CV Bina Serasi Rab Saluran Depan Rumah Dinas
CV Bina Serasi Rab Saluran Depan Rumah Dinas
HARGA HARGA
SATUAN SATUAN
NO URAIAN SATUAN
SEMESTER 1 SEMESTER 2
Rp. Rp.
1 2 3 4 5
Ahli Muda
- Gol. II-A 5 1 Org/Bulan 6,500,000 6,500,000
- Gol. II-B 6 2 Org/Bulan 7,100,000 7,100,000
- Gol. II-C 7 3 Org/Bulan 7,700,000 7,700,000
- Gol. II-D 8 4 Org/Bulan 8,400,000 8,400,000
Ahli Madya
- Gol. III-A 9 5 1 Org/Bulan 8,800,000 8,800,000
- Gol. III-B 10 6 2 Org/Bulan 9,400,000 9,400,000
- Gol. III-C 11 7 3 Org/Bulan 10,000,000 10,000,000
- Gol. III-D 12 8 4 Org/Bulan 10,600,000 10,600,000
Ahli Utama
- Gol. IV-A 13 9 5 Org/Bulan 10,500,000 10,500,000
- Gol. IV-B 14 10 6 Org/Bulan 11,800,000 11,800,000
- Gol. IV-C 15 11 7 Org/Bulan 12,400,000 12,400,000
- Gol. IV-D 16 12 8 Org/Bulan 13,100,000 13,100,000
Ahli Kepala
- Gol. ]V-A 17 13 9 Org/Bulan 13,800,000 13,800,000
- Gol. V-B 18 14 10 Org/Bulan 14,200,000 14,200,000
- Gol. V-C 19 15 11 Org/Bulan 14,700,000 14,700,000
- Gol. V-D 20 16 12 Org/Bulan 15,200,000 15,200,000
2 Asisten Muda : S1 (baru lulus) pengalaman 1 s/d 4 tahun Org/Bulan 4,600,000 4,600,000
3 Teknisi
a. S 0 / D3 pengalaman 1 s/d 3 tahun Org/Bulan 3,900,000 3,900,000
b. S 0 / D3 pengalaman 4 s/d 7 tahun Org/Bulan 4,600,000 4,600,000
c. S 0 / D3 pengalaman 8 s/d 11 tahun Org/Bulan 5,200,000 5,200,000
4 Tenaga Penunjang
HARGA HARGA
SATUAN SATUAN
NO URAIAN SATUAN
SEMESTER 1 SEMESTER 2
Rp. Rp.
II BAHAN/MATERIAL
A BAHAN DASAR
BATU KALI
1 Batu pecah 0,5/1 (pecah mesin) ( chip ) M3 350,000 350,000
2 Batu pecah 1/2 (pecah mesin) M3 350,000 350,000
3 Batu pecah 2/3 (pecah mesin) M3 330,000 330,000
4 Batu pecah 3/5 (pecah mesin) M3 330,000 330,000
5 Batu pecah 4/6 (pecah tangan) M3 300,000 300,000
6 Batu pecah 5/7 (pecah tangan) M3 300,000 300,000
7 Batu belah / pecah 7/10 - 10/15 - 15/20 M3 350,000 350,000
8 Batu belah/pecah besar M3 330,000 330,000
9 Batu blondhos M3 165,000 200,000
BATU BATA
1 Batu Bata biasa Buah 900 900
PASIR
1 Pasir beton M3 380,000 380,000
2 Pasir pasang M3 380,000 380,000
3 Pasir urug M3 143,000 143,000
4 Sirtu M3 220,000 220,000
TANAH
1 Tanah Lempung M3 49,500 50,000
2 Tanah Padas M3 77,000 80,000
3 Tanah urug M3 71,500 75,000
HARGA HARGA
SATUAN SATUAN
NO URAIAN SATUAN
SEMESTER 1 SEMESTER 2
Rp. Rp.
PORTLAND CEMENT
1 PC / Cement (40 Kg) Zak 45,500 45,500
PC / Cement Kg 1,138 1,138
2 PC / Semen putih (40 kg) Zak 90,000 90,000
PC / Semen warna Kg 2,250 2,250
3 Semen Instant MU 380 - Perekat Bata Ringan Kg 4,100 4,100
4 Semen Instant MU 100 - Plesteran Kg 1,600 1,600
5 Semen Instant MU 200 - Acian Kg 4,300 4,300
KAPUR
1 Kapur pasang Kg 6,600 6,600
2 Kapur pasang M3 247,500 247,500
HARGA HARGA
SATUAN SATUAN
NO URAIAN SATUAN
SEMESTER 1 SEMESTER 2
Rp. Rp.
ASBES NOK
1 Nok steel gelombang besar 108 cm Buah 46,500 46,500
2 Nok steel gelombang kecil 105 cm Buah 30,500 30,750
SENG PLAT
1 Seng plat BJLS 20 x 90 cm M' 24,800 24,800
2 Seng plat BJLS 30 x 60 cm M' 22,000 22,000
SENG GELOMBANG
1 Seng gelombang BJLS 20, panjang 180 cm x 85 cm lembar 48,400 50,250
2 Seng gelombang BJLS 20, panjang 210 cm x 85 cm lembar 50,000 58,000
3 Seng gelombang BJLS 20, panjang 240 cm x 85 cm lembar 56,000 66,250
HARGA HARGA
SATUAN SATUAN
NO URAIAN SATUAN
SEMESTER 1 SEMESTER 2
Rp. Rp.
GALVALUME
1 Atap Galvalume warna natural uk. 0,3 x 2,1, t.0,3 mm M2 63,200 80,000
2 Atap Galvalume fin. Warna tebal 0,3 mm M2 43,400 65,000
3 Atap Galvalume Berpasir tebal 0.30 cm tebal 0,3 mm M2 90,000 94,000
4 Nok Galvalume Berpasir M' 82,200 85,500
HARGA HARGA
SATUAN SATUAN
NO URAIAN SATUAN
SEMESTER 1 SEMESTER 2
Rp. Rp.
C BAHAN KAYU
BENGKIRAI
1 Kayu bengkirai (balok) M3 11,649,300 11,649,000
2 Kayu bengkirai (papan) M3 13,000,000 13,000,000
3 Kayu bengkirai 2/3 M3 9,739,600 9,750,000
4 Kayu bengkirai 3/5 M3 11,000,000 9,750,000
5 Kayu bengkirai 5/7 M3 8,773,800 9,750,000
KRUING
1 Kayu Kruing (Balok) M3 7,893,600 7,800,000
2 Kayu Kruing (papan) M3 13,062,500 13,000,000
3 Kayu Kruing 2/3 M3 8,020,800 7,150,000
4 Kayu Kruing 3/5 M3 7,104,200 7,150,000
5 Kayu Kruing 5/7 M3 7,451,200 7,150,000
MERANTI
1 Kayu Meranti (Balok) M3 5,300,000 5,300,000
2 Kayu Meranti (papan) M3 6,000,000 6,000,000
3 Kayu Meranti 2/3 M3 5,600,800 5,600,000
4 Kayu Meranti 3/5 M3 5,600,800 5,600,000
5 Kayu Meranti 5/7 M3 5,600,800 5,600,000
KAMPER
1 Kayu kamfer (balok) M3 8,500,000 8,500,000
2 Kayu Kamfer (papan) M3 10,000,000 11,000,000
3 Kayu kamfer 2/3 M3 6,000,000 7,900,000
4 Kayu kamfer 3/5 M3 6,000,000 7,900,000
5 Kayu kamfer 5/7 M3 7,660,700 7,900,000
LANAN
1 Kayu Lanan/Tahun papan M3 4,100,000 4,100,000
2 Kayu Lanan/Tahun Balok 8/12 M3 4,100,000 4,100,000
3 Kayu Lanan/Tahun Balok 6/12 M3 3,615,000 3,615,000
4 Kayu Lanan/Tahun Usuk 5/7 M3 3,000,000 3,000,000
5 Kayu Lanan/Tahun Usuk 4/6 M3 1,100,000 1,100,000
6 Kayu Lanan/Tahun Reng 3/5 M3 1,100,000 1,100,000
7 Kayu Lanan/Tahun Reng 2/3 M3 1,100,000 1,100,000
SENGON
1 Kayu Sengon Balok 8/12 M3 3,450,000 3,500,000
2 Kayu Sengon Balok 6/12 M3 4,583,300 3,300,000
3 Kayu Sengon Usuk 5/7 M3 2,933,300 3,000,000
4 Kayu Sengon Usuk 4/6 M3 2,673,600 2,600,000
5 Kayu Sengon Reng 3/5 M3 2,000,000 2,600,000
6 Kayu Sengon Reng 2/3 M3 1,200,000 2,600,000
7 Kayu Sengon Papan M3 1,203,100 1,200,000
JATI
1 Kayu Jati (balok) Kw.II M3 22,550,000 22,000,000
2 Kayu Jati papan KW II M3 25,300,000 20,500,000
3 Kayu Jati Kw.I M3 29,000,000 28,500,000
HARGA HARGA
SATUAN SATUAN
NO URAIAN SATUAN
SEMESTER 1 SEMESTER 2
Rp. Rp.
DOLKEN
1 Kayu dolok DN / Dolken 8-10 cm Batang 35,000 17,500
2 Kayu cetakan M3 3,450,000 3,400,000
3 Kayu bakar M3 143,000 140,000
4 Bambu Ø 8-10 cm p = 4 m Batang 11,000 12,500
5 Bambu Ø 10-12 cm p = 4 m Batang 25,000 23,500
6 Batang kelapa 4 m Batang 300,000 400,000
TEAKWOOD
1 Taek wood 90 x 210 x 4 mm Lembar 72,500 75,000
2 Taek wood 90 x 210 x 9 mm Lembar 115,000 115,000
HARGA HARGA
SATUAN SATUAN
NO URAIAN SATUAN
SEMESTER 1 SEMESTER 2
Rp. Rp.
MULTIPLEK
1 Multiplek 120 x 240 x 6 mm Lembar 93,000 90,000
2 Multiplek 120 x 240 x 9 mm Lembar 140,000 110,000
3 Multiplek 120 x 240 x 12 mm Lembar 167,000 140,000
TRIPLEK
1 Triplek 120 x 240 x 3 mm Lembar 71,500 71,000
Triplek 120 x 240 x 4 mm Lembar 75,000
2 Triplek 120 x 240 x 5 mm Lembar 80,700 80,000
GRANIT
1 Ubin Granit 60 x 60 ex. Granito, Platinum dll M2 245,000 250,000
2 Ubin Granit 60 x 60 ex. Indogress, garuda dll M2 126,500 100,000
LAIN-LAIN
1 Batu candi 30 x 30 M2 137,500 130,000
2 Batu koral sikat M2 60,000 75,000
3 Batu Palimanan M2 143,000 160,000
4 Batu andesit bakar M2 137,000 130,000
5 Batu lempeng M2 70,000 90,000
6 Batu serit hitam M2 100,000 110,000
7 Hospital Plint 10x40 cm ex. Milan / Roman 25 bh/Dos 1,000,000 975,000
8 Hospital Plint 8x30 cm ex. Milan / Roman 30 bh/Dos 543,000 550,000
9 Ubin defebel 20x20 Bh 40,000 40,000
10 Ubin anti sleep Bh 60,000 60,000
11 Marmer 100x100 M2 2,000,000 1,950,000
12 Karpet M2 130,000 130,000
13 Lantai Parquet M2 210,000 210,000
14 Lantai Vinyl M2 495,000 495,000
15 Vynil Untuk Medikal ( Terpasang ) M2 540,000 650,000
16 Kuku Macan 10 cm Bh 1,800 1,000
17 Stepnosing Keramik Uk. 8x30 cm Bh 12,500 12,000
18 Stepnosing Keramik Uk. 8x40 cm Bh 15,000 15,500
19 Stepnosing Keramik Uk. 8x60 cm Bh 30,000 30,000
HARGA HARGA
SATUAN SATUAN
NO URAIAN SATUAN
SEMESTER 1 SEMESTER 2
Rp. Rp.
E BAHAN CETAK
BUIS BETON
1 Gorong-gorong DN 20 cm , panjang 1 meter Buah 49,500 55,500
2 Gorong-gorong DN 30 cm, panjang 1 meter Buah 71,000 62,500
3 Gorong-gorong DN 40 cm, panjang 1 meter Buah 82,500 85,000
4 Gorong-gorong DN 50 cm , panjang 1 meter Buah 110,000 92,500
5 Gorong-gorong DN 60 cm, panjang 1 meter Buah 143,000 100,000
6 Gorong-gorong DN 70 cm, panjang 0,5 meter Buah 132,000 110,000
7 Gorong-gorong DN 80 cm, panjang 0.5 meter Buah 145,000 115,000
8 Gorong-gorong DN 100 cm panjang 0.5 meter Buah 247,000 175,000
9 Got Type U - 15 cm, panjang 1 m Buah 33,000 33,000
10 Got Type U - 20 cm, panjang 1 m Buah 44,000 44,000
11 Got Type U - 30 cm, panjang 1 m Buah 55,000 55,000
12 Got Type U - 40 cm, panjang 1 m Buah 71,500 71,500
13 Buis Beton Bulat Q 30 x 100 = 3 cm Bh 79,200 79,000
14 Buis Beton Bulat Q 40 x 100 = 4 cm Bh 106,700 105,000
15 Buis Beton Bulat Q 50 x 100 = 5 cm Bh 89,100 110,000
16 Buis Beton Bulat Q 60 x 50 = 6 cm Bh 118,800 118,000
ROOSTER
1 Rooster 10 x 20 cm (PC) Buah 16,500 11,000
2 Rooster 15 x 25 cm (PC) Buah 19,200 14,000
3 Rooster 15 x 30 cm (PC) Buah 11,300 17,000
4 Rooster 20 x 20 cm (PC) Buah 17,900 13,500
5 Rooster 25 x 25 cm (PC) Buah 22,000 17,500
6 Rooster 30 x 30 cm (PC) Buah 27,500 20,000
PANEL BETON
1 Pagar Panel Beton Precast 160 m2 = 4 Lembar Panel 225x17,5x17,5 cm (harga ter M' 641,000
2 Pagar Panel Beton Precast 200 m2 = 5 Lembar Panel 280x17,5x17,5 cm (harga ter M' 717,000
3 Pagar Panel Beton Precast 240 m2 = 6 Lembar Panel 320x17,5x17,5 cm (harga ter M' 823,000
4 Pagar Panel Beton Precast 280 m2 = 7 Lembar Panel 370x17,5x17,5 cm (harga ter M' 944,000
5 Pagar Panel Beton Precast 320 m2 = 8 Lembar Panel 400x17,5x17,5 cm (harga ter M' 1,020,000
DINDING BLOCK
1 Bataco 40 x 20 x 10 cm Buah 3,000 3,000
2 Bata Exspose Buah 4,000 4,500
3 Bata Ringan
Ukuran 7,5 x 20 x 60 cm (isi 111 buah/m3) M3 760,000 900,000
Ukuran 10 x 20 x 60 cm (isi 83 buah/m3) M3 810,000 810,000
F BAHAN BESI
BESI BETON
1 Besi beton polos SNI Kg 10,500 10,500
2 Besi beton ulir SNI Kg 10,500 10,500
3 Besi presstred polos Kg 8,800 9,000
4 Besi sengkang (angkur, baut) Kg 21,000 21,000
BESI PROFIL
1 Besi Profil C Kg 13,200 13,000
2 Baja IWF Kg 13,200 13,000
3 Besi Profil Siku Kg 13,200 13,000
BESI PLAT
1 Besi strip plat t= 2 mm Kg 13,200 13,000
2 Besi strip 0,5 cm Kg 25,300 13,000
BRC
1 BRC t = 120 x 240 cm Galvanis Ø 6mm Buah 300,000 242,500
2 BRC t = 150 x 240 cm Galvanis Ø 6mm Buah 385,000 360,000
3 BRC t = 120 x 240 cm Galvanis Ø 8mm Buah 660,000 490,000
4 BRC t = 150 x 240 cm Galvanis Ø 7mm Buah 750,000 465,000
5 BRC (tiang t = 120 ) Galvanis Buah 86,500 86,500
6 BRC (tiang t = 150 ) Galvanis Buah 118,800 118,800
WIREMESH
1 Wiremesh M6 Uk. 2,1x5,4 Lembar 412,500 412,500
2 Wiremesh M7 Uk. 2,1x5,4 Lembar 522,500 522,500
3 Wiremesh M8 Uk. 2,1x5,4 Lembar 632,500 632,500
4 Wiremesh M10 Uk. 2,1x5,4 Lembar 962,500 962,500
HOLLOW
1 Hollow 40.40.4 Batang 33,000 33,000
2 Hollow 30.30.3 Batang 30,300 30,300
3 Hollow 20.40.4 Batang 27,500 27,500
KAWAT
1 Kawat beton/Bendrat Kg 20,000 20,000
2 Kawat Bronjong Galvanis Kg 14,300 16,000
3 Kawat duri (50 m) Rol 71,500 68,000
4 Kawat kasa besi M' 23,100 22,500
5 Bronjong fabrikasi 2,7 mm Unit/M3 300,000 300,000
6 Bronjong fabrikasi 3,4 mm Unit/M3 325,000 325,000
SOFT BOARD
1 Gypsum Board Lembar 69,300 69,000
HARD BOARD
1 Kalsi Board Lembar 69,000 69,000
ETERNIT
1 Asbes Plat/ eternity 1,0 m x 1,0 m Lembar 17,100 17,000
PLAFOND PVC
1 Plafond PVC ex Shunda Plafond M2 280,000 280,000
HARGA HARGA
SATUAN SATUAN
NO URAIAN SATUAN
SEMESTER 1 SEMESTER 2
Rp. Rp.
LIST PROFIL
1 Lis Gipsum 12 cm M' 16,400 15,500
2 Lis Gipsum 7 cm M' 12,000 12,000
3 Lis Gipsum 9 cm M' 13,500 13,500
4 Lis kayu profil M' 6,800 7,250
H BAHAN FINSHING
CAT KAYU
1 Amril / amplas Lembar 3,000 3,000
2 Cat Kayu Kg 61,000 61,000
3 Cat Meni Kg 22,000 22,000
5 Dempul Plamur kayu Kg 16,600 27,250
6 Minyak cat/super tiner Liter 20,000 20,000
7 Plitur Liter 44,000 62,500
8 Coating batu alam Kg 70,000 65,000
9 Vernis Liter 45,500 45,500
11 Kuas cat 3 inchi Buah 7,000 7,000
12 Kuas cat 4 inchi Buah 15,000 15,000
13 Rol cat Buah 20,000 24,500
CAT TEMBOK
1 Cat Tembok interior ex. Catylac Kg 30,000 35,000
2 Cat Tembok exterior ex. Dulux Kg 80,000 110,000
3 Siler/Cat Dasar Tembok ex. Dulux Kg 44,000 75,000
4 Plamir tembok Kg 20,000 25,000
5 Cat Waterproof Kg 55,000 90,000
CAT BESI
1 Amplas Besi Lembar 5,000 5,000
2 Cat besi Kg 63,000 60,000
3 Cat brom Kg 65,000 75,000
4 Spiritus Liter 12,000 13,000
CAT EPOXY
1 Epoxy coating tebal 200 mikron M2 132,000 132,000
2 Epoxy coating tebal 300 mikron M2 165,000 165,000
3 Epoxy coating tebal 500 mikron M2 209,000 209,000
4 Epoxy coating tebal 1000 mikron M2 275,000 275,000
I BAHAN KACA
KACA POLOS / BENING
1 Kaca bening 3 mm M2 82,500 82,500
2 Kaca bening 5 mm M2 110,000 125,000
3 Kaca bening 10 mm M2 210,000 225,000
KACA RAYBAND
1 Kaca ryben 5 mm M2 99,000 100,000
HARGA HARGA
SATUAN SATUAN
NO URAIAN SATUAN
SEMESTER 1 SEMESTER 2
Rp. Rp.
LAIN-LAIN
1 Kaca Tempered 10 mm M2 410,000 425,000
2 Kaca Tempered 12 mm M2 650,000 650,000
4 Kaca es/dop M3 110,000 150,000
6 Kaca Cermin M2 250,000 235,000
7 Jendela Nako M' 15,000 17,500
HARGA HARGA
SATUAN SATUAN
NO URAIAN SATUAN
SEMESTER 1 SEMESTER 2
Rp. Rp.
KUSEN UPVC
1 Profil Rangka Jendela UPVC Putih Setara Bosca Batang 1,290,000 1,300,000
2 Profil Rangka Pintu UPVC Putih Setara Bosca Batang 1,896,000 1,900,000
L BAHAN SANITAIR
1 Batchuip Bh 800,000 950,000
2 Bak Fibreglass Bh 300,000 350,000
3 Bak Cuci Piring Unit 250,000 280,000
4 Floor Drain Bh 71,500 60,000
5 Kloset duduk lengkap Buah 1,500,000 1,200,000
6 Kloset jongkok Buah 185,000 140,000
7 Urinoir Bh 375,000 400,000
8 Water drain Bh 60,000 60,000
9 Wastafel INA Bh 190,000 190,000
10 Fiberglass Septictank Bio Filter Kap. 2-4 Org Unit 5,258,000 5,521,000
11 Fiberglass Septictank Bio Filter Kap. 4-6Org Unit 6,600,000 6,930,000
12 Fiberglass Septictank Bio Filter Kap. 6-8 Org Unit 7,900,000 8,295,000
13 Fiberglass Septictank Bio Filter Kap. 8-10 Org Unit 10,800,000 11,340,000
14 Tangki Air Fiber 1100 Liter Buah 1,150,000 1,715,000
15 Tangki Air Fiber 2200 Liter Buah 6,367,000 6,500,000
16 Tangki Air Fiber 550 Liter Buah 690,000 1,005,000
17 Tangki Air Stainless 1000 Liter Buah 3,744,000 3,931,000
18 Tangki Air Stainless 2000 Liter Buah 6,367,000 6,685,000
19 Tangki Air Stainless 500 Liter Buah 1,776,000 1,865,000
N BAHAN LAIN-LAIN
1 Air M3 15,000.0 80,000
2 Air Ltr 15.0 80
3 Allumunium Foil / Sisalation M2 8,200 8,500
4 Allumunium Foil Super Woven Single M2 25,000 45,000
5 Folding gate 0.4 M² 555,000 550,000
6 Folding gate 0.8 M² 625,000 650,000
7 Formica Lembar 75,000 74,000
9 High Prssure Laminated (HPL) Uk. 244 x 122 cm Lembar 160,000 190,000
10 Minyak Oli/Pelumas Liter 30,000 30,000
17 Sandblasting Set 250,000 250,000
18 Sabun Kg 12,500 10,000
19 Sealer Tube 60,000 57,500
20 Soda Api Kg 11,000 18,000
21 Solar Liter 5,900 9,000
29 Woodplank 2/20 M' 16,200 17,500
30 Aspalt penetrasi 60/70 Kg 9,000 9,500
31 AC-BC Ton 1,183,200 1,263,000
32 AC-WC Ton 1,200,000 1,283,000
HARGA HARGA
SATUAN SATUAN
NO URAIAN SATUAN
SEMESTER 1 SEMESTER 2
Rp. Rp.
S ACCESSORIES PIPA
1 Air valve DN 1/2" Buah 153,000 153,000
7 Bend All Flange CI Dn. 2" - 90 o Buah 222,000 222,000
8 Bend All Flange CI Dn. 3" - 90 o Buah 499,000 499,000
9 Bend All Flange CI Dn. 4" - 45 o Buah 585,000 585,000
10 Bend All Flange CI Dn. 4" - 90 o Buah 585,000 585,000
11 Bend All Flange CI.Dn. 2" - 45 Buah 222,000 222,000
12 Bend All Flange CI.Dn. 3" - 45 o Buah 499,000 499,000
17 Bend PVC SC SNI DN 2"-45° Buah 28,000 28,000
18 Bend PVC SC SNI DN 2"-90° Buah 33,000 33,000
19 Bend PVC SNI RRJ DN 3"-90° Buah 110,000 110,000
20 Bend Socket Spigot PVC. SNI. DN. 2" - 45 o Buah 13,000 13,000
21 Bend Socket Spigot PVC. SNI. DN. 2" - 90 o
Buah 39,000 39,000
22 Bend Socket Spigot PVC. SNI. DN. 3" - 90 o
Buah 46,000 46,000
23 Bentonite Kg 10,000 10,000
24 Bok Meter Set. 44,000 44,000
25 Cap PVC SC DN 1 1/2" Buah 24,000 24,000
26 Cap PVC SC DN 1" Buah 9,000 9,000
27 Cap PVC SC DN 1/2" Buah 3,000 3,000
28 Chek Valve DN 1 1/2" Buah 92,800 92,500
29 Chek Valve DN 2" Buah 219,000 219,000
51 Knie GIP DN 1,5" Buah 28,000 28,000
52 Knie GI DN 1/2" Buah 9,000 9,000
53 Knie GI DN 2" Buah 40,000 40,000
54 Knie GIP DN 3/4" Buah 10,000 10,000
55 Knie PVC SC DN 1 1/2" Buah 9,000 9,000
56 Knie PVC SC DN 1" Buah 4,000 4,000
57 Knie PVC SC DN 1/2" Buah 3,000 3,000
58 Knie PVC SC DN 2" Buah 23,000 23,000
59 Kran air DN 1/2" (besi) Buah 28,000 28,000
60 Kran air DN 3/4" (Besi) Buah 33,000 33,000
77 Seal tape Buah 2,000 2,000
80 Shock ND 3/4" Buah 4,000 4,000
81 Stop Kran KITZ DN 1" Buah 61,000 61,000
82 Stop Kran KITZ DN 1 1/2" Buah 328,000 328,000
83 Stop Kran KITZ DN 2" Buah 575,000 575,000
84 Stop Kran KITZ DN 3/4" Buah 48,000 48,000
91 Tee All Flange CI. Dn. 2 x 2" Buah 11,000 11,000
92 Tee All Flange CI. Dn. 3 x 2" Buah 9,000 9,000
93 Tee All Flange CI. Dn. 3 x 3" Buah 6,000 6,000
94 Tee All Flange CI. Dn. 4 x 2" Buah 26,000 26,000
95 Tee All Flange CI. Dn. 4 x 3" Buah 40,000 40,000
96 Tee All Flange CI. Dn. 4 x 4" Buah 120,000 120,000
97 Tee All Flange DN 2 X 2" Buah 60,000 60,000
98 Tee Drat GIP DN 1 1/2 X 1 1/2" Buah 16,000 16,000
99 Tee Drat GIP DN 2 X 2" Buah 53,000 53,000
100 Tee PVC SC DN 1 1/2 x 1 1/2" Buah 13,000 13,000
101 Tee PVC SC DN 1 1/2 x 1" Buah 17,000 17,000
107 Valve Socket PVC DN 1 1/2" Buah 11,000 11,000
108 Valve Socket PVC DN 1" Buah 2,000 2,000
109 Valve Socket PVC DN 2" Buah 17,000 17,000
110 Valve Socket PVC DN 3" Buah 38,000 38,000
HARGA HARGA
SATUAN SATUAN
NO URAIAN SATUAN
SEMESTER 1 SEMESTER 2
Rp. Rp.
T PENGEBORAN
1 Centraliser Bh 200,000 200,000
2 Depresiasi alat redeplopping unit 2,391,000 2,391,000
3 Depresiasi mixer unit 120,000 120,000
4 Depresiasi Peralatan logging unit 962,000 962,000
5 Depresiasi Peralatan mesin unit 722,000 722,000
6 Depresiasi Peralatan pengeboran unit 1,082,000 1,082,000
7 Depresiasi Pompa injeksi unit 481,000 481,000
8 Grevel M3 276,000 276,000
9 Kawat Las. RB. 26 kg 25,000 25,000
10 Kawat Las. RB. 32 kg 23,000 23,000
11 Liquid Oil Grundfose liter 290,000 290,000
12 Panel Pompa Unit 5,216,000 5,216,000
13 Tiang Kabel bh 841,000 841,000
126 Stang medium pipa 2 galvanis tebal 2,5 mm p= 1,5 m unit 465,000 525,000
127 Stang medium pipa 2 galvanis tebal 2,5 mm p= 2 m unit 580,000 675,000
128 Stang medium pipa 2 galvanis tebal 2,5 mm p= 3 m unit 70,000 825,000
129 Stang medium pipa 2 galvanis tebal 2,5 mm p= 4 m unit 825,000 925,000
130 Stang medium pipa 2 galvanis tebal 2,5 mm p= 6 m unit 930,000 975,000
131 Stang octagonal galvanis tebal 3,2 mm p = 1,5 m unit 850,000 850,000
132 Stang octagonal galvanis tebal 3,2 mm p = 2 m unit 1,055,000 1,055,000
133 Stang octagonal galvanis tebal 3,2 mm p = 3 m unit 1,235,000 1,235,000
134 Stang octagonal galvanis tebal 3,2 mm p = 4 m unit 1,455,000 1,455,000
135 Stang octagonal galvanis tebal 3,2 mm p =6 m unit 1,700,000 1,700,000
136 Strain Clamp Wedge Buah 18,000 18,000
137 T Dos Buah 5,400 10,750
139 Testpen Buah 16,500 16,500
HARGA HARGA
SATUAN SATUAN
NO URAIAN SATUAN
SEMESTER 1 SEMESTER 2
Rp. Rp.
Ungaran, 2018
KEPALA DINAS PEKERJAAN UMUM
KABUPATEN SEMARANG
HARGA HARGA
SATUAN SATUAN
NO URAIAN SATUAN
SEMESTER 1 SEMESTER 2
Rp. Rp.
KETERANGAN
6
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
PERHITUNGAN VOLUME
GAMBAR / SKETSA / DETAIL BANGUNAN / PEKERJAAN
PERHITUNGAN
PERHITUNGAN
PERHITUNGAN
= 17,445,546.00
PERHITUNGAN HARGA SATUAN PEKERJAAN (HSP)
A TENAGA
Pekerja L.02 OH 11.000 75,000.00 825,000.00
Mandor L.04 OH 1.400 100,000.00 140,000.00
JUMLAH TENAGA KERJA 965,000.00
B BAHAN
A TENAGA
Pekerja L.02 OH 9.190 75,000.00 689,250.00
Mandor L.03 OH 0.603 90,000.00 54,300.00
JUMLAH TENAGA KERJA 743,550.00
B BAHAN
A Tenaga
Pekerja L.02 OH 7.000 75,000.00 525,000.00
Mandor L.04 OH 0.033 100,000.00 3,330.00
JUMLAH TENAGA KERJA 528,330.00
B Bahan
D Jumlah A + B + C 886,800.00
E Overhead & Profit 15% x D 133,020.00
F Harga Satuan Pekerjaan (D+E) 1,019,820.00
A. 2.3.1.HARGA SATUAN PEKERJAAN TANAH
A. 2.3.1.1. Penggalian 1 m3 Tanah Biasa Sedalam 1 m 70,495.00
A TENAGA
Pekerja L.01 OH 0.784 75,000.00 58,800.00
Mandor L.04 OH 0.025 100,000.00 2,500.00
JUMLAH TENAGA KERJA 61,300.00
B BAHAN
D Jumlah A + B + C 61,300.00
E Overhead & Profit 15% x D 9,195.00
F Harga Satuan Pekerjaan (D+E) 70,495.00
A TENAGA
Pekerja L.01 OH 0.450 75,000.00 33,750.00
Mandor L.04 OH 0.010 100,000.00 1,000.00
JUMLAH TENAGA KERJA 34,750.00
B BAHAN
Pasir Urug m3 1.200 250,000.00 300,000.00
JUMLAH HARGA BAHAN 300,000.00
C PERALATAN
D Jumlah A + B + C 334,750.00
E Overhead & Profit 15% x D 50,212.50
F Harga Satuan Pekerjaan (D+E) 384,962.50
A TENAGA 19,125.00
Pekerja L.01 OH 0.250 67,500.00 16,875.00
Mandor L.04 OH 0.025 90,000.00 2,250.00
JUMLAH TENAGA KERJA 19,125.00
B BAHAN 81,000.00
JUMLAH HARGA BAHAN 81,000.00
Tanah Urug m3 1.200 67,500.00 81,000.00
C PERALATAN
D Jumlah A + B + C 100,125.00
E Overhead & Profit 15% x D 15,018.75
F Harga Satuan Pekerjaan (D+E) 115,143.75
A. 3.2.1.HARGA SATUAN PEKERJAAN PONDASI
A. 3.2.1.1. Pemasangan 1 m3 Pondasi Batu Belah Campuran 1 SP : 3PP 1,212,243.75
A. TENAGA
Pekerja L.01 OH 1.820 75,000.00 136,500.00
Tukang Batu L.02 OH 0.800 90,000.00 72,000.00
Kepala Tukang L.03 OH 0.075 95,000.00 7,125.00
Mandor L.04 OH 0.075 100,000.00 7,500.00
JUMLAH TENAGA KERJA 223,125.00
B BAHAN
Batu Belah 15/20 m3 1.200 360,000.00 432,000.00
Semen Kg 202.000 1,375.00 277,750.00
Pasir Pasang m3 0.485 250,000.00 121,250.00
JUMLAH HARGA BAHAN 831,000.00
C PERALATAN
A TENAGA
Pekerja L.01 OH 2.900 75,000.00 217,500.00
Tukang Batu L.02 OH 0.340 90,000.00 30,600.00
Kepala Tukang L.03 OH 0.032 95,000.00 3,040.00
Mandor L.04 OH 0.090 100,000.00 9,000.00
JUMLAH TENAGA KERJA 260,140.00
B BAHAN
Semen Kg 247.000 1,137.50 280,962.50
Pasir Beton Kg 869.000 244.29 212,284.29
Kerikil (maksimum 30 mm) Kg 999.000 220.00 219,780.00
Air ltr 215.000 72.00 15,480.00
JUMLAH HARGA BAHAN 728,506.79
C PERALATAN
D Jumlah A + B + C 988,646.79
E Overhead & Profit 15% x D 148,297.02
F Harga Satuan Pekerjaan (D+E) 1,136,943.80
A 4.1.1.7 Membuat 1 m3 Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 1,491,945.52
A TENAGA
Pekerja L.01 OH 2.340 75,000.00 175,500.00
Tukang Batu L.02 OH 1.200 90,000.00 108,000.00
Kepala Tukang L.03 OH 0.900 95,000.00 85,500.00
Mandor L.04 OH 0.900 100,000.00 90,000.00
JUMLAH TENAGA KERJA 459,000.00
B BAHAN
Semen Kg 371.000 1,137.50 422,012.50
Pasir Beton Kg 698.000 244.29 170,511.43
Kerikil (maksimum 30 mm) Kg 1,047.000 220.00 230,340.00
Air ltr 215.000 72.00 15,480.00
JUMLAH HARGA BAHAN 838,343.93
C PERALATAN
D Jumlah A + B + C 1,297,343.93
E Overhead & Profit 15% x D 194,601.59
F Harga Satuan Pekerjaan (D+E) 1,491,945.52
A 4.1.1.18 Pembesian 1m3 dengan Besi Polos 1,640,015.00
A TENAGA
Pekerja L.01 OH 5.150 75,000.00 386,250.00
Tukang Besi L.02 OH 0.580 90,000.00 52,200.00
Kepala Tukang L.03 OH 0.070 95,000.00 6,650.00
Mandor L.04 OH 0.040 100,000.00 4,000.00
449,100.00
B BAHAN
Besi Beton (polos/ulir) Kg 95.000 10,000.00 950,000.00
Kawat Beton Kg 1.500 18,000.00 27,000.00
JUMLAH HARGA BAHAN 977,000.00
C PERALATAN
D Jumlah A + B + C 1,426,100.00
E Overhead & Profit 15% x D 213,915.00
F Harga Satuan Pekerjaan (D+E) 1,640,015.00
A TENAGA
Pekerja L.01 OH 0.679 75,000.00 50,925.00
Tukang Kayu L.02 OH 0.330 90,000.00 29,700.00
Kepala Tukang L.03 OH 0.033 95,000.00 3,135.00
Mandor L.04 OH 0.033 100,000.00 3,300.00
JUMLAH TENAGA KERJA 87,060.00
B BAHAN
Kayu Klas III (Terentang) m3 0.020 2,700,000.00 54,000.00
Paku Biasa 2" - 5" Kg 0.400 13,500.00 5,400.00
Minyak Bekisting Ltr 0.200 27,000.00 5,400.00
Balok Kayu Klas II m3 0.008 7,650,000.00 57,375.00
Plywood tebal 9mm Lbr 0.175 99,000.00 17,325.00
Dolken Kayu Galam diameter 8 - 10 cm / 4 m Btg 3.000 15,750.00 47,250.00
JUMLAH HARGA BAHAN 186,750.00
C PERALATAN
D Jumlah A + B + C 273,810.00
E Overhead & Profit 15% x D 41,071.50
F Harga Satuan Pekerjaan (D+E) 314,881.50
A. 4.2.1.HARGA SATUAN PEKERJAAN BESI & ALLUMUNIUM
A. 4.2.1.1 Pemasangan 1 kg Besi Profil 26,620.20
A TENAGA
Pekerja L.01 OH 0.060 67,500.00 4,050.00
Tukang Besi L.02 OH 0.060 81,000.00 4,860.00
Kepala Tukang L.03 OH 0.006 85,500.00 513.00
Mandor L.04 OH 0.003 90,000.00 270.00
JUMLAH TENAGA KERJA 9,693.00
B BAHAN
Besi Profil Kg 1.150 11,700.00 13,455.00
JUMLAH HARGA BAHAN 13,455.00
C PERALATAN
D Jumlah A + B + C 23,148.00
E Overhead & Profit 15% x D 3,472.20
F Harga Satuan Pekerjaan (D+E) 26,620.20
A TENAGA
Pekerja L.01 OH 0.060 67,500.00 4,050.00
Tukang Besi L.02 OH 0.060 81,000.00 4,860.00
Kepala Tukang L.03 OH 0.006 85,500.00 513.00
Mandor L.04 OH 0.003 90,000.00 270.00
JUMLAH TENAGA KERJA 9,693.00
B BAHAN
Besi Baja IWF kg 1.150 11,700.00 13,455.00
JUMLAH HARGA BAHAN 13,455.00
C PERALATAN
D Jumlah A + B + C 23,148.00
E Overhead & Profit 15% x D 3,472.20
F Harga Satuan Pekerjaan (D+E) 26,620.20
A TENAGA
Pekerja L.01 OH 0.100 67,500.00 6,750.00
Tukang Besi L.02 OH 0.100 81,000.00 8,100.00
Kepala Tukang L.03 OH 0.001 85,500.00 85.50
Mandor L.04 OH 0.005 90,000.00 450.00
JUMLAH TENAGA KERJA 15,385.50
B BAHAN
Solar ltr 1.000 8,100.00 8,100.00
Minyak Pelumas ltr 0.100 27,000.00 2,700.00
JUMLAH HARGA BAHAN 10,800.00
C PERALATAN
Sewa Alat jam 0.800 144,000.00 115,200.00
JUMLAH HARGA ALAT 115,200.00
D Jumlah A + B + C 141,385.50
E Overhead & Profit 15% x D 21,207.83
F Harga Satuan Pekerjaan (D+E) 162,593.33
A. 4.2.1.4 Pembuatan 1 m2 Pintu Besi Plat Baja tebal 2 mm rangkap, rangka baja Siku 839,493.68
A TENAGA
Pekerja L.01 OH 1.050 67,500.00 70,875.00
Tukang Besi L.02 OH 1.050 81,000.00 85,050.00
Kepala Tukang L.03 OH 0.105 85,500.00 8,977.50
Mandor L.04 OH 0.052 90,000.00 4,680.00
JUMLAH TENAGA KERJA 169,582.50
B BAHAN
Besi Siku L.30.30.3 Kg 15.000 11,700.00 175,500.00
Besi Plat Baja Kg 32.800 11,700.00 383,760.00
Kawat Las Kg 0.050 23,040.00 1,152.00
JUMLAH HARGA BAHAN 560,412.00
C PERALATAN
D Jumlah A + B + C 729,994.50
E Overhead & Profit 15% x D 109,499.18
F Harga Satuan Pekerjaan (D+E) 839,493.68
A TENAGA
Pekerja L.01 OH 0.040 67,500.00 2,700.00
Tukang Besi L.02 OH 0.020 81,000.00 1,620.00
Kepala Tukang L.03 OH 0.002 85,500.00 171.00
Mandor L.04 OH 0.002 90,000.00 180.00
JUMLAH TENAGA KERJA 4,671.00
B BAHAN
Kawat Las kg 0.400 23,040.00 9,216.00
Solar ltr 0.300 8,100.00 2,430.00
Minyak Pelumas ltr 0.040 27,000.00 1,080.00
JUMLAH HARGA BAHAN 12,726.00
C PERALATAN
Sewa Alat jam 0.170 144,000.00 24,480.00
JUMLAH HARGA ALAT 24,480.00
D Jumlah A + B + C 41,877.00
E Overhead & Profit 15% x D 6,281.55
F Harga Satuan Pekerjaan (D+E) 48,158.55
A TENAGA
Pekerja L.01 OH 1.200 67,500.00 81,000.00
Tukang Besi L.02 OH 1.200 81,000.00 97,200.00
Kepala Tukang L.03 OH 0.120 85,500.00 10,260.00
Mandor L.04 OH 0.006 90,000.00 540.00
JUMLAH TENAGA KERJA 189,000.00
B BAHAN
Pintu Gulung Besi m2 1.000 94,500.00 94,500.00
JUMLAH HARGA BAHAN 94,500.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah A + B + C 283,500.00
E Overhead & Profit 15% x D 42,525.00
F Harga Satuan Pekerjaan (D+E) 326,025.00
A TENAGA
Pekerja L.01 OH 0.440 67,500.00 29,700.00
Tukang Besi L.02 OH 0.440 81,000.00 35,640.00
Kepala Tukang L.03 OH 0.044 85,500.00 3,762.00
Mandor L.04 OH 0.022 90,000.00 1,980.00
JUMLAH TENAGA KERJA 71,082.00
B BAHAN
Pintu Lipat m2 1.000 495,000.00 495,000.00
JUMLAH HARGA BAHAN 495,000.00
C PERALATAN
D Jumlah A + B + C 566,082.00
E Overhead & Profit 15% x D 84,912.30
F Harga Satuan Pekerjaan (D+E) 650,994.30
A TENAGA
Pekerja L.01 OH 0.080 67,500.00 5,400.00
Tukang Besi L.02 OH 0.800 81,000.00 64,800.00
Kepala Tukang L.03 OH 0.080 85,500.00 6,840.00
Mandor L.04 OH 0.004 90,000.00 360.00
JUMLAH TENAGA KERJA 77,400.00
B BAHAN
Sunscreen Allumunium m2 1.000 326,700.00 326,700.00
JUMLAH HARGA BAHAN 326,700.00
C PERALATAN
D Jumlah A + B + C 404,100.00
E Overhead & Profit 15% x D 60,615.00
F Harga Satuan Pekerjaan (D+E) 464,715.00
A TENAGA
Pekerja L.01 OH 1.000 67,500.00 67,500.00
Tukang Besi L.02 OH 1.000 81,000.00 81,000.00
Kepala Tukang L.03 OH 0.100 85,500.00 8,550.00
Mandor L.04 OH 0.050 90,000.00 4,500.00
JUMLAH TENAGA KERJA 161,550.00
B BAHAN
Rolling Allumunium m2 1.000 292,500.00 292,500.00
JUMLAH HARGA BAHAN 292,500.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah A + B + C 454,050.00
E Overhead & Profit 15% x D 68,107.50
F Harga Satuan Pekerjaan (D+E) 522,157.50
A TENAGA
Pekerja L.01 OH 0.043 67,500.00 2,902.50
Tukang Besi L.02 OH 0.043 81,000.00 3,483.00
Kepala Tukang L.03 OH 0.004 85,500.00 367.65
Mandor L.04 OH 0.002 90,000.00 189.00
JUMLAH TENAGA KERJA 6,942.15
B BAHAN
Profil Allumunium m' 1.100 84,150.00 92,565.00
Skrup Fixer buah 2.000 900.00 1,800.00
Sealant Tube 0.060 51,750.00 3,105.00
JUMLAH HARGA BAHAN 97,470.00
C PERALATAN
D Jumlah A + B + C 104,412.15
E Overhead & Profit 15% x D 15,661.82
F Harga Satuan Pekerjaan (D+E) 120,073.97
A TENAGA
Pekerja L.01 OH 0.085 67,500.00 5,737.50
Tukang Besi L.02 OH 0.085 81,000.00 6,885.00
Kepala Tukang L.03 OH 0.009 85,500.00 726.75
Mandor L.04 OH 0.004 90,000.00 378.00
JUMLAH TENAGA KERJA 13,727.25
B BAHAN
Profil Allumunium m' 4.400 84,150.00 370,260.00
Allumunium Strip m' 14.600 4,500.00 65,700.00
JUMLAH HARGA BAHAN 435,960.00
C PERALATAN
D Jumlah A + B + C 449,687.25
E Overhead & Profit 15% x D 67,453.09
F Harga Satuan Pekerjaan (D+E) 517,140.34
A TENAGA
Pekerja L.01 OH 0.085 67,500.00 5,737.50
Tukang Besi L.02 OH 0.085 81,000.00 6,885.00
Kepala Tukang L.03 OH 0.009 85,500.00 769.50
Mandor L.04 OH 0.005 90,000.00 450.00
JUMLAH TENAGA KERJA 13,842.00
B BAHAN
Pintu Allumunium m' 4.400 84,150.00 370,260.00
Profil Kaca m' 4.500 5,400.00 24,300.00
Sealant tube 0.270 51,750.00 13,972.50
JUMLAH HARGA BAHAN 408,532.50
C PERALATAN
D Jumlah A + B + C 422,374.50
E Overhead & Profit 15% x D 63,356.18
F Harga Satuan Pekerjaan (D+E) 485,730.68
A TENAGA
Pekerja L.01 OH 0.350 67,500.00 23,625.00
Tukang Besi L.02 OH 0.350 81,000.00 28,350.00
Kepala Tukang L.03 OH 0.035 85,500.00 2,992.50
Mandor L.04 OH 0.018 90,000.00 1,620.00
JUMLAH TENAGA KERJA 56,587.50
B BAHAN
Venetions Blinds atau Vertical Blinds (tirai) m2 1.000 90,000.00 90,000.00
JUMLAH HARGA BAHAN 90,000.00
C PERALATAN
D Jumlah A + B + C 146,587.50
E Overhead & Profit 15% x D 21,988.13
F Harga Satuan Pekerjaan (D+E) 168,575.63
A TENAGA
Pekerja L.01 OH 1.670 67,500.00 112,725.00
Tukang Las L.02 OH 1.670 81,000.00 135,270.00
Kepala Tukang L.03 OH 0.167 85,500.00 14,278.50
Mandor L.04 OH 0.083 90,000.00 7,470.00
JUMLAH TENAGA KERJA 269,743.50
B BAHAN
Besi Strip 2x3 m' 6.177 11,700.00 72,270.90
Pengelasan cm 27.080 4,815.86 130,413.35
JUMLAH HARGA BAHAN 202,684.25
C PERALATAN
D Jumlah A + B + C 472,427.75
E Overhead & Profit 15% x D 70,864.16
F Harga Satuan Pekerjaan (D+E) 543,291.92
A TENAGA
Pekerja L.01 OH 0.100 67,500.00 6,750.00
Tukang Kayu L.02 OH 0.100 81,000.00 8,100.00
Kepala Tukang L.03 OH 0.010 85,500.00 855.00
Mandor L.04 OH 0.005 90,000.00 450.00
JUMLAH TENAGA KERJA 16,155.00
B BAHAN
Kawat Nyamuk nylon m2 1.100 9,900.00 10,890.00
Pengelasan cm 11.110 4,815.86 53,504.15
Baja Strip (0,2x2) cm kg 1.716 11,700.00 20,077.20
JUMLAH HARGA BAHAN 84,471.35
C PERALATAN
D Jumlah A + B + C 100,626.35
E Overhead & Profit 15% x D 15,093.95
F Harga Satuan Pekerjaan (D+E) 115,720.30
A TENAGA
Pekerja L.01 OH 0.200 67,500.00 13,500.00
Tukang Kayu L.02 OH 0.200 81,000.00 16,200.00
Kepala Tukang L.03 OH 0.020 85,500.00 1,710.00
Mandor L.04 OH 0.001 90,000.00 90.00
JUMLAH TENAGA KERJA 31,500.00
B BAHAN
Jendela Nako m2 1.100 15,750.00 17,325.00
Paku Skrup 1 - 2,5 cm buah 10.000 10,350.00 103,500.00
Besi Strip m' 7.000 11,700.00 81,900.00
JUMLAH HARGA BAHAN 202,725.00
C PERALATAN
D Jumlah A + B + C 234,225.00
E Overhead & Profit 15% x D 35,133.75
F Harga Satuan Pekerjaan (D+E) 269,358.75
A TENAGA
Pekerja L.01 OH 0.200 67,500.00 13,500.00
Tukang Kayu L.02 OH 0.200 81,000.00 16,200.00
Kepala Tukang L.03 OH 0.020 85,500.00 1,710.00
Mandor L.04 OH 0.001 90,000.00 90.00
JUMLAH TENAGA KERJA 31,500.00
B BAHAN
Seng Plaat Lbr 1.050 22,320.00 23,436.00
Paku Biasa 1 - 2,5 cm Kg 0.015 13,500.00 202.50
Kayu Papan Klas II atau III m3 0.019 7,020,000.00 133,380.00
JUMLAH HARGA BAHAN 157,018.50
C PERALATAN
D Jumlah A + B + C 188,518.50
E Overhead & Profit 15% x D 28,277.78
F Harga Satuan Pekerjaan (D+E) 216,796.28
A. 4.2.1.19 Pemasangan 1 m Talang 1/2 Lingkaran Ø 15 cm, Seng Plaat BJLS 30 Lebar 45 cm 77,200.65
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.150 67,500.00 10,125.00
Tukang Kayu L.02 OH 0.300 81,000.00 24,300.00
Kepala Tukang L.03 OH 0.030 85,500.00 2,565.00
Mandor L.04 OH 0.008 90,000.00 720.00
JUMLAH TENAGA KERJA 37,710.00
B BAHAN
Seng Plaat Lbr 1.050 22,320.00 23,436.00
Paku Biasa 1 - 2,5 cm Kg 0.010 13,500.00 135.00
Besi strip Kg 0.500 11,700.00 5,850.00
JUMLAH HARGA BAHAN 29,421.00
C PERALATAN
D Jumlah A + B + C 67,131.00
E Overhead & Profit 15% x D 10,069.65
F Harga Satuan Pekerjaan (D+E) 77,200.65
A. 4.2.1.20 Pemasangan 1 m2 rangka hollow 1x40.40 mm, modul 60 x 120 cm dinding partisi 85,348.69
A TENAGA
Pekerja L.01 OH 0.250 67,500.00 16,875.00
Tukang besi L.02 OH 0.250 81,000.00 20,250.00
Kepala Tukang L.03 OH 0.025 85,500.00 2,137.50
Mandor L.04 OH 0.013 90,000.00 1,170.00
JUMLAH TENAGA KERJA 40,432.50
B BAHAN
Rangka metal hollow 40.40 mm m' 3.500 7,425.00 25,987.50
Assesories (perkuatan, las dll) Ls 0.300 25,987.50 7,796.25
JUMLAH HARGA BAHAN 33,783.75
C PERALATAN
D Jumlah A + B + C 74,216.25
E Overhead & Profit 15% x D 11,132.44
F Harga Satuan Pekerjaan (D+E) 85,348.69
A. 4.2.1.21 Pemasangan 1 m2 rangka hollow 1x40.40 mm, modul 60 x 60 cm, plafon 109,477.13
A TENAGA
Pekerja L.01 OH 0.350 67,500.00 23,625.00
Tukang besi L.02 OH 0.350 81,000.00 28,350.00
Kepala Tukang L.03 OH 0.035 85,500.00 2,992.50
Mandor L.04 OH 0.018 90,000.00 1,620.00
JUMLAH TENAGA KERJA 56,587.50
B BAHAN
Rangka metal hollow 40.40 mm m' 4.000 7,425.00 29,700.00
Assesories (perkuatan, las dll) Ls 0.300 29,700.00 8,910.00
JUMLAH HARGA BAHAN 38,610.00
C PERALATAN
D Jumlah A + B + C 95,197.50
E Overhead & Profit 15% x D 14,279.63
F Harga Satuan Pekerjaan (D+E) 109,477.13
A TENAGA
B BAHAN
C PERALATAN
D Jumlah A + B + C 119,261.25
E Overhead & Profit 15% x D 17,889.19
F Harga Satuan Pekerjaan (D+E) 137,150.44
A. 4.4.1.HARGA SATUAN PEKERJAAN PASANGAN DINDING
A. 4.4.1.10 Pemasangan 1 m2 Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP 130,704.40
A TENAGA
Pekerja L.01 OH 0.300 67,500.00 20,250.00
Tukang Batu L.02 OH 0.100 81,000.00 8,100.00
Kepala Tukang Batu L.03 OH 0.010 85,500.00 855.00
Mandor L.04 OH 0.015 90,000.00 1,350.00
JUMLAH TENAGA KERJA 30,555.00
B BAHAN
Bata Merah 5 x 11 x 22 Buah 70.000 810.00 56,700.00
Semen Kg 9.680 1,137.50 11,011.00
Pasir Pasang m3 0.045 342,000.00 15,390.00
JUMLAH HARGA BAHAN 83,101.00
C PERALATAN
D Jumlah A + B + C 113,656.00
E Overhead & Profit 15% x D 17,048.40
F Harga Satuan Pekerjaan (D+E) 130,704.40
A. 4.4.2.HARGA SATUAN PEKERJAAN PLESTERAN
A TENAGA
Pekerja L.01 OH 0.430 75,000.00 32,250.00
Tukang batu L.02 OH 0.200 90,000.00 18,000.00
Kepala Tukang L.03 OH 0.020 95,000.00 1,900.00
Mandor L.04 OH 0.022 100,000.00 2,200.00
JUMLAH TENAGA KERJA 54,350.00
B BAHAN
Semen Kg 8.550 1,200.00 10,260.00
Pasir Pasang m3 0.052 342,000.00 17,784.00
JUMLAH HARGA BAHAN 28,044.00
C PERALATAN
D Jumlah A + B + C 82,394.00
E Overhead & Profit 15% x D 12,359.10
F Harga Satuan Pekerjaan (D+E) 94,753.10
A TENAGA
Pekerja L.01 OH 0.430 75,000.00 32,250.00
Tukang batu L.02 OH 0.100 90,000.00 9,000.00
Kepala Tukang L.03 OH 0.010 95,000.00 950.00
Mandor L.04 OH 0.010 100,000.00 1,000.00
JUMLAH TENAGA KERJA 43,200.00
B BAHAN
Semen Kg 3.250 1,200.00 3,900.00
JUMLAH HARGA BAHAN 3,900.00
C PERALATAN
D Jumlah A + B + C 47,100.00
E Overhead & Profit 15% x D 7,065.00
F Harga Satuan Pekerjaan (D+E) 54,165.00
A.4.4.3 A. 4.4.3.HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN DINDING
A.4.4.3.9 A. 4.4.3.13.a Pemasangan 1 m2 lantai Keramik Uk. 60 x 60 cm
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.240 67,500.00
Tukang Batu L.02 OH 0.120 81,000.00
Kepala Tukang L.03 OH 0.012 85,500.00
Mandor L.04 OH 0.012 90,000.00
JUMLAH TENAGA KERJA
B BAHAN
Ubin Keramik 60x60 cm Buah 3.100 57,600.00
Semen Kg 9.600 1,137.50
Semen warna Kg 1.500 2,250.00
Pasir Pasang m3 0.045 342,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.700 67,500.00
Tukang Batu L.02 OH 0.350 81,000.00
Kepala Tukang L.03 OH 0.035 85,500.00
Mandor L.04 OH 0.035 90,000.00
JUMLAH TENAGA KERJA
B BAHAN
Ubin Keramik 30 x 30 cm Buah 11.870 3,564.00
Semen Kg 10.000 1,137.50
Pasir Pasang m3 0.045 342,000.00
Semen Warna Kg 1.500 2,250.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.700 67,500.00
Tukang Batu L.02 OH 0.350 81,000.00
Kepala Tukang L.03 OH 0.035 85,500.00
Mandor L.04 OH 0.035 90,000.00
JUMLAH TENAGA KERJA
B BAHAN
Ubin Keramik 20 x 20 cm Buah 26.500 2,052.00
Semen Kg 10.400 1,137.50
Semen Warna Kg 1.620 2,250.00
Pasir Pasang m3 0.045 342,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.700 67,500.00
Kepala Tukang L.03 OH 0.035 85,500.00
Mandor L.04 OH 0.035 90,000.00
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)
A.4.4.3.37 A. 4.4.3.37 Pemasangan 1 m2 Lantai Keramik uk.10 x 33 cm, untuk variasi / border
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.050 67,500.00
Tukang Batu L.02 OH 0.525 81,000.00
Kepala Tukang L.03 OH 0.053 85,500.00
Mandor L.04 OH 0.035 90,000.00
JUMLAH TENAGA KERJA
B BAHAN
Ubin Keramik Buah 33.000 4,050.00
Semen Kg 9.800 1,137.50
Semen Warna Kg 4.370 2,250.00
Pasir Pasang m3 0.045 342,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.090 75,000.00
Tukang Batu L.02 OH 0.090 90,000.00
Kepala Tukang L.03 OH 0.035 95,000.00
Mandor L.04 OH 0.005 100,000.00
JUMLAH TENAGA KERJA
B BAHAN
Ubin Keramik Buah 5.300 5,500.00
Semen Kg 1.140 1,137.50
Pasir Pasang m3 0.003 342,000.00
Semen Warna Kg 0.025 2,250.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.090 67,500.00
Tukang Batu L.02 OH 0.090 81,000.00
Kepala Tukang L.03 OH 0.035 85,500.00
Mandor L.04 OH 0.005 90,000.00
JUMLAH TENAGA KERJA
B BAHAN
Ubin Keramik Buah 10.600 5,500.00
Semen Kg 1.140 1,137.50
Pasir Pasang m3 0.003 342,000.00
Semen Warna Kg 0.050 2,250.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.090 67,500.00
Tukang Batu L.02 OH 0.090 81,000.00
Kepala Tukang L.03 OH 0.035 85,500.00
Mandor L.04 OH 0.005 90,000.00
JUMLAH TENAGA KERJA
B BAHAN
Ubin Keramik Buah 5.300 4,050.00
Semen Kg 0.570 1,137.50
Pasir Pasang m3 0.002 342,000.00
Semen Warna Kg 0.013 2,250.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)
A.4.4.3.43 A. 4.4.3.43 Pemasangan 1 m' Lantai Marmer Ukuran 100x100 cm
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.700 67,500.00
Tukang Batu L.02 OH 0.350 81,000.00
Kepala Tukang L.03 OH 0.035 85,500.00
Mandor L.04 OH 0.035 90,000.00
JUMLAH TENAGA KERJA
B BAHAN
Marmer buah 1.060 1,755,000.00
Semen kg 8.190 1,137.50
Pasir Pasang m3 0.045 342,000.00
Semen Warna kg 0.650 2,250.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.170 67,500.00
Tukang Batu L.02 OH 0.170 81,000.00
Kepala Tukang L.03 OH 0.017 85,500.00
Mandor L.04 OH 0.009 90,000.00
JUMLAH TENAGA KERJA
B BAHAN
Karpet m2 1.050 117,000.00
Lem kg 0.350 34,200.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.700 67,500.00
Tukang Batu L.02 OH 0.350 81,000.00
Kepala Tukang L.03 OH 0.035 85,500.00
Mandor L.04 OH 0.035 90,000.00
JUMLAH TENAGA KERJA
B BAHAN
Parquet Jati m2 1.050 189,000.00
Lem Vynil Kg 0.600 34,200.00
JUMLAH HARGA BAHAN
C PERALATAN
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.000 67,500.00
Tukang Batu L.02 OH 0.500 81,000.00
Kepala Tukang L.03 OH 0.050 85,500.00
Mandor L.04 OH 0.050 90,000.00
JUMLAH TENAGA KERJA
B BAHAN
Porselen bh 86.000 536.59
Semen 82.6446280992 Kg 9.300 1,137.50
Semen Warna 0.0121 Kg 1.500 2,250.00
Pasir Pasang 0.11 m3 0.018 342,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.900 67,500.00
Tukang Batu L.02 OH 0.450 81,000.00
Kepala Tukang L.03 OH 0.045 85,500.00
Mandor L.04 OH 0.045 90,000.00
JUMLAH TENAGA KERJA
B BAHAN
Keramik Buah 53.000 1,017.00
Semen Kg 9.300 1,137.50
Pasir Pasang m3 0.018 342,000.00
Semen Warna Kg 2.750 2,250.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.900 67,500.00
Tukang Batu L.02 OH 0.450 81,000.00
Kepala Tukang L.03 OH 0.045 85,500.00
Mandor L.04 OH 0.045 90,000.00
JUMLAH TENAGA KERJA
B BAHAN
Keramik Buah 26.000 2,106.00
Semen Kg 9.300 1,137.50
Pasir Pasang m3 0.018 342,000.00
Semen Warna Kg 1.940 2,250.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.900 67,500.00
Tukang Batu L.02 OH 0.450 81,000.00
Kepala Tukang L.03 OH 0.045 85,500.00
Mandor L.04 OH 0.045 90,000.00
JUMLAH TENAGA KERJA
B BAHAN
Keramik Buah 53.000 1,017.00
Semen Kg 9.300 1,137.50
Pasir Pasang m3 0.018 342,000.00
Semen Warna Kg 2.750 2,250.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.900 67,500.00
Tukang Batu L.02 OH 0.450 81,000.00
Kepala Tukang L.03 OH 0.045 85,500.00
Mandor L.04 OH 0.045 90,000.00
JUMLAH TENAGA KERJA
B BAHAN
Keramik Buah 26.500 2,106.00
Semen Kg 9.300 1,137.50
Pasir Pasang m3 0.018 342,000.00
Semen Warna Kg 1.940 2,250.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.300 67,500.00
Tukang Batu L.02 OH 0.650 81,000.00
Kepala Tukang L.03 OH 0.065 85,500.00
Mandor L.04 OH 0.065 90,000.00
JUMLAH TENAGA KERJA
B BAHAN
Marmer buah 1.060 1,755,000.00
Paku 12 cm buah 3.030 225.00
Portlan Semen kg 12.440 1,137.50
Pasir Pasang m3 0.025 342,000.00
Semen Warna kg 0.650 2,250.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.700 67,500.00
Tukang Batu L.02 OH 0.350 81,000.00
Kepala Tukang L.03 OH 0.035 85,500.00
Mandor L.04 OH 0.035 90,000.00
JUMLAH TENAGA KERJA
B BAHAN
Batu Paros m2 1.100 117,000.00
Semen Kg 11.750 1,137.50
Pasir Pasang m3 0.035 342,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA A
Pekerja L.01 OH 0.150 67,500.00
Tukang Batu L.02 OH 0.150 81,000.00
Kepala Tukang L.03 OH 0.015 85,500.00
Mandor L.04 OH 0.008 90,000.00
JUMLAH TENAGA KERJA
B BAHAN
Vynil bh 11.870 40,095.00
Lem kg 0.350 34,200.00
D Jumlah A + B + C
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.120 67,500.00
Tukang Batu L.02 OH 0.120 81,000.00
Kepala Tukang L.03 OH 0.012 85,500.00
Mandor L.04 OH 0.006 90,000.00
JUMLAH TENAGA KERJA
B BAHAN
Papan Kayu Klas II m3 0.003 11,700,000.00
Paku Sekrup 5 cm kg 0.050 10,350.00
D Jumlah A + B + C
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.700 75,000.00
Tukang Batu L.02 OH 0.450 90,000.00
Kepala Tukang L.03 OH 0.035 95,000.00
Mandor L.04 OH 0.070 100,000.00
JUMLAH TENAGA KERJA
B BAHAN
Ubin keramik 40 x 40 (motif) m2 1.000 90,000.00
Semen Kg 8.190 1,137.50
Pasir Pasang m3 0.045 342,000.00
Semen Warna Kg 1.620 11,550.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.700 67,500.00
Tukang Batu L.02 OH 0.350 81,000.00
Kepala Tukang L.03 OH 0.035 85,500.00
Mandor L.04 OH 0.035 90,000.00
JUMLAH TENAGA KERJA
B BAHAN
Ubin keramik 40 x 40 (polos) Buah 7.000 8,250.00
Semen Kg 8.190 1,137.50
Pasir Pasang m3 0.045 342,000.00
Semen Warna Kg 1.620 2,250.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.900 67,500.00
Tukang Batu L.02 OH 0.450 81,000.00
Kepala Tukang L.03 OH 0.045 85,500.00
Mandor L.04 OH 0.045 90,000.00
JUMLAH TENAGA KERJA
B BAHAN
Keramik Buah 22.000 2,587.50
Semen Kg 9.300 1,137.50
Pasir Pasang m3 0.018 342,000.00
Semen Warna Kg 1.940 2,250.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)
271,711.65
Jumlah Harga
(Rp.)
16,200.00
9,720.00
1,026.00
1,080.00
28,026.00
178,560.00
10,920.00
3,375.00
15,390.00
208,245.00
236,271.00
35,440.65
271,711.65
177,315.26
Jumlah Harga
(Rp.)
47,250.00
28,350.00
2,992.50
3,150.00
81,742.50
42,304.68
11,375.00
15,390.00
3,375.00
72,444.68
154,187.18
23,128.08
177,315.26
192,033.33
Jumlah Harga
(Rp.)
47,250.00
28,350.00
2,992.50
3,150.00
81,742.50
54,378.00
11,830.00
3,645.00
15,390.00
85,243.00
166,985.50
25,047.83
192,033.33
61,401.38
Jumlah Harga
(Rp.)
47,250.00
2,992.50
3,150.00
53,392.50
53,392.50
8,008.88
61,401.38
334,766.73
Jumlah Harga
(Rp.)
70,875.00
42,525.00
4,531.50
3,150.00
121,081.50
133,650.00
11,147.50
9,832.50
15,390.00
170,020.00
291,101.50
43,665.23
334,766.73
57,734.60
Jumlah Harga
(Rp.)
6,750.00
8,100.00
3,325.00
500.00
18,675.00
29,150.00
1,296.75
1,026.00
56.25
31,529.00
50,204.00
7,530.60
57,734.60
89,174.16
Jumlah Harga
(Rp.)
6,075.00
7,290.00
2,992.50
450.00
16,807.50
58,300.00
1,296.75
1,026.00
112.50
60,735.25
77,542.75
11,631.41
89,174.16
45,382.59
Jumlah Harga
(Rp.)
6,075.00
7,290.00
2,992.50
450.00
16,807.50
21,465.00
648.38
513.00
29.25
22,655.63
39,463.13
5,919.47
45,382.59
2,263,442.79
Jumlah Harga
(Rp.)
47,250.00
28,350.00
2,992.50
3,150.00
81,742.50
1,860,300.00
9,316.13
15,390.00
1,462.50
1,886,468.63
1,968,211.13
295,231.67
2,263,442.79
186,677.78
Jumlah Harga
(Rp.)
11,475.00
13,770.00
1,453.50
810.00
27,508.50
122,850.00
11,970.00
134,820.00
162,328.50
24,349.28
186,677.78
345,819.38
Jumlah Harga
(Rp.)
47,250.00
28,350.00
2,992.50
3,150.00
81,742.50
198,450.00
20,520.00
218,970.00
-
300,712.50
45,106.88
345,819.38
210,485.76
Jumlah Harga
(Rp.)
67,500.00
40,500.00
4,275.00
4,500.00
116,775.00
46,146.34
10,578.75
3,375.00
6,156.00
66,256.09
183,031.09
27,454.66
210,485.76
209,208.86
Jumlah Harga
(Rp.)
60,750.00
36,450.00
3,847.50
4,050.00
105,097.50
53,901.00
10,578.75
6,156.00
6,187.50
76,823.25
181,920.75
27,288.11
209,208.86
208,096.24
Jumlah Harga
(Rp.)
60,750.00
36,450.00
3,847.50
4,050.00
105,097.50
54,756.00
10,578.75
6,156.00
4,365.00
75,855.75
180,953.25
27,142.99
208,096.24
209,208.86
Jumlah Harga
(Rp.)
60,750.00
36,450.00
3,847.50
4,050.00
105,097.50
53,901.00
10,578.75
6,156.00
6,187.50
76,823.25
181,920.75
27,288.11
209,208.86
209,307.19
Jumlah Harga
(Rp.)
60,750.00
36,450.00
3,847.50
4,050.00
105,097.50
55,809.00
10,578.75
6,156.00
4,365.00
76,908.75
182,006.25
27,300.94
209,307.19
2,342,495.09
Jumlah Harga
(Rp.)
87,750.00
52,650.00
5,557.50
5,850.00
151,807.50
1,860,300.00
681.75
14,150.50
8,550.00
1,462.50
1,885,144.75
2,036,952.25
305,542.84
2,342,495.09
271,144.84
Jumlah Harga
(Rp.)
47,250.00
28,350.00
2,992.50
3,150.00
81,742.50
128,700.00
13,365.63
11,970.00
154,035.63
235,778.13
35,366.72
271,144.84
588,949.67
Jumlah Harga
(Rp.)
10,125.00
12,150.00
1,282.50
675.00
24,232.50
475,927.65
11,970.00
487,897.65
-
512,130.15
76,819.52
588,949.67
63,254.03
Jumlah Harga
(Rp.)
8,100.00
9,720.00
1,026.00
540.00
19,386.00
35,100.00
517.50
35,617.50
55,003.50
8,250.53
63,254.03
272,253.44
Jumlah Harga
(Rp.)
52,500.00
40,500.00
3,325.00
7,000.00
103,325.00
90,000.00
9,316.13
15,390.00
18,711.00
133,417.13
236,742.13
35,511.32
272,253.44
193,020.17
Jumlah Harga
(Rp.)
47,250.00
28,350.00
2,992.50
3,150.00
81,742.50
57,750.00
9,316.13
15,390.00
3,645.00
86,101.13
167,843.63
25,176.54
193,020.17
210,590.59
Jumlah Harga
(Rp.)
60,750.00
36,450.00
3,847.50
4,050.00
105,097.50
56,925.00
10,578.75
6,156.00
4,365.00
78,024.75
183,122.25
27,468.34
210,590.59
A. 5.1.1.HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG
A. 5.1.1.1 Pemasangan 1 buah Closet Duduk / Mono Blok 2,326,570.75
A TENAGA
Pekerja L.01 OH 3.300 67,500.00 222,750.00
Tukang Batu L.02 OH 1.100 81,000.00 89,100.00
Kepala Tukang L.03 OH 0.010 85,500.00 855.00
Mandor L.04 OH 0.160 90,000.00 14,400.00
JUMLAH TENAGA KERJA 327,105.00
B BAHAN
Kloset Duduk / Monoblok Buah 1.000 1,600,000.00 1,600,000.00
Kelengkapan 6% dari harga Kloset Buah 0.060 1,600,000.00 96,000.00
JUMLAH HARGA BAHAN 1,696,000.00
C PERALATAN
D Jumlah A + B + C 2,023,105.00
E Overhead & Profit 15% x D 303,465.75
F Harga Satuan Pekerjaan (D+E) 2,326,570.75
A TENAGA
Pekerja L.01 OH 1.200 67,500.00 81,000.00
Tukang Batu L.02 OH 0.145 81,000.00 11,745.00
Kepala Tukang L.03 OH 0.150 85,500.00 12,825.00
Mandor L.04 OH 0.100 90,000.00 9,000.00
JUMLAH TENAGA KERJA 114,570.00
B BAHAN
Wastafel Buah 1.000 171,000.00 171,000.00
Perlengkapan 30% Harga Wastafel - 0.300 171,000.00 51,300.00
Semen Kg 6.000 1,137.50 6,825.00
Pasir Pasang m3 0.010 342,000.00 3,420.00
JUMLAH HARGA BAHAN 232,545.00
C PERALATAN
D Jumlah A + B + C 347,115.00
E Overhead & Profit 15% x D 52,067.25
F Harga Satuan Pekerjaan (D+E) 399,182.25
A. 5.1.1.16 Pemasangan 1 buah Bak Kontrol Pas.Batu Bata 45 x 45 tinggi 50 cm 643,526.20
A TENAGA
Pekerja L.01 OH 3.200 67,500.00 216,000.00
Tukang Batu L.02 OH 1.150 81,000.00 93,150.00
Kepala Tukang L.03 OH 0.011 85,500.00 940.50
Mandor L.04 OH 0.016 90,000.00 1,440.00
JUMLAH TENAGA KERJA 311,530.50
B BAHAN
Batu Bata bh 70.000 810.00 56,700.00
Semen kg 77.000 1,137.50 87,587.50
Pasir Pasang m3 0.130 342,000.00 44,460.00
Pasir Beton m3 0.090 342,000.00 30,780.00
Kerikil m3 0.020 198,000.00 3,960.00
Baja Tulangan kg 2.600 9,450.00 24,570.00
JUMLAH HARGA BAHAN 248,057.50
C PERALATAN
D Jumlah A + B + C 559,588.00
E Overhead & Profit 15% x D 83,938.20
F Harga Satuan Pekerjaan (D+E) 643,526.20
A TENAGA
Pekerja L.01 OH 0.036 67,500.00 2,430.00
Tukang Batu L.02 OH 0.060 81,000.00 4,860.00
Kepala Tukang L.03 OH 0.006 85,500.00 513.00
Mandor L.04 OH 0.002 90,000.00 180.00
JUMLAH TENAGA KERJA 7,983.00
B BAHAN
Pipa PVC Ø ¾" m' 1.200 9,900.00 11,880.00
Perlengkapan 35% x pipa Ls 0.350 9,900.00 3,465.00
JUMLAH HARGA BAHAN 15,345.00
C PERALATAN
D Jumlah A + B + C 23,328.00
E Overhead & Profit 15% x D 3,499.20
F Harga Satuan Pekerjaan (D+E) 26,827.20
A. 5.1.1.31 Pemasangan 1 m' Pipa PVC tipe AW Ø 3" 142,527.26
A TENAGA
Pekerja L.01 OH 0.081 67,500.00 5,467.50
Tukang Batu L.02 OH 0.135 81,000.00 10,935.00
Kepala Tukang L.03 OH 0.014 85,500.00 1,154.25
Mandor L.04 OH 0.004 90,000.00 360.00
JUMLAH TENAGA KERJA 17,916.75
B BAHAN
Pipa PVC Ø 3" m' 1.200 68,400.00 82,080.00
Perlengkapan 35% x pipa Ls 0.350 68,400.00 23,940.00
JUMLAH HARGA BAHAN 106,020.00
C PERALATAN
D Jumlah A + B + C 123,936.75
E Overhead & Profit 15% x D 18,590.51
F Harga Satuan Pekerjaan (D+E) 142,527.26
REKAPITULASI ANGGARAN BIAYA
KEGIATAN :
PEKERJAAN :
LOKASI :
TAHUN ANGARAN :
HARGA SATUAN
NO KODE URAIAN PEKERJAAN SAT PEKERJAAN
Rp.
1 A 4.1.1. 1 Membuat 1 m3 Beton mutu f'c=7,4 Mpa (K100), slum (12±2)cm, w/c = 0,87 m3 1,136,943.80
3 A 4.1.1. 7 Membuat 1 m3 Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 m3 1,491,945.52
Penyedia Jasa
CV. BINA SERASI
A PEKERJAAN PERSIAPAN
1 Uitzet Lapangan 1.00 Ls 500,000.00 500,000.00
2 Pembersihan Lapangan 1.00 Ls 500,000.00 500,000.00
3 Buang Bongkaran Keluar Lokasi 1.00 Ls 2,000,000.00 2,000,000.00
JUMLAH A 3,000,000.00
B REHAB SALURAN GEDUNG DIPONEGORO
1 Bongkar Plat Beton Existing 2.75 m3 1,109,750.00 3,050,702.75
2 Bongkar Kansten 1.00 m3 607,579.50 608,582.01
3 Bongkar Pondasi Saluran Sedalam 5cm 0.50 m3 855,082.50 429,678.96
4 Bongkar Rabat Beton Taman 0.72 m3 1,019,820.00 734,270.40
5 Plesteran 60.60 m2 94,753.10 5,742,037.86
6 Acian 79.19 m2 54,165.00 4,289,326.35
7 Beton Lantai Saluran 0.58 m3 1,136,943.80 662,156.07
8 Membuat Grill Besi Plat 2mm 5.00 m1 475,000.00 2,375,000.00
9 Membuat Bak Kontrol 0,25 x 0,25 1.00 bh 530,000.00 530,000.00
10 Cor Beton Penutup Saluran + Pembesian 4.12 m3 3,131,960.52 12,914,639.20
11 Pembuatan Bekisting 38.79 m2 314,881.50 12,214,253.39
JUMLAH B 43,550,646.97
JUMLAH TOTAL (A + B ) 46,550,646.97
PPN 10% 4,655,064.70
JUMLAH TOTAL + PPN 10% 51,205,711.67
DIBULATKAN 51,205,000.00
UNGARAN,
CV. CIPTA KARYA MANDIRI
PEKERJAAN : REHAB PELEBARAN JALAN KANTOR PP-PAUD DAN DIKMAS JAWA TENGAH
LOKASI : KANTOR PP-PAUD DAN DIKMAS JAWA TENGAH
TAHUN ANGARAN : 2020
UNGARAN,
CV. CIPTA KARYA MANDIRI
A PEKERJAAN PERSIAPAN
1 Uitzet Lapangan 1.00 Ls 500,000.00 500,000.00
2 Pembersihan Lapangan 1.00 Ls 500,000.00 500,000.00
3 Buang Bongkaran Keluar Lokasi 1.00 Ls 2,000,000.00 2,000,000.00
JUMLAH A 3,000,000.00
B REHAB SALURAN DEPAN RUMAH DINAS KEPALA
1 Bongkar Plat Beton Existing 2.93 m3 1,109,750.00 3,246,018.75
2 Bongkar Rabat Beton 5.00 m3 1,019,820.00 5,101,139.64
3 Bongkar Kansten 0.66 m3 607,579.50 403,299.12
4 Bongkar Pondasi Saluran Sedalam 5cm 0.20 m3 855,082.50 168,023.71
5 Penggalian Tanah 34.10 m3 70,495.00 2,404,020.49
6 Urugan Pasir 1.26 m3 384,962.50 485,052.75
7 Membuat Pondasi Saluran 8.82 m3 1,212,243.75 10,691,989.88
8 Plesteran 55.38 m2 94,753.10 5,247,426.68
9 Acian 74.58 m2 54,165.00 4,039,625.70
10 Beton Lantai Saluran 0.91 m3 1,136,943.80 1,029,434.40
11 Membuat Bak Kontrol 0,70 x 0,70 1.00 bh 700,000.00 700,000.00
12 Membuat Grill Besi Plat 2mm 5.00 m1 490,000.00 2,450,000.00
13 Cor Beton Penutup Saluran + Pembesian 4.39 m3 3,131,960.52 13,741,476.77
14 Pembuatan Bekisting 37.63 M2 314,881.50 11,848,990.85
JUMLAH B 61,556,498.73
JUMLAH TOTAL (A + B) 64,556,498.73
PPN 10% 6,455,649.87
JUMLAH TOTAL + PPN 10% 71,012,148.60
DIBULATKAN 71,012,000.00
UNGARAN,
CV. BINA SERASI
UNGARAN,
CV. BINA SERASI
A PEKERJAAN PERSIAPAN
1 Uitzet Lapangan 1.00 Ls 500,000.00 500,000.00
2 Pembersihan Lapangan 1.00 Ls 500,000.00 500,000.00
3 Buang Bongkaran Keluar Lokasi 1.00 Ls 2,000,000.00 2,000,000.00
JUMLAH A 3,000,000.00
B REHAB SALURAN GEDUNG DIPONEGORO
1 Bongkar Plat Beton Existing 2.75 m3 1,109,750.00 3,050,702.75
2 Bongkar Kansten Pasangan Bata 1.00 m3 607,579.50 608,582.01
3 Bongkar Pondasi Saluran Sedalam 5cm 0.50 m3 855,082.50 429,678.96
4 Bongkar Rabat Beton Taman 0.72 m3 1,019,820.00 734,270.40
5 Plesteran 60.60 m2 94,753.10 5,742,037.86
6 Acian 79.19 m2 54,165.00 4,289,326.35
7 Beton Lantai Saluran 0.58 m3 1,136,943.80 662,156.07
8 Membuat Grill Besi Plat 2mm 5.25 m1 475,000.00 2,493,750.00
9 Membuat Bak Kontrol 0,25 x 0,25 1.00 bh 530,000.00 530,000.00
10 Cor Beton Penutup Saluran + Pembesian 4.12 m3 3,131,960.52 12,914,639.20
11 Pembuatan Bekisting 38.79 m2 314,881.50 12,214,253.39
JUMLAH B 43,669,396.97
C REHAB SALURAN DEPAN RUMAH DINAS KEPALA
1 Bongkar Plat Beton Existing 2.93 m3 1,109,750.00 3,246,018.75
2 Bongkar Kansten Pasangan Bata 0.66 m3 607,579.50 403,299.12
3 Bongkar Pondasi Saluran Sedalam 5cm 0.20 m3 855,082.50 168,023.71
4 Plesteran 43.96 m2 94,753.10 4,165,346.28
5 Acian 57.45 m2 54,165.00 3,111,779.25
6 Beton Lantai Saluran 0.62 m3 1,136,943.80 699,720.69
7 Membuat Grill Besi Plat 2mm 5.00 m1 475,000.00 2,375,000.00
8 Membuat Bak Kontrol 0,75 x 0,75 1.00 Ls 852,000.00 852,000.00
9 Cor Beton Penutup Saluran + Pembesian 4.39 m3 3,131,960.52 13,741,476.77
10 Pembuatan Bekisting 35.95 M2 314,881.50 11,319,989.93
JUMLAH C 40,082,654.50
JUMLAH TOTAL (A + B + C) 86,752,051.47
PPN 10% 8,675,205.15
JUMLAH TOTAL + PPN 10% 95,427,256.62
DIBULATKAN 95,427,000.00
UNGARAN,
CV. CIPTA KARYA MANDIRI
A PEKERJAAN PERSIAPAN
1 Uitzet Lapangan 1.00 Ls 500,000.00 500,000.00
2 Pembersihan Lapangan 1.00 Ls 500,000.00 500,000.00
JUMLAH A 1,000,000.00
B REHAB HALAMAN GEDUNG DIPONEGORO
1 Bongkaran Rabat Beton Existing 1.66 m3 1,109,750.00 1,847,095.64
2 Buang Bongkaran Keluar Lokasi 1.00 Ls 1,000,000.00 1,000,000.00
4 Pemasangan Keramik Lantai 40x40 cm 33.29 m2 272,253.44 9,062,908.76
3 Pemasangan Plint Kramik lebar 10cm 2.17 m2 57,734.60 124,995.41
5 Perbaikan Bak Kontrol 1.00 Ls 750,000.00 750,000.00
JUMLAH B 12,784,999.82
JUMLAH TOTAL (A + B) 13,784,999.82
PPN 10% 1,378,499.98
JUMLAH TOTAL + PPN 10% 15,163,499.80
DIBULATKAN 15,163,000.00
UNGARAN,
CV. CIPTA KARYA MANDIRI
UNGARAN,
CV. CIPTA KARYA MANDIRI
T BAHAN BANGUNAN
Abu Batu
Air
Air
Alat-alat kerja / Alat bantu :
- Pekerjaan jalan
- Pekerjaan tanah
- Pekerjaan pasangan
- Pekerjaan perpipaan
Agregat Kasar
Agregat Halus
siler/cat dasar tembok interior
Aluminium plat BJLS 30
Amplas Besi
Amril / amplas
Asbes gel. Kecil 0,9 m x 2,10 m
Asbes gel. Kecil 0,9 m x 2,40 m
Asbes gel. Kecil 0,9 m x 2,90 m
Asbes gel. Kecil 1,05 m x 2,10 m
Asbes gel. Kecil 1,05 m x 2,40 m
Asbes gel. Kecil 1,05 m x 3,00 m
Asbes gel. Besar 1,02 m x 2,10 m
Asbes gel. Besar 1,02 m x 2,40 m
Asbes gel. Besar 1,02 m x 3,00 m
Asbes Kerpus Gel. 1,0 m x 1,0 m
Asbes Plat/ eternity 1,0 m x 1,0 m
Asbes gel. Besar 1,02 m x 3,00 m
Asbes Kerpus Gel . 1,0 m x 1,0 m
Asbes Plat/ eternity 1,0 m x 1,0 m
Aspalt penetrasi 60/70
Aspalt Treated base (ATB) / AC-BC
Aspalt Treated base (ATB) / AC-WC
Aspalt Treated base (ATB) / AC-WC
Latasir
Baja Profil (struktur)
Baja Plat
Bak Kontrol 21x31,5x38
Bambu Ø 8-10 cm p = 4 m
Bambu Ø 10-12 cm p = 4 m
Bataco 40 x 20 x 10 cm
Batang kelapa 4m
Batu apung
Batu Bata biasa
Batu blondhos
Batu candi 30 x 30
Batu koral sikat
Batu Kerikil sungai (tersaring)
Batu muka
Batu Palimanan
Batu andesit bakar
Batu lempeng
Batu serat hitam
Batu pecah 0,5/1 (pecah mesin) ( chip )
Batu pecah 1/2 (pecah mesin)
Batu pecah 2/3 (pecah mesin)
Batu pecah 3/5 (pecah mesin)
Batu pecah 4/6 (pecah tangan)
Batu pecah 5/7 (pecah tangan)
Batu belah / pecah 7/10 - 10/15 - 15/20
Batu belah/pecah besar
Besi Baja Ringan atap bentg 9-12m Zincalum
Besi beton polos SNI
Besi beton ulir SNI
Besi Profil C
Baja IWF
Besi Profil Siku
Besi sengkang (angkur, baut)
Besi strip plat t= 2 mm
Besi strip 0,5 cm
Besi teralis/strip plat (Terpasang)
Bottom Patch Fitting
Bottom / Top Lock Fitting
Bronjong fabrikasi 2,7m
Sesek bambu
BRC t = 120 x 240 cm Galvanis Ø 6mm
BRC t = 150 x 240 cm Galvanis Ø 6mm
BRC t = 120 x 240 cm Galvanis Ø 8mm
BRC t = 150 x 240 cm Galvanis Ø 8mm
BRC (tiang t = 120 ) Galvanis
BRC (tiang t = 150 ) Galvanis
Cat besi
Cat brom
Cat Kayu
Cat Meni
Cat Tembok interior
Cat Tembok interior
Cat Tembok exterior
Cat Tembok exterior
Cat Waterproof
Cat Thermoplastic
Coating batu alam
Dempul Plamur kayu
Door Closer
Door Stop
Elastomer
Expansion joint type 1 5 x 6 x 25 cm
Expansion joint type 2 5 x 10 x 25 cm
Expansion joint Type 3 5 x 5 x 25 cm
Engsel Kupu-kupu biasa
Engsel Nylon Pintu
Espanyolet
Eternit 1 x 1 m
Floor Drain
Flush Bolt
Fiberglass Septictank Bio Filter Kap. 2-4 Org
Fiberglass Septictank Bio Filter Kap. 4-6Org
Fiberglass Septictank Bio Filter Kap. 6-8 Org
Fiberglass Septictank Bio Filter Kap. 8-10 Org
Fixed Top Pin
Floor Hinges
Floor Deck / Bondek t = 0.70 - 1000 mm
Floor Deck / Bondek t = 0.75 - 1000 mm
Floor Deck / Bondek t = 1.00 - 1000 mm
Flinkote
Folding gate PVC (terpasang) DN 40 cm, panjang 1 meter
Folding gate 0.4
Folding gate besi 0.8 terpasang
Formica
Formite/spacer
Genteng Kerpus Metal Lapis Pasir
Genteng Kerpus Metal Polos
Genteng Kerpus tanah (5 bh/m) ex.Kebumen
Genteng tanah liat Kebumen (biasa) kerpus plentong
Genteng tanah liat Kebumen (biasa) kerpus kodok
Genteng tanah liat Lokal kerpus plentong
Genteng tanah liat Lokal kerpus kodok
Genteng Kerpus beton natural (3 bh/m)-Gt.9
Genteng Kerpus beton natural (3 bh/m)-Gt.11
Genteng tanah liat Jatiwangi (biasa) kerpus plentong
Genteng tanah liat Jatiwangi (biasa) kerpus kodok
Genteng tanah liat Jatiwangi (glasur) kerpus plentong
Genteng tanah liat Jatiwangi (glasur) kerpus kodok
Genteng beton natural (9bh/m2)
Genteng beton natural (11bh/m2)
Genteng beton cat (9bh/m2)
Genteng beton kerpus (3bh/m2)
Genteng Keramik
Genteng sirap
Genteng Metal t = 0,35 mm
Genteng tanah liat Kebumen kodok (25 bh/m2)
Genteng tanah liat Kebumen (biasa) plentong (25 bh/m2)
Genteng tanah liat Kebumen (biasa) plentong (18 bh/m2)
Genteng tanah liat Kebumen (biasa) plentong (14 bh/m2)
Genteng tanah liat Lokal Kodok (25 bh/m2)
Genteng tanah liat Lokal plentong (25 bh/m2)
Genteng tanah liat Lokal plentong (18 bh/m2)
Genteng tanah liat Lokal plentong (14 bh/m2)
Genteng tanah liat Jatiwangi (biasa) Kodok (25 bh/m2)
Genteng tanah liat JAtiwangi (biasa) plentong (25 bh/m2)
Genteng tanah liat Jatiwangi (biasa) plentong (18 bh/m2)
Genteng tanah liat Jatiwangi (biasa) plentong (14 bh/m2)
Genteng tanah liat Jatiwangi (glasur) Kodok (25 bh/m2)
Genteng tanah liat Jatiwangi (glasur) plentong (25 bh/m2)
Genteng tanah liat Jatiwangi (glasur) plentong (18 bh/m2)
Genteng Kaca plentong 5 mm
Genteng gelombang bitumen
Glass Bit
Grass block 20 x 20
Grass block lubang kotak (K-300)
Gorong-gorong DN 20 cm , panjang 1 meter
Gorong-gorong DN 30 cm, panjang 1 meter
Gorong-gorong DN 40 cm, panjang 1 meter
Gorong-gorong DN 50 cm , panjang 1 meter
Gorong-gorong DN 60 cm, panjang 1 meter
Gorong-gorong DN 70 cm, panjang 0,5 meter
Gorong-gorong DN 80 cm, panjang 0.5 meter
Gorong-gorong DN 100 cm panjang 0.5 meter
Got Type U - 15 cm, panjang 1 m
Got Type U - 20 cm, panjang 1 m
Got Type U - 30 cm, panjang 1 m
Got Type U - 40 cm, panjang 1 m
Grendel Biasa
Guard Rail
Handle / Pegangan pintu (kecil)
Handle / Pegangan pintu (besar)
Hot roller sheet (HRS)
Ijuk
Kaca bening 3 mm
Kaca bening 5 mm
Kaca es/dop
Kaca raindown
Kaca ryben 5 mm
Kanstein Batako 10 x 20 x 50
Kanstein Lubang 10/12,5 x 25 x 50
Kanstein Standar 10/12,5 x 25 x 50
Kanstein Lubang K200 ukuran 10/12,5 x 30 x 50
Kanstein Standar K200 ukuran 10/12,5 x 30 x 50
Kanstein Standar K200 ukuran 15/20 x 30 x 50
Kanstein Lubang K200 ukuran 15/20 x 30 x 50
Kanstein Lubang K300 ukuran 15/20 x 30 x 50
Kanstein Standar K300 ukuran 15/20 x 30 x 50
Kanstein Lubang
Kanstein Standar
Kanstin Sirip 15/20 x 35 x 50
Kanstein Standar 13/16 x 28 x 50
Kapur pasang
Kapur pasang
Karung banjir 50 kg
Kawat beton/Bendrat
Kawat Bronjong Galvanis
Kawat duri (50 m)
Kawat harmonika 12 x 45 mm
Kawat harmonika 12 x 24 mm
Kawat harmonika 14 x 30 mm
Kawat harmonika 14 x 35 mm
Kawat harmonika 53 X 53 X 10 mm
Kawat kasa besi
Kawat kasa plastik
Kawat las listrik
Kayu bakar
Kayu bengkirai (balok)
Kayu bengkirai (papan)
Kayu bengkirai 2/3
Kayu bengkirai 3/5
Kayu bengkirai 5/7
Kayu cetakan
Kayu dolok DN / Dolken 8-10 cm
Kloset jongkok
Kuas cat
Rol cat
Roll cat
Rolling door (terpasang)
Rooster 10 x 20 cm (PC)
Rooster 15 x 25 cm (PC)
Rooster 15 x 30 cm (PC)
Rooster 20 x 20 cm (PC)
Rooster 25 x 25 cm (PC)
Rooster 30 x 30 cm (PC)
Tali Ijuk
Tanah Lempung
Tanah Padas
Tanah urug
Teer
Tendon (Kabel baja jembatan)/Sling 5/8" 5/8"
Tendon (Kabel baja jembatan)/Sling 3/4" 3/4"
Tendon (Kabel baja jembatan)/Sling 7/8" 7/8"
Tendon (Kabel baja jembatan)/Sling 1" 1"
Tendon (Kabel baja jembatan)/Sling 20 mm 20 mm
Keramik dinding 10 x 20
Keramik dinding 20 x 25
Keramik dinding 25 x 40
Ubin keramik 6 X 20 (lis keramik)
Veet
Wastafel INA
Wood tiller ex.IMPRA
Zinc washbak
U-ditch Uk. 60x100x120 cm
Cover HD Uk. 74 x 120 cm, tbl. 15 cm
U-ditch Uk. 80x100x120 cm
Cover HD Uk. 94 x 120 cm, tbl. 15 cm
Box Culvert Uk. 80 x 80 x 120 cm, tbl. 15 cm
Pengecatan Epoxy
Epoxy coating tebal 200 mikron
Epoxy coating tebal 300 mikron
Epoxy coating tebal 500 mikron
Epoxy coating tebal 1000 mikron
Hebbel
Ukuran 7,5 x 20 x 60 cm (isi 111 buah/m3)
Paving Dekoratif
Paving Dekoratif Garis Gruff 50 x 25 x 6 (K350)
Paving Dekoratif Difabel 30 x 30 x 6 (K350)
Paving Dekoratif Grass Block Motif 25 x 25 x 6 (K350)
Paving Dekoratif BLINDHOLD 30 x 30 x 6 (K350)
Paving Dekoratif Holland Polos 25 x 12,5 x 6 (K300-450)
Paving Dekoratif AROUND OF TRESS 50 x 50 (K350) (1 set 4 pcs)
Buis Beton Bulat Q 30 x 100 = 3 cm
Buis Beton Bulat Q 40 x 100 = 4 cm
Buis Beton Bulat Q 50 x 100 = 5 cm
Buis Beton Bulat Q 60 x 50 = 6 cm
Buis Beton Bulat Q 80 x 50 = 8 cm
Buis Beton Bulat Q 100 x 50 = 10 cm
Buis Beton Belah (1/2) Q 30 x 100 = 3 cm
U-Ditch 50 x 52/34 x 4/41 = 7 cm
U-Ditch 50 x 72/54 x 48/41 = 7 cm
U-Ditch 50 x 92/74 x 48/41 = 7 cm
Kanstein L 60 x 37 x 28 (K300)
Kanstein 60 x 10:20 x 40 (K300)
Kanstein S Kecil 49 x 34 x 7:14 (K300)
Kanstein S Besar 59 x 29 x 10.5:14.5 (K300)
Kanstein Besar / Kerb 60 x 30 x 20 (K300)
Kanstein Kecil / BTC Non Lock 40 x 20 x 10 (K300)
Kanstein Lock / BTC Lock 50 x 20 x 10 (K300)
Pagar Panel Beton Precast 160 m2 = 4 Lembar Panel 225x16x16 cm
Pagar Panel Beton Precast 200 m2 = 5 Lembar Panel 280x16x16 cm
Pagar Panel Beton Precast 240 m2 = 6 Lembar Panel 320x16x16 cm
Pagar Panel Beton Precast 280 m2 = 7 Lembar Panel 370x16x16 cm
Pagar Panel Beton Precast 320 m2 = 8 Lembar Panel 400x16x16 cm
Pagar L.5 Jalur 60 cm Siku 40x40x3 cm
- Stang drat
- Stel ring
- Kisdam
- Frame dasar
- Plat peluncur
Depresiasi Mixer
Depresiasi peralatan logging
Depresiasi peralatan mesin
Depresiasi peralatan pengeboran
Depresiasi pompa injeksi
Depresiasi alat redeveloping
Liqoit Oil grundfose
Pemeliharaan sumur dan ME.
PENGEBORAN
Centraliser
Depresiasi alat redeplopping
Depresiasi mixer
Depresiasi Peralatan logging
Depresiasi Peralatan mesin
Depresiasi Peralatan pengeboran
Depresiasi Pompa injeksi
Grevel
Kawat Las. RB. 26
Kawat Las. RB. 32
Liquid Oil Grundfose
Panel Pompa
Tiang Kabel
BAHAN INTERIOR
ACP (Alumunium Composite Panel) PVDF (0,3x1200x2440)mm
PVDF (0,3x1220x4880)mm
HPL (High Pressure Laminate) (1220x2440mm)/polos
(1220x2440mm)/motif
Wallpaper Merk Remember
Merk King / Queen
Hebel 60 x 20 x 10 cm
60 x 20 x 15 cm
60 x 20 x 20 cm
Horisontal Blind Merk Shinichi
Vertical Blind Merk Shinichi
Kain Gordyn Merk Lexus
Merk Raisha
Kain Vitrase Merk Lexus
Rollet Merk Tozan
Rell Gordyn Merk Tozan
Hook Marmer Merk Shinichi
Tosel Merk Tozan
Carpet Lantai Merk Crown
Lis Stainless steel
Lp. Sorot Halogen (kecil)
Indirect Light (LED Strip)
Kabel VGA P = 15 m
Stop Kontak Telephone
Stop Kontak Antena
Engsel Slowmotion
Acrylic 122 cm x 83 cm x 3mm
122 cm x 83 cm x 4mm
122 cm x 83 cm x 5mm
122 cm x 83 cm x 6mm
122 cm x 83 cm x 8mm
122 cm x 83 cm x 10mm
122 cm x 83 cm x 12mm
MDF / Particleboard 1220 x 2440 x 9 mm
1220 x 2440 x 15 mm
1220 x 2440 x 18 mm
Genteng Metal Roof Berpasir
Polos
Onduline (Aspal Bitumen) 90 x 200
Plang Papan Nama Kepemilikan Tanah bahan plat besi
Patok Batas Tanah Bahan cor
Prasasti bahan marmer ukuran 60 x 90 cm
Atap Galvanum
Kerpus Galvanum
Baut Roofing
Pelapis Anti Bocor
Listplastik
SATUAN HARGA
M3 245,000
M3 15,000
Ltr 150
Unit/jam 85,000
Unit/jam 36,000
Unit/jam 64,000
Unit/jam 4,000
M3 270,000
M3 197,000
Kg 50,000
M² 140,000
Lembar 5,000
Lembar 3,000
Lembar 62,700
Lembar 71,000
Lembar 86,100
Lembar 56,000
Lembar 63,000
Lembar 80,000
Lembar 65,400
Lembar 74,800
Lembar 93,500
Lembar 90,700
Lembar 110,000
Lembar 132,000
Lembar 30,500
Lembar 17,100
Kg 12,000
Ton 1,183,200
Ton 1,210,000
Ton 1,176,000
Ton 1,342,000
Kg 3,500
Kg 15,500
Buah 26,700
Batang 15,000
Batang 25,000
Buah 3,000
Batang 262,500
Kg. 17,000
Buah 850
M3 165,000
M2 137,500
M2 60,000
M3 146,800
M3 2,000
M3 132,000
M3 145,000
M3 70,000
M3 126,500
M3 350,000
M3 350,000
M3 350,000
M3 330,000
M3 285,000
M3 285,000
M3 360,000
M3 310,000
m2 264,000
Kg 10,000
Kg 10,000
Kg 11,000
Kg 11,000
Kg 11,000
Kg 21,000
Kg 11,000
Kg 25,300
M2 90,000
set 500,000
set 1,500,000
unit/m3 300,000
unit/m3 325,000
M2 10,000
Buah 231,000
Buah 385,000
Buah 425,000
Buah 508,000
Buah 118,800
Buah 86,500
Kg. 60,000
Kg. 65,000
Kg 60,000
Kg. 30,000
Kg 25,000
Kg 22,000
Kg 50,000
Kg 30,000
kg 55,000
Kg 145,100
Kg 70,000
Kg 16,600
Buah 330,000
Buah 45,000
Buah 615,000
m' 402,500
m' 517,500
m' 373,700
Buah 4,600
Buah 14,300
Buah 33,000
M2 20,000
Bh 72,000
Set 140,000
Unit 5,258,000
Unit 6,600,000
Unit 7,900,000
Unit 10,800,000
Set 200,000
Set 2,200,000
M² 113,000
M² 115,000
M² 171,000
Kg. 20,000
M² 850,000
M² 555,000
M² 625,000
Lembar 75,000
Buah 11,000
Buah 16,000
Buah 13,900
Buah 4,400
Buah 11,000
Buah 11,000
Buah 5,500
Buah 4,350
Buah 7,500
Buah 7,000
Buah 5,500
Buah 5,400
Buah 7,000
Buah 5,400
Buah 4,800
Buah 7,700
Buah 6,500
Buah 7,800
Buah 10,000
Buah 2,100
Buah 100,000
Buah 2,800
Buah 2,700
Buah 4,400
Buah 3,900
Buah 2,000
Buah 1,500
Buah 1,550
Buah 1,350
Buah 2,000
Buah 2,800
Buah 3,000
Buah 3,500
Buah 7,800
Buah 5,700
Buah 4,500
Buah 11,000
Lembar 160,000
Kg 2,650
Buah 20,000
Buah 15,500
Buah 49,500
Buah 71,000
Buah 82,500
Buah 110,000
Buah 143,000
Buah 132,000
Buah 145,000
Buah 247,000
Buah 33,000
Buah 44,000
Buah 55,000
Buah 71,500
Buah 10,000
m/kg 775,000
Buah 75,000
Buah 160,000
Ton 1,320,000
Kg 7,000
M2 82,500
M2 93,500
M3 120,000
M2 150,000
M2 100,000
bh 19,000
bh 26,500
bh 20,700
bh 28,000
bh 30,000
bh 48,000
bh 53,000
bh 55,000
bh 51,000
bh 29,000
bh 22,000
bh 34,150
bh 26,600
kg 6,600
M3 247,500
B 6,750
u
a
Kg 16,500
Kg 14,300
Rol 75,800
M' 63,900
M' 83,300
M' 54,400
M' 46,700
M' 93,400
M' 23,100
M2 14,250
Kg 25,650
M3 135,000
M3 11,800,000
M3 13,000,000
M3 6,800,000
M3 7,250,000
M3 8,750,000
M3 3,450,000
B 35,000
at
a
M3 22,550,000
M3 25,300,000
M3 29,000,000
M3 8,500,000
M3 10,000,000
M3 6,000,000
M3 6,000,000
M3 7,150,000
M3 6,400,000
M3 6,820,000
M3 6,325,000
M3 6,325,000
M3 6,600,000
M3 5,300,000
M3 6,000,000
M3 5,600,800
M3 5,600,800
M3 5,600,800
M3 4,100,000
M3 4,100,000
M3 3,615,000
M3 3,000,000
M3 3,000,000
M3 1,100,000
M3 1,100,000
M3 3,450,000
M3 3,450,000
M3 2,375,000
M3 2,375,000
M3 2,000,000
M3 1,200,000
M3 2,000,000
m' 44,000
m' 6,500
m' 44,000
m' 45,000
B 1,500,000
u
a
B 185,000
u
a
B 7,000
u
a
B 10,000
u
a
B 15,000
u
a
B 20,000
u
a
B 121,000
u
a
B 152,000
u
a
Buah 64,100
Buah 86,900
Buah 73,000
M' 75,000
M' 71,500
M' 93,500
M' 118,000
M' 120,000
Buah 300,000
Unit 1,050,000
Unit 1,320,000
Ton 1,465,000
Kg 98,000
Kg 47,700
Liter 32,000
m' 16,400
m' 12,000
m' 13,500
M' 6,800
M3 275,000
M3 223,000
M3 270,000
buah 11,700
buah 12,300
buah 12,300
Liter 20,000
Liter 30,000
Lembar 140,000
Lembar 167,000
Lembar 93,500
kg 26,000
Buah 6,500
Buah 46,500
Buah 30,500
Set 900,000
Set 1,300,000
Kg 15,000
Buah 8,500
Buah 10,750
Buah 3,200
Kg 17,000
Kg 22,000
Kg 11,800
M2 112,000
M2 104,000
M2 160,000
Buah 11,500
M3 380,000
M3 250,000 6250000
M3 143,000
m2 66,000
m2 75,000
m2 75,000
m2 85,800
M2 47,000
M2 35,000
M2 34,100
m2 72,500
m2 96,000
m2 96,750
m2 96,750
m2 72,500
m2 70,000
m2 95,000
m2 123,000
m2 73,000
m2 73,000
m2 75,000
m2 73,000
m2 84,500
m2 84,500
m2 97,000
m2 85,000
m2 97,000
m2 89,000
m2 86,500
M2 116,000
m2 100,000
m2 100,000
Zak 55,000
Kg 1,375
Zak 100,000
Kg 11,550
Set 40,000
Kg 42,000
Kg 1,600
Kg 4,300
Bh 13,200
Bh 10,500
M2 76,300
M2 74,500
M2 85,000
M² 120,000
m2 81,500
m2 75,000
m2 27,300
Kg 20,000
Kg 13,500
Liter 44,000
L 140,000
e
m
b
M' 6,000
M' 4,000
Bh 22,000
bh 24,000
B 105,000
u
a
bh 22,000
M² 105,000
B 12,600
u
a
B 13,200
u
a
B 11,300
u
a
B 11,700
u
a
B 14,000
u
a
B 16,500
u
a
le 48,400
m
b
le 50,000
m
b
le 56,000
m
b
le 68,000
m
b
m' 24,800
m' 22,000
bh 10,000
bh 10,000
Kg. 9,500
M3 242,000
kg 11,000
Liter 5,950
Liter 12,000
L 72,500
e
m
b
L 115,000
e
m
b
Kg 11,000
M3 49,500
M3 77,000
M3 71,500
ltr 23,000
M' 24,000
M' 35,000
M' 52,000
M' 61,000
L 43,000
e
m
b
L 83,200
e
m
b
L 126,500
e
m
b
L 295,000
e
m
b
L 340,000
e
m
b
M² 57,700
M² 58,900
M² 77,000
b 4,500
u
a
M² 37,500
M² 49,500
M² 57,300
M² 54,500
M² 46,300
M² 54,500
M² 51,800 0.12 0.96
M² 60,000
M² 137,500 17500
M² 245,000
M² 270,000
M² 250,000
M² 300,000
Bh 8,200
Bh 5,500
Bh 480,000
Bh 375,000
M² 187,000
M² 210,000
M² 495,000
b 40,000
u
a
b 60,000
u
a
Kg 24,400
bh 190,000
kg 33,000
bh 206,000
Unit 1,287,000
Unit 522,000
Unit 1,342,000
Unit 660,000
Unit 3,547,000
m2 665,500
m2 165,000
m2 63,200
m2 43,400
b 33,000
at
a
b 30,300
at
a
b 27,500
at
a
m3 913,000
le 42,900
m
b
bh 4,400,000
bh 4,730,000
m' 495,000
m2 85,200
m2 115,500
le 412,500
m
b
le 522,500
m
b
le 632,500
m
b
le 962,500
m
b
m2 132,000
m2 165,000
m2 209,000
m2 275,000
b 760,000
u
a
b 810,000
u
a
bh 495,000
bh 561,000
bh 627,000
bh 759,000
bh 836,000
bh 924,000
bh 1,061,500
bh 1,210,000
bh 1,298,000
bh 880,000
bh 968,000
bh 1,056,000
bh 1,265,000
bh 1,375,000
bh 1,485,000
bh 1,265,000
bh 1,430,000
bh 1,320,000
bh 1,815,000
bh 236,500
bh 308,000
bh 368,500
bh 489,500
m2 115,500
bh 44,000
bh 99,000
bh 44,000
m2 115,500
set 121,000
bh 66,000
bh 79,200
bh 106,700
bh 89,100
bh 118,800
bh 156,200
bh 51,700
bh 280,500
bh 396,000
bh 500,500
bh 69,300
bh 69,300
bh 41,800
bh 47,300
bh 63,800
bh 25,300
bh 30,800
bh 4,950
m 363,000
m 484,000
m 539,000
m 627,000
m 715,000
le 121,000
m
b
b 137,500
at
a
b 253,000
at
a
b 313,500
at
a
b 357,500
at
a
b 412,500
at
a
b 473,000
at
a
unit 2,500,000
unit 3,000,000
unit 10,800,000
unit 11,750,000
unit 24,730,000
unit 25,700,000
unit 43,650,000
unit 45,450,000
m 333.000,-
et
er
la
m 402.000,-
et
er
la
m 14.000,-
et
er
la
m 76.000,-
et
er
la
m 2.819.000,-
et
er
la
m 2.013.000,-
et
er
la
m 3.141.000,-
et
er
la
m 1.851.000,-
et
er
la
m
et
1.208.000,-
er
la
m 402.000,-
et
er
la
m 42.000,-
et
er
la
m 402.000,-
et
er
la
m 2.174.000,-
et
er
la
m 1.530.000,-
et
er
la
m 2.174.000,-
et
er
la
m 281.000,-
et
er
la
pkt 3.081.800,-
Ttk 1.542.000,-
pkt 2.293.400,-
pkt 938.000,-
pkt 361.500,-
pkt 2.409.500,-
unit 120.600,-
unit 962.600,-
unit 722.100,-
unit 1.082.300,-
unit 481.900,-
unit 2.391.400,-
liter 304.400,-
P 7.608.700,-
er
p
kt
M3 840,000
M3 912,000
M3 930,000
M3 948,000
M3 972,000
M3 990,000
M3 1,008,000
M3 1,032,000
M3 1,050,000
M3 1,074,000
M3 1,104,000
M3 1,116,000
M3 1,134,000
M3 1,182,000
M3 1,370,000
m' 266,000
m' 202,000
m' 125,000
m' 83,000
m' 41,000
m' 26,000
m' 14,000
m'
m'
m' 127,000
m' 85,000
m' 42,000
m' 82,000
m' 56,000
m' 27,000
m' 18,000
m' 84,000
m' 57,000
m' 52,000
m' 28,000
m' 67,000
m' 46,000
m' 23,000
m' 69,000
m' 46,000
m' 24,000
m' 340,000
m' 224,000
m' 127,000
m' 76,000
m' 56,000
m' 40,000
m' 25,000
m' 18,000
m' 15,000
m' 11,000
m' 9,000
m' 73,000
m' 51,000
m' 36,000
m' 23,000
m' 88,000
m' 62,000
m' 44,000
m' 28,000
m' 1,254,000
m' 894,000
m' 554,000
m' 298,000
m' 202,000
m' 138,000
m' 95,000
m' 59,000
m' 39,000
m' 30,000
m' 28,000
m' 156,000
m' 110,000
m' 84,000
m' 64,000
m' 34,000
m' 31,000
m' 29,000
m' 24,000
m' 440,000
m' 276,000
m' 261,000
m' 907,000
m' 765,000
m' 547,000
m' 372,000
m' 274,000
m' 151,000
m' 112,000
m'
m' 5,822,000
m' 3,812,000
m' 2,772,000
m' 2,218,000
m' 1,872,000
m'
m' 2,010,000
m' 1,179,000
m' 901,000
m' 693,000
m' 513,000
m' 385,000
m' 275,000
m' 375,000
m' 253,000
m' 164,000
m' 134,000
Buah 153,000
bh 55,000
Buah 38,000
Buah 44,000
Buah 59,000
Buah 71,000
Buah 222,000
Buah 499,000
Buah 585,000
Buah 585,000
Buah 222,000
Buah 499,000
Buah 274,000
Buah 263,000
Buah 274,000
Buah 301,000
Buah 28,000
Buah 33,000
Buah 110,000
Buah 13,000
Buah 39,000
Buah 46,000
Kg 10,000
Set. 44,000
Buah 24,000
Buah 9,000
Buah 3,000
Buah 92,800
Buah 219,000
Buah 54,000
Buah 54,000
Buah 69,000
Buah 69,000
Buah 22,000
Buah 28,000
Buah 15,000
Buah 17,000
Buah 9,000
Buah 39,000
Buah 28,000
Buah 55,000
buah 110,000
Buah 82,000
Buah 12,000
Buah 1,764,000
Buah 1,309,000
Buah 512,000
Buah 90,000
Buah 102,000
Buah 236,000
Buah 28,000
Buah 9,000
Buah 40,000
Buah 10,000
Buah 9,000
Buah 4,000
Buah 3,000
Buah 23,000
Buah 28,000
Buah 33,000
Buah 137,000
unit 110,000
Buah 39,000
Buah 22,000
Buah 82,000
Buah 164,000
Buah 219,000
Buah 328,000
Buah 328,000
Buah 17,000
Buah 192,000
Buah 83,000
Buah 73,000
Buah 10,000
Buah 13,000
Buah 8,000
Buah 2,000
Buah 9,000
Buah 30,000
Buah 4,000
Buah 61,000
Buah 328,000
Buah 575,000
Buah 48,000
Buah 148,000
Buah 175,000
Buah 219,000
Buah 27,000
Buah 2,157,000
Buah 5,000
Buah 11,000
Buah 9,000
Buah 6,000
Buah 26,000
Buah 40,000
Buah 120,000
Buah 60,000
Buah 16,000
Buah 53,000
Buah 13,000
Buah 17,000
Buah 3,000
Buah 5,000
Buah 24,000
Buah 186,000
Buah 229,000
Buah 11,000
Buah 2,000
Buah 17,000
Buah 38,000
Buah 117,000
Buah 176,000
Buah 176,000
buah 110,000
buah 110,000
buah 137,000
buah 137,000
buah 164,000
buah 164,000
buah 219,000
Buah 274,000
Buah 328,000
Buah 137,000
Buah 164,000
Buah 246,000
Buah 1,652,000
Buah 1,226,000
Buah 1,100,000
Buah 545,000
Buah 358,000
Buah 41,000
Buah 59,000
Buah 15,000
Bh 200,000
unit 2,391,000
unit 120,000
unit 962,000
unit 722,000
unit 1,082,000
unit 481,000
M3 276,000
kg 25,000
kg 23,000
liter 290,000
Unit 5,216,000
bh 841,000
unit 29,490,000
unit 29,137,000
unit 17,962,000
unit 20,277,000
unit 20,887,000
unit 23,326,000
unit 23,964,000
unit 38,101,000
unit 32,465,000
unit 47,617,000
unit 64,653,000
unit 64,653,000
unit 43,307,000
unit 47,968,000
unit 49,916,000
unit 51,951,000
unit 66,399,000
unit 68,309,000
unit 68,309,000
unit 17,602,000
unit 19,805,000
unit 22,523,000
unit 23,410,000
unit 30,575,000
unit 55,787,000
unit 58,392,000
unit 73,818,000
unit 22,897,000
unit 26,528,000
unit 30,603,000
unit 40,485,000
unit 45,405,000
lembar 1,220,000
lembar 2,433,000
lembar 158,000
lembar 209,000
m2 65,000
m2 56,000
bh 18,000
bh 29,000
bh 53,000
m2 261,000
m2 147,000
m' 158,000
m' 51,000
m' 85,000
m' 73,000
m' 39,000
m' 39,000
set 85,000
m2 136,000
m' 51,000
bh 107,000
bh 147,000
set 51,000 0.8
bh 51,000 0.575
bh 51,000 0.5
pcs 28,000 0.45
lembar 454,000 2.325
lembar 681,000
lembar 794,000 2.334337
lembar 908,000
lembar 1,248,000
lembar 1,589,000
lembar 2,043,000 0.996
lembar 124,000
lembar 198,000
lembar 221,000
bh 45,000
bh 28,000
lbr 124,000
unit 1,500,000
unit 750,000
unit 2,000,000
unit 64,000
unit 50,000
unit 250,000
unit 45,000
unit 28,300
DAFTAR HARGA SATUAN UPAH, BAHAN DAN PERALATAN
HARGA
NO URAIAN SATUAN SATUAN
Rp.
1 2 3 4
II BAHAN/MATERIAL
A BAHAN DASAR
BATU KALI
1 Batu pecah 0,5/1 (pecah mesin) ( chip ) M3 315,000
2 Batu pecah 1/2 (pecah mesin) M3 315,000
3 Batu pecah 2/3 (pecah mesin) M3 297,000
4 Batu pecah 3/5 (pecah mesin) M3 297,000
5 Batu pecah 4/6 (pecah tangan) M3 270,000
6 Batu pecah 5/7 (pecah tangan) M3 270,000
7 Batu belah / pecah 7/10 - 10/15 - 15/20 M3 315,000
8 Batu belah/pecah besar M3 297,000
9 Batu blondhos M3 180,000
BATU BATA
1 Batu Bata biasa Buah 810
PASIR
1 Pasir beton M3 342,000
2 Pasir pasang M3 342,000
3 Pasir urug M3 128,700
4 Sirtu M3 198,000
TANAH
1 Tanah Lempung M3 45,000
2 Tanah Padas M3 72,000
3 Tanah urug M3 67,500
PORTLAND CEMENT
1 PC / Cement (40 Kg) Zak 45,500
PC / Cement Kg 1,138
HARGA
NO URAIAN SATUAN SATUAN
Rp.
KRUING
1 Kayu Kruing (Balok) M3 7,020,000
2 Kayu Kruing (papan) M3 11,700,000
3 Kayu Kruing 2/3 M3 6,435,000
4 Kayu Kruing 3/5 M3 6,435,000
5 Kayu Kruing 5/7 M3 6,435,000
MERANTI
1 Kayu Meranti (Balok) M3 4,770,000
2 Kayu Meranti (papan) M3 5,400,000
3 Kayu Meranti 2/3 M3 5,040,000
4 Kayu Meranti 3/5 M3 5,040,000
5 Kayu Meranti 5/7 M3 5,040,000
KAMPER
1 Kayu kamfer (balok) M3 7,650,000
2 Kayu Kamfer (papan) M3 9,900,000
3 Kayu kamfer 2/3 M3 7,110,000
4 Kayu kamfer 3/5 M3 7,110,000
5 Kayu kamfer 5/7 M3 7,110,000
LANAN
1 Kayu Lanan/Tahun papan M3 3,690,000
2 Kayu Lanan/Tahun Balok 8/12 M3 3,690,000
3 Kayu Lanan/Tahun Balok 6/12 M3 3,253,500
4 Kayu Lanan/Tahun Usuk 5/7 M3 2,700,000
5 Kayu Lanan/Tahun Usuk 4/6 M3 990,000
6 Kayu Lanan/Tahun Reng 3/5 M3 990,000
7 Kayu Lanan/Tahun Reng 2/3 M3 990,000
SENGON
1 Kayu Sengon Balok 8/12 M3 3,150,000
2 Kayu Sengon Balok 6/12 M3 2,970,000
3 Kayu Sengon Usuk 5/7 M3 2,700,000
4 Kayu Sengon Usuk 4/6 M3 2,340,000
5 Kayu Sengon Reng 3/5 M3 2,340,000
HARGA
NO URAIAN SATUAN SATUAN
Rp.
DOLKEN
1 Kayu dolok DN / Dolken 8-10 cm Batang 15,750
2 Kayu cetakan M3 3,060,000
3 Kayu bakar M3 126,000
4 Bambu Ø 8-10 cm p = 4 m Batang 11,250
5 Bambu Ø 10-12 cm p = 4 m Batang 21,150
6 Batang kelapa 4 m Batang 360,000
7 Sesek bambu M2 9,000
8 Bilik Bambu M2 20,250
TEAKWOOD
1 Taek wood 90 x 210 x 4 mm Lembar 67,500
2 Taek wood 90 x 210 x 9 mm Lembar 103,500
MULTIPLEK
1 Multiplek 120 x 240 x 6 mm Lembar 81,000
2 Multiplek 120 x 240 x 9 mm Lembar 99,000
3 Multiplek 120 x 240 x 12 mm Lembar 126,000
TRIPLEK
1 Triplek 120 x 240 x 3 mm Lembar 63,900
Triplek 120 x 240 x 4 mm Lembar 67,500
2 Triplek 120 x 240 x 5 mm Lembar 72,000
F BAHAN BESI
BESI BETON
1 Besi beton polos SNI Kg 9,450
2 Besi beton ulir SNI Kg 9,450
4 Besi sengkang (angkur, baut) Kg 8,100
KAWAT
HARGA
NO URAIAN SATUAN SATUAN
Rp.
L BAHAN SANITAIR
1 Kloset duduk lengkap Buah 1,600,000
2 Wastafel INA Bh 171,000
N BAHAN LAIN-LAIN
1 Air M3 72,000
2 Air Ltr 72
3 Minyak Oli/Pelumas Liter 27,000
4 Sabun Kg 9,000
5 Sealer Tube 51,750
6 Soda Api Kg 16,200
7 Solar Liter 8,100
8 Elastomer Buah 495,000
Penyedia Jasa
MATERIAL YANG DIGUNAKAN CV. CIPTA KARYA MANDIRI
CEK HARGA KARENA HARGA BARU / HARGA 2017
KARENA HARGA DIGUNAKAN PADA ANALISA
MATERIAL PELEGKAP BARU PERMINTAAN MAS AJIE'
HARGA DI CEK ULANG
PEKERJAAN : REHAB PELEBARAN JALAN KANTOR PP-PAUD DAN DIKMAS JAWA TENGAH
LOKASI : KANTOR PP-PAUD DAN DIKMAS JAWA TENGAH
TAHUN ANGARAN : 2019
A PEKERJAAN PERSIAPAN
1 Uitzet Lapangan dan Pembersihan 1.00 Ls 500,000.00 500,000.00
2 Buang Bongkaran Keluar Lokasi 1.00 Ls 1,800,000.00 1,800,000.00
JUMLAH 2,300,000.00
B REHAB SALURAN
1 Bongkar Plat Beton Existing 2.85 m3 1,109,750.00 3,162,787.50
2 Bongkar rolag Bata 4.56 m3 607,579.50 2,770,562.52
3 Pasangan Batu Belah 1:5 1.20 m3 1,003,157.08 1,203,788.49
4 Pasangan Bata 1:5 26.55 m2 130,704.40 3,470,201.82
5 Plesteran 53.10 m2 94,753.10 5,031,389.61
6 Urugan Pasir Bawah rolag 0.76 m2 115,143.75 87,509.25
7 Rolag Bata 1:5 4.56 m3 1,188,221.82 5,418,291.49
8 Pasangan Keramik 30x30 cm Unpholish 15.96 m3 177,315.26 2,829,951.50
9 Beton Lantai Saluran 1.14 m3 1,136,943.80 1,296,115.94
10 Membuat Grill Besi 6.00 m1 450,000.00 2,700,000.00
11 Membuat Bak Kontrol 1.00 bh 794,231.40 794,231.40
12 Cor Beton Penutup Saluran 4.56 m3 1,491,945.52 6,803,271.56
13 Pembesian 141.36 kg 13,027.03 1,841,500.61
14 Bekisting Plat 28.50 m3 314,881.50 8,974,122.75
JUMLAH 46,383,724.44
JUMLAH TOTAL 48,683,724.44
PPN 10% 4,868,372.44
JUMLAH TOTAL + PPN 10% 53,552,096.88
DIBULATKAN 53,552,000.00
RENCANA ANGGARAN BIAYA
PEKERJAAN : REHAB PELEBARAN JALAN KANTOR PP-PAUD DAN DIKMAS JAWA TENGAH
LOKASI : KANTOR PP-PAUD DAN DIKMAS JAWA TENGAH
TAHUN ANGARAN : 2019
A PEKERJAAN PERSIAPAN
1 Uitzet Lapangan dan Pembersihan 1.00 Ls 500,000.00 500,000.00
2 Buang Bongkaran Keluar Lokasi 1.00 Ls 2,000,000.00 2,000,000.00
JUMLAH 2,500,000.00
B REHAB SALURAN
1 Bongkar Plat Beton Existing 2.85 m3 1,109,750.00 3,162,787.50
2 Bongkar rolag Bata 4.56 m3 607,579.50 2,770,562.52
3 Pasangan Bata 1:5 39.90 m2 130,704.40 5,215,105.56
4 Plesteran 39.90 m2 94,753.10 3,780,648.69
5 Acian 39.90 m2 54,165.00 2,161,183.50
6 Beton Lantai Saluran 1.14 m3 1,136,943.80 1,296,115.94
7 Membuat Grill Besi 6.00 m1 450,000.00 2,700,000.00
8 Membuat Bak Kontrol 2.00 bh 794,231.40 1,588,462.80
9 Cor Beton Penutup Saluran 4.06 m3 1,491,945.52 6,057,298.80
10 Pembesian 141.36 kg 13,027.03 1,841,500.61
11 Bekisting Plat 28.5 m3 314,881.50 8,974,122.75
JUMLAH 39,547,788.67
JUMLAH TOTAL 42,047,788.67
PPN 10% 4,204,778.87
JUMLAH TOTAL + PPN 10% 46,252,567.53
DIBULATKAN 46,252,000.00
PEKERJAAN : REHAB KAMAR MANDI KANTOR PP-PAUD DAN DIKMAS JAWA TENGAH
LOKASI : KANTOR PP-PAUD DAN DIKMAS JAWA TENGAH
TAHUN ANGARAN : 2019
A PEKERJAAN PERSIAPAN
1 Uitzet Lapangan dan Pembersihan 1.00 Ls 500,000.00 500,000.00
2 Buang Bongkaran Keluar Lokasi 1.00 Ls 2,000,000.00 2,000,000.00
JUMLAH 2,500,000.00
B REHAB KAMAR MANDI DAN INSTALASINYA
1 Bongkar Closed Lama 1.00 Ls 350,000.00 350,000.00
2 Bongkar Wastvel Lama 1.00 Ls 250,000.00 250,000.00
3 Closed Duduk 1.00 bh 2,326,570.75 2,326,570.75
4 Jet Shower 1.00 bh 250,000.00 250,000.00
5 Kran Air 1.00 bh 71,471.93 71,471.93
6 Kran Air Wastavel 1.00 bh 200,000.00 200,000.00
7 Wastavel 1.00 bh 399,182.25 399,182.25
8 Pasang Pipa PVC 3 inci 6.00 m1 142,527.26 855,163.58
9 Pasang Pipa PVC 3/4 Inci 15.00 m1 26,827.20 402,408.00
10 Bongkaran Rabat Beton Existing 2.81 m3 1,109,750.00 3,114,790.81
11 Urugan Pasir Bawah Rabat 1.48 m3 115,143.75 170,412.75
12 Keramik Lantai 40x40 cm 28.07 m2 272,253.44 7,641,473.53
13 Pembuatan Taman 1.00 Ls 2,000,000.00 2,000,000.00
JUMLAH 18,031,473.59
JUMLAH TOTAL 20,531,473.59
PPN 10% 2,053,147.36
JUMLAH TOTAL + PPN 10% 22,584,620.95
DIBULATKAN 22,584,000.00
A PEKERJAAN PERSIAPAN
1 Uitzet Lapangan dan Pembersihan 1.00 Ls 500,000.00 500,000.00
2 Buang Bongkaran Keluar Lokasi 1.00 Ls 1,000,000.00 1,000,000.00
JUMLAH 1,500,000.00
B REHAB SALURAN
1 Bongkar rolag Bata 1.91 m3 607,579.50 1,162,907.16
2 Rolag Bata 1:5 1.91 m3 Err:509 Err:509
3 Pasangan Keramik Lantai 60x60 cm 35.13 m2 271,711.65 9,546,099.74
4 Pasang Keramik Lantai 30x30 cm 9.00 m2 177,315.26 1,595,837.31
5 Cor Beton Lantai Akses Difable 1.88 m3 1,083,134.56 2,030,877.31
6 Pasang Karpet Lantai Difable 6.25 m2 260,000.00 1,625,000.00
7 Pembuatan Railing Akses Difable 6.00 m2 1,500,000.00 9,000,000.00
JUMLAH Err:509
JUMLAH TOTAL Err:509
PPN 10% Err:509
JUMLAH TOTAL + PPN 10% Err:509
DIBULATKAN Err:509
UNGARAN, 2019
CV. CIPTA KARYA MANDIRI
PEKERJAAN :
LOKASI :
TAHUN ANGARAN :
NO URAIAN PEKERJAAN
A PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan
2 Administrasi Proyek
JUMLAH
B PEKERJAAN TEMPAT PARKIR
1 Galian Tanah 1.00 x 1.00 x 1.50 x 6
3 Pondasi Footplat
→ Beton 1.00 x 1.00 x 0.20 x 6.00
1/2 x 1.00 x 1.00 x 0.15 x 6.00
→ Tali Pancang
VOLUME
1.00 Ls
1.00 Ls
9.00 m3
0.60 11.10 m3
10.50
1.20 1.65 m3
0.45
4.80 4.80 m2
56.29 112.58 kg
56.29
3.00 m3
39.00 m2
125.08 199.10 kg
74.01
0.63 0.63 m3
8.40 8.40 m2
51.81 51.81 kg
1.05 1.45 m3
0.40
8.40 11.60 m2
3.20
51.81 71.55 kg
19.74
12.60 17.40 m3
4.80
309.92 309.92 kg
42.47 kg
48.00 bh
109.20 m2
8.00 bh
21.00 m1
16.00 m1
109.20 m2
0.32 m3
A. 4.5.1.HARGA SATUAN PEKERJAAN LANGIT-LANGIT
A. 4.5.1.1 Pemasangan 1 m2 Langit-langit Asbes semen , tebal 4 mm, 5 mm dan 6 mm 29,461.28
A TENAGA
Pekerja L.01 OH 0.03 67,500.00 2,025.00
Tukang Kayu L.02 OH 0.07 81,000.00 5,670.00
Kepala Tukang L.03 OH 0.007 85,500.00 598.50
Mandor L.04 OH 0.004 90,000.00 360.00
JUMLAH TENAGA KERJA 8,653.50
B BAHAN
Plat Asbes Lbr 1.1 15,300.00 16,830.00
Paku Kg 0.01 13,500.00 135.00
JUMLAH HARGA BAHAN 16,965.00
C PERALATAN
D Jumlah A + B + C 25,618.50
E Overhead & Profit 15% x D 3,842.78
F Harga Satuan Pekerjaan (D+E) 29,461.28
A TENAGA
Pekerja L.01 OH 0.03 67,500.00 2,025.00
Tukang Kayu L.02 OH 0.07 81,000.00 5,670.00
Kepala Tukang L.03 OH 0.007 85,500.00 598.50
Mandor L.04 OH 0.004 90,000.00 360.00
JUMLAH TENAGA KERJA 8,653.50
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah A + B + C 8,653.50
E Overhead & Profit 15% x D 1,298.03
F Harga Satuan Pekerjaan (D+E) 9,951.53
A TENAGA
Pekerja L.01 OH 0.12 67,500.00 8,100.00
Tukang Kayu L.02 OH 0.12 81,000.00 9,720.00
Kepala Tukang L.03 OH 0.012 85,500.00 1,026.00
Mandor L.04 OH 0.006 90,000.00 540.00
JUMLAH TENAGA KERJA 19,386.00
B BAHAN
Akustik Uk.30 x 30 cm Lbr 12.0 4,950.00 59,400.00
Paku Kg 0.05 13,500.00 675.00
JUMLAH HARGA BAHAN 60,075.00
C PERALATAN
D Jumlah A + B + C 79,461.00
E Overhead & Profit 15% x D 11,919.15
F Harga Satuan Pekerjaan (D+E) 91,380.15
A TENAGA
Pekerja L.01 OH 0.12 67,500.00 8,100.00
Tukang Kayu L.02 OH 0.12 81,000.00 9,720.00
Kepala Tukang L.03 OH 0.012 85,500.00 1,026.00
Mandor L.04 OH 0.006 90,000.00 540.00
JUMLAH TENAGA KERJA 19,386.00
B BAHAN
Akustik Uk.30 x 60 cm Lbr 5.80 12,870.00 74,646.00
Paku Kg 0.05 13,500.00 675.00
JUMLAH HARGA BAHAN 75,321.00
C PERALATAN
D Jumlah A + B + C 94,707.00
E Overhead & Profit 15% x D 14,206.05
F Harga Satuan Pekerjaan (D+E) 108,913.05
A TENAGA
Pekerja L.01 OH 0.10 67,500.00 6,750.00
Tukang Kayu L.02 OH 0.10 81,000.00 8,100.00
Kepala Tukang L.03 OH 0.01 85,500.00 855.00
Mandor L.04 OH 0.005 90,000.00 450.00
JUMLAH TENAGA KERJA 16,155.00
B BAHAN
Akustik Uk.30 x 120 cm Lbr 1.50 39,600.00 59,400.00
Paku Kg 0.05 13,500.00 675.00
JUMLAH HARGA BAHAN 60,075.00
C PERALATAN
D Jumlah A + B + C 76,230.00
E Overhead & Profit 15% x D 11,434.50
F Harga Satuan Pekerjaan (D+E) 87,664.50
A. 4.5.1.5 Memasang 1 m2 Langit-langit Tripleks Uk (120x240) cm, Tebal 3 mm, 4 mm & 6 mm 46,600.88
A TENAGA
Pekerja L.01 OH 0.10 67,500.00 6,750.00
Tukang Kayu L.02 OH 0.10 81,000.00 8,100.00
Kepala Tukang L.03 OH 0.01 85,500.00 855.00
Mandor L.04 OH 0.005 90,000.00 450.00
JUMLAH TENAGA KERJA 16,155.00
B BAHAN
Tripleks (4 mm) Lbr 0.375 63,900.00 23,962.50
Paku Tripleks Kg 0.03 13,500.00 405.00
JUMLAH HARGA BAHAN 24,367.50
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.8 67,500.00 54,000.00
Tukang Kayu L.02 OH 0.8 81,000.00 64,800.00
Kepala Tukang L.03 OH 0.08 85,500.00 6,840.00
Mandor L.04 OH 0.04 90,000.00 3,600.00
JUMLAH TENAGA KERJA 129,240.00
B BAHAN
Kayu Jati,Papan m3 0.015 18,450,000.00 276,750.00
Paku Kg 0.01 13,500.00 135.00
JUMLAH HARGA BAHAN 276,885.00
C PERALATAN
D Jumlah A + B + C 406,125.00
E Overhead & Profit 15% x D 60,918.75
F Harga Satuan Pekerjaan (D+E) 467,043.75
A TENAGA
Pekerja L.01 OH 0.1 67,500.00 6,750.00
Tukang Kayu L.02 OH 0.05 81,000.00 4,050.00
Kepala Tukang L.03 OH 0.005 85,500.00 427.50
Mandor L.04 OH 0.005 90,000.00 450.00
JUMLAH TENAGA KERJA 11,677.50
B BAHAN
Gypsum Board Lbr 0.364 62,100.00 22,604.40
Paku Sekrup Kg 0.11 10,350.00 1,138.50
JUMLAH HARGA BAHAN 23,742.90
C PERALATAN
D Jumlah A + B + C 35,420.40
E Overhead & Profit 15% x D 5,313.06
F Harga Satuan Pekerjaan (D+E) 40,733.46
A TENAGA
Pekerja L.01 OH 0.5 67,500.00 33,750.00
Tukang Kayu L.02 OH 0.5 81,000.00 40,500.00
Kepala Tukang L.03 OH 0.05 85,500.00 4,275.00
Mandor L.04 OH 0.025 90,000.00 2,250.00
JUMLAH TENAGA KERJA 80,775.00
B BAHAN
Profil Allumunium "T" m' 3.6 3,600.00 12,960.00
Kawat Ø 4 mm kg 0.15 6,300.00 945.00
Ramset bh 1.05 19,800.00 20,790.00
Akuatik 60 x 120 cm lmb 1.5 12,870.00 19,305.00
JUMLAH HARGA BAHAN 54,000.00
C PERALATAN
D Jumlah A + B + C 134,775.00
E Overhead & Profit 15% x D 20,216.25
F Harga Satuan Pekerjaan (D+E) 154,991.25
A TENAGA
Pekerja L.01 OH 0.05 67,500.00 3,375.00
Tukang Kayu L.02 OH 0.05 81,000.00 4,050.00
Kepala Tukang L.03 OH 0.005 85,500.00 427.50
Mandor L.04 OH 0.003 90,000.00 270.00
JUMLAH TENAGA KERJA 8,122.50
B BAHAN
List Kayu Profil m1 1.05 6,525.00 6,851.25
Paku Kg 0.01 13,500.00 135.00
JUMLAH HARGA BAHAN 6,986.25
C PERALATAN
D Jumlah A + B + C 15,108.75
E Overhead & Profit 15% x D 2,266.31
F Harga Satuan Pekerjaan (D+E) 17,375.06
A TENAGA
Pekerja L.01 OH 0.1 67,500.00 6,750.00
Tukang Kayu L.02 OH 0.05 81,000.00 4,050.00
Kepala Tukang L.03 OH 0.005 85,500.00 427.50
Mandor L.04 OH 0.005 90,000.00 450.00
JUMLAH TENAGA KERJA 11,677.50
B BAHAN
Kalsi Board Lbr 0.364 62,100.00 22,604.40
Paku Sekrup Kg 0.11 10,350.00 1,138.50
JUMLAH HARGA BAHAN 23,742.90
C PERALATAN
D Jumlah A + B + C 35,420.40
E Overhead & Profit 15% x D 5,313.06
F Harga Satuan Pekerjaan (D+E) 40,733.46
A TENAGA
Pekerja L.01 OH 0.1 67,500.00 6,750.00
Tukang Kayu L.02 OH 0.05 81,000.00 4,050.00
Kepala Tukang L.03 OH 0.005 85,500.00 427.50
Mandor L.04 OH 0.005 90,000.00 450.00
JUMLAH TENAGA KERJA 11,677.50
B BAHAN
Gypsum Board Lbr 0.364 62,100.00 22,604.40
Paku Sekrup Kg 0.11 10,350.00 1,138.50
D Jumlah A + B + C 35,420.40
E Overhead & Profit 15% x D 5,313.06
F Harga Satuan Pekerjaan (D+E) 40,733.46
A. 4.5.1.7c Memasang 1 m2 Langit-langit PVC 304,538.40
A TENAGA
Pekerja L.01 OH 0.100 67,500.00 6,750.00
Tukang Kayu L.02 OH 0.050 81,000.00 4,050.00
Kepala Tukang L.03 OH 0.005 85,500.00 427.50
Mandor L.04 OH 0.005 90,000.00 450.00
JUMLAH TENAGA KERJA 11,677.50
B BAHAN
Plafond PVC m2 1.000 252,000.00 252,000.00
Paku Sekrup Kg 0.110 10,350.00 1,138.50
D Jumlah A + B + C 264,816.00
E Overhead & Profit 15% x D 39,722.40
F Harga Satuan Pekerjaan (D+E) 304,538.40
A TENAGA
Pekerja L.01 OH 0.060 67,500.00 4,050.00
Tukang Kayu L.02 OH 0.060 81,000.00 4,860.00
Kepala Tukang L.03 OH 0.006 85,500.00 513.00
Mandor L.04 OH 0.003 90,000.00 270.00
JUMLAH TENAGA KERJA 9,693.00
B BAHAN
List Gypsum m' 1.050 13,950.00 14,647.50
Tepung Gypsum Kg 0.15 6,750.00 1,012.50
D Jumlah A + B + C 25,353.00
E Overhead & Profit 15% x D 3,802.95
F Harga Satuan Pekerjaan (D+E) 29,155.95
A. 4.5.2.HARGA SATUAN PEKERJAAN PENUTUP ATAP
A. 4.5.2.1 Pemasangan 1 m2 Atap Genteng Plentong Kecil 90,057.94
A TENAGA
Pekerja L.01 OH 0.150 67,500.00 10,125.00
Tukang Kayu L.02 OH 0.075 81,000.00 6,075.00
Kepala Tukang L.03 OH 0.008 85,500.00 641.25
Mandor L.04 OH 0.008 90,000.00 720.00
JUMLAH TENAGA KERJA 17,561.25
B BAHAN
Genteng Plentong Buah 25.000 2,430.00 60,750.00
JUMLAH HARGA BAHAN 60,750.00
C PERALATAN
D Jumlah A + B + C 78,311.25
E Overhead & Profit 15% x D 11,746.69
F Harga Satuan Pekerjaan (D+E) 90,057.94
A TENAGA
Pekerja L.01 OH 0.150 67,500.00 10,125.00
Tukang Kayu L.02 OH 0.075 81,000.00 6,075.00
Kepala Tukang L.03 OH 0.008 85,500.00 684.00
Mandor L.04 OH 0.008 90,000.00 720.00
JUMLAH TENAGA KERJA 17,604.00
B BAHAN
Genteng Kodok / Glasur Buah 25.000 2,520.00 63,000.00
JUMLAH HARGA BAHAN 63,000.00
C PERALATAN
D Jumlah A + B + C 80,604.00
E Overhead & Profit 15% x D 12,090.60
F Harga Satuan Pekerjaan (D+E) 92,694.60
A TENAGA
Pekerja L.01 OH 0.150 67,500.00 10,125.00
Tukang Kayu L.02 OH 0.075 81,000.00 6,075.00
Kepala Tukang L.03 OH 0.008 85,500.00 684.00
Mandor L.04 OH 0.008 90,000.00 720.00
JUMLAH TENAGA KERJA 17,604.00
B BAHAN
Genteng Plentong Super / Besar Buah 18.000 3,510.00 63,180.00
JUMLAH HARGA BAHAN 63,180.00
C PERALATAN
D Jumlah A + B + C 80,784.00
E Overhead & Profit 15% x D 12,117.60
F Harga Satuan Pekerjaan (D+E) 92,901.60
A TENAGA
Pekerja L.01 OH 0.400 67,500.00 27,000.00
Tukang Kayu L.02 OH 0.200 81,000.00 16,200.00
Kepala Tukang L.03 OH 0.020 85,500.00 1,710.00
Mandor L.04 OH 0.002 90,000.00 180.00
JUMLAH TENAGA KERJA 45,090.00
B BAHAN
Genteng Bubung Plentong Buah 5.000 6,300.00 31,500.00
Portland Semen Kg 8.000 1,137.50 9,100.00
Pasir Pasang m3 0.032 342,000.00 10,944.00
JUMLAH HARGA BAHAN 51,544.00
C PERALATAN
D Jumlah A + B + C 96,634.00
E Overhead & Profit 15% x D 14,495.10
F Harga Satuan Pekerjaan (D+E) 111,129.10
A TENAGA
Pekerja L.01 OH 0.400 67,500.00 27,000.00
Tukang Kayu L.02 OH 0.200 81,000.00 16,200.00
Kepala Tukang L.03 OH 0.020 85,500.00 1,710.00
Mandor L.04 OH 0.002 90,000.00 180.00
JUMLAH TENAGA KERJA 45,090.00
B BAHAN
Genteng Bubung Kodok / Glasur Buah 5.000 4,860.00 24,300.00
Portland Semen Kg 8.000 1,137.50 9,100.00
Pasir Pasang m3 0.032 342,000.00 10,944.00
JUMLAH HARGA BAHAN 44,344.00
C PERALATAN
D Jumlah A + B + C 89,434.00
E Overhead & Profit 15% x D 13,415.10
F Harga Satuan Pekerjaan (D+E) 102,849.10
A TENAGA
Pekerja L.01 OH 0.400 67,500.00 27,000.00
Tukang Kayu L.02 OH 0.200 81,000.00 16,200.00
Kepala Tukang L.03 OH 0.020 85,500.00 1,710.00
Mandor L.04 OH 0.002 90,000.00 180.00
JUMLAH TENAGA KERJA 45,090.00
B BAHAN
Genteng Bubung Plentong Besar Buah 4.000 6,750.00 27,000.00
Portland Semen Kg 8.000 1,137.50 9,100.00
Pasir Pasang m3 0.032 342,000.00 10,944.00
JUMLAH HARGA BAHAN 47,044.00
C PERALATAN
D Jumlah A + B + C 92,134.00
E Overhead & Profit 15% x D 13,820.10
F Harga Satuan Pekerjaan (D+E) 105,954.10
A TENAGA
Pekerja L.01 OH 0.140 67,500.00 9,450.00
Tukang Kayu L.02 OH 0.075 81,000.00 6,075.00
Kepala Tukang L.03 OH 0.008 85,500.00 684.00
Mandor L.04 OH 0.008 90,000.00 720.00
JUMLAH TENAGA KERJA 16,929.00
B BAHAN
Asbes Gelombang Lbr 0.600 71,550.00 42,930.00
Paku Pancing 60 x 230 Kg 0.120 14,850.00 1,782.00
JUMLAH HARGA BAHAN 44,712.00
C PERALATAN
D Jumlah A + B + C 61,641.00
E Overhead & Profit 15% x D 9,246.15
F Harga Satuan Pekerjaan (D+E) 70,887.15
A TENAGA
Pekerja L.01 OH 0.140 67,500.00 9,450.00
Tukang Kayu L.02 OH 0.070 81,000.00 5,670.00
Kepala Tukang L.03 OH 0.007 85,500.00 598.50
Mandor L.04 OH 0.007 90,000.00 630.00
JUMLAH TENAGA KERJA 16,348.50
B BAHAN
Asbes Gelombang Lbr 0.600 63,000.00 37,800.00
Paku Pancing 60 x 230 Kg 0.120 14,850.00 1,782.00
JUMLAH HARGA BAHAN 39,582.00
C PERALATAN
D Jumlah A + B + C 55,930.50
E Overhead & Profit 15% x D 8,389.58
F Harga Satuan Pekerjaan (D+E) 64,320.08
A TENAGA
Pekerja L.01 OH 0.140 67,500.00 9,450.00
Tukang Kayu L.02 OH 0.070 81,000.00 5,670.00
Kepala Tukang L.03 OH 0.007 85,500.00 598.50
Mandor L.04 OH 0.007 90,000.00 630.00
JUMLAH TENAGA KERJA 16,348.50
B BAHAN
Asbes Gelombang Lbr 0.350 84,150.00 29,452.50
Paku Pancing 60 x 230 Kg 0.120 14,850.00 1,782.00
JUMLAH HARGA BAHAN 31,234.50
C PERALATAN
D Jumlah A + B + C 47,583.00
E Overhead & Profit 15% x D 7,137.45
F Harga Satuan Pekerjaan (D+E) 54,720.45
A TENAGA
Pekerja L.01 OH 0.140 67,500.00 9,450.00
Tukang Kayu L.02 OH 0.070 81,000.00 5,670.00
Kepala Tukang L.03 OH 0.007 85,500.00 598.50
Mandor L.04 OH 0.007 90,000.00 630.00
JUMLAH TENAGA KERJA 16,348.50
B BAHAN
Asbes Gelombang Lbr 0.510 58,860.00 30,018.60
Paku Pancing 60 x 230 Kg 0.120 14,850.00 1,782.00
JUMLAH HARGA BAHAN 31,800.60
C PERALATAN
D Jumlah A + B + C 48,149.10
E Overhead & Profit 15% x D 7,222.37
F Harga Satuan Pekerjaan (D+E) 55,371.47
A TENAGA
Pekerja L.01 OH 0.200 67,500.00 13,500.00
Tukang Kayu L.02 OH 0.100 81,000.00 8,100.00
Kepala Tukang L.03 OH 0.010 85,500.00 855.00
Mandor L.04 OH 0.010 90,000.00 900.00
JUMLAH TENAGA KERJA 23,355.00
B BAHAN
Genteng Beton Standrad Lbr 11.000 6,930.00 76,230.00
Paku Biasa 2" - 5" Kg 0.030 13,500.00 405.00
JUMLAH HARGA BAHAN 76,635.00
C PERALATAN
D Jumlah A + B + C 99,990.00
E Overhead & Profit 15% x D 14,998.50
F Harga Satuan Pekerjaan (D+E) 114,988.50
A TENAGA
Pekerja L.01 OH 0.200 67,500.00 13,500.00
Tukang Kayu L.02 OH 0.100 81,000.00 8,100.00
Kepala Tukang L.03 OH 0.010 85,500.00 855.00
Mandor L.04 OH 0.010 90,000.00 900.00
JUMLAH TENAGA KERJA 23,355.00
B BAHAN
Genteng Metal m2 1.020 90,000.00 91,800.00
Paku Biasa Ø ½" - 1" Kg 0.200 13,500.00 2,700.00
JUMLAH HARGA BAHAN 94,500.00
C PERALATAN
D Jumlah A + B + C 117,855.00
E Overhead & Profit 15% x D 17,678.25
F Harga Satuan Pekerjaan (D+E) 135,533.25
A TENAGA
Pekerja L.01 OH 0.200 67,500.00 13,500.00
Tukang Kayu L.02 OH 0.100 81,000.00 8,100.00
Kepala Tukang L.03 OH 0.010 85,500.00 855.00
Mandor L.04 OH 0.010 90,000.00 900.00
JUMLAH TENAGA KERJA 23,355.00
B BAHAN
Genteng Metal Pasir m2 1.020 112,500.00 114,750.00
Paku Biasa Ø ½" - 1" Kg 0.200 13,500.00 2,700.00
JUMLAH HARGA BAHAN 117,450.00
C PERALATAN
D Jumlah A + B + C 140,805.00
E Overhead & Profit 15% x D 21,120.75
F Harga Satuan Pekerjaan (D+E) 161,925.75
A TENAGA
Pekerja L.01 OH 0.166 67,500.00 11,205.00
Tukang Kayu L.02 OH 0.250 81,000.00 20,250.00
Kepala Tukang L.03 OH 0.025 85,500.00 2,137.50
Mandor L.04 OH 0.008 90,000.00 720.00
JUMLAH TENAGA KERJA 34,312.50
B BAHAN
Genteng Sirap Lbr 30.000 1,800.00 54,000.00
Paku Biasa 1/2" - 1" Kg 0.200 13,500.00 2,700.00
JUMLAH HARGA BAHAN 56,700.00
C PERALATAN
D Jumlah A + B + C 91,012.50
E Overhead & Profit 15% x D 13,651.88
F Harga Satuan Pekerjaan (D+E) 104,664.38
A TENAGA
Pekerja L.01 OH 0.400 67,500.00 27,000.00
Tukang Kayu L.02 OH 0.200 81,000.00 16,200.00
Kepala Tukang L.03 OH 0.020 85,500.00 1,710.00
Mandor L.04 OH 0.020 90,000.00 1,800.00
JUMLAH TENAGA KERJA 46,710.00
B BAHAN
Nok Genteng Beton Buah 3.500 6,750.00 23,625.00
Paku Biasa 2" - 5" Kg 0.050 13,500.00 675.00
Portland Semen Kg 10.800 1,137.50 12,285.00
Pasir Pasang m3 0.032 342,000.00 10,944.00
Semen Warna Kg 1.000 2,250.00 2,250.00
JUMLAH HARGA BAHAN 49,779.00
C PERALATAN
D Jumlah A + B + C 96,489.00
E Overhead & Profit 15% x D 14,473.35
F Harga Satuan Pekerjaan (D+E) 110,962.35
A TENAGA
Pekerja L.01 OH 0.250 67,500.00 16,875.00
Tukang Kayu L.02 OH 0.150 81,000.00 12,150.00
Kepala Tukang L.03 OH 0.015 85,500.00 1,282.50
Mandor L.04 OH 0.013 90,000.00 1,170.00
JUMLAH TENAGA KERJA 31,477.50
B BAHAN
Nok Genteng Metal Buah 1.100 12,510.00 13,761.00
Paku Biasa 1/2" - 1" Kg 0.050 13,500.00 675.00
JUMLAH HARGA BAHAN 14,436.00
C PERALATAN
D Jumlah A + B + C 45,913.50
E Overhead & Profit 15% x D 6,887.03
F Harga Satuan Pekerjaan (D+E) 52,800.53
A TENAGA
Pekerja L.01 OH 0.250 67,500.00 16,875.00
Tukang Kayu L.02 OH 0.150 81,000.00 12,150.00
Kepala Tukang L.03 OH 0.015 85,500.00 1,282.50
Mandor L.04 OH 0.013 90,000.00 1,170.00
JUMLAH TENAGA KERJA 31,477.50
B BAHAN
Nok Genteng Metal Pasir Buah 1.100 14,400.00 15,840.00
Paku Biasa 2" - 5" Kg 0.050 13,500.00 675.00
JUMLAH HARGA BAHAN 16,515.00
C PERALATAN
D Jumlah A + B + C 47,992.50
E Overhead & Profit 15% x D 7,198.88
F Harga Satuan Pekerjaan (D+E) 55,191.38
A. 4.5.2.37 Pemasangan 1 m' Nok Sirap 46,730.25
A TENAGA
Pekerja L.01 OH 0.125 67,500.00 8,437.50
Tukang Kayu L.02 OH 0.250 81,000.00 20,250.00
Kepala Tukang L.03 OH 0.025 85,500.00 2,137.50
Mandor L.04 OH 0.006 90,000.00 540.00
JUMLAH TENAGA KERJA 31,365.00
B BAHAN
Seng Plaat 3" x 6" BJLS 28 Lbr 0.400 19,800.00 7,920.00
Paku Biasa 1/2" - 1" Kg 0.050 13,500.00 675.00
Paku Biasa 2" - 5" Kg 0.050 13,500.00 675.00
JUMLAH HARGA BAHAN 9,270.00
C PERALATAN
D Jumlah A + B + C 40,635.00
E Overhead & Profit 15% x D 6,095.25
F Harga Satuan Pekerjaan (D+E) 46,730.25
A TENAGA
Pekerja L.01 OH 0.120 67,500.00 8,100.00
Tukang Kayu L.02 OH 0.060 81,000.00 4,860.00
Kepala Tukang L.03 OH 0.006 85,500.00 513.00
Mandor L.04 OH 0.006 90,000.00 540.00
JUMLAH TENAGA KERJA 14,013.00
B BAHAN
Seng Gelombang 3" x 6" BJLS 28 Lbr 0.700 19,800.00 13,860.00
Paku Biasa 1/2" - 1" Kg 0.020 13,500.00 270.00
JUMLAH HARGA BAHAN 14,130.00
C PERALATAN
D Jumlah A + B + C 28,143.00
E Overhead & Profit 15% x D 4,221.45
F Harga Satuan Pekerjaan (D+E) 32,364.45
A TENAGA
Pekerja L.01 OH 0.150 67,500.00 10,125.00
Tukang Kayu L.02 OH 0.070 81,000.00 5,670.00
Kepala Tukang L.03 OH 0.007 85,500.00 598.50
Mandor L.04 OH 0.006 90,000.00 540.00
JUMLAH TENAGA KERJA 16,933.50
B BAHAN
Seng Plaat 3" x 6" BJLS 28 Lbr 0.300 19,800.00 5,940.00
Paku Biasa 1/2" - 1" Kg 0.040 13,500.00 540.00
JUMLAH HARGA BAHAN 6,480.00
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.150 67,500.00 10,125.00
Tukang Kayu L.02 OH 0.050 81,000.00 4,050.00
Kepala Tukang L.03 OH 0.005 85,500.00 427.50
Mandor L.04 OH 0.008 90,000.00 720.00
JUMLAH TENAGA KERJA 15,322.50
B BAHAN
Sisalation / Allumunium Foil m2 1.050 7,650.00 8,032.50
JUMLAH HARGA BAHAN 8,032.50
C PERALATAN
D Jumlah A + B + C 23,355.00
E Overhead & Profit 15% x D 3,503.25
F Harga Satuan Pekerjaan (D+E) 26,858.25
A TENAGA
Pekerja L.01 OH 0.020 67,500.00 1,350.00
Tukang Kayu L.02 OH 0.080 81,000.00 6,480.00
Kepala Tukang L.03 OH 0.010 85,500.00 855.00
Mandor L.04 OH 0.006 90,000.00 540.00
JUMLAH TENAGA KERJA 9,225.00
B BAHAN
Atap Spandek M2 1.100 84,600.00 93,060.00
Screw Cteks 12-4 x 50 bh 6.000 1,500.00 9,000.00
Screw Cteks 10 x 16-16 bh 2.000 900.00 1,800.00
JUMLAH HARGA BAHAN 103,860.00
C PERALATAN
D Jumlah A + B + C 113,085.00
E Overhead & Profit 15% x D 16,962.75
F Harga Satuan Pekerjaan (D+E) 130,047.75
A TENAGA
Pekerja L.01 OH 0.020 67,500.00 1,350.00
Tukang Kayu L.02 OH 0.080 81,000.00 6,480.00
Kepala Tukang L.03 OH 0.010 85,500.00 855.00
Mandor L.04 OH 0.006 90,000.00 540.00
JUMLAH TENAGA KERJA 9,225.00
B BAHAN
Nok Atap Spandek M' 1.100 76,950.00 84,645.00
Screw Cteks 10 x 16-16 bh 6.000 900.00 5,400.00
JUMLAH HARGA BAHAN 90,045.00
C PERALATAN
D Jumlah A + B + C 99,270.00
E Overhead & Profit 15% x D 14,890.50
F Harga Satuan Pekerjaan (D+E) 114,160.50
A. 4.6.1.HARGA SATUAN PEKERJAAN KAYU
A. 4.6.1.1 Pembuatan dan Pemasangan 1 m3 Kosen Pintu & Jendela Kayu klas I ( Kayu Jati ) 27,824,784.75
A TENAGA
Pekerja L.01 OH 7.000 67,500.00 472,500.00
Tukang Kayu L.02 OH 21.000 81,000.00 1,701,000.00
Kepala Tukang L.03 OH 2.100 85,500.00 179,550.00
Mandor L.04 OH 0.350 90,000.00 31,500.00
JUMLAH TENAGA KERJA 2,384,550.00
B BAHAN
Kayu Klas I (Jati) , Balok m3 1.100 19,800,000.00 21,780,000.00
Paku Biasa 2" - 5 " kg 1.250 13,500.00 16,875.00
Lem Kayu kg 1.000 14,040.00 14,040.00
JUMLAH HARGA BAHAN 21,810,915.00
C PERALATAN
D Jumlah A + B + C 24,195,465.00
E Overhead & Profit 15% x D 3,629,319.75
F Harga Satuan Pekerjaan (D+E) 27,824,784.75
A. 4.6.1.2 Pembuatan dan Pemasangan 1 m3 Kosen Pintu & Jendela Kayu klas II atau III ( Kayu 12,073,637.25
A TENAGA
Pekerja L.01 OH 6.000 67,500.00 405,000.00
Tukang Kayu L.02 OH 18.000 81,000.00 1,458,000.00
Kepala Tukang L.03 OH 1.800 85,500.00 153,900.00
Mandor L.04 OH 0.300 90,000.00 27,000.00
JUMLAH TENAGA KERJA 2,043,900.00
B BAHAN
Kayu Klas II (Kruing) , Balok m3 1.200 7,020,000.00 8,424,000.00
Paku Biasa 2" - 5 " kg 1.250 13,500.00 16,875.00
Lem Kayu kg 1.000 14,040.00 14,040.00
JUMLAH HARGA BAHAN 8,454,915.00
C PERALATAN
D Jumlah A + B + C 10,498,815.00
E Overhead & Profit 15% x D 1,574,822.25
F Harga Satuan Pekerjaan (D+E) 12,073,637.25
A. 4.6.1.3 Pembuatan dan Pemasangan 1 m2 Pintu KlampStandard Kayu Klas II (Kayu Kamfer) 593,339.63
A TENAGA
Pekerja L.01 OH 0.350 67,500.00 23,625.00
Tukang Kayu L.02 OH 1.050 81,000.00 85,050.00
Kepala Tukang L.03 OH 0.105 85,500.00 8,977.50
Mandor L.04 OH 0.018 90,000.00 1,620.00
JUMLAH TENAGA KERJA 119,272.50
B BAHAN
Kayu Klas II (Kamfer), papan m3 0.040 9,900,000.00 396,000.00
Paku Biasa 2" - 5 " Kg 0.050 13,500.00 675.00
JUMLAH HARGA BAHAN 396,675.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah A + B + C 515,947.50
E Overhead & Profit 15% x D 77,392.13
F Harga Satuan Pekerjaan (D+E) 593,339.63
A. 4.6.1.4 Pembuatan dan Pemasangan 1 m2 Daun Pintu Klamp Sederhana Kayu Klas III ( Kayu 593,339.63
A TENAGA
Pekerja L.01 OH 0.350 67,500.00 23,625.00
Tukang Kayu L.02 OH 1.050 81,000.00 85,050.00
Kepala Tukang L.03 OH 0.105 85,500.00 8,977.50
Mandor L.04 OH 0.018 90,000.00 1,620.00
JUMLAH TENAGA KERJA 119,272.50
B BAHAN
Kayu Klas II (Kamfer), papan m3 0.040 9,900,000.00 396,000.00
Paku Biasa 2" - 5 " Kg 0.050 13,500.00 675.00
JUMLAH HARGA BAHAN 396,675.00
C PERALATAN
D Jumlah A + B + C 515,947.50
E Overhead & Profit 15% x D 77,392.13
F Harga Satuan Pekerjaan (D+E) 593,339.63
A. 4.6.1.5 Pembuatan dan Pemasangan 1 m2 Daun Pintu Panel, Kayu Klas I atau II ( Kayu Kamfe 855,220.50
A TENAGA
Pekerja L.01 OH 1.000 67,500.00 67,500.00
Tukang Kayu L.02 OH 3.000 81,000.00 243,000.00
Kepala Tukang L.03 OH 0.300 85,500.00 25,650.00
Mandor L.04 OH 0.050 90,000.00 4,500.00
JUMLAH TENAGA KERJA 340,650.00
B BAHAN
Kayu Klas II (Kamfer), papan m3 0.040 9,900,000.00 396,000.00
Lem Kayu kg 0.500 14,040.00 7,020.00
JUMLAH HARGA BAHAN 403,020.00
C PERALATAN
D Jumlah A + B + C 743,670.00
E Overhead & Profit 15% x D 111,550.50
F Harga Satuan Pekerjaan (D+E) 855,220.50
A. 4.6.1.6 Pembuatan dan Pemasangan 1 m2 Pintu & Jendela Kaca Kayu Klas I atau II ( Kayu Ka 591,481.80
A TENAGA
Pekerja L.01 OH 0.800 67,500.00 54,000.00
Tukang Kayu L.02 OH 2.400 81,000.00 194,400.00
Kepala Tukang L.03 OH 0.240 85,500.00 20,520.00
Mandor L.04 OH 0.040 90,000.00 3,600.00
JUMLAH TENAGA KERJA 272,520.00
B BAHAN
Kayu Klas II (Kamfer), papan m3 0.024 9,900,000.00 237,600.00
Lem Kayu kg 0.300 14,040.00 4,212.00
JUMLAH HARGA BAHAN 241,812.00
C PERALATAN
D Jumlah A + B + C 514,332.00
E Overhead & Profit 15% x D 77,149.80
F Harga Satuan Pekerjaan (D+E) 591,481.80
A. 4.6.1.7 Pembuatan dan Pemasangan 1 m2 Pintu & Jendela Jalusi Kayu Klas I atau II ( Kayu Ja 1,757,740.50
A TENAGA
Pekerja L.01 OH 1.000 67,500.00 67,500.00
Tukang Kayu L.02 OH 3.000 81,000.00 243,000.00
Kepala Tukang L.03 OH 0.300 85,500.00 25,650.00
Mandor L.04 OH 0.050 90,000.00 4,500.00
JUMLAH TENAGA KERJA 340,650.00
B BAHAN
Kayu Klas I (Jati), papan m3 0.064 18,450,000.00 1,180,800.00
Lem Kayu kg 0.500 14,040.00 7,020.00
JUMLAH HARGA BAHAN 1,187,820.00
C PERALATAN
D Jumlah A + B + C 1,528,470.00
E Overhead & Profit 15% x D 229,270.50
F Harga Satuan Pekerjaan (D+E) 1,757,740.50
A. 4.6.1.8 Pembuatan dan Pemasangan 1 m2 Pintu kayu lapis (Plywood) Rangkap rangka Kayu Kla 645,012.00
A TENAGA
Pekerja L.01 OH 0.700 67,500.00 47,250.00
Tukang Kayu L.02 OH 2.100 81,000.00 170,100.00
Kepala Tukang L.03 OH 0.210 85,500.00 17,955.00
Mandor L.04 OH 0.035 90,000.00 3,150.00
JUMLAH TENAGA KERJA 238,455.00
B BAHAN
Kayu Klas II (Kamfer), papan m3 0.025 9,900,000.00 247,500.00
Paku Biasa 1/2" - 1" Kg 0.030 13,500.00 405.00
Lem Kayu Kg 0.500 14,040.00 7,020.00
Plywood tebal 4 mm uk.90x220cm Lbr 1.000 67,500.00 67,500.00
JUMLAH HARGA BAHAN 322,425.00
C PERALATAN
D Jumlah A + B + C 560,880.00
E Overhead & Profit 15% x D 84,132.00
F Harga Satuan Pekerjaan (D+E) 645,012.00
A. 4.6.1.9 Pembuatan dan Pemasangan 1 m2 Pintu Plywood rangkap, rangka expose kayu klas I a 691,017.75
A TENAGA
Pekerja L.01 OH 0.800 67,500.00 54,000.00
Tukang Kayu L.02 OH 2.400 81,000.00 194,400.00
Kepala Tukang L.03 OH 0.240 85,500.00 20,520.00
Mandor L.04 OH 0.040 90,000.00 3,600.00
JUMLAH TENAGA KERJA 272,520.00
B BAHAN
Kayu Klas II (Kamfer), papan m3 0.026 9,900,000.00 253,440.00
Paku Biasa 1/2" - 1" Kg 0.030 13,500.00 405.00
Lem Kayu kg 0.500 14,040.00 7,020.00
Plywood tebal 4 mm uk.90x220cm Lbr 1.000 67,500.00 67,500.00
JUMLAH HARGA BAHAN 328,365.00
C PERALATAN
D Jumlah A + B + C 600,885.00
E Overhead & Profit 15% x D 90,132.75
F Harga Satuan Pekerjaan (D+E) 691,017.75
A. 4.6.1.10 Pembuatan dan Pemasangan 1 m2 Jalusi mati Kosen Kayu Klas I atau II ( Kayu Jati ) 1,568,025.00
A TENAGA
Pekerja L.01 OH 0.670 67,500.00 45,225.00
Tukang Kayu L.02 OH 2.000 81,000.00 162,000.00
Kepala Tukang L.03 OH 0.200 85,500.00 17,100.00
Mandor L.04 OH 0.335 90,000.00 30,150.00
JUMLAH TENAGA KERJA 254,475.00
B BAHAN
Kayu Klas I (Jati), papan m3 0.060 18,450,000.00 1,107,000.00
Paku Biasa 1/2" - 1" Kg 0.150 13,500.00 2,025.00
JUMLAH HARGA BAHAN 1,109,025.00
C PERALATAN
D Jumlah A + B + C 1,363,500.00
E Overhead & Profit 15% x D 204,525.00
F Harga Satuan Pekerjaan (D+E) 1,568,025.00
A. 4.6.1.11 Pembuatan dan Pemasangan 1 m2n Pintu Teakwood Rangkap, Rangka Expose Kayu Klas 926,770.05
A TENAGA
Pekerja L.01 OH 0.800 67,500.00 54,000.00
Tukang Kayu L.02 OH 2.400 81,000.00 194,400.00
Kepala Tukang L.03 OH 0.240 85,500.00 20,520.00
Mandor L.04 OH 0.040 90,000.00 3,600.00
JUMLAH TENAGA KERJA 272,520.00
B BAHAN
Kayu Klas I (Jati), papan m3 0.025 18,450,000.00 461,250.00
Paku Biasa 1/2" - 1" Kg 0.030 13,500.00 405.00
Lem Kayu kg 0.300 14,040.00 4,212.00
Teakwood (90 x 220) cm x 4 mm Lbr 1.000 67,500.00 67,500.00
JUMLAH HARGA BAHAN 533,367.00
C PERALATAN
D Jumlah A + B + C 805,887.00
E Overhead & Profit 15% x D 120,883.05
F Harga Satuan Pekerjaan (D+E) 926,770.05
A. 4.6.1.12 Pembuatan dan Pemasangan 1 m2 Pintu Teakwood Rangkap Lapis Formika,Rangka expo 735,339.56
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.850 67,500.00 57,375.00
Tukang Kayu L.02 OH 2.550 81,000.00 206,550.00
Kepala Tukang L.03 OH 0.255 85,500.00 21,802.50
Mandor L.04 OH 0.043 90,000.00 3,870.00
JUMLAH TENAGA KERJA 289,597.50
B BAHAN
Kayu Klas II (Kamfer), papan m3 0.025 9,900,000.00 247,500.00
Paku Biasa 1/2" - 1" Kg 0.030 13,500.00 405.00
Lem Kayu kg 0.080 14,040.00 1,123.20
Teakwood (90 x 220) cm x 4 mm Lbr 1.000 67,500.00 67,500.00
Formika Lbr 0.5 66,600.00 33,300.00
JUMLAH HARGA BAHAN 349,828.20
C PERALATAN
D Jumlah A + B + C 639,425.70
E Overhead & Profit 15% x D 95,913.86
F Harga Satuan Pekerjaan (D+E) 735,339.56
A. 4.6.1.13 Pembuatan dan Pemasangan 1 m3 Konstruksi Kuda-kuda Konvensional Kayu I; II & III 10,736,055.00
A TENAGA
Pekerja L.01 OH 4.000 67,500.00 270,000.00
Tukang Kayu L.02 OH 12.000 81,000.00 972,000.00
Kepala Tukang L.03 OH 1.200 85,500.00 102,600.00
Mandor L.04 OH 0.200 90,000.00 18,000.00
JUMLAH TENAGA KERJA 1,362,600.00
B BAHAN
Kayu Kruing, balok m3 1.100 7,020,000.00 7,722,000.00
Besi Strip Kg 15.000 11,700.00 175,500.00
Paku Biasa 2" - 5" Kg 5.600 13,500.00 75,600.00
JUMLAH HARGA BAHAN 7,973,100.00
C PERALATAN
D Jumlah A + B + C 9,335,700.00
E Overhead & Profit 15% x D 1,400,355.00
F Harga Satuan Pekerjaan (D+E) 10,736,055.00
A. 4.6.1.14 Pembuatan dan Pemasangan 1 m3 Konstruksi Kuda-kuda Expose, Kayu Klas I ( Kayu Ja 30,237,473.25
A TENAGA
Pekerja L.01 OH 6.700 67,500.00 452,250.00
Tukang Kayu L.02 OH 20.100 81,000.00 1,628,100.00
Kepala Tukang L.03 OH 2.010 85,500.00 171,855.00
Mandor L.04 OH 0.335 90,000.00 30,150.00
JUMLAH TENAGA KERJA 2,282,355.00
B BAHAN
Kayu Klas I (jati), balok m3 1.200 19,800,000.00 23,760,000.00
Besi Strip Kg 15.000 11,700.00 175,500.00
Paku Biasa 2" - 5" Kg 5.600 13,500.00 75,600.00
JUMLAH HARGA BAHAN 24,011,100.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah A + B + C 26,293,455.00
E Overhead & Profit 15% x D 3,944,018.25
F Harga Satuan Pekerjaan (D+E) 30,237,473.25
A TENAGA
Pekerja L.01 OH 6.700 67,500.00 452,250.00
Tukang Kayu L.02 OH 20.100 81,000.00 1,628,100.00
Kepala Tukang L.03 OH 2.010 85,500.00 171,855.00
Mandor L.04 OH 0.335 90,000.00 30,150.00
JUMLAH TENAGA KERJA 2,282,355.00
B BAHAN
Kayu Klas II (Kruing), balok m3 1.100 7,020,000.00 7,722,000.00
Besi Strip Kg 15.000 11,700.00 175,500.00
Paku Biasa 2" - 5" Kg 3.000 13,500.00 40,500.00
JUMLAH HARGA BAHAN 7,938,000.00
C PERALATAN
D Jumlah A + B + C 10,220,355.00
E Overhead & Profit 15% x D 1,533,053.25
F Harga Satuan Pekerjaan (D+E) 11,753,408.25
A. 4.6.1.16 Pemasangan 1 m2 Rangka Atap Genteng Keramik, Kayu Klas II ( Kayu Kruing ) 164,544.30
A TENAGA
Pekerja L.01 OH 0.100 67,500.00 6,750.00
Tukang Kayu L.02 OH 0.100 81,000.00 8,100.00
Kepala Tukang L.03 OH 0.010 85,500.00 855.00
Mandor L.04 OH 0.005 90,000.00 450.00
JUMLAH TENAGA KERJA 16,155.00
B BAHAN
Kayu Klas II (Kruing), Kaso-kaso (5x7) cm m3 0.014 7,020,000.00 98,280.00
Reng (2x3) cm m3 0.0036 7,020,000.00 25,272.00
Paku Biasa 2" - 5" Kg 0.250 13,500.00 3,375.00
JUMLAH HARGA BAHAN 126,927.00
C PERALATAN
D Jumlah A + B + C 143,082.00
E Overhead & Profit 15% x D 21,462.30
F Harga Satuan Pekerjaan (D+E) 164,544.30
A. 4.6.1.17 Pemasangan 1 m2 Rangka Atap Genteng Beton, Kayu Klas II ( Kayu Kruing ) 193,607.10
A TENAGA
Pekerja L.01 OH 0.100 67,500.00 6,750.00
Tukang Kayu L.02 OH 0.100 81,000.00 8,100.00
Kepala Tukang L.03 OH 0.010 85,500.00 855.00
Mandor L.04 OH 0.005 90,000.00 450.00
JUMLAH TENAGA KERJA 16,155.00
B BAHAN
Kayu Klas II (Kruing), Kaso-kaso (5x7) cm m3 0.014 7,020,000.00 98,280.00
Reng (3x4) cm m3 0.0072 7,020,000.00 50,544.00
Paku Biasa 2" - 5" Kg 0.250 13,500.00 3,375.00
JUMLAH HARGA BAHAN 152,199.00
C PERALATAN
D Jumlah A + B + C 168,354.00
E Overhead & Profit 15% x D 25,253.10
F Harga Satuan Pekerjaan (D+E) 193,607.10
A. 4.6.1.18 Pemasangan 1 m2 Rangka Atap Sirap, Kayu Klas II ( Kayu Kruing ) 138,420.90
A TENAGA
Pekerja L.01 OH 0.120 67,500.00 8,100.00
Tukang Kayu L.02 OH 0.120 81,000.00 9,720.00
Kepala Tukang L.03 OH 0.012 85,500.00 1,026.00
Mandor L.04 OH 0.006 90,000.00 540.00
JUMLAH TENAGA KERJA 19,386.00
B BAHAN
Kayu Klas II (Kruing), balok m3 0.014 7,020,000.00 98,280.00
Paku Biasa 2" - 5" Kg 0.2 13,500.00 2,700.00
JUMLAH HARGA BAHAN 100,980.00
C PERALATAN
D Jumlah A + B + C 120,366.00
E Overhead & Profit 15% x D 18,054.90
F Harga Satuan Pekerjaan (D+E) 138,420.90
A. 4.6.1.19 Pemasangan 1 m2 Rangka Langit-langit (50x1,00) m, kayu Klas II atau III ( Kayu Mer 137,882.70
A TENAGA
Pekerja L.01 OH 0.150 67,500.00 10,125.00
Tukang Kayu L.02 OH 0.300 81,000.00 24,300.00
Kepala Tukang L.03 OH 0.030 85,500.00 2,565.00
Mandor L.04 OH 0.075 90,000.00 6,750.00
JUMLAH TENAGA KERJA 43,740.00
B BAHAN
Kayu Klas III (Meranti), balok m3 0.0154 4,770,000.00 73,458.00
Paku Biasa 2" - 5" Kg 0.200 13,500.00 2,700.00
JUMLAH HARGA BAHAN 76,158.00
C PERALATAN
D Jumlah A + B + C 119,898.00
E Overhead & Profit 15% x D 17,984.70
F Harga Satuan Pekerjaan (D+E) 137,882.70
A. 4.6.1.20 Pemasangan 1 m2 Rangka Langit-langit (60x60) cm, kayu Klas II atau III ( Kayu Mera 140,749.65
A TENAGA
Pekerja L.01 OH 0.200 67,500.00 13,500.00
Tukang Kayu L.02 OH 0.300 81,000.00 24,300.00
Kepala Tukang L.03 OH 0.030 85,500.00 2,565.00
Mandor L.04 OH 0.010 90,000.00 900.00
JUMLAH TENAGA KERJA 41,265.00
B BAHAN
Kayu Klas III (Meranti), balok m3 0.0163 4,770,000.00 77,751.00
Paku Biasa 2" - 5" Kg 0.250 13,500.00 3,375.00
JUMLAH HARGA BAHAN 81,126.00
C PERALATAN
D Jumlah A + B + C 122,391.00
E Overhead & Profit 15% x D 18,358.65
F Harga Satuan Pekerjaan (D+E) 140,749.65
A. 4.6.1.21 Pemasangan 1 m' Listplank Uk. (3x20)cm Kayu klas I atau II ( Kayu Jati ) 259,578.00
A TENAGA
Pekerja L.01 OH 0.100 67,500.00 6,750.00
Tukang Kayu L.02 OH 0.200 81,000.00 16,200.00
Kepala Tukang L.03 OH 0.020 85,500.00 1,710.00
Mandor L.04 OH 0.005 90,000.00 450.00
JUMLAH TENAGA KERJA 25,110.00
B BAHAN
Kayu klas I (Jati), papan m3 0.0108 18,450,000.00 199,260.00
Paku Biasa 2" - 5" Kg 0.100 13,500.00 1,350.00
JUMLAH HARGA BAHAN 200,610.00
C PERALATAN
D Jumlah A + B + C 225,720.00
E Overhead & Profit 15% x D 33,858.00
F Harga Satuan Pekerjaan (D+E) 259,578.00
A. 4.6.1.22 Pemasangan 1 m' Listplank Uk. (3x30)cm Kayu klas I atau klas II ( Kayu Kruing ) 177,657.75
A TENAGA
Pekerja L.01 OH 0.100 67,500.00 6,750.00
Tukang Kayu L.02 OH 0.200 81,000.00 16,200.00
Kepala Tukang L.03 OH 0.020 85,500.00 1,710.00
Mandor L.04 OH 0.005 90,000.00 450.00
JUMLAH TENAGA KERJA 25,110.00
B BAHAN
Kayu klas II (Kruing), papan m3 0.011 11,700,000.00 128,700.00
Paku Biasa 2" - 5" Kg 0.050 13,500.00 675.00
JUMLAH HARGA BAHAN 129,375.00
C PERALATAN
D Jumlah A + B + C 154,485.00
E Overhead & Profit 15% x D 23,172.75
F Harga Satuan Pekerjaan (D+E) 177,657.75
A. 4.6.1.23 Pemasangan 1 m2 Rangka Dinding Pemisah (60x120) cm Kayu klas II atau III ( Kayu 287,186.63
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.150 67,500.00 10,125.00
Tukang Kayu L.02 OH 0.450 81,000.00 36,450.00
Kepala Tukang L.03 OH 0.045 85,500.00 3,847.50
Mandor L.04 OH 0.008 90,000.00 720.00
JUMLAH TENAGA KERJA 51,142.50
B BAHAN
Kayu klas II (Kruing), balok m3 0.028 7,020,000.00 196,560.00
Paku Biasa 2" - 5" Kg 0.150 13,500.00 2,025.00
JUMLAH HARGA BAHAN 198,585.00
C PERALATAN
D Jumlah A + B + C 249,727.50
E Overhead & Profit 15% x D 37,459.13
F Harga Satuan Pekerjaan (D+E) 287,186.63
A. 4.6.1.24 Pemasangan 1 m2 Dinding Pemisah Teakwood Rangkap Rangka Kayu Klas II ( Kayu Kr 362,985.89
A TENAGA
Pekerja L.01 OH 0.150 67,500.00 10,125.00
Tukang Kayu L.02 OH 0.450 81,000.00 36,450.00
Kepala Tukang L.03 OH 0.045 85,500.00 3,847.50
Mandor L.04 OH 0.008 90,000.00 720.00
JUMLAH TENAGA KERJA 51,142.50
B BAHAN
Kayu klas II (Kruing), balok m3 0.028 7,020,000.00 196,560.00
Paku Biasa 2" - 5" Kg 0.150 13,500.00 2,025.00
Teakwood 120 x 240 cm tebal 4mm Lbr 0.860 67,500.00 58,050.00
Lem Ltr 0.560 14,040.00 7,862.40
JUMLAH HARGA BAHAN 264,497.40
C PERALATAN
D Jumlah A + B + C 315,639.90
E Overhead & Profit 15% x D 47,345.99
F Harga Satuan Pekerjaan (D+E) 362,985.89
A. 4.6.1.25 Pemasangan 1 m2 Dinding Pemisah Plywood Rangkap Rangka Kayu Klas II ( Kayu Kru 368,549.01
A TENAGA
Pekerja L.01 OH 0.020 67,500.00 1,350.00
Tukang Kayu L.02 OH 0.600 81,000.00 48,600.00
Kepala Tukang L.03 OH 0.060 85,500.00 5,130.00
Mandor L.04 OH 0.010 90,000.00 900.00
JUMLAH TENAGA KERJA 55,980.00
B BAHAN
Kayu klas II (Kruing), balok m3 0.028 7,020,000.00 196,560.00
Paku Biasa 2" - 5" Kg 0.150 13,500.00 2,025.00
Plywood 120 x 240 cm tebal 4mm Lbr 0.860 67,500.00 58,050.00
Lem Ltr 0.560 14,040.00 7,862.40
JUMLAH HARGA BAHAN 264,497.40
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah A + B + C 320,477.40
E Overhead & Profit 15% x D 48,071.61
F Harga Satuan Pekerjaan (D+E) 368,549.01
A. 4.6.1.26 Pemasangan 1 m2 Dinding Lambrisering dari Papan klas I ( Kayu Jati ) 386,908.88
A TENAGA 204,390.00
Pekerja L.01 OH 0.600 67,500.00 40,500.00
Tukang Kayu L.02 OH 1.800 81,000.00 145,800.00
Kepala Tukang L.03 OH 0.180 85,500.00 15,390.00
Mandor L.04 OH 0.030 90,000.00 2,700.00
JUMLAH TENAGA KERJA 204,390.00
B BAHAN
Kayu klas I (Jati), papan m3 0.007 18,450,000.00 129,150.00
Paku Biasa 2" - 5" Kg 0.100 13,500.00 1,350.00
Paku Sekrup 3,5" Kg 0.150 10,350.00 1,552.50
JUMLAH HARGA BAHAN 132,052.50
C PERALATAN
D Jumlah A + B + C 336,442.50
E Overhead & Profit 15% x D 50,466.38
F Harga Satuan Pekerjaan (D+E) 386,908.88
A TENAGA
Pekerja L.01 OH 0.025 67,500.00 1,687.50
Tukang Kayu L.02 OH 0.075 81,000.00 6,075.00
Kepala Tukang L.03 OH 0.0080 85,500.00 684.00
Mandor L.04 OH 0.0010 90,000.00 90.00
JUMLAH TENAGA KERJA 8,536.50
B BAHAN
Plywood (120 X 240) cm x 4mm Lbr 0.400 67,500.00 27,000.00
Paku Biasa 1/2" - 1" Kg 0.050 13,500.00 675.00
JUMLAH HARGA BAHAN 27,675.00
C PERALATAN
D Jumlah A + B + C 36,211.50
E Overhead & Profit 15% x D 5,431.73
F Harga Satuan Pekerjaan (D+E) 41,643.23
A. 4.6.1.28 Pemasangan 1 m2 Dinding Bilik, Rangka Kayu Klas III atau IV ( Kayu Meranti ) 125,366.19
A TENAGA
Pekerja L.01 OH 0.100 67,500.00 6,750.00
Tukang Kayu L.02 OH 0.050 81,000.00 4,050.00
Kepala Tukang L.03 OH 0.005 85,500.00 427.50
Mandor L.04 OH 0.005 90,000.00 450.00
JUMLAH TENAGA KERJA 11,677.50
B BAHAN
Bilik Bambu m2 1.500 20,250.00 30,375.00
Kayu Klas III (Meranti) m3 0.014 4,770,000.00 66,780.00
Paku Biasa 1/2" - 1" Kg 0.012 13,500.00 162.00
List Kayu 2/4 m' 0.003 6,525.00 19.58
JUMLAH HARGA BAHAN 97,336.58
C PERALATAN
D Jumlah A + B + C 109,014.08
E Overhead & Profit 15% x D 16,352.11
F Harga Satuan Pekerjaan (D+E) 125,366.19
A. 4.6.1.2 Pembuatan dan Pemasangan 1 m3 Kosen Pintu & Jendela ( Kayu Kruing ) 12,073,637.25
A TENAGA
Pekerja L.01 OH 6.000 67,500.00 405,000.00
Tukang Kayu L.02 OH 18.000 81,000.00 1,458,000.00
Kepala Tukang L.03 OH 1.800 85,500.00 153,900.00
Mandor L.04 OH 0.300 90,000.00 27,000.00
JUMLAH TENAGA KERJA 2,043,900.00
B BAHAN
Kayu Kruing (Balok) m3 1.200 7,020,000.00 8,424,000.00
Paku Biasa 1/2" - 1" kg 1.250 13,500.00 16,875.00
Lem Kayu kg 1.000 14,040.00 14,040.00
JUMLAH HARGA BAHAN 8,454,915.00
C PERALATAN
D Jumlah A + B + C 10,498,815.00
E Overhead & Profit 15% x D 1,574,822.25
F Harga Satuan Pekerjaan (D+E) 12,073,637.25
A TENAGA
Pekerja L.01 OH 0.100 67,500.00 6,750.00
Tukang Kayu L.02 OH 0.200 81,000.00 16,200.00
Kepala Tukang L.03 OH 0.020 85,500.00 1,710.00
Mandor L.04 OH 0.005 90,000.00 450.00
JUMLAH TENAGA KERJA 25,110.00
B BAHAN
woodplank m' 1.0000 15,750.00 15,750.00
Paku Biasa 2" - 5" Kg 0.100 13,500.00 1,350.00
JUMLAH HARGA BAHAN 17,100.00
C PERALATAN
D Jumlah A + B + C 42,210.00
E Overhead & Profit 15% x D 6,331.50
F Harga Satuan Pekerjaan (D+E) 48,541.50
A TENAGA
Pekerja L.01 OH 0.800 67,500.00 54,000.00
Tukang Kayu L.02 OH 2.400 81,000.00 194,400.00
Kepala Tukang L.03 OH 0.240 85,500.00 20,520.00
Mandor L.04 OH 0.040 90,000.00 3,600.00
JUMLAH TENAGA KERJA 272,520.00
B BAHAN
Kayu Klas II (meranti), balok m3 0.028 4,770,000.00 133,560.00
Paku Biasa 1/2" - 1" Kg 0.150 13,500.00 2,025.00
Lem Kayu kg 0.560 14,040.00 7,862.40
Multiplek tebal 6 mm uk.120x220cm Lbr 0.430 81,000.00 34,830.00
HPL Lbr 0.500 171,000.00 85,500.00
Lem Kuning Kg 0.350 34,200.00 11,970.00
Assesories ( list stainlees, kabel, stop kontak ) Ls 1.000 100,000.00 100,000.00
JUMLAH HARGA BAHAN 375,747.40
C PERALATAN
D Jumlah A + B + C 648,267.40
E Overhead & Profit 15% x D 97,240.11
F Harga Satuan Pekerjaan (D+E) 745,507.51
A. 4.6.2.HARGA SATUAN PEKERJAAN KUNCI DAN KACA
A. 4.6.2.2 Pemasangan 1 buah Kunci Tanam Biasa 210,105.00
A TENAGA
Pekerja L.01 OH 0.010 67,500.00 675.00
Tukang Kayu L.02 OH 0.500 81,000.00 40,500.00
Kepala Tukang L.03 OH 0.050 85,500.00 4,275.00
Mandor L.04 OH 0.005 90,000.00 450.00
JUMLAH TENAGA KERJA 45,900.00
B BAHAN
Kunci Tanam Biasa Buah 1.000 136,800.00 136,800.00
JUMLAH HARGA BAHAN 136,800.00
C PERALATAN
D Jumlah A + B + C 182,700.00
E Overhead & Profit 15% x D 27,405.00
F Harga Satuan Pekerjaan (D+E) 210,105.00
A TENAGA
Pekerja L.01 OH 0.005 67,500.00 337.50
Tukang Kayu L.02 OH 0.500 81,000.00 40,500.00
Kepala Tukang L.03 OH 0.005 85,500.00 427.50
Mandor L.04 OH 0.0025 90,000.00 225.00
JUMLAH TENAGA KERJA 41,490.00
B BAHAN
Kunci Tanam Kamar Mandi Buah 1.000 76,500.00 76,500.00
JUMLAH HARGA BAHAN 76,500.00
C PERALATAN
D Jumlah A + B + C 117,990.00
E Overhead & Profit 15% x D 17,698.50
F Harga Satuan Pekerjaan (D+E) 135,688.50
A TENAGA
Pekerja L.01 OH 0.005 67,500.00 337.50
Tukang Kayu L.02 OH 0.500 81,000.00 40,500.00
Kepala Tukang L.03 OH 0.005 85,500.00 427.50
Mandor L.04 OH 0.0025 90,000.00 225.00
JUMLAH TENAGA KERJA 41,490.00
B BAHAN
Kunci Selinder Buah 1.000 136,800.00 136,800.00
JUMLAH HARGA BAHAN 136,800.00
C PERALATAN
D Jumlah A + B + C 178,290.00
E Overhead & Profit 15% x D 26,743.50
F Harga Satuan Pekerjaan (D+E) 205,033.50
A TENAGA
Pekerja L.01 OH 0.015 67,500.00 1,012.50
Tukang Kayu L.02 OH 0.150 81,000.00 12,150.00
Kepala Tukang L.03 OH 0.015 85,500.00 1,282.50
Mandor L.04 OH 0.0008 90,000.00 67.50
JUMLAH TENAGA KERJA 14,512.50
B BAHAN
Engsel pintu Buah 1.000 12,870.00 12,870.00
JUMLAH HARGA BAHAN 12,870.00
C PERALATAN
D Jumlah A + B + C 27,382.50
E Overhead & Profit 15% x D 4,107.38
F Harga Satuan Pekerjaan (D+E) 31,489.88
A TENAGA
Pekerja L.01 OH 0.010 67,500.00 675.00
Tukang Kayu L.02 OH 0.100 81,000.00 8,100.00
Kepala Tukang L.03 OH 0.010 85,500.00 855.00
Mandor L.04 OH 0.005 90,000.00 450.00
JUMLAH TENAGA KERJA 10,080.00
B BAHAN
Engsel Jendela Buah 1 16,650.00 16,650.00
JUMLAH HARGA BAHAN 16,650.00
C PERALATAN
D Jumlah A + B + C 26,730.00
E Overhead & Profit 15% x D 4,009.50
F Harga Satuan Pekerjaan (D+E) 30,739.50
A TENAGA
Pekerja L.01 OH 0.100 67,500.00 6,750.00
Tukang Kayu L.02 OH 0.200 81,000.00 16,200.00
Kepala Tukang L.03 OH 0.020 85,500.00 1,710.00
Mandor L.04 OH 0.0005 90,000.00 45.00
JUMLAH TENAGA KERJA 24,705.00
B BAHAN
Engsel Angin Buah 1.000 23,400.00 23,400.00
JUMLAH HARGA BAHAN 23,400.00
C PERALATAN
D Jumlah A + B + C 48,105.00
E Overhead & Profit 15% x D 7,215.75
F Harga Satuan Pekerjaan (D+E) 55,320.75
A TENAGA
Pekerja L.01 OH 0.015 67,500.00 1,012.50
Tukang Kayu L.02 OH 0.150 81,000.00 12,150.00
Kepala Tukang L.03 OH 0.015 85,500.00 1,282.50
Mandor L.04 OH 0.008 90,000.00 720.00
JUMLAH TENAGA KERJA 15,165.00
B BAHAN
Kait Angin Buah 1.000 32,850.00 32,850.00
JUMLAH HARGA BAHAN 32,850.00
C PERALATAN
D Jumlah A + B + C 48,015.00
E Overhead & Profit 15% x D 7,202.25
F Harga Satuan Pekerjaan (D+E) 55,217.25
A TENAGA
Pekerja L.01 OH 0.050 67,500.00 3,375.00
Tukang Kayu L.02 OH 0.500 81,000.00 40,500.00
Kepala Tukang L.03 OH 0.050 85,500.00 4,275.00
Mandor L.04 OH 0.0025 90,000.00 225.00
JUMLAH TENAGA KERJA 48,375.00
B BAHAN
Door Closer Buah 1.000 256,500.00 256,500.00
JUMLAH HARGA BAHAN 256,500.00
C PERALATAN
D Jumlah A + B + C 304,875.00
E Overhead & Profit 15% x D 45,731.25
F Harga Satuan Pekerjaan (D+E) 350,606.25
A TENAGA
Pekerja L.01 OH 0.020 67,500.00 1,350.00
Tukang Kayu L.02 OH 0.200 81,000.00 16,200.00
Kepala Tukang L.03 OH 0.020 85,500.00 1,710.00
Mandor L.04 OH 0.001 90,000.00 90.00
JUMLAH TENAGA KERJA 19,350.00
B BAHAN
Kunci Selot Buah 1.000 9,000.00 9,000.00
JUMLAH HARGA BAHAN 9,000.00
C PERALATAN
D Jumlah A + B + C 28,350.00
E Overhead & Profit 15% x D 4,252.50
F Harga Satuan Pekerjaan (D+E) 32,602.50
A TENAGA
Pekerja L.01 OH 0.010 67,500.00 675.00
Tukang Kayu L.02 OH 0.100 81,000.00 8,100.00
Kepala Tukang L.03 OH 0.010 85,500.00 855.00
Mandor L.04 OH 0.0005 90,000.00 45.00
JUMLAH TENAGA KERJA 9,675.00
B BAHAN
Door Stop Buah 1.000 40,500.00 40,500.00
JUMLAH HARGA BAHAN 40,500.00
C PERALATAN
D Jumlah A + B + C 50,175.00
E Overhead & Profit 15% x D 7,526.25
F Harga Satuan Pekerjaan (D+E) 57,701.25
A TENAGA
Pekerja L.01 OH 0.060 67,500.00 4,050.00
Tukang Kayu L.02 OH 0.600 81,000.00 48,600.00
Kepala Tukang L.03 OH 0.060 85,500.00 5,130.00
Mandor L.04 OH 0.003 90,000.00 270.00
JUMLAH TENAGA KERJA 58,050.00
B BAHAN
Rel Pintu Dorong Buah 1.000 193,500.00 193,500.00
JUMLAH HARGA BAHAN 193,500.00
C PERALATAN
D Jumlah A + B + C 251,550.00
E Overhead & Profit 15% x D 37,732.50
F Harga Satuan Pekerjaan (D+E) 289,282.50
A TENAGA
Pekerja L.01 OH 0.025 67,500.00 1,687.50
Tukang Kayu L.02 OH 0.250 81,000.00 20,250.00
Kepala Tukang L.03 OH 0.025 85,500.00 2,137.50
Mandor L.04 OH 0.0013 90,000.00 117.00
JUMLAH TENAGA KERJA 24,192.00
B BAHAN
Kunci Lemari Buah 1.000 6,750.00 6,750.00
JUMLAH HARGA BAHAN 6,750.00
C PERALATAN
D Jumlah A + B + C 30,942.00
E Overhead & Profit 15% x D 4,641.30
F Harga Satuan Pekerjaan (D+E) 35,583.30
A TENAGA
Pekerja L.01 OH 0.015 67,500.00 1,012.50
Tukang Kayu L.02 OH 0.150 81,000.00 12,150.00
Kepala Tukang L.03 OH 0.015 85,500.00 1,282.50
Mandor L.04 OH 0.0008 90,000.00 67.50
JUMLAH TENAGA KERJA 14,512.50
B BAHAN
Kaca tebal 3mm m2 1.100 74,250.00 81,675.00
JUMLAH HARGA BAHAN 81,675.00
C PERALATAN
D Jumlah A + B + C 96,187.50
E Overhead & Profit 15% x D 14,428.13
F Harga Satuan Pekerjaan (D+E) 110,615.63
A TENAGA
Pekerja L.01 OH 0.015 67,500.00 1,012.50
Tukang Kayu L.02 OH 0.150 81,000.00 12,150.00
Kepala Tukang L.03 OH 0.015 85,500.00 1,282.50
Mandor L.04 OH 0.0008 90,000.00 67.50
JUMLAH TENAGA KERJA 14,512.50
B BAHAN
Kaca tebal 5mm m2 1.100 112,500.00 123,750.00
JUMLAH HARGA BAHAN 123,750.00
C PERALATAN
D Jumlah A + B + C 138,262.50
E Overhead & Profit 15% x D 20,739.38
F Harga Satuan Pekerjaan (D+E) 159,001.88
A TENAGA
Pekerja L.01 OH 0.017 67,500.00 1,147.50
Tukang Kayu L.02 OH 0.170 81,000.00 13,770.00
Kepala Tukang L.03 OH 0.017 85,500.00 1,453.50
Mandor L.04 OH 0.0009 90,000.00 76.50
JUMLAH TENAGA KERJA 16,447.50
B BAHAN
Kaca Cermin m2 1.100 211,500.00 232,650.00
JUMLAH HARGA BAHAN 232,650.00
C PERALATAN
D Jumlah A + B + C 249,097.50
E Overhead & Profit 15% x D 37,364.63
F Harga Satuan Pekerjaan (D+E) 286,462.13
A TENAGA
Pekerja L.01 OH 0.010 67,500.00 675.00
Tukang Kayu L.02 OH 0.500 81,000.00 40,500.00
Kepala Tukang L.03 OH 0.010 85,500.00 855.00
Mandor L.04 OH 0.0050 90,000.00 450.00
JUMLAH TENAGA KERJA 42,480.00
B BAHAN
Lockset Swing Door Bh 1.000 198,000.00 198,000.00
JUMLAH HARGA BAHAN 198,000.00
C PERALATAN
D Jumlah A + B + C 240,480.00
E Overhead & Profit 15% x D 36,072.00
F Harga Satuan Pekerjaan (D+E) 276,552.00
A TENAGA
Pekerja L.01 OH 0.015 67,500.00 1,012.50
Tukang Kayu L.02 OH 0.150 81,000.00 12,150.00
Kepala Tukang L.03 OH 0.015 85,500.00 1,282.50
Mandor L.04 OH 0.0008 90,000.00 67.50
JUMLAH TENAGA KERJA 14,512.50
B BAHAN
Rambuncis Bh 1.000 36,000.00 36,000.00
JUMLAH HARGA BAHAN 36,000.00
C PERALATAN
D Jumlah A + B + C 50,512.50
E Overhead & Profit 15% x D 7,576.88
F Harga Satuan Pekerjaan (D+E) 58,089.38
A TENAGA
Pekerja L.01 OH 0.015 67,500.00 1,012.50
Tukang Kayu L.02 OH 0.150 81,000.00 12,150.00
Kepala Tukang L.03 OH 0.015 85,500.00 1,282.50
Mandor L.04 OH 0.0008 90,000.00 67.50
JUMLAH TENAGA KERJA 14,512.50
B BAHAN
Flush Bolt Bh 1.000 126,000.00 126,000.00
JUMLAH HARGA BAHAN 126,000.00
C PERALATAN
D Jumlah A + B + C 140,512.50
E Overhead & Profit 15% x D 21,076.88
F Harga Satuan Pekerjaan (D+E) 161,589.38
A TENAGA
Pekerja L.01 OH 0.015 67,500.00 1,012.50
Tukang Kayu L.02 OH 0.150 81,000.00 12,150.00
Kepala Tukang L.03 OH 0.015 85,500.00 1,282.50
Mandor L.04 OH 0.0008 90,000.00 67.50
JUMLAH TENAGA KERJA 14,512.50
B BAHAN
Engsel Casement Bh 1.000 40,500.00 40,500.00
JUMLAH HARGA BAHAN 40,500.00
C PERALATAN
D Jumlah A + B + C 55,012.50
E Overhead & Profit 15% x D 8,251.88
F Harga Satuan Pekerjaan (D+E) 63,264.38
A TENAGA
Pekerja L.01 OH 0.020 67,500.00 1,350.00
Tukang Kayu L.02 OH 0.200 81,000.00 16,200.00
Kepala Tukang L.03 OH 0.020 85,500.00 1,710.00
Mandor L.04 OH 0.0100 90,000.00 900.00
JUMLAH TENAGA KERJA 20,160.00
B BAHAN
Lever Handle pintu aluminium Bh 1.000 49,500.00 49,500.00
JUMLAH HARGA BAHAN 49,500.00
C PERALATAN
D Jumlah A + B + C 69,660.00
E Overhead & Profit 15% x D 10,449.00
F Harga Satuan Pekerjaan (D+E) 80,109.00
A TENAGA
Pekerja L.01 OH 0.050 67,500.00 3,375.00
Tukang Kayu L.02 OH 0.500 81,000.00 40,500.00
Kepala Tukang L.03 OH 0.050 85,500.00 4,275.00
Mandor L.04 OH 0.0025 90,000.00 225.00
JUMLAH TENAGA KERJA 48,375.00
B BAHAN
Floor Hinges Set 1.000 1,980,000.00 1,980,000.00
JUMLAH HARGA BAHAN 1,980,000.00
C PERALATAN
D Jumlah A + B + C 2,028,375.00
E Overhead & Profit 15% x D 304,256.25
F Harga Satuan Pekerjaan (D+E) 2,332,631.25
A TENAGA
Pekerja L.01 OH 0.020 67,500.00 1,350.00
Tukang Kayu L.02 OH 0.200 81,000.00 16,200.00
Kepala Tukang L.03 OH 0.020 85,500.00 1,710.00
Mandor L.04 OH 0.0010 90,000.00 90.00
JUMLAH TENAGA KERJA 19,350.00
B BAHAN
Top Patch Fitting Set 1.000 450,000.00 450,000.00
JUMLAH HARGA BAHAN 450,000.00
C PERALATAN
D Jumlah A + B + C 469,350.00
E Overhead & Profit 15% x D 70,402.50
F Harga Satuan Pekerjaan (D+E) 539,752.50
A TENAGA
Pekerja L.01 OH 0.020 67,500.00 1,350.00
Tukang Kayu L.02 OH 0.200 81,000.00 16,200.00
Kepala Tukang L.03 OH 0.020 85,500.00 1,710.00
Mandor L.04 OH 0.0010 90,000.00 90.00
JUMLAH TENAGA KERJA 19,350.00
B BAHAN
Bottom Patch Fitting Set 1.000 450,000.00 450,000.00
JUMLAH HARGA BAHAN 450,000.00
C PERALATAN
D Jumlah A + B + C 469,350.00
E Overhead & Profit 15% x D 70,402.50
F Harga Satuan Pekerjaan (D+E) 539,752.50
A TENAGA
Pekerja L.01 OH 0.020 67,500.00 1,350.00
Tukang Kayu L.02 OH 0.200 81,000.00 16,200.00
Kepala Tukang L.03 OH 0.020 85,500.00 1,710.00
Mandor L.04 OH 0.0010 90,000.00 90.00
JUMLAH TENAGA KERJA 19,350.00
B BAHAN
Bottom /Top Lock Fitting Set 1.000 1,350,000.00 1,350,000.00
JUMLAH HARGA BAHAN 1,350,000.00
C PERALATAN
D Jumlah A + B + C 1,369,350.00
E Overhead & Profit 15% x D 205,402.50
F Harga Satuan Pekerjaan (D+E) 1,574,752.50
A TENAGA
Pekerja L.01 OH 0.020 67,500.00 1,350.00
Tukang Kayu L.02 OH 0.200 81,000.00 16,200.00
Kepala Tukang L.03 OH 0.020 85,500.00 1,710.00
Mandor L.04 OH 0.0010 90,000.00 90.00
JUMLAH TENAGA KERJA 19,350.00
B BAHAN
Handle Pintu Frameless Set 1.000 720,000.00 720,000.00
JUMLAH HARGA BAHAN 720,000.00
C PERALATAN
D Jumlah A + B + C 739,350.00
E Overhead & Profit 15% x D 110,902.50
F Harga Satuan Pekerjaan (D+E) 850,252.50
A TENAGA
Pekerja L.01 OH 0.020 67,500.00 1,350.00
Tukang Kayu L.02 OH 0.200 81,000.00 16,200.00
Kepala Tukang L.03 OH 0.020 85,500.00 1,710.00
Mandor L.04 OH 0.0010 90,000.00 90.00
JUMLAH TENAGA KERJA 19,350.00
B BAHAN
Fixed Top Pin Set 1.000 180,000.00 180,000.00
JUMLAH HARGA BAHAN 180,000.00
C PERALATAN
D Jumlah A + B + C 199,350.00
E Overhead & Profit 15% x D 29,902.50
F Harga Satuan Pekerjaan (D+E) 229,252.50
A TENAGA
Pekerja L.01 OH 0.020 67,500.00 1,350.00
Tukang Kayu L.02 OH 0.200 81,000.00 16,200.00
Kepala Tukang L.03 OH 0.020 85,500.00 1,710.00
Mandor L.04 OH 0.0010 90,000.00 90.00
JUMLAH TENAGA KERJA 19,350.00
B BAHAN
Over panel pivot patch fitting Set 1.000 810,000.00 810,000.00
JUMLAH HARGA BAHAN 810,000.00
C PERALATAN
D Jumlah A + B + C 829,350.00
E Overhead & Profit 15% x D 124,402.50
F Harga Satuan Pekerjaan (D+E) 953,752.50
A TENAGA
Pekerja L.01 OH 0.020 67,500.00 1,350.00
Tukang Kayu L.02 OH 0.200 81,000.00 16,200.00
Kepala Tukang L.03 OH 0.020 85,500.00 1,710.00
Mandor L.04 OH 0.0010 90,000.00 90.00
JUMLAH TENAGA KERJA 19,350.00
B BAHAN
Over panel Set 1.000 1,170,000.00 1,170,000.00
JUMLAH HARGA BAHAN 1,170,000.00
C PERALATAN
D Jumlah A + B + C 1,189,350.00
E Overhead & Profit 15% x D 178,402.50
F Harga Satuan Pekerjaan (D+E) 1,367,752.50
A TENAGA
Pekerja L.01 OH 0.015 67,500.00 1,012.50
Tukang Kayu L.02 OH 0.150 81,000.00 12,150.00
Kepala Tukang L.03 OH 0.015 85,500.00 1,282.50
Mandor L.04 OH 0.0008 90,000.00 67.50
JUMLAH TENAGA KERJA 14,512.50
B BAHAN
Kaca ryben 5 mm m2 1.100 90,000.00 99,000.00
JUMLAH HARGA BAHAN 99,000.00
C PERALATAN
D Jumlah A + B + C 113,512.50
E Overhead & Profit 15% x D 17,026.88
F Harga Satuan Pekerjaan (D+E) 130,539.38
A TENAGA
Pekerja L.01 OH 0.017 67,500.00 1,147.50
Tukang Kayu L.02 OH 0.170 81,000.00 13,770.00
Kepala Tukang L.03 OH 0.017 85,500.00 1,453.50
Mandor L.04 OH 0.0009 90,000.00 76.50
JUMLAH TENAGA KERJA 16,447.50
B BAHAN
Kaca Tempered 12 mm m2 1.100 585,000.00 643,500.00
JUMLAH HARGA BAHAN 643,500.00
C PERALATAN
D Jumlah A + B + C 659,947.50
E Overhead & Profit 15% x D 98,992.13
F Harga Satuan Pekerjaan (D+E) 758,939.63
A TENAGA
Pekerja L.01 OH 0.015 67,500.00 1,012.50
Tukang Kayu L.02 OH 0.150 81,000.00 12,150.00
Kepala Tukang L.03 OH 0.015 85,500.00 1,282.50
Mandor L.04 OH 0.0008 90,000.00 67.50
JUMLAH TENAGA KERJA 14,512.50
B BAHAN
Kaca Es/Dop m2 1.100 135,000.00 148,500.00
JUMLAH HARGA BAHAN 148,500.00
C PERALATAN
D Jumlah A + B + C 163,012.50
E Overhead & Profit 15% x D 24,451.88
F Harga Satuan Pekerjaan (D+E) 187,464.38
A. 4.7.1.HARGA SATUAN PEKERJAAN PENGECATAN
A. 4.7.1.1 Pengikisan / pengerokan 1 m2 Permukaan Cat Tembok Lama 12,885.75
A TENAGA
Pekerja L.01 OH 0.150 67,500.00 10,125.00
Mandor L.04 OH 0.003 90,000.00 270.00
JUMLAH TENAGA KERJA 10,395.00
B BAHAN
Soda Api Kg 0.050 16,200.00 810.00
JUMLAH HARGA BAHAN 810.00
C PERALATAN
D Jumlah A + B + C 11,205.00
E Overhead & Profit 15% x D 1,680.75
F Harga Satuan Pekerjaan (D+E) 12,885.75
A TENAGA
Pekerja L.01 OH 0.150 67,500.00 10,125.00
Mandor L.04 OH 0.003 90,000.00 270.00
JUMLAH TENAGA KERJA 10,395.00
B BAHAN
Sabun Kg 0.050 9,000.00 450.00
JUMLAH HARGA BAHAN 450.00
C PERALATAN
D Jumlah A + B + C 10,845.00
E Overhead & Profit 15% x D 1,626.75
F Harga Satuan Pekerjaan (D+E) 12,471.75
A. 4.7.1.3 Pengerokan 1 m2 Karat Cat Lama permukaan Baja dengan cara manual 12,989.25
A TENAGA
Pekerja L.01 OH 0.150 67,500.00 10,125.00
Mandor L.04 OH 0.008 90,000.00 720.00
JUMLAH TENAGA KERJA 10,845.00
B BAHAN
Sabun Kg 0.050 9,000.00 450.00
JUMLAH HARGA BAHAN 450.00
C PERALATAN
D Jumlah A + B + C 11,295.00
E Overhead & Profit 15% x D 1,694.25
F Harga Satuan Pekerjaan (D+E) 12,989.25
A. 4.7.1.4 Pengecatan 1 m2 Bidang Kayu Baru (1 lapisp Plamur, 1 lapis Cat dasar, 2 Lapis Cat P 46,882.91
D Jumlah A + B + C 40,767.75
E Overhead & Profit 15% x D 6,115.16
F Harga Satuan Pekerjaan (D+E) 46,882.91
A. 4.7.1.5 Pengecatan 1 m2 Bidang Kayu Baru (1 lapis Plamuur, 1 lapis Cat dasar, 3 Lapis Cat P 61,310.81
A TENAGA
Pekerja L.01 OH 0.070 67,500.00 4,725.00
Tukang Cat L.02 OH 0.105 81,000.00 8,505.00
Kepala Tukang L.03 OH 0.004 85,500.00 342.00
Mandor L.04 OH 0.003 90,000.00 270.00
JUMLAH TENAGA KERJA 13,842.00
B BAHAN
Cat Menie kg 0.200 19,800.00 3,960.00
Plamuur kg 0.150 24,525.00 3,678.75
Cat Dasar kg 0.170 67,500.00 11,475.00
Cat Penutup kg 0.350 54,900.00 19,215.00
Kuas bh 0.010 6,300.00 63.00
Pengencer kg 0.030 18,000.00 540.00
Amplas lbr 0.200 2,700.00 540.00
JUMLAH HARGA BAHAN 39,471.75
C PERALATAN
D Jumlah A + B + C 53,313.75
E Overhead & Profit 15% x D 7,997.06
F Harga Satuan Pekerjaan (D+E) 61,310.81
A TENAGA
Pekerja L.01 OH 0.040 67,500.00 2,700.00
Tukang Cat L.02 OH 0.063 81,000.00 5,103.00
Kepala Tukang L.03 OH 0.063 85,500.00 5,386.50
Mandor L.04 OH 0.003 90,000.00 270.00
JUMLAH TENAGA KERJA 13,459.50
B BAHAN
Teak Oil Ltr 0.360 40,500.00 14,580.00
JUMLAH HARGA BAHAN 14,580.00
C PERALATAN
D Jumlah A + B + C 28,039.50
E Overhead & Profit 15% x D 4,205.93
F Harga Satuan Pekerjaan (D+E) 32,245.43
A TENAGA
Pekerja L.01 OH 0.040 67,500.00 2,700.00
Tukang Cat L.02 OH 0.060 81,000.00 4,860.00
Kepala Tukang L.03 OH 0.016 85,500.00 1,368.00
Mandor L.04 OH 0.003 90,000.00 270.00
JUMLAH TENAGA KERJA 9,198.00
B BAHAN
Politur Ltr 0.150 56,250.00 8,437.50
Politur Jadi Ltr 0.372 56,250.00 20,925.00
Ampelas Lbr 2.000 2,700.00 5,400.00
JUMLAH HARGA BAHAN 34,762.50
C PERALATAN
D Jumlah A + B + C 43,960.50
E Overhead & Profit 15% x D 6,594.08
F Harga Satuan Pekerjaan (D+E) 50,554.58
A. 4.7.1.8 Pelaburan 1 m2 Bidang Kayu dengan Cat Residu dan Ter 14,541.75
A TENAGA
Pekerja L.01 OH 0.100 67,500.00 6,750.00
Mandor L.04 OH 0.006 90,000.00 540.00
JUMLAH TENAGA KERJA 7,290.00
B BAHAN
Residu atau Ter Ltr 0.350 15,300.00 5,355.00
JUMLAH HARGA BAHAN 5,355.00
C PERALATAN
D Jumlah A + B + C 12,645.00
E Overhead & Profit 15% x D 1,896.75
F Harga Satuan Pekerjaan (D+E) 14,541.75
A TENAGA
Pekerja L.01 OH 0.160 67,500.00 10,800.00
Tukang Kayu L.02 OH 0.160 81,000.00 12,960.00
Kepala Tukang L.03 OH 0.016 85,500.00 1,368.00
Mandor L.04 OH 0.003 90,000.00 270.00
JUMLAH TENAGA KERJA 25,398.00
B BAHAN
Vernis Ltr 0.150 40,950.00 6,142.50
Dempul Ltr 0.050 24,525.00 1,226.25
Ampelas Lbr 0.100 2,700.00 270.00
JUMLAH HARGA BAHAN 7,638.75
C PERALATAN
D Jumlah A + B + C 33,036.75
E Overhead & Profit 15% x D 4,955.51
F Harga Satuan Pekerjaan (D+E) 37,992.26
A. 4.7.1.10 Pengecatan 1 m2 Tembok Baru (1 lapis Plamir, 1 lapis Cat Dasar, 2 Lapis Cat Penutup 24,621.10
A TENAGA
Pekerja L.01 OH 0.020 67,500.00 1,350.00
Tukang Kayu L.02 OH 0.063 81,000.00 5,103.00
Kepala Tukang L.03 OH 0.006 85,500.00 538.65
Mandor L.04 OH 0.003 90,000.00 270.00
JUMLAH TENAGA KERJA 7,261.65
B BAHAN
Plamir Kg 0.100 22,500.00 2,250.00
Cat Dasar Kg 0.100 67,500.00 6,750.00
Cat Penutup 2 kali Kg 0.260 19,800.00 5,148.00
JUMLAH HARGA BAHAN 14,148.00
C PERALATAN
D Jumlah A + B + C 21,409.65
E Overhead & Profit 15% x D 3,211.45
F Harga Satuan Pekerjaan (D+E) 24,621.10
A. 4.7.1.10.a Pengecatan 1 m2 Tembok Baru (1 lapis Plamir, 1 lapis Cat Dasar, 2 Lapis Cat Penutup 48,301.90
A TENAGA
Pekerja L.01 OH 0.020 67,500.00 1,350.00
Tukang Kayu L.02 OH 0.063 81,000.00 5,103.00
Kepala Tukang L.03 OH 0.006 85,500.00 538.65
Mandor L.04 OH 0.003 90,000.00 270.00
JUMLAH TENAGA KERJA 7,261.65
B BAHAN
Plamir Kg 0.100 22,500.00 2,250.00
Cat Dasar Kg 0.100 67,500.00 6,750.00
Cat Penutup 2 kali Kg 0.260 99,000.00 25,740.00
JUMLAH HARGA BAHAN 34,740.00
C PERALATAN
D Jumlah A + B + C 42,001.65
E Overhead & Profit 15% x D 6,300.25
F Harga Satuan Pekerjaan (D+E) 48,301.90
A. 4.7.1.11 Pengecatan 1 m2 Tembok Lama (1 lapis Plamir, 2 lapis Cat Penutup) Interior 20,222.87
A TENAGA
Pekerja L.01 OH 0.028 67,500.00 1,890.00
Tukang Kayu L.02 OH 0.042 81,000.00 3,402.00
Kepala Tukang L.03 OH 0.004 85,500.00 359.10
Mandor L.04 OH 0.003 90,000.00 270.00
JUMLAH TENAGA KERJA 5,921.10
B BAHAN
Cat Dasar Kg 0.120 67,500.00 8,100.00
Cat Penutup 2 kali Kg 0.180 19,800.00 3,564.00
JUMLAH HARGA BAHAN 11,664.00
C PERALATAN
D Jumlah A + B + C 17,585.10
E Overhead & Profit 15% x D 2,637.77
F Harga Satuan Pekerjaan (D+E) 20,222.87
A. 4.7.1.11.a Pengecatan 1 m2 Tembok Lama (1 lapis Plamir, 2 lapis Cat Penutup) Exterior 36,617.27
A TENAGA
Pekerja L.01 OH 0.028 67,500.00 1,890.00
Tukang Kayu L.02 OH 0.042 81,000.00 3,402.00
Kepala Tukang L.03 OH 0.004 85,500.00 359.10
Mandor L.04 OH 0.003 90,000.00 270.00
JUMLAH TENAGA KERJA 5,921.10
B BAHAN
Cat Dasar Kg 0.120 67,500.00 8,100.00
Cat Penutup 2 kali Kg 0.180 99,000.00 17,820.00
JUMLAH HARGA BAHAN 25,920.00
C PERALATAN
D Jumlah A + B + C 31,841.10
E Overhead & Profit 15% x D 4,776.17
F Harga Satuan Pekerjaan (D+E) 36,617.27
A TENAGA
Pekerja L.01 OH 0.028 67,500.00 1,890.00
Tukang Kayu L.02 OH 0.042 81,000.00 3,402.00
Kepala Tukang L.03 OH 0.004 85,500.00 359.10
Mandor L.04 OH 0.003 90,000.00 270.00
JUMLAH TENAGA KERJA 5,921.10
B BAHAN
Kalkarium Kg 0.100 4,050.00 405.00
JUMLAH HARGA BAHAN 405.00
C PERALATAN
D Jumlah A + B + C 6,326.10
E Overhead & Profit 15% x D 948.92
F Harga Satuan Pekerjaan (D+E) 7,275.02
A TENAGA
Pekerja L.01 OH 0.150 67,500.00 10,125.00
Tukang Kayu L.02 OH 0.001 81,000.00 81.00
Kepala Tukang L.03 OH 0.000 85,500.00 8.55
Mandor L.04 OH 0.003 90,000.00 225.00
JUMLAH TENAGA KERJA 10,439.55
B BAHAN
Kapur Sirih Kg 0.150 4,230.00 634.50
Amplas lbr 0.100 2,700.00 270.00
Alang-alang ikat 0.250 2,000.00 500.00
JUMLAH HARGA BAHAN 1,404.50
C PERALATAN
D Jumlah A + B + C 11,844.05
E Overhead & Profit 15% x D 1,776.61
F Harga Satuan Pekerjaan (D+E) 13,620.66
A TENAGA
Pekerja L.01 OH 0.040 67,500.00 2,700.00
Tukang Kayu L.02 OH 0.005 81,000.00 405.00
Kepala Tukang L.03 OH 0.001 85,500.00 42.75
Mandor L.04 OH 0.003 90,000.00 225.00
JUMLAH TENAGA KERJA 3,372.75
B BAHAN
Kapur Sirih Kg 0.300 4,230.00 1,269.00
Amplas lbr 0.200 2,700.00 540.00
Alang-alang ikat 0.250 2,000.00 500.00
JUMLAH HARGA BAHAN 2,309.00
C PERALATAN
D Jumlah A + B + C 5,681.75
E Overhead & Profit 15% x D 852.26
F Harga Satuan Pekerjaan (D+E) 6,534.01
A TENAGA
Pekerja L.01 OH 0.020 67,500.00 1,350.00
Tukang Kayu L.02 OH 0.200 81,000.00 16,200.00
Kepala Tukang L.03 OH 0.020 85,500.00 1,710.00
Mandor L.04 OH 0.003 90,000.00 225.00
JUMLAH TENAGA KERJA 19,485.00
B BAHAN
Wallpaper m2 1.200 45,000.00 54,000.00
Lem kg 0.200 34,200.00 6,840.00
JUMLAH HARGA BAHAN 60,840.00
C PERALATAN
D Jumlah A + B + C 80,325.00
E Overhead & Profit 15% x D 12,048.75
F Harga Satuan Pekerjaan (D+E) 92,373.75
A. 4.7.1.16 Pengecatan 1 m2 Permukaan Baja dengan Meni Besi 23,308.20
A TENAGA
Pekerja L.01 OH 0.020 67,500.00 1,350.00
Tukang Kayu L.02 OH 0.200 81,000.00 16,200.00
Kepala Tukang L.03 OH 0.002 85,500.00 171.00
Mandor L.04 OH 0.003 90,000.00 225.00
JUMLAH TENAGA KERJA 17,946.00
B BAHAN
Meni Besi Kg 0.100 19,800.00 1,980.00
Perekat / Lem Kg 0.010 34,200.00 342.00
JUMLAH HARGA BAHAN 2,322.00
C PERALATAN
D Jumlah A + B + C 20,268.00
E Overhead & Profit 15% x D 3,040.20
F Harga Satuan Pekerjaan (D+E) 23,308.20
A TENAGA
Pekerja L.01 OH 0.020 67,500.00 1,350.00
Tukang Kayu L.02 OH 0.200 81,000.00 16,200.00
Kepala Tukang L.03 OH 0.002 85,500.00 171.00
Mandor L.04 OH 0.003 90,000.00 225.00
JUMLAH TENAGA KERJA 17,946.00
B BAHAN
Cat Besi Kg 0.100 54,000.00 5,400.00
Perekat / Lem Kg 0.010 34,200.00 342.00
JUMLAH HARGA BAHAN 5,742.00
C PERALATAN
D Jumlah A + B + C 23,688.00
E Overhead & Profit 15% x D 3,553.20
F Harga Satuan Pekerjaan (D+E) 27,241.20
A. 4.7.1.17 Pengecatan 1 m2 Permukaan Baja dengan Meni Besi dengan Perancah 53,268.86
A TENAGA
Pekerja L.01 OH 0.250 67,500.00 16,875.00
Tukang Kayu L.02 OH 0.225 81,000.00 18,225.00
Kepala Tukang L.03 OH 0.023 85,500.00 1,923.75
Mandor L.04 OH 0.008 90,000.00 675.00
JUMLAH TENAGA KERJA 37,698.75
B BAHAN
Meni Besi Kg 0.100 19,800.00 1,980.00
Perekat / Lem Kg 0.010 34,200.00 342.00
Perancah Kayu m3 0.002 3,150,000.00 6,300.00
JUMLAH HARGA BAHAN 8,622.00
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.028 67,500.00 1,890.00
Tukang L.02 OH 0.042 81,000.00 3,402.00
Kepala Tukang L.03 OH 0.004 85,500.00 359.10
Mandor L.04 OH 0.003 90,000.00 270.00
JUMLAH TENAGA KERJA 5,921.10
B BAHAN
Cat waterproof 2 lapis Kg 0.180 81,000.00 14,580.00
JUMLAH HARGA BAHAN 14,580.00
C PERALATAN
D Jumlah A + B + C 20,501.10
E Overhead & Profit 15% x D 3,075.17
F Harga Satuan Pekerjaan (D+E) 23,576.27
BOW M. HARGA SATUAN PEKERJAAN LAIN-LAIN
BOW M. 1 Pemasangan 1 m2 Paving Hexagonal Kecil 6 cm isi 29 bh/m2 K.225 182,082.38
A TENAGA
Pekerja L.01 OH 0.300 67,500.00 20,250.00
Tukang Batu L.02 OH 0.150 81,000.00 12,150.00
Kepala Tukang L.03 OH 0.015 85,500.00 1,282.50
Mandor L.04 OH 0.015 90,000.00 1,350.00
JUMLAH TENAGA KERJA 35,032.50
B BAHAN
Paving Hexagonal Kecil K. 225 m2 1.000 89,100.00 89,100.00
Pasir Pasang m3 0.100 342,000.00 34,200.00
JUMLAH HARGA BAHAN 123,300.00
C PERALATAN
D Jumlah A + B + C 158,332.50
E Overhead & Profit 15% x D 23,749.88
F Harga Satuan Pekerjaan (D+E) 182,082.38
dst
BOW M. 2 Upah meletakkan Kanstin/Kerb tiap 100 kg 51,698.25
A TENAGA
Pekerja L.01 OH 0.500 67,500.00 33,750.00
Tukang Batu L.02 OH 0.100 81,000.00 8,100.00
Kepala Tukang L.03 OH 0.010 85,500.00 855.00
Mandor L.04 OH 0.025 90,000.00 2,250.00
JUMLAH TENAGA KERJA 44,955.00
B BAHAN
D Jumlah A + B + C 44,955.00
E Overhead & Profit 15% x D 6,743.25
F Harga Satuan Pekerjaan (D+E) 51,698.25
A TENAGA
D Jumlah A + B + C 881,235.00
E Overhead & Profit 15% x D 132,185.25
F Harga Satuan Pekerjaan (D+E) 1,013,420.25
BOW M. 4 Prmasangan 1 m' Kansteen batako 10x20x50 cm 59,705.05
A TENAGA
D Jumlah A + B + C 51,917.44
E Overhead & Profit 15% x D 7,787.62
F Harga Satuan Pekerjaan (D+E) 59,705.05
A TENAGA
D Jumlah A + B + C 123,917.44
E Overhead & Profit 15% x D 18,587.62
F Harga Satuan Pekerjaan (D+E) 142,505.05
BOW M. 5.a Pemasangan 1 m' Kansteen Lubang K. 250 ukuran 15/20x30x50 cm 136,755.05
A TENAGA
D Jumlah A + B + C 118,917.44
E Overhead & Profit 15% x D 17,837.62
F Harga Satuan Pekerjaan (D+E) 136,755.05
BOW M. 5.b Pemasangan 1 m' Kansteen Lubang K. 200 ukuran 15/20x30x50 cm 131,005.05
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
D Jumlah A + B + C 113,917.44
E Overhead & Profit 15% x D 17,087.62
F Harga Satuan Pekerjaan (D+E) 131,005.05
A TENAGA
D Jumlah A + B + C 115,917.44
E Overhead & Profit 15% x D 17,387.62
F Harga Satuan Pekerjaan (D+E) 133,305.05
BOW M. 6.a Pemasangan 1 m' Kansteen Standar K. 250 ukuran 15/20x30x50 cm 125,255.05
A TENAGA
D Jumlah A + B + C 108,917.44
E Overhead & Profit 15% x D 16,337.62
F Harga Satuan Pekerjaan (D+E) 125,255.05
BOW M. 6.b Pemasangan 1 m' Kansteen Standar K. 200 ukuran 15/20x30x50 cm 119,505.05
A TENAGA
JUMLAH TENAGA KERJA -
B BAHAN
Kansteen standar 15/20x30x50 cm K.200 bh 2.000 45,000.00 90,000.00
Perekat m3 0.002 1,013,420.25 2,026.84
Upah meletakkan 100 kg 0.230 51,698.25 11,890.60
JUMLAH HARGA BAHAN 103,917.44
C PERALATAN
D Jumlah A + B + C 103,917.44
E Overhead & Profit 15% x D 15,587.62
F Harga Satuan Pekerjaan (D+E) 119,505.05
A. 8.4.1. HARGA SATUAN PEKERJAAN PEMASANGAN PIPA
D Jumlah A + B + C 62,577.00
E Overhead & Profit 15% x D 9,386.55
F Harga Satuan Pekerjaan (D+E) 71,963.55
D Jumlah A + B + C 10,998.00
E Overhead & Profit 15% x D 1,649.70
F Harga Satuan Pekerjaan (D+E) 12,647.70
D Jumlah A + B + C 131,085.00
E Overhead & Profit 15% x D 19,662.75
F Harga Satuan Pekerjaan (D+E) 150,747.75
D Jumlah A + B + C 220,806.00
E Overhead & Profit 15% x D 33,120.90
F Harga Satuan Pekerjaan (D+E) 253,926.90
D Jumlah A + B + C 338,913.00
E Overhead & Profit 15% x D 50,836.95
F Harga Satuan Pekerjaan (D+E) 389,749.95
D Jumlah A + B + C 45,486.00
E Overhead & Profit 15% x D 6,822.90
F Harga Satuan Pekerjaan (D+E) 52,308.90
D Jumlah A + B + C 52,398.00
E Overhead & Profit 15% x D 7,859.70
F Harga Satuan Pekerjaan (D+E) 60,257.70
D Jumlah A + B + C 12,559.50
E Overhead & Profit 15% x D 1,883.93
F Harga Satuan Pekerjaan (D+E) 14,443.43
D Jumlah A + B + C 45,180.00
E Overhead & Profit 15% x D 6,777.00
F Harga Satuan Pekerjaan (D+E) 51,957.00
D Jumlah A + B + C 13,900.50
E Overhead & Profit 15% x D 2,085.08
F Harga Satuan Pekerjaan (D+E) 15,985.58
D Jumlah A + B + C 15,786.00
E Overhead & Profit 15% x D 2,367.90
F Harga Satuan Pekerjaan (D+E) 18,153.90
D Jumlah A + B + C 20,466.00
E Overhead & Profit 15% x D 3,069.90
F Harga Satuan Pekerjaan (D+E) 23,535.90
D Jumlah A + B + C 34,474.50
E Overhead & Profit 15% x D 5,171.18
F Harga Satuan Pekerjaan (D+E) 39,645.68
D Jumlah A + B + C 49,140.00
E Overhead & Profit 15% x D 7,371.00
F Harga Satuan Pekerjaan (D+E) 56,511.00
D Jumlah A + B + C 40,279.50
E Overhead & Profit 15% x D 6,041.93
F Harga Satuan Pekerjaan (D+E) 46,321.43
D Jumlah A + B + C 46,800.00
E Overhead & Profit 15% x D 7,020.00
F Harga Satuan Pekerjaan (D+E) 53,820.00
D Jumlah A + B + C 52,353.00
E Overhead & Profit 15% x D 7,852.95
F Harga Satuan Pekerjaan (D+E) 60,205.95
D Jumlah A + B + C 59,238.00
E Overhead & Profit 15% x D 8,885.70
F Harga Satuan Pekerjaan (D+E) 68,123.70
D Jumlah A + B + C 93,168.00
E Overhead & Profit 15% x D 13,975.20
F Harga Satuan Pekerjaan (D+E) 107,143.20
D Jumlah A + B + C 111,082.50
E Overhead & Profit 15% x D 16,662.38
F Harga Satuan Pekerjaan (D+E) 127,744.88
D Jumlah A + B + C 112,104.00
E Overhead & Profit 15% x D 16,815.60
F Harga Satuan Pekerjaan (D+E) 128,919.60
D Jumlah A + B + C 216,355.50
E Overhead & Profit 15% x D 32,453.33
F Harga Satuan Pekerjaan (D+E) 248,808.83
D Jumlah A + B + C 221,701.50
E Overhead & Profit 15% x D 33,255.23
F Harga Satuan Pekerjaan (D+E) 254,956.73
D Jumlah A + B + C 227,830.50
E Overhead & Profit 15% x D 34,174.58
F Harga Satuan Pekerjaan (D+E) 262,005.08
D Jumlah A + B + C 250,213.50
E Overhead & Profit 15% x D 37,532.03
F Harga Satuan Pekerjaan (D+E) 287,745.53
D Jumlah A + B + C 110,632.50
E Overhead & Profit 15% x D 16,594.88
F Harga Satuan Pekerjaan (D+E) 127,227.38
D Jumlah A + B + C 122,152.50
E Overhead & Profit 15% x D 18,322.88
F Harga Satuan Pekerjaan (D+E) 140,475.38
D Jumlah A + B + C 48,057.30
E Overhead & Profit 15% x D 7,208.60
F Harga Satuan Pekerjaan (D+E) 55,265.90
D Jumlah A + B + C 55,473.30
E Overhead & Profit 15% x D 8,321.00
F Harga Satuan Pekerjaan (D+E) 63,794.30
D Jumlah A + B + C 61,869.60
E Overhead & Profit 15% x D 9,280.44
F Harga Satuan Pekerjaan (D+E) 71,150.04
D Jumlah A + B + C 67,431.60
E Overhead & Profit 15% x D 10,114.74
F Harga Satuan Pekerjaan (D+E) 77,546.34
D Jumlah A + B + C 104,975.10
E Overhead & Profit 15% x D 15,746.27
F Harga Satuan Pekerjaan (D+E) 120,721.37
D Jumlah A + B + C 124,627.50
E Overhead & Profit 15% x D 18,694.13
F Harga Satuan Pekerjaan (D+E) 143,321.63
D Jumlah A + B + C 132,970.50
E Overhead & Profit 15% x D 19,945.58
F Harga Satuan Pekerjaan (D+E) 152,916.08
D Jumlah A + B + C 544.50
E Overhead & Profit 15% x D 81.68
F Harga Satuan Pekerjaan (D+E) 626.18
D Jumlah A + B + C 1,602.00
E Overhead & Profit 15% x D 240.30
F Harga Satuan Pekerjaan (D+E) 1,842.30
D Jumlah A + B + C 2,556.00
E Overhead & Profit 15% x D 383.40
F Harga Satuan Pekerjaan (D+E) 2,939.40
D Jumlah A + B + C 3,577.50
E Overhead & Profit 15% x D 536.63
F Harga Satuan Pekerjaan (D+E) 4,114.13
D Jumlah A + B + C 9,427.50
E Overhead & Profit 15% x D 1,414.13
F Harga Satuan Pekerjaan (D+E) 10,841.63
D Jumlah A + B + C 14,994.00
E Overhead & Profit 15% x D 2,249.10
F Harga Satuan Pekerjaan (D+E) 17,243.10
D Jumlah A + B + C 18,049.50
E Overhead & Profit 15% x D 2,707.43
F Harga Satuan Pekerjaan (D+E) 20,756.93
D Jumlah A + B + C 2,988.00
E Overhead & Profit 15% x D 448.20
F Harga Satuan Pekerjaan (D+E) 3,436.20
D Jumlah A + B + C 6,489.00
E Overhead & Profit 15% x D 973.35
F Harga Satuan Pekerjaan (D+E) 7,462.35
D Jumlah A + B + C 8,878.50
E Overhead & Profit 15% x D 1,331.78
F Harga Satuan Pekerjaan (D+E) 10,210.28
D Jumlah A + B + C 11,709.00
E Overhead & Profit 15% x D 1,756.35
F Harga Satuan Pekerjaan (D+E) 13,465.35
D Jumlah A + B + C 18,963.00
E Overhead & Profit 15% x D 2,844.45
F Harga Satuan Pekerjaan (D+E) 21,807.45
D Jumlah A + B + C 25,726.50
E Overhead & Profit 15% x D 3,858.98
F Harga Satuan Pekerjaan (D+E) 29,585.48
D Jumlah A + B + C 32,481.00
E Overhead & Profit 15% x D 4,872.15
F Harga Satuan Pekerjaan (D+E) 37,353.15
D Jumlah A + B + C 2,272.50
E Overhead & Profit 15% x D 340.88
F Harga Satuan Pekerjaan (D+E) 2,613.38
D Jumlah A + B + C 6,894.00
E Overhead & Profit 15% x D 1,034.10
F Harga Satuan Pekerjaan (D+E) 7,928.10
D Jumlah A + B + C 10,746.00
E Overhead & Profit 15% x D 1,611.90
F Harga Satuan Pekerjaan (D+E) 12,357.90
D Jumlah A + B + C 15,358.50
E Overhead & Profit 15% x D 2,303.78
F Harga Satuan Pekerjaan (D+E) 17,662.28
D Jumlah A + B + C 39,780.00
E Overhead & Profit 15% x D 5,967.00
F Harga Satuan Pekerjaan (D+E) 45,747.00
D Jumlah A + B + C 55,489.50
E Overhead & Profit 15% x D 8,323.43
F Harga Satuan Pekerjaan (D+E) 63,812.93
D Jumlah A + B + C 58,932.00
E Overhead & Profit 15% x D 8,839.80
F Harga Satuan Pekerjaan (D+E) 67,771.80
D Jumlah A + B + C 6,581.70
E Overhead & Profit 15% x D 987.26
F Harga Satuan Pekerjaan (D+E) 7,568.96
D Jumlah A + B + C 10,382.40
E Overhead & Profit 15% x D 1,557.36
F Harga Satuan Pekerjaan (D+E) 11,939.76
D Jumlah A + B + C 14,739.30
E Overhead & Profit 15% x D 2,210.90
F Harga Satuan Pekerjaan (D+E) 16,950.20
D Jumlah A + B + C 33,928.20
E Overhead & Profit 15% x D 5,089.23
F Harga Satuan Pekerjaan (D+E) 39,017.43
D Jumlah A + B + C 44,125.20
E Overhead & Profit 15% x D 6,618.78
F Harga Satuan Pekerjaan (D+E) 50,743.98
D Jumlah A + B + C 47,462.40
E Overhead & Profit 15% x D 7,119.36
F Harga Satuan Pekerjaan (D+E) 54,581.76
D Jumlah A + B + C 2,646.00
E Overhead & Profit 15% x D 396.90
F Harga Satuan Pekerjaan (D+E) 3,042.90
D Jumlah A + B + C 7,834.50
E Overhead & Profit 15% x D 1,175.18
F Harga Satuan Pekerjaan (D+E) 9,009.68
D Jumlah A + B + C 12,334.50
E Overhead & Profit 15% x D 1,850.18
F Harga Satuan Pekerjaan (D+E) 14,184.68
D Jumlah A + B + C 17,037.00
E Overhead & Profit 15% x D 2,555.55
F Harga Satuan Pekerjaan (D+E) 19,592.55
D Jumlah A + B + C 44,145.00
E Overhead & Profit 15% x D 6,621.75
F Harga Satuan Pekerjaan (D+E) 50,766.75
D Jumlah A + B + C 61,465.50
E Overhead & Profit 15% x D 9,219.83
F Harga Satuan Pekerjaan (D+E) 70,685.33
D Jumlah A + B + C 69,016.50
E Overhead & Profit 15% x D 10,352.48
F Harga Satuan Pekerjaan (D+E) 79,368.98
D Jumlah A + B + C 167,242.50
E Overhead & Profit 15% x D 25,086.38
F Harga Satuan Pekerjaan (D+E) 192,328.88
D Jumlah A + B + C 200,502.00
E Overhead & Profit 15% x D 30,075.30
F Harga Satuan Pekerjaan (D+E) 230,577.30
D Jumlah A + B + C 200,502.00
E Overhead & Profit 15% x D 30,075.30
F Harga Satuan Pekerjaan (D+E) 230,577.30
D Jumlah A + B + C 234,000.00
E Overhead & Profit 15% x D 35,100.00
F Harga Satuan Pekerjaan (D+E) 269,100.00
D Jumlah A + B + C 12,402.00
E Overhead & Profit 15% x D 1,860.30
F Harga Satuan Pekerjaan (D+E) 14,262.30
D Jumlah A + B + C 25,272.00
E Overhead & Profit 15% x D 3,790.80
F Harga Satuan Pekerjaan (D+E) 29,062.80
D Jumlah A + B + C 38,142.00
E Overhead & Profit 15% x D 5,721.30
F Harga Satuan Pekerjaan (D+E) 43,863.30
D Jumlah A + B + C 51,012.00
E Overhead & Profit 15% x D 7,651.80
F Harga Satuan Pekerjaan (D+E) 58,663.80
D Jumlah A + B + C 171,522.00
E Overhead & Profit 15% x D 25,728.30
F Harga Satuan Pekerjaan (D+E) 197,250.30
A. 8.4.4. 2 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 100 mm 221,469.30
D Jumlah A + B + C 192,582.00
E Overhead & Profit 15% x D 28,887.30
F Harga Satuan Pekerjaan (D+E) 221,469.30
D Jumlah A + B + C 245,232.00
E Overhead & Profit 15% x D 36,784.80
F Harga Satuan Pekerjaan (D+E) 282,016.80
A. 8.4.4. 4 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 200 mm 342,564.30
D Jumlah A + B + C 297,882.00
E Overhead & Profit 15% x D 44,682.30
F Harga Satuan Pekerjaan (D+E) 342,564.30
D Jumlah A + B + C 350,532.00
E Overhead & Profit 15% x D 52,579.80
F Harga Satuan Pekerjaan (D+E) 403,111.80
A. 8.4.4. 6 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 300 mm 463,659.30
D Jumlah A + B + C 403,182.00
E Overhead & Profit 15% x D 60,477.30
F Harga Satuan Pekerjaan (D+E) 463,659.30
D Jumlah A + B + C 1,296.00
E Overhead & Profit 15% x D 194.40
F Harga Satuan Pekerjaan (D+E) 1,490.40
D Jumlah A + B + C 1,440.00
E Overhead & Profit 15% x D 216.00
F Harga Satuan Pekerjaan (D+E) 1,656.00
D Jumlah A + B + C 1,728.00
E Overhead & Profit 15% x D 259.20
F Harga Satuan Pekerjaan (D+E) 1,987.20
D Jumlah A + B + C 2,448.00
E Overhead & Profit 15% x D 367.20
F Harga Satuan Pekerjaan (D+E) 2,815.20
D Jumlah A + B + C 3,384.00
E Overhead & Profit 15% x D 507.60
F Harga Satuan Pekerjaan (D+E) 3,891.60
D Jumlah A + B + C 4,680.00
E Overhead & Profit 15% x D 702.00
F Harga Satuan Pekerjaan (D+E) 5,382.00
D Jumlah A + B + C 6,264.00
E Overhead & Profit 15% x D 939.60
F Harga Satuan Pekerjaan (D+E) 7,203.60