Anda di halaman 1dari 62

URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN

1. Jenis Peralatan VIBRATORY ROLLER 5-8 T.


2. Tenaga Pw 60.0 HP
3. Kapasitas Cp 8.0 Ton
4. Umur Ekonomis A 6.0 Tahun
5. Jam Operasi Dalam 1 Tahun W 1,500.0 Jam
6. Harga Setempat B 770,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA

1. Nilai Sisa Alat = 10 % x B C 77,000,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.30071 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 138,926.05 Rupiah
W

b. Asuransi dan Lain-lain = 0.020 x C F 1,026.67 Rupiah


W

Biaya Pasti per Jam = (E+F) G 139,952.72 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H #REF! Rupiah


2. Pelumas = (0.010-0.020 Ltr/HP/Jam) x Pw x Mp I #REF! Rupiah

3. Workshop =
(6,25 % - 8,75 %) x B J 0.00 Rupiah
W
4. Sparepart = (12,5 % - 17,5 %) x B K 77,000.00 Rupiah
W
5. Operator = ( 1 Orang / Jam ) x U1 L #REF! Rupiah
6. Pembantu Operat= ( 1 Orang / Jam ) x U2 M #REF! Rupiah

Biaya Operasi per Jam = (H+I+J+K+L+M) P #REF! Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S #REF! Rupiah


PPN #REF! Rupiah
Total #REF! Rupiah
E. LAIN - LAIN

1. Tingkat Suku Bunga i 20.00 % / Tahun


2. Upah Operator / Sopir U1 #REF! Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 #REF! Rp./Jam
4. Bahan Bakar Bensin Mb #REF! Liter
5. Bahan Bakar Solar Ms #REF! Liter
6. Minyak Pelumas Mp #REF! Liter
7. Pajak Pertambahan Nilai PPN 10.00 %
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN

1. Jenis Peralatan BULLDOZER 100-150 HP


2. Tenaga Pw 140.0 HP
3. Kapasitas Cp - -
4. Umur Ekonomis A 6.0 Tahun
5. Jam Operasi Dalam 1 Tahun W 1,500.0 Jam
6. Harga Setempat B 650,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA

1. Nilai Sisa Alat = 10 % x B C 65,000,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.30071 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 117,275.24 Rupiah
W

b. Asuransi dan Lain-lain = 0.020 x C F 866.67 Rupiah


W

Biaya Pasti per Jam = (E+F) G 118,141.91 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H #REF! Rupiah


2. Pelumas = (0.010-0.020 Ltr/HP/Jam) x Pw x Mp I #REF! Rupiah

3. Workshop =
(6,25 % - 8,75 %) x B J 0.00 Rupiah
W
4. Sparepart = (12,5 % - 17,5 %) x B K 65,000.00 Rupiah
W
5. Operator = ( 1 Orang / Jam ) x U1 L #REF! Rupiah
6. Pembantu Operat= ( 1 Orang / Jam ) x U2 M #REF! Rupiah

Biaya Operasi per Jam = (H+I+J+K+L+M) P #REF! Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S #REF! Rupiah


PPN #REF! Rupiah
Total #REF! Rupiah
E. LAIN - LAIN

1. Tingkat Suku Bunga i 20.00 % / Tahun


2. Upah Operator / Sopir U1 #REF! Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 #REF! Rp./Jam
4. Bahan Bakar Bensin Mb #REF! Liter
5. Bahan Bakar Solar Ms #REF! Liter
6. Minyak Pelumas Mp #REF! Liter
7. Pajak Pertambahan Nilai PPN 10.00 %
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN

1. Jenis Peralatan WATER TANKER 3000-4500 L.


2. Tenaga Pw 125.0 HP
3. Kapasitas Cp 4,000.0 Liter
4. Umur Ekonomis A 6.0 Tahun
5. Jam Operasi Dalam 1 Tahun W 1,500.0 Jam
6. Harga Setempat B 123,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA

1. Nilai Sisa Alat = 10 % x B C 12,300,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.30071 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 22,192.08 Rupiah
W

b. Asuransi dan Lain-lain = 0.020 x C F 164.00 Rupiah


W

Biaya Pasti per Jam = (E+F) G 22,356.08 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H #REF! Rupiah


2. Pelumas = (0.010-0.020 Ltr/HP/Jam) x Pw x Mp I #REF! Rupiah

3. Workshop =
(6,25 % - 8,75 %) x B J 0.00 Rupiah
W
4. Sparepart = (12,5 % - 17,5 %) x B K 12,300.00 Rupiah
W
5. Operator = ( 1 Orang / Jam ) x U1 L #REF! Rupiah
6. Pembantu Operat= ( 1 Orang / Jam ) x U2 M #REF! Rupiah

Biaya Operasi per Jam = (H+I+J+K+L+M) P #REF! Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S #REF! Rupiah


PPN #REF! Rupiah
Total #REF! Rupiah
E. LAIN - LAIN

1. Tingkat Suku Bunga i 20.00 % / Tahun


2. Upah Operator / Sopir U1 #REF! Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 #REF! Rp./Jam
4. Bahan Bakar Bensin Mb #REF! Liter
5. Bahan Bakar Solar Ms #REF! Liter
6. Minyak Pelumas Mp #REF! Liter
7. Pajak Pertambahan Nilai PPN 10.00 %
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN

1. Jenis Peralatan MOTOR GRADER >100 HP


2. Tenaga Pw 125.0 HP
3. Kapasitas Cp - -
4. Umur Ekonomis A 6.0 Tahun
5. Jam Operasi Dalam 1 Tahun W 1,500.0 Jam
6. Harga Setempat B 1,100,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA

1. Nilai Sisa Alat = 10 % x B C 110,000,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.30071 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 198,465.79 Rupiah
W

b. Asuransi dan Lain-lain = 0.020 x C F 1,466.67 Rupiah


W

Biaya Pasti per Jam = (E+F) G 199,932.46 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H #REF! Rupiah


2. Pelumas = (0.010-0.020 Ltr/HP/Jam) x Pw x Mp I #REF! Rupiah

3. Workshop =
(6,25 % - 8,75 %) x B J 0.00 Rupiah
W
4. Sparepart = (12,5 % - 17,5 %) x B K 110,000.00 Rupiah
W
5. Operator = ( 1 Orang / Jam ) x U1 L #REF! Rupiah
6. Pembantu Operat= ( 1 Orang / Jam ) x U2 M #REF! Rupiah

Biaya Operasi per Jam = (H+I+J+K+L+M) P #REF! Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S #REF! Rupiah


PPN #REF! Rupiah
Total #REF! Rupiah
E. LAIN - LAIN

1. Tingkat Suku Bunga i 20.00 % / Tahun


2. Upah Operator / Sopir U1 #REF! Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 #REF! Rp./Jam
4. Bahan Bakar Bensin Mb #REF! Liter
5. Bahan Bakar Solar Ms #REF! Liter
6. Minyak Pelumas Mp #REF! Liter
7. Pajak Pertambahan Nilai PPN 10.00 %
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN

1. Jenis Peralatan DUMP TRUCK 3-4 M3


2. Tenaga Pw 100.0 HP
3. Kapasitas Cp 6.0 Ton
4. Umur Ekonomis A 6.0 Tahun
5. Jam Operasi Dalam 1 Tahun W 1,500.0 Jam
6. Harga Setempat B 125,750,000 Rupiah

B. BIAYA PASTI PER JAM KERJA

1. Nilai Sisa Alat = 10 % x B C 12,575,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.30071 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 22,688.25 Rupiah
W

b. Asuransi dan Lain-lain = 0.020 x C F 167.67 Rupiah


W

Biaya Pasti per Jam = (E+F) G 22,855.92 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H #REF! Rupiah


2. Pelumas = (0.010-0.020 Ltr/HP/Jam) x Pw x Mp I #REF! Rupiah

3. Workshop =
(6,25 % - 8,75 %) x B J 0.00 Rupiah
W
4. Sparepart = (12,5 % - 17,5 %) x B K 12,575.00 Rupiah
W
5. Sopir = ( 1 Orang / Jam ) x U1 L #REF! Rupiah
6. Pembantu Sopir = ( 1 Orang / Jam ) x U2 M #REF! Rupiah

Biaya Operasi per Jam = (H+I+J+K+L+M) P #REF! Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S #REF! Rupiah


PPN #REF! Rupiah
Total #REF! Rupiah
E. LAIN - LAIN

1. Tingkat Suku Bunga i 20.00 % / Tahun


2. Upah Operator / Sopir U1 #REF! Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 #REF! Rp./Jam
4. Bahan Bakar Bensin Mb #REF! Liter
5. Bahan Bakar Solar Ms #REF! Liter
6. Minyak Pelumas Mp #REF! Liter
7. Pajak Pertambahan Nilai PPN 10.00 %

URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN

1. Jenis Peralatan EXCAVATOR 80-140 HP


2. Tenaga Pw 80.0 HP
3. Kapasitas Cp 0.5 M3
4. Umur Ekonomis A 6.0 Tahun
5. Jam Operasi Dalam 1 Tahun W 1,500.0 Jam
6. Harga Setempat B 975,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA

1. Nilai Sisa Alat = 10 % x B C 97,500,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.30071 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 175,912.86 Rupiah
W

b. Asuransi dan Lain-lain = 0.020 x C F 1,300.00 Rupiah


W

Biaya Pasti per Jam = (E+F) G 177,212.86 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H #REF! Rupiah


2. Pelumas = (0.010-0.020 Ltr/HP/Jam) x Pw x Mp I #REF! Rupiah

3. Workshop =
(6,25 % - 8,75 %) x B J 0.00 Rupiah
W
4. Sparepart = (12,5 % - 17,5 %) x B K 97,500.00 Rupiah
W
5. Operator = ( 1 Orang / Jam ) x U1 L #REF! Rupiah
6. Pembantu Operat= ( 1 Orang / Jam ) x U2 M #REF! Rupiah

Biaya Operasi per Jam = (H+I+J+K+L+M) P #REF! Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S #REF! Rupiah


PPN #REF! Rupiah
Total #REF! Rupiah
E. LAIN - LAIN

1. Tingkat Suku Bunga i 20.00 % / Tahun


2. Upah Operator / Sopir U1 #REF! Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 #REF! Rp./Jam
4. Bahan Bakar Bensin Mb #REF! Liter
5. Bahan Bakar Solar Ms #REF! Liter
6. Minyak Pelumas Mp #REF! Liter
7. Pajak Pertambahan Nilai PPN 10.00 %

URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN

1. Jenis Peralatan WHEEL LOADER 1.0-1.6 M3


2. Tenaga Pw 125.0 HP
3. Kapasitas Cp 1.5 M3
4. Umur Ekonomis A 6.0 Tahun
5. Jam Operasi Dalam 1 Tahun W 1,500.0 Jam
6. Harga Setempat B 1,160,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA

1. Nilai Sisa Alat = 10 % x B C 116,000,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.30071 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 209,291.20 Rupiah
W

b. Asuransi dan Lain-lain = 0.020 x C F 1,546.67 Rupiah


W

Biaya Pasti per Jam = (E+F) G 210,837.87 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H #REF! Rupiah


2. Pelumas = (0.010-0.020 Ltr/HP/Jam) x Pw x Mp I #REF! Rupiah

3. Workshop = (6,25 % - 8,75 %) x B J 0.00 Rupiah


W
4. Sparepart = (12,5 % - 17,5 %) x B K 116,000.00 Rupiah
W
5. Operator = ( 1 Orang / Jam ) x U1 L #REF! Rupiah
6. Pembantu Operat= ( 1 Orang / Jam ) x U2 M #REF! Rupiah

Biaya Operasi per Jam = (H+I+J+K+L+M) P #REF! Rupiah


D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S #REF! Rupiah
PPN #REF! Rupiah
Total #REF! Rupiah
E. LAIN - LAIN

1. Tingkat Suku Bunga i 20.00 % / Tahun


2. Upah Operator / Sopir U1 #REF! Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 #REF! Rp./Jam
4. Bahan Bakar Bensin Mb #REF! Liter
5. Bahan Bakar Solar Ms #REF! Liter
6. Minyak Pelumas Mp #REF! Liter
7. Pajak Pertambahan Nilai PPN 10.00 %
PROGRAM PEMBANGUNAN INFRASTRUKTUR PERDESAAN
(PPIP)

RENCANA ANGGARAN BIAYA (RAB)


( Rincian Bahan, Alat, Upah )

Propinsi : Sulawesi Tenggara No. Rab. : ..../.../.../2009


Kabupaten : Kolaka Program : PPIP
Kecamatan : Wolo Jenis Kegiatan : Perkerasan Jalan
Desa : Donggala Ukuran : 1070 M'

Volume Harga Sat. Jumlah Total ( Rp. )


No. Uraian Sat.
Total Swadaya Dana (Rp) Swadaya Dana
I BAHAN
1 Pek. Urugan Pilihan #REF! #REF! M3 #REF! #REF!
2 Pek. Lapis Perkerasan Kelas C #REF! 0 #REF! M3 #REF! #REF! #REF!
Sub.Total I #REF! #REF!
II ALAT
1 Pek. Pembersihan Damija #REF! #REF! M2 #REF! #REF! #REF!
2 Pek. Urugan Pilihan #REF! #REF! M3 #REF! #REF! #REF!
3 Pek. Lapis Perkerasan Kelas C #REF! #REF! M3 #REF! #REF! #REF!
4 Mobilisasi/Demobilisasi Alat 1.00 1.00 Unit 23,100,000.00 - 23,100,000
5 Lori-lori 1.00 1.00 Bh #REF! #REF!
6 Skop 5.00 5.00 Bh #REF! #REF!
Sub.Total II #REF! #REF!
III UPAH
1 Mandor #REF! #REF! M2 #REF! #REF! #REF!
2 Pekerja #REF! #REF! M3 #REF! #REF! #REF!
3 Pek. Lapis Perkerasan Kelas C #REF! #REF! M3 #REF! #REF! #REF!
Sub.Total III #REF! #REF!
Total Biaya #REF! #REF!
Sumber Dana Dari PPIP #REF!
PPIP Dibulatkan #REF!
Dari Swadaya #REF!

Donggala, .........Mei 2009

Diperiksa Oleh : Dibuat Oleh : Dibuat Oleh :


Fasilitator Ketua OMS Kader Desa

(Bahar, S.Sos) (Joni Seru Datu, ST) (………………………...) (…………………………….)


FK-P FK-T
PROGRAM PEMBANGUNAN INFRASTRUKTUR PERDESAAN
(PPIP)

RENCANA ANGGARAN BIAYA (RAB)


( Rincian Bahan, Alat, Upah )

Propinsi : Sulawesi Tenggara No. Rab. : ..../.../.../2009


Kabupaten : Kolaka Program : PPIP
Kecamatan : Wolo Jenis Kegiatan : Duyker Plat
Desa : Donggala Ukuran : 1x1x4 M'

Volume Harga Sat. Jumlah Total ( Rp. )


No. Uraian Sat.
Total Swadaya Dana (Rp) Swadaya Dana
I. BAHAN
1 Pek. Urugan Pasir #REF! #REF! M3 #REF! #REF!
2 Pek. Batu Kosong #REF! #REF! M3 #REF! #REF!
3 Pek. Pas. Pondasi Batu Gunung 1:4 #REF! #REF! M3 #REF! #REF!
4 Pek. Plesteran Dilicin 1:3 #REF! #REF! M2 #REF! #REF!
5 Pek. Beton Tak Bertulang #REF! #REF! M3 #REF! #REF!
6 Pek. Pembesian #REF! #REF! Kg #REF! #REF!
7 Pek. Bekisting/Cetakan Beton #REF! #REF! M2 #REF! #REF!
Sub.Total I - #REF!
II ALAT
1 Pacul 1.00 1.00 Bh #REF! #REF!
2 Skopang 1.00 1.00 Bh #REF! #REF!
3 Lori-Lori / Archo 1.00 1.00 Bh #REF! #REF!
Sub.Total II #REF!
III UPAH
1 Pek. Galian Tanah #REF! #REF! M3 #REF! #REF!
2 Pek. Urugan Kembali #REF! #REF! M3 #REF! #REF!
3 Pek. Urugan Pasir #REF! #REF! M3 #REF! #REF!
4 Pek. Batu Kosong #REF! #REF! M3 #REF! #REF!
5 Pek. Pas. Pondasi Batu Gunung 1:4 #REF! #REF! M3 #REF! #REF!
6 Pek. Plesteran Dilicin 1:3 #REF! #REF! M2 #REF! #REF!
7 Pek. Beton Tak Bertulang #REF! #REF! M3 #REF! #REF!
8 Pek. Pembesian #REF! #REF! Kg #REF! #REF!
9 Pek. Bekisting/Cetakan Beton #REF! #REF! M2 #REF! #REF!
Sub.Total III - #REF!
Total Biaya #REF! #REF!
Sumber Dana Dari PPIP #REF!
PPIP Dibulatkan #REF!
Dari Swadaya #REF!

Donggala, .........Mei 2009

Diperiksa Oleh : Dibuat Oleh : Dibuat Oleh :


Fasilitator Ketua OMS Kader Desa

(Bahar, S.Sos) (Joni Seru Datu, ST)


FK-P FK-T (………………………...) (…………………………….)
Diperiksa Oleh : Dibuat Oleh : Dibuat Oleh :
Fasilitator Ketua OMS Kader Desa

(Bahar, S.Sos) (Joni Seru Datu, ST)


FK-P FK-T (………………………...) (…………………………….)

PROGRAM PEMBANGUNAN INFRASTRUKTUR PERDESAAN


(PPIP)

RENCANA ANGGARAN BIAYA (RAB)


( Rincian Bahan, Alat, Upah )

Propinsi : Sulawesi Tenggara No. Rab. : ..../.../.../2009


Kabupaten : Kolaka Program : PPIP
Kecamatan : Wolo Jenis Kegiatan : Saluran Pasangan
Desa : Donggala Ukuran : 13,54 mtr

Volume Harga Sat. Jumlah Total ( Rp. )


No. Uraian Sat.
Total Swadaya Dana (Rp) Swadaya Dana
I. BAHAN
1 Pek. Pas. Pondasi Batu Gunung 1:4 #REF! #REF! M3 #REF! #REF!
2 Pek. Plesteran Dilicin 1:3 #REF! #REF! M2 #REF! #REF!
Sub.Total I - #REF!
II ALAT
1 Pacul 5.00 5.00 Bh #REF! #REF!
2 Skopang 2.00 2.00 Bh #REF! #REF!
3 Lori-Lori / Archo 1.00 1.00 Bh #REF! #REF!
Sub.Total II #REF!
III UPAH
1 Pek. Galian Tanah #REF! #REF! M3 #REF! #REF!
2 Pek. Pas. Pondasi Batu Gunung 1:4 #REF! #REF! M3 #REF! #REF!
3 Pek. Plesteran Dilicin 1:3 #REF! #REF! M2 #REF! #REF!
Sub.Total III - #REF!
Total Biaya #REF! #REF!
Sumber Dana Dari PPIP #REF!
PPIP Dibulatkan #REF!
Dari Swadaya #REF!

Donggala, .........Mei 2009

Diperiksa Oleh : Dibuat Oleh : Dibuat Oleh :


Fasilitator Ketua OMS Kader Desa

(Bahar, S.Sos) (Joni Seru Datu, ST) (………………………...) (…………………………….)


FK-P FK-T
DAFTAR ANALISA
KEGIATAN : PROGRAM PEMBANGUNAN INFRASTRUKTUR PERDESAAN (PPIP)
TAHUN ANGGARAN : 2009
LOKASI : DESA DONGGALA KEC. WOLO KAB. KOLAKA

I. ANALISA PEKERJAAN KONSTRUKSI DEUKER PLAT DAN SALURAN

1. 1 M3, GALIAN TANAH BIASA, ( SEDALAM 1 M )


Tenaga
0.400 Oh Pekerja #REF! Rp #REF!
0.040 Oh Kepala Kelompok #REF! Rp #REF!
JUMLAH Rp #REF!

2. 1 M3, PEKERJAAN URUGAN KEMBALI BEKAS GALIAN


Tenaga
0.192 Oh Pekerja #REF! Rp #REF!
0.019 Oh Kepala Kelompok #REF! Rp #REF!
JUMLAH Rp #REF!

3. 1 M3, PEKERJAAN URUGAN PASIR


Bahan
1.200 M3 Pasir #REF! Rp #REF!
A Rp #REF!
Tenaga
0.300 Oh Pekerja #REF! Rp #REF!
0.010 Oh Kepala Kelompok #REF! #REF!
B Rp #REF!
JUMLAH ( A+B ) Rp #REF!

4. 1 M3, PASANGAN BATU KOSONG


Bahan
1.200 M3 Batu gunung / Kali #REF! Rp #REF!
0.300 M3 Pasir #REF! Rp #REF!
A Rp #REF!
Tenaga
0.780 Oh Pekerja #REF! Rp #REF!
0.390 Oh Tukang Batu #REF! Rp #REF!
0.039 Oh Kepala Kelompok #REF! Rp #REF!
B Rp #REF!
JUMLAH ( A+B ) Rp #REF!

5. 1 M3, PASANGAN PONDASI BATU KALI / GUNUNG 1 : 4


Bahan
1.100 M3 Batu gunung / Kali #REF! Rp #REF!
163.000 Kg Semen portland #REF! Rp #REF!
0.520 M3 Pasir #REF! Rp #REF!
A Rp #REF!
Tenaga
1.500 Oh Pekerja #REF! Rp #REF!
0.600 Oh Tukang Batu #REF! Rp #REF!
0.075 Oh Kepala Kelompok #REF! Rp #REF!
B Rp #REF!
JUMLAH ( A+B ) Rp #REF!

6. 1 M2, PLESTERAN DILICIN 1 PC : 3 PS, TEBAL 15 MM


Bahan
6.480 Kg Semen Portland #REF! Rp #REF!
0.019 M3 Pasir Pasang #REF! Rp #REF!
A Rp #REF!

Tenaga
0.200 Oh Pekerja #REF! Rp #REF!
0.150 Oh Tukang Batu #REF! Rp #REF!
0.010 Oh Kepala Kelompok #REF! Rp #REF!
B Rp #REF!
JUMLAH ( A+B ) Rp #REF!

7. 1 M3, MEMBUAT BETON TAK BERTULANG (TANPA PERANCAH)


Bahan
0.810 M3 Kerikil Beton/Split #REF! Rp #REF!
0.540 M3 Pasir Beton #REF! Rp #REF!
336.000 Kg Semen portland #REF! Rp #REF!
A Rp #REF!
Tenaga
2.000 Oh Pekerja #REF! Rp #REF!
0.350 Oh Tukang Batu #REF! Rp #REF!
1.000 Oh Kepala Kelompok #REF! Rp #REF!
B Rp #REF!
JUMLAH (A+B) Rp #REF!

8. 1 KG PEKERJAAN PEMBESIAN
Bahan
1.050 Kg Besi Beton #REF! Rp #REF!
0.015 Kg Kawat Beton #REF! Rp #REF!
A Rp #REF!
Tenaga
0.007 Oh Pekerja #REF! Rp #REF!
0.007 Oh Tukang Batu #REF! Rp #REF!
0.0003 Oh Kepala Kelompok #REF! Rp #REF!
B Rp #REF!
JUMLAH (A+B) Rp #REF!

9. 1 M3 PEKERJAAN BEKISTING/CETAKAN BETON


Bahan
0.026 M3 Kayu Bekisting #REF! Rp #REF!
0.600 Kg Paku Campur #REF! Rp #REF!
0.500 Btg Kayu Dolken 8-10 cm #REF! Rp #REF!
A Rp #REF!
Tenaga
0.150 Oh Pekerja #REF! Rp #REF!
0.050 Oh Tukang Batu #REF! Rp #REF!
0.007 Oh Kepala Kelompok #REF! Rp #REF!
B Rp #REF!
JUMLAH (A+B) Rp #REF!
TIM PENGELOLA KEGIATAN ( TPK )

DASAR PERHITUNGAN

Propinsi : Sulawesi Tenggara No. Rab. : I/DD-Watumea/2018


Kabupaten : Kolaka Utara Program : P3MD
Kecamatan : Tiwu Jenis Kegiatan : Pemb. Posyandu
Desa : Watumea Volume : 7 x 15 m (1 unit)
GAMBAR/SKET PERHITUNGAN

Panjang Pondasi dapat dilihat pada DENA 1 Panjang Pondasi


Memanjang = 12.00 + 12.00 + 13 = 37.00
Memanjang = 4.00 + 3.00 + 4.5 = 11.50
Melintang = 7.00 + 7.00 + 7.00 = 21.00
Melintang = 7.00 + 1.50 + 5.00 = 13.50
Pjg.Tot Pondasi = 83.00 M' = 83.00 M'

Pjg.Pondasi Pagar = 7.86 + 7.48 + 7.18 = 22.52 M'

Gambar Terlampir 2. Galian Tanah = T rata2 = 0.55 + 0.75


= 0.65
2
L T P
Bangunan = 0.70 x 0.65 x 83.00 = 37.77 m3
Saluran = 0.45 x 0.15 x 18.00 = 1.22 m3
Pagar = 0.46 x 0.15 x 22.52 = 1.55 m3
Volume Galian = 40.53 m3

Gambar Terlampir 3. Urugan Kembali


Volume = 1/3 x Vol.galian tanah
Volume = 13.51 m3

Gambar Terlampir 4. Urugan Tanah L P T. Rata2


Lti Utama = 5.50 x 12.00 x 0.25 = 16.50
Lti Utama = 1.50 x 13.00 x 0.25 = 4.88
Lti Dapur+WC = 3.00 x 3.50 x 0.24 = 2.52
Lti Halaman Dpn = 7.00 x 6.65 x 0.14 = 6.28
= 2.00 x 1.50 x 0.14 = 0.41
30.58 m3
Tot Urugan = 30.58 m3

Gambar Terlampir 5. Urugan Pasir T x L x P


Pondasi = 0.05 x 0.70 x 83.00 = 2.91 m3
Lti utama = 0.05 x 5.50 x 12.00 = 3.30 m3
Lti utama = 0.05 x 1.50 x 13.00 = 0.98 m3
Lti Dapur+wc = 0.05 x 3.00 x 3.50 = 0.53 m3
Total = 7.71 m3 7.71 m3

Gambar Terlampir 6. Pas. Batu Kosong T x L x P


Bangunan = 0.20 x 0.70 x 83.00 = 11.62 m3
Pagar = 0.15 x 0.42 x 22.52 = 1.42 m3
Volume = 13.04 m3
DASAR PERHITUNGAN
GAMBAR/SKET PERHITUNGAN
Gambar Terlampir 7. Pas. Pondasi Batu Gunung/Kali
v = L Rata2 x T x P
(0.25 + 0.6)
Pondasi = x 0.65 x 83.00
2
= 22.93 m3

(0.2 + 0.25)
Talud = x 0.83 x 18.00
2
= 3.34 m3

(0.2 + 0.42)
Pagar = x 0.40 x 22.52
2
= 2.79 m3

Total = 29.06 m3

Gambar Terlampir 8. Pas. Dinding Batako 1:4


- Dinding Utama L x T
= 83.00 x 3.30 = 273.90 m2
= 273.90 m2
- Dinding Layang2 : L x T
Depan = 5.50 x 2.00 = 11.00 m2
= 1.50 x 1.00 = 1.50 m2
S.Kanan = 2.00 x 2.00 = 4.00 m2
= 10 x 1 = 10.00 m2
= 10 x 0.5 = 5.00 m2
S.Tengah = 2.00 x 0.50 = 1.00 m2
= 10 x 1 = 10.00 m2
= 10 x 0.5 = 5.00 m2
S.Kiri = 10.00 x 1.00 = 10.00 m2
T. Belakang = 5.50 x 0.45 = 2.48 m2
Pagar = 3.00 x 0.80 = 2.40 m2
= 1.00 x 0.80 = 0.80 m2
= 19.02 x 1.20 = 22.82 m2
= 86.00 m2
Total Dinding = 273.90 + 86.00 = 359.90 m2

Kusen/ Dinding Kosong


= L x T x Jlh/bh
Tipe PJ1 = 0.90 x 2.15 x 1 = 1.94 m2
1.30 x 1.25 x 1 = 1.63 m2
Tipe P1 = 1.10 x 2.15 x 2 = 4.73 m2
Tipe P2 = 0.90 x 2.15 x 2 = 3.87 m2
Tipe P3 = 0.70 x 1.90 x 2 = 2.66 m2
Tipe J1 = 1.35 x 1.40 x 6 = 11.34 m2
Ventilasi = 1.35 x 0.50 x 1 = 0.68 m2
Loster Kayu = 0.25 x 0.40 x 28 = 2.80 m2
Teras = 1.50 x 2.35 x 1 = 3.53 m2
Pintu Posyandu = 1.50 x 2.35 x 1 = 3.53 m2
= 1.50 x 1.35 x 1 = 2.03 m2
Posyandu-Teras = 2.00 x 2.35 x 1 = 4.70 m2
= 1.50 x 1.35 x 1 = 2.03 m2
Pagar = 0.15 x 0.60 x 29 = 2.61 m2
Total Dinding Kosong = 48.05 m2
Vol. Netto = 359.90 - 48.05 = 311.85 m2

Gambar Terlampir 9. Plesteran 1:4 t=15 mm


Volume = 2x Volume Pas. Bata = 311.85 x 2 = 623.71 m2
Volume P. Talud : = L Rata2 x P
Dinding Talud = 0.83 x 18 = 14.85 m2
Lantai Talud = 0.33 x 25 = 8.25 m2
Total Ple = 646.81 m2

DASAR PERHITUNGAN
GAMBAR/SKET PERHITUNGAN
10. Beton Bertulang
Gambar Terlampir a. Volume Sloof :
- Sloof Bangunan 16/20: = L x T x P
= 0.16 x 0.20 x 83.00
= 2.66 m3
- Sloof Pagar 12/15: = L x T x P
= 0.13 x 0.13 x 19.17
= 0.32 m3
Total Sloof = 2.98 m3

Gambar Terlampir c. Volume Kolom : = Tinggi x Titik


Kolom Uama 15/15 = 3.50 x 30.00 = 105.00 M'
Klm Atas Depan15/15 = 2.00 x 4.00 = 8.00 M'
Klm Atas S. Kanan 15/15 = 1.80 x 1.00 = 1.80 M'
= 1.48 x 1.00 = 1.48 M'
= 1.16 x 1.00 = 1.16 M'
= 1.00 x 1.00 = 1.00 M'
Gambar Terlampir Klm Atas Tengah 15/15 = 1.80 x 1.00 = 1.80 M'
= 1.55 x 1.00 = 1.55 M'
= 1.30 x 1.00 = 1.30 M'
= 1.00 x 1.00 = 1.00 M'
Klm Atas S. Kiri 15/15 = 1.50 x 6.00 = 9.00 M'
Klm Pagar 15/15 = 1.30 x 5.00 = 6.50 M'
= 2.10 x 1.00 = 2.10 M'
= 141.69 M'
Volume Kolom (V) V = L x T x P
Kolom wc 15/15 = 0.15 x 141.69 x 0.15
= 3.19 m3
Total Kolom = 3.19 m3

Gambar Terlampir d. Volume Ringbalk : = L x T x P


Ring. Tengah 15/20 = 0.15 x 0.20 x 83.00
= 2.49 m3
Ringbalk Gantung 16/25 = 0.16 x 0.25 x 5.00
= 0.20 m3
Ringbalk Gantung 15/20 = 0.15 x 0.20 x 8.50
(Area Teras Depan) = 0.26 m3
Ring. Penutup 13/13 = 0.13 x 0.13 x 31.00
= 0.52 m3
Ring. Miring 13/13 = 0.13 x 0.13 x 20.00
= 0.34 m3
Total Ringbalk = 3.81 m3

Gambar Terlampir e. Plat Beton = L x T x P


Plat Dapur+ wc = 3.20 x 0.10 x 3.90 = 1.25 m3
Plat Trs. depan = 0.35 x 0.10 x 3.60 = 0.13 m3
= 0.45 x 0.10 x 1.50 = 0.07 m3
= 0.45 x 0.10 x 2.00 = 0.09 m3
= 1.53 m3
Plat Konsol Jend = L x T x P
S.Kanan = 0.25 x 0.08 x 1.30 = 0.03
= 0.03 x 2.00 Titik = 0.05 m3
= 0.25 x 0.08 x 2.74 = 0.05 m3
S.Kiri = 0.25 x 0.08 x 1.30 = 0.03
= 0.03 x 3.00 Titik = 0.08 m3
Belakang = 0.25 x 0.08 x 1.30 = 0.03
= 0.03 x 2.00 Titik = 0.05 m3
Plat Meja Beton = 0.60 x 0.10 x 1.90 = 0.11 m3
Kaki Meja Beton = 0.12 x 1.00 x 0.60 = 0.07 m3
Plat Dekker = 1.10 x 0.15 x 3.50 = 0.58 m3
= 1.00 m3
Total Plat beton = 2.53 m3

DASAR PERHITUNGAN
GAMBAR/SKET PERHITUNGAN

Gambar Terlampir f. Rabat Beton 1:3:5


= P x L.rata2 x T
Lantai Saluran = 25.00 x 0.33 x 0.05 = 0.41 m3
Halaman Depan = 2.00 x 1.35 x 0.05 = 0.14 m3
= 5.73 x 6.85 x 0.05 = 1.96 m3
= 1.58 x 6.85 x 0.05 = 0.54 m3
3.05 m3
11 Pembesian :
Gambar Terlampir a Sloof bangunan 16/20 :
Besi 4ф12 = 83.00 x 4 Btg = 332.00 m'
Begel ф6-20 = 0.13 + 0.13 + 0.17 + 0.17
= 0.60 m'
Panjang 83.00
= x 0.60
Jarak 0.15 = 332.00 m'
b Sloof pagar 12/15 :
Besi 4ф10 = 19.17 x 4 Btg = 76.68 m'
Begel ф6-20 = 0.09 + 0.09 + 0.12 + 0.12
= 0.42 m'
Panjang 19.17
= x 0.42
Jarak 0.15 = 53.68 m'

Gambar Terlampir c Kolom 15/15 Pjg Tot.


Besi 4ф12 = 141.69 x 4 Btg = 566.8 m'
Begel ф6-20 = 0.12 + 0.12 + 0.12 + 0.12
= 0.48 m'
141.69
= x 0.48
0.15 = 453.4 m'

Gambar Terlampir d Ringbalk Utama Tengah + Teras 15/20


Pjg Tot.
Besi 4ф12 = 91.50 x 4 Btg = 366.0 m'
Begel ф6-20 = 0.12 + 0.12 + 0.17 + 0.17
= 0.58 m'
91.50
= x 0.58
0.15 = 353.8 m'
Gambar Terlampir e Ringbalk Utama Gantung 15/25
Besi 4ф12 = 5.00 x 4 Btg = 20.0 m'
Begel ф6-20 = 0.12 + 0.12 + 0.22 + 0.22
= 0.68 m'
5.00
= x 0.68
0.15 = 22.7 m'

Gambar Terlampir f Ringbalk Penutup 13/13


Besi 4ф10 = 51.00 x 4 Btg = 204.0 m'
Begel ф6-20 = 0.10 + 0.10 + 0.10 + 0.10
= 0.40 m'
51.00
= x 0.40
0.15 = 136.0 m'

g Pembesian Plat
3.90 1 Plat Dapur+Wc Besi ф10-15 :
- Memanjang :
3.90
Bentang/Jarak = = 26.00 + 1 = 27.00
0.15
3.20
Banjang Besi = 3.20 x 27.00 = 86.4 x 2
= 172.80 m'
- Melintang :
3.20
Bentang/Jarak = = 21.33 + 1 = 22.33
0.15
Banjang Besi = 3.90 x 22.33 = 87.1 x 2
= 174.20 m'

DASAR PERHITUNGAN
GAMBAR/SKET PERHITUNGAN
45 2 Plat Teras Besi ф10-15 :
45 - Memanjang :
2.00 1.50 7.10
Bentang/Jarak = = 47.33 + 1 = 48.33
0.15
7.10 Banjang Besi = 0.45 x 48.33 = 21.75 x 2
= 43.50 m'
3.60 - Melintang :
0.45
Bentang/Jarak = = 3.00 + 1.00 = 4.00
0.15
Banjang Besi = 7.10 x 4.00 = 28.40 x 2
= 56.80 m'
1.3
0.30 x 5 3 Plat Kanopi (Plat P.Jendela) Besi ф10-15 :
p = 6.50 - Memanjang :
0.30
Bentang/Jarak = = 2.00 + 1 = 3.00
0.15
Banjang Besi = 9.24 x 3.00 = 27.72 x 2
2.74 = 55.44 m'
0.30 X 1 - Melintang :
P = 2.74 9.24
Bentang/Jarak = = 61.60 + 1 = 62.60
0.15
Tot P = 9.24 Banjang Besi = 0.30 x 62.60 = 18.78 x 2
= 37.56 m'
4 Plat Meja Beton Besi ф10-10 :
- Memanjang :
1.90
Bentang/Jarak = = 19.00 + 1 = 20.00
0.10
Banjang Besi = 0.60 x 20.00 = 12.00 x 1
= 12.00 m'
- Melintang :
0.60
Bentang/Jarak = = 6.00 + 1 = 7.00
0.10
Banjang Besi = 1.90 x 7.00 = 13.30 x 1
= 13.30 m'
3.50 4 Plat Dekker Besi ф10-15 :
- Memanjang :
1.10 3.50
Bentang/Jarak = = 23.33 + 1 = 24.33
0.15
Banjang Besi = 1.10 x 24.33 = 26.77 x 2
= 53.53 m'
- Melintang :
1.10
Bentang/Jarak = = 7.33 + 1 = 8.33
0.15
Banjang Besi = 3.50 x 8.33 = 29.17 x 2
= 58.33 m'

Kebutuhan Besi:
1,284.76 m' x 1)
Total Besi ф12 =
12
= 107.00 btg = 1140.05 Kg

958.15 m' x 1)
Total Besi ф10 =
12
= 80.00 btg = 590.43 Kg
- m' x 1)
Total Besi ф8 =
12
= - btg = 0.00 Kg

1,297.87 m' x 1)
Total Besi ф6 =
12
= 108.00 btg = 287.92 Kg

DASAR PERHITUNGAN
GAMBAR/SKET PERHITUNGAN

12. Kuda-Kuda Kayu Kelas II


Gambar Terlampir a Kuda-Kuda A (4 unit)
- Kayu 6/12
Balok Tarik Memanj = 12.20 = 12.20 m'
Kaki KK = 12.67 = 12.67 m'
Tiang Raja = 1.70 = 1.70 m'
Siku Angin : = 2.40 + 2.54 + 2.50 = 7.44 m'
= + 2.51 = 2.51 m'
= 36.52 m'
= 36.52 x 4 unit = 146.08 m'

- Balok Gapit 5/10 = 1.51 + 1.32 + 1.12 = 3.95 m'


= 0.93 + 0.73 + 0.55 = 2.21 m'
= 6.16 m'
= 6.16 x 2 Gapit = 12.32 m'
= 12.32 x 4 unit = 49.28 m'

Gambar Terlampir b Kuda-Kuda B (2 unit)


- Kayu 6/12
Balok Tarik = 10.20 = 10.20 m'
Kaki KK = 10.50 = 10.50 m'
Tiang Raja = 1.20 = 1.20 m'
Siku Angin : = 2.20 = 2.20 m'
= 24.10 m'
= 24.10 x 2 unit = 48.20 m'

- Balok Gapit 5/10 = 1.02 + 0.90 + 0.78 = 2.70 m'


= 0.65 + 0.53 + 0.41 = 1.59 m'
= + 0.25 = 0.25 m'
= 4.54 m'
= 4.54 x 2 Gapit = 9.08 m'
= 9.08 X 2 unit = 18.16 m'

c Balok Tarik Melintang 5/10


P x JLH x SISI
Pjg. Blk A = 5.35 x 5 x 1 = 26.75 m'
Pjg. Blk B = 1.35 x 4 x 1 = 5.40 m'
= 32.15 m'
P x L x T
Pjg Tot Balok 6/12 194.28 x 0.06 x 0.12 = 1.40 m3
Pjg Tot Balok 5/10 99.59 x 0.05 x 0.10 = 0.50 m3

Baut / Sekrup
Mur Baut 20 mm (KK. A) = 15 x 4 = 60 Bh
Mur Baut 20 mm (KK. B) = 17 x 2 = 34 Bh
= 94 Bh

Gambar Terlampir 13 Gording Kayu 5/10


P x JLH x SISI
a Pjg. Gording A = 5.5 x 17 x 1 = 93.50 m'
b Pjg. Gording B = 1.5 x 14 x 1 = 21.00 m'
= 114.50 m'
P x L x T
Pjg Tot Balok 5/10 114.50 x 0.05 x 0.10 = 0.57 m3

Gambar Terlampir 14. Atap Spandeck


Bangunan Utama L x P x Jlm
Luas atap A = 5.5 x 12.67 x 1 = 69.69 m2
Luas atap B = 1.5 x 10.5 x 1 = 15.75 m2
Total 85.44 m2

DASAR PERHITUNGAN
GAMBAR/SKET PERHITUNGAN

Gambar Terlampir 16 Lisplank


a Bangunan Utama : Pjg Lbr sisi
Pjg. Lisplank a = 7.30 x 2 = 14.60 m'
Pjg. Lisplank b = 1.80 x 2 = 3.60 m'
Pjg. L. Sudut b = 0.51 x 2 x 2 = 2.04 m'
Pjg. L. Sudut b = 0.35 x 2 x 2 = 1.40 m'
21.64 m'

Panjang = 21.64 m'


Lebar = 0.40 m'
Total = 8.66 m2

Total Luasan Listplang: Total Pjg Listplang : 21.64 m'


= 8.66 m2 / 4 M' = 5.41 Lbr
Dibulatkan = 6.00 Lbr

Gambar Terlampir 17 Tegel Keramik Polos 40x40cm


P x L
Tegel Ruangan = 15.00 x 7.00 = 105.00 m2
Dikurangi;
- WC 2 Unit = 1.50 x 1.50 x 2 = 4.50 m2
- Kosong = 2.00 x 1.50 x = 3.00 m2
7.50 m2
Netto 105.00 - 7.50 = 97.50 m2
Tegel Tangga = 2.90 x 1.05 = 3.05 m2
Meja Beton = 1.90 x 0.70 = 1.33 m2
Total 101.88 m2

Gambar Terlampir 18 Tegel Keramik 20x20cm(Anti Slip)


Lantai WC = 1.50 x 1.50 x 2 = 4.50 m2
= 4.50 m2

Gambar Terlampir 19 Tegel Dinding Keramik 20x25cm


Dinding WC: Pjg = 1.50 + 1.50 + 1.5 + 1.5
= 6.00 x 2.00 unit = 12.00 m'
Tinggi = 1.50 m'
= 12.00
= 18.00 m2

21 Kuku Tegel Pjg x Jlh


Pintu Double = 1.20 x 2.00 = 2.40 m'
Pintu Wc = 0.70 x 2.00 = 1.40 m'
Pintu 2 = 0.90 x 2.00 = 1.80 m'
Tangga 1 = 1.55 x 3.00 = 4.65 m'
= 1.05 x 2.00 = 2.10 m'
Tangga 2 = 0.35 x 3.00 = 1.05 m'
= 1.05 x 2.00 = 2.10 m'
Total = 15.50 m'
Dibulatkan = 16.00 m'
Gambar Terlampir 22 Rangka Plafond
Dalam Ruang P x L x sisi
= 10 x 7 x 1 = 70.00 m2
= 7 x 2 x 1 = 14.00 m2
Luar Ruang = 7.3 x 0.51 x 1 = 3.72 m2
= 1.8 x 0.35 x 1 = 0.63 m2
88.35
= 88.35 m2

23 Plafond Tripleks=Vol. Rangka Plafond


Volume = 88.35 m2

DASAR PERHITUNGAN
GAMBAR/SKET PERHITUNGAN

Gambar Terlampir 24 Les Plafond


- Rg. Posyandu = 3.00 + 3.00 + 4.00 + 4.00
= 14.00 m'
- Rg. Periksa = 2.50 + 2.50 + 4.00 + 4.00
= 13.00 m'
- Rg. Bersalin = 4.00 + 4.00 + 6.50 + 6.50
= 21.00 m'
- Rg. Tidur = 3.50 + 3.50 + 3.00 + 3.00
= 13.00 m'
- WC 1 unit = 1.50 + 1.50 + 1.50 + 1.50
= 6.00 m'
- Teras = 1.50 + 1.50 + 2.00 + 2.00
= 7.00 m'
- ( Rg. Tamu & = 8.00 + 8.00 + 3.00 + 1.50
Rg. Makan ) 1.50 + 1.50 + 1.50 = 25.00 m'
- Belakang = 5.65 + 0.51 + 0.51 = 6.67 m'
= 105.67 m'

25 Pengecatan Tembok = Luasan Plesteran


Luas Plesteran = 646.81 m2

26 Pengecetan Plafond = Luasan Plafond = 88.35 m2

27 Pengecatan Atap=Pemasangan Atap = 0.00 m2

Analisa Perhitungan 1 m2 Batako


P x L x T
Ukuran Batako: = 35.00 x 10.00 x 15.00 cm
Tebal Spesi = 1 Cm
15 batako
10
35 Untuk Mencari Luasan dinding digunakan Panjang x Tinggi
Jadi Luas Batako + Spesi :
P x T
Luasan 1 batako = 0.35 x 0.15 = 0.0525 m2
Ditambahkan masing-masing 1 cm untuk spesi Menjadi
= 0.16 x 0.36 = 0.0576 m2
Kebutuhan
1 m2 Batako = 1 : 0.0576 = 17.36 m2
DASAR PERHITUNGAN
GAMBAR/SKET PERHITUNGAN

28 Pengecatan Kayu
a. Lisplank = 8.66 m2

Daun Pintu : T L Sisi Bh


P1 = 2.10 x 1.00 x 2 x 2.00 m2
= 8.40 m2
P2 = 2.10 x 0.80 x 2 x 2.00 m2
= 6.72 m2
PJ1 = 2.10 x 0.80 x 2 x 1.00 m2
= 3.36 m2

Daun Jendela : T x L x Btg x sisi


J1 h = 0.60 x 0.07 x 4.00 x 2
= 0.34 m2
v = 1.30 x 0.07 x 4.00 x 2
= 0.73 m2
= 1.06 m2 x 6 Bh = 6.38 m2

PJ1 h = 0.60 x 0.07 x 4.00 x 2


= 0.34 m2
v = 1.03 x 0.07 x 4.00 x 2
= 0.58 m2
= 0.91 m2 x 1 Bh = 0.91 m2

Kusen Pintu&Jendela P L Bh
P1 = 5.30 x 0.23 x 2.00 = 2.44 m2
P2 = 5.10 x 0.23 x 2.00 = 2.35 m2
= 4.78 m2
P L Btg
PJ1 h = 2.20 x 0.23 x 1 = 0.51 m2
h = 1.30 x 0.23 x 1 = 0.30 m2
v = 2.10 x 0.23 x 2 = 0.97 m2
v = 1.15 x 0.23 x 2 = 0.53 m2
= 2.30 m2 x 1 Bh = 2.30 m2

J1 h = 1.35 x 0.23 x 2 = 0.62 m2


v = 1.30 x 0.23 x 3 = 0.90 m2
= 1.52 m2 x 6 Bh = 9.11 m2

Ventilasi h = 1.35 x 0.23 x 2 = 0.62 m2


v = 0.40 x 0.23 x 3 = 0.28 m2
= 0.90 m2 x 1 Bh = 0.90 m2

Loster K h = 0.15 x 0.23 x 2 = 0.07 m2


v = 0.30 x 0.23 x 2 = 0.14 m2
= 0.21 m2 x 18 Bh = 3.73 m2

Total Pengecetan Kayu = 55.25 m2

Watumea, Januari 2018

Dibuat Oleh :
PELAKSANA KEGIATAN

MUH. YUSUF
Ketua TPK
2.00
2.00
2.75
2.00
21.00 6.00 2.00 10.00

650,000.00
216,666.67

Err:522

27
5
32.00
16.00
22.52 7.86
18.52 7.47
3.65 3.60
14.87 18.93
7.10
12 14 12 besi
#REF! #REF! #REF! #REF!
12 12 12 12.00

#REF! #REF!
25.30
2.108333333

111.87
9.322222222

Bj
0.887 1,139.58 0.47
Pjg
0.006165 12 12 1,140.56

0.62
594.05 (3.62)
0.006165 10 10 590.70
0.393 -

0.006165 8 8 -

0.22 285.53 2.39

0.006165 6 6 288.05
2,019.17 2,019.31
6 4 24
24

1.05 0.3
2.9
3.045

30
30
900
DAFTAR ANALISA BAHAN DAN HOK

Desa : Lapolu Kecamatan : tiwu Kabupaten : Kolaka Utara

Tegel Tegel Pipa PVC


Krikil Pasir Pasir Tanah Semen Semen Batu Bata Tegel Closet Pipa PVC Pekerja Tukang
Pasang Urug Urug Warna 40 x 20 x 20 25 x Dususk AW 3" AW
NO. URAIAN PEKERJAAN SAT. VOLUME KOEF. 40 20 1/2"

( M3 ) ( M3 ) ( M3 ) ( M3 ) ( Zak ) ( Kg ) ( Bh ) ( Dos ) ( Dos ) ( Dos ) ( Bh ) ( HOK ) ( HOK )


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 1 M³ GALIAN TANAH BIASA SEDALAM 1 M
Bahan
-
Tenaga
Pekerja HOK 51.75 0.450 23.29

2 1 M³ PASANGAN RABAT BETON 1 Pc : 4 Psr


Bahan
Kerikil M3 0.8200 42.44
Pasir M3 0.5200 26.91
Semen Portland (50 Kg) Zak 3.2600 168.71
51.75
Tenaga
Pekerja HOK 4.600 238.05
Tukang Batu HOK 1.800 93.15

3 1 M³ PASANGAN PASIR URUG 1 Pc : 4 Psr


Pasir M3 1.2000 33.12
Tenaga 27.60
Pekerja HOK 0.4000 11.04

TOTAL 42.44 60.03 - - 168.71 - - - - - - - - 272.38 93.15


DIBULATKAN 41.00 60.00 - - 169.00 - - - - - - - - 272.38 93.00

6 25 20 4 4 ........Januari 2020
Disetujui Oleh : - - - - - Dibuat Oleh :
TIM PENYUSUN RKPDes PELAKSANA KEGIATAN

Ismail Saleh.S.Kom H.BURHAN


Ketua Ketua TPK
P 30

90,561,022
90,561,022
289,203,227
90561021.8122
TIM PENGELOLA KEGIATAN ( TPK )
SURVEY HARGA BAHAN, ALAT DAN UPAH

Desa : Lapolu
Kecamatan : Tiwu
Kabupaten : Kolaka Utara
BY. PENGUMPUL
No. URAIAN SATUAN HARGA / PENGISIAN TRUK BY. TRANSPORT HARGA TOTAL
(Rp) (Rp) (Rp) (Rp.)
1 2 3 4 5 6 7
A. DAFTAR BAHAN :
1 Batu Gunung M3 - 133,000 100,000 233,000
2 Pasir Pasang M3 - 67,000 100,000 167,000
3 Kerikil/ Batu Pecah M3 300,000 300,000
4 Tanah Urug/Timbunan Pilihan M3 83,000 83,000
5 Pasir Urug M3 - 67,000 100,000 167,000
6 Batako Bh 4,000 4,000
7 Semen Portland 50 Kg Zak 75,000 75,000
8 Semen Warna 25 Kg Kg 25,000 25,000
9 Balok Kayu Kelas II M3 3,500,000 3,500,000
10 Papan Kayu Kelas II M3 3,500,000 3,500,000
11 Papan Kayu Kelas III M3 2,000,000 2,000,000
12 Dolken Kayu Dia 15 / 400 cm Btg 10,000 10,000
13 Papan Listplank Kls I 2x2/20 Lbr 50,000 50,000
14 Kusen Pintu P1 (Double) Mata 350,000 350,000
15 Kusen Pintu P2 Tunggal) Mata 325,000 325,000
16 Kesen Jendela J1 Mata 300,000 300,000
17 Kesen Ventilasi + Kaca Mati 5mm Mata 275,000 275,000
18 Kusen + Pintu Aluminium Set 800,000 800,000
19 Loster Kayu Mata 50,000 50,000
20 Daun Pintu Panil Mata 750,000 750,000
21 Daun Jendela J1 + Kaca 5 mm Mata 325,000 325,000
22 Daun Jendela PJ1 + Kaca 5 mm Mata 325,000 325,000
23 Kunci Tanam Bh 150,000 150,000
24 Engsel Pintu Bh 25,000 25,000
25 Engsel Jendela Bh 15,000 15,000
26 Grendel Jendela Bh 5,000 5,000
27 Kait Angin Psg 27,000 27,000
28 Tripleks Tebal 4 mm Lbr 95,000 95,000
29 Tripleks Tebal 9 mm Lbr 180,000 180,000
30 List Profil Plafond 3 x 3 M' 20,000 20,000
31 Besi Beton Polos Ø 12 mm Pjg. 12 m Btg 120,000 120,000
32 Besi Beton Polos Ø 10 mm Pjg. 12 m Btg 95,000 95,000
33 Besi Beton Polos Ø 6 mm Pjg. 12 m Btg 35,000 35,000
34 Kawat Beton Kg 25,000 25,000
35 Paku Campur Kg 25,000 25,000
36 Paku Tripleks Kg 125,000 125,000
37 Baut/Mur 20 mm Bh 12,500 12,500
38 Atap Spandek 0,3 mm M' 55,000 55,000
39 Sekrup Atap bh 700 700
40 Nok Spandek 0,3 mm M' 35,000 35,000
41 Cat Kayu Kg 75,000 75,000
42 Cat Tembok Kg 20,000 20,000
43 Cat Atap Kg 32,000 32,000
44 Cet Plafond Kg 20,000 20,000
45 Plamir Kg 10,000 10,000
46 Cat Meni Liter 10,000 10,000
47 Kuas Biasa 3 cm Bh 10,000 10,000
48 Kuas Biasa 5 cm Bh 20,000 20,000
49 Kuas Rool Bh 30,000 30,000
50 Kloset Jongkok Bh 280,000 280,000
51 Floor Drain Bh 5,000 5,000
52 Bak Fiberglass 0.3M3 Bh 350,000 350,000
53 Wastafel Bh 475,000 475,000
BY. PENGUMPUL
No. URAIAN SATUAN HARGA / PENGISIAN TRUK BY. TRANSPORT HARGA TOTAL
(Rp) (Rp) (Rp) (Rp.)
1 2 3 4 5 6 7

54 Pipa PVC Ø 3" AW Btg 90,000 90,000


55 Pipa PVC Ø 2" AW Btg 60,000 60,000
56 Pipa PVC Ø 1/2" AW Btg 25,000 25,000
57 Sambungan Pipa PVC Ø 3" AW Bh 18,000 18,000
58 Sambungan Pipa PVC Ø 2" AW Bh 14,000 14,000
59 Sambungan Pipa PVC Ø 1/2" AW Bh 5,000 5,000
60 Seal Tape Bh 10,000 10,000
61 Kran Air dia 1/2" Bh 20,000 20,000
62 Meteran Air Unit 1,800,000 1,800,000
63 Tegel Keramik 40x40 cm Dos 80,000 80,000
64 Tegel Keramik 20x20 cm (anti slip) Dos 75,000 75,000
65 Tegel Dinding 20x25 cm Dos 75,000 75,000
66 Kuku Tegel M' 20,000 20,000
67 Besi Pengaman Jendela Mata 350,000 350,000
68 Pintu Pagar Besi (rell) M2 450,000 450,000
69 Instalasi Listrik + Fitting + Saklar + Meteran 4,500,000 4,500,000
70 Balon / Lampu Lilin (23 watt) Bh 75,000 75,000
71 Lampu Pagar bulat Bh 350,000 350,000

B. PENGADAAN MOBILER
1 Meja Biro Bh 2,000,000 2,000,000
2 Kursih Puturah Bh 350,000 350,000
3 Lemari Arsif Bh 2,450,000 2,450,000
4 Lemari Alat/ Obat Bh 2,450,000 2,450,000

PENGADAAN ALAT KESEHATAN


1 Martus Set Set 1,000,000 1,000,000
2 Nursing Set Set 400,000 400,000
3 Sirkum Set Set 400,000 400,000
4 Timbangan Dewasa Bh 300,000 300,000
5 Termometer Bh 150,000 150,000
6 Tensi Dewasa (Air Raksa) Bh 1,500,000 1,500,000
7 Tensi Anak Bh 300,000 300,000
8 Dopler Unit 1,750,000 1,750,000
9 Timbangan Bayi Unit 500,000 500,000
10 Kipas Angin Unit 750,000 750,000
11 Tempat Sampah Bh 160,000 160,000

B. DAFTAR ALAT :
1 Tali Nilon 2,5 mm @ 100 m Rol 55,000 55,000
2 Lori-Lori/Archo Bh 550,000 550,000
3 Skop Bh 115,000 115,000
4 Selang Air 5/8" @ 50 m Rol 125,000 125,000
5 Selang Timbang M' 4,000 4,000
6 Ember Cor Bh 15,000 15,000

C. DAFTAR UPAH :
1 Pekerja HOK 80,000 80,000
2 Tukang Batu/Kayu/Cat/Besi HOK 120,000 120,000

Disetujui Oleh : Dibuat Oleh :


TIM PENYUSUN RKPDes PELAKSANA KEGIATAN
Ismail Saleh.S.Kom H.BURHAN
Ketua Ketua TPK
( TPK )
N UPAH

KETERANGAN HARGA
(Rp)
8 4.00
ret
- 700,000 3 233,333 400,000 133,333
150,000.00 500,000 3 166,667 200,000 66,667
300,000.00 900,000 3 300,000
83,000.00 300,000 3 100,000
- 200,000
1,000.00
75,000.00
25,000.00 2,800 1.000
Terima dilokasi kegiatan 3,500,000.00 1.000
Terima dilokasi kegiatan 3,500,000.00 1.000
Terima dilokasi kegiatan 2,000,000.00 0.065 0.210 0.16
10,000.00 0.215 0.410 0.36
50,000.00 0.014 0.086 0.06
350,000.00 71.56 11.61 17.36
325,000.00
300,000.00
275,000.00
Termasuk biaya Pasang 800,000.00
50,000.00
Termasuk biaya Pasang 750,000.00
Termasuk biaya Pasang 325,000.00
Termasuk biaya Pasang 325,000.00
60,000.00
25,000.00
20,000.00
5,000.00
10,000.00
85,000.00
180,000.00
20,000.00
120,000.00
95,000.00
35,000.00
25,000.00
25,000.00
30,000.00
15,000.00
55,000.00
700.00
35,000.00
75,000.00
20,000.00
32,000.00
20,000.00
10,000.00
10,000.00
10,000.00
20,000.00
30,000.00
280,000.00
5,000.00
350,000.00
475,000.00
KETERANGAN HARGA
(Rp)
8 4.00

90,000.00
60,000.00
25,000.00
18,000.00
14,000.00
5,000.00
10,000.00
20,000.00
1,800,000.00
80,000.00
75,000.00
75,000.00
20,000.00

1 Paket (Inst. Bangunan+Paga 4,100,000.00

2,000,000.00
350,000.00
1,400,000.00
1,400,000.00

55,000.00
550,000.00
115,000.00
125,000.00
4,000.00
15,000.00

80,000.00
100,000.00

Lapolu ......./Januari 2020

PELAKSANA KEGIATAN
XXIII. FORMAT RENCANA ANGGARAN DAN BIAYA (RAB)

RENCANA ANGGARAN BIAYA (RAB)


Propinsi : Sulawesi Tenggara No. Rab. : I/DD-Watumea/2020
Kabupaten : Kolaka Utara Program : P3MD
Kecamatan : Tiwu Jenis Kegiatan :Pemb.Rabat Jalan Beton
Desa : Watumea Volume : 400 Meter
Lokasi : Dusun I
Harga Satuan
No. Uraian Volume Total Sat. Jumlah Total (Rp.) Jumlah (Rp.)
(Rp.)
a b c d e f g
I BAHAN BANGUNAN
1 Kerikil 41.00 M3 300,000 12,300,000 12,300,000
2 Pasir Pasang 60.00 M3 100,000 6,000,000 6,000,000
3 Semen Portland 50 Kg 169.00 Zak 75,000 12,675,000 12,675,000
Sub.Total I 30,975,000 30,975,000
II ALAT
1 Tali Nilon 2,5 mm @ 100 m 2.00 Rol 55,000 110,000 110,000
2 Lori-Lori/Archo 1.00 Bh 550,000 550,000 550,000
3 Skop 6.00 Bh 115,000 690,000 690,000
4 Selang Air 5/8" @ 50 m 1.00 Rol 125,000 125,000 125,000
5 Selang Timbang 39.00 M' 4,000 156,000 156,000
6 Ember Cor 40.00 Bh 15,000 600,000 600,000
Sub.Total II 2,231,000 2,231,000
b UPAH KERJA :
1 Pekerja 272.38 HOK 80,000 21,790,200 21,790,200
2 Tukang 93.00 HOK 120,000 11,160,000 11,160,000
3 Pengangsur Krikil 41.00 HOK 100,000 4,100,000 4,100,000
4 Pengangsur Pasir 60.00 HOK 100,000 6,000,000 6,000,000
5 Pengangsur Smen 169.00 HOK 25,000 4,225,000 4,225,000
Sub.Total III 47,275,200 47,275,200
Total Biaya Rp 80,481,200

Lapolu ......./Januari 2020


Disetujui Oleh : Disetujui Oleh :
KEPALA DESA LAPOLU TIM PENYUSUN RKPDes

A.ULFA SUCI MUH.ASIR


Ketua
:Pemb.Rabat Jalan Beton
TIM PENGELOLA KEGIATAN ( TPK )
RENCANA ANGGARAN BIAYA TOTAL (RAB)
Propinsi No. Rab. : I/DD-Watumea/2020
Kabupaten Program : P3MD
Kecamatan Jenis Kegiatan :Pemb.Rabat Jalan Beton
Desa Volume : 400 Meter
Lokasi
Volume Harga Satuan Jumlah Harga PAJAK Jumlah Total
No. Uraian Sat.
Total (Rp.) (Rp.) PPH 1.5% PPN 10 % (Rp.)
a b c d e f g h i
I BAHAN BANGUNAN
1 Kerikil 41.00 M3 300,000 12,300,000 187,310 12,487,310
2 Pasir Pasang 60.00 M3 167,000 10,020,000 152,589 10,172,589
3 Semen Portland 50 Kg 169.00 Zak 75,000 12,675,000 193,020 1,286,802 14,154,822
Sub.Total I 34,995,000 532,919 1,286,802 36,814,721
II ALAT
1 Tali Nilon 2,5 mm @ 100 m 2.00 Rol 55,000 110,000 110,000
2 Lori-Lori/Archo 1.00 Bh 550,000 550,000 550,000
3 Skop 6.00 Bh 115,000 690,000 690,000
4 Selang Air 5/8" @ 50 m 1.00 Rol 125,000 125,000 125,000
5 Selang Timbang 54.00 M' 4,000 216,000 216,000
6 Ember Cor 37.00 Bh 15,000 555,000 555,000
Sub.Total II 2,246,000 - - 2,246,000
c. UPAH KERJA :
1 Pekerja 272.38 HOK 80,000 21,790,200 21,790,200
2 Tukang 93.00 HOK 120,000 11,160,000 11,160,000
3 Pengangsur Smen 169.00 Zak 25,000 4,225,000 4,225,000
4 Pengangsur Pasir 60.00 M3 100,000 6,000,000 6,000,000
5 Pengangsur krikil 41.00 M3 100,000 4,100,000 4,100,000
Sub.Total III 47,275,200 - - 47,275,200
A Jumlah Total ( I + II + III ) 84,516,200 532,919 1,286,802 86,335,921
B Operasional TPK 5 % 4,225,101
C PPH 1,5 % 532,919
D PPN 10 % 1,286,802 RP. 90,561,022
E Total Biaya 90,561,022
Dibulatkan 90,561,022
Lapolu ......./Januari 2020
Disetujui Oleh : Disetujui Oleh : Dibuat Oleh :
KEPALA DESA LAPOLU TIM PENYUSUN RKPDes PELAKSANA KEGIATAN

A.ULFA SUCI Ismail Saleh.S.Kom H.BURHAN


Ketua Ketua TPK
1655

800 600 1400 255


4,964,000 10 1.5
451,273 67,691

PAJAK
Harga Satuan Harga Satuan PPH 1.5% PPN 10 % 110.00
(Rp.) (Rp.) 1.50 10.00 11.50
e 98.50
1.50 1.50
170,000 200,000 21,830,000 3,200,000 108.50
150,000 150,000 #REF!
70,000 69,000

3
15,847
55,000 55,000 50000
550,000 550,000 3
115,000 115,000
(34,153)
39,060,721 11 32,950,200.00
4 (46,959,800)

#REF! #REF! #REF! 3 #REF!


#REF! #REF! #REF! 5 #REF!
21,790,200
33,523 22,750,000
(959,800)
#REF! #REF!
4,109,810 317,258,100 (232,741,900) #REF!
4,528,051 (418,241) 15,889,500 (11,779,690)
4,225,810 2,917,544 (2,384,626)
13,934,895 (12,648,093)
90,561,022 350,000,039 (259,439,017)
350,000,000 259,438,978 350,000,000 (259,438,978)

7,000,000
3,500,000
32,950,200 1,655
351,000,000 105,300,000 19,909
27,168,307
20 15 15
30 30 25
600 450 375

1,104.56
925.18
1655
TIM PENGELOLA KEGIATAN ( TPK )

REKAPITULASI RENCANA ANGGARAN BIAYA

Propinsi : Sulawesi Tenggara No. Rab. : I/DD-Watumea/2020


Kabupaten : Kolaka Utara Program : P3MD
Kecamatan : Tiwu Jenis Kegiatan :Pemb.Rabat Jalan Beton
Desa : Lapolu Volume : 400 Meter
Lokasi : Dusun III

Bobot
No. URAIAN JUMLAH HARGA (RP.)
%

a b c d
I. BAHAN BANGUNAN 34,995,000 38.64
II. PERALATAN 2,246,000 2.48
V. UPAH 47,275,200 52.20
A Jumlah 84,516,200 93.33
B Operasional TPK 5 % 4,225,101 4.67
C PPH 1,5 % 532,919 0.59
D PPN 10 % 1,286,802 1.42
E Jumlah Total 90,561,022 100.02
Dibulatkan 90,561,022
Terbilang : ( Sembilan Puluh Juta Lima Ratus Enam Puluh Satu Ribu Dua Puluh DuaRupiah )
Lapolu ......./Januari 2020

Disetujui Oleh : Disetujui Oleh : Dibuat Oleh :


KEPALA DESA LAPOLU TIM PENYUSUN RKPDes PELAKSANAN KEGIATAN

A.ULFA SUCI Ismail Saleh.S.Kom H.BURHAN


Ketua Ketua TPK

Mengetahui : Diperiksa dan Disetujui Oleh:


CAMAT TIWU TENAGA PROFESIONAL

SARPIN HANEIS, S.Pd ERICK TADJUDDIN.ST


Nip. 19641107 198610 1 005 PDTI
289,203,227

389,203,227
81,732,678
189,429,400
192,546,737.00

7,266,225.00

484,415,000 Pagu
350,000,000 259,438,978 90,561,022 GOR
393,853,978 Normalisasi
66,502,600 RAB
327,351,378
BACK UP DATA PERHITUNGAN VOLUME RENCANA

Satuan Kerja : P3MD


Nama Kegiatan : Program Dana Desa

Paket Pekerjaan : Pembangunan jalan Rabat beton


Volume (P) : 400 Meter
Lokasi : Dusun III
Pelaksana Kegiatan : TPK Desa Lapolu

URAIAN PEKERJAAN : GALIAN TANAH

Sketsa/Gambar
15

100

Formula Perhitungan

Dik.
T = 0.15 m
L = 1.0 m
P = 345 m

Rumus
Volume = P X L X T

Luas 345 X 1.0 X 0.15

Volume 51.75 M3
BACK UP DATA PERHITUNGAN VOLUME RENCANA

Satuan Kerja : P3MD


Nama Kegiatan : Program Dana Desa

Paket Pekerjaan : Pembangunan jalan Rabat beton


Volume (P) : 400 Meter
Lokasi : Dusun III
Pelaksana Kegiatan : TPK Desa Lapolu

URAIAN PEKERJAAN : RABAT BETON

Sketsa/Gambar
15

100

Formula Perhitungan

Dik.
T = 0.15 m
L = 1.0 m
P = 345 m

Rumus
Volume = P X L X T

Luas 345 X 1.0 X 0.15

Volume 51.75 M3
BACK UP DATA PERHITUNGAN VOLUME RENCANA

Satuan Kerja : P3MD


Nama Kegiatan : Program Dana Desa

Paket Pekerjaan : Pembangunan jalan Rabat beton


Volume (P) : 400 Meter
Lokasi : Dusun III
Pelaksana Kegiatan : TPK Desa Lapolu

URAIAN PEKERJAAN : RABAT PASIR URUG

Sketsa/Gambar
8

100

Formula Perhitungan

Dik.
T = 0.08 m
L = 1.0 m
P = 345 m

Rumus
Volume = P X L X T

Luas 345 X 1.0 X 0.08

Volume 27.60 M3
h 105

0.8
84

289,203,227
90,561,022
1286802.03046
90,561,022

1 0 Vol. Galian Tanah


90561021.8122

2 #REF! Vol. Batu Kosong


3 - Vol. Pas. Pondasi 1 : 4
0.66 0.8
#REF! #REF!
0

0 1000
-1000

1400
-1400

Anda mungkin juga menyukai