Anda di halaman 1dari 1

U

P.37A P.38A
6A 201 87 200 P.3
P.29A P.3 198 73 198
48
69
9A Bangunan Sadap (Baru)
00 201 20
2018 64 202 38 23 19 0 34 B.Kp. 1
200 19 1 87 8
20 65

5A
02 20 0 21
199
200 08

19 9 48
P.3 9 91

P.3

19 78
12

9 28
19 95

19
8
19 0 27

0A
20
8

P.31A
P.34A
200 04
198 96
200 84

199 37
198 77
199 72
P. 99 1982
3A

32
P.3199 21 6

1 98

A
1 9
19
44 87 2
19 9 4
19

)
(Baru
dap
Sa
an
un
ng
Ba p. 1
B.K

Skala Horizontal :
0 10 20 30 40 50 100 150 200

Skala Vertical :
0.0 0.5 1.0 1.5 2.0 2.5 5.0 7.5 10.0

BIDANG PERSAMAAN/REFERENCE LEVEL : 193.000


PATOK HEKTOMETER/HECTOMETER STONE Hm 1 +100 Hm 1 +200 Hm 1 +300
NOMOR PROFIL

PROFILE NUMBER P.30A P.31A P.32A P.33A P.34A P.35A P.36A P.37A P.38A P.39A
JARAK PROFIL/DISTANCE

1021.68

1055.64

1093.02

1105.96

1147.55

1193.40

1224.72

1259.54

1300.20

1322.41
33.96 37.38 41.59 45.85 31.32 34.82 40.66 22.21
ACCUMULATED DISTANCE
ELEVASI TANGGUL KIRI

199.91

200.04

199.19

199.21

199.37

199.48

201.00

201.87

200.48

200.34
YANG ADA/EXISTING

LEFT BANK LEVEL


ELEVASI TANGGUL KANAN

200.27

200.84

199.44

199.42

199.72

199.28

201.81

202.38

201.23

200.21
RIGHT BANK LEVEL
ELEVASI DASAR SALURAN PADA AS
198.95

198.96

198.82

198.76

198.77

198.78

198.64

198.73

198.69

198.65
BED LEVEL AT CENTER LINE
ELEVASI TANAH ASLI PADA AS SALURAN
198.96

198.97

198.82

198.76

198.77

198.78

198.64

198.73

198.69

198.65
GROUND LEVEL AT CENTER LINE

ELEVASI TANGGUL
199.53

199.51

199.48

199.47

199.44

199.41

199.38

199.36

199.33

199.31
BANK LEVEL
ELEVASI MUKA AIR RENCANA
199.13

199.11

199.08

199.07

199.04

199.01

198.98

198.96

198.93

198.91
RENCANA/DESIGN

DESIGNED WATER LEVEL


ELEVASI DASAR SALURAN
198.80

198.78

198.75

198.74

198.71

198.68

198.65

198.63

198.60

198.58
BED LEVEL
TRACE SALURAN/ALIGNMENT 33.90 37.41 12.94 41.61 45.83 31.30 34.82 40.76 22.16
TRACE/CENTRE ALIGNMENT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
TIPE BANGUNAN
TYPE OF STRUCTURE
DIMENSI SALURAN DAN DATA TAMBAHAN A = 106.30 Ha. Q = 0.161 m3/dt. v = 0.36 m/dt.
b = 1.00 m. h = 0.33 m. i = 0.000749
CANAL DIMENSIONS AND ADDITIONAL DATA m = 1.00 k = 35.00 w = 0.40 m.

PROPINSI :
KEMENTRIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT JAWA BARAT

KETERANGAN : DIREKTORAT JENDERAL SUMBERDAYA AIR PEKERJAAN :


SATUAN KERJA BALAI BESAR WILAYAH SUNGAI CITARUM
SID - DI KEWENANGAN PROVINSI
Bangunan Bagi Sadap (IPDMIP) DI KABUPATEN SUKABUMI
BAGIAN GAMBAR :
POTONGAN MEMANJANG DESA : SIRNASARI
SALURAN SEKUNDER CIKUPA KECAMATAN : SURADE
Bangunan Sadap PROFIL : P.30A s.d P.39A KABUPATEN : SUKABUMI

DIGAMBAR : Apit Agustian NO. REGISTER : 4 - 08 - 02 - 76


AZTINDO REKAPERDANA PT. DIRENCANA : Rohman Budiman, ST NO./JML. LEMBAR : 76 / 97
DIPERIKSA : Kiagus Muhammad ali, ST, SP.1
TANGGAL NOMOR KONTRAK
KETUA DIREKSI : Dani Hamdan, ST.,M.Sc
20/12/2018 HK.02.03/PPK.PP-Av/11/2018
No Rev Tgl Yang Direvisi Oleh Direnc Diset PPK PERENC. DAN PROGRAM : Ir. Ariani Arifin, MPSDA

Anda mungkin juga menyukai