0)
KEGIATAN : BALAI PRASARANA PERMUKIMAN WILAYAH NTB
PEKERJAAN : PENATAAN KAWASAN PENGEMBANGAN DESTINASI WISATA KWS. MANDALIKA KAB. LOMBOK TENGAH
LOKASI : KAWASAN MANDALIKA KEC. PUJUT KAB. LOMBOK TENGAH
TAHUN ANGGARAN : 2019
Kode Volume Volume Tambah/Kurang Harga Satuan Total Harga Total Harga Tambah/Kurang Keterangan
No. Uraian Sat Keterangan
Analisa Kontrak MC.0 Tambah Kurang Kontrak Kontrak Mc.0 Tambah Kurang (Harga Timpang)
1 SISTEM MANAJEMEN K3 187,875,000 187,875,000
C Pek. Pondasi
1 Lantai Pondasi m3 A.4.1.1.7 2.06 - - 2.06 1,118,581.00 2,300,250 - - - BERKURANG TIDAK TIMPANG
2 Pas. Batu Kosong m3 A.3.2.1.9 8.23 - - 8.23 472,601.70 3,887,433 - - - BERKURANG TIDAK TIMPANG
3 Pas. Batu Kali m3 A.3.2.1.3 18.51 - - 18.51 792,292.50 14,663,433 - - - BERKURANG TIDAK TIMPANG
D Pek. Beton
1 sloof 15/20 K=200 m3 A.4.1.1.29 1.93 - - 1.93 6,471,402.35 12,476,055 - - - BERKURANG TIDAK TIMPANG
2 kolom praktis 13x13 m3 A.4.1.1.30.f 0.63 - - 0.63 9,932,555.08 6,294,757 - - - BERKURANG TIDAK TIMPANG
3 ring balok 15/20 m3 A.4.1.1.31.c 1.54 - - 1.54 7,613,114.20 11,741,706 - - - BERKURANG TIDAK TIMPANG
Kode Volume Volume Tambah/Kurang Harga Satuan Total Harga Total Harga Tambah/Kurang Keterangan
No. Uraian Sat Keterangan
Analisa Kontrak MC.0 Tambah Kurang Kontrak Kontrak Mc.0 Tambah Kurang (Harga Timpang)
4 rabat lantai beton m3 A.4.1.1.5 2.74 - - 2.74 1,061,174.09 2,907,617 - - - BERKURANG TIDAK TIMPANG
E Pek. Pasangan
1 Pemasangan 1m2 dinding batako 1/2 1SP : 2PP m2 A. 4.4.1.1 12.85 - - 12.85 285,096.50 3,664,203 - - - BERKURANG TIDAK TIMPANG
2 Pemasangan 1m2 dinding batako 1/2 1SP : 5PP m2 A. 4.4.1.4 105.45 - - 105.45 259,497.50 27,362,973 - - - BERKURANG TIDAK TIMPANG
3 plesteran 1/2 m2 A.4.4.2.2 25.71 - - 25.71 64,513.62 1,658,323 - - - BERKURANG TIDAK TIMPANG
4 plesteran 1/5 m2 A.4.4.2.5 210.89 - - 210.89 58,593.42 12,356,884 - - - BERKURANG TIDAK TIMPANG
5 acian dinding Trasram m2 A.4.4.2.27 25.71 - - 25.71 35,788.00 919,931 - - - BERKURANG TIDAK TIMPANG
6 Acian Dinding pasangan m2 A.4.4.2.27 134.20 - - 134.20 35,788.00 4,802,893 - - - BERKURANG TIDAK TIMPANG
F Pek. Atap
1 rangka kuda kuda atap 6/12 m3 A.4.6.1.13 0.36 - - 0.36 24,392,805.25 8,851,661 - - - BERKURANG TIDAK TIMPANG
2 nok 6/12 m3 A.4.6.1.13 0.10 - - 0.10 24,392,805.25 2,529,046 - - - BERKURANG TIDAK TIMPANG
3 reng 3/5 m3 A.4.6.1.13 0.21 - - 0.21 24,392,805.25 5,071,264 - - - BERKURANG TIDAK TIMPANG
4 atap alang alang m2 LS 54 50.40 - - 50.40 155,266.51 7,825,432 - - - BERKURANG TIDAK TIMPANG
5 listplank m3 A.4.6.1.22 0.18 - - 0.18 223,887.75 41,016 - - - BERKURANG TIDAK TIMPANG
6 plafond kalsiboard m2 A.4.5.1.5 51.41 - - 51.41 60,892.50 3,130,483 - - - BERKURANG TIDAK TIMPANG
I Pek. Elektrikal
1 Lampu bh LS 15.00 - - 15.00 80,000.00 1,200,000 - - - BERKURANG TIDAK TIMPANG
2 Saklar Tunggal bh LS 5.00 - - 5.00 25,000.00 125,000 - - - BERKURANG TIDAK TIMPANG
J Pek. Kusen
1 Pek. Pasangan kusen kayu m3 A.4.6.1.1 0.26 - - 0.26 22,159,608.75 5,816,897 - - - BERKURANG TIDAK TIMPANG
2 Pek. Pas daun pintu panil m2 A.4.6.1.5 11.76 - - 11.76 1,160,120.00 13,643,011 - - - BERKURANG TIDAK TIMPANG
L Pek. Mechanical
1 Septictank unit Ls 1.00 - - 1.00 2,500,000.00 2,500,000 - - - BERKURANG TIDAK TIMPANG
2 Tower Air + Rangka Baja unit Ls 1.00 - - 1.00 20,000,000.00 20,000,000 - - - BERKURANG TIDAK TIMPANG
3 Pipa PVC AW 3/4" m A.5.1.1.26 35.00 - - 35.00 25,974.59 909,111 - - - BERKURANG TIDAK TIMPANG
4 Pipa PVC AW 1/2" m A.5.1.1.25 55.00 - - 55.00 22,409.59 1,232,527 - - - BERKURANG TIDAK TIMPANG
5 Pipa PVC AW 3" m A.5.1.1.31 40.00 - - 40.00 281,233.77 11,249,351 - - - BERKURANG TIDAK TIMPANG
6 Pipa PVC AW 4" m A.5.1.1.32 40.00 - - 40.00 296,206.77 11,848,271 - - - BERKURANG TIDAK TIMPANG
7 Urinoir unit A.5.1.1.4 3.00 - - 3.00 2,504,872.50 7,514,618 - - - BERKURANG TIDAK TIMPANG
8 Closed duduk unit A.5.1.1.2a 6.00 - - 6.00 3,875,787.50 23,254,725 - - - BERKURANG TIDAK TIMPANG
9 Floor Drain unit A.5.1.1.14 11.00 - - 11.00 32,695.65 359,652 - - - BERKURANG TIDAK TIMPANG
10 Kran air dia. 1/2" bh A.5.1.1.19 6.00 - - 6.00 124,158.03 744,948 - - - BERKURANG TIDAK TIMPANG
11 Shower unit A.5.1.1.6 2.00 - - 2.00 4,839,625.50 9,679,251 - - - BERKURANG TIDAK TIMPANG
12 Kaca Cermin bh Ls 5.00 - - 5.00 250,000.00 1,250,000 - - - BERKURANG TIDAK TIMPANG
13 Wastafel unit A.5.1.1.5 6.00 - - 6.00 3,249,506.70 19,497,040 - - - BERKURANG TIDAK TIMPANG