600
Cb = xd
600 + fy
128
600
= x 460 = 276 mm
600 + 400
Cbmaks = 0,75 . Cb
= 0,75 x 276 = 207 mm
Abmaks = β1 . Cbmaks`
= 0,85 X 207 = 176 mm
Ccb = 0,85 . Ab . B . f’c
= 0,85 x 176 x 350 x 20,75
= 1086161,344 N
ab
Mnb = Ccb . (d − )
2
176
= 1086161,344 x ( 460 - )
2
= 404079174 Nmm
= 404,079 kNm
Mr = Ø . Mnb
= 0,8 x 404,079
= 323,26 kNm
Mr > Mu
323,26 > 151,902 OK
(Cukup Tulangan Tunggal)
129
400
=
0,85 x 20,75
= 22,679
1 2 x 22,679 x 2,563
=
22,679 √
( 1 - 1-
400
= 0,007
130
As ≥ As perlu
1607,7 ≥ 1120,347 mm² (memenuhi syarat)
600
Cb = ×d
600+fy
600
= × 460 = 276 mm
600 + 400
Cbmaks = 0,75 x Cb
= 0,75 x 276 = 207 mm
Ab = β1 x Cbmaks
= 0,85 x 207 = 176 mm
Ccb = 0,85 x Ab x B x f’c
= 0,85 x 176 x 350 x 20,75
= 1086161,344 N
131
ab
Mnb = Ccb x (d - )
2
156,83
= 1086161,344 x 410 –
2
= 404078174 Nmm
= 404,079 kNm
Mro = Ø x Mnb
= 0,8 x 404,079
= 323,26 kNm
323,26 kNm > 75,951 OK
(Cukup Tulangan Tunggal)
132
1,4
ρmin =
fy
1,4
=
400
= 0,0035
ρmax = 0,75 x ρb
= 0,75 x 0,6441
= 0,48
1 2 x m x Rn
ρperlu =
m √
(1- 1-
fy
)
1 2 x 22,679 x 1,2819
=
22,67895
(1- 1-
√
400
= 0,0033
133
= 118 mm > 25 mm OK
Tulangan Tarik
Øsengkan
g Øtul-1 Jml tul-1 ds
mm mm bh mm
10 16 8 40
Tulangan Tekan
Øsengkan
g Øtul-1 Jml tul-1 ds
mm mm bh mm
10 16 4 40
Geometri Balok
b h p d
mm mm mm mm
350 500 40 460
ds d' As As'
mm mm mm mm
40 40 1607,68 803,84
Ts = As x Fy
Cc = Ts
0,85 x fc’ x a x b = Ts
0,85 x fc’ x a x b = 643072
a = 104,1728 mm
134
a
c = = 122,56 mm
β₁
b. Tulangan Tarik
d−c
εs = c x 0,003
460 - 122,56
= 122,56 x 0,003
= 0,00826 LELEH
fy
εy = εs
400
= 200000
= 0,002
Karena sesuai anggapan dapat dilajutkan dengan a
a < amaks
104,17 < 175,95
Penulangan Liat / Daktail
135
= 0,85 x 104,17 x 350 x 20,75
= 643072 N
Cs = As’ . Fy
= 321536 N
136
B. Penulangan Daerah Lapangan
Data Perencanaan :
Fy = 400 mpa
Mu- = 39,671 kNm
Mu+ = 103,251 kNm
2. Perencanaan Tulangan Lentur
b. Menentukan tulangan Lapangan
3) Momen tumpuan positif
Mu- = 103,251 kNm
c) Kuat maksimum penampang tulangan tunggal
Tabel 6.4 Penulangan Tunggal
P Øsengkang Øtul-1 Jml tul-1 As ds d
mm mm mm bh mm² mm mm
160
10
40 16 8 8 40 410
600
Cb = xd
600 + fy
600
= x 460 = 276 mm
600 + 400
Cbmaks = 0,75 . Cb
= 0,75 x 276 = 207 mm
Abmaks = β1 . Cbmaks`
= 0,85 X 207 = 176 mm
Ccb = 0,85 . Ab . B . f’c
= 0,85 x 176 x 350 x 20,75
= 1086161,344 N
ab
Mnb = Ccb . (d − )
2
176
= 1086161,344 x ( 460 - )
2
= 404079174 Nmm
137
= 404,079 kNm
Mr = Ø . Mnb
= 0,8 x 404,079
= 323,26 kNm
Mr > Mu
323,26 > 103,251 OK
(Cukup Tulangan Tunggal)
138
= 0,75 x 0,6441 = 0,48
1 2 x m x Rn
ρperlu =
m √
( 1 - 1-
fy
)
1 2 x 22,679 x 1,74269
=
22,679 √
( 1 - 1-
400
= 0,005
139
Tabel 6.5 Penulangan Tunggal
Jml
P Øsengkang Øtul-1 tul-1 As ds d
mm mm mm bh mm² mm mm
40 10 16 4 803,8 40 460
600
Cb = ×d
600+fy
600
= × 460 = 276 mm
600 + 400
Cbmaks = 0,75 x Cb
= 0,75 x 276 = 207 mm
Ab = β1 x Cbmaks
= 0,85 x 207 = 176 mm
Ccb = 0,85 x Ab x B x f’c
= 0,85 x 176 x 350 x 20,75
= 1086161,344 N
ab
Mnb = Ccb x (d - )
2
156,83
= 1086161,344 x 410 –
2
= 404078174 Nmm
= 404,079 kNm
Mro = Ø x Mnb
= 0,8 x 404,079
= 323,26 kNm
323,26 kNm > 39,671 OK
(Cukup Tulangan Tunggal)
140
Mu
Rn =
∅ x b x d2
39671 000
=
0,8 x 350 x 211600
= 0,67
fy
m =
0,85 x f'c
400
=
0,85 x 20,75
= 22,679
0,85 x f'c 600
ρb = x β1 x
fy 600 x fy
0,85 x 20,75 600
= x 0,85 x
400 600+400
= 0,044094 x 0,6
= 0,6441
1,4
ρmin =
fy
1,4
=
400
= 0,0035
ρmax = 0,75 x ρb
= 0,75 x 0,6441
= 0,48
1 2 x m x Rn
ρperlu =
m √
(1- 1-
fy
)
1 2 x 22,679 x 0,67
=
22,67895
(1- 1-
√400
= 0,0022
141
As perlu = ρmin x b x d
= 0,0035 mm2 x 350 x 460
= 563,5 mm2
563,5
Kebutuhan Tulangan =
200,96
= 2,804 ~ 4
Dipilih susunan tulangan As
As ≥ Asperlu
803,8 ≥ 563,5 mm² (memenuhi syarat)
Tulangan Tekan
Øsengkan
g Øtul-1 Jml tul-1 ds
mm mm bh mm
10 16 4 40
142
Geometri Balok
b h p d
mm mm mm mm
350 500 40 460
ds d' As As'
mm mm mm mm
40 40 1607,68 803,84
Ts = As x Fy
Cc = Ts
0,85 x fc’ x a x b = Ts
0,85 x fc’ x a x b = 643072
a = 104,1728 mm
a
c = = 122,56 mm
β₁
Kontrol ulang regangan:
c. Tulangan Tekan
c−ds
ε’ = c
x 0,003
122,56 - 40
= 122,56 x 0,003 = 0,002021 LELEH
d. Tulangan Tarik
d−c
εs = c x 0,003
460 - 122,56
= 122,56 x 0,003
= 0,00826 LELEH
fy
εy = εs
143
400
= 200000
= 0,002
Karena sesuai anggapan dapat dilajutkan dengan a
a < amaks
104,17 < 175,95
Penulangan Liat / Daktail
144
Tulangan bawah = 8D16
145
Perencanaan Tulangan Geser
Diketahui :
F’c = 20,75
Bw = 350
D = 460
Tul.Sengkang (D)= 10
Fy = 240
146
SNI 03-2847-2013 Pasal 11.1.1
183
Vn = 𝑉𝑢/ø = = 245
0,75
Cek Dimensi Penampang
√f ' c.bw.d √20,75' .3 50.460
Vc = = =
6 6
122232 N
= 122,232kN
147
Hitung Jarak Sengkang (s)
SNI 03-2847-2013 Pasal 11.4.7.2
Daerah I
Av.fy.d Av.fy.d 17332800
Vs =
s
→ s = Vs =
122276,35
= 141,8 mm
= 100 mm
Daerah II
b. s 3.Av.fy 113040
Avmin =
3.fy
→s=b =
300
= 376,8 mm
= 200 mm
Analisa Tulangan Geser
Kemampuan geser lentur tulangan sengkang (Vs)
Av.fy.d 17332800
Vs = = = 173328 N
s 100
s = 100 >/ d/4 = 115 tetapi < 151,8
s = 200 <= d/2 = 230 tetapi < 323
Vs = 173,328 > Vs = 122,27635 OKE
SNI 03-2847-2013 Pasal 11.4.7.2
148
Perencanaan Tulangan Torsi
Acp²
Tu > Ø x 0,083 λ√fc' x
Pcp
30625000000
Tu > 0,75 x 0,083 x 1√20,75
1700
14157333 > 6142245 Nmm perlu tulangan torsi
149
Tulangan sengkang terhadap torsi
Sesuai dengan SNI 03-2847-2013 pasal 11.5.3.6
tulangan sengkang untuk torsi harus direncakan dengan rumus :
Aoh = (b - ds - dsengkang) x (h - ds - d sengkang)
= 135000 mm²
Ao = 0,85 x Aoh
= 114750 mm²
Begel Torsi :
Luas begel Torsi,
Avt Tn
=
s 2.Ao.fy.cotϴ
Avt 14157333
= = 0,257 mm
s 2114750 x 240 x cot 45
150
0,35 bw.S
Avs + Avt >
fyt
122.500
1827,032 > = 510,4166 mm²
240
Jadi , 1827,032 >1876,145833 > 510,4166 OK
Jarak Begel Total,
n. 1/4 . 3,14. dp2 S 157000
s = =
Avs + Avt 1827,032
= 85,9317 mm
151
At + Ast = 2517,931 mm²
At/s tidak boleh diambil kurang dari SNI 2847 2013 Pasal 11.5.5.3
0,175bw 0,175x350
= = 0,255 mm
Fyt 400
Avt
s = 0,257032 mm
Jadi,
0,175bw Avt
<
Fyt s
0,255 < 0,257032 MEMENUHI SYARAT
Al min menurut SNI 2847 Pasal 11.5.5.3
Perhitungan Kuat Tekan Beton terhadap Gaya Puntir Arah Horizontal kekuatan torsi
yang disediakan oleh beton non prategang dhitung sesuai dengan persamaan pada
pasal 11.2.1.1 sebagai berikut
Vc = 0,17 . λ. √f'c . b . D
Vc = 0,17 x 1 √ 20,75 x 350 x 500
152
= 135517,70 N
Setelah diketahui kemampuannya, perlu di cek kembali keamanan terhadap beban
geser dan torsi menggunakan persamaan yang ada pada Pasal 11.5.3.1 (a) sebagai
berikut :
2 2
√( Vu
bw x d ) (
+
Tu x Ph
1,7 x Aoh2 ) ≤Ø ( Vc
bw x h
+ 0,66 √ fc ')
2 2
√( 183,281
350 x 460 ) ( +
10,618 x 690
1,7 x 1350002 ) ≤ 0,75 (135517,69
350 x 500
+ 0,66 √20,75 )
3,36 x 1010 9,54 x 1019
√ +
2,59 x 1010 9,6 x 1020
≤ 2,836
153
Standart untuk detail
a. Penentuan Lokasi Pemutusan Tulangan Lentur
Pada Sni beton 2013 disebutkan “Tulangan harus menerus melampaui titik
dimana tulangan tersebut tidak diperlukan lagi untuk menahan lentur
untuk jarak 12db, kecuali pada tumpuan bentang sederhana dan pada
ujung bebas kantilever.” Sehingga panjang penyaluran untuk pemutusan
pada tulangan lentur adalah 12db = 12.19 = 228 mm = 0,228 m
b. Penentuan panjang Kait tulangan balok
Penggunaan kait yang digunakan adalah kait standart dengan
bengkokan 90 derajat ditambah perpanjangan 12db pada ujung bebas
batang tulangan (sni beton 2013).
154
Tabel 6.8 Tabel Spesifikasi Balok B1
Tumpuan Lapangan
Dimensi 350 x 500 350 x 500
Tulangan Atas 8D16 4D16
Tulangan Bawah 4D16 8D16
Sengkang D10 – 100 D10 – 200
Selimut 40 40
155
Tulangan Geser Torsi Keterangan
Tul Atas 8D16 penulangan liat/ daktail
Tumpuan D10 - 100
Tul Bawah 4D16 penulangan liat/ daktail
B1 350 x 500 Lapanga Tul Atas 4D16 4D10 penulangan liat/ daktail
D10 - 200
n Tul Bawah 8D16 penulangan liat/ daktail
Tul Atas 8D16 penulangan liat/ daktail
Tumpuan D10 - 100
Tul Bawah 4D16 penulangan liat/ daktail
B2 350 x 500 Lapanga Tul Atas 4D16 4D10 penulangan liat/ daktail
D10 - 200
n Tul Bawah 8D16 penulangan liat/ daktail
Tul Atas 8D16 penulangan liat/ daktail
Tumpuan D10 - 100
Tul Bawah 4D16 penulangan liat/ daktail
B3 350 x 500 Lapanga Tul Atas 4D16 4D10 penulangan liat/ daktail
D10 - 200
n Tul Bawah 8D16 penulangan liat/ daktail
Tul Atas 8D16 penulangan liat/ daktail
Tumpuan D10 - 100
Tul Bawah 4D16 penulangan liat/ daktail
B4 350 x 500 Lapanga 4D10
Tul Atas 4D16 penulangan liat/ daktail
D10 - 200
n Tul Bawah 8D16 penulangan liat/ daktail
Tul Atas 8D16 penulangan liat/ daktail
Tumpuan D10 - 50
Tul Bawah 4D16 penulangan liat/ daktail
B5 400 x 500 Lapanga Tul Atas 4D16 4D10 penulangan liat/ daktail
D10 - 100
n Tul Bawah 8D16 penulangan liat/ daktail
Tul Atas 8D16 penulangan liat/ daktail
Tumpuan D10 - 100
Tul Bawah 4D16 penulangan liat/ daktail
B6 350 x 500 Lapanga 4D10
Tul Atas 4D16 penulangan liat/ daktail
D10 - 200
n Tul Bawah 8D16 penulangan liat/ daktail
B9 300 x 400 Tumpuan Tul Atas 10D13 D8 - 100 - penulangan liat/ daktail
156
Tul Bawah 2D13 penulangan liat/ daktail
157