P.37A P.38A
6A 201 87 200 P.3
P.29A P.3 198 73 198
48
69
9A Bangunan Sadap (Baru)
00 201 20
2018 64 202 38 23 19 0 34 B.Kp. 1
200 19 1 87 8
20 65
5A
02 20 0 21
199
200 08
19 9 48
P.3 9 91
P.3
19 78
12
9 28
19 95
19
8
19 0 27
0A
20
8
P.31A
P.34A
200 04
198 96
200 84
199 37
198 77
199 72
P. 99 1982
3A
32
P.3199 21 6
1 98
A
1 9
19
44 87 2
19 9 4
19
)
(Baru
dap
Sa
an
un
ng
Ba p. 1
B.K
Skala Horizontal :
0 10 20 30 40 50 100 150 200
Skala Vertical :
0.0 0.5 1.0 1.5 2.0 2.5 5.0 7.5 10.0
PROFILE NUMBER P.30A P.31A P.32A P.33A P.34A P.35A P.36A P.37A P.38A P.39A
JARAK PROFIL/DISTANCE
1021.68
1055.64
1093.02
1105.96
1147.55
1193.40
1224.72
1259.54
1300.20
1322.41
33.96 37.38 41.59 45.85 31.32 34.82 40.66 22.21
ACCUMULATED DISTANCE
ELEVASI TANGGUL KIRI
199.91
200.04
199.19
199.21
199.37
199.48
201.00
201.87
200.48
200.34
YANG ADA/EXISTING
200.27
200.84
199.44
199.42
199.72
199.28
201.81
202.38
201.23
200.21
RIGHT BANK LEVEL
ELEVASI DASAR SALURAN PADA AS
198.95
198.96
198.82
198.76
198.77
198.78
198.64
198.73
198.69
198.65
BED LEVEL AT CENTER LINE
ELEVASI TANAH ASLI PADA AS SALURAN
198.96
198.97
198.82
198.76
198.77
198.78
198.64
198.73
198.69
198.65
GROUND LEVEL AT CENTER LINE
ELEVASI TANGGUL
199.53
199.51
199.48
199.47
199.44
199.41
199.38
199.36
199.33
199.31
BANK LEVEL
ELEVASI MUKA AIR RENCANA
199.13
199.11
199.08
199.07
199.04
199.01
198.98
198.96
198.93
198.91
RENCANA/DESIGN
198.78
198.75
198.74
198.71
198.68
198.65
198.63
198.60
198.58
BED LEVEL
TRACE SALURAN/ALIGNMENT 33.90 37.41 12.94 41.61 45.83 31.30 34.82 40.76 22.16
TRACE/CENTRE ALIGNMENT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
TIPE BANGUNAN
TYPE OF STRUCTURE
DIMENSI SALURAN DAN DATA TAMBAHAN A = 106.30 Ha. Q = 0.161 m3/dt. v = 0.36 m/dt.
b = 1.00 m. h = 0.33 m. i = 0.000749
CANAL DIMENSIONS AND ADDITIONAL DATA m = 1.00 k = 35.00 w = 0.40 m.
PROPINSI :
KEMENTRIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT JAWA BARAT