Anda di halaman 1dari 106

REKAPITULASI

KEGIATAN : REHABILITASI DAN RENOVASI SARANA PRASARANA SEKOLAH


PEKERJAAN : REHABILITASI DAN RENOVASI SARANA PRASARANA SEKOLAH SD INPRES NAMAA
LOKASI : SD INPRES NAMAA
TAHUN ANGGARAN : 2019

NO. URAIAN JUMLAH HARGA (Rp.)

I PEKERJAAN PEMBONGKARAN 623,249,184.78


II REHABILITASI RUANG KEPSEK + RUANG GURU 309,679,243.60
III REHABILITASI PERPUSTAKAAN + 1 RUANG KELAS 312,413,194.72
IV REHABILITASI TOILET SEKOLAH 18,539,217.82
V PAGAR SEKOLAH 1,112,940,895.36
VI MENARA AIR 49,913,493.89
VII SALURAN KELILING 160,619,062.59
VIII TAMAN 35,374,659.86
IX LAPANGAN UPACARA 262,827,558.00
X GASEBO 41,411,400.58
XI PEKERJAAN AKHIR 8,000,000.00
XII PEKERJAAN PENGADAAN K3 30,275,000.00

JUMLAH 2,965,242,911.20
PPN 10 % 296,524,291.12
TOTAL JUMLAH 3,261,767,202.32
DIBULATKAN 3,261,767,000.00

TERBILANG : TIGA MILYAR DUA RATUS ENAM PULUH SATU JUTA TUJUH RATUS ENAM PULUH TUJUH RIBU RUPIAH,-
HARGA SATUAN JUMLAH HARGA
No. URAIAN PEKERJAAN VOLUME SATUAN
(Rp.) (Rp.)

A BANGUN 1 RUANG KELAS BELAJAR


I PEKERJAAN PERSIAPAN
1 Pengukuran dan pemasangan bouwplank 1.00 Ls 500,000.00 500,000.00
2 Pekerjaan Pembongkaran pembersihan Lokasi Pekerjaan 1.00 Ls 1,500,000.00 1,500,000.00
TOTAL 2,000,000.00
II PEKERJAAN TANAH
1 Galian Tanah Pondasi 33.60 M3 103,812.00 3,488,083.20
2 Urugan Tanah Kembali (Ex galian) 10.29 M3 37,812.00 389,085.48
3 Urugan Pasir Bawah Pondasi 3.36 M3 576,125.00 1,935,780.00
4 Urug Pasir di bawah Lantai 22.40 M3 576,125.00 12,905,200.00
TOTAL 18,718,148.68
III PEKERJAAN PASANGAN
1 Pasangan pondasi batu kali 1: 4 13.23 M3 1,420,457.00 18,792,646.11
2 Pasangan batu kosong (anstamping) 6.72 M3 915,073.00 6,149,290.56
3 Pasangan dinding batu bata camp. 1 : 4 116.45 M2 440,055.00 51,245,944.94
TOTAL 76,187,881.61
IV PEKERJAAN PLESTERAN
1 Plesteran dinding camp. 1 : 4 232.91 M2 89,598.00 20,868,001.39
2 Pekerjaan Acian Dinding 232.91 M2 50,902.00 11,855,432.11
TOTAL 32,723,433.50
V PEKERJAAN BETON
1 Sloof Beton utama 15/20 (326 kg/m3) 1.86 M3 #NAME? #NAME?
2 Kolom Beton Utama 15/20 (200 kg/m3) 1.19 M3 #NAME? #NAME?
3 Kolom Praktis 15/15 (46.78 kg/m3) 0.27 M3 #NAME? #NAME?
4 Balok 15/20 (326 kg/m3) 1.64 M3 #NAME? #NAME?
TOTAL #NAME?
V PEKERJAAN ATAP DAN PLAFON
1 Kuda-Kuda Kayu Klls 1 (6/12 cm ) 0.89 M3 8,683,647.00 7,728,445.83
2 Gording Kayu Kls II Uk. 5/10 0.88 M3 8,335,937.00 7,335,624.56
3 Atap Zink Gelombang BJLS 0,25 101.70 M2 124,047.00 12,615,579.90
4 Bumbungan Atap Zenk Plat BJLS 0,28 9.00 M1 58,751.00 528,759.00
5 Rangka Plafon Kayu Kls II 54.59 M3 130,009.00 7,097,191.31
6 Plafon Tripleks 3 mm 109.17 M2 99,500.00 10,862,415.00
7 List Plafon Kayu 50.00 M1 79,211.00 3,960,550.00
8 Balok Bumbungan Kayu Kls II 9.00 M1 124,047.00 1,116,423.00
9 Papan Lisplank Doubel Kayu Kls I 30.00 M1 132,907.00 3,987,210.00
TOTAL 55,232,198.60
VI PEKERJAAN LANTAI DAN KERAMIK
1 Rabat beton 1:3:5 t = 5 cm 2.65 M3 1,390,622.00 3,684,279.16
2 Lantai tegel keramik 30/30 cm 52.99 M2 237,109.00 12,563,813.14
3 Plint Tegel dalam Ruangan 3.60 M1 443,715.00 1,597,374.00
4 Lantai keramik 30x30 cm (teras) 17.07 M2 237,109.00 4,048,339.79
TOTAL 21,893,806.09
VII PEKERJAAN PINTU DAN JENDELA
1 Kusen pintu, jendela, ventilasi kayu kls I 1.54 M3 13,052,187.00 20,100,367.98
2 Daun pintu panel kayu kls I 1.40 M3 991,375.00 1,387,925.00
3 Daun jendela kaca 4 mm bingkai kayu kls I 6.38 M2 722,150.00 4,610,205.60
4 Engsel jendela 24.00 Bh 53,666.00 1,287,984.00
5 Engsel pintu 4.00 Bh 71,434.00 285,736.00
6 Grandel jendela 12.00 Bh 76,546.00 918,552.00
7 Grandel pintu 1.00 Bh 82,046.00 82,046.00
8 Kunci pintu 2 slaag 1.00 Bh 492,497.00 492,497.00
9 Grendel tanam pintu 1.00 Bh 82,046.00 82,046.00
TOTAL 29,247,359.58
VIII PEKERJAAN CAT
1 Cat dinding Baru 232.91 M2 56,952.00 13,264,519.46
2 Cat plafond 70.06 M2 56,952.00 3,990,128.31
3 Pengecatan Kosen Pintu/Jendela/Vetilasi 3.08 M2 66,154.00 203,754.32
TOTAL 17,458,402.09
IX PEKERJAAN INSTALASI LISTRIK
1 Instalasi listrik 4.00 Titik 1,178,543.00 4,714,172.00
2 Stop kontak merk brocco 2.00 Bh 95,000.00 190,000.00
3 MCB komplit 1.00 Unit 350,000.00 350,000.00
4 Lampu TL Bulat 23 watt 4.00 Unit 245,000.00 980,000.00
5 Lampu philps 23 watt 2.00 Bh 175,000.00 350,000.00
TOTAL 6,584,172.00
B BANGUN 3 RUANG KELAS BELAJAR
I PEKERJAAN PERSIAPAN
1 Pengukuran dan pemasangan bouwplank 1.00 Ls 500,000.00 500,000.00
2 Pekerjaan Pembongkaran pembersihan Lokasi Pekerjaan 1.00 Ls 1,500,000.00 1,500,000.00
TOTAL 2,000,000.00
II PEKERJAAN TANAH
1 Galian Tanah Pondasi 86.40 M3 103,812.00 8,969,356.80
2 Urugan Tanah Kembali (Ex galian) 26.46 M3 37,812.00 1,000,505.52
3 Urugan Pasir Bawah Pondasi 8.64 M3 576,125.00 4,977,720.00
4 Urug Pasir di bawah Lantai 67.20 M3 576,125.00 38,715,600.00
TOTAL 53,663,182.32
III PEKERJAAN PASANGAN
1 Pasangan pondasi batu kali 1: 4 34.02 M3 1,420,457.00 48,323,947.14
2 Pasangan batu kosong (anstamping) 17.28 M3 915,073.00 15,812,461.44
3 Pasangan dinding batu bata camp. 1 : 4 206.21 M2 440,055.00 90,743,653.54
TOTAL 154,880,062.12
IV PEKERJAAN PLESTERAN
1 Plesteran dinding camp. 1 : 4 412.42 M2 89,598.00 36,951,971.32
2 Pekerjaan Acian Dinding 412.42 M2 50,902.00 20,992,982.48
TOTAL 57,944,953.80
V PEKERJAAN BETON
1 Sloof Beton utama 15/20 (326 kg/m3) 4.76 M3 #NAME? #NAME?
2 Kolom Beton Utama 15/20 (200 kg/m3) 2.89 M3 #NAME? #NAME?
3 Kolom Praktis 15/15 (46.78 kg/m3) 0.51 M3 #NAME? #NAME?
4 Balok 15/20 (326 kg/m3) 3.50 M3 #NAME? #NAME?
TOTAL #NAME?
V PEKERJAAN ATAP DAN PLAFON
1 Kuda-Kuda Kayu Klls 1 (6/12 cm ) 2.00 M3 8,683,647.00 17,367,294.00
2 Gording Kayu Kls II Uk. 5/10 2.20 M3 8,335,937.00 18,339,061.40
3 Atap Zink Gelombang BJLS 0,25 245.00 M2 124,047.00 30,391,515.00
4 Bumbungan Atap Zenk Plat BJLS 0,28 26.60 M1 58,751.00 1,562,776.60
5 Rangka Plafon Kayu Kls II 141.27 M3 130,009.00 18,366,371.43
6 Plafon Tripleks 3 mm 282.54 M2 99,500.00 28,112,730.00
7 List Plafon Kayu 75.00 M1 79,211.00 5,940,825.00
8 Balok Bumbungan Kayu Kls II 26.60 M1 124,047.00 3,299,650.20
9 Papan Lisplank Doubel Kayu Kls I 78.60 M1 132,907.00 10,446,490.20
TOTAL 133,826,713.83
VI PEKERJAAN LANTAI DAN KERAMIK
1 Rabat beton 1:3:5 t = 5 cm 7.95 M3 1,390,622.00 11,052,837.48
2 Lantai tegel keramik 30/30 cm 158.96 M2 237,109.00 37,691,439.41
3 Plint Tegel dalam Ruangan 10.48 M1 443,715.00 4,648,358.34
4 Lantai keramik 30x30 cm (teras) 52.20 M2 237,109.00 12,377,089.80
TOTAL 65,769,725.04
VII PEKERJAAN PINTU DAN JENDELA
1 Kusen pintu, jendela, ventilasi kayu kls I 1.54 M3 13,052,187.00 20,100,367.98
2 Daun pintu panel kayu kls I 4.20 M3 991,375.00 4,163,775.00
3 Daun jendela kaca 4 mm bingkai kayu kls I 92.16 M2 722,150.00 66,553,344.00
4 Engsel jendela 24.00 Bh 53,666.00 1,287,984.00
5 Engsel pintu 6.00 Bh 71,434.00 428,604.00
6 Grandel jendela 12.00 Bh 76,546.00 918,552.00
7 Grandel pintu 3.00 Bh 82,046.00 246,138.00
8 Kunci pintu 2 slaag 3.00 Bh 492,497.00 1,477,491.00
9 Grendel tanam pintu 3.00 Bh 82,046.00 246,138.00
TOTAL 95,422,393.98
VIII PEKERJAAN CAT
1 Cat dinding 412.42 M2 56,952.00 23,488,121.06
2 Cat plafond 211.16 M2 56,952.00 12,026,126.70
3 Pengecatan Kosen Pintu/Jendela/Vetilasi 3.08 M2 66,154.00 203,754.32
TOTAL 35,718,002.08
IX PEKERJAAN INSTALASI LISTRIK
1 Instalasi listrik 12.00 Titik 1,178,543.00 14,142,516.00
2 Stop kontak merk brocco 6.00 Bh 95,000.00 570,000.00
3 MCB komplit 1.00 Unit 350,000.00 350,000.00
4 Lampu TL Bulat 23 watt 12.00 Unit 245,000.00 2,940,000.00
5 Lampu philps 23 watt 6.00 #REF! 175,000.00 1,050,000.00
TOTAL 19,052,516.00
C BANGUN RUANG WC
I PEKERJAAN PERSIAPAN
1 Pengukuran dan pemasangan bouwplank 1.00 Ls 500,000.00 500,000.00
2 Pekerjaan Pembongkaran pembersihan Lokasi Pekerjaan 1.00 Ls 1,500,000.00 1,500,000.00
TOTAL 2,000,000.00
II PEKERJAAN TANAH
1 Galian Tanah Pondasi 28.80 M3 103,812.00 2,989,785.60
2 Urugan Tanah Kembali (Ex galian) 8.82 M3 37,812.00 333,501.84
3 Urugan Pasir Bawah Pondasi 2.88 M3 576,125.00 1,659,240.00
4 Urug Pasir di bawah Lantai 5.40 M3 576,125.00 3,111,075.00
TOTAL 8,093,602.44
III PEKERJAAN PASANGAN
1 Pasangan pondasi batu kali 1: 4 9.45 M3 1,420,457.00 13,423,318.65
2 Pasangan batu kosong (anstamping) 7.20 M3 915,073.00 6,588,525.60
3 Pasangan dinding batu bata camp. 1 : 4 101.57 M2 440,055.00 44,697,266.46
TOTAL 64,709,110.71
IV PEKERJAAN PLESTERAN
1 Plesteran dinding camp. 1 : 4 203.14 M2 89,598.00 18,201,296.11
2 Pekerjaan Acian Dinding 203.14 M2 50,902.00 10,340,435.89
TOTAL 28,541,732.00
V PEKERJAAN BETON
1 Sloof Beton utama 15/20 (326 kg/m3) 1.08 M3 #NAME? #NAME?
2 Kolom Beton Utama 15/20 (200 kg/m3) 1.02 M3 #NAME? #NAME?
3 Kolom Praktis 15/15 (46.78 kg/m3) 0.27 M3 #NAME? #NAME?
4 Balok 15/20 (326 kg/m3) 1.08 M3 #NAME? #NAME?
TOTAL #NAME?
V PEKERJAAN ATAP DAN PLAFON
1 Kuda-Kuda Kayu Klls 1 (6/12 cm ) 0.54 M3 8,683,647.00 4,689,169.38
2 Gording Kayu Kls II Uk. 5/10 0.54 M3 8,335,937.00 4,501,405.98
3 Atap Zink Gelombang BJLS 0,25 30.00 M2 124,047.00 3,721,410.00
4 Bumbungan Atap Zenk Plat BJLS 0,28 8.00 M1 58,751.00 470,008.00
5 Rangka Plafon Kayu Kls II 26.10 M3 130,009.00 3,393,234.90
6 Plafon Tripleks 3 mm 52.20 M2 99,500.00 5,193,900.00
7 List Plafon Kayu 25.00 M1 79,211.00 1,980,275.00
8 Balok Bumbungan Kayu Kls II 8.00 M1 124,047.00 992,376.00
9 Papan Lisplank Doubel Kayu Kls I 15.00 M1 132,907.00 1,993,605.00
TOTAL 26,935,384.26
VI PEKERJAAN LANTAI DAN KERAMIK
1 Rabat beton 1:3:5 t = 5 cm 1.64 M3 1,390,622.00 2,277,143.53
2 Lantai tegel keramik 30/30 cm 32.75 M2 237,109.00 7,765,319.75
3 Plint Tegel dalam Ruangan 3.60 M1 443,715.00 1,597,374.00
4 Lantai keramik 30x30 cm (teras) 4.50 M2 237,109.00 1,066,990.50
TOTAL 12,706,827.78
VII PEKERJAAN PINTU DAN JENDELA
1 Kusen pintu, jendela, ventilasi kayu kls I 0.73 M3 13,052,187.00 9,528,096.51
2 Daun pintu panel kayu kls I 2.80 M3 991,375.00 2,775,850.00
3 Engsel pintu 6.00 Bh 722,150.00 4,332,900.00
4 Grandel pintu 1.00 Bh 53,666.00 53,666.00
5 Kunci pintu 2 slaag 1.00 Bh 71,434.00 71,434.00
6 Grendel tanam pintu 1.00 Bh 76,546.00 76,546.00
TOTAL 16,838,492.51
VIII PEKERJAAN CAT
1 Cat dinding 203.14 M2 56,952.00 11,569,457.09
2 Cat plafond 32.75 M2 56,952.00 1,865,178.00
3 Pengecatan Kosen Pintu/Jendela/Vetilasi 1.46 M2 66,154.00 96,584.84
TOTAL 13,531,219.93
IX PEKERJAAN INSTALASI LISTRIK
1 Instalasi listrik 6.00 Titik 1,178,543.00 7,071,258.00
2 Stop kontak merk brocco 4.00 Bh 95,000.00 380,000.00
3 MCB komplit 1.00 Unit 350,000.00 350,000.00
4 Lampu TL Bulat 23 watt 4.00 Unit 245,000.00 980,000.00
5 Lampu philps 23 watt 2.00 #REF! 175,000.00 350,000.00
TOTAL 9,131,258.00
D BANGUN RUANG KEPALA SEKOLAH
I PEKERJAAN PERSIAPAN
1 Pengukuran dan pemasangan bouwplank 1.00 Ls 500,000.00 500,000.00
2 Pekerjaan Pembongkaran pembersihan Lokasi Pekerjaan 1.00 Ls 1,500,000.00 1,500,000.00
TOTAL 2,000,000.00
I PEKERJAAN TANAH
1 Galian Tanah Pondasi 24.00 M3 103,812.00 2,491,488.00
2 Urugan Tanah Kembali (Ex galian) 7.35 M3 37,812.00 277,918.20
3 Urugan Pasir Bawah Pondasi 2.40 M3 576,125.00 1,382,700.00
4 Urugan Pasir Bawah Lantai 14.40 M3 576,125.00 8,296,200.00
TOTAL 12,448,306.20
II PEKERJAAN PASANGAN
1 Pasangan pondasi batu kali 1: 4 9.45 M3 1,420,457.00 13,423,318.65
2 Pasangan batu kosong (anstamping) 4.80 M3 37,812.00 181,497.60
3 Pasangan dinding batu bata camp. 1 : 4 96.52 M2 440,055.00 42,474,108.60
TOTAL 56,078,924.85
III PEKERJAAN PLESTERAN
1 Plesteran dinding camp. 1 : 4 193.04 M2 89,598.00 17,295,997.92
2 Pekerjaan Acian Dinding 193.04 M2 50,902.00 9,826,122.08
TOTAL 27,122,120.00
IV PEKERJAAN BETON
1 Sloof Beton utama 15/20 (326 kg/m3) 1.50 M3 #NAME? #NAME?
2 Kolom Beton Utama 15/20 (200 kg/m3) 1.19 M3 #NAME? #NAME?
3 Kolom Praktis 15/15 (46.78 kg/m3) 0.23 M3 #NAME? #NAME?
4 Balok 15/20 (326 kg/m3) 1.50 M3 #NAME? #NAME?
TOTAL #NAME?
V PEKERJAAN ATAP DAN PLAFON
1 Kuda-kuda kayu Kls 1 6/12 cm 0.89 M3 8,683,647.00 7,728,445.83
2 Gording kayu Kls II ukuran 5/10 cm 0.88 M3 8,335,937.00 7,335,624.56
3 Atap Zink Gelombang BJLS 0.25 101.70 M1 124,047.00 12,615,579.90
4 Bumbungan Atap zink Plat BJLS 0.28 9.00 M1 58,751.00 528,759.00
5 Rangka plafond kayu Kls II 41.40 M3 130,009.00 5,382,372.60
6 Plafond tripleks 3 mm 82.80 M2 99,500.00 8,238,600.00
7 List plafond kayu 40.00 M1 79,211.00 3,168,440.00
8 Balok bubungan kayu Kls II 9.00 M1 124,047.00 1,116,423.00
9 Papan listplank doubel kayu Kls I 30.00 M1 132,907.00 3,987,210.00
TOTAL 50,101,454.89
VI PEKERJAAN LANTAI DAN KERAMIK
1 Rabat beton 1:3:5 t = 5 cm 2.65 M1 1,390,622.00 3,684,279.16
2 Lantai tegel keramik 30/30 cm 52.99 M2 237,109.00 12,563,813.14
3 Plint Tegel dalam Ruangan 3.60 M' 443,715.00 1,597,374.00
4 Lantai keramik 30x30 cm (teras) 17.07 Ls 237,109.00 4,048,339.79
TOTAL 21,893,806.09
VI PEKERJAAN PINTU DAN JENDELA
1 Kusen pintu, jendela, ventilasi kayu kls I 1.54 m3 13,052,187.00 20,100,367.98
2 Daun pintu panel kayu kls I 1.40 m2 991,375.00 1,387,925.00
3 Daun jendela kaca 4 mm bingkai kayu kls I 6.38 m2 722,150.00 4,610,205.60
4 Engsel jendela 24.00 bh 53,666.00 1,287,984.00
5 Engsel pintu 4.00 bh 71,434.00 285,736.00
6 Grandel jendela 12.00 bh 76,546.00 918,552.00
7 Grandel pintu 1.00 bh 82,046.00 82,046.00
8 Kunci pintu 2 slaag 1.00 bh 492,497.00 492,497.00
9 Grendel tanam pintu 1.00 bh 82,046.00 82,046.00
TOTAL 29,247,359.58
VII PEKERJAAN CAT
1 Cat dinding 193.04 m3 56,952.00 10,994,014.08
2 Cat plafond 70.06 m2 56,952.00 3,990,128.31
3 Pengecatan Kosen Pintu/Jendela/Vetilasi 3.08 m2 66,154.00 203,754.32
TOTAL 15,187,896.71
VIII PEKERJAAN INSTALASI LISTRIK
1 Instalasi listrik 4.00 Ttk 1,178,543.00 4,714,172.00
2 Stop kontak merk brocco 2.00 Ttk 95,000.00 190,000.00
3 MCB komplit 1.00 Bh 350,000.00 350,000.00
4 Lampu TL Bulat 23 watt 4.00 Bh 245,000.00 980,000.00
5 Lampu philps 23 watt 2.00 Bh 175,000.00 350,000.00
TOTAL 6,584,172.00
E BANGUN RUANG LABORATORIUM
I PEKERJAAN PERSIAPAN
1 Pengukuran dan pemasangan bouwplank 1.00 Ls 500,000.00 500,000.00
2 Pekerjaan Pembongkaran pembersihan Lokasi Pekerjaan 1.00 Ls 1,500,000.00 1,500,000.00
TOTAL 2,000,000.00
I PEKERJAAN TANAH
1 Galian Tanah Pondasi 33.60 m3 103,812.00 3,488,083.20
2 Urugan Tanah Kembali (Ex galian) 10.29 m3 37,812.00 389,085.48
3 Urugan Pasir Bawah Pondasi 3.36 m3 576,125.00 1,935,780.00
4 Urugan material urug di bawah Lantai 12.60 m3 576,125.00 7,259,175.00
TOTAL 13,072,123.68
II PEKERJAAN PASANGAN
1 Pasangan pondasi batu kali 1: 4 8.40 m3 1,420,457.00 11,931,838.80
2 Pasangan batu kosong (anstamping) 6.72 m3 915,073.00 6,149,290.56
3 Pasangan dinding batu bata camp. 1 : 4 130.20 m2 440,055.00 57,295,161.00
TOTAL 75,376,290.36
III PEKERJAAN PLESTERAN
1 Plesteran dinding camp. 1 : 4 130.20 m2 89,598.00 11,665,659.60
2 Pekerjaan Acian Dinding 130.20 m2 50,902.00 6,627,440.40
TOTAL 18,293,100.00
IV PEKERJAAN BETON
1 Sloof Beton utama 15/20 (326 kg/m3) 2.10 m3 #NAME? #NAME?
2 Kolom Beton Utama 15/20 (200 kg/m3) 0.61 m3 #NAME? #NAME?
3 Kolom Praktis 15/15 (46.78 kg/m3) 0.27 m3 #NAME? #NAME?
5 Balok 15/20 (326 kg/m3) 2.10 m3 #NAME? #NAME?
TOTAL #NAME?
V PEKERJAAN ATAP DAN PLAFON
1 Kuda-kuda kayu Kls 1 6/12 cm 0.72 m3 8,683,647.00 6,252,225.84
2 Gording kayu Kls II ukuran 5/10 cm 1.51 m3 8,335,937.00 12,587,264.87
3 Atap Zink Gelombang BJLS 0.25 72.00 m2 124,047.00 8,931,384.00
4 Bumbungan Atap zink Plat BJLS 0.28 11.00 m' 58,751.00 646,261.00
5 Rangka plafond kayu Kls II 46.45 m2 130,009.00 6,038,918.05
6 Plafond tripleks 3 mm 92.90 m2 99,500.00 9,243,550.00
7 List plafond kayu 50.00 m' 79,211.00 3,960,550.00
8 Balok bubungan kayu Kls II 11.00 m' 124,047.00 1,364,517.00
9 Papan listplank doubel kayu Kls I 30.00 m' 132,907.00 3,987,210.00
TOTAL 53,011,880.76
VI PEKERJAAN LANTAI DAN KERAMIK
1 Rabat beton 1:3:5 t = 5 cm 2.45 m3 1390622.00 3,407,023.90
2 Lantai tegel keramik 30/30 cm 49.00 m2 237109.00 11,618,341.00
3 Plint Tegel dalam Ruangan 3.36 m1 443715.00 1,490,882.40
4 Lantai keramik 30x30 cm (teras) 17.07 m2 237109.00 4,048,339.79
TOTAL 20,564,587.09
VII PEKERJAAN PINTU DAN JENDELA
1 Kusen pintu, jendela, ventilasi kayu kls I 1.54 m3 13,052,187.00 20,100,367.98
2 Daun pintu panel kayu kls I 1.40 m2 991,375.00 1,387,925.00
3 Daun jendela kaca 4 mm bingkai kayu kls I 6.38 m2 722,150.00 4,610,205.60
4 Engsel jendela 24.00 bh 53,666.00 1,287,984.00
5 Engsel pintu 4.00 bh 71,434.00 285,736.00
6 Grandel jendela 12.00 bh 76,546.00 918,552.00
7 Grandel pintu 1.00 bh 82,046.00 82,046.00
8 Kunci pintu 2 slaag 1.00 bh 492,497.00 492,497.00
9 Grendel tanam pintu 1.00 bh 82,046.00 82,046.00
TOTAL 29,247,359.58
VIII PEKERJAAN CAT
1 Cat dinding 130.20 m2 56,952.00 7,415,150.40
2 Cat plafond 66.07 m2 56,952.00 3,763,032.21
3 Pengecatan Kosen Pintu/Jendela/Vetilasi 3.08 m2 66,154.00 203,754.32
TOTAL 11,381,936.93
X PEKERJAAN INSTALASI LISTRIK
1 Instalasi listrik 4.00 ttk 1,178,543.00 4,714,172.00
2 Stop kontak merk brocco 2.00 bh 95,000.00 190,000.00
3 MCB komplit 1.00 unit 350,000.00 350,000.00
4 Lampu TL Bulat 23 watt 4.00 Unit 245,000.00 980,000.00
5 Lampu philps 23 watt 2.00 bh 175,000.00 350,000.00
TOTAL 6,584,172.00
F BANGUN RUANG UKS & TEMPAT IBADAH
I PEKERJAAN PERSIAPAN
1 Pengukuran dan pemasangan bouwplank 1.00 Ls 500,000.00 500,000.00
2 Pekerjaan Pembongkaran pembersihan Lokasi Pekerjaan 1.00 Ls 1,500,000.00 1,500,000.00
TOTAL 2,000,000.00
I PEKERJAAN TANAH
1 Galian Tanah Pondasi 33.60 m3 103,812.00 3,488,083.20
2 Urugan Tanah Kembali (Ex galian) 10.29 m3 37,812.00 389,085.48
3 Urugan Pasir Bawah Pondasi 3.36 m3 576,125.00 1,935,780.00
4 Urugan material urug di bawah Lantai 22.40 m3 576,125.00 12,905,200.00
TOTAL 18,718,148.68
II PEKERJAAN PASANGAN
1 Pasangan pondasi batu kali 1: 4 13.23 m3 1,420,457.00 18,792,646.11
2 Pasangan batu kosong (anstamping) 6.72 m3 915,073.00 6,149,290.56
3 Pasangan dinding batu bata camp. 1 : 4 116.45 m2 440,055.00 51,245,944.94
TOTAL 76,187,881.61
III PEKERJAAN PLESTERAN
1 Plesteran dinding camp. 1 : 4 232.91 m2 89,598.00 20,868,001.39
2 Pekerjaan Acian Dinding 232.91 m2 50,902.00 11,855,432.11
TOTAL 32,723,433.50
IV PEKERJAAN BETON
1 Sloof Beton utama 15/20 (326 kg/m3) 1.86 m3 #NAME? #NAME?
2 Kolom Beton Utama 15/20 (200 kg/m3) 1.19 m3 #NAME? #NAME?
3 Kolom Praktis 15/15 (46.78 kg/m3) 0.23 m3 #NAME? #NAME?
5 Balok 15/20 (326 kg/m3) 1.64 m3 #NAME? #NAME?
TOTAL #NAME?
V PEKERJAAN ATAP DAN PLAFON
1 Kuda-kuda kayu Kls 1 6/12 cm 8.90 m3 8,683,647.00 77,284,458.30
2 Gording kayu Kls II ukuran 5/10 cm 0.88 m3 8,335,937.00 7,335,624.56
3 Atap Zink Gelombang BJLS 0.25 101.70 m2 124,047.00 12,615,579.90
4 Bumbungan Atap zink Plat BJLS 0.28 9.00 m' 58,751.00 528,759.00
5 Rangka plafond kayu Kls II 46.45 m2 130,009.00 6,038,918.05
6 Plafond tripleks 3 mm 92.90 m2 99,500.00 9,243,550.00
7 List plafond kayu 50.00 m' 79,211.00 3,960,550.00
8 Balok bubungan kayu Kls II 9.00 m' 124,047.00 1,116,423.00
9 Papan listplank doubel kayu Kls I 30.00 m' 132,907.00 3,987,210.00
TOTAL 122,111,072.81
VI PEKERJAAN LANTAI DAN KERAMIK
1 Rabat beton 1:3:5 t = 5 cm 3.21 m3 1390622.00 4,466,677.86
2 Lantai tegel keramik 30/30 cm 64.24 m2 237109.00 15,231,882.16
3 Plint Tegel dalam Ruangan 30.00 m1 443715.00 13,311,450.00
4 Lantai keramik 30x30 cm (teras) 17.07 m2 237109.00 4,048,339.79
TOTAL 37,058,349.81
VII PEKERJAAN PINTU DAN JENDELA
1 Kusen pintu, jendela, ventilasi kayu kls I 1.54 m3 13,052,187.00 20,100,367.98
2 Daun pintu panel kayu kls I 1.40 m2 991,375.00 1,387,925.00
3 Daun jendela kaca 4 mm bingkai kayu kls I 6.38 m2 722,150.00 4,610,205.60
4 Engsel jendela 24.00 bh 53,666.00 1,287,984.00
5 Engsel pintu 4.00 bh 71,434.00 285,736.00
6 Grandel jendela 12.00 bh 76,546.00 918,552.00
7 Grandel pintu 1.00 bh 82,046.00 82,046.00
8 Kunci pintu 2 slaag 1.00 bh 492,497.00 492,497.00
9 Grendel tanam pintu 1.00 bh 82,046.00 82,046.00
TOTAL 29,247,359.58
VIII PEKERJAAN CAT
1 Cat dinding 232.91 m2 56,952.00 13,264,519.46
2 Cat plafond 92.90 m2 56,952.00 5,290,840.80
3 Pengecatan Kosen Pintu/Jendela/Vetilasi 3.08 m2 66,154.00 203,754.32
TOTAL 18,759,114.58
X PEKERJAAN INSTALASI LISTRIK
1 Instalasi listrik 4.00 ttk 1,178,543.00 4,714,172.00
2 Stop kontak merk brocco 2.00 bh 95,000.00 190,000.00
3 MCB komplit 1.00 unit 350,000.00 350,000.00
4 Lampu TL Bulat 23 watt 4.00 Unit 245,000.00 980,000.00
5 Lampu philps 23 watt 2.00 bh 175,000.00 350,000.00
TOTAL 6,584,172.00
G BANGUN SITE DEVELOMENT
I PEKERJAAN PERSIAPAN
1 Pengukuran dan pemasangan bouwplank 1.00 Ls 500,000.00 500,000.00
2 Pekerjaan Pembongkaran pembersihan Lokasi Pekerjaan 1.00 Ls 1,500,000.00 1,500,000.00
3 Asbuilt Drawing & Pelaporan 1.00 Ls 2,000,000.00 2,000,000.00
4 Papan Nama Proyek 1.00 Ls 500,000.00 500,000.00
TOTAL 4,500,000.00
II PEKERJAAN PEMBUATAN LAPANGAN BULU TANGKIS
I PEKERJAAN TANAH
1 Rabat beton 1 : 3 : 5 25.20 m3 1,390,622.00 35,043,674.40
2 Pengecatan 96.00 m2 56,952.00 5,467,392.00
3 pembuatan tiang net 2.00 bh 492,200.00 984,400.00
TOTAL 41,495,466.40
III PEKERJAAN SELASAR ANTAR BANGUNAN
I PEKERJAAN TANAH
1 Galian Tanah 3.50 m3 103,812.00 363,342.00
2 Urugan Pasir 4.80 m3 576,125.00 2,765,400.00
3 Rabat beton 1 : 3 : 5 8.97 m3 1,390,622.00 12,473,879.34
TOTAL 15,602,621.34
IV PEKERJAAN SALURAN KELILING LINGKUNGAN
I PEKERJAAN TANAH
1 Galian Tanah 10.13 m3 103,812.00 1,051,096.50
2 Pasangan batu kali 4.00 m3 1,420,457.00 5,681,828.00
3 Rabat beton 1 : 3 : 5 0.75 m3 1,390,622.00 1,042,966.50
4 Plesteran 30.00 m2 89,598.00 2,687,940.00
TOTAL 10,463,831.00
V PEKERJAAN TAMAN BERMAIN ANAK
1 Pengadaan Gasebo 4.00 unit 3,000,000.00 12,000,000.00
2 Pengadaan Ayunan 2.00 unit 1,500,000.00 3,000,000.00
3 Pengadaan seluncur 2.00 unit 1,500,000.00 3,000,000.00
TOTAL 18,000,000.00
VI PEKERJAAN LAPANGAN UPACARA
1 Galian Tanah 15.00 M3 103,812.00 1,557,180.00
2 Rabat beton 1 : 3 : 5 15.00 M3 1,390,622.00 20,859,330.00
3 Plesteran 300.00 M2 89,598.00 26,879,400.00
4 Pemasangan Paving Blok 150.00 M2 325,322.00 48,798,300.00
TOTAL 98,094,210.00
H BANGUN PAGAR KELILING
I PEKERJAAN PERSIAPAN
1 Pengukuran dan pemasangan bouwplank 1.00 Ls 500,000.00 500,000.00
2 Pekerjaan Pembongkaran pembersihan Lokasi Pekerjaan 1.00 Ls 1,500,000.00 1,500,000.00
TOTAL 2,000,000.00
II PEKERJAAN TANAH
1 Galian Tanah Pondasi 9.00 m3 103,812.00 934,308.00
2 Urugan Tanah Kembali (Ex galian) 3.00 m3 37,812.00 113,436.00
3 Urugan Pasir Bawah Pondasi 12.00 m3 576,125.00 6,913,500.00
TOTAL 7,961,244.00
III PEKERJAAN PASANGAN
1 Pasangan pondasi batu kali 1: 4 12.00 m3 1,420,457.00 17,045,484.00
2 Pasangan batu kosong (anstamping) 3.00 m3 915,073.00 2,745,219.00
3 Pasangan dinding pagar depan batu bata camp. 1 : 4 52.50 m2 440,055.00 23,102,887.50
4 Pasangan dinding pagar samping batu bata camp. 1 : 4 130.00 m2 440,055.00 57,207,150.00
TOTAL 100,100,740.50
I LAIN - LAIN
1 Pas. Saluran Kel. Bangunan 18.00 m1 152,084.35 2,737,518.37
2 Rabat Beton Kel Bangunan 1 : 3 : 5 5.95 m3 828,342.00 4,928,634.90
3 Pas. Pipa PVC 4" Saluran Air Kotor 10.00 m1 73,972.00 739,720.00
4 Pas. Pipa PVC 3/4" Saluran Air Bersih 14.50 m1 38,604.00 559,758.00
5 Pas. Kran Air 3/4" 8.00 Bh 37,345.00 298,760.00
6 Floor Drain 5.00 Bh 69,920.00 349,600.00
7 Pas. Bak Air 2.00 unit 673,000.00 1,346,000.00
8 Pas. Kloset Duduk 2.00 unit 2,000,000.00 4,000,000.00
9 Pas. Wastavel 2.00 unit 741,880.00 1,483,760.00
10 Pas Setictank + Rembesan 1.00 unit 7,450,779.66 7,450,779.66
11 Pas Anti Rayap 13.50 Bh 18,720.00 252,720.00
TOTAL 24,147,250.93
DAFTAR KUANTITAS DAN HARGA

NO URAIAN SAT. VOL. HARGA SAT (Rp) JUMLAH HARGA (Rp)

A PEMBANGUNAN RKB, LAB BAHASA DAN R. PERTEMUAN


I PEKERJAAN PERSIAPAN/UMUM
1 Pengukuran dan pemasangan bouwplank Ls 1.00 1,500,000.00 1,500,000.00
3 Papan Nama Proyek Ls 1.00 750,000.00 750,000.00
Jumlah 2,250,000.00
II PEKERJAAN LANTAI I
I PEKERJAAN TANAH
1 Galian Tanah Pondasi m3 119.73 103,812.00 12,429,410.76
2 Urugan Tanah Kembali (Ex galian) m3 66.41 37,812.00 2,511,094.92
3 Urugan Pasir Bawah Pondasi m3 11.97 576,125.00 6,897,944.63
4 Urugan material urug di bawah Lantai m3 30.47 576,125.00 17,554,528.75
Jumlah 39,392,979.06
III PEKERJAAN PASANGAN
1 Pasangan pondasi batu kali 1: 4 m3 23.95 1,420,457.00 34,019,945.15
2 Pasangan batu kosong (anstamping) m3 34.01 915,073.00 31,121,632.73
3 Pasangan dinding batu bata camp. 1 : 4 m2 167.23 215,149.00 35,979,367.27
Jumlah 101,120,945.15
IV PEKERJAAN PLESTERAN
1 Plesteran dinding camp. 1 : 4 m2 334.46 89,598.00 29,966,947.08
2 Pekerjaan Acian Dinding m2 334.46 50,902.00 17,024,682.92
Jumlah 46,991,630.00
V PEKERJAAN BETON
1 Beton Sloof 1:2:3 (S1 15/20) m3 4.61 5,462,224.49 25,180,854.88
2 Beton Kolom Selasar 1:2:3 (K1 20/20) m3 4.06 4,754,041.44 19,301,408.26
3 Beton Kolom Praktis (K1 15/15) m3 1.18 5,583,911.49 6,589,015.55
4 Beton Ring Balok 1:2:3 (15/20) m3 4.61 5,592,326.49 25,780,625.10
Jumlah 76,851,903.79
VI PEKERJAAN ATAP DAN PLAFOND
1 Pek Kuda-kuda, Gording dan ikatan angin ( kayu kls II) m3 9.25 8,683,647.00 80,308,781.51
2 Atap Zink Gelombang BJLS 0.25 m2 1,103.90 124,047.00 136,935,483.30
3 Bumbungan Atap zink Plat BJLS 0.28 m' 83.00 58,751.00 4,876,333.00
4 Pek Rangka Plafon m2 550.31 130,009.00 71,544,602.75
5 Pek. Plaafon m2 291.00 99,500.00 28,954,500.00
6 List plafond kayu m' 381.10 79,211.00 30,187,312.10
7 Papan listplank doubel kayu Kls I m' 192.60 132,907.00 25,597,888.20
Jumlah 378,404,900.85
VII PEK. LANTAI & KERAMIK
1 Rabat beton 1:3:5 t = 5 cm m3 6.72 1,390,622.00 9,344,979.84
2 Lantai tegel keramik 30/30 cm m2 211.95 215,957.00 45,772,086.15
4 Lantai keramik 30x30 cm (Teras) m2 52.20 215,957.00 11,272,955.40
Jumlah 66,390,021.39
VIII PEKERJAAN PINTU DAN JENDELA
1 Pek. Pas Kusen Pintu P1 m3 0.07 13,052,187.00 913,653.09
2 Pek. Pas Kusen Pintu P2 m3 0.14 13,052,187.00 1,827,306.18
3 Pek. Pas Kusen Jendela J1 m3 0.33 13,052,187.00 4,307,221.71
4 Kusen Jalusi Atap (Lubang Angin) m3 0.02 1,176,175.00 23,523.50
5 Pas. Daun pintu P1 (panil) m3 0.40 991,375.00 396,550.00
6 Pas. Daun Jendela m2 0.90 722,150.00 649,935.00
7 - Pas. Kait Angin psg 72.00 55,770.00 4,015,440.00
8 - Pas. Engsel Pintu Pcs 12.00 71,434.00 857,208.00
9 - Pas. Engsel jendela psg 72.00 53,666.00 3,863,952.00
10 - Pas. Grendel Jendela bh 36.00 76,546.00 2,755,656.00
11 - Pas. Kunci Tanam 2 Slag bh 3.00 492,497.00 1,477,491.00
Jumlah 21,087,936.48
IX PEKERJAAN CAT
1 Pek. Plamur dinding m2 334.46 56,952.00 19,048,165.92
2 Pek. Plamur Plafond m2 550.31 56,952.00 31,340,970.36
3 Pek. Cat Dinding m2 334.46 56,952.00 19,048,165.92
Pek. Cat Plafond m2 550.31 56,952.00 31,340,970.36
Pek. Cat kayu (cat dasar, plamur & finishing) m2 201.27 66,154.00 13,315,018.01
Pek. Teer Rangka Atap m2 1,103.90 66,154.00 73,027,400.60
Jumlah 187,120,691.17
X PEKERJAAN INSTALASI LISTRIK
1 Instalasi listrik ttk 36.00 1,178,543.00 42,427,548.00
2 Stop kontak merk brocco bh 11.00 95,000.00 1,045,000.00
3 Lampu TL Bulat 23 watt Bh 16.00 245,000.00 3,920,000.00
4 Lampu philps 23 watt bh 20.00 175,000.00 3,500,000.00
Jumlah 50,892,548.00
NO URAIAN SAT. VOL. HARGA SAT (Rp) JUMLAH HARGA (Rp)

B PEMBANGUNAN RUANG GURU DAN PERPUSTAKAAN


I PEKERJAAN PERSIAPAN/UMUM
1 Pengukuran dan pemasangan bouwplank Ls 1.00 1,500,000.00 1,500,000.00
3 Papan Nama Proyek Ls 1.00 250,000.00 250,000.00
Jumlah 1,750,000.00
II PEKERJAAN LANTAI I
I PEKERJAAN TANAH
1 Galian Tanah Pondasi m3 36.00 103,812.00 3,737,232.00
2 Urugan Tanah Kembali (Ex galian) m3 11.03 37,812.00 416,877.30
3 Urugan Pasir Bawah Pondasi m3 10.20 576,125.00 5,876,475.00
4 Urugan material urug di bawah Lantai m3 14.00 576,125.00 8,065,750.00
Jumlah 18,096,334.30
III PEKERJAAN PASANGAN
1 Pasangan pondasi batu kali 1: 4 m3 105.77 1,420,457.00 150,247,418.72
2 Pasangan batu kosong (anstamping) m3 20.40 915,073.00 18,667,489.20
3 Pasangan dinding batu bata camp. 1 : 4 m2 80.45 215,149.00 17,308,737.05
Jumlah 186,223,644.97
IV PEKERJAAN PLESTERAN
1 Plesteran dinding camp. 1 : 4 m2 160.90 89,598.00 14,416,318.20
2 Pekerjaan Acian Dinding m2 160.90 50,902.00 8,190,131.80
Jumlah 22,606,450.00
V PEKERJAAN BETON
1 Beton Sloof 1:2:3 (S1 15/20) m3 3.06 5,462,224.49 16,714,406.93
2 Beton Kolom Selasar 1:2:3 (K1 20/20) m3 0.20 4,754,041.44 931,792.12
3 Beton Ring Balok 1:2:3 (15/20) m3 3.06 5,592,326.49 17,112,519.05
Jumlah 34,758,718.09
VI PEKERJAAN ATAP BAJA RINGAN DAN PLAFOND
1 Kuda-kuda Baja Ringan (Canal C 75/100) m2 216.64 364,943.00 79,061,251.52
2 Atap Genteng Metal m2 216.64 260,452.00 56,424,321.28
3 Bumbungan Atap Genteng m' 27.08 140,827.00 3,813,595.16
4 Pek Plafond Triplek + Rangka m2 222.05 130,009.00 28,868,498.45
5 List plafond kayu m' 184.10 79,211.00 14,582,745.10
6 Papan listplank doubel kayu Kls I m' 54.00 132,907.00 7,176,978.00
Jumlah 189,927,389.51
VII PEK. LANTAI & KERAMIK
1 Rabat beton 1:3:5 t = 5 cm m3 22.43 1,390,622.00 31,184,698.35
2 Lantai tegel keramik 30/30 cm m2 172.00 215,957.00 37,144,604.00
Jumlah 68,329,302.35
VIII PEKERJAAN PINTU DAN JENDELA
1 Pek. Pas Kusen Pintu P1 m3 0.14 13,052,187.00 1,827,306.18
2 Pek. Pas Kusen Jendela J1 m3 0.22 13,052,187.00 2,871,481.14
3 Kusen Jalusi Atap (Lubang Angin) m3 0.13 13,052,187.00 1,696,784.31
4 Pas. Daun pintu P1 (panil) m3 0.80 991,375.00 793,100.00
5 Pas. Daun Jendela m3 0.21 722,150.00 151,651.50
6 - Pas. Kait Angin psg 8.00 55,770.00 446,160.00
7 - Pas. Engsel Pintu Psg 6.00 71,434.00 428,604.00
8 - Pas. Engsel jendela psg 8.00 53,666.00 429,328.00
9 - Pas. Grendel Jendela bh 8.00 76,546.00 612,368.00
10 - Pas. Kunci Tanam 2 Slag bh 6.00 492,497.00 2,954,982.00
Jumlah 12,211,765.13
IX PEKERJAAN CAT
1 Pek. Plamur dinding m2 160.90 56,952.00 9,163,576.80
2 Pek. Plamur Plafond m2 222.05 56,952.00 12,646,191.60
3 Pek. Cat Dinding m2 160.90 56,952.00 9,163,576.80
Pek. Cat Plafond m2 222.05 56,952.00 12,646,191.60
Pek. Cat kayu (cat dasar, plamur & finishing) m2 70.29 66,154.00 4,649,885.28
Pek. Teer Rangka Atap m2 86.40 66,154.00 5,715,705.60
Jumlah 53,985,127.68
X PEKERJAAN INSTALASI LISTRIK
1 Instalasi listrik ttk 8.00 1,178,543.00 9,428,344.00
2 Stop kontak merk brocco bh 2.00 95,000.00 190,000.00
3 Lampu TL Bulat 23 watt Bh 4.00 245,000.00 980,000.00
4 Lampu philps 23 watt bh 4.00 175,000.00 700,000.00
Jumlah 11,298,344.00
X PEKERJAAN LAIN - LAIN
1 Pek Galian Saluran m3 18.00 103,812.00 1,868,616.00
Pas. Batu Kali ad. 1 : 4 m3 9.82 1,420,457.00 13,948,887.74
Plesteran dinding Saluran camp. 1 : 4 m2 65.45 215,149.00 14,081,502.05
Rabat Beton Kel. bangunan 1: 3 : 5 T = 5 cm M3 60.00 1,390,622.00 83,437,320.00
Pas. Pipa PVC 4" saluran Air Kotor m' 14.50 200,799.00 2,911,585.50
Pas. Pipa PVC 3/4" Saluran air bersih m' 2.00 43,994.00 87,988.00
NO URAIAN SAT. VOL. HARGA SAT (Rp) JUMLAH HARGA (Rp)

Pas. Kran air 3/4" Bh 1.00 80,863.00 80,863.00


Pas. Wastafel Bh 31.50 2,127,741.00 67,023,841.50
Jumlah 183,440,603.79
NO URAIAN SAT. VOL. HARGA SAT (Rp) JUMLAH HARGA (Rp)

C PEMBANGUNAN WC SEKOLAH
I PEKERJAAN PERSIAPAN/UMUM
1 Pengukuran dan pemasangan bouwplank Ls 1.00 1,500,000.00 1,500,000.00
2 Pembangunan Gudang dan Barak Kerja Ls 1.00 7,500,000.00 7,500,000.00
3 Papan Nama Proyek Ls 1.00 250,000.00 250,000.00
Jumlah 9,250,000.00
II PEKERJAAN LANTAI I
I PEKERJAAN TANAH
1 Galian Tanah Pondasi m3 28.80 103,812.00 2,989,785.60
2 Urugan Tanah Kembali (Ex galian) m3 8.82 37,812.00 333,501.84
3 Urugan Pasir Bawah Pondasi m3 2.88 576,125.00 1,659,240.00
4 Urugan material urug di bawah Lantai m3 5.40 576,125.00 3,111,075.00
Jumlah 8,093,602.44
III PEKERJAAN PASANGAN
1 Pasangan pondasi batu kali 1: 4 m3 7.20 1,420,457.00 10,227,290.40
2 Pasangan batu kosong (anstamping) m3 5.76 915,073.00 5,270,820.48
3 Pasangan dinding batu bata camp. 1 : 4 m2 101.57 215,149.00 21,853,114.23
Jumlah 37,351,225.11
IV PEKERJAAN PLESTERAN
1 Plesteran dinding camp. 1 : 4 m2 181.04 89,598.00 16,221,180.31
2 Pekerjaan Acian Dinding m2 181.04 50,902.00 9,215,501.69
25,436,682.00
V PEKERJAAN BETON
1 Beton Sloof 1:2:3 (S1 15/20) m3 1.08 5,462,224.49 5,899,202.44
2 Beton Kolom 1:2:3 (K1 15/15) m3 1.02 4,754,041.44 4,849,122.27
3 Beton Ring Balok 1:2:3 (15/20) m3 1.08 5,592,326.49 6,039,712.60
Jumlah 16,788,037.32
VI PEKERJAAN ATAP DAN PLAFOND
1 Pek Kuda-kuda, Gording dan ikatan angin ( kayu kls II) m3 0.54 8,683,647.00 4,689,169.38
2 Atap Zink Gelombang BJLS 0.25 m2 30.00 260,452.00 7,813,560.00
3 Bumbungan Atap zink Plat BJLS 0.28 m' 6.00 140,827.00 844,962.00
4 Pek Plafond Triplek + Rangka m2 52.20 130,009.00 6,786,469.80
5 List plafond kayu m' 65.00 79,211.00 5,148,715.00
6 Papan listplank doubel kayu Kls I m' 22.00 132,907.00 2,923,954.00
Jumlah 28,206,830.18
VII PEK. LANTAI & KERAMIK
1 Beton Lantai Kerja 1: 3 : 5 m3 1.08 1,390,622.00 1,501,871.76
2 Keramik Dinding KM/WC (20/25) m2 22.10 236,126.00 5,218,384.60
3 Lantai keramik km/wc 20/20 m2 24.04 236,126.00 5,676,469.04
4 Pek. Lantai keramik 30x30 cm m2 18.09 215,957.00 3,906,662.13
Jumlah 16,303,387.53
VIII PEKERJAAN PINTU DAN JENDELA
1 Pek. Pas Kusen Pintu P1 m3 0.09 13,052,187.00 1,174,696.83
2 Pek. Pas Kusen Pintu P2 m3 0.05 13,052,187.00 652,609.35
3 Pas. Daun pintu P1 (panil) m3 0.27 991,375.00 267,671.25
4 Pas. Daun pintu P1 (panil) m3 0.13 991,375.00 128,878.75
5 - Pas. Engsel Pintu Pcs 10.00 71,434.00 714,340.00
6 - Pas. Kunci Tanam 2 Slag bh 6.00 492,497.00 2,954,982.00
Jumlah 5,893,178.18
IX PEKERJAAN CAT
1 Pek. Plamur dinding m2 181.04 50,902.00 9,215,501.69
2 Pek. Plamur Plafond m2 52.20 50,902.00 2,657,084.40
3 Pek. Cat Dinding m2 181.04 56,952.00 10,310,817.89
Pek. Cat Plafond m2 52.20 56,952.00 2,972,894.40
Pek. Cat kayu (cat dasar, plamur & finishing) m2 58.25 66,154.00 3,853,391.12
Pek. Teer Rangka Atap m2 86.40 66,154.00 5,715,705.60
Jumlah 34,725,395.09
X PEKERJAAN INSTALASI LISTRIK
1 Instalasi listrik ttk 6.00 1,178,543.00 7,071,258.00
2 Stop kontak merk brocco bh 4.00 95,000.00 380,000.00
3 Lampu TL Bulat 23 watt Bh 3.00 245,000.00 735,000.00
4 Lampu philps 23 watt bh 3.00 175,000.00 525,000.00
Jumlah 8,711,258.00
NO URAIAN SAT. VOL. HARGA SAT (Rp) JUMLAH HARGA (Rp)

X PEKERJAAN LAIN - LAIN


1 Pek Galian Saluran m3 18.00 103,812.00 1,868,616.00
2 Pas. Batu Kali ad. 1 : 4 m3 4.91 1,420,457.00 6,974,443.87
3 Plesteran dinding Saluran camp. 1 : 4 m2 0.28 215,149.00 60,241.72
4 Rabat Beton Kel. bangunan 1: 3 : 5 T = 5 cm M3 5.95 1,390,622.00 8,274,200.90
5 Pas. Pipa PVC 4" saluran Air Kotor m' 10.00 200,799.00 2,007,990.00
6 Pas. Pipa PVC 3/4" Saluran air bersih m' 14.50 43,994.00 637,913.00
7 Pas. Kran air 3/4" Bh 8.00 80,863.00 646,904.00
8 Floor Drain Bh 5.00 277,282.00 1,386,410.00
9 Pas. Bak Air Unit 2.00 2,500,000.00 5,000,000.00
10 Pas. Klosed Duduk Bh 2.00 3,837,900.00 7,675,800.00
11 Pas. Wastafel Bh 2.00 2,127,741.00 4,255,482.00
12 Pek. Septictank + Rembesan Ls 1.00 7,500,000.00 7,500,000.00
Jumlah 46,288,001.49
D PEKERJAAN PAGAR
1 Galian Tanah pondasi m3 247.20 103,812.00 25,662,326.40
2 Urugan Tanah Kembali (Ex galian) m3 11.83 37,812.00 447,315.96
3 Pasangan Batu Kali m3 124.32 1,420,457.00 176,591,214.24
4 Pekerjaan slof beton 15/20 m3 8.88 5,462,224.49 48,504,553.43
5 pekerjaan kolom 20/25 m3 13.32 6,527,342.69 86,944,204.66
6 Pasangan dinding bataco m2 444.00 215,149.00 95,526,156.00
7 Pekerjaan Ring Balk 15/15 m3 6.66 6,535,757.69 43,528,146.23
8 Pekerjaan Plesteran m2 1,021.00 89,598.00 91,479,558.00
9 Pekerjaan Acian m2 1,021.00 50,902.00 51,970,942.00
10 Plamir m2 1,021.00 50,902.00 51,970,942.00
11 pengecatan m2 1,021.00 56,952.00 58,147,992.00
Jumlah 730,773,350.93
E PEKERJAAN BULU TANGKIS
1 Rabat Beton m3 82.00 1,390,622.00 114,031,004.00
Jumlah 114,031,004.00
F PEKERJAAN GAPURA SEKOLAH
1 Galian Tanah pondasi m3 3.32 103,812.00 344,655.84
2 Urugan Tanah Kembali (Ex galian) m3 0.11 37,812.00 4,272.76
3 pondasi beton bertulang m3 0.57 3,467,670.95 1,959,234.09
4 pekerjaan kolom 60/30 m3 1.20 3,270,386.68 3,914,652.85
5 Pasangan dinding bataco m3 4.52 215,149.00 972,473.48
6 Pekerjaan Ring Balk 15/15 m3 0.80 6,535,757.69 5,222,070.40
7 Pekerjaan Plesteran m2 21.80 89,598.00 1,953,236.40
8 Pekerjaan Acian m2 21.80 50,902.00 1,109,663.60
9 Plamir m2 21.80 50,902.00 1,109,663.60
10 pengecatan m2 21.80 56,952.00 1,241,553.60
11 Anti Rayap Ls 1.00 29,250,000.00 29,250,000.00
Jumlah 47,081,476.61
DAFTAR KUANTITAS DAN HARGA

KEGIATAN : REHABILITASI DAN RENOVASI SARANA PRASARANA SEKOLAH


PEKERJAAN : REHABILITASI DAN RENOVASI SARANA PRASARANA SEKOLAH SMP NEGERI 5 TELUK ELPAPUTIH
LOKASI : SMP NEGERI 5 TELUK ELPAPUTIH
T.ANGGARAN : 2019

HARGA SATUAN
NO URAIAN PEKERJAAN SATUAN VOLUME (Rp.) TOTAL HARGA (Rp.)

SMP NEGERI 5 TELUK ELPAPUTIH


BANGUN 3 RUANG KELAS
PEKERJAAN PERSIAPAN/UMUM
Pengukuran dan pemasangan bouwplank Ls 1.00 2,500,000.00 2,500,000.00
Pekerjaan Pembongkaran pembersihan Lokasi Pekerjaan Ls 1.00 15,000,000.00 15,000,000.00
PEKERJAAN LANTAI I
PEKERJAAN TANAH
Galian Tanah Pondasi m3 86.40 103,812.00 8,969,356.80
Urugan Tanah Kembali (Ex galian) m3 26.46 37,812.00 1,000,505.52
Urugan Pasir Bawah Pondasi m3 8.64 576,125.00 4,977,720.00
Urugan material urug di bawah Lantai m3 67.20 348,012.00 23,386,406.40
PEKERJAAN PASANGAN
Pasangan pondasi batu kali 1 4 m3 34.02 1,420,457.00 48,323,947.14
Pasangan batu kosong (anstamping) m3 17.28 915,073.00 15,812,461.44
Pasangan dinding batu bata camp. 1 4 m2 206.21 215,149.00 44,365,875.29
PEKERJAAN PLESTERAN
Plesteran dinding camp. 1 4 m2 412.42 89,598.00 36,952,007.16
Pekerjaan Acian Dinding m2 412.42 50,902.00 20,993,002.84
PEKERJAAN BETON
Sloof Beton utama 15/20 (177.12 kg/m3) m3 4.76 5,462,224.49 26,000,188.55
Kolom Beton Utama 15/20 (177.12 kg/m3) m3 2.89 5,583,911.49 16,137,504.19
Kolom Praktis 15/15 (224.45 kg/m3) m3 0.51 5,583,911.49 2,847,794.86
Balok 15/20 (177.12 kg/m3) m3 3.50 5,592,326.49 19,573,142.70
PEKERJAAN ATAP BAJA RINGAN DAN PLAFOND
Kuda-kuda Baja Ringan (Canal C 75/100) m2 245.00 364,943.00 89,411,035.00
Atap Genteng Metal m2 245.00 260,452.00 63,810,740.00
Bumbungan Atap Genteng m 26.60 140,827.00 3,745,998.20
Rangka plafond kayu Kls II m2 141.27 130,009.00 18,366,371.43
Plafond tripleks 3 mm m2 282.54 99,500.00 28,112,730.00
List plafond kayu m 75.00 79,211.00 5,940,825.00
Balok bubungan kayu Kls II m 26.60 140,827.00 3,745,998.20
Papan listplank doubel kayu Kls I m 78.60 132,907.00 10,446,490.20
PEK. LANTAI & KERAMIK
Rabat beton 135 t = 5 cm m3 7.95 1,390,622.00 11,055,444.90
Lantai tegel keramik 30/30 cm m2 158.96 215,957.00 34,328,524.72
Plint Tegel dalam Ruangan m1 10.48 37,903.00 397,223.44
Lantai keramik 30x30 cm (teras) m2 52.20 215,957.00 11,272,955.40
PEKERJAAN PINTU DAN JENDELA
Kusen pintu, jendela, ventilasi kayu kls I m3 1.54 13,052,187.00 20,100,367.98
Daun pintu panel kayu kls I m2 4.20 991,375.00 4,163,775.00
Daun jendela kaca 4 mm bingkai kayu kls I m2 92.16 722,150.00 66,553,344.00
Engsel jendela bh 24.00 53,666.00 1,287,984.00
Engsel pintu bh 6.00 71,434.00 428,604.00
Grandel jendela bh 12.00 76,546.00 918,552.00
Grandel pintu bh 3.00 76,546.00 229,638.00
Kunci pintu 2 slaag bh 3.00 492,497.00 1,477,491.00
Grendel tanam pintu bh 3.00 71,434.00 214,302.00
PEKERJAAN CAT
Cat dinding m2 412.42 56,952.00 23,488,143.84
Cat plafond m2 211.16 56,952.00 12,025,984.32
Pengecatan Kosen Pintu/Jendela/Vetilasi m2 3.08 66,154.00 203,754.32
PEKERJAAN INSTALASI LISTRIK
Instalasi listrik ttk 12.00 1,178,543.00 14,142,516.00
Stop kontak merk brocco bh 6.00 95,000.00 570,000.00
MCB komplit Unit 1.00 350,000.00 350,000.00
Lampu TL Bulat 10 watt Unit 12.00 175,000.00 2,100,000.00
Lampu philps 20 watt bh 6.00 245,000.00 1,470,000.00
BANGUN RUANG LABORATORIUM
PEKERJAAN PERSIAPAN/UMUM
Pengukuran dan pemasangan bouwplank Ls 1.00 2,500,000.00 2,500,000.00
Pekerjaan Pembongkaran pembersihan Lokasi Pekerjaan Ls 1.00 15,000,000.00 15,000,000.00
PEKERJAAN LANTAI I
PEKERJAAN TANAH
Galian Tanah Pondasi m3 35.20 103,812.00 3,654,182.40
Urugan Tanah Kembali (Ex galian) m3 10.78 37,812.00 407,613.36
Urugan Pasir Bawah Pondasi m3 3.52 576,125.00 2,027,960.00
Urugan material urug di bawah Lantai m3 42.00 348,012.00 14,616,504.00
PEKERJAAN PASANGAN
Pasangan pondasi batu kali 1 4 m3 13.86 1,420,457.00 19,687,534.02
Pasangan batu kosong (anstamping) m3 7.04 915,073.00 6,442,113.92
Pasangan dinding batu bata camp. 1 4 m2 116.45 215,149.00 25,054,101.05
PEKERJAAN PLESTERAN
Plesteran dinding camp. 1 4 m2 232.91 89,598.00 20,868,270.18
Pekerjaan Acian Dinding m2 232.91 50,902.00 11,855,584.82
PEKERJAAN BETON
Sloof Beton utama 15/20 (177.12 kg/m3) m3 1.32 5,462,224.49 7,210,136.32
Kolom Beton Utama 15/20 (177.12 kg/m3) m3 0.98 5,583,911.49 5,472,233.26
Kolom Praktis 15/15 (224.45 kg/m3) m3 0.75 5,583,911.49 4,187,933.61
Balok 15/20 (177.12 kg/m3) m3 1.03 5,592,326.49 5,760,096.28
PEKERJAAN ATAP BAJA RINGAN DAN PLAFOND
Kuda-kuda Baja Ringan (Canal C 75/100) m2 115.00 364,943.00 41,968,445.00
Atap Genteng Metal m2 115.00 260,452.00 29,951,980.00
Bumbungan Atap Genteng m 17.00 140,827.00 2,394,059.00
Rangka plafond kayu Kls II m2 32.67 130,009.00 4,247,394.03
Plafond tripleks 3 mm m2 98.00 99,500.00 9,751,000.00
List plafond kayu m 30.00 79,211.00 2,376,330.00
Balok bubungan kayu Kls II m 17.00 140,827.00 2,394,059.00
Papan listplank doubel kayu Kls I m 30.00 132,907.00 3,987,210.00
PEK. LANTAI & KERAMIK
Rabat beton 135 t = 5 cm m3 5.09 1,390,622.00 7,078,265.98
Lantai tegel keramik 30/30 cm m2 101.72 215,957.00 21,967,146.04
Plint Tegel dalam Ruangan m1 4.20 37,903.00 159,192.60
Lantai keramik 30x30 cm (teras) m2 25.00 215,957.00 5,398,925.00
PEKERJAAN PINTU DAN JENDELA
Kusen pintu, jendela, ventilasi kayu kls I m3 1.25 13,052,187.00 16,315,233.75
Daun pintu panel kayu kls I m2 1.40 991,375.00 1,387,925.00
Daun jendela kaca 4 mm bingkai kayu kls I m2 6.38 722,150.00 4,607,317.00
Engsel jendela bh 24.00 53,666.00 1,287,984.00
Engsel pintu bh 4.00 71,434.00 285,736.00
Grandel jendela bh 12.00 76,546.00 918,552.00
Grandel pintu bh 1.00 76,546.00 76,546.00
Kunci pintu 2 slaag bh 1.00 492,497.00 492,497.00
Grendel tanam pintu bh 1.00 71,434.00 71,434.00
PEKERJAAN CAT
Cat dinding m2 232.91 56,952.00 13,264,690.32
Cat plafond m2 126.72 56,952.00 7,216,957.44
Pengecatan Kosen Pintu/Jendela/Vetilasi m2 2.50 66,154.00 165,385.00
PEKERJAAN INSTALASI LISTRIK
Instalasi listrik ttk 6.00 1,178,543.00 7,071,258.00
Stop kontak merk brocco bh 6.00 95,000.00 570,000.00
MCB komplit Unit 1.00 350,000.00 350,000.00
Lampu TL Bulat 10 watt Unit 4.00 175,000.00 700,000.00
Lampu philps 20 watt bh 2.00 245,000.00 490,000.00
SITE DEVELOPMENT
PEKERJAAN PERSIAPAN/UMUM
Pengukuran dan pemasangan bouwplank Ls 1.00 2,000,000.00 2,000,000.00
Pekerjaan Pembongkaran pembersihan Lokasi Pekerjaan Ls 1.00 5,000,000.00 5,000,000.00
Papan Nama Proyek Ls 1.00 250,000.00 250,000.00
PEKERJAAN PEMBUATAN LAPANGAN BULU TANGKIS
PEKERJAAN TANAH
Rabat beton 1 3 5 m3 25.20 1,390,622.00 35,043,674.40
Pengecatan m2 96.00 56,952.00 5,467,392.00
pembuatan tiang net bh 2.00 3,500,000.00 7,000,000.00
PEKERJAAN SELASAR ANTAR BANGUNAN
Galian Tanah m3 3.50 103,812.00 363,342.00
Urugan Pasir m3 4.80 576,125.00 2,765,400.00
Rabat beton 1 3 5 m3 8.97 1,390,622.00 12,473,879.34
PEKERJAAN SALURAN KELILING LINGKUNGAN
Galian Tanah m3 10.13 103,812.00 1,051,615.56
Pasangan batu kali m2 4.00 1,420,457.00 5,681,828.00
Rabat beton 1 3 5 m3 0.75 1,390,622.00 1,042,966.50
Plesteran m2 30.00 89,598.00 2,687,940.00
PEKERJAAN TAMAN BERMAIN ANAK
Pengadaan Gasebo unit 4.00 35,000,000.00 140,000,000.00
Pengadaan Ayunan unit 2.00 7,500,000.00 15,000,000.00
Pengadaan seluncur unit 2.00 7,500,000.00 15,000,000.00
PEKERJAAN LAPANGAN UPACARA
Galian Tanah m3 15.00 103,812.00 1,557,180.00
Rabat beton 1 3 5 m3 15.00 1,390,622.00 20,859,330.00
Plesteran m2 300.00 89,598.00 26,879,400.00
Ppemasangan paving blok m2 150.00 335,123.00 50,268,450.00
PEMBANGUNAN PAGAR KELILING
PEKERJAAN PERSIAPAN/UMUM
Pengukuran dan pemasangan bouwplank Ls 1.00 2,000,000.00 2,000,000.00
Pekerjaan Pembongkaran pembersihan Lokasi Pekerjaan Ls 1.00 5,000,000.00 5,000,000.00
PEKERJAAN TANAH
PEKERJAAN TANAH
Galian Tanah Pondasi m3 28.00 103,812.00 2,906,736.00
Urugan Tanah Kembali (Ex galian) m3 9.33 37,812.00 352,785.96
Urugan Pasir Bawah Pondasi m3 3.50 576,125.00 2,016,437.50
PEKERJAAN PASANGAN
Pasangan pondasi batu kali 1 4 m3 21.00 1,420,457.00 29,829,597.00
Pasangan batu kosong (anstamping) m3 6.40 915,073.00 5,856,467.20
Pasangan dinding pagar depan batu bata camp. 1 4 m2 52.50 215,149.00 11,295,322.50
Pasangan dinding pagar samping batu bata camp. 1 4 m2 280.00 215,149.00 60,241,720.00
Anti Rayap Ls 1.00 29,250,000.00 29,250,000.00
PEKERJAAN AKHIR
Dokumentasi dan Pelaporan Ls 1.00 2,500,000.00 2,500,000.00
As Built Drawing Ls 1.00 3,500,000.00 3,500,000.00
Pembersihan Akhir Ls 1.00 1,500,000.00 1,500,000.00
PEKERJAAN PENGADAAN K3
Alat Pelindung Diri (APD)
Topi Pelindung (Safet Helmet) Bh 45.00 115,000.00 5,175,000.00
Pelindung Pernapasan Pcs 90.00 10,000.00 900,000.00
Sarung Tangan (Safety) Pcs 90.00 10,000.00 900,000.00
Sepatu tangan (Safety Lars) Bh 45.00 225,000.00 10,125,000.00
Rompi Keselamatan (Sefety Vast Bh 90.00 85,000.00 7,650,000.00
Sabuk Keselamatan (Sefety Belt) Bh 45.00 45,000.00 2,025,000.00
Fasilitas Sarana Kesehatan
P3K Set 1.00 3,500,000.00 3,500,000.00
DAFTAR KUANTITAS DAN HARGA

KEGIATAN : REHABILITASI DAN RENOVASI SARANA PRASARANA SEKOLAH


PEKERJAAN : REHABILITASI DAN RENOVASI SARANA PRASARANA SEKOLAH SD NEGERI 2 YALAHATAN
LOKASI : SD NEGERI 2 YALAHATAN
T.ANGGARAN : 2019

NO URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN (Rp.) TOTAL HARGA (Rp.)

SD NEGERI 2 YALAHATAN
BANGUN 1 RUANG KELAS BELAJAR
PEKERJAAN PERSIAPAN
Pengukuran dan pemasangan bouwplank Ls 1.00 2,500,000.00 2,500,000.00
Pekerjaan Pembongkaran pembersihan Lokasi Pekerjaan Ls 1.00 15,000,000.00 15,000,000.00
PEKERJAAN TANAH
Galian Tanah Pondasi M3 33.60 103,812.00 3,488,083.20
Urugan Tanah Kembali (Ex galian) M3 10.29 37,812.00 389,085.48
Urugan Pasir Bawah Pondasi M3 3.36 576,125.00 1,935,780.00
Urug Pasir di bawah Lantai M3 22.40 576,125.00 12,905,200.00
PEKERJAAN PASANGAN
Pasangan pondasi batu kali 1 4 M3 13.23 1,420,457.00 18,792,646.11
Pasangan batu kosong (anstamping) M3 6.72 915,073.00 6,149,290.56
Pasangan dinding batu bata camp. 1 4 M2 116.45 215,149.00 25,054,101.05
PEKERJAAN PLESTERAN
Plesteran dinding camp. 1 4 M2 232.91 89,598.00 20,868,270.18
Pekerjaan Acian Dinding M2 232.91 50,902.00 11,855,584.82
PEKERJAAN BETON
Sloof Beton utama 15/20 (177.12 kg/m3) M3 1.86 5,462,224.49 10,159,737.54
Kolom Beton Utama 15/20 (177.12 kg/m3) M3 1.19 5,583,911.49 6,644,854.67
Kolom Praktis 15/15 (224.45 kg/m3) M3 0.27 6,535,757.69 1,764,654.58
Balok 15/20 (177.12 kg/m3) M3 1.64 5,592,326.49 9,171,415.44
PEKERJAAN ATAP BAJA RINGAN DAN PLAFON
Kuda-kuda Baja Ringan (Canal C 75/100) M2 101.70 364,943.00 37,114,703.10
Atap Genteng Metal M2 101.70 260,452.00 26,487,968.40
Bumbungan Atap Genteng M1 9.00 140,827.00 1,267,443.00
Rangka Plafon Kayu Kls II M3 54.59 130,009.00 7,097,191.31
Plafon Tripleks 3 mm M2 109.17 99,500.00 10,862,415.00
List Plafon Kayu M1 50.00 79,211.00 3,960,550.00
Balok Bumbungan Kayu Kls II M1 9.00 140,827.00 1,267,443.00
Papan Lisplank Doubel Kayu Kls I M1 30.00 132,907.00 3,987,210.00
PEKERJAAN LANTAI DAN KERAMIK
Rabat beton 135 t = 5 cm M3 2.65 1,390,622.00 3,685,148.30
Lantai tegel keramik 30/30 cm M2 52.99 215,957.00 11,443,561.43
Plint Tegel dalam Ruangan M1 3.60 37,903.00 136,450.80
Lantai keramik 30x30 cm (teras) M2 17.07 215,957.00 3,686,385.99
PEKERJAAN PINTU DAN JENDELA
Kusen pintu, jendela, ventilasi kayu kls I M3 1.54 13,052,187.00 20,100,367.98
Daun pintu panel kayu kls I M3 1.40 991,375.00 1,387,925.00
Daun jendela kaca 4 mm bingkai kayu kls I M2 6.38 722,150.00 4,607,317.00
Engsel jendela Bh 24.00 53,666.00 1,287,984.00
Engsel pintu Bh 4.00 71,434.00 285,736.00
Grandel jendela Bh 12.00 76,546.00 918,552.00
Grandel pintu Bh 1.00 76,546.00 76,546.00
Kunci pintu 2 slaag Bh 1.00 492,497.00 492,497.00
Grendel tanam pintu Bh 1.00 71,434.00 71,434.00
PEKERJAAN CAT
Cat dinding M2 232.91 56,952.00 13,264,690.32
Cat plafond M2 70.06 56,952.00 3,990,057.12
Pengecatan Kosen Pintu/Jendela/Vetilasi M2 3.08 66,154.00 203,754.32
PEKERJAAN INSTALASI LISTRIK
Instalasi listrik Titik 4.00 1,178,543.00 4,714,172.00
Stop kontak merk brocco Bh 2.00 95,000.00 190,000.00
MCB komplit Unit 1.00 350,000.00 350,000.00
Lampu TL Bulat 10 watt Bh 4.00 175,000.00 700,000.00
Lampu philps 20 watt Bh 2.00 245,000.00 490,000.00
BANGUN 3 RUANG KELAS BELAJAR
PEKERJAAN PERSIAPAN
Pengukuran dan pemasangan bouwplank Ls 1.00 2,500,000.00 2,500,000.00
Pekerjaan Pembongkaran pembersihan Lokasi Pekerjaan Ls 1.00 15,000,000.00 15,000,000.00
PEKERJAAN TANAH
Galian Tanah Pondasi M3 86.40 103,812.00 8,969,356.80
Urugan Tanah Kembali (Ex galian) M3 26.46 37,812.00 1,000,505.52
Urugan Pasir Bawah Pondasi M3 8.64 576,125.00 4,977,720.00
Urug Pasir di bawah Lantai M3 67.20 576,125.00 38,715,600.00
PEKERJAAN PASANGAN
Pasangan pondasi batu kali 1 4 M3 34.02 1,420,457.00 48,323,947.14
Pasangan batu kosong (anstamping) M3 17.28 915,073.00 15,812,461.44
Pasangan dinding batu bata camp. 1 4 M2 206.21 215,149.00 44,365,875.29
PEKERJAAN PLESTERAN
Plesteran dinding camp. 1 4 M2 412.42 89,598.00 36,952,007.16
Pekerjaan Acian Dinding M2 412.42 50,902.00 20,993,002.84
PEKERJAAN BETON
Sloof Beton utama 15/20 (177.12 kg/m3) M3 4.76 5,462,224.49 26,000,188.55
Kolom Beton Utama 15/20 (177.12 kg/m3) M3 2.89 5,583,911.49 16,137,504.19
Kolom Praktis 15/15 (224.45 kg/m3) M3 0.51 6,535,757.69 3,333,236.42
Balok 15/20 (177.12 kg/m3) M3 3.50 5,592,326.49 19,573,142.70
PEKERJAAN ATAP BAJA RINGAN DAN PLAFON
Kuda-kuda Baja Ringan (Canal C 75/100) M3 245.00 364,943.00 89,411,035.00
Atap Genteng Metal M2 245.00 260,452.00 63,810,740.00
Bumbungan Atap Genteng M1 26.60 140,827.00 3,745,998.20
Rangka Plafon Kayu Kls II M3 141.27 130,009.00 18,366,371.43
Plafon Tripleks 3 mm M2 282.54 99,500.00 28,112,730.00
List Plafon Kayu M1 75.00 79,211.00 5,940,825.00
Balok Bumbungan Kayu Kls II M1 26.60 140,827.00 3,745,998.20
Papan Lisplank Doubel Kayu Kls I M1 78.60 132,907.00 10,446,490.20
PEKERJAAN LANTAI DAN KERAMIK
Rabat beton 135 t = 5 cm M3 7.95 1,390,622.00 11,055,444.90
Lantai tegel keramik 30/30 cm M2 158.96 215,957.00 34,328,524.72
Plint Tegel dalam Ruangan M1 10.48 37,903.00 397,223.44
Lantai keramik 30x30 cm (teras) M2 52.20 215,957.00 11,272,955.40
PEKERJAAN PINTU DAN JENDELA
Kusen pintu, jendela, ventilasi kayu kls I M3 1.54 13,052,187.00 20,100,367.98
Daun pintu panel kayu kls I M3 4.20 991,375.00 4,163,775.00
Daun jendela kaca 4 mm bingkai kayu kls I M2 92.16 722,150.00 66,553,344.00
Engsel jendela Bh 24.00 53,666.00 1,287,984.00
Engsel pintu Bh 6.00 71,434.00 428,604.00
Grandel jendela Bh 12.00 76,546.00 918,552.00
Grandel pintu Bh 3.00 76,546.00 229,638.00
Kunci pintu 2 slaag Bh 3.00 492,497.00 1,477,491.00
Grendel tanam pintu Bh 3.00 71,434.00 214,302.00
PEKERJAAN CAT
Cat dinding M2 412.42 56,952.00 23,488,143.84
Cat plafond M2 211.16 56,952.00 12,025,984.32
Pengecatan Kosen Pintu/Jendela/Vetilasi M2 3.08 66,154.00 203,754.32
PEKERJAAN INSTALASI LISTRIK
Instalasi listrik Titik 12.00 1,178,543.00 14,142,516.00
Stop kontak merk brocco Bh 6.00 95,000.00 570,000.00
MCB komplit Unit 1.00 350,000.00 350,000.00
Lampu TL Bulat 10 watt bH 12.00 175,000.00 2,100,000.00
Lampu philps 20 watt bH 6.00 245,000.00 1,470,000.00
BANGUN RUANG KEPALA SEKOLAH
PEKERJAAN PERSIAPAN
Pengukuran dan pemasangan bouwplank Ls 1.00 2,500,000.00 2,500,000.00
Pekerjaan Pembongkaran pembersihan Lokasi Pekerjaan Ls 1.00 15,000,000.00 15,000,000.00
PEKERJAAN TANAH
Galian Tanah Pondasi M3 24.00 103,812.00 2,491,488.00
Urugan Tanah Kembali (Ex galian) M3 7.35 37,812.00 277,918.20
Urugan Pasir Bawah Pondasi M3 2.40 576,125.00 1,382,700.00
Urugan Pasir Bawah Lantai M3 14.40 576,125.00 8,296,200.00
PEKERJAAN PASANGAN
Pasangan pondasi batu kali 1 4 M3 9.45 1,420,457.00 13,423,318.65
Pasangan batu kosong (anstamping) M3 4.80 915,073.00 4,392,350.40
Pasangan dinding batu bata camp. 1 4 M2 96.52 215,149.00 20,766,181.48
PEKERJAAN PLESTERAN
Plesteran dinding camp. 1 4 M2 193.04 89,598.00 17,295,997.92
Pekerjaan Acian Dinding M2 193.04 50,902.00 9,826,122.08
PEKERJAAN BETON
Sloof Beton utama 15/20 (177.12 kg/m3) M3 1.50 5,462,224.49 8,193,336.73
Kolom Beton Utama 15/20 (177.12 kg/m3) M3 1.19 5,583,911.49 6,644,854.67
Kolom Praktis 15/15 (224.45 kg/m3) M3 0.23 6,535,757.69 1,503,224.27
Balok 15/20 (177.12 kg/m3) M3 1.50 5,592,326.49 8,388,489.73
PEKERJAAN ATAP BAJA RINGAN DAN PLAFON
Kuda-kuda Baja Ringan (Canal C 75/100) M2 101.70 364,943.00 37,114,703.10
Atap Genteng Metal M1 101.70 260,452.00 26,487,968.40
Bumbungan Atap Genteng M1 9.00 140,827.00 1,267,443.00
Rangka plafond kayu Kls II M3 41.40 130,009.00 5,382,372.60
Plafond tripleks 3 mm M2 82.80 99,500.00 8,238,600.00
List plafond kayu M1 40.00 79,211.00 3,168,440.00
Balok bubungan kayu Kls II M1 9.00 140,827.00 1,267,443.00
Papan listplank doubel kayu Kls I M1 30.00 132,907.00 3,987,210.00
PEKERJAAN LANTAI DAN KERAMIK
Rabat beton 135 t = 5 cm M1 2.65 1,390,622.00 3,685,148.30
Lantai tegel keramik 30/30 cm M2 52.99 215,957.00 11,443,561.43
Plint Tegel dalam Ruangan M 3.60 37,903.00 136,450.80
Lantai keramik 30x30 cm (teras) Ls 17.07 215,957.00 3,686,385.99
PEKERJAAN PINTU DAN JENDELA
Kusen pintu, jendela, ventilasi kayu kls I m3 1.54 13,052,187.00 20,100,367.98
Daun pintu panel kayu kls I m2 1.40 991,375.00 1,387,925.00
Daun jendela kaca 4 mm bingkai kayu kls I m2 6.38 722,150.00 4,607,317.00
Engsel jendela bh 24.00 53,666.00 1,287,984.00
Engsel pintu bh 4.00 71,434.00 285,736.00
Grandel jendela bh 12.00 76,546.00 918,552.00
Grandel pintu bh 1.00 76,546.00 76,546.00
Kunci pintu 2 slaag bh 1.00 492,497.00 492,497.00
Grendel tanam pintu bh 1.00 71,434.00 71,434.00
PEKERJAAN CAT
Cat dinding m3 193.04 56,952.00 10,994,014.08
Cat plafond m2 70.06 56,952.00 3,990,057.12
Pengecatan Kosen Pintu/Jendela/Vetilasi m2 3.08 66,154.00 203,754.32
PEKERJAAN INSTALASI LISTRIK
Instalasi listrik Ttk 4.00 1,178,543.00 4,714,172.00
Stop kontak merk brocco Ttk 2.00 95,000.00 190,000.00
MCB komplit Bh 1.00 350,000.00 350,000.00
Lampu TL Bulat 23 watt Bh 4.00 175,000.00 700,000.00
Lampu philps 23 watt Bh 2.00 245,000.00 490,000.00
BANGUN RUANG UKS & TEMPAT IBADAH
PEKERJAAN PERSIAPAN
Pengukuran dan pemasangan bouwplank Ls 1.00 2,500,000.00 2,500,000.00
Pekerjaan Pembongkaran pembersihan Lokasi Pekerjaan Ls 1.00 15,000,000.00 15,000,000.00
PEKERJAAN TANAH
Galian Tanah Pondasi m3 33.60 103,812.00 3,488,083.20
Urugan Tanah Kembali (Ex galian) m3 10.29 37,812.00 389,085.48
Urugan Pasir Bawah Pondasi m3 3.36 576,125.00 1,935,780.00
Urugan material urug di bawah Lantai m3 22.40 576,125.00 12,905,200.00
PEKERJAAN PASANGAN
Pasangan pondasi batu kali 1 4 m3 13.23 1,420,457.00 18,792,646.11
Pasangan batu kosong (anstamping) m3 6.72 915,073.00 6,149,290.56
Pasangan dinding batu bata camp. 1 4 m2 116.45 215,149.00 25,054,101.05
PEKERJAAN PLESTERAN
Plesteran dinding camp. 1 4 m2 232.91 89,598.00 20,868,270.18
Pekerjaan Acian Dinding m2 232.91 50,902.00 11,855,584.82
PEKERJAAN BETON
Sloof Beton utama 15/20 (177.12 kg/m3) m3 1.86 5,462,224.49 10,159,737.54
Kolom Beton Utama 15/20 (177.12 kg/m3) m3 1.19 5,583,911.49 6,644,854.67
Kolom Praktis 15/15 (224.45 kg/m3) m3 0.23 6,535,757.69 1,503,224.27
Balok 15/20 (177.12 kg/m3) m3 1.64 5,592,326.49 9,171,415.44
PEKERJAAN ATAP BAJA RINGAN DAN PLAFON
Kuda-kuda Baja Ringan (Canal C 75/100) m3 8.90 364,943.00 3,247,992.70
Atap Genteng Metal m2 101.70 260,452.00 26,487,968.40
Bumbungan Atap Genteng m 9.00 140,827.00 1,267,443.00
Rangka plafond kayu Kls II m2 46.45 130,009.00 6,038,918.05
Plafond tripleks 3 mm m2 92.90 99,500.00 9,243,550.00
List plafond kayu m 50.00 79,211.00 3,960,550.00
Balok bubungan kayu Kls II m 9.00 140,827.00 1,267,443.00
Papan listplank doubel kayu Kls I m 30.00 132,907.00 3,987,210.00
PEKERJAAN LANTAI DAN KERAMIK
Rabat beton 135 t = 5 cm m3 3.21 1,390,622.00 4,463,896.62
Lantai tegel keramik 30/30 cm m2 64.24 215,957.00 13,873,077.68
Plint Tegel dalam Ruangan m1 30.00 37,903.00 1,137,090.00
Lantai keramik 30x30 cm (teras) m2 17.07 215,957.00 3,686,385.99
PEKERJAAN PINTU DAN JENDELA
Kusen pintu, jendela, ventilasi kayu kls I m3 1.54 13,052,187.00 20,100,367.98
Daun pintu panel kayu kls I m2 1.40 991,375.00 1,387,925.00
Daun jendela kaca 4 mm bingkai kayu kls I m2 6.38 722,150.00 4,607,317.00
Engsel jendela bh 24.00 53,666.00 1,287,984.00
Engsel pintu bh 4.00 71,434.00 285,736.00
Grandel jendela bh 12.00 76,546.00 918,552.00
Grandel pintu bh 1.00 76,546.00 76,546.00
Kunci pintu 2 slaag bh 1.00 492,497.00 492,497.00
Grendel tanam pintu bh 1.00 71,434.00 71,434.00
PEKERJAAN CAT
Cat dinding m2 232.91 56,952.00 13,264,690.32
Cat plafond m2 92.90 56,952.00 5,290,840.80
Pengecatan Kosen Pintu/Jendela/Vetilasi m2 3.08 66,154.00 203,754.32
PEKERJAAN INSTALASI LISTRIK
Instalasi listrik ttk 4.00 1,178,543.00 4,714,172.00
Stop kontak merk brocco bh 2.00 95,000.00 190,000.00
MCB komplit unit 1.00 350,000.00 350,000.00
Lampu TL Bulat 23 watt Unit 4.00 175,000.00 700,000.00
Lampu philps 23 watt bh 2.00 245,000.00 490,000.00
BANGUN SITE DEVELOMENT
PEKERJAAN PERSIAPAN
Pengukuran dan pemasangan bouwplank Ls 1.00 2,000,000.00 2,000,000.00
Pekerjaan Pembongkaran pembersihan Lokasi Pekerjaan Ls 1.00 5,000,000.00 5,000,000.00
Papan Nama Proyek Ls 1.00 250,000.00 250,000.00
PEKERJAAN PEMBUATAN LAPANGAN BULU TANGKIS
PEKERJAAN TANAH
Rabat beton 1 3 5 m3 25.20 1,390,622.00 35,043,674.40
Pengecatan m2 96.00 56,952.00 5,467,392.00
pembuatan tiang net bh 2.00 3,500,000.00 7,000,000.00
PEKERJAAN SELASAR ANTAR BANGUNAN
PEKERJAAN TANAH
Galian Tanah m3 3.50 103,812.00 363,342.00
Urugan Pasir m3 4.80 576,125.00 2,765,400.00
Rabat beton 1 3 5 m3 8.97 1,390,622.00 12,473,879.34
PEKERJAAN SALURAN KELILING LINGKUNGAN
PEKERJAAN TANAH
Galian Tanah m3 20.25 103,812.00 2,102,193.00
Pasangan batu kali m3 8.00 1,420,457.00 11,363,656.00
Rabat beton 1 3 5 m3 1.50 1,390,622.00 2,085,933.00
Plesteran m2 60.00 89,598.00 5,375,880.00
PEKERJAAN TAMAN BERMAIN ANAK
Pengadaan Gasebo unit 7.00 35,000,000.00 245,000,000.00
Pengadaan Ayunan unit 4.00 7,500,000.00 30,000,000.00
Pengadaan seluncur unit 4.00 7,500,000.00 30,000,000.00
PEKERJAAN LAPANGAN UPACARA
Galian Tanah M3 18.99 103,812.00 1,971,389.88
Rabat beton 1 3 5 M3 18.99 1,390,622.00 26,407,911.78
Plesteran M2 379.75 89,598.00 34,024,840.50
Pemasangan Paving Blok M2 150.00 335,123.00 50,268,450.00
BANGUN PAGAR KELILING
PEKERJAAN PERSIAPAN
Pengukuran dan pemasangan bouwplank Ls 1.00 2,000,000.00 2,000,000.00
Pekerjaan Pembongkaran pembersihan Lokasi Pekerjaan Ls 1.00 5,000,000.00 5,000,000.00
PEKERJAAN TANAH
Galian Tanah Pondasi m3 11.25 103,812.00 1,167,885.00
Urugan Tanah Kembali (Ex galian) m3 3.75 37,812.00 141,795.00
Urugan Pasir Bawah Pondasi m3 15.00 576,125.00 8,641,875.00
PEKERJAAN PASANGAN
Pasangan pondasi batu kali 1 4 m3 15.00 1,420,457.00 21,306,855.00
Pasangan batu kosong (anstamping) m3 3.75 915,073.00 3,431,523.75
Pasangan dinding pagar depan batu bata camp. 1 4 m2 65.63 215,149.00 14,120,228.87
Pasangan dinding pagar samping batu bata camp. 1 4 m2 162.50 215,149.00 34,961,712.50
LAIN - LAIN
Pas. Saluran Kel. Bangunan m1 18.00 235,500.00 4,239,000.00
Rabat Beton Kel Bangunan 1 3 5 m3 5.95 1,390,622.00 8,274,200.90
Pas. Pipa PVC 4 Saluran Air Kotor m1 10.00 200,799.00 2,007,990.00
Pas. Pipa PVC 3/4 Saluran Air Bersih m1 14.50 43,994.00 637,913.00
Pas. Kran Air 3/4 Bh 8.00 80,863.00 646,904.00
Floor Drain Bh 5.00 277,282.00 1,386,410.00
Pas. Bak Air unit 2.00 2,250,000.00 4,500,000.00
Pas. Kloset Duduk unit 2.00 3,837,900.00 7,675,800.00
Pas. Wastavel unit 2.00 2,127,741.00 4,255,482.00
Pas Setictank + Rembesan unit 1.00 7,500,000.00 7,500,000.00
Pas Anti Rayap Ls 1.00 29,250,000.00 29,250,000.00
PEKERJAAN AKHIR
Dokumentasi dan Pelaporan Ls 1.00 2,500,000.00 2,500,000.00
As Built Drawing Ls 1.00 3,500,000.00 3,500,000.00
Pembersihan Akhir Ls 1.00 1,500,000.00 1,500,000.00
PEKERJAAN PENGADAAN K3
Alat Pelindung Diri (APD)
Topi Pelindung (Safet Helmet) Bh 45.00 115,000.00 5,175,000.00
Pelindung Pernapasan Pcs 90.00 10,000.00 900,000.00
Sarung Tangan (Safety) Pcs 90.00 10,000.00 900,000.00
Sepatu tangan (Safety Lars) Bh 45.00 225,000.00 10,125,000.00
Rompi Keselamatan (Sefety Vast Bh 90.00 85,000.00 7,650,000.00
Sabuk Keselamatan (Sefety Belt) Bh 45.00 45,000.00 2,025,000.00
Fasilitas Sarana Kesehatan
P3K Set 1.00 3,500,000.00 3,500,000.00
DAFTAR KUANTITAS DAN HARGA

KEGIATAN : REHABILITASI DAN RENOVASI SARANA PRASARANA SEKOLAH


PEKERJAAN : REHABILITASI DAN RENOVASI SARANA PRASARANA SEKOLAH SD NEGERI TONETANAH
LOKASI : SD NEGERI TONETANAH
T.ANGGARAN : 2019

TOTAL HARGA
NO URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN (Rp.)
(Rp.)

SD NEGERI TONETANAH
BANGUN 3 RUANG KELAS
PEKERJAAN PERSIAPAN/UMUM
Pengukuran dan pemasangan bouwplank Ls 1.00 2,500,000.00 2,500,000.00
Pekerjaan Pembongkaran pembersihan Lokasi Pekerjaan Ls 1.00 15,000,000.00 15,000,000.00
PEKERJAAN LANTAI I
PEKERJAAN TANAH
Galian Tanah Pondasi m3 86.40 103,812.00 8,969,356.80
Urugan Tanah Kembali (Ex galian) m3 26.46 37,812.00 1,000,505.52
Urugan Pasir Bawah Pondasi m3 8.64 576,125.00 4,977,720.00
Urugan material urug di bawah Lantai m3 67.20 348,012.00 23,386,406.40
PEKERJAAN PASANGAN
Pasangan pondasi batu kali 1 4 m3 34.02 1,420,457.00 48,323,947.14
Pasangan batu kosong (anstamping) m3 17.28 915,073.00 15,812,461.44
Pasangan dinding batu bata camp. 1 4 m2 206.21 215,149.00 44,365,875.29
PEKERJAAN PLESTERAN
Plesteran dinding camp. 1 4 m2 412.42 89,598.00 36,952,007.16
Pekerjaan Acian Dinding m2 412.42 50,902.00 20,993,002.84
PEKERJAAN BETON
Sloof Beton utama 15/20 (177.12 kg/m3) m3 4.76 5,462,224.49 26,000,188.55
Kolom Beton Utama 15/20 (177.12 kg/m3) m3 2.89 5,583,911.49 16,137,504.19
Kolom Praktis 15/15 (224.45 kg/m3) m3 0.51 6,535,757.69 3,333,236.42
Balok 15/20 (177.12 kg/m3) m3 3.50 5,592,326.49 19,573,142.70
PEKERJAAN ATAP DAN PLAFOND
Kuda-kuda Baja Ringan (Canal C 75/100) m2 245.00 364,943.00 89,411,035.00
Atap Genteng Metal m2 245.00 260,452.00 63,810,740.00
Bumbungan Atap Genteng m 26.60 140,827.00 3,745,998.20
Rangka plafond kayu Kls II m2 141.27 130,009.00 18,366,371.43
Plafond tripleks 3 mm m2 282.54 99,500.00 28,112,730.00
List plafond kayu m 75.00 79,211.00 5,940,825.00
Balok bubungan kayu Kls II m 26.60 140,827.00 3,745,998.20
Papan listplank doubel kayu Kls I m 78.60 132,907.00 10,446,490.20
PEK. LANTAI & KERAMIK
Rabat beton 135 t = 5 cm m3 7.95 1,390,622.00 11,055,444.90
Lantai tegel keramik 30/30 cm m2 158.96 215,957.00 34,328,524.72
Plint Tegel dalam Ruangan m1 10.48 37,903.00 397,223.44
Lantai keramik 30x30 cm (teras) m2 52.20 215,957.00 11,272,955.40
PEKERJAAN PINTU DAN JENDELA
Kusen pintu, jendela, ventilasi kayu kls I m3 1.54 13,052,187.00 20,100,367.98
Daun pintu panel kayu kls I m2 4.20 991,375.00 4,163,775.00
Daun jendela kaca 4 mm bingkai kayu kls I m2 92.16 722,150.00 66,553,344.00
Engsel jendela bh 24.00 53,666.00 1,287,984.00
Engsel pintu bh 6.00 71,434.00 428,604.00
Grandel jendela bh 12.00 76,546.00 918,552.00
Grandel pintu bh 3.00 76,546.00 229,638.00
Kunci pintu 2 slaag bh 3.00 492,497.00 1,477,491.00
Grendel tanam pintu bh 3.00 71,434.00 214,302.00
PEKERJAAN CAT
Cat dinding m2 412.42 56,952.00 23,488,143.84
Cat plafond m2 211.16 56,952.00 12,025,984.32
Pengecatan Kosen Pintu/Jendela/Vetilasi m2 3.08 66,154.00 203,754.32
PEKERJAAN INSTALASI LISTRIK
Instalasi listrik ttk 12.00 1,178,543.00 14,142,516.00
Stop kontak merk brocco bh 6.00 95,000.00 570,000.00
MCB komplit Unit 1.00 350,000.00 350,000.00
Lampu TL Bulat 10 watt Unit 12.00 175,000.00 2,100,000.00
Lampu philps 20 watt bh 6.00 245,000.00 1,470,000.00
BANGUN RUANG PERPUTAKAAN
PEKERJAAN PERSIAPAN/UMUM
Pengukuran dan pemasangan bouwplank Ls 1.00 2,500,000.00 2,500,000.00
Pekerjaan Pembongkaran pembersihan Lokasi Pekerjaan Ls 1.00 15,000,000.00 15,000,000.00
Papan Nama Proyek Ls 1.00 250,000.00 250,000.00
PEKERJAAN LANTAI I
PEKERJAAN TANAH
Galian Tanah Pondasi m3 35.20 103,812.00 3,654,182.40
Urugan Tanah Kembali (Ex galian) m3 10.78 37,812.00 407,613.36
Urugan Pasir Bawah Pondasi m3 3.52 576,125.00 2,027,960.00
Urugan material urug di bawah Lantai m3 42.00 348,012.00 14,616,504.00
PEKERJAAN PASANGAN
Pasangan pondasi batu kali 1 4 m3 13.86 1,420,457.00 19,687,534.02
Pasangan batu kosong (anstamping) m3 7.04 915,073.00 6,442,113.92
Pasangan dinding batu bata camp. 1 4 m2 116.45 215,149.00 25,054,101.05
PEKERJAAN PLESTERAN
Plesteran dinding camp. 1 4 m2 232.90 89,598.00 20,867,374.20
Pekerjaan Acian Dinding m2 232.90 50,902.00 11,855,075.80
PEKERJAAN BETON
Sloof Beton utama 15/20 (177.12 kg/m3) m3 1.32 5,462,224.49 7,210,136.32
Kolom Beton Utama 15/20 (177.12 kg/m3) m3 1.36 5,583,911.49 7,594,119.62
Kolom Praktis 15/15 (224.45 kg/m3) m3 0.75 6,535,757.69 4,901,818.27
Balok 15/20 (177.12 kg/m3) m3 1.64 5,592,326.49 9,171,415.44
PEKERJAAN ATAP DAN PLAFOND
Kuda-kuda Baja Ringan (Canal C 75/100) m2 125.00 364,943.00 45,617,875.00
Atap Genteng Metal m2 125.00 260,452.00 32,556,500.00
Bumbungan Atap Genteng m 17.00 140,827.00 2,394,059.00
Rangka plafond kayu Kls II m2 52.04 130,009.00 6,765,668.36
Plafond tripleks 3 mm m2 156.12 99,500.00 15,533,940.00
List plafond kayu m 45.00 79,211.00 3,564,495.00
Balok bubungan kayu Kls II m 17.00 140,827.00 2,394,059.00
Papan listplank doubel kayu Kls I m 45.00 132,907.00 5,980,815.00
PEK. LANTAI & KERAMIK
Rabat beton 135 t = 5 cm m3 5.09 1,390,622.00 7,078,265.98
Lantai tegel keramik 30/30 cm m2 101.72 215,957.00 21,967,146.04
Plint Tegel dalam Ruangan m1 4.20 37,903.00 159,192.60
Lantai keramik 30x30 cm (teras) m2 30.00 215,957.00 6,478,710.00
PEKERJAAN PINTU DAN JENDELA
Kusen pintu, jendela, ventilasi kayu kls I m3 1.54 13,052,187.00 20,100,367.98
Daun pintu panel kayu kls I m2 1.40 991,375.00 1,387,925.00
Daun jendela kaca 4 mm bingkai kayu kls I m2 6.38 722,150.00 4,607,317.00
Engsel jendela bh 24.00 53,666.00 1,287,984.00
Engsel pintu bh 4.00 71,434.00 285,736.00
Grandel jendela bh 12.00 76,546.00 918,552.00
Grandel pintu bh 1.00 76,546.00 76,546.00
Kunci pintu 2 slaag bh 1.00 492,497.00 492,497.00
Grendel tanam pintu bh 1.00 71,434.00 71,434.00
PEKERJAAN CAT
Cat dinding m2 232.90 56,952.00 13,264,120.80
Cat plafond m2 131.72 56,952.00 7,501,717.44
Pengecatan Kosen Pintu/Jendela/Vetilasi m2 3.08 66,154.00 203,754.32
PEKERJAAN INSTALASI LISTRIK
Instalasi listrik ttk 4.00 1,178,543.00 4,714,172.00
Stop kontak merk brocco bh 2.00 95,000.00 190,000.00
MCB komplit Unit 1.00 350,000.00 350,000.00
Lampu TL Bulat 20 watt Unit 4.00 175,000.00 700,000.00
Lampu philps 20 watt bh 2.00 245,000.00 490,000.00
SITE DEVELOPMENT
PEKERJAAN PERSIAPAN/UMUM
Pengukuran dan pemasangan bouwplank Ls 1.00 2,000,000.00 2,000,000.00
Pekerjaan Pembongkaran pembersihan Lokasi Pekerjaan Ls 1.00 5,000,000.00 5,000,000.00
Papan Nama Proyek Ls 1.00 250,000.00 250,000.00
PEKERJAAN PEMBUATAN LAPANGAN BULU TANGKIS
PEKERJAAN TANAH
Rabat beton 1 3 5 m3 25.20 1,390,622.00 35,043,674.40
Pengecatan m2 96.00 56,952.00 5,467,392.00
pembuatan tiang net bh 2.00 3,500,000.00 7,000,000.00
PEKERJAAN SELASAR ANTAR BANGUNAN
Galian Tanah m3 3.50 103,812.00 363,342.00
Urugan Pasir m3 4.80 576,125.00 2,765,400.00
Rabat beton 1 3 5 m3 8.97 1,390,622.00 12,473,879.34
PEKERJAAN SALURAN KELILING LINGKUNGAN
Galian Tanah m3 10.13 103,812.00 1,051,615.56
Pasangan batu kali Ad 1 4 m2 4.00 1,420,457.00 5,681,828.00
Rabat beton 1 3 5 m3 0.75 1,390,622.00 1,042,966.50
Plesteran m2 30.00 89,598.00 2,687,940.00
PEKERJAAN TAMAN BERMAIN ANAK
Pengadaan Gasebo unit 4.00 35,000,000.00 140,000,000.00
Pengadaan Ayunan unit 2.00 7,500,000.00 15,000,000.00
Pengadaan seluncur unit 2.00 7,500,000.00 15,000,000.00
PEKERJAAN LAPANGAN UPACARA
Galian Tanah m3 15.00 103,812.00 1,557,180.00
Rabat beton 1 3 5 m3 15.00 1,390,622.00 20,859,330.00
Plesteran m2 300.00 89,598.00 26,879,400.00
Ppemasangan paving blok m2 150.00 335,123.00 50,268,450.00
PEMBANGUNAN PAGAR KELILING
PEKERJAAN PERSIAPAN/UMUM
Pengukuran dan pemasangan bouwplank Ls 1.00 2,000,000.00 2,000,000.00
Pekerjaan Pembongkaran pembersihan Lokasi Pekerjaan Ls 1.00 5,000,000.00 5,000,000.00
Papan Nama Proyek Ls 1.00 250,000.00 250,000.00
PEKERJAAN TANAH
PEKERJAAN TANAH
Galian Tanah Pondasi m3 16.00 103,812.00 1,660,992.00
Urugan Tanah Kembali (Ex galian) m3 5.33 37,812.00 201,537.96
Urugan Pasir Bawah Pondasi m3 2.00 576,125.00 1,152,250.00
PEKERJAAN PASANGAN
Pasangan pondasi batu kali 1 4 m3 12.00 1,420,457.00 17,045,484.00
Pasangan batu kosong (anstamping) m3 4.00 915,073.00 3,660,292.00
Pasangan dinding pagar depan batu bata camp. 1 4 m2 52.50 215,149.00 11,295,322.50
Pasangan dinding pagar samping batu bata camp. 1 4 m2 130.00 215,149.00 27,969,370.00
Anti Rayap Ls 1.00 29,250,000.00 29,250,000.00
PEKERJAAN AKHIR
Dokumentasi dan Pelaporan Ls 1.00 2,500,000.00 2,500,000.00
As Built Drawing Ls 1.00 3,500,000.00 3,500,000.00
Pembersihan Akhir Ls 1.00 1,500,000.00 1,500,000.00
PEKERJAAN PENGADAAN K3
Alat Pelindung Diri (APD)
Topi Pelindung (Safet Helmet) Bh 45.00 115,000.00 5,175,000.00
Pelindung Pernapasan Pcs 90.00 10,000.00 900,000.00
Sarung Tangan (Safety) Pcs 90.00 10,000.00 900,000.00
Sepatu tangan (Safety Lars) Bh 45.00 225,000.00 10,125,000.00
Rompi Keselamatan (Sefety Vast Bh 90.00 85,000.00 7,650,000.00
Sabuk Keselamatan (Sefety Belt) Bh 45.00 45,000.00 2,025,000.00
Fasilitas Sarana Kesehatan
P3K Set 1.00 3,500,000.00 3,500,000.00
DAFTAR KUANTITAS DAN HARGA

KEGIATAN : REHABILITASI DAN RENOVASI SARANA PRASARANA SEKOLAH


PEKERJAAN : REHABILITASI DAN RENOVASI SARANA PRASARANA SEKOLAH SMPN 4 TELUK ELPAPUTIH
LOKASI : SMPN 4 TELUK ELPAPUTIH
T.ANGGARAN : 2019

NO URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN TOTAL HARGA (Rp.)


(Rp.)

SMPN 4 TELUK ELPAPUTIH


BANGUN 3 RUANG KELAS
PEKERJAAN PERSIAPAN/UMUM
Pengukuran dan pemasangan bouwplank Ls 1.00 2,500,000.00 2,500,000.00
Pekerjaan Pembongkaran pembersihan Lokasi Pekerjaan Ls 1.00 15,000,000.00 15,000,000.00
PEKERJAAN LANTAI I
PEKERJAAN TANAH
Galian Tanah Pondasi m3 86.40 103,812.00 8,969,356.80
Urugan Tanah Kembali (Ex galian) m3 26.46 37,812.00 1,000,505.52
Urugan Pasir Bawah Pondasi m3 8.64 576,125.00 4,977,720.00
Urugan material urug di bawah Lantai m3 67.20 348,012.00 23,386,406.40
PEKERJAAN PASANGAN
Pasangan pondasi batu kali 1 4 m3 34.02 1,420,457.00 48,323,947.14
Pasangan batu kosong (anstamping) m3 17.28 915,073.00 15,812,461.44
Pasangan dinding batu bata camp. 1 4 m2 206.21 215,149.00 44,365,875.29
PEKERJAAN PLESTERAN
Plesteran dinding camp. 1 4 m2 412.42 89,598.00 36,952,007.16
Pekerjaan Acian Dinding m2 412.42 50,902.00 20,993,002.84
PEKERJAAN BETON
Sloof Beton utama 15/20 (177.12 kg/m3) m3 4.76 5,462,224.49 26,000,188.55
Kolom Beton Utama 15/20 (177.12 kg/m3) m3 2.89 5,583,911.49 16,137,504.19
Kolom Praktis 15/15 (224.45 kg/m3) m3 0.51 6,535,757.69 3,333,236.42
Balok 15/20 (177.12 kg/m3) m3 3.50 5,592,326.49 19,573,142.70
PEKERJAAN ATAP BAJA RINGAN DAN PLAFOND
Kuda-kuda Baja Ringan (Canal C 75/100) m3 245.00 364,943.00 89,411,035.00
Atap Genteng Metal m2 245.00 260,452.00 63,810,740.00
Bumbungan Atap Genteng m 26.60 140,827.00 3,745,998.20
Rangka plafond kayu Kls II m2 141.27 130,009.00 18,366,371.43
Plafond tripleks 3 mm m2 282.54 99,500.00 28,112,730.00
List plafond kayu m 75.00 79,211.00 5,940,825.00
Balok bubungan kayu Kls II m 26.60 140,827.00 3,745,998.20
Papan listplank doubel kayu Kls I m 78.60 132,907.00 10,446,490.20
PEK. LANTAI & KERAMIK
Rabat beton 135 t = 5 cm m3 7.95 1,390,622.00 11,055,444.90
Lantai tegel keramik 30/30 cm m2 158.96 215,957.00 34,328,524.72
Plint Tegel dalam Ruangan m1 10.48 37,903.00 397,223.44
Lantai keramik 30x30 cm (teras) m2 52.20 215,957.00 11,272,955.40
PEKERJAAN PINTU DAN JENDELA
Kusen pintu, jendela, ventilasi kayu kls I m3 1.54 13,052,187.00 20,100,367.98
Daun pintu panel kayu kls I m2 4.20 991,375.00 4,163,775.00
Daun jendela kaca 4 mm bingkai kayu kls I m2 92.16 722,150.00 66,553,344.00
Engsel jendela bh 24.00 53,666.00 1,287,984.00
Engsel pintu bh 6.00 71,434.00 428,604.00
Grandel jendela bh 12.00 76,546.00 918,552.00
Grandel pintu bh 3.00 76,546.00 229,638.00
Kunci pintu 2 slaag bh 3.00 492,497.00 1,477,491.00
Grendel tanam pintu bh 3.00 71,434.00 214,302.00
PEKERJAAN CAT
Cat dinding m2 412.42 56,952.00 23,488,143.84
Cat plafond m2 211.16 56,952.00 12,025,984.32
Pengecatan Kosen Pintu/Jendela/Vetilasi m2 3.08 66,154.00 203,754.32
PEKERJAAN INSTALASI LISTRIK
Instalasi listrik ttk 12.00 1,178,543.00 14,142,516.00
Stop kontak merk brocco bh 6.00 95,000.00 570,000.00
MCB komplit Unit 1.00 350,000.00 350,000.00
Lampu TL Bulat 10 watt Unit 12.00 175,000.00 2,100,000.00
Lampu philps 20 watt bh 6.00 245,000.00 1,470,000.00
BANGUN RUANG PERPUTAKAAN
PEKERJAAN PERSIAPAN/UMUM
Pengukuran dan pemasangan bouwplank Ls 1.00 2,500,000.00 2,500,000.00
Pekerjaan Pembongkaran pembersihan Lokasi Pekerjaan Ls 1.00 15,000,000.00 15,000,000.00
PEKERJAAN LANTAI I
PEKERJAAN TANAH
Galian Tanah Pondasi m3 35.20 103,812.00 3,654,182.40
Urugan Tanah Kembali (Ex galian) m3 10.78 37,812.00 407,613.36
Urugan Pasir Bawah Pondasi m3 3.52 576,125.00 2,027,960.00
Urugan material urug di bawah Lantai m3 25.00 348,012.00 8,700,300.00
PEKERJAAN PASANGAN
Pasangan pondasi batu kali 1 4 m3 13.86 1,420,457.00 19,687,534.02
Pasangan batu kosong (anstamping) m3 7.04 915,073.00 6,442,113.92
Pasangan dinding batu bata camp. 1 4 m2 75.00 215,149.00 16,136,175.00
PEKERJAAN PLESTERAN
Plesteran dinding camp. 1 4 m2 150.00 89,598.00 13,439,700.00
Pekerjaan Acian Dinding m2 150.00 50,902.00 7,635,300.00
PEKERJAAN BETON
Sloof Beton utama 15/20 (177.12 kg/m3) m3 1.32 5,462,224.49 7,210,136.32
Kolom Beton Utama 15/20 (177.12 kg/m3) m3 1.36 5,583,911.49 7,594,119.62
Kolom Praktis 15/15 (224.45 kg/m3) m3 0.75 6,535,757.69 4,901,818.27
Balok 15/20 (177.12 kg/m3) m3 1.64 5,592,326.49 9,171,415.44
PEKERJAAN ATAP DAN PLAFOND
Kuda-kuda Baja Ringan (Canal C 75/100) m3 125.00 364,943.00 45,617,875.00
Atap Genteng Metal m2 125.00 260,452.00 32,556,500.00
Bumbungan Atap Genteng m 17.00 140,827.00 2,394,059.00
Rangka plafond kayu Kls II m2 33.33 130,009.00 4,333,199.97
Plafond tripleks 3 mm m2 100.00 99,500.00 9,950,000.00
List plafond kayu m 45.00 79,211.00 3,564,495.00
Balok bubungan kayu Kls II m 17.00 140,827.00 2,394,059.00
Papan listplank doubel kayu Kls I m 45.00 132,907.00 5,980,815.00
PEK. LANTAI & KERAMIK
Rabat beton 135 t = 5 cm m3 5.09 1,390,622.00 7,078,265.98
Lantai tegel keramik 30/30 cm m2 101.72 215,957.00 21,967,146.04
Plint Tegel dalam Ruangan m1 4.20 37,903.00 159,192.60
Lantai keramik 30x30 cm (teras) m2 30.00 215,957.00 6,478,710.00
PEKERJAAN PINTU DAN JENDELA
Kusen pintu, jendela, ventilasi kayu kls I m3 1.54 13,052,187.00 20,100,367.98
Daun pintu panel kayu kls I m2 1.40 991,375.00 1,387,925.00
Daun jendela kaca 4 mm bingkai kayu kls I m2 6.38 722,150.00 4,607,317.00
Engsel jendela bh 24.00 53,666.00 1,287,984.00
Engsel pintu bh 4.00 71,434.00 285,736.00
Grandel jendela bh 12.00 76,546.00 918,552.00
Grandel pintu bh 1.00 76,546.00 76,546.00
Kunci pintu 2 slaag bh 1.00 492,497.00 492,497.00
Grendel tanam pintu bh 1.00 71,434.00 71,434.00
PEKERJAAN CAT
Cat dinding m2 150.00 56,952.00 8,542,800.00
Cat plafond m2 131.72 56,952.00 7,501,717.44
Pengecatan Kosen Pintu/Jendela/Vetilasi m2 3.08 66,154.00 203,754.32
PEKERJAAN INSTALASI LISTRIK
Instalasi listrik ttk 4.00 1,178,543.00 4,714,172.00
Stop kontak merk brocco bh 2.00 95,000.00 190,000.00
MCB komplit Unit 1.00 350,000.00 350,000.00
Lampu TL Bulat 10 watt Unit 4.00 175,000.00 700,000.00
Lampu philps 20 watt bh 2.00 245,000.00 490,000.00
SITE DEVELOPMENT
PEKERJAAN PERSIAPAN/UMUM
Pengukuran dan pemasangan bouwplank Ls 1.00 2,000,000.00 2,000,000.00
Pekerjaan Pembongkaran pembersihan Lokasi Pekerjaan Ls 1.00 5,000,000.00 5,000,000.00
Papan Nama Proyek Ls 1.00 250,000.00 250,000.00
PEKERJAAN PEMBUATAN LAPANGAN BULU TANGKIS
PEKERJAAN TANAH
Rabat beton 1 3 5 m3 25.20 1,390,622.00 35,043,674.40
Pengecatan m2 96.00 56,952.00 5,467,392.00
pembuatan tiang net bh 2.00 3,500,000.00 7,000,000.00
PEKERJAAN SELASAR ANTAR BANGUNAN
Galian Tanah m3 3.50 103,812.00 363,342.00
Urugan Pasir m3 4.80 576,125.00 2,765,400.00
Rabat beton 1 3 5 m3 8.97 1,390,622.00 12,473,879.34
PEKERJAAN SALURAN KELILING LINGKUNGAN
Galian Tanah m3 10.13 103,812.00 1,051,615.56
Pasangan batu kali m2 4.00 1,420,457.00 5,681,828.00
Rabat beton 1 3 5 m3 0.75 1,390,622.00 1,042,966.50
Plesteran m2 30.00 89,598.00 2,687,940.00
PEKERJAAN TAMAN BERMAIN ANAK
Pengadaan Gasebo unit 7.00 35,000,000.00 245,000,000.00
Pengadaan Ayunan unit 6.00 7,500,000.00 45,000,000.00
Pengadaan seluncur unit 4.00 7,500,000.00 30,000,000.00
PEKERJAAN LAPANGAN UPACARA
Galian Tanah m3 15.00 103,812.00 1,557,180.00
Rabat beton 1 3 5 m3 15.00 1,390,622.00 20,859,330.00
Plesteran m2 300.00 89,598.00 26,879,400.00
Ppemasangan paving blok m2 150.00 335,123.00 50,268,450.00
PEMBANGUNAN PAGAR KELILING
PEKERJAAN PERSIAPAN/UMUM
Pengukuran dan pemasangan bouwplank Ls 1.00 2,000,000.00 2,000,000.00
Pekerjaan Pembongkaran pembersihan Lokasi Pekerjaan Ls 1.00 5,000,000.00 5,000,000.00
PEKERJAAN TANAH
PEKERJAAN TANAH
Galian Tanah Pondasi m3 16.00 103,812.00 1,660,992.00
Urugan Tanah Kembali (Ex galian) m3 5.33 37,812.00 201,537.96
Urugan Pasir Bawah Pondasi m3 2.00 576,125.00 1,152,250.00
PEKERJAAN PASANGAN
Pasangan pondasi batu kali 1 4 m3 12.00 1,420,457.00 17,045,484.00
Pasangan batu kosong (anstamping) m3 4.00 915,073.00 3,660,292.00
Pasangan dinding pagar depan batu bata camp. 1 4 m2 52.50 215,149.00 11,295,322.50
Pasangan dinding pagar samping batu bata camp. 1 4 m2 130.00 215,149.00 27,969,370.00
WC SISWA
PEKERJAAN PERSIAPAN/UMUM
Pengukuran dan pemasangan bouwplank Ls 1.00 2,000,000.00 2,000,000.00
Pekerjaan Pembongkaran pembersihan Lokasi Pekerjaan Ls 1.00 5,000,000.00 5,000,000.00
PEKERJAAN LANTAI I
PEKERJAAN TANAH
Galian Tanah Pondasi m3 28.80 103,812.00 2,989,785.60
Urugan Tanah Kembali (Ex galian) m3 8.82 37,812.00 333,501.84
Urugan Pasir Bawah Pondasi m3 2.88 576,125.00 1,659,240.00
Urugan material urug di bawah Lantai m3 5.40 348,012.00 1,879,264.80
PEKERJAAN PASANGAN
Pasangan pondasi batu kali 1 4 m3 7.00 1,420,457.00 9,943,199.00
Pasangan batu kosong (anstamping) m3 4.00 915,073.00 3,660,292.00
Pasangan dinding batu bata camp. 1 4 m2 58.00 215,149.00 12,478,642.00
PEKERJAAN PLESTERAN
Plesteran dinding camp. 1 4 m2 116.00 89,598.00 10,393,368.00
Pekerjaan Acian Dinding m2 116.00 50,902.00 5,904,632.00
PEKERJAAN BETON
Sloof Beton utama 15/20 (177.12 kg/m3) m3 0.90 5,462,224.49 4,916,002.04
Kolom Beton Utama 15/20 (177.12 kg/m3) m3 0.60 5,583,911.49 3,350,346.89
Kolom Praktis 15/15 (224.45 kg/m3) m3 0.27 6,535,757.69 1,764,654.58
Balok 15/20 (177.12 kg/m3) m3 0.90 5,592,326.49 5,033,093.84
PEKERJAAN ATAP BAJA RINGAN DAN PLAFOND
Kuda-kuda Baja Ringan (Canal C 75/100) m3 30.00 364,943.00 10,948,290.00
Atap Genteng Metal m2 30.00 260,452.00 7,813,560.00
Bumbungan Atap Genteng m 8.00 140,827.00 1,126,616.00
Rangka plafond kayu Kls II m2 26.10 130,009.00 3,393,234.90
Plafond tripleks 3 mm m2 52.20 99,500.00 5,193,900.00
List plafond kayu m 25.00 79,211.00 1,980,275.00
Balok bubungan kayu Kls II m 8.00 140,827.00 1,126,616.00
Papan listplank doubel kayu Kls I m 15.00 132,907.00 1,993,605.00
PEK. LANTAI & KERAMIK
Rabat beton 135 t = 5 cm m3 1.64 1,390,622.00 2,280,620.08
Lantai tegel keramik 30/30 cm m2 32.75 215,957.00 7,072,591.75
Plint Tegel dalam Ruangan m2 3.60 37,903.00 136,450.80
Lantai keramik 30x30 cm (teras) m2 4.50 215,957.00 971,806.50
PEKERJAAN PINTU DAN JENDELA
Kusen pintu, jendela, ventilasi kayu kls I m3 0.73 13,052,187.00 9,528,096.51
Daun pintu panel kayu kls I m2 2.80 991,375.00 2,775,850.00
Engsel pintu bh 6.00 722,150.00 4,332,900.00
Grandel jendela bh 3.00 53,666.00 160,998.00
Grandel pintu bh 1.00 71,434.00 71,434.00
Kunci pintu 2 slaag bh 1.00 76,546.00 76,546.00
Grendel tanam pintu bh 1.00 76,546.00 76,546.00
PEKERJAAN CAT
Cat dinding m2 116.00 56,952.00 6,606,432.00
Cat plafond m2 37.25 56,952.00 2,121,462.00
Pengecatan Kosen Pintu/Jendela/Vetilasi m2 1.46 66,154.00 96,584.84
PEKERJAAN INSTALASI LISTRIK
Instalasi listrik ttk 6.00 1,178,543.00 7,071,258.00
Stop kontak merk brocco bh 4.00 95,000.00 380,000.00
MCB komplit Unit 1.00 350,000.00 350,000.00
Lampu TL Bulat 23 watt Unit 4.00 175,000.00 700,000.00
Lampu philps 23 watt bh 2.00 245,000.00 490,000.00
PEKERJAAN LAIN LAIN
Pas. Saluran Kel. Bangunan m1 18.00 103,812.00 1,868,616.00
Rabat Beton Kel. bangunan 1 3 5 m3 5.95 1,390,622.00 8,274,200.90
Pas. Pipa PVC 4 saluran Air Kotor m1 10.00 200,799.00 2,007,990.00
Pas. Pipa PVC 3/4 Saluran air bersih m1 14.50 43,994.00 637,913.00
Pas. Kran air 3/4 titik 8.00 80,863.00 646,904.00
Floor Drain titik 5.00 277,282.00 1,386,410.00
Pas. Bak Air unit 2.00 2,500,000.00 5,000,000.00
Pas. Klosed Duduk unit 2.00 3,837,900.00 7,675,800.00
Pas. Wastafel unit 2.00 2,127,741.00 4,255,482.00
Pek. Septictank + Rembesan buah 1.00 7,500,000.00 7,500,000.00
Pas. Antirayap Ls 1.00 29,250,000.00 29,250,000.00
PEKERJAAN AKHIR
Dokumentasi dan Pelaporan Ls 1.00 2,500,000.00 2,500,000.00
As Built Drawing Ls 1.00 3,500,000.00 3,500,000.00
Pembersihan Akhir Ls 1.00 1,500,000.00 1,500,000.00
PEKERJAAN PENGADAAN K3
Alat Pelindung Diri (APD)
Topi Pelindung (Safet Helmet) Bh 45.00 115,000.00 5,175,000.00
Pelindung Pernapasan Pcs 90.00 10,000.00 900,000.00
Sarung Tangan (Safety) Pcs 90.00 10,000.00 900,000.00
Sepatu tangan (Safety Lars) Bh 45.00 225,000.00 10,125,000.00
Rompi Keselamatan (Sefety Vast Bh 90.00 85,000.00 7,650,000.00
Sabuk Keselamatan (Sefety Belt) Bh 45.00 45,000.00 2,025,000.00
Fasilitas Sarana Kesehatan
P3K Set 1.00 3,500,000.00 3,500,000.00
DAFTAR KUANTITAS DAN HARGA

KEGIATAN : REHABILITASI DAN RENOVASI SARANA PRASARANA SEKOLAH


PEKERJAAN : REHABILITASI DAN RENOVASI SARANA PRASARANA SEKOLAH SD INPRES HARUKU SAMETH
LOKASI : SD INPRES HARUKU SAMETH
T.ANGGARAN : 2019

NO URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN TOTAL HARGA (Rp.)


(Rp.)

SD INPRES HARUKU SAMETH


REHABILITASI 9 RUANG
PEKERJAAN PEMBONGKARAN
keramik Ls 1.00 1,000,000.00 1,000,000.00
Kusen, Pintu, Jendela dan Ventilasi Ls 1.00 1,000,000.00 1,000,000.00
Plafond Ls 1.00 1,000,000.00 1,000,000.00
Penutup Atap Ls 1.00 1,500,000.00 1,500,000.00
PEKERJAAN PASANGAN DAN PLESTERAN
Pasangan Dinding Batu Alam M2 46.37 587,702.00 27,251,741.74
PEKERJAAN KERAMIK
Lantai Keramik Granit 60 x 60 M2 504.00 502,419.00 253,219,176.00
Pekerjaan Plint Keramik T = 10 Cm M1 81.90 37,903.00 3,104,255.70
PEKERJAAN KUSEN PINTU DAN JENDELA VENTILASI
Kusen Kayu Kls I M3 3.10 13,052,187.00 40,461,779.70
Daun Jendela Kayu Kls I M3 1.86 722,150.00 1,343,199.00
Daun Pintu Panel M3 0.72 991,375.00 713,790.00
Daun Ventilasi Kls I M3 1.05 722,150.00 758,257.50
Kaca Bening M2 14.15 328,669.00 4,650,666.35
PEKERJAAN PLAFOND
Plafond Gipsum Bord M2 702.00 80,327.00 56,389,554.00
Rangka Plafon Kayu Kls II M3 5.79 130,009.00 752,752.11
List Plafon Gipsum M1 270.00 79,211.00 21,386,970.00
PEKERJAAN INSTALASI LISTRIK
Instalasi Lampu Titik 9.00 1,178,543.00 10,606,887.00
Lampu Philip 10 Watt Bh 9.00 175,000.00 1,575,000.00
PEKERJAAN PENGECATAN
Cat Dinding Lama M2 1,267.25 56,952.00 72,172,422.00
Cat plafond M2 702.00 56,952.00 39,980,304.00
PEKERJAAN PENGGANTUNG
Kunci Tanam Dua Slak BH 9.00 492,497.00 4,432,473.00
Engsel Pintu BH 27.00 71,434.00 1,928,718.00
Engsel Jendela/Ventilasi Psg 180.00 53,666.00 9,659,880.00
Hak Angin Stainles Stel Psg 90.00 76,546.00 6,889,140.00
Grendel Jendela Dan Fentilasi Psg 90.00 76,546.00 6,889,140.00
PEKERJAAN ATAP
Atap Senk BJLS 0.25 M2 894.96 124,047.00 111,017,103.12
Rangka Kuda Kuda Kayu Kls I M3 11.00 8,683,647.00 95,520,117.00
Gording Kayu Kls II M3 4.44 8,335,937.00 37,011,560.28
Bumbungan Atap Zenk Licin 0.25 M1 79.20 58,751.00 4,653,079.20
Papan Lisplank M1 202.86 132,907.00 26,961,514.02
REHABILITASI RUANG KANTOR
PEKERJAAN PEMBONGKARAN
keramik Ls 1.00 1,000,000.00 1,000,000.00
Kusen, Pintu, Jendela dan Ventilasi Ls 1.00 1,000,000.00 1,000,000.00
Plafond Ls 1.00 1,000,000.00 1,000,000.00
Penutup Atap Ls 1.00 1,500,000.00 1,500,000.00
PEKERJAAN PASANGAN DAN PLESTERAN
Pasangan Dinding Batu Alam M2 32.69 587,702.00 19,211,978.38
PEKERJAAN KERAMIK
Lantai Keramik Granit 60 x 60 M2 99.45 502,419.00 49,965,569.55
Pekerjaan Plint Keramik T = 10 Cm M1 46.06 37,903.00 1,745,812.18
PEKERJAAN KUSEN PINTU DAN JENDELA VENTILASI
Kusen Kayu Kls I M3 0.31 13,052,187.00 4,046,177.97
Daun Jendela Kayu Kls I M3 0.17 722,150.00 122,765.50
Daun Pintu Panel M3 0.17 991,375.00 168,533.75
Daun Ventilasi Kls I M3 0.10 722,150.00 72,215.00
Kaca Bening M2 7.00 328,669.00 2,300,683.00
PEKERJAAN PLAFOND
Plafond Gipsum Bord M2 98.00 80,327.00 7,872,046.00
Rangka Plafon Kayu Kls II M3 0.81 130,009.00 105,307.29
List Plafon Gipsum M1 48.36 79,211.00 3,830,643.96
PEKERJAAN INSTALASI LISTRIK
Instalasi Lampu Titik 5.00 1,178,543.00 5,892,715.00
Lampu Philip 10 Watt Bh 5.00 175,000.00 875,000.00
PEKERJAAN PENGECATAN
Cat Dinding Lama (Setara Nipon Paint) M2 122.93 56,952.00 7,001,109.36
Cat plafond M2 98.00 56,952.00 5,581,296.00
PEKERJAAN PENGGANTUNG
Kunci Tanam Dua Slak BH 2.00 492,497.00 984,994.00
Engsel Pintu BH 6.00 71,434.00 428,604.00
Engsel Jendela/Ventilasi Psg 48.00 53,666.00 2,575,968.00
Hak Angin Stainles Stel Psg 12.00 76,546.00 918,552.00
Grendel Jendela Dan Fentilasi Psg 12.00 76,546.00 918,552.00
PEKERJAAN ATAP
Atap Senk BJLS 0.25 M2 119.49 124,047.00 14,822,376.03
Rangka Kuda Kuda Kayu Kls I M3 1.41 8,683,647.00 12,243,942.27
Gording Kayu Kls II M3 0.57 8,335,937.00 4,751,484.09
Bumbungan Atap Zenk Licin 0.25 M1 10.23 58,751.00 601,022.73
Papan Lisplank M1 43.72 132,907.00 5,810,694.04
PEKERJAAN ANTI RAAP
Obat Anti Rayap Ls 1.00 29,250,000.00 29,250,000.00
REHABILITASI TOILET SEKOLAH
PEKERJAAN PEMBONGKARAN
Keramik Ls 1.00 1,000,000.00 1,000,000.00
Plafon Ls 1.00 1,000,000.00 1,000,000.00
Atap Senk BJLS 0.25 Ls 1.00 1,500,000.00 1,500,000.00
PEKERJAAN KERAMIK
Lantai Keramik 20 x 20 Anti Slip M2 4.50 236,126.00 1,062,567.00
PEKERJAAN PLAFOND
Plafond Gipsum Bord M2 8.80 80,327.00 706,877.60
Rangka Plafon Kayu Kls II M3 0.18 130,009.00 23,401.62
List Plafon Gipsum M1 12.00 79,211.00 950,532.00
PEKERJAAN INSTALASI LISTRIK
Instalasi Lampu Titik 6.00 1,178,543.00 7,071,258.00
Lampu Philip 10 Watt Bh 6.00 175,000.00 1,050,000.00
PEKERJAAN PENGECATAN
Cat Dinding Lama M2 64.50 56,952.00 3,673,404.00
Cat plafond M2 8.80 56,952.00 501,177.60
PAGAR SEKOLAH
PEKERJAAN AWAL/PERSIAPAN
Pekerjaan Pengukuran dan Bouwplank Ls 1.00 2,500,000.00 2,500,000.00
PEKERJAAN TANAH
Pekerjaan Galian Tanah Pondasi Batu Kali M3 310.33 103,812.00 32,215,977.96
Urugan Tanah Kembali M3 196.33 37,812.00 7,423,629.96
Urug Pasir Bawah Pondasi M3 22.17 576,125.00 12,772,691.25
PEKERJAAN PASANGAN DAN PLESTERAN
Pasangan Batu Kosong M3 66.50 915,073.00 60,852,354.50
Pasangan Pondasi Batu Kali ad. 1 4 M3 202.67 1,420,457.00 287,884,020.19
Pasangan Batu Bata 1 4 M2 814.67 215,149.00 175,275,435.83
Plester Dinding ad 1 4 M2 1,629.33 89,598.00 145,984,709.34
PEKERJAAN BETON
Plat Beton Camp. 123 (164.57 Kg/M3) M3 1.39 6,535,757.69 9,084,703.19
Sloof Beton 15/20 Camp. 123 (177.12 Kg/M3) M3 19.00 5,462,224.49 103,782,265.23
Kolom Beton 20/20 Camp. 123 ( 135.49 Kg/M3) M3 38.43 4,754,041.44 182,697,812.63
Ring Balok Beton 15/20 Camp. 123 (177.12 Kg/M3) M3 19.00 5,592,326.49 106,254,203.23
PEKERJAAN PENGECATAN
Cat Dinding Baru M2 1,629.33 56,952.00 92,793,602.16
Acian M2 1,629.33 50,902.00 82,936,155.66
MENARA AIR
PEKERJAAN AWAL/PERSIAPAN
Pekerjaan Pengukuran dan Bouwplank Ls 1.00 1,500,000.00 1,500,000.00
PEKERJAAN TANAH
Pekerjaan Galian Tanah Pondasi Floor Plat M3 3.12 103,812.00 323,893.44
Urugan Tanah Kembali M3 2.52 37,812.00 95,286.24
Urugan pasir bawah pondasi M3 0.20 576,125.00 115,225.00
Urugan tanah Bawah Lantai M3 3.75 348,012.00 1,305,045.00
PEKERJAAN BETON
Rabat Beton ad. 1 3 5 t = 8 cm M3 0.88 1,390,622.00 1,223,747.36
Pondasi Flor Plat Camp 123 (210.97 Kg/M3) M3 0.80 3,467,670.95 2,774,136.76
Sloof Beton 20/25 Camp 123 (172.11 Kg/M3) M3 0.75 5,462,224.49 4,096,668.36
Plat Lantai Beton t = 12 Cm Camp. 123 (137.19 Kg/M3) M3 1.50 6,535,757.69 9,803,636.54
Plat Dak T = 10 Cm camp. 123 ( 164.57 Kg/M3) M3 1.25 6,535,757.69 8,169,697.12
Kolom Beton 20/20 Camp. 123 ( 135.45 Kg/M3) M3 0.96 4,754,041.44 4,563,879.78
Balok Beton 20/25 Camp. 123 (172.11 Kg/M3) M3 0.75 5,592,326.49 4,194,244.86
Ring Balok Beton 20/25 Camp. 123 (172.11 Kg/M3) M3 0.75 5,592,326.49 4,194,244.86
SANITAIR
Pipa Tangga Gip 1/2 M2 1.92 56,133.00 107,775.36
Pipa Air Masuk 3/4 M1 5.00 43,994.00 219,970.00
Pipa Kuras 3/4 M1 3.30 43,994.00 145,180.20
Stop Kran 3/4 Bh 1.00 80,863.00 80,863.00
Tank Fibier Glas 2200 Liter Bh 1.00 4,500,000.00 4,500,000.00
Pompa Air Ls 1.00 2,500,000.00 2,500,000.00
SALURAN KELILING
PEKERJAAN AWAL/PERSIAPAN
Pekerjaan Pengukuran dan Bouwplank Ls 1.00 1,000,000.00 1,000,000.00
PEKERJAAN TANAH
Galian Tanah M3 37.66 103,812.00 3,909,559.92
Urug Pasir M3 2.41 576,125.00 1,388,461.25
PEKERJAAN BETON
Rabat Beton ad. 1 3 5 t = 5 cm M3 2.41 1,390,622.00 3,351,399.02
PEKERJAAN PASANGAN DAN PLESTERAN
Pasangan Batu Kali ad 1 4 M3 70.01 1,420,457.00 99,446,194.57
Pasangan Batu Bata 1 2 M2 72.42 226,853.00 16,428,694.26
Plesteran Dinding Saluran ad. 12 M2 144.84 95,266.00 13,798,327.44
TAMAN
PEKERJAAN AWAL/PERSIAPAN
Pekerjaan Pengukuran dan Bouwplank Ls 1.00 1,000,000.00 1,000,000.00
PEKERJAAN TANAH
Pekerjaan Galian Tanah M3 2.18 103,812.00 226,310.16
Urugan Tanah Kembali M3 45.40 37,812.00 1,716,664.80
PEKERJAAN PASANGAN DAN PLESTERAN
Pasangan Batu Bata 1 4 M2 53.70 215,149.00 11,553,501.30
Plester Dinding ad 1 4 M2 53.70 89,598.00 4,811,412.60
Pas. Pohon Bunga Pucuk Merah T = 1M Bh 38.00 145,600.00 5,532,800.00
Tanam Rumput Hias M2 84.07 125,300.00 10,533,971.00
LAPANGAN UPACARA
PEKERJAAN BETON
Rabat Beton ad. 1 3 5 t = 10 cm M3 48.00 1,390,622.00 66,749,856.00
GASEBO
PEKERJAAN PENGUKURAN DAN BOUWPLANK
Pekerjaan Pengukuran dan Bouwplank Ls 1.00 1,000,000.00 1,000,000.00
PEKERJAAN TANAH
Pekerjaan Galian Tanah Pondasi Floor Plat M3 1.00 103,812.00 103,812.00
Urugan Tanah Kembali M3 0.81 37,812.00 30,627.72
Urugan tanah Bawah Lantai M3 2.25 348,012.00 783,027.00
PEKERJAAN PASANGAN DAN PLESTERAN
Pasangan Batu Bata 1 4 M2 11.36 215,149.00 2,444,092.64
Plester Dinding ad 1 4 M2 19.36 89,598.00 1,734,617.28
PEKERJAAN BETON
Rabat Beton ad. 1 3 5 t = 8 cm M3 3.15 1,390,622.00 4,380,459.30
Pondasi Flor Plat Camp 123 (210.97 Kg/M3) M3 0.19 3,467,670.95 658,857.48
Plat Beton Camp. 123 (164.97 Kg/M3) M3 0.83 5,592,326.49 4,641,630.98
Kolom Beton 10/10 Camp. 123 (319.15 Kg/M3) M3 0.15 5,583,911.49 837,586.72
PEKERJAAN KERAMIK
Lantai Keramik 20 x 20 M2 10.40 236,126.00 2,455,710.40
PEKERJAAN ATAP
Atap Senk BJLS 0.25 M2 23.85 124,047.00 2,958,520.95
Rangka Kuda Kuda Kayu Kls I M3 0.17 8,683,647.00 1,476,219.99
Gording Kayu Kls II M3 0.23 8,335,937.00 1,917,265.51
Bumbungan Atap Zenk Licin 0.25 M1 30.00 58,751.00 1,762,530.00
Papan Lisplank M1 31.80 132,907.00 4,226,442.60
PEKERJAAN AKHIR
Pembersihan Akhir Ls 1.00 1,500,000.00 1,500,000.00
Dokumentasi dan Pelaporan Ls 1.00 3,500,000.00 3,500,000.00
Asbuild Drawing Ls 1.00 3,000,000.00 3,000,000.00
PEKERJAAN PENGADAAN K3
Alat Pelindung Diri (APD)
Topi Pelindung (Safet Helmet) Bh 45.00 115,000.00 5,175,000.00
Pelindung Pernapasan Pcs 90.00 10,000.00 900,000.00
Sarung Tangan (Safety) Pcs 90.00 10,000.00 900,000.00
Sepatu tangan (Safety Lars) Bh 45.00 225,000.00 10,125,000.00
Rompi Keselamatan (Sefety Vast Bh 90.00 85,000.00 7,650,000.00
Sabuk Keselamatan (Sefety Belt) Bh 45.00 45,000.00 2,025,000.00
Fasilitas Sarana Kesehatan
P3K Set 1.00 3,500,000.00 3,500,000.00
DAFTAR KUANTITAS DAN HARGA

KEGIATAN : REHABILITASI DAN RENOVASI SARANA PRASARANA SEKOLAH


PEKERJAAN : REHABILITASI DAN RENOVASI SARANA PRASARANA SEKOLAH SD INPRES NAMAA
LOKASI : SD INPRES NAMAA
T.ANGGARAN : 2019

NO URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN (Rp.) TOTAL HARGA (Rp.)

NO

SD INPRES NAMAA
REHABILITASI 6 RUANG
PEKERJAAN PEMBONGKARAN
keramik Ls 1.00 1,000,000.00 1,000,000.00
Kusen, Pintu, Jendela dan Ventilasi Ls 1.00 1,000,000.00 1,000,000.00
Plafond Ls 1.00 1,000,000.00 1,000,000.00
Penutup Atap Ls 1.00 1,500,000.00 1,500,000.00
PEKERJAAN PASANGAN DAN PLESTERAN
Pasangan Dinding Batu Alam M2 125.80 587,702.00 73,932,911.60
PEKERJAAN KERAMIK
Lantai Keramik Granit 60 x 60 M2 336.00 502,419.00 168,812,784.00
Pekerjaan Plint Keramik T = 10 Cm M1 174.60 37,903.00 6,617,863.80
PEKERJAAN KUSEN PINTU DAN JENDELA VENTILASI
Kusen Kayu Kls I M3 2.06 13,052,187.00 26,887,505.22
Daun Jendela Kayu Kls I M3 1.24 722,150.00 895,466.00
Daun Pintu Panel M3 0.48 991,375.00 475,860.00
Daun Ventilasi Kls I M3 0.70 722,150.00 505,505.00
Kaca Bening M2 9.43 328,669.00 3,099,348.67
PEKERJAAN PLAFOND
Plafond Gipsum Bord M2 468.00 80,327.00 37,593,036.00
Rangka Plafon Kayu Kls II M3 3.86 130,009.00 501,834.74
List Plafon Gipsum M1 180.00 79,211.00 14,257,980.00
PEKERJAAN INSTALASI LISTRIK
Instalasi Lampu Titik 6.00 1,178,543.00 7,071,258.00
Lampu Philip 10 Watt Bh 6.00 175,000.00 1,050,000.00
PEKERJAAN PENGECATAN
Cat Dinding Lama M2 844.83 56,952.00 48,114,758.16
Cat plafond M2 468.00 56,952.00 26,653,536.00
PEKERJAAN PENGGANTUNG
Kunci Tanam Dua Slak BH 6.00 492,497.00 2,954,982.00
Engsel Pintu BH 18.00 71,434.00 1,285,812.00
Engsel Jendela/Ventilasi Psg 120.00 53,666.00 6,439,920.00
Hak Angin Stainles Stel Psg 60.00 76,546.00 4,592,760.00
Grendel Jendela Dan Fentilasi Psg 60.00 76,546.00 4,592,760.00
PEKERJAAN ATAP
Atap Senk BJLS 0.25 M2 596.64 124,047.00 74,011,402.08
Rangka Kuda Kuda Kayu Kls I M3 7.33 8,683,647.00 63,651,132.51
Gording Kayu Kls II M3 2.96 8,335,937.00 24,674,373.52
Bumbungan Atap Zenk Licin 0.25 M1 52.80 58,751.00 3,102,052.80
Papan Lisplank M1 135.24 132,907.00 17,974,342.68
REHABILITASI RUANG KEPSEK + RUANG GURU
PEKERJAAN PEMBONGKARAN
keramik Ls 1.00 1,000,000.00 1,000,000.00
Kusen, Pintu, Jendela dan Ventilasi Ls 1.00 1,000,000.00 1,000,000.00
Plafond Ls 1.00 1,000,000.00 1,000,000.00
Penutup Atap Ls 1.00 1,500,000.00 1,500,000.00
PEKERJAAN PASANGAN DAN PLESTERAN
Pasangan Dinding Batu Alam M2 64.23 587,702.00 37,748,099.46
PEKERJAAN KERAMIK
Lantai Keramik Granit 60 x 60 M2 198.90 502,419.00 99,931,139.10
Pekerjaan Plint Keramik T = 10 Cm M1 92.12 37,903.00 3,491,624.36
PEKERJAAN KUSEN PINTU DAN JENDELA VENTILASI
Kusen Kayu Kls I M3 0.62 13,052,187.00 8,092,355.94
Daun Jendela Kayu Kls I M3 0.33 722,150.00 238,309.50
Daun Pintu Panel M3 0.34 991,375.00 337,067.50
Daun Ventilasi Kls I M3 0.20 722,150.00 144,430.00
Kaca Bening M2 13.99 328,669.00 4,598,079.31
PEKERJAAN PLAFOND
Plafond Gipsum Bord M2 196.00 80,327.00 15,744,092.00
Rangka Plafon Kayu Kls II M3 1.62 130,009.00 210,614.58
List Plafon Gipsum M1 96.72 79,211.00 7,661,287.92
PEKERJAAN INSTALASI LISTRIK
Instalasi Lampu Titik 10.00 1,178,543.00 11,785,430.00
Lampu Philip 10 Watt Bh 10.00 175,000.00 1,750,000.00
PEKERJAAN PENGECATAN
Cat Dinding Lama (Setara Nipon Paint) M2 245.87 56,952.00 14,002,788.24
Cat plafond M2 196.00 56,952.00 11,162,592.00
PEKERJAAN PENGGANTUNG
Kunci Tanam Dua Slak BH 4.00 492,497.00 1,969,988.00
Engsel Pintu BH 12.00 71,434.00 857,208.00
Engsel Jendela/Ventilasi Psg 96.00 53,666.00 5,151,936.00
Hak Angin Stainles Stel Psg 24.00 76,546.00 1,837,104.00
Grendel Jendela Dan Fentilasi Psg 24.00 76,546.00 1,837,104.00
PEKERJAAN ATAP
Atap Senk BJLS 0.25 M2 238.97 124,047.00 29,643,511.59
Rangka Kuda Kuda Kayu Kls I M3 2.83 8,683,647.00 24,574,721.01
Gording Kayu Kls II M3 1.15 8,335,937.00 9,586,327.55
Bumbungan Atap Zenk Licin 0.25 M1 20.46 58,751.00 1,202,045.46
Papan Lisplank M1 87.44 132,907.00 11,621,388.08
REHABILITASI PERPUSTAKAAN + 1 RUANG KELAS
PEKERJAAN PEMBONGKARAN
keramik Ls 1.00 1,000,000.00 1,000,000.00
Kusen, Pintu, Jendela dan Ventilasi Ls 1.00 1,000,000.00 1,000,000.00
Plafond Ls 1.00 1,000,000.00 1,000,000.00
Penutup Atap Ls 1.00 1,500,000.00 1,500,000.00
PEKERJAAN PASANGAN DAN PLESTERAN
Pasangan Dinding Batu Alam M2 67.64 587,702.00 39,752,163.28
PEKERJAAN KERAMIK
Lantai Keramik Granit 60 x 60 M2 198.90 502,419.00 99,931,139.10
Pekerjaan Plint Keramik T = 10 Cm M1 92.12 37,903.00 3,491,624.36
PEKERJAAN KUSEN PINTU DAN JENDELA VENTILASI
Kusen Kayu Kls I M3 0.33 13,052,187.00 4,307,221.71
Daun Jendela Kayu Kls I M3 0.17 722,150.00 122,765.50
Daun Pintu Panel M3 0.26 991,375.00 257,757.50
Daun Ventilasi Kls I M3 0.10 722,150.00 72,215.00
Kaca Bening M2 7.00 328,669.00 2,300,683.00
PEKERJAAN PLAFOND
Plafond Gipsum Bord M2 196.00 80,327.00 15,744,092.00
Rangka Plafon Kayu Kls II M3 1.62 130,009.00 210,614.58
List Plafon Gipsum M1 60.00 79,211.00 4,752,660.00
PEKERJAAN INSTALASI LISTRIK
Instalasi Lampu Titik 13.00 1,178,543.00 15,321,059.00
Lampu Philip 10 Watt Bh 13.00 175,000.00 2,275,000.00
PEKERJAAN PENGECATAN
Cat Dinding Lama (Setara Nipon Paint) M2 420.00 56,952.00 23,919,840.00
Cat plafond M2 196.00 56,952.00 11,162,592.00
PEKERJAAN PENGGANTUNG
Kunci Tanam Dua Slak BH 2.00 492,497.00 984,994.00
Engsel Pintu BH 6.00 71,434.00 428,604.00
Engsel Jendela/Ventilasi Psg 48.00 53,666.00 2,575,968.00
Hak Angin Stainles Stel Psg 24.00 76,546.00 1,837,104.00
Grendel Jendela Dan Fentilasi Psg 24.00 76,546.00 1,837,104.00
PEKERJAAN ATAP
Atap Senk BJLS 0.25 M2 238.97 124,047.00 29,643,511.59
Rangka Kuda Kuda Kayu Kls I M3 2.83 8,683,647.00 24,574,721.01
Gording Kayu Kls II M3 1.15 8,335,937.00 9,586,327.55
Bumbungan Atap Zenk Licin 0.25 M1 20.46 58,751.00 1,202,045.46
Papan Lisplank M1 87.44 132,907.00 11,621,388.08
REHABILITASI TOILET SEKOLAH
PEKERJAAN PEMBONGKARAN
Keramik Ls 1.00 1,000,000.00 1,000,000.00
Plafon Ls 1.00 1,000,000.00 1,000,000.00
Atap Senk BJLS 0.25 Ls 1.00 1,500,000.00 1,500,000.00
PEKERJAAN KERAMIK
Lantai Keramik 20 x 20 Anti Slip M2 4.50 236,126.00 1,062,567.00
PEKERJAAN PLAFOND
Plafond Gipsum Bord M2 8.80 80,327.00 706,877.60
Rangka Plafon Kayu Kls II M3 0.18 130,009.00 23,401.62
List Plafon Gipsum M1 12.00 79,211.00 950,532.00
PEKERJAAN INSTALASI LISTRIK
Instalasi Lampu Titik 6.00 1,178,543.00 7,071,258.00
Lampu Philip 10 Watt Bh 6.00 175,000.00 1,050,000.00
PEKERJAAN PENGECATAN
Cat Dinding Lama M2 64.50 56,952.00 3,673,404.00
Cat plafond M2 8.80 56,952.00 501,177.60
PAGAR SEKOLAH
PEKERJAAN AWAL/PERSIAPAN
Pekerjaan Pengukuran dan Bouwplank Ls 1.00 2,500,000.00 2,500,000.00
PEKERJAAN TANAH
Pekerjaan Galian Tanah Pondasi Batu Kali M3 264.60 103,812.00 27,468,655.20
Urugan Tanah Kembali M3 167.40 37,812.00 6,329,728.80
Urug Pasir Bawah Pondasi M3 18.90 576,125.00 10,888,762.50
PEKERJAAN PASANGAN DAN PLESTERAN
Pasangan Batu Kosong M3 56.70 915,073.00 51,884,639.10
Pasangan Pondasi Batu Kali ad. 1 4 M3 172.80 1,420,457.00 245,454,969.60
Pasangan Batu Bata 1 4 M2 691.60 215,149.00 148,797,048.40
Plester Dinding ad 1 4 M2 1,383.20 89,598.00 123,931,953.60
PEKERJAAN BETON
Plat Beton Camp. 123 (164.57 Kg/M3) M3 1.67 6,535,757.69 10,914,715.35
Sloof Beton 15/20 Camp. 123 (177.12 Kg/M3) M3 16.20 5,462,224.49 88,488,036.67
Kolom Beton 20/20 Camp. 123 ( 135.45 Kg/M3) M3 32.92 4,754,041.44 156,503,044.28
Ring Balok Beton 15/20 Camp. 123 (177.12 Kg/M3) M3 16.20 5,592,326.49 90,595,689.07
PEKERJAAN PENGECATAN
Cat Dinding Baru (Setara Nipon Paint) M2 1,383.20 56,952.00 78,776,006.40
Acian M2 1,383.20 50,902.00 70,407,646.40
MENARA AIR
PEKERJAAN AWAL/PERSIAPAN
Pekerjaan Pengukuran dan Bouwplank Ls 1.00 1,500,000.00 1,500,000.00
PEKERJAAN TANAH
Pekerjaan Galian Tanah Pondasi Floor Plat M3 3.12 103,812.00 323,893.44
Urugan Tanah Kembali M3 2.52 37,812.00 95,286.24
Urugan pasir bawah pondasi M3 0.20 576,125.00 115,225.00
Urugan tanah Bawah Lantai M3 3.75 348,012.00 1,305,045.00
PEKERJAAN BETON
Rabat Beton ad. 1 3 5 t = 8 cm M3 0.88 1,390,622.00 1,223,747.36
Pondasi Flor Plat Camp 123 (210.97 Kg/M3) M3 0.80 3,467,670.95 2,774,136.76
Sloof Beton 20/25 Camp 123 (172.11 Kg/M3) M3 0.75 5,462,224.49 4,096,668.36
Plat Lantai Beton t = 12 Cm Camp. 123 (137.19 Kg/M3) M3 1.50 6,535,757.69 9,803,636.54
Plat Dak T = 10 Cm camp. 123 ( 164.57 Kg/M3) M3 1.25 6,535,757.69 8,169,697.12
Kolom Beton 20/20 Camp. 123 ( 135.49 Kg/M3) M3 0.96 4,754,041.44 4,563,879.78
Balok Beton 20/25 Camp. 123 (172.11 Kg/M3) M3 0.75 5,592,326.49 4,194,244.86
Ring Balok Beton 20/25 Camp. 123 (172.11 Kg/M3) M3 0.75 5,592,326.49 4,194,244.86
SANITAIR
Pipa Tangga Gip 1/2 M2 1.92 56,133.00 107,775.36
Pipa Air Masuk 3/4 M1 5.00 43,994.00 219,970.00
Pipa Kuras 3/4 M1 3.30 43,994.00 145,180.20
Stop Kran 3/4 Bh 1.00 80,863.00 80,863.00
Tank Fibier Glas 2200 Liter Bh 1.00 4,500,000.00 4,500,000.00
Pompa Air Ls 1.00 2,500,000.00 2,500,000.00
SALURAN KELILING
PEKERJAAN AWAL/PERSIAPAN
Pekerjaan Pengukuran dan Bouwplank Ls 1.00 1,000,000.00 1,000,000.00
PEKERJAAN TANAH
Galian Tanah M3 43.45 103,812.00 4,510,631.40
Urug Pasir M3 2.79 576,125.00 1,607,388.75
PEKERJAAN BETON
Rabat Beton ad. 1 3 5 t = 5 cm M3 2.79 1,390,622.00 3,879,835.38
PEKERJAAN PASANGAN DAN PLESTERAN
Pasangan Batu Kali ad 1 4 M3 80.78 1,420,457.00 114,744,516.46
Pasangan Batu Bata 1 2 M2 83.56 226,853.00 18,955,836.68
Plesteran Dinding Saluran ad. 12 M2 167.12 95,266.00 15,920,853.92
TAMAN
PEKERJAAN AWAL/PERSIAPAN
Pekerjaan Pengukuran dan Bouwplank Ls 1.00 1,000,000.00 1,000,000.00
PEKERJAAN TANAH
Pekerjaan Galian Tanah M3 2.18 103,812.00 226,310.16
Urugan Tanah Kembali M3 45.40 37,812.00 1,716,664.80
PEKERJAAN PASANGAN DAN PLESTERAN
Pasangan Batu Bata 1 4 M2 53.70 215,149.00 11,553,501.30
Plester Dinding ad 1 4 M2 53.70 89,598.00 4,811,412.60
Pas. Pohon Bunga Pucuk Merah T = 1M Bh 38.00 145,600.00 5,532,800.00
Tanam Rumput Hias M2 84.07 125,300.00 10,533,971.00
LAPANGAN UPACARA
PEKERJAAN BETON
Rabat Beton ad. 1 3 5 t = 10 cm M3 189.00 1,390,622.00 262,827,558.00
GASEBO
PEKERJAAN PENGUKURAN DAN BOUWPLANK
Pekerjaan Pengukuran dan Bouwplank Ls 1.00 1,000,000.00 1,000,000.00
PEKERJAAN TANAH
Pekerjaan Galian Tanah Pondasi Floor Plat M3 1.00 103,812.00 103,812.00
Urugan Tanah Kembali M3 0.81 37,812.00 30,627.72
Urugan tanah Bawah Lantai M3 2.25 348,012.00 783,027.00
PEKERJAAN PASANGAN DAN PLESTERAN
Pasangan Batu Bata 1 4 M2 11.36 215,149.00 2,444,092.64
Plester Dinding ad 1 4 M2 19.36 89,598.00 1,734,617.28
PEKERJAAN BETON
Rabat Beton ad. 1 3 5 t = 8 cm M3 3.15 1,390,622.00 4,380,459.30
Pondasi Flor Plat Camp 123 (210.97 Kg/M3) M3 0.19 3,467,670.95 658,857.48
Plat Beton Camp. 123 (164.57 Kg/M3) M3 0.83 5,592,326.49 4,641,630.98
Kolom Beton 10/10 Camp. 123 (319.51 Kg/M3) M3 0.15 5,583,911.49 837,586.72
PEKERJAAN KERAMIK
Lantai Keramik 20 x 20 M2 10.40 236,126.00 2,455,710.40
PEKERJAAN ATAP
Atap Senk BJLS 0.25 M2 23.85 124,047.00 2,958,520.95
Rangka Kuda Kuda Kayu Kls I M3 0.17 8,683,647.00 1,476,219.99
Gording Kayu Kls II M3 0.23 8,335,937.00 1,917,265.51
Bumbungan Atap Zenk Licin 0.25 M1 30.00 58,751.00 1,762,530.00
Papan Lisplank M1 31.80 132,907.00 4,226,442.60
Anti Rayap Ls 1.00 10,000,000.00 10,000,000.00
PEKERJAAN AKHIR
Pembersihan Akhir Ls 1.00 1,500,000.00 1,500,000.00
Dokumentasi dan Pelaporan Ls 1.00 3,500,000.00 3,500,000.00
Asbuild Drawing Ls 1.00 3,000,000.00 3,000,000.00
PEKERJAAN PENGADAAN K3
Alat Pelindung Diri (APD)
Topi Pelindung (Safet Helmet) Bh 45.00 115,000.00 5,175,000.00
Pelindung Pernapasan Pcs 90.00 10,000.00 900,000.00
Sarung Tangan (Safety) Pcs 90.00 10,000.00 900,000.00
Sepatu tangan (Safety Lars) Bh 45.00 225,000.00 10,125,000.00
Rompi Keselamatan (Sefety Vast Bh 90.00 85,000.00 7,650,000.00
Sabuk Keselamatan (Sefety Belt) Bh 45.00 45,000.00 2,025,000.00
Fasilitas Sarana Kesehatan
P3K Set 1.00 3,500,000.00 3,500,000.00
PERUBAHAN
HARGA TOTAL HARGA
URAIAN PEKERJAAN SATUAN VOLUME
SATUAN (Rp.) (Rp.)

SD INPRES NAMAA
REHABILITASI 6 RUANG
PEKERJAAN PEMBONGKARAN
keramik Ls 1.00 1,000,000.00 1,000,000.00
Kusen, Pintu, Jendela dan Ventilasi Ls 1.00 1,000,000.00 1,000,000.00
Plafond Ls 1.00 1,000,000.00 1,000,000.00
Penutup Atap Ls 1.00 1,500,000.00 1,500,000.00
PEKERJAAN PASANGAN DAN PLESTERAN
Pasangan Dinding Batu Alam M2 96.57 - -
PEKERJAAN KERAMIK
Lantai Keramik Granit 60 x 60 M2 877.20 #VALUE!
PEKERJAAN KUSEN PINTU DAN JENDELA VENTILASI
Kusen Kayu Kls I M3 5.56 - -
Daun Jendela Kayu Kls I M3 0.95 - -
Daun Pintu Panel M3 1.62 - -
Daun Ventilasi Kls I M3 39.47 - -
Kaca Bening M2 58.51 - -
PEKERJAAN PLAFOND
Plafond GRC Bord M2 972.00 - -
Rangka Plafon Kayu Kls II M3 4.87 - -
List Plafon M1 572.00 - -
PEKERJAAN INSTALASI LISTRIK
Instalasi Lampu Titik 6.00 - -
Lampu Philip 10 Watt Bh 6.00 - -
PEKERJAAN PENGECATAN
Cat Dinding Baru M2 1,134.00 - -
Cat plafond M2 972.00 - -
PEKERJAAN PENGGANTUNG
Kunci Tanam Dua Slak BH 18.00 - -
Engsel Pintu BH 54.00 - -
Engsel Jendela/Ventilasi Psg 258.00 - -
Hak Angin Stainles Stel Psg 129.00 - -
Grendel Jendela Psg 129.00 - -
PEKERJAAN ATAP
Atap Genteng Metal Rainbouw M2 1,101.06 - -
Rangka Kuda Kuda Kayu Kls I M3 2.49 - -
Gording Kayu Kls II M3 3.56 - -
Bumbungan Atap Zenk Licin 0.25 M1 94.00 - -
Papan Lisplank M1 312.00 - -
REHABILITASI RUANG KEPSEK + RUANG GURU
PEKERJAAN PEMBONGKARAN
keramik Ls 1.00 1,000,000.00 1,000,000.00
Kusen, Pintu, Jendela dan Ventilasi Ls 1.00 1,000,000.00 1,000,000.00
Plafond Ls 1.00 1,000,000.00 1,000,000.00
Penutup Atap Ls 1.00 1,500,000.00 1,500,000.00
PEKERJAAN PASANGAN DAN PLESTERAN
Pasangan Dinding Batu Alam M2 64.23 - -
PEKERJAAN KERAMIK
Lantai Keramik Granit 60 x 60 M2 198.90 #VALUE!
Pekerjaan Plint Keramik T = 10 Cm M1 92.12 #REF! #REF!
PEKERJAAN KUSEN PINTU DAN JENDELA VENTILASI
Kusen Kayu Kls I M3 0.62 - -
Daun Jendela Kayu Kls I M3 0.33 - -
Daun Pintu Panel M3 0.34 - -
Daun Ventilasi Kls I M3 0.20 - -
Kaca Bening M2 13.99 - -
PEKERJAAN PLAFOND
Plafond Gipsum Bord M2 196.00 - -
Rangka Plafon Kayu Kls II M3 1.62 - -
List Plafon Gipsum M1 96.72 - -
PEKERJAAN INSTALASI LISTRIK
Instalasi Lampu Titik 10.00 - -
Lampu Philip 10 Watt Bh 10.00 - -
PEKERJAAN PENGECATAN
Cat Dinding Lama (Setara Nipon Paint) M2 - #VALUE!
Cat plafond M2 196.00 - -
PEKERJAAN PENGGANTUNG
Kunci Tanam Dua Slak BH 4.00 - -
Engsel Pintu BH 12.00 - -
Engsel Jendela/Ventilasi Psg 96.00 - -
Hak Angin Stainles Stel Psg 24.00 - -
Grendel Jendela Dan Fentilasi Psg 24.00 - -
PEKERJAAN ATAP
Atap Senk BJLS 0.25 M2 238.97 - -
Rangka Kuda Kuda Kayu Kls I M3 2.83 - -
Gording Kayu Kls II M3 1.15 - -
Bumbungan Atap Zenk Licin 0.25 M1 20.46 - -
Papan Lisplank M1 87.44 - -
REHABILITASI PERPUSTAKAAN + 1 RUANG KELAS
PEKERJAAN PEMBONGKARAN
keramik Ls 1.00 1,000,000.00 1,000,000.00
Kusen, Pintu, Jendela dan Ventilasi Ls 1.00 1,000,000.00 1,000,000.00
Plafond Ls 1.00 1,000,000.00 1,000,000.00
Penutup Atap Ls 1.00 1,500,000.00 1,500,000.00
PEKERJAAN PASANGAN DAN PLESTERAN
Pasangan Dinding Batu Alam M2 67.64 - -
PEKERJAAN KERAMIK
Lantai Keramik Granit 60 x 60 M2 198.90 #VALUE!
Pekerjaan Plint Keramik T = 10 Cm M1 92.12 #REF! #REF!
PEKERJAAN KUSEN PINTU DAN JENDELA VENTILASI
Kusen Kayu Kls I M3 0.33 - -
Daun Jendela Kayu Kls I M3 0.17 - -
Daun Pintu Panel M3 0.26 - -
Daun Ventilasi Kls I M3 0.10 - -
Kaca Bening M2 7.00 - -
PEKERJAAN PLAFOND
Plafond Gipsum Bord M2 196.00 - -
Rangka Plafon Kayu Kls II M3 1.62 - -
List Plafon Gipsum M1 60.00 - -
PEKERJAAN INSTALASI LISTRIK
Instalasi Lampu Titik 13.00 - -
Lampu Philip 10 Watt Bh 13.00 - -
PEKERJAAN PENGECATAN
Cat Dinding Lama (Setara Nipon Paint) M2 420.00 - -
Cat plafond M2 196.00 - -
PEKERJAAN PENGGANTUNG
Kunci Tanam Dua Slak BH 2.00 - -
Engsel Pintu BH 6.00 - -
Engsel Jendela/Ventilasi Psg 48.00 - -
Hak Angin Stainles Stel Psg 24.00 - -
Grendel Jendela Dan Fentilasi Psg 24.00 - -
PEKERJAAN ATAP
Atap Senk BJLS 0.25 M2 238.97 - -
Rangka Kuda Kuda Kayu Kls I M3 2.83 - -
Gording Kayu Kls II M3 1.15 - -
Bumbungan Atap Zenk Licin 0.25 M1 20.46 - -
Papan Lisplank M1 87.44 - -
REHABILITASI TOILET B. 5
PEKERJAAN PEMBONGKARAN
Keramik Ls 1.00 - -
Plafon Ls 1.00 - -
Atap Senk BJLS 0.25 Ls 1.00 - -
PEKERJAAN KERAMIK
Lantai Keramik 20 x 20 Anti Slip M2 78.00 - -
PEKERJAAN PLAFOND
Plafond Gipsum Bord M2 78.00 -
Rangka Plafon Kayu Kls II M3 0.10 - -
List Plafon Gipsum M1 34.00 - -
PEKERJAAN INSTALASI LISTRIK
Instalasi Lampu Titik 6.00 - -
Lampu Philip 10 Watt Bh 6.00 - -
PEKERJAAN PENGECATAN
Cat Dinding Lama M2 21.00 - -
Cat plafond M2 78.00 - -
PAGAR SEKOLAH
PEKERJAAN AWAL/PERSIAPAN
Pekerjaan Pengukuran dan Bouwplank Ls 1.00 - -
PEKERJAAN TANAH
Pekerjaan Galian Tanah Pondasi Batu Kali M3 117.09 - -
Urugan Tanah Kembali M3 84.99 - -
Urug Pasir Bawah Pondasi M3 5.84 - -
PEKERJAAN PASANGAN DAN PLESTERAN
Pasangan Batu Kosong M3 14.64 - -
Pasangan Pondasi Batu Kali ad. 1 4 M3 38.78 - -
Pasangan Batu Bata 1 4 M2 568.79 - -
Plester Dinding ad 1 4 M2 568.79 - -
PEKERJAAN BETON
Plat Beton Camp. 123 (164.57 Kg/M3) M3 1.67 - -
Sloof Beton 15/20 Camp. 123 (177.12 Kg/M3) M3 9.75 - -
Kolom Beton 20/20 Camp. 123 ( 135.45 Kg/M3) M3 55.16 - -
Ring Balok Beton 15/20 Camp. 123 (177.12 Kg/ M3 9.75 - -
PEKERJAAN PENGECATAN
Cat Dinding Baru (Setara Nipon Paint) M2 527.82 - -
Acian M2 527.82 - -
MENARA AIR
PEKERJAAN AWAL/PERSIAPAN
Pekerjaan Pengukuran dan Bouwplank Ls 1.00 - -
PEKERJAAN TANAH
Pekerjaan Galian Tanah Pondasi Floor Plat M3 3.12 - -
Urugan Tanah Kembali M3 2.52 - -
Urugan pasir bawah pondasi M3 0.20 - -
Urugan tanah Bawah Lantai M3 3.75 - -
PEKERJAAN BETON
Rabat Beton ad. 1 3 5 t = 8 cm M3 0.88 - -
Pondasi Flor Plat Camp 123 (210.97 Kg/M3) M3 0.80 - -
Sloof Beton 20/25 Camp 123 (172.11 Kg/M3) M3 0.75 - -
Plat Lantai Beton t = 12 Cm Camp. 123 (137.19 M3 1.50 - -
Plat Dak T = 10 Cm camp. 123 ( 164.57 Kg/M3) M3 1.25 - -
Kolom Beton 20/20 Camp. 123 ( 135.49 Kg/M3) M3 0.96 - -
Balok Beton 20/25 Camp. 123 (172.11 Kg/M3) M3 0.75 - -
Ring Balok Beton 20/25 Camp. 123 (172.11 Kg/ M3 0.75 - -
SANITAIR
Pipa Tangga Gip 1/2 M2 1.92 - -
Pipa Air Masuk 3/4 M1 5.00 - -
Pipa Kuras 3/4 M1 3.30 - -
Stop Kran 3/4 Bh 1.00 - -
Tank Fibier Glas 2200 Liter Bh 1.00 - -
Pompa Air Ls 1.00 - -
SALURAN KELILING
PEKERJAAN AWAL/PERSIAPAN
Pekerjaan Pengukuran dan Bouwplank Ls 1.00 - -
PEKERJAAN TANAH
Galian Tanah M3 43.45 - -
Urug Pasir M3 2.79 - -
PEKERJAAN BETON
Rabat Beton ad. 1 3 5 t = 5 cm M3 2.79 - -
PEKERJAAN PASANGAN DAN PLESTERAN
Pasangan Batu Kali ad 1 4 M3 80.78 - -
Pasangan Batu Bata 1 2 M2 83.56 - -
Plesteran Dinding Saluran ad. 12 M2 167.12 - -
TAMAN
PEKERJAAN AWAL/PERSIAPAN
Pekerjaan Pengukuran dan Bouwplank Ls 1.00 - -
PEKERJAAN TANAH
Pekerjaan Galian Tanah M3 2.18 - -
Urugan Tanah Kembali M3 45.40 - -
PEKERJAAN PASANGAN DAN PLESTERAN
Pasangan Batu Bata 1 4 M2 53.70 - -
Plester Dinding ad 1 4 M2 53.70 - -
Pas. Pohon Bunga Pucuk Merah T = 1M Bh 38.00 - -
Tanam Rumput Hias M2 84.07 - -
LAPANGAN VOLI
PEKERJAAN BETON
Rabat Beton ad. 1 3 5 t = 10 cm M3 16.20 - -
GASEBO
PEKERJAAN PENGUKURAN DAN BOUWPLANK
Pekerjaan Pengukuran dan Bouwplank Ls 1.00 - -
PEKERJAAN TANAH
Pekerjaan Galian Tanah Pondasi Floor Plat M3 0.06 - -
Urugan Tanah Kembali M3 0.81 - -
Urugan tanah Bawah Lantai M3 0.01 - -
PEKERJAAN PASANGAN DAN PLESTERAN
Pasangan Batu Bata 1 4 M2 11.36 - -
Plester Dinding ad 1 4 M2 19.36 - -
PEKERJAAN BETON
Rabat Beton ad. 1 3 5 t = 8 cm M3 3.15 - -
Pondasi Flor Plat Camp 123 (210.97 Kg/M3) M3 0.75 - -
Plat Beton Camp. 123 (164.57 Kg/M3) M3 0.83 - -
Tiang Kayu Ukuran 10/10 cm M3 0.15 - -
PEKERJAAN KERAMIK
Lantai Keramik 20 x 20 M2 10.40 - -
PEKERJAAN ATAP
Atap Senk BJLS 0.25 M2 29.92 - -
Rangka Kuda Kuda Kayu Kls I M3 0.17 - -
Gording Kayu Kls II M3 0.23 - -
Bumbungan Atap Zenk Licin 0.25 M1 8.00 - -
Papan Lisplank M1 2.80 - -
Anti Rayap Ls 1.00 10,000,000.00 10,000,000.00
PEKERJAAN AKHIR
Pembersihan Akhir Ls 1.00 - -
Dokumentasi dan Pelaporan Ls 1.00 - -
Asbuild Drawing Ls 1.00 - -
PEKERJAAN PENGADAAN K3
Alat Pelindung Diri (APD)
Topi Pelindung (Safet Helmet) Bh 45.00 - -
Pelindung Pernapasan Pcs 90.00 - -
Sarung Tangan (Safety) Pcs 90.00 - -
Sepatu tangan (Safety Lars) Bh 45.00 - -
Rompi Keselamatan (Sefety Vast Bh 90.00 - -
Sabuk Keselamatan (Sefety Belt) Bh 45.00 - -
Fasilitas Sarana Kesehatan
P3K Set 1.00 - -
Tambahan

HARGA SATUAN
NO URAIAN PEKERJAAN SATUAN VOLUME TOTAL HARGA (Rp.)
(Rp.)

SD INPRES NAMAA
REHABILITASI 6 RUANG
PEKERJAAN PEMBONGKARAN
keramik Ls 1.00 1,000,000.00 1,000,000.00
Kusen, Pintu, Jendela dan Ventilasi Ls 1.00 1,000,000.00 1,000,000.00
Plafond Ls 1.00 1,000,000.00 1,000,000.00
Penutup Atap Ls 1.00 1,500,000.00 1,500,000.00

PEKERJAAN PASANGAN DAN PLESTERAN


Pasangan Dinding Batu Alam M2 96.57 587,702.00 56,754,382.14

PEKERJAAN KERAMIK
Lantai Keramik Granito 60 x 60 M2 877.20 502,419.00 440,721,946.80

PEKERJAAN KUSEN PINTU DAN JENDELA VENTILASI


Kusen Kayu Kls I M3 5.56 13,052,187.00 72,570,159.72
Daun Jendela Kayu Kls I M3 0.95 722,150.00 686,042.50
Daun Pintu Panel M3 1.62 991,375.00 1,606,027.50
Daun Ventilasi Kls I M3 39.47 722,150.00 28,503,260.50
Kaca Bening M2 58.51 328,669.00 19,230,423.19

PEKERJAAN PLAFOND
Plafond GRC Board M2 972.00 80,327.00 78,077,844.00
Rangka Plafon Kayu Kls II M3 4.87 130,009.00 633,143.83
List Plafon M1 572.00 79,211.00 45,308,692.00

PEKERJAAN PENGECATAN
Cat Dinding Baru M2 1,134.00 - -
Cat plafond M2 972.00 - -

PEKERJAAN PENGGANTUNG
Kunci Tanam Dua Slak BH 18.00 492,497.00 8,864,946.00
Engsel Pintu BH 54.00 71,434.00 3,857,436.00
Engsel Jendela/Ventilasi Psg 258.00 53,666.00 13,845,828.00
Hak Angin Stainles Stel Psg 129.00 76,546.00 9,874,434.00
Grendel Jendela Psg 129.00 76,546.00 9,874,434.00

PEKERJAAN ATAP
Atap Genteng Metal Rainbouw M2 1,101.06 - -
Rangka Kuda Kuda Kayu Kls I M3 2.49 8,683,647.00 21,587,546.44
Gording Kayu Kls II M3 3.56 8,335,937.00 29,680,937.28
Bumbungan Atap Zenk Licin 0.25 M1 94.00 58,751.00 5,522,594.00
Papan Lisplank M1 312.00 132,907.00 41,466,984.00

REHABILITASI TOILET B. 5
PEKERJAAN PEMBONGKARAN
Keramik Ls 1.00 1,000,000.00 1,000,000.00
Plafon Ls 1.00 1,000,000.00 1,000,000.00
Atap Senk BJLS 0.25 Ls 1.00 1,500,000.00 1,500,000.00
PEKERJAAN KERAMIK
Lantai Keramik 20 x 20 Anti Slip M2 78.00 236,126.00 18,417,828.00
PEKERJAAN PLAFOND
Plafond Gipsum Bord M2 78.00 80,327.00
Rangka Plafon Kayu Kls II M3 0.10 130,009.00 13,520.94
List Plafon Gipsum M1 34.00 79,211.00 2,693,174.00

PEKERJAAN PENGECATAN
Cat Dinding Lama M2 21.00 56,952.00 1,195,992.00
Cat plafond M2 78.00 56,952.00 4,442,256.00
PAGAR SEKOLAH
PEKERJAAN AWAL/PERSIAPAN
Pekerjaan Pengukuran dan Bouwplank Ls 1.00 2,500,000.00 2,500,000.00
PEKERJAAN TANAH
Pekerjaan Galian Tanah Pondasi Batu Kali M3 117.09 103,812.00 12,155,347.08
Urugan Tanah Kembali M3 84.99 37,812.00 3,213,641.88
Urug Pasir Bawah Pondasi M3 5.84 576,125.00 3,364,570.00

PEKERJAAN PASANGAN DAN PLESTERAN


Pasangan Batu Kosong M3 14.64 - -
Pasangan Pondasi Batu Kali ad. 1 4 M3 38.78 - -
Pasangan Batu Bata 1 4 M2 568.79 - -
Plester Dinding ad 1 4 M2 568.79 - -
PEKERJAAN BETON
Sloof Beton 15/20 Camp. 123 (177.12 Kg/M3) M3 9.75 - -
Kolom Beton 20/20 Camp. 123 ( 135.45 Kg/M3) M3 55.16 - -
Ring Balok Beton 15/20 Camp. 123 (177.12 Kg/M3) M3 9.75 - -
PEKERJAAN PENGECATAN
Cat Dinding Baru (Setara Nipon Paint) M2 527.82 - -
Acian M2 527.82 - -

PEKERJAAN GAPURA
PEK. AWAL/PERSIAPAN
Pekerjaan Pengukuran dan Bouwplank Ls 1.00 - -

PEKERJAAN TANAH
Pekerjaan Galian Tanah Pondasi Floor Plat M3 2.00 - -
Urugan Tanah Kembali M3 0.67 - -
Urugan tanah Bawah Lantai M3 0.20 - -

PEKERJAAN BETON
Poor Plate (Telapak) M3 0.08
Dinding Beton M3 1.33 - -
Kolom Beton 25/25 cm M3 0.42 - -

PEMBESIAN
Tulangan dia. 16 kg 123.00 - -
Tulangan dia. 12 kg 122,45 - -
Tulangan dia. 8 kg 64,18 - #VALUE!

LAPANGAN VOLI
PEK. BETON
Rabat Beton ad. 1 3 5 t = 10 cm M3 16.20 1,390,622.00 -

GAZEBO
PEK. GAZEBO UNIT 1.00 - #REF!

PEKERJAAN AKHIR
Pembersihan Akhir Ls 1.00 1,500,000.00 #REF!
Dokumentasi dan Pelaporan Ls 1.00 3,500,000.00 #REF!
Asbuild Drawing Ls 1.00 3,000,000.00 #REF!
PEKERJAAN PENGADAAN K3
Alat Pelindung Diri (APD)
Topi Pelindung (Safet Helmet) Bh 45.00 115,000.00 -
Pelindung Pernapasan Pcs 90.00 10,000.00 -
Sarung Tangan (Safety) Pcs 90.00 10,000.00 -
Sepatu tangan (Safety Lars) Bh 45.00 225,000.00 -
Rompi Keselamatan (Sefety Vast Bh 90.00 85,000.00 -
Sabuk Keselamatan (Sefety Belt) Bh 45.00 10,000,000.00 -
Fasilitas Sarana Kesehatan
P3K Set 1.00 3,500,000.00 3,500,000.00
- -
ANALISA HARGA SATUAN
HARGA SATUAN PEKERJAAN PERSIAPAN

HARGA SATUAN PEKERJAAN TANAH


Penggalian 1 m3 tanah biasa sedalam 1 m
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.7500 120,000 90,000.00
Mandor L.04.01 OH 0.0250 175,000 4,375.00
JUMLAH TENAGA KERJA 94,375.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 94,375.00
E Overhead & Profit 10% 10% 9,437.50
F Harga Satuan Pekerjaan (D+E) 103,812.00

Penggalian 1 m3 tanah biasa sedalam 2 m


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01.01 OH 0.9000 120,000 108,000.00
Mandor L.04.01 OH 0.0450 175,000 7,875.00
JUMLAH TENAGA KERJA 115,875.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 115,875.00
E Overhead & Profit 10% 10% 11,587.50
F Harga Satuan Pekerjaan (D+E) 127,462.00

Menggali 1 m3 tanah biasa sedalam 3 m


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01.01 OH 1.0500 120,000 126,000.00
Mandor L.04.01 OH 0.0670 175,000 11,725.00
JUMLAH TENAGA KERJA 137,725.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 137,725.00
E Overhead & Profit 10% 10% 13,772.50
F Harga Satuan Pekerjaan (D+E) 151,497.00

Menggali 1 m3 tanah keras sedalam 1 m


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01.01 OH 1.0000 120,000 120,000.00
Mandor L.04.01 OH 0.0320 175,000 5,600.00
JUMLAH TENAGA KERJA 125,600.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 125,600.00
E Overhead & Profit 10% 10% 12,560.00
F Harga Satuan Pekerjaan (D+E) 138,160.00

Menggali 1 m3 tanah cadas sedalam 1 m


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.5000 120,000 180,000.00
Mandor L.04.01 OH 0.0600 175,000 10,500.00
JUMLAH TENAGA KERJA 190,500.00
B BAHAN - -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 190,500.00
E Overhead & Profit 10% 10% 19,050.00
F Harga Satuan Pekerjaan (D+E) 209,550.00
Pengurugan kembali 1 m3 galian tanah Tanah Biasa Sedalam 1 M
Pengurugan kembali 1 m3 galian dihitung dari 1/3 kali dari koefisien pekerjaan galian
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2500 120,000 30,000.00
Mandor L.04.01 OH 0.0250 175,000 4,375.00
JUMLAH TENAGA KERJA 34,375.00
B BAHAN - -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 34,375.00
E Overhead & Profit 10% 10% 3,437.50
F Harga Satuan Pekerjaan (D+E) 37,812.00

(K3) Pemadatan tanah 1 m3 tanah ( per 20 cm)


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.5000 120,000 60,000.00
Mandor L.04.01 OH 0.0500 175,000 8,750.00
JUMLAH TENAGA KERJA 68,750.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 68,750.00
E Overhead & Profit 10% 10% 6,875.00
F Harga Satuan Pekerjaan (D+E) 75,625.00

Pengurugan 1 m3 dengan pasir urug


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 120,000 36,000.00
Mandor L.04.01 OH 0.0100 175,000 1,750.00
JUMLAH TENAGA KERJA 37,750.00
B BAHAN
Pasir urug M3 1.2000 405,000 486,000.00
JUMLAH HARGA BAHAN 486,000.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 523,750.00
E Overhead & Profit 10% 10% 52,375.00
F Harga Satuan Pekerjaan (D+E) 576,125.00

Pengurugan 1 m3 sirtu padat


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2500 120,000 30,000.00
Mandor L.04.01 OH 0.0250 175,000 4,375.00
JUMLAH TENAGA KERJA 34,375.00
B BAHAN
Sirtu m3 1.2000 235,000 282,000.00
JUMLAH HARGA BAHAN 282,000.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 316,375.00
E Overhead & Profit 10% 10% 31,637.50
F Harga Satuan Pekerjaan (D+E) 348,012.00
HARGA SATUAN PEKERJAAN PONDASI
Pemasangan 1 m3 pondasi batu belah campuran 1SP : 3PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.5000 120,000 180,000.00
Tukang Batu L.02.03 OH 0.7500 135,000 101,250.00
Kepala Tukang L.03.01 OH 0.0750 150,000 11,250.00
Mandor L.04.01 OH 0.0750 175,000 13,125.00
JUMLAH TENAGA KERJA 305,625.00
B BAHAN
Batu belah m3 1.2000 415,000 498,000.00
Semen portland Kg 202.0000 1,700 343,400.00
Pasir Pasang m3 0.4850 405,000 196,425.00
JUMLAH HARGA BAHAN 1,037,825.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,343,450.00
E Overhead & Profit 10% 10% 134,345.00
F Harga Satuan Pekerjaan (D+E) 1,477,795.00

Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.5000 120,000 180,000.00
Tukang Batu L.02.03 OH 0.7500 135,000 101,250.00
Kepala Tukang L.03.01 OH 0.0750 150,000 11,250.00
Mandor L.04.01 OH 0.0750 175,000 13,125.00
JUMLAH TENAGA KERJA 305,625.00
B BAHAN - -
Batu belah m3 1.2000 415,000 498,000.00
Semen portland Kg 163.0000 1,700 277,100.00
Pasir Pasang m3 0.5200 405,000 210,600.00
JUMLAH HARGA BAHAN 985,700.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1,291,325.00
E Overhead & Profit 10% 10% 129,132.50
F Harga Satuan Pekerjaan (D+E) - 1,420,457.00

Pemasangan 1 m3 pondasi batu belah campuran 1SP : 5PP


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.5000 120,000 180,000.00
Tukang Batu L.02.03 OH 0.7500 135,000 101,250.00
Kepala Tukang L.03.01 OH 0.0750 150,000 11,250.00
Mandor L.04.01 OH 0.0750 175,000 13,125.00
JUMLAH TENAGA KERJA 305,625.00
B BAHAN - -
Batu belah m3 1.2000 415,000 498,000.00
Semen portland Kg 136.0000 1,700 231,200.00
Pasir Pasang m3 0.5440 405,000 220,320.00
JUMLAH HARGA BAHAN 949,520.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1,255,145.00
E Overhead & Profit 10% 10% 125,514.50
F Harga Satuan Pekerjaan (D+E) - 1,380,659.00

Pemasangan 1 m3 batu kosong (anstamping)


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.7800 120,000 93,600.00
Tukang Batu L.02.03 OH 0.3900 135,000 52,650.00
Kepala Tukang L.03.01 OH 0.0390 150,000 5,850.00
Mandor L.04.01 OH 0.0390 175,000 6,825.00
JUMLAH TENAGA KERJA 158,925.00
B BAHAN
Batu belah m3 1.2000 415,000 498,000.00
Pasir urug m3 0.4320 405,000 174,960.00
JUMLAH HARGA BAHAN 672,960.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 831,885.00
E Overhead & Profit 10% 10% 83,188.50
F Harga Satuan Pekerjaan (D+E) - 915,073.00
HARGA SATUAN PEKERJAAN BETON
Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.6500 120,000 198,000.00
Tukang Batu L.02.03 OH 0.2750 135,000 37,125.00
Kepala Tukang L.03.01 OH 0.0280 150,000 4,200.00
Mandor L.04.01 OH 0.0830 175,000 14,525.00
JUMLAH TENAGA KERJA 253,850.00
B BAHAN
Semen portland kg 247.0000 1,700 419,900.00
Pasir Beton kg 869.0000 289.29 251,389.29
Kerikil (Maks 30 mm) kg 999.0000 370.37 370,000.00
Air Liter 215.0000 250.00 53,750.00
JUMLAH HARGA BAHAN 1,095,039.29
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1,348,889.29
E Overhead & Profit 10% 10% 134,888.93
F Harga Satuan Pekerjaan (D+E) - 1,483,778.00

Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (3-6) cm, w/c = 0,87
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.2000 120,000 144,000.00
Tukang Batu L.02.03 OH 0.2000 135,000 27,000.00
Kepala Tukang L.03.01 OH 0.0200 150,000 3,000.00
Mandor L.04.01 OH 0.0600 175,000 10,500.00
JUMLAH TENAGA KERJA 184,500.00
B BAHAN
Semen portland kg 230.0000 1,700 391,000.00
Pasir Beton kg 893.0000 289.29 258,332.14
Kerikil (Maks 30 mm) kg 1027.0000 370.37 380,370.37
Air Liter 200.0000 250.00 50,000.00
JUMLAH HARGA BAHAN 1,079,702.51
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1,264,202.51
E Overhead & Profit 10% 10% 126,420.25
F Harga Satuan Pekerjaan (D+E) - 1,390,622.00

Membuat 1 m3 beton mutu f’ = 14,5 MPa (K 175), slump (12 ±2) cm, w/c = 0,66
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.6500 120,000 198,000.00
Tukang Batu L.02.03 OH 0.2750 135,000 37,125.00
Kepala Tukang L.03.01 OH 0.0280 150,000 4,200.00
Mandor L.04.01 OH 0.0830 175,000 14,525.00
JUMLAH TENAGA KERJA 253,850.00
B BAHAN
Semen portland kg 326.0000 1,700 554,200.00
Pasir Beton kg 760.0000 289.29 219,857.14
Kerikil (Maks 30 mm) kg 1029.0000 370.37 381,111.11
Air Liter 215.0000 250.00 53,750.00
JUMLAH HARGA BAHAN 1,208,918.25
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1,462,768.25
E Overhead & Profit 10% 10% 146,276.83
F Harga Satuan Pekerjaan (D+E) - 1,609,045.00
Membuat 1 m3 beton mutu f’= 16,9 MPa (K 200), slump (120 ± 20) mm, w/c = 0,61
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.6500 120,000 198,000.00
Tukang Batu L.02.03 OH 0.2750 135,000 37,125.00
Kepala Tukang L.03.01 OH 0.0280 150,000 4,200.00
Mandor L.04.01 OH 0.0830 175,000 14,525.00
JUMLAH TENAGA KERJA 253,850.00
B BAHAN
Semen portland kg 352.0000 1,700 598,400.00
Pasir Beton kg 731.0000 289.29 211,467.86
Kerikil (Maks 30 mm) kg 1031.0000 370.37 381,851.85
Air Liter 215.0000 250.00 53,750.00
JUMLAH HARGA BAHAN 1,245,469.71
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1,499,319.71
E Overhead & Profit 10% 10% 149,931.97
F Harga Satuan Pekerjaan (D+E) - 1,649,251.00

Membuat 1 m3 beton mutu f’ = 19,3 MPa (K 225), slump (120 ± 20) mm, w/c = 0,58
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.6500 120,000 198,000.00
Tukang Batu L.02.03 OH 0.2750 135,000 37,125.00
Kepala Tukang L.03.01 OH 0.0280 150,000 4,200.00
Mandor L.04.01 OH 0.0830 175,000 14,525.00
JUMLAH TENAGA KERJA 253,850.00
B BAHAN
Semen portland kg 371.0000 1,700 630,700.00
Pasir Beton kg 698.0000 289.29 201,921.43
Kerikil (Maks 30 mm) kg 1047.0000 370.37 387,777.78
Air Liter 215.0000 250.00 53,750.00
JUMLAH HARGA BAHAN 1,274,149.21
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1,527,999.21
E Overhead & Profit 10% 10% 152,799.92
F Harga Satuan Pekerjaan (D+E) - 1,680,799.00

Membuat 1 m3 beton mutu f’= 21,7 MPa (K 250), slump (120 ± 20) mm, w/c = 0,56
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.6500 120,000 198,000.00
Tukang Batu L.02.03 OH 0.2750 135,000 37,125.00
Kepala Tukang L.03.01 OH 0.0280 150,000 4,200.00
Mandor L.04.01 OH 0.0830 175,000 14,525.00
JUMLAH TENAGA KERJA 253,850.00
B BAHAN
Semen portland kg 384.0000 1,700 652,800.00
Pasir Beton kg 692.0000 289.29 200,185.71
Kerikil (Maks 30 mm) kg 1039.0000 370.37 384,814.81
Air Liter 215.0000 250.00 53,750.00
JUMLAH HARGA BAHAN 1,291,550.53
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1,545,400.53
E Overhead & Profit 10% 10% 154,540.05
F Harga Satuan Pekerjaan (D+E) - 1,699,940.00

Pembesian 10 kg dengan besi polos atau besi ulir


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0700 120,000 8,400.00
Tukang Besi L.02.05 OH 0.0700 135,000 9,450.00
Kepala Tukang L.03.01 OH 0.0070 150,000 1,050.00
Mandor L.04.01 OH 0.0040 175,000 700.00
JUMLAH TENAGA KERJA 19,600.00
B BAHAN
Besi beton (polos/ulir) kg 10.5000 15,000 157,500.00
Kawat beton kg 0.1500 27,500 4,125.00
JUMLAH HARGA BAHAN 161,625.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 181,225.00
E Overhead & Profit 10% 10% 18,122.50
F Harga Satuan Pekerjaan (D+E) - 199,347.00
(K3) Pemasangan 1 m2 bekisting untuk pondasi
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.5200 120,000 62,400.00
Tukang Kayu L.02.04 OH 0.2600 135,000 35,100.00
Kepala Tukang L.03.01 OH 0.0260 150,000 3,900.00
Mandor L.04.01 OH 0.0260 175,000 4,550.00
JUMLAH TENAGA KERJA 105,950.00
B BAHAN
Kayu kelas II m3 0.0400 2,550,000 102,000.00
Paku 5 - 10 cm kg 0.3000 23,500 7,050.00
Minyak bekisting Liter 0.1000 -
JUMLAH HARGA BAHAN 109,050.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 215,000.00
E Overhead & Profit 10% 10% 21,500.00
F Harga Satuan Pekerjaan (D+E) - 236,500.00

(K3) Pemasangan 1 m2 bekisting untuk sloof


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.5200 120,000 62,400.00
Tukang Kayu L.02.04 OH 0.2600 135,000 35,100.00
Kepala Tukang L.03.01 OH 0.0260 150,000 3,900.00
Mandor L.04.01 OH 0.0260 175,000 4,550.00
JUMLAH TENAGA KERJA 105,950.00
B BAHAN
Kayu kelas III m3 0.0450 2,550,000 114,750.00
Paku 5 - 10 cm kg 0.3000 23,500 7,050.00
Minyak bekisting Liter 0.1000 -
JUMLAH HARGA BAHAN 121,800.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 227,750.00
E Overhead & Profit 10% 10% 22,775.00
F Harga Satuan Pekerjaan (D+E) - 250,525.00

(K3) Pemasangan 1 m2 bekisting untuk kolom


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.6600 120,000 79,200.00
Tukang Kayu L.02.04 OH 0.3300 135,000 44,550.00
Kepala Tukang L.03.01 OH 0.0330 150,000 4,950.00
Mandor L.04.01 OH 0.0330 175,000 5,775.00
JUMLAH TENAGA KERJA 134,475.00
B BAHAN
Kayu kelas III m3 0.0400 2,550,000 102,000.00
Paku 5 - 12 cm kg 0.4000 23,500 9,400.00
Minyak bekisting Liter 0.2000 -
Balok kayu kelas II m3 0.0150 2,550,000 38,250.00
Plywood 9 mm Lbr 0.3500 155,000 54,250.00
Dolken kayu Ø 8-10/400 cm Batang 2.0000 -
JUMLAH HARGA BAHAN 203,900.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 338,375.00
E Overhead & Profit 10% 10% 33,837.50
F Harga Satuan Pekerjaan (D+E) - 372,212.00

(K3) Pemasangan 1 m2 bekisting untuk balok


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.6600 120,000 79,200.00
Tukang Kayu L.02.04 OH 0.3300 135,000 44,550.00
Kepala Tukang L.03.01 OH 0.0330 150,000 4,950.00
Mandor L.04.01 OH 0.0330 175,000 5,775.00
JUMLAH TENAGA KERJA 134,475.00
B BAHAN
Kayu kelas III m3 0.0400 2,550,000 102,000.00
Paku 5 - 12 cm kg 0.4000 23,500 9,400.00
Minyak bekisting Liter 0.2000 -
Balok kayu kelas II m3 0.0180 2,550,000 45,900.00
Plywood 9 mm Lbr 0.3500 155,000 54,250.00
Dolken kayu Ø 8-10/400 cm Batang 2.0000 -
JUMLAH HARGA BAHAN 211,550.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 346,025.00
E Overhead & Profit 10% 10% 34,602.50
F Harga Satuan Pekerjaan (D+E) - 380,627.00

(K3) Pemasangan 1 m2 bekisting untuk lantai


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.6600 120,000 79,200.00
Tukang Kayu L.02.04 OH 0.3300 135,000 44,550.00
Kepala Tukang L.03.01 OH 0.0330 150,000 4,950.00
Mandor L.04.01 OH 0.0330 175,000 5,775.00
JUMLAH TENAGA KERJA 134,475.00
B BAHAN
Kayu kelas III m3 0.0400 2,550,000 102,000.00
Paku 5 - 12 cm kg 0.4000 23,500 9,400.00
Minyak bekisting Liter 0.2000 -
Balok kayu kelas II m3 0.0150 2,550,000 38,250.00
Plywood 9 mm Lbr 0.3500 155,000 54,250.00
Dolken kayu Ø 8-10/400 cm Batang 6.0000 -
JUMLAH HARGA BAHAN 203,900.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 338,375.00
E Overhead & Profit 10% 10% 33,837.50
F Harga Satuan Pekerjaan (D+E) - 372,212.00

(K3) Pemasangan 1 m2 bekisting untuk tangga


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.6600 120,000 79,200.00
Tukang Kayu L.02.04 OH 0.3300 135,000 44,550.00
Kepala Tukang L.03.01 OH 0.0330 150,000 4,950.00
Mandor L.04.01 OH 0.0330 175,000 5,775.00
JUMLAH TENAGA KERJA 134,475.00
B BAHAN
Kayu kelas III m3 0.0300 2,550,000 76,500.00
Paku 5 - 12 cm kg 0.4000 23,500 9,400.00
Minyak bekisting Liter 0.1500 -
Balok kayu kelas II m3 0.0150 2,550,000 38,250.00
Plywood 9 mm Lbr 0.3500 155,000 54,250.00
Dolken kayu Ø 8-10/400 cm Batang 2.0000 -
JUMLAH HARGA BAHAN 178,400.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 312,875.00
E Overhead & Profit 10% 10% 31,287.50
F Harga Satuan Pekerjaan (D+E) - 344,162.00

Beton Sloof Pembesian Kg Beton Bakesting Jumlah


15/20 3,530,900.49 177.12 1,680,799.00 250,525 5,462,224.49

Beton Kolom Pembesian Kg Beton Bakesting Jumlah


20/20 2,701,030.44 135.49 1,680,799.00 372,212 4,754,041.44

Beton Balok Pembesian Kg Beton Bakesting Jumlah


15/20 3,530,900.49 177.12 1,680,799.00 380,627 5,592,326.49

Beton Kolom Pembesian Kg Beton Bakesting Jumlah


60/30 1,217,375.68 61.07 1,680,799.00 372,212 3,270,386.68

Beton Balok Pembesian Kg Beton Bakesting Jumlah


15/15 4,474,331.69 224.45 1,680,799.00 380,627 6,535,757.69

Beton Kolom Pembesian Kg Beton Bakesting Jumlah


20/25 4,474,331.69 224.45 1,680,799.00 372,212 6,527,342.69

Beton Pondasi Pembesian Kg Beton Bakesting Jumlah


20/25 1,550,371.95 77.77 1,680,799.00 236,500 3,467,670.95

Beton Kolom Pembesian Kg Beton Bakesting Jumlah


15/15 3,530,900.49 177.12 1,680,799.00 372,212 5,583,911.49
Pemasangan 1 m’ talang datar/ jurai seng bjls 28 lebar 90 cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2000 120,000 24,000.00
Tukang L.02.01 OH 0.2000 135,000 27,000.00
Kepala tukang L.03.01 OH 0.0200 150,000 3,000.00
Mandor L.04.01 OH 0.0010 175,000 175.00
JUMLAH TENAGA KERJA 54,175.00
B BAHAN
Seng plat m 1.0500 76,400 80,220.00
Paku Biasa kg 0.0150 23,500 352.50
Kayu Papan kelas II m3 0.0190 2,550,000 48,450.00
JUMLAH HARGA BAHAN 129,022.50
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 183,197.50
E Overhead & Profit 10% 10% 18,319.75
F Harga Satuan Pekerjaan (D+E) - 201,517.00

Pemasangan 1 M2 PASANG KUDA-KUDA BAJA RINGAN + RENG UNTUK ATAP GENTENG BIASA/METAL
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2000 120,000 24,000.00
Tukang Besi L.02.05 OH 0.4500 135,000 60,750.00
Kepala Tukang L.03.01 OH 0.0100 150,000 1,500.00
Mandor L.04.01 OH 0.0500 175,000 8,750.00
JUMLAH TENAGA KERJA 95,000.00
B BAHAN
Baja ringan canai dingin C75 M' 3.7200 20,833 77,500.00
Baut (Srew driver) bh 28.0000 3,500 98,000.00
Dynabol dia 12 x 120 mm bh 2.0000 4,500 9,000.00
Reng Canai Dingin M' 5.4000 9,583 51,750.00
Talang / Jurai Canai Dingin M' 0.1240 4,167 516.67
JUMLAH HARGA BAHAN 236,766.67
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 331,766.67
E Overhead & Profit 10% 10% 33,176.67
F Harga Satuan Pekerjaan (D+E) 364,943.00

HARGA SATUAN PEKERJAAN PASANGAN DINDING


Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 2 PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.6000 120,000 72,000.00
Tukang Batu L.02.03 OH 0.2000 135,000 27,000.00
Kepala Tukang L.03.01 OH 0.0200 150,000 3,000.00
Mandor L.04.01 OH 0.0300 175,000 5,250.00
JUMLAH TENAGA KERJA 107,250.00
B BAHAN
Bata merah m3 140.0000 1,500 210,000.00
Semen portland Kg 43.5000 1,700 73,950.00
Pasir Pasang m3 0.0800 405,000 32,400.00
JUMLAH HARGA BAHAN 316,350.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 423,600.00
E Overhead & Profit 10% 10% 42,360.00
F Harga Satuan Pekerjaan (D+E) - 465,960.00
Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 3 PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.6000 120,000 72,000.00
Tukang Batu L.02.03 OH 0.2000 135,000 27,000.00
Kepala Tukang L.03.01 OH 0.0200 150,000 3,000.00
Mandor L.04.01 OH 0.0300 175,000 5,250.00
JUMLAH TENAGA KERJA 107,250.00
B BAHAN
Bata merah m3 140.0000 1,500 210,000.00
Semen portland Kg 32.9500 1,700 56,015.00
Pasir Pasang m3 0.0910 405,000 36,855.00
JUMLAH HARGA BAHAN 302,870.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 410,120.00
E Overhead & Profit 10% 10% 41,012.00
F Harga Satuan Pekerjaan (D+E) - 451,132.00

Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 4 PP


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.6000 120,000 72,000.00
Tukang Batu L.02.03 OH 0.2000 135,000 27,000.00
Kepala Tukang L.03.01 OH 0.0200 150,000 3,000.00
Mandor L.04.01 OH 0.0300 175,000 5,250.00
JUMLAH TENAGA KERJA 107,250.00
B BAHAN
Bata merah m3 140.0000 1,500 210,000.00
Semen portland Kg 26.5500 1,700 45,135.00
Pasir Pasang m3 0.0930 405,000 37,665.00
JUMLAH HARGA BAHAN 292,800.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 400,050.00
E Overhead & Profit 10% 10% 40,005.00
F Harga Satuan Pekerjaan (D+E) - 440,055.00

Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 5 PP


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.6000 120,000 72,000.00
Tukang Batu L.02.03 OH 0.2000 135,000 27,000.00
Kepala Tukang L.03.01 OH 0.0200 150,000 3,000.00
Mandor L.04.01 OH 0.0300 175,000 5,250.00
JUMLAH TENAGA KERJA 107,250.00
B BAHAN
Bata merah m3 140.0000 1,500 210,000.00
Semen portland Kg 22.2000 1,700 37,740.00
Pasir Pasang m3 0.1020 405,000 41,310.00
JUMLAH HARGA BAHAN 289,050.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 396,300.00
E Overhead & Profit 10% 10% 39,630.00
F Harga Satuan Pekerjaan (D+E) - 435,930.00

Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 2PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 120,000 36,000.00
Tukang Batu L.02.03 OH 0.1000 135,000 13,500.00
Kepala Tukang L.03.01 OH 0.0100 150,000 1,500.00
Mandor L.04.01 OH 0.0150 175,000 2,625.00
JUMLAH TENAGA KERJA 53,625.00
B BAHAN
Bata merah m3 70.0000 1,500 105,000.00
Semen portland Kg 18.9500 1,700 32,215.00
Pasir Pasang m3 0.0380 405,000 15,390.00
JUMLAH HARGA BAHAN 152,605.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 206,230.00
E Overhead & Profit 10% 10% 20,623.00
F Harga Satuan Pekerjaan (D+E) - 226,853.00
Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 3PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 120,000 36,000.00
Tukang Batu L.02.03 OH 0.1000 135,000 13,500.00
Kepala Tukang L.03.01 OH 0.0100 150,000 1,500.00
Mandor L.04.01 OH 0.0150 175,000 2,625.00
JUMLAH TENAGA KERJA 53,625.00
B BAHAN
Bata merah m3 70.0000 1,500 105,000.00
Semen portland Kg 14.3700 1,700 24,429.00
Pasir Pasang m3 0.0400 405,000 16,200.00
JUMLAH HARGA BAHAN 145,629.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 199,254.00
E Overhead & Profit 10% 10% 19,925.40
F Harga Satuan Pekerjaan (D+E) - 219,179.00

Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :4PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 120,000 36,000.00
Tukang Batu L.02.03 OH 0.1000 135,000 13,500.00
Kepala Tukang L.03.01 OH 0.0100 150,000 1,500.00
Mandor L.04.01 OH 0.0150 175,000 2,625.00
JUMLAH TENAGA KERJA 53,625.00
B BAHAN
Bata merah m3 70.0000 1,500 105,000.00
Semen portland Kg 11.5000 1,700 19,550.00
Pasir Pasang m3 0.0430 405,000 17,415.00
JUMLAH HARGA BAHAN 141,965.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 195,590.00
E Overhead & Profit 10% 10% 19,559.00
F Harga Satuan Pekerjaan (D+E) - 215,149.00

HARGA SATUAN PEKERJAAN PLESTERAN


Pemasangan 1 m2 plesteran 1SP : 1PP tebal 15 mm.
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 120,000 36,000.00
Tukang Batu L.02.03 OH 0.1500 135,000 20,250.00
Kepala Tukang L.03.01 OH 0.0150 150,000 2,250.00
Mandor L.04.01 OH 0.0150 175,000 2,625.00
JUMLAH TENAGA KERJA 61,125.00
B BAHAN
Semen portland Kg 15.5040 1,700 26,356.80
Pasir Pasang m3 0.0160 405,000 6,480.00
JUMLAH HARGA BAHAN 32,836.80
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 93,961.80
E Overhead & Profit 10% 10% 9,396.18
F Harga Satuan Pekerjaan (D+E) - 103,357.00
Pemasangan 1 m2 plesteran 1SP : 2PP tebal 15 mm.
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 120,000 36,000.00
Tukang Batu L.02.03 OH 0.1500 135,000 20,250.00
Kepala Tukang L.03.01 OH 0.0150 150,000 2,250.00
Mandor L.04.01 OH 0.0150 175,000 2,625.00
JUMLAH TENAGA KERJA 61,125.00
B BAHAN
Semen portland Kg 10.2240 1,700 17,380.80
Pasir Pasang m3 0.0200 405,000 8,100.00
JUMLAH HARGA BAHAN 25,480.80
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 86,605.80
E Overhead & Profit 10% 10% 8,660.58
F Harga Satuan Pekerjaan (D+E) - 95,266.00

Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15mm.


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 120,000 36,000.00
Tukang Batu L.02.03 OH 0.1500 135,000 20,250.00
Kepala Tukang L.03.01 OH 0.0150 150,000 2,250.00
Mandor L.04.01 OH 0.0150 175,000 2,625.00
JUMLAH TENAGA KERJA 61,125.00
B BAHAN
Semen portland Kg 7.7760 1,700 13,219.20
Pasir Pasang m3 0.0230 405,000 9,315.00
JUMLAH HARGA BAHAN 22,534.20
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 83,659.20
E Overhead & Profit 10% 10% 8,365.92
F Harga Satuan Pekerjaan (D+E) - 92,025.00

Pemasangan 1 m2 plesteran 1SP : 4PP tebal 15 mm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 120,000 36,000.00
Tukang Batu L.02.03 OH 0.1500 135,000 20,250.00
Kepala Tukang L.03.01 OH 0.0150 150,000 2,250.00
Mandor L.04.01 OH 0.0150 175,000 2,625.00
JUMLAH TENAGA KERJA 61,125.00
B BAHAN
Semen portland Kg 6.2400 1,700 10,608.00
Pasir Pasang m3 0.0240 405,000 9,720.00
JUMLAH HARGA BAHAN 20,328.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 81,453.00
E Overhead & Profit 10% 10% 8,145.30
F Harga Satuan Pekerjaan (D+E) - 89,598.00

Pemasangan 1 m2 plesteran 1SP : 5PP tebal 15 mm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 120,000 36,000.00
Tukang Batu L.02.03 OH 0.1500 135,000 20,250.00
Kepala Tukang L.03.01 OH 0.0150 150,000 2,250.00
Mandor L.04.01 OH 0.0150 175,000 2,625.00
JUMLAH TENAGA KERJA 61,125.00
B BAHAN
Semen portland Kg 5.1840 1,700 8,812.80
Pasir Pasang m3 0.0260 405,000 10,530.00
JUMLAH HARGA BAHAN 19,342.80
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 80,467.80
E Overhead & Profit 10% 10% 8,046.78
F Harga Satuan Pekerjaan (D+E) - 88,514.00
Pemasangan 1 m2 acian.
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2000 120,000 24,000.00
Tukang Batu L.02.03 OH 0.1000 135,000 13,500.00
Kepala Tukang L.03.01 OH 0.0100 150,000 1,500.00
Mandor L.04.01 OH 0.0100 175,000 1,750.00
JUMLAH TENAGA KERJA 40,750.00
B BAHAN
Semen portland Kg 3.2500 1,700 5,525.00
JUMLAH HARGA BAHAN 5,525.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 46,275.00
E Overhead & Profit 10% 10% 4,627.50
F Harga Satuan Pekerjaan (D+E) - 50,902.00

Pemasangan 1m2 lantai ubin warna ukuran 30cm x30cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2600 120,000 31,200.00
Tukang Batu L.02.03 OH 0.1300 135,000 17,550.00
Kepala tukang L.03.01 OH 0.0130 150,000 1,950.00
Mandor L.04.01 OH 0.0130 175,000 2,275.00
JUMLAH TENAGA KERJA 52,975.00
B BAHAN
ubin warna ukuran 30cm x30cm Bh 11.8700 10,350 122,854.50
Semen portland kg 10.0000 1,700 17,000.00
Semen Warna Kg 1.5000 3,000 4,500.00
Pasir Pasang M3 0.0450 405,000 18,225.00
JUMLAH HARGA BAHAN 162,579.50
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 215,554.50
E Overhead & Profit 10% 10% 21,555.45
F Harga Satuan Pekerjaan (D+E) - 237,109.00

Pemasangan 1m2 lantai ubin warna ukuran 20cm x20cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2700 120,000 32,400.00
Tukang Batu L.02.03 OH 0.1350 135,000 18,225.00
Kepala tukang L.03.01 OH 0.0140 150,000 2,100.00
Mandor L.04.01 OH 0.0140 175,000 2,450.00
JUMLAH TENAGA KERJA 55,175.00
B BAHAN
ubin warna ukuran 20cm x20cm Bh 26.5000 4,480 118,720.00
Semen portland kg 10.4000 1,700 17,680.00
Semen Warna Kg 1.6200 3,000 4,860.00
Pasir Pasang M3 0.0450 405,000 18,225.00
JUMLAH HARGA BAHAN 159,485.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 214,660.00
E Overhead & Profit 10% 10% 21,466.00
F Harga Satuan Pekerjaan (D+E) - 236,126.00

Pemasangan 1m2 lantai ubin granit ukuran 40cm x40cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2500 120,000 30,000.00
Tukang Batu L.02.03 OH 0.1250 135,000 16,875.00
Kepala tukang L.03.01 OH 0.0130 150,000 1,950.00
Mandor L.04.01 OH 0.0130 175,000 2,275.00
JUMLAH TENAGA KERJA 51,100.00
B BAHAN
ubin granit ukuran 40cm x40cm Bh 6.6300 20,800 137,904.00
Semen portland kg 9.8000 1,700 16,660.00
Semen Warna Kg 1.3000 3,000 3,900.00
Pasir Pasang M3 0.0450 405,000 18,225.00
JUMLAH HARGA BAHAN 176,689.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 227,789.00
E Overhead & Profit 10% 10% 22,778.90
F Harga Satuan Pekerjaan (D+E) - 250,567.00
Pemasangan 1m2 lantai ubin granit ukuran 30cm x30cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2600 120,000 31,200.00
Tukang Batu L.02.03 OH 0.1300 135,000 17,550.00
Kepala tukang L.03.01 OH 0.0130 150,000 1,950.00
Mandor L.04.01 OH 0.0130 175,000 2,275.00
JUMLAH TENAGA KERJA 52,975.00
B BAHAN
ubin granit ukuran 30cm x30cm Bh 11.8700 8,730 103,625.10
Semen portland kg 10.0000 1,700 17,000.00
Semen Warna Kg 1.5000 3,000 4,500.00
Pasir Pasang M3 0.0450 405,000 18,225.00
JUMLAH HARGA BAHAN 143,350.10
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 196,325.10
E Overhead & Profit 10% 10% 19,632.51
F Harga Satuan Pekerjaan (D+E) - 215,957.00

Pemasangan 1 m’ plint ubin warna ukuran 10cm x 20cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0900 120,000 10,800.00
Tukang Batu L.02.03 OH 0.0900 135,000 12,150.00
Kepala tukang L.03.01 OH 0.0090 150,000 1,350.00
Mandor L.04.01 OH 0.0050 175,000 875.00
JUMLAH TENAGA KERJA 25,175.00
B BAHAN
Plint ubin warna ukuran 10cm x 20cm Bh 2.6500 2,200 5,830.00
Semen portland kg 1.1400 1,700 1,938.00
Semen Warna Kg 0.1000 3,000 300.00
Pasir Pasang M3 0.0030 405,000 1,215.00
JUMLAH HARGA BAHAN 9,283.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 34,458.00
E Overhead & Profit 10% 10% 3,445.80
F Harga Satuan Pekerjaan (D+E) - 37,903.00

Pasang 1 M2 Lantai Keramik Uk. 60 x 60 cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2500 120,000 30,000.00
Tukang Batu L.02.03 OH 0.1250 135,000 16,875.00
Kepala tukang L.03.01 OH 0.0130 150,000 1,950.00
Mandor L.04.01 OH 0.0130 175,000 2,275.00
JUMLAH TENAGA KERJA 51,100.00
B BAHAN
Lantai Keramik 60 x 60 Bh 6.6300 55,333 366,860.00
Semen portland Kg 9.8000 1,700 16,660.00
Pasir Pasang M3 0.0450 405,000 18,225.00
Semen Warna Kg 1.3000 3,000 3,900.00
JUMLAH HARGA BAHAN 405,645.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 456,745.00
E Overhead & Profit 10% 10% 45,674.50
F Harga Satuan Pekerjaan (D+E) - 502,419.00

Pemasangan 1 m2 dinding batu alam


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.7000 120,000 84,000.00
Tukang Batu L.02.03 OH 0.3500 135,000 47,250.00
Kepala tukang L.03.01 OH 0.0350 150,000 5,250.00
Mandor L.04.01 OH 0.0350 175,000 6,125.00
JUMLAH TENAGA KERJA 142,625.00
B BAHAN
Batu alam m2 1.1000 325,000 357,500.00
Semen portland Kg 11.7500 1,700 19,975.00
Pasir Pasang M3 0.0350 405,000 14,175.00
JUMLAH HARGA BAHAN 391,650.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 534,275.00
E Overhead & Profit 10% 10% 53,427.50
F Harga Satuan Pekerjaan (D+E) 587,702.00
Pemasangan 1 m2 paving block natural tebal 6 cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2500 120,000 30,000.00
Tukang Kayu L.02.04 OH 0.2500 135,000 33,750.00
Kepala tukang L.03.01 OH 0.0250 150,000 3,750.00
Mandor L.04.01 OH 0.0025 175,000 437.50
JUMLAH TENAGA KERJA 67,937.50
B BAHAN
Paving block 6 cm M2 1.0100 185,000 186,850.00
Pasir beton M3 0.0500 405,000 20,250.00
JUMLAH HARGA BAHAN 207,100.00
C PERALATAN -
Peralatan Kerja Paving Blok % 0.1000 207,100 20,710.00
JUMLAH HARGA ALAT 20,710.00
D Jumlah (A+B+C) - 295,747.50
E Overhead & Profit 10% 10% 29,574.75
F Harga Satuan Pekerjaan (D+E) - 325,322.00

Pemasangan 1 m2 paving block natural tebal 8 cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2500 120,000 30,000.00
Tukang Kayu L.02.04 OH 0.2500 135,000 33,750.00
Kepala tukang L.03.01 OH 0.0250 150,000 3,750.00
Mandor L.04.01 OH 0.0025 175,000 437.50
JUMLAH TENAGA KERJA 67,937.50
B BAHAN
Paving block 8 cm natural M2 1.01 185,000 186,850.00
Pasir beton M3 0.07 405,000 28,350.00
JUMLAH HARGA BAHAN 215,200.00
C PERALATAN -
Peralatan Kerja Paving Blok % 0.1000 215,200 21,520.00
JUMLAH HARGA ALAT 21,520.00
D Jumlah (A+B+C) - 304,657.50
E Overhead & Profit 10% 10% 30,465.75
F Harga Satuan Pekerjaan (D+E) - 335,123.00

Pemasangan 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm & 6
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.1000 120,000 12,000.00
Tukang kayu L.02.04 OH 0.1000 135,000 13,500.00
Kepala tukang L.03.01 OH 0.0100 150,000 1,500.00
Mandor L.04.01 OH 0.0050 175,000 875.00
JUMLAH TENAGA KERJA 27,875.00
B BAHAN
Tripleks Lembar 0.3750 165,000 61,875.00
Paku tripleks kg 0.0300 23,500 705.00
JUMLAH HARGA BAHAN 62,580.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 90,455.00
E Overhead & Profit 10% 10% 9,045.50
F Harga Satuan Pekerjaan (D+E) - 99,500.00

Pemasangan 1 m2 langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.1000 120,000 12,000.00
Tukang kayu L.02.04 OH 0.0500 135,000 6,750.00
Kepala tukang L.03.01 OH 0.0050 150,000 750.00
Mandor L.04.01 OH 0.0050 175,000 875.00
JUMLAH TENAGA KERJA 20,375.00
B BAHAN
Gypsum board 9 mm (1200 x 2400 mm) Lembar 0.3640 125,000 45,500.00
Paku skrup kg 0.1100 65,000 7,150.00
JUMLAH HARGA BAHAN 52,650.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 73,025.00
E Overhead & Profit 10% 10% 7,302.50
F Harga Satuan Pekerjaan (D+E) - 80,327.00
Pemasangan 1 m’ list langit-langit kayu profil
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0500 120,000 6,000.00
Tukang Kayu L.02.04 OH 0.0500 135,000 6,750.00
Kepala tukang L.03.01 OH 0.0050 150,000 750.00
Mandor L.04.01 OH 0.0030 175,000 525.00
JUMLAH TENAGA KERJA 14,025.00
B BAHAN
List kayu profil m 1.0500 55,000 57,750.00
Paku Biasa kg 0.0100 23,500 235.00
JUMLAH HARGA BAHAN 57,985.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 72,010.00
E Overhead & Profit 10% 10% 7,201.00
F Harga Satuan Pekerjaan (D+E) - 79,211.00

Pemasangan 1 m2 genteng metal ukuran 80 x 100 atap Jurai


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2000 120,000 24,000.00
Tukang Kayu L.02.04 OH 0.1000 135,000 13,500.00
Kepala tukang L.03.01 OH 0.0100 150,000 1,500.00
Mandor L.04.01 OH 0.0010 175,000 175.00
JUMLAH TENAGA KERJA 39,175.00
B BAHAN
Genteng metal Bh 2.0000 95,300 190,600.00
Paku biasa ½”-1” Kg 0.2000 35,000 7,000.00
JUMLAH HARGA BAHAN 197,600.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 236,775.00
E Overhead & Profit 10% 10% 23,677.50
F Harga Satuan Pekerjaan (D+E) - 260,452.00

Pemasangan 1 m’ nok genteng metal


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2500 120,000 30,000.00
Tukang Kayu L.02.04 OH 0.1500 135,000 20,250.00
Kepala tukang L.03.01 OH 0.0150 150,000 2,250.00
Mandor L.04.01 OH 0.0130 175,000 2,275.00
JUMLAH TENAGA KERJA 54,775.00
B BAHAN
Nok genteng metal Bh 1.1000 65,000 71,500.00
Paku Biasa Kg 0.0500 35,000 1,750.00
JUMLAH HARGA BAHAN 73,250.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 128,025.00
E Overhead & Profit 10% 10% 12,802.50
F Harga Satuan Pekerjaan (D+E) - 140,827.00

Pemasangan 1 m2 atap seng gelombang


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.1200 120,000 14,400.00
Tukang Kayu L.02.04 OH 0.0600 135,000 8,100.00
Kepala tukang L.03.01 OH 0.0060 150,000 900.00
Mandor L.04.01 OH 0.0060 175,000 1,050.00
JUMLAH TENAGA KERJA 24,450.00
B BAHAN
Seng gelombang Lbr 0.7000 125,500 87,850.00
Paku Biasa Kg 0.0200 23,500 470.00
JUMLAH HARGA BAHAN 88,320.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 112,770.00
E Overhead & Profit 10% 10% 11,277.00
F Harga Satuan Pekerjaan (D+E) - 124,047.00
Pemasangan 1 m’nok atap seng
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.1500 120,000 18,000.00
Tukang Kayu L.02.04 OH 0.0700 135,000 9,450.00
Kepala tukang L.03.01 OH 0.0070 150,000 1,050.00
Mandor L.04.01 OH 0.0060 175,000 1,050.00
JUMLAH TENAGA KERJA 29,550.00
B BAHAN
Seng plat Lbr 0.3000 76,400 22,920.00
Paku Biasa Kg 0.0400 23,500 940.00
JUMLAH HARGA BAHAN 23,860.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 53,410.00
E Overhead & Profit 10% 10% 5,341.00
F Harga Satuan Pekerjaan (D+E) - 58,751.00

HARGA SATUAN PEKERJAAN KAYU


Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas I
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 7.0000 120,000 840,000.00
Tukang kayu L.02.04 OH 21.0000 135,000 2,835,000.00
Kepala tukang L.03.01 OH 2.1000 150,000 315,000.00
Mandor L.04.01 OH 0.3500 175,000 61,250.00
JUMLAH TENAGA KERJA 4,051,250.00
B BAHAN
Balok kayu m3 1.1000 7,000,000 7,700,000.00
Paku Biasa Kg 1.2500 23,500 29,375.00
Lem Kayu/Karet Kg 1.0000 85,000 85,000.00
JUMLAH HARGA BAHAN 7,814,375.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 11,865,625.00
E Overhead & Profit 10% 10% 1,186,562.50
F Harga Satuan Pekerjaan (D+E) - 13,052,187.00

Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II atau III
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 6.0000 120,000 720,000.00
Tukang kayu L.02.04 OH 18.0000 135,000 2,430,000.00
Kepala tukang L.03.01 OH 1.8000 150,000 270,000.00
Mandor L.04.01 OH 0.3000 175,000 52,500.00
JUMLAH TENAGA KERJA 3,472,500.00
B BAHAN
Balok kayu m3 1.2000 2,550,000 3,060,000.00
Paku Biasa Kg 1.2500 23,500 29,375.00
Lem Kayu/Karet Kg 1.0000 85,000 85,000.00
JUMLAH HARGA BAHAN 3,174,375.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 6,646,875.00
E Overhead & Profit 10% 10% 664,687.50
F Harga Satuan Pekerjaan (D+E) - 7,311,562.00

Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I atau II


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.0000 120,000 120,000.00
Tukang kayu L.02.04 OH 3.0000 135,000 405,000.00
Kepala tukang L.03.01 OH 0.3000 150,000 45,000.00
Mandor L.04.01 OH 0.0500 175,000 8,750.00
JUMLAH TENAGA KERJA 578,750.00
B BAHAN
kayu Papan m3 0.0400 7,000,000 280,000.00
Lem Kayu/Karet Kg 0.5000 85,000 42,500.00
JUMLAH HARGA BAHAN 322,500.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 901,250.00
E Overhead & Profit 10% 10% 90,125.00
F Harga Satuan Pekerjaan (D+E) - 991,375.00
Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I atau II
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.8000 120,000 96,000.00
Tukang kayu L.02.04 OH 2.4000 135,000 324,000.00
Kepala tukang L.03.01 OH 0.2400 150,000 36,000.00
Mandor L.04.01 OH 0.0400 175,000 7,000.00
JUMLAH TENAGA KERJA 463,000.00
B BAHAN
kayu Papan m3 0.0240 7,000,000 168,000.00
Lem Kayu/Karet Kg 0.3000 85,000 25,500.00
JUMLAH HARGA BAHAN 193,500.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 656,500.00
E Overhead & Profit 10% 10% 65,650.00
F Harga Satuan Pekerjaan (D+E) - 722,150.00

Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi kayu kelas I atau II
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.0000 120,000 120,000.00
Tukang kayu L.02.04 OH 3.0000 135,000 405,000.00
Kepala tukang L.03.01 OH 0.3000 150,000 45,000.00
Mandor L.04.01 OH 0.0500 175,000 8,750.00
JUMLAH TENAGA KERJA 578,750.00
B BAHAN
kayu Papan m3 0.0640 7,000,000 448,000.00
Lem Kayu/Karet Kg 0.5000 85,000 42,500.00
JUMLAH HARGA BAHAN 490,500.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1,069,250.00
E Overhead & Profit 10% 10% 106,925.00
F Harga Satuan Pekerjaan (D+E) - 1,176,175.00

Pemasangan 1 m2 jalusi kusen, kayu kelas I atau II


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.67 120,000 80,400.00
Tukang kayu L.02.04 OH 2.000 135,000 270,000.00
Kepala tukang L.03.01 OH 0.2 150,000 30,000.00
Mandor L.04.01 OH 0.335 175,000 58,625.00
JUMLAH TENAGA KERJA 439,025.00
B BAHAN
Kayu Papan m3 0.06 7,000,000 420,000.00
Paku Biasa kg 0.15 23,500 3,525.00
JUMLAH HARGA BAHAN 423,525.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 862,550.00
E Overhead & Profit 10% 10% 86,255.00
F Harga Satuan Pekerjaan (D+E) - 948,805.00

Pemasangan 1 m3 konstruksi kuda-kuda expose, kayu kelas II


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 6.700 120,000 804,000.00
Tukang kayu L.02.04 OH 20.100 135,000 2,713,500.00
Kepala tukang L.03.01 OH 2.010 150,000 301,500.00
Mandor L.04.01 OH 0.335 175,000 58,625.00
JUMLAH TENAGA KERJA 3,877,625.00
B BAHAN
Balok kayu m3 1.200 2,550,000 3,060,000.00
Besi strip kg 15.000 55,000 825,000.00
Paku Biasa kg 5.600 23,500 131,600.00
JUMLAH HARGA BAHAN 4,016,600.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 7,894,225.00
E Overhead & Profit 10% 10% 789,422.50
F Harga Satuan Pekerjaan (D+E) - 8,683,647.00
Pemasangan 1 m3 konstruksi gordeng, kayu kelas II
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 6.700 120,000 804,000.00
Tukang kayu L.02.04 OH 20.100 135,000 2,713,500.00
Kepala tukang L.03.01 OH 2.010 150,000 301,500.00
Mandor L.04.01 OH 0,335 175,000 58,625
JUMLAH TENAGA KERJA 3,877,625.00
B BAHAN
Balok kayu m3 1.100 2,550,000 2,805,000.00
Besi strip kg 15.000 55,000 825,000.00
Paku Biasa kg 3.000 23,500 70,500.00
JUMLAH HARGA BAHAN 3,700,500.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 7,578,125.00
E Overhead & Profit 10% 10% 757,812.50
F Harga Satuan Pekerjaan (D+E) - 8,335,937.00

Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II atau III
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2 120,000 24,000.00
Tukang kayu L.02.04 OH 0.3 135,000 40,500.00
Kepala tukang L.03.01 OH 0.03 150,000 4,500.00
Mandor L.04.01 OH 0.01 175,000 1,750.00
JUMLAH TENAGA KERJA 70,750.00
B BAHAN
Kayu 5/7 m3 0.0163 2,550,000 41,565.00
Paku Biasa kg 0.25 23,500 5,875.00
JUMLAH HARGA BAHAN 47,440.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 118,190.00
E Overhead & Profit 10% 10% 11,819.00
F Harga Satuan Pekerjaan (D+E) - 130,009.00

Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.10000 120,000 12,000.00
Tukang kayu L.02.04 OH 0.20000 135,000 27,000.00
Kepala tukang L.03.01 OH 0.02000 150,000 3,000.00
Mandor L.04.01 OH 0.00500 175,000 875.00
JUMLAH TENAGA KERJA 42,875.00
B BAHAN
Kayu Papan m3 0.0108 7,000,000 75,600.00
Paku Biasa kg 0.1000 23,500 2,350.00
JUMLAH HARGA BAHAN 77,950.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 120,825.00
E Overhead & Profit 10% 10% 12,082.50
F Harga Satuan Pekerjaan (D+E) - 132,907.00

Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.1 120,000 12,000.00
Tukang kayu L.02.04 OH 0.2 135,000 27,000.00
Kepala tukang L.03.01 OH 0.02 150,000 3,000.00
Mandor L.04.01 OH 0.005 175,000 875.00
JUMLAH TENAGA KERJA 42,875.00
B BAHAN
Kayu Papan m3 0.011 7,000,000 77,000.00
Paku Biasa kg 0.05 23,500 1,175.00
JUMLAH HARGA BAHAN 78,175.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 121,050.00
E Overhead & Profit 10% 10% 12,105.00
F Harga Satuan Pekerjaan (D+E) - 133,155.00
HARGA SATUAN PEKERJAAN KUNCI DAN KACA
Pemasangan 1 buah kunci tanam antik
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.060 120,000 7,200.00
Tukang kayu L.02.04 OH 0.600 135,000 81,000.00
Kepala tukang L.03.01 OH 0.060 150,000 9,000.00
Mandor L.04.01 OH 0.003 175,000 525.00
JUMLAH TENAGA KERJA 97,725.00
B BAHAN
Kunci tanam antik Bh 1.000 350,000 350,000.00
JUMLAH HARGA BAHAN 350,000.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 447,725.00
E Overhead & Profit 10% 10% 44,772.50
F Harga Satuan Pekerjaan (D+E) - 492,497.00

Pemasangan 1 buah kunci kamar mandi


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.005 120,000 600.00
Tukang kayu L.02.04 OH 0.500 135,000 67,500.00
Kepala tukang L.03.01 OH 0.050 150,000 7,500.00
Mandor L.04.01 OH 0.003 175,000 525.00
JUMLAH TENAGA KERJA 76,125.00
B BAHAN
Kunci tanam KM Bh 1.000 150,000 150,000.00
JUMLAH HARGA BAHAN 150,000.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 226,125.00
E Overhead & Profit 10% 10% 22,612.50
F Harga Satuan Pekerjaan (D+E) - 248,737.00

Pemasangan 1 buah engsel pintu


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.015 120,000 1,800.00
Tukang kayu L.02.04 OH 0.150 135,000 20,250.00
Kepala tukang L.03.01 OH 0.015 150,000 2,250.00
Mandor L.04.01 OH 0.001 175,000 140.00
JUMLAH TENAGA KERJA 24,440.00
B BAHAN
Engsel pintu Bh 1.000 40,500 40,500.00
JUMLAH HARGA BAHAN 40,500.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 64,940.00
E Overhead & Profit 10% 10% 6,494.00
F Harga Satuan Pekerjaan (D+E) - 71,434.00

Pemasangan 1 buah engsel jendela kupu-kupu


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.010 120,000 1,200.00
Tukang kayu L.02.04 OH 0.100 135,000 13,500.00
Kepala tukang L.03.01 OH 0.010 150,000 1,500.00
Mandor L.04.01 OH 0.001 175,000 87.50
JUMLAH TENAGA KERJA 16,287.50
B BAHAN
Engsel kupu-kupu Bh 1.000 32,500 32,500.00
JUMLAH HARGA BAHAN 32,500.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 48,787.50
E Overhead & Profit 10% 10% 4,878.75
F Harga Satuan Pekerjaan (D+E) - 53,666.00
Pemasangan 1 buah Grendel Pintu
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.100 120,000 12,000.00
Tukang kayu L.02.04 OH 0.200 135,000 27,000.00
Kepala tukang L.03.01 OH 0.020 150,000 3,000.00
Mandor L.04.01 OH 0.001 175,000 87.50
JUMLAH TENAGA KERJA 42,087.50
B BAHAN
Grendel Bh 1.000 32,500 32,500.00
JUMLAH HARGA BAHAN 32,500.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 74,587.50
E Overhead & Profit 10% 10% 7,458.75
F Harga Satuan Pekerjaan (D+E) - 82,046.00

Pemasangan 1 buah Grendel Jendela


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.100 120,000 12,000.00
Tukang kayu L.02.04 OH 0.200 135,000 27,000.00
Kepala tukang L.03.01 OH 0.020 150,000 3,000.00
Mandor L.04.01 OH 0.001 175,000 87.50
JUMLAH TENAGA KERJA 42,087.50
B BAHAN
Grendel Bh 1.000 27,500 27,500.00
JUMLAH HARGA BAHAN 27,500.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 69,587.50
E Overhead & Profit 10% 10% 6,958.75
F Harga Satuan Pekerjaan (D+E) - 76,546.00

Pemasangan 1 buah kait angin


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.015 120,000 1,800.00
Tukang kayu L.02.04 OH 0.150 135,000 20,250.00
Kepala tukang L.03.01 OH 0.015 150,000 2,250.00
Mandor L.04.01 OH 0.008 175,000 1,400.00
JUMLAH TENAGA KERJA 25,700.00
B BAHAN
Kait angin Bh 1.000 25,000 25,000.00
JUMLAH HARGA BAHAN 25,000.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 50,700.00
E Overhead & Profit 10% 10% 5,070.00
F Harga Satuan Pekerjaan (D+E) - 55,770.00

Pemasangan 1 m2 kaca tebal 3 mm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.015 120,000 1,800.00
Tukang kayu L.02.04 OH 0.150 135,000 20,250.00
Kepala tukang L.03.01 OH 0.015 150,000 2,250.00
Mandor L.04.01 OH 0.001 175,000 140.00
JUMLAH TENAGA KERJA 24,440.00
B BAHAN
Kaca tebal 3mm m2 1.100 165,000 181,500.00
SEalant Kg 0.050 -
JUMLAH HARGA BAHAN 181,500.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 205,940.00
E Overhead & Profit 10% 10% 20,594.00
F Harga Satuan Pekerjaan (D+E) - 226,534.00
Pemasangan 1 m2 kaca tebal 5 mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.015 120,000 1,800.00
Tukang kayu L.02.04 OH 0.150 135,000 20,250.00
Kepala tukang L.03.01 OH 0.015 150,000 2,250.00
Mandor L.04.01 OH 0.001 175,000 140.00
JUMLAH TENAGA KERJA 24,440.00
B BAHAN
Kaca tebal 5 mm m2 1.100 246,000 270,600.00
SEalant Kg 0.050 75,000 3,750.00
JUMLAH HARGA BAHAN 274,350.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 298,790.00
E Overhead & Profit 10% 10% 29,879.00
F Harga Satuan Pekerjaan (D+E) - 328,669.00

HARGA SATUAN PEKERJAAN PENGECATAN

1 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.070 120,000 8,400.00
Tukang cat L.02.08 OH 0.009 135,000 1,215.00
Kepala tukang L.03.01 OH 0.006 150,000 900.00
Mandor L.04.01 OH 0.003 175,000 525.00
JUMLAH TENAGA KERJA 11,040.00
B BAHAN
Cat menie Kg 0.200 35,000 7,000.00
Plamuur Kg 0.150 50,000 7,500.00
Cat dasar Kayu Kg 0.170 60,000 10,200.00
Cat Penutup Kayu Kg 0.260 80,000 20,800.00
Kuas Bh 0.010 25,000 250.00
Pengencer Kg 0.030 45,000 1,350.00
Ampelas Lbr 0.200 10,000 2,000.00
JUMLAH HARGA BAHAN 49,100.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 60,140.00
E Overhead & Profit 10% 10% 6,014.00
F Harga Satuan Pekerjaan (D+E) - 66,154.00

Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.020 120,000 2,400.00
Tukang cat L.02.08 OH 0.063 135,000 8,505.00
Kepala tukang L.03.01 OH 0.006 150,000 945.00
Mandor L.04.01 OH 0.003 175,000 525.00
JUMLAH TENAGA KERJA 12,375.00
B BAHAN
Plamuur Kg 0.100 50,000 5,000.00
Cat dasar Tembok Kg 0.100 45,000 4,500.00
Cat Penutup Tembok Kg 0.260 115,000 29,900.00
JUMLAH HARGA BAHAN 39,400.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 51,775.00
E Overhead & Profit 10% 10% 5,177.50
F Harga Satuan Pekerjaan (D+E) - 56,952.00
Pengecatan 1 m2 tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.028 120,000 3,360.00
Tukang cat L.02.08 OH 0.042 135,000 5,670.00
Kepala tukang L.03.01 OH 0.004 150,000 630.00
Mandor L.04.01 OH 0.003 175,000 525.00
JUMLAH TENAGA KERJA 10,185.00
B BAHAN
Cat dasar Tembok Kg 0.1200 45,000 5,400.00
Cat Penutup Tembok Kg 0.1800 45,000 8,100.00
JUMLAH HARGA BAHAN 13,500.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 23,685.00
E Overhead & Profit 10% 10% 2,368.50
F Harga Satuan Pekerjaan (D+E) - 26,053.00

HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG


(K3) Pemasangan 1 buah closet duduk/monoblock
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 3.300 120,000 396,000.00
Tukang batu L.02.03 OH 1.100 135,000 148,500.00
Kepala tukang L.03.01 OH 0.010 150,000 1,500.00
Mandor L.04.01 OH 0.160 175,000 28,000.00
JUMLAH TENAGA KERJA 574,000.00
B BAHAN
Closet duduk Unit 1.000 2,750,000 2,750,000.00
Perlengkapan % 0.060 2,750,000 165,000.00
JUMLAH HARGA BAHAN 5,500,000 2,915,000.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 3,489,000.00
E Overhead & Profit 10% 10% 348,900.00
F Harga Satuan Pekerjaan (D+E) - 3,837,900.00

Pemasangan 1 buah closet jongkok porslen


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.000 120,000 120,000.00
Tukang batu L.02.03 OH 1.500 135,000 202,500.00
Kepala tukang L.03.01 OH 0.150 150,000 22,500.00
Mandor L.04.01 OH 0.160 175,000 28,000.00
JUMLAH TENAGA KERJA 373,000.00
B BAHAN
Closet jongkok Unit 1.000 430,000 430,000.00
Semen portland Kg 6.000 1,700 10,200.00
Pasir pasang M3 0.010 405,000 4,050.00
JUMLAH HARGA BAHAN 444,250.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 817,250.00
E Overhead & Profit 10% 10% 81,725.00
F Harga Satuan Pekerjaan (D+E) - 898,975.00

(K3) Pemasangan 1 buah urinoir


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.000 120,000 120,000.00
Tukang batu L.02.03 OH 1.000 135,000 135,000.00
Kepala tukang L.03.01 OH 0.100 150,000 15,000.00
Mandor L.04.01 OH 0.050 175,000 8,750.00
JUMLAH TENAGA KERJA 278,750.00
B BAHAN
Urinoir Unit 1.000 1,500,000 1,500,000.00
Semen portland Kg 6.000 1,700 10,200.00
Pasir pasang M3 0.010 405,000 4,050.00
Perlengkapan % 30.000 15,143 454,275.00
JUMLAH HARGA BAHAN 1,968,525.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 2,247,275.00
E Overhead & Profit 10% 10% 224,727.50
F Harga Satuan Pekerjaan (D+E) - 2,472,002.00
(K3) Pemasangan 1 buah wastafel
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.200 120,000 144,000.00
Tukang batu L.02.03 OH 1.450 135,000 195,750.00
Kepala tukang L.03.01 OH 0.150 150,000 22,500.00
Mandor L.04.01 OH 0.060 175,000 10,500.00
JUMLAH TENAGA KERJA 372,750.00
B BAHAN
Wastafel Unit 1.200 1,150,000 1,380,000.00
Semen portland Kg 6.000 1,700 10,200.00
Pasir pasang M3 0.010 405,000 4,050.00
Perlengkapan % 12.000 13,943 167,310.00
JUMLAH HARGA BAHAN 1,561,560.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1,934,310.00
E Overhead & Profit 10% 10% 193,431.00
F Harga Satuan Pekerjaan (D+E) - 2,127,741.00

Pemasangan 1 buah floor drain


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.010 120,000 1,200.00
Tukang batu L.02.03 OH 0.100 135,000 13,500.00
Kepala tukang L.03.01 OH 0.010 150,000 1,500.00
Mandor L.04.01 OH 0.005 175,000 875.00
JUMLAH TENAGA KERJA 17,075.00
B BAHAN
Floor drain Unit 1.000 235,000 235,000.00
JUMLAH HARGA BAHAN 235,000.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 252,075.00
E Overhead & Profit 10% 10% 25,207.50
F Harga Satuan Pekerjaan (D+E) - 277,282.00

Pemasangan 1 m’ pipa galvanis diameter ½”


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.054 120,000 6,480.00
Tukang batu L.02.03 OH 0.090 135,000 12,150.00
Kepala tukang L.03.01 OH 0.009 150,000 1,350.00
Mandor L.04.01 OH 0.027 175,000 4,725.00
JUMLAH TENAGA KERJA 24,705.00
B BAHAN
Pipa galvanis ½” M 1.200 45,000 54,000.00
Perlengkapan % 35.000 540 18,900.00
JUMLAH HARGA BAHAN 72,900.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 97,605.00
E Overhead & Profit 10% 10% 9,760.50
F Harga Satuan Pekerjaan (D+E) - 107,365.00

Pemasangan 1 buah kran diameter ½” atau 3/4”


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.010 120,000 1,200.00
Tukang batu L.02.03 OH 0.400 135,000 54,000.00
Kepala tukang L.03.01 OH 0.040 150,000 6,000.00
Mandor L.04.01 OH 0.005 175,000 875.00
JUMLAH TENAGA KERJA 62,075.00
B BAHAN
Kran air M 1.000 11,250 11,250.00
Sealtape Buah 0.025 7,500 187.50
JUMLAH HARGA BAHAN 11,437.50
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 73,512.50
E Overhead & Profit 10% 10% 7,351.25
F Harga Satuan Pekerjaan (D+E) - 80,863.00
Pemasangan 1 m’ pipa galvanis diameter 3/4”
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.054 120,000 6,480.00
Tukang batu L.02.03 OH 0.090 135,000 12,150.00
Kepala tukang L.03.01 OH 0.009 150,000 1,350.00
Mandor L.04.01 OH 0.027 175,000 4,725.00
JUMLAH TENAGA KERJA 24,705.00
B BAHAN
Pipa galvanis 3/4” M 1.200 16,250 19,500.00
Perlengkapan % 35.000 195 6,825.00
JUMLAH HARGA BAHAN 26,325.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 51,030.00
E Overhead & Profit 10% 10% 5,103.00
F Harga Satuan Pekerjaan (D+E) - 56,133.00

Pemasangan 1 m’ pipa galvanis diameter 1”


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.054 120,000 6,480.00
Tukang batu L.02.03 OH 0.090 135,000 12,150.00
Kepala tukang L.03.01 OH 0.009 150,000 1,350.00
Mandor L.04.01 OH 0.027 175,000 4,725.00
JUMLAH TENAGA KERJA 24,705.00
B BAHAN
Pipa galvanis 1” M 1.200 350,000 420,000.00
Perlengkapan % 35.000 4,200 147,000.00
JUMLAH HARGA BAHAN 567,000.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 591,705.00
E Overhead & Profit 10% 10% 59,170.50
F Harga Satuan Pekerjaan (D+E) - 650,875.00

Pemasangan 1 m’ pipa galvanis diameter 1 ½”


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.108 120,000 12,960.00
Tukang batu L.02.03 OH 0.180 135,000 24,300.00
Kepala tukang L.03.01 OH 0.018 150,000 2,700.00
Mandor L.04.01 OH 0.005 175,000 875.00
JUMLAH TENAGA KERJA 40,835.00
B BAHAN
Pipa galvanis 11/2” M 1.200 251,000 301,200.00
Perlengkapan % 35.000 3,012 105,420.00
JUMLAH HARGA BAHAN 406,620.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 447,455.00
E Overhead & Profit 10% 10% 44,745.50
F Harga Satuan Pekerjaan (D+E) - 492,200.00

Pemasangan 1 m’ pipa galvanis diameter 3”


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.135 120,000 16,200.00
Tukang batu L.02.03 OH 0.225 135,000 30,375.00
Kepala tukang L.03.01 OH 0.023 150,000 3,450.00
Mandor L.04.01 OH 0.007 175,000 1,225.00
JUMLAH TENAGA KERJA 51,250.00
B BAHAN
Pipa galvanis 3” M 1.200 1,136,000 1,363,200.00
Perlengkapan % 35.000 13,632 477,120.00
JUMLAH HARGA BAHAN 1,840,320.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1,891,570.00
E Overhead & Profit 10% 10% 189,157.00
F Harga Satuan Pekerjaan (D+E) - 2,080,727.00
Pemasangan 1 m’ pipa PVC tipe AW diameter 1/2”
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.036 120,000 4,320.00
Tukang batu L.02.03 OH 0.060 135,000 8,100.00
Kepala tukang L.03.01 OH 0.006 150,000 900.00
Mandor L.04.01 OH 0.002 175,000 350.00
JUMLAH TENAGA KERJA 13,670.00
B BAHAN
Pipa PVC 1/2” M 1.200 11,250 13,500.00
Perlengkapan % 35.000 135 4,725.00
JUMLAH HARGA BAHAN 18,225.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 31,895.00
E Overhead & Profit 10% 10% 3,189.50
F Harga Satuan Pekerjaan (D+E) - 35,084.00

Pemasangan 1 m’ pipa PVC tipe AW diameter 3/4”


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.036 120,000 4,320.00
Tukang batu L.02.03 OH 0.060 135,000 8,100.00
Kepala tukang L.03.01 OH 0.006 150,000 900.00
Mandor L.04.01 OH 0.002 175,000 350.00
JUMLAH TENAGA KERJA 13,670.00
B BAHAN
Pipa PVC 3/4” M 1.200 16,250 19,500.00
Perlengkapan % 35.000 195 6,825.00
JUMLAH HARGA BAHAN 26,325.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 39,995.00
E Overhead & Profit 10% 10% 3,999.50
F Harga Satuan Pekerjaan (D+E) - 43,994.00

Pemasangan 1 m’ pipa PVC tipe AW diameter 1”


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.036 120,000 4,320.00
Tukang batu L.02.03 OH 0.060 135,000 8,100.00
Kepala tukang L.03.01 OH 0.006 150,000 900.00
Mandor L.04.01 OH 0.002 175,000 350.00
JUMLAH TENAGA KERJA 13,670.00
B BAHAN
Pipa PVC 1” M 1.200 23,750 28,500.00
Perlengkapan % 35.000 285 9,975.00
JUMLAH HARGA BAHAN 38,475.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 52,145.00
E Overhead & Profit 10% 10% 5,214.50
F Harga Satuan Pekerjaan (D+E) - 57,359.00

Pemasangan 1 m’ pipa PVC tipe AW diameter 3”


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.081 120,000 9,720.00
Tukang batu L.02.03 OH 0.135 135,000 18,225.00
Kepala tukang L.03.01 OH 0.014 150,000 2,025.00
Mandor L.04.01 OH 0.004 175,000 700.00
JUMLAH TENAGA KERJA 30,670.00
B BAHAN
Pipa PVC 3” M 1.200 71,250 85,500.00
Perlengkapan % 35.000 855 29,925.00
JUMLAH HARGA BAHAN 115,425.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 146,095.00
E Overhead & Profit 10% 10% 14,609.50
F Harga Satuan Pekerjaan (D+E) - 160,704.00
Pemasangan 1 m’ pipa PVC tipe AW diameter 4”
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.081 120,000 9,720.00
Tukang batu L.02.03 OH 0.135 135,000 18,225.00
Kepala tukang L.03.01 OH 0.014 150,000 2,025.00
Mandor L.04.01 OH 0.004 175,000 700.00
JUMLAH TENAGA KERJA 30,670.00
B BAHAN
Pipa PVC 4” M 1.200 93,750 112,500.00
Perlengkapan % 35.000 1,125 39,375.00
JUMLAH HARGA BAHAN 151,875.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 182,545.00
E Overhead & Profit 10% 10% 18,254.50
F Harga Satuan Pekerjaan (D+E) - 200,799.00

HARGA SATUAN PEKERJAAN ELEKTRIKAL


(K3) Pemasangan 1 buah titik lampu
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Upah % 1.0000 120,000 120,000.00
JUMLAH TENAGA KERJA 120,000.00
B BAHAN
Pipa listrik 5/8” btg 0.2830 14,500 4,103.50
Kabel NYM 3x2,5 mm2 m 24.0000 18,500 444,000.00
Tee Doos bh 3.0000 7,500 22,500.00
L.Bow bh 4.0000 10,000 40,000.00
Las Dop bh 3.0000 17,500 52,500.00
Klem Pipa Listrik bh 24.0000 12,000 288,000.00
Mongkok (Listrik) bh 1.0000 5,000 5,000.00
Saklar (standar) bh 1.0000 85,300 85,300.00
Fitting Lampu bh 1.0000 10,000 10,000.00
JUMLAH HARGA BAHAN 951,403.50
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1,071,403.50
E Overhead & Profit 10% 10% 107,140.35
F Harga Satuan Pekerjaan (D+E) - 1,178,543.00

Memasang 1 Titik Instalasi Penerangan


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja % 1 120,000 120,000.00
JUMLAH TENAGA KERJA 120,000.00
B BAHAN
Pipa Listrik 5/8" Btg 3.00 14,500 43,500.00
Kabel M' 24.00 18,500 444,000.00
T dos bh 3.00 7,500 22,500.00
L Bow bh 4.00 10,000 40,000.00
Klem bh 24.00 12,000 288,000.00
Mongkok bh 1.00 5,000 5,000.00
Saklar bh 1.00 17,500 17,500.00
Fitting bh 1.00 1,000 1,000.00
JUMLAH HARGA BAHAN 861,500.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 981,500.00
E Overhead & Profit 10% 10% 98,150.00
F Harga Satuan Pekerjaan (D+E) - 1,079,650.00
DAFTAR HARGA UPAH DAN BAHAN

HARGA SATUAN
No. BAHAN / TENAGA SAT

HARGA UPAH
1 Tukang batu,kayu,cat,besi,Tukang Aluminium Rp. 135,000.00 / hari
2 Kepala Tukang Rp. 150,000.00 / hari
3 Mandor Rp. 175,000.00 / hari
4 Pekerja Rp. 120,000.00 / hari

HARGA BAHAN
2 Batu Bata Merah Rp. 1,500.00 Bh
3 Batu Kali Rp. 415,000.00 M3
3 Batu Belah Rp. 415,000.00 M3
4 Batu karang/Gunung Rp. 415,000.00 M3
5 Batu Pecah 1/2 CM Rp. 600,000.00 M3
6 Batu Pecah 2/3 CM Rp. 500,000.00 M3
7 Batu Pecah 5/7 dan 3/5 CM Rp. 450,000.00 M3
8 Kayu Kls I Rp. 7,000,000.00 M3
9 Kayu Kls II Rp. 2,550,000.00 M3
10 KERIKIL Rp. 410,000.00 M3
11 KERIKIL SARING Rp. 430,000.00 M3
12 PASIR PASANGAN Rp. 405,000.00 M3
13 PASIR BETON (KASAR) Rp. 405,000.00 M3
14 PASIR TIMBUNAN Rp. 235,000.00 M3
15 SIRTU Rp. 235,000.00 M3
16 BATU ALAM Rp. 325,000.00 M2
17 TANAH TIMBUNAN Rp. 235,000.00 M3

BAHAN NON LOKAL


2 BAJA KONSTRUKSI Rp. 28,500.00 Kg
3 BAJA TULANGAN Rp. 15,000.00 Kg
4 BAUT MUR DIAMETER 12 - 30 MM Rp. 7,250.00 Bh
11 CAT MENY SETARA KEMBANG Rp. 29,500.00 Kg
12 CAT MINYAK SETARA GLOTEKS Rp. 60,000.00 Kg
13 CAT ANTI LUMUT (EX MOWILEX) Rp. 75,000.00 Kg
15 CERMIN Rp. 250,000.00 LEMBAR
16 DOOP AIR Rp. 29,500.00 BUAH
17 DEMPUL KAYU SETARA KEMBANG Rp. 25,000.00 Kg
18 ENGSEL JENDELA SETARA ALOHA Rp. 33,600.00 SET
19 ENGSEL JENDELA SETARA HINGS Rp. 32,500.00 SET
20 ENGSEL PINTU SETARA ALOHA Rp. 40,500.00 SET
21 ENGSEL PINTU SETARA HINGS Rp. 40,500.00 SET
22 FLOOR DRAIN Rp. 235,000.00 BUAH
23 GENTENG ASBES Rp. 65,000.00 M2
24 GENTENG METAL RAINBOW Rp. 95,300.00 M2
25 GENTENG EX SAKURA ROOF Rp. 95,300.00 M2
26 BUBUNGAN EX SAKURA ROOF Rp. 95,300.00 M2
27 GRENDEL PINTU Rp. 32,500.00 BUAH
28 GRENDEL JENDELA Rp. 27,500.00 BUAH
35 KERAMIK 40 X 40 Rp. 130,000.00 DOS
36 KERAMIK 60 X 60 Rp. 332,000.00 DOS
37 KERAMIK DINDING POLOS Rp. 120,000.00 DOS
39 KACA POLOS 3 MM (122 X 152 ) Rp. 165,000.00 LEMBAR
40 KACA POLOS 5 MM (122 X 152 ) Rp. 246,000.00 LEMBAR
41 KACA RYBEN 3 MM (122 X 152 ) Rp. 160,000.00 LEMBAR
42 KACA RYBEN 5 MM (122 X 152 ) Rp. 240,000.00 LEMBAR
43 KAIT ANGIN BIASA Rp. 19,500.00 BUAH
44 KAIT ANGIN SETARA KZK Rp. 25,000.00 BUAH
45 KAPUR API Rp. 12,500.00 Kg
46 KAWAT ANGIN Rp. 25,000.00 M2
47 KAWAT BAJA Rp. 27,500.00 Kg
48 KRAN AIR STAINLESS STEEL Rp. 73,500.00 BUAH
48 KRAN AIR KUNINGAN Rp. 45,000.00 BUAH
49 KERTAS GOSOK Rp. 5,000.00 LEMBAR
50 KLOSET DUDUK/INA Rp. 2,750,000.00 BUAH
51 KLOSET JONGKOK SETARA INA Rp. 430,000.00 BUAH
52 KLOSET JONGKOK SETARA TORINO Rp. 420,000.00 BUAH
53 KUNCI SETARA KUDA TERBANG Rp. 110,000.00 SET
54 KUNCI PUTAR SES Rp. 135,000.00 SET
55 KUNCI SETARA SES Rp. 185,000.00 SET
56 LAMPU PIJAR 100 WATT Rp. 350,000.00 BUAH
57 LAMPU PIJAR 25 WATT Rp. 125,000.00 BUAH
58 LAMPU PIJAR 40 WATT Rp. 175,000.00 BUAH
59 LAMPU PIJAR 60 WATT Rp. 250,000.00 BUAH
60 LAMPU TL 10 WATT Rp. 175,000.00 BUAH
61 LAMPU TL 20 WATT Rp. 245,000.00 BUAH
62 LAMPU TL 40 WATT Rp. 385,000.00 BUAH
63 PAKU CAMPUR Rp. 23,500.00 Kg
64 PAKU JEMBATAN Rp. 23,500.00 Kg
65 PAKU SENG Rp. 23,500.00 Kg
66 PAKU TRIPLEKS Rp. 23,500.00 Kg
67 POLITUR Rp. 65,000.00 LITER
68 PLAMIR Rp. 27,500.00 Kg
69 PAVING BLOK Rp. 185,000.00 M2
70 SAKLAR GANDA TANAM Rp. 85,300.00 BUAH
71 SAKLAR GANDA TEMPEL Rp. 83,200.00 BUAH
72 SAKLAR TUNGGAL TANAM Rp. 73,200.00 BUAH
73 SAKLAR TUNGGAL TEMPEL Rp. 68,500.00 BUAH
74 SEMEN Rp. 85,000.00 ZAK
75 SEMEN PUTIH Rp. 150,000.00 ZAK
76 SENG GELOMBANG BJLS 0,20 Rp. 105,300.00 LEMBAR
77 SENG GELOMBANG BJLS 0,25 Rp. 125,500.00 LEMBAR
78 SENG PLAT BJLS 0,20 Rp. 68,500.00 LEMBAR
79 SENG PLAT BJLS 0,25 Rp. 76,400.00 LEMBAR
80 STOP KONTAK GANDA TANAM Rp. 95,000.00 BUAH
81 STOP KONTAK TUNGGAL TANAM Rp. 85,000.00 BUAH
82 STOP KONTAK GANDA TEMPEL Rp. 87,500.00 BUAH
83 STOP KONTAK TUNGGAL TEMPEL Rp. 78,900.00 BUAH
84 TEAKWOOD Rp. 155,000.00 LEMBAR
85 TEGEL SETARA AKURA WARNA ( 30 X 30 ) Rp. 115,000.00 M2
86 TEGEL SETARA AKURA ( 30 X 30 ) Rp. 120,000.00 M2
87 TEGEL SETARA MASTERINA (10 X 20 ) Rp. 110,000.00 M2
88 TEGEL SETARA MASTERINA (20 X 20 ) Rp. 112,000.00 M2
89 THINER A Rp. 45,000.00 LITER
90 THINER SUPER Rp. 52,000.00 LITER
91 TRIPLEKS 3 MM Rp. 125,000.00 LEMBAR
92 TRIPLEKS 5 MM Rp. 165,000.00 LEMBAR
93 TANDON AIR 1100 LITER Rp. 2,250,000.00 BUAH
94 TANDON AIR 2200 LITER Rp. 4,500,000.00 BUAH
95 VITING GANTUNG Rp. 10,000.00 BUAH
96 VITING TEMPEL Rp. 1,000.00 BUAH
97 WASTAVEL Rp. 1,350,000.00 SET
98 KAWAT LAS Rp. 75,000.00 SET
99 PIPA GIP MEDIUM 'A' DIAMETER 1/2" Rp. 175,000.00 STAF
100 PIPA GIP MEDIUM 'A' DIAMETER 3/4 " Rp. 225,000.00 STAF
101 PIPA GIP MEDIUM 'A'METER 1" Rp. 350,000.00 STAF
115 PIPA PVC AW DIAMETER 1/2" Rp. 45,000.00 STAF
116 PIPA PVC AW DIAMETER 3/4 " Rp. 65,000.00 STAF
117 PIPA PVC AW DIAMETER 1" Rp. 95,000.00 STAF
118 PIPA PVC AW DIAMETER 1 1/2" Rp. 125,000.00 STAF
119 PIPA PVC AW DIAMETER 2" Rp. 175,000.00 STAF
120 PIPA PVC AW DIAMETER 3" Rp. 285,000.00 STAF
121 PIPA PVC AW DIAMETER 4" Rp. 375,000.00 STAF
167 BESI HOLLOW 4 X 4 Rp. 225,000.00 STAF
168 BESI HOLLOW 4 X 6 Rp. 245,000.00 STAF
169 BESI HOLLOW 2 X 4 Rp. 175,000.00 STAF
170 ALUMANIUM KUSEN Rp. 350,000.00 BATANG
171 MINYAK TANAH Rp. 10,000.00 LITER
172 SOLAR Rp. 12,000.00 LITER
173 BENSIN/PREMIUM Rp. 12,000.00 LITER
177 AIR KERJA Rp. 250.00 LITER
178 PLINT KERAMIK 10 X 10 Rp. 35,000.00 M1
179 LIST PLAFON PROFIL KAYU Rp. 55,000.00 M1
180 LEM KAYU Rp. 85,000.00 kg
181 BESSI STRIP Rp. 55,000.00 kg
182 KUNCI TANAM 2 SLAAG Rp. 350,000.00 BH
183 KUNCI TANAM KAMAR MANDI Rp. 150,000.00 BH
184 CAT MANIE Rp. 35,000.00 KG
185 PLAMUUR Rp. 50,000.00 KG
186 CAT DASAR JAYU Rp. 60,000.00 KG
187 CAT PENUTUP KAYU Rp. 80,000.00 KG
188 KUAS Rp. 25,000.00 bh
189 PENGENCER Rp. 45,000.00 KG
190 AMPLAS Rp. 10,000.00 KG
191 CAT DASAR TEMBOK Rp. 45,000.00 KG
192 CAT PENUTUP TEMBOK Rp. 115,000.00 KG
193 URINOIR LOKAL PUTIH Rp. 1,500,000.00 UNIT
194 WASTAVEL Rp. 1,150,000.00 UNIT
195 FLOOR DRAIN BESSI Rp. 235,000.00 BH
196 GYPSUM BORD Rp. 125,000.00 LBR
197 SEKRUP GYPSUM BORD Rp. 65,000.00 DOS
198 SEAL TAPE Rp. 7,500.00 BH
199 KABEL NYM 3 X 2.5 Rp. 18,500.00 BH
200 PIPA LISTRIK Rp. 14,500.00 BH
201 SOCKET PIPA Rp. 12,500.00 BH
202 T DOS Rp. 7,500.00 BH
203 KLEM PIPA Rp. 20,000.00 BH
204 LAS DOP Rp. 17,500.00 BH
205 MCB 35 AMPER Rp. 350,000.00 BH
206 L BOW Rp. 10,000.00 BH
207 MONGKOK LISTRIK Rp. 5,000.00 BH
208 GENTENG METAL Rp. 95,300.00 BH
209 BUMBUNGAN GENTENG Rp. 65,000.00 BH
210 BAJA CANAL 75/100 Rp. 125,000.00 M
211 PAKU GENTENG Rp. 35,000.00 BH
212 SEKRUP RENG Rp. 3,500.00 BH
213 RENG Rp. 57,500.00 BH
214 DINABOLT Rp. 4,500.00 BH
215 TALANG JURAI DALAM Rp. 25,000.00 BH
ALUR PERHITUNGAN HARGA SATUAN

Harga Ongkos Ongkos Berat Jenis Galian C Harga Over Head Jumlah PEMBULATAN
URAIAN SAT Dasar Angkut Naik/turun 20% x (4) x BJ Lokasi 10% (7+8+9) (Rp)
Quary (4+5+6) (4)+(5)x15%
2 3 4 5 6 7 8 9 10 13

LOKAL
ABU BATU M3 205,200.00 - - 1.67 - - -
BATU BATA MERAH BUAH 1,700.00 3,000.00 1.70 - 4,700.00 4,700.00 5,000.00
BATU KALI M3 351,900.00 27,000.00 1.40 70,380.00 378,900.00 449,280.00 449,000.00
BATU BELAH M3 351,900.00 27,000.00 1.50 70,380.00 378,900.00 449,280.00 449,000.00
BATU KARANG / GUNUNG M3 351,900.00 27,000.00 1.67 70,380.00 378,900.00 449,280.00 449,000.00
BATU PECAH 1/2 CM M3 410,500.00 27,000.00 1.45 82,100.00 437,500.00 519,600.00 520,000.00
BATU PECAH 2/3 CM M3 410,500.00 27,000.00 1.45 82,100.00 437,500.00 519,600.00 520,000.00
BATU PECAH 5/7 DAN 3/5 CM M3 375,300.00 27,000.00 1.45 75,060.00 402,300.00 477,360.00 477,000.00
KAYU KLS I M3 6,451,500.00 27,000.00 - - 6,478,500.00 6,478,500.00 6,479,000.00
KAYU KLS II M3 2,932,500.00 27,000.00 - - 2,959,500.00 2,959,500.00 2,960,000.00
KERIKIL M3 293,200.00 27,000.00 1.35 58,640.00 320,200.00 378,840.00 379,000.00
KERIKIL SARING M3 322,500.00 27,000.00 1.35 64,500.00 349,500.00 414,000.00 414,000.00
PASIR PASANGAN M3 351,900.00 27,000.00 1.40 70,380.00 378,900.00 449,280.00 449,000.00
PASIR BETON (KASAR) M3 351,900.00 27,000.00 1.40 70,380.00 378,900.00 449,280.00 449,000.00
PASIR TIMBUNAN M3 234,600.00 27,000.00 1.40 46,920.00 261,600.00 308,520.00 309,000.00
SIRTU M3 234,600.00 27,000.00 - 46,920.00 261,600.00 308,520.00 309,000.00
TANAH TIMBUNAN M3 234,600.00 27,000.00 - 46,920.00 261,600.00 308,520.00 309,000.00
BAHAN PILIHAN M3 - - - - - - -
BAHAN AGREGAT KLS C M3 234,600.00 - - - 234,600.00 234,600.00 235,000.00
CLAY M3 - - - - - - -

BAHAN NON LOKAL -


ASPAL Kg 18,700.00 27,000.00 - - 45,700.00 45,700.00 46,000.00
BAJA KONSTRUKSI Kg 32,800.00 3,000.00 - - 35,800.00 35,800.00 36,000.00
BAJA TULANGAN Kg 17,500.00 300.00 - - 17,800.00 17,800.00 18,000.00
BAUT MUR DIAMETER 12 - 30 MM BUAH 5,800.00 3,000.00 - - 8,800.00 8,800.00 9,000.00
BUMBUNGAN ASBES M' 49,200.00 3,000.00 - - 52,200.00 52,200.00 52,000.00
BUMBUNGAN SENG PLAT M' 17,500.00 3,000.00 - - 20,500.00 20,500.00 21,000.00
BAK MANDI FIBER BUAH 410,500.00 3,000.00 - - 413,500.00 413,500.00 414,000.00
CAT DASAR SETARA KEMBANG Kg 29,300.00 300.00 - - 29,600.00 29,600.00 30,000.00
CAT BATU ALAM LITER 76,200.00 3,000.00 79,200.00 79,200.00 79,000.00
CERMIN LEMBAR 129,000.00 300.00 - - 129,300.00 129,300.00 129,000.00
DOOP AIR BUAH 29,300.00 300.00 - - 29,600.00 29,600.00 30,000.00
DEMPUL KAYU SETARA KEMBANG Kg 23,400.00 300.00 - - 23,700.00 23,700.00 24,000.00
ENGSEL JENDELA SETARA ALOHA SET 29,300.00 300.00 - - 29,600.00 29,600.00 30,000.00
ENGSEL JENDELA SETARA HINGS SET 29,300.00 300.00 - - 29,600.00 29,600.00 30,000.00
ENGSEL PINTU SETARA ALOHA SET 41,000.00 300.00 41,300.00 41,300.00 41,000.00
ENGSEL PINTU SETARA HINGS SET 41,000.00 300.00 - - 41,300.00 41,300.00 41,000.00
FLOOR DRAIN BUAH 29,300.00 300.00 - - 29,600.00 29,600.00 30,000.00
GENTENG ASBES M2 49,200.00 3,000.00 - - 52,200.00 52,200.00 52,000.00
GENTENG METAL RAINBOW M2 82,100.00 3,000.00 - - 85,100.00 85,100.00 85,000.00
GENTENG EX SAKURA ROOF M2 49,200.00 3,000.00 - - 52,200.00 52,200.00 52,000.00
BUBUNGAN EX SAKURA ROOF M2 49,200.00 3,000.00 - - 52,200.00 52,200.00 52,000.00
GRENDEL PINTU BUAH 26,300.00 300.00 26,600.00 26,600.00 27,000.00
GRENDEL JENDELA BUAH 9,900.00 300.00 - - 10,200.00 10,200.00 10,000.00
JENDELA NAKO 4 MATA SET 58,600.00 3,000.00 - - 61,600.00 61,600.00 62,000.00
JENDELA NAKO 5 MATA SET 58,600.00 3,000.00 61,600.00 61,600.00 62,000.00
JENDELA NAKO 6 MATA SET 70,300.00 3,000.00 73,300.00 73,300.00 73,000.00
JENDELA NAKO 7 MATA SET 82,100.00 3,000.00 85,100.00 85,100.00 85,000.00
KERAMIK 20 X 20 DOS 87,900.00 3,000.00 - - 90,900.00 90,900.00 91,000.00
KERAMIK 30 X 30 DOS 93,800.00 3,000.00 - - 96,800.00 96,800.00 97,000.00
KERAMIK 40 X 40 DOS 105,500.00 3,000.00 - - 108,500.00 108,500.00 109,000.00
KERAMIK 60 X 60 DOS 269,700.00 3,000.00 - - 272,700.00 272,700.00 273,000.00
KERAMIK DINDING POLOS DOS 111,400.00 3,000.00 - - 114,400.00 114,400.00 114,000.00
KABEL 1 URAT M' 8,200.00 300.00 - - 8,500.00 8,500.00 9,000.00
KACA POLOS 3 MM (122 X 152 ) LEMBAR 170,000.00 3,000.00 - - 173,000.00 173,000.00 173,000.00
KACA POLOS 5 MM (122 X 152 ) LEMBAR 258,000.00 3,000.00 - - 261,000.00 261,000.00 261,000.00
KACA RYBEN 3 MM (122 X 152 ) LEMBAR 175,900.00 3,000.00 - - 178,900.00 178,900.00 179,000.00
KACA RYBEN 5 MM (122 X 152 ) LEMBAR 269,700.00 3,000.00 - - 272,700.00 272,700.00 273,000.00
KAIT ANGIN BIASA BUAH 8,700.00 300.00 - - 9,000.00 9,000.00 9,000.00
KAIT ANGIN SETARA KZK BUAH 17,500.00 300.00 17,800.00 17,800.00 18,000.00
KAPUR API Kg 8,200.00 300.00 - - 8,500.00 8,500.00 9,000.00
KAWAT ANGIN M2 23,400.00 300.00 - - 23,700.00 23,700.00 24,000.00
KAWAT BAJA Kg 29,300.00 300.00 - - 29,600.00 29,600.00 30,000.00
KRAN AIR STAINLESS STEEL BUAH 76,200.00 300.00 - - 76,500.00 76,500.00 77,000.00
KRAN AIR KUNINGAN BUAH 29,300.00 300.00 - - 29,600.00 29,600.00 30,000.00
KERTAS GOSOK LEMBAR 3,500.00 300.00 - - 3,800.00 3,800.00 4,000.00
KLOSET DUDUK/INA BUAH 703,800.00 300.00 704,100.00 704,100.00 704,000.00
KLOSET JONGKOK SETARA INA BUAH 211,100.00 300.00 211,400.00 211,400.00 211,000.00
KLOSET JONGKOK SETARA TORINO BUAH 140,700.00 300.00 - - 141,000.00 141,000.00 141,000.00
KUNCI SETARA KUDA TERBANG SET 82,100.00 300.00 - - 82,400.00 82,400.00 82,000.00
KUNCI PUTAR SES SET 117,300.00 300.00 - - 117,600.00 117,600.00 118,000.00
KUNCI SETARA SES SET 175,900.00 300.00 - - 176,200.00 176,200.00 176,000.00
LAMPU PIJAR 100 WATT BUAH 23,400.00 300.00 - - 23,700.00 23,700.00 24,000.00
LAMPU PIJAR 25 WATT BUAH 11,700.00 300.00 12,000.00 12,000.00 12,000.00
LAMPU PIJAR 40 WATT BUAH 14,000.00 300.00 - - 14,300.00 14,300.00 14,000.00
LAMPU PIJAR 60 WATT BUAH 17,500.00 300.00 - - 17,800.00 17,800.00 18,000.00
LAMPU TL 10 WATT BUAH 41,000.00 300.00 - - 41,300.00 41,300.00 41,000.00
LAMPU TL 20 WATT BUAH 46,900.00 300.00 - - 47,200.00 47,200.00 47,000.00
LAMPU TL 40 WATT BUAH 70,300.00 300.00 - - 70,600.00 70,600.00 71,000.00
PAKU CAMPUR Kg 17,500.00 300.00 - - 17,800.00 17,800.00 18,000.00
PAKU JEMBATAN Kg 23,400.00 300.00 - - 23,700.00 23,700.00 24,000.00
PAKU SENG Kg 23,400.00 300.00 - - 23,700.00 23,700.00 24,000.00
PAKU TRIPLEKS Kg 23,400.00 300.00 - - 23,700.00 23,700.00 24,000.00
POLITUR LITER 67,400.00 300.00 - - 67,700.00 67,700.00 68,000.00
PLAMIR Kg 29,300.00 300.00 - - 29,600.00 29,600.00 30,000.00
PAVING BLOK BUAH 4,600.00 3,000.00 - - 7,600.00 7,600.00 8,000.00
SAKLAR GANDA TANAM BUAH 17,500.00 300.00 - - 17,800.00 17,800.00 18,000.00
SAKLAR GANDA TEMPEL BUAH 17,500.00 300.00 - - 17,800.00 17,800.00 18,000.00
SAKLAR TUNGGAL TANAM BUAH 17,500.00 300.00 - - 17,800.00 17,800.00 18,000.00
SAKLAR TUNGGAL TEMPEL BUAH 17,500.00 300.00 - - 17,800.00 17,800.00 18,000.00
SEMEN ZAK 87,900.00 3,000.00 - - 90,900.00 90,900.00 91,000.00
SEMEN PUTIH ZAK 164,200.00 3,000.00 - - 167,200.00 167,200.00 167,000.00
SENG GELOMBANG BJLS 0,20 LEMBAR 57,400.00 3,000.00 - - 60,400.00 60,400.00 60,000.00
SENG GELOMBANG BJLS 0,25 LEMBAR 70,300.00 3,000.00 - - 73,300.00 73,300.00 73,000.00
SENG PLAT BJLS 0,20 LEMBAR 57,400.00 3,000.00 - - 60,400.00 60,400.00 60,000.00
SENG PLAT BJLS 0,25 LEMBAR 70,300.00 3,000.00 - - 73,300.00 73,300.00 73,000.00
STOP KONTAK GANDA TANAM BUAH 29,300.00 300.00 - - 29,600.00 29,600.00 30,000.00
STOP KONTAK TUNGGAL TANAM BUAH 29,300.00 300.00 - - 29,600.00 29,600.00 30,000.00
STOP KONTAK GANDA TEMPEL BUAH 23,400.00 300.00 - - 23,700.00 23,700.00 24,000.00
STOP KONTAK TUNGGAL TEMPEL BUAH 23,400.00 300.00 - - 23,700.00 23,700.00 24,000.00
TEAKWOOD LEMBAR 164,200.00 300.00 - - 164,500.00 164,500.00 165,000.00
TEGEL SETARA AKURA WARNA ( 30 X 30 ) M2 82,100.00 3,000.00 - - 85,100.00 85,100.00 85,000.00
TEGEL SETARA AKURA ( 30 X 30 ) M2 87,900.00 3,000.00 - - 90,900.00 90,900.00 91,000.00
TEGEL SETARA MASTERINA (10 X 20 ) M2 99,700.00 3,000.00 - - 102,700.00 102,700.00 103,000.00
TEGEL SETARA MASTERINA (20 X 20 ) M2 105,500.00 3,000.00 - - 108,500.00 108,500.00 109,000.00
THINER A LITER 38,700.00 300.00 - - 39,000.00 39,000.00 39,000.00
THINER SUPER LITER 41,000.00 300.00 - - 41,300.00 41,300.00 41,000.00
TRIPLEKS 3 MM LEMBAR 72,700.00 3,000.00 - - 75,700.00 75,700.00 76,000.00
TRIPLEKS 5 MM LEMBAR 117,300.00 3,000.00 - - 120,300.00 120,300.00 120,000.00
TANDON AIR 1100 LITER BUAH 1,876,800.00 3,000.00 - - 1,879,800.00 1,879,800.00 1,880,000.00
TANDON AIR 2200 LITER BUAH 3,401,700.00 3,000.00 - - 3,404,700.00 3,404,700.00 3,405,000.00
VITING GANTUNG BUAH 5,800.00 300.00 - - 6,100.00 6,100.00 6,000.00
VITING TEMPEL BUAH 5,800.00 300.00 - - 6,100.00 6,100.00 6,000.00
WASTAVEL SET 527,800.00 300.00 - - 528,100.00 528,100.00 528,000.00
KAWAT LAS SET 29,300.00 300.00 - - 29,600.00 29,600.00 30,000.00
PIPA GIP MEDIUM 'A' DIAMETER 1/2" STAF 164,200.00 22,000.00 - - 186,200.00 186,200.00 186,000.00
PIPA GIP MEDIUM 'A' DIAMETER 3/4 " STAF 211,100.00 22,000.00 - - 233,100.00 233,100.00 233,000.00
PIPA GIP MEDIUM 'A'METER 1" STAF 269,700.00 22,000.00 - - 291,700.00 291,700.00 292,000.00
PIPA GIP MEDIUM 'A' DIAMETER 1.5" STAF 504,300.00 22,000.00 - - 526,300.00 526,300.00 526,000.00
PIPA GIP MEDIUM 'A' DIAMETER 2" STAF 645,100.00 22,000.00 - - 667,100.00 667,100.00 667,000.00
PIPA GIP MEDIUM 'A' DIAMETER 2.5" STAF 803,500.00 22,000.00 - - 825,500.00 825,500.00 826,000.00
PIPA GIP MEDIUM 'A' DIAMETER 3" STAF 1,114,300.00 22,000.00 - - 1,136,300.00 1,136,300.00 1,136,000.00
PIPA GIP MEDIUM 'A' DIAMETER 4" STAF 1,642,200.00 22,000.00 - - 1,664,200.00 1,664,200.00 1,664,000.00
PIPA GIP MEDIUM 'B' DIAMETER 1/2" STAF 105,500.00 22,000.00 - - 127,500.00 127,500.00 128,000.00
PIPA GIP MEDIUM 'B' DIAMETER 3/4 " STAF 134,800.00 22,000.00 - - 156,800.00 156,800.00 157,000.00
PIPA GIP MEDIUM 'B'DIAMETER 1" STAF 164,200.00 22,000.00 - - 186,200.00 186,200.00 186,000.00
PIPA GIP MEDIUM 'B' DIAMETER 1 1/2" STAF 228,700.00 22,000.00 - - 250,700.00 250,700.00 251,000.00
PIPA GIP MEDIUM'B' DIAMETER 2" STAF 287,300.00 22,000.00 - - 309,300.00 309,300.00 309,000.00
PIPA GIP MEDIUM'B' DIAMETER 3" STAF 774,100.00 22,000.00 - - 796,100.00 796,100.00 796,000.00
PIPA GIP MEDIUM 'B' DIAMETER 4" STAF 997,000.00 22,000.00 - - 1,019,000.00 1,019,000.00 1,019,000.00
PIPA GIP MEDIUM 'B' DIAMETER 6" STAF 1,290,300.00 22,000.00 - - 1,312,300.00 1,312,300.00 1,312,000.00
PIPA PVC AW DIAMETER 1/2" STAF 26,300.00 14,000.00 - - 40,300.00 40,300.00 40,000.00
PIPA PVC AW DIAMETER 3/4 " STAF 41,000.00 14,000.00 - - 55,000.00 55,000.00 55,000.00
PIPA PVC AW DIAMETER 1" STAF 46,900.00 14,000.00 - - 60,900.00 60,900.00 61,000.00
PIPA PVC AW DIAMETER 1 1/2" STAF 79,100.00 14,000.00 - - 93,100.00 93,100.00 93,000.00
PIPA PVC AW DIAMETER 2" STAF 102,600.00 14,000.00 - - 116,600.00 116,600.00 117,000.00
PIPA PVC AW DIAMETER 3" STAF 193,500.00 14,000.00 - - 207,500.00 207,500.00 208,000.00
PIPA PVC AW DIAMETER 4" STAF 310,800.00 14,000.00 - - 324,800.00 324,800.00 325,000.00
PIPA PVC AW DIAMETER 6" STAF 410,500.00 14,000.00 - - 424,500.00 424,500.00 425,000.00
BEND GIP DIA 1/2" 90 DERAJAT BUAH 23,400.00 300.00 - - 23,700.00 23,700.00 24,000.00
BEND GIP DIA 3/4" 90 DERAJAT BUAH 23,400.00 300.00 - - 23,700.00 23,700.00 24,000.00
BEND GIP DIA 1" 90 DERAJAT BUAH 29,300.00 300.00 - - 29,600.00 29,600.00 30,000.00
BEND GIP DIA 1.5" 90 DERAJAT BUAH 29,300.00 300.00 - - 29,600.00 29,600.00 30,000.00
BEND GIP DIA 2" 90 DERAJAT BUAH 35,100.00 300.00 - - 35,400.00 35,400.00 35,000.00
BEND GIP DIA 3" 90 DERAJAT BUAH 35,100.00 300.00 - - 35,400.00 35,400.00 35,000.00
CLAMB SADLE GIP 2"- 3/4" BUAH 35,100.00 300.00 - - 35,400.00 35,400.00 35,000.00
CLAMB SADLE GIP 1.5"- 1/5" BUAH 58,600.00 300.00 - - 58,900.00 58,900.00 59,000.00
KNEE GIP DIA 1/2" BUAH 7,000.00 300.00 - - 7,300.00 7,300.00 7,000.00
KNEE GIP DIA 3/4" BUAH 10,500.00 300.00 - - 10,800.00 10,800.00 11,000.00
KNEE GIP DIA 1" BUAH 11,700.00 300.00 - - 12,000.00 12,000.00 12,000.00
KNEE GIP DIA 1.5" BUAH 26,300.00 300.00 - - 26,600.00 26,600.00 27,000.00
KNEE GIP DIA 2" BUAH 41,000.00 300.00 - - 41,300.00 41,300.00 41,000.00
KNEE GIP DIA 3" BUAH 117,300.00 300.00 - - 117,600.00 117,600.00 118,000.00
ELBOW GIP 1/2" BUAH 11,700.00 300.00 - - 12,000.00 12,000.00 12,000.00
ELBOW GIP 3/4" BUAH 14,000.00 300.00 - - 14,300.00 14,300.00 14,000.00
ELBOW GIP 1" BUAH 17,500.00 300.00 - - 17,800.00 17,800.00 18,000.00
ELBOW GIP 1.5" BUAH 17,500.00 300.00 - - 17,800.00 17,800.00 18,000.00
ELBOW GIP 2" BUAH 23,400.00 300.00 - - 23,700.00 23,700.00 24,000.00
ELBOW GIP 3" BUAH 29,300.00 300.00 - - 29,600.00 29,600.00 30,000.00
STOP KRAN Dia 1" BUAH 23,400.00 300.00 - - 23,700.00 23,700.00 24,000.00
STOP KRAN Dia 1.5" BUAH 76,200.00 300.00 - - 76,500.00 76,500.00 77,000.00
STOP KRAN Dia 2" BUAH 93,800.00 300.00 - - 94,100.00 94,100.00 94,000.00
STOP KRAN Dia 3" BUAH 35,100.00 300.00 - - 35,400.00 35,400.00 35,000.00
STOP KRAN Dia 4" BUAH 35,100.00 300.00 - - 35,400.00 35,400.00 35,000.00
WATER MOOR DIA 1/2" BUAH 26,300.00 300.00 - - 26,600.00 26,600.00 27,000.00
WATER MOOR DIA 3/4" BUAH 29,300.00 300.00 - - 29,600.00 29,600.00 30,000.00
WATER MOOR DIA 1" BUAH 35,100.00 300.00 - - 35,400.00 35,400.00 35,000.00
WATER MOOR DIA 1.5" BUAH 70,300.00 300.00 - - 70,600.00 70,600.00 71,000.00
WATER MOOR DIA 2" BUAH 99,700.00 300.00 - - 100,000.00 100,000.00 100,000.00
WATER MOOR DIA 3" BUAH 263,900.00 300.00 - - 264,200.00 264,200.00 264,000.00
CLAMB PVC DIA 3X 3/4" BUAH 11,700.00 300.00 - - 12,000.00 12,000.00 12,000.00
CLAMB PVC DIA 2X 3/4" BUAH 11,700.00 300.00 - - 12,000.00 12,000.00 12,000.00
CLAMB PVC DIA 1.5X 3/4" BUAH 11,700.00 300.00 - - 12,000.00 12,000.00 12,000.00
DOP PIPA PVC DIA 1" BUAH 3,500.00 300.00 - - 3,800.00 3,800.00 4,000.00
TEE SOCKET PVC 1 X 1" BUAH 5,800.00 300.00 - - 6,100.00 6,100.00 6,000.00
TEE SOCKET PVC 1.5" X 1.5" BUAH 5,800.00 300.00 - - 6,100.00 6,100.00 6,000.00
TEE SOCKET PVC 2" X 1.5" BUAH 8,700.00 300.00 - - 9,000.00 9,000.00 9,000.00
TEE SOCKET PVC 2" X 2" BUAH 8,700.00 300.00 - - 9,000.00 9,000.00 9,000.00
TEE SOCKET PVC 3" X 3" BUAH 17,500.00 300.00 - - 17,800.00 17,800.00 18,000.00
TEE SOCKET PVC 4" X 3" BUAH 35,100.00 300.00 - - 35,400.00 35,400.00 35,000.00
ELBOW PVC DIAMETER 1 " BUAH 5,800.00 300.00 - - 6,100.00 6,100.00 6,000.00
ELBOW PVC DIAMETER 2" BUAH 8,700.00 300.00 - - 9,000.00 9,000.00 9,000.00
ELBOW PVC DIAMETER 3/4" BUAH 4,600.00 300.00 - - 4,900.00 4,900.00 5,000.00
BESI HOLLOW 4 X 4 STAF 198,200.00 3,000.00 - - 201,200.00 201,200.00 201,000.00
BESI HOLLOW 4 X 6 STAF 222,800.00 3,000.00 - - 225,800.00 225,800.00 226,000.00
BESI HOLLOW 2 X 4 STAF 146,600.00 3,000.00 - - 149,600.00 149,600.00 150,000.00
ALUMANIUM KUSEN BATANG - - - - - -
MINYAK TANAH LITER 5,200.00 300.00 - - 5,500.00 5,500.00 6,000.00
SOLAR LITER 10,500.00 300.00 - - 10,800.00 10,800.00 11,000.00
BENSIN/PREMIUM LITER 10,500.00 300.00 - - 10,800.00 10,800.00 11,000.00
PLASTIK FILTER BUAH 35,100.00 - - - 35,100.00 35,100.00 35,000.00
PINTU AIR B= 0.8 M, H = 0.80 M BUAH - - - - - - -
PINTU AIR B= 0.5 M, H = 0.50 M BUAH - - - - - - -
AIR KERJA LITER 200.00 300.00 - - 500.00 500.00 500.00
PLINT KERAMIK 10 X 10 M1 28,000.00 3,000.00 - - 31,000.00 31,000.00 31,000.00
LIST PLAFON PROFIL KAYU M1 100,000.00 3,000.00 - - 103,000.00 103,000.00 103,000.00
LEM KAYU M2 160,000.00 300.00 - - 160,300.00 160,300.00 160,000.00
BESSI STRIP M' 95,000.00 3,000.00 - - 98,000.00 98,000.00 98,000.00
KUNCI TANAM 2 SLAAG BH 250,000.00 300.00 - - 250,300.00 250,300.00 250,000.00
KUNCI TANAM KAMAR MANDI BH 70,000.00 300.00 - - 70,300.00 70,300.00 70,000.00
CAT MANIE KG 30,000.00 300.00 - - 30,300.00 30,300.00 30,000.00
PLAMUUR KG 46,500.00 300.00 - - 46,800.00 46,800.00 47,000.00
CAT DASAR JAYU KG 57,500.00 300.00 - - 57,800.00 57,800.00 58,000.00
CAT PENUTUP KAYU KG 79,000.00 300.00 - - 79,300.00 79,300.00 79,000.00
KUAS KG 6,000.00 300.00 - - 6,300.00 6,300.00 6,000.00
PENGENCER KG 46,900.00 300.00 - - 47,200.00 47,200.00 47,000.00
AMPLAS KG 6,000.00 300.00 - - 6,300.00 6,300.00 6,000.00
CAT DASAR TEMBOK KG 150,000.00 300.00 - - 150,300.00 150,300.00 150,000.00
CAT PENUTUP TEMBOK KG 150,000.00 300.00 - - 150,300.00 150,300.00 150,000.00
URINOIR LOKAL PUTIH UNIT 900,000.00 300.00 - - 900,300.00 900,300.00 900,000.00
WASTAVEL UNIT 1,225,000.00 300.00 - - 1,225,300.00 1,225,300.00 1,225,000.00
FLOOR DRAIN BESSI BH 175,000.00 300.00 - - 175,300.00 175,300.00 175,000.00
GYPSUM BORD LBR 87,000.00 300.00 - - 87,300.00 87,300.00 87,000.00
SEKRUP GYPSUM BORD DOS 85,000.00 300.00 - - 85,300.00 85,300.00 85,000.00
SEAL TAPE BH 6,000.00 300.00 - - 6,300.00 6,300.00 6,000.00
KABEL NYM 3 X 2.5 M 25,000.00 300.00 - - 25,300.00 25,300.00 25,000.00
PIPA LISTRIK M 15,000.00 300.00 - - 15,300.00 15,300.00 15,000.00
SOCKET PIPA BH 20,000.00 300.00 - - 20,300.00 20,300.00 20,000.00
T DOS BH 6,500.00 300.00 - - 6,800.00 6,800.00 7,000.00
KLEM PIPA BH 25,000.00 300.00 - - 25,300.00 25,300.00 25,000.00
LAS DOP BH 22,000.00 300.00 - - 22,300.00 22,300.00 22,000.00
MCB 35 AMPER BH 325,000.00 300.00 - - 325,300.00 325,300.00 325,000.00
L BOW BH 5,000.00 300.00 - - 5,300.00 5,300.00 5,000.00
MONGKOK LISTRIK BH 2,000.00 300.00 - - 2,300.00 2,300.00 2,000.00
GENTENG METAL BH 77,500.00 300.00 - - 77,800.00 77,800.00 78,000.00
BUMBUNGAN GENTENG M' 57,000.00 300.00 - - 57,300.00 57,300.00 57,000.00
BAJA CANAL 75/100 0 175,000.00 300.00 - - 175,300.00 175,300.00 175,000.00
PAKU GENTENG KG 30,000.00 300.00 - - 30,300.00 30,300.00 30,000.00
SEKRUP RENG BH 3,000.00 300.00 - - 3,300.00 3,300.00 3,000.00
RENG M 55,000.00 300.00 - - 55,300.00 55,300.00 55,000.00
DINABOLT BH 5,000.00 300.00 - - 5,300.00 5,300.00 5,000.00
TALANG JURAI DALAM BH 27,000.00 300.00 - - 27,300.00 27,300.00 27,000.00

URAIAN SAT Harga Ongkos Ongkos Berat Jenis Galian C Harga Over Head Jumlah PEMBULATAN
Dasar Transport Naik/turun 20% x (4) x BJ Lokasi 15% (7+8) (Rp)
Quary (4+5+6) (4)+(5)x15%
2 3 4 5 6 7 8 9 10 13

Mandor Hari 150,000.00 - - - - 150,000.00 150,000.00 150,000.00


Kepala Tukang Hari 130,000.00 - - - - 130,000.00 130,000.00 130,000.00
Tukang Batu Hari 120,000.00 - - - - 120,000.00 120,000.00 120,000.00
Tukang Besi Hari 120,000.00 - - - - 120,000.00 120,000.00 120,000.00
Tukang Cat Hari 120,000.00 - - - - 120,000.00 120,000.00 120,000.00
Pekerja Hari 117,700.00 - - - - 117,700.00 117,700.00 118,000.00

- - - - - - - - -

0.08
12.50
24,000.00
PEMBANDING DAFTAR HARGA UPAH DAN BAHAN

JUMLAH BASIC PRICE 2017


SATUAN UD TANETE CV NESSTA RATA RATA
No. BAHAN / TENAGA HARGA SEMESTER II ANGIN TIMUR (Rp.) TOKO LEE (Rp.) TERENDAH (Rp.) TERTINGGI (Rp.) HARGA PASAR
(Rp.) (Rp.) (Rp.) (Rp.)
(Rp.) (Rp.)

HARGA UPAH

1 Tukang batu,kayu,cat,besi / hari 120,000.00 120,000.00 120,000.00 120,000.00 120,000.00


2 Kepala Tukang / hari 130,000.00 130,000.00 130,000.00 130,000.00 130,000.00
3 Mandor / hari 150,000.00 150,000.00 150,000.00 150,000.00 150,000.00
4 Pekerja / hari 117,700.00 117,700.00 117,700.00 117,700.00 117,700.00

HARGA BAHAN

LOKAL
1 ABU BATU M3 205,200.00 205,200.00 205,200.00 205,200.00 205,200.00
2 BATU BATA MERAH BUAH 1,700.00 1,700.00 1,700.00 1,700.00 1,700.00
3 BATU KALI M3 351,900.00 351,900.00 351,900.00 351,900.00 351,900.00
4 BATU BELAH M3 351,900.00 351,900.00 351,900.00 351,900.00 351,900.00
4 BATU KARANG / GUNUNG M3 351,900.00 351,900.00 351,900.00 351,900.00 351,900.00
5 BATU PECAH 1/2 CM M3 410,500.00 410,500.00 410,500.00 410,500.00 410,500.00
6 BATU PECAH 2/3 CM M3 410,500.00 410,500.00 410,500.00 410,500.00 410,500.00
7 BATU PECAH 5/7 DAN 3/5 CM M3 375,300.00 375,300.00 375,300.00 375,300.00 375,300.00
8 KAYU KLS I M3 6,451,500.00 6,451,500.00 6,451,500.00 6,451,500.00 6,451,500.00
9 KAYU KLS II M3 2,932,500.00 2,932,500.00 2,932,500.00 2,932,500.00 2,932,500.00
10 KERIKIL M3 293,200.00 293,200.00 293,200.00 293,200.00 293,200.00
11 KERIKIL SARING M3 322,500.00 322,500.00 322,500.00 322,500.00 322,500.00
12 PASIR PASANGAN M3 351,900.00 351,900.00 351,900.00 351,900.00 351,900.00
13 PASIR BETON (KASAR) M3 351,900.00 351,900.00 351,900.00 351,900.00 351,900.00
14 PASIR TIMBUNAN M3 234,600.00 234,600.00 234,600.00 234,600.00 234,600.00
15 SIRTU M3 234,600.00 234,600.00 234,600.00 234,600.00 234,600.00
16 TANAH TIMBUNAN M3 234,600.00 234,600.00 234,600.00 234,600.00 234,600.00
17 BAHAN PILIHAN M4 - - 0.00 0.00 0.00
18 BAHAN AGREGAT KLS C M5 234,600.00 234,600.00 234,600.00 234,600.00 234,600.00
19 CLAY M6 - -

NON LOKAL
1 ASPAL Kg 18,700.00 18,700.00 18,700.00 18,700.00 18,700.00 45,000.00
2 BAJA KONSTRUKSI Kg 32,800.00 32,800.00 32,800.00 32,800.00 32,800.00 20,000.00
3 BAJA TULANGAN Kg 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00
4 BAUT MUR DIAMETER 12 - 30 MM BUAH 5,800.00 5,800.00 5,800.00 5,800.00 5,800.00 167,500.00
5 BUMBUNGAN ASBES M' 49,200.00 49,200.00 49,200.00 49,200.00 49,200.00
6 BUMBUNGAN SENG PLAT M' 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00
7 BAK MANDI FIBER BUAH 410,500.00 410,500.00 410,500.00 410,500.00 410,500.00
8 CAT DASAR SETARA KEMBANG Kg 29,300.00 29,300.00 29,300.00 29,300.00 29,300.00
9 CAT DINDING SETARA METROLAIT Kg 35,100.00 35,100.00 35,100.00 35,100.00 35,100.00
10 CAT MARKA JALAN Kg 64,500.00 64,500.00 64,500.00 64,500.00 64,500.00
11 CAT MENY SETARA KEMBANG Kg 29,300.00 29,300.00 29,300.00 29,300.00 29,300.00 20,000.00
12 CAT MINYAK SETARA GLOTEKS Kg 64,500.00 64,500.00 64,500.00 64,500.00 64,500.00
13 CAT ANTI LUMUT (EX MOWILEX) Kg 76,200.00 76,200.00 76,200.00 76,200.00 76,200.00 70,000.00
14 CAT BATU ALAM LITER 76,200.00 76,200.00 76,200.00 76,200.00 76,200.00
15 CERMIN LEMBAR 129,000.00 129,000.00 129,000.00 129,000.00 129,000.00
16 DOOP AIR BUAH 29,300.00 29,300.00 29,300.00 29,300.00 29,300.00
17 DEMPUL KAYU SETARA KEMBANG Kg 23,400.00 23,400.00 23,400.00 23,400.00 23,400.00
18 ENGSEL JENDELA SETARA ALOHA SET 29,300.00 29,300.00 29,300.00 29,300.00 29,300.00
19 ENGSEL JENDELA SETARA HINGS SET 29,300.00 29,300.00 29,300.00 29,300.00 29,300.00
20 ENGSEL PINTU SETARA ALOHA SET 41,000.00 41,000.00 41,000.00 41,000.00 41,000.00
21 ENGSEL PINTU SETARA HINGS SET 41,000.00 41,000.00 41,000.00 41,000.00 41,000.00
22 FLOOR DRAIN BUAH 29,300.00 29,300.00 29,300.00 29,300.00 29,300.00
23 GENTENG ASBES M2 49,200.00 49,200.00 49,200.00 49,200.00 49,200.00
24 GENTENG METAL RAINBOW M2 82,100.00 82,100.00 82,100.00 82,100.00 82,100.00
25 GENTENG EX SAKURA ROOF M2 49,200.00 49,200.00 49,200.00 49,200.00 49,200.00
26 BUBUNGAN EX SAKURA ROOF M2 49,200.00 49,200.00 49,200.00 49,200.00 49,200.00
27 GRENDEL PINTU BUAH 26,300.00 26,300.00 26,300.00 26,300.00 26,300.00
28 GRENDEL JENDELA BUAH 9,900.00 9,900.00 9,900.00 9,900.00 9,900.00 48,000.00
29 JENDELA NAKO 4 MATA SET 58,600.00 58,600.00 58,600.00 58,600.00 58,600.00
30 JENDELA NAKO 5 MATA SET 58,600.00 58,600.00 58,600.00 58,600.00 58,600.00 280,000.00
31 JENDELA NAKO 6 MATA SET 70,300.00 70,300.00 70,300.00 70,300.00 70,300.00
32 JENDELA NAKO 7 MATA SET 82,100.00 82,100.00 82,100.00 82,100.00 82,100.00 185,000.00
33 KERAMIK 20 X 20 DOS 87,900.00 87,900.00 87,900.00 87,900.00 87,900.00 390,000.00
34 KERAMIK 30 X 30 DOS 93,800.00 93,800.00 93,800.00 93,800.00 93,800.00
35 KERAMIK 40 X 40 DOS 105,500.00 105,500.00 105,500.00 105,500.00 105,500.00 110,000.00
36 KERAMIK 60 X 60 DOS 269,700.00 269,700.00 269,700.00 269,700.00 269,700.00
37 KERAMIK DINDING POLOS DOS 111,400.00 111,400.00 111,400.00 111,400.00 111,400.00 20,000.00
38 KABEL 1 URAT M' 8,200.00 8,200.00 8,200.00 8,200.00 8,200.00
39 KACA POLOS 3 MM (122 X 152 ) LEMBAR 170,000.00 170,000.00 170,000.00 170,000.00 170,000.00 110,000.00
40 KACA POLOS 5 MM (122 X 152 ) LEMBAR 258,000.00 258,000.00 258,000.00 258,000.00 258,000.00 115,000.00
41 KACA RYBEN 3 MM (122 X 152 ) LEMBAR 175,900.00 175,900.00 175,900.00 175,900.00 175,900.00
42 KACA RYBEN 5 MM (122 X 152 ) LEMBAR 269,700.00 269,700.00 269,700.00 269,700.00 269,700.00
43 KAIT ANGIN BIASA BUAH 8,700.00 8,700.00 8,700.00 8,700.00 8,700.00 20,000.00
44 KAIT ANGIN SETARA KZK BUAH 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 20,000.00
45 KAPUR API Kg 8,200.00 8,200.00 8,200.00 8,200.00 8,200.00 30,000.00
46 KAWAT ANGIN M2 23,400.00 23,400.00 23,400.00 23,400.00 23,400.00
47 KAWAT BAJA Kg 29,300.00 29,300.00 29,300.00 29,300.00 29,300.00 140,000.00
48 KRAN AIR STAINLESS STEEL BUAH 76,200.00 76,200.00 76,200.00 76,200.00 76,200.00 8,500.00
49 KRAN AIR KUNINGAN BUAH 29,300.00 29,300.00 29,300.00 29,300.00 29,300.00 12,000.00
50 KERTAS GOSOK LEMBAR 3,500.00 3,500.00 3,500.00 3,500.00 3,500.00 12,000.00
51 KLOSET DUDUK/INA BUAH 703,800.00 703,800.00 703,800.00 703,800.00 703,800.00 16,000.00
52 KLOSET JONGKOK SETARA INA BUAH 211,100.00 211,100.00 211,100.00 211,100.00 211,100.00
53 KLOSET JONGKOK SETARA TORINO BUAH 140,700.00 140,700.00 140,700.00 140,700.00 140,700.00
54 KUNCI SETARA KUDA TERBANG SET 82,100.00 82,100.00 82,100.00 82,100.00 82,100.00 230,000.00
55 KUNCI PUTAR SES SET 117,300.00 117,300.00 117,300.00 117,300.00 117,300.00
56 KUNCI SETARA SES SET 175,900.00 175,900.00 175,900.00 175,900.00 175,900.00
57 LAMPU PIJAR 100 WATT BUAH 23,400.00 23,400.00 23,400.00 23,400.00 23,400.00
58 LAMPU PIJAR 25 WATT BUAH 11,700.00 11,700.00 11,700.00 11,700.00 11,700.00
59 LAMPU PIJAR 40 WATT BUAH 14,000.00 14,000.00 14,000.00 14,000.00 14,000.00 55,000.00
60 LAMPU PIJAR 60 WATT BUAH 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 175,000.00
61 LAMPU TL 10 WATT BUAH 41,000.00 41,000.00 41,000.00 41,000.00 41,000.00 28,000.00
62 LAMPU TL 20 WATT BUAH 46,900.00 46,900.00 46,900.00 46,900.00 46,900.00
63 LAMPU TL 40 WATT BUAH 70,300.00 70,300.00 70,300.00 70,300.00 70,300.00
64 PAKU CAMPUR Kg 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00
65 PAKU JEMBATAN Kg 23,400.00 23,400.00 23,400.00 23,400.00 23,400.00
66 PAKU SENG Kg 23,400.00 23,400.00 23,400.00 23,400.00 23,400.00
67 PAKU TRIPLEKS Kg 23,400.00 23,400.00 23,400.00 23,400.00 23,400.00
68 POLITUR LITER 67,400.00 67,400.00 67,400.00 67,400.00 67,400.00 150,000.00
69 PLAMIR Kg 29,300.00 29,300.00 29,300.00 29,300.00 29,300.00 150,000.00
70 PAVING BLOK BUAH 4,600.00 4,600.00 4,600.00 4,600.00 4,600.00 3,450,000.00
71 SAKLAR GANDA TANAM BUAH 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 2,000,000.00
72 SAKLAR GANDA TEMPEL BUAH 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 1,650,000.00
73 SAKLAR TUNGGAL TANAM BUAH 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00
74 SAKLAR TUNGGAL TEMPEL BUAH 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00
75 SEMEN ZAK 87,900.00 87,900.00 87,900.00 87,900.00 87,900.00 37,000.00
76 SEMEN PUTIH ZAK 164,200.00 164,200.00 164,200.00 164,200.00 164,200.00 80,000.00
77 SENG GELOMBANG BJLS 0,20 LEMBAR 57,400.00 57,400.00 57,400.00 57,400.00 57,400.00 14,000.00
78 SENG GELOMBANG BJLS 0,25 LEMBAR 70,300.00 70,300.00 70,300.00 70,300.00 70,300.00
79 SENG PLAT BJLS 0,20 LEMBAR 57,400.00 57,400.00 57,400.00 57,400.00 57,400.00 80,000.00
80 SENG PLAT BJLS 0,25 LEMBAR 70,300.00 70,300.00 70,300.00 70,300.00 70,300.00
81 STOP KONTAK GANDA TANAM BUAH 29,300.00 29,300.00 29,300.00 29,300.00 29,300.00 19,000.00
82 STOP KONTAK TUNGGAL TANAM BUAH 29,300.00 29,300.00 29,300.00 29,300.00 29,300.00
83 STOP KONTAK GANDA TEMPEL BUAH 23,400.00 23,400.00 23,400.00 23,400.00 23,400.00 80,000.00
84 STOP KONTAK TUNGGAL TEMPEL BUAH 23,400.00 23,400.00 23,400.00 23,400.00 23,400.00
85 TEAKWOOD LEMBAR 164,200.00 164,200.00 164,200.00 164,200.00 164,200.00
86 TEGEL SETARA AKURA WARNA ( 30 X 30 ) M2 82,100.00 82,100.00 82,100.00 82,100.00 82,100.00
87 TEGEL SETARA AKURA ( 30 X 30 ) M2 87,900.00 87,900.00 87,900.00 87,900.00 87,900.00
88 TEGEL SETARA MASTERINA (10 X 20 ) M2 99,700.00 99,700.00 99,700.00 99,700.00 99,700.00
89 TEGEL SETARA MASTERINA (20 X 20 ) M2 105,500.00 105,500.00 105,500.00 105,500.00 105,500.00
90 THINER A LITER 38,700.00 38,700.00 38,700.00 38,700.00 38,700.00 3,000.00
91 THINER SUPER LITER 41,000.00 41,000.00 41,000.00 41,000.00 41,000.00 75,000.00
92 TRIPLEKS 3 MM LEMBAR 72,700.00 72,700.00 72,700.00 72,700.00 72,700.00 450,000.00
93 TRIPLEKS 5 MM LEMBAR 117,300.00 117,300.00 117,300.00 117,300.00 117,300.00
94 TANDON AIR 1100 LITER BUAH 1,876,800.00 1,876,800.00 1,876,800.00 1,876,800.00 1,876,800.00 12,000.00
95 TANDON AIR 2200 LITER BUAH 3,401,700.00 3,401,700.00 3,401,700.00 3,401,700.00 3,401,700.00 16,000.00
96 VITING GANTUNG BUAH 5,800.00 5,800.00 5,800.00 5,800.00 5,800.00
97 VITING TEMPEL BUAH 5,800.00 5,800.00 5,800.00 5,800.00 5,800.00 20,000.00
98 WASTAVEL SET 527,800.00 527,800.00 527,800.00 527,800.00 527,800.00
99 KAWAT LAS SET 29,300.00 29,300.00 29,300.00 29,300.00 29,300.00 5,000.00
100 PIPA GIP MEDIUM 'A' DIAMETER 1/2" STAF 164,200.00 164,200.00 164,200.00 164,200.00 164,200.00
101 PIPA GIP MEDIUM 'A' DIAMETER 3/4 " STAF 211,100.00 211,100.00 211,100.00 211,100.00 211,100.00
102 PIPA GIP MEDIUM 'A'METER 1" STAF 269,700.00 269,700.00 269,700.00 269,700.00 269,700.00 283,000.00
103 PIPA GIP MEDIUM 'A' DIAMETER 1.5" STAF 504,300.00 504,300.00 504,300.00 504,300.00 504,300.00 23,000.00
104 PIPA GIP MEDIUM 'A' DIAMETER 2" STAF 645,100.00 645,100.00 645,100.00 645,100.00 645,100.00 22,000.00
105 PIPA GIP MEDIUM 'A' DIAMETER 2.5" STAF 803,500.00 803,500.00 803,500.00 803,500.00 803,500.00
106 PIPA GIP MEDIUM 'A' DIAMETER 3" STAF 1,114,300.00 1,114,300.00 1,114,300.00 1,114,300.00 1,114,300.00 65,000.00
107 PIPA GIP MEDIUM 'A' DIAMETER 4" STAF 1,642,200.00 1,642,200.00 1,642,200.00 1,642,200.00 1,642,200.00 122,000.00
108 PIPA GIP MEDIUM 'B' DIAMETER 1/2" STAF 105,500.00 105,500.00 105,500.00 105,500.00 105,500.00 199,000.00
109 PIPA GIP MEDIUM 'B' DIAMETER 3/4 " STAF 134,800.00 134,800.00 134,800.00 134,800.00 134,800.00 155,000.00
110 PIPA GIP MEDIUM 'B'DIAMETER 1" STAF 164,200.00 164,200.00 164,200.00 164,200.00 164,200.00 182,000.00
111 PIPA GIP MEDIUM 'B' DIAMETER 1 1/2" STAF 228,700.00 228,700.00 228,700.00 228,700.00 228,700.00
112 PIPA GIP MEDIUM'B' DIAMETER 2" STAF 287,300.00 287,300.00 287,300.00 287,300.00 287,300.00
113 PIPA GIP MEDIUM'B' DIAMETER 3" STAF 774,100.00 774,100.00 774,100.00 774,100.00 774,100.00 65,000.00
114 PIPA GIP MEDIUM 'B' DIAMETER 4" STAF 997,000.00 997,000.00 997,000.00 997,000.00 997,000.00 40,000.00
115 PIPA GIP MEDIUM 'B' DIAMETER 6" STAF 1,290,300.00 1,290,300.00 1,290,300.00 1,290,300.00 1,290,300.00 270,000.00
116 PIPA PVC AW DIAMETER 1/2" STAF 26,300.00 26,300.00 26,300.00 26,300.00 26,300.00 110,000.00
117 PIPA PVC AW DIAMETER 3/4 " STAF 41,000.00 41,000.00 41,000.00 41,000.00 41,000.00 150,000.00
118 PIPA PVC AW DIAMETER 1" STAF 46,900.00 46,900.00 46,900.00 46,900.00 46,900.00 440,000.00
119 PIPA PVC AW DIAMETER 1 1/2" STAF 79,100.00 79,100.00 79,100.00 79,100.00 79,100.00 32,500.00
120 PIPA PVC AW DIAMETER 2" STAF 102,600.00 102,600.00 102,600.00 102,600.00 102,600.00
121 PIPA PVC AW DIAMETER 3" STAF 193,500.00 193,500.00 193,500.00 193,500.00 193,500.00
122 PIPA PVC AW DIAMETER 4" STAF 310,800.00 310,800.00 310,800.00 310,800.00 310,800.00
123 PIPA PVC AW DIAMETER 6" STAF 410,500.00 410,500.00 410,500.00 410,500.00 410,500.00
124 BEND GIP DIA 1/2" 90 DERAJAT BUAH 23,400.00 23,400.00 23,400.00 23,400.00 23,400.00 30,000.00
125 BEND GIP DIA 3/4" 90 DERAJAT BUAH 23,400.00 23400.00 23,400.00 23,400.00 23,400.00
126 BEND GIP DIA 1" 90 DERAJAT BUAH 29,300.00 29,300.00 29,300.00 29,300.00 29,300.00
127 BEND GIP DIA 1.5" 90 DERAJAT BUAH 29,300.00 29,300.00 29,300.00 29,300.00 29,300.00
128 BEND GIP DIA 2" 90 DERAJAT BUAH 35,100.00 35,100.00 35,100.00 35,100.00 35,100.00
129 BEND GIP DIA 3" 90 DERAJAT BUAH 35,100.00 35,100.00 35,100.00 35,100.00 35,100.00
130 CLAMB SADLE GIP 2"- 3/4" BUAH 35,100.00 35,100.00 35,100.00 35,100.00 35,100.00
131 CLAMB SADLE GIP 1.5"- 1/5" BUAH 58,600.00 58,600.00 58,600.00 58,600.00 58,600.00
132 KNEE GIP DIA 1/2" BUAH 7,000.00 7,000.00 7,000.00 7,000.00 7,000.00
133 KNEE GIP DIA 3/4" BUAH 10,500.00 10,500.00 10,500.00 10,500.00 10,500.00
134 KNEE GIP DIA 1" BUAH 11,700.00 11,700.00 11,700.00 11,700.00 11,700.00
135 KNEE GIP DIA 1.5" BUAH 26,300.00 26,300.00 26,300.00 26,300.00 26,300.00 26,000.00
136 KNEE GIP DIA 2" BUAH 41,000.00 41,000.00 41,000.00 41,000.00 41,000.00 19,000.00
137 KNEE GIP DIA 3" BUAH 117,300.00 117,300.00 117,300.00 117,300.00 117,300.00
138 ELBOW GIP 1/2" BUAH 11,700.00 11,700.00 11,700.00 11,700.00 11,700.00 58,000.00
139 ELBOW GIP 3/4" BUAH 14,000.00 14,000.00 14,000.00 14,000.00 14,000.00
140 ELBOW GIP 1" BUAH 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 595,000.00
141 ELBOW GIP 1.5" BUAH 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00
142 ELBOW GIP 2" BUAH 23,400.00 23,400.00 23,400.00 23,400.00 23,400.00
143 ELBOW GIP 3" BUAH 29,300.00 29,300.00 29,300.00 29,300.00 29,300.00
144 STOP KRAN Dia 1" BUAH 23,400.00 23,400.00 23,400.00 23,400.00 23,400.00
145 STOP KRAN Dia 1.5" BUAH 76,200.00 76,200.00 76,200.00 76,200.00 76,200.00
146 STOP KRAN Dia 2" BUAH 93,800.00 93,800.00 93,800.00 93,800.00 93,800.00
147 STOP KRAN Dia 3" BUAH 35,100.00 35,100.00 35,100.00 35,100.00 35,100.00
148 STOP KRAN Dia 4" BUAH 35,100.00 35,100.00 35,100.00 35,100.00 35,100.00
149 WATER MOOR DIA 1/2" BUAH 26,300.00 26,300.00 26,300.00 26,300.00 26,300.00
150 WATER MOOR DIA 3/4" BUAH 29,300.00 29,300.00 29,300.00 29,300.00 29,300.00
151 WATER MOOR DIA 1" BUAH 35,100.00 35,100.00 35,100.00 35,100.00 35,100.00
152 WATER MOOR DIA 1.5" BUAH 70,300.00 70,300.00 70,300.00 70,300.00 70,300.00
153 WATER MOOR DIA 2" BUAH 99,700.00 99,700.00 99,700.00 99,700.00 99,700.00
154 WATER MOOR DIA 3" BUAH 263,900.00 263,900.00 263,900.00 263,900.00 263,900.00
155 CLAMB PVC DIA 3X 3/4" BUAH 11,700.00 11,700.00 11,700.00 11,700.00 11,700.00
156 CLAMB PVC DIA 2X 3/4" BUAH 11,700.00 11,700.00 11,700.00 11,700.00 11,700.00
157 CLAMB PVC DIA 1.5X 3/4" BUAH 11,700.00 11,700.00 11,700.00 11,700.00 11,700.00
158 DOP PIPA PVC DIA 1" BUAH 3,500.00 3,500.00 3,500.00 3,500.00 3,500.00
159 TEE SOCKET PVC 1 X 1" BUAH 5,800.00 5,800.00 5,800.00 5,800.00 5,800.00
160 TEE SOCKET PVC 1.5" X 1.5" BUAH 5,800.00 5,800.00 5,800.00 5,800.00 5,800.00
161 TEE SOCKET PVC 2" X 1.5" BUAH 8,700.00 8,700.00 8,700.00 8,700.00 8,700.00
162 TEE SOCKET PVC 2" X 2" BUAH 8,700.00 8,700.00 8,700.00 8,700.00 8,700.00
163 TEE SOCKET PVC 3" X 3" BUAH 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00
164 TEE SOCKET PVC 4" X 3" BUAH 35,100.00 35,100.00 35,100.00 35,100.00 35,100.00
165 ELBOW PVC DIAMETER 1 " BUAH 5,800.00 5,800.00 5,800.00 5,800.00 5,800.00
166 ELBOW PVC DIAMETER 2" BUAH 8,700.00 8,700.00 8,700.00 8,700.00 8,700.00
167 ELBOW PVC DIAMETER 3/4" BUAH 4,600.00 4,600.00 4,600.00 4,600.00 4,600.00
168 BESI HOLLOW 4 X 4 STAF 198,200.00 198,200.00 198,200.00 198,200.00 198,200.00
169 BESI HOLLOW 4 X 6 STAF 222,800.00 222,800.00 222,800.00 222,800.00 222,800.00
170 BESI HOLLOW 2 X 4 STAF 146,600.00 146,600.00 146,600.00 146,600.00 146,600.00
171 ALUMANIUM KUSEN BATANG - - 0.00 0.00 0.00
172 MINYAK TANAH LITER 5,200.00 5,200.00 5,200.00 5,200.00 5,200.00
173 SOLAR LITER 10,500.00 10,500.00 10,500.00 10,500.00 10,500.00
174 BENSIN/PREMIUM LITER 10,500.00 10,500.00 10,500.00 10,500.00 10,500.00
175 PLASTIK FILTER BUAH 35,100.00 35,100.00 35,100.00 35,100.00 35,100.00
176 PINTU AIR B= 0.8 M, H = 0.80 M BUAH - - 0.00 0.00 0.00
177 PINTU AIR B= 0.5 M, H = 0.50 M BUAH - - 0.00 0.00 0.00
178 AIR KERJA LITER 200.00 200.00 200.00 200.00 200.00
179 PLINT KERAMIK 10 X 10 M1 28,000.00 28,000.00 28,000.00 28,000.00 28,000.00
180 LIST PLAFON PROFIL M1 100,000.00 100,000.00 100,000.00 100,000.00 100,000.00
181 LEM KAYU M2 160,000.00 160,000.00 160,000.00 160,000.00 160,000.00
182 BESSI STRIP M' 95,000.00 95,000.00 95,000.00 95,000.00 95,000.00
183 KUNCI TANAM 2 SLAAG BH 250,000.00 250,000.00 250,000.00 250,000.00 250,000.00
184 KUNCI TANAM KAMAR MANDI BH 70,000.00 70,000.00 70,000.00 70,000.00 70,000.00
185 CAT MANIE KG 30,000.00 30,000.00 30,000.00 30,000.00 30,000.00
186 PLAMIR KG 46,500.00 46,500.00 46,500.00 46,500.00 46,500.00
187 CAT DASAR KAYU KG 57,500.00 57,500.00 57,500.00 57,500.00 57,500.00
188 CAT PENUTUP KAYU KG 79,000.00 79,000.00 79,000.00 79,000.00 79,000.00
189 KUAS BH 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00
190 PENGENCER KG 46,900.00 46,900.00 46,900.00 46,900.00 46,900.00
191 AMPLAS KG 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00
192 CAT DASAR TEMBOK KG 150,000.00 150,000.00 150,000.00 150,000.00 150,000.00
193 CAT PENUTUP TEMBOK KG 150,000.00 150,000.00 150,000.00 150,000.00 150,000.00
194 URINOIR LOKAL PUTIH BH 900,000.00 900,000.00 900,000.00 900,000.00 900,000.00
195 WASTAVEL BH 1,225,000.00 1,225,000.00 1,225,000.00 1,225,000.00 1,225,000.00
196 FLOOR DRAIN BESSI BH 175,000.00 175,000.00 175,000.00 175,000.00 175,000.00
197 GYPSUM BORD LBR 87,000.00 87,000.00 87,000.00 87,000.00 87,000.00
198 SEKRUP GYPSUM BORD DOS 85,000.00 85,000.00 85,000.00 85,000.00 85,000.00
199 SEAL TAPE BH 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00
200 KABEL NYM 3 X 2.5 M 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00
201 PIPA LISTRIK M 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00
202 SOCKET PIPA BH 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00
203 T DOS BH 6,500.00 6,500.00 6,500.00 6,500.00 6,500.00
204 KLEM PIPA BH 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00
205 LAS DOP BH 22,000.00 22,000.00 22,000.00 22,000.00 22,000.00
206 MCB 35 AMPER BH 325,000.00 325,000.00 325,000.00 325,000.00 325,000.00
207 L BOW BH 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00
208 MONGKOK LISTRIK BH 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00
209 GENTENG METAL BH 77,500.00 77,500.00 77,500.00 77,500.00 77,500.00
210 BUMBUNGAN GENTENG M' 57,000.00 57,000.00 57,000.00 57,000.00 57,000.00
211 BAJA CANAL 75/100 175,000.00 175000 175,000.00 175,000.00 175,000.00
212 PAKU GENTENG KG 30,000.00 30,000.00 30,000.00 30,000.00 30,000.00
213 SEKRUP RENG BH 3,000.00 3,000.00 3,000.00 3,000.00 3,000.00
214 RENG M 55,000.00 55,000.00 55,000.00 55,000.00 55,000.00
215 DINABOLT BH 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00
216 TALANG JURAI DALAM BH 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00
BERAT BESI BETON DALAM KG/M3

Dimensi Luas Panjang Tulangan Pokok Tulangan Beugel Berat Besi Beton (kg/m3) = 7,850.00
Penampang Penampang Penampang Diameter Besi Luas Besi Banyak Panjang Besi Diameter Besi Luas Besi Jarak Banyak Panjang Besi Brt. Besi Pokok Brt. Besi Begel Berat Total
Uraian
(cm) (m2) m3 beton (mm) (m2) (btg) (m) (mm) (m2) Beugel (bh) (m) (kg/m3) (kg/m3) (kg/m3)
(2) x (3) 1/(4) (7) x (5) (cm) (5)/Jarak (10) x pj. Beugel (6)x(8)x7850 (9)x(11)x7850 (12) + (13)
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14)

Sloof 15/20 15.00 20.00 0.0300 33.33 12.00 0.0001130 4.00 133.43 8.00 0.0000502 15.00 222.22 148.89 118.40 58.72 177.12
Kolom 20/20 20.00 20.00 0.0400 25.00 12.00 0.0001130 4.00 100.10 8.00 0.0000502 15.00 166.67 118.33 88.83 46.67 135.49
Balok 15/20 15.00 20.00 0.0300 33.33 12.00 0.0001130 4.00 133.43 8.00 0.0000502 15.00 222.22 148.89 118.40 58.72 177.12
Balok 30/60 60.00 30.00 0.1800 5.56 16.00 0.0002010 4.00 22.32 8.00 0.0000502 15.00 37.04 65.56 35.21 25.85 61.07
Balok 15/15 15.00 15.00 0.0225 44.44 12.00 0.0001130 4.00 177.88 8.00 0.0000502 15.00 296.30 168.89 157.84 66.61 224.45
Balok 20/25 15.00 15.00 0.0225 44.44 12.00 0.0001130 4.00 177.88 8.00 0.0000502 15.00 296.30 168.89 157.84 66.61 224.45
Kolom 15/20 15.00 20.00 0.0300 33.33 12.00 0.0001130 4.00 133.43 8.00 0.0000502 15.00 222.22 148.89 118.40 58.72 177.12
Pelat Pondasi - X 30 cm 100.00 100.00 1.0000 1.00 16.00 0.0002010 5.00 5.10 16.00 0.0002010 5.00 19.55 8.05 30.84 38.89
Pelat Pondasi - Y 30 cm 100.00 100.00 1.0000 1.00 16.00 0.0002010 5.00 5.10 16.00 0.0002010 5.00 19.55 8.05 30.84 38.89
77.77
RAPP KEBUTUHAN BAHAN
REHABILITASI 6 RUANG

NO SAT ANALISA VOL

A
1 BATU BATA m2 840.22
Bh 67217.6
2 PLESTER 1:2 m2 167.12
3 PLESTER 1:4 m2 1456.26
4 ACIAN m2 3006.58

5 SEMEN PORTLAND untuk pas.bata kg 11.5 9662.53


zak 193.2506
6 SEMEN PORTLAND untuk plester 1:2 kg 10.224 1708.63488
zak 34.1726976
7 SEMEN PORTLAND untuk plester 1:4 kg 6.24 9087.0624
zak 181.741248
8 SEMEN PORTLAND untuk acian kg 3.25 9771.385
zak 195.4277

jumlah 604.592246

9 PASIR untuk pasang bata M3 0.043 36.12946


10 PASIR untuk plester 1:2 M3 0.02 3.3424
11 PASIR untuk plester 1:4 M3 0.024 34.95024
jumlah 74.4221

A. 1 PASIR URUG

A.1.1 Pasir urug untuk pek. Pagar sekolah M3 1.2 18.9 22.68

A.1.2 Pasir urug untuk pek. Menara air M3 1.2 0.2 0.24

B
1 Batu kali M3 1.2 253.58 304.296
2 Batu kosong/aanstamping M3 1.2 56.7 68.04
3 PASIR untuk pasang batu kali M3 0.52 131.8616
4 PASIR untuk pasang batu kosong M3 0.432 24.4944

5 SEMEN PORTLAND untuk pasang batu kal kg 163 41333.54


zak

C
1 BATU ALAM M2 1.1 131.87 145.057

2 PASIR untuk pasang batu Alam M3 0.035 4.61545

3 SEMEN PORTLAND untuk pasang batu A kg 11.75 1549.4725


zak

D
1 KERAMIK GRANIT 60X60 M2 6.63 397.8 2637.414

2 PASIR untuk pasang Keramik m3 0.045

3 SEMEN PORTLAND untuk pasang Kerami kg 9.8 3898.44


zak
4 SEMEN WARNA untuk pasang Keramik kg 1.3 517.14
zak

5 Plint untuk pasang Keramik M' 2.65 92.12 244.118

6 PASIR untuk pasang plint Keramik m3 0.003

7 SEMEN PORTLAND untuk pasang plint Ke kg 1.14 105.0168


zak
8 SEMEN WARNA untuk pasang plint Kera kg 0.1 9.212
zak

E
1 KERAMIK anti slip 20x20 M2 26.5 4.5 119.25

2 PASIR untuk pasang Keramik m3 0.045

3 SEMEN PORTLAND untuk pasang Kerami kg 10.4 46.8


zak
4 SEMEN WARNA untuk pasang Keramik kg 1.62 7.29
zak
F PEKERJAAN BETON

A. PAGAR SEKOLAH
1 Plat Beton Camp. 123 (164.57 Kg/M3) m3 1.67

a SEMEN PORTLAND untuk cor beton kg 326 544.42

b Pasir untuk cor beton kg 760 1269.2

c kerikil untuk cor beton kg 1029 1718.43

2 Sloof Beton 15/20 Camp. 123 (177.12 K m3 16.2

a SEMEN PORTLAND untuk cor beton kg 326 5281.2

b Pasir untuk cor beton kg 760 12312

c kerikil untuk cor beton kg 1029 16669.8

3 Kolom Beton 20/20 Camp. 123 ( 135.45 m3 32.92

a SEMEN PORTLAND untuk cor beton kg 230 7571.6

b Pasir untuk cor beton kg 893 29397.56

c kerikil untuk cor beton kg 1027 33808.84

4 Ring Balok Beton 15/20 Camp. 123 (177 m3 16.2

a SEMEN PORTLAND untuk cor beton kg 326 5281.2

b Pasir untuk cor beton kg 760 12312

c kerikil untuk cor beton kg 1029 16669.8

B MENARA AIR
1 Rabat Beton ad. 1 3 5 t = 8 cm m3 0.88

a SEMEN PORTLAND untuk cor beton kg 247 217.36


b Pasir untuk cor beton kg 869 764.72

c kerikil untuk cor beton kg 999 879.12

2 Pondasi Flor Plat Camp 123 (210.97 Kg/ m3 0.8

a SEMEN PORTLAND untuk cor beton kg 352 281.6

b Pasir untuk cor beton kg 731 584.8

c kerikil untuk cor beton kg 1031 824.8

3 Sloof Beton 20/25 Camp 123 (172.11 Kg m3 0.75

a SEMEN PORTLAND untuk cor beton kg 326 244.5

b Pasir untuk cor beton kg 760 570

c kerikil untuk cor beton kg 1029 771.75

4 Plat Lantai Beton t = 12 Cm Camp. 123 ( m3 1.5

a SEMEN PORTLAND untuk cor beton kg 230 345

b Pasir untuk cor beton kg 893 1339.5

c kerikil untuk cor beton kg 1027 1540.5

5 Plat Dak T = 10 Cm camp. 123 ( 164.57 m3 1.25

a SEMEN PORTLAND untuk cor beton kg 326 407.5

b Pasir untuk cor beton kg 760 950

c kerikil untuk cor beton kg 1029 1286.25

6 Kolom Beton 20/20 Camp. 123 ( 135.49 m3 0.96

a SEMEN PORTLAND untuk cor beton kg 326 312.96


b Pasir untuk cor beton kg 760 729.6

c kerikil untuk cor beton kg 1029 987.84

7 Balok Beton 20/25 Camp. 123 (172.11 K m3 0.75

a SEMEN PORTLAND untuk cor beton kg 326 244.5

b Pasir untuk cor beton kg 760 570

c kerikil untuk cor beton kg 1029 771.75

7 Ring Balok Beton 20/25 Camp. 123 (172 m3 0.75

a SEMEN PORTLAND untuk cor beton kg 326 244.5

b Pasir untuk cor beton kg 760 570

c kerikil untuk cor beton kg 1029 771.75

C SALURAN KELILING

1 Rabat Beton ad. 1 3 5 t = 5 cm m3 2.79

a SEMEN PORTLAND untuk cor beton kg 247 689.13

b Pasir untuk cor beton kg 869 2424.51

c kerikil untuk cor beton kg 999 2787.21

D LAPANGAN UPACARA

1 Rabat Beton ad. 1 3 5 t = 5 cm m3 189

a SEMEN PORTLAND untuk cor beton kg 247 46683

b Pasir untuk cor beton kg 869 164241

c kerikil untuk cor beton kg 999 188811


E GASEBO
1 Rabat Beton ad. 1 3 5 t = 8 cm m3 3.15

a SEMEN PORTLAND untuk cor beton kg 230 724.5

b Pasir untuk cor beton kg 893 2812.95

c kerikil untuk cor beton kg 1027 3235.05

2 Pondasi Flor Plat Camp 123 (210.97 Kg/ m3 0.19

a SEMEN PORTLAND untuk cor beton kg 352 66.88

b Pasir untuk cor beton kg 731 138.89

c kerikil untuk cor beton kg 1031 195.89

3 Plat Beton Camp. 123 (164.57 Kg/M3) m3 0.83

a SEMEN PORTLAND untuk cor beton kg 326 270.58

b Pasir untuk cor beton kg 760 630.8

c kerikil untuk cor beton kg 1029 854.07

4 Kolom Beton 10/10 Camp. 123 (319.51 m3 0.15

a SEMEN PORTLAND untuk cor beton kg 384 57.6

b Pasir untuk cor beton kg 692 103.8

c kerikil untuk cor beton kg 1039 155.85

F PEKERJAAN PLAFOND GYPSUM

1 PLAFOND GYPSUM m2 0.364 868.8 316.2432

2 LIST PLAFOND GYPSUM m' 348.72


3 PAKU SEKERUP UNTUK PEMASANGAN PL Kg 0.11 316.2432

G PEKERJAAN PENGECATAN

1 PENGECATAN DINDING LAMA m2 1575.2

a CAT DASAR TEMBOK Kg 0.12

b CAT PENUTUP TEMBOK Kg 0.18

2 PENGECATAN DINDING BARU m2 1383.2

a PLAMUUR Kg 0.1

b CAT DASAR TEMBOK Kg 0.1

c CAT PENUTUP TEMBOK Kg 0.26

3 PENGECATAN PLAFOND m2 868.8

a CAT DASAR TEMBOK Kg 0.1

b CAT PENUTUP TEMBOK Kg 0.26

H PEKERJAAN KUSEN PINTU JENDELA DAN VENTILASI

1 KUSEN KAYU KLS I m3 3.01

a BALOK KAYU m3 1.1

b PAKU BIASA Kg 1.25

c LEM KAYU/ KARET Kg 1

2 DAUN JENDELA KAYU KLS I m3 1.74

a KAYU PAPAN m3 0.064

b PAKU BIASA Kg 1.25


c LEM KAYU/ KARET Kg 0.5

3 DAUN PINTU PANEL m3 1.08

a KAYU PAPAN m3 0.064

b PAKU BIASA Kg 1.25

c LEM KAYU/ KARET Kg 0.5

4 DAUN VENTILASI KAYU KLS I m3 1.00

a KAYU PAPAN m3 0.064

b PAKU BIASA Kg 1.25

c LEM KAYU/ KARET Kg 0.5

I PEKERJAAN ATAP

1 ATAP SENG BJLS 0,25 1098.43


SENG BJLS 0,25 m2 0.7 1098.43
paku biasa Kg 0.02

2 RANGKA KUDA-KUDA KAYU KLS I 13.16


kayu balok m3 1.2 13.16
besi strip Kg 15
paku biasa Kg 5.6

3 GORDING KAYU KLS II 5.49


kayu balok m3 1.1 5.49
besi strip Kg 15
paku biasa Kg 3

4 BUBUNGAN ATAP SENG LICIN 0,25 103.26


plat seng m' 0.3 103.26
paku biasa Kg 0.04

5 PAPAN LISPLANK m' 341.92


kayu papan m3 0.011 341.92
paku biasa Kg 0.05
J PEKERJAAN PEMBESIAN BETON

1 Sloof Beton 15/20 Camp. 123 (177.12 K m3 177.12 16.2

2 Kolom Beton 20/20 Camp. 123 ( 135.45 m3 135.49 32.92

3 Ring Balok Beton 15/20 Camp. 123 (177 m3 224.45 16.2

4 Pondasi Flor Plat Camp 123 (210.97 Kg/ m3 77.77 0.8

5 Sloof Beton 20/25 Camp 123 (172.11 Kg m3 224.45 0.75

6 Plat Lantai Beton t = 12 Cm Camp. 123 ( m3 224.45 1.5

7 Plat Dak T = 10 Cm camp. 123 ( 164.57 m3 224.45 1.25

8 Kolom Beton 20/20 Camp. 123 ( 135.49 m3 135.49 0.96

9 Balok Beton 20/25 Camp. 123 (172.11 K m3 177.12 0.75

10 Ring Balok Beton 20/25 Camp. 123 (172 m3 177.12 0.75

11 Pondasi Flor Plat Camp 123 (210.97 Kg/ m3 77.77 0.19

12 Plat Beton Camp. 123 (164.57 Kg/M3) m3 224.45 0.83

13 Kolom Beton 10/10 Camp. 123 (319.51 m3 177.12 0.15

TOTAL

K PEKERJAAN BEGISTING BETON

1 Sloof Beton 15/20 Camp. 123 (177.12 K m3 16.2


a Kayu kelas III m3 0.05 0.729
b Paku 5 - 10 cm Kg 0.30 4.86
c Minyak bekisting Liter 0.10 1.62

2 Kolom Beton 20/20 Camp. 123 ( 135.45 m3 32.92


a Kayu kelas III m3 0.04 1.3168
b Paku 5 - 12 cm Kg 0.40 13.168
c Minyak bekisting Liter 0.20 6.584
d Balok kayu kelas II m3 0.02 0.4938
e Plywood 9 mm Lembar 0.35 11.522
f Dolken kayu Ø 8-10/400 cm batang 2 65.84

4 Pondasi Flor Plat Camp 123 (210.97 Kg/ m3 0.8


a Kayu kelas II m3 0.04 0.032
b Paku 5 - 10 cm Kg 0.30 0.24
c Minyak bekisting Liter 0.10 0.08

5 Sloof Beton 20/25 Camp 123 (172.11 Kg m3 0.75


a Kayu kelas III m3 0.05 0.03375
b Paku 5 - 10 cm Kg 0.30 0.225
c Minyak bekisting Liter 0.10 0.075

6 Plat Lantai Beton t = 12 Cm Camp. 123 ( m3 1.5


a Kayu kelas III m3 0.04 0.06
b Paku 5 - 12 cm Kg 0.40 0.6
c Minyak bekisting Liter 0.02 0.0225
d Balok kayu kelas II m3 0.02 0.0225
e Plywood 9 mm Lembar 0.35 0.525
f Dolken kayu Ø 8-10/400 cm batang 6.00 9

7 Plat Dak T = 10 Cm camp. 123 ( 164.57 m3 1.25


a Kayu kelas III m3 0.04 0.05
b Paku 5 - 12 cm Kg 0.40 0.5
c Minyak bekisting Liter 0.02 0.01875
d Balok kayu kelas II m3 0.02 0.01875
e Plywood 9 mm Lembar 0.35 0.4375
f Dolken kayu Ø 8-10/400 cm batang 6.00 7.5

8 Kolom Beton 20/20 Camp. 123 ( 135.49 m3 0.96


a Kayu kelas III m3 0.04 0.0384
b Paku 5 - 12 cm Kg 0.40 0.384
c Minyak bekisting Liter 0.20 0.192
d Balok kayu kelas II m3 0.02 0.0144
e Plywood 9 mm Lembar 0.35 0.336
f Dolken kayu Ø 8-10/400 cm batang 2 1.92

9 Balok Beton 20/25 Camp. 123 (172.11 K m3 0.75


a Kayu kelas III m3 0.04 0.03
b Paku 5 - 12 cm Kg 0.40 0.3
c Minyak bekisting Liter 0.20 0.15
d Balok kayu kelas II m3 0.02 0.0135
e Plywood 9 mm Lembar 0.35 0.2625
f Dolken kayu Ø 8-10/400 cm batang 2 1.5

10 Ring Balok Beton 20/25 Camp. 123 (172 m3 0.75


a Kayu kelas III m3 0.04 0.03
b Paku 5 - 12 cm Kg 0.40 0.3
c Minyak bekisting Liter 0.20 0.15
d Balok kayu kelas II m3 0.02 0.0135
e Plywood 9 mm Lembar 0.35 0.2625
f Dolken kayu Ø 8-10/400 cm batang 2.00 1.5

11 Pondasi Flor Plat Camp 123 (210.97 Kg/ m3 0.19


a Kayu kelas III m3 0.04 0.0076
b Paku 5 - 10 cm Kg 0.30 0.057
c Minyak bekisting Liter 0.10 0.019

12 Plat Beton Camp. 123 (164.57 Kg/M3) m3 0.83


a Kayu kelas III m3 0.04 0.0332
b Paku 5 - 12 cm Kg 0.40 0.332
c Minyak bekisting Liter 0.02 0.01245
d Balok kayu kelas II m3 0.02 0.01245
e Plywood 9 mm Lembar 0.35 0.2905
f Dolken kayu Ø 8-10/400 cm batang 6.00 4.98

13 Kolom Beton 10/10 Camp. 123 (319.51 m3 0.15


a Kayu kelas III m3 0.04 0.006
b Paku 5 - 12 cm Kg 0.40 0.06
c Minyak bekisting Liter 0.20 0.03
d Balok kayu kelas II m3 0.02 0.00225
e Plywood 9 mm Lembar 0.35 0.0525
f Dolken kayu Ø 8-10/400 cm batang 2 0.3

jumlah:
a Balok Kayu kelas II m3 0.62315
b Kayu kelas III m3 2.33475
c Paku 5 - 12 cm Kg 21.026
d Minyak bekisting Liter 8.9537
e Plywood 9 mm Lembar 13.6885
f Dolken kayu Ø 8-10/400 cm batang 92.54

KACA BENING/ POLOS m2 30.42


zak

m3

m3

m3
372.336 m3

156.356 m3

826.6708 zak

m2

m3

30.98945 zak

bh
949.735 kotak
17.901 m3

77.9688 zak
kg

bh

0.27636 m3

2.100336 zak
kg

bh

0.2025 m3

0.936 zak
kg
kg
10.8884 zak
kg
0.906571 m3
kg
0.954683 m3

105.624 zak

8.794286 m3

9.261 m3

151.432 zak

20.99826 m3

18.78269 m3

105.624 zak

8.794286 m3

9.261 m3
4.3472 zak

0.546229 m3

0.4884 m3

5.632 zak

0.417714 m3

0.458222 m3

4.89 zak

0.407143 m3

0.42875 m3

6.9 zak

0.956786 m3

0.855833 m3

8.15 zak

0.678571 m3

0.714583 m3
6.2592 zak

0.521143 m3

0.5488 m3

4.89 zak

0.407143 m3

0.42875 m3

4.89 zak

0.407143 m3

0.42875 m3

13.7826 zak

1.731793 m3

1.54845 m3

50
933.66 zak
1400
117.315 m3
1800
104.895 m3

50
14.49 zak
1400
2.00925 m3
1800
1.79725 m3

50
1.3376 zak
1400
0.099207 m3
1800
0.108828 m3

50
5.4116 zak
1400
0.450571 m3
1800
0.474483 m3

50
1.152 zak
1400
0.074143 m3
1800
0.086583 m3

2.88 Luas gypsum per lembar


109.8067 Lembar

348.72 m'
34.78675 Kg

189.024 Kg

283.536 Kg

138.32 Kg

138.32 Kg

359.632 Kg

86.88 Kg

225.888 Kg

3.311 m3

3.7625 Kg

3.01 Kg

0.11136 m3

2.175 Kg
0.87 Kg

0.06912 m3

1.35 Kg

0.54 Kg

0.064 m3

1.25 Kg

0.5 Kg

768.901 m2
21.9686 Kg

15.792 m3
197.4 Kg
73.696 Kg

6.039 m3
82.35 Kg
16.47 Kg

30.978 m'
4.1304 Kg

3.76112 m3
17.096 Kg
2869.398 Kg

4460.46 Kg

3636.08 Kg

62.21802 Kg

168.3371 Kg

336.6741 Kg

280.5618 Kg

130.0742 Kg

132.8425 Kg

132.8425 Kg

14.77678 Kg

186.293 Kg

26.5685 Kg

12437.13 Kg

m3
Kg
Liter

m3
Kg
Liter
m3
Lembar
batang

m3
Lembar
batang

m3
Lembar
batang

m3
Kg
Liter
m3
Lembar
batang

m3
Kg
Liter
m3
Lembar
batang

m3
Kg
Liter
m3
Lembar
batang

m3
Kg
Liter
m3
Lembar
batang
m3
Kg
Liter
m3
Lembar
batang

m3
Kg
Liter

m3
Kg
Liter
m3
Lembar
batang

m3
Kg
Liter
m3
Lembar
batang
JADWAL WAKTU PELAKSANAAN
SD INPRES NAMAA

KEGIATAN : REHABILITASI DAN RENOVASI SARANA PRASARANA SEKOLAH

PEKERJAAN : REHABILITASI DAN RENOVASI SARANA PRASARANA SEKOLAH SD INPRES NAMAA


Lokasi : SD INPRES NAMAA
Tahun Anggaran : 2019

NO JUMLAH HARGA
Bobot I II III IV Ket
Kontrak SEPTEMBER OKTOBER NOVEMBER DESEMBER
(%) 02 S/D 08 09 S/D 15 16 S/D 22 23 S/D 29 30 S/D 06 07 S/D 13 14 S/D 20 21 S/D 27 28 S/D 03 04 S/D 10 11 S/D 17 18 S/D 24 25 S/D 01 02 S/D 08 09 S/D 15 16 S/D 22 23 S/D 31

100 %
I PEKERJAAN PEMBONGKARAN
1 PEKERJAAN PEMBONGKARAN ### 0.129 0.129
2 PEKERJAAN PASANGAN DAN PLESTERAN ### 0.000 - -
3 PEKERJAAN KERAMIK ### 0.243 0.081 0.081 0.081
4 PEKERJAAN KUSEN PINTU DAN JENDELA VENTILASI ### 1.170 0.585 0.585
5 PEKERJAAN PLAFOND ### 1.923 0.641 0.641 0.641
6 PEKERJAAN INSTALASI LISTRIK ### 0.298 0.149 0.149
7 PEKERJAAN PENGECATAN ### 2.746 1.373 1.373
8 PEKERJAAN PENGGANTUNG ### 0.730 0.243 0.243 0.243
9 PEKERJAAN ATAP ### 6.737 2.246 2.246 2.246
II REHABILITASI RUANG KEPSEK + RUANG GURU
PEKERJAAN PEMBONGKARAN ### 0.165 0.165
PEKERJAAN PASANGAN DAN PLESTERAN ### 1.387 0.693 0.693
PEKERJAAN KERAMIK ### 3.799 1.899 1.899 80 %
PEKERJAAN KUSEN PINTU DAN JENDELA VENTILASI ### 0.493 0.246 0.246
PEKERJAAN PLAFOND ### 0.867 0.434 0.434
PEKERJAAN INSTALASI LISTRIK ### 0.497 0.249 0.249
PEKERJAAN PENGECATAN ### 0.924 0.462 0.462
PEKERJAAN PENGGANTUNG ### 0.428 0.214 0.214
PEKERJAAN ATAP ### 2.815 1.407 1.407
III REHABILITASI PERPUSTAKAAN + 1 RUANG KELAS
PEKERJAAN PEMBONGKARAN ### 0.165 0.165
PEKERJAAN PASANGAN DAN PLESTERAN ### 1.460 0.730 0.730
PEKERJAAN KERAMIK ### 3.799 1.899 1.899
PEKERJAAN KUSEN PINTU DAN JENDELA VENTILASI ### 0.259 0.130 0.130
PEKERJAAN PLAFOND ### 0.761 0.761
PEKERJAAN INSTALASI LISTRIK ### 0.646 0.323 0.323
PEKERJAAN PENGECATAN ### 1.289 0.644 0.644
60 %
PEKERJAAN PENGGANTUNG ### 0.281 0.141 0.141
PEKERJAAN ATAP ### 2.815 1.407 1.407
IV REHABILITASI TOILET SEKOLAH
PEKERJAAN PEMBONGKARAN ### 0.129 0.129
PEKERJAAN KERAMIK ### 0.039 0.039
PEKERJAAN PLAFOND ### 0.062 0.062
PEKERJAAN INSTALASI LISTRIK ### 0.298 0.298
PEKERJAAN PENGECATAN ### 0.153 0.153
V PAGAR SEKOLAH
PEKERJAAN AWAL/PERSIAPAN ### 0.092 0.092
PEKERJAAN TANAH ### 1.641 1.641
PEKERJAAN PASANGAN DAN PLESTERAN ### 20.939 4.188 4.188 4.188 4.188 4.188
PEKERJAAN BETON ### 12.727 4.242 4.242 4.242
PEKERJAAN PENGECATAN ### 5.480 2.740 2.740
VI MENARA AIR 40 %
PEKERJAAN AWAL/PERSIAPAN ### 0.055 0.055
PEKERJAAN TANAH ### 0.068 0.068
PEKERJAAN BETON ### 1.433 0.717 0.717
SANITAIR ### 0.277 0.277
VII SALURAN KELILING
PEKERJAAN AWAL/PERSIAPAN ### 0.037 0.037
PEKERJAAN TANAH ### 0.225 0.225
PEKERJAAN BETON ### 0.143 0.143
PEKERJAAN PASANGAN DAN PLESTERAN ### 5.496 2.748 2.748
VIII TAMAN
PEKERJAAN AWAL/PERSIAPAN ### 0.037 0.037
PEKERJAAN TANAH ### 0.071 0.071
PEKERJAAN PASANGAN DAN PLESTERAN ### 0.601 0.601
Pas. Pohon Bunga Pucuk Merah T = 1M ### 0.203 0.203 20 %
Tanam Rumput Hias ### 0.387 0.387
IX LAPANGAN UPACARA
Rabat Beton ad. 1 3 5 t = 10 cm ### 9.654 4.827 4.827
X GASEBO
PEKERJAAN PENGUKURAN DAN BOUWPLANK ### 0.037 0.037
PEKERJAAN TANAH ### 0.034 0.034
PEKERJAAN PASANGAN DAN PLESTERAN ### 0.153 0.153
PEKERJAAN BETON ### 0.386 0.193 0.193
PEKERJAAN KERAMIK ### 0.090 0.090
PEKERJAAN ATAP ### 0.453 0.227 0.227
Anti Rayap ### 0.367 0.367
XI PEKERJAAN AKHIR ### 0.294 0.147 0.147
XII PEKERJAAN PENGADAAN K3 ### 1.112 1.112

0%

- Bobot Pekerjaan Total (%) Kontrak ### 100


- Bobot Rencana Pekerjaan Mingguan (%) Kontrak - - 1.571 1.515 5.605 9.540 12.447 15.192 19.321 13.736 10.882 6.115 2.591 0.601 0.203 0.534 0.147

- Bobot Rencana Pekerjaan Kumulatif (%) Kontrak - - - 1.571 3.086 8.691 18.232 30.678 45.871 65.192 78.927 89.809 95.924 98.515 99.116 99.319 99.853 100.000

- Realisasi Bobot Mingguan Kontrak -


- Komulatif Realisasi Bobot Mingguan Kontrak - -

- Deviasi Kontrak -

Anda mungkin juga menyukai