Anda di halaman 1dari 267

DAFTAR HARGA SATUAN UPAH, BAHAN DAN PERALATAN

DINAS PEKERJAAN UMUM KABUPATEN SEMARANG


TAHUN 2018 SEMESTER 2

HARGA HARGA
SATUAN SATUAN
NO URAIAN SATUAN
SEMESTER 1 SEMESTER 2
Rp. Rp.

1 2 3 4 5

Tahun Pengalaman/ Tk.


I UPAH TENAGA KERJA
Pendidikan;
A TENAGA AHLI/KONSULTAN S1 S2 S3
1 Tenaga Ahli
Ahli Pratama
- Gol. I-A 1 Org/Bulan 5,200,000 5,200,000
- Gol. I-B 2 Org/Bulan 5,500,000 5,500,000
- Gol. I-C 3 Org/Bulan 5,800,000 5,800,000
- Gol. I-D 4 Org/Bulan 6,100,000 6,100,000

Ahli Muda
- Gol. II-A 5 1 Org/Bulan 6,500,000 6,500,000
- Gol. II-B 6 2 Org/Bulan 7,100,000 7,100,000
- Gol. II-C 7 3 Org/Bulan 7,700,000 7,700,000
- Gol. II-D 8 4 Org/Bulan 8,400,000 8,400,000

Ahli Madya
- Gol. III-A 9 5 1 Org/Bulan 8,800,000 8,800,000
- Gol. III-B 10 6 2 Org/Bulan 9,400,000 9,400,000
- Gol. III-C 11 7 3 Org/Bulan 10,000,000 10,000,000
- Gol. III-D 12 8 4 Org/Bulan 10,600,000 10,600,000

Ahli Utama
- Gol. IV-A 13 9 5 Org/Bulan 10,500,000 10,500,000
- Gol. IV-B 14 10 6 Org/Bulan 11,800,000 11,800,000
- Gol. IV-C 15 11 7 Org/Bulan 12,400,000 12,400,000
- Gol. IV-D 16 12 8 Org/Bulan 13,100,000 13,100,000

Ahli Kepala
- Gol. ]V-A 17 13 9 Org/Bulan 13,800,000 13,800,000
- Gol. V-B 18 14 10 Org/Bulan 14,200,000 14,200,000
- Gol. V-C 19 15 11 Org/Bulan 14,700,000 14,700,000
- Gol. V-D 20 16 12 Org/Bulan 15,200,000 15,200,000

Ahli Pembina Kepala


- Gol. VI-A 21 17 13 Org/Bulan 15,800,000 15,800,000
- Gol. VI-B 22 18 14 Org/Bulan 16,300,000 16,300,000
- Gol. VI-C 23 19 15 Org/Bulan 16,900,000 16,900,000
- Gol. VI-D 24 20 16 Org/Bulan 17,500,000 17,500,000
- Gol. VI-E 25 21 17 Org/Bulan 18,000,000 18,000,000

2 Asisten Muda : S1 (baru lulus) pengalaman 1 s/d 4 tahun Org/Bulan 4,600,000 4,600,000
3 Teknisi
a. S 0 / D3 pengalaman 1 s/d 3 tahun Org/Bulan 3,900,000 3,900,000
b. S 0 / D3 pengalaman 4 s/d 7 tahun Org/Bulan 4,600,000 4,600,000
c. S 0 / D3 pengalaman 8 s/d 11 tahun Org/Bulan 5,200,000 5,200,000
4 Tenaga Penunjang
HARGA HARGA
SATUAN SATUAN
NO URAIAN SATUAN
SEMESTER 1 SEMESTER 2
Rp. Rp.

a. Sekretaris S.0 / D3 pengalaman 1 s/d 3 tahun Org/Bulan 2,500,000 2,500,000


b. Operator Komputer S 0 / D3 pengalaman 4 s/d 7 tahun Org/Bulan 2,500,000 2,500,000
c. Surveyor S.0 / D3 pengalaman 1 s/d 3 tahun Org/Bulan 2,500,000 2,500,000
d. Office Manager S.0 / D3 pengalaman 1 s/d 3 tahun Org/Bulan 3,500,000 3,500,000
e. Tenaga Pembantu, SLTA pengalaman 1 s/d 3 tahun Org/Bulan 1,700,000 1,700,000
f. Juru Gambar, D3 pengalaman 1 s/d 3 tahun Org/Bulan 2,000,000 2,000,000
g. Juru Gambar, D3 pengalaman 4 s/d 7 tahun Org/Bulan 2,500,000 2,500,000
h. Teknisi Jaringan Komputer, SLTA pengalaman 1 s/d 3 tahun Org/Bulan 1,700,000 1,700,000
HARGA HARGA
SATUAN SATUAN
NO URAIAN SATUAN
SEMESTER 1 SEMESTER 2
Rp. Rp.

I UPAH TENAGA KERJA


1 Mandor . org/hari 100,000 100,000
2 Mekanik terlatih . org/hari 90,000 90,000
3 Kepala tukang . org/hari 95,000 95,000
4 Tukang kayu . org/hari 90,000 90,000
5 Tukang batu . org/hari 90,000 90,000
6 Tukang besi . org/hari 90,000 90,000
7 Tukang cat . org/hari 90,000 90,000
8 Tukang plitur . org/hari 90,000 90,000
9 Tukang listrik . org/hari 90,000 90,000
10 Operator terlatih . org/hari 90,000 90,000
11 Operator semi terlatih. org/hari 80,000 80,000
12 Pembantu operator. org/hari 75,000 75,000
13 Sopir. org/hari 90,000 90,000
14 Sopir angkut orang. org/hari 90,000 90,000
15 Pekerja. org/hari 75,000 75,000
16 Buruh terlatih. org/hari 75,000 75,000
17 Buruh semi terlatih. org/hari 75,000 75,000
18 Buruh tak terlatih. org/hari 75,000 75,000
19 Penganyam bronjong org/hari 90,000 90,000
20 Penjaga malam. org/hari 75,000 75,000
21 Tukang masak aspal/juru godog. org/hari 75,000 75,000
22 Tukang leideng. org/hari 90,000 90,000
23 Masinis. org/hari 90,000 90,000
24 Pembantu masinis. org/hari 75,000 75,000

II BAHAN/MATERIAL
A BAHAN DASAR
BATU KALI
1 Batu pecah 0,5/1 (pecah mesin) ( chip ) M3 350,000 350,000
2 Batu pecah 1/2 (pecah mesin) M3 350,000 350,000
3 Batu pecah 2/3 (pecah mesin) M3 330,000 330,000
4 Batu pecah 3/5 (pecah mesin) M3 330,000 330,000
5 Batu pecah 4/6 (pecah tangan) M3 300,000 300,000
6 Batu pecah 5/7 (pecah tangan) M3 300,000 300,000
7 Batu belah / pecah 7/10 - 10/15 - 15/20 M3 350,000 350,000
8 Batu belah/pecah besar M3 330,000 330,000
9 Batu blondhos M3 165,000 200,000

BATU BATA
1 Batu Bata biasa Buah 900 900

PASIR
1 Pasir beton M3 380,000 380,000
2 Pasir pasang M3 380,000 380,000
3 Pasir urug M3 143,000 143,000
4 Sirtu M3 220,000 220,000

TANAH
1 Tanah Lempung M3 49,500 50,000
2 Tanah Padas M3 77,000 80,000
3 Tanah urug M3 71,500 75,000
HARGA HARGA
SATUAN SATUAN
NO URAIAN SATUAN
SEMESTER 1 SEMESTER 2
Rp. Rp.

PORTLAND CEMENT
1 PC / Cement (40 Kg) Zak 45,500 45,500
PC / Cement Kg 1,138 1,138
2 PC / Semen putih (40 kg) Zak 90,000 90,000
PC / Semen warna Kg 2,250 2,250
3 Semen Instant MU 380 - Perekat Bata Ringan Kg 4,100 4,100
4 Semen Instant MU 100 - Plesteran Kg 1,600 1,600
5 Semen Instant MU 200 - Acian Kg 4,300 4,300

KAPUR
1 Kapur pasang Kg 6,600 6,600
2 Kapur pasang M3 247,500 247,500
HARGA HARGA
SATUAN SATUAN
NO URAIAN SATUAN
SEMESTER 1 SEMESTER 2
Rp. Rp.

B BAHAN PENUTUP ATAP


GENTENG BETON
1 Genteng beton natural (9bh/m2) Buah 4,800 4,800
2 Genteng beton natural (11bh/m2) Buah 7,700 7,700
3 Genteng beton cat (9bh/m2) Buah 6,500 6,500
4 Genteng Kerpus beton natural (3 bh/m)-Gt.9 Buah 7,500 7,500
5 Genteng Kerpus beton natural (3 bh/m)-Gt.11 Buah 7,000 7,000
6 Genteng beton kerpus (3bh/m) Buah 7,800 8,500
7 Genteng Beton Flat Buah 10,000 10,000

GENTENG TANAH LIAT


1 Genteng tanah liat Kebumen kodok (25 bh/m2) Buah 2,800 2,800
2 Genteng tanah liat Kebumen (biasa) plentong (25 bh/m2) Buah 2,700 2,700
5 Genteng tanah liat Lokal Kodok (25 bh/m2) Buah 2,000 2,000
6 Genteng tanah liat Lokal plentong (25 bh/m2) Buah 1,500 1,500
9 Genteng tanah liat Jatiwangi (biasa) Kodok (25 bh/m2) Buah 2,000 6,000
10 Genteng tanah liat Jatiwangi (biasa) plentong (18 bh/m2) Buah 3,000 3,000
11 Genteng tanah liat Kebumen (biasa) kerpus plentong Buah 11,000 5,400
12 Genteng tanah liat Kebumen (biasa) kerpus kodok Buah 11,000 5,600
13 Genteng Kerpus tanah (5 bh/m) ex.Kebumen Buah 10,000 4,000
14 Genteng tanah liat Jatiwangi (biasa) kerpus plentong Buah 5,500 7,000
15 Genteng tanah liat Jatiwangi (glasur) kerpus plentong Buah 7,000 7,000
22 Genteng gelombang bitumen Lembar 160,000 160,000

ASBES GELOMBANG BESAR


1 Asbes gel. Kecil 0,9 m x 2,10 m Lembar 70,000 70,000
2 Asbes gel. Kecil 0,9 m x 2,40 m Lembar 79,500 79,500
3 Asbes gel. Kecil 0,9 m x 2,90 m Lembar 100,000 100,000
4 Asbes gel. Besar 1,02 m x 2,10 m Lembar 90,700 90,700
5 Asbes gel. Besar 1,02 m x 2,40 m Lembar 110,000 110,000
6 Asbes gel. Besar 1,02 m x 3,00 m Lembar 132,000 132,000

ASBES GELOMBANG KECIL


1 Asbes gel. Kecil 0,9 m x 2,10 m Lembar 62,700 62,700
2 Asbes gel. Kecil 0,9 m x 2,40 m Lembar 71,000 78,000
3 Asbes gel. Kecil 0,9 m x 2,90 m Lembar 86,100 86,100
4 Asbes gel. Kecil 1,05 m x 2,10 m Lembar 65,400 65,400
5 Asbes gel. Kecil 1,05 m x 2,40 m Lembar 74,800 74,800
6 Asbes gel. Kecil 1,05 m x 3,00 m Lembar 93,500 93,500

ASBES NOK
1 Nok steel gelombang besar 108 cm Buah 46,500 46,500
2 Nok steel gelombang kecil 105 cm Buah 30,500 30,750

SENG PLAT
1 Seng plat BJLS 20 x 90 cm M' 24,800 24,800
2 Seng plat BJLS 30 x 60 cm M' 22,000 22,000

SENG GELOMBANG
1 Seng gelombang BJLS 20, panjang 180 cm x 85 cm lembar 48,400 50,250
2 Seng gelombang BJLS 20, panjang 210 cm x 85 cm lembar 50,000 58,000
3 Seng gelombang BJLS 20, panjang 240 cm x 85 cm lembar 56,000 66,250
HARGA HARGA
SATUAN SATUAN
NO URAIAN SATUAN
SEMESTER 1 SEMESTER 2
Rp. Rp.

4 Seng gelombang BJLS 20, panjang 300 cm x 85 cm lembar 68,000 82,000


5 Asbes Kerpus Gel. 1,0 m x 1,0 m Lembar 30,500 36,000

GALVALUME
1 Atap Galvalume warna natural uk. 0,3 x 2,1, t.0,3 mm M2 63,200 80,000
2 Atap Galvalume fin. Warna tebal 0,3 mm M2 43,400 65,000
3 Atap Galvalume Berpasir tebal 0.30 cm tebal 0,3 mm M2 90,000 94,000
4 Nok Galvalume Berpasir M' 82,200 85,500
HARGA HARGA
SATUAN SATUAN
NO URAIAN SATUAN
SEMESTER 1 SEMESTER 2
Rp. Rp.

C BAHAN KAYU
BENGKIRAI
1 Kayu bengkirai (balok) M3 11,649,300 11,649,000
2 Kayu bengkirai (papan) M3 13,000,000 13,000,000
3 Kayu bengkirai 2/3 M3 9,739,600 9,750,000
4 Kayu bengkirai 3/5 M3 11,000,000 9,750,000
5 Kayu bengkirai 5/7 M3 8,773,800 9,750,000

KRUING
1 Kayu Kruing (Balok) M3 7,893,600 7,800,000
2 Kayu Kruing (papan) M3 13,062,500 13,000,000
3 Kayu Kruing 2/3 M3 8,020,800 7,150,000
4 Kayu Kruing 3/5 M3 7,104,200 7,150,000
5 Kayu Kruing 5/7 M3 7,451,200 7,150,000

MERANTI
1 Kayu Meranti (Balok) M3 5,300,000 5,300,000
2 Kayu Meranti (papan) M3 6,000,000 6,000,000
3 Kayu Meranti 2/3 M3 5,600,800 5,600,000
4 Kayu Meranti 3/5 M3 5,600,800 5,600,000
5 Kayu Meranti 5/7 M3 5,600,800 5,600,000

KAMPER
1 Kayu kamfer (balok) M3 8,500,000 8,500,000
2 Kayu Kamfer (papan) M3 10,000,000 11,000,000
3 Kayu kamfer 2/3 M3 6,000,000 7,900,000
4 Kayu kamfer 3/5 M3 6,000,000 7,900,000
5 Kayu kamfer 5/7 M3 7,660,700 7,900,000

LANAN
1 Kayu Lanan/Tahun papan M3 4,100,000 4,100,000
2 Kayu Lanan/Tahun Balok 8/12 M3 4,100,000 4,100,000
3 Kayu Lanan/Tahun Balok 6/12 M3 3,615,000 3,615,000
4 Kayu Lanan/Tahun Usuk 5/7 M3 3,000,000 3,000,000
5 Kayu Lanan/Tahun Usuk 4/6 M3 1,100,000 1,100,000
6 Kayu Lanan/Tahun Reng 3/5 M3 1,100,000 1,100,000
7 Kayu Lanan/Tahun Reng 2/3 M3 1,100,000 1,100,000

SENGON
1 Kayu Sengon Balok 8/12 M3 3,450,000 3,500,000
2 Kayu Sengon Balok 6/12 M3 4,583,300 3,300,000
3 Kayu Sengon Usuk 5/7 M3 2,933,300 3,000,000
4 Kayu Sengon Usuk 4/6 M3 2,673,600 2,600,000
5 Kayu Sengon Reng 3/5 M3 2,000,000 2,600,000
6 Kayu Sengon Reng 2/3 M3 1,200,000 2,600,000
7 Kayu Sengon Papan M3 1,203,100 1,200,000

JATI
1 Kayu Jati (balok) Kw.II M3 22,550,000 22,000,000
2 Kayu Jati papan KW II M3 25,300,000 20,500,000
3 Kayu Jati Kw.I M3 29,000,000 28,500,000
HARGA HARGA
SATUAN SATUAN
NO URAIAN SATUAN
SEMESTER 1 SEMESTER 2
Rp. Rp.

DOLKEN
1 Kayu dolok DN / Dolken 8-10 cm Batang 35,000 17,500
2 Kayu cetakan M3 3,450,000 3,400,000
3 Kayu bakar M3 143,000 140,000
4 Bambu Ø 8-10 cm p = 4 m Batang 11,000 12,500
5 Bambu Ø 10-12 cm p = 4 m Batang 25,000 23,500
6 Batang kelapa 4 m Batang 300,000 400,000

TEAKWOOD
1 Taek wood 90 x 210 x 4 mm Lembar 72,500 75,000
2 Taek wood 90 x 210 x 9 mm Lembar 115,000 115,000
HARGA HARGA
SATUAN SATUAN
NO URAIAN SATUAN
SEMESTER 1 SEMESTER 2
Rp. Rp.

MULTIPLEK
1 Multiplek 120 x 240 x 6 mm Lembar 93,000 90,000
2 Multiplek 120 x 240 x 9 mm Lembar 140,000 110,000
3 Multiplek 120 x 240 x 12 mm Lembar 167,000 140,000

TRIPLEK
1 Triplek 120 x 240 x 3 mm Lembar 71,500 71,000
Triplek 120 x 240 x 4 mm Lembar 75,000
2 Triplek 120 x 240 x 5 mm Lembar 80,700 80,000

D BAHAN PENUTUP DINDING / LANTAI


KERAMIK
1 Ubin keramik 20 x 20 (polos) M2 57,300 57,000
2 Ubin keramik 20 x 20 (motif) M2 54,500 54,500
3 Ubin keramik 30 x 30 (polos) M2 44,000 44,000
4 Ubin keramik 30 x 30 (motif) M2 55,000 55,000
5 Ubin keramik 40 x 40 (polos) M2 55,000 55,000
6 Ubin keramik 40 x 40 (motif) M2 66,000 66,000
7 Ubin keramik 60 x 60 (motif) M2 137,500 137,500
8 Ubin keramik 6 X 20 (lis keramik) buah 4,500 4,500
9 Keramik dinding 20 x 20 M2 58,500 58,500
10 Keramik dinding 20 x 25 M2 57,700 57,500
11 Keramik dinding 25 x 40 M2 82,500 82,500

GRANIT
1 Ubin Granit 60 x 60 ex. Granito, Platinum dll M2 245,000 250,000
2 Ubin Granit 60 x 60 ex. Indogress, garuda dll M2 126,500 100,000

LAIN-LAIN
1 Batu candi 30 x 30 M2 137,500 130,000
2 Batu koral sikat M2 60,000 75,000
3 Batu Palimanan M2 143,000 160,000
4 Batu andesit bakar M2 137,000 130,000
5 Batu lempeng M2 70,000 90,000
6 Batu serit hitam M2 100,000 110,000
7 Hospital Plint 10x40 cm ex. Milan / Roman 25 bh/Dos 1,000,000 975,000
8 Hospital Plint 8x30 cm ex. Milan / Roman 30 bh/Dos 543,000 550,000
9 Ubin defebel 20x20 Bh 40,000 40,000
10 Ubin anti sleep Bh 60,000 60,000
11 Marmer 100x100 M2 2,000,000 1,950,000
12 Karpet M2 130,000 130,000
13 Lantai Parquet M2 210,000 210,000
14 Lantai Vinyl M2 495,000 495,000
15 Vynil Untuk Medikal ( Terpasang ) M2 540,000 650,000
16 Kuku Macan 10 cm Bh 1,800 1,000
17 Stepnosing Keramik Uk. 8x30 cm Bh 12,500 12,000
18 Stepnosing Keramik Uk. 8x40 cm Bh 15,000 15,500
19 Stepnosing Keramik Uk. 8x60 cm Bh 30,000 30,000
HARGA HARGA
SATUAN SATUAN
NO URAIAN SATUAN
SEMESTER 1 SEMESTER 2
Rp. Rp.

E BAHAN CETAK
BUIS BETON
1 Gorong-gorong DN 20 cm , panjang 1 meter Buah 49,500 55,500
2 Gorong-gorong DN 30 cm, panjang 1 meter Buah 71,000 62,500
3 Gorong-gorong DN 40 cm, panjang 1 meter Buah 82,500 85,000
4 Gorong-gorong DN 50 cm , panjang 1 meter Buah 110,000 92,500
5 Gorong-gorong DN 60 cm, panjang 1 meter Buah 143,000 100,000
6 Gorong-gorong DN 70 cm, panjang 0,5 meter Buah 132,000 110,000
7 Gorong-gorong DN 80 cm, panjang 0.5 meter Buah 145,000 115,000
8 Gorong-gorong DN 100 cm panjang 0.5 meter Buah 247,000 175,000
9 Got Type U - 15 cm, panjang 1 m Buah 33,000 33,000
10 Got Type U - 20 cm, panjang 1 m Buah 44,000 44,000
11 Got Type U - 30 cm, panjang 1 m Buah 55,000 55,000
12 Got Type U - 40 cm, panjang 1 m Buah 71,500 71,500
13 Buis Beton Bulat Q 30 x 100 = 3 cm Bh 79,200 79,000
14 Buis Beton Bulat Q 40 x 100 = 4 cm Bh 106,700 105,000
15 Buis Beton Bulat Q 50 x 100 = 5 cm Bh 89,100 110,000
16 Buis Beton Bulat Q 60 x 50 = 6 cm Bh 118,800 118,000

ROOSTER
1 Rooster 10 x 20 cm (PC) Buah 16,500 11,000
2 Rooster 15 x 25 cm (PC) Buah 19,200 14,000
3 Rooster 15 x 30 cm (PC) Buah 11,300 17,000
4 Rooster 20 x 20 cm (PC) Buah 17,900 13,500
5 Rooster 25 x 25 cm (PC) Buah 22,000 17,500
6 Rooster 30 x 30 cm (PC) Buah 27,500 20,000

PANEL BETON
1 Pagar Panel Beton Precast 160 m2 = 4 Lembar Panel 225x17,5x17,5 cm (harga ter M' 641,000
2 Pagar Panel Beton Precast 200 m2 = 5 Lembar Panel 280x17,5x17,5 cm (harga ter M' 717,000
3 Pagar Panel Beton Precast 240 m2 = 6 Lembar Panel 320x17,5x17,5 cm (harga ter M' 823,000
4 Pagar Panel Beton Precast 280 m2 = 7 Lembar Panel 370x17,5x17,5 cm (harga ter M' 944,000
5 Pagar Panel Beton Precast 320 m2 = 8 Lembar Panel 400x17,5x17,5 cm (harga ter M' 1,020,000

DINDING BLOCK
1 Bataco 40 x 20 x 10 cm Buah 3,000 3,000
2 Bata Exspose Buah 4,000 4,500
3 Bata Ringan
Ukuran 7,5 x 20 x 60 cm (isi 111 buah/m3) M3 760,000 900,000
Ukuran 10 x 20 x 60 cm (isi 83 buah/m3) M3 810,000 810,000

PAVING BLOCK ( SEKELAS ALDAS )


1 Paving 6 cm,29 bh/M²(Hexagonal Kecil) K.300 Ukuran 11,5x6 M2 66,000 112,000
2 Paving 6 cm,29 bh/M²(Hexagonal Kecil) K.225 Ukuran 11,5x6 M2 75,000 99,000
3 Paving 8 cm,29 bh/M²(Hexagonal Kecil) K.300 Ukuran 11,5x8 M2 75,000 147,500
7 Paving Hexagonal Besar 17,5x6 K.400 M2 72,500 135,500
8 Paving Hexagonal Besar 17,5x8 K.400 M2 96,000 178,000
9 Paving Hexagonal L 10x6 K.400 M2 96,700 122,000
12 Paving Holland 10,5x21x6 K.250 M2 70,000 106,500
13 Paving Holland 10,5x21x8 K.400 M2 95,000 153,500
14 Paving Holland 10,5x21x10 K.400 M2 123,000 198,000
19 Paving Square 10,5x10,5x6 K.400 M2 84,500 122,000
HARGA HARGA
SATUAN SATUAN
NO URAIAN SATUAN
SEMESTER 1 SEMESTER 2
Rp. Rp.

20 Paving Square 12x12x6 K.400 M2 84,500 122,000


22 Paving Square 16x16x6 K.400 M2 85,000 122,000
26 Paving Topi uskup, 67 bh/M² K.300 M2 116,000 112,000
HARGA HARGA
SATUAN SATUAN
NO URAIAN SATUAN
SEMESTER 1 SEMESTER 2
Rp. Rp.

F BAHAN BESI
BESI BETON
1 Besi beton polos SNI Kg 10,500 10,500
2 Besi beton ulir SNI Kg 10,500 10,500
3 Besi presstred polos Kg 8,800 9,000
4 Besi sengkang (angkur, baut) Kg 21,000 21,000

BESI PROFIL
1 Besi Profil C Kg 13,200 13,000
2 Baja IWF Kg 13,200 13,000
3 Besi Profil Siku Kg 13,200 13,000

BESI PLAT
1 Besi strip plat t= 2 mm Kg 13,200 13,000
2 Besi strip 0,5 cm Kg 25,300 13,000

BRC
1 BRC t = 120 x 240 cm Galvanis Ø 6mm Buah 300,000 242,500
2 BRC t = 150 x 240 cm Galvanis Ø 6mm Buah 385,000 360,000
3 BRC t = 120 x 240 cm Galvanis Ø 8mm Buah 660,000 490,000
4 BRC t = 150 x 240 cm Galvanis Ø 7mm Buah 750,000 465,000
5 BRC (tiang t = 120 ) Galvanis Buah 86,500 86,500
6 BRC (tiang t = 150 ) Galvanis Buah 118,800 118,800

FLOOR DECK / BONDEK


1 Floor Deck / Bondek t = 0.70 - 1000 mm M2 112,700 115,500
2 Floor Deck / Bondek t = 0.75 - 1000 mm M2 115,000 121,000
3 Floor Deck / Bondek t = 1.00 - 1000 mm M2 170,200 198,000

WIREMESH
1 Wiremesh M6 Uk. 2,1x5,4 Lembar 412,500 412,500
2 Wiremesh M7 Uk. 2,1x5,4 Lembar 522,500 522,500
3 Wiremesh M8 Uk. 2,1x5,4 Lembar 632,500 632,500
4 Wiremesh M10 Uk. 2,1x5,4 Lembar 962,500 962,500

HOLLOW
1 Hollow 40.40.4 Batang 33,000 33,000
2 Hollow 30.30.3 Batang 30,300 30,300
3 Hollow 20.40.4 Batang 27,500 27,500

KAWAT
1 Kawat beton/Bendrat Kg 20,000 20,000
2 Kawat Bronjong Galvanis Kg 14,300 16,000
3 Kawat duri (50 m) Rol 71,500 68,000
4 Kawat kasa besi M' 23,100 22,500
5 Bronjong fabrikasi 2,7 mm Unit/M3 300,000 300,000
6 Bronjong fabrikasi 3,4 mm Unit/M3 325,000 325,000

G BAHAN LANGIT - LANGIT


AKUSTIK
1 Langit-Langit Akustik 30X30 Lembar 5,500 5,500
2 Langit-Langit Akustik 30X60 Lembar 14,300 14,300
HARGA HARGA
SATUAN SATUAN
NO URAIAN SATUAN
SEMESTER 1 SEMESTER 2
Rp. Rp.

3 Langit-Langit Akustik 60X120 Lembar 44,000 44,000

SOFT BOARD
1 Gypsum Board Lembar 69,300 69,000

HARD BOARD
1 Kalsi Board Lembar 69,000 69,000

ETERNIT
1 Asbes Plat/ eternity 1,0 m x 1,0 m Lembar 17,100 17,000

PLAFOND PVC
1 Plafond PVC ex Shunda Plafond M2 280,000 280,000
HARGA HARGA
SATUAN SATUAN
NO URAIAN SATUAN
SEMESTER 1 SEMESTER 2
Rp. Rp.

LIST PROFIL
1 Lis Gipsum 12 cm M' 16,400 15,500
2 Lis Gipsum 7 cm M' 12,000 12,000
3 Lis Gipsum 9 cm M' 13,500 13,500
4 Lis kayu profil M' 6,800 7,250

H BAHAN FINSHING
CAT KAYU
1 Amril / amplas Lembar 3,000 3,000
2 Cat Kayu Kg 61,000 61,000
3 Cat Meni Kg 22,000 22,000
5 Dempul Plamur kayu Kg 16,600 27,250
6 Minyak cat/super tiner Liter 20,000 20,000
7 Plitur Liter 44,000 62,500
8 Coating batu alam Kg 70,000 65,000
9 Vernis Liter 45,500 45,500
11 Kuas cat 3 inchi Buah 7,000 7,000
12 Kuas cat 4 inchi Buah 15,000 15,000
13 Rol cat Buah 20,000 24,500

CAT TEMBOK
1 Cat Tembok interior ex. Catylac Kg 30,000 35,000
2 Cat Tembok exterior ex. Dulux Kg 80,000 110,000
3 Siler/Cat Dasar Tembok ex. Dulux Kg 44,000 75,000
4 Plamir tembok Kg 20,000 25,000
5 Cat Waterproof Kg 55,000 90,000

CAT BESI
1 Amplas Besi Lembar 5,000 5,000
2 Cat besi Kg 63,000 60,000
3 Cat brom Kg 65,000 75,000
4 Spiritus Liter 12,000 13,000

CAT EPOXY
1 Epoxy coating tebal 200 mikron M2 132,000 132,000
2 Epoxy coating tebal 300 mikron M2 165,000 165,000
3 Epoxy coating tebal 500 mikron M2 209,000 209,000
4 Epoxy coating tebal 1000 mikron M2 275,000 275,000

ALUMUNIUM COMPOSIT PANEL ( ACP )


1 ACP Coating PE (Indoor) Lembar 665,000 675,000
2 ACP Coating PVDF (Outdoor) Lembar 750,000 800,000

I BAHAN KACA
KACA POLOS / BENING
1 Kaca bening 3 mm M2 82,500 82,500
2 Kaca bening 5 mm M2 110,000 125,000
3 Kaca bening 10 mm M2 210,000 225,000

KACA RAYBAND
1 Kaca ryben 5 mm M2 99,000 100,000
HARGA HARGA
SATUAN SATUAN
NO URAIAN SATUAN
SEMESTER 1 SEMESTER 2
Rp. Rp.

LAIN-LAIN
1 Kaca Tempered 10 mm M2 410,000 425,000
2 Kaca Tempered 12 mm M2 650,000 650,000
4 Kaca es/dop M3 110,000 150,000
6 Kaca Cermin M2 250,000 235,000
7 Jendela Nako M' 15,000 17,500
HARGA HARGA
SATUAN SATUAN
NO URAIAN SATUAN
SEMESTER 1 SEMESTER 2
Rp. Rp.

J BAHAN PINTU DAN JENDELA


KUSEN ALUMUNIUM
1 Kusen aluminium 3" hitam 0.40 mm M' 75,000 75,000
2 Kusen aluminium 3" silver 0.40 mm M' 71,500 71,500
3 Kusen Alumunium 3" Urat Kayu Batang 1,020,000 1,020,000
4 Kusen Alumunium 3" Warna Powder Coating Batang 540,000 540,000
5 Kusen aluminium 4" coklat 0.40 mm M' 93,500 93,500
6 Kusen aluminium 4" silver 0.40 mm M' 118,000 118,000
7 Kusen aluminium 4" hitam 0.40 mm M' 120,000 120,000
8 Kusen aluminium 4" powder coating t= 4mm M' 120,000 120,000
9 Kusen Alumunium 4" Urat Kayu Batang 1,140,000 1,140,000
10 Kusen Alumunium 4" Warna Powder Coating Batang 630,000 630,000
11 Kusen Alumunium Setara Bosca Batang 1,320,000 1,320,000

KUSEN UPVC
1 Profil Rangka Jendela UPVC Putih Setara Bosca Batang 1,290,000 1,300,000
2 Profil Rangka Pintu UPVC Putih Setara Bosca Batang 1,896,000 1,900,000

K ALAT PENGUNCI DAN PENGGANTUNG


KUNCI TANAM
1 Kunci tanam 2x Slog (kecil) Buah 121,000 121,000
2 Kunci tanam 2x Slog Buah 152,000 152,000
3 Kunci tanam 2x Slog sekualitas Nanking Buah 64,100 64,000
5 Kunci Silinder Bh 152,000 152,000
6 Kunci Selot Bh 10,000 10,000
7 Kunci Lemari Bh 7,500 7,500

ENGSEL DAN GRENDEL


1 Engsel Kupu-kupu Buah 25,000 18,500
2 Engsel Angin Buah 16,000 26,000
3 Engsel Casement Set 55,000 45,000
4 Door Closer Bh 330,000 285,000
5 Door Stop Bh 45,000 45,000
6 Bottom Patch Fitting Set 500,000 500,000
7 Bottom /Top Lock Fitting Set 1,500,000 1,500,000
8 Flush Bolt Set 140,000 140,000
9 Fixed Top Pin Set 200,000 200,000
10 Floor Hinges Set 2,200,000 2,200,000
11 Handle Pintu Frameless Set 800,000 800,000
12 Handle / Pegangan pintu (kecil) Buah 75,000 97,000
13 Handle / Pegangan pintu (besar) Buah 160,000 149,000
14 Kait Angin Bh 12,500 36,500
15 Lever Handle pintu aluminium Set 55,000 55,000
18 Lockset Swing Door Set 220,000 220,000
19 Over panel pivot patch fitting Set 900,000 900,000
20 Over panel Set 1,300,000 1,300,000
21 Rambuncis Set 40,000 40,000
22 Top Patch Fitting Set 500,000 500,000
23 Grendel Biasa Buah 10,000 7,000
24 Reel pintu dorong ( Terpasang ) Buah 105,000 215,000
HARGA HARGA
SATUAN SATUAN
NO URAIAN SATUAN
SEMESTER 1 SEMESTER 2
Rp. Rp.

L BAHAN SANITAIR
1 Batchuip Bh 800,000 950,000
2 Bak Fibreglass Bh 300,000 350,000
3 Bak Cuci Piring Unit 250,000 280,000
4 Floor Drain Bh 71,500 60,000
5 Kloset duduk lengkap Buah 1,500,000 1,200,000
6 Kloset jongkok Buah 185,000 140,000
7 Urinoir Bh 375,000 400,000
8 Water drain Bh 60,000 60,000
9 Wastafel INA Bh 190,000 190,000
10 Fiberglass Septictank Bio Filter Kap. 2-4 Org Unit 5,258,000 5,521,000
11 Fiberglass Septictank Bio Filter Kap. 4-6Org Unit 6,600,000 6,930,000
12 Fiberglass Septictank Bio Filter Kap. 6-8 Org Unit 7,900,000 8,295,000
13 Fiberglass Septictank Bio Filter Kap. 8-10 Org Unit 10,800,000 11,340,000
14 Tangki Air Fiber 1100 Liter Buah 1,150,000 1,715,000
15 Tangki Air Fiber 2200 Liter Buah 6,367,000 6,500,000
16 Tangki Air Fiber 550 Liter Buah 690,000 1,005,000
17 Tangki Air Stainless 1000 Liter Buah 3,744,000 3,931,000
18 Tangki Air Stainless 2000 Liter Buah 6,367,000 6,685,000
19 Tangki Air Stainless 500 Liter Buah 1,776,000 1,865,000

M BAHAN PENGIKAT KAYU


1 Paku Kg 15,000 15,000
2 Paku asbes Kg 8,500 31,000
4 Paku kait lengkap Buah 3,200 3,000
5 Paku payung Kg 25,000 39,000
6 Paku Pancing Kg 16,500 16,500
7 Paku sekrup Kg 11,800 11,500
8 Tali Ijuk Kg 11,000 6,500
9 Lem kayu Kg 98,000 15,600
10 Lem kuning AICA AIBON Kg 47,700 38,000
11 Skrup Fisher Bh 1,000 1,000

N BAHAN LAIN-LAIN
1 Air M3 15,000.0 80,000
2 Air Ltr 15.0 80
3 Allumunium Foil / Sisalation M2 8,200 8,500
4 Allumunium Foil Super Woven Single M2 25,000 45,000
5 Folding gate 0.4 M² 555,000 550,000
6 Folding gate 0.8 M² 625,000 650,000
7 Formica Lembar 75,000 74,000
9 High Prssure Laminated (HPL) Uk. 244 x 122 cm Lembar 160,000 190,000
10 Minyak Oli/Pelumas Liter 30,000 30,000
17 Sandblasting Set 250,000 250,000
18 Sabun Kg 12,500 10,000
19 Sealer Tube 60,000 57,500
20 Soda Api Kg 11,000 18,000
21 Solar Liter 5,900 9,000
29 Woodplank 2/20 M' 16,200 17,500
30 Aspalt penetrasi 60/70 Kg 9,000 9,500
31 AC-BC Ton 1,183,200 1,263,000
32 AC-WC Ton 1,200,000 1,283,000
HARGA HARGA
SATUAN SATUAN
NO URAIAN SATUAN
SEMESTER 1 SEMESTER 2
Rp. Rp.

33 Aspalt Treated base (ATB) Ton 1,100,000 1,250,000


34 Hot roller sheet (HRS) Ton 1,320,000 1,386,000
35 Latasir Ton 1,430,000 1,448,000
36 LPA M3 320,000 330,000
37 LPB M3 310,000 316,000
38 Elastomer Buah 615,000 550,000
HARGA HARGA
SATUAN SATUAN
NO URAIAN SATUAN
SEMESTER 1 SEMESTER 2
Rp. Rp.

O BAHAN UNTUK TROTOAR DAN RTH


U-DITCH K 350
1 U-ditch / Yudit 40 x 40 x 120 = 60 mm Bh 504,000 489,500
2 U-ditch / Yudit 40 x 50 x 120 = 60 mm Bh 540,000 539,500
3 U-ditch / Yudit 40 x 60 x 120 = 60 mm Bh 660,000 585,000
4 U-ditch / Yudit 50 x 50 x 120 = 70 mm Bh 720,000 619,500
5 U-ditch / Yudit 50 x 60 x 120 = 70 mm Bh 774,000 668,500
6 U-ditch / Yudit 50 x 70 x 120 = 70 mm Bh 876,000 726,000
10 U-ditch / Yudit 60 x 60 x 120 = 70 mm Bh 892,000 751,000
11 U-ditch / Yudit 60 x 70 x 120 = 70 mm Bh 978,000 802,000
12 U-ditch / Yudit 60 x 80 x 120 = 70 mm Bh 1,062,000 901,000
13 U-ditch / Yudit 60 x 60 x 120 = 100 mm Bh 1,265,000 907,500
16 U-ditch / Yudit 80 x 80 x 120 = 80 mm Bh 1,265,000 1,122,000
17 U-ditch / Yudit 80 x 100 x 120 = 80 mm Bh 1,430,000 1,382,500
18 U-ditch / Yudit 80 x 80 x 120 = 100 mm Bh 1,320,000 1,235,000
19 U-ditch / Yudit 80 x 100 x 120 = 100 mm Bh 1,500,000 1,262,500
20 Cover U-ditch 400 x 120 = 100 mm Bh 236,500 312,000
21 Cover U-ditch 500 x 120 = 100 mm Bh 308,000 369,500
22 Cover U-ditch 600 x 120 = 100 mm Bh 822,000 414,500
24 T- 45 x 60 x 8 bh 138,000 181,500
25 T- 45 x 60 x10 bh 150,000 192,500
26 T- 45 x 60 x 12 bh 156,000 198,000
27 T- 55 x 60 x 8 bh 156,000 198,000
28 T- 55 x 60 x 10 bh 168,000 209,000
29 T- 55 x 60 x 12 bh 180,000 220,000
30 T- 65 x 60 x 8 bh 174,000 214,500
31 T- 65 x 60 x 10 bh 186,000 225,500
32 T- 65 x 60 x 12 bh 186,000 225,500
33 T- 76 x 60 x 8 bh 186,000 225,500
34 T- 76 x 60 x 10 bh 204,000 242,000
35 T-76 x 60 x 12 bh 216,000 253,000
36 T- 96x 60 x10 bh 246,000 280,500
37 T- 96x 60 x12 bh 264,000 297,000
38 T- 120 x 60 x 10 bh 306,000 335,500
39 T- 120 x 60 x 12 bh 330,000 357,500

P KHUSUS PINTU AIR


1 Pintu air jenis angkat B = 0,3 m; H=0,5 m; H1=0,65 m; mk=0,55 m; HTr=1,2 m unit 2,500,000 2,500,000
2 Pintu air jenis angkat B = 0,4 m; H=0,5 m; H1=0,95 m; mk=0,55 m; HTr=1,2 m unit 3,000,000 3,000,000
3 Pintu air jenis sosrong baja B = 0,6 m; H=0,8m; H1=1,2 m; mk=0,8 m; HTr=2,0 unit 10,800,000 10,800,000
4 Pintu air jenis sosrong baja B = 0,8 m; H= 1,0m; H1=1,2 m; mk=0,8 m; HTr=2,0 unit 11,750,000 11,750,000
5 Pintu air jenis sorong baja dengan roda gigi (stang tunggal) B = 1,0 m; H=1,0m unit 24,730,000 24,730,000
6 Pintu air jenis sorong baja dengan roda gigi (stang tunggal) B = 1,2 m; H=1,0m unit 25,700,000 25,700,000
7 Pintu air jenis sorong baja dengan roda gigi (stang ganda) B = 1,2 m; H=1,2 m; unit 43,650,000 43,650,000
8 Pintu air jenis sorong baja dengan roda gigi (stang ganda) B = 1,5 m; H=1,2 m unit 45,450,000 45,450,000
HARGA HARGA
SATUAN SATUAN
NO URAIAN SATUAN
SEMESTER 1 SEMESTER 2
Rp. Rp.

Q KHUSUS BETON READYMIX


1 Beton Ready Mix BO M3 840,000 840,000
2 Beton Ready Mix K- 50 M3 912,000 912,000
3 Beton Ready Mix K- 100 M3 930,000 930,000
4 Beton Ready Mix K- 125 M3 948,000 948,000
5 Beton Ready Mix K- 150 M3 972,000 972,000
6 Beton Ready Mix K- 175 M3 990,000 990,000
7 Beton Ready Mix K- 200 M3 1,008,000 1,008,000
8 Beton Ready Mix K- 225 M3 1,032,000 1,032,000
9 Beton Ready Mix K- 250 M3 1,050,000 1,050,000
10 Beton Ready Mix K- 275 M3 1,074,000 1,074,000
11 Beton Ready Mix K- 300 M3 1,104,000 1,104,000
12 Beton Ready Mix K- 325 M3 1,116,000 1,116,000
13 Beton Ready Mix K- 350 M3 1,134,000 1,134,000
14 Beton Ready Mix K- 375 M3 1,158,000
14 Beton Ready Mix K- 400 M3 1,182,000 1,182,000
15 Beton Ready Mix K- 425 M3 1,206,000
15 Beton Ready Mix K- 450 M3 1,236,000
16 Beton Ready Mix K- 475 M3 1,260,000
16 Beton Ready Mix K- 500 M3 1,290,000
18 Beton mutu Fc' 15 M3 956,000 990,000
19 Beton mutu Fc' 19 M3 1,000,000 1,029,000
20 Beton mutu Fc' 20 M3 1,032,000 1,053,000
21 Beton mutu Fc' 25 M3 1,086,000 1,128,000
22 Beton mutu Fc' 30 M3 1,160,000 1,206,000
Beton mutu Fc' 45 1,296,000

R BAHAN SARANA PRASARANA AIR BERSIH DAN PERPIPAAN


HARGA SATUAN PIPA.
1 PIPA PVC.SNI. S.10 SAMBUNGAN SC. Dd. / Dl.
DN. 6" M' 266,000 266,000
DN. 4" M' 125,000 125,000
DN. 3" M' 83,000 83,000
DN. 2" M' 41,000 41,000
DN. 1,5" M' 26,000 26,000
DN. 1" M' 14,000 14,000

2 PIPA PVC.SNI. S.10 SAMBUNGAN RR.


DN. 4" M' 127,000 127,000
DN. 3" M' 85,000 85,000
DN. 2" M' 42,000 42,000

3 PIPA PVC.SNI. S.12,5 SAMBUNGAN SC.


DN. 4" M' 82,000 82,000
DN. 3" M' 56,000 56,000
DN. 2" M' 27,000 27,000
DN. 1,5" M' 18,000 18,000

4 PIPA PVC.SNI. S.12,5 SAMBUNGAN RR.


DN. 4" M' 84,000 84,000
DN. 3" M' 57,000 57,000
DN. 2 M' 28,000 28,000
HARGA HARGA
SATUAN SATUAN
NO URAIAN SATUAN
SEMESTER 1 SEMESTER 2
Rp. Rp.

5 PIPA PVC.SNI. S.16 SAMBUNGAN SC.


DN. 4" M' 67,000 67,000
DN. 3" M' 46,000 46,000
DN. 2" M' 23,000 23,000

6 PIPA PVC.SNI. S.16 SAMBUNGAN RR. 4" M' 69,000 69,000


DN. 3" M' 46,000 46,000
DN. 2" M' 24,000 24,000
HARGA HARGA
SATUAN SATUAN
NO URAIAN SATUAN
SEMESTER 1 SEMESTER 2
Rp. Rp.

7 PIPA PVC. RUCIKA. AW SAMBUNGAN SC.


DN. 12" , p = 4 m M' 605,000 605,000
DN. 10" , p = 4 m M' 440,000 440,000
DN. 8" , p = 4 m M' 340,000 340,000
DN. 6" , p = 4 m M' 224,000 224,000
DN. 4" , p= 4 m M' 127,000 127,000
DN. 3" , p= 4 m M' 76,000 76,000
DN. 2,5" , p= 4 m M' 56,000 56,000
DN. 2" , p= 4 m M' 40,000 40,000
DN. 1,5" , p= 4 m M' 25,000 25,000
DN. 1 1/4" , p= 4 m M' 18,000 18,000
DN. 1" , p= 4 m M' 15,000 15,000
DN. 3/4" , p= 4 m M' 11,000 11,000
DN. 1/2" , p= 4 m M' 9,000 9,000

8 PIPA PE. SDR. 17 ( PN.10 )


DN. 3" M' 73,000 73,000
DN. 2,5" M' 51,000 51,000
DN. 2" M' 36,000 36,000
DN. 1,5" M' 23,000 23,000

9 PIPA PE. SDR. 13,6 ( PN.12,5 )


DN. 3" M' 88,000 88,000
DN. 2,5" M' 62,000 62,000
DN. 2" M' 44,000 44,000
DN. 1,5" M' 28,000 28,000

10 PIPA GALVANIS GI. SNI ( Medium.A )


DN. 8" p = 6m M' 554,000 554,000
DN. 6" p = 6m M' 298,000 298,000
DN. 4" p = 6m M' 202,000 202,000
DN. 3" p = 6m M' 138,000 138,000
DN. 2" p = 6m M' 95,000 95,000
DN. 1,5" M' 59,000 59,000
DN. 1" M' 39,000 39,000
DN. 3/4" M' 30,000 30,000
DN. 1/2" M' 28,000 28,000

11 PIPA GALVANIS MEDIUM B. SPINDO (G1 Kw.2)


DN. 6" M' 156,000 156,000
DN. 4" M' 110,000 110,000
DN. 3" M' 84,000 84,000
DN. 2" M' 64,000 64,000
DN. 1,5" M' 34,000 34,000
DN. 1" M' 31,000 31,000
DN. 3/4" M' 29,000 29,000
DN. 1/2" M' 24,000 24,000

12 PIPA STEELE SCHEDULE 40 DN.


DN. 6" M' 440,000 440,000
DN. 4" M' 276,000 276,000
DN. 3" M' 261,000 261,000
HARGA HARGA
SATUAN SATUAN
NO URAIAN SATUAN
SEMESTER 1 SEMESTER 2
Rp. Rp.
HARGA HARGA
SATUAN SATUAN
NO URAIAN SATUAN
SEMESTER 1 SEMESTER 2
Rp. Rp.

S ACCESSORIES PIPA
1 Air valve DN 1/2" Buah 153,000 153,000
7 Bend All Flange CI Dn. 2" - 90 o Buah 222,000 222,000
8 Bend All Flange CI Dn. 3" - 90 o Buah 499,000 499,000
9 Bend All Flange CI Dn. 4" - 45 o Buah 585,000 585,000
10 Bend All Flange CI Dn. 4" - 90 o Buah 585,000 585,000
11 Bend All Flange CI.Dn. 2" - 45 Buah 222,000 222,000
12 Bend All Flange CI.Dn. 3" - 45 o Buah 499,000 499,000
17 Bend PVC SC SNI DN 2"-45° Buah 28,000 28,000
18 Bend PVC SC SNI DN 2"-90° Buah 33,000 33,000
19 Bend PVC SNI RRJ DN 3"-90° Buah 110,000 110,000
20 Bend Socket Spigot PVC. SNI. DN. 2" - 45 o Buah 13,000 13,000
21 Bend Socket Spigot PVC. SNI. DN. 2" - 90 o
Buah 39,000 39,000
22 Bend Socket Spigot PVC. SNI. DN. 3" - 90 o
Buah 46,000 46,000
23 Bentonite Kg 10,000 10,000
24 Bok Meter Set. 44,000 44,000
25 Cap PVC SC DN 1 1/2" Buah 24,000 24,000
26 Cap PVC SC DN 1" Buah 9,000 9,000
27 Cap PVC SC DN 1/2" Buah 3,000 3,000
28 Chek Valve DN 1 1/2" Buah 92,800 92,500
29 Chek Valve DN 2" Buah 219,000 219,000
51 Knie GIP DN 1,5" Buah 28,000 28,000
52 Knie GI DN 1/2" Buah 9,000 9,000
53 Knie GI DN 2" Buah 40,000 40,000
54 Knie GIP DN 3/4" Buah 10,000 10,000
55 Knie PVC SC DN 1 1/2" Buah 9,000 9,000
56 Knie PVC SC DN 1" Buah 4,000 4,000
57 Knie PVC SC DN 1/2" Buah 3,000 3,000
58 Knie PVC SC DN 2" Buah 23,000 23,000
59 Kran air DN 1/2" (besi) Buah 28,000 28,000
60 Kran air DN 3/4" (Besi) Buah 33,000 33,000
77 Seal tape Buah 2,000 2,000
80 Shock ND 3/4" Buah 4,000 4,000
81 Stop Kran KITZ DN 1" Buah 61,000 61,000
82 Stop Kran KITZ DN 1 1/2" Buah 328,000 328,000
83 Stop Kran KITZ DN 2" Buah 575,000 575,000
84 Stop Kran KITZ DN 3/4" Buah 48,000 48,000
91 Tee All Flange CI. Dn. 2 x 2" Buah 11,000 11,000
92 Tee All Flange CI. Dn. 3 x 2" Buah 9,000 9,000
93 Tee All Flange CI. Dn. 3 x 3" Buah 6,000 6,000
94 Tee All Flange CI. Dn. 4 x 2" Buah 26,000 26,000
95 Tee All Flange CI. Dn. 4 x 3" Buah 40,000 40,000
96 Tee All Flange CI. Dn. 4 x 4" Buah 120,000 120,000
97 Tee All Flange DN 2 X 2" Buah 60,000 60,000
98 Tee Drat GIP DN 1 1/2 X 1 1/2" Buah 16,000 16,000
99 Tee Drat GIP DN 2 X 2" Buah 53,000 53,000
100 Tee PVC SC DN 1 1/2 x 1 1/2" Buah 13,000 13,000
101 Tee PVC SC DN 1 1/2 x 1" Buah 17,000 17,000
107 Valve Socket PVC DN 1 1/2" Buah 11,000 11,000
108 Valve Socket PVC DN 1" Buah 2,000 2,000
109 Valve Socket PVC DN 2" Buah 17,000 17,000
110 Valve Socket PVC DN 3" Buah 38,000 38,000
HARGA HARGA
SATUAN SATUAN
NO URAIAN SATUAN
SEMESTER 1 SEMESTER 2
Rp. Rp.

126 Water Meter All Flane DN 3" Buah 1,652,000 1,652,000


127 Water Meter All Flnge DN 2" Buah 1,226,000 1,226,000
128 Water Meter DN 1 1/2" Buah 1,100,000 1,100,000
129 Water Meter DN 1" Buah 545,000 545,000
130 Water Meter DN 3/4" Buah 358,000 358,000
131 Water Moor DN 1,5" Buah 41,000 41,000
132 Water Moor DN 2" Buah 59,000 59,000
133 Water Moor DN 3/4" Buah 15,000 15,000
HARGA HARGA
SATUAN SATUAN
NO URAIAN SATUAN
SEMESTER 1 SEMESTER 2
Rp. Rp.

T PENGEBORAN
1 Centraliser Bh 200,000 200,000
2 Depresiasi alat redeplopping unit 2,391,000 2,391,000
3 Depresiasi mixer unit 120,000 120,000
4 Depresiasi Peralatan logging unit 962,000 962,000
5 Depresiasi Peralatan mesin unit 722,000 722,000
6 Depresiasi Peralatan pengeboran unit 1,082,000 1,082,000
7 Depresiasi Pompa injeksi unit 481,000 481,000
8 Grevel M3 276,000 276,000
9 Kawat Las. RB. 26 kg 25,000 25,000
10 Kawat Las. RB. 32 kg 23,000 23,000
11 Liquid Oil Grundfose liter 290,000 290,000
12 Panel Pompa Unit 5,216,000 5,216,000
13 Tiang Kabel bh 841,000 841,000

U POMPA AIR UNTUK PENYEDIAAN AIR BERSIH


POMPA SUBMERSIBLE MOTOR CELUP
SETARA GRUNDFOS, RITCH.LOARA DLL
1 MOTOR POMPA 1 PHASE./ 1 X 220 Tot.head
Kapasitas 3 m3/jam 52 m unit 17,791,500 18,681,000
Kapasitas 3 m3/jam 61 m unit 20,084,000 21,088,000
Kapasitas 3 m3/jam 78 m unit 20,688,000 21,722,000
Kapasitas 3 m3/jam 96 m unit 23,104,000 24,259,000
Kapasitas 3 m3/jam 108 m unit 23,735,500 24,922,000
Kapasitas 3 m3/jam 128.m unit 37,738,000 39,625,000
Kapasitas 3 m3/jam 144.m unit 39,454,000 41,427,000

2 MOTOR POMPA 1 PHASE./ 1 X 220 Head.


Kapasitas 17 m3/jam 23 m' unit 29,490,000 30,965,000
Kapasitas 17 m3/jam 31 m' unit 29,137,000 30,594,000

3 MOTOR POMPA 3 PHASE./ 3 X 380 Tot.head


Kapasitas 3 m3/jam 52 m' unit 17,962,000 18,860,000
Kapasitas 3 m3/jam 61 m' unit 20,277,000 21,291,000
Kapasitas 3 m3/jam 78 m' unit 20,887,000 21,931,000
Kapasitas 3 m3/jam 96m' unit 23,326,000 24,492,000
Kapasitas 3 m3/jam 108m' unit 23,964,000 25,162,000
Kapasitas 3 m3/jam 128 m' unit 38,101,000 40,006,000

4 MOTOR POMPA 3 PHASE./ 3 X 380 Tot.head


Kapasitas 14 m3/jam 46 m' unit 32,465,000 34,088,000
Kapasitas 14 m3/jam 60 m' unit 47,617,000 49,998,000
Kapasitas 14 m3/jam 100 m' unit 64,653,000 67,886,000
Kapasitas 14 m3/jam 115 m' unit 64,653,000 67,886,000

5 MOTOR POMPA 3 PHASE./ 3 X 380 Tot.head


Kapasitas 17 m3/jam 48 m unit 43,307,000 45,472,000
Kapasitas 17 m3/jam 55 m unit 47,968,000 50,366,000
Kapasitas 17 m3/jam 65 m unit 49,916,000 52,412,000
Kapasitas 17 m3/jam 72 m' unit 51,951,000 54,549,000
Kapasitas 17 m3/jam 79 m' unit 66,399,000 69,719,000
Kapasitas 17 m3/jam 89 m' unit 68,309,000 71,724,000
Kapasitas 17 m3/jam 96 m' unit 68,309,000 71,724,000
HARGA HARGA
SATUAN SATUAN
NO URAIAN SATUAN
SEMESTER 1 SEMESTER 2
Rp. Rp.

6 MOTOR POMPA 3 PHASE./ 3 X 400 Tot.head


Kapasitas 5 m3/jam 48 m' unit 17,602,000 18,482,000
Kapasitas 5 m3/jam 67 m' unit 19,805,000 20,795,000
Kapasitas 5 m3/jam 85 m' unit 22,523,000 23,649,000
Kapasitas 5 m3/jam 100 m' unit 23,410,000 24,581,000
Kapasitas 5 m3/jam 130 m' unit 30,575,000 32,104,000
Kapasitas 5 m3/jam 155 m' unit 55,787,000 58,576,000
Kapasitas 5 m3/jam 173 m' unit 58,392,000 61,312,000
Kapasitas 5 m3/jam 210 m' unit 73,818,000 77,509,000
HARGA HARGA
SATUAN SATUAN
NO URAIAN SATUAN
SEMESTER 1 SEMESTER 2
Rp. Rp.

7 MOTOR POMPA 3 PHASE./ 3 X 400 Tot.head


Kapasitas 8 m3/jam 41 m' unit 22,897,000 24,042,000
Kapasitas 8 m3/jam 62 m' unit 26,528,000 27,854,000
Kapasitas 8 m3/jam 63 m' unit 30,603,000 32,133,000
Kapasitas 8 m3/jam 75 m' unit 40,485,000 42,509,000
Kapasitas 8 m3/jam 90 m' unit 45,405,000 47,675,000

V BAHAN DAN ALAT LISTRIK


1 Amature Lengkap Non LED SON-T 70 watt unit 1,100,000 2,250,000
2 Amature Lengkap Non LED SON-T 150 watt unit 2,310,000 2,400,000
3 Amature Lengkap Non LED SON-T 250 watt unit 2,475,000 2,750,000
4 Amature LED 34 /NW 27 W unit 1,705,000 1,705,000
5 Amature LED 56/NW 55 W unit 5,335,000 5,335,000
6 Amature LED 93/ NW 90 W unit 6,160,000 6,160,000
7 Amature LED 131/NW 120 W unit 6,985,000 6,985,000
8 Amature LED 159/NW 150 W unit 8,140,000 8,140,000
9 Amature LED 206/NW 200 W unit 4,520,000 4,520,000
10 Amature LED street light 10 W unit 920,000 920,000
11 Amature LED street light 20 W (tunggal ) unit 1,110,000 1,110,000
12 Amature LED street light 20 W (lampu ganda) unit 2,355,000 2,355,000
13 Amature LED street light 40 W unit 2,772,000 2,772,000
14 Amature LED street light 60 W unit 2,385,000 2,385,000
15 Amature LED street light 80 W unit 4,435,000 4,435,000
16 Amature LED street light 90 W unit 4,700,000 4,700,000
17 Amature LED street light 120 W unit 5,280,000 5,280,000
18 Amature LED street light 200 W unit 6,505,000 6,505,000
19 Amature LED street light 30 W multichip unit 2,710,000 2,710,000
20 Amature LED street light 40 W multichip unit 3,710,000 3,710,000
21 Amature LED street light 60 W multichip unit 5,530,000 5,530,000
22 Amature LED street light 90 W multichip unit 6,100,000 6,100,000
23 Amature LED street light 120 W multichip unit 7,230,000 7,230,000
24 Amature LED street light 200 W multichip unit 7,940,000 7,940,000
25 Amature Aurora FLS 70 W unit 2,400,000 2,400,000
26 Amature Aurora FLS-T 150 W unit 2,500,000 2,500,000
27 Amature Spark FLS 70 W unit 2,350,000 2,350,000
28 Amature Spark FLS-T 250 W unit 2,800,000 2,800,000
29 Amature Camar FLS-T 150 W dimming 150W/100W unit 4,150,000 4,150,000
30 Amature Camar FLS-T 250 W dimming 250W/150W unit 4,750,000 4,750,000
31 Amature Camar FLS-T 400 W dimming 400W/250W unit 5,100,000 5,100,000
32 Amature Opera FLS-T 150 W dimming 150W/100W unit 4,300,000 4,300,000
33 Amature Opera FLS-T 250 W dimming 250W/150W unit 4,650,000 4,650,000
34 Amature Opera FLS-T 400 W dimming 400W/250W unit 4,950,000 4,950,000
35 Amature Panorama FLS-T 150 W dimming 150W/100W unit 4,070,000 4,070,000
36 Amature Panorama FLS-T 250 W dimming 250W/150W unit 4,350,000 4,350,000
37 Amature Panorama FLS-T 400 W dimming 400W/250W unit 4,810,000 4,810,000
38 Amature Star FLS-T 150 W dimming 150W/100W unit 3,900,000 3,900,000
39 Amature Star FLS-T 250 W dimming 250W/150W unit 4,370,000 4,370,000
40 Amature Star FLS-T 400 W dimming 400W/250W unit 4,800,000 4,800,000
41 Amature Mars FLM-T 150 W unit 3,985,000 3,985,000
42 Amature Samba FLM-T 250 W unit 2,600,000 2,600,000
43 Amature Samba FLM-T 400 W unit 2,980,000 2,980,000
44 Amature Samba FLS-T 400 W unit 2,880,000 2,880,000
HARGA HARGA
SATUAN SATUAN
NO URAIAN SATUAN
SEMESTER 1 SEMESTER 2
Rp. Rp.

56 Amature LED Opera M 60 W unit 7,284,000 7,284,000


57 Amature LED Opera M 90 W unit 9,240,000 9,240,000
58 Amature LED Opera M 120 W unit 9,976,000 9,976,000
59 Angkur, Mur dan Ring Galvanized Ø 19 mm' Buah 50,000 50,000
60 Angkur, Mur dan Ring Galvanized Ø 22 mm' Buah 60,000 60,000
61 Angkur, Mur dan Ring Galvanized Ø 25 mm' Buah 220,000 220,000
62 Ayenat Buah 22,000 22,000
63 Begel 27-28 set 115,500 115,500
64 Begel 28-29 set 137,500 137,500
HARGA HARGA
SATUAN SATUAN
NO URAIAN SATUAN
SEMESTER 1 SEMESTER 2
Rp. Rp.

65 Box Panel, Uk 70x55x35 cm, t = 1,2 mm Buah 920,000 920,000


66 Box Panel, Uk 70x45x25 cm, t = 1,2 mm Buah 870,000 870,000
67 Box Panel, Uk 60x40x25 cm, t = 1,2 mm Buah 770,000 770,000
68 Box Panel, Uk 55x30x25 cm, t = 1,2 mm Buah 670,000 670,000
69 Box Panel, Uk 70x55x35 cm, t = 1,5 mm Buah 1,000,000 1,000,000
70 Box Panel, Uk 70x45x25 cm, t = 1,5 mm Buah 950,000 950,000
71 Box Panel, Uk 60x40x25 cm, t = 1,5 mm Buah 850,000 850,000
72 Box Panel, Uk 55x30x25 cm, t = 1,5 mm Buah 750,000 750,000
73 Box Travo , uk 15x20x10 plat 1,2 mm Buah 85,000 85,000
74 Conector Kabel Buah 34,400 34,400
75 Fiitting gantung 125/80/70 watt Buah 25,000 25,000
76 Fiitting gantung 250/150 watt Buah 25,500 25,500
77 Fiitting Keramik 125/80/70 watt Buah 19,000 19,000
78 Fiitting Keramik 250/150 watt Buah 23,000 23,000
79 Ground Rod 5/8 inch, panjang 2 meter Batang 63,500 63,500
80 Ignitor ( 70 - 250 W ) Buah 58,000 58,000
81 Isolasi nachi tanggung Buah 10,000 10,000
82 Isolasi 3M besar Buah 46,000 46,000
83 Kabel BC 1 x 6 mm² m' 8,500 8,500
84 Kabel DX 2 x 10 mm, m' 8,700 8,700
85 Kabel DX 2 x 16 mm m' 8,800 8,800
86 Kabel NYM 2 x 1,5 mm m' 9,800 9,800
87 Kabel NYM 3 x 1,5 mm m' 9,800 9,800
88 Kabel NYM 2 x 2,5 mm m' 15,000 15,000
89 Kabel NYM 3 x 2,5 mm m' 20,000 20,000
90 Kabel NYM 4 x 2,5 mm m' 25,000 25,000
91 Kabel NYA 1 x 1,5 mm m' 5,000 5,000
96 Lampu HPS-T 70 W Unit 110,000 110,000
97 Lampu HPS-T 150 W Unit 125,000 170,000
98 Lampu HPS-T 250 W Unit 150,000 250,000
103 MCB 4 A Buah 60,500 60,500
104 MCB 6 A Buah 52,500 60,000
105 MCB 10 A Buah 55,000 60,000
106 MCB 16 A Buah 60,000 60,000
107 MCB 20 A Buah 66,000 66,000
108 MCB 25 A Buah 67,000 67,000
109 MCB 32 A Buah 72,000 72,000
111 Obeng ( - ) Buah 33,000 33,000
112 Obeng ( + ) Buah 33,000 33,000
113 Photocell 3 A Buah 98,000 98,000
114 Photocell 6 A Buah 115,000 115,000
115 Photocell 10 A Buah 138,100 138,100
116 Stang medium pipa 2,5 galvanis tebal 2,5 mm p= 1,5 m unit 585,000 585,000
117 Stang medium pipa 2,5 galvanis tebal 2,5 mm p= 2 m unit 750,000 750,000
118 Stang medium pipa 2,5 galvanis tebal 2,5 mm p= 3 m unit 900,000 900,000
119 Stang medium pipa 2,5 galvanis tebal 2,5 mm p= 4 m unit 985,000 985,000
120 Stang medium pipa 2,5 galvanis tebal 2,5 mm p= 6 m unit 1,150,000 1,150,000
121 Stang medium pipa 1,5 galvanis tebal 2,5 mm p= 1,5 m unit 425,000 500,000
122 Stang medium pipa 1,5 galvanis tebal 2,5 mm p= 2 m unit 610,000 650,000
123 Stang medium pipa 1,5 galvanis tebal 2,5 mm p= 3 m unit 730,000 800,000
124 Stang medium pipa 1,5 galvanis tebal 2,5 mm p= 4 m unit 985,000 985,000
125 Stang medium pipa 1,5 galvanis tebal 2,5 mm p= 6 m unit 1,025,000 1,025,000
HARGA HARGA
SATUAN SATUAN
NO URAIAN SATUAN
SEMESTER 1 SEMESTER 2
Rp. Rp.

126 Stang medium pipa 2 galvanis tebal 2,5 mm p= 1,5 m unit 465,000 525,000
127 Stang medium pipa 2 galvanis tebal 2,5 mm p= 2 m unit 580,000 675,000
128 Stang medium pipa 2 galvanis tebal 2,5 mm p= 3 m unit 70,000 825,000
129 Stang medium pipa 2 galvanis tebal 2,5 mm p= 4 m unit 825,000 925,000
130 Stang medium pipa 2 galvanis tebal 2,5 mm p= 6 m unit 930,000 975,000
131 Stang octagonal galvanis tebal 3,2 mm p = 1,5 m unit 850,000 850,000
132 Stang octagonal galvanis tebal 3,2 mm p = 2 m unit 1,055,000 1,055,000
133 Stang octagonal galvanis tebal 3,2 mm p = 3 m unit 1,235,000 1,235,000
134 Stang octagonal galvanis tebal 3,2 mm p = 4 m unit 1,455,000 1,455,000
135 Stang octagonal galvanis tebal 3,2 mm p =6 m unit 1,700,000 1,700,000
136 Strain Clamp Wedge Buah 18,000 18,000
137 T Dos Buah 5,400 10,750
139 Testpen Buah 16,500 16,500
HARGA HARGA
SATUAN SATUAN
NO URAIAN SATUAN
SEMESTER 1 SEMESTER 2
Rp. Rp.

142 Trafo BSN 150 W Buah 322,000 322,000


143 Trafo BSN 250 W Buah 261,000 261,000
144 Trafo FBS 70 W Buah 290,000 290,000
145 Trafo FBS 150 W Buah 400,000 400,000
146 Klem kabel 07 dos 6,100 10,500
147 Klem kabel 08 dos 6,500 12,000
148 Klem kabel 09 dos 7,200 12,500
149 Klem kabel10 dos 7,700 15,000
150 Klem kabel 12 dos 8,300 17,500
151 Klem kabel 17 dos 16,500 25,000
152 Klem kabel 19 dos 24,800 35,000
153 Kabel ties ukuran 10 cm Buah 8,800 15,000
154 Kabel ties ukuran 15 cm Buah 17,100 17,100
155 Kabel ties ukuran 25 cm Buah 34,100 34,100
156 Kabel ties ukuran 30 cm Buah 39,100 39,100
157 Kabel ties ukuran 37 cm Buah 45,100 45,100
158 Lampu LED 3 watt Buah 29,700 29,700
159 Lampu LED 4 watt Buah 36,300 36,300
160 Lampu LED 6 watt Buah 38,500 38,500
161 Lampu LED 7 watt Buah 56,100 56,100
162 Lampu Selang LED bulat selain worm white m' 23,700 35,000
167 Tiang octagonal galvanis type parabola cabang 1 tinggi 6m (medium A) Unit 4,150,000 4,500,000
168 Tiang octagonal galvanis type parabola cabang 1 tinggi 7m (medium A) Unit 4,510,000 5,500,000
170 Tiang octagonal galvanis type parabola cabang 1 tinggi 9m (medium A) Unit 5,470,000 6,500,000
172 Tiang octagonal galvanis type parabola cabang 1 tinggi 11m (medium A) Unit 7,815,000 8,500,000
175 Tiang octagonal galvanis type parabola cabang 1 tinggi 14m (medium A) Unit 10,490,000 10,500,000
176 Tiang octagonal galvanis type parabola cabang 2 tinggi 6m (medium A) Unit 4,928,000 5,500,000
177 Tiang octagonal galvanis type parabola cabang 2 tinggi 7m (medium A) Unit 5,514,000 6,500,000
179 Tiang octagonal galvanis type parabola cabang 2 tinggi 9m (medium A) Unit 6,471,000 7,500,000
181 Tiang octagonal galvanis type parabola cabang 2 tinggi 11m (medium A) Unit 8,735,000 9,500,000
184 Tiang octagonal galvanis type parabola cabang 2 tinggi 14m (medium A) Unit 12,913,000 12,913,000
185 Tiang polos galvanis type parabola cabang 1 tinggi 6m (medium A) Unit 3,050,000 3,500,000
186 Tiang polos galvanis type parabola cabang 1 tinggi 7m (medium A) Unit 3,290,000 4,500,000
188 Tiang polos galvanis type parabola cabang 1 tinggi 9m (medium A) Unit 3,987,000 5,500,000
190 Tiang polos galvanis type parabola cabang 1 tinggi 11m (medium A) Unit 5,695,000 7,500,000
193 Tiang polos galvanis type parabola cabang 1 tinggi 14m (medium A) Unit 7,640,000 9,500,000
194 Tiang polos galvanis type parabola cabang 2 tinggi 6m (medium A) Unit 3,597,000 4,500,000
195 Tiang polosl galvanis type parabola cabang 2 tinggi 7m (medium A) Unit 4,050,000 5,500,000
197 Tiang polos galvanis type parabola cabang 2 tinggi 9m (medium A) Unit 4,730,000 6,500,000
199 Tiang polos galvanis type parabola cabang 2 tinggi 11m (medium A) Unit 6,366,000 8,500,000
202 Tiang polos galvanis type parabola cabang 2 tinggi 14m (medium A) Unit 9,400,000 10,500,000
211 Saklar Tunggal Buah 15,000 21,000
212 Saklar Ganda Buah 20,000 23,500
213 Stop Kontak Buah 17,500 21,000
HARGA HARGA
SATUAN SATUAN
NO URAIAN SATUAN
SEMESTER 1 SEMESTER 2
Rp. Rp.

AB SEWA PERALATAN KAPASITAS


1 ASPHALT MIXING PLANT 50 T/Jam Jam 575,500 575,000
2 ASPHALT FINISHER 5 Ton Jam 199,900 199,000
3 ASPHALT SPRAYER 200 Liter Jam 57,100 57,000
4 BULLDOZER 100-150 HP - Jam 445,200 445,000
5 COMPRESSOR 4000-6500 L\M - Jam 200,000 200,000
6 CONCRETE MIXER 0.3-0.6 M3 250 Liter Jam 57,900 57,000
7 CRANE 10-15 TON 15 Ton Jam 405,400 405,000
8 DUMP TRUCK 3-4 M3 4 Ton Jam 242,900 242,000
9 DUMP TRUCK 12 Ton Jam 325,600 325,000
10 EXCAVATOR 80-140 HP 1 M3 Jam 312,300 312,000
11 FLAT BED TRUCK 3-4 M3 4 M3 Jam 297,200 297,000
12 GENERATOR SET 180 KVA Jam 536,000 536,000
13 MOTOR GRADER >100 HP - Jam 429,900 429,000
14 TRACK LOADER 75-100 HP 2 M3 Jam 344,100 344,000
15 WHEEL LOADER 1.0-1.6 M3 1 M3 Jam 434,400 434,000
16 THREE WHEEL ROLLER 6-8 T 8 Ton Jam 186,300 186,000
17 TANDEM ROLLER 6-8 T. 8 Ton Jam 211,400 211,000
18 TIRE ROLLER 8-10 T. 10 Ton Jam 272,700 272,000
19 VIBRATORY ROLLER 5-8 T. 8 Ton Jam 240,000 240,000
20 CONCRETE VIBRATOR - Jam 24,400 24,000
21 STONE CRUSHER 50 T/Jam Jam 747,300 747,000
22 WATER PUMP 70-100 mm - Jam 33,300 33,000
23 WATER TANKER 3000-4500 L. 4,000 Liter Jam 292,700 292,000
24 PEDESTRIAN ROLLER / BABY ROLLER 1 Ton Jam 52,300 52,000
25 TAMPER 1 Ton Jam 31,400 31,000
26 JACK HAMMER - Jam 48,800 48,000
27 FULVI MIXER - Jam 176,000 176,000
28 CONCRETE PUMP 40 M3 Jam 263,600 263,000
29 TRAILER 20 TON 20 Ton Jam 338,600 338,000
30 PILE DRIVER + HAMMER 3 Ton Jam 72,100 72,000
31 CRANE ON TRACK 35 TON 35 Ton Jam 394,000 394,000
32 WELDING SET 230 Amp Jam 87,300 87,000
33 BORE PILE MACHINE 2,000 Meter Jam 1,647,800 1,647,000
34 ASPHALT LIQUID MIXER 1,000 Liter Jam 28,200 28,000
35 TRAILLER 15 TON 15 Ton Jam 281,500 281,000
36 ROCK DRILL BREAKER - - Jam 350,900 350,000
37 COLD MILLING - - Jam 43,500 43,000
38 GEO LISTRIK Hari 2,500,000 2,500,000
39 BOREHOLE Meter 822,300 822,000
40 TEMPORARY CASSING (ID) Meter 464,200 464,000
41 DRILLING RIG +PERLENGKAPAN (PEMASANGAN PIPA) Meter 834,200 834,000
42 DRILLING RIG +PERLENGKAPAN (PENCUCIAN SUMUR) M3 746,500 746,000
43 DRILLING RIG +PERLENGKAPAN (UJI PEMPOMPAAN) M3 242,300 242,000
44 Sewa Tripot/Tackel & Handle crane 2T Unit 160,000 160,000

Ungaran, 2018
KEPALA DINAS PEKERJAAN UMUM
KABUPATEN SEMARANG
HARGA HARGA
SATUAN SATUAN
NO URAIAN SATUAN
SEMESTER 1 SEMESTER 2
Rp. Rp.

Ir. TOTIT OKTORIYANTO, MM


Pembina Utama Muda
NIP. 19621027 199002 1 002
HARGA SATUAN UPAH, BAHAN DAN PERALATAN
PEKERJAAN UMUM KABUPATEN SEMARANG
TAHUN 2018 SEMESTER 2

KETERANGAN

6
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
PERHITUNGAN VOLUME
GAMBAR / SKETSA / DETAIL BANGUNAN / PEKERJAAN

PERHITUNGAN

1 Pemasangan 1 m3 Pondasi Batu Belah Campuran 1SP : 4 PP 1.00 m3 x 1,029,037.25 = 1,029,037.25


Panjangx Lebar x Tinggi
1x 0.5 x 0.5 = 0.25 m3 Bawah
1x 0.4 x 1.5 = 0.6 m3 Atas
= 0.85 m3 per 1 meter lari
Panjang per m3 = 1/ 0.85 = 1.176 m'

2 Pemasangan 1 m2 Finishing Siar Pas.Batu Kali Campuran 1Pc : 2Pp


1.176 x 1.5 1.76 m2 x 53,300.49 = 94,059.68

3 Pemasangan 1 m2 Plesteran 1 Pc : 5 Pp Tebal 15 mm


1.176 x 0.35 0.41 m2 x 57,294.50 = 23,591.85

4 Pemasangan 1 m2 Acian 0.41 m2 x 54,165.00 = 22,303.24

5 Suling-Suling dia 2"


0.45 m' x 2 0.90 m' x 77,940.68 = 70,146.61

HARGA PASANGAN BATU BELAH 1:4 PER M3 JADI = 1,239,138.63


PERHITUNGAN VOLUME
GAMBAR / SKETSA / DETAIL BANGUNAN / PEKERJAAN

PERHITUNGAN

1 Pemasangan 1 m3 Pondasi Batu Belah Campuran 1SP : 4 PP 1.00 m3 x 1,029,037.25 = 1,029,037.25


Panjangx Lebar x Tinggi
1x 0.4 x 0.3 = 0.12 m3 Bawah
1x 0.35 x 0.7 = 0.245 m3 Atas
= 0.365 m3 per 1 meter lari
Panjang per m3 = 1/ 0.365 = 2.74 m'

2 Pemasangan 1 m2 Finishing Siar Pas.Batu Kali Campuran 1Pc : 2Pp


2.74 x 1.5 4.11 m2 x 53,300.49 = 219,043.10

3 Pemasangan 1 m2 Plesteran 1 Pc : 5 Pp Tebal 15 mm


2.74 x 0.35 0.96 m2 x 57,294.50 = 54,939.93

4 Pemasangan 1 m2 Acian 0.96 m2 x 54,165.00 = 51,939.04

5 Suling-Suling dia 2"


0.375 m' x 1 0.38 m' x 77,940.68 = 29,227.75

HARGA PASANGAN BATU BELAH 1:4 PER M3 JADI = 1,384,187.07


PERHITUNGAN VOLUME
GAMBAR / SKETSA / DETAIL BANGUNAN / PEKERJAAN

PERHITUNGAN

1 Kaca Tempered 12 mm 4 m2 x 758,939.63 = 3,035,758.50


2 Floor Hinges 2 bh x 2,332,631.25 = 4,665,262.50
3 Overpanel 2 bh x 1,367,752.50 = 2,735,505.00
4 Top Patch Fitting 2 bh x 539,752.50 = 1,079,505.00
5 Bottom Patch Fitting 2 bh x 539,752.50 = 1,079,505.00
6 Bottom Patch Lock + Cilinder 2 bh x 1,574,752.50 = 3,149,505.00
7 Pull Handle 2 bh x 850,252.50 = 1,700,505.00

= 17,445,546.00
PERHITUNGAN HARGA SATUAN PEKERJAAN (HSP)

A. 2.2.1.12. Pembongkaran 1 m3 Beton Bertulang 1,109,750.00

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.02 OH 11.000 75,000.00 825,000.00
Mandor L.04 OH 1.400 100,000.00 140,000.00
JUMLAH TENAGA KERJA 965,000.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah A + B + C 965,000.00
E Overhead & Profit 15% x D 144,750.00
F Harga Satuan Pekerjaan (D+E) 1,109,750.00

A. 2.2.1.13. Pembongkaran 1 m3 Pondasi 855,082.50

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.02 OH 9.190 75,000.00 689,250.00
Mandor L.03 OH 0.603 90,000.00 54,300.00
JUMLAH TENAGA KERJA 743,550.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah A + B + C 743,550.00
E Overhead & Profit 15% x D 111,532.50
F Harga Satuan Pekerjaan (D+E) 855,082.50
A. 2.2.1.14. Pembongkaran m3 Kansten 607,579.50

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A Tenaga
Pekerja L.02 OH 7.000 75,000.00 525,000.00
Mandor L.04 OH 0.033 100,000.00 3,330.00
JUMLAH TENAGA KERJA 528,330.00
B Bahan

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah A + B + C 528,330.00
E Overhead & Profit 15% x D 79,249.50
F Harga Satuan Pekerjaan (D+E) 607,579.50

A. 2.2.1.15 Pembongkaran1 m3 Rabat Beton 1,019,820.00


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 9.460 75,000.00 709,500.00
Kepala Tukang L.03 OH 0.940 95,000.00 89,300.00
Mandor L.04 OH 0.880 100,000.00 88,000.00
JUMLAH TENAGA KERJA 886,800.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 886,800.00
E Overhead & Profit 15% x D 133,020.00
F Harga Satuan Pekerjaan (D+E) 1,019,820.00
A. 2.3.1.HARGA SATUAN PEKERJAAN TANAH
A. 2.3.1.1. Penggalian 1 m3 Tanah Biasa Sedalam 1 m 70,495.00

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.784 75,000.00 58,800.00
Mandor L.04 OH 0.025 100,000.00 2,500.00
JUMLAH TENAGA KERJA 61,300.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 61,300.00
E Overhead & Profit 15% x D 9,195.00
F Harga Satuan Pekerjaan (D+E) 70,495.00

A. 2.3.1.11. Pengurugan 1 m3 Pasir dengan Pasir Urug 384,962.50

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.450 75,000.00 33,750.00
Mandor L.04 OH 0.010 100,000.00 1,000.00
JUMLAH TENAGA KERJA 34,750.00
B BAHAN
Pasir Urug m3 1.200 250,000.00 300,000.00
JUMLAH HARGA BAHAN 300,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 334,750.00
E Overhead & Profit 15% x D 50,212.50
F Harga Satuan Pekerjaan (D+E) 384,962.50

A. 2.3.1.15. Pengurugan 1 m3 Tanah Urug 115,143.75

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA 19,125.00
Pekerja L.01 OH 0.250 67,500.00 16,875.00
Mandor L.04 OH 0.025 90,000.00 2,250.00
JUMLAH TENAGA KERJA 19,125.00
B BAHAN 81,000.00
JUMLAH HARGA BAHAN 81,000.00
Tanah Urug m3 1.200 67,500.00 81,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 100,125.00
E Overhead & Profit 15% x D 15,018.75
F Harga Satuan Pekerjaan (D+E) 115,143.75
A. 3.2.1.HARGA SATUAN PEKERJAAN PONDASI
A. 3.2.1.1. Pemasangan 1 m3 Pondasi Batu Belah Campuran 1 SP : 3PP 1,212,243.75

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 1.820 75,000.00 136,500.00
Tukang Batu L.02 OH 0.800 90,000.00 72,000.00
Kepala Tukang L.03 OH 0.075 95,000.00 7,125.00
Mandor L.04 OH 0.075 100,000.00 7,500.00
JUMLAH TENAGA KERJA 223,125.00
B BAHAN
Batu Belah 15/20 m3 1.200 360,000.00 432,000.00
Semen Kg 202.000 1,375.00 277,750.00
Pasir Pasang m3 0.485 250,000.00 121,250.00
JUMLAH HARGA BAHAN 831,000.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah A + B + C 1,054,125.00
E Overhead & Profit 15% x D 158,118.75
F Harga Satuan Pekerjaan (D+E) 1,212,243.75
A 4.1.1.HARGA SATUAN PEKERJAAN BETON
A 4.1.1.1 Membuat 1 m3 Beton mutu f'c=7,4 Mpa (K100), slum (12±2)cm, w/c = 0,87 1,136,943.80

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 2.900 75,000.00 217,500.00
Tukang Batu L.02 OH 0.340 90,000.00 30,600.00
Kepala Tukang L.03 OH 0.032 95,000.00 3,040.00
Mandor L.04 OH 0.090 100,000.00 9,000.00
JUMLAH TENAGA KERJA 260,140.00
B BAHAN
Semen Kg 247.000 1,137.50 280,962.50
Pasir Beton Kg 869.000 244.29 212,284.29
Kerikil (maksimum 30 mm) Kg 999.000 220.00 219,780.00
Air ltr 215.000 72.00 15,480.00
JUMLAH HARGA BAHAN 728,506.79
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 988,646.79
E Overhead & Profit 15% x D 148,297.02
F Harga Satuan Pekerjaan (D+E) 1,136,943.80

A 4.1.1.7 Membuat 1 m3 Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 1,491,945.52

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 2.340 75,000.00 175,500.00
Tukang Batu L.02 OH 1.200 90,000.00 108,000.00
Kepala Tukang L.03 OH 0.900 95,000.00 85,500.00
Mandor L.04 OH 0.900 100,000.00 90,000.00
JUMLAH TENAGA KERJA 459,000.00
B BAHAN
Semen Kg 371.000 1,137.50 422,012.50
Pasir Beton Kg 698.000 244.29 170,511.43
Kerikil (maksimum 30 mm) Kg 1,047.000 220.00 230,340.00
Air ltr 215.000 72.00 15,480.00
JUMLAH HARGA BAHAN 838,343.93
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 1,297,343.93
E Overhead & Profit 15% x D 194,601.59
F Harga Satuan Pekerjaan (D+E) 1,491,945.52
A 4.1.1.18 Pembesian 1m3 dengan Besi Polos 1,640,015.00

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 5.150 75,000.00 386,250.00
Tukang Besi L.02 OH 0.580 90,000.00 52,200.00
Kepala Tukang L.03 OH 0.070 95,000.00 6,650.00
Mandor L.04 OH 0.040 100,000.00 4,000.00
449,100.00
B BAHAN
Besi Beton (polos/ulir) Kg 95.000 10,000.00 950,000.00
Kawat Beton Kg 1.500 18,000.00 27,000.00
JUMLAH HARGA BAHAN 977,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 1,426,100.00
E Overhead & Profit 15% x D 213,915.00
F Harga Satuan Pekerjaan (D+E) 1,640,015.00

A 4.1.1. 24.a Pemasangan 1 m2 Bekisting untuk saluran 314,881.50

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.679 75,000.00 50,925.00
Tukang Kayu L.02 OH 0.330 90,000.00 29,700.00
Kepala Tukang L.03 OH 0.033 95,000.00 3,135.00
Mandor L.04 OH 0.033 100,000.00 3,300.00
JUMLAH TENAGA KERJA 87,060.00
B BAHAN
Kayu Klas III (Terentang) m3 0.020 2,700,000.00 54,000.00
Paku Biasa 2" - 5" Kg 0.400 13,500.00 5,400.00
Minyak Bekisting Ltr 0.200 27,000.00 5,400.00
Balok Kayu Klas II m3 0.008 7,650,000.00 57,375.00
Plywood tebal 9mm Lbr 0.175 99,000.00 17,325.00
Dolken Kayu Galam diameter 8 - 10 cm / 4 m Btg 3.000 15,750.00 47,250.00
JUMLAH HARGA BAHAN 186,750.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 273,810.00
E Overhead & Profit 15% x D 41,071.50
F Harga Satuan Pekerjaan (D+E) 314,881.50
A. 4.2.1.HARGA SATUAN PEKERJAAN BESI & ALLUMUNIUM
A. 4.2.1.1 Pemasangan 1 kg Besi Profil 26,620.20

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.060 67,500.00 4,050.00
Tukang Besi L.02 OH 0.060 81,000.00 4,860.00
Kepala Tukang L.03 OH 0.006 85,500.00 513.00
Mandor L.04 OH 0.003 90,000.00 270.00
JUMLAH TENAGA KERJA 9,693.00
B BAHAN
Besi Profil Kg 1.150 11,700.00 13,455.00
JUMLAH HARGA BAHAN 13,455.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 23,148.00
E Overhead & Profit 15% x D 3,472.20
F Harga Satuan Pekerjaan (D+E) 26,620.20

A. 4.2.1.2 Pemasangan 1 kg Rangka Kuda-kuda Baja IWF 26,620.20

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.060 67,500.00 4,050.00
Tukang Besi L.02 OH 0.060 81,000.00 4,860.00
Kepala Tukang L.03 OH 0.006 85,500.00 513.00
Mandor L.04 OH 0.003 90,000.00 270.00
JUMLAH TENAGA KERJA 9,693.00
B BAHAN
Besi Baja IWF kg 1.150 11,700.00 13,455.00
JUMLAH HARGA BAHAN 13,455.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 23,148.00
E Overhead & Profit 15% x D 3,472.20
F Harga Satuan Pekerjaan (D+E) 26,620.20

A. 4.2.1.3 Pengerjaan 100 kg Pekerjaan Perakitan 162,593.33

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.100 67,500.00 6,750.00
Tukang Besi L.02 OH 0.100 81,000.00 8,100.00
Kepala Tukang L.03 OH 0.001 85,500.00 85.50
Mandor L.04 OH 0.005 90,000.00 450.00
JUMLAH TENAGA KERJA 15,385.50
B BAHAN
Solar ltr 1.000 8,100.00 8,100.00
Minyak Pelumas ltr 0.100 27,000.00 2,700.00
JUMLAH HARGA BAHAN 10,800.00
C PERALATAN
Sewa Alat jam 0.800 144,000.00 115,200.00
JUMLAH HARGA ALAT 115,200.00

D Jumlah A + B + C 141,385.50
E Overhead & Profit 15% x D 21,207.83
F Harga Satuan Pekerjaan (D+E) 162,593.33

A. 4.2.1.4 Pembuatan 1 m2 Pintu Besi Plat Baja tebal 2 mm rangkap, rangka baja Siku 839,493.68

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 1.050 67,500.00 70,875.00
Tukang Besi L.02 OH 1.050 81,000.00 85,050.00
Kepala Tukang L.03 OH 0.105 85,500.00 8,977.50
Mandor L.04 OH 0.052 90,000.00 4,680.00
JUMLAH TENAGA KERJA 169,582.50
B BAHAN
Besi Siku L.30.30.3 Kg 15.000 11,700.00 175,500.00
Besi Plat Baja Kg 32.800 11,700.00 383,760.00
Kawat Las Kg 0.050 23,040.00 1,152.00
JUMLAH HARGA BAHAN 560,412.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 729,994.50
E Overhead & Profit 15% x D 109,499.18
F Harga Satuan Pekerjaan (D+E) 839,493.68

A. 4.2.1.5 Pengerjaan 10 cm Pengelasan dengan Las Listrik 48,158.55

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.040 67,500.00 2,700.00
Tukang Besi L.02 OH 0.020 81,000.00 1,620.00
Kepala Tukang L.03 OH 0.002 85,500.00 171.00
Mandor L.04 OH 0.002 90,000.00 180.00
JUMLAH TENAGA KERJA 4,671.00
B BAHAN
Kawat Las kg 0.400 23,040.00 9,216.00
Solar ltr 0.300 8,100.00 2,430.00
Minyak Pelumas ltr 0.040 27,000.00 1,080.00
JUMLAH HARGA BAHAN 12,726.00
C PERALATAN
Sewa Alat jam 0.170 144,000.00 24,480.00
JUMLAH HARGA ALAT 24,480.00

D Jumlah A + B + C 41,877.00
E Overhead & Profit 15% x D 6,281.55
F Harga Satuan Pekerjaan (D+E) 48,158.55

A. 4.2.1.7 Pemasangan 1 m2 Pintu Rolling Door Besi 326,025.00

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 1.200 67,500.00 81,000.00
Tukang Besi L.02 OH 1.200 81,000.00 97,200.00
Kepala Tukang L.03 OH 0.120 85,500.00 10,260.00
Mandor L.04 OH 0.006 90,000.00 540.00
JUMLAH TENAGA KERJA 189,000.00
B BAHAN
Pintu Gulung Besi m2 1.000 94,500.00 94,500.00
JUMLAH HARGA BAHAN 94,500.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah A + B + C 283,500.00
E Overhead & Profit 15% x D 42,525.00
F Harga Satuan Pekerjaan (D+E) 326,025.00

A. 4.2.1.8 Pemasangan 1 m2 Pintu Lipat (Folding Door) 650,994.30

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.440 67,500.00 29,700.00
Tukang Besi L.02 OH 0.440 81,000.00 35,640.00
Kepala Tukang L.03 OH 0.044 85,500.00 3,762.00
Mandor L.04 OH 0.022 90,000.00 1,980.00
JUMLAH TENAGA KERJA 71,082.00
B BAHAN
Pintu Lipat m2 1.000 495,000.00 495,000.00
JUMLAH HARGA BAHAN 495,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 566,082.00
E Overhead & Profit 15% x D 84,912.30
F Harga Satuan Pekerjaan (D+E) 650,994.30

A. 4.2.1.9 Pemasangan 1 m2 Sunscreen Allumunium 464,715.00

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.080 67,500.00 5,400.00
Tukang Besi L.02 OH 0.800 81,000.00 64,800.00
Kepala Tukang L.03 OH 0.080 85,500.00 6,840.00
Mandor L.04 OH 0.004 90,000.00 360.00
JUMLAH TENAGA KERJA 77,400.00
B BAHAN
Sunscreen Allumunium m2 1.000 326,700.00 326,700.00
JUMLAH HARGA BAHAN 326,700.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 404,100.00
E Overhead & Profit 15% x D 60,615.00
F Harga Satuan Pekerjaan (D+E) 464,715.00

A. 4.2.1.10 Pemasangan 1 m2 Rolling Door Allumunium 522,157.50

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 1.000 67,500.00 67,500.00
Tukang Besi L.02 OH 1.000 81,000.00 81,000.00
Kepala Tukang L.03 OH 0.100 85,500.00 8,550.00
Mandor L.04 OH 0.050 90,000.00 4,500.00
JUMLAH TENAGA KERJA 161,550.00
B BAHAN
Rolling Allumunium m2 1.000 292,500.00 292,500.00
JUMLAH HARGA BAHAN 292,500.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah A + B + C 454,050.00
E Overhead & Profit 15% x D 68,107.50
F Harga Satuan Pekerjaan (D+E) 522,157.50

A. 4.2.1.11 Pemasangan 1 m Kusen Pintu Allumunium 120,073.97

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.043 67,500.00 2,902.50
Tukang Besi L.02 OH 0.043 81,000.00 3,483.00
Kepala Tukang L.03 OH 0.004 85,500.00 367.65
Mandor L.04 OH 0.002 90,000.00 189.00
JUMLAH TENAGA KERJA 6,942.15
B BAHAN
Profil Allumunium m' 1.100 84,150.00 92,565.00
Skrup Fixer buah 2.000 900.00 1,800.00
Sealant Tube 0.060 51,750.00 3,105.00
JUMLAH HARGA BAHAN 97,470.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 104,412.15
E Overhead & Profit 15% x D 15,661.82
F Harga Satuan Pekerjaan (D+E) 120,073.97

A. 4.2.1.12 Pemasangan 1 m2 Pintu Allumunium Strip Lebar 8 cm 517,140.34

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.085 67,500.00 5,737.50
Tukang Besi L.02 OH 0.085 81,000.00 6,885.00
Kepala Tukang L.03 OH 0.009 85,500.00 726.75
Mandor L.04 OH 0.004 90,000.00 378.00
JUMLAH TENAGA KERJA 13,727.25
B BAHAN
Profil Allumunium m' 4.400 84,150.00 370,260.00
Allumunium Strip m' 14.600 4,500.00 65,700.00
JUMLAH HARGA BAHAN 435,960.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 449,687.25
E Overhead & Profit 15% x D 67,453.09
F Harga Satuan Pekerjaan (D+E) 517,140.34

A. 4.2.1.13 Pemasangan 1 m2 Pintu Kaca Rangka Allumunium 485,730.68

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.085 67,500.00 5,737.50
Tukang Besi L.02 OH 0.085 81,000.00 6,885.00
Kepala Tukang L.03 OH 0.009 85,500.00 769.50
Mandor L.04 OH 0.005 90,000.00 450.00
JUMLAH TENAGA KERJA 13,842.00
B BAHAN
Pintu Allumunium m' 4.400 84,150.00 370,260.00
Profil Kaca m' 4.500 5,400.00 24,300.00
Sealant tube 0.270 51,750.00 13,972.50
JUMLAH HARGA BAHAN 408,532.50
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 422,374.50
E Overhead & Profit 15% x D 63,356.18
F Harga Satuan Pekerjaan (D+E) 485,730.68

A. 4.2.1.14 Pemasangan 1 m2 Venetions Blinds & Vertical Blinds 168,575.63

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.350 67,500.00 23,625.00
Tukang Besi L.02 OH 0.350 81,000.00 28,350.00
Kepala Tukang L.03 OH 0.035 85,500.00 2,992.50
Mandor L.04 OH 0.018 90,000.00 1,620.00
JUMLAH TENAGA KERJA 56,587.50
B BAHAN
Venetions Blinds atau Vertical Blinds (tirai) m2 1.000 90,000.00 90,000.00
JUMLAH HARGA BAHAN 90,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 146,587.50
E Overhead & Profit 15% x D 21,988.13
F Harga Satuan Pekerjaan (D+E) 168,575.63

A. 4.2.1.15 Pemasangan 1 m2 Terali Besi Strip (2x3) cm 543,291.92

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 1.670 67,500.00 112,725.00
Tukang Las L.02 OH 1.670 81,000.00 135,270.00
Kepala Tukang L.03 OH 0.167 85,500.00 14,278.50
Mandor L.04 OH 0.083 90,000.00 7,470.00
JUMLAH TENAGA KERJA 269,743.50
B BAHAN
Besi Strip 2x3 m' 6.177 11,700.00 72,270.90
Pengelasan cm 27.080 4,815.86 130,413.35
JUMLAH HARGA BAHAN 202,684.25
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 472,427.75
E Overhead & Profit 15% x D 70,864.16
F Harga Satuan Pekerjaan (D+E) 543,291.92

A. 4.2.1.16 Pemasangan 1 m2 Kawat Nyamuk 115,720.30

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.100 67,500.00 6,750.00
Tukang Kayu L.02 OH 0.100 81,000.00 8,100.00
Kepala Tukang L.03 OH 0.010 85,500.00 855.00
Mandor L.04 OH 0.005 90,000.00 450.00
JUMLAH TENAGA KERJA 16,155.00
B BAHAN
Kawat Nyamuk nylon m2 1.100 9,900.00 10,890.00
Pengelasan cm 11.110 4,815.86 53,504.15
Baja Strip (0,2x2) cm kg 1.716 11,700.00 20,077.20
JUMLAH HARGA BAHAN 84,471.35
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 100,626.35
E Overhead & Profit 15% x D 15,093.95
F Harga Satuan Pekerjaan (D+E) 115,720.30

A. 4.2.1.17 Pemasangan 1 m2 Jendela Nako & Tralis 269,358.75

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.200 67,500.00 13,500.00
Tukang Kayu L.02 OH 0.200 81,000.00 16,200.00
Kepala Tukang L.03 OH 0.020 85,500.00 1,710.00
Mandor L.04 OH 0.001 90,000.00 90.00
JUMLAH TENAGA KERJA 31,500.00
B BAHAN
Jendela Nako m2 1.100 15,750.00 17,325.00
Paku Skrup 1 - 2,5 cm buah 10.000 10,350.00 103,500.00
Besi Strip m' 7.000 11,700.00 81,900.00
JUMLAH HARGA BAHAN 202,725.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 234,225.00
E Overhead & Profit 15% x D 35,133.75
F Harga Satuan Pekerjaan (D+E) 269,358.75

A. 4.2.1.18 Pemasangan 1 m2 Talang Datar/Jurai , Seng BJLS 28 Lebar 90 cm 216,796.28

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.200 67,500.00 13,500.00
Tukang Kayu L.02 OH 0.200 81,000.00 16,200.00
Kepala Tukang L.03 OH 0.020 85,500.00 1,710.00
Mandor L.04 OH 0.001 90,000.00 90.00
JUMLAH TENAGA KERJA 31,500.00
B BAHAN
Seng Plaat Lbr 1.050 22,320.00 23,436.00
Paku Biasa 1 - 2,5 cm Kg 0.015 13,500.00 202.50
Kayu Papan Klas II atau III m3 0.019 7,020,000.00 133,380.00
JUMLAH HARGA BAHAN 157,018.50
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 188,518.50
E Overhead & Profit 15% x D 28,277.78
F Harga Satuan Pekerjaan (D+E) 216,796.28

A. 4.2.1.19 Pemasangan 1 m Talang 1/2 Lingkaran Ø 15 cm, Seng Plaat BJLS 30 Lebar 45 cm 77,200.65
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.150 67,500.00 10,125.00
Tukang Kayu L.02 OH 0.300 81,000.00 24,300.00
Kepala Tukang L.03 OH 0.030 85,500.00 2,565.00
Mandor L.04 OH 0.008 90,000.00 720.00
JUMLAH TENAGA KERJA 37,710.00
B BAHAN
Seng Plaat Lbr 1.050 22,320.00 23,436.00
Paku Biasa 1 - 2,5 cm Kg 0.010 13,500.00 135.00
Besi strip Kg 0.500 11,700.00 5,850.00
JUMLAH HARGA BAHAN 29,421.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 67,131.00
E Overhead & Profit 15% x D 10,069.65
F Harga Satuan Pekerjaan (D+E) 77,200.65

A. 4.2.1.20 Pemasangan 1 m2 rangka hollow 1x40.40 mm, modul 60 x 120 cm dinding partisi 85,348.69

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.250 67,500.00 16,875.00
Tukang besi L.02 OH 0.250 81,000.00 20,250.00
Kepala Tukang L.03 OH 0.025 85,500.00 2,137.50
Mandor L.04 OH 0.013 90,000.00 1,170.00
JUMLAH TENAGA KERJA 40,432.50
B BAHAN
Rangka metal hollow 40.40 mm m' 3.500 7,425.00 25,987.50
Assesories (perkuatan, las dll) Ls 0.300 25,987.50 7,796.25
JUMLAH HARGA BAHAN 33,783.75
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 74,216.25
E Overhead & Profit 15% x D 11,132.44
F Harga Satuan Pekerjaan (D+E) 85,348.69

A. 4.2.1.21 Pemasangan 1 m2 rangka hollow 1x40.40 mm, modul 60 x 60 cm, plafon 109,477.13

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.350 67,500.00 23,625.00
Tukang besi L.02 OH 0.350 81,000.00 28,350.00
Kepala Tukang L.03 OH 0.035 85,500.00 2,992.50
Mandor L.04 OH 0.018 90,000.00 1,620.00
JUMLAH TENAGA KERJA 56,587.50
B BAHAN
Rangka metal hollow 40.40 mm m' 4.000 7,425.00 29,700.00
Assesories (perkuatan, las dll) Ls 0.300 29,700.00 8,910.00
JUMLAH HARGA BAHAN 38,610.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 95,197.50
E Overhead & Profit 15% x D 14,279.63
F Harga Satuan Pekerjaan (D+E) 109,477.13

A. 4.2.1.22 Pemasangan 1 m2 rangka C.75.70, modul 60 x 120 cm dinding partisi 137,150.44

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA

Pekerja L.01 OH 0.250 67,500.00 16,875.00

Tukang besi L.02 OH 0.250 81,000.00 20,250.00


Kepala Tukang L.03 OH 0.025 85,500.00 2,137.50

Mandor L.04 OH 0.013 90,000.00 1,170.00

JUMLAH TENAGA KERJA 40,432.50

B BAHAN

Rangka Baja Ringan C.75.70 m' 3.500 17,325.00 60,637.50


Assesories (perkuatan, las dll) Ls 0.300 60,637.50 18,191.25

JUMLAH HARGA BAHAN 78,828.75

C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 119,261.25
E Overhead & Profit 15% x D 17,889.19
F Harga Satuan Pekerjaan (D+E) 137,150.44
A. 4.4.1.HARGA SATUAN PEKERJAAN PASANGAN DINDING
A. 4.4.1.10 Pemasangan 1 m2 Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP 130,704.40

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.300 67,500.00 20,250.00
Tukang Batu L.02 OH 0.100 81,000.00 8,100.00
Kepala Tukang Batu L.03 OH 0.010 85,500.00 855.00
Mandor L.04 OH 0.015 90,000.00 1,350.00
JUMLAH TENAGA KERJA 30,555.00
B BAHAN
Bata Merah 5 x 11 x 22 Buah 70.000 810.00 56,700.00
Semen Kg 9.680 1,137.50 11,011.00
Pasir Pasang m3 0.045 342,000.00 15,390.00
JUMLAH HARGA BAHAN 83,101.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 113,656.00
E Overhead & Profit 15% x D 17,048.40
F Harga Satuan Pekerjaan (D+E) 130,704.40
A. 4.4.2.HARGA SATUAN PEKERJAAN PLESTERAN

A. 4.4.2.16 Pemasangan 1 m2 Plesteran 1Pc : 5Pp Tebal 20 mm 94,753.10

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.430 75,000.00 32,250.00
Tukang batu L.02 OH 0.200 90,000.00 18,000.00
Kepala Tukang L.03 OH 0.020 95,000.00 1,900.00
Mandor L.04 OH 0.022 100,000.00 2,200.00
JUMLAH TENAGA KERJA 54,350.00
B BAHAN
Semen Kg 8.550 1,200.00 10,260.00
Pasir Pasang m3 0.052 342,000.00 17,784.00
JUMLAH HARGA BAHAN 28,044.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 82,394.00
E Overhead & Profit 15% x D 12,359.10
F Harga Satuan Pekerjaan (D+E) 94,753.10

A. 4.4.2.27 Pemasangan 1 m2 Acian 54,165.00

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.430 75,000.00 32,250.00
Tukang batu L.02 OH 0.100 90,000.00 9,000.00
Kepala Tukang L.03 OH 0.010 95,000.00 950.00
Mandor L.04 OH 0.010 100,000.00 1,000.00
JUMLAH TENAGA KERJA 43,200.00
B BAHAN
Semen Kg 3.250 1,200.00 3,900.00
JUMLAH HARGA BAHAN 3,900.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 47,100.00
E Overhead & Profit 15% x D 7,065.00
F Harga Satuan Pekerjaan (D+E) 54,165.00
A.4.4.3 A. 4.4.3.HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN DINDING
A.4.4.3.9 A. 4.4.3.13.a Pemasangan 1 m2 lantai Keramik Uk. 60 x 60 cm

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)

A TENAGA
Pekerja L.01 OH 0.240 67,500.00
Tukang Batu L.02 OH 0.120 81,000.00
Kepala Tukang L.03 OH 0.012 85,500.00
Mandor L.04 OH 0.012 90,000.00
JUMLAH TENAGA KERJA
B BAHAN
Ubin Keramik 60x60 cm Buah 3.100 57,600.00
Semen Kg 9.600 1,137.50
Semen warna Kg 1.500 2,250.00
Pasir Pasang m3 0.045 342,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah A + B + C
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.35 A. 4.4.3.35 Pemasangan 1 m2 Lantai Keramik 30 x 30 cm

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)

A TENAGA
Pekerja L.01 OH 0.700 67,500.00
Tukang Batu L.02 OH 0.350 81,000.00
Kepala Tukang L.03 OH 0.035 85,500.00
Mandor L.04 OH 0.035 90,000.00
JUMLAH TENAGA KERJA
B BAHAN
Ubin Keramik 30 x 30 cm Buah 11.870 3,564.00
Semen Kg 10.000 1,137.50
Pasir Pasang m3 0.045 342,000.00
Semen Warna Kg 1.500 2,250.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah A + B + C
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.36 A. 4.4.3.36 Pemasangan 1 m2 Lantai Keramik 20 x 20 cm

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)

A TENAGA
Pekerja L.01 OH 0.700 67,500.00
Tukang Batu L.02 OH 0.350 81,000.00
Kepala Tukang L.03 OH 0.035 85,500.00
Mandor L.04 OH 0.035 90,000.00
JUMLAH TENAGA KERJA
B BAHAN
Ubin Keramik 20 x 20 cm Buah 26.500 2,052.00
Semen Kg 10.400 1,137.50
Semen Warna Kg 1.620 2,250.00
Pasir Pasang m3 0.045 342,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah A + B + C
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.36 A. 4.4.3.36a Bongkar Keramik Existing

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)

A TENAGA
Pekerja L.01 OH 0.700 67,500.00
Kepala Tukang L.03 OH 0.035 85,500.00
Mandor L.04 OH 0.035 90,000.00
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah A + B + C
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.37 A. 4.4.3.37 Pemasangan 1 m2 Lantai Keramik uk.10 x 33 cm, untuk variasi / border

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)

A TENAGA
Pekerja L.01 OH 1.050 67,500.00
Tukang Batu L.02 OH 0.525 81,000.00
Kepala Tukang L.03 OH 0.053 85,500.00
Mandor L.04 OH 0.035 90,000.00
JUMLAH TENAGA KERJA
B BAHAN
Ubin Keramik Buah 33.000 4,050.00
Semen Kg 9.800 1,137.50
Semen Warna Kg 4.370 2,250.00
Pasir Pasang m3 0.045 342,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah A + B + C
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.39 A. 4.4.3.39 Pemasangan 1 m' Plint Keramik Ukuran 10x20 cm

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)

A TENAGA
Pekerja L.01 OH 0.090 75,000.00
Tukang Batu L.02 OH 0.090 90,000.00
Kepala Tukang L.03 OH 0.035 95,000.00
Mandor L.04 OH 0.005 100,000.00
JUMLAH TENAGA KERJA
B BAHAN
Ubin Keramik Buah 5.300 5,500.00
Semen Kg 1.140 1,137.50
Pasir Pasang m3 0.003 342,000.00
Semen Warna Kg 0.025 2,250.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah A + B + C
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.40 A. 4.4.3.40 Pemasangan 1 m' Plint Keramik Ukuran 10x10 cm

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)

A TENAGA
Pekerja L.01 OH 0.090 67,500.00
Tukang Batu L.02 OH 0.090 81,000.00
Kepala Tukang L.03 OH 0.035 85,500.00
Mandor L.04 OH 0.005 90,000.00
JUMLAH TENAGA KERJA
B BAHAN
Ubin Keramik Buah 10.600 5,500.00
Semen Kg 1.140 1,137.50
Pasir Pasang m3 0.003 342,000.00
Semen Warna Kg 0.050 2,250.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah A + B + C
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.41 A. 4.4.3.41 Pemasangan 1 m' Plint Keramik Ukuran 5x20 cm

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)

A TENAGA
Pekerja L.01 OH 0.090 67,500.00
Tukang Batu L.02 OH 0.090 81,000.00
Kepala Tukang L.03 OH 0.035 85,500.00
Mandor L.04 OH 0.005 90,000.00
JUMLAH TENAGA KERJA
B BAHAN
Ubin Keramik Buah 5.300 4,050.00
Semen Kg 0.570 1,137.50
Pasir Pasang m3 0.002 342,000.00
Semen Warna Kg 0.013 2,250.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah A + B + C
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)
A.4.4.3.43 A. 4.4.3.43 Pemasangan 1 m' Lantai Marmer Ukuran 100x100 cm

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)

A TENAGA
Pekerja L.01 OH 0.700 67,500.00
Tukang Batu L.02 OH 0.350 81,000.00
Kepala Tukang L.03 OH 0.035 85,500.00
Mandor L.04 OH 0.035 90,000.00
JUMLAH TENAGA KERJA
B BAHAN
Marmer buah 1.060 1,755,000.00
Semen kg 8.190 1,137.50
Pasir Pasang m3 0.045 342,000.00
Semen Warna kg 0.650 2,250.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah A + B + C
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.44 A. 4.4.3.44 Pemasangan 1 m2 Lantai Karpet

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)

A TENAGA
Pekerja L.01 OH 0.170 67,500.00
Tukang Batu L.02 OH 0.170 81,000.00
Kepala Tukang L.03 OH 0.017 85,500.00
Mandor L.04 OH 0.009 90,000.00
JUMLAH TENAGA KERJA
B BAHAN
Karpet m2 1.050 117,000.00
Lem kg 0.350 34,200.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah A + B + C
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.46 A. 4.4.3.46 Pemasangan 1 m2 Lantai Parquet Jati

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)

A TENAGA
Pekerja L.01 OH 0.700 67,500.00
Tukang Batu L.02 OH 0.350 81,000.00
Kepala Tukang L.03 OH 0.035 85,500.00
Mandor L.04 OH 0.035 90,000.00
JUMLAH TENAGA KERJA
B BAHAN
Parquet Jati m2 1.050 189,000.00
Lem Vynil Kg 0.600 34,200.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah A + B + C
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.48 A. 4.4.3.48 Pemasangan 1 m2 Dinding Porselen 11 x 11 cm

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)

A TENAGA
Pekerja L.01 OH 1.000 67,500.00
Tukang Batu L.02 OH 0.500 81,000.00
Kepala Tukang L.03 OH 0.050 85,500.00
Mandor L.04 OH 0.050 90,000.00
JUMLAH TENAGA KERJA
B BAHAN
Porselen bh 86.000 536.59
Semen 82.6446280992 Kg 9.300 1,137.50
Semen Warna 0.0121 Kg 1.500 2,250.00
Pasir Pasang 0.11 m3 0.018 342,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah A + B + C
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.49 A. 4.4.3.49 Pemasangan 1 m2 Dinding Keramik 10x20 cm,

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)

A TENAGA
Pekerja L.01 OH 0.900 67,500.00
Tukang Batu L.02 OH 0.450 81,000.00
Kepala Tukang L.03 OH 0.045 85,500.00
Mandor L.04 OH 0.045 90,000.00
JUMLAH TENAGA KERJA
B BAHAN
Keramik Buah 53.000 1,017.00
Semen Kg 9.300 1,137.50
Pasir Pasang m3 0.018 342,000.00
Semen Warna Kg 2.750 2,250.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah A + B + C
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.50 A. 4.4.3.50 Pemasangan 1 m2 Dinding Keramik 20x20 cm,

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)

A TENAGA
Pekerja L.01 OH 0.900 67,500.00
Tukang Batu L.02 OH 0.450 81,000.00
Kepala Tukang L.03 OH 0.045 85,500.00
Mandor L.04 OH 0.045 90,000.00
JUMLAH TENAGA KERJA
B BAHAN
Keramik Buah 26.000 2,106.00
Semen Kg 9.300 1,137.50
Pasir Pasang m3 0.018 342,000.00
Semen Warna Kg 1.940 2,250.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah A + B + C
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.53 A. 4.4.3.53 Pemasangan 1 m2 Dinding Keramik 10x20 cm,

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)

A TENAGA
Pekerja L.01 OH 0.900 67,500.00
Tukang Batu L.02 OH 0.450 81,000.00
Kepala Tukang L.03 OH 0.045 85,500.00
Mandor L.04 OH 0.045 90,000.00
JUMLAH TENAGA KERJA
B BAHAN
Keramik Buah 53.000 1,017.00
Semen Kg 9.300 1,137.50
Pasir Pasang m3 0.018 342,000.00
Semen Warna Kg 2.750 2,250.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah A + B + C
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.54 A. 4.4.3.54 Pemasangan 1 m2 Dinding Keramik 20x20 cm,

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)

A TENAGA
Pekerja L.01 OH 0.900 67,500.00
Tukang Batu L.02 OH 0.450 81,000.00
Kepala Tukang L.03 OH 0.045 85,500.00
Mandor L.04 OH 0.045 90,000.00
JUMLAH TENAGA KERJA
B BAHAN
Keramik Buah 26.500 2,106.00
Semen Kg 9.300 1,137.50
Pasir Pasang m3 0.018 342,000.00
Semen Warna Kg 1.940 2,250.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah A + B + C
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.55 A. 4.4.3.55 Pemasangan 1 m2 Dinding Marmer Ukuran 100x100 cm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)

A TENAGA
Pekerja L.01 OH 1.300 67,500.00
Tukang Batu L.02 OH 0.650 81,000.00
Kepala Tukang L.03 OH 0.065 85,500.00
Mandor L.04 OH 0.065 90,000.00
JUMLAH TENAGA KERJA
B BAHAN
Marmer buah 1.060 1,755,000.00
Paku 12 cm buah 3.030 225.00
Portlan Semen kg 12.440 1,137.50
Pasir Pasang m3 0.025 342,000.00
Semen Warna kg 0.650 2,250.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah A + B + C
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.58 A. 4.4.3.58 Pemasangan 1 m2 Dinding Batu Paros / Batu Tempel Hitam

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)

A TENAGA
Pekerja L.01 OH 0.700 67,500.00
Tukang Batu L.02 OH 0.350 81,000.00
Kepala Tukang L.03 OH 0.035 85,500.00
Mandor L.04 OH 0.035 90,000.00
JUMLAH TENAGA KERJA
B BAHAN
Batu Paros m2 1.100 117,000.00
Semen Kg 11.750 1,137.50
Pasir Pasang m3 0.035 342,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah A + B + C
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.59 A. 4.4.3.59 Pemasangan 1 m2 Lantai Vynil uk.30 x 30 cm

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)

A TENAGA A
Pekerja L.01 OH 0.150 67,500.00
Tukang Batu L.02 OH 0.150 81,000.00
Kepala Tukang L.03 OH 0.015 85,500.00
Mandor L.04 OH 0.008 90,000.00
JUMLAH TENAGA KERJA
B BAHAN
Vynil bh 11.870 40,095.00
Lem kg 0.350 34,200.00

JUMLAH HARGA BAHAN


C PERALATAN
JUMLAH HARGA ALAT

D Jumlah A + B + C
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.63 A. 4.4.3.63 Pemasangan 1 m2 Plint Kayu Klas II Ukuran 2x10 cm

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)

A TENAGA
Pekerja L.01 OH 0.120 67,500.00
Tukang Batu L.02 OH 0.120 81,000.00
Kepala Tukang L.03 OH 0.012 85,500.00
Mandor L.04 OH 0.006 90,000.00
JUMLAH TENAGA KERJA
B BAHAN
Papan Kayu Klas II m3 0.003 11,700,000.00
Paku Sekrup 5 cm kg 0.050 10,350.00

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah A + B + C
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)

A. 4.4.3.64 Pemasangan 1 m2 Lantai Keramik 40 X 40 cm ( Motif )

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)

A TENAGA
Pekerja L.01 OH 0.700 75,000.00
Tukang Batu L.02 OH 0.450 90,000.00
Kepala Tukang L.03 OH 0.035 95,000.00
Mandor L.04 OH 0.070 100,000.00
JUMLAH TENAGA KERJA
B BAHAN
Ubin keramik 40 x 40 (motif) m2 1.000 90,000.00
Semen Kg 8.190 1,137.50
Pasir Pasang m3 0.045 342,000.00
Semen Warna Kg 1.620 11,550.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah A + B + C
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)

A. 4.4.3.64.a Pemasangan 1 m2 Lantai Keramik 40 X 40 cm ( Polos )

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)

A TENAGA
Pekerja L.01 OH 0.700 67,500.00
Tukang Batu L.02 OH 0.350 81,000.00
Kepala Tukang L.03 OH 0.035 85,500.00
Mandor L.04 OH 0.035 90,000.00
JUMLAH TENAGA KERJA
B BAHAN
Ubin keramik 40 x 40 (polos) Buah 7.000 8,250.00
Semen Kg 8.190 1,137.50
Pasir Pasang m3 0.045 342,000.00
Semen Warna Kg 1.620 2,250.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah A + B + C
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)

A. 4.4.3.65 Pemasangan 1 m2 Dinding Keramik 20x25 cm,

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)

A TENAGA
Pekerja L.01 OH 0.900 67,500.00
Tukang Batu L.02 OH 0.450 81,000.00
Kepala Tukang L.03 OH 0.045 85,500.00
Mandor L.04 OH 0.045 90,000.00
JUMLAH TENAGA KERJA
B BAHAN
Keramik Buah 22.000 2,587.50
Semen Kg 9.300 1,137.50
Pasir Pasang m3 0.018 342,000.00
Semen Warna Kg 1.940 2,250.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah A + B + C
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)
271,711.65

Jumlah Harga
(Rp.)

16,200.00
9,720.00
1,026.00
1,080.00
28,026.00

178,560.00
10,920.00
3,375.00
15,390.00
208,245.00

236,271.00
35,440.65
271,711.65

177,315.26

Jumlah Harga
(Rp.)

47,250.00
28,350.00
2,992.50
3,150.00
81,742.50

42,304.68
11,375.00
15,390.00
3,375.00
72,444.68

154,187.18
23,128.08
177,315.26

192,033.33

Jumlah Harga
(Rp.)

47,250.00
28,350.00
2,992.50
3,150.00
81,742.50

54,378.00
11,830.00
3,645.00
15,390.00
85,243.00

166,985.50
25,047.83
192,033.33

61,401.38

Jumlah Harga
(Rp.)

47,250.00
2,992.50
3,150.00
53,392.50

53,392.50
8,008.88
61,401.38

334,766.73

Jumlah Harga
(Rp.)

70,875.00
42,525.00
4,531.50
3,150.00
121,081.50

133,650.00
11,147.50
9,832.50
15,390.00
170,020.00

291,101.50
43,665.23
334,766.73

57,734.60

Jumlah Harga
(Rp.)

6,750.00
8,100.00
3,325.00
500.00
18,675.00

29,150.00
1,296.75
1,026.00
56.25
31,529.00

50,204.00
7,530.60
57,734.60

89,174.16

Jumlah Harga
(Rp.)

6,075.00
7,290.00
2,992.50
450.00
16,807.50

58,300.00
1,296.75
1,026.00
112.50
60,735.25

77,542.75
11,631.41
89,174.16

45,382.59

Jumlah Harga
(Rp.)

6,075.00
7,290.00
2,992.50
450.00
16,807.50

21,465.00
648.38
513.00
29.25
22,655.63

39,463.13
5,919.47
45,382.59
2,263,442.79

Jumlah Harga
(Rp.)

47,250.00
28,350.00
2,992.50
3,150.00
81,742.50

1,860,300.00
9,316.13
15,390.00
1,462.50
1,886,468.63

1,968,211.13
295,231.67
2,263,442.79

186,677.78

Jumlah Harga
(Rp.)

11,475.00
13,770.00
1,453.50
810.00
27,508.50

122,850.00
11,970.00
134,820.00

162,328.50
24,349.28
186,677.78

345,819.38

Jumlah Harga
(Rp.)

47,250.00
28,350.00
2,992.50
3,150.00
81,742.50

198,450.00
20,520.00
218,970.00

-
300,712.50
45,106.88
345,819.38

210,485.76

Jumlah Harga
(Rp.)

67,500.00
40,500.00
4,275.00
4,500.00
116,775.00

46,146.34
10,578.75
3,375.00
6,156.00
66,256.09

183,031.09
27,454.66
210,485.76

209,208.86

Jumlah Harga
(Rp.)

60,750.00
36,450.00
3,847.50
4,050.00
105,097.50

53,901.00
10,578.75
6,156.00
6,187.50
76,823.25

181,920.75
27,288.11
209,208.86

208,096.24

Jumlah Harga
(Rp.)

60,750.00
36,450.00
3,847.50
4,050.00
105,097.50
54,756.00
10,578.75
6,156.00
4,365.00
75,855.75

180,953.25
27,142.99
208,096.24

209,208.86

Jumlah Harga
(Rp.)

60,750.00
36,450.00
3,847.50
4,050.00
105,097.50

53,901.00
10,578.75
6,156.00
6,187.50
76,823.25

181,920.75
27,288.11
209,208.86

209,307.19

Jumlah Harga
(Rp.)

60,750.00
36,450.00
3,847.50
4,050.00
105,097.50

55,809.00
10,578.75
6,156.00
4,365.00
76,908.75

182,006.25
27,300.94
209,307.19

2,342,495.09
Jumlah Harga
(Rp.)

87,750.00
52,650.00
5,557.50
5,850.00
151,807.50

1,860,300.00
681.75
14,150.50
8,550.00
1,462.50
1,885,144.75

2,036,952.25
305,542.84
2,342,495.09

271,144.84

Jumlah Harga
(Rp.)

47,250.00
28,350.00
2,992.50
3,150.00
81,742.50

128,700.00
13,365.63
11,970.00
154,035.63

235,778.13
35,366.72
271,144.84

588,949.67

Jumlah Harga
(Rp.)

10,125.00
12,150.00
1,282.50
675.00
24,232.50

475,927.65
11,970.00

487,897.65
-

512,130.15
76,819.52
588,949.67

63,254.03

Jumlah Harga
(Rp.)

8,100.00
9,720.00
1,026.00
540.00
19,386.00

35,100.00
517.50

35,617.50

55,003.50
8,250.53
63,254.03

272,253.44

Jumlah Harga
(Rp.)

52,500.00
40,500.00
3,325.00
7,000.00
103,325.00

90,000.00
9,316.13
15,390.00
18,711.00
133,417.13

236,742.13
35,511.32
272,253.44

193,020.17

Jumlah Harga
(Rp.)

47,250.00
28,350.00
2,992.50
3,150.00
81,742.50

57,750.00
9,316.13
15,390.00
3,645.00
86,101.13

167,843.63
25,176.54
193,020.17

210,590.59

Jumlah Harga
(Rp.)

60,750.00
36,450.00
3,847.50
4,050.00
105,097.50

56,925.00
10,578.75
6,156.00
4,365.00
78,024.75

183,122.25
27,468.34
210,590.59
A. 5.1.1.HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG
A. 5.1.1.1 Pemasangan 1 buah Closet Duduk / Mono Blok 2,326,570.75

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 3.300 67,500.00 222,750.00
Tukang Batu L.02 OH 1.100 81,000.00 89,100.00
Kepala Tukang L.03 OH 0.010 85,500.00 855.00
Mandor L.04 OH 0.160 90,000.00 14,400.00
JUMLAH TENAGA KERJA 327,105.00
B BAHAN
Kloset Duduk / Monoblok Buah 1.000 1,600,000.00 1,600,000.00
Kelengkapan 6% dari harga Kloset Buah 0.060 1,600,000.00 96,000.00
JUMLAH HARGA BAHAN 1,696,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 2,023,105.00
E Overhead & Profit 15% x D 303,465.75
F Harga Satuan Pekerjaan (D+E) 2,326,570.75

A. 5.1.1.5 Pemasangan 1 buah Wastafel 399,182.25

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 1.200 67,500.00 81,000.00
Tukang Batu L.02 OH 0.145 81,000.00 11,745.00
Kepala Tukang L.03 OH 0.150 85,500.00 12,825.00
Mandor L.04 OH 0.100 90,000.00 9,000.00
JUMLAH TENAGA KERJA 114,570.00
B BAHAN
Wastafel Buah 1.000 171,000.00 171,000.00
Perlengkapan 30% Harga Wastafel - 0.300 171,000.00 51,300.00
Semen Kg 6.000 1,137.50 6,825.00
Pasir Pasang m3 0.010 342,000.00 3,420.00
JUMLAH HARGA BAHAN 232,545.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 347,115.00
E Overhead & Profit 15% x D 52,067.25
F Harga Satuan Pekerjaan (D+E) 399,182.25
A. 5.1.1.16 Pemasangan 1 buah Bak Kontrol Pas.Batu Bata 45 x 45 tinggi 50 cm 643,526.20

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 3.200 67,500.00 216,000.00
Tukang Batu L.02 OH 1.150 81,000.00 93,150.00
Kepala Tukang L.03 OH 0.011 85,500.00 940.50
Mandor L.04 OH 0.016 90,000.00 1,440.00
JUMLAH TENAGA KERJA 311,530.50
B BAHAN
Batu Bata bh 70.000 810.00 56,700.00
Semen kg 77.000 1,137.50 87,587.50
Pasir Pasang m3 0.130 342,000.00 44,460.00
Pasir Beton m3 0.090 342,000.00 30,780.00
Kerikil m3 0.020 198,000.00 3,960.00
Baja Tulangan kg 2.600 9,450.00 24,570.00
JUMLAH HARGA BAHAN 248,057.50
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 559,588.00
E Overhead & Profit 15% x D 83,938.20
F Harga Satuan Pekerjaan (D+E) 643,526.20

A. 5.1.1.26 Pemasangan 1 m' Pipa PVC tipe AW Ø ¾" 26,827.20

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.036 67,500.00 2,430.00
Tukang Batu L.02 OH 0.060 81,000.00 4,860.00
Kepala Tukang L.03 OH 0.006 85,500.00 513.00
Mandor L.04 OH 0.002 90,000.00 180.00
JUMLAH TENAGA KERJA 7,983.00
B BAHAN
Pipa PVC Ø ¾" m' 1.200 9,900.00 11,880.00
Perlengkapan 35% x pipa Ls 0.350 9,900.00 3,465.00
JUMLAH HARGA BAHAN 15,345.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 23,328.00
E Overhead & Profit 15% x D 3,499.20
F Harga Satuan Pekerjaan (D+E) 26,827.20
A. 5.1.1.31 Pemasangan 1 m' Pipa PVC tipe AW Ø 3" 142,527.26

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.081 67,500.00 5,467.50
Tukang Batu L.02 OH 0.135 81,000.00 10,935.00
Kepala Tukang L.03 OH 0.014 85,500.00 1,154.25
Mandor L.04 OH 0.004 90,000.00 360.00
JUMLAH TENAGA KERJA 17,916.75
B BAHAN
Pipa PVC Ø 3" m' 1.200 68,400.00 82,080.00
Perlengkapan 35% x pipa Ls 0.350 68,400.00 23,940.00
JUMLAH HARGA BAHAN 106,020.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 123,936.75
E Overhead & Profit 15% x D 18,590.51
F Harga Satuan Pekerjaan (D+E) 142,527.26
REKAPITULASI ANGGARAN BIAYA

KEGIATAN :
PEKERJAAN :
LOKASI :
TAHUN ANGARAN :

NO URAIAN PEKERJAAN TOTAL HARGA

#REF! #REF! 1,000,000.00


#REF! #REF! Err:509
JUMLAH TOTAL Err:509
PPN 10% Err:509
JUMLAH TOTAL + PPN 10% Err:509
DIBULATKAN Err:509
DAFTAR HARGA SATUAN PEKERJAAN

HARGA SATUAN
NO KODE URAIAN PEKERJAAN SAT PEKERJAAN
Rp.

I A. 2.2.1. HARGA SATUAN PEKERJAAN PERSIAPAN

8 A. 2.2.1. 12. Pembongkaran 1 m3 Beton Bertulang m3 1,109,750.00


9 A. 2.2.1. 13. Pembongkaran 1 m3 Pondasi m3 855,082.50

10 A. 2.2.1. 14. Pembongkaran m3 Kansten m3 607,579.50


11 A. 2.2.1. 15 Pembongkaran1 m3 Rabat Beton m3 1,019,820.00

II A. 2.3.1. HARGA SATUAN PEKERJAAN TANAH


1 A. 2.3.1. 1. Penggalian 1 m3 Tanah Biasa Sedalam 1 m m3 70,495.00

2 A. 2.3.1. 11. Pengurugan 1 m3 Pasir dengan Pasir Urug m3 384,962.50


6 A. 2.3.1. 15. Pengurugan 1 m3 Tanah Urug m3 115,143.75

III A. 3.2.1. HARGA SATUAN PEKERJAAN PONDASI


1 A. 3.2.1. 1. Pemasangan 1 m3 Pondasi Batu Belah Campuran 1 SP : 3PP m3 1,212,243.75

III A 4.1.1. HARGA SATUAN PEKERJAAN BETON

1 A 4.1.1. 1 Membuat 1 m3 Beton mutu f'c=7,4 Mpa (K100), slum (12±2)cm, w/c = 0,87 m3 1,136,943.80
3 A 4.1.1. 7 Membuat 1 m3 Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 m3 1,491,945.52

5 A 4.1.1. 18 Pembesian 1m3 dengan Besi Polos m3 1,640,015.00

A 4.1.1. 24.a Pemasangan 1 m2 Bekisting untuk saluran m2 314,881.50

V A. 4.4.2. HARGA SATUAN PEKERJAAN PLESTERAN


12 A. 4.4.2. 16 Pemasangan 1 m2 Plesteran 1Pc : 5Pp Tebal 20 mm m2 94,753.10

2 A. 4.4.2. 27 Pemasangan 1 m2 Acian m2 54,165.00

Penyedia Jasa
CV. BINA SERASI

Sofa Navarawal Zamzama


Direktur
RENCANA ANGGARAN BIAYA
PEKERJAAN : REHAB PELEBARAN JALAN KANTOR PP-PAUD DAN DIKMAS JAWA TENGAH
LOKASI : KANTOR PP-PAUD DAN DIKMAS JAWA TENGAH
TAHUN ANGARAN : 2020

NO URAIAN PEKERJAAN VOLUME HARGA SATUAN JUMLAH HARGA TOTAL HARGA

A PEKERJAAN PERSIAPAN
1 Uitzet Lapangan 1.00 Ls 500,000.00 500,000.00
2 Pembersihan Lapangan 1.00 Ls 500,000.00 500,000.00
3 Buang Bongkaran Keluar Lokasi 1.00 Ls 2,000,000.00 2,000,000.00
JUMLAH A 3,000,000.00
B REHAB SALURAN GEDUNG DIPONEGORO
1 Bongkar Plat Beton Existing 2.75 m3 1,109,750.00 3,050,702.75
2 Bongkar Kansten 1.00 m3 607,579.50 608,582.01
3 Bongkar Pondasi Saluran Sedalam 5cm 0.50 m3 855,082.50 429,678.96
4 Bongkar Rabat Beton Taman 0.72 m3 1,019,820.00 734,270.40
5 Plesteran 60.60 m2 94,753.10 5,742,037.86
6 Acian 79.19 m2 54,165.00 4,289,326.35
7 Beton Lantai Saluran 0.58 m3 1,136,943.80 662,156.07
8 Membuat Grill Besi Plat 2mm 5.00 m1 475,000.00 2,375,000.00
9 Membuat Bak Kontrol 0,25 x 0,25 1.00 bh 530,000.00 530,000.00
10 Cor Beton Penutup Saluran + Pembesian 4.12 m3 3,131,960.52 12,914,639.20
11 Pembuatan Bekisting 38.79 m2 314,881.50 12,214,253.39
JUMLAH B 43,550,646.97
JUMLAH TOTAL (A + B ) 46,550,646.97
PPN 10% 4,655,064.70
JUMLAH TOTAL + PPN 10% 51,205,711.67
DIBULATKAN 51,205,000.00

UNGARAN,
CV. CIPTA KARYA MANDIRI

MUH ZULHAM NURSALIM, SH


Direktur
REKAPITULASI ANGGARAN BIAYA

PEKERJAAN : REHAB PELEBARAN JALAN KANTOR PP-PAUD DAN DIKMAS JAWA TENGAH
LOKASI : KANTOR PP-PAUD DAN DIKMAS JAWA TENGAH
TAHUN ANGARAN : 2020

NO URAIAN PEKERJAAN TOTAL HARGA


A PEKERJAAN PERSIAPAN 3,000,000.00
B REHAB SALURAN GEDUNG DIPONEGORO 43,550,646.97

JUMLAH TOTAL 46,550,646.97


PPN 10% 4,655,064.70
JUMLAH TOTAL + PPN 10% 51,205,711.67
DIBULATKAN 51,205,000.00

UNGARAN,
CV. CIPTA KARYA MANDIRI

MUH ZULHAM NURSALIM, SH


Direktur
Jl. Panjaitan II No. 13 Ungaran Timur Kabupaten Semarang
Telp. (024) 6925771

RENCANA ANGGARAN BIAYA


PEKERJAAN : REHAB SALURAN DEPAN RUMAH DINAS KEPALA
LOKASI : KANTOR PP-PAUD DAN DIKMAS JAWA TENGAH
TAHUN ANGARAN : 2020

NO URAIAN PEKERJAAN VOLUME HARGA SATUAN JUMLAH HARGA TOTAL HARGA

A PEKERJAAN PERSIAPAN
1 Uitzet Lapangan 1.00 Ls 500,000.00 500,000.00
2 Pembersihan Lapangan 1.00 Ls 500,000.00 500,000.00
3 Buang Bongkaran Keluar Lokasi 1.00 Ls 2,000,000.00 2,000,000.00
JUMLAH A 3,000,000.00
B REHAB SALURAN DEPAN RUMAH DINAS KEPALA
1 Bongkar Plat Beton Existing 2.93 m3 1,109,750.00 3,246,018.75
2 Bongkar Rabat Beton 5.00 m3 1,019,820.00 5,101,139.64
3 Bongkar Kansten 0.66 m3 607,579.50 403,299.12
4 Bongkar Pondasi Saluran Sedalam 5cm 0.20 m3 855,082.50 168,023.71
5 Penggalian Tanah 34.10 m3 70,495.00 2,404,020.49
6 Urugan Pasir 1.26 m3 384,962.50 485,052.75
7 Membuat Pondasi Saluran 8.82 m3 1,212,243.75 10,691,989.88
8 Plesteran 55.38 m2 94,753.10 5,247,426.68
9 Acian 74.58 m2 54,165.00 4,039,625.70
10 Beton Lantai Saluran 0.91 m3 1,136,943.80 1,029,434.40
11 Membuat Bak Kontrol 0,70 x 0,70 1.00 bh 700,000.00 700,000.00
12 Membuat Grill Besi Plat 2mm 5.00 m1 490,000.00 2,450,000.00
13 Cor Beton Penutup Saluran + Pembesian 4.39 m3 3,131,960.52 13,741,476.77
14 Pembuatan Bekisting 37.63 M2 314,881.50 11,848,990.85
JUMLAH B 61,556,498.73
JUMLAH TOTAL (A + B) 64,556,498.73
PPN 10% 6,455,649.87
JUMLAH TOTAL + PPN 10% 71,012,148.60
DIBULATKAN 71,012,000.00

UNGARAN,
CV. BINA SERASI

Sofa Navarawal Zamzama


Direktur
REKAPITULASI ANGGARAN BIAYA

PEKERJAAN : REHAB SALURAN DEPAN RUMAH DINAS KEPALA


LOKASI : KANTOR PP-PAUD DAN DIKMAS JAWA TENGAH
TAHUN ANGARAN : 2020

NO URAIAN PEKERJAAN TOTAL HARGA


A PEKERJAAN PERSIAPAN 3,000,000.00
B REHAB SALURAN DEPAN RUMAH DINAS KEPALA 61,556,498.73

JUMLAH TOTAL 64,556,498.73


PPN 10% 6,455,649.87
JUMLAH TOTAL + PPN 10% 71,012,148.60
DIBULATKAN 71,012,000.00

UNGARAN,
CV. BINA SERASI

Sofa Navarawal Zamzama


Direktur
RENCANA ANGGARAN BIAYA
PEKERJAAN : REHAB PELEBARAN JALAN KANTOR PP-PAUD DAN DIKMAS JAWA TENGAH
LOKASI : KANTOR PP-PAUD DAN DIKMAS JAWA TENGAH
TAHUN ANGARAN : 2020

NO URAIAN PEKERJAAN VOLUME HARGA SATUAN JUMLAH HARGA TOTAL HARGA

A PEKERJAAN PERSIAPAN
1 Uitzet Lapangan 1.00 Ls 500,000.00 500,000.00
2 Pembersihan Lapangan 1.00 Ls 500,000.00 500,000.00
3 Buang Bongkaran Keluar Lokasi 1.00 Ls 2,000,000.00 2,000,000.00
JUMLAH A 3,000,000.00
B REHAB SALURAN GEDUNG DIPONEGORO
1 Bongkar Plat Beton Existing 2.75 m3 1,109,750.00 3,050,702.75
2 Bongkar Kansten Pasangan Bata 1.00 m3 607,579.50 608,582.01
3 Bongkar Pondasi Saluran Sedalam 5cm 0.50 m3 855,082.50 429,678.96
4 Bongkar Rabat Beton Taman 0.72 m3 1,019,820.00 734,270.40
5 Plesteran 60.60 m2 94,753.10 5,742,037.86
6 Acian 79.19 m2 54,165.00 4,289,326.35
7 Beton Lantai Saluran 0.58 m3 1,136,943.80 662,156.07
8 Membuat Grill Besi Plat 2mm 5.25 m1 475,000.00 2,493,750.00
9 Membuat Bak Kontrol 0,25 x 0,25 1.00 bh 530,000.00 530,000.00
10 Cor Beton Penutup Saluran + Pembesian 4.12 m3 3,131,960.52 12,914,639.20
11 Pembuatan Bekisting 38.79 m2 314,881.50 12,214,253.39
JUMLAH B 43,669,396.97
C REHAB SALURAN DEPAN RUMAH DINAS KEPALA
1 Bongkar Plat Beton Existing 2.93 m3 1,109,750.00 3,246,018.75
2 Bongkar Kansten Pasangan Bata 0.66 m3 607,579.50 403,299.12
3 Bongkar Pondasi Saluran Sedalam 5cm 0.20 m3 855,082.50 168,023.71
4 Plesteran 43.96 m2 94,753.10 4,165,346.28
5 Acian 57.45 m2 54,165.00 3,111,779.25
6 Beton Lantai Saluran 0.62 m3 1,136,943.80 699,720.69
7 Membuat Grill Besi Plat 2mm 5.00 m1 475,000.00 2,375,000.00
8 Membuat Bak Kontrol 0,75 x 0,75 1.00 Ls 852,000.00 852,000.00
9 Cor Beton Penutup Saluran + Pembesian 4.39 m3 3,131,960.52 13,741,476.77
10 Pembuatan Bekisting 35.95 M2 314,881.50 11,319,989.93
JUMLAH C 40,082,654.50
JUMLAH TOTAL (A + B + C) 86,752,051.47
PPN 10% 8,675,205.15
JUMLAH TOTAL + PPN 10% 95,427,256.62
DIBULATKAN 95,427,000.00

UNGARAN,
CV. CIPTA KARYA MANDIRI

MUH ZULHAM NURSALIM, SH


Direktur
RENCANA ANGGARAN BIAYA

PEKERJAAN : REHAB HALAMAN GEDUNG DIPONEGORO


LOKASI : KANTOR PP-PAUD DAN DIKMAS JAWA TENGAH
TAHUN ANGARAN : 2019

NO URAIAN PEKERJAAN VOLUME HARGA SATUAN JUMLAH HARGA TOTAL HARGA

A PEKERJAAN PERSIAPAN
1 Uitzet Lapangan 1.00 Ls 500,000.00 500,000.00
2 Pembersihan Lapangan 1.00 Ls 500,000.00 500,000.00
JUMLAH A 1,000,000.00
B REHAB HALAMAN GEDUNG DIPONEGORO
1 Bongkaran Rabat Beton Existing 1.66 m3 1,109,750.00 1,847,095.64
2 Buang Bongkaran Keluar Lokasi 1.00 Ls 1,000,000.00 1,000,000.00
4 Pemasangan Keramik Lantai 40x40 cm 33.29 m2 272,253.44 9,062,908.76
3 Pemasangan Plint Kramik lebar 10cm 2.17 m2 57,734.60 124,995.41
5 Perbaikan Bak Kontrol 1.00 Ls 750,000.00 750,000.00
JUMLAH B 12,784,999.82
JUMLAH TOTAL (A + B) 13,784,999.82
PPN 10% 1,378,499.98
JUMLAH TOTAL + PPN 10% 15,163,499.80
DIBULATKAN 15,163,000.00

UNGARAN,
CV. CIPTA KARYA MANDIRI

MUH ZULHAM NURSALIM, SH


Direktur
REKAPITULASI ANGGARAN BIAYA

PEKERJAAN : REHAB HALAMAN GEDUNG DIPONEGORO


LOKASI : KANTOR PP-PAUD DAN DIKMAS JAWA TENGAH
TAHUN ANGARAN :

NO URAIAN PEKERJAAN TOTAL HARGA


A PEKERJAAN PERSIAPAN 3,000,000.00
B REHAB HALAMAN GEDUNG DIPONEGORO 12,784,999.82

JUMLAH TOTAL 15,784,999.82


PPN 10% 1,578,499.98
JUMLAH TOTAL + PPN 10% 17,363,499.80
DIBULATKAN 17,363,000.00

UNGARAN,
CV. CIPTA KARYA MANDIRI

MUH ZULHAM NURSALIM, SH


Direktur
PERINCIAN PEKERJAAN SATUAN HARGA
Upah Pekerja
Administrasi Org/Hari 75,000
Ass Driller Org/Hari 80,000
Crew Driller Org/Hari 75,000
Crew Local Org/Hari 68,000
Crew Pengeboran Org/Hari 75,000
Driller Org/Hari 85,000
Geologis Org/Hari 90,000
Juru Gambar Bangunan m² Bangunan. Org/Hari 68,000
Kepala Tukang Org/Hari 95,000
Koordinator Org/Hari 95,000
Mandor Org/Hari 100,000
Masinis Org/Hari 90,000
Mekanik Terlatih Org/Hari 90,000
Operator Semi Terlatih Org/Hari 80,000
Operator Terlatih Org/Hari 90,000
Pekerja/Buruh Org/Hari 75,000
Pembantu Masinis Org/Hari 75,000
Pembantu Operator Org/Hari 75,000
Penganyam Bronjong Org/Hari 90,000
Penjaga Malam Org/Hari 75,000
Sopir (Proyek) Org/Hari 90,000
Sopir Angkutan Orang Org/Hari 90,000
Tukang Batu Org/Hari 90,000
Tukang Besi Org/Hari 90,000
Tukang Cat Org/Hari 90,000
Tukang Kayu Org/Hari 90,000
Tukang Leideng Org/Hari 90,000
Tukang Listrik Org/Hari 90,000
Tukang Masak Aspal/Juru Godog Org/Hari 75,000
Tukang Plitur Org/Hari 90,000
KETERANGAN
NAMA BARANG SPESIFIKASI

T BAHAN BANGUNAN
Abu Batu
Air
Air
Alat-alat kerja / Alat bantu :
- Pekerjaan jalan

- Pekerjaan tanah

- Pekerjaan pasangan

- Pekerjaan perpipaan

Agregat Kasar
Agregat Halus
siler/cat dasar tembok interior
Aluminium plat BJLS 30
Amplas Besi
Amril / amplas
Asbes gel. Kecil 0,9 m x 2,10 m
Asbes gel. Kecil 0,9 m x 2,40 m
Asbes gel. Kecil 0,9 m x 2,90 m
Asbes gel. Kecil 1,05 m x 2,10 m
Asbes gel. Kecil 1,05 m x 2,40 m
Asbes gel. Kecil 1,05 m x 3,00 m
Asbes gel. Besar 1,02 m x 2,10 m
Asbes gel. Besar 1,02 m x 2,40 m
Asbes gel. Besar 1,02 m x 3,00 m
Asbes Kerpus Gel. 1,0 m x 1,0 m
Asbes Plat/ eternity 1,0 m x 1,0 m
Asbes gel. Besar 1,02 m x 3,00 m
Asbes Kerpus Gel . 1,0 m x 1,0 m
Asbes Plat/ eternity 1,0 m x 1,0 m
Aspalt penetrasi 60/70
Aspalt Treated base (ATB) / AC-BC
Aspalt Treated base (ATB) / AC-WC
Aspalt Treated base (ATB) / AC-WC
Latasir
Baja Profil (struktur)
Baja Plat
Bak Kontrol 21x31,5x38
Bambu Ø 8-10 cm p = 4 m
Bambu Ø 10-12 cm p = 4 m
Bataco 40 x 20 x 10 cm
Batang kelapa 4m
Batu apung
Batu Bata biasa
Batu blondhos
Batu candi 30 x 30
Batu koral sikat
Batu Kerikil sungai (tersaring)
Batu muka
Batu Palimanan
Batu andesit bakar
Batu lempeng
Batu serat hitam
Batu pecah 0,5/1 (pecah mesin) ( chip )
Batu pecah 1/2 (pecah mesin)
Batu pecah 2/3 (pecah mesin)
Batu pecah 3/5 (pecah mesin)
Batu pecah 4/6 (pecah tangan)
Batu pecah 5/7 (pecah tangan)
Batu belah / pecah 7/10 - 10/15 - 15/20
Batu belah/pecah besar
Besi Baja Ringan atap bentg 9-12m Zincalum
Besi beton polos SNI
Besi beton ulir SNI
Besi Profil C
Baja IWF
Besi Profil Siku
Besi sengkang (angkur, baut)
Besi strip plat t= 2 mm
Besi strip 0,5 cm
Besi teralis/strip plat (Terpasang)
Bottom Patch Fitting
Bottom / Top Lock Fitting
Bronjong fabrikasi 2,7m

Bronjong fabrikasi 3,0 m

Sesek bambu
BRC t = 120 x 240 cm Galvanis Ø 6mm
BRC t = 150 x 240 cm Galvanis Ø 6mm
BRC t = 120 x 240 cm Galvanis Ø 8mm
BRC t = 150 x 240 cm Galvanis Ø 8mm
BRC (tiang t = 120 ) Galvanis
BRC (tiang t = 150 ) Galvanis
Cat besi
Cat brom
Cat Kayu
Cat Meni
Cat Tembok interior
Cat Tembok interior
Cat Tembok exterior
Cat Tembok exterior
Cat Waterproof
Cat Thermoplastic
Coating batu alam
Dempul Plamur kayu
Door Closer
Door Stop
Elastomer
Expansion joint type 1 5 x 6 x 25 cm
Expansion joint type 2 5 x 10 x 25 cm
Expansion joint Type 3 5 x 5 x 25 cm
Engsel Kupu-kupu biasa
Engsel Nylon Pintu
Espanyolet
Eternit 1 x 1 m
Floor Drain
Flush Bolt
Fiberglass Septictank Bio Filter Kap. 2-4 Org
Fiberglass Septictank Bio Filter Kap. 4-6Org
Fiberglass Septictank Bio Filter Kap. 6-8 Org
Fiberglass Septictank Bio Filter Kap. 8-10 Org
Fixed Top Pin
Floor Hinges
Floor Deck / Bondek t = 0.70 - 1000 mm
Floor Deck / Bondek t = 0.75 - 1000 mm
Floor Deck / Bondek t = 1.00 - 1000 mm
Flinkote
Folding gate PVC (terpasang) DN 40 cm, panjang 1 meter
Folding gate 0.4
Folding gate besi 0.8 terpasang
Formica
Formite/spacer
Genteng Kerpus Metal Lapis Pasir
Genteng Kerpus Metal Polos
Genteng Kerpus tanah (5 bh/m) ex.Kebumen
Genteng tanah liat Kebumen (biasa) kerpus plentong
Genteng tanah liat Kebumen (biasa) kerpus kodok
Genteng tanah liat Lokal kerpus plentong
Genteng tanah liat Lokal kerpus kodok
Genteng Kerpus beton natural (3 bh/m)-Gt.9
Genteng Kerpus beton natural (3 bh/m)-Gt.11
Genteng tanah liat Jatiwangi (biasa) kerpus plentong
Genteng tanah liat Jatiwangi (biasa) kerpus kodok
Genteng tanah liat Jatiwangi (glasur) kerpus plentong
Genteng tanah liat Jatiwangi (glasur) kerpus kodok
Genteng beton natural (9bh/m2)
Genteng beton natural (11bh/m2)
Genteng beton cat (9bh/m2)
Genteng beton kerpus (3bh/m2)
Genteng Keramik
Genteng sirap
Genteng Metal t = 0,35 mm
Genteng tanah liat Kebumen kodok (25 bh/m2)
Genteng tanah liat Kebumen (biasa) plentong (25 bh/m2)
Genteng tanah liat Kebumen (biasa) plentong (18 bh/m2)
Genteng tanah liat Kebumen (biasa) plentong (14 bh/m2)
Genteng tanah liat Lokal Kodok (25 bh/m2)
Genteng tanah liat Lokal plentong (25 bh/m2)
Genteng tanah liat Lokal plentong (18 bh/m2)
Genteng tanah liat Lokal plentong (14 bh/m2)
Genteng tanah liat Jatiwangi (biasa) Kodok (25 bh/m2)
Genteng tanah liat JAtiwangi (biasa) plentong (25 bh/m2)
Genteng tanah liat Jatiwangi (biasa) plentong (18 bh/m2)
Genteng tanah liat Jatiwangi (biasa) plentong (14 bh/m2)
Genteng tanah liat Jatiwangi (glasur) Kodok (25 bh/m2)
Genteng tanah liat Jatiwangi (glasur) plentong (25 bh/m2)
Genteng tanah liat Jatiwangi (glasur) plentong (18 bh/m2)
Genteng Kaca plentong 5 mm
Genteng gelombang bitumen
Glass Bit
Grass block 20 x 20
Grass block lubang kotak (K-300)
Gorong-gorong DN 20 cm , panjang 1 meter
Gorong-gorong DN 30 cm, panjang 1 meter
Gorong-gorong DN 40 cm, panjang 1 meter
Gorong-gorong DN 50 cm , panjang 1 meter
Gorong-gorong DN 60 cm, panjang 1 meter
Gorong-gorong DN 70 cm, panjang 0,5 meter
Gorong-gorong DN 80 cm, panjang 0.5 meter
Gorong-gorong DN 100 cm panjang 0.5 meter
Got Type U - 15 cm, panjang 1 m
Got Type U - 20 cm, panjang 1 m
Got Type U - 30 cm, panjang 1 m
Got Type U - 40 cm, panjang 1 m
Grendel Biasa
Guard Rail
Handle / Pegangan pintu (kecil)
Handle / Pegangan pintu (besar)
Hot roller sheet (HRS)
Ijuk
Kaca bening 3 mm
Kaca bening 5 mm
Kaca es/dop
Kaca raindown
Kaca ryben 5 mm
Kanstein Batako 10 x 20 x 50
Kanstein Lubang 10/12,5 x 25 x 50
Kanstein Standar 10/12,5 x 25 x 50
Kanstein Lubang K200 ukuran 10/12,5 x 30 x 50
Kanstein Standar K200 ukuran 10/12,5 x 30 x 50
Kanstein Standar K200 ukuran 15/20 x 30 x 50
Kanstein Lubang K200 ukuran 15/20 x 30 x 50
Kanstein Lubang K300 ukuran 15/20 x 30 x 50
Kanstein Standar K300 ukuran 15/20 x 30 x 50
Kanstein Lubang
Kanstein Standar
Kanstin Sirip 15/20 x 35 x 50
Kanstein Standar 13/16 x 28 x 50
Kapur pasang
Kapur pasang
Karung banjir 50 kg

Kawat beton/Bendrat
Kawat Bronjong Galvanis
Kawat duri (50 m)
Kawat harmonika 12 x 45 mm
Kawat harmonika 12 x 24 mm
Kawat harmonika 14 x 30 mm
Kawat harmonika 14 x 35 mm
Kawat harmonika 53 X 53 X 10 mm
Kawat kasa besi
Kawat kasa plastik
Kawat las listrik
Kayu bakar
Kayu bengkirai (balok)
Kayu bengkirai (papan)
Kayu bengkirai 2/3
Kayu bengkirai 3/5
Kayu bengkirai 5/7
Kayu cetakan
Kayu dolok DN / Dolken 8-10 cm

Kayu Jati (balok) Kw.II


Kayu Jati papan KW II
Kayu Jati Kw.I
Kayu kamfer (balok)
Kayu Kamfer (papan)
Kayu kamfer 2/3
Kayu kamfer 3/5
Kayu kamfer 5/7
Kayu Kruing (Balok)
Kayu Kruing (papan)
Kayu Kruing 2/3
Kayu Kruing 3/5
Kayu Kruing 5/7
Kayu Meranti (Balok)
Kayu Meranti (papan)
Kayu Meranti 2/3
Kayu Meranti 3/5
Kayu Meranti 5/7
Kayu Lanan/Tahun papan
Kayu Lanan/Tahun Balok 8/12
Kayu Lanan/Tahun Balok 6/12
Kayu Lanan/Tahun Usuk 5/7
Kayu Lanan/Tahun Usuk 4/6
Kayu Lanan/Tahun Reng 3/5
Kayu Lanan/Tahun Reng 2/3
Kayu Sengon Balok 8/12
Kayu Sengon Balok 6/12
Kayu Sengon Usuk 5/7
Kayu Sengon Usuk 4/6
Kayu Sengon Reng 3/5
Kayu Sengon Reng 2/3
Kayu Sengon Papan
Kerb sudut Taman 30x20x50
Kerb Taman 25x16x21
Kerb Taman 30x20x50
Kerb Taman 20/40 x 30 x 25
Kloset duduk lengkap

Kloset jongkok

Kuas cat

Kuas cat 3 inchi

Kuas cat 4 inchi

Rol cat

Kunci tanam 2x Slog (kecil)

Kunci tanam 2x Slog (besar)

Kunci Tanam 2x Slog sekualitas Kuda


Kunci tanam 2x Slog sekualitas Nanking
Kunci Tanam putar Kamar mandi
Kusen aluminium 3" hitam 0.40 mm
Kusen aluminium 3" silver 0.40 mm
Kusen aluminium 4" coklat 0.40 mm
Kusen aluminium 4" silver 0.40 mm
Kusen aluminium 4" hitam 0.40 mm
Kusen dan daun pintu KM PVC komplit kunci
Pintu UPVC (putih)
Pintu UPVC (motif)
Latasir
Lem kayu
Lem kuning AICA AIBON
Lem Pralon 0.5 liter / kaleng
Lis Gipsum 12 cm
Lis Gipsum 7 cm
Lis Gipsum 9 cm
Lis kayu profil
LPA
LPA Klas B
LPB
Lubang Bak Kontrol (lubang) 21x31,5x8
Lubang Bak Kontrol (lubang) 22x33x8
Lubang Bak Kontrol (Standar) 22x33x8
Minyak cat/super tiner
Minyak Oli/Pelumas
Multiplek 120 x 240 x 9 mm
Multipleks tb.12mm
Multipleks tb.6mm
Mur/baut untuk jembatan baja
Nok kerpus tanah liat
Nok steel gelombang besar 108 cm
Nok steel gelombang kecil 105 cm
Over panel pivot patch fitting
Over panel
Paku
Paku asbes
Paku crampon
Paku kait lengkap
Paku kayu
Paku payung
Paku sekrup
Partisi Gipsum Metal Furring
Partisi Gipsum rangka Galvanis
Partisi Gipsum rangka Hollow 2 swisi
Paser Slot jendela
Pasir beton/ pasang
Pasir pasang muntilan
Pasir urug
Paving 6 cm 29 bh/M²K.135 Ukuran 11,5x6
Paving 6 cm 29 bh/M²K.225 Ukuran 11,5x6
Paving 8 cm 29 bh/M²K.180 Ukuran 11,5x8
Paving 8 cm 29 bh/M²K.225 Ukuran 11,5x8
Paving block natural 8cm
Paving block warna 6cm
Paving block warna 8cm
Paving Hexagona Besar 17,5x6
Paving Hexagona Besar 17,5x8
Paving Hexagonal L 10x6
Paving Hexagonal L 10x8
Paving Hexagonal S 10x6
Paving Holland 10,5x21x6
Paving Holland 10,5x21x8
Paving Holland 10,5x21x10
Paving L Blok 10,5x15,75x6
Paving L Blok ,5x15,75x8
Paving Oktagonal 17,5x6
Paving Square 10x10x6
Paving Square 10,5x10,5x6
Paving Square 12x12x6
Paving Square 12x12X8
Paving Square 16x16x6
Paving Square 16x16x8
Paving Std Grass Block 48x10
Paving Std Grass Block 40x10
Paving Topi uskup, 67 bh/M² 67 bh/M²
Paving Trapez 17,5x8 17,5x8
Paving Trapez 17,5x10 17,5x10
PC / Cement (40 Kg)
PC / Cement
PC / Semen putih (40 kg)
PC / Semen warna
Rambuncis
Semen Instant MU 380 - Perekat Bata Ringan
Semen Instant MU 100 - Plesteran
Semen Instant MU 200 - Acian
Pipa Tanah Ø 20 cm
Pipa Tanah Ø 15 cm
Plafon Gipsum Furring
Plafon Gipsum rangka Galvanis
Plafon Gipsum rangka Hollow
Plafon Calsiboard rangka Hollow
Plafond Metal Furing
Plafond Rangka Galvanis
Plafond Rangka Hollow
Plamir tembok
Plat Baja Eser
Plitur
Plywood tb.9mm

Profil Kaca 25 x 25 cm (PC)


Profil Allumunium 30 x 30 cm (PC)
Ramset
Recorder peper
Reel pintu dorong ( Terpasang )

Roll cat
Rolling door (terpasang)
Rooster 10 x 20 cm (PC)

Rooster 15 x 25 cm (PC)

Rooster 15 x 30 cm (PC)

Rooster 20 x 20 cm (PC)

Rooster 25 x 25 cm (PC)

Rooster 30 x 30 cm (PC)

Seng gelombang BJLS 20, panjang 180 cm x 85 cm


Seng gelombang BJLS 20, panjang 210 cm x 85 cm

Seng gelombang BJLS 20, panjang 240 cm x 85 cm

Seng gelombang BJLS 20, panjang 300 cm x 85 cm

Seng plat BJLS 20 x 90 cm


Seng plat BJLS 30 x 60 cm
sidik Jendela
Sidik pintu
Sirlak
Sirtu
Soda Api
Solar
Spiritus
Taek wood 90 x 210 x 4 mm

Taek wood 90 x 210 x 9 mm

Tali Ijuk
Tanah Lempung
Tanah Padas
Tanah urug
Teer
Tendon (Kabel baja jembatan)/Sling 5/8" 5/8"
Tendon (Kabel baja jembatan)/Sling 3/4" 3/4"
Tendon (Kabel baja jembatan)/Sling 7/8" 7/8"
Tendon (Kabel baja jembatan)/Sling 1" 1"
Tendon (Kabel baja jembatan)/Sling 20 mm 20 mm

Triplek 120 x 240 x 5 mm

Triplek 120 x 240 x 9 mm

Triplek 120 x 240 x 18 mm

Teakblock 120 x 240 x 18 mm

Keramik dinding 10 x 20
Keramik dinding 20 x 25
Keramik dinding 25 x 40
Ubin keramik 6 X 20 (lis keramik)

Ubin keramik 10 x 20 (polos)


Ubin keramik 10 x 20 (motif)
Ubin keramik 20 x 20 (polos)
Ubin keramik 20 x 20 (motif)
Ubin keramik 30 x 30 (polos)
Ubin keramik 30 x 30 (motif)
Ubin keramik 40 x 40 (polos)
Ubin keramik 40 x 40 (motif)
Ubin keramik 60 x 60 (motif)
Ubin Granit 60 x 60 (polos)
Ubin Granit 60 x 60 (motif)
Ubin Granit 80 x 80 (polos)
Ubin Granit 80 x 80 (motif)
Plint Keramik
Plint Keramik 10X10
Marmer 100x100
Urinoir
Ubin Granit 60 x 60
Lantai Parquet
Lantai Vinyl
Ubin defebel

Ubin anti sleep

Veet
Wastafel INA
Wood tiller ex.IMPRA
Zinc washbak
U-ditch Uk. 60x100x120 cm
Cover HD Uk. 74 x 120 cm, tbl. 15 cm
U-ditch Uk. 80x100x120 cm
Cover HD Uk. 94 x 120 cm, tbl. 15 cm
Box Culvert Uk. 80 x 80 x 120 cm, tbl. 15 cm

Alumunium composit Panel tbl panel 4 mm ,alumunium = 0.3 mm


Atap Onduline
Atap Galvalume warna natural
Atap Galvalume fin. Warna
Besi hollow 40.40.4 (2 mm), Pjg 4 m

Besi hollow 30.30.3 (2 mm),, Pjg 4 m

Besi hollo 20.40.4 (2 mm) , Pjg 4 m

Bata Ringan ex Hebbel Uk. 10 x 20 x 60 cm (isi 83 buah/m3)


Bondex M10 uk. 2,1 x 5,4 x 0,75

Fiberglass septictank ex Biofill kpasitas 1000 lt


Fiberglass septictank ex Biofill kpasitas 1850 lt
Pagar panel precast ex Arcon t=2m ( terpasang )
Usuk dan reng baja ringan t = 0,75 mm (terpasang)
Usuk dan reng baja ringan t = 1 mm (terpasang)
wiremesh M6 Uk. 2,1x5,4

wiremesh M7 Uk. 2,1x5,4


wiremesh M8 Uk. 2,1x5,4

wiremesh M10 Uk. 2,1x5,4

Pengecatan Epoxy
Epoxy coating tebal 200 mikron
Epoxy coating tebal 300 mikron
Epoxy coating tebal 500 mikron
Epoxy coating tebal 1000 mikron
Hebbel
Ukuran 7,5 x 20 x 60 cm (isi 111 buah/m3)

Ukuran 10 x 20 x 60 cm (isi 83 buah/m3)

Bahan Untuk Trotoar dan RTH


U-ditch / Yudit 40 x 40 x 120 = 60 mm
U-ditch / Yudit 40 x 50 x 120 = 60 mm
U-ditch / Yudit 40 x 60 x 120 = 60 mm
U-ditch / Yudit 50 x 50 x 120 = 70 mm
U-ditch / Yudit 50 x 60 x 120 = 70 mm
U-ditch / Yudit 50 x 70 x 120 = 70 mm
U-ditch / Yudit 50 x 50 x 120 = 100 mm
U-ditch / Yudit 50 x 60 x 120 = 100 mm
U-ditch / Yudit 50 x 70 x 120 = 100 mm
U-ditch / Yudit 60 x 60 x 120 = 70 mm
U-ditch / Yudit 60 x 70 x 120 = 70 mm
U-ditch / Yudit 60 x 80 x 120 = 70 mm
U-ditch / Yudit 60 x 60 x 120 = 100 mm
U-ditch / Yudit 60 x 70 x 120 = 100 mm
U-ditch / Yudit 60 x 80 x 120 = 100 mm
U-ditch / Yudit 80 x 80 x 120 = 80 mm
U-ditch / Yudit 80 x 100 x 120 = 80 mm
U-ditch / Yudit 80 x 80 x 120 = 100 mm
U-ditch / Yudit 80 x 100 x 120 = 100 mm
Cover U-ditch 400 x 120 = 100 mm
Cover U-ditch 500 x 120 = 100 mm
Cover U-ditch 600 x 120 = 100 mm
Cover U-ditch 700 x 120 = 100 mm

Paving Dekoratif
Paving Dekoratif Garis Gruff 50 x 25 x 6 (K350)
Paving Dekoratif Difabel 30 x 30 x 6 (K350)
Paving Dekoratif Grass Block Motif 25 x 25 x 6 (K350)
Paving Dekoratif BLINDHOLD 30 x 30 x 6 (K350)
Paving Dekoratif Holland Polos 25 x 12,5 x 6 (K300-450)
Paving Dekoratif AROUND OF TRESS 50 x 50 (K350) (1 set 4 pcs)
Buis Beton Bulat Q 30 x 100 = 3 cm
Buis Beton Bulat Q 40 x 100 = 4 cm
Buis Beton Bulat Q 50 x 100 = 5 cm
Buis Beton Bulat Q 60 x 50 = 6 cm
Buis Beton Bulat Q 80 x 50 = 8 cm
Buis Beton Bulat Q 100 x 50 = 10 cm
Buis Beton Belah (1/2) Q 30 x 100 = 3 cm
U-Ditch 50 x 52/34 x 4/41 = 7 cm
U-Ditch 50 x 72/54 x 48/41 = 7 cm
U-Ditch 50 x 92/74 x 48/41 = 7 cm
Kanstein L 60 x 37 x 28 (K300)
Kanstein 60 x 10:20 x 40 (K300)
Kanstein S Kecil 49 x 34 x 7:14 (K300)
Kanstein S Besar 59 x 29 x 10.5:14.5 (K300)
Kanstein Besar / Kerb 60 x 30 x 20 (K300)
Kanstein Kecil / BTC Non Lock 40 x 20 x 10 (K300)
Kanstein Lock / BTC Lock 50 x 20 x 10 (K300)
Pagar Panel Beton Precast 160 m2 = 4 Lembar Panel 225x16x16 cm
Pagar Panel Beton Precast 200 m2 = 5 Lembar Panel 280x16x16 cm
Pagar Panel Beton Precast 240 m2 = 6 Lembar Panel 320x16x16 cm
Pagar Panel Beton Precast 280 m2 = 7 Lembar Panel 370x16x16 cm
Pagar Panel Beton Precast 320 m2 = 8 Lembar Panel 400x16x16 cm
Pagar L.5 Jalur 60 cm Siku 40x40x3 cm

Pagar Panel Beton Bertulang 240x40x5 cm

Pagar Panel Beton Bertulang 225x16x16 cm

Pagar Panel Beton Bertulang 280x16x16 cm

Pagar Panel Beton Bertulang 320x16x16 cm

Pagar Panel Beton Bertulang 370x16x16 cm

Pagar Panel Beton Bertulang 400x16x16 cm

Pintu air jenis angkat B = 0,3 m; H=0,5 m; H1=0,65 m; mk=0,55


Pintu air jenis angkat B = 0,4 m; H=0,5 m; H1=0,95 m; mk=0,55
Pintu air jenis sosrong baja B = 0,6 m; H=0,8m; H1=1,2 m; mk=0,8 m;
Pintu air jenis sosrong baja B = 0,8 m; H= 1,0m; H1=1,2 m; mk=0,8 m;
Pintu air jenis sorong baja dengan roda gigi B = 1,0 m; H=1,0m; H1=1,9 m; mk=0,8 m;
Pintu air jenis sorong baja dengan roda gigi B = 1,2 m; H=1,0m; H1=1,9 m; mk=0,8 m;
Pintu air jenis sorong baja dengan roda gigi B = 1,2 m; H=1,2 m; H1=2,7 m; mk=0,8 m;
Pintu air jenis sorong baja dengan roda gigi B = 1,5 m; H=1,2 m; H1=2,7 m; mk=0,8 m;

Bahan dan Alat Pintu Air (Bidang Pengairan) :


- Karet perapat/lem karet

- Plat penjepit karet

- Mur baut penjepit karet


- Pelumasan

- Roda gigi besar dan kecil , spei

- Dudukan roda gigi , mur baut

- Mur kuningan , bearing

- Stang drat

- Stang pemutar , dudukan stang pemutar

- Stel ring

- Cat dasar dan finish

- Kisdam

- Frame atas (dudukan blok)

- Frame vertical kanan kiri) + plat isi

- Frame dasar

- Plat peluncur

PEMBUATAN SUMUR UJI


- Mobilisasi dan demobilisasi
- Geolistrik 5 titik
- pasang, pembongkaran rig dan peralatan
proyek

- pembersihan lokasi & pembuatan Bak Lumpur


- papan nama proyek
- perijinan pengeboran

Depresiasi Mixer
Depresiasi peralatan logging
Depresiasi peralatan mesin
Depresiasi peralatan pengeboran
Depresiasi pompa injeksi
Depresiasi alat redeveloping
Liqoit Oil grundfose
Pemeliharaan sumur dan ME.

Beton Ready Mix BO


Beton Ready Mix K- 50
Beton Ready Mix K- 100
Beton Ready Mix K- 125
Beton Ready Mix K- 150
Beton Ready Mix K- 175
Beton Ready Mix K- 200
Beton Ready Mix K- 225
Beton Ready Mix K- 250
Beton Ready Mix K- 275
Beton Ready Mix K- 300
Beton Ready Mix K- 325
Beton Ready Mix K- 350
Beton Ready Mix K- 400
Beton Ready Mix FS- 45

PIPA PVC.SNI. S.10 SAMBUNGAN SC.


DN. 6"
DN. 5"
DN. 4"
DN. 3"
DN. 2"
DN. 1,5"
DN. 1"
DN. 3/4"
DN. 1/2"

PIPA PVC.SNI. S.10 SAMBUNGAN RR.


DN. 4"
DN. 3"
DN. 2"

PIPA PVC.SNI. S.12,5 SAMBUNGAN SC.


DN. 4"
DN. 3"
DN. 2"
DN. 1,5"

PIPA PVC.SNI. S.12,5 SAMBUNGAN RR.


DN. 4"
DN. 3"
DN. 2,5"
DN. 2
PIPA PVC.SNI. S.16 SAMBUNGAN SC.
DN. 4"
DN. 3"
DN. 2"

PIPA PVC.SNI. S.16 SAMBUNGAN RR.


DN. 3"
DN. 2"

PIPA PVC. RUCIKA. AW SAMBUNGAN SC.


DN. 8" , p = 4 m
DN. 6" , p = 4 m
DN. 4" , p= 4 m
DN. 3" , p= 4 m
DN. 2,5" , p= 4 m
DN. 2" , p= 4 m
DN. 1,5" , p= 4 m
DN. 1 1/4" , p= 4 m
DN. 1" , p= 4 m
DN. 3/4" , p= 4 m
DN. 1/2" , p= 4 m
PIPA PE. SDR. 17 ( PN.10 )
DN. 3"
DN. 2,5"
DN. 2"
DN. 1,5"
PIPA PE. SDR. 13,6 ( PN.12,5 )
DN. 3"
DN. 2,5"
DN. 2"
DN. 1,5"

PIPA GALVANIS GI. SNI ( Medium.A )


DN. 12"
DN. 10" p = 6m
DN. 8" p = 6m
DN. 6" p = 6m
DN. 4" p = 6m
DN. 3" p = 6m
DN. 2" p = 6m
DN. 1,5"
DN. 1"
DN. 3/4"
DN. 1/2"
PIPA GALVANIS MEDIUM B. SPINDO
DN. 6"
DN. 4"
DN. 3"
DN. 2"
DN. 1,5"
DN. 1"
DN. 3/4"
DN. 1/2"

PIPA STEELE SCHEDULE 40 DN.


DN. 6"
DN. 4"
DN. 3"

PIPA STEEL SCHEDULE 20 DN.


DN. 12"
DN. 10."
DN. 8"
DN. 6."
DN. 5"
DN. 4"
DN. 2"

JENIS STANLESS STILE OPEN AREA 1 S/D 1,5 mm


DN. 10"
DN. 8"
DN. 6."
DN. 4."
DN. 3."
DN. 2."

JENIS LOW CARBON OPEN AREA 1 S/D 1,5 mm


DN. 10"
DN. 8"
DN. 6"
DN. 4"
DN. 3"
DN. 2"

JENIS GALVANIS MEDIUM A OPEN AREA 2 S/D 3 mm


DN. 6"
DN. 4"
JENIS PVC STANDAR RUCIKA AW OPEN AREA 2 S/D 3 mm
DN. 8"
DN. 6"
DN. 5"
DN. 4"

Air valve DN 1/2" 1/2"


Bellmouth
Bend GIP 1 1/2"
Bend GIP 1"
Bend GIP 2"-45°
Bend GIP 2"-90°
Bend All Flange 2" - 90 o
Bend All Flange 3" - 90 o
Bend All Flange 4" - 45 o
Bend All Flange 4" - 90 o
Bend All Flange 2" - 45
Bend All Flange 3" - 45 o
Bend All Flange 4" - 45̊o
Bend All Flange GIP 3" - 45̊o
Bend All Flange GIP 3" - 90o
Bend All Flange GIP 4" - 90o
Bend PVC SC SNI 2"-45°
Bend PVC SC SNI 2"-90°
Bend PVC SNI RRJ 3"-90°
Bend Socket Spigot 2" - 45 o
Bend Socket Spigot 2" - 90 o
Bend Socket Spigot 3" - 90 o
Bentonite
Bok Meter
Cap PVC SC 1 1/2"
Cap PVC SC 1"
Cap PVC SC 1/2"
Chek Valve 1 1/2"
Chek Valve 2"
Clamp Sadle PVC 1 1/2 x 1/2"
Clamp Sadle PVC 1 1/2 x 3/4"
Clamp Sadle PVC 2 x 1/2"
Clamp Sadle PVC 3 x 1"
Coupling 1/2"
Coupling 3/4"
Double Niple 1 1/2"
Double Niple 2"
Double Niple 3/4"
Flange all threaded 1,5
Flange Steele Sambungan Las 2"
Flange Steele Sambungan Las 3"
Flange Steele Sambungan Las 4"
Floating Valve 3/4"
Foucet Socket PVC 1 1/2"
Gate Valve All Flange 3"
Gate Valve All Flange 4"
Gate Valve All Flange 2"
Gibboult Joint 2"
Gibboult Joint 3"
Gibboult Joint 4"
Knie GIP 1,5"
Knie GIP 1/2"
Knie GIP 2"
Knie GIP 3/4"
Knie PVC SC 1 1/2"
Knie PVC SC 1"
Knie PVC SC 1/2"
Knie PVC SC 2"
Kran air 1/2"
Kran air 3/4" (Besi)
Manometer 1/2" - 25 Kg/cm2
Pipa Udara /Air Vent 2".
Plug Kran 3/4"
Reducer all drad GI 2 x 1 1/2" ( VS.d )
Reducer all drad GI 3 x 2" ( VS.d )
Reducer all drad GI 4 x 2" ( VS.d )
Reducer all Flange CI 2 x 1 1/2"
Reducer all Flange CI 3 x 2"
Reducer all Flange CI 3 x 2"
Reducer GI 1 1/2" x 1"
Reducer GI 150 x 100
Reducer GI 2 x 1,5"
Reducer GI 2" x 1 "
Reducer PVC SNI SC 2 x 1 1/2"
Reducer PVC SNI SC 2 x 1"
Reducer PVC SNI SC 1 1/2 x 1"
Seal tape
Shock ND 1,5"
Shock ND 2"
Shock ND 3/4"
Stop Kran KITZ 1"
Stop Kran KITZ 1 1/2"
Stop Kran KITZ 2"
Stop Kran KITZ 3/4"
Strainer / Screener 2"
Strainer / Screener 3"
Strainer / Screener 4"
Street box 100" ( 4" )
Tangki Fibre Glass 2 m3
Tee All Flange 2 x 1 1/2"
Tee All Flange 2 x 2"
Tee All Flange 3 x 2"
Tee All Flange 3 x 3"
Tee All Flange 4 x 2"
Tee All Flange 4 x 3"
Tee All Flange 4 x 4"
Tee All Flange 2 X 2"
Tee Drat GIP 1 1/2 X 1 1/2"
Tee Drat GIP 2 X 2"
Tee PVC SC 1 1/2 x 1 1/2"
Tee PVC SC 1 1/2 x 1"
Tee PVC SC 1 x 1"
Tee PVC SC 1 x 1/2"
Tee PVC SC 2 x 2"
Tee PVC SC 3 x 2"
Tee PVC SC 4 x 2"
Valve Socket PVC 1 1/2"
Valve Socket PVC 1"
Valve Socket PVC 2"
Valve Socket PVC 3"
Wall Cuver 2 X 2"
Wall Cuver 6 X 2"
Wall Cuver 6X3"
Wall Cuver GI 4 x 1 1/2 "
Wall Cuver GI 4x2"
Wall Cuver GI 5 x 1 1/2 "
Wall Cuver GI 5x2"
Wall Cuver GI 6 x 1 1/2 "
Wall Cuver GI 6x2"
Wall Cuver GI 8x2"
Wall Pipa All Flange 3"
Wall Pipa All Flange 4"
Wall Pipa Galvanis 1 1/2" L. 0,5 m'
Wall Pipa Galvanis 2" L. 0.5 m'
Wall Pipa Galvanis 3" L. 0.5 m'
Water Meter All Flane 3"
Water Meter All Flnge 2"
Water Meter 1 1/2"
Water Meter 1"
Water Meter 3/4"
Water Moor 1,5"
Water Moor 2"
Water Moor 3/4"

PENGEBORAN
Centraliser
Depresiasi alat redeplopping
Depresiasi mixer
Depresiasi Peralatan logging
Depresiasi Peralatan mesin
Depresiasi Peralatan pengeboran
Depresiasi Pompa injeksi
Grevel
Kawat Las. RB. 26
Kawat Las. RB. 32
Liquid Oil Grundfose
Panel Pompa
Tiang Kabel

MOTOR POMPA 1 PHASE./ 1 X 220


Kapasitas 17 m3/jam
Kapasitas 17 m3/jam

MOTOR POMPA 3 PHASE./ 3 X 380


Kapasitas 3 m3/jam
Kapasitas 3 m3/jam
Kapasitas 3 m3/jam
Kapasitas 3 m3/jam
Kapasitas 3 m3/jam
Kapasitas 3 m3/jam

MOTOR POMPA 3 PHASE./ 3 X 380


Kapasitas 14 m3/jam
Kapasitas 14 m3/jam
Kapasitas 14 m3/jam
Kapasitas 14 m3/jam

MOTOR POMPA 3 PHASE./ 3 X 380


Kapasitas 17 m3/jam
Kapasitas 17 m3/jam
Kapasitas 17 m3/jam
Kapasitas 17 m3/jam
Kapasitas 17 m3/jam
Kapasitas 17 m3/jam
Kapasitas 17 m3/jam

MOTOR POMPA 3 PHASE./ 3 X 400


Kapasitas 5 m3/jam
Kapasitas 5 m3/jam
Kapasitas 5 m3/jam
Kapasitas 5 m3/jam
Kapasitas 5 m3/jam
Kapasitas 5 m3/jam
Kapasitas 5 m3/jam
Kapasitas 5 m3/jam

MOTOR POMPA 3 PHASE./ 3 X 400


Kapasitas 8 m3/jam
Kapasitas 8 m3/jam
Kapasitas 8 m3/jam
Kapasitas 8 m3/jam
Kapasitas 8 m3/jam

BAHAN INTERIOR
ACP (Alumunium Composite Panel) PVDF (0,3x1200x2440)mm
PVDF (0,3x1220x4880)mm
HPL (High Pressure Laminate) (1220x2440mm)/polos
(1220x2440mm)/motif
Wallpaper Merk Remember
Merk King / Queen
Hebel 60 x 20 x 10 cm
60 x 20 x 15 cm
60 x 20 x 20 cm
Horisontal Blind Merk Shinichi
Vertical Blind Merk Shinichi
Kain Gordyn Merk Lexus
Merk Raisha
Kain Vitrase Merk Lexus
Rollet Merk Tozan
Rell Gordyn Merk Tozan
Hook Marmer Merk Shinichi
Tosel Merk Tozan
Carpet Lantai Merk Crown
Lis Stainless steel
Lp. Sorot Halogen (kecil)
Indirect Light (LED Strip)
Kabel VGA P = 15 m
Stop Kontak Telephone
Stop Kontak Antena
Engsel Slowmotion
Acrylic 122 cm x 83 cm x 3mm
122 cm x 83 cm x 4mm
122 cm x 83 cm x 5mm
122 cm x 83 cm x 6mm
122 cm x 83 cm x 8mm
122 cm x 83 cm x 10mm
122 cm x 83 cm x 12mm
MDF / Particleboard 1220 x 2440 x 9 mm
1220 x 2440 x 15 mm
1220 x 2440 x 18 mm
Genteng Metal Roof Berpasir
Polos
Onduline (Aspal Bitumen) 90 x 200
Plang Papan Nama Kepemilikan Tanah bahan plat besi
Patok Batas Tanah Bahan cor
Prasasti bahan marmer ukuran 60 x 90 cm
Atap Galvanum
Kerpus Galvanum
Baut Roofing
Pelapis Anti Bocor
Listplastik
SATUAN HARGA

M3 245,000
M3 15,000
Ltr 150

Unit/jam 85,000

Unit/jam 36,000

Unit/jam 64,000

Unit/jam 4,000

M3 270,000
M3 197,000
Kg 50,000
M² 140,000
Lembar 5,000
Lembar 3,000
Lembar 62,700
Lembar 71,000
Lembar 86,100
Lembar 56,000
Lembar 63,000
Lembar 80,000
Lembar 65,400
Lembar 74,800
Lembar 93,500
Lembar 90,700
Lembar 110,000
Lembar 132,000
Lembar 30,500
Lembar 17,100
Kg 12,000
Ton 1,183,200
Ton 1,210,000
Ton 1,176,000
Ton 1,342,000
Kg 3,500
Kg 15,500
Buah 26,700
Batang 15,000
Batang 25,000
Buah 3,000
Batang 262,500
Kg. 17,000
Buah 850
M3 165,000
M2 137,500
M2 60,000
M3 146,800
M3 2,000
M3 132,000
M3 145,000
M3 70,000
M3 126,500
M3 350,000
M3 350,000
M3 350,000
M3 330,000
M3 285,000
M3 285,000
M3 360,000
M3 310,000
m2 264,000
Kg 10,000
Kg 10,000
Kg 11,000
Kg 11,000
Kg 11,000
Kg 21,000
Kg 11,000
Kg 25,300
M2 90,000
set 500,000
set 1,500,000
unit/m3 300,000

unit/m3 325,000

M2 10,000
Buah 231,000
Buah 385,000
Buah 425,000
Buah 508,000
Buah 118,800
Buah 86,500
Kg. 60,000
Kg. 65,000
Kg 60,000
Kg. 30,000
Kg 25,000
Kg 22,000
Kg 50,000
Kg 30,000
kg 55,000
Kg 145,100
Kg 70,000
Kg 16,600
Buah 330,000
Buah 45,000
Buah 615,000
m' 402,500
m' 517,500
m' 373,700
Buah 4,600
Buah 14,300
Buah 33,000
M2 20,000
Bh 72,000
Set 140,000
Unit 5,258,000
Unit 6,600,000
Unit 7,900,000
Unit 10,800,000
Set 200,000
Set 2,200,000
M² 113,000
M² 115,000
M² 171,000
Kg. 20,000
M² 850,000
M² 555,000
M² 625,000
Lembar 75,000
Buah 11,000
Buah 16,000
Buah 13,900
Buah 4,400
Buah 11,000
Buah 11,000
Buah 5,500
Buah 4,350
Buah 7,500
Buah 7,000
Buah 5,500
Buah 5,400
Buah 7,000
Buah 5,400
Buah 4,800
Buah 7,700
Buah 6,500
Buah 7,800
Buah 10,000
Buah 2,100
Buah 100,000
Buah 2,800
Buah 2,700
Buah 4,400
Buah 3,900
Buah 2,000
Buah 1,500
Buah 1,550
Buah 1,350
Buah 2,000
Buah 2,800
Buah 3,000
Buah 3,500
Buah 7,800
Buah 5,700
Buah 4,500
Buah 11,000
Lembar 160,000
Kg 2,650
Buah 20,000
Buah 15,500
Buah 49,500
Buah 71,000
Buah 82,500
Buah 110,000
Buah 143,000
Buah 132,000
Buah 145,000
Buah 247,000
Buah 33,000
Buah 44,000
Buah 55,000
Buah 71,500
Buah 10,000
m/kg 775,000
Buah 75,000
Buah 160,000
Ton 1,320,000
Kg 7,000
M2 82,500
M2 93,500
M3 120,000
M2 150,000
M2 100,000
bh 19,000
bh 26,500
bh 20,700
bh 28,000
bh 30,000
bh 48,000
bh 53,000
bh 55,000
bh 51,000
bh 29,000
bh 22,000
bh 34,150
bh 26,600
kg 6,600
M3 247,500
B 6,750
u
a
Kg 16,500
Kg 14,300
Rol 75,800
M' 63,900
M' 83,300
M' 54,400
M' 46,700
M' 93,400
M' 23,100
M2 14,250
Kg 25,650
M3 135,000
M3 11,800,000
M3 13,000,000
M3 6,800,000
M3 7,250,000
M3 8,750,000
M3 3,450,000
B 35,000
at
a
M3 22,550,000
M3 25,300,000
M3 29,000,000
M3 8,500,000
M3 10,000,000
M3 6,000,000
M3 6,000,000
M3 7,150,000
M3 6,400,000
M3 6,820,000
M3 6,325,000
M3 6,325,000
M3 6,600,000
M3 5,300,000
M3 6,000,000
M3 5,600,800
M3 5,600,800
M3 5,600,800
M3 4,100,000
M3 4,100,000
M3 3,615,000
M3 3,000,000
M3 3,000,000
M3 1,100,000
M3 1,100,000
M3 3,450,000
M3 3,450,000
M3 2,375,000
M3 2,375,000
M3 2,000,000
M3 1,200,000
M3 2,000,000
m' 44,000
m' 6,500
m' 44,000
m' 45,000
B 1,500,000
u
a
B 185,000
u
a
B 7,000
u
a
B 10,000
u
a
B 15,000
u
a
B 20,000
u
a
B 121,000
u
a
B 152,000
u
a
Buah 64,100
Buah 86,900
Buah 73,000
M' 75,000
M' 71,500
M' 93,500
M' 118,000
M' 120,000
Buah 300,000
Unit 1,050,000
Unit 1,320,000
Ton 1,465,000
Kg 98,000
Kg 47,700
Liter 32,000
m' 16,400
m' 12,000
m' 13,500
M' 6,800
M3 275,000
M3 223,000
M3 270,000
buah 11,700
buah 12,300
buah 12,300
Liter 20,000
Liter 30,000
Lembar 140,000
Lembar 167,000
Lembar 93,500
kg 26,000
Buah 6,500
Buah 46,500
Buah 30,500
Set 900,000
Set 1,300,000
Kg 15,000
Buah 8,500
Buah 10,750
Buah 3,200
Kg 17,000
Kg 22,000
Kg 11,800
M2 112,000
M2 104,000
M2 160,000
Buah 11,500
M3 380,000
M3 250,000 6250000
M3 143,000
m2 66,000
m2 75,000
m2 75,000
m2 85,800
M2 47,000
M2 35,000
M2 34,100
m2 72,500
m2 96,000
m2 96,750
m2 96,750
m2 72,500
m2 70,000
m2 95,000
m2 123,000
m2 73,000
m2 73,000
m2 75,000
m2 73,000
m2 84,500
m2 84,500
m2 97,000
m2 85,000
m2 97,000
m2 89,000
m2 86,500
M2 116,000
m2 100,000
m2 100,000
Zak 55,000
Kg 1,375
Zak 100,000
Kg 11,550
Set 40,000
Kg 42,000
Kg 1,600
Kg 4,300
Bh 13,200
Bh 10,500
M2 76,300
M2 74,500
M2 85,000
M² 120,000
m2 81,500
m2 75,000
m2 27,300
Kg 20,000
Kg 13,500
Liter 44,000
L 140,000
e
m
b
M' 6,000
M' 4,000
Bh 22,000
bh 24,000
B 105,000
u
a
bh 22,000
M² 105,000
B 12,600
u
a
B 13,200
u
a
B 11,300
u
a
B 11,700
u
a
B 14,000
u
a
B 16,500
u
a
le 48,400
m
b
le 50,000
m
b
le 56,000
m
b
le 68,000
m
b
m' 24,800
m' 22,000
bh 10,000
bh 10,000
Kg. 9,500
M3 242,000
kg 11,000
Liter 5,950
Liter 12,000
L 72,500
e
m
b
L 115,000
e
m
b
Kg 11,000
M3 49,500
M3 77,000
M3 71,500
ltr 23,000
M' 24,000
M' 35,000
M' 52,000
M' 61,000
L 43,000
e
m
b
L 83,200
e
m
b
L 126,500
e
m
b
L 295,000
e
m
b
L 340,000
e
m
b
M² 57,700
M² 58,900
M² 77,000
b 4,500
u
a
M² 37,500
M² 49,500
M² 57,300
M² 54,500
M² 46,300
M² 54,500
M² 51,800 0.12 0.96
M² 60,000
M² 137,500 17500
M² 245,000
M² 270,000
M² 250,000
M² 300,000
Bh 8,200
Bh 5,500
Bh 480,000
Bh 375,000
M² 187,000
M² 210,000
M² 495,000
b 40,000
u
a
b 60,000
u
a
Kg 24,400
bh 190,000
kg 33,000
bh 206,000
Unit 1,287,000
Unit 522,000
Unit 1,342,000
Unit 660,000
Unit 3,547,000

m2 665,500
m2 165,000
m2 63,200
m2 43,400
b 33,000
at
a
b 30,300
at
a
b 27,500
at
a
m3 913,000
le 42,900
m
b
bh 4,400,000
bh 4,730,000
m' 495,000
m2 85,200
m2 115,500
le 412,500
m
b
le 522,500
m
b
le 632,500
m
b
le 962,500
m
b

m2 132,000
m2 165,000
m2 209,000
m2 275,000

b 760,000
u
a
b 810,000
u
a

bh 495,000
bh 561,000
bh 627,000
bh 759,000
bh 836,000
bh 924,000
bh 1,061,500
bh 1,210,000
bh 1,298,000
bh 880,000
bh 968,000
bh 1,056,000
bh 1,265,000
bh 1,375,000
bh 1,485,000
bh 1,265,000
bh 1,430,000
bh 1,320,000
bh 1,815,000
bh 236,500
bh 308,000
bh 368,500
bh 489,500

m2 115,500
bh 44,000
bh 99,000
bh 44,000
m2 115,500
set 121,000
bh 66,000
bh 79,200
bh 106,700
bh 89,100
bh 118,800
bh 156,200
bh 51,700
bh 280,500
bh 396,000
bh 500,500
bh 69,300
bh 69,300
bh 41,800
bh 47,300
bh 63,800
bh 25,300
bh 30,800
bh 4,950
m 363,000
m 484,000
m 539,000
m 627,000
m 715,000
le 121,000
m
b
b 137,500
at
a
b 253,000
at
a
b 313,500
at
a
b 357,500
at
a
b 412,500
at
a
b 473,000
at
a

unit 2,500,000
unit 3,000,000
unit 10,800,000
unit 11,750,000
unit 24,730,000
unit 25,700,000
unit 43,650,000
unit 45,450,000

m 333.000,-
et
er
la
m 402.000,-
et
er
la
m 14.000,-
et
er
la
m 76.000,-
et
er
la
m 2.819.000,-
et
er
la
m 2.013.000,-
et
er
la
m 3.141.000,-
et
er
la
m 1.851.000,-
et
er
la
m
et
1.208.000,-
er
la
m 402.000,-
et
er
la

m 42.000,-
et
er
la
m 402.000,-
et
er
la
m 2.174.000,-
et
er
la
m 1.530.000,-
et
er
la
m 2.174.000,-
et
er
la
m 281.000,-
et
er
la

pkt 3.081.800,-
Ttk 1.542.000,-
pkt 2.293.400,-

pkt 938.000,-
pkt 361.500,-
pkt 2.409.500,-

unit 120.600,-
unit 962.600,-
unit 722.100,-
unit 1.082.300,-
unit 481.900,-
unit 2.391.400,-
liter 304.400,-
P 7.608.700,-
er
p
kt

M3 840,000
M3 912,000
M3 930,000
M3 948,000
M3 972,000
M3 990,000
M3 1,008,000
M3 1,032,000
M3 1,050,000
M3 1,074,000
M3 1,104,000
M3 1,116,000
M3 1,134,000
M3 1,182,000
M3 1,370,000

m' 266,000
m' 202,000
m' 125,000
m' 83,000
m' 41,000
m' 26,000
m' 14,000
m'
m'

m' 127,000
m' 85,000
m' 42,000

m' 82,000
m' 56,000
m' 27,000
m' 18,000

m' 84,000
m' 57,000
m' 52,000
m' 28,000
m' 67,000
m' 46,000
m' 23,000

m' 69,000
m' 46,000
m' 24,000

m' 340,000
m' 224,000
m' 127,000
m' 76,000
m' 56,000
m' 40,000
m' 25,000
m' 18,000
m' 15,000
m' 11,000
m' 9,000

m' 73,000
m' 51,000
m' 36,000
m' 23,000

m' 88,000
m' 62,000
m' 44,000
m' 28,000

m' 1,254,000
m' 894,000
m' 554,000
m' 298,000
m' 202,000
m' 138,000
m' 95,000
m' 59,000
m' 39,000
m' 30,000
m' 28,000

m' 156,000
m' 110,000
m' 84,000
m' 64,000
m' 34,000
m' 31,000
m' 29,000
m' 24,000

m' 440,000
m' 276,000
m' 261,000

m' 907,000
m' 765,000
m' 547,000
m' 372,000
m' 274,000
m' 151,000
m' 112,000

m'
m' 5,822,000
m' 3,812,000
m' 2,772,000
m' 2,218,000
m' 1,872,000

m'
m' 2,010,000
m' 1,179,000
m' 901,000
m' 693,000
m' 513,000

m' 385,000
m' 275,000

m' 375,000
m' 253,000
m' 164,000
m' 134,000

Buah 153,000
bh 55,000
Buah 38,000
Buah 44,000
Buah 59,000
Buah 71,000
Buah 222,000
Buah 499,000
Buah 585,000
Buah 585,000
Buah 222,000
Buah 499,000
Buah 274,000
Buah 263,000
Buah 274,000
Buah 301,000
Buah 28,000
Buah 33,000
Buah 110,000
Buah 13,000
Buah 39,000
Buah 46,000
Kg 10,000
Set. 44,000
Buah 24,000
Buah 9,000
Buah 3,000
Buah 92,800
Buah 219,000
Buah 54,000
Buah 54,000
Buah 69,000
Buah 69,000
Buah 22,000
Buah 28,000
Buah 15,000
Buah 17,000
Buah 9,000
Buah 39,000
Buah 28,000
Buah 55,000
buah 110,000
Buah 82,000
Buah 12,000
Buah 1,764,000
Buah 1,309,000
Buah 512,000
Buah 90,000
Buah 102,000
Buah 236,000
Buah 28,000
Buah 9,000
Buah 40,000
Buah 10,000
Buah 9,000
Buah 4,000
Buah 3,000
Buah 23,000
Buah 28,000
Buah 33,000
Buah 137,000
unit 110,000
Buah 39,000
Buah 22,000
Buah 82,000
Buah 164,000
Buah 219,000
Buah 328,000
Buah 328,000
Buah 17,000
Buah 192,000
Buah 83,000
Buah 73,000
Buah 10,000
Buah 13,000
Buah 8,000
Buah 2,000
Buah 9,000
Buah 30,000
Buah 4,000
Buah 61,000
Buah 328,000
Buah 575,000
Buah 48,000
Buah 148,000
Buah 175,000
Buah 219,000
Buah 27,000
Buah 2,157,000
Buah 5,000
Buah 11,000
Buah 9,000
Buah 6,000
Buah 26,000
Buah 40,000
Buah 120,000
Buah 60,000
Buah 16,000
Buah 53,000
Buah 13,000
Buah 17,000
Buah 3,000
Buah 5,000
Buah 24,000
Buah 186,000
Buah 229,000
Buah 11,000
Buah 2,000
Buah 17,000
Buah 38,000
Buah 117,000
Buah 176,000
Buah 176,000
buah 110,000
buah 110,000
buah 137,000
buah 137,000
buah 164,000
buah 164,000
buah 219,000
Buah 274,000
Buah 328,000
Buah 137,000
Buah 164,000
Buah 246,000
Buah 1,652,000
Buah 1,226,000
Buah 1,100,000
Buah 545,000
Buah 358,000
Buah 41,000
Buah 59,000
Buah 15,000

Bh 200,000
unit 2,391,000
unit 120,000
unit 962,000
unit 722,000
unit 1,082,000
unit 481,000
M3 276,000
kg 25,000
kg 23,000
liter 290,000
Unit 5,216,000
bh 841,000

unit 29,490,000
unit 29,137,000

unit 17,962,000
unit 20,277,000
unit 20,887,000
unit 23,326,000
unit 23,964,000
unit 38,101,000

unit 32,465,000
unit 47,617,000
unit 64,653,000
unit 64,653,000

unit 43,307,000
unit 47,968,000
unit 49,916,000
unit 51,951,000
unit 66,399,000
unit 68,309,000
unit 68,309,000

unit 17,602,000
unit 19,805,000
unit 22,523,000
unit 23,410,000
unit 30,575,000
unit 55,787,000
unit 58,392,000
unit 73,818,000

unit 22,897,000
unit 26,528,000
unit 30,603,000
unit 40,485,000
unit 45,405,000

lembar 1,220,000
lembar 2,433,000
lembar 158,000
lembar 209,000
m2 65,000
m2 56,000
bh 18,000
bh 29,000
bh 53,000
m2 261,000
m2 147,000
m' 158,000
m' 51,000
m' 85,000
m' 73,000
m' 39,000
m' 39,000
set 85,000
m2 136,000
m' 51,000
bh 107,000
bh 147,000
set 51,000 0.8
bh 51,000 0.575
bh 51,000 0.5
pcs 28,000 0.45
lembar 454,000 2.325
lembar 681,000
lembar 794,000 2.334337
lembar 908,000
lembar 1,248,000
lembar 1,589,000
lembar 2,043,000 0.996
lembar 124,000
lembar 198,000
lembar 221,000
bh 45,000
bh 28,000
lbr 124,000
unit 1,500,000
unit 750,000
unit 2,000,000
unit 64,000
unit 50,000
unit 250,000
unit 45,000
unit 28,300
DAFTAR HARGA SATUAN UPAH, BAHAN DAN PERALATAN

HARGA
NO URAIAN SATUAN SATUAN
Rp.

1 2 3 4

I UPAH TENAGA KERJA


1 Mandor . org/hari 90,000
2 Mekanik terlatih . org/hari 81,000
3 Kepala tukang . org/hari 85,500
4 Tukang kayu . org/hari 81,000
5 Tukang batu . org/hari 81,000
6 Tukang besi . org/hari 81,000
7 Tukang cat . org/hari 81,000
8 Tukang plitur . org/hari 81,000
9 Tukang listrik . org/hari 81,000
10 Pekerja. org/hari 67,500

II BAHAN/MATERIAL
A BAHAN DASAR
BATU KALI
1 Batu pecah 0,5/1 (pecah mesin) ( chip ) M3 315,000
2 Batu pecah 1/2 (pecah mesin) M3 315,000
3 Batu pecah 2/3 (pecah mesin) M3 297,000
4 Batu pecah 3/5 (pecah mesin) M3 297,000
5 Batu pecah 4/6 (pecah tangan) M3 270,000
6 Batu pecah 5/7 (pecah tangan) M3 270,000
7 Batu belah / pecah 7/10 - 10/15 - 15/20 M3 315,000
8 Batu belah/pecah besar M3 297,000
9 Batu blondhos M3 180,000

BATU BATA
1 Batu Bata biasa Buah 810

PASIR
1 Pasir beton M3 342,000
2 Pasir pasang M3 342,000
3 Pasir urug M3 128,700
4 Sirtu M3 198,000

TANAH
1 Tanah Lempung M3 45,000
2 Tanah Padas M3 72,000
3 Tanah urug M3 67,500

PORTLAND CEMENT
1 PC / Cement (40 Kg) Zak 45,500
PC / Cement Kg 1,138
HARGA
NO URAIAN SATUAN SATUAN
Rp.

2 PC / Semen putih (40 kg) Zak 90,000


PC / Semen warna Kg 2,250
C BAHAN KAYU
BENGKIRAI
1 Kayu bengkirai (balok) M3 10,484,100
2 Kayu bengkirai (papan) M3 11,700,000
3 Kayu bengkirai 2/3 M3 8,775,000
4 Kayu bengkirai 3/5 M3 8,775,000
5 Kayu bengkirai 5/7 M3 8,775,000

KRUING
1 Kayu Kruing (Balok) M3 7,020,000
2 Kayu Kruing (papan) M3 11,700,000
3 Kayu Kruing 2/3 M3 6,435,000
4 Kayu Kruing 3/5 M3 6,435,000
5 Kayu Kruing 5/7 M3 6,435,000

MERANTI
1 Kayu Meranti (Balok) M3 4,770,000
2 Kayu Meranti (papan) M3 5,400,000
3 Kayu Meranti 2/3 M3 5,040,000
4 Kayu Meranti 3/5 M3 5,040,000
5 Kayu Meranti 5/7 M3 5,040,000

KAMPER
1 Kayu kamfer (balok) M3 7,650,000
2 Kayu Kamfer (papan) M3 9,900,000
3 Kayu kamfer 2/3 M3 7,110,000
4 Kayu kamfer 3/5 M3 7,110,000
5 Kayu kamfer 5/7 M3 7,110,000

LANAN
1 Kayu Lanan/Tahun papan M3 3,690,000
2 Kayu Lanan/Tahun Balok 8/12 M3 3,690,000
3 Kayu Lanan/Tahun Balok 6/12 M3 3,253,500
4 Kayu Lanan/Tahun Usuk 5/7 M3 2,700,000
5 Kayu Lanan/Tahun Usuk 4/6 M3 990,000
6 Kayu Lanan/Tahun Reng 3/5 M3 990,000
7 Kayu Lanan/Tahun Reng 2/3 M3 990,000

SENGON
1 Kayu Sengon Balok 8/12 M3 3,150,000
2 Kayu Sengon Balok 6/12 M3 2,970,000
3 Kayu Sengon Usuk 5/7 M3 2,700,000
4 Kayu Sengon Usuk 4/6 M3 2,340,000
5 Kayu Sengon Reng 3/5 M3 2,340,000
HARGA
NO URAIAN SATUAN SATUAN
Rp.

6 Kayu Sengon Reng 2/3 M3 2,340,000


7 Kayu Sengon Papan M3 1,080,000

DOLKEN
1 Kayu dolok DN / Dolken 8-10 cm Batang 15,750
2 Kayu cetakan M3 3,060,000
3 Kayu bakar M3 126,000
4 Bambu Ø 8-10 cm p = 4 m Batang 11,250
5 Bambu Ø 10-12 cm p = 4 m Batang 21,150
6 Batang kelapa 4 m Batang 360,000
7 Sesek bambu M2 9,000
8 Bilik Bambu M2 20,250

TEAKWOOD
1 Taek wood 90 x 210 x 4 mm Lembar 67,500
2 Taek wood 90 x 210 x 9 mm Lembar 103,500

MULTIPLEK
1 Multiplek 120 x 240 x 6 mm Lembar 81,000
2 Multiplek 120 x 240 x 9 mm Lembar 99,000
3 Multiplek 120 x 240 x 12 mm Lembar 126,000

TRIPLEK
1 Triplek 120 x 240 x 3 mm Lembar 63,900
Triplek 120 x 240 x 4 mm Lembar 67,500
2 Triplek 120 x 240 x 5 mm Lembar 72,000

D BAHAN PENUTUP DINDING / LANTAI


KERAMIK
1 Ubin keramik 20 x 20 (polos) M2 51,300
2 Ubin keramik 20 x 20 (motif) M2 49,050
3 Ubin keramik 30 x 30 (polos) M2 39,600
4 Ubin keramik 30 x 30 (motif) M2 49,500
5 Ubin keramik 40 x 40 (polos) M2 49,500
6 Ubin keramik 40 x 40 (motif) M2 59,400
7 Ubin keramik 60 x 60 (motif) M2 160,000
8 Keramik dinding 20 x 20 M2 52,650
9 Keramik dinding 20 x 25 M2 51,750

F BAHAN BESI
BESI BETON
1 Besi beton polos SNI Kg 9,450
2 Besi beton ulir SNI Kg 9,450
4 Besi sengkang (angkur, baut) Kg 8,100

KAWAT
HARGA
NO URAIAN SATUAN SATUAN
Rp.

1 Kawat beton/Bendrat Kg 18,000

L BAHAN SANITAIR
1 Kloset duduk lengkap Buah 1,600,000
2 Wastafel INA Bh 171,000

M BAHAN PENGIKAT KAYU


1 Paku Kg 13,500
2 Paku asbes Buah 27,900
4 Paku kait lengkap Buah 2,700
5 Paku payung Kg 35,100
6 Paku Pancing Kg 14,850
7 Paku sekrup Kg 10,350
8 Tali Ijuk Kg 5,850
9 Lem kayu Kg 14,040
10 Lem kuning AICA AIBON Kg 34,200
11 Skrup Fisher Bh 900

N BAHAN LAIN-LAIN
1 Air M3 72,000
2 Air Ltr 72
3 Minyak Oli/Pelumas Liter 27,000
4 Sabun Kg 9,000
5 Sealer Tube 51,750
6 Soda Api Kg 16,200
7 Solar Liter 8,100
8 Elastomer Buah 495,000

R BAHAN SARANA PRASARANA AIR BERSIH DAN PERPIPAAN


HARGA SATUAN PIPA.
1 PIPA PVC. RUCIKA. AW SAMBUNGAN SC.
DN. 3" , p= 4 m M' 68,400
DN. 3/4" , p= 4 m M' 9,900
DN. 1/2" , p= 4 m M' 8,100

Penyedia Jasa
MATERIAL YANG DIGUNAKAN CV. CIPTA KARYA MANDIRI
CEK HARGA KARENA HARGA BARU / HARGA 2017
KARENA HARGA DIGUNAKAN PADA ANALISA
MATERIAL PELEGKAP BARU PERMINTAAN MAS AJIE'
HARGA DI CEK ULANG

MUH ZULHAM NURSALIM, SH


Direktur
RENCANA ANGGARAN BIAYA

PEKERJAAN : REHAB PELEBARAN JALAN KANTOR PP-PAUD DAN DIKMAS JAWA TENGAH
LOKASI : KANTOR PP-PAUD DAN DIKMAS JAWA TENGAH
TAHUN ANGARAN : 2019

NO URAIAN PEKERJAAN VOLUME HARGA SATUAN JUMLAH HARGA TOTAL HARGA

A PEKERJAAN PERSIAPAN
1 Uitzet Lapangan dan Pembersihan 1.00 Ls 500,000.00 500,000.00
2 Buang Bongkaran Keluar Lokasi 1.00 Ls 1,800,000.00 1,800,000.00
JUMLAH 2,300,000.00
B REHAB SALURAN
1 Bongkar Plat Beton Existing 2.85 m3 1,109,750.00 3,162,787.50
2 Bongkar rolag Bata 4.56 m3 607,579.50 2,770,562.52
3 Pasangan Batu Belah 1:5 1.20 m3 1,003,157.08 1,203,788.49
4 Pasangan Bata 1:5 26.55 m2 130,704.40 3,470,201.82
5 Plesteran 53.10 m2 94,753.10 5,031,389.61
6 Urugan Pasir Bawah rolag 0.76 m2 115,143.75 87,509.25
7 Rolag Bata 1:5 4.56 m3 1,188,221.82 5,418,291.49
8 Pasangan Keramik 30x30 cm Unpholish 15.96 m3 177,315.26 2,829,951.50
9 Beton Lantai Saluran 1.14 m3 1,136,943.80 1,296,115.94
10 Membuat Grill Besi 6.00 m1 450,000.00 2,700,000.00
11 Membuat Bak Kontrol 1.00 bh 794,231.40 794,231.40
12 Cor Beton Penutup Saluran 4.56 m3 1,491,945.52 6,803,271.56
13 Pembesian 141.36 kg 13,027.03 1,841,500.61
14 Bekisting Plat 28.50 m3 314,881.50 8,974,122.75
JUMLAH 46,383,724.44
JUMLAH TOTAL 48,683,724.44
PPN 10% 4,868,372.44
JUMLAH TOTAL + PPN 10% 53,552,096.88
DIBULATKAN 53,552,000.00
RENCANA ANGGARAN BIAYA
PEKERJAAN : REHAB PELEBARAN JALAN KANTOR PP-PAUD DAN DIKMAS JAWA TENGAH
LOKASI : KANTOR PP-PAUD DAN DIKMAS JAWA TENGAH
TAHUN ANGARAN : 2019

NO URAIAN PEKERJAAN VOLUME HARGA SATUAN JUMLAH HARGA TOTAL HARGA

A PEKERJAAN PERSIAPAN
1 Uitzet Lapangan dan Pembersihan 1.00 Ls 500,000.00 500,000.00
2 Buang Bongkaran Keluar Lokasi 1.00 Ls 2,000,000.00 2,000,000.00
JUMLAH 2,500,000.00
B REHAB SALURAN
1 Bongkar Plat Beton Existing 2.85 m3 1,109,750.00 3,162,787.50
2 Bongkar rolag Bata 4.56 m3 607,579.50 2,770,562.52
3 Pasangan Bata 1:5 39.90 m2 130,704.40 5,215,105.56
4 Plesteran 39.90 m2 94,753.10 3,780,648.69
5 Acian 39.90 m2 54,165.00 2,161,183.50
6 Beton Lantai Saluran 1.14 m3 1,136,943.80 1,296,115.94
7 Membuat Grill Besi 6.00 m1 450,000.00 2,700,000.00
8 Membuat Bak Kontrol 2.00 bh 794,231.40 1,588,462.80
9 Cor Beton Penutup Saluran 4.06 m3 1,491,945.52 6,057,298.80
10 Pembesian 141.36 kg 13,027.03 1,841,500.61
11 Bekisting Plat 28.5 m3 314,881.50 8,974,122.75
JUMLAH 39,547,788.67
JUMLAH TOTAL 42,047,788.67
PPN 10% 4,204,778.87
JUMLAH TOTAL + PPN 10% 46,252,567.53
DIBULATKAN 46,252,000.00

UNGARAN, 2 April 2019


CV. CIPTA KARYA MANDIRI

MUH ZULHAM NURSALIM, SH


Direktur
RENCANA ANGGARAN BIAYA

PEKERJAAN : REHAB KAMAR MANDI KANTOR PP-PAUD DAN DIKMAS JAWA TENGAH
LOKASI : KANTOR PP-PAUD DAN DIKMAS JAWA TENGAH
TAHUN ANGARAN : 2019

NO URAIAN PEKERJAAN VOLUME HARGA SATUAN JUMLAH HARGA TOTAL HARGA

A PEKERJAAN PERSIAPAN
1 Uitzet Lapangan dan Pembersihan 1.00 Ls 500,000.00 500,000.00
2 Buang Bongkaran Keluar Lokasi 1.00 Ls 2,000,000.00 2,000,000.00
JUMLAH 2,500,000.00
B REHAB KAMAR MANDI DAN INSTALASINYA
1 Bongkar Closed Lama 1.00 Ls 350,000.00 350,000.00
2 Bongkar Wastvel Lama 1.00 Ls 250,000.00 250,000.00
3 Closed Duduk 1.00 bh 2,326,570.75 2,326,570.75
4 Jet Shower 1.00 bh 250,000.00 250,000.00
5 Kran Air 1.00 bh 71,471.93 71,471.93
6 Kran Air Wastavel 1.00 bh 200,000.00 200,000.00
7 Wastavel 1.00 bh 399,182.25 399,182.25
8 Pasang Pipa PVC 3 inci 6.00 m1 142,527.26 855,163.58
9 Pasang Pipa PVC 3/4 Inci 15.00 m1 26,827.20 402,408.00
10 Bongkaran Rabat Beton Existing 2.81 m3 1,109,750.00 3,114,790.81
11 Urugan Pasir Bawah Rabat 1.48 m3 115,143.75 170,412.75
12 Keramik Lantai 40x40 cm 28.07 m2 272,253.44 7,641,473.53
13 Pembuatan Taman 1.00 Ls 2,000,000.00 2,000,000.00
JUMLAH 18,031,473.59
JUMLAH TOTAL 20,531,473.59
PPN 10% 2,053,147.36
JUMLAH TOTAL + PPN 10% 22,584,620.95
DIBULATKAN 22,584,000.00

UNGARAN, 18 April 2019


CV. CIPTA KARYA MANDIRI

MUH ZULHAM NURSALIM, SH


Direktur
RENCANA ANGGARAN BIAYA
PEKERJAAN : PERBAIKAN KERAMIK GEDUNG PALAPA
LOKASI : KANTOR PP-PAUD DAN DIKMAS JAWA TENGAH
TAHUN ANGARAN : 2019

NO URAIAN PEKERJAAN VOLUME HARGA SATUAN JUMLAH HARGA TOTAL HARGA

A PEKERJAAN PERSIAPAN
1 Uitzet Lapangan dan Pembersihan 1.00 Ls 500,000.00 500,000.00
2 Buang Bongkaran Keluar Lokasi 1.00 Ls 1,000,000.00 1,000,000.00
JUMLAH 1,500,000.00
B REHAB SALURAN
1 Bongkar rolag Bata 1.91 m3 607,579.50 1,162,907.16
2 Rolag Bata 1:5 1.91 m3 Err:509 Err:509
3 Pasangan Keramik Lantai 60x60 cm 35.13 m2 271,711.65 9,546,099.74
4 Pasang Keramik Lantai 30x30 cm 9.00 m2 177,315.26 1,595,837.31
5 Cor Beton Lantai Akses Difable 1.88 m3 1,083,134.56 2,030,877.31
6 Pasang Karpet Lantai Difable 6.25 m2 260,000.00 1,625,000.00
7 Pembuatan Railing Akses Difable 6.00 m2 1,500,000.00 9,000,000.00
JUMLAH Err:509
JUMLAH TOTAL Err:509
PPN 10% Err:509
JUMLAH TOTAL + PPN 10% Err:509
DIBULATKAN Err:509

UNGARAN, 2019
CV. CIPTA KARYA MANDIRI

MUH ZULHAM NURSALIM, SH


Direktur
RENCANA ANGGARAN BIAYA

PEKERJAAN :
LOKASI :
TAHUN ANGARAN :

NO URAIAN PEKERJAAN

A PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan
2 Administrasi Proyek
JUMLAH
B PEKERJAAN TEMPAT PARKIR
1 Galian Tanah 1.00 x 1.00 x 1.50 x 6

2 Pasir Urug Bawah 1.00 x 1.00 x 0.10 x 6


21.00 x 5.00 x 0.10 x 1

3 Pondasi Footplat
→ Beton 1.00 x 1.00 x 0.20 x 6.00
1/2 x 1.00 x 1.00 x 0.15 x 6.00

→ Bekisting 1.00 x 0.20 x 4.00 x 6.00

→ Pembesian 1.00 x 9.00 x 1.04 x 6.00


1.00 x 9.00 x 1.04 x 6.00

4 Kolom Ukuran 25/40 cm


→ Beton 0.40 x 0.25 x 5.00 x 6.00

→ Bekisting 1.30 x 5.00 x 6.00

→ Pembesian 13 5.00 x 4.00 x 1.04 x 6.00


10 5.00 x 4.00 x 0.62 x 6.00

5 Sloof Ukuran 15/20 cm


→ Beton 21.00 x 0.15 x 0.20

→ Bekisting 21.00 x 0.40

→ Pembesian 21.00 x 4.00 x 0.62

6 Balok Ukuran 20/25 cm


→ Beton 21.00 x 0.20 x 0.25
1.00 x 0.20 x 0.25 x 8.00

→ Bekisting 21.00 x 0.40


1.00 x 0.40 x 8.00

→ Pembesian 21.00 x 4.00 x 0.62


1.00 x 4.00 x 0.62 x 8.00

7 Lantai Beton Tebal 12 cm 21.00 x 5.00 x 0.12


4.00 x 10.00 x 0.12

8 Membuat Atap Tempat Parkir


→ C Double 150 x 50 x 20 x 2,3 5.20 x 4.97 x 6.00 x 2.00

→ Plat Plendes 10 mm 0.25 x 0.35 x 6.00 x 80.90

→ Angkur Baut M16 6.00 x 8.00

→ Besi Hollow 4x6 cm ( Rangka Atap ) 21.00 x 5.20

→ Tali Pancang

9 Talang BJLS lebar 90 cm + Rangka 21.00


10 Pipa PVC 3'' 2.00 x 8.00

11 Atap Galvalum Berpasir

12 Stopper Beton 21.00 x 0.10 x 0.15


JUMLAH
JUMLAH TOTAL
PPN 10%
JUMLAH TOTAL + PPN 10%
DIBULATKAN
RENCANA ANGGARAN BIAYA

VOLUME

1.00 Ls
1.00 Ls

9.00 m3

0.60 11.10 m3
10.50

1.20 1.65 m3
0.45

4.80 4.80 m2

56.29 112.58 kg
56.29

3.00 m3

39.00 m2

125.08 199.10 kg
74.01

0.63 0.63 m3

8.40 8.40 m2

51.81 51.81 kg

1.05 1.45 m3
0.40

8.40 11.60 m2
3.20

51.81 71.55 kg
19.74

12.60 17.40 m3
4.80

309.92 309.92 kg

42.47 kg

48.00 bh

109.20 m2

8.00 bh

21.00 m1
16.00 m1

109.20 m2

0.32 m3
A. 4.5.1.HARGA SATUAN PEKERJAAN LANGIT-LANGIT
A. 4.5.1.1 Pemasangan 1 m2 Langit-langit Asbes semen , tebal 4 mm, 5 mm dan 6 mm 29,461.28

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.03 67,500.00 2,025.00
Tukang Kayu L.02 OH 0.07 81,000.00 5,670.00
Kepala Tukang L.03 OH 0.007 85,500.00 598.50
Mandor L.04 OH 0.004 90,000.00 360.00
JUMLAH TENAGA KERJA 8,653.50
B BAHAN
Plat Asbes Lbr 1.1 15,300.00 16,830.00
Paku Kg 0.01 13,500.00 135.00
JUMLAH HARGA BAHAN 16,965.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 25,618.50
E Overhead & Profit 15% x D 3,842.78
F Harga Satuan Pekerjaan (D+E) 29,461.28

A. 4.5.1.1a Pemasangan 1 m2 Bongkar Plafond Existing 9,951.53

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.03 67,500.00 2,025.00
Tukang Kayu L.02 OH 0.07 81,000.00 5,670.00
Kepala Tukang L.03 OH 0.007 85,500.00 598.50
Mandor L.04 OH 0.004 90,000.00 360.00
JUMLAH TENAGA KERJA 8,653.50
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah A + B + C 8,653.50
E Overhead & Profit 15% x D 1,298.03
F Harga Satuan Pekerjaan (D+E) 9,951.53

A. 4.5.1.2 Pemasangan 1 m2 Langit-langit Akustik Ukuran (30x30) cm 91,380.15

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.12 67,500.00 8,100.00
Tukang Kayu L.02 OH 0.12 81,000.00 9,720.00
Kepala Tukang L.03 OH 0.012 85,500.00 1,026.00
Mandor L.04 OH 0.006 90,000.00 540.00
JUMLAH TENAGA KERJA 19,386.00
B BAHAN
Akustik Uk.30 x 30 cm Lbr 12.0 4,950.00 59,400.00
Paku Kg 0.05 13,500.00 675.00
JUMLAH HARGA BAHAN 60,075.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 79,461.00
E Overhead & Profit 15% x D 11,919.15
F Harga Satuan Pekerjaan (D+E) 91,380.15

A. 4.5.1.3 Pemasangan 1 m2 Langit-langit Akustik Ukuran (30x60) cm 108,913.05

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.12 67,500.00 8,100.00
Tukang Kayu L.02 OH 0.12 81,000.00 9,720.00
Kepala Tukang L.03 OH 0.012 85,500.00 1,026.00
Mandor L.04 OH 0.006 90,000.00 540.00
JUMLAH TENAGA KERJA 19,386.00
B BAHAN
Akustik Uk.30 x 60 cm Lbr 5.80 12,870.00 74,646.00
Paku Kg 0.05 13,500.00 675.00
JUMLAH HARGA BAHAN 75,321.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 94,707.00
E Overhead & Profit 15% x D 14,206.05
F Harga Satuan Pekerjaan (D+E) 108,913.05

A. 4.5.1.4 Pemasangan 1 m2 Langit-langit Akustik Ukuran (60x120) cm 87,664.50

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.10 67,500.00 6,750.00
Tukang Kayu L.02 OH 0.10 81,000.00 8,100.00
Kepala Tukang L.03 OH 0.01 85,500.00 855.00
Mandor L.04 OH 0.005 90,000.00 450.00
JUMLAH TENAGA KERJA 16,155.00
B BAHAN
Akustik Uk.30 x 120 cm Lbr 1.50 39,600.00 59,400.00
Paku Kg 0.05 13,500.00 675.00
JUMLAH HARGA BAHAN 60,075.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 76,230.00
E Overhead & Profit 15% x D 11,434.50
F Harga Satuan Pekerjaan (D+E) 87,664.50

A. 4.5.1.5 Memasang 1 m2 Langit-langit Tripleks Uk (120x240) cm, Tebal 3 mm, 4 mm & 6 mm 46,600.88

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.10 67,500.00 6,750.00
Tukang Kayu L.02 OH 0.10 81,000.00 8,100.00
Kepala Tukang L.03 OH 0.01 85,500.00 855.00
Mandor L.04 OH 0.005 90,000.00 450.00
JUMLAH TENAGA KERJA 16,155.00
B BAHAN
Tripleks (4 mm) Lbr 0.375 63,900.00 23,962.50
Paku Tripleks Kg 0.03 13,500.00 405.00
JUMLAH HARGA BAHAN 24,367.50
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah A + B + C 40,522.50
E Overhead & Profit 15% x D 6,078.38
F Harga Satuan Pekerjaan (D+E) 46,600.88

A. 4.5.1.6 Memasang 1 m2 Langit-langit Lambriziring Kayu Jati, tebal 6 mm 467,043.75

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.8 67,500.00 54,000.00
Tukang Kayu L.02 OH 0.8 81,000.00 64,800.00
Kepala Tukang L.03 OH 0.08 85,500.00 6,840.00
Mandor L.04 OH 0.04 90,000.00 3,600.00
JUMLAH TENAGA KERJA 129,240.00
B BAHAN
Kayu Jati,Papan m3 0.015 18,450,000.00 276,750.00
Paku Kg 0.01 13,500.00 135.00
JUMLAH HARGA BAHAN 276,885.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 406,125.00
E Overhead & Profit 15% x D 60,918.75
F Harga Satuan Pekerjaan (D+E) 467,043.75

A. 4.5.1.7 Memasang 1 m2 Langit-langit Gypsum Board, Uk (120x240) tebal 9 mm 40,733.46

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.1 67,500.00 6,750.00
Tukang Kayu L.02 OH 0.05 81,000.00 4,050.00
Kepala Tukang L.03 OH 0.005 85,500.00 427.50
Mandor L.04 OH 0.005 90,000.00 450.00
JUMLAH TENAGA KERJA 11,677.50
B BAHAN
Gypsum Board Lbr 0.364 62,100.00 22,604.40
Paku Sekrup Kg 0.11 10,350.00 1,138.50
JUMLAH HARGA BAHAN 23,742.90
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 35,420.40
E Overhead & Profit 15% x D 5,313.06
F Harga Satuan Pekerjaan (D+E) 40,733.46

A. 4.5.1.8 Memasang 1 m2 Langit-langit Akustik Uk (60x120) cm berikut Rangka Allumunium 154,991.25

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.5 67,500.00 33,750.00
Tukang Kayu L.02 OH 0.5 81,000.00 40,500.00
Kepala Tukang L.03 OH 0.05 85,500.00 4,275.00
Mandor L.04 OH 0.025 90,000.00 2,250.00
JUMLAH TENAGA KERJA 80,775.00
B BAHAN
Profil Allumunium "T" m' 3.6 3,600.00 12,960.00
Kawat Ø 4 mm kg 0.15 6,300.00 945.00
Ramset bh 1.05 19,800.00 20,790.00
Akuatik 60 x 120 cm lmb 1.5 12,870.00 19,305.00
JUMLAH HARGA BAHAN 54,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 134,775.00
E Overhead & Profit 15% x D 20,216.25
F Harga Satuan Pekerjaan (D+E) 154,991.25

A. 4.5.1.9 Pemasangan 1 m' List Langit-Langit Kayu Profil 17,375.06

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.05 67,500.00 3,375.00
Tukang Kayu L.02 OH 0.05 81,000.00 4,050.00
Kepala Tukang L.03 OH 0.005 85,500.00 427.50
Mandor L.04 OH 0.003 90,000.00 270.00
JUMLAH TENAGA KERJA 8,122.50
B BAHAN
List Kayu Profil m1 1.05 6,525.00 6,851.25
Paku Kg 0.01 13,500.00 135.00
JUMLAH HARGA BAHAN 6,986.25
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 15,108.75
E Overhead & Profit 15% x D 2,266.31
F Harga Satuan Pekerjaan (D+E) 17,375.06

A. 4.5.1.10 Pemasangan 1 m2 Rangka Langit-Langit Hollow 40.40 -


Lihat pada kelompok Pekerjaan Besi dan Allumunium (A.4.2.1.20 dan A.4.2.1.21)

A. 4.5.1.7.a Memasang 1 m2 Langit-langit Kalsi Board, Uk (120x240) tebal 4,5 mm 40,733.46

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.1 67,500.00 6,750.00
Tukang Kayu L.02 OH 0.05 81,000.00 4,050.00
Kepala Tukang L.03 OH 0.005 85,500.00 427.50
Mandor L.04 OH 0.005 90,000.00 450.00
JUMLAH TENAGA KERJA 11,677.50
B BAHAN
Kalsi Board Lbr 0.364 62,100.00 22,604.40
Paku Sekrup Kg 0.11 10,350.00 1,138.50
JUMLAH HARGA BAHAN 23,742.90
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 35,420.40
E Overhead & Profit 15% x D 5,313.06
F Harga Satuan Pekerjaan (D+E) 40,733.46

A. 4.5.1.7b Memasang 1 m2 Langit-langit Gypsum Board, Uk (120x240) tebal 9 mm 40,733.46

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.1 67,500.00 6,750.00
Tukang Kayu L.02 OH 0.05 81,000.00 4,050.00
Kepala Tukang L.03 OH 0.005 85,500.00 427.50
Mandor L.04 OH 0.005 90,000.00 450.00
JUMLAH TENAGA KERJA 11,677.50
B BAHAN
Gypsum Board Lbr 0.364 62,100.00 22,604.40
Paku Sekrup Kg 0.11 10,350.00 1,138.50

JUMLAH HARGA BAHAN 23,742.90


C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 35,420.40
E Overhead & Profit 15% x D 5,313.06
F Harga Satuan Pekerjaan (D+E) 40,733.46
A. 4.5.1.7c Memasang 1 m2 Langit-langit PVC 304,538.40

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.100 67,500.00 6,750.00
Tukang Kayu L.02 OH 0.050 81,000.00 4,050.00
Kepala Tukang L.03 OH 0.005 85,500.00 427.50
Mandor L.04 OH 0.005 90,000.00 450.00
JUMLAH TENAGA KERJA 11,677.50
B BAHAN
Plafond PVC m2 1.000 252,000.00 252,000.00
Paku Sekrup Kg 0.110 10,350.00 1,138.50

JUMLAH HARGA BAHAN 253,138.50


C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 264,816.00
E Overhead & Profit 15% x D 39,722.40
F Harga Satuan Pekerjaan (D+E) 304,538.40

Dihitung Memasang 1 m' List Gypsum 12 cm 29,155.95

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.060 67,500.00 4,050.00
Tukang Kayu L.02 OH 0.060 81,000.00 4,860.00
Kepala Tukang L.03 OH 0.006 85,500.00 513.00
Mandor L.04 OH 0.003 90,000.00 270.00
JUMLAH TENAGA KERJA 9,693.00
B BAHAN
List Gypsum m' 1.050 13,950.00 14,647.50
Tepung Gypsum Kg 0.15 6,750.00 1,012.50

JUMLAH HARGA BAHAN 15,660.00


C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 25,353.00
E Overhead & Profit 15% x D 3,802.95
F Harga Satuan Pekerjaan (D+E) 29,155.95
A. 4.5.2.HARGA SATUAN PEKERJAAN PENUTUP ATAP
A. 4.5.2.1 Pemasangan 1 m2 Atap Genteng Plentong Kecil 90,057.94

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.150 67,500.00 10,125.00
Tukang Kayu L.02 OH 0.075 81,000.00 6,075.00
Kepala Tukang L.03 OH 0.008 85,500.00 641.25
Mandor L.04 OH 0.008 90,000.00 720.00
JUMLAH TENAGA KERJA 17,561.25
B BAHAN
Genteng Plentong Buah 25.000 2,430.00 60,750.00
JUMLAH HARGA BAHAN 60,750.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 78,311.25
E Overhead & Profit 15% x D 11,746.69
F Harga Satuan Pekerjaan (D+E) 90,057.94

A. 4.5.2.2 Pemasangan 1 m2 Atap Genteng Kodok / Glasur 92,694.60

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.150 67,500.00 10,125.00
Tukang Kayu L.02 OH 0.075 81,000.00 6,075.00
Kepala Tukang L.03 OH 0.008 85,500.00 684.00
Mandor L.04 OH 0.008 90,000.00 720.00
JUMLAH TENAGA KERJA 17,604.00
B BAHAN
Genteng Kodok / Glasur Buah 25.000 2,520.00 63,000.00
JUMLAH HARGA BAHAN 63,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 80,604.00
E Overhead & Profit 15% x D 12,090.60
F Harga Satuan Pekerjaan (D+E) 92,694.60

A. 4.5.2.3 Pemasangan 1 m2 Atap Genteng Plentong Super / Besar 92,901.60

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.150 67,500.00 10,125.00
Tukang Kayu L.02 OH 0.075 81,000.00 6,075.00
Kepala Tukang L.03 OH 0.008 85,500.00 684.00
Mandor L.04 OH 0.008 90,000.00 720.00
JUMLAH TENAGA KERJA 17,604.00
B BAHAN
Genteng Plentong Super / Besar Buah 18.000 3,510.00 63,180.00
JUMLAH HARGA BAHAN 63,180.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 80,784.00
E Overhead & Profit 15% x D 12,117.60
F Harga Satuan Pekerjaan (D+E) 92,901.60

A. 4.5.2.4 Pemasangan 1 m' Genteng Bubung Plentong 111,129.10

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.400 67,500.00 27,000.00
Tukang Kayu L.02 OH 0.200 81,000.00 16,200.00
Kepala Tukang L.03 OH 0.020 85,500.00 1,710.00
Mandor L.04 OH 0.002 90,000.00 180.00
JUMLAH TENAGA KERJA 45,090.00
B BAHAN
Genteng Bubung Plentong Buah 5.000 6,300.00 31,500.00
Portland Semen Kg 8.000 1,137.50 9,100.00
Pasir Pasang m3 0.032 342,000.00 10,944.00
JUMLAH HARGA BAHAN 51,544.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 96,634.00
E Overhead & Profit 15% x D 14,495.10
F Harga Satuan Pekerjaan (D+E) 111,129.10

A. 4.5.2.5 Pemasangan 1 m' Genteng Bubung Kodok / Glasur 102,849.10

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.400 67,500.00 27,000.00
Tukang Kayu L.02 OH 0.200 81,000.00 16,200.00
Kepala Tukang L.03 OH 0.020 85,500.00 1,710.00
Mandor L.04 OH 0.002 90,000.00 180.00
JUMLAH TENAGA KERJA 45,090.00
B BAHAN
Genteng Bubung Kodok / Glasur Buah 5.000 4,860.00 24,300.00
Portland Semen Kg 8.000 1,137.50 9,100.00
Pasir Pasang m3 0.032 342,000.00 10,944.00
JUMLAH HARGA BAHAN 44,344.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 89,434.00
E Overhead & Profit 15% x D 13,415.10
F Harga Satuan Pekerjaan (D+E) 102,849.10

A. 4.5.2.6 Pemasangan 1 m' Genteng Bubung Plentong Besar 105,954.10

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.400 67,500.00 27,000.00
Tukang Kayu L.02 OH 0.200 81,000.00 16,200.00
Kepala Tukang L.03 OH 0.020 85,500.00 1,710.00
Mandor L.04 OH 0.002 90,000.00 180.00
JUMLAH TENAGA KERJA 45,090.00
B BAHAN
Genteng Bubung Plentong Besar Buah 4.000 6,750.00 27,000.00
Portland Semen Kg 8.000 1,137.50 9,100.00
Pasir Pasang m3 0.032 342,000.00 10,944.00
JUMLAH HARGA BAHAN 47,044.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 92,134.00
E Overhead & Profit 15% x D 13,820.10
F Harga Satuan Pekerjaan (D+E) 105,954.10

A. 4.5.2.9 Pemasangan 1 m2 Atap Asbes Gelombang (2,25x0,92 m) x 5 mm 70,887.15

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.140 67,500.00 9,450.00
Tukang Kayu L.02 OH 0.075 81,000.00 6,075.00
Kepala Tukang L.03 OH 0.008 85,500.00 684.00
Mandor L.04 OH 0.008 90,000.00 720.00
JUMLAH TENAGA KERJA 16,929.00
B BAHAN
Asbes Gelombang Lbr 0.600 71,550.00 42,930.00
Paku Pancing 60 x 230 Kg 0.120 14,850.00 1,782.00
JUMLAH HARGA BAHAN 44,712.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 61,641.00
E Overhead & Profit 15% x D 9,246.15
F Harga Satuan Pekerjaan (D+E) 70,887.15

A. 4.5.2.10 Pemasangan 1 m2 Atap Asbes Gelombang (2,00x0,92 m) x 5 mm 64,320.08

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.140 67,500.00 9,450.00
Tukang Kayu L.02 OH 0.070 81,000.00 5,670.00
Kepala Tukang L.03 OH 0.007 85,500.00 598.50
Mandor L.04 OH 0.007 90,000.00 630.00
JUMLAH TENAGA KERJA 16,348.50
B BAHAN
Asbes Gelombang Lbr 0.600 63,000.00 37,800.00
Paku Pancing 60 x 230 Kg 0.120 14,850.00 1,782.00
JUMLAH HARGA BAHAN 39,582.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 55,930.50
E Overhead & Profit 15% x D 8,389.58
F Harga Satuan Pekerjaan (D+E) 64,320.08

A. 4.5.2.12 Pemasangan 1 m2 Atap Asbes Gelombang (3,00x1,05 m) x 4 mm 54,720.45

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.140 67,500.00 9,450.00
Tukang Kayu L.02 OH 0.070 81,000.00 5,670.00
Kepala Tukang L.03 OH 0.007 85,500.00 598.50
Mandor L.04 OH 0.007 90,000.00 630.00
JUMLAH TENAGA KERJA 16,348.50
B BAHAN
Asbes Gelombang Lbr 0.350 84,150.00 29,452.50
Paku Pancing 60 x 230 Kg 0.120 14,850.00 1,782.00
JUMLAH HARGA BAHAN 31,234.50
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 47,583.00
E Overhead & Profit 15% x D 7,137.45
F Harga Satuan Pekerjaan (D+E) 54,720.45

A. 4.5.2.15 Pemasangan 1 m2 Atap Asbes Gelombang (2,10x1,05 m) x 4 mm 55,371.47

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.140 67,500.00 9,450.00
Tukang Kayu L.02 OH 0.070 81,000.00 5,670.00
Kepala Tukang L.03 OH 0.007 85,500.00 598.50
Mandor L.04 OH 0.007 90,000.00 630.00
JUMLAH TENAGA KERJA 16,348.50
B BAHAN
Asbes Gelombang Lbr 0.510 58,860.00 30,018.60
Paku Pancing 60 x 230 Kg 0.120 14,850.00 1,782.00
JUMLAH HARGA BAHAN 31,800.60
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 48,149.10
E Overhead & Profit 15% x D 7,222.37
F Harga Satuan Pekerjaan (D+E) 55,371.47

A. 4.5.2.30 Pemasangan 1 m2 Atap Genteng Beton 114,988.50

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.200 67,500.00 13,500.00
Tukang Kayu L.02 OH 0.100 81,000.00 8,100.00
Kepala Tukang L.03 OH 0.010 85,500.00 855.00
Mandor L.04 OH 0.010 90,000.00 900.00
JUMLAH TENAGA KERJA 23,355.00
B BAHAN
Genteng Beton Standrad Lbr 11.000 6,930.00 76,230.00
Paku Biasa 2" - 5" Kg 0.030 13,500.00 405.00
JUMLAH HARGA BAHAN 76,635.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 99,990.00
E Overhead & Profit 15% x D 14,998.50
F Harga Satuan Pekerjaan (D+E) 114,988.50

A. 4.5.2.32 Pemasangan 1 m2 Atap Genteng Metal 135,533.25

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.200 67,500.00 13,500.00
Tukang Kayu L.02 OH 0.100 81,000.00 8,100.00
Kepala Tukang L.03 OH 0.010 85,500.00 855.00
Mandor L.04 OH 0.010 90,000.00 900.00
JUMLAH TENAGA KERJA 23,355.00
B BAHAN
Genteng Metal m2 1.020 90,000.00 91,800.00
Paku Biasa Ø ½" - 1" Kg 0.200 13,500.00 2,700.00
JUMLAH HARGA BAHAN 94,500.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 117,855.00
E Overhead & Profit 15% x D 17,678.25
F Harga Satuan Pekerjaan (D+E) 135,533.25

A. 4.5.2.32.a Pemasangan 1 m2 Atap Genteng Metal Pasir 161,925.75

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.200 67,500.00 13,500.00
Tukang Kayu L.02 OH 0.100 81,000.00 8,100.00
Kepala Tukang L.03 OH 0.010 85,500.00 855.00
Mandor L.04 OH 0.010 90,000.00 900.00
JUMLAH TENAGA KERJA 23,355.00
B BAHAN
Genteng Metal Pasir m2 1.020 112,500.00 114,750.00
Paku Biasa Ø ½" - 1" Kg 0.200 13,500.00 2,700.00
JUMLAH HARGA BAHAN 117,450.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 140,805.00
E Overhead & Profit 15% x D 21,120.75
F Harga Satuan Pekerjaan (D+E) 161,925.75

A. 4.5.2.33 Pemasangan 1 m2 Atap Sirap Kayu 104,664.38

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.166 67,500.00 11,205.00
Tukang Kayu L.02 OH 0.250 81,000.00 20,250.00
Kepala Tukang L.03 OH 0.025 85,500.00 2,137.50
Mandor L.04 OH 0.008 90,000.00 720.00
JUMLAH TENAGA KERJA 34,312.50
B BAHAN
Genteng Sirap Lbr 30.000 1,800.00 54,000.00
Paku Biasa 1/2" - 1" Kg 0.200 13,500.00 2,700.00
JUMLAH HARGA BAHAN 56,700.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 91,012.50
E Overhead & Profit 15% x D 13,651.88
F Harga Satuan Pekerjaan (D+E) 104,664.38

A. 4.5.2.34 Pemasangan 1 m' Nok Genteng Beton 110,962.35

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.400 67,500.00 27,000.00
Tukang Kayu L.02 OH 0.200 81,000.00 16,200.00
Kepala Tukang L.03 OH 0.020 85,500.00 1,710.00
Mandor L.04 OH 0.020 90,000.00 1,800.00
JUMLAH TENAGA KERJA 46,710.00
B BAHAN
Nok Genteng Beton Buah 3.500 6,750.00 23,625.00
Paku Biasa 2" - 5" Kg 0.050 13,500.00 675.00
Portland Semen Kg 10.800 1,137.50 12,285.00
Pasir Pasang m3 0.032 342,000.00 10,944.00
Semen Warna Kg 1.000 2,250.00 2,250.00
JUMLAH HARGA BAHAN 49,779.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 96,489.00
E Overhead & Profit 15% x D 14,473.35
F Harga Satuan Pekerjaan (D+E) 110,962.35

A. 4.5.2.36 Pemasangan 1 m' Nok Genteng Metal 52,800.53

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.250 67,500.00 16,875.00
Tukang Kayu L.02 OH 0.150 81,000.00 12,150.00
Kepala Tukang L.03 OH 0.015 85,500.00 1,282.50
Mandor L.04 OH 0.013 90,000.00 1,170.00
JUMLAH TENAGA KERJA 31,477.50
B BAHAN
Nok Genteng Metal Buah 1.100 12,510.00 13,761.00
Paku Biasa 1/2" - 1" Kg 0.050 13,500.00 675.00
JUMLAH HARGA BAHAN 14,436.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 45,913.50
E Overhead & Profit 15% x D 6,887.03
F Harga Satuan Pekerjaan (D+E) 52,800.53

A. 4.5.2.36.a Pemasangan 1 m' Nok Genteng Metal Pasir 55,191.38

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.250 67,500.00 16,875.00
Tukang Kayu L.02 OH 0.150 81,000.00 12,150.00
Kepala Tukang L.03 OH 0.015 85,500.00 1,282.50
Mandor L.04 OH 0.013 90,000.00 1,170.00
JUMLAH TENAGA KERJA 31,477.50
B BAHAN
Nok Genteng Metal Pasir Buah 1.100 14,400.00 15,840.00
Paku Biasa 2" - 5" Kg 0.050 13,500.00 675.00
JUMLAH HARGA BAHAN 16,515.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 47,992.50
E Overhead & Profit 15% x D 7,198.88
F Harga Satuan Pekerjaan (D+E) 55,191.38
A. 4.5.2.37 Pemasangan 1 m' Nok Sirap 46,730.25

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.125 67,500.00 8,437.50
Tukang Kayu L.02 OH 0.250 81,000.00 20,250.00
Kepala Tukang L.03 OH 0.025 85,500.00 2,137.50
Mandor L.04 OH 0.006 90,000.00 540.00
JUMLAH TENAGA KERJA 31,365.00
B BAHAN
Seng Plaat 3" x 6" BJLS 28 Lbr 0.400 19,800.00 7,920.00
Paku Biasa 1/2" - 1" Kg 0.050 13,500.00 675.00
Paku Biasa 2" - 5" Kg 0.050 13,500.00 675.00
JUMLAH HARGA BAHAN 9,270.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 40,635.00
E Overhead & Profit 15% x D 6,095.25
F Harga Satuan Pekerjaan (D+E) 46,730.25

A. 4.5.2.38 Pemasangan 1 m2 Atap Seng Gelombang 32,364.45

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.120 67,500.00 8,100.00
Tukang Kayu L.02 OH 0.060 81,000.00 4,860.00
Kepala Tukang L.03 OH 0.006 85,500.00 513.00
Mandor L.04 OH 0.006 90,000.00 540.00
JUMLAH TENAGA KERJA 14,013.00
B BAHAN
Seng Gelombang 3" x 6" BJLS 28 Lbr 0.700 19,800.00 13,860.00
Paku Biasa 1/2" - 1" Kg 0.020 13,500.00 270.00
JUMLAH HARGA BAHAN 14,130.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 28,143.00
E Overhead & Profit 15% x D 4,221.45
F Harga Satuan Pekerjaan (D+E) 32,364.45

A. 4.5.2.39 Pemasangan 1 m' Atap Nok Seng 26,925.53

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.150 67,500.00 10,125.00
Tukang Kayu L.02 OH 0.070 81,000.00 5,670.00
Kepala Tukang L.03 OH 0.007 85,500.00 598.50
Mandor L.04 OH 0.006 90,000.00 540.00
JUMLAH TENAGA KERJA 16,933.50
B BAHAN
Seng Plaat 3" x 6" BJLS 28 Lbr 0.300 19,800.00 5,940.00
Paku Biasa 1/2" - 1" Kg 0.040 13,500.00 540.00
JUMLAH HARGA BAHAN 6,480.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah A + B + C 23,413.50
E Overhead & Profit 15% x D 3,512.03
F Harga Satuan Pekerjaan (D+E) 26,925.53

A. 4.5.2.42 Pemasangan 1 m2 Allumunium Foil / Sisalation 26,858.25

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.150 67,500.00 10,125.00
Tukang Kayu L.02 OH 0.050 81,000.00 4,050.00
Kepala Tukang L.03 OH 0.005 85,500.00 427.50
Mandor L.04 OH 0.008 90,000.00 720.00
JUMLAH TENAGA KERJA 15,322.50
B BAHAN
Sisalation / Allumunium Foil m2 1.050 7,650.00 8,032.50
JUMLAH HARGA BAHAN 8,032.50
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 23,355.00
E Overhead & Profit 15% x D 3,503.25
F Harga Satuan Pekerjaan (D+E) 26,858.25

Dihitung Pemasangan 1 m2 Atap Spandek Berpasir 130,047.75

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.020 67,500.00 1,350.00
Tukang Kayu L.02 OH 0.080 81,000.00 6,480.00
Kepala Tukang L.03 OH 0.010 85,500.00 855.00
Mandor L.04 OH 0.006 90,000.00 540.00
JUMLAH TENAGA KERJA 9,225.00
B BAHAN
Atap Spandek M2 1.100 84,600.00 93,060.00
Screw Cteks 12-4 x 50 bh 6.000 1,500.00 9,000.00
Screw Cteks 10 x 16-16 bh 2.000 900.00 1,800.00
JUMLAH HARGA BAHAN 103,860.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 113,085.00
E Overhead & Profit 15% x D 16,962.75
F Harga Satuan Pekerjaan (D+E) 130,047.75

Dihitung Pemasangan 1 m' Nok Atap Spandek Berpasir 114,160.50

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.020 67,500.00 1,350.00
Tukang Kayu L.02 OH 0.080 81,000.00 6,480.00
Kepala Tukang L.03 OH 0.010 85,500.00 855.00
Mandor L.04 OH 0.006 90,000.00 540.00
JUMLAH TENAGA KERJA 9,225.00
B BAHAN
Nok Atap Spandek M' 1.100 76,950.00 84,645.00
Screw Cteks 10 x 16-16 bh 6.000 900.00 5,400.00
JUMLAH HARGA BAHAN 90,045.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 99,270.00
E Overhead & Profit 15% x D 14,890.50
F Harga Satuan Pekerjaan (D+E) 114,160.50
A. 4.6.1.HARGA SATUAN PEKERJAAN KAYU
A. 4.6.1.1 Pembuatan dan Pemasangan 1 m3 Kosen Pintu & Jendela Kayu klas I ( Kayu Jati ) 27,824,784.75

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 7.000 67,500.00 472,500.00
Tukang Kayu L.02 OH 21.000 81,000.00 1,701,000.00
Kepala Tukang L.03 OH 2.100 85,500.00 179,550.00
Mandor L.04 OH 0.350 90,000.00 31,500.00
JUMLAH TENAGA KERJA 2,384,550.00
B BAHAN
Kayu Klas I (Jati) , Balok m3 1.100 19,800,000.00 21,780,000.00
Paku Biasa 2" - 5 " kg 1.250 13,500.00 16,875.00
Lem Kayu kg 1.000 14,040.00 14,040.00
JUMLAH HARGA BAHAN 21,810,915.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 24,195,465.00
E Overhead & Profit 15% x D 3,629,319.75
F Harga Satuan Pekerjaan (D+E) 27,824,784.75

A. 4.6.1.2 Pembuatan dan Pemasangan 1 m3 Kosen Pintu & Jendela Kayu klas II atau III ( Kayu 12,073,637.25

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 6.000 67,500.00 405,000.00
Tukang Kayu L.02 OH 18.000 81,000.00 1,458,000.00
Kepala Tukang L.03 OH 1.800 85,500.00 153,900.00
Mandor L.04 OH 0.300 90,000.00 27,000.00
JUMLAH TENAGA KERJA 2,043,900.00
B BAHAN
Kayu Klas II (Kruing) , Balok m3 1.200 7,020,000.00 8,424,000.00
Paku Biasa 2" - 5 " kg 1.250 13,500.00 16,875.00
Lem Kayu kg 1.000 14,040.00 14,040.00
JUMLAH HARGA BAHAN 8,454,915.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 10,498,815.00
E Overhead & Profit 15% x D 1,574,822.25
F Harga Satuan Pekerjaan (D+E) 12,073,637.25

A. 4.6.1.3 Pembuatan dan Pemasangan 1 m2 Pintu KlampStandard Kayu Klas II (Kayu Kamfer) 593,339.63

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.350 67,500.00 23,625.00
Tukang Kayu L.02 OH 1.050 81,000.00 85,050.00
Kepala Tukang L.03 OH 0.105 85,500.00 8,977.50
Mandor L.04 OH 0.018 90,000.00 1,620.00
JUMLAH TENAGA KERJA 119,272.50
B BAHAN
Kayu Klas II (Kamfer), papan m3 0.040 9,900,000.00 396,000.00
Paku Biasa 2" - 5 " Kg 0.050 13,500.00 675.00
JUMLAH HARGA BAHAN 396,675.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah A + B + C 515,947.50
E Overhead & Profit 15% x D 77,392.13
F Harga Satuan Pekerjaan (D+E) 593,339.63

A. 4.6.1.4 Pembuatan dan Pemasangan 1 m2 Daun Pintu Klamp Sederhana Kayu Klas III ( Kayu 593,339.63

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.350 67,500.00 23,625.00
Tukang Kayu L.02 OH 1.050 81,000.00 85,050.00
Kepala Tukang L.03 OH 0.105 85,500.00 8,977.50
Mandor L.04 OH 0.018 90,000.00 1,620.00
JUMLAH TENAGA KERJA 119,272.50
B BAHAN
Kayu Klas II (Kamfer), papan m3 0.040 9,900,000.00 396,000.00
Paku Biasa 2" - 5 " Kg 0.050 13,500.00 675.00
JUMLAH HARGA BAHAN 396,675.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 515,947.50
E Overhead & Profit 15% x D 77,392.13
F Harga Satuan Pekerjaan (D+E) 593,339.63

A. 4.6.1.5 Pembuatan dan Pemasangan 1 m2 Daun Pintu Panel, Kayu Klas I atau II ( Kayu Kamfe 855,220.50

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 1.000 67,500.00 67,500.00
Tukang Kayu L.02 OH 3.000 81,000.00 243,000.00
Kepala Tukang L.03 OH 0.300 85,500.00 25,650.00
Mandor L.04 OH 0.050 90,000.00 4,500.00
JUMLAH TENAGA KERJA 340,650.00
B BAHAN
Kayu Klas II (Kamfer), papan m3 0.040 9,900,000.00 396,000.00
Lem Kayu kg 0.500 14,040.00 7,020.00
JUMLAH HARGA BAHAN 403,020.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 743,670.00
E Overhead & Profit 15% x D 111,550.50
F Harga Satuan Pekerjaan (D+E) 855,220.50

A. 4.6.1.6 Pembuatan dan Pemasangan 1 m2 Pintu & Jendela Kaca Kayu Klas I atau II ( Kayu Ka 591,481.80

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.800 67,500.00 54,000.00
Tukang Kayu L.02 OH 2.400 81,000.00 194,400.00
Kepala Tukang L.03 OH 0.240 85,500.00 20,520.00
Mandor L.04 OH 0.040 90,000.00 3,600.00
JUMLAH TENAGA KERJA 272,520.00
B BAHAN
Kayu Klas II (Kamfer), papan m3 0.024 9,900,000.00 237,600.00
Lem Kayu kg 0.300 14,040.00 4,212.00
JUMLAH HARGA BAHAN 241,812.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 514,332.00
E Overhead & Profit 15% x D 77,149.80
F Harga Satuan Pekerjaan (D+E) 591,481.80

A. 4.6.1.7 Pembuatan dan Pemasangan 1 m2 Pintu & Jendela Jalusi Kayu Klas I atau II ( Kayu Ja 1,757,740.50

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 1.000 67,500.00 67,500.00
Tukang Kayu L.02 OH 3.000 81,000.00 243,000.00
Kepala Tukang L.03 OH 0.300 85,500.00 25,650.00
Mandor L.04 OH 0.050 90,000.00 4,500.00
JUMLAH TENAGA KERJA 340,650.00
B BAHAN
Kayu Klas I (Jati), papan m3 0.064 18,450,000.00 1,180,800.00
Lem Kayu kg 0.500 14,040.00 7,020.00
JUMLAH HARGA BAHAN 1,187,820.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 1,528,470.00
E Overhead & Profit 15% x D 229,270.50
F Harga Satuan Pekerjaan (D+E) 1,757,740.50

A. 4.6.1.8 Pembuatan dan Pemasangan 1 m2 Pintu kayu lapis (Plywood) Rangkap rangka Kayu Kla 645,012.00

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.700 67,500.00 47,250.00
Tukang Kayu L.02 OH 2.100 81,000.00 170,100.00
Kepala Tukang L.03 OH 0.210 85,500.00 17,955.00
Mandor L.04 OH 0.035 90,000.00 3,150.00
JUMLAH TENAGA KERJA 238,455.00
B BAHAN
Kayu Klas II (Kamfer), papan m3 0.025 9,900,000.00 247,500.00
Paku Biasa 1/2" - 1" Kg 0.030 13,500.00 405.00
Lem Kayu Kg 0.500 14,040.00 7,020.00
Plywood tebal 4 mm uk.90x220cm Lbr 1.000 67,500.00 67,500.00
JUMLAH HARGA BAHAN 322,425.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 560,880.00
E Overhead & Profit 15% x D 84,132.00
F Harga Satuan Pekerjaan (D+E) 645,012.00

A. 4.6.1.9 Pembuatan dan Pemasangan 1 m2 Pintu Plywood rangkap, rangka expose kayu klas I a 691,017.75

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.800 67,500.00 54,000.00
Tukang Kayu L.02 OH 2.400 81,000.00 194,400.00
Kepala Tukang L.03 OH 0.240 85,500.00 20,520.00
Mandor L.04 OH 0.040 90,000.00 3,600.00
JUMLAH TENAGA KERJA 272,520.00
B BAHAN
Kayu Klas II (Kamfer), papan m3 0.026 9,900,000.00 253,440.00
Paku Biasa 1/2" - 1" Kg 0.030 13,500.00 405.00
Lem Kayu kg 0.500 14,040.00 7,020.00
Plywood tebal 4 mm uk.90x220cm Lbr 1.000 67,500.00 67,500.00
JUMLAH HARGA BAHAN 328,365.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 600,885.00
E Overhead & Profit 15% x D 90,132.75
F Harga Satuan Pekerjaan (D+E) 691,017.75

A. 4.6.1.10 Pembuatan dan Pemasangan 1 m2 Jalusi mati Kosen Kayu Klas I atau II ( Kayu Jati ) 1,568,025.00

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.670 67,500.00 45,225.00
Tukang Kayu L.02 OH 2.000 81,000.00 162,000.00
Kepala Tukang L.03 OH 0.200 85,500.00 17,100.00
Mandor L.04 OH 0.335 90,000.00 30,150.00
JUMLAH TENAGA KERJA 254,475.00
B BAHAN
Kayu Klas I (Jati), papan m3 0.060 18,450,000.00 1,107,000.00
Paku Biasa 1/2" - 1" Kg 0.150 13,500.00 2,025.00
JUMLAH HARGA BAHAN 1,109,025.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 1,363,500.00
E Overhead & Profit 15% x D 204,525.00
F Harga Satuan Pekerjaan (D+E) 1,568,025.00

A. 4.6.1.11 Pembuatan dan Pemasangan 1 m2n Pintu Teakwood Rangkap, Rangka Expose Kayu Klas 926,770.05

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.800 67,500.00 54,000.00
Tukang Kayu L.02 OH 2.400 81,000.00 194,400.00
Kepala Tukang L.03 OH 0.240 85,500.00 20,520.00
Mandor L.04 OH 0.040 90,000.00 3,600.00
JUMLAH TENAGA KERJA 272,520.00
B BAHAN
Kayu Klas I (Jati), papan m3 0.025 18,450,000.00 461,250.00
Paku Biasa 1/2" - 1" Kg 0.030 13,500.00 405.00
Lem Kayu kg 0.300 14,040.00 4,212.00
Teakwood (90 x 220) cm x 4 mm Lbr 1.000 67,500.00 67,500.00
JUMLAH HARGA BAHAN 533,367.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 805,887.00
E Overhead & Profit 15% x D 120,883.05
F Harga Satuan Pekerjaan (D+E) 926,770.05

A. 4.6.1.12 Pembuatan dan Pemasangan 1 m2 Pintu Teakwood Rangkap Lapis Formika,Rangka expo 735,339.56
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.850 67,500.00 57,375.00
Tukang Kayu L.02 OH 2.550 81,000.00 206,550.00
Kepala Tukang L.03 OH 0.255 85,500.00 21,802.50
Mandor L.04 OH 0.043 90,000.00 3,870.00
JUMLAH TENAGA KERJA 289,597.50
B BAHAN
Kayu Klas II (Kamfer), papan m3 0.025 9,900,000.00 247,500.00
Paku Biasa 1/2" - 1" Kg 0.030 13,500.00 405.00
Lem Kayu kg 0.080 14,040.00 1,123.20
Teakwood (90 x 220) cm x 4 mm Lbr 1.000 67,500.00 67,500.00
Formika Lbr 0.5 66,600.00 33,300.00
JUMLAH HARGA BAHAN 349,828.20
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 639,425.70
E Overhead & Profit 15% x D 95,913.86
F Harga Satuan Pekerjaan (D+E) 735,339.56

A. 4.6.1.13 Pembuatan dan Pemasangan 1 m3 Konstruksi Kuda-kuda Konvensional Kayu I; II & III 10,736,055.00

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 4.000 67,500.00 270,000.00
Tukang Kayu L.02 OH 12.000 81,000.00 972,000.00
Kepala Tukang L.03 OH 1.200 85,500.00 102,600.00
Mandor L.04 OH 0.200 90,000.00 18,000.00
JUMLAH TENAGA KERJA 1,362,600.00
B BAHAN
Kayu Kruing, balok m3 1.100 7,020,000.00 7,722,000.00
Besi Strip Kg 15.000 11,700.00 175,500.00
Paku Biasa 2" - 5" Kg 5.600 13,500.00 75,600.00
JUMLAH HARGA BAHAN 7,973,100.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 9,335,700.00
E Overhead & Profit 15% x D 1,400,355.00
F Harga Satuan Pekerjaan (D+E) 10,736,055.00

A. 4.6.1.14 Pembuatan dan Pemasangan 1 m3 Konstruksi Kuda-kuda Expose, Kayu Klas I ( Kayu Ja 30,237,473.25

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 6.700 67,500.00 452,250.00
Tukang Kayu L.02 OH 20.100 81,000.00 1,628,100.00
Kepala Tukang L.03 OH 2.010 85,500.00 171,855.00
Mandor L.04 OH 0.335 90,000.00 30,150.00
JUMLAH TENAGA KERJA 2,282,355.00
B BAHAN
Kayu Klas I (jati), balok m3 1.200 19,800,000.00 23,760,000.00
Besi Strip Kg 15.000 11,700.00 175,500.00
Paku Biasa 2" - 5" Kg 5.600 13,500.00 75,600.00
JUMLAH HARGA BAHAN 24,011,100.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah A + B + C 26,293,455.00
E Overhead & Profit 15% x D 3,944,018.25
F Harga Satuan Pekerjaan (D+E) 30,237,473.25

A. 4.6.1.15 Pemasangan 1 m3 konstruksi Gording, Kayu Klas II ( Kayu Kruing ) 11,753,408.25

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 6.700 67,500.00 452,250.00
Tukang Kayu L.02 OH 20.100 81,000.00 1,628,100.00
Kepala Tukang L.03 OH 2.010 85,500.00 171,855.00
Mandor L.04 OH 0.335 90,000.00 30,150.00
JUMLAH TENAGA KERJA 2,282,355.00
B BAHAN
Kayu Klas II (Kruing), balok m3 1.100 7,020,000.00 7,722,000.00
Besi Strip Kg 15.000 11,700.00 175,500.00
Paku Biasa 2" - 5" Kg 3.000 13,500.00 40,500.00
JUMLAH HARGA BAHAN 7,938,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 10,220,355.00
E Overhead & Profit 15% x D 1,533,053.25
F Harga Satuan Pekerjaan (D+E) 11,753,408.25

A. 4.6.1.16 Pemasangan 1 m2 Rangka Atap Genteng Keramik, Kayu Klas II ( Kayu Kruing ) 164,544.30

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.100 67,500.00 6,750.00
Tukang Kayu L.02 OH 0.100 81,000.00 8,100.00
Kepala Tukang L.03 OH 0.010 85,500.00 855.00
Mandor L.04 OH 0.005 90,000.00 450.00
JUMLAH TENAGA KERJA 16,155.00
B BAHAN
Kayu Klas II (Kruing), Kaso-kaso (5x7) cm m3 0.014 7,020,000.00 98,280.00
Reng (2x3) cm m3 0.0036 7,020,000.00 25,272.00
Paku Biasa 2" - 5" Kg 0.250 13,500.00 3,375.00
JUMLAH HARGA BAHAN 126,927.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 143,082.00
E Overhead & Profit 15% x D 21,462.30
F Harga Satuan Pekerjaan (D+E) 164,544.30

A. 4.6.1.17 Pemasangan 1 m2 Rangka Atap Genteng Beton, Kayu Klas II ( Kayu Kruing ) 193,607.10

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.100 67,500.00 6,750.00
Tukang Kayu L.02 OH 0.100 81,000.00 8,100.00
Kepala Tukang L.03 OH 0.010 85,500.00 855.00
Mandor L.04 OH 0.005 90,000.00 450.00
JUMLAH TENAGA KERJA 16,155.00
B BAHAN
Kayu Klas II (Kruing), Kaso-kaso (5x7) cm m3 0.014 7,020,000.00 98,280.00
Reng (3x4) cm m3 0.0072 7,020,000.00 50,544.00
Paku Biasa 2" - 5" Kg 0.250 13,500.00 3,375.00
JUMLAH HARGA BAHAN 152,199.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 168,354.00
E Overhead & Profit 15% x D 25,253.10
F Harga Satuan Pekerjaan (D+E) 193,607.10

A. 4.6.1.18 Pemasangan 1 m2 Rangka Atap Sirap, Kayu Klas II ( Kayu Kruing ) 138,420.90

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.120 67,500.00 8,100.00
Tukang Kayu L.02 OH 0.120 81,000.00 9,720.00
Kepala Tukang L.03 OH 0.012 85,500.00 1,026.00
Mandor L.04 OH 0.006 90,000.00 540.00
JUMLAH TENAGA KERJA 19,386.00
B BAHAN
Kayu Klas II (Kruing), balok m3 0.014 7,020,000.00 98,280.00
Paku Biasa 2" - 5" Kg 0.2 13,500.00 2,700.00
JUMLAH HARGA BAHAN 100,980.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 120,366.00
E Overhead & Profit 15% x D 18,054.90
F Harga Satuan Pekerjaan (D+E) 138,420.90

A. 4.6.1.19 Pemasangan 1 m2 Rangka Langit-langit (50x1,00) m, kayu Klas II atau III ( Kayu Mer 137,882.70

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.150 67,500.00 10,125.00
Tukang Kayu L.02 OH 0.300 81,000.00 24,300.00
Kepala Tukang L.03 OH 0.030 85,500.00 2,565.00
Mandor L.04 OH 0.075 90,000.00 6,750.00
JUMLAH TENAGA KERJA 43,740.00
B BAHAN
Kayu Klas III (Meranti), balok m3 0.0154 4,770,000.00 73,458.00
Paku Biasa 2" - 5" Kg 0.200 13,500.00 2,700.00
JUMLAH HARGA BAHAN 76,158.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 119,898.00
E Overhead & Profit 15% x D 17,984.70
F Harga Satuan Pekerjaan (D+E) 137,882.70

A. 4.6.1.20 Pemasangan 1 m2 Rangka Langit-langit (60x60) cm, kayu Klas II atau III ( Kayu Mera 140,749.65

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.200 67,500.00 13,500.00
Tukang Kayu L.02 OH 0.300 81,000.00 24,300.00
Kepala Tukang L.03 OH 0.030 85,500.00 2,565.00
Mandor L.04 OH 0.010 90,000.00 900.00
JUMLAH TENAGA KERJA 41,265.00
B BAHAN
Kayu Klas III (Meranti), balok m3 0.0163 4,770,000.00 77,751.00
Paku Biasa 2" - 5" Kg 0.250 13,500.00 3,375.00
JUMLAH HARGA BAHAN 81,126.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 122,391.00
E Overhead & Profit 15% x D 18,358.65
F Harga Satuan Pekerjaan (D+E) 140,749.65

A. 4.6.1.21 Pemasangan 1 m' Listplank Uk. (3x20)cm Kayu klas I atau II ( Kayu Jati ) 259,578.00

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.100 67,500.00 6,750.00
Tukang Kayu L.02 OH 0.200 81,000.00 16,200.00
Kepala Tukang L.03 OH 0.020 85,500.00 1,710.00
Mandor L.04 OH 0.005 90,000.00 450.00
JUMLAH TENAGA KERJA 25,110.00
B BAHAN
Kayu klas I (Jati), papan m3 0.0108 18,450,000.00 199,260.00
Paku Biasa 2" - 5" Kg 0.100 13,500.00 1,350.00
JUMLAH HARGA BAHAN 200,610.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 225,720.00
E Overhead & Profit 15% x D 33,858.00
F Harga Satuan Pekerjaan (D+E) 259,578.00

A. 4.6.1.22 Pemasangan 1 m' Listplank Uk. (3x30)cm Kayu klas I atau klas II ( Kayu Kruing ) 177,657.75

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.100 67,500.00 6,750.00
Tukang Kayu L.02 OH 0.200 81,000.00 16,200.00
Kepala Tukang L.03 OH 0.020 85,500.00 1,710.00
Mandor L.04 OH 0.005 90,000.00 450.00
JUMLAH TENAGA KERJA 25,110.00
B BAHAN
Kayu klas II (Kruing), papan m3 0.011 11,700,000.00 128,700.00
Paku Biasa 2" - 5" Kg 0.050 13,500.00 675.00
JUMLAH HARGA BAHAN 129,375.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 154,485.00
E Overhead & Profit 15% x D 23,172.75
F Harga Satuan Pekerjaan (D+E) 177,657.75

A. 4.6.1.23 Pemasangan 1 m2 Rangka Dinding Pemisah (60x120) cm Kayu klas II atau III ( Kayu 287,186.63
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.150 67,500.00 10,125.00
Tukang Kayu L.02 OH 0.450 81,000.00 36,450.00
Kepala Tukang L.03 OH 0.045 85,500.00 3,847.50
Mandor L.04 OH 0.008 90,000.00 720.00
JUMLAH TENAGA KERJA 51,142.50
B BAHAN
Kayu klas II (Kruing), balok m3 0.028 7,020,000.00 196,560.00
Paku Biasa 2" - 5" Kg 0.150 13,500.00 2,025.00
JUMLAH HARGA BAHAN 198,585.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 249,727.50
E Overhead & Profit 15% x D 37,459.13
F Harga Satuan Pekerjaan (D+E) 287,186.63

A. 4.6.1.24 Pemasangan 1 m2 Dinding Pemisah Teakwood Rangkap Rangka Kayu Klas II ( Kayu Kr 362,985.89

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.150 67,500.00 10,125.00
Tukang Kayu L.02 OH 0.450 81,000.00 36,450.00
Kepala Tukang L.03 OH 0.045 85,500.00 3,847.50
Mandor L.04 OH 0.008 90,000.00 720.00
JUMLAH TENAGA KERJA 51,142.50
B BAHAN
Kayu klas II (Kruing), balok m3 0.028 7,020,000.00 196,560.00
Paku Biasa 2" - 5" Kg 0.150 13,500.00 2,025.00
Teakwood 120 x 240 cm tebal 4mm Lbr 0.860 67,500.00 58,050.00
Lem Ltr 0.560 14,040.00 7,862.40
JUMLAH HARGA BAHAN 264,497.40
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 315,639.90
E Overhead & Profit 15% x D 47,345.99
F Harga Satuan Pekerjaan (D+E) 362,985.89

A. 4.6.1.25 Pemasangan 1 m2 Dinding Pemisah Plywood Rangkap Rangka Kayu Klas II ( Kayu Kru 368,549.01

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.020 67,500.00 1,350.00
Tukang Kayu L.02 OH 0.600 81,000.00 48,600.00
Kepala Tukang L.03 OH 0.060 85,500.00 5,130.00
Mandor L.04 OH 0.010 90,000.00 900.00
JUMLAH TENAGA KERJA 55,980.00
B BAHAN
Kayu klas II (Kruing), balok m3 0.028 7,020,000.00 196,560.00
Paku Biasa 2" - 5" Kg 0.150 13,500.00 2,025.00
Plywood 120 x 240 cm tebal 4mm Lbr 0.860 67,500.00 58,050.00
Lem Ltr 0.560 14,040.00 7,862.40
JUMLAH HARGA BAHAN 264,497.40
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah A + B + C 320,477.40
E Overhead & Profit 15% x D 48,071.61
F Harga Satuan Pekerjaan (D+E) 368,549.01

A. 4.6.1.26 Pemasangan 1 m2 Dinding Lambrisering dari Papan klas I ( Kayu Jati ) 386,908.88

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA 204,390.00
Pekerja L.01 OH 0.600 67,500.00 40,500.00
Tukang Kayu L.02 OH 1.800 81,000.00 145,800.00
Kepala Tukang L.03 OH 0.180 85,500.00 15,390.00
Mandor L.04 OH 0.030 90,000.00 2,700.00
JUMLAH TENAGA KERJA 204,390.00
B BAHAN
Kayu klas I (Jati), papan m3 0.007 18,450,000.00 129,150.00
Paku Biasa 2" - 5" Kg 0.100 13,500.00 1,350.00
Paku Sekrup 3,5" Kg 0.150 10,350.00 1,552.50
JUMLAH HARGA BAHAN 132,052.50
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 336,442.50
E Overhead & Profit 15% x D 50,466.38
F Harga Satuan Pekerjaan (D+E) 386,908.88

A. 4.6.1.27 Pemasangan 1 m2 Dinding Lambrisering dari Plywood ukuran (120x240) cm 41,643.23

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.025 67,500.00 1,687.50
Tukang Kayu L.02 OH 0.075 81,000.00 6,075.00
Kepala Tukang L.03 OH 0.0080 85,500.00 684.00
Mandor L.04 OH 0.0010 90,000.00 90.00
JUMLAH TENAGA KERJA 8,536.50
B BAHAN
Plywood (120 X 240) cm x 4mm Lbr 0.400 67,500.00 27,000.00
Paku Biasa 1/2" - 1" Kg 0.050 13,500.00 675.00
JUMLAH HARGA BAHAN 27,675.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 36,211.50
E Overhead & Profit 15% x D 5,431.73
F Harga Satuan Pekerjaan (D+E) 41,643.23

A. 4.6.1.28 Pemasangan 1 m2 Dinding Bilik, Rangka Kayu Klas III atau IV ( Kayu Meranti ) 125,366.19

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.100 67,500.00 6,750.00
Tukang Kayu L.02 OH 0.050 81,000.00 4,050.00
Kepala Tukang L.03 OH 0.005 85,500.00 427.50
Mandor L.04 OH 0.005 90,000.00 450.00
JUMLAH TENAGA KERJA 11,677.50
B BAHAN
Bilik Bambu m2 1.500 20,250.00 30,375.00
Kayu Klas III (Meranti) m3 0.014 4,770,000.00 66,780.00
Paku Biasa 1/2" - 1" Kg 0.012 13,500.00 162.00
List Kayu 2/4 m' 0.003 6,525.00 19.58
JUMLAH HARGA BAHAN 97,336.58
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 109,014.08
E Overhead & Profit 15% x D 16,352.11
F Harga Satuan Pekerjaan (D+E) 125,366.19

A. 4.6.1.2 Pembuatan dan Pemasangan 1 m3 Kosen Pintu & Jendela ( Kayu Kruing ) 12,073,637.25

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 6.000 67,500.00 405,000.00
Tukang Kayu L.02 OH 18.000 81,000.00 1,458,000.00
Kepala Tukang L.03 OH 1.800 85,500.00 153,900.00
Mandor L.04 OH 0.300 90,000.00 27,000.00
JUMLAH TENAGA KERJA 2,043,900.00
B BAHAN
Kayu Kruing (Balok) m3 1.200 7,020,000.00 8,424,000.00
Paku Biasa 1/2" - 1" kg 1.250 13,500.00 16,875.00
Lem Kayu kg 1.000 14,040.00 14,040.00
JUMLAH HARGA BAHAN 8,454,915.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 10,498,815.00
E Overhead & Profit 15% x D 1,574,822.25
F Harga Satuan Pekerjaan (D+E) 12,073,637.25

A. 4.6.1.21 A Pemasangan 1 m' woodplank Uk. (2x20)cm 48,541.50

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.100 67,500.00 6,750.00
Tukang Kayu L.02 OH 0.200 81,000.00 16,200.00
Kepala Tukang L.03 OH 0.020 85,500.00 1,710.00
Mandor L.04 OH 0.005 90,000.00 450.00
JUMLAH TENAGA KERJA 25,110.00
B BAHAN
woodplank m' 1.0000 15,750.00 15,750.00
Paku Biasa 2" - 5" Kg 0.100 13,500.00 1,350.00
JUMLAH HARGA BAHAN 17,100.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 42,210.00
E Overhead & Profit 15% x D 6,331.50
F Harga Satuan Pekerjaan (D+E) 48,541.50

Dihitung Pembuatan 1 m2 Pelapis Dinding HPL Rangka Kayu Meranti 745,507.51

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.800 67,500.00 54,000.00
Tukang Kayu L.02 OH 2.400 81,000.00 194,400.00
Kepala Tukang L.03 OH 0.240 85,500.00 20,520.00
Mandor L.04 OH 0.040 90,000.00 3,600.00
JUMLAH TENAGA KERJA 272,520.00
B BAHAN
Kayu Klas II (meranti), balok m3 0.028 4,770,000.00 133,560.00
Paku Biasa 1/2" - 1" Kg 0.150 13,500.00 2,025.00
Lem Kayu kg 0.560 14,040.00 7,862.40
Multiplek tebal 6 mm uk.120x220cm Lbr 0.430 81,000.00 34,830.00
HPL Lbr 0.500 171,000.00 85,500.00
Lem Kuning Kg 0.350 34,200.00 11,970.00
Assesories ( list stainlees, kabel, stop kontak ) Ls 1.000 100,000.00 100,000.00
JUMLAH HARGA BAHAN 375,747.40
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 648,267.40
E Overhead & Profit 15% x D 97,240.11
F Harga Satuan Pekerjaan (D+E) 745,507.51
A. 4.6.2.HARGA SATUAN PEKERJAAN KUNCI DAN KACA
A. 4.6.2.2 Pemasangan 1 buah Kunci Tanam Biasa 210,105.00

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.010 67,500.00 675.00
Tukang Kayu L.02 OH 0.500 81,000.00 40,500.00
Kepala Tukang L.03 OH 0.050 85,500.00 4,275.00
Mandor L.04 OH 0.005 90,000.00 450.00
JUMLAH TENAGA KERJA 45,900.00
B BAHAN
Kunci Tanam Biasa Buah 1.000 136,800.00 136,800.00
JUMLAH HARGA BAHAN 136,800.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 182,700.00
E Overhead & Profit 15% x D 27,405.00
F Harga Satuan Pekerjaan (D+E) 210,105.00

A. 4.6.2.3 Pemasangan 1 buah Kunci Kamar Mandi 135,688.50

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.005 67,500.00 337.50
Tukang Kayu L.02 OH 0.500 81,000.00 40,500.00
Kepala Tukang L.03 OH 0.005 85,500.00 427.50
Mandor L.04 OH 0.0025 90,000.00 225.00
JUMLAH TENAGA KERJA 41,490.00
B BAHAN
Kunci Tanam Kamar Mandi Buah 1.000 76,500.00 76,500.00
JUMLAH HARGA BAHAN 76,500.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 117,990.00
E Overhead & Profit 15% x D 17,698.50
F Harga Satuan Pekerjaan (D+E) 135,688.50

A. 4.6.2.4 Pemasangan 1 buah Kunci Selinder 205,033.50

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.005 67,500.00 337.50
Tukang Kayu L.02 OH 0.500 81,000.00 40,500.00
Kepala Tukang L.03 OH 0.005 85,500.00 427.50
Mandor L.04 OH 0.0025 90,000.00 225.00
JUMLAH TENAGA KERJA 41,490.00
B BAHAN
Kunci Selinder Buah 1.000 136,800.00 136,800.00
JUMLAH HARGA BAHAN 136,800.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 178,290.00
E Overhead & Profit 15% x D 26,743.50
F Harga Satuan Pekerjaan (D+E) 205,033.50

A. 4.6.2.5 Pemasangan 1 buah Engsel Pintu 31,489.88

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.015 67,500.00 1,012.50
Tukang Kayu L.02 OH 0.150 81,000.00 12,150.00
Kepala Tukang L.03 OH 0.015 85,500.00 1,282.50
Mandor L.04 OH 0.0008 90,000.00 67.50
JUMLAH TENAGA KERJA 14,512.50
B BAHAN
Engsel pintu Buah 1.000 12,870.00 12,870.00
JUMLAH HARGA BAHAN 12,870.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 27,382.50
E Overhead & Profit 15% x D 4,107.38
F Harga Satuan Pekerjaan (D+E) 31,489.88

A. 4.6.2.6 Pemasangan 1 buah Engsel Jendela Kupu-kupu 30,739.50

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.010 67,500.00 675.00
Tukang Kayu L.02 OH 0.100 81,000.00 8,100.00
Kepala Tukang L.03 OH 0.010 85,500.00 855.00
Mandor L.04 OH 0.005 90,000.00 450.00
JUMLAH TENAGA KERJA 10,080.00
B BAHAN
Engsel Jendela Buah 1 16,650.00 16,650.00
JUMLAH HARGA BAHAN 16,650.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 26,730.00
E Overhead & Profit 15% x D 4,009.50
F Harga Satuan Pekerjaan (D+E) 30,739.50

A. 4.6.2.7 Pemasangan 1 buah Engsel Angin 55,320.75

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.100 67,500.00 6,750.00
Tukang Kayu L.02 OH 0.200 81,000.00 16,200.00
Kepala Tukang L.03 OH 0.020 85,500.00 1,710.00
Mandor L.04 OH 0.0005 90,000.00 45.00
JUMLAH TENAGA KERJA 24,705.00
B BAHAN
Engsel Angin Buah 1.000 23,400.00 23,400.00
JUMLAH HARGA BAHAN 23,400.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 48,105.00
E Overhead & Profit 15% x D 7,215.75
F Harga Satuan Pekerjaan (D+E) 55,320.75

A. 4.6.2.9 Pemasangan 1 buah Kait Angin 55,217.25

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.015 67,500.00 1,012.50
Tukang Kayu L.02 OH 0.150 81,000.00 12,150.00
Kepala Tukang L.03 OH 0.015 85,500.00 1,282.50
Mandor L.04 OH 0.008 90,000.00 720.00
JUMLAH TENAGA KERJA 15,165.00
B BAHAN
Kait Angin Buah 1.000 32,850.00 32,850.00
JUMLAH HARGA BAHAN 32,850.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 48,015.00
E Overhead & Profit 15% x D 7,202.25
F Harga Satuan Pekerjaan (D+E) 55,217.25

A. 4.6.2.10 Pasang 1 buah Door Closer 350,606.25

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.050 67,500.00 3,375.00
Tukang Kayu L.02 OH 0.500 81,000.00 40,500.00
Kepala Tukang L.03 OH 0.050 85,500.00 4,275.00
Mandor L.04 OH 0.0025 90,000.00 225.00
JUMLAH TENAGA KERJA 48,375.00
B BAHAN
Door Closer Buah 1.000 256,500.00 256,500.00
JUMLAH HARGA BAHAN 256,500.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 304,875.00
E Overhead & Profit 15% x D 45,731.25
F Harga Satuan Pekerjaan (D+E) 350,606.25

A. 4.6.2.11 Pemasangan 1 buah Kunci Selot 32,602.50

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.020 67,500.00 1,350.00
Tukang Kayu L.02 OH 0.200 81,000.00 16,200.00
Kepala Tukang L.03 OH 0.020 85,500.00 1,710.00
Mandor L.04 OH 0.001 90,000.00 90.00
JUMLAH TENAGA KERJA 19,350.00
B BAHAN
Kunci Selot Buah 1.000 9,000.00 9,000.00
JUMLAH HARGA BAHAN 9,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 28,350.00
E Overhead & Profit 15% x D 4,252.50
F Harga Satuan Pekerjaan (D+E) 32,602.50

A. 4.6.2.13 Pemasangan 1 buah Door Stop 57,701.25

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.010 67,500.00 675.00
Tukang Kayu L.02 OH 0.100 81,000.00 8,100.00
Kepala Tukang L.03 OH 0.010 85,500.00 855.00
Mandor L.04 OH 0.0005 90,000.00 45.00
JUMLAH TENAGA KERJA 9,675.00
B BAHAN
Door Stop Buah 1.000 40,500.00 40,500.00
JUMLAH HARGA BAHAN 40,500.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 50,175.00
E Overhead & Profit 15% x D 7,526.25
F Harga Satuan Pekerjaan (D+E) 57,701.25

A. 4.6.2.14 Pemasangan 1 buah Rel Pintu Dorong 289,282.50

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.060 67,500.00 4,050.00
Tukang Kayu L.02 OH 0.600 81,000.00 48,600.00
Kepala Tukang L.03 OH 0.060 85,500.00 5,130.00
Mandor L.04 OH 0.003 90,000.00 270.00
JUMLAH TENAGA KERJA 58,050.00
B BAHAN
Rel Pintu Dorong Buah 1.000 193,500.00 193,500.00
JUMLAH HARGA BAHAN 193,500.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 251,550.00
E Overhead & Profit 15% x D 37,732.50
F Harga Satuan Pekerjaan (D+E) 289,282.50

A. 4.6.2.15 Pemasangan 1 buah Kunci Lemari 35,583.30

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.025 67,500.00 1,687.50
Tukang Kayu L.02 OH 0.250 81,000.00 20,250.00
Kepala Tukang L.03 OH 0.025 85,500.00 2,137.50
Mandor L.04 OH 0.0013 90,000.00 117.00
JUMLAH TENAGA KERJA 24,192.00
B BAHAN
Kunci Lemari Buah 1.000 6,750.00 6,750.00
JUMLAH HARGA BAHAN 6,750.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 30,942.00
E Overhead & Profit 15% x D 4,641.30
F Harga Satuan Pekerjaan (D+E) 35,583.30

A. 4.6.2.16 Pemasangan 1 m2 Kaca tebal 3 mm 110,615.63

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.015 67,500.00 1,012.50
Tukang Kayu L.02 OH 0.150 81,000.00 12,150.00
Kepala Tukang L.03 OH 0.015 85,500.00 1,282.50
Mandor L.04 OH 0.0008 90,000.00 67.50
JUMLAH TENAGA KERJA 14,512.50
B BAHAN
Kaca tebal 3mm m2 1.100 74,250.00 81,675.00
JUMLAH HARGA BAHAN 81,675.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 96,187.50
E Overhead & Profit 15% x D 14,428.13
F Harga Satuan Pekerjaan (D+E) 110,615.63

A. 4.6.2.17 Pemasangan 1 m2 Kaca tebal 5 mm 159,001.88

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.015 67,500.00 1,012.50
Tukang Kayu L.02 OH 0.150 81,000.00 12,150.00
Kepala Tukang L.03 OH 0.015 85,500.00 1,282.50
Mandor L.04 OH 0.0008 90,000.00 67.50
JUMLAH TENAGA KERJA 14,512.50
B BAHAN
Kaca tebal 5mm m2 1.100 112,500.00 123,750.00
JUMLAH HARGA BAHAN 123,750.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 138,262.50
E Overhead & Profit 15% x D 20,739.38
F Harga Satuan Pekerjaan (D+E) 159,001.88

A. 4.6.2.18 Pemasangan 1 m2 Kaca Cermin tebal 5 mm 286,462.13

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.017 67,500.00 1,147.50
Tukang Kayu L.02 OH 0.170 81,000.00 13,770.00
Kepala Tukang L.03 OH 0.017 85,500.00 1,453.50
Mandor L.04 OH 0.0009 90,000.00 76.50
JUMLAH TENAGA KERJA 16,447.50
B BAHAN
Kaca Cermin m2 1.100 211,500.00 232,650.00
JUMLAH HARGA BAHAN 232,650.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 249,097.50
E Overhead & Profit 15% x D 37,364.63
F Harga Satuan Pekerjaan (D+E) 286,462.13

A. 4.6.2.20 Pasang Lockset Swing Door 276,552.00

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.010 67,500.00 675.00
Tukang Kayu L.02 OH 0.500 81,000.00 40,500.00
Kepala Tukang L.03 OH 0.010 85,500.00 855.00
Mandor L.04 OH 0.0050 90,000.00 450.00
JUMLAH TENAGA KERJA 42,480.00
B BAHAN
Lockset Swing Door Bh 1.000 198,000.00 198,000.00
JUMLAH HARGA BAHAN 198,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 240,480.00
E Overhead & Profit 15% x D 36,072.00
F Harga Satuan Pekerjaan (D+E) 276,552.00

A. 4.6.2.21 Pasang Rambuncis 58,089.38

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.015 67,500.00 1,012.50
Tukang Kayu L.02 OH 0.150 81,000.00 12,150.00
Kepala Tukang L.03 OH 0.015 85,500.00 1,282.50
Mandor L.04 OH 0.0008 90,000.00 67.50
JUMLAH TENAGA KERJA 14,512.50
B BAHAN
Rambuncis Bh 1.000 36,000.00 36,000.00
JUMLAH HARGA BAHAN 36,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 50,512.50
E Overhead & Profit 15% x D 7,576.88
F Harga Satuan Pekerjaan (D+E) 58,089.38

A. 4.6.2.22 Pasang Flush Bolt 161,589.38

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.015 67,500.00 1,012.50
Tukang Kayu L.02 OH 0.150 81,000.00 12,150.00
Kepala Tukang L.03 OH 0.015 85,500.00 1,282.50
Mandor L.04 OH 0.0008 90,000.00 67.50
JUMLAH TENAGA KERJA 14,512.50
B BAHAN
Flush Bolt Bh 1.000 126,000.00 126,000.00
JUMLAH HARGA BAHAN 126,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 140,512.50
E Overhead & Profit 15% x D 21,076.88
F Harga Satuan Pekerjaan (D+E) 161,589.38

A. 4.6.2.23 Pasang Engsel Casement 63,264.38

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.015 67,500.00 1,012.50
Tukang Kayu L.02 OH 0.150 81,000.00 12,150.00
Kepala Tukang L.03 OH 0.015 85,500.00 1,282.50
Mandor L.04 OH 0.0008 90,000.00 67.50
JUMLAH TENAGA KERJA 14,512.50
B BAHAN
Engsel Casement Bh 1.000 40,500.00 40,500.00
JUMLAH HARGA BAHAN 40,500.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 55,012.50
E Overhead & Profit 15% x D 8,251.88
F Harga Satuan Pekerjaan (D+E) 63,264.38

A. 4.6.2.24 Pasang Lever Handle pintu Aluminium 80,109.00

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.020 67,500.00 1,350.00
Tukang Kayu L.02 OH 0.200 81,000.00 16,200.00
Kepala Tukang L.03 OH 0.020 85,500.00 1,710.00
Mandor L.04 OH 0.0100 90,000.00 900.00
JUMLAH TENAGA KERJA 20,160.00
B BAHAN
Lever Handle pintu aluminium Bh 1.000 49,500.00 49,500.00
JUMLAH HARGA BAHAN 49,500.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 69,660.00
E Overhead & Profit 15% x D 10,449.00
F Harga Satuan Pekerjaan (D+E) 80,109.00

A. 4.6.2.25 Pasang Floor Hinges 2,332,631.25

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.050 67,500.00 3,375.00
Tukang Kayu L.02 OH 0.500 81,000.00 40,500.00
Kepala Tukang L.03 OH 0.050 85,500.00 4,275.00
Mandor L.04 OH 0.0025 90,000.00 225.00
JUMLAH TENAGA KERJA 48,375.00
B BAHAN
Floor Hinges Set 1.000 1,980,000.00 1,980,000.00
JUMLAH HARGA BAHAN 1,980,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 2,028,375.00
E Overhead & Profit 15% x D 304,256.25
F Harga Satuan Pekerjaan (D+E) 2,332,631.25

A. 4.6.2.26 Pasang Top Patch Fitting 539,752.50

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.020 67,500.00 1,350.00
Tukang Kayu L.02 OH 0.200 81,000.00 16,200.00
Kepala Tukang L.03 OH 0.020 85,500.00 1,710.00
Mandor L.04 OH 0.0010 90,000.00 90.00
JUMLAH TENAGA KERJA 19,350.00
B BAHAN
Top Patch Fitting Set 1.000 450,000.00 450,000.00
JUMLAH HARGA BAHAN 450,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 469,350.00
E Overhead & Profit 15% x D 70,402.50
F Harga Satuan Pekerjaan (D+E) 539,752.50

A. 4.6.2.27 Pasang Bottom Patch Fitting 539,752.50

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.020 67,500.00 1,350.00
Tukang Kayu L.02 OH 0.200 81,000.00 16,200.00
Kepala Tukang L.03 OH 0.020 85,500.00 1,710.00
Mandor L.04 OH 0.0010 90,000.00 90.00
JUMLAH TENAGA KERJA 19,350.00
B BAHAN
Bottom Patch Fitting Set 1.000 450,000.00 450,000.00
JUMLAH HARGA BAHAN 450,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 469,350.00
E Overhead & Profit 15% x D 70,402.50
F Harga Satuan Pekerjaan (D+E) 539,752.50

A. 4.6.2.28 Pasang Bottom/Top Lock Patch Fitting 1,574,752.50

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.020 67,500.00 1,350.00
Tukang Kayu L.02 OH 0.200 81,000.00 16,200.00
Kepala Tukang L.03 OH 0.020 85,500.00 1,710.00
Mandor L.04 OH 0.0010 90,000.00 90.00
JUMLAH TENAGA KERJA 19,350.00
B BAHAN
Bottom /Top Lock Fitting Set 1.000 1,350,000.00 1,350,000.00
JUMLAH HARGA BAHAN 1,350,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 1,369,350.00
E Overhead & Profit 15% x D 205,402.50
F Harga Satuan Pekerjaan (D+E) 1,574,752.50

A. 4.6.2.29 Pasang Handle Pintu Frameless 850,252.50

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.020 67,500.00 1,350.00
Tukang Kayu L.02 OH 0.200 81,000.00 16,200.00
Kepala Tukang L.03 OH 0.020 85,500.00 1,710.00
Mandor L.04 OH 0.0010 90,000.00 90.00
JUMLAH TENAGA KERJA 19,350.00
B BAHAN
Handle Pintu Frameless Set 1.000 720,000.00 720,000.00
JUMLAH HARGA BAHAN 720,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 739,350.00
E Overhead & Profit 15% x D 110,902.50
F Harga Satuan Pekerjaan (D+E) 850,252.50

A. 4.6.2.30 Pasang Fixed Top Pin 229,252.50

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.020 67,500.00 1,350.00
Tukang Kayu L.02 OH 0.200 81,000.00 16,200.00
Kepala Tukang L.03 OH 0.020 85,500.00 1,710.00
Mandor L.04 OH 0.0010 90,000.00 90.00
JUMLAH TENAGA KERJA 19,350.00
B BAHAN
Fixed Top Pin Set 1.000 180,000.00 180,000.00
JUMLAH HARGA BAHAN 180,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 199,350.00
E Overhead & Profit 15% x D 29,902.50
F Harga Satuan Pekerjaan (D+E) 229,252.50

A. 4.6.2.31 Pasang Over Panel Pivot Patch Fitting 953,752.50

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.020 67,500.00 1,350.00
Tukang Kayu L.02 OH 0.200 81,000.00 16,200.00
Kepala Tukang L.03 OH 0.020 85,500.00 1,710.00
Mandor L.04 OH 0.0010 90,000.00 90.00
JUMLAH TENAGA KERJA 19,350.00
B BAHAN
Over panel pivot patch fitting Set 1.000 810,000.00 810,000.00
JUMLAH HARGA BAHAN 810,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 829,350.00
E Overhead & Profit 15% x D 124,402.50
F Harga Satuan Pekerjaan (D+E) 953,752.50

A. 4.6.2.32 Pasang Over Panel 1,367,752.50

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.020 67,500.00 1,350.00
Tukang Kayu L.02 OH 0.200 81,000.00 16,200.00
Kepala Tukang L.03 OH 0.020 85,500.00 1,710.00
Mandor L.04 OH 0.0010 90,000.00 90.00
JUMLAH TENAGA KERJA 19,350.00
B BAHAN
Over panel Set 1.000 1,170,000.00 1,170,000.00
JUMLAH HARGA BAHAN 1,170,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 1,189,350.00
E Overhead & Profit 15% x D 178,402.50
F Harga Satuan Pekerjaan (D+E) 1,367,752.50

A. 4.6.2.33 Pemasangan 1 m2 Kaca Rayband tebal 5 mm 130,539.38

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.015 67,500.00 1,012.50
Tukang Kayu L.02 OH 0.150 81,000.00 12,150.00
Kepala Tukang L.03 OH 0.015 85,500.00 1,282.50
Mandor L.04 OH 0.0008 90,000.00 67.50
JUMLAH TENAGA KERJA 14,512.50
B BAHAN
Kaca ryben 5 mm m2 1.100 90,000.00 99,000.00
JUMLAH HARGA BAHAN 99,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 113,512.50
E Overhead & Profit 15% x D 17,026.88
F Harga Satuan Pekerjaan (D+E) 130,539.38

A. 4.6.2.34 Pemasangan 1 m2 Kaca Tempered tb. 12 mm 758,939.63

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.017 67,500.00 1,147.50
Tukang Kayu L.02 OH 0.170 81,000.00 13,770.00
Kepala Tukang L.03 OH 0.017 85,500.00 1,453.50
Mandor L.04 OH 0.0009 90,000.00 76.50
JUMLAH TENAGA KERJA 16,447.50
B BAHAN
Kaca Tempered 12 mm m2 1.100 585,000.00 643,500.00
JUMLAH HARGA BAHAN 643,500.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 659,947.50
E Overhead & Profit 15% x D 98,992.13
F Harga Satuan Pekerjaan (D+E) 758,939.63

A. 4.6.2.35 Pemasangan 1 m2 Kaca Es / dop 187,464.38

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.015 67,500.00 1,012.50
Tukang Kayu L.02 OH 0.150 81,000.00 12,150.00
Kepala Tukang L.03 OH 0.015 85,500.00 1,282.50
Mandor L.04 OH 0.0008 90,000.00 67.50
JUMLAH TENAGA KERJA 14,512.50
B BAHAN
Kaca Es/Dop m2 1.100 135,000.00 148,500.00
JUMLAH HARGA BAHAN 148,500.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 163,012.50
E Overhead & Profit 15% x D 24,451.88
F Harga Satuan Pekerjaan (D+E) 187,464.38
A. 4.7.1.HARGA SATUAN PEKERJAAN PENGECATAN
A. 4.7.1.1 Pengikisan / pengerokan 1 m2 Permukaan Cat Tembok Lama 12,885.75

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.150 67,500.00 10,125.00
Mandor L.04 OH 0.003 90,000.00 270.00
JUMLAH TENAGA KERJA 10,395.00
B BAHAN
Soda Api Kg 0.050 16,200.00 810.00
JUMLAH HARGA BAHAN 810.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 11,205.00
E Overhead & Profit 15% x D 1,680.75
F Harga Satuan Pekerjaan (D+E) 12,885.75

A. 4.7.1.2 Pencucian 1 m2 Bidang Permukaan Tembok yang Pernah dicat 12,471.75

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.150 67,500.00 10,125.00
Mandor L.04 OH 0.003 90,000.00 270.00
JUMLAH TENAGA KERJA 10,395.00
B BAHAN
Sabun Kg 0.050 9,000.00 450.00
JUMLAH HARGA BAHAN 450.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 10,845.00
E Overhead & Profit 15% x D 1,626.75
F Harga Satuan Pekerjaan (D+E) 12,471.75

A. 4.7.1.3 Pengerokan 1 m2 Karat Cat Lama permukaan Baja dengan cara manual 12,989.25

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.150 67,500.00 10,125.00
Mandor L.04 OH 0.008 90,000.00 720.00
JUMLAH TENAGA KERJA 10,845.00
B BAHAN
Sabun Kg 0.050 9,000.00 450.00
JUMLAH HARGA BAHAN 450.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 11,295.00
E Overhead & Profit 15% x D 1,694.25
F Harga Satuan Pekerjaan (D+E) 12,989.25

A. 4.7.1.4 Pengecatan 1 m2 Bidang Kayu Baru (1 lapisp Plamur, 1 lapis Cat dasar, 2 Lapis Cat P 46,882.91

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.070 67,500.00 4,725.00
Tukang Cat L.02 OH 0.009 81,000.00 729.00
Kepala Tukang L.03 OH 0.006 85,500.00 513.00
Mandor L.04 OH 0.003 90,000.00 270.00
JUMLAH TENAGA KERJA 6,237.00
B BAHAN
Cat Menie kg 0.200 19,800.00 3,960.00
Plamuur kg 0.150 24,525.00 3,678.75
Cat Dasar kg 0.170 67,500.00 11,475.00
Cat Penutup kg 0.260 54,900.00 14,274.00
Kuas bh 0.010 6,300.00 63.00
Pengencer kg 0.030 18,000.00 540.00
Amplas lbr 0.200 2,700.00 540.00
JUMLAH HARGA BAHAN 34,530.75
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 40,767.75
E Overhead & Profit 15% x D 6,115.16
F Harga Satuan Pekerjaan (D+E) 46,882.91

A. 4.7.1.5 Pengecatan 1 m2 Bidang Kayu Baru (1 lapis Plamuur, 1 lapis Cat dasar, 3 Lapis Cat P 61,310.81

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.070 67,500.00 4,725.00
Tukang Cat L.02 OH 0.105 81,000.00 8,505.00
Kepala Tukang L.03 OH 0.004 85,500.00 342.00
Mandor L.04 OH 0.003 90,000.00 270.00
JUMLAH TENAGA KERJA 13,842.00
B BAHAN
Cat Menie kg 0.200 19,800.00 3,960.00
Plamuur kg 0.150 24,525.00 3,678.75
Cat Dasar kg 0.170 67,500.00 11,475.00
Cat Penutup kg 0.350 54,900.00 19,215.00
Kuas bh 0.010 6,300.00 63.00
Pengencer kg 0.030 18,000.00 540.00
Amplas lbr 0.200 2,700.00 540.00
JUMLAH HARGA BAHAN 39,471.75
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 53,313.75
E Overhead & Profit 15% x D 7,997.06
F Harga Satuan Pekerjaan (D+E) 61,310.81

A. 4.7.1.6 Pelaburan 1 m2 Bidang Kayu dengan Teak Oil 32,245.43

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.040 67,500.00 2,700.00
Tukang Cat L.02 OH 0.063 81,000.00 5,103.00
Kepala Tukang L.03 OH 0.063 85,500.00 5,386.50
Mandor L.04 OH 0.003 90,000.00 270.00
JUMLAH TENAGA KERJA 13,459.50
B BAHAN
Teak Oil Ltr 0.360 40,500.00 14,580.00
JUMLAH HARGA BAHAN 14,580.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 28,039.50
E Overhead & Profit 15% x D 4,205.93
F Harga Satuan Pekerjaan (D+E) 32,245.43

A. 4.7.1.7 Pelaburan 1 m2 Bidang Kayu dengan Politur 50,554.58

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.040 67,500.00 2,700.00
Tukang Cat L.02 OH 0.060 81,000.00 4,860.00
Kepala Tukang L.03 OH 0.016 85,500.00 1,368.00
Mandor L.04 OH 0.003 90,000.00 270.00
JUMLAH TENAGA KERJA 9,198.00
B BAHAN
Politur Ltr 0.150 56,250.00 8,437.50
Politur Jadi Ltr 0.372 56,250.00 20,925.00
Ampelas Lbr 2.000 2,700.00 5,400.00
JUMLAH HARGA BAHAN 34,762.50
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 43,960.50
E Overhead & Profit 15% x D 6,594.08
F Harga Satuan Pekerjaan (D+E) 50,554.58

A. 4.7.1.8 Pelaburan 1 m2 Bidang Kayu dengan Cat Residu dan Ter 14,541.75

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.100 67,500.00 6,750.00
Mandor L.04 OH 0.006 90,000.00 540.00
JUMLAH TENAGA KERJA 7,290.00
B BAHAN
Residu atau Ter Ltr 0.350 15,300.00 5,355.00
JUMLAH HARGA BAHAN 5,355.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 12,645.00
E Overhead & Profit 15% x D 1,896.75
F Harga Satuan Pekerjaan (D+E) 14,541.75

A. 4.7.1.9 Pelaburan 1 m2 Bidang Kayu dengan Vernis 37,992.26

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.160 67,500.00 10,800.00
Tukang Kayu L.02 OH 0.160 81,000.00 12,960.00
Kepala Tukang L.03 OH 0.016 85,500.00 1,368.00
Mandor L.04 OH 0.003 90,000.00 270.00
JUMLAH TENAGA KERJA 25,398.00
B BAHAN
Vernis Ltr 0.150 40,950.00 6,142.50
Dempul Ltr 0.050 24,525.00 1,226.25
Ampelas Lbr 0.100 2,700.00 270.00
JUMLAH HARGA BAHAN 7,638.75
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 33,036.75
E Overhead & Profit 15% x D 4,955.51
F Harga Satuan Pekerjaan (D+E) 37,992.26

A. 4.7.1.10 Pengecatan 1 m2 Tembok Baru (1 lapis Plamir, 1 lapis Cat Dasar, 2 Lapis Cat Penutup 24,621.10

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.020 67,500.00 1,350.00
Tukang Kayu L.02 OH 0.063 81,000.00 5,103.00
Kepala Tukang L.03 OH 0.006 85,500.00 538.65
Mandor L.04 OH 0.003 90,000.00 270.00
JUMLAH TENAGA KERJA 7,261.65
B BAHAN
Plamir Kg 0.100 22,500.00 2,250.00
Cat Dasar Kg 0.100 67,500.00 6,750.00
Cat Penutup 2 kali Kg 0.260 19,800.00 5,148.00
JUMLAH HARGA BAHAN 14,148.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 21,409.65
E Overhead & Profit 15% x D 3,211.45
F Harga Satuan Pekerjaan (D+E) 24,621.10

A. 4.7.1.10.a Pengecatan 1 m2 Tembok Baru (1 lapis Plamir, 1 lapis Cat Dasar, 2 Lapis Cat Penutup 48,301.90

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.020 67,500.00 1,350.00
Tukang Kayu L.02 OH 0.063 81,000.00 5,103.00
Kepala Tukang L.03 OH 0.006 85,500.00 538.65
Mandor L.04 OH 0.003 90,000.00 270.00
JUMLAH TENAGA KERJA 7,261.65
B BAHAN
Plamir Kg 0.100 22,500.00 2,250.00
Cat Dasar Kg 0.100 67,500.00 6,750.00
Cat Penutup 2 kali Kg 0.260 99,000.00 25,740.00
JUMLAH HARGA BAHAN 34,740.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 42,001.65
E Overhead & Profit 15% x D 6,300.25
F Harga Satuan Pekerjaan (D+E) 48,301.90

A. 4.7.1.11 Pengecatan 1 m2 Tembok Lama (1 lapis Plamir, 2 lapis Cat Penutup) Interior 20,222.87

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.028 67,500.00 1,890.00
Tukang Kayu L.02 OH 0.042 81,000.00 3,402.00
Kepala Tukang L.03 OH 0.004 85,500.00 359.10
Mandor L.04 OH 0.003 90,000.00 270.00
JUMLAH TENAGA KERJA 5,921.10
B BAHAN
Cat Dasar Kg 0.120 67,500.00 8,100.00
Cat Penutup 2 kali Kg 0.180 19,800.00 3,564.00
JUMLAH HARGA BAHAN 11,664.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 17,585.10
E Overhead & Profit 15% x D 2,637.77
F Harga Satuan Pekerjaan (D+E) 20,222.87

A. 4.7.1.11.a Pengecatan 1 m2 Tembok Lama (1 lapis Plamir, 2 lapis Cat Penutup) Exterior 36,617.27

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.028 67,500.00 1,890.00
Tukang Kayu L.02 OH 0.042 81,000.00 3,402.00
Kepala Tukang L.03 OH 0.004 85,500.00 359.10
Mandor L.04 OH 0.003 90,000.00 270.00
JUMLAH TENAGA KERJA 5,921.10
B BAHAN
Cat Dasar Kg 0.120 67,500.00 8,100.00
Cat Penutup 2 kali Kg 0.180 99,000.00 17,820.00
JUMLAH HARGA BAHAN 25,920.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 31,841.10
E Overhead & Profit 15% x D 4,776.17
F Harga Satuan Pekerjaan (D+E) 36,617.27

A. 4.7.1.12 Pelaburan 1 m2 Tembok dengan Kalkarium 7,275.02

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.028 67,500.00 1,890.00
Tukang Kayu L.02 OH 0.042 81,000.00 3,402.00
Kepala Tukang L.03 OH 0.004 85,500.00 359.10
Mandor L.04 OH 0.003 90,000.00 270.00
JUMLAH TENAGA KERJA 5,921.10
B BAHAN
Kalkarium Kg 0.100 4,050.00 405.00
JUMLAH HARGA BAHAN 405.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 6,326.10
E Overhead & Profit 15% x D 948.92
F Harga Satuan Pekerjaan (D+E) 7,275.02

A. 4.7.1.13 Pelaburan 1 m2 Tembok dengan Kapur Sirih 13,620.66

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.150 67,500.00 10,125.00
Tukang Kayu L.02 OH 0.001 81,000.00 81.00
Kepala Tukang L.03 OH 0.000 85,500.00 8.55
Mandor L.04 OH 0.003 90,000.00 225.00
JUMLAH TENAGA KERJA 10,439.55
B BAHAN
Kapur Sirih Kg 0.150 4,230.00 634.50
Amplas lbr 0.100 2,700.00 270.00
Alang-alang ikat 0.250 2,000.00 500.00
JUMLAH HARGA BAHAN 1,404.50
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 11,844.05
E Overhead & Profit 15% x D 1,776.61
F Harga Satuan Pekerjaan (D+E) 13,620.66

A. 4.7.1.14 Pelaburan 1 m2 Tembok lama dengan Kapur Sirih (pemeliharaan) 6,534.01

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.040 67,500.00 2,700.00
Tukang Kayu L.02 OH 0.005 81,000.00 405.00
Kepala Tukang L.03 OH 0.001 85,500.00 42.75
Mandor L.04 OH 0.003 90,000.00 225.00
JUMLAH TENAGA KERJA 3,372.75
B BAHAN
Kapur Sirih Kg 0.300 4,230.00 1,269.00
Amplas lbr 0.200 2,700.00 540.00
Alang-alang ikat 0.250 2,000.00 500.00
JUMLAH HARGA BAHAN 2,309.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 5,681.75
E Overhead & Profit 15% x D 852.26
F Harga Satuan Pekerjaan (D+E) 6,534.01

A. 4.7.1.15 Pemasangan 1 m2 Wallpaper 92,373.75

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.020 67,500.00 1,350.00
Tukang Kayu L.02 OH 0.200 81,000.00 16,200.00
Kepala Tukang L.03 OH 0.020 85,500.00 1,710.00
Mandor L.04 OH 0.003 90,000.00 225.00
JUMLAH TENAGA KERJA 19,485.00
B BAHAN
Wallpaper m2 1.200 45,000.00 54,000.00
Lem kg 0.200 34,200.00 6,840.00
JUMLAH HARGA BAHAN 60,840.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 80,325.00
E Overhead & Profit 15% x D 12,048.75
F Harga Satuan Pekerjaan (D+E) 92,373.75
A. 4.7.1.16 Pengecatan 1 m2 Permukaan Baja dengan Meni Besi 23,308.20

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.020 67,500.00 1,350.00
Tukang Kayu L.02 OH 0.200 81,000.00 16,200.00
Kepala Tukang L.03 OH 0.002 85,500.00 171.00
Mandor L.04 OH 0.003 90,000.00 225.00
JUMLAH TENAGA KERJA 17,946.00
B BAHAN
Meni Besi Kg 0.100 19,800.00 1,980.00
Perekat / Lem Kg 0.010 34,200.00 342.00
JUMLAH HARGA BAHAN 2,322.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 20,268.00
E Overhead & Profit 15% x D 3,040.20
F Harga Satuan Pekerjaan (D+E) 23,308.20

A. 4.7.1.16.a Pengecatan 1 m2 Permukaan Baja dengan Cat Besi 27,241.20

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.020 67,500.00 1,350.00
Tukang Kayu L.02 OH 0.200 81,000.00 16,200.00
Kepala Tukang L.03 OH 0.002 85,500.00 171.00
Mandor L.04 OH 0.003 90,000.00 225.00
JUMLAH TENAGA KERJA 17,946.00
B BAHAN
Cat Besi Kg 0.100 54,000.00 5,400.00
Perekat / Lem Kg 0.010 34,200.00 342.00
JUMLAH HARGA BAHAN 5,742.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 23,688.00
E Overhead & Profit 15% x D 3,553.20
F Harga Satuan Pekerjaan (D+E) 27,241.20

A. 4.7.1.17 Pengecatan 1 m2 Permukaan Baja dengan Meni Besi dengan Perancah 53,268.86

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.250 67,500.00 16,875.00
Tukang Kayu L.02 OH 0.225 81,000.00 18,225.00
Kepala Tukang L.03 OH 0.023 85,500.00 1,923.75
Mandor L.04 OH 0.008 90,000.00 675.00
JUMLAH TENAGA KERJA 37,698.75
B BAHAN
Meni Besi Kg 0.100 19,800.00 1,980.00
Perekat / Lem Kg 0.010 34,200.00 342.00
Perancah Kayu m3 0.002 3,150,000.00 6,300.00
JUMLAH HARGA BAHAN 8,622.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah A + B + C 46,320.75
E Overhead & Profit 15% x D 6,948.11
F Harga Satuan Pekerjaan (D+E) 53,268.86

A. 4.7.1.11 Waterproofing 1 m2 Permukaan 23,576.27

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.028 67,500.00 1,890.00
Tukang L.02 OH 0.042 81,000.00 3,402.00
Kepala Tukang L.03 OH 0.004 85,500.00 359.10
Mandor L.04 OH 0.003 90,000.00 270.00
JUMLAH TENAGA KERJA 5,921.10
B BAHAN
Cat waterproof 2 lapis Kg 0.180 81,000.00 14,580.00
JUMLAH HARGA BAHAN 14,580.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 20,501.10
E Overhead & Profit 15% x D 3,075.17
F Harga Satuan Pekerjaan (D+E) 23,576.27
BOW M. HARGA SATUAN PEKERJAAN LAIN-LAIN
BOW M. 1 Pemasangan 1 m2 Paving Hexagonal Kecil 6 cm isi 29 bh/m2 K.225 182,082.38

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.300 67,500.00 20,250.00
Tukang Batu L.02 OH 0.150 81,000.00 12,150.00
Kepala Tukang L.03 OH 0.015 85,500.00 1,282.50
Mandor L.04 OH 0.015 90,000.00 1,350.00
JUMLAH TENAGA KERJA 35,032.50
B BAHAN
Paving Hexagonal Kecil K. 225 m2 1.000 89,100.00 89,100.00
Pasir Pasang m3 0.100 342,000.00 34,200.00
JUMLAH HARGA BAHAN 123,300.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 158,332.50
E Overhead & Profit 15% x D 23,749.88
F Harga Satuan Pekerjaan (D+E) 182,082.38

dst
BOW M. 2 Upah meletakkan Kanstin/Kerb tiap 100 kg 51,698.25

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
Pekerja L.01 OH 0.500 67,500.00 33,750.00
Tukang Batu L.02 OH 0.100 81,000.00 8,100.00
Kepala Tukang L.03 OH 0.010 85,500.00 855.00
Mandor L.04 OH 0.025 90,000.00 2,250.00
JUMLAH TENAGA KERJA 44,955.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 44,955.00
E Overhead & Profit 15% x D 6,743.25
F Harga Satuan Pekerjaan (D+E) 51,698.25

BOW M. 3 1 m3 Perekat kanstin 1 PC:3PS 1,013,420.25

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA

JUMLAH TENAGA KERJA -


B BAHAN
Semen PC kg 450.000 1,137.50 511,875.00
Pasir Pasang m3 1.080 342,000.00 369,360.00
JUMLAH HARGA BAHAN 881,235.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 881,235.00
E Overhead & Profit 15% x D 132,185.25
F Harga Satuan Pekerjaan (D+E) 1,013,420.25
BOW M. 4 Prmasangan 1 m' Kansteen batako 10x20x50 cm 59,705.05

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA

JUMLAH TENAGA KERJA -


B BAHAN
Kansteen Batako bh 2.000 19,000.00 38,000.00
Perekat m3 0.002 1,013,420.25 2,026.84
Upah meletakkan 100 kg 0.230 51,698.25 11,890.60
JUMLAH HARGA BAHAN 51,917.44
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 51,917.44
E Overhead & Profit 15% x D 7,787.62
F Harga Satuan Pekerjaan (D+E) 59,705.05

BOW M. 5 Pemasangan 1 m' Kansteen Lubang K. 300 ukuran 15/20x30x50 cm 142,505.05

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA

JUMLAH TENAGA KERJA -


B BAHAN
Kansteen lubang 15/20x30x50 cm K.300 bh 2.000 55,000.00 110,000.00
Perekat m3 0.002 1,013,420.25 2,026.84
Upah meletakkan 100 kg 0.230 51,698.25 11,890.60
JUMLAH HARGA BAHAN 123,917.44
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 123,917.44
E Overhead & Profit 15% x D 18,587.62
F Harga Satuan Pekerjaan (D+E) 142,505.05

BOW M. 5.a Pemasangan 1 m' Kansteen Lubang K. 250 ukuran 15/20x30x50 cm 136,755.05

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA

JUMLAH TENAGA KERJA -


B BAHAN
Kansteen lubang 15/20x30x50 cm K.250 bh 2.000 52,500.00 105,000.00
Perekat m3 0.002 1,013,420.25 2,026.84
Upah meletakkan 100 kg 0.230 51,698.25 11,890.60
JUMLAH HARGA BAHAN 118,917.44
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 118,917.44
E Overhead & Profit 15% x D 17,837.62
F Harga Satuan Pekerjaan (D+E) 136,755.05

BOW M. 5.b Pemasangan 1 m' Kansteen Lubang K. 200 ukuran 15/20x30x50 cm 131,005.05
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA

JUMLAH TENAGA KERJA -


B BAHAN
Kansteen lubang 15/20x30x50 cm K.200 bh 2.000 50,000.00 100,000.00
Perekat m3 0.002 1,013,420.25 2,026.84
Upah meletakkan 100 kg 0.230 51,698.25 11,890.60
JUMLAH HARGA BAHAN 113,917.44
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 113,917.44
E Overhead & Profit 15% x D 17,087.62
F Harga Satuan Pekerjaan (D+E) 131,005.05

BOW M. 6 Pemasangan 1 m' Kansteen Standar K. 300 ukuran 15/20x30x50 cm 133,305.05

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA

JUMLAH TENAGA KERJA -


B BAHAN
Kansteen standar 15/20x30x50 cm K.300 bh 2.000 51,000.00 102,000.00
Perekat m3 0.002 1,013,420.25 2,026.84
Upah meletakkan 100 kg 0.230 51,698.25 11,890.60
JUMLAH HARGA BAHAN 115,917.44
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 115,917.44
E Overhead & Profit 15% x D 17,387.62
F Harga Satuan Pekerjaan (D+E) 133,305.05

BOW M. 6.a Pemasangan 1 m' Kansteen Standar K. 250 ukuran 15/20x30x50 cm 125,255.05

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA

JUMLAH TENAGA KERJA -


B BAHAN
Kansteen standar 15/20x30x50 cm K.250 bh 2.000 47,500.00 95,000.00
Perekat m3 0.002 1,013,420.25 2,026.84
Upah meletakkan 100 kg 0.230 51,698.25 11,890.60
JUMLAH HARGA BAHAN 108,917.44
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 108,917.44
E Overhead & Profit 15% x D 16,337.62
F Harga Satuan Pekerjaan (D+E) 125,255.05

BOW M. 6.b Pemasangan 1 m' Kansteen Standar K. 200 ukuran 15/20x30x50 cm 119,505.05

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

A TENAGA
JUMLAH TENAGA KERJA -
B BAHAN
Kansteen standar 15/20x30x50 cm K.200 bh 2.000 45,000.00 90,000.00
Perekat m3 0.002 1,013,420.25 2,026.84
Upah meletakkan 100 kg 0.230 51,698.25 11,890.60
JUMLAH HARGA BAHAN 103,917.44
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 103,917.44
E Overhead & Profit 15% x D 15,587.62
F Harga Satuan Pekerjaan (D+E) 119,505.05
A. 8.4.1. HARGA SATUAN PEKERJAAN PEMASANGAN PIPA

A. 8.4.1. 1 Pemasangan 1 m Pipa PVC Ø 63 mm 71,963.55

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.081 67,500.00 5,467.50
Tukang Pipa L.02 OH 0.041 81,000.00 3,280.50
Mandor L.04 OH 0.008 90,000.00 729.00
JUMLAH TENAGA KERJA 9,477.00
B BAHAN
Pipa PVC Ø 63 mm m 1.000 50,400.00 50,400.00

JUMLAH HARGA BAHAN 50,400.00


C PERALATAN
Sewa Tripot/Tackel & Handle crane 2T hari 0.006 450,000.00 2,700.00
JUMLAH HARGA ALAT 2,700.00

D Jumlah A + B + C 62,577.00
E Overhead & Profit 15% x D 9,386.55
F Harga Satuan Pekerjaan (D+E) 71,963.55

A. 8.4.1. 2 Pemasangan 1 m Pipa PVC Ø 90 mm 12,647.70

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.094 67,500.00 6,345.00
Tukang Pipa L.02 OH 0.047 81,000.00 3,807.00
Mandor L.04 OH 0.009 90,000.00 846.00
JUMLAH TENAGA KERJA 10,998.00
B BAHAN
Pipa PVC Ø 90 mm m 1.000 -

JUMLAH HARGA BAHAN -


C PERALATAN
Sewa Tripot/Tackel & Handle crane 2T hari 0.008 -
JUMLAH HARGA ALAT -

D Jumlah A + B + C 10,998.00
E Overhead & Profit 15% x D 1,649.70
F Harga Satuan Pekerjaan (D+E) 12,647.70

487241507.xlsx267/223 223 / 267 8.4.1 psg pipa


A. 8.4.1. 3 Pemasangan 1 m Pipa PVC Ø 110 mm 150,747.75

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.105 67,500.00 7,087.50
Tukang Pipa L.02 OH 0.053 81,000.00 4,252.50
Mandor L.04 OH 0.011 90,000.00 945.00
JUMLAH TENAGA KERJA 12,285.00
B BAHAN
Pipa PVC Ø 110 mm m 1.000 114,300.00 114,300.00
JUMLAH HARGA BAHAN 114,300.00
C PERALATAN
Sewa Tripot/Tackel & Handle crane 2T hari 0.010 450,000.00 4,500.00
JUMLAH HARGA ALAT 4,500.00

D Jumlah A + B + C 131,085.00
E Overhead & Profit 15% x D 19,662.75
F Harga Satuan Pekerjaan (D+E) 150,747.75

A. 8.4.1. 4 Pemasangan 1 m Pipa PVC Ø 150 mm 253,926.90

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.118 67,500.00 7,965.00
Tukang Pipa L.02 OH 0.059 81,000.00 4,779.00
Mandor L.04 OH 0.012 90,000.00 1,062.00
JUMLAH TENAGA KERJA 13,806.00
B BAHAN
Pipa PVC Ø 150 mm m 1.000 201,600.00 201,600.00
JUMLAH HARGA BAHAN 201,600.00
C PERALATAN
Sewa Tripot/Tackel & Handle crane 2T hari 0.012 450,000.00 5,400.00
JUMLAH HARGA ALAT 5,400.00

D Jumlah A + B + C 220,806.00
E Overhead & Profit 15% x D 33,120.90
F Harga Satuan Pekerjaan (D+E) 253,926.90

487241507.xlsx267/224 224 / 267 8.4.1 psg pipa


A. 8.4.1. 5 Pemasangan 1 m Pipa PVC Ø 200 mm 389,749.95

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.189 67,500.00 12,757.50
Tukang Pipa L.02 OH 0.095 81,000.00 7,654.50
Mandor L.04 OH 0.019 90,000.00 1,701.00
JUMLAH TENAGA KERJA 22,113.00
B BAHAN
Pipa PVC Ø 200 mm m 1.000 306,000.00 306,000.00
JUMLAH HARGA BAHAN 306,000.00
C PERALATAN
Sewa Tripot/Tackel & Handle crane 2T hari 0.024 450,000.00 10,800.00
JUMLAH HARGA ALAT 10,800.00

D Jumlah A + B + C 338,913.00
E Overhead & Profit 15% x D 50,836.95
F Harga Satuan Pekerjaan (D+E) 389,749.95

A. 8.4.1. 6 Pemasangan 1 m Pipa PVC Ø 250 mm 52,308.90

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.258 67,500.00 17,415.00
Tukang Pipa L.02 OH 0.129 81,000.00 10,449.00
Mandor L.04 OH 0.026 90,000.00 2,322.00
JUMLAH TENAGA KERJA 30,186.00
B BAHAN
Pipa PVC Ø 250 mm m 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & Handle crane 2T hari 0.034 450,000.00 15,300.00
JUMLAH HARGA ALAT 15,300.00

D Jumlah A + B + C 45,486.00
E Overhead & Profit 15% x D 6,822.90
F Harga Satuan Pekerjaan (D+E) 52,308.90

487241507.xlsx267/225 225 / 267 8.4.1 psg pipa


A. 8.4.1. 7 Pemasangan 1m Pipa PVC Ø 300 mm 60,257.70

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.294 67,500.00 19,845.00
Tukang Pipa L.02 OH 0.147 81,000.00 11,907.00
Mandor L.04 OH 0.029 90,000.00 2,646.00
JUMLAH TENAGA KERJA 34,398.00
B BAHAN
Pipa PVC Ø 300 mm m 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & Handle crane 2T hari 0.040 450,000.00 18,000.00
JUMLAH HARGA ALAT 18,000.00

D Jumlah A + B + C 52,398.00
E Overhead & Profit 15% x D 7,859.70
F Harga Satuan Pekerjaan (D+E) 60,257.70

A. 8.4.1. 17 Pemasangan 1 m Pipa HDPE Ø 63 mm 14,443.43

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.035 67,500.00 2,362.50
Tukang Pipa L.02 OH 0.017 81,000.00 1,377.00
Mandor L.04 OH 0.003 90,000.00 270.00
JUMLAH TENAGA KERJA 4,009.50
B BAHAN
Pipa HDPE Ø 63 mm m 1.000 -

JUMLAH HARGA BAHAN -


C PERALATAN
Sewa Tripot/Tackel & Handle crane 2T hari 0.019 450,000.00 8,550.00
JUMLAH HARGA ALAT 8,550.00

D Jumlah A + B + C 12,559.50
E Overhead & Profit 15% x D 1,883.93
F Harga Satuan Pekerjaan (D+E) 14,443.43

487241507.xlsx267/226 226 / 267 8.4.1 psg pipa


A. 8.4.1. 18 Pemasangan 1 m Pipa HDPE Ø 100 mm 51,957.00

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.040 67,500.00 2,700.00
Tukang Pipa L.02 OH 0.020 81,000.00 1,620.00
Mandor L.04 OH 0.004 90,000.00 360.00
JUMLAH TENAGA KERJA 4,680.00
B BAHAN
Pipa HDPE Ø 100 mm m 1.000 -

JUMLAH HARGA BAHAN -


C PERALATAN
Sewa Tripot/Tackel & Handle crane 2T hari 0.090 450,000.00 40,500.00
JUMLAH HARGA ALAT 40,500.00

D Jumlah A + B + C 45,180.00
E Overhead & Profit 15% x D 6,777.00
F Harga Satuan Pekerjaan (D+E) 51,957.00

A. 8.4.1. 19 Pemasangan 1 m Pipa HDPE Ø 125 mm 15,985.58

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.045 67,500.00 3,037.50
Tukang Pipa L.02 OH 0.023 81,000.00 1,863.00
Mandor L.04 OH 0.005 90,000.00 450.00
JUMLAH TENAGA KERJA 5,350.50
B BAHAN
Pipa HDPE Ø 125 mm m 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & Handle crane 2T hari 0.019 450,000.00 8,550.00
JUMLAH HARGA ALAT 8,550.00

D Jumlah A + B + C 13,900.50
E Overhead & Profit 15% x D 2,085.08
F Harga Satuan Pekerjaan (D+E) 15,985.58

487241507.xlsx267/227 227 / 267 8.4.1 psg pipa


A. 8.4.1. 20 Pemasangan 1 m Pipa HDPE Ø 150 mm 18,153.90

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.062 67,500.00 4,185.00
Tukang Pipa L.02 OH 0.031 81,000.00 2,511.00
Mandor L.04 OH 0.006 90,000.00 540.00
JUMLAH TENAGA KERJA 7,236.00
B BAHAN
Pipa HDPE Ø 150 mm m 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & Handle crane 2T hari 0.019 450,000.00 8,550.00
JUMLAH HARGA ALAT 8,550.00

D Jumlah A + B + C 15,786.00
E Overhead & Profit 15% x D 2,367.90
F Harga Satuan Pekerjaan (D+E) 18,153.90

A. 8.4.1. 21 Pemasangan 1 m Pipa HDPE Ø 200 mm 23,535.90

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.102 67,500.00 6,885.00
Tukang Pipa L.02 OH 0.051 81,000.00 4,131.00
Mandor L.04 OH 0.010 90,000.00 900.00
JUMLAH TENAGA KERJA 11,916.00
B BAHAN
Pipa HDPE Ø 200 mm m 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & Handle crane 2T hari 0.019 450,000.00 8,550.00
JUMLAH HARGA ALAT 8,550.00

D Jumlah A + B + C 20,466.00
E Overhead & Profit 15% x D 3,069.90
F Harga Satuan Pekerjaan (D+E) 23,535.90

487241507.xlsx267/228 228 / 267 8.4.1 psg pipa


A. 8.4.1. 22 Pemasangan 1 m Pipa HDPE Ø 250 mm 39,645.68

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.133 67,500.00 8,977.50
Tukang Pipa L.02 OH 0.067 81,000.00 5,427.00
Mandor L.04 OH 0.013 90,000.00 1,170.00
JUMLAH TENAGA KERJA 15,574.50
B BAHAN
Pipa HDPE Ø 250 mm m 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & Handle crane 2T hari 0.042 450,000.00 18,900.00
JUMLAH HARGA ALAT 18,900.00

D Jumlah A + B + C 34,474.50
E Overhead & Profit 15% x D 5,171.18
F Harga Satuan Pekerjaan (D+E) 39,645.68

A. 8.4.1. 23 Pemasangan 1m Pipa HDPE Ø 300 mm 56,511.00

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.170 67,500.00 11,475.00
Tukang Pipa L.02 OH 0.085 81,000.00 6,885.00
Mandor L.04 OH 0.017 90,000.00 1,530.00
JUMLAH TENAGA KERJA 19,890.00
B BAHAN
Pipa HDPE Ø 300 mm m 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & Handle crane 2T hari 0.065 450,000.00 29,250.00
JUMLAH HARGA ALAT 29,250.00

D Jumlah A + B + C 49,140.00
E Overhead & Profit 15% x D 7,371.00
F Harga Satuan Pekerjaan (D+E) 56,511.00

487241507.xlsx267/229 229 / 267 8.4.1 psg pipa


A. 8.4.1. 33 Pemasangan 1 m Pipa GIP Ø 63 mm 46,321.43

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.345 67,500.00 23,287.50
Tukang Pipa L.02 OH 0.172 81,000.00 13,932.00
Mandor L.04 OH 0.034 90,000.00 3,060.00
JUMLAH TENAGA KERJA 40,279.50
B BAHAN
Pipa GIP Ø 63 mm m 1.000 -

JUMLAH HARGA BAHAN -


C PERALATAN
Sewa Tripot/Tackel & Handle crane 2T hari - 450,000.00 -
JUMLAH HARGA ALAT -

D Jumlah A + B + C 40,279.50
E Overhead & Profit 15% x D 6,041.93
F Harga Satuan Pekerjaan (D+E) 46,321.43

A. 8.4.1. 34 Pemasangan 1 m Pipa GIP Ø 100 mm 53,820.00

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.400 67,500.00 27,000.00
Tukang Pipa L.02 OH 0.200 81,000.00 16,200.00
Mandor L.04 OH 0.040 90,000.00 3,600.00
JUMLAH TENAGA KERJA 46,800.00
B BAHAN
Pipa GIP Ø 100 mm m 1.000 -

JUMLAH HARGA BAHAN -


C PERALATAN
Sewa Tripot/Tackel & Handle crane 2T hari - 450,000.00 -
JUMLAH HARGA ALAT -

D Jumlah A + B + C 46,800.00
E Overhead & Profit 15% x D 7,020.00
F Harga Satuan Pekerjaan (D+E) 53,820.00

487241507.xlsx267/230 230 / 267 8.4.1 psg pipa


A. 8.4.1. 35 Pemasangan 1 m Pipa GIP Ø 125 mm 60,205.95

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.448 67,500.00 30,240.00
Tukang Pipa L.02 OH 0.223 81,000.00 18,063.00
Mandor L.04 OH 0.045 90,000.00 4,050.00
JUMLAH TENAGA KERJA 52,353.00
B BAHAN
Pipa GIP Ø 125 mm m 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & Handle crane 2T hari - 450,000.00 -
JUMLAH HARGA ALAT -

D Jumlah A + B + C 52,353.00
E Overhead & Profit 15% x D 7,852.95
F Harga Satuan Pekerjaan (D+E) 60,205.95

A. 8.4.1. 36 Pemasangan 1 m Pipa GIP Ø 150 mm 68,123.70

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.506 67,500.00 34,155.00
Tukang Pipa L.02 OH 0.253 81,000.00 20,493.00
Mandor L.04 OH 0.051 90,000.00 4,590.00
JUMLAH TENAGA KERJA 59,238.00
B BAHAN
Pipa GIP Ø 150 mm m 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & Handle crane 2T hari - 450,000.00 -
JUMLAH HARGA ALAT -

D Jumlah A + B + C 59,238.00
E Overhead & Profit 15% x D 8,885.70
F Harga Satuan Pekerjaan (D+E) 68,123.70

487241507.xlsx267/231 231 / 267 8.4.1 psg pipa


A. 8.4.1. 37 Pemasangan 1 m Pipa GIP Ø 200 mm 107,143.20

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.796 67,500.00 53,730.00
Tukang Pipa L.02 OH 0.398 81,000.00 32,238.00
Mandor L.04 OH 0.080 90,000.00 7,200.00
JUMLAH TENAGA KERJA 93,168.00
B BAHAN
Pipa GIP Ø 200 mm m 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & Handle crane 2T hari - 450,000.00 -
JUMLAH HARGA ALAT -

D Jumlah A + B + C 93,168.00
E Overhead & Profit 15% x D 13,975.20
F Harga Satuan Pekerjaan (D+E) 107,143.20

A. 8.4.1. 38 Pemasangan 1 m Pipa GIP Ø 250 mm 127,744.88

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.949 67,500.00 64,057.50
Tukang Pipa L.02 OH 0.475 81,000.00 38,475.00
Mandor L.04 OH 0.095 90,000.00 8,550.00
JUMLAH TENAGA KERJA 111,082.50
B BAHAN
Pipa GIP Ø 250 mm m 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & Handle crane 2T hari - 450,000.00 -
JUMLAH HARGA ALAT -

D Jumlah A + B + C 111,082.50
E Overhead & Profit 15% x D 16,662.38
F Harga Satuan Pekerjaan (D+E) 127,744.88

487241507.xlsx267/232 232 / 267 8.4.1 psg pipa


A. 8.4.1. 39 Pemasangan 1m Pipa GIP Ø 300 mm 128,919.60

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.958 67,500.00 64,665.00
Tukang Pipa L.02 OH 0.479 81,000.00 38,799.00
Mandor L.04 OH 0.096 90,000.00 8,640.00
JUMLAH TENAGA KERJA 112,104.00
B BAHAN
Pipa GIP Ø 300 mm m 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & Handle crane 2T hari - 450,000.00 -
JUMLAH HARGA ALAT -

D Jumlah A + B + C 112,104.00
E Overhead & Profit 15% x D 16,815.60
F Harga Satuan Pekerjaan (D+E) 128,919.60

A. 8.4.1. 49 Pemasangan 1m Pipa DCI Ø 100 mm 248,808.83

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.489 67,500.00 33,007.50
Tukang Pipa L.02 OH 0.098 81,000.00 7,938.00
Mandor L.04 OH 0.049 90,000.00 4,410.00
JUMLAH TENAGA KERJA 45,355.50
B BAHAN
Pipa DCI Ø 100 mm m 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & Handle crane 2T hari 0.380 450,000.00 171,000.00
JUMLAH HARGA ALAT 171,000.00

D Jumlah A + B + C 216,355.50
E Overhead & Profit 15% x D 32,453.33
F Harga Satuan Pekerjaan (D+E) 248,808.83

487241507.xlsx267/233 233 / 267 8.4.1 psg pipa


A. 8.4.1. 50 Pemasangan 1m Pipa DCI Ø 125 mm 254,956.73

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.547 67,500.00 36,922.50
Tukang Pipa L.02 OH 0.109 81,000.00 8,829.00
Mandor L.04 OH 0.055 90,000.00 4,950.00
JUMLAH TENAGA KERJA 50,701.50
B BAHAN
Pipa DCI Ø 125 mm m 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & Handle crane 2T hari 0.380 450,000.00 171,000.00
JUMLAH HARGA ALAT 171,000.00

D Jumlah A + B + C 221,701.50
E Overhead & Profit 15% x D 33,255.23
F Harga Satuan Pekerjaan (D+E) 254,956.73

A. 8.4.1. 51 Pemasangan 1m Pipa DCI Ø 150 mm 262,005.08

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.613 67,500.00 41,377.50
Tukang Pipa L.02 OH 0.123 81,000.00 9,963.00
Mandor L.04 OH 0.061 90,000.00 5,490.00
JUMLAH TENAGA KERJA 56,830.50
B BAHAN
Pipa DCI Ø 150 mm m 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & Handle crane 2T hari 0.380 450,000.00 171,000.00
JUMLAH HARGA ALAT 171,000.00

D Jumlah A + B + C 227,830.50
E Overhead & Profit 15% x D 34,174.58
F Harga Satuan Pekerjaan (D+E) 262,005.08

487241507.xlsx267/234 234 / 267 8.4.1 psg pipa


A. 8.4.1. 52 Pemasangan 1m Pipa DCI Ø 200 mm 287,745.53

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.855 67,500.00 57,712.50
Tukang Pipa L.02 OH 0.171 81,000.00 13,851.00
Mandor L.04 OH 0.085 90,000.00 7,650.00
JUMLAH TENAGA KERJA 79,213.50
B BAHAN
Pipa DCI Ø 200 mm m 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & Handle crane 2T hari 0.380 450,000.00 171,000.00
JUMLAH HARGA ALAT 171,000.00

D Jumlah A + B + C 250,213.50
E Overhead & Profit 15% x D 37,532.03
F Harga Satuan Pekerjaan (D+E) 287,745.53

A. 8.4.1. 53 Pemasangan 1m Pipa DCI Ø 250 mm 127,227.38

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.951 67,500.00 64,192.50
Tukang Pipa L.02 OH 0.190 81,000.00 15,390.00
Mandor L.04 OH 0.095 90,000.00 8,550.00
JUMLAH TENAGA KERJA 88,132.50
B BAHAN
Pipa DCI Ø 250 mm m 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & Handle crane 2T hari 0.050 450,000.00 22,500.00
JUMLAH HARGA ALAT 22,500.00

D Jumlah A + B + C 110,632.50
E Overhead & Profit 15% x D 16,594.88
F Harga Satuan Pekerjaan (D+E) 127,227.38

487241507.xlsx267/235 235 / 267 8.4.1 psg pipa


A. 8.4.1. 54 Pemasangan 1m Pipa DCI Ø 300 mm 140,475.38

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.973 67,500.00 65,677.50
Tukang Pipa L.02 OH 0.195 81,000.00 15,795.00
Mandor L.04 OH 0.097 90,000.00 8,730.00
JUMLAH TENAGA KERJA 90,202.50
B BAHAN
Pipa DCI Ø 300 mm m 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & Handle crane 2T hari 0.071 450,000.00 31,950.00
JUMLAH HARGA ALAT 31,950.00

D Jumlah A + B + C 122,152.50
E Overhead & Profit 15% x D 18,322.88
F Harga Satuan Pekerjaan (D+E) 140,475.38

A. 8.4.1. 64 Pemasangan 1 m Pipa baja Ø 63 mm 55,265.90

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.499 67,500.00 33,682.50
Tukang Pipa L.02 OH 0.100 81,000.00 8,083.80
Mandor L.04 OH 0.050 90,000.00 4,491.00
JUMLAH TENAGA KERJA 46,257.30
B BAHAN
Pipa baja Ø 63 mm m 1.000 -

JUMLAH HARGA BAHAN -


C PERALATAN
Sewa Tripot/Tackel & Handle crane 2T hari 0.004 450,000.00 1,800.00
JUMLAH HARGA ALAT 1,800.00

D Jumlah A + B + C 48,057.30
E Overhead & Profit 15% x D 7,208.60
F Harga Satuan Pekerjaan (D+E) 55,265.90

487241507.xlsx267/236 236 / 267 8.4.1 psg pipa


A. 8.4.1. 65 Pemasangan 1 m Pipa baja Ø 100 mm 63,794.30

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.579 67,500.00 39,082.50
Tukang Pipa L.02 OH 0.116 81,000.00 9,379.80
Mandor L.04 OH 0.058 90,000.00 5,211.00
JUMLAH TENAGA KERJA 53,673.30
B BAHAN
Pipa baja Ø 100 mm m 1.000 -

JUMLAH HARGA BAHAN -


C PERALATAN
Sewa Tripot/Tackel & Handle crane 2T hari 0.004 450,000.00 1,800.00
JUMLAH HARGA ALAT 1,800.00

D Jumlah A + B + C 55,473.30
E Overhead & Profit 15% x D 8,321.00
F Harga Satuan Pekerjaan (D+E) 63,794.30

A. 8.4.1. 66 Pemasangan 1 m Pipa baja Ø 125 mm 71,150.04

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.648 67,500.00 43,740.00
Tukang Pipa L.02 OH 0.130 81,000.00 10,497.60
Mandor L.04 OH 0.065 90,000.00 5,832.00
JUMLAH TENAGA KERJA 60,069.60
B BAHAN
Pipa baja Ø 125 mm m 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & Handle crane 2T hari 0.004 450,000.00 1,800.00
JUMLAH HARGA ALAT 1,800.00

D Jumlah A + B + C 61,869.60
E Overhead & Profit 15% x D 9,280.44
F Harga Satuan Pekerjaan (D+E) 71,150.04

487241507.xlsx267/237 237 / 267 8.4.1 psg pipa


A. 8.4.1. 67 Pemasangan 1 m Pipa baja Ø 150 mm 77,546.34

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.708 67,500.00 47,790.00
Tukang Pipa L.02 OH 0.142 81,000.00 11,469.60
Mandor L.04 OH 0.071 90,000.00 6,372.00
JUMLAH TENAGA KERJA 65,631.60
B BAHAN
Pipa baja Ø 150 mm m 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & Handle crane 2T hari 0.004 450,000.00 1,800.00
JUMLAH HARGA ALAT 1,800.00

D Jumlah A + B + C 67,431.60
E Overhead & Profit 15% x D 10,114.74
F Harga Satuan Pekerjaan (D+E) 77,546.34

A. 8.4.1. 68 Pemasangan 1 m Pipa baja Ø 200 mm 120,721.37

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.113 67,500.00 75,127.50
Tukang Pipa L.02 OH 0.223 81,000.00 18,030.60
Mandor L.04 OH 0.111 90,000.00 10,017.00
JUMLAH TENAGA KERJA 103,175.10
B BAHAN
Pipa baja Ø 200 mm m 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & Handle crane 2T hari 0.004 450,000.00 1,800.00
JUMLAH HARGA ALAT 1,800.00

D Jumlah A + B + C 104,975.10
E Overhead & Profit 15% x D 15,746.27
F Harga Satuan Pekerjaan (D+E) 120,721.37

487241507.xlsx267/238 238 / 267 8.4.1 psg pipa


A. 8.4.1. 69 Pemasangan 1 m Pipa baja Ø 250 mm 143,321.63

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.325 67,500.00 89,437.50
Tukang Pipa L.02 OH 0.265 81,000.00 21,465.00
Mandor L.04 OH 0.133 90,000.00 11,925.00
JUMLAH TENAGA KERJA 122,827.50
B BAHAN
Pipa baja Ø 250 mm m 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & Handle crane 2T hari 0.004 450,000.00 1,800.00
JUMLAH HARGA ALAT 1,800.00

D Jumlah A + B + C 124,627.50
E Overhead & Profit 15% x D 18,694.13
F Harga Satuan Pekerjaan (D+E) 143,321.63

A. 8.4.1. 70 Pemasangan 1m Pipa baja Ø 300 mm 152,916.08

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.415 67,500.00 95,512.50
Tukang Pipa L.02 OH 0.283 81,000.00 22,923.00
Mandor L.04 OH 0.142 90,000.00 12,735.00
JUMLAH TENAGA KERJA 131,170.50
B BAHAN
Pipa baja Ø 300 mm m 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & Handle crane 2T hari 0.004 450,000.00 1,800.00
JUMLAH HARGA ALAT 1,800.00

D Jumlah A + B + C 132,970.50
E Overhead & Profit 15% x D 19,945.58
F Harga Satuan Pekerjaan (D+E) 152,916.08

487241507.xlsx267/239 239 / 267 8.4.1 psg pipa


A. 8.4.2. HARGA SATUAN PEKERJAAN PEMOTONGAN PIPA

A. 8.4.2. 1 Pemotongan 1 buah Pipa PVC Ø 63 mm 626.18

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.005 67,500.00 337.50
Tukang Pipa L.02 OH 0.002 81,000.00 162.00
Mandor L.04 OH 0.0005 90,000.00 45.00
JUMLAH TENAGA KERJA 544.50
B BAHAN
Pipa PVC Ø 63 mm buah 1.000 -

JUMLAH HARGA BAHAN -


C PERALATAN
Peralatan potong pipa T1/manual (gergaji) hari 0.003 -
JUMLAH HARGA ALAT -

D Jumlah A + B + C 544.50
E Overhead & Profit 15% x D 81.68
F Harga Satuan Pekerjaan (D+E) 626.18

A. 8.4.2. 2 Pemotongan 1 buah Pipa PVC Ø 90 mm 1,842.30

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.014 67,500.00 945.00
Tukang Pipa L.02 OH 0.007 81,000.00 567.00
Mandor L.04 OH 0.001 90,000.00 90.00
JUMLAH TENAGA KERJA 1,602.00
B BAHAN
Pipa PVC Ø 90 mm buah 1.000 -

JUMLAH HARGA BAHAN -


C PERALATAN
Peralatan potong pipa T1/manual (gergaji) hari 0.003 -
JUMLAH HARGA ALAT -

D Jumlah A + B + C 1,602.00
E Overhead & Profit 15% x D 240.30
F Harga Satuan Pekerjaan (D+E) 1,842.30

487241507.xlsx267/240 240 / 267 8.4.2 potong pipa


A. 8.4.2. 3 Pemotongan 1 buah Pipa PVC Ø 110 mm 2,939.40

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.022 67,500.00 1,485.00
Tukang Pipa L.02 OH 0.011 81,000.00 891.00
Mandor L.04 OH 0.002 90,000.00 180.00
JUMLAH TENAGA KERJA 2,556.00
B BAHAN
Pipa PVC Ø 110 mm buah 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T1/manual (gergaji) hari 0.003 0 -
JUMLAH HARGA ALAT -

D Jumlah A + B + C 2,556.00
E Overhead & Profit 15% x D 383.40
F Harga Satuan Pekerjaan (D+E) 2,939.40

A. 8.4.2. 4 Pemotongan 1 buah Pipa PVC Ø 150 mm 4,114.13

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.031 67,500.00 2,092.50
Tukang Pipa L.02 OH 0.015 81,000.00 1,215.00
Mandor L.04 OH 0.003 90,000.00 270.00
JUMLAH TENAGA KERJA 3,577.50
B BAHAN
Pipa PVC Ø 150 mm buah 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T1/manual (gergaji) hari 0.003 0 -
JUMLAH HARGA ALAT -

D Jumlah A + B + C 3,577.50
E Overhead & Profit 15% x D 536.63
F Harga Satuan Pekerjaan (D+E) 4,114.13

487241507.xlsx267/241 241 / 267 8.4.2 potong pipa


A. 8.4.2. 5 Pemotongan 1 buah Pipa PVC Ø 200 mm 10,841.63

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.081 67,500.00 5,467.50
Tukang Pipa L.02 OH 0.040 81,000.00 3,240.00
Mandor L.04 OH 0.008 90,000.00 720.00
JUMLAH TENAGA KERJA 9,427.50
B BAHAN
Pipa PVC Ø 200 mm buah 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T1/manual (gergaji) hari 0.017 0 -
JUMLAH HARGA ALAT -

D Jumlah A + B + C 9,427.50
E Overhead & Profit 15% x D 1,414.13
F Harga Satuan Pekerjaan (D+E) 10,841.63

A. 8.4.2. 6 Pemotongan 1 buah Pipa PVC Ø 250 mm 17,243.10

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.128 67,500.00 8,640.00
Tukang Pipa L.02 OH 0.064 81,000.00 5,184.00
Mandor L.04 OH 0.013 90,000.00 1,170.00
JUMLAH TENAGA KERJA 14,994.00
B BAHAN
Pipa PVC Ø 250 mm buah 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T1/manual (gergaji) hari 0.030 0 -
JUMLAH HARGA ALAT -

D Jumlah A + B + C 14,994.00
E Overhead & Profit 15% x D 2,249.10
F Harga Satuan Pekerjaan (D+E) 17,243.10

487241507.xlsx267/242 242 / 267 8.4.2 potong pipa


A. 8.4.2. 7 Pemotongan 1 buah Pipa PVC Ø 300 mm 20,756.93

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.155 67,500.00 10,462.50
Tukang Pipa L.02 OH 0.077 81,000.00 6,237.00
Mandor L.04 OH 0.015 90,000.00 1,350.00
JUMLAH TENAGA KERJA 18,049.50
B BAHAN
Pipa PVC Ø 300 mm buah 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T1/manual (gergaji) hari 0.037 0 -
JUMLAH HARGA ALAT -

D Jumlah A + B + C 18,049.50
E Overhead & Profit 15% x D 2,707.43
F Harga Satuan Pekerjaan (D+E) 20,756.93

A. 8.4.2. 17 Pemotongan 1 buah Pipa HDPE Ø 63 mm 3,436.20

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.002 67,500.00 135.00
Tukang Pipa L.02 OH 0.001 81,000.00 81.00
Mandor L.04 OH 0.0002 90,000.00 18.00
Operator L.08 OH 0.034 81,000.00 2,754.00
JUMLAH TENAGA KERJA 2,988.00
B BAHAN
Pipa HDPE Ø 63 mm buah 1.000 -

JUMLAH HARGA BAHAN -


C PERALATAN
Peralatan potong pipa T2/mekanik (cilinder shaw) hari 0.004 0 -
JUMLAH HARGA ALAT -

D Jumlah A + B + C 2,988.00
E Overhead & Profit 15% x D 448.20
F Harga Satuan Pekerjaan (D+E) 3,436.20

487241507.xlsx267/243 243 / 267 8.4.2 potong pipa


A. 8.4.2. 18 Pemotongan 1 buah Pipa HDPE Ø 100 mm 7,462.35

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.006 67,500.00 405.00
Tukang Pipa L.02 OH 0.003 81,000.00 243.00
Mandor L.04 OH 0.001 90,000.00 90.00
Operator L.08 OH 0.071 81,000.00 5,751.00
JUMLAH TENAGA KERJA 6,489.00
B BAHAN
Pipa HDPE Ø 100 mm buah 1.000 -

JUMLAH HARGA BAHAN -


C PERALATAN
Peralatan potong pipa T2/mekanik (cilinder shaw) hari 0.005 0 -
JUMLAH HARGA ALAT -

D Jumlah A + B + C 6,489.00
E Overhead & Profit 15% x D 973.35
F Harga Satuan Pekerjaan (D+E) 7,462.35

A. 8.4.2. 19 Pemotongan 1 buah Pipa HDPE Ø 125 mm 10,210.28

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.009 67,500.00 607.50
Tukang Pipa L.02 OH 0.005 81,000.00 405.00
Mandor L.04 OH 0.001 90,000.00 90.00
Operator L.08 OH 0.096 81,000.00 7,776.00
JUMLAH TENAGA KERJA 8,878.50
B BAHAN
Pipa HDPE Ø 125 mm buah 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik (cilinder shaw) hari 0.006 0 -
JUMLAH HARGA ALAT -

D Jumlah A + B + C 8,878.50
E Overhead & Profit 15% x D 1,331.78
F Harga Satuan Pekerjaan (D+E) 10,210.28

487241507.xlsx267/244 244 / 267 8.4.2 potong pipa


A. 8.4.2. 20 Pemotongan 1 buah Pipa HDPE Ø 150 mm 13,465.35

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.016 67,500.00 1,080.00
Tukang Pipa L.02 OH 0.008 81,000.00 648.00
Mandor L.04 OH 0.002 90,000.00 180.00
Operator L.08 OH 0.121 81,000.00 9,801.00
JUMLAH TENAGA KERJA 11,709.00
B BAHAN
Pipa HDPE Ø 150 mm buah 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik (cilinder shaw) hari 0.009 0 -
JUMLAH HARGA ALAT -

D Jumlah A + B + C 11,709.00
E Overhead & Profit 15% x D 1,756.35
F Harga Satuan Pekerjaan (D+E) 13,465.35

A. 8.4.2. 21 Pemotongan 1 buah Pipa HDPE Ø 200 mm 21,807.45

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.044 67,500.00 2,970.00
Tukang Pipa L.02 OH 0.022 81,000.00 1,782.00
Mandor L.04 OH 0.004 90,000.00 360.00
Operator L.08 OH 0.171 81,000.00 13,851.00
JUMLAH TENAGA KERJA 18,963.00
B BAHAN
Pipa HDPE Ø 200 mm buah 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik (cilinder shaw) hari 0.017 0 -
JUMLAH HARGA ALAT -

D Jumlah A + B + C 18,963.00
E Overhead & Profit 15% x D 2,844.45
F Harga Satuan Pekerjaan (D+E) 21,807.45

487241507.xlsx267/245 245 / 267 8.4.2 potong pipa


A. 8.4.2. 22 Pemotongan 1 buah Pipa HDPE Ø 250 mm 29,585.48

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.067 67,500.00 4,522.50
Tukang Pipa L.02 OH 0.033 81,000.00 2,673.00
Mandor L.04 OH 0.007 90,000.00 630.00
Operator L.08 OH 0.221 81,000.00 17,901.00
JUMLAH TENAGA KERJA 25,726.50
B BAHAN
Pipa HDPE Ø 250 mm buah 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik (cilinder shaw) hari 0.023 0 -
JUMLAH HARGA ALAT -

D Jumlah A + B + C 25,726.50
E Overhead & Profit 15% x D 3,858.98
F Harga Satuan Pekerjaan (D+E) 29,585.48

A. 8.4.2. 23 Pemotongan 1 buah Pipa HDPE Ø 300 mm 37,353.15

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.090 67,500.00 6,075.00
Tukang Pipa L.02 OH 0.045 81,000.00 3,645.00
Mandor L.04 OH 0.009 90,000.00 810.00
Operator L.08 OH 0.271 81,000.00 21,951.00
JUMLAH TENAGA KERJA 32,481.00
B BAHAN
Pipa HDPE Ø 300 mm buah 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik (cilinder shaw) hari 0.030 0 -
JUMLAH HARGA ALAT -

D Jumlah A + B + C 32,481.00
E Overhead & Profit 15% x D 4,872.15
F Harga Satuan Pekerjaan (D+E) 37,353.15

487241507.xlsx267/246 246 / 267 8.4.2 potong pipa


A. 8.4.2. 33 Pemotongan 1 buah Pipa GIP Ø 63 mm 2,613.38

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.019 67,500.00 1,282.50
Tukang Pipa L.02 OH 0.010 81,000.00 810.00
Mandor L.04 OH 0.002 90,000.00 180.00
Operator L.08 OH - 81,000.00 -
JUMLAH TENAGA KERJA 2,272.50
B BAHAN
Pipa GIP Ø 63 mm buah 1.000 -

JUMLAH HARGA BAHAN -


C PERALATAN
Peralatan potong pipa T2/mekanik (cilinder shaw) hari - 0 -
JUMLAH HARGA ALAT -

D Jumlah A + B + C 2,272.50
E Overhead & Profit 15% x D 340.88
F Harga Satuan Pekerjaan (D+E) 2,613.38

A. 8.4.2. 34 Pemotongan 1 buah Pipa GIP Ø 100 mm 7,928.10

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.058 67,500.00 3,915.00
Tukang Pipa L.02 OH 0.029 81,000.00 2,349.00
Mandor L.04 OH 0.007 90,000.00 630.00
Operator L.08 OH - 81,000.00 -
JUMLAH TENAGA KERJA 6,894.00
B BAHAN
Pipa GIP Ø 100 mm buah 1.000 -

JUMLAH HARGA BAHAN -


C PERALATAN
Peralatan potong pipa T2/mekanik (cilinder shaw) hari - 0 -
JUMLAH HARGA ALAT -

D Jumlah A + B + C 6,894.00
E Overhead & Profit 15% x D 1,034.10
F Harga Satuan Pekerjaan (D+E) 7,928.10

487241507.xlsx267/247 247 / 267 8.4.2 potong pipa


A. 8.4.2. 35 Pemotongan 1 buah Pipa GIP Ø 125 mm 12,357.90

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.092 67,500.00 6,210.00
Tukang Pipa L.02 OH 0.046 81,000.00 3,726.00
Mandor L.04 OH 0.009 90,000.00 810.00
Operator L.08 OH - 81,000.00 -
JUMLAH TENAGA KERJA 10,746.00
B BAHAN
Pipa GIP Ø 125 mm buah 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik (cilinder shaw) hari - 0 -
JUMLAH HARGA ALAT -

D Jumlah A + B + C 10,746.00
E Overhead & Profit 15% x D 1,611.90
F Harga Satuan Pekerjaan (D+E) 12,357.90

A. 8.4.2. 36 Pemotongan 1 buah Pipa GIP Ø 150 mm 17,662.28

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.131 67,500.00 8,842.50
Tukang Pipa L.02 OH 0.066 81,000.00 5,346.00
Mandor L.04 OH 0.013 90,000.00 1,170.00
Operator L.08 OH - 81,000.00 -
JUMLAH TENAGA KERJA 15,358.50
B BAHAN
Pipa GIP Ø 150 mm buah 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik (cilinder shaw) hari - 0 -
JUMLAH HARGA ALAT -

D Jumlah A + B + C 15,358.50
E Overhead & Profit 15% x D 2,303.78
F Harga Satuan Pekerjaan (D+E) 17,662.28

487241507.xlsx267/248 248 / 267 8.4.2 potong pipa


A. 8.4.2. 37 Pemotongan 1 buah Pipa GIP Ø 200 mm 45,747.00

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.340 67,500.00 22,950.00
Tukang Pipa L.02 OH 0.170 81,000.00 13,770.00
Mandor L.04 OH 0.034 90,000.00 3,060.00
Operator L.08 OH - 81,000.00 -
JUMLAH TENAGA KERJA 39,780.00
B BAHAN
Pipa GIP Ø 200 mm buah 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik (cilinder shaw) hari - 0 -
JUMLAH HARGA ALAT -

D Jumlah A + B + C 39,780.00
E Overhead & Profit 15% x D 5,967.00
F Harga Satuan Pekerjaan (D+E) 45,747.00

A. 8.4.2. 38 Pemotongan 1 buah Pipa GIP Ø 250 mm 63,812.93

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.475 67,500.00 32,062.50
Tukang Pipa L.02 OH 0.237 81,000.00 19,197.00
Mandor L.04 OH 0.047 90,000.00 4,230.00
Operator L.08 OH - 81,000.00 -
JUMLAH TENAGA KERJA 55,489.50
B BAHAN
Pipa GIP Ø 250 mm buah 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik (cilinder shaw) hari - 0 -
JUMLAH HARGA ALAT -

D Jumlah A + B + C 55,489.50
E Overhead & Profit 15% x D 8,323.43
F Harga Satuan Pekerjaan (D+E) 63,812.93

487241507.xlsx267/249 249 / 267 8.4.2 potong pipa


A. 8.4.2. 39 Pemotongan 1 buah Pipa GIP Ø 300 mm 67,771.80

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.504 67,500.00 34,020.00
Tukang Pipa L.02 OH 0.252 81,000.00 20,412.00
Mandor L.04 OH 0.050 90,000.00 4,500.00
Operator L.08 OH - 81,000.00 -
JUMLAH TENAGA KERJA 58,932.00
B BAHAN
Pipa GIP Ø 300 mm buah 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik (cilinder shaw) hari - 0 -
JUMLAH HARGA ALAT -

D Jumlah A + B + C 58,932.00
E Overhead & Profit 15% x D 8,839.80
F Harga Satuan Pekerjaan (D+E) 67,771.80

A. 8.4.2. 49 Pemotongan 1 buah Pipa DCI Ø 100 mm 7,568.96

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.071 67,500.00 4,792.50
Tukang Pipa L.02 OH 0.014 81,000.00 1,150.20
Mandor L.04 OH 0.007 90,000.00 639.00
JUMLAH TENAGA KERJA 6,581.70
B BAHAN
Pipa DCI Ø 100 mm buah 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik (cilinder shaw) hari 0.003 0 -
JUMLAH HARGA ALAT -

D Jumlah A + B + C 6,581.70
E Overhead & Profit 15% x D 987.26
F Harga Satuan Pekerjaan (D+E) 7,568.96

487241507.xlsx267/250 250 / 267 8.4.2 potong pipa


A. 8.4.2. 50 Pemotongan 1 buah Pipa DCI Ø 125 mm 11,939.76

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.112 67,500.00 7,560.00
Tukang Pipa L.02 OH 0.022 81,000.00 1,814.40
Mandor L.04 OH 0.011 90,000.00 1,008.00
JUMLAH TENAGA KERJA 10,382.40
B BAHAN
Pipa DCI Ø 125 mm buah 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik (cilinder shaw) hari 0.010 0 -
JUMLAH HARGA ALAT -

D Jumlah A + B + C 10,382.40
E Overhead & Profit 15% x D 1,557.36
F Harga Satuan Pekerjaan (D+E) 11,939.76

A. 8.4.2. 51 Pemotongan 1 buah Pipa DCI Ø 150 mm 16,950.20

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.159 67,500.00 10,732.50
Tukang Pipa L.02 OH 0.032 81,000.00 2,575.80
Mandor L.04 OH 0.016 90,000.00 1,431.00
JUMLAH TENAGA KERJA 14,739.30
B BAHAN
Pipa DCI Ø 150 mm buah 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik (cilinder shaw) hari 0.018 0 -
JUMLAH HARGA ALAT -

D Jumlah A + B + C 14,739.30
E Overhead & Profit 15% x D 2,210.90
F Harga Satuan Pekerjaan (D+E) 16,950.20

487241507.xlsx267/251 251 / 267 8.4.2 potong pipa


A. 8.4.2. 52 Pemotongan 1 buah Pipa DCI Ø 200 mm 39,017.43

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.366 67,500.00 24,705.00
Tukang Pipa L.02 OH 0.073 81,000.00 5,929.20
Mandor L.04 OH 0.037 90,000.00 3,294.00
JUMLAH TENAGA KERJA 33,928.20
B BAHAN
Pipa DCI Ø 200 mm buah 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik (cilinder shaw) hari 0.054 0 -
JUMLAH HARGA ALAT -

D Jumlah A + B + C 33,928.20
E Overhead & Profit 15% x D 5,089.23
F Harga Satuan Pekerjaan (D+E) 39,017.43

A. 8.4.2. 53 Pemotongan 1 buah Pipa DCI Ø 250 mm 50,743.98

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.476 67,500.00 32,130.00
Tukang Pipa L.02 OH 0.095 81,000.00 7,711.20
Mandor L.04 OH 0.048 90,000.00 4,284.00
JUMLAH TENAGA KERJA 44,125.20
B BAHAN
Pipa DCI Ø 250 mm buah 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik (cilinder shaw) hari 0.073 0 -
JUMLAH HARGA ALAT -

D Jumlah A + B + C 44,125.20
E Overhead & Profit 15% x D 6,618.78
F Harga Satuan Pekerjaan (D+E) 50,743.98

487241507.xlsx267/252 252 / 267 8.4.2 potong pipa


A. 8.4.2. 54 Pemotongan 1 buah Pipa DCI Ø 300 mm 54,581.76

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.512 67,500.00 34,560.00
Tukang Pipa L.02 OH 0.102 81,000.00 8,294.40
Mandor L.04 OH 0.051 90,000.00 4,608.00
JUMLAH TENAGA KERJA 47,462.40
B BAHAN
Pipa DCI Ø 300 mm buah 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik (cilinder shaw) hari 0.079 0 -
JUMLAH HARGA ALAT -

D Jumlah A + B + C 47,462.40
E Overhead & Profit 15% x D 7,119.36
F Harga Satuan Pekerjaan (D+E) 54,581.76

A. 8.4.2. 64 Pemotongan 1 buahPipa baja Ø 63 mm 3,042.90

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.028 67,500.00 1,890.00
Tukang Pipa L.02 OH 0.006 81,000.00 486.00
Mandor L.04 OH 0.003 90,000.00 270.00
JUMLAH TENAGA KERJA 2,646.00
B BAHAN
Pipa baja Ø 63 mm buah 1.000 -

JUMLAH HARGA BAHAN -


C PERALATAN
Peralatan potong pipa T2/mekanik (cilinder shaw) hari 0.037 0 -
JUMLAH HARGA ALAT -

D Jumlah A + B + C 2,646.00
E Overhead & Profit 15% x D 396.90
F Harga Satuan Pekerjaan (D+E) 3,042.90

487241507.xlsx267/253 253 / 267 8.4.2 potong pipa


A. 8.4.2. 65 Pemotongan 1 buahPipa baja Ø 100 mm 9,009.68

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.085 67,500.00 5,737.50
Tukang Pipa L.02 OH 0.017 81,000.00 1,377.00
Mandor L.04 OH 0.008 90,000.00 720.00
JUMLAH TENAGA KERJA 7,834.50
B BAHAN
Pipa baja Ø 100 mm buah 1.000 -

JUMLAH HARGA BAHAN -


C PERALATAN
Peralatan potong pipa T2/mekanik (cilinder shaw) hari 0.040 0 -
JUMLAH HARGA ALAT -

D Jumlah A + B + C 7,834.50
E Overhead & Profit 15% x D 1,175.18
F Harga Satuan Pekerjaan (D+E) 9,009.68

A. 8.4.2. 66 Pemotongan 1 buah Pipa baja Ø 125 mm 14,184.68

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.133 67,500.00 8,977.50
Tukang Pipa L.02 OH 0.027 81,000.00 2,187.00
Mandor L.04 OH 0.013 90,000.00 1,170.00
JUMLAH TENAGA KERJA 12,334.50
B BAHAN
Pipa baja Ø 125 mm buah 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik (cilinder shaw) hari 0.042 0 -
JUMLAH HARGA ALAT -

D Jumlah A + B + C 12,334.50
E Overhead & Profit 15% x D 1,850.18
F Harga Satuan Pekerjaan (D+E) 14,184.68

487241507.xlsx267/254 254 / 267 8.4.2 potong pipa


A. 8.4.2. 67 Pemotongan 1 buah Pipa baja Ø 150 mm 19,592.55

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.184 67,500.00 12,420.00
Tukang Pipa L.02 OH 0.037 81,000.00 2,997.00
Mandor L.04 OH 0.018 90,000.00 1,620.00
JUMLAH TENAGA KERJA 17,037.00
B BAHAN
Pipa baja Ø 150 mm buah 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik (cilinder shaw) hari 0.045 0 -
JUMLAH HARGA ALAT -

D Jumlah A + B + C 17,037.00
E Overhead & Profit 15% x D 2,555.55
F Harga Satuan Pekerjaan (D+E) 19,592.55

A. 8.4.2. 68 Pemotongan 1 buah Pipa baja Ø 200 mm 50,766.75

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.476 67,500.00 32,130.00
Tukang Pipa L.02 OH 0.095 81,000.00 7,695.00
Mandor L.04 OH 0.048 90,000.00 4,320.00
JUMLAH TENAGA KERJA 44,145.00
B BAHAN
Pipa baja Ø 200 mm buah 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik (cilinder shaw) hari 0.060 0 -
JUMLAH HARGA ALAT -

D Jumlah A + B + C 44,145.00
E Overhead & Profit 15% x D 6,621.75
F Harga Satuan Pekerjaan (D+E) 50,766.75

487241507.xlsx267/255 255 / 267 8.4.2 potong pipa


A. 8.4.2. 69 Pemotongan 1 buah Pipa baja Ø 250 mm 70,685.33

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.663 67,500.00 44,752.50
Tukang Pipa L.02 OH 0.133 81,000.00 10,773.00
Mandor L.04 OH 0.066 90,000.00 5,940.00
JUMLAH TENAGA KERJA 61,465.50
B BAHAN
Pipa baja Ø 250 mm buah 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik (cilinder shaw) hari 0.068 0 -
JUMLAH HARGA ALAT -

D Jumlah A + B + C 61,465.50
E Overhead & Profit 15% x D 9,219.83
F Harga Satuan Pekerjaan (D+E) 70,685.33

A. 8.4.2. 70 Pemotongan 1 buah Pipa baja Ø 300 mm 79,368.98

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.745 67,500.00 50,287.50
Tukang Pipa L.02 OH 0.149 81,000.00 12,069.00
Mandor L.04 OH 0.074 90,000.00 6,660.00
JUMLAH TENAGA KERJA 69,016.50
B BAHAN
Pipa baja Ø 300 mm buah 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik (cilinder shaw) hari 0.072 0 -
JUMLAH HARGA ALAT -

D Jumlah A + B + C 69,016.50
E Overhead & Profit 15% x D 10,352.48
F Harga Satuan Pekerjaan (D+E) 79,368.98

487241507.xlsx267/256 256 / 267 8.4.2 potong pipa


A. 8.4.3. HARGA SATUAN PEKERJAAN PEMASANGAN AKSESORIS PIPA

A. 8.4.3. 1 Pemasangan 1 buah Valve Ø 150 mm 192,328.88

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.429 67,500.00 96,457.50
Tukang Pipa L.02 OH 0.715 81,000.00 57,915.00
Mandor L.04 OH 0.143 90,000.00 12,870.00
JUMLAH TENAGA KERJA 167,242.50
B BAHAN
Valve Ø 150 mm buah 1.000 -

JUMLAH HARGA BAHAN -


C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.100 -
JUMLAH HARGA ALAT -

D Jumlah A + B + C 167,242.50
E Overhead & Profit 15% x D 25,086.38
F Harga Satuan Pekerjaan (D+E) 192,328.88

A. 8.4.3. 2 Pemasangan 1 buah Valve Ø 200 mm 230,577.30

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.714 67,500.00 115,695.00
Tukang Pipa L.02 OH 0.857 81,000.00 69,417.00
Mandor L.04 OH 0.171 90,000.00 15,390.00
JUMLAH TENAGA KERJA 200,502.00
B BAHAN
Valve Ø 200 mm buah 1.000 -

JUMLAH HARGA BAHAN -


C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.300 -
JUMLAH HARGA ALAT -

D Jumlah A + B + C 200,502.00
E Overhead & Profit 15% x D 30,075.30
F Harga Satuan Pekerjaan (D+E) 230,577.30

487241507.xlsx267/257 257 / 267 8.4.3 akseoris pipa


A. 8.4.3. 3 Pemasangan 1 buah Valve Ø 250 mm 230,577.30

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.714 67,500.00 115,695.00
Tukang Pipa L.02 OH 0.857 81,000.00 69,417.00
Mandor L.04 OH 0.171 90,000.00 15,390.00
JUMLAH TENAGA KERJA 200,502.00
B BAHAN
Valve Ø 250 mm buah 1.000 -

JUMLAH HARGA BAHAN -


C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.400 -
JUMLAH HARGA ALAT -

D Jumlah A + B + C 200,502.00
E Overhead & Profit 15% x D 30,075.30
F Harga Satuan Pekerjaan (D+E) 230,577.30

A. 8.4.3. 4 Pemasangan 1 buah Valve Ø 300 mm 269,100.00

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 2.000 67,500.00 135,000.00
Tukang Pipa L.02 OH 1.000 81,000.00 81,000.00
Mandor L.04 OH 0.200 90,000.00 18,000.00
JUMLAH TENAGA KERJA 234,000.00
B BAHAN
Valve Ø 300 mm buah 1.000 -

JUMLAH HARGA BAHAN -


C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.500 -
JUMLAH HARGA ALAT -

D Jumlah A + B + C 234,000.00
E Overhead & Profit 15% x D 35,100.00
F Harga Satuan Pekerjaan (D+E) 269,100.00

487241507.xlsx267/258 258 / 267 8.4.3 akseoris pipa


A. 8.4.3. 15 Pemasangan 1 buah Tee Ø 150 mm 14,262.30

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.106 67,500.00 7,155.00
Tukang Pipa L.02 OH 0.053 81,000.00 4,293.00
Mandor L.04 OH 0.011 90,000.00 954.00
JUMLAH TENAGA KERJA 12,402.00
B BAHAN
Tee Ø 150 mm buah 1.000 -

JUMLAH HARGA BAHAN -


C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.028 -
JUMLAH HARGA ALAT -

D Jumlah A + B + C 12,402.00
E Overhead & Profit 15% x D 1,860.30
F Harga Satuan Pekerjaan (D+E) 14,262.30

A. 8.4.3. 16 Pemasangan 1 buah Tee Ø 200 mm 29,062.80

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.216 67,500.00 14,580.00
Tukang Pipa L.02 OH 0.108 81,000.00 8,748.00
Mandor L.04 OH 0.022 90,000.00 1,944.00
JUMLAH TENAGA KERJA 25,272.00
B BAHAN
Tee Ø 200 mm buah 1.000 -

JUMLAH HARGA BAHAN -


C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.029 -
JUMLAH HARGA ALAT -

D Jumlah A + B + C 25,272.00
E Overhead & Profit 15% x D 3,790.80
F Harga Satuan Pekerjaan (D+E) 29,062.80

487241507.xlsx267/259 259 / 267 8.4.3 akseoris pipa


A. 8.4.3. 17 Pemasangan 1 buah Tee Ø 250 mm 43,863.30

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.326 67,500.00 22,005.00
Tukang Pipa L.02 OH 0.163 81,000.00 13,203.00
Mandor L.04 OH 0.033 90,000.00 2,934.00
JUMLAH TENAGA KERJA 38,142.00
B BAHAN
Tee Ø 250 mm buah 1.000 -

JUMLAH HARGA BAHAN -


C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.039 -
JUMLAH HARGA ALAT -

D Jumlah A + B + C 38,142.00
E Overhead & Profit 15% x D 5,721.30
F Harga Satuan Pekerjaan (D+E) 43,863.30

A. 8.4.3. 18 Pemasangan 1 buah Tee Ø 300 mm 58,663.80

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.436 67,500.00 29,430.00
Tukang Pipa L.02 OH 0.218 81,000.00 17,658.00
Mandor L.04 OH 0.044 90,000.00 3,924.00
JUMLAH TENAGA KERJA 51,012.00
B BAHAN
Tee Ø 300 mm buah 1.000 -

JUMLAH HARGA BAHAN -


C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.500 -
JUMLAH HARGA ALAT -

D Jumlah A + B + C 51,012.00
E Overhead & Profit 15% x D 7,651.80
F Harga Satuan Pekerjaan (D+E) 58,663.80

487241507.xlsx267/260 260 / 267 8.4.3 akseoris pipa


A. 8.4.4. HARGA SATUAN PEKERJAAN PENYAMBUNGAN PIPA BARU KE LAMA

A. 8.4.4. 1 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 80 mm 197,250.30

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.466 67,500.00 98,955.00
Tukang Pipa L.02 OH 0.733 81,000.00 59,373.00
Mandor L.04 OH 0.147 90,000.00 13,194.00
JUMLAH TENAGA KERJA 171,522.00
B BAHAN
Pipa Ø 80 mm buah 1.000 -

JUMLAH HARGA BAHAN -


C PERALATAN
Peralatan potong pipa T2/mekanik/cilinder saw hari 0.606 -
Sewa Genset 1500 watt hari 0.075 -
Sewa pompa Submarsible 3m3/h hari 0.968 -
Sewa Tripot/Tackel & handle crane 2 T hari 0.965 -
JUMLAH HARGA ALAT -

D Jumlah A + B + C 171,522.00
E Overhead & Profit 15% x D 25,728.30
F Harga Satuan Pekerjaan (D+E) 197,250.30

A. 8.4.4. 2 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 100 mm 221,469.30

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.646 67,500.00 111,105.00
Tukang Pipa L.02 OH 0.823 81,000.00 66,663.00
Mandor L.04 OH 0.165 90,000.00 14,814.00
JUMLAH TENAGA KERJA 192,582.00
B BAHAN
Pipa Ø 100 mm buah 1.000 -

JUMLAH HARGA BAHAN -


C PERALATAN
Peralatan potong pipa T2/mekanik/cilinder saw hari 0.650 -
Sewa Genset 1500 watt hari 0.159 -
Sewa pompa Submarsible 3m /h3
hari 1.078 -
Sewa Tripot/Tackel & handle crane 2 T hari 0.911 -
JUMLAH HARGA ALAT -

D Jumlah A + B + C 192,582.00
E Overhead & Profit 15% x D 28,887.30
F Harga Satuan Pekerjaan (D+E) 221,469.30

487241507.xlsx 261 / 267 8.4.4 smbung pipa baru ke lama


A. 8.4.4. 3 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 150 mm 282,016.80

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 2.096 67,500.00 141,480.00
Tukang Pipa L.02 OH 1.048 81,000.00 84,888.00
Mandor L.04 OH 0.210 90,000.00 18,864.00
JUMLAH TENAGA KERJA 245,232.00
B BAHAN
Pipa Ø 150 mm buah 1.000 -

JUMLAH HARGA BAHAN -


C PERALATAN
Peralatan potong pipa T2/mekanik/cilinder saw hari 0.760 -
Sewa Genset 1500 watt hari 0.369 -
Sewa pompa Submarsible 3m /h3
hari 1.353 -
Sewa Tripot/Tackel & handle crane 2 T hari 1.026 -
JUMLAH HARGA ALAT -

D Jumlah A + B + C 245,232.00
E Overhead & Profit 15% x D 36,784.80
F Harga Satuan Pekerjaan (D+E) 282,016.80

A. 8.4.4. 4 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 200 mm 342,564.30

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 2.546 67,500.00 171,855.00
Tukang Pipa L.02 OH 1.273 81,000.00 103,113.00
Mandor L.04 OH 0.255 90,000.00 22,914.00
JUMLAH TENAGA KERJA 297,882.00
B BAHAN
Pipa Ø 200 mm buah 1.000 -

JUMLAH HARGA BAHAN -


C PERALATAN
Peralatan potong pipa T2/mekanik/cilinder saw hari 0.870 -
Sewa Genset 1500 watt hari 0.579 -
Sewa pompa Submarsible 3m3/h hari 1.628 -
Sewa Tripot/Tackel & handle crane 2 T hari 1.141 -
JUMLAH HARGA ALAT -

D Jumlah A + B + C 297,882.00
E Overhead & Profit 15% x D 44,682.30
F Harga Satuan Pekerjaan (D+E) 342,564.30

487241507.xlsx 262 / 267 8.4.4 smbung pipa baru ke lama


A. 8.4.4. 5 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 250 mm 403,111.80

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 2.996 67,500.00 202,230.00
Tukang Pipa L.02 OH 1.498 81,000.00 121,338.00
Mandor L.04 OH 0.300 90,000.00 26,964.00
JUMLAH TENAGA KERJA 350,532.00
B BAHAN
Pipa Ø 250 mm buah 1.000 -

JUMLAH HARGA BAHAN -


C PERALATAN
Peralatan potong pipa T2/mekanik/cilinder saw hari 0.980 -
Sewa Genset 1500 watt hari 0.789 -
Sewa pompa Submarsible 3m /h3
hari 1.903 -
Sewa Tripot/Tackel & handle crane 2 T hari 1.256 -
JUMLAH HARGA ALAT -

D Jumlah A + B + C 350,532.00
E Overhead & Profit 15% x D 52,579.80
F Harga Satuan Pekerjaan (D+E) 403,111.80

A. 8.4.4. 6 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 300 mm 463,659.30

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 3.446 67,500.00 232,605.00
Tukang Pipa L.02 OH 1.723 81,000.00 139,563.00
Mandor L.04 OH 0.345 90,000.00 31,014.00
JUMLAH TENAGA KERJA 403,182.00
B BAHAN
Pipa Ø 300 mm buah 1.000 -

JUMLAH HARGA BAHAN -


C PERALATAN
Peralatan potong pipa T2/mekanik/cilinder saw hari 1.090 -
Sewa Genset 1500 watt hari 0.999 -
Sewa pompa Submarsible 3m3/h hari 2.178 -
Sewa Tripot/Tackel & handle crane 2 T hari 1.371 -
JUMLAH HARGA ALAT -

D Jumlah A + B + C 403,182.00
E Overhead & Profit 15% x D 60,477.30
F Harga Satuan Pekerjaan (D+E) 463,659.30

487241507.xlsx 263 / 267 8.4.4 smbung pipa baru ke lama


A. 8.4.5. HARGA SATUAN PEKERJAAN PENGETESAN PIPA

A. 8.4.5. 1 Pengetesan 1 m Pipa Ø 50 mm 1,490.40

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.008 67,500.00 540.00
Mandor L.04 OH 0.0008 90,000.00 72.00
JUMLAH TENAGA KERJA 612.00
B BAHAN
Air test (air bersih) m3 0.002 72,000.00 144.00
Bahan bakar liter 0.060 8,100.00 486.00
Oli liter 0.002 27,000.00 54.00

JUMLAH HARGA BAHAN 684.00


C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 1,296.00
E Overhead & Profit 15% x D 194.40
F Harga Satuan Pekerjaan (D+E) 1,490.40

A. 8.4.5. 2 Pengetesan 1 m Pipa Ø 75 mm 1,656.00

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.008 67,500.00 540.00
Mandor L.04 OH 0.0008 90,000.00 72.00
JUMLAH TENAGA KERJA 612.00
B BAHAN
Air test (air bersih) m3 0.004 72,000.00 288.00
Bahan bakar liter 0.060 8,100.00 486.00
Oli liter 0.002 27,000.00 54.00

JUMLAH HARGA BAHAN 828.00


C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 1,440.00
E Overhead & Profit 15% x D 216.00
F Harga Satuan Pekerjaan (D+E) 1,656.00

487241507.xlsx267/264 264 / 267 8.4.5 tes pipa


A. 8.4.5. 3 Pengetesan 1 m Pipa Ø 100 mm 1,987.20

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.008 67,500.00 540.00
Mandor L.04 OH 0.0008 90,000.00 72.00
JUMLAH TENAGA KERJA 612.00
B BAHAN
Air test (air bersih) m3 0.008 72,000.00 576.00
Bahan bakar liter 0.060 8,100.00 486.00
Oli liter 0.002 27,000.00 54.00

JUMLAH HARGA BAHAN 1,116.00


C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 1,728.00
E Overhead & Profit 15% x D 259.20
F Harga Satuan Pekerjaan (D+E) 1,987.20

A. 8.4.5. 4 Pengetesan 1 m Pipa Ø 150 mm 2,815.20

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.008 67,500.00 540.00
Mandor L.04 OH 0.0008 90,000.00 72.00
JUMLAH TENAGA KERJA 612.00
B BAHAN
Air test (air bersih) m3 0.018 72,000.00 1,296.00
Bahan bakar liter 0.060 8,100.00 486.00
Oli liter 0.002 27,000.00 54.00

JUMLAH HARGA BAHAN 1,836.00


C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 2,448.00
E Overhead & Profit 15% x D 367.20
F Harga Satuan Pekerjaan (D+E) 2,815.20

487241507.xlsx267/265 265 / 267 8.4.5 tes pipa


A. 8.4.5. 5 Pengetesan 1 m Pipa Ø 200 mm 3,891.60

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.008 67,500.00 540.00
Mandor L.04 OH 0.0008 90,000.00 72.00
JUMLAH TENAGA KERJA 612.00
B BAHAN
Air test (air bersih) m3 0.031 72,000.00 2,232.00
Bahan bakar liter 0.060 8,100.00 486.00
Oli liter 0.002 27,000.00 54.00

JUMLAH HARGA BAHAN 2,772.00


C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 3,384.00
E Overhead & Profit 15% x D 507.60
F Harga Satuan Pekerjaan (D+E) 3,891.60

A. 8.4.5. 6 Pengetesan 1 m Pipa Ø 250 mm 5,382.00

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.008 67,500.00 540.00
Mandor L.04 OH 0.0008 90,000.00 72.00
JUMLAH TENAGA KERJA 612.00
B BAHAN
Air test (air bersih) m3 0.049 72,000.00 3,528.00
Bahan bakar liter 0.060 8,100.00 486.00
Oli liter 0.002 27,000.00 54.00

JUMLAH HARGA BAHAN 4,068.00


C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 4,680.00
E Overhead & Profit 15% x D 702.00
F Harga Satuan Pekerjaan (D+E) 5,382.00

487241507.xlsx267/266 266 / 267 8.4.5 tes pipa


A. 8.4.5. 7 Pengetesan 1 m Pipa Ø 300 mm 7,203.60

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.008 67,500.00 540.00
Mandor L.04 OH 0.0008 90,000.00 72.00
JUMLAH TENAGA KERJA 612.00
B BAHAN
Air test (air bersih) m3 0.071 72,000.00 5,112.00
Bahan bakar liter 0.060 8,100.00 486.00
Oli liter 0.002 27,000.00 54.00

JUMLAH HARGA BAHAN 5,652.00


C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah A + B + C 6,264.00
E Overhead & Profit 15% x D 939.60
F Harga Satuan Pekerjaan (D+E) 7,203.60

487241507.xlsx267/267 267 / 267 8.4.5 tes pipa

Anda mungkin juga menyukai