NO U R A I A N KODE KOEF
I. ASUMSI
1. Jam kerja efektif per hari Tk 14.00
2. Faktor pengembangan tanah Fk 1.00
3. Jarak angkut L 0.50
4. Tahapan kerja.
a. Excavator melakukan chipping, kemudian
dimuat kedalam dump truck.
. b. Dump truck mengangkut material tanah ke lokasi
TPA.
II. ALAT
a. Excavator Standard
Kapasitas Bucket V 1.00
Faktor Bucket Fb 0.80
Faktor Efisiensi Alat Fa 0.70
b. Dump Truck
Kapasits Bak V 4.00
Faktor Efisiensi Alat Fa 0.75
Kecepatan rata-rata bermuatan v.1 20.00
Kecepatan rata-rata kosong v.2 30.00
III. TENAGA
Produksi yang menentukan : Excavator Q.1 11.20
Produksi / hari = Tk x Q.1 Q.1' 156.80
Kebutuhan tenaga
- Pekerja P 2.00
- Mandor M 0.20
Koefisien Tenaga / m3
- Pekerja : ( Tk x P ) : Q.1' 0.1786
- Mandor : ( Tk x M ) : Q.1' 0.0179
1 2 3 4
A Tenaga Kerja
1 Pekerja L.01 jam
2 Mandor L.04 jam
Jumlah Harg
B Bahan
Juml
C Peralatan
1 Biaya Operasi Exavator (Standard) jam
Jumlah
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E Overhead + Profit (Contoh 15%)
F Harga Satuan Pekerjaan per - m3 (D+E)
SATUAN KETERANGAN JENIS ALAT : Excavator, Dum
ad SATUAN PEMBAYARAN : Rupiah/jam
jam No.
km
A. 1.
2.
3.
4.
5.
6.
7.
m3 B.
Pemuatan sedang 1.
Baik
Menit
Menit 3.
Menit
Menit
m3/jam
jam
C.
1.
m3
Baik 2.
Km/jam
Km/jam 3.
Menit 4.
Menit
Menit
Menit 5.
Menit 6.
Menit
m3/jam
D.
jam
E.
1.
m3/jam 2.
m3/hari 3.
orang
orang
jam
jam
Jumlah
Koefisien Harga Satuan (Rp)
(Rp)
5 6 7
-
-
Jumlah Harga Tenaga Kerja -
URAIAN PERALATAN
Jenis Peralatan
Merk / Tipe -
Tenaga Pw HP
Kapasitas Cp -
Umur Ekonomis A Tahun
Jam Operasi Dalam 1 Tahun W Jam
Harga Alat B Rp
LAIN - LAIN
Bahan Bakar Premium (non subsidi) Mb Liter
Bahan Bakar Solar (non subsidi) Ms Liter
Minyak Pelumas Mp Liter
ANALISIS BIAYA OPERASI ALAT BERAT
Vibro dan Water Tanker
Excavator
Dump Truck Bulldozer Roller Vibro Water Tank Truck
(Standard)
80-140 HP 3-4 M3 100-150 HP 5-8 Ton 3000-4500 L
133.0 100.0 150.0 82.0 100.0
1.0 4.0 - 7.1 4,000.0
5.0 5.0 5.0 5.0 5.0
2,000 2,000 2,000 2,000 2,000
1,400,000,000 400,000,000 1,500,000,000 600,000,000 250,000,000
KETERANGAN
140,000,000
Suku bunga
0.26380 i = 10%
166,192.41
Asuransi
1,400.00 p = 0.2%
167,592.41
97,500.00 ###
43,750.00 ###
87,500.00 ###
18,071.43
12,571.43
395,112.86
562,705.27
7,200.00
8,700.00
30,000.00
B.17.a Reinforcemnet (for 1 m3 concrete)
No Uraian Kode Satuan Koefisien
A TENAGA KERJA
1 Pekerja L.01 OH 0.7000
2 Tukang besi L.02 OH 0.7000
3 Kepala Tukang L.03 OH 0.0700
4 Mandor L.04 OH 0.0700
JUMLAH TENAGA KERJA
B BAHAN
1 Besi beton M,55.d kg 105
2 Kawat M.67 kg 1.5
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead 15%
F Harga Satuan Pekerjaan (D+E)
A TENAGA KERJA
1 Pekerja L.01 OH 1.3230
2 Tukang batu L.02 OH 0.1890
3 Kepala Tukang L.03 OH 0.0190
4 Mandor L.04 OH 0.1320
JUMLAH TENAGA KERJA
B BAHAN
1 Portland Cement M.15 kg 371
2 Pasir beton M14,a kg 698
3 Kerikil M,12 kg 1047
4 Air M,02 liter 215
JUMLAH HARGA BAHAN
C PERALATAN
Molen E.29.b Sewa-hari 0.2500
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead 15%
F Harga Satuan Pekerjaan (D+E)
B.01.c 1 m3 Lean Concrete
No Uraian Kode Satuan Koefisien
A TENAGA KERJA
1 Pekerja L.01 OH 1.3200
2 Tukang batu L.02 OH 0.2200
3 Kepala tukang batu L.03 OH 0.0220
4 Mandor L.04 OH 0.1320
JUMLAH TENAGA KERJA
B BAHAN
PC M15 kg 220.0000
Pasir beton M14 m3 0.5880
Kerikil M12 m3 0.7550
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead 15%
F Harga Satuan Pekerjaan (D+E)
A TENAGA KERJA
1 Pekerja L.01 OH 0.2400
2 Tukang kayu L.02 OH 0.1200
3 Kepala Tukang L.03 OH 0.0120
4 Mandor L.04 OH 0.0240
JUMLAH TENAGA KERJA
B BAHAN
1 Multiplex 12 mm M.39.c Lembar 0.203
2 Kaso 5/7 m3 0.070
3 Paku M.64.a kg 0.300
4 Minyak bekisting M.129 liter 0.200
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead 15%
F Harga Satuan Pekerjaan (D+E)
SNI 1 m3 Wet Stone Masonry 1 : 4
No Uraian Kode Satuan Koefisien
A TENAGA KERJA
1 Pekerja L.01 OH 1.5000
2 Tukang kayu L.02 OH 0.6000
3 Kepala Tukang L.03 OH 0.0600
4 Mandor L.04 OH 0.0750
JUMLAH TENAGA KERJA
B BAHAN
1 Batu kali m3 1.200
2 PC kg 202.000
3 Pasir kg 0.485
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead 15%
F Harga Satuan Pekerjaan (D+E)
A TENAGA KERJA
1 Pekerja L.01 OH 0.1000
4 Mandor L.04 OH 0.0100
JUMLAH TENAGA KERJA
B BAHAN
1 Gebalan Rumput m2 1.100
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead 15%
F Harga Satuan Pekerjaan (D+E)
Jumlah Harga
Harga Satuan (Rp.)
(Rp.)
110,000 77,000.00
132,000 92,400.00
143,000 10,010.00
132,000 9,240.00
188,650.00
13,500 1,417,500.00
27,800 41,700.00
1,459,200.00
1,647,850.00
247,177.50
- 1,895,027.00
Jumlah Harga
Harga Satuan (Rp.)
(Rp.)
110,000 145,530.00
132,000 24,948.00
143,000 2,717.00
132,000 17,424.00
190,619.00
3,530.88 1,309,954.63
82.50 57,585.00 2200 181,500
85.76 89,786.44
25.00 5,375.00
1,462,701.06
400,000 100,000.00
100,000.00
1,753,320.06
262,998.01
- 2,016,318.00
Jumlah Harga
Harga Satuan (Rp.)
(Rp.)
98,000 129,360.00
110,000 24,200.00
115,000 2,530.00
125,000 16,500.00
172,590.00
1,800 396,000.00
141,235.00 83,046.18
190,000 143,450.00
622,496.18
795,086.18
119,262.93
- 914,349.00
Jumlah Harga
Harga Satuan (Rp.)
(Rp.)
110,000 26,400.00
132,000 15,840.00
143,000 1,716.00
132,000 3,168.00
47,124.00
205,674 41,751.82
3,800,000 266,000.00
21,600 6,480.00
25,000 5,000.00
319,231.82
366,355.82
54,953.37
- 421,309.00
Jumlah Harga
Harga Satuan (Rp.)
(Rp.)
110,000 165,000.00
132,000 79,200.00
143,000 8,580.00
132,000 9,900.00
262,680.00
333,500 400,200.00
1,800 363,600.00
83 40.01
763,840.01
1,026,520.01
153,978.00
- 1,180,498.00
Jumlah Harga
Harga Satuan (Rp.)
(Rp.)
110,000 11,000.00
132,000 1,320.00
12,320.00
18,000 19,800.00
19,800.00
32,120.00
4,818.00
- 36,938.00
ONSHORE LAND PREPARATION STUDY, NGRR LOCATION PLAN FOR KUA
REGENCY - SUMATERA UTRA PROVINCE
I Land Clearing
1.1 Demolition of Palm Oil Tree
1.1.1 Dusun I Kuala Tanjung m3 4,742.830
1.1.2 Dusun I Kuala Indah m3 13,963.601
3
1.1.3 Dusun II Kuala Indah m 11,593.612
3
1.1.4 Dusun IV Kuala Indah m 23,885.916
1.1.5 Dusun VI Suka Ramai m3 22,402.602
1.1.6 Dusun VII Suka Ramai m3 14,974.609
3
1.1.7 Desa Tanjung Harapan m 27,855.117
3
1.1.8 Desa Aras m 29,360.781
1.1.9 Desa Pematang Kruing m3 10,602.096
3
1.1.10 Desa Gambus Laut m 24,776.174
Total Harga Pekerjaan Pemotongan Kelapa Sawit
1.2 Disposal of Oil Palm Tree
Untuk pengangkutan sampah sawit sudah dihitung pada pengangkutan Stripping Top Soil
1.2.1 Dusun I Kuala Tanjung m3 4,742.830
1.2.2 Dusun I Kuala Indah m3 13,963.601
1.2.3 Dusun II Kuala Indah m3 11,593.612
1.2.4 Dusun IV Kuala Indah m3 23,885.916
1.2.5 Dusun VI Suka Ramai m3 22,402.602
1.2.6 Dusun VII Suka Ramai m3 14,974.609
1.2.7 Desa Tanjung Harapan m3 27,855.117
1.2.8 Desa Aras m3 29,360.781
1.2.9 Desa Pematang Kruing m3 10,602.096
1.2.10 Desa Gambus Laut m3 24,776.174
1.3 Stripping /Cutting Top Soil
A Pekerjaan Galian Tanah Top Soil
1.3.1 Dusun I Kuala Tanjung
1. KT-D1-01 m3 243,516.000
2. KT-D1-02 m3 686,618.690
1.3.2 Dusun I Kuala Indah
1. KI-D1-01 m3 170,639.4
2. KI-D1-02 m3 176,887.6
3 KI-D1-03 m3 58,060.3
4. KI-D1-04 m3 198,972.8
5. KI-D1-05 m3 349,772.6
1.3.3 Dusun II Kuala Indah
1. KI-D2-01 m3 606,547.065
2. KI-D2-02 m3 314,680.349
3. KI-D2-03 m3 153,509.082
1.3.4 Dusun IV Kuala Indah
1. KI-D4-01 m3 729,943.215
2. KI-D4-02 m3 36,925.405
3 KI-D4-03 m3 23,455.150
4. KI-D4-04 m3 84,883.472
5. KI-D4-05 m3 199,192.163
6. KI-D4-06 m3 307,136.377
7. KI-D4-07 m3 740,366.799
8. KI-D4-08 m3 301,115.874
9. KI-D4-09 m3 234,569.742
10. KI-D4-10 m3 135,091.521
11. KI-D4-11 m3 39,091.097
12. KI-D4-12 m3 40,823.605
13. KI-D4-13 m3 78,434.100
14. KI-D4-14 m3 187,637.668
15. KI-D4-15 m3 583,977.480
16. KI-D4-16 m3 152,261.655
1.3.5 Dusun VI Suka Ramai
1. SR-D6-01 m3 843,116.262
2. SR-D6-02 m3 353,860.230
3 SR-D6-03 m3 521,218.130
1.3.6 Dusun VII Suka Ramai
1. SR-D7-01 m3 23,130.645
2. SR-D7-02 m3 79,506.467
3 SR-D7-03 m3 56,672.549
4. SR-D7-04 m3 90,129.001
5. SR-D7-05 m3 65,575.506
6. SR-D7-06 m3 67,324.669
7. SR-D7-07 m3 151,679.460
8. SR-D7-08 m3 59,194.004
1.3.7 Desa Tanjung Harapan
1. TH-D0-01 m3 2,090,231.020
2. TH-D0-02 m3 1,329,684.880
1.3.8 Desa Aras
1. AR-D0-01 m3 170,918.850
2. AR-D0-02 m3 595,634.670
3 AR-D0-03 m3 179,486.480
4. AR-D0-04 m3 522,999.351
1.3.9 Desa Pematang Kuing
1. PK-D0-01 m3 899,805.3
1.3.10 Desa Gambus Laut
1. GB-D0-01 m3 193,914.053
2. GB-D0-02 m3 23,851.025
3 GB-D0-03 m3 150,700.496
4. GB-D0-04 m3 77,580.684
5. GB-D0-05 m3 25,827.147
6. GB-D0-06 m3 28,878.229
7. GB-D0-07 m3 56,566.178
8. GB-D0-08 m3 15,879.486
9. GB-D0-09 m3 5,974.301
10. GB-D0-10 m3 8,525.481
11. GB-D0-11 m3 6,473.021
B Pengangkatan Tanah Top Soil ke Bak DT
1.3.1 Dusun I Kuala Tanjung
1. KT-D1-01 m3 245,887.415
2. KT-D1-02 m3 688,990.105
1.3.2 Dusun I Kuala Indah
1. KI-D1-01 m3 173,432.2
2. KI-D1-02 m3 179,680.3
3 KI-D1-03 m3 60,853.0
4. KI-D1-04 m3 201,765.5
5. KI-D1-05 m3 352,565.3
1.3.3 Dusun II Kuala Indah
1. KI-D2-01 m3 610,411.602
2. KI-D2-02 m3 318,544.886
3. KI-D2-03 m3 157,373.619
1.3.4 Dusun IV Kuala Indah
1. KI-D4-01 m3 731,436.085
2. KI-D4-02 m3 38,418.275
3 KI-D4-03 m3 24,948.020
4. KI-D4-04 m3 86,376.341
5. KI-D4-05 m3 200,685.033
6. KI-D4-06 m3 308,629.247
7. KI-D4-07 m3 741,859.669
8. KI-D4-08 m3 302,608.744
9. KI-D4-09 m3 236,062.612
10. KI-D4-10 m3 136,584.391
11. KI-D4-11 m3 40,583.967
12. KI-D4-12 m3 42,316.475
13. KI-D4-13 m3 79,926.970
14. KI-D4-14 m3 189,130.538
15. KI-D4-15 m3 585,470.350
16. KI-D4-16 m3 153,754.525
1.3.5 Dusun VI Suka Ramai
1. SR-D6-01 m3 850,583.796
2. SR-D6-02 m3 361,327.764
3 SR-D6-03 m3 528,685.664
1.3.6 Dusun VII Suka Ramai
1. SR-D7-01 m3 25,002.471
2. SR-D7-02 m3 81,378.293
3 SR-D7-03 m3 58,544.375
4. SR-D7-04 m3 92,000.827
5. SR-D7-05 m3 67,447.332
6. SR-D7-06 m3 69,196.495
7. SR-D7-07 m3 153,551.286
8. SR-D7-08 m3 61,065.830
1.3.7 Desa Tanjung Harapan
1. TH-D0-01 m3 2,104,158.578
2. TH-D0-02 m3 1,343,612.438
1.3.8 Desa Aras
1. AR-D0-01 m3 178,259.045
2. AR-D0-02 m3 602,974.865
3 AR-D0-03 m3 186,826.675
4. AR-D0-04 m3 530,339.546
1.3.9 Desa Pematang Kuing
1. PK-D0-01 m3 910,407.4
1.3.10 Desa Gambus Laut
1. GB-D0-01 m3 196,166.432
2. GB-D0-02 m3 26,103.405
3 GB-D0-03 m3 152,952.875
4. GB-D0-04 m3 79,833.063
5. GB-D0-05 m3 28,079.526
6. GB-D0-06 m3 31,130.608
7. GB-D0-07 m3 58,818.557
8. GB-D0-08 m3 18,131.865
9. GB-D0-09 m3 8,226.681
10. GB-D0-10 m3 10,777.860
11. GB-D0-11 m3 8,725.400
B Pengangkatan Tanah ke Bak DT Dan DT angkut material dari lokasi pekerjaan ke TPA
untuk biaya pengangkutan sudah include dihitung pada AHSP (Galian-Angkut-Padatkan)
1.3.1 Dusun I Kuala Tanjung
1. KT-D1-01 m3 245,887.415
2. KT-D1-02 m3 688,990.105
1.3.2 Dusun I Kuala Indah
1. KI-D1-01 m3 173,432.2
2. KI-D1-02 m3 179,680.3
3 KI-D1-03 m3 60,853.0
4. KI-D1-04 m3 201,765.5
5. KI-D1-05 m3 352,565.3
1.3.3 Dusun II Kuala Indah
1. KI-D2-01 m3 610,411.602
2. KI-D2-02 m3 318,544.886
3. KI-D2-03 m3 157,373.619
1.3.4 Dusun IV Kuala Indah
1. KI-D4-01 m3 731,436.085
2. KI-D4-02 m3 38,418.275
3 KI-D4-03 m3 24,948.020
4. KI-D4-04 m3 86,376.341
5. KI-D4-05 m3 200,685.033
6. KI-D4-06 m3 308,629.247
7. KI-D4-07 m3 741,859.669
8. KI-D4-08 m3 302,608.744
9. KI-D4-09 m3 236,062.612
10. KI-D4-10 m3 136,584.391
11. KI-D4-11 m3 40,583.967
12. KI-D4-12 m3 42,316.475
13. KI-D4-13 m3 79,926.970
14. KI-D4-14 m3 189,130.538
15. KI-D4-15 m3 585,470.350
16. KI-D4-16 m3 153,754.525
1.3.5 Dusun VI Suka Ramai
1. SR-D6-01 m3 850,583.796
2. SR-D6-02 m3 361,327.764
3 SR-D6-03 m3 528,685.664
1.3.6 Dusun VII Suka Ramai
1. SR-D7-01 m3 25,002.471
2. SR-D7-02 m3 81,378.293
3 SR-D7-03 m3 58,544.375
4. SR-D7-04 m3 92,000.827
5. SR-D7-05 m3 67,447.332
6. SR-D7-06 m3 69,196.495
7. SR-D7-07 m3 153,551.286
8. SR-D7-08 m3 61,065.830
1.3.7 Desa Tanjung Harapan
1. TH-D0-01 m3 2,104,158.578
2. TH-D0-02 m3 1,343,612.438
1.3.8 Desa Aras
1. AR-D0-01 m3 178,259.045
2. AR-D0-02 m3 602,974.865
3 AR-D0-03 m3 186,826.675
4. AR-D0-04 m3 530,339.546
1.3.9 Desa Pematang Kuing
1. PK-D0-01 m3 910,407.4
1.3.10 Desa Gambus Laut
1. GB-D0-01 m3 196,166.432
2. GB-D0-02 m3 26,103.405
3 GB-D0-03 m3 152,952.875
4. GB-D0-04 m3 79,833.063
5. GB-D0-05 m3 28,079.526
6. GB-D0-06 m3 31,130.608
7. GB-D0-07 m3 58,818.557
8. GB-D0-08 m3 18,131.865
9. GB-D0-09 m3 8,226.681
10. GB-D0-10 m3 10,777.860
11. GB-D0-11 m3 8,725.400
C Tanah Dihampar, diratakan dan Merapikan Tanah Stripping Di TPA
1.3.1 Dusun I Kuala Tanjung
1. KT-D1-01 m3 245,887.4
2. KT-D1-02 m3 688,990.1
1.3.2 Dusun I Kuala Indah
1. KI-D1-01 m3 173,432.2
2. KI-D1-02 m3 179,680.3
3 KI-D1-03 m3 60,853.0
4. KI-D1-04 m3 201,765.5
5. KI-D1-05 m3 352,565.3
1.3.3 Dusun II Kuala Indah
1. KI-D2-01 m3 610,411.6
2. KI-D2-02 m3 318,544.9
3. KI-D2-03 m3 157,373.6
1.3.4 Dusun IV Kuala Indah
1. KI-D4-01 m3 731,436.1
2. KI-D4-02 m3 38,418.3
3 KI-D4-03 m3 24,948.0
4. KI-D4-04 m3 86,376.3
5. KI-D4-05 m3 200,685.0
6. KI-D4-06 m3 308,629.2
7. KI-D4-07 m3 741,859.7
8. KI-D4-08 m3 302,608.7
9. KI-D4-09 m3 236,062.6
10. KI-D4-10 m3 136,584.4
11. KI-D4-11 m3 40,584.0
12. KI-D4-12 m3 42,316.5
13. KI-D4-13 m3 79,927.0
14. KI-D4-14 m3 189,130.5
15. KI-D4-15 m3 585,470.3
16. KI-D4-16 m3 153,754.5
1.3.5 Dusun VI Suka Ramai
1. SR-D6-01 m3 850,583.8
2. SR-D6-02 m3 361,327.8
3 SR-D6-03 m3 528,685.7
1.3.6 Dusun VII Suka Ramai
1. SR-D7-01 m3 25,002.5
2. SR-D7-02 m3 81,378.3
3 SR-D7-03 m3 58,544.4
4. SR-D7-04 m3 92,000.8
5. SR-D7-05 m3 67,447.3
6. SR-D7-06 m3 69,196.5
7. SR-D7-07 m3 153,551.3
8. SR-D7-08 m3 61,065.8
1.3.7 Desa Tanjung Harapan
1. TH-D0-01 m3 2,104,158.6
2. TH-D0-02 m3 1,343,612.4
1.3.8 Desa Aras
1. AR-D0-01 m3 178,259.0
2. AR-D0-02 m3 602,974.9
3 AR-D0-03 m3 186,826.7
4. AR-D0-04 m3 530,339.5
1.3.9 Desa Pematang Kuing
1. PK-D0-01 m3 910,407.4
1.3.10 Desa Gambus Laut
GB-D0-01 m3 196,166.4
GB-D0-02 m3 26,103.4
GB-D0-03 m3 152,952.9
GB-D0-04 m3 79,833.1
GB-D0-05 m3 28,079.5
GB-D0-06 m3 31,130.6
GB-D0-07 m3 58,818.6
GB-D0-08 m3 18,131.9
GB-D0-09 m3 8,226.7
GB-D0-10 m3 10,777.9
GB-D0-11 m3 8,725.4
Total Harga Pekerjaan Stripping Top Soil
2.1 Disposal
Dusun I Kuala Tanjung
1. Concrete Quarry m3 372.363
2. Brick Wall Quarry m3 305.138
3 Wood TPA m3 678.963
4. River stone Quarry m3 244.170
5. Seng/alumunium TPA m3 251.472
6. Glass TPA m3 3.078
Dusun I Kuala Indah -
1. Concrete m3 10,952.561
2. Brick Wall m3 13,412.302
3 Wood m3 5,299.902
4. River stone m3 9,223.919
5. Seng/alumunium m3 5,640.812
6. Glass m3 76.788
Dusun II Kuala Indah -
1. Concrete m3 8,146.481
2. Brick Wall m3 13,340.040
3 Wood m3 3,265.785
4. River stone m3 8,952.884
5. Seng/alumunium m3 5,297.604
6. Glass m3 65.813
Dusun IV Kuala Indah -
1. Concrete m3 9,245.288
2. Brick Wall m3 10,823.978
3 Wood m3 6,675.119
4. River stone m3 7,216.698
5. Seng/alumunium m3 5,100.652
6. Glass m3 59.130
Dusun VI & VII Suka Ramai -
1. Concrete m3 7,298.780
2. Brick Wall m3 9,185.738
3 Wood m3 5,499.441
4. River stone m3 6,541.395
5. Seng/alumunium m3 4,378.796
6. Glass m3 54.594
Desa Gambus Laut -
1. Concrete m3 4,572.570
2. Brick Wall m3 5,649.030
3 Wood m3 3,104.556
4. River stone m3 3,972.650
5. Seng/alumunium m3 2,679.624
6. Glass m3 33.008
Desa Tanjung Harapan -
1. Concrete m3 254.745
2. Brick Wall m3 408.488
3 Wood m3 252.442
4. River stone m3 290.520
5. Seng/alumunium m3 209.052
6. Glass m3 1.701
Desa Aras -
1. Concrete m3 15.450
2. Brick Wall m3 9.750
3 Wood m3 178.992
4. River stone m3 9.750
5. Seng/alumunium m3 47.216
6. Glass m3 0.162
Desa Pematang Kuing -
1. Concrete m3 149.425
2. Brick Wall m3 228.938
3 Wood m3 175.445
4. River stone m3 175.155
5. Seng/alumunium m3 117.932
6. Glass m3 1.458
Total Pekerjaan Pembongkaran Rumah
ND PREPARATION
58,330 276,649,273.9
58,330 814,496,846.3
58,330 676,255,388.0
58,330 1,393,265,480.3
58,330 1,306,743,774.7
58,330 873,468,943.0
58,330 1,624,788,974.6
58,330 1,712,614,355.7
58,330 618,420,259.7
58,330 1,445,194,229.4
it 10,741,897,525.5
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
21,390 5,208,807,240.0
21,390 14,686,773,781.0
21,390 3,649,977,749.0
21,390 3,783,625,684.6
21,390 1,241,908,940.0
21,390 4,256,027,130.8
21,390 7,481,635,102.7
21,390 12,974,041,717.7
21,390 6,731,012,664.5
21,390 3,283,559,264.0
21,390 15,613,485,377.8
21,390 789,834,413.0
21,390 501,705,658.5
21,390 1,815,657,459.3
21,390 4,260,720,368.3
21,390 6,569,647,103.4
21,390 15,836,445,830.4
21,390 6,440,868,548.3
21,390 5,017,446,779.2
21,390 2,889,607,635.1
21,390 836,158,562.6
21,390 873,216,910.5
21,390 1,677,705,406.2
21,390 4,013,569,716.3
21,390 12,491,278,297.2
21,390 3,256,876,797.1
21,390 18,034,256,840.5
21,390 7,569,070,319.7
21,390 11,148,855,800.7
21,390 494,764,497.5
21,390 1,700,643,336.6
21,390 1,212,225,821.8
21,390 1,927,859,328.4
21,390 1,402,660,080.1
21,390 1,440,074,670.4
21,390 3,244,423,651.0
21,390 1,266,159,747.1
21,390 44,710,041,515.6
21,390 28,441,959,582.9
21,390 3,655,954,201.5
21,390 12,740,625,591.3
21,390 3,839,215,807.2
21,390 11,186,956,112.2
21,390 19,246,835,153.1
21,390 4,147,821,589.7
21,390 510,173,429.1
21,390 3,223,483,603.4
21,390 1,659,450,830.8
21,390 552,442,674.3
21,390 617,705,318.3
21,390 1,209,950,547.4
21,390 339,662,205.5
21,390 127,790,306.9
21,390 182,360,030.0
21,390 138,457,910.6
14,580 3,585,038,510.7
14,580 10,045,475,732.2
14,580 2,528,640,982.5
14,580 2,619,739,014.4
14,580 887,236,436.7
14,580 2,941,740,561.2
14,580 5,140,401,815.5
14,580 8,899,801,160.2
14,580 4,644,384,442.3
14,580 2,294,507,369.9
14,580 10,664,338,121.8
14,580 560,138,445.9
14,580 363,742,128.0
14,580 1,259,367,058.1
14,580 2,925,987,778.7
14,580 4,499,814,417.2
14,580 10,816,313,970.2
14,580 4,412,035,486.2
14,580 3,441,792,877.8
14,580 1,991,400,417.8
14,580 591,714,233.7
14,580 616,974,201.5
14,580 1,165,335,223.9
14,580 2,757,523,238.9
14,580 8,536,157,699.4
14,580 2,241,740,968.6
14,580 12,401,511,743.2
14,580 5,268,158,799.1
14,580 7,708,236,981.1
14,580 364,536,029.7
14,580 1,186,495,518.9
14,580 853,576,988.4
14,580 1,341,372,057.4
14,580 983,382,107.0
14,580 1,008,884,899.3
14,580 2,238,777,752.8
14,580 890,339,804.3
14,580 30,678,632,073.0
14,580 19,589,869,353.1
14,580 2,599,016,879.7
14,580 8,791,373,535.3
14,580 2,723,932,925.1
14,580 7,732,350,580.4
14,580 13,273,739,687.9
14,580 2,860,106,582.5
14,580 380,587,639.9
14,580 2,230,052,920.0
14,580 1,163,966,065.2
14,580 409,399,495.7
14,580 453,884,271.3
14,580 857,574,567.7
14,580 264,362,598.3
14,580 119,945,006.9
14,580 157,141,199.6
14,580 127,216,332.8
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
8,625 2,120,778,954.4
8,625 5,942,539,656.4
8,625
8,625 1,495,852,433.1
8,625 1,549,742,729.7
8,625 524,856,945.6
8,625 1,740,227,183.8
8,625 3,040,875,559.6
8,625 5,264,800,069.0
8,625 2,747,449,644.4
8,625 1,357,347,466.7
8,625 6,308,636,234.6
8,625 331,357,619.7
8,625 215,176,670.3
8,625 744,995,944.8
8,625 1,730,908,408.2
8,625 2,661,927,253.0
8,625 6,398,539,642.9
8,625 2,610,000,416.2
8,625 2,036,040,025.5
8,625 1,178,040,370.6
8,625 350,036,712.3
8,625 364,979,594.5
8,625 689,370,117.0
8,625 1,631,250,887.2
8,625 5,049,681,766.6
8,625 1,326,132,774.6
8,625 7,336,285,239.0
8,625 3,116,451,964.5
8,625 4,559,913,852.0
8,625 215,646,313.8
8,625 701,887,781.2
8,625 504,945,234.9
8,625 793,507,132.7
8,625 581,733,242.3
8,625 596,819,770.7
8,625 1,324,379,843.5
8,625 526,692,785.5
8,625 18,148,367,738.7
8,625 11,588,657,281.9
8,625 1,537,484,265.3
8,625 5,200,658,212.8
8,625 1,611,380,074.0
8,625 4,574,178,584.1
8,625 7,852,263,704.3
8,625 1,691,935,478.3
8,625 225,141,865.2
8,625 1,319,218,548.4
8,625 688,560,172.3
8,625 242,185,915.7
8,625 268,501,497.9
8,625 507,310,058.0
8,625 156,387,339.5
8,625 70,955,122.4
8,625 92,959,043.0
8,625 75,256,575.5
696,764,451,048.5
14,580 857,519,404.1
14,580 6,374,641,218.2
14,580 3,107,744,933.6
14,580 5,426,784,692.4
14,580 990,983,495.5
14,580 1,253,480,409.6
14,580 10,322,856,638.0
14,580 9,725,398,031.0
14,580 8,205,236,236.8
14,580 3,378,769,706.0
14,580 23,836,128,436.6
14,580 957,006,426.0
14,580 656,690,179.1
14,580 2,303,035,727.8
14,580 5,559,505,000.6
14,580 8,447,347,394.3
14,580 14,133,329,589.7
14,580 9,655,975,796.5
14,580 5,538,635,438.2
14,580 3,672,298,429.0
14,580 1,156,842,442.4
14,580 2,116,840,277.2
14,580 3,683,744,278.1
14,580 8,608,068,379.8
14,580 9,900,786,471.8
14,580 8,003,618,733.3
14,580 -
14,580 -
14,580 9,098,994,868.6
14,580 1,036,402,570.5
14,580 4,733,845,576.5
14,580 2,666,969,898.5
14,580 5,957,249,358.8
14,580 3,210,161,376.3
14,580 5,217,382,950.0
14,580 -
14,580 2,025,630,329.6
14,580 30,057,526,994.9
14,580 20,844,008,776.8
14,580 3,536,524,278.4
14,580 6,216,996,932.8
14,580 4,589,304,900.1
14,580 5,650,927,092.2
14,580 8,634,034,175.9
14,580 -
14,580 171,950,649.8
14,580 -
14,580 -
14,580 -
14,580 -
14,580 -
14,580 -
14,580 -
14,580 -
14,580 -
165,840 49,103,022,654.1
165,840 59,709,869,125.4
165,840 18,596,062,794.5
165,840 -
165,840 8,127,970,642.5
165,840 55,569,944,441.5
165,840 -
165,840 98,517,933,894.9
165,840 -
165,840 -
165,840 71,769,303,868.9
165,840 -
165,840 -
165,840 -
165,840 -
165,840 -
165,840 -
165,840 -
165,840 26,888,413,558.1
165,840 5,255,142,428.5
165,840 -
165,840 -
165,840 14,594,716,485.4
165,840 -
165,840 35,858,629,100.5
165,840 -
165,840 246,548,076,517.4
165,840 99,082,939,612.4
165,840 827,993,784.0
165,840 -
165,840 7,311,148,728.2
165,840 -
165,840 -
165,840 -
165,840 5,599,060,449.8
165,840 108,006,642,452.5
165,840 8,843,781,375.1
165,840 67,082,894,699.8
165,840 27,714,017,196.3
165,840 -
165,840 4,300,253,695.1
165,840 400,356,701.6
165,840 5,578,295,478.1
165,840 103,073,476,751.6
165,840 183,915,663,247.7
165,840 18,167,588,130.0
165,840 120,740,877,119.7
165,840 81,958,804,247.2
165,840 17,154,514,852.0
165,840 30,681,735,217.0
165,840 38,006,656,888.1
165,840 16,565,795,143.4
165,840 3,634,096,772.0
165,840 5,189,071,161.0
165,840 3,103,585,350.2
74,290 4,369,349,556.1
74,290 32,480,939,375.8
74,290 15,835,004,877.5
74,290 27,651,291,824.3
74,290 5,049,393,956.3
74,290 6,386,903,952.8
74,290 52,598,423,843.5
74,290 49,554,171,448.5
74,290 41,808,436,216.4
74,290 17,215,967,178.1
74,290 121,453,085,154.6
74,290 4,876,269,368.3
74,290 3,346,057,160.9
74,290 11,734,741,030.1
74,290 28,327,546,398.8
74,290 43,042,073,931.3
74,290 72,014,064,144.0
74,290 49,200,441,832.8
74,290 28,221,208,964.4
74,290 18,711,594,670.0
74,290 5,894,501,032.1
74,290 10,786,012,633.3
74,290 18,769,915,118.0
74,290 43,861,001,367.1
74,290 50,447,834,498.5
74,290 40,781,127,276.7
74,290 -
74,290 -
74,290 46,362,436,816.7
74,290 5,280,819,407.6
74,290 24,120,534,147.8
74,290 13,589,107,939.6
74,290 30,354,187,576.4
74,290 16,356,851,073.1
74,290 26,584,319,571.8
74,290 -
74,290 10,321,267,296.5
74,290 153,153,201,677.2
74,290 106,207,229,905.8
74,290 18,019,779,742.4
74,290 31,677,688,761.4
74,290 23,384,050,825.2
74,290 28,793,372,680.1
74,290 43,993,305,825.1
74,290 -
74,290 876,146,349.1
74,290 -
74,290 -
74,290 -
74,290 -
74,290 -
74,290 -
74,290 -
74,290 -
74,290 -
65,230 23,150,231,110.1
65,230 52,005,477,012.5
65,230 21,218,259,878.2
65,230 24,279,092,283.0
65,230 7,630,581,106.1
65,230 27,465,367,068.7
65,230 46,183,809,224.9
65,230 82,260,974,352.0
65,230 36,709,709,172.1
65,230 15,116,402,463.7
65,230 134,875,006,558.1
65,230 4,281,586,362.8
65,230 2,937,990,424.1
65,230 10,303,636,524.3
65,230 24,872,874,567.1
65,230 37,792,899,213.1
65,230 63,231,624,769.3
65,230 43,200,226,420.2
65,230 35,355,550,785.4
65,230 18,496,640,830.5
65,230 5,175,640,090.5
65,230 10,232,924,178.8
65,230 22,221,391,301.0
65,230 38,511,954,760.7
65,230 58,399,812,809.6
65,230 35,807,685,183.2
65,230 96,974,982,098.6
65,230 38,972,383,929.8
65,230 41,034,003,411.9
65,230 4,636,799,703.3
65,230 24,054,672,384.4
65,230 11,931,855,039.7
65,230 26,652,357,727.9
65,230 14,362,059,436.0
65,230 25,544,528,677.5
65,230 42,482,352,189.9
65,230 12,541,073,513.5
65,230 160,861,265,185.9
65,230 104,155,561,929.4
65,230 15,822,186,466.5
65,230 29,505,873,297.1
65,230 20,689,733,541.2
65,230 27,476,005,584.7
65,230 79,170,112,464.8
65,230 72,339,717,279.6
65,230 7,915,172,570.4
65,230 47,491,120,444.5
65,230 32,236,931,988.9
65,230 6,747,401,132.4
65,230 12,068,075,182.1
65,230 14,949,193,372.0
65,230 6,515,839,467.0
65,230 1,429,402,631.7
65,230 2,041,022,140.8
65,230 1,220,736,085.4
5,166,030,936,792.2
13,419 4,996,631.1
13,419 4,094,557.1
13,419 9,110,819.9
13,419 3,276,450.8
13,419 3,374,434.4
13,419 41,302.8
Rp24,894,196
13,419 146,969,430.9
13,419 179,976,038.3
13,419 71,117,946.8
13,419 123,773,260.7
13,419 75,692,522.3
13,419 1,030,397.3
Rp598,559,596
13,419 109,315,416.6
13,419 179,006,367.4
13,419 43,822,677.8
13,419 120,136,315.8
13,419 71,087,107.5
13,419 883,120.0
Rp524,251,005
13,419 124,060,003.5
13,419 145,244,010.6
13,419 89,571,613.1
13,419 96,838,908.0
13,419 68,444,262.1
13,419 793,449.4
Rp524,952,247
13,419 97,940,343.3
13,419 123,260,913.6
13,419 73,795,507.9
13,419 87,777,200.7
13,419 58,757,872.8
13,419 732,582.0
Rp442,264,420
13,419 61,358,076.7
13,419 75,802,795.7
13,419 41,659,190.2
13,419 53,307,910.0
13,419 35,957,145.8
13,419 442,918.7
Rp268,528,037
13,419 3,418,353.9
13,419 5,481,382.7
13,419 3,387,447.5
13,419 3,898,408.9
13,419 2,805,211.9
13,419 22,825.3
Rp19,013,630
13,419 207,319.3
13,419 130,832.6
13,419 2,401,843.4
13,419 130,832.6
13,419 633,578.7
13,419 2,173.8
Rp3,506,580
13,419 2,005,093.4
13,419 3,072,050.1
13,419 2,354,252.0
13,419 2,350,357.3
13,419 1,582,497.4
13,419 19,564.5
2,417,353,527.0 Rp11,383,815
84,112 31,319,989.3
84,112 25,665,590.0
84,112 57,108,634.6
84,112 20,537,518.7
84,112 21,151,701.3
84,112 258,895.4
Rp156,042,329
84,112 921,236,907.9
84,112 1,128,129,625.0
84,112 445,783,024.4
84,112 775,838,181.3
84,112 474,457,475.5
84,112 6,458,758.2
Rp3,751,903,972
84,112 685,213,215.4
84,112 1,122,051,513.6
84,112 274,690,239.4
84,112 753,041,005.7
84,112 445,589,716.5
84,112 5,535,591.8
Rp3,286,121,282
84,112 777,635,548.5
84,112 910,421,591.7
84,112 561,454,687.3
84,112 607,007,699.4
84,112 429,023,777.3
84,112 4,973,516.3
Rp3,290,516,821
84,112 613,911,739.9
84,112 772,626,675.9
84,112 462,566,569.5
84,112 550,206,913.1
84,112 368,307,345.8
84,112 4,591,986.3
Rp2,772,211,231
84,112 384,605,999.5
84,112 475,148,693.8
84,112 261,129,020.4
84,112 334,145,773.7
84,112 225,387,344.7
84,112 2,776,312.2
Rp1,683,193,144
84,112 21,426,998.4
84,112 34,358,519.3
84,112 21,233,270.2
84,112 24,436,089.3
84,112 17,583,689.0
84,112 143,073.8
Rp119,181,640
84,112 1,299,523.5
84,112 820,087.7
84,112 15,055,285.8
84,112 820,087.7
84,112 3,971,411.2
84,112 13,626.1
Rp21,980,022
84,112 12,568,369.3
84,112 19,256,289.4
84,112 14,756,972.2
84,112 14,732,559.6
84,112 9,919,444.0
84,112 122,634.6
15,152,506,710.5 Rp71,356,269
118,885 1,668,820,096.8
118,885 1,037,018,000.6
118,885 460,620,141.5
118,885 940,693,230.5
118,885 487,325,048.9
118,885 563,622,863.4
118,885 1,291,742,256.4
118,885 659,894,934.4
118,885 732,410,802.6
118,885 110,673,883.6
118,885 526,736,208.9
118,885 246,764,723.6
118,885 139,523,642.8
118,885 210,498,356.1
118,885 505,906,948.4
118,885 707,840,048.9
118,885 161,324,740.1
118,885 1,050,861,228.2
118,885 710,586,881.7
118,885 270,041,879.7
118,885 4,975,318,659.1
154,100 8,402,844,071.3
154,100 4,171,567,454.1
154,100 2,402,373,026.1
154,100 3,833,700,923.3
154,100 2,398,262,854.8
154,100 2,836,575,097.1
154,100 5,211,869,941.7
154,100 3,401,777,953.3
154,100 2,441,066,235.1
-
154,100 2,731,727,040.7
154,100 319,132,024.3
154,100 728,110,265.1
-
-
154,100 3,165,683,069.1
154,100 607,300,747.9
-
154,100 6,063,767,441.3
154,100 4,984,832,275.0
154,100 1,726,703,679.5
-
154,100 29,549,597,054.1
165,840 -
165,840 270,050,617.1
165,840 -
165,840 217,277,995.2
165,840 -
165,840 -
165,840 1,531,520,997.7
165,840 -
165,840 1,514,876,920.3
165,840 638,539,704.6
165,840 -
165,840 969,093,796.1
165,840 -
165,840 1,491,970,137.0
165,840 3,284,424,251.3
165,840 460,825,110.6
165,840 374,190,910.5
165,840 682,152,962.8
165,840 -
165,840 -
165,840 -
113,870,039,133.5
118,885
118,885
118,885
118,885
118,885
118,885
118,885
118,885
118,885
154,100
154,100
154,100
154,100
154,100
154,100
154,100
154,100
154,100
10,000,000 10,000,000.0
10,000,000 10,000,000.0
10,000,000 10,000,000.0
10,000,000 10,000,000.0
10,000,000 10,000,000.0
10,000,000 10,000,000.0
10,000,000 10,000,000.0
10,000,000 10,000,000.0
50,000,000 50,000,000.0
130,000,000.0
200,000,000.0
3,676,713,639.0
623,807,860.0
343,338,616.0
15,840,276.0
19,539,345.0
9,511,898.0
6,488,848.0
10,607,266.0
8,845,990.0
10,470,648.0
-
-
-
PLN 4,725,164,386.0
95,108 293,868,502.7
95,108 467,942,773.0
48,000,000 451,457,280,000.0
30,000,000,000 30,000,000,000.0
Drainage 482,219,091,275.7
3,000,000 2,269,710,000.0
3,000,000 8,072,700,000.0
3,000,000 7,781,400,000.0
3,000,000 3,180,240,000.0
3,000,000 2,800,620,000.0
3,000,000 4,415,520,000.0
28,520,190,000.0
154,100
154,100
-
21,390
-
530,731 22,495,032,587.3
1,291,186 36,153,194.0
22,531,185,781.3
-
7,025,521,907,455.8
180,147.739
Rp83,333
Rp484,339,683,565
Rp484,339,684
Item Pekerjaan
Retaining Wall
Panjang Lebar Tinggi
NO Uraian Pekerjaan Rumus Unit Sat Volume
(m) (m) (m)
Retaining Wall
1. Cut 1 2.3 3 m3 6.9
2. Fill m3 2.3
3. Reinforcement
10 0.003215
10 0.003215
Tulangan utama D10 10 0.003215
10 0.003215
m3 0.012861
Total
kg 100.9623
m3 0.000206
1 m3 0.000368
Sengkang 10D100 3
Total m 0.000574
kg 4.504656
Total kg 105.467
4. Concrete
I 1 1.215 2.66 m3 3.2319
II 1 0.23 0.34 m3 0.0782
3
Total m 3.3101
5. Formwork
I 1 m2 1.380213
2
II 1 m 5.28
2
III 1 m 4.7
Total m2 11.36021
Item Pekerjaan
Wet Stone Masonry
Panjang Lebar
NO Uraian Pekerjaan Rumus Tinggi (m) Unit Sat
(m) (m)
Wet Stone Masonry
1. Cut 1 0.72 0.9 m3
2. Fill m3
2
3. Stone
I 1 0.324 2.82 m3
II 1 0.72 0.18 m3
III 1 1 0.108 m3
Total
Item Pekerjaan
Wet Stone Masonry
Panjang
Volume NO Uraian Pekerjaan Rumus Lebar (m) Tinggi (m) Unit
(m)
Coastal Wet Masonry Revetment
0.648 3. Stone
4 I 1 0.7 0.5
0.216 II 1 0.7 6.7
III 1
Total
0.91368
0.1296
0.324
1.36728
Sat Volume
m3 0.35
m3 4.69
m3 2.337
7.377
ONSHORE LAND PREPARATION STUDY, NGRR LOCATION PLAN
FOR KUALA TANJUNG BATU BARA REGENCY - SUMATERA UTRA
PROVINCE
I Land Clearing
1.1 Demolition of Palm Oil Tree
1.1.1 Dusun I Kuala Tanjung m3 4,742.830
3
1.1.2 Dusun I Kuala Indah m 13,963.601
1.1.3 Dusun II Kuala Indah m3 11,593.612
3
1.1.4 Dusun IV Kuala Indah m 23,885.916
3
1.1.5 Dusun VI Suka Ramai m 22,402.602
1.1.6 Dusun VII Suka Ramai m3 14,974.609
3
1.1.7 Desa Tanjung Harapan m 27,855.117
3
1.1.8 Desa Aras m 29,360.781
1.1.9 Desa Pematang Kruing m3 10,602.096
1.1.10 Desa Gambus Laut m3 24,776.174
Total Harga Pekerjaan Pemotongan Kelapa Sawit
Untuk pengangkutan sampah sawit sudah dihitung pada pengangkutan Stripping Top Soil
1.2 Disposal of Oil Palm Tree
1.2.1 Dusun I Kuala Tanjung m3 4,742.830
1.2.2 Dusun I Kuala Indah m3 13,963.601
1.2.3 Dusun II Kuala Indah m3 11,593.612
1.2.4 Dusun IV Kuala Indah m3 23,885.916
1.2.5 Dusun VI Suka Ramai m3 22,402.602
1.2.6 Dusun VII Suka Ramai m3 14,974.609
1.2.7 Desa Tanjung Harapan m3 27,855.117
1.2.8 Desa Aras m3 29,360.781
1.2.9 Desa Pematang Kruing m3 10,602.096
1.2.10 Desa Gambus Laut m3 24,776.174
1.3 Stripping /Cutting Top Soil
A Pekerjaan Galian Tanah Top Soil
1.3.1 Dusun I Kuala Tanjung
1. KT-D1-01 m3 243,516.000
2. KT-D1-02 m3 686,618.690
1.3.2 Dusun I Kuala Indah
1. KI-D1-01 m3 170,639.4
2. KI-D1-02 m3 176,887.6
3 KI-D1-03 m3 58,060.3
4. KI-D1-04 m3 198,972.8
5. KI-D1-05 m3 349,772.6
1.3.3 Dusun II Kuala Indah
1. KI-D2-01 m3 606,547.065
2. KI-D2-02 m3 314,680.349
3. KI-D2-03 m3 153,509.082
1.3.4 Dusun IV Kuala Indah
1. KI-D4-01 m3 729,943.215
2. KI-D4-02 m3 36,925.405
3 KI-D4-03 m3 23,455.150
4. KI-D4-04 m3 84,883.472
5. KI-D4-05 m3 199,192.163
6. KI-D4-06 m3 307,136.377
7. KI-D4-07 m3 740,366.799
8. KI-D4-08 m3 301,115.874
9. KI-D4-09 m3 234,569.742
10. KI-D4-10 m3 135,091.521
11. KI-D4-11 m3 39,091.097
12. KI-D4-12 m3 40,823.605
13. KI-D4-13 m3 78,434.100
14. KI-D4-14 m3 187,637.668
15. KI-D4-15 m3 583,977.480
16. KI-D4-16 m3 152,261.655
1.3.5 Dusun VI Suka Ramai
1. SR-D6-01 m3 843,116.262
2. SR-D6-02 m3 353,860.230
3 SR-D6-03 m3 521,218.130
1.3.6 Dusun VII Suka Ramai
1. SR-D7-01 m3 23,130.645
2. SR-D7-02 m3 79,506.467
3 SR-D7-03 m3 56,672.549
4. SR-D7-04 m3 90,129.001
5. SR-D7-05 m3 65,575.506
6. SR-D7-06 m3 67,324.669
7. SR-D7-07 m3 151,679.460
8. SR-D7-08 m3 59,194.004
1.3.7 Desa Tanjung Harapan
1. TH-D0-01 m3 2,090,231.020
2. TH-D0-02 m3 1,329,684.880
1.3.8 Desa Aras
1. AR-D0-01 m3 170,918.850
2. AR-D0-02 m3 595,634.670
3 AR-D0-03 m3 179,486.480
4. AR-D0-04 m3 522,999.351
1.3.9 Desa Pematang Kuing
1. PK-D0-01 m3 899,805.3
1.3.10 Desa Gambus Laut
GB-D0-01 m3 193,914.053
GB-D0-02 m3 23,851.025
GB-D0-03 m3 150,700.496
GB-D0-04 m3 77,580.684
GB-D0-05 m3 25,827.147
GB-D0-06 m3 28,878.229
GB-D0-07 m3 56,566.178
GB-D0-08 m3 15,879.486
GB-D0-09 m3 5,974.301
GB-D0-10 m3 8,525.481
GB-D0-11 m3 6,473.021
B Pengangkatan Tanah Top Soil ke Bak DT
1.3.1 Dusun I Kuala Tanjung
1. KT-D1-01 m3 245,887.415
2. KT-D1-02 m3 688,990.105
1.3.2 Dusun I Kuala Indah
1. KI-D1-01 m3 173,432.2
2. KI-D1-02 m3 179,680.3
3 KI-D1-03 m3 60,853.0
4. KI-D1-04 m3 201,765.5
5. KI-D1-05 m3 352,565.3
1.3.3 Dusun II Kuala Indah
1. KI-D2-01 m3 610,411.602
2. KI-D2-02 m3 318,544.886
3. KI-D2-03 m3 157,373.619
1.3.4 Dusun IV Kuala Indah
1. KI-D4-01 m3 731,436.085
2. KI-D4-02 m3 38,418.275
3 KI-D4-03 m3 24,948.020
4. KI-D4-04 m3 86,376.341
5. KI-D4-05 m3 200,685.033
6. KI-D4-06 m3 308,629.247
7. KI-D4-07 m3 741,859.669
8. KI-D4-08 m3 302,608.744
9. KI-D4-09 m3 236,062.612
10. KI-D4-10 m3 136,584.391
11. KI-D4-11 m3 40,583.967
12. KI-D4-12 m3 42,316.475
13. KI-D4-13 m3 79,926.970
14. KI-D4-14 m3 189,130.538
15. KI-D4-15 m3 585,470.350
16. KI-D4-16 m3 153,754.525
1.3.5 Dusun VI Suka Ramai
1. SR-D6-01 m3 850,583.796
2. SR-D6-02 m3 361,327.764
3 SR-D6-03 m3 528,685.664
1.3.6 Dusun VII Suka Ramai
1. SR-D7-01 m3 25,002.471
2. SR-D7-02 m3 81,378.293
3 SR-D7-03 m3 58,544.375
4. SR-D7-04 m3 92,000.827
5. SR-D7-05 m3 67,447.332
6. SR-D7-06 m3 69,196.495
7. SR-D7-07 m3 153,551.286
8. SR-D7-08 m3 61,065.830
1.3.7 Desa Tanjung Harapan
1. TH-D0-01 m3 2,104,158.578
2. TH-D0-02 m3 1,343,612.438
1.3.8 Desa Aras
1. AR-D0-01 m3 178,259.045
2. AR-D0-02 m3 602,974.865
3 AR-D0-03 m3 186,826.675
4. AR-D0-04 m3 530,339.546
1.3.9 Desa Pematang Kuing
1. PK-D0-01 m3 910,407.4
1.3.10 Desa Gambus Laut
1. GB-D0-01 m3 196,166.432
2. GB-D0-02 m3 26,103.405
3 GB-D0-03 m3 152,952.875
4. GB-D0-04 m3 79,833.063
5. GB-D0-05 m3 28,079.526
6. GB-D0-06 m3 31,130.608
7. GB-D0-07 m3 58,818.557
8. GB-D0-08 m3 18,131.865
9. GB-D0-09 m3 8,226.681
10. GB-D0-10 m3 10,777.860
11. GB-D0-11 m3 8,725.400
B Pengangkatan Tanah ke Bak DT Dan DT angkut material dari lokasi pekerjaan ke Quarry
untuk biaya pengangkutan sudah include dihitung pada AHSP (Galian-Angkut-Padatkan)
1.3.1 Dusun I Kuala Tanjung
1. KT-D1-01 m3 245,887.415
2. KT-D1-02 m3 688,990.105
1.3.2 Dusun I Kuala Indah
1. KI-D1-01 m3 173,432.2
2. KI-D1-02 m3 179,680.3
3 KI-D1-03 m3 60,853.0
4. KI-D1-04 m3 201,765.5
5. KI-D1-05 m3 352,565.3
1.3.3 Dusun II Kuala Indah
1. KI-D2-01 m3 610,411.602
2. KI-D2-02 m3 318,544.886
3. KI-D2-03 m3 157,373.619
1.3.4 Dusun IV Kuala Indah
1. KI-D4-01 m3 731,436.085
2. KI-D4-02 m3 38,418.275
3 KI-D4-03 m3 24,948.020
4. KI-D4-04 m3 86,376.341
5. KI-D4-05 m3 200,685.033
6. KI-D4-06 m3 308,629.247
7. KI-D4-07 m3 741,859.669
8. KI-D4-08 m3 302,608.744
9. KI-D4-09 m3 236,062.612
10. KI-D4-10 m3 136,584.391
11. KI-D4-11 m3 40,583.967
12. KI-D4-12 m3 42,316.475
13. KI-D4-13 m3 79,926.970
14. KI-D4-14 m3 189,130.538
15. KI-D4-15 m3 585,470.350
16. KI-D4-16 m3 153,754.525
1.3.5 Dusun VI Suka Ramai
1. SR-D6-01 m3 850,583.796
2. SR-D6-02 m3 361,327.764
3 SR-D6-03 m3 528,685.664
1.3.6 Dusun VII Suka Ramai
1. SR-D7-01 m3 25,002.471
2. SR-D7-02 m3 81,378.293
3 SR-D7-03 m3 58,544.375
4. SR-D7-04 m3 92,000.827
5. SR-D7-05 m3 67,447.332
6. SR-D7-06 m3 69,196.495
7. SR-D7-07 m3 153,551.286
8. SR-D7-08 m3 61,065.830
1.3.7 Desa Tanjung Harapan
1. TH-D0-01 m3 2,104,158.578
2. TH-D0-02 m3 1,343,612.438
1.3.8 Desa Aras
1. AR-D0-01 m3 178,259.045
2. AR-D0-02 m3 602,974.865
3 AR-D0-03 m3 186,826.675
4. AR-D0-04 m3 530,339.546
1.3.9 Desa Pematang Kuing
1. PK-D0-01 m3 910,407.4
1.3.10 Desa Gambus Laut
1. GB-D0-01 m3 196,166.432
2. GB-D0-02 m3 26,103.405
3 GB-D0-03 m3 152,952.875
4. GB-D0-04 m3 79,833.063
5. GB-D0-05 m3 28,079.526
6. GB-D0-06 m3 31,130.608
7. GB-D0-07 m3 58,818.557
8. GB-D0-08 m3 18,131.865
9. GB-D0-09 m3 8,226.681
10. GB-D0-10 m3 10,777.860
11. GB-D0-11 m3 8,725.400
C Tanah Dihampar, diratakan dan Merapikan Tanah Stripping Di TPA
1.3.1 Dusun I Kuala Tanjung
1. KT-D1-01 m3 245,887.4
2. KT-D1-02 m3 688,990.1
1.3.2 Dusun I Kuala Indah
1. KI-D1-01 m3 173,432.2
2. KI-D1-02 m3 179,680.3
3 KI-D1-03 m3 60,853.0
4. KI-D1-04 m3 201,765.5
5. KI-D1-05 m3 352,565.3
1.3.3 Dusun II Kuala Indah
1. KI-D2-01 m3 610,411.6
2. KI-D2-02 m3 318,544.9
3. KI-D2-03 m3 157,373.6
1.3.4 Dusun IV Kuala Indah
1. KI-D4-01 m3 731,436.1
2. KI-D4-02 m3 38,418.3
3 KI-D4-03 m3 24,948.0
4. KI-D4-04 m3 86,376.3
5. KI-D4-05 m3 200,685.0
6. KI-D4-06 m3 308,629.2
7. KI-D4-07 m3 741,859.7
8. KI-D4-08 m3 302,608.7
9. KI-D4-09 m3 236,062.6
10. KI-D4-10 m3 136,584.4
11. KI-D4-11 m3 40,584.0
12. KI-D4-12 m3 42,316.5
13. KI-D4-13 m3 79,927.0
14. KI-D4-14 m3 189,130.5
15. KI-D4-15 m3 585,470.3
16. KI-D4-16 m3 153,754.5
1.3.5 Dusun VI Suka Ramai
1. SR-D6-01 m3 850,583.8
2. SR-D6-02 m3 361,327.8
3 SR-D6-03 m3 528,685.7
1.3.6 Dusun VII Suka Ramai
1. SR-D7-01 m3 25,002.5
2. SR-D7-02 m3 81,378.3
3 SR-D7-03 m3 58,544.4
4. SR-D7-04 m3 92,000.8
5. SR-D7-05 m3 67,447.3
6. SR-D7-06 m3 69,196.5
7. SR-D7-07 m3 153,551.3
8. SR-D7-08 m3 61,065.8
1.3.7 Desa Tanjung Harapan
1. TH-D0-01 m3 2,104,158.6
2. TH-D0-02 m3 1,343,612.4
1.3.8 Desa Aras
1. AR-D0-01 m3 178,259.0
2. AR-D0-02 m3 602,974.9
3 AR-D0-03 m3 186,826.7
4. AR-D0-04 m3 530,339.5
1.3.9 Desa Pematang Kuing
1. PK-D0-01 m3 910,407.4
1.3.10 Desa Gambus Laut
GB-D0-01 m3 196,166.4
GB-D0-02 m3 26,103.4
GB-D0-03 m3 152,952.9
GB-D0-04 m3 79,833.1
GB-D0-05 m3 28,079.5
GB-D0-06 m3 31,130.6
GB-D0-07 m3 58,818.6
GB-D0-08 m3 18,131.9
GB-D0-09 m3 8,226.7
GB-D0-10 m3 10,777.9
GB-D0-11 m3 8,725.4
Total Harga Pekerjaan Stripping Top Soil
2.1 Disposal
Dusun I Kuala Tanjung
1. Concrete m3 372.363
2. Brick Wall m3 305.138
3 Wood m3 678.963
4. River stone m3 244.170
5. Seng/alumunium m3 251.472
6. Glass m3 3.078
Dusun I Kuala Indah -
1. Concrete m3 10,952.561
2. Brick Wall m3 13,412.302
3 Wood m3 5,299.902
4. River stone m3 9,223.919
5. Seng/alumunium m3 5,640.812
6. Glass m3 76.788
Dusun II Kuala Indah -
1. Concrete m3 8,146.481
2. Brick Wall m3 13,340.040
3 Wood m3 3,265.785
4. River stone m3 8,952.884
5. Seng/alumunium m3 5,297.604
6. Glass m3 65.813
Dusun IV Kuala Indah -
1. Concrete m3 9,245.288
2. Brick Wall m3 10,823.978
3 Wood m3 6,675.119
4. River stone m3 7,216.698
5. Seng/alumunium m3 5,100.652
6. Glass m3 59.130
Dusun VI & VII Suka Ramai -
1. Concrete m3 7,298.780
2. Brick Wall m3 9,185.738
3 Wood m3 5,499.441
4. River stone m3 6,541.395
5. Seng/alumunium m3 4,378.796
6. Glass m3 54.594
Desa Gambus Laut -
1. Concrete m3 4,572.570
2. Brick Wall m3 5,649.030
3 Wood m3 3,104.556
4. River stone m3 3,972.650
5. Seng/alumunium m3 2,679.624
6. Glass m3 33.008
Desa Tanjung Harapan -
1. Concrete m3 254.745
2. Brick Wall m3 408.488
3 Wood m3 252.442
4. River stone m3 290.520
5. Seng/alumunium m3 209.052
6. Glass m3 1.701
Desa Aras -
1. Concrete m3 15.450
2. Brick Wall m3 9.750
3 Wood m3 178.992
4. River stone m3 9.750
5. Seng/alumunium m3 47.216
6. Glass m3 0.162
Desa Pematang Kuing -
1. Concrete m3 149.425
2. Brick Wall m3 228.938
3 Wood m3 175.445
4. River stone m3 175.155
5. Seng/alumunium m3 117.932
6. Glass m3 1.458
Total Pekerjaan Pembongkaran Rumah
Rp58,330 Rp276,649,274
Rp58,330 Rp814,496,846
Rp58,330 Rp676,255,388
Rp58,330 Rp1,393,265,480
Rp58,330 Rp1,306,743,775
Rp58,330 Rp873,468,943
Rp58,330 Rp1,624,788,975
Rp58,330 Rp1,712,614,356
Rp58,330 Rp618,420,260
Rp58,330 Rp1,445,194,229
Sawit Rp10,741,897,526
utan Stripping Top Soil
Rp0 Rp0
Rp0 Rp0
Rp0 Rp0
Rp0 Rp0
Rp0 Rp0
Rp0 Rp0
Rp0 Rp0
Rp0 Rp0
Rp0 Rp0
Rp0 Rp0
Rp21,390 Rp5,208,807,240
Rp21,390 Rp14,686,773,781
Rp21,390 Rp3,649,977,749
Rp21,390 Rp3,783,625,685
Rp21,390 Rp1,241,908,940
Rp21,390 Rp4,256,027,131
Rp21,390 Rp7,481,635,103
Rp21,390 Rp12,974,041,718
Rp21,390 Rp6,731,012,664
Rp21,390 Rp3,283,559,264
Rp21,390 Rp15,613,485,378
Rp21,390 Rp789,834,413
Rp21,390 Rp501,705,659
Rp21,390 Rp1,815,657,459
Rp21,390 Rp4,260,720,368
Rp21,390 Rp6,569,647,103
Rp21,390 Rp15,836,445,830
Rp21,390 Rp6,440,868,548
Rp21,390 Rp5,017,446,779
Rp21,390 Rp2,889,607,635
Rp21,390 Rp836,158,563
Rp21,390 Rp873,216,910
Rp21,390 Rp1,677,705,406
Rp21,390 Rp4,013,569,716
Rp21,390 Rp12,491,278,297
Rp21,390 Rp3,256,876,797
Rp21,390 Rp18,034,256,840
Rp21,390 Rp7,569,070,320
Rp21,390 Rp11,148,855,801
Rp21,390 Rp494,764,498
Rp21,390 Rp1,700,643,337
Rp21,390 Rp1,212,225,822
Rp21,390 Rp1,927,859,328
Rp21,390 Rp1,402,660,080
Rp21,390 Rp1,440,074,670
Rp21,390 Rp3,244,423,651
Rp21,390 Rp1,266,159,747
Rp21,390 Rp44,710,041,516
Rp21,390 Rp28,441,959,583
Rp21,390 Rp3,655,954,202
Rp21,390 Rp12,740,625,591
Rp21,390 Rp3,839,215,807
Rp21,390 Rp11,186,956,112
Rp21,390 Rp19,246,835,153
Rp21,390 Rp4,147,821,590
Rp21,390 Rp510,173,429
Rp21,390 Rp3,223,483,603
Rp21,390 Rp1,659,450,831
Rp21,390 Rp552,442,674
Rp21,390 Rp617,705,318
Rp21,390 Rp1,209,950,547
Rp21,390 Rp339,662,206
Rp21,390 Rp127,790,307
Rp21,390 Rp182,360,030
Rp21,390 Rp138,457,911
Rp14,580 Rp3,585,038,511
Rp14,580 Rp10,045,475,732
Rp14,580 Rp2,528,640,983
Rp14,580 Rp2,619,739,014
Rp14,580 Rp887,236,437
Rp14,580 Rp2,941,740,561
Rp14,580 Rp5,140,401,816
Rp14,580 Rp8,899,801,160
Rp14,580 Rp4,644,384,442
Rp14,580 Rp2,294,507,370
Rp14,580 Rp10,664,338,122
Rp14,580 Rp560,138,446
Rp14,580 Rp363,742,128
Rp14,580 Rp1,259,367,058
Rp14,580 Rp2,925,987,779
Rp14,580 Rp4,499,814,417
Rp14,580 Rp10,816,313,970
Rp14,580 Rp4,412,035,486
Rp14,580 Rp3,441,792,878
Rp14,580 Rp1,991,400,418
Rp14,580 Rp591,714,234
Rp14,580 Rp616,974,202
Rp14,580 Rp1,165,335,224
Rp14,580 Rp2,757,523,239
Rp14,580 Rp8,536,157,699
Rp14,580 Rp2,241,740,969
Rp14,580 Rp12,401,511,743
Rp14,580 Rp5,268,158,799
Rp14,580 Rp7,708,236,981
Rp14,580 Rp364,536,030
Rp14,580 Rp1,186,495,519
Rp14,580 Rp853,576,988
Rp14,580 Rp1,341,372,057
Rp14,580 Rp983,382,107
Rp14,580 Rp1,008,884,899
Rp14,580 Rp2,238,777,753
Rp14,580 Rp890,339,804
Rp14,580 Rp30,678,632,073
Rp14,580 Rp19,589,869,353
Rp14,580 Rp2,599,016,880
Rp14,580 Rp8,791,373,535
Rp14,580 Rp2,723,932,925
Rp14,580 Rp7,732,350,580
Rp14,580 Rp13,273,739,688
Rp14,580 Rp2,860,106,582
Rp14,580 Rp380,587,640
Rp14,580 Rp2,230,052,920
Rp14,580 Rp1,163,966,065
Rp14,580 Rp409,399,496
Rp14,580 Rp453,884,271
Rp14,580 Rp857,574,568
Rp14,580 Rp264,362,598
Rp14,580 Rp119,945,007
Rp14,580 Rp157,141,200
Rp14,580 Rp127,216,333
pekerjaan ke Quarry
n-Angkut-Padatkan)
Rp0 Rp0
Rp0 Rp0
Rp0 Rp0
Rp0 Rp0
Rp0 Rp0
Rp0 Rp0
Rp0 Rp0
Rp0 Rp0
Rp0 Rp0
Rp0 Rp0
Rp0 Rp0
Rp0 Rp0
Rp0 Rp0
Rp0 Rp0
Rp0 Rp0
Rp0 Rp0
Rp0 Rp0
Rp0 Rp0
Rp0 Rp0
Rp0 Rp0
Rp0 Rp0
Rp0 Rp0
Rp0 Rp0
Rp0 Rp0
Rp0 Rp0
Rp0 Rp0
Rp0 Rp0
Rp0 Rp0
Rp0 Rp0
Rp0 Rp0
Rp0 Rp0
Rp0 Rp0
Rp0 Rp0
Rp0 Rp0
Rp0 Rp0
Rp0 Rp0
Rp0 Rp0
Rp0 Rp0
Rp0 Rp0
Rp0 Rp0
Rp0 Rp0
Rp0 Rp0
Rp0 Rp0
Rp0 Rp0
Rp0 Rp0
Rp0 Rp0
Rp0 Rp0
Rp0 Rp0
Rp0 Rp0
Rp0 Rp0
Rp0 Rp0
Rp0 Rp0
Rp0 Rp0
Rp0 Rp0
Rp0 Rp0
Rp8,625 Rp2,120,778,954
Rp8,625 Rp5,942,539,656
Rp8,625
Rp8,625 Rp1,495,852,433
Rp8,625 Rp1,549,742,730
Rp8,625 Rp524,856,946
Rp8,625 Rp1,740,227,184
Rp8,625 Rp3,040,875,560
Rp8,625 Rp5,264,800,069
Rp8,625 Rp2,747,449,644
Rp8,625 Rp1,357,347,467
Rp8,625 Rp6,308,636,235
Rp8,625 Rp331,357,620
Rp8,625 Rp215,176,670
Rp8,625 Rp744,995,945
Rp8,625 Rp1,730,908,408
Rp8,625 Rp2,661,927,253
Rp8,625 Rp6,398,539,643
Rp8,625 Rp2,610,000,416
Rp8,625 Rp2,036,040,025
Rp8,625 Rp1,178,040,371
Rp8,625 Rp350,036,712
Rp8,625 Rp364,979,595
Rp8,625 Rp689,370,117
Rp8,625 Rp1,631,250,887
Rp8,625 Rp5,049,681,767
Rp8,625 Rp1,326,132,775
Rp8,625 Rp7,336,285,239
Rp8,625 Rp3,116,451,965
Rp8,625 Rp4,559,913,852
Rp8,625 Rp215,646,314
Rp8,625 Rp701,887,781
Rp8,625 Rp504,945,235
Rp8,625 Rp793,507,133
Rp8,625 Rp581,733,242
Rp8,625 Rp596,819,771
Rp8,625 Rp1,324,379,843
Rp8,625 Rp526,692,785
Rp8,625 Rp18,148,367,739
Rp8,625 Rp11,588,657,282
Rp8,625 Rp1,537,484,265
Rp8,625 Rp5,200,658,213
Rp8,625 Rp1,611,380,074
Rp8,625 Rp4,574,178,584
Rp8,625 Rp7,852,263,704
Rp8,625 Rp1,691,935,478
Rp8,625 Rp225,141,865
Rp8,625 Rp1,319,218,548
Rp8,625 Rp688,560,172
Rp8,625 Rp242,185,916
Rp8,625 Rp268,501,498
Rp8,625 Rp507,310,058
Rp8,625 Rp156,387,340
Rp8,625 Rp70,955,122
Rp8,625 Rp92,959,043
Rp8,625 Rp75,256,575
l Rp696,764,451,048
Rp14,580 Rp5,174,465,270
Rp14,580 Rp11,624,097,115
Rp14,580 Rp4,742,637,269
Rp14,580 Rp5,426,784,692
Rp14,580 Rp1,705,562,970
Rp14,580 Rp6,138,970,594
Rp14,580 Rp10,322,856,638
Rp14,580 Rp18,386,708,662
Rp14,580 Rp8,205,236,237
Rp14,580 Rp3,378,769,706
Rp14,580 Rp30,146,828,079
Rp14,580 Rp957,006,426
Rp14,580 Rp656,690,179
Rp14,580 Rp2,303,035,728
Rp14,580 Rp5,559,505,001
Rp14,580 Rp8,447,347,394
Rp14,580 Rp14,133,329,590
Rp14,580 Rp9,655,975,797
Rp14,580 Rp7,902,559,105
Rp14,580 Rp4,134,309,724
Rp14,580 Rp1,156,842,442
Rp14,580 Rp2,287,230,332
Rp14,580 Rp4,966,853,981
Rp14,580 Rp8,608,068,380
Rp14,580 Rp13,053,338,506
Rp14,580 Rp8,003,618,733
Rp14,580 Rp21,675,536,394
Rp14,580 Rp8,710,982,028
Rp14,580 Rp9,171,788,590
Rp14,580 Rp1,036,402,571
Rp14,580 Rp5,376,623,078
Rp14,580 Rp2,666,969,899
Rp14,580 Rp5,957,249,359
Rp14,580 Rp3,210,161,376
Rp14,580 Rp5,709,630,969
Rp14,580 Rp9,495,518,855
Rp14,580 Rp2,803,140,454
Rp14,580 Rp35,955,193,108
Rp14,580 Rp23,280,516,525
Rp14,580 Rp3,536,524,278
Rp14,580 Rp6,595,057,990
Rp14,580 Rp4,624,502,760
Rp14,580 Rp6,141,348,481
Rp14,580 Rp17,695,849,145
Rp14,580 Rp16,169,141,161
Rp14,580 Rp1,769,173,940
Rp14,580 Rp10,615,062,641
Rp14,580 Rp7,205,495,453
Rp14,580 Rp1,508,157,420
Rp14,580 Rp2,697,417,387
Rp14,580 Rp3,341,395,667
Rp14,580 Rp1,456,399,501
Rp14,580 Rp319,495,483
Rp14,580 Rp456,202,711
Rp14,580 Rp272,855,007
Rp74,290 Rp26,365,639,570
Rp74,290 Rp59,228,681,393
Rp74,290 Rp24,165,330,773
Rp74,290 Rp27,651,291,824
Rp74,290 Rp8,690,416,532
Rp74,290 Rp31,280,118,343
Rp74,290 Rp52,598,423,844
Rp74,290 Rp93,686,459,982
Rp74,290 Rp41,808,436,216
Rp74,290 Rp17,215,967,178
Rp74,290 Rp153,608,220,714
Rp74,290 Rp4,876,269,368
Rp74,290 Rp3,346,057,161
Rp74,290 Rp11,734,741,030
Rp74,290 Rp28,327,546,399
Rp74,290 Rp43,042,073,931
Rp74,290 Rp72,014,064,144
Rp74,290 Rp49,200,441,833
Rp74,290 Rp40,266,194,509
Rp74,290 Rp21,065,697,490
Rp74,290 Rp5,894,501,032
Rp74,290 Rp11,654,207,224
Rp74,290 Rp25,307,790,277
Rp74,290 Rp43,861,001,367
Rp74,290 Rp66,511,146,614
Rp74,290 Rp40,781,127,277
Rp74,290 Rp110,444,142,574
Rp74,290 Rp44,385,380,993
Rp74,290 Rp46,733,345,293
Rp74,290 Rp5,280,819,408
Rp74,290 Rp27,395,701,540
Rp74,290 Rp13,589,107,940
Rp74,290 Rp30,354,187,576
Rp74,290 Rp16,356,851,073
Rp74,290 Rp29,092,488,662
Rp74,290 Rp48,382,859,791
Rp74,290 Rp14,282,942,685
Rp74,290 Rp183,203,792,590
Rp74,290 Rp118,622,055,737
Rp74,290 Rp18,019,779,742
Rp74,290 Rp33,604,036,904
Rp74,290 Rp23,563,395,750
Rp74,290 Rp31,292,234,476
Rp74,290 Rp90,166,298,559
Rp74,290 Rp82,387,208,289
Rp74,290 Rp9,014,535,800
Rp74,290 Rp54,087,311,633
Rp74,290 Rp36,714,420,933
Rp74,290 Rp7,684,568,912
Rp74,290 Rp13,744,248,126
Rp74,290 Rp17,025,533,889
Rp74,290 Rp7,420,844,918
Rp74,290 Rp1,627,936,862
Rp74,290 Rp2,324,506,130
Rp74,290 Rp1,390,287,962
Rp65,230 Rp23,150,231,110
Rp65,230 Rp52,005,477,013
Rp65,230 Rp21,218,259,878
Rp65,230 Rp24,279,092,283
Rp65,230 Rp7,630,581,106
Rp65,230 Rp27,465,367,069
Rp65,230 Rp46,183,809,225
Rp65,230 Rp82,260,974,352
Rp65,230 Rp36,709,709,172
Rp65,230 Rp15,116,402,464
Rp65,230 Rp134,875,006,558
Rp65,230 Rp4,281,586,363
Rp65,230 Rp2,937,990,424
Rp65,230 Rp10,303,636,524
Rp65,230 Rp24,872,874,567
Rp65,230 Rp37,792,899,213
Rp65,230 Rp63,231,624,769
Rp65,230 Rp43,200,226,420
Rp65,230 Rp35,355,550,785
Rp65,230 Rp18,496,640,831
Rp65,230 Rp5,175,640,090
Rp65,230 Rp10,232,924,179
Rp65,230 Rp22,221,391,301
Rp65,230 Rp38,511,954,761
Rp65,230 Rp58,399,812,810
Rp65,230 Rp35,807,685,183
Rp65,230 Rp96,974,982,099
Rp65,230 Rp38,972,383,930
Rp65,230 Rp41,034,003,412
Rp65,230 Rp4,636,799,703
Rp65,230 Rp24,054,672,384
Rp65,230 Rp11,931,855,040
Rp65,230 Rp26,652,357,728
Rp65,230 Rp14,362,059,436
Rp65,230 Rp25,544,528,677
Rp65,230 Rp42,482,352,190
Rp65,230 Rp12,541,073,513
Rp65,230 Rp160,861,265,186
Rp65,230 Rp104,155,561,929
Rp65,230 Rp15,822,186,467
Rp65,230 Rp29,505,873,297
Rp65,230 Rp20,689,733,541
Rp65,230 Rp27,476,005,585
Rp65,230 Rp79,170,112,465
Rp65,230 Rp72,339,717,280
Rp65,230 Rp7,915,172,570
Rp65,230 Rp47,491,120,445
Rp65,230 Rp32,236,931,989
Rp65,230 Rp6,747,401,132
Rp65,230 Rp12,068,075,182
Rp65,230 Rp14,949,193,372
Rp65,230 Rp6,515,839,467
Rp65,230 Rp1,429,402,632
Rp65,230 Rp2,041,022,141
Rp65,230 Rp1,220,736,085
Rp4,402,444,858,885
Rp13,419 Rp4,996,631
Rp13,419 Rp4,094,557
Rp13,419 Rp9,110,820
Rp13,419 Rp3,276,451
Rp13,419 Rp3,374,434
Rp13,419 Rp41,303
Rp24,894,196
Rp13,419 Rp146,969,431
Rp13,419 Rp179,976,038
Rp13,419 Rp71,117,947
Rp13,419 Rp123,773,261
Rp13,419 Rp75,692,522
Rp13,419 Rp1,030,397
Rp598,559,596
Rp13,419 Rp109,315,417
Rp13,419 Rp179,006,367
Rp13,419 Rp43,822,678
Rp13,419 Rp120,136,316
Rp13,419 Rp71,087,107
Rp13,419 Rp883,120
Rp524,251,005
Rp13,419 Rp124,060,004
Rp13,419 Rp145,244,011
Rp13,419 Rp89,571,613
Rp13,419 Rp96,838,908
Rp13,419 Rp68,444,262
Rp13,419 Rp793,449
Rp524,952,247
Rp13,419 Rp97,940,343
Rp13,419 Rp123,260,914
Rp13,419 Rp73,795,508
Rp13,419 Rp87,777,201
Rp13,419 Rp58,757,873
Rp13,419 Rp732,582
Rp442,264,420
Rp13,419 Rp61,358,077
Rp13,419 Rp75,802,796
Rp13,419 Rp41,659,190
Rp13,419 Rp53,307,910
Rp13,419 Rp35,957,146
Rp13,419 Rp442,919
Rp268,528,037
Rp13,419 Rp3,418,354
Rp13,419 Rp5,481,383
Rp13,419 Rp3,387,447
Rp13,419 Rp3,898,409
Rp13,419 Rp2,805,212
Rp13,419 Rp22,825
Rp19,013,630
Rp13,419 Rp207,319
Rp13,419 Rp130,833
Rp13,419 Rp2,401,843
Rp13,419 Rp130,833
Rp13,419 Rp633,579
Rp13,419 Rp2,174
Rp3,506,580
Rp13,419 Rp2,005,093
Rp13,419 Rp3,072,050
Rp13,419 Rp2,354,252
Rp13,419 Rp2,350,357
Rp13,419 Rp1,582,497
Rp13,419 Rp19,565
Rp2,417,353,527 Rp11,383,815
Rp84,112 Rp31,319,989
Rp84,112 Rp25,665,590
Rp84,112 Rp57,108,635
Rp84,112 Rp20,537,519
Rp84,112 Rp21,151,701
Rp84,112 Rp258,895
Rp156,042,329
Rp84,112 Rp921,236,908
Rp84,112 Rp1,128,129,625
Rp84,112 Rp445,783,024
Rp84,112 Rp775,838,181
Rp84,112 Rp474,457,476
Rp84,112 Rp6,458,758
Rp3,751,903,972
Rp84,112 Rp685,213,215
Rp84,112 Rp1,122,051,514
Rp84,112 Rp274,690,239
Rp84,112 Rp753,041,006
Rp84,112 Rp445,589,717
Rp84,112 Rp5,535,592
Rp3,286,121,282
Rp84,112 Rp777,635,549
Rp84,112 Rp910,421,592
Rp84,112 Rp561,454,687
Rp84,112 Rp607,007,699
Rp84,112 Rp429,023,777
Rp84,112 Rp4,973,516
Rp3,290,516,821
Rp84,112 Rp613,911,740
Rp84,112 Rp772,626,676
Rp84,112 Rp462,566,570
Rp84,112 Rp550,206,913
Rp84,112 Rp368,307,346
Rp84,112 Rp4,591,986
Rp2,772,211,231
Rp84,112 Rp384,606,000
Rp84,112 Rp475,148,694
Rp84,112 Rp261,129,020
Rp84,112 Rp334,145,774
Rp84,112 Rp225,387,345
Rp84,112 Rp2,776,312
Rp1,683,193,144
Rp84,112 Rp21,426,998
Rp84,112 Rp34,358,519
Rp84,112 Rp21,233,270
Rp84,112 Rp24,436,089
Rp84,112 Rp17,583,689
Rp84,112 Rp143,074
Rp119,181,640
Rp84,112 Rp1,299,524
Rp84,112 Rp820,088
Rp84,112 Rp15,055,286
Rp84,112 Rp820,088
Rp84,112 Rp3,971,411
Rp84,112 Rp13,626
Rp21,980,022
Rp84,112 Rp12,568,369
Rp84,112 Rp19,256,289
Rp84,112 Rp14,756,972
Rp84,112 Rp14,732,560
Rp84,112 Rp9,919,444
Rp84,112 Rp122,635
Rp15,152,506,711 Rp71,356,269
Rp118,885 Rp1,668,820,097
Rp118,885 Rp1,037,018,001
Rp118,885 Rp460,620,142
Rp118,885 Rp940,693,231
Rp118,885 Rp487,325,049
Rp118,885 Rp563,622,863
Rp118,885
Rp118,885 Rp1,291,742,256
Rp118,885 Rp659,894,934
Rp118,885 Rp732,410,803
Rp118,885 Rp110,673,884
Rp118,885 Rp526,736,209
Rp118,885 Rp246,764,724
Rp118,885 Rp139,523,643
Rp118,885 Rp210,498,356
Rp118,885 Rp505,906,948
Rp118,885 Rp707,840,049
Rp118,885 Rp161,324,740
Rp118,885 Rp1,050,861,228
Rp118,885 Rp710,586,882
Rp118,885 Rp270,041,880
Rp118,885 Rp4,975,318,659
Rp17,458,224,576
Rp154,100 Rp8,414,790,092
Rp154,100 Rp4,422,500,835
Rp154,100 Rp2,390,079,994
Rp154,100 Rp4,035,597,565
Rp154,100 Rp2,398,262,855
Rp154,100 Rp2,836,575,097
Rp154,100 Rp6,634,970,329
Rp154,100 Rp3,401,777,953
Rp154,100 Rp3,848,700,021
Rp154,100 Rp593,336,761
Rp154,100 Rp2,731,727,041
Rp154,100 Rp1,219,622,582
Rp154,100 Rp728,110,265
Rp154,100 Rp1,386,351,894
Rp154,100 Rp3,051,916,167
Rp154,100 Rp3,593,885,853
Rp154,100 Rp955,009,215
Rp154,100 Rp6,697,630,029
Rp154,100 Rp4,984,832,275
Rp154,100 Rp1,726,703,679
Rp154,100 Rp29,549,597,054
Rp95,601,977,556
Rp113,060,202,133
Rp0
m Rp0
Rp3,676,713,639
Rp623,807,860
Rp343,338,616
Rp15,840,276
Rp19,539,345
Rp9,511,898
Rp6,488,848
Rp10,607,266
Rp8,845,990
Rp10,470,648
Rp0
Rp0
Rp0
of PLN Rp4,725,164,386
Rp0
Rp3,000,000 Rp2,269,710,000
Rp3,000,000 Rp8,072,700,000
Rp3,000,000 Rp7,781,400,000
Rp3,000,000 Rp3,180,240,000
Rp3,000,000 Rp2,800,620,000
Rp3,000,000 Rp4,415,520,000
Rp28,520,190,000
Rp0
Rp0
Rp530,731 Rp22,495,032,587
Rp1,291,186 Rp36,153,194
Rp22,531,185,781
Rp0
Rp5,296,357,809,996
SCOPE OF WORK
ONSHORE LAND PREPARATION STUDY, NGRR LOCATION PLAN FOR KULA TANJUNG BATU BARA REGENCY - SUMATERA UTRA PROVINCE
Month
No. Item Satuan Volume
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
I Land Clearing
1.1 Demolition of Palm Oil Tree
1.1.1 Dusun I Kuala Tanjung m3 4,742.8 4,742.8
1.1.2 Dusun I Kuala Indah m3 13,963.6 13,963.6
1.1.3 Dusun II Kuala Indah m3 11,593.6 11,593.6
1.1.4 Dusun IV Kuala Indah m3 23,885.9 23,885.9
1.1.5 Dusun VI Suka Ramai m3 22,402.6 22,402.6
1.1.6 Dusun VII Suka Ramai m3 14,974.6 14,974.6
1.1.7 Desa Tanjung Harapan m3 27,855.1 27,855.1
1.1.8 Desa Aras m3 29,360.8 29,360.8
1.1.9 Desa Pematang Kruing m3 10,602.1 10,602.1
1.1.10 Desa Gambus Laut m3 24,776.2 24,776.2
1.2 Stripping /Cutting Top Soil
1.2.1 Dusun I Kuala Tanjung
1. KT-D1-01 m3 245887.415 15404.927561561 15404.9275616 15404.9275616 15404.9275616 15404.9275616 15404.9275616 15404.9275616 15404.9275616 15404.9275616 15404.9275616 15404.9275616 15404.9275616 15404.9275616 17496.02924684 20080.578637608 8046.7488152566
2. KT-D1-02 m3 688990.10508734 43165.457083287 43165.4570833 43165.4570833 43165.4570833 43165.4570833 43165.4570833 43165.4570833 43165.4570833 43165.4570833 43165.4570833 43165.4570833 43165.4570833 43165.4570833 45256.558768566 46491.755997675 36090.848238368
1.2.2 Dusun I Kuala Indah
1. KI-D1-01 m3 173432.16615457 10865.582349775 10865.5823498 10865.5823498 10865.5823498 10865.5823498 10865.5823498 10865.5823498 10865.5823498 10865.5823498 10865.5823498 10865.5823498 10865.5823498 10865.5823498 12956.684035054 14191.881264163 5031.0303082785
2. KI-D1-02 m3 179680.31649032 11257.031026869 11257.0310269 11257.0310269 11257.0310269 11257.0310269 11257.0310269 11257.0310269 11257.0310269 11257.0310269 11257.0310269 11257.0310269 11257.0310269 11257.0310269 13348.132712148 14583.329941258 5407.4504876085
3 KI-D1-03 m3 60852.9792 3812.459195934 3812.45919593 3812.45919593 3812.45919593 3812.45919593 3812.45919593 3812.45919593 3812.45919593 3812.45919593 3812.45919593 3812.45919593 3812.45919593 3812.45919593 5903.560881213 5387.4487716451
4. KI-D1-04 m3 201765.4705871 12640.673207364 12640.6732074 12640.6732074 12640.6732074 12640.6732074 12640.6732074 12640.6732074 12640.6732074 12640.6732074 12640.6732074 12640.6732074 12640.6732074 12640.6732074 14731.774892643 15966.972121753 6737.9718769678
5. KI-D1-05 m3 352565.28227026 22088.331092889 22088.3310929 22088.3310929 22088.3310929 22088.3310929 22088.3310929 22088.3310929 22088.3310929 22088.3310929 22088.3310929 22088.3310929 22088.3310929 22088.3310929 24179.432778168 25414.630007277 15822.91527725
1.2.3 Dusun II Kuala Indah
1. KI-D2-01 m3 610411.60220723 38242.487988817 38242.4879888 38242.4879888 38242.4879888 38242.4879888 38242.4879888 38242.4879888 38242.4879888 38242.4879888 38242.4879888 38242.4879888 38242.4879888 38242.4879888 40333.589674096 41568.786903206 31356.881775302
2. KI-D2-02 m3 318544.88630443 19956.94207703 19956.942077 19956.942077 19956.942077 19956.942077 19956.942077 19956.942077 19956.942077 19956.942077 19956.942077 19956.942077 19956.942077 19956.942077 22048.043762309 23283.240991418 13773.354549323
3. KI-D2-03 m3 157373.61933211 9859.5091005853 9859.50910059 9859.50910059 9859.50910059 9859.50910059 9859.50910059 9859.50910059 9859.50910059 9859.50910059 9859.50910059 9859.50910059 9859.50910059 9859.50910059 11950.610785864 13185.808014974 4063.5822236658
1.2.4 Dusun IV Kuala Indah
1. KI-D4-01 m3 731436.0851685 45824.711719926 45824.7117199 45824.7117199 45824.7117199 45824.7117199 45824.7117199 45824.7117199 45824.7117199 45824.7117199 45824.7117199 45824.7117199 45824.7117199 45824.7117199 47915.813405205 49151.010634314 38648.008769954
2. KI-D4-02 m3 38418.27475 2406.9175706447 2406.91757064 2406.91757064 2406.91757064 2406.91757064 2406.91757064 2406.91757064 2406.91757064 2406.91757064 2406.91757064 2406.91757064 2406.91757064 2406.91757064 4498.0192559237 2630.3270756953
3 KI-D4-03 m3 24948.01975 1563.001656889 1563.00165689 1563.00165689 1563.00165689 1563.00165689 1563.00165689 1563.00165689 1563.00165689 1563.00165689 1563.00165689 1563.00165689 1563.00165689 1563.00165689 3654.103342168 974.89486827533
4. KI-D4-04 m3 86376.341431077 5411.5062488189 5411.50624882 5411.50624882 5411.50624882 5411.50624882 5411.50624882 5411.50624882 5411.50624882 5411.50624882 5411.50624882 5411.50624882 5411.50624882 5411.50624882 7502.6079340979 8524.152262334
5. KI-D4-05 m3 200685.03283161 12572.983426014 12572.983426 12572.983426 12572.983426 12572.983426 12572.983426 12572.983426 12572.983426 12572.983426 12572.983426 12572.983426 12572.983426 12572.983426 14664.085111293 15899.282340402 6672.8808417298
6. KI-D4-06 m3 308629.24672236 19335.723990336 19335.7239903 19335.7239903 19335.7239903 19335.7239903 19335.7239903 19335.7239903 19335.7239903 19335.7239903 19335.7239903 19335.7239903 19335.7239903 19335.7239903 21426.825675615 22662.022904724 13175.986267657
7. KI-D4-07 m3 741859.66873854 46477.752664816 46477.7526648 46477.7526648 46477.7526648 46477.7526648 46477.7526648 46477.7526648 46477.7526648 46477.7526648 46477.7526648 46477.7526648 46477.7526648 46477.7526648 48568.854350095 49804.051579204 39275.978166633
8. KI-D4-08 m3 302608.743911 18958.537505647 18958.5375056 18958.5375056 18958.5375056 18958.5375056 18958.5375056 18958.5375056 18958.5375056 18958.5375056 18958.5375056 18958.5375056 18958.5375056 18958.5375056 21049.639190926 22284.836420035 12813.280726635
9. KI-D4-09 m3 236062.6116484 14789.400394634 14789.4003946 14789.4003946 14789.4003946 14789.4003946 14789.4003946 14789.4003946 14789.4003946 14789.4003946 14789.4003946 14789.4003946 14789.4003946 14789.4003946 16880.502079913 18115.699309022 8804.2051292223
10. KI-D4-10 m3 136584.39079278 8557.0570832293 8557.05708323 8557.05708323 8557.05708323 8557.05708323 8557.05708323 8557.05708323 8557.05708323 8557.05708323 8557.05708323 8557.05708323 8557.05708323 8557.05708323 10648.158768508 11883.355997618 2811.1339446704
11. KI-D4-11 m3 40583.966647836 2542.5988815683 2542.59888157 2542.59888157 2542.59888157 2542.59888157 2542.59888157 2542.59888157 2542.59888157 2542.59888157 2542.59888157 2542.59888157 2542.59888157 2542.59888157 4633.7005668473 2896.4806206004
12. KI-D4-12 m3 42316.474727721 2651.1410835775 2651.14108358 2651.14108358 2651.14108358 2651.14108358 2651.14108358 2651.14108358 2651.14108358 2651.14108358 2651.14108358 2651.14108358 2651.14108358 2651.14108358 4742.2427688565 3109.3978723567
13. KI-D4-13 m3 79926.970086721 5007.4510092393 5007.45100924 5007.45100924 5007.45100924 5007.45100924 5007.45100924 5007.45100924 5007.45100924 5007.45100924 5007.45100924 5007.45100924 5007.45100924 5007.45100924 7098.5526945183 7731.5542720912
14. KI-D4-14 m3 189130.53764804 11849.090495938 11849.0904959 11849.0904959 11849.0904959 11849.0904959 11849.0904959 11849.0904959 11849.0904959 11849.0904959 11849.0904959 11849.0904959 11849.0904959 11849.0904959 13940.192181217 15175.389410326 5976.7796093083
15. KI-D4-15 m3 585470.34975 36679.91030505 36679.9103051 36679.9103051 36679.9103051 36679.9103051 36679.9103051 36679.9103051 36679.9103051 36679.9103051 36679.9103051 36679.9103051 36679.9103051 36679.9103051 38771.011990329 40006.209219438 29854.294574582
16. KI-D4-16 m3 153754.52459326 9632.7716228234 9632.77162282 9632.77162282 9632.77162282 9632.77162282 9632.77162282 9632.77162282 9632.77162282 9632.77162282 9632.77162282 9632.77162282 9632.77162282 9632.77162282 11723.873308103 12959.070537212 3845.549651239
1.2.5 Dusun VI Suka Ramai
1. SR-D6-01 m3 850583.79582685 53289.355047921 53289.3550479 53289.3550479 53289.3550479 53289.3550479 53289.3550479 53289.3550479 53289.3550479 53289.3550479 53289.3550479 53289.3550479 53289.3550479 53289.3550479 55380.4567332 56615.653962309 45826.069508376
2. SR-D6-02 m3 361327.764 22637.303460207 22637.3034602 22637.3034602 22637.3034602 22637.3034602 22637.3034602 22637.3034602 22637.3034602 22637.3034602 22637.3034602 22637.3034602 22637.3034602 22637.3034602 24728.405145486 25963.602374595 16350.811497227
3 SR-D6-03 m3 528685.664 33122.331034127 33122.3310341 33122.3310341 33122.3310341 33122.3310341 33122.3310341 33122.3310341 33122.3310341 33122.3310341 33122.3310341 33122.3310341 33122.3310341 33122.3310341 35213.432719407 36448.629948516 26433.297888422
1.2.6 Dusun VII Suka Ramai
1. SR-D7-01 m3 25002.471170802 1566.4130563422 1566.41305634 1566.41305634 1566.41305634 1566.41305634 1566.41305634 1566.41305634 1566.41305634 1566.41305634 1566.41305634 1566.41305634 1566.41305634 1566.41305634 3657.5147416212 981.58669673259
2. SR-D7-02 m3 81378.293475796 5098.3768977282 5098.37689773 5098.37689773 5098.37689773 5098.37689773 5098.37689773 5098.37689773 5098.37689773 5098.37689773 5098.37689773 5098.37689773 5098.37689773 5098.37689773 7189.4785830072 7909.9152223224
3 SR-D7-03 m3 58544.375062697 3667.8243861229 3667.82438612 3667.82438612 3667.82438612 3667.82438612 3667.82438612 3667.82438612 3667.82438612 3667.82438612 3667.82438612 3667.82438612 3667.82438612 3667.82438612 5758.9260714019 5103.7319716977
4. SR-D7-04 m3 92000.826984799 5763.8821218425 5763.88212184 5763.88212184 5763.88212184 5763.88212184 5763.88212184 5763.88212184 5763.88212184 5763.88212184 5763.88212184 5763.88212184 5763.88212184 5763.88212184 7854.9838071215 9090.1810362306 125.19455749539
5. SR-D7-05 m3 67447.332443237 4225.5975992451 4225.59759925 4225.59759925 4225.59759925 4225.59759925 4225.59759925 4225.59759925 4225.59759925 4225.59759925 4225.59759925 4225.59759925 4225.59759925 4225.59759925 6316.6992845242 6197.8643685256
6. SR-D7-06 m3 69196.495148997 4335.1832190526 4335.18321905 4335.18321905 4335.18321905 4335.18321905 4335.18321905 4335.18321905 4335.18321905 4335.18321905 4335.18321905 4335.18321905 4335.18321905 4335.18321905 6426.2849043316 4335.1832190526 2077.6451779294
7. SR-D7-07 m3 153551.28620197 9620.0386706489 9620.03867065 9620.03867065 9620.03867065 9620.03867065 9620.03867065 9620.03867065 9620.03867065 9620.03867065 9620.03867065 9620.03867065 9620.03867065 9620.03867065 11711.140355928 9620.0386706489 7159.6044569576
8. SR-D7-08 m3 61065.830197182 3825.7943810348 3825.79438103 3825.79438103 3825.79438103 3825.79438103 3825.79438103 3825.79438103 3825.79438103 3825.79438103 3825.79438103 3825.79438103 3825.79438103 3825.79438103 5916.8960663138 3825.7943810348 1587.8127963803
1.2.7 Desa Tanjung Harapan
1. TH-D0-01 m3 2104158.5783984 131826.22818767 131826.228188 131826.228188 131826.228188 131826.228188 131826.228188 131826.228188 131826.228188 131826.228188 131826.228188 131826.228188 131826.228188 131826.228188 133917.32987295 131826.22818767 124674.05389816
2. TH-D0-02 m3 1343612.4384866 84177.761947266 84177.7619473 84177.7619473 84177.7619473 84177.7619473 84177.7619473 84177.7619473 84177.7619473 84177.7619473 84177.7619473 84177.7619473 84177.7619473 84177.7619473 86268.863632545 84177.761947266 78854.90759233
1.2.8 Desa Aras
1. AR-D0-01 m3 178259.04525 11167.987915402 11167.9879154 11167.9879154 11167.9879154 11167.9879154 11167.9879154 11167.9879154 11167.9879154 11167.9879154 11167.9879154 11167.9879154 11167.9879154 11167.9879154 13259.089600681 11167.987915402 8648.1248336991
2. AR-D0-02 m3 602974.86525 37776.573968287 37776.5739683 37776.5739683 37776.5739683 37776.5739683 37776.5739683 37776.5739683 37776.5739683 37776.5739683 37776.5739683 37776.5739683 37776.5739683 37776.5739683 39867.675653566 37776.573968287 34235.154040418
3 AR-D0-03 m3 186826.67525 11704.752757654 11704.7527577 11704.7527577 11704.7527577 11704.7527577 11704.7527577 11704.7527577 11704.7527577 11704.7527577 11704.7527577 11704.7527577 11704.7527577 11704.7527577 13795.854442933 11704.752757654 9164.2821999172
4. AR-D0-04 m3 530339.54598389 33225.947285318 33225.9472853 33225.9472853 33225.9472853 33225.9472853 33225.9472853 33225.9472853 33225.9472853 33225.9472853 33225.9472853 33225.9472853 33225.9472853 33225.9472853 35317.048970597 33225.947285318 29859.235018844
1.2.9 Desa Pematang Kuing
1. PK-D0-01 m3 910407.386 57037.322682173 57037.3226822 57037.3226822 57037.3226822 57037.3226822 57037.3226822 57037.3226822 57037.3226822 57037.3226822 57037.3226822 57037.3226822 57037.3226822 57037.3226822 59128.424367452 57037.322682173 52756.444082134
1.2.10 Desa Gambus Laut
1. GB-D0-01 m3 196166.43227006 12289.891612103 12289.8916121 12289.8916121 12289.8916121 12289.8916121 12289.8916121 12289.8916121 12289.8916121 12289.8916121 12289.8916121 12289.8916121 12289.8916121 12289.8916121 14380.993297382 12289.891612103 9726.9564032373
2. GB-D0-02 m3 26103.404657798 1635.3869020239 1635.38690202 1635.38690202 1635.38690202 1635.38690202 1635.38690202 1635.38690202 1635.38690202 1635.38690202 1635.38690202 1635.38690202 1635.38690202 1635.38690202 3726.4885873029 1116.8863441855
3 GB-D0-03 m3 152952.87517406 9582.5480225935 9582.54802259 9582.54802259 9582.54802259 9582.54802259 9582.54802259 9582.54802259 9582.54802259 9582.54802259 9582.54802259 9582.54802259 9582.54802259 9582.54802259 11673.649707873 9582.5480225935 7123.5531498769
4. GB-D0-04 m3 79833.063454546 5001.5677277944 5001.56772779 5001.56772779 5001.56772779 5001.56772779 5001.56772779 5001.56772779 5001.56772779 5001.56772779 5001.56772779 5001.56772779 5001.56772779 5001.56772779 7092.6694130734 5001.5677277944 2718.4458523505
5. GB-D0-05 m3 28079.526454546 1759.1915836572 1759.19158366 1759.19158366 1759.19158366 1759.19158366 1759.19158366 1759.19158366 1759.19158366 1759.19158366 1759.19158366 1759.19158366 1759.19158366 1759.19158366 3850.2932689362 1359.7425980663
6. GB-D0-06 m3 31130.608454546 1950.3428761883 1950.34287619 1950.34287619 1950.34287619 1950.34287619 1950.34287619 1950.34287619 1950.34287619 1950.34287619 1950.34287619 1950.34287619 1950.34287619 1950.34287619 4041.4445614673 1734.7065026308
7. GB-D0-07 m3 58818.557454546 3685.0020033063 3685.00200331 3685.00200331 3685.00200331 3685.00200331 3685.00200331 3685.00200331 3685.00200331 3685.00200331 3685.00200331 3685.00200331 3685.00200331 3685.00200331 5776.1036885853 5137.4277229789
8. GB-D0-08 m3 18131.865454546 1135.9673445802 1135.96734458 1135.96734458 1135.96734458 1135.96734458 1135.96734458 1135.96734458 1135.96734458 1135.96734458 1135.96734458 1135.96734458 1135.96734458 1135.96734458 3227.0690298592 137.22094514329
9. GB-D0-09 m3 8226.6808545455 515.40426595788 515.404265958 515.404265958 515.404265958 515.404265958 515.404265958 515.404265958 515.404265958 515.404265958 515.404265958 515.404265958 515.404265958 515.404265958 1526.4253970931
10. GB-D0-10 m3 10777.860054546 675.23648336747 675.236483367 675.236483367 675.236483367 675.236483367 675.236483367 675.236483367 675.236483367 675.236483367 675.236483367 675.236483367 675.236483367 675.236483367 1999.7857707684
11. GB-D0-11 m3 8725.4000545455 546.64918814944 546.649188149 546.649188149 546.649188149 546.649188149 546.649188149 546.649188149 546.649188149 546.649188149 546.649188149 546.649188149 546.649188149 546.649188149 1618.9606086027
A. Red Soil
1.3.1 Dusun I Kuala Tanjung
1. KT-D1-01 m3 58,814.774 3,048 3047.75 3047.75 3047.75 3047.74540873 3047.74540873 3047.74540873 3047.74540873 3047.74540873 3047.74540873 3047.74540873 3047.74540873 3047.74540873 3047.7454087272 3047.7454087272 3047.7454087272 3047.7454087 3,048 3,048 907.611
2. KT-D1-02 m3 437,218.191 22,656 22656.38 22656.38 22656.38 22656.3777016 22656.3777016 22656.3777016 22656.3777016 22656.3777016 22656.3777016 22656.3777016 22656.3777016 22656.3777016 22656.377701593 22656.377701593 22656.377701593 22656.377702 22,656 22,656 6,747.014
1.3.2 Dusun I Kuala Indah
1. KI-D1-01 m3 213,151.230 11,045 11045.37 11045.37 11045.37 11045.36563 11045.36563 11045.36563 11045.36563 11045.36563 11045.36563 11045.36563 11045.36563 11045.36563 11045.365629963 11045.365629963 11045.365629963 11045.36563 11,045 11,045 3,289.283
2. KI-D1-02 m3 372,207.455 19,288 19287.56 19287.56 19287.56 19287.5613682 19287.5613682 19287.5613682 19287.5613682 19287.5613682 19287.5613682 19287.5613682 19287.5613682 19287.5613682 19287.561368245 19287.561368245 19287.561368245 19287.561368 19,288 19,288 5,743.789
3 KI-D1-03 m3 67,968.690 3,522 3522.10 3522.10 3522.10 3522.0956917 3522.0956917 3522.0956917 3522.0956917 3522.0956917 3522.0956917 3522.0956917 3522.0956917 3522.0956917 3522.0956916994 3522.0956916994 3522.0956916994 3522.0956917 3,522 3,522 1,048.872
4. KI-D1-04 m3 85,972.593 4,455 4455.05 4455.05 4455.05 4455.0469007 4455.0469007 4455.0469007 4455.0469007 4455.0469007 4455.0469007 4455.0469007 4455.0469007 4455.0469007 4455.0469006997 4455.0469006997 4455.0469006997 4455.0469007 4,455 4,455 1,326.702
5. KI-D1-05 m3 708,014.859 36,689 36688.89 36688.89 36688.89 36688.8944719 36688.8944719 36688.8944719 36688.8944719 36688.8944719 36688.8944719 36688.8944719 36688.8944719 36688.8944719 36688.894471906 36688.894471906 36688.894471906 36688.894472 36,689 36,689 10,925.864
1.3.3 Dusun II Kuala Indah
1. KI-D2-01 m3 667,036.902 34,565 34565.44 34565.44 34565.44 34565.441967 34565.441967 34565.441967 34565.441967 34565.441967 34565.441967 34565.441967 34565.441967 34565.441967 34565.441966959 34565.441966959 34565.441966959 34565.441967 34,565 34,565 10,293.505
2. KI-D2-02 m3 562,773.404 29,163 29162.57 29162.57 29162.57 29162.5716569 29162.5716569 29162.5716569 29162.5716569 29162.5716569 29162.5716569 29162.5716569 29162.5716569 29162.5716569 29162.5716569 29162.5716569 29162.5716569 29162.571657 29,163 29,163 8,684.543
3. KI-D2-03 m3 231,740.035 12,009 12008.63 12008.63 12008.63 12008.6260552 12008.6260552 12008.6260552 12008.6260552 12008.6260552 12008.6260552 12008.6260552 12008.6260552 12008.6260552 12008.626055161 12008.626055161 12008.626055161 12008.626055 12,009 12,009 3,576.140
1.3.4 Dusun IV Kuala Indah
1. KI-D4-01 m3 1,634,851.059 84,717 84716.98 84716.98 84716.98 84716.9762687 84716.9762687 84716.9762687 84716.9762687 84716.9762687 84716.9762687 84716.9762687 84716.9762687 84716.9762687 84716.976268691 84716.976268691 84716.976268691 84716.976269 84,717 84,717 25,228.510
2. KI-D4-02 m3 65,638.301 3,401 3401.34 3401.34 3401.34 3401.33637466 3401.33637466 3401.33637466 3401.33637466 3401.33637466 3401.33637466 3401.33637466 3401.33637466 3401.33637466 3401.3363746561 3401.3363746561 3401.3363746561 3401.3363747 3,401 3,401 1,012.910
3 KI-D4-03 m3 45,040.479 2,334 2333.97 2333.97 2333.97 2333.96990069 2333.96990069 2333.96990069 2333.96990069 2333.96990069 2333.96990069 2333.96990069 2333.96990069 2333.96990069 2333.9699006886 2333.9699006886 2333.9699006886 2333.9699007 2,334 2,334 695.051
4. KI-D4-04 m3 157,958.555 8,185 8185.32 8185.32 8185.32 8185.31514534 8185.31514534 8185.31514534 8185.31514534 8185.31514534 8185.31514534 8185.31514534 8185.31514534 8185.31514534 8185.3151453366 8185.3151453366 8185.3151453366 8185.3151453 8,185 8,185 2,437.567
5. KI-D4-05 m3 381,310.357 19,759 19759.27 19759.27 19759.27 19759.2681401 19759.2681401 19759.2681401 19759.2681401 19759.2681401 19759.2681401 19759.2681401 19759.2681401 19759.2681401 19759.268140114 19759.268140114 19759.268140114 19759.26814 19,759 19,759 5,884.262
6. KI-D4-06 m3 579,379.108 30,023 30023.07 30023.07 30023.07 30023.0689995 30023.0689995 30023.0689995 30023.0689995 30023.0689995 30023.0689995 30023.0689995 30023.0689995 30023.0689995 30023.068999479 30023.068999479 30023.068999479 30023.068999 30,023 30,023 8,940.797
7. KI-D4-07 m3 969,364.169 50,232 50231.86 50231.86 50231.86 50231.8550025 50231.8550025 50231.8550025 50231.8550025 50231.8550025 50231.8550025 50231.8550025 50231.8550025 50231.8550025 50231.855002544 50231.855002544 50231.855002544 50231.855003 50,232 50,232 14,958.924
8. KI-D4-08 m3 662,275.432 34,319 34318.71 34318.71 34318.71 34318.7055138 34318.7055138 34318.7055138 34318.7055138 34318.7055138 34318.7055138 34318.7055138 34318.7055138 34318.7055138 34318.705513782 34318.705513782 34318.705513782 34318.705514 34,319 34,319 10,220.027
9. KI-D4-09 m3 379,878.974 19,685 19685.09 19685.09 19685.09 19685.0947596 19685.0947596 19685.0947596 19685.0947596 19685.0947596 19685.0947596 19685.0947596 19685.0947596 19685.0947596 19685.094759555 19685.094759555 19685.094759555 19685.09476 19,685 19,685 5,862.173
10. KI-D4-10 m3 251,872.320 13,052 13051.87 13051.87 13051.87 13051.8687079 13051.8687079 13051.8687079 13051.8687079 13051.8687079 13051.8687079 13051.8687079 13051.8687079 13051.8687079 13051.868707889 13051.868707889 13051.868707889 13051.868708 13,052 13,052 3,886.815
11. KI-D4-11 m3 79,344.475 4,112 4111.58 4111.58 4111.58 4111.58187883 4111.58187883 4111.58187883 4111.58187883 4111.58187883 4111.58187883 4111.58187883 4111.58187883 4111.58187883 4111.5818788266 4111.5818788266 4111.5818788266 4111.5818788 4,112 4,112 1,224.419
12. KI-D4-12 m3 145,187.948 7,524 7523.55 7523.55 7523.55 7523.55014386 7523.55014386 7523.55014386 7523.55014386 7523.55014386 7523.55014386 7523.55014386 7523.55014386 7523.55014386 7523.5501438609 7523.5501438609 7523.5501438609 7523.5501439 7,524 7,524 2,240.495
13. KI-D4-13 m3 252,657.358 13,093 13092.55 13092.55 13092.55 13092.5488767 13092.5488767 13092.5488767 13092.5488767 13092.5488767 13092.5488767 13092.5488767 13092.5488767 13092.5488767 13092.548876723 13092.548876723 13092.548876723 13092.548877 13,093 13,093 3,898.929
14. KI-D4-14 m3 590,402.495 30,594 30594.29 30594.29 30594.29 30594.2941442 30594.2941442 30594.2941442 30594.2941442 30594.2941442 30594.2941442 30594.2941442 30594.2941442 30594.2941442 30594.29414416 30594.29414416 30594.29414416 30594.294144 30,594 30,594 9,110.906
15. KI-D4-15 m3 679,066.288 35,189 35188.80 35188.80 35188.80 35188.7973251 35188.7973251 35188.7973251 35188.7973251 35188.7973251 35188.7973251 35188.7973251 35188.7973251 35188.7973251 35188.797325121 35188.797325121 35188.797325121 35188.797325 35,189 35,189 10,479.138
16. KI-D4-16 m3 548,945.043 28,446 28445.99 28445.99 28445.99 28445.994495 28445.994495 28445.994495 28445.994495 28445.994495 28445.994495 28445.994495 28445.994495 28445.994495 28445.994495049 28445.994495049 28445.994495049 28445.994495 28,446 28,446 8,471.148
1.3.5 Dusun VI Suka Ramai
1. SR-D6-01 m3 -
2. SR-D6-02 m3 -
3 SR-D6-03 m3 624,073.722 32,339 32339.12 32339.12 32339.12 32339.1164132 32339.1164132 32339.1164132 32339.1164132 32339.1164132 32339.1164132 32339.1164132 32339.1164132 32339.1164132 32339.116413237 32339.116413237 32339.116413237 32339.116413 32,339 32,339 9,630.510
1.3.6 Dusun VII Suka Ramai
1. SR-D7-01 m3 71,083.853 3,684 3683.52 3683.52 3683.52 3683.52151669 3683.52151669 3683.52151669 3683.52151669 3683.52151669 3683.52151669 3683.52151669 3683.52151669 3683.52151669 3683.5215166855 3683.5215166855 3683.5215166855 3683.5215167 3,684 3,684 1,096.944
2. SR-D7-02 m3 324,680.767 16,825 16824.76 16824.76 16824.76 16824.7576123 16824.7576123 16824.7576123 16824.7576123 16824.7576123 16824.7576123 16824.7576123 16824.7576123 16824.7576123 16824.757612275 16824.757612275 16824.757612275 16824.757612 16,825 16,825 5,010.372
3 SR-D7-03 m3 182,919.746 9,479 9478.79 9478.79 9478.79 9478.78873039 9478.78873039 9478.78873039 9478.78873039 9478.78873039 9478.78873039 9478.78873039 9478.78873039 9478.78873039 9478.7887303885 9478.7887303885 9478.7887303885 9478.7887304 9,479 9,479 2,822.760
4. SR-D7-04 m3 408,590.491 21,173 21172.91 21172.91 21172.91 21172.9079199 21172.9079199 21172.9079199 21172.9079199 21172.9079199 21172.9079199 21172.9079199 21172.9079199 21172.9079199 21172.907919891 21172.907919891 21172.907919891 21172.90792 21,173 21,173 6,305.241
5. SR-D7-05 m3 220,175.677 11,409 11409.37 11409.37 11409.37 11409.3681723 11409.3681723 11409.3681723 11409.3681723 11409.3681723 11409.3681723 11409.3681723 11409.3681723 11409.3681723 11409.368172316 11409.368172316 11409.368172316 11409.368172 11,409 11,409 3,397.682
6. SR-D7-06 m3 357,845.195 18,543 18543.32 18543.32 18543.32 18543.3179191 18543.3179191 18543.3179191 18543.3179191 18543.3179191 18543.3179191 18543.3179191 18543.3179191 18543.3179191 18543.31791912 18543.31791912 18543.31791912 18543.317919 18,543 18,543 5,522.155
7. SR-D7-07 m3 -
8. SR-D7-08 m3 138,932.121 7,199 7199.38 7199.38 7199.38 7199.3770723 7199.3770723 7199.3770723 7199.3770723 7199.3770723 7199.3770723 7199.3770723 7199.3770723 7199.3770723 7199.3770723008 7199.3770723008 7199.3770723008 7199.3770723 7,199 7,199 2,143.957
1.3.7 Desa Tanjung Harapan
1. TH-D0-01 m3 2,061,558.779 106,829 106828.71 106828.71 106828.71 106828.707854 106828.707854 106828.707854 106828.707854 106828.707854 106828.707854 106828.707854 106828.707854 106828.707854 106828.70785409 106828.70785409 106828.70785409 106828.70785 106,829 106,829 31,813.330
2. TH-D0-02 m3 1,429,630.232 74,083 74082.56 74082.56 74082.56 74082.5592371 74082.5592371 74082.5592371 74082.5592371 74082.5592371 74082.5592371 74082.5592371 74082.5592371 74082.5592371 74082.55923706 74082.55923706 74082.55923706 74082.559237 74,083 74,083 22,061.606
1.3.8 Desa Aras
1. AR-D0-01 m3 242,559.964 12,569 12569.31 12569.31 12569.31 12569.3081478 12569.3081478 12569.3081478 12569.3081478 12569.3081478 12569.3081478 12569.3081478 12569.3081478 12569.3081478 12569.308147764 12569.308147764 12569.308147764 12569.308148 12,569 12,569 3,743.109
2. AR-D0-02 m3 426,405.825 22,096 22096.09 22096.09 22096.09 22096.087585 22096.087585 22096.087585 22096.087585 22096.087585 22096.087585 22096.087585 22096.087585 22096.087585 22096.087584983 22096.087584983 22096.087584983 22096.087585 22,096 22,096 6,580.161
3 AR-D0-03 m3 314,767.140 16,311 16311.04 16311.04 16311.04 16311.039578 16311.039578 16311.039578 16311.039578 16311.039578 16311.039578 16311.039578 16311.039578 16311.039578 16311.039577976 16311.039577976 16311.039577976 16311.039578 16,311 16,311 4,857.388
4. AR-D0-04 m3 387,580.733 20,084 20084.20 20084.20 20084.20 20084.1952012 20084.1952012 20084.1952012 20084.1952012 20084.1952012 20084.1952012 20084.1952012 20084.1952012 20084.1952012 20084.19520123 20084.19520123 20084.19520123 20084.195201 20,084 20,084 5,981.025
1.3.9 Desa Pematang Kuing
1. PK-D0-01 m3 592183.41398767 30,687 30686.58 30686.58 30686.58 30686.5802612 30686.5802612 30686.5802612 30686.5802612 30686.5802612 30686.5802612 30686.5802612 30686.5802612 30686.5802612 30686.580261225 30686.580261225 30686.580261225 30686.580261 30,687 30,687 9,138.389
1.3.10 Desa Gambus Laut
1. GB-D0-01 m3 -
2. GB-D0-02 m3 11,793.597 611 611.14 611.14 611.14 611.136961826 611.136961826 611.136961826 611.136961826 611.136961826 611.136961826 611.136961826 611.136961826 611.136961826 611.13696182567 611.13696182567 611.13696182567 611.13696183 611 611 181.995
3 GB-D0-03 m3 -
4. GB-D0-04 m3 -
5. GB-D0-05 m3 -
6. GB-D0-06 m3 -
7. GB-D0-07 m3 -
8. GB-D0-08 m3 -
9. GB-D0-09 m3 -
10. GB-D0-10 m3 -
11. GB-D0-11 m3 -
B'. River Sand
1.3.1 Dusun I Kuala Tanjung
1. KT-D1-01 m3 296,086.726 27,950 27949.70 27949.70 27949.70 27,950 27,950 27,950 27,950 27,950 27,950 16,590
2. KT-D1-02 m3 360,045.038 33,987 33987.18 33987.18 33987.18 33,987 33,987 33,987 33,987 33,987 33,987 20,173
1.3.2 Dusun I Kuala Indah
1. KI-D1-01 m3 112,132.554 10,585 10584.98 10584.98 10584.98 10,585 10,585 10,585 10,585 10,585 10,585 6,283
2. KI-D1-02 m3 -
3 KI-D1-03 m3 49,010.918 4,626 4626.48 4626.48 4626.48 4,626 4,626 4,626 4,626 4,626 4,626 2,746
4. KI-D1-04 m3 335,081.672 31,631 31630.71 31630.71 31630.71 31,631 31,631 31,631 31,631 31,631 31,631 18,775
5. KI-D1-05 m3 -
1.3.3 Dusun II Kuala Indah
1. KI-D2-01 m3 594,054.112 56,077 56076.93 56076.93 56076.93 56,077 56,077 56,077 56,077 56,077 56,077 33,285
2. KI-D2-02 m3 -
3. KI-D2-03 m3 -
1.3.4 Dusun IV Kuala Indah
1. KI-D4-01 m3 432,762.324 40,851 40851.47 40851.47 40851.47 40,851 40,851 40,851 40,851 40,851 40,851 24,248
2. KI-D4-02 m3 -
3 KI-D4-03 m3 -
4. KI-D4-04 m3 -
5. KI-D4-05 m3 -
6. KI-D4-06 m3 -
7. KI-D4-07 m3 -
8. KI-D4-08 m3 -
9. KI-D4-09 m3 162,134.669 15,305 15305.03 15305.03 15305.03 15,305 15,305 15,305 15,305 15,305 15,305 9,084
10. KI-D4-10 m3 31,688.027 2,991 2991.26 2991.26 2991.26 2,991 2,991 2,991 2,991 2,991 2,991 1,775
11. KI-D4-11 m3 -
12. KI-D4-12 m3 -
13. KI-D4-13 m3 88,004.803 8,307 8307.39 8307.39 8307.39 8,307 8,307 8,307 8,307 8,307 8,307 4,931
14. KI-D4-14 m3 -
15. KI-D4-15 m3 216,224.247 20,411 20410.92 20410.92 20410.92 20,411 20,411 20,411 20,411 20,411 20,411 12,115
16. KI-D4-16 m3 -
1.3.5 Dusun VI Suka Ramai
1. SR-D6-01 m3 1,486,662.304 140,336 140336.48 140336.48 140336.48 140,336 140,336 140,336 140,336 140,336 140,336 83,297
2. SR-D6-02 m3 597,461.044 56,399 56398.54 56398.54 56398.54 56,399 56,399 56,399 56,399 56,399 56,399 33,476
3 SR-D6-03 m3 4,992.727 471 471.30 471.30 471.30 471 471 471 471 471 471 280
1.3.6 Dusun VII Suka Ramai
1. SR-D7-01 m3 -
2. SR-D7-02 m3 44,085.557 4,162 4161.54 4161.54 4161.54 4,162 4,162 4,162 4,162 4,162 4,162 2,470
3 SR-D7-03 m3 -
4. SR-D7-04 m3 -
5. SR-D7-05 m3 -
6. SR-D7-06 m3 33,761.821 3,187 3187.02 3187.02 3187.02 3,187 3,187 3,187 3,187 3,187 3,187 1,892
7. SR-D7-07 m3 651,270.155 61,478 61477.96 61477.96 61477.96 61,478 61,478 61,478 61,478 61,478 61,478 36,491
8. SR-D7-08 m3 53,327.191 5,034 5033.93 5033.93 5033.93 5,034 5,034 5,034 5,034 5,034 5,034 2,988
1.3.7 Desa Tanjung Harapan
1. TH-D0-01 m3 404,503.707 38,184 38183.94 38183.94 38183.94 38,184 38,184 38,184 38,184 38,184 38,184 22,664
2. TH-D0-02 m3 167,112.984 15,775 15774.97 15774.97 15774.97 15,775 15,775 15,775 15,775 15,775 15,775 9,363
1.3.8 Desa Aras
1. AR-D0-01 m3 -
2. AR-D0-02 m3 25,930.136 2,448 2447.73 2447.73 2447.73 2,448 2,448 2,448 2,448 2,448 2,448 1,453
3 AR-D0-03 m3 2,414.114 228 227.89 227.89 227.89 228 228 228 228 228 228 135
4. AR-D0-04 m3 33,636.610 3,175 3175.20 3175.20 3175.20 3,175 3,175 3,175 3,175 3,175 3,175 1,885
1.3.9 Desa Pematang Kuing
1. PK-D0-01 m3 621523.61765333 58,670 58669.97 58669.97 58669.97 58,670 58,670 58,670 58,670 58,670 58,670 34,824
1.3.10 Desa Gambus Laut
1. GB-D0-01 m3 1,108,994.593 104,686 104685.78 104685.78 104685.78 104,686 104,686 104,686 104,686 104,686 104,686 62,137
2. GB-D0-02 m3 109,548.891 10,341 10341.09 10341.09 10341.09 10,341 10,341 10,341 10,341 10,341 10,341 6,138
3 GB-D0-03 m3 728,056.423 68,726 68726.35 68726.35 68726.35 68,726 68,726 68,726 68,726 68,726 68,726 40,793
4. GB-D0-04 m3 494,204.078 46,651 46651.39 46651.39 46651.39 46,651 46,651 46,651 46,651 46,651 46,651 27,690
5. GB-D0-05 m3 103,440.152 9,764 9764.44 9764.44 9764.44 9,764 9,764 9,764 9,764 9,764 9,764 5,796
6. GB-D0-06 m3 185,008.051 17,464 17464.21 17464.21 17464.21 17,464 17,464 17,464 17,464 17,464 17,464 10,366
7. GB-D0-07 m3 229,176.658 21,634 21633.59 21633.59 21633.59 21,634 21,634 21,634 21,634 21,634 21,634 12,841
8. GB-D0-08 m3 99,890.226 9,429 9429.34 9429.34 9429.34 9,429 9,429 9,429 9,429 9,429 9,429 5,597
9. GB-D0-09 m3 21,913.270 2,069 2068.55 2068.55 2068.55 2,069 2,069 2,069 2,069 2,069 2,069 1,228
10. GB-D0-10 m3 31,289.623 2,954 2953.65 2953.65 2953.65 2,954 2,954 2,954 2,954 2,954 2,954 1,753
11. GB-D0-11 m3 18,714.335 1,767 1766.58 1766.58 1766.58 1,767 1,767 1,767 1,767 1,767 1,767 1,049
II House and Public Facilities
Dusun I Kuala Tanjung
1. Concrete m3 372.4 372.3625
2. Brick Wall m3 305.1 305.1375
3 Wood m3 679.0 678.96300072
4. River stone m3 244.2 244.17
5. Seng/alumunium m3 251.5 251.472
6. Glass m3 3.1 3.078
Dusun I Kuala Indah -
1. Concrete m3 10,952.6 10952.5605
2. Brick Wall m3 13,412.3 13412.302376
3 Wood m3 5,299.9 5299.90223232
4. River stone m3 9,223.9 9223.919
5. Seng/alumunium m3 5,640.8 5640.812
6. Glass m3 76.8 76.788
Dusun II Kuala Indah -
1. Concrete m3 8,146.5 8146.48125
2. Brick Wall m3 13,340.0 13340.039876
3 Wood m3 3,265.8 3265.78477208
4. River stone m3 8,952.9 8952.884
5. Seng/alumunium m3 5,297.6 5297.604
6. Glass m3 65.8 65.8125
Dusun IV Kuala Indah -
1. Concrete m3 9,245.3 9245.28785
2. Brick Wall m3 10,824.0 10823.9775
3 Wood m3 6,675.1 6675.11948104
4. River stone m3 7,216.7 7216.698
5. Seng/alumunium m3 5,100.7 5100.652
6. Glass m3 59.1 59.13
Dusun VI & VII Suka Ramai -
1. Concrete m3 7,298.8 7298.77995
2. Brick Wall m3 9,185.7 9185.7375
3 Wood m3 5,499.4 5499.44134272
4. River stone m3 6,541.4 6541.395
5. Seng/alumunium m3 4,378.8 4378.796
6. Glass m3 54.6 54.594
Desa Gambus Laut -
1. Concrete m3 4,572.6 4572.57025
2. Brick Wall m3 5,649.0 5649.029876
3 Wood m3 3,104.6 3104.55580976
4. River stone m3 3,972.7 3972.65
5. Seng/alumunium m3 2,679.6 2679.624
6. Glass m3 33.0 33.0075
Desa Tanjung Harapan -
1. Concrete m3 254.7 254.745
2. Brick Wall m3 408.5 408.4875
3 Wood m3 252.4 252.4417704
4. River stone m3 290.5 290.52
5. Seng/alumunium m3 209.1 209.052
6. Glass m3 1.7 1.701
Desa Aras -
1. Concrete m3 15.5 15.45
2. Brick Wall m3 9.8 9.75
3 Wood m3 179.0 178.99188216
4. River stone m3 9.8 9.75
5. Seng/alumunium m3 47.2 47.216
6. Glass m3 0.2 0.162
Desa Pematang Kuing -
1. Concrete m3 149.4 149.425
2. Brick Wall m3 228.9 228.9375
3 Wood m3 175.4 175.44524016
4. River stone m3 175.2 175.155
5. Seng/alumunium m3 117.9 117.932
6. Glass m3 1.5 1.458
III Closure and Relocation of Tributaries
3.1 Closure of Tributaries
3.1.1 Cutting and Disposal
3.1.2 Cut, Filling and Compaction (from Quary)
A. Red Soil
1 Sungai Tanjung
1 AR-D0-01 m3 54,528.514 2,825.634 2,825.634 2,825.634 2,825.634 2,825.634 2,825.634 2,825.634 2,825.634 2,825.634 2,825.634 2,825.634 2,825.634 2,825.634 2,825.634 2,825.634 146.423 146.423 146.423 146.423 11,558.313
2 AR-D0-02 m3 27,070.522 1,402.778 1,402.778 1,402.778 1,402.778 1,402.778 1,402.778 1,402.778 1,402.778 1,402.778 1,402.778 1,402.778 1,402.778 1,402.778 1,402.778 1,402.778 72.691 72.691 72.691 72.691 5,738.091
3 SR-D6-03 m3 15,589.702 807.849 807.849 807.849 807.849 807.849 807.849 807.849 807.849 807.849 807.849 807.849 807.849 807.849 807.849 807.849 41.862 41.862 41.862 41.862 3,304.521
2 Sungai Dua -
1 AR-D0-04 m3 24,878.007 1,289.163 1,289.163 1,289.163 1,289.163 1,289.163 1,289.163 1,289.163 1,289.163 1,289.163 1,289.163 1,289.163 1,289.163 1,289.163 1,289.163 1,289.163 66.804 66.804 66.804 66.804 5,273.347
2 SR-D6-03 m3 15,563.030 806.467 806.467 806.467 806.467 806.467 806.467 806.467 806.467 806.467 806.467 806.467 806.467 806.467 806.467 806.467 41.791 41.791 41.791 41.791 3,298.868
3 AR-D0-03 m3 18,407.366 953.858 953.858 953.858 953.858 953.858 953.858 953.858 953.858 953.858 953.858 953.858 953.858 953.858 953.858 953.858 49.428 49.428 49.428 49.428 3,901.777
3 Drainase Belanda -
1 PK-D0-01 m3 33,821.349 1,752.602 1,752.602 1,752.602 1,752.602 1,752.602 1,752.602 1,752.602 1,752.602 1,752.602 1,752.602 1,752.602 1,752.602 1,752.602 1,752.602 1,752.602 90.819 90.819 90.819 90.819 7,169.052
4 Parit 3 -
1 KI-D4-06 m3 22,075.133 1,143.920 1,143.920 1,143.920 1,143.920 1,143.920 1,143.920 1,143.920 1,143.920 1,143.920 1,143.920 1,143.920 1,143.920 1,143.920 1,143.920 1,143.920 59.277 59.277 59.277 59.277 4,679.227
2 KI-D2-01 m3 15,840.793 820.860 820.860 820.860 820.860 820.860 820.860 820.860 820.860 820.860 820.860 820.860 820.860 820.860 820.860 820.860 42.536 42.536 42.536 42.536 3,357.745
3 KT-D1-01 m3 -
4 KI-D1-02 m3 17,726.976 918.601 918.601 918.601 918.601 918.601 918.601 918.601 918.601 918.601 918.601 918.601 918.601 918.601 918.601 918.601 47.601 47.601 47.601 47.601 3,757.556
5 KI-D1-04 m3 2,070.941 107.315 107.315 107.315 107.315 107.315 107.315 107.315 107.315 107.315 107.315 107.315 107.315 107.315 107.315 107.315 5.561 5.561 5.561 5.561 438.974
6 KI-D1-05 m3 4,724.921 244.842 244.842 244.842 244.842 244.842 244.842 244.842 244.842 244.842 244.842 244.842 244.842 244.842 244.842 244.842 12.688 12.688 12.688 12.688 1,001.533
5 Anak Sungai Gambus
1 GB-D0-08 m3 -
6 Titik Payung
1 GB-D0-04 m3 -
7 Sungai Pandan
1 SR-D7-02 m3 20,543.044 1,064.528 1,064.528 1,064.528 1,064.528 1,064.528 1,064.528 1,064.528 1,064.528 1,064.528 1,064.528 1,064.528 1,064.528 1,064.528 1,064.528 1,064.528 55.163 55.163 55.163 55.163 4,354.473
2 SR-D7-06 m3 3,940.952 204.218 204.218 204.218 204.218 204.218 204.218 204.218 204.218 204.218 204.218 204.218 204.218 204.218 204.218 204.218 10.582 10.582 10.582 10.582 835.357
8 Sungai Tampus
1 SR-D7-02 m3 39,349.562 2,039.070 2,039.070 2,039.070 2,039.070 2,039.070 2,039.070 2,039.070 2,039.070 2,039.070 2,039.070 2,039.070 2,039.070 2,039.070 2,039.070 2,039.070 105.663 105.663 105.663 105.663 8,340.857
2 KI-D4-15 m3 32,348.036 1,676.255 1,676.255 1,676.255 1,676.255 1,676.255 1,676.255 1,676.255 1,676.255 1,676.255 1,676.255 1,676.255 1,676.255 1,676.255 1,676.255 1,676.255 86.863 86.863 86.863 86.863 6,856.756
3 SR-D7-01 m3 11,205.086 580.641 580.641 580.641 580.641 580.641 580.641 580.641 580.641 580.641 580.641 580.641 580.641 580.641 580.641 580.641 30.088 30.088 30.088 30.088 2,375.122
9 Anak Sungai Dalu Dalu
1 KI-D4-07 m3 191,755.983 9,936.677 9,936.677 9,936.677 9,936.677 9,936.677 9,936.677 9,936.677 9,936.677 9,936.677 9,936.677 9,936.677 9,936.677 9,936.677 9,936.677 9,936.677 514.912 514.912 514.912 514.912 40,646.177
B. River Sand
1 Sungai Tanjung
1 AR-D0-01 m3 -
2 AR-D0-02 m3 4,572.570 153.714 153.714 153.714 153.714 153.714 153.714 153.714 153.714 153.714 153.714 91.238
3 SR-D6-03 m3 5,649.030 - - - - - - - - - - -
2 Sungai Dua 3,104.556 - - - - - - - - - - -
1 AR-D0-04 m3 3,972.650 123.676 123.676 123.676 123.676 123.676 123.676 123.676 123.676 123.676 123.676 73.408
2 SR-D6-03 m3 2,679.624 - - - - - - - - - - -
3 AR-D0-03 m3 33.008 - - - - - - - - - - -
3 Drainase Belanda - - - - - - - - - - - -
1 PK-D0-01 m3 254.745 871.750 871.750 871.750 871.750 871.750 871.750 871.750 871.750 871.750 871.750 517.432
4 Parit 3 408.488 - - - - - - - - - - -
1 KI-D4-06 m3 252.442 - - - - - - - - - - -
2 KI-D2-01 m3 290.520 862.276 862.276 862.276 862.276 862.276 862.276 862.276 862.276 862.276 862.276 511.809
3 KT-D1-01 m3 209.052 363.460 363.460 363.460 363.460 363.460 363.460 363.460 363.460 363.460 363.460 215.734
4 KI-D1-02 m3 1.701 - - - - - - - - - - -
5 KI-D1-04 m3 - 551.613 551.613 551.613 551.613 551.613 551.613 551.613 551.613 551.613 551.613 327.413
6 KI-D1-05 m3 15.450 - - - - - - - - - - -
5 Anak Sungai Gambus 9.750 - - - - - - - - - - -
1 GB-D0-08 m3 178.992 849.237 849.237 849.237 849.237 849.237 849.237 849.237 849.237 849.237 849.237 504.069
6 Titik Payung 9.750 - - - - - - - - - - -
1 GB-D0-04 m3 47.216 1,869.512 1,869.512 1,869.512 1,869.512 1,869.512 1,869.512 1,869.512 1,869.512 1,869.512 1,869.512 1,109.659
7 Sungai Pandan 0.162 - - - - - - - - - - -
1 SR-D7-02 m3 - 262.304 262.304 262.304 262.304 262.304 262.304 262.304 262.304 262.304 262.304 155.692
2 SR-D7-06 m3 149.425 212.991 212.991 212.991 212.991 212.991 212.991 212.991 212.991 212.991 212.991 126.422
8 Sungai Tampus 228.938 - - - - - - - - - - -
1 SR-D7-02 m3 175.445 388.285 388.285 388.285 388.285 388.285 388.285 388.285 388.285 388.285 388.285 230.469
2 KI-D4-15 m3 175.155
3 SR-D7-01 m3 117.932
9 Anak Sungai Dalu Dalu 1.458
1 KI-D4-07 m3 -
3.2 Relocation Tributaries
3.2.1 Cutting and Disposal
- Sungai Tanjung m3
- Sungai Dua m3
- Drainase Belanda m3
- Parit 3 m3
- Anak Sungai Gambus m3
- Sungai Titik Payung m3
- Sungai Pandan m3
- Sungai Tampus m3
- Anak Sungai Dalu-dalu m3
3.2.2 Cut, Filling and Compaction (from Quary)
- Sungai Tanjung m3
- Sungai Dua m3
- Drainase Belanda m3
- Parit 3 m3
- Anak Sungai Gambus m3
- Sungai Titik Payung m3
- Sungai Pandan m3
- Sungai Tampus m3
- Anak Sungai Dalu-dalu m3
3.2.3 Cofferdam and Dewatering
- Sungai Tanjung Ls
- Sungai Dua Ls
- Drainase Belanda Ls
- Parit 3 Ls
- Anak Sungai Gambus Ls
- Sungai Titik Payung Ls
- Sungai Pandan Ls
- Sungai Tampus Ls
- Anak Sungai Dalu-dalu Ls
IV Relocation Water Intake PT Inalum
1 Installation of New Line (Pipe) m'
2 Construction of New Water Intake Ls
3 Demolishing of Pipe and Wtaer Inatkae Facilities Ls
V Relocation SUTT/Distribution of PLN
1 Relocation of SUTT Ls
2 Demolish eksisting distribution Ls
VI Demolish and Relocation of Road and Drainage
1 Demolished of Existing Road
- Regency Road m' 3,089.8
- Province Road m' 4,920.1
2 Relocation of Road (New Construction) and Bridge
- Alternative Road m' 9,405.4 3,135.1 3,135.1 3,135.1
- New Bridge L = 120 m (Sungai Dalu-dalu) Unit
- New Bridge L = 30 m (Sungai Gambus 1) Unit
- New Bridge L = 20 m (Sungai Gambus 2) Unit
VII Demolish and Relocation of Cemetery
Dusun I Kuala Indah -1 m2 756.6
Dusun I Kuala Indah -2 m2 2,690.9
Dusun IV Kuala Indah m2 2,593.8
Desa Suka Ramai m2 1,060.1
Desa Tanjung Harapan m2 933.5
Desa Gambus Laut m2 1,471.8
VIII Temporary Road
1 New Construction m'
2 Improvement existing Road (Benteng/tanggul) m'
IX Temporary Drainage
1 Normalisation of Eksisting Drainage/Tributeries m'
2 Construction Drainage System (Polder, retarding basLs
X Facilities Support
1 Constrcution of Fence m' 42,385.0 14,128.3 14,128.3 14,128.3
2 Constrcution of Guard Post Unit 28.0 10.0 10 8
XI Slope Stabilisation / Lereng
1 Retaining Wall m3
2 Stone Masonry m3
3 Embankment m3
Rancangan Anggaran Biaya
Pekerjaan : Pembongkaran jaringan transmisi
Lokasi : Kuala Tanjung, Batu Bara
Tahun : 2020
Harga
No Deskripsi Qty Satuan
Item
A Pembangunan SUTT
1 AA+0 - 150KV Two Circuit Suspension Tower 5 Set IDR 137,027,535
2 BB+0 - 150KV Two Circuit Tension Tower 1 Set IDR 183,247,763
3 CC+0 - 150KV Two Circuit Tension Tower 2 Set IDR 235,348,976
4 DD+0 - 150KV Two Circuit Tension Tower 2 Set IDR 291,183,026
5 Six Single line conductor ACSR/AS 250 4000 Meter IDR 43,920
6 Set of single OPGW 70 mm2 condutors complete with joint boxes 4000 Meter IDR 53,557
7 One earth conductor, AS 70 4000 Meter IDR 19,529
8 Aromour Rod for earthwire AS 70 5 Set IDR 128,178
9 Suspension set single string (U 120 BP) 30 Set IDR 5,977,007
10 Tension set double string (U 120 BP) 30 Set IDR 12,372,046
11 Ground wire suspension set for AS 70 5 Set IDR 646,048
12 Ground wire suspension set for OPGW 70 5 Set IDR 969,073
13 Ground wire tension set for AS 70 10 Set IDR 969,073
14 Ground wire tension set for OPGW 70 10 Set IDR 2,260,115
15 Ground wire suspension clamp AS 70 5 Set IDR 646,048
16 Ground wire suspension clamp OPGW 70 5 Set IDR 969,073
17 Ground wire tension clamp AS 70 10 Set IDR 969,073
18 Ground wire tension clamp OPGW 70 10 Set IDR 2,260,115
19 Biaya Mobilisasi-Demobilisasi (Taksir) 10 Set IDR 20,000,000
19 Total A 135
B Pembongkaran SUTT
1 AA+0 - 150KV Two Circuit Suspension Tower 7 Set IDR -
2 BB+0 - 150KV Two Circuit Tension Tower 2 Set IDR -
4 DD+0 - 150KV Two Circuit Tension Tower 1 Set IDR -
5 Six Single line conductor ACSR/AS 250 3950 Meter IDR -
6 Set of single OPGW 70 mm2 condutors complete with joint boxes 3950 Meter IDR -
7 One earth conductor, AS 70 3950 Meter IDR -
8 Aromour Rod for earthwire AS 70 7 Set IDR -
9 Suspension set single string (U 120 BP) 42 Set IDR -
10 Tension set double string (U 120 BP) 18 Set IDR -
11 Ground wire suspension set for AS 70 7 Set IDR -
12 Ground wire suspension set for OPGW 70 7 Set IDR -
13 Ground wire tension set for AS 70 6 Set IDR -
14 Ground wire tension set for OPGW 70 6 Set IDR -
15 Ground wire suspension clamp AS 70 7 Set IDR -
16 Ground wire suspension clamp OPGW 70 7 Set IDR -
17 Ground wire tension clamp AS 70 6 Set IDR -
18 Ground wire tension clamp OPGW 70 6 Set IDR -
19 Total B 129
C Perubahan SUTT
1 CC+0 - 150KV Two Circuit Tension Tower 1 Set IDR 235,348,976
2 Tension set double string (U 120 BP) 6 Set IDR 12,372,046
3 Ground wire tension set for AS 70 2 Set IDR 969,073
4 Ground wire tension set for OPGW 70 2 Set IDR 2,260,115
5 Ground wire tension clamp AS 70 2 Set IDR 969,073
6 Ground wire tension clamp OPGW 70 2 Set IDR 2,260,115
7 Total C 15
1 Total (A+B+C) 279
Harga
Total
Upah Kerja
(7)
IDR 246,880
IDR 5,530,816
IDR 123,333
IDR 359,346
IDR 115,800
IDR 57,900
IDR 77,702
IDR 28,950
IDR 409,171
IDR 2,109,800
IDR 452,200
IDR 9,511,898
IDR 8,296,224
IDR 493,332
IDR 1,289,418
IDR 173,700
IDR 94,276
IDR 189,412
IDR 466,212
IDR 28,950
IDR 233,752
IDR 3,767,500
IDR 807,500
IDR 15,840,276
IDR 246,880
IDR 10,543,118
IDR 246,666
IDR 1,733,316
IDR 115,800
IDR 141,414
IDR 473,530
IDR 349,659
IDR 28,950
IDR 409,066
IDR 309,946
IDR 4,068,900
IDR 872,100
IDR 19,539,345
IDR 5,876,492
IDR 246,666
IDR 1,035,762
IDR 289,500
IDR 94,706
IDR 77,702
IDR 58,438
IDR 2,411,200
IDR 516,800
IDR 10,607,266
IDR 493,760
IDR 4,148,112
IDR 739,998
IDR 655,278
IDR 347,400
IDR 310,808
IDR 28,950
IDR 818,342
IDR 2,411,200
IDR 516,800
IDR 10,470,648
IDR 493,760
IDR 4,148,112
IDR 760,968
IDR 173,700
IDR 155,404
IDR 116,876
IDR 618,170
IDR 1,959,100
IDR 419,900
IDR 8,845,990
IDR 1,209,866
IDR 211,380
IDR 57,900
IDR 77,702
IDR 602,800
IDR 129,200
IDR 4,200,000
IDR 6,488,848
IDR -
IDR -
IDR -
IDR -
IDR -
IDR -
IDR 81,304,271
DAFTAR HARGA SATUAN DASAR UPAH TENAGA KERJA,
Harga
No Uraian Satuan Kode Satuan Dasar Ket.
( Rp. )
1 2 3 4 5 6
I UPAH TENAGA KERJA
1 Pekerja OH L.01 110,000.00
2 Tukang OH L.02 132,000.00
3 Kepala Tukang OH L.03 143,000.00
4 Mandor OH L.04 132,000.00
5 Juru ukur, operator/mekanik alat berat OH L.05 126,500.00
6 Pembantu Juru ukur & operator/mekanik alat berat OH L.06 88,000.00
7 Akhli Muda OH L.07 408,000.00
8 Akhli Madya OH L.08 500,000.00
9 Akhli Utama OH L.09 700,000.00
10 Supir Truck OH L.10 88,000.00
11 Supir Kendaraan < 2 ton (termasuk sedan) OH L.11 88,000.00
12 Kenek OH L.12 88,000.00
13 Penjaga malam/Satpam OH L.13 110,000.00
14 Drafter CAD/manual OH L.14 120,000.00
15 Desain Engineer OH L.15 500,000.00
16 Operator komputer/printer/ploter OH L.16 120,000.00
II BAHAN / MATERIAL
A KELOMPOK AIR, TANAH, BATU DAN SEMEN
1 Abu Batu m3 M.01 150,000.00
2 Air m 3
M.02 25,000.00
3 Bahan Aditif (Caldbon, Strorox, dll) L M.03 35,000.00
4 Batu bata / merah bakar kelas I bh M.04.a 1,000.00
5 Batu bata / merah bakar kelas II bh M.04.b 700.00
6 Batu bata / merah bakar kw biasa bh M.04.c 600.00
7 Batu bata / merah bakar pres bh M.04.d 650.00
8 Batu bata / merah oven (Klingker) bh M.04.e 13,750.00
9 Batu / batu kali/ batu belah m3 M.05 333,500.00
10 Batu brojol (Untuk bronjong) m3 M.06 118,250.00
11 Batu candi m 2
M.07a 140,500.00
12 Batu muka m2 M.07b 100,000.00
13 Bentonit kg M.08 8,500.00
14 Beton Ready Mixed K-175 m3 M.09.a 710,000.00
15 Beton Ready Mixed K-200 m3 M.09.b 1,500,800.00
16 Beton Ready Mixed K-225 m3 M.09.c 740,000.00
17 Beton Ready Mixed K-250 m 3
M.09.d 1,552,800.00
18 Beton Ready Mixed K-275 m3 M.09.e 1,564,800.00
19 Beton Ready Mixed K-300 m3 M.09.f 810,000.00
20 Beton Ready Mixed K-325 m3 M.09.g 1,646,400.00
21 Beton Ready Mixed K-350 m3 M.09.h 1,684,000.00
22 Beton Ready Mixed K-375 m3 M.09.i 1,721,600.00
23 Beton Ready Mixed K-400 m3 M.09.j 1,736,800.00
24 Beton Ready Mixed K-425 m3 M.09.k 1,757,120.00
Harga
No Uraian Satuan Kode Satuan Dasar Ket.
( Rp. )
1 2 3 4 5 6
B KELOMPOK KAYU
C KELOMPOK LOGAM
D KELOMPOK PIPA
IV LAIN-LAIN
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
1 2 3 4 5 6
1 Galian tanah di Lokasi Pekerjaan (Stripping Top Soil) (m3) TM.04.a.b m3 1.00 Rp21,390
2 Pengangkatan Tanah Top Soil ke DT (m3) TM.04.a.a m3 1.00 Rp14,580
2 DT angkut material dari lokasi pekerjaan ke TPA/Borrow Area (QuarTM.04.b.c m3 1.00 Rp74,290
3 Tanah dihampar, diratakan dan dirapihkan TM.02.c m3 1.00 Rp8,625
Jumlah Harga Satuan Pekerjaan
Note : Untuk pekerjaan galian existing road diambil koefisien 0,8 0.8
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
1 2 3 4 5 6
A Tenaga Kerja
1 Pekerja L.01 jam
2 Mandor L.04 jam
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
1 Biaya Operasi Exavator (Standard) jam 0.0223 Rp568,087
2 Biaya Operasi Bulldozer jam 0.0095 Rp619,931
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E Overhead + Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan per - m 3 (D+E)
TM.04.b.c DT angkut material dari lokasi pekerjaan ke TPA/Borrow Area (Quarry), jarak 30 km (m3)
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
1 2 3 4 5 6
A Tenaga Kerja
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
2 Biaya Operasi Dump truck jam 0.1606 Rp402,156
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E Overhead + Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan per - m 3 (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
1 2 3 4 5 6
A Tenaga Kerja
1 Pekerja L.01 jam
2 Mandor L.04 jam
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
1 Biaya Operasi Exavator (Standard) jam 0.0223 Rp568,087
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E Overhead + Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan per - m 3 (D+E)
PERHITUNGAN CARA MEKANIS
( informatif )
Jumlah (Rp)
7
Rp21,390
Rp14,580
Rp74,290
Rp8,625
Rp118,885
Rp95,108
Jumlah (Rp)
Rp0
Rp0
Rp0
Rp0
Rp12,681
Rp5,917
Rp18,598
Rp18,598
Rp2,790
Rp21,390
Jumlah (Rp)
Rp0
Rp0
Rp64,600
Rp64,600
Rp64,600
Rp9,690
Rp74,290
Jumlah (Rp)
Rp0
Rp0
Rp0
Rp0
Rp12,681
Rp12,681
Rp12,681
Rp1,902
Rp14,580
PERHITUNGAN CARA MEKANIS
( informatif )
2) AHSP GALI, ANGKUT MATERIAL/HASIL GALIAN
TM.04.2 JENIS PEKERJAAN : MENGGALI TANAH STRIPPING DAN MENGANGKUT KE LOKASI PEKERJAAN DENGAN DUMPTRUCK
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
1 2 3 4 5 6
1 Galian tanah di Lokasi Pekerjaan (Stripping Top Soil) (m3) TM.04.a.b m3 1.00 Rp21,390
2 Pengangkatan Tanah Top Soil ke DT (m3) TM.04.a.a m3 1.00 Rp14,580
2 DT angkut material dari lokasi pekerjaan ke TPA/Borrow Area (QuarTM.04.b.c m3 1.00 Rp74,290
3 Tanah dihampar, diratakan dan dirapihkan TM.02.c m3 1.00 Rp8,625
Jumlah Harga Satuan Pekerjaan
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
1 2 3 4 5 6
A Tenaga Kerja
1 Pekerja L.01 jam
2 Mandor L.04 jam
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
1 Biaya Operasi Exavator (Standard) jam 0.0223 Rp568,087
2 Biaya Operasi Bulldozer jam 0.0095 Rp619,931
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E Overhead + Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan per - m 3 (D+E)
TM.04.b.c DT angkut material dari lokasi pekerjaan ke TPA/Borrow Area (Quarry), jarak 30 km (m3)
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
1 2 3 4 5 6
A Tenaga Kerja
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
2 Biaya Operasi Dump truck jam 0.1606 Rp402,156
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E Overhead + Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan per - m 3 (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
1 2 3 4 5 6
A Tenaga Kerja
1 Pekerja L.01 jam
2 Mandor L.04 jam
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
1 Biaya Operasi Exavator (Standard) jam 0.0223 Rp568,087
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E Overhead + Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan per - m 3 (D+E)
PERHITUNGAN CARA MEKANIS
( informatif )
Jumlah (Rp)
7
Rp21,390
Rp14,580
Rp74,290
Rp8,625
Rp118,885
Jumlah (Rp)
Rp0
Rp0
Rp0
Rp0
Rp12,681
Rp5,917
Rp18,598
Rp18,598
Rp2,790
Rp21,390
Jumlah (Rp)
Rp0
Rp0
Rp64,600
Rp64,600
Rp64,600
Rp9,690
Rp74,290
Jumlah (Rp)
Rp0
Rp0
Rp0
Rp0
Rp12,681
Rp12,681
Rp12,681
Rp1,902
Rp14,580
PERHITUNGAN CARA MEKANIS
( informatif )
AHSP GALI, ANGKUT MATERIAL/HASIL GALIAN DAN PEMADATAN
TM.04.2 JENIS PEKERJAAN : MENGGALI TANAH,MENGANGKUT KE LOKASI PEKERJAAN DENGAN DUMPTRUCK DAN PEMADATAN
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
1 2 3 4 5 6
1 Galian tanah di Borrow Area (tidak termasuk beli tanah) TM.04.a.b m3 1.00 Rp14,580
2 DT angkut material dari BA ke lokasi pekerjaan, jarak 30 km TM.04.b.c m3 1.00 Rp74,290
3 Pemadatan tanah di lokasi pekerjaan (m3) TM.04.c m3 1.00 Rp65,230
Jumlah Harga Satuan Pekerjaan
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
1 2 3 4 5 6
A Tenaga Kerja
1 Pekerja L.01 jam
2 Mandor L.04 jam
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
1 Biaya Operasi Exavator (Standard) jam 0.0223 Rp568,087
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E Overhead + Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan per - m 3 (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
1 2 3 4 5 6
A Tenaga Kerja
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
1 Biaya Operasi Dump truck jam 0.1606 Rp402,156
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E Overhead + Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan per - m 3 (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
1 2 3 4 5 6
A Tenaga Kerja
1 Pekerja L.01 jam
2 Mandor L.04 jam
Jumlah Harga Tenaga Kerja
B Bahan
1 Tanah Galian Di BA m3 1.100 Rp34,000
Jumlah Harga Bahan
C Peralatan
1 Biaya Operasi Buldozer jam 0.0191 Rp619,931
2 Biaya Operasi Water Tank Truck jam 0.0078 Rp263,408
3 Biaya Operasi Roller Vibro jam 0.0178 Rp305,826
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E Overhead + Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan per - m 3 (D+E)
PERHITUNGAN CARA MEKANIS
( informatif )
Jumlah (Rp)
7
Rp14,580
Rp74,290
Rp65,230
Rp154,100
Jumlah (Rp)
Rp0
Rp0
Rp0
Rp0
Rp12,681
Rp12,681
Rp12,681
Rp1,902
Rp14,580
Jumlah (Rp)
Rp0
Rp0
Rp64,600
Rp64,600
Rp64,600
Rp9,690
Rp74,290
Jumlah (Rp)
Rp0
Rp0
Rp0
Rp37,400
Rp37,400
Rp11,834
Rp2,049
Rp5,437
Rp19,320
Rp56,720
Rp8,508
Rp65,230
ANALISIS PRODUKTIVITAS ALAT BERAT UNTUK PEMBONGKARAN BANGUNAN,
NO U R A I A N
I. ASUMSI
1. Jam kerja efektif per hari
2. Tahapan kerja.
a. Bangunan dihancurkan secara bertahap dengan menggunakan
. alat berat Excavator
II. ALAT
a. Excavator Standard
Kapasitas Bucket
Faktor Bucket
Faktor Efisiensi Alat
Waktu Siklus
Membongkar/swing
Swing kembali dan lain - lain
No Uraian
1 2
A Tenaga Kerja
1 Pekerja
2 Mandor
B Bahan
C Peralatan
1 Biaya Operasi Excavator
No Uraian
1 2
A Tenaga Kerja
1 Pekerja
2 Mandor
B Bahan
C Peralatan
1 Biaya Operasi Excavator
3 Biaya Operasi Bulldozer
4 Biaya Operasi Dump Truck
I.
Tk 7.00 jam 1.
3.
4.
II.
V 1.00 m3 a.
Fb 0.80 Pemuatan sedang
Fa 0.71 Baik
Ts1 Menit
T. 1 0.40 Menit
T. 2 0.30 Menit
Ts.1 0.70 Menit
0.0205 jam
b.
c.
3 4 5 6 7
L.01 jam
L.04 jam
Jumlah Harga Tenaga Kerja
3 4 5 6 7
L.01 jam
L.04 jam
Jumlah Harga Tenaga Kerja
U R A I A N KODE KOEF
ASUMSI
Jam kerja efektif per hari Tk 7.00
Jarak angkut L 30.00
Tahapan kerja.
a. Bulldozer menyusun material hasil bongkaran
b. Excavator mengangkat material ke atas Dump Truck
c. Dump truck mengangkut material-material ke lokasi Pembuangan
ALAT
Excavator Standard
Kapasitas Bucket V 1.00
Faktor Bucket Fb 0.80
Faktor Efisiensi Alat Fa 0.71
Dump Truck
Kapasitas Bak V 24.00
Faktor Efisiensi Alat Fa 0.75
Kecepatan rata-rata bermuatan v.1 30.00
Kecepatan rata-rata kosong v.2 35.00
No. URAIAN
SATUAN KETERANGAN
URAIAN PERALATAN
A. 1.
Jenis Peralatan
jam 2. Merk / Tipe
km 3. Tenaga
4. Kapasitas
5. Umur Ekonomis
6. Jam Operasi Dalam 1 Tahun
7. Harga Alat
m3
Menit
m3
m3
jam
IAYA OPERASI ALAT BERAT UNTUK GALIAN TANAH, ANGKUTAN DUMP TRUCK
or, Dump Truck, Buldozer, Roller Vibro dan Water Tanker
Excavator
Dump Truck Bulldozer Roller Vibro
(Standard)
- 80-140 HP 20-24 M3 100-150 HP 5-8 Ton
Pw HP 133.0 100.0 150.0 82.0
Cp - 0.9 24.0 - 7.1
A Tahun 5.0 5.0 5.0 5.0
W Jam 2,000 2,000 2,000 2,000
M KERJA
H Rp/jam 138,852.00 104,400.00 156,600.00 85,608.00
si Peralatan KETERANGAN
250,000,000 1,400,000,000
25,000,000 140,000,000
Suku bunga
0.26380 0.26380 i = 10%
29,677.22 166,192.41
Asuransi
250.00 1,400.00 p = 0.2%
29,927.22 167,592.41
233,480.36 395,112.86
263,407.57 562,705.27
7,200.00 7,200.00
8,700.00 8,700.00
30,000.00 30,000.00
PERHITUNGAN CARA MEKANIS
( informatif )
4) AHSP GALI, ANGKUT MATERIAL/HASIL GALIAN DAN PEMADATAN
TM.04.2 Galian Pasir Muara
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
1 2 3 4 5 6
1 Galian Pasir Muara TM.04.a.b m3 1.00 Rp12,230
2 Ponton mengangkut material ke Area Pekerjaan TM.04.a.b m3 1.00 Rp137,840
3 Excavator mengangkut pasir dari ponton ke DT TM.04.b.c m3 1.00 Rp12,230
4 DT angkut material dari lokasi ponton ke lokasi pekerjaan. jarak 2 km (m3) TM.04.b.c m3 1.00 Rp3,540
Jumlah Harga Satuan Pekerjaan
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
1 2 3 4 5 6
A Tenaga Kerja
1 Pekerja L.01 jam
2 Mandor L.04 jam
Jumlah Harga Tenaga Kerja
B Bahan
1 Pasir Muara m3 1.200 Rp0
Jumlah Harga Bahan
C Peralatan
1 Biaya Operasi Exavator (Standard) + Ponton jam 0.0171 Rp621,452
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E Overhead + Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan per - m 3 (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
1 2 3 4 5 6
A Tenaga Kerja
1 Pekerja L.01 jam
2 Mandor L.04 jam
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
1 Ponton jam 0.5134 Rp233,480
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E Overhead + Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan per - m 3 (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
1 2 3 4 5 6
A Tenaga Kerja
1 Pekerja L.01 jam
2 Mandor L.04 jam
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
1 Biaya Operasi Exavator (Standard) + Ponton jam 0.0171 Rp621,452
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E Overhead + Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan per - m 3 (D+E)
TM.04.b.c DT angkut material dari lokasi ponton ke lokasi pekerjaan. jarak 2 km (m3)
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
1 2 3 4 5 6
A Tenaga Kerja
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
2 Biaya Operasi Dump truck jam 0.0077 Rp402,156
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E Overhead + Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan per - m 3 (D+E)
RHITUNGAN CARA MEKANIS
( informatif )
Jumlah (Rp)
7
Rp12,230
Rp137,840
Rp12,230
Rp3,540
Rp165,840
Jumlah (Rp)
Rp0
Rp0
Rp0
Rp0
Rp0
Rp10,634
Rp10,634
Rp10,634
Rp1,595
Rp12,230
Jumlah (Rp)
Rp0
Rp0
Rp0
Rp0
Rp119,861
Rp119,861
Rp119,861
Rp17,979
Rp137,840
Jumlah (Rp)
Rp0
Rp0
Rp0
Rp0
Rp10,634
Rp10,634
Rp10,634
Rp1,595
Rp12,230
arak 2 km (m3)
Jumlah (Rp)
7
Rp0
Rp0
Rp3,078
Rp3,078
Rp3,078
Rp462
Rp3,540
AHSP PEKERJAAN UNTUK 1 M2 PAGAR PENGAMAN
1 2 3 4 5
A Tenaga Kerja
1 Pekerja L.01 OH 0.375
2 Tukang L.02 OH 0.125
3 Kepala Tukang L.03 OH 0.0120
4 Mandor L.04 OH 0.0190
Jumlah Harga Tenaga
B Bahan
Panel Beton Pracetak Lbr 0.986
Kolom Beton Pracetak Btg 0.525
Semen Portland Kg 45
Pasir m3 0.074
Koral Beton 1-2 cm m3 0.146
Jumlah Harga B
C Peralatan
Jumlah Harga Pera
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E Overhead + Profit (Contoh 15%) 15%
F Harga Satuan Pekerjaan per - m (D+E) 3
Rp44,990,065,175
Rp1,061,462
AHSP PEKERJAAN UNTUK 1 M2 POS PENJAGA
6 7 1
A
Rp110,000 Rp41,250 1
Rp132,000 Rp16,500 2
Rp143,000 Rp1,716 3
Rp132,000 Rp2,508 4
Jumlah Harga Tenaga Kerja Rp61,974
B
Rp123,000 Rp121,278
Rp260,000 Rp136,500
Rp2,006 Rp90,270
Rp215,300 Rp15,932
Rp243,500 Rp35,551
Jumlah Harga Bahan Rp399,531 C
800000
AHSP PEKERJAAN UNTUK 1 M2 POS PENJAGA
Harga Satuan
Uraian Kode Satuan Koefisien Jumlah (Rp)
(Rp)
2 3 4 5 6 7
Tenaga Kerja
Pekerja L.01 OH 1 110000 110000
Tukang Kayu L.02 OH 1.5 132000 198000
Kepala Tukang L.03 OH 0.1500 143,000.00 21450
Mandor L.04 OH 0.0500 132,000.00 6600
Jumlah Harga Tenaga Kerja 336050
Bahan
Dolken Kayu ø 8-10/400 cm Btg 3 138,000.00 414,000.00
Kayu m 3
0.276 1,100,000.00 303,600.00
Paku Biasa Kg 0.7 21,600.00 15,120.00
Seng Gelombang Kg 1.5 36,000.00 54,000.00
Jumlah Harga Bahan 786720
Peralatan
Jumlah Harga Peralatan Rp1,122,770.00
Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) Rp1,122,770.00
Overhead + Profit (Contoh 15%) 15% x D Rp168,415.50
Harga Satuan Pekerjaan per - m (D+E) 3 Rp1,291,185.50
Pos jaga 3 x 3 m
Panjang = 3m
Lebar = 3m
Unit = 28 Unit
Volume = 252 m2
###
No Nama Dusun Luas (m2) Volume Galian (m3) Volume Timbunan (m3)
No Nama Dusun Luas (m2) Tanah Merah (m3) Pasir Muara (m3)
No Nama Muara Luas (m2) Tanah Merah (m3) Pasir Muara (m3)
1 Muara Tanjung
1 AR-D0-01 14,017.336 54,528.514 -
2 AR-D0-02 8,722.867 27,070.522 1,628.380
3 SR-D6-03 3,894.430 15,589.702 -
2 Muara Dua
1 AR-D0-04 12,011.762 24,878.007 1,310.166
2 SR-D6-03 4,099.130 15,563.030 -
3 AR-D0-03 4,740.908 18,407.366 -
3 Drainase Belanda
1 PK-D0-01 10,865.481 33,821.349 9,234.931
4 Parit 3
1 KI-D4-06 5,550.700 22,075.133 -
2 KI-D2-01 6,160.671 15,840.793 9,134.569
3 KT-D1-01 930.932 - 3,850.336
4 KI-D1-02 4,430.636 17,726.976 -
5 KI-D1-04 2,075.659 2,070.941 5,843.547
6 KI-D1-05 1,173.602 4,724.921 -
5 Anak Muara Gambus
1 GB-D0-08 1,770.605 - 8,996.443
6 Titik Payung
1 GB-D0-04 4,255.431 - 19,804.777
7 Muara Pandan
1 SR-D7-02 5,953.990 20,543.044 2,778.733
2 SR-D7-06 1,356.972 3,940.952 2,256.337
8 Muara Tampus
1 SR-D7-02 8,839.309 39,349.562 4,113.320
2 KI-D4-15 5,977.095 32,348.036 -
3 SR-D7-01 2,271.455 11,205.086 -
9 Anak Muara Dalu Dalu
1 KI-D4-07 41,849.844 191,755.983 -
Total 150,948.813 551,439.917 68,951.540
Total (ha) 15.095
Luas Quarry (ha) 13.786
No Nama Item Luas (m2) Tanah Merah (m3) Pasir Muara (m3)
* 14 jam bekerja/hari
No. Item Unit Volume Coefficient n Days Months Years
I Land Clearing
1.1 Demolition of Palm Oil Tree
1.1.1 Dusun I Kuala Tanjung m3 4,742.8 0.0893 1 30.00 1.00 0.08
1.1.2 Dusun I Kuala Indah m3 13,963.6 0.0893 3 30.00 1.00 0.08
1.1.3 Dusun II Kuala Indah m3 11,593.6 0.0893 2 30.00 1.00 0.08
1.1.4 Dusun IV Kuala Indah m3 23,885.9 0.0893 5 30.00 1.00 0.08
1.1.5 Dusun VI Suka Ramai m3 22,402.6 0.0893 5 30.00 1.00 0.08
1.1.6 Dusun VII Suka Ramai m3 14,974.6 0.0893 3 30.00 1.00 0.08
1.1.7 Desa Tanjung Harapan m3 27,855.1 0.0893 6 30.00 1.00 0.08
1.1.8 Desa Aras m3 29,360.8 0.0893 6 30.00 1.00 0.08
1.1.9 Desa Pematang Kruing m3 10,602.1 0.0893 2 30.00 1.00 0.08
1.1.10 Desa Gambus Laut m3 24,776.2 0.0893 5 30.00 1.00 0.08
1.2 Disposal of Oil Palm Tree
1.2.1 Dusun I Kuala Tanjung m3 4,742.8
1.2.2 Dusun I Kuala Indah m3 13,963.6
1.2.3 Dusun II Kuala Indah m3 11,593.6
1.2.4 Dusun IV Kuala Indah m3 23,885.9
1.2.5 Dusun VI Suka Ramai m3 22,402.6
1.2.6 Dusun VII Suka Ramai m3 14,974.6
1.2.7 Desa Tanjung Harapan m3 27,855.1
1.2.8 Desa Aras m3 29,360.8
1.2.9 Desa Pematang Kruing m3 10,602.1
1.2.10 Desa Gambus Laut m3 24,776.2
1.3 Stripping /Cutting Top Soil
A Pekerjaan Galian Tanah Top Soil
1.3.1 Dusun I Kuala Tanjung
1. KT-D1-01 m3 243,516.000 0.0223 13 30.00 1.00 0.08
2. KT-D1-02 m3 686,618.690 0.0223 36 30.00 1.00 0.08
1.3.2 Dusun I Kuala Indah
1. KI-D1-01 m3 170,639.4 0.0223 9 30.00 1.00 0.08
2. KI-D1-02 m3 176,887.6 0.0223 9 30.00 1.00 0.08
3 KI-D1-03 m3 58,060.3 0.0223 3 30.00 1.00 0.08
4. KI-D1-04 m3 198,972.8 0.0223 11 30.00 1.00 0.08
5. KI-D1-05 m3 349,772.6 0.0223 19 30.00 1.00 0.08
1.3.3 Dusun II Kuala Indah
1. KI-D2-01 m3 606,547.065 0.0223 32 30.00 1.00 0.08
2. KI-D2-02 m3 314,680.349 0.0223 17 30.00 1.00 0.08
3. KI-D2-03 m3 153,509.082 0.0223 8 30.00 1.00 0.08
1.3.4 Dusun IV Kuala Indah
1. KI-D4-01 m3 729,943.215 0.0223 39 30.00 1.00 0.08
2. KI-D4-02 m3 36,925.405 0.0223 2 30.00 1.00 0.08
3 KI-D4-03 m3 23,455.150 0.0223 1 30.00 1.00 0.08
4. KI-D4-04 m3 84,883.472 0.0223 5 30.00 1.00 0.08
5. KI-D4-05 m3 199,192.163 0.0223 11 30.00 1.00 0.08
6. KI-D4-06 m3 307,136.377 0.0223 16 30.00 1.00 0.08
7. KI-D4-07 m3 740,366.799 0.0223 39 30.00 1.00 0.08
8. KI-D4-08 m3 301,115.874 0.0223 16 30.00 1.00 0.08
9. KI-D4-09 m3 234,569.742 0.0223 12 30.00 1.00 0.08
10. KI-D4-10 m3 135,091.521 0.0223 7 30.00 1.00 0.08
11. KI-D4-11 m3 39,091.097 0.0223 2 30.00 1.00 0.08
12. KI-D4-12 m3 40,823.605 0.0223 2 30.00 1.00 0.08
13. KI-D4-13 m3 78,434.100 0.0223 4 30.00 1.00 0.08
14. KI-D4-14 m3 187,637.668 0.0223 10 30.00 1.00 0.08
15. KI-D4-15 m3 583,977.480 0.0223 31 30.00 1.00 0.08
16. KI-D4-16 m3 152,261.655 0.0223 8 30.00 1.00 0.08
1.3.5 Dusun VI Suka Ramai
1. SR-D6-01 m3 843,116.262 0.0223 45 30.00 1.00 0.08
2. SR-D6-02 m3 353,860.230 0.0223 19 30.00 1.00 0.08
3 SR-D6-03 m3 521,218.130 0.0223 28 30.00 1.00 0.08
1.3.6 Dusun VII Suka Ramai
1. SR-D7-01 m3 23,130.645 0.0223 1 30.00 1.00 0.08
2. SR-D7-02 m3 79,506.467 0.0223 4 30.00 1.00 0.08
3 SR-D7-03 m3 56,672.549 0.0223 3 30.00 1.00 0.08
4. SR-D7-04 m3 90,129.001 0.0223 5 30.00 1.00 0.08
5. SR-D7-05 m3 65,575.506 0.0223 3 30.00 1.00 0.08
6. SR-D7-06 m3 67,324.669 0.0223 4 30.00 1.00 0.08
7. SR-D7-07 m3 151,679.460 0.0223 8 30.00 1.00 0.08
8. SR-D7-08 m3 59,194.004 0.0223 3 30.00 1.00 0.08
1.3.7 Desa Tanjung Harapan
1. TH-D0-01 m3 2,090,231.020 0.0223 111 30.00 1.00 0.08
2. TH-D0-02 m3 1,329,684.880 0.0223 71 30.00 1.00 0.08
1.3.8 Desa Aras
1. AR-D0-01 m3 170,918.850 0.0223 9 30.00 1.00 0.08
2. AR-D0-02 m3 595,634.670 0.0223 32 30.00 1.00 0.08
3 AR-D0-03 m3 179,486.480 0.0223 10 30.00 1.00 0.08
4. AR-D0-04 m3 522,999.351 0.0223 28 30.00 1.00 0.08
1.3.9 Desa Pematang Kuing
1. PK-D0-01 m3 899,805.3 0.0223 48 30.00 1.00 0.08
1.3.10 Desa Gambus Laut
1. GB-D0-01 m3 193,914.053 0.0223 10 30.00 1.00 0.08
2. GB-D0-02 m3 23,851.025 0.0223 1 30.00 1.00 0.08
3 GB-D0-03 m3 150,700.496 0.0223 8 30.00 1.00 0.08
4. GB-D0-04 m3 77,580.684 0.0223 4 30.00 1.00 0.08
5. GB-D0-05 m3 25,827.147 0.0223 1 30.00 1.00 0.08
6. GB-D0-06 m3 28,878.229 0.0223 2 30.00 1.00 0.08
7. GB-D0-07 m3 56,566.178 0.0223 3 30.00 1.00 0.08
8. GB-D0-08 m3 15,879.486 0.0223 1 30.00 1.00 0.08
9. GB-D0-09 m3 5,974.301 0.0223 0 30.00 1.00 0.08
10. GB-D0-10 m3 8,525.481 0.0223 0 30.00 1.00 0.08
11. GB-D0-11 m3 6,473.021 0.0223 0 30.00 1.00 0.08
B Pengangkatan Tanah Top Soil ke Bak DT
1.3.1 Dusun I Kuala Tanjung
1. KT-D1-01 m3 245,887.415 0.1606 94 30.00 1.00 0.08
2. KT-D1-02 m3 688,990.105 0.1606 264 30.00 1.00 0.08
1.3.2 Dusun I Kuala Indah
1. KI-D1-01 m3 173,432.2 0.1606 66 30.00 1.00 0.08
2. KI-D1-02 m3 179,680.3 0.1606 69 30.00 1.00 0.08
3 KI-D1-03 m3 60,853.0 0.1606 23 30.00 1.00 0.08
4. KI-D1-04 m3 201,765.5 0.1606 77 30.00 1.00 0.08
5. KI-D1-05 m3 352,565.3 0.1606 135 30.00 1.00 0.08
1.3.3 Dusun II Kuala Indah
1. KI-D2-01 m3 610,411.602 0.1606 233 30.00 1.00 0.08
2. KI-D2-02 m3 318,544.886 0.1606 122 30.00 1.00 0.08
3. KI-D2-03 m3 157,373.619 0.1606 60 30.00 1.00 0.08
1.3.4 Dusun IV Kuala Indah
1. KI-D4-01 m3 731,436.085 0.1606 280 30.00 1.00 0.08
2. KI-D4-02 m3 38,418.275 0.1606 15 30.00 1.00 0.08
3 KI-D4-03 m3 24,948.020 0.1606 10 30.00 1.00 0.08
4. KI-D4-04 m3 86,376.341 0.1606 33 30.00 1.00 0.08
5. KI-D4-05 m3 200,685.033 0.1606 77 30.00 1.00 0.08
6. KI-D4-06 m3 308,629.247 0.1606 118 30.00 1.00 0.08
7. KI-D4-07 m3 741,859.669 0.1606 284 30.00 1.00 0.08
8. KI-D4-08 m3 302,608.744 0.1606 116 30.00 1.00 0.08
9. KI-D4-09 m3 236,062.612 0.1606 90 30.00 1.00 0.08
10. KI-D4-10 m3 136,584.391 0.1606 52 30.00 1.00 0.08
11. KI-D4-11 m3 40,583.967 0.1606 16 30.00 1.00 0.08
12. KI-D4-12 m3 42,316.475 0.1606 16 30.00 1.00 0.08
13. KI-D4-13 m3 79,926.970 0.1606 31 30.00 1.00 0.08
14. KI-D4-14 m3 189,130.538 0.1606 72 30.00 1.00 0.08
15. KI-D4-15 m3 585,470.350 0.1606 224 30.00 1.00 0.08
16. KI-D4-16 m3 153,754.525 0.1606 59 30.00 1.00 0.08
1.3.5 Dusun VI Suka Ramai
1. SR-D6-01 m3 850,583.796 0.1606 325 30.00 1.00 0.08
2. SR-D6-02 m3 361,327.764 0.1606 138 30.00 1.00 0.08
3 SR-D6-03 m3 528,685.664 0.1606 202 30.00 1.00 0.08
1.3.6 Dusun VII Suka Ramai
1. SR-D7-01 m3 25,002.471 0.1606 10 30.00 1.00 0.08
2. SR-D7-02 m3 81,378.293 0.1606 31 30.00 1.00 0.08
3 SR-D7-03 m3 58,544.375 0.1606 22 30.00 1.00 0.08
4. SR-D7-04 m3 92,000.827 0.1606 35 30.00 1.00 0.08
5. SR-D7-05 m3 67,447.332 0.1606 26 30.00 1.00 0.08
6. SR-D7-06 m3 69,196.495 0.1606 26 30.00 1.00 0.08
7. SR-D7-07 m3 153,551.286 0.1606 59 30.00 1.00 0.08
8. SR-D7-08 m3 61,065.830 0.1606 23 30.00 1.00 0.08
1.3.7 Desa Tanjung Harapan
1. TH-D0-01 m3 2,104,158.578 0.1606 805 30.00 1.00 0.08
2. TH-D0-02 m3 1,343,612.438 0.1606 514 30.00 1.00 0.08
1.3.8 Desa Aras 0.1606
1. AR-D0-01 m3 178,259.045 0.1606 68 30.00 1.00 0.08
2. AR-D0-02 m3 602,974.865 0.1606 231 30.00 1.00 0.08
3 AR-D0-03 m3 186,826.675 0.1606 71 30.00 1.00 0.08
4. AR-D0-04 m3 530,339.546 0.1606 203 30.00 1.00 0.08
1.3.9 Desa Pematang Kuing
1. PK-D0-01 m3 910,407.4 0.1606 348 30.00 1.00 0.08
1.3.10 Desa Gambus Laut
1. GB-D0-01 m3 196,166.432 0.1606 75 30.00 1.00 0.08
2. GB-D0-02 m3 26,103.405 0.1606 10 30.00 1.00 0.08
3 GB-D0-03 m3 152,952.875 0.1606 58 30.00 1.00 0.08
4. GB-D0-04 m3 79,833.063 0.1606 31 30.00 1.00 0.08
5. GB-D0-05 m3 28,079.526 0.1606 11 30.00 1.00 0.08
6. GB-D0-06 m3 31,130.608 0.1606 12 30.00 1.00 0.08
7. GB-D0-07 m3 58,818.557 0.1606 22 30.00 1.00 0.08
8. GB-D0-08 m3 18,131.865 0.1606 7 30.00 1.00 0.08
9. GB-D0-09 m3 8,226.681 0.1606 3 30.00 1.00 0.08
10. GB-D0-10 m3 10,777.860 0.1606 4 30.00 1.00 0.08
11. GB-D0-11 m3 8,725.400 0.1606 3 30.00 1.00 0.08
B Pengangkatan Tanah ke Bak DT Dan DT angkut material dari lokasi pekerjaan ke TPA
1.3.1 Dusun I Kuala Tanjung
1. KT-D1-01 m3 245,887.415 0.0223 13 30.00 1.00 0.08
2. KT-D1-02 m3 688,990.105 0.0223 37 30.00 1.00 0.08
1.3.2 Dusun I Kuala Indah
1. KI-D1-01 m3 173,432.2 0.0223 9 30.00 1.00 0.08
2. KI-D1-02 m3 179,680.3 0.0223 10 30.00 1.00 0.08
3 KI-D1-03 m3 60,853.0 0.0223 3 30.00 1.00 0.08
4. KI-D1-04 m3 201,765.5 0.0223 11 30.00 1.00 0.08
5. KI-D1-05 m3 352,565.3 0.0223 19 30.00 1.00 0.08
1.3.3 Dusun II Kuala Indah
1. KI-D2-01 m3 610,411.602 0.0223 32 30.00 1.00 0.08
2. KI-D2-02 m3 318,544.886 0.0223 17 30.00 1.00 0.08
3. KI-D2-03 m3 157,373.619 0.0223 8 30.00 1.00 0.08
1.3.4 Dusun IV Kuala Indah
1. KI-D4-01 m3 731,436.085 0.0223 39 30.00 1.00 0.08
2. KI-D4-02 m3 38,418.275 0.0223 2 30.00 1.00 0.08
3 KI-D4-03 m3 24,948.020 0.0223 1 30.00 1.00 0.08
4. KI-D4-04 m3 86,376.341 0.0223 5 30.00 1.00 0.08
5. KI-D4-05 m3 200,685.033 0.0223 11 30.00 1.00 0.08
6. KI-D4-06 m3 308,629.247 0.0223 16 30.00 1.00 0.08
7. KI-D4-07 m3 741,859.669 0.0223 39 30.00 1.00 0.08
8. KI-D4-08 m3 302,608.744 0.0223 16 30.00 1.00 0.08
9. KI-D4-09 m3 236,062.612 0.0223 13 30.00 1.00 0.08
10. KI-D4-10 m3 136,584.391 0.0223 7 30.00 1.00 0.08
11. KI-D4-11 m3 40,583.967 0.0223 2 30.00 1.00 0.08
12. KI-D4-12 m3 42,316.475 0.0223 2 30.00 1.00 0.08
13. KI-D4-13 m3 79,926.970 0.0223 4 30.00 1.00 0.08
14. KI-D4-14 m3 189,130.538 0.0223 10 30.00 1.00 0.08
15. KI-D4-15 m3 585,470.350 0.0223 31 30.00 1.00 0.08
16. KI-D4-16 m3 153,754.525 0.0223 8 30.00 1.00 0.08
1.3.5 Dusun VI Suka Ramai
1. SR-D6-01 m3 850,583.796 0.0223 45 30.00 1.00 0.08
2. SR-D6-02 m3 361,327.764 0.0223 19 30.00 1.00 0.08
3 SR-D6-03 m3 528,685.664 0.0223 28 30.00 1.00 0.08
1.3.6 Dusun VII Suka Ramai
1. SR-D7-01 m3 25,002.471 0.0223 1 30.00 1.00 0.08
2. SR-D7-02 m3 81,378.293 0.0223 4 30.00 1.00 0.08
3 SR-D7-03 m3 58,544.375 0.0223 3 30.00 1.00 0.08
4. SR-D7-04 m3 92,000.827 0.0223 5 30.00 1.00 0.08
5. SR-D7-05 m3 67,447.332 0.0223 4 30.00 1.00 0.08
6. SR-D7-06 m3 69,196.495 0.0223 4 30.00 1.00 0.08
7. SR-D7-07 m3 153,551.286 0.0223 8 30.00 1.00 0.08
8. SR-D7-08 m3 61,065.830 0.0223 3 30.00 1.00 0.08
1.3.7 Desa Tanjung Harapan 0.00 0.00
1. TH-D0-01 m3 2,104,158.578 0.0223 112 30.00 1.00 0.08
2. TH-D0-02 m3 1,343,612.438 0.0223 71 30.00 1.00 0.08
1.3.8 Desa Aras 0.0223 0.00 0.00
1. AR-D0-01 m3 178,259.045 0.0223 9 30.00 1.00 0.08
2. AR-D0-02 m3 602,974.865 0.0223 32 30.00 1.00 0.08
3 AR-D0-03 m3 186,826.675 0.0223 10 30.00 1.00 0.08
4. AR-D0-04 m3 530,339.546 0.0223 28 30.00 1.00 0.08
1.3.9 Desa Pematang Kuing
1. PK-D0-01 m3 910,407.4 0.0223 48 30.00 1.00 0.08
1.3.10 Desa Gambus Laut
1. GB-D0-01 m3 196,166.432 0.0223 10 30.00 1.00 0.08
2. GB-D0-02 m3 26,103.405 0.0223 1 30.00 1.00 0.08
3 GB-D0-03 m3 152,952.875 0.0223 8 30.00 1.00 0.08
4. GB-D0-04 m3 79,833.063 0.0223 4 30.00 1.00 0.08
5. GB-D0-05 m3 28,079.526 0.0223 1 30.00 1.00 0.08
6. GB-D0-06 m3 31,130.608 0.0223 2 30.00 1.00 0.08
7. GB-D0-07 m3 58,818.557 0.0223 3 30.00 1.00 0.08
8. GB-D0-08 m3 18,131.865 0.0223 1 30.00 1.00 0.08
9. GB-D0-09 m3 8,226.681 0.0223 0 30.00 1.00 0.08
10. GB-D0-10 m3 10,777.860 0.0223 1 30.00 1.00 0.08
11. GB-D0-11 m3 8,725.400 0.0223 0 30.00 1.00 0.08
C Tanah Dihampar, diratakan dan Merapikan Tanah Stripping Di TPA
1.3.1 Dusun I Kuala Tanjung
1. KT-D1-01 m3 245,887.4 0.0095 6 30.00 1.00 0.08
2. KT-D1-02 m3 688,990.1 0.0095 16 30.00 1.00 0.08
1.3.2 Dusun I Kuala Indah
1. KI-D1-01 m3 173,432.2 0.0095 4 30.00 1.00 0.08
2. KI-D1-02 m3 179,680.3 0.0095 4 30.00 1.00 0.08
3 KI-D1-03 m3 60,853.0 0.0095 1 30.00 1.00 0.08
4. KI-D1-04 m3 201,765.5 0.0095 5 30.00 1.00 0.08
5. KI-D1-05 m3 352,565.3 0.0095 8 30.00 1.00 0.08
1.3.3 Dusun II Kuala Indah
1. KI-D2-01 m3 610,411.6 0.0095 14 30.00 1.00 0.08
2. KI-D2-02 m3 318,544.9 0.0095 7 30.00 1.00 0.08
3. KI-D2-03 m3 157,373.6 0.0095 4 30.00 1.00 0.08
1.3.4 Dusun IV Kuala Indah
1. KI-D4-01 m3 731,436.1 0.0095 17 30.00 1.00 0.08
2. KI-D4-02 m3 38,418.3 0.0095 1 30.00 1.00 0.08
3 KI-D4-03 m3 24,948.0 0.0095 1 30.00 1.00 0.08
4. KI-D4-04 m3 86,376.3 0.0095 2 30.00 1.00 0.08
5. KI-D4-05 m3 200,685.0 0.0095 5 30.00 1.00 0.08
6. KI-D4-06 m3 308,629.2 0.0095 7 30.00 1.00 0.08
7. KI-D4-07 m3 741,859.7 0.0095 17 30.00 1.00 0.08
8. KI-D4-08 m3 302,608.7 0.0095 7 30.00 1.00 0.08
9. KI-D4-09 m3 236,062.6 0.0095 5 30.00 1.00 0.08
10. KI-D4-10 m3 136,584.4 0.0095 3 30.00 1.00 0.08
11. KI-D4-11 m3 40,584.0 0.0095 1 30.00 1.00 0.08
12. KI-D4-12 m3 42,316.5 0.0095 1 30.00 1.00 0.08
13. KI-D4-13 m3 79,927.0 0.0095 2 30.00 1.00 0.08
14. KI-D4-14 m3 189,130.5 0.0095 4 30.00 1.00 0.08
15. KI-D4-15 m3 585,470.3 0.0095 13 30.00 1.00 0.08
16. KI-D4-16 m3 153,754.5 0.0095 3 30.00 1.00 0.08
1.3.5 Dusun VI Suka Ramai
1. SR-D6-01 m3 850,583.8 0.0095 19 30.00 1.00 0.08
2. SR-D6-02 m3 361,327.8 0.0095 8 30.00 1.00 0.08
3 SR-D6-03 m3 528,685.7 0.0095 12 30.00 1.00 0.08
1.3.6 Dusun VII Suka Ramai
1. SR-D7-01 m3 25,002.5 0.0095 1 30.00 1.00 0.08
2. SR-D7-02 m3 81,378.3 0.0095 2 30.00 1.00 0.08
3 SR-D7-03 m3 58,544.4 0.0095 1 30.00 1.00 0.08
4. SR-D7-04 m3 92,000.8 0.0095 2 30.00 1.00 0.08
5. SR-D7-05 m3 67,447.3 0.0095 2 30.00 1.00 0.08
6. SR-D7-06 m3 69,196.5 0.0095 2 30.00 1.00 0.08
7. SR-D7-07 m3 153,551.3 0.0095 3 30.00 1.00 0.08
8. SR-D7-08 m3 61,065.8 0.0095 1 30.00 1.00 0.08
1.3.7 Desa Tanjung Harapan
1. TH-D0-01 m3 2,104,158.6 0.0095 48 30.00 1.00 0.08
2. TH-D0-02 m3 1,343,612.4 0.0095 31 30.00 1.00 0.08
1.3.8 Desa Aras 0.0095
1. AR-D0-01 m3 178,259.0 0.0095 4 30.00 1.00 0.08
2. AR-D0-02 m3 602,974.9 0.0095 14 30.00 1.00 0.08
3 AR-D0-03 m3 186,826.7 0.0095 4 30.00 1.00 0.08
4. AR-D0-04 m3 530,339.5 0.0095 12 30.00 1.00 0.08
1.3.9 Desa Pematang Kuing
1. PK-D0-01 m3 910,407.4 0.0095 21 30.00 1.00 0.08
1.3.10 Desa Gambus Laut
1. GB-D0-01 m3 196,166.4 0.0095 4 30.00 1.00 0.08
2. GB-D0-02 m3 26,103.4 0.0095 1 30.00 1.00 0.08
3 GB-D0-03 m3 152,952.9 0.0095 3 30.00 1.00 0.08
4. GB-D0-04 m3 79,833.1 0.0095 2 30.00 1.00 0.08
5. GB-D0-05 m3 28,079.5 0.0095 1 30.00 1.00 0.08
6. GB-D0-06 m3 31,130.6 0.0095 1 30.00 1.00 0.08
7. GB-D0-07 m3 58,818.6 0.0095 1 30.00 1.00 0.08
8. GB-D0-08 m3 18,131.9 0.0095 0 30.00 1.00 0.08
9. GB-D0-09 m3 8,226.7 0.0095 0 30.00 1.00 0.08
10. GB-D0-10 m3 10,777.9 0.0095 0 30.00 1.00 0.08
11. GB-D0-11 m3 8,725.4 0.0095 0 30.00 1.00 0.08
1.4 Cut, Fill And Compaction
A Penggalian Tanah Di Borrow Area (Quary)
1.3.1 Dusun I Kuala Tanjung
1. KT-D1-01 m3 354,901.596 0.0223 19 30.00 1.00 0.08
2. KT-D1-02 m3 797,263.177 0.0223 42 30.00 1.00 0.08
1.3.2 Dusun I Kuala Indah
1. KI-D1-01 m3 325,283.763 0.0223 17 30.00 1.00 0.08
2. KI-D1-02 m3 372,207.455 0.0223 20 30.00 1.00 0.08
3 KI-D1-03 m3 116,979.628 0.0223 6 30.00 1.00 0.08
4. KI-D1-04 m3 421,054.225 0.0223 22 30.00 1.00 0.08
5. KI-D1-05 m3 708,014.859 0.0223 38 30.00 1.00 0.08
1.3.3 Dusun II Kuala Indah
1. KI-D2-01 m3 1,261,091.129 0.0223 67 30.00 1.00 0.08
2. KI-D2-02 m3 562,773.404 0.0223 30 30.00 1.00 0.08
3. KI-D2-03 m3 231,740.035 0.0223 12 30.00 1.00 0.08
1.3.4 Dusun IV Kuala Indah
1. KI-D4-01 m3 2,067,683.682 0.0223 110 30.00 1.00 0.08
2. KI-D4-02 m3 65,638.301 0.0223 3 30.00 1.00 0.08
3 KI-D4-03 m3 45,040.479 0.0223 2 30.00 1.00 0.08
4. KI-D4-04 m3 157,958.555 0.0223 8 30.00 1.00 0.08
5. KI-D4-05 m3 381,310.357 0.0223 20 30.00 1.00 0.08
6. KI-D4-06 m3 579,379.108 0.0223 31 30.00 1.00 0.08
7. KI-D4-07 m3 969,364.169 0.0223 52 30.00 1.00 0.08
8. KI-D4-08 m3 662,275.432 0.0223 35 30.00 1.00 0.08
9. KI-D4-09 m3 542,013.656 0.0223 29 30.00 1.00 0.08
10. KI-D4-10 m3 283,560.338 0.0223 15 30.00 1.00 0.08
11. KI-D4-11 m3 79,344.475 0.0223 4 30.00 1.00 0.08
12. KI-D4-12 m3 156,874.508 0.0223 8 30.00 1.00 0.08
13. KI-D4-13 m3 340,662.139 0.0223 18 30.00 1.00 0.08
14. KI-D4-14 m3 590,402.495 0.0223 31 30.00 1.00 0.08
15. KI-D4-15 m3 895,290.707 0.0223 48 30.00 1.00 0.08
16. KI-D4-16 m3 548,945.043 0.0223 29 30.00 1.00 0.08
1.3.5 Dusun VI Suka Ramai
1. SR-D6-01 m3 1,486,662.304 0.0223 79 30.00 1.00 0.08
2. SR-D6-02 m3 597,461.044 0.0223 32 30.00 1.00 0.08
3 SR-D6-03 m3 629,066.433 0.0223 33 30.00 1.00 0.08
1.3.6 Dusun VII Suka Ramai
1. SR-D7-01 m3 71,083.853 0.0223 4 30.00 1.00 0.08
2. SR-D7-02 m3 368,767.015 0.0223 20 30.00 1.00 0.08
3 SR-D7-03 m3 182,919.746 0.0223 10 30.00 1.00 0.08
4. SR-D7-04 m3 408,590.491 0.0223 22 30.00 1.00 0.08
5. SR-D7-05 m3 220,175.677 0.0223 12 30.00 1.00 0.08
6. SR-D7-06 m3 391,607.062 0.0223 21 30.00 1.00 0.08
7. SR-D7-07 m3 651,270.155 0.0223 35 30.00 1.00 0.08
8. SR-D7-08 m3 192,259.290 0.0223 10 30.00 1.00 0.08
1.3.7 Desa Tanjung Harapan
1. TH-D0-01 m3 2,466,062.627 0.0223 131 30.00 1.00 0.08
2. TH-D0-02 m3 1,596,743.246 0.0223 85 30.00 1.00 0.08
1.3.8 Desa Aras 0.0223
1. AR-D0-01 m3 242,559.964 0.0223 13 30.00 1.00 0.08
2. AR-D0-02 m3 452,335.939 0.0223 24 30.00 1.00 0.08
3 AR-D0-03 m3 317,181.259 0.0223 17 30.00 1.00 0.08
4. AR-D0-04 m3 421,217.317 0.0223 22 30.00 1.00 0.08
1.3.9 Desa Pematang Kuing
1. PK-D0-01 m3 1213707.074426 0.0223 65 30.00 1.00 0.08
1.3.10 Desa Gambus Laut
1. GB-D0-01 m3 1,108,994.593 0.0223 59 30.00 1.00 0.08
2. GB-D0-02 m3 121,342.520 0.0223 6 30.00 1.00 0.08
3 GB-D0-03 m3 728,056.423 0.0223 39 30.00 1.00 0.08
4. GB-D0-04 m3 494,204.078 0.0223 26 30.00 1.00 0.08
5. GB-D0-05 m3 103,440.152 0.0223 5 30.00 1.00 0.08
6. GB-D0-06 m3 185,008.051 0.0223 10 30.00 1.00 0.08
7. GB-D0-07 m3 229,176.658 0.0223 12 30.00 1.00 0.08
8. GB-D0-08 m3 99,890.226 0.0223 5 30.00 1.00 0.08
9. GB-D0-09 m3 21,913.270 0.0223 1 30.00 1.00 0.08
10. GB-D0-10 m3 31,289.623 0.0223 2 30.00 1.00 0.08
11. GB-D0-11 m3 18,714.335 0.0223 1 30.00 1.00 0.08
B DT angkut material dari BA ke lokasi pekerjaan, jarak 30 km
1.3.1 Dusun I Kuala Tanjung
1. KT-D1-01 m3 354,901.596 0.1606 136 30.00 1.00 0.08
2. KT-D1-02 m3 797,263.177 0.1606 305 30.00 1.00 0.08
1.3.2 Dusun I Kuala Indah
1. KI-D1-01 m3 325,283.763 0.1606 124 30.00 1.00 0.08
2. KI-D1-02 m3 372,207.455 0.1606 142 30.00 1.00 0.08
3 KI-D1-03 m3 116,979.628 0.1606 45 30.00 1.00 0.08
4. KI-D1-04 m3 421,054.225 0.1606 161 30.00 1.00 0.08
5. KI-D1-05 m3 708,014.859 0.1606 271 30.00 1.00 0.08
1.3.3 Dusun II Kuala Indah
1. KI-D2-01 m3 1,261,091.129 0.1606 482 30.00 1.00 0.08
2. KI-D2-02 m3 562,773.404 0.1606 215 30.00 1.00 0.08
3. KI-D2-03 m3 231,740.035 0.1606 89 30.00 1.00 0.08
1.3.4 Dusun IV Kuala Indah
1. KI-D4-01 m3 2,067,683.682 0.1606 791 30.00 1.00 0.08
2. KI-D4-02 m3 65,638.301 0.1606 25 30.00 1.00 0.08
3 KI-D4-03 m3 45,040.479 0.1606 17 30.00 1.00 0.08
4. KI-D4-04 m3 157,958.555 0.1606 60 30.00 1.00 0.08
5. KI-D4-05 m3 381,310.357 0.1606 146 30.00 1.00 0.08
6. KI-D4-06 m3 579,379.108 0.1606 222 30.00 1.00 0.08
7. KI-D4-07 m3 969,364.169 0.1606 371 30.00 1.00 0.08
8. KI-D4-08 m3 662,275.432 0.1606 253 30.00 1.00 0.08
9. KI-D4-09 m3 542,013.656 0.1606 207 30.00 1.00 0.08
10. KI-D4-10 m3 283,560.338 0.1606 108 30.00 1.00 0.08
11. KI-D4-11 m3 79,344.475 0.1606 30 30.00 1.00 0.08
12. KI-D4-12 m3 156,874.508 0.1606 60 30.00 1.00 0.08
13. KI-D4-13 m3 340,662.139 0.1606 130 30.00 1.00 0.08
14. KI-D4-14 m3 590,402.495 0.1606 226 30.00 1.00 0.08
15. KI-D4-15 m3 895,290.707 0.1606 342 30.00 1.00 0.08
16. KI-D4-16 m3 548,945.043 0.1606 210 30.00 1.00 0.08
1.3.5 Dusun VI Suka Ramai
1. SR-D6-01 m3 1,486,662.304 0.1606 569 30.00 1.00 0.08
2. SR-D6-02 m3 597,461.044 0.1606 229 30.00 1.00 0.08
3 SR-D6-03 m3 629,066.433 0.1606 241 30.00 1.00 0.08
1.3.6 Dusun VII Suka Ramai
1. SR-D7-01 m3 71,083.853 0.1606 27 30.00 1.00 0.08
2. SR-D7-02 m3 368,767.015 0.1606 141 30.00 1.00 0.08
3 SR-D7-03 m3 182,919.746 0.1606 70 30.00 1.00 0.08
4. SR-D7-04 m3 408,590.491 0.1606 156 30.00 1.00 0.08
5. SR-D7-05 m3 220,175.677 0.1606 84 30.00 1.00 0.08
6. SR-D7-06 m3 391,607.062 0.1606 150 30.00 1.00 0.08
7. SR-D7-07 m3 651,270.155 0.1606 249 30.00 1.00 0.08
8. SR-D7-08 m3 192,259.290 0.1606 74 30.00 1.00 0.08
1.3.7 Desa Tanjung Harapan
1. TH-D0-01 m3 2,466,062.627 0.1606 943 30.00 1.00 0.08
2. TH-D0-02 m3 1,596,743.246 0.1606 611 30.00 1.00 0.08
1.3.8 Desa Aras 0.1606
1. AR-D0-01 m3 242,559.964 0.1606 93 30.00 1.00 0.08
2. AR-D0-02 m3 452,335.939 0.1606 173 30.00 1.00 0.08
3 AR-D0-03 m3 317,181.259 0.1606 121 30.00 1.00 0.08
4. AR-D0-04 m3 421,217.317 0.1606 161 30.00 1.00 0.08
1.3.9 Desa Pematang Kuing
1. PK-D0-01 m3 1213707.074426 0.1606 464 30.00 1.00 0.08
1.3.10 Desa Gambus Laut
1. GB-D0-01 m3 1,108,994.593 0.1606 424 30.00 1.00 0.08
2. GB-D0-02 m3 121,342.520 0.1606 46 30.00 1.00 0.08
3 GB-D0-03 m3 728,056.423 0.1606 278 30.00 1.00 0.08
4. GB-D0-04 m3 494,204.078 0.1606 189 30.00 1.00 0.08
5. GB-D0-05 m3 103,440.152 0.1606 40 30.00 1.00 0.08
6. GB-D0-06 m3 185,008.051 0.1606 71 30.00 1.00 0.08
7. GB-D0-07 m3 229,176.658 0.1606 88 30.00 1.00 0.08
8. GB-D0-08 m3 99,890.226 0.1606 38 30.00 1.00 0.08
9. GB-D0-09 m3 21,913.270 0.1606 8 30.00 1.00 0.08
10. GB-D0-10 m3 31,289.623 0.1606 12 30.00 1.00 0.08
11. GB-D0-11 m3 18,714.335 0.1606 7 30.00 1.00 0.08
C Pemadatan tanah di lokasi pekerjaan (m3)
1.3.1 Dusun I Kuala Tanjung
1. KT-D1-01 m3 354,901.596 0.0191 16 30.00 1.00 0.08
2. KT-D1-02 m3 797,263.177 0.0191 36 30.00 1.00 0.08
1.3.2 Dusun I Kuala Indah
1. KI-D1-01 m3 325,283.763 0.0191 15 30.00 1.00 0.08
2. KI-D1-02 m3 372,207.455 0.0191 17 30.00 1.00 0.08
3 KI-D1-03 m3 116,979.628 0.0191 5 30.00 1.00 0.08
4. KI-D1-04 m3 421,054.225 0.0191 19 30.00 1.00 0.08
5. KI-D1-05 m3 708,014.859 0.0191 32 30.00 1.00 0.08
1.3.3 Dusun II Kuala Indah
1. KI-D2-01 m3 1,261,091.129 0.0191 57 30.00 1.00 0.08
2. KI-D2-02 m3 562,773.404 0.0191 26 30.00 1.00 0.08
3. KI-D2-03 m3 231,740.035 0.0191 11 30.00 1.00 0.08
1.3.4 Dusun IV Kuala Indah
1. KI-D4-01 m3 2,067,683.682 0.0191 94 30.00 1.00 0.08
2. KI-D4-02 m3 65,638.301 0.0191 3 30.00 1.00 0.08
3 KI-D4-03 m3 45,040.479 0.0191 2 30.00 1.00 0.08
4. KI-D4-04 m3 157,958.555 0.0191 7 30.00 1.00 0.08
5. KI-D4-05 m3 381,310.357 0.0191 17 30.00 1.00 0.08
6. KI-D4-06 m3 579,379.108 0.0191 26 30.00 1.00 0.08
7. KI-D4-07 m3 969,364.169 0.0191 44 30.00 1.00 0.08
8. KI-D4-08 m3 662,275.432 0.0191 30 30.00 1.00 0.08
9. KI-D4-09 m3 542,013.656 0.0191 25 30.00 1.00 0.08
10. KI-D4-10 m3 283,560.338 0.0191 13 30.00 1.00 0.08
11. KI-D4-11 m3 79,344.475 0.0191 4 30.00 1.00 0.08
12. KI-D4-12 m3 156,874.508 0.0191 7 30.00 1.00 0.08
13. KI-D4-13 m3 340,662.139 0.0191 15 30.00 1.00 0.08
14. KI-D4-14 m3 590,402.495 0.0191 27 30.00 1.00 0.08
15. KI-D4-15 m3 895,290.707 0.0191 41 30.00 1.00 0.08
16. KI-D4-16 m3 548,945.043 0.0191 25 30.00 1.00 0.08
1.3.5 Dusun VI Suka Ramai
1. SR-D6-01 m3 1,486,662.304 0.0191 68 30.00 1.00 0.08
2. SR-D6-02 m3 597,461.044 0.0191 27 30.00 1.00 0.08
3 SR-D6-03 m3 629,066.433 0.0191 29 30.00 1.00 0.08
1.3.6 Dusun VII Suka Ramai
1. SR-D7-01 m3 71,083.853 0.0191 3 30.00 1.00 0.08
2. SR-D7-02 m3 368,767.015 0.0191 17 30.00 1.00 0.08
3 SR-D7-03 m3 182,919.746 0.0191 8 30.00 1.00 0.08
4. SR-D7-04 m3 408,590.491 0.0191 19 30.00 1.00 0.08
5. SR-D7-05 m3 220,175.677 0.0191 10 30.00 1.00 0.08
6. SR-D7-06 m3 391,607.062 0.0191 18 30.00 1.00 0.08
7. SR-D7-07 m3 651,270.155 0.0191 30 30.00 1.00 0.08
8. SR-D7-08 m3 192,259.290 0.0191 9 30.00 1.00 0.08
1.3.7 Desa Tanjung Harapan
1. TH-D0-01 m3 2,466,062.627 0.0191 112 30.00 1.00 0.08
2. TH-D0-02 m3 1,596,743.246 0.0191 73 30.00 1.00 0.08
1.3.8 Desa Aras 0.0191
1. AR-D0-01 m3 242,559.964 0.0191 11 30.00 1.00 0.08
2. AR-D0-02 m3 452,335.939 0.0191 21 30.00 1.00 0.08
3 AR-D0-03 m3 317,181.259 0.0191 14 30.00 1.00 0.08
4. AR-D0-04 m3 421,217.317 0.0191 19 30.00 1.00 0.08
1.3.9 Desa Pematang Kuing
1. PK-D0-01 m3 1213707.074426 0.0191 55 30.00 1.00 0.08
1.3.10 Desa Gambus Laut
1. GB-D0-01 m3 1,108,994.593 0.0191 50 30.00 1.00 0.08
2. GB-D0-02 m3 121,342.520 0.0191 6 30.00 1.00 0.08
3 GB-D0-03 m3 728,056.423 0.0191 33 30.00 1.00 0.08
4. GB-D0-04 m3 494,204.078 0.0191 22 30.00 1.00 0.08
5. GB-D0-05 m3 103,440.152 0.0191 5 30.00 1.00 0.08
6. GB-D0-06 m3 185,008.051 0.0191 8 30.00 1.00 0.08
7. GB-D0-07 m3 229,176.658 0.0191 10 30.00 1.00 0.08
8. GB-D0-08 m3 99,890.226 0.0191 5 30.00 1.00 0.08
9. GB-D0-09 m3 21,913.270 0.0191 1 30.00 1.00 0.08
10. GB-D0-10 m3 31,289.623 0.0191 1 30.00 1.00 0.08
11. GB-D0-11 m3 18,714.335 0.0191 1 30.00 1.00 0.08
KAB. BATUBARA
PT. VARIA INTI PANCAR 180 21 180 180 180 180 180 180
PRIMER KOPERASI KARTIKA
KARYAWAN DAN VETERAN 180 10
KAB. ASAHAN
AMRAN 180 2 180 180
AGUS ARIS SUGIONO 180 2 180 180
CV. SULTAN SAMUDRA 180 2 180 180
ADITIA PRAHMANA 180 10
NELSON PAKPAHAN, ST 180 3
KAB. SERDANG BEDAGAI
Ir. LOSO 180 6 180 180 180 180 180 180
PT. VARIA INTI PANCAR 480 19 480 480 480 480 480 480
HENDY RIKIE LAM 180 10
KAB. SIMALUNGUN
Deposit Tanah Merah 720 23 720 720 720 720 720 720
Total kebutuhan trip perhari 1740 1740 1740 1740 1740 1740
Total Volume per bulan 1252800 1E+06 1E+06 ### ### 1E+06
27043200
Waktu Project (Bulan)
7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
180 180 180 180 180 180 180 180 180 180 180 180 180 180 180
180 180 180 180 180 180 180
180 180 180 180 180 180 180 180 180 180
180 180 180
480 480 480 480 480 480 480 480 480 480 480 480 480
180 180 180 180 180 180 180
720 720 720 720 720 720 720 720 720 720 720 720 720 720 720
1560 1560 1560 1560 1560 1560 1560 1560 1920 1920 1920 1920 1920 1260 1260
1E+06 1E+06 1E+06 1E+06 1E+06 1E+06 1E+06 1E+06 1E+06 1E+06 1E+06 1E+06 1E+06 9E+05 9E+05
22 23 24
720 720
1080 1080 360
8E+05 8E+05 3E+05
Asumsi Perhitungan Cemetery dimensi Luas
Luas 1 Unit 2x1 2 m2
Persentase Unit Per TPU 60%
Harga Upacara Kerohanian 10000000
Jam Kerja 14
No. Item Unit
I Land Clearing
1.1 Demolition of Palm Oil Tree
1.1.1 Dusun I Kuala Tanjung m3
1.1.2 Dusun I Kuala Indah m3
1.1.3 Dusun II Kuala Indah m3
1.1.4 Dusun IV Kuala Indah m3
1.1.5 Dusun VI Suka Ramai m3
1.1.6 Dusun VII Suka Ramai m3
1.1.7 Desa Tanjung Harapan m3
1.1.8 Desa Aras m3
1.1.9 Desa Pematang Kruing m3
1.1.10 Desa Gambus Laut m3
1.2 Disposal of Oil Palm Tree (Volume bongkaran pohon menjadi tambahan di stripping)
1.2.1 Dusun I Kuala Tanjung m3
1.2.2 Dusun I Kuala Indah m3
1.2.3 Dusun II Kuala Indah m3
1.2.4 Dusun IV Kuala Indah m3
1.2.5 Dusun VI Suka Ramai m3
1.2.6 Dusun VII Suka Ramai m3
1.2.7 Desa Tanjung Harapan m3
1.2.8 Desa Aras m3
1.2.9 Desa Pematang Kruing m3
1.2.10 Desa Gambus Laut m3
1.3 Stripping /Cutting Top Soil
A Pekerjaan Galian Tanah Top Soil
1.3.1 Dusun I Kuala Tanjung
1. KT-D1-01 m3
2. KT-D1-02 m3
1.3.2 Dusun I Kuala Indah
1. KI-D1-01 m3
2. KI-D1-02 m3
3 KI-D1-03 m3
4. KI-D1-04 m3
5. KI-D1-05 m3
1.3.3 Dusun II Kuala Indah
1. KI-D2-01 m3
2. KI-D2-02 m3
3. KI-D2-03 m3
1.3.4 Dusun IV Kuala Indah
1. KI-D4-01 m3
2. KI-D4-02 m3
3 KI-D4-03 m3
4. KI-D4-04 m3
5. KI-D4-05 m3
6. KI-D4-06 m3
7. KI-D4-07 m3
8. KI-D4-08 m3
9. KI-D4-09 m3
10. KI-D4-10 m3
11. KI-D4-11 m3
12. KI-D4-12 m3
13. KI-D4-13 m3
14. KI-D4-14 m3
15. KI-D4-15 m3
16. KI-D4-16 m3
1.3.5 Dusun VI Suka Ramai
1. SR-D6-01 m3
2. SR-D6-02 m3
3 SR-D6-03 m3
1.3.6 Dusun VII Suka Ramai
1. SR-D7-01 m3
2. SR-D7-02 m3
3 SR-D7-03 m3
4. SR-D7-04 m3
5. SR-D7-05 m3
6. SR-D7-06 m3
7. SR-D7-07 m3
8. SR-D7-08 m3
1.3.7 Desa Tanjung Harapan
1. TH-D0-01 m3
2. TH-D0-02 m3
1.3.8 Desa Aras
1. AR-D0-01 m3
2. AR-D0-02 m3
3 AR-D0-03 m3
4. AR-D0-04 m3
1.3.9 Desa Pematang Kuing
1. PK-D0-01 m3
1.3.10 Desa Gambus Laut
GB-D0-01 m3
GB-D0-02 m3
GB-D0-03 m3
GB-D0-04 m3
GB-D0-05 m3
GB-D0-06 m3
GB-D0-07 m3
GB-D0-08 m3
GB-D0-09 m3
GB-D0-10 m3
GB-D0-11 m3
B Pengangkatan Tanah ke Bak DT (sudah termasuk disposal sawit)
1.3.1 Dusun I Kuala Tanjung
1. KT-D1-01 m3
2. KT-D1-02 m3
1.3.2 Dusun I Kuala Indah
1. KI-D1-01 m3
2. KI-D1-02 m3
3 KI-D1-03 m3
4. KI-D1-04 m3
5. KI-D1-05 m3
1.3.3 Dusun II Kuala Indah
1. KI-D2-01 m3
2. KI-D2-02 m3
3. KI-D2-03 m3
1.3.4 Dusun IV Kuala Indah
1. KI-D4-01 m3
2. KI-D4-02 m3
3 KI-D4-03 m3
4. KI-D4-04 m3
5. KI-D4-05 m3
6. KI-D4-06 m3
7. KI-D4-07 m3
8. KI-D4-08 m3
9. KI-D4-09 m3
10. KI-D4-10 m3
11. KI-D4-11 m3
12. KI-D4-12 m3
13. KI-D4-13 m3
14. KI-D4-14 m3
15. KI-D4-15 m3
16. KI-D4-16 m3
1.3.5 Dusun VI Suka Ramai
1. SR-D6-01 m3
2. SR-D6-02 m3
3 SR-D6-03 m3
1.3.6 Dusun VII Suka Ramai
1. SR-D7-01 m3
2. SR-D7-02 m3
3 SR-D7-03 m3
4. SR-D7-04 m3
5. SR-D7-05 m3
6. SR-D7-06 m3
7. SR-D7-07 m3
8. SR-D7-08 m3
1.3.7 Desa Tanjung Harapan
1. TH-D0-01 m3
2. TH-D0-02 m3
1.3.8 Desa Aras
1. AR-D0-01 m3
2. AR-D0-02 m3
3 AR-D0-03 m3
4. AR-D0-04 m3
1.3.9 Desa Pematang Kuing
1. PK-D0-01 m3
1.3.10 Desa Gambus Laut
1. GB-D0-01 m3
2. GB-D0-02 m3
3 GB-D0-03 m3
4. GB-D0-04 m3
5. GB-D0-05 m3
6. GB-D0-06 m3
7. GB-D0-07 m3
8. GB-D0-08 m3
9. GB-D0-09 m3
10. GB-D0-10 m3
11. GB-D0-11 m3
C DT angkut material dari lokasi pekerjaan ke TPA (sudah termasuk disposal sawit)
1.3.1 Dusun I Kuala Tanjung
1. KT-D1-01 m3
2. KT-D1-02 m3
1.3.2 Dusun I Kuala Indah
1. KI-D1-01 m3
2. KI-D1-02 m3
3 KI-D1-03 m3
4. KI-D1-04 m3
5. KI-D1-05 m3
1.3.3 Dusun II Kuala Indah
1. KI-D2-01 m3
2. KI-D2-02 m3
3. KI-D2-03 m3
1.3.4 Dusun IV Kuala Indah
1. KI-D4-01 m3
2. KI-D4-02 m3
3 KI-D4-03 m3
4. KI-D4-04 m3
5. KI-D4-05 m3
6. KI-D4-06 m3
7. KI-D4-07 m3
8. KI-D4-08 m3
9. KI-D4-09 m3
10. KI-D4-10 m3
11. KI-D4-11 m3
12. KI-D4-12 m3
13. KI-D4-13 m3
14. KI-D4-14 m3
15. KI-D4-15 m3
16. KI-D4-16 m3
1.3.5 Dusun VI Suka Ramai
1. SR-D6-01 m3
2. SR-D6-02 m3
3 SR-D6-03 m3
1.3.6 Dusun VII Suka Ramai
1. SR-D7-01 m3
2. SR-D7-02 m3
3 SR-D7-03 m3
4. SR-D7-04 m3
5. SR-D7-05 m3
6. SR-D7-06 m3
7. SR-D7-07 m3
8. SR-D7-08 m3
1.3.7 Desa Tanjung Harapan
1. TH-D0-01 m3
2. TH-D0-02 m3
1.3.8 Desa Aras
1. AR-D0-01 m3
2. AR-D0-02 m3
3 AR-D0-03 m3
4. AR-D0-04 m3
1.3.9 Desa Pematang Kuing
1. PK-D0-01 m3
1.3.10 Desa Gambus Laut
1. GB-D0-01 m3
2. GB-D0-02 m3
3 GB-D0-03 m3
4. GB-D0-04 m3
5. GB-D0-05 m3
6. GB-D0-06 m3
7. GB-D0-07 m3
8. GB-D0-08 m3
9. GB-D0-09 m3
10. GB-D0-10 m3
11. GB-D0-11 m3
C Tanah Dihampar, diratakan dan Merapikan Tanah Stripping Di TPA
1.3.1 Dusun I Kuala Tanjung
1. KT-D1-01 m3
2. KT-D1-02 m3
1.3.2 Dusun I Kuala Indah
1. KI-D1-01 m3
2. KI-D1-02 m3
3 KI-D1-03 m3
4. KI-D1-04 m3
5. KI-D1-05 m3
1.3.3 Dusun II Kuala Indah
1. KI-D2-01 m3
2. KI-D2-02 m3
3. KI-D2-03 m3
1.3.4 Dusun IV Kuala Indah
1. KI-D4-01 m3
2. KI-D4-02 m3
3 KI-D4-03 m3
4. KI-D4-04 m3
5. KI-D4-05 m3
6. KI-D4-06 m3
7. KI-D4-07 m3
8. KI-D4-08 m3
9. KI-D4-09 m3
10. KI-D4-10 m3
11. KI-D4-11 m3
12. KI-D4-12 m3
13. KI-D4-13 m3
14. KI-D4-14 m3
15. KI-D4-15 m3
16. KI-D4-16 m3
1.3.5 Dusun VI Suka Ramai
1. SR-D6-01 m3
2. SR-D6-02 m3
3 SR-D6-03 m3
1.3.6 Dusun VII Suka Ramai
1. SR-D7-01 m3
2. SR-D7-02 m3
3 SR-D7-03 m3
4. SR-D7-04 m3
5. SR-D7-05 m3
6. SR-D7-06 m3
7. SR-D7-07 m3
8. SR-D7-08 m3
1.3.7 Desa Tanjung Harapan
1. TH-D0-01 m3
2. TH-D0-02 m3
1.3.8 Desa Aras
1. AR-D0-01 m3
2. AR-D0-02 m3
3 AR-D0-03 m3
4. AR-D0-04 m3
1.3.9 Desa Pematang Kuing
1. PK-D0-01 m3
1.3.10 Desa Gambus Laut
GB-D0-01 m3
GB-D0-02 m3
GB-D0-03 m3
GB-D0-04 m3
GB-D0-05 m3
GB-D0-06 m3
GB-D0-07 m3
GB-D0-08 m3
GB-D0-09 m3
GB-D0-10 m3
GB-D0-11 m3
1.4 Cut, Fill And Compaction
A Penggalian Tanah Di Borrow Area (Quary) Asumsi Tanah Merah
1.3.1 Dusun I Kuala Tanjung
1. KT-D1-01 m3
2. KT-D1-02 m3
1.3.2 Dusun I Kuala Indah
1. KI-D1-01 m3
2. KI-D1-02 m3
3 KI-D1-03 m3
4. KI-D1-04 m3
5. KI-D1-05 m3
1.3.3 Dusun II Kuala Indah
1. KI-D2-01 m3
2. KI-D2-02 m3
3. KI-D2-03 m3
1.3.4 Dusun IV Kuala Indah
1. KI-D4-01 m3
2. KI-D4-02 m3
3 KI-D4-03 m3
4. KI-D4-04 m3
5. KI-D4-05 m3
6. KI-D4-06 m3
7. KI-D4-07 m3
8. KI-D4-08 m3
9. KI-D4-09 m3
10. KI-D4-10 m3
11. KI-D4-11 m3
12. KI-D4-12 m3
13. KI-D4-13 m3
14. KI-D4-14 m3
15. KI-D4-15 m3
16. KI-D4-16 m3
1.3.5 Dusun VI Suka Ramai
1. SR-D6-01 m3
2. SR-D6-02 m3
3 SR-D6-03 m3
1.3.6 Dusun VII Suka Ramai
1. SR-D7-01 m3
2. SR-D7-02 m3
3 SR-D7-03 m3
4. SR-D7-04 m3
5. SR-D7-05 m3
6. SR-D7-06 m3
7. SR-D7-07 m3
8. SR-D7-08 m3
1.3.7 Desa Tanjung Harapan
1. TH-D0-01 m3
2. TH-D0-02 m3
1.3.8 Desa Aras
1. AR-D0-01 m3
2. AR-D0-02 m3
3 AR-D0-03 m3
4. AR-D0-04 m3
1.3.9 Desa Pematang Kuing
1. PK-D0-01 m3
1.3.10 Desa Gambus Laut
GB-D0-01 m3
GB-D0-02 m3
GB-D0-03 m3
GB-D0-04 m3
GB-D0-05 m3
GB-D0-06 m3
GB-D0-07 m3
GB-D0-08 m3
GB-D0-09 m3
GB-D0-10 m3
GB-D0-11 m3
B DT angkut material dari BA ke lokasi pekerjaan, jarak 30 km
1.3.1 Dusun I Kuala Tanjung
1. KT-D1-01 m3
2. KT-D1-02 m3
1.3.2 Dusun I Kuala Indah
1. KI-D1-01 m3
2. KI-D1-02 m3
3 KI-D1-03 m3
4. KI-D1-04 m3
5. KI-D1-05 m3
1.3.3 Dusun II Kuala Indah
1. KI-D2-01 m3
2. KI-D2-02 m3
3. KI-D2-03 m3
1.3.4 Dusun IV Kuala Indah
1. KI-D4-01 m3
2. KI-D4-02 m3
3 KI-D4-03 m3
4. KI-D4-04 m3
5. KI-D4-05 m3
6. KI-D4-06 m3
7. KI-D4-07 m3
8. KI-D4-08 m3
9. KI-D4-09 m3
10. KI-D4-10 m3
11. KI-D4-11 m3
12. KI-D4-12 m3
13. KI-D4-13 m3
14. KI-D4-14 m3
15. KI-D4-15 m3
16. KI-D4-16 m3
1.3.5 Dusun VI Suka Ramai
1. SR-D6-01 m3
2. SR-D6-02 m3
3 SR-D6-03 m3
1.3.6 Dusun VII Suka Ramai
1. SR-D7-01 m3
2. SR-D7-02 m3
3 SR-D7-03 m3
4. SR-D7-04 m3
5. SR-D7-05 m3
6. SR-D7-06 m3
7. SR-D7-07 m3
8. SR-D7-08 m3
1.3.7 Desa Tanjung Harapan
1. TH-D0-01 m3
2. TH-D0-02 m3
1.3.8 Desa Aras
1. AR-D0-01 m3
2. AR-D0-02 m3
3 AR-D0-03 m3
4. AR-D0-04 m3
1.3.9 Desa Pematang Kuing
1. PK-D0-01 m3
1.3.10 Desa Gambus Laut
1. GB-D0-01 m3
2. GB-D0-02 m3
3 GB-D0-03 m3
4. GB-D0-04 m3
5. GB-D0-05 m3
6. GB-D0-06 m3
7. GB-D0-07 m3
8. GB-D0-08 m3
9. GB-D0-09 m3
10. GB-D0-10 m3
11. GB-D0-11 m3
C Pemadatan tanah di lokasi pekerjaan (m3)
1.3.1 Dusun I Kuala Tanjung
1. KT-D1-01 m3
2. KT-D1-02 m3
1.3.2 Dusun I Kuala Indah
1. KI-D1-01 m3
2. KI-D1-02 m3
3 KI-D1-03 m3
4. KI-D1-04 m3
5. KI-D1-05 m3
1.3.3 Dusun II Kuala Indah
1. KI-D2-01 m3
2. KI-D2-02 m3
3. KI-D2-03 m3
1.3.4 Dusun IV Kuala Indah
1. KI-D4-01 m3
2. KI-D4-02 m3
3 KI-D4-03 m3
4. KI-D4-04 m3
5. KI-D4-05 m3
6. KI-D4-06 m3
7. KI-D4-07 m3
8. KI-D4-08 m3
9. KI-D4-09 m3
10. KI-D4-10 m3
11. KI-D4-11 m3
12. KI-D4-12 m3
13. KI-D4-13 m3
14. KI-D4-14 m3
15. KI-D4-15 m3
16. KI-D4-16 m3
1.3.5 Dusun VI Suka Ramai
1. SR-D6-01 m3
2. SR-D6-02 m3
3 SR-D6-03 m3
1.3.6 Dusun VII Suka Ramai
1. SR-D7-01 m3
2. SR-D7-02 m3
3 SR-D7-03 m3
4. SR-D7-04 m3
5. SR-D7-05 m3
6. SR-D7-06 m3
7. SR-D7-07 m3
8. SR-D7-08 m3
1.3.7 Desa Tanjung Harapan
1. TH-D0-01 m3
2. TH-D0-02 m3
1.3.8 Desa Aras
1. AR-D0-01 m3
2. AR-D0-02 m3
3 AR-D0-03 m3
4. AR-D0-04 m3
1.3.9 Desa Pematang Kuing
1. PK-D0-01 m3
1.3.10 Desa Gambus Laut
1. GB-D0-01 m3
2. GB-D0-02 m3
3 GB-D0-03 m3
4. GB-D0-04 m3
5. GB-D0-05 m3
6. GB-D0-06 m3
7. GB-D0-07 m3
8. GB-D0-08 m3
9. GB-D0-09 m3
10. GB-D0-10 m3
11. GB-D0-11 m3
II Demolishes of House and Public Facilities
2.1 Demolishing
- Concrete m3
- Brick Wall m2
- Wood m3
- Steel kg
- River stone m3
- Seng/alumunium m2
- Glass m3
2.2 Disposal of Material Demolish
- Concrete m3
- Brick Wall m2
- Wood m3
- Steel kg
- River stone m3
- Seng/alumunium m2
- Glass m3
III Closure and Relocation of Tributaries
3.1 Closure of Tributaries
3.1.1 Cutting and Disposal
- Sungai Tanjung m3
- Sungai Dua m3
- Drainase Belanda m3
- Parit 3 m3
- Anak Sungai Gambus m3
- Sungai Titik Payung m3
- Sungai Pandan m3
- Sungai Tampus m3
- Anak Sungai Dalu-dalu m3
3.1.2 Cut, Filling and Compaction (from Quary)
- Sungai Tanjung m3
- Sungai Dua m3
- Drainase Belanda m3
- Parit 3 m3
- Anak Sungai Gambus m3
- Sungai Titik Payung m3
- Sungai Pandan m3
- Sungai Tampus m3
- Anak Sungai Dalu-dalu m3
3.2 Relocation Tributaries
3.2.1 Cutting and Disposal
- Sungai Tanjung m3
- Sungai Dua m3
- Drainase Belanda m3
- Parit 3 m3
- Anak Sungai Gambus m3
- Sungai Titik Payung m3
- Sungai Pandan m3
- Sungai Tampus m3
- Anak Sungai Dalu-dalu m3
3.2.2 Cut, Filling and Compaction (from Quary)
- Sungai Tanjung m3
- Sungai Dua m3
- Drainase Belanda m3
- Parit 3 m3
- Anak Sungai Gambus m3
- Sungai Titik Payung m3
- Sungai Pandan m3
- Sungai Tampus m3
- Anak Sungai Dalu-dalu m3
3.2.3 Cofferdam and Dewatering
- Sungai Tanjung Ls
- Sungai Dua Ls
- Drainase Belanda Ls
- Parit 3 Ls
- Anak Sungai Gambus Ls
- Sungai Titik Payung Ls
- Sungai Pandan Ls
- Sungai Tampus Ls
- Anak Sungai Dalu-dalu Ls
IV Relocation Water Intake PT Inalum
1 Installation of New Line (Pipe) m'
2 Construction of New Water Intake Ls
3 Demolishing of Pipe and Wtaer Inatkae Facilities Ls
V Relocation SUTT/Distribution of PLN
1 Relocation of SUTT Ls
2 Demolish eksisting distribution Ls
VI Demolish and Relocation of Road and Drainage
1 Demolished of Existing Road
- Regency Road m'
- Province Road m'
2 Relocation of Road (New Construction) and Bridge
- Alternative Road m'
- New Bridge L = 120 m (Sungai Dalu-dalu) Unit
- New Bridge L = 30 m (Sungai Gambus 1) Unit
- New Bridge L = 20 m (Sungai Gambus 2) Unit
VII Demolish and Relocation of Cemetery
Dusun I Kuala Indah -1 m2
Dusun I Kuala Indah -2 m2
Dusun IV Kuala Indah m2
Desa Suka Ramai m2
Desa Tanjung Harapan m2
Desa Gambus Laut m2
VIII Temporary Road
1 New Construction m'
2 Improvement existing Road (Benteng/tanggul) m'
IX Temporary Drainage
1 Normalisation of Eksisting Drainage/Tributeries m'
2 Construction Drainage System (Polder, retarding basin) Ls
X Facilities Support
1 Constrcution of Fence m'
2 Constrcution of Guard Post Unit
XI Slope Stabilisation / Lereng
1 Retaining Wall m3
2 Stone Masonry m3
3 Embankment m3
GRR LOCATION PLAN FOR KUALA TANJUNG BATU BARA REGENCY - SUMATERA
UTRA PROVINCE
4,742.8
13,963.6
11,593.6
23,885.9
22,402.6
14,974.6
27,855.1
29,360.8
10,602.1
24,776.2
i tambahan di stripping)
4,742.8
13,963.6
11,593.6
23,885.9
22,402.6
14,974.6
27,855.1
29,360.8
10,602.1
24,776.2
-
245,887.4 0.010 2 83.818 2.794 0.230
688,990.1 0.010 5 93.945 3.132 0.257
-
173,432.2 0.010 1 118.239 3.941 0.324
179,680.3 0.010 2 61.249 2.042 0.168
60,853.0 0.010 1 41.487 1.383 0.114
201,765.5 0.010 2 68.778 2.293 0.188
352,565.3 0.010 3 80.122 2.671 0.220
-
610,411.6 0.010 5 83.231 2.774 0.228
318,544.9 0.010 3 72.390 2.413 0.198
157,373.6 0.010 3 35.764 1.192 0.098
-
731,436.1 0.010 5 99.733 3.324 0.273
38,418.3 0.010 1 26.192 0.873 0.072
24,948.0 0.010 1 17.009 0.567 0.047
86,376.3 0.010 1 58.888 1.963 0.161
200,685.0 0.010 2 68.409 2.280 0.187
308,629.2 0.010 3 70.137 2.338 0.192
741,859.7 0.010 5 101.154 3.372 0.277
302,608.7 0.010 3 68.769 2.292 0.188
236,062.6 0.010 2 80.469 2.682 0.220
136,584.4 0.010 2 46.559 1.552 0.128
40,584.0 0.010 1 27.669 0.922 0.076
42,316.5 0.010 1 28.850 0.962 0.079
79,927.0 0.010 1 54.491 1.816 0.149
189,130.5 0.010 2 64.471 2.149 0.177
585,470.3 0.010 5 79.830 2.661 0.219
153,754.5 0.010 2 52.412 1.747 0.144
-
850,583.8 0.010 5 115.979 3.866 0.318
361,327.8 0.010 3 82.113 2.737 0.225
528,685.7 0.010 4 90.109 3.004 0.247
-
25,002.5 0.010 1 17.046 0.568 0.047
81,378.3 0.010 1 55.480 1.849 0.152
58,544.4 0.010 1 39.913 1.330 0.109
92,000.8 0.010 1 62.722 2.091 0.172
67,447.3 0.010 1 45.983 1.533 0.126
69,196.5 0.010 1 47.175 1.573 0.129
153,551.3 0.010 1 104.685 3.490 0.287
61,065.8 0.010 1 41.632 1.388 0.114
-
2,104,158.6 0.010 12 119.544 3.985 0.328
1,343,612.4 0.010 10 91.602 3.053 0.251
-
178,259.0 0.010 2 60.765 2.025 0.166
602,974.9 0.010 4 102.771 3.426 0.282
186,826.7 0.010 2 63.685 2.123 0.174
530,339.5 0.010 4 90.391 3.013 0.248
-
910,407.4 0.010 7 88.668 2.956 0.243
-
196,166.4 0.010 2 66.869 2.229 0.183
26,103.4 0.010 1 17.796 0.593 0.049
152,952.9 0.010 1 104.277 3.476 0.286
79,833.1 0.010 1 54.427 1.814 0.149
28,079.5 0.010 1 19.143 0.638 0.052
31,130.6 0.010 1 21.224 0.707 0.058
58,818.6 0.010 1 40.100 1.337 0.110
18,131.9 0.010 1 12.362 0.412 0.034
8,226.7 0.010 1 5.609 0.187 0.015
10,777.9 0.010 1 7.348 0.245 0.020
8,725.4 0.010 1 5.949 0.198 0.016
32,455.7
283,484.6
9,649.9
1,312,188.7
34,162.0
238,879.9
147.8
32,455.7
283,484.6
9,649.9
1,312,188.7
34,162.0
238,879.9
147.8
23,147.6
16,752.7
10,865.5
20,322.2
1,770.6
4,255.4
7,311.0
17,087.9
41,849.8
98,814.9
60,158.6
43,056.3
77,802.2
8,996.4
49,323.9
8,519.1
87,016.0
191,756.0
3,089.8
4,920.1
9,405.4
756.6
2,690.9
2,593.8
1,060.1
933.5
1,471.8
42,385.0
28.0