A. Jumlah Dana yang ditransfer ke Toko/Penyedia Bahan Bangunan (Tahap I/II *)
Jumlah Harga per Unit Jumlah Harga
No Jenis Bahan Bangunan ( unit ) ( Rp ) ( Rp )
Cakar ayam 50x50 cm 0 100000 0
Besi beton 10mm 34 50,000 1,700,000
Besi beton 8 mm (Begel) 31 36,000 1,116,000
Semen holcim 40 kg 2300 1,360 3,127,600
Pasir Beton 1.4 250,000 350,000
Batu pecah (Kricak) 1.9 320,000 608,000
Pasir pasang 5.24 180,000 944,000
Bata merah 3254 650 2,115,100
Genteng bubungan 22 400 8,800
Kusen & Daun Pintu Type I, Uk (90x210) cm 2 550,000 1,100,000
Kusen & Daun Jendela Kaca, Uk (60x120) cm 3 350,000 1,050,000
Loaster kayu 6 10,000 60,000
Kayu 6/12panjang 4 m gording 12 46000 552,000
Kayu 8/12 panjang 4 m kuda kuda 10 80000 800,000
Kayu 4/6 panjang 4 m kaso 25 20000 500,000
Kayu 2/3 panjang 4 m reng 117.333333333 7500 880,000
Genteng plentong 575 1500 862,500
paku 1.2 17000 20,000
kawat beton 2 20,000 40,000
TOTAL HARGA PEMBELIAN 15,834,000
SURVEY TOKO/PENYEDIA BAHAN BANGUNAN
Nama KPB :
Desa / Kelurahan : …………………………
Kecamatan : ………………………..
Kabupaten / Kota : ………………………..
Tanggal Survei : ………………………..
Tanggal dibuat Laporan : ………………………..
( …………………………………………... ) (……………………………………
Disahkan oleh,
Tim Teknis Kab./Kota
(…………………………………………………………)
NIP……………………………………………………..
um Pemerintah
Keterangan
Nama Bank & Nomor
Rekening untuk
Kegiatan BSPS
Perwakilan KPB,
Ketua
(………………………………………)
Kota : Surakarta
Kecamatan : Take Of Sheet
Desa :
Luas = 7 x 4.5 x 2
p 6
= 6.48 M3 L 6
K 24
= 3.84 M3
= 1.92 M3
= 1.08 M3
= 0.608 M3
3.78
1.62
5.4
96.6 = 96.6 M2
= 193.2 M3
= 63 M2
= 56.00 m
= 7.00 m
pekerjaan goording
jumlah gording : 5
Dibuat oleh :
DAFTAR ANALISA PEKERJAA
KOEFISIEN
NO URAIAN PEKERJAAN SATUAN
/INDEKS
1 2 3 4
1 1 M3 PEK PAS BATU BELAH 1 : 6
Batu Belah 15/20 Hitam M3 1.2
Sement/PC 50 kg kg 136
Pasir Pasang M3 0.544
15 Pek. Kusen
Kusen & Daun Pintu Type I, Uk (90x210) cm Buah 1
Kusen & Daun Jendela Kayu, Uk (60x90) cm Buah 1
loaster kayu Buah 1
ISA PEKERJAAN
Nama PB :
Nama KPB :
Nomer BNBA :
TOTAL
HARGA JUMLAH HARGA BOBOT
VOLUME VOLUME
SATUAN (Rp) %
KEBUTUHAN
5 6 7=4x6 8=5x7 9
6.48
200,000 6.48 8.00 1,600,000
1,360 6.48 882.00 1,199,520
180,000 6.48 4.00 720,000
3.84
200,000 3.84 4.61 921,600
1.92
100,000 1.92 0.43 43,200
1.08
1,360 1.08 353.00 480,080
250,000 1.08 0.60 150,000
250,000 1.08 0.90 225,000
0.61
1,360 0.61 199.00 270,640
250,000 0.61 0.40 100,000
250,000 0.61 0.50 125,000
0.65
1,360 0.65 212.00 288,320
250,000 0.65 0.40 100,000
250,000 0.65 0.50 125,000
193.20
1,360 193.20 1,336.00 1,816,960
180,000 193.20 6.80 1,224,000
96.60
650 96.60 6,762.00 4,395,300 6,762.00
1,360 96.60 935.00 1,271,600
180,000 96.60 4.00 720,000
63.00
1,500 63.00 1,575.00 2,362,500
400 22.00 22.00 8,800
-
69,000 - - -
27,089,520
8.3
1.44
48611.11
RENCANA ANGGARAN BIAYA (RAB) BSPS
Nomor BNBA :
Nomor KTP :
Nama Penerima Bantuan :
Alamat :
Desa / Kelurahan :
Kecamatan :
Kabupaten / Kota :
Jenis Kegiatan :
SUMBER DANA/BAHAN
HARGA SWADAYA
No. URAIAN PEKERJAAN VOLUME SATUAN TOTAL HARGA
(Rp) (Rp) vol BSPS BSPS Dana Memakai Bahan
Tunai Bangunan Lama
I Pekerjaan Persiapan
Bongkar Rumah Lama 1 ls 500,000 500,000 - - 500,000
II Pekerjaan Pondasi - -
1 Pasangan Pondasi Batu Kali - -
Semen/PC 50 kg 882 kg 1,360 1,199,520 - 1,199,520
Pasir Pasang 4.0 m³ 180,000 720,000 - 720,000
Batu Belah 15/20 Hitam 8.00 m³ 200,000 1,600,000 - 1,600,000
Batu Kosong 4.6 m³ 200,000 921,600 - 921,600
Pasir Urug 0.43 m³ 100,000 43,200 - 43,200
A. Jumlah Dana yang ditransfer ke Toko/Penyedia Bahan Bangunan (Tahap I/II *)
Jumlah Harga per Unit Jumlah Harga
No Jenis Bahan Bangunan ( unit ) ( Rp ) ( Rp )
1 bondex 0.7mmx1m ,panjang 4 m 0 150000 0
Cakar ayam 50x50 cm 0 100000 0
Batu belah 0 300000 -
Besi beton 10mm 34 50,000 1,700,000
Besi beton 8 mm (Begel) 31 36,000 1,116,000
Semen holcim 40 kg 2300 1,360 3,127,600
Pasir Beton 1.4 250,000 350,000
Batu pecah (Kricak) 1.9 250,000 475,000
Pasir pasang 5.24 180,000 944,000
Bata merah 1000 650 650,000
Batako 0 100,000 -
Genteng bubungan 22 400 8,800
Kusen & Daun Pintu Type I, Uk (90x210) cm 2 550,000 1,100,000
Kusen & Daun Jendela Kayu, Uk (60x120) cm 0 550,000 -
Kusen & Daun Jendela Kaca, Uk (60x120) cm 3 350,000 1,050,000
pintu kamar mandi PVC 0 250,000 -
Loaster kayu 6 10,000 60,000
Kayu 6/12 panjang 4 m kuda kuda 0 46000 -
Kayu 6/12panjang 4 m gording 12 46000 552,000
Kayu 8/12 panjang 4 m kuda kuda 10 80000 800,000
Kayu 4/6 panjang 4 m kaso 25 20000 500,000
Kayu 2/3 panjang 4 m reng 117.333333333 7500 880,000
Papan bekisting 0 25000 -
Kaso bekisting 0 40000 -
talang galvalum 90 cm 0 40000 -
Genteng plentong 575 1500 862,500
GALVALUM 0 36000 -
Baja Kanal C75x45x15x1.8 2.00 75000 150,000
Seng gelombang 0 69000 -
Septic Tank/Buis Beton 0 80000 -
Closet Jongkok 0 150000 -
Pipa Air Kotor, Ukuran…… 1 130000 130,000
paku 7.3 17000 123,400
kawat beton 2 20,000 40,000
TOTAL HARGA PEMBELIAN 14,619,300
DAFTAR RENCANA PEMANFAATAN BANTUAN (DRPB) I
A. Jumlah Dana yang ditransfer ke Toko/Penyedia Bahan Bangunan (Tahap I/II *)
Jumlah Harga per Unit Jumlah Harga
No Jenis Bahan Bangunan ( unit ) ( Rp ) ( Rp )
1 Cakar ayam 50x50 cm 0 100000 0
2 Besi beton 10mm 34 50000 1700000
3 Besi beton 8 mm 31 36000 1116000
4 Semen holcim 40 kg 2299.70588235 1360 3127600
5 Pasir Beton 1.4 250000 350000
6 Batu pecah 1.9 250000 475000
7 Pasir pasang 5.24444444444 180000 944000
8 Bata merah 1000 650 650000
9 Kayu 4/6 panjang 4 m kaso 41 20000 820000
10 Kayu 2/3 panjang 4 m reng 70 7500 525000
11 talang galvalum 90 cm 0 40000 0
12 Genteng plentong 500 1500 750000
13 GALVALUM 0 36000 0
14 Baja Kanal C75x45x15x1.8 2 75000 150000
15 Pipa Air Kotor, Ukuran…… 1 130000 130000
16 paku 7.26 17000 117200
17 kawat beton 2 20000 40000
TOTAL HARGA PEMBELIAN 11,754,800
Terbilang : Delapan Juta Tujuh ratus Lima Puluh ribu Rupiah
Disanggupi oleh:
Nama Toko/Penyedia Bahan Bangunan : UD SONGKRO
Alamat Toko/Penyedia Bahan Bangunan : MINAPADI 4 RW 9
Nomor Rekening Bank Toko/Penyedia BB : 0103901500006067
(………………………………)
B. Jumlah dana yang ditarik tunai untuk upah kerja (Tahap I/II *)
No Uraian Jumlah Harga (Rp)
1 Upah Kerja PKRS/PBRS *) -
TOTAL TARIK TUNAI (B) -
Terbilang : Satu juta duaratus limapuluh ribu rupiah
(………………………………)
Disahkan oleh: Diverifikasi oleh: Difasilitasi oleh:
Tim Teknis Kab/Kota Koordinator Fasilitator Tenaga Fasilitator Lapangan
Kabupaten/Kota
A. Jumlah Dana yang ditransfer ke Toko/Penyedia Bahan Bangunan (Tahap I/II *)
Jumlah Harga per Unit Jumlah Harga
No Jenis Bahan Bangunan ( unit ) ( Rp ) ( Rp )
1 Genteng bubungan 22 400 8,800
2 Kusen & Daun Pintu Type I, Uk (90x210) cm 2 550,000 1,100,000
3 Kusen & Daun Jendela Kaca, Uk (60x120) cm 3 350,000 1,050,000
4 pintu kamar mandi PVC 0 250,000 -
5 Kayu 6/12panjang 4 m gording 12 46000 552,000
6 Kayu 4/6 panjang 3 m kaso -16 20000 (320,000)
7 Kayu 2/3 panjang 2 m reng 47.3333333333 7500 355,000
8 Genteng plentong 75 1500 112,500
9 paku 0.36 17000 6,200
TOTAL HARGA PEMBELIAN 2,864,500
Terbilang : Enam Juta Dua Ratus Lima Puluh Ribu -
Disanggupi oleh: -
Nama Toko/Penyedia Bahan Bangunan : …………………………………
Alamat Toko/Penyedia Bahan Bangunan : …………………………………
Nomor Rekening Bank Toko/Penyedia BB : …………………………………
(………………………………)
B. Jumlah dana yang ditarik tunai untuk upah kerja (Tahap I/II *)
No Uraian Jumlah Harga (Rp)
1 Upah Kerja PKRS/PBRS *) 2,500,000
TOTAL TARIK TUNAI (B) 2,500,000
Terbilang : dua juta lima ratus ribu rupiah
(………………………………)