Anda di halaman 1dari 23

TABEL VI.

ANALISA HARGA SATUAN (AHS) PEKERJAAN KUSEN PINTU DAN DAUN

Harga Sat. Jumlah Harga Jumlah Harga


No. Uraian Jenis pekerjaan Sat. Koeff. Bahan / Upah / Alat Bahan Upah Alat Bahan + Upah
Rp. Rp. Rp. Rp. Rp.
1 2 3 4 5 6 7 8 9
VI PEKERJAAN KUSEN
VI.1 1M3 KUSEN KAYU KAMPER SAMARINDA
Kayu Balok Kamper Samarinda M3 1.1000 Rp8,200,000.00 Rp9,020,000.00 - -
Paku 10 cm Kg 1.2500 Rp16,300.00 Rp20,375.00 - -
Lem Putih (FOX) Kg 1.0000 Rp33,000.00 Rp33,000.00 - -
Pekerja Oh 7.0000 Rp38,000.00 - Rp266,000.00 -
Tukang Kayu Oh 21.0000 Rp50,000.00 - Rp1,050,000.00 -
Kepala Tukang Kayu Oh 2.1000 Rp54,000.00 - Rp113,400.00 -
Mandor Oh 0.3500 Rp60,000.00 - Rp21,000.00 -
Jumlah Rp9,073,375.00 Rp1,450,400.00 Rp0.00 Rp10,523,775.00
VI.2 1M2 DAUN PINTU PANIL TEAKWOOD RANGKA KAYU BANJAR
Rangka Papan Kayu Banjar M3 0.0256 Rp7,200,000.00 Rp184,320.00 - -
Teakwood 4 mm Untuk Pintu (90x220 cm) lbr 1.0000 Rp70,000.00 Rp70,000.00 - -
Lem Putih (FOX) Kg 0.5000 Rp33,000.00 Rp16,500.00 -
Paku Triplek (1-2,5 cm) Kg 0.0300 Rp21,000.00 Rp630.00 - -
Pekerja Oh 0.8000 Rp38,000.00 - Rp30,400.00 -
Tukang Kayu Oh 2.4000 Rp50,000.00 Rp120,000.00
Kepala Tukang Kayu Oh 0.2400 Rp54,000.00 Rp12,960.00
Mandor Oh 0.0400 Rp60,000.00 - Rp2,400.00 -
Jumlah Rp271,450.00 Rp165,760.00 Rp0.00 Rp437,210.00
VI.3 1 M2 PASANGAN KACA POLOS 5 MM
Kaca Polos 5 mm M2 1.000 Rp75,000.00 Rp75,000.00 - -
Paku Kg 0.100 Rp15,000.00 Rp1,500.00 - -
Pekerja Oh 0.150 Rp38,000.00 - Rp5,700.00 -
Tukang Kayu Oh 0.100 Rp50,000.00 - Rp5,000.00 -
Mandor Oh 0.010 Rp60,000.00 - Rp600.00 -
Jumlah Rp76,500.00 Rp11,300.00 Rp0.00 Rp87,800.00
TABEL VI.2
RAB PEKERJAAN KUSEN PINTU DAN DAUN

RAB BAHAN PEKERJAAN KUSEN PINTU DAN DAUN

HARGA SAT JUMLAH HARGA


NO URAIAN PEKERJAAN VOL SAT
BAHAN Biaya Bahan Bid Price Biaya Bahan Pelaksanaan
1 2 3 4 5 6 7
F. PEKERJAAN KUSEN PINTU DAN DAUN
F.1 Pekerjaan Kusen Pintu dan Jendela 1.062 m3 Rp9,073,375 Rp9,635,924.25 Rp9,635,924.25
F.2 Pekerjaan Daun Pintu dan Jendela 17.53 m2 Rp271,450 Rp4,758,518.50 Rp4,758,518.50
F.3 Pasangan Kaca Polos 5 mm 16.81 m2 Rp76,500 Rp1,285,965.00 Rp1,285,965.00
Jumlah Rp15,680,408 Rp15,680,408

RAB UPAH PEKERJAAN KUSEN PINTU DAN DAUN

HARGA SAT JUMLAH HARGA


NO URAIAN PEKERJAAN VOL SAT
UPAH Biaya Upah Bid Price Biaya Upah Pelaksanaan
1 2 3 4 5 6 7
F. PEKERJAAN KUSEN PINTU DAN DAUN
F.1 Pekerjaan Kusen Pintu dan Jendela 1.062 m3 Rp1,450,400 Rp1,540,324.80 Rp1,386,292.32
F.2 Pekerjaan Daun Pintu dan Jendela 17.53 m2 Rp165,760 Rp2,905,772.80 Rp2,615,195.52
F.3 Pasangan Kaca Polos 5 mm 16.81 m2 Rp11,300 Rp189,953.00 Rp170,957.70
Jumlah Rp4,636,051 Rp4,172,446
TABEL VI.3

KEBUTUHAN TENAGA KERJA

Koeff. Koeff.
No. Uraian Jenis pekerjaan Sat. Volume Sat Kebutuhan Tenaga Kerja
(Awal) (Akhir)

1 2 3 4 5 6 7 8=5x6
VI PEKERJAAN KUSEN DAN DAUN
VI.1 PEKERJAAN KUSEN PINTU DAN JENDELA
Pekerja Oh 7.0000 6.3000 1.062 m3 6.6906
Tukang Kayu Oh 21.0000 18.9000 1.062 m3 20.0718
Kepala Tukang Kayu Oh 2.1000 1.8900 1.062 m 3
2.00718
Mandor Oh 0.3500 0.3150 1.062 m3 0.33453
Jumlah 29.10411
VI.2 PEKERJAAN DAUN PINTU DAN JENDELA
Pekerja Oh 0.8000 0.7200 17.53 m2 12.6216
Tukang Kayu Oh 2.4000 2.1600 17.53 m 2
37.8648
Kepala Tukang Kayu Oh 0.2400 0.2160 17.53 m2 3.78648
Mandor Oh 0.0400 0.0360 17.53 m 2
0.63108
Jumlah 54.90396
VI.3 PASANGAN KACA POLOS 5MM
Pekerja Oh 0.1500 0.1350 16.81 m2 2.26935
Tukang Kayu Oh 0.1000 0.0900 16.81 m2 1.5129
Mandor Oh 0.0100 0.0090 16.81 m2 0.15129
Jumlah 3.93354
TABEL VI.4

ANALISIS PRODUKTIVITAS KERJA

Kebutuhan Tenaga Harga Satuan Durasi Volume


No. Uraian Pekerja Sat Biaya Upah Sat
Kerja Upah (Hari) Pekerjaan
1 2 3 4 5 6=4x5 7 8 9
VI. PEKERJAAN KUSEN DAN DAUN
VI.1 PEKERJAAN KUSEN PINTU DAN JENDELA
Pekerja Oh 6.6906 Rp38,000 Rp254,243
Tukang Kayu Oh 20.0718 Rp50,000 Rp1,003,590
10 1.062 m3
Kepala Tukang Kayu Oh 2.00718 Rp54,000 Rp108,388
Mandor Oh 0.33453 Rp60,000 Rp20,072
jumlah Rp1,386,292
VI.2 PEKERJAAN DAUN PINTU DAN JENDELA
Pekerja Oh 12.6216 Rp38,000 Rp479,621
Tukang Kayu Oh 37.8648 Rp50,000 Rp1,893,240
7 17.53 m2
Kepala Tukang Kayu Oh 3.78648 Rp54,000 Rp204,470
Mandor Oh 0.63108 Rp60,000 Rp37,865
Jumlah Rp2,615,196
VI. PASANGAN KACA POLOS 5MM
Pekerja Oh 2.26935 Rp38,000 Rp86,235
Tukang Kayu Oh 1.5129 Rp50,000 Rp75,645 4 16.81 m2
Mandor Oh 0.15129 Rp60,000 Rp9,077
Jumlah Rp170,958
TABEL VI.4

ANALISIS PRODUKTIVITAS KERJA

Kebutuhan Tenaga Kerja Produktivitas Kerja Sat


(Per Hari) (Per Hari)
10 = 4 ÷ 7 11 = 8 ÷ 10 12

0.669
2.007
0.1062 m3
0.201
0.033

1.803
5.409
2.5042857143 m2
0.541
0.090

0.567
0.378 4.2025 m2
0.038
TABEL VI.5

ANALISIS BAHAN DAN KEBUTUHAN BAHAN

Harga Satuan
No. Uraian Jenis pekerjaan Sat. Koeff. Volume Sat Kebutuhan Bahan Sat RAB Bahan
Bahan

1 2 3 4 5 6 7=5x4 7 8 9
V PEKERJAAN KUSEN DAN DAUN
VI.1 PEKERJAAN KUSEN PINTU DAN JENDELA
Kayu Balok Kamper Samarinda M3 1.1 1.06 m3 1.1682 M3 Rp8,200,000 Rp9,579,240
Paku 10 cm Kg 1.25 1.06 m2 1.3275 Kg Rp16,300 Rp21,638
Lem Putih (FOX) Kg 1 1.06 m2 1.062 Kg Rp33,000 Rp35,046
Jumlah Rp9,635,924
VI.2 PEKERJAAN DAUN PINTU DAN JENDELA
Rangka Papan Kayu Banjar M3 0.0256 17.53 m2 0.448768 M3 Rp7,200,000 Rp3,231,130
Teakwood 4 mm Untuk Pintu (90x220 cm) lbr 1.0000 17.53 m2 17.53 lbr Rp70,000 Rp1,227,100
Lem Putih (FOX) Kg 0.5000 17.53 m2 8.765 Kg Rp33,000 Rp289,245
Paku Triplek (1-2,5 cm) Kg 0.0300 17.53 m2 0.5259 Kg Rp21,000 Rp11,044
Jumlah Rp4,758,519
VI.3 PASANGAN KACA POLOS 5MM
Kaca Polos 5 mm M2 1.0000 16.81 M2 16.81 M2 Rp75,000 Rp1,260,750
Paku Kg 0.1000 16.81 Kg 1.681 Kg Rp15,000 Rp25,215
Jumlah Rp1,285,965
TABEL VI.5

BAHAN DAN KEBUTUHAN BAHAN

Durasi Kebutuhan Produktivitas/


Sat Sat
(Hari) Bahan/Hari Hari

10 11 12 13 14

0.11682 M3
10 0.13275 Kg 0.11 m³
0.1062 Kg

0.064109714 M3
2.504285714 lbr
7 2.50 m2
1.252142857 Kg
0.075128571 Kg

4.2025 M2
4 4.20 m2
4 4.20 m2
0.42025 Kg
TABEL VI.6
REKAPITULASI

REKAPITULASI UPAH TENAGA KERJA PEKERJAAN KUSEN DAN DAUN

No. Jenis Pekerja Sat Jumlah Pekerja Sat Harga Satuan RAB Upah Jumlah
Upah Pekerja/Hari
1 Pekerja Oh 21.582 Oh Rp38,000 Rp820,099 1.028
2 Tukang Kayu Oh 59.450 Oh Rp50,000 Rp2,972,475 2.831
3 Kepala Tukang Kayu Oh 5.794 Oh Rp54,000 Rp312,858 0.276
4 Mandor Oh 1.117 Oh Rp60,000 Rp67,014 0.053
Jumlah Rp4,172,446 Jumlah

REKAPITULASI BAHAN PEKERJAAN KUSEN DAN DAUN

No. Jenis Bahan Sat Jumlah Bahan Sat Harga Satuan RAB Bahan Jumlah
Bahan Bahan/Hari
1 Kayu Balok Kamper Samarinda M3 1.168 M3 Rp8,200,000 Rp9,579,240 0.056
2 Paku 10 cm Kg 1.328 Kg Rp16,300 Rp21,638 0.063
3 Lem Putih (FOX) Kg 9.827 Kg Rp33,000 Rp324,291 0.468
4 Rangka Papan Kayu Banjar M3 0.448768 M3 Rp7,200,000 Rp3,231,130 0.021
5 Teakwood 4 mm Untuk Pintu (90x220 cm) lbr 17.53 lbr Rp70,000 Rp1,227,100 0.835
6 Paku Triplek (1-2,5 cm) Kg 0.5259 Kg Rp21,000 Rp11,044 0.025
7 Kaca Polos 5 mm M2 16.81 M2 Rp75,000 Rp1,260,750 0.800
8 Paku Kg 1.681 Kg Rp15,000 Rp25,215 0.080
Jumlah Rp15,680,408 Jumlah
Biaya
Upah/Hari
Rp39,052
Rp141,546
Rp14,898
Rp3,191
Rp198,688

Biaya
Bahan/Hari
Rp456,154
Rp1,030
Rp15,442
Rp153,863
Rp58,433
Rp526
Rp60,036
Rp1,201
Rp746,686
RAB BAHAN PEKERJAAN KUSEN PINTU DAN DAUN

HARGA SAT JUMLAH HARGA


NO URAIAN PEKERJAAN VOL SAT
BAHAN Biaya Bahan Bid Price Biaya Bahan Pelaksanaan
1 2 3 4 5 6 7
F. PEKERJAAN KUSEN PINTU DAN DAUN
F.1 Pekerjaan Kusen Pintu dan Jendela 3.626 m3 Rp9,073,375 Rp32,900,057.75 Rp32,900,057.75
F.2 Pekerjaan Daun Pintu dan Jendela 34.77 m2 Rp271,450 Rp9,438,316.50 Rp9,438,316.50
F.3 Pasangan Kaca Polos 5 mm 13.21 m2 Rp76,500 Rp1,010,565.00 Rp1,010,565.00
Jumlah Rp43,348,939 Rp43,348,939

RAB UPAH PEKERJAAN KUSEN PINTU DAN DAUN

HARGA SAT JUMLAH HARGA


NO URAIAN PEKERJAAN VOL SAT
UPAH Biaya Upah Bid Price Biaya Upah Pelaksanaan
1 2 3 4 5 6 7
F. PEKERJAAN KUSEN PINTU DAN DAUN
F.1 Pekerjaan Kusen Pintu dan Jendela 3.626 m3 Rp1,450,400 Rp5,259,150.40 Rp4,733,235.36
F.2 Pekerjaan Daun Pintu dan Jendela 34.77 m2 Rp165,760 Rp5,763,475.20 Rp5,187,127.68
F.3 Pasangan Kaca Polos 5 mm 13.21 m2 Rp11,300 Rp149,273.00 Rp134,345.70
Jumlah Rp11,171,899 Rp10,054,709
REKAPITULASI UPAH TENAGA KERJA PEKERJAAN KUSEN DAN DAUN

Harga Satuan Biaya


No. Jenis Pekerja Sat Jumlah Pekerja Sat RAB Upah
Upah Jumlah Pekerja/Hari Upah/Hari
1 Pekerja Oh 49.662 Oh Rp38,000 Rp1,887,139 7.095 Rp269,591
2 Tukang Kayu Oh 144.824 Oh Rp50,000 Rp7,241,175 20.689 Rp1,034,454
3Kepala Tukang Kayu Oh 14.363 Oh Rp54,000 Rp775,627 2.052 Rp110,804
4 Mandor Oh 2.513 Oh Rp60,000 Rp150,768 0.359 Rp21,538
Jumlah Rp10,054,709 Jumlah Rp1,436,387

REKAPITULASI BAHAN PEKERJAAN KUSEN DAN DAUN


REKAPITULASI BAHAN PEKERJAAN KUSEN DAN DAUN

No. Jenis Bahan Sat Jumlah Bahan Sat Harga Satuan RAB Bahan Biaya
Bahan Jumlah Bahan/Hari Bahan/Hari
1 Kayu Balo M3 3.989 M3 Rp8,200,000 Rp32,706,520 0.570 Rp4,672,360
2 Paku 10 c Kg 4.533 Kg Rp16,300 Rp73,880 0.648 Rp10,554
3 Lem Putih Kg 21.011 Kg Rp33,000 Rp693,363 3.002 Rp99,052
4 Rangka Pap M3 0.890112 M3 Rp7,200,000 Rp6,408,806 0.127 Rp915,544
5 Teakwood lbr 34.77 lbr Rp70,000 Rp2,433,900 4.967 Rp347,700
6 Paku Triple Kg 1.0431 Kg Rp21,000 Rp21,905 0.149 Rp3,129
7 Kaca Polos M2 13.21 M2 Rp75,000 Rp990,750 1.887 Rp141,536
8 Paku Kg 1.321 Kg Rp15,000 Rp19,815 0.189 Rp2,831
Jumlah Rp43,348,939 Jumlah Rp6,192,706
ANALISIS BAHAN DAN KEBUTUHAN BAHAN

Harga Satuan
No.
Uraian Jenis pekerjaan Sat. Koeff. Volume Sat Kebutuhan Bahan Sat Bahan

1 2 3 4 5 6 7=5x4 7 8
V PEKERJAAN KUSEN DAN DAUN
VI.1 PEKERJAAN KUSEN PINTU DAN JENDELA
Kayu Balok M3 1.1 3.63 m3 3.9886 M3 Rp8,200,000
Paku 10 cm Kg 1.25 3.63 m2 4.5325 Kg Rp16,300
Lem Putih ( Kg 1 3.63 m2 3.626 Kg Rp33,000
VI.2 PEKERJAAN DAUN PINTU DAN JENDELA
Rangka Pap M3 0.0256 34.77 m2 0.890112 M3 Rp7,200,000
Teakwood 4 lbr 1.0000 34.77 m2 34.77 lbr Rp70,000
Lem Putih ( Kg 0.5000 34.77 m2 17.385 Kg Rp33,000
Paku Triplek Kg 0.0300 34.77 m2 1.0431 Kg Rp21,000
VI.3 PASANGAN KACA POLOS 5MM
Kaca Polos M2 1.0000 13.21 M2 13.21 M2 Rp75,000
Paku Kg 0.1000 13.21 Kg 1.321 Kg Rp15,000
N DAN KEBUTUHAN BAHAN

RAB Bahan Durasi Kebutuhan Bahan/Hari Sat Produktivitas/ Sat


(Hari) Hari

9 10 11 12 13 14

Rp32,706,520 0.39886 M3
Rp73,880 10 0.45325 Kg 0.36 m³
Rp119,658 0.3626 Kg

Rp6,408,806 0.1271588571 M3
Rp2,433,900 4.9671428571 lbr
7 4.97 m2
Rp573,705 2.4835714286 Kg
Rp21,905 0.1490142857 Kg

Rp990,750 3.3025 M2
4 3.30 m2
Rp19,815 0.33025 Kg
KEBUTUHAN TENAGA KERJA

No. Uraian Jenis pekerjaan Sat. Koeff. (Awal) Koeff. (Akhir) Volume Sat Kebutuhan Tenaga Kerja

1 2 3 4 5 6 7 8=5x6
VI PEKERJAAN KUSEN DAN DAUN
VI.1 PEKERJAAN KUSEN PINTU DAN JENDELA
Pekerja Oh 7.0000 6.3000 3.626 m3 22.8438
Tukang Kayu Oh 21.0000 18.9000 3.626 m3 68.5314
Kepala Tukang Kayu Oh 2.1000 1.8900 3.626 m3 6.85314
Mandor Oh 0.3500 0.3150 3.626 m3 1.14219
Jumlah 99.37053
VI.2 PEKERJAAN DAUN PINTU DAN JENDELA
Pekerja Oh 0.8000 0.7200 34.77 m2 25.0344
Tukang Kayu Oh 2.4000 2.1600 34.77 m2 75.1032
Kepala Tukang Kayu Oh 0.2400 0.2160 34.77 m2 7.51032
Mandor Oh 0.0400 0.0360 34.77 m2 1.25172
Jumlah 108.89964
VI.3 PASANGAN KACA POLOS 5MM
Pekerja Oh 0.1500 0.1350 13.21 m2 1.78335
Tukang Kayu Oh 0.1000 0.0900 13.21 m2 1.1889
Mandor Oh 0.0100 0.0090 13.21 m2 0.11889
Jumlah 3.09114

ANALISIS PRODUKTIVITAS KERJA

Kebutuhan Harga Satuan


No. Uraian Pekerja Sat Biaya Upah Durasi (Hari) Volume Pekerjaan
Tenaga Kerja Upah
1 2 3 4 5 6=4x5 7 8
VI. PEKERJAAN KUSEN DAN DAUN
VI.1 PEKERJAAN KUSEN PINTU DAN JENDELA
Pekerja Oh 22.8438 Rp38,000 Rp868,064
Tukang Kayu Oh 68.5314 Rp50,000 Rp3,426,570
10 3.626
Kepala Tukang Kayu Oh 6.85314 Rp54,000 Rp370,070
Mandor Oh 1.14219 Rp60,000 Rp68,531
VI.2 PEKERJAAN DAUN PINTU DAN JENDELA
Pekerja Oh 25.0344 Rp38,000 Rp951,307
Tukang Kayu Oh 75.1032 Rp50,000 Rp3,755,160
7 34.77
Kepala Tukang Kayu Oh 7.51032 Rp54,000 Rp405,557
Mandor Oh 1.25172 Rp60,000 Rp75,103
VI. PASANGAN KACA POLOS 5MM
Pekerja Oh 1.78335 Rp38,000 Rp67,767
Tukang Kayu Oh 1.1889 Rp50,000 Rp59,445 4 13.21
Mandor Oh 0.11889 Rp60,000 Rp7,133
S PRODUKTIVITAS KERJA
Kebutuhan
Sat Tenaga Kerja Produktivitas Sat
(Per Hari) Kerja (Per Hari)
9 10 = 4 ÷ 7 11 = 8 ÷ 10 12
2.284
6.853
m3 0.3626 m3
0.685
0.114

3.576
10.729
m2 4.9671428571 m2
1.073
0.179

0.446
m2 0.297 3.3025 m2
0.030

Anda mungkin juga menyukai