,950 100,680.00
mm
1.1.7.01.01.01.022.00101 Paku Sekrup 0.024 Dus 20,350 488.40
Jumlah Harga Bahan 101,168.40
Peralatan
Jumlah Harga Peralatan
Jumlah 124,558.40
Overhead & Profit 15 % 18,683.76

Nilai HSPK : 143,243.00


2.01.01.07.01.030 1 m' Pekerjaan Pemasangan m' Nilai HSPK 158,112.00
Wuwung Stel Gelombang Kecil 1.05 (dibulatkan) :
M
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.004 O.H 130,000 520.00
1.10.28.02.01.001.002 Kepala Tukang 0.013 O.H 120,000 1,560.00
1.10.28.02.01.001.004 Tukang Kayu 0.125 O.H 110,000 13,750.00
1.10.28.02.01.002.001 Pekerja 0.084 O.H 90,000 7,560.00
Jumlah Harga Tenaga Kerja 23,390.00
Bahan
1.1.7.01.01.01.022.00030 Asbes Wuwung Stel Gelombang 1,05 2.100 Lembar 54,100 113,610.00
mm
1.1.7.01.01.01.022.00101 Paku Sekrup 0.024 Dus 20,350 488.40
Jumlah Harga Bahan 114,098.40
Peralatan
Jumlah Harga Peralatan
Jumlah 137,488.40
Overhead & Profit 15 % 20,623.26

Nilai HSPK : 158,112.00


2.01.01.07.01.031 1 m' Pekerjaan Pemasangan m' Nilai HSPK 169,854.00
Wuwung Stel Gelombang Kecil 1.08 (dibulatkan) :
M
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.004 O.H 130,000 520.00
1.10.28.02.01.001.002 Kepala Tukang 0.013 O.H 120,000 1,560.00
1.10.28.02.01.001.004 Tukang Kayu 0.125 O.H 110,000 13,750.00
1.10.28.02.01.002.001 Pekerja 0.084 O.H 90,000 7,560.00
Jumlah Harga Tenaga Kerja 23,390.00
Bahan
1.1.7.01.01.01.022.00031 Asbes Wuwung Stel Gelombang 1,08 2.050 Lembar 60,400 123,820.00
mm
1.1.7.01.01.01.022.00101 Paku Sekrup 0.024 Dus 20,350 488.40
Jumlah Harga Bahan 124,308.40
Peralatan
Jumlah Harga Peralatan
Jumlah 147,698.40
Overhead & Profit 15 % 22,154.76

Nilai HSPK : 169,854.00


2.01.01.07.01.032 1 M2 Pekerjaan Water Proofing m2 Nilai HSPK 230,784.00
Membran (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.200 O.H 90,000 18,000.00

83
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
1.10.28.02.01.001.006 Tukang Batu 0.600 O.H 110,000 66,000.00
Jumlah Harga Tenaga Kerja 84,000.00
Bahan
1.1.7.01.01.01.022.00203 Water Proofing Membrane 1.100 m2 37,100 40,810.00
2.01.01.04.02.003 1 m2 Pekerjaan Plesteran 1 Pc : 3 Ps 1.000 m2 72,161.00 72,161.00
Tebal 15 Mm
1.1.7.01.01.01.022.00203 Pengetesan (10 % Material) 0.100 Set 37,100 3,710.00
Jumlah Harga Bahan 116,681.00
Peralatan
Jumlah Harga Peralatan
Jumlah 200,681.00
Overhead & Profit 15 % 30,102.15

Nilai HSPK : 230,784.00


2.01.01.07.01.033 1 M2 Pekerjaan Water Proofing m2 Nilai HSPK 166,060.00
Coating (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.200 O.H 90,000 18,000.00
1.10.28.02.01.001.006 Tukang Batu 0.600 O.H 110,000 66,000.00
Jumlah Harga Tenaga Kerja 84,000.00
Bahan
1.1.7.01.01.01.022.00198 Water Proofing Coating 1.000 Kg 57,150 57,150.00
1.1.7.01.01.01.022.00250 Kuas Cat 3 inch. 0.250 bh 13,000 3,250.00
Jumlah Harga Bahan 60,400.00
Peralatan
Jumlah Harga Peralatan
Jumlah 144,400.00
Overhead & Profit 15 % 21,660.00

Nilai HSPK : 166,060.00


2.01.01.07.01.034 1 m2 Pekerjaan Langit - Langit Asbes m2 Nilai HSPK 61,436.00
Tebal 4 Mm (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.004 O.H 130,000 520.00
1.10.28.02.01.001.002 Kepala Tukang 0.007 O.H 120,000 840.00
1.10.28.02.01.001.004 Tukang Kayu 0.070 O.H 110,000 7,700.00
1.10.28.02.01.002.001 Pekerja 0.030 O.H 90,000 2,700.00
Jumlah Harga Tenaga Kerja 11,760.00
Bahan
1.1.7.01.01.01.022.00035 Asbes Semen Tebal 4 mm 1.100 m2 37,400 41,140.00
1.1.7.01.01.01.022.00088 Paku Asbes 0.010 Kg 52,250 522.50
Jumlah Harga Bahan 41,662.50
Peralatan
Jumlah Harga Peralatan
Jumlah 53,422.50
Overhead & Profit 15 % 8,013.38

Nilai HSPK : 61,436.00


2.01.01.07.01.035 1 m2 Pekerjaan Langit - Langit Asbes m2 Nilai HSPK 64,978.00
Tebal 5 Mm (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.004 O.H 130,000 520.00
1.10.28.02.01.001.002 Kepala Tukang 0.007 O.H 120,000 840.00
1.10.28.02.01.001.004 Tukang Kayu 0.070 O.H 110,000 7,700.00
1.10.28.02.01.002.001 Pekerja 0.030 O.H 90,000 2,700.00
Jumlah Harga Tenaga Kerja 11,760.00
Bahan
1.1.7.01.01.01.022.00036 Asbes Semen Tebal 6 mm 1.100 m2 40,200 44,220.00
1.1.7.01.01.01.022.00088 Paku Asbes 0.010 Kg 52,250 522.50
Jumlah Harga Bahan 44,742.50
Peralatan
Jumlah Harga Peralatan
Jumlah 56,502.50
Overhead & Profit 15 % 8,475.38

84
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f

Nilai HSPK : 64,978.00


2.01.01.07.01.036 1 m2 Pekerjaan Langit - Langit Asbes m2 Nilai HSPK 64,978.00
Tebal 6 Mm (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.004 O.H 130,000 520.00
1.10.28.02.01.001.002 Kepala Tukang 0.007 O.H 120,000 840.00
1.10.28.02.01.001.004 Tukang Kayu 0.070 O.H 110,000 7,700.00
1.10.28.02.01.002.001 Pekerja 0.030 O.H 90,000 2,700.00
Jumlah Harga Tenaga Kerja 11,760.00
Bahan
1.1.7.01.01.01.022.00036 Asbes Semen Tebal 6 mm 1.100 m2 40,200 44,220.00
1.1.7.01.01.01.022.00088 Paku Asbes 0.010 Kg 52,250 522.50
Jumlah Harga Bahan 44,742.50
Peralatan
Jumlah Harga Peralatan
Jumlah 56,502.50
Overhead & Profit 15 % 8,475.38

Nilai HSPK : 64,978.00


2.01.01.07.01.037 1 m2 Pekerjaan Langit - Langit m2 Nilai HSPK 55,988.00
Tripleks Uk. 120X240,Tbl 3 Mm (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.005 O.H 130,000 650.00
1.10.28.02.01.001.002 Kepala Tukang 0.010 O.H 120,000 1,200.00
1.10.28.02.01.001.004 Tukang Kayu 0.100 O.H 110,000 11,000.00
1.10.28.02.01.002.001 Pekerja 0.100 O.H 90,000 9,000.00
Jumlah Harga Tenaga Kerja 21,850.00
Bahan
1.1.7.01.01.05.007.00006 Triplek Uk. 122 cm x 244 cm x 3 mm 0.375 Lembar 69,700 26,137.50

1.1.7.01.01.01.022.00102 Paku Triplek 0.030 Kg 23,250 697.50


Jumlah Harga Bahan 26,835.00
Peralatan
Jumlah Harga Peralatan
Jumlah 48,685.00
Overhead & Profit 15 % 7,302.75

Nilai HSPK : 55,988.00


2.01.01.07.01.038 1 m2 Pekerjaan Langit - Langit m2 Nilai HSPK 63,492.00
Tripleks Uk. 120X240,Tbl 4 Mm (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.005 O.H 130,000 650.00
1.10.28.02.01.001.002 Kepala Tukang 0.010 O.H 120,000 1,200.00
1.10.28.02.01.001.004 Tukang Kayu 0.100 O.H 110,000 11,000.00
1.10.28.02.01.002.001 Pekerja 0.100 O.H 90,000 9,000.00
Jumlah Harga Tenaga Kerja 21,850.00
Bahan
1.1.7.01.01.05.007.00007 Triplek Uk. 122 cm x 244 cm x 4 mm 0.375 Lembar 87,100 32,662.50

1.1.7.01.01.01.022.00102 Paku Triplek 0.030 Kg 23,250 697.50


Jumlah Harga Bahan 33,360.00
Peralatan
Jumlah Harga Peralatan
Jumlah 55,210.00
Overhead & Profit 15 % 8,281.50

Nilai HSPK : 63,492.00


2.01.01.07.01.039 1 m2 Pekerjaan Langit - Langit m2 Nilai HSPK 68,494.00
Tripleks Uk. 120X240, Tbl 6 Mm (dibulatkan) :

Tenaga Kerja

85
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
1.10.28.02.01.001.001 Mandor 0.005 O.H 130,000 650.00
1.10.28.02.01.001.002 Kepala Tukang 0.010 O.H 120,000 1,200.00
1.10.28.02.01.001.004 Tukang Kayu 0.100 O.H 110,000 11,000.00
1.10.28.02.01.002.001 Pekerja 0.100 O.H 90,000 9,000.00
Jumlah Harga Tenaga Kerja 21,850.00
Bahan
1.1.7.01.01.05.007.00008 Triplek Uk. 122 cm x 244 cm x 6 mm 0.375 Lembar 98,700 37,012.50

1.1.7.01.01.01.022.00102 Paku Triplek 0.030 Kg 23,250 697.50


Jumlah Harga Bahan 37,710.00
Peralatan
Jumlah Harga Peralatan
Jumlah 59,560.00
Overhead & Profit 15 % 8,934.00

Nilai HSPK : 68,494.00


2.01.01.07.01.040 1 m2 Pekerjaan Langit - Langit m2 Nilai HSPK 542,642.00
Lambrizing Kayu, Tebal 9 Mm (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.040 O.H 130,000 5,200.00
1.10.28.02.01.001.002 Kepala Tukang 0.080 O.H 120,000 9,600.00
1.10.28.02.01.001.004 Tukang Kayu 0.800 O.H 110,000 88,000.00
1.10.28.02.01.002.001 Pekerja 0.800 O.H 90,000 72,000.00
Jumlah Harga Tenaga Kerja 174,800.00
Bahan
1.1.7.01.01.05.002.00002 Kayu Jati, Papan, Uk. 2 x 20 x 400 cm 0.015 m3 19,788,650 296,829.75

1.1.7.01.01.01.022.00102 Paku Triplek 0.010 Kg 23,250 232.50


Jumlah Harga Bahan 297,062.25
Peralatan
Jumlah Harga Peralatan
Jumlah 471,862.25
Overhead & Profit 15 % 70,779.34

Nilai HSPK : 542,642.00


2.01.01.07.01.041 1 m2 Pekerjaan Langit - Langit m2 Nilai HSPK 55,188.00
Gypsum Board, (120X240) Tebal 9 (dibulatkan) :
Mm
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.005 O.H 130,000 650.00
1.10.28.02.01.001.002 Kepala Tukang 0.005 O.H 120,000 600.00
1.10.28.02.01.001.004 Tukang Kayu 0.050 O.H 110,000 5,500.00
1.10.28.02.01.002.001 Pekerja 0.100 O.H 90,000 9,000.00
Jumlah Harga Tenaga Kerja 15,750.00
Bahan
1.1.7.01.01.01.022.00073 Gypsum Board Tebal, 9 mm, Uk. 120 0.364 Lembar 81,300 29,593.20
x 240
1.1.7.01.01.01.022.00135 Sekrup Mata Tutup RRT, Uk. 1 0.110 Kg 24,050 2,645.50
Jumlah Harga Bahan 32,238.70
Peralatan
Jumlah Harga Peralatan
Jumlah 47,988.70
Overhead & Profit 15 % 7,198.31

Nilai HSPK : 55,188.00


2.01.01.07.01.042 1 m' Pekerjaan List Langit - Langit m' Nilai HSPK 25,603.00
Kayu Profil (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.003 O.H 130,000 390.00
1.10.28.02.01.001.002 Kepala Tukang 0.005 O.H 120,000 600.00
1.10.28.02.01.001.004 Tukang Kayu 0.050 O.H 110,000 5,500.00
1.10.28.02.01.002.001 Pekerja 0.050 O.H 90,000 4,500.00
Jumlah Harga Tenaga Kerja 10,990.00

86
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Bahan
1.1.7.01.01.05.002.00046 Kayu List Plafon Profil, 2 m 1.050 Lonjor 10,550 11,077.50
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.010 Kg 19,550 195.50
Jumlah Harga Bahan 11,273.00
Peralatan
Jumlah Harga Peralatan
Jumlah 22,263.00
Overhead & Profit 15 % 3,339.45

Nilai HSPK : 25,603.00


2.01.01.07.01.043 1 m' Pekerjaan List Langit - Langit m' Nilai HSPK 46,895.00
Gypsum (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.003 O.H 130,000 390.00
1.10.28.02.01.001.002 Kepala Tukang 0.006 O.H 120,000 720.00
1.10.28.02.01.001.004 Tukang Kayu 0.060 O.H 110,000 6,600.00
1.10.28.02.01.002.001 Pekerja 0.060 O.H 90,000 5,400.00
Jumlah Harga Tenaga Kerja 13,110.00
Bahan
1.1.7.01.01.01.022.00074 List Gypsum Profil 5 cm 1.050 m' 25,250 26,512.50
1.1.7.01.01.01.022.00083 Tepung Gypsum 0.150 Kg 7,700 1,155.00
Jumlah Harga Bahan 27,667.50
Peralatan
Jumlah Harga Peralatan
Jumlah 40,777.50
Overhead & Profit 15 % 6,116.63

Nilai HSPK : 46,895.00


2.01.01.07.02 Sanitair
2.01.01.07.02.001 Pekerjaan Pemasangan 1 Buah Buah Nilai HSPK 2,556,945.00
Kloset Duduk (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.160 O.H 130,000 20,800.00
1.10.28.02.01.001.002 Kepala Tukang 0.001 O.H 120,000 120.00
1.10.28.02.01.001.006 Tukang Batu 1.100 O.H 110,000 121,000.00
1.10.28.02.01.002.001 Pekerja 3.300 O.H 90,000 297,000.00
Jumlah Harga Tenaga Kerja 438,920.00
Bahan
1.1.7.01.01.01.022.00147 Closet Duduk Ina, Komplit 1.000 Buah 1,683,500 1,683,500.00
1.1.7.01.01.01.022.00147 Peralatan (6% Dari Harga Bahan) 0.060 Set 1,683,500 101,010.00
Jumlah Harga Bahan 1,784,510.00
Peralatan
Jumlah Harga Peralatan
Jumlah 2,223,430.00
Overhead & Profit 15 % 333,514.50

Nilai HSPK : 2,556,945.00


2.01.01.07.02.002 Pekerjaan Pemasangan 1 Buah Buah Nilai HSPK 569,031.00
Kloset Jongkok Porselen (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.160 O.H 130,000 20,800.00
1.10.28.02.01.001.002 Kepala Tukang 0.150 O.H 120,000 18,000.00
1.10.28.02.01.001.006 Tukang Batu 1.500 O.H 110,000 165,000.00
1.10.28.02.01.002.001 Pekerja 1.000 O.H 90,000 90,000.00
Jumlah Harga Tenaga Kerja 293,800.00
Bahan
1.1.7.01.01.01.022.00156 Closet Jongkok Porselin Warna Putih 1.000 Buah 190,850 190,850.00

1.1.7.01.01.01.002.00001 Semen Portland 6.000 Kg 1,306 7,836.94


1.1.7.01.01.01.004.00002 Pasir Pasang 0.010 m3 232,250 2,322.50
Jumlah Harga Bahan 201,009.44
Peralatan
Jumlah Harga Peralatan

87
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Jumlah 494,809.44
Overhead & Profit 15 % 74,221.42

Nilai HSPK : 569,031.00


2.01.01.07.02.003 Pekerjaan Pemasangan 1 Buah Buah Nilai HSPK 500,371.00
Kloset Jongkok Teraso (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.050 O.H 130,000 6,500.00
1.10.28.02.01.001.002 Kepala Tukang 0.150 O.H 120,000 18,000.00
1.10.28.02.01.001.006 Tukang Batu 1.500 O.H 110,000 165,000.00
1.10.28.02.01.002.001 Pekerja 1.000 O.H 90,000 90,000.00
Jumlah Harga Tenaga Kerja 279,500.00
Bahan
1.1.7.01.01.01.022.00157 Closet Jongkok Teraso 1.000 Buah 139,350 139,350.00
1.1.7.01.01.01.005.00010 Batu Bata Merah, Kelas 1 7.000 Buah 871 6,095.40
1.1.7.01.01.01.002.00001 Semen Portland 6.000 Kg 1,306 7,836.94
1.1.7.01.01.01.004.00002 Pasir Pasang 0.010 m3 232,250 2,322.50
Jumlah Harga Bahan 155,604.84
Peralatan
Jumlah Harga Peralatan
Jumlah 435,104.84
Overhead & Profit 15 % 65,265.73

Nilai HSPK : 500,371.00


2.01.01.07.02.004 Pekerjaan Pemasangan 1 Buah Buah Nilai HSPK 2,866,576.00
Urinoir (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.050 O.H 130,000 6,500.00
1.10.28.02.01.001.002 Kepala Tukang 0.100 O.H 120,000 12,000.00
1.10.28.02.01.001.006 Tukang Batu 1.000 O.H 110,000 110,000.00
1.10.28.02.01.002.001 Pekerja 1.000 O.H 90,000 90,000.00
Jumlah Harga Tenaga Kerja 218,500.00
Bahan
1.1.7.01.01.01.022.00159 Urinoir 1.000 set 1,741,550 1,741,550.00
1.1.7.01.01.01.002.00001 Semen Portland 6.000 Kg 1,306 7,836.94
1.1.7.01.01.01.004.00002 Pasir Pasang 0.010 m3 232,250 2,322.50
1.1.7.01.01.01.022.00159 Peralatan (30% Dari Harga Bahan) 0.300 set 1,741,550 522,465.00

Jumlah Harga Bahan 2,274,174.44


Peralatan
Jumlah Harga Peralatan
Jumlah 2,492,674.44
Overhead & Profit 15 % 373,901.17

Nilai HSPK : 2,866,576.00


2.01.01.07.02.005 Pekerjaan Pemasangan 1 Buah Buah Nilai HSPK 1,127,126.00
Wastafel (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.060 O.H 130,000 7,800.00
1.10.28.02.01.001.002 Kepala Tukang 0.150 O.H 120,000 18,000.00
1.10.28.02.01.001.009 Tukang Pipa 1.450 O.H 110,000 159,500.00
1.10.28.02.01.002.001 Pekerja 1.200 O.H 90,000 108,000.00
Jumlah Harga Tenaga Kerja 293,300.00
Bahan
1.1.7.01.01.01.022.00174 Wastafel Ina, Bahan Keramik 1.200 set 540,650 648,780.00
1.1.7.01.01.01.002.00001 Semen Portland 6.000 Kg 1,306 7,836.94
1.1.7.01.01.01.004.00002 Pasir Pasang 0.010 m3 232,250 2,322.50
1.1.7.01.01.01.004.00002 Peralatan (12% Dari Harga Bahan) 0.120 set 232,250 27,870.00

Jumlah Harga Bahan 686,809.44


Peralatan
Jumlah Harga Peralatan
Jumlah 980,109.44
Overhead & Profit 15 % 147,016.42

88
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f

Nilai HSPK : 1,127,126.00


2.01.01.07.02.006 Pekerjaan Pemasangan 1 Buah Bak Buah Nilai HSPK 1,544,644.00
Mandi Fiberglass (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.900 O.H 130,000 117,000.00
1.10.28.02.01.001.002 Kepala Tukang 0.050 O.H 120,000 6,000.00
1.10.28.02.01.001.006 Tukang Batu 4.500 O.H 110,000 495,000.00
1.10.28.02.01.002.001 Pekerja 3.000 O.H 90,000 270,000.00
Jumlah Harga Tenaga Kerja 888,000.00
Bahan
1.1.7.01.01.01.022.00191 Bak Mandi Fiber Glass 1.000 buah 406,400 406,400.00
1.1.7.01.01.01.022.00191 Peralatan (12% Dari Harga Bahan) 0.120 set 406,400 48,768.00

Jumlah Harga Bahan 455,168.00


Peralatan
Jumlah Harga Peralatan
Jumlah 1,343,168.00
Overhead & Profit 15 % 201,475.20

Nilai HSPK : 1,544,644.00


2.01.01.07.02.007 Pekerjaan Pemasangan 1 Buah Bak Buah Nilai HSPK 1,353,734.00
Mandi Teraso (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.900 O.H 130,000 117,000.00
1.10.28.02.01.001.002 Kepala Tukang 0.050 O.H 120,000 6,000.00
1.10.28.02.01.001.006 Tukang Batu 4.500 O.H 110,000 495,000.00
1.10.28.02.01.002.001 Pekerja 3.000 O.H 90,000 270,000.00
Jumlah Harga Tenaga Kerja 888,000.00
Bahan
1.1.7.01.01.01.022.00192 Bak Teraso 1.000 buah 279,000 279,000.00
1.1.7.01.01.01.002.00001 Semen Portland 6.000 Kg 1,306 7,836.94
1.1.7.01.01.01.004.00002 Pasir Pasang 0.010 m3 232,250 2,322.50
Jumlah Harga Bahan 289,159.44
Peralatan
Jumlah Harga Peralatan
Jumlah 1,177,159.44
Overhead & Profit 15 % 176,573.92

Nilai HSPK : 1,353,734.00


2.01.01.07.02.008 Pekerjaan Pemasangan 1 Buah Bak Buah Nilai HSPK 2,900,104.00
Mandi Batu Bata Merah, Kelas 1 (dibulatkan) :
Volume 0.3 m3

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.030 O.H 130,000 3,900.00
1.10.28.02.01.001.002 Kepala Tukang 0.300 O.H 120,000 36,000.00
1.10.28.02.01.001.006 Tukang Batu 3.000 O.H 110,000 330,000.00
1.10.28.02.01.002.001 Pekerja 6.000 O.H 90,000 540,000.00
Jumlah Harga Tenaga Kerja 909,900.00
Bahan
1.1.7.01.01.01.005.00010 Batu Bata Merah, Kelas 1 150.000 Buah 871 130,615.65
1.1.7.01.01.01.002.00001 Semen Portland 120.000 Kg 1,306 156,738.78
1.1.7.01.01.01.004.00002 Pasir Pasang 0.300 m3 232,250 69,675.00
1.1.7.01.01.01.013.00018 Keramik Dinding Motif, Uk. 20 x 25 18.000 M2 63,900 1,150,200.00

1.1.7.01.01.01.002.00007 Semen Warna/Nat 6.000 Kg 17,450 104,700.00


Jumlah Harga Bahan 1,611,929.43
Peralatan
Jumlah Harga Peralatan
Jumlah 2,521,829.43
Overhead & Profit 15 % 378,274.41

Nilai HSPK : 2,900,104.00

89
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
2.01.01.07.02.009 Pekerjaan Pemasangan 1 Buah Bak Buah Nilai HSPK 522,560.00
Cuci Piring Stainless Steel Dan (dibulatkan) :
Accessories

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.015 O.H 130,000 1,950.00
1.10.28.02.01.001.002 Kepala Tukang 0.030 O.H 120,000 3,600.00
1.10.28.02.01.001.006 Tukang Batu 0.300 O.H 110,000 33,000.00
1.10.28.02.01.002.001 Pekerja 0.030 O.H 90,000 2,700.00
Jumlah Harga Tenaga Kerja 41,250.00
Bahan
1.1.7.01.01.01.022.00190 Bak Cuci Stainless Steel 1.000 Buah 395,650 395,650.00
1.1.7.01.01.01.022.00194 Water Drain + Accessories 1.000 set 17,500 17,500.00
Jumlah Harga Bahan 413,150.00
Peralatan
Jumlah Harga Peralatan
Jumlah 454,400.00
Overhead & Profit 15 % 68,160.00

Nilai HSPK : 522,560.00


2.01.01.07.02.010 Pekerjaan Pemasangan 1 Buah Floor Buah Nilai HSPK 35,938.00
Drain (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.005 O.H 130,000 650.00
1.10.28.02.01.001.002 Kepala Tukang 0.010 O.H 120,000 1,200.00
1.10.28.02.01.001.006 Tukang Batu 0.100 O.H 110,000 11,000.00
1.10.28.02.01.002.001 Pekerja 0.010 O.H 90,000 900.00
Jumlah Harga Tenaga Kerja 13,750.00
Bahan
1.1.7.01.01.01.022.00195 Floor Drain + Accessories 1.000 buah 17,500 17,500.00
Jumlah Harga Bahan 17,500.00
Peralatan
Jumlah Harga Peralatan
Jumlah 31,250.00
Overhead & Profit 15 % 4,687.50

Nilai HSPK : 35,938.00


2.01.01.07.02.011 Pekerjaan Pemasangan 1 Buah Bak Buah Nilai HSPK 510,791.00
Kontrol Pasangan Batu Bata Merah, (dibulatkan) :
Kelas 1 Uk 30 X 30 Cm, Tinggi 35 Cm

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.011 O.H 130,000 1,430.00
1.10.28.02.01.001.002 Kepala Tukang 0.072 O.H 120,000 8,640.00
1.10.28.02.01.001.006 Tukang Batu 0.720 O.H 110,000 79,200.00
1.10.28.02.01.002.001 Pekerja 2.160 O.H 90,000 194,400.00
Jumlah Harga Tenaga Kerja 283,670.00
Bahan
1.1.7.01.01.01.005.00010 Batu Bata Merah, Kelas 1 40.000 Buah 871 34,830.84
1.1.7.01.01.01.002.00001 Semen Portland 44.000 Kg 1,306 57,470.89
1.1.7.01.01.01.004.00002 Pasir Pasang 0.070 m3 232,250 16,257.50
1.1.7.01.01.01.005.00009 Batu Kerikil Beton 0.070 m3 290,300 20,321.00
1.1.7.01.01.01.012.00006 Besi Beton Polos 1.600 Kg 11,050 17,680.00
1.1.7.01.01.01.004.00001 Pasir Beton 0.060 m3 232,250 13,935.00
Jumlah Harga Bahan 160,495.23
Peralatan
Jumlah Harga Peralatan
Jumlah 444,165.23
Overhead & Profit 15 % 66,624.78

Nilai HSPK : 510,791.00

90
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
2.01.01.07.02.012 Pekerjaan Pemasangan 1 Buah Bak Buah Nilai HSPK 764,818.00
Kontrol Pasangan Batu Bata Merah, (dibulatkan) :
Kelas 1 Uk. 45 X 45 Cm, Tinggi 50 Cm

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.016 O.H 130,000 2,080.00
1.10.28.02.01.001.002 Kepala Tukang 0.011 O.H 120,000 1,320.00
1.10.28.02.01.001.006 Tukang Batu 1.150 O.H 110,000 126,500.00
1.10.28.02.01.002.001 Pekerja 3.200 O.H 90,000 288,000.00
Jumlah Harga Tenaga Kerja 417,900.00
Bahan
1.1.7.01.01.01.005.00010 Batu Bata Merah, Kelas 1 70.000 Buah 871 60,953.97
1.1.7.01.01.01.002.00001 Semen Portland 77.000 Kg 1,306 100,574.05
1.1.7.01.01.01.004.00002 Pasir Pasang 0.130 m3 232,250 30,192.50
1.1.7.01.01.01.005.00009 Batu Kerikil Beton 0.020 m3 290,300 5,806.00
1.1.7.01.01.01.012.00006 Besi Beton Polos 2.600 Kg 11,050 28,730.00
1.1.7.01.01.01.004.00001 Pasir Beton 0.090 m3 232,250 20,902.50
Jumlah Harga Bahan 247,159.02
Peralatan
Jumlah Harga Peralatan
Jumlah 665,059.02
Overhead & Profit 15 % 99,758.85

Nilai HSPK : 764,818.00


2.01.01.07.02.013 Pekerjaan Pemasangan 1 Buah Bak Buah Nilai HSPK 928,836.00
Kontrol Pasangan Batu Bata Merah, (dibulatkan) :
Kelas 1 Uk. 60 X 60 Cm, Tinggi 65 Cm

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.016 O.H 130,000 2,080.00
1.10.28.02.01.001.002 Kepala Tukang 0.011 O.H 120,000 1,320.00
1.10.28.02.01.001.006 Tukang Batu 1.150 O.H 110,000 126,500.00
1.10.28.02.01.002.001 Pekerja 3.200 O.H 90,000 288,000.00
Jumlah Harga Tenaga Kerja 417,900.00
Bahan
1.1.7.01.01.01.005.00010 Batu Bata Merah, Kelas 1 123.000 Buah 871 107,104.83
1.1.7.01.01.01.002.00001 Semen Portland 114.000 Kg 1,306 148,901.84
1.1.7.01.01.01.004.00002 Pasir Pasang 0.184 m3 232,250 42,734.00
1.1.7.01.01.01.005.00009 Batu Kerikil Beton 0.033 m3 290,300 9,579.90
1.1.7.01.01.01.012.00006 Besi Beton Polos 4.850 Kg 11,050 53,592.50
1.1.7.01.01.01.004.00001 Pasir Beton 0.120 m3 232,250 27,870.00
Jumlah Harga Bahan 389,783.07
Peralatan
Jumlah Harga Peralatan
Jumlah 807,683.07
Overhead & Profit 15 % 121,152.46

Nilai HSPK : 928,836.00


2.01.01.07.02.014 1 m' Pekerjaan Pasang Pipa Galvanis m' Nilai HSPK 540,161.00
Diameter 1/2inch. (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.027 O.H 130,000 3,510.00
1.10.28.02.01.001.002 Kepala Tukang 0.009 O.H 120,000 1,080.00
1.10.28.02.01.001.009 Tukang Pipa 0.090 O.H 110,000 9,900.00
1.10.28.02.01.002.001 Pekerja 0.054 O.H 90,000 4,860.00
Jumlah Harga Tenaga Kerja 19,350.00
Bahan
1.1.7.02.02.07.001.00001 Pipa Galvanis Dia, 1/2inch. @6m 1.200 Batang 156,400 187,680.00
Medium A
9.1.2.09.03.01.001.00093 Perlengkapan 0.350 Set 750,500.00 262,675.00
Jumlah Harga Bahan 450,355.00
Peralatan

91
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Jumlah Harga Peralatan
Jumlah 469,705.00
Overhead & Profit 15 % 70,455.75

Nilai HSPK : 540,161.00


2.01.01.07.02.015 1 m' Pekerjaan Pasang Pipa Galvanis m' Nilai HSPK 601,571.00
Diameter 3/4inch. (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.027 O.H 130,000 3,510.00
1.10.28.02.01.001.002 Kepala Tukang 0.009 O.H 120,000 1,080.00
1.10.28.02.01.001.009 Tukang Pipa 0.090 O.H 110,000 9,900.00
1.10.28.02.01.002.001 Pekerja 0.054 O.H 90,000 4,860.00
Jumlah Harga Tenaga Kerja 19,350.00
Bahan
1.1.7.02.02.07.001.00002 Pipa Galvanis Dia, 3/4inch. @6m 1.200 Batang 200,900 241,080.00
Medium A
9.1.2.09.03.01.001.00093 Perlengkapan 0.350 Set 750,500.00 262,675.00
Jumlah Harga Bahan 503,755.00
Peralatan
Jumlah Harga Peralatan
Jumlah 523,105.00
Overhead & Profit 15 % 78,465.75

Nilai HSPK : 601,571.00


2.01.01.07.02.016 1 m' Pekerjaan Pasang Pipa Galvanis m' Nilai HSPK 740,951.00
Diameter 1inch. (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.027 O.H 130,000 3,510.00
1.10.28.02.01.001.002 Kepala Tukang 0.009 O.H 120,000 1,080.00
1.10.28.02.01.001.009 Tukang Pipa 0.090 O.H 110,000 9,900.00
1.10.28.02.01.002.001 Pekerja 0.054 O.H 90,000 4,860.00
Jumlah Harga Tenaga Kerja 19,350.00
Bahan
1.1.7.02.02.07.001.00003 Pipa Galvanis Dia, 1inch. @6m 1.200 Batang 301,900 362,280.00
Medium A
9.1.2.09.03.01.001.00093 Perlengkapan 0.350 Set 750,500.00 262,675.00
Jumlah Harga Bahan 624,955.00
Peralatan
Jumlah Harga Peralatan
Jumlah 644,305.00
Overhead & Profit 15 % 96,645.75

Nilai HSPK : 740,951.00


2.01.01.07.02.017 1 m' Pekerjaan Pasang Pipa Galvanis m' Nilai HSPK 877,286.00
Diameter 1 1/2inch. (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.005 O.H 130,000 702.00
1.10.28.02.01.001.002 Kepala Tukang 0.018 O.H 120,000 2,160.00
1.10.28.02.01.001.009 Tukang Pipa 0.180 O.H 110,000 19,800.00
1.10.28.02.01.002.001 Pekerja 0.108 O.H 90,000 9,720.00
Jumlah Harga Tenaga Kerja 32,382.00
Bahan
1.1.7.02.02.07.001.00005 Pipa Galvanis Dia, 1-1/2inch. @6m 1.200 Batang 467,800 467,800.00
Medium A
9.1.2.09.03.01.001.00093 Perlengkapan 0.350 Set 750,500.00 262,675.00
Jumlah Harga Bahan 730,475.00
Peralatan
Jumlah Harga Peralatan
Jumlah 762,857.00
Overhead & Profit 15 % 114,428.55

Nilai HSPK : 877,286.00

92
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
2.01.01.07.02.018 1 m' Pekerjaan Pasang Pipa Galvanis m' Nilai HSPK 1,800,354.00
Diameter 3inch. (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.007 O.H 130,000 910.00
1.10.28.02.01.001.002 Kepala Tukang 0.023 O.H 120,000 2,760.00
1.10.28.02.01.001.009 Tukang Pipa 0.225 O.H 110,000 24,750.00
1.10.28.02.01.002.001 Pekerja 0.135 O.H 90,000 12,150.00
Jumlah Harga Tenaga Kerja 40,570.00
Bahan
1.1.7.02.02.07.001.00008 Pipa Galvanis Dia, 3inch. @6m 1.200 Batang 1,051,900 1,262,280.00
Medium A
9.1.2.09.03.01.001.00093 Perlengkapan 0.350 Set 750,500.00 262,675.00
Jumlah Harga Bahan 1,524,955.00
Peralatan
Jumlah Harga Peralatan
Jumlah 1,565,525.00
Overhead & Profit 15 % 234,828.75

Nilai HSPK : 1,800,354.00


2.01.01.07.02.019 1 m' Pekerjaan Pasang Pipa Galvanis m' Nilai HSPK 2,450,304.00
Diameter 4inch. (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.007 O.H 130,000 884.00
1.10.28.02.01.001.002 Kepala Tukang 0.023 O.H 120,000 2,700.00
1.10.28.02.01.001.009 Tukang Pipa 0.225 O.H 110,000 24,750.00
1.10.28.02.01.002.001 Pekerja 0.135 O.H 90,000 12,150.00
Jumlah Harga Tenaga Kerja 40,484.00
Bahan
1.1.7.02.02.07.001.00009 Pipa Galvanis Dia, 4inch. @6m 1.200 Batang 1,522,950 1,827,540.00
Medium A
9.1.2.09.03.01.001.00093 Perlengkapan 0.350 Set 750,500.00 262,675.00
Jumlah Harga Bahan 2,090,215.00
Peralatan
Jumlah Harga Peralatan
Jumlah 2,130,699.00
Overhead & Profit 15 % 319,604.85

Nilai HSPK : 2,450,304.00


2.01.01.07.02.020 Pekerjaan Pemasangan 1 Buah Kran Buah Nilai HSPK 82,056.00
Air dia. 3/4inch. Atau 1/2inch. (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.005 O.H 130,000 650.00
1.10.28.02.01.001.002 Kepala Tukang 0.040 O.H 120,000 4,800.00
1.10.28.02.01.001.009 Tukang Pipa 0.400 O.H 110,000 44,000.00
1.10.28.02.01.002.001 Pekerja 0.010 O.H 90,000 900.00
Jumlah Harga Tenaga Kerja 50,350.00
Bahan
1.1.7.01.01.01.022.00345 Kran Air inch.Omco, Uk. 1/2inch. 1.000 Buah 20,900 20,900.00
1.1.7.01.01.01.022.00471 Seal Tape Pipa 0.025 roll 4,100 102.50
Jumlah Harga Bahan 21,002.50
Peralatan
Jumlah Harga Peralatan
Jumlah 71,352.50
Overhead & Profit 15 % 10,702.88

Nilai HSPK : 82,056.00


2.01.01.07.02.021 1 m' Pekerjaan Pasang Pipa Pvc Type m' Nilai HSPK 101,271.00
Aw dia. 1/2inch. (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.002 O.H 130,000 234.00
1.10.28.02.01.001.002 Kepala Tukang 0.006 O.H 120,000 720.00
1.10.28.02.01.001.009 Tukang Pipa 0.060 O.H 110,000 6,600.00
1.10.28.02.01.002.001 Pekerja 0.036 O.H 90,000 3,240.00

93
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Jumlah Harga Tenaga Kerja 10,794.00
Bahan
1.1.7.02.02.06.001.00017 Pipa PVC Maspion, AW 1/2inch. x 6 1.200 Batang 49,850 59,820.00
m
1.1.7.02.02.06.001.00017 Perlengkapan 0.350 Set 49,850 17,447.50
Jumlah Harga Bahan 77,267.50
Peralatan
Jumlah Harga Peralatan
Jumlah 88,061.50
Overhead & Profit 15 % 13,209.23

Nilai HSPK : 101,271.00


2.01.01.07.02.022 1 m' Pekerjaan Pasang Pipa Pvc Type m' Nilai HSPK 120,700.00
Aw dia. 3/4inch. (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.002 O.H 130,000 234.00
1.10.28.02.01.001.002 Kepala Tukang 0.006 O.H 120,000 720.00
1.10.28.02.01.001.009 Tukang Pipa 0.060 O.H 110,000 6,600.00
1.10.28.02.01.002.001 Pekerja 0.036 O.H 90,000 3,240.00
Jumlah Harga Tenaga Kerja 10,794.00
Bahan
1.1.7.02.02.06.001.00018 Pipa PVC Maspion, AW 3/4inch. x 6 1.200 Batang 60,750 72,900.00
m
1.1.7.02.02.06.001.00018 Perlengkapan 0.350 Set 60,750 21,262.50
Jumlah Harga Bahan 94,162.50
Peralatan
Jumlah Harga Peralatan
Jumlah 104,956.50
Overhead & Profit 15 % 15,743.48

Nilai HSPK : 120,700.00


2.01.01.07.02.023 1 m' Pekerjaan Pasang Pipa Pvc Type m' Nilai HSPK 148,775.00
Aw dia. 1inch. (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.002 O.H 130,000 234.00
1.10.28.02.01.001.002 Kepala Tukang 0.006 O.H 120,000 720.00
1.10.28.02.01.001.009 Tukang Pipa 0.060 O.H 110,000 6,600.00
1.10.28.02.01.002.001 Pekerja 0.036 O.H 90,000 3,240.00
Jumlah Harga Tenaga Kerja 10,794.00
Bahan
1.1.7.02.02.06.001.00019 Pipa PVC Maspion, AW 1inch. x 6 m 1.200 Batang 76,500 91,800.00

1.1.7.02.02.06.001.00019 Perlengkapan 0.350 Set 76,500 26,775.00


Jumlah Harga Bahan 118,575.00
Peralatan
Jumlah Harga Peralatan
Jumlah 129,369.00
Overhead & Profit 15 % 19,405.35

Nilai HSPK : 148,775.00


2.01.01.07.02.024 1 m' Pekerjaan Pasang Pipa Pvc Type m' Nilai HSPK 269,997.00
Aw dia. 1 1/2inch. (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.003 O.H 130,000 390.00
1.10.28.02.01.001.002 Kepala Tukang 0.009 O.H 120,000 1,080.00
1.10.28.02.01.001.009 Tukang Pipa 0.090 O.H 110,000 9,900.00
1.10.28.02.01.002.001 Pekerja 0.054 O.H 90,000 4,860.00
Jumlah Harga Tenaga Kerja 16,230.00
Bahan
1.1.7.02.02.06.001.00021 Pipa PVC Maspion, AW 1 1/2inch. x 1.200 Batang 141,000 169,200.00
6m
1.1.7.02.02.06.001.00021 Perlengkapan 0.350 Set 141,000 49,350.00
Jumlah Harga Bahan 218,550.00
Peralatan

94
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Jumlah Harga Peralatan
Jumlah 234,780.00
Overhead & Profit 15 % 35,217.00

Nilai HSPK : 269,997.00


2.01.01.07.02.025 1 m' Pekerjaan Pasang Pipa Pvc Type m' Nilai HSPK 391,787.00
Aw dia. 2inch. (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.003 O.H 130,000 351.00
1.10.28.02.01.001.002 Kepala Tukang 0.009 O.H 120,000 1,080.00
1.10.28.02.01.001.009 Tukang Pipa 0.090 O.H 110,000 9,900.00
1.10.28.02.01.002.001 Pekerja 0.054 O.H 90,000 4,860.00
Jumlah Harga Tenaga Kerja 16,191.00
Bahan
1.1.7.02.02.06.001.00022 Pipa PVC Maspion, AW 2inch. x 6 m 1.200 Batang 209,350 251,220.00

1.1.7.02.02.06.001.00022 Perlengkapan 0.350 Set 209,350 73,272.50


Jumlah Harga Bahan 324,492.50
Peralatan
Jumlah Harga Peralatan
Jumlah 340,683.50
Overhead & Profit 15 % 51,102.53

Nilai HSPK : 391,787.00


2.01.01.07.02.026 1 m' Pekerjaan Pasang Pipa Pvc Type m' Nilai HSPK 507,148.00
Aw dia. 2 1/2inch. (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.004 O.H 130,000 520.00
1.10.28.02.01.001.002 Kepala Tukang 0.014 O.H 120,000 1,620.00
1.10.28.02.01.001.009 Tukang Pipa 0.135 O.H 110,000 14,850.00
1.10.28.02.01.002.001 Pekerja 0.081 O.H 90,000 7,290.00
Jumlah Harga Tenaga Kerja 24,280.00
Bahan
1.1.7.02.02.06.001.00023 Pipa PVC Maspion, AW 2 1/2inch. x 1.200 Batang 268,850 322,620.00
6m
1.1.7.02.02.06.001.00023 Perlengkapan 0.350 Set 268,850 94,097.50
Jumlah Harga Bahan 416,717.50
Peralatan
Jumlah Harga Peralatan
Jumlah 440,997.50
Overhead & Profit 15 % 66,149.63

Nilai HSPK : 507,148.00


2.01.01.07.02.027 1 m' Pekerjaan Pasang Pipa Pvc Type m' Nilai HSPK 711,259.00
Aw dia. 3inch. (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.004 O.H 130,000 533.00
1.10.28.02.01.001.002 Kepala Tukang 0.0135 O.H 120,000 1,620.00
1.10.28.02.01.001.009 Tukang Pipa 0.135 O.H 110,000 14,850.00
1.10.28.02.01.002.001 Pekerja 0.081 O.H 90,000 7,290.00
Jumlah Harga Tenaga Kerja 24,293.00
Bahan
1.1.7.02.02.06.001.00024 Pipa PVC Maspion, AW 3inch. x 6 m 1.200 Batang 383,350 460,020.00

1.1.7.02.02.06.001.00024 Perlengkapan 0.350 Set 383,350 134,172.50


Jumlah Harga Bahan 594,192.50
Peralatan
Jumlah Harga Peralatan
Jumlah 618,485.50
Overhead & Profit 15 % 92,772.83

Nilai HSPK : 711,259.00


2.01.01.07.02.028 1 m' Pekerjaan Pasang Pipa Pvc Type m' Nilai HSPK 1,024,088.00
Aw dia. 4inch. (dibulatkan) :

95
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.004 O.H 130,000 533.00
1.10.28.02.01.001.002 Kepala Tukang 0.0135 O.H 120,000 1,620.00
1.10.28.02.01.001.009 Tukang Pipa 0.135 O.H 110,000 14,850.00
1.10.28.02.01.002.001 Pekerja 0.081 O.H 90,000 7,290.00
Jumlah Harga Tenaga Kerja 24,293.00
Bahan
1.1.7.02.02.06.001.00025 Pipa PVC Maspion, AW 4inch. x 6 m 1.200 Batang 558,850 670,620.00

1.1.7.02.02.06.001.00025 Perlengkapan 0.350 Set 558,850 195,597.50


Jumlah Harga Bahan 866,217.50
Peralatan
Jumlah Harga Peralatan
Jumlah 890,510.50
Overhead & Profit 15 % 133,576.58

Nilai HSPK : 1,024,088.00


2.01.01.07.02.029 1 m' Pekerjaan Pasang Pipa Pvc m' Nilai HSPK 38,426.00
Class D Dia. 2inch. (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.003 O.H 130,000 351.00
1.10.28.02.01.001.002 Kepala Tukang 0.009 O.H 120,000 1,080.00
1.10.28.02.01.001.009 Tukang Pipa 0.090 O.H 110,000 9,900.00
1.10.28.02.01.002.001 Pekerja 0.054 O.H 90,000 4,860.00
Jumlah Harga Tenaga Kerja 16,191.00
Bahan
1.1.7.02.02.06.001.00040 Pipa PVC Maspion, D 2inch. x 4 m 0.200 Batang 66,650 13,330.00

1.1.7.02.02.06.001.00040 Perlengkapan 0.058 Set 66,650 3,892.36


Jumlah Harga Bahan 17,222.36
Peralatan
Jumlah Harga Peralatan
Jumlah 33,413.36
Overhead & Profit 15 % 5,012.00

Nilai HSPK : 38,426.00


2.01.01.07.02.030 1 m' Pekerjaan Pasang Pipa Pvc m' Nilai HSPK 70,491.00
Class D Dia. 3inch. (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.004 O.H 130,000 533.00
1.10.28.02.01.001.002 Kepala Tukang 0.014 O.H 120,000 1,620.00
1.10.28.02.01.001.009 Tukang Pipa 0.135 O.H 110,000 14,850.00
1.10.28.02.01.002.001 Pekerja 0.081 O.H 90,000 7,290.00
Jumlah Harga Tenaga Kerja 24,293.00
Bahan
1.1.7.02.02.06.001.00042 Pipa PVC Maspion, D 3inch. x 4 m 0.200 Batang 143,200 28,640.00

1.1.7.02.02.06.001.00042 Perlengkapan 0.058 Set 143,200 8,362.88


Jumlah Harga Bahan 37,002.88
Peralatan
Jumlah Harga Peralatan
Jumlah 61,295.88
Overhead & Profit 15 % 9,194.38

Nilai HSPK : 70,491.00


2.01.01.07.02.031 1 m' Pekerjaan Pasang Pipa Pvc m' Nilai HSPK 87,771.00
Class D Dia. 4inch. (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.004 O.H 130,000 533.00
1.10.28.02.01.001.002 Kepala Tukang 0.014 O.H 120,000 1,620.00
1.10.28.02.01.001.009 Tukang Pipa 0.135 O.H 110,000 14,850.00
1.10.28.02.01.002.001 Pekerja 0.081 O.H 90,000 7,290.00
Jumlah Harga Tenaga Kerja 24,293.00
Bahan

96
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
1.1.7.02.02.06.001.00043 Pipa PVC Maspion, D 4inch. x 4 m 0.200 Batang 201,350 40,270.00

1.1.7.02.02.06.001.00043 Perlengkapan 0.058 Set 201,350 11,758.84


Jumlah Harga Bahan 52,028.84
Peralatan
Jumlah Harga Peralatan
Jumlah 76,321.84
Overhead & Profit 15 % 11,448.28

Nilai HSPK : 87,771.00


2.01.01.07.02.032 Pas. Shower set Unit Nilai HSPK 508,970.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.016 O.H 130,000 2,080.00
1.10.28.02.01.001.002 Kepala Tukang 0.110 O.H 120,000 13,200.00
1.10.28.02.01.001.009 Tukang Pipa 1.100 O.H 110,000 121,000.00
Jumlah Harga Tenaga Kerja 136,280.00
Bahan
1.1.7.01.01.01.022.00164 Shower Set 1.000 Unit 306,200 306,200.00
1.1.7.01.01.01.022.00471 Seal tape 0.025 Unit 4,100 102.50
Jumlah Harga Bahan 306,302.50
Peralatan
Jumlah Harga Peralatan
Jumlah 442,582.50
Overhead & Profit 15 % 66,387.38

Nilai HSPK : 508,970.00


2.01.01.07.02.033 Septictank Pas. Bata kap. 3,00 m3 + Unit Nilai HSPK 8,480,501.00
Rembesan (dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
2.01.01.01.02.001 Galian tanah, dalam s/d 1 m 3.000 m3 81,363.00 244,089.00
2.01.01.01.02.019 Pas. Urugan pasir 0.300 m3 256,864.00 77,059.20
2.01.01.03.01.001 Pas. Lantai kerja beton tumbuk 1:3:5 3.000 m2 965,573.00 2,896,719.00

2.01.01.04.01.002 Pas. Dinding batu bata; ad 1:2 10.500 m2 156,037.00 1,638,388.50


2.01.01.04.02.002 Pas. Plester acian; ad. 1:2 12.000 m2 75,037.00 900,444.00
2.01.01.03.01.006 Beton K - 200 0.360 m3 1,327,090.00 477,752.40
1.1.7.02.02.06.001.00025 Pipa PVC dia. 4inch. AW 0.900 Batang 558,850 502,965.00
1.1.7.02.02.06.001.00019 Pipa PVC dia. 1inch. AW 0.200 Batang 76,500 15,300.00
2.01.01.01.02.001 Galian tanah, dalam s/d 1 m 3.375 m3 81,363.00 274,600.13
1.1.7.01.01.01.005.00008 Batu Kerikil 1.050 m3 267,050 280,402.50
2.01.01.01.02.009 Urugan tanah kembali 1.125 m3 59,225.00 66,628.13
Jumlah Harga Bahan 7,374,347.85
Peralatan
Jumlah Harga Peralatan
Jumlah 7,374,347.85
Overhead & Profit 15 % 1,106,152.18

Nilai HSPK : 8,480,501.00


2.01.01.07.02.034 Septictank Pas. Bata + Rembesan Unit Nilai HSPK 10,645,994.00
kap. 6,00 m3 (dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
2.01.01.01.02.001 Galian tanah, dalam s/d 1 m 6.000 m3 81,363.00 488,178.00
2.01.01.01.02.019 Pas. Urugan pasir 0.300 m3 256,864.00 77,059.20
2.01.01.03.01.001 Pas. Lantai kerja beton tumbuk 1:3:5 3.000 m2 965,573.00 2,896,719.00

2.01.01.04.01.002 Pas. Dinding batu bata; ad 1:2 17.000 m2 156,037.00 2,652,629.00


2.01.01.04.02.002 Pas. Plester acian; ad. 1:2 20.000 m2 75,037.00 1,500,740.00
2.01.01.03.01.006 Beton K - 200 0.360 m3 1,327,090.00 477,752.40
1.1.7.02.02.06.001.00025 Pipa PVC dia. 4inch. AW 0.900 Batang 558,850 502,965.00

97
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
1.1.7.02.02.06.001.00019 Pipa PVC dia. 1inch. AW 0.200 m' 76,500 15,300.00
2.01.01.01.02.001 Galian tanah, dalam s/d 1 m 3.375 m3 81,363.00 274,600.13
1.1.7.01.01.01.005.00009 Batu Kerikil 1.050 m3 290,300 304,815.00
2.01.01.01.02.009 Urugan tanah kembali 1.125 m3 59,225.00 66,628.13
Jumlah Harga Bahan 9,257,385.85
Peralatan
Jumlah Harga Peralatan
Jumlah 9,257,385.85
Overhead & Profit 15 % 1,388,607.88

Nilai HSPK : 10,645,994.00


2.01.01.07.02.035 Pas. Meja Pantry uk. 600x 1500 mm Unit Nilai HSPK 1,581,289.00
(dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
2.01.01.03.01.006 Beton K - 200 0.090 m3 1,327,090.00 119,438.10
2.01.01.03.01.014 Tulangan besi beton U-24 9.000 Kg 22,769.00 204,921.00
2.01.01.03.02.005 Bekisting beton plat lantai 0.990 m2 707,379.00 700,305.21
2.01.01.05.02.004 Pas. Dinding Keramik 300x300 0.990 m2 353,908.00 350,368.92
Jumlah Harga Bahan 1,375,033.23
Peralatan
Jumlah Harga Peralatan
Jumlah 1,375,033.23
Overhead & Profit 15 % 206,254.98

Nilai HSPK : 1,581,289.00


2.01.01.07.03 Pekerjaan Besi & Allumunium

2.01.01.07.03.001 1 Kg Pemasangan Besi Profil IWF Kg Nilai HSPK 34,319.00


(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.003 O.H 130,000 390.00
1.10.28.02.01.001.002 Kepala Tukang 0.006 O.H 120,000 720.00
1.10.28.02.01.001.008 Tukang Besi 0.060 O.H 110,000 6,600.00
1.10.28.02.01.002.001 Pekerja 0.060 O.H 90,000 5,400.00
Jumlah Harga Tenaga Kerja 13,110.00
Bahan
1.1.7.01.01.01.008.00040 Besi WF 1.150 Kg 14,550 16,732.50
Jumlah Harga Bahan 16,732.50
Peralatan
Jumlah Harga Peralatan
Jumlah 29,842.50
Overhead & Profit 15 % 4,476.38

Nilai HSPK : 34,319.00


2.01.01.07.03.002 1 Kg Pemasangan Besi Siku Kg Nilai HSPK 32,732.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.003 O.H 130,000 390.00
1.10.28.02.01.001.002 Kepala Tukang 0.006 O.H 120,000 720.00
1.10.28.02.01.001.008 Tukang Besi 0.060 O.H 110,000 6,600.00
1.10.28.02.01.002.001 Pekerja 0.060 O.H 90,000 5,400.00
Jumlah Harga Tenaga Kerja 13,110.00
Bahan
1.1.7.01.01.01.008.00039 Besi Siku L Uk. 30 x 30 x 3 1.150 Kg 13,350 15,352.50
Jumlah Harga Bahan 15,352.50
Peralatan
Jumlah Harga Peralatan
Jumlah 28,462.50
Overhead & Profit 15 % 4,269.38

Nilai HSPK : 32,732.00

98
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
2.01.01.07.03.003 1 Kg Pemasangan Besi Profil C Kg Nilai HSPK 33,526.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.003 O.H 130,000 390.00
1.10.28.02.01.001.002 Kepala Tukang 0.006 O.H 120,000 720.00
1.10.28.02.01.001.008 Tukang Besi 0.060 O.H 110,000 6,600.00
1.10.28.02.01.002.001 Pekerja 0.060 O.H 90,000 5,400.00
Jumlah Harga Tenaga Kerja 13,110.00
Bahan
1.1.7.01.01.01.008.00066 Besi Profil C 100 mm s/d 150 mm 1.150 Kg 13,950 16,042.50

Jumlah Harga Bahan 16,042.50


Peralatan
Jumlah Harga Peralatan
Jumlah 29,152.50
Overhead & Profit 15 % 4,372.88

Nilai HSPK : 33,526.00


2.01.01.07.03.004 100 Kg Pekerjaan Perakitan Besi Kg Nilai HSPK 92,915.00
Profil (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.005 O.H 130,000 650.00
1.10.28.02.01.001.002 Kepala Tukang 0.010 O.H 120,000 1,200.00
1.10.28.02.01.001.008 Tukang Besi 0.100 O.H 110,000 11,000.00
1.10.28.02.01.002.001 Pekerja 0.100 O.H 90,000 9,000.00
Jumlah Harga Tenaga Kerja 21,850.00
Bahan
1.1.7.01.01.04.001.00006 Solar Industri 0.100 Liter 14,450 1,445.00
1.1.7.01.01.01.022.00126 Mur Baut Uk. 10 mm 10.000 bh 5,750 57,500.00
Jumlah Harga Bahan 58,945.00
Peralatan
Jumlah Harga Peralatan
Jumlah 80,795.00
Overhead & Profit 15 % 12,119.25

Nilai HSPK : 92,915.00


2.01.01.07.03.005 1 Cm Pekerjaan Pengelasan Dengan cm Nilai HSPK 5,137.00
Las Listrik (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.0002 O.H 130,000 26.00
1.10.28.02.01.001.002 Kepala Tukang 0.0002 O.H 120,000 24.00
1.10.28.02.01.001.008 Tukang Besi 0.0020 O.H 110,000 220.00
1.10.28.02.01.002.001 Pekerja 0.0040 O.H 90,000 360.00
Jumlah Harga Tenaga Kerja 630.00
Bahan
1.1.7.01.01.05.001.00019 Kawat Las 0.0400 Kg 38,100 1,524.00
1.1.7.01.01.04.001.00006 Solar Industri 0.0300 liter 14,450 433.50
1.1.7.01.01.04.002.00001 Minyak Pelumas 0.0040 liter 43,000 172.00
Jumlah Harga Bahan 2,129.50
Peralatan
9.1.2.09.03.01.001.00083 Sewa Alat Pengelasan 0.0170 Jam 100,420 1,707.14
Jumlah Harga Peralatan 1,707.14
Jumlah 4,466.64
Overhead & Profit 15 % 670.00

Nilai HSPK : 5,137.00


2.01.01.07.03.006 1 m2 Pemasangan Rangka Besi m2 Nilai HSPK 200,967.00
Hollow 1.40.40.2 Mm, Modul 60.120 (dibulatkan) :
Dinding Partisi Penutup Kalsiboard

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.013 O.H 130,000 1,690.00
1.10.28.02.01.001.002 Kepala Tukang 0.025 O.H 120,000 3,000.00
1.10.28.02.01.001.008 Tukang Besi 0.250 O.H 110,000 27,500.00

99
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
1.10.28.02.01.002.001 Pekerja 0.250 O.H 90,000 22,500.00
Jumlah Harga Tenaga Kerja 54,690.00
Bahan
1.1.7.01.01.01.022.00220 Hollow Plafond Galvalum t=0,35 mm, 0.875 Btg 32,550 28,481.25
4 x 4 x 400 cm
1.1.7.01.01.01.022.00076 Kalsiboard Uk. 240 x 120 x 4,5 mm Ex 0.860 Lembar 99,500 85,570.00
Eternit Gresik
1.1.7.01.01.01.022.00135 Sekrup Mata Tutup RRT, Uk. 1 0.250 Set 24,050 6,012.50
Jumlah Harga Bahan 120,063.75
Peralatan
Jumlah Harga Peralatan
Jumlah 174,753.75
Overhead & Profit 15 % 26,213.06

Nilai HSPK : 200,967.00


2.01.01.07.03.007 1 m' Pekerjaan Kusen Alluminium m' Nilai HSPK 207,112.00
4inch. (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.0021 O.H 130,000 273.00
1.10.28.02.01.001.002 Kepala Tukang 0.0043 O.H 120,000 516.00
1.10.28.02.01.001.004 Tukang Kayu 0.043 O.H 110,000 4,730.00
1.10.28.02.01.002.001 Pekerja 0.043 O.H 90,000 3,870.00
Jumlah Harga Tenaga Kerja 9,389.00
Bahan
1.1.7.01.01.01.022.00084 Profil Alumunium T 1.100 m 94,350 103,785.00
1.1.7.01.01.01.022.00138 Sekrup Mata Tutup RRT, Uk. 4 2.000 Buah 33,100 66,200.00
1.1.7.01.01.01.022.00275 Lem Dextone Silicone Rubber Sealant 0.060 Tube 12,050 723.00

Jumlah Harga Bahan 170,708.00


Peralatan
Jumlah Harga Peralatan
Jumlah 180,097.00
Overhead & Profit 15 % 27,014.55

Nilai HSPK : 207,112.00


2.01.01.07.03.008 1 m' Pekerjaan Kusen Alluminium m' Nilai HSPK 220,274.00
3inch. (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.0021 O.H 130,000 273.00
1.10.28.02.01.001.002 Kepala Tukang 0.0043 O.H 120,000 516.00
1.10.28.02.01.001.004 Tukang Kayu 0.043 O.H 110,000 4,730.00
1.10.28.02.01.002.001 Pekerja 0.043 O.H 90,000 3,870.00
Jumlah Harga Tenaga Kerja 9,389.00
Bahan
1.1.7.01.01.01.022.00065 Kusen Aluminium Alexindo, 3inch. 1.100 m 110,300 121,330.00
Coklat
1.1.7.01.01.01.022.00137 Sekrup Mata Tutup RRT, Uk. 3 2.000 Buah 30,050 60,100.00
1.1.7.01.01.01.022.00275 Lem Dextone Silicone Rubber Sealant 0.060 Tube 12,050 723.00

Jumlah Harga Bahan 182,153.00


Peralatan
Jumlah Harga Peralatan
Jumlah 191,542.00
Overhead & Profit 15 % 28,731.30

Nilai HSPK : 220,274.00


2.01.01.07.03.009 1 m2 Pasang Rangka Atap Galvalume m2 Nilai HSPK 259,380.00
Untuk Genteng Asbes/Spandex (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.050 Oh 130,000 6,500.00
1.10.28.02.01.001.002 Kepala Tukang 0.010 Oh 120,000 1,200.00
1.10.28.02.01.001.008 Tukang Besi 0.450 Oh 110,000 49,500.00
1.10.28.02.01.002.001 Pekerja 0.200 Oh 90,000 18,000.00

100
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Jumlah Harga Tenaga Kerja 75,200.00
Bahan
1.1.7.01.01.01.022.00213 Kanal Galvalum C 80 x 75 mm - 6m 0.248 Batang 98,700 24,477.60

1.1.7.01.01.01.022.00214 Kanal Galvalum 0,75 mm 0.372 Batang 92,900 34,558.80


1.1.7.01.01.01.022.00119 Baut Screw Driver 28.000 Buah 1,400 39,200.00
1.1.7.01.01.01.022.00143 Dynabolt 1.600 Buah 12,000 19,200.00
1.1.7.01.01.01.022.00217 Reng Galvalum 35 x 40 mm - 6m 0.600 Batang 46,450 27,870.00
1.1.7.01.01.01.022.00223 Talang Galvalum 90, Tebal 0,3 0.124 m' 40,650 5,040.60
Jumlah Harga Bahan 150,347.00
Peralatan
Jumlah Harga Peralatan
Jumlah 225,547.00
Overhead & Profit 15 % 33,832.05

Nilai HSPK : 259,380.00


2.01.01.07.03.010 1 m2 Pasang Rangka Atap Galvalume m2 Nilai HSPK 291,505.00
Untuk Genteng Biasa/Metal (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.050 Oh 130,000 6,500.00
1.10.28.02.01.001.002 Kepala Tukang 0.010 Oh 120,000 1,200.00
1.10.28.02.01.001.008 Tukang Besi 0.450 Oh 110,000 49,500.00
1.10.28.02.01.002.001 Pekerja 0.200 Oh 90,000 18,000.00
Jumlah Harga Tenaga Kerja 75,200.00
Bahan
1.1.7.01.01.01.022.00213 Kanal Galvalum C 80 x 75 mm - 6m 0.248 Batang 98,700 24,477.60

1.1.7.01.01.01.022.00214 Kanal Galvalum 0,75 mm 0.372 Batang 92,900 34,558.80


1.1.7.01.01.01.022.00119 Baut Screw Driver 38.000 bh 1,400 53,200.00
1.1.7.01.01.01.022.00143 Dynabolt 1.600 bh 12,000 19,200.00
1.1.7.01.01.01.022.00217 Reng Galvalum 35 x 40 mm - 6m 0.900 Batang 46,450 41,805.00
1.1.7.01.01.01.022.00223 Talang Galvalum 90, Tebal 0,3 0.124 m' 40,650 5,040.60
Jumlah Harga Bahan 178,282.00
Peralatan
Jumlah Harga Peralatan
Jumlah 253,482.00
Overhead & Profit 15 % 38,022.30

Nilai HSPK : 291,505.00


2.01.01.07.03.011 1 m2 Pasang Rangka Langit-Langit m2 Nilai HSPK 98,821.00
Hollow 40.40.2, Modul 60.60 (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.018 O.H 130,000 2,340.00
1.10.28.02.01.001.002 Kepala Tukang 0.035 O.H 120,000 4,200.00
1.10.28.02.01.001.008 Tukang Besi 0.350 O.H 110,000 38,500.00
1.10.28.02.01.002.001 Pekerja 0.350 O.H 90,000 31,500.00
Jumlah Harga Tenaga Kerja 76,540.00
Bahan
1.1.7.01.01.01.022.00220 Hollow Plafond Galvalum t=0,35 mm, 0.104 Btg 32,550 3,378.69
4 x 4 x 400 cm
1.1.7.01.01.01.022.00135 Sekrup Mata Tutup RRT, Uk. 1 0.250 Kg 24,050 6,012.50
Jumlah Harga Bahan 9,391.19
Peralatan
Jumlah Harga Peralatan
Jumlah 85,931.19
Overhead & Profit 15 % 12,889.68

Nilai HSPK : 98,821.00


2.01.01.07.03.012 1 m2 Pekerjaan Pasang Pintu Kaca m2 Nilai HSPK 1,272,773.00
Rangka Alluminium (dibulatkan) :

Tenaga Kerja

101
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
1.10.28.02.01.001.001 Mandor 0.005 O.H 130,000 650.00
1.10.28.02.01.001.002 Kepala Tukang 0.009 O.H 120,000 1,080.00
1.10.28.02.01.001.004 Tukang Kayu 0.085 O.H 110,000 9,350.00
1.10.28.02.01.002.001 Pekerja 0.085 O.H 90,000 7,650.00
Jumlah Harga Tenaga Kerja 18,730.00
Bahan
1.1.7.01.01.01.022.00066 Kusen Aluminium Alexindo, 4inch. 4.400 m 127,750 562,100.00
Coklat
1.1.7.01.01.01.003.00005 Kaca Rayben, 5 Mm 4.500 m2 116,150 522,675.00
1.1.7.01.01.01.022.00275 Lem Dextone Silicone Rubber Sealant 0.270 Tube 12,050 3,253.50

Jumlah Harga Bahan 1,088,028.50


Peralatan
Jumlah Harga Peralatan
Jumlah 1,106,758.50
Overhead & Profit 15 % 166,013.78

Nilai HSPK : 1,272,773.00


2.01.01.07.03.013 1 m2 Pekerjaan Pemasangan Pintu m2 Nilai HSPK 1,370,428.00
Alluminium Strip Lebar 8 Cm (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.004 O.H 130,000 546.00
1.10.28.02.01.001.002 Kepala Tukang 0.009 O.H 120,000 1,020.00
1.10.28.02.01.001.004 Tukang Kayu 0.085 O.H 110,000 9,350.00
1.10.28.02.01.002.001 Pekerja 0.085 O.H 90,000 7,650.00
Jumlah Harga Tenaga Kerja 18,566.00
Bahan
1.1.7.01.01.01.022.00066 Kusen Aluminium Alexindo, 4inch. 4.400 m 127,750 562,100.00
Coklat
1.1.7.01.01.01.022.00043 Aluminium Strip 14.600 m 41,850 611,010.00
Jumlah Harga Bahan 1,173,110.00
Peralatan
Jumlah Harga Peralatan
Jumlah 1,191,676.00
Overhead & Profit 15 % 178,751.40

Nilai HSPK : 1,370,428.00


2.01.01.07.03.014 1 m2 Pekerjaan Pemasangan Rolling m2 Nilai HSPK 637,250.00
Door Besi (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.006 O.H 130,000 780.00
1.10.28.02.01.001.002 Kepala Tukang 0.120 O.H 120,000 14,400.00
1.10.28.02.01.001.008 Tukang Besi 1.200 O.H 110,000 132,000.00
1.10.28.02.01.002.001 Pekerja 1.200 O.H 90,000 108,000.00
Jumlah Harga Tenaga Kerja 255,180.00
Bahan
1.1.7.01.01.01.022.00045 Pintu Rolling Door Besi, 0,4 mm 1.000 m2 298,950 298,950.00
Jumlah Harga Bahan 298,950.00
Peralatan
Jumlah Harga Peralatan
Jumlah 554,130.00
Overhead & Profit 15 % 83,119.50

Nilai HSPK : 637,250.00


2.01.01.07.03.015 1 m2 Pekerjaan Pemasangan Rolling m2 Nilai HSPK 892,170.00
Door Alumunium (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.050 O.H 130,000 6,500.00
1.10.28.02.01.001.002 Kepala Tukang 0.100 O.H 120,000 12,000.00
1.10.28.02.01.001.008 Tukang Besi 1.000 O.H 110,000 110,000.00
1.10.28.02.01.002.001 Pekerja 1.000 O.H 90,000 90,000.00
Jumlah Harga Tenaga Kerja 218,500.00
Bahan

102
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
1.1.7.01.01.01.022.00046 Pintu Rolling Door Aluminium, 1 mm 1.000 m2 557,300 557,300.00

Jumlah Harga Bahan 557,300.00


Peralatan
Jumlah Harga Peralatan
Jumlah 775,800.00
Overhead & Profit 15 % 116,370.00

Nilai HSPK : 892,170.00


2.01.01.07.03.016 1 m2 Pekerjaan Pemasangan Pintu m2 Nilai HSPK 499,664.00
Besi Lipat (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.022 O.H 130,000 2,860.00
1.10.28.02.01.001.002 Kepala Tukang 0.044 O.H 120,000 5,280.00
1.10.28.02.01.001.008 Tukang Besi 0.440 O.H 110,000 48,400.00
1.10.28.02.01.002.001 Pekerja 0.440 O.H 90,000 39,600.00
Jumlah Harga Tenaga Kerja 96,140.00
Bahan
1.1.7.01.01.01.022.00053 Pintu Besi Lipat 1.000 m2 338,350 338,350.00
Jumlah Harga Bahan 338,350.00
Peralatan
Jumlah Harga Peralatan
Jumlah 434,490.00
Overhead & Profit 15 % 65,173.50

Nilai HSPK : 499,664.00


2.01.01.07.03.017 1 m2 Pekerjaan Pasang Jendela m2 Nilai HSPK 417,218.00
Nako Dan Teralis (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.001 O.H 130,000 130.00
1.10.28.02.01.001.002 Kepala Tukang 0.020 O.H 120,000 2,400.00
1.10.28.02.01.001.004 Tukang Kayu 0.200 O.H 110,000 22,000.00
1.10.28.02.01.002.001 Pekerja 0.200 O.H 90,000 18,000.00
Jumlah Harga Tenaga Kerja 42,530.00
Bahan
1.1.7.01.01.01.003.00013 Kaca Krepyak Nako 1.100 Daun 23,250 25,575.00
1.1.7.01.01.01.022.00135 Sekrup Mata Tutup RRT, Uk. 1 10.000 Buah 24,050 240,500.00
1.1.7.01.01.01.008.00010 Besi Plat StripUk. 3 x 30 mm x 6 m 1.167 Batang 46,450 54,193.22

Jumlah Harga Bahan 320,268.22


Peralatan
Jumlah Harga Peralatan
Jumlah 362,798.22
Overhead & Profit 15 % 54,419.73

Nilai HSPK : 417,218.00


2.01.01.07.03.018 1 m2 Pekerjaan Pasang Terali Besi m2 Nilai HSPK 662,288.00
Strip (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.083 O.H 130,000 10,790.00
1.10.28.02.01.001.002 Kepala Tukang 0.167 O.H 120,000 20,040.00
1.10.28.02.01.001.013 Tukang Las 1.670 O.H 110,000 183,700.00
1.10.28.02.01.002.001 Pekerja 1.670 O.H 90,000 150,300.00
Jumlah Harga Tenaga Kerja 364,830.00
Bahan
1.1.7.01.01.01.008.00009 Besi Plat Strip 6.177 Kg 11,650 71,962.05
2.01.01.07.03.005 Pengelasan 27.080 cm 5,137.00 139,109.96
Jumlah Harga Bahan 211,072.01
Peralatan
Jumlah Harga Peralatan
Jumlah 575,902.01
Overhead & Profit 15 % 86,385.30

Nilai HSPK : 662,288.00

103
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
2.01.01.07.03.019 1 m' Pekerjaan Pasang Talang m' Nilai HSPK 355,915.00
Datar/Jurai Seng Bjls 28 Lebar 90 (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.001 O.H 130,000 130.00
1.10.28.02.01.001.002 Kepala Tukang 0.020 O.H 120,000 2,400.00
1.10.28.02.01.001.004 Tukang Kayu 0.200 O.H 110,000 22,000.00
1.10.28.02.01.002.001 Pekerja 0.200 O.H 90,000 18,000.00
Jumlah Harga Tenaga Kerja 42,530.00
Bahan
1.1.7.01.01.01.007.00016 Seng Plat BJLS 28 Uk. 3inch. x 6inch. 1.050 m' 96,400 101,220.00

1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.015 Kg 19,550 293.25


1.1.7.01.01.05.002.00021 Kayu Kruing, Papan, Uk. 2 x 20 x 400 0.019 m3 8,707,750 165,447.25
cm
Jumlah Harga Bahan 266,960.50
Peralatan
Jumlah Harga Peralatan
Jumlah 309,490.50
Overhead & Profit 15 % 46,423.58

Nilai HSPK : 355,915.00


2.01.01.07.03.020 1 m' Pekerjaan Pasang Talang Miring m' Nilai HSPK 232,366.00
Seng Bjls 28 (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.001 O.H 130,000 169.00
1.10.28.02.01.001.002 Kepala Tukang 0.025 O.H 120,000 3,000.00
1.10.28.02.01.001.004 Tukang Kayu 0.400 O.H 110,000 44,000.00
1.10.28.02.01.002.001 Pekerja 0.150 O.H 90,000 13,500.00
Jumlah Harga Tenaga Kerja 60,669.00
Bahan
1.1.7.01.01.01.007.00016 Seng Plat BJLS 28 Uk. 3inch. x 6inch. 0.500 Lembar 96,400 48,200.00

1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.015 Kg 19,550 293.25


1.1.7.01.01.05.002.00021 Kayu Kruing, Papan, Uk. 2 x 20 x 400 0.010 m3 8,707,750 83,594.40
cm
1.1.7.01.01.01.006.00006 Cat Meni Besi 0.250 Kg 37,200 9,300.00
Jumlah Harga Bahan 141,387.65
Peralatan
Jumlah Harga Peralatan
Jumlah 202,056.65
Overhead & Profit 15 % 30,308.50

Nilai HSPK : 232,366.00


2.01.01.07.03.021 1 m' Pekerjaan Pasang Talang 1/2 m' Nilai HSPK 128,827.00
Lingkaran D-15 Cm Seng Bjls 30 (dibulatkan) :
Lebar 45 Cm

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.008 O.H 130,000 1,040.00
1.10.28.02.01.001.002 Kepala Tukang 0.030 O.H 120,000 3,600.00
1.10.28.02.01.001.004 Tukang Kayu 0.300 O.H 110,000 33,000.00
1.10.28.02.01.002.001 Pekerja 0.150 O.H 90,000 13,500.00
Jumlah Harga Tenaga Kerja 51,140.00
Bahan
1.1.7.01.01.01.007.00009 Seng Plat BJLS 28 Uk. 3inch. x 6inch. 1.050 Lembar 52,250 54,862.50

1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.010 Kg 19,550 195.50


1.1.7.01.01.01.008.00009 Besi Plat Strip 0.500 Kg 11,650 5,825.00
Jumlah Harga Bahan 60,883.00
Peralatan
Jumlah Harga Peralatan
Jumlah 112,023.00
Overhead & Profit 15 % 16,803.45

104
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f

Nilai HSPK : 128,827.00


2.01.01.07.03.022 1 m2 Pekerjaan Pemasangan Fitrase m2 Nilai HSPK 161,920.00
Ex. Corais & Aquirlda (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.040 O.H 130,000 5,200.00
1.10.28.02.01.001.004 Tukang Kayu 0.250 O.H 110,000 27,500.00
1.10.28.02.01.002.001 Pekerja 0.130 O.H 90,000 11,700.00
Jumlah Harga Tenaga Kerja 44,400.00
Bahan
1.1.7.01.01.01.003.00017 Kaca Fitrase 2.000 m2 48,200 96,400.00
Jumlah Harga Bahan 96,400.00
Peralatan
Jumlah Harga Peralatan
Jumlah 140,800.00
Overhead & Profit 15 % 21,120.00

Nilai HSPK : 161,920.00


2.01.01.07.03.023 1 m2 Pekerjaan Pemasangan Sun m2 Nilai HSPK 444,613.00
Screen (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.004 O.H 130,000 520.00
1.10.28.02.01.001.002 Kepala Tukang 0.080 O.H 120,000 9,600.00
1.10.28.02.01.001.004 Tukang Kayu 0.800 O.H 110,000 88,000.00
1.10.28.02.01.002.001 Pekerja 0.080 O.H 90,000 7,200.00
Jumlah Harga Tenaga Kerja 105,320.00
Bahan
1.1.7.01.01.01.003.00018 Kaca Sun Screen 1.000 m2 281,300 281,300.00
Jumlah Harga Bahan 281,300.00
Peralatan
Jumlah Harga Peralatan
Jumlah 386,620.00
Overhead & Profit 15 % 57,993.00

Nilai HSPK : 444,613.00


2.01.01.07.03.024 1 m2 Pekerjaan Pemasangan m2 Nilai HSPK 242,581.00
Vertical Blind Dan Venetions Blind (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.018 O.H 130,000 2,340.00
1.10.28.02.01.001.002 Kepala Tukang 0.035 O.H 120,000 4,200.00
1.10.28.02.01.001.008 Tukang Besi 0.350 O.H 110,000 38,500.00
1.10.28.02.01.002.001 Pekerja 0.350 O.H 90,000 31,500.00
Jumlah Harga Tenaga Kerja 76,540.00
Bahan
1.1.7.01.01.01.003.00015 Kaca Vertical Blind 1.000 m2 134,400 134,400.00
Jumlah Harga Bahan 134,400.00
Peralatan
Jumlah Harga Peralatan
Jumlah 210,940.00
Overhead & Profit 15 % 31,641.00

Nilai HSPK : 242,581.00


2.01.01.07.03.025 1 m2 Pekerjaan Pemasangan Kawat m2 Nilai HSPK 154,168.00
Nyamuk (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.005 O.H 130,000 650.00
1.10.28.02.01.001.002 Kepala Tukang 0.010 O.H 120,000 1,200.00
1.10.28.02.01.001.004 Tukang Kayu 0.100 O.H 110,000 11,000.00
1.10.28.02.01.002.001 Pekerja 0.100 O.H 90,000 9,000.00
Jumlah Harga Tenaga Kerja 21,850.00
Bahan
1.1.7.01.01.05.001.00011 Kawat Nyamuk Kasa, Aluminium 1.100 m2 31,950 35,145.00
2.01.01.07.03.005 Pengelasan 11.110 cm 5,137.00 57,072.07

105
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
1.1.7.01.01.01.008.00009 Besi Plat Strip 1.716 Kg 11,650 19,991.40
Jumlah Harga Bahan 112,208.47
Peralatan
Jumlah Harga Peralatan
Jumlah 134,058.47
Overhead & Profit 15 % 20,108.77

Nilai HSPK : 154,168.00


2.01.01.07.03.026 1 m2 Pekerjaan Pemasangan Pagar m2 Nilai HSPK 698,993.00
Model Brc/Pmg A (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.008 Tukang Besi 0.017 O.H 110,000 1,870.00
1.10.28.02.01.001.006 Tukang Batu 1.050 O.H 110,000 115,500.00
1.10.28.02.01.002.001 Pekerja 1.050 O.H 90,000 94,500.00
Jumlah Harga Tenaga Kerja 211,870.00
Bahan
1.1.7.01.01.01.022.00061 Panel Pagar BRC BRC 120 HD, 6 mm 1.000 Unit 395,950 395,950.00

Jumlah Harga Bahan 395,950.00


Peralatan
Jumlah Harga Peralatan
Jumlah 607,820.00
Overhead & Profit 15 % 91,173.00

Nilai HSPK : 698,993.00


2.01.01.07.03.027 Pekerjaan Pemasangan Pasang Tiang Unit Nilai HSPK 474,835.00
Pagar Model Pmg 2inch. Tinggi 1,5 (dibulatkan) :
M
Tenaga Kerja
1.10.28.02.01.001.008 Tukang Besi 0.500 O.H 110,000 55,000.00
1.10.28.02.01.002.001 Pekerja 0.500 O.H 90,000 45,000.00
Jumlah Harga Tenaga Kerja 100,000.00
Bahan
1.1.7.02.02.07.001.00060 Pipa Stainless Dia, 2inch. @ 6m 1.000 Batang 312,900 312,900.00
(heinse Merah)
Jumlah Harga Bahan 312,900.00
Peralatan
Jumlah Harga Peralatan
Jumlah 412,900.00
Overhead & Profit 15 % 61,935.00

Nilai HSPK : 474,835.00


2.01.01.07.03.028 Pekerjaan Pasang 1 Unit Daun Pintu Unit Nilai HSPK 2,110,768.00
Swing Ganda Type Brc/Pmg Uk. (dibulatkan) :
(1,2M X 3M)

Tenaga Kerja
1.10.28.02.01.001.008 Tukang Besi 1.050 O.H 110,000 115,500.00
1.10.28.02.01.002.001 Pekerja 1.050 O.H 90,000 94,500.00
Jumlah Harga Tenaga Kerja 210,000.00
Bahan
1.1.7.01.01.01.022.00052 Pintu Swing Ganda BRC/PMG Uk. 1.2 1.000 unit 1,625,450 1,625,450.00
x 3.00 m2
Jumlah Harga Bahan 1,625,450.00
Peralatan
Jumlah Harga Peralatan
Jumlah 1,835,450.00
Overhead & Profit 15 % 275,317.50

Nilai HSPK : 2,110,768.00


2.01.01.07.03.029 1 m' Railing Tangga Besi Hollow m' Nilai HSPK 287,830.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.008 O.H 130,000 1,040.00

106
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
1.10.28.02.01.001.002 Kepala Tukang 0.008 O.H 120,000 960.00
1.10.28.02.01.001.008 Tukang Besi 0.075 O.H 110,000 8,250.00
1.10.28.02.01.002.001 Pekerja 0.150 O.H 90,000 13,500.00
Jumlah Harga Tenaga Kerja 23,750.00
Bahan
1.1.7.01.01.01.008.00086 Besi Hollow Uk. 40 x 40 Tebal 1,2 1.035 Btg 112,650 116,536.43
mm
1.1.7.01.01.01.022.00126 Mur Baut Uk. 10 mm 6.000 bh 5,750 34,500.00
1.1.7.01.01.01.006.00001 Cat Besi Warna Hitam 1.000 Kg 75,500 75,500.00
Jumlah Harga Bahan 226,536.43
Peralatan
Jumlah Harga Peralatan
Jumlah 250,286.43
Overhead & Profit 15 % 37,542.96

Nilai HSPK : 287,830.00


2.01.01.07.03.030 1 m2 Kanopi rangka besi hollow & m2 Nilai HSPK 265,682.00
Penutup atap Polycarbonate (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.008 O.H 130,000 1,040.00
1.10.28.02.01.001.002 Kepala Tukang 0.008 O.H 120,000 960.00
1.10.28.02.01.001.008 Tukang Besi 0.075 O.H 110,000 8,250.00
1.10.28.02.01.002.001 Pekerja 0.150 O.H 90,000 13,500.00
Jumlah Harga Tenaga Kerja 23,750.00
Bahan
1.1.7.01.01.01.008.00086 Besi Hollow Uk. 40 x 40 Tebal 1,2 1.724 Btg 112,650 194,231.13
mm
1.1.7.01.01.01.022.00291 PolyCarbonate Twinlite, L. 2,1 m 0.040 m2 144,700 5,845.88
P.11,8 m T.6 mm
1.1.7.01.01.01.022.00087 Paku payung 6.000 bh 1,200 7,200.00
Jumlah Harga Bahan 207,277.01
Peralatan
Jumlah Harga Peralatan
Jumlah 231,027.01
Overhead & Profit 15 % 34,654.05

Nilai HSPK : 265,682.00


2.01.01.07.03.031 1 m2 Pembuatan & Pemasangan m2 Nilai HSPK 488,055.00
Pagar Besi Hollow (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.052 O.H 130,000 6,760.00
1.10.28.02.01.001.002 Kepala Tukang 0.105 O.H 120,000 12,600.00
1.10.28.02.01.001.008 Tukang Besi 1.050 O.H 110,000 115,500.00
1.10.28.02.01.002.001 Pekerja 1.050 O.H 90,000 94,500.00
Jumlah Harga Tenaga Kerja 229,360.00
Bahan
1.1.7.01.01.01.008.00086 Besi Hollow Uk. 40 x 40 Tebal 1,2 1.724 Btg 112,650 194,231.13
mm
1.1.7.01.01.05.001.00017 Kawat Ikat (Bendrat) Besi Uk. 0,1 cm 0.002 Roll 402,000 804.00
x 25 Kg
Jumlah Harga Bahan 195,035.13
Peralatan
Jumlah Harga Peralatan
Jumlah 424,395.13
Overhead & Profit 15 % 63,659.27

Nilai HSPK : 488,055.00


2.01.01.07.03.032 1 m2 Pembuatan & Pemasangan m2 Nilai HSPK 585,194.00
Pagar Besi Tempa (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.052 O.H 130,000 6,760.00

107
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
1.10.28.02.01.001.002 Kepala Tukang 0.105 O.H 120,000 12,600.00
1.10.28.02.01.001.008 Tukang Besi 1.050 O.H 110,000 115,500.00
1.10.28.02.01.002.001 Pekerja 1.050 O.H 90,000 94,500.00
Jumlah Harga Tenaga Kerja 229,360.00
Bahan
1.1.7.01.01.01.008.00084 Besi tempa 1.200 m2 232,250 278,700.00
1.1.7.01.01.05.001.00017 Kawat Ikat (Bendrat) Besi Uk. 0,1 cm 0.002 Roll 402,000 804.00
x 25 Kg
Jumlah Harga Bahan 279,504.00
Peralatan
Jumlah Harga Peralatan
Jumlah 508,864.00
Overhead & Profit 15 % 76,329.60

Nilai HSPK : 585,194.00


2.01.01.07.03.033 1 unit Kusen Pintu Alminium uk. 1,00 unit Nilai HSPK 4,612,938.00
x 2,60 (dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
1.1.7.01.01.01.022.00065 Kusen Aluminium Alexindo, 3inch. 7.200 m' 110,300 794,160.00
Coklat
1.1.7.01.01.01.022.00066 Kusen Aluminium Alexindo, 4inch. 8.400 m' 127,750 1,073,100.00
Coklat
1.1.7.01.01.01.003.00002 Kaca Polos Bening, 5 Mm 13.600 m2 116,150 1,579,640.00
1.1.7.01.01.01.022.00072 Karet 1.000 m' 7,550 7,550.00
1.1.7.01.01.01.022.00393 Handle KP, Ex Alpha, + Kunci 1.000 bh 161,950 161,950.00
1.1.7.01.01.01.022.00367 Kunci Silinder 1.000 bh 63,900 63,900.00
1.1.7.01.01.01.022.00341 Grendel Pintu, Tanam 1.000 set 97,500 97,500.00
1.1.7.01.01.01.022.00383 Kait Angin 1.000 set 18,900 18,900.00
1.1.7.01.01.01.022.00385 Door Stop 1.000 bh 25,250 25,250.00
1.1.7.01.01.01.022.00384 Door Closer 1.000 bh 166,050 166,050.00
1.1.7.01.01.01.022.00368 Kunci Selot 1.000 set 23,250 23,250.00
Jumlah Harga Bahan 4,011,250.00
Peralatan
Jumlah Harga Peralatan
Jumlah 4,011,250.00
Overhead & Profit 15 % 601,687.50

Nilai HSPK : 4,612,938.00


2.01.01.07.04 Pekerjaan Kunci Dan Kaca
2.01.01.07.04.001 Pekerjaan Pemasangan 1 Buah Kunci Buah Nilai HSPK 257,761.00
Tanam Antik (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.003 O.H 130,000 390.00
1.10.28.02.01.001.002 Kepala Tukang 0.060 O.H 120,000 7,200.00
1.10.28.02.01.001.004 Tukang Kayu 0.600 O.H 110,000 66,000.00
1.10.28.02.01.002.001 Pekerja 0.060 O.H 90,000 5,400.00
Jumlah Harga Tenaga Kerja 78,990.00
Bahan
1.1.7.01.01.01.022.00362 Kunci Tanam, Antik 1.000 Buah 145,150 145,150.00
Jumlah Harga Bahan 145,150.00
Peralatan
Jumlah Harga Peralatan
Jumlah 224,140.00
Overhead & Profit 15 % 33,621.00

Nilai HSPK : 257,761.00


2.01.01.07.04.002 Pekerjaan Pemasangan 1 Buah Kunci Buah Nilai HSPK 151,513.00
Tanam Biasa (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.005 O.H 130,000 650.00
1.10.28.02.01.001.002 Kepala Tukang 0.050 O.H 120,000 6,000.00
1.10.28.02.01.001.004 Tukang Kayu 0.500 O.H 110,000 55,000.00

108
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
1.10.28.02.01.002.001 Pekerja 0.010 O.H 90,000 900.00
Jumlah Harga Tenaga Kerja 62,550.00
Bahan
1.1.7.01.01.01.022.00364 Kunci Tanam, Biasa 1.000 Buah 69,200 69,200.00
Jumlah Harga Bahan 69,200.00
Peralatan
Jumlah Harga Peralatan
Jumlah 131,750.00
Overhead & Profit 15 % 19,762.50

Nilai HSPK : 151,513.00


2.01.01.07.04.003 Pekerjaan Pemasangan 1 Buah Kunci Buah Nilai HSPK 157,884.00
Tanam Kamar Mandi (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.003 O.H 130,000 390.00
1.10.28.02.01.001.002 Kepala Tukang 0.050 O.H 120,000 6,000.00
1.10.28.02.01.001.004 Tukang Kayu 0.500 O.H 110,000 55,000.00
1.10.28.02.01.002.001 Pekerja 0.005 O.H 90,000 450.00
Jumlah Harga Tenaga Kerja 61,840.00
Bahan
1.1.7.01.01.01.022.00363 Kunci Tanam, Kamar Mandi 1.000 Buah 75,450 75,450.00
Jumlah Harga Bahan 75,450.00
Peralatan
Jumlah Harga Peralatan
Jumlah 137,290.00
Overhead & Profit 15 % 20,593.50

Nilai HSPK : 157,884.00


2.01.01.07.04.004 Pekerjaan Pemasangan 1 Buah Kunci Buah Nilai HSPK 144,601.00
Silinder (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.003 O.H 130,000 390.00
1.10.28.02.01.001.002 Kepala Tukang 0.050 O.H 120,000 6,000.00
1.10.28.02.01.001.004 Tukang Kayu 0.500 O.H 110,000 55,000.00
1.10.28.02.01.002.001 Pekerja 0.005 O.H 90,000 450.00
Jumlah Harga Tenaga Kerja 61,840.00
Bahan
1.1.7.01.01.01.022.00367 Kunci Silinder 1.000 Buah 63,900 63,900.00
Jumlah Harga Bahan 63,900.00
Peralatan
Jumlah Harga Peralatan
Jumlah 125,740.00
Overhead & Profit 15 % 18,861.00

Nilai HSPK : 144,601.00


2.01.01.07.04.005 Pekerjaan Pemasangan 1 Buah Buah Nilai HSPK 42,785.00
Engsel Pintu (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.0008 O.H 130,000 104.00
1.10.28.02.01.001.002 Kepala Tukang 0.015 O.H 120,000 1,800.00
1.10.28.02.01.001.004 Tukang Kayu 0.150 O.H 110,000 16,500.00
1.10.28.02.01.002.001 Pekerja 0.015 O.H 90,000 1,350.00
Jumlah Harga Tenaga Kerja 19,754.00
Bahan
1.1.7.01.01.01.022.00309 Engsel Dior 3 Kuning 1.000 Stel 17,450 17,450.00
Jumlah Harga Bahan 17,450.00
Peralatan
Jumlah Harga Peralatan
Jumlah 37,204.00
Overhead & Profit 15 % 5,580.60

Nilai HSPK : 42,785.00

109
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
2.01.01.07.04.006 Pekerjaan Pemasangan 1 Buah Buah Nilai HSPK 50,330.00
Engsel Jendela Kupu-Kupu (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.0005 O.H 130,000 65.00
1.10.28.02.01.001.002 Kepala Tukang 0.010 O.H 120,000 1,200.00
1.10.28.02.01.001.004 Tukang Kayu 0.100 O.H 110,000 11,000.00
1.10.28.02.01.002.001 Pekerja 0.010 O.H 90,000 900.00
Jumlah Harga Tenaga Kerja 13,165.00
Bahan
1.1.7.01.01.01.022.00319 Engsel Jendela 1.000 Stel 30,600 30,600.00
Jumlah Harga Bahan 30,600.00
Peralatan
Jumlah Harga Peralatan
Jumlah 43,765.00
Overhead & Profit 15 % 6,564.75

Nilai HSPK : 50,330.00


2.01.01.07.04.007 Pekerjaan Pemasangan 1 Buah Buah Nilai HSPK 53,033.00
Engsel Angin (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.0005 O.H 130,000 65.00
1.10.28.02.01.001.002 Kepala Tukang 0.020 O.H 120,000 2,400.00
1.10.28.02.01.001.004 Tukang Kayu 0.200 O.H 110,000 22,000.00
1.10.28.02.01.002.001 Pekerja 0.100 O.H 90,000 9,000.00
Jumlah Harga Tenaga Kerja 33,465.00
Bahan
1.1.7.01.01.01.022.00322 Engsel Angin, Kuningan 2inch. 1.000 Stel 12,650 12,650.00
Jumlah Harga Bahan 12,650.00
Peralatan
Jumlah Harga Peralatan
Jumlah 46,115.00
Overhead & Profit 15 % 6,917.25

Nilai HSPK : 53,033.00


2.01.01.07.04.008 Pekerjaan Pemasangan 1 Buah Buah Nilai HSPK 305,797.00
Engsel Hidrolis Pintu Almunium (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.002 Kepala Tukang 0.013 O.H 120,000 1,560.00
1.10.28.02.01.001.004 Tukang Kayu 0.125 O.H 110,000 13,750.00
Jumlah Harga Tenaga Kerja 15,310.00
Bahan
1.1.7.01.01.01.022.00314 Engsel Hidrolis Pintu Aluminium 1.000 Stel 250,600 250,600.00
Jumlah Harga Bahan 250,600.00
Peralatan
Jumlah Harga Peralatan
Jumlah 265,910.00
Overhead & Profit 15 % 39,886.50

Nilai HSPK : 305,797.00


2.01.01.07.04.009 Pekerjaan Pemasangan Spring Knip Stel Nilai HSPK 57,201.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.008 O.H 130,000 1,040.00
1.10.28.02.01.001.002 Kepala Tukang 0.015 O.H 120,000 1,800.00
1.10.28.02.01.001.004 Tukang Kayu 0.150 O.H 110,000 16,500.00
1.10.28.02.01.002.001 Pekerja 0.015 O.H 90,000 1,350.00
Jumlah Harga Tenaga Kerja 20,690.00
Bahan
1.1.7.01.01.01.022.00397 Spring Knip 1.000 buah 29,050 29,050.00
Jumlah Harga Bahan 29,050.00
Peralatan
Jumlah Harga Peralatan

110
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Jumlah 49,740.00
Overhead & Profit 15 % 7,461.00

Nilai HSPK : 57,201.00


2.01.01.07.04.010 Pemasangan 1 Buah Kait Angin Buah Nilai HSPK 45,529.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.008 O.H 130,000 1,040.00
1.10.28.02.01.001.002 Kepala Tukang 0.015 O.H 120,000 1,800.00
1.10.28.02.01.001.004 Tukang Kayu 0.150 O.H 110,000 16,500.00
1.10.28.02.01.002.001 Pekerja 0.015 O.H 90,000 1,350.00
Jumlah Harga Tenaga Kerja 20,690.00
Bahan
1.1.7.01.01.01.022.00383 Kait Angin 1.000 Buah 18,900 18,900.00
Jumlah Harga Bahan 18,900.00
Peralatan
Jumlah Harga Peralatan
Jumlah 39,590.00
Overhead & Profit 15 % 5,938.50

Nilai HSPK : 45,529.00


2.01.01.07.04.011 Pemasangan 1 Buah Door Closer Buah Nilai HSPK 266,731.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.003 O.H 130,000 390.00
1.10.28.02.01.001.002 Kepala Tukang 0.050 O.H 120,000 6,000.00
1.10.28.02.01.001.004 Tukang Kayu 0.500 O.H 110,000 55,000.00
1.10.28.02.01.002.001 Pekerja 0.050 O.H 90,000 4,500.00
Jumlah Harga Tenaga Kerja 65,890.00
Bahan
1.1.7.01.01.01.022.00384 Door Closer 1.000 Buah 166,050 166,050.00
Jumlah Harga Bahan 166,050.00
Peralatan
Jumlah Harga Peralatan
Jumlah 231,940.00
Overhead & Profit 15 % 34,791.00

Nilai HSPK : 266,731.00


2.01.01.07.04.012 Pemasangan 1 Buah Kunci Slot Buah Nilai HSPK 57,017.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.001 O.H 130,000 130.00
1.10.28.02.01.001.002 Kepala Tukang 0.020 O.H 120,000 2,400.00
1.10.28.02.01.001.004 Tukang Kayu 0.200 O.H 110,000 22,000.00
1.10.28.02.01.002.001 Pekerja 0.020 O.H 90,000 1,800.00
Jumlah Harga Tenaga Kerja 26,330.00
Bahan
1.1.7.01.01.01.022.00368 Kunci Selot 1.000 Buah 23,250 23,250.00
Jumlah Harga Bahan 23,250.00
Peralatan
Jumlah Harga Peralatan
Jumlah 49,580.00
Overhead & Profit 15 % 7,437.00

Nilai HSPK : 57,017.00


2.01.01.07.04.013 Pemasangan 1 Buah Door Holder Buah Nilai HSPK 109,181.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.003 O.H 130,000 390.00
1.10.28.02.01.001.002 Kepala Tukang 0.050 O.H 120,000 6,000.00
1.10.28.02.01.001.004 Tukang Kayu 0.500 O.H 110,000 55,000.00
1.10.28.02.01.002.001 Pekerja 0.050 O.H 90,000 4,500.00
Jumlah Harga Tenaga Kerja 65,890.00
Bahan

111
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
1.1.7.01.01.01.022.00386 Door Holder 1.000 Buah 29,050 29,050.00
Jumlah Harga Bahan 29,050.00
Peralatan
Jumlah Harga Peralatan
Jumlah 94,940.00
Overhead & Profit 15 % 14,241.00

Nilai HSPK : 109,181.00


2.01.01.07.04.014 Pemasangan 1 Buah Door Stopper Buah Nilai HSPK 44,850.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.005 O.H 130,000 650.00
1.10.28.02.01.001.002 Kepala Tukang 0.010 O.H 120,000 1,200.00
1.10.28.02.01.001.004 Tukang Kayu 0.100 O.H 110,000 11,000.00
1.10.28.02.01.002.001 Pekerja 0.010 O.H 90,000 900.00
Jumlah Harga Tenaga Kerja 13,750.00
Bahan
1.1.7.01.01.01.022.00385 Door Stop 1.000 Buah 25,250 25,250.00
Jumlah Harga Bahan 25,250.00
Peralatan
Jumlah Harga Peralatan
Jumlah 39,000.00
Overhead & Profit 15 % 5,850.00

Nilai HSPK : 44,850.00


2.01.01.07.04.015 Pekerjaan Pemasangan 1 Buah Rel Buah Nilai HSPK 533,186.00
Pintu Dorong (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.003 O.H 130,000 390.00
1.10.28.02.01.001.002 Kepala Tukang 0.060 O.H 120,000 7,200.00
1.10.28.02.01.001.004 Tukang Kayu 0.600 O.H 110,000 66,000.00
1.10.28.02.01.002.001 Pekerja 0.060 O.H 90,000 5,400.00
Jumlah Harga Tenaga Kerja 78,990.00
Bahan
1.1.7.01.01.01.022.00388 Rel Pintu Dorong 1.000 buah 384,650 384,650.00
Jumlah Harga Bahan 384,650.00
Peralatan
Jumlah Harga Peralatan
Jumlah 463,640.00
Overhead & Profit 15 % 69,546.00

Nilai HSPK : 533,186.00


2.01.01.07.04.016 Pemasangan 1 m2 Kaca Tebal 3 Mm m2 Nilai HSPK 149,883.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.0008 O.H 130,000 104.00
1.10.28.02.01.001.002 Kepala Tukang 0.015 O.H 120,000 1,800.00
1.10.28.02.01.001.004 Tukang Kayu 0.150 O.H 110,000 16,500.00
1.10.28.02.01.002.001 Pekerja 0.015 O.H 90,000 1,350.00
Jumlah Harga Tenaga Kerja 19,754.00
Bahan
1.1.7.01.01.01.003.00001 Kaca Polos Bening, 3 Mm 1.100 buah 98,700 108,570.00
1.1.7.01.01.01.022.00275 Lem Silicone Rubber Sealant 0.167 Kaleng 12,050 2,008.74
Jumlah Harga Bahan 110,578.74
Peralatan
Jumlah Harga Peralatan
Jumlah 130,332.74
Overhead & Profit 15 % 19,549.91

Nilai HSPK : 149,883.00


2.01.01.07.04.017 Pemasangan 1 m2 Kaca Tebal 5 Mm m2 Nilai HSPK 171,957.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.0008 O.H 130,000 104.00

112
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
1.10.28.02.01.001.002 Kepala Tukang 0.015 O.H 120,000 1,800.00
1.10.28.02.01.001.004 Tukang Kayu 0.150 O.H 110,000 16,500.00
1.10.28.02.01.002.001 Pekerja 0.015 O.H 90,000 1,350.00
Jumlah Harga Tenaga Kerja 19,754.00
Bahan
1.1.7.01.01.01.003.00002 Kaca Polos Bening, 5 Mm 1.100 buah 116,150 127,765.00
1.1.7.01.01.01.022.00275 Lem Silicone Rubber Sealant 0.167 Kaleng 12,050 2,008.74
Jumlah Harga Bahan 129,773.74
Peralatan
Jumlah Harga Peralatan
Jumlah 149,527.74
Overhead & Profit 15 % 22,429.16

Nilai HSPK : 171,957.00


2.01.01.07.04.018 Pemasangan 1 m2 Kaca Tebal 8 Mm m2 Nilai HSPK 264,017.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.0009 O.H 130,000 117.00
1.10.28.02.01.001.002 Kepala Tukang 0.017 O.H 120,000 2,040.00
1.10.28.02.01.001.004 Tukang Kayu 0.170 O.H 110,000 18,700.00
1.10.28.02.01.002.001 Pekerja 0.017 O.H 90,000 1,530.00
Jumlah Harga Tenaga Kerja 22,387.00
Bahan
1.1.7.01.01.01.003.00003 Kaca Polos Bening, 8 Mm 1.100 buah 185,800 204,380.00
1.1.7.01.01.01.022.00275 Lem Silicone Rubber Sealant 0.233 Kaleng 12,050 2,812.47
Jumlah Harga Bahan 207,192.47
Peralatan
Jumlah Harga Peralatan
Jumlah 229,579.47
Overhead & Profit 15 % 34,436.92

Nilai HSPK : 264,017.00


2.01.01.07.04.019 1 Buah Pemasangan Grendel Biasa Buah Nilai HSPK 48,128.00
(Besar) (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.004 Tukang Kayu 0.120 O.H 110,000 13,200.00
1.10.28.02.01.002.001 Pekerja 0.060 O.H 90,000 5,400.00
Jumlah Harga Tenaga Kerja 18,600.00
Bahan
1.1.7.01.01.01.022.00338 Grendel Pintu, Biasa (Besar) 1.000 Buah 23,250 23,250.00
Jumlah Harga Bahan 23,250.00
Peralatan
Jumlah Harga Peralatan
Jumlah 41,850.00
Overhead & Profit 15 % 6,277.50

Nilai HSPK : 48,128.00


2.01.01.07.05 Pengecatan
2.01.01.07.05.001 1 m2 Pekerjaan Mengerok Cat Lama m2 Nilai HSPK 16,115.00
Permukaan Kayu Secara Manual (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.003 O.H 130,000 390.00
1.10.28.02.01.002.001 Pekerja 0.150 O.H 90,000 13,500.00
Jumlah Harga Tenaga Kerja 13,890.00
Bahan
1.1.7.01.03.07.008.00029 Sabun Batangan 80 gram 0.050 Buah 2,450 122.50
Jumlah Harga Bahan 122.50
Peralatan
Jumlah Harga Peralatan
Jumlah 14,012.50
Overhead & Profit 15 % 2,101.88

Nilai HSPK : 16,115.00

113
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
2.01.01.07.05.002 1 m2 Pekerjaan Mendempul Dan m2 Nilai HSPK 14,531.00
Menggosok Kayu (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.003 O.H 130,000 325.00
1.10.28.02.01.001.002 Kepala Tukang 0.004 O.H 120,000 480.00
1.10.28.02.01.001.005 Tukang Cat 0.040 O.H 110,000 4,400.00
1.10.28.02.01.002.001 Pekerja 0.040 O.H 90,000 3,600.00
Jumlah Harga Tenaga Kerja 8,805.00
Bahan
1.1.7.01.01.01.006.00046 Dempul Kayu 0.080 Kg 41,800 3,344.00
1.1.7.01.01.01.006.00044 Minyak Cat Biasa 0.020 Liter 24,300 486.00
Jumlah Harga Bahan 3,830.00
Peralatan
Jumlah Harga Peralatan
Jumlah 12,635.00
Overhead & Profit 15 % 1,895.25

Nilai HSPK : 14,531.00


2.01.01.07.05.003 1 m2 Pekerjaan Pengecatan Bidang m2 Nilai HSPK 53,409.00
Kayu Lama (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.003 O.H 130,000 325.00
1.10.28.02.01.001.002 Kepala Tukang 0.008 O.H 120,000 900.00
1.10.28.02.01.001.005 Tukang Cat 0.075 O.H 110,000 8,250.00
1.10.28.02.01.002.001 Pekerja 0.070 O.H 90,000 6,300.00
Jumlah Harga Tenaga Kerja 15,775.00
Bahan
1.1.7.01.01.01.006.00036 Plamir Kayu 0.150 Kg 41,250 6,187.50
1.1.7.01.01.01.006.00013 Cat Kayu 0.170 Kg 72,000 12,240.00
1.1.7.01.01.01.006.00013 Cat Kayu 0.170 Kg 72,000 12,240.00
Jumlah Harga Bahan 30,667.50
Peralatan
Jumlah Harga Peralatan
Jumlah 46,442.50
Overhead & Profit 15 % 6,966.38

Nilai HSPK : 53,409.00


2.01.01.07.05.004 1 m2 Pekerjaan Pengecatan Bidang m2 Nilai HSPK 56,356.00
Kayu Baru (1 Lapis Plamir), 1 Lapis (dibulatkan) :
Cat Dasar 2 Lapis Cat Penutup

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.003 O.H 130,000 390.00
1.10.28.02.01.001.002 Kepala Tukang 0.006 O.H 120,000 720.00
1.10.28.02.01.001.005 Tukang Cat 0.009 O.H 110,000 990.00
1.10.28.02.01.002.001 Pekerja 0.070 O.H 90,000 6,300.00
Jumlah Harga Tenaga Kerja 8,400.00
Bahan
1.1.7.01.01.01.006.00006 Cat Meni Besi 0.200 Kg 37,200 7,440.00
1.1.7.01.01.01.006.00036 Plamir Kayu 0.150 Kg 41,250 6,187.50
1.1.7.01.01.01.022.00249 Kuas Cat 4inch. 0.010 Buah 17,050 170.50
1.1.7.01.01.01.006.00043 Thinner B 0.030 Kg 19,750 592.50
1.1.7.01.01.01.022.00224 Amplas Kasar 0.200 Lembar 5,850 1,170.00
1.1.7.01.01.01.006.00006 Cat Kayu Dasar 0.170 Kg 37,200 6,324.00
1.1.7.01.01.01.006.00013 Cat Kayu Penutup 2 Kali 0.260 Kg 72,000 18,720.00
Jumlah Harga Bahan 40,604.50
Peralatan
Jumlah Harga Peralatan
Jumlah 49,004.50
Overhead & Profit 15 % 7,350.68

Nilai HSPK : 56,356.00

114
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
2.01.01.07.05.005 1 m2 Pekerjaan Pengecatan Bidang m2 Nilai HSPK 75,676.00
Kayu Baru (1 Lapis Plamir), 1 Lapis (dibulatkan) :
Cat Dasar 3 Lapis Cat Penutup

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.003 O.H 130,000 390.00
1.10.28.02.01.001.002 Kepala Tukang 0.004 O.H 120,000 480.00
1.10.28.02.01.001.005 Tukang Cat 0.105 O.H 110,000 11,550.00
1.10.28.02.01.002.001 Pekerja 0.070 O.H 90,000 6,300.00
Jumlah Harga Tenaga Kerja 18,720.00
Bahan
1.1.7.01.01.01.006.00006 Cat Meni Besi 0.200 Kg 37,200 7,440.00
1.1.7.01.01.01.006.00036 Plamir Kayu 0.150 Kg 41,250 6,187.50
1.1.7.01.01.01.022.00249 Kuas Cat 4inch. 0.010 Buah 17,050 170.50
1.1.7.01.01.01.006.00043 Thinner B 0.030 Kg 19,750 592.50
1.1.7.01.01.01.022.00224 Amplas Kasar 0.200 Lembar 5,850 1,170.00
1.1.7.01.01.01.006.00006 Cat Kayu Dasar 0.170 Kg 37,200 6,324.00
1.1.7.01.01.01.006.00013 Cat Kayu Penutup 2 Kali 0.350 Kg 72,000 25,200.00
Jumlah Harga Bahan 47,084.50
Peralatan
Jumlah Harga Peralatan
Jumlah 65,804.50
Overhead & Profit 15 % 9,870.68

Nilai HSPK : 75,676.00


2.01.01.07.05.006 1 m2 Pekerjaan Pelaburan Bidang m2 Nilai HSPK 68,490.00
Kayu Dengan Pelitur (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.003 O.H 130,000 390.00
1.10.28.02.01.001.002 Kepala Tukang 0.016 O.H 120,000 1,920.00
1.10.28.02.01.001.005 Tukang Cat 0.060 O.H 110,000 6,600.00
1.10.28.02.01.002.001 Pekerja 0.040 O.H 90,000 3,600.00
Jumlah Harga Tenaga Kerja 12,510.00
Bahan
1.1.7.01.01.01.006.00049 Politur 0.150 Liter 54,600 8,190.00
1.1.7.01.01.01.006.00050 Politur Jadi 0.372 Liter 73,000 27,156.00
1.1.7.01.01.01.022.00224 Amplas Kasar 2.000 Lembar 5,850 11,700.00
Jumlah Harga Bahan 47,046.00
Peralatan
Jumlah Harga Peralatan
Jumlah 59,556.00
Overhead & Profit 15 % 8,933.40

Nilai HSPK : 68,490.00


2.01.01.07.05.007 1 m2 Pekerjaan Pelaburan Bidang m2 Nilai HSPK 32,278.00
Kayu Dengan Cat Residu Dan Ter (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.006 O.H 130,000 780.00
1.10.28.02.01.002.001 Pekerja 0.100 O.H 90,000 9,000.00
Jumlah Harga Tenaga Kerja 9,780.00
Bahan
1.1.7.01.01.01.006.00051 Teer 0.350 Liter 52,250 18,287.50
Jumlah Harga Bahan 18,287.50
Peralatan
Jumlah Harga Peralatan
Jumlah 28,067.50
Overhead & Profit 15 % 4,210.13

Nilai HSPK : 32,278.00


2.01.01.07.05.008 1 m2 Pekerjaan Pelaburan Bidang m2 Nilai HSPK 50,546.00
Kayu Dengan Vernis (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.003 O.H 130,000 390.00

115
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
1.10.28.02.01.001.002 Kepala Tukang 0.016 O.H 120,000 1,920.00
1.10.28.02.01.001.005 Tukang Cat 0.160 O.H 110,000 17,600.00
1.10.28.02.01.002.001 Pekerja 0.160 O.H 90,000 14,400.00
Jumlah Harga Tenaga Kerja 34,310.00
Bahan
1.1.7.01.01.01.006.00039 Vernis 0.150 Liter 46,450 6,967.50
1.1.7.01.01.01.006.00046 Dempul Kayu 0.050 Kg 41,800 2,090.00
1.1.7.01.01.01.022.00224 Amplas Kasar 0.100 Lembar 5,850 585.00
Jumlah Harga Bahan 9,642.50
Peralatan
Jumlah Harga Peralatan
Jumlah 43,952.50
Overhead & Profit 15 % 6,592.88

Nilai HSPK : 50,546.00


2.01.01.07.05.009 1 m2 Pekerjaan Mengikis/Mengerok m2 Nilai HSPK 17,644.00
Permukaan Cat Tembok Lama (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.003 O.H 130,000 390.00
1.10.28.02.01.002.001 Pekerja 0.150 O.H 90,000 13,500.00
Jumlah Harga Tenaga Kerja 13,890.00
Bahan
1.1.7.01.01.01.022.00472 Soda Api 0.050 Kg 29,050 1,452.50
Jumlah Harga Bahan 1,452.50
Peralatan
Jumlah Harga Peralatan
Jumlah 15,342.50
Overhead & Profit 15 % 2,301.38

Nilai HSPK : 17,644.00


2.01.01.07.05.010 1 m2 Pekerjaan Pencucian Bidang m2 Nilai HSPK 16,115.00
Permukaan Tembok Yang Pernah (dibulatkan) :
Dicat
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.003 O.H 130,000 390.00
1.10.28.02.01.002.001 Pekerja 0.150 O.H 90,000 13,500.00
Jumlah Harga Tenaga Kerja 13,890.00
Bahan
1.1.7.01.03.07.008.00029 Sabun Batangan Nuvo, family 80 0.050 Buah 2,450 122.50
gram
Jumlah Harga Bahan 122.50
Peralatan
Jumlah Harga Peralatan
Jumlah 14,012.50
Overhead & Profit 15 % 2,101.88

Nilai HSPK : 16,115.00


2.01.01.07.05.011 1 m2 Pekerjaan Mengapur Dinding m2 Nilai HSPK 6,569.00
Tembok Baru Sampai Baik 3 Kali (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.010 O.H 130,000 1,300.00
1.10.28.02.01.001.002 Kepala Tukang 0.001 O.H 120,000 120.00
1.10.28.02.01.001.005 Tukang Cat 0.007 O.H 110,000 770.00
1.10.28.02.01.002.001 Pekerja 0.039 O.H 90,000 3,510.00
Jumlah Harga Tenaga Kerja 5,700.00
Bahan
1.1.7.01.01.01.002.00011 Kapur Pasang 0.001 m3 11,650 11.65
Jumlah Harga Bahan 11.65
Peralatan
Jumlah Harga Peralatan
Jumlah 5,711.65

116
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Overhead & Profit 15 % 856.75

Nilai HSPK : 6,569.00


2.01.01.07.05.012 1 m2 Pekerjaan Mengapur Dinding m2 Nilai HSPK 2,845.00
Tembok Lama Sampai Baik 3 Kali (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.002 Kepala Tukang 0.000 O.H 120,000 48.00
1.10.28.02.01.001.005 Tukang Cat 0.018 O.H 110,000 1,980.00
1.10.28.02.01.001.006 Tukang Batu 0.004 O.H 110,000 440.00
Jumlah Harga Tenaga Kerja 2,468.00
Bahan
1.1.7.01.01.01.002.00011 Kapur Pasang 0.001 m3 11,650 5.83
Jumlah Harga Bahan 5.83
Peralatan
Jumlah Harga Peralatan
Jumlah 2,473.83
Overhead & Profit 15 % 371.07

Nilai HSPK : 2,845.00


2.01.01.07.05.013 1 m2 Pekerjaan Pengecatan Tembok m2 Nilai HSPK 18,180.00
Baru 1 Lapis Plamur, 1 Lapis Cat (dibulatkan) :
Dasar, 2 Lapis Cat Penutup Interior

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.003 O.H 130,000 390.00
1.10.28.02.01.001.002 Kepala Tukang 0.006 O.H 120,000 756.00
1.10.28.02.01.001.005 Tukang Cat 0.063 O.H 110,000 6,930.00
1.10.28.02.01.002.001 Pekerja 0.020 O.H 90,000 1,800.00
Jumlah Harga Tenaga Kerja 9,876.00
Bahan
1.1.7.01.01.01.006.00037 Plamur Tembok 0.100 Kg 17,450 1,745.00
1.1.7.01.01.01.006.00028 Cat Tembok Dasar (Alkali) 0.100 Kg 30,700 3,070.00
1.1.7.01.01.01.006.00015 Cat Tembok Paragon (5 Kg) 0.052 Galon 21,480 1,116.96
Jumlah Harga Bahan 5,931.96
Peralatan
Jumlah Harga Peralatan
Jumlah 15,807.96
Overhead & Profit 15 % 2,371.19

Nilai HSPK : 18,180.00


2.01.01.07.05.014 1 m2 Pekerjaan Pengecatan Tembok m2 Nilai HSPK 14,365.00
Lama 1 Lapis Plamur, 1 Lapis Cat (dibulatkan) :
Dasar, 2 Lapis Cat Penutup Interior

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.003 O.H 130,000 390.00
1.10.28.02.01.001.002 Kepala Tukang 0.004 O.H 120,000 504.00
1.10.28.02.01.001.005 Tukang Cat 0.042 O.H 110,000 4,620.00
1.10.28.02.01.002.001 Pekerja 0.028 O.H 90,000 2,520.00
Jumlah Harga Tenaga Kerja 8,034.00
Bahan
1.1.7.01.01.01.006.00028 Cat Tembok Dasar (Alkali) 0.120 Kg 30,700 3,684.00
1.1.7.01.01.01.006.00015 Cat Tembok Paragon (5 Kg) 0.036 Galon 21,480 773.28
Jumlah Harga Bahan 4,457.28
Peralatan
Jumlah Harga Peralatan
Jumlah 12,491.28
Overhead & Profit 15 % 1,873.69

Nilai HSPK : 14,365.00


2.01.01.07.05.015 1 M2 Pengecatan Tembok Exterior m2 Nilai HSPK 73,491.00
(dibulatkan) :
Tenaga Kerja

117
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
1.10.28.02.01.002.001 Pekerja 0.200 O.H 90,000 18,000.00
1.10.28.02.01.001.005 Tukang Cat 0.300 O.H 110,000 33,000.00
Jumlah Harga Tenaga Kerja 51,000.00
Bahan
1.1.7.01.01.01.006.00021 Cat Tembok Eksterior, Dulux 0.040 Galon 117,980 4,719.20
Weather, Setara Shield, 2,5 liter
1.1.7.01.01.01.006.00028 Cat Tembok Dasar (Alkali) 0.160 Kg 30,700 4,912.00
1.1.7.01.01.01.022.00224 Amplas Kasar 0.500 Lembar 5,850 2,925.00
1.1.7.01.01.01.022.00244 Kuas Roll Imunndex, Besar 0.010 bh 34,850 348.50
Jumlah Harga Bahan 12,904.70
Peralatan
Jumlah Harga Peralatan
Jumlah 63,904.70
Overhead & Profit 15 % 9,585.71

Nilai HSPK : 73,491.00


2.01.01.07.05.016 1 m2 Pekerjaan Pengerokan Karat m2 Nilai HSPK 16,862.00
Pada Permukaan Baja Secara (dibulatkan) :
Manual
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.008 O.H 130,000 1,040.00
1.10.28.02.01.002.001 Pekerja 0.150 O.H 90,000 13,500.00
Jumlah Harga Tenaga Kerja 14,540.00
Bahan
1.1.7.01.03.07.008.00029 Sabun Batangan Nuvo, family 80 0.050 Buah 2,450 122.50
gram
Jumlah Harga Bahan 122.50
Peralatan
Jumlah Harga Peralatan
Jumlah 14,662.50
Overhead & Profit 15 % 2,199.38

Nilai HSPK : 16,862.00


2.01.01.07.05.017 1 m2 Pekerjaan Pengecatan m2 Nilai HSPK 34,978.00
Permukaan Baja Dengan Cat Meni (dibulatkan) :
Besi
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.0025 O.H 130,000 325.00
1.10.28.02.01.001.002 Kepala Tukang 0.020 O.H 120,000 2,400.00
1.10.28.02.01.001.005 Tukang Cat 0.200 O.H 110,000 22,000.00
1.10.28.02.01.002.001 Pekerja 0.020 O.H 90,000 1,800.00
Jumlah Harga Tenaga Kerja 26,525.00
Bahan
1.1.7.01.01.01.006.00006 Cat Meni Besi 0.100 Kg 37,200 3,720.00
1.1.7.01.01.01.022.00249 Kuas Cat 4inch. 0.010 Buah 17,050 170.50
Jumlah Harga Bahan 3,890.50
Peralatan
Jumlah Harga Peralatan
Jumlah 30,415.50
Overhead & Profit 15 % 4,562.33

Nilai HSPK : 34,978.00


2.01.01.07.05.018 1 m2 Pekerjaan Pengecatan m2 Nilai HSPK 71,933.00
Permukaan Baja Dengan Cat Meni (dibulatkan) :
Besi Dan Perancah
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.0075 O.H 130,000 975.00
1.10.28.02.01.001.002 Kepala Tukang 0.0225 O.H 120,000 2,700.00
1.10.28.02.01.001.005 Tukang Cat 0.225 O.H 110,000 24,750.00
1.10.28.02.01.002.001 Pekerja 0.250 O.H 90,000 22,500.00
Jumlah Harga Tenaga Kerja 50,925.00
Bahan
1.1.7.01.01.01.006.00006 Cat Meni Besi 0.100 Kg 37,200 3,720.00
1.1.7.01.01.01.006.00043 Thinner B 0.010 Liter 19,750 197.50

118
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
1.1.7.01.01.01.022.00249 Kuas Cat 4inch. 0.010 Buah 17,050 170.50
1.1.7.01.01.05.002.00043 Kayu Perancah 0.002 m3 3,768,400 7,536.80
Jumlah Harga Bahan 11,624.80
Peralatan
Jumlah Harga Peralatan
Jumlah 62,549.80
Overhead & Profit 15 % 9,382.47

Nilai HSPK : 71,933.00


2.01.01.07.05.019 1 m2 Pekerjaan Pengecatan m2 Nilai HSPK 74,994.00
Permukaan Baja Galvanis Secara (dibulatkan) :
Manual 4 Lapis
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.0013 O.H 130,000 169.00
1.10.28.02.01.001.002 Kepala Tukang 0.025 O.H 120,000 3,000.00
1.10.28.02.01.001.005 Tukang Cat 0.250 O.H 110,000 27,500.00
1.10.28.02.01.002.001 Pekerja 0.250 O.H 90,000 22,500.00
Jumlah Harga Tenaga Kerja 53,169.00
Bahan
1.1.7.01.01.01.006.00033 Meni A 0.100 Kg 37,750 3,775.00
1.1.7.01.01.01.006.00034 Meni B 0.100 Kg 18,600 1,860.00
1.1.7.01.01.01.006.00005 Cat Besi 0.080 Kg 75,500 6,040.00
1.1.7.01.01.01.022.00249 Kuas Cat 4inch. 0.010 Buah 17,050 170.50
1.1.7.01.01.01.006.00043 Thinner B 0.010 Liter 19,750 197.50
Jumlah Harga Bahan 12,043.00
Peralatan
Jumlah Harga Peralatan
Jumlah 65,212.00
Overhead & Profit 15 % 9,781.80

Nilai HSPK : 74,994.00


2.01.01.07.05.020 1 m2 Pekerjaan Pengecatan m2 Nilai HSPK 184,048.00
Permukaan Baja Galvanis Secara (dibulatkan) :
Manual 3 Lapis
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.020 O.H 130,000 2,600.00
1.10.28.02.01.001.002 Kepala Tukang 0.080 O.H 120,000 9,600.00
1.10.28.02.01.001.005 Tukang Cat 0.800 O.H 110,000 88,000.00
1.10.28.02.01.002.001 Pekerja 0.400 O.H 90,000 36,000.00
Jumlah Harga Tenaga Kerja 136,200.00
Bahan
1.1.7.01.01.01.006.00032 Meni Zincromate Altex, 1 Kg 0.110 Kg 41,800 4,598.00
1.1.7.01.01.01.006.00001 Cat Besi Warna Hitam 0.170 Kg 75,500 12,835.00
1.1.7.01.01.01.006.00005 Cat Besi 0.080 Kg 75,500 6,040.00
1.1.7.01.01.01.022.00249 Kuas Cat 4inch. 0.010 Buah 17,050 170.50
1.1.7.01.01.01.006.00043 Thinner B 0.010 Liter 19,750 197.50
Jumlah Harga Bahan 23,841.00
Peralatan
Jumlah Harga Peralatan
Jumlah 160,041.00
Overhead & Profit 15 % 24,006.15

Nilai HSPK : 184,048.00


2.01.01.07.05.021 1 m2 Pekerjaan Pengecatan m2 Nilai HSPK 42,376.00
Permukaan Baja Galvanis Secara (dibulatkan) :
Manual 1 Lapis Mutakhir

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.003 O.H 130,000 390.00
1.10.28.02.01.001.002 Kepala Tukang 0.012 O.H 120,000 1,440.00
1.10.28.02.01.001.005 Tukang Cat 0.060 O.H 110,000 6,600.00
1.10.28.02.01.002.001 Pekerja 0.060 O.H 90,000 5,400.00
Jumlah Harga Tenaga Kerja 13,830.00
Bahan

119
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
1.1.7.01.01.01.006.00005 Cat Besi 0.300 Kg 75,500 22,650.00
1.1.7.01.01.01.022.00249 Kuas Cat 4inch. 0.010 Buah 17,050 170.50
1.1.7.01.01.01.006.00043 Thinner B 0.010 Liter 19,750 197.50
Jumlah Harga Bahan 23,018.00
Peralatan
Jumlah Harga Peralatan
Jumlah 36,848.00
Overhead & Profit 15 % 5,527.20

Nilai HSPK : 42,376.00


2.01.01.07.05.022 1 m2 Pekerjaan Pengecatan m2 Nilai HSPK 182,344.00
Permukaan Baja Galvanis Secara (dibulatkan) :
Semprot Dengan Sistem 3 Lapis Cat
Mutakhir
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.200 O.H 130,000 26,000.00
1.10.28.02.01.001.002 Kepala Tukang 0.070 O.H 120,000 8,400.00
1.10.28.02.01.001.005 Tukang Cat 0.700 O.H 110,000 77,000.00
1.10.28.02.01.002.001 Pekerja 0.400 O.H 90,000 36,000.00
Jumlah Harga Tenaga Kerja 147,400.00
Bahan
1.1.7.01.01.01.006.00006 Cat Meni Besi 0.300 Kg 37,200 11,160.00
Jumlah Harga Bahan 11,160.00
Peralatan
Jumlah Harga Peralatan
Jumlah 158,560.00
Overhead & Profit 15 % 23,784.00

Nilai HSPK : 182,344.00


2.01.01.07.05.023 1 m2 Pekerjaan Pengecatan Plafond m2 Nilai HSPK 26,107.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.004 O.H 130,000 520.00
1.10.28.02.01.001.002 Kepala Tukang 0.006 O.H 120,000 720.00
1.10.28.02.01.001.005 Tukang Cat 0.060 O.H 110,000 6,600.00
1.10.28.02.01.002.001 Pekerja 0.080 O.H 90,000 7,200.00
Jumlah Harga Tenaga Kerja 15,040.00
Bahan
1.1.7.01.01.01.022.00230 Kapi Cat Rrt 2inch. 0.050 Buah 9,300 465.00
1.1.7.01.01.01.006.00028 Cat Tembok Dasar (Alkali) 0.100 Kg 30,700 3,070.00
1.1.7.01.01.01.006.00015 Cat Tembok Paragon (5 Kg) 0.048 Galon 21,480 1,031.04
1.1.7.01.01.01.022.00224 Amplas Kasar 0.500 Lembar 5,850 2,925.00
1.1.7.01.01.01.022.00249 Kuas Cat 4inch. 0.010 Buah 17,050 170.50
Jumlah Harga Bahan 7,661.54
Peralatan
Jumlah Harga Peralatan
Jumlah 22,701.54
Overhead & Profit 15 % 3,405.23

Nilai HSPK : 26,107.00


2.01.01.07.06 Instalasi Listrik
2.01.01.07.06.001 Pemasangan 1 Titik Stop Kontak Titik Nilai HSPK 183,816.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.002 Kepala Tukang 0.005 O.H 120,000 600.00
1.10.28.02.01.001.004 Tukang Listrik 0.500 O.H 110,000 55,000.00
1.10.28.02.01.002.001 Pekerja 0.050 O.H 90,000 4,500.00
Jumlah Harga Tenaga Kerja 60,100.00
Bahan
1.1.7.01.03.08.001.00005 Kabel NYA Supreme, 1 x 2.5 mm 15.000 m' 5,050 75,750.00
1.1.7.02.02.06.001.00069 Pipa PVC Maspion, C 5/8inch. x 4 cm 0.200 Batang 8,700 1,740.00

1.1.7.01.03.08.003.00005 Stop Kontak Broco, Tunggal 1.000 Buah 17,100 17,100.00


1.1.7.01.03.08.012.00016 T dos PVC SB 1.000 Buah 5,150 5,150.00

120
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Jumlah Harga Bahan 99,740.00
Peralatan
Jumlah Harga Peralatan
Jumlah 159,840.00
Overhead & Profit 15 % 23,976.00

Nilai HSPK : 183,816.00


2.01.01.07.06.002 Pemasangan 1 Titik Lampu Titik Nilai HSPK 230,460.00
(Menggunakan Kabel Nya) (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.002 Kepala Tukang 0.050 O.H 120,000 6,000.00
1.10.28.02.01.001.004 Tukang Listrik 0.500 O.H 110,000 55,000.00
1.10.28.02.01.002.001 Pekerja 0.300 O.H 90,000 27,000.00
Jumlah Harga Tenaga Kerja 88,000.00
Bahan
1.1.7.01.03.08.001.00005 Kabel NYA Supreme, 1 x 2.5 mm 15.000 m' 5,050 75,750.00
1.1.7.02.02.06.001.00069 Pipa PVC Maspion, C 5/8inch. x 4 cm 1.000 Batang 8,700 8,700.00

1.1.7.01.03.08.003.00005 Stop Kontak Broco, Tunggal 1.000 Buah 17,100 17,100.00


1.1.7.01.03.08.008.00004 Fitting Broco, Plafon 1.000 Buah 5,700 5,700.00
1.1.7.01.03.08.012.00016 T dos PVC SB 1.000 Buah 5,150 5,150.00
Jumlah Harga Bahan 112,400.00
Peralatan
Jumlah Harga Peralatan
Jumlah 200,400.00
Overhead & Profit 15 % 30,060.00

Nilai HSPK : 230,460.00


2.01.01.07.06.003 Pemasangan 1 Titik Lampu Titik Nilai HSPK 297,218.00
(Menggunakan Kabel Nym) (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.002 Kepala Tukang 0.050 O.H 120,000 6,000.00
1.10.28.02.01.001.004 Tukang Listrik 0.500 O.H 110,000 55,000.00
1.10.28.02.01.002.001 Pekerja 0.300 O.H 90,000 27,000.00
Jumlah Harga Tenaga Kerja 88,000.00
Bahan
1.1.7.01.03.08.004.00004 Saklar Broco, Tunggal 1.000 Buah 17,400 17,400.00
1.1.7.01.03.08.001.00009 Kabel NYM Supreme, 2 x 2.5 mm 7.500 m' 17,800 133,500.00

1.1.7.02.02.06.001.00069 Pipa PVC Maspion, C 5/8inch. x 4 cm 1.000 Batang 8,700 8,700.00

1.1.7.01.03.08.012.00016 T dos PVC SB 1.000 Buah 5,150 5,150.00


1.1.7.01.03.08.008.00004 Fitting Broco, Plafon 1.000 Buah 5,700 5,700.00
Jumlah Harga Bahan 170,450.00
Peralatan
Jumlah Harga Peralatan
Jumlah 258,450.00
Overhead & Profit 15 % 38,767.50

Nilai HSPK : 297,218.00


2.01.01.07.06.004 Pekerjaan Pemasangan Saklar Titik Nilai HSPK 52,314.00
Tunggal Per Titik (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.002 Kepala Tukang 0.050 O.H 120,000 6,000.00
1.10.28.02.01.001.004 Tukang Listrik 0.200 O.H 110,000 22,000.00
1.10.28.02.01.002.001 Pekerja 0.001 O.H 90,000 90.00
Jumlah Harga Tenaga Kerja 28,090.00
Bahan
1.1.7.01.03.08.004.00004 Saklar Broco, Tunggal 1.000 Buah 17,400 17,400.00
Jumlah Harga Bahan 17,400.00
Peralatan
Jumlah Harga Peralatan
Jumlah 45,490.00
Overhead & Profit 15 % 6,823.50

121
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f

Nilai HSPK : 52,314.00


2.01.01.07.06.005 Pekerjaan Pemasangan Saklar Ganda Titik Nilai HSPK 57,489.00
Per Titik (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.002 Kepala Tukang 0.050 O.H 120,000 6,000.00
1.10.28.02.01.001.004 Tukang Listrik 0.200 O.H 110,000 22,000.00
1.10.28.02.01.002.001 Pekerja 0.001 O.H 90,000 90.00
Jumlah Harga Tenaga Kerja 28,090.00
Bahan
1.1.7.01.03.08.004.00001 Saklar Broco, Ganda 1.000 Buah 21,900 21,900.00
Jumlah Harga Bahan 21,900.00
Peralatan
Jumlah Harga Peralatan
Jumlah 49,990.00
Overhead & Profit 15 % 7,498.50

Nilai HSPK : 57,489.00


2.01.01.07.06.006 1 Unit Pemasangan Lampu 1 x 18 Buah Nilai HSPK 259,095.00
Watt (Lengkap) (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.002 Kepala Tukang 0.005 O.H 120,000 600.00
1.10.28.02.01.001.004 Tukang Listrik 0.020 O.H 110,000 2,200.00
1.10.28.02.01.002.001 Pekerja 0.010 O.H 90,000 900.00
Jumlah Harga Tenaga Kerja 3,700.00
Bahan
1.1.7.01.03.08.002.00045 Lampu Tl 1 x 18 Watt 1.000 Set 221,600 221,600.00
Jumlah Harga Bahan 221,600.00
Peralatan
Jumlah Harga Peralatan
Jumlah 225,300.00
Overhead & Profit 15 % 33,795.00

Nilai HSPK : 259,095.00


2.01.01.07.06.007 1 Unit Pemasangan Lampu 1 x 36 Buah Nilai HSPK 388,930.00
Watt (Lengkap) (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.002 Kepala Tukang 0.005 O.H 120,000 600.00
1.10.28.02.01.001.004 Tukang Listrik 0.020 O.H 110,000 2,200.00
1.10.28.02.01.002.001 Pekerja 0.010 O.H 90,000 900.00
Jumlah Harga Tenaga Kerja 3,700.00
Bahan
1.1.7.01.03.08.002.00046 Lampu Tl 1 x 36 Watt 1.000 Set 334,500 334,500.00
Jumlah Harga Bahan 334,500.00
Peralatan
Jumlah Harga Peralatan
Jumlah 338,200.00
Overhead & Profit 15 % 50,730.00

Nilai HSPK : 388,930.00


2.01.01.07.06.008 1 Buah Pemasangan Lampu Sl 18 Buah Nilai HSPK 55,085.00
Watt (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.002 Kepala Tukang 0.005 O.H 120,000 600.00
1.10.28.02.01.001.004 Tukang Listrik 0.020 O.H 110,000 2,200.00
1.10.28.02.01.002.001 Pekerja 0.010 O.H 90,000 900.00
Jumlah Harga Tenaga Kerja 3,700.00
Bahan
1.1.7.01.03.08.002.00011 Lampu Essential Philips, 18 Watt 1.000 Buah 44,200 44,200.00
Jumlah Harga Bahan 44,200.00
Peralatan
Jumlah Harga Peralatan
Jumlah 47,900.00
Overhead & Profit 15 % 7,185.00

122
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f

Nilai HSPK : 55,085.00


2.01.01.07.06.009 1 Buah Pemasangan Lampu Sl 23 Buah Nilai HSPK 63,365.00
Watt (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.002 Kepala Tukang 0.005 O.H 120,000 600.00
1.10.28.02.01.001.004 Tukang Listrik 0.020 O.H 110,000 2,200.00
1.10.28.02.01.002.001 Pekerja 0.010 O.H 90,000 900.00
Jumlah Harga Tenaga Kerja 3,700.00
Bahan
1.1.7.01.03.08.002.00012 Lampu Essential Philips, 23 Watt 1.000 Buah 51,400 51,400.00
Jumlah Harga Bahan 51,400.00
Peralatan
Jumlah Harga Peralatan
Jumlah 55,100.00
Overhead & Profit 15 % 8,265.00

Nilai HSPK : 63,365.00


2.01.01.07.06.010 1 Buah Pemasangan Lampu Pijar 25 Buah Nilai HSPK 17,480.00
Watt (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.002 Kepala Tukang 0.005 O.H 120,000 600.00
1.10.28.02.01.001.004 Tukang Listrik 0.020 O.H 110,000 2,200.00
1.10.28.02.01.002.001 Pekerja 0.010 O.H 90,000 900.00
Jumlah Harga Tenaga Kerja 3,700.00
Bahan
1.1.7.01.03.08.002.00028 Lampu Pijar 25 Watt 1.000 Buah 11,500 11,500.00
Jumlah Harga Bahan 11,500.00
Peralatan
Jumlah Harga Peralatan
Jumlah 15,200.00
Overhead & Profit 15 % 2,280.00

Nilai HSPK : 17,480.00


2.01.01.07.06.011 1 Buah Pemasangan Lampu Down Buah Nilai HSPK 138,460.00
Light + Fitting (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.002 Kepala Tukang 0.005 O.H 120,000 600.00
1.10.28.02.01.001.004 Tukang Listrik 0.020 O.H 110,000 2,200.00
1.10.28.02.01.002.001 Pekerja 0.010 O.H 90,000 900.00
Jumlah Harga Tenaga Kerja 3,700.00
Bahan
1.3.2.18.01.01.003.00203 Lampu Down Light + Fitting 1.000 Buah 116,700 116,700.00
Jumlah Harga Bahan 116,700.00
Peralatan
Jumlah Harga Peralatan
Jumlah 120,400.00
Overhead & Profit 15 % 18,060.00

Nilai HSPK : 138,460.00


2.01.01.07.06.012 1 Titik Pemasangan Box Panel Titik Nilai HSPK 1,136,085.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.002 Kepala Tukang 1.000 O.H 120,000 120,000.00
1.10.28.02.01.001.004 Tukang Listrik 1.000 O.H 110,000 110,000.00
1.10.28.02.01.002.001 Pekerja 0.500 O.H 90,000 45,000.00
Jumlah Harga Tenaga Kerja 275,000.00
Bahan
1.3.2.18.01.01.003.00008 Box Panel Box Panel MCB / Trafo 1.000 bh 356,500 356,500.00

1.3.2.18.01.01.003.00036 MCB Schneider, MG Domae, 1 Phase 2.000 bh 50,600 101,200.00


4.5 kA, 6 A
1.3.2.18.01.01.003.00035 MCB Schneider, MG Domae, 1 Phase 2.000 bh 57,700 115,400.00
4.5 kA, 4 A

123
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
1.1.7.01.03.08.001.00010 Kabel NYM Supreme, 3 x 2,5 mm 6.000 m 23,300 139,800.00

Jumlah Harga Bahan 712,900.00


Peralatan
Jumlah Harga Peralatan
Jumlah 987,900.00
Overhead & Profit 15 % 148,185.00

Nilai HSPK : 1,136,085.00


2.01.01.07.06.013 1 Titik Pasangan Instalasi antena TV Titik Nilai HSPK 500,680.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.100 O.H 130,000 13,000.00
1.10.28.02.01.001.002 Kepala Tukang 0.100 O.H 120,000 12,000.00
1.10.28.02.01.001.004 Tukang Listrik 0.020 O.H 110,000 2,200.00
1.10.28.02.01.002.001 Pekerja 0.050 O.H 90,000 4,500.00
Jumlah Harga Tenaga Kerja 31,700.00
Bahan
1.1.7.01.03.08.001.00041 Kabel Antena 10.000 roll 39,800 398,000.00
1.1.7.01.03.08.012.00011 Isolasi Nachi, 7 mils x 3/4inch. x 20 0.500 bh 10,300 5,150.00
m
1.1.7.01.01.01.022.00473 Klem 3x40x450 mm 0.030 bh 17,450 523.50
Jumlah Harga Bahan 403,673.50
Peralatan
Jumlah Harga Peralatan
Jumlah 435,373.50
Overhead & Profit 15 % 65,306.03

Nilai HSPK : 500,680.00


2.01.02.01 H. PAVING & PERKERASAN JALAN

2.01.02.01.01 Perkerasan Paving


2.01.02.01.01.001 1 m2 Pemasangan Tegel Trotoar m2 Nilai HSPK 180,399.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.025 O.H 130,000 3,250.00
1.10.28.02.01.001.002 Kepala Tukang 0.025 O.H 120,000 3,000.00
1.10.28.02.01.001.006 Tukang Batu 0.250 O.H 110,000 27,500.00
1.10.28.02.01.002.001 Pekerja 0.500 O.H 90,000 45,000.00
Jumlah Harga Tenaga Kerja 78,750.00
Bahan
1.1.7.01.01.01.004.00002 Pasir Pasang 0.010 m3 232,250 2,322.50
1.1.7.01.01.01.002.00001 Semen Portland 4.560 Kg 1,306 5,956.07
1.1.7.01.01.01.002.00011 Kapur Pasang 0.012 m3 11,650 139.80
1.1.7.01.01.01.013.00042 Tegel Trotoar 1.000 m2 69,700 69,700.00
Jumlah Harga Bahan 78,118.37
Peralatan
Jumlah Harga Peralatan
Jumlah 156,868.37
Overhead & Profit 15 % 23,530.26

Nilai HSPK : 180,399.00


2.01.02.01.01.002 1 m2 Pekerjaan Pemasangan Paving m2 Nilai HSPK 229,972.00
Stone Tebal 8 Cm Abu-Abu Segi (dibulatkan) :
Enam (K-300)
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.013 O.H 130,000 1,625.00
1.10.28.02.01.001.002 Kepala Tukang 0.013 O.H 120,000 1,500.00
1.10.28.02.01.001.006 Tukang Batu 0.250 O.H 110,000 27,500.00
1.10.28.02.01.002.001 Pekerja 0.750 O.H 90,000 67,500.00
Jumlah Harga Tenaga Kerja 98,125.00
Bahan
1.1.7.01.01.01.022.00302 Paving Stone Segi Enam, Tebal. 8 cm, 1.000 m2 101,850 101,850.00
Abu-Abu (K 300)

124
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Jumlah Harga Bahan 101,850.00
Peralatan
Jumlah Harga Peralatan
Jumlah 199,975.00
Overhead & Profit 15 % 29,996.25

Nilai HSPK : 229,972.00


2.01.02.01.01.003 1 m2 Pekerjaan Pemasangan Paving m2 Nilai HSPK 213,814.00
Stone Tebal 8 Cm Bewarna Segi (dibulatkan) :
Enam (K-300)
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.013 O.H 130,000 1,625.00
1.10.28.02.01.001.002 Kepala Tukang 0.013 O.H 120,000 1,500.00
1.10.28.02.01.001.006 Tukang Batu 0.250 O.H 110,000 27,500.00
1.10.28.02.01.002.001 Pekerja 0.500 O.H 90,000 45,000.00
Jumlah Harga Tenaga Kerja 75,625.00
Bahan
1.1.7.01.01.01.022.00301 Paving Stone Segi Enam, Tebal. 6 cm, 1.000 m2 110,300 110,300.00
Berwarna (K 300)
Jumlah Harga Bahan 110,300.00
Peralatan
Jumlah Harga Peralatan
Jumlah 185,925.00
Overhead & Profit 15 % 27,888.75

Nilai HSPK : 213,814.00


2.01.02.01.01.004 1 m2 Pekerjaan Pemasangan Paving m2 Nilai HSPK 204,097.00
Stone Tebal 8 Cm Abu - Abu Persegi (dibulatkan) :
Panjang (K - 300)

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.013 O.H 130,000 1,625.00
1.10.28.02.01.001.002 Kepala Tukang 0.013 O.H 120,000 1,500.00
1.10.28.02.01.001.006 Tukang Batu 0.250 O.H 110,000 27,500.00
1.10.28.02.01.002.001 Pekerja 0.500 O.H 90,000 45,000.00
Jumlah Harga Tenaga Kerja 75,625.00
Bahan
1.1.7.01.01.01.022.00296 Paving Stone Bata, Tebal. 8 cm, Abu- 1.000 m2 101,850 101,850.00
Abu (K 300)
Jumlah Harga Bahan 101,850.00
Peralatan
Jumlah Harga Peralatan
Jumlah 177,475.00
Overhead & Profit 15 % 26,621.25

Nilai HSPK : 204,097.00


2.01.02.01.01.005 1 m2 Pekerjaan Pemasangan Paving m2 Nilai HSPK 204,097.00
Stone Tebal 8 Cm Bewarna Persegi (dibulatkan) :
Panjang (K-300)

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.013 O.H 130,000 1,625.00
1.10.28.02.01.001.002 Kepala Tukang 0.013 O.H 120,000 1,500.00
1.10.28.02.01.001.006 Tukang Batu 0.250 O.H 110,000 27,500.00
1.10.28.02.01.002.001 Pekerja 0.500 O.H 90,000 45,000.00
Jumlah Harga Tenaga Kerja 75,625.00
Bahan
1.1.7.01.01.01.022.00295 Paving Stone Bata, Tebal. 6 cm, 1.000 m2 101,850 101,850.00
Berwarna (K 300)
Jumlah Harga Bahan 101,850.00
Peralatan
Jumlah Harga Peralatan
Jumlah 177,475.00
Overhead & Profit 15 % 26,621.25

125
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f

Nilai HSPK : 204,097.00


2.01.02.01.01.006 1 m2 Pekerjaan Pemasangan Paving m2 Nilai HSPK 198,117.00
Stone Tebal 6 Cm Abu-Abu Segi (dibulatkan) :
Enam (K-300)
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.013 O.H 130,000 1,625.00
1.10.28.02.01.001.002 Kepala Tukang 0.013 O.H 120,000 1,500.00
1.10.28.02.01.001.006 Tukang Batu 0.250 O.H 110,000 27,500.00
1.10.28.02.01.002.001 Pekerja 0.500 O.H 90,000 45,000.00
Jumlah Harga Tenaga Kerja 75,625.00
Bahan
1.1.7.01.01.01.022.00300 Paving Stone Segi Enam, Tebal. 6 cm, 1.000 m2 96,650 96,650.00
Abu-Abu (K 300)
Jumlah Harga Bahan 96,650.00
Peralatan
Jumlah Harga Peralatan
Jumlah 172,275.00
Overhead & Profit 15 % 25,841.25

Nilai HSPK : 198,117.00


2.01.02.01.01.007 1 m2 Pekerjaan Pemasangan Paving m2 Nilai HSPK 213,814.00
Stone Tebal 6 Cm Bewarna Segi (dibulatkan) :
Enam (K-300)
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.013 O.H 130,000 1,625.00
1.10.28.02.01.001.002 Kepala Tukang 0.013 O.H 120,000 1,500.00
1.10.28.02.01.001.006 Tukang Batu 0.250 O.H 110,000 27,500.00
1.10.28.02.01.002.001 Pekerja 0.500 O.H 90,000 45,000.00
Jumlah Harga Tenaga Kerja 75,625.00
Bahan
1.1.7.01.01.01.022.00301 Paving Stone Segi Enam, Tebal. 6 cm, 1.000 m2 110,300 110,300.00
Berwarna (K 300)
Jumlah Harga Bahan 110,300.00
Peralatan
Jumlah Harga Peralatan
Jumlah 185,925.00
Overhead & Profit 15 % 27,888.75

Nilai HSPK : 213,814.00


2.01.02.01.01.008 1 m2 Pekerjaan Pemasangan Paving m2 Nilai HSPK 190,354.00
Stone Tebal 6 Cm Abu - Abu Persegi (dibulatkan) :
Panjang (K-300)

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.013 O.H 130,000 1,625.00
1.10.28.02.01.001.002 Kepala Tukang 0.013 O.H 120,000 1,500.00
1.10.28.02.01.001.006 Tukang Batu 0.250 O.H 110,000 27,500.00
1.10.28.02.01.002.001 Pekerja 0.500 O.H 90,000 45,000.00
Jumlah Harga Tenaga Kerja 75,625.00
Bahan
1.1.7.01.01.01.022.00294 Paving Stone Bata, Tebal. 6 cm, Abu- 1.000 m2 89,900 89,900.00
Abu (K 300)
Jumlah Harga Bahan 89,900.00
Peralatan
Jumlah Harga Peralatan
Jumlah 165,525.00
Overhead & Profit 15 % 24,828.75

Nilai HSPK : 190,354.00


2.01.02.01.01.009 1 m2 Pekerjaan Pemasangan Paving m2 Nilai HSPK 204,097.00
Stone Tebal 6 Cm Bewarna Persegi (dibulatkan) :
Panjang (K-300)

126
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.013 O.H 130,000 1,625.00
1.10.28.02.01.001.002 Kepala Tukang 0.013 O.H 120,000 1,500.00
1.10.28.02.01.001.006 Tukang Batu 0.250 O.H 110,000 27,500.00
1.10.28.02.01.002.001 Pekerja 0.500 O.H 90,000 45,000.00
Jumlah Harga Tenaga Kerja 75,625.00
Bahan
1.1.7.01.01.01.022.00295 Paving Stone Bata, Tebal. 6 cm, 1.000 m2 101,850 101,850.00
Berwarna (K 300)
Jumlah Harga Bahan 101,850.00
Peralatan
Jumlah Harga Peralatan
Jumlah 177,475.00
Overhead & Profit 15 % 26,621.25

Nilai HSPK : 204,097.00


2.01.02.01.01.010 1 m2 Pekerjaan Pemasangan Paving m2 Nilai HSPK 153,784.00
Stone Tebal 6 Cm Abu - Abu Persegi (dibulatkan) :
Panjang (K-175) Untuk Jalan
Lingkungan Hidup

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.013 O.H 130,000 1,625.00
1.10.28.02.01.001.002 Kepala Tukang 0.013 O.H 120,000 1,500.00
1.10.28.02.01.001.006 Tukang Batu 0.250 O.H 110,000 27,500.00
1.10.28.02.01.002.001 Pekerja 0.500 O.H 90,000 45,000.00
Jumlah Harga Tenaga Kerja 75,625.00
Bahan
1.1.7.01.01.01.022.00298 Paving Stone Persegi, Tebal. 6 cm, 1.000 m2 58,100 58,100.00
Abu-Abu (K 175)
Jumlah Harga Bahan 58,100.00
Peralatan
Jumlah Harga Peralatan
Jumlah 133,725.00
Overhead & Profit 15 % 20,058.75

Nilai HSPK : 153,784.00


2.01.02.01.01.011 1 m2 Pekerjaan Pemasangan Paving m2 Nilai HSPK 162,984.00
Stone Tebal 6 Cm Abu - Abu Persegi (dibulatkan) :
Panjang (K-200) Untuk Jalan
Lingkungan Hidup

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.013 O.H 130,000 1,625.00
1.10.28.02.01.001.002 Kepala Tukang 0.013 O.H 120,000 1,500.00
1.10.28.02.01.001.006 Tukang Batu 0.250 O.H 110,000 27,500.00
1.10.28.02.01.002.001 Pekerja 0.500 O.H 90,000 45,000.00
Jumlah Harga Tenaga Kerja 75,625.00
Bahan
1.1.7.01.01.01.022.00299 Paving Stone Persegi, Tebal. 6 cm, 1.000 m2 66,100 66,100.00
Abu-Abu (K 200)
Jumlah Harga Bahan 66,100.00
Peralatan
Jumlah Harga Peralatan
Jumlah 141,725.00
Overhead & Profit 15 % 21,258.75

Nilai HSPK : 162,984.00


2.01.02.01.01.012 1 m' Pekerjaan Pemasangan Kanstin m' Nilai HSPK 144,870.00
Uk. 15.35.50 (K-300) (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.001 O.H 130,000 130.00
1.10.28.02.01.001.002 Kepala Tukang 0.010 O.H 120,000 1,200.00
1.10.28.02.01.001.006 Tukang Batu 0.100 O.H 110,000 11,000.00

127
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
1.10.28.02.01.002.001 Pekerja 0.200 O.H 90,000 18,000.00
Jumlah Harga Tenaga Kerja 30,330.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 18.000 Kg 1,306 23,510.82
1.1.7.01.01.01.004.00002 Pasir Pasang 0.001 m3 232,250 232.25
1.1.7.01.01.01.022.00308 Kanstain Uk. 35 x 15 x 50 cm Profil 2.000 Buah 35,950 71,900.00

Jumlah Harga Bahan 95,643.07


Peralatan
Jumlah Harga Peralatan
Jumlah 125,973.07
Overhead & Profit 15 % 18,895.96

Nilai HSPK : 144,870.00


2.01.02.01.01.013 1 m' Pekerjaan Pemasangan Kanstin m' Nilai HSPK 131,185.00
Uk. 15.25.40 (K-300) (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.001 O.H 130,000 130.00
1.10.28.02.01.001.002 Kepala Tukang 0.010 O.H 120,000 1,200.00
1.10.28.02.01.001.006 Tukang Batu 0.100 O.H 110,000 11,000.00
1.10.28.02.01.002.001 Pekerja 0.200 O.H 90,000 18,000.00
Jumlah Harga Tenaga Kerja 30,330.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 18.000 Kg 1,306 23,510.82
1.1.7.01.01.01.004.00002 Pasir Pasang 0.001 m3 232,250 232.25
1.1.7.01.01.01.022.00307 Kanstain Uk. 25 x 15 x 40 cm 2.500 buah 24,000 60,000.00
Jumlah Harga Bahan 83,743.07
Peralatan
Jumlah Harga Peralatan
Jumlah 114,073.07
Overhead & Profit 15 % 17,110.96

Nilai HSPK : 131,185.00


2.01.02.01.01.014 1 m' Pekerjaan Pemasangan m' Nilai HSPK 51,260.00
Stopper/ Uskup (K-300) (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.001 O.H 130,000 130.00
1.10.28.02.01.001.002 Kepala Tukang 0.010 O.H 120,000 1,200.00
1.10.28.02.01.001.006 Tukang Batu 0.100 O.H 110,000 11,000.00
1.10.28.02.01.002.001 Pekerja 0.200 O.H 90,000 18,000.00
Jumlah Harga Tenaga Kerja 30,330.00
Bahan
1.1.7.01.01.01.004.00002 Pasir Pasang 0.001 m3 232,250 232.25
1.1.7.01.01.01.022.00304 Paving Stone Uskup 0.167 m2 83,900 14,011.30
Jumlah Harga Bahan 14,243.55
Peralatan
Jumlah Harga Peralatan
Jumlah 44,573.55
Overhead & Profit 15 % 6,686.03

Nilai HSPK : 51,260.00


2.01.02.01.02 Pengadaan Agregat
2.01.02.01.02.001 1 m3 Pengadaan Agregat Kelas A m3 Nilai HSPK 961,088.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.009 OH 90,000 810.00
1.10.28.02.01.001.001 Mandor 0.005 OH 130,000 585.00
Jumlah Harga Tenaga Kerja 1,395.00
Bahan
1.1.7.01.01.01.005.00060 Agregat Pecah Kasar 0.734 m3 231,350 169,695.23
1.1.7.01.01.01.005.00061 Agregat Halus Lapis Pondasi A 0.317 m3 224,300 71,013.38
Jumlah Harga Bahan 240,708.61
Peralatan
9.1.2.09.03.01.001.00029 Wheel Loader 0.032 jam 708,250 22,309.88

128
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
1.3.2.01.01.12.001.00001 Blending Equipment 0.048 jam 11,853,000 571,314.60
Jumlah Harga Peralatan 593,624.48
Jumlah 835,728.08
Overhead & Profit 15 % 125,359.21

Nilai HSPK : 961,088.00


2.01.02.01.02.002 1 m3 Pengadaan Agregat Kelas B m3 Nilai HSPK 958,486.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.009 OH 90,000 810.00
1.10.28.02.01.001.001 Mandor 0.005 OH 130,000 585.00
Jumlah Harga Tenaga Kerja 1,395.00
Bahan
1.1.7.01.01.01.005.00060 Agregat Pecah Kasar 0.416 m3 231,350 96,195.33
1.1.7.01.01.01.005.00061 Agregat Halus Lapis Pondasi A 0.634 m3 224,300 142,251.06
Jumlah Harga Bahan 238,446.39
Peralatan
9.1.2.09.03.01.001.00029 Wheel Loader 0.032 jam 708,250 22,309.88
1.3.2.01.01.12.001.00001 Blending Equipment 0.048 jam 11,853,000 571,314.60
Jumlah Harga Peralatan 593,624.48
Jumlah 833,465.87
Overhead & Profit 15 % 125,019.88

Nilai HSPK : 958,486.00


2.01.02.01.02.003 1 m3 Pengadaan Agregat Kelas S m3 Nilai HSPK 953,513.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.009 OH 90,000 810.00
1.10.28.02.01.001.001 Mandor 0.005 OH 130,000 585.00
Jumlah Harga Tenaga Kerja 1,395.00
Bahan
1.1.7.01.01.01.005.00060 Agregat Pecah Kasar 0.189 m3 231,350 43,725.15
1.1.7.01.01.01.005.00064 Agregat Lolos # 1 inch. 0.192 m3 210,000 40,362.00
1.1.7.01.01.01.005.00061 Agregat Halus Lapis Pondasi A 0.669 m3 224,300 150,034.27
Jumlah Harga Bahan 234,121.42
Peralatan
9.1.2.09.03.01.001.00029 Wheel Loader 0.032 jam 708,250 22,309.88
1.3.2.01.01.12.001.00001 Blending Equipment 0.048 jam 11,853,000 571,314.60
Jumlah Harga Peralatan 593,624.48
Jumlah 829,140.90
Overhead & Profit 15 % 124,371.13

Nilai HSPK : 953,513.00


2.01.02.01.02.004 1 m3 Pengadaan Lapis Pondasi m3 Nilai HSPK 944,853.00
Agregat (Cbr 60%) (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.009 OH 90,000 810.00
1.10.28.02.01.001.001 Mandor 0.005 OH 130,000 585.00
Jumlah Harga Tenaga Kerja 1,395.00
Bahan
1.1.7.01.01.01.005.00060 Agregat Pecah Kasar 0.252 m3 231,350 58,300.20
1.1.7.01.01.01.005.00064 Agregat Lolos # 1 inch. 0.223 m3 210,000 46,851.00
1.1.7.01.01.01.005.00065 Fraksi Lolos Scalping 0-37,5 Mm 0.575 m3 211,200 121,440.00
(Screen 0-37,5 Mm)
Jumlah Harga Bahan 226,591.20
Peralatan
9.1.2.09.03.01.001.00029 Wheel Loader 0.032 jam 708,250 22,309.88
1.3.2.01.01.12.001.00001 Blending Equipment 0.048 jam 11,853,000 571,314.60
Jumlah Harga Peralatan 593,624.48
Jumlah 821,610.68
Overhead & Profit 15 % 123,241.60

Nilai HSPK : 944,853.00

129
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
2.01.02.01.02.005 1 m3 Pengadaan Lapis Permukaan m3 Nilai HSPK 918,435.00
Agregat (Cbr 60%) (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.009 OH 90,000 810.00
1.10.28.02.01.001.001 Mandor 0.005 OH 130,000 585.00
Jumlah Harga Tenaga Kerja 1,395.00
Bahan
1.1.7.01.01.01.005.00060 Agregat Pecah Kasar 0.479 m3 231,350 110,770.38
1.1.7.01.01.01.004.00003 Pasir Urug 0.571 m3 162,550 92,848.56
Jumlah Harga Bahan 203,618.94
Peralatan
9.1.2.09.03.01.001.00029 Wheel Loader 0.032 jam 708,250 22,309.88
1.3.2.01.01.12.001.00001 Blending Equipment 0.048 jam 11,853,000 571,314.60
Jumlah Harga Peralatan 593,624.48
Jumlah 798,638.42
Overhead & Profit 15 % 119,795.76

Nilai HSPK : 918,435.00


2.01.02.01.02.006 1 m3 Pengadaan Agregat Kelas C m3 Nilai HSPK 266,053.00
(dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
1.1.7.01.01.01.005.00060 Agregat Pecah Kasar 1.000 m3 231,350 231,350.00
Jumlah Harga Bahan 231,350.00
Peralatan
Jumlah Harga Peralatan
Jumlah 231,350.00
Overhead & Profit 15 % 34,702.50

Nilai HSPK : 266,053.00


2.01.02.01.02.007 1 m3 Pengadaan Agregat Halus m3 Nilai HSPK 257,945.00
(dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
1.1.7.01.01.01.005.00061 Agregat Halus Lapis Pondasi A 1.000 m3 224,300 224,300.00
Jumlah Harga Bahan 224,300.00
Peralatan
Jumlah Harga Peralatan
Jumlah 224,300.00
Overhead & Profit 15 % 33,645.00

Nilai HSPK : 257,945.00


2.01.02.01.02.008 1 m3 Pengadaan Agregat Lolos m3 Nilai HSPK 249,780.00
Screen (0-5) (dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
1.1.7.01.01.01.005.00062 Agregat Pecah Mesin (0-5) 1.000 m3 217,200 217,200.00
Jumlah Harga Bahan 217,200.00
Peralatan
Jumlah Harga Peralatan
Jumlah 217,200.00
Overhead & Profit 15 % 32,580.00

Nilai HSPK : 249,780.00


2.01.02.01.02.009 1 m3 Pengadaan Agregat Lolos m3 Nilai HSPK 241,500.00
Screen (5-9.5) (dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
1.1.7.01.01.01.005.00064 Agregat Lolos # 1 inch. 1.000 m3 210,000 210,000.00

130
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Jumlah Harga Bahan 210,000.00
Peralatan
Jumlah Harga Peralatan
Jumlah 210,000.00
Overhead & Profit 15 % 31,500.00

Nilai HSPK : 241,500.00


2.01.02.01.02.010 1 m3 Pengadaan Agregat Lolos m3 Nilai HSPK 242,880.00
Screen (9.5-19) (dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
1.1.7.01.01.01.005.00065 Fraksi Lolos Scalping 0-37,5 Mm 1.000 m3 211,200 211,200.00
(Screen 0-37,5 Mm)
Jumlah Harga Bahan 211,200.00
Peralatan
Jumlah Harga Peralatan
Jumlah 211,200.00
Overhead & Profit 15 % 31,680.00

Nilai HSPK : 242,880.00


2.01.02.01.02.011 1 m3 Pengadaan Agregat Pecah m3 Nilai HSPK 266,053.00
Kasar (dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
1.1.7.01.01.01.005.00060 Agregat Pecah Kasar 1.000 m3 231,350 231,350.00
Jumlah Harga Bahan 231,350.00
Peralatan
Jumlah Harga Peralatan
Jumlah 231,350.00
Overhead & Profit 15 % 34,702.50

Nilai HSPK : 266,053.00


2.01.02.01.03 Pekerjaan Drainase (Divisi 2)

2.01.02.01.03.001 1 m3 Galian Untuk Selokan Drainase An. EI-211 m3 Nilai HSPK 83,208.00
Dan Saluran Air (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.004 OH 90,000 396.00
1.10.28.02.01.001.001 Mandor 0.001 OH 130,000 143.00
Jumlah Harga Tenaga Kerja 539.00
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.09.01.01.001.00001 Excavator 0.008 Jam 818,550 6,220.98
9.1.2.08.01.01.001.00001 Dump Truck 0.132 jam 496,550 65,594.26
Jumlah Harga Peralatan 71,815.24
Jumlah 72,354.24
Overhead & Profit 15 % 10,853.14

Nilai HSPK : 83,208.00


2.01.02.01.03.002 1 m3 Pasangan Batu Dengan Mortar An. EI-221 m3 Nilai HSPK 919,143.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.574 OH 90,000 51,642.00
1.10.28.02.01.001.006 Tukang Batu 0.172 OH 110,000 18,942.00
1.10.28.02.01.001.001 Mandor 0.057 OH 130,000 7,462.00
Jumlah Harga Tenaga Kerja 78,046.00
Bahan
1.1.7.01.01.01.005.00006 Batu Kali Uk. 15-20 cm 1.080 m3 261,250 282,150.00
1.1.7.01.01.01.002.00001 Semen Portland 161.000 Kg 1,306 210,291.20
1.1.7.01.01.01.004.00002 Pasir Pasang 0.483 m3 232,250 112,153.53
Jumlah Harga Bahan 604,594.72

131
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Peralatan
9.1.2.09.03.01.001.00008 Conc. Mixer 0.402 jam 290,300 116,613.51
Jumlah Harga Peralatan 116,613.51
Jumlah 799,254.23
Overhead & Profit 15 % 119,888.13

Nilai HSPK : 919,143.00


2.01.02.01.03.003 1 m' Gorong-Gorong Pipa Beton An. EI-231 m' Nilai HSPK 815,454.00
Bertulang, Dia. Dalam 35-45 Cm (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.333 OH 90,000 30,006.00
1.10.28.02.01.001.006 Tukang Batu 0.133 OH 110,000 14,674.00
1.10.28.02.01.001.001 Mandor 0.067 OH 130,000 8,671.00
Jumlah Harga Tenaga Kerja 53,351.00
Bahan
2.01.02.01.08.004 Beton K-300 0.105 m3 2,329,043.00 245,015.32
1.1.7.01.01.01.012.00006 Besi Beton Polos 11.568 Kg 11,050 127,828.61
2.01.02.01.03.010 Urugan Porus 0.124 m3 356,674.00 44,191.91
1.1.7.01.01.01.004.00004 Pasir Sirtu 0.813 m3 180,000 146,304.00
Jumlah Harga Bahan 563,339.84
Peralatan
9.1.2.09.03.01.001.00018 Stamper 1.009 jam 38,400 38,753.28
9.1.2.08.01.01.001.00053 Flat Bed Truck 0.154 jam 348,350 53,645.90
Jumlah Harga Peralatan 92,399.18
Jumlah 709,090.02
Overhead & Profit 15 % 106,363.50

Nilai HSPK : 815,454.00


2.01.02.01.03.004 1 m' Gorong-Gorong Pipa Beton An. EI-232 m' Nilai HSPK 1,138,222.00
Bertulang, Diameter 55-65 Cm (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.700 OH 90,000 63,000.00
1.10.28.02.01.001.006 Tukang Batu 0.200 OH 110,000 22,000.00
1.10.28.02.01.001.001 Mandor 0.100 OH 130,000 13,000.00
Jumlah Harga Tenaga Kerja 98,000.00
Bahan
2.01.02.01.08.004 Beton K-300 0.146 m3 2,329,043.00 340,273.18
1.1.7.01.01.01.012.00006 Besi Beton Polos 16.061 Kg 11,050 177,470.74
2.01.02.01.03.010 Urugan Porus 0.145 m3 356,674.00 51,682.06
1.1.7.01.01.01.004.00004 Pasir Sirtu 1.063 m3 180,000 191,340.00
Jumlah Harga Bahan 760,765.98
Peralatan
9.1.2.09.03.01.001.00018 Stamper 1.316 Jam 38,400 50,522.88
9.1.2.08.01.01.001.00053 Flat Bed Truck 0.231 Jam 348,350 80,468.85
Jumlah Harga Peralatan 130,991.73
Jumlah 989,757.71
Overhead & Profit 15 % 148,463.66

Nilai HSPK : 1,138,222.00


2.01.02.01.03.005 1 m' Gorong-Gorong Pipa Beton An. EI-233 m' Nilai HSPK 2,316,437.00
Bertulang, Dia. Dalam 75-85 Cm (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 2.000 OH 90,000 180,000.00
1.10.28.02.01.001.006 Tukang Batu 0.250 OH 110,000 27,500.00
1.10.28.02.01.001.001 Mandor 0.250 OH 130,000 32,500.00
Jumlah Harga Tenaga Kerja 240,000.00
Bahan
2.01.02.01.08.004 Beton K-300 0.290 m3 2,329,043.00 674,956.66
1.1.7.01.01.01.012.00006 Besi Beton Polos 31.871 Kg 11,050 352,171.24
2.01.02.01.03.010 Urugan Porus 0.310 m3 356,674.00 110,675.94
1.1.7.01.01.01.004.00004 Pasir Sirtu 1.911 m3 180,000 344,052.00

132
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Jumlah Harga Bahan 1,481,855.84
Peralatan
9.1.2.09.03.01.001.00018 Stamper 2.378 Jam 38,400 91,299.84
9.1.2.08.01.01.001.00053 Flat Bed Truck 0.577 Jam 348,350 201,137.29
Jumlah Harga Peralatan 292,437.13
Jumlah 2,014,292.97
Overhead & Profit 15 % 302,143.95

Nilai HSPK : 2,316,437.00


2.01.02.01.03.006 1 m' Gorong-Gorong Pipa Beton An. EI-234 m' Nilai HSPK 2,948,368.00
Bertulang, Dia. Dalam 95-105 Cm (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 2.000 OH 90,000 180,000.00
1.10.28.02.01.001.006 Tukang Batu 0.250 OH 110,000 27,500.00
1.10.28.02.01.001.001 Mandor 0.250 OH 130,000 32,500.00
Jumlah Harga Tenaga Kerja 240,000.00
Bahan
2.01.02.01.08.004 Beton K-300 0.409 m3 2,329,043.00 951,414.07
1.1.7.01.01.01.012.00006 Besi Beton Polos 44.925 Kg 11,050 496,419.04
2.01.02.01.03.010 Urugan Porus 0.416 m3 356,674.00 148,305.05
1.1.7.01.01.01.004.00004 Pasir Sirtu 2.310 m3 180,000 415,800.00
Jumlah Harga Bahan 2,011,938.15
Peralatan
9.1.2.09.03.01.001.00018 Stamper 2.883 Jam 38,400 110,722.56
9.1.2.08.01.01.001.00053 Flat Bed Truck 0.577 Jam 348,350 201,137.29
Jumlah Harga Peralatan 311,859.85
Jumlah 2,563,798.00
Overhead & Profit 15 % 384,569.70

Nilai HSPK : 2,948,368.00


2.01.02.01.03.007 1 m' Gorong-Gorong Pipa Beton An. EI-236 m' Nilai HSPK 269,473.00
Tanpa Tulangan Dia. Dalam 20 Cm (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.250 OH 90,000 22,500.00
1.10.28.02.01.001.001 Mandor 0.050 OH 130,000 6,500.00
Jumlah Harga Tenaga Kerja 29,000.00
Bahan
2.01.02.01.08.006 Beton K-175 0.054 m3 1,624,927.00 88,071.04
2.01.02.01.03.010 Urugan Porus 0.066 m3 356,674.00 23,611.82
1.1.7.01.01.01.004.00004 Pasir Sirtu 0.228 m3 180,000 40,986.00
Jumlah Harga Bahan 152,668.86
Peralatan
9.1.2.09.03.01.001.00018 Stamper 0.004 jam 38,400 142.08
9.1.2.09.03.01.001.00018 Stamper 0.274 jam 38,400 10,536.96
9.1.2.08.01.01.001.00053 Flat Bed Truck 0.121 jam 348,350 41,976.18
Jumlah Harga Peralatan 52,655.22
Jumlah 234,324.08
Overhead & Profit 15 % 35,148.61

Nilai HSPK : 269,473.00


2.01.02.01.03.008 1 m' Gorong-Gorong Pipa Beton An. EI-237 m' Nilai HSPK 298,921.00
Tanpa Tulangan Dia. Dalam 25 Cm (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.250 OH 90,000 22,500.00
1.10.28.02.01.001.001 Mandor 0.050 OH 130,000 6,500.00
Jumlah Harga Tenaga Kerja 29,000.00
Bahan
2.01.02.01.08.006 Beton K-175 0.064 m3 1,624,927.00 104,645.30
2.01.02.01.03.010 Urugan Porus 0.071 m3 356,674.00 25,466.52
1.1.7.01.01.01.004.00004 Pasir Sirtu 0.259 m3 180,000 46,674.00
Jumlah Harga Bahan 176,785.82

133
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Peralatan
9.1.2.09.03.01.001.00018 Stamper 0.005 jam 38,400 172.80
9.1.2.09.03.01.001.00018 Stamper 0.312 jam 38,400 11,996.16
9.1.2.08.01.01.001.00053 Flat Bed Truck 0.121 jam 348,350 41,976.18
Jumlah Harga Peralatan 54,145.14
Jumlah 259,930.96
Overhead & Profit 15 % 38,989.64

Nilai HSPK : 298,921.00


2.01.02.01.03.009 1 m' Gorong-Gorong Pipa Beton An. EI-238 m' Nilai HSPK 328,729.00
Tanpa Tulangan Dia. Dalam 30 Cm (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.250 OH 90,000 22,500.00
1.10.28.02.01.001.001 Mandor 0.050 OH 130,000 6,500.00
Jumlah Harga Tenaga Kerja 29,000.00
Bahan
2.01.02.01.08.006 Beton K-175 0.075 m3 1,624,927.00 121,219.55
2.01.02.01.03.010 Urugan Porus 0.077 m3 356,674.00 27,356.90
1.1.7.01.01.01.004.00004 Pasir Sirtu 0.292 m3 180,000 52,578.00
Jumlah Harga Bahan 201,154.45
Peralatan
9.1.2.09.03.01.001.00018 Stamper 0.005 jam 38,400 207.36
9.1.2.09.03.01.001.00018 Stamper 0.352 jam 38,400 13,512.96
9.1.2.08.01.01.001.00053 Flat Bed Truck 0.121 jam 348,350 41,976.18
Jumlah Harga Peralatan 55,696.50
Jumlah 285,850.95
Overhead & Profit 15 % 42,877.64

Nilai HSPK : 328,729.00


2.01.02.01.03.010 1 m3 Bahan Porous Untuk Bahan Nilai HSPK 356,674.00
Penyaring (Filter) (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.400 OH 90,000 36,000.00
1.10.28.02.01.001.001 Mandor 0.100 OH 130,000 13,000.00
Jumlah Harga Tenaga Kerja 49,000.00
Bahan
1.1.7.01.01.01.005.00060 Agregat Pecah Kasar 0.550 m3 231,350 127,242.50
1.1.7.01.01.01.004.00002 Pasir Pasang 0.550 m3 232,250 127,737.50
Jumlah Harga Bahan 254,980.00
Peralatan
9.1.2.09.03.01.001.00018 Stamper 0.161 Jam 38,400 6,170.88
Jumlah Harga Peralatan 6,170.88
Jumlah 310,150.88
Overhead & Profit 15 % 46,522.63

Nilai HSPK : 356,674.00


2.01.02.01.04 Pekerjaan Tanah (Divisi 3)
2.01.02.01.04.001 1 m3 Galian Biasa (Termasuk An. EI-311a m3 Nilai HSPK 216,371.00
Pembuangan Sisa Galian) (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.007 OH 90,000 666.00
1.10.28.02.01.001.001 Mandor 0.004 OH 130,000 481.00
Jumlah Harga Tenaga Kerja 1,147.00
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.09.01.01.001.00001 Excavator 0.026 Jam 818,550 20,954.88
9.1.2.08.01.01.001.00001 Dump Truck 0.334 Jam 496,550 166,046.32
Jumlah Harga Peralatan 187,001.20
Jumlah 188,148.20
Overhead & Profit 15 % 28,222.23

134
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Nilai HSPK : 216,371.00
2.01.02.01.04.002 1 m3 Galian Batu Lunak (Termasuk An. EI-311b m3 Nilai HSPK 315,499.00
Pembuangan Sisa Galian) (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.064 OH 90,000 5,742.00
1.10.28.02.01.001.001 Mandor 0.008 OH 130,000 1,040.00
Jumlah Harga Tenaga Kerja 6,782.00
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.09.03.01.001.00051 Compressor 0.056 Jam 151,100 8,431.38
9.1.2.09.03.01.001.00040 Jack Hammer 0.056 Jam 37,300 2,081.34
9.1.2.09.03.01.001.00029 Wheel Loader 0.056 Jam 708,250 39,520.35
9.1.2.09.01.01.001.00001 Excavator 0.056 Jam 818,550 45,675.09
9.1.2.08.01.01.001.00001 Dump Truck 0.346 Jam 496,550 171,855.96
Jumlah Harga Peralatan 267,564.12
Jumlah 274,346.12
Overhead & Profit 15 % 41,151.92

Nilai HSPK : 315,499.00


2.01.02.01.04.003 1 m3 Galian Batu (Termasuk An. EI-312 m3 Nilai HSPK 365,915.00
Pembuangan Sisa Galian) (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.084 OH 90,000 7,596.00
1.10.28.02.01.001.001 Mandor 0.011 OH 130,000 1,378.00
Jumlah Harga Tenaga Kerja 8,974.00
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.09.03.01.001.00051 Compressor 0.074 Jam 151,100 11,151.18
9.1.2.09.03.01.001.00040 Jack Hammer 0.074 Jam 37,300 2,752.74
9.1.2.09.03.01.001.00029 Wheel Loader 0.074 Jam 708,250 52,268.85
9.1.2.09.01.01.001.00001 Excavator 0.074 Jam 818,550 60,408.99
9.1.2.08.01.01.001.00001 Dump Truck 0.368 Jam 496,550 182,631.09
Jumlah Harga Peralatan 309,212.85
Jumlah 318,186.85
Overhead & Profit 15 % 47,728.03

Nilai HSPK : 365,915.00


2.01.02.01.04.004 1 m3 Galian Struktur Dengan An. EI-313 m3 Nilai HSPK 12,377.00
Kedalaman 0-2 Meter (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.003 OH 90,000 270.00
1.10.28.02.01.001.001 Mandor 0.001 OH 130,000 104.00
Jumlah Harga Tenaga Kerja 374.00
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.09.01.01.001.00001 Excavator 0.005 Jam 818,550 4,256.46
9.1.2.09.02.01.001.00001 Bulldozer 0.015 Jam 420,000 6,132.00
Jumlah Harga Peralatan 10,388.46
Jumlah 10,762.46
Overhead & Profit 15 % 1,614.37

Nilai HSPK : 12,377.00


2.01.02.01.04.005 1 m3 Galian Struktur Dengan An. EI-314 m3 Nilai HSPK 13,506.00
Kedalaman 2-4 Meter (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.008 OH 90,000 747.00
1.10.28.02.01.001.001 Mandor 0.001 OH 130,000 117.00
Jumlah Harga Tenaga Kerja 864.00

135
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.09.01.01.001.00001 Excavator 0.006 Jam 818,550 4,747.59
9.1.2.09.02.01.001.00001 Bulldozer 0.015 Jam 420,000 6,132.00
Jumlah Harga Peralatan 10,879.59
Jumlah 11,743.59
Overhead & Profit 15 % 1,761.54

Nilai HSPK : 13,506.00


2.01.02.01.04.006 1 m3 Galian Struktur Dengan An. EI-315 m3 Nilai HSPK 16,978.00
Kedalaman 4-6 Meter (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.015 OH 90,000 1,341.00
1.10.28.02.01.001.001 Mandor 0.001 OH 130,000 169.00
Jumlah Harga Tenaga Kerja 1,510.00
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.09.01.01.001.00001 Excavator 0.009 Jam 818,550 7,121.39
9.1.2.09.02.01.001.00001 Bulldozer 0.015 Jam 420,000 6,132.00
Jumlah Harga Peralatan 13,253.39
Jumlah 14,763.39
Overhead & Profit 15 % 2,214.51

Nilai HSPK : 16,978.00


2.01.02.01.04.007 1 m3 Galian Perkerasan Beraspal An. EI-316 m3 Nilai HSPK 295,162.00
Dengan Cold Milling Machine (dibulatkan) :
(Termasuk Pembuangan Sisa Galian)

Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.011 OH 90,000 954.00
1.10.28.02.01.001.001 Mandor 0.005 OH 130,000 689.00
Jumlah Harga Tenaga Kerja 1,643.00
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.09.03.01.001.00036 Cold Milling 0.037 Jam 619,450 22,981.60
9.1.2.08.01.01.001.00001 Dump Truck 0.467 Jam 496,550 232,037.82
Jumlah Harga Peralatan 255,019.41
Jumlah 256,662.41
Overhead & Profit 15 % 38,499.36

Nilai HSPK : 295,162.00


2.01.02.01.04.008 1 m3 Galian Perkerasan Beraspal An. EI-317 m3 Nilai HSPK 1,165,984.00
Tanpa Cold Milling Machine (dibulatkan) :
(Termasuk Pembuangan Sisa Galian)

Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.048 OH 90,000 4,293.00
1.10.28.02.01.001.001 Mandor 0.024 OH 130,000 3,107.00
Jumlah Harga Tenaga Kerja 7,400.00
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.09.03.01.001.00040 Jack Hammer 2.410 Jam 37,300 89,881.81
9.1.2.09.03.01.001.00051 Compressor 2.410 Jam 151,100 364,105.67
9.1.2.08.01.01.001.00001 Dump Truck 1.113 Jam 496,550 552,511.19
Jumlah Harga Peralatan 1,006,498.67
Jumlah 1,013,898.67
Overhead & Profit 15 % 152,084.80

Nilai HSPK : 1,165,984.00

136
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
2.01.02.01.04.009 1 m2 Penyiapan Badan Jalan An. EI-331 m2 Nilai HSPK 411.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.000 OH 90,000 36.00
1.10.28.02.01.001.001 Mandor 0.000 OH 130,000 13.00
Jumlah Harga Tenaga Kerja 49.00
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.09.02.01.001.00006 Motor Grader 0.001 Jam 372,450 223.47
9.1.2.09.03.01.001.00021 Vibro Roller 0.001 jam 168,500 84.25
Jumlah Harga Peralatan 307.72
Jumlah 356.72
Overhead & Profit 15 % 53.51

Nilai HSPK : 411.00


2.01.02.01.04.010 1 Buah Pemotongan Pohon Pilihan An. EI-342 Buah Nilai HSPK 226,222.00
Diameter 15 – 30 Cm (Termasuk (dibulatkan) :
Pembuangan Dengan Dump Truck)

Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.500 OH 90,000 45,000.00
1.10.28.02.01.001.001 Mandor 0.050 OH 130,000 6,500.00
Jumlah Harga Tenaga Kerja 51,500.00
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.08.01.01.001.00001 Dump Truck 0.199 Jam 496,550 98,714.14
9.1.2.09.03.01.001.00057 Chainsaw 1.000 Jam 46,500 46,500.00
Jumlah Harga Peralatan 145,214.14
Jumlah 196,714.14
Overhead & Profit 15 % 29,507.12

Nilai HSPK : 226,222.00


2.01.02.01.04.011 1 Buah Pemotongan Pohon Pilihan An. EI-343 Buah Nilai HSPK 282,982.00
Diameter 30 – 50 Cm (Termasuk (dibulatkan) :
Pembuangan Dengan Dump Truck)

Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.500 OH 90,000 45,000.00
1.10.28.02.01.001.001 Mandor 0.050 OH 130,000 6,500.00
Jumlah Harga Tenaga Kerja 51,500.00
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.08.01.01.001.00001 Dump Truck 0.298 Jam 496,550 148,071.21
9.1.2.09.03.01.001.00057 Chainsaw 1.000 Jam 46,500 46,500.00
Jumlah Harga Peralatan 194,571.21
Jumlah 246,071.21
Overhead & Profit 15 % 36,910.68

Nilai HSPK : 282,982.00


2.01.02.01.04.012 1 Buah Pemotongan Pohon Pilihan An. EI-344 Buah Nilai HSPK 396,504.00
Diameter 50 – 75 Cm (Termasuk (dibulatkan) :
Pembuangan Dengan Dump Truck)

Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.500 OH 90,000 45,000.00
1.10.28.02.01.001.001 Mandor 0.050 OH 130,000 6,500.00
Jumlah Harga Tenaga Kerja 51,500.00
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.08.01.01.001.00001 Dump Truck 0.497 Jam 496,550 246,785.35

137
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
9.1.2.09.03.01.001.00057 Chainsaw 1.000 Jam 46,500 46,500.00
Jumlah Harga Peralatan 293,285.35
Jumlah 344,785.35
Overhead & Profit 15 % 51,717.80

Nilai HSPK : 396,504.00


2.01.02.01.04.013 1 Buah Pemotongan Pohon Pilihan An. EI-345 Buah Nilai HSPK 756,192.00
Diameter > 75 Cm (Termasuk (dibulatkan) :
Pembuangan Dengan Dump Truck)

Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.667 OH 90,000 60,003.00
1.10.28.02.01.001.001 Mandor 0.067 OH 130,000 8,671.00
Jumlah Harga Tenaga Kerja 68,674.00
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.08.01.01.001.00001 Dump Truck 1.084 Jam 496,550 538,458.82
9.1.2.09.03.01.001.00057 Chainsaw 1.084 Jam 46,500 50,424.60
Jumlah Harga Peralatan 588,883.42
Jumlah 657,557.42
Overhead & Profit 15 % 98,633.61

Nilai HSPK : 756,192.00


2.01.02.01.04.014 1 m3 Galian Perkerasan Berbutir An. EI-318 m3 Nilai HSPK 214,608.00
(Termasuk Pembuangan Dengan (dibulatkan) :
Dump Truck)

Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.214 OH 90,000 19,287.00
1.10.28.02.01.001.001 Mandor 0.036 OH 130,000 4,654.00
Jumlah Harga Tenaga Kerja 23,941.00
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.09.03.01.001.00040 Jack Hammer 0.268 Jam 37,300 9,988.94
9.1.2.09.03.01.001.00051 Compressor 0.268 Jam 151,100 40,464.58
9.1.2.08.01.01.001.00001 Dump Truck 0.226 Jam 496,550 112,220.30
Jumlah Harga Peralatan 162,673.82
Jumlah 186,614.82
Overhead & Profit 15 % 27,992.22

Nilai HSPK : 214,608.00


2.01.02.01.04.015 1 m2 Pemasangan Geotekstile An.EI-352 m2 Nilai HSPK 61,610.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.007 OH 130,000 871.00
1.10.28.02.01.002.001 Pekerja 0.054 OH 90,000 4,860.00
Jumlah Harga Tenaga Kerja 5,731.00
Bahan
1.1.7.01.01.01.022.00205 Geotextile Woven Uk. 0,8 mm, 200 1.000 m2 31,400 31,400.00
gr (3,2 x 200)
Jumlah Harga Bahan 31,400.00
Peralatan
9.1.2.08.01.01.001.00053 Flat Bed Truck 0.047 jam 348,350 16,442.12
Jumlah Harga Peralatan 16,442.12
Jumlah 53,573.12
Overhead & Profit 15 % 8,035.97

Nilai HSPK : 61,610.00


2.01.02.01.05 Pekerjaan Pelebaran Perkerasan Dan
Bahu Jalan (Divisi 4)

138
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
2.01.02.01.05.001 1 m3 Lapis Pondasi Agregat Kelas A An.EI-421 m3 Nilai HSPK 587,601.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.009 OH 90,000 765.00
1.10.28.02.01.001.001 Mandor 0.001 OH 130,000 169.00
Jumlah Harga Tenaga Kerja 934.00
Bahan
1.1.7.01.01.01.005.00029 Batu Agregat Kelas A 1.259 m3 232,250 292,309.85
Jumlah Harga Bahan 292,309.85
Peralatan
9.1.2.09.03.01.001.00029 Wheel Loader 0.009 Jam 708,250 6,020.13
9.1.2.08.01.01.001.00001 Dump Truck 0.390 Jam 496,550 193,555.19
9.1.2.09.02.01.001.00006 Motor Grader 0.009 Jam 372,450 3,501.03
9.1.2.09.03.01.001.00019 Tandem Roller 0.012 Jam 714,050 8,497.20
9.1.2.08.01.01.001.00005 Water Tanker 0.014 Jam 435,400 6,139.14
Jumlah Harga Peralatan 217,712.68
Jumlah 510,956.53
Overhead & Profit 15 % 76,643.48

Nilai HSPK : 587,601.00


2.01.02.01.05.002 1 m3 Lapis Pondasi Agregat Kelas B An.EI-422a m3 Nilai HSPK 755,965.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.009 OH 90,000 765.00
1.10.28.02.01.001.001 Mandor 0.001 OH 130,000 169.00
Jumlah Harga Tenaga Kerja 934.00
Bahan
1.1.7.01.01.01.005.00030 Batu Agregat Kelas B 1.259 m3 209,000 263,047.40
Jumlah Harga Bahan 263,047.40
Peralatan
9.1.2.09.03.01.001.00029 Wheel Loader 0.009 Jam 708,250 6,020.13
9.1.2.08.01.01.001.00001 Dump Truck 0.745 Jam 496,550 370,078.72
9.1.2.09.02.01.001.00006 Motor Grader 0.009 Jam 372,450 3,501.03
9.1.2.09.03.01.001.00019 Tandem Roller 0.011 Jam 714,050 7,640.34
9.1.2.08.01.01.001.00005 Water Tanker 0.014 Jam 435,400 6,139.14
Jumlah Harga Peralatan 393,379.35
Jumlah 657,360.75
Overhead & Profit 15 % 98,604.11

Nilai HSPK : 755,965.00


2.01.02.01.05.003 1 Ton Semen Untuk Lapis Pondasi An.EI-423 Ton Nilai HSPK 2,276,883.00
Semen Tanah (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.347 OH 90,000 31,257.00
1.10.28.02.01.001.001 Mandor 0.023 OH 130,000 3,016.00
Jumlah Harga Tenaga Kerja 34,273.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 1,050.000 Kg 1,306 1,371,464.33
Jumlah Harga Bahan 1,371,464.33
Peralatan
9.1.2.08.01.01.001.00001 Dump Truck 1.156 Jam 496,550 574,160.77
Jumlah Harga Peralatan 574,160.77
Jumlah 1,979,898.09
Overhead & Profit 15 % 296,984.71

Nilai HSPK : 2,276,883.00


2.01.02.01.05.004 1 m3 Lapis Pondasi Semen Tanah An.EI-424 m3 Nilai HSPK 1,211,591.00
(Untuk Pelebaran Perkerasan Dan (dibulatkan) :
Bahu Jalan)
Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.008 OH 90,000 729.00
1.10.28.02.01.001.001 Mandor 0.001 OH 130,000 156.00
Jumlah Harga Tenaga Kerja 885.00
Bahan

139
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
1.1.7.01.01.01.004.00005 Tanah Urug 1.200 m3 127,750 153,300.00
Jumlah Harga Bahan 153,300.00
Peralatan
9.1.2.09.03.01.001.00029 Wheel Loader 0.008 Jam 708,250 5,736.83
9.1.2.08.01.01.001.00001 Dump Truck 1.747 Jam 496,550 867,572.16
9.1.2.09.02.01.001.00006 Motor Grader 0.009 Jam 372,450 3,501.03
9.1.2.09.03.01.001.00021 Vibro Roller 0.027 Jam 168,500 4,515.80
9.1.2.09.03.01.001.00016 P. Tyre Roller 0.007 Jam 240,300 1,561.95
9.1.2.08.01.01.001.00005 Water Tanker 0.014 Jam 435,400 6,139.14
9.1.2.09.03.01.001.00036 Cold Milling 0.017 Jam 619,450 10,344.82
Jumlah Harga Peralatan 899,371.72
Jumlah 1,053,556.72
Overhead & Profit 15 % 158,033.51

Nilai HSPK : 1,211,591.00


2.01.02.01.05.005 1 m2 Agregat Penutup Burtu An.EI-425 m2 Nilai HSPK 20,611.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.000 OH 90,000 36.00
1.10.28.02.01.001.001 Mandor 0.000 OH 130,000 13.00
Jumlah Harga Tenaga Kerja 49.00
Bahan
1.1.7.01.01.01.005.00031 Batu Agregat Kelas C1 0.018 m3 162,550 2,860.88
Jumlah Harga Bahan 2,860.88
Peralatan
9.1.2.09.03.01.001.00029 Wheel Loader 0.000 Jam 708,250 70.83
9.1.2.08.01.01.001.00001 Dump Truck 0.030 Jam 496,550 14,797.19
9.1.2.09.03.01.001.00016 P. Tyre Roller 0.001 Jam 240,300 144.18
Jumlah Harga Peralatan 15,012.20
Jumlah 17,922.08
Overhead & Profit 15 % 2,688.31

Nilai HSPK : 20,611.00


2.01.02.01.05.006 1 Liter Bahan Aspal Untuk Pekerjaan An.EI-426 Liter Nilai HSPK 14,785.00
Pelaburan (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.000 OH 90,000 27.00
1.10.28.02.01.001.001 Mandor 0.000 OH 130,000 13.00
Jumlah Harga Tenaga Kerja 40.00
Bahan
1.1.7.01.01.01.001.00003 Aspal Panas AC 60/70 1.079 Kg 11,100 11,976.90
1.1.7.01.01.01.001.00015 Minyak Bakar 0.052 Liter 13,650 715.26
Jumlah Harga Bahan 12,692.16
Peralatan
9.1.2.09.03.01.001.00077 Asphalt Distributor 0.000 Jam 470,000 94.00
9.1.2.09.03.01.001.00051 Compressor 0.000 Jam 151,100 30.22
Jumlah Harga Peralatan 124.22
Jumlah 12,856.38
Overhead & Profit 15 % 1,928.46

Nilai HSPK : 14,785.00


2.01.02.01.05.007 1 Liter Lapis Resap Pengikat An.EI-427 Liter Nilai HSPK 15,886.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.000 OH 90,000 27.00
1.10.28.02.01.001.001 Mandor 0.000 OH 130,000 13.00
Jumlah Harga Tenaga Kerja 40.00
Bahan
1.1.7.01.01.01.001.00003 Aspal Panas AC 60/70 0.635 Kg 11,100 7,042.95
1.1.7.01.01.01.001.00015 Minyak Bakar 0.484 liter 13,650 6,606.60
Jumlah Harga Bahan 13,649.55
Peralatan
9.1.2.09.03.01.001.00077 Asphalt Distributor 0.000 Jam 470,000 94.00
9.1.2.09.03.01.001.00051 Compressor 0.000 Jam 151,100 30.22

140
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Jumlah Harga Peralatan 124.22
Jumlah 13,813.77
Overhead & Profit 15 % 2,072.07

Nilai HSPK : 15,886.00


2.01.02.01.05.008 1 m3 Lapis Pondasi Agregat Kelas S An.EI-422b m3 Nilai HSPK 1,164,948.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.009 OH 90,000 765.00
1.10.28.02.01.001.001 Mandor 0.001 OH 130,000 169.00
Jumlah Harga Tenaga Kerja 934.00
Bahan
1.1.7.01.01.01.005.00027 Batu Agregat Halus 1.259 m3 162,550 204,585.43
Jumlah Harga Bahan 204,585.43
Peralatan
9.1.2.09.03.01.001.00029 Wheel Loader 0.009 jam 708,250 6,020.13
9.1.2.08.01.01.001.00001 Dump Truck 1.591 jam 496,550 789,862.09
9.1.2.09.02.01.001.00006 Motor Grader 0.004 Jam 372,450 1,601.54
9.1.2.09.03.01.001.00019 Tandem Roller 0.005 jam 714,050 3,855.87
9.1.2.08.01.01.001.00005 Water Tanker 0.014 jam 435,400 6,139.14
Jumlah Harga Peralatan 807,478.76
Jumlah 1,012,998.19
Overhead & Profit 15 % 151,949.73

Nilai HSPK : 1,164,948.00


2.01.02.01.05.009 1 m2 Lapisan Perkerasan 5-10 Cm m2 Nilai HSPK 81,232.00
(Padat Digilas) (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.038 O.H 130,000 4,940.00
1.10.28.02.01.002.001 Pekerja 0.095 O.H 90,000 8,550.00
Jumlah Harga Tenaga Kerja 13,490.00
Bahan
1.1.7.01.01.01.005.00004 Batu Pecah Uk. 3-5 cm 0.040 m3 296,100 11,844.00
1.1.7.01.01.01.005.00006 Batu Kali Uk. 15-20 cm 0.100 m3 261,250 26,125.00
1.1.7.01.01.01.001.00003 Aspal Panas AC 60/70 1.500 Kg 11,100 16,650.00
Jumlah Harga Bahan 54,619.00
Peralatan
9.1.2.09.03.01.001.00021 Vibro Roller 0.015 Jam 168,500 2,527.50
Jumlah Harga Peralatan 2,527.50
Jumlah 70,636.50
Overhead & Profit 15 % 10,595.48

Nilai HSPK : 81,232.00


2.01.02.01.06 Pekerjaan Pekerasan Non Aspal
(Divisi 5)
2.01.02.01.06.001 1 m3 Lapis Pondasi Agregat Kelas A An.EI-511 m3 Nilai HSPK 586,675.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.009 OH 90,000 765.00
1.10.28.02.01.001.001 Mandor 0.001 OH 130,000 169.00
Jumlah Harga Tenaga Kerja 934.00
Bahan
1.1.7.01.01.01.005.00029 Batu Agregat Kelas A 1.259 m3 232,250 292,333.08
Jumlah Harga Bahan 292,333.08
Peralatan
9.1.2.09.03.01.001.00029 Wheel Loader 0.009 jam 708,250 6,020.13
9.1.2.08.01.01.001.00001 Dump Truck 0.390 jam 496,550 193,555.19
9.1.2.09.02.01.001.00006 Motor Grader 0.004 Jam 372,450 1,601.54
9.1.2.09.03.01.001.00019 Tandem Roller 0.013 jam 714,050 9,568.27
9.1.2.08.01.01.001.00005 Water Tanker 0.014 jam 435,400 6,139.14
Jumlah Harga Peralatan 216,884.26
Jumlah 510,151.34
Overhead & Profit 15 % 76,522.70

141
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Nilai HSPK : 586,675.00
2.01.02.01.06.002 1 m3 Lapis Pondasi Agregat Kelas B An.EI-512 m3 Nilai HSPK 1,232,180.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.009 OH 90,000 765.00
1.10.28.02.01.001.001 Mandor 0.001 OH 130,000 169.00
Jumlah Harga Tenaga Kerja 934.00
Bahan
1.1.7.01.01.01.005.00030 Batu Agregat Kelas B 1.259 m3 209,000 263,047.40
Jumlah Harga Bahan 263,047.40
Peralatan
9.1.2.09.03.01.001.00029 Wheel Loader 0.009 jam 708,250 6,020.13
9.1.2.08.01.01.001.00001 Dump Truck 1.591 jam 496,550 789,862.09
9.1.2.09.02.01.001.00006 Motor Grader 0.004 Jam 372,450 1,601.54
9.1.2.09.03.01.001.00019 Tandem Roller 0.005 jam 714,050 3,855.87
9.1.2.08.01.01.001.00005 Water Tanker 0.014 jam 435,400 6,139.14
Jumlah Harga Peralatan 807,478.76
Jumlah 1,071,460.16
Overhead & Profit 15 % 160,719.02

Nilai HSPK : 1,232,180.00


2.01.02.01.06.003 1 m3 Lapis Permukaan Agregat An.EI-521 m3 Nilai HSPK 912,100.00
Tanpa Penutup Aspal (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.009 OH 90,000 765.00
1.10.28.02.01.001.001 Mandor 0.001 OH 130,000 169.00
Jumlah Harga Tenaga Kerja 934.00
Bahan
1.1.7.01.01.01.005.00060 Agregat Pecah Kasar 1.259 m3 231,350 291,177.11
Jumlah Harga Bahan 291,177.11
Peralatan
9.1.2.09.03.01.001.00029 Wheel Loader 0.009 Jam 708,250 6,020.13
9.1.2.08.01.01.001.00001 Dump Truck 0.966 Jam 496,550 479,617.65
9.1.2.09.02.01.001.00006 Motor Grader 0.004 Jam 372,450 1,601.54
9.1.2.09.03.01.001.00019 Tandem Roller 0.011 Jam 714,050 7,640.34
9.1.2.08.01.01.001.00005 Water Tanker 0.014 Jam 435,400 6,139.14
Jumlah Harga Peralatan 501,018.78
Jumlah 793,129.89
Overhead & Profit 15 % 118,969.48

Nilai HSPK : 912,100.00


2.01.02.01.06.004 1 m3 Lapis Pondasi Semen Tanah An.EI-542 m3 Nilai HSPK 1,036,397.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.026 OH 90,000 2,295.00
1.10.28.02.01.001.001 Mandor 0.001 OH 130,000 169.00
Jumlah Harga Tenaga Kerja 2,464.00
Bahan
1.1.7.01.01.01.004.00005 Tanah Urug 1.200 m3 127,750 153,300.00
1.1.7.01.01.01.001.00016 Curing Membran (77 % Aspal + 33 % 1.333 liter 15,428 20,570.15
Kerosene)
1.1.7.01.01.01.005.00031 Batu Agregat Kelas C1 0.006 m3 162,550 926.54
Jumlah Harga Bahan 174,796.69
Peralatan
9.1.2.09.03.01.001.00029 Wheel Loader 0.009 Jam 708,250 6,020.13
9.1.2.08.01.01.001.00001 Dump Truck 1.422 Jam 496,550 706,094.10
9.1.2.09.02.01.001.00006 Motor Grader 0.004 Jam 372,450 1,601.54
9.1.2.09.03.01.001.00021 Vibro Roller 0.011 Jam 168,500 1,802.95
9.1.2.09.03.01.001.00016 P. Tyre Roller 0.004 Jam 240,300 865.08
9.1.2.08.01.01.001.00005 Water Tanker 0.014 Jam 435,400 6,139.14
9.1.2.09.03.01.001.00039 Fulvi Mixer 0.007 Jam 213,550 1,430.79
Jumlah Harga Peralatan 723,953.72
Jumlah 901,214.40

142
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Overhead & Profit 15 % 135,182.16

Nilai HSPK : 1,036,397.00


2.01.02.01.06.005 1 Ton Semen Untuk Lapis Pondasi An.EI-541 Ton Nilai HSPK 2,383,952.00
Semen Tanah (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.347 OH 90,000 31,257.00
1.10.28.02.01.001.001 Mandor 0.023 OH 130,000 3,016.00
Jumlah Harga Tenaga Kerja 34,273.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 1,050.000 Kg 1,306 1,371,464.33
Jumlah Harga Bahan 1,371,464.33
Peralatan
9.1.2.08.01.01.001.00001 Dump Truck 1.344 Jam 496,550 667,263.89
Jumlah Harga Peralatan 667,263.89
Jumlah 2,073,001.22
Overhead & Profit 15 % 310,950.18

Nilai HSPK : 2,383,952.00


2.01.02.01.06.006 1 m3 Lapis Pondasi Bawah Beton An.EI-533 m3 Nilai HSPK 1,775,707.00
Kurus (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.215 OH 90,000 19,368.00
1.10.28.02.01.001.006 Tukang Batu 0.057 OH 110,000 6,314.00
1.10.28.02.01.001.001 Mandor 0.014 OH 130,000 1,872.00
Jumlah Harga Tenaga Kerja 27,554.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 309.550 Kg 1,306 404,320.74
1.1.7.01.01.01.004.00001 Pasir Beton 0.499 m3 232,250 115,915.98
1.1.7.01.01.01.005.00060 Agregat Pecah Kasar 0.884 m3 231,350 204,444.00
1.1.7.01.01.05.007.00036 Multipleks Uk. 122 cm x 244 cm x 12 0.160 Lbr 255,450 40,872.00
mm
1.1.7.01.01.05.002.00038 Kayu Meranti, Begesting 0.096 m3 5,224,650 501,566.40
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.250 Kg 19,550 4,887.50
Jumlah Harga Bahan 1,272,006.61
Peralatan
9.1.2.09.03.01.001.00029 Wheel Loader 0.024 jam 708,250 17,281.30
9.1.2.09.03.01.001.00078 Batching Plant 0.050 jam 846,000 42,553.80
9.1.2.09.03.01.001.00079 Truck Mixer 0.195 jam 825,000 161,040.00
9.1.2.09.03.01.001.00009 Concrete Vibrator 0.050 jam 58,100 2,922.43
9.1.2.08.01.01.001.00005 Water Tanker 0.042 jam 435,400 18,373.88
9.1.2.09.03.01.001.00080 Conc. Paver 0.004 jam 638,000 2,360.60
Jumlah Harga Peralatan 244,532.01
Jumlah 1,544,092.62
Overhead & Profit 15 % 231,613.89

Nilai HSPK : 1,775,707.00


2.01.02.01.06.007 1 m3 Lapis Pondasi Atas Bersemen An.EI-551 m3 Nilai HSPK 1,010,915.00
(Cement Treated Base) (Ctb) (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.151 OH 90,000 13,563.00
1.10.28.02.01.001.006 Tukang Batu 0.043 OH 110,000 4,741.00
1.10.28.02.01.001.001 Mandor 0.022 OH 130,000 2,808.00
Jumlah Harga Tenaga Kerja 21,112.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 87.125 Kg 1,306 113,798.89
1.1.7.01.01.01.005.00060 Agregat Pecah Kasar 1.259 m3 231,350 291,177.11
Jumlah Harga Bahan 404,976.00
Peralatan
9.1.2.09.03.01.001.00029 Wheel Loader 0.024 jam 708,250 17,281.30
9.1.2.09.03.01.001.00078 Batching Plant 0.075 jam 846,000 63,703.80
9.1.2.08.01.01.001.00001 Dump Truck 0.710 jam 496,550 352,699.47
9.1.2.09.03.01.001.00021 Vibro Roller 0.005 jam 168,500 909.90

143
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
9.1.2.08.01.01.001.00005 Water Tanker 0.042 jam 435,400 18,373.88
Jumlah Harga Peralatan 452,968.35
Jumlah 879,056.34
Overhead & Profit 15 % 131,858.45

Nilai HSPK : 1,010,915.00


2.01.02.01.06.008 1 m3 Lapis Pondasi Bawah (Cement An.EI-552 m3 Nilai HSPK 1,049,409.00
Treated Sub Base) (Ctsb) (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.151 OH 90,000 13,563.00
1.10.28.02.01.001.006 Tukang Batu 0.043 OH 110,000 4,741.00
1.10.28.02.01.001.001 Mandor 0.022 OH 130,000 2,808.00
Jumlah Harga Tenaga Kerja 21,112.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 112.752 Kg 1,306 147,271.76
1.1.7.01.01.01.005.00060 Agregat Pecah Kasar 1.259 m3 231,350 291,177.11
Jumlah Harga Bahan 438,448.87
Peralatan
9.1.2.09.03.01.001.00029 Wheel Loader 0.024 jam 708,250 17,281.30
9.1.2.09.03.01.001.00078 Batching Plant 0.075 jam 846,000 63,703.80
9.1.2.08.01.01.001.00001 Dump Truck 0.710 jam 496,550 352,699.47
9.1.2.09.03.01.001.00021 Vibro Roller 0.005 jam 168,500 909.90
9.1.2.08.01.01.001.00005 Water Tanker 0.042 jam 435,400 18,373.88
Jumlah Harga Peralatan 452,968.35
Jumlah 912,529.21
Overhead & Profit 15 % 136,879.38

Nilai HSPK : 1,049,409.00


2.01.02.01.06.009 1 m3 Lapis Pondasi Agregat Tanpa An.EI-522 m3 Nilai HSPK 632,741.00
Penutup Aspal (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.009 OH 90,000 765.00
1.10.28.02.01.001.001 Mandor 0.001 OH 130,000 169.00
Jumlah Harga Tenaga Kerja 934.00
Bahan
1.1.7.01.01.01.005.00029 Batu Agregat Kelas A 1.259 m3 232,250 292,309.85
Jumlah Harga Bahan 292,309.85
Peralatan
9.1.2.09.03.01.001.00029 Wheel Loader 0.009 jam 708,250 6,020.13
9.1.2.08.01.01.001.00001 Dump Truck 0.486 jam 496,550 241,472.27
9.1.2.09.02.01.001.00006 Motor Grader 0.003 Jam 372,450 1,191.84
9.1.2.09.03.01.001.00019 Tandem Roller 0.003 jam 714,050 2,142.15
9.1.2.08.01.01.001.00005 Water Tanker 0.014 jam 435,400 6,139.14
Jumlah Harga Peralatan 256,965.52
Jumlah 550,209.37
Overhead & Profit 15 % 82,531.41

Nilai HSPK : 632,741.00


2.01.02.01.07 Pekerjaan Pekerasan Aspal (Divisi 6)

2.01.02.01.07.001 1 Liter Lapis Resap Pengikat-Aspal An.EI-611a Liter Nilai HSPK 14,677.00
Cair (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.000 OH 90,000 27.00
1.10.28.02.01.001.001 Mandor 0.000 OH 130,000 13.00
Jumlah Harga Tenaga Kerja 40.00
Bahan
1.1.7.01.01.01.001.00003 Aspal Panas AC 60/70 0.679 Kg 11,100 7,536.90
1.1.7.01.01.01.001.00015 Minyak Bakar 0.371 liter 13,650 5,061.42
Jumlah Harga Bahan 12,598.32
Peralatan
9.1.2.09.03.01.001.00077 Asphalt Distributor 0.000 Jam 470,000 94.00
9.1.2.09.03.01.001.00051 Compressor 0.000 Jam 151,100 30.22

144
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Jumlah Harga Peralatan 124.22
Jumlah 12,762.54
Overhead & Profit 15 % 1,914.38

Nilai HSPK : 14,677.00


2.01.02.01.07.002 1 Liter Lapis Perekat-Aspal Cair An.EI-611a Liter Nilai HSPK 14,257.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.000 OH 90,000 27.00
1.10.28.02.01.001.001 Mandor 0.000 OH 130,000 13.00
Jumlah Harga Tenaga Kerja 40.00
Bahan
1.1.7.01.01.01.001.00003 Aspal Panas AC 60/70 0.849 Kg 11,100 9,420.57
1.1.7.01.01.01.001.00015 Minyak Bakar 0.206 liter 13,650 2,811.90
Jumlah Harga Bahan 12,232.47
Peralatan
9.1.2.09.03.01.001.00077 Asphalt Distributor 0.000 Jam 470,000 94.00
9.1.2.09.03.01.001.00051 Compressor 0.000 Jam 151,100 30.22
Jumlah Harga Peralatan 124.22
Jumlah 12,396.69
Overhead & Profit 15 % 1,859.50

Nilai HSPK : 14,257.00


2.01.02.01.07.003 1 m2 Agregat Penutup Burtu An.EI-621 m2 Nilai HSPK 34,615.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.030 OH 90,000 2,736.00
1.10.28.02.01.001.001 Mandor 0.002 OH 130,000 208.00
Jumlah Harga Tenaga Kerja 2,944.00
Bahan
1.1.7.01.01.01.005.00031 Batu Agregat Kelas C1 0.012 m3 162,550 1,999.37
Jumlah Harga Bahan 1,999.37
Peralatan
9.1.2.09.03.01.001.00029 Wheel Loader 0.011 Jam 708,250 7,507.45
9.1.2.08.01.01.001.00001 Dump Truck 0.035 Jam 496,550 17,528.22
9.1.2.09.03.01.001.00016 P. Tyre Roller 0.001 Jam 240,300 120.15
Jumlah Harga Peralatan 25,155.82
Jumlah 30,099.18
Overhead & Profit 15 % 4,514.88

Nilai HSPK : 34,615.00


2.01.02.01.07.004 1 m2 Agregat Penutup Burda An.EI-622 m2 Nilai HSPK 55,469.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.051 OH 90,000 4,563.00
1.10.28.02.01.001.001 Mandor 0.003 OH 130,000 338.00
Jumlah Harga Tenaga Kerja 4,901.00
Bahan
1.1.7.01.01.01.005.00031 Batu Agregat Kelas C1 0.019 m3 162,550 3,023.43
Jumlah Harga Bahan 3,023.43
Peralatan
9.1.2.09.03.01.001.00029 Wheel Loader 0.018 Jam 708,250 12,536.03
9.1.2.08.01.01.001.00001 Dump Truck 0.055 Jam 496,550 27,508.87
9.1.2.09.03.01.001.00016 P. Tyre Roller 0.001 Jam 240,300 264.33
Jumlah Harga Peralatan 40,309.23
Jumlah 48,233.66
Overhead & Profit 15 % 7,235.05

Nilai HSPK : 55,469.00


2.01.02.01.07.005 1 Ton Latasir Kelas A (Ss-A) An.EI-631 Ton Nilai HSPK 2,040,521.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.020 OH 90,000 1,809.00
1.10.28.02.01.001.001 Mandor 0.003 OH 130,000 377.00

145
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Jumlah Harga Tenaga Kerja 2,186.00
Bahan
1.1.7.01.01.01.005.00028 Batu Agregat Kasar 0.209 m3 188,100 39,237.66
1.1.7.01.01.01.005.00027 Batu Agregat Halus 0.417 m3 162,550 67,799.61
1.1.7.01.01.01.002.00001 Semen Portland 31.500 Kg 1,306 41,143.93
1.1.7.01.01.01.001.00003 Aspal Panas AC 60/70 103.000 Kg 11,100 1,143,300.00
Jumlah Harga Bahan 1,291,481.19
Peralatan
9.1.2.09.03.01.001.00029 Wheel Loader 0.010 Jam 708,250 6,799.20
9.1.2.09.03.01.001.00001 Amp 0.020 Jam 8,127,200 163,356.72
9.1.2.10.04.01.001.00004 Genset 0.020 Jam 11,982,200 240,842.22
9.1.2.08.01.01.001.00001 Dump Truck 0.033 Jam 496,550 16,435.81
9.1.2.09.03.01.001.00004 Asphalt Finisher 0.039 Jam 725,650 28,010.09
9.1.2.09.03.01.001.00019 Tandem Roller 0.032 Jam 714,050 22,635.39
9.1.2.09.03.01.001.00016 P. Tyre Roller 0.011 Jam 240,300 2,619.27
Jumlah Harga Peralatan 480,698.69
Jumlah 1,774,365.88
Overhead & Profit 15 % 266,154.88

Nilai HSPK : 2,040,521.00


2.01.02.01.07.006 1 Ton Latasir Kelas B (Ss-B) An.EI-632 Ton Nilai HSPK 1,782,591.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.020 OH 90,000 1,809.00
1.10.28.02.01.001.001 Mandor 0.003 OH 130,000 377.00
Jumlah Harga Tenaga Kerja 2,186.00
Bahan
1.1.7.01.01.01.005.00028 Batu Agregat Kasar 0.014 m3 188,100 2,614.59
1.1.7.01.01.01.005.00027 Batu Agregat Halus 0.014 m3 162,550 2,259.45
1.1.7.01.01.01.002.00001 Semen Portland 31.500 Kg 1,306 41,143.93
1.1.7.01.01.01.001.00003 Aspal Panas AC 60/70 92.700 Kg 11,100 1,028,970.00
Jumlah Harga Bahan 1,074,987.96
Peralatan
9.1.2.09.03.01.001.00029 Wheel Loader 0.010 Jam 708,250 6,799.20
9.1.2.09.03.01.001.00001 Amp 0.020 Jam 8,127,200 163,356.72
9.1.2.10.04.01.001.00004 Genset 0.020 Jam 11,982,200 240,842.22
9.1.2.08.01.01.001.00001 Dump Truck 0.044 Jam 496,550 21,897.86
9.1.2.09.03.01.001.00004 Asphalt Finisher 0.029 Jam 725,650 21,043.85
9.1.2.09.03.01.001.00019 Tandem Roller 0.024 Jam 714,050 16,994.39
9.1.2.09.03.01.001.00016 P. Tyre Roller 0.008 Jam 240,300 1,970.46
Jumlah Harga Peralatan 472,904.70
Jumlah 1,550,078.66
Overhead & Profit 15 % 232,511.80

Nilai HSPK : 1,782,591.00


2.01.02.01.07.007 1 Ton Lataston Lapis Aus (Hrs-Wc) An.EI-633a Ton Nilai HSPK 2,329,344.00
(Gradasi Senjang/Semi Senjang) (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.019 OH 90,000 1,719.00
1.10.28.02.01.001.001 Mandor 0.003 OH 130,000 364.00
Jumlah Harga Tenaga Kerja 2,083.00
Bahan
1.1.7.01.01.01.005.00064 Agregat Lolos # 1 inch. 0.244 m3 210,000 51,240.00
1.1.7.01.01.01.005.00062 Agregat Pecah Mesin (0-5) 0.154 m3 217,200 33,405.36
1.1.7.01.01.01.005.00027 Batu Agregat Halus 0.248 m3 162,550 40,328.66
1.1.7.01.01.01.002.00001 Semen Portland 23.100 Kg 1,306 30,172.22
1.1.7.01.01.01.001.00003 Aspal Panas AC 60/70 75.190 Kg 11,100 834,609.00
Jumlah Harga Bahan 989,755.23
Peralatan
9.1.2.09.03.01.001.00029 Wheel Loader 0.010 Jam 708,250 6,799.20
9.1.2.09.03.01.001.00001 Amp 0.025 Jam 8,127,200 203,180.00
9.1.2.10.04.01.001.00004 Genset 0.025 Jam 11,982,200 299,555.00
9.1.2.08.01.01.001.00001 Dump Truck 1.003 Jam 496,550 498,039.65

146
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
9.1.2.09.03.01.001.00004 Asphalt Finisher 0.019 Jam 725,650 13,859.92
9.1.2.09.03.01.001.00019 Tandem Roller 0.016 Jam 714,050 11,210.59
9.1.2.09.03.01.001.00016 P. Tyre Roller 0.004 Jam 240,300 1,033.29
Jumlah Harga Peralatan 1,033,677.64
Jumlah 2,025,515.87
Overhead & Profit 15 % 303,827.38

Nilai HSPK : 2,329,344.00


2.01.02.01.07.008 1 Ton Lataston Lapis Aus Perata (Hrs- An.EI-633b Ton Nilai HSPK 2,216,027.00
Wc(L)) (Gradasi Senjang/Semi (dibulatkan) :
Senjang)
Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.019 OH 90,000 1,719.00
1.10.28.02.01.001.001 Mandor 0.003 OH 130,000 364.00
Jumlah Harga Tenaga Kerja 2,083.00
Bahan
1.1.7.01.01.01.005.00064 Agregat Lolos # 1 inch. 0.244 m3 210,000 51,240.00
1.1.7.01.01.01.005.00062 Agregat Pecah Mesin (0-5) 0.154 m3 217,200 33,405.36
1.1.7.01.01.01.005.00027 Batu Agregat Halus 0.248 m3 162,550 40,328.66
1.1.7.01.01.01.002.00001 Semen Portland 23.100 Kg 1,306 30,172.22
1.1.7.01.01.01.001.00003 Aspal Panas AC 60/70 75.190 Kg 11,100 834,609.00
Jumlah Harga Bahan 989,755.23
Peralatan
9.1.2.09.03.01.001.00029 Wheel Loader 0.010 Jam 708,250 6,799.20
9.1.2.09.03.01.001.00001 Amp 0.020 Jam 8,127,200 163,356.72
9.1.2.10.04.01.001.00004 Genset 0.020 Jam 11,982,200 240,842.22
9.1.2.08.01.01.001.00001 Dump Truck 1.003 Jam 496,550 498,039.65
9.1.2.09.03.01.001.00004 Asphalt Finisher 0.019 Jam 725,650 13,859.92
9.1.2.09.03.01.001.00019 Tandem Roller 0.016 Jam 714,050 11,210.59
9.1.2.09.03.01.001.00016 P. Tyre Roller 0.004 Jam 240,300 1,033.29
Jumlah Harga Peralatan 935,141.58
Jumlah 1,926,979.81
Overhead & Profit 15 % 289,046.97

Nilai HSPK : 2,216,027.00


2.01.02.01.07.009 1 Ton Lataston Lapis Pondasi (Hrs- An.EI-634a Ton Nilai HSPK 2,194,065.00
Base) (Gradasi Senjang/Semi (dibulatkan) :
Senjang)
Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.004 OH 90,000 369.00
1.10.28.02.01.001.001 Mandor 0.001 OH 130,000 78.00
Jumlah Harga Tenaga Kerja 447.00
Bahan
1.1.7.01.01.01.005.00064 Agregat Lolos # 1 inch. 0.296 m3 210,000 62,118.00
1.1.7.01.01.01.005.00062 Agregat Pecah Mesin (0-5) 0.137 m3 217,200 29,756.40
1.1.7.01.01.01.005.00027 Batu Agregat Halus 0.221 m3 162,550 35,907.30
1.1.7.01.01.01.002.00001 Semen Portland 15.750 Kg 1,306 20,571.96
1.1.7.01.01.01.001.00003 Aspal Panas AC 60/70 75.190 Kg 11,100 834,609.00
Jumlah Harga Bahan 982,962.66
Peralatan
9.1.2.09.03.01.001.00029 Wheel Loader 0.010 Jam 708,250 6,799.20
9.1.2.09.03.01.001.00001 Amp 0.020 Jam 8,127,200 163,356.72
9.1.2.10.04.01.001.00004 Genset 0.020 Jam 11,982,200 240,842.22
9.1.2.08.01.01.001.00001 Dump Truck 1.003 Jam 496,550 498,039.65
9.1.2.09.03.01.001.00004 Asphalt Finisher 0.004 Jam 725,650 2,975.17
9.1.2.09.03.01.001.00019 Tandem Roller 0.016 Jam 714,050 11,281.99
9.1.2.09.03.01.001.00016 P. Tyre Roller 0.005 Jam 240,300 1,177.47
Jumlah Harga Peralatan 924,472.42
Jumlah 1,907,882.07
Overhead & Profit 15 % 286,182.31

Nilai HSPK : 2,194,065.00

147
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
2.01.02.01.07.010 1 Ton Lataston Lapis Pondasi Perata An.EI-634b Ton Nilai HSPK 2,194,065.00
(Hrs-Base(L)) (Gradasi Senjang/Semi (dibulatkan) :
Senjang)

Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.004 OH 90,000 369.00
1.10.28.02.01.001.001 Mandor 0.001 OH 130,000 78.00
Jumlah Harga Tenaga Kerja 447.00
Bahan
1.1.7.01.01.01.005.00064 Agregat Lolos # 1 inch. 0.296 m3 210,000 62,118.00
1.1.7.01.01.01.005.00062 Agregat Pecah Mesin (0-5) 0.137 m3 217,200 29,756.40
1.1.7.01.01.01.005.00027 Batu Agregat Halus 0.221 m3 162,550 35,907.30
1.1.7.01.01.01.002.00001 Semen Portland 15.750 Kg 1,306 20,571.96
1.1.7.01.01.01.001.00003 Aspal Panas AC 60/70 75.190 Kg 11,100 834,609.00
Jumlah Harga Bahan 982,962.66
Peralatan
9.1.2.09.03.01.001.00029 Wheel Loader 0.010 Jam 708,250 6,799.20
9.1.2.09.03.01.001.00001 Amp 0.020 Jam 8,127,200 163,356.72
9.1.2.10.04.01.001.00004 Genset 0.020 Jam 11,982,200 240,842.22
9.1.2.08.01.01.001.00001 Dump Truck 1.003 Jam 496,550 498,039.65
9.1.2.09.03.01.001.00004 Asphalt Finisher 0.004 Jam 725,650 2,975.17
9.1.2.09.03.01.001.00019 Tandem Roller 0.016 Jam 714,050 11,281.99
9.1.2.09.03.01.001.00016 P. Tyre Roller 0.005 Jam 240,300 1,177.47
Jumlah Harga Peralatan 924,472.42
Jumlah 1,907,882.07
Overhead & Profit 15 % 286,182.31

Nilai HSPK : 2,194,065.00


2.01.02.01.07.011 1 Ton Laston Lapis Aus (Ac-Wc) An.EI-635a Ton Nilai HSPK 2,050,097.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.029 OH 90,000 2,583.00
1.10.28.02.01.001.001 Mandor 0.003 OH 130,000 377.00
Jumlah Harga Tenaga Kerja 2,960.00
Bahan
1.1.7.01.01.01.005.00065 Fraksi Lolos Scalping 0-37,5 Mm 0.298 m3 211,200 62,895.36
(Screen 0-37,5 Mm)
1.1.7.01.01.01.005.00062 Agregat Pecah Mesin (0-5) 0.352 m3 217,200 76,519.56
1.1.7.01.01.01.002.00001 Semen Portland 9.870 Kg 1,306 12,891.76
1.1.7.01.01.01.001.00003 Aspal Panas AC 60/70 62.830 Kg 11,100 697,413.00
Jumlah Harga Bahan 849,719.68
Peralatan
9.1.2.09.03.01.001.00029 Wheel Loader 0.010 Jam 708,250 6,799.20
9.1.2.09.03.01.001.00001 Amp 0.020 Jam 8,127,200 163,356.72
9.1.2.10.04.01.001.00004 Genset 0.020 Jam 11,982,200 240,842.22
9.1.2.08.01.01.001.00001 Dump Truck 1.003 Jam 496,550 498,039.65
9.1.2.09.03.01.001.00004 Asphalt Finisher 0.014 Jam 725,650 9,941.41
9.1.2.09.03.01.001.00019 Tandem Roller 0.014 Jam 714,050 9,639.68
9.1.2.09.03.01.001.00016 P. Tyre Roller 0.006 Jam 240,300 1,393.74
Jumlah Harga Peralatan 930,012.61
Jumlah 1,782,692.29
Overhead & Profit 15 % 267,403.84

Nilai HSPK : 2,050,097.00


2.01.02.01.07.012 1 Ton Laston Lapis Aus Perata (Ac- An.EI-635c Ton Nilai HSPK 2,050,097.00
Wc(L)) (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.029 OH 90,000 2,583.00
1.10.28.02.01.001.001 Mandor 0.003 OH 130,000 377.00
Jumlah Harga Tenaga Kerja 2,960.00
Bahan
1.1.7.01.01.01.005.00065 Fraksi Lolos Scalping 0-37,5 Mm 0.298 m3 211,200 62,895.36
(Screen 0-37,5 Mm)
1.1.7.01.01.01.005.00062 Agregat Pecah Mesin (0-5) 0.352 m3 217,200 76,519.56

148
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
1.1.7.01.01.01.002.00001 Semen Portland 9.870 Kg 1,306 12,891.76
1.1.7.01.01.01.001.00003 Aspal Panas AC 60/70 62.830 Kg 11,100 697,413.00
Jumlah Harga Bahan 849,719.68
Peralatan
9.1.2.09.03.01.001.00029 Wheel Loader 0.010 Jam 708,250 6,799.20
9.1.2.09.03.01.001.00001 Amp 0.020 Jam 8,127,200 163,356.72
9.1.2.10.04.01.001.00004 Genset 0.020 Jam 11,982,200 240,842.22
9.1.2.08.01.01.001.00001 Dump Truck 1.003 Jam 496,550 498,039.65
9.1.2.09.03.01.001.00004 Asphalt Finisher 0.014 Jam 725,650 9,941.41
9.1.2.09.03.01.001.00019 Tandem Roller 0.014 Jam 714,050 9,639.68
9.1.2.09.03.01.001.00016 P. Tyre Roller 0.006 Jam 240,300 1,393.74
Jumlah Harga Peralatan 930,012.61
Jumlah 1,782,692.29
Overhead & Profit 15 % 267,403.84

Nilai HSPK : 2,050,097.00


2.01.02.01.07.013 1 Ton Laston Lapis Antara (Ac-Bc) Ton Nilai HSPK 1,811,447.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.029 OH 90,000 2,583.00
1.10.28.02.01.001.001 Mandor 0.003 OH 130,000 377.00
Jumlah Harga Tenaga Kerja 2,960.00
Bahan
1.1.7.01.01.01.005.00065 Fraksi Lolos Scalping 0-37,5 Mm 0.348 m3 211,200 73,539.84
(Screen 0-37,5 Mm)
1.1.7.01.01.01.005.00062 Agregat Pecah Mesin (0-5) 0.313 m3 217,200 67,918.44
1.1.7.01.01.01.002.00001 Semen Portland 9.452 Kg 1,306 12,345.79
1.1.7.01.01.01.001.00003 Aspal Panas AC 60/70 57.680 Kg 11,100 640,248.00
Jumlah Harga Bahan 794,052.07
Peralatan
9.1.2.09.03.01.001.00029 Wheel Loader 0.010 Jam 708,250 6,799.20
9.1.2.09.03.01.001.00001 Amp 0.020 Jam 8,127,200 163,356.72
9.1.2.10.04.01.001.00004 Genset 0.020 Jam 11,982,200 240,842.22
9.1.2.08.01.01.001.00001 Dump Truck 0.705 Jam 496,550 350,266.37
9.1.2.09.03.01.001.00004 Asphalt Finisher 0.011 Jam 725,650 7,982.15
9.1.2.09.03.01.001.00019 Tandem Roller 0.011 Jam 714,050 7,783.15
9.1.2.09.03.01.001.00016 P. Tyre Roller 0.005 Jam 240,300 1,129.41
Jumlah Harga Peralatan 778,159.22
Jumlah 1,575,171.29
Overhead & Profit 15 % 236,275.69

Nilai HSPK : 1,811,447.00


2.01.02.01.07.014 1 Ton Laston Lapis Antara Perata (Ac- Ton Nilai HSPK 1,811,447.00
Bc(L)) (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.029 OH 90,000 2,583.00
1.10.28.02.01.001.001 Mandor 0.003 OH 130,000 377.00
Jumlah Harga Tenaga Kerja 2,960.00
Bahan
1.1.7.01.01.01.005.00065 Fraksi Lolos Scalping 0-37,5 Mm 0.348 m3 211,200 73,539.84
(Screen 0-37,5 Mm)
1.1.7.01.01.01.005.00062 Agregat Pecah Mesin (0-5) 0.313 m3 217,200 67,918.44
1.1.7.01.01.01.002.00001 Semen Portland 9.452 Kg 1,306 12,345.79
1.1.7.01.01.01.001.00003 Aspal Panas AC 60/70 57.680 Kg 11,100 640,248.00
Jumlah Harga Bahan 794,052.07
Peralatan
9.1.2.09.03.01.001.00029 Wheel Loader 0.010 Jam 708,250 6,799.20
9.1.2.09.03.01.001.00001 Amp 0.020 Jam 8,127,200 163,356.72
9.1.2.10.04.01.001.00004 Genset 0.020 Jam 11,982,200 240,842.22
9.1.2.08.01.01.001.00001 Dump Truck 0.705 Jam 496,550 350,266.37
9.1.2.09.03.01.001.00004 Asphalt Finisher 0.011 Jam 725,650 7,982.15
9.1.2.09.03.01.001.00019 Tandem Roller 0.011 Jam 714,050 7,783.15
9.1.2.09.03.01.001.00016 P. Tyre Roller 0.005 Jam 240,300 1,129.41
Jumlah Harga Peralatan 778,159.22

149
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Jumlah 1,575,171.29
Overhead & Profit 15 % 236,275.69

Nilai HSPK : 1,811,447.00


2.01.02.01.07.015 1 Ton Laston Lapis Pondasi (Ac-Base) Ton Nilai HSPK 1,705,906.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.029 OH 90,000 2,583.00
1.10.28.02.01.001.001 Mandor 0.003 OH 130,000 377.00
Jumlah Harga Tenaga Kerja 2,960.00
Bahan
1.1.7.01.01.01.005.00065 Fraksi Lolos Scalping 0-37,5 Mm 0.132 m3 211,200 27,815.04
(Screen 0-37,5 Mm)
1.1.7.01.01.01.005.00064 Agregat Lolos # 1 inch. 0.298 m3 210,000 62,622.00
1.1.7.01.01.01.005.00062 Agregat Pecah Mesin (0-5) 0.242 m3 217,200 52,497.24
1.1.7.01.01.01.002.00001 Semen Portland 9.976 Kg 1,306 13,030.22
1.1.7.01.01.01.001.00003 Aspal Panas AC 60/70 49.440 Kg 11,100 548,784.00
Jumlah Harga Bahan 704,748.50
Peralatan
9.1.2.09.03.01.001.00029 Wheel Loader 0.010 Jam 708,250 6,799.20
9.1.2.09.03.01.001.00001 Amp 0.020 Jam 8,127,200 163,356.72
9.1.2.10.04.01.001.00004 Genset 0.020 Jam 11,982,200 240,842.22
9.1.2.08.01.01.001.00001 Dump Truck 0.705 Jam 496,550 350,266.37
9.1.2.09.03.01.001.00004 Asphalt Finisher 0.009 Jam 725,650 6,675.98
9.1.2.09.03.01.001.00019 Tandem Roller 0.009 Jam 714,050 6,497.86
9.1.2.09.03.01.001.00016 P. Tyre Roller 0.005 Jam 240,300 1,249.56
Jumlah Harga Peralatan 775,687.91
Jumlah 1,483,396.40
Overhead & Profit 15 % 222,509.46

Nilai HSPK : 1,705,906.00


2.01.02.01.07.016 1 Ton Laston Lapis Pondasi Perata Ton Nilai HSPK 1,705,906.00
(Ac-Base(L)) (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.029 OH 90,000 2,583.00
1.10.28.02.01.001.001 Mandor 0.003 OH 130,000 377.00
Jumlah Harga Tenaga Kerja 2,960.00
Bahan
1.1.7.01.01.01.005.00065 Fraksi Lolos Scalping 0-37,5 Mm 0.132 m3 211,200 27,815.04
(Screen 0-37,5 Mm)
1.1.7.01.01.01.005.00064 Agregat Lolos # 1 inch. 0.298 m3 210,000 62,622.00
1.1.7.01.01.01.005.00062 Agregat Pecah Mesin (0-5) 0.242 m3 217,200 52,497.24
1.1.7.01.01.01.002.00001 Semen Portland 9.976 Kg 1,306 13,030.22
1.1.7.01.01.01.001.00003 Aspal Panas AC 60/70 49.440 Kg 11,100 548,784.00
Jumlah Harga Bahan 704,748.50
Peralatan
9.1.2.09.03.01.001.00029 Wheel Loader 0.010 Jam 708,250 6,799.20
9.1.2.09.03.01.001.00001 Amp 0.020 Jam 8,127,200 163,356.72
9.1.2.10.04.01.001.00004 Genset 0.020 Jam 11,982,200 240,842.22
9.1.2.08.01.01.001.00001 Dump Truck 0.705 Jam 496,550 350,266.37
9.1.2.09.03.01.001.00004 Asphalt Finisher 0.009 Jam 725,650 6,675.98
9.1.2.09.03.01.001.00019 Tandem Roller 0.009 Jam 714,050 6,497.86
9.1.2.09.03.01.001.00016 P. Tyre Roller 0.005 Jam 240,300 1,249.56
Jumlah Harga Peralatan 775,687.91
Jumlah 1,483,396.40
Overhead & Profit 15 % 222,509.46

Nilai HSPK : 1,705,906.00


2.01.02.01.07.017 1 m3 Campuran Aspal Dingin Untuk m3 Nilai HSPK 3,047,898.00
Pelapisan (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.143 OH 90,000 12,861.00
1.10.28.02.01.001.001 Mandor 0.012 OH 130,000 1,560.00
Jumlah Harga Tenaga Kerja 14,421.00

150
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Bahan
1.1.7.01.01.01.005.00062 Agregat Pecah Mesin (0-5) 1.349 m3 217,200 292,981.08
1.1.7.01.01.01.001.00005 Aspal Emulsi Curah 153.300 Kg 13,050 2,000,565.00
Jumlah Harga Bahan 2,293,546.08
Peralatan
9.1.2.09.03.01.001.00008 Conc. Mixer 0.083 jam 290,300 24,211.02
9.1.2.09.03.01.001.00019 Tandem Roller 0.024 jam 714,050 17,208.61
9.1.2.08.01.01.001.00001 Dump Truck 0.606 jam 496,550 300,958.96
Jumlah Harga Peralatan 342,378.58
Jumlah 2,650,345.66
Overhead & Profit 15 % 397,551.85

Nilai HSPK : 3,047,898.00


2.01.02.01.07.018 1 m3 Lapis Permukaan Penetrasi m3 Nilai HSPK 2,012,893.00
Macadam (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.020 OH 90,000 1,827.00
1.10.28.02.01.001.001 Mandor 0.002 OH 130,000 273.00
Jumlah Harga Tenaga Kerja 2,100.00
Bahan
1.1.7.01.01.01.005.00060 Agregat Pecah Kasar 1.669 m3 231,350 386,146.29
1.1.7.01.01.01.005.00062 Agregat Pecah Mesin (0-5) 0.148 m3 217,200 32,123.88
1.1.7.01.01.01.001.00003 Aspal Panas AC 60/70 98.586 Kg 11,100 1,094,302.38
Jumlah Harga Bahan 1,512,572.55
Peralatan
9.1.2.09.03.01.001.00029 Wheel Loader 0.007 Jam 708,250 5,028.58
9.1.2.08.01.01.001.00001 Dump Truck 0.349 Jam 496,550 173,345.61
9.1.2.09.03.01.001.00014 3-Wheel Roller 0.044 Jam 270,400 11,762.40
9.1.2.09.03.01.001.00002 Asp. Sprayer 0.379 Jam 120,200 45,531.76
Jumlah Harga Peralatan 235,668.34
Jumlah 1,750,340.89
Overhead & Profit 15 % 262,551.13

Nilai HSPK : 2,012,893.00


2.01.02.01.07.019 1 m3 Lapis Pondasi/Perata Penetrasi m3 Nilai HSPK 2,121,061.00
Macadam (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.020 OH 90,000 1,827.00
1.10.28.02.01.001.001 Mandor 0.002 OH 130,000 273.00
Jumlah Harga Tenaga Kerja 2,100.00
Bahan
1.1.7.01.01.01.005.00060 Agregat Pecah Kasar 1.775 m3 231,350 410,576.85
1.1.7.01.01.01.005.00062 Agregat Pecah Mesin (0-5) 0.247 m3 217,200 53,539.80
1.1.7.01.01.01.001.00003 Aspal Panas AC 60/70 103.000 Kg 11,100 1,143,300.00
Jumlah Harga Bahan 1,607,416.65
Peralatan
9.1.2.09.03.01.001.00029 Wheel Loader 0.007 Jam 708,250 5,028.58
9.1.2.08.01.01.001.00001 Dump Truck 0.349 Jam 496,550 173,345.61
9.1.2.09.03.01.001.00014 3-Wheel Roller 0.041 Jam 270,400 10,978.24
9.1.2.09.03.01.001.00002 Asp. Sprayer 0.379 Jam 120,200 45,531.76
Jumlah Harga Peralatan 234,884.18
Jumlah 1,844,400.83
Overhead & Profit 15 % 276,660.12

Nilai HSPK : 2,121,061.00


2.01.02.01.07.020 1 Liter Lapis Resap Pengikat-Aspal Liter Nilai HSPK 15,873.00
Emulsi (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.000 OH 90,000 27.00
1.10.28.02.01.001.001 Mandor 0.000 OH 130,000 13.00
Jumlah Harga Tenaga Kerja 40.00
Bahan
1.1.7.01.01.01.001.00005 Aspal Emulsi Curah 1.040 Kg 13,050 13,575.92
9.1.2.09.03.01.001.00077 Asphalt Distributor 0.000 Jam 470,000 141.00

151
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Jumlah Harga Bahan 13,716.92
Peralatan
9.1.2.09.03.01.001.00051 Compressor 0.000 Jam 151,100 45.33
Jumlah Harga Peralatan 45.33
Jumlah 13,802.25
Overhead & Profit 15 % 2,070.34

Nilai HSPK : 15,873.00


2.01.02.01.07.021 1 Liter Lapis Perekat-Aspal Emulsi Liter Nilai HSPK 9,278.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.000 OH 90,000 27.00
1.10.28.02.01.001.001 Mandor 0.000 OH 130,000 13.00
Jumlah Harga Tenaga Kerja 40.00
Bahan
1.1.7.01.01.01.001.00005 Aspal Emulsi Curah 0.520 Kg 13,050 6,788.61
1.1.7.01.01.01.022.00468 Air Tawar 1.000 Liter 150 150.00
Jumlah Harga Bahan 6,938.61
Peralatan
9.1.2.09.03.01.001.00077 Asphalt Distributor 0.000 Jam 470,000 141.00
9.1.2.09.03.01.001.00051 Compressor 0.000 Jam 151,100 45.33
9.1.2.09.03.01.001.00005 Asphalt Liquid Mixer 0.025 Jam 36,100 902.50
Jumlah Harga Peralatan 1,088.83
Jumlah 8,067.44
Overhead & Profit 15 % 1,210.12

Nilai HSPK : 9,278.00


2.01.02.01.07.022 1 Liter Bahan Aspal Untuk Pekerjaan Liter Nilai HSPK 13,757.00
Pelaburan (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.000 OH 90,000 27.00
1.10.28.02.01.001.001 Mandor 0.000 OH 130,000 13.00
Jumlah Harga Tenaga Kerja 40.00
Bahan
1.1.7.01.01.01.001.00003 Aspal Panas AC 60/70 0.976 Kg 11,100 10,834.71
1.1.7.01.01.01.001.00015 Minyak Bakar 0.066 Liter 13,650 900.90
Jumlah Harga Bahan 11,735.61
Peralatan
9.1.2.09.03.01.001.00077 Asphalt Distributor 0.000 Jam 470,000 141.00
9.1.2.09.03.01.001.00051 Compressor 0.000 Jam 151,100 45.33
Jumlah Harga Peralatan 186.33
Jumlah 11,961.94
Overhead & Profit 15 % 1,794.29

Nilai HSPK : 13,757.00


2.01.02.01.07.023 1 Liter Aspal Cair Emulsi Untuk Liter Nilai HSPK 33,535.00
Precoated (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.143 OH 90,000 12,861.00
1.10.28.02.01.001.001 Mandor 0.029 OH 130,000 3,718.00
Jumlah Harga Tenaga Kerja 16,579.00
Bahan
1.1.7.01.01.01.001.00003 Aspal Panas AC 60/70 0.976 Kg 11,100 10,834.71
1.1.7.01.01.01.001.00015 Minyak Bakar 0.066 liter 13,650 900.90
Jumlah Harga Bahan 11,735.61
Peralatan
9.1.2.09.03.01.001.00078 Batching Plant 0.001 Jam 846,000 846.00
Jumlah Harga Peralatan 846.00
Jumlah 29,160.61
Overhead & Profit 15 % 4,374.09

Nilai HSPK : 33,535.00


2.01.02.01.07.024 1 Liter Aspal Emulsi Untuk Precoated Liter Nilai HSPK 54,558.00
(dibulatkan) :

152
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.286 OH 90,000 25,722.00
1.10.28.02.01.001.001 Mandor 0.057 OH 130,000 7,436.00
Jumlah Harga Tenaga Kerja 33,158.00
Bahan
1.1.7.01.01.01.001.00005 Aspal Emulsi Curah 0.978 Kg 13,050 12,761.60
1.1.7.01.01.01.001.00015 Minyak Bakar 0.050 Liter 13,650 675.68
Jumlah Harga Bahan 13,437.27
Peralatan
9.1.2.09.03.01.001.00078 Batching Plant 0.001 Jam 846,000 846.00
Jumlah Harga Peralatan 846.00
Jumlah 47,441.27
Overhead & Profit 15 % 7,116.19

Nilai HSPK : 54,558.00


2.01.02.01.08 Pekerjaan Struktur (Divisi 7)
2.01.02.01.08.001 1 m3 Beton Mutu Tinggi Fc’=45 Mpa m3 Nilai HSPK 3,449,113.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.115 OH 90,000 10,332.00
1.10.28.02.01.001.006 Tukang Batu 0.258 OH 110,000 28,402.00
1.10.28.02.01.001.001 Mandor 0.014 OH 130,000 1,872.00
Jumlah Harga Tenaga Kerja 40,606.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 595.340 Kg 1,306 777,607.21
1.1.7.01.01.01.004.00001 Pasir Beton 0.435 m3 232,250 100,935.85
1.1.7.01.01.01.005.00060 Agregat Pecah Kasar 0.744 m3 231,350 172,124.40
1.1.7.01.01.05.002.00043 Kayu Perancah 0.400 m3 3,768,400 1,507,360.00
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 4.800 Kg 19,550 93,840.00
Jumlah Harga Bahan 2,651,867.46
Peralatan
9.1.2.09.03.01.001.00008 Conc. Mixer 0.101 jam 290,300 29,175.15
9.1.2.09.03.01.001.00079 Truck Mixer 0.316 jam 825,000 260,947.50
9.1.2.08.01.01.001.00005 Water Tanker 0.038 jam 435,400 16,632.28
Jumlah Harga Peralatan 306,754.93
Jumlah 2,999,228.39
Overhead & Profit 15 % 449,884.26

Nilai HSPK : 3,449,113.00


2.01.02.01.08.002 1 m3 Beton Mutu Tinggi Fc’=35 Mpa m3 Nilai HSPK 3,312,507.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.115 OH 90,000 10,332.00
1.10.28.02.01.001.006 Tukang Batu 0.258 OH 110,000 28,402.00
1.10.28.02.01.001.001 Mandor 0.014 OH 130,000 1,872.00
Jumlah Harga Tenaga Kerja 40,606.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 492.340 Kg 1,306 643,073.09
1.1.7.01.01.01.004.00001 Pasir Beton 0.502 m3 232,250 116,682.40
1.1.7.01.01.01.005.00060 Agregat Pecah Kasar 0.744 m3 231,350 172,124.40
1.1.7.01.01.05.002.00043 Kayu Perancah 0.400 m3 3,768,400 1,507,360.00
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 4.800 Kg 19,550 93,840.00
Jumlah Harga Bahan 2,533,079.89
Peralatan
9.1.2.09.03.01.001.00008 Conc. Mixer 0.101 jam 290,300 29,175.15
9.1.2.09.03.01.001.00079 Truck Mixer 0.316 jam 825,000 260,947.50
9.1.2.08.01.01.001.00005 Water Tanker 0.038 jam 435,400 16,632.28
Jumlah Harga Peralatan 306,754.93
Jumlah 2,880,440.82
Overhead & Profit 15 % 432,066.12

Nilai HSPK : 3,312,507.00


2.01.02.01.08.003 1 m3 Beton Mutu Sedang Fc’=30 m3 Nilai HSPK 3,309,955.00
Mpa (dibulatkan) :

153
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.115 OH 90,000 10,332.00
1.10.28.02.01.001.006 Tukang Batu 0.258 OH 110,000 28,402.00
1.10.28.02.01.001.001 Mandor 0.014 OH 130,000 1,872.00
Jumlah Harga Tenaga Kerja 40,606.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 469.680 Kg 1,306 613,475.58
1.1.7.01.01.01.004.00001 Pasir Beton 0.515 m3 232,250 119,492.63
1.1.7.01.01.01.005.00060 Agregat Pecah Kasar 0.744 m3 231,350 172,124.40
1.1.7.01.01.05.002.00043 Kayu Perancah 0.400 m3 3,768,400 1,507,360.00
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 3.200 Kg 19,550 62,560.00
Jumlah Harga Bahan 2,475,012.61
Peralatan
9.1.2.09.03.01.001.00078 Batching Plant 0.101 jam 846,000 85,023.00
9.1.2.09.03.01.001.00079 Truck Mixer 0.316 jam 825,000 260,947.50
9.1.2.08.01.01.001.00005 Water Tanker 0.038 jam 435,400 16,632.28
Jumlah Harga Peralatan 362,602.78
Jumlah 2,878,221.39
Overhead & Profit 15 % 431,733.21

Nilai HSPK : 3,309,955.00


2.01.02.01.08.004 1 m3 Beton Mutu Sedang Fc’= 25 m3 Nilai HSPK 2,329,043.00
Mpa (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.115 OH 90,000 10,332.00
1.10.28.02.01.001.006 Tukang Batu 0.158 OH 110,000 17,358.00
1.10.28.02.01.001.001 Mandor 0.014 OH 130,000 1,872.00
Jumlah Harga Tenaga Kerja 29,562.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 469.680 Kg 1,306 613,475.58
1.1.7.01.01.01.004.00001 Pasir Beton 0.510 m3 232,250 118,377.83
1.1.7.01.01.01.005.00060 Agregat Pecah Kasar 0.744 m3 231,350 172,124.40
1.1.7.01.01.05.002.00043 Kayu Perancah 0.200 m3 3,768,400 753,680.00
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 1.600 Kg 19,550 31,280.00
Jumlah Harga Bahan 1,688,937.81
Peralatan
9.1.2.09.03.01.001.00008 Conc. Mixer 0.101 jam 290,300 29,175.15
9.1.2.09.03.01.001.00079 Truck Mixer 0.316 jam 825,000 260,947.50
9.1.2.08.01.01.001.00005 Water Tanker 0.038 jam 435,400 16,632.28
Jumlah Harga Peralatan 306,754.93
Jumlah 2,025,254.74
Overhead & Profit 15 % 303,788.21

Nilai HSPK : 2,329,043.00


2.01.02.01.08.005 1 m3 Beton Mutu Sedang Fc’= 20 m3 Nilai HSPK 2,266,288.00
Mpa (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.115 OH 90,000 10,332.00
1.10.28.02.01.001.006 Tukang Batu 0.158 OH 110,000 17,358.00
1.10.28.02.01.001.001 Mandor 0.014 OH 130,000 1,872.00
Jumlah Harga Tenaga Kerja 29,562.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 422.300 Kg 1,306 551,589.89
1.1.7.01.01.01.004.00001 Pasir Beton 0.541 m3 232,250 125,693.70
1.1.7.01.01.01.005.00060 Agregat Pecah Kasar 0.744 m3 231,350 172,124.40
1.1.7.01.01.05.002.00043 Kayu Perancah 0.200 m3 3,768,400 753,680.00
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 1.600 Kg 19,550 31,280.00
Jumlah Harga Bahan 1,634,367.99
Peralatan
9.1.2.09.03.01.001.00008 Conc. Mixer 0.101 jam 290,300 29,175.15
9.1.2.09.03.01.001.00079 Truck Mixer 0.316 jam 825,000 260,947.50
9.1.2.08.01.01.001.00005 Water Tanker 0.038 jam 435,400 16,632.28
Jumlah Harga Peralatan 306,754.93
Jumlah 1,970,684.92

154
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Overhead & Profit 15 % 295,602.74

Nilai HSPK : 2,266,288.00


2.01.02.01.08.006 1 m3 Beton Mutu Rendah Fc’= 17,5 m3 Nilai HSPK 1,624,927.00
Mpa (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.195 OH 90,000 17,559.00
1.10.28.02.01.001.006 Tukang Batu 0.195 OH 110,000 21,461.00
1.10.28.02.01.001.001 Mandor 0.098 OH 130,000 12,688.00
Jumlah Harga Tenaga Kerja 51,708.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 327.540 Kg 1,306 427,818.50
1.1.7.01.01.01.004.00001 Pasir Beton 0.502 m3 232,250 116,682.40
1.1.7.01.01.01.005.00060 Agregat Pecah Kasar 0.905 m3 231,350 209,441.16
1.1.7.01.01.05.002.00043 Kayu Perancah 0.100 m3 3,768,400 376,840.00
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.800 Kg 19,550 15,640.00
Jumlah Harga Bahan 1,146,422.06
Peralatan
9.1.2.09.03.01.001.00008 Conc. Mixer 0.683 jam 290,300 198,216.84
9.1.2.08.01.01.001.00005 Water Tanker 0.038 jam 435,400 16,632.28
Jumlah Harga Peralatan 214,849.12
Jumlah 1,412,979.18
Overhead & Profit 15 % 211,946.88

Nilai HSPK : 1,624,927.00


2.01.02.01.08.007 1 m3 Beton Siklop Fc’=15 Mpa m3 Nilai HSPK 1,269,649.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 1.170 OH 90,000 105,336.00
1.10.28.02.01.001.006 Tukang Batu 0.098 OH 110,000 10,736.00
1.10.28.02.01.001.001 Mandor 0.098 OH 130,000 12,688.00
1.1.7.01.01.01.002.00001 Semen Portland 229.280 Kg 1,306 299,475.56
Jumlah Harga Tenaga Kerja 428,235.56
Bahan
1.1.7.01.01.01.004.00001 Pasir Beton 0.352 m3 232,250 81,682.33
1.1.7.01.01.01.005.00060 Agregat Pecah Kasar 0.634 m3 231,350 146,606.50
1.1.7.01.01.01.005.00004 Batu Pecah Uk. 3-5 cm 0.652 m3 296,100 192,997.98
Jumlah Harga Bahan 421,286.80
Peralatan
9.1.2.09.03.01.001.00008 Conc. Mixer 0.683 jam 290,300 198,216.84
9.1.2.08.01.01.001.00005 Water Tanker 0.038 jam 435,400 16,632.28
9.1.2.09.03.01.001.00009 Concrete Vibrator 0.683 jam 58,100 39,670.68
Jumlah Harga Peralatan 254,519.80
Jumlah 1,104,042.16
Overhead & Profit 15 % 165,606.32

Nilai HSPK : 1,269,649.00


2.01.02.01.08.008 1 m3 Beton Mutu Rendah Fc’= 10 m3 Nilai HSPK 1,376,873.00
Mpa (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.195 OH 90,000 17,559.00
1.10.28.02.01.001.006 Tukang Batu 0.195 OH 110,000 21,461.00
1.10.28.02.01.001.001 Mandor 0.098 OH 130,000 12,688.00
Jumlah Harga Tenaga Kerja 51,708.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 311.060 Kg 1,306 406,293.04
1.1.7.01.01.01.004.00001 Pasir Beton 0.511 m3 232,250 118,749.43
1.1.7.01.01.01.005.00060 Agregat Pecah Kasar 0.905 m3 231,350 209,441.16
1.1.7.01.01.05.002.00043 Kayu Perancah 0.050 m3 3,768,400 188,420.00
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.400 Kg 19,550 7,820.00
Jumlah Harga Bahan 930,723.62
Peralatan
9.1.2.09.03.01.001.00008 Conc. Mixer 0.683 jam 290,300 198,216.84
9.1.2.08.01.01.001.00005 Water Tanker 0.038 jam 435,400 16,632.28

155
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Jumlah Harga Peralatan 214,849.12
Jumlah 1,197,280.74
Overhead & Profit 15 % 179,592.11

Nilai HSPK : 1,376,873.00


2.01.02.01.08.009 1 Kg Anyaman Kawat Yang Dilas Kg Nilai HSPK 19,466.00
(Welded Wire Mesh) (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.030 OH 90,000 2,700.00
1.10.28.02.01.001.006 Tukang Batu 0.010 OH 110,000 1,100.00
1.10.28.02.01.001.001 Mandor 0.005 OH 130,000 650.00
Jumlah Harga Tenaga Kerja 4,450.00
Bahan
1.1.7.01.01.01.012.00006 Besi Beton Polos 1.100 Kg 11,050 12,155.00
1.1.7.01.01.05.001.00017 Kawat Ikat (Bendrat) Besi Uk. 0,1 cm 0.001 Roll 402,000 321.60
x 25 Kg
Jumlah Harga Bahan 12,476.60
Peralatan
Jumlah Harga Peralatan
Jumlah 16,926.60
Overhead & Profit 15 % 2,538.99

Nilai HSPK : 19,466.00


2.01.02.01.08.010 1 Kg Pemasangan Jembatan Rangka Kg Nilai HSPK 4,316.00
Baja (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.002 OH 90,000 207.00
1.10.28.02.01.001.006 Tukang Batu 0.001 OH 110,000 66.00
1.10.28.02.01.001.001 Mandor 0.000 OH 130,000 26.00
Jumlah Harga Tenaga Kerja 299.00
Bahan
1.1.7.01.01.05.002.00043 Kayu Perancah 0.000 m3 3,768,400 753.68
Jumlah Harga Bahan 753.68
Peralatan
9.1.2.09.03.01.001.00024 Crane On Track 0.001 jam 3,000,000 2,700.00
Jumlah Harga Peralatan 2,700.00
Jumlah 3,752.68
Overhead & Profit 15 % 562.90

Nilai HSPK : 4,316.00


2.01.02.01.09 Pekerjaan Pengembalian Kondisi
Dan Pekerjaan Minor (Divisi 8)

2.01.02.01.09.001 1 m3 Pondasi Agregat Kls. A Untuk m3 Nilai HSPK 964,879.00


Pekerjaan Minor (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.025 OH 90,000 2,286.00
1.10.28.02.01.001.001 Mandor 0.001 OH 130,000 143.00
Jumlah Harga Tenaga Kerja 2,429.00
Bahan
1.1.7.01.01.01.005.00060 Agregat Pecah Kasar 1.259 m3 231,350 291,200.25
Jumlah Harga Bahan 291,200.25
Peralatan
9.1.2.09.03.01.001.00029 Wheel Loader 0.007 jam 708,250 5,028.58
9.1.2.08.01.01.001.00001 Dump Truck 1.070 jam 496,550 531,060.23
9.1.2.09.03.01.001.00012 Pedestrian Roller 0.053 jam 60,100 3,167.27
9.1.2.08.01.01.001.00005 Water Tanker 0.014 jam 435,400 6,139.14
Jumlah Harga Peralatan 545,395.21
Jumlah 839,024.46
Overhead & Profit 15 % 125,853.67

Nilai HSPK : 964,879.00


2.01.02.01.09.002 1 m3 Pondasi Agregat Kls. B Untuk m3 Nilai HSPK 963,823.00
Pekerjaan Minor (dibulatkan) :

156
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.015 OH 90,000 1,368.00
1.10.28.02.01.001.001 Mandor 0.001 OH 130,000 143.00
Jumlah Harga Tenaga Kerja 1,511.00
Bahan
1.1.7.01.01.01.005.00060 Agregat Pecah Kasar 1.259 m3 231,350 291,200.25
Jumlah Harga Bahan 291,200.25
Peralatan
9.1.2.09.03.01.001.00029 Wheel Loader 0.007 jam 708,250 5,028.58
9.1.2.08.01.01.001.00001 Dump Truck 1.070 jam 496,550 531,060.23
9.1.2.09.03.01.001.00012 Pedestrian Roller 0.053 jam 60,100 3,167.27
9.1.2.08.01.01.001.00005 Water Tanker 0.014 jam 435,400 6,139.14
Jumlah Harga Peralatan 545,395.21
Jumlah 838,106.46
Overhead & Profit 15 % 125,715.97

Nilai HSPK : 963,823.00


2.01.02.01.09.003 1 m3 Agregat Utk. Lapis Pond. Jalan- m3 Nilai HSPK 494,812.00
Tanpa Penutup Aspal Utk. Pek. (dibulatkan) :
Minor
Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.018 OH 90,000 1,647.00
1.10.28.02.01.001.001 Mandor 0.001 OH 130,000 169.00
Jumlah Harga Tenaga Kerja 1,816.00
Bahan
1.1.7.01.01.01.005.00060 Agregat Pecah Kasar 1.200 m3 231,350 277,620.00
Jumlah Harga Bahan 277,620.00
Peralatan
9.1.2.09.03.01.001.00029 Wheel Loader 0.009 Jam 708,250 6,020.13
9.1.2.08.01.01.001.00001 Dump Truck 0.273 Jam 496,550 135,508.50
9.1.2.09.03.01.001.00012 Pedestrian Roller 0.053 Jam 60,100 3,167.27
9.1.2.08.01.01.001.00005 Water Tanker 0.014 Jam 435,400 6,139.14
Jumlah Harga Peralatan 150,835.03
Jumlah 430,271.03
Overhead & Profit 15 % 64,540.65

Nilai HSPK : 494,812.00


2.01.02.01.09.004 1 m3 Waterbound Macadam Utk. m3 Nilai HSPK 395,430.00
Pekerjaan Minor (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.023 OH 90,000 2,106.00
1.10.28.02.01.001.001 Mandor 0.002 OH 130,000 195.00
Jumlah Harga Tenaga Kerja 2,301.00
Bahan
1.1.7.01.01.01.005.00060 Agregat Pecah Kasar 0.935 m3 231,350 216,312.25
1.1.7.01.01.01.005.00062 Agregat Pecah Mesin (0-5) 0.165 m3 217,200 35,838.00
Jumlah Harga Bahan 252,150.25
Peralatan
9.1.2.09.03.01.001.00029 Wheel Loader 0.010 Jam 708,250 7,224.15
9.1.2.08.01.01.001.00001 Dump Truck 0.151 Jam 496,550 74,929.40
9.1.2.09.03.01.001.00014 3-Wheel Roller 0.027 Jam 270,400 7,246.72
Jumlah Harga Peralatan 89,400.27
Jumlah 343,851.52
Overhead & Profit 15 % 51,577.73

Nilai HSPK : 395,430.00


2.01.02.01.09.005 1 m3 Lapis Pondasi Agregat Kelas S m3 Nilai HSPK 868,487.00
Untuk Pekerjaan Minor (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.009 OH 90,000 765.00
1.10.28.02.01.001.001 Mandor 0.001 OH 130,000 169.00
Jumlah Harga Tenaga Kerja 934.00
Bahan

157
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
1.1.7.01.01.01.005.00027 Batu Agregat Halus 1.259 m3 162,550 204,601.69
Jumlah Harga Bahan 204,601.69
Peralatan
9.1.2.09.03.01.001.00029 Wheel Loader 0.009 jam 708,250 6,020.13
9.1.2.08.01.01.001.00001 Dump Truck 1.072 jam 496,550 532,053.33
9.1.2.09.02.01.001.00006 Motor Grader 0.004 Jam 372,450 1,601.54
9.1.2.09.03.01.001.00019 Tandem Roller 0.005 jam 714,050 3,855.87
9.1.2.08.01.01.001.00005 Water Tanker 0.014 jam 435,400 6,139.14
Jumlah Harga Peralatan 549,670.00
Jumlah 755,205.68
Overhead & Profit 15 % 113,280.85

Nilai HSPK : 868,487.00


2.01.02.01.09.006 1 m3 Camp. Aspal Panas Utk. Pek. m3 Nilai HSPK 4,171,440.00
Minor (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.158 OH 90,000 14,256.00
1.10.28.02.01.001.001 Mandor 0.016 OH 130,000 2,067.00
Jumlah Harga Tenaga Kerja 16,323.00
Bahan
1.1.7.01.01.01.005.00060 Agregat Pecah Kasar 0.773 m3 231,350 178,856.69
1.1.7.01.01.01.005.00062 Agregat Pecah Mesin (0-5) 0.527 m3 217,200 114,486.12
1.1.7.01.01.01.001.00014 Filler 25.300 Kg 2,150 54,395.00
1.1.7.01.01.01.001.00003 Aspal Panas AC 60/70 156.975 Kg 11,100 1,742,422.50
Jumlah Harga Bahan 2,090,160.31
Peralatan
9.1.2.09.03.01.001.00029 Wheel Loader 0.030 Jam 708,250 21,389.15
9.1.2.09.03.01.001.00001 Amp 0.056 Jam 8,127,200 451,059.60
9.1.2.10.04.01.001.00004 Genset 0.056 Jam 11,982,200 665,012.10
9.1.2.08.01.01.001.00001 Dump Truck 0.748 Jam 496,550 371,518.71
9.1.2.09.03.01.001.00012 Pedestrian Roller 0.198 Jam 60,100 11,875.76
Jumlah Harga Peralatan 1,520,855.32
Jumlah 3,627,338.63
Overhead & Profit 15 % 544,100.79

Nilai HSPK : 4,171,440.00


2.01.02.01.09.007 1 m3 Penetrasi Macadam Utk. Pek. m3 Nilai HSPK 2,011,331.00
Minor (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.024 OH 90,000 2,187.00
1.10.28.02.01.001.001 Mandor 0.003 OH 130,000 325.00
Jumlah Harga Tenaga Kerja 2,512.00
Bahan
1.1.7.01.01.01.005.00060 Agregat Pecah Kasar 1.756 m3 231,350 406,158.06
1.1.7.01.01.01.001.00003 Aspal Panas AC 60/70 99.273 Kg 11,100 1,101,928.08
Jumlah Harga Bahan 1,508,086.14
Peralatan
9.1.2.09.03.01.001.00029 Wheel Loader 0.009 Jam 708,250 6,090.95
9.1.2.08.01.01.001.00001 Dump Truck 0.453 Jam 496,550 224,788.19
9.1.2.09.03.01.001.00014 3-Wheel Roller 0.012 Jam 270,400 3,190.72
9.1.2.09.03.01.001.00002 Asp. Sprayer 0.036 Jam 120,200 4,315.18
Jumlah Harga Peralatan 238,385.04
Jumlah 1,748,983.18
Overhead & Profit 15 % 262,347.48

Nilai HSPK : 2,011,331.00


2.01.02.01.09.008 1 m3 Camp. Aspal Dingin Utk. Pek. m3 Nilai HSPK 2,841,016.00
Minor (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.165 OH 90,000 14,877.00
1.10.28.02.01.001.001 Mandor 0.028 OH 130,000 3,588.00
Jumlah Harga Tenaga Kerja 18,465.00
Bahan
1.1.7.01.01.01.005.00062 Agregat Pecah Mesin (0-5) 1.168 m3 217,200 253,776.48

158
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
1.1.7.01.01.01.001.00005 Aspal Emulsi Curah 140.700 Kg 13,050 1,836,135.00
Jumlah Harga Bahan 2,089,911.48
Peralatan
9.1.2.09.03.01.001.00008 Conc. Mixer 0.096 jam 290,300 27,984.92
9.1.2.09.03.01.001.00012 Pedestrian Roller 0.198 jam 60,100 11,875.76
9.1.2.08.01.01.001.00001 Dump Truck 0.649 jam 496,550 322,211.30
Jumlah Harga Peralatan 362,071.98
Jumlah 2,470,448.46
Overhead & Profit 15 % 370,567.27

Nilai HSPK : 2,841,016.00


2.01.02.01.09.009 1 Liter Residu Bitumen Untuk Liter Nilai HSPK 15,249.00
Pek.Minor (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.001 OH 90,000 45.00
1.10.28.02.01.001.001 Mandor 0.000 OH 130,000 13.00
Jumlah Harga Tenaga Kerja 58.00
Bahan
1.1.7.01.01.01.001.00003 Aspal Panas AC 60/70 0.986 Kg 11,100 10,942.38
1.1.7.01.01.01.001.00015 Minyak Bakar 0.143 Liter 13,650 1,951.95
Jumlah Harga Bahan 12,894.33
Peralatan
9.1.2.09.03.01.001.00002 Asp. Sprayer 0.000 Jam 120,200 48.08
9.1.2.09.03.01.001.00051 Compressor 0.000 Jam 151,100 60.44
9.1.2.08.01.01.001.00001 Dump Truck 0.000 Jam 496,550 198.62
Jumlah Harga Peralatan 307.14
Jumlah 13,259.47
Overhead & Profit 15 % 1,988.92

Nilai HSPK : 15,249.00


2.01.02.01.09.010 1 Bh Patok Pengarah Buah Nilai HSPK 240,243.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.168 OH 90,000 15,084.00
1.10.28.02.01.001.006 Tukang Batu 0.084 OH 110,000 9,218.00
1.10.28.02.01.001.001 Mandor 0.021 OH 130,000 2,730.00
Jumlah Harga Tenaga Kerja 27,032.00
Bahan
2.01.02.01.08.006 Beton K-175 0.036 m3 1,624,927.00 57,684.91
1.1.7.01.01.01.012.00006 Besi Beton Polos 4.651 Kg 11,050 51,395.76
Jumlah Harga Bahan 109,080.67
Peralatan
9.1.2.08.01.01.001.00001 Dump Truck 0.147 Jam 496,550 72,794.23
Jumlah Harga Peralatan 72,794.23
Jumlah 208,906.90
Overhead & Profit 15 % 31,336.03

Nilai HSPK : 240,243.00


2.01.02.01.09.011 1 Bh Patok Kilometer Buah Nilai HSPK 638,637.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.118 OH 90,000 10,611.00
1.10.28.02.01.001.006 Tukang Batu 0.047 OH 110,000 5,192.00
1.10.28.02.01.001.001 Mandor 0.024 OH 130,000 3,068.00
Jumlah Harga Tenaga Kerja 18,871.00
Bahan
2.01.02.01.08.006 Beton K-175 0.151 m3 1,624,927.00 245,688.96
1.1.7.01.01.01.012.00006 Besi Beton Polos 18.900 Kg 11,050 208,845.00
Jumlah Harga Bahan 454,533.96
Peralatan
9.1.2.08.01.01.001.00001 Dump Truck 0.165 Jam 496,550 81,930.75
Jumlah Harga Peralatan 81,930.75
Jumlah 555,335.71
Overhead & Profit 15 % 83,300.36

159
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f

Nilai HSPK : 638,637.00


2.01.02.01.09.012 1 Bh Patok Hektometer Buah Nilai HSPK 333,720.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.118 OH 90,000 10,611.00
1.10.28.02.01.001.006 Tukang Batu 0.047 OH 110,000 5,192.00
1.10.28.02.01.001.001 Mandor 0.024 OH 130,000 3,068.00
Jumlah Harga Tenaga Kerja 18,871.00
Bahan
2.01.02.01.08.006 Beton K-175 0.063 m3 1,624,927.00 102,370.40
1.1.7.01.01.01.012.00006 Besi Beton Polos 7.875 Kg 11,050 87,018.75
Jumlah Harga Bahan 189,389.15
Peralatan
9.1.2.08.01.01.001.00001 Dump Truck 0.165 Jam 496,550 81,930.75
Jumlah Harga Peralatan 81,930.75
Jumlah 290,190.90
Overhead & Profit 15 % 43,528.64

Nilai HSPK : 333,720.00


2.01.02.01.09.013 1 Bh Paku Jalan Buah Nilai HSPK 364,286.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.250 OH 90,000 22,500.00
1.10.28.02.01.001.006 Tukang Batu 0.100 OH 110,000 11,000.00
1.10.28.02.01.001.001 Mandor 0.050 OH 130,000 6,500.00
Jumlah Harga Tenaga Kerja 40,000.00
Bahan
2.01.02.01.08.006 Beton K-175 0.063 m3 1,624,927.00 102,370.40
1.3.2.18.01.01.003.00189 Paku Jalan Bentuk Bulat 1.000 Set 174,400 174,400.00
Jumlah Harga Bahan 276,770.40
Peralatan
Jumlah Harga Peralatan
Jumlah 316,770.40
Overhead & Profit 15 % 47,515.56

Nilai HSPK : 364,286.00


2.01.02.01.10 Biaya Pemakaian Alat Berat
2.01.02.01.10.001 1 Jam Pemakaian Asphalt Mixing Jam Nilai HSPK 9,346,280.00
Plant (dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.09.03.01.001.00001 Amp 1.000 Jam 8,127,200 8,127,200.00
Jumlah Harga Peralatan 8,127,200.00
Jumlah 8,127,200.00
Overhead & Profit 15 % 1,219,080.00

Nilai HSPK : 9,346,280.00


2.01.02.01.10.002 1 Jam Pemakaian Asphalt Finisher Jam Nilai HSPK 834,498.00
(dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.09.03.01.001.00004 Asphalt Finisher 1.000 Jam 725,650 725,650.00
Jumlah Harga Peralatan 725,650.00
Jumlah 725,650.00
Overhead & Profit 15 % 108,847.50

Nilai HSPK : 834,498.00

160
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
2.01.02.01.10.003 1 Jam Pemakaian Asphalt Sprayer Jam Nilai HSPK 138,230.00
(dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.09.03.01.001.00002 Asp. Sprayer 1.000 Jam 120,200 120,200.00
Jumlah Harga Peralatan 120,200.00
Jumlah 120,200.00
Overhead & Profit 15 % 18,030.00

Nilai HSPK : 138,230.00


2.01.02.01.10.004 1 Jam Pemakaian Bulldozer 100-150 Jam Nilai HSPK 483,000.00
Hp (dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.09.02.01.001.00001 Bulldozer 1.000 Jam 420,000 420,000.00
Jumlah Harga Peralatan 420,000.00
Jumlah 420,000.00
Overhead & Profit 15 % 63,000.00

Nilai HSPK : 483,000.00


2.01.02.01.10.005 1 Jam Pemakaian Compressor 4000- Jam Nilai HSPK 173,765.00
6500 L\M (dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.09.03.01.001.00051 Compressor 1.000 Jam 151,100 151,100.00
Jumlah Harga Peralatan 151,100.00
Jumlah 151,100.00
Overhead & Profit 15 % 22,665.00

Nilai HSPK : 173,765.00


2.01.02.01.10.006 1 Jam Pemakaian Concrete Mixer Jam Nilai HSPK 333,845.00
0.3-0.6 m3 (dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.09.03.01.001.00008 Conc. Mixer 1.000 Jam 290,300 290,300.00
Jumlah Harga Peralatan 290,300.00
Jumlah 290,300.00
Overhead & Profit 15 % 43,545.00

Nilai HSPK : 333,845.00


2.01.02.01.10.007 1 Jam Pemakaian Crane 10-15 Ton Jam Nilai HSPK 3,450,000.00
(dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.09.03.01.001.00024 Crane 10-15 Ton 1.000 Jam 3,000,000 3,000,000.00
Jumlah Harga Peralatan 3,000,000.00
Jumlah 3,000,000.00
Overhead & Profit 15 % 450,000.00

161
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Nilai HSPK : 3,450,000.00
2.01.02.01.10.008 1 Jam Pemakaian Dump Truck 3.5 Jam Nilai HSPK 571,033.00
Ton (dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.08.01.01.001.00001 Dump Truck 1.000 Jam 496,550 496,550.00
Jumlah Harga Peralatan 496,550.00
Jumlah 496,550.00
Overhead & Profit 15 % 74,482.50

Nilai HSPK : 571,033.00


2.01.02.01.10.009 1 Jam Pemakaian Dump Truck 10 Jam Nilai HSPK 713,748.00
Ton (dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.08.01.01.001.00002 Dump Truck 10 Ton 1.000 Jam 620,650 620,650.00
Jumlah Harga Peralatan 620,650.00
Jumlah 620,650.00
Overhead & Profit 15 % 93,097.50

Nilai HSPK : 713,748.00


2.01.02.01.10.010 1 Jam Pemakaian Excavator 80 - 140 Jam Nilai HSPK 941,333.00
HP; 0,8 m3 80-140 Hp (dibulatkan) :

Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.09.01.01.001.00001 Excavator 1.000 Jam 818,550 818,550.00
Jumlah Harga Peralatan 818,550.00
Jumlah 818,550.00
Overhead & Profit 15 % 122,782.50

Nilai HSPK : 941,333.00


2.01.02.01.10.011 1 Jam Pemakaian Flat Bed Truck 3-4 Jam Nilai HSPK 400,603.00
m3 (dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.08.01.01.001.00053 Flat Bed Truck 1.000 Jam 348,350 348,350.00
Jumlah Harga Peralatan 348,350.00
Jumlah 348,350.00
Overhead & Profit 15 % 52,252.50

Nilai HSPK : 400,603.00


2.01.02.01.10.012 1 Jam Pemakaian Generator Set Jam Nilai HSPK 13,779,530.00
(dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.10.04.01.001.00004 Genset 1.000 Jam 11,982,200 11,982,200.00
Jumlah Harga Peralatan 11,982,200.00
Jumlah 11,982,200.00

162
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Overhead & Profit 15 % 1,797,330.00

Nilai HSPK : 13,779,530.00


2.01.02.01.10.013 1 Jam Pemakaian Motor Grader Jam Nilai HSPK 428,318.00
>100 Hp (dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.09.02.01.001.00006 Motor Grader 1.000 Jam 372,450 372,450.00
Jumlah Harga Peralatan 372,450.00
Jumlah 372,450.00
Overhead & Profit 15 % 55,867.50

Nilai HSPK : 428,318.00


2.01.02.01.10.014 1 Jam Pemakaian Track Loader 75- Jam Nilai HSPK 642,390.00
100 Hp (dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.09.03.01.001.00030 Track Loader 75-100 Hp 1.000 Jam 558,600 558,600.00
Jumlah Harga Peralatan 558,600.00
Jumlah 558,600.00
Overhead & Profit 15 % 83,790.00

Nilai HSPK : 642,390.00


2.01.02.01.10.015 1 Jam Pemakaian Wheel Loader 1.0- Jam Nilai HSPK 814,488.00
1.6 m3 (dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.09.03.01.001.00029 Wheel Loader 1.000 Jam 708,250 708,250.00
Jumlah Harga Peralatan 708,250.00
Jumlah 708,250.00
Overhead & Profit 15 % 106,237.50

Nilai HSPK : 814,488.00


2.01.02.01.10.016 1 Jam Pemakaian Three Wheel Jam Nilai HSPK 310,960.00
Roller 6-8 T (dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.09.03.01.001.00014 3-Wheel Roller 1.000 Jam 270,400 270,400.00
Jumlah Harga Peralatan 270,400.00
Jumlah 270,400.00
Overhead & Profit 15 % 40,560.00

Nilai HSPK : 310,960.00


2.01.02.01.10.017 1 Jam Pemakaian Tandem Roller 6-8 Jam Nilai HSPK 821,158.00
T. (dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.09.03.01.001.00019 Tandem Roller 1.000 Jam 714,050 714,050.00
Jumlah Harga Peralatan 714,050.00

163
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Jumlah 714,050.00
Overhead & Profit 15 % 107,107.50

Nilai HSPK : 821,158.00


2.01.02.01.10.018 1 Jam Pemakaian Tire Roller 8-10 T. Jam Nilai HSPK 276,345.00
(dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.09.03.01.001.00016 P. Tyre Roller 1.000 Jam 240,300 240,300.00
Jumlah Harga Peralatan 240,300.00
Jumlah 240,300.00
Overhead & Profit 15 % 36,045.00

Nilai HSPK : 276,345.00


2.01.02.01.10.019 1 Jam Pemakaian Vibratory Roller 5- Jam Nilai HSPK 193,775.00
8 T. (dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.09.03.01.001.00021 Vibro Roller 1.000 Jam 168,500 168,500.00
Jumlah Harga Peralatan 168,500.00
Jumlah 168,500.00
Overhead & Profit 15 % 25,275.00

Nilai HSPK : 193,775.00


2.01.02.01.10.020 1 Jam Pemakaian Concrete Vibrator Jam Nilai HSPK 66,815.00
(dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.09.03.01.001.00009 Concrete Vibrator 1.000 Jam 58,100 58,100.00
Jumlah Harga Peralatan 58,100.00
Jumlah 58,100.00
Overhead & Profit 15 % 8,715.00

Nilai HSPK : 66,815.00


2.01.02.01.10.021 1 Jam Pemakaian Stone Crusher Jam Nilai HSPK 802,298.00
(dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.09.03.01.001.00033 Stone Crusher 1.000 Jam 697,650 697,650.00
Jumlah Harga Peralatan 697,650.00
Jumlah 697,650.00
Overhead & Profit 15 % 104,647.50

Nilai HSPK : 802,298.00


2.01.02.01.10.022 1 Jam Pemakaian Water Pump 70- Jam Nilai HSPK 41,400.00
100 Mm (dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.09.03.01.001.00047 Water Pump 70-100 Mm 1.000 Jam 36,000 36,000.00

164
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Jumlah Harga Peralatan 36,000.00
Jumlah 36,000.00
Overhead & Profit 15 % 5,400.00

Nilai HSPK : 41,400.00


2.01.02.01.10.023 1 Jam Pemakaian Water Tanker Jam Nilai HSPK 500,710.00
3000-4500 L. (dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.08.01.01.001.00005 Water Tanker 1.000 Jam 435,400 435,400.00
Jumlah Harga Peralatan 435,400.00
Jumlah 435,400.00
Overhead & Profit 15 % 65,310.00

Nilai HSPK : 500,710.00


2.01.02.01.10.024 1 Jam Pemakaian Pedestrian Roller Jam Nilai HSPK 69,115.00
(dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.09.03.01.001.00012 Pedestrian Roller 1.000 Jam 60,100 60,100.00
Jumlah Harga Peralatan 60,100.00
Jumlah 60,100.00
Overhead & Profit 15 % 9,015.00

Nilai HSPK : 69,115.00


2.01.02.01.10.025 1 Jam Pemakaian Tamper Jam Nilai HSPK 44,160.00
(dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.09.03.01.001.00018 Stamper 1.000 Jam 38,400 38,400.00
Jumlah Harga Peralatan 38,400.00
Jumlah 38,400.00
Overhead & Profit 15 % 5,760.00

Nilai HSPK : 44,160.00


2.01.02.01.10.026 1 Jam Pemakaian Jack Hammer Jam Nilai HSPK 42,895.00
(dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.09.03.01.001.00040 Jack Hammer 1.000 Jam 37,300 37,300.00
Jumlah Harga Peralatan 37,300.00
Jumlah 37,300.00
Overhead & Profit 15 % 5,595.00

Nilai HSPK : 42,895.00


2.01.02.01.10.027 1 Jam Pemakaian Fulvi Mixer Jam Nilai HSPK 245,583.00
(dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
Jumlah Harga Bahan
Peralatan

165
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
9.1.2.09.03.01.001.00039 Fulvi Mixer 1.000 Jam 213,550 213,550.00
Jumlah Harga Peralatan 213,550.00
Jumlah 213,550.00
Overhead & Profit 15 % 32,032.50

Nilai HSPK : 245,583.00


2.01.02.01.10.028 1 Jam Pemakaian Concrete Pump Jam Nilai HSPK 4,673,140.00
(dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.09.03.01.001.00010 Concrete Pump 1.000 Jam 4,063,600 4,063,600.00
Jumlah Harga Peralatan 4,063,600.00
Jumlah 4,063,600.00
Overhead & Profit 15 % 609,540.00

Nilai HSPK : 4,673,140.00


2.01.02.01.10.029 1 Jam Pemakaian Trailer 20 Ton Jam Nilai HSPK 776,250.00
(dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.09.03.01.001.00082 Trailer 20 Ton 1.000 Jam 675,000 675,000.00
Jumlah Harga Peralatan 675,000.00
Jumlah 675,000.00
Overhead & Profit 15 % 101,250.00

Nilai HSPK : 776,250.00


2.01.02.01.10.030 1 Jam Pemakaian Pile Driver + Jam Nilai HSPK 296,988.00
Hammer (dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.09.03.01.001.00042 Pile Driver + Hammer 1.000 Jam 258,250 258,250.00
Jumlah Harga Peralatan 258,250.00
Jumlah 258,250.00
Overhead & Profit 15 % 38,737.50

Nilai HSPK : 296,988.00


2.01.02.01.10.031 1 Jam Pemakaian Crane On Track 35 Jam Nilai HSPK 3,450,000.00
Ton (dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.09.03.01.001.00024 Crane On Track 1.000 Jam 3,000,000 3,000,000.00
Jumlah Harga Peralatan 3,000,000.00
Jumlah 3,000,000.00
Overhead & Profit 15 % 450,000.00

Nilai HSPK : 3,450,000.00


2.01.02.01.10.032 1 Jam Pemakaian Welding Set Jam Nilai HSPK 115,483.00
(dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
Jumlah Harga Bahan

166
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Peralatan
9.1.2.09.03.01.001.00083 Sewa Alat Pengelasan 1.000 Jam 100,420 100,420.00
Jumlah Harga Peralatan 100,420.00
Jumlah 100,420.00
Overhead & Profit 15 % 15,063.00

Nilai HSPK : 115,483.00


2.01.02.01.10.033 1 Jam Pemakaian Bore Pile Machine Jam Nilai HSPK 1,022,753.00
(dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.09.03.01.001.00035 Bore Pile Machine 1.000 Jam 889,350 889,350.00
Jumlah Harga Peralatan 889,350.00
Jumlah 889,350.00
Overhead & Profit 15 % 133,402.50

Nilai HSPK : 1,022,753.00


2.01.02.01.10.034 1 Jam Pemakaian Asphalt Liquid Jam Nilai HSPK 41,515.00
Mixer (dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.09.03.01.001.00005 Asphalt Liquid Mixer 1.000 Jam 36,100 36,100.00
Jumlah Harga Peralatan 36,100.00
Jumlah 36,100.00
Overhead & Profit 15 % 5,415.00

Nilai HSPK : 41,515.00


2.01.02.01.10.035 1 Jam Pemakaian Tronton Jam Nilai HSPK 420,699.00
(dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.09.03.01.001.00084 Tronton 1.000 Jam 365,825 365,825.00
Jumlah Harga Peralatan 365,825.00
Jumlah 365,825.00
Overhead & Profit 15 % 54,873.75

Nilai HSPK : 420,699.00


2.01.02.01.10.036 1 Jam Pemakaian Cold Milling Jam Nilai HSPK 712,368.00
(dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.09.03.01.001.00036 Cold Milling 1.000 Jam 619,450 619,450.00
Jumlah Harga Peralatan 619,450.00
Jumlah 619,450.00
Overhead & Profit 15 % 92,917.50

Nilai HSPK : 712,368.00


2.01.02.01.10.037 1 Jam Pemakaian Rock Drill Breaker Jam Nilai HSPK 410,527.00
(dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan

167
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Jumlah Harga Bahan
Peralatan
9.1.2.09.03.01.001.00085 Rock Drill Breaker 1.000 Jam 356,980 356,979.81
Jumlah Harga Peralatan 356,979.81
Jumlah 356,979.81
Overhead & Profit 15 % 53,546.97

Nilai HSPK : 410,527.00


2.01.02.01.10.038 1 Jam Pemakaian Cold Recycler Jam Nilai HSPK 9,041,769.00
(dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.09.03.01.001.00086 Cold Recycler 1.000 Jam 7,862,407.50 7,862,407.50
Jumlah Harga Peralatan 7,862,407.50
Jumlah 7,862,407.50
Overhead & Profit 15 % 1,179,361.12

Nilai HSPK : 9,041,769.00


2.01.02.01.10.039 1 Jam Pemakaian Hot Recycler Jam Nilai HSPK 10,437,073.00
(dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.09.03.01.001.00087 Hot Recycler 1.000 Jam 9,075,714.83 9,075,714.83
Jumlah Harga Peralatan 9,075,714.83
Jumlah 9,075,714.83
Overhead & Profit 15 % 1,361,357.22

Nilai HSPK : 10,437,073.00


2.01.02.01.10.040 1 Jam Pemakaian Aggregat (Chip) Jam Nilai HSPK 764,688.00
Spreader (dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.09.03.01.001.00088 Aggregat (Chip) Spreader 1.000 Jam 664,945.73 664,945.73
Jumlah Harga Peralatan 664,945.73
Jumlah 664,945.73
Overhead & Profit 15 % 99,741.86

Nilai HSPK : 764,688.00


2.01.02.01.10.041 1 Jam Pemakaian Asphalt Distributor Jam Nilai HSPK 540,500.00
(dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.09.03.01.001.00077 Asphalt Distributor 1.000 Jam 470,000 470,000.00
Jumlah Harga Peralatan 470,000.00
Jumlah 470,000.00
Overhead & Profit 15 % 70,500.00

Nilai HSPK : 540,500.00


2.01.02.01.10.042 1 Jam Pemakaian Slip Form Paver Jam Nilai HSPK 733,700.00
(dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja

168
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.09.03.01.001.00080 Concrete Paver 1.000 Jam 638,000 638,000.00
Jumlah Harga Peralatan 638,000.00
Jumlah 638,000.00
Overhead & Profit 15 % 95,700.00

Nilai HSPK : 733,700.00


2.01.02.01.10.043 1 Jam Pemakaian Concrete Pan Jam Nilai HSPK 972,900.00
Mixer (dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.09.03.01.001.00078 Batching Plant 1.000 Jam 846,000 846,000.00
Jumlah Harga Peralatan 846,000.00
Jumlah 846,000.00
Overhead & Profit 15 % 126,900.00

Nilai HSPK : 972,900.00


2.01.02.01.10.044 1 Jam Pemakaian Concrete Breaker Jam Nilai HSPK 1,284,128.00
(dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.09.03.01.001.00089 Concrete Breaker 1.000 Jam 1,116,632.38 1,116,632.38
Jumlah Harga Peralatan 1,116,632.38
Jumlah 1,116,632.38
Overhead & Profit 15 % 167,494.86

Nilai HSPK : 1,284,128.00


2.01.02.01.10.045 1 Jam Pemakaian Aspahlt Tanker Jam Nilai HSPK 843,149.00
(dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.09.03.01.001.00090 Asphalt Tanker 1.000 Jam 733,172.51 733,172.51
Jumlah Harga Peralatan 733,172.51
Jumlah 733,172.51
Overhead & Profit 15 % 109,975.88

Nilai HSPK : 843,149.00


2.01.02.01.10.046 1 Jam Pemakaian Cement Tanker Jam Nilai HSPK 775,069.00
(dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.09.03.01.001.00091 Cement Tanker 1.000 Jam 673,972.51 673,972.51
Jumlah Harga Peralatan 673,972.51
Jumlah 673,972.51
Overhead & Profit 15 % 101,095.88

Nilai HSPK : 775,069.00


2.01.02.01.10.047 1 Jam Pemakaian Condrete Mixer Jam Nilai HSPK 333,845.00
(350) (dibulatkan) :
Tenaga Kerja

169
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Jumlah Harga Tenaga Kerja
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.09.03.01.001.00008 Condrete Mixer (350) 1.000 Jam 290,300 290,300.00
Jumlah Harga Peralatan 290,300.00
Jumlah 290,300.00
Overhead & Profit 15 % 43,545.00

Nilai HSPK : 333,845.00


2.01.02.01.10.048 1 Jam Pemakaian Vibrating Rammer Jam Nilai HSPK 59,153.00
(dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.09.03.01.001.00092 Vibrating Rammer 1.000 Jam 51,436.78 51,436.78
Jumlah Harga Peralatan 51,436.78
Jumlah 51,436.78
Overhead & Profit 15 % 7,715.52

Nilai HSPK : 59,153.00


2.01.02.01.10.049 1 Jam Pemakaian Truk Mixer Jam Nilai HSPK 948,750.00
(Agitator) (dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.09.03.01.001.00079 Truck Mixer 1.000 Jam 825,000 825,000.00
Jumlah Harga Peralatan 825,000.00
Jumlah 825,000.00
Overhead & Profit 15 % 123,750.00

Nilai HSPK : 948,750.00


2.01.02.01.10.050 1 Jam Pemakaian Bore Pile Machine Jam Nilai HSPK 1,022,753.00
(dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.09.03.01.001.00035 Bore Pile Machine 1.000 Jam 889,350 889,350.00
Jumlah Harga Peralatan 889,350.00
Jumlah 889,350.00
Overhead & Profit 15 % 133,402.50

Nilai HSPK : 1,022,753.00


2.01.02.01.10.051 1 Jam Pemakaian Crane On Track 75- Jam Nilai HSPK 3,450,000.00
100 Ton (dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.09.03.01.001.00024 Crane On Track 75-100 Ton 1.000 Jam 3,000,000 3,000,000.00
Jumlah Harga Peralatan 3,000,000.00
Jumlah 3,000,000.00
Overhead & Profit 15 % 450,000.00

Nilai HSPK : 3,450,000.00


2.01.02.01.10.052 1 Jam Pemakaian Blending Jam Nilai HSPK 205,620.00
Equipment (dibulatkan) :

170
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.09.03.01.001.00076 Blending Equipment 1.000 Jam 178,800 178,800.00
Jumlah Harga Peralatan 178,800.00
Jumlah 178,800.00
Overhead & Profit 15 % 26,820.00

Nilai HSPK : 205,620.00


2.01.02.01.10.053 1 Jam Pemakaian Asphalt Liquid Jam Nilai HSPK 41,515.00
Mixer (dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.09.03.01.001.00005 Asphalt Liquid Mixer 20.000 Liter 1.000 Jam 36,100 36,100.00
Jumlah Harga Peralatan 36,100.00
Jumlah 36,100.00
Overhead & Profit 15 % 5,415.00

Nilai HSPK : 41,515.00


2.01.02.02 I. PEKERJAAN PENGAIRAN
2.01.02.02.01 Pekerjaan Pembersihan Dan
Persiapan
2.01.02.02.01.001 1 m2 pekerjaan pekerjaan m2 Nilai HSPK 7,107.00
pembersihan stripping/kosrekan (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.006 O.H 130,000 780.00
1.10.28.02.01.002.001 Pekerja 0.060 O.H 90,000 5,400.00
Jumlah Harga Tenaga Kerja 6,180.00
Bahan
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
Jumlah 6,180.00
Overhead & Profit 15 % 927.00

Nilai HSPK : 7,107.00


2.01.02.02.01.002 1m2 tebas tebang berupa dan m2 Nilai HSPK 9,041.00
membersihkan lokasi dari (dibulatkan) :
tanaman/tumbuhan diameter < 15
cm
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.0075 O.H 130,000 975.00
1.10.28.02.01.002.001 Pekerja 0.075 O.H 90,000 6,750.00
Jumlah Harga Tenaga Kerja 7,725.00
Bahan
1.1.7.01.01.01.001.00015 Minyak Bakar 0.010 Liter 13,650 136.50
Jumlah Harga Bahan 136.50
Peralatan
Jumlah Harga Peralatan
Jumlah 7,861.50
Overhead & Profit 15 % 1,179.23

Nilai HSPK : 9,041.00


2.01.02.02.01.003 Mencabut 1 tunggul pohon tanaman Buah Nilai HSPK 29,038.00
keras dia. >15 cm dan membuang (dibulatkan) :
sisa tunggul kayu dan akar-akarnya

Tenaga Kerja

171
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
1.10.28.02.01.001.001 Mandor 0.020 O.H 130,000 2,600.00
1.10.28.02.01.002.001 Pekerja 0.200 O.H 90,000 18,000.00
Jumlah Harga Tenaga Kerja 20,600.00
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.09.03.01.001.00057 Chainsaw 0.100 Unit/ hari 46,500 4,650.00
Jumlah Harga Peralatan 4,650.00
Jumlah 25,250.00
Overhead & Profit 15 % 3,787.50

Nilai HSPK : 29,038.00


2.01.02.02.01.004 1 m2 pekerjaan Gebalan Rumput m2 Nilai HSPK 48,594.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.010 O.H 130,000 1,300.00
1.10.28.02.01.002.001 Pekerja 0.100 O.H 90,000 9,000.00
Jumlah Harga Tenaga Kerja 10,300.00
Bahan
1.3.5.05.01.01.006.00137 Gebalan Rumput 1.100 m2 29,050 31,955.00
Jumlah Harga Bahan 31,955.00
Peralatan
Jumlah Harga Peralatan
Jumlah 42,255.00
Overhead & Profit 15 % 6,338.25

Nilai HSPK : 48,594.00


2.01.02.02.01.005 1 m2 pekerjaan pembabatan rumput m2 Nilai HSPK 1,856.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.00125 O.H 130,000 162.50
1.10.28.02.01.002.001 Pekerja 0.0125 O.H 90,000 1,125.00
Jumlah Harga Tenaga Kerja 1,287.50
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.09.03.01.001.00075 Mesin Pemotong Rumput Gendong 0.007 Unit/hari 46,600 326.20
(Chainsaw)
Jumlah Harga Peralatan 326.20
Jumlah 1,613.70
Overhead & Profit 15 % 242.06

Nilai HSPK : 1,856.00


2.01.02.02.01.006 1m¹ uitset trase saluran m' Nilai HSPK 3,427.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.019 Juru ukur 0.004 O.H 100,000 400.00
1.10.28.02.01.002.001 Pembantu Juru Ukur 0.004 O.H 90,000 360.00
1.10.28.02.01.002.001 Pekerja 0.012 O.H 90,000 1,080.00
Jumlah Harga Tenaga Kerja 1,840.00
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.09.03.01.001.00050 Sewa Waterpass 0.004 Unit / Hari 6,250 25.00
9.1.2.09.03.01.001.00049 Sewa Alat Ukur Theodolit 0.004 Unit / Hari 278,600 1,114.40
Jumlah Harga Peralatan 1,139.40
Jumlah 2,979.40
Overhead & Profit 15 % 446.91

Nilai HSPK : 3,427.00


2.01.02.02.01.007 Pasang 1 m' profil melintang galian m' Nilai HSPK 45,370.00
tanah (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.006 O.H 130,000 780.00

172
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
1.10.28.02.01.001.004 Tukang Kayu 0.020 O.H 110,000 2,200.00
1.10.28.02.01.002.001 Pekerja 0.060 O.H 90,000 5,400.00
1.10.28.02.01.001.019 Juru ukur 0.020 O.H 100,000 2,000.00
1.10.28.02.01.002.001 Pembantu Juru Ukur 0.020 O.H 90,000 1,800.00
Jumlah Harga Tenaga Kerja 12,180.00
Bahan
1.1.7.01.01.05.002.00039 Kaso 0.0025 m3 3,483,100 8,707.75
1.1.7.01.01.05.002.00039 Papan 0.0042 m3 3,483,100 14,629.02
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.200 Kg 19,550 3,910.00
Jumlah Harga Bahan 27,246.77
Peralatan
9.1.2.09.03.01.001.00050 Sewa Waterpass 0.004 Unit/hari 6,250 25.00
Jumlah Harga Peralatan 25.00
Jumlah 39,451.77
Overhead & Profit 15 % 5,917.77

Nilai HSPK : 45,370.00


2.01.02.02.02 Pekerjaan Pengerukan
2.01.02.02.02.001 1 m3 Pengerukan Saluran (manual) m3 Nilai HSPK 215,721.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.095 O.H 130,000 12,350.00
1.10.28.02.01.002.001 Pekerja 1.716 O.H 90,000 154,440.00
1.1.7.01.01.01.020.00001 Glangsing 4.000 Buah 3,050 12,200.00
Jumlah Harga Tenaga Kerja 178,990.00
Bahan
1.1.7.01.03.01.016.00018 Tali Rafia Bentul, 1 Kg 0.360 Buah 21,800 7,848.00
Jumlah Harga Bahan 7,848.00
Peralatan
9.1.2.08.01.01.001.00012 Mobil Pick Up Dalam Kota 0.002 Unit/Hari 372,450 744.90
Jumlah Harga Peralatan 744.90
Jumlah 187,582.90
Overhead & Profit 15 % 28,137.44

Nilai HSPK : 215,721.00


2.01.02.02.02.002 1 m3 Pengerukan Saluran (alat m3 Nilai HSPK 171,348.00
berat) (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.007 O.H 130,000 910.00
1.10.28.02.01.002.001 Pekerja 0.226 O.H 90,000 20,340.00
Jumlah Harga Tenaga Kerja 21,250.00
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.08.01.01.001.00001 Dump Truck 0.010 Jam 496,550 4,965.50
9.1.2.09.01.01.001.00001 Excavator 0.150 Jam 818,550 122,782.50
Jumlah Harga Peralatan 127,748.00
Jumlah 148,998.00
Overhead & Profit 15 % 22,349.70

Nilai HSPK : 171,348.00


2.01.02.02.02.003 1 m3 Pengerukan dan Pembuangan m3 Nilai HSPK 215,721.00
Wallet (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.095 O.H 130,000 12,350.00
1.10.28.02.01.002.001 Pekerja 1.716 O.H 90,000 154,440.00
Jumlah Harga Tenaga Kerja 166,790.00
Bahan
1.1.7.01.01.01.020.00001 Glangsing 4.000 Buah 3,050 12,200.00
1.1.7.01.03.01.016.00018 Tali Rafia Bentul, 1 Kg 0.360 Buah 21,800 7,848.00
Jumlah Harga Bahan 20,048.00
Peralatan
9.1.2.08.01.01.001.00012 Mobil Pick Up Dalam Kota 0.002 Unit/Hari 372,450 744.90
Jumlah Harga Peralatan 744.90

173
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Jumlah 187,582.90
Overhead & Profit 15 % 28,137.44

Nilai HSPK : 215,721.00


2.01.02.02.02.004 1 m3 pekerjaan pengangkutan m3 Nilai HSPK 27,522.00
material/ hasil galian sejauh 3 m s/d (dibulatkan) :
5m

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.012 O.H 130,000 1,612.00
1.10.28.02.01.002.001 Pekerja 0.248 O.H 90,000 22,320.00
Jumlah Harga Tenaga Kerja 23,932.00
Bahan
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
Jumlah 23,932.00
Overhead & Profit 15 % 3,589.80

Nilai HSPK : 27,522.00


2.01.02.02.02.005 1 m3 pekerjaan pengangkutan m3 Nilai HSPK 29,742.00
material/ hasil galian sejauh 5 m (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.013 O.H 130,000 1,742.00
1.10.28.02.01.002.001 Pekerja 0.268 O.H 90,000 24,120.00
Jumlah Harga Tenaga Kerja 25,862.00
Bahan
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
Jumlah 25,862.00
Overhead & Profit 15 % 3,879.30

Nilai HSPK : 29,742.00


2.01.02.02.02.006 1 m3 pekerjaan pengangkutan m3 Nilai HSPK 31,739.00
material/ hasil galian sejauh 10 m (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.014 O.H 130,000 1,859.00
1.10.28.02.01.002.001 Pekerja 0.286 O.H 90,000 25,740.00
Jumlah Harga Tenaga Kerja 27,599.00
Bahan
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
Jumlah 27,599.00
Overhead & Profit 15 % 4,139.85

Nilai HSPK : 31,739.00


2.01.02.02.02.007 1 m3 pekerjaan pengangkutan m3 Nilai HSPK 39,508.00
material/ hasil galian sejauh 30 m (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.018 O.H 130,000 2,314.00
1.10.28.02.01.002.001 Pekerja 0.356 O.H 90,000 32,040.00
Jumlah Harga Tenaga Kerja 34,354.00
Bahan
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
Jumlah 34,354.00
Overhead & Profit 15 % 5,153.10

174
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Nilai HSPK : 39,508.00
2.01.02.02.02.008 1 m3 Pekerjaan Pengangkutan m3 Nilai HSPK 46,832.00
Material Ke Lokasi Sejauh 50 m (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.021 O.H 130,000 2,743.00
1.10.28.02.01.002.001 Pekerja 0.422 O.H 90,000 37,980.00
Jumlah Harga Tenaga Kerja 40,723.00
Bahan
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
Jumlah 40,723.00
Overhead & Profit 15 % 6,108.45

Nilai HSPK : 46,832.00


2.01.02.02.02.009 1 m3 Pekerjaan Pengangkutan m3 Nilai HSPK 66,585.00
Material Ke Lokasi Sejauh 100 m (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.030 O.H 130,000 3,900.00
1.10.28.02.01.002.001 Pekerja 0.600 O.H 90,000 54,000.00
Jumlah Harga Tenaga Kerja 57,900.00
Bahan
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
Jumlah 57,900.00
Overhead & Profit 15 % 8,685.00

Nilai HSPK : 66,585.00


2.01.02.02.02.010 1 m3 Pekerjaan Pengangkutan m3 Nilai HSPK 105,427.00
Material Ke Lokasi Sejauh 200 m (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.048 O.H 130,000 6,175.00
1.10.28.02.01.002.001 Pekerja 0.950 O.H 90,000 85,500.00
Jumlah Harga Tenaga Kerja 91,675.00
Bahan
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
Jumlah 91,675.00
Overhead & Profit 15 % 13,751.25

Nilai HSPK : 105,427.00


2.01.02.02.02.011 1 m3 Pekerjaan Pengangkutan m3 Nilai HSPK 144,268.00
Material Ke Lokasi Sejauh 300 m (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.065 O.H 130,000 8,450.00
1.10.28.02.01.002.001 Pekerja 1.300 O.H 90,000 117,000.00
Jumlah Harga Tenaga Kerja 125,450.00
Bahan
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
Jumlah 125,450.00
Overhead & Profit 15 % 18,817.50

Nilai HSPK : 144,268.00


2.01.02.02.02.012 1 m3 Pekerjaan Pengangkutan m3 Nilai HSPK 183,109.00
Material Ke Lokasi Sejauh 400 m (dibulatkan) :

175
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.083 O.H 130,000 10,725.00
1.10.28.02.01.002.001 Pekerja 1.650 O.H 90,000 148,500.00
Jumlah Harga Tenaga Kerja 159,225.00
Bahan
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
Jumlah 159,225.00
Overhead & Profit 15 % 23,883.75

Nilai HSPK : 183,109.00


2.01.02.02.02.013 1 m3 Pekerjaan Pengangkutan m3 Nilai HSPK 216,402.00
Material Ke Lokasi Sejauh 500 m (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.098 O.H 130,000 12,675.00
1.10.28.02.01.002.001 Pekerja 1.950 O.H 90,000 175,500.00
Jumlah Harga Tenaga Kerja 188,175.00
Bahan
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
Jumlah 188,175.00
Overhead & Profit 15 % 28,226.25

Nilai HSPK : 216,402.00


2.01.02.02.02.014 1 m3 pekerjaan pengangkutan m3 Nilai HSPK 39,064.00
material kelokasi sejauh > 500 m, (dibulatkan) :
untuk setiap kenaikan 100 m

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.018 O.H 130,000 2,288.00
1.10.28.02.01.002.001 Pekerja 0.352 O.H 90,000 31,680.00
Jumlah Harga Tenaga Kerja 33,968.00
Bahan
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
Jumlah 33,968.00
Overhead & Profit 15 % 5,095.20

Nilai HSPK : 39,064.00


2.01.02.02.02.015 1 m3 Pekerjaan angkutan material/ m3 Nilai HSPK 60,701.00
sisa galian sejauh 1 km (dengan (dibulatkan) :
dump truck)
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.08.01.01.001.00001 Dump Truck 0.106 Jam 496,550 52,783.27
Jumlah Harga Peralatan 52,783.27
Jumlah 52,783.27
Overhead & Profit 15 % 7,917.49

Nilai HSPK : 60,701.00


2.01.02.02.02.016 1 m3 Pekerjaan tanah dihampar, m3 Nilai HSPK 25,735.00
diratakan dan dirapihkan (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.014 O.H 130,000 1,870.70
1.10.28.02.01.002.001 Pekerja 0.144 O.H 90,000 12,951.00
Jumlah Harga Tenaga Kerja 14,821.70

176
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.09.02.01.001.00001 Bulldozer 0.01799 Jam 420,000 7,555.80
Jumlah Harga Peralatan 7,555.80
Jumlah 22,377.50
Overhead & Profit 15 % 3,356.63

Nilai HSPK : 25,735.00


2.01.02.02.02.017 1 m3 Pekerjaan angkutan material/ m3 Nilai HSPK 98,789.00
sisa galian sejauh 3 km (dengan (dibulatkan) :
dump truck)
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.08.01.01.001.00001 Dump Truck 0.173 Jam 496,550 85,903.15
Jumlah Harga Peralatan 85,903.15
Jumlah 85,903.15
Overhead & Profit 15 % 12,885.47

Nilai HSPK : 98,789.00


2.01.02.02.02.018 1 m3 Pekerjaan angkutan material/ m3 Nilai HSPK 120,717.00
sisa galian sejauh 5 km (dengan (dibulatkan) :
dump truck)
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.08.01.01.001.00001 Dump Truck 0.2114 Jam 496,550 104,970.67
Jumlah Harga Peralatan 104,970.67
Jumlah 104,970.67
Overhead & Profit 15 % 15,745.60

Nilai HSPK : 120,717.00


2.01.02.02.02.019 1 m3 Pekerjaan angkutan material/ m3 Nilai HSPK 209,912.00
sisa galian sejauh 10 km (dengan (dibulatkan) :
dump truck)
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.08.01.01.001.00001 Dump Truck 0.3676 Jam 496,550 182,531.78
Jumlah Harga Peralatan 182,531.78
Jumlah 182,531.78
Overhead & Profit 15 % 27,379.77

Nilai HSPK : 209,912.00


2.01.02.02.02.020 1 m3 Pekerjaan angkutan material/ m3 Nilai HSPK 388,383.00
sisa galian sejauh 20 km (dengan (dibulatkan) :
dump truck)
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.08.01.01.001.00001 Dump Truck 0.68014 Jam 496,550 337,723.52
Jumlah Harga Peralatan 337,723.52
Jumlah 337,723.52
Overhead & Profit 15 % 50,658.53

177
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Nilai HSPK : 388,383.00
2.01.02.02.02.021 1 m3 Pekerjaan angkutan material/ m3 Nilai HSPK 566,830.00
sisa galian sejauh 30 km (dengan (dibulatkan) :
dump truck)
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.08.01.01.001.00001 Dump Truck 0.9926 Jam 496,550 492,895.39
Jumlah Harga Peralatan 492,895.39
Jumlah 492,895.39
Overhead & Profit 15 % 73,934.31

Nilai HSPK : 566,830.00


2.01.02.02.03 Pekerjaan Pasangan
2.01.02.02.03.001 1 m3 Pekerjaan Pasangan Batu Bata m3 Nilai HSPK 1,266,991.00
Merah, Kelas 1, Campuran (1 Pc : 3 (dibulatkan) :
PP)
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.240 O.H 130,000 31,200.00
1.10.28.02.01.001.002 Kepala Tukang 0.240 O.H 120,000 28,800.00
1.10.28.02.01.001.006 Tukang Batu 1.200 O.H 110,000 132,000.00
1.10.28.02.01.002.001 Pekerja 2.400 O.H 90,000 216,000.00
Jumlah Harga Tenaga Kerja 408,000.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 132.000 Kg 1,306 172,412.66
1.1.7.01.01.01.004.00002 Pasir Pasang 0.370 m3 232,250 85,932.50
1.1.7.01.01.01.005.00010 Batu Bata Merah, Kelas 1 500.000 Buah 871 435,385.50
Jumlah Harga Bahan 693,730.66
Peralatan
Jumlah Harga Peralatan
Jumlah 1,101,730.66
Overhead & Profit 15 % 165,259.60

Nilai HSPK : 1,266,991.00


2.01.02.02.03.002 1 m3 Pekerjaan Pasangan Batu Bata m3 Nilai HSPK 1,230,023.00
Merah, Kelas 1, Campuran (1 Pc : 4 (dibulatkan) :
PP)
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.240 O.H 130,000 31,200.00
1.10.28.02.01.001.002 Kepala Tukang 0.240 O.H 120,000 28,800.00
1.10.28.02.01.001.006 Tukang Batu 1.200 O.H 110,000 132,000.00
1.10.28.02.01.002.001 Pekerja 2.400 O.H 90,000 216,000.00
Jumlah Harga Tenaga Kerja 408,000.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 106.500 Kg 1,306 139,105.67
1.1.7.01.01.01.004.00002 Pasir Pasang 0.375 m3 232,250 87,093.75
1.1.7.01.01.01.005.00010 Batu Bata Merah, Kelas 1 500.000 Buah 871 435,385.50
Jumlah Harga Bahan 661,584.92
Peralatan
Jumlah Harga Peralatan
Jumlah 1,069,584.92
Overhead & Profit 15 % 160,437.74

Nilai HSPK : 1,230,023.00


2.01.02.02.03.003 1 m3 Pekerjaan Pasangan Batu Bata m3 Nilai HSPK 1,213,085.00
Merah, Kelas 1, Campuran (1 Pc : 5 (dibulatkan) :
PP)
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.240 O.H 130,000 31,200.00
1.10.28.02.01.001.002 Kepala Tukang 0.240 O.H 120,000 28,800.00
1.10.28.02.01.001.006 Tukang Batu 1.200 O.H 110,000 132,000.00
1.10.28.02.01.002.001 Pekerja 2.400 O.H 90,000 216,000.00

178
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Jumlah Harga Tenaga Kerja 408,000.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 89.000 Kg 1,306 116,247.93
1.1.7.01.01.01.004.00002 Pasir Pasang 0.410 m3 232,250 95,222.50
1.1.7.01.01.01.005.00010 Batu Bata Merah, Kelas 1 500.000 Buah 871 435,385.50
Jumlah Harga Bahan 646,855.93
Peralatan
Jumlah Harga Peralatan
Jumlah 1,054,855.93
Overhead & Profit 15 % 158,228.39

Nilai HSPK : 1,213,085.00


2.01.02.02.03.004 1 m3 Pekerjaan Pasangan Batu Bata m3 Nilai HSPK 1,213,423.00
Merah, Kelas 1, Campuran (1 Pc : 6 (dibulatkan) :
PP)
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.240 O.H 130,000 31,200.00
1.10.28.02.01.001.002 Kepala Tukang 0.240 O.H 120,000 28,800.00
1.10.28.02.01.001.006 Tukang Batu 1.200 O.H 110,000 132,000.00
1.10.28.02.01.002.001 Pekerja 2.400 O.H 90,000 216,000.00
Jumlah Harga Tenaga Kerja 408,000.00
Bahan
1.1.7.01.01.01.002.00001 Semen Portland 75.000 Kg 1,306 97,961.74
1.1.7.01.01.01.004.00002 Pasir Pasang 0.490 m3 232,250 113,802.50
1.1.7.01.01.01.005.00010 Batu Bata Merah, Kelas 1 500.000 Buah 871 435,385.50
Jumlah Harga Bahan 647,149.74
Peralatan
Jumlah Harga Peralatan
Jumlah 1,055,149.74
Overhead & Profit 15 % 158,272.46

Nilai HSPK : 1,213,423.00


2.01.02.02.03.005 1 M3 Pembuatan Bronjong dengan m3 Nilai HSPK 974,660.00
kawat galvanis (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 2.033 OH 90,000 183,006.00
1.10.28.02.01.001.006 Tukang Batu 0.733 OH 110,000 80,674.00
1.10.28.02.01.001.001 Mandor 0.025 OH 130,000 3,250.00
Jumlah Harga Tenaga Kerja 266,930.00
Bahan
1.1.7.01.01.05.001.00025 Kawat Bronjong Uk. 2x1x0,5 m, 1.000 m3 284,500 284,500.00
Lubang 8x10 cm
1.1.7.01.01.01.005.00004 Batu Pecah Uk. 3-5 cm 1.000 M3 296,100 296,100.00
Jumlah Harga Bahan 580,600.00
Peralatan
Jumlah Harga Peralatan
Jumlah 847,530.00
Overhead & Profit 15 % 127,129.50

Nilai HSPK : 974,660.00


2.01.02.02.04 Pekerjaan Cerucuk Dan Turap

2.01.02.02.04.001 Pekerjaan pemancangan 1 m m' Nilai HSPK 43,399.00


panjang cerucuk gelam dia. 8–10 cm (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.003 O.H 130,000 390.00
1.10.28.02.01.002.001 Pekerja 0.030 O.H 90,000 2,700.00
1.10.28.02.01.001.015 Operator Alat Berat 0.005 O.H 110,000 550.00
Jumlah Harga Tenaga Kerja 3,640.00
Bahan
1.1.7.01.01.05.002.00054 Dolken Kayu, dia. 8-10/400 cm 0.263 Batang 21,500 5,643.75
Jumlah Harga Bahan 5,643.75
Peralatan

179
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
9.1.2.09.03.01.001.00074 Tripod tinggi 5 m 0.005 Unit/hari 29,900 149.50
9.1.2.09.03.01.001.00042 Pile Driver + Hammer 0.040 Jam 258,250 10,330.00
9.1.2.09.03.01.001.00055 Alat penyambung tiang pancang 0.250 Unit/hari 71,900 17,975.00
dolken
Jumlah Harga Peralatan 28,454.50
Jumlah 37,738.25
Overhead & Profit 15 % 5,660.74

Nilai HSPK : 43,399.00


2.01.02.02.04.002 Pekerjaan pemancangan 1 m m' Nilai HSPK 73,306.00
panjang cerucuk bambu dia. 8–10 (dibulatkan) :
cm
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.012 O.H 130,000 1,560.00
1.10.28.02.01.002.001 Pekerja 0.120 O.H 90,000 10,800.00
1.10.28.02.01.001.015 Operator Alat Berat 0.040 O.H 110,000 4,400.00
Jumlah Harga Tenaga Kerja 16,760.00
Bahan
1.1.7.01.01.05.007.00042 Bambu bongkotan 1.050 Btg 16,650 17,482.50
Jumlah Harga Bahan 17,482.50
Peralatan
9.1.2.09.03.01.001.00074 Tripod tinggi 5 m 0.040 Unit/hari 29,900 1,196.00
9.1.2.09.03.01.001.00042 Pile Driver + Hammer 0.040 Jam 258,250 10,330.00
9.1.2.09.03.01.001.00055 Alat penyambung tiang pancang 0.250 Unit/hari 71,900 17,975.00
dolken
Jumlah Harga Peralatan 29,501.00
Jumlah 63,743.50
Overhead & Profit 15 % 9,561.53

Nilai HSPK : 73,306.00


2.01.02.02.04.003 Pekerjaan pemancangan 1 m m' Nilai HSPK 215,960.00
pancang beton bertulang dia. 25/25 (dibulatkan) :
cm
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.025 O.H 130,000 3,250.00
1.10.28.02.01.001.006 Tukang Batu 0.031 O.H 110,000 3,432.00
1.10.28.02.01.002.001 Pekerja 0.250 O.H 90,000 22,500.00
Jumlah Harga Tenaga Kerja 29,182.00
Bahan
1.1.7.01.01.01.011.00001 Tiang Pancang Beton Tulang Uk. 25 x 1.030 m' 73,050 75,241.50
25 cm
Jumlah Harga Bahan 75,241.50
Peralatan
9.1.2.09.03.01.001.00074 Tripod tinggi 5 m 0.031 Unit/hari 29,900 932.88
9.1.2.09.03.01.001.00042 Pile Driver + Hammer 0.250 Jam 258,250 64,459.20
9.1.2.09.03.01.001.00055 Alat penyambung tiang pancang 0.250 Unit/hari 71,900 17,975.00
dolken
Jumlah Harga Peralatan 83,367.08
Jumlah 187,790.58
Overhead & Profit 15 % 28,168.59

Nilai HSPK : 215,960.00


2.01.02.02.04.004 Pekerjaan pemancangan 1 m m' Nilai HSPK 306,278.00
pancang beton bertulang dia. 30/30 (dibulatkan) :
cm
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.025 O.H 130,000 3,250.00
1.10.28.02.01.001.006 Tukang Batu 0.031 O.H 110,000 3,432.00
1.10.28.02.01.002.001 Pekerja 0.250 O.H 90,000 22,500.00
Jumlah Harga Tenaga Kerja 29,182.00
Bahan
1.1.7.01.01.01.011.00003 Tiang Pancang beton tulang 30x30 1.030 m' 149,300 153,779.00
cm
Jumlah Harga Bahan 153,779.00

180
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Peralatan
9.1.2.09.03.01.001.00074 Tripod tinggi 5 m 0.031 Unit/hari 29,900 932.88
9.1.2.09.03.01.001.00042 Pile Driver + Hammer 0.250 Jam 258,250 64,459.20
9.1.2.09.03.01.001.00055 Alat penyambung tiang pancang 0.250 Unit/hari 71,900 17,975.00
dolken
Jumlah Harga Peralatan 83,367.08
Jumlah 266,328.08
Overhead & Profit 15 % 39,949.21

Nilai HSPK : 306,278.00


2.01.02.02.04.005 Pekerjaan pemancangan 1 m m' Nilai HSPK 285,775.00
pancang beton bertulang dia. 40/40 (dibulatkan) :
cm
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.025 O.H 130,000 3,250.00
1.10.28.02.01.001.006 Tukang Batu 0.031 O.H 110,000 3,432.00
1.10.28.02.01.002.001 Pekerja 0.250 O.H 90,000 22,500.00
Jumlah Harga Tenaga Kerja 29,182.00
Bahan
1.1.7.01.01.01.011.00002 Tiang Pancang Beton Tulang Uk. 40 x 1.030 m' 186,750 192,352.50
40 cm
Jumlah Harga Bahan 192,352.50
Peralatan
9.1.2.09.03.01.001.00074 Tripod tinggi 5 m 0.031 Unit/hari 29,900 932.88
9.1.2.09.03.01.001.00042 Pile Driver + Hammer 0.031 Unit/hari 258,250 8,057.40
9.1.2.09.03.01.001.00055 Alat penyambung tiang pancang 0.250 Unit/hari 71,900 17,975.00
dolken
Jumlah Harga Peralatan 26,965.28
Jumlah 248,499.78
Overhead & Profit 15 % 37,274.97

Nilai HSPK : 285,775.00


2.01.02.02.04.006 1 m' Pekerjaan Pemasangan Turap m' Nilai HSPK 65,764.00
Bambu tinggi 1,5 m (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.007 O.H 130,000 910.00
1.10.28.02.01.001.002 Kepala Tukang 0.002 O.H 120,000 240.00
1.10.28.02.01.001.004 Tukang Kayu 0.022 O.H 110,000 2,420.00
1.10.28.02.01.002.001 Pekerja 0.273 O.H 90,000 24,570.00
Jumlah Harga Tenaga Kerja 28,140.00
Bahan
1.1.7.01.01.05.007.00042 Bambu Bongkotan 0.545 Batang 16,650 9,074.25
1.1.7.01.01.05.007.00045 Gedek Guling Uk. 100 x 300 cm 0.273 Lembar 66,800 18,203.00
1.1.7.01.01.05.001.00017 Kawat Ikat (Bendrat) Besi Uk. 0,1 cm 0.004 Roll 402,000 1,768.80
x 25 Kg
Jumlah Harga Bahan 29,046.05
Peralatan
Jumlah Harga Peralatan
Jumlah 57,186.05
Overhead & Profit 15 % 8,577.91

Nilai HSPK : 65,764.00


2.01.02.02.04.007 1 m' Pekerjaan Pemasangan Turap m' Nilai HSPK 135,569.00
Bambu tinggi 2,75 m (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.013 O.H 130,000 1,690.00
1.10.28.02.01.001.002 Kepala Tukang 0.004 O.H 120,000 480.00
1.10.28.02.01.001.004 Tukang Kayu 0.040 O.H 110,000 4,400.00
1.10.28.02.01.002.001 Pekerja 0.500 O.H 90,000 45,000.00
Jumlah Harga Tenaga Kerja 51,570.00
Bahan
1.1.7.01.01.05.007.00042 Bambu Bongkotan 1.000 btg 16,650 16,650.00
1.1.7.01.01.05.007.00046 Gedek Guling Uk. 200 x 300 cm 0.500 Lembar 92,900 46,450.00

181
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
1.1.7.01.01.05.001.00017 Kawat Ikat (Bendrat) Besi Uk. 0,1 cm 0.008 Roll 402,000 3,216.00
x 25 Kg
Jumlah Harga Bahan 66,316.00
Peralatan
Jumlah Harga Peralatan
Jumlah 117,886.00
Overhead & Profit 15 % 17,682.90

Nilai HSPK : 135,569.00


2.01.02.02.04.008 Pengeringan/pemompaan Air per 1 Jam Nilai HSPK 19,225.00
jam (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.002.001 Operator pompa 0.042 O.H 90,000 3,780.00
1.10.28.02.01.001.018 Mekanik 0.042 O.H 100,000 4,200.00
Jumlah Harga Tenaga Kerja 7,980.00
Bahan
1.1.7.01.01.04.001.00006 Solar Industri 0.500 Liter 14,450 7,225.00
Jumlah Harga Bahan 7,225.00
Peralatan
9.1.2.09.03.01.001.00047 Water Pump 70-100 Mm 0.042 jam 36,000 1,512.00
Jumlah Harga Peralatan 1,512.00
Jumlah 16,717.00
Overhead & Profit 15 % 2,507.55

Nilai HSPK : 19,225.00


2.01.02.02.04.009 1 m2 Pekerjaan Pemasangan Turap m2 Nilai HSPK 305,457.00
Papan tebal 3 cm (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.025 O.H 130,000 3,250.00
1.10.28.02.01.001.002 Kepala Tukang 0.008 O.H 120,000 960.00
1.10.28.02.01.001.004 Tukang Kayu 0.080 O.H 110,000 8,800.00
1.10.28.02.01.002.001 Pekerja 1.000 O.H 90,000 90,000.00
Jumlah Harga Tenaga Kerja 103,010.00
Bahan
1.1.7.01.01.05.002.00038 Kayu Kamper, Papan, Uk. 2 x 20 x 0.030 m3 5,224,650 156,739.50
400 cm
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.300 Kg 19,550 5,865.00
Jumlah Harga Bahan 162,604.50
Peralatan
Jumlah Harga Peralatan
Jumlah 265,614.50
Overhead & Profit 15 % 39,842.18

Nilai HSPK : 305,457.00


2.01.02.02.04.010 1 m3 Pekerjaan Timbunan Pasir m3 Nilai HSPK 288,918.00
dalam Karung (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.010 O.H 130,000 1,300.00
1.10.28.02.01.002.001 Pekerja 0.288 O.H 90,000 25,920.00
Jumlah Harga Tenaga Kerja 27,220.00
Bahan
1.1.7.01.01.01.004.00003 Pasir Urug 1.000 m3 162,550 162,550.00
1.1.7.01.01.01.020.00001 Glangsing 20.000 Buah 3,050 61,000.00
1.1.7.01.01.05.007.00043 Keranjang 0.050 Buah 9,250 462.50
Jumlah Harga Bahan 224,012.50
Peralatan
Jumlah Harga Peralatan
Jumlah 251,232.50
Overhead & Profit 15 % 37,684.88

Nilai HSPK : 288,918.00


2.01.02.02.05 Pekerjaan Drainase

182
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
2.01.02.02.05.001 1 m' Pekerjaan Pemasangan, m' Nilai HSPK 830,236.00
Penyambungan dan Pengetesan (dibulatkan) :
Kebocoran Pipa PVC Dia 12inch.

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.010 O.H 130,000 1,300.00
1.10.28.02.01.001.009 Tukang Pipa 0.040 O.H 110,000 4,400.00
1.10.28.02.01.002.001 Pekerja 0.240 O.H 90,000 21,600.00
Jumlah Harga Tenaga Kerja 27,300.00
Bahan
1.1.7.02.02.06.001.00030 Pipa PVC Maspion, AW 12inch. 0.175 Batang 3,678,150 643,676.25
1.1.7.01.01.01.022.00277 Klem PVC Kecil 0.667 Buah 72,350 48,235.75
1.1.7.01.01.01.022.00224 Amplas Kasar 0.400 Lembar 5,850 2,340.00
Jumlah Harga Bahan 694,252.00
Peralatan
9.1.2.09.03.01.001.00062 Gergaji Besi 0.010 Unit/Hari 39,150 391.50
Jumlah Harga Peralatan 391.50
Jumlah 721,943.50
Overhead & Profit 15 % 108,291.52

Nilai HSPK : 830,236.00


2.01.02.02.05.002 1m' Pekerjaan Pemasangan, m' Nilai HSPK 458,974.00
Penyambungan dan Pengetesan (dibulatkan) :
Kebocoran Pipa PVC Dia 8 inch.

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.010 O.H 130,000 1,300.00
1.10.28.02.01.001.009 Tukang Pipa 0.240 O.H 110,000 26,400.00
1.10.28.02.01.002.001 Pekerja 0.040 O.H 90,000 3,600.00
Jumlah Harga Tenaga Kerja 31,300.00
Bahan
1.1.7.02.02.06.001.00028 Pipa PVC Maspion, AW 8inch. x 4 m 0.175 Batang 1,811,800 317,065.00

1.1.7.01.01.01.022.00277 Lem Isarplas, 300 Gr 0.667 Buah 72,350 48,235.75


1.1.7.01.01.01.022.00225 Amplas Halus 0.400 Lembar 5,250 2,100.00
Jumlah Harga Bahan 367,400.75
Peralatan
1.3.2.03.02.07.001.00002 Gergaji Sherlock, 14inch./350mm 0.010 Buah 40,650 406.50

Jumlah Harga Peralatan 406.50


Jumlah 399,107.25
Overhead & Profit 15 % 59,866.09

Nilai HSPK : 458,974.00


2.01.02.02.05.003 1m' Pekerjaan Pemasangan, m' Nilai HSPK 328,752.00
Penyambungan dan Pengetesan (dibulatkan) :
Kebocoran Pipa PVC Dia 6 inch.

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.010 O.H 130,000 1,300.00
1.10.28.02.01.001.009 Tukang Pipa 0.240 O.H 110,000 26,400.00
1.10.28.02.01.002.001 Pekerja 0.040 O.H 90,000 3,600.00
Jumlah Harga Tenaga Kerja 31,300.00
Bahan
1.1.7.02.02.06.001.00027 Pipa PVC Maspion, AW 6inch. x 4 m 0.175 Batang 1,164,900 203,857.50

1.1.7.01.01.01.022.00277 Klem PVC Kecil 0.667 Buah 72,350 48,235.75


1.1.7.01.01.01.022.00225 Amplas Halus 0.400 Lembar 5,250 2,100.00
Jumlah Harga Bahan 254,193.25
Peralatan
1.3.2.03.02.07.001.00001 Gergaji besi 0.010 Buah 37,750 377.50
Jumlah Harga Peralatan 377.50
Jumlah 285,870.75
Overhead & Profit 15 % 42,880.61

183
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f

Nilai HSPK : 328,752.00


2.01.02.02.05.004 1m' Pekerjaan Pemasangan, m' Nilai HSPK 527,523.00
Penyambungan dan Pengetesan (dibulatkan) :
Kebocoran Pipa Galvanis Dia 6inch.
untuk saluran

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.010 O.H 130,000 1,300.00
1.10.28.02.01.001.009 Tukang Pipa 0.240 O.H 110,000 26,400.00
1.10.28.02.01.002.001 Pekerja 0.040 O.H 90,000 3,600.00
Jumlah Harga Tenaga Kerja 31,300.00
Bahan
1.1.7.02.02.07.001.00011 Pipa Galvanis Dia, 6inch. @6m 0.175 Batang 2,440,050 427,008.75
Medium A
Jumlah Harga Bahan 427,008.75
Peralatan
1.3.2.03.02.07.001.00002 Gergaji Sherlock, 14inch./350mm 0.010 Buah 40,650 406.50

Jumlah Harga Peralatan 406.50


Jumlah 458,715.25
Overhead & Profit 15 % 68,807.29

Nilai HSPK : 527,523.00


2.01.02.02.05.005 1 Unit Pemasangan U Ditch ukuran Unit Nilai HSPK 713,632.00
400.400.1200, 60 mm dengan beban (dibulatkan) :
gandar 5 Ton

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.000 O.H 130,000 52.00
1.10.28.02.01.001.015 Operator Alat Berat 0.015 O.H 110,000 1,650.00
1.10.28.02.01.002.001 Pekerja 0.003 O.H 90,000 297.00
Jumlah Harga Tenaga Kerja 1,999.00
Bahan
1.1.7.01.01.01.022.00400 U-Ditch Lisa Concrete, 1.000 Buah 573,550 573,550.00
400x400x1200 mm
Jumlah Harga Bahan 573,550.00
Peralatan
9.1.2.09.03.01.001.00024 Crane 10-15 Ton 0.015 Jam 3,000,000 45,000.00
Jumlah Harga Peralatan 45,000.00
Jumlah 620,549.00
Overhead & Profit 15 % 93,082.35

Nilai HSPK : 713,632.00


2.01.02.02.05.006 1 Unit Pemasangan U Ditch ukuran Unit Nilai HSPK 803,815.00
400.500.1200, 60 mm dengan beban (dibulatkan) :
gandar 5 Ton

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.000 O.H 130,000 52.00
1.10.28.02.01.001.015 Operator Alat Berat 0.016 O.H 110,000 1,793.00
1.10.28.02.01.002.001 Pekerja 0.004 O.H 90,000 324.00
Jumlah Harga Tenaga Kerja 2,169.00
Bahan
1.1.7.01.01.01.022.00401 U-Ditch Lisa Concrete, 1.000 Buah 647,900 647,900.00
400x500x1200 mm
Jumlah Harga Bahan 647,900.00
Peralatan
9.1.2.09.03.01.001.00024 Crane 10-15 Ton 0.016 Jam 3,000,000 48,900.00
Jumlah Harga Peralatan 48,900.00
Jumlah 698,969.00
Overhead & Profit 15 % 104,845.35

Nilai HSPK : 803,815.00

184
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
2.01.02.02.05.007 1 Unit Pemasangan U Ditch ukuran Unit Nilai HSPK 890,880.00
400.600.1200, 60 mm dengan beban (dibulatkan) :
gandar 5 Ton

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.000 O.H 130,000 52.00
1.10.28.02.01.001.015 Operator Alat Berat 0.018 O.H 110,000 1,925.00
1.10.28.02.01.002.001 Pekerja 0.004 O.H 90,000 351.00
Jumlah Harga Tenaga Kerja 2,328.00
Bahan
1.1.7.01.01.01.022.00402 U-Ditch Lisa Concrete, 1.000 Buah 719,850 719,850.00
400x600x1200 mm
Jumlah Harga Bahan 719,850.00
Peralatan
9.1.2.09.03.01.001.00024 Crane 10-15 Ton 0.018 Jam 3,000,000 52,500.00
Jumlah Harga Peralatan 52,500.00
Jumlah 774,678.00
Overhead & Profit 15 % 116,201.70

Nilai HSPK : 890,880.00


2.01.02.02.05.008 1 Unit Pemasangan U Ditch ukuran Unit Nilai HSPK 1,047,778.00
500.500.1200, 60 mm dengan beban (dibulatkan) :
gandar 5 Ton

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.001 O.H 130,000 65.00
1.10.28.02.01.001.015 Operator Alat Berat 0.019 O.H 110,000 2,068.00
1.10.28.02.01.002.001 Pekerja 0.004 O.H 90,000 378.00
Jumlah Harga Tenaga Kerja 2,511.00
Bahan
1.1.7.01.01.01.022.00403 U-Ditch Lisa Concrete, 1.000 Buah 852,200 852,200.00
500x500x1200 mm
Jumlah Harga Bahan 852,200.00
Peralatan
9.1.2.09.03.01.001.00024 Crane 10-15 Ton 0.019 Jam 3,000,000 56,400.00
Jumlah Harga Peralatan 56,400.00
Jumlah 911,111.00
Overhead & Profit 15 % 136,666.65

Nilai HSPK : 1,047,778.00


2.01.02.02.05.009 1 Unit Pemasangan U Ditch ukuran Unit Nilai HSPK 1,169,621.00
500.600.1200, 60 mm dengan beban (dibulatkan) :
gandar 5 Ton

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.001 O.H 130,000 65.00
1.10.28.02.01.001.015 Operator Alat Berat 0.020 O.H 110,000 2,200.00
1.10.28.02.01.002.001 Pekerja 0.004 O.H 90,000 396.00
Jumlah Harga Tenaga Kerja 2,661.00
Bahan
1.1.7.01.01.01.022.00404 U-Ditch Lisa Concrete, 1.000 Buah 954,400 954,400.00
500x600x1200 mm
Jumlah Harga Bahan 954,400.00
Peralatan
9.1.2.09.03.01.001.00024 Crane 10-15 Ton 0.020 Jam 3,000,000 60,000.00
Jumlah Harga Peralatan 60,000.00
Jumlah 1,017,061.00
Overhead & Profit 15 % 152,559.15

Nilai HSPK : 1,169,621.00


2.01.02.02.05.010 1 Unit Pemasangan U Ditch ukuran Unit Nilai HSPK 1,289,129.00
500.700.1200, 60 mm dengan beban (dibulatkan) :
gandar 5 Ton

185
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.001 O.H 130,000 65.00
1.10.28.02.01.001.015 Operator Alat Berat 0.021 O.H 110,000 2,343.00
1.10.28.02.01.002.001 Pekerja 0.005 O.H 90,000 423.00
Jumlah Harga Tenaga Kerja 2,831.00
Bahan
1.1.7.01.01.01.022.00405 U-Ditch Lisa Concrete, 1.000 Buah 1,054,250 1,054,250.00
500x700x1200 mm
Jumlah Harga Bahan 1,054,250.00
Peralatan
9.1.2.09.03.01.001.00024 Crane 10-15 Ton 0.021 Jam 3,000,000 63,900.00
Jumlah Harga Peralatan 63,900.00
Jumlah 1,120,981.00
Overhead & Profit 15 % 168,147.15

Nilai HSPK : 1,289,129.00


2.01.02.02.05.011 1 Unit Pemasangan U Ditch ukuran Unit Nilai HSPK 1,272,401.00
600.600.1200, 60 mm dengan beban (dibulatkan) :
gandar 5 Ton

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.001 O.H 130,000 91.00
1.10.28.02.01.001.015 Operator Alat Berat 0.030 O.H 110,000 3,300.00
1.10.28.02.01.002.001 Pekerja 0.007 O.H 90,000 594.00
Jumlah Harga Tenaga Kerja 3,985.00
Bahan
1.1.7.01.01.01.022.00406 U-Ditch Lisa Concrete, 1.000 Buah 1,012,450 1,012,450.00
600x600x1200 mm
Jumlah Harga Bahan 1,012,450.00
Peralatan
9.1.2.09.03.01.001.00024 Crane 10-15 Ton 0.030 Jam 3,000,000 90,000.00
Jumlah Harga Peralatan 90,000.00
Jumlah 1,106,435.00
Overhead & Profit 15 % 165,965.25

Nilai HSPK : 1,272,401.00


2.01.02.02.05.012 1 Unit Pemasangan U Ditch ukuran Unit Nilai HSPK 1,393,350.00
600.700.1200, 60 mm dengan beban (dibulatkan) :
gandar 5 Ton

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.001 O.H 130,000 91.00
1.10.28.02.01.001.015 Operator Alat Berat 0.032 O.H 110,000 3,487.00
1.10.28.02.01.002.001 Pekerja 0.007 O.H 90,000 630.00
Jumlah Harga Tenaga Kerja 4,208.00
Bahan
1.1.7.01.01.01.022.00407 U-Ditch Lisa Concrete, 1.000 Buah 1,112,300 1,112,300.00
600x700x1200 mm
Jumlah Harga Bahan 1,112,300.00
Peralatan
9.1.2.09.03.01.001.00024 Crane 10-15 Ton 0.032 Jam 3,000,000 95,100.00
Jumlah Harga Peralatan 95,100.00
Jumlah 1,211,608.00
Overhead & Profit 15 % 181,741.20

Nilai HSPK : 1,393,350.00


2.01.02.02.05.013 1 Unit Pemasangan U Ditch ukuran Unit Nilai HSPK 1,514,314.00
600.800.1200, 60 mm dengan beban (dibulatkan) :
gandar 5 Ton

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.001 O.H 130,000 104.00
1.10.28.02.01.001.015 Operator Alat Berat 0.033 O.H 110,000 3,674.00
1.10.28.02.01.002.001 Pekerja 0.007 O.H 90,000 666.00

186
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Jumlah Harga Tenaga Kerja 4,444.00
Bahan
1.1.7.01.01.01.022.00408 U-Ditch Lisa Concrete, 1.000 Buah 1,212,150 1,212,150.00
600x800x1200 mm
Jumlah Harga Bahan 1,212,150.00
Peralatan
9.1.2.09.03.01.001.00024 Crane 10-15 Ton 0.033 Jam 3,000,000 100,200.00
Jumlah Harga Peralatan 100,200.00
Jumlah 1,316,794.00
Overhead & Profit 15 % 197,519.10

Nilai HSPK : 1,514,314.00


2.01.02.02.05.014 1 Unit Pemasangan U Ditch ukuran Unit Nilai HSPK 1,916,557.00
800.800.1200, 80 mm dengan beban (dibulatkan) :
gandar 5 Ton

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.001 O.H 130,000 130.00
1.10.28.02.01.001.015 Operator Alat Berat 0.045 O.H 110,000 4,950.00
1.10.28.02.01.002.001 Pekerja 0.010 O.H 90,000 891.00
Jumlah Harga Tenaga Kerja 5,971.00
Bahan
1.1.7.01.01.01.022.00409 U-Ditch Lisa Concrete, 1.000 Buah 1,525,600 1,525,600.00
800x800x1200 mm
Jumlah Harga Bahan 1,525,600.00
Peralatan
9.1.2.09.03.01.001.00024 Crane 10-15 Ton 0.045 Jam 3,000,000 135,000.00
Jumlah Harga Peralatan 135,000.00
Jumlah 1,666,571.00
Overhead & Profit 15 % 249,985.65

Nilai HSPK : 1,916,557.00


2.01.02.02.05.015 1 Unit Pemasangan U Ditch ukuran Unit Nilai HSPK 2,197,856.00
800.900.1200, 100 mm dengan (dibulatkan) :
beban gandar 5 Ton

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.001 O.H 130,000 143.00
1.10.28.02.01.001.015 Operator Alat Berat 0.047 O.H 110,000 5,159.00
1.10.28.02.01.002.001 Pekerja 0.010 O.H 90,000 927.00
Jumlah Harga Tenaga Kerja 6,229.00
Bahan
1.1.7.01.01.01.022.00432 U-Ditch Gandar 5 T U 80.90.120.10 1.000 Buah 1,764,250 1,764,250.00
cm
Jumlah Harga Bahan 1,764,250.00
Peralatan
9.1.2.09.03.01.001.00024 Crane 10-15 Ton 0.047 Jam 3,000,000 140,700.00
Jumlah Harga Peralatan 140,700.00
Jumlah 1,911,179.00
Overhead & Profit 15 % 286,676.85

Nilai HSPK : 2,197,856.00


2.01.02.02.05.016 1 Unit Pemasangan U Ditch ukuran Unit Nilai HSPK 2,175,943.00
800.1000.1200, 100 mm dengan (dibulatkan) :
beban gandar 5 Ton

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.001 O.H 130,000 143.00
1.10.28.02.01.001.015 Operator Alat Berat 0.049 O.H 110,000 5,368.00
1.10.28.02.01.002.001 Pekerja 0.011 O.H 90,000 963.00
Jumlah Harga Tenaga Kerja 6,474.00
Bahan
1.1.7.01.01.01.022.00410 U-Ditch Lisa Concrete, 1.000 Buah 1,739,250 1,739,250.00
800x1000x1200 mm

187
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Jumlah Harga Bahan 1,739,250.00
Peralatan
9.1.2.09.03.01.001.00024 Crane 10-15 Ton 0.049 Jam 3,000,000 146,400.00
Jumlah Harga Peralatan 146,400.00
Jumlah 1,892,124.00
Overhead & Profit 15 % 283,818.60

Nilai HSPK : 2,175,943.00


2.01.02.02.05.017 1 Unit Pemasangan U Ditch ukuran Unit Nilai HSPK 3,226,669.00
1000.1000.1200, 100 mm dengan (dibulatkan) :
beban gandar 5 Ton

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.001 O.H 130,000 182.00
1.10.28.02.01.001.015 Operator Alat Berat 0.063 O.H 110,000 6,875.00
1.10.28.02.01.002.001 Pekerja 0.014 O.H 90,000 1,242.00
Jumlah Harga Tenaga Kerja 8,299.00
Bahan
1.1.7.01.01.01.022.00412 U-Ditch Lisa Concrete, 1.000 Buah 2,610,000 2,610,000.00
1000x1000x1200 mm
Jumlah Harga Bahan 2,610,000.00
Peralatan
9.1.2.09.03.01.001.00024 Crane 10-15 Ton 0.063 Jam 3,000,000 187,500.00
Jumlah Harga Peralatan 187,500.00
Jumlah 2,805,799.00
Overhead & Profit 15 % 420,869.85

Nilai HSPK : 3,226,669.00


2.01.02.02.05.018 1 Unit Pemasangan U Ditch ukuran Unit Nilai HSPK 3,602,324.00
1000.1200.1200, 100 mm dengan (dibulatkan) :
beban gandar 5 Ton

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.002 O.H 130,000 195.00
1.10.28.02.01.001.015 Operator Alat Berat 0.067 O.H 110,000 7,337.00
1.10.28.02.01.002.001 Pekerja 0.015 O.H 90,000 1,323.00
Jumlah Harga Tenaga Kerja 8,855.00
Bahan
1.1.7.01.01.01.022.00413 U-Ditch Lisa Concrete, 1.000 Buah 2,923,500 2,923,500.00
1000x1200x1200 mm
Jumlah Harga Bahan 2,923,500.00
Peralatan
9.1.2.09.03.01.001.00024 Crane 10-15 Ton 0.067 Jam 3,000,000 200,100.00
Jumlah Harga Peralatan 200,100.00
Jumlah 3,132,455.00
Overhead & Profit 15 % 469,868.25

Nilai HSPK : 3,602,324.00


2.01.02.02.05.019 1 Unit Pemasangan U Ditch ukuran Unit Nilai HSPK 3,330,262.00
1200.1000.1200, 100 mm dengan (dibulatkan) :
beban gandar 5 Ton

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.002 O.H 130,000 247.00
1.10.28.02.01.001.015 Operator Alat Berat 0.085 O.H 110,000 9,350.00
1.10.28.02.01.002.001 Pekerja 0.019 O.H 90,000 1,683.00
Jumlah Harga Tenaga Kerja 11,280.00
Bahan
1.1.7.01.01.01.022.00433 U-Ditch Gandar 5 T U 1.000 Buah 2,629,600 2,629,600.00
120.100.120.10 cm
Jumlah Harga Bahan 2,629,600.00
Peralatan
9.1.2.09.03.01.001.00024 Crane 10-15 Ton 0.085 Jam 3,000,000 255,000.00
Jumlah Harga Peralatan 255,000.00

188
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Jumlah 2,895,880.00
Overhead & Profit 15 % 434,382.00

Nilai HSPK : 3,330,262.00


2.01.02.02.05.020 1 Unit Pemasangan U Ditch ukuran Unit Nilai HSPK 4,674,281.00
1200.1200.1200, 120 mm dengan (dibulatkan) :
beban gandar 5 Ton

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.002 O.H 130,000 260.00
1.10.28.02.01.001.015 Operator Alat Berat 0.090 O.H 110,000 9,900.00
1.10.28.02.01.002.001 Pekerja 0.020 O.H 90,000 1,782.00
Jumlah Harga Tenaga Kerja 11,942.00
Bahan
1.1.7.01.01.01.022.00414 U-Ditch Lisa Concrete, 1.000 Buah 3,782,650 3,782,650.00
1200x1200x1200 mm
Jumlah Harga Bahan 3,782,650.00
Peralatan
9.1.2.09.03.01.001.00024 Crane 10-15 Ton 0.090 Jam 3,000,000 270,000.00
Jumlah Harga Peralatan 270,000.00
Jumlah 4,064,592.00
Overhead & Profit 15 % 609,688.80

Nilai HSPK : 4,674,281.00


2.01.02.02.05.021 1 m' Pekerjaan Gorong - Gorong m' Nilai HSPK 681,912.00
Buis Beton dia = 0.3 m (K-175) Tebal (dibulatkan) :
= 5 cm
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.029 O.H 130,000 3,770.00
1.10.28.02.01.001.002 Kepala Tukang 0.012 O.H 120,000 1,440.00
1.10.28.02.01.001.006 Tukang Batu 0.116 O.H 110,000 12,760.00
1.10.28.02.01.002.001 Pekerja 0.581 O.H 90,000 52,290.00
Jumlah Harga Tenaga Kerja 70,260.00
Bahan
2.01.01.03.01.005 Beton K - 175 0.055 m3 1,295,114.00 71,231.27
2.01.01.03.02.020 Bekisting 2.198 m2 203,534.00 447,367.73
Jumlah Harga Bahan 518,599.00
Peralatan
1.3.2.04.01.01.003.00007 Linggis 1inch. x 40cm 0.050 Buah 69,700 3,485.00
9.1.2.09.03.01.001.00067 Kayu Pemikul dan Tampar 0.050 Unit 12,450 622.50
Jumlah Harga Peralatan 4,107.50
Jumlah 592,966.50
Overhead & Profit 15 % 88,944.98

Nilai HSPK : 681,912.00


2.01.02.02.05.022 1 m' Pekerjaan Gorong - Gorong m' Nilai HSPK 875,673.00
Buis Beton dia = 0.4 m (K-175) Tebal (dibulatkan) :
= 5 cm
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.037 O.H 130,000 4,810.00
1.10.28.02.01.001.002 Kepala Tukang 0.015 O.H 120,000 1,800.00
1.10.28.02.01.001.006 Tukang Batu 0.149 O.H 110,000 16,390.00
1.10.28.02.01.002.001 Pekerja 0.744 O.H 90,000 66,960.00
Jumlah Harga Tenaga Kerja 89,960.00
Bahan
2.01.01.03.01.005 Beton K - 175 0.071 m3 1,295,114.00 91,953.09
2.01.01.03.02.020 Bekisting 2.826 m2 203,534.00 575,187.08
Jumlah Harga Bahan 667,140.18
Peralatan
1.3.2.04.01.01.003.00007 Linggis 1inch. x 40cm 0.053 Buah 69,700 3,694.10
9.1.2.09.03.01.001.00067 Kayu Pemikul dan Tampar 0.053 Unit 12,450 659.85
Jumlah Harga Peralatan 4,353.95
Jumlah 761,454.13
Overhead & Profit 15 % 114,218.12

189
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f

Nilai HSPK : 875,673.00


2.01.02.02.05.023 1 m' Pekerjaan Gorong - Gorong m' Nilai HSPK 1,068,611.00
Buis Beton dia = 0.5 m (K-175) Tebal (dibulatkan) :
= 5 cm
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.046 O.H 130,000 5,980.00
1.10.28.02.01.001.002 Kepala Tukang 0.018 O.H 120,000 2,160.00
1.10.28.02.01.001.006 Tukang Batu 0.182 O.H 110,000 20,020.00
1.10.28.02.01.002.001 Pekerja 0.912 O.H 90,000 82,080.00
Jumlah Harga Tenaga Kerja 110,240.00
Bahan
2.01.01.03.01.005 Beton K - 175 0.086 m3 1,295,114.00 111,379.80
2.01.01.03.02.020 Bekisting 3.454 m2 203,534.00 703,006.44
Jumlah Harga Bahan 814,386.24
Peralatan
1.3.2.04.01.01.003.00007 Linggis 1inch. x 40cm 0.056 Buah 69,700 3,903.20
9.1.2.09.03.01.001.00067 Kayu Pemikul dan Tampar 0.056 Unit 12,450 697.20
Jumlah Harga Peralatan 4,600.40
Jumlah 929,226.64
Overhead & Profit 15 % 139,384.00

Nilai HSPK : 1,068,611.00


2.01.02.02.05.024 1 m' Pekerjaan Gorong - Gorong m' Nilai HSPK 1,343,280.00
Buis Beton dia = 0.6 m (K-175) Tebal (dibulatkan) :
= 6 cm
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.066 O.H 130,000 8,580.00
1.10.28.02.01.001.002 Kepala Tukang 0.026 O.H 120,000 3,120.00
1.10.28.02.01.001.006 Tukang Batu 0.263 O.H 110,000 28,930.00
1.10.28.02.01.002.001 Pekerja 1.315 O.H 90,000 118,350.00
Jumlah Harga Tenaga Kerja 158,980.00
Bahan
2.01.01.03.01.005 Beton K - 175 0.124 m3 1,295,114.00 160,594.14
2.01.01.03.02.020 Bekisting 4.145 m2 203,534.00 843,648.43
Jumlah Harga Bahan 1,004,242.57
Peralatan
1.3.2.04.01.01.003.00007 Linggis 1inch. x 40cm 0.059 Buah 69,700 4,112.30
9.1.2.09.03.01.001.00067 Kayu Pemikul dan Tampar 0.059 Unit 12,450 734.55
Jumlah Harga Peralatan 4,846.85
Jumlah 1,168,069.42
Overhead & Profit 15 % 175,210.41

Nilai HSPK : 1,343,280.00


2.01.02.02.05.025 1 m' Pekerjaan Gorong-Gorong Buis m' Nilai HSPK 2,264,084.00
Beton Bertulang diameter = 0.8 m (K- (dibulatkan) :
225) tebal = 8 cm

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.119 O.H 130,000 15,470.00
1.10.28.02.01.001.002 Kepala Tukang 0.048 O.H 120,000 5,760.00
1.10.28.02.01.001.006 Tukang Batu 0.477 O.H 110,000 52,470.00
1.10.28.02.01.002.001 Pekerja 2.386 O.H 90,000 214,740.00
Jumlah Harga Tenaga Kerja 288,440.00
Bahan
2.01.01.03.01.007 Buis Beton K - 225 0.221 m3 1,352,157.00 298,826.70
2.01.01.03.01.014 Besi Beton Polos 11.050 Kg 22,769.00 251,597.45
2.01.01.03.02.020 Bekisting 5.526 m2 203,534.00 1,124,728.88
Jumlah Harga Bahan 1,675,153.03
Peralatan
1.3.2.04.01.01.003.00007 Linggis 1inch. x 40cm 0.063 Buah 69,700 4,391.10
9.1.2.09.03.01.001.00067 Kayu Pemikul dan Tampar 0.063 Unit 12,450 784.35
Jumlah Harga Peralatan 5,175.45
Jumlah 1,968,768.48

190
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Overhead & Profit 15 % 295,315.27

Nilai HSPK : 2,264,084.00


2.01.02.02.05.026 1 m' Pekerjaan Gorong - Gorong m' Nilai HSPK 3,129,974.00
Buis Beton Bertulang Diameter = (dibulatkan) :
1.00 m (K-225) tebal = 10 cm

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.186 O.H 130,000 24,180.00
1.10.28.02.01.001.002 Kepala Tukang 0.075 O.H 120,000 9,000.00
1.10.28.02.01.001.006 Tukang Batu 0.746 O.H 110,000 82,060.00
1.10.28.02.01.002.001 Pekerja 3.730 O.H 90,000 335,700.00
Jumlah Harga Tenaga Kerja 450,940.00
Bahan
2.01.01.03.01.007 Buis Beton K - 225 0.345 m3 1,352,157.00 466,494.17
2.01.01.03.01.014 Besi Beton Polos 17.250 Kg 22,769.00 392,765.25
2.01.01.03.02.020 Bekisting (0.2 x VI. D) 6.908 m2 203,534.00 1,406,012.87
Jumlah Harga Bahan 2,265,272.29
Peralatan
1.3.2.04.01.01.003.00007 Linggis 1inch. x 40cm 0.067 Buah 69,700 4,669.90
9.1.2.09.03.01.001.00067 Kayu Pemikul dan Tampar 0.067 Unit 12,450 834.15
Jumlah Harga Peralatan 5,504.05
Jumlah 2,721,716.34
Overhead & Profit 15 % 408,257.45

Nilai HSPK : 3,129,974.00


2.02 HSPK FISIK NON KONSTRUKSI
2.02.03 SARANA DAN PRASARANA KOTA

2.02.03.01 J. PEKERJAAN PENERANGAN JALAN


UMUM
2.02.03.01.01 Pekerjaan Penerangan Jalan Umum
(PJU)
2.02.03.01.01.001 1 Lokasi Persiapan Pemasangan PJU Lokasi Nilai HSPK 923,749.00
(dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
2.02.03.01.01.002 Pembuatan Rambu Lalu Lintas Untuk 2.000 Unit 188,155.00 376,310.00
PJU
2.02.03.01.01.003 Pengukuran Titik Lampu PJU 1.000 Lokasi 425,500.00 425,500.00
1.1.7.01.03.01.014.00060 Cuci Cetak Film 1.000 Lembar 1,450 1,450.00
Jumlah Harga Bahan 803,260.00
Peralatan
Jumlah Harga Peralatan
Jumlah 803,260.00
Overhead & Profit 15 % 120,489.00

Nilai HSPK : 923,749.00


2.02.03.01.01.002 1 Unit Pembuatan Rambu Lalu Lintas Unit Nilai HSPK 188,155.00
Untuk PJU (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.125 OH 130,000 16,250.00
1.10.28.02.01.002.001 Pekerja 0.250 OH 90,000 22,500.00
Jumlah Harga Tenaga Kerja 38,750.00
Bahan
1.1.7.01.01.05.002.00033 Kayu Meranti, Usuk 1.000 Batang 63,900 63,900.00
1.1.7.01.01.05.002.00031 Meranti, Papan, Uk. 2 x 20 x 400 cm 0.500 Batang 110,300 55,150.00

1.1.7.01.01.01.022.00103 Paku Usuk 0.250 Kg 23,250 5,812.50


Jumlah Harga Bahan 124,862.50
Peralatan
Jumlah Harga Peralatan
Jumlah 163,612.50

191
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Overhead & Profit 15 % 24,541.88

Nilai HSPK : 188,155.00


2.02.03.01.01.003 1 Lokasi Pengukuran Titik lampu PJU Lokasi Nilai HSPK 425,500.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.019 Juru ukur 1.000 OH 100,000 100,000.00
1.10.28.02.01.002.001 Pembantu Juru Ukur 3.000 OH 90,000 270,000.00
Jumlah Harga Tenaga Kerja 370,000.00
Bahan
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
Jumlah 370,000.00
Overhead & Profit 15 % 55,500.00

Nilai HSPK : 425,500.00


2.02.03.01.01.004 1 Buah Pemasangan Konektor Kabel Buah Nilai HSPK 1,265.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.004 Tukang Listrik 0.010 OH 110,000 1,100.00
Jumlah Harga Tenaga Kerja 1,100.00
Bahan
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
Jumlah 1,100.00
Overhead & Profit 15 % 165.00

Nilai HSPK : 1,265.00


2.02.03.01.01.005 1 m Pemasangan dan Penarikan m' Nilai HSPK 5,175.00
Kabel (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.050 OH 90,000 4,500.00
Jumlah Harga Tenaga Kerja 4,500.00
Bahan
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
Jumlah 4,500.00
Overhead & Profit 15 % 675.00

Nilai HSPK : 5,175.00


2.02.03.01.01.006 1 m Pemasangan Kabel Bawah m' Nilai HSPK 144,613.00
Tanah (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.025 OH 130,000 3,250.00
1.10.28.02.01.001.011 Tukang Gali Jalan 0.500 OH 110,000 55,000.00
1.10.28.02.01.002.001 Pekerja 0.750 OH 90,000 67,500.00
Jumlah Harga Tenaga Kerja 125,750.00
Bahan
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
Jumlah 125,750.00
Overhead & Profit 15 % 18,862.50

Nilai HSPK : 144,613.00


2.02.03.01.01.007 1 Unit Pemasangan Panel Meter Unit Nilai HSPK 1,639,383.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.500 OH 130,000 65,000.00
1.10.28.02.01.001.004 Tukang Listrik 1.000 OH 110,000 110,000.00
Jumlah Harga Tenaga Kerja 175,000.00

192
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Bahan
1.1.7.01.01.01.008.00063 Besi Beugel/Baut Uk. 6 mm < 60 x 60 1.000 Pasang 73,650 73,650.00

1.3.2.18.01.01.003.00004 Box meter lengkap 1.000 Unit 1,176,900 1,176,900.00


Jumlah Harga Bahan 1,250,550.00
Peralatan
Jumlah Harga Peralatan
Jumlah 1,425,550.00
Overhead & Profit 15 % 213,832.50

Nilai HSPK : 1,639,383.00


2.02.03.01.01.008 1 m Pemasangan PVC untuk Kabel m' Nilai HSPK 86,064.00
Tanam (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.250 O.H 90,000 22,500.00
Jumlah Harga Tenaga Kerja 22,500.00
Bahan
1.1.7.02.02.06.001.00022 Pipa PVC Maspion, AW 2inch. x 4 m 0.250 lonjor 209,350 52,337.50

Jumlah Harga Bahan 52,337.50


Peralatan
Jumlah Harga Peralatan
Jumlah 74,837.50
Overhead & Profit 15 % 11,225.63

Nilai HSPK : 86,064.00


2.02.03.01.01.009 1 m Pemasangan Kabel dalam Pipa m' Nilai HSPK 4,600.00
Pekerjaan Instalasi Jaringan Bawah (dibulatkan) :
Tanah

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.010 OH 130,000 1,300.00
1.10.28.02.01.002.001 Pekerja 0.030 OH 90,000 2,700.00
Jumlah Harga Tenaga Kerja 4,000.00
Bahan
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
Jumlah 4,000.00
Overhead & Profit 15 % 600.00

Nilai HSPK : 4,600.00


2.02.03.01.01.010 1 Unit Pembuatan dan Pemasangan Unit Nilai HSPK 383,238.00
Terminal Dalam Tiang (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.013 Tukang Las 0.125 OH 110,000 13,750.00
1.10.28.02.01.002.001 Pekerja 0.250 OH 90,000 22,500.00
Jumlah Harga Tenaga Kerja 36,250.00
Bahan
1.3.2.18.01.01.003.00023 Terminal Kabel 4 jalur 1.000 Buah 63,950 63,950.00
1.1.7.01.03.08.012.00007 Sekering MCB Thermis 4 - 10 Amp 1.000 Buah 167,900 167,900.00

1.1.7.01.01.01.008.00003 Plat Baja 1.2 mm 0.168 Lembar 387,800 65,150.40


Jumlah Harga Bahan 297,000.40
Peralatan
Jumlah Harga Peralatan
Jumlah 333,250.40
Overhead & Profit 15 % 49,987.56

Nilai HSPK : 383,238.00


2.02.03.01.01.011 1 Unit Perakitan Panel Penerangan Unit Nilai HSPK 189,750.00
Jalan Umum (PJU) (dibulatkan) :

193
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.500 OH 130,000 65,000.00
1.10.28.02.01.001.004 Tukang Listrik 0.500 OH 110,000 55,000.00
1.10.28.02.01.002.001 Pekerja 0.500 OH 90,000 45,000.00
Jumlah Harga Tenaga Kerja 165,000.00
Bahan
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
Jumlah 165,000.00
Overhead & Profit 15 % 24,750.00

Nilai HSPK : 189,750.00


2.02.03.01.01.012 1 Unit Pemasangan Panel Lampu Unit Nilai HSPK 193,200.00
PJU (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.400 OH 130,000 52,000.00
1.10.28.02.01.001.004 Tukang Listrik 0.400 OH 110,000 44,000.00
1.10.28.02.01.002.001 Pekerja 0.800 OH 90,000 72,000.00
Jumlah Harga Tenaga Kerja 168,000.00
Bahan
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
Jumlah 168,000.00
Overhead & Profit 15 % 25,200.00

Nilai HSPK : 193,200.00


2.02.03.01.01.013 1 Unit Pemasangan Panel Tempat Unit Nilai HSPK 144,900.00
Ballast (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.300 OH 130,000 39,000.00
1.10.28.02.01.001.004 Tukang Listrik 0.300 OH 110,000 33,000.00
1.10.28.02.01.002.001 Pekerja 0.600 OH 90,000 54,000.00
Jumlah Harga Tenaga Kerja 126,000.00
Bahan
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
Jumlah 126,000.00
Overhead & Profit 15 % 18,900.00

Nilai HSPK : 144,900.00


2.02.03.01.01.014 1 Buah Panel Tempat Ballast untuk Buah Nilai HSPK 405,720.00
Lampu Sorot (dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
2.02.03.01.01.013 Pemasangan Panel Tempat Ballast 1.000 Unit 144,900.00 144,900.00

1.3.2.18.01.01.003.00006 Panel Ballast 1.000 Unit 207,900 207,900.00


Jumlah Harga Bahan 352,800.00
Peralatan
Jumlah Harga Peralatan
Jumlah 352,800.00
Overhead & Profit 15 % 52,920.00

Nilai HSPK : 405,720.00


2.02.03.01.01.015 1 m Instalasi 1 Titik Lampu PJU m' Nilai HSPK 66,054.00
(Tarikan Udara) 2,5 m (dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan

194
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
2.02.03.01.01.005 Pemasangan dan Penarikan Kabel 2.500 m 5,175.00 12,937.50

1.1.7.01.03.08.001.00009 Kabel NYM Supreme, 2 x 2.5 mm 2.500 m' 17,800 44,500.00

Jumlah Harga Bahan 57,437.50


Peralatan
Jumlah Harga Peralatan
Jumlah 57,437.50
Overhead & Profit 15 % 8,615.63

Nilai HSPK : 66,054.00


2.02.03.01.01.016 1 m Instalasi 1 Titik Lampu PJU m' Nilai HSPK 79,264.00
(Tarikan Udara) 3 m (dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
2.02.03.01.01.005 Pemasangan dan Penarikan Kabel 3.000 m 5,175.00 15,525.00

1.1.7.01.03.08.001.00009 Kabel NYM Supreme, 2 x 2.5 mm 3.000 m' 17,800 53,400.00

Jumlah Harga Bahan 68,925.00


Peralatan
Jumlah Harga Peralatan
Jumlah 68,925.00
Overhead & Profit 15 % 10,338.75

Nilai HSPK : 79,264.00


2.02.03.01.01.017 1 m Instalasi 1 Titik Lampu PJU m' Nilai HSPK 105,685.00
(Tarikan Udara) 4 m (dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
2.02.03.01.01.005 Pemasangan dan Penarikan Kabel 4.000 m 5,175.00 20,700.00

1.1.7.01.03.08.001.00009 Kabel NYM Supreme, 2 x 2.5 mm 4.000 m' 17,800 71,200.00

Jumlah Harga Bahan 91,900.00


Peralatan
Jumlah Harga Peralatan
Jumlah 91,900.00
Overhead & Profit 15 % 13,785.00

Nilai HSPK : 105,685.00


2.02.03.01.01.018 1 m Instalasi 1 Titik Lampu PJU m' Nilai HSPK 184,949.00
(Tarikan Udara) 7 m (dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
2.02.03.01.01.005 Pemasangan dan Penarikan Kabel 7.000 m 5,175.00 36,225.00

1.1.7.01.03.08.001.00009 Kabel NYM Supreme, 2 x 2.5 mm 7.000 m' 17,800 124,600.00

Jumlah Harga Bahan 160,825.00


Peralatan
Jumlah Harga Peralatan
Jumlah 160,825.00
Overhead & Profit 15 % 24,123.75

Nilai HSPK : 184,949.00


2.02.03.01.01.019 1 m Instalasi 1 Titik Lampu PJU m' Nilai HSPK 224,581.00
(Tarikan Udara) 8.5 m (dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan

195
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
2.02.03.01.01.005 Pemasangan dan Penarikan Kabel 8.500 m 5,175.00 43,987.50

1.1.7.01.03.08.001.00009 Kabel NYM Supreme, 2 x 2.5 mm 8.500 m' 17,800 151,300.00

Jumlah Harga Bahan 195,287.50


Peralatan
Jumlah Harga Peralatan
Jumlah 195,287.50
Overhead & Profit 15 % 29,293.13

Nilai HSPK : 224,581.00


2.02.03.01.01.020 1 Unit Roll Pipa 1,5inch. Unit Nilai HSPK 121,020.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.008 Tukang Besi 0.107 OH 110,000 11,737.00
1.10.28.02.01.002.001 Pekerja 0.213 OH 90,000 19,197.00
Jumlah Harga Tenaga Kerja 30,934.00
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.09.03.01.001.00054 Alat Bantu Roll Pipa 1.000 Jam 74,300 74,300.00
Jumlah Harga Peralatan 74,300.00
Jumlah 105,234.00
Overhead & Profit 15 % 15,785.10

Nilai HSPK : 121,020.00


2.02.03.01.01.021 1 Unit Roll Pipa 2inch. Unit Nilai HSPK 129,911.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.008 Tukang Besi 0.133 OH 110,000 14,663.00
1.10.28.02.01.002.001 Pekerja 0.267 OH 90,000 24,003.00
Jumlah Harga Tenaga Kerja 38,666.00
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.09.03.01.001.00054 Alat Bantu Roll Pipa 1.000 Jam 74,300 74,300.00
Jumlah Harga Peralatan 74,300.00
Jumlah 112,966.00
Overhead & Profit 15 % 16,944.90

Nilai HSPK : 129,911.00


2.02.03.01.01.022 1 Unit Roll Pipa 3inch. Unit Nilai HSPK 168,820.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.008 Tukang Besi 0.250 OH 110,000 27,500.00
1.10.28.02.01.002.001 Pekerja 0.500 OH 90,000 45,000.00
Jumlah Harga Tenaga Kerja 72,500.00
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.09.03.01.001.00054 Alat Bantu Roll Pipa 1.000 Jam 74,300 74,300.00
Jumlah Harga Peralatan 74,300.00
Jumlah 146,800.00
Overhead & Profit 15 % 22,020.00

Nilai HSPK : 168,820.00


2.02.03.01.01.023 1 Unit Roll Pipa 4inch. Unit Nilai HSPK 218,845.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.008 Tukang Besi 0.400 OH 110,000 44,000.00
1.10.28.02.01.002.001 Pekerja 0.800 OH 90,000 72,000.00
Jumlah Harga Tenaga Kerja 116,000.00
Bahan
Jumlah Harga Bahan

196
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Peralatan
9.1.2.09.03.01.001.00054 Alat Bantu Roll Pipa 1.000 Jam 74,300 74,300.00
Jumlah Harga Peralatan 74,300.00
Jumlah 190,300.00
Overhead & Profit 15 % 28,545.00

Nilai HSPK : 218,845.00


2.02.03.01.01.024 1 Buah Pemasangan Ornamen Buah Nilai HSPK 779,325.00
Lampu PJU panjang 1,5 m (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.125 O.H 130,000 16,250.00
1.10.28.02.01.001.004 Tukang Listrik 0.200 O.H 110,000 22,000.00
1.10.28.02.01.002.001 Pekerja 0.600 O.H 90,000 54,000.00
Jumlah Harga Tenaga Kerja 92,250.00
Bahan
1.1.7.02.02.07.001.00006 Pipa Galvanis Dia, 2inch. @6m 0.250 Batang 638,450 159,612.50
Medium A
1.1.7.01.01.01.008.00063 Besi Beugel/Baut Uk. 6 mm < 60 x 60 2.000 Pasang 73,650 147,300.00

2.02.03.01.01.021 Roll Pipa 2inch. 1.000 Unit 129,911.00 129,911.00


Jumlah Harga Bahan 436,823.50
Peralatan
9.1.2.09.03.01.001.00053 Alat Bantu Penerangan Jalan Umum 2.000 Jam 74,300 148,600.00

Jumlah Harga Peralatan 148,600.00


Jumlah 677,673.50
Overhead & Profit 15 % 101,651.03

Nilai HSPK : 779,325.00


2.02.03.01.01.025 1 Buah Pemasangan Ornamen Buah Nilai HSPK 840,559.00
Lampu PJU panjang 2 m (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.125 O.H 130,000 16,250.00
1.10.28.02.01.001.004 Tukang Listrik 0.200 O.H 110,000 22,000.00
1.10.28.02.01.002.001 Pekerja 0.600 O.H 90,000 54,000.00
Jumlah Harga Tenaga Kerja 92,250.00
Bahan
1.1.7.02.02.07.001.00006 Pipa Galvanis Dia, 2inch. @6m 0.333 Batang 638,450 212,859.23
Medium A
1.1.7.01.01.01.008.00063 Besi Beugel/Baut Uk. 6 mm < 60 x 60 2.000 Pasang 73,650 147,300.00

2.02.03.01.01.021 Roll Pipa 2inch. 1.000 Unit 129,911.00 129,911.00


Jumlah Harga Bahan 490,070.23
Peralatan
9.1.2.09.03.01.001.00053 Alat Bantu Penerangan Jalan Umum 2.000 Jam 74,300 148,600.00

Jumlah Harga Peralatan 148,600.00


Jumlah 730,920.23
Overhead & Profit 15 % 109,638.03

Nilai HSPK : 840,559.00


2.02.03.01.01.026 1 Buah Pemasangan Ornamen Buah Nilai HSPK 1,029,867.00
Lampu PJU panjang 3 m (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.125 O.H 130,000 16,250.00
1.10.28.02.01.001.004 Tukang Listrik 0.200 O.H 110,000 22,000.00
1.10.28.02.01.002.001 Pekerja 0.600 O.H 90,000 54,000.00
Jumlah Harga Tenaga Kerja 92,250.00
Bahan
1.1.7.02.02.07.001.00006 Pipa Galvanis Dia, 2inch. @6m 0.500 Batang 638,450 319,225.00
Medium A

197
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
1.1.7.01.01.01.008.00063 Besi Beugel/Baut Uk. 6 mm < 60 x 60 2.000 Pasang 73,650 147,300.00

1.1.7.01.01.01.008.00009 Plat Baja Tebal 5 mm 5.000 Kg 11,650 58,250.00


2.02.03.01.01.021 Roll Pipa 2inch. 1.000 Unit 129,911.00 129,911.00
Jumlah Harga Bahan 654,686.00
Peralatan
9.1.2.09.03.01.001.00053 Alat Bantu Penerangan Jalan Umum 2.000 Jam 74,300 148,600.00

Jumlah Harga Peralatan 148,600.00


Jumlah 895,536.00
Overhead & Profit 15 % 134,330.40

Nilai HSPK : 1,029,867.00


2.02.03.01.01.027 1 Buah Pemasangan Ornamen Buah Nilai HSPK 1,455,008.00
Lampu PJU Panjang 6 m (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.125 O.H 130,000 16,250.00
1.10.28.02.01.001.004 Tukang Listrik 0.200 O.H 110,000 22,000.00
1.10.28.02.01.002.001 Pekerja 0.600 O.H 90,000 54,000.00
Jumlah Harga Tenaga Kerja 92,250.00
Bahan
1.1.7.02.02.07.001.00006 Pipa Galvanis Dia, 2inch. @6m 1.000 Batang 638,450 638,450.00
Medium A
1.1.7.01.01.01.008.00063 Besi Beugel/Baut Uk. 6 mm < 60 x 60 3.000 Pasang 73,650 220,950.00

1.1.7.01.01.01.012.00002 Besi Beton Dia, 12 mm, 12m 0.330 Ljr 106,250 35,062.50
2.02.03.01.01.021 Roll Pipa 2inch. 1.000 Unit 129,911.00 129,911.00
Jumlah Harga Bahan 1,024,373.50
Peralatan
9.1.2.09.03.01.001.00053 Alat Bantu Penerangan Jalan Umum 2.000 Jam 74,300 148,600.00

Jumlah Harga Peralatan 148,600.00


Jumlah 1,265,223.50
Overhead & Profit 15 % 189,783.53

Nilai HSPK : 1,455,008.00


2.02.03.01.01.028 1 Unit Pemasangan Panel Lampu Unit Nilai HSPK 5,385,680.00
PJU 1 Phase 4400 VA (dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
2.02.03.01.01.011 Perakitan Panel PJU 1.000 Unit 189,750.00 189,750.00
2.02.03.01.01.012 Pemasangan Panel PJU 1.000 Unit 193,200.00 193,200.00
1.3.2.18.01.01.003.00206 Panel PJU 1.000 Buah 1,872,300 1,872,300.00
1.1.7.01.03.08.012.00017 Time Switch 1.000 Buah 502,000 502,000.00
1.3.2.18.01.01.003.00044 MCB Schneider, MG Domae, 1 Phase 1.000 Buah 158,100 158,100.00
4.5 kA, 63 A
1.3.2.18.01.01.003.00036 MCB Schneider, MG Domae, 1 Phase 1.000 Buah 50,600 50,600.00
4.5 kA, 6 A
1.3.2.18.01.01.003.00053 MCB Schneider, MG Domae, 1 Phase 4.000 Buah 127,800 511,200.00
C60N 6 kA, 40 A
1.1.7.01.03.08.012.00001 Kontaktor Mitsubhisi, SN 50 1.000 Buah 779,600 779,600.00
1.3.2.18.01.01.003.00201 Grounding Roud 1.000 Unit 352,800 352,800.00
1.1.7.01.01.01.008.00063 Besi Beugel/Baut Uk. 6 mm < 60 x 60 1.000 Pasang 73,650 73,650.00

Jumlah Harga Bahan 4,683,200.00


Peralatan
Jumlah Harga Peralatan
Jumlah 4,683,200.00
Overhead & Profit 15 % 702,480.00

Nilai HSPK : 5,385,680.00

198
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
2.02.03.01.01.029 1 Unit Pemasangan Panel Lampu Unit Nilai HSPK 6,104,890.00
PJU 3 Phase 6600VA (dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
2.02.03.01.01.011 Perakitan Panel PJU 1.000 Unit 189,750.00 189,750.00
2.02.03.01.01.012 Pemasangan Panel PJU 1.000 Unit 193,200.00 193,200.00
1.3.2.18.01.01.003.00206 Panel PJU 1.000 Buah 1,872,300 1,872,300.00
1.1.7.01.03.08.002.00049 Pilot Lamp 3.000 Buah 96,100 288,300.00
1.3.2.18.01.01.003.00058 MCB Schneider, MG Domae, 3 Phase 2.000 Buah 239,300 478,600.00
4,5 kA, 16 A
1.3.2.18.01.01.003.00047 MCB Schneider, MG Domae, 1 Phase 6.000 Buah 96,400 578,400.00
C60N 6 kA, 6 A
1.1.7.01.03.08.012.00001 Kontaktor Mitsubhisi, SN 50 1.000 Buah 779,600 779,600.00
1.1.7.01.03.08.012.00017 Time Switch 1.000 Buah 502,000 502,000.00
1.3.2.18.01.01.003.00201 Grounding Roud 1.000 Unit 352,800 352,800.00
1.1.7.01.01.01.008.00063 Besi Beugel/Baut Uk. 6 mm < 60 x 60 1.000 Pasang 73,650 73,650.00

Jumlah Harga Bahan 5,308,600.00


Peralatan
Jumlah Harga Peralatan
Jumlah 5,308,600.00
Overhead & Profit 15 % 796,290.00

Nilai HSPK : 6,104,890.00


2.02.03.01.01.030 1 Unit Pemasangan Panel Lampu Unit Nilai HSPK 6,104,890.00
PJU 3 Phase 10600VA (dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
2.02.03.01.01.011 Perakitan Panel PJU 1.000 Unit 189,750.00 189,750.00
2.02.03.01.01.012 Pemasangan Panel PJU 1.000 Unit 193,200.00 193,200.00
1.3.2.18.01.01.003.00206 Panel PJU 1.000 Buah 1,872,300 1,872,300.00
1.1.7.01.03.08.002.00049 Pilot Lamp 3.000 Buah 96,100 288,300.00
1.3.2.18.01.01.003.00059 MCB Schneider, MG Domae, 3 Phase 2.000 Buah 239,300 478,600.00
4,5 kA, 20 A
1.3.2.18.01.01.003.00048 MCB Schneider, MG Domae, 1 Phase 6.000 Buah 96,400 578,400.00
C60N 6 kA, 10 A
1.1.7.01.03.08.012.00001 Kontaktor Mitsubhisi, SN 50 1.000 Buah 779,600 779,600.00
1.1.7.01.03.08.012.00017 Time Switch 1.000 Buah 502,000 502,000.00
1.3.2.18.01.01.003.00201 Grounding Roud 1.000 Unit 352,800 352,800.00
1.1.7.01.01.01.008.00063 Besi Beugel/Baut Uk. 6 mm < 60 x 60 1.000 Pasang 73,650 73,650.00

Jumlah Harga Bahan 5,308,600.00


Peralatan
Jumlah Harga Peralatan
Jumlah 5,308,600.00
Overhead & Profit 15 % 796,290.00

Nilai HSPK : 6,104,890.00


2.02.03.01.01.031 1 Unit Pemasangan Panel Lampu Unit Nilai HSPK 6,152,960.00
PJU 3 Phase 13200VA (dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
2.02.03.01.01.011 Perakitan Panel PJU 1.000 Unit 189,750.00 189,750.00
2.02.03.01.01.012 Pemasangan Panel PJU 1.000 Unit 193,200.00 193,200.00
1.3.2.18.01.01.003.00206 Panel PJU 1.000 Buah 1,872,300 1,872,300.00
1.1.7.01.03.08.002.00049 Pilot Lamp 3.000 Buah 96,100 288,300.00
1.3.2.18.01.01.003.00060 MCB Schneider, MG Domae, 3 Phase 2.000 Buah 260,200 520,400.00
4,5 kA, 25 A
1.3.2.18.01.01.003.00049 MCB Schneider, MG Domae, 1 Phase 6.000 Buah 96,400 578,400.00
C60N 6 kA, 16 A
1.1.7.01.03.08.012.00001 Kontaktor Mitsubhisi, SN 50 1.000 Buah 779,600 779,600.00

199
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
1.1.7.01.03.08.012.00017 Time Switch 1.000 Buah 502,000 502,000.00
1.3.2.18.01.01.003.00201 Grounding Roud 1.000 Unit 352,800 352,800.00
1.1.7.01.01.01.008.00063 Besi Beugel/Baut Uk. 6 mm < 60 x 60 1.000 Pasang 73,650 73,650.00

Jumlah Harga Bahan 5,350,400.00


Peralatan
Jumlah Harga Peralatan
Jumlah 5,350,400.00
Overhead & Profit 15 % 802,560.00

Nilai HSPK : 6,152,960.00


2.02.03.01.01.032 1 Unit Pemasangan Panel Lampu Unit Nilai HSPK 6,208,160.00
PJU 3 Phase 16500VA (dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
2.02.03.01.01.011 Perakitan Panel PJU 1.000 Unit 189,750.00 189,750.00
2.02.03.01.01.012 Pemasangan Panel PJU 1.000 Unit 193,200.00 193,200.00
1.3.2.18.01.01.003.00206 Panel PJU 1.000 Buah 1,872,300 1,872,300.00
1.1.7.01.03.08.002.00049 Pilot Lamp 3.000 Buah 96,100 288,300.00
1.3.2.18.01.01.003.00061 MCB Schneider, MG Domae, 3 Phase 2.000 Buah 284,200 568,400.00
4,5 kA, 32 A
1.3.2.18.01.01.003.00049 MCB Schneider, MG Domae, 1 Phase 6.000 Buah 96,400 578,400.00
C60N 6 kA, 16 A
1.1.7.01.03.08.012.00001 Kontaktor Mitsubhisi, SN 50 1.000 Buah 779,600 779,600.00
1.1.7.01.03.08.012.00017 Time Switch 1.000 Buah 502,000 502,000.00
1.3.2.18.01.01.003.00201 Grounding Roud 1.000 Unit 352,800 352,800.00
1.1.7.01.01.01.008.00063 Besi Beugel/Baut Uk. 6 mm < 60 x 60 1.000 Pasang 73,650 73,650.00

Jumlah Harga Bahan 5,398,400.00


Peralatan
Jumlah Harga Peralatan
Jumlah 5,398,400.00
Overhead & Profit 15 % 809,760.00

Nilai HSPK : 6,208,160.00


2.02.03.01.01.033 1 Unit Pemasangan Panel Lampu Unit Nilai HSPK 6,294,640.00
PJU 3 Phase 23000VA (dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
2.02.03.01.01.011 Perakitan Panel PJU 1.000 Unit 189,750.00 189,750.00
2.02.03.01.01.012 Pemasangan Panel PJU 1.000 Unit 193,200.00 193,200.00
1.3.2.18.01.01.003.00206 Panel PJU 1.000 Buah 1,872,300 1,872,300.00
1.1.7.01.03.08.002.00049 Pilot Lamp 3.000 Buah 96,100 288,300.00
1.3.2.18.01.01.003.00062 MCB Schneider, MG Domae, 3 Phase 2.000 Buah 297,500 595,000.00
4,5 kA, 40 A
1.3.2.18.01.01.003.00050 MCB Schneider, MG Domae, 1 Phase 6.000 Buah 104,500 627,000.00
C60N 6 kA, 20 A
1.1.7.01.03.08.012.00001 Kontaktor Mitsubhisi, SN 50 1.000 Buah 779,600 779,600.00
1.1.7.01.03.08.012.00017 Time Switch 1.000 Buah 502,000 502,000.00
1.3.2.18.01.01.003.00201 Grounding Roud 1.000 Unit 352,800 352,800.00
1.1.7.01.01.01.008.00063 Besi Beugel/Baut Uk. 6 mm < 60 x 60 1.000 Pasang 73,650 73,650.00

Jumlah Harga Bahan 5,473,600.00


Peralatan
Jumlah Harga Peralatan
Jumlah 5,473,600.00
Overhead & Profit 15 % 821,040.00

Nilai HSPK : 6,294,640.00


2.02.03.01.01.034 1 Unit Pemasangan Panel Lampu Unit Nilai HSPK 7,121,950.00
PJU 3 Phase 33000VA (dibulatkan) :
Tenaga Kerja

200
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Jumlah Harga Tenaga Kerja
Bahan
2.02.03.01.01.011 Perakitan Panel PJU 1.000 Unit 189,750.00 189,750.00
2.02.03.01.01.012 Pemasangan Panel PJU 1.000 Unit 193,200.00 193,200.00
1.3.2.18.01.01.003.00206 Panel PJU 1.000 Buah 1,872,300 1,872,300.00
1.1.7.01.03.08.002.00049 Pilot Lamp 3.000 Buah 96,100 288,300.00
1.3.2.18.01.01.003.00072 MCB Schneider, MG Domae, 3 2.000 Buah 639,800 1,279,600.00
PhaseC60N 6 kA, 50 A
1.3.2.18.01.01.003.00051 MCB Schneider, MG Domae, 1 Phase 6.000 Buah 110,300 661,800.00
C60N 6 kA, 25 A
1.1.7.01.03.08.012.00001 Kontaktor Mitsubhisi, SN 50 1.000 Buah 779,600 779,600.00
1.1.7.01.03.08.012.00017 Time Switch 1.000 Buah 502,000 502,000.00
1.3.2.18.01.01.003.00201 Grounding Roud 1.000 Unit 352,800 352,800.00
1.1.7.01.01.01.008.00063 Besi Beugel/Baut Uk. 6 mm < 60 x 60 1.000 Pasang 73,650 73,650.00

Jumlah Harga Bahan 6,193,000.00


Peralatan
Jumlah Harga Peralatan
Jumlah 6,193,000.00
Overhead & Profit 15 % 928,950.00

Nilai HSPK : 7,121,950.00


2.02.03.01.02 Elektrikal
2.02.03.01.02.001 1 Unit Pembongkaran Instalasi Kabel Unit Nilai HSPK 69,690.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.020 O.H 130,000 2,600.00
1.10.28.02.01.001.004 Tukang Listrik 0.200 O.H 110,000 22,000.00
1.10.28.02.01.002.001 Pekerja 0.400 O.H 90,000 36,000.00
Jumlah Harga Tenaga Kerja 60,600.00
Bahan
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
Jumlah 60,600.00
Overhead & Profit 15 % 9,090.00

Nilai HSPK : 69,690.00


2.02.03.01.02.002 1 Unit Bongkar Panel Unit Nilai HSPK 139,380.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.040 O.H 130,000 5,200.00
1.10.28.02.01.001.004 Tukang Listrik 0.400 O.H 110,000 44,000.00
1.10.28.02.01.002.001 Pekerja 0.800 O.H 90,000 72,000.00
Jumlah Harga Tenaga Kerja 121,200.00
Bahan
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
Jumlah 121,200.00
Overhead & Profit 15 % 18,180.00

Nilai HSPK : 139,380.00


2.02.03.01.02.003 1 Unit Bongkar Kap Lampu Taman Unit Nilai HSPK 330,395.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.100 O.H 130,000 13,000.00
1.10.28.02.01.001.004 Tukang Listrik 1.000 O.H 110,000 110,000.00
1.10.28.02.01.002.001 Pekerja 1.000 O.H 90,000 90,000.00
Jumlah Harga Tenaga Kerja 213,000.00
Bahan
Jumlah Harga Bahan
Peralatan

201
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
9.1.2.09.03.01.001.00053 Alat Bantu Penerangan Jalan Umum 1.000 Jam 74,300 74,300.00

Jumlah Harga Peralatan 74,300.00


Jumlah 287,300.00
Overhead & Profit 15 % 43,095.00

Nilai HSPK : 330,395.00


2.02.03.01.02.004 1 Unit Bongkar Tiang Lampu Tanam Unit Nilai HSPK 440,795.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.300 O.H 130,000 39,000.00
1.10.28.02.01.002.001 Pekerja 3.000 O.H 90,000 270,000.00
Jumlah Harga Tenaga Kerja 309,000.00
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.09.03.01.001.00053 Alat Bantu Penerangan Jalan Umum 1.000 Jam 74,300 74,300.00

Jumlah Harga Peralatan 74,300.00


Jumlah 383,300.00
Overhead & Profit 15 % 57,495.00

Nilai HSPK : 440,795.00


2.02.03.01.02.005 1 m Pemasangan/Penarikan Kabel m' Nilai HSPK 122,062.00
NYFGBY 4x 6 mm (dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
2.01.01.01.02.004 Galian Tanah Keras 0.080 m3 108,284.00 8,662.72
2.01.01.01.02.009 Urugan Tanah Kembali 0.040 m3 59,225.00 2,369.00
2.02.03.01.01.009 Pemasangan Kabel dalam Pipa 1.000 m 4,600.00 4,600.00
Pekerjaan Instalasi Jaringan Bawah
Tanah
1.1.7.01.03.08.001.00030 Kabel NYFGBY/NYRGBY Supreme, 4 x 1.000 m' 69,900 69,900.00
6 mm
1.1.7.01.01.01.005.00010 Batu Bata Merah, Kelas 1 5.000 Buah 871 4,353.86
1.1.7.01.01.01.004.00003 Pasir Urug 0.100 m3 162,550 16,255.00
Jumlah Harga Bahan 106,140.58
Peralatan
Jumlah Harga Peralatan
Jumlah 106,140.58
Overhead & Profit 15 % 15,921.09

Nilai HSPK : 122,062.00


2.02.03.01.02.006 1 m Pemasangan/Penarikan Kabel m' Nilai HSPK 157,655.00
NYFGBY 4x 10 mm (dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
2.01.01.01.02.004 Galian Tanah Keras 0.080 m3 108,284.00 8,662.72
2.01.01.01.02.009 Urugan Tanah Kembali 0.040 m3 59,225.00 2,369.00
2.02.03.01.01.009 Pemasangan Kabel dalam Pipa 1.000 m 4,600.00 4,600.00
Pekerjaan Instalasi Jaringan Bawah
Tanah
1.1.7.01.03.08.001.00031 Kabel NYFGBY/NYRGBY Supreme, 4 x 1.000 m' 100,850 100,850.00
10 mm
1.1.7.01.01.01.005.00010 Batu Bata Merah, Kelas 1 5.000 Buah 871 4,353.86
1.1.7.01.01.01.004.00003 Pasir Urug 0.100 m3 162,550 16,255.00
Jumlah Harga Bahan 137,090.58
Peralatan
Jumlah Harga Peralatan
Jumlah 137,090.58
Overhead & Profit 15 % 20,563.59

202
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Nilai HSPK : 157,655.00
2.02.03.01.02.007 1 m Pemasangan/Penarikan Kabel m' Nilai HSPK 189,510.00
NYFGBY 4x 16 mm (dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
2.01.01.01.02.004 Galian Tanah Keras 0.080 m3 108,284.00 8,662.72
2.01.01.01.02.009 Urugan Tanah Kembali 0.040 m3 59,225.00 2,369.00
2.02.03.01.01.009 Pemasangan Kabel dalam Pipa 1.000 m 4,600.00 4,600.00
Pekerjaan Instalasi Jaringan Bawah
Tanah
1.1.7.01.03.08.001.00032 Kabel NYFGBY/NYRGBY Supreme, 4 x 1.000 m' 128,550 128,550.00
16 mm
1.1.7.01.01.01.005.00010 Batu Bata Merah, Kelas 1 5.000 Buah 871 4,353.86
1.1.7.01.01.01.004.00003 Pasir Urug 0.100 m3 162,550 16,255.00
Jumlah Harga Bahan 164,790.58
Peralatan
Jumlah Harga Peralatan
Jumlah 164,790.58
Overhead & Profit 15 % 24,718.59

Nilai HSPK : 189,510.00


2.02.03.01.02.008 1 m Pemasangan/Penarikan Kabel m' Nilai HSPK 86,585.00
NYFGBY/NYRGBY 4 x 2,5 mm (dibulatkan) :

Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
2.01.01.01.02.004 Galian Tanah Keras 0.080 m3 108,284.00 8,662.72
2.01.01.01.02.009 Urugan Tanah Kembali 0.040 m3 59,225.00 2,369.00
2.02.03.01.01.009 Pemasangan Kabel dalam Pipa 1.000 m 4,600.00 4,600.00
Pekerjaan Instalasi Jaringan Bawah
Tanah
1.1.7.01.03.08.001.00028 Kabel NYFGBY/NYRGBY Supreme, 4 x 1.000 m' 39,050 39,050.00
2,5 mm
1.1.7.01.01.01.005.00010 Batu Bata Merah, Kelas 1 5.000 Buah 871 4,353.86
1.1.7.01.01.01.004.00003 Pasir Urug 0.100 m3 162,550 16,255.00
Jumlah Harga Bahan 75,290.58
Peralatan
Jumlah Harga Peralatan
Jumlah 75,290.58
Overhead & Profit 15 % 11,293.59

Nilai HSPK : 86,585.00


2.02.03.01.02.009 1 m Pemasangan/Penarikan Kabel m' Nilai HSPK 103,490.00
NYFGBY/NYRGBY 4 x 4 mm (dibulatkan) :

Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
2.01.01.01.02.004 Galian Tanah Keras 0.080 m3 108,284.00 8,662.72
2.01.01.01.02.009 Urugan Tanah Kembali 0.040 m3 59,225.00 2,369.00
2.02.03.01.01.009 Pemasangan Kabel dalam Pipa 1.000 m 4,600.00 4,600.00
Pekerjaan Instalasi Jaringan Bawah
Tanah
1.1.7.01.03.08.001.00029 Kabel NYFGBY/NYRGBY Supreme, 4 x 1.000 m' 53,750 53,750.00
4 mm
1.1.7.01.01.01.005.00010 Batu Bata Merah, Kelas 1 5.000 Buah 871 4,353.86
1.1.7.01.01.01.004.00003 Pasir Urug 0.100 m3 162,550 16,255.00
Jumlah Harga Bahan 89,990.58
Peralatan
Jumlah Harga Peralatan
Jumlah 89,990.58
Overhead & Profit 15 % 13,498.59

203
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f

Nilai HSPK : 103,490.00


2.02.03.01.02.010 1 m Pemasangan/Penarikan Kabel m' Nilai HSPK 75,401.00
NYY 4 x 2.5 mm (dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
2.01.01.01.02.004 Galian Tanah Keras 0.080 m3 108,284.00 8,662.72
2.01.01.01.02.009 Urugan Tanah Kembali 0.040 m3 59,225.00 2,369.00
2.02.03.01.01.005 Pemasangan dan Penarikan Kabel 1.000 m 5,175.00 5,175.00

1.1.7.01.03.08.001.00018 Kabel NYY Supreme, 4 x 2,5 mm 1.000 m' 28,750 28,750.00


1.1.7.01.01.01.005.00010 Batu Bata Merah, Kelas 1 5.000 Buah 871 4,353.86
1.1.7.01.01.01.004.00003 Pasir Urug 0.100 m3 162,550 16,255.00
Jumlah Harga Bahan 65,565.58
Peralatan
Jumlah Harga Peralatan
Jumlah 65,565.58
Overhead & Profit 15 % 9,834.84

Nilai HSPK : 75,401.00


2.02.03.01.02.011 1 m Pemasangan/Penarikan Kabel m' Nilai HSPK 97,423.00
NYY 4 x 4 mm (dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
2.01.01.01.02.004 Galian Tanah Keras 0.080 m3 108,284.00 8,662.72
2.01.01.01.02.009 Urugan Tanah Kembali 0.040 m3 59,225.00 2,369.00
2.02.03.01.01.005 Pemasangan dan Penarikan Kabel 1.000 m 5,175.00 5,175.00

1.1.7.01.03.08.001.00020 Kabel NYY Supreme, 4 x 4 mm 1.000 m' 47,900 47,900.00


1.1.7.01.01.01.005.00010 Batu Bata Merah, Kelas 1 5.000 Buah 871 4,353.86
1.1.7.01.01.01.004.00003 Pasir Urug 0.100 m3 162,550 16,255.00
Jumlah Harga Bahan 84,715.58
Peralatan
Jumlah Harga Peralatan
Jumlah 84,715.58
Overhead & Profit 15 % 12,707.34

Nilai HSPK : 97,423.00


2.02.03.01.02.012 1 m Pemasangan/Penarikan Kabel m' Nilai HSPK 113,121.00
NYY 4 x 6 mm (dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
2.01.01.01.02.004 Galian Tanah Keras 0.080 m3 108,284.00 8,662.72
2.01.01.01.02.009 Urugan Tanah Kembali 0.040 m3 59,225.00 2,369.00
2.02.03.01.01.005 Pemasangan dan Penarikan Kabel 1.000 m 5,175.00 5,175.00

1.1.7.01.03.08.001.00021 Kabel NYY Supreme, 4 x 6 mm 1.000 m' 61,550 61,550.00


1.1.7.01.01.01.005.00010 Batu Bata Merah, Kelas 1 5.000 Buah 871 4,353.86
1.1.7.01.01.01.004.00003 Pasir Urug 0.100 m3 162,550 16,255.00
Jumlah Harga Bahan 98,365.58
Peralatan
Jumlah Harga Peralatan
Jumlah 98,365.58
Overhead & Profit 15 % 14,754.84

Nilai HSPK : 113,121.00


2.02.03.01.02.013 1 m Pemasangan/Penarikan kabel m' Nilai HSPK 150,898.00
NYY 4 x 10 mm2 (dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan

204
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
2.01.01.01.02.004 Galian Tanah Keras 0.080 m3 108,284.00 8,662.72
2.01.01.01.02.009 Urugan Tanah Kembali 0.040 m3 59,225.00 2,369.00
2.02.03.01.01.005 Pemasangan dan Penarikan Kabel 1.000 m 5,175.00 5,175.00

1.1.7.01.03.08.001.00022 Kabel NYY Supreme, 4 x 10 mm 1.000 m' 94,400 94,400.00


1.1.7.01.01.01.005.00010 Batu Bata Merah, Kelas 1 5.000 Buah 871 4,353.86
1.1.7.01.01.01.004.00003 Pasir Urug 0.100 m3 162,550 16,255.00
Jumlah Harga Bahan 131,215.58
Peralatan
Jumlah Harga Peralatan
Jumlah 131,215.58
Overhead & Profit 15 % 19,682.34

Nilai HSPK : 150,898.00


2.02.03.01.02.014 1 m Pemasangan/Penarikan Kabel m' Nilai HSPK 172,633.00
NYY 4 x 16 mm (dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
2.01.01.01.02.004 Galian Tanah Keras 0.080 m3 108,284.00 8,662.72
2.01.01.01.02.009 Urugan Tanah Kembali 0.040 m3 59,225.00 2,369.00
2.02.03.01.01.005 Pemasangan dan Penarikan Kabel 1.000 m 5,175.00 5,175.00

1.1.7.01.03.08.001.00023 Kabel NYY Supreme, 4 x 16 mm 1.000 m' 113,300 113,300.00


1.1.7.01.01.01.005.00010 Batu Bata Merah, Kelas 1 5.000 Buah 871 4,353.86
1.1.7.01.01.01.004.00003 Pasir Urug 0.100 m3 162,550 16,255.00
Jumlah Harga Bahan 150,115.58
Peralatan
Jumlah Harga Peralatan
Jumlah 150,115.58
Overhead & Profit 15 % 22,517.34

Nilai HSPK : 172,633.00


2.02.03.01.02.015 1 m Pemasangan/Penarikan Kabel m' Nilai HSPK 245,026.00
NYY 4 x 25 mm (dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
2.01.01.01.02.004 Galian Tanah Keras 0.080 m3 108,284.00 8,662.72
2.01.01.01.02.009 Urugan Tanah Kembali 0.040 m3 59,225.00 2,369.00
2.02.03.01.01.005 Pemasangan dan Penarikan Kabel 1.000 m 5,175.00 5,175.00

1.1.7.01.03.08.001.00024 Kabel NYY Supreme, 4 x 25 mm 1.000 m' 176,250 176,250.00


1.1.7.01.01.01.005.00010 Batu Bata Merah, Kelas 1 5.000 Buah 871 4,353.86
1.1.7.01.01.01.004.00003 Pasir Urug 0.100 m3 162,550 16,255.00
Jumlah Harga Bahan 213,065.58
Peralatan
Jumlah Harga Peralatan
Jumlah 213,065.58
Overhead & Profit 15 % 31,959.84

Nilai HSPK : 245,026.00


2.02.03.01.02.016 1 m Pemasangan/Penarikan Kabel m' Nilai HSPK 317,361.00
NYY 4 x 35 mm (dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
2.01.01.01.02.004 Galian Tanah Keras 0.080 m3 108,284.00 8,662.72
2.01.01.01.02.009 Urugan Tanah Kembali 0.040 m3 59,225.00 2,369.00
2.02.03.01.01.005 Pemasangan dan Penarikan Kabel 1.000 m 5,175.00 5,175.00

1.1.7.01.03.08.001.00025 Kabel NYY Supreme, 4 x 35 mm 1.000 m' 239,150 239,150.00


1.1.7.01.01.01.005.00010 Batu Bata Merah, Kelas 1 5.000 Buah 871 4,353.86
1.1.7.01.01.01.004.00003 Pasir Urug 0.100 m3 162,550 16,255.00

205
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Jumlah Harga Bahan 275,965.58
Peralatan
Jumlah Harga Peralatan
Jumlah 275,965.58
Overhead & Profit 15 % 41,394.84

Nilai HSPK : 317,361.00


2.02.03.01.02.017 1 m Pemasangan/Penarikan Kabel m' Nilai HSPK 20,154.00
NYM 2x1,5 mm (dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
2.02.03.01.01.005 Pemasangan dan Penarikan Kabel 1.000 m 5,175.00 5,175.00

1.1.7.01.03.08.001.00008 Kabel NYM Supreme, 2 x 1.5 mm 1.000 m' 12,350 12,350.00

Jumlah Harga Bahan 17,525.00


Peralatan
Jumlah Harga Peralatan
Jumlah 17,525.00
Overhead & Profit 15 % 2,628.75

Nilai HSPK : 20,154.00


2.02.03.01.02.018 1 m Pemasangan/Penarikan Kabel m' Nilai HSPK 26,422.00
NYM 2x2,5 mm (dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
2.02.03.01.01.005 Pemasangan dan Penarikan Kabel 1.000 m 5,175.00 5,175.00

1.1.7.01.03.08.001.00009 Kabel NYM Supreme, 2 x 2.5 mm 1.000 m' 17,800 17,800.00

Jumlah Harga Bahan 22,975.00


Peralatan
Jumlah Harga Peralatan
Jumlah 22,975.00
Overhead & Profit 15 % 3,446.25

Nilai HSPK : 26,422.00


2.02.03.01.02.019 1 Unit Pemasangan/Penarikan Kabel Unit Nilai HSPK 15,612.00
Twisted 2 x 10 mm (dibulatkan) :

Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
2.02.03.01.01.005 Pemasangan dan Penarikan Kabel 1.000 m 5,175.00 5,175.00

1.1.7.01.03.08.001.00034 Kabel TC & Twisted Twisted, 2x10 1.000 m' 8,400 8,400.00
Mm
Jumlah Harga Bahan 13,575.00
Peralatan
Jumlah Harga Peralatan
Jumlah 13,575.00
Overhead & Profit 15 % 2,036.25

Nilai HSPK : 15,612.00


2.02.03.01.02.020 1 Unit Pemasangan/Penarikan Kabel Unit Nilai HSPK 34,127.00
Twisted 2 x 16 mm (dibulatkan) :

Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
2.02.03.01.01.005 Pemasangan dan Penarikan Kabel 1.000 m 5,175.00 5,175.00

206
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
1.1.7.01.03.08.001.00035 Kabel TC & Twisted Twisted, 2x16 1.000 m' 24,500 24,500.00
Mm
Jumlah Harga Bahan 29,675.00
Peralatan
Jumlah Harga Peralatan
Jumlah 29,675.00
Overhead & Profit 15 % 4,451.25

Nilai HSPK : 34,127.00


2.02.03.01.02.021 1 m Pemasangan / Penarikan Kabel m' Nilai HSPK 54,827.00
Twisted 4x16 mm (dibulatkan) :

Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
2.02.03.01.01.005 Pemasangan dan Penarikan Kabel 1.000 m 5,175.00 5,175.00

1.1.7.01.03.08.001.00036 Kabel TC & Twisted Twisted, 4x16 1.000 m' 42,500 42,500.00
Mm
Jumlah Harga Bahan 47,675.00
Peralatan
Jumlah Harga Peralatan
Jumlah 47,675.00
Overhead & Profit 15 % 7,151.25

Nilai HSPK : 54,827.00


2.02.03.01.02.022 1 m Memasang Dan Merangkai m' Nilai HSPK 618,010.00
Lampu Hias Neo Neon (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.004 Tukang Listrik 0.010 O.H 110,000 1,100.00
1.10.28.02.01.002.001 Pekerja 0.100 O.H 90,000 9,000.00
Jumlah Harga Tenaga Kerja 10,100.00
Bahan
1.1.7.01.03.08.002.00050 Lampu Hias Neo Neon 1.000 Buah 527,300 527,300.00
Jumlah Harga Bahan 527,300.00
Peralatan
Jumlah Harga Peralatan
Jumlah 537,400.00
Overhead & Profit 15 % 80,610.00

Nilai HSPK : 618,010.00


2.02.03.01.02.023 1 m Memasang Dan Merangkai m' Nilai HSPK 70,955.00
Lampu Hias Circle Light (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.004 Tukang Listrik 0.010 O.H 110,000 1,100.00
1.10.28.02.01.002.001 Pekerja 0.100 O.H 90,000 9,000.00
1.1.7.01.03.08.002.00048 Lampu Circle Light (Twicle Light) 1.000 Roll 51,600 51,600.00
Jumlah Harga Tenaga Kerja 61,700.00
Bahan
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
Jumlah 61,700.00
Overhead & Profit 15 % 9,255.00

Nilai HSPK : 70,955.00


2.02.03.01.03 Pemasangan Tiang PJU
2.02.03.01.03.001 1 Unit Pengecatan Tiang PJU Unit Nilai HSPK 197,980.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.100 OH 130,000 13,000.00
1.10.28.02.01.001.002 Kepala Tukang 0.025 OH 120,000 3,000.00

207
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
1.10.28.02.01.001.005 Tukang Cat 0.250 OH 110,000 27,500.00
1.10.28.02.01.002.001 Pekerja 0.150 OH 90,000 13,500.00
Jumlah Harga Tenaga Kerja 57,000.00
Bahan
1.1.7.01.01.01.006.00005 Cat Besi 0.300 Kg 75,500 22,650.00
1.1.7.01.03.07.001.00011 Sikat Baja 1.000 Buah 14,900 14,900.00
1.1.7.01.01.01.022.00224 Amplas Kasar 0.565 Lembar 5,850 3,306.42
Jumlah Harga Bahan 40,856.42
Peralatan
9.1.2.09.03.01.001.00053 Alat Bantu Penerangan Jalan Umum 1.000 Unit 74,300 74,300.00

Jumlah Harga Peralatan 74,300.00


Jumlah 172,156.42
Overhead & Profit 15 % 25,823.46

Nilai HSPK : 197,980.00


2.02.03.01.03.002 1 Unit Pemasangan Tiang Cabang 1 Unit Nilai HSPK 3,288,885.00
Biasa 5 m (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.130 OH 130,000 16,900.00
1.10.28.02.01.001.004 Tukang Listrik 0.250 OH 110,000 27,500.00
1.10.28.02.01.002.001 Pekerja 0.250 OH 90,000 22,500.00
1.10.28.02.01.002.001 Pekerja 0.750 OH 90,000 67,500.00
Jumlah Harga Tenaga Kerja 134,400.00
Bahan
1.3.2.18.01.01.003.00118 Tiang Cabang biasa 1-5 m 1.000 Unit 1,225,500 1,225,500.00
Jumlah Harga Bahan 1,225,500.00
Peralatan
9.1.2.09.03.01.001.00024 Crane 10-15 Ton 0.500 Jam 3,000,000 1,500,000.00
Jumlah Harga Peralatan 1,500,000.00
Jumlah 2,859,900.00
Overhead & Profit 15 % 428,985.00

Nilai HSPK : 3,288,885.00


2.02.03.01.03.003 1 Unit Pemasangan Tiang Cabang 1 Unit Nilai HSPK 3,789,135.00
Biasa 7 m (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.130 OH 130,000 16,900.00
1.10.28.02.01.001.004 Tukang Listrik 0.250 OH 110,000 27,500.00
1.10.28.02.01.002.001 Pekerja 0.250 OH 90,000 22,500.00
1.10.28.02.01.002.001 Pekerja 0.750 OH 90,000 67,500.00
Jumlah Harga Tenaga Kerja 134,400.00
Bahan
1.3.2.18.01.01.003.00119 Tiang Cabang biasa 1-7 m 1.000 Unit 1,660,500 1,660,500.00
Jumlah Harga Bahan 1,660,500.00
Peralatan
9.1.2.09.03.01.001.00024 Crane 10-15 Ton 0.500 Jam 3,000,000 1,500,000.00
Jumlah Harga Peralatan 1,500,000.00
Jumlah 3,294,900.00
Overhead & Profit 15 % 494,235.00

Nilai HSPK : 3,789,135.00


2.02.03.01.03.004 1 Unit Pemasangan Tiang Cabang 1 Unit Nilai HSPK 4,395,300.00
Biasa 9 m (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.130 OH 130,000 16,900.00
1.10.28.02.01.001.004 Tukang Listrik 0.250 OH 110,000 27,500.00
1.10.28.02.01.002.001 Pekerja 0.250 OH 90,000 22,500.00
1.10.28.02.01.002.001 Pekerja 0.750 OH 90,000 67,500.00
Jumlah Harga Tenaga Kerja 134,400.00
Bahan
1.3.2.18.01.01.003.00120 Tiang Cabang biasa 1-9 m 1.000 Unit 2,187,600 2,187,600.00
Jumlah Harga Bahan 2,187,600.00
Peralatan

208
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
9.1.2.09.03.01.001.00024 Crane 10-15 Ton 0.500 Jam 3,000,000 1,500,000.00
Jumlah Harga Peralatan 1,500,000.00
Jumlah 3,822,000.00
Overhead & Profit 15 % 573,300.00

Nilai HSPK : 4,395,300.00


2.02.03.01.03.005 1 Unit Pemasangan Tiang Cabang 2 Unit Nilai HSPK 3,935,070.00
Biasa 7 m (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.130 OH 130,000 16,900.00
1.10.28.02.01.001.004 Tukang Listrik 0.250 OH 110,000 27,500.00
1.10.28.02.01.002.001 Pekerja 0.250 OH 90,000 22,500.00
1.10.28.02.01.002.001 Pekerja 0.750 OH 90,000 67,500.00
Jumlah Harga Tenaga Kerja 134,400.00
Bahan
1.3.2.18.01.01.003.00121 Tiang Cabang biasa 2-7 m 1.000 Unit 1,787,400 1,787,400.00
Jumlah Harga Bahan 1,787,400.00
Peralatan
9.1.2.09.03.01.001.00024 Crane 10-15 Ton 0.500 Jam 3,000,000 1,500,000.00
Jumlah Harga Peralatan 1,500,000.00
Jumlah 3,421,800.00
Overhead & Profit 15 % 513,270.00

Nilai HSPK : 3,935,070.00


2.02.03.01.03.006 1 unit Pemasangan Tiang Cabang 2 Unit Nilai HSPK 4,788,140.00
Biasa 9 m (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.130 OH 130,000 16,900.00
1.10.28.02.01.001.004 Tukang Listrik 0.250 OH 110,000 27,500.00
1.10.28.02.01.002.001 Pekerja 0.250 OH 90,000 22,500.00
1.10.28.02.01.002.001 Pekerja 0.750 OH 90,000 67,500.00
Jumlah Harga Tenaga Kerja 134,400.00
Bahan
1.3.2.18.01.01.003.00122 Tiang Cabang biasa 2-9 m 1.000 Unit 2,529,200 2,529,200.00
Jumlah Harga Bahan 2,529,200.00
Peralatan
9.1.2.09.03.01.001.00024 Crane 10-15 Ton 0.500 Jam 3,000,000 1,500,000.00
Jumlah Harga Peralatan 1,500,000.00
Jumlah 4,163,600.00
Overhead & Profit 15 % 624,540.00

Nilai HSPK : 4,788,140.00


2.02.03.01.03.007 1 Unit Pemasangan Tiang Cabang 4 Unit Nilai HSPK 5,050,685.00
Biasa 9 m (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.130 OH 130,000 16,900.00
1.10.28.02.01.001.004 Tukang Listrik 0.250 OH 110,000 27,500.00
1.10.28.02.01.002.001 Pekerja 0.250 OH 90,000 22,500.00
1.10.28.02.01.002.001 Pekerja 0.750 OH 90,000 67,500.00
Jumlah Harga Tenaga Kerja 134,400.00
Bahan
1.3.2.18.01.01.003.00123 Tiang Cabang biasa 4-9 m 1.000 Unit 2,757,500 2,757,500.00
Jumlah Harga Bahan 2,757,500.00
Peralatan
9.1.2.09.03.01.001.00024 Crane 10-15 Ton 0.500 Jam 3,000,000 1,500,000.00
Jumlah Harga Peralatan 1,500,000.00
Jumlah 4,391,900.00
Overhead & Profit 15 % 658,785.00

Nilai HSPK : 5,050,685.00


2.02.03.01.03.008 1 m3 Pondasi Biasa PJU untuk 5 m3 Nilai HSPK 1,363,556.00
meter (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.065 OH 130,000 8,450.00

209
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
1.10.28.02.01.001.002 Kepala Tukang 0.030 OH 120,000 3,600.00
1.10.28.02.01.001.006 Tukang Batu 0.125 OH 110,000 13,750.00
1.10.28.02.01.002.001 Pekerja 0.250 OH 90,000 22,500.00
Jumlah Harga Tenaga Kerja 48,300.00
Bahan
1.1.7.01.01.01.008.00077 Angkur Dia. 19 mm Panjang 60 cm 4.000 Buah 83,350 333,400.00

1.1.7.02.02.06.001.00006 Pipa PVC Maspion, AW 2inch. x 4 m 2.000 m 139,600 279,200.00

1.1.7.01.01.01.004.00003 Pasir Urug 0.064 m3 162,550 10,403.20


1.1.7.01.01.05.002.00038 Kayu Meranti, Begesting 0.050 m3 5,224,650 261,232.50
1.1.7.01.01.01.022.00098 Paku Reng 0.500 Kg 21,100 10,550.00
1.1.7.01.01.01.002.00001 Semen Portland 94.376 Kg 1,306 123,269.83
1.1.7.01.01.01.004.00001 Pasir Beton 0.178 m3 232,250 41,433.40
1.1.7.01.01.01.005.00003 Batu Pecah Uk. 2-3 cm 0.041 m3 319,300 12,995.51
1.1.7.01.01.01.005.00002 Batu Pecah Uk. 1-2 cm 0.189 m3 255,450 48,254.51
Jumlah Harga Bahan 1,120,738.94
Peralatan
9.1.2.09.03.01.001.00053 Alat Bantu Penerangan Jalan Umum 0.177 Jam 74,300 13,128.81

9.1.2.09.03.01.001.00021 Vibro Roller 0.008 Jam 168,500 1,297.45


9.1.2.09.03.01.001.00008 Conc. Mixer 0.008 Jam 290,300 2,235.31
Jumlah Harga Peralatan 16,661.57
Jumlah 1,185,700.51
Overhead & Profit 15 % 177,855.08

Nilai HSPK : 1,363,556.00


2.02.03.01.03.009 1 m3 Pondasi Biasa PJU 7 m atau 9 m3 Nilai HSPK 1,374,454.00
m (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.065 OH 130,000 8,450.00
1.10.28.02.01.001.002 Kepala Tukang 0.030 OH 120,000 3,600.00
1.10.28.02.01.001.006 Tukang Batu 0.125 OH 110,000 13,750.00
1.10.28.02.01.002.001 Pekerja 0.125 OH 90,000 11,250.00
Jumlah Harga Tenaga Kerja 37,050.00
Bahan
1.1.7.01.01.01.008.00077 Angkur Dia. 19 mm Panjang 60 cm 4.000 Buah 83,350 333,400.00

1.1.7.02.02.06.001.00040 Pipa PVC Maspion, D 2inch. x 4 m 2.000 m 66,650 133,300.00

1.1.7.01.01.01.004.00003 Pasir Urug 0.096 m3 162,550 15,604.80


1.1.7.01.01.05.002.00038 Kayu Meranti, Begesting 0.050 m3 5,224,650 261,232.50
1.1.7.01.01.01.022.00098 Paku Reng 0.500 Kg 21,100 10,550.00
1.1.7.01.01.01.002.00001 Semen Portland 145.036 Kg 1,306 189,439.71
1.1.7.01.01.01.004.00001 Pasir Beton 0.337 m3 232,250 78,152.13
1.1.7.01.01.01.005.00003 Batu Pecah Uk. 2-3 cm 0.041 m3 319,300 12,995.51
1.1.7.01.01.01.005.00002 Batu Pecah Uk. 1-2 cm 0.377 m3 255,450 96,304.65
Jumlah Harga Bahan 1,130,979.30
Peralatan
9.1.2.09.03.01.001.00053 Alat Bantu Penerangan Jalan Umum 0.271 Jam 74,300 20,127.87

9.1.2.09.03.01.001.00021 Vibro Roller 0.015 Jam 168,500 2,578.05


9.1.2.09.03.01.001.00008 Conc. Mixer 0.015 Jam 290,300 4,441.59
Jumlah Harga Peralatan 27,147.51
Jumlah 1,195,176.81
Overhead & Profit 15 % 179,276.52

Nilai HSPK : 1,374,454.00


2.02.03.01.03.010 1 m3 Pondasi Strous PJU m3 Nilai HSPK 1,889,831.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.067 OH 130,000 8,710.00
1.10.28.02.01.001.002 Kepala Tukang 0.030 OH 120,000 3,600.00
1.10.28.02.01.001.006 Tukang Batu 0.125 OH 110,000 13,750.00

210
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
1.10.28.02.01.002.001 Pekerja 0.500 OH 90,000 45,000.00
Jumlah Harga Tenaga Kerja 71,060.00
Bahan
1.1.7.01.01.01.008.00077 Angkur Dia. 19 mm Panjang 60 cm 4.000 Buah 83,350 333,400.00

1.1.7.02.02.06.001.00040 Pipa PVC Maspion, D 2inch. x 4 m 2.000 m 66,650 133,300.00

1.1.7.01.01.01.004.00003 Pasir Urug 0.096 m3 162,550 15,604.80


1.1.7.01.01.05.002.00038 Kayu Meranti, Begesting 0.050 m3 5,224,650 261,232.50
1.1.7.01.01.01.022.00098 Paku Reng 0.500 Kg 21,100 10,550.00
1.1.7.01.01.01.002.00001 Semen Portland 175.396 Kg 1,306 229,094.63
1.1.7.01.01.01.004.00001 Pasir Beton 0.488 m3 232,250 113,384.45
1.1.7.01.01.01.005.00009 Batu Kerikil Beton 0.086 m3 290,300 25,052.89
1.1.7.01.01.01.012.00005 Besi Beton Dia, 6 mm, 12m 9.540 Batang 29,050 277,137.00
1.1.7.01.01.05.001.00017 Kawat Ikat (Bendrat) Besi Uk. 0,1 cm 0.007 Roll 402,000 2,814.00
x 25 Kg
1.1.7.01.01.01.005.00003 Batu Pecah Uk. 2-3 cm 0.377 m3 319,300 120,376.10
1.1.7.01.01.01.005.00002 Batu Pecah Uk. 1-2 cm 0.041 m3 255,450 10,396.82
Jumlah Harga Bahan 1,532,343.18
Peralatan
9.1.2.09.03.01.001.00053 Alat Bantu Penerangan Jalan Umum 0.271 Jam 74,300 20,127.87

9.1.2.09.03.01.001.00034 Alat Bantu Strouss Pile 1.200 Jam 10,650 12,780.00


9.1.2.09.03.01.001.00021 Vibro Roller 0.015 Jam 168,500 2,578.05
9.1.2.09.03.01.001.00008 Conc. Mixer 0.015 Jam 290,300 4,441.59
Jumlah Harga Peralatan 39,927.51
Jumlah 1,643,330.69
Overhead & Profit 15 % 246,499.60

Nilai HSPK : 1,889,831.00


2.02.03.01.03.011 1 Unit Pemasangan Tiang Oktagonal Unit Nilai HSPK 4,736,850.00
5m Single Hot Dipped Galvanized (dibulatkan) :
dengan Flenders

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.130 OH 130,000 16,900.00
1.10.28.02.01.001.004 Tukang Listrik 0.250 OH 110,000 27,500.00
1.10.28.02.01.002.001 Pekerja 0.250 OH 90,000 22,500.00
1.10.28.02.01.002.001 Pekerja 0.750 OH 90,000 67,500.00
Jumlah Harga Tenaga Kerja 134,400.00
Bahan
1.3.2.18.01.01.003.00074 Tiang Lampu Oktagonal, 5 meter 1.000 Unit 2,484,600 2,484,600.00
Single Ornamen Hot Dipped
Galvanized
Jumlah Harga Bahan 2,484,600.00
Peralatan
9.1.2.09.03.01.001.00024 Crane 10-15 Ton 0.500 Jam 3,000,000 1,500,000.00
Jumlah Harga Peralatan 1,500,000.00
Jumlah 4,119,000.00
Overhead & Profit 15 % 617,850.00

Nilai HSPK : 4,736,850.00


2.02.03.01.03.012 1 Unit Pemasangan Tiang Oktagonal Unit Nilai HSPK 5,624,765.00
5m Double Hot Dipped Galvanized (dibulatkan) :
dengan Flenders

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.130 OH 130,000 16,900.00
1.10.28.02.01.001.004 Tukang Listrik 0.250 OH 110,000 27,500.00
1.10.28.02.01.002.001 Pekerja 0.250 OH 90,000 22,500.00
1.10.28.02.01.002.001 Pekerja 0.750 OH 90,000 67,500.00
Jumlah Harga Tenaga Kerja 134,400.00
Bahan

211
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
1.3.2.18.01.01.003.00075 Tiang Lampu Oktagonal, 5 meter 1.000 Unit 3,256,700 3,256,700.00
Double Ornamen Hot Dipped
Galvanized
Jumlah Harga Bahan 3,256,700.00
Peralatan
9.1.2.09.03.01.001.00024 Crane 10-15 Ton 0.500 Jam 3,000,000 1,500,000.00
Jumlah Harga Peralatan 1,500,000.00
Jumlah 4,891,100.00
Overhead & Profit 15 % 733,665.00

Nilai HSPK : 5,624,765.00


2.02.03.01.03.013 1 Unit Pemasangan Tiang Oktagonal Unit Nilai HSPK 6,028,415.00
7m Single Hot Dipped Galvanized (dibulatkan) :
dengan Flenders

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.130 OH 130,000 16,900.00
1.10.28.02.01.001.004 Tukang Listrik 0.250 OH 110,000 27,500.00
1.10.28.02.01.002.001 Pekerja 0.250 OH 90,000 22,500.00
1.10.28.02.01.002.001 Pekerja 0.750 OH 90,000 67,500.00
Jumlah Harga Tenaga Kerja 134,400.00
Bahan
1.3.2.18.01.01.003.00076 Tiang Lampu Oktagonal, 7 m Single 1.000 Unit 3,607,700 3,607,700.00
Ornamen Hot Dipped Galvanized

Jumlah Harga Bahan 3,607,700.00


Peralatan
9.1.2.09.03.01.001.00024 Crane 10-15 Ton 0.500 Jam 3,000,000 1,500,000.00
Jumlah Harga Peralatan 1,500,000.00
Jumlah 5,242,100.00
Overhead & Profit 15 % 786,315.00

Nilai HSPK : 6,028,415.00


2.02.03.01.03.014 1 Unit Pemasangan Tiang Oktagonal Unit Nilai HSPK 6,990,735.00
7m Double Hot Dipped Galvanized (dibulatkan) :
dengan Flenders

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.130 OH 130,000 16,900.00
1.10.28.02.01.001.004 Tukang Listrik 0.250 OH 110,000 27,500.00
1.10.28.02.01.002.001 Pekerja 0.250 OH 90,000 22,500.00
1.10.28.02.01.002.001 Pekerja 0.750 OH 90,000 67,500.00
Jumlah Harga Tenaga Kerja 134,400.00
Bahan
1.3.2.18.01.01.003.00077 Tiang Lampu Oktagonal, 7 m Double 1.000 Unit 4,444,500 4,444,500.00
Ornamen Hot Dipped Galvanized

Jumlah Harga Bahan 4,444,500.00


Peralatan
9.1.2.09.03.01.001.00024 Crane 10-15 Ton 0.500 Jam 3,000,000 1,500,000.00
Jumlah Harga Peralatan 1,500,000.00
Jumlah 6,078,900.00
Overhead & Profit 15 % 911,835.00

Nilai HSPK : 6,990,735.00


2.02.03.01.03.015 1 Unit Pemasangan Tiang Oktagonal Unit Nilai HSPK 6,990,735.00
9m Single Hot Dipped Galvanized (dibulatkan) :
dengan Flenders

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.130 OH 130,000 16,900.00
1.10.28.02.01.001.004 Tukang Listrik 0.250 OH 110,000 27,500.00
1.10.28.02.01.002.001 Pekerja 0.250 OH 90,000 22,500.00
1.10.28.02.01.002.001 Pekerja 0.750 OH 90,000 67,500.00

212
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Jumlah Harga Tenaga Kerja 134,400.00
Bahan
1.3.2.18.01.01.003.00082 Tiang Lampu Oktagonal, 9 m Single 1.000 Unit 4,444,500 4,444,500.00
Ornamen Hot Dipped Galvanized

Jumlah Harga Bahan 4,444,500.00


Peralatan
9.1.2.09.03.01.001.00024 Crane 10-15 Ton 0.500 Jam 3,000,000 1,500,000.00
Jumlah Harga Peralatan 1,500,000.00
Jumlah 6,078,900.00
Overhead & Profit 15 % 911,835.00

Nilai HSPK : 6,990,735.00


2.02.03.01.03.016 1 Unit Pemasangan Tiang Oktagonal Unit Nilai HSPK 8,224,455.00
9m Double Hot Dipped Galvanized (dibulatkan) :
dengan Flenders

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.130 OH 130,000 16,900.00
1.10.28.02.01.001.004 Tukang Listrik 0.250 OH 110,000 27,500.00
1.10.28.02.01.002.001 Pekerja 0.250 OH 90,000 22,500.00
1.10.28.02.01.002.001 Pekerja 0.750 OH 90,000 67,500.00
Jumlah Harga Tenaga Kerja 134,400.00
Bahan
1.3.2.18.01.01.003.00083 Tiang Lampu Oktagonal, 9 m Double 1.000 Unit 5,517,300 5,517,300.00
Ornamen Hot Dipped Galvanized

Jumlah Harga Bahan 5,517,300.00


Peralatan
9.1.2.09.03.01.001.00024 Crane 10-15 Ton 0.500 Jam 3,000,000 1,500,000.00
Jumlah Harga Peralatan 1,500,000.00
Jumlah 7,151,700.00
Overhead & Profit 15 % 1,072,755.00

Nilai HSPK : 8,224,455.00


2.02.03.01.03.017 1 Unit Pemasangan Tiang Oktagonal Unit Nilai HSPK 10,091,020.00
12m Single Hot Dipped Galvanized (dibulatkan) :
dengan Flenders

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.130 OH 130,000 16,900.00
1.10.28.02.01.001.004 Tukang Listrik 0.250 OH 110,000 27,500.00
1.10.28.02.01.002.001 Pekerja 0.250 OH 90,000 22,500.00
1.10.28.02.01.002.001 Pekerja 0.750 OH 90,000 67,500.00
Jumlah Harga Tenaga Kerja 134,400.00
Bahan
1.3.2.18.01.01.003.00090 Tiang Lampu Oktagonal, 12 m Single 1.000 Unit 7,140,400 7,140,400.00
Ornamen Hot Dipped Galvanized

Jumlah Harga Bahan 7,140,400.00


Peralatan
9.1.2.09.03.01.001.00024 Crane 10-15 Ton 0.500 Jam 3,000,000 1,500,000.00
Jumlah Harga Peralatan 1,500,000.00
Jumlah 8,774,800.00
Overhead & Profit 15 % 1,316,220.00

Nilai HSPK : 10,091,020.00


2.02.03.01.03.018 1 Unit Pemasangan Tiang Oktagonal Unit Nilai HSPK 10,735,825.00
12m Double Hot Dipped Galvanized (dibulatkan) :
dengan Flenders

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.130 OH 130,000 16,900.00
1.10.28.02.01.001.004 Tukang Listrik 0.250 OH 110,000 27,500.00

213
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
1.10.28.02.01.002.001 Pekerja 0.250 OH 90,000 22,500.00
1.10.28.02.01.002.001 Pekerja 0.750 OH 90,000 67,500.00
Jumlah Harga Tenaga Kerja 134,400.00
Bahan
1.3.2.18.01.01.003.00091 Tiang Lampu Oktagonal, 12 m 1.000 Unit 7,701,100 7,701,100.00
Double Ornamen Hot Dipped
Galvanized
Jumlah Harga Bahan 7,701,100.00
Peralatan
9.1.2.09.03.01.001.00024 Crane 10-15 Ton 0.500 Jam 3,000,000 1,500,000.00
Jumlah Harga Peralatan 1,500,000.00
Jumlah 9,335,500.00
Overhead & Profit 15 % 1,400,325.00

Nilai HSPK : 10,735,825.00


2.02.03.01.03.019 1 Unit Pembuatan & Pemasangan Unit Nilai HSPK 4,422,501.00
Tiang Lengkung Galvanish 5 m (dibulatkan) :
Cabang 1, Sistem Flenders

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.500 OH 130,000 65,000.00
1.10.28.02.01.001.013 Tukang Las 0.500 OH 110,000 55,000.00
1.10.28.02.01.001.004 Tukang Listrik 0.500 OH 110,000 55,000.00
1.10.28.02.01.001.005 Tukang Cat 0.250 OH 110,000 27,500.00
1.10.28.02.01.002.001 Pekerja 0.500 OH 90,000 45,000.00
1.10.28.02.01.002.001 Pekerja 2.000 OH 90,000 180,000.00
Jumlah Harga Tenaga Kerja 427,500.00
Bahan
2.02.03.01.01.010 Pembuatan dan Pemasangan 1.000 Unit 383,238.00 383,238.00
Terminal Dalam Tiang
1.1.7.02.02.07.001.00006 Pipa Galvanis Dia, 2inch. @6m 0.333 Batang 638,450 212,859.23
Medium A
1.1.7.02.02.07.001.00008 Pipa Galvanis Dia, 3inch. @6m 0.333 Batang 1,051,900 350,703.46
Medium A
1.1.7.02.02.07.001.00009 Pipa Galvanis Dia, 4inch. @6m 0.333 Batang 1,522,950 507,751.53
Medium A
1.1.7.01.01.01.008.00025 Besi Plat Uk. 30 x 30 cm, Tebal 1,5 13.000 Kg 12,800 166,400.00
cm
Jumlah Harga Bahan 1,620,952.22
Peralatan
9.1.2.09.03.01.001.00024 Crane 10-15 Ton 0.500 Jam 3,000,000 1,500,000.00
9.1.2.09.03.01.001.00053 Alat Bantu Penerangan Jalan Umum 4.000 Jam 74,300 297,200.00

Jumlah Harga Peralatan 1,797,200.00


Jumlah 3,845,652.22
Overhead & Profit 15 % 576,847.83

Nilai HSPK : 4,422,501.00


2.02.03.01.03.020 1 Unit Pembuatan & Pemasangan Unit Nilai HSPK 4,915,816.00
Tiang Lengkung Galvanish 7 m (dibulatkan) :
Cabang 1, Sistem Flenders

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.500 OH 130,000 65,000.00
1.10.28.02.01.001.013 Tukang Las 0.500 OH 110,000 55,000.00
1.10.28.02.01.001.004 Tukang Listrik 0.500 OH 110,000 55,000.00
1.10.28.02.01.001.005 Tukang Cat 0.250 OH 110,000 27,500.00
1.10.28.02.01.002.001 Pekerja 0.500 OH 90,000 45,000.00
1.10.28.02.01.002.001 Pekerja 2.000 OH 90,000 180,000.00
Jumlah Harga Tenaga Kerja 427,500.00
Bahan
2.02.03.01.01.010 Pembuatan dan Pemasangan 1.000 Unit 383,238.00 383,238.00
Terminal Dalam Tiang

214
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
1.1.7.02.02.07.001.00006 Pipa Galvanis Dia, 2inch. @6m 0.333 Batang 638,450 212,859.23
Medium A
1.1.7.02.02.07.001.00008 Pipa Galvanis Dia, 3inch. @6m 0.500 Batang 1,051,900 525,950.00
Medium A
1.1.7.02.02.07.001.00009 Pipa Galvanis Dia, 4inch. @6m 0.500 Batang 1,522,950 761,475.00
Medium A
1.1.7.01.01.01.008.00025 Besi Plat Uk. 30 x 30 cm, Tebal 1,5 13.000 Kg 12,800 166,400.00
cm
Jumlah Harga Bahan 2,049,922.23
Peralatan
9.1.2.09.03.01.001.00024 Crane 10-15 Ton 0.500 Jam 3,000,000 1,500,000.00
9.1.2.09.03.01.001.00053 Alat Bantu Penerangan Jalan Umum 4.000 Jam 74,300 297,200.00

Jumlah Harga Peralatan 1,797,200.00


Jumlah 4,274,622.23
Overhead & Profit 15 % 641,193.33

Nilai HSPK : 4,915,816.00


2.02.03.01.03.021 1 Unit Pembuatan & Pemasangan Unit Nilai HSPK 5,160,531.00
Tiang Lengkung Galvanish 7 m (dibulatkan) :
Cabang 2, Sistem Flenders

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.500 OH 130,000 65,000.00
1.10.28.02.01.001.013 Tukang Las 0.500 OH 110,000 55,000.00
1.10.28.02.01.001.004 Tukang Listrik 0.500 OH 110,000 55,000.00
1.10.28.02.01.001.005 Tukang Cat 0.250 OH 110,000 27,500.00
1.10.28.02.01.002.001 Pekerja 0.500 OH 90,000 45,000.00
1.10.28.02.01.002.001 Pekerja 2.000 OH 90,000 180,000.00
Jumlah Harga Tenaga Kerja 427,500.00
Bahan
2.02.03.01.01.010 Pembuatan dan Pemasangan 1.000 Unit 383,238.00 383,238.00
Terminal Dalam Tiang
1.1.7.02.02.07.001.00006 Pipa Galvanis Dia, 2inch. @6m 0.667 Batang 638,450 425,654.62
Medium A
1.1.7.02.02.07.001.00008 Pipa Galvanis Dia, 3inch. @6m 0.500 Batang 1,051,900 525,950.00
Medium A
1.1.7.02.02.07.001.00009 Pipa Galvanis Dia, 4inch. @6m 0.500 Batang 1,522,950 761,475.00
Medium A
1.1.7.01.01.01.008.00025 Besi Plat Uk. 30 x 30 cm, Tebal 1,5 13.000 Kg 12,800 166,400.00
cm
Jumlah Harga Bahan 2,262,717.62
Peralatan
9.1.2.09.03.01.001.00024 Crane 10-15 Ton 0.500 Jam 3,000,000 1,500,000.00
9.1.2.09.03.01.001.00053 Alat Bantu Penerangan Jalan Umum 4.000 Jam 74,300 297,200.00

Jumlah Harga Peralatan 1,797,200.00


Jumlah 4,487,417.62
Overhead & Profit 15 % 673,112.64

Nilai HSPK : 5,160,531.00


2.02.03.01.03.022 1 Unit Pembuatan & Pemasangan Unit Nilai HSPK 5,892,803.00
Tiang Lengkung Galvanish 9 m (dibulatkan) :
Cabang 1, Sistem Flenders

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.500 OH 130,000 65,000.00
1.10.28.02.01.001.013 Tukang Las 0.500 OH 110,000 55,000.00
1.10.28.02.01.001.004 Tukang Listrik 0.500 OH 110,000 55,000.00
1.10.28.02.01.001.005 Tukang Cat 0.250 OH 110,000 27,500.00
1.10.28.02.01.002.001 Pekerja 0.500 OH 90,000 45,000.00
1.10.28.02.01.002.001 Pekerja 2.000 OH 90,000 180,000.00
Jumlah Harga Tenaga Kerja 427,500.00
Bahan

215
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
2.02.03.01.01.010 Pembuatan dan Pemasangan 1.000 Unit 383,238.00 383,238.00
Terminal Dalam Tiang
1.1.7.02.02.07.001.00006 Pipa Galvanis Dia, 2inch. @6m 0.333 Batang 638,450 212,859.23
Medium A
1.1.7.02.02.07.001.00008 Pipa Galvanis Dia, 3inch. @6m 0.333 Batang 1,051,900 350,703.46
Medium A
1.1.7.02.02.07.001.00009 Pipa Galvanis Dia, 4inch. @6m 0.500 Batang 1,522,950 761,475.00
Medium A
1.1.7.02.02.07.001.00010 Pipa Galvanis Dia, 5inch. @6m 0.500 Batang 2,049,600 1,024,800.00
Medium A
1.1.7.01.01.01.008.00025 Besi Plat Uk. 30 x 30 cm, Tebal 1,5 13.000 Kg 12,800 166,400.00
cm
Jumlah Harga Bahan 2,899,475.69
Peralatan
9.1.2.09.03.01.001.00024 Crane 10-15 Ton 0.500 Jam 3,000,000 1,500,000.00
9.1.2.09.03.01.001.00053 Alat Bantu Penerangan Jalan Umum 4.000 Jam 74,300 297,200.00

Jumlah Harga Peralatan 1,797,200.00


Jumlah 5,124,175.69
Overhead & Profit 15 % 768,626.35

Nilai HSPK : 5,892,803.00


2.02.03.01.03.023 1 Unit Pembuatan & Pemasangan Unit Nilai HSPK 6,516,742.00
Tiang Lengkung Galvanish 9 m (dibulatkan) :
Cabang 2, Sistem Flenders

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.500 OH 130,000 65,000.00
1.10.28.02.01.001.013 Tukang Las 0.750 OH 110,000 82,500.00
1.10.28.02.01.001.004 Tukang Listrik 0.500 OH 110,000 55,000.00
1.10.28.02.01.001.005 Tukang Cat 0.250 OH 110,000 27,500.00
1.10.28.02.01.002.001 Pekerja 0.500 OH 90,000 45,000.00
1.10.28.02.01.002.001 Pekerja 2.000 OH 90,000 180,000.00
Jumlah Harga Tenaga Kerja 455,000.00
Bahan
2.02.03.01.01.010 Pembuatan dan Pemasangan 1.000 Unit 383,238.00 383,238.00
Terminal Dalam Tiang
1.1.7.02.02.07.001.00006 Pipa Galvanis Dia, 2inch. @6m 0.667 Batang 638,450 425,654.62
Medium A
1.1.7.02.02.07.001.00008 Pipa Galvanis Dia, 3inch. @6m 0.500 Batang 1,051,900 525,950.00
Medium A
1.1.7.02.02.07.001.00009 Pipa Galvanis Dia, 4inch. @6m 0.583 Batang 1,522,950 888,489.03
Medium A
1.1.7.02.02.07.001.00010 Pipa Galvanis Dia, 5inch. @6m 0.500 Batang 2,049,600 1,024,800.00
Medium A
1.1.7.01.01.01.008.00025 Besi Plat Uk. 30 x 30 cm, Tebal 1,5 13.000 Kg 12,800 166,400.00
cm
Jumlah Harga Bahan 3,414,531.65
Peralatan
9.1.2.09.03.01.001.00024 Crane 10-15 Ton 0.500 Jam 3,000,000 1,500,000.00
9.1.2.09.03.01.001.00053 Alat Bantu Penerangan Jalan Umum 4.000 Jam 74,300 297,200.00

Jumlah Harga Peralatan 1,797,200.00


Jumlah 5,666,731.65
Overhead & Profit 15 % 850,009.75

Nilai HSPK : 6,516,742.00


2.02.03.01.03.024 1 Unit Pembuatan & Pemasangan Unit Nilai HSPK 7,006,245.00
Tiang Lengkung Galvanish 9 m (dibulatkan) :
Cabang 4, Sistem Flenders

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.500 OH 130,000 65,000.00
1.10.28.02.01.001.013 Tukang Las 0.750 OH 110,000 82,500.00

216
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
1.10.28.02.01.001.004 Tukang Listrik 0.500 OH 110,000 55,000.00
1.10.28.02.01.001.005 Tukang Cat 0.250 OH 110,000 27,500.00
1.10.28.02.01.002.001 Pekerja 0.500 OH 90,000 45,000.00
1.10.28.02.01.002.001 Pekerja 2.000 OH 90,000 180,000.00
Jumlah Harga Tenaga Kerja 455,000.00
Bahan
2.02.03.01.01.010 Pembuatan dan Pemasangan 1.000 Unit 383,238.00 383,238.00
Terminal Dalam Tiang
1.1.7.02.02.07.001.00006 Pipa Galvanis Dia, 2inch. @6m 1.333 Batang 638,450 851,309.23
Medium A
1.1.7.02.02.07.001.00008 Pipa Galvanis Dia, 3inch. @6m 0.500 Batang 1,051,900 525,950.00
Medium A
1.1.7.02.02.07.001.00009 Pipa Galvanis Dia, 4inch. @6m 0.583 Batang 1,522,950 888,489.03
Medium A
1.1.7.02.02.07.001.00010 Pipa Galvanis Dia, 5inch. @6m 0.500 Batang 2,049,600 1,024,800.00
Medium A
1.1.7.01.01.01.008.00025 Besi Plat Uk. 30 x 30 cm, Tebal 1,5 13.000 Kg 12,800 166,400.00
cm
Jumlah Harga Bahan 3,840,186.26
Peralatan
9.1.2.09.03.01.001.00024 Crane 10-15 Ton 0.500 Jam 3,000,000 1,500,000.00
9.1.2.09.03.01.001.00053 Alat Bantu Penerangan Jalan Umum 4.000 Jam 74,300 297,200.00

Jumlah Harga Peralatan 1,797,200.00


Jumlah 6,092,386.26
Overhead & Profit 15 % 913,857.94

Nilai HSPK : 7,006,245.00


2.02.03.01.03.025 1 Unit Pembuatan & Pemasangan Unit Nilai HSPK 8,289,781.00
Tiang Galvanish 9 m Dekoratif (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.500 OH 130,000 65,000.00
1.10.28.02.01.001.013 Tukang Las 0.750 OH 110,000 82,500.00
1.10.28.02.01.001.004 Tukang Listrik 0.500 OH 110,000 55,000.00
1.10.28.02.01.001.005 Tukang Cat 0.250 OH 110,000 27,500.00
1.10.28.02.01.002.001 Pekerja 1.000 OH 90,000 90,000.00
1.10.28.02.01.002.001 Pekerja 2.500 OH 90,000 225,000.00
Jumlah Harga Tenaga Kerja 545,000.00
Bahan
2.02.03.01.01.010 Pembuatan dan Pemasangan 1.000 Unit 383,238.00 383,238.00
Terminal Dalam Tiang
2.02.03.01.01.021 Roll Pipa 2inch. 2.000 Unit 129,911.00 259,822.00
2.02.03.01.01.022 Roll Pipa 3inch. 1.000 Unit 168,820.00 168,820.00
2.02.03.01.01.023 Roll Pipa 4inch. 1.000 Unit 218,845.00 218,845.00
1.1.7.02.02.07.001.00003 Pipa Galvanis Dia, 1inch. @6m 3.000 m' 301,900 905,700.00
Medium A
1.1.7.02.02.07.001.00006 Pipa Galvanis Dia, 2inch. @6m 0.667 Batang 638,450 425,654.62
Medium A
1.1.7.02.02.07.001.00008 Pipa Galvanis Dia, 3inch. @6m 0.500 Batang 1,051,900 525,950.00
Medium A
1.1.7.02.02.07.001.00009 Pipa Galvanis Dia, 4inch. @6m 0.500 Batang 1,522,950 761,475.00
Medium A
1.1.7.02.02.07.001.00010 Pipa Galvanis Dia, 5inch. @6m 0.500 Batang 2,049,600 1,024,800.00
Medium A
1.1.7.01.01.01.008.00025 Besi Plat Uk. 30 x 30 cm, Tebal 1,5 15.000 Kg 12,800 192,000.00
cm
Jumlah Harga Bahan 4,866,304.62
Peralatan
9.1.2.09.03.01.001.00024 Crane 10-15 Ton 0.500 Jam 3,000,000 1,500,000.00
9.1.2.09.03.01.001.00053 Alat Bantu Penerangan Jalan Umum 4.000 Jam 74,300 297,200.00

Jumlah Harga Peralatan 1,797,200.00


Jumlah 7,208,504.62

217
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Overhead & Profit 15 % 1,081,275.69

Nilai HSPK : 8,289,781.00


2.02.03.01.03.026 1 Unit Pemasangan Lampu HPS Unit Nilai HSPK 2,265,270.00
70W/220V Lengkap Armateur, (dibulatkan) :
Balast & Capasitor

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.250 O.H 130,000 32,500.00
1.10.28.02.01.001.004 Tukang Listrik 0.250 O.H 110,000 27,500.00
1.10.28.02.01.002.001 Pekerja 0.750 O.H 90,000 67,500.00
Jumlah Harga Tenaga Kerja 127,500.00
Bahan
1.1.7.01.03.08.002.00021 Lampu Mercury 70 W/220 V Lengkap 1.000 Buah 1,768,000 1,768,000.00
Armateur, Balast & Capasitor

Jumlah Harga Bahan 1,768,000.00


Peralatan
9.1.2.09.03.01.001.00053 Alat Bantu Penerangan Jalan Umum 1.000 Jam 74,300 74,300.00

Jumlah Harga Peralatan 74,300.00


Jumlah 1,969,800.00
Overhead & Profit 15 % 295,470.00

Nilai HSPK : 2,265,270.00


2.02.03.01.03.027 1 Unit Pemasangan Lampu HPS Unit Nilai HSPK 3,222,070.00
150W/220V Lengkap Armateur, (dibulatkan) :
Balast, Ignitor & Capasitor

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.250 O.H 130,000 32,500.00
1.10.28.02.01.001.004 Tukang Listrik 0.250 O.H 110,000 27,500.00
1.10.28.02.01.002.001 Pekerja 0.750 O.H 90,000 67,500.00
Jumlah Harga Tenaga Kerja 127,500.00
Bahan
1.1.7.01.03.08.002.00019 Lampu Mercury 150 W/220 V 1.000 Buah 2,600,000 2,600,000.00
Lengkap Armateur, Balast, Ignitor &
Capasitor
Jumlah Harga Bahan 2,600,000.00
Peralatan
9.1.2.09.03.01.001.00053 Alat Bantu Penerangan Jalan Umum 1.000 Jam 74,300 74,300.00

Jumlah Harga Peralatan 74,300.00


Jumlah 2,801,800.00
Overhead & Profit 15 % 420,270.00

Nilai HSPK : 3,222,070.00


2.02.03.01.03.028 1 Unit Pemasangan Lampu HPS Unit Nilai HSPK 6,404,580.00
250W/220V Lengkap Armateur, (dibulatkan) :
Balast, Ignitor & Capasitor

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.250 O.H 130,000 32,500.00
1.10.28.02.01.001.004 Tukang Listrik 0.250 O.H 110,000 27,500.00
1.10.28.02.01.002.001 Pekerja 0.750 O.H 90,000 67,500.00
Jumlah Harga Tenaga Kerja 127,500.00
Bahan
1.1.7.01.03.08.002.00020 Lampu Mercury 250W/220V Lengkap 1.000 Buah 5,367,400 5,367,400.00
Armatur Ballast & Capasitor 32uf

Jumlah Harga Bahan 5,367,400.00


Peralatan
9.1.2.09.03.01.001.00053 Alat Bantu Penerangan Jalan Umum 1.000 Jam 74,300 74,300.00

218
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Jumlah Harga Peralatan 74,300.00
Jumlah 5,569,200.00
Overhead & Profit 15 % 835,380.00

Nilai HSPK : 6,404,580.00


2.02.03.01.03.029 1 Unit Pemasangan Lampu HPS Unit Nilai HSPK 6,404,580.00
400W/220V Lengkap Armateur, (dibulatkan) :
Balast, Ignitor & Capasitor

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.250 O.H 130,000 32,500.00
1.10.28.02.01.001.004 Tukang Listrik 0.250 O.H 110,000 27,500.00
1.10.28.02.01.002.001 Pekerja 0.750 O.H 90,000 67,500.00
Jumlah Harga Tenaga Kerja 127,500.00
Bahan
1.1.7.01.03.08.002.00020 Lampu HPS 400 W/220 V Lengkap 1.000 Buah 5,367,400 5,367,400.00
Armateur, Balast, Ignitor & Capasitor

Jumlah Harga Bahan 5,367,400.00


Peralatan
9.1.2.09.03.01.001.00053 Alat Bantu Penerangan Jalan Umum 1.000 Jam 74,300 74,300.00

Jumlah Harga Peralatan 74,300.00


Jumlah 5,569,200.00
Overhead & Profit 15 % 835,380.00

Nilai HSPK : 6,404,580.00


2.02.03.01.03.030 1 Unit Pemasangan Lampu Sorot 80 Unit Nilai HSPK 4,465,450.00
W Lengkap Armateur, Ignitor, (dibulatkan) :
Capasitor
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.250 O.H 130,000 32,500.00
1.10.28.02.01.001.004 Tukang Listrik 0.250 O.H 110,000 27,500.00
1.10.28.02.01.002.001 Pekerja 0.750 O.H 90,000 67,500.00
Jumlah Harga Tenaga Kerja 127,500.00
Bahan
1.1.7.01.03.08.002.00018 Lampu HPP 133 CONFORT 80 W / 1.000 Buah 3,681,200 3,681,200.00
220 V
Jumlah Harga Bahan 3,681,200.00
Peralatan
9.1.2.09.03.01.001.00053 Alat Bantu Penerangan Jalan Umum 1.000 Jam 74,300 74,300.00

Jumlah Harga Peralatan 74,300.00


Jumlah 3,883,000.00
Overhead & Profit 15 % 582,450.00

Nilai HSPK : 4,465,450.00


2.02.03.01.03.031 1 Unit Pemasangan Lampu Sorot 150 Unit Nilai HSPK 2,772,995.00
W Lengkap Armateur, Ignitor, (dibulatkan) :
Capasitor
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.250 O.H 130,000 32,500.00
1.10.28.02.01.001.004 Tukang Listrik 0.250 O.H 110,000 27,500.00
1.10.28.02.01.002.001 Pekerja 0.750 O.H 90,000 67,500.00
Jumlah Harga Tenaga Kerja 127,500.00
Bahan
1.1.7.01.03.08.002.00031 Lampu MNF 100 / HPIT 150 W 1.000 Buah 2,209,500 2,209,500.00
Jumlah Harga Bahan 2,209,500.00
Peralatan
9.1.2.09.03.01.001.00053 Alat Bantu Penerangan Jalan Umum 1.000 Jam 74,300 74,300.00

Jumlah Harga Peralatan 74,300.00


Jumlah 2,411,300.00
Overhead & Profit 15 % 361,695.00

219
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f

Nilai HSPK : 2,772,995.00


2.02.03.01.03.032 1 Unit Pemasangan Lampu Sorot 250 Unit Nilai HSPK 2,772,995.00
W Lengkap Armateur, Ignitor, (dibulatkan) :
Capasitor
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.250 O.H 130,000 32,500.00
1.10.28.02.01.001.004 Tukang Listrik 0.250 O.H 110,000 27,500.00
1.10.28.02.01.002.001 Pekerja 0.750 O.H 90,000 67,500.00
Jumlah Harga Tenaga Kerja 127,500.00
Bahan
1.1.7.01.03.08.002.00032 Lampu MNF 100 / HPIT 250 W 1.000 Buah 2,209,500 2,209,500.00
Jumlah Harga Bahan 2,209,500.00
Peralatan
9.1.2.09.03.01.001.00053 Alat Bantu Penerangan Jalan Umum 1.000 Jam 74,300 74,300.00

Jumlah Harga Peralatan 74,300.00


Jumlah 2,411,300.00
Overhead & Profit 15 % 361,695.00

Nilai HSPK : 2,772,995.00


2.02.03.01.03.033 1 Unit Pemasangan Lampu Mercury Unit Nilai HSPK 501,400.00
HPLN 80 W (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.250 O.H 130,000 32,500.00
1.10.28.02.01.001.004 Tukang Listrik 0.250 O.H 110,000 27,500.00
1.10.28.02.01.002.001 Pekerja 0.750 O.H 90,000 67,500.00
Jumlah Harga Tenaga Kerja 127,500.00
Bahan
1.1.7.01.03.08.002.00024 Bola Lampu Mercury HPLN 80 1.000 Buah 40,650 40,650.00
Watt/220 V
1.1.7.01.03.08.006.00001 Ballast BHL 80 watt 1.000 Buah 148,900 148,900.00
1.1.7.01.03.08.012.00005 Kap Lampu Hijau, Full E-40 1.000 Buah 44,650 44,650.00
Jumlah Harga Bahan 234,200.00
Peralatan
9.1.2.09.03.01.001.00053 Alat Bantu Penerangan Jalan Umum 1.000 Jam 74,300 74,300.00

Jumlah Harga Peralatan 74,300.00


Jumlah 436,000.00
Overhead & Profit 15 % 65,400.00

Nilai HSPK : 501,400.00


2.02.03.01.03.034 1 Unit Pemasangan Lampu Mercury Unit Nilai HSPK 550,505.00
HPLN 125 watt/220 V (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.250 O.H 130,000 32,500.00
1.10.28.02.01.001.004 Tukang Listrik 0.250 O.H 110,000 27,500.00
1.10.28.02.01.002.001 Pekerja 0.750 O.H 90,000 67,500.00
Jumlah Harga Tenaga Kerja 127,500.00
Bahan
1.1.7.01.03.08.002.00022 Bola Lampu HPLN 125 Watt/220 V 1.000 Buah 52,250 52,250.00

1.1.7.01.03.08.006.00002 Ballast BHL 125 watt 1.000 Buah 180,000 180,000.00


1.1.7.01.03.08.012.00005 Kap Lampu Hijau, Full E-40 1.000 Buah 44,650 44,650.00
Jumlah Harga Bahan 276,900.00
Peralatan
9.1.2.09.03.01.001.00053 Alat Bantu Penerangan Jalan Umum 1.000 Jam 74,300 74,300.00

Jumlah Harga Peralatan 74,300.00


Jumlah 478,700.00
Overhead & Profit 15 % 71,805.00

Nilai HSPK : 550,505.00

220
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
2.02.03.01.03.035 1 Unit Pemasangan Lampu Mercury Unit Nilai HSPK 722,258.00
HPLN 250w/220v Dengan Ballast (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.250 O.H 130,000 32,500.00
1.10.28.02.01.001.004 Tukang Listrik 0.250 O.H 110,000 27,500.00
1.10.28.02.01.002.001 Pekerja 0.750 O.H 90,000 67,500.00
Jumlah Harga Tenaga Kerja 127,500.00
Bahan
1.1.7.01.03.08.002.00023 Lampu HPLN 250w/220v 1.000 Buah 87,100 87,100.00
1.1.7.01.03.08.006.00003 Ballast BHL 250 watt 1.000 Buah 294,500 294,500.00
1.1.7.01.03.08.012.00005 Kap Lampu Hijau, Full E-40 1.000 Buah 44,650 44,650.00
Jumlah Harga Bahan 426,250.00
Peralatan
9.1.2.09.03.01.001.00053 Alat Bantu Penerangan Jalan Umum 1.000 Jam 74,300 74,300.00

Jumlah Harga Peralatan 74,300.00


Jumlah 628,050.00
Overhead & Profit 15 % 94,207.50

Nilai HSPK : 722,258.00


2.02.03.01.03.036 1 Unit Pemasangan Lampu Sorot Unit Nilai HSPK 3,335,345.00
HPIT MNF-300 250 W/220 V (dibulatkan) :
Lengkap Armateur, Ignitor, Capasitor

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.250 O.H 130,000 32,500.00
1.10.28.02.01.001.004 Tukang Listrik 0.250 O.H 110,000 27,500.00
1.10.28.02.01.002.001 Pekerja 0.750 O.H 90,000 67,500.00
Jumlah Harga Tenaga Kerja 127,500.00
Bahan
1.1.7.01.03.08.002.00032 Lampu HPIT MNF-300, 250 W / 220 1.000 Buah 2,209,500 2,209,500.00
V
1.1.7.01.03.08.006.00003 Ballast BHL 250 watt 1.000 Buah 294,500 294,500.00
1.3.2.18.01.01.003.00197 Armatur Box Lampu Warning Light 1.000 Buah 120,200 120,200.00

Jumlah Harga Bahan 2,624,200.00


Peralatan
9.1.2.09.03.01.001.00053 Alat Bantu Penerangan Jalan Umum 2.000 Jam 74,300 148,600.00

Jumlah Harga Peralatan 148,600.00


Jumlah 2,900,300.00
Overhead & Profit 15 % 435,045.00

Nilai HSPK : 3,335,345.00


2.02.03.01.03.037 1 Unit Pemasangan Lampu SL 23 W Unit Nilai HSPK 291,180.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.250 O.H 130,000 32,500.00
1.10.28.02.01.001.004 Tukang Listrik 0.250 O.H 110,000 27,500.00
1.10.28.02.01.002.001 Pekerja 0.750 O.H 90,000 67,500.00
Jumlah Harga Tenaga Kerja 127,500.00
Bahan
1.1.7.01.03.08.002.00012 Lampu Essential Philips, 23 Watt 1.000 Buah 51,400 51,400.00
Jumlah Harga Bahan 51,400.00
Peralatan
9.1.2.09.03.01.001.00053 Alat Bantu Penerangan Jalan Umum 1.000 Jam 74,300 74,300.00

Jumlah Harga Peralatan 74,300.00


Jumlah 253,200.00
Overhead & Profit 15 % 37,980.00

Nilai HSPK : 291,180.00

221
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
2.02.03.01.03.038 1 Unit Pemasangan Lampu SL 18 Unit Nilai HSPK 282,900.00
Watt (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.250 O.H 130,000 32,500.00
1.10.28.02.01.001.004 Tukang Listrik 0.250 O.H 110,000 27,500.00
1.10.28.02.01.002.001 Pekerja 0.750 O.H 90,000 67,500.00
Jumlah Harga Tenaga Kerja 127,500.00
Bahan
1.1.7.01.03.08.002.00011 Lampu Essential Philips, 18 Watt 1.000 Buah 44,200 44,200.00
Jumlah Harga Bahan 44,200.00
Peralatan
9.1.2.09.03.01.001.00053 Alat Bantu Penerangan Jalan Umum 1.000 Jam 74,300 74,300.00

Jumlah Harga Peralatan 74,300.00


Jumlah 246,000.00
Overhead & Profit 15 % 36,900.00

Nilai HSPK : 282,900.00


2.02.03.02 K. SARANA LALU LINTAS
2.02.03.02.01 Rambu - Rambu Lalu Lintas
2.02.03.02.01.001 1 m3 Pekerjaan Bekisting Pondasi m3 Nilai HSPK 82,735.00
Rambu Lalu Lintas (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.003 O.H 130,000 429.00
1.10.28.02.01.001.002 Kepala Tukang 0.017 O.H 120,000 2,004.00
1.10.28.02.01.001.004 Tukang Kayu 0.167 O.H 110,000 18,337.00
1.10.28.02.01.002.001 Pekerja 0.067 O.H 90,000 6,003.00
Jumlah Harga Tenaga Kerja 26,773.00
Bahan
1.1.7.01.01.01.022.00104 Paku Biasa, Uk. 2inch. - 5inch. 0.300 Kg 19,550 5,865.00
1.1.7.01.01.05.002.00038 Kayu Bengkirai, Papan 0.007 m3 5,224,650 35,005.16
1.1.7.01.01.04.002.00001 Minyak Pelumas 0.100 Liter 43,000 4,300.00
Jumlah Harga Bahan 45,170.16
Peralatan
Jumlah Harga Peralatan
Jumlah 71,943.16
Overhead & Profit 15 % 10,791.47

Nilai HSPK : 82,735.00


2.02.03.02.01.002 1 Unit Pekerjaan Pemotongan dan Unit Nilai HSPK 10,416.00
Pengeboran untuk Rambu-Rambu (dibulatkan) :
Lalu Lintas

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.001 O.H 130,000 182.00
1.10.28.02.01.001.002 Kepala Tukang 0.023 O.H 120,000 2,700.00
1.10.28.02.01.002.001 Pekerja 0.068 O.H 90,000 6,075.00
Jumlah Harga Tenaga Kerja 8,957.00
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.09.03.01.001.00062 Gergaji Besi 0.001 buah 39,150 39.15
1.3.2.03.02.07.009.00039 Mata Bor Besi Bosch, HSS-G - 10.0 0.001 buah 60,400 60.40
mm
Jumlah Harga Peralatan 99.55
Jumlah 9,056.55
Overhead & Profit 15 % 1,358.48

Nilai HSPK : 10,416.00


2.02.03.02.01.003 1 Unit Pekerjaan Perakitan dan Unit Nilai HSPK 54,913.00
Penyetelan untuk Rambu-Rambu (dibulatkan) :
Lalu Lintas
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.075 O.H 130,000 9,750.00

222
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
1.10.28.02.01.002.001 Pekerja 0.375 O.H 90,000 33,750.00
Jumlah Harga Tenaga Kerja 43,500.00
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.09.03.01.001.00094 Alat Bantu Penyetelan 0.250 Ls 8,500 2,125.00
Jumlah Harga Peralatan 2,125.00
Jumlah 47,750.00
Overhead & Profit 15 % 7,162.50

Nilai HSPK : 54,913.00


2.02.03.02.01.004 1 Unit pengadaan angkur untuk Unit Nilai HSPK 726,045.00
dudukan box control (dibulatkan) :
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
2.01.01.03.01.005 Beton Cor 0.380 m3 1,295,114.00 492,143.32
1.1.7.01.01.01.008.00079 Angkur Dia. 25 mm 4.000 Buah 34,800 139,200.00
Jumlah Harga Bahan 631,343.32
Peralatan
Jumlah Harga Peralatan
Jumlah 631,343.32
Overhead & Profit 15 % 94,701.50

Nilai HSPK : 726,045.00


2.02.03.02.01.005 1 Unit Ongkos Angkut ke Lokasi Unit Nilai HSPK 20,294.00
(Rambu, Delineator, RPPJ) (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.016 Sopir 0.010 O.H 110,000 1,045.00
1.10.28.02.01.002.001 Pekerja 0.038 O.H 90,000 3,429.00
Jumlah Harga Tenaga Kerja 4,474.00
Bahan
1.1.7.01.01.04.001.00006 Solar Industri 0.667 Liter 14,450 9,633.82
Jumlah Harga Bahan 9,633.82
Peralatan
9.1.2.08.01.01.001.00012 Sewa Kendaraan 0.010 Unit/Hari 372,450 3,538.28
Jumlah Harga Peralatan 3,538.28
Jumlah 17,646.09
Overhead & Profit 15 % 2,646.91

Nilai HSPK : 20,294.00


2.02.03.02.01.006 1 Unit Ongkos Angkut ke Lokasi Unit Nilai HSPK 71,114.00
(Pagar Pengaman Jalan) (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.016 Sopir 0.033 O.H 110,000 3,674.00
1.10.28.02.01.002.001 Pekerja 0.133 O.H 90,000 12,006.00
Jumlah Harga Tenaga Kerja 15,680.00
Bahan
1.1.7.01.01.04.001.00006 Solar Industri 2.333 Liter 14,450 33,717.63
9.1.2.08.01.01.001.00012 Sewa Kendaraan 0.033 Unit/Hari 372,450 12,439.83
Jumlah Harga Bahan 46,157.46
Peralatan
Jumlah Harga Peralatan
Jumlah 61,837.46
Overhead & Profit 15 % 9,275.62

Nilai HSPK : 71,114.00


2.02.03.02.01.007 1 Unit Ongkos Angkut ke Lokasi Unit Nilai HSPK 1,657,868.00
(Warning Light, Alat Pemberi Isyarat (dibulatkan) :
Lalu Lintas, Marka)

Tenaga Kerja

223
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
1.10.28.02.01.001.016 Sopir 0.778 O.H 110,000 85,536.00
1.10.28.02.01.002.001 Pekerja 3.110 O.H 90,000 279,936.00
Jumlah Harga Tenaga Kerja 365,472.00
Bahan
1.1.7.01.01.04.001.00006 Solar Industri 54.432 Liter 14,450 786,535.18
Jumlah Harga Bahan 786,535.18
Peralatan
9.1.2.08.01.01.001.00012 Sewa Kendaraan 0.778 Unit/Hari 372,450 289,617.12
Jumlah Harga Peralatan 289,617.12
Jumlah 1,441,624.30
Overhead & Profit 15 % 216,243.64

Nilai HSPK : 1,657,868.00


2.02.03.02.01.008 1 Unit Ongkos Angkut ke Lokasi Unit Nilai HSPK 3,576.00
(Paku Jalan) (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.016 Sopir 0.002 O.H 110,000 187.00
1.10.28.02.01.002.001 Pekerja 0.007 O.H 90,000 603.00
Jumlah Harga Tenaga Kerja 790.00
Bahan
1.1.7.01.01.04.001.00006 Solar Industri 0.117 Liter 14,450 1,686.32
Jumlah Harga Bahan 1,686.32
Peralatan
9.1.2.08.01.01.001.00012 Sewa Kendaraan 0.002 Unit/Hari 372,450 633.17
Jumlah Harga Peralatan 633.17
Jumlah 3,109.48
Overhead & Profit 15 % 466.42

Nilai HSPK : 3,576.00


2.02.03.02.01.009 1 unit Pekerjaan Pengeboran dan m' Nilai HSPK 41,400.00
Pemasangan Paku Jalan (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.400 O.H 90,000 36,000.00
Jumlah Harga Tenaga Kerja 36,000.00
Bahan
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
Jumlah 36,000.00
Overhead & Profit 15 % 5,400.00

Nilai HSPK : 41,400.00


2.02.03.02.01.010 1 unit Pekerjaan Pengeboran dan Unit Nilai HSPK 57,960.00
Pemasangan Paku Jalan Bulat (dibulatkan) :
(Tempered)
Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.560 O.H 90,000 50,400.00
Jumlah Harga Tenaga Kerja 50,400.00
Bahan
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
Jumlah 50,400.00
Overhead & Profit 15 % 7,560.00

Nilai HSPK : 57,960.00


2.02.03.02.01.011 1 m' Penggelaran Kabel m' Nilai HSPK 5,785.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.010 O.H 130,000 1,300.00
1.10.28.02.01.002.001 Pekerja 0.032 O.H 90,000 2,880.00
Jumlah Harga Tenaga Kerja 4,180.00
Bahan
Jumlah Harga Bahan

224
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Peralatan
9.1.2.09.03.01.001.00094 Alat Bantu Penyetelan 0.100 Ls 8,500 850.00
Jumlah Harga Peralatan 850.00
Jumlah 5,030.00
Overhead & Profit 15 % 754.50

Nilai HSPK : 5,785.00


2.02.03.02.01.012 1 m Pemasangan Pipa PVC untuk m' Nilai HSPK 4,373.00
Alat Pemberi Isyarat Lalu Lintas (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.005 O.H 130,000 650.00
1.10.28.02.01.002.001 Pekerja 0.027 O.H 90,000 2,430.00
Jumlah Harga Tenaga Kerja 3,080.00
Bahan
Jumlah Harga Bahan
Peralatan
9.1.2.09.03.01.001.00094 Alat Bantu Penyetelan 0.085 Ls 8,500 722.50
Jumlah Harga Peralatan 722.50
Jumlah 3,802.50
Overhead & Profit 15 % 570.38

Nilai HSPK : 4,373.00


2.02.03.02.01.013 1 m2 Gali dan tutup aspal m2 Nilai HSPK 199,633.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.433 O.H 90,000 38,997.00
Jumlah Harga Tenaga Kerja 38,997.00
Bahan
1.1.7.01.01.01.001.00003 Aspal Panas AC 60/70 2.500 Kg 11,100 27,750.00
1.1.7.01.01.01.005.00001 Batu Pecah Uk. 0,5-1 cm 0.012 m3 232,250 2,787.00
1.1.7.01.01.04.001.00006 Solar Industri 0.500 Liter 14,450 7,225.00
Jumlah Harga Bahan 37,762.00
Peralatan
9.1.2.09.03.01.001.00094 Alat Bantu Penyetelan 1.000 Ls 8,500 8,500.00
9.1.2.09.03.01.001.00040 Jack Hammer 1.167 Jam 37,300 43,525.37
9.1.2.09.03.01.001.00018 Stamper 1.167 Jam 38,400 44,808.96
Jumlah Harga Peralatan 96,834.33
Jumlah 173,593.33
Overhead & Profit 15 % 26,039.00

Nilai HSPK : 199,633.00


2.02.03.02.01.014 1 m2 Pekerjaan Cat Besi m2 Nilai HSPK 130,086.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.005 Tukang Cat 0.340 O.H 110,000 37,400.00
1.10.28.02.01.002.001 Pekerja 0.200 O.H 90,000 18,000.00
Jumlah Harga Tenaga Kerja 55,400.00
Bahan
1.1.7.01.01.01.006.00005 Cat Besi 0.425 Kg 75,500 32,087.50
1.1.7.01.01.01.006.00006 Cat Meni Besi 0.125 Kg 37,200 4,650.00
1.1.7.01.01.01.006.00044 Minyak Cat Biasa 0.750 Liter 24,300 18,225.00
1.1.7.01.01.01.022.00249 Kuas Cat 4inch. 0.100 Buah 17,050 1,705.00
1.1.7.01.01.01.022.00225 Amplas Halus 0.200 Lembar 5,250 1,050.00
Jumlah Harga Bahan 57,717.50
Peralatan
Jumlah Harga Peralatan
Jumlah 113,117.50
Overhead & Profit 15 % 16,967.63

Nilai HSPK : 130,086.00


2.02.03.02.01.015 1 Unit Pekerjaan Pengecatan Tiang Unit Nilai HSPK 51,448.00
dan Patok Pengaman (dibulatkan) :
Tenaga Kerja

225
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Jumlah Harga Tenaga Kerja
Bahan
2.02.03.02.01.014 Pekerjaan Cat Besi 0.344 m2 130,086.00 44,736.58
Jumlah Harga Bahan 44,736.58
Peralatan
Jumlah Harga Peralatan
Jumlah 44,736.58
Overhead & Profit 15 % 6,710.49

Nilai HSPK : 51,448.00


2.02.03.02.01.016 1 m' Ongkos Pekerjaan Pengecatan m' Nilai HSPK 10,609.00
Zebra Cross / Marka Jalan (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.103 O.H 90,000 9,225.00
Jumlah Harga Tenaga Kerja 9,225.00
Bahan
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
Jumlah 9,225.00
Overhead & Profit 15 % 1,383.75

Nilai HSPK : 10,609.00


2.02.03.02.01.017 1 m' Pengadaan dan Pemasangan m' Nilai HSPK 57,465.00
Marka Jalan ukuran 3 x 120 mm (dibulatkan) :
(Thermoplastic)

Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
1.3.2.18.01.01.003.00176 Thermoplastic (marka) 0.900 Kg 40,700 36,630.00
1.3.2.18.01.01.003.00175 Glass Beads (marka) 0.100 Kg 27,300 2,730.00
2.02.03.02.01.016 Ongkos Pengecatan 1.000 m' 10,609.00 10,609.00
Jumlah Harga Bahan 49,969.00
Peralatan
Jumlah Harga Peralatan
Jumlah 49,969.00
Overhead & Profit 15 % 7,495.35

Nilai HSPK : 57,465.00


2.02.03.02.01.018 1 m' Pengadaan dan Pemasangan m' Nilai HSPK 53,221.00
Marka Jalan ukuran 3 x 120 mm (dibulatkan) :
(Coldplastic)

Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
1.3.2.18.01.01.003.00174 Cold Plastic (marka) 0.900 Kg 36,600 32,940.00
1.3.2.18.01.01.003.00175 Glass Beads (marka) 0.100 Kg 27,300 2,730.00
2.02.03.02.01.016 Ongkos Pengecatan 1.000 m2 10,609.00 10,609.00
Jumlah Harga Tenaga Kerja 46,279.00
Bahan
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
Jumlah 46,279.00
Overhead & Profit 15 % 6,941.85

Nilai HSPK : 53,221.00


2.02.03.02.01.019 1 m' Pengadaan dan Pemasangan m' Nilai HSPK 39,736.00
Marka Jalan ukuran 2 x 120 mm (dibulatkan) :
(Thermoplastic)

226
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
1.3.2.18.01.01.003.00176 Thermoplastic (marka) 0.540 Kg 40,700 21,978.00
1.3.2.18.01.01.003.00175 Glass Beads (marka) 0.072 Kg 27,300 1,965.60
2.02.03.02.01.016 Ongkos Pengecatan 1.000 m' 10,609.00 10,609.00
Jumlah Harga Bahan 34,552.60
Peralatan
Jumlah Harga Peralatan
Jumlah 34,552.60
Overhead & Profit 15 % 5,182.89

Nilai HSPK : 39,736.00


2.02.03.02.01.020 1 m' Pengadaan dan Pemasangan m' Nilai HSPK 37,190.00
Marka Jalan ukuran 2 x 120 mm (dibulatkan) :
(Coldplastic)

Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
1.3.2.18.01.01.003.00174 Cold Plastic (marka) 0.540 Kg 36,600 19,764.00
1.3.2.18.01.01.003.00175 Glass Beads (marka) 0.072 Kg 27,300 1,965.60
2.02.03.02.01.016 Ongkos Pengecatan 1.000 m2 10,609.00 10,609.00
Jumlah Harga Bahan 32,338.60
Peralatan
Jumlah Harga Peralatan
Jumlah 32,338.60
Overhead & Profit 15 % 4,850.79

Nilai HSPK : 37,190.00


2.02.03.02.01.021 1 Unit Pengadaan dan Pemasangan Unit Nilai HSPK 86,416,506.00
Warning Light (Lampu Peringatan) (dibulatkan) :

Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
1.1.7.02.02.06.001.00069 Pipa PVC Maspion, C 5/8inch. x 4 cm 40.000 Batang 8,700 348,000.00

1.3.2.18.01.01.003.00197 Armatur Box Lampu Warning Light 8.000 Buah 120,200 961,600.00

1.3.2.18.01.01.003.00202 Kontrol WL dengan Konfigurasi 1.000 Buah 4,067,200 4,067,200.00


(Double Flasher)
1.1.7.01.03.08.001.00018 Kabel NYY Supreme, 4 x 2,5 mm 300.000 m' 28,750 8,625,000.00
1.3.2.18.01.01.003.00159 Set Terminal Kabel 3.000 Buah 20,900 62,700.00
1.3.2.18.01.01.003.00160 Terminal Kabel 3.000 Buah 24,100 72,300.00
1.3.2.18.01.01.001.00001 Lampu Traffic Light (Box Lamp) 3 4.000 Buah 6,095,400 24,381,600.00
aspek 30 Cm LED (Super Bright)
1.3.2.18.01.01.003.00210 Pasang dan Set Box lampu 22.000 Buah 61,500 1,353,000.00
1.3.2.18.01.01.003.00188 Delineator (Patok Pengaman) 3.000 Buah 362,300 1,086,900.00
1.3.2.18.01.01.003.00130 Tiang Overhead/Lengkung 2.000 Buah 5,224,700 10,449,400.00
2.02.03.02.01.011 Penggelaran kabel 460.000 m' 5,785.00 2,661,100.00
2.02.03.02.01.012 Penanaman Pipa Pelindung 160.000 m' 4,373.00 699,680.00
2.02.03.02.01.013 Gali dan Tutup Aspal 2.500 m3 199,633.00 499,082.50
2.01.01.01.02.004 Gali dan Tutup Tanah Keras 100.000 m3 108,284.00 10,828,400.00
2.01.01.03.01.005 Pengecoran Tiang Lengkung (4 buah) 1.870 m3 1,295,114.00 2,421,863.18

2.01.01.03.01.005 Pengecoran Patok Pengaman (3 0.310 m3 1,295,114.00 401,485.34


buah)
2.02.03.02.01.004 Pengadaan angkur untuk dudukan 1.000 Buah 726,045.00 726,045.00
box control
2.01.01.03.01.005 Beton setara K-175 0.380 m3 1,295,114.00 492,143.32
2.02.03.02.01.015 Pengecatan Tiang dan Patok 15.000 Buah 51,448.00 771,720.00
Pengaman
1.10.28.03.02.001.003 Biaya Penyambungan PLN 1.000 Unit 2,577,700 2,577,700.00

227
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
2.02.03.02.01.007 Ongkos Angkut Lampu Peringatan ke 1.000 set 1,657,868.00 1,657,868.00
Lokasi
Jumlah Harga Bahan 75,144,787.34
Peralatan
Jumlah Harga Peralatan
Jumlah 75,144,787.34
Overhead & Profit 15 % 11,271,718.10

Nilai HSPK : 86,416,506.00


2.02.03.02.01.022 Pengadaan dan Pemasangan Lampu Unit Nilai HSPK 28,400,803.00
Peringatan Tenaga Surya (Warning (dibulatkan) :
Light Solar Cell) Tiang Lengkung

Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
1.3.2.18.01.01.003.00198 Battery Jenis VRLA Deep Cycle PV 1.000 pcs 2,113,000 2,113,000.00
Kapasitas 50 Ah 12 V
1.3.2.18.01.01.001.00002 Lampu Traffic Light (Box Lamp) 2 2.000 Unit 3,599,200 7,198,400.00
aspek 30 Cm LED (Super Bright)
1.3.2.18.01.01.003.00227 Controller Solar Cell 50 WP 1.000 Unit 1,277,200.00 1,277,200.00
1.3.2.18.01.01.003.00226 Solar Cell 50 Watt 12 Volt 1.000 Unit 1,039,200.00 1,039,200.00
1.3.2.18.01.01.003.00188 Delineator (Patok Pengaman) 3.000 pcs 362,300 1,086,900.00
1.3.2.18.01.01.003.00130 Tiang Overhead/Lengkung 1.000 Unit 5,224,700 5,224,700.00
2.01.01.01.02.004 Galian Tanah 2.400 m3 108,284.00 259,881.60
2.01.01.03.01.005 Pengecoran 0.600 m3 1,295,114.00 777,068.40
1.3.2.18.01.01.003.00229 Pemasangan dan Akomodasi 1.000 Ls 5,720,000.00 5,720,000.00
Jumlah Harga Bahan 24,696,350.00
Peralatan
Jumlah Harga Peralatan
Jumlah 24,696,350.00
Overhead & Profit 15 % 3,704,452.50

Nilai HSPK : 28,400,803.00


2.02.03.02.01.023 Pengadaan dan Pemasangan Lampu Unit Nilai HSPK 23,327,118.00
Peringatan Tenaga Surya (Warning (dibulatkan) :
Light Solar Cell) Tiang Lurus

Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
1.3.2.18.01.01.003.00198 Battery Jenis VRLA Deep Cycle PV 1.000 pcs 2,113,000 2,113,000.00
Kapasitas 50 Ah 12 V
1.3.2.18.01.01.001.00002 Lampu Traffic Light (Box Lamp) 2 1.000 Unit 3,599,200 3,599,200.00
aspek 30 Cm LED (Super Bright)
1.3.2.18.01.01.003.00227 Controller Solar Cell 50 WP 1.000 Unit 1,277,200.00 1,277,200.00
1.3.2.18.01.01.003.00226 Solar Cell 50 Watt 12 Volt 1.000 Unit 1,039,200.00 1,039,200.00
1.3.2.18.01.01.003.00188 Delineator (Patok Pengaman) 3.000 pcs 362,300 1,086,900.00
1.3.2.18.01.01.003.00132 Tiang lurus 1.000 Unit 4,412,000 4,412,000.00
2.01.01.01.02.004 Galian Tanah 2.400 m3 108,284.00 259,881.60
2.01.01.03.01.005 Pengecoran 0.600 m3 1,295,114.00 777,068.40
1.3.2.18.01.01.003.00229 Pemasangan dan Akomodasi 1.000 Ls 5,720,000.00 5,720,000.00
Jumlah Harga Bahan 20,284,450.00
Peralatan
Jumlah Harga Peralatan
Jumlah 20,284,450.00
Overhead & Profit 15 % 3,042,667.50

Nilai HSPK : 23,327,118.00


2.02.03.02.01.024 1 Unit Pengadaan dan Pemasangan Unit Nilai HSPK 250,533,154.00
Alat Pengendali Isyarat Lalu Lintas (dibulatkan) :
Persimpangan 3 Kaki

Tenaga Kerja

228
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Jumlah Harga Tenaga Kerja
Bahan
1.1.7.01.01.01.004.00003 Pasir Urug 2.500 m3 162,550 406,375.00
1.1.7.01.01.01.008.00059 Besi Bulat Uk. 1inch. 2.000 Batang 83,900 167,800.00
1.1.7.01.01.01.008.00060 Besi Bulat Uk. 1,25inch. 2.000 Batang 146,300 292,600.00
1.1.7.02.02.06.001.00069 Pipa PVC Maspion, C 5/8inch. x 4 cm 40.000 Batang 8,700 348,000.00

1.3.2.18.01.01.003.00197 Armatur Box Lampu Warning Light 15.000 Buah 120,200 1,803,000.00

1.1.7.01.03.08.001.00019 Kabel NYY Supreme, 4 x 3 mm 60.000 m 37,350 2,241,000.00


1.1.7.01.03.08.001.00018 Kabel NYY Supreme, 4 x 2,5 mm 400.000 m 28,750 11,500,000.00
1.3.2.18.01.01.003.00034 MCB Schneider, MG Domae, 1 Phase 1.000 Buah 57,700 57,700.00
4.5 kA, 2 A
1.3.2.18.01.01.003.00160 Terminal Kabel 8.000 Buah 24,100 192,800.00
1.3.2.18.01.01.001.00003 Lampu Traffic Light (Box Lamp) 2 8.000 Buah 2,612,400 20,899,200.00
aspek 20 Cm LED (Super Bright)
1.3.2.18.01.01.001.00001 Lampu Traffic Light (Box Lamp) 3 9.000 Buah 6,095,400 54,858,600.00
aspek 30 Cm LED (Super Bright)
1.3.2.18.01.01.003.00225 Controller 4 Phase 2 pedestrian & 1.000 set 35,000,000 35,000,000.00
Box Luar Untuk Persimpangan 4 Kaki

1.3.2.18.01.01.003.00188 Delineator (Patok Pengaman) 9.000 Buah 362,300 3,260,700.00


1.3.2.18.01.01.003.00228 Rambu Tabel 15 plus Pasang 3.000 set 873,300.00 2,619,900.00
1.3.2.18.01.01.003.00131 Tiang lurus Galvanis, Octagonal 3.000 Batang 5,108,600 15,325,800.00
5inch.
1.3.2.18.01.01.003.00131 Tiang lurus Galvanis, Octagonal 3.000 Batang 5,108,600 15,325,800.00
5inch.
2.02.03.02.01.011 Penggelaran Kabel 460.000 m 5,785.00 2,661,100.00
2.02.03.02.01.012 Pemasangan Pipa PVC 160.000 m 4,373.00 699,680.00
2.02.03.02.01.013 Gali dan Tutup Aspal 100.000 m2 199,633.00 19,963,300.00
2.01.01.01.02.004 Gali dan Tutup Tanah Keras 100.000 m3 108,284.00 10,828,400.00
2.01.01.03.01.005 Pengecoran Tiang Over Head 1.400 m3 1,295,114.00 1,813,159.60
2.01.01.03.01.005 Pengecoran Tiang Lurus 0.820 m3 1,295,114.00 1,061,993.48
2.01.01.03.01.005 Pengecoran Tiang Patok Pengaman 2.240 m3 1,295,114.00 2,901,055.36

1.3.2.18.01.01.003.00159 Pasang dan Stel terminal kabel 8.000 Set 20,900 167,200.00
1.3.2.18.01.01.003.00210 Pasang dan Set Box lampu 15.000 Set 61,500 922,500.00
1.10.28.03.02.001.001 Pasang dan Stel 1 Pesawat dan 1.000 Set 247,800 247,800.00
Sekering
2.02.03.02.01.004 Pembuatan Dudukan Box Kontrol 1.000 Buah 726,045.00 726,045.00
2.02.03.02.01.015 Pengecatan Patok Pengaman 21.000 Buah 51,448.00 1,080,408.00
2.02.03.02.01.017 Pengecatan Marka dan Zebra Cross 100.000 m' 57,465.00 5,746,500.00

1.10.28.03.02.001.003 Biaya Penyambungan PLN 1.000 Set 2,577,700 2,577,700.00


1.3.2.18.01.01.003.00211 Biaya Programming 1.000 Set 2,158,800 2,158,800.00
Jumlah Harga Bahan 217,854,916.44
Peralatan
Jumlah Harga Peralatan
Jumlah 217,854,916.44
Overhead & Profit 15 % 32,678,237.47

Nilai HSPK : 250,533,154.00


2.02.03.02.01.025 1 Unit Pengadaan dan Pemasangan Unit Nilai HSPK 295,802,912.00
Alat Pengendali Isyarat Lalu Lintas (dibulatkan) :
Persimpangan 4 Kaki

Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
1.1.7.01.01.01.004.00003 Pasir Urug 3.000 m3 162,550 487,650.00
1.1.7.01.01.01.008.00059 Besi Bulat Uk. 1inch. 2.000 Batang 83,900 167,800.00
1.1.7.01.01.01.008.00060 Besi Bulat Uk. 1,25inch. 2.000 Batang 146,300 292,600.00
1.1.7.02.02.06.001.00069 Pipa PVC Maspion, C 5/8inch. x 4 cm 50.000 Batang 8,700 435,000.00

229
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
1.3.2.18.01.01.003.00197 Armatur Box Lampu Warning Light 20.000 Buah 120,200 2,404,000.00

1.1.7.01.03.08.001.00019 Kabel NYY Supreme, 4 x 3 mm 60.000 m 37,350 2,241,000.00


1.1.7.01.03.08.001.00018 Kabel NYY Supreme, 4 x 2,5 mm 500.000 m 28,750 14,375,000.00
1.3.2.18.01.01.003.00034 MCB Schneider, MG Domae, 1 Phase 1.000 Buah 57,700 57,700.00
4.5 kA, 2 A
1.3.2.18.01.01.003.00160 Terminal Kabel 10.000 Buah 24,100 241,000.00
1.3.2.18.01.01.001.00003 Lampu Traffic Light (Box Lamp) 2 8.000 buah 2,612,400 20,899,200.00
aspek 20 Cm LED (Super Bright)
1.3.2.18.01.01.001.00001 Lampu Traffic Light (Box Lamp) 3 12.000 buah 6,095,400 73,144,800.00
aspek 30 m PIJAR
1.3.2.18.01.01.003.00225 Controller 4 Phase 2 pedestrian & 1.000 set 35,000,000 35,000,000.00
Box Luar Untuk Persimpangan 4 Kaki

1.3.2.18.01.01.003.00188 Delineator (Patok Pengaman) 12.000 Buah 362,300 4,347,600.00


1.3.2.18.01.01.003.00228 Rambu Tabel 15 plus Pasang 4.000 set 873,300.00 3,493,200.00
1.3.2.18.01.01.003.00131 Tiang lurus Galvanis, Octagonal 4.000 Batang 5,108,600 20,434,400.00
5inch.
1.3.2.18.01.01.003.00131 Tiang lurus Galvanis, Octagonal 4.000 Batang 5,108,600 20,434,400.00
5inch.
2.02.03.02.01.011 Penggelaran Kabel 560.000 m 5,785.00 3,239,600.00
2.02.03.02.01.012 Pemasangan Pipa PVC 200.000 m 4,373.00 874,600.00
2.02.03.02.01.013 Gali dan Tutup Aspal 100.000 m3 199,633.00 19,963,300.00
2.01.01.01.02.004 Gali dan Tutup Tanah Keras 120.000 m3 108,284.00 12,994,080.00
2.01.01.03.01.005 Pengecoran Tiang Over Head 1.870 m3 1,295,114.00 2,421,863.18
2.01.01.03.01.005 Pengecoran Tiang Lurus 1.100 m3 1,295,114.00 1,424,625.40
2.01.01.03.01.005 Pengecoran Tiang Patok Pengaman 2.750 m3 1,295,114.00 3,561,563.50

1.3.2.18.01.01.003.00159 Pasang dan Stel terminal kabel 10.000 set 20,900 209,000.00
1.3.2.18.01.01.003.00210 Pasang dan Set Box lampu 20.000 Buah 61,500 1,230,000.00
1.10.28.03.02.001.001 Pasang dan Stel 1 Pesawat dan 1.000 set 247,800 247,800.00
Sekering
2.02.03.02.01.004 Pembuatan Dudukan Box Kontrol 1.000 Buah 726,045.00 726,045.00
2.02.03.02.01.015 Pengecatan Tiang dan Patok 27.000 Buah 51,448.00 1,389,096.00
Pengaman
2.02.03.02.01.017 Pengecatan Marka dan Zebra Cross 100.000 m' 57,465.00 5,746,500.00

1.10.28.03.02.001.003 Biaya Penyambungan PLN 1.000 Set 2,577,700 2,577,700.00


1.3.2.18.01.01.003.00211 Biaya Programming 1.000 Set 2,158,800 2,158,800.00
Jumlah Harga Bahan 257,219,923.08
Peralatan
Jumlah Harga Peralatan
Jumlah 257,219,923.08
Overhead & Profit 15 % 38,582,988.46

Nilai HSPK : 295,802,912.00


2.02.03.02.01.026 1 Unit Pengadaan & Pemasangan Unit Nilai HSPK 1,119,050.00
Rambu Lalu Lintas uk. 45 x 45 cm (dibulatkan) :

Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
1.1.7.01.01.01.008.00011 Besi Plat StripUk. 4 x 30 mm x 6 m 0.600 Kg 63,900 38,340.00

1.1.7.01.01.01.008.00064 Besi Angkur Uk. 30 x 30 x 3 mm 0.600 m 27,900 16,740.00


1.1.7.01.01.01.022.00126 Mur Baut Uk. 10 mm 4.000 Buah 5,750 23,000.00
1.1.7.02.02.07.001.00005 Pipa Galvanis Dia, 1-1/2inch. @6m 0.500 Batang 467,800 233,900.00
Medium A
1.3.2.18.01.01.003.00163 Tutup Pipa 1.5inch. 1.000 Buah 5,300 5,300.00
1.3.2.18.01.01.003.00183 Daun Rambu Reflective Sheeting 0.200 m2 950,800 190,160.00
Tebal 1,8 mm
2.02.03.02.01.014 Cat Belakang Daun Rambu 0.200 m2 130,086.00 26,017.20
2.02.03.02.01.002 Pemotongan dan Pengeboran 1.000 Unit 10,416.00 10,416.00
2.01.01.07.03.005 Pengelasan 14.300 cm 5,137.00 73,459.10

230
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
2.02.03.02.01.003 Perakitan dan Penyetelan 1.000 Unit 54,913 54,913.00
2.01.01.03.01.005 Cor Pondasi Beton 0.110 m3 1,295,114.00 142,462.54
2.01.01.01.02.001 Galian Tanah 0.250 m3 81,363.00 20,340.75
2.01.01.01.02.009 Urugan Tanah Kembali 0.250 m3 59,225.00 14,806.25
2.01.01.01.02.019 Pasir Urug 0.040 m3 256,864.00 10,274.56
2.02.03.02.01.001 Bekisting Pondasi 1.120 m3 82,735.00 92,663.20
2.02.03.02.01.005 Ongkos Angkut ke Lokasi 1.000 Buah 20,294.00 20,294.00
Jumlah Harga Bahan 973,086.60
Peralatan
Jumlah Harga Peralatan
Jumlah 973,086.60
Overhead & Profit 15 % 145,962.99

Nilai HSPK : 1,119,050.00


2.02.03.02.01.027 1 Unit Pengadaan & Pemasangan Unit Nilai HSPK 1,317,992.00
Rambu Lalu Lintas uk. 60 x 60 cm (dibulatkan) :

Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
1.1.7.01.01.01.008.00011 Besi Plat Strip Uk. 4 x 30 mm x 6 m 0.600 m 63,900 38,340.00

1.1.7.01.01.01.008.00064 Besi Angkur Uk. 30 x 30 x 3 mm 0.600 m 27,900 16,740.00


1.1.7.01.01.01.022.00126 Mur Baut Uk. 10 mm 4.000 Buah 5,750 23,000.00
1.1.7.02.02.07.001.00005 Pipa Galvanis Dia, 1-1/2inch. @6m 0.500 Batang 467,800 233,900.00
Medium A
1.3.2.18.01.01.003.00163 Tutup Pipa 1.5inch. 1.000 Buah 5,300 5,300.00
1.3.2.18.01.01.003.00183 Daun Rambu Reflective Sheeting 0.360 m2 950,800 342,288.00
Tebal 1,8 mm
2.02.03.02.01.014 Cat Belakang Daun Rambu 0.360 m2 130,086.00 46,830.96
2.02.03.02.01.002 Pemotongan dan Pengeboran 1.000 Unit 10,416.00 10,416.00
2.01.01.07.03.005 Pengelasan 14.310 cm 5,137.00 73,510.47
2.02.03.02.01.003 Perakitan dan Penyetelan 1.000 Unit 54,913 54,913.00
2.01.01.03.01.005 Cor Pondasi Beton 0.110 m3 1,295,114.00 142,462.54
2.01.01.01.02.001 Galian Tanah 0.250 m3 81,363.00 20,340.75
2.01.01.01.02.009 Urugan Tanah Kembali 0.250 m3 59,225.00 14,806.25
2.01.01.01.02.019 Pasir Urug 0.040 m3 256,864.00 10,274.56
2.02.03.02.01.001 Bekisting Pondasi 1.120 m3 82,735.00 92,663.20
2.02.03.02.01.005 Ongkos Angkut ke Lokasi 1.000 Buah 20,294.00 20,294.00
Jumlah Harga Bahan 1,146,079.73
Peralatan
Jumlah Harga Peralatan
Jumlah 1,146,079.73
Overhead & Profit 15 % 171,911.96

Nilai HSPK : 1,317,992.00


2.02.03.02.01.028 1 Unit Pengadaan & Pemasangan Unit Nilai HSPK 1,763,154.00
Rambu Lalu Lintas uk. 75 x 75 cm (dibulatkan) :

Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
1.1.7.01.01.01.008.00039 Besi Siku L Uk. 30 x 30 x 3 3.264 Kg 13,350 43,574.40
1.1.7.01.01.01.022.00126 Mur Baut Uk. 10 mm 4.000 Buah 5,750 23,000.00
1.1.7.02.02.07.001.00006 Pipa Galvanis Dia, 2inch. @6m 0.667 Batang 638,450 425,654.62
Medium A
1.3.2.18.01.01.003.00183 Daun Rambu Reflective Sheeting 0.563 m2 950,800 534,825.00
Tebal 1,8 mm
1.3.2.18.01.01.003.00208 Sticker perlengkapan jalan 1.000 Buah 8,400 8,400.00
2.02.03.02.01.014 Cat Belakang Daun Rambu 0.560 m2 130,086.00 72,848.16
2.02.03.02.01.002 Pemotongan dan Pengeboran 1.000 Unit 10,416.00 10,416.00
2.01.01.07.03.005 Pengelasan 14.310 cm 5,137.00 73,510.47
2.02.03.02.01.003 Perakitan dan Penyetelan 1.000 Unit 54,913 54,913.00
2.01.01.03.01.005 Cor Pondasi Beton 0.110 m3 1,295,114.00 142,462.54

231
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
2.01.01.01.02.001 Galian Tanah dan Urug Kembali 0.250 m3 81,363.00 20,340.75
2.01.01.01.02.019 Pasir Urug 0.040 m3 256,864.00 10,274.56
2.02.03.02.01.001 Bekisting Pondasi 1.120 m2 82,735.00 92,663.20
2.02.03.02.01.005 Ongkos Angkut ke Lokasi 1.000 Buah 20,294.00 20,294.00
Jumlah Harga Bahan 1,533,176.70
Peralatan
Jumlah Harga Peralatan
Jumlah 1,533,176.70
Overhead & Profit 15 % 229,976.50

Nilai HSPK : 1,763,154.00


2.02.03.02.01.029 1 Unit Pengadaan & Pemasangan Unit Nilai HSPK 2,336,163.00
Rambu Lalu Lintas uk. 90 x 90 cm (dibulatkan) :

Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
1.1.7.01.01.01.008.00039 Besi Siku L Uk. 30 x 30 x 3 4.393 Kg 13,350 58,646.55
1.1.7.01.01.01.022.00126 Mur Baut Uk. 10 mm 8.000 Buah 5,750 46,000.00
1.1.7.02.02.07.001.00006 Pipa Galvanis Dia, 2inch. @6m 0.667 Batang 638,450 425,654.62
Medium A
1.3.2.18.01.01.003.00164 Tutup Pipa 2inch. 1.000 Unit 11,700 11,700.00
1.3.2.18.01.01.003.00183 Daun Rambu Reflective Sheeting 1.000 m2 950,800 950,800.00
Tebal 1,8 mm
1.3.2.18.01.01.003.00208 Sticker perlengkapan jalan 1.000 Buah 8,400 8,400.00
2.02.03.02.01.014 Cat Belakang Daun Rambu 0.810 m2 130,086.00 105,369.66
2.02.03.02.01.002 Pemotongan dan Pengeboran 1.000 Unit 10,416.00 10,416.00
2.01.01.07.03.005 Pengelasan 14.310 cm 5,137.00 73,510.47
2.02.03.02.01.003 Perakitan dan Penyetelan 1.000 Unit 54,913 54,913.00
2.01.01.03.01.005 Cor Pondasi Beton 0.110 m3 1,295,114.00 142,462.54
2.01.01.01.02.001 Galian Tanah dan Urug Kembali 0.250 m3 81,363.00 20,340.75
2.01.01.01.02.019 Pasir Urug 0.040 m3 256,864.00 10,274.56
2.02.03.02.01.001 Bekisting Pondasi 1.120 m2 82,735.00 92,663.20
2.02.03.02.01.005 Ongkos Angkut ke Lokasi 1.000 Buah 20,294.00 20,294.00
Jumlah Harga Bahan 2,031,445.35
Peralatan
Jumlah Harga Peralatan
Jumlah 2,031,445.35
Overhead & Profit 15 % 304,716.80

Nilai HSPK : 2,336,163.00


2.02.03.02.01.030 1 Unit Pengadaan dan Pemasangan Unit Nilai HSPK 9,167,300.00
Pagar Pengaman Jalan 4 m (Terminal (dibulatkan) :
End Masuk Kedalam Tanah)

Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
1.1.7.01.01.01.008.00083 Pengikat Baja profil Desain (Blocking) 3.000 Buah 76,200 228,600.00

1.1.7.01.01.01.008.00064 Besi Angkur Uk. 30 x 30 x 3 mm 5.250 m' 27,900 146,475.00


1.1.7.01.01.01.022.00116 Baut Mur Beam, Uk. 12 x 25 mm 10.000 Buah 7,850 78,500.00

1.1.7.01.01.01.022.00117 Baut Blocking, Uk. 16 x 30 mm 14.000 Buah 8,450 118,300.00


1.1.7.01.01.01.022.00118 Baut Mur Post, Uk. 16 x 48 mm 3.000 Buah 8,000 24,000.00
1.1.7.01.01.01.008.00085 Lempengan Besi Baja Profil Desain 1.000 Batang 1,015,850 1,015,850.00
Galvanis
1.3.2.18.01.01.003.00128 Tiang Penyangga Besi Struktur 3.000 Batang 724,200 2,172,600.00
Pengendali
1.3.2.18.01.01.003.00158 Terminal End (Sleeve Beam) Type 2 2.000 Buah 389,000 778,000.00

2.01.01.01.02.001 Galian Tanah 3.920 m3 81,363.00 318,942.96


2.01.01.01.02.009 Urugan Tanah Kembali 3.920 m3 59,225.00 232,162.00

232
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
2.01.01.01.02.019 Pasir Urug 0.460 m3 256,864.00 118,157.44
2.02.03.02.01.001 Bekisting Pondasi 13.630 m3 82,735.00 1,127,678.05
2.01.01.03.01.005 Cor Pondasi Beton 1.190 m3 1,295,114.00 1,541,185.66
2.02.03.02.01.006 Ongkos Angkut ke Lokasi 1.000 Buah 71,114.00 71,114.00
Jumlah Harga Bahan 7,971,565.11
Peralatan
Jumlah Harga Peralatan
Jumlah 7,971,565.11
Overhead & Profit 15 % 1,195,734.77

Nilai HSPK : 9,167,300.00


2.02.03.02.01.031 1 Unit Pengadaan dan Pemasangan Unit Nilai HSPK 6,878,128.00
Pagar Pengaman Jalan 4 m (Terminal (dibulatkan) :
End Lengkung)

Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
1.1.7.01.01.01.008.00083 Pengikat Baja profil Desain (Blocking) 3.000 Buah 76,200 228,600.00

1.1.7.01.01.01.008.00064 Besi Angkur Uk. 30 x 30 x 3 mm 2.250 m' 27,900 62,775.00


1.1.7.01.01.01.022.00116 Baut Mur Beam, Uk. 12 x 25 mm 10.000 Buah 7,850 78,500.00

1.1.7.01.01.01.022.00117 Baut Blocking, Uk. 16 x 30 mm 14.000 Buah 8,450 118,300.00


1.1.7.01.01.01.022.00118 Baut Mur Post, Uk. 16 x 48 mm 3.000 Buah 8,000 24,000.00
1.1.7.01.01.01.008.00085 Lempengan Besi Baja Profil Desain 1.000 Batang 1,015,850 1,015,850.00
Galvanis
1.3.2.18.01.01.003.00128 Tiang Penyangga Besi Struktur 3.000 Batang 724,200 2,172,600.00
Pengendali
1.3.2.18.01.01.003.00158 Terminal End (Sleeve Beam) Type 2 2.000 Buah 389,000 778,000.00

2.01.01.01.02.001 Galian Tanah 1.680 m3 81,363.00 136,689.84


2.01.01.01.02.009 Urugan Tanah Kembali 1.680 m3 59,225.00 99,498.00
2.01.01.01.02.019 Pasir Urug 0.200 m3 256,864.00 51,372.80
2.02.03.02.01.001 Bekisting Pondasi 5.840 m3 82,735.00 483,172.40
2.01.01.03.01.005 Cor Pondasi Beton 0.510 m3 1,295,114.00 660,508.14
2.02.03.02.01.006 Ongkos Angkut ke Lokasi 1.000 Buah 71,114.00 71,114.00
Jumlah Harga Bahan 5,980,980.18
Peralatan
Jumlah Harga Peralatan
Jumlah 5,980,980.18
Overhead & Profit 15 % 897,147.03

Nilai HSPK : 6,878,128.00


2.02.03.02.01.032 1 Unit Pengadaan dan Pemasangan Unit Nilai HSPK 344,979.00
Paku Jalan Ukuran 10 x 10 x 2 cm (dibulatkan) :

Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
1.1.7.01.01.01.022.00041 Aluminium Alloy 10 x 10 x 2 cm 1.000 Buah 65,150 65,150.00
1.3.2.18.01.01.003.00195 Mata Kucing/Reflektor 2.000 Buah 84,300 168,600.00
1.1.7.01.01.01.022.00280 Lem Mixed Epoxy Adhesive 0.130 Kg 163,500 21,255.00
2.02.03.02.01.009 Pengeboran dan Pemasangan Paku 1.000 ls 41,400.00 41,400.00
Jalan
2.02.03.02.01.008 Ongkos Angkut ke Lokasi 1.000 ls 3,576.00 3,576.00
Jumlah Harga Bahan 299,981.00
Peralatan
Jumlah Harga Peralatan
Jumlah 299,981.00
Overhead & Profit 15 % 44,997.15

Nilai HSPK : 344,979.00

233
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
2.02.03.02.01.033 1 Unit Pengadaan dan Pemasangan Unit Nilai HSPK 375,626.00
Paku Jalan Ukuran 10 x 12 x 2 cm (dibulatkan) :

Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
1.1.7.01.01.01.022.00042 Aluminium Alloy 10 x 12 x 2 cm 1.000 Buah 91,800 91,800.00
1.3.2.18.01.01.003.00195 Mata Kucing/Reflektor 2.000 Buah 84,300 168,600.00
1.1.7.01.01.01.022.00280 Lem Mixed Epoxy Adhesive 0.130 Kg 163,500 21,255.00
2.02.03.02.01.009 Pengeboran dan Pemasangan Paku 1.000 Unit 41,400.00 41,400.00
Jalan
2.02.03.02.01.008 Ongkos Angkut ke Lokasi 1.000 Unit 3,576.00 3,576.00
Jumlah Harga Bahan 326,631.00
Peralatan
Jumlah Harga Peralatan
Jumlah 326,631.00
Overhead & Profit 15 % 48,994.65

Nilai HSPK : 375,626.00


2.02.03.02.01.034 1 Unit Pengadaan dan Pemasangan Unit Nilai HSPK 314,573.00
Paku Jalan Bulat (Tempered) (dibulatkan) :

Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
1.3.2.18.01.01.003.00189 Paku Jalan Bentuk Bulat 1.000 Buah 174,400 174,400.00
1.1.7.01.01.01.022.00280 Lem Mixed Epoxy Adhesive 0.230 Kg 163,500 37,605.00
2.02.03.02.01.010 Pengeboran dan Pemasangan Paku 1.000 Unit 57,960.00 57,960.00
Jalan Bulat (Tempered)
2.02.03.02.01.008 Ongkos Angkut ke Lokasi 1.000 Unit 3,576.00 3,576.00
Jumlah Harga Bahan 273,541.00
Peralatan
Jumlah Harga Peralatan
Jumlah 273,541.00
Overhead & Profit 15 % 41,031.15

Nilai HSPK : 314,573.00


2.02.03.02.01.035 1 Unit Pengadaan dan Pemasangan Unit Nilai HSPK 936,726.00
Patok Tikungan Pipa Plastik (dibulatkan) :

Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
1.3.2.18.01.01.003.00188 Delineator Plastik 1.000 Buah 362,300 362,300.00
1.3.2.18.01.01.003.00196 Reflektor High Intensity Grade uk. 2.000 Buah 87,500 175,000.00
10 x 20 cm
1.1.7.01.01.01.006.00005 Cat Besi 0.340 Kg 75,500 25,670.00
2.01.01.03.01.005 Cor Pondasi Beton 0.100 m3 1,295,114.00 129,511.40
2.01.01.01.02.001 Galian Tanah 0.180 m3 81,363.00 14,645.34
2.01.01.01.02.009 Urugan Tanah Kembali 0.180 m3 59,225.00 10,660.50
2.01.01.01.02.019 Pasir Urug 0.040 m3 256,864.00 10,274.56
2.02.03.02.01.001 Bekisting Beton Patok Tikungan 0.800 m3 82,735.00 66,188.00
2.02.03.02.01.005 Ongkos Angkut ke Lokasi 1.000 Buah 20,294.00 20,294.00
Jumlah Harga Bahan 814,543.80
Peralatan
Jumlah Harga Peralatan
Jumlah 814,543.80
Overhead & Profit 15 % 122,181.57

Nilai HSPK : 936,726.00


2.02.03.02.01.036 1 Unit Pengadaan dan Pemasangan Unit Nilai HSPK 773,771.00
Patok Tikungan Pipa Besi (dibulatkan) :

Tenaga Kerja

234
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Jumlah Harga Tenaga Kerja
Bahan
1.3.2.18.01.01.003.00187 Delineator Pipa Besi 1.000 Buah 220,600 220,600.00
1.3.2.18.01.01.003.00196 Reflektor High Intensity Grade uk. 2.000 Buah 87,500 175,000.00
10 x 20 cm
1.1.7.01.01.01.006.00005 Cat Besi 0.340 Kg 75,500 25,670.00
2.01.01.03.01.005 Cor Pondasi Beton 0.100 m3 1,295,114.00 129,511.40
2.01.01.01.02.001 Galian Tanah 0.180 m3 81,363.00 14,645.34
2.01.01.01.02.009 Urugan Tanah Kembali 0.180 m3 59,225.00 10,660.50
2.01.01.01.02.019 Pasir Urug 0.040 m3 256,864.00 10,274.56
2.02.03.02.01.001 Bekisting Beton Patok Tikungan 0.800 m3 82,735.00 66,188.00
2.02.03.02.01.005 Ongkos Angkut ke Lokasi 1.000 Buah 20,294.00 20,294.00
Jumlah Harga Bahan 672,843.80
Peralatan
Jumlah Harga Peralatan
Jumlah 672,843.80
Overhead & Profit 15 % 100,926.57

Nilai HSPK : 773,771.00


2.02.03.02.01.037 1 Unit Pengadaan dan Pemasangan Unit Nilai HSPK 2,957,921.00
Cermin Tikungan (dibulatkan) :

Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
1.1.7.01.01.01.008.00083 Pengikat Baja profil Desain (Blocking) 1.000 Buah 76,200 76,200.00

1.1.7.01.01.01.008.00064 Besi Angkur Uk. 30 x 30 x 3 mm 0.600 m 27,900 16,740.00


1.1.7.01.01.01.022.00126 Mur Baut Uk. 10 mm 4.000 Buah 5,750 23,000.00
1.1.7.02.02.07.001.00006 Pipa Galvanis Dia, 2inch. @6m 0.733 Batang 638,450 468,239.23
Medium A
1.3.2.18.01.01.003.00164 Tutup Pipa 2inch. 1.000 Buah 11,700 11,700.00
1.3.2.18.01.01.003.00179 Cermin Arcrylic (Cermin Tikungan) 1.000 Unit 1,414,200 1,414,200.00
Cembung, Dia 90-100 m

2.02.03.02.01.002 Pemotongan dan Pengeboran 1.000 Batang 10,416.00 10,416.00


2.01.01.07.03.005 Pengelasan 4.000 cm 5,137.00 20,548.00
2.02.03.02.01.003 Perakitan dan Penyetelan 1.000 Unit 54,913 54,913.00
2.01.01.03.01.005 Cor Pondasi Beton 0.240 m3 1,295,114.00 310,827.36
2.01.01.01.02.001 Galian Tanah 0.300 m3 81,363.00 24,408.90
2.01.01.01.02.009 Urugan Tanah Kembali 0.300 m3 59,225.00 17,767.50
2.01.01.01.02.019 Pasir Urug 0.030 m3 256,864.00 7,705.92
2.02.03.02.01.001 Bekisting Pondasi 1.150 m3 82,735.00 95,145.25
2.02.03.02.01.005 Ongkos Angkut ke Lokasi 1.000 Buah 20,294.00 20,294.00
Jumlah Harga Bahan 2,572,105.16
Peralatan
Jumlah Harga Peralatan
Jumlah 2,572,105.16
Overhead & Profit 15 % 385,815.77

Nilai HSPK : 2,957,921.00


2.02.03.02.01.038 1 Unit Pengadaan dan Pemasangan Unit Nilai HSPK 25,444,498.00
RPPJ 120 x 180 (Overhead) (dibulatkan) :

Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
1.1.7.01.01.01.008.00039 Besi Siku L Uk. 30 x 30 x 3 12.920 Kg 13,350 172,482.00
1.1.7.01.01.01.008.00077 Angkur Dia. 19 mm Panjang 60 cm 4.000 Buah 83,350 333,400.00

1.1.7.01.01.01.022.00127 Mur Baut Pengaman 16.000 Buah 4,850 77,600.00


1.1.7.01.01.01.008.00082 Tutup Baut Angkur 4.000 Buah 18,600 74,400.00
1.1.7.01.01.01.022.00108 Rivet / Panel 22.000 Buah 7,950 174,900.00
1.1.7.01.01.01.022.00473 Klem 3x40x450 mm 16.000 Buah 17,450 279,200.00

235
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
1.1.7.01.01.01.022.00129 Mur Baut Uk. 3/4inch. 8.000 Buah 1,300 10,400.00
1.1.7.02.02.07.001.00339 Flange Pipa dia. 3inch. t=10 mm 4.000 Buah 161,100 644,400.00
1.1.7.02.02.07.001.00006 Pipa Galvanis Dia, 2inch. @6m 1.000 Batang 638,450 638,450.00
Medium A
1.1.7.02.02.07.001.00011 Pipa Galvanis Dia, 6inch. @6m 1.000 Batang 2,440,050 2,440,050.00
Medium A
1.1.7.02.02.07.001.00041 Pipa Hitam Dia. 1-1/2inch. @6m 0.267 Btg 328,500 87,610.95
Medium A
1.1.7.02.02.07.001.00340 Rib Base Plate t=10mm 4.000 Buah 146,800 587,200.00
1.1.7.02.02.07.001.00341 Rib Plate Flange Pipa dia 3inch. t=10 24.000 Buah 19,000 456,000.00
mm
1.3.2.18.01.01.003.00166 Tutup Pipa 3inch. 4.000 Buah 15,100 60,400.00
1.3.2.18.01.01.003.00169 Tutup Pipa 6inch. 1.000 Buah 20,900 20,900.00
1.1.7.02.02.07.001.00342 Base Plate (400x400x12 mm) 1.000 Buah 428,500 428,500.00
1.3.2.18.01.01.003.00172 Daun RPPJ 120 x 180 m Dengan 1.000 Lembar 2,282,000 2,282,000.00
Reflektif Sheeting Tebal 2 mm
1.1.7.01.03.09.006.00010 Logo Kementerian 1.000 Buah 19,300 19,300.00
2.01.01.01.02.004 Galian Tanah Keras 0.560 m3 108,284.00 60,639.04
2.01.01.03.01.005 Pekerjaan Pengecoran 0.430 m3 1,295,114.00 556,899.02
2.01.01.03.01.014 Pekerjaan Pembesian 36.000 Kg 22,769.00 819,684.00
2.01.01.01.02.020 Tanah Sirtu 0.050 m3 278,013.00 13,900.65
2.01.01.07.03.001 Biaya pembuatan/ pengelasan 293.400 Kg 34,319.00 10,069,194.60
2.02.03.02.01.001 Bekisting Pondasi 3.600 m3 82,735.00 297,846.00
2.02.03.02.01.005 Ongkos Angkut ke Lokasi 1.000 Unit 20,294.00 20,294.00
Jumlah Harga Bahan 20,625,650.26
Peralatan
9.1.2.09.03.01.001.00024 Crane Kapasitas ; 25 ton 0.500 Unit-Hari 3,000,000 1,500,000.00
Jumlah Harga Peralatan 1,500,000.00
Jumlah 22,125,650.26
Overhead & Profit 15 % 3,318,847.54

Nilai HSPK : 25,444,498.00


2.02.03.02.01.039 1 Unit Pengadaan dan Pemasangan Unit Nilai HSPK 26,273,213.00
RPPJ 120 x 240 (Overhead) (dibulatkan) :

Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
1.1.7.01.01.01.008.00039 Besi Siku L Uk. 30 x 30 x 3 14.380 Kg 13,350 191,973.00
1.1.7.01.01.01.008.00077 Angkur Dia. 19 mm Panjang 60 cm 4.000 Buah 83,350 333,400.00

1.1.7.01.01.01.022.00127 Mur Baut Pengaman 16.000 Buah 4,850 77,600.00


1.1.7.01.01.01.008.00082 Tutup Baut Angkur 4.000 Buah 18,600 74,400.00
1.1.7.01.01.01.022.00108 Rivet / Panel 22.000 Buah 7,950 174,900.00
1.1.7.01.01.01.022.00473 Klem 3x40x450 mm 16.000 Buah 17,450 279,200.00
1.1.7.01.01.01.022.00129 Mur Baut Uk. 3/4inch. 8.000 Buah 1,300 10,400.00
1.1.7.02.02.07.001.00339 Flange Pipa dia. 3inch. t=10 mm 4.000 Buah 161,100 644,400.00
1.1.7.02.02.07.001.00006 Pipa Galvanis Dia, 2inch. @6m 1.000 Batang 638,450 638,450.00
Medium A
1.1.7.02.02.07.001.00011 Pipa Galvanis Dia, 6inch. @6m 1.000 Batang 2,440,050 2,440,050.00
Medium A
1.1.7.02.02.07.001.00041 Pipa Hitam Dia. 1-1/2inch. @6m 0.267 Btg 328,500 87,610.95
Medium A
1.1.7.02.02.07.001.00340 Rib Base Plate t=10mm 4.000 Buah 146,800 587,200.00
1.1.7.02.02.07.001.00341 Rib Plate Flange Pipa dia 3inch. t=10 24.000 Buah 19,000 456,000.00
mm
1.3.2.18.01.01.003.00166 Tutup Pipa 3inch. 4.000 Buah 15,100 60,400.00
1.3.2.18.01.01.003.00169 Tutup Pipa 6inch. 1.000 Buah 20,900 20,900.00
1.1.7.02.02.07.001.00342 Base Plate (400x400x12 mm) 1.000 Buah 428,500 428,500.00
1.3.2.18.01.01.003.00173 Daun RPPJ 120 x 240 m Dengan 1.000 Lembar 3,042,700 3,042,700.00
Reflektif Sheeting Tebal 2 mm
1.1.7.01.03.09.006.00010 Logo Kementerian 1.000 Buah 19,300 19,300.00
2.01.01.01.02.004 Galian Tanah Keras 0.560 m3 108,284.00 60,639.04
2.01.01.03.01.005 Pekerjaan Pengecoran 0.430 m3 1,295,114.00 556,899.02

236
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
2.01.01.03.01.014 Pekerjaan Pembesian 36.000 Kg 22,769.00 819,684.00
2.01.01.01.02.020 Tanah Sirtu 0.050 m3 278,013.00 13,900.65
2.02.03.02.01.001 Bekisting Pondasi 2.880 m3 82,735.00 238,276.80
2.01.01.07.03.001 Biaya pembuatan/ pengelasan 293.400 Kg 34,319.00 10,069,194.60
2.02.03.02.01.005 Ongkos Angkut ke Lokasi 1.000 Unit 20,294.00 20,294.00
Jumlah Harga Bahan 21,346,272.06
Peralatan
9.1.2.09.03.01.001.00024 Crane Kapasitas ; 25 ton 0.500 Unit-Hari 3,000,000 1,500,000.00
Jumlah Harga Peralatan 1,500,000.00
Jumlah 22,846,272.06
Overhead & Profit 15 % 3,426,940.81

Nilai HSPK : 26,273,213.00


2.02.03.02.01.040 1 Unit Pengadaan dan Pemasangan Unit Nilai HSPK 54,412,669.00
RPPJ Portal Bentang 9 m' s/d 11 m' (dibulatkan) :

Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
1.1.7.02.02.07.001.00010 Pipa Galvanis Dia, 5inch. @6m 4.000 Batang 2,049,600 8,198,400.00
Medium A
1.1.7.02.02.07.001.00008 Pipa Galvanis Dia, 3inch. @6m 5.000 Batang 1,051,900 5,259,500.00
Medium A
1.1.7.02.02.07.001.00007 Pipa Galvanis Dia, 2-1/2inch. @6m 2.000 Batang 814,500 1,629,000.00
Medium A
1.3.2.18.01.01.003.00173 Daun RPPJ 120 x 240 m Dengan 1.000 Lembar 3,042,700 3,042,700.00
Reflektif Sheeting Tebal 2 mm
1.1.7.01.01.01.008.00008 Plat Tebal 10 mm 0.670 m2 2,440,500 1,635,135.00
1.1.7.01.01.01.008.00076 Angkur Dia. 18 dengan Mur Baut 16.000 Buah 77,950 1,247,200.00

2.01.01.07.03.005 Pekerjaan Pengelasan Tiang (1 titik ± 480.000 cm 5,137.00 2,465,760.00


10 cm)
2.01.01.07.03.005 Pekerjaan Pengelasan Brancing 300.000 cm 5,137.00 1,541,100.00
1.10.28.03.02.001.002 Pekerjaan Erection 1.000 Unit 4,383,700 4,383,700.00
2.01.01.01.02.004 Galian Tanah 3.000 m3 108,284.00 324,852.00
2.01.01.01.02.009 Tanah Urug 3.000 m3 59,225.00 177,675.00
2.01.01.01.02.015 Pemadatan Tanah 1.291 m3 59,225.00 76,483.17
2.01.01.01.02.020 Tanah Sirtu 0.320 m3 278,013.00 88,964.16
2.01.01.03.01.020 Pekerjaan Beton Bertulang untuk 1.760 m3 8,226,265.00 14,478,226.40
Pelat Beton
1.10.28.03.02.001.004 Pengecatan Pipa RPPJ Gapura 1.000 Unit 1,108,800 1,108,800.00
2.02.03.02.01.007 Ongkos Angkut ke Lokasi 1.000 Unit 1,657,868.00 1,657,868.00
Jumlah Harga Bahan 47,315,363.73
Peralatan
Jumlah Harga Peralatan
Jumlah 47,315,363.73
Overhead & Profit 15 % 7,097,304.56

Nilai HSPK : 54,412,669.00


2.02.03.02.01.041 1 Unit Pengadaan dan Pemasangan Unit Nilai HSPK 332,608,247.00
RPPJ Portal Bentang 18 m' (dibulatkan) :

Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
1.1.7.01.01.01.008.00039 Besi Siku L Uk. 30 x 30 x 3 60.800 Kg 13,350 811,680.00
1.1.7.01.01.01.008.00078 Angkur Dia. 22 mm Panjang 100 cm 12.000 Buah 98,400 1,180,800.00

1.1.7.01.01.01.022.00127 Mur Baut Pengaman 36.000 Buah 4,850 174,600.00


1.1.7.01.01.01.008.00082 Tutup Baut Angkur 12.000 Buah 18,600 223,200.00
1.1.7.01.01.01.022.00108 Rivet / Panel 18.000 Buah 7,950 143,100.00
1.1.7.01.01.01.022.00473 Klem 3x40x450 mm 6.000 Buah 17,450 104,700.00
1.1.7.01.01.01.022.00473 Klem 3x40x600 mm 6.000 Buah 17,450 104,700.00

237
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
1.1.7.01.01.01.022.00131 Baut/Mur dia. 22 mm untuk flange 96.000 Buah 12,000 1,152,000.00

1.1.7.01.01.01.022.00127 Mur Baut Pengaman 8.000 Buah 4,850 38,800.00


1.1.7.02.02.07.001.00339 Flange Pipa dia. 3inch. t=10 mm 8.000 Buah 161,100 1,288,800.00
1.1.7.02.02.07.001.00009 Pipa Galvanis Dia, 4inch. @6m 6.583 Ljr 1,522,950 10,025,579.85
Medium A
1.1.7.02.02.07.001.00011 Pipa Galvanis Dia, 6inch. @6m 3.167 Batang 2,440,050 7,726,906.34
Medium A
1.1.7.02.02.07.001.00013 Pipa Galvanis Dia. 12inch. @6m 14.000 m' 1,117,000.00 15,638,000.00
Medium A
1.1.7.02.02.07.001.00012 Pipa Galvanis Dia, 8inch. @6m 19.000 m' 4,325,900 82,192,100.00
Medium A
1.1.7.02.02.07.001.00341 Rib Plate Flange Pipa dia 3inch. t=10 12.000 Buah 19,000 228,000.00
mm
1.1.7.02.02.07.001.00343 Rib Plate Flange Pipa dia 6inch. t=6 54.000 Buah 146,800 7,927,200.00
mm
1.1.7.02.02.07.001.00344 Rib Plate Flange Pipa dia 8inch. t=6 54.000 Buah 43,400 2,343,600.00
mm
1.3.2.18.01.01.003.00171 Tutup Pipa dia. 12inch. 2.000 Buah 35,200 70,400.00
1.3.2.18.01.01.003.00169 Tutup Pipa 6inch. 2.000 Buah 20,900 41,800.00
1.3.2.18.01.01.003.00170 Tutup Pipa dia. 8inch. 2.000 Buah 24,700 49,400.00
1.1.7.02.02.07.001.00345 Base Plate (650x650x22 mm) 2.000 Buah 1,092,000 2,184,000.00
1.3.2.18.01.01.003.00173 Daun RPPJ 120 x 240 m Dengan 6.667 Lembar 3,042,700 20,284,768.09
Reflektif Sheeting Tebal 2 mm
1.1.7.01.03.09.006.00010 Logo Kementerian 4.000 Buah 19,300 77,200.00
1.3.2.18.01.01.003.00188 Delineator (Patok Pengaman) 6.000 Buah 362,300 2,173,800.00
2.01.01.01.02.001 Galian Tanah 1.120 m3 81,363.00 91,126.56
2.01.01.03.01.005 Cor Beton Pondasi ( 80 x 80 x 200 cm 1.280 m3 1,295,114.00 1,657,745.92
)
2.01.01.03.01.005 Cor Tiang Pancang Beton dia. 20 mm 0.240 m3 1,295,114.00 310,827.36

2.01.01.03.01.014 Pembesian 141.600 Kg 22,769.00 3,224,090.40


2.01.01.01.02.020 Tanah Sirtu 0.190 m3 278,013.00 52,822.47
2.02.03.02.01.001 Bekisting Pondasi 12.800 m3 82,735.00 1,059,008.00
2.01.01.07.03.001 Biaya pembuatan/ pengelasan 3,602.780 Kg 34,319.00 123,643,806.82
Jumlah Harga Bahan 286,224,561.81
Peralatan
9.1.2.09.03.01.001.00024 Crane Kapasitas ; 25 ton 1.000 Unit-Hari 3,000,000 3,000,000.00
Jumlah Harga Peralatan 3,000,000.00
Jumlah 289,224,561.81
Overhead & Profit 15 % 43,383,684.27

Nilai HSPK : 332,608,247.00


2.02.03.02.01.042 1 Unit Pengadaan dan Pemasangan Unit Nilai HSPK 228,848,850.00
ATCS ( Satu Simpang/ Simpang 3 ) (dibulatkan) :

Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
1.3.2.10.02.04.033.00049 Switch Hub 8 Port 1.000 Unit 3,261,500 3,261,500.00
1.3.2.10.02.04.033.00024 Kabel VGA 1.000 buah 323,300 323,300.00
1.3.2.10.02.04.033.00025 NVR 16 Channel 1.000 unit 7,052,800 7,052,800.00
1.3.2.10.02.04.033.00026 High Speed Wireless+Antena 5G30 2.000 set 9,638,800 19,277,600.00

1.3.2.10.02.04.033.00050 Konector RJ-45 20.000 Buah 1,386,000 27,720,000.00


1.3.2.10.02.04.033.00018 Kabel LAN STP CAT.5e 250.000 m 8,850 2,212,500.00
1.3.2.18.01.01.003.00213 Kontrolller Traffic Light ATCS dan Box 1.000 unit 53,639,500 53,639,500.00

1.3.2.18.01.01.003.00214 Set Program ATCS 1.000 set 8,301,400 8,301,400.00


1.3.2.10.02.04.033.00019 Conector amera 6.000 Buah 32,350 194,100.00
1.3.2.10.02.04.033.00027 HIK Vision DS-2AEI123TI PTZ 23x 1.000 unit 9,051,050 9,051,050.00
Zoom+Power Suply
1.3.2.10.02.04.033.00028 Camera Analog Samsung 2.000 unit 6,347,500 12,695,000.00
SCZ_2370+Housing+Powersuply

238
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
1.3.2.10.02.04.033.00029 DVR 4CH HIK Vision 2TB 1.000 unit 5,430,650 5,430,650.00
1.3.2.10.02.04.033.00030 Tiang Antena 21 meter (10,8,6,5,4) 1.000 set 43,492,050 43,492,050.00

1.3.2.10.02.04.033.00031 Grounding atau Penangkal Petir 1.000 unit 2,586,050 2,586,050.00


1.3.2.10.02.04.033.00032 Pemasangan Antena dan Set Up 2.000 set 1,880,750 3,761,500.00
Radio Link
Jumlah Harga Bahan 198,999,000.00
Peralatan
Jumlah Harga Peralatan
Jumlah 198,999,000.00
Overhead & Profit 15 % 29,849,850.00

Nilai HSPK : 228,848,850.00


2.02.03.02.01.043 1 Unit Pengadaan dan Pemasangan Unit Nilai HSPK 292,990,848.00
ATCS ( Satu Simpang/ Simpang 4 ) (dibulatkan) :

Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
1.3.2.10.02.04.033.00049 Switch Hub 8 Port 1.000 Unit 3,261,500 3,261,500.00
1.3.2.10.02.04.033.00024 Kabel VGA 1.000 buah 323,300 323,300.00
1.3.2.10.02.04.033.00033 Monitor LED 60inch. Untuk CCTV 1.000 buah 28,916,350 28,916,350.00
1.3.2.10.02.04.033.00034 Monitor LED 19inch. Untuk Monitor 1.000 buah 2,527,250 2,527,250.00
Control
1.3.2.10.02.04.033.00035 CPU Server CCTV 1.000 buah 15,281,000 15,281,000.00
1.3.2.10.02.04.033.00025 NVR 16 Channel 1.000 unit 7,052,800 7,052,800.00
1.3.2.10.02.04.033.00026 High Speed Wireless+Antena 5G30 2.000 set 9,638,800 19,277,600.00

1.3.2.10.02.04.033.00050 Konector RJ-45 20.000 Buah 1,386,000 27,720,000.00


1.3.2.10.02.04.033.00018 Kabel LAN STP CAT.5e 250.000 m 8,850 2,212,500.00
1.3.2.18.01.01.003.00213 Kontrolller Traffic Light ATCS dan Box 1.000 unit 53,639,500 53,639,500.00

1.3.2.18.01.01.003.00214 Set Program ATCS 1.000 set 8,301,400 8,301,400.00


1.3.2.10.02.04.033.00019 Conector Camera 6.000 Buah 32,350 194,100.00
1.3.2.10.02.04.033.00027 HIK Vision DS-2AEI123TI PTZ 23x 2.000 unit 9,051,050 18,102,100.00
Zoom+Power Suply
1.3.2.10.02.04.033.00028 Camera Analog Samsung 2.000 unit 6,347,500 12,695,000.00
SCZ_2370+Housing+Powersuply
1.3.2.10.02.04.033.00029 DVR 4CH HIK Vision 2TB 1.000 unit 5,430,650 5,430,650.00
1.3.2.10.02.04.033.00030 Tiang Antena 21 meter (10,8,6,5,4) 1.000 set 43,492,050 43,492,050.00

1.3.2.10.02.04.033.00031 Grounding atau Penangkal Petir 1.000 unit 2,586,050 2,586,050.00


1.3.2.10.02.04.033.00032 Pemasangan Antena dan Set Up 2.000 set 1,880,750 3,761,500.00
Radio Link
Jumlah Harga Bahan 254,774,650.00
Peralatan
Jumlah Harga Peralatan
Jumlah 254,774,650.00
Overhead & Profit 15 % 38,216,197.50

Nilai HSPK : 292,990,848.00


2.02.03.03 L. TAMAN & KEBERSIHAN
2.02.03.03.01 Taman
2.02.03.03.01.001 1 m3 Penyiapan Bibit Tanaman/ m3 Nilai HSPK 45,425.00
Pemutaran Tanaman (Vol 0.063 m3) (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.014 Tukang Taman 0.200 O.H 110,000 22,000.00
1.10.28.02.01.002.001 Pekerja 0.100 O.H 90,000 9,000.00
Jumlah Harga Tenaga Kerja 31,000.00
Bahan
1.1.7.01.01.01.020.00001 Glangsing 1.000 Buah 3,050 3,050.00
1.1.7.01.03.01.016.00018 Tali Rafia Bentul, 1 Kg 0.250 Roll 21,800 5,450.00
Jumlah Harga Bahan 8,500.00

239
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Peralatan
Jumlah Harga Peralatan
Jumlah 39,500.00
Overhead & Profit 15 % 5,925.00

Nilai HSPK : 45,425.00


2.02.03.03.01.002 1 m3 Tanah Taman (Terolah) m3 Nilai HSPK 77,453.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.010 O.H 130,000 1,300.00
1.10.28.02.01.002.001 Pekerja 0.250 O.H 90,000 22,500.00
Jumlah Harga Tenaga Kerja 23,800.00
Bahan
1.1.7.01.01.01.004.00007 Tanah Taman 0.250 Rit 174,200 43,550.00
Jumlah Harga Bahan 43,550.00
Peralatan
Jumlah Harga Peralatan
Jumlah 67,350.00
Overhead & Profit 15 % 10,102.50

Nilai HSPK : 77,453.00


2.02.03.03.01.003 Pengapuran dan Pengecatan 1 Batang Nilai HSPK 14,308.00
Batang Pohon (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.002 O.H 130,000 260.00
1.10.28.02.01.001.002 Kepala Tukang 0.006 O.H 120,000 708.00
1.10.28.02.01.001.005 Tukang Cat 0.059 O.H 110,000 6,435.00
Jumlah Harga Tenaga Kerja 7,403.00
Bahan
1.1.7.01.01.01.006.00015 Cat Tembok Paragon (5 Kg) 0.050 Galon 21,480 1,074.00
1.1.7.01.01.01.006.00013 Cat Kayu 0.050 Kg 72,000 3,600.00
1.1.7.01.01.01.006.00044 Minyak Cat Biasa 0.015 Liter 24,300 364.50
Jumlah Harga Bahan 5,038.50
Peralatan
Jumlah Harga Peralatan
Jumlah 12,441.50
Overhead & Profit 15 % 1,866.23

Nilai HSPK : 14,308.00


2.02.03.03.01.004 1 m2 Membabat/ Merapikan m2 Nilai HSPK 2,375.00
Rumput Tinggi < 20 cm (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.001 O.H 130,000 65.00
1.10.28.02.01.001.014 Tukang Taman 0.010 O.H 110,000 1,100.00
1.10.28.02.01.002.001 Pekerja 0.010 O.H 90,000 900.00
Jumlah Harga Tenaga Kerja 2,065.00
Bahan
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
Jumlah 2,065.00
Overhead & Profit 15 % 309.75

Nilai HSPK : 2,375.00


2.02.03.03.01.005 1 m2 Membabat/ Merapikan m2 Nilai HSPK 3,640.00
Rumput 20 cm < Tinggi < 50 cm (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.001 O.H 130,000 65.00
1.10.28.02.01.001.014 Tukang Taman 0.020 O.H 110,000 2,200.00
1.10.28.02.01.002.001 Pekerja 0.010 O.H 90,000 900.00
Jumlah Harga Tenaga Kerja 3,165.00
Bahan
Jumlah Harga Bahan

240
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Peralatan
Jumlah Harga Peralatan
Jumlah 3,165.00
Overhead & Profit 15 % 474.75

Nilai HSPK : 3,640.00


2.02.03.03.01.006 1 m2 Membabat/ Merapikan m2 Nilai HSPK 5,940.00
Rumput Tinggi > 50 cm Ringan (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.001 O.H 130,000 65.00
1.10.28.02.01.001.014 Tukang Taman 0.030 O.H 110,000 3,300.00
1.10.28.02.01.002.001 Pekerja 0.020 O.H 90,000 1,800.00
Jumlah Harga Tenaga Kerja 5,165.00
Bahan
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
Jumlah 5,165.00
Overhead & Profit 15 % 774.75

Nilai HSPK : 5,940.00


2.02.03.03.01.007 1 m2 Membabat/ Merapikan m2 Nilai HSPK 8,528.00
Rumput Tinggi > 50 cm Berat (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.001 O.H 130,000 65.00
1.10.28.02.01.001.014 Tukang Taman 0.030 O.H 110,000 3,300.00
1.10.28.02.01.002.001 Pekerja 0.045 O.H 90,000 4,050.00
Jumlah Harga Tenaga Kerja 7,415.00
Bahan
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
Jumlah 7,415.00
Overhead & Profit 15 % 1,112.25

Nilai HSPK : 8,528.00


2.02.03.03.01.008 1 m2 Menanam Rumput Manila m2 Nilai HSPK 54,453.00
Sistem Tandur (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.020 O.H 130,000 2,600.00
1.10.28.02.01.002.001 Pekerja 0.125 O.H 90,000 11,250.00
Jumlah Harga Tenaga Kerja 13,850.00
Bahan
1.3.5.05.01.01.006.00149 Rumput Manila Tandur / Zoysea 1.000 m2 33,500 33,500.00
Mayrella
Jumlah Harga Bahan 33,500.00
Peralatan
Jumlah Harga Peralatan
Jumlah 47,350.00
Overhead & Profit 15 % 7,102.50

Nilai HSPK : 54,453.00


2.02.03.03.01.009 1 m2 Menanam Rumput Lamur m2 Nilai HSPK 37,088.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.010 O.H 130,000 1,300.00
1.10.28.02.01.002.001 Pekerja 0.150 O.H 90,000 13,500.00
Jumlah Harga Tenaga Kerja 14,800.00
Bahan
1.3.5.05.01.01.006.00145 Rumput Lamur (Embun) / Polytrias 1.000 m2 17,450 17,450.00
Amaura 0
Jumlah Harga Bahan 17,450.00

241
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Peralatan
Jumlah Harga Peralatan
Jumlah 32,250.00
Overhead & Profit 15 % 4,837.50

Nilai HSPK : 37,088.00


2.02.03.03.01.010 1 m2 Mengolah Tanah (Mencangkul) m2 Nilai HSPK 13,174.00
Sedalam 30 cm (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.004 O.H 130,000 455.00
1.10.28.02.01.001.014 Tukang Taman 0.100 O.H 110,000 11,000.00
Jumlah Harga Tenaga Kerja 11,455.00
Bahan
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
Jumlah 11,455.00
Overhead & Profit 15 % 1,718.25

Nilai HSPK : 13,174.00


2.02.03.03.01.011 1 m2 Ongkos kerja Menanam m2 Nilai HSPK 13,398.00
Tanaman Pagar (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.005 O.H 130,000 650.00
1.10.28.02.01.001.014 Tukang Taman 0.100 O.H 110,000 11,000.00
Jumlah Harga Tenaga Kerja 11,650.00
Bahan
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
Jumlah 11,650.00
Overhead & Profit 15 % 1,747.50

Nilai HSPK : 13,398.00


2.02.03.03.01.012 1 Batang Penanaman Pohon Batang Nilai HSPK 217,213.00
Pelindung Mahoni t = 1.5 m (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.020 O.H 130,000 2,600.00
1.10.28.02.01.001.014 Tukang Taman 0.400 O.H 110,000 44,000.00
Jumlah Harga Tenaga Kerja 46,600.00
Bahan
1.3.5.05.01.01.009.00010 Mahoni Tinggi = 1.50 M 1.000 Batang 131,700 131,700.00
1.1.7.01.01.01.022.00469 Ajir Uk. 2 m 0.060 Batang 168,750 10,125.00
1.1.7.01.01.01.004.00007 Tanah Taman 0.003 Rit 174,200 435.50
1.1.7.01.01.12.001.00011 Pupuk Kandang 0.010 m3 2,000 20.00
Jumlah Harga Bahan 142,280.50
Peralatan
Jumlah Harga Peralatan
Jumlah 188,880.50
Overhead & Profit 15 % 28,332.08

Nilai HSPK : 217,213.00


2.02.03.03.01.013 1 m2 Ongkos Menanam Semak Hias m2 Nilai HSPK 44,735.00
(15 Batang) (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.020 O.H 130,000 2,600.00
1.10.28.02.01.001.014 Tukang Taman 0.330 O.H 110,000 36,300.00
Jumlah Harga Tenaga Kerja 38,900.00
Bahan
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
Jumlah 38,900.00

242
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Overhead & Profit 15 % 5,835.00

Nilai HSPK : 44,735.00


2.02.03.03.01.014 1 Batang Pemijahan Bibit Taman Batang Nilai HSPK 13,150.00
(Batang Pohon) (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.014 Tukang Taman 0.040 O.H 110,000 4,400.00
1.10.28.02.01.002.001 Pekerja 0.040 O.H 90,000 3,600.00
Jumlah Harga Tenaga Kerja 8,000.00
Bahan
1.1.7.01.01.01.004.00007 Tanah Taman 0.000 Rit 174,200 52.26
1.1.7.01.01.12.001.00011 Pupuk Kandang 0.001 m3 2,000 2.00
1.1.7.01.03.07.015.00004 Kantong plastik 12x24 cm 0.067 Lembar 50,700 3,380.00
Jumlah Harga Bahan 3,434.26
Peralatan
Jumlah Harga Peralatan
Jumlah 11,434.26
Overhead & Profit 15 % 1,715.14

Nilai HSPK : 13,150.00


2.02.03.03.01.015 1 Batang Penanaman Pohon Batang Nilai HSPK 217,788.00
Pelindung Tanjung t = 1.5 m (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.020 O.H 130,000 2,600.00
1.10.28.02.01.001.014 Tukang Taman 0.400 O.H 110,000 44,000.00
Jumlah Harga Tenaga Kerja 46,600.00
Bahan
1.3.5.05.01.01.006.00108 Tanjung / Mimusops Elengi Tinggi = 1.000 Batang 132,200 132,200.00
1,5 M
1.1.7.01.01.01.022.00469 Ajir Uk. 2 m 0.060 Batang 168,750 10,125.00
1.1.7.01.01.01.004.00007 Tanah Taman 0.003 Rit 174,200 435.50
1.1.7.01.01.12.001.00011 Pupuk Kandang 0.010 m3 2,000 20.00
Jumlah Harga Bahan 142,780.50
Peralatan
Jumlah Harga Peralatan
Jumlah 189,380.50
Overhead & Profit 15 % 28,407.08

Nilai HSPK : 217,788.00


2.02.03.03.01.016 1 Batang Penanaman Pohon Batang Nilai HSPK 179,263.00
Pelindung Spathodea t = 1.5 m (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.020 O.H 130,000 2,600.00
1.10.28.02.01.001.014 Tukang Taman 0.400 O.H 110,000 44,000.00
Jumlah Harga Tenaga Kerja 46,600.00
Bahan
1.3.5.05.01.01.006.00157 Spathodea / Spateodea Campanulata 1.000 Batang 98,700 98,700.00
Tinggi = 1,5 m
1.1.7.01.01.01.022.00469 Ajir Uk. 2 m 0.060 Batang 168,750 10,125.00
1.1.7.01.01.01.004.00007 Tanah Taman 0.003 Rit 174,200 435.50
1.1.7.01.01.12.001.00011 Pupuk Kandang 0.010 m3 2,000 20.00
Jumlah Harga Bahan 109,280.50
Peralatan
Jumlah Harga Peralatan
Jumlah 155,880.50
Overhead & Profit 15 % 23,382.08

Nilai HSPK : 179,263.00


2.02.03.03.01.017 1 Batang Penanaman Pohon Batang Nilai HSPK 315,596.00
Pelindung Sono t = 1.5 m (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.020 O.H 130,000 2,600.00
1.10.28.02.01.001.014 Tukang Taman 0.400 O.H 110,000 44,000.00

243
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Jumlah Harga Tenaga Kerja 46,600.00
Bahan
1.3.5.05.01.01.009.00018 Sono Keling Tinggi = 1,5 - 2 m 1.000 Batang 217,250 217,250.00
1.1.7.01.01.01.022.00469 Ajir Uk. 2 m 0.060 Batang 168,750 10,125.00
1.1.7.01.01.01.004.00007 Tanah Taman 0.003 Rit 174,200 435.50
1.1.7.01.01.12.001.00011 Pupuk Kandang 0.010 m3 2,000 20.00
Jumlah Harga Bahan 227,830.50
Peralatan
Jumlah Harga Peralatan
Jumlah 274,430.50
Overhead & Profit 15 % 41,164.58

Nilai HSPK : 315,596.00


2.02.03.03.01.018 1 Batang Penanaman Pohon Batang Nilai HSPK 180,758.00
Pelindung Bintaro t = 1.5 m (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.020 O.H 130,000 2,600.00
1.10.28.02.01.001.014 Tukang Taman 0.400 O.H 110,000 44,000.00
1.1.7.01.01.01.004.00007 Tanah Taman 0.003 Rit 174,200 435.50
Jumlah Harga Tenaga Kerja 47,035.50
Bahan
1.3.5.05.01.01.006.00240 Bintaro Tinggi = 2-3 m, Dia. 3-4 cm 1.000 Batang 100,000 100,000.00

1.1.7.01.01.01.022.00469 Ajir Uk. 2 m 0.060 Batang 168,750 10,125.00


1.1.7.01.01.12.001.00011 Pupuk Kandang 0.010 m3 2,000 20.00
Jumlah Harga Bahan 110,145.00
Peralatan
Jumlah Harga Peralatan
Jumlah 157,180.50
Overhead & Profit 15 % 23,577.08

Nilai HSPK : 180,758.00


2.02.03.03.01.019 Perawatan 1000 Batang Mangrove 1000 Batang Nilai HSPK 24,031,723.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.300 O.H 130,000 39,000.00
1.10.28.02.01.001.014 Tukang Taman 3.000 OH 110,000 330,000.00
Jumlah Harga Tenaga Kerja 369,000.00
Bahan
1.1.7.01.03.08.010.00004 Battery ABC, Besar 16.000 Buah 8,250 132,000.00
1.1.7.01.01.01.022.00469 Ajir Uk. 2 m 100.000 Batang 168,750 16,875,000.00
1.3.5.05.01.01.006.00366 Penggantian Tanaman 250.000 Batang 11,650 2,912,500.00
1.1.7.01.01.12.001.00009 Pupuk Daun @ 100 gr 12.000 Bungkus 6,600 79,200.00
Jumlah Harga Bahan 19,998,700.00
Peralatan
9.1.2.08.01.01.001.00012 Mobil Pick Up Dalam Kota 1.000 Hari 372,450 372,450.00
9.1.2.08.02.01.001.00001 Rakit 1.000 Hari 36,400 36,400.00
9.1.2.09.03.01.001.00065 Hand Sprayer 3.000 Hari 11,800 35,400.00
9.1.2.09.03.01.001.00059 Cutter 3.000 Buah 1,000 3,000.00
9.1.2.09.03.01.001.00073 Senter 3.000 Buah 27,400 82,200.00
Jumlah Harga Peralatan 529,450.00
Jumlah 20,897,150.00
Overhead & Profit 15 % 3,134,572.50

Nilai HSPK : 24,031,723.00


2.02.03.03.01.020 Penanaman 1000 Batang Mangrove 1000 Batang Nilai HSPK 35,383,481.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.800 O.H 130,000 104,000.00
1.10.28.02.01.001.014 Tukang Taman 8.000 O.H 110,000 880,000.00
Jumlah Harga Tenaga Kerja 984,000.00
Bahan
1.1.7.01.03.08.010.00001 Battery ABC, AAA isi 2 38.000 Buah 15,450 587,100.00
1.3.5.05.01.01.006.00366 Mangrove T. 1M 1,000.000 Batang 11,650 11,650,000.00

244
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
1.1.7.01.01.01.022.00469 Ajir Uk. 2 m 100.000 Batang 168,750 16,875,000.00
Jumlah Harga Bahan 29,112,100.00
Peralatan
9.1.2.09.03.01.001.00059 Cutter 8.000 Buah 1,000 8,000.00
9.1.2.09.03.01.001.00073 Senter 9.000 Buah 27,400 246,600.00
9.1.2.09.03.01.001.00069 Linggis 8.000 Buah 4,300 34,400.00
9.1.2.08.02.01.001.00001 Rakit 2.000 Hari 36,400 72,800.00
9.1.2.08.01.01.001.00001 Dump Truck 0.625 Jam 496,550 310,343.75
Jumlah Harga Peralatan 672,143.75
Jumlah 30,768,243.75
Overhead & Profit 15 % 4,615,236.56

Nilai HSPK : 35,383,481.00


2.02.03.03.01.021 Penanaman 1 Batang Mangrove Batang Nilai HSPK 20,989.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.001 O.H 130,000 104.00
1.10.28.02.01.001.014 Tukang Taman 0.008 O.H 110,000 880.00
Jumlah Harga Tenaga Kerja 984.00
Bahan
1.1.7.01.03.08.010.00001 Battery ABC, AAA isi 2 0.036 Buah 15,450 556.20
1.3.5.05.01.01.006.00366 Mangrove T. 1M 1.000 Batang 11,650 11,650.00
1.1.7.01.01.01.022.00469 Ajir Uk. 2 m 0.010 Batang 168,750 1,687.50
Jumlah Harga Bahan 13,893.70
Peralatan
9.1.2.08.01.01.001.00001 Dump Truck 0.007 Jam 496,550 3,227.58
9.1.2.08.02.01.001.00001 Rakit 0.002 Buah 36,400 72.80
9.1.2.08.02.01.001.00002 Sewa Perahu 0.002 Hari 36,400 72.80
Jumlah Harga Peralatan 3,373.18
Jumlah 18,250.88
Overhead & Profit 15 % 2,737.63

Nilai HSPK : 20,989.00


2.02.03.03.01.022 Perawatan 1 Batang Mangrove Batang Nilai HSPK 20,690.00
(Batang Pohon) (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.000 O.H 130,000 39.00
1.10.28.02.01.002.001 Pekerja 0.003 O.H 90,000 270.00
Jumlah Harga Tenaga Kerja 309.00
Bahan
1.1.7.01.03.08.010.00001 Battery ABC, AAA isi 2 0.016 Buah 15,450 247.20
1.1.7.01.01.01.022.00469 Ajir Uk. 2 m 0.100 Batang 168,750 16,875.00
1.1.7.01.01.12.001.00009 Pupuk Daun @ 100 gr 0.012 Kg 6,600 79.20
Jumlah Harga Bahan 17,201.40
Peralatan
9.1.2.08.01.01.001.00012 Mobil Pick Up Dalam Kota 0.001 Buah 372,450 372.45
9.1.2.08.02.01.001.00001 Rakit 0.001 Buah 36,400 36.40
9.1.2.09.03.01.001.00065 Hand Sprayer 0.003 Buah 11,800 35.40
9.1.2.08.02.01.001.00002 Sewa Perahu 0.001 Hari 36,400 36.40
Jumlah Harga Peralatan 480.65
Jumlah 17,991.05
Overhead & Profit 15 % 2,698.66

Nilai HSPK : 20,690.00


2.02.03.03.01.023 1 Batang Penanaman Pohon Semak Pohon Nilai HSPK 167,619.00
ex. Agave T = 1 m (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.020 O.H 130,000 2,600.00
1.10.28.02.01.001.014 Tukang Taman 0.400 O.H 110,000 44,000.00
Jumlah Harga Tenaga Kerja 46,600.00
Bahan
1.3.5.05.01.01.006.00001 Agave Putih Tinggi = 1 M 1.000 Batang 98,700 98,700.00
1.1.7.01.01.01.004.00007 Tanah Taman 0.003 Rit 174,200 435.50
1.1.7.01.01.12.001.00011 Pupuk Kandang 0.010 m3 2,000 20.00

245
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Jumlah Harga Bahan 99,155.50
Peralatan
Jumlah Harga Peralatan
Jumlah 145,755.50
Overhead & Profit 15 % 21,863.33

Nilai HSPK : 167,619.00


2.02.03.03.01.024 1 Batang Penanaman Pohon Semak Pohon Nilai HSPK 187,687.00
ex. Anglonema (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.020 O.H 130,000 2,600.00
1.10.28.02.01.001.014 Tukang Taman 0.400 O.H 110,000 44,000.00
Jumlah Harga Tenaga Kerja 46,600.00
Bahan
1.3.5.05.01.01.006.00135 Aglonema Sumatera 1.000 Batang 116,150 116,150.00
1.1.7.01.01.01.004.00007 Tanah Taman 0.003 Rit 174,200 435.50
1.1.7.01.01.12.001.00011 Pupuk Kandang 0.010 m3 2,000 20.00
Jumlah Harga Bahan 116,605.50
Peralatan
Jumlah Harga Peralatan
Jumlah 163,205.50
Overhead & Profit 15 % 24,480.83

Nilai HSPK : 187,687.00


2.02.03.03.01.025 1 Batang Penanaman Pohon Semak Pohon Nilai HSPK 127,599.00
ex. Bougenvile (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.020 O.H 130,000 2,600.00
1.10.28.02.01.001.014 Tukang Taman 0.400 O.H 110,000 44,000.00
Jumlah Harga Tenaga Kerja 46,600.00
Bahan
1.3.5.05.01.01.006.00014 Bougenville Pagar 0 1.000 Batang 63,900 63,900.00
1.1.7.01.01.01.004.00007 Tanah Taman 0.003 Rit 174,200 435.50
1.1.7.01.01.12.001.00011 Pupuk Kandang 0.010 m3 2,000 20.00
Jumlah Harga Bahan 64,355.50
Peralatan
Jumlah Harga Peralatan
Jumlah 110,955.50
Overhead & Profit 15 % 16,643.33

Nilai HSPK : 127,599.00


2.02.03.03.01.026 1 Batang Penanaman Pohon Semak Pohon Nilai HSPK 74,182.00
ex. Cendrawasih (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.020 O.H 130,000 2,600.00
1.10.28.02.01.001.014 Tukang Taman 0.400 O.H 110,000 44,000.00
Jumlah Harga Tenaga Kerja 46,600.00
Bahan
1.3.5.05.01.01.006.00182 Cendrawasih Tinggi = 10 cm 1.000 Batang 17,450 17,450.00
1.1.7.01.01.01.004.00007 Tanah Taman 0.003 Rit 174,200 435.50
1.1.7.01.01.12.001.00011 Pupuk Kandang 0.010 m3 2,000 20.00
Jumlah Harga Bahan 17,905.50
Peralatan
Jumlah Harga Peralatan
Jumlah 64,505.50
Overhead & Profit 15 % 9,675.83

Nilai HSPK : 74,182.00


2.02.03.03.01.027 1 Batang Penanaman Pohon Semak Pohon Nilai HSPK 94,192.00
ex. Drasena (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.020 O.H 130,000 2,600.00
1.10.28.02.01.001.014 Tukang Taman 0.400 O.H 110,000 44,000.00
Jumlah Harga Tenaga Kerja 46,600.00

246
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Bahan
1.3.5.05.01.01.006.00184 Drasena Hijau Tinggi = 30 cm 1.000 Pot 34,850 34,850.00
1.1.7.01.01.01.004.00007 Tanah Taman 0.003 Rit 174,200 435.50
1.1.7.01.01.12.001.00011 Pupuk Kandang 0.010 m3 2,000 20.00
Jumlah Harga Bahan 35,305.50
Peralatan
Jumlah Harga Peralatan
Jumlah 81,905.50
Overhead & Profit 15 % 12,285.83

Nilai HSPK : 94,192.00


2.02.03.03.01.028 1 Batang Penanaman Pohon Semak Pohon Nilai HSPK 105,979.00
ex. Elfak Merah (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.020 O.H 130,000 2,600.00
1.10.28.02.01.001.014 Tukang Taman 0.400 O.H 110,000 44,000.00
Jumlah Harga Tenaga Kerja 46,600.00
Bahan
1.3.5.05.01.01.006.00186 Elfak Merah 1.000 Pot 45,100 45,100.00
1.1.7.01.01.01.004.00007 Tanah Taman 0.003 Rit 174,200 435.50
1.1.7.01.01.12.001.00011 Pupuk Kandang 0.010 m3 2,000 20.00
Jumlah Harga Bahan 45,555.50
Peralatan
Jumlah Harga Peralatan
Jumlah 92,155.50
Overhead & Profit 15 % 13,823.33

Nilai HSPK : 105,979.00


2.02.03.03.01.029 1 Batang Penanaman Pohon Semak Pohon Nilai HSPK 1,122,292.00
ex. Tanaman Dolar, Tinggi 100 cm (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.020 O.H 130,000 2,600.00
1.10.28.02.01.001.014 Tukang Taman 0.400 O.H 110,000 44,000.00
Jumlah Harga Tenaga Kerja 46,600.00
Bahan
1.3.5.05.01.01.006.00305 Tanaman Dolar, Tinggi 100 cm 1.000 Batang 928,850 928,850.00
1.1.7.01.01.01.004.00007 Tanah Taman 0.003 Rit 174,200 435.50
1.1.7.01.01.12.001.00011 Pupuk Kandang 0.010 m3 2,000 20.00
Jumlah Harga Bahan 929,305.50
Peralatan
Jumlah Harga Peralatan
Jumlah 975,905.50
Overhead & Profit 15 % 146,385.83

Nilai HSPK : 1,122,292.00


2.02.03.03.01.030 1 Batang Penanaman Pohon Semak Pohon Nilai HSPK 174,289.00
ex.Pucuk Merah, Tinggi : 100-110 (dibulatkan) :
cm
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.020 O.H 130,000 2,600.00
1.10.28.02.01.001.014 Tukang Taman 0.400 O.H 110,000 44,000.00
Jumlah Harga Tenaga Kerja 46,600.00
Bahan
1.3.5.05.01.01.006.00430 Pucuk Merah, Tinggi : 100-110 cm 1.000 Batang 104,500 104,500.00

1.1.7.01.01.01.004.00007 Tanah Taman 0.003 Rit 174,200 435.50


1.1.7.01.01.12.001.00011 Pupuk Kandang 0.010 m3 2,000 20.00
Jumlah Harga Bahan 104,955.50
Peralatan
Jumlah Harga Peralatan
Jumlah 151,555.50
Overhead & Profit 15 % 22,733.33

247
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Nilai HSPK : 174,289.00
2.02.03.03.01.031 1 Batang Penanaman Pohon Semak Pohon Nilai HSPK 100,862.00
ex.Pagoda, Tinggi Batang : 100-120 (dibulatkan) :
cm
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.020 O.H 130,000 2,600.00
1.10.28.02.01.001.014 Tukang Taman 0.400 O.H 110,000 44,000.00
Jumlah Harga Tenaga Kerja 46,600.00
Bahan
1.3.5.05.01.01.006.00445 Pagoda, Tinggi Batang : 100-120 cm 1.000 Batang 40,650 40,650.00

1.1.7.01.01.01.004.00007 Tanah Taman 0.003 Rit 174,200 435.50


1.1.7.01.01.12.001.00011 Pupuk Kandang 0.010 m3 2,000 20.00
Jumlah Harga Bahan 41,105.50
Peralatan
Jumlah Harga Peralatan
Jumlah 87,705.50
Overhead & Profit 15 % 13,155.83

Nilai HSPK : 100,862.00


2.02.03.03.01.032 1 Batang Penanaman Pohon Semak Pohon Nilai HSPK 120,929.00
ex.Puring jet, Tinggi Batang : 40-50 (dibulatkan) :
cm
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.020 O.H 130,000 2,600.00
1.10.28.02.01.001.014 Tukang Taman 0.400 O.H 110,000 44,000.00
Jumlah Harga Tenaga Kerja 46,600.00
Bahan
1.3.5.05.01.01.006.00092 Puring jet, Tinggi Batang : 40-50 cm 1.000 Batang 58,100 58,100.00

1.1.7.01.01.01.004.00007 Tanah Taman 0.003 Rit 174,200 435.50


1.1.7.01.01.12.001.00011 Pupuk Kandang 0.010 m3 2,000 20.00
Jumlah Harga Bahan 58,555.50
Peralatan
Jumlah Harga Peralatan
Jumlah 105,155.50
Overhead & Profit 15 % 15,773.33

Nilai HSPK : 120,929.00


2.02.03.03.01.033 1 Batang Penanaman Pohon Semak Pohon Nilai HSPK 70,157.00
ex Rambusa Putih, Tinggi Batang : 40- (dibulatkan) :
50 cm
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.020 O.H 130,000 2,600.00
1.10.28.02.01.001.014 Tukang Taman 0.400 O.H 110,000 44,000.00
Jumlah Harga Tenaga Kerja 46,600.00
Bahan
1.3.5.05.01.01.006.00444 Rambusa Putih, Tinggi Batang : 40-50 1.000 Batang 13,950 13,950.00
cm
1.1.7.01.01.01.004.00007 Tanah Taman 0.003 Rit 174,200 435.50
1.1.7.01.01.12.001.00011 Pupuk Kandang 0.010 m3 2,000 20.00
Jumlah Harga Bahan 14,405.50
Peralatan
Jumlah Harga Peralatan
Jumlah 61,005.50
Overhead & Profit 15 % 9,150.83

Nilai HSPK : 70,157.00


2.02.03.03.01.034 1 Batang Penanaman Pohon Semak Pohon Nilai HSPK 67,512.00
ex.Andong, Tinggi Batang : 40-50 cm (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.020 O.H 130,000 2,600.00
1.10.28.02.01.001.014 Tukang Taman 0.400 O.H 110,000 44,000.00

248
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Jumlah Harga Tenaga Kerja 46,600.00
Bahan
1.3.5.05.01.01.006.00226 Andong, Tinggi Batang : 40-50 cm 1.000 Batang 11,650 11,650.00

1.1.7.01.01.01.004.00007 Tanah Taman 0.003 Rit 174,200 435.50


1.1.7.01.01.12.001.00011 Pupuk Kandang 0.010 m3 2,000 20.00
Jumlah Harga Bahan 12,105.50
Peralatan
Jumlah Harga Peralatan
Jumlah 58,705.50
Overhead & Profit 15 % 8,805.83

Nilai HSPK : 67,512.00


2.02.03.03.01.035 1 Batang Penanaman Pohon Semak Pohon Nilai HSPK 78,149.00
ex.Puring Bulan, Tinggi Batang : 40- (dibulatkan) :
50 cm
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.020 O.H 130,000 2,600.00
1.10.28.02.01.001.014 Tukang Taman 0.400 O.H 110,000 44,000.00
Jumlah Harga Tenaga Kerja 46,600.00
Bahan
1.3.5.05.01.01.006.00094 Puring Bulan, Tinggi Batang : 40-50 1.000 Batang 20,900 20,900.00
cm
1.1.7.01.01.01.004.00007 Tanah Taman 0.003 Rit 174,200 435.50
1.1.7.01.01.12.001.00011 Pupuk Kandang 0.010 m3 2,000 20.00
Jumlah Harga Bahan 21,355.50
Peralatan
Jumlah Harga Peralatan
Jumlah 67,955.50
Overhead & Profit 15 % 10,193.33

Nilai HSPK : 78,149.00


2.02.03.03.01.036 1 Batang Penanaman Pohon Semak Pohon Nilai HSPK 60,842.00
ex.Melati Costa, Tinggi Batang : 30- (dibulatkan) :
40 cm
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.020 O.H 130,000 2,600.00
1.10.28.02.01.001.014 Tukang Taman 0.400 O.H 110,000 44,000.00
Jumlah Harga Tenaga Kerja 46,600.00
Bahan
1.3.5.05.01.01.006.00258 Melati Costa, Tinggi Batang : 30-40 1.000 Batang 5,850 5,850.00
cm
1.1.7.01.01.01.004.00007 Tanah Taman 0.003 Rit 174,200 435.50
1.1.7.01.01.12.001.00011 Pupuk Kandang 0.010 m3 2,000 20.00
Jumlah Harga Bahan 6,305.50
Peralatan
Jumlah Harga Peralatan
Jumlah 52,905.50
Overhead & Profit 15 % 7,935.83

Nilai HSPK : 60,842.00


2.02.03.03.01.037 1 Batang Penanaman Pohon Semak Pohon Nilai HSPK 66,132.00
ex.Asoka, Tinggi Batang : 30-40 cm (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.020 O.H 130,000 2,600.00
1.10.28.02.01.001.014 Tukang Taman 0.400 O.H 110,000 44,000.00
Jumlah Harga Tenaga Kerja 46,600.00
Bahan
1.3.5.05.01.01.006.00229 Asoka, Tinggi Batang : 30-40 cm 1.000 Batang 10,450 10,450.00
1.1.7.01.01.01.004.00007 Tanah Taman 0.003 Rit 174,200 435.50
1.1.7.01.01.12.001.00011 Pupuk Kandang 0.010 m3 2,000 20.00
Jumlah Harga Bahan 10,905.50
Peralatan

249
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Jumlah Harga Peralatan
Jumlah 57,505.50
Overhead & Profit 15 % 8,625.83

Nilai HSPK : 66,132.00


2.02.03.03.01.038 1 Batang Penanaman Pohon Semak Pohon Nilai HSPK 70,157.00
ex.Pucuk Merah, Tinggi : 100-110 (dibulatkan) :
cm
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.020 O.H 130,000 2,600.00
1.10.28.02.01.001.014 Tukang Taman 0.400 O.H 110,000 44,000.00
Jumlah Harga Tenaga Kerja 46,600.00
Bahan
1.3.5.05.01.01.006.00446 Ararea, Tinggi Batang : 30-40 cm 1.000 Batang 13,950 13,950.00
1.1.7.01.01.01.004.00007 Tanah Taman 0.003 Rit 174,200 435.50
1.1.7.01.01.12.001.00011 Pupuk Kandang 0.010 m3 2,000 20.00
Jumlah Harga Bahan 14,405.50
Peralatan
Jumlah Harga Peralatan
Jumlah 61,005.50
Overhead & Profit 15 % 9,150.83

Nilai HSPK : 70,157.00


2.02.03.03.01.039 1 Batang Penanaman Pohon Semak Pohon Nilai HSPK 70,157.00
ex.Red Siping, Tinggi Batang : 30-40 (dibulatkan) :
cm
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.020 O.H 130,000 2,600.00
1.10.28.02.01.001.014 Tukang Taman 0.400 O.H 110,000 44,000.00
Jumlah Harga Tenaga Kerja 46,600.00
Bahan
1.3.5.05.01.01.006.00447 Red Siping, Tinggi Batang : 30-40 cm 1.000 Batang 13,950 13,950.00

1.1.7.01.01.01.004.00007 Tanah Taman 0.003 Rit 174,200 435.50


1.1.7.01.01.12.001.00011 Pupuk Kandang 0.010 m3 2,000 20.00
Jumlah Harga Bahan 14,405.50
Peralatan
Jumlah Harga Peralatan
Jumlah 61,005.50
Overhead & Profit 15 % 9,150.83

Nilai HSPK : 70,157.00


2.02.03.03.01.040 1 Batang Penanaman Pohon Semak Pohon Nilai HSPK 67,512.00
ex.Heloconia, Tinggi Batang : 30-40 (dibulatkan) :
cm
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.020 O.H 130,000 2,600.00
1.10.28.02.01.001.014 Tukang Taman 0.400 O.H 110,000 44,000.00
Jumlah Harga Tenaga Kerja 46,600.00
Bahan
1.3.5.05.01.01.006.00248 Heloconia, Tinggi Batang : 30-40 cm 1.000 Batang 11,650 11,650.00

1.1.7.01.01.01.004.00007 Tanah Taman 0.003 Rit 174,200 435.50


1.1.7.01.01.12.001.00011 Pupuk Kandang 0.010 m3 2,000 20.00
Jumlah Harga Bahan 12,105.50
Peralatan
Jumlah Harga Peralatan
Jumlah 58,705.50
Overhead & Profit 15 % 8,805.83

Nilai HSPK : 67,512.00


2.02.03.03.01.041 1 Batang Penanaman Pohon Semak Pohon Nilai HSPK 64,809.00
ex.Akalipa Green, Tinggi Batang : 30- (dibulatkan) :
40 cm

250
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.020 O.H 130,000 2,600.00
1.10.28.02.01.001.014 Tukang Taman 0.400 O.H 110,000 44,000.00
Jumlah Harga Tenaga Kerja 46,600.00
Bahan
1.3.5.05.01.01.006.00448 Akalipa Green, Tinggi Batang : 30-40 1.000 Batang 9,300 9,300.00
cm
1.1.7.01.01.01.004.00007 Tanah Taman 0.003 Rit 174,200 435.50
1.1.7.01.01.12.001.00011 Pupuk Kandang 0.010 m3 2,000 20.00
Jumlah Harga Bahan 9,755.50
Peralatan
Jumlah Harga Peralatan
Jumlah 56,355.50
Overhead & Profit 15 % 8,453.33

Nilai HSPK : 64,809.00


2.02.03.03.01.042 1 Batang Penanaman Pohon Semak Pohon Nilai HSPK 72,169.00
ex.Sepatu Prospek Varigata, Tinggi (dibulatkan) :
Batang : 30-40 cm

Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.020 O.H 130,000 2,600.00
1.10.28.02.01.001.014 Tukang Taman 0.400 O.H 110,000 44,000.00
Jumlah Harga Tenaga Kerja 46,600.00
Bahan
1.3.5.05.01.01.006.00449 Sepatu Prospek Varigata, Tinggi 1.000 Batang 15,700 15,700.00
Batang : 30-40 cm
1.1.7.01.01.01.004.00007 Tanah Taman 0.003 Rit 174,200 435.50
1.1.7.01.01.12.001.00011 Pupuk Kandang 0.010 m3 2,000 20.00
Jumlah Harga Bahan 16,155.50
Peralatan
Jumlah Harga Peralatan
Jumlah 62,755.50
Overhead & Profit 15 % 9,413.33

Nilai HSPK : 72,169.00


2.02.03.03.01.043 1 Batang Penanaman Pohon Semak Pohon Nilai HSPK 75,504.00
ex.Walisongo, Tinggi Batang : 30-40 (dibulatkan) :
cm
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.020 O.H 130,000 2,600.00
1.10.28.02.01.001.014 Tukang Taman 0.400 O.H 110,000 44,000.00
Jumlah Harga Tenaga Kerja 46,600.00
Bahan
1.3.5.05.01.01.006.00114 Walisongo, Tinggi Batang : 30-40 cm 1.000 Batang 18,600 18,600.00

1.1.7.01.01.01.004.00007 Tanah Taman 0.003 Rit 174,200 435.50


1.1.7.01.01.12.001.00011 Pupuk Kandang 0.010 m3 2,000 20.00
Jumlah Harga Bahan 19,055.50
Peralatan
Jumlah Harga Peralatan
Jumlah 65,655.50
Overhead & Profit 15 % 9,848.33

Nilai HSPK : 75,504.00


2.02.03.03.01.044 1 Batang Penanaman Pohon Semak Pohon Nilai HSPK 84,187.00
ex.Bakung Mas, Tinggi Batang : 30- (dibulatkan) :
40 cm
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.020 O.H 130,000 2,600.00
1.10.28.02.01.001.014 Tukang Taman 0.400 O.H 110,000 44,000.00
Jumlah Harga Tenaga Kerja 46,600.00
Bahan

251
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
1.3.5.05.01.01.006.00238 Bakung Mas, Tinggi Batang : 30-40 1.000 Batang 26,150 26,150.00
cm
1.1.7.01.01.01.004.00007 Tanah Taman 0.003 Rit 174,200 435.50
1.1.7.01.01.12.001.00011 Pupuk Kandang 0.010 m3 2,000 20.00
Jumlah Harga Bahan 26,605.50
Peralatan
Jumlah Harga Peralatan
Jumlah 73,205.50
Overhead & Profit 15 % 10,980.83

Nilai HSPK : 84,187.00


2.02.03.03.01.045 1 Batang Penanaman Pohon Semak Pohon Nilai HSPK 66,132.00
ex.Bakung Hijau, Panjang Daun : 20 (dibulatkan) :
cm
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.020 O.H 130,000 2,600.00
1.10.28.02.01.001.014 Tukang Taman 0.400 O.H 110,000 44,000.00
Jumlah Harga Tenaga Kerja 46,600.00
Bahan
1.3.5.05.01.01.006.00239 Bakung Hijau, Panjang Daun : 20 cm 1.000 Batang 10,450 10,450.00

1.1.7.01.01.01.004.00007 Tanah Taman 0.003 Rit 174,200 435.50


1.1.7.01.01.12.001.00011 Pupuk Kandang 0.010 m3 2,000 20.00
Jumlah Harga Bahan 10,905.50
Peralatan
Jumlah Harga Peralatan
Jumlah 57,505.50
Overhead & Profit 15 % 8,625.83

Nilai HSPK : 66,132.00


2.02.03.03.02 Pemeliharaan Taman
2.02.03.03.02.001 1 m2 Penyapuan Taman m2 Nilai HSPK 228.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.002.001 Pekerja 0.002 O.H 90,000 180.00
Jumlah Harga Tenaga Kerja 180.00
Bahan
1.1.7.01.03.09.003.00015 Seragam 0.000 Buah 106,100 10.61
1.1.7.01.01.01.020.00001 Glangsing 0.000 Buah 3,050 0.31
1.1.7.01.03.07.001.00005 Sapu Lidi Besar 0.000 Buah 25,100 2.51
1.1.7.01.03.07.004.00008 Sekrop Sampah Dengan Tangkai 0.000 Buah 44,650 4.47
Panjang
Jumlah Harga Bahan 17.89
Peralatan
Jumlah Harga Peralatan
Jumlah 197.89
Overhead & Profit 15 % 29.68

Nilai HSPK : 228.00


2.02.03.03.02.002 1 m2 Penyiraman Taman m2 Nilai HSPK -
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.014 Tukang Taman 0.000 O.H 110,000 22.00
1.10.28.02.01.002.001 Pekerja 0.001 O.H 90,000 117.00
Jumlah Harga Tenaga Kerja 139.00
Bahan
1.1.7.01.03.09.003.00015 Seragam 0.000 Buah 106,100 10.61
1.1.7.01.01.04.002.00001 Minyak Pelumas 0.000 Liter 43,000 4.30
1.1.7.01.01.04.001.00001 Bensin / Premium 0.000 Liter 7,650 0.77
Jumlah Harga Bahan 1,925,811.98
Peralatan
9.1.2.09.03.01.001.00047 Water Pump 70-100 ml 0.001 Jam 36,000 28.80
Jumlah Harga Peralatan 28.80
Jumlah -

252
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Overhead & Profit 15 % -

Nilai HSPK : -
2.02.03.03.02.003 1 m2 Pemotongan Rumput m2 Nilai HSPK -
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.014 Tukang Taman 0.002 O.H 110,000 220.00
Jumlah Harga Tenaga Kerja 220.00
Bahan
1.1.7.01.03.09.003.00015 Seragam 0.000 Buah 106,100 10.61
1.1.7.01.01.04.002.00001 Minyak Pelumas 0.000 Liter 43,000 4.30
1.1.7.01.01.04.001.00001 Bensin / Premium 0.000 Liter 7,650 0.77
1.1.7.01.01.01.020.00001 Glangsing 0.000 Buah 3,050 0.31
Jumlah Harga Bahan 906,116.64
Peralatan
9.1.2.09.03.01.001.00075 Mesin Pemotong Rumput Gendong 0.000 Hari 46,600 4.66
(Chainsaw)
Jumlah Harga Peralatan 4.66
Jumlah -
Overhead & Profit 15 % -

Nilai HSPK : -
2.02.03.03.02.004 1 m2 Pemangkasan Semak Hias m2 Nilai HSPK 331.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.014 Tukang Taman 0.003 O.H 110,000 275.00
Jumlah Harga Tenaga Kerja 275.00
Bahan
1.1.7.01.03.09.003.00015 Seragam 0.000 Buah 106,100 10.61
1.1.7.01.01.01.020.00001 Glangsing 0.000 Buah 3,050 0.31
Jumlah Harga Bahan 10.92
Peralatan
9.1.2.09.03.01.001.00072 Gunting Pangkas 0.000 Hari 12,450 1.25
Jumlah Harga Peralatan 1.25
Jumlah 287.16
Overhead & Profit 15 % 43.07

Nilai HSPK : 331.00


2.02.03.03.02.005 1 m2 Pemupukan, Pemberantasan m2 Nilai HSPK 1,115.00
Hama, dan Pendangiran (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.014 Tukang Taman 0.009 O.H 110,000 935.00
Jumlah Harga Tenaga Kerja 935.00
Bahan
1.1.7.01.03.09.003.00015 Seragam 0.000 Buah 106,100 10.61
1.1.7.01.01.12.001.00011 Pupuk Kandang 0.000 m3 2,000 0.20
1.1.7.01.01.12.001.00019 Pupuk NPK 0.000 Kg 15,000 6.00
1.1.7.01.04.02.001.00028 Obat Hama 0.000 Liter 175,800 17.58
Jumlah Harga Bahan 34.39
Peralatan
Jumlah Harga Peralatan
Jumlah 969.39
Overhead & Profit 15 % 145.41

Nilai HSPK : 1,115.00


2.02.03.03.02.006 1 m2 Angkut Sampah Taman m2 Nilai HSPK 205.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.016 Sopir 0.000 O.H 110,000 11.00
1.10.28.02.01.002.001 Pekerja 0.000 O.H 90,000 9.00
Jumlah Harga Tenaga Kerja 20.00
Bahan
1.1.7.01.01.04.001.00001 Bensin / Premium 0.001 Liter 7,650 8.42

253
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Jumlah Harga Bahan 8.42
Peralatan
9.1.2.08.01.01.001.00012 Mobil Pick Up Dalam Kota 0.000 Jam 372,450 148.98
Jumlah Harga Peralatan 148.98
Jumlah 177.40
Overhead & Profit 15 % 26.61

Nilai HSPK : 205.00


2.02.03.03.02.007 1 m2 Pemberantasan Hama m2 Nilai HSPK 115,221.00
Rayap/Termite Control (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.001 Mandor 0.015 O.H 130,000 1,950.00
1.10.28.02.01.001.018 Mekanik 0.035 O.H 100,000 3,500.00
1.10.28.02.01.002.001 Pekerja 0.350 O.H 90,000 31,500.00
Jumlah Harga Tenaga Kerja 36,950.00
Bahan
1.1.7.01.04.02.001.00042 Imidacloprid 200 gr 0.210 Liter 301,150.00 63,241.50
Jumlah Harga Bahan 63,241.50
Peralatan
Jumlah Harga Peralatan
Jumlah 100,191.50
Overhead & Profit 15 % 15,028.73

Nilai HSPK : 115,221.00


2.02.04 PERAWATAN KENDARAAN
2.02.04.01 M. SERVICE KENDARAAN
2.02.04.01.01 Service Ringan Truck Besar
2.02.04.01.01.001 Service Radiator Unit Nilai HSPK 678,500.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.002.001 Pembantu Mekanik 1.000 O.H 90,000 90,000.00
1.10.28.02.01.001.018 Mekanik 5.000 O.H 100,000 500,000.00
Jumlah Harga Tenaga Kerja 590,000.00
Bahan
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
Jumlah 590,000.00
Overhead & Profit 15 % 88,500.00

Nilai HSPK : 678,500.00


2.02.04.01.01.002 Tune Up (Tahun) Unit Nilai HSPK 2,645,000.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.018 Mekanik 23.000 O.H 100,000 2,300,000.00
Jumlah Harga Tenaga Kerja 2,300,000.00
Bahan
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
Jumlah 2,300,000.00
Overhead & Profit 15 % 345,000.00

Nilai HSPK : 2,645,000.00


2.02.04.01.01.003 Ganti Pangkon Mesin (Tahun) Unit Nilai HSPK 690,000.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.018 Mekanik 6.000 O.H 100,000 600,000.00
Jumlah Harga Tenaga Kerja 600,000.00
Bahan
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
Jumlah 600,000.00

254
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Overhead & Profit 15 % 90,000.00

Nilai HSPK : 690,000.00


2.02.04.01.01.004 Ganti Oli Lengkap (Tahun) Unit Nilai HSPK 1,092,500.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.018 Mekanik 9.500 O.H 100,000 950,000.00
Jumlah Harga Tenaga Kerja 950,000.00
Bahan
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
Jumlah 950,000.00
Overhead & Profit 15 % 142,500.00

Nilai HSPK : 1,092,500.00


2.02.04.01.01.005 Ganti / Penyetelan Nozzle Unit Nilai HSPK 95,841.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.018 Mekanik 0.833 O.H 100,000 83,340.00
Jumlah Harga Tenaga Kerja 83,340.00
Bahan
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
Jumlah 83,340.00
Overhead & Profit 15 % 12,501.00

Nilai HSPK : 95,841.00


2.02.04.01.01.006 Ganti Master Rem Set Unit Nilai HSPK 368,000.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.018 Mekanik 3.200 O.H 100,000 320,000.00
Jumlah Harga Tenaga Kerja 320,000.00
Bahan
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
Jumlah 320,000.00
Overhead & Profit 15 % 48,000.00

Nilai HSPK : 368,000.00


2.02.04.01.01.007 Ganti Master Kopling Set Unit Nilai HSPK 506,000.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.018 Mekanik 4.400 O.H 100,000 440,000.00
Jumlah Harga Tenaga Kerja 440,000.00
Bahan
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
Jumlah 440,000.00
Overhead & Profit 15 % 66,000.00

Nilai HSPK : 506,000.00


2.02.04.01.01.008 Ganti Cross Joint Unit Nilai HSPK 345,000.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.018 Mekanik 3.000 O.H 100,000 300,000.00
Jumlah Harga Tenaga Kerja 300,000.00
Bahan
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan

255
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Jumlah 300,000.00
Overhead & Profit 15 % 45,000.00

Nilai HSPK : 345,000.00


2.02.04.01.02 Service Sedang Truck Besar
2.02.04.01.02.001 Overhoul Master Rem dan Ganti Unit Nilai HSPK 1,495,000.00
Kampas Rem (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.018 Mekanik 13.000 O.H 100,000 1,300,000.00
Jumlah Harga Tenaga Kerja 1,300,000.00
Bahan
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
Jumlah 1,300,000.00
Overhead & Profit 15 % 195,000.00

Nilai HSPK : 1,495,000.00


2.02.04.01.02.002 Overhoul Master Kopling dan Ganti Unit Nilai HSPK 1,897,500.00
Kampas Kopling (Tahun) (dibulatkan) :

Tenaga Kerja
1.10.28.02.01.001.018 Mekanik 16.500 O.H 100,000 1,650,000.00
Jumlah Harga Tenaga Kerja 1,650,000.00
Bahan
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
Jumlah 1,650,000.00
Overhead & Profit 15 % 247,500.00

Nilai HSPK : 1,897,500.00


2.02.04.01.02.003 Ganti Bearing Roda Lengkap Depan Unit Nilai HSPK 3,680,000.00
& Belakang (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.018 Mekanik 32.000 O.H 100,000 3,200,000.00
Jumlah Harga Tenaga Kerja 3,200,000.00
Bahan
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
Jumlah 3,200,000.00
Overhead & Profit 15 % 480,000.00

Nilai HSPK : 3,680,000.00


2.02.04.01.02.004 Ganti Per Unit Nilai HSPK 2,185,000.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.018 Mekanik 19.000 O.H 100,000 1,900,000.00
Jumlah Harga Tenaga Kerja 1,900,000.00
Bahan
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
Jumlah 1,900,000.00
Overhead & Profit 15 % 285,000.00

Nilai HSPK : 2,185,000.00


2.02.04.01.02.005 Skur Klep Unit Nilai HSPK 1,035,000.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.018 Mekanik 9.000 O.H 100,000 900,000.00
Jumlah Harga Tenaga Kerja 900,000.00
Bahan

256
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
Jumlah 900,000.00
Overhead & Profit 15 % 135,000.00

Nilai HSPK : 1,035,000.00


2.02.04.01.03 Service Berat Truck Besar
2.02.04.01.03.001 Membongkar / Ganti Seker dan Ring Unit Nilai HSPK 5,232,500.00
Seker Set (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.018 Mekanik 45.500 O.H 100,000 4,550,000.00
Jumlah Harga Tenaga Kerja 4,550,000.00
Bahan
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
Jumlah 4,550,000.00
Overhead & Profit 15 % 682,500.00

Nilai HSPK : 5,232,500.00


2.02.04.01.03.002 Over Houl Set Unit Nilai HSPK 35,434,375.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.018 Mekanik 85.000 O.H 100,000 8,500,000.00
Jumlah Harga Tenaga Kerja 8,500,000.00
Bahan
1.10.28.02.01.001.020 Colter dan Kalibrasi 52.500 O.H 425,000 22,312,500.00
Jumlah Harga Bahan 22,312,500.00
Peralatan
Jumlah Harga Peralatan
Jumlah 30,812,500.00
Overhead & Profit 15 % 4,621,875.00

Nilai HSPK : 35,434,375.00


2.02.04.01.04 Service Ringan Buldoser
2.02.04.01.04.001 Service tiap 250 HM (Hour Machine) set Nilai HSPK 1,667,500.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.018 Mekanik 14.500 O.H 100,000 1,450,000.00
Jumlah Harga Tenaga Kerja 1,450,000.00
Bahan
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
Jumlah 1,450,000.00
Overhead & Profit 15 % 217,500.00

Nilai HSPK : 1,667,500.00


2.02.04.01.04.002 Service tiap 1000 HM (Hour set Nilai HSPK 2,185,000.00
Machine) (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.018 Mekanik 19.000 O.H 100,000 1,900,000.00
Jumlah Harga Tenaga Kerja 1,900,000.00
Bahan
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
Jumlah 1,900,000.00
Overhead & Profit 15 % 285,000.00

Nilai HSPK : 2,185,000.00


2.02.04.01.05 Service Ringan Eskavator

257
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f
2.02.04.01.05.001 Service tiap 250 HM (Hour Machine) set Nilai HSPK 1,667,500.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.018 Mekanik 14.500 O.H 100,000 1,450,000.00
Jumlah Harga Tenaga Kerja 1,450,000.00
Bahan
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
Jumlah 1,450,000.00
Overhead & Profit 15 % 217,500.00

Nilai HSPK : 1,667,500.00


2.02.04.01.05.002 Service tiap 500 HM (Hour Machine) set Nilai HSPK 1,955,000.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.018 Mekanik 17.000 O.H 100,000 1,700,000.00
Jumlah Harga Tenaga Kerja 1,700,000.00
Bahan
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
Jumlah 1,700,000.00
Overhead & Profit 15 % 255,000.00

Nilai HSPK : 1,955,000.00


2.02.04.01.05.003 Service tiap 1000 HM (Hour set Nilai HSPK 2,185,000.00
Machine) (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.018 Mekanik 19.000 O.H 100,000 1,900,000.00
Jumlah Harga Tenaga Kerja 1,900,000.00
Bahan
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
Jumlah 1,900,000.00
Overhead & Profit 15 % 285,000.00

Nilai HSPK : 2,185,000.00


2.02.04.01.05.004 Service tiap 2000 HM (Hour set Nilai HSPK 2,760,000.00
Machine) (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.018 Mekanik 24.000 O.H 100,000 2,400,000.00
Jumlah Harga Tenaga Kerja 2,400,000.00
Bahan
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
Jumlah 2,400,000.00
Overhead & Profit 15 % 360,000.00

Nilai HSPK : 2,760,000.00


2.02.04.01.06 Service Ringan Whell Loader
2.02.04.01.06.001 Service tiap 250 HM (Hour Machine) set Nilai HSPK 1,667,500.00
(dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.018 Mekanik 14.500 O.H 100,000 1,450,000.00
Jumlah Harga Tenaga Kerja 1,450,000.00
Bahan
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
Jumlah 1,450,000.00
Overhead & Profit 15 % 217,500.00

258
KODE URAIAN KOEF SAT HARGA SATUAN JUMLAH HARGA

a b c d e f

Nilai HSPK : 1,667,500.00


2.02.04.01.06.002 Service tiap 1000 HM (Hour set Nilai HSPK 2,185,000.00
Machine) (dibulatkan) :
Tenaga Kerja
1.10.28.02.01.001.018 Mekanik 19.000 O.H 100,000 1,900,000.00
Jumlah Harga Tenaga Kerja 1,900,000.00
Bahan
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
Jumlah 1,900,000.00
Overhead & Profit 15 % 285,000.00

Nilai HSPK : 2,185,000.00

259
PEMERINTAH KOTA

MOJOKERTO
2019

A S B FISIK

ANALISIS STANDAR BELANJA


(A S B )
ANALISIS STANDAR BELANJA (ASB) FISIK
PEMERINTAH KOTA MOJOKERTO TA 2019

KODE URAIAN KOEF SAT HARGA JUMLAH


SATUAN
a b c d f g
3.01 Asb Fisik
3.01.01 Pembangunan Gedung Negara, Rumah Negara, &
Pagar
3.01.01.01 Pembangunan Gedung Negara
3.01.01.01.01 Pembangunan Gedung Negara
3.01.01.01.01.001 1 M2 Pembangunan Gedung Negara Sederhana m2 Nilai Asb 4,853,513.00
(Dibulatkan):

2.01.01.01.02.001 Pekerjaan Galian Tanah Biasa Sedalam 1 Meter 0.4188 m3 81,363 34,076.74

2.01.01.01.02.019 Pekerjaan Pengurugan Pasir Urug 0.0262 m3 256,864 6,723.79


2.01.01.02.01.008 Pekerjaan Pemasangan Batu Kosong (Aanstamping) 0.0949 m3 582,558 55,286.35

2.01.01.02.01.002 Pekerjaan Pasangan Pondasi Batu Belah 15/20 Cm, 0.2876 m3 981,791 282,347.42
Campuran (1 Pc : 4 Pp)
2.01.01.01.02.009 Pekerjaan Pengurugan Kembali Galian Tanah Biasa 0.1051 m3 59,225 6,222.36
Sedalam 1 M
2.01.01.01.02.008 Pekerjaan Pembuangan Hasil Galian Sejauh 30 M 0.4087 m3 35,650 14,568.84

2.01.01.03.02.002 Bekisting Sloof Beton 0.2992 m2 376,251 112,559.12


2.01.01.03.01.014 Pekerjaan Pembesian Dengan Besi Ulir 3.0677 kg 22,769 69,848.40
2.01.01.03.01.013 Pekerjaan Pembesian Dengan Besi Polos 1.6070 kg 22,044 35,425.49
2.01.01.03.01.005 Beton Mutu FC = 14,5 Mpa (K 175), Slump (12+/-2) 0.0224 m3 1,295,114 29,058.44
Cm, W/C = 0,66
2.01.01.03.02.017 Pekerjaan Pasang Bekisting Untuk Kolom (3 Kali 0.3291 m2 202,826 66,745.20
Pakai)
2.01.01.03.01.014 Pekerjaan Pembesian Dengan Besi Ulir 3.5979 kg 22,769 81,920.03
2.01.01.03.01.013 Pekerjaan Pembesian Dengan Besi Polos 2.0772 kg 22,044 45,790.11
2.01.01.03.01.005 Beton Mutu FC = 14,5 Mpa (K 175), Slump (12+/-2) 0.0214 m3 1,295,114 27,702.38
Cm, W/C = 0,66
2.01.01.03.02.018 Pekerjaan Pasang Bekisting Untuk Balok (3 Kali 0.4065 m2 210,170 85,427.79
Pakai)
2.01.01.03.01.014 Pekerjaan Pembesian Dengan Besi Ulir 3.1744 kg 22,769 72,277.91
2.01.01.03.01.013 Pekerjaan Pembesian Dengan Besi Polos 2.0108 kg 22,044 44,326.08
2.01.01.03.01.005 Beton Mutu FC = 14,5 Mpa (K 175), Slump (12+/-2) 0.0303 m3 1,295,114 39,220.73
Cm, W/C = 0,66
2.01.01.03.02.005 Pekerjaan Pasang Bekisting Untuk Lantai 0.0126 m2 707,379 8,916.54
2.01.01.03.01.013 Pekerjaan Pembesian Dengan Besi Polos 0.2669 kg 22,044 5,882.95
2.01.01.03.01.005 Beton Mutu FC = 14,5 Mpa (K 175), Slump (12+/-2) 0.0014 m3 1,295,114 1,836.56
Cm, W/C = 0,66
2.01.01.01.02.019 Pekerjaan Pengurugan Pasir Urug 0.0744 m3 256,864 19,108.27
2.01.01.03.01.001 Pekerjaan Lantai Kerja K-100 FC = 7,4 Mpa Slump (3- 0.0318 m2 965,573 30,671.14
6) Cm, W/C = 0,87
2.01.01.05.01.004 Pekerjaan Pasangan Lantai Keramik Polos Uk.30X30 1.0227 m2 248,024 253,651.44
Cm
2.01.01.03.01.002 Beton Mutu FC = 7,4 Mpa (K 100), Slump (12+/-2) 0.2305 m2 1,195,547 275,626.83
Cm, W/C = 0,87
2.01.01.04.01.006 Pekerjaan Pemasangan Batu Merah Tebal 1/2 Bata 0.2797 m2 146,179 40,880.98
(1 Pc : 4 Ps)
2.01.01.04.01.004 Pekerjaan Pemasangan Batu Merah Tebal 1/2 Bata 0.0903 m2 149,691 13,522.51
(1 Pc : 3 Ps)
2.01.01.04.01.006 Pekerjaan Pemasangan Batu Merah Tebal 1/2 Bata 2.0345 m2 146,179 297,397.49
(1 Pc : 4 Ps)
2.01.01.06.04.010 Pekerjaan Pasang Dinding Pemisah Gypsum Rangkap 0.1197 m2 326,233 39,065.72
Rangka Kayu Kruing
2.01.01.04.01.006 Pekerjaan Pemasangan Batu Merah Tebal 1/2 Bata 0.0067 m3 146,179 982.59
(1 Pc : 4 Ps)
2.01.01.04.02.004 Pekerjaan Plesteran 1 Pc : 4 Ps Tebal 15 Mm 3.9795 m2 70,121 279,049.17

260
KODE URAIAN KOEF SAT HARGA JUMLAH
SATUAN
a b c d f g
2.01.01.07.03.011 Pasang Rangka Langit-Langit Hollow 40.40.2, Modul 1.4095 m2 98,821 139,287.78
60.60
2.01.01.07.01.041 Pekerjaan Langit - Langit Gypsum Board, (120X240) 1.4095 m2 55,188 77,787.25
Tebal 9 Mm
2.01.01.07.03.009 Pasang Rangka Atap Galvalume Untuk Genteng 1.6717 m2 259,380 433,608.71
Asbes/Spandex
2.01.01.07.01.002 Pekerjaan Pasang Atap Genteng Karang Pilang Ex. 1.6717 m2 163,806 273,836.49
Wisma
2.01.01.07.01.021 Pekerjaan Pasang Wuwung Genteng Karang Pilang 0.3162 m 137,185 43,374.67
Ex. Nglayur
2.01.01.06.03.014 Pekerjaan Pasang Listplank Kayu Kamper 3/20 0.4307 m 171,187 73,725.49
2.01.01.07.03.021 Pekerjaan Pasang Talang 1/2 Lingkaran D-15 Cm 0.1765 m 128,827 22,734.18
Seng Bjls 30 Lebar 45 Cm
2.01.01.07.02.001 Pekerjaan Pemasangan 1 Buah Kloset Duduk 0.0042 unit 2,556,945 10,743.47
2.01.01.07.02.002 Pekerjaan Pemasangan 1 Buah Kloset Jongkok 0.0084 unit 569,031 4,781.77
Porselen
2.01.01.07.02.010 Pekerjaan Pemasangan 1 Buah Floor Drain 0.0126 bh 35,938 453.00
2.01.01.07.02.020 Pekerjaan Pemasangan 1 Buah Kran Air dia. 3/4inch. 0.0126 bh 82,056 1,034.32
Atau 1/2inch.
2.01.01.07.02.006 Pekerjaan Pemasangan 1 Buah Bak Mandi Fiberglass 0.0042 bh 1,544,644 6,490.10

2.01.01.02.01.012 Pengeboran Sumur 0.1008 m1 58,167 5,865.58


2.01.01.07.02.027 Pipa Pvc Dia. 3inch. 0.1008 m1 711,259 71,723.60
2.01.01.07.02.025 Pipa Pvc Dia. 2inch. 0.0252 m1 391,787 9,876.98
2.01.01.07.02.022 Pipa Pvc Dia. 3/4inch. 0.1008 m1 120,700 12,171.43
1.02.09.01.61.031.006 Klep Diameter 3/4inch. 0.0042 bh 51,300 215.55

1.08.24.02.07.010.003 Stop Kran Dia. 1inch. 0.0042 bh 110,300 463.45

1.02.02.03.05.007.017 Mesin Jet Pump Kap.250 Watt 0.0042 bh 3,193,000 13,415.97

2.01.01.07.02.023 Pipa Pvc Dia. 1inch. 0.0504 m1 148,775 7,501.26


2.01.01.07.02.023 Pipa Pvc Dia. 1inch. 0.0336 m1 148,775 5,000.84
2.01.01.07.02.022 Pipa Pvc Dia. 3/4inch. 0.0168 m1 120,700 2,028.57
1.02.06.02.05.011.002 Tangki Air 500 Liter 0.0042 bh 11,302,950 47,491.39

2.01.01.07.03.002 Dudukan Tangki Air 0.0042 kg 32,732 137.53


1.08.24.02.07.010.003 Stop Kran Dia. 1inch. 0.0084 bh 110,300 926.89

1.08.24.02.07.010.003 Stop Kran Dia. 1inch. 0.0042 bh 110,300 463.45

1.08.24.02.07.010.003 Stop Kran Dia. 1inch. 0.0042 bh 110,300 463.45

2.01.01.07.02.025 Pekerjaan Pasang Pipa Pvc Type Aw dia. 2inch. 0.1681 m 391,787 65,846.55
2.01.01.07.02.023 Pekerjaan Pasang Pipa Pvc Type Aw dia. 1inch. 0.1471 m 148,775 21,878.68
2.01.01.07.02.022 Pekerjaan Pasang Pipa Pvc Type Aw dia. 3/4inch. 0.0336 m 120,700 4,057.14

2.01.01.07.02.028 Pekerjaan Pasang Pipa Pvc Type Aw dia. 4inch. 0.1681 m 1,024,088 172,115.63
2.01.01.07.02.027 Pekerjaan Pasang Pipa Pvc Type Aw dia. 3inch. 0.2668 m 711,259 189,768.68
2.01.01.07.02.025 Pekerjaan Pasang Pipa Pvc Type Aw dia. 2inch. 0.0378 m 391,787 14,815.47
2.01.01.01.02.001 Pekerjaan Galian Tanah Biasa Sedalam 1 Meter 0.0237 m3 81,363 1,924.68

2.01.01.01.02.019 Pekerjaan Pengurugan Pasir Urug 0.0005 m3 256,864 129.51


2.01.01.03.01.001 Pekerjaan Lantai Kerja K-100 FC = 7,4 Mpa Slump (3- 0.0158 m2 1,195,547 18,837.40
6) Cm, W/C = 0,87
2.01.01.03.02.005 Pekerjaan Pasang Bekisting Untuk Lantai 0.0882 m2 707,379 62,415.79
2.01.01.03.01.014 Pekerjaan Pembesian Dengan Besi Ulir 1.3235 kg 22,769 30,135.44
2.01.01.03.01.006 Beton Mutu FC = 16,9 Mpa (K 200), Slump (12+/-2) 0.0088 m3 1,327,090 11,709.62
Cm, W/C = 0,61
2.01.01.07.02.033 Septictank Pas. Bata Kap. 3,00 M3 + Rembesan 0.0042 bh 8,480,501 35,632.36
2.01.01.07.06.012 Pemasangan Box Panel 0.0042 unit 1,136,085 4,773.47
2.01.01.07.06.003 Pemasangan 1 Titik Lampu (Menggunakan Kabel 0.1555 ttk 297,218 46,206.16
Nym)

261
KODE URAIAN KOEF SAT HARGA JUMLAH
SATUAN
a b c d f g
2.01.01.07.06.001 Pemasangan 1 Titik Stop Kontak 0.0756 ttk 183,816 13,902.05
2.01.01.07.06.004 Pemasangan Saklar Tunggal Per Titik 0.0756 ttk 52,314 3,956.52
2.01.01.07.06.005 Pemasangan Saklar Ganda Per Titik 0.0798 ttk 57,489 4,589.46
2.01.01.07.06.001 Pemasangan 1 Titik Stop Kontak 0.0756 ttk 183,816 13,902.05
2.01.01.07.06.006 Pemasangan Lampu Tl 1 X 18 Watt (Lengkap) 0.0336 bh 259,095 8,709.08
2.01.01.07.06.007 Pemasangan Lampu Tl 1 X 36 Watt (Lengkap) 0.0336 bh 388,930 13,073.28
2.01.01.07.06.011 Pemasangan Lampu Down Light + Fitting 0.0882 bh 138,460 12,217.06
2.01.01.07.05.013 Pekerjaan Pengecatan Tembok Baru 1 Lapis Plamur, 3.9795 m2 18,180 72,348.00
1 Lapis Cat Dasar, 2 Lapis Cat Penutup Interior

2.01.01.05.01.006 Pekerjaan Pasangan Lantai Keramik Motif Uk.40X40 0.1529 m2 258,544 39,542.02
Cm
2.01.01.05.02.002 Pekerjaan Pasangan Dinding Keramik Polos 0.0387 m2 323,716 12,513.39
Uk.20X20 Cm
2.01.01.07.05.023 Pekerjaan Pengecatan Plafond 1.4095 m2 26,107 36,797.71
2.01.01.07.05.004 Pekerjaan Pengecatan Bidang Kayu Baru (1 Lapis 0.1981 m2 56,356 11,164.64
Plamir), 1 Lapis Cat Dasar 2 Lapis Cat Penutup

2.01.01.07.03.008 Alumunium Standart 3inch. Ca 0.6396 m1 220,274 140,882.81


2.01.01.07.03.007 Alumunium Standart 4inch. Ca 0.2004 m1 207,112 41,509.42
1.08.23.01.01.024.068 Karet Kusen 0.4823 m1 95,250 45,936.11

2.01.01.07.04.017 Kaca 5 Mm 0.1461 m2 171,957 25,114.39


2.01.01.07.04.019 Grendel 0.1218 set 48,128 5,864.34
2.01.01.07.04.010 Kait Angin 0.1261 set 45,529 5,738.95
1.08.23.01.01.065.055 Handle Pintu Type Hre 75.01 Ex Cisa 0.0210 bh 954,400 20,050.42

1.08.23.01.01.063.016 Selinder Cisa Type 08510 Ex Cisa 0.0168 bh 87,100 1,463.87

2.01.01.07.04.014 Door Stoper 0.0042 bh 44,850 188.45


2.01.01.07.04.011 Door Closer 0.0042 bh 266,731 1,120.72
2.01.01.07.04.012 Slot Tanam 0.0168 set 57,017 958.27

3.01.01.01.01.002 1 M2 Pembangunan Gedung Negara Tidak m2 Nilai Asb 5,755,928.00


Sederhana (Dibulatkan):

2.01.01.01.02.022 Pas. Urugan Tanah 1.1496 m3 208,840 240,090.16


2.01.01.01.02.001 Galian Tanah, Dalam S/D 1 M 0.0819 m3 81,363 6,660.20
2.01.01.01.02.019 Pas. Urugan Pasir 0.0165 m3 256,864 4,230.42
2.01.01.02.01.008 Aanstamping Batu Kali 0.1351 m3 582,558 78,690.03
2.01.01.02.01.002 Pas. Pondasi Batu Kali 1:4 0.0197 m3 1,015,938 20,030.00
2.01.01.03.01.001 Pas. Lantai Kerja Beton Tumbuk 1:3:5 0.0082 m2 965,573 7,951.25
2.01.01.03.02.002 Bekisting Sloof Beton 0.0920 m2 376,251 34,616.12
2.01.01.03.01.014 Tulangan Besi Beton U-39 2.5881 kg 22,769 58,927.96
2.01.01.03.01.014 Tulangan Besi Beton U-39 1.0531 kg 22,769 23,978.20
2.01.01.03.01.014 Tulangan Besi Beton U-24 0.1889 kg 22,769 4,301.34
2.01.01.03.01.008 Beton K - 250 0.0550 m3 1,367,411 75,208.84
2.01.01.03.02.002 Bekisting Sloof Beton 0.1649 m2 376,251 62,046.77
2.01.01.03.01.014 Tulangan Besi Beton U-39 2.5541 kg 22,769 58,153.45
2.01.01.03.01.014 Tulangan Besi Beton U-24 1.1515 kg 22,769 26,218.64
2.01.01.03.01.007 Beton K - 225 0.0294 m3 1,352,157 39,818.11
2.01.01.03.02.003 Bekisting Kolom Beton 0.1857 m2 608,479 112,981.31
2.01.01.03.01.014 Tulangan Besi Beton U-39 1.5637 kg 22,769 35,604.16
2.01.01.03.01.014 Tulangan Besi Beton U-39 0.2141 kg 22,769 4,873.98
2.01.01.03.01.014 Tulangan Besi Beton U-24 0.8250 kg 22,769 18,785.14
2.01.01.03.01.008 Beton K - 250 0.0145 m3 1,367,411 19,766.72
2.01.01.03.02.004 Bekisting Balok Beton 0.0054 m2 630,509 3,427.78
2.01.01.03.01.014 Tulangan Besi Beton U-39 0.0166 kg 22,769 377.83
2.01.01.03.01.014 Tulangan Besi Beton U-24 0.0258 kg 22,769 586.55
2.01.01.03.01.008 Beton K - 250 0.0005 m3 1,367,411 686.21
2.01.01.03.02.005 Bekisting Beton Plat Lantai 0.0337 m2 707,379 23,821.05
2.01.01.03.01.014 Tulangan Besi Beton U-39 0.2825 kg 22,769 6,432.51
2.01.01.03.01.014 Tulangan Besi Beton U-24 0.2595 kg 22,769 5,907.90
2.01.01.03.01.008 Beton K - 250 0.0054 m3 1,367,411 7,352.81

262
KODE URAIAN KOEF SAT HARGA JUMLAH
SATUAN
a b c d f g
2.01.01.03.02.004 Bekisting Balok Beton 0.2767 m2 630,509 174,451.93
2.01.01.03.01.014 Tulangan Besi Beton U-39 0.3618 kg 22,769 8,238.32
2.01.01.03.01.014 Tulangan Besi Beton U-39 3.6301 kg 22,769 82,652.89
2.01.01.03.01.014 Tulangan Besi Beton U-39 0.1417 kg 22,769 3,226.63
2.01.01.03.01.014 Tulangan Besi Beton U-24 1.4644 kg 22,769 33,343.23
2.01.01.03.01.008 Beton K - 250 0.0368 m3 1,367,411 50,322.22
2.01.01.03.02.005 Bekisting Beton Plat Lantai 0.0197 m2 707,379 13,903.63
2.01.01.03.01.014 Tulangan Besi Beton U-39 13.0116 kg 22,769 296,260.91
2.01.01.03.01.008 Beton K - 250 0.0878 m3 1,367,411 120,015.63
2.01.01.03.02.003 Bekisting Kolom Beton 0.1834 m2 608,479 111,624.18
2.01.01.03.01.014 Tulangan Besi Beton U-39 1.3135 kg 22,769 29,907.49
2.01.01.03.01.014 Tulangan Besi Beton U-39 0.2019 kg 22,769 4,596.90
2.01.01.03.01.014 Tulangan Besi Beton U-24 0.9465 kg 22,769 21,549.73
2.01.01.03.01.008 Beton K - 250 0.0156 m3 1,367,411 21,348.82
2.01.01.03.01.008 Beton K - 250 0.0165 m3 1,367,411 22,502.40
2.01.01.03.01.014 Tulangan Besi Beton U-39 1.5350 kg 22,769 34,951.41
2.01.01.03.01.014 Tulangan Besi Beton U-39 0.3590 kg 22,769 8,173.67
2.01.01.03.01.014 Tulangan Besi Beton U-24 0.9274 kg 22,769 21,115.69
2.01.01.03.02.022 Bekisting Praktis Beton 0.2068 m2 111,372 23,033.34
2.01.01.03.01.008 Beton K - 250 0.0723 m3 1,367,411 98,831.69
2.01.01.03.01.014 Tulangan Besi Beton U-24 6.5049 kg 22,769 148,109.75
2.01.01.03.02.012 Bekisting Beton Plat Lantai 0.4795 m2 353,690 169,603.52
2.01.01.01.02.019 Pas. Urugan Pasir 0.0612 m3 256,864 15,710.04
2.01.01.03.01.001 Pas. Lantai Kerja Beton Tumbuk 1:3:5 0.0306 m2 965,573 29,527.66
2.01.01.05.01.002 Pas. Lantai Granit Tile 400X400 0.0237 m2 558,589 13,237.26
2.01.01.05.01.002 Pas. Lantai Granit Tile 400X400 0.6562 m2 558,589 366,524.15
2.01.01.05.01.002 Pas. Lantai Granit Tile 400X400 0.0371 m2 558,589 20,720.20
2.01.01.05.01.002 Pas. Lantai Granit Tile 400X400 0.0257 m2 558,589 14,366.32
2.01.01.05.01.002 Pas. Lantai Granit Tile 400X400 0.4887 m2 558,589 272,960.08
2.01.01.05.02.009 Pas. Plint Granitetile 100X400 0.3793 m 77,470 29,384.54
2.01.01.04.01.013 Pas. Dinding Bata Beton Ringan; Ad 1:3 0.0487 m2 357,719 17,427.94
2.01.01.04.01.014 Pas. Dinding Bata Beton Ringan; Ad 1:4 0.6349 m2 357,719 227,105.22
2.01.01.04.02.004 Pas. Plester Acian; Ad. 1:4 0.0888 m2 70,121 6,228.46
2.01.01.04.02.004 Pas. Plester Acian; Ad. 1:4 1.2133 m2 70,121 85,076.73
2.01.01.05.02.002 Pas. Dinding Keramik 0.0223 m2 323,716 7,220.06
2.01.01.05.01.002 Pas. Dinding Granit Tile 400 X 400 0.0698 m2 558,589 39,010.98
2.01.01.06.04.010 Pas. Dinding Partisi Gypsumboard Rangka Kayu 0.0920 m2 448,130 41,229.18

2.01.01.04.01.002 Pas. Dinding Batu Bata; Ad 1:2 0.0695 m2 156,037 10,840.83


2.01.01.04.01.006 Pas. Dinding Batu Bata; Ad 1:4 0.9286 m2 146,179 135,736.57
2.01.01.04.02.004 Pas. Plester Acian; Ad. 1:4 0.0855 m2 70,121 5,998.75
2.01.01.04.02.004 Pas. Plester Acian; Ad. 1:4 1.7377 m2 70,121 121,846.74
2.01.01.05.02.002 Pas. Dinding Keramik 0.0404 m 323,716 13,086.36
2.01.01.05.01.002 Pas. Dinding Granit Tile 400 X 400 0.0790 m2 558,589 44,150.15
2.01.01.07.03.006 Pas. Dinding Partisi Gypsumboard Rangka Besi 0.0877 m2 200,967 17,621.07
Hollow
2.01.01.07.03.011 Pas. Rangka Plafond Besi Hollow 0.4780 m2 98,821 47,236.04
2.01.01.07.01.043 Pas. Penutup Plafond Gypsumboard T. 9 Mm 0.4780 m2 46,895 22,415.62
2.01.01.07.03.011 Pas. Rangka Plafond Besi Hollow 0.6817 m2 98,821 67,361.99
2.01.01.07.01.043 Pas. Penutup Plafond Gypsumboard T. 9 Mm 0.6817 m2 46,895 31,966.29
2.01.01.07.03.009 Rangka Atap Baja Ringan 0.8461 m2 259,380 219,464.40
2.01.01.07.01.005 Penutup Atap Genteng Keramik Glazur 0.8461 m2 258,952 219,102.26
2.01.01.07.01.022 Bubungan Genteng Keramik Glazur 0.1561 m 257,360 40,180.55
2.01.01.07.03.021 Pas. Talang Seng Plat 0.0641 m 128,827 8,260.79
2.01.01.06.03.013 Pas. Lisplank Kayu 3/20 Mm 0.1722 m 287,181 49,440.11
2.01.01.07.03.008 Kusen 3 0.7364 unit 220,274 162,200.17
2.01.01.07.03.007 Kusen 4 0.0234 unit 207,112 4,850.33
2.01.01.07.04.018 Kaca 8 Mm 0.1133 unit 264,017 29,921.22
2.01.01.07.04.019 Grendel 0.1004 unit 48,128 4,830.44
2.01.01.07.04.010 Kait Angin 0.1004 unit 45,529 4,569.59
2.01.01.07.04.005 Engsel 4inch. 0.0251 unit 42,785 1,073.55
1.08.23.01.01.065.055 Handle Pintu Type Hre 75.01 Ex Cisa 0.0070 unit 954,400 6,652.08

263
KODE URAIAN KOEF SAT HARGA JUMLAH
SATUAN
a b c d f g
1.08.23.01.01.063.016 Selinder Cisa Type 08510 Ex Cisa 0.0070 unit 87,100 607.08

2.01.01.07.04.014 Door Stoper 0.0070 unit 44,850 312.60


2.01.01.07.04.011 Door Closer 0.0070 unit 266,731 1,859.09
2.01.01.07.04.001 Slot Tanam Pintu Doble 0.0014 unit 257,761 359.31
2.01.01.07.04.012 Slot Tanam 0.0056 unit 57,017 317.92
2.01.01.07.02.001 Pas. Kloset Duduk Keramik 0.0056 unit 2,556,945 14,257.33
2.01.01.07.02.004 Pas. Urinoir Keramik 0.0028 umit 2,866,576 7,991.90
2.01.01.07.02.010 Pas. Floor Drain 0.0098 bh 35,938 350.68
2.01.01.07.02.020 Pas. Kran Dinding 0.0056 bh 82,056 457.54
2.01.01.07.02.035 Pas. Meja Pantry Uk. 600X 1500 Mm 0.0014 unit 1,581,289 2,204.29
2.01.01.07.02.001 Pas. Kloset Duduk Keramik 0.0028 unit 2,556,945 7,128.66
2.01.01.07.02.002 Pas. Kloset Jongkok Keramik 0.0028 bh 569,031 1,586.44
2.01.01.07.02.010 Pas. Floor Drain 0.0084 bh 35,938 300.58
2.01.01.07.02.020 Pas. Kran Dinding 0.0139 bh 82,056 1,143.84
2.01.01.02.01.012 Pengeboran Sumur 0.0502 m1 58,167 2,919.01
2.01.01.07.02.027 Pipa Pvc Dia. 3inch. 0.0390 m1 711,259 27,761.48
2.01.01.07.02.025 Pipa Pvc Dia. 2inch. 0.0112 m1 391,787 4,369.15
2.01.01.07.02.022 Pipa Pvc Dia. 3/4inch. 0.0892 m1 120,700 10,768.22
1.02.09.01.61.031.006 Klep Diameter 3/4inch. 0.0014 bh 51,300 71.51

1.08.24.02.07.010.003 Stop Kran Dia. 1inch. 0.0014 bh 110,300 153.76

1.02.02.03.05.007.017 Mesin Jet Pump Kap.250 Watt 0.0014 m1 3,193,000 4,450.98

2.01.01.07.02.023 Pipa Pvc Dia. 1inch. 0.0167 m1 148,775 2,488.67


2.01.01.07.02.023 Pipa Pvc Dia. 1inch. 0.0112 m1 148,775 1,659.12
2.01.01.07.02.022 Pipa Pvc Dia. 3/4inch. 0.0056 m1 120,700 673.01
1.02.06.02.05.011.004 Tangki Air 1000 Liter 0.0014 bh 98,250 136.96

2.01.01.07.03.002 Dudukan Tangki Air 0.0014 kg 32,732 45.63


1.08.24.02.07.010.003 Stop Kran Dia. 1inch. 0.0028 bh 110,300 307.51

1.08.24.02.07.010.003 Stop Kran Dia. 1inch. 0.0014 bh 110,300 153.76

1.08.24.02.07.010.003 Stop Kran Dia. 1inch. 0.0014 bh 110,300 153.76

2.01.01.01.02.001 Galian Tanah, Dalam S/D 1 M 0.0078 m3 81,363 638.55


2.01.01.01.02.019 Pas. Urugan Pasir 0.0002 m3 256,864 42.97
2.01.01.03.01.001 Pas. Lantai Kerja Beton Tumbuk 1:3:5 0.0052 m2 965,573 5,047.46
2.01.01.03.02.012 Bekisting Beton Plat Lantai 0.0293 m2 353,690 10,353.78
2.01.01.03.01.014 Tulangan Besi Beton U-24 0.4391 kg 22,769 9,997.96
2.01.01.03.01.006 Beton K - 200 0.0029 m3 1,327,090 3,884.87
2.01.01.07.02.025 Pipa Pvc Dia. 2inch. 0.0627 m 391,787 24,576.46
2.01.01.07.02.023 Pipa Pvc Dia. 1inch. 0.0516 m 148,775 7,673.41
2.01.01.07.02.022 Pipa Pvc Dia. 3/4inch. 0.0139 m 120,700 1,682.53
2.01.01.07.02.027 Pipa Pvc Dia. 3inch. 0.0084 m 711,259 5,948.89
2.01.01.07.02.028 Pipa Pvc Dia. 4inch. 0.0167 m 1,024,088 17,130.71
2.01.01.07.02.027 Pipa Pvc Dia. 3inch. 0.0669 m 711,259 47,591.11
2.01.01.07.02.028 Pipa Pvc Dia. 4inch. 0.1045 m 1,024,088 107,066.93
2.01.01.07.02.023 Pipa Pvc Dia. 1inch. 0.0627 m 148,775 9,332.53
2.01.01.07.02.022 Pipa Pvc Dia. 3/4inch. 0.0390 m 120,700 4,711.10
2.01.01.07.02.027 Pipa Pvc Dia. 3inch. 0.0042 m 711,259 2,974.44
2.01.01.07.02.028 Pipa Pvc Dia. 4inch. 0.0627 m 1,024,088 64,240.16
2.01.01.07.02.027 Pipa Pvc Dia. 3inch. 0.0390 m 711,259 27,761.48
2.01.01.07.02.034 Septictank Pas. Bata + Rembesan Kap. 6,00 M3 0.0028 unit 10,645,994 29,680.62
2.01.01.07.06.012 Pas. Box Panel 0.0014 unit 1,136,085 1,583.68
2.01.01.07.06.003 Pas. Instalasi Lampu 0.0599 ttk 297,218 17,815.60
2.01.01.07.06.001 Pas. Instalasi Stop Kontak 0.0195 ttk 183,816 3,587.30
2.01.01.07.06.004 Pas. Saklar Engkel 0.0599 ttk 52,314 3,135.76
2.01.01.07.06.001 Pemasangan 1 Titik Stop Kontak 0.0195 ttk 183,816 3,587.30
2.01.01.07.06.007 Pas. Lampu Tl 2 X 36 Watt Grille 0.0181 bh 388,930 7,048.09
2.01.01.07.06.011 Pas. Down Light & Plc 13 W 0.0335 bh 138,460 4,632.25
2.01.01.07.06.012 Pas. Box Panel 0.0014 m 1,136,085 1,583.68

264
KODE URAIAN KOEF SAT HARGA JUMLAH
SATUAN
a b c d f g
2.01.01.07.06.003 Pas. Instalasi Lampu 0.0418 ttk 297,218 12,429.49
2.01.01.07.06.001 Pas. Instalasi Stop Kontak 0.0209 ttk 183,816 3,843.54
2.01.01.07.06.004 Pas. Saklar Engkel 0.0418 ttk 52,314 2,187.74
2.01.01.07.06.001 Pemasangan 1 Titik Stop Kontak 0.1045 ttk 183,816 19,217.70
2.01.01.07.06.007 Pas. Lampu Tl 2 X 36 Watt Grille 0.0251 bh 388,930 9,758.90
2.01.01.07.06.011 Pas. Down Light & Plc 13 W 0.0376 bh 138,460 5,211.29
2.01.01.07.05.015 Cat Dinding Dalam Acrylic Emulsion Kw.I 1.2133 m2 73,491 89,165.50
2.01.01.07.05.015 Cat Dinding Dalam Acrylic Emulsion Kw.I 1.7377 m2 73,491 127,702.66
2.01.01.07.05.023 Cat Plafond Acrylic Emulsion Kw.I 0.4780 m2 26,107 12,479.04
2.01.01.07.05.023 Cat Plafond Acrylic Emulsion Kw.I 0.6817 m2 26,107 17,796.01
2.01.01.07.03.029 Railing Tangga Besi Hollow 0.0139 m 287,830 4,012.29

3.01.02.04 Non Konstruksi


3.01.02.04.01 Dinas Perhubungan
3.01.02.04.01.001 Pembangunan Halte / Shelter Angkutan Umum ( m2 Nilai Asb 10,733,633.00
1,80 X 6,50 ) (Dibulatkan):

2.01.01.01.01.004 Pasang Bouwplank 1.196581197 m 165,105 197,561.54


2.01.01.01.02.001 Galian Tanah Biasa 0.273504274 m3 81,363 22,253.13
2.01.01.01.02.009 Urugan Tanah Kembali 0.273504274 m3 59,225 16,198.29
2.01.01.01.02.019 Urugan Pasir Bawah Pondasi/Lantai 0.090940171 m3 256,864 23,359.26
2.01.01.03.01.016 Pek. Beton Bertulang, Pondasi Plat 60.60.25 0.023076923 m3 5,173,939 119,398.59
2.01.01.03.01.018 Pek. Beton Bertulang, Kolom Pandestal 30/30 0.011538462 m3 11,242,000 129,715.38
2.01.01.03.01.017 Pek. Beton Bertulang, Sloof 20/30 0.123076923 m3 6,421,166 790,297.35
2.01.01.03.01.001 Rabat Beton, 5 Cm 0.021367521 m3 965,573 20,631.90
2.01.01.03.01.020 Pek. Beton Bertulang, Pelat Beton 0.108974359 m3 8,226,265 896,451.96
2.01.01.04.01.004 Pas. Bata 1 Pc : 3 Psr 0.284615385 m2 149,691 42,604.36
2.01.01.04.02.003 Pas. Plesteran 1 Pc : 3 Psr 0.47008547 m2 72,161 33,921.84
2.01.01.05.01.007 Pas. Lantai Keramik 30X30, Motif 0.897435897 m2 258,870 232,319.23
2.01.01.07.03.030 Pas. Penutup Atap Polycarbonat 0.811965812 m2 265,682 215,724.70
2.02.03.02.01.029 Pas. Papan Rute Angkutan 0.241025641 m2 2,336,163 563,075.18
2.01.01.07.02.016 Pas. Pipa Baja Galvanis 1,25 inch. 3.917948718 m1 740,951 2,903,008.02
2.01.01.07.02.017 Pas. Pipa Baja Galvanis 1,5 inch. 3.227350427 m1 877,286 2,831,309.35
2.01.01.07.02.019 Pas. Pipa Baja Galvanis 4 inch. 0.512820513 m1 2,450,304 1,256,566.15
1.08.23.01.01.008.091 Besi Pelat 4inch. X 8inch. 2.173846154 kg 77,800 169,125.23

1.08.23.01.01.008.196 Angkur Baja Dia. 10 Mm 1.025641026 bh 112,650 115,538.46

2.01.01.07.03.005 Pengelasan 8.547008547 cm 5,137 43,905.98


2.01.01.07.05.018 Pengecatan Baja 1.538461538 m2 71,933 110,666.15

3.01.02.04.02 Dinas Lingkungan Hidup


3.01.02.04.02.002 Pemasangan Pju Cabang 2_Lampu Hps 250W/220V unit Nilai Asb 31,990,370.00
( Tiang Galvanish Oktagonal 9 M, Lengkap Mcb, (Dibulatkan):
Sistem Flenders Serta Pengecatan Tiang Dan
Ornamen Lengkap Dengan Asesorisnya )_Cabang 2

2.02.03.01.03.016 Pembuatan Dan Pemasangan Tiang Galvanish 1.0000 titik 8,224,455 8,224,455.00
Oktagonal 9 M Lengkap Mcb, Sistem Flenders Serta
Pengecatan Tiang Dan Ornamen
2.02.03.01.01.018 Instalasi 1 Titik Lampu Pju (Tarikan Udara) 13 M 1.0000 titik 184,949 184,949.00
Untuk Instalasi Dalam Tiang
2.02.03.01.03.001 Pengecatan Tiang Pju + Aksesoris Dan Ornamen 1.0000 bh 197,980 197,980.00

2.02.03.01.02.019 Pemasangan Dan Penarikan Kabel Twisted 2X10 Mm 7.0000 m1 15,612 109,284.00
(Dari Pln Ke Box Meter)
2.02.03.01.03.028 Pemasangan Lampu Hps 250W/220V Lengkap 2.0000 bh 6,404,580 12,809,160.00
Armateur, Balast, Ignitor & Capasitor
1.08.23.03.07.006.009 Pembuatan Dan Pemasangan Logo Pemkot (2 Sisi 1.0000 bh 57,950 57,950.00
Bolak-Balik)
1.02.06.03.06.999.017 Pemasangan Grounding Pada Masing-Masing Tiang 1.0000 titik 1,663,750 1,663,750.00
Octagonal

265
KODE URAIAN KOEF SAT HARGA JUMLAH
SATUAN
a b c d f g
2.02.03.01.01.028 Pemasangan Panel Lampu Pju 1 Phase Daya 4400 0.1000 set 5,385,680 538,568.00
Watt
2.02.03.01.02.005 Pemasangan Dan Penarikan Kabel Nyfgby 4X6 Mm 39.4197 m1 122,062 4,811,652.88
Untuk Instalasi Antar Tiang Pju
2.02.03.01.01.008 Pemasangan Pipa Pvc 2inch. Untuk Pelindung Kabel 39.4197 m1 86,064 3,392,620.91
Nyfgby 4X6 Mm

3.01.02.04.02.003 Pemasangan Pju Cabang 1_Lampu Hps 250W/220V unit Nilai Asb 24,352,070.00
( Tiang Galvanish Oktagonal 9 M, Lengkap Mcb, (Dibulatkan):
Sistem Flenders Serta Pengecatan Tiang Dan
Ornamen )
2.02.03.01.03.015 Pembuatan Dan Pemasangan Tiang Galvanish 1.0000 titik 6,990,735 6,990,735.00
Oktagonal 9 M Lengkap Mcb
Lengkap Mcb, Sistem Flenders Serta Pengecatan
Tiang Dan Ornamen
2.02.03.01.01.018 Instalasi 1 Titik Lampu Pju (Tarikan Udara) 13 M 1.0000 titik 184,949 184,949.00
Untuk Instalasi Dalam Tiang
2.02.03.01.03.001 Pengecatan Tiang Pju + Aksesoris Dan Ornamen 1.0000 bh 197,980 197,980.00

2.02.03.01.02.019 Pemasangan Dan Penarikan Kabel Twisted 2X10 Mm 7.0000 m1 15,612 109,284.00
(Dari Pln Ke Box Meter)
2.02.03.01.03.028 Pemasangan Lampu Hps 250W/220V Lengkap 1.0000 bh 6,404,580 6,404,580.00
Armateur, Balast, Ignitor & Capasitor
1.08.23.03.07.006.009 Pembuatan Dan Pemasangan Logo Pemkot (2 Sisi 1.0000 bh 57,950 57,950.00
Bolak-Balik)
1.02.06.03.06.999.017 Pemasangan Grounding Pada Masing-Masing Tiang 1.0000 titik 1,663,750 1,663,750.00
Octagonal
2.02.03.01.01.028 Pemasangan Panel Lampu Pju 1 Phase Daya 4400 0.1000 set 5,385,680 538,568.00
Watt
2.02.03.01.02.005 Pemasangan Dan Penarikan Kabel Nyfgby 4X6 Mm 39.4197 m1 122,062 4,811,652.88
Untuk Instalasi Antar Tiang Pju
2.02.03.01.01.008 Pemasangan Pipa Pvc 2inch. Untuk Pelindung Kabel 39.4197 m1 86,064 3,392,620.91
Nyfgby 4X6 Mm

3.01.02.04.02.004 Pembuatan Air Mancur ( 3,3 X 10 M2 ) m2 Nilai Asb 6,310,077.00


(Dibulatkan):

2.01.01.01.01.004 Uitzet&Bowplank 0.0303 m1 165,105 5,003.18


2.01.01.01.01.008 Pembersihan Awal & Akhir Lokasi Pekerjaan 0.0303 m2 17,825 540.15
2.01.01.01.02.001 Pekerjaan Galian Tanah 2.2003 m3 81,363 179,023.26
2.01.01.01.02.009 Urgan Tanah Kembali 0.4367 m3 59,225 25,861.58
2.01.01.01.02.019 Urugan Pasir Bawah Pondasi 0.0333 m3 256,864 8,562.13
2.01.01.01.02.019 Urugan Pasir Bawah Lantai 0.0797 m3 256,864 20,471.28
2.01.01.04.01.008 Pas.Rollag 1Pc : 5Ps 0.0727 m2 143,979 10,471.20
2.01.01.03.01.001 Rabat Beton 0.1097 m3 965,573 105,920.43
2.01.01.03.01.013 A Besi 8.2845 kg 22,044 182,624.52
2.01.01.03.01.005 B Beton Cor K.175 0.1197 m3 1,295,114 155,021.22
2.01.01.03.02.012 A. Bekesting (2X Pemakaian) 1.5836 m2 353,690 560,116.35
2.01.01.03.01.013 B. Besi 41.2130 kg 22,044 908,500.04
2.01.01.03.01.005 C. Beton Cor K.175 0.2376 m3 1,295,114 307,687.69
2.01.01.03.02.012 A. Bekesting (2X Pemakaian) 0.7170 m2 353,690 253,585.01
2.01.01.03.01.013 B. Besi 38.1476 kg 22,044 840,925.16
2.01.01.03.01.005 C. Beton Cor K.175 0.2373 m3 1,295,114 307,295.23
2.01.01.03.02.011 A. Bekesting (2X Pemakaian) 0.2855 m2 315,255 89,990.97
2.01.01.03.01.013 B. Besi 1.0988 kg 22,044 24,221.68
2.01.01.03.01.005 C. Beton Cor K.175 0.0064 m3 1,295,114 8,241.63
2.01.01.03.02.012 A. Bekesting (2X Pemakaian) 0.1076 m2 353,690 38,048.47
2.01.01.03.01.013 B. Besi 1.0988 kg 22,044 24,221.68
2.01.01.03.01.005 C. Beton Cor K.175 0.0064 m3 1,295,114 8,241.63
2.01.01.04.02.015 Benangan 0.0303 m1 23,682 717.64
2.01.01.04.01.008 Pas.1/2 Bata 1Pc : 5Ps 1.0482 m2 143,979 150,916.17
2.01.01.04.02.003 Plester + Aci 1Pc : 3Ps 1.7333 m2 72,161 125,079.07

266
KODE URAIAN KOEF SAT HARGA JUMLAH
SATUAN
a b c d f g
1.08.23.03.01.014.100 Pas.Text Acrilick 2.3030 m2 50,000 115,151.52

2.01.01.01.01.019 Pas.Rangka Papan Nama Bahan Hollow 0.0109 m2 1,873,078 20,433.58


2.01.01.06.01.023 Pas.Pintu Rumah Pompa 0.0303 unit 778,039 23,576.94
2.01.01.07.02.028 Pas.Pipa Pvc Aw dia.4inch. 0.4848 m1 1,024,088 496,527.52
2.01.01.07.02.027 Pas.Pipa Pvc Aw dia. 3inch. 0.9394 m1 711,259 668,152.39
2.01.01.07.02.023 Pas.Pipa Pvc Aw 1inch. 0.6364 m1 148,775 94,675.00
1.02.02.03.05.007.015 Pompa Air inch.Grundfosinch. 3" 1,5HP 0.0303 unit 14,688,000 445,090.91

2.01.01.02.01.012 Pengeboran Diameter 4inch. + Aksesoris 0.3636 m1 58,167 21,151.64


2.01.01.07.06.001 Pas.Stop Kontak (Rumah Pompa) 0.0303 titik 183,816 5,570.18
2.01.01.07.05.021 Pengecatan Besi 1.4636 m2 42,376 62,023.05
2.01.01.07.05.021 Pengecatan Dinding 0.3879 m2 42,376 16,436.75

267
PEMERINTAH KOTA

MOJOKERTO
2019

A S B NON FISIK

ANALISIS STANDAR BELANJA


(A S B )
REKAP
ANALISIS STANDAR BELANJA
PEMERINTAH KOTA MOJOKERTO TAHUN 2019

KODE BARANG URAIAN KEGIATAN ASUMSI OUTPUT HARGA


a b c d e
3.02 Asb Non Fisik
3.02.01 Analisis Standar Belanja Kegiatan
Non Fisik
3.02.01.01 Kegiatan Perencanaan
3.02.01.01.01 Penelitian / Kajian
3.02.01.01.01.001 Kegiatan Penelitian / Kajian Tipe 1 : Spesifikasi : Pendampingan Pihak Ke-3, 2 Penelitian/Kajian 56,287,500
Tenaga Ahli, 5 Surveyor(150 Respoden), 6 Kali
Rapat, Lama Pelaksanaan 3 Bulan
3.02.01.01.01.002 Kegiatan Penelitian / Kajian Tipe 2 : Spesifikasi : Pendampingan Pihak Ke-3, 3 Penelitian/Kajian 76,612,500
Tenaga Ahli, 5 Surveyor(150 Respoden), 6 Kali
Rapat, Fgd, Lama Pelaksanaan 3 Bulan

3.02.01.01.02 Kegiatan Penyusunan Rumusan


Kebijakan
3.02.01.01.02.001 Kegiatan Penyusunan Rumusan Spesifikasi : Pendampingan Pihak Ke-3, 3 Paket Kebijakan 74,147,500
Kebijakan Tipe 1 : Tenaga Ahli, 12 Kali Rapat/FGD, Lama
Pelaksanaan 3 Bulan
3.02.01.01.02.002 Kegiatan Penyusunan Rumusan Spesifikasi : Pendampingan Pihak Ke-3, 5 Paket Kebijakan 183,147,500
Kebijakan Tipe 2 : Tenaga Ahli, 20 Kali Rapat/FGD, Lama
Pelaksanaan 5 Bulan

3.02.01.02 Kegiatan Pelaksanaan


3.02.01.02.01 Kegiatan Sosialisasi / Penyuluhan :

3.02.01.02.01.001 Kegiatan Sosialisasi / Penyuluhan Spesifikasi : Gedung Eksternal, PNS/Internal Per Kegiatan 27,511,550
Tipe 1 : Pegawai Pemkot Mojokerto ( Kepala Skpd,
Direktur, Dan Setara Eselon II)

3.02.01.02.01.002 Kegiatan Sosialisasi / Penyuluhan Spesifikasi : Gedung Eksternal ,PNS/Internal Per Kegiatan 15,788,250
Tipe 2 : Pegawai Pemkot Mojokerto (Sekretaris S/D
Eselon III, Pimpinan Perusahaan,
BUMN/BUMD dan setara)
3.02.01.02.01.003 Kegiatan Sosialisasi / Penyuluhan Spesifikasi : , Gedung Eksternal, Non PNS/ Per Kegiatan 18,896,000
Tipe 3 : Masyarakat

3.02.01.02.02 Kegiatan Pelatihan / Bimtek /


Workshop
3.02.01.02.02.001 Kegiatan Pelatihan / Bimtek / Spesikasi : Gedung Internal, PNS/Internal Per Kegiatan 25,499,450
Workshop Tipe 1 : Pegawai Pemkot Mojokerto
3.02.01.02.02.002 Kegiatan Pelatihan / Bimtek / Spesikasi : Gedung Eskternal, PNS/Internal Per Kegiatan 23,509,300
Workshop Tipe 2 : Pegawai Pemkot Mojokerto
3.02.01.02.02.003 Kegiatan Pelatihan / Bimtek / Spesikasi : Gedung Internal, Non Per Kegiatan 16,816,100
Workshop Tipe 3 : PNS/Masyarakat
3.02.01.02.02.004 Kegiatan Pelatihan / Bimtek / Spesikasi : Gedung Eskternal, Non Per Kegiatan 20,427,900
Workshop Tipe 4 : PNS/Masyarakat

3.02.01.02.03 Kegiatan Pagelaran / Festival /


Pawai
3.02.01.02.03.001 Kegiatan Pagelaran / Festival / Spesifikasi : Skpd Selaku Penyelenggara,1 Hari Peserta 58,277,350
Pawai Tipe 1 : Pelaksanaan, Peserta Perorangan (50 Orang),
Bersifat Lomba
3.02.01.02.03.002 Kegiatan Pagelaran / Festival / Spesifikasi : Skpd Selaku Penyelenggara, 1 Hari Grup 53,229,850
Pawai Tipe 2 : Pelaksanaan, Peserta Max. 20 Orang/Grup,
Bersifat Lomba
3.02.01.02.03.003 Kegiatan Pagelaran / Festival / Spesifikasi : Mengirim Delegasi, 1 Delegasi 40 Peserta 56,917,200
Pawai Tipe 3 : Orang, Bersifat Lomba

3.02.01.02.04 Kegiatan Pameran / Expo

268
KODE BARANG URAIAN KEGIATAN ASUMSI OUTPUT HARGA
a b c d e
3.02.01.02.04.001 Kegiatan Pameran / Expo Tipe 1 : Spesifikasi : , Sebagai Penyelenggaraan, Lokasi Peserta 17,963,550
Acara (Asset Internal Pemkot), Maks.50 Stand
(3X3M) Peserta, Pelaksanaan Maks. 10 Hari

3.02.01.02.04.002 Kegiatan Pameran / Expo Tipe 2 : Spesifikasi : , Sebagai Penyelenggaraan, Lokasi Peserta 76,252,300
Acara (Eksternal Indoor), Maks.25 Stand
(3X3M)Peserta, Pelaksanaan Maks. 3 Hari

3.02.01.02.04.003 Kegiatan Pameran / Expo Tipe 3 : Spesifikasi : Sebagai Pengirim Peserta 55,459,050
Delegasi/Peserta, Skala Nasional
3.02.01.02.04.004 Kegiatan Pameran / Expo Tipe 4 : Spesifikasi :Sebagai Pengirim Delegasi/Peserta, Stand 6,407,350
Skala Regional, 1 stand 2 Orang

3.02.01.02.05 Kegiatan Lomba


3.02.01.02.05.001 Kegiatan Lomba Tipe 1 : Spesifikasi : Skpd Selaku Penyelenggara, Peserta 58,785,800
Lomba Bersifat Olahraga (Satu Cabor) Peserta
Perorangan
3.02.01.02.05.002 Kegiatan Lomba Tipe 2 : Spesifikasi : Skpd Selaku Penyelenggara Lomba Peserta 59,725,250
Bersifat Olahraga (Satu Cabor) Peserta
Kelompok, Max. 20 Orang/Kelompok

3.02.01.02.05.003 Kegiatan Lomba Tipe 3 : Spesifikasi : Sebagai Pengirim Delegasi/Peserta Peserta 14,532,500

269
ANALISIS STANDAR BELANJA NON FISIK
PEMERINTAH KOTA MOJOKERTO TAHUN 2019

KODE BARANG URAIAN KEGIATAN VOL. SATUAN HARGA SAT. HARGA

a b c d e f
3.02 Asb Non Fisik
3.02.01 Analisis Standar Belanja Kegiatan Non Fisik

3.02.01.01 Kegiatan Perencanaan


3.02.01.01.01 Penelitian / Kajian
3.02.01.01.01.001 Kegiatan Penelitian / Kajian Tipe 1 Output Penelitian/Ka
jian
Spesifikasi Pendampingan Pihak Ke-3, 2
Tenaga Ahli, 5 Surveyor(150 Respoden), 6 Kali
Rapat, Lama Pelaksanaan 3 Bulan

Hononarium Tenaga Ahli


1.10.28.02.02.002.028 Jasa Surveyor 150 OH 50,000 7,500,000
1.10.28.02.03.002.072 AHLI MADYA 6 OB 6,000,000 36,000,000
Total Honorarium Tenaga Ahli 43,500,000
Belanja Barang/Jasa
1.1.7.01.03.01.006.00014 Stop Map 50 Buah 8,950 447,500

1.1.7.01.03.02.001.00007 HVS 70 Gr 5 Rim 52,450 262,250

1.1.7.01.03.01.003.00003 Binder Clip 1 Dus 6,350 6,350

1.1.7.01.03.01.016.00001 Paper Clips 1 Buah 1,750 1,750

1.1.7.01.03.01.013.00001 Isi Stapples 3 Pak 3,500 10,500

1.1.7.01.03.01.012.00001 Staples/Hechmachine 1 Buah 19,000 19,000

1.1.7.01.03.01.001.00002 BallPoint 12 Buah 12,150 145,800

1.1.7.01.03.01.004.00003 Correction 2 Buah 5,800 11,600

1.1.7.01.03.02.004.00011 Amplop Putih 1 Dos 26,750 26,750

1.1.7.01.03.03.007.00001 Materai 12 Buah 4,000 48,000

1.1.7.01.03.03.007.00002 Materai 10 Buah 7,700 77,000

1.1.7.01.03.01.014.00062 Photo Copy 10000 Lembar 300 3,000,000

1.1.7.01.03.06.004.00003 Refil Printer 1 Buah 170,000 170,000

1.1.7.01.03.01.014.00182 Cetak Laporan 5 eksemplar 38,200 191,000

1.1.7.01.07.01.001.00080 Nasi Kotak 180 Kotak 29,000 5,220,000

1.1.7.01.07.01.001.00086 Snack Kotak 180 Kotak 17,500 3,150,000

Total Belanja Barang / Jasa 12,787,500


Nilai ASB: 56,287,500

270
KODE BARANG URAIAN KEGIATAN VOL. SATUAN HARGA SAT. HARGA

a b c d e f

3.02.01.01.01.002 Kegiatan Penelitian / Kajian Tipe 2 Output Penelitian/Ka


jian
Spesifikasi Pendampingan Pihak Ke-3, 3
Tenaga Ahli, 5 Surveyor(150 Respoden), 6 Kali
Rapat, Fgd, Lama Pelaksanaan 3 Bulan

Hononarium Tenaga Ahli


1.10.28.02.02.002.028 Jasa Surveyor 150 OH 50,000 7,500,000
1.10.28.02.03.002.072 AHLI MADYA 9 OB 6,000,000 54,000,000
Total Honorarium Tenaga Ahli 61,500,000
Belanja Barang/Jasa
1.1.7.01.03.01.006.00014 Stop Map 50 Buah 8,950 447,500

1.1.7.01.03.02.001.00007 HVS 70 Gr 5 Rim 52,450 262,250

1.1.7.01.03.01.003.00003 Binder Clip 1 Dus 6,350 6,350

1.1.7.01.03.01.016.00001 Paper Clips 1 Buah 1,750 1,750

1.1.7.01.03.01.013.00001 Isi Stapples 3 Pak 3,500 10,500

1.1.7.01.03.01.012.00001 Staples/Hechmachine 1 Buah 19,000 19,000

1.1.7.01.03.01.001.00002 BallPoint 12 Buah 12,150 145,800

1.1.7.01.03.01.004.00003 Correction 2 Buah 5,800 11,600

1.1.7.01.03.02.004.00011 Amplop Putih 1 Dos 26,750 26,750

1.1.7.01.03.03.007.00001 Materai 12 Buah 4,000 48,000

1.1.7.01.03.03.007.00002 Materai 10 Buah 7,700 77,000

1.1.7.01.03.01.014.00062 Photo Copy 10000 Lembar 300 3,000,000

1.1.7.01.03.06.004.00003 Refil Printer 1 Buah 170,000 170,000

1.1.7.01.03.01.014.00182 Cetak Laporan 5 eksemplar 38,200 191,000

1.1.7.01.07.01.001.00080 Nasi Kotak 230 Kotak 29,000 6,670,000

1.1.7.01.07.01.001.00086 Snack Kotak 230 Kotak 17,500 4,025,000

Total Belanja Barang / Jasa 15,112,500


Nilai ASB: 76,612,500

3.02.01.01.02 Kegiatan Penyusunan Rumusan Kebijakan

3.02.01.01.02.001 Kegiatan Penyusunan Rumusan Kebijakan Output Paket


Tipe 1 Kebijakan
Spesifikasi Pendampingan Pihak Ke-3, 3
Tenaga Ahli, 12 Kali Rapat/FGD, Lama
Pelaksanaan 3 Bulan

Hononarium Tenaga Ahli


1.10.28.02.03.002.072 AHLI MADYA 9 OB 6,000,000 54,000,000
Total Honorarium Tenaga Ahli 54,000,000

271
KODE BARANG URAIAN KEGIATAN VOL. SATUAN HARGA SAT. HARGA

a b c d e f
Belanja Barang/Jasa
1.1.7.01.03.01.006.00014 Stop Map 50 Buah 8,950 447,500

1.1.7.01.03.02.001.00007 HVS 70 Gr 5 Rim 52,450 262,250

1.1.7.01.03.01.003.00003 Binder Clip 1 Dus 6,350 6,350

1.1.7.01.03.01.016.00001 Paper Clips 1 Buah 1,750 1,750

1.1.7.01.03.01.013.00001 Isi Stapples 3 Pak 3,500 10,500

1.1.7.01.03.01.012.00001 Staples/Hechmachine 1 Buah 19,000 19,000

1.1.7.01.03.01.001.00002 BallPoint 12 Buah 12,150 145,800

1.1.7.01.03.01.004.00003 Correction 2 Buah 5,800 11,600

1.1.7.01.03.02.004.00011 Amplop Putih 1 Dos 26,750 26,750

1.1.7.01.03.03.007.00001 Materai 12 Buah 4,000 48,000

1.1.7.01.03.03.007.00002 Materai 10 Buah 7,700 77,000

1.1.7.01.03.01.014.00062 Photo Copy 5000 Lembar 300 1,500,000

1.1.7.01.03.06.004.00003 Refil Printer 3 Buah 170,000 510,000

1.1.7.01.03.01.014.00183 Cetak Laporan 5 eksemplar 68,200 341,000

1.1.7.01.07.01.001.00080 Nasi Kotak 360 Kotak 29,000 10,440,000

1.1.7.01.07.01.001.00086 Snack Kotak 360 Kotak 17,500 6,300,000

Total Belanja Barang / Jasa 20,147,500


Nilai ASB: 74,147,500

3.02.01.01.02.002 Kegiatan Penyusunan Rumusan Kebijakan Output Paket


Tipe 2 Kebijakan
Spesifikasi Pendampingan Pihak Ke-3, 5
Tenaga Ahli, 20 Kali Rapat/FGD, Lama
Pelaksanaan 5 Bulan

Hononarium Tenaga Ahli


1.10.28.02.03.002.072 AHLI MADYA 25 OB 6,000,000 150,000,000
Total Hononarium Tenaga Ahli 150,000,000
Belanja Barang/Jasa
1.1.7.01.03.01.006.00014 Stop Map 50 Buah 8,950 447,500

1.1.7.01.03.02.001.00007 HVS 70 Gr 5 Rim 52,450 262,250

1.1.7.01.03.01.003.00003 Binder Clip 1 Dus 6,350 6,350

1.1.7.01.03.01.016.00001 Paper Clips 1 Buah 1,750 1,750

1.1.7.01.03.01.013.00001 Isi Stapples 3 Pak 3,500 10,500

1.1.7.01.03.01.012.00001 Staples/Hechmachine 1 Buah 19,000 19,000

1.1.7.01.03.01.001.00002 BallPoint 12 Buah 12,150 145,800

272
KODE BARANG URAIAN KEGIATAN VOL. SATUAN HARGA SAT. HARGA

a b c d e f
1.1.7.01.03.01.004.00003 Correction 2 Buah 5,800 11,600

1.1.7.01.03.02.004.00011 Amplop Putih 1 Dos 26,750 26,750

1.1.7.01.03.03.007.00001 Materai 12 Buah 4,000 48,000

1.1.7.01.03.03.007.00002 Materai 10 Buah 7,700 77,000

1.1.7.01.03.01.014.00062 Photo Copy 10000 Lembar 300 3,000,000

1.1.7.01.03.06.004.00003 Refil Printer 5 Buah 170,000 850,000

1.1.7.01.03.01.014.00183 Cetak Laporan 5 eksemplar 68,200 341,000

1.1.7.01.07.01.001.00080 Nasi Kotak 600 Kotak 29,000 17,400,000

1.1.7.01.07.01.001.00086 Snack Kotak 600 Kotak 17,500 10,500,000

Total Belanja Barang / Jasa 33,147,500


Nilai ASB: 183,147,500

3.02.01.02 Kegiatan Pelaksanaan


3.02.01.02.01 Kegiatan Sosialisasi / Penyuluhan
3.02.01.02.01.001 Kegiatan Sosialisasi / Penyuluhan Tipe 1 Output Per Kegiatan

Spesifikasi Gedung Eksternal, Pns/Internal per orang


Pegawai Pemkot Mojokerto ( Kepala Skpd,
Direktur, Dan Setara Eselon II)

Parameter
- Jumlah Peserta (Wajib Diisi) 50 Orang
- Lama Kegiatan (Wajib Diisi) 1 Hari
Biaya Variabel Hononarium
1.10.28.02.02.002.001 Moderator 1 OH 700,000 700,000
1.10.28.02.02.002.002 Pembawa Acara 1 OH 250,000 250,000
1.10.28.02.02.002.003 Pembaca Doa 1 OH 200,000 200,000
Total Biaya Variabel Hononarium: 1,150,000
Biaya Tetap
1.1.7.01.03.02.004.00011 Amplop Putih 1 Dos 26,750 26,750

1.1.7.01.03.01.006.00014 Stop Map 50 Buah 8,950 447,500

1.1.7.01.03.02.001.00007 HVS 70 Gr 2 Rim 52,450 104,900

1.1.7.01.03.01.003.00003 Binder Clip 1 Dus 6,350 6,350

1.1.7.01.03.01.016.00001 Paper Clips 1 Buah 1,750 1,750

1.1.7.01.03.01.013.00001 Isi Stapples 3 Pak 3,500 10,500

1.1.7.01.03.01.001.00010 Spidol 2 Buah 8,950 17,900

1.1.7.01.03.01.012.00001 Staples/Hechmachine 1 Buah 19,000 19,000

1.1.7.01.03.01.001.00002 BallPoint 12 Buah 12,150 145,800

1.1.7.01.03.01.004.00003 Correction 2 Buah 5,800 11,600

1.1.7.01.03.03.007.00001 Materai 12 Buah 4,000 48,000

273
KODE BARANG URAIAN KEGIATAN VOL. SATUAN HARGA SAT. HARGA

a b c d e f
1.1.7.01.03.03.007.00002 Materai 10 Buah 7,700 77,000

1.1.7.01.03.06.004.00003 Refil Printer 1 Buah 170,000 170,000

1.1.7.01.03.01.014.00066 Spanduk Print Digital 5 m2 25,750 128,750

1.1.7.01.03.01.014.00062 Photo Copy 500 Lembar 300 150,000

Total Biaya Tetap 1,365,800


Biaya Variabel
1.10.28.02.02.003.002 Jasa Narasumber Kegiatan Seminar/ Rakor/ 4 OJ 1,750,000 7,000,000
Sosialisasi/ Diseminasi / FGD / Bintek (Kegiatan
Sejenis)
1.1.7.01.03.01.006.00017 Stop Map 55 Buah 14,000 770,000

1.1.7.01.03.01.005.00002 Buku Block Note 55 Buah 3,500 192,500

1.1.7.01.03.01.001.00003 BallPoint 55 Buah 4,250 233,750

1.1.7.01.03.01.014.00185 Cetak Handout Seminar 55 eksemplar 18,500 1,017,500

9.1.2.07.03.01.001.00005 Sewa Gedung Pertemuan 1 Ruang 7,809,400 7,809,400

9.1.2.10.07.01.001.00043 Sewa Podium Lengkap 1 Unit 264,400 264,400

9.1.2.10.03.01.001.00001 Sewa LCD Proyektor 1 Unit/Hari 300,000 300,000

9.1.2.10.03.01.001.00002 Sewa Layar Proyektor (Tripot) 1 Unit/Hari 58,100 58,100

9.1.2.10.01.01.001.00002 Sewa Meja Sidang 6 Unit/Hari 58,100 348,600

9.1.2.10.01.01.001.00030 Sewa Kursi Backled + Cover 55 Buah 12,000 660,000

1.1.7.01.07.01.001.00083 Prasmanan 55 Per Pack 89,300 4,911,500

1.1.7.01.07.01.001.00088 Coffee break 55 Per Pack 26,000 1,430,000

Total Biaya Variabel 24,995,750


Nilai ASB 27,511,550
Nilai ASB Per Peserta 550,231

3.02.01.02.01.002 Kegiatan Sosialisasi / Penyuluhan Tipe 2 Output Per Kegiatan

Spesifikasi Gedung Eksternal ,PNS/Internal


Pegawai Pemkot Mojokerto (Sekretaris S/D
Eselon III, Pimpinan Perusahaan,
BUMN/BUMD dan setara)

Parameter
- Jumlah Peserta (Wajib Diisi) 50 Orang
- Lama Kegiatan (Wajib Diisi) 1 Hari
Biaya Variabel Hononarium
1.10.28.02.02.002.001 Moderator 1 OH 700,000 700,000
1.10.28.02.02.002.002 Pembawa Acara 1 OH 250,000 250,000
1.10.28.02.02.002.003 Pembaca Doa 1 OH 200,000 200,000
Total Biaya Variabel Hononarium 1,150,000

274
KODE BARANG URAIAN KEGIATAN VOL. SATUAN HARGA SAT. HARGA

a b c d e f
Biaya Tetap
1.1.7.01.03.02.004.00011 Amplop Putih 1 Dos 26,750 26,750

1.1.7.01.03.01.006.00014 Stop Map 50 Buah 8,950 447,500

1.1.7.01.03.02.001.00007 HVS 70 Gr 2 Rim 52,450 104,900

1.1.7.01.03.01.003.00003 Binder Clip 1 Dus 6,350 6,350

1.1.7.01.03.01.016.00001 Paper Clips 1 Buah 1,750 1,750

1.1.7.01.03.01.013.00001 Isi Stapples 3 Pak 3,500 10,500

1.1.7.01.03.01.001.00010 Spidol 2 Buah 8,950 17,900

1.1.7.01.03.01.012.00001 Staples/Hechmachine 1 Buah 19,000 19,000

1.1.7.01.03.01.001.00002 BallPoint 12 Buah 12,150 145,800

1.1.7.01.03.01.004.00003 Correction 2 Buah 5,800 11,600

1.1.7.01.03.03.007.00001 Materai 12 Buah 4,000 48,000

1.1.7.01.03.03.007.00002 Materai 10 Buah 7,700 77,000

1.1.7.01.03.01.014.00066 Spanduk Print Digital 5 m2 25,750 128,750

1.1.7.01.03.01.014.00062 Photo Copy 500 Lembar 300 150,000

1.1.7.01.03.06.004.00003 Refil Printer 1 Buah 170,000 170,000

Total Biaya Tetap 1,365,800


Biaya Variabel
1.10.28.02.02.003.003 Jasa Narasumber Kegiatan Seminar/ Rakor/ 4 OJ 1,000,000 4,000,000
Sosialisasi/ Diseminasi / FGD / Bintek (Kegiatan
Sejenis)
1.1.7.01.03.01.006.00011 Snelhecter Map 55 Buah 2,800 154,000

1.1.7.01.03.01.005.00002 Buku Block Note 55 Buah 3,500 192,500

1.1.7.01.03.01.001.00003 BallPoint 55 Buah 4,250 233,750

1.1.7.01.03.01.014.00185 Cetak Handout Seminar 55 eksemplar 18,500 1,017,500

9.1.2.10.07.01.001.00043 Sewa Podium Lengkap 1 Unit 264,400 264,400

9.1.2.07.03.01.001.00002 Sewa Gedung Pertemuan 1 Per Ruang 3,486,100 3,486,100

9.1.2.10.03.01.001.00001 Sewa LCD Proyektor 1 Unit/Hari 300,000 300,000

9.1.2.10.03.01.001.00002 Sewa Layar Proyektor (Tripot) 1 Unit/Hari 58,100 58,100

9.1.2.10.01.01.001.00002 Sewa Meja Sidang 6 Unit/Hari 58,100 348,600

9.1.2.10.01.01.001.00030 Sewa Kursi Backled + Cover 55 Buah 12,000 660,000

275
KODE BARANG URAIAN KEGIATAN VOL. SATUAN HARGA SAT. HARGA

a b c d e f
1.1.7.01.07.01.001.00080 Nasi Kotak 55 Kotak 29,000 1,595,000

1.1.7.01.07.01.001.00086 Snack Kotak 55 Kotak 17,500 962,500

Total Biaya Variabel 13,272,450


Nilai ASB 15,788,250
Nilai ASB Per Peserta 315,765

3.02.01.02.01.003 Kegiatan Sosialisasi / Penyuluhan Tipe 3 Output Per Kegiatan

Spesifikasi , Gedung Eksternal, Non PNS/


Masyarakat
Parameter
- Jumlah Peserta (Wajib Diisi) 50 Orang
- Lama Kegiatan (Wajib Diisi) 1 Hari
Biaya Variabel Hononarium
1.10.28.02.02.002.001 Moderator 1 OH 700,000 700,000
1.10.28.02.02.002.002 Pembawa Acara 1 OH 250,000 250,000
1.10.28.02.02.002.003 Pembaca Doa 1 OH 200,000 200,000
Total Biaya Variabel Hononarium 1,150,000
Biaya Tetap
1.1.7.01.03.02.004.00011 Amplop Putih 1 Dos 26,750 26,750

1.1.7.01.03.01.006.00014 Stop Map 50 Buah 8,950 447,500

1.1.7.01.03.02.001.00007 HVS 70 Gr 2 Rim 52,450 104,900

1.1.7.01.03.01.003.00003 Binder Clip 1 Dus 6,350 6,350

1.1.7.01.03.01.016.00001 Paper Clips 1 Buah 1,750 1,750

1.1.7.01.03.01.013.00001 Isi Stapples 3 Pak 3,500 10,500

1.1.7.01.03.01.001.00010 Spidol 2 Buah 8,950 17,900

1.1.7.01.03.01.012.00001 Staples/Hechmachine 1 Buah 19,000 19,000

1.1.7.01.03.01.001.00002 BallPoint 12 Buah 12,150 145,800

1.1.7.01.03.01.004.00003 Correction 2 Buah 5,800 11,600

1.1.7.01.03.03.007.00001 Materai 12 Buah 4,000 48,000

1.1.7.01.03.03.007.00002 Materai 10 Buah 7,700 77,000

1.1.7.01.03.01.014.00066 Spanduk Print Digital 5 m2 25,750 128,750

1.1.7.01.03.01.014.00062 Photo Copy 500 Lembar 300 150,000

1.1.7.01.03.06.004.00003 Refil Printer 1 Buah 170,000 170,000

Total Biaya Tetap 1,365,800

276
KODE BARANG URAIAN KEGIATAN VOL. SATUAN HARGA SAT. HARGA

a b c d e f
Biaya Variabel
1.10.28.02.02.003.004 Jasa Narasumber Kegiatan Seminar/ Rakor/ 4 OJ 900,000 3,600,000
Sosialisasi/ Diseminasi / FGD / Bintek (Kegiatan
Sejenis)
1.1.7.01.03.01.006.00011 Snelhecter Map 55 Buah 2,800 154,000

1.1.7.01.03.01.005.00002 Buku Block Note 55 Buah 3,500 192,500

1.1.7.01.03.01.001.00003 BallPoint 55 Buah 4,250 233,750

1.1.7.01.03.01.014.00185 Cetak Handout Seminar 55 eksemplar 18,500 1,017,500

1.10.28.03.01.011.004 Transport Peserta (Dalam Kota) 50 OH 80,000 4,000,000


9.1.2.10.07.01.001.00043 Sewa Podium Lengkap 1 Unit 264,400 264,400

9.1.2.10.03.01.001.00001 Sewa LCD Proyektor 1 Unit/Hari 300,000 300,000

9.1.2.10.03.01.001.00002 Sewa Layar Proyektor (Tripot) 1 Unit/Hari 58,100 58,100

9.1.2.10.01.01.001.00002 Sewa Meja Sidang 6 Unit/Hari 58,100 348,600

9.1.2.10.01.01.001.00026 Sewa Kursi Plastik 55 Buah 3,050 167,750

9.1.2.07.03.01.001.00002 Sewa Gedung Pertemuan 1 Per Ruang 3,486,100 3,486,100

1.1.7.01.07.01.001.00080 Nasi Kotak 55 Kotak 29,000 1,595,000

1.1.7.01.07.01.001.00086 Snack Kotak 55 Kotak 17,500 962,500

Total Biaya Variabel 16,380,200


Nilai ASB 18,896,000
Nilai ASB Per Peserta 377,920

3.02.01.02.02 Kegiatan Pelatihan / Bimtek / Workshop

3.02.01.02.02.001 Kegiatan Pelatihan / Bimtek / Workshop Tipe Output Per Kegiatan


1
Spesikasi Gedung Internal, PNS/Internal
Pegawai Pemkot Mojokerto

Parameter
- Jumlah Peserta (Wajib Diisi) 50 Orang
- Lama Kegiatan (Wajib Diisi) 1 Hari
Biaya Tetap
1.1.7.01.03.02.004.00011 Amplop Putih 1 Dos 26,750 26,750

1.1.7.01.03.01.006.00014 Stop Map 50 Buah 8,950 447,500

1.1.7.01.03.02.001.00007 HVS 70 Gr 2 Rim 52,450 104,900

1.1.7.01.03.01.003.00003 Binder Clip 1 Dus 6,350 6,350

1.1.7.01.03.01.016.00001 Paper Clips 1 Buah 1,750 1,750

1.1.7.01.03.01.013.00001 Isi Stapples 3 Pak 3,500 10,500

1.1.7.01.03.01.001.00010 Spidol 2 Buah 8,950 17,900

277
KODE BARANG URAIAN KEGIATAN VOL. SATUAN HARGA SAT. HARGA

a b c d e f
1.1.7.01.03.01.012.00001 Staples/Hechmachine 1 Buah 19,000 19,000

1.1.7.01.03.01.001.00002 BallPoint 12 Buah 12,150 145,800

1.1.7.01.03.01.004.00003 Correction 2 Buah 5,800 11,600

1.1.7.01.03.03.007.00001 Materai 12 Buah 4,000 48,000

1.1.7.01.03.03.007.00002 Materai 10 Buah 7,700 77,000

1.1.7.01.03.01.014.00066 Spanduk Print Digital 5 m2 25,750 128,750

1.1.7.01.03.01.014.00062 Photo Copy 1000 Lembar 300 300,000

1.1.7.01.03.06.004.00003 Refil Printer 2 Buah 170,000 340,000

Total Biaya Tetap 1,685,800


Biaya Variabel
1.10.28.02.02.003.002 Jasa Narasumber Kegiatan Seminar/ Rakor/ 6 OJ 1,750,000 10,500,000
Sosialisasi/ Diseminasi / FGD / Bintek (Kegiatan
Sejenis)
1.1.7.01.03.09.008.00119 Tas Pelatihan 55 Buah 94,750 5,211,250

1.1.7.01.03.01.005.00002 Buku Block Note 55 Buah 3,500 192,500

1.1.7.01.03.01.001.00003 BallPoint 55 Buah 4,250 233,750

9.1.2.10.07.01.001.00043 Sewa Podium Lengkap 1 Unit 264,400 264,400

9.1.2.10.01.01.001.00002 Sewa Meja Sidang 4 Unit/Hari 58,100 232,400

9.1.2.10.01.01.001.00017 Sewa Meja Kotak 13 Unit 24,000 312,000

9.1.2.10.01.01.001.00026 Sewa Kursi Plastik 55 Buah 3,050 167,750

9.1.2.10.03.01.001.00001 Sewa LCD Proyektor 1 Unit/Hari 300,000 300,000

9.1.2.10.03.01.001.00002 Sewa Layar Proyektor (Tripot) 1 Unit/Hari 58,100 58,100

1.1.7.01.07.01.001.00083 Prasmanan 55 Per Pack 89,300 4,911,500

1.1.7.01.07.01.001.00088 Coffee break 55 Per Pack 26,000 1,430,000

Total Biaya Variabel 23,813,650


Nilai ASB 25,499,450
Nilai ASB Per Peserta 509,989

3.02.01.02.02.002 Kegiatan Pelatihan / Bimtek / Workshop Tipe Output Per Kegiatan


2
Spesikasi Gedung Eskternal, PNS/Internal
Pegawai Pemkot Mojokerto

Parameter
- Jumlah Peserta (Wajib Diisi) 50 Orang
- Lama Kegiatan (Wajib Diisi) 1 Hari
Biaya Tetap
1.1.7.01.03.02.004.00011 Amplop Putih 1 Dos 26,750 26,750

1.1.7.01.03.01.006.00014 Stop Map 50 Buah 8,950 447,500

278
KODE BARANG URAIAN KEGIATAN VOL. SATUAN HARGA SAT. HARGA

a b c d e f
1.1.7.01.03.02.001.00007 HVS 70 Gr 2 Rim 52,450 104,900

1.1.7.01.03.01.003.00003 Binder Clip 1 Dus 6,350 6,350

1.1.7.01.03.01.016.00001 Paper Clips 1 Buah 1,750 1,750

1.1.7.01.03.01.013.00001 Isi Stapples 3 Pak 3,500 10,500

1.1.7.01.03.01.001.00010 Spidol 2 Buah 8,950 17,900

1.1.7.01.03.01.012.00001 Staples/Hechmachine 1 Buah 19,000 19,000

1.1.7.01.03.01.001.00002 BallPoint 12 Buah 12,150 145,800

1.1.7.01.03.01.004.00003 Correction 2 Buah 5,800 11,600

1.1.7.01.03.03.007.00001 Materai 12 Buah 4,000 48,000

1.1.7.01.03.03.007.00002 Materai 10 Buah 7,700 77,000

1.1.7.01.03.01.014.00066 Spanduk Print Digital 5 m2 25,750 128,750

1.1.7.01.03.01.014.00062 Photo Copy 1000 Lembar 300 300,000

1.1.7.01.03.06.004.00003 Refil Printer 2 Buah 170,000 340,000

Total Biaya Tetap 1,685,800


Biaya Variabel
1.10.28.02.02.003.003 Jasa Narasumber Kegiatan Seminar/ Rakor/ 6 OJ 1,000,000 6,000,000
Sosialisasi/ Diseminasi / FGD / Bintek (Kegiatan
Sejenis)
1.1.7.01.03.09.008.00118 Tas Pelatihan 55 Buah 77,000 4,235,000

1.1.7.01.03.01.005.00002 Buku Block Note 55 Buah 3,500 192,500

1.1.7.01.03.01.001.00003 BallPoint 55 Buah 4,250 233,750

9.1.2.10.07.01.001.00043 Sewa Podium Lengkap 1 Unit 264,400 264,400

9.1.2.07.03.01.001.00002 Sewa Gedung Pertemuan 1 Per Ruang 3,486,100 3,486,100

9.1.2.10.01.01.001.00002 Sewa Meja Sidang 4 Unit/Hari 58,100 232,400

9.1.2.10.01.01.001.00017 Sewa Meja Kotak 13 Unit 24,000 312,000

9.1.2.10.01.01.001.00026 Sewa Kursi Plastik 55 Buah 3,050 167,750

9.1.2.10.03.01.001.00001 Sewa LCD Proyektor 1 Unit/Hari 300,000 300,000

9.1.2.10.03.01.001.00002 Sewa Layar Proyektor (Tripot) 1 Unit/Hari 58,100 58,100

1.1.7.01.07.01.001.00083 Prasmanan 55 Per Pack 89,300 4,911,500

1.1.7.01.07.01.001.00088 Coffee break 55 Per Pack 26,000 1,430,000

Total Biaya Variabel 21,823,500


Nilai ASB 23,509,300
Nilai ASB Per Peserta 470,186

279
KODE BARANG URAIAN KEGIATAN VOL. SATUAN HARGA SAT. HARGA

a b c d e f

3.02.01.02.02.003 Kegiatan Pelatihan / Bimtek / Workshop Tipe Output Per Kegiatan


3
Spesikasi Gedung Internal, Non
PNS/Masyarakat
Parameter
- Jumlah Peserta (Wajib Diisi) 50 Orang
- Lama Kegiatan (Wajib Diisi) 1 Hari
Biaya Tetap
1.1.7.01.03.02.004.00011 Amplop Putih 1 Dos 26,750 26,750

1.1.7.01.03.01.006.00014 Stop Map 50 Buah 8,950 447,500

1.1.7.01.03.02.001.00007 HVS 70 Gr 2 Rim 52,450 104,900

1.1.7.01.03.01.003.00003 Binder Clip 1 Dus 6,350 6,350

1.1.7.01.03.01.016.00001 Paper Clips 1 Buah 1,750 1,750

1.1.7.01.03.01.013.00001 Isi Stapples 3 Pak 3,500 10,500

1.1.7.01.03.01.001.00010 Spidol 2 Buah 8,950 17,900

1.1.7.01.03.01.012.00001 Staples/Hechmachine 1 Buah 19,000 19,000

1.1.7.01.03.01.001.00002 BallPoint 12 Buah 12,150 145,800

1.1.7.01.03.01.004.00003 Correction 2 Buah 5,800 11,600

1.1.7.01.03.03.007.00001 Materai 12 Buah 4,000 48,000

1.1.7.01.03.03.007.00002 Materai 10 Buah 7,700 77,000

1.1.7.01.03.01.014.00066 Spanduk Print Digital 5 m2 25,750 128,750

1.1.7.01.03.01.014.00062 Photo Copy 1000 Lembar 300 300,000

1.1.7.01.03.06.004.00003 Refil Printer 2 Buah 170,000 340,000

Total Biaya Tetap 1,685,800


Biaya Variabel
1.10.28.02.02.003.003 Jasa Narasumber Kegiatan Seminar/ Rakor/ 6 OJ 1,000,000 6,000,000
Sosialisasi/ Diseminasi / FGD / Bintek (Kegiatan
Sejenis)
1.10.28.03.01.011.004 Transport Peserta (Dalam Kota) 55 OH 80,000 4,400,000
1.1.7.01.03.01.006.00017 Stop Map 55 Buah 14,000 770,000

1.1.7.01.03.01.005.00002 Buku Block Note 55 Buah 3,500 192,500

1.1.7.01.03.01.001.00003 BallPoint 55 Buah 4,250 233,750

9.1.2.10.07.01.001.00043 Sewa Podium Lengkap 1 Unit 264,400 264,400

9.1.2.10.01.01.001.00002 Sewa Meja Sidang 4 Unit/Hari 58,100 232,400

9.1.2.10.01.01.001.00017 Sewa Meja Kotak 13 Unit 24,000 312,000

9.1.2.10.01.01.001.00026 Sewa Kursi Plastik 55 Buah 3,050 167,750

280
KODE BARANG URAIAN KEGIATAN VOL. SATUAN HARGA SAT. HARGA

a b c d e f
1.1.7.01.07.01.001.00080 Nasi Kotak 55 Kotak 29,000 1,595,000

1.1.7.01.07.01.001.00086 Snack Kotak 55 Kotak 17,500 962,500

Total Biaya Variabel 15,130,300


Nilai ASB 16,816,100
Nilai ASB Per Peserta 336,322

3.02.01.02.02.004 Kegiatan Pelatihan / Bimtek / Workshop Tipe Output Per Kegiatan


4
Spesikasi Gedung Eskternal, Non
PNS/Masyarakat
Parameter
- Jumlah Peserta (Wajib Diisi) 50 Orang
- Lama Kegiatan (Wajib Diisi) 1 Hari
Biaya Tetap
1.1.7.01.03.02.004.00011 Amplop Putih 1 Dos 26,750 26,750

1.1.7.01.03.01.006.00014 Stop Map 50 Buah 8,950 447,500

1.1.7.01.03.02.001.00007 HVS 70 Gr 2 Rim 52,450 104,900

1.1.7.01.03.01.003.00003 Binder Clip 1 Dus 6,350 6,350

1.1.7.01.03.01.016.00001 Paper Clips 1 Buah 1,750 1,750

1.1.7.01.03.01.013.00001 Isi Stapples 3 Pak 3,500 10,500

1.1.7.01.03.01.001.00010 Spidol 2 Buah 8,950 17,900

1.1.7.01.03.01.012.00001 Staples/Hechmachine 1 Buah 19,000 19,000

1.1.7.01.03.01.001.00002 BallPoint 12 Buah 12,150 145,800

1.1.7.01.03.01.004.00003 Correction 2 Buah 5,800 11,600

1.1.7.01.03.03.007.00001 Materai 12 Buah 4,000 48,000

1.1.7.01.03.03.007.00002 Materai 10 Buah 7,700 77,000

1.1.7.01.03.01.014.00066 Spanduk Print Digital 5 m2 25,750 128,750

1.1.7.01.03.01.014.00062 Photo Copy 1000 Lembar 300 300,000

1.1.7.01.03.06.004.00003 Refil Printer 2 Buah 170,000 340,000

Total Biaya Tetap 1,685,800


Biaya Variabel
1.10.28.02.02.003.003 Jasa Narasumber Kegiatan Seminar/ Rakor/ 6 OJ 1,000,000 6,000,000
Sosialisasi/ Diseminasi / FGD / Bintek (Kegiatan
Sejenis)
1.10.28.03.01.011.004 Transport Peserta (Dalam Kota) 55 OH 80,000 4,400,000
1.1.7.01.03.01.006.00017 Stop Map 55 Buah 14,000 770,000

1.1.7.01.03.01.005.00002 Buku Block Note 55 Buah 3,500 192,500

1.1.7.01.03.01.001.00003 BallPoint 55 Buah 4,250 233,750

9.1.2.10.07.01.001.00043 Sewa Podium Lengkap 1 Unit 264,400 264,400

281
KODE BARANG URAIAN KEGIATAN VOL. SATUAN HARGA SAT. HARGA

a b c d e f
9.1.2.07.03.01.001.00002 Sewa Gedung Pertemuan 1 Per Ruang 3,486,100 3,486,100

9.1.2.10.01.01.001.00017 Sewa Meja Kotak 13 Unit 24,000 312,000

9.1.2.10.01.01.001.00026 Sewa Kursi Plastik 55 Buah 3,050 167,750

9.1.2.10.03.01.001.00001 Sewa LCD Proyektor 1 Unit/Hari 300,000 300,000

9.1.2.10.03.01.001.00002 Sewa Layar Proyektor (Tripot) 1 Unit/Hari 58,100 58,100

1.1.7.01.07.01.001.00080 Nasi Kotak 55 Kotak 29,000 1,595,000

1.1.7.01.07.01.001.00086 Snack Kotak 55 Kotak 17,500 962,500

Total Biaya Variabel 18,742,100


Nilai ASB 20,427,900
Nilai ASB Per Peserta 408,558

3.02.01.02.03 Kegiatan Pagelaran / Festival / Pawai

3.02.01.02.03.001 Kegiatan Pagelaran / Festival / Pawai Tipe 1 Output Peserta

Spesifikasi Skpd Selaku Penyelenggara,1 Hari


Pelaksanaan, Peserta Perorangan (50 Orang),
Bersifat Lomba

Biaya Tetap Hononarium


1.10.28.02.02.002.006 Jasa Juri Profesional / Juri Propinsi 3 OH 1,000,000 3,000,000
1.10.28.02.02.002.002 Pembawa Acara 2 OH 250,000 500,000
1.10.28.02.02.002.038 Jasa Petugas Keamanan 30 OH 100,000 3,000,000
Total Biaya Tetap Hononarium 6,500,000
Biaya Tetap
1.1.7.01.03.02.001.00007 HVS 70 Gr 1 Rim 52,450 52,450

1.1.7.01.03.01.001.00002 BallPoint 5 Buah 12,150 60,750

1.1.7.01.03.01.003.00002 Binder Clip 2 Dus 4,150 8,300

1.1.7.01.03.01.006.00015 Stop Map 2 Buah 8,500 17,000

1.1.7.01.03.01.016.00001 Paper Clips 1 Buah 1,750 1,750

1.1.7.01.03.01.013.00001 Isi Stapples 3 Pak 3,500 10,500

1.1.7.01.03.03.007.00001 Materai 4 Buah 4,000 16,000

1.1.7.01.03.03.007.00002 Materai 6 Buah 7,700 46,200

1.1.7.01.07.01.002.00003 Air Mineral 6 Botol 4,000 24,000

1.1.7.01.03.01.014.00062 Photo Copy 500 Lembar 300 150,000

9.1.2.10.07.01.001.00056 Sewa Dekorasi 25 m2 720,900 18,022,500

9.1.2.10.07.01.001.00029 Sewa Panggung 25 m2 18,050 451,250

9.1.2.10.07.01.001.00048 Sewa Taman, Backdrop,dll 20 m2 300,000 6,000,000

282
KODE BARANG URAIAN KEGIATAN VOL. SATUAN HARGA SAT. HARGA

a b c d e f
9.1.2.10.07.01.001.00051 Sewa Umbul-umbul 10 Unit 24,900 249,000

9.1.2.10.07.01.001.00018 Sewa Sound System 1 Unit 5,810,150 5,810,150

1.1.7.01.03.01.014.00013 Cetak Brosur/Leaflet 2 Pak 640,550 1,281,100

1.1.7.01.03.01.014.00023 Cetak Poster 1 Rim 1,409,150 1,409,150

1.1.7.01.03.01.014.00066 Spanduk Print Digital 5 m2 25,750 128,750

1.1.7.01.03.01.014.00007 Cetak Backdrop/Banner 20 m2 32,200 644,000

1.3.5.02.03.01.004.00009 Hadiah Perlombaan Non Akademik Bidang 1 Paket 12,000,000 12,000,000


Seni Budaya Tingkat Kota
1.3.5.02.03.01.001.00040 Trophy Kaki Empat 1 Buah 439,300 439,300

1.3.5.02.03.01.001.00037 Trophy Kaki Empat 1 Buah 398,650 398,650

1.3.5.02.03.01.001.00035 Trophy Kaki Empat 1 Buah 371,550 371,550

1.1.7.01.07.01.001.00080 Nasi Kotak 90 Kotak 29,000 2,610,000

1.1.7.01.07.01.001.00086 Snack Kotak 90 Kotak 17,500 1,575,000

Total Biaya Tetap 51,777,350


Nilai ASB 58,277,350

3.02.01.02.03.002 Kegiatan Pagelaran / Festival / Pawai Tipe 2 Output Grup

Spesifikasi Skpd Selaku Penyelenggara, 1 Hari


Pelaksanaan, Peserta Max. 20 Orang/Grup,
Bersifat Lomba

Biaya Tetap Hononarium


1.10.28.02.02.002.006 Jasa Juri Profesional / Juri Propinsi 3 OH 1,000,000 3,000,000
1.10.28.02.02.002.002 Pembawa Acara 2 OH 250,000 500,000
1.10.28.02.02.002.038 Jasa Petugas Keamanan 30 OH 100,000 3,000,000
Total Biaya Tetap Hononarium 6,500,000
Biaya Tetap
1.1.7.01.03.02.001.00007 HVS 70 Gr 1 Rim 52,450 52,450

1.1.7.01.03.01.001.00002 BallPoint 5 Buah 12,150 60,750

1.1.7.01.03.01.003.00002 Binder Clip 2 Dus 4,150 8,300

1.1.7.01.03.01.006.00015 Stop Map 2 Buah 8,500 17,000

1.1.7.01.03.01.016.00001 Paper Clips 1 Buah 1,750 1,750

1.1.7.01.03.01.013.00001 Isi Stapples 3 Pak 3,500 10,500

1.1.7.01.03.03.007.00001 Materai 4 Buah 4,000 16,000

1.1.7.01.03.03.007.00002 Materai 6 Buah 7,700 46,200

1.1.7.01.07.01.002.00003 Air Mineral 6 Botol 4,000 24,000

1.1.7.01.03.01.014.00062 Photo Copy 500 Lembar 300 150,000

283
KODE BARANG URAIAN KEGIATAN VOL. SATUAN HARGA SAT. HARGA

a b c d e f
9.1.2.10.07.01.001.00029 Sewa Panggung 25 m2 18,050 451,250

9.1.2.10.07.01.001.00048 Sewa Taman, Backdrop,dll 20 m2 300,000 6,000,000

9.1.2.10.07.01.001.00051 Sewa Umbul-umbul 10 Unit 24,900 249,000

9.1.2.10.07.01.001.00018 Sewa Sound System 1 Unit 5,810,150 5,810,150

1.1.7.01.03.01.014.00013 Cetak Brosur/Leaflet 2 Pak 640,550 1,281,100

1.1.7.01.03.01.014.00023 Cetak Poster 1 Rim 1,409,150 1,409,150

1.1.7.01.03.01.014.00066 Spanduk Print Digital 5 m2 25,750 128,750

1.1.7.01.03.01.014.00007 Cetak Backdrop/Banner 20 m2 32,200 644,000

1.3.5.02.03.01.004.00012 Hadiah Perlombaan Non Akademik Bidang 1 Paket 18,000,000 18,000,000


Seni Budaya Tingkat Kota
1.3.5.02.03.01.001.00040 Trophy Kaki Empat 1 Buah 439,300 439,300

1.3.5.02.03.01.001.00037 Trophy Kaki Empat 1 Buah 398,650 398,650

1.3.5.02.03.01.001.00035 Trophy Kaki Empat 1 Buah 371,550 371,550

1.1.7.01.07.01.001.00080 Nasi Kotak 240 Kotak 29,000 6,960,000

1.1.7.01.07.01.001.00086 Snack Kotak 240 Kotak 17,500 4,200,000

Total Biaya Tetap 46,729,850


Nilai ASB 53,229,850

3.02.01.02.03.003 Kegiatan Pagelaran / Festival / Pawai Tipe 3 Output Peserta

Spesifikasi Mengirim Delegasi, 1 Delegasi 40


Orang, Bersifat Lomba
Parameter
- Jumlah Hari (Wajib Diisi) 1 Hari
Biaya Tetap
1.1.7.01.03.01.014.00062 Photo Copy 300 Lembar 300 90,000

Total Biaya Tetap 90,000


Biaya Variabel
9.1.2.08.01.01.001.00010 Sewa Truk Angkutan Dalam Kota 1 Unit/Hari 539,200 539,200

9.1.2.10.07.01.001.00057 Sewa Dekorasi 30 m2 1,802,200 54,066,000

1.1.7.01.07.01.001.00080 Nasi Kotak 44 Kotak 29,000 1,276,000

1.1.7.01.07.01.001.00086 Snack Kotak 44 Kotak 17,500 770,000

1.1.7.01.07.01.002.00003 Air Mineral 44 Botol 4,000 176,000

Total Biaya Variabel 56,827,200


Nilai ASB 56,917,200

284
KODE BARANG URAIAN KEGIATAN VOL. SATUAN HARGA SAT. HARGA

a b c d e f

3.02.01.02.04 Kegiatan Pameran / Expo


3.02.01.02.04.001 Kegiatan Pameran / Expo Tipe 1 Output Peserta
Spesifikasi , Sebagai Penyelenggaraan, Lokasi
Acara (Asset Internal Pemkot), Maks.50 Stand
(3X3M) Peserta, Pelaksanaan Maks. 10 Hari

Parameter
- Jumlah Hari (Wajib Diisi) 1 Hari
Biaya Variabel Hononarium
1.10.28.02.02.002.002 Pembawa Acara 1 OH 250,000 250,000
1.10.28.02.02.002.003 Pembaca Doa 1 OH 200,000 200,000
1.10.28.02.02.002.038 Jasa Petugas Keamanan 4 OH 75,000 300,000
Total Biaya Variabel Honorarium 750,000
Biaya Tetap
1.1.7.01.03.02.001.00007 HVS 70 Gr 1 Rim 52,450 52,450

1.1.7.01.03.01.001.00002 BallPoint 5 Buah 12,150 60,750

1.1.7.01.03.01.003.00002 Binder Clip 1 Dus 4,150 4,150

1.1.7.01.03.01.006.00015 Stop Map 1 Buah 8,500 8,500

1.1.7.01.03.01.016.00001 Paper Clips 1 Buah 1,750 1,750

1.1.7.01.03.01.013.00001 Isi Stapples 3 Pak 3,500 10,500

1.1.7.01.03.01.006.00011 Snelhecter Map 50 Buah 2,800 140,000

1.1.7.01.03.03.007.00001 Materai 4 Buah 4,000 16,000

1.1.7.01.03.03.007.00002 Materai 6 Buah 7,700 46,200

1.1.7.01.03.01.014.00062 Photo Copy 500 Lembar 300 150,000

1.1.7.01.03.01.014.00013 Cetak Brosur/Leaflet 2 Pak 640,550 1,281,100

1.1.7.01.03.01.014.00023 Cetak Poster 1 Rim 1,409,150 1,409,150

1.1.7.01.03.01.014.00066 Spanduk Print Digital 5 m2 25,750 128,750

1.1.7.01.03.01.014.00007 Cetak Backdrop/Banner 20 m2 32,200 644,000

Total Biaya Tetap 3,953,300


Biaya Variabel
9.1.2.10.07.01.001.00036 Sewa Panggung 1 Unit/Hari 278,900 278,900

9.1.2.10.07.01.001.00048 Sewa Taman, Backdrop,dll 12 m2 300,000 3,600,000

9.1.2.10.07.01.001.00051 Sewa Umbul-umbul 8 Unit 24,900 199,200

9.1.2.10.07.01.001.00016 Sewa Sound System 1 Unit 4,067,150 4,067,150

285
KODE BARANG URAIAN KEGIATAN VOL. SATUAN HARGA SAT. HARGA

a b c d e f
1.1.7.01.07.01.001.00080 Nasi Kotak 110 Kotak 29,000 3,190,000

1.1.7.01.07.01.001.00086 Snack Kotak 110 Kotak 17,500 1,925,000

Total Biaya Variabel 13,260,250


Nilai ASB 17,963,550

3.02.01.02.04.002 Kegiatan Pameran / Expo Tipe 2 Output Peserta


Spesifikasi , Sebagai Penyelenggaraan, Lokasi
Acara (Eksternal Indoor), Maks.25 Stand
(3X3M)Peserta, Pelaksanaan Maks. 3 Hari

Parameter
- Jumlah Hari (Wajib Diisi) 1 Hari
Biaya Variabel Hononarium
1.10.28.02.02.002.002 Pembawa Acara 1 OH 250,000 250,000
1.10.28.02.02.002.003 Pembaca Doa 1 OH 200,000 200,000
1.10.28.02.02.002.038 Jasa Petugas Keamanan 4 OH 75,000 300,000
Total Biaya Variabel Honorarium 750,000
Biaya Tetap
1.1.7.01.03.02.001.00007 HVS 70 Gr 1 Rim 52,450 52,450

1.1.7.01.03.01.001.00002 BallPoint 5 Buah 12,150 60,750

1.1.7.01.03.01.003.00002 Binder Clip 1 Dus 4,150 4,150

1.1.7.01.03.01.006.00015 Stop Map 1 Buah 8,500 8,500

1.1.7.01.03.01.016.00001 Paper Clips 1 Buah 1,750 1,750

1.1.7.01.03.01.013.00001 Isi Stapples 3 Pak 3,500 10,500

1.1.7.01.03.01.006.00011 Snelhecter Map 2 Buah 2,800 5,600

1.1.7.01.03.03.007.00001 Materai 4 Buah 4,000 16,000

1.1.7.01.03.03.007.00002 Materai 6 Buah 7,700 46,200

1.1.7.01.03.01.014.00062 Photo Copy 500 Lembar 300 150,000

1.1.7.01.03.01.014.00013 Cetak Brosur/Leaflet 2 Pak 640,550 1,281,100

1.1.7.01.03.01.014.00023 Cetak Poster 1 Rim 1,409,150 1,409,150

1.1.7.01.03.01.014.00066 Spanduk Print Digital 5 m2 25,750 128,750

1.1.7.01.03.01.014.00007 Cetak Backdrop/Banner 20 m2 32,200 644,000

Total Biaya Tetap 3,818,900


Biaya Variabel
9.1.2.07.02.01.001.00023 Sewa Stand Pameran 225 m2/Hari 269,850 60,716,250

9.1.2.10.07.01.001.00036 Sewa Panggung 1 Unit/Hari 278,900 278,900

9.1.2.10.07.01.001.00048 Sewa Taman, Backdrop,dll 12 m2 300,000 3,600,000

286
KODE BARANG URAIAN KEGIATAN VOL. SATUAN HARGA SAT. HARGA

a b c d e f
9.1.2.10.07.01.001.00043 Sewa Podium Lengkap 1 Unit 264,400 264,400

9.1.2.10.07.01.001.00051 Sewa Umbul-umbul 8 Unit 24,900 199,200

9.1.2.10.07.01.001.00016 Sewa Sound System 1 Unit 4,067,150 4,067,150

1.1.7.01.07.01.001.00080 Nasi Kotak 55 Kotak 29,000 1,595,000

1.1.7.01.07.01.001.00086 Snack Kotak 55 Kotak 17,500 962,500

Total Biaya Variabel 71,683,400


Nilai ASB 76,252,300

3.02.01.02.04.003 Kegiatan Pameran / Expo Tipe 3 Output Peserta


Spesifikasi Sebagai Pengirim
Delegasi/Peserta, Skala Nasional
Parameter
- Jumlah Peserta (Wajib Diisi) 10 Orang
- Jumlah Hari (Wajib Diisi) 1 Hari
Biaya Tetap
1.1.7.01.03.01.014.00013 Cetak Brosur/Leaflet 2 Pak 640,550 1,281,100

1.1.7.01.03.01.014.00023 Cetak Poster 1 Rim 1,409,150 1,409,150

1.1.7.01.03.01.014.00066 Spanduk Print Digital 5 m2 25,750 128,750

1.1.7.01.03.01.014.00007 Cetak Backdrop/Banner 20 m2 32,200 644,000

9.1.2.07.02.01.001.00027 Sewa Stand 1 m2 40,671,050 40,671,050

9.1.2.10.07.01.001.00056 Sewa Dekorasi 15 m2 720,900 10,813,500

Total Biaya Tetap 54,947,550


Biaya Variabel
1.1.7.01.07.01.001.00080 Nasi Kotak 11 Kotak 29,000 319,000

1.1.7.01.07.01.001.00086 Snack Kotak 11 Kotak 17,500 192,500

Total Biaya Variabel 511,500


Nilai ASB 55,459,050

3.02.01.02.04.004 Kegiatan Pameran / Expo Tipe 4 Output Stand


SpesifikasiSebagai Pengirim Delegasi/Peserta,
Skala Regional, 1 stand 2 Orang

Parameter
- Jumlah Peserta (Wajib Diisi) 10 Orang
- Jumlah Stand (Wajib Diisi) 5 Stand
- Jumlah Hari (Wajib Diisi) 4 Hari
Biaya Tetap
1.1.7.01.03.01.014.00013 Cetak Brosur/Leaflet 2 Pak 640,550 1,281,100

1.1.7.01.03.01.014.00023 Cetak Poster 1 Rim 1,409,150 1,409,150

287
KODE BARANG URAIAN KEGIATAN VOL. SATUAN HARGA SAT. HARGA

a b c d e f
1.1.7.01.03.01.014.00066 Spanduk Print Digital 5 m2 25,750 128,750

1.1.7.01.03.01.014.00007 Cetak Backdrop/Banner 20 m2 32,200 644,000

9.1.2.10.07.01.001.00055 Sewa Dekorasi 6 m2 360,500 2,163,000

Total Biaya Tetap 5,626,000


Biaya Variabel
9.1.2.07.02.01.001.00023 Sewa Stand Pameran 20 m2/Hari 269,850 5,397,000

1.1.7.01.07.01.001.00080 Nasi Kotak 11 Kotak 29,000 319,000

1.1.7.01.07.01.001.00086 Snack Kotak 11 Kotak 17,500 192,500

Total Biaya Variabel 5,908,500


Nilai ASB 11,534,500

3.02.01.02.05 Kegiatan Lomba


3.02.01.02.05.001 Kegiatan Lomba Tipe 1 Output Peserta
Spesifikasi Skpd Selaku Penyelenggara, Lomba
Bersifat Olahraga (Satu Cabor) Peserta
Perorangan

Parameter
- Jumlah Peserta (Wajib Diisi) 30 Orang
- Jumlah Hari (Wajib Diisi) 2 Hari
- Jumlah Pertandingan (Wajib Diisi) 10 Pertandingan

Biaya Tetap
1.1.7.01.03.02.001.00007 HVS 70 Gr 1 Rim 52,450 52,450

1.1.7.01.03.01.001.00002 BallPoint 5 Buah 12,150 60,750

1.1.7.01.03.01.003.00002 Binder Clip 1 Dus 4,150 4,150

1.1.7.01.03.01.006.00015 Stop Map 1 Buah 8,500 8,500

1.1.7.01.03.01.016.00001 Paper Clips 1 Buah 1,750 1,750

1.1.7.01.03.01.013.00001 Isi Stapples 3 Pak 3,500 10,500

1.1.7.01.03.01.006.00011 Snelhecter Map 1 Buah 2,800 2,800

1.1.7.01.03.03.007.00001 Materai 4 Buah 4,000 16,000

1.1.7.01.03.03.007.00002 Materai 6 Buah 7,700 46,200

1.1.7.01.03.01.014.00062 Photo Copy 300 Lembar 300 90,000

1.1.7.01.03.01.014.00013 Cetak Brosur/Leaflet 2 Pak 640,550 1,281,100

1.1.7.01.03.01.014.00023 Cetak Poster 1 Rim 1,409,150 1,409,150

1.1.7.01.03.01.014.00066 Spanduk Print Digital 5 m2 25,750 128,750

1.1.7.01.03.01.014.00007 Cetak Backdrop/Banner 20 m2 32,200 644,000

288
KODE BARANG URAIAN KEGIATAN VOL. SATUAN HARGA SAT. HARGA

a b c d e f
1.3.5.02.03.01.004.00003 Hadiah Perlombaan Non Akademik Bidang 1 Paket 15,000,000 15,000,000
Olahraga Tingkat Kota
1.3.5.02.03.01.001.00040 Trophy Kaki Empat 1 Buah 439,300 439,300

1.3.5.02.03.01.001.00037 Trophy Kaki Empat 1 Buah 398,650 398,650

1.3.5.02.03.01.001.00035 Trophy Kaki Empat 1 Buah 371,550 371,550

Total Biaya Tetap 19,965,600


Biaya Variabel
1.10.28.02.02.004.005 Wasit Per Paket Pertandingan 10 Per 300,000 3,000,000
pertandingan

9.1.2.10.07.01.001.00036 Sewa Panggung 2 Unit/Hari 278,900 557,800

9.1.2.10.07.01.001.00048 Sewa Taman, Backdrop,dll 48 m2 300,000 14,400,000

9.1.2.10.07.01.001.00043 Sewa Podium Lengkap 2 Unit 264,400 528,800

9.1.2.10.07.01.001.00051 Sewa Umbul-umbul 40 Unit 24,900 996,000

9.1.2.10.07.01.001.00016 Sewa Sound System 4 Unit 4,067,150 16,268,600

1.1.7.01.07.01.001.00080 Nasi Kotak 66 Kotak 29,000 1,914,000

1.1.7.01.07.01.001.00086 Snack Kotak 66 Kotak 17,500 1,155,000

Total Biaya Variabel 38,820,200


Nilai ASB 58,785,800

3.02.01.02.05.002 Kegiatan Lomba Tipe 2 Output Peserta 59,725,250


Spesifikasi Skpd Selaku Penyelenggara Lomba
Bersifat Olahraga (Satu Cabor) Peserta
Kelompok, Max. 20 Orang/Kelompok

Parameter
- Jumlah Peserta (Wajib Diisi) 30 Kelompok
- Jumlah Hari (Wajib Diisi) 1 Hari
- Jumlah Pertandingan (Wajib Diisi) 10 Pertandingan

Biaya Tetap
1.1.7.01.03.02.001.00007 HVS 70 Gr 1 Rim 52,450 52,450

1.1.7.01.03.01.001.00002 BallPoint 5 Buah 12,150 60,750

1.1.7.01.03.01.003.00002 Binder Clip 1 Dus 4,150 4,150

1.1.7.01.03.01.006.00015 Stop Map 1 Buah 8,500 8,500

1.1.7.01.03.01.016.00001 Paper Clips 1 Buah 1,750 1,750

1.1.7.01.03.01.013.00001 Isi Stapples 3 Pak 3,500 10,500

1.1.7.01.03.01.006.00011 Snelhecter Map 1 Buah 2,800 2,800

1.1.7.01.03.03.007.00001 Materai 4 Buah 4,000 16,000

289
KODE BARANG URAIAN KEGIATAN VOL. SATUAN HARGA SAT. HARGA

a b c d e f
1.1.7.01.03.03.007.00002 Materai 6 Buah 7,700 46,200

1.1.7.01.03.01.014.00062 Photo Copy 500 Lembar 300 150,000

1.1.7.01.03.01.014.00013 Cetak Brosur/Leaflet 2 Pak 640,550 1,281,100

1.1.7.01.03.01.014.00023 Cetak Poster 1 Rim 1,409,150 1,409,150

1.1.7.01.03.01.014.00066 Spanduk Print Digital 5 m2 25,750 128,750

1.1.7.01.03.01.014.00007 Cetak Backdrop/Banner 20 m2 32,200 644,000

1.3.5.02.03.01.004.00006 Hadiah Perlombaan Non Akademik Bidang 1 Paket 30,000,000 30,000,000


Olahraga Tingkat Kota
1.3.5.02.03.01.001.00040 Trophy Kaki Empat 1 Buah 439,300 439,300

1.3.5.02.03.01.001.00037 Trophy Kaki Empat 1 Buah 398,650 398,650

1.3.5.02.03.01.001.00035 Trophy Kaki Empat 1 Buah 371,550 371,550

Total Biaya Tetap 35,025,600


Biaya Variabel
1.10.28.02.02.004.005 Wasit Per Paket Pertandingan 10 Per 300,000 3,000,000
pertandingan

9.1.2.10.07.01.001.00036 Sewa Panggung 1 Unit/Hari 278,900 278,900

9.1.2.10.07.01.001.00048 Sewa Taman, Backdrop,dll 12 m2 300,000 3,600,000

9.1.2.10.07.01.001.00043 Sewa Podium Lengkap 1 Unit 264,400 264,400

9.1.2.10.07.01.001.00051 Sewa Umbul-umbul 8 Unit 24,900 199,200

9.1.2.10.07.01.001.00016 Sewa Sound System 1 Unit 4,067,150 4,067,150

1.1.7.01.07.01.001.00080 Nasi Kotak 60 Kotak 29,000 1,740,000

1.1.7.01.07.01.001.00086 Snack Kotak 660 Kotak 17,500 11,550,000

Total Biaya Variabel 24,699,650


Nilai ASB 59,725,250

290
KODE BARANG URAIAN KEGIATAN VOL. SATUAN HARGA SAT. HARGA

a b c d e f

3.02.01.02.05.003 Kegiatan Lomba Tipe 3 Output Peserta


Spesifikasi Sebagai Pengirim Delegasi/Peserta

Parameter
- Jumlah Peserta (Wajib Diisi) 25 Orang
- Jumlah Pendamping (Wajib Diisi) 3 Orang
- Jumlah Hari (Wajib Diisi) 1 Hari
Biaya Variabel
1.10.28.02.02.002.005 Uang Saku Official 3 OH 200,000 600,000
1.10.28.02.02.002.004 Uang Saku Atlet 25 OH 100,000 2,500,000
9.1.2.07.02.01.001.00015 Penginapan Dalam Propinsi 14 Kamar/Hari 417,000 5,838,000

9.1.2.08.01.01.001.00043 Sewa Roda 6 / Bus 1 Hari 4,162,300 4,162,300

1.1.7.01.07.01.001.00080 Nasi Kotak 31 Kotak 29,000 893,200

1.1.7.01.07.01.001.00086 Snack Kotak 31 Kotak 17,500 539,000

Total Biaya Variabel 14,532,500


Nilai ASB 14,532,500

291
REKAP
ALOKASI BELANJA ASB NON FISIK
TAHUN ANGGARAN 2019
NO URAIAN NILAI ALOKASI

a b c d
3.02.01.01.01 Kegiatan Penelitian / Kajian
3.02.01.01.01.001 Kegiatan Penelitian / Kajian Tipe 1 56,287,500
Belanja Bahan Pakai Habis 1,226,500 2.18%
Belanja Cetak Dan Penggandaan 3,191,000 5.67%
Belanja Jasa Kantor 43,500,000 77.28%
Belanja Makanan Dan Minuman 8,370,000 14.87%
3.02.01.01.01.002 Kegiatan Penelitian / Kajian Tipe 2 76,612,500
Belanja Bahan Pakai Habis 1,226,500 1.60%
Belanja Cetak Dan Penggandaan 3,191,000 4.17%
Belanja Jasa Kantor 61,500,000 80.27%
Belanja Makanan Dan Minuman 10,695,000 13.96%

3.02.01.01.02 Kegiatan Penyusunan Rumusan Kebijakan


3.02.01.01.02.001 Kegiatan Penyusunan Rumusan Kebijakan Tipe 1 74,147,500
Belanja Bahan Pakai Habis 1,566,500 2.11%
Belanja Cetak Dan Penggandaan 1,841,000 2.48%
Belanja Jasa Kantor 54,000,000 72.83%
Belanja Makanan Dan Minuman 16,740,000 22.58%
3.02.01.01.02.002 Kegiatan Penyusunan Rumusan Kebijakan Tipe 2 183,147,500
Belanja Bahan Pakai Habis 1,906,500 1.04%
Belanja Cetak Dan Penggandaan 3,341,000 1.82%
Belanja Jasa Kantor 150,000,000 81.90%
Belanja Makanan Dan Minuman 27,900,000 15.23%

3.02.01.02.01 Kegiatan Sosialisasi / Penyuluhan


3.02.01.02.01.001 Kegiatan Sosialisasi / Penyuluhan Tipe 1 27,511,550
Belanja Bahan Pakai Habis 2,412,050 8.77%
Belanja Cetak Dan Penggandaan 1,167,500 4.24%
Belanja Honorarium Non Pegawai 700,000 2.54%
Belanja Jasa Kantor 7,450,000 27.08%
Belanja Makanan Dan Minuman 6,341,500 23.05%
Belanja Sewa Perlengkapan Dan Peralatan Kantor 1,631,100 5.93%
Belanja Sewa Rumah/Gedung/Gudang/Parkir 7,809,400 28.39%
3.02.01.02.01.002 Kegiatan Sosialisasi / Penyuluhan Tipe 2 15,788,250
Belanja Bahan Pakai Habis 1,796,050 11.38%
Belanja Cetak Dan Penggandaan 1,167,500 7.39%
Belanja Honorarium Non Pegawai 700,000 4.43%
Belanja Jasa Kantor 4,450,000 28.19%
Belanja Makanan Dan Minuman 2,557,500 16.20%
Belanja Sewa Perlengkapan Dan Peralatan Kantor 1,631,100 10.33%
Belanja Sewa Rumah/Gedung/Gudang/Parkir 3,486,100 22.08%
3.02.01.02.01.003 Kegiatan Sosialisasi / Penyuluhan Tipe 3 18,896,000
Belanja Bahan Pakai Habis 1,796,050 9.50%
Belanja Cetak Dan Penggandaan 1,167,500 6.18%
Belanja Honorarium Non Pegawai 700,000 3.70%
Belanja Jasa Kantor 4,050,000 21.43%
Belanja Makanan Dan Minuman 2,557,500 13.53%
Belanja Perjalanan Dinas 4,000,000 21.17%
Belanja Sewa Perlengkapan Dan Peralatan Kantor 1,138,850 6.03%
Belanja Sewa Rumah/Gedung/Gudang/Parkir 3,486,100 18.45%

3.02.01.02.02 Kegiatan Pelatihan / Bimtek / Workshop


3.02.01.02.02.001 Kegiatan Pelatihan / Bimtek / Workshop Tipe 1 25,499,450
Belanja Bahan Pakai Habis 1,812,050 7.11%
Belanja Bahan/Material 5,211,250 20.44%
Belanja Cetak Dan Penggandaan 300,000 1.18%
Belanja Jasa Kantor 10,500,000 41.18%
Belanja Makanan Dan Minuman 6,341,500 24.87%
Belanja Sewa Perlengkapan Dan Peralatan Kantor 1,334,650 5.23%
3.02.01.02.02.002 Kegiatan Pelatihan / Bimtek / Workshop Tipe 2 23,509,300

292
NO URAIAN NILAI ALOKASI

a b c d
Belanja Bahan Pakai Habis 1,812,050 7.71%
Belanja Bahan/Material 4,235,000 18.01%
Belanja Cetak Dan Penggandaan 300,000 1.28%
Belanja Jasa Kantor 6,000,000 25.52%
Belanja Makanan Dan Minuman 6,341,500 26.97%
Belanja Sewa Perlengkapan Dan Peralatan Kantor 1,334,650 5.68%
Belanja Sewa Rumah/Gedung/Gudang/Parkir 3,486,100 14.83%
3.02.01.02.02.003 Kegiatan Pelatihan / Bimtek / Workshop Tipe 3 16,816,100
Belanja Bahan Pakai Habis 2,582,050 15.35%
Belanja Cetak Dan Penggandaan 300,000 1.78%
Belanja Jasa Kantor 6,000,000 35.68%
Belanja Makanan Dan Minuman 2,557,500 15.21%
Belanja Perjalanan Dinas 4,400,000 26.17%
Belanja Sewa Perlengkapan Dan Peralatan Kantor 976,550 5.81%
3.02.01.02.02.004 Kegiatan Pelatihan / Bimtek / Workshop Tipe 4 20,427,900
Belanja Bahan Pakai Habis 2,582,050 12.64%
Belanja Cetak Dan Penggandaan 300,000 1.47%
Belanja Jasa Kantor 6,000,000 29.37%
Belanja Makanan Dan Minuman 2,557,500 12.52%
Belanja Perjalanan Dinas 4,400,000 21.54%
Belanja Sewa Perlengkapan Dan Peralatan Kantor 1,102,250 5.40%
Belanja Sewa Rumah/Gedung/Gudang/Parkir 3,486,100 17.07%

3.02.01.02.03 Kegiatan Pagelaran / Festival / Pawai


3.02.01.02.03.001 Kegiatan Pagelaran / Festival / Pawai Tipe 1 58,277,350
Belanja Bahan Pakai Habis 985,700 1.69%
Belanja Cetak Dan Penggandaan 2,840,250 4.87%
Belanja Jasa Kantor 7,709,500 13.23%
Belanja Makanan Dan Minuman 4,209,000 7.22%
Belanja Sewa Perlengkapan Dan Peralatan Kantor 30,532,900 52.39%
Uang Untuk Diberikan Kepada Pihak Ketiga/Masyarakat 12,000,000 20.59%
3.02.01.02.03.002 Kegiatan Pagelaran / Festival / Pawai Tipe 2 53,229,850
Belanja Bahan Pakai Habis 985,700 1.85%
Belanja Cetak Dan Penggandaan 2,840,250 5.34%
Belanja Jasa Kantor 7,709,500 14.48%
Belanja Makanan Dan Minuman 11,184,000 21.01%
Belanja Sewa Perlengkapan Dan Peralatan Kantor 12,510,400 23.50%
Uang Untuk Diberikan Kepada Pihak Ketiga/Masyarakat 18,000,000 33.82%
3.02.01.02.03.003 Kegiatan Pagelaran / Festival / Pawai Tipe 3 56,917,200
Belanja Cetak Dan Penggandaan 90,000 0.16%
Belanja Makanan Dan Minuman 2,222,000 3.90%
Belanja Sewa Perlengkapan Dan Peralatan Kantor 54,066,000 94.99%
Belanja Sewa Sarana Mobilitas 539,200 0.95%

3.02.01.02.04 Kegiatan Pameran / Expo


3.02.01.02.04.001 Kegiatan Pameran / Expo Tipe 1 17,963,550
Belanja Bahan Pakai Habis 1,312,250 7.31%
Belanja Cetak Dan Penggandaan 2,840,250 15.81%
Belanja Jasa Kantor 750,000 4.18%
Belanja Makanan Dan Minuman 5,115,000 28.47%
Belanja Sewa Perlengkapan Dan Peralatan Kantor 7,946,050 44.23%
3.02.01.02.04.002 Kegiatan Pameran / Expo Tipe 2 76,252,300
Belanja Bahan Pakai Habis 1,177,850 1.54%
Belanja Cetak Dan Penggandaan 2,840,250 3.72%
Belanja Jasa Kantor 750,000 0.98%
Belanja Makanan Dan Minuman 2,557,500 3.35%
Belanja Sewa Perlengkapan Dan Peralatan Kantor 68,926,700 90.39%
3.02.01.02.04.003 Kegiatan Pameran / Expo Tipe 3 55,459,050
Belanja Bahan Pakai Habis 772,750 1.39%
Belanja Cetak Dan Penggandaan 2,690,250 4.85%
Belanja Makanan Dan Minuman 511,500 0.92%
Belanja Sewa Perlengkapan Dan Peralatan Kantor 51,484,550 92.83%
3.02.01.02.04.004 Kegiatan Pameran / Expo Tipe 4 6,407,350
Belanja Bahan Pakai Habis 772,750 12.06%

293
NO URAIAN NILAI ALOKASI

a b c d
Belanja Cetak Dan Penggandaan 2,690,250 41.99%
Belanja Makanan Dan Minuman 511,500 7.98%
Belanja Sewa Perlengkapan Dan Peralatan Kantor 2,432,850 37.97%

3.02.01.02.05 Kegiatan Lomba


3.02.01.02.05.001 Kegiatan Lomba Tipe 1 58,785,800
Belanja Bahan Pakai Habis 1,971,850 3.35%
Belanja Cetak Dan Penggandaan 2,780,250 4.73%
Belanja Jasa Kantor 4,209,500 7.16%
Belanja Makanan Dan Minuman 3,069,000 5.22%
Belanja Sewa Perlengkapan Dan Peralatan Kantor 31,755,200 54.02%
Uang Untuk Diberikan Kepada Pihak Ketiga/Masyarakat 15,000,000 25.52%
3.02.01.02.05.002 Kegiatan Lomba Tipe 2 59,725,250
Belanja Bahan Pakai Habis 1,175,050 1.97%
Belanja Cetak Dan Penggandaan 2,840,250 4.76%
Belanja Jasa Kantor 4,209,500 7.05%
Belanja Makanan Dan Minuman 13,290,000 22.25%
Belanja Sewa Perlengkapan Dan Peralatan Kantor 8,210,450 13.75%
Uang Untuk Diberikan Kepada Pihak Ketiga/Masyarakat 30,000,000 50.23%
3.02.01.02.05.003 Kegiatan Lomba Tipe 3 14,532,500
Belanja Jasa Kantor 3,100,000 21.33%
Belanja Makanan Dan Minuman 1,432,200 9.86%
Belanja Sewa Rumah/Gedung/Gudang/Parkir 5,838,000 40.17%
Belanja Sewa Sarana Mobilitas 4,162,300 28.64%

294
PEMERINTAH KOTA

MOJOKERTO
2019

STANDAR
BIAYA UMUM

ANALISIS STANDAR BELANJA


(A S B )
STANDAR BIAYA UMUM ( SBU )
PEMERINTAH KOTA MOJOKERTO
TAHUN ANGGARAN 2019

KODE URAIAN SPESIFIKASI SAT. HARGA SAT.


a b c d e
1.10 Standart Biaya Umum
1.10.28 Satuan Honorarium, Upah/Jasa, Biaya
Operasional
1.10.28.01 Honorarium Umum
1.10.28.01.01 Honorarium Penanggungjawab
Pengelola Keuangan / Pengelola
Barang
1.10.28.01.01.001 Honorarium Penanggung Jawab
Pengelola/Pengguna Barang

1.10.28.01.01.001.001 Pengelola Barang Honorarium Penanggung Jawab OB 2,000,000


Pengelola Barang
1.10.28.01.01.001.002 Pengurus Barang Pengelola Honorarium Penanggung Jawab OB 950,000
Pengelola Barang
1.10.28.01.01.001.003 Pembantu Pengurus Barang Pengelola Honorarium Penanggung Jawab OB 850,000
Pengelola Barang
1.10.28.01.01.001.004 Pengurus Barang Pengguna Honorarium Penanggung Jawab OB 400,000
Pengguna Barang
1.10.28.01.01.001.005 Pembantu Pengurus Barang Pengguna Honorarium Penanggung Jawab OB 300,000
Pengguna Barang
1.10.28.01.01.002 Honorarium Pejabat Pengelola
Keuangan Daerah (PPKD)/ Pejabat
Penatausahaan Barang/Pengelola

1.10.28.01.01.002.001 PPKD/PPB/Pengelola Honorarium Pejabat Pengelola OB 1,875,000


Keuangan Daerah (PPKD)/ Pejabat
Penatausahaan Barang/Pengelola
1.10.28.01.01.003 Honorarium Pengguna Anggaran /
Pengguna Barang ( PA / PB )

1.10.28.01.01.003.001 Honorarium Pengguna Anggaran / Nilai pagu dana sd. Rp. 100 juta OB 325,000
Pengguna Barang ( PA / PB )
1.10.28.01.01.003.002 Honorarium Pengguna Anggaran / Nilai pagu dana di atas Rp. 100 juta sd. OB 400,000
Pengguna Barang ( PA / PB ) Rp. 250 juta
1.10.28.01.01.003.003 Honorarium Pengguna Anggaran / Nilai pagu dana di atas Rp. 250 juta sd. OB 450,000
Pengguna Barang ( PA / PB ) Rp. 500 juta
1.10.28.01.01.003.004 Honorarium Pengguna Anggaran / Nilai pagu dana di atas Rp. 500 juta sd. OB 525,000
Pengguna Barang ( PA / PB ) Rp. 1 miliar
1.10.28.01.01.003.005 Honorarium Pengguna Anggaran / Nilai pagu dana di atas Rp. 1 miliar sd. OB 600,000
Pengguna Barang ( PA / PB ) Rp. 2,5 miliar
1.10.28.01.01.003.006 Honorarium Pengguna Anggaran / Nilai pagu dana di atas Rp. 2,5 miliar sd. OB 700,000
Pengguna Barang ( PA / PB ) Rp. 5 miliar
1.10.28.01.01.003.007 Honorarium Pengguna Anggaran / Nilai pagu dana di atas Rp. 5 miliar sd. OB 800,000
Pengguna Barang ( PA / PB ) Rp. 10 miliar
1.10.28.01.01.003.008 Honorarium Pengguna Anggaran / Nilai pagu dana di atas Rp. 10 miliar sd. OB 1,000,000
Pengguna Barang ( PA / PB ) Rp. 25 miliar
1.10.28.01.01.003.009 Honorarium Pengguna Anggaran / Nilai pagu dana di atas Rp. 25 miliar sd. OB 1,200,000
Pengguna Barang ( PA / PB ) Rp. 50 miliar
1.10.28.01.01.003.010 Honorarium Pengguna Anggaran / Nilai pagu dana di atas Rp. 50 miliar sd. OB 1,400,000
Pengguna Barang ( PA / PB ) Rp.75 miliar
1.10.28.01.01.003.011 Honorarium Pengguna Anggaran / Nilai pagu dana di atas Rp.75 miliar sd. OB 1,625,000
Pengguna Barang ( PA / PB ) Rp.100 miliar
1.10.28.01.01.003.012 Honorarium Pengguna Anggaran / Nilai pagu dana di atas Rp.100 miliar sd. OB 1,925,000
Pengguna Barang ( PA / PB ) Rp. 250 miliar
1.10.28.01.01.003.013 Honorarium Pengguna Anggaran / Nilai pagu dana di atas Rp. 250 miliar OB 2,250,000
Pengguna Barang ( PA / PB ) sd. Rp. 500 miliar
1.10.28.01.01.003.014 Honorarium Pengguna Anggaran / Nilai pagu dana di atas Rp. 500 miliar OB 2,550,000
Pengguna Barang ( PA / PB ) sd. Rp. 750 miliar
1.10.28.01.01.003.015 Honorarium Pengguna Anggaran / Nilai pagu dana di atas Rp. 750 miliar OB 2,900,000
Pengguna Barang ( PA / PB ) sd. Rp. 1 triliun

295
KODE URAIAN SPESIFIKASI SAT. HARGA SAT.
a b c d e
1.10.28.01.01.003.016 Honorarium Pengguna Anggaran / Nilai pagu dana di atas Rp. 1 triliun OB 3,500,000
Pengguna Barang ( PA / PB )
1.10.28.01.01.004 Honorarium Kuasa Pengguna Anggaran
/ Kuasa Pengguna Barang (KPA/KPB)

1.10.28.01.01.004.001 Honorarium Kuasa Pengguna Anggaran Nilai pagu dana sd. Rp. 100 juta OB 300,000
/ Kuasa Pengguna Barang (KPA/KPB)

1.10.28.01.01.004.002 Honorarium Kuasa Pengguna Anggaran Nilai pagu dana di atas Rp. 100 juta sd. OB 375,000
/ Kuasa Pengguna Barang (KPA/KPB) Rp. 250 juta

1.10.28.01.01.004.003 Honorarium Kuasa Pengguna Anggaran Nilai pagu dana di atas Rp. 250 juta sd. OB 450,000
/ Kuasa Pengguna Barang (KPA/KPB) Rp. 500 juta

1.10.28.01.01.004.004 Honorarium Kuasa Pengguna Anggaran Nilai pagu dana di atas Rp. 500 juta sd. OB 525,000
/ Kuasa Pengguna Barang (KPA/KPB) Rp. 1 miliar

1.10.28.01.01.004.005 Honorarium Kuasa Pengguna Anggaran Nilai pagu dana di atas Rp. 1 miliar sd. OB 600,000
/ Kuasa Pengguna Barang (KPA/KPB) Rp. 2,5 miliar

1.10.28.01.01.004.006 Honorarium Kuasa Pengguna Anggaran Nilai pagu dana di atas Rp. 2,5 miliar sd. OB 700,000
/ Kuasa Pengguna Barang (KPA/KPB) Rp. 5 miliar

1.10.28.01.01.004.007 Honorarium Kuasa Pengguna Anggaran Nilai pagu dana di atas Rp. 5 miliar sd. OB 750,000
/ Kuasa Pengguna Barang (KPA/KPB) Rp. 10 miliar

1.10.28.01.01.004.008 Honorarium Kuasa Pengguna Anggaran Nilai pagu dana di atas Rp. 10 miliar sd. OB 975,000
/ Kuasa Pengguna Barang (KPA/KPB) Rp. 25 miliar

1.10.28.01.01.004.009 Honorarium Kuasa Pengguna Anggaran Nilai pagu dana di atas Rp. 25 miliar sd. OB 1,150,000
/ Kuasa Pengguna Barang (KPA/KPB) Rp. 50 miliar

1.10.28.01.01.004.010 Honorarium Kuasa Pengguna Anggaran Nilai pagu dana di atas Rp. 50 miliar sd. OB 1,375,000
/ Kuasa Pengguna Barang (KPA/KPB) Rp.75 miliar

1.10.28.01.01.004.011 Honorarium Kuasa Pengguna Anggaran Nilai pagu dana di atas Rp.75 miliar sd. OB 1,600,000
/ Kuasa Pengguna Barang (KPA/KPB) Rp. 100 miliar

1.10.28.01.01.004.012 Honorarium Kuasa Pengguna Anggaran Nilai pagu dana di atas Rp.100 miliar sd. OB 1,875,000
/ Kuasa Pengguna Barang (KPA/KPB) Rp. 250 miliar

1.10.28.01.01.004.013 Honorarium Kuasa Pengguna Anggaran Nilai pagu dana di atas Rp. 250 miliar OB 2,200,000
/ Kuasa Pengguna Barang (KPA/KPB) sd. Rp. 500 miliar

1.10.28.01.01.004.014 Honorarium Kuasa Pengguna Anggaran Nilai pagu dana di atas Rp. 500 miliar OB 2,500,000
/ Kuasa Pengguna Barang (KPA/KPB) sd. Rp. 750 miliar

1.10.28.01.01.004.015 Honorarium Kuasa Pengguna Anggaran Nilai pagu dana di atas Rp. 750 miliar OB 2,825,000
/ Kuasa Pengguna Barang (KPA/KPB) sd. Rp. 1 triliun

1.10.28.01.01.004.016 Honorarium Kuasa Pengguna Anggaran Nilai pagu dana di atas Rp. 1 triliun OB 3,400,000
/ Kuasa Pengguna Barang (KPA/KPB)

1.10.28.01.01.005 Honorarium Pejabat Pembuat


Komitmen (PPK) - (Diberikan tiap bulan
per paket pekerjaan selama masa
pelaksanaan pekerjaan)

1.10.28.01.01.005.001 Honorarium Pejabat Pembuat Nilai pagu dana sd. Rp. 100 juta OB 600,000
Komitmen (PPK)
1.10.28.01.01.005.002 Honorarium Pejabat Pembuat Nilai pagu dana di atas Rp. 100 juta sd. OB 737,500
Komitmen (PPK) Rp. 250 juta
1.10.28.01.01.005.003 Honorarium Pejabat Pembuat Nilai pagu dana di atas Rp. 250 juta sd. OB 875,000
Komitmen (PPK) Rp. 500 juta

296
KODE URAIAN SPESIFIKASI SAT. HARGA SAT.
a b c d e
1.10.28.01.01.005.004 Honorarium Pejabat Pembuat Nilai pagu dana di atas Rp. 500 juta sd. OB 1,000,000
Komitmen (PPK) Rp. 1 miliar
1.10.28.01.01.005.005 Honorarium Pejabat Pembuat Nilai pagu dana di atas Rp. 1 miliar sd. OB 1,175,000
Komitmen (PPK) Rp. 2,5 miliar
1.10.28.01.01.005.006 Honorarium Pejabat Pembuat Nilai pagu dana di atas Rp. 2,5 miliar sd. OB 1,337,500
Komitmen (PPK) Rp. 5 miliar
1.10.28.01.01.005.007 Honorarium Pejabat Pembuat Nilai pagu dana di atas Rp. 5 miliar sd. OB 1,387,500
Komitmen (PPK) Rp. 10 miliar
1.10.28.01.01.005.008 Honorarium Pejabat Pembuat Nilai pagu dana di atas Rp. 10 miliar sd. OB 1,912,500
Komitmen (PPK) Rp. 25 miliar
1.10.28.01.01.005.009 Honorarium Pejabat Pembuat Nilai pagu dana di atas Rp. 25 miliar sd. OB 2,312,500
Komitmen (PPK) Rp. 50 miliar
1.10.28.01.01.005.010 Honorarium Pejabat Pembuat Nilai pagu dana di atas Rp. 50 miliar sd. OB 2,712,500
Komitmen (PPK) Rp.75 miliar
1.10.28.01.01.005.011 Honorarium Pejabat Pembuat Nilai pagu dana di atas Rp.75 miliar sd. OB 3,112,500
Komitmen (PPK) Rp. 100 miliar
1.10.28.01.01.005.012 Honorarium Pejabat Pembuat Nilai pagu dana di atas Rp.100 miliar sd. OB 3,725,000
Komitmen (PPK) Rp. 250 miliar
1.10.28.01.01.005.013 Honorarium Pejabat Pembuat Nilai pagu dana di atas Rp. 250 miliar OB 4,325,000
Komitmen (PPK) sd. Rp. 500 miliar
1.10.28.01.01.005.014 Honorarium Pejabat Pembuat Nilai pagu dana di atas Rp. 500 miliar OB 4,925,000
Komitmen (PPK) sd. Rp. 750 miliar
1.10.28.01.01.005.015 Honorarium Pejabat Pembuat Nilai pagu dana di atas Rp. 750 miliar OB 5,537,500
Komitmen (PPK) sd. Rp. 1 triliun
1.10.28.01.01.005.016 Honorarium Pejabat Pembuat Nilai pagu dana di atas Rp. 1 triliun OB 6,737,500
Komitmen (PPK)
1.10.28.01.01.006 Honorarium Pejabat Penguji Tagihan
dan Penandatangan Surat Perintah
Membayar
1.10.28.01.01.006.001 Honorarium Pejabat Penguji Tagihan Nilai pagu dana sd. Rp. 100 juta OB 200,000
dan Penandatangan Surat Perintah
Membayar
1.10.28.01.01.006.002 Honorarium Pejabat Penguji Tagihan Nilai pagu dana di atas Rp. 100 juta sd. OB 240,000
dan Penandatangan Surat Perintah Rp. 250 juta
Membayar
1.10.28.01.01.006.003 Honorarium Pejabat Penguji Tagihan Nilai pagu dana di atas Rp. 250 juta sd. OB 285,000
dan Penandatangan Surat Perintah Rp. 500 juta
Membayar
1.10.28.01.01.006.004 Honorarium Pejabat Penguji Tagihan Nilai pagu dana di atas Rp. 500 juta sd. OB 330,000
dan Penandatangan Surat Perintah Rp. 1 miliar
Membayar
1.10.28.01.01.006.005 Honorarium Pejabat Penguji Tagihan Nilai pagu dana di atas Rp. 1 miliar sd. OB 385,000
dan Penandatangan Surat Perintah Rp. 2,5 miliar
Membayar
1.10.28.01.01.006.006 Honorarium Pejabat Penguji Tagihan Nilai pagu dana di atas Rp. 2,5 miliar sd. OB 440,000
dan Penandatangan Surat Perintah Rp. 5 miliar
Membayar
1.10.28.01.01.006.007 Honorarium Pejabat Penguji Tagihan Nilai pagu dana di atas Rp. 5 miliar sd. OB 495,000
dan Penandatangan Surat Perintah Rp. 10 miliar
Membayar
1.10.28.01.01.006.008 Honorarium Pejabat Penguji Tagihan Nilai pagu dana di atas Rp. 10 miliar sd. OB 625,000
dan Penandatangan Surat Perintah Rp. 25 miliar
Membayar
1.10.28.01.01.006.009 Honorarium Pejabat Penguji Tagihan Nilai pagu dana di atas Rp. 25 miliar sd. OB 760,000
dan Penandatangan Surat Perintah Rp. 50 miliar
Membayar
1.10.28.01.01.006.010 Honorarium Pejabat Penguji Tagihan Nilai pagu dana di atas Rp. 50 miliar sd. OB 890,000
dan Penandatangan Surat Perintah Rp.75 miliar
Membayar
1.10.28.01.01.006.011 Honorarium Pejabat Penguji Tagihan Nilai pagu dana di atas Rp.75 miliar sd. OB 1,020,000
dan Penandatangan Surat Perintah Rp. 100 miliar
Membayar
1.10.28.01.01.006.012 Honorarium Pejabat Penguji Tagihan Nilai pagu dana di atas Rp. 100 miliar OB 1,220,000
dan Penandatangan Surat Perintah sd. Rp. 250 miliar
Membayar

297
KODE URAIAN SPESIFIKASI SAT. HARGA SAT.
a b c d e
1.10.28.01.01.006.013 Honorarium Pejabat Penguji Tagihan Nilai pagu dana di atas Rp. 250 miliar OB 1,415,000
dan Penandatangan Surat Perintah sd. Rp. 500 miliar
Membayar
1.10.28.01.01.006.014 Honorarium Pejabat Penguji Tagihan Nilai pagu dana di atas Rp. 500 miliar OB 1,615,000
dan Penandatangan Surat Perintah sd. Rp. 750 miliar
Membayar
1.10.28.01.01.006.015 Honorarium Pejabat Penguji Tagihan Nilai pagu dana di atas Rp. 750 miliar OB 1,810,000
dan Penandatangan Surat Perintah sd. Rp. 1 triliun
Membayar
1.10.28.01.01.006.016 Honorarium Pejabat Penguji Tagihan Nilai pagu dana di atas Rp. 1 triliun OB 2,210,000
dan Penandatangan Surat Perintah
Membayar
1.10.28.01.01.007 Honorarium Pejabat Pelaksana Teknis
Kegiatan (PPTK) - (Diberikan tiap bulan
per rekening kegiatan selama masa
pelaksanaan pekerjaan)

1.10.28.01.01.007.001 Honorarium Pejabat Pelaksana Teknis Nilai pagu dana sd. Rp. 100 juta OK 462,500
Kegiatan (PPTK)
1.10.28.01.01.007.002 Honorarium Pejabat Pelaksana Teknis Nilai pagu dana di atas Rp. 100 juta sd. OK 575,000
Kegiatan (PPTK) Rp. 250 juta
1.10.28.01.01.007.003 Honorarium Pejabat Pelaksana Teknis Nilai pagu dana di atas Rp. 250 juta sd. OK 700,000
Kegiatan (PPTK) Rp. 500 juta
1.10.28.01.01.007.004 Honorarium Pejabat Pelaksana Teknis Nilai pagu dana di atas Rp. 500 juta sd. OK 812,500
Kegiatan (PPTK) Rp. 1 miliar
1.10.28.01.01.007.005 Honorarium Pejabat Pelaksana Teknis Nilai pagu dana di atas Rp. 1 miliar sd. OK 900,000
Kegiatan (PPTK) Rp. 2,5 miliar
1.10.28.01.01.007.006 Honorarium Pejabat Pelaksana Teknis Nilai pagu dana di atas Rp. 2,5 miliar sd. OK 1,037,500
Kegiatan (PPTK) Rp. 5 miliar
1.10.28.01.01.007.007 Honorarium Pejabat Pelaksana Teknis Nilai pagu dana di atas Rp. 5 miliar sd. OK 1,187,500
Kegiatan (PPTK) Rp. 10 miliar
1.10.28.01.01.007.008 Honorarium Pejabat Pelaksana Teknis Nilai pagu dana di atas Rp. 10 miliar sd. OK 1,487,500
Kegiatan (PPTK) Rp. 25 miliar
1.10.28.01.01.007.009 Honorarium Pejabat Pelaksana Teknis Nilai pagu dana di atas Rp. 25 miliar sd. OK 1,887,500
Kegiatan (PPTK) Rp. 50 miliar
1.10.28.01.01.007.010 Honorarium Pejabat Pelaksana Teknis Nilai pagu dana di atas Rp. 50 miliar sd. OK 2,237,500
Kegiatan (PPTK) Rp.75 miliar
1.10.28.01.01.007.011 Honorarium Pejabat Pelaksana Teknis Nilai pagu dana di atas Rp.75 miliar sd. OK 2,587,500
Kegiatan (PPTK) Rp. 100 miliar
1.10.28.01.01.007.012 Honorarium Pejabat Pelaksana Teknis Nilai pagu dana di atas Rp. 100 miliar OK 3,112,500
Kegiatan (PPTK) sd. Rp. 250 miliar
1.10.28.01.01.007.013 Honorarium Pejabat Pelaksana Teknis Nilai pagu dana di atas Rp. 250 miliar OK 3,637,500
Kegiatan (PPTK) sd. Rp. 500 miliar
1.10.28.01.01.007.014 Honorarium Pejabat Pelaksana Teknis Nilai pagu dana di atas Rp. 500 miliar OK 4,162,500
Kegiatan (PPTK) sd. Rp. 750 miliar
1.10.28.01.01.007.015 Honorarium Pejabat Pelaksana Teknis Nilai pagu dana di atas Rp. 750 miliar OK 4,625,000
Kegiatan (PPTK) sd. Rp. 1 triliun
1.10.28.01.01.007.016 Honorarium Pejabat Pelaksana Teknis Nilai pagu dana di atas Rp. 1 triliun OK 5,675,000
Kegiatan (PPTK)
1.10.28.01.01.008 Honorarium Pejabat Penatausahaan
Keuangan (PPK-SKPD/PPK-PPKD)

1.10.28.01.01.008.001 Honorarium Pejabat Penatausahaan Nilai pagu dana sd. Rp. 100 juta OB 250,000
Keuangan (PPK-SKPD/PPK-PPKD)

1.10.28.01.01.008.002 Honorarium Pejabat Penatausahaan Nilai pagu dana di atas Rp. 100 juta sd. OB 300,000
Keuangan (PPK-SKPD/PPK-PPKD) Rp. 250 juta

1.10.28.01.01.008.003 Honorarium Pejabat Penatausahaan Nilai pagu dana di atas Rp. 250 juta sd. OB 350,000
Keuangan (PPK-SKPD/PPK-PPKD) Rp. 500 juta

1.10.28.01.01.008.004 Honorarium Pejabat Penatausahaan Nilai pagu dana di atas Rp. 500 juta sd. OB 400,000
Keuangan (PPK-SKPD/PPK-PPKD) Rp. 1 miliar

298
KODE URAIAN SPESIFIKASI SAT. HARGA SAT.
a b c d e
1.10.28.01.01.008.005 Honorarium Pejabat Penatausahaan Nilai pagu dana di atas Rp. 1 miliar sd. OB 500,000
Keuangan (PPK-SKPD/PPK-PPKD) Rp. 2,5 miliar

1.10.28.01.01.008.006 Honorarium Pejabat Penatausahaan Nilai pagu dana di atas Rp. 2,5 miliar sd. OB 550,000
Keuangan (PPK-SKPD/PPK-PPKD) Rp. 5 miliar

1.10.28.01.01.008.007 Honorarium Pejabat Penatausahaan Nilai pagu dana di atas Rp. 5 miliar sd. OB 625,000
Keuangan (PPK-SKPD/PPK-PPKD) Rp. 10 miliar

1.10.28.01.01.008.008 Honorarium Pejabat Penatausahaan Nilai pagu dana di atas Rp. 10 miliar sd. OB 800,000
Keuangan (PPK-SKPD/PPK-PPKD) Rp. 25 miliar

1.10.28.01.01.008.009 Honorarium Pejabat Penatausahaan Nilai pagu dana di atas Rp. 25 miliar sd. OB 950,000
Keuangan (PPK-SKPD/PPK-PPKD) Rp. 50 miliar

1.10.28.01.01.008.010 Honorarium Pejabat Penatausahaan Nilai pagu dana di atas Rp. 50 miliar sd. OB 1,125,000
Keuangan (PPK-SKPD/PPK-PPKD) Rp.75 miliar

1.10.28.01.01.008.011 Honorarium Pejabat Penatausahaan Nilai pagu dana di atas Rp.75 miliar sd. OB 1,275,000
Keuangan (PPK-SKPD/PPK-PPKD) Rp. 100 miliar

1.10.28.01.01.008.012 Honorarium Pejabat Penatausahaan Nilai pagu dana di atas Rp. 100 miliar OB 1,525,000
Keuangan (PPK-SKPD/PPK-PPKD) sd. Rp. 250 miliar

1.10.28.01.01.008.013 Honorarium Pejabat Penatausahaan Nilai pagu dana di atas Rp. 250 miliar OB 1,800,000
Keuangan (PPK-SKPD/PPK-PPKD) sd. Rp. 500 miliar

1.10.28.01.01.008.014 Honorarium Pejabat Penatausahaan Nilai pagu dana di atas Rp. 500 miliar OB 2,000,000
Keuangan (PPK-SKPD/PPK-PPKD) sd. Rp. 750 miliar

1.10.28.01.01.008.015 Honorarium Pejabat Penatausahaan Nilai pagu dana di atas Rp. 750 miliar OB 2,250,000
Keuangan (PPK-SKPD/PPK-PPKD) sd. Rp. 1 triliun

1.10.28.01.01.008.016 Honorarium Pejabat Penatausahaan Nilai pagu dana di atas Rp. 1 triliun OB 2,750,000
Keuangan (PPK-SKPD/PPK-PPKD)

1.10.28.01.01.008 Honorarium Bendahara Pengeluaran

1.10.28.01.01.008.001 Honorarium Bendahara Pengeluaran Nilai pagu dana sd. Rp. 100 juta OB 225,000

1.10.28.01.01.008.002 Honorarium Bendahara Pengeluaran Nilai pagu dana di atas Rp. 100 juta sd. OB 275,000
Rp. 250 juta
1.10.28.01.01.008.003 Honorarium Bendahara Pengeluaran Nilai pagu dana di atas Rp. 250 juta sd. OB 325,000
Rp. 500 juta
1.10.28.01.01.008.004 Honorarium Bendahara Pengeluaran Nilai pagu dana di atas Rp. 500 juta sd. OB 350,000
Rp. 1 miliar
1.10.28.01.01.008.005 Honorarium Bendahara Pengeluaran Nilai pagu dana di atas Rp. 1 miliar sd. OB 425,000
Rp. 2,5 miliar
1.10.28.01.01.008.006 Honorarium Bendahara Pengeluaran Nilai pagu dana di atas Rp. 2,5 miliar sd. OB 500,000
Rp. 5 miliar
1.10.28.01.01.008.007 Honorarium Bendahara Pengeluaran Nilai pagu dana di atas Rp. 5 miliar sd. OB 550,000
Rp. 10 miliar
1.10.28.01.01.008.008 Honorarium Bendahara Pengeluaran Nilai pagu dana di atas Rp. 10 miliar sd. OB 700,000
Rp. 25 miliar
1.10.28.01.01.008.009 Honorarium Bendahara Pengeluaran Nilai pagu dana di atas Rp. 25 miliar sd. OB 825,000
Rp. 50 miliar
1.10.28.01.01.008.010 Honorarium Bendahara Pengeluaran Nilai pagu dana di atas Rp. 50 miliar sd. OB 975,000
Rp.75 miliar
1.10.28.01.01.008.011 Honorarium Bendahara Pengeluaran Nilai pagu dana di atas Rp.75 miliar sd. OB 1,125,000
Rp. 100 miliar
1.10.28.01.01.008.012 Honorarium Bendahara Pengeluaran Nilai pagu dana di atas Rp. 100 miliar OB 1,325,000
sd. Rp. 250 miliar
1.10.28.01.01.008.013 Honorarium Bendahara Pengeluaran Nilai pagu dana di atas Rp. 250 miliar OB 1,550,000
sd. Rp. 500 miliar

299
KODE URAIAN SPESIFIKASI SAT. HARGA SAT.
a b c d e
1.10.28.01.01.008.014 Honorarium Bendahara Pengeluaran Nilai pagu dana di atas Rp. 500 miliar OB 1,756,300
sd. Rp. 750 miliar
1.10.28.01.01.008.015 Honorarium Bendahara Pengeluaran Nilai pagu dana di atas Rp. 750 miliar OB 1,975,000
sd. Rp. 1 triliun
1.10.28.01.01.008.016 Honorarium Bendahara Pengeluaran Nilai pagu dana di atas Rp. 1 triliun OB 2,400,000

1.10.28.01.01.009 Honorarium Bendahara Pengeluaran


Pembantu
1.10.28.01.01.009.001 Honorarium Bendahara Pengeluaran Nilai pagu dana sd. Rp. 100 juta OB 165,000
Pembantu
1.10.28.01.01.009.002 Honorarium Bendahara Pengeluaran Nilai pagu dana di atas Rp. 100 juta sd. OB 200,000
Pembantu Rp. 250 juta
1.10.28.01.01.009.003 Honorarium Bendahara Pengeluaran Nilai pagu dana di atas Rp. 250 juta sd. OB 250,000
Pembantu Rp. 500 juta
1.10.28.01.01.009.004 Honorarium Bendahara Pengeluaran Nilai pagu dana di atas Rp. 500 juta sd. OB 300,000
Pembantu Rp. 1 miliar
1.10.28.01.01.009.005 Honorarium Bendahara Pengeluaran Nilai pagu dana di atas Rp. 1 miliar sd. OB 325,000
Pembantu Rp. 2,5 miliar
1.10.28.01.01.009.006 Honorarium Bendahara Pengeluaran Nilai pagu dana di atas Rp. 2,5 miliar sd. OB 375,000
Pembantu Rp. 5 miliar
1.10.28.01.01.009.007 Honorarium Bendahara Pengeluaran Nilai pagu dana di atas Rp. 5 miliar sd. OB 400,000
Pembantu Rp. 10 miliar
1.10.28.01.01.009.008 Honorarium Bendahara Pengeluaran Nilai pagu dana di atas Rp. 10 miliar sd. OB 500,000
Pembantu Rp. 25 miliar
1.10.28.01.01.009.009 Honorarium Bendahara Pengeluaran Nilai pagu dana di atas Rp. 25 miliar sd. OB 625,000
Pembantu Rp. 50 miliar
1.10.28.01.01.009.010 Honorarium Bendahara Pengeluaran Nilai pagu dana di atas Rp. 50 miliar sd. OB 725,000
Pembantu Rp.75 miliar
1.10.28.01.01.009.011 Honorarium Bendahara Pengeluaran Nilai pagu dana di atas Rp.75 miliar sd. OB 850,000
Pembantu Rp. 100 miliar
1.10.28.01.01.009.012 Honorarium Bendahara Pengeluaran Nilai pagu dana di atas Rp. 100 miliar OB 1,000,000
Pembantu sd. Rp. 250 miliar
1.10.28.01.01.009.013 Honorarium Bendahara Pengeluaran Nilai pagu dana di atas Rp. 250 miliar OB 1,150,000
Pembantu sd. Rp. 500 miliar
1.10.28.01.01.009.014 Honorarium Bendahara Pengeluaran Nilai pagu dana di atas Rp. 500 miliar OB 1,325,000
Pembantu sd. Rp. 750 miliar
1.10.28.01.01.009.015 Honorarium Bendahara Pengeluaran Nilai pagu dana di atas Rp. 750 miliar OB 1,475,000
Pembantu sd. Rp. 1 triliun
1.10.28.01.01.009.016 Honorarium Bendahara Pengeluaran Nilai pagu dana di atas Rp. 1 triliun OB 1,800,000
Pembantu
1.10.28.01.01.010 Honorarium Staf Pengelola / Pembuat
Dokumen / Pembantu Bendahara
Pengeluaran

1.10.28.01.01.010.001 Honorarium Staf Pengelola / Pembuat Nilai pagu dana sd. Rp. 100 juta OK 250,000
Dokumen / Pembantu Bendahara
Pengeluaran
1.10.28.01.01.010.002 Honorarium Staf Pengelola / Pembuat Nilai pagu dana di atas Rp. 100 juta sd. OK 300,000
Dokumen / Pembantu Bendahara Rp. 250 juta
Pengeluaran
1.10.28.01.01.010.003 Honorarium Staf Pengelola / Pembuat Nilai pagu dana di atas Rp. 250 juta sd. OK 362,500
Dokumen / Pembantu Bendahara Rp. 500 juta
Pengeluaran
1.10.28.01.01.010.004 Honorarium Staf Pengelola / Pembuat Nilai pagu dana di atas Rp. 500 juta sd. OK 425,000
Dokumen / Pembantu Bendahara Rp. 1 miliar
Pengeluaran
1.10.28.01.01.010.005 Honorarium Staf Pengelola / Pembuat Nilai pagu dana di atas Rp. 1 miliar sd. OK 500,000
Dokumen / Pembantu Bendahara Rp. 2,5 miliar
Pengeluaran
1.10.28.01.01.010.006 Honorarium Staf Pengelola / Pembuat Nilai pagu dana di atas Rp. 2,5 miliar sd. OK 562,500
Dokumen / Pembantu Bendahara Rp. 5 miliar
Pengeluaran

300
KODE URAIAN SPESIFIKASI SAT. HARGA SAT.
a b c d e
1.10.28.01.01.010.007 Honorarium Staf Pengelola / Pembuat Nilai pagu dana di atas Rp. 5 miliar sd. OK 637,500
Dokumen / Pembantu Bendahara Rp. 10 miliar
Pengeluaran
1.10.28.01.01.010.008 Honorarium Staf Pengelola / Pembuat Nilai pagu dana di atas Rp. 10 miliar sd. OK 800,000
Dokumen / Pembantu Bendahara Rp. 25 miliar
Pengeluaran
1.10.28.01.01.010.009 Honorarium Staf Pengelola / Pembuat Nilai pagu dana di atas Rp. 25 miliar sd. OK 975,000
Dokumen / Pembantu Bendahara Rp. 50 miliar
Pengeluaran
1.10.28.01.01.010.010 Honorarium Staf Pengelola / Pembuat Nilai pagu dana di atas Rp. 50 miliar sd. OK 1,150,000
Dokumen / Pembantu Bendahara Rp.75 miliar
Pengeluaran
1.10.28.01.01.010.011 Honorarium Staf Pengelola / Pembuat Nilai pagu dana di atas Rp.75 miliar sd. OK 1,325,000
Dokumen / Pembantu Bendahara Rp. 100 miliar
Pengeluaran
1.10.28.01.01.010.012 Honorarium Staf Pengelola / Pembuat Nilai pagu dana di atas Rp. 100 miliar OK 1,575,000
Dokumen / Pembantu Bendahara sd. Rp. 250 miliar
Pengeluaran
1.10.28.01.01.010.013 Honorarium Staf Pengelola / Pembuat Nilai pagu dana di atas Rp. 250 miliar OK 1,837,500
Dokumen / Pembantu Bendahara sd. Rp. 500 miliar
Pengeluaran
1.10.28.01.01.010.014 Honorarium Staf Pengelola / Pembuat Nilai pagu dana di atas Rp. 500 miliar OK 2,087,500
Dokumen / Pembantu Bendahara sd. Rp. 750 miliar
Pengeluaran
1.10.28.01.01.010.015 Honorarium Staf Pengelola / Pembuat Nilai pagu dana di atas Rp. 750 miliar OK 2,350,000
Dokumen / Pembantu Bendahara sd. Rp. 1 triliun
Pengeluaran
1.10.28.01.01.010.016 Honorarium Staf Pengelola / Pembuat Nilai pagu dana di atas Rp. 1 triliun OK 2,850,000
Dokumen / Pembantu Bendahara
Pengeluaran
1.10.28.01.01.011 Honorarium Bendahara Penerimaan

1.10.28.01.01.011.001 Honorarium Bendahara Penerimaan Target pendapatan sd. 500 juta OB 187,500

1.10.28.01.01.011.002 Honorarium Bendahara Penerimaan Target pendapatan diatas 500 juta sd. 1 OB 312,500
Miliar
1.10.28.01.01.011.003 Honorarium Bendahara Penerimaan Target pendapatan diatas 1 Milliar sd. 5 OB 437,500
Milliar
1.10.28.01.01.011.004 Honorarium Bendahara Penerimaan Target pendapatan diatas 5 Milliar OB 500,000

1.10.28.01.01.012 Honorarium Bendahara Penerimaan


Pembantu
1.10.28.01.01.012.001 Honorarium Bendahara Penerimaan Target pendapatan sd. 500 juta OB 156,300
Pembantu
1.10.28.01.01.012.002 Honorarium Bendahara Penerimaan Target pendapatan diatas 500 juta sd. 1 OB 218,800
Pembantu Miliar
1.10.28.01.01.012.003 Honorarium Bendahara Penerimaan Target pendapatan diatas 1 Milliar sd. 5 OB 312,500
Pembantu Milliar
1.10.28.01.01.012.004 Honorarium Bendahara Penerimaan Target pendapatan diatas 5 Milliar OB 375,000
Pembantu
1.10.28.01.01.013 Honorarium Pengurus Gaji
1.10.28.01.01.013.001 Honorarium Pengurus Gaji Pengurus Gaji OB 350,000

1.10.28.01.01.014 Honorarium Direksi Lapangan /


Pengawas Lapangan - (Diberikan tiap
bulan per paket pekerjaan selama
masa pengawasan pekerjaan)

1.10.28.01.01.014.001 Honorarium Direksi Lapangan / Nilai pagu dana sd. Rp. 100 juta OB 312,500
Pengawas Lapangan
1.10.28.01.01.014.002 Honorarium Direksi Lapangan / Nilai pagu dana di atas Rp. 100 juta sd. OB 437,500
Pengawas Lapangan Rp. 250 juta
1.10.28.01.01.014.003 Honorarium Direksi Lapangan / Nilai pagu dana di atas Rp. 250 juta sd. OB 562,500
Pengawas Lapangan Rp. 500 juta

301
KODE URAIAN SPESIFIKASI SAT. HARGA SAT.
a b c d e
1.10.28.01.01.014.004 Honorarium Direksi Lapangan / Nilai pagu dana di atas Rp. 500 juta sd. OB 687,500
Pengawas Lapangan Rp. 1 miliar
1.10.28.01.01.014.005 Honorarium Direksi Lapangan / Nilai pagu dana di atas Rp. 1 miliar sd. OB 750,000
Pengawas Lapangan Rp. 2,5 miliar
1.10.28.01.01.014.006 Honorarium Direksi Lapangan / Nilai pagu dana di atas Rp. 2,5 miliar sd. OB 875,000
Pengawas Lapangan Rp. 5 miliar
1.10.28.01.01.014.007 Honorarium Direksi Lapangan / Nilai pagu dana di atas Rp. 5 miliar sd. OB 1,000,000
Pengawas Lapangan Rp. 10 miliar
1.10.28.01.01.014.008 Honorarium Direksi Lapangan / Nilai pagu dana di atas Rp. 10 miliar sd. OB 1,125,000
Pengawas Lapangan Rp. 25 miliar
1.10.28.01.01.014.009 Honorarium Direksi Lapangan / Nilai pagu dana di atas Rp. 25 miliar sd. OB 1,250,000
Pengawas Lapangan Rp. 50 miliar
1.10.28.01.01.014.010 Honorarium Direksi Lapangan / Nilai pagu dana di atas Rp. 50 miliar sd. OB 1,750,000
Pengawas Lapangan Rp.75 miliar
1.10.28.01.01.014.011 Honorarium Direksi Lapangan / Nilai pagu dana di atas Rp.75 miliar sd. OB 2,000,000
Pengawas Lapangan Rp. 100 miliar
1.10.28.01.01.014.012 Honorarium Direksi Lapangan / Nilai pagu dana di atas Rp. 100 miliar OB 2,500,000
Pengawas Lapangan sd. Rp. 250 miliar
1.10.28.01.01.014.013 Honorarium Direksi Lapangan / Nilai pagu dana di atas Rp. 250 miliar OB 3,125,000
Pengawas Lapangan sd. Rp. 500 miliar
1.10.28.01.01.015 Honorarium Penerima Hasil Pekerjaan

1.10.28.01.01.015.001 Pejabat Penerima Hasil OB 450,000


Pekerjaan/Pengadaan Barang/Jasa
(PPHP)
1.10.28.01.01.016 Panitia Penerima Hasil
Pekerjaan/Pengadaan Barang/Jasa

1.10.28.01.01.016.001 Panitia Penerima Hasil Nilai pagu pengadaan sampai dengan OP 420,000
Pekerjaan/Pengadaan Barang/Jasa Rp.200 juta
1.10.28.01.01.016.002 Panitia Penerima Hasil Nilai pagu pengadaan di atas OP 520,000
Pekerjaan/Pengadaan Barang/Jasa Rp.200juta sd. Rp.500juta
1.10.28.01.01.016.003 Panitia Penerima Hasil Nilai pagu pengadaan di atas Rp.500 OP 620,000
Pekerjaan/Pengadaan Barang/Jasa juta sd. Rp. 1 miliar
1.10.28.01.01.016.004 Panitia Penerima Hasil Nilai pagu pengadaan di atas Rp. 1 OP 770,000
Pekerjaan/Pengadaan Barang/Jasa milyar sd. Rp.2,5 miliar
1.10.28.01.01.016.005 Panitia Penerima Hasil Nilai pagu pengadaan di atas Rp.2,5 OP 910,000
Pekerjaan/Pengadaan Barang/Jasa miliar sd. Rp.5 miliar
1.10.28.01.01.016.006 Panitia Penerima Hasil Nilai pagu pengadaan di atas Rp. 5 OP 1,060,000
Pekerjaan/Pengadaan Barang/Jasa miliar sd. Rp. 10 miliar
1.10.28.01.01.016.007 Panitia Penerima Hasil Nilai pagu pengadaan di atas Rp. 10 OP 1,260,000
Pekerjaan/Pengadaan Barang/Jasa miliar sd. Rp.25 miliar
1.10.28.01.01.016.008 Panitia Penerima Hasil Nilai pagu pengadaan di atas Rp.25 OP 1,450,000
Pekerjaan/Pengadaan Barang/Jasa miliar sd. Rp.50 miliar
1.10.28.01.01.016.009 Panitia Penerima Hasil Nilai pagu pengadaan di atas Rp.50 OP 1,650,000
Pekerjaan/Pengadaan Barang/Jasa miliar sd. Rp.75 miliar
1.10.28.01.01.016.010 Panitia Penerima Hasil Nilai pagu pengadaan di atas Rp.75 OP 1,840,000
Pekerjaan/Pengadaan Barang/Jasa miliar sd. Rp100 miliar
1.10.28.01.01.016.011 Panitia Penerima Hasil Nilai pagu pengadaan di atas Rp100 OP 2,100,000
Pekerjaan/Pengadaan Barang/Jasa miliar sd Rp250 miliar
1.10.28.01.01.016.012 Panitia Penerima Hasil Nilai pagu pengadaan di atas Rp250 OP 2,370,000
Pekerjaan/Pengadaan Barang/Jasa miliar sd. Rp. 500 milyar
1.10.28.01.01.016.013 Panitia Penerima Hasil Nilai pagu pengadaan di atas Rp 500 OP 2,630,000
Pekerjaan/Pengadaan Barang/Jasa miliar sd. Rp. 750 milyar
1.10.28.01.01.016.014 Panitia Penerima Hasil Nilai pagu pengadaan di atas Rp 750 OP 2,890,000
Pekerjaan/Pengadaan Barang/Jasa miliar sd. Rp. 1 trilyun
1.10.28.01.01.016.015 Panitia Penerima Hasil Nilai pagu pengadaan di atas Rp. 1 OP 3,250,000
Pekerjaan/Pengadaan Barang/Jasa triliun
1.10.28.01.01.099 Honorarium Penanggungjawab
Pengelola Keuangan / Pengelola
Barang Lainnya
1.10.28.01.01.099.001 Penatausahaan Pengelola Perpustakaan OB 1,500,000

302
KODE URAIAN SPESIFIKASI SAT. HARGA SAT.
a b c d e
1.10.28.01.02 Honorarium Penanggungjawab
Pengelola Keuangan Pada Satker Yang
Khusus Mengelola Belanja Pegawai

1.10.28.01.03 Honorarium Pengadaan Barang dan


Jasa - (1 (satu) Orang Pejabat
Pengadaan mendapatkan satu honor
per bulan)

1.10.28.01.03.001 Honorarium Pejabat Pengadaaan


Barang dan Jasa
1.10.28.01.03.001.001 Honorarium Pejabat Pengadaaan Pagu dana adalah pagu pengadaan OB 750,000
Barang dan Jasa langsung yang dikelola oleh Pejabat
Pengadaan
1.10.28.01.03.099 Honorarium Pengadaan Barang dan
Jasa Lainnya
1.10.28.01.04 Honorarium Perangkat Unit Layanan
Pengadaan (ULP)
1.10.28.01.04.001 Honorarium Perangkat Unit Layanan
Pengadaan (ULP)
1.10.28.01.04.001.001 Kepala ULP Honorarium Perangkat Unit Layanan OB 1,000,000
Pengadaan (ULP)
1.10.28.01.04.001.002 Sekretaris Honorarium Perangkat Unit Layanan OB 750,000
Pengadaan (ULP)
1.10.28.01.04.001.003 Staf Pendukung ULP Honorarium Perangkat Unit Layanan OB 600,000
Pengadaan (ULP)
1.10.28.01.04.002 Honorarium Kelompok Kerja Unit
Layanan Pengadaan (Ulp) - Konstruksi

1.10.28.01.04.002.001 Honorarium Kelompok Kerja Unit Nilai pagu pengadaan sampai dengan OP 680,000
Layanan Pengadaan (Ulp) - Konstruksi Rp.200 juta

1.10.28.01.04.002.002 Honorarium Kelompok Kerja Unit Nilai pagu pengadaan di atas Rp. 200 OP 850,000
Layanan Pengadaan (Ulp) - Konstruksi juta sd. Rp. 500 juta

1.10.28.01.04.002.003 Honorarium Kelompok Kerja Unit Nilai pagu pengadaan di atas Rp. 500 OP 1,020,000
Layanan Pengadaan (Ulp) - Konstruksi juta sd. Rp. 1 miliar

1.10.28.01.04.002.004 Honorarium Kelompok Kerja Unit Nilai pagu pengadaan di atas Rp. 1 OP 1,270,000
Layanan Pengadaan (Ulp) - Konstruksi milyar sd. Rp. 2,5 miliar

1.10.28.01.04.002.005 Honorarium Kelompok Kerja Unit Nilai pagu pengadaan di atas Rp. 2,5 OP 1,520,000
Layanan Pengadaan (Ulp) - Konstruksi miliar sd. Rp. 5 miliar

1.10.28.01.04.002.006 Honorarium Kelompok Kerja Unit Nilai pagu pengadaan di atas Rp. 5 OP 1,780,000
Layanan Pengadaan (Ulp) - Konstruksi miliar sd. Rp. 10 miliar

1.10.28.01.04.002.007 Honorarium Kelompok Kerja Unit Nilai pagu pengadaan di atas Rp. 10 OP 2,120,000
Layanan Pengadaan (Ulp) - Konstruksi miliar sd. Rp. 25 miliar

1.10.28.01.04.002.008 Honorarium Kelompok Kerja Unit Nilai pagu pengadaan di atas Rp. 25 OP 2,450,000
Layanan Pengadaan (Ulp) - Konstruksi miliar sd. Rp. 50 miliar

1.10.28.01.04.002.009 Honorarium Kelompok Kerja Unit Nilai pagu pengadaan di atas Rp. 50 OP 2,790,000
Layanan Pengadaan (Ulp) - Konstruksi miliar sd. Rp. 75 miliar

1.10.28.01.04.002.010 Honorarium Kelompok Kerja Unit Nilai pagu pengadaan di atas Rp. 75 OP 3,130,000
Layanan Pengadaan (Ulp) - Konstruksi miliar sd. Rp. 100 miliar

1.10.28.01.04.002.011 Honorarium Kelompok Kerja Unit Nilai pagu pengadaan di atas Rp. 100 OP 3,580,000
Layanan Pengadaan (Ulp) - Konstruksi miliar sd Rp. 250 miliar

303
KODE URAIAN SPESIFIKASI SAT. HARGA SAT.
a b c d e
1.10.28.01.04.002.012 Honorarium Kelompok Kerja Unit Nilai pagu pengadaan di atas Rp. 250 OP 4,030,000
Layanan Pengadaan (Ulp) - Konstruksi miliar sd. Rp. 500 milyar

1.10.28.01.04.002.013 Honorarium Kelompok Kerja Unit Nilai pagu pengadaan di atas Rp. 500 OP 4,490,000
Layanan Pengadaan (Ulp) - Konstruksi miliar sd. Rp. 750 milyar

1.10.28.01.04.002.014 Honorarium Kelompok Kerja Unit Nilai pagu pengadaan di atas Rp. 750 OP 4,940,000
Layanan Pengadaan (Ulp) - Konstruksi miliar sd. Rp. 1 trilyun

1.10.28.01.04.002.015 Honorarium Kelompok Kerja Unit Nilai pagu pengadaan di atas Rp. 1 OP 5,560,000
Layanan Pengadaan (Ulp) - Konstruksi triliun

1.10.28.01.04.003 Honorarium Kelompok Kerja Unit


Layanan Pengadaan (Ulp) – Non
Konstruksi
1.10.28.01.04.003.001 Honorarium Kelompok Kerja Unit Nilai pagu pengadaan sampai dengan OP 760,000
Layanan Pengadaan (Ulp) – Non Rp.200 juta
Konstruksi
1.10.28.01.04.003.002 Honorarium Kelompok Kerja Unit Nilai pagu pengadaan di atas Rp. 200 OP 760,000
Layanan Pengadaan (Ulp) – Non juta sd. Rp. 500 juta
Konstruksi
1.10.28.01.04.003.003 Honorarium Kelompok Kerja Unit Nilai pagu pengadaan di atas Rp. 500 OP 920,000
Layanan Pengadaan (Ulp) – Non juta sd. Rp. 1 miliar
Konstruksi
1.10.28.01.04.003.004 Honorarium Kelompok Kerja Unit Nilai pagu pengadaan di atas Rp. 1 OP 1,140,000
Layanan Pengadaan (Ulp) – Non milyar sd. Rp. 2,5 miliar
Konstruksi
1.10.28.01.04.003.005 Honorarium Kelompok Kerja Unit Nilai pagu pengadaan di atas Rp. 2,5 OP 1,370,000
Layanan Pengadaan (Ulp) – Non miliar sd. Rp. 5 miliar
Konstruksi
1.10.28.01.04.003.006 Honorarium Kelompok Kerja Unit Nilai pagu pengadaan di atas Rp. 5 OP 1,600,000
Layanan Pengadaan (Ulp) – Non miliar sd. Rp. 10 miliar
Konstruksi
1.10.28.01.04.003.007 Honorarium Kelompok Kerja Unit Nilai pagu pengadaan di atas Rp. 10 OP 1,910,000
Layanan Pengadaan (Ulp) – Non miliar sd. Rp. 25 miliar
Konstruksi
1.10.28.01.04.003.008 Honorarium Kelompok Kerja Unit Nilai pagu pengadaan di atas Rp. 25 OP 2,210,000
Layanan Pengadaan (Ulp) – Non miliar sd. Rp. 50 miliar
Konstruksi
1.10.28.01.04.003.009 Honorarium Kelompok Kerja Unit Nilai pagu pengadaan di atas Rp. 50 OP 2,520,000
Layanan Pengadaan (Ulp) – Non miliar sd. Rp. 75 miliar
Konstruksi
1.10.28.01.04.003.010 Honorarium Kelompok Kerja Unit Nilai pagu pengadaan di atas Rp. 75 OP 2,820,000
Layanan Pengadaan (Ulp) – Non miliar sd. Rp. 100 miliar
Konstruksi
1.10.28.01.04.003.011 Honorarium Kelompok Kerja Unit Nilai pagu pengadaan di atas Rp. 100 OP 3,230,000
Layanan Pengadaan (Ulp) – Non miliar sd Rp. 250 miliar
Konstruksi
1.10.28.01.04.003.012 Honorarium Kelompok Kerja Unit Nilai pagu pengadaan di atas Rp. 250 OP 3,640,000
Layanan Pengadaan (Ulp) – Non miliar sd. Rp. 500 milyar
Konstruksi
1.10.28.01.04.003.013 Honorarium Kelompok Kerja Unit Nilai pagu pengadaan di atas Rp. 500 OP 4,040,000
Layanan Pengadaan (Ulp) – Non miliar sd. Rp. 750 milyar
Konstruksi
1.10.28.01.04.003.014 Honorarium Kelompok Kerja Unit Nilai pagu pengadaan di atas Rp. 750 OP 4,450,000
Layanan Pengadaan (Ulp) – Non miliar sd. Rp. 1 trilyun
Konstruksi
1.10.28.01.04.003.015 Honorarium Kelompok Kerja Unit Nilai pagu pengadaan di atas Rp. 1 OP 5,010,000
Layanan Pengadaan (Ulp) – Non triliun
Konstruksi
1.10.28.01.04.004 Honorarium Kelompok Kerja Jasa
lainnya dan Konsultansi Unit Layanan
Pengadaan (Ulp) – Non Konstruksi

304
KODE URAIAN SPESIFIKASI SAT. HARGA SAT.
a b c d e
1.10.28.01.04.004.001 Honorarium Kelompok Kerja Jasa Nilai pagu pengadaan jasa konsultansi OP 450,000
lainnya dan Konsultansi Unit Layanan di atas Rp. 50 juta sd. Rp. 200 juta
Pengadaan (Ulp) – Non Konstruksi

1.10.28.01.04.004.002 Honorarium Kelompok Kerja Jasa Nilai pagu pengadaan jasa konsultansi/ OP 480,000
lainnya dan Konsultansi Unit Layanan jasa lainnya di atas Rp. 200 juta sd.
Pengadaan (Ulp) – Non Konstruksi Rp.250 juta

1.10.28.01.04.004.003 Honorarium Kelompok Kerja Jasa Nilai pagu pengadaan jasa konsultansi/ OP 600,000
lainnya dan Konsultansi Unit Layanan jasa lainnya di atas Rp.250 juta sd.
Pengadaan (Ulp) – Non Konstruksi Rp.500juta

1.10.28.01.04.004.004 Honorarium Kelompok Kerja Jasa Nilai pagu pengadaan jasa konsultansi/ OP 720,000
lainnya dan Konsultansi Unit Layanan jasa lainnya di atas Rp.500 juta sd. Rp.
Pengadaan (Ulp) – Non Konstruksi 1 miliar

1.10.28.01.04.004.005 Honorarium Kelompok Kerja Jasa Nilai pagu pengadaan jasa konsultansi/ OP 910,000
lainnya dan Konsultansi Unit Layanan jasa lainnya di atas Rp. 1 milyar sd.
Pengadaan (Ulp) – Non Konstruksi Rp.2,5 miliar

1.10.28.01.04.004.006 Honorarium Kelompok Kerja Jasa Nilai pagu pengadaan jasa konsultansi/ OP 1,090,000
lainnya dan Konsultansi Unit Layanan jasa lainnya di atas Rp.2,5 miliar sd.
Pengadaan (Ulp) – Non Konstruksi Rp.5 miliar

1.10.28.01.04.004.007 Honorarium Kelompok Kerja Jasa Nilai pagu pengadaan jasa konsultansi/ OP 1,270,000
lainnya dan Konsultansi Unit Layanan jasa lainnya di atas Rp. 5 miliar sd. Rp.
Pengadaan (Ulp) – Non Konstruksi 10 miliar

1.10.28.01.04.004.008 Honorarium Kelompok Kerja Jasa Nilai pagu pengadaan jasa konsultansi/ OP 1,510,000
lainnya dan Konsultansi Unit Layanan jasa lainnya di atas Rp. 10 miliar sd.
Pengadaan (Ulp) – Non Konstruksi Rp.25 miliar

1.10.28.01.04.004.009 Honorarium Kelompok Kerja Jasa Nilai pagu pengadaan jasa konsultansi/ OP 1,750,000
lainnya dan Konsultansi Unit Layanan jasa lainnya di atas Rp.25 miliar sd.
Pengadaan (Ulp) – Non Konstruksi Rp.50 miliar

1.10.28.01.04.004.010 Honorarium Kelompok Kerja Jasa Nilai pagu pengadaan jasa konsultansi/ OP 1,990,000
lainnya dan Konsultansi Unit Layanan jasa lainnya di atas Rp.50 miliar sd.
Pengadaan (Ulp) – Non Konstruksi Rp.75 miliar

1.10.28.01.04.004.011 Honorarium Kelompok Kerja Jasa Nilai pagu pengadaan jasa konsultansi/ OP 2,230,000
lainnya dan Konsultansi Unit Layanan jasa lainnya di atas Rp.75 miliar sd.
Pengadaan (Ulp) – Non Konstruksi Rp100 miliar

1.10.28.01.04.004.012 Honorarium Kelompok Kerja Jasa Nilai pagu pengadaan jasa konsultansi/ OP 2,560,000
lainnya dan Konsultansi Unit Layanan jasa lainnya di atas Rp100 miliar sd
Pengadaan (Ulp) – Non Konstruksi Rp250 miliar

1.10.28.01.04.004.013 Honorarium Kelompok Kerja Jasa Nilai pagu pengadaan jasa konsultansi/ OP 2,880,000
lainnya dan Konsultansi Unit Layanan jasa lainnya di atas Rp250 miliar sd. Rp.
Pengadaan (Ulp) – Non Konstruksi 500 milyar

1.10.28.01.04.004.014 Honorarium Kelompok Kerja Jasa Nilai pagu pengadaan jasa konsultansi/ OP 3,200,000
lainnya dan Konsultansi Unit Layanan jasa lainnya di atas Rp 500 miliar sd.
Pengadaan (Ulp) – Non Konstruksi Rp.750 milyar

1.10.28.01.04.004.015 Honorarium Kelompok Kerja Jasa Nilai pagu pengadaan jasa konsultansi/ OP 3,520,000
lainnya dan Konsultansi Unit Layanan jasa lainnya di atas Rp 750 miliar sd. Rp.
Pengadaan (Ulp) – Non Konstruksi 1 trilyun

1.10.28.01.04.004.016 Honorarium Kelompok Kerja Jasa Nilai pagu pengadaan jasa konsultansi/ OP 3,960,000
lainnya dan Konsultansi Unit Layanan jasa lainnya di atas Rp. 1 triliun
Pengadaan (Ulp) – Non Konstruksi

305
KODE URAIAN SPESIFIKASI SAT. HARGA SAT.
a b c d e
1.10.28.01.04.099 Honorarium Perangkat Unit Layanan
Pengadaan (ULP)
1.10.28.01.09 Honorarium Tim Pelaksana Kegiatan

1.10.28.01.09.001 Honorarium Tim Pelaksana Kegiatan -


(Yang Ditetapkan Oleh Walikota)

1.10.28.01.09.001.001 Pengarah 1 Honorarium Tim Pelaksana Kegiatan - OK 750,000


(Yang Ditetapkan Oleh Walikota)

1.10.28.01.09.001.002 Pengarah 2 Honorarium Tim Pelaksana Kegiatan - OK 725,000


(Yang Ditetapkan Oleh Walikota)

1.10.28.01.09.001.003 Pengarah 3 Honorarium Tim Pelaksana Kegiatan - OK 725,000


(Yang Ditetapkan Oleh Walikota)

1.10.28.01.09.001.004 Penanggung Jawab/Koordinator Honorarium Tim Pelaksana Kegiatan - OK 700,000


(Yang Ditetapkan Oleh Walikota)

1.10.28.01.09.001.005 Ketua Honorarium Tim Pelaksana Kegiatan - OK 650,000


(Yang Ditetapkan Oleh Walikota)

1.10.28.01.09.001.006 Wakil Ketua Honorarium Tim Pelaksana Kegiatan - OK 600,000


(Yang Ditetapkan Oleh Walikota)

1.10.28.01.09.001.007 Sekretaris Honorarium Tim Pelaksana Kegiatan - OK 500,000


(Yang Ditetapkan Oleh Walikota)

1.10.28.01.09.001.008 Anggota - (Koordinator Bidang/Urusan - Honorarium Tim Pelaksana Kegiatan - OK 500,000


apabila diperlukan (Yang Ditetapkan Oleh Walikota)

1.10.28.01.09.003 Honorarium Sekretariat Tim Pelaksana


Kegiatan
1.10.28.01.09.003.001 Ketua/Wakil Honorarium Sekretariat Tim Pelaksana OK 250,000
Kegiatan
1.10.28.01.09.003.002 Anggota Honorarium Sekretariat Tim Pelaksana OK 220,000
Kegiatan
1.10.28.01.09.004 Honorarium Tim Anggaran Pemerintah
Kota Mojokerto
1.10.28.01.09.004.001 Pengarah 1 Honorarium Tim Anggaran Pemerintah OK 3,600,000
Kota Mojokerto
1.10.28.01.09.004.002 Pengarah 2 Honorarium Tim Anggaran Pemerintah OK 3,500,000
Kota Mojokerto
1.10.28.01.09.004.003 Ketua Honorarium Tim Anggaran Pemerintah OK 3,300,000
Kota Mojokerto
1.10.28.01.09.004.004 Wakil Ketua Honorarium Tim Anggaran Pemerintah OK 3,200,000
Kota Mojokerto
1.10.28.01.09.004.005 Sekretaris Honorarium Tim Anggaran Pemerintah OK 3,100,000
Kota Mojokerto
1.10.28.01.09.004.006 Anggota Honorarium Tim Anggaran Pemerintah OK 3,000,000
Kota Mojokerto
1.10.28.01.09.005 Honorarium Sekretariat Tim Anggaran
Pemerintah Kota Mojokerto

1.10.28.01.09.005.001 Koordinator Honorarium Sekretariat Tim Anggaran OK 1,400,000


Pemerintah Kota Mojokerto

1.10.28.01.09.005.002 Sekretaris Honorarium Sekretariat Tim Anggaran OK 1,000,000


Pemerintah Kota Mojokerto

1.10.28.01.09.005.003 Anggota Honorarium Sekretariat Tim Anggaran OK 1,000,000


Pemerintah Kota Mojokerto

306
KODE URAIAN SPESIFIKASI SAT. HARGA SAT.
a b c d e
1.10.28.01.09.006 Honorarium Tim Pembahasan Dan
Penetapan Rancangan Prioritas Dan
Plafon Anggaran Sementara Anggaran
Pendapatan Dan Belanja Daerah

1.10.28.01.09.006.001 Pengarah Honorarium Tim Pembahasan Dan OK 2,100,000


Penetapan Rancangan Prioritas Dan
Plafon Anggaran Sementara Anggaran
Pendapatan Dan Belanja Daerah

1.10.28.01.09.006.002 Penanggung Jawab Honorarium Tim Pembahasan Dan OK 2,000,000


Penetapan Rancangan Prioritas Dan
Plafon Anggaran Sementara Anggaran
Pendapatan Dan Belanja Daerah

1.10.28.01.09.006.003 Koordinator Honorarium Tim Pembahasan Dan OK 1,900,000


Penetapan Rancangan Prioritas Dan
Plafon Anggaran Sementara Anggaran
Pendapatan Dan Belanja Daerah

1.10.28.01.09.006.004 Ketua Honorarium Tim Pembahasan Dan OK 1,800,000


Penetapan Rancangan Prioritas Dan
Plafon Anggaran Sementara Anggaran
Pendapatan Dan Belanja Daerah

1.10.28.01.09.006.005 Wakil Ketua Honorarium Tim Pembahasan Dan OK 1,700,000


Penetapan Rancangan Prioritas Dan
Plafon Anggaran Sementara Anggaran
Pendapatan Dan Belanja Daerah

1.10.28.01.09.006.006 Sekretaris Honorarium Tim Pembahasan Dan OK 1,600,000


Penetapan Rancangan Prioritas Dan
Plafon Anggaran Sementara Anggaran
Pendapatan Dan Belanja Daerah

1.10.28.01.09.006.007 Anggota Honorarium Tim Pembahasan Dan OK 1,500,000


Penetapan Rancangan Prioritas Dan
Plafon Anggaran Sementara Anggaran
Pendapatan Dan Belanja Daerah

1.10.28.01.09.007 Honorarium Tim Pembahasan Dan


Penetapan Rancangan Kebijakan
Umum Anggaran Pendapatan Dan
Belanja Daerah

1.10.28.01.09.007.001 Pengarah Honorarium Tim Pembahasan Dan OK 2,100,000


Penetapan Rancangan Kebijakan
Umum Anggaran Pendapatan Dan
Belanja Daerah
1.10.28.01.09.007.002 Penanggung Jawab Honorarium Tim Pembahasan Dan OK 2,000,000
Penetapan Rancangan Kebijakan
Umum Anggaran Pendapatan Dan
Belanja Daerah
1.10.28.01.09.007.003 Koordinator Honorarium Tim Pembahasan Dan OK 1,900,000
Penetapan Rancangan Kebijakan
Umum Anggaran Pendapatan Dan
Belanja Daerah
1.10.28.01.09.007.004 Ketua Honorarium Tim Pembahasan Dan OK 1,800,000
Penetapan Rancangan Kebijakan
Umum Anggaran Pendapatan Dan
Belanja Daerah

307
KODE URAIAN SPESIFIKASI SAT. HARGA SAT.
a b c d e
1.10.28.01.09.007.005 Wakil Ketua Honorarium Tim Pembahasan Dan OK 1,700,000
Penetapan Rancangan Kebijakan
Umum Anggaran Pendapatan Dan
Belanja Daerah
1.10.28.01.09.007.006 Sekretaris Honorarium Tim Pembahasan Dan OK 1,600,000
Penetapan Rancangan Kebijakan
Umum Anggaran Pendapatan Dan
Belanja Daerah
1.10.28.01.09.007.007 Anggota Honorarium Tim Pembahasan Dan OK 1,500,000
Penetapan Rancangan Kebijakan
Umum Anggaran Pendapatan Dan
Belanja Daerah
1.10.28.01.09.008 Honorarium Tim Pembahasan Dan
Penetapan Rancangan Peraturan
Daerah Tentang Anggaran Pendapatan
Dan Belanja Daerah

1.10.28.01.09.008.001 Pengarah Honorarium Tim Pembahasan Dan OK 3,600,000


Penetapan Rancangan Peraturan
Daerah Tentang Anggaran Pendapatan
Dan Belanja Daerah
1.10.28.01.09.008.002 Penanggung Jawab Honorarium Tim Pembahasan Dan OK 3,500,000
Penetapan Rancangan Peraturan
Daerah Tentang Anggaran Pendapatan
Dan Belanja Daerah
1.10.28.01.09.008.003 Koordinator Honorarium Tim Pembahasan Dan OK 3,400,000
Penetapan Rancangan Peraturan
Daerah Tentang Anggaran Pendapatan
Dan Belanja Daerah
1.10.28.01.09.008.004 Ketua Honorarium Tim Pembahasan Dan OK 3,300,000
Penetapan Rancangan Peraturan
Daerah Tentang Anggaran Pendapatan
Dan Belanja Daerah
1.10.28.01.09.008.005 Wakil Ketua Honorarium Tim Pembahasan Dan OK 3,200,000
Penetapan Rancangan Peraturan
Daerah Tentang Anggaran Pendapatan
Dan Belanja Daerah
1.10.28.01.09.008.006 Sekretaris Honorarium Tim Pembahasan Dan OK 3,100,000
Penetapan Rancangan Peraturan
Daerah Tentang Anggaran Pendapatan
Dan Belanja Daerah
1.10.28.01.09.008.007 Anggota Honorarium Tim Pembahasan Dan OK 3,000,000
Penetapan Rancangan Peraturan
Daerah Tentang Anggaran Pendapatan
Dan Belanja Daerah
1.10.28.01.09.009 Honorarium Tim Pembahasan Dan
Penetapan Rancangan Peraturan
Daerah Tentang Laporan Keterangan
Pertanggungjawaban Walikota

1.10.28.01.09.009.001 Pengarah Honorarium Tim Pembahasan Dan OK 3,600,000


Penetapan Rancangan Peraturan
Daerah Tentang Laporan Keterangan
Pertanggungjawaban Walikota

1.10.28.01.09.009.002 Penanggung Jawab Honorarium Tim Pembahasan Dan OK 3,500,000


Penetapan Rancangan Peraturan
Daerah Tentang Laporan Keterangan
Pertanggungjawaban Walikota

1.10.28.01.09.009.003 Koordinator Honorarium Tim Pembahasan Dan OK 3,400,000


Penetapan Rancangan Peraturan
Daerah Tentang Laporan Keterangan
Pertanggungjawaban Walikota

308
KODE URAIAN SPESIFIKASI SAT. HARGA SAT.
a b c d e
1.10.28.01.09.009.004 Ketua Honorarium Tim Pembahasan Dan OK 3,300,000
Penetapan Rancangan Peraturan
Daerah Tentang Laporan Keterangan
Pertanggungjawaban Walikota

1.10.28.01.09.009.005 Wakil Ketua Honorarium Tim Pembahasan Dan OK 3,200,000


Penetapan Rancangan Peraturan
Daerah Tentang Laporan Keterangan
Pertanggungjawaban Walikota

1.10.28.01.09.009.006 Sekretaris Honorarium Tim Pembahasan Dan OK 3,100,000


Penetapan Rancangan Peraturan
Daerah Tentang Laporan Keterangan
Pertanggungjawaban Walikota

1.10.28.01.09.009.007 Anggota Honorarium Tim Pembahasan Dan OK 3,000,000


Penetapan Rancangan Peraturan
Daerah Tentang Laporan Keterangan
Pertanggungjawaban Walikota

1.10.28.01.09.010 Honorarium Tim Pokja Kegiatan

1.10.28.01.09.010.006 Ketua Pokja/Program Honorarium Tim Pokja Kegiatan OK 525,000

1.10.28.01.09.010.007 Wakil Ketua Pokja/Program Honorarium Tim Pokja Kegiatan OK 500,000

1.10.28.01.09.010.008 Anggota Honorarium Tim Pokja Kegiatan OK 500,000

1.10.28.01.09.012 Honorarium Tim Penyusunan,


Penetapan dan Perubahan Rencana
Kerja Pembangunan Daerah (RKPD)
Kota Mojokerto

1.10.28.01.09.012.001 Pembina I Honorarium Tim Penyusunan, OK 2,000,000


Penetapan dan Perubahan Rencana
Kerja Pembangunan Daerah (RKPD)
Kota Mojokerto
1.10.28.01.09.012.002 Pembina II Honorarium Tim Penyusunan, OK 1,750,000
Penetapan dan Perubahan Rencana
Kerja Pembangunan Daerah (RKPD)
Kota Mojokerto
1.10.28.01.09.012.003 Ketua Honorarium Tim Penyusunan, OK 1,500,000
Penetapan dan Perubahan Rencana
Kerja Pembangunan Daerah (RKPD)
Kota Mojokerto
1.10.28.01.09.012.004 Sekretaris Honorarium Tim Penyusunan, OK 1,250,000
Penetapan dan Perubahan Rencana
Kerja Pembangunan Daerah (RKPD)
Kota Mojokerto
1.10.28.01.09.012.005 Anggota Honorarium Tim Penyusunan, OK 1,000,000
Penetapan dan Perubahan Rencana
Kerja Pembangunan Daerah (RKPD)
Kota Mojokerto
1.10.28.01.09.013 Honorarium Tim Pelaksana kegiatan
Fasilitasi Penyelesaian Perselisihan
Hubungan Industrial

1.10.28.01.09.013.001 Penanggungjawab Tim Mediasi Honorarium Tim Pelaksana kegiatan Orang/Kasus 500,000
Fasilitasi Penyelesaian Perselisihan
Hubungan Industrial
1.10.28.01.09.013.002 Mediator Hubungan Industrial Honorarium Tim Pelaksana kegiatan Orang/Kasus 400,000
Fasilitasi Penyelesaian Perselisihan
Hubungan Industrial

309
KODE URAIAN SPESIFIKASI SAT. HARGA SAT.
a b c d e
1.10.28.01.09.013.003 Anggota Tim Mediasi Honorarium Tim Pelaksana kegiatan Orang/Kasus 300,000
Fasilitasi Penyelesaian Perselisihan
Hubungan Industrial
1.10.28.01.09.014 Honorarium Tim Pembahasan Dan
Penetapan Raperda Kota Mojokerto

1.10.28.01.09.014.001 Pengarah Honorarium Tim Pembahasan Dan OK 3,600,000


Penetapan Raperda Kota Mojokerto

1.10.28.01.09.014.002 Penanggung Jawab Honorarium Tim Pembahasan Dan OK 3,500,000


Penetapan Raperda Kota Mojokerto

1.10.28.01.09.014.003 Koordinator Honorarium Tim Pembahasan Dan OK 3,400,000


Penetapan Raperda Kota Mojokerto

1.10.28.01.09.014.004 Ketua Honorarium Tim Pembahasan Dan OK 3,300,000


Penetapan Raperda Kota Mojokerto

1.10.28.01.09.014.005 Wakil Ketua Honorarium Tim Pembahasan Dan OK 3,200,000


Penetapan Raperda Kota Mojokerto

1.10.28.01.09.014.006 Sekretaris Honorarium Tim Pembahasan Dan OK 3,100,000


Penetapan Raperda Kota Mojokerto

1.10.28.01.09.014.007 Anggota Honorarium Tim Pembahasan Dan OK 3,000,000


Penetapan Raperda Kota Mojokerto

1.10.28.01.09.015 Honorarium Tim Penyusunan Jurnal /


Buletin / Majalah / Tabloid

1.10.28.01.09.015.001 Penanggung Jawab Honorarium Tim Penyusunan Jurnal / Oter 500,000


Buletin / Majalah / Tabloid
1.10.28.01.09.015.002 Redaktur Honorarium Tim Penyusunan Jurnal / Oter 400,000
Buletin / Majalah / Tabloid
1.10.28.01.09.015.003 Penyunting/Editor Honorarium Tim Penyusunan Jurnal / Oter 300,000
Buletin / Majalah / Tabloid
1.10.28.01.09.015.004 Desain Grafis Honorarium Tim Penyusunan Jurnal / Oter 180,000
Buletin / Majalah / Tabloid
1.10.28.01.09.015.005 Fotografer Honorarium Tim Penyusunan Jurnal / Oter 180,000
Buletin / Majalah / Tabloid
1.10.28.01.09.015.006 Sekretariat Honorarium Tim Penyusunan Jurnal / Oter 150,000
Buletin / Majalah / Tabloid
1.10.28.01.09.015.007 Pembuat artikel Honorarium Tim Penyusunan Jurnal / Halaman 200,000
Buletin / Majalah / Tabloid
1.10.28.01.09.016 Honorarium Tim Pengelola Website
Pemerintah Kota Mojokerto

1.10.28.01.09.016.001 Penanggung Jawab Honorarium Tim Pengelola Website OB 500,000


Pemerintah Kota Mojokerto

1.10.28.01.09.016.002 Redaktur Honorarium Tim Pengelola Website OB 450,000


Pemerintah Kota Mojokerto

1.10.28.01.09.016.003 Editor Honorarium Tim Pengelola Website OB 400,000


Pemerintah Kota Mojokerto

1.10.28.01.09.016.004 Web Admin Honorarium Tim Pengelola Website OB 350,000


Pemerintah Kota Mojokerto

1.10.28.01.09.016.005 Web Developer Honorarium Tim Pengelola Website OB 300,000


Pemerintah Kota Mojokerto

310
KODE URAIAN SPESIFIKASI SAT. HARGA SAT.
a b c d e
1.10.28.01.09.016.006 Pembuat Artikel Honorarium Tim Pengelola Website Halaman 100,000
Pemerintah Kota Mojokerto

1.10.28.01.09.017 Honorarium Panitia Seleksi Terbuka


Jabatan Pimpinan Tinggi Pratama

1.10.28.01.09.017.001 Ketua Honorarium Panitia Seleksi Terbuka OK 2,500,000


Jabatan Pimpinan Tinggi Pratama

1.10.28.01.09.017.002 Sekretaris Honorarium Panitia Seleksi Terbuka OK 2,400,000


Jabatan Pimpinan Tinggi Pratama

1.10.28.01.09.017.003 Anggota Honorarium Panitia Seleksi Terbuka OK 2,300,000


Jabatan Pimpinan Tinggi Pratama

1.10.28.01.09.019 Tunjangan Kelangkaan Profesi -


(Pembinaan dan Pengawasan Bagi
APIP dan Aparatur Pendukung Di
Lingkungan Inspektorat Kota
Mojokerto)
1.10.28.01.09.019.001 Inspektur Penanggungjawab/APIP OB 1,800,000

1.10.28.01.09.019.002 Sekretaris dan Inspektur pembantu Wakil Penanggungjawab/APIP OB 1,500,000

1.10.28.01.09.019.003 Auditor Madya Pengendali Teknis / APIP OB 1,000,000

1.10.28.01.09.019.004 Auditor Muda Anggota / APIP OB 900,000

1.10.28.01.09.019.005 Kasubag Anggota / APIP OB 900,000

1.10.28.01.09.019.006 Auditor Pertama Anggota / APIP OB 700,000

1.10.28.01.09.019.007 Staf penunjang oprasional Anggota / APIP OB 700,000

1.10.28.01.09.020 Honorarium Tim Penilai Angka kredit permenpan 2009

1.10.28.01.09.020.001 Ketua Honorarium Tim Penilai Angka kredit Per Semester 500,000
1.10.28.01.09.020.002 Wakil Ketua Honorarium Tim Penilai Angka kredit Per Semester 400,000
1.10.28.01.09.020.003 Sekretaris Honorarium Tim Penilai Angka kredit Per Semester 300,000
1.10.28.01.09.020.004 Anggota Honorarium Tim Penilai Angka kredit Per Semester 250,000
1.10.28.01.09.021 Honor Unit Saber Pungli
1.10.28.01.09.021.001 Penanggung Jawab Unit Saber Pungli OK 1,500,000

1.10.28.01.09.021.002 Pendamping Penanggung Jawab I Unit Saber Pungli OK 1,500,000

1.10.28.01.09.021.003 Pendamping Penanggung Jawab II Unit Saber Pungli OK 1,500,000

1.10.28.01.09.021.004 Pendamping Penanggung Jawab III Unit Saber Pungli OK 1,500,000

1.10.28.01.09.021.005 Ketua Unit Saber Pungli OK 1,300,000

1.10.28.01.09.021.006 Wakil Ketua I Unit Saber Pungli OK 1,200,000

1.10.28.01.09.021.007 Wakil Ketua II Unit Saber Pungli OK 1,200,000

1.10.28.01.09.021.008 Sekretaris Unit Saber Pungli OK 1,000,000

1.10.28.01.09.021.009 Bidang Operasional Unit Saber Pungli OK 900,000

1.10.28.01.09.021.010 Bidang Logistik Unit Saber Pungli OK 900,000

1.10.28.01.09.021.011 Bidang Administrasi Umum I Unit Saber Pungli OK 900,000

311
KODE URAIAN SPESIFIKASI SAT. HARGA SAT.
a b c d e
1.10.28.01.09.021.012 Bidang Administrasi Umum II Unit Saber Pungli OK 900,000

1.10.28.01.09.021.013 Bidang Keuangan Unit Saber Pungli OK 900,000

1.10.28.01.09.021.014 Bidang Informasi Unit Saber Pungli OK 900,000

1.10.28.01.09.021.015 Bidang Publikasi Umum Unit Saber Pungli OK 900,000

1.10.28.01.09.021.016 Ketua Pokja Unit Intelejen, Unit Unit Saber Pungli OK 1,000,000
Pencegahan, Unit Penindakan Dan Unit
Yustisi
1.10.28.01.09.021.017 Anggota Pokja Unit Intelejen, Unit Unit Saber Pungli OK 900,000.00
Pencegahan, Unit Penindakan Dan Unit
Yustisi
1.10.28.01.09.022 Honorarium Perangkat Layanan
Pengadaan Secara Elektronik (LPSE)

1.10.28.01.09.022.001 Kepala LPSE Honorarium Perangkat Layanan OB 1,000,000


Pengadaan Secara Elektronik (LPSE)

1.10.28.01.09.022.002 Administrasi Agensi Honorarium Perangkat Layanan OB 600,000


Pengadaan Secara Elektronik (LPSE)

1.10.28.01.09.022.003 Administrasi Helpdesk Honorarium Perangkat Layanan OB 600,000


Pengadaan Secara Elektronik (LPSE)

1.10.28.01.09.022.003 Administrasi PPE Honorarium Perangkat Layanan OB 600,000


Pengadaan Secara Elektronik (LPSE)

1.10.28.01.09.023 Satuan Biaya Pemeriksaan Berkala


Dinas Pendidikan/Dinas
Pupr/Rsud/Dinas Kesehatan

1.10.28.01.09.023.001 Penanggung Jawab OK 2,600,000

1.10.28.01.09.023.002 Wakil Penanggung Jawab OK 2,300,000

1.10.28.01.09.023.003 Sekretaris OK 2,300,000

1.10.28.01.09.023.004 Pengendali Teknis OK 2,200,000

1.10.28.01.09.023.005 Ketua Tim OK 2,100,000

1.10.28.01.09.023.006 Anggota Tim OK 2,000,000

1.10.28.01.09.023.007 Pembantu Auditor OK 1,900,000

1.10.28.01.09.023.008 Tenaga Pendukung OK 700,000

1.10.28.01.09.024 Satuan Biaya Pemeriksaan Berkala 3


Kecamatan Dan Sekretariat Daerah

1.10.28.01.09.024.001 Penanggung Jawab OK 2,200,000

1.10.28.01.09.024.002 Wakil Penanggung Jawab OK 1,900,000

1.10.28.01.09.024.003 Sekretaris OK 1,900,000

1.10.28.01.09.024.004 Pengendali Teknis OK 1,800,000

1.10.28.01.09.024.005 Ketua Tim OK 1,700,000

1.10.28.01.09.024.006 Anggota Tim OK 1,600,000

312
KODE URAIAN SPESIFIKASI SAT. HARGA SAT.
a b c d e
1.10.28.01.09.024.007 Pembantu Auditor OK 1,500,000

1.10.28.01.09.024.008 Tenaga Pendukung OK 500,000

1.10.28.01.09.025 Satuan Biaya Pemeriksaan Berkala


Bppkad/Bappeko/Dlh/Pkp

1.10.28.01.09.025.001 Penanggung Jawab OK 1,500,000

1.10.28.01.09.025.002 Wakil Penanggung Jawab OK 1,200,000

1.10.28.01.09.025.003 Sekretaris OK 1,200,000

1.10.28.01.09.025.004 Pengendali Teknis OK 1,100,000

1.10.28.01.09.025.005 Ketua Tim OK 1,000,000

1.10.28.01.09.025.006 Anggota Tim OK 900,000

1.10.28.01.09.025.007 Pembantu Auditor OK 800,000

1.10.28.01.09.025.008 Tenaga Pendukung OK 200,000

1.10.28.01.09.026 Satuan Biaya Pemeriksaan Berkala


Badan/Dinas/Sekretariat Dprd/Satpol
Pp

1.10.28.01.09.026.001 Penanggung Jawab OK 1,200,000

1.10.28.01.09.026.002 Wakil Penanggung Jawab OK 900,000

1.10.28.01.09.026.003 Sekretaris OK 900,000

1.10.28.01.09.026.004 Pengendali Teknis OK 800,000

1.10.28.01.09.026.005 Ketua Tim OK 700,000

1.10.28.01.09.026.006 Anggota Tim OK 600,000

1.10.28.01.09.026.007 Pembantu Auditor OK 500,000

1.10.28.01.09.026.008 Tenaga Pendukung OK 200,000

1.10.28.01.09.027 Satuan Biaya Pemeriksaan Berkala


PDAM/BPRS/KPU/BNN
1.10.28.01.09.027.001 Penanggung Jawab OK 900,000

1.10.28.01.09.027.002 Wakil Penanggung Jawab OK 600,000

1.10.28.01.09.027.003 Sekretaris OK 600,000

1.10.28.01.09.027.004 Pengendali Teknis OK 500,000

1.10.28.01.09.027.005 Ketua Tim OK 400,000

1.10.28.01.09.027.006 Anggota Tim OK 300,000

1.10.28.01.09.027.007 Pembantu Auditor OK 200,000

1.10.28.01.09.027.008 Tenaga Pendukung OK 100,000

1.10.28.01.09.028 Satuan Biaya Reviu Lkpd


1.10.28.01.09.028.001 Penanggung Jawab OK 1,600,000

313
KODE URAIAN SPESIFIKASI SAT. HARGA SAT.
a b c d e
1.10.28.01.09.028.002 Wakil Penanggung Jawab OK 1,300,000

1.10.28.01.09.028.003 Sekretaris OK 1,300,000

1.10.28.01.09.028.004 Pengendali Teknis OK 1,200,000

1.10.28.01.09.028.005 Ketua Tim OK 1,100,000

1.10.28.01.09.028.006 Anggota Tim OK 1,000,000

1.10.28.01.09.028.007 Pembantu Auditor OK 900,000

1.10.28.01.09.028.008 Tenaga Pendukung OK 500,000

1.10.28.01.09.029 Satuan Biaya Reviu RTP & Reviu RKA

1.10.28.01.09.029.001 Penanggung Jawab OK 1,100,000

1.10.28.01.09.029.002 Wakil Penanggung Jawab OK 800,000

1.10.28.01.09.029.003 Sekretaris OK 800,000

1.10.28.01.09.029.004 Pengendali Teknis OK 700,000

1.10.28.01.09.029.005 Ketua Tim OK 600,000

1.10.28.01.09.029.006 Anggota Tim OK 500,000

1.10.28.01.09.029.007 Pembantu Auditor OK 400,000

1.10.28.01.09.029.008 Tenaga Pendukung OK 200,000

1.10.28.01.09.030 Satuan Biaya Reviu RKA Perubahan,


Reviu Laporan Keuangan Semester I &
EPPD
1.10.28.01.09.030.001 Penanggung Jawab OK 900,000

1.10.28.01.09.030.002 Wakil Penanggung Jawab OK 600,000

1.10.28.01.09.030.003 Sekretaris OK 600,000

1.10.28.01.09.030.004 Pengendali Teknis OK 500,000

1.10.28.01.09.030.005 Ketua Tim OK 400,000

1.10.28.01.09.030.006 Anggota Tim OK 300,000

1.10.28.01.09.030.007 Pembantu Auditor OK 200,000

1.10.28.01.09.030.008 Tenaga Pendukung OK 100,000

1.10.28.01.09.031 Satuan Biaya Reviu LKJIP, Reviu RKPD,


Reviu RENJA, Reviu KUAPPAS, Reviu
RKPJMD & Reviu RENSTRA

1.10.28.01.09.031.001 Penanggung Jawab OK 700,000

1.10.28.01.09.031.002 Wakil Penanggung Jawab OK 400,000

1.10.28.01.09.031.003 Sekretaris OK 400,000

1.10.28.01.09.031.004 Pengendali Teknis OK 350,000

314
KODE URAIAN SPESIFIKASI SAT. HARGA SAT.
a b c d e
1.10.28.01.09.031.005 Ketua Tim OK 300,000

1.10.28.01.09.031.006 Anggota Tim OK 250,000

1.10.28.01.09.031.007 Pembantu Auditor OK 150,000

1.10.28.01.09.031.008 Tenaga Pendukung OK 100,000

1.10.28.01.09.032 Satuan Biaya Reviu Penyerapan


Anggaran dan Pengadaan Barang/Jasa
& Reviu KUPAPPAS

1.10.28.01.09.032.001 Penanggung Jawab OK 600,000

1.10.28.01.09.032.002 Wakil Penanggung Jawab OK 350,000

1.10.28.01.09.032.003 Sekretaris OK 350,000

1.10.28.01.09.032.004 Pengendali Teknis OK 300,000

1.10.28.01.09.032.005 Ketua Tim OK 250,000

1.10.28.01.09.032.006 Anggota Tim OK 200,000

1.10.28.01.09.032.007 Pembantu Auditor OK 150,000

1.10.28.01.09.032.008 Tenaga Pendukung OK 100,000

1.10.28.01.09.033 Satuan Biaya Evaluasi Sakip Skpd

1.10.28.01.09.033.001 Penanggung Jawab OK 1,400,000

1.10.28.01.09.033.002 Wakil Penanggung Jawab OK 1,100,000

1.10.28.01.09.033.003 Sekretaris OK 1,100,000

1.10.28.01.09.033.004 Pengendali Teknis OK 1,000,000

1.10.28.01.09.033.005 Ketua Tim OK 900,000

1.10.28.01.09.033.006 Anggota Tim OK 800,000

1.10.28.01.09.033.007 Pembantu Auditor OK 700,000

1.10.28.01.09.033.008 Tenaga Pendukung OK 300,000

1.10.28.01.09.034 Satuan Biaya Evaluasi RTP


1.10.28.01.09.034.001 Penanggung Jawab OK 900,000

1.10.28.01.09.034.002 Wakil Penanggung Jawab OK 600,000

1.10.28.01.09.034.003 Sekretaris OK 600,000

1.10.28.01.09.034.004 Pengendali Teknis OK 500,000

1.10.28.01.09.034.005 Ketua Tim OK 400,000

1.10.28.01.09.034.006 Anggota Tim OK 300,000

1.10.28.01.09.034.007 Pembantu Auditor OK 200,000

1.10.28.01.09.034.008 Tenaga Pendukung OK 100,000

315
KODE URAIAN SPESIFIKASI SAT. HARGA SAT.
a b c d e
1.10.28.01.09.035 Satuan Biaya Pemeriksaan Khusus
Pemeriksaan BOS
1.10.28.01.09.035.001 Penanggung Jawab OK 1,300,000

1.10.28.01.09.035.002 Wakil Penanggung Jawab OK 1,000,000

1.10.28.01.09.035.003 Sekretaris OK 1,000,000

1.10.28.01.09.035.004 Pengendali Teknis OK 900,000

1.10.28.01.09.035.005 Ketua Tim OK 800,000

1.10.28.01.09.035.006 Anggota Tim OK 700,000

1.10.28.01.09.035.007 Pembantu Auditor OK 600,000

1.10.28.01.09.035.008 Tenaga Pendukung OK 300,000

1.10.28.01.09.036 Satuan Biaya Pemeriksaan Khusus


Pendampingan Pemeriksaan Eksternal

1.10.28.01.09.036.001 Penanggung Jawab OK 3,500,000

1.10.28.01.09.036.002 Ketua Tim OK 3,200,000

1.10.28.01.09.036.003 Anggota Tim OK 3,000,000

1.10.28.01.09.037 Satuan Biaya Pemeriksaan Khusus


Pemeriksaan Dengan Tujuan Tertentu
Resiko Rendah

1.10.28.01.09.037.001 Penanggung Jawab OK 400,000

1.10.28.01.09.037.002 Wakil Penanggung Jawab OK 300,000

1.10.28.01.09.037.003 Pengendali Teknis OK 300,000

1.10.28.01.09.037.004 Ketua Tim OK 250,000

1.10.28.01.09.037.005 Anggota Tim OK 200,000

1.10.28.01.09.038 Satuan Biaya Pemeriksaan Khusus


Pemeriksaan Dengan Tujuan Tertentu
Resiko Tinggi
1.10.28.01.09.038.001 Penanggung Jawab OK 700,000

1.10.28.01.09.038.002 Wakil Penanggung Jawab OK 600,000

1.10.28.01.09.038.003 Pengendali Teknis OK 500,000

1.10.28.01.09.038.004 Ketua Tim OK 400,000

1.10.28.01.09.038.005 Anggota Tim OK 300,000

1.10.28.01.09.039 Satuan Biaya Pemeriksaan Khusus


Tp4D
1.10.28.01.09.039.001 Pengarah OK 650,000

1.10.28.01.09.039.002 Ketua 1 OK 550,000

1.10.28.01.09.039.003 Ketua 2 OK 550,000

1.10.28.01.09.039.004 Wakil Ketua OK 600,000

316
KODE URAIAN SPESIFIKASI SAT. HARGA SAT.
a b c d e
1.10.28.01.09.039.005 Sekretaris OK 500,000

1.10.28.01.09.039.006 Anggota OK 400,000

1.10.28.01.09.039.007 Anggota Pendukung OK 400,000

1.10.28.01.09.040 Satuan Biaya Pemeriksaan Khusus Tim


Pelaksana Upg
1.10.28.01.09.040.001 Pengarah 1 OK 750,000

1.10.28.01.09.040.002 Pengarah 2 OK 725,000

1.10.28.01.09.040.003 Penanggung Jawab OK 700,000

1.10.28.01.09.040.004 Ketua OK 650,000

1.10.28.01.09.040.005 Wakil Ketua OK 600,000

1.10.28.01.09.040.006 Sekretaris OK 550,000

1.10.28.01.09.040.007 Anggota OK 500,000

1.10.28.01.09.041 Satuan Biaya Pemeriksaan Khusus Tim


Penyelesaian Kerugian Daerah

1.10.28.01.09.041.001 Ketua Tim OK 650,000

1.10.28.01.09.041.002 Wakil Ketua I OK 600,000

1.10.28.01.09.041.003 Wakil Ketua Ii OK 600,000

1.10.28.01.09.041.004 Sekretaris OK 500,000

1.10.28.01.09.041.005 Anggota Tim OK 450,000

1.10.28.01.09.042 Satuan Biaya Pemeriksaan Khusus


Sekretariat Tim Penyelesaian Kerugian
Daerah
1.10.28.01.09.042.001 Ketua OK 250,000
1.10.28.01.09.042.002 Anggota OK 220,000
1.10.28.01.09.043 Satuan Biaya Monev TL SAKIP OPD

1.10.28.01.09.043.001 Penanggung Jawab OK 900,000

1.10.28.01.09.043.002 Wakil Penanggung Jawab OK 600,000

1.10.28.01.09.043.003 Sekretaris OK 600,000

1.10.28.01.09.043.004 Pengendali Teknis OK 500,000

1.10.28.01.09.043.005 Ketua Tim OK 400,000

1.10.28.01.09.043.006 Anggota Tim OK 300,000

1.10.28.01.09.043.007 Pembantu Auditor OK 200,000

1.10.28.01.09.043.008 Tenaga Pendukung OK 100,000

1.10.28.01.09.044 Satuan Biaya Monev


DBHCHT/DAK/PUG
1.10.28.01.09.044.001 Penanggung Jawab OK 700,000
1.10.28.01.09.044.002 Wakil Penanggung Jawab OK 400,000
1.10.28.01.09.044.003 Sekretaris OK 400,000
1.10.28.01.09.044.004 Pengendali Teknis OK 350,000
1.10.28.01.09.044.005 Ketua Tim OK 300,000

317
KODE URAIAN SPESIFIKASI SAT. HARGA SAT.
a b c d e
1.10.28.01.09.044.006 Anggota Tim OK 250,000
1.10.28.01.09.044.007 Pembantu Auditor OK 150,000
1.10.28.01.09.044.008 Tenaga Pendukung OK 100,000
1.10.28.01.09.099 Honorarium Tim Pelaksana Kegiatan
Lainnya
1.10.28.01.09.099.001 Honor kader motivator OPD yang mempunyai Kader OB 75,000
(masyarakat) dilingkup kegiatannya

1.10.28.01.09.099.002 Honor Pelindung Kegiatan PSN OB 750,000

1.10.28.01.09.099.003 Ketua Kegiatan FKKS (Forum Komunikasi Kota OB 300,000


Sehat)
1.10.28.01.09.099.004 Sekretaris Kegiatan FKKS (Forum Komunikasi Kota OB 280,000
Sehat)
1.10.28.01.09.099.005 Bendahara Kegiatan FKKS (Forum Komunikasi Kota OB 250,000
Sehat)
1.10.28.01.09.099.006 Ketua Kegiatan Pokja Kelurahan Sehat OB 275,000

1.10.28.01.09.099.007 Sekretaris Kegiatan Pokja Kelurahan Sehat OB 250,000

1.10.28.01.09.099.008 Bendahara Kegiatan Pokja Kelurahan Sehat OB 225,000

1.10.28.01.99 Honorarium Umum Lainnya


1.10.28.01.99.001 Honorarium Pegawai Pemerintah
Dengan Perjanjian Kerja (Non Pegawai
Negeri)
1.10.28.01.99.001.001 SMA/SMK Jasa Tenaga Kerja Non Sertifikat OB 1,886,000

1.10.28.01.99.001.002 Diploma Jasa Tenaga Kerja Non Sertifikat OB 2,150,040

1.10.28.01.99.001.003 Strata 1 Jasa Tenaga Kerja Non Sertifikat OB 2,338,640

1.10.28.01.99.001.004 Strata 2 Jasa Tenaga Kerja Non Sertifikat OB 2,508,380

1.10.28.01.99.002.001 SMA/SMK Jasa Tenaga Kerja Bersertifikat OB 2,508,380

1.10.28.01.99.002.002 Diploma Jasa Tenaga Kerja Bersertifikat OB 2,859,553

1.10.28.01.99.002.003 Strata 1 Jasa Tenaga Kerja Bersertifikat OB 3,545,846

1.10.28.01.99.002.003 Strata 2 Jasa Tenaga Kerja Bersertifikat OB 4,715,975


1.10.28.01.99.003 Vakasi & Honorarium Penyelenggaraan
Ujian
1.10.28.01.99.003.001 Pemeriksaan Hasil Ujian Vakasi - (Pendidikan Dasar) Siswa/ 5,000
MataUjian
1.10.28.01.99.003.002 Pemeriksaan Hasil Ujian Vakasi - (Pendidikan Menengah) Siswa/ 7,500
Mata Ujian
1.10.28.01.99.003.003 Penyusunan/pembuatan bahan Ujian Honorarium Penyelenggaraan Ujian - Naskah/ 150,000
(Pendidikan Dasar) pelajaran
1.10.28.01.99.003.004 Pengawas Ujian Honorarium Penyelenggaraan Ujian - OH 240,000
(Pendidikan Dasar)
1.10.28.01.99.003.005 Penyusunan/pembuatan bahan Ujian Honorarium Penyelenggaraan Ujian - Naskah/ 190,000
(Pendidikan Menengah) pelajaran
1.10.28.01.99.003.006 Pengawas Ujian Honorarium Penyelenggaraan Ujian - OH 270,000
(Pendidikan Menengah)
1.10.28.01.99.004 Honorarium Pengajar Diklat
1.10.28.01.99.004.001 Pengajar dari dalam SKPD Honorarium Pengajar Diklat OJ 200,000

1.10.28.01.99.004.002 Pengajar dari luar SKPD (Internal Honorarium Pengajar Diklat OJ 300,000
PEMDA)
1.10.28.01.99.004.003 Penyusun Materi/Naskah Honorarium Pengajar Diklat Per Materi 150,000

1.10.28.01.99.005 Honorarium Penunjang Penelitian /


Perekayasaan

318
KODE URAIAN SPESIFIKASI SAT. HARGA SAT.
a b c d e
1.10.28.01.99.005.001 Peneliti Utama ( Maksimum 4 Jam / Honorarium Penunjang Penelitian / OJ 60,000
hari ) Perekayasaan
1.10.28.01.99.005.002 Peneliti Madya ( Maksimum 4 Jam / Honorarium Penunjang Penelitian / OJ 50,000
hari ) Perekayasaan
1.10.28.01.99.005.003 Peneliti Muda ( Maksimum 4 Jam / hari Honorarium Penunjang Penelitian / OJ 40,000
) Perekayasaan
1.10.28.01.99.005.004 Peneliti Pertama ( Maksimum 4 Jam / Honorarium Penunjang Penelitian / OJ 35,000
hari ) Perekayasaan
1.10.28.01.99.005.005 Peneliti (Non Fungsional Peneliti) Honorarium Penunjang Penelitian / OJ 30,000
Perekayasaan
1.10.28.01.99.005.006 Pembantu Peneliti/Perekayasa Honorarium Penunjang Penelitian / OJ 25,000
Perekayasaan
1.10.28.01.99.005.007 Koordinator Peneliti/Perekayasa Honorarium Penunjang Penelitian / OB 420,000
Perekayasaan
1.10.28.01.99.005.008 Sekretariat Penelitian/Perekayasa Honorarium Penunjang Penelitian / OB 300,000
Perekayasaan
1.10.28.01.99.005.009 Pengolah Data Honorarium Penunjang Penelitian / Penelitian 1,540,000
Perekayasaan
1.10.28.01.99.005.010 Petugas Survey Honorarium Penunjang Penelitian / Orang/Respo 8,000
Perekayasaan nden
1.10.28.01.99.005.011 Pembantu Lapangan Honorarium Penunjang Penelitian / OH 80,000
Perekayasaan
1.10.28.01.99.006 Honorarium Koordinator Aplikasi
Keuangan Pada Satuan Kerja Perangkat
Daerah

1.10.28.01.99.006.001 Koordinator pemerintah Kota OB 700,000


Mojokerto (SKPKD)
1.10.28.01.99.006.002 Wakil Koordinator pemerintah Kota OB 600,000
Mojokerto (SKPKD)
1.10.28.02.02.001.029 Koordinator Aplikasi Keuangan Pada OB 500,000
Satuan Kerja Perangkat Daerah
(Operator SIMDA)
1.10.28.01.99.006.004 Anggota pada SKPD (Pemberian OB 400,000
Honorarium ini tidak boleh melebihi
bendahara pengeluaran/bendahara
pengeluaran pembantu)

1.10.28.01.99.007 Honorarium Unit Kerja Sekretariat


DPRD Kota Mojokerto

1.10.28.01.99.007.001 Honorarium Tenaga Ahli Honorarium Unit Kerja Sekretariat OB 2,750,000


DPRD DPRD Kota Mojokerto
1.10.28.01.99.007.002 Honorarium Pengukuh Honorarium Unit Kerja Sekretariat OK 1,500,000
Sumpah/Pejabat yang melantik DPRD Kota Mojokerto
1.10.28.01.99.007.003 Honorarium Rohaniawan Honorarium Unit Kerja Sekretariat OK 500,000
DPRD Kota Mojokerto
1.10.28.01.99.007.004 Honorarium Tenaga Administrasi Honorarium Unit Kerja Sekretariat OB 2,500,000
Pimpinan DPRD DPRD Kota Mojokerto
1.10.28.01.99.099 Honorarium Umum Lain - lain
1.10.28.01.99.099.001 Tunjangan Kesehatan PMK OB 400,000

1.10.28.01.99.099.002 Uang jaga/piket Hari Raya OK 100,000

1.10.28.01.99.099.003 Uang kejadian kebakaran Regu/Keg 500,000

1.10.28.01.99.099.004 Honorarium Pengawas Pengangkut OB 250,000


Sampah
1.10.28.01.99.099.005 Honorarium Pengawas Penyapu Jalan OB 250,000

1.10.28.01.99.099.006 Honorarium Pengawas Pemelihara OB 250,000


Taman
1.10.28.01.99.099.007 Honorarium Pemelihara PJU OB 250,000

319
KODE URAIAN SPESIFIKASI SAT. HARGA SAT.
a b c d e
1.10.28.01.99.099.008 Honorarium Pengawas Pemelihara OB 250,000
Saluran
1.10.28.02 Upah/Jasa
1.10.28.02.01 Upah/Jasa Sektor Fisik
1.10.28.02.01.001 Upah/Jasa Tenaga Kerja Terampil
(Terlatih)
1.10.28.02.01.001.001 Upah Mandor OH 130,000

1.10.28.02.01.001.002 Upah Kepala Tukang OH 120,000

1.10.28.02.01.001.003 Upah Surveyor Geodesi OH 120,000

1.10.28.02.01.001.004 Tukang Kayu OH 110,000

1.10.28.02.01.001.005 Tukang Cat OH 110,000

1.10.28.02.01.001.006 Tukang Batu OH 110,000

1.10.28.02.01.001.007 Tukang Aspal OH 110,000

1.10.28.02.01.001.008 Tukang Besi OH 110,000

1.10.28.02.01.001.009 Tukang Pipa OH 110,000

1.10.28.02.01.001.010 Tukang Gali Tanah OH 110,000

1.10.28.02.01.001.011 Tukang Gali Jalan OH 110,000

1.10.28.02.01.001.012 Tukang Gali Lumpur OH 110,000

1.10.28.02.01.001.013 Tukang Las OH 110,000

1.10.28.02.01.001.014 Tukang Taman OH 110,000

1.10.28.02.01.001.015 Upah Operator Alat Berat OH 110,000

1.10.28.02.01.001.016 Upah Sopir OH 110,000

1.10.28.02.01.001.017 Upah Bor Master OH 110,000

1.10.28.02.01.001.018 Upah Mekanik OH 100,000

1.10.28.02.01.001.019 Upah Juru ukur OH 100,000

1.10.28.02.01.001.020 Upah Colter dan Kalibrasi OH 425,000

1.10.28.02.01.001.021 Upah Operator Alat Ringan OH 85,000

1.10.28.02.01.001.022 Tukang Listrik OH 110,000

1.10.28.02.01.001.023 Instalator Titik 150,000

1.10.28.02.01.002 Upah/Jasa Tenaga Kerja Tak Terampil Kategori Umum


(Tidak Terlatih)
1.10.28.02.01.002.001 Upah Pekerja (Tak Terampil) Operator Pompa;Pembantu Sopir; OH 90,000
Pembantu Mekanik; Pembantu Juru
Ukur; Pembantu Operator Alat Berat;
Pembantu Surveyor; dan Sejenis nya

1.10.28.02.01.003 Upah/Jasa Kegiatan Pemeliharaan

1.10.28.02.01.003.001 Pemeliharaan AC Ganti Kompresor AC Windows 1 PK Unit 1,000,000


(Include: Jasa dan Isi Freon)

320
KODE URAIAN SPESIFIKASI SAT. HARGA SAT.
a b c d e
1.10.28.02.01.003.002 Pemeliharaan AC Ganti Kompresor AC Windows 1,5 PK Unit 2,000,000
(Include: Jasa dan Isi Freon)
1.10.28.02.01.003.003 Pemeliharaan AC Ganti Kompresor AC Windows 2 PK Unit 4,000,000
(Include: Jasa dan Isi Freon)
1.10.28.02.01.003.004 Pemeliharaan AC Isi Freon AC Split 1/2 - 1 PK unit 150,000

1.10.28.02.01.003.005 Pemeliharaan AC Isi Freon AC Split 1,5 – 2 PK Unit 200,000

1.10.28.02.01.003.006 Pemeliharaan AC Isi Freon AC Split 2 – 2,5 PK Unit 350,000

1.10.28.02.01.003.007 Pemeliharaan AC Isi Freon AC Split 5 PK Unit 400,000

1.10.28.02.01.003.008 Pemeliharaan AC Isi Freon AC Cassete, sentral, Standing per PK 200,000

1.10.28.02.01.003.009 Pemeliharaan AC Isi Freon AC Split Inverter 1/2 - 2 PK unit 300,000

1.10.28.02.01.003.010 Pemeliharaan AC Isi Freon AC Window 1 PK unit 1,000,000

1.10.28.02.01.003.011 Pemeliharaan AC Tambah freon AC Split 1/2 - 2 PK unit 150,000

1.10.28.02.01.003.012 Pemeliharaan AC Tambah freon AC Cassete, sentral, Stand Per PK 150,000

1.10.28.02.01.003.013 Pemeliharaan AC Tambah freon AC Split Inverter 1/2 - 2 P unit 250,000

1.10.28.02.01.003.014 Pemeliharaan AC Cleaning / Cuci AC Split 1/2 - 1 unit 50,000

1.10.28.02.01.003.015 Pemeliharaan AC Cleaning / Cuci AC Split 2 – 2,5 PK unit 70,000

1.10.28.02.01.003.016 Pemeliharaan AC Cleaning / Cuci AC Cassete, sentral, Per PK 100,000


Standing
1.10.28.02.01.003.017 Pemeliharaan AC Pemeriksaan / Cek AC Split 1/2 - 2 PK unit 100,000

1.10.28.02.01.003.018 Pemeliharaan AC Pemeriksaan / Cek AC Cassete, sentral, unit 150,000


Standing
1.10.28.02.01.003.019 Pemeliharaan AC Jasa ganti sparepart kecil semua unit 150,000
jenis/tipe AC
1.10.28.02.01.003.020 Pemeliharaan AC Jasa ganti sparepart besar semua unit 200,000
jenis/tipe AC
1.10.28.02.01.003.021 Pemeliharaan AC Jasa ganti kompresor 1/2 - 2 PK unit 500,000

1.10.28.02.01.003.022 Pemeliharaan AC Jasa ganti kompresor 3 - 5 PK unit 1,500,000

1.10.28.02.01.003.023 Pemeliharaan AC las per titik semua jenis/tipe AC titik 100,000

1.10.28.02.01.003.024 Pemeliharaan AC Jasa Pasang AC 1/2 - 2 PK unit 250,000

1.10.28.02.01.003.025 Pemeliharaan AC Jasa Pasang AC 3 - 5 PK unit 1,500,000

1.10.28.02.01.003.026 Pemeliharaan AC Jasa Bongkar AC 1/2 - 2 PK unit 200,000

1.10.28.02.01.003.027 Pemeliharaan AC Jasa Bongkar AC 3 - 5 PK unit 500,000

1.10.28.02.01.003.028 Pemeliharaan AC Bobokan 1/2 - 1 PK per titik / m 100,000

1.10.28.02.01.003.029 Pemeliharaan AC Penggantian Capasitor 1,5 - 2 PK unit 275,000

1.10.28.02.01.003.030 Pemeliharaan AC Penggantian Capasitor 3 - 5 PK unit 325,000

1.10.28.02.01.003.031 Pemeliharaan AC Penggantian Overload semua jenis/tipe unit 375,000


AC
1.10.28.02.01.003.032 Pemeliharaan AC Penggantian Termistor semua unit 175,000
jenis/tipe AC
1.10.28.02.01.003.033 Pemeliharaan Komputer Service Komputer/Pengecekan PC Unit/Kali 100,000
semua jenis/tipe PC + jasa

321
KODE URAIAN SPESIFIKASI SAT. HARGA SAT.
a b c d e
1.10.28.02.01.003.034 Pemeliharaan Komputer Jasa Back Up Data Unit 100,000

1.10.28.02.01.003.035 Pemeliharaan Komputer Jasa Update Antivirus/Cleaning Virus Unit 75,000

1.10.28.02.01.003.036 Pemeliharaan Komputer Jasa Pembersihan PC dari debu Unit 50,000

1.10.28.02.01.003.037 Pemeliharaan Komputer Install Windows + Software Standar Unit/Kali 150,000


semua jenis/tipe PC + jasa
1.10.28.02.01.003.038 Pemeliharaan Komputer Install Windows + Software Standar + Unit/Kali 200,000
Setting Outlook semua jenis/tipe PC +
jasa
1.10.28.02.01.003.039 Pemeliharaan Komputer Install Windows + Software Standart + Unit/Kali 230,000
Back Up Data Data < 50 Gb + jasa

1.10.28.02.01.003.040 Pemeliharaan Komputer Install Windows + Software Standart + Unit/Kali 250,000


Back Up Data Data 50 - 60 Gb + jasa

1.10.28.02.01.003.041 Pemeliharaan Komputer Install Windows+Software Unit/Kali 310,000


Standart+Back Up Data Data 60 - 80 Gb
+ jasa
1.10.28.02.01.003.042 Pemeliharaan Komputer Install Windows + Software Standart + Unit/Kali 330,000
Back Up Data Data > 80 Gb + jasa

1.10.28.02.01.003.043 Pemeliharaan Komputer Install Program Desain - PHOTOSHOP Unit/Kali 75,000

1.10.28.02.01.003.044 Pemeliharaan Komputer Install Program Desain - CORELDRAW Unit/Kali 75,000

1.10.28.02.01.003.045 Pemeliharaan Komputer Install Program Desain - ACAD Unit/Kali 80,000

1.10.28.02.01.003.046 Pemeliharaan Komputer Install Program Desain - 3D MAX Unit/Kali 80,000

1.10.28.02.01.003.047 Pemeliharaan Komputer Service Laptop / Pengecekan + Bongkar Unit/Kali 150,000


Semua jenis / tipe laptop + Jasa

1.10.28.02.01.003.048 Pemeliharaan Komputer Service + Ganti fun Semua jenis / tipe Unit/Kali 350,000
laptop + Jasa
1.10.28.02.01.003.049 Pemeliharaan Komputer Install Windows + Software Standar Unit/Kali 150,000
semua jenis/tipe PC + jasa
1.10.28.02.01.003.050 Pemeliharaan Komputer Install Windows + Software Standar + Unit/Kali 200,000
Setting Outlook semua jenis/tipe PC +
jasa
1.10.28.02.01.003.051 Pemeliharaan Komputer Install Windows+Software Unit/Kali 230,000
Standart+Back Up Data Data < 50 Gb +
jasa
1.10.28.02.01.003.052 Pemeliharaan Komputer Install Windows+Software Unit/Kali 250,000
Standart+Back Up Data Data 50 - 60 Gb
+ jasa
1.10.28.02.01.003.053 Pemeliharaan Komputer Install Windows+Software Unit/Kali 310,000
Standart+Back Up Data Data 60 - 80 Gb
+ jasa
1.10.28.02.01.003.054 Pemeliharaan Komputer Install Windows+Software Unit/Kali 330,000
Standart+Back Up Data Data > 80 Gb +
jasa
1.10.28.02.01.003.055 Pemeliharaan Komputer/Printer Setting LAN dan Sharing data - Printer Unit 125,000
Semua jenis/tipe PC
1.10.28.02.01.003.056 Pemeliharaan Komputer/Printer Instalasi LAN dan Sharing data - Printer Unit 350,000
Semua jenis/tipe PC
1.10.28.02.01.003.057 Pemeliharaan Kendaraan (Service Ganti Busi (Include Jasa); Setara Honda Unit 2,230,800
Rutin) Accord Type CP3 3500cc
1.10.28.02.01.003.058 Pemeliharaan Kendaraan (Service Ganti Filter Bensin (Include Jasa); Unit 764,500
Rutin) Setara Honda Accord Type CP3 3500cc

1.10.28.02.01.003.059 Pemeliharaan Kendaraan (Service Ganti Filter Udara (Include Jasa); Setara Unit 359,700
Rutin) Honda Accord Type CP3 3500cc

322
KODE URAIAN SPESIFIKASI SAT. HARGA SAT.
a b c d e
1.10.28.02.01.003.060 Pemeliharaan Kendaraan (Service Ganti O.Injektor/s (Include Jasa); Setara Unit 928,400
Rutin) Honda Accord Type CP3 3500cc

1.10.28.02.01.003.061 Pemeliharaan Kendaraan (Service Ganti Filter AC (Include Jasa); Setara Unit 300,300
Rutin) Honda Accord Type CP3 3500cc

1.10.28.02.01.003.062 Pemeliharaan Kendaraan (Service Ganti Busi (Include Jasa); Setara Honda Unit 101,200
Rutin) CR-V Type RE3 2400cc
1.10.28.02.01.003.063 Pemeliharaan Kendaraan (Service Ganti Filter Bensin (Include Jasa); Unit 1,008,700
Rutin) Setara Honda CR-V Type RE3 2400cc

1.10.28.02.01.003.064 Pemeliharaan Kendaraan (Service Ganti Filter Udara (Include Jasa); Setara Unit 199,100
Rutin) Honda CR-V Type RE3 2400cc

1.10.28.02.01.003.065 Pemeliharaan Kendaraan (Service Ganti O.Injektor/s (Include Jasa); Setara Unit 325,600
Rutin) Honda CR-V Type RE3 2400cc

1.10.28.02.01.003.066 Pemeliharaan Kendaraan (Service Ganti Filter AC (Include Jasa); Setara Unit 300,300
Rutin) Honda CR-V Type RE3 2400cc

1.10.28.02.01.003.067 Pemeliharaan Kendaraan - Service Biaya Jasa+Part; Setara Avanza Unit 849,000
Berkala Per 10.000/70.000/90.000 KM

1.10.28.02.01.003.068 Pemeliharaan Kendaraan - Service Biaya Jasa+Part; Setara Avanza Unit 888,000
Berkala Per 20.000/60.000/140.000 KM

1.10.28.02.01.003.069 Pemeliharaan Kendaraan - Service Biaya Jasa+Part; Setara Avanza Unit 849,000
Berkala Per 30.000/50.000 KM
1.10.28.02.01.003.070 Pemeliharaan Kendaraan - Service Biaya Jasa+Part; Setara Avanza Unit 1,544,000
Berkala Per 40.000 KM
1.10.28.02.01.003.071 Pemeliharaan Kendaraan - Service Biaya Jasa+Part; Setara Avanza Unit 1,640,000
Berkala Per 80.000/240.000 KM
1.10.28.02.01.003.072 Pemeliharaan Kendaraan - Service Biaya Jasa+Part; Setara Avanza Unit 1,248,000
Berkala Per 100.000/300.000 KM
1.10.28.02.01.003.073 Pemeliharaan Kendaraan - Service Biaya Jasa+Part; Setara Rush Unit 996,000
Berkala Per 10.000 KM
1.10.28.02.01.003.074 Pemeliharaan Kendaraan - Service Biaya Jasa+Part; Setara Rush Unit 1,155,000
Berkala Per 20.000/100.000/300.000
KM
1.10.28.02.01.003.075 Pemeliharaan Kendaraan - Service Biaya Jasa+Part; Setara Rush Unit 2,489,000
Berkala Per 30.000/50.000 KM
1.10.28.02.01.003.076 Pemeliharaan Kendaraan - Service Biaya Jasa+Part; Setara Rush Unit 1,816,000
Berkala Per 40.000 KM
1.10.28.02.01.003.077 Pemeliharaan Kendaraan - Service Biaya Jasa+Part; Setara Rush Unit 1,861,000
Berkala Per 60.000/140.000 KM
1.10.28.02.01.003.078 Pemeliharaan Kendaraan - Service Biaya Jasa+Part; Setara Rush Unit 2,844,000
Berkala Per 70.000/90.000 KM
1.10.28.02.01.003.079 Pemeliharaan Kendaraan - Service Biaya Jasa+Part; Setara Rush Unit 2,649,000
Berkala Per 80.000/240.000 KM
1.10.28.02.01.003.080 Pemeliharaan Kendaraan - Service Biaya Jasa+Part; Setara Innova Unit 1,249,000
Berkala Per 10.000/30.000/50.000 KM

1.10.28.02.01.003.081 Pemeliharaan Kendaraan - Service Biaya Jasa+Part; Setara Innova Unit 1,409,000
Berkala Per 20.000 KM
1.10.28.02.01.003.082 Pemeliharaan Kendaraan - Service Biaya Jasa+Part; Setara Innova Unit 2,278,000
Berkala Per 40.000 KM
1.10.28.02.01.003.083 Pemeliharaan Kendaraan - Service Biaya Jasa+Part; Setara Innova Unit 1,440,000
Berkala Per 60.000/140.000 KM
1.10.28.02.01.003.084 Pemeliharaan Kendaraan - Service Biaya Jasa+Part; Setara Innova Unit 1,283,000
Berkala Per 70.000/90.000 KM
1.10.28.02.01.003.085 Pemeliharaan Kendaraan - Service Biaya Jasa+Part; Setara Innova Unit 2,658,000
Berkala Per 80.000/240.000 KM
1.10.28.02.01.003.086 Pemeliharaan Kendaraan - Service Biaya Jasa+Part; Setara Innova Unit 1,611,000
Berkala Per 100.000/300.000 KM

323
KODE URAIAN SPESIFIKASI SAT. HARGA SAT.
a b c d e
1.10.28.02.01.003.087 Pemeliharaan Kendaraan - Service Biaya Jasa+Part; Setara Fortuner Unit 1,724,000
Berkala Per 10.000/30.000/50.000 KM

1.10.28.02.01.003.088 Pemeliharaan Kendaraan - Service Biaya Jasa+Part; Setara Fortuner Unit 1,906,000
Berkala Per 20.000 KM
1.10.28.02.01.003.089 Pemeliharaan Kendaraan - Service Biaya Jasa+Part; Setara Fortuner Unit 2,847,000
Berkala Per 40.000 KM
1.10.28.02.01.003.090 Pemeliharaan Kendaraan - Service Biaya Jasa+Part; Setara Fortuner Unit 1,937,000
Berkala Per 60.000/140.000 KM
1.10.28.02.01.003.091 Pemeliharaan Kendaraan - Service Biaya Jasa+Part; Setara Fortuner Unit 1,758,000
Berkala Per 70.000/90.000 KM
1.10.28.02.01.003.092 Pemeliharaan Kendaraan - Service Biaya Jasa+Part; Setara Fortuner Unit 3,367,000
Berkala Per 80.000/240.000 KM
1.10.28.02.01.003.093 Pemeliharaan Kendaraan - Service Biaya Jasa+Part; Setara Fortuner Unit 1,611,000
Berkala Per 100.000/300.000 KM
1.10.28.02.01.003.094 Pemeliharaan Kendaraan - Service Biaya Jasa+Part; Setara Camry Unit 1,683,000
Berkala Per 10.000/30.000/50.000 KM

1.10.28.02.01.003.095 Pemeliharaan Kendaraan - Service Biaya Jasa+Part; Setara Camry Unit 1,869,000
Berkala Per 20.000 KM
1.10.28.02.01.003.096 Pemeliharaan Kendaraan - Service Biaya Jasa+Part; Setara Camry Unit 2,363,000
Berkala Per 40.000 KM
1.10.28.02.01.003.097 Pemeliharaan Kendaraan - Service Biaya Jasa+Part; Setara Camry Unit 1,859,000
Berkala Per 60.000/140.000 KM
1.10.28.02.01.003.098 Pemeliharaan Kendaraan - Service Biaya Jasa+Part; Setara Camry Unit 1,673,000
Berkala Per 70.000/90.000 KM
1.10.28.02.01.003.099 Pemeliharaan Kendaraan - Service Biaya Jasa+Part; Setara Camry Unit 3,223,000
Berkala Per 80.000/240.000 KM
1.10.28.02.01.003.100 Pemeliharaan Kendaraan - Service Biaya Jasa+Part; Setara Camry Unit 2,991,000
Berkala Per 100.000/300.000 KM
1.10.28.02.01.003.101 Pemeliharaan Kendaraan - Service Biaya Jasa+Part; Setara Hilux Unit 1,108,000
Berkala Per 10.000/30.000/50.000 KM

1.10.28.02.01.003.102 Pemeliharaan Kendaraan - Service Biaya Jasa+Part; Setara Hilux Unit 1,185,000
Berkala Per 20.000 KM
1.10.28.02.01.003.103 Pemeliharaan Kendaraan - Service Biaya Jasa+Part; Setara Hilux Unit 2,198,000
Berkala Per 40.000 KM
1.10.28.02.01.003.104 Pemeliharaan Kendaraan - Service Biaya Jasa+Part; Setara Hilux Unit 1,265,000
Berkala Per
60.000/100.000/140.000/300.000 KM

1.10.28.02.01.003.105 Pemeliharaan Kendaraan - Service Biaya Jasa+Part; Setara Hilux Unit 1,133,000
Berkala Per 70.000/90.000 KM
1.10.28.02.01.003.106 Pemeliharaan Kendaraan - Service Biaya Jasa+Part; Setara Hilux Unit 2,464,000
Berkala Per 80.000/240.000 KM
1.10.28.02.01.003.107 Pemeliharaan Kendaraan - Penggantian Biaya Ganti Clutch (Jasa+Part); Setara Unit 2,003,000
Suku Cadang Avanza
1.10.28.02.01.003.108 Pemeliharaan Kendaraan - Penggantian Biaya Ganti Shock Absorber Depan 1 Unit 1,221,000
Suku Cadang Sisi (Jasa+Part); Setara Avanza
1.10.28.02.01.003.109 Pemeliharaan Kendaraan - Penggantian Biaya Ganti Shock Absorber Belakang 1 Unit 552,000
Suku Cadang Sisi (Jasa+Part); Setara Avanza

1.10.28.02.01.003.110 Pemeliharaan Kendaraan - Penggantian Biaya Ganti Clutch (Jasa+Part); Setara Unit 2,003,000
Suku Cadang Rush
1.10.28.02.01.003.111 Pemeliharaan Kendaraan - Penggantian Biaya Ganti Shock Absorber Depan 1 Unit 1,381,000
Suku Cadang Sisi (Jasa+Part); Setara Rush
1.10.28.02.01.003.112 Pemeliharaan Kendaraan - Penggantian Biaya Ganti Shock Absorber Belakang 1 Unit 609,000
Suku Cadang Sisi (Jasa+Part); Setara Rush

1.10.28.02.01.003.113 Pemeliharaan Kendaraan - Penggantian Biaya Ganti Clutch (Jasa+Part); Setara Unit 4,055,000
Suku Cadang Innova
1.10.28.02.01.003.114 Pemeliharaan Kendaraan - Penggantian Biaya Ganti Shock Absorber Depan 1 Unit 2,214,000
Suku Cadang Sisi (Jasa+Part); Setara Innova

324
KODE URAIAN SPESIFIKASI SAT. HARGA SAT.
a b c d e
1.10.28.02.01.003.115 Pemeliharaan Kendaraan - Penggantian Biaya Ganti Shock Absorber Belakang 1 Unit 559,000
Suku Cadang Sisi (Jasa+Part); Setara Innova

1.10.28.02.01.003.116 Pemeliharaan Kendaraan - Penggantian Biaya Ganti Clutch (Jasa+Part); Setara Unit 4,473,000
Suku Cadang Fortuner
1.10.28.02.01.003.117 Pemeliharaan Kendaraan - Penggantian Biaya Ganti Shock Absorber Depan 1 Unit 2,408,000
Suku Cadang Sisi (Jasa+Part); Setara Fortuner
1.10.28.02.01.003.118 Pemeliharaan Kendaraan - Penggantian Biaya Ganti Shock Absorber Belakang 1 Unit 662,000
Suku Cadang Sisi (Jasa+Part); Setara Fortuner

1.10.28.02.01.003.119 Pemeliharaan Kendaraan - Penggantian Biaya Ganti Clutch (Jasa+Part); Setara Unit 3,934,000
Suku Cadang Camry
1.10.28.02.01.003.120 Pemeliharaan Kendaraan - Penggantian Biaya Ganti Shock Absorber Depan 1 Unit 2,978,000
Suku Cadang Sisi (Jasa+Part); Setara Camry
1.10.28.02.01.003.121 Pemeliharaan Kendaraan - Penggantian Biaya Ganti Shock Absorber Belakang 1 Unit 3,243,000
Suku Cadang Sisi (Jasa+Part); Setara Camry

1.10.28.02.01.003.122 Pemeliharaan Kendaraan - Penggantian Biaya Ganti Clutch (Jasa+Part); Setara Unit 4,283,000
Suku Cadang Hilux
1.10.28.02.01.003.123 Pemeliharaan Kendaraan - Penggantian Biaya Ganti Shock Absorber Depan 1 Unit 2,135,000
Suku Cadang Sisi (Jasa+Part); Setara Hilux
1.10.28.02.01.003.124 Pemeliharaan Kendaraan - Penggantian Biaya Ganti Shock Absorber Belakang 1 Unit 477,000
Suku Cadang Sisi (Jasa+Part); Setara Hilux

1.10.28.02.01.003.125 Pemeliharaan Kendaraan - Service Biaya Jasa+Part; Setara Vios Unit 1,109,000
Berkala Per
10.000/30.000/50.000/70.000/90.000
KM
1.10.28.02.01.003.126 Pemeliharaan Kendaraan - Service Biaya Jasa+Part; Setara Vios Unit 1,160,000
Berkala Per
20.000/60.000/140.000/100.000/300.0
00 KM
1.10.28.02.01.003.127 Pemeliharaan Kendaraan - Service Biaya Jasa+Part; Setara Vios Unit 1,847,000
Berkala Per 40.000 KM
1.10.28.02.01.003.128 Pemeliharaan Kendaraan - Service Biaya Jasa+Part; Setara Vios Unit 2,217,000
Berkala Per 80.000/240.000 KM
1.10.28.02.01.003.129 Pemeliharaan Kendaraan - Penggantian Biaya Ganti Clutch (Jasa+Part); Setara Unit 4,344,000
Suku Cadang Vios
1.10.28.02.01.003.130 Pemeliharaan Kendaraan - Penggantian Biaya Ganti Shock Absorber Depan 1 Unit 2,211,000
Suku Cadang Sisi (Jasa+Part); Setara Vios
1.10.28.02.01.003.131 Pemeliharaan Kendaraan - Penggantian Biaya Ganti Shock Absorber Belakang 1 Unit 1,348,000
Suku Cadang Sisi (Jasa+Part); Setara Vios

1.10.28.02.01.003.132 Pemeliharaan Fingerprint Biaya Service Fingerprint semua jenis / Unit 250,000
tipe non transport
1.10.28.02.01.003.133 Pemeliharaan Fingerprint Biaya Backup Mesin Absen semua jenis Unit 300,000
/ tipe non transport
1.10.28.02.01.003.134 Pemeliharaan Fingerprint Biaya Penggantian Sparepart Casing Unit 800,000
Fingerprint (Include Jasa+Part)

1.10.28.02.01.003.135 Pemeliharaan Alat Vitek 2 Compact Unit 7,567,560

1.10.28.02.01.003.136 Refil catridge tipe 85A, 83A, 35A + Jasa Pemeliharaan Printer Unit 69,000

1.10.28.02.01.003.137 Refil catridge tipe 49A, 05A, 80A + Jasa Pemeliharaan Printer Unit 115,000

1.10.28.02.01.003.138 Refil catridge tipe HL 1000 + Jasa Pemeliharaan Printer Unit 143,750

1.10.28.02.01.003.139 Refil catridge tipe DR 2255 + Jasa Pemeliharaan Printer Unit 172,500

1.10.28.02.01.003.140 Refil catridge tipe ML1915, 3155, 1660 Pemeliharaan Printer Unit 149,500
+ Jasa
1.10.28.02.01.003.141 Refil catridge tipe CP1025 + Jasa Pemeliharaan Printer Unit 201,250

325
KODE URAIAN SPESIFIKASI SAT. HARGA SAT.
a b c d e
1.10.28.02.01.003.142 Refil catridge tipe PRO200 + Jasa Pemeliharaan Printer Unit 316,250

1.10.28.02.01.003.143 Refil catridge tipe 26A + Jasa Pemeliharaan Printer Unit 143,750

1.10.28.02.01.003.144 Refil catridge tipe 17A + Jasa Pemeliharaan Printer Unit 115,000

1.10.28.02.01.003.145 Refill Dry Chemical Powder Pemeliharaan Tabung Pemadam Kebaka kg 40,000

1.10.28.02.01.003.146 Refill Carbon Dioxide (CO2) Pemeliharaan Tabung Pemadam Kebaka kg 45,000

1.10.28.02.01.003.147 Refill Foam (AFFF) AB dan liquid Pemeliharaan Tabung Pemadam Kebaka kg 40,000

1.10.28.02.01.003.148 Refill Liquid Gas HCFC Pemeliharaan Tabung Pemadam Kebaka kg 275,000

1.10.28.02.01.003.149 Pemeliharaan Genset lebih kecil dari 50 KVa Unit/Tahun 7,190,000

1.10.28.02.01.003.150 Pemeliharaan Genset 75 KVA Unit/Tahun 8,640,000

1.10.28.02.01.003.151 Pemeliharaan Genset 100 KVA Unit/Tahun 10,150,000

1.10.28.02.01.003.152 Pemeliharaan Genset 125 KVA Unit/Tahun 10,780,000

1.10.28.02.01.003.153 Pemeliharaan Genset 150 KVA Unit/Tahun 13,260,000

1.10.28.02.01.003.154 Pemeliharaan Genset 175 KVA Unit/Tahun 14,810,000

1.10.28.02.01.003.155 Pemeliharaan Genset 200 KVA Unit/Tahun 15,850,000

1.10.28.02.01.003.156 Pemeliharaan Genset 250 KVA Unit/Tahun 16,790,000

1.10.28.02.01.003.157 Pemeliharaan Genset 275 KVA Unit/Tahun 17,760,000

1.10.28.02.01.003.158 Pemeliharaan Genset 300 KVA Unit/Tahun 20,960,000

1.10.28.02.01.003.159 Pemeliharaan Genset 350 KVA Unit/Tahun 22,960,000

1.10.28.02.01.003.160 Pemeliharaan Genset 450 KVA Unit/Tahun 25,620,000

1.10.28.02.01.003.161 Pemeliharaan Genset 500 KVA Unit/Tahun 31,770,000

1.10.28.02.01.003.162 Pengisian Ulang Alat Pemadam Pemeliharaan Tabung Pemadam Kebaka Kg 750,000
Kebakaran Halotron 1
1.10.28.02.01.003.163 Pengisian Ulang Alat Pemadam Pemeliharaan Tabung Pemadam Kebaka Kg 650,000
Kebakaran AF11
1.10.28.02.01.003.164 Perbaikan Alat Autoclave (tekanan pada Pemeliharaan Alat Kesehatan Unit 2,000,000
alat tidak bisa naik)
1.10.28.02.01.003.165 Perbaikan Alat Hot Plate (pemanas Pemeliharaan Alat Kesehatan Unit 2,000,000
tidak berfungsi)
1.10.28.02.01.003.166 Pemeliharaan Kulkas/Lemari Pendingin isi freon dan service Unit 2,000,000

1.10.28.02.01.003.167 Perbaikan Alat Turbidimeter (alat tidak Pemeliharaan Alat Kesehatan Unit 2,000,000
bisa membaca sampel)
1.10.28.02.01.003.168 Perbaikan Alat Waterbath (suhu alat Pemeliharaan Alat Kesehatan Unit 2,000,000
tidak berfungsi)
1.10.28.02.01.003.169 Pemeliharaan Meubelair Perbaikan / plitur meja kursi kantor Unit / set 150,000

1.10.28.02.01.003.170 Pemeliharaan Meubelair Pasang Bekled (Jok) Kursi Unit / buah 400,000

1.10.28.02.01.003.171 Pemeliharaan service sound system Peralatan Kantor Unit 250,000

1.10.28.02.01.003.172 Pemeliharaan service RIG, HT, Repiter Peralatan Kantor Unit 150,000

1.10.28.02.01.003.173 Pemeliharaan service mesin ketik Peralatan Kantor Unit 150,000

326
KODE URAIAN SPESIFIKASI SAT. HARGA SAT.
a b c d e
1.10.28.02.01.003.174 Pemeliharaan service mesin penghancu Peralatan Kantor Unit 150,000

1.10.28.02.01.003.175 Pemeliharaan service mesin fax Peralatan Kantor Unit 250,000

1.10.28.02.01.003.176 Pemeliharaan service mesin fotocopy Peralatan Kantor Unit 350,000

1.10.28.02.01.003.177 Pemeliharaan service kamera digital Peralatan Kantor Unit 500,000

1.10.28.02.01.003.178 Pemeliharaan/Perawatan Videotron Regular checking, maintenance dan Tahun 30,000,000


LED Display trouble shooting
1.10.28.02.01.003.179 Pemeliharaan Peralatan Jaringan dan Instalasi Jaringan Titik 500,000
Telekomunikasi
1.10.28.02.01.003.180 Pemeliharaan Smoke Tester Alat Uji Kendaraan Unit/Tahun 10,000,000

1.10.28.02.01.003.181 Pemeliharaan Gas Analizer Alat Uji Kendaraan Unit/Tahun 10,000,000

1.10.28.02.01.003.182 Pemeliharaan Side Slip Tester Alat Uji Kendaraan Unit/Tahun 10,000,000

1.10.28.02.01.003.183 Pemeliharaan Head Lamp Tester Alat Uji Kendaraan Unit/Tahun 6,000,000

1.10.28.02.01.003.184 Pemeliharaan Loadcell Tester Alat Uji Kendaraan Unit/Tahun 11,000,000

1.10.28.02.01.003.185 Pemeliharaan Break Tester Alat Uji Kendaraan Unit/Tahun 11,000,000

1.10.28.02.01.003.186 Pemeliharaan Spidometer Tester Alat Uji Kendaraan Unit/Tahun 9,000,000

1.10.28.02.01.003.187 Pemeliharaan Sound Level Tester Alat Uji Kendaraan Unit/Tahun 5,000,000

1.10.28.02.01.003.188 Pemeliharaan Playditector Alat Uji Kendaraan Unit/Tahun 8,000,000

1.10.28.02.01.003.189 Pemeliharaan Pintu Kaca Otomatis Unit 6,000,000

1.10.28.02.01.003.190 Pemeliharaan Televisi Unit 500,000

1.10.28.02.01.004 Satuan Biaya Kegiatan Pengujian

1.10.28.02.01.004.001 Biaya Kalibrasi Alat Uji Kendaraan Smoke Tester, Gas Analizer, Head Lamp Unit 1,000,000
Tester, Side Slip Tester, Loadcell Tester,
Break Tester, Spidometer Tester,
Sound Level Tester

1.10.28.02.01.004.002 Biaya Pengujian Emisi Sumber Tidak Jasa + Bahan Uji (parameter yang diuji: titik 4,050,000
Bergerak (Cerobong) SO2, Debu,Opasitas dan Laju Air
(pengukuran 15 menit)
1.10.28.02.01.004.003 Biaya Pengujian Udara Ambien Jasa + Bahan Uji (parameter yang diuji: titik 2,725,000
SO2, H2S, CO,NH3, Debu, Suhu RH, Pb,
Hc)
1.10.28.02.01.004.004 Biaya Pengujian Air Badan Air Jasa + Bahan Uji (parameter yang diuji: titik 1,500,000
pH, BOD, COD,DO,PO4,NH3-
N,Cu,Fe,SO4,Cl2,Total Coliform,Fecal
Coliform)
1.10.28.02.01.004.005 Biaya Pengujian Limbah Padat/Slugde Jasa + Bahan Uji (parameter yang diuji : titik 2,500,000
Cu, Pb,Cd,Hg,Co
1.10.28.02.01.004.006 Biaya Pengujian Air Limbah Industri Jasa + Bahan Uji (parameter yang diuji : titik 1,500,000
(Inlet dan Outlet) H2S,PO4,NH3-N,BOD,COD,Minyak
lemak
1.10.28.02.01.004.007 Biaya Pengujian Air Hujan Konduktifitas, SO4,NO3,Cr,NH4 total titik 1,400,000

1.10.28.02.01.004.008 Biaya Kalibrasi Alat Inkubator Unit 800,000

1.10.28.02.01.004.009 Biaya Kalibrasi Alat Autoclave Unit 900,000

1.10.28.02.01.004.010 Biaya Kalibrasi Alat Timbangan Analitik Unit 600,000

327
KODE URAIAN SPESIFIKASI SAT. HARGA SAT.
a b c d e
1.10.28.02.01.004.011 Biaya Kalibrasi Alat Waterbath Unit 750,000

1.10.28.02.01.004.012 Biaya Kalibrasi Alat Oven Unit 800,000

1.10.28.02.01.004.013 Biaya Kalibrasi Alat Thermoreaktor Unit 700,000

1.10.28.02.01.004.014 Biaya Kalibrasi Alat pH Meter Unit 600,000

1.10.28.02.01.004.015 Biaya Kalibrasi Alat DHL Unit 2,000,000

1.10.28.02.01.004.016 Biaya Kalibrasi Alat Thermohygrometer Unit 900,000

1.10.28.02.01.004.017 Biaya Kalibrasi Alat Thermometer raksa Unit 800,000

1.10.28.02.01.004.018 Biaya Kalibrasi Alat Thermometer digital Unit 800,000

1.10.28.02.01.004.019 Biaya Kalibrasi Alat Spektrofotometer UV-Vis Unit 5,000,000

1.10.28.02.01.004.020 Biaya Kalibrasi Alat Anak Timbangan Unit 1,000,000

1.10.28.02.01.004.021 Biaya Kalibrasi Alat Turbidimeter Unit 2,000,000

1.10.28.02.01.004.022 Biaya Kalibrasi Alat Centrifuge Unit 990,000

1.10.28.02.01.004.023 Biaya Kalibrasi Alat Tensimeter Raksa Unit 950,000

1.10.28.02.01.004.024 Biaya Kalibrasi Alat Tensimeter Digital Unit 950,000

1.10.28.02.01.004.025 Biaya Kalibrasi Alat Timbangan Badan Unit 1,100,000

1.10.28.02.01.004.026 Biaya Kalibrasi Alat Lemari Es Unit 1,100,000

1.10.28.02.01.004.027 Biaya Kalibrasi Alat Lux Meter Unit 2,160,000

1.10.28.02.01.004.028 Biaya Kalibrasi Alat Sound Level Meter Unit 3,300,000

1.10.28.02.01.004.029 Biaya Kalibrasi Alat Buret Unit 685,000

1.10.28.02.01.004.030 Pemeriksaan Kimia Air Bersih Sampel 500,000

1.10.28.02.01.004.031 Pemeriksaan Mikrobiologi Air Bersih Sampel 150,000

1.10.28.02.01.004.032 Pemeriksaan Mikrobiologi Air Limbah MPN kuman gol. Coli Tinja/Faecal Coli Sampel 143,000
1.10.28.02.01.004.033 Pemeriksaan Mikrobiologi Air Limbah MPN kuman gol. Coli/Total Coliform Sampel 176,000

1.10.28.02.01.004.034 Pemeriksaan Usap Alat Medis Sampel 74,000

1.10.28.02.01.004.035 Pemeriksaan Usap Lantai/Dinding Sampel 74,000

1.10.28.02.01.004.036 Pemeriksaan Udara Ruang Sampel 400,000

1.10.28.02.01.004.037 Pemeriksaan Mutu Eksternal atau Uji Kimia klinik Paket 1,100,000
Profisiensi Pelayanan Laboratorium
Kesehatan
1.10.28.02.01.004.038 Pemeriksaan Mutu Eksternal atau Uji Hematologi Paket 1,100,000
Profisiensi Pelayanan Laboratorium
Kesehatan
1.10.28.02.01.004.039 Pemeriksaan Mutu Eksternal atau Uji Urinalisa Paket 900,000
Profisiensi Pelayanan Laboratorium
Kesehatan
1.10.28.02.01.004.040 Pemeriksaan Mutu Eksternal atau Uji Mikroskopis BTA Paket 600,000
Profisiensi Pelayanan Laboratorium
Kesehatan

328
KODE URAIAN SPESIFIKASI SAT. HARGA SAT.
a b c d e
1.10.28.02.01.004.041 Pemeriksaan Mutu Eksternal atau Uji Mikroskopis telur cacing Paket 350,000
Profisiensi Pelayanan Laboratorium
Kesehatan
1.10.28.02.01.004.042 Pemeriksaan Mutu Eksternal atau Uji Anti HIV Paket 1,400,000
Profisiensi Pelayanan Laboratorium
Kesehatan
1.10.28.02.01.004.043 Pemeriksaan Mutu Eksternal atau Uji Syphilis Paket 1,400,000
Profisiensi Pelayanan Laboratorium
Kesehatan
1.10.28.02.01.004.044 Pemeriksaan Mutu Eksternal atau Uji HbsAg Paket 1,300,000
Profisiensi Pelayanan Laboratorium
Kesehatan
1.10.28.02.01.004.045 Pemeriksaan Mutu Eksternal atau Uji Anti HCV Paket 1,300,000
Profisiensi Pelayanan Laboratorium
Kesehatan
1.10.28.02.01.004.046 Pemeriksaan Mutu Eksternal atau Uji Kimia air Paket 2,200,000
Profisiensi Pelayanan Laboratorium
Kesehatan
1.10.28.02.01.004.047 Pemeriksaan Mutu Eksternal atau Uji Kimia air terbatas Paket 900,000
Profisiensi Pelayanan Laboratorium
Kesehatan
1.10.28.02.01.004.048 Jasa Uji Mutu Obat Organoleptik Sampel 30,000

1.10.28.02.01.004.049 Jasa Uji Mutu Obat Penetapan kadar Sampel 500,000

1.10.28.02.01.004.050 Jasa Uji Mutu Obat Keseragaman kandungan Sampel 500,000

1.10.28.02.01.004.051 Jasa Uji Mutu Obat Uji dissolusi (spektrofotometri) Sampel 500,000

1.10.28.02.01.004.052 Jasa Uji Mutu Obat Keragaman bobot Sampel 60,000

1.10.28.02.01.004.053 Jasa Uji Mutu Obat pH Sampel 50,000

1.10.28.02.01.004.054 Jasa Uji Mutu Obat Volume Terpindahkan Sampel 60,000

1.10.28.02.01.004.055 Sampel Bahan Uji Lab Aspal Sampel 250,000

1.10.28.02.01.004.056 Uji Profisiensi Pemeriksaan Air Minum Sampel 3,831,800


dan Air Limbah
1.10.28.02.01.004.057 Uji Profisiensi Pemeriksaan Mutu Pelayanan Labkes (Kimia Klinik) Sampel 1,500,000
Eksternal
1.10.28.02.01.004.058 Uji Profisiensi Pemeriksaan Mutu Pelayanan Labkes (Hematologi) Sampel 1,900,000
Eksternal
1.10.28.02.01.004.059 Uji Profisiensi Pemeriksaan Mutu Pelayanan Labkes (Urinalisa) Sampel 1,500,000
Eksternal
1.10.28.02.01.004.060 Uji Profisiensi Pemeriksaan Mutu Pelayanan Labkes (Mikros BTA) Sampel 750,000
Eksternal
1.10.28.02.01.004.061 Uji Profisiensi Pemeriksaan Mutu Pelayanan Labkes (Telur Cacing) Sampel 750,000
Eksternal
1.10.28.02.01.004.062 Jasa Uji Sample Kain Sampel 2,500,000

1.10.28.02.01.004.063 Biaya Pengujian Emisi Asap Incenerator Sampel 4,500,000

1.10.28.02.01.005 Satuan Biaya Kegiatan Fisik Konstruksi

1.10.28.02.01.005.001 Biaya Perencanaan Teknis Konstruksi Nilai Pekerjaan s.d 100 Jt Paket 5,000,000

1.10.28.02.01.005.002 Biaya Perencanaan Teknis Konstruksi Nilai Pekerjaan s.d 250 Jt Paket 10,000,000

1.10.28.02.01.005.003 Biaya Perencanaan Teknis Konstruksi Nilai Pekerjaan s.d 500 Jt Paket 20,000,000

1.10.28.02.01.005.004 Biaya Perencanaan Teknis Konstruksi Nilai Pekerjaan s.d 750 Jt Paket 30,000,000

329
KODE URAIAN SPESIFIKASI SAT. HARGA SAT.
a b c d e
1.10.28.02.01.005.005 Biaya Perencanaan Teknis Konstruksi Nilai Pekerjaan s.d 1 milliar Paket 40,000,000

1.10.28.02.01.005.006 Biaya Perencanaan Teknis Konstruksi Nilai Pekerjaan s.d 1,50 milliar Paket 45,000,000

1.10.28.02.01.005.007 Biaya Perencanaan Teknis Konstruksi Nilai Pekerjaan s.d 2 milliar Paket 60,000,000

1.10.28.02.01.005.008 Biaya Perencanaan Teknis Konstruksi Nilai Pekerjaan s.d 2,50 milliar Paket 75,000,000

1.10.28.02.01.005.009 Biaya Perencanaan Teknis Konstruksi Nilai Pekerjaan s.d 3 milliar Paket 90,000,000

1.10.28.02.01.005.010 Biaya Perencanaan Teknis Konstruksi Nilai Pekerjaan s.d 3,50 milliar Paket 105,000,000

1.10.28.02.01.005.011 Biaya Perencanaan Teknis Konstruksi Nilai Pekerjaan s.d 4 milliar Paket 120,000,000

1.10.28.02.01.005.012 Biaya Perencanaan Teknis Konstruksi Nilai Pekerjaan s.d 4,50 milliar Paket 135,000,000

1.10.28.02.01.005.013 Biaya Perencanaan Teknis Konstruksi Nilai Pekerjaan s.d 5 milliar Paket 150,000,000

1.10.28.02.01.005.014 Biaya Perencanaan Teknis Konstruksi Nilai Pekerjaan s.d 5,50 milliar Paket 165,000,000

1.10.28.02.01.005.015 Biaya Perencanaan Teknis Konstruksi Nilai Pekerjaan s.d 6 milliar Paket 180,000,000

1.10.28.02.01.005.016 Biaya Perencanaan Teknis Konstruksi Nilai Pekerjaan s.d 6,50 milliar Paket 195,000,000

1.10.28.02.01.005.017 Biaya Perencanaan Teknis Konstruksi Nilai Pekerjaan s.d 7 milliar Paket 210,000,000

1.10.28.02.01.005.018 Biaya Perencanaan Teknis Konstruksi Nilai Pekerjaan s.d 8,50 milliar Paket 255,000,000

1.10.28.02.01.005.019 Biaya Perencanaan Teknis Konstruksi Nilai Pekerjaan s.d 9 milliar Paket 270,000,000

1.10.28.02.01.005.020 Biaya Perencanaan Teknis Konstruksi Nilai Pekerjaan s.d 9,50 milliar Paket 285,000,000

1.10.28.02.01.005.021 Biaya Perencanaan Teknis Konstruksi Nilai Pekerjaan s.d 10 milliar Paket 300,000,000

1.10.28.02.01.005.022 Biaya Perencanaan Teknis Konstruksi Nilai Pekerjaan s.d 20 milliar Paket 600,000,000

1.10.28.02.01.005.023 Biaya Perencanaan Teknis Konstruksi Nilai Pekerjaan s.d 30 milliar Paket 900,000,000

1.10.28.02.01.005.024 Biaya Perencanaan Teknis Konstruksi Nilai Pekerjaan s.d 40 milliar Paket 1,200,000,000

1.10.28.02.01.005.025 Biaya Perencanaan Teknis Konstruksi Nilai Pekerjaan s.d 50 milliar Paket 1,500,000,000

1.10.28.02.01.005.026 Biaya Perencanaan Teknis Konstruksi Nilai Pekerjaan diatas 50 milliar Paket 3,000,000,000

1.10.28.02.01.005.027 Biaya Pengawasan Teknis Konstruksi Nilai Pekerjaan s.d 100 Jt Paket 4,000,000

1.10.28.02.01.005.028 Biaya Pengawasan Teknis Konstruksi Nilai Pekerjaan s.d 250 Jt Paket 7,500,000

1.10.28.02.01.005.029 Biaya Pengawasan Teknis Konstruksi Nilai Pekerjaan s.d 500 Jt Paket 15,000,000

1.10.28.02.01.005.030 Biaya Pengawasan Teknis Konstruksi Nilai Pekerjaan s.d 750 Jt Paket 22,500,000

1.10.28.02.01.005.031 Biaya Pengawasan Teknis Konstruksi Nilai Pekerjaan s.d 1 milliar Paket 30,000,000

1.10.28.02.01.005.032 Biaya Pengawasan Teknis Konstruksi Nilai Pekerjaan s.d 1,50 milliar Paket 30,000,000

1.10.28.02.01.005.033 Biaya Pengawasan Teknis Konstruksi Nilai Pekerjaan s.d 2 milliar Paket 40,000,000

1.10.28.02.01.005.034 Biaya Pengawasan Teknis Konstruksi Nilai Pekerjaan s.d 2,50 milliar Paket 50,000,000

1.10.28.02.01.005.035 Biaya Pengawasan Teknis Konstruksi Nilai Pekerjaan s.d 3 milliar Paket 60,000,000

1.10.28.02.01.005.036 Biaya Pengawasan Teknis Konstruksi Nilai Pekerjaan s.d 3,50 milliar Paket 70,000,000

330
KODE URAIAN SPESIFIKASI SAT. HARGA SAT.
a b c d e
1.10.28.02.01.005.037 Biaya Pengawasan Teknis Konstruksi Nilai Pekerjaan s.d 4 milliar Paket 80,000,000

1.10.28.02.01.005.038 Biaya Pengawasan Teknis Konstruksi Nilai Pekerjaan s.d 4,50 milliar Paket 90,000,000

1.10.28.02.01.005.039 Biaya Pengawasan Teknis Konstruksi Nilai Pekerjaan s.d 5 milliar Paket 100,000,000

1.10.28.02.01.005.040 Biaya Pengawasan Teknis Konstruksi Nilai Pekerjaan s.d 5,50 milliar Paket 110,000,000

1.10.28.02.01.005.041 Biaya Pengawasan Teknis Konstruksi Nilai Pekerjaan s.d 6 milliar Paket 120,000,000

1.10.28.02.01.005.042 Biaya Pengawasan Teknis Konstruksi Nilai Pekerjaan s.d 6,50 milliar Paket 130,000,000

1.10.28.02.01.005.043 Biaya Pengawasan Teknis Konstruksi Nilai Pekerjaan s.d 7 milliar Paket 140,000,000

1.10.28.02.01.005.044 Biaya Pengawasan Teknis Konstruksi Nilai Pekerjaan s.d 8,50 milliar Paket 170,000,000

1.10.28.02.01.005.045 Biaya Pengawasan Teknis Konstruksi Nilai Pekerjaan s.d 9 milliar Paket 180,000,000

1.10.28.02.01.005.046 Biaya Pengawasan Teknis Konstruksi Nilai Pekerjaan s.d 9,50 milliar Paket 190,000,000

1.10.28.02.01.005.047 Biaya Pengawasan Teknis Konstruksi Nilai Pekerjaan s.d 10 milliar Paket 200,000,000

1.10.28.02.01.005.048 Biaya Pengawasan Teknis Konstruksi Nilai Pekerjaan s.d 20 milliar Paket 400,000,000

1.10.28.02.01.005.049 Biaya Pengawasan Teknis Konstruksi Nilai Pekerjaan s.d 30 milliar Paket 600,000,000

1.10.28.02.01.005.050 Biaya Pengawasan Teknis Konstruksi Nilai Pekerjaan s.d 40 milliar Paket 800,000,000

1.10.28.02.01.005.051 Biaya Pengawasan Teknis Konstruksi Nilai Pekerjaan s.d 50 milliar Paket 1,000,000,000

1.10.28.02.01.005.052 Biaya Pengawasan Teknis Konstruksi Nilai Pekerjaan diatas 50 milliar Paket 2,000,000,000

1.10.28.02.01.005.053 Biaya Administrasi Kegiatan Konstruksi Nilai Pekerjaan s.d 100 Jt Paket 5,000,000

1.10.28.02.01.005.054 Biaya Administrasi Kegiatan Konstruksi Nilai Pekerjaan s.d 250 Jt Paket 10,000,000

1.10.28.02.01.005.055 Biaya Administrasi Kegiatan Konstruksi Nilai Pekerjaan s.d 500 Jt Paket 20,000,000

1.10.28.02.01.005.056 Biaya Administrasi Kegiatan Konstruksi Nilai Pekerjaan s.d 750 Jt Paket 30,000,000

1.10.28.02.01.005.057 Biaya Administrasi Kegiatan Konstruksi Nilai Pekerjaan s.d 1 milliar Paket 40,000,000

1.10.28.02.01.005.058 Biaya Administrasi Kegiatan Konstruksi Nilai Pekerjaan s.d 1,50 milliar Paket 45,000,000

1.10.28.02.01.005.059 Biaya Administrasi Kegiatan Konstruksi Nilai Pekerjaan s.d 2 milliar Paket 60,000,000

1.10.28.02.01.005.060 Biaya Administrasi Kegiatan Konstruksi Nilai Pekerjaan s.d 2,50 milliar Paket 75,000,000

1.10.28.02.01.005.061 Biaya Administrasi Kegiatan Konstruksi Nilai Pekerjaan s.d 3 milliar Paket 90,000,000

1.10.28.02.01.005.062 Biaya Administrasi Kegiatan Konstruksi Nilai Pekerjaan s.d 3,50 milliar Paket 105,000,000

1.10.28.02.01.005.063 Biaya Administrasi Kegiatan Konstruksi Nilai Pekerjaan s.d 4 milliar Paket 120,000,000

1.10.28.02.01.005.064 Biaya Administrasi Kegiatan Konstruksi Nilai Pekerjaan s.d 4,50 milliar Paket 135,000,000

1.10.28.02.01.005.065 Biaya Administrasi Kegiatan Konstruksi Nilai Pekerjaan s.d 5 milliar Paket 150,000,000

1.10.28.02.01.005.066 Biaya Administrasi Kegiatan Konstruksi Nilai Pekerjaan s.d 5,50 milliar Paket 165,000,000

1.10.28.02.01.005.067 Biaya Administrasi Kegiatan Konstruksi Nilai Pekerjaan s.d 6 milliar Paket 180,000,000

1.10.28.02.01.005.068 Biaya Administrasi Kegiatan Konstruksi Nilai Pekerjaan s.d 6,50 milliar Paket 195,000,000

331
KODE URAIAN SPESIFIKASI SAT. HARGA SAT.
a b c d e
1.10.28.02.01.005.069 Biaya Administrasi Kegiatan Konstruksi Nilai Pekerjaan s.d 7 milliar Paket 210,000,000

1.10.28.02.01.005.070 Biaya Administrasi Kegiatan Konstruksi Nilai Pekerjaan s.d 8,50 milliar Paket 255,000,000

1.10.28.02.01.005.071 Biaya Administrasi Kegiatan Konstruksi Nilai Pekerjaan s.d 9 milliar Paket 270,000,000

1.10.28.02.01.005.072 Biaya Administrasi Kegiatan Konstruksi Nilai Pekerjaan s.d 9,50 milliar Paket 285,000,000

1.10.28.02.01.005.073 Biaya Administrasi Kegiatan Konstruksi Nilai Pekerjaan s.d 10 milliar Paket 300,000,000

1.10.28.02.01.005.074 Biaya Administrasi Kegiatan Konstruksi Nilai Pekerjaan s.d 20 milliar Paket 600,000,000

1.10.28.02.01.005.075 Biaya Administrasi Kegiatan Konstruksi Nilai Pekerjaan s.d 30 milliar Paket 900,000,000

1.10.28.02.01.005.076 Biaya Administrasi Kegiatan Konstruksi Nilai Pekerjaan s.d 40 milliar Paket 1,200,000,000

1.10.28.02.01.005.077 Biaya Administrasi Kegiatan Konstruksi Nilai Pekerjaan s.d 50 milliar Paket 1,500,000,000

1.10.28.02.01.005.078 Biaya Administrasi Kegiatan Konstruksi Nilai Pekerjaan diatas 50 milliar Paket 3,000,000,000

1.10.28.02.01.099 Upah/Jasa Sektor Fisik Lain - lain

1.10.28.02.02 Upah/Jasa Sektor Non Fisik


1.10.28.02.02.001 Upah/Jasa dengan Satuan
(Orang/Bulan)
1.10.28.02.02.001.001 Jasa Pengemudi/Sopir OB 1,800,000

1.10.28.02.02.001.002 Jasa Petugas Kebersihan, Pramubakti OB 1,700,000

1.10.28.02.02.001.003 Jasa Penyusun Naskah Sambutan Humas dan Protokol OB 300,000

1.10.28.02.02.001.004 Jasa Koordinator Humas dan Protokol OB 600,000

1.10.28.02.02.001.005 Jasa Anggota Humas dan Protokol OB 500,000

1.10.28.02.02.001.006 Jasa Pembuat naskah Pidato Kepala Humas dan Protokol OB 350,000
Daerah
1.10.28.02.02.001.007 Jasa Penyusun Release Humas dan Protokol OB 350,000

1.10.28.02.02.001.008 Jasa Pengelola Media Sosial Humas dan Protokol OB 350,000

1.10.28.02.02.001.009 Jasa Pengelola Videotrone Humas dan Protokol OB 350,000

1.10.28.02.02.001.010 Jasa Pemilah Arsip Petugas Arsip OB 350,000

1.10.28.02.02.001.011 Petugas tindak lanjut pelayanan Jasa Petugas Kesehatan OB 1,000,000


kesehatan
1.10.28.02.02.001.012 Tenaga Komunikator Jasa Petugas Kesehatan OB 1,500,000

1.10.28.02.02.001.013 Tenaga Verifikator Jasa Petugas Kesehatan OB 1,500,000

1.10.28.02.02.001.014 Jasa Peliputan Kegiatan Humas & Protokol OB 500,000

1.10.28.02.02.001.015 Jasa Technical Support Network OB 1,750,000

1.10.28.02.02.001.016 Jasa Network Administrator OB 3,500,000

1.10.28.02.02.001.017 Jasa Petugas penjaga TMP OB 1,800,000

1.10.28.02.02.001.018 Jasa Petugas Kebersihan kantor OB 1,700,000

1.10.28.02.02.001.019 Jasa Petugas Keamanan OB 1,800,000

332
KODE URAIAN SPESIFIKASI SAT. HARGA SAT.
a b c d e
1.10.28.02.02.001.020 Jasa Laundry Kesehatan OB 1,250,000

1.10.28.02.02.001.021 Jasa Juru Masak Rawat Inap OB 1,250,000

1.10.28.02.02.001.022 Jasa TAGANA ( Tanggap Bencana ) OB 200,000

1.10.28.02.02.001.023 Jasa Petugas Sandi OB 300,000

1.10.28.02.02.001.025 Jasa Pengawas Lapangan TPS OB 150,000

1.10.28.02.02.001.026 Jasa Petugas Analisa Data Base (ADB) OB 350,000


Kependudukan
1.10.28.02.02.001.028 Jasa Administrator Website OB 400,000

1.10.28.02.02.001.030 Jasa Tutor paket C OB 300,000

1.10.28.02.02.001.031 Jasa Tutor paket B OB 250,000

1.10.28.02.02.001.032 Jasa Pengelola Paket B/C OB 200,000

1.10.28.02.02.001.033 Jasa Penyelenggara Paket B/C OB 175,000

1.10.28.02.02.001.034 Jasa Tenaga Kerja Pembantu Penguji OB 2,000,000


Kendaraan Bermotor
1.10.28.02.02.001.035 Jasa Tenaga Kerja Operator ATCS OB 1,750,000

1.10.28.02.02.001.036 Jasa Tenaga Kerja Teknisi Perbengkelan OB 1,750,000

1.10.28.02.02.001.037 Jasa Petugas Juru Parkir OB 400,000

1.10.28.02.02.001.038 Upah/Jasa Manajer Telecenter OB 2,000,000

1.10.28.02.02.001.039 Upah/Jasa Sekretaris Telecenter Ijazah Min SMA/SMK; Kemampuan OB 1,600,000


bidang aplikasi perkantoran (MS Office
dan Internet)
1.10.28.02.02.001.040 Upah/Jasa Tenaga Kerja Bagian Ijazah Min SMA/SMK; Kemampuan OB 1,600,000
Pengembangan dan Pelayanan bidang aplikasi perkantoran (MS Office
Telecenter dan Internet)
1.10.28.02.02.001.041 Upah/Jasa Tenaga Kerja Bagian Ijazah Min SMA/SMK; Kemampuan OB 1,600,000
Teknologi Informasi Telecenter bidang aplikasi perkantoran (MS Office
dan Internet)
1.10.28.02.02.001.042 Honor Kader KB PPKBK OB 75,000

1.10.28.02.02.001.043 Honor Sub Kader KB PPKBK OB 50,000

1.10.28.02.02.001.044 Honor Tim P2TP2A OB 150,000

1.10.28.02.02.001.045 Honor Pengelola PIK OB 50,000

1.10.28.02.02.001.046 Honor Pembina Pramuka/Ekstra OK 150,000

1.10.28.02.02.001.047 Tenaga Kerja Perawatan Tanaman OB 750,000

1.10.28.02.02.001.048 Jasa Dokter Umum PTT Provinsi OB 2,500,000

1.10.28.02.02.001.049 Jasa Analisa Pemberitaan Media Massa bulan 16,500,000

1.10.28.02.02.001.050 Upah/Jasa Tenaga Kerja dibidang KeagamGuru TPQ, Guru Sekolah Minggu, OB 125,000
Coster, Mudin, Muadzin, Takmir
Masjid/Mushola, Pemandi Jenazah,
Penjaga Makam
1.10.28.02.02.001.051 Jurnalis OB 2,000,000

1.10.28.02.02.001.052 Reporter OB 2,750,000

333
KODE URAIAN SPESIFIKASI SAT. HARGA SAT.
a b c d e
1.10.28.02.02.001.053 Video Editor OB 2,750,000

1.10.28.02.02.002 Upah/Jasa dengan Satuan (Orang/Hari)

1.10.28.02.02.002.001 Moderator Jasa Pendukung Kegiatan Seminar/ OH 700,000


Rakor/ Sosialisasi/ Diseminasi / FGD /
Bintek (Kegiatan Sejenis)
1.10.28.02.02.002.002 Pembawa Acara Jasa Pendukung Kegiatan Seminar/ OH 250,000
Rakor/ Sosialisasi/ Diseminasi / FGD /
Bintek (Kegiatan Sejenis)
1.10.28.02.02.002.003 Pembaca Doa Jasa Pendukung Kegiatan Seminar/ OH 200,000
Rakor/ Sosialisasi/ Diseminasi / FGD /
Bintek (Kegiatan Sejenis)
1.10.28.02.02.002.004 Uang Saku Atlet OH 100,000

1.10.28.02.02.002.005 Uang Saku Official OH 200,000

1.10.28.02.02.002.006 Jasa Juri Profesional / Juri Propinsi OH 1,000,000

1.10.28.02.02.002.007 Jasa Juri Internal Pemda OH 350,000

1.10.28.02.02.002.008 Jasa Anggota Satgas Pengamanan Kepolisian / TNI OH 100,000


1.10.28.02.02.002.009 Jasa Pengamanan Linmas (Hansip) OH 75,000

1.10.28.02.02.002.010 Jasa Pelatih Paskibra OH 400,000

1.10.28.02.02.002.011 Jasa Asst. Pelatih Paskibra OH 150,000

1.10.28.02.02.002.012 Jasa Petugas Seleksi Paskibra OH 150,000

1.10.28.02.02.002.013 Jasa Pembina Purna Paskibra OH 100,000

1.10.28.02.02.002.014 Jasa Pengawal / Patwal OH 100,000

1.10.28.02.02.002.015 Jasa Komandan Upacara OH 150,000

1.10.28.02.02.002.016 Jasa Perwira Upacara OH 200,000

1.10.28.02.02.002.017 Jasa Bendel Arsip Petugas Arsip OH 35,000

1.10.28.02.02.002.018 Jasa Angkut Arsip Petugas Arsip OH 35,000

1.10.28.02.02.002.019 Tenaga Paramedis Jasa Petugas Kesehatan OH 50,000

1.10.28.02.02.002.020 Pelayanan Kesehatan Masyarakat Jasa Petugas Kesehatan OH 50,000


Miskin (Jamkesmas) - APBN
1.10.28.02.02.002.021 Pelayanan Kesehatan Masyarakat Jasa Petugas Kesehatan OH 35,000
Miskin (Jamkesmas) - APBD
1.10.28.02.02.002.022 Dokter umum Jasa Petugas Kesehatan OH 150,000

1.10.28.02.02.002.023 Dokter Kejiwaan Jasa Petugas Kesehatan OH 200,000

1.10.28.02.02.002.024 Perawat Umum Jasa Petugas Kesehatan OH 100,000

1.10.28.02.02.002.025 Perawat Jiwa Jasa Petugas Kesehatan OH 125,000

1.10.28.02.02.002.026 Jasa Peliputan Inspeksi Mendadak dan OH 150,000


Jumpa Pers
1.10.28.02.02.002.027 Jasa Pemandu Bahasa Asing OH 250,000

1.10.28.02.02.002.028 Jasa Surveyor OH 50,000

1.10.28.02.02.002.029 Jasa Pembantu Surveyor OH 40,000

334
KODE URAIAN SPESIFIKASI SAT. HARGA SAT.
a b c d e
1.10.28.02.02.002.030 Jasa Verifikasi Nota Pertimbangan OH 50,000
Pangkat
1.10.28.02.02.002.031 Jasa Petugas Kebersihan Kegiatan OH 50,000

1.10.28.02.02.002.033 Jasa Pramusaji OH 50,000

1.10.28.02.02.002.034 Jasa Sopir Angkutan Orang (Rental) OH 150,000


1.10.28.02.02.002.035 Jasa Ast. Narasumber Kegiatan Pelatihan yang menggunakan OH 250,000
Alat Peraga/Bahan Praktek

1.10.28.02.02.002.036 Jasa Petugas korsik OH 250,000

1.10.28.02.02.002.037 Jasa Petugas Koor OH 100,000

1.10.28.02.02.002.038 Jasa Petugas keamanan OH 100,000

1.10.28.02.02.002.039 Jasa Petugas Kesehatan OH 100,000

1.10.28.02.02.002.040 Jasa Petugas Kebersihan OH 50,000

1.10.28.02.02.002.041 Jasa Petugas Pengibar Bendera OH 100,000

1.10.28.02.02.002.042 Jasa Komandan Upacara & Dan Kompi OH 150,000

1.10.28.02.02.002.043 Jasa Pengatur Barisan OH 100,000

1.10.28.02.02.002.044 Jasa Pembaca UUD 1945/Panca Prasetya KORPRI OH 100,000


1.10.28.02.02.002.045 Buruh Tani OH 50,000

1.10.28.02.02.002.046 Tenaga Kerja Potong Jerami OH 80,000

1.10.28.02.02.002.047 Tenaga Kerja Penyemprotan OH 200,000

1.10.28.02.02.002.048 Jasa Tenaga Assesor OH 500,000

1.10.28.02.02.003 Upah/Jasa dengan Satuan (Orang/Jam)

1.10.28.02.02.003.001 Jasa Narasumber Kegiatan Seminar/ Menteri / pejabat setingkat Menteri/ OJ 2,500,000
Rakor/ Sosialisasi/ Diseminasi / FGD / Pejabat Negara Lainnya/yang
Bintek (Kegiatan Sejenis) disetarakan

1.10.28.02.02.003.002 Jasa Narasumber Kegiatan Seminar/ Pejabat Eselon I / yang disetarakan OJ 1,750,000
Rakor/ Sosialisasi/ Diseminasi / FGD /
Bintek (Kegiatan Sejenis)

1.10.28.02.02.003.003 Jasa Narasumber Kegiatan Seminar/ Pejabat Eselon II / yang disetarakan OJ 1,000,000
Rakor/ Sosialisasi/ Diseminasi / FGD /
Bintek (Kegiatan Sejenis)

1.10.28.02.02.003.004 Jasa Narasumber Kegiatan Seminar/ Pejabat Eselon III ke bawah / yang OJ 900,000
Rakor/ Sosialisasi/ Diseminasi / FGD / disetarakan
Bintek (Kegiatan Sejenis)

1.10.28.02.02.003.005 Jasa Narasumber Kegiatan Seminar/ Pakar/Praktisi/Pembicara OJ 1,700,000


Rakor/ Sosialisasi/ Diseminasi / FGD / Khusus/Tenaga Ahli
Bintek (Kegiatan Sejenis)

1.10.28.02.02.003.006 Penyuluh Jasa Pendukung Kegiatan Seminar/ OJ 250,000


Rakor/ Sosialisasi/ Diseminasi / FGD /
Bintek (Kegiatan Sejenis)
1.10.28.02.02.003.007 Jasa Pelatih Seni OJ 150,000

1.10.28.02.02.003.008 Jasa Pelatih Olah Raga OJ 150,000

335
KODE URAIAN SPESIFIKASI SAT. HARGA SAT.
a b c d e
1.10.28.02.02.003.009 Jasa Juri Profesional Kegiatan Batikku Batikmu, Pemilihan OJ 1,250,000
Gus dan Yuk (Duta Wisata), Pemilihan
Gus dan Yuk Cilik

1.10.28.02.02.003.010 Jasa Penyiar Radio OJ 30,000

1.10.28.02.02.004 Upah/Jasa dengan Satuan


(Orang/Kegiatan)
1.10.28.02.02.004.001 Jasa Master of Ceremony (MC) Per Acara 500,000
Profesional
1.10.28.02.02.004.002 Jasa Master of Ceremony (MC) Non Per Acara 250,000
Profesional
1.10.28.02.02.004.003 Jasa Pembaca Al Qur'an Per Acara 150,000

1.10.28.02.02.004.004 Jasa Instruktur Senam OK 250,000

1.10.28.02.02.004.005 Wasit Per Paket Pertandingan Per 300,000


pertandinga
n
1.10.28.02.02.004.006 Wasit Perorangan Per 50,000
pertandinga
n
1.10.28.02.02.004.007 Biaya Make Up & Sanggul Orang 350,000

1.10.28.02.02.004.008 Biaya Make Up & Sanggul Untuk Orang 750,000


Pengantin
1.10.28.02.02.004.009 Rias Pengantin Bentuk Basahan Orang 1,000,000

1.10.28.02.02.004.010 Rias Pengantin Bentuk Solo Orang 1,000,000

1.10.28.02.02.004.011 Rias Pengantin Bentuk Muslim Orang 1,000,000

1.10.28.02.02.004.012 Rias Karakter Pekohan Orang 350,000

1.10.28.02.02.004.013 Rias Cantik Bersanggul Orang 400,000

1.10.28.02.02.004.014 Rias Cantik Tanpa Sanggul Orang 300,000

1.10.28.02.02.004.015 Tenaga Kurir Per Kegiatan 35,000


1.10.28.02.02.004.016 Kepala/Supervisor Regu Penyemprotan Jasa Petugas Kesehatan Orang 100,000
Nyamuk/Lalat Kegiatan
1.10.28.02.02.004.017 Petugas Epidemologi Jasa Petugas Kesehatan Orang 75,000
Kegiatan
1.10.28.02.02.004.018 Petugas Penyemprot Nyamuk/Lalat Jasa Petugas Kesehatan Orang 75,000
Kegiatan
1.10.28.02.02.004.019 Fasilitator Jasa Petugas Kesehatan OK 700,000

1.10.28.02.02.004.020 Dokter Spesialis (Keg. Penyuluhan & PemJasa Petugas Kesehatan OK 2,000,000
1.10.28.02.02.004.021 Jasa Juri Internal Pawai Pembangunan OK 500,000

1.10.28.02.02.004.022 Tenaga Bumbun OK 1,500,000

1.10.28.02.02.004.023 Tenaga Klentek OK 700,000

1.10.28.02.02.004.024 Tenaga Pengolahan Lahan 0,5 Ha OK 1,800,000

1.10.28.02.02.004.025 Biaya Borongan Pengairan OK 1,000,000

1.10.28.02.02.004.026 Tenaga potong bibit tebu dan tanam OK 1,500,000

1.10.28.02.02.005 Upah/Jasa dengan Satuan Lainnya Kategori Umum

1.10.28.02.02.005.001 Jasa Kurir Barang Per Alamat 5,000

336
KODE URAIAN SPESIFIKASI SAT. HARGA SAT.
a b c d e
1.10.28.02.02.005.002 Jasa Pos Luar Kota Luar Propinsi Surat 3,500

1.10.28.02.02.005.003 Jasa Pos Dalam Kota Surat 2,000

1.10.28.02.02.005.004 Jasa Kurir Surat Per Alamat 750

1.10.28.02.02.005.005 Jasa Instalasi, setting dan pointing radio Per Radio 2,500,000

1.10.28.02.02.005.006 Jasa Pemasangan dan Pembongkaran Per Meter 100,000


Tower
1.10.28.02.02.005.007 Jasa Pengecatan Tower Monopole Upah dan Bahan Per Meter 75,000

1.10.28.02.02.005.008 Jasa Pengecetan Tower Triangle beton u Upah dan Bahan Per Meter 125,000
1.10.28.02.02.005.009 Jasa Penggantian Kawat Seling Tower MoUpah dan Bahan Per Meter 175,000
1.10.28.02.02.005.010 Jasa Penggantian Kawat Seling Tower Upah dan Bahan Per Meter 250,000
Triangle
1.10.28.02.02.005.011 Jasa EntryData Per Lembar 1,500

1.10.28.02.02.005.012 Jasa Surveyor Orang Titik 8,000

1.10.28.02.02.005.013 Jasa Dokter Terapis SLB/Berkebutuhan Khusus Orang/Anak 850,000

1.10.28.02.02.005.014 Biaya Jahit Pakaian Potong 100,000

1.10.28.02.02.005.015 Biaya Jahit Pakaian Stell 200,000

1.10.28.02.02.005.016 Jasa Laundry Cuci + Setrika Kg 7,300

1.10.28.02.02.005.017 Jasa Cucian Korden m 7,300

1.10.28.02.02.005.018 Jasa Scan dokumen/arsip lembar 2,500

1.10.28.02.02.005.019 Jasa Fumigasi Pemasangan selang monito; m2 45,000


Pemasangan lembar penutup;
Pemasangan Sand Snake; Pengukuran
Vol.Komoditas; Penentuan jumlah
Fumigan; Pendistribusian Fumigan;
Deteksi Kebocoran Gas; Pembebasan
ruang fumigasi dr fumigan;
Pengemasan Alat dan bahan

1.10.28.02.02.005.020 Ongkos Jahit Staf Orang 100,000

1.10.28.02.02.005.021 Ongkos Jahit Eselon IV Orang 150,000

1.10.28.02.02.005.022 Ongkos Jahit Eselon III Orang 200,000

1.10.28.02.02.005.023 Ongkos Jahit Eselon II Orang 250,000

1.10.28.02.02.005.024 Jasa Karikatur Dimensi wajah/lukisan per edisi 380,000

1.10.28.02.02.005.025 Petugas penempel per edisi 100,000

1.10.28.02.02.005.026 Design / Layout per hal 25,000

1.10.28.02.02.005.027 Jasa MOP/ MOW pasien 2,800,000

1.10.28.02.02.005.028 Tenaga borongan lubang tanam Per Lubang 3,000


Tanam
1.10.28.02.02.005.029 Pemeliharaan dan perbaikan biling paket 3,500,000
system
1.10.28.02.02.005.030 Dokter Spesialis Orang/Kunju 500,000
ngan
1.10.28.02.02.005.031 Psikolog Orang/Kunju 500,000
ngan

337
KODE URAIAN SPESIFIKASI SAT. HARGA SAT.
a b c d e
1.10.28.02.02.005.032 Jasa Layanan Juru Parkir tahun 200,000

1.10.28.02.02.005.033 Jasa Pembuatan Video Duurasi 2-4 menit, 1080 HD, Frame dokumen 5,000,000
Width 1280, Frame Height 720,

1.10.28.02.03 Upah/Jasa Konsultansi


1.10.28.02.03.001 Tenaga Ahli Fisik
1.10.28.02.03.001.001 AHLI MUDA S1 (Pengalaman Kerja) 1 Th OB 18,000,000

1.10.28.02.03.001.002 AHLI MUDA S1 (Pengalaman Kerja) 2 Th OB 19,500,000

1.10.28.02.03.001.003 AHLI MUDA S1 (Pengalaman Kerja) 3 Th OB 21,000,000

1.10.28.02.03.001.004 AHLI MUDA S1 (Pengalaman Kerja) 4 Th OB 22,500,000

1.10.28.02.03.001.005 AHLI MUDA S1 (Pengalaman Kerja) 5 Th OB 24,000,000

1.10.28.02.03.001.006 AHLI MUDA S1 (Pengalaman Kerja) 6 Th OB 25,500,000

1.10.28.02.03.001.007 AHLI MUDA S1 (Pengalaman Kerja) 7 Th OB 27,000,000

1.10.28.02.03.001.008 AHLI MUDA S1 (Pengalaman Kerja) 8 Th OB 28,500,000

1.10.28.02.03.001.009 AHLI MUDA S1 (Pengalaman Kerja) 9 Th OB 30,000,000

1.10.28.02.03.001.010 AHLI MUDA S1 (Pengalaman Kerja) 10 Th OB 31,500,000

1.10.28.02.03.001.011 AHLI MUDA S1 (Pengalaman Kerja) 11 Th OB 33,000,000

1.10.28.02.03.001.012 AHLI MUDA S1 (Pengalaman Kerja) 12 Th OB 34,500,000

1.10.28.02.03.001.013 AHLI MUDA S1 (Pengalaman Kerja) 13 Th OB 36,000,000

1.10.28.02.03.001.014 AHLI MUDA S1 (Pengalaman Kerja) 14 Th OB 37,500,000

1.10.28.02.03.001.015 AHLI MUDA S1 (Pengalaman Kerja) 15 Th OB 39,000,000

1.10.28.02.03.001.016 AHLI MUDA S1 (Pengalaman Kerja) 16 Th OB 40,500,000

1.10.28.02.03.001.017 AHLI MUDA S1 (Pengalaman Kerja) 17 Th OB 42,000,000

1.10.28.02.03.001.018 AHLI MUDA S1 (Pengalaman Kerja) 18 Th OB 43,500,000

1.10.28.02.03.001.019 AHLI MUDA S1 (Pengalaman Kerja) 19 Th OB 45,000,000

1.10.28.02.03.001.020 AHLI MUDA S1 (Pengalaman Kerja) 20 Th OB 46,500,000

1.10.28.02.03.001.021 AHLI MUDA S1 (Pengalaman Kerja) 21 Th OB 48,000,000

1.10.28.02.03.001.022 AHLI MUDA S1 (Pengalaman Kerja) 22 Th OB 49,500,000

1.10.28.02.03.001.023 AHLI MUDA S1 (Pengalaman Kerja) 23 Th OB 51,000,000

1.10.28.02.03.001.024 AHLI MUDA S2 (Pengalaman Kerja) 1 Th OB 26,500,000

1.10.28.02.03.001.025 AHLI MUDA S2 (Pengalaman Kerja) 2 Th OB 28,250,000

1.10.28.02.03.001.026 AHLI MUDA S2 (Pengalaman Kerja) 3 Th OB 30,000,000

1.10.28.02.03.001.027 AHLI MUDA S2 (Pengalaman Kerja) 4 Th OB 31,750,000

1.10.28.02.03.001.028 AHLI MUDA S2 (Pengalaman Kerja) 5 Th OB 33,500,000

338
KODE URAIAN SPESIFIKASI SAT. HARGA SAT.
a b c d e
1.10.28.02.03.001.029 AHLI MUDA S2 (Pengalaman Kerja) 6 Th OB 35,500,000

1.10.28.02.03.001.030 AHLI MUDA S2 (Pengalaman Kerja) 7 Th OB 37,250,000

1.10.28.02.03.001.031 AHLI MUDA S2 (Pengalaman Kerja) 8 Th OB 39,000,000

1.10.28.02.03.001.032 AHLI MUDA S2 (Pengalaman Kerja) 9 Th OB 41,000,000

1.10.28.02.03.001.033 AHLI MUDA S2 (Pengalaman Kerja) 10 Th OB 42,750,000

1.10.28.02.03.001.034 AHLI MUDA S2 (Pengalaman Kerja) 11 Th OB 44,500,000

1.10.28.02.03.001.035 AHLI MUDA S2 (Pengalaman Kerja) 12 Th OB 46,500,000

1.10.28.02.03.001.036 AHLI MUDA S2 (Pengalaman Kerja) 13 Th OB 48,250,000

1.10.28.02.03.001.037 AHLI MUDA S2 (Pengalaman Kerja) 14 Th OB 50,000,000

1.10.28.02.03.001.038 AHLI MUDA S2 (Pengalaman Kerja) 15 Th OB 52,000,000

1.10.28.02.03.001.039 AHLI MUDA S2 (Pengalaman Kerja) 16 Th OB 53,750,000

1.10.28.02.03.001.040 AHLI MUDA S2 (Pengalaman Kerja) 17 Th OB 55,500,000

1.10.28.02.03.001.041 AHLI MUDA S2 (Pengalaman Kerja) 18 Th OB 57,500,000

1.10.28.02.03.001.042 AHLI MUDA S2 (Pengalaman Kerja) 19 Th OB 59,250,000

1.10.28.02.03.001.043 AHLI MUDA S2 (Pengalaman Kerja) 20 Th OB 61,000,000

1.10.28.02.03.001.044 AHLI MUDA S2 (Pengalaman Kerja) 21 Th OB 63,000,000

1.10.28.02.03.001.045 AHLI MUDA S2 (Pengalaman Kerja) 22 Th OB 64,750,000

1.10.28.02.03.001.046 AHLI MUDA S2 (Pengalaman Kerja) 23 Th OB 66,500,000

1.10.28.02.03.001.047 AHLI MUDA S3 (Pengalaman Kerja) 1 Th OB 31,000,000

1.10.28.02.03.001.048 AHLI MUDA S3 (Pengalaman Kerja) 2 Th OB 33,000,000

1.10.28.02.03.001.049 AHLI MUDA S3 (Pengalaman Kerja) 3 Th OB 35,000,000

1.10.28.02.03.001.050 AHLI MUDA S3 (Pengalaman Kerja) 4 Th OB 37,000,000

1.10.28.02.03.001.051 AHLI MUDA S3 (Pengalaman Kerja) 5 Th OB 39,000,000

1.10.28.02.03.001.052 AHLI MUDA S3 (Pengalaman Kerja) 6 Th OB 43,000,000

1.10.28.02.03.001.053 AHLI MUDA S3 (Pengalaman Kerja) 7 Th OB 45,000,000

1.10.28.02.03.001.054 AHLI MUDA S3 (Pengalaman Kerja) 8 Th OB 47,000,000

1.10.28.02.03.001.055 AHLI MUDA S3 (Pengalaman Kerja) 9 Th OB 49,000,000

1.10.28.02.03.001.056 AHLI MUDA S3 (Pengalaman Kerja) 10 Th OB 51,000,000

1.10.28.02.03.001.057 AHLI MUDA S3 (Pengalaman Kerja) 11 Th OB 53,000,000

1.10.28.02.03.001.058 AHLI MUDA S3 (Pengalaman Kerja) 12 Th OB 55,000,000

1.10.28.02.03.001.059 AHLI MUDA S3 (Pengalaman Kerja) 13 Th OB 57,000,000

1.10.28.02.03.001.060 AHLI MUDA S3 (Pengalaman Kerja) 14 Th OB 59,000,000

339
KODE URAIAN SPESIFIKASI SAT. HARGA SAT.
a b c d e
1.10.28.02.03.001.061 AHLI MUDA S3 (Pengalaman Kerja) 15 Th OB 61,000,000

1.10.28.02.03.001.062 AHLI MUDA S3 (Pengalaman Kerja) 16 Th OB 63,000,000

1.10.28.02.03.001.063 AHLI MUDA S3 (Pengalaman Kerja) 17 Th OB 65,000,000

1.10.28.02.03.001.064 AHLI MUDA S3 (Pengalaman Kerja) 18 Th OB 67,000,000

1.10.28.02.03.001.065 AHLI MUDA S3 (Pengalaman Kerja) 19 Th OB 69,000,000

1.10.28.02.03.001.066 AHLI MUDA S3 (Pengalaman Kerja) 20 Th OB 71,000,000

1.10.28.02.03.001.067 AHLI MUDA S3 (Pengalaman Kerja) 21 Th OB 73,000,000

1.10.28.02.03.001.068 AHLI MUDA S3 (Pengalaman Kerja) 22 Th OB 75,000,000

1.10.28.02.03.001.069 AHLI MUDA S3 (Pengalaman Kerja) 23 Th OB 77,000,000

1.10.28.02.03.001.070 AHLI MADYA S1 (Pengalaman Kerja) 1 Th OB 21,000,000

1.10.28.02.03.001.071 AHLI MADYA S1 (Pengalaman Kerja) 2 Th OB 22,500,000

1.10.28.02.03.001.072 AHLI MADYA S1 (Pengalaman Kerja) 3 Th OB 24,000,000

1.10.28.02.03.001.073 AHLI MADYA S1 (Pengalaman Kerja) 4 Th OB 25,500,000

1.10.28.02.03.001.074 AHLI MADYA S1 (Pengalaman Kerja) 5 Th OB 27,000,000

1.10.28.02.03.001.075 AHLI MADYA S1 (Pengalaman Kerja) 6 Th OB 28,500,000

1.10.28.02.03.001.076 AHLI MADYA S1 (Pengalaman Kerja) 7 Th OB 30,000,000

1.10.28.02.03.001.077 AHLI MADYA S1 (Pengalaman Kerja) 8 Th OB 31,500,000

1.10.28.02.03.001.078 AHLI MADYA S1 (Pengalaman Kerja) 9 Th OB 33,000,000

1.10.28.02.03.001.079 AHLI MADYA S1 (Pengalaman Kerja) 10 Th OB 34,500,000

1.10.28.02.03.001.080 AHLI MADYA S1 (Pengalaman Kerja) 11 Th OB 36,000,000

1.10.28.02.03.001.081 AHLI MADYA S1 (Pengalaman Kerja) 12 Th OB 37,500,000

1.10.28.02.03.001.082 AHLI MADYA S1 (Pengalaman Kerja) 13 Th OB 39,000,000

1.10.28.02.03.001.083 AHLI MADYA S1 (Pengalaman Kerja) 14 Th OB 40,500,000

1.10.28.02.03.001.084 AHLI MADYA S1 (Pengalaman Kerja) 15 Th OB 42,000,000

1.10.28.02.03.001.085 AHLI MADYA S1 (Pengalaman Kerja) 16 Th OB 43,500,000

1.10.28.02.03.001.086 AHLI MADYA S1 (Pengalaman Kerja) 17 Th OB 45,000,000

1.10.28.02.03.001.087 AHLI MADYA S1 (Pengalaman Kerja) 18 Th OB 46,500,000

1.10.28.02.03.001.088 AHLI MADYA S1 (Pengalaman Kerja) 19 Th OB 48,000,000

1.10.28.02.03.001.089 AHLI MADYA S1 (Pengalaman Kerja) 20 Th OB 49,500,000

1.10.28.02.03.001.090 AHLI MADYA S1 (Pengalaman Kerja) 21 Th OB 51,000,000

1.10.28.02.03.001.091 AHLI MADYA S2 (Pengalaman Kerja) 1 Th OB 30,000,000

1.10.28.02.03.001.092 AHLI MADYA S2 (Pengalaman Kerja) 2 Th OB 31,750,000

340
KODE URAIAN SPESIFIKASI SAT. HARGA SAT.
a b c d e
1.10.28.02.03.001.093 AHLI MADYA S2 (Pengalaman Kerja) 3 Th OB 33,500,000

1.10.28.02.03.001.094 AHLI MADYA S2 (Pengalaman Kerja) 4 Th OB 35,500,000

1.10.28.02.03.001.095 AHLI MADYA S2 (Pengalaman Kerja) 5 Th OB 37,250,000

1.10.28.02.03.001.096 AHLI MADYA S2 (Pengalaman Kerja) 6 Th OB 39,000,000

1.10.28.02.03.001.097 AHLI MADYA S2 (Pengalaman Kerja) 7 Th OB 41,000,000

1.10.28.02.03.001.098 AHLI MADYA S2 (Pengalaman Kerja) 8 Th OB 42,750,000

1.10.28.02.03.001.099 AHLI MADYA S2 (Pengalaman Kerja) 9 Th OB 44,500,000

1.10.28.02.03.001.100 AHLI MADYA S2 (Pengalaman Kerja) 10 Th OB 46,500,000

1.10.28.02.03.001.101 AHLI MADYA S2 (Pengalaman Kerja) 11 Th OB 48,250,000

1.10.28.02.03.001.102 AHLI MADYA S2 (Pengalaman Kerja) 12 Th OB 50,000,000

1.10.28.02.03.001.103 AHLI MADYA S2 (Pengalaman Kerja) 13 Th OB 52,000,000

1.10.28.02.03.001.104 AHLI MADYA S2 (Pengalaman Kerja) 14 Th OB 53,750,000

1.10.28.02.03.001.105 AHLI MADYA S2 (Pengalaman Kerja) 15 Th OB 55,500,000

1.10.28.02.03.001.106 AHLI MADYA S2 (Pengalaman Kerja) 16 Th OB 57,500,000

1.10.28.02.03.001.107 AHLI MADYA S2 (Pengalaman Kerja) 17 Th OB 59,250,000

1.10.28.02.03.001.108 AHLI MADYA S2 (Pengalaman Kerja) 18 Th OB 61,000,000

1.10.28.02.03.001.109 AHLI MADYA S2 (Pengalaman Kerja) 19 Th OB 63,000,000

1.10.28.02.03.001.110 AHLI MADYA S2 (Pengalaman Kerja) 20 Th OB 64,750,000

1.10.28.02.03.001.111 AHLI MADYA S2 (Pengalaman Kerja) 21 Th OB 66,500,000

1.10.28.02.03.001.112 AHLI MADYA S3 (Pengalaman Kerja) 1 Th OB 35,000,000

1.10.28.02.03.001.113 AHLI MADYA S3 (Pengalaman Kerja) 2 Th OB 37,000,000

1.10.28.02.03.001.114 AHLI MADYA S3 (Pengalaman Kerja) 3 Th OB 39,000,000

1.10.28.02.03.001.115 AHLI MADYA S3 (Pengalaman Kerja) 4 Th OB 43,000,000

1.10.28.02.03.001.116 AHLI MADYA S3 (Pengalaman Kerja) 5 Th OB 45,000,000

1.10.28.02.03.001.117 AHLI MADYA S3 (Pengalaman Kerja) 6 Th OB 47,000,000

1.10.28.02.03.001.118 AHLI MADYA S3 (Pengalaman Kerja) 7 Th OB 49,000,000

1.10.28.02.03.001.119 AHLI MADYA S3 (Pengalaman Kerja) 8 Th OB 51,000,000

1.10.28.02.03.001.120 AHLI MADYA S3 (Pengalaman Kerja) 9 Th OB 53,000,000

1.10.28.02.03.001.121 AHLI MADYA S3 (Pengalaman Kerja) 10 Th OB 55,000,000

1.10.28.02.03.001.122 AHLI MADYA S3 (Pengalaman Kerja) 11 Th OB 57,000,000

1.10.28.02.03.001.123 AHLI MADYA S3 (Pengalaman Kerja) 12 Th OB 59,000,000

1.10.28.02.03.001.124 AHLI MADYA S3 (Pengalaman Kerja) 13 Th OB 61,000,000

341
KODE URAIAN SPESIFIKASI SAT. HARGA SAT.
a b c d e
1.10.28.02.03.001.125 AHLI MADYA S3 (Pengalaman Kerja) 14 Th OB 63,000,000

1.10.28.02.03.001.126 AHLI MADYA S3 (Pengalaman Kerja) 15 Th OB 65,000,000

1.10.28.02.03.001.127 AHLI MADYA S3 (Pengalaman Kerja) 16 Th OB 67,000,000

1.10.28.02.03.001.128 AHLI MADYA S3 (Pengalaman Kerja) 17 Th OB 69,000,000

1.10.28.02.03.001.129 AHLI MADYA S3 (Pengalaman Kerja) 18 Th OB 71,000,000

1.10.28.02.03.001.130 AHLI MADYA S3 (Pengalaman Kerja) 19 Th OB 73,000,000

1.10.28.02.03.001.131 AHLI MADYA S3 (Pengalaman Kerja) 20 Th OB 75,000,000

1.10.28.02.03.001.132 AHLI MADYA S3 (Pengalaman Kerja) 21 Th OB 77,000,000

1.10.28.02.03.001.133 AHLI UTAMA S1 (Pengalaman Kerja) 1 Th OB 25,500,000

1.10.28.02.03.001.134 AHLI UTAMA S1 (Pengalaman Kerja) 2 Th OB 27,000,000

1.10.28.02.03.001.135 AHLI UTAMA S1 (Pengalaman Kerja) 3 Th OB 28,500,000

1.10.28.02.03.001.136 AHLI UTAMA S1 (Pengalaman Kerja) 4 Th OB 30,000,000

1.10.28.02.03.001.137 AHLI UTAMA S1 (Pengalaman Kerja) 5 Th OB 31,500,000

1.10.28.02.03.001.138 AHLI UTAMA S1 (Pengalaman Kerja) 6 Th OB 33,000,000

1.10.28.02.03.001.139 AHLI UTAMA S1 (Pengalaman Kerja) 7 Th OB 34,500,000

1.10.28.02.03.001.140 AHLI UTAMA S1 (Pengalaman Kerja) 8 Th OB 36,000,000

1.10.28.02.03.001.141 AHLI UTAMA S1 (Pengalaman Kerja) 9 Th OB 37,500,000

1.10.28.02.03.001.142 AHLI UTAMA S1 (Pengalaman Kerja) 10 Th OB 39,000,000

1.10.28.02.03.001.143 AHLI UTAMA S1 (Pengalaman Kerja) 11 Th OB 40,500,000

1.10.28.02.03.001.144 AHLI UTAMA S1 (Pengalaman Kerja) 12 Th OB 42,000,000

1.10.28.02.03.001.145 AHLI UTAMA S1 (Pengalaman Kerja) 13 Th OB 43,500,000

1.10.28.02.03.001.146 AHLI UTAMA S1 (Pengalaman Kerja) 14 Th OB 45,000,000

1.10.28.02.03.001.147 AHLI UTAMA S1 (Pengalaman Kerja) 15 Th OB 46,500,000

1.10.28.02.03.001.148 AHLI UTAMA S1 (Pengalaman Kerja) 16 Th OB 48,000,000

1.10.28.02.03.001.149 AHLI UTAMA S1 (Pengalaman Kerja) 17 Th OB 49,500,000

1.10.28.02.03.001.150 AHLI UTAMA S1 (Pengalaman Kerja) 18 Th OB 51,000,000

1.10.28.02.03.001.151 AHLI UTAMA S2 (Pengalaman Kerja) 1 Th OB 35,500,000

1.10.28.02.03.001.152 AHLI UTAMA S2 (Pengalaman Kerja) 2 Th OB 37,250,000

1.10.28.02.03.001.153 AHLI UTAMA S2 (Pengalaman Kerja) 3 Th OB 39,000,000

1.10.28.02.03.001.154 AHLI UTAMA S2 (Pengalaman Kerja) 4 Th OB 41,000,000

1.10.28.02.03.001.155 AHLI UTAMA S2 (Pengalaman Kerja) 5 Th OB 42,750,000

1.10.28.02.03.001.156 AHLI UTAMA S2 (Pengalaman Kerja) 6 Th OB 44,500,000

342
KODE URAIAN SPESIFIKASI SAT. HARGA SAT.
a b c d e
1.10.28.02.03.001.157 AHLI UTAMA S2 (Pengalaman Kerja) 7 Th OB 46,500,000

1.10.28.02.03.001.158 AHLI UTAMA S2 (Pengalaman Kerja) 8 Th OB 48,250,000

1.10.28.02.03.001.159 AHLI UTAMA S2 (Pengalaman Kerja) 9 Th OB 50,000,000

1.10.28.02.03.001.160 AHLI UTAMA S2 (Pengalaman Kerja) 10 Th OB 52,000,000

1.10.28.02.03.001.161 AHLI UTAMA S2 (Pengalaman Kerja) 11 Th OB 53,750,000

1.10.28.02.03.001.162 AHLI UTAMA S2 (Pengalaman Kerja) 12 Th OB 55,500,000

1.10.28.02.03.001.163 AHLI UTAMA S2 (Pengalaman Kerja) 13 Th OB 57,500,000

1.10.28.02.03.001.164 AHLI UTAMA S2 (Pengalaman Kerja) 14 Th OB 59,250,000

1.10.28.02.03.001.165 AHLI UTAMA S2 (Pengalaman Kerja) 15 Th OB 61,000,000

1.10.28.02.03.001.166 AHLI UTAMA S2 (Pengalaman Kerja) 16 Th OB 63,000,000

1.10.28.02.03.001.167 AHLI UTAMA S2 (Pengalaman Kerja) 17 Th OB 64,750,000

1.10.28.02.03.001.168 AHLI UTAMA S2 (Pengalaman Kerja) 18 Th OB 66,500,000

1.10.28.02.03.001.169 AHLI UTAMA S3 (Pengalaman Kerja) 1 Th OB 43,000,000

1.10.28.02.03.001.170 AHLI UTAMA S3 (Pengalaman Kerja) 2 Th OB 45,000,000

1.10.28.02.03.001.171 AHLI UTAMA S3 (Pengalaman Kerja) 3 Th OB 47,000,000

1.10.28.02.03.001.172 AHLI UTAMA S3 (Pengalaman Kerja) 4 Th OB 49,000,000

1.10.28.02.03.001.173 AHLI UTAMA S3 (Pengalaman Kerja) 5 Th OB 51,000,000

1.10.28.02.03.001.174 AHLI UTAMA S3 (Pengalaman Kerja) 6 Th OB 53,000,000

1.10.28.02.03.001.175 AHLI UTAMA S3 (Pengalaman Kerja) 7 Th OB 55,000,000

1.10.28.02.03.001.176 AHLI UTAMA S3 (Pengalaman Kerja) 8 Th OB 57,000,000

1.10.28.02.03.001.177 AHLI UTAMA S3 (Pengalaman Kerja) 9 Th OB 59,000,000

1.10.28.02.03.001.178 AHLI UTAMA S3 (Pengalaman Kerja) 10 Th OB 61,000,000

1.10.28.02.03.001.179 AHLI UTAMA S3 (Pengalaman Kerja) 11 Th OB 63,000,000

1.10.28.02.03.001.180 AHLI UTAMA S3 (Pengalaman Kerja) 12 Th OB 65,000,000

1.10.28.02.03.001.181 AHLI UTAMA S3 (Pengalaman Kerja) 13 Th OB 67,000,000

1.10.28.02.03.001.182 AHLI UTAMA S3 (Pengalaman Kerja) 14 Th OB 69,000,000

1.10.28.02.03.001.183 AHLI UTAMA S3 (Pengalaman Kerja) 15 Th OB 71,000,000

1.10.28.02.03.001.184 AHLI UTAMA S3 (Pengalaman Kerja) 16 Th OB 73,000,000

1.10.28.02.03.001.185 AHLI UTAMA S3 (Pengalaman Kerja) 17 Th OB 75,000,000

1.10.28.02.03.001.186 AHLI UTAMA S3 (Pengalaman Kerja) 18 Th OB 77,000,000

1.10.28.02.03.002 Tenaga Ahli Non Fisik


1.10.28.02.03.002.001 AHLI MUDA S1 (Pengalaman Kerja) 1 Th OB 4,500,000

343
KODE URAIAN SPESIFIKASI SAT. HARGA SAT.
a b c d e
1.10.28.02.03.002.002 AHLI MUDA S1 (Pengalaman Kerja) 2 Th OB 4,875,000

1.10.28.02.03.002.003 AHLI MUDA S1 (Pengalaman Kerja) 3 Th OB 5,250,000

1.10.28.02.03.002.004 AHLI MUDA S1 (Pengalaman Kerja) 4 Th OB 5,625,000

1.10.28.02.03.002.005 AHLI MUDA S1 (Pengalaman Kerja) 5 Th OB 6,000,000

1.10.28.02.03.002.006 AHLI MUDA S1 (Pengalaman Kerja) 6 Th OB 6,375,000

1.10.28.02.03.002.007 AHLI MUDA S1 (Pengalaman Kerja) 7 Th OB 6,750,000

1.10.28.02.03.002.008 AHLI MUDA S1 (Pengalaman Kerja) 8 Th OB 7,125,000

1.10.28.02.03.002.009 AHLI MUDA S1 (Pengalaman Kerja) 9 Th OB 7,500,000

1.10.28.02.03.002.010 AHLI MUDA S1 (Pengalaman Kerja) 10 Th OB 7,875,000

1.10.28.02.03.002.011 AHLI MUDA S1 (Pengalaman Kerja) 11 Th OB 8,250,000

1.10.28.02.03.002.012 AHLI MUDA S1 (Pengalaman Kerja) 12 Th OB 8,625,000

1.10.28.02.03.002.013 AHLI MUDA S1 (Pengalaman Kerja) 13 Th OB 9,000,000

1.10.28.02.03.002.014 AHLI MUDA S1 (Pengalaman Kerja) 14 Th OB 9,375,000

1.10.28.02.03.002.015 AHLI MUDA S1 (Pengalaman Kerja) 15 Th OB 9,750,000

1.10.28.02.03.002.016 AHLI MUDA S1 (Pengalaman Kerja) 16 Th OB 10,125,000

1.10.28.02.03.002.017 AHLI MUDA S1 (Pengalaman Kerja) 17 Th OB 10,500,000

1.10.28.02.03.002.018 AHLI MUDA S1 (Pengalaman Kerja) 18 Th OB 10,875,000

1.10.28.02.03.002.019 AHLI MUDA S1 (Pengalaman Kerja) 19 Th OB 11,250,000

1.10.28.02.03.002.020 AHLI MUDA S1 (Pengalaman Kerja) 20 Th OB 11,625,000

1.10.28.02.03.002.021 AHLI MUDA S1 (Pengalaman Kerja) 21 Th OB 12,000,000

1.10.28.02.03.002.022 AHLI MUDA S1 (Pengalaman Kerja) 22 Th OB 12,375,000

1.10.28.02.03.002.023 AHLI MUDA S1 (Pengalaman Kerja) 23 Th OB 12,750,000

1.10.28.02.03.002.024 AHLI MUDA S2 (Pengalaman Kerja) 1 Th OB 6,625,000

1.10.28.02.03.002.025 AHLI MUDA S2 (Pengalaman Kerja) 2 Th OB 7,062,500

1.10.28.02.03.002.026 AHLI MUDA S2 (Pengalaman Kerja) 3 Th OB 7,500,000

1.10.28.02.03.002.027 AHLI MUDA S2 (Pengalaman Kerja) 4 Th OB 7,937,500

1.10.28.02.03.002.028 AHLI MUDA S2 (Pengalaman Kerja) 5 Th OB 8,375,000

1.10.28.02.03.002.029 AHLI MUDA S2 (Pengalaman Kerja) 6 Th OB 8,875,000

1.10.28.02.03.002.030 AHLI MUDA S2 (Pengalaman Kerja) 7 Th OB 9,312,500

1.10.28.02.03.002.031 AHLI MUDA S2 (Pengalaman Kerja) 8 Th OB 9,750,000

1.10.28.02.03.002.032 AHLI MUDA S2 (Pengalaman Kerja) 9 Th OB 10,250,000

1.10.28.02.03.002.033 AHLI MUDA S2 (Pengalaman Kerja) 10 Th OB 10,687,500

344
KODE URAIAN SPESIFIKASI SAT. HARGA SAT.
a b c d e
1.10.28.02.03.002.034 AHLI MUDA S2 (Pengalaman Kerja) 11 Th OB 11,125,000

1.10.28.02.03.002.035 AHLI MUDA S2 (Pengalaman Kerja) 12 Th OB 11,625,000

1.10.28.02.03.002.036 AHLI MUDA S2 (Pengalaman Kerja) 13 Th OB 12,062,500

1.10.28.02.03.002.037 AHLI MUDA S2 (Pengalaman Kerja) 14 Th OB 12,500,000

1.10.28.02.03.002.038 AHLI MUDA S2 (Pengalaman Kerja) 15 Th OB 13,000,000

1.10.28.02.03.002.039 AHLI MUDA S2 (Pengalaman Kerja) 16 Th OB 13,437,500

1.10.28.02.03.002.040 AHLI MUDA S2 (Pengalaman Kerja) 17 Th OB 13,875,000

1.10.28.02.03.002.041 AHLI MUDA S2 (Pengalaman Kerja) 18 Th OB 14,375,000

1.10.28.02.03.002.042 AHLI MUDA S2 (Pengalaman Kerja) 19 Th OB 14,812,500

1.10.28.02.03.002.043 AHLI MUDA S2 (Pengalaman Kerja) 20 Th OB 15,250,000

1.10.28.02.03.002.044 AHLI MUDA S2 (Pengalaman Kerja) 21 Th OB 15,750,000

1.10.28.02.03.002.045 AHLI MUDA S2 (Pengalaman Kerja) 22 Th OB 16,187,500

1.10.28.02.03.002.046 AHLI MUDA S2 (Pengalaman Kerja) 23 Th OB 16,625,000

1.10.28.02.03.002.047 AHLI MUDA S3 (Pengalaman Kerja) 1 Th OB 7,750,000

1.10.28.02.03.002.048 AHLI MUDA S3 (Pengalaman Kerja) 2 Th OB 8,250,000

1.10.28.02.03.002.049 AHLI MUDA S3 (Pengalaman Kerja) 3 Th OB 8,750,000

1.10.28.02.03.002.050 AHLI MUDA S3 (Pengalaman Kerja) 4 Th OB 9,250,000

1.10.28.02.03.002.051 AHLI MUDA S3 (Pengalaman Kerja) 5 Th OB 9,750,000

1.10.28.02.03.002.052 AHLI MUDA S3 (Pengalaman Kerja) 6 Th OB 10,750,000

1.10.28.02.03.002.053 AHLI MUDA S3 (Pengalaman Kerja) 7 Th OB 11,250,000

1.10.28.02.03.002.054 AHLI MUDA S3 (Pengalaman Kerja) 8 Th OB 11,750,000

1.10.28.02.03.002.055 AHLI MUDA S3 (Pengalaman Kerja) 9 Th OB 12,250,000

1.10.28.02.03.002.056 AHLI MUDA S3 (Pengalaman Kerja) 10 Th OB 12,750,000

1.10.28.02.03.002.057 AHLI MUDA S3 (Pengalaman Kerja) 11 Th OB 13,250,000

1.10.28.02.03.002.058 AHLI MUDA S3 (Pengalaman Kerja) 12 Th OB 13,750,000

1.10.28.02.03.002.059 AHLI MUDA S3 (Pengalaman Kerja) 13 Th OB 14,250,000

1.10.28.02.03.002.060 AHLI MUDA S3 (Pengalaman Kerja) 14 Th OB 14,750,000

1.10.28.02.03.002.061 AHLI MUDA S3 (Pengalaman Kerja) 15 Th OB 15,250,000

1.10.28.02.03.002.062 AHLI MUDA S3 (Pengalaman Kerja) 16 Th OB 15,750,000

1.10.28.02.03.002.063 AHLI MUDA S3 (Pengalaman Kerja) 17 Th OB 16,250,000

1.10.28.02.03.002.064 AHLI MUDA S3 (Pengalaman Kerja) 18 Th OB 16,750,000

1.10.28.02.03.002.065 AHLI MUDA S3 (Pengalaman Kerja) 19 Th OB 17,250,000

345
KODE URAIAN SPESIFIKASI SAT. HARGA SAT.
a b c d e
1.10.28.02.03.002.066 AHLI MUDA S3 (Pengalaman Kerja) 20 Th OB 17,750,000

1.10.28.02.03.002.067 AHLI MUDA S3 (Pengalaman Kerja) 21 Th OB 18,250,000

1.10.28.02.03.002.068 AHLI MUDA S3 (Pengalaman Kerja) 22 Th OB 18,750,000

1.10.28.02.03.002.069 AHLI MUDA S3 (Pengalaman Kerja) 23 Th OB 19,250,000

1.10.28.02.03.002.070 AHLI MADYA S1 (Pengalaman Kerja) 1 Th OB 5,250,000

1.10.28.02.03.002.071 AHLI MADYA S1 (Pengalaman Kerja) 2 Th OB 5,625,000

1.10.28.02.03.002.072 AHLI MADYA S1 (Pengalaman Kerja) 3 Th OB 6,000,000

1.10.28.02.03.002.073 AHLI MADYA S1 (Pengalaman Kerja) 4 Th OB 6,375,000

1.10.28.02.03.002.074 AHLI MADYA S1 (Pengalaman Kerja) 5 Th OB 6,750,000

1.10.28.02.03.002.075 AHLI MADYA S1 (Pengalaman Kerja) 6 Th OB 7,125,000

1.10.28.02.03.002.076 AHLI MADYA S1 (Pengalaman Kerja) 7 Th OB 7,500,000

1.10.28.02.03.002.077 AHLI MADYA S1 (Pengalaman Kerja) 8 Th OB 7,875,000

1.10.28.02.03.002.078 AHLI MADYA S1 (Pengalaman Kerja) 9 Th OB 8,250,000

1.10.28.02.03.002.079 AHLI MADYA S1 (Pengalaman Kerja) 10 Th OB 8,625,000

1.10.28.02.03.002.080 AHLI MADYA S1 (Pengalaman Kerja) 11 Th OB 9,000,000

1.10.28.02.03.002.081 AHLI MADYA S1 (Pengalaman Kerja) 12 Th OB 9,375,000

1.10.28.02.03.002.082 AHLI MADYA S1 (Pengalaman Kerja) 13 Th OB 9,750,000

1.10.28.02.03.002.083 AHLI MADYA S1 (Pengalaman Kerja) 14 Th OB 10,125,000

1.10.28.02.03.002.084 AHLI MADYA S1 (Pengalaman Kerja) 15 Th OB 10,500,000

1.10.28.02.03.002.085 AHLI MADYA S1 (Pengalaman Kerja) 16 Th OB 10,875,000

1.10.28.02.03.002.086 AHLI MADYA S1 (Pengalaman Kerja) 17 Th OB 11,250,000

1.10.28.02.03.002.087 AHLI MADYA S1 (Pengalaman Kerja) 18 Th OB 11,625,000

1.10.28.02.03.002.088 AHLI MADYA S1 (Pengalaman Kerja) 19 Th OB 12,000,000

1.10.28.02.03.002.089 AHLI MADYA S1 (Pengalaman Kerja) 20 Th OB 12,375,000

1.10.28.02.03.002.090 AHLI MADYA S1 (Pengalaman Kerja) 21 Th OB 12,750,000

1.10.28.02.03.002.091 AHLI MADYA S2 (Pengalaman Kerja) 1 Th OB 7,500,000

1.10.28.02.03.002.092 AHLI MADYA S2 (Pengalaman Kerja) 2 Th OB 7,937,500

1.10.28.02.03.002.093 AHLI MADYA S2 (Pengalaman Kerja) 3 Th OB 8,375,000

1.10.28.02.03.002.094 AHLI MADYA S2 (Pengalaman Kerja) 4 Th OB 8,875,000

1.10.28.02.03.002.095 AHLI MADYA S2 (Pengalaman Kerja) 5 Th OB 9,312,500

1.10.28.02.03.002.096 AHLI MADYA S2 (Pengalaman Kerja) 6 Th OB 9,750,000

1.10.28.02.03.002.097 AHLI MADYA S2 (Pengalaman Kerja) 7 Th OB 10,250,000

346
KODE URAIAN SPESIFIKASI SAT. HARGA SAT.
a b c d e
1.10.28.02.03.002.098 AHLI MADYA S2 (Pengalaman Kerja) 8 Th OB 10,687,500

1.10.28.02.03.002.099 AHLI MADYA S2 (Pengalaman Kerja) 9 Th OB 11,125,000

1.10.28.02.03.002.100 AHLI MADYA S2 (Pengalaman Kerja) 10 Th OB 11,625,000

1.10.28.02.03.002.101 AHLI MADYA S2 (Pengalaman Kerja) 11 Th OB 12,062,500

1.10.28.02.03.002.102 AHLI MADYA S2 (Pengalaman Kerja) 12 Th OB 12,500,000

1.10.28.02.03.002.103 AHLI MADYA S2 (Pengalaman Kerja) 13 Th OB 13,000,000

1.10.28.02.03.002.104 AHLI MADYA S2 (Pengalaman Kerja) 14 Th OB 13,437,500

1.10.28.02.03.002.105 AHLI MADYA S2 (Pengalaman Kerja) 15 Th OB 13,875,000

1.10.28.02.03.002.106 AHLI MADYA S2 (Pengalaman Kerja) 16 Th OB 14,375,000

1.10.28.02.03.002.107 AHLI MADYA S2 (Pengalaman Kerja) 17 Th OB 14,812,500

1.10.28.02.03.002.108 AHLI MADYA S2 (Pengalaman Kerja) 18 Th OB 15,250,000

1.10.28.02.03.002.109 AHLI MADYA S2 (Pengalaman Kerja) 19 Th OB 15,750,000

1.10.28.02.03.002.110 AHLI MADYA S2 (Pengalaman Kerja) 20 Th OB 16,187,500

1.10.28.02.03.002.111 AHLI MADYA S2 (Pengalaman Kerja) 21 Th OB 16,625,000

1.10.28.02.03.002.112 AHLI MADYA S3 (Pengalaman Kerja) 1 Th OB 8,750,000

1.10.28.02.03.002.113 AHLI MADYA S3 (Pengalaman Kerja) 2 Th OB 9,250,000

1.10.28.02.03.002.114 AHLI MADYA S3 (Pengalaman Kerja) 3 Th OB 9,750,000

1.10.28.02.03.002.115 AHLI MADYA S3 (Pengalaman Kerja) 4 Th OB 10,750,000

1.10.28.02.03.002.116 AHLI MADYA S3 (Pengalaman Kerja) 5 Th OB 11,250,000

1.10.28.02.03.002.117 AHLI MADYA S3 (Pengalaman Kerja) 6 Th OB 11,750,000

1.10.28.02.03.002.118 AHLI MADYA S3 (Pengalaman Kerja) 7 Th OB 12,250,000

1.10.28.02.03.002.119 AHLI MADYA S3 (Pengalaman Kerja) 8 Th OB 12,750,000

1.10.28.02.03.002.120 AHLI MADYA S3 (Pengalaman Kerja) 9 Th OB 13,250,000

1.10.28.02.03.002.121 AHLI MADYA S3 (Pengalaman Kerja) 10 Th OB 13,750,000

1.10.28.02.03.002.122 AHLI MADYA S3 (Pengalaman Kerja) 11 Th OB 14,250,000

1.10.28.02.03.002.123 AHLI MADYA S3 (Pengalaman Kerja) 12 Th OB 14,750,000

1.10.28.02.03.002.124 AHLI MADYA S3 (Pengalaman Kerja) 13 Th OB 15,250,000

1.10.28.02.03.002.125 AHLI MADYA S3 (Pengalaman Kerja) 14 Th OB 15,750,000

1.10.28.02.03.002.126 AHLI MADYA S3 (Pengalaman Kerja) 15 Th OB 16,250,000

1.10.28.02.03.002.127 AHLI MADYA S3 (Pengalaman Kerja) 16 Th OB 16,750,000

1.10.28.02.03.002.128 AHLI MADYA S3 (Pengalaman Kerja) 17 Th OB 17,250,000

1.10.28.02.03.002.129 AHLI MADYA S3 (Pengalaman Kerja) 18 Th OB 17,750,000

347
KODE URAIAN SPESIFIKASI SAT. HARGA SAT.
a b c d e
1.10.28.02.03.002.130 AHLI MADYA S3 (Pengalaman Kerja) 19 Th OB 18,250,000

1.10.28.02.03.002.131 AHLI MADYA S3 (Pengalaman Kerja) 20 Th OB 18,750,000

1.10.28.02.03.002.132 AHLI MADYA S3 (Pengalaman Kerja) 21 Th OB 19,250,000

1.10.28.02.03.002.133 AHLI UTAMA S1 (Pengalaman Kerja) 1 Th OB 6,375,000

1.10.28.02.03.002.134 AHLI UTAMA S1 (Pengalaman Kerja) 2 Th OB 6,750,000

1.10.28.02.03.002.135 AHLI UTAMA S1 (Pengalaman Kerja) 3 Th OB 7,125,000

1.10.28.02.03.002.136 AHLI UTAMA S1 (Pengalaman Kerja) 4 Th OB 7,500,000

1.10.28.02.03.002.137 AHLI UTAMA S1 (Pengalaman Kerja) 5 Th OB 7,875,000

1.10.28.02.03.002.138 AHLI UTAMA S1 (Pengalaman Kerja) 6 Th OB 8,250,000

1.10.28.02.03.002.139 AHLI UTAMA S1 (Pengalaman Kerja) 7 Th OB 8,625,000

1.10.28.02.03.002.140 AHLI UTAMA S1 (Pengalaman Kerja) 8 Th OB 9,000,000

1.10.28.02.03.002.141 AHLI UTAMA S1 (Pengalaman Kerja) 9 Th OB 9,375,000

1.10.28.02.03.002.142 AHLI UTAMA S1 (Pengalaman Kerja) 10 Th OB 9,750,000

1.10.28.02.03.002.143 AHLI UTAMA S1 (Pengalaman Kerja) 11 Th OB 10,125,000

1.10.28.02.03.002.144 AHLI UTAMA S1 (Pengalaman Kerja) 12 Th OB 10,500,000

1.10.28.02.03.002.145 AHLI UTAMA S1 (Pengalaman Kerja) 13 Th OB 10,875,000

1.10.28.02.03.002.146 AHLI UTAMA S1 (Pengalaman Kerja) 14 Th OB 11,250,000

1.10.28.02.03.002.147 AHLI UTAMA S1 (Pengalaman Kerja) 15 Th OB 11,625,000

1.10.28.02.03.002.148 AHLI UTAMA S1 (Pengalaman Kerja) 16 Th OB 12,000,000

1.10.28.02.03.002.149 AHLI UTAMA S1 (Pengalaman Kerja) 17 Th OB 12,375,000

1.10.28.02.03.002.150 AHLI UTAMA S1 (Pengalaman Kerja) 18 Th OB 12,750,000

1.10.28.02.03.002.151 AHLI UTAMA S2 (Pengalaman Kerja) 1 Th OB 8,875,000

1.10.28.02.03.002.152 AHLI UTAMA S2 (Pengalaman Kerja) 2 Th OB 9,312,500

1.10.28.02.03.002.153 AHLI UTAMA S2 (Pengalaman Kerja) 3 Th OB 9,750,000

1.10.28.02.03.002.154 AHLI UTAMA S2 (Pengalaman Kerja) 4 Th OB 10,250,000

1.10.28.02.03.002.155 AHLI UTAMA S2 (Pengalaman Kerja) 5 Th OB 10,687,500

1.10.28.02.03.002.156 AHLI UTAMA S2 (Pengalaman Kerja) 6 Th OB 11,125,000

1.10.28.02.03.002.157 AHLI UTAMA S2 (Pengalaman Kerja) 7 Th OB 11,625,000

1.10.28.02.03.002.158 AHLI UTAMA S2 (Pengalaman Kerja) 8 Th OB 12,062,500

1.10.28.02.03.002.159 AHLI UTAMA S2 (Pengalaman Kerja) 9 Th OB 12,500,000

1.10.28.02.03.002.160 AHLI UTAMA S2 (Pengalaman Kerja) 10 Th OB 13,000,000

1.10.28.02.03.002.161 AHLI UTAMA S2 (Pengalaman Kerja) 11 Th OB 13,437,500

348
KODE URAIAN SPESIFIKASI SAT. HARGA SAT.
a b c d e
1.10.28.02.03.002.162 AHLI UTAMA S2 (Pengalaman Kerja) 12 Th OB 13,875,000

1.10.28.02.03.002.163 AHLI UTAMA S2 (Pengalaman Kerja) 13 Th OB 14,375,000

1.10.28.02.03.002.164 AHLI UTAMA S2 (Pengalaman Kerja) 14 Th OB 14,812,500

1.10.28.02.03.002.165 AHLI UTAMA S2 (Pengalaman Kerja) 15 Th OB 15,250,000

1.10.28.02.03.002.166 AHLI UTAMA S2 (Pengalaman Kerja) 16 Th OB 15,750,000

1.10.28.02.03.002.167 AHLI UTAMA S2 (Pengalaman Kerja) 17 Th OB 16,187,500

1.10.28.02.03.002.168 AHLI UTAMA S2 (Pengalaman Kerja) 18 Th OB 16,625,000

1.10.28.02.03.002.169 AHLI UTAMA S3 (Pengalaman Kerja) 1 Th OB 10,750,000

1.10.28.02.03.002.170 AHLI UTAMA S3 (Pengalaman Kerja) 2 Th OB 11,250,000

1.10.28.02.03.002.171 AHLI UTAMA S3 (Pengalaman Kerja) 3 Th OB 11,750,000

1.10.28.02.03.002.172 AHLI UTAMA S3 (Pengalaman Kerja) 4 Th OB 12,250,000

1.10.28.02.03.002.173 AHLI UTAMA S3 (Pengalaman Kerja) 5 Th OB 12,750,000

1.10.28.02.03.002.174 AHLI UTAMA S3 (Pengalaman Kerja) 6 Th OB 13,250,000

1.10.28.02.03.002.175 AHLI UTAMA S3 (Pengalaman Kerja) 7 Th OB 13,750,000

1.10.28.02.03.002.176 AHLI UTAMA S3 (Pengalaman Kerja) 8 Th OB 14,250,000

1.10.28.02.03.002.177 AHLI UTAMA S3 (Pengalaman Kerja) 9 Th OB 14,750,000

1.10.28.02.03.002.178 AHLI UTAMA S3 (Pengalaman Kerja) 10 Th OB 15,250,000

1.10.28.02.03.002.179 AHLI UTAMA S3 (Pengalaman Kerja) 11 Th OB 15,750,000

1.10.28.02.03.002.180 AHLI UTAMA S3 (Pengalaman Kerja) 12 Th OB 16,250,000

1.10.28.02.03.002.181 AHLI UTAMA S3 (Pengalaman Kerja) 13 Th OB 16,750,000

1.10.28.02.03.002.182 AHLI UTAMA S3 (Pengalaman Kerja) 14 Th OB 17,250,000

1.10.28.02.03.002.183 AHLI UTAMA S3 (Pengalaman Kerja) 15 Th OB 17,750,000

1.10.28.02.03.002.184 AHLI UTAMA S3 (Pengalaman Kerja) 16 Th OB 18,250,000

1.10.28.02.03.002.185 AHLI UTAMA S3 (Pengalaman Kerja) 17 Th OB 18,750,000

1.10.28.02.03.002.186 AHLI UTAMA S3 (Pengalaman Kerja) 18 Th OB 19,250,000

1.10.28.02.03.007 Tenaga Pendukung Biaya Langsung


Personil (Untuk Supporting Staff)

1.10.28.02.03.007.001 Office Manager OB 8,500,000

1.10.28.02.03.007.002 Site Office Manager/Administrator OB 7,700,000

1.10.28.02.03.007.003 Bilingual Secretary OB 8,400,000

1.10.28.02.03.007.004 Secretary OB 5,200,000

1.10.28.02.03.007.005 Computer Operator / Typist OB 4,600,000

349
KODE URAIAN SPESIFIKASI SAT. HARGA SAT.
a b c d e
1.10.28.02.03.007.006 Drafter (Manual) OB 3,850,000

1.10.28.02.03.007.007 Messenger OH 2,750,000

1.10.28.02.03.007.008 Office Boy OH 2,500,000

1.10.28.02.03.007.009 Driver OH 2,950,000

1.10.28.02.03.007.010 Office Guard / Security Office OH 2,700,000

1.10.28.02.03.008 Tenaga Pendukung Biaya Langsung


Personil (Untuk Tenaga Sub
Profesional)
1.10.28.02.03.008.001 Software Programer / Implementer D3 / SO Pendidikan dan Pengalaman OB 9,800,000
lebih dari 3 Th
1.10.28.02.03.008.002 Software Programer / Implementer S1 Pendidikan dan Pengalaman 0 - 3 Th OB 9,800,000
1.10.28.02.03.008.003 Software Programer / Implementer S2 Pendidikan dan Pengalaman 0 - 1 Th OB 9,800,000
1.10.28.02.03.008.004 Hardware Technician D3 / SO Pendidikan dan Pengalaman OB 8,200,000
lebih dari 3 Th
1.10.28.02.03.008.005 Hardware Technician S1 Pendidikan dan Pengalaman 0 - 3 Th OB 8,200,000
1.10.28.02.03.008.006 Hardware Technician S2 Pendidikan dan Pengalaman 0 - 1 Th OB 8,200,000
1.10.28.02.03.008.007 Jasa Technical Support Network Ijazah Min S1; Sertifikasi MTCNA; OB 3,000,000
Pengalaman lebih dari 2 th
1.10.28.02.03.008.008 Jasa Technical Support Network Ijazah Min SMA/SMK; Sertifikasi OB 2,500,000
MTCNA; Pengalaman 0-2 th
1.10.28.02.03.008.009 Jasa Technical Support Network Ijazah Min SMA/SMK; Sertifikasi OB 3,000,000
MTCNA; Pengalaman lebih dari 2 th

1.10.28.02.03.008.010 Jasa Network Administrator Ijazah Min S1 Komputer; Sertifikasi OB 5,000,000


MTCNA; Pengalaman 2 th
1.10.28.02.03.008.011 Jasa Network Administrator Ijazah Min D3 Komputer; Sertifikasi OB 3,500,000
MTCNA; Pengalaman 0-2 th
1.10.28.02.03.008.012 Jasa Network Administrator Ijazah Min D3 Komputer; Sertifikasi OB 4,500,000
MTCNA; Pengalaman lebih dari 2 th

1.10.28.02.03.008.013 Jasa System Administrator Ijazah Min S1 Komputer; Pengalaman 0 - OB 5,000,000


3 th
1.10.28.02.03.008.014 Jasa System Administrator Ijazah Min S1 Komputer; Pengalaman OB 8,000,000
lebih dari 3 th
1.10.28.02.03.008.015 Analis Sistem Ijazah Min S1 Komputer; Pengalaman 0 - OB 3,500,000
3 th
1.10.28.02.03.008.016 Analis Sistem Ijazah Min S1 Komputer; Pengalaman OB 4,500,000
lebih dari 3 th
1.10.28.02.04 Upah/Jasa Lainnya
1.10.28.02.04.001 Satuan Biaya Penerjemahan Dan Kategori umum
Pengetikan
1.10.28.02.04.001.001 Satuan Biaya Penerjemahan Dan Bahasa Inggris ke Bahasa Indonesia Halaman Jadi 152,000
Pengetikan - (Dari Bahasa Asing Ke
Indonesia)
1.10.28.02.04.001.002 Satuan Biaya Penerjemahan Dan Dari Bahasa Jepang Halaman Jadi 238,000
Pengetikan - (Dari Bahasa Asing Ke
Indonesia)
1.10.28.02.04.001.003 Satuan Biaya Penerjemahan Dan Dari Bahasa Mandarin, Belanda Halaman Jadi 238,000
Pengetikan - (Dari Bahasa Asing Ke
Indonesia)
1.10.28.02.04.001.004 Satuan Biaya Penerjemahan Dan Dari Bahasa Prancis, Jerman Halaman Jadi 173,000
Pengetikan - (Dari Bahasa Asing Ke
Indonesia)
1.10.28.02.04.001.005 Satuan Biaya Penerjemahan Dan Dari Bahasa Asing Lainnya Halaman Jadi 173,000
Pengetikan - (Dari Bahasa Asing Ke
Indonesia)
1.10.28.02.04.001.006 Satuan Biaya Penerjemahan Dan Dari Bahasa Indonesia Halaman Jadi 152,000
Pengetikan - (Dari Bahasa Indonesia Ke
Asing)

350
KODE URAIAN SPESIFIKASI SAT. HARGA SAT.
a b c d e
1.10.28.02.04.001.007 Satuan Biaya Penerjemahan Dan Ke Bahasa Jepang Halaman Jadi 238,000
Pengetikan - (Dari Bahasa Indonesia Ke
Asing)
1.10.28.02.04.001.008 Satuan Biaya Penerjemahan Dan Ke Bahasa Mandarin, Belanda Halaman Jadi 238,000
Pengetikan - (Dari Bahasa Indonesia Ke
Asing)
1.10.28.02.04.001.009 Satuan Biaya Penerjemahan Dan Ke Bahasa Prancis, Jerman Halaman Jadi 173,000
Pengetikan - (Dari Bahasa Indonesia Ke
Asing)
1.10.28.02.04.001.010 Satuan Biaya Penerjemahan Dan Ke Bahasa Asing Lainnya Halaman Jadi 173,000
Pengetikan - (Dari Bahasa Indonesia Ke
Asing)
1.10.28.02.04.001.011 Satuan Biaya Penerjemahan Dan Halaman Jadi 120,000
Pengetikan - (Dari Bahasa Indonesia Ke
Bahasa Daerah/Lokal dan sebaliknya)

1.10.28.02.04.002 Satuan Biaya Diklat


1.10.28.02.04.002.001 Diklat Teknis Biaya Fasilitasi per orang 10,000,000

1.10.28.02.04.002.002 Diklat Fungsional Biaya Fasilitasi per orang 10,000,000

1.10.28.02.04.002.003 Diklatpim II Biaya Fasilitasi per orang 35,000,000

1.10.28.02.04.002.004 Diklatpim III Biaya Fasilitasi per orang 25,000,000

1.10.28.02.04.002.005 Diklatpim IV Biaya Fasilitasi per orang 20,000,000

1.10.28.02.04.002.006 Diklat Prajabatan Gol III Biaya Fasilitasi per orang 10,000,000

1.10.28.02.04.002.007 Diklat Prajabatan Gol II Biaya Fasilitasi per orang 8,000,000

1.10.28.02.04.002.008 Diklat / Diklat Honorer Biaya Fasilitasi per orang 5,000,000

1.10.28.02.04.002.009 Assesment bagi Staf Biaya Uji Kompetensi per orang 2,500,000

1.10.28.02.04.002.010 Assesment bagi Eselon IV Biaya Uji Kompetensi per orang 3,000,000

1.10.28.02.04.002.011 Assesment bagi Eselon III Biaya Uji Kompetensi per orang 3,500,000

1.10.28.02.04.002.012 Assesment bagi Eselon II Biaya Uji Kompetensi per orang 4,000,000

1.10.28.02.04.002.013 Assesment Job Target (seleksi Terbuka) Biaya Uji Kompetensi per orang 10,000,000

1.10.28.02.04.099 Upah/Jasa Lain - lain


1.10.28.02.04.099.001 Tambal Ban Buah 25,000

1.10.28.02.04.099.002 Campursari Pemain keyboard, pemain gendang Paket 8,500,000


Jawa, pemain ketipung dangdut,
penyanyi, MC, sound system
1.10.28.03 Satuan Biaya Operasional Kegiatan

1.10.28.03.01 Satuan Biaya Operasional Kegiatan


Umum
1.10.28.03.01.001 Satuan Biaya Uang Lembur Dan Uang
Makan Lembur PNS
1.10.28.03.01.001.001 Uang Lembur Golongan I OJ 13,000

1.10.28.03.01.001.002 Uang Lembur Golongan II OJ 17,000

1.10.28.03.01.001.003 Uang Lembur Golongan III OJ 20,000

1.10.28.03.01.001.004 Uang Lembur Golongan IV OJ 25,000

351
KODE URAIAN SPESIFIKASI SAT. HARGA SAT.
a b c d e
1.10.28.03.01.001.005 Uang Makan Lembur Golongan I dan II OH 30,000

1.10.28.03.01.001.006 Uang Makan Lembur Golongan III OH 32,000

1.10.28.03.01.001.007 Uang Makan Lembur Golongan IV OH 36,000

1.10.28.03.01.002 Satuan Biaya Perjalanan Dinas - Uang


Representasi
1.10.28.03.01.002.001 Uang Representasi Walikota/Wakil Walikota OH 250,000

1.10.28.03.01.002.002 Uang Representasi Sekretaris Daerah (Eselon II OH 250,000


A)/Pimpinan DPRD
1.10.28.03.01.002.003 Uang Representasi Anggota DPRD OH 250,000

1.10.28.03.01.002.004 Uang Representasi Eselon II B OH 150,000

1.10.28.03.01.003 Satuan Biaya Perjalanan Dinas - Uang


Saku Study Banding
1.10.28.03.01.003.001 Uang Saku Study Banding/Kegiatan Walikota OH 450,000
yang Fasilitas Penginapan dan
Konsumsi nya disediakan oleh
Penyelenggara Luar Kota Dalam Prov.

1.10.28.03.01.003.002 Uang Saku Study Banding/Kegiatan Wakil Walikota OH 400,000


yang Fasilitas Penginapan dan
Konsumsi nya disediakan oleh
Penyelenggara Luar Kota Dalam Prov.

1.10.28.03.01.003.003 Uang Saku Study Banding/Kegiatan Sekretaris Daerah/ Eselon II/A OH 350,000
yang Fasilitas Penginapan dan
Konsumsi nya disediakan oleh
Penyelenggara Luar Kota Dalam Prov.

1.10.28.03.01.003.004 Uang Saku Study Banding/Kegiatan Eselon II/ B OH 275,000


yang Fasilitas Penginapan dan
Konsumsi nya disediakan oleh
Penyelenggara Luar Kota Dalam Prov.

1.10.28.03.01.003.005 Uang Saku Study Banding/Kegiatan Eselon III OH 250,000


yang Fasilitas Penginapan dan
Konsumsi nya disediakan oleh
Penyelenggara Luar Kota Dalam Prov.

1.10.28.03.01.003.006 Uang Saku Study Banding/Kegiatan Eselon IV OH 200,000


yang Fasilitas Penginapan dan
Konsumsi nya disediakan oleh
Penyelenggara Luar Kota Dalam Prov.

1.10.28.03.01.003.007 Uang Saku Study Banding/Kegiatan Golongan III dan IV OH 150,000


yang Fasilitas Penginapan dan
Konsumsi nya disediakan oleh
Penyelenggara Luar Kota Dalam Prov.

1.10.28.03.01.003.008 Uang Saku Study Banding/Kegiatan Golongan II dan I OH 125,000


yang Fasilitas Penginapan dan
Konsumsi nya disediakan oleh
Penyelenggara Luar Kota Dalam Prov.

1.10.28.03.01.003.009 Uang Saku Study Banding/Kegiatan Personil Honorer/Non PNS/Masyarakat OH 100,000


yang Fasilitas Penginapan dan
Konsumsi nya disediakan oleh
Penyelenggara Luar Kota Dalam Prov.

352
KODE URAIAN SPESIFIKASI SAT. HARGA SAT.
a b c d e
1.10.28.03.01.003.010 Uang Saku Study Banding/Kegiatan Ketua DPRD OH 350,000
yang Fasilitas Penginapan dan
Konsumsi nya disediakan oleh
Penyelenggara Luar Kota Dalam Prov.

1.10.28.03.01.003.011 Uang Saku Study Banding/Kegiatan Wakil Ketua DPRD OH 325,000


yang Fasilitas Penginapan dan
Konsumsi nya disediakan oleh
Penyelenggara Luar Kota Dalam Prov.

1.10.28.03.01.003.012 Uang Saku Study Banding/Kegiatan Anggota DPRD OH 300,000


yang Fasilitas Penginapan dan
Konsumsi nya disediakan oleh
Penyelenggara Luar Kota Dalam Prov.

1.10.28.03.01.003.013 Uang Saku Study Banding/Kegiatan Walikota OH 1,200,000


yang Fasilitas Penginapan dan
Konsumsi nya disediakan oleh
Penyelenggara Luar Jatim Di Jawa
1.10.28.03.01.003.014 Uang Saku Study Banding/Kegiatan Wakil Walikota OH 1,100,000
yang Fasilitas Penginapan dan
Konsumsi nya disediakan oleh
Penyelenggara Luar Jatim Di Jawa
1.10.28.03.01.003.015 Uang Saku Study Banding/Kegiatan Sekretaris Daerah/ Eselon II/A OH 1,000,000
yang Fasilitas Penginapan dan
Konsumsi nya disediakan oleh
Penyelenggara Luar Jatim Di Jawa
1.10.28.03.01.003.016 Uang Saku Study Banding/Kegiatan Eselon II/ B OH 700,000
yang Fasilitas Penginapan dan
Konsumsi nya disediakan oleh
Penyelenggara Luar Jatim Di Jawa
1.10.28.03.01.003.017 Uang Saku Study Banding/Kegiatan Eselon III OH 600,000
yang Fasilitas Penginapan dan
Konsumsi nya disediakan oleh
Penyelenggara Luar Jatim Di Jawa
1.10.28.03.01.003.018 Uang Saku Study Banding/Kegiatan Eselon IV OH 500,000
yang Fasilitas Penginapan dan
Konsumsi nya disediakan oleh
Penyelenggara Luar Jatim Di Jawa
1.10.28.03.01.003.019 Uang Saku Study Banding/Kegiatan Golongan III dan IV OH 350,000
yang Fasilitas Penginapan dan
Konsumsi nya disediakan oleh
Penyelenggara Luar Jatim Di Jawa
1.10.28.03.01.003.020 Uang Saku Study Banding/Kegiatan Golongan II dan I OH 350,000
yang Fasilitas Penginapan dan
Konsumsi nya disediakan oleh
Penyelenggara Luar Jatim Di Jawa
1.10.28.03.01.003.021 Uang Saku Study Banding/Kegiatan Personil Honorer/Non PNS/Masyarakat OH 350,000
yang Fasilitas Penginapan dan
Konsumsi nya disediakan oleh
Penyelenggara Luar Jatim Di Jawa
1.10.28.03.01.003.022 Uang Saku Study Banding/Kegiatan Ketua DPRD OH 1,000,000
yang Fasilitas Penginapan dan
Konsumsi nya disediakan oleh
Penyelenggara Luar Jatim Di Jawa
1.10.28.03.01.003.023 Uang Saku Study Banding/Kegiatan Wakil Ketua DPRD OH 900,000
yang Fasilitas Penginapan dan
Konsumsi nya disediakan oleh
Penyelenggara Luar Jatim Di Jawa
1.10.28.03.01.003.024 Uang Saku Study Banding/Kegiatan Anggota DPRD OH 800,000
yang Fasilitas Penginapan dan
Konsumsi nya disediakan oleh
Penyelenggara Luar Jatim Di Jawa

353
KODE URAIAN SPESIFIKASI SAT. HARGA SAT.
a b c d e
1.10.28.03.01.003.025 Uang Saku Study Banding/Kegiatan Walikota OH 1,450,000
yang Fasilitas Penginapan dan
Konsumsi nya disediakan oleh
Penyelenggara Ibu Kota / Luar Jawa

1.10.28.03.01.003.026 Uang Saku Study Banding/Kegiatan Wakil Walikota OH 1,400,000


yang Fasilitas Penginapan dan
Konsumsi nya disediakan oleh
Penyelenggara Ibu Kota / Luar Jawa

1.10.28.03.01.003.027 Uang Saku Study Banding/Kegiatan Sekretaris Daerah/ Eselon II/A OH 1,350,000
yang Fasilitas Penginapan dan
Konsumsi nya disediakan oleh
Penyelenggara Ibu Kota / Luar Jawa

1.10.28.03.01.003.028 Uang Saku Study Banding/Kegiatan Eselon II/ B OH 1,000,000


yang Fasilitas Penginapan dan
Konsumsi nya disediakan oleh
Penyelenggara Ibu Kota / Luar Jawa

1.10.28.03.01.003.029 Uang Saku Study Banding/Kegiatan Eselon III OH 850,000


yang Fasilitas Penginapan dan
Konsumsi nya disediakan oleh
Penyelenggara Ibu Kota / Luar Jawa

1.10.28.03.01.003.030 Uang Saku Study Banding/Kegiatan Eselon IV OH 600,000


yang Fasilitas Penginapan dan
Konsumsi nya disediakan oleh
Penyelenggara Ibu Kota / Luar Jawa

1.10.28.03.01.003.031 Uang Saku Study Banding/Kegiatan Golongan III dan IV OH 500,000


yang Fasilitas Penginapan dan
Konsumsi nya disediakan oleh
Penyelenggara Ibu Kota / Luar Jawa

1.10.28.03.01.003.032 Uang Saku Study Banding/Kegiatan Golongan II dan I OH 400,000


yang Fasilitas Penginapan dan
Konsumsi nya disediakan oleh
Penyelenggara Ibu Kota / Luar Jawa

1.10.28.03.01.003.033 Uang Saku Study Banding/Kegiatan Personil Honorer/Non PNS/Masyarakat OH 400,000


yang Fasilitas Penginapan dan
Konsumsi nya disediakan oleh
Penyelenggara Ibu Kota / Luar Jawa

1.10.28.03.01.003.034 Uang Saku Study Banding/Kegiatan Ketua DPRD OH 1,350,000


yang Fasilitas Penginapan dan
Konsumsi nya disediakan oleh
Penyelenggara Ibu Kota / Luar Jawa

1.10.28.03.01.003.035 Uang Saku Study Banding/Kegiatan Wakil Ketua DPRD OH 1,250,000


yang Fasilitas Penginapan dan
Konsumsi nya disediakan oleh
Penyelenggara Ibu Kota / Luar Jawa

1.10.28.03.01.003.036 Uang Saku Study Banding/Kegiatan Anggota DPRD OH 1,150,000


yang Fasilitas Penginapan dan
Konsumsi nya disediakan oleh
Penyelenggara Ibu Kota / Luar Jawa

1.10.28.03.01.004 Satuan Biaya Perjalanan Dinas - Uang


Saku Diklat
1.10.28.03.01.004.001 Uang Saku Diklat Luar Daerah - Luar Walikota OH 300,000
Kota Dalam Prov.

354
KODE URAIAN SPESIFIKASI SAT. HARGA SAT.
a b c d e
1.10.28.03.01.004.002 Uang Saku Diklat Luar Daerah - Luar Wakil Walikota OH 275,000
Kota Dalam Prov.
1.10.28.03.01.004.003 Uang Saku Diklat Luar Daerah - Luar Sekretaris Daerah/ Eselon II/A OH 250,000
Kota Dalam Prov.
1.10.28.03.01.004.004 Uang Saku Diklat Luar Daerah - Luar Eselon II/ B OH 175,000
Kota Dalam Prov.
1.10.28.03.01.004.005 Uang Saku Diklat Luar Daerah - Luar Eselon III OH 150,000
Kota Dalam Prov.
1.10.28.03.01.004.006 Uang Saku Diklat Luar Daerah - Luar Eselon IV OH 125,000
Kota Dalam Prov.
1.10.28.03.01.004.007 Uang Saku Diklat Luar Daerah - Luar Golongan III dan IV OH 100,000
Kota Dalam Prov.
1.10.28.03.01.004.008 Uang Saku Diklat Luar Daerah - Luar Golongan II dan I OH 75,000
Kota Dalam Prov.
1.10.28.03.01.004.009 Uang Saku Diklat Luar Daerah - Luar Personil Honorer/Non PNS/Masyarakat OH 75,000
Kota Dalam Prov.
1.10.28.03.01.004.010 Uang Saku Diklat Luar Daerah - Luar Ketua DPRD OH 250,000
Kota Dalam Prov.
1.10.28.03.01.004.011 Uang Saku Diklat Luar Daerah - Luar Wakil Ketua DPRD OH 225,000
Kota Dalam Prov.
1.10.28.03.01.004.012 Uang Saku Diklat Luar Daerah - Luar Anggota DPRD OH 200,000
Kota Dalam Prov.
1.10.28.03.01.004.013 Uang Saku Diklat Luar Daerah - Luar JatimWalikota OH 600,000
1.10.28.03.01.004.014 Uang Saku Diklat Luar Daerah - Luar JatimWakil Walikota OH 550,000
1.10.28.03.01.004.015 Uang Saku Diklat Luar Daerah - Luar JatimSekretaris Daerah/ Eselon II/A OH 500,000
1.10.28.03.01.004.016 Uang Saku Diklat Luar Daerah - Luar JatimEselon II/ B OH 350,000
1.10.28.03.01.004.017 Uang Saku Diklat Luar Daerah - Luar JatimEselon III OH 300,000
1.10.28.03.01.004.018 Uang Saku Diklat Luar Daerah - Luar JatimEselon IV OH 200,000
1.10.28.03.01.004.019 Uang Saku Diklat Luar Daerah - Luar JatimGolongan III dan IV OH 150,000
1.10.28.03.01.004.020 Uang Saku Diklat Luar Daerah - Luar JatimGolongan II dan I OH 140,000
1.10.28.03.01.004.021 Uang Saku Diklat Luar Daerah - Luar JatimPersonil Honorer/Non PNS OH 100,000
1.10.28.03.01.004.022 Uang Saku Diklat Luar Daerah - Luar JatimKetua DPRD OH 500,000
1.10.28.03.01.004.023 Uang Saku Diklat Luar Daerah - Luar JatimWakil Ketua DPRD OH 450,000
1.10.28.03.01.004.024 Uang Saku Diklat Luar Daerah - Luar JatimAnggota DPRD OH 400,000
1.10.28.03.01.004.025 Uang Saku Diklat Luar Daerah - Ibu Kota Walikota OH 750,000
/ Luar Jawa
1.10.28.03.01.004.026 Uang Saku Diklat Luar Daerah - Ibu Kota Wakil Walikota OH 700,000
/ Luar Jawa
1.10.28.03.01.004.027 Uang Saku Diklat Luar Daerah - Ibu Kota Sekretaris Daerah/ Eselon II/A OH 650,000
/ Luar Jawa
1.10.28.03.01.004.028 Uang Saku Diklat Luar Daerah - Ibu Kota Eselon II/ B OH 500,000
/ Luar Jawa
1.10.28.03.01.004.029 Uang Saku Diklat Luar Daerah - Ibu Kota Eselon III OH 400,000
/ Luar Jawa
1.10.28.03.01.004.030 Uang Saku Diklat Luar Daerah - Ibu Kota Eselon IV OH 250,000
/ Luar Jawa
1.10.28.03.01.004.031 Uang Saku Diklat Luar Daerah - Ibu Kota Golongan III dan IV OH 200,000
/ Luar Jawa
1.10.28.03.01.004.032 Uang Saku Diklat Luar Daerah - Ibu Kota Golongan II dan I OH 175,000
/ Luar Jawa
1.10.28.03.01.004.033 Uang Saku Diklat Luar Daerah - Ibu Kota Personil Honorer/Non PNS/Masyarakat OH 150,000
/ Luar Jawa
1.10.28.03.01.004.034 Uang Saku Diklat Luar Daerah - Ibu Kota Ketua DPRD OH 650,000
/ Luar Jawa
1.10.28.03.01.004.035 Uang Saku Diklat Luar Daerah - Ibu Kota Wakil Ketua DPRD OH 600,000
/ Luar Jawa
1.10.28.03.01.004.036 Uang Saku Diklat Luar Daerah - Ibu Kota Anggota DPRD OH 550,000
/ Luar Jawa
1.10.28.03.01.004.037 Uang Saku Diklat Dalam Daerah Walikota OH 225,000

1.10.28.03.01.004.038 Uang Saku Diklat Dalam Daerah Wakil Walikota OH 200,000

1.10.28.03.01.004.039 Uang Saku Diklat Dalam Daerah Sekretaris Daerah/ Eselon II/A OH 175,000

355
KODE URAIAN SPESIFIKASI SAT. HARGA SAT.
a b c d e
1.10.28.03.01.004.040 Uang Saku Diklat Dalam Daerah Eselon II/ B OH 120,000

1.10.28.03.01.004.041 Uang Saku Diklat Dalam Daerah Eselon III OH 100,000

1.10.28.03.01.004.042 Uang Saku Diklat Dalam Daerah Eselon IV OH 80,000

1.10.28.03.01.004.043 Uang Saku Diklat Dalam Daerah Golongan III dan IV OH 60,000

1.10.28.03.01.004.044 Uang Saku Diklat Dalam Daerah Golongan II dan I OH 50,000

1.10.28.03.01.004.045 Uang Saku Diklat Dalam Daerah Personil Honorer/Non PNS/Masyarakat OH 50,000
1.10.28.03.01.004.046 Uang Saku Diklat Dalam Daerah Ketua DPRD OH 175,000

1.10.28.03.01.004.047 Uang Saku Diklat Dalam Daerah Wakil Ketua DPRD OH 150,000

1.10.28.03.01.004.048 Uang Saku Diklat Dalam Daerah Anggota DPRD OH 125,000

1.10.28.03.01.006 Satuan Biaya Perjalanan Dinas - Biaya


Transportasi
1.10.28.03.01.006.006 Biaya Transportasi Di Dalam Kota Peserta Pelatihan/ Sosialisasi/ Bintek Orang 75,000
Mojokerto dan Sejenis nya/Masyarakat
1.10.28.03.01.006.007 Biaya Transportasi Di Dalam Kota Anggota DPRD yang tidak Orang 100,000
Mojokerto menggunakan kendaraan dinas roda
empat
1.10.28.03.01.006.008 Biaya Transportasi Luar Kota Mojokerto Eselon III ( bukan Ka. SKPD) Orang 242,400
Di Jawa Timur ZONA A
1.10.28.03.01.006.009 Biaya Transportasi Luar Kota Mojokerto Eselon IV Orang 242,400
Di Jawa Timur ZONA A
1.10.28.03.01.006.010 Biaya Transportasi Luar Kota Mojokerto Golongan III dan IV Orang 242,400
Di Jawa Timur ZONA A
1.10.28.03.01.006.011 Biaya Transportasi Luar Kota Mojokerto Golongan II dan I Orang 242,400
Di Jawa Timur ZONA A
1.10.28.03.01.006.012 Biaya Transportasi Luar Kota Mojokerto Personil Honorer dan peserta Orang 242,400
Di Jawa Timur ZONA A Pelatihan/ Sosialisasi/ Bintek /
Masyarakat
1.10.28.03.01.006.013 Biaya Transportasi Luar Kota Mojokerto Anggota DPRD yang tidak Orang 242,400
Di Jawa Timur ZONA A menggunakan kendaraan dinas roda
empat
1.10.28.03.01.006.014 Biaya Transportasi Luar Kota Mojokerto Eselon III ( bukan Ka. SKPD) Orang 405,800
Di Jawa Timur ZONA B
1.10.28.03.01.006.015 Biaya Transportasi Luar Kota Mojokerto Eselon IV Orang 405,800
Di Jawa Timur ZONA B
1.10.28.03.01.006.016 Biaya Transportasi Luar Kota Mojokerto Golongan III dan IV Orang 405,800
Di Jawa Timur ZONA B
1.10.28.03.01.006.017 Biaya Transportasi Luar Kota Mojokerto Golongan II dan I Orang 405,800
Di Jawa Timur ZONA B
1.10.28.03.01.006.018 Biaya Transportasi Luar Kota Mojokerto Personil Honorer dan peserta Orang 405,800
Di Jawa Timur ZONA B Pelatihan/ Sosialisasi/ Bintek /
Masyarakat
1.10.28.03.01.006.019 Biaya Transportasi Luar Kota Mojokerto Anggota DPRD yang tidak Orang 405,800
Di Jawa Timur ZONA B menggunakan kendaraan dinas roda
empat
1.10.28.03.01.006.020 Biaya Transportasi Luar Kota Mojokerto Eselon III ( bukan Ka. SKPD) Orang 405,400
Di Jawa Timur ZONA C
1.10.28.03.01.006.021 Biaya Transportasi Luar Kota Mojokerto Eselon IV Orang 405,400
Di Jawa Timur ZONA C
1.10.28.03.01.006.022 Biaya Transportasi Luar Kota Mojokerto Golongan III dan IV Orang 405,400
Di Jawa Timur ZONA C
1.10.28.03.01.006.023 Biaya Transportasi Luar Kota Mojokerto Golongan II dan I Orang 405,400
Di Jawa Timur ZONA C
1.10.28.03.01.006.024 Biaya Transportasi Luar Kota Mojokerto Personil Honorer dan peserta Orang 405,400
Di Jawa Timur ZONA C Pelatihan/ Sosialisasi/ Bintek /
Masyarakat

356
KODE URAIAN SPESIFIKASI SAT. HARGA SAT.
a b c d e
1.10.28.03.01.006.025 Biaya Transportasi Luar Kota Mojokerto Anggota DPRD yang tidak Orang 405,400
Di Jawa Timur ZONA C menggunakan kendaraan dinas roda
empat
1.10.28.03.01.006.026 Biaya Transportasi Luar Kota Mojokerto Eselon III ( bukan Ka. SKPD) Orang 408,500
Di Jawa Timur ZONA D
1.10.28.03.01.006.027 Biaya Transportasi Luar Kota Mojokerto Eselon IV Orang 408,500
Di Jawa Timur ZONA D
1.10.28.03.01.006.028 Biaya Transportasi Luar Kota Mojokerto Golongan III dan IV Orang 408,500
Di Jawa Timur ZONA D
1.10.28.03.01.006.029 Biaya Transportasi Luar Kota Mojokerto Golongan II dan I Orang 408,500
Di Jawa Timur ZONA D
1.10.28.03.01.006.030 Biaya Transportasi Luar Kota Mojokerto Personil Honorer dan peserta Orang 408,500
Di Jawa Timur ZONA D Pelatihan/ Sosialisasi/ Bintek /
Masyarakat
1.10.28.03.01.006.031 Biaya Transportasi Luar Kota Mojokerto Anggota DPRD yang tidak Orang 408,500
Di Jawa Timur ZONA D menggunakan kendaraan dinas roda
empat
1.10.28.03.01.007 Satuan Biaya Perjalanan Dinas - Biaya
Penginapan (Satuan Biaya Penginapan
Merupakan Alokasi Biaya Tertinggi
Penginapan (At Cost))

1.10.28.03.01.007.001 Biaya Penginapan Luar Kota Di Dalam Eselon I/Kepala Daerah/Ketua DPRD Orang 4,400,000
Propinsi Jawa Timur
1.10.28.03.01.007.002 Biaya Penginapan Luar Kota Di Dalam Eselon II/Anggota DPRD Orang 1,605,000
Propinsi Jawa Timur
1.10.28.03.01.007.003 Biaya Penginapan Luar Kota Di Dalam Eselon III/Gol IV Orang 1,076,000
Propinsi Jawa Timur
1.10.28.03.01.007.004 Biaya Penginapan Luar Kota Di Dalam Eselon IV/Gol III Orang 664,000
Propinsi Jawa Timur
1.10.28.03.01.007.005 Biaya Penginapan Luar Kota Di Dalam Gol II/I Orang 664,000
Propinsi Jawa Timur
1.10.28.03.01.007.006 Biaya Penginapan Di Luar Jawa Timur Di Eselon I/Kepala Daerah/Ketua DPRD Orang 5,725,000
Pulau Jawa
1.10.28.03.01.007.007 Biaya Penginapan Di Luar Jawa Timur Di Eselon II/Anggota DPRD Orang 2,373,000
Pulau Jawa
1.10.28.03.01.007.008 Biaya Penginapan Di Luar Jawa Timur Di Eselon III/Gol IV Orang 1,000,000
Pulau Jawa
1.10.28.03.01.007.009 Biaya Penginapan Di Luar Jawa Timur Di Eselon IV/Gol III Orang 718,000
Pulau Jawa
1.10.28.03.01.007.010 Biaya Penginapan Di Luar Jawa Timur Di Gol II/I Orang 718,000
Pulau Jawa
1.10.28.03.01.007.011 Biaya Penginapan Di D.K.I Jakarta/Luar P Eselon I/Kepala Daerah/Ketua DPRD Orang 8,720,000
1.10.28.03.01.007.012 Biaya Penginapan Di D.K.I Jakarta/Luar P Eselon II/Anggota DPRD Orang 1,490,000
1.10.28.03.01.007.013 Biaya Penginapan Di D.K.I Jakarta/Luar P Eselon III/Gol IV Orang 992,000
1.10.28.03.01.007.014 Biaya Penginapan Di D.K.I Jakarta/Luar P Eselon IV/Gol III Orang 610,000
1.10.28.03.01.007.015 Biaya Penginapan Di D.K.I Jakarta/Luar P Gol II/I Orang 610,000
1.10.28.03.01.002 Satuan Biaya Perjalanan Dinas - Uang
Harian
1.10.28.03.01.002.001 Uang Harian Luar Kota Dalam Prov. Walikota OH 600,000

1.10.28.03.01.002.002 Uang Harian Luar Kota Dalam Prov. Wakil Walikota OH 550,000

1.10.28.03.01.002.003 Uang Harian Luar Kota Dalam Prov. Sekretaris Daerah/ Eselon II/A OH 500,000

1.10.28.03.01.002.004 Uang Harian Luar Kota Dalam Prov. Eselon II/ B OH 400,000

1.10.28.03.01.002.005 Uang Harian Luar Kota Dalam Prov. Eselon III/Auditor Madya OH 350,000

1.10.28.03.01.002.006 Uang Harian Luar Kota Dalam Prov. Eselon IV/Auditor Pertama/Muda OH 300,000

1.10.28.03.01.002.007 Uang Harian Luar Kota Dalam Prov. Golongan III dan IV OH 250,000

357
KODE URAIAN SPESIFIKASI SAT. HARGA SAT.
a b c d e
1.10.28.03.01.002.008 Uang Harian Luar Kota Dalam Prov. Golongan II dan I OH 200,000

1.10.28.03.01.002.009 Uang Harian Luar Kota Dalam Prov. Personil Honorer/Non PNS/Masyarakat OH 200,000
1.10.28.03.01.002.010 Uang Harian Luar Kota Dalam Prov. Sopir PNS/Non PNS OH 200,000

1.10.28.03.01.002.011 Uang Harian Luar Kota Dalam Prov. Ketua DPRD OH 500,000

1.10.28.03.01.002.012 Uang Harian Luar Kota Dalam Prov. Wakil Ketua DPRD OH 475,000

1.10.28.03.01.002.013 Uang Harian Luar Kota Dalam Prov. Anggota DPRD OH 450,000

1.10.28.03.01.002.014 Uang Harian Luar Jatim Di Jawa Walikota OH 1,700,000

1.10.28.03.01.002.015 Uang Harian Luar Jatim Di Jawa Wakil Walikota OH 1,600,000

1.10.28.03.01.002.016 Uang Harian Luar Jatim Di Jawa Sekretaris Daerah/ Eselon II/A OH 1,500,000

1.10.28.03.01.002.017 Uang Harian Luar Jatim Di Jawa Eselon II/ B OH 1,200,000

1.10.28.03.01.002.018 Uang Harian Luar Jatim Di Jawa Eselon III OH 1,000,000

1.10.28.03.01.002.019 Uang Harian Luar Jatim Di Jawa Eselon IV OH 750,000

1.10.28.03.01.002.020 Uang Harian Luar Jatim Di Jawa Golongan III dan IV OH 600,000

1.10.28.03.01.002.021 Uang Harian Luar Jatim Di Jawa Golongan II dan I OH 500,000

1.10.28.03.01.002.022 Uang Harian Luar Jatim Di Jawa Personil Honorer/Non PNS/Masyarakat OH 400,000
1.10.28.03.01.002.023 Uang Harian Luar Jatim Di Jawa Ketua DPRD OH 1,500,000

1.10.28.03.01.002.024 Uang Harian Luar Jatim Di Jawa Wakil Ketua DPRD OH 1,400,000

1.10.28.03.01.002.025 Uang Harian Luar Jatim Di Jawa Anggota DPRD OH 1,300,000

1.10.28.03.01.002.026 Uang Harian Ibu Kota / Luar Jawa Walikota OH 2,200,000

1.10.28.03.01.002.027 Uang Harian Ibu Kota / Luar Jawa Wakil Walikota OH 2,100,000

1.10.28.03.01.002.028 Uang Harian Ibu Kota / Luar Jawa Sekretaris Daerah/ Eselon II/A OH 2,000,000

1.10.28.03.01.002.029 Uang Harian Ibu Kota / Luar Jawa Eselon II/ B OH 1,500,000

1.10.28.03.01.002.030 Uang Harian Ibu Kota / Luar Jawa Eselon III OH 1,250,000

1.10.28.03.01.002.031 Uang Harian Ibu Kota / Luar Jawa Eselon IV OH 1,000,000

1.10.28.03.01.002.032 Uang Harian Ibu Kota / Luar Jawa Golongan III dan IV OH 800,000

1.10.28.03.01.002.033 Uang Harian Ibu Kota / Luar Jawa Golongan II dan I OH 700,000

1.10.28.03.01.002.034 Uang Harian Ibu Kota / Luar Jawa Personil Honorer/Non PNS/Masyarakat OH 600,000
1.10.28.03.01.002.035 Uang Harian Ibu Kota / Luar Jawa Ketua DPRD OH 2,000,000

1.10.28.03.01.002.036 Uang Harian Ibu Kota / Luar Jawa Wakil Ketua DPRD OH 1,900,000

1.10.28.03.01.002.037 Uang Harian Ibu Kota / Luar Jawa Anggota DPRD OH 1,800,000

1.10.28.03.01.010 Satuan Biaya Makanan Penambah


Daya Tahan Tubuh/Ekstra Puding

1.10.28.03.01.010.001 Satuan Biaya Makanan Penambah Daya OH 15,000


Tahan Tubuh/Ekstra Puding
1.10.28.03.01.011 Bantuan Uang Transport dalam
Kegiatan

358
KODE URAIAN SPESIFIKASI SAT. HARGA SAT.
a b c d e
1.10.28.03.01.011.001 Uang Transport Pemateri Pemerintah PuBantuan Uang Transport dalam Kegiatan OH 1,000,000
1.10.28.03.01.011.002 Uang Transport Pemateri Pemprov Bantuan Uang Transport dalam Kegiatan OH 400,000
1.10.28.03.01.011.003 Uang Transport Pemateri Pihak Ketiga Bantuan Uang Transport dalam Kegiatan OH 300,000
1.10.28.03.01.011.004 Transport Peserta (Dalam Kota) Bantuan Uang Transport dalam Kegiatan OH 80,000
1.10.28.03.01.011.005 Transport Peserta (Luar Kota) Bantuan Uang Transport dalam Kegiatan OH 100,000
1.10.28.03.01.011.006 Transport Tim seleksi Bantuan Uang Transport dalam Kegiatan OH 100,000
1.10.28.03.01.012 Satuan Biaya Diklat Pimpinan/
Struktural
1.10.28.03.01.012.001 Satuan Biaya Diklat Pimpinan/ Diklat Pimpinan Tk. II Peserta/ 32,000,000
Struktural Angkatan
1.10.28.03.01.012.002 Satuan Biaya Diklat Pimpinan/ Diklat Pimpinan Tk. III Peserta/ 22,000,000
Struktural Angkatan
1.10.28.03.01.012.003 Satuan Biaya Diklat Pimpinan/ Diklat Pimpinan Tk. IV Peserta/ 18,000,000
Struktural Angkatan
1.10.28.03.01.012.004 Satuan Biaya Latihan Prajabatan Golongan I dan Golongan II Peserta/ 8,000,000
Angkatan
1.10.28.03.01.012.005 Satuan Biaya Latihan Prajabatan Golongan III Peserta/ 9,500,000
Angkatan
1.10.28.03.01.013 Satuan Biaya Bantuan Beasiswa
Program Gelar / Non-Gelar Dalam
Negeri
1.10.28.03.01.013.001 Biaya Hidup dan Biaya Operasional - Satuan Biaya Bantuan Beasiswa OT 16,070,000
Diploma I dan Diploma III Program Gelar / Non-Gelar Dalam
Negeri
1.10.28.03.01.013.002 Biaya Hidup dan Biaya Operasional - Satuan Biaya Bantuan Beasiswa OT 17,010,000
Diploma IV dan Strata I Program Gelar / Non-Gelar Dalam
Negeri
1.10.28.03.01.013.003 Uang Buku dan Referensi per tahun - Satuan Biaya Bantuan Beasiswa OT 1,330,000
Diploma I Program Gelar / Non-Gelar Dalam
Negeri
1.10.28.03.01.013.004 Uang Buku dan Referensi per tahun - Satuan Biaya Bantuan Beasiswa OT 1,590,000
Diploma III Program Gelar / Non-Gelar Dalam
Negeri
1.10.28.03.01.013.005 Uang Buku dan Referensi per tahun - Satuan Biaya Bantuan Beasiswa OT 1,850,000
Diploma IV dan Strata I Program Gelar / Non-Gelar Dalam
Negeri
1.10.28.03.01.013.006 Biaya Hidup dan Biaya Operasional - Satuan Biaya Bantuan Beasiswa OT 20,690,000
Strata 2 dan Spesialis 1 Program Gelar / Non-Gelar Dalam
Negeri
1.10.28.03.01.013.007 Biaya Hidup dan Biaya Operasional - Satuan Biaya Bantuan Beasiswa OT 21,320,000
Strata 3 dan Spesialis 2 Program Gelar / Non-Gelar Dalam
Negeri
1.10.28.03.01.013.008 Uang Buku dan Referensi per tahun - Satuan Biaya Bantuan Beasiswa OT 2,120,000
Strata 2 dan Spesialis 1 Program Gelar / Non-Gelar Dalam
Negeri
1.10.28.03.01.013.009 Uang Buku dan Referensi per tahun - Satuan Biaya Bantuan Beasiswa OT 2,380,000
Strata 3 dan Spesialis 2 Program Gelar / Non-Gelar Dalam
Negeri
1.10.28.03.01.014 Biaya Tarif Dasar Listrik dan Biaya
Tambah Daya Listrik
1.10.28.03.01.014.001 Pasang Listrik Baru 1300 KWh (Belum termasuk b. Instalasi) Paket 1,107,600
1.10.28.03.01.014.002 Pasang Listrik Baru Paket 1,874,500

1.10.28.03.01.014.003 Biaya Tambah Daya Listrik Dari 450 KWh ke 900 KWh (sudah Paket 450,000
termasuk biaya instalasi)
1.10.28.03.01.014.004 Biaya Tambah Daya Listrik Dari 900 KWh ke 1300 KWh (sudah Paket 800,000
termasuk biaya instalasi)
1.10.28.03.01.014.005 Biaya Tambah Daya Listrik Dari 1300 KWh ke 2200 KWh (sudah Paket 1,200,000
termasuk biaya instalasi)
1.10.28.03.01.014.006 Biaya Tambah Daya Listrik Dari 2200 KWh ke 3500 Kwh (sudah Paket 1,499,000
termasuk biaya instalasi)
1.10.28.03.01.014.007 Tarif Dasar Listrik P-1/TR 450 VA Rp/kWh 685

359
KODE URAIAN SPESIFIKASI SAT. HARGA SAT.
a b c d e
1.10.28.03.01.014.008 Tarif Dasar Listrik P-1/TR 900 VA Rp/kWh 760

1.10.28.03.01.014.009 Tarif Dasar Listrik P-1/TR 1300 VA Rp/kWh 1,049

1.10.28.03.01.014.010 Tarif Dasar Listrik P-1/TR 2200 VA Rp/kWh 1,076

1.10.28.03.01.014.011 Tarif Dasar Listrik P-1/TR 3500 VA Rp/kWh 1,076

1.10.28.03.01.014.012 Tarif Dasar Listrik P-1/TR 4400 VA Rp/kWh 1,076

1.10.28.03.01.014.013 Tarif Dasar Listrik P-1/TR 5500 VA Rp/kWh 1,076

1.10.28.03.01.014.014 Tarif Dasar Listrik P-1/TR 6600 VA s.d 200 kVA Rp/kWh 1,467

1.10.28.03.01.014.015 Tarif Dasar Listrik P-2/TM diatas 200 kVA Rp/kWh 1,115

1.10.28.03.01.014.016 Tarif Dasar Listrik P-3/TR Rp/kWh 1,467

1.10.28.03.02 Satuan Biaya Operasional Lainnya

1.10.28.03.02.001 Upah Konstruksi Pekerjaan Dinas


Perhubungan
1.10.28.03.02.001.001 Pasang dan Stel 1 pesawat Kontroller Buah 247,800

1.10.28.03.02.001.002 Erection RPPJ Portal Unit 4,383,700

1.10.28.03.02.001.003 Biaya Penyambungan PLN Unit 2,577,700

1.10.28.03.02.001.004 Pengecatan RPPJ Portal Gapura Unit 1,108,800

1.10.28.03.02.001.005 Biaya Programming Set 2,158,800

1.10.28.03.02.002 Satuan Biaya Tiket Kereta Api dan Tiket


Pesawat
1.10.28.03.02.002.001 Tiket Kereta Api ke Jakarta Eksekutif Orang 495,000

1.10.28.03.02.002.002 Tiket Kereta Api ke Jogjakarta Eksekutif Orang 255,000

1.10.28.03.02.002.003 Tiket Kereta Api ke Solo Eksekutif Orang 255,000

1.10.28.03.02.002.004 Tiket Kereta Api ke Bandung Eksekutif Orang 460,000

1.10.28.03.02.002.005 Tiket Kereta Api ke Semarang Eksekutif Orang 305,000

1.10.28.03.02.002.006 Tiket Kereta Api ke Malang Eksekutif Orang 280,000

1.10.28.03.02.002.007 Tiket Kereta Api ke Jember Eksekutif Orang 245,000

1.10.28.03.02.002.008 Tiket Kereta Api ke Surabaya Eksekutif Orang 305,000

1.10.28.03.02.002.009 Tiket Kereta Api ke Banyuwangi Eksekutif Orang 170,000

1.10.28.03.02.002.010 Tiket Kereta Api ke Jogjakarta Bisnis Orang 205,000

1.10.28.03.02.002.011 Tiket Kereta Api ke Solo Bisnis Orang 205,000

1.10.28.03.02.002.012 Tiket Kereta Api ke Bandung Bisnis Orang 325,000

1.10.28.03.02.002.013 Tiket Kereta Api ke Malang Bisnis Orang 205,000

1.10.28.03.02.002.014 Tiket Kereta Api ke Jember Bisnis Orang 205,000

1.10.28.03.02.002.015 Tiket Kereta Api ke Surabaya Bisnis Orang 205,000

360
KODE URAIAN SPESIFIKASI SAT. HARGA SAT.
a b c d e
1.10.28.03.02.002.016 Tiket Kereta Api ke Banyuwangi Bisnis Orang 145,000

1.10.28.03.02.002.017 Tiket Kereta Api ke Jakarta Ekonomi Orang 270,000

1.10.28.03.02.002.018 Tiket Kereta Api ke Jogjakarta Ekonomi Orang 155,000

1.10.28.03.02.002.019 Tiket Kereta Api ke Solo Ekonomi Orang 120,000

1.10.28.03.02.002.020 Tiket Kereta Api ke Bandung Ekonomi Orang 94,000

1.10.28.03.02.002.021 Tiket Kereta Api ke Malang Ekonomi Orang 18,000

1.10.28.03.02.002.022 Tiket Kereta Api ke Jember Ekonomi Orang 94,000

1.10.28.03.02.002.023 Tiket Kereta Api ke Blitar Ekonomi Orang 18,000

1.10.28.03.02.002.024 Tiket Kereta Api ke Kediri Ekonomi Orang 15,000

1.10.28.03.02.002.025 Tiket Kereta Api ke Surabaya Ekonomi Orang 120,000

1.10.28.03.02.002.026 Tiket Kereta Api ke Banyuwangi Ekonomi Orang 94,000

1.10.28.03.02.002.027 Tiket Pesawat Surabaya ke Jakarta Bisnis Orang 5,466,000

1.10.28.03.02.002.028 Tiket Pesawat Surabaya ke Bandung Bisnis Orang 4,824,000

1.10.28.03.02.002.029 Tiket Pesawat Surabaya ke Aceh Bisnis Orang 10,985,000

1.10.28.03.02.002.030 Tiket Pesawat Surabaya ke Medan Bisnis Orang 10,739,000

1.10.28.03.02.002.031 Tiket Pesawat Surabaya ke Batam Bisnis Orang 8,600,000

1.10.28.03.02.002.032 Tiket Pesawat Surabaya ke Padang Bisnis Orang 9,199,000

1.10.28.03.02.002.033 Tiket Pesawat Surabaya ke Lampung Bisnis Orang 6,386,000

1.10.28.03.02.002.034 Tiket Pesawat Surabaya ke Palembang Bisnis Orang 7,690,000

1.10.28.03.02.002.035 Tiket Pesawat Surabaya ke Jambi Bisnis Orang 7,883,000

1.10.28.03.02.002.036 Tiket Pesawat Surabaya ke Pangkal Bisnis Orang 7,284,000


Pinang
1.10.28.03.02.002.037 Tiket Pesawat Surabaya ke Pekanbaru Bisnis Orang 9,241,000

1.10.28.03.02.002.038 Tiket Pesawat Surabaya ke Pontianak Bisnis Orang 8,140,000

1.10.28.03.02.002.039 Tiket Pesawat Surabaya ke Balikpapan Bisnis Orang 10,889,000

1.10.28.03.02.002.040 Tiket Pesawat Surabaya ke Banjarmasin Bisnis Orang 8,942,000

1.10.28.03.02.002.041 Tiket Pesawat Surabaya ke Bisnis Orang 8,696,000


Palangkaraya
1.10.28.03.02.002.042 Tiket Pesawat Surabaya ke Makasar Bisnis Orang 5,936,000

1.10.28.03.02.002.043 Tiket Pesawat Surabaya ke Manado Bisnis Orang 9,937,000

1.10.28.03.02.002.044 Tiket Pesawat Surabaya ke Palu Bisnis Orang 6,878,000

1.10.28.03.02.002.045 Tiket Pesawat Surabaya ke Kendari Bisnis Orang 11,103,000

1.10.28.03.02.002.046 Tiket Pesawat Surabaya ke Ambon Bisnis Orang 8,803,000

1.10.28.03.02.002.047 Tiket Pesawat Surabaya ke Denpasar Bisnis Orang 3,198,000

361
KODE URAIAN SPESIFIKASI SAT. HARGA SAT.
a b c d e
1.10.28.03.02.002.048 Tiket Pesawat Surabaya ke Mataram Bisnis Orang 3,829,000

1.10.28.03.02.002.049 Tiket Pesawat Surabaya ke Kupang Bisnis Orang 6,749,000

1.10.28.03.02.002.050 Tiket Pesawat Surabaya ke Jayapura Bisnis Orang 12,675,000

1.10.28.03.02.002.051 Tiket Pesawat Surabaya ke Biak Bisnis Orang 12,782,000

1.10.28.03.02.002.052 Tiket Pesawat Surabaya ke Timika Bisnis Orang 11,295,000

1.10.28.03.02.002.053 Tiket Pesawat Surabaya ke Jakarta Ekonomi Orang 2,674,000

1.10.28.03.02.002.054 Tiket Pesawat Surabaya ke Bandung Ekonomi Orang 2,856,000

1.10.28.03.02.002.055 Tiket Pesawat Surabaya ke Aceh Ekonomi Orang 5,744,000

1.10.28.03.02.002.056 Tiket Pesawat Surabaya ke Medan Ekonomi Orang 5,134,000

1.10.28.03.02.002.057 Tiket Pesawat Surabaya ke Batam Ekonomi Orang 4,300,000

1.10.28.03.02.002.058 Tiket Pesawat Surabaya ke Padang Ekonomi Orang 4,364,000

1.10.28.03.02.002.059 Tiket Pesawat Surabaya ke Lampung Ekonomi Orang 3,123,000

1.10.28.03.02.002.060 Tiket Pesawat Surabaya ke Palembang Ekonomi Orang 3,744,000

1.10.28.03.02.002.061 Tiket Pesawat Surabaya ke Jambi Ekonomi Orang 3,915,000

1.10.28.03.02.002.062 Tiket Pesawat Surabaya ke Pangkal Ekonomi Orang 3,626,000


Pinang
1.10.28.03.02.002.063 Tiket Pesawat Surabaya ke Pekanbaru Ekonomi Orang 4,407,000

1.10.28.03.02.002.064 Tiket Pesawat Surabaya ke Pontianak Ekonomi Orang 4,204,000

1.10.28.03.02.002.065 Tiket Pesawat Surabaya ke Balikpapan Ekonomi Orang 5,113,000

1.10.28.03.02.002.066 Tiket Pesawat Surabaya ke Banjarmasin Ekonomi Orang 4,385,000

1.10.28.03.02.002.067 Tiket Pesawat Surabaya ke Ekonomi Orang 4,385,000


Palangkaraya
1.10.28.03.02.002.068 Tiket Pesawat Surabaya ke Makasar Ekonomi Orang 3,433,000

1.10.28.03.02.002.069 Tiket Pesawat Surabaya ke Manado Ekonomi Orang 5,262,000

1.10.28.03.02.002.070 Tiket Pesawat Surabaya ke Palu Ekonomi Orang 3,883,000

1.10.28.03.02.002.071 Tiket Pesawat Surabaya ke Kendari Ekonomi Orang 5,466,000

1.10.28.03.02.002.072 Tiket Pesawat Surabaya ke Ambon Ekonomi Orang 4,845,000

1.10.28.03.02.002.073 Tiket Pesawat Surabaya ke Denpasar Ekonomi Orang 1,979,000

1.10.28.03.02.002.074 Tiket Pesawat Surabaya ke Mataram Ekonomi Orang 2,321,000

1.10.28.03.02.002.075 Tiket Pesawat Surabaya ke Kupang Ekonomi Orang 3,722,000

1.10.28.03.02.002.076 Tiket Pesawat Surabaya ke Jayapura Ekonomi Orang 7,231,000

1.10.28.03.02.002.077 Tiket Pesawat Surabaya ke Biak Ekonomi Orang 7,081,000

1.10.28.03.02.002.078 Tiket Pesawat Surabaya ke Timika Ekonomi Orang 6,589,000

1.10.28.03.02.002.281 Tiket Pesawat Surabaya ke Tarakan Ekonomi Orang 2,552,500

362
KODE URAIAN SPESIFIKASI SAT. HARGA SAT.
a b c d e
1.10.28.03.02.002.282 Tiket Pesawat Surabaya ke Tarakan Ekonomi Orang 2,903,400

1.10.28.03.02.002.283 Tiket Pesawat Surabaya ke Tarakan Ekonomi Orang 4,433,500

1.10.28.03.02.003 Satuan Biaya Tarif Internet, Hot


Spot/Wifi ID, Fiber Optik, IP Address

1.10.28.03.02.003.001 Tarif Internet Indihome Paket Deluxe - Triple Play (10 Bulan 506,000
mps; 1000 menit nelpon
lokal/interlokal; UseeTV; Movin basic)

1.10.28.03.02.003.002 Tarif Internet Indihome Paket Premium - Triple Play Bulan 693,000
(20 mps; 1000 menit nelpon
lokal/interlokal; UseeTV; Movin basic)

1.10.28.03.02.003.003 Tarif Internet Indihome Paket Premium - Triple Play Bulan 902,000
(30 mps; 1000 menit nelpon
lokal/interlokal; UseeTV; Movin basic)

1.10.28.03.02.003.004 Tarif Internet Indihome Paket Premium - Triple Play Bulan 1,094,500
(40 mps; 1000 menit nelpon
lokal/interlokal; UseeTV; Movin basic)

1.10.28.03.02.003.005 Tarif Internet Indihome Paket Premium - Triple Play Bulan 1,375,000
(50 mps; 1000 menit nelpon
lokal/interlokal; UseeTV; Movin basic)

1.10.28.03.02.003.006 Tarif Internet Indihome Paket Premium - Triple Play Bulan 1,925,000
(100 mps; 1000 menit nelpon
lokal/interlokal; UseeTV; Movin basic)

1.10.28.03.02.003.007 Biaya Pasang Baru Internet Indihome - Triple Play Per Kegiatan 75,000
1.10.28.03.02.003.008 Tarif Internet Indihome Paket Netizen I - Dual Play Bulan 313,500
(10 mps; 1000 menit nelpon
lokal/interlokal; Movin basic)
1.10.28.03.02.003.009 Tarif Internet Indihome Paket Netizen I - Dual Play Bulan 423,500
(20 mps; 1000 menit nelpon
lokal/interlokal; Movin basic)
1.10.28.03.02.003.010 Tarif Internet Indihome Paket Netizen I - Dual Play Bulan 599,500
(30 mps; 1000 menit nelpon
lokal/interlokal; Movin basic)
1.10.28.03.02.003.011 Tarif Internet Indihome Paket Netizen I - Dual Play Bulan 709,500
(40 mps; 1000 menit nelpon
lokal/interlokal; Movin basic)
1.10.28.03.02.003.012 Tarif Internet Indihome Paket Netizen II - Dual Play Bulan 346,500
(10 mps; 1000 menit nelpon
lokal/interlokal; Movin basic)
1.10.28.03.02.003.013 Tarif Internet Indihome Paket Netizen II - Dual Play Bulan 456,500
(20 mps; 1000 menit nelpon
lokal/interlokal; Movin basic)
1.10.28.03.02.003.014 Tarif Internet Indihome Paket Netizen II - Dual Play Bulan 632,500
(30 mps; 1000 menit nelpon
lokal/interlokal; Movin basic)
1.10.28.03.02.003.015 Tarif Internet Indihome Paket Netizen II - Dual Play Bulan 742,500
(40 mps; 1000 menit nelpon
lokal/interlokal; Movin basic)
1.10.28.03.02.003.016 Biaya Pasang Baru Internet Indihome - Dual Play Per Kegiatan 150,000
1.10.28.03.02.003.017 Hot Spot / Wifi ID Telkom Bulan 550,000
1.10.28.03.02.003.018 ISP Fiber Optik 2 Mbps Bulan 4,059,000
1.10.28.03.02.003.019 ISP Fiber Optik 20 Mbps Bulan 7,360,732
1.10.28.03.02.003.020 ISP Fiber Optik 100 Mbps Bulan 95,287,500
1.10.28.03.02.003.021 ISP Fiber Optik 150 Mbps Internasional Bulan 140,250,000
1.10.28.03.02.003.022 IP Address /24 Tahun 9,072,000
1.10.28.03.02.003.023 Biaya Instalasi Pemasangan IP Address Kali 5,600,000
1.10.28.03.02.003.024 Langganan BIZNET 10 Mbps Bulan 5,600,000

363
KODE URAIAN SPESIFIKASI SAT. HARGA SAT.
a b c d e
1.10.28.03.02.003.025 Langganan BIZNET 15 Mbps Bulan 8,400,000
1.10.28.03.02.003.026 Langganan BIZNET 20 Mbps Bulan 11,200,000
1.10.28.03.02.003.027 Langganan BIZNET 25 Mbps Bulan 14,000,000
1.10.28.03.02.003.028 Biaya Telepon Tarif Telpon Biasa Menit 250
1.10.28.03.02.004 Satuan Biaya Perpanjangan STNK dan
Uji Kir
1.10.28.03.02.004.001 Biaya Perpanjangan STNK Jenis Sedan: Toyota Corolla,Honda Unit/Tahun 2,350,000
Accord/ sekelas/semua tipe
1.10.28.03.02.004.002 Biaya Perpanjangan STNK Jenis MPV: Toyota Innova, Unit/Tahun 1,350,000
Avanza,Daihatsu /sekelas/semua tipe

1.10.28.03.02.004.003 Biaya Perpanjangan STNK Jenis SUV: Toyota Fortuner, Nissan Unit/Tahun 1,950,000
Xtrail/ sekelas/semua tipe
1.10.28.03.02.004.004 Biaya Perpanjangan STNK Jenis Van/Mini Bus: Suzuki APV, Unit/Tahun 750,000
Carry/sekelas/semua tipe
1.10.28.03.02.004.005 Biaya Perpanjangan STNK Jenis Pick Up: Toyota Hiluk, Suzuki Unit/Tahun 750,000
Carry/ sekelas/semua tipe
1.10.28.03.02.004.006 Biaya Perpanjangan STNK Jenis Roda 2: Standart semua tipe Unit/Tahun 300,000

1.10.28.03.02.004.007 Biaya Uji Kir Kendaraan Bermotor JBB tidak melebihi Unit 80,000
3500 kg
1.10.28.03.02.004.008 Biaya Uji Kir Kendaraan Bermotor JBB lebih dari Unit 100,000
3500 kg
1.10.28.03.02.004.009 Biaya Pembuatan Buku Uji Kir Rusak, JBB kurang dari sama dengan Buku 30,000
3500 kg
1.10.28.03.02.004.010 Biaya Pembuatan Buku Uji Kir Rusak, JBB lebih dari 3500 kg Buku 35,000

1.10.28.03.02.004.011 Biaya Pembuatan Buku Uji Kir Hilang, JBB kurang dari sama dengan Buku 50,000
3500 kg
1.10.28.03.02.004.012 Biaya Pembuatan Buku Uji Kir Hilang, JBB lebih dari 3500 kg Buku 60,000

1.10.28.03.02.004.013 Biaya Pembuatan Buku Uji Kir Habis masa berlakunya Buku 25,000

1.10.28.03.02.004.014 Biaya Tanda Uji Rusak, JBB kurang dari sama dengan Buku 15,000
3500 kg
1.10.28.03.02.004.015 Biaya Tanda Uji Rusak, JBB lebih dari 3500 kg Buku 20,000

1.10.28.03.02.004.016 Biaya Tanda Uji Hilang, JBB kurang dari sama dengan Buku 20,000
3500 kg
1.10.28.03.02.004.017 Biaya Tanda Uji Hilang, JBB lebih dari 3500 kg Buku 30,000

1.10.28.03.02.004.018 Biaya Tanda Samping Uji Rusak, Hilang, Habis masa berlakunya Buku 30,000
1.10.28.03.02.004 Satuan Biaya Premi Asuransi
1.10.28.03.02.004.001 Biaya Premi Asuransi BPJS Ketenagakerjaan Bulan 107,000

1.10.28.03.02.004.002 Biaya Premi Asuransi BPJS Kesehatan Bulan 80,000

1.10.28.03.02.004.003 Premi Asuransi Kebakaran Untuk OPD Pasar tahun 50,000,000

1.10.28.03.02.005 Satuan Biaya Berlangganan (Surat


Kabar, Majalah, Tabloid dan Buku
Bahan Bacaan)

1.10.28.03.02.005.001 Berlangganan Surat Kabar Koran Harian(Jawa Pos) eksemplar 150,000

1.10.28.03.02.005.009 Berlangganan Majalah Majalah Mingguan (Tempo) buah 200,000

1.10.28.03.02.005.011 Berlangganan Tabloid PC Plus mingguan 20,000

1.10.28.03.02.007 Satuan Biaya Tarif Dasar Air minum,


Pemeliharaan, Administrasi,
Pemasangan PDAM

364
KODE URAIAN SPESIFIKASI SAT. HARGA SAT.
a b c d e
1.10.28.03.02.007.001 Biaya Tarif Air minum PDAM Kode tarif IV; Blok Pemakaian (0 - 10) m3 1,675
m3
1.10.28.03.02.007.002 Biaya Tarif Air minum PDAM Kode tarif IV; Blok Pemakaian (11 - 20) m3 2,230
m3
1.10.28.03.02.007.003 Biaya Tarif Air minum PDAM Kode tarif IV; Blok Pemakaian (21 - 30) m3 3,345
m3
1.10.28.03.02.007.004 Biaya Tarif Air minum PDAM Kode tarif IV; Blok Pemakaian diatas 30 m3 5,575
m3
1.10.28.03.02.007.005 Biaya Pemeliharaan Meter dan Biaya AdmGolongan Instansi Pemerintah Unit 12,000
1.10.28.03.02.007.006 Biaya Pemasangan Sambungan Golongan Instansi Pemerintah Paket 850,000
Pelanggan Baru/Pipa Dinas
1.10.28.03.02.008 Satuan Biaya Jaminan Kesehatan Total
Coverage - Dinas Kesehatan

1.10.28.03.02.008.001 Pelayanan Kesehatan Semesta (Total Dinas Kesehatan Premi/org 2,305,000


Coverage)
1.10.28.03.02.009 Satuan Biaya Kepesertaan
1.10.28.03.02.009.001 Biaya Kepesertaan Biaya Kontribusi Pelatihan BCLS (bagi Org/Paket 1,000,000
perawat)
1.10.28.03.02.009.002 Biaya Kepesertaan Biaya Kontribusi Pelatihan ACLS (bagi Org/Paket 3,250,000
dokter umum)
1.10.28.03.02.009.003 Biaya Kepesertaan Biaya Kontribusi Pelatihan ACLS (bagi Org/Paket 1,400,000
perawat)
1.10.28.03.02.009.004 Biaya Kepesertaan Biaya Kontribusi Pelatihan ATLS Org/Paket 5,000,000

1.10.28.03.02.009.005 Biaya Kepesertaan Biaya Kontribusi Pelatihan PPGD Org/Paket 2,500,000

1.10.28.03.02.009.006 Biaya Kepesertaan Biaya Kontribusi Pelatihan Manajemen Org/Paket 4,800,000


Puskesmas
1.10.28.03.02.009.007 Biaya Kepesertaan Biaya Kontribusi Pelatihan Akreditasi Org/Paket 3,600,000
Puskesmas
1.10.28.03.02.009.008 Biaya Kepesertaan Biaya Kontribusi Pelatihan Pendamping Org/Paket 5,400,000
Akreditasi FKTP
1.10.28.03.02.009.009 Biaya Kepesertaan Biaya Kontribusi Pelaksanaan Survailan Org/Paket 3,500,000
Akreditasi Lab
1.10.28.03.02.009.010 Biaya Kepesertaan Iuran Akreditasi KAN tahun 1,000,000

1.10.28.03.02.009.011 Biaya Kepesertaan Pelatihan PPGDON Paket 12,900,000

1.10.28.03.02.009.012 Biaya Kepesertaan Pelatihan ICU Paket 48,000,000

1.10.28.03.02.009.013 Biaya Kepesertaan Pelatihan ICCU Paket 16,900,000

1.10.28.03.02.009.014 Biaya Kepesertaan Pelatihan NICU Paket 17,400,000

1.10.28.03.02.009.015 Biaya Kepesertaan Pelatihan ANESTESI Paket 29,200,000

1.10.28.03.02.009.016 Biaya Kepesertaan Pelatihan HEMODIALISA Paket 36,000,000

1.10.28.03.02.009.017 Biaya Kepesertaan Pelatihan INSTRUMEN KMR OPERASI Paket 43,400,000


1.10.28.03.02.009.018 Biaya Kepesertaan Pelatihan K3 Paket 21,800,000

1.10.28.03.02.009.019 Biaya Kepesertaan Pelatihan PLEBOTOMY Paket 12,800,000

1.10.28.03.02.009.020 Biaya Kepesertaan Survei Simulasi Akreditasi Paket 50,000,000

1.10.28.03.02.009.021 Biaya Kepesertaan Pelatihan PPI Lanjutan Paket 7,400,000

1.10.28.03.02.009.022 Biaya Kepesertaan Pelatihan Loundry Paket 7,800,000

1.10.28.03.02.009.023 Biaya Kepesertaan Pelatihan PPGD Paket 14,135,000

1.10.28.03.02.009.024 Biaya Kepesertaan Pelatihan Bedah Mata Paket 20,450,000

365
KODE URAIAN SPESIFIKASI SAT. HARGA SAT.
a b c d e
1.10.28.03.02.009.025 Biaya Kepesertaan Pelatihan Teknik Analisa Mikrobiologi Air PerOrang 7,000,000

1.10.28.03.02.009.026 Biaya Kepesertaan Pelatihan Jaminan Mutu Hasil Pengujian PerOrang 5,000,000

1.10.28.03.02.009.027 Biaya Kepesertaan Pelatihan Mikrobiologi Klinik PerOrang 4,500,000

1.10.28.03.02.009.028 Biaya Kepesertaan Konstribusi dan Akomodasi Pelatihan Te Org/Kali 5,000,000

1.10.28.03.02.009.029 Biaya Kepesertaan Training dan sertifikasi Certified Ethical H Paket 13,500,000

1.10.28.03.02.009.030 Biaya Kepesertaan Instalasi Langganan SSL comodo wildcard Paket 850,000

1.10.28.03.02.009.031 Biaya Kepesertaan Training Android Paket 6,500,000

1.10.28.03.02.009.032 Biaya Kepesertaan Training Building Web Application Paket 7,500,000

1.10.28.03.02.010 Satuan Biaya Taksi Perjalanan Dinas


Dalam Negeri
1.10.28.03.02.010.001 Satuan Biaya Taksi Aceh Orang/Kali 123,000

1.10.28.03.02.010.002 Satuan Biaya Taksi Sumatera Utara Orang/Kali 232,000

1.10.28.03.02.010.003 Satuan Biaya Taksi Riau Orang/Kali 94,000

1.10.28.03.02.010.004 Satuan Biaya Taksi Kepulauan Riau Orang/Kali 137,000

1.10.28.03.02.010.005 Satuan Biaya Taksi Jambi Orang/Kali 147,000

1.10.28.03.02.010.006 Satuan Biaya Taksi Sumatera Barat Orang/Kali 190,000

1.10.28.03.02.010.007 Satuan Biaya Taksi Sumatera Selatan Orang/Kali 128,000

1.10.28.03.02.010.008 Satuan Biaya Taksi Lampung Orang/Kali 167,000

1.10.28.03.02.010.009 Satuan Biaya Taksi Bengkulu Orang/Kali 109,000

1.10.28.03.02.010.010 Satuan Biaya Taksi Bangka Belitung Orang/Kali 90,000

1.10.28.03.02.010.011 Satuan Biaya Taksi Banten Orang/Kali 446,000

1.10.28.03.02.010.012 Satuan Biaya Taksi Jawa Barat Orang/Kali 166,000

1.10.28.03.02.010.013 Satuan Biaya Taksi DKI Jakarta Orang/Kali 256,000

1.10.28.03.02.010.014 Satuan Biaya Taksi Jawa Tengah Orang/Kali 75,000

1.10.28.03.02.010.015 Satuan Biaya Taksi DI Jogjakarta Orang/Kali 118,000

1.10.28.03.02.010.016 Satuan Biaya Taksi Jawa Timur Orang/Kali 194,000

1.10.28.03.02.010.017 Satuan Biaya Taksi Bali Orang/Kali 159,000

1.10.28.03.02.010.018 Satuan Biaya Taksi Nusa Tenggara Barat Orang/Kali 231,000

1.10.28.03.02.010.019 Satuan Biaya Taksi Nusa Tenggara Timur Orang/Kali 108,000

1.10.28.03.02.010.020 Satuan Biaya Taksi Kalimantan Barat Orang/Kali 135,000

1.10.28.03.02.010.021 Satuan Biaya Taksi Kalimantan Tengah Orang/Kali 111,000

1.10.28.03.02.010.022 Satuan Biaya Taksi Kalimantan Selatan Orang/Kali 150,000

1.10.28.03.02.010.023 Satuan Biaya Taksi Kalimantan Timur Orang/Kali 450,000

366
KODE URAIAN SPESIFIKASI SAT. HARGA SAT.
a b c d e
1.10.28.03.02.010.024 Satuan Biaya Taksi Kalimantan Utara Orang/Kali 102,000

1.10.28.03.02.010.025 Satuan Biaya Taksi Sulawesi Utara Orang/Kali 138,000

1.10.28.03.02.010.026 Satuan Biaya Taksi Gorontalo Orang/Kali 240,000

1.10.28.03.02.010.027 Satuan Biaya Taksi Sulawesi Barat Orang/Kali 313,000

1.10.28.03.02.010.028 Satuan Biaya Taksi Sulawesi Selatan Orang/Kali 145,000

1.10.28.03.02.010.029 Satuan Biaya Taksi Sulawesi Tengah Orang/Kali 165,000

1.10.28.03.02.010.030 Satuan Biaya Taksi Sulawesi Tenggara Orang/Kali 171,000

1.10.28.03.02.010.031 Satuan Biaya Taksi Maluku Orang/Kali 240,000

1.10.28.03.02.010.032 Satuan Biaya Taksi Maluku Utara Orang/Kali 215,000

1.10.28.03.02.010.033 Satuan Biaya Taksi Papua Orang/Kali 431,000

1.10.28.03.02.010.034 Satuan Biaya Taksi Papua Barat Orang/Kali 182,000

1.10.28.03.02.099 Satuan Biaya Operasional Lain - lain

1.10.28.03.02.099.001 Pemberian Jaminan Sosial bagi Kegiatan Dinas Sosial OB 700,000


Disabilitas Berat
1.10.28.03.02.099.002 Uang saku wartawan jumpa pers OH 150,000

1.10.28.03.02.099.003 Uang saku wartawan peliputan inspeksi mendadak OH 150,000


1.10.28.03.02.099.006 Biaya Kontribusi APEKSI Keg/thn 30,000,000

1.10.28.03.02.099.007 Biaya Operasional Pemeliharaan Paket/Tahun 65,000,000


Dashboard Monitoring E Transchool
Mojo
1.10.28.03.02.099.008 Langganan Domain Domain : COM, NET,ORG/ sejenisnya Paket/Tahun 135,000
1.10.28.03.02.099.009 Langganan Domain Domain : ID Paket/Tahun 250,000
1.10.28.03.02.099.010 Biaya Operasional RT/RW OB 200,000

1.10.28.03.02.099.011 Transport Sidak / Jumpa pers Wartawan OK 1,500,000

1.10.28.03.02.099.012 Jasa Pelayanan Angkutan Sekolah Gratis Hari/Kendara 82,500


Memakai Mikrolet an/Kali
1.10.28.03.02.099.013 Bea Balik Nama (BNN) Bus Mini unit 25,000,000
1.10.28.03.02.099.014 Biaya Penilaian Perluasan Ruang Lingkup paket 5,000,000
1.10.28.03.02.099.015 General Check-up Paket Executive : Pemeriksaan Fisik, Orang/Tahun 1,500,000
Rontgen Foto Thorax, THT,Mata, Gigi,
USG,EKG,Pemeriksaan Laboratorium.

1.10.28.03.02.099.016 Biaya Kontribusi FORSESDASI Keg/thn 10,000,000

1.10.28.03.02.099.017 PMT Posyandu Barang diserahkan ke Masyarakat Bulan 100,000

1.10.28.03.02.099.018 Biaya Pengelolaan Sampah Medis dan Limbah B3 Kg 16,500


1.10.28.03.02.099.019 Biaya Pajak PBB Aset Pemkot Mojokerto Tahun 49,980,000

1.10.28.03.02.099.021 Langganan Cloudflare PRO Professional website, blogs and portfolio Paket 270,000
1.10.28.03.02.099.022 Langganan Cloudflare BUSINESS Business Advanced security and Paket 2,700,000
performance
1.10.28.03.02.099.023 Langganan SSL Standart Tahun 2,362,500

1.10.28.03.02.099.024 Langganan SSL Wildcare Tahun 8,032,500

367
KODE URAIAN SPESIFIKASI SAT. HARGA SAT.
a b c d e
1.10.28.03.02.099.025 Bagi Hasil Retribusi Parkir Berlangganan Tahun 798,228,000
Konvensional
1.10.28.03.02.099.026 Biaya Pengganti Buku Cek Bank Jatim Buku 125,000

1.10.28.03.02.099.027 Biaya Pemberangkatan UMROH Sudah termasuk Pengurusan Paspor Orang 50,000,000
dan Chek Up kesehatan
1.10.28.03.02.099.028 Biaya Sertifikat Tanah Asset m2 300

368
SATUAN BIAYA e-TOL (PERJALANAN DINAS)
PEMERINTAH KOTA MOJOKERTO TA 2019
ZONA
Jalur Tol Tarif
A B C D
Ngawi-Kertosono (Wilangan) 52,000 44,000 98,000 74,000 58,500
Kertosono-Mojokerto 46,000 92,400 205,800 155,400 122,850
Mojokerto-Surabaya 36,000
Surabaya-Gempol dan Kejapanan-Gempol 7,500
Gempol-Rembang 14,500
Surabaya-Madura 15,000

KETERANGAN :
ZONA Perjalanan Dinas Luar Kota Di Dalam Propinsi Jawa Timur
a.Zona A meliputi: Kabupaten Mojokerto, Kabupaten Jombang, Kabupaten Sidoarjo, Kota Surabaya, Kabupaten Gresik.

b.Zona B meliputi: Kabupaten Lamongan, Kabupaten Nganjuk, Kabupaten Kediri, Kota Kediri,Kabupaten Pasuruan, Kota
c.Zona C meliputi: Kabupaten Blitar, Kota Blitar, Kabupaten Tulungagung, Kabupaten Probolinggo, Kota Probolinggo, Kabupaten
Tuban, Kabupaten Bojonegoro, Kabupaten Ponorogo, Kabupaten Magetan, Kabupaten Ngawi.
d.Zona D meliputi: Kabupaten Trenggalek, Kabupaten Lumajang, Kabupaten Jember, Kabupaten Bondowoso, Kabupaten
SituBondo, Kabupaten Banyuwangi, Kabupaten Bangkalan, Kabupaten Sampang, Kabupaten Pamekasan, Kabupaten Sumenep.

ZONA Tol Perjalanan Dinas Luar Kota Di Dalam Propinsi Jawa Timur
Zona A dari Mojokerto - Surabaya di tambah Gate ke bandara
Zona B dari Mojokerto - Kertosono ditambah Kertosono - Ngawi
Zona C dari Mojokerto - Kertosono ditambah gresik-lamongan
Zona D dari Mojokerto -Surabaya ditambah Surabaya-Gempol dan Kejapanan-Gempol ditambah SURAMADU

369
PENJELASAN
UANG HARIAN PERJALANAN DINAS

URAIAN KLASIFIKASI SAT. Uang Uang Uang Saku Transport


Harian Makan Lokal
Satuan Biaya Perjalanan Dinas Luar Kota Di Dalam Walikota OH 600,000 71,000 335,000 194,000
Propinsi Jawa Timur
Satuan Biaya Perjalanan Dinas Luar Kota Di Dalam Wakil Walikota OH 550,000 65,000 296,000 189,000
Propinsi Jawa Timur
Satuan Biaya Perjalanan Dinas Luar Kota Di Dalam Sekretaris Daerah/ OH 500,000 59,000 257,000 184,000
Propinsi Jawa Timur Eselon II/A
Satuan Biaya Perjalanan Dinas Luar Kota Di Dalam Eselon II/ B OH 400,000 53,000 168,000 179,000
Propinsi Jawa Timur
Satuan Biaya Perjalanan Dinas Luar Kota Di Dalam Eselon III/Auditor Madya OH 350,000 47,000 129,000 174,000
Propinsi Jawa Timur
Satuan Biaya Perjalanan Dinas Luar Kota Di Dalam Eselon IV/Auditor OH 300,000 41,000 90,000 169,000
Propinsi Jawa Timur Pertama/Muda
Satuan Biaya Perjalanan Dinas Luar Kota Di Dalam Golongan III dan IV OH 250,000 35,000 51,000 164,000
Propinsi Jawa Timur
Satuan Biaya Perjalanan Dinas Luar Kota Di Dalam Golongan II dan I OH 200,000 29,000 12,000 159,000
Propinsi Jawa Timur
Satuan Biaya Perjalanan Dinas Luar Kota Di Dalam Personil Honorer/Non OH 200,000 29,000 17,000 154,000
Propinsi Jawa Timur PNS/Masyarakat
Satuan Biaya Perjalanan Dinas Luar Kota Di Dalam Sopir PNS/Non PNS OH 200,000 29,000 12,000 159,000
Propinsi Jawa Timur
Satuan Biaya Perjalanan Dinas Luar Kota Di Dalam Ketua DPRD OH 500,000 71,000 240,000 189,000
Propinsi Jawa Timur
Satuan Biaya Perjalanan Dinas Luar Kota Di Dalam Wakil Ketua DPRD OH 475,000 65,000 226,000 184,000
Propinsi Jawa Timur
Satuan Biaya Perjalanan Dinas Luar Kota Di Dalam Anggota DPRD OH 450,000 59,000 212,000 179,000
Propinsi Jawa Timur
Satuan Biaya Perjalanan Dinas Di Luar Jawa Timur Walikota OH 1,700,000 73,000 1,371,000 256,000
Di Pulau Jawa
Satuan Biaya Perjalanan Dinas Di Luar Jawa Timur Wakil Walikota OH 1,600,000 67,000 1,282,000 251,000
Di Pulau Jawa
Satuan Biaya Perjalanan Dinas Di Luar Jawa Timur Sekretaris Daerah/ OH 1,500,000 61,000 1,193,000 246,000
Di Pulau Jawa Eselon II/A
Satuan Biaya Perjalanan Dinas Di Luar Jawa Timur Eselon II/ B OH 1,200,000 55,000 904,000 241,000
Di Pulau Jawa
Satuan Biaya Perjalanan Dinas Di Luar Jawa Timur Eselon III OH 1,000,000 49,000 715,000 236,000
Di Pulau Jawa
Satuan Biaya Perjalanan Dinas Di Luar Jawa Timur Eselon IV OH 750,000 43,000 476,000 231,000
Di Pulau Jawa
Satuan Biaya Perjalanan Dinas Di Luar Jawa Timur Golongan III dan IV OH 600,000 37,000 337,000 226,000
Di Pulau Jawa
Satuan Biaya Perjalanan Dinas Di Luar Jawa Timur Golongan II dan I OH 500,000 31,000 248,000 221,000
Di Pulau Jawa
Satuan Biaya Perjalanan Dinas Di Luar Jawa Timur Personil Honorer/Non OH 400,000 31,000 153,000 216,000
Di Pulau Jawa PNS/Masyarakat
Satuan Biaya Perjalanan Dinas Di Luar Jawa Timur Ketua DPRD OH 1,500,000 73,000 1,181,000 246,000
Di Pulau Jawa
Satuan Biaya Perjalanan Dinas Di Luar Jawa Timur Wakil Ketua DPRD OH 1,400,000 67,000 1,092,000 241,000
Di Pulau Jawa
Satuan Biaya Perjalanan Dinas Di Luar Jawa Timur Anggota DPRD OH 1,300,000 61,000 1,003,000 236,000
Di Pulau Jawa
Satuan Biaya Perjalanan Dinas Di D.K.I Walikota OH 2,200,000 77,000 1,673,000 450,000
Jakarta/Luar Pulau Jawa
Satuan Biaya Perjalanan Dinas Di D.K.I Wakil Walikota OH 2,100,000 71,000 1,584,000 445,000
Jakarta/Luar Pulau Jawa
Satuan Biaya Perjalanan Dinas Di D.K.I Sekretaris Daerah/ OH 2,000,000 65,000 1,495,000 440,000
Jakarta/Luar Pulau Jawa Eselon II/A
Satuan Biaya Perjalanan Dinas Di D.K.I Eselon II/ B OH 1,500,000 59,000 1,006,000 435,000
Jakarta/Luar Pulau Jawa
Satuan Biaya Perjalanan Dinas Di D.K.I Eselon III OH 1,250,000 53,000 767,000 430,000
Jakarta/Luar Pulau Jawa

370
URAIAN KLASIFIKASI SAT. Uang Uang Uang Saku Transport
Harian Makan Lokal
Satuan Biaya Perjalanan Dinas Di D.K.I Eselon IV OH 1,000,000 47,000 528,000 425,000
Jakarta/Luar Pulau Jawa
Satuan Biaya Perjalanan Dinas Di D.K.I Golongan III dan IV OH 800,000 41,000 339,000 420,000
Jakarta/Luar Pulau Jawa
Satuan Biaya Perjalanan Dinas Di D.K.I Golongan II dan I OH 700,000 35,000 250,000 415,000
Jakarta/Luar Pulau Jawa
Satuan Biaya Perjalanan Dinas Di D.K.I Personil Honorer/Non OH 600,000 35,000 155,000 410,000
Jakarta/Luar Pulau Jawa PNS/Masyarakat
Satuan Biaya Perjalanan Dinas Di D.K.I Ketua DPRD OH 2,000,000 77,000 1,483,000 440,000
Jakarta/Luar Pulau Jawa
Satuan Biaya Perjalanan Dinas Di D.K.I Wakil Ketua DPRD OH 1,900,000 71,000 1,394,000 435,000
Jakarta/Luar Pulau Jawa
Satuan Biaya Perjalanan Dinas Di D.K.I Anggota DPRD OH 1,800,000 65,000 1,305,000 430,000
Jakarta/Luar Pulau Jawa

WAKIL WALIKOTA MOJOKERTO

TTD

SUYITNO

371

Anda mungkin juga menyukai