Anda di halaman 1dari 49

RENCANA ANGGARAN PENDAPATAN DAN BELANJA SEKOLAH (RAPBS)

CATURWULAN I TAHUN ANGGARAN 2020


Nama Sekolah : SDN 3 TEGALSARI
Desa/Kecamatan : TEGALSARI/GADINGREJO
Kabupaten : PRINGSEWU
Provinsi : LAMPUNG

PENERIMAAN PENERIM
NO No Uraian Jumlah NO No
Urut Kode Urut Kode
1 2 3 4 5 6
I 1 SISA TAHUN LALU I 1
1.1
II 2 PENDAPATAN RUTIN 1.2
2.1 Gaji PNS 1.3
2.2 Gaji pegawai tidak tetap 1.4
2.3 Belanja barang dan jasa 1.5
2.4 Belanja pemeliharaan 1.6
2.5 Belanja lain-lain 1.7
1.8
III 3 BANTUAN OPERASIONAL SEKOLAH (BOS)
3.1 BOS Pusat 31,860,000
3.2 BOS Provinsi
3.3 Bos Kabupaten/Kota

IV 4 BANTUAN
4.1 Dana dekonsentrasi
4.2 Dana tugas pembantuan
4.3 Dana alokasi khusus
4.4 Lain-lain (bantuan luar negeri/hibah)

V 5 SUMBER PENDAPATAN LAINNYA


5.1
5.2
Jumlah Penerimaan 31,860,000 Jumlah Pengeluaran

Mengetahui Menyetujui
Komite Sekolah Kepala Sekolah,

AGUS SAPTO NUGROHO SUSWATI,S.Pd


NIP. 19650910 198603 2006
AN DAN BELANJA SEKOLAH (RAPBS)
HUN ANGGARAN 2020
Format BOS-K1
Diisi oleh sekolah
Dikirim ke Tim Manajemen BOS Kab/Kota

PENERIMAAN
Uraian Jumlah

7 8
PROGRAM SEKOLAH
Pengembangan kompetensi kelulusan 4,500,000 4,500,000
Pengembangan Standar isi 570,000
Pengembangan Standar proses 6,210,000 6,210,000
Pengembangan pendidik dan tenaga kependidikan 1,585,000
Pengembangan sarana dan prasarana sekolah 2,983,500
Pengembangan Standar Pengelolalaan 3,920,000 3,920,000
Pengembangan Standar Pembiayaan 8,540,000 8,540,000
Pengembangan dan Implementasi sistem Penilaian 3,551,500

Jumlah Pengeluaran 31,860,000

Tegalsari, 06 Januari 2020


Dibuat oleh bendahara

YUNI EKA KHANIFATUZZUHRO, S. Pd.


NIP. 19960624 201902 2006
###
RENCANA KEGIATAN DAN ANGGARAN SEKOLAH (RKAS)
TAHUN ANGGARAN 2020

NAMA SEKOLAH : SD NEGERI 3 TEGALSARI


DESA/KELURAHAN : TEGALSARI
KECAMATAN : GADINGREJO
KABUPATEN / PROVINSI : PRINGSEWU
SUMBER DANA : BOS REGULER 2020

RINCIAN PERHITUNGAN
PROGRAM
No KODE REKENING URAIAN TAHAP
KEGIATAN NSP Volume
I II III
2 4 5

4 1 4 23 PENDAPATAN DANA BOS TA 2020 118

5 2 BELANJA LANGSUNG

5 2 1 BELANJA PEGAWAI

5 2 1 03 BELANJA PEGAWAI BOS

Standar
5 2 1 03 021 Pembiayaan Honorarium Pegawai Honorer/Tidak Tetap (Dana BOS)
Pendidikan

1. Guru Honorer Bulanan :


a Pendidikan S1 (1\ Org x 12 bln) 12 4 4 4
2. Tenaga Administrasi
a Operator Dapodik (1 org x 12 bln) 12 4 4 4
3.
a Pendidikan D2 (1 Org x 12 bln) 0
4.
Pendidikan SMA (1 Org x 12 bln) 0
5 2 1 03 022 Honorarium Kebersihan Kantor Non PNS (Dana BOS)
1.
Penjaga 1 orang x 12 bln
5 2 1 03 023 Honorarium Keamanan Kantor Non PNS (Dana BOS)
a
b Tenaga Kependidikan (TU) (1 org x 12 bln) 12 4 4 4
c Penjaga Sekolah/Operator Aset (1 org x 12 bln) 12 4 4 4
5 2 2 BELANJA BARANG JASA

5 2 2 01 BELANJA BAHAN HABIS PAKAI

Standar
5 2 2 01 022 Pembiayaan Belanja Alat Tulis Kantor (Dana BOS)
Pendidikan
1. ATK Keg. Penyusunan KKM
a. Kertas A4 1 1 1
b. Kertas F4 2 2 1
c. Tinta Printer 1 1
2. ATK Pelaksanaan TKD
a. Kertas A4 1 1 1
b. Kertas F4 1 1 1
3. ATK Pelaksanaan Try Out
a. Kertas A4 1 1 1
b. Kertas F4 1 1 1
c. Pencil 2B 2 2 2
d Penghapus 2B 35 35 25 10
e Rautan 35 12 25 10
3. ATK Penyusunan Pembagian Tugas Guru 0
a. Kertas A4 2 1 1
b. Kertas F4 1 1 1
c. Tinta Printer 1 1
4. ATK Penyusunan Program Tahunan 0
a. Kertas A4 2 2
b. Kertas F4 2 2
c. Tinta Printer 1 1
5. ATK Penyusunan Program Semester 0
a. Kertas F4 1 1
b. Tinta Printer 1 1
6. ATK Penyusunan Silabus 0
a. Kertas A4 1 1
b. Kertas F4 1 1
c. Tinta Printer 1 1
7. ATK Penyusunan RPP 0
a. Kertas F4 10 10
b. Tinta Printer 2 2
8. ATK Penyusunan Program Ekstrakurikuler 0
c.
Konsum
si
remidial
a. Kertas A4 1 1 1
9 Mata
Pelajara
c.
Pengga
ndaan b. Kertas F4 1 1 1
berkas
remidial
c. Tinta Printer 1
9. ATK Pelaksanaan Pendaftaran Peserta Didik Baru ( 0
a. Kertas Spectra 1 1
b. Kertas F4 1 1
c. Tinta Printer 1 1
10. ATK Penyusunan Program RKAS 0
a. Kertas A4 1 1
b. Kertas F4 1 2
c. Tinta Printer 1 1
11. ATK Pengelolaan Inentaris Barang 0
a. Kertas A4 1 1
b. Kertas F4 1 1
c. Tinta Printer 1 1
12. ATK KBM 0
- Kertas F4 4 1 2 1
- Kertas A4 3 1 1 1
- Tinta Printer 3 1 1 1
- Staples (Isi Hekter) MAX No. 10 2 1 1
- Stapler (Hekter) MAX No. 10 1 1
- Penggaris Plastik 30 cm 1 1
- Ballpoint Pilot BPTP 0
- Ballpoint Faster C600 1 1
- Buku tulis biasa 38 lembar 4 2 2
- Buku Folio 200 LBR 2 1 1
- Tip Ex 3 1 2
- Penghapus Whiteboard kecil 10 2 4 4
- Kertas Origami kecil (uk. 12x12) 1 1
- Kertas Origami besar (uk. 15x15) 1 1
- Spidol Artline 70 Permanent Ink 1 1
- Spidol Whiteboard BG 12 0
- Spidol Witeboard 5 4 1
- Double Tape 1/4" 3 2 1
- Double Tape 2" 0
- Lakban 1" 1 2
- Lakban OPP bening 1 2
- Lakban 2" HITAM 2 3 2
- Paper Klip No.1 1 1
- Paper Klip No.3 1 1
- Paper Klip No.5 1 1
- Binder Klip No. 105 2 1 1
- Binder Klip No. 155 3 1 2
- Map Kertas biasa 6 2 2 2
- Map snell biasa 4 5 3
Gunting Uk. Sedang 2 2
Cutter KENKO L-500 2 2
refill pisau cutter 1 1
Lem Stick 8 Gram 3 5 3 3
Lem FOX putih 150 Gram 1 1
Odner Karton Folio 5 cm (727) 0
13. ATK Penyusunan Laporan BOS
- Kertas F4 3 2 1 1
- Tinta Printer Epson L 220 3 1 1 1
- Kwitansi Besar 3 2 1 1
Standar
5 2 2 01 023 Pembiayaan Belanja alat listrik dan elektronik (lampu pijar, battery kering) (Dana Bos)
Pendidikan
1 Stop Kontak 1 3
2 Kabel 4 4
3 Lampu Neon Philips 6 6
4 Steker Arde Broco 4 4

Standar
5 2 2 01 024 Pembiayaan Belanja Perangko, Materai dan Benda Pos Lainnya (Dana BOS)
Pendidikan
1. Materai 3000 120 40 40 40
2. Materai 6000 60 20 20 20
0
Standar
5 2 2 01 025 Pembiayaan Belanja peralatan kebersihan dan bahan pembersih (Dana Bos)
Pendidikan
1. Sapu Injuk 9 4 1 4
2. Pelan Dragon 8 3 1 4
3. Kemoceng 9 4 1 4
4. Sapu Lidi 7 2 2 3
5. So klin lantai 9 3 3 3
6. Sunlight Cair 12 4 4 4
7. Bak sampah 9 3 3 3
8. So klin lantai 800ml 6 2 2 2
9. Sunlight Cream 9 3 3 3
Standar
5 2 2 01 027 Pembiayaan Belanja Spanduk Baliho, Billboard, Papan Nama/Plang dan Sejenisnya (Dana BOS)
Pendidikan
1. Spanduk Penerimaan Siswa Baru 3 3
2. Spanduk Bebas Pungutan BOS 3 3
3. Spanduk USBN 3 3
4. Papan RKAS 1 1
5. Plang SRA 1 1
6. Papan data realisasi penggunaan dana BOS 1 1
0
5 2 2 01 028 Belanja Plakat/Piala/Tropy/Piagam/Karangan Bunga (Dana BOS)
0
0
Standar Sarana
5 2 2 01 029 Belanja kelengkapan alat-alat olahraga (Dana Bos)
dan Prasarana
1 Pembelian Bola Volly 2 1 1
2 Pembelian Bola Sepak 2 1 1
3 Net Batminton 1 1
4 Bola Pingpong 3 1 2
5 Bet Pingpong 1 1
6 Shuttlecok 2 1 1
7 Raket 2 2
8 Jaring Sepakbola 1 1
9 Matras 4 2 2
0
0
0
0
0
0
5 2 2 01 030 Belanja Alat Kesehatan Habis Pakai (Dana Bos)
0
0
5 2 2 02 BELANJA BAHAN / MATERIAL
0
5 2 2 02 016 Belanja bahan/Material (Dana BOS)
0
Standar Sarana
5 2 2 02 017 Belanja bahan/Bibit Tanaman (Dana BOS)
dan Prasarana
1 Pucuk Merah 6 6
2 Ketapang 6 6
0
0
Standar Sarana
5 2 2 02 018 Belanja bahan obat-obatan (Dana BOS)
dan Prasarana
1. Betadine 6 3 1 2
2. Kapas 4 2 1 1
3. Kain Kassa 4 2 1 1
4. Minyak Kayu Putih Besar 4 2 1 1
5. Obat Sakit Perut 4 2 1 1
6. Obat Turun Panas 5 2 2 1
7. Tolak Angin Cair 6 2 1 3
8. Refanol 5 1 2 2
0
Standar Sarana
5 2 2 02 019 Belanja Bahan dan Alat Pelatihan Keterampilan (Dana BOS)
dan Prasarana
1. Pengadaan Bahan Praktek Keterampilan
a. Batu Batre ABC Besar 5 4 1
b. Bohlam Kecil 5 3 1 1
c. Kertas Plano 0
d. Water Colour 4 2 2
e Koas Lukis 11 11
2. Pengadaan Media Pembelajaran 0
a. Media Original Menggambar 0
3. Pengadaan bahan Kegiatan Pramuka 0
a Tenda Pramuka 2 2
Tambang pramuka 10 10
Bendera Tunas Kelapa 2 2
Bendera Boyscot 2 2
Bendera Semapur 2 2
4. Pengadaan Papan Identitas Ruangan 0
a. Papan Nama Ruangan 1 1
0
0
5 2 2 03 BELANJA JASA KANTOR
0
Standar Proses
5 2 2 03 033 Belanja Pendaftaran Perlombaan (Dana BOS)
Pendidikan
1. Pendaftaran Lomba OSN 1 1
2. Pendaftaran Lomba O2SN 1 1
3. Pendaftaran Lomba FLS2N 1 1
4. Pendaftaran Lomba Guru Berprestasi 0
0
5 2 2 03 034 Belanja Jasa Rekening Telepon (Dana BOS)
0
0
5 2 2 03 035 Belanja Jasa Rekening Air (Dana BOS)
1. Pembayaran PDAM 0
a Pembayaran langganan PDAM 0
Standar
5 2 2 03 036 Pembiayaan Belanja Jasa Rekening Listrik (Dana BOS)
Pendidikan
1. Pembayaran Rekening Listrik 0
a Rekening Listrik 12 4 4 4

5 2 2 03 037 Standar Isi Belanja surat kabar/majalah (Dana BOS)

a. Pembayaran langganan Koran dan Majalah (3 ek 36 12 12 12

Standar
5 2 2 03 038 Pembiayaan Belanja Jasa kawat/faksimili/internet (Dana BOS)
Pendidikan
1. Pembayaran Langganan Internet
a. Paket Internet / speedy Indohome
0
5 2 2 03 039 Belanja Jasa Pengangkutan Sampah (Dana BOS)
0
0
5 2 2 03 040 Belanja Jasa Tenaga Ahli/Instruktur/Narasumber/Penceramah Agama (Dana BOS)
0
0
Standar
5 2 2 03 041 Pembiayaan Belanja Jasa Lainnya (Dana BOS)
Pendidikan
1 Pelaksanaan Lomba OSN 0
a. Transport Peserta Lomba 3 3
b. Transport Pembimbing 2 2
2 Pelaksanaan Lomba O2SN 0
a. Transport Peserta Lomba 4 3
b. Transport Pembimbing 2 2
3 Pelaksanaan Lomba FLS2N Tingk Kecamatan 0
a. Transport Peserta Lomba 2 4
b. Transport Pembimbing 2 2
4 Ongkos Tukang Pemeliharaan ruang Kelas / Belajar dan 0
a. Ongkos Tukang bangunan (1 org x 4 hr) 0
b. Ongkos Kenek (1 org x 4 hr) 0
5 Ongkos Tukang Pemeliharaan Pintu Kelas 0
a. Ongkos Tukang bangunan (1 org x 3 hr) 0

6 Ongkos Tukang Pemeliharaan Kamar Mandi 0


a. Ongkos Tukang bangunan (1 org x 1 hr) 0
b. Ongkos Kenek (1 org x 1 hr) 0
7 Ongkos Tukang Pemeliraan Taman dan Lapangan
a. Ongkos penataan dan penyemprotan halaman se 1 1
b. Ongkos tukang pemeliharaan Taman Lapangan 2 1 1
0
8 Ongkos Tukang Pemeliharaan Perabotan Mebelair
a. Ongkos pemeliharaan mebeler (1 org x 4 hr) 1 1
9 Pelaksanaan USBN 0
a. Transport Pengawas Silang USBN (2 Org x 3 Hr) 0

10 Pelaksanaan Latgab Pramuka tingkat Kwarran


- Transport Pembima pramuka (1org x bln) 1 1

11 Ongkos Tukang Pemeliharaan Perpustakaan


Tukang (1 org x 2 hr) 0
12 Ongkos Tukang Pemasangan Keramik
Tukang (2 org x 2 hr) 0

5 2 2 03 044 Belanja Pendaftaran Seminar/Workshop (Dana BOS)

5 2 2 06 BELANJA CETAK DAN PENGGANDAAN

5 2 2 06 005 Standar Isi Belanja cetak (Dana BOS)


1. Kalender Pendidikan
Sampul Rapor Kurtilas 35 35
Sampul Ijazah 31 31
Standar Kompete
5 2 2 06 006 Belanja Penggandaan (Dana BOS)
nsi Lulusan
1. Penggandaan Soal UTS 180 90 90
2. Penggandaan Soal UAS 150
3. Penggandaan Soal UKK 0
4. Penggandaan Soal Try Out 9 9
5. Penggandaan Soal TKD 12 12
6. Penggandaan Perangkat Administrasi Kelas 6 6 6 6
0
Standar
5 2 2 06 007 Belanja Photocopy (Dana BOS)
Pembiayaan
- Foto Copy penyusunan KKM 127 49 50 28
- Foto Copy Soal ULHAR (6 Kls x 9 MP) 810 270 270 270
- Foto Copy Pembagian Tugas mengajar Guru 120 40 40 40
- Foto Copy Prota 0
- Foto Copy Promes 0
- Foto Copy Silabus 0
- Foto Copy RPP 0
- Foto Copy Kegiatan Ekstrakurikuler 90 30 30 30
- Foto Copy Formulir PPDB 40 40
- Foto Copy Laporan Kedinasan 300 100 100 100
- Foto Copy Daftar 1 150 50 50 50
- Foto Copy Laporan BOS 355 125 130 100
- Foto Copy RKAS 50 100
- Foto Copy Inventaris barang 90 30 30 30
- Foto Copy Laporan PPDB 50 50
- Foto Copy Laporan TKD 50 50
- Foto Copy Laporan Try Out 30 30
- Foto Copy Laporan USBN 110 110
- Foto Copy Laporan UKK 0
- Foto Copy Laporan UTS 50 50
- Foto Copy Laporan UAS 150 150
- 0
- 0
- 0
- 0
- 0
- Foto Copy Kuisioner PMP 300 100 200
0
Standar
5 2 2 06 008 Belanja Penjilidan (Dana BOS)
Pembiayaan
1 Penjilidan Program Tahunan 2 2
2 Penjilidan Program Semester 5 3 2
3 Penjilidan Silabus 8 8
4 Penjilidan RPP 80 80
5 Penjilidan RKAS 2 2
6 Penjilidan Inentaris Barang 1 1
7 Penjilidan Laporan BOS 7 3 2 2
8 Penjilidan KKM 2 2
9 Penjilidan Laporan TKD 6 6
10 Penjilidan Laporan Try Out 2 2
11 Penjilidan Laporan USBN 2 2
12 Penjilidan Laporan UKK 0
13 Penjilidan Laporan UAS 10 10
14 Penjilidan Laporan UTS 20 10 10

5 2 2 08 BELANJA SEWA SARANA MOBILITAS

5 2 2 08 004 Belanja sewa Sarana Mobilitas Darat (Dana BOS)


1 Sewa mobil kegiatan Lomba FLS2N Tk Kabupaten
2 Sewa mobil kegiatan Lomba O2SN Tk kabupaten

5 2 2 11 BELANJA MAKANAN DAN MINUMAN

Standar
5 2 2 11 011 Belanja Makanan dan Minuman Rapat/Kegiatan (Dana BOS)
Pembiayaan
- Makan dan Minum Kegiatan Pelaksanaan USBN 0
- Makan dan Minum KegiatanTKD (2 org x 2 hr) 4 4
- Makan dan Minum Rapat Pembagian Jam Mengajar 36 12 12 12
- Makan dan Minum Rapat penyusunan RKAS 24 24
- Makan dan Minum Rapat Penyusunan RKPAS 24 24
- Makan dan Minum Rapat Dewan Guru 12 24
- Makan dan Minum Kegiatan Penerimaan Siswa baru 12 12
- Makan dan Minum Kegiatan Rapat Orang Tua Tahun Ajaran 30 30
- Makan dan Minum Kegiatan Ulhar 12 12
- Makan dan Minum Kegiatan Penilaian UTS (11 org x 6 hr x 132 66 66
- Makan dan Minum Kegiatan Penilaian UAS (11 org x 6 hr x 66 66
- Makan dan Minum Kegiatan Penilaian UKK (11 org x 6 hr x 0
- Makan dan Minum Kegiatan Remedial 21 9 12
- Makan dan Minum Penilaian Kegiatan USBN 0
- Makan dan Minum Kegiatan Latgab Pramuka 20 20
- Makan dan Minum Kegiatan Ekstrakurikuler olahraga 10 10
- Makan dan Minum Kegiatan Lomba FLS2N 2 2
- Makan dan Minum Kegiatan Lomba OSN 3 3
- Makan dan Minum Kegiatan Lomba O2SN 2 2
- Makan dan Minum Kegiatan Try Out 0
- Makan dan Minum Kegiatan Penyusunan RPP (11 x 5hr x 1 55 55
- Makan dan Minum Kegiatan Penyusunan Silabus (11 x 3hr 55 55
- Makan dan Minum Kegiatan Penyusunan KKM (11 x 1hr x 1 55 55
- Makan dan Minum Kegiatan Updating Data Siswa (1 x 4 hr 4 4
- Makan dan Minum Kegiatan Input PMP (1 org x 6 hr ) 6 6
-

5 2 2 15 BELANJA PERJALANAN DINAS

Standar Pendidik
5 2 2 15 004 dan Tenaga Belanja perjalanan dinas dalam daerah (Dana BOS)
Kependidikan

1 Transport Guru/Tenaga Kependidikan 20 4 8 8


2 Transport Pelatihan 4 2 1 1
3 Transport Rapat KKKS 5 3 1 1
4 Transport Koordinasi Ke Korwil, Dinas dll 10 4 3 3
5 Transport Pengambilan Dana BOS 6 2 2 2
6 Transport Lomba Guru Berprestasi
0
5 2 2 15 005 Belanja perjalanan dinas Luar daerah (Dana BOS)
5 2 2 18 BELANJA PEMELIHARAAN

Standar Sarana
5 2 2 18 007 Belanja Pemeliharan Peralatan dan Mesin (Dana BOS)
dan Prasarana
1. Pemeliharaan Soud System
a Refarasi Sound System
1. Pemeliharaan Printer
a Catridge Canon Colour 2 1 1
Catridge Canon Black 1 1
b Servis Printer Canon IP 2700 2 1
2. Pemeliharaan Peraltan komputer
- Mouse biasa 1 1
- Keyboard 0
- Flashdis 16 GB 1 1
- HDD eksternal 250 GB 1 1
- Power Suply 0
- Charger laptop hp 0
- Instal Ulang Laptop 1 1
- Service / penggantian LCD Laptop HP 0
5 2 2 18 008 Belanja Pemeliharan Aset Tetap Lainnya (Dana BOS) 0
0
0
5 2 2 18 009 Belanja Pemeliharan Aset Tetap Lainnya (Dana BOS)
1. Pemeliharaan Taman Sekolah
- Pembelian Pot dan Bunga 18 6 12
- Obat rumput 2 1 1
2. Pemeliharaan Gedung Perpustakaan 0
1 Cat Besi/Kayu 2 1 1
2 Cet tembok 1 1
3 Pasir Pasang 0
4 Tiner 4 2 2
5 SEMEN / KAPUR Semen Tiga roda Tiga Roda 50 4 2 2
6 Bata 1000 1000
3. 0
0
0
0
0
0

4. Pemeliharaan Ruang kelas / Belajar dan Ruang Guru


- Cat Tembok 2 1 1
- Cat Besi / Kayu 3 1 1 1
- Tiner 2 2
- Kuas Besar 1 1
- Kuas Kecil 3 1 1 1
- Roll 1 1
5. Pemeliharaan Pintu Kelas
a Perbaikan pintu kelas 0
b Kunci 2 2
c Engsel 2 2
0
6. Pemeliharaan Kamar mandi/wc Peserta Didik
1 Paralon 1/2 inc 3 3
2 Lem 2 2
3 L 1/2 1 1
4 T 1/2 3 3
5 Sok Drat 1/2 3 3
6 Kran Air 6 6
7 Kusen 0
8 Daun Pintu 0
9 Kunci 5 3 2
10 Engsel 6 6
11 Grendel 10 4 6
12 Bata Merah 500 500
13 Semen 9 1 3 5
14 Pasir 3 1 2
15 Cat 3 1 1 1
7. Pemeliharaan Lapangan Sekolah 0
a Cat Lapangan 0
b Paving Block 0
c Pasir 1 1
d Tanah Merah 0
e Refarasi Pintu Gerbang 2 5 2

8. Pemeliharaan Lantai Ruang Kelas 0


1 Keramik Lantai 0
2 Semen 9 3 6

9. Pemeliharaan Meubeulair 0
- Papan 3 3
- Sirlak/Pernis 3 3
- Paku 6 2 4
Triplek 2 2
Kaso 1 1

5 2 2 24 BELANJA ALAT-ALAT RUMAH TANGGA

Standar Sarana
5 2 2 24 012 Belanja Alat Rumah Tangga Lainnya (Home Use) (Dana BOS)
dan Prasarana
1. Pengadaan bahan dan Alat RT Sekolah
- Kompor Rinnai RI 522 E satu tungku 1 1
- Dispenser Air Hot and Cold 0
- Gelas 2 1 1
- Sendok garpu 3 1 2
- Mangkok 1 1 1
- Piring 1 1
- Hordeng 20 20
- Taplak Meja 10 3 7
- Pisau 3 1 2
- Galon Air Minum 2 2
- Jam Dinding 1 1

0
0
0
5 2 3 BELANJA MODAL

5 2 3 27 BELANJA MODAL PENGADAAN ALAT KANTOR

Standar Sarana
5 2 3 27 011 Belanja Modal Pengadaan Alat Elektronik (Dana BOS)
dan Prasarana
1. Penambahan Printer
- Printer 1 1
- Kipas Angin 3 3
- Bel Sekolah 0
5 2 3 28 BELANJA MODAL PENGADAAN ALAT RUMAH TANGGA

Standar Sarana
5 2 3 28 010 Belanja modal Pengadaan Meubelair (Dana BOS)
dan Prasarana
1. Penambahan Lemari Piala
a Etalase Pajang 150 x 200 0
2. Penambahan Meja Guru
a. Meja Guru 4 5 2
b Kursi Guru 4 5 2
3. Penambahan Meja Kursi Murid
a. Meja Siswa 10 10
b Kursi Siswa 10 10
0
5 2 3 83 BELANJA MODAL PENGADAAN BUKU

5 2 3 83 013 Belanja modal Pengadaan Buku Agama (Dana BOS)


1 BS Agama Islam Kls 2 0
2 BS Agama Islam Kls 3 0
3 BS Agama Islam Kls 5 0
4 BS Agama Islam Kls 6 0
5 BG Agama Islam Kls 2 0
6 BG Agama Islam Kls 3 0
7 BG Agama Islam Kls 5 0
8 BG Agama Islam Kls 6 0
0
5 2 3 83 016 Belanja modal Pengadaan Buku Matematika & Pengetahuan alam (Dana BOS)
- Matematika kelas 4 (siswa) 0
- Matematika kelas 5 (Siswa) 0
Matematika kelas 6 (Siswa) 0
- Matematika kelas 4 (guru) 0
- Matematika kelas 5 (guru) 0
Matematika kelas 6 (guru) 0
5 2 3 83 018 Belanja modal Pengadaan Buku Arsitektur, Kesenian, Olah raga (Dana BOS)
1 BS PJOK Kls 5 0
2 BS PJOK Kls 6 0
0
5 2 3 83 020 Belanja modal Pengadaan Buku Lainnya (Dana BOS)
1 Pengadaan Buku Pelajaran Pokok Peserta Didik
Buku Siswa Kelas 1
- BS Kls 3 Mengenal Olahraga dan Permainan Tra 20 20
- BS Kls 3 Indahnya Persahabatan 20 20
- BS Kls 3 Energi dan Perubahannya 20 20
- BS Kls 3 Bumi dan Alam Semesta 20 20
- 0
- 0
- 0
- 0
Buku Siswa Kelas 6
- BS Kelas 6 Menuju Masyarakat Sehat 18 18
- BS Kelas 6 Kepemimpinan 18 18
- BS Kelas 6 Bumiku 18 18
- BS Kelas 6 Menjelajah Ruang Angkasa 18 18
Buku Siswa Bahasa Lampung
- BUKU BAHASA LAMPUNG Kelas 1 0
- BUKU BAHASA LAMPUNG Kelas 2 0
- BUKU BAHASA LAMPUNG Kelas 3 0
- BUKU BAHASA LAMPUNG Kelas 4 20 20
- BUKU BAHASA LAMPUNG Kelas 5 20 20
- BUKU BAHASA LAMPUNG Kelas 6 20 20
2 Pengadaan Buku Pegangan Guru
Buku Guru Kelas 3
- BG Kelas 3 Mengenal Olahraga dan Permainan 1 1
- BG Kelas 3 Indahnya Persahabatan 1 1
- BG Kelas 3 Energi dan Perubahannya 1 1
- BG Kelas 3 Bumi dan Alam Semesta 1 1
- 0
- 0
- 0
- 0
Buku Guru Kelas 6
- BG Kls 6 Menuju Masyarakat Sehat 1 1
- BG Kls 6 Kepemimpinan 1 1
- BG Kls 6 Bumiku 2 2
- BG Kls 6 Menjelajah Ruang Angkasa 1 1

Mengetahui Menyetujui,
Ketua Komite Sekolah Kepala Sekolah

AGUS SAPTO NUGROHO S U S W A T I, S. Pd.


NIP. 19650910 198603 2006
SEKOLAH (RKAS)
20

RINCIAN PERHITUNGAN RENCANA PENARIKAN


Tahap I Tahap II Tahap III
Satuan Harga Satuan Jumlah
Jan-Apr Mei-Ags Sep-Des
6 7 8 9 10 11
30% 40% 30%
900,000 106,200,000 31,860,000 42,480,000 31,860,000
- - -
106,200,000 31,860,000 42,480,000 31,860,000

5,400,000 1,800,000 1,800,000 1,800,000

5,400,000 1,800,000 1,800,000 1,800,000

5,400,000 1,800,000 1,800,000 1,800,000

bln 250,000 3,000,000 1,000,000 1,000,000 1,000,000

bln 200,000 2,400,000 800,000 800,000 800,000


- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
bln 150,000 1,800,000 600,000 600,000 600,000
bln 500,000 6,000,000 2,000,000 2,000,000 2,000,000
87,220,000 24,460,000 32,778,300 29,981,700
-
27,963,000 9,564,000 10,024,000 8,375,000
-

10,253,000 5,454,000 3,199,000 1,600,000

496,000 379,000 117,000 -


rim 55,000 55,000 55,000 55,000 -
rim 62,000 124,000 124,000 62,000 -
Paket 200,000 200,000 200,000 - -
234,000 117,000 117,000 -
rim 55,000 55,000 55,000 55,000 -
rim 62,000 62,000 62,000 62,000 -
1,176,000 519,000 537,000 120,000
rim 55,000 55,000 55,000 55,000 -
rim 62,000 62,000 62,000 62,000 -
pak 60,000 120,000 120,000 120,000 -
PCS 6,000 210,000 210,000 150,000 60,000
PCS 6,000 210,000 72,000 150,000 60,000
434,000 317,000 117,000 -
55,000 110,000 55,000 55,000 -
rim 62,000 62,000 62,000 62,000 -
Paket 200,000 200,000 200,000 - -
434,000 434,000
rim 55,000 110,000 110,000 - -
rim 62,000 124,000 124,000 - -
Paket 200,000 200,000 200,000 - -
262,000 262,000 - -
rim 62,000 62,000 62,000 - -
Paket 200,000 200,000 200,000 - -
317,000 317,000 - -
rim 55,000 55,000 55,000 - -
rim 62,000 62,000 62,000 - -
Paket 200,000 200,000 200,000 - -
1,020,000 400,000 620,000 -
rim 62,000 620,000 - 620,000 -
Paket 200,000 400,000 400,000 - -
234,000 117,000 117,000 -

rim 55,000 55,000 55,000 55,000 -


rim 62,000 62,000 62,000 62,000 -

btl 200,000 200,000 - - -


317,000 - 317,000 -
pak 55,000 55,000 - 55,000 -
rim 62,000 62,000 - 62,000 -
Paket 200,000 200,000 - 200,000 -
379,000 379,000 - -
rim 55,000 55,000 55,000 - -
rim 62,000 62,000 124,000 - -
Paket 200,000 200,000 200,000 - -
317,000 317,000 - -
rim 55,000 55,000 55,000 - -
rim 62,000 62,000 62,000 - -
Paket 200,000 200,000 200,000 - -
3,749,000 1,554,000 986,000 1,209,000
rim 62,000 248,000 62,000 124,000 62,000
rim 55,000 165,000 55,000 55,000 55,000
Paket 200,000 600,000 200,000 200,000 200,000
pak 69,000 138,000 69,000 - 69,000
bh 29,000 29,000 29,000 - -
Pak 13,000 13,000 13,000 - -
Pak 50,000 - - - -
pak 249,000 249,000 249,000 - -
pak 38,000 152,000 76,000 - 76,000
bh 58,000 116,000 58,000 - 58,000
Pak 100,000 300,000 100,000 - 200,000
bh 10,000 100,000 20,000 40,000 40,000
bh 13,000 13,000 - 13,000 -
pak 20,000 20,000 - 20,000 -
pak 13,000 13,000 - 13,000 -
15,000 - - - -
PAK 85,000 425,000 - 340,000 85,000
bh 6,000 18,000 12,000 6,000 -
bh 23,000 - - - -
bh 15,000 15,000 30,000 - -
bh 20,000 20,000 40,000 - -
pak 27,000 54,000 - 81,000 54,000
pak 6,000 6,000 - - 6,000
pak 5,000 5,000 - - 5,000
pak 9,000 9,000 - - 9,000
pak 7,000 14,000 7,000 - 7,000
bh 15,000 45,000 15,000 - 30,000
pak 35,000 210,000 70,000 70,000 70,000
pak 53,000 212,000 265,000 - 159,000
21,000 42,000 42,000 - -
pak 35,000 70,000 70,000 - -
11,000 11,000 11,000 - -
8,000 24,000 40,000 24,000 24,000
21,000 21,000 21,000 - -
356,000 - - - -
884,000 342,000 271,000 271,000
rim 62,000 186,000 124,000 62,000 62,000
PCS 200,000 600,000 200,000 200,000 200,000
Expl 9,000 27,000 18,000 9,000 9,000

1,105,000 1,105,000 - -

Buah 35,000 35,000 105,000 - -


Roll 150,000 600,000 600,000 - -
Pieces 50,000 300,000 300,000 - -
Buah 25,000 100,000 100,000 - -

720,000 240,000 240,000 240,000

bh 3,000 360,000 120,000 120,000 120,000


bh 6,000 360,000 120,000 120,000 120,000
- - - -

2,415,000 865,000 575,000 975,000

Buah 15,000 135,000 60,000 15,000 60,000


Buah 100,000 800,000 300,000 100,000 400,000
Buah 15,000 135,000 60,000 15,000 60,000
Buah 10,000 70,000 20,000 20,000 30,000
Buah 30,000 270,000 90,000 90,000 90,000
Buah 25,000 300,000 100,000 100,000 100,000
Buah 50,000 450,000 150,000 150,000 150,000
btl 20,000 120,000 40,000 40,000 40,000
bks 15,000 135,000 45,000 45,000 45,000
- - - -

- - - -
3,300,000 1,900,000 450,000 950,000

mtr 50,000 150,000 - 150,000 -


mtr 50,000 150,000 - 150,000 -
mtr 50,000 150,000 - 150,000 -
bh 950,000 950,000 - - 950,000
bh 950,000 950,000 950,000 - -
bh 950,000 950,000 950,000 - -
- - - -
-
- - - -
- - - -

10,170,000 - 5,560,000 4,610,000

Buah 250,000 500,000 - 250,000 250,000


Buah 300,000 600,000 - 300,000 300,000
Buah 600,000 600,000 - 600,000 -
slop 100,000 300,000 - 100,000 200,000
Buah 50,000 50,000 - 50,000 -
Slop 60,000 120,000 - 60,000 60,000
bh 100,000 200,000 - - 200,000
600,000 600,000 - 600,000 -
1,800,000 7,200,000 3,600,000 3,600,000
bh -
-
-
-
-
-
-
- - - -
- - - -
2,295,000 326,000 1,092,000 877,000
- - - -
-
- - - -

450,000 - - 450,000

bh 30,000 180,000 - - 180,000


bh 45,000 270,000 - - 270,000
- - - -
- - - -

580,000 245,000 140,000 195,000

btl 15,000 90,000 45,000 15,000 30,000


bks 10,000 40,000 20,000 10,000 10,000
bks 10,000 40,000 20,000 10,000 10,000
btl 30,000 120,000 60,000 30,000 30,000
pak 10,000 40,000 20,000 10,000 10,000
pak 10,000 50,000 20,000 20,000 10,000
pak 25,000 150,000 50,000 25,000 75,000
btl 10,000 50,000 10,000 20,000 20,000
- - - -

1,265,000 81,000 952,000 232,000

150,000 56,000 2,000 92,000


bh 5,000 25,000 20,000 - 5,000
bh 2,000 10,000 6,000 2,000 2,000
plno 3,500 - - - -
set 15,000 60,000 30,000 - 30,000
bh 5,000 55,000 - - 55,000
- - - -
- - - -
1,090,000 - 950,000 140,000
bh 450,000 900,000 - 900,000 -
bh 5,000 50,000 - 50,000 -
bh 25,000 50,000 - - 50,000
bh 25,000 50,000 - - 50,000
set 20,000 40,000 - - 40,000
25,000 25,000 - -
bh 25,000 25,000 25,000 - -
- - - -
- - - -
6,550,000 3,150,000 1,550,000 1,850,000
- - - -

1,200,000 1,200,000 - -

Keg 300,000 300,000 300,000 - -


Keg 300,000 300,000 300,000 - -
Keg 600,000 600,000 600,000 - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
-
bln 35,000 - - - -
1,200,000 400,000 400,000 400,000

bln 100,000 1,200,000 400,000 400,000 400,000

2,700,000 900,000 900,000 900,000

eks 75,000 2,700,000 900,000 900,000 900,000


- - - -

- - - -

bln - - - -
- - - -
-
- - - -
- - - -
-
- - - -
- - - -

1,450,000 650,000 250,000 550,000

125,000 125,000 - -
oh 25,000 75,000 75,000 - -
oh 25,000 50,000 50,000 - -
125,000 125,000 - -
oh 25,000 100,000 75,000 - -
oh 25,000 50,000 50,000 - -
150,000 150,000 - -
oh 25,000 50,000 100,000 - -
oh 25,000 50,000 50,000 - -
- - - -
oh 400,000 - - - -
oh 320,000 - - - -
- - - -
oh 300,000 - - - -
- - - -
- - - -
oh 100,000 - - - -
oh 80,000 - - -
400,000 250,000 - 150,000
oh 100,000 100,000 100,000 - -
oh 150,000 300,000 150,000 - 150,000
120,000 - - - -
400,000 - - 400,000
oh 400,000 400,000 - - 400,000
- - - -
oh 50,000 - - - -
-
250,000 - 250,000 -
oh 250,000 250,000 - 250,000 -
-
- - - -
oh 100,000 - - - -
- - - -
oh 150,000 - - - -
- - - -
- - - -
- - - -
- - - -
8,351,100 1,870,700 3,334,000 3,146,400
- - - -
2,135,000 - 2,135,000 -
- - - -
bh 30,000 1,050,000 - 1,050,000 -
bh 35,000 1,085,000 - 1,085,000 -

4,884,000 1,500,000 600,000 2,784,000

exp 8,500 1,530,000 765,000 - 765,000


exp 8,500 - - - 1,275,000
exp 1,000 - - - -
exp 15,000 135,000 135,000 - -
exp 12,000 144,000 - - 144,000
set 100,000 600,000 600,000 600,000 600,000
- - - -

587,100 215,700 179,000 202,400

lbr 300 38,100 14,700 15,000 8,400


lbr 200 162,000 54,000 54,000 54,000
lbr 200 24,000 8,000 8,000 8,000
lbr 200 - - - -
lbr 200 - - - -
lbr 200 - - - -
lbr 200 - - - -
lbr 200 18,000 6,000 6,000 6,000
lbr 200 8,000 - 8,000 -
lbr 200 60,000 20,000 20,000 20,000
lbr 200 30,000 10,000 10,000 10,000
lbr 200 71,000 25,000 26,000 20,000
lbr 200 10,000 20,000 - -
lbr 200 18,000 6,000 6,000 6,000
lbr 200 10,000 - 10,000 -
lbr 200 10,000 - 10,000 -
lbr 200 6,000 - 6,000 -
lbr 200 22,000 22,000 - -
lbr 200 - - - -
lbr 200 10,000 10,000 - -
lbr 200 30,000 - - 30,000
lbr - - - -
lbr - - - -
lbr - - - -
lbr - - - -
lbr - - - -
lbr 200 60,000 20,000 - 40,000
- - - -

735,000 155,000 420,000 160,000

exp 5,000 10,000 - - 10,000


exp 5,000 25,000 15,000 10,000 -
exp 5,000 40,000 - - 40,000
exp 5,000 400,000 - 400,000 -
exp 5,000 10,000 10,000 - -
exp 5,000 5,000 5,000 - -
exp 5,000 35,000 15,000 10,000 10,000
exp 5,000 10,000 10,000 - -
exp 5,000 30,000 30,000 - -
exp 5,000 10,000 10,000 - -
exp 5,000 10,000 10,000 - -
exp 5,000 - - - -
exp 5,000 50,000 - - 50,000
exp 5,000 100,000 50,000 - 50,000
-
-
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
14,855,000 3,335,000 2,060,000 9,460,000
- - - -

14,855,000 3,335,000 2,060,000 9,460,000

bks 25,000 - - - -
bks 40,000 160,000 160,000 - -
bks 15,000 540,000 180,000 180,000 180,000
bks 25,000 600,000 600,000 - -
bks 15,000 360,000 360,000 - -
bks 15,000 180,000 360,000 - -
bks 40,000 480,000 - 480,000 -
bks 15,000 450,000 - 450,000 -
bks 15,000 180,000 180,000 - -
bks 15,000 1,980,000 990,000 - 990,000
bks 15,000 990,000 - - 990,000
bks 15,000 - - - -
bks 25,000 525,000 225,000 - 300,000
bks 15,000 - - - -
bks 40,000 800,000 - 800,000 -
bks 15,000 150,000 - 150,000 -
bks 40,000 80,000 80,000 - -
bks 40,000 120,000 120,000 - -
bks 40,000 80,000 80,000 - -
bks 15,000 - - - -
bks 40,000 2,200,000 - - 2,200,000
bks 40,000 2,200,000 - - 2,200,000
bks 40,000 2,200,000 - - 2,200,000
bks 40,000 160,000 - - 160,000
bks 40,000 240,000 - - 240,000
- - - -
-
4,950,000 2,200,000 1,375,000 1,375,000
- - - -

4,950,000 2,200,000 1,375,000 1,375,000

keg 75,000 1,500,000 300,000 600,000 600,000


keg 100,000 400,000 200,000 100,000 100,000
keg 500,000 2,500,000 1,500,000 500,000 500,000
keg 25,000 250,000 100,000 75,000 75,000
org 50,000 300,000 100,000 100,000 100,000
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - -
- - -
17,245,900 3,529,300 9,173,300 4,543,300
- - -

2,140,000 420,000 1,000,000 720,000

- - - -

bh 250,000 500,000 250,000 - 250,000


bh 220,000 220,000 - - 220,000
Keg 250,000 500,000 - - 250,000
- - - -
bh 35,000 35,000 35,000 - -
bh 130,000 - - - -
bh 75,000 75,000 75,000 - -
bh 1,000,000 1,000,000 - 1,000,000 -
bh 90,000 - - - -
bh 200,000 - - - -
bh 60,000 60,000 - -
bh 750,000 - - - -

- - - -
- - - -
15,105,900 3,109,300 8,173,300 3,823,300
200,000 50,000 300,000
bh 25,000 450,000 150,000 - 300,000
btl 50,000 100,000 50,000 50,000 -
- 300,000 810,000 170,000
Klng 90,000 180,000 90,000 - 90,000
Klng 80,000 80,000 - - 80,000
m3 350,000 - - -
Klng 25,000 100,000 50,000 50,000
zak 80,000 320,000 160,000 160,000
biji 600 600,000 - 600,000
- - - -
klng 262,000 - - - -
m3 70,000 - - - -
m3 350,000 - - - -
truck 300,000 - - - -
bh 1,000,000 - - - -
- - - -
749,900 308,300 383,300 58,300
Klng 250,000 500,000 250,000 250,000 -
Klng 50,000 150,000 50,000 50,000 50,000
Klng 25,000 50,000 - 50,000 -
bh 10,000 10,000 - 10,000 -
bh 8,300 24,900 8,300 8,300 8,300
bh 15,000 15,000 15,000 -
- - 200,000 -
- - - -
duz 50,000 100,000 - 100,000 -
duz 50,000 100,000 - 100,000 -
- - - -
- 606,000 1,250,000 1,295,000
btg 30,000 90,000 - - 90,000
bh 10,000 20,000 - - 20,000
bh 5,000 5,000 - - 5,000
bh 5,000 15,000 - 15,000 -
bh 5,000 15,000 - 15,000 -
bh 21,000 126,000 126,000 - -
bh 450,000 - - - -
lbr 450,000 - - - -
bh 100,000 500,000 300,000 - 200,000
dus 50,000 300,000 - 300,000 -
bh 10,000 100,000 40,000 60,000 -
biji 600 300,000 - 300,000 -
zak 60,000 540,000 60,000 180,000 300,000
m3 300,000 900,000 - 300,000 600,000
kleng 80,000 240,000 80,000 80,000 80,000
7,350,000 350,000 5,000,000 2,000,000
klng 262,000 - - - -
m2 70,000 - - - -
m3 350,000 350,000 350,000 - -
truck 300,000 - - - -
bh 1,000,000 2,000,000 - 5,000,000 2,000,000

630,000 210,000 420,000 -


m2 80,000 - - - -
zak 70,000 630,000 210,000 420,000 -

1,195,000 1,135,000 60,000 -


kodi 240,000 720,000 720,000 - -
btl 70,000 210,000 210,000 - -
kg 15,000 90,000 30,000 60,000 -
lbr 80,000 160,000 160,000 - -
btg 15,000 15,000 15,000 - -

5,010,000 485,000 4,170,000 355,000


- - - -

485,000 4,170,000 355,000

- - - -
bh 240,000 240,000 240,000 - -
bh 350,000 - - - -
lsn 25,000 50,000 25,000 - 25,000
lsn 15,000 45,000 15,000 - 30,000
lsn 60,000 60,000 60,000 - 60,000
lsn 60,000 60,000 60,000 - -
mtr 200,000 - 4,000,000 -
bh 25,000 250,000 75,000 - 175,000
bh 10,000 30,000 10,000 20,000 -
bh 75,000 150,000 - 150,000 -
bh 65,000 65,000 - - 65,000
- - - -
- - - -
- - - -
- - - -
13,580,000 5,600,000 7,901,700 78,300
- - - -
875,000 - 875,000 -
- - - -

- 875,000 -

- - - -
875,000 875,000 - 875,000 -
bh 450,000 1,350,000 -
unit 1,500,000 - - - -
9,400,000 3,500,000 5,900,000 -

9,400,000 3,500,000 5,900,000 -

- - -
bh 2,500,000 - - - -
3,500,000 1,400,000 -
bh 450,000 1,800,000 2,250,000 900,000 -
bh 250,000 1,000,000 1,250,000 500,000 -
- 4,500,000 -
bh 300,000 3,000,000 - 3,000,000 -
bh 150,000 1,500,000 - 1,500,000 -
- - - -
2,166,500 2,100,000 1,126,700 78,300

- - - -
Eks - - - -
Eks - - - -
Eks - - - -
Eks - - - -
Eks - - - -
Eks - - - -
Eks - - - -
Eks - - - -
Eks - - - -
- - - -
Eks 17,600 - - - -
Eks 20,400 - - - -
Eks 17,000 - - - -
Eks 14,900 - - - -
Eks 15,800 - - - -
Eks 19,700 - - - -
- - - -
- - - -
- - - -
- - - -
2,166,500 2,100,000 1,126,700 78,300
2,100,000 2,100,000 1,060,200 -
- - -
Eks 18,700 374,000 - - 374,000
Eks 17,000 340,000 - - 340,000
Eks 18,200 364,000 - - 364,000
Eks 18,200 364,000 - - 364,000
Eks 18,700 - - - -
Eks 17,000 - - - -
Eks 18,200 - - - -
Eks 18,200 - - - -
- - 1,060,200 -
Eks 13,000 234,000 - 234,000 -
Eks 13,600 244,800 - 244,800 -
Eks 13,000 234,000 - 234,000 -
Eks 19,300 347,400 - 347,400 -
2,100,000 2,100,000 - -
Eks 35,000 - - - -
Eks 35,000 - - - -
Eks 35,000 - - - -
Eks 35,000 700,000 700,000 - -
Eks 35,000 700,000 700,000 - -
Eks 35,000 700,000 700,000 - -
66,500 - 66,500 78,300
66,500 - 66,500 -
Eks 19,900 19,900 - 19,900 -
Eks 14,200 14,200 - 14,200 -
Eks 16,500 16,500 - 16,500 -
Eks 15,900 15,900 - 15,900 -
Eks 19,900 - - - -
Eks 14,200 - - - -
Eks 16,500 - - - -
Eks 15,900 - - - -
- - 78,300
Eks 21,600 21,600 - - 21,600
Eks 17,600 17,600 - - 17,600
Eks 11,900 23,800 - - 23,800
Eks 15,300 15,300 - - 15,300

Tegalsari, 6 Januari 2020

Bendahara BOS

YUNI EKA KHANIFATUZZUHRO, S. Pd.


NIP. 199606242019022006
REKAPITULASI REALISASI PENGGUNAAN DANA BOS
PERIODE TANGGAL : 01 JANUARI - 30 APRIL 2020
CATURWULAN I TAHUN ANGGARAN 2020

NAMA SEKOLAH : SD NEGERI 3 TEGALSARI FORMAT K-7a


DESA/KELURAHAN : TEGALSARI
KAB/KOTA : PRINGSEWU
PROPINSI : LAMPUNG

NO PENGGUNAAN DANA BOS

Pengembangan Kegiatan Kegiatan Evaluasi Pengelolaan Pengembngan Langganan Pemeliharaan Pembayaran Pembelian
PROGRAM / KEGIATAN
URUT

Perpustakaan Penerimaan Pembelajaran Pembelajaran Sekolah Profesi guru Daya dan & perawatan honor /perawatan Jumlah
Siswa Baru dan & tendik Jasa sarpras multimedia
eskul pembelajaran
1 2 3 4 5 6 7 8 9 10
1.1 Pengembangan Kompetensi Lulusan 3,260,000 1,560,000 4,820,000
1.2 Pengembangan Standar Isi 250,000 250,000
1.3 Pengembangan Standar Proses 3,775,000 1,220,000 1,350,000 6,345,000
1.4 Pengembangan Pendidikan dan Tenaga Kependidikan 500,000 950,000 1,450,000
1.5 Pengembangan sarana dan prasarana Sekolah 2,496,700 60,000 2,556,700
1.6 Pengembangan Standar Pengelolaan 4,170,000 4,170,000
1.7 Pengembangan Standar Pembiayaan 1,620,000 2,040,000 266,800 5,040,000 8,966,800
1.8 Pengembangan dan Implementasi sistem Penilaian 1,021,000 2,180,500 100,000 3,301,500
JUMLAH 5,395,000 0 6,251,000 3,740,500 10,056,700 1,050,000 266,800 60,000 5,040,000 0 31,860,000

Menyetujui Tegalsari, 30 April 2020


Kepala Sekolah, Bendahara

S U S W A T I, S. Pd. YUNI EKA KHANIFATUZZUHRO, S. Pd.


NIP. 19650910 198603 2006 NIP.19960624 201902 2006
BUKU KAS UMUM
BULAN: JANUARI 2020

Nama Sekolah : SDN 3 TEGALSARI


Desa/Kecamatan : TEGALSARI/GADINGREJO
Kabupaten/Kota : PRINGSEWU
Provinsi : LAMPUNG

Tanggal No. Kode No Bukti

1 2 3
1/31/2020

Mengetahui
Kepala Sekolah

SUSWATI,S.Pd
NIP. 19650910 198603 2006
BUKU KAS UMUM
BULAN: JANUARI 2020

EGALSARI
ARI/GADINGREJO Formulir BOS-K3
EWU Diisi oleh Sekolah
NG Disimpan di Sekolah

Uraian Penerimaan Pengeluaran


(Debit) (Kredit)
4 5 6
Saldo Awal bulan Januari 2020

0.00 0.00

Tegalsari, Januari 2020


Bendahara/Guru

YUNI EKA KHANIFATUZZUHRO, S. Pd.


NIP. 19960624 201902 2006
mulir BOS-K3
oleh Sekolah
pan di Sekolah

Saldo

0.00

i, Januari 2020

A KHANIFATUZZUHRO, S. Pd.
60624 201902 2006
BUKU KAS UMUM
BULAN: FEBRUARI 2020

Nama Sekolah : SDN 3 TEGALSARI


Desa/Kecamatan : TEGALSARI/GADINGREJO Formulir BOS-K3
Kabupaten/Kota : PRINGSEWU Diisi oleh Sekolah
Provinsi : LAMPUNG Disimpan di Sekolah

Tanggal No. Kode No Bukti Uraian Penerimaan Pengeluaran Saldo


(Debit) (Kredit)
1 2 3 4 5 6 7
2/29/2020 Saldo Awal bulan Februari 2020

0.00 0.00 0.00

Mengetahui Tegalsari, Februari 2020


Kepala Sekolah Bendahara/Guru

SUSWATI, S. Pd. YUNI EKA KHANIFATUZZUHRO, S> Pd.


NIP. 19650910 198603 2006 NIP. 19960624 201902 2006
BUKU KAS UMUM
BULAN: MARET 2020

Nama Sekolah : SDN 3 TEGALSARI


Desa/Kecamatan : TEGALSARI / GADINGREJO Formulir BOS-K3
Kabupaten/Kota : PRINGSEWU Diisi oleh Sekolah
Provinsi : LAMPUNG Disimpan di Sekolah

No Penerimaan Pengeluaran Saldo


Tanggal No.Kode Uraian
Bukti (Debit) (Kredit)
1 2 3 4 5 6 7

3/26/2020 Penerimaan dana BOS Caturwulan I 31,860,000 31,860,000

3/27/2020 5.2.2 01 Pembayaran Transport pengambilan dana BOS 100,000 31,760,000

Dibayarkan administrasi pembuatan rekening Dana BOS (Perubahan


3/27/2020 5.2.2 02 20,000 31,740,000
Spesimen)

Dibayarkan transport perububahan spesimen rekening Dana BOS (Mobil


3/27/2020 5.2.2 03 300,000 31,440,000
dan Motor)

3/27/2020 5.2.2 04 Konsumsi Penyusunan RKAS dan Input ARKAS 200,000 31,240,000

Pembayaran pengadaan konsumsi rapat penyusunan RAPBS/RKAS 25.000


3/27/2020 5.2.2 05 250,000 30,990,000
x 10

3/27/2020 5.2.2 06 membayar jasa kegiatan pelaksanaan ulangan mid semester genap 30,990,000

3/27/2020 5.2.2 a. penanggung jawab pelaksananaan mid semester genap dan LUN/LUS 250,000 30,740,000

Diterima PPh 21, 5%;15% Penanggung jawab mid semester Genap


37,500 30,777,500
T.P 2019/2020

Dibayarkan PPh 21, 5%;15% Penanggung jawab mid semester Genap


37,500 30,740,000
T.P 2019/2020

3/27/2020 5.2.2 b. pengawas ruangan 4 hari kelas 1 s.d 6 490,000 30,250,000

Diterima PPh 21, 5%;15% Honor pengawas mid semester Genap T.P
53,500 30,303,500
2019/2020

Dibayarkan PPh 21, 5%;15% Honor pengawas mid semester Genap


53,500 30,250,000
T.P 2019/2020

3/27/2020 5.2.2 c. koreksi lembar jawaban 1,440,500 28,809,500

Diterima PPh 21, 5%;15% Honor Koreksi Jawaban mid semester


157,375 28,966,875
Genap T.P 2019/2020

Dibayarkan PPh 21, 5%;15% Honor Koreksi Jawaban mid semester


157,375 28,809,500
Genap T.P 2019/2020

3/27/2020 5.2.2 07 Konsumsi Guru 10 Orang (10.000 x 10 x 4 hari) 400,000 28,409,500

a. Membayar insentif penanggung jawab pelaksana kegiatan les tambahan


3/28/2020 5.2.2 08 100,000 28,309,500
kelas 6

Diterima PPh 21, 5%;15% Penanggung Jawab Pelaksana kegiatan


15,000 28,324,500
tambahan belajar les kelas 6

Dibayarkan PPh 21, 5%;15% Penanggung Jawab Pelaksana kegiatan


15,000 28,309,500
tambahan belajar les kelas 6

3/28/2020 5.2.2 09 b.Membayar Insentif penyaji materi/soal Kegiatan Les Tambahan kelas 6 651,000 27,658,500

Diterima PPh 21, 5%;15% Penyaji Materi kegiatan tambahan belajar


49,000 27,707,500
les kelas 6

Dibayarkan PPh 21, 5%;15% Penyaji Materi kegiatan tambahan


49,000 27,658,500
belajar les kelas 6

3/28/2020 5.2.2 10 Pembayaran ATK Habis Pakai 624,500 8,004,000

3/28/2020 5.2.2 11 Transport Pembelian ATK 50,000 7,954,000

3/28/2020 5.2.2 12 Dibayarkan Instal Ulang Laptop Acer 60,000 27,598,500

3/28/2020 5.2.2 13 Dibayarkan Pembelian Mouse Biasa dan Flashdisk 115,000 27,483,500
No Penerimaan Pengeluaran Saldo
Tanggal No.Kode Uraian
Bukti (Debit) (Kredit)
1 2 3 4 5 6 7
Dibayarkan Transpor Instal Ulang Laptop dan Pembelian peralatan IT di
3/28/2020 5.2.2 14 100,000 27,383,500
Bandar Lampung

Dibayarkan transport Bimtek Penyusunan Kisi-Kisi USBN "Mandiri


3/28/2020 5.2.2 15 100,000 27,283,500
Belajar"

3/28/2020 5.2.2 16 Dibayarkan Transport Tari Massal 200,000 27,083,500

3/28/2020 5.2.2 17 Dibayarkan Pendamping Tari Massal 2 orang 200,000 26,883,500

3/28/2020 5.2.2 18 Dibayarkan Konsumsi untuk Pendamping Tari Massal dan 20 Anak 300,000 26,583,500

3/28/2020 5.2.1 19 Pembayaran Honorarium Pendidik dan Tenaga Kependidikan 26,583,500

3/28/2020 5.2.1 Pembayaran Guru Honorer 1 orang 1,000,000 25,583,500

3/28/2020 5.2.1 Pembayaran Operator Dapodik 800,000 24,783,500

3/28/2020 5.2.1 Pembayaran Honor Penjaga Sekolah 2,000,000 22,783,500

3/28/2020 5.2.1 Pembayaran Tenaga Kependidikan (TU) 600,000 22,183,500

3/30/2020 5.2.2 20 Dibayarkan Transport Kegiatan Penyusunan Kisi Kisi Gugus 3 100,000 22,083,500

3/30/2020 5.2.2 21 Pembayaran biaya Potong rumput Halaman Sekolah 50,000 22,033,500

Pembayaran Sampul Ijazah @35.000 x 31 siswa dan Medali @25.000 x 31


3/30/2020 5.2.2 22 1,860,000 20,173,500
siswa

Diterima PPN 10% pembelian sampul Ijazah dan medali 169,100.00 20,342,600

Dibayarkan PPN 10% pembelian sampul Ijazah dan medali 169,100.00 20,173,500

3/30/2020 5.2.2 23 Pembayaran Buku Bahasa Lampung 1,760,000 18,413,500

3/30/2020 5.2.2 24 Pembayaran Pendaftaran Tari Massal Nusantara 700,000 17,713,500

3/30/2020 5.2.2 25 Pembayaran Pramuka Kwaran 500,000 17,213,500

3/30/2020 5.2.2 26 Pembayaran Buku Detik-Detik US Kelas 6 2,015,000 15,198,500

3/30/2020 5.2.2 27 Pembayaran Penggandaan Naskah soal mid Semester Genap 1,560,000 13,638,500

Diterima PPN 10% Pengadaan Naskah Mid Semester Genap T.P


141,900 13,780,400
2019/2020

Dibayarkan PPN 10% Pengadaan Naskah Mid Semester Genap T.P


141,900 13,638,500
2019/2020

3/30/2020 5.2.2 28 Pembayaran KKG PAI 450,000 13,188,500

3/30/2020 5.2.2 29 Pembayaran Plang SRA 950,000 12,238,500

3/30/2020 5.2.2 30 Pembayaran Papan K7 950,000 11,288,500

3/30/2020 5.2.2 31 Pembelian Buku Nilai K13 240,000 11,048,500

3/30/2020 5.2.2 32 Pembayaran Banner HUT Pringsewu dan MTQ 400,000 10,648,500

3/30/2020 5.2.2 33 Transport Kegiatan K3S 400,000 10,248,500

3/30/2020 5.2.2 34 Pembayaran Koran Diva 100,000 10,148,500

3/30/2020 5.2.2 35 Pembayaran Koran Ethis 200,000 9,948,500


No Penerimaan Pengeluaran Saldo
Tanggal No.Kode Uraian
Bukti (Debit) (Kredit)
1 2 3 4 5 6 7

3/30/2020 5.2.2 36 Pembayaran Koran Bongkar Pos 360,000 9,588,500

3/30/2020 5.2.2 37 Pembayaran Koran Buser/ Kupas Tuntas / Haluan Post 460,000 9,128,500

3/30/2020 5.2.2 38 Pembayaran Koran Media Pendidikan 100,000 9,028,500

3/30/2020 5.2.2 39 Pembayaran Koran Lampung Post 400,000 8,628,500

3/30/2020 5.2.2 40 Pembayaran Atk Habis Pakai 2 464,000 7,490,000

3/30/2020 5.2.2 41 Tranport Pembelian ATK 50,000 7,440,000

JUMLAH 32,483,375 25,043,375 7,440,000

Mengetahui, Tegalsari,30 Maret 2019


Bendahara

SUSWATI,S.Pd Yuni Eka Khanifatuzzuhro,S.Pd


NIP. 19650910 198603 2006 NIP. 19960624 201902 2006
175 PAJAK #REF! 750000

165

175

13950

23250

6200

158 4650

155 48050
175

186 spt

113 37500

113 32000

113 169100

49000

179 15000

179 302600

179

179

146 spt

113

113 98700

131

113

143

131

114 141900

146

165 #REF!

165 248375

133 #REF!

165

146 SPT

171

171
171

171

171

171

155 514

175 50

464
BUKU KAS UMUM
BULAN: APRIL 2020

Nama Sekolah : SDN 3 TEGALSARI


Desa/Kecamatan : TEGALSARI / GADINGREJO Formulir BOS-K3
Kabupaten/Kota : PRINGSEWU Diisi oleh Sekolah
Provinsi : LAMPUNG Disimpan di Sekolah

No Penerimaan Pengeluaran Saldo


Tanggal No.Kode Uraian
Bukti (Debit) (Kredit)
1 2 3 4 5 6 7

4/1/2020 Sisa Saldo Bulan Maret 2020 7,440,000 7,440,000

4/2/2020 5.2.2 42 Pembayaran ATK Habis Pakai 3 715,000 6,725,000

4/2/2020 5.2.2 43 Pembayaran Transport Pembelian ATK 50,000 6,675,000

Pembinaan kepada Guru dalam Pelaksanaan KBM dan Penyusunan


4/15/2020 5.2.2 44 250,000 6,425,000
Perangkat Pembelajaran
Diterima PPh 21, 5%;15% Pembinaan kepada guru dalam
37,500 6,462,500
Penyusunan Perangkat Pembelajaran
Dibayarkan PPh 21, 5%;15% Pembinaan kepada guru dalam
37,500 6,425,000
Penyusunan Perangkat Pembelajaran

4/15/2020 5.2.2 45 Penggandaan Perangkat Pembelajaran 1,350,000 5,075,000

Diterima PPN 10% atas cetak dan penggandaan Perangkat


122,700 5,197,700
Pembelajaran
Dibayarkan PPN 10% atas cetak dan penggandaan Perangkat
122,700 5,075,000
Pembelajaran

4/15/2020 5.2.2 46 Penggandaan berkas remidial 135,000 4,940,000

4/15/2020 5.2.2 47 Penggandaan Berkas Pengayaan 135,000 4,805,000

4/17/2020 5.2.2 48 Pembayaran ATK Habis Pakai 4 258,000 4,547,000

4/17/2020 5.2.2 49 Transport Pembelian ATK Habis Pakai 50,000 4,497,000

4/20/2020 5.2.2 50 pembayaran honor kegiatan pelatihan pramuka 2 orang pelatih 640,000 3,857,000

Diterima PPh 21, 5%;15% Pembayaran Honor kegiatan Pelatihan


32,000 3,889,000
Pramuka
Dibayar PPh 21, 5%;15% Pembayaran Honor kegiatan Pelatihan
32,000 3,857,000
Pramuka

4/20/2020 5.2.2 51 Pembelian Konsumsi Penyusunan Progja Pramuka 100,000 3,757,000

4/21/2020 5.2.2 52 Pembayaran langganan bulanan rekening daya listrik ( Januari-April ) 267,000 3,490,000

4/25/2020 5.2.2 53 Transport Manajerial Laporan BOS untuk Ketua (Kepala Sekolah) 7 hari 560,000 2,930,000

4/25/2020 5.2.2 54 Transport Manajerial Laporan BOS untuk Bendahara 7 hari 490,000 2,440,000

4/25/2020 5.2.2 55 Transport Manajerial Laporan BOS untuk Komite 7 hari 210,000 2,230,000

4/25/2020 5.2.2 56 Transport Manajerial Laporan BOS untuk wali murid 7 hari 140,000 2,090,000

Biaya Kebutuhan sehari-hari konsumsi guru dan pegawai sekolah ( Januari-


4/28/2020 5.2.2 57 580,000 1,510,000
April )

4/30/2020 5.2.2 58 Dibayarkan Pembelian Foto dan Frame Presiden dan Wakil Presiden 750,000 760,000
No Penerimaan Pengeluaran Saldo
Tanggal No.Kode Uraian
Bukti (Debit) (Kredit)
1 2 3 4 5 6 7

4/30/2020 5.2.2 59 Pembayaran Tabloid Waspada 400,000 360,000

4/30/2020 5.2.2 60 Pembayaran Koran Radar Tanggamus 360,000 0

JUMLAH 7,632,200 6,872,200 NIHIL

Mengetahui, Tegalsari, 30 April 2020


Bendahara

SUSWATI,S.Pd Yuni Eka Khanifatuzzuhro,S.Pd


NIP. 19650910 198603 2006 NIP. 19960624 201902 2006
175 PAJAK #REF! 750000

165

175

-12,000

165

158

155

175

186

113 360
400
750 130

1510

220,000
BUKU PEMBANTU BANK
BULAN JANUARI-APRIL CATURWULAN I TH 2020

Nama Sekolah : SDN 3 TEGALSARI


Desa/Kecamatan : TEGALSARI/ GADINGREJO
Kabupaten : PRINGSEWU
Provinsi : LAMPUNG

Tanggal No Kode No.Bukti Uraian


1 2 3 4

Saldo bulan September 2019


31/10/2019 Administrasi bulan Oktober 2019
29/11/2019 Administrasi bulan November 2019
12/10/2019 Penerimaan Dana BOS Triwulan IV Tahun 2019
12/12/2019 Pengambilan dana BOS Triwulan IV Tahun 2019

JUMLAH SALDO REKENING

Mengetahui
Kepala Sekolah,

SUSWATI, S. Pd.
NIP. 19650910 198603 2008
I TH 2020

FORMAT BOS K-5

Penerimaan Pengeluaran
Saldo
(Debit) (Kredit)
5 6 7

418,402.43 418,402.43
5,000.00 413,402.43
5,000.00 408,402.43
50,240,000.00 50,648,402.43
50,240,000.00 408,402.43

408,402.43

Tegalsari, 30 April 2020


Bendahara

YUNI EKA KHANIFATUZZUHRO, S. Pd.


NIP. 19960624 201902 2006
BUKU PEMBANTU PAJAK
BULAN : JANUARI s.d APRIL CATURWULAN I TAHUN 2020

Nama Sekolah : SDN 3 TEGALSARI


Desa/Kecamatan : Tegalsari/Gadingrejo
Kabupaten : Pringsewu
Provinsi : lampung

Penerimaan/ Debit
Tanggal No. Kode Nomor Uraian
Bukti PPN
1 2 3 4 5

14/12/2019 Dibayarkan PPh 21, 5%;15% program remedial


14/12/2019 Dibayarkan PPh 21, 5%;15% program pengayaan
17/12/2019 Dibayarkan PPN 10% taplak meja guru 209,000
17/12/2019 Dibayarkan PPN 10% Alat tulis kelas dan kantor 272,700
21/12/2019 Dibayarkan PPN 10% naskah PAS ganjil 390,000
21/12/2019 Dibayarkan PPN 10% teralis kantor 163,600
26/12/2019 Dibayarkan PPN 10% rapat wali murid 150,000.00
30/12/2019 Dibayarkan PPN 10% Gambar presiden dan wakil 145,500.00

JUMLAH 1,330,800

Mengetahui
Kepala Sekolah

SUSWATI, S. Pd.
NIP. 19650910 198603 2008
U PAJAK
URWULAN I TAHUN 2020

Format BOS-K6
Diisi oleh Bendahara/Guru
Disimpan di sekolah

Penerimaan/ Debit
PPh Pasal 21 PPh Pasal 23 Pengeluaran (Kredit) Saldo
6 7 8 9

350,000 350,000
350,000 350,000
209,000
272,700
390,000
163,600
150,000
145,500
0

700,000 2,030,800

Tegalsari, 30 April 2020


Bendahara

YUNI EKA KHANIFATUZZUHRO, S. Pd.


NIP. 19960624 201902 2006
Koreksi PPH Terima Pengawas PPH
SUSWATI 1 21 157500 23625 133875 50000 7500
UTAMI Y 2 18 135000 6750 128250 50000 2500
TUGIYATI 3 13 65000 9750 55250 50000 7500
WINARSIH 4 19 190000 28500 161500 50000 7500
SULASIAH 5 17 170000 25500 144500 50000 7500
SUROSO 6 31 155000 23250 131750 50000 7500
YUNI EKA PAI 174500 8725 165775 60000 3000
SUTAMI PJOK 116000 17400 98600 40000 6000
SITI N B. LAMP 174500 8725 165775 60000 3000
B. ING 103000 5150 165775 30000 1500

1440500 157375 490000 53500

58500 44000 31000


44000 72000 72000 490000
72000 116000
174500
Terima PJ Pph Terima Total
42500 250000 37500 212500 388875
47500 175750
42500 97750
42500 204000
42500 187000
42500 174250
57000 222775
34000 132600
57000 222775
28500 194275

37500 248375
BUKU KAS UMUM
BULAN: APRIL 2020

Nama Sekolah : SDN 3 TEGALSARI


Desa/Kecamatan : TEGALSARI / GADINGREJO
Kabupaten/Kota : PRINGSEWU
Provinsi : LAMPUNG

No
Tanggal No.Kode Bukti
1 2 3

08
09

15
16
18

22
17
21

54

20
3/28/2020 14
23
31
05
42

04
02

24
25
30
3/10/2019 522:02:01 45

33
34
36
37
38
39
3/26/2020 522:07:02 01
03

06

43

3/28/2019 522.08.4.4.1 53
4/13/2020 51
10
11
12
13
50

07
3/26/2020
3/26/2020
522:08:01 44

3/11/2019 522:08:02 46

3/27/2019 522:02:01
3/27/2019 522:08:03 48

3/27/2019 522.07.3.3.1 49
52

54
55

Mengetahui,

SUSWATI,S.Pd
NIP. 19650910 198603 2008
BUKU KAS UMUM
BULAN: APRIL 2020

SDN 3 TEGALSARI
TEGALSARI / GADINGREJO Formulir BOS-K3
PRINGSEWU Diisi oleh Sekolah
LAMPUNG Disimpan di Sekolah

Penerimaan
Uraian
(Debit)
4 5

Dibayarkan Transport Tari Massal


Dibayarkan Pendamping Tari Massal 2 orang
Dibayarkan Konsumsi untuk Pendamping Tari Massal dan 20 Anak
Pembayaran Medali @25.000 x 31 siswa
Pembayaran Sampul Ijazah @35.000 x 31 siswa
Pembayaran Pendaftaran Tari Massal Nusantara
a. Pembinaan kepada Guru dalam Pelaksanaan KBM dan Penyusunan
Perangkat Pembelajaran
Pembayaran Penggandaan Naskah soal mid Semester Genap
Pembayaran Buku Bahasa Lampung
Pembayaran Buku Detik-Detik US Kelas 6
Pembelian Buku Nilai K13
Pembelian Konsumsi Penyusunan Progja Pramuka 2 orang
Dibayarkan Konsumsi Rapat Bulanan Guru 20.000 x 10 orang x 4 kali
b. Penggandaan Perangkat Pembelajaran
Pembayaran Pramuka Kwaran
Dibayarkan Trasport Kegiatan K3S
Pembayaran KKG PAI
Kegiatan K3S
Dibayarkan Pembelian Mouse Biasa dan Flashdisk
Pembayaran ATK Habis Pakai
Pembayaran Atk Habis Pakai 2
Pembayaran ATK Habis Pakai 3
Pembayaran ATK Habis Pakai 4
Dibayarkan Instal Ulang Laptop Acer
Dibayarkan administrasi pembuatan rekening Dana BOS (Perubahan
Spesimen)
Konsumsi Penyusunan RKAS dan Input ARKAS
Pembayaran Plang SRA
Pembayaran K7
Pembayaran Banner HUT Pringsewu dan Khotmil Qur'an
Pembayaran pengadaan konsumsi rapat penyusunan RAPBS/RKAS 25.000 x
10
a. Ketua (Kepala Sekolah)
b. Bendahara
c. Komite Sekolah
d. Wali Murid
Pembayaran Koran Diva
Pembayaran Koran Ethis
Pembayaran Koran Bongkar Pos
Pembayaran Koran Buser/ Kupas Tuntas / Haluan Post
Pembayaran Koran Media Pendidikan
Pembayaran Koran Lampung Post
Pembayaran Transport pengambilan dana BOS
Dibayarkan transport perububahan spesimen rekening Dana BOS (Mobil
dan Motor)
Dibayarkan Transpor Instal Ulang Laptop dan Pembelian peralatan IT di
Bandar Lampung
Transport Pembelian ATK
Tranport Pembelian ATK
Pembayaran Transport Pembelian ATK
Tansport Pembelian ATK Habis Pakai
Konsumsi Guru 10 Orang (10.000 x 10 x 4 hari)
Biaya Kebutuhan sehari-hari konsumsi guru dan pegawai sekolah
Pembayaran langganan bulanan rekening daya listrik
Pembayaran Guru Honorer 1 orang
Pembayaran Operator Dapodik
Pembayaran Honor Penjaga Sekolah
Pembayaran Tenaga Kependidikan (TU)
pembayaran honor kegiatan pelatihan pramuka 2 orang pelatih
c. Penggandaan berkas remidial
d. Penggandaan Berkas Pengayaan
a. penanggung jawab pelaksana kegiatan
b. penyaji materi/soal
a. penanggung jawab pelaksananaan mid semester genap dan LUN/LUS
b. pengawas ruangan 4 hari kelas 1 s.d 6
c. koreksi lembar jawaban
Dibayarkan transport Bimtek Penyusunan Kisi-Kisi USBN "Mandiri Belajar"

penerimaan dana BOS Caturwulan I 31,860,000


Pembayaran Honorarium Pendidik dan Tenaga Kependidikan

Pembayaran naskah soal ulangan mid semester genap


Terima PPN Ps 22(10%) naskah soal ulangan mid semester genap
Bayar PPN Ps 22(10%) naskah soal ulangan mid semester genap

Pembayar jasa kegiatan belajar mengajar (KBM)


Terima PPh Ps 21 (15%) intensif kepanitiaan kegiatan KBM
Bayar PPh Ps 21 (15%) intensif kepanitiaan kegiatan KBM

membayar jasa kegiatan pelaksanaan ulangan mid semester genap


d. terima Pph Ps 20 (15%) jasa kegiatan pelaksanaan ulangan mid semester
LUN/LUS
d. bayar Pph Ps 20 (15%) jasa kegiatan pelaksanaan ulangan mid semester
LUN/LUS
membayar jasa kegiatan tambahan belajar les kelas 6
Manajerial Laporan BOS (Transport 7 hari)

JUMLAH 31,860,000

Tegalsari,30 Maret 2019


Bendahara

Yuni Eka Khanifatuzzuhro,S.Pd


NIP. 19960624 201902 2006
Formulir BOS-K3
Diisi oleh Sekolah
Disimpan di Sekolah

Pengeluaran
(Kredit)
6

200,000 113
200,000 113
300,000 113
775,000 113
1,085,000 113
700,000 113

250,000
113 3,510,000 3,260,000
1,560,000 114 1,560,000
1,760,000 131 3,775,000
2,015,000 131
240,000 133
100,000 133
880,000 133 1,220,000
1,350,000 135 1,350,000
500,000 143 500,000
100,000 146
450,000 146
400,000 146 950,000
115,000 155
424,500 155
514,000 155
915,000 155
528,280 155 2,496,780 2696780
60,000 158 60,000

20,000
165
200,000 165
950,000 165
950,000 165
200,000 165

250,000
165
560,000 165
490,000 165
210,000 165
140,000 165 3,970,000 4,170,000
100,000 171
200,000 171
360,000 171
460,000 171
100,000 171
400,000 171 1,620,000
100,000 175

300,000
175

100,000
175
50,000 175
50,000 175
50,000 175
50,000 175
400,000 175
940,000 175 2,040,000
266,720 177 266,720
1,000,000 179
800,000 179
2,000,000 179
600,000 179
640,000 179 5,040,000
135,000 183
135,000 183
100,000 183
651,000 183 1,021,000

250,000
184
490,000 184
1,440,500 184 2,180,500

100,000
186 100,000
31,260,000

sari,30 Maret 2019

Eka Khanifatuzzuhro,S.Pd
19960624 201902 2006

Anda mungkin juga menyukai