KABUPATEN BOJONEGORO
Kecamatan Desa
Sumberrejo Sambongre
DAFTAR HARGA SATUAN UNTUK PERENCANAAN
BAHAN - UPAH - ALAT
No J E N I S VOL SAT HARGA
A BAHAN
1 Koral 1/2 1 m3 Rp 300,000
2 Pasir Cor 1 m3 Rp 290,000
3 Semen 40 Kg 1 zak Rp 48,000
4 Pasir Urug 1 m3 Rp 65,000
5 Tanah Urug 1 m4 Rp 65,000
6 Besi Ø 10 1 ljr Rp 70,000
7 Besi Ø 6 1 ljr Rp 25,000
8 Kawat bendrat 1 kg Rp 15,000
9 Paku 1 kg Rp 18,000
10 Kayu 4/6 - 3m 1 btg Rp 32,000
11 Kayu 2/3 - 2.5m 1 btg Rp 8,000
12 Papan bekesting triplek 8 mm 1 lbr Rp 100,000
B UPAH
1 Pekerja 1 OH Rp 60,000
2 Tukang Batu 1 OH Rp 80,000
3 Tukang Besi 1 OH Rp 80,000
4 Tukang kayu 1 OH Rp 80,000
5 Mandor 1 OH Rp 85,000
B PERENCANAAN DIMENSI :
: PATOK P0 P1 P2 P3 P4
: POSISI TPT Kn Kn Kn Kn Kn
B : Lebar Atas 0.20 ###
T1
T1 : Tinggi Talud 1.00
P : Panjang Talud 100.0
D : Lebar Pondasi 0.70 0.60 0.60 0.60 0.60
P
T2 : Kedalaman Pondasi 0.20 0.20 0.20 0.20 0.20
DD Dia Strous 0.25 ### - - -
T2
Tinggi Strous 1.00 - - - -
Jumlah Strous 33.00 - - - -
Luas Talud atas 0.30 - - - -
T3 Luas Pondasi 0.14 0.12 0.12 0.12 0.12
Luas Srous 0.79 ### - - -
Volume Talud atas 30 0 0 0 0
Volume Pondasi 14.00 - - - -
Volume Strous 0.41 - - - -
Galian Pondasi 14.41 0.00 0.00 0.00 0.00
Volume Plesteran 30.00 0.00 0.00 0.00 0.00
T1 Besi Ø 10 87.00 0.00 0.00 0.00 0.00
T2 Besi Ø 10 43.00 2.00 2.00 2.00 2.00
T3 Besi Ø 10 165.00 0.00 0.00 0.00 0.00
T3 Besi Ø 6 8.00 0.00 0.00 0.00 0.00
Tebal pasir urug 0.05
Volume Pasir urug 100.75
Volume Siar
KEBUTUHAN BAHAN, ALAT DAN UPAH TENAGA
Provinsi : Jawa Timur
Kabupaten : Bojonegoro
Asumsi Perencanaan :
Plesteran = Panjang Talud x Lebar yang akan di plester ( bagaian atas talud )
AN UPAH TENAGA KERJA ( SNI )
Sumber
Kecamatan :
rejo
Sambo
Desa :
ngre
Upah Total Kebutuhan
Rp. Rp. Bahan dan Upah
Bahan Kebutuhan dibulatkan Sat
10,789,200 Koral 1/2 35.96 36.00 m3
17,902,080 Pasir Cor 24.15 24.00 m3
7,004,544 Semen 40 Kg 372.96 373.00 zak
1,243,200 1,243,200 Pasir Urug 10.31 10.00 m3
568,320 568,320 Tanah Urug 50.03 50.00 m3
25,795,000 Besi Ø 10 368.50 369.00 ljr
220,000 Besi Ø 6 8.80 9.00 ljr
666,000 Kawat bendrat 44.40 44.00 kg
4,972,800 4,972,800 Paku 13.32 13.00 kg
10,389,600 10,389,600 Kayu 4/6 - 3m 50.03 50.00 btg
199,800 Kayu 2/3 - 2.5m 5.00 5.00 btg
239,760 Papan bekesting tripl 2.00 2.00 lbr
Upah
336,000 336,000 Pekerja 37.70 38.00 OH
47,600 47,600 Tukang Batu 15.54 16.00 OH
Tukang Besi 62.16 62.00 OH
Tukang kayu 7.10 7.00 OH
670,313 Mandor 3.77 4.00 OH
108,000 108,000
15,141 15,141
7,221,500
1,818,000 1,818,000
257,550 257,550
1,600,800
40,020
19,756,200 92,065,200
Kabupaten : Bojonegoro
Kecamatan : Sumberrejo
Desa : Sambongre
Perhitungan Volume Timbunan
VOLUME Harga
Satuan Jumlah Swadaya
URAIAN Dari Satuan Jumlah ( Rp )
Total P3MD ( Rp )
Swadaya ( Rp. )
BAHAN a b c=a-b d e f=bxe g=cxe
1 Koral 1/2 36 - 36 m3 300,000 - 10,800,000
2 Pasir Cor 24 - 24 m3 290,000 - 6,960,000
3 Semen 40 Kg 373 - 373 zak 48,000 - 17,904,000
4 Pasir Urug 10 - 10 m3 65,000 - 650,000
5 Tanah Urug 50 - 50 m4 65,000 - 3,250,000
6 Besi Ø 10 369 - 369 ljr 70,000 - 25,830,000
7 Besi Ø 6 9 - 9 ljr 25,000 - 225,000
8 Kawat bendrat 44 - 44 kg 15,000 - 660,000
9 Paku 13 - 13 kg 18,000 - 234,000
10 Kayu 4/6 - 3m 50 - 50 btg 32,000 - 1,600,000
11 Kayu 2/3 - 2.5m 5 - 5 btg 8,000 - 40,000
12 Papan bekesting triplek 8 2 - 2 ljr 100,000 - 200,000
Sub Total 1) - 68,353,000
ALAT
1 Bambu 5 - 5 btg 15,000 - 75,000
2 Benang 10 - 10 roll 3,500 - 35,000
3 Cikrak 2 - 2 bh 7,500 - 15,000
4 Ember Cor 5 - 5 bh 15,000 - 75,000
5 Slang Timbangan 10 - 10 m' 2,500 - 25,000
6 Kuas 3 - 3 bh 4,500 - 13,500
7 Prasasti 1 - 1 bh 300,000 300,000
8 Papan Proyek 1 - 1 bh 250,000 - 250,000
Sub Total 1 ) - - -
ALAT
Bambu 5 5 - btg 15,000 - - -
Benang 10 10 - roll 3,500 - - -
Cikrak 2 2 - bh 7,500 - - -
Ember Cor 5 5 - bh 15,000 - - -
Slang Timbangan 10 10 - m' 2,500 - - -
Kuas 3 3 - bh 4,500 - - -
Prasasti 1 1 - bh 300,000 - - -
Papan Proyek 1 1 - bh 250,000 - - -
Sub Total 2 )
UPAH - -
Pekerja 38 38 - OH 60,000 - - -
Tukang Batu 16 16 - OH 80,000 - - -
Tukang Besi 62 62 - OH 80,000 - - -
Tukang kayu 7 7 - OH 80,000 - - -
Mandor 4 4 - OH 85,000 - - -
Sub Total 3 ) - - -
TOTAL BIAYA SWADAYA - - -
Swadaya Selain Uang - -
Sumber Dana
Swadaya Uang - -
REKAPITULASI RENCANA ANGGARAN BIAYA
22 agustus 2021
GAMBAR RENCANA
PROPINSI JAWA TIMUR
Bojonegoro
Sumberrejo
Rencana Urugan Peddel
DESA Sambongre
20 80
±0.00
Jalan Paving JENIS PRASARANA
-0.05
Pipa PVC. Ø 2''
TPT BETON
100
Rencana Urugan
Cor Beton
Tanah
LOKASI
20
Dusun Jenak
JUDUL GAMBAR
80
Strous Ø25-80
Dibuat Oleh :
rokim
Tim Pelaksana Kegiatan
Diperiksa Oleh
Dilatasi per 12 m
Pipa PVC Ø 2 ", Jarak 2m Besi Ø 9.60 mm - 200 mm
A Cor Beton
Besi Ø 9.60 mm - 200 mm
100
120
20
KASMUDJI, SH
Sekretaris Desa