TOTAL I 205,000,000.00
Sub Total
2.2. BIAYA BAHAN HABIS PAKAI
1 Kertas HVS A4 5 rim 50,000.00
2 Kertas HVS A3 1 rim 75,000.00
3 Tinta Printer 8 buah 200,000.00
4 Alat Tulis 1 ls 1,000,000.00
Sub Total
2.3. BIAYA PELAPORAN
1 Draft Laporan Akhir 2 eksemplar 500,000.00
2 Laporan Akhir 2 eksemplar 1,000,000.00
Sub Total
TOTAL II
PEKERJAAN DED CONVEYOR SYSTEM
RINCIAN ANGGARAN BIAYA
TOTAL Rp
ED CONVEYOR SYSTEM
ANGGARAN BIAYA
Jumlah
(Rp)
2,000,000.00
2,000,000.00
2,000,000.00
6,000,000.00
250,000.00
75,000.00
1,600,000.00
1,000,000.00
2,925,000.00
1,000,000.00
2,000,000.00
3,000,000.00
11,925,000.00
ED CONVEYOR SYSTEM
ANGGARAN BIAYA
205,000,000.00
11,925,000.00
216,925,000.00
PEKERJAAN DED CONVEYOR SYSTEM
JADWAL PELAKSANAAN PEKERJAAN
MINGGU
NO. URAIAN PEKERJAAN
1 2 3 4
1 Desk Study & Pengumpulan Data Sekunder
2 Survey Lapangan 1
3 Draft Laporan Awal Pekerjaan
- Perhitungan
- Gambar
4 Laporan Awal Pekerjaan
5 Presentasi I
6 Revisi
7 Draft Laporan Akhir
- Perhitungan
- Gambar
8 Laporan Akhir Pekerjaan
9 Presentasi II
10 Revisi
STEM
JAAN
MINGGU
5 6 7 8