Jumlah 100.00
Rencana Minggu Ini 0.00 6.73 4.55 20.43 24.98 24.98 18.33
Rencana Kumulatif Minggu Ini 0.00 6.73 11.28 31.71 56.69 81.67 100.00
Realisasi Minggu Ini
Realisasi Kumulatif Minggu Ini
Deviasi
Sinamar, Januari 2020
Diketahui Oleh Disetujui Oleh Dilaksanakan Oleh Dibuat Oleh
Camat Asam Jujuhan Wali Nagari Sinamar Tim Teknis Kegiatan
(IMAM MAHFURI, SE ) ( MARZUKI ) (………………………..) ( RANNY YULIA )
NIP.
REKAPITULASI RENCANA ANGGARAN BIAYA
JUMLAH
No. Uraian Volume Satuan BAHAN UPAH ALAT
HARGA
a b c d e f g h
PEKERJAAN
a b d c
Diketahui Oleh
Camat Asam Jujuhan
(IMAM MAHFURI, SE )
NIP.
RINCIAN RENCANA ANGG
UPAH / MATERIAL
JUMLAH
JENIS UPAH/MATERIAL SATUAN INDEKS PEKERJA/
MATERIAL
e i g h=(c x g)
Disetujui Oleh
Wali Nagari Sinamar
( MARZUKI )
RINCIAN RENCANA ANGGARAN BIAYA (RAB)
AL SUMBER DANA
HRG SATUAN JMLH HARGA DANA DESA SWADAYA
UPAH / (Rp) (Rp) (Rp)
MATERIAL (Rp)
j k=(h x j) l m
17,833,450.00 17,833,450.00
1,055,000.00
18,888,450.00
18,888,000.00
Dilaksanakan Oleh
(………………………..)
BAHAN /
UPAH
MATERIAL
n o
950,000.00 950,000.00
( RANNY YULIA )
KE
PERALATAN TERA
NGAN
p q
- 16,763,443.00
0.00 117,834,601.59 263,750.00
DAFTAR HARGA SATUAN UPAH, BAHAN DAN ALAT
Satuan
Harga Satuan
No. Uraian
(Rp)
A UPAH
1 Tukang OH 115,000.00
2 Pekerja OH 95,000.00
B BAHAN
Bahan Kali
2 Pasir urug M3 78,750.00
3 Pasir Pasang M3 147,000.00
4 Pasir beton M3 178,500.00
5 koral beton M3 250,000.00
Bahan Kayu
1 Kayu balok 5/7 Btg 23,800.00
2 Kayu papan bekesting M3 1,700,000.00
3 Kayu kelas III M4 2,100,000.00
4 Balok kayu kelas II M5 3,000,000.00
5 Dolken kayu galam, Btg 9,000.00
6 Plywood tebal 9 mm Lbr 168,400.00
Bahan Kayu
1 Besi beton (polos/ulir) Kg 11,500.00
2 Besi Ø 12 Btg Err:509
3 Besi Ø 10 Btg Err:509
4 Besi Ø 8 Btg Err:509
5 Kawat beton Kg 22,500.00
6 Paku 5 cm – 10 cm Kg 18,300.00
7 Paku 5 cm – 12 cm Kg 18,300.00
8 Paku biasa 2"-5" Kg 18,300.00
Bahan Cat
1 Cat Dasar Tembok Kg 20,000.00
2 Cat Penutup Tembok Kg 42,000.00
3 Plamir Tembok Kg 27,500.00
4 Minyak bekisting Ltr 8,400.00
C ALAT
1 Sewa Concrete Mixer Hari 250,000.00
1 Cangkul Bh 70,000.00
2 Sikop Bh 75,000.00
3 Meteran bh 30,000.00
4 Gerobak Dorong Bh 370,000.00
5 Palu Bh 50,000.00
6 Keranjang Bh 20,000.00
7 Sekop bh 75,000.00
8 Benang glg 5,000.00
9 Ember BH 7,500.00
Keterangan
1.340,00/Zak
Setera Matex
Harga satuan
No Matarial / Upah JUMLAH Satuan Jumlah Harga
( Rp )
I PLANK NAMA KEGIATAN Rp 250,000.00
II UPAH
1 Pekerja 203.00 HOK Rp 95,000.00 Rp 19,285,000.00
2 Tukang batu 29.00 HOK Rp 115,000.00 Rp 3,335,000.00
II BAHAN
1 Kayu 5/7 16.000 btg Rp 22,000.00 Rp 352,000.00
2 Kayu Papan Bekisting 0.559 M3 Rp 1,700,000.00 Rp 949,000.00
3 Koral Beton 67.00 M3 Rp 250,000.00 Rp 16,750,000.00
4 Minyak bekisting 5.00 Lt Rp 8,400.00 Rp 42,000.00
5 Paku biasa 2"-5" 17.00 Kg Rp 18,000.00 Rp 306,000.00
6 Pasir Beton 47.00 M3 Rp 165,000.00 Rp 7,755,000.00
7 Pasir Urug 43.00 M3 Rp 78,000.00 Rp 3,354,000.00
8 Semen Pc ( 50 Kg) 620.00 Zak Rp 67,000.00 Rp 41,540,000.00
IV ALAT
1 Benang 1.00 glg Rp 21,000.00 Rp 21,000.00
2 Keranjang 3.00 bh Rp 25,000.00 Rp 75,000.00
3 Molen kap 0,3 m3 17.00 Hari Rp 250,000.00 Rp 4,250,000.00
4 Dolak Ukur Adukan 3.00 bh Rp 150,000.00 Rp 450,000.00
5 Ember Cor 5.00 bh Rp 16,000.00 Rp 80,000.00
OP kegiatan = 6% DARI PAGU DANA Rp 6,306,000.00
TOTAL DANA Rp 105,100,000.00
PERHITUNGAN VOLUME
Pekerjaan : Pembangunan Jalan Rigit Beton
Lokasi : Jorong Sinamar
Nagari : Sinamar
Kecamatan : Asam Jujuhan
Tahun : 2020
No Uraian