PROGRAM : PAMSIMAS 2
PEKERJAAN : SARANA AIR MINUM DAN SANITASI
LOKASI : DESA ARAJANG / KEC. GILIRENG
TAHUN ANGGARAN : 2013
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.100 50,000.00 5,000.00
2. Tukang Kayu Hari/Orang - -
3. Kepala Tukang Hari/Orang - -
4. Mandor Hari/Orang 0.050 -
JUMLAH 5,000.00
JUMLAH 5,000.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.100 50,000.00 5,000.00
2. Tukang Kayu Hari/Orang 0.100 -
3. Kepala Tukang Hari/Orang 0.010 -
4. Mandor Hari/Orang 0.005 -
JUMLAH 5,000.00
B. BAHAN
1. Kayu Klas III uk. 5/7 M3 0.012 1,350,000.00 16,200.00
2. Paku biasa 2" - 5" Kg 0.020 15,000.00 300.00
3. Kayu papan 3/20 M3 0.007 1,350,000.00 9,450.00
JUMLAH 25,950.00
JUMLAH A + B 30,950.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.526 50,000.00 26,300.00
2. Tukang Gali Hari/Orang - - -
3. Kepala Tukang Hari/Orang - - -
4. Mandor Hari/Orang 0.052 - -
JUMLAH A 26,300.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.735 50,000.00 36,750.00
2. Tukang Gali Hari/Orang - - -
3. Kepala Tukang Hari/Orang - - -
4. Mandor Hari/Orang 0.073 - -
JUMLAH A 36,750.00
3. 1 m3 Galian tanah biasa max. sedalam 1 meter
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KOEFISIEN
( Rp ) ( Rp )
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.400 50,000.00 20,000.00
2. Tukang Gali Hari/Orang - -
3. Kepala Tukang Hari/Orang - -
4. Mandor Hari/Orang 0.040 -
JUMLAH A 20,000.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.625 50,000.00 31,250.00
2. Tukang Gali Hari/Orang - - -
3. Kepala Tukang Hari/Orang - -
4. Mandor Hari/Orang 0.062 -
JUMLAH A 31,250.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 1.250 50,000.00 62,500.00
2. Tukang Gali Hari/Orang - - -
3. Kepala Tukang Hari/Orang - - -
4. Mandor Hari/Orang 0.125 - -
JUMLAH A 62,500.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.823 50,000.00 41,150.00
2. Tukang Gali Hari/Orang - - -
3. Kepala Tukang Hari/Orang - -
4. Mandor Hari/Orang 0.083 -
JUMLAH A 41,150.00
5. 1 m3 Urugan kembali
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.192 50,000.00 9,600.00
2. Tukang Gali Hari/Orang - - -
3. Kepala Tukang Hari/Orang - -
4. Mandor Hari/Orang 0.019 -
JUMLAH A 9,600.00
6. 1 m3 Pemadatan tanah
SATUAN HARGA SATUAN BIAYA SATUAN
NO. URAIAN KUANTITAS
( Rp ) ( Rp )
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.500 50,000.00 25,000.00
2. Tukang Gali Hari/Orang - - -
3. Kepala Tukang Hari/Orang - -
4. Mandor Hari/Orang 0.050 -
JUMLAH A 25,000.00
7. 1 m3 Urugan pasir
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.300 50,000.00 15,000.00
2. Tukang Gali Hari/Orang - - -
3. Kepala Tukang Hari/Orang - -
4. Mandor Hari/Orang 0.010 -
JUMLAH A 15,000.00
B. BAHAN
1. Pasir urug M3 1.200 100,000.00 120,000.00
JUMLAH 120,000.00
JUMLAH A + B 135,000.00
8. 1 m3 Urugan kerikil
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.250 50,000.00 12,500.00
2. Tukang Gali Hari/Orang - - -
3. Kepala Tukang Hari/Orang - -
4. Mandor Hari/Orang 0.025 -
JUMLAH A 12,500.00
B. BAHAN
1. Kerikil M3 1.200 137,500.00 165,000.00
JUMLAH 165,000.00
JUMLAH A + B 177,500.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.150 50,000.00 7,500.00
2. Tukang Gali Hari/Orang - - -
3. Kepala Tukang Hari/Orang - -
4. Mandor Hari/Orang 0.015 -
JUMLAH A 7,500.00
B. BAHAN
1. Ijuk m3 1.200 20,000.00 24,000.00
JUMLAH 24,000.00
JUMLAH A + B 31,500.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 1.500 50,000.00 75,000.00
2. Tukang Batu Hari/Orang 0.600 75,000.00 45,000.00
3. Kepala Tukang Hari/Orang 0.060 -
4. Mandor Hari/Orang 0.075 -
JUMLAH 120,000.00
B. BAHAN
1. Batu belah 10/15 cm M3 1.100 137,500.00 151,250.00
2. Semen Portland Kg 202.000 1,200.00 242,400.00
3. Pasir pasang M3 0.485 125,000.00 60,625.00
JUMLAH 454,275.00
JUMLAH A + B 574,275.00
10. 1 m3 Pasang pondasi batu kali, 1 Pc : 4 Ps
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )
A. TENAGA KERJA
1. Pekerja Hari/Orang 1.500 50,000.00 75,000.00
2. Tukang Batu Hari/Orang 0.600 75,000.00 45,000.00
3. Kepala Tukang Hari/Orang 0.060 -
4. Mandor Hari/Orang 0.075 -
JUMLAH 120,000.00
B. BAHAN
1. Batu belah 10/15 cm M3 1.100 137,500.00 151,250.00
2. Semen Portland Kg 163.000 1,200.00 195,600.00
3. Pasir pasang M3 0.520 125,000.00 65,000.00
JUMLAH 411,850.00
JUMLAH A + B 531,850.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.780 50,000.00 39,000.00
2. Tukang Batu Hari/Orang 0.390 75,000.00 29,250.00
3. Kepala Tukang Hari/Orang 0.039 -
4. Mandor Hari/Orang 0.039 -
JUMLAH 68,250.00
B. BAHAN
1. Batu belah 10/15 cm M3 1.200 137,500.00 165,000.00
2. Pasir urug M3 0.300 100,000.00 30,000.00
JUMLAH 195,000.00
JUMLAH A + B 263,250.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 1.650 50,000.00 82,500.00
2. Tukang Batu Hari/Orang 0.250 75,000.00 18,750.00
3. Kepala Tukang Hari/Orang 0.025 -
4. Mandor Hari/Orang 0.080 -
JUMLAH 101,250.00
B. BAHAN
1. Semen Portland Kg 218.000 1,200.00 261,600.00
2. Pasir beton M3 0.520 125,000.00 65,000.00
3. Koral beton M3 0.870 325,000.00 282,750.00
JUMLAH 609,350.00
JUMLAH A + B 710,600.00
13. 1 m2 Membuat lantai kerja beton tumbuk, 1 Pc : 3 Ps : 5 Kr, tebal 5 cm
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )
A. TENAGA KERJA
1. Pekerja Hari/Orang 1.150 50,000.00 57,500.00
2. Tukang Batu Hari/Orang 0.020 75,000.00 1,500.00
3. Kepala Tukang Hari/Orang 0.002 -
4. Mandor Hari/Orang 0.006 -
JUMLAH 59,000.00
B. BAHAN
1. Semen Portland Kg 10.000 1,200.00 12,000.00
2. Pasir beton M3 0.026 125,000.00 3,250.00
3. Koral beton M3 0.044 325,000.00 14,300.00
JUMLAH 29,550.00
JUMLAH A + B 88,550.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 1.650 50,000.00 82,500.00
2. Tukang Batu Hari/Orang 0.250 75,000.00 18,750.00
3. Kepala Tukang Hari/Orang 0.025 -
4. Mandor Hari/Orang 0.080 -
JUMLAH 101,250.00
B. BAHAN
1. Semen Portland Kg 232.000 1,200.00 278,400.00
2. Pasir beton M3 0.520 125,000.00 65,000.00
3. Koral beton M3 0.780 325,000.00 253,500.00
JUMLAH 596,900.00
JUMLAH A + B 698,150.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.007 50,000.00 350.00
2. Tukang Besi Hari/Orang 0.007 75,000.00 525.00
3. Kepala Tukang Hari/Orang 0.0007 -
4. Mandor Hari/Orang 0.0003 -
JUMLAH 875.00
B. BAHAN
1. Besi beton polos Kg 1.050 9,000.00 9,450.00
2. Kawat beton Kg 0.015 18,000.00 270.00
JUMLAH 9,720.00
JUMLAH A + B 10,595.00
B. BAHAN
1. Kayu terentang M3 0.040 1,350,000.00 54,000.00
2. Paku biasa 2" - 5' Kg 0.300 15,000.00 4,500.00
3. Minyak bekisting Ltr 0.100 - -
JUMLAH 58,500.00
JUMLAH A + B 93,000.00
17. 1 m2 Pasang bekisting untuk sloof
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.300 50,000.00 15,000.00
2. Tukang Kayu Hari/Orang 0.260 75,000.00 19,500.00
3. Kepala Tukang Hari/Orang 0.026 - -
4. Mandor Hari/Orang 0.005 -
JUMLAH 34,500.00
B. BAHAN
1. Kayu terentang M3 0.045 1,350,000.00 60,750.00
2. Paku biasa 2" - 5' Kg 0.300 15,000.00 4,500.00
3. Minyak bekisting Ltr 0.100 - -
JUMLAH 65,250.00
JUMLAH A + B 99,750.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.300 50,000.00 15,000.00
2. Tukang Kayu Hari/Orang 0.330 75,000.00 24,750.00
3. Kepala Tukang Hari/Orang 0.033 - -
4. Mandor Hari/Orang 0.006 - -
JUMLAH 39,750.00
B. BAHAN
1. Kayu Papan Kls III M3 0.040 1,350,000.00 54,000.00
2. Paku biasa 2" - 5' Kg 0.400 15,000.00 6,000.00
3. Minyak bekisting Ltr 0.200 - -
4. Balok kayu Kls. III M3 0.015 1,350,000.00 20,250.00
5. Plywood tebal 9 mm Lmbr 0.350 45,000.00 15,750.00
6. Bambu Btg 2.000 7,000.00 14,000.00
JUMLAH 110,000.00
JUMLAH A + B 149,750.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.320 50,000.00 16,000.00
2. Tukang Kayu Hari/Orang 0.330 75,000.00 24,750.00
3. Kepala Tukang Hari/Orang 0.033 - -
4. Mandor Hari/Orang 0.006 - -
JUMLAH 40,750.00
B. BAHAN
1. Kayu terentang M3 0.040 1,350,000.00 54,000.00
2. Paku biasa 2" - 5' Kg 0.400 15,000.00 6,000.00
3. Minyak bekisting Ltr 0.200 - -
4. Balok kayu borneo M3 0.018 1,350,000.00 24,300.00
5. Plywood tebal 9 mm Lmbr 0.350 45,000.00 15,750.00
6. Dolken kayu galam Æ 8 - 10/ 4 m Btg 2.000 7,000.00 14,000.00
JUMLAH 114,050.00
JUMLAH A + B 154,800.00
20. 1 m2 Pasang bekisting untuk lantai
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.320 50,000.00 16,000.00
2. Tukang Batu Hari/Orang 0.330 75,000.00 24,750.00
3. Kepala Tukang Hari/Orang 0.033 -
4. Mandor Hari/Orang 0.006 -
JUMLAH 40,750.00
B. BAHAN
1. Kayu terentang M3 0.040 1,350,000.00 54,000.00
2. Paku biasa 2" - 5' Kg 0.400 15,000.00 6,000.00
3. Minyak bekisting Ltr 0.200 - -
4. Balok kayu borneo M3 0.015 1,350,000.00 20,250.00
5. Plywood tebal 9 mm Lmbr 0.350 45,000.00 15,750.00
6. Dolken kayu galam Æ 8 - 10/ 4 m Btg 6.000 7,000.00 -
JUMLAH 96,000.00
JUMLAH A + B 136,750.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.320 50,000.00 16,000.00
2. Tukang Kayu Hari/Orang 0.330 75,000.00 24,750.00
3. Kepala Tukang Hari/Orang 0.033 -
4. Mandor Hari/Orang 0.006 -
JUMLAH 40,750.00
B. BAHAN
1. Kayu terentang M3 0.030 1,350,000.00 40,500.00
2. Paku biasa 2" - 5' Kg 0.400 15,000.00 6,000.00
3. Minyak bekisting Ltr 0.200 - -
4. Balok kayu borneo M3 0.020 1,350,000.00 27,000.00
5. Plywood tebal 9 mm Lmbr 0.350 45,000.00 15,750.00
6. Dolken kayu galam Æ 8 - 10/ 4 m Btg 3.000 7,000.00 21,000.00
7. Formtie/penjaga jrk bekisting/spacer Buah 4.000 - -
JUMLAH 110,250.00
JUMLAH A + B 151,000.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.320 50,000.00 16,000.00
2. Tukang Batu Hari/Orang 0.100 75,000.00 7,500.00
3. Kepala Tukang Hari/Orang 0.010 -
4. Mandor Hari/Orang 0.015 -
JUMLAH 23,500.00
B. BAHAN
1. Bata merah 5 x 11 x 22 cm Bh 70.000 550.00 38,500.00
2. Semen Portland Kg 18.950 1,200.00 22,740.00
3. Pasir pasang M3 0.038 125,000.00 4,750.00
JUMLAH 65,990.00
JUMLAH A + B 89,490.00
22. 1 m2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Ps
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.320 50,000.00 16,000.00
2. Tukang Batu Hari/Orang 0.100 75,000.00 7,500.00
3. Kepala Tukang Hari/Orang 0.010 -
4. Mandor Hari/Orang 0.015 -
JUMLAH 23,500.00
B. BAHAN
1. Bata merah 5 x 11 x 22 cm Bh 70.000 550.00 38,500.00
2. Semen Portland Kg 14.370 1,200.00 17,244.00
3. Pasir pasang M3 0.040 125,000.00 5,000.00
JUMLAH 60,744.00
JUMLAH A + B 84,244.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.320 50,000.00 16,000.00
2. Tukang Batu Hari/Orang 0.100 75,000.00 7,500.00
3. Kepala Tukang Hari/Orang 0.010 -
4. Mandor Hari/Orang 0.015 -
JUMLAH 23,500.00
B. BAHAN
1. Bata merah 5 x 11 x 22 cm Bh 70.000 550.00 38,500.00
2. Semen Portland Kg 11.500 1,200.00 13,800.00
3. Pasir pasang M3 0.043 125,000.00 5,375.00
JUMLAH 57,675.00
JUMLAH A + B 81,175.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.0083 50,000.00 415.00
2. Tukang Batu Hari/Orang 0.0027 75,000.00 202.50
3. Kepala Tukang Hari/Orang 0.00027 - -
4. Mandor Hari/Orang 0.00042 - -
JUMLAH 617.50
B. BAHAN
1. Roaster / terawang Bh 1.000 25,500.00 25,500.00
2. Semen Portland Kg 0.337 1,200.00 404.16
3. Pasir pasang M3 0.00097 125,000.00 121.25
JUMLAH 26,025.41
JUMLAH A + B 26,642.91
B. BAHAN
1. Semen Portland Kg 14.280 1,200.00 17,136.00
2. Pasir pasang M3 0.023 125,000.00 2,875.00
JUMLAH 20,011.00
JUMLAH A + B 47,511.00
26. 1 m2 Plesteran 1 Pc : 4 Ps, tebal 20 mm
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.250 50,000.00 12,500.00
2. Tukang Batu Hari/Orang 0.200 75,000.00 15,000.00
3. Kepala Tukang Hari/Orang 0.020 -
4. Mandor Hari/Orang 0.0125 -
JUMLAH 27,500.00
B. BAHAN
1. Semen Portland Kg 8.680 1,200.00 10,416.00
2. Pasir pasang M3 0.028 125,000.00 3,500.00
JUMLAH 13,916.00
JUMLAH A + B 41,416.00
A. TENAGA KERJA
Pekerja Hari/Orang 0.085 50,000.00 4,250.00
Tukang Batu Hari/Orang 0.05 75,000.00 3,750.00
Kepala Tukang Batu Hari/Orang 0.05
Mandor Hari/Orang 0.043
JUMLAH 8,000.00
B. BAHAN
Semen Portland Kg 5.927 1,200.00 7,112.40
JUMLAH 7,112.40
JUMLAH A + B 15,112.40
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.620 50,000.00 31,000.00
2. Tukang Batu Hari/Orang 0.350 75,000.00 26,250.00
3. Kepala Tukang Hari/Orang 0.035 -
4. Mandor Hari/Orang 0.030 -
JUMLAH 57,250.00
B. BAHAN
1. Ubin keramik 20 x 20 cm M² 1.000 45,000.00 45,000.00
2. Semen Portland Kg 11.380 1,200.00 13,656.00
3. Pasir pasang M3 0.042 125,000.00 5,250.00
4. Semen warna Kg 1.500 15,000.00 22,500.00
JUMLAH 86,406.00
JUMLAH A + B 143,656.00
B. BAHAN
1. Kayu balok kelas II M3 1.200 4,500,000.00 5,400,000.00
JUMLAH 5,400,000.00
JUMLAH A + B 7,050,000.00
30. 1 m2 Pasang Pintu Panel kelas II
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )
A. TENAGA KERJA
1. Pekerja Hari/Orang 1.000 50,000.00 50,000.00
2. Tukang Kayu Hari/Orang 2.500 75,000.00 187,500.00
3. Kepala Tukang Hari/Orang 0.250 -
4. Mandor Hari/Orang 0.050 -
JUMLAH 237,500.00
B. BAHAN
1. Kayu papan kelas II M3 0.040 4,500,000.00 180,000.00
JUMLAH 180,000.00
JUMLAH A + B 417,500.00
A. TENAGA KERJA
1. Tukang Hari/Orang 1.050 50,000.00 52,500.00
2. Pekerja Hari/Orang 1.050 75,000.00 78,750.00
3. Kepala Tukang Hari/Orang 0.105 -
4. Mandor Hari/Orang 0.0052 -
JUMLAH 131,250.00
B. BAHAN
1. Pintu Fiber M2 1.000 220,000.00 220,000.00
JUMLAH 220,000.00
JUMLAH A + B 351,250.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 4.000 50,000.00 200,000.00
2. Tukang Kayu Hari/Orang 12.000 75,000.00 900,000.00
3. Kepala Tukang Hari/Orang 1.200 -
4. Mandor Hari/Orang 0.200 -
JUMLAH 1,100,000.00
B. BAHAN
1. Kayu balok kelas II M3 1.100 4,500,000.00 4,950,000.00
2. Besi strip Kg 15.000 25,000.00 375,000.00
3. Paku biasa 2" - 5" Kg 0.800 15,000.00 12,000.00
JUMLAH 5,337,000.00
JUMLAH A + B 6,437,000.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 2.000 50,000.00 100,000.00
2. Tukang Kayu Hari/Orang 6.000 75,000.00 450,000.00
3. Kepala Tukang Hari/Orang 0.600 -
4. Mandor Hari/Orang 0.100 -
JUMLAH 550,000.00
B. BAHAN
1. Kayu balok kelas II M3 1.100 4,500,000.00 4,950,000.00
2. Paku biasa 2" - 5" Kg 1.300 15,000.00 19,500.00
JUMLAH 4,969,500.00
JUMLAH A + B 5,519,500.00
34. 1 m2 Pasang atap seng gelombang
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.120 50,000.00 6,000.00
2. Tukang Kayu Hari/Orang 0.060 75,000.00 4,500.00
3. Kepala Tukang Hari/Orang 0.006 -
4. Mandor Hari/Orang 0.006 -
JUMLAH 10,500.00
B. BAHAN
1. Seng gelombang 3' x 6' bjls 28 Lmbr 0.700 40,600.00 28,420.00
2. Paku biasa /2" - 1"
1
Kg 0.020 15,000.00 300.00
JUMLAH 28,720.00
JUMLAH A + B 39,220.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.250 50,000.00 12,500.00
2. Tukang Kayu Hari/Orang 0.350 75,000.00 26,250.00
3. Kepala Tukang Hari/Orang 0.035 -
4. Mandor Hari/Orang 0.0125 -
JUMLAH 38,750.00
B. BAHAN
1. Kayu balok kelas II M3 0.027 4,500,000.00 121,500.00
2. Paku biasa 2" - 5" Kg 0.200 15,000.00 3,000.00
JUMLAH 124,500.00
JUMLAH A + B 163,250.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.070 50,000.00 3,500.00
2. Tukang Kayu Hari/Orang 0.100 75,000.00 7,500.00
3. Kepala Tukang Hari/Orang 0.010 -
4. Mandor Hari/Orang 0.0035 -
JUMLAH 11,000.00
B. BAHAN
1. Teakwood 4' x 8' x 4 mm Lmbr 0.360 48,000.00 -
2. Paku Kg 0.030 17,000.00 -
JUMLAH -
JUMLAH A + B 11,000.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.100 50,000.00 5,000.00
2. Tukang Kayu Hari/Orang 0.200 75,000.00 15,000.00
3. Kepala Tukang Hari/Orang 0.025 -
4. Mandor Hari/Orang 0.005 -
JUMLAH 20,000.00
B. BAHAN
1. Kayu papan kelas II M3 0.0072 3,858,000.00 27,777.60
2. Paku biasa 2" - 5" Kg 0.050 17,000.00 850.00
JUMLAH 28,627.60
JUMLAH A + B 48,627.60
38. 1 m2 pengecatan tembok baru ( 1 lapis cat dasar, 2 lapis cat penutup )
NO. HARGA SATUAN BIAYA SATUAN
URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.028 50,000.00 1,400.00
2. Tukang Cat Hari/Orang 0.042 75,000.00 3,150.00
3. Kepala Tukang Hari/Orang 0.0042 -
4. Mandor Hari/Orang 0.0025 -
JUMLAH 4,550.00
B. BAHAN
1. Cat dasar Kg 0.120 85,000.00 10,200.00
2. Cat penutup 2 kali Kg 0.180 85,000.00 15,300.00
JUMLAH 25,500.00
JUMLAH A + B 30,050.00
39. 1 m2 pengecatan tembok baru ( 1 lapis plamur ), 1 lapis cat dasar, 2 lapis cat penutup
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.020 50,000 1,000
2. Tukang Cat Hari/Orang 0.063 75,000 4,725
3. Kepala Tukang Hari/Orang 0.0063 -
4. Mandor Hari/Orang 0.0025 -
JUMLAH 5,725
B. BAHAN
1. Plamur Kg 0.100 60,000 6,000
2. Cat dasar Kg 0.100 85,000 8,500
3. Cat penutup 2 kali Kg 0.260 85,000 22,100
JUMLAH 36,600
JUMLAH A + B 42,325
39. 1 m2 pengecatan bidang kayu baru ( 1 lapis plamur ), 1 lapis cat dasar, 2 lapis cat penutup
NO. HARGA SATUAN BIAYA SATUAN
URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.070 50,000.00 3,500.00
2. Tukang Cat Hari/Orang 0.009 75,000.00 675.00
3. Kepala Tukang Hari/Orang 0.006 - -
4. Mandor Hari/Orang 0.0025 -
JUMLAH 4,175.00
B. BAHAN
1. Cat meni Kg 0.200 65,000.00 13,000.00
2. Plamur Kg 0.150 60,000.00 9,000.00
3. Cat dasar Kg 0.170 45,000.00 7,650.00
4. Cat penutup 2 kali Kg 0.260 45,000.00 11,700.00
JUMLAH 11,700.00
JUMLAH A + B 15,875.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 1.200 50,000.00 60,000.00
2. Tukang Las Hari/Orang 1.200 75,000.00 90,000.00
3. Kepala Tukang Hari/Orang 0.012 -
4. Mandor Hari/Orang 0.0006 -
JUMLAH 150,000.00
B. BAHAN
1. Besi plat M² 0.416 700,000.00 291,480.00
2. Besi siku 40.40.4 M' 8.000 54,000.00 432,000.00
JUMLAH 723,480.00
JUMLAH A + B 873,480.00
41. 1 m2 pasang tangga monyet
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )
A. TENAGA KERJA
1. Tukang Las Hari/Orang 1.200 50,000.00 60,000.00
2. Pekerja Hari/Orang 1.200 75,000.00 90,000.00
3. Kepala Tukang Hari/Orang 0.012 -
4. Mandor Hari/Orang 0.0006 -
JUMLAH 150,000.00
B. BAHAN
1. Pipa gip 1" M' 4.000 39,167 156,666.67
JUMLAH 156,666.67
JUMLAH A + B 306,666.67
42. 1 bh engsel
NO. HARGA SATUAN BIAYA SATUAN
URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.015 50,000.00 750.00
2. Tukang Kayu Hari/Orang 0.150 75,000.00 11,250.00
3. Kepala Tukang Hari/Orang 0.015 -
4. Mandor Hari/Orang 0.00075 -
JUMLAH 12,000.00
B. BAHAN
1. Engsel pintu Buah 1.000 25,000.00 25,000.00
JUMLAH 25,000.00
JUMLAH A + B 37,000.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.020 50,000.00 1,000.00
2. Tukang Kayu Hari/Orang 0.200 75,000.00 15,000.00
3. Kepala Tukang Hari/Orang 0.020 -
4. Mandor Hari/Orang 0.00100 -
JUMLAH 16,000.00
B. BAHAN
1. Kunci Pintu Buah 1.000 25,000.00 25,000.00
JUMLAH 25,000.00
JUMLAH A + B 41,000.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 1.000 50,000.00 50,000.00
2. Tukang Batu Hari/Orang 1.500 75,000.00 112,500.00
3. Kepala Tukang Hari/Orang 0.300 -
4. Mandor Hari/Orang 0.110 -
JUMLAH 162,500.00
B. BAHAN
1. Kloset jongkok teraso Buah 1.000 300,000.00 300,000.00
2. Bata merah 5 x 11 x 22 cm Buah 7.000 550.00 3,850.00
3. Sement portland Kg 6.000 1,200.00 7,200.00
4. Pasir pasang M3 0.010 125,000.00 1,250.00
JUMLAH 312,300.00
JUMLAH A + B 474,800.00
45. Memasang 1 m buah bak kontrol pasangan batu batu ukuran ( 30 x 30 ) cm, tinggi 35 cm
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )
A. TENAGA KERJA
1. Pekerja Hari/Orang 3.200 50,000.00 160,000.00
2. Tukang Batu Hari/Orang 1.015 75,000.00 76,125.00
3. Kepala Tukang Hari/Orang 0.0015 -
4. Mandor Hari/Orang 0.016 -
JUMLAH 236,125.00
B. BAHAN
1. Batu bata M3 0.145 550.00 79.75
2. Sement portland Kg 44.000 1,200.00 52,800.00
3. Pasir pasang M3 0.070 125,000.00 8,750.00
4. Batu kerikil M3 0.070 325,000.00 22,750.00
5. Besi beton Kg 1.600 9,000.00 14,400.00
6. Pasir beton M3 0.060 125,000.00 7,500.00
JUMLAH 106,279.75
JUMLAH A + B 342,404.75
46. Memasang 1 m buah bak kontrol pasangan batu batu ukuran ( 45 x 45 ) cm, tinggi 50 cm
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )
A. TENAGA KERJA
1. Pekerja Hari/Orang 1.42 50,000.00 71,000.00
2. Tukang Batu Hari/Orang 0.473 75,000.00 35,475.00
3. Kepala Tukang Hari/Orang 0.47 -
4. Mandor Hari/Orang 0.071 -
JUMLAH 106,475.00
B. BAHAN
1. Batu bata M3 0.25 550.00 137.50
2. Sement portland Kg 77 1,200.00 92,400.00
3. Pasir pasang M3 0.13 125,000.00 16,250.00
4. Batu kerikil M3 0.02 300,000.00 6,000.00
5. Besi beton Kg 2.6 9,000.00 23,400.00
6. Pasir beton M3 0.09 125,000.00 11,250.00
JUMLAH 149,437.50
JUMLAH A + B 255,912.50
47. Memasang 1 m buah bak kontrol pasangan batu bata ukuran ( 60 x 60 ) cm, tinggi 65 cm
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )
A. TENAGA KERJA
1. Pekerja Hari/Orang 2.160 50,000.00 108,000.00
2. Tukang Batu Hari/Orang 0.720 75,000.00 54,000.00
3. Kepala Tukang Hari/Orang 0.072 -
4. Mandor Hari/Orang 0.108 -
5. Tukang Gali Hari/Orang 0.100 -
JUMLAH 162,000.00
B. BAHAN
1. Batu bata M3 0.371 550.00 204.05
2. Sement portland Kg 114.000 1,200.00 136,800.00
3. Pasir pasang M3 0.184 125,000.00 23,000.00
4. Batu koral M3 0.033 300,000.00 9,900.00
5. Besi beton Kg 4.850 9,000.00 43,650.00
6. Pasir beton M3 0.120 125,000.00 15,000.00
JUMLAH 228,554.05
JUMLAH A + B 390,554.05
48. Memasang 1 m' Pipa PVC tipe AW diameter 1/2"
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.036 50,000.00 1,800.00
2. Tukang Batu Hari/Orang 0.060 75,000.00 4,500.00
3. Kepala Tukang Hari/Orang 0.006 -
4. Mandor Hari/Orang 0.0018 -
JUMLAH 6,300.00
B. BAHAN
1. Pipa PVC M' 1.200 1,833.33 2,200.00
2. Perlengkapan 35 % harga pipa Ls 0.35 - -
JUMLAH 2,200.00
JUMLAH A + B 8,500.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.036 50,000.00 1,800.00
2. Tukang Hari/Orang 0.060 75,000.00 4,500.00
3. Kepala Tukang Hari/Orang 0.006 -
4. Mandor Hari/Orang 0.0018 -
JUMLAH 6,300.00
B. BAHAN
1. Pipa PVC M' 1.200 2,700.00 3,240.00
2. Perlengkapan 35 % harga pipa Ls 0.35 - -
JUMLAH 3,240.00
JUMLAH A + B 9,540.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.036 50,000.00 1,800.00
2. Tukang Batu Hari/Orang 0.060 75,000.00 4,500.00
3. Kepala Tukang Hari/Orang 0.006 -
4. Mandor Hari/Orang 0.0018 -
JUMLAH 6,300.00
B. BAHAN
1. Pipa PVC M' 1.200 4,566.67 5,480.00
2. Perlengkapan 35 % harga pipa Ls 0.350 - -
JUMLAH 5,480.00
JUMLAH A + B 11,780.00
B. BAHAN
1. Pipa PVC M' 1.200 6,700.00 8,040.00
2. Perlengkapan 35 % harga pipa Ls 0.350 - -
JUMLAH 8,040.00
JUMLAH A + B 14,340.00
52. Memasang 1 m' Pipa PVC tipe AW diameter 11/2"
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.036 50,000.00 1,800.00
2. Tukang Batu Hari/Orang 0.060 75,000.00 4,500.00
3. Kepala Tukang Hari/Orang 0.006 -
4. Mandor Hari/Orang 0.0018 -
JUMLAH 6,300.00
B. BAHAN
1. Pipa PVC M' 1.200 15,450.00 18,540.00
2. Perlengkapan 35 % harga pipa Ls 0.350 - -
JUMLAH 18,540.00
JUMLAH A + B 24,840.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.054 50,000.00 2,700.00
2. Tukang Batu Hari/Orang 0.090 75,000.00 6,750.00
3. Kepala Tukang Hari/Orang 0.009 -
4. Mandor Hari/Orang 0.0027 -
JUMLAH 9,450.00
B. BAHAN
1. Pipa PVC M' 1.200 19,700.00 23,640.00
2. Perlengkapan 35 % harga pipa Ls 0.350 - -
JUMLAH 23,640.00
JUMLAH A + B 33,090.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.081 50,000.00 4,050.00
2. Tukang Batu Hari/Orang 0.135 75,000.00 10,125.00
3. Kepala Tukang Hari/Orang 0.0135 -
4. Mandor Hari/Orang 0.0041 -
JUMLAH 14,175.00
B. BAHAN
1. Pipa PVC M' 1.200 41,200.00 49,440.00
2. Perlengkapan 35 % harga pipa Ls 0.350 - -
JUMLAH 49,440.00
JUMLAH A + B 63,615.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.081 50,000.00 4,050.00
2. Tukang Batu Hari/Orang 0.135 75,000.00 10,125.00
3. Kepala Tukang Hari/Orang 0.0135 -
4. Mandor Hari/Orang 0.0041 -
JUMLAH 14,175.00
B. BAHAN
1. Pipa PVC M' 1.200 59,916.67 71,900.00
2. Perlengkapan 35 % harga pipa Ls 0.350 -
JUMLAH 71,900.00
JUMLAH A + B 86,075.00
56. Memasang 1 buah kran diameter 3/4" atau 1/2"
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.010 50,000.00 500.00
2. Tukang Batu Hari/Orang 0.100 75,000.00 7,500.00
3. Kepala Tukang Hari/Orang 0.010 -
4. Mandor Hari/Orang 0.005 -
JUMLAH 8,000.00
B. BAHAN
1. Kran air Buah 1.000 30,000.00 30,000.00
2. Seal tape Buah 0.025 5,500.00 137.50
JUMLAH 30,137.50
JUMLAH A + B 38,137.50
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.054 50,000.00 2,700.00
2. Tukang Batu Hari/Orang 0.090 75,000.00 6,750.00
3. Kepala Tukang Hari/Orang 0.009 -
4. Mandor Hari/Orang 0.027 -
JUMLAH 9,450.00
B. BAHAN
1. Pipa galvanis M' 1.200 20,000 24,000.00
2. Perlengkapan 35 % harga pipa - - -
JUMLAH 24,000.00
JUMLAH A + B 33,450.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.054 50,000.00 2,700.00
2. Tukang Batu Hari/Orang 0.090 75,000.00 6,750.00
3. Kepala Tukang Hari/Orang 0.009 -
4. Mandor Hari/Orang 0.027 -
JUMLAH 9,450.00
B. BAHAN
1. Pipa galvanis M' 1.200 27,917 33,500.00
2. Perlengkapan 35 % harga pipa - - -
JUMLAH 33,500.00
JUMLAH A + B 42,950.00
B. BAHAN
1. Pipa galvanis M' 1.200 39,167 47,000.00
2. Perlengkapan 35 % harga pipa - - -
JUMLAH 47,000.00
JUMLAH A + B 56,450.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.108 50,000.00 5,400.00
2. Tukang Batu Hari/Orang 0.180 75,000.00 13,500.00
3. Kepala Tukang Hari/Orang 0.018 -
4. Mandor Hari/Orang 0.0054 -
JUMLAH 18,900.00
B. BAHAN
1. Pipa galvanis M' 1.200 59,167 71,000.00
2. Perlengkapan 35 % harga pipa - - -
JUMLAH 71,000.00
JUMLAH A + B 89,900.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.108 50,000.00 5,400.00
2. Tukang Batu Hari/Orang 0.180 75,000.00 13,500.00
3. Kepala Tukang Hari/Orang 0.018 -
4. Mandor Hari/Orang 0.0054 -
JUMLAH 18,900.00
B. BAHAN
1. Pipa galvanis M' 1.200 74,166.67 89,000.00
2. Perlengkapan 35 % harga pipa Ls - - 31,150.00
JUMLAH 120,150.00
JUMLAH A + B 139,050.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.108 50,000.00 5,400.00
2. Tukang Batu Hari/Orang 0.180 75,000.00 13,500.00
3. Kepala Tukang Hari/Orang 0.018 -
4. Mandor Hari/Orang 0.0054 -
JUMLAH 18,900.00
B. BAHAN
1. Pipa galvanis M' 1.200 129,167 155,000.00
2. Perlengkapan 35 % harga pipa - - -
JUMLAH 155,000.00
JUMLAH A + B 173,900.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.010 50,000.00 500.00
2. Tukang Batu Hari/Orang 0.100 75,000.00 7,500.00
3. Kepala Tukang Hari/Orang 0.010 -
4. Mandor Hari/Orang 0.005 -
JUMLAH 8,000.00
B. BAHAN
1. Floor drain Buah 1.000 35,000.00 35,000.00
JUMLAH 35,000.00
JUMLAH A + B 43,000.00
6.2 1 buah pasang kunci tanam biasa
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.010 50,000.00 500.00
2. Tukang Kayu Hari/Orang 0.500 75,000.00 37,500.00
3. Kepala Tukang Hari/Orang 0.010 -
4. Mandor Hari/Orang 0.005 -
JUMLAH 38,000.00
B. BAHAN
1. Kunci tanam biasa Buah 1.000 150,000.00 150,000.00
JUMLAH 150,000.00
JUMLAH A + B 188,000.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.015 50,000.00 750.00
2. Tukang Kayu Hari/Orang 0.150 75,000.00 11,250.00
3. Kepala Tukang Hari/Orang 0.015 -
4. Mandor Hari/Orang 0.00075 -
JUMLAH 12,000.00
B. BAHAN
1. Engsel pintu Buah 1.000 25,000.00 25,000.00
JUMLAH 25,000.00
JUMLAH A + B 37,000.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.010 50,000.00 500.00
2. Tukang Kayu Hari/Orang 0.100 75,000.00 7,500.00
3. Kepala Tukang Hari/Orang 0.010 -
4. Mandor Hari/Orang 0.0005 -
JUMLAH 8,000.00
B. BAHAN
1. Engsel jendela Buah 1.000 25,000.00 25,000.00
JUMLAH 25,000.00
JUMLAH A + B 33,000.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 3.000 50,000.00 150,000.00
2. Tukang Hari/Orang 0.050 75,000.00 3,750.00
JUMLAH 153,750.00
B. BAHAN
1. Kawat Beronjong Buah 1.000 250,000.00 250,000.00
1. Batu Kali 10/20 cm m³ 1.200 137,500.00 165,000.00
JUMLAH 415,000.00
JUMLAH A + B 568,750.00
DAFTAR ANALISA
PROGRAM : PAMSIMAS
PEKERJAAN : SARANA AIR MINUM DAN SANITASI
LOKASI : Desa Mattirowalie Kabupaten Wajo
TAHUN ANGGARAN : 2011
B. BAHAN
1. Kayu terentang M3 0.040 750,000.00 30,000.00
2. Paku biasa 2" - 5' Kg 0.400 20,000.00 8,000.00
3. Minyak bekisting Ltr 0.200 4,000.00 800.00
4. Balok kayu borneo M3 0.018 1,500,000.00 27,000.00
5. Plywood tebal 9 mm Lmbr 0.350 120,000.00 42,000.00
JUMLAH 107,800.00
JUMLAH A + B 137,100.00
6.32 1 m2 Pasang bekisting untuk lantai
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.320 40,000.00 12,800.00
2. Tukang Batu Hari/Orang 0.330 50,000.00 16,500.00
3. Kepala Tukang Hari/Orang 0.033 -
4. Mandor Hari/Orang 0.006 -
JUMLAH 29,300.00
B. BAHAN
1. Kayu terentang M3 0.040 750,000.00 30,000.00
2. Paku biasa 2" - 5' Kg 0.400 20,000.00 8,000.00
3. Minyak bekisting Ltr 0.200 -
4. Balok kayu borneo M3 0.015 1,500,000.00 22,500.00
5. Plywood tebal 9 mm Lmbr 0.350 120,000.00 42,000.00
JUMLAH 102,500.00
JUMLAH A + B 131,800.00
6.33 1 m2 Pasang bekisting untuk dinding
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.320 40,000.00 12,800.00
2. Tukang Kayu Hari/Orang 0.330 50,000.00 16,500.00
JUMLAH 29,300.00
B. BAHAN
1. Kayu terentang M3 0.030 750,000.00 22,500.00
2. Paku biasa 2" - 5' Kg 0.400 20,000.00 8,000.00
3. Minyak bekisting Ltr 0.200 - -
4. Balok kayu borneo M3 0.020 1,500,000.00 30,000.00
5. Plywood tebal 9 mm Lmbr 0.350 120,000.00 42,000.00
JUMLAH 102,500.00
JUMLAH A + B 131,800.00
6.36 1 m3 Membuat beton dengan mutu K 275
A. TENAGA KERJA
1. Pekerja Hari/Orang 6.000 40,000.00 240,000.00
2. Tukang Batu Hari/Orang 1.000 50,000.00 50,000.00
JUMLAH 290,000.00
B. BAHAN
1. Semen Portland Kg 400.000 1,040.00 416,000.00
2. Pasir beton M3 0.400 100,000.00 40,000.00
3. Koral beton M3 0.820 250,000.00 205,000.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.320 40,000.00 12,800.00
2. Tukang Batu Hari/Orang 0.100 50,000.00 5,000.00
JUMLAH 17,800.00
B. BAHAN
1. Bata merah 5 x 11 x 22 cm Bh 70.000 700.00 49,000.00
2. Semen Portland Kg 11.500 1,040.00 11,960.00
3. Pasir pasang M3 0.043 100,000.00 4,300.00
JUMLAH 65,260.00
JUMLAH A + B 83,060.00
6.3 1 m2 Plesteran 1 Pc : 3 Ps, tebal 15 mm
1. Pekerja Hari/Orang 0.200 40,000.00 8,000.00
2. Tukang Batu Hari/Orang 0.150 50,000.00 7,500.00
JUMLAH 15,500.00
B. BAHAN
1. Semen Portland Kg 6.480 1,040.00 6,739.20
2. Pasir pasang M3
0.019 100,000.00 1,900.00
JUMLAH 8,639.20
JUMLAH A + B 24,139.20
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.054 40,000.00 2,160.00
2. Tukang Batu Hari/Orang 0.090 - -
JUMLAH 2,160.00
B. BAHAN
1. Pipa galvanis M' 1.000 - -
2. Perlengkapan 35 % harga pipa Ls 1.000 - -
JUMLAH -
JUMLAH A + B 2,160.00
6.20 Memasang 1 m' Pipa galvanis diameter /4"
3
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.054 40,000.00 2,160.00
2. Tukang Batu Hari/Orang 0.090 - -
JUMLAH 2,160.00
B. BAHAN
1. Pipa galvanis M' 1.000 - -
2. Perlengkapan 35 % harga pipa Ls 1.000 - -
JUMLAH -
JUMLAH A + B 2,160.00
6.23 Memasang 1 m' Pipa galvanis diameter 2"
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.108 40,000.00 4,320.00
2. Tukang Batu Hari/Orang 0.180 - -
JUMLAH 4,320.00
B. BAHAN
1. Pipa galvanis M' 1.000 - -
2. Perlengkapan 35 % harga pipa Ls 1.000 - -
JUMLAH -
JUMLAH A + B 4,320.00
6.24 Memasang 1 m' Pipa galvanis diameter 2 1/2"
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.108 40,000.00 4,320.00
2. Tukang Batu Hari/Orang 0.180 - -
JUMLAH 4,320.00
B. BAHAN
1. Pipa galvanis M' 1.000 - -
2. Perlengkapan 35 % harga pipa Ls 1.000 - -
JUMLAH -
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.036 40,000.00 1,440.00
2. Tukang Batu Hari/Orang 0.060 - -
JUMLAH 1,440.00
B. BAHAN
1. Pipa PVC M' 1.000 - -
2. Perlengkapan 35 % harga pipa Ls 1.000 - -
JUMLAH -
JUMLAH A + B 1,440.00
6.26 Memasang 1 m' Pipa PVC tipe SNI diameter /4"
3
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.036 40,000.00 1,440.00
2. Tukang Batu Hari/Orang 0.060 - -
JUMLAH 1,440.00
B. BAHAN
1. Pipa PVC M' 1.000 - -
2. Perlengkapan 35 % harga pipa Ls 1.000 - -
JUMLAH -
JUMLAH A + B 1,440.00
6.27 Memasang 1 m' Pipa PVC tipe SNI diameter 1"
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.036 40,000.00 1,440.00
2. Tukang Batu Hari/Orang 0.060 - -
JUMLAH 1,440.00
B. BAHAN
1. Pipa PVC M' 1.000 - -
2. Perlengkapan 35 % harga pipa Ls 1.000 - -
JUMLAH -
JUMLAH A + B 1,440.00
6.28 Memasang 1 m' Pipa PVC tipe SNI diameter 1 /2"
1
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.050 40,000.00 2,000.00
2. Tukang Batu Hari/Orang 0.060 - -
JUMLAH 2,000.00
B. BAHAN
1. Pipa PVC M' 1.000 - -
2. Perlengkapan 35 % harga pipa Ls 1.000 - -
JUMLAH -
JUMLAH A + B 2,000.00
6.29 Memasang 1 m' Pipa PVC tipe SNI diameter 2"
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.054 40,000.00 2,160.00
2. Tukang Batu Hari/Orang 0.090 - -
JUMLAH 2,160.00
B. BAHAN
1. Pipa PVC M' 1.000 - -
2. Perlengkapan 35 % harga pipa Ls 1.000 - -
JUMLAH -
JUMLAH A + B 2,160.00
SNI 2835:2008
Menggali 1 m3 tanah biasa sedalam 1 meter
0.7500 Pekerja x Rp. - Rp. -
0.0250 Mandor x Rp. - Rp. -
Jumlah Rp. -
SNI 2835:2008
Menggali 1 m3 tanah biasa sedalam 2 meter
0.9000 Pekerja x Rp. - Rp. -
0.0450 Mandor x Rp. - Rp. -
Jumlah Rp. -
SNI 2835:2008
Menggali 1 m3 tanah biasa sedalam 3 meter
1.0500 Pekerja x Rp. - Rp. -
0.0670 Mandor x Rp. - Rp. -
Jumlah Rp. -
SNI 2835:2008
Menggali 1 m3 tanah keras sedalam 1 meter
1.0000 Pekerja x Rp. - Rp. -
0.0320 Mandor x Rp. - Rp. -
Jumlah Rp. -
SNI 2835:2008
Menggali 1 m3 tanah lumpur sedalam 1 meter
1.2000 Pekerja x Rp. - Rp. -
0.0450 Mandor x Rp. - Rp. -
Jumlah Rp. -
SNI 2835:2008
Menggali 1 m3 Tanah cadas sedalam 1 meter
1.5000 Pekerja x Rp. - Rp. -
0.0600 Mandor x Rp. - Rp. -
Jumlah Rp. -
SNI 2835:2008
Mengerjakan 1 m2 Stripping tebing setinggi 1 meter
0.0500 Pekerja x Rp. - Rp. -
0.0050 Mandor x Rp. - Rp. -
Jumlah Rp. -
SNI 2835:2008
Membuang 1 m3 Tanah sejauh 15 meter
0.3300 Pekerja x Rp. - Rp. -
0.0100 Mandor x Rp. - Rp. -
Jumlah Rp. -
SNI 2835:2008
Mengurug Kembali 1 m3 galian (1/3 indeks pek.Galian)
0.2500 Pekerja x Rp. - Rp. -
0.0083 Mandor x Rp. - Rp. -
Jumlah Rp. -
SNI 2835:2008
Memadatkan 1 m3 tanah (per 20 cm)
0.5000 Pekerja x Rp. - Rp. -
0.0500 Mandor x Rp. - Rp. -
Jumlah Rp. -
SNI 2835:2008
Mengurug 1 m3 Pasir Urug
1.2000 M3 Pasir Timbunan x Rp. - Rp. -
0.3000 Pekerja x Rp. - Rp. -
0.0100 Mandor x Rp. - Rp. -
Jumlah Rp. -
- hal. 01 -
1 m3 Pek. Timbunan Sirtu
1.2000 M3 Sirtu x Rp. - Rp. -
0.3000 Pekerja x Rp. - Rp. -
0.0100 Mandor x Rp. - Rp. -
Jumlah Rp. -
SNI 2835:2008
Mengurug 1 m3 sirtu padat untuk penginggian lantai bangunan
1.2000 M3 Sirtu x Rp. - Rp. -
0.2500 Pekerja x Rp. - Rp. -
0.0250 Mandor x Rp. - Rp. -
Jumlah Rp. -
SNI 2836:2008
Memasang 1 m3 batu kosong (anstamping)
1.2000 M3 Batu Kali (batu belah 15/20 cm x Rp. - Rp. -
0.4320 M3 Pair Uurg x Rp. - Rp. -
0.7800 Pekerja x Rp. - Rp. -
0.3900 Tukang Batu x Rp. - Rp. -
0.0390 Kepala Tukang x Rp. - Rp. -
0.0390 Mandor x Rp. - Rp. -
Jumlah Rp. -
SNI 2836:2008
Memasang 1 m3 pondasi batu belah, campuran 1 PC : 3 PP
1.2000 M3 Batu Kali (batu belah 15/20 cm x Rp. - Rp. -
4.0400 Zak Semen 50 Kg x Rp. - Rp. -
0.4850 M3 Pasir Pasangan x Rp. - Rp. -
0.7500 Tukang Batu x Rp. - Rp. -
0.0750 Kepala Tukang x Rp. - Rp. -
1.5000 Pekerja x Rp. - Rp. -
0.0750 Mandor x Rp. - Rp. -
Jumlah Rp. -
SNI 2836:2008
Memasang 1 m3 pondasi batu belah, campuran 1 PC : 4 PP
1.2000 M3 Batu Kali (batu belah 15/20 cm x Rp. - Rp. -
3.2600 Zak Semen 50 Kg x Rp. - Rp. -
0.5220 M3 Pasir Pasangan x Rp. - Rp. -
0.7500 Tukang Batu x Rp. - Rp. -
0.0750 Kepala Tukang x Rp. - Rp. -
1.5000 Pekerja x Rp. - Rp. -
0.0750 Mandor x Rp. - Rp. -
Jumlah Rp. -
SNI 2836:2008
Memasang 1 m3 Pondasi batu belah, campuran 1 PC : 5 PP
1.2000 M3 Batu Kali (batu belah 15/20 cm x Rp. - Rp. -
2.7200 Zak Semen 50 Kg x Rp. - Rp. -
0.5440 M3 Pasir Pasangan x Rp. - Rp. -
0.7500 Tukang Batu x Rp. - Rp. -
0.0750 Kepala Tukang x Rp. - Rp. -
1.5000 Pekerja x Rp. - Rp. -
0.0750 Mandor x Rp. - Rp. -
Jumlah Rp. -
- hal. 02 -
SNI 2836:2008
Memasang 1 m3 Pondasi batu belah, campuran 1 PC : 8 PP
1.2000 M3 Batu Gunung x Rp. - Rp. -
2.3400 zak Semen 50 Kg x Rp. - Rp. -
0.5610 M3 Pasir Pasangan x Rp. - Rp. -
1.5000 Tukang Batu x Rp. - Rp. -
0.7500 Kepala Tukang x Rp. - Rp. -
0.0750 Pekerja x Rp. - Rp. -
0.0750 Mandor x Rp. - Rp. -
Jumlah Rp. -
SNI 6987:2008
Memasang 1 m2 dinding bata merah ukuran (5x11x22) cm tebal 1/2 bata, Campuran spesi 1 PC : 2 PP
70.0000 Biji Batu Bata x Rp. - Rp. -
0.3790 Zak Semen 50 Kg x Rp. - Rp. -
0.0380 M3 Pasir Pasangan x Rp. - Rp. -
0.1000 Tukang Batu x Rp. - Rp. -
0.0100 Kepala Tukang x Rp. - Rp. -
0.3000 Pekerja x Rp. - Rp. -
0.0150 Mandor x Rp. - Rp. -
Jumlah Rp. -
SNI 6987:2008
Memasang 1 m2 dinding bata merah ukuran (5x11x22) cm tebal 1/2 bata, Campuran spesi 1 PC : 4 PP
70.0000 Biji Batu Bata x Rp. - Rp. -
0.2300 Zak Semen 50 Kg x Rp. - Rp. -
0.0430 M3 Pasir Pasangan x Rp. - Rp. -
0.1000 Tukang Batu x Rp. - Rp. -
0.0100 Kepala Tukang x Rp. - Rp. -
0.3000 Pekerja x Rp. - Rp. -
0.0150 Mandor x Rp. - Rp. -
Jumlah Rp. -
SNI 6987:2008
Memasang 1 m2 dinding bata merah ukuran (5x11x22) cm tebal 1/2 bata, Campuran spesi 1 PC : 3 PP
70.0000 Biji Batu Bata x Rp. - Rp. -
0.2874 Zak Semen 50 Kg x Rp. - Rp. -
0.0400 M3 Pasir Pasangan x Rp. - Rp. -
0.1000 Tukang Batu x Rp. - Rp. -
0.0100 Kepala Tukang x Rp. - Rp. -
0.3000 Pekerja x Rp. - Rp. -
0.0150 Mandor x Rp. - Rp. -
Jumlah Rp. -
SNI 6987:2008
Memasang 1 m2 dinding bata merah ukuran (5x11x22) cm tebal 1/2 bata, Campuran spesi 1 PC : 5 PP
70.0000 Biji Batu Bata x Rp. - Rp. -
0.1936 Zak Semen 50 Kg x Rp. - Rp. -
0.0450 M3 Pasir Pasangan x Rp. - Rp. -
0.1000 Tukang Batu x Rp. - Rp. -
0.0100 Kepala Tukang x Rp. - Rp. -
0.3000 Pekerja x Rp. - Rp. -
0.0150 Mandor x Rp. - Rp. -
Jumlah Rp. -
SNI 6987:2008
Memasang 1 m2 dinding Concrete Block 20, Campuran 1 PC : 3 PP
12.5000 Biji Batu Batako x Rp. - Rp. -
0.6064 Zak Semen 50 Kg x Rp. - Rp. -
0.7280 M3 Pasir Pasangan x Rp. - Rp. -
0.1500 Tukang Batu x Rp. - Rp. -
0.0150 Kepala Tukang x Rp. - Rp. -
0.3500 Pekerja x Rp. - Rp. -
0.0180 Mandor x Rp. - Rp. -
Jumlah Rp. -
- hal. 03 -
SNI 6987:2008
Memasang 1 m2 dinding Concrete Block 20, Campuran 1 PC : 4 PP
12.5000 Biji Batu Batako x Rp. - Rp. -
0.4852 Zak Semen 50 Kg x Rp. - Rp. -
0.7720 M3 Pasir Pasangan x Rp. - Rp. -
0.1500 Tukang Batu x Rp. - Rp. -
0.0150 Kepala Tukang x Rp. - Rp. -
0.3500 Pekerja x Rp. - Rp. -
0.0180 Mandor x Rp. - Rp. -
Jumlah Rp. -
SNI 7394:2008
Membuat 1 m3 lantai kerja beton mutu f'c =7,4 Mpa (K100) slump (3-6) cm, w/c = 0,87
4.6000 Zak Semen 50 Kg x Rp. - Rp. -
0.6379 M 3
Pasir Beton / Kasar x Rp. - Rp. -
0.7607 M3 Batu Pecah 2-3 x Rp. - Rp. -
200 Air x Rp. 100.00 Rp. 20,000.00
0.2000 Tukang Batu x Rp. - Rp. -
0.0200 Kepala Tukang x Rp. - Rp. -
1.2000 Pekerja x Rp. - Rp. -
0.0600 Mandor x Rp. - Rp. -
Jumlah Rp. 20,000.00
SNI 7394:2008
Membuat 1 m3 beton mutu f'c =7,4 Mpa (K100) slump (12+-2) cm, w/c = 0,87
4.9400 Zak Semen 50 Kg x Rp. - Rp. -
0.6207 M3 Pasir Beton / Kasar x Rp. - Rp. -
0.7400 M3 Batu Pecah 2-3 x Rp. - Rp. -
200 Air x Rp. 100.00 Rp. 20,000.00
0.2750 Tukang Batu x Rp. - Rp. -
0.0280 Kepala Tukang x Rp. - Rp. -
1.6500 Pekerja x Rp. - Rp. -
0.0830 Mandor x Rp. - Rp. -
Jumlah Rp. 20,000.00
SNI 7394:2008
Membuat 1 m3 beton mutu f'c =9,8 Mpa (K125) slump (12+-2) cm, w/c = 0,78
5.5200 Zak Semen 50 Kg x Rp. - Rp. -
0.5914 M3 Pasir Beton / Kasar x Rp. - Rp. -
0.7496 M3 Batu Pecah 2-3 x Rp. - Rp. -
200 Air x Rp. 100.00 Rp. 20,000.00
0.2750 Tukang Batu x Rp. - Rp. -
0.0280 Kepala Tukang x Rp. - Rp. -
1.6500 Pekerja x Rp. - Rp. -
0.0830 Mandor x Rp. - Rp. -
Jumlah Rp. 20,000.00
SNI 7394:2008
Membuat 1 m3 beton mutu f'c =12,2 Mpa (K150) slump (12+-2) cm, w/c = 0,72
5.9800 Zak Semen 50 Kg x Rp. - Rp. -
0.5707 M3 Pasir Beton / Kasar x Rp. - Rp. -
0.7533 M3 Batu Pecah 2-3 x Rp. - Rp. -
200 Air x Rp. 100.00 Rp. 20,000.00
0.2750 Tukang Batu x Rp. - Rp. -
0.0280 Kepala Tukang x Rp. - Rp. -
1.6500 Pekerja x Rp. - Rp. -
0.0830 Mandor x Rp. - Rp. -
Jumlah Rp. 20,000.00
SNI 7394:2008
Membuat 1 m3 beton mutu f'c =14,5 Mpa (K175) slump (12+-2) cm, w/c = 0,66
6.5200 Zak Semen 50 Kg x Rp. - Rp. -
0.5429 M3 Pasir Beton / Kasar x Rp. - Rp. -
0.7622 M3 Batu Pecah 2-3 x Rp. - Rp. -
215 Air x Rp. 100.00 Rp. 21,500.00
0.2750 Tukang Batu x Rp. - Rp. -
0.0280 Kepala Tukang x Rp. - Rp. -
1.6500 Pekerja x Rp. - Rp. -
0.0830 Mandor x Rp. - Rp. -
Jumlah Rp. 21,500.00
- hal. 04 -
SNI 7394:2008
Membuat 1 m3 beton mutu f'c =16,9 Mpa (K200) slump (12+-2) cm, w/c = 0,61
7.0400 Zak Semen 50 Kg x Rp. - Rp. -
0.5221 M3 Pasir Beton / Kasar x Rp. - Rp. -
0.7637 M3 Batu Pecah 2-3 x Rp. - Rp. -
215 Air x Rp. 100.00 Rp. 21,500.00
0.2750 Tukang Batu x Rp. - Rp. -
0.0280 Kepala Tukang x Rp. - Rp. -
1.6500 Pekerja x Rp. - Rp. -
0.0830 Mandor x Rp. - Rp. -
Jumlah Rp. 21,500.00
SNI 7394:2008
Membuat 1 m3 beton mutu f'c =19,3 Mpa (K225) slump (12+-2) cm, w/c = 0,58
7.4200 Zak Semen 50 Kg x Rp. - Rp. -
0.4986 M3 Pasir Beton / Kasar x Rp. - Rp. -
0.7756 M3 Batu Pecah 2-3 x Rp. - Rp. -
215 Air x Rp. 100.00 Rp. 21,500.00
0.2750 Tukang Batu x Rp. - Rp. -
0.0280 Kepala Tukang x Rp. - Rp. -
1.6500 Pekerja x Rp. - Rp. -
0.0830 Mandor x Rp. - Rp. -
Jumlah Rp. 21,500.00
SNI 7394:2008
Membuat 1 m3 beton mutu f'c =21,7 Mpa (K250) slump (12+-2) cm, w/c = 0,56
7.6800 Zak Semen 50 Kg x Rp. - Rp. -
0.4943 M3 Pasir Beton / Kasar x Rp. - Rp. -
0.7696 M3 Batu Pecah 2-3 x Rp. - Rp. -
215 Air x Rp. 100.00 Rp. 21,500.00
0.2750 Tukang Batu x Rp. - Rp. -
0.0280 Kepala Tukang x Rp. - Rp. -
1.6500 Pekerja x Rp. - Rp. -
0.0830 Mandor x Rp. - Rp. -
Jumlah Rp. 21,500.00
SNI 7394:2008
Membuat 1 m3 beton mutu f'c =24 Mpa (K275) slump (12+-2) cm, w/c = 0,53
8.1200 Zak Semen 50 Kg x Rp. - Rp. -
0.4886 M3 Pasir Beton / Kasar x Rp. - Rp. -
0.7600 M3 Batu Pecah 2-3 x Rp. - Rp. -
215 Air x Rp. 100.00 Rp. 21,500.00
0.2750 Tukang Batu x Rp. - Rp. -
0.0280 Kepala Tukang x Rp. - Rp. -
1.6500 Pekerja x Rp. - Rp. -
0.0830 Mandor x Rp. - Rp. -
Jumlah Rp. 21,500.00
SNI 7394:2008
Membuat 1 m3 beton mutu f'c =26,4 Mpa (K300) slump (12+-2) cm, w/c = 0,52
8.2600 Zak Semen 50 Kg x Rp. - Rp. -
0.4864 M3 Pasir Beton / Kasar x Rp. - Rp. -
0.7563 M3 Batu Pecah 2-3 x Rp. - Rp. -
215 Air x Rp. 100.00 Rp. 21,500.00
0.2750 Tukang Batu x Rp. - Rp. -
0.0280 Kepala Tukang x Rp. - Rp. -
1.6500 Pekerja x Rp. - Rp. -
0.0830 Mandor x Rp. - Rp. -
Jumlah Rp. 21,500.00
SNI 7394:2008
Membuat 1 m3 beton mutu f'c =28,8 Mpa (K325) slump (12+-2) cm, w/c = 0,49
8.7800 Zak Semen 50 Kg x Rp. - Rp. -
0.4786 M3 Pasir Beton / Kasar x Rp. - Rp. -
0.7452 M3 Batu Pecah 2-3 x Rp. - Rp. -
215 Air x Rp. 100.00 Rp. 21,500.00
0.3500 Tukang Batu x Rp. - Rp. -
0.0350 Kepala Tukang x Rp. - Rp. -
2.1000 Pekerja x Rp. - Rp. -
0.1050 Mandor x Rp. - Rp. -
Jumlah Rp. 21,500.00
- hal. 05 -
SNI 7394:2008
Membuat 1 m3 beton mutu f'c =31,2 Mpa (K350) slump (12+-2) cm, w/c = 0,52 (A)
8.9600 Zak Semen 50 Kg x Rp. - Rp. -
0.4764 M3 Pasir Beton / Kasar x Rp. - Rp. -
0.7407 M3 Batu Pecah 2-3 x Rp. - Rp. -
215 Air x Rp. 100.00 Rp. 21,500.00
0.3500 Tukang Batu x Rp. - Rp. -
0.0350 Kepala Tukang x Rp. - Rp. -
2.1000 Pekerja x Rp. - Rp. -
0.1050 Mandor x Rp. - Rp. -
Jumlah Rp. 21,500.00
SNI 7394:2008
Pembesian 10 kg dengan besi polos atau besi ulir (B)
10.5000 Kg Besi Beton x Rp. - Rp. -
0.1500 Kg Kawat Beton x Rp. - Rp. -
0.0700 Tukang Besi x Rp. - Rp. -
0.0070 Kepala Tukang x Rp. - Rp. -
0.0700 Pekerja x Rp. - Rp. -
0.0040 Mandor x Rp. - Rp. -
Jumlah 10 kg Rp. -
1 kg Rp. -
SNI 7394:2008
Bahan Bekesting (Cetakan) ( C )
Memasang 1 m2 bekesting untuk pondasi
0.0400 M3 Kayu Balok Kls III x Rp. - Rp. -
0.3000 kg Paku 5 cm- 10 cm x Rp. - -
0.1000 ltr Minyak bekesting x Rp. - -
0.2600 Tukang Kayu x Rp. - Rp. -
0.0260 Kepala Tukang x Rp. - Rp. -
0.5200 Pekerja x Rp. - Rp. -
0.0260 Mandor x Rp. - Rp. -
Jumlah Rp. -
SNI 7394:2008
Memasang 1 m2 bekesting untuk Sloof
0.0450 M3 Kayu Balok Kls III x Rp. - Rp. -
0.3000 kg Paku 5 cm- 10 cm x Rp. - -
0.1000 ltr Minyak bekesting x Rp. - -
0.2600 Tukang Kayu x Rp. - Rp. -
0.0260 Kepala Tukang x Rp. - Rp. -
0.5200 Pekerja x Rp. - Rp. -
0.0260 Mandor x Rp. - Rp. -
Jumlah Rp. -
SNI 7394:2008
Memasang 1 m2 bekesting untuk Kolom
0.0400 M3 Kayu Balok Kls III x Rp. - Rp. -
0.4000 kg Paku 5 cm- 12 cm x Rp. - Rp. -
0.2000 ltr Minyak bekesting x Rp. - Rp. -
0.0150 m3 Balok Kayu Kals II x Rp. - Rp. -
0.3500 lbr Plywood tebal 9 mm x Rp. - Rp. -
2.0000 Btg dolken 8-10cm/4m (KlasIII) x Rp. - Rp. -
0.3300 Tukang Kayu x Rp. - Rp. -
0.0330 Kepala Tukang x Rp. - Rp. -
0.6600 Pekerja x Rp. - Rp. -
0.0330 Mandor x Rp. - Rp. -
Jumlah Rp. -
- hal. 06 -
SNI 7394:2008
Memasang 1 m2 bekesting untuk Balok
0.0400 M3 Kayu Balok Kls III x Rp. - Rp. -
0.4000 kg Paku 5 cm- 12 cm x Rp. - Rp. -
0.2000 ltr Minyak bekesting x Rp. - Rp. -
0.0180 m3 Balok Kayu Kals II x Rp. - Rp. -
0.3500 lbr Plywood tebal 9 mm x Rp. - Rp. -
2.0000 Btg dolken 8-10cm/4m (KlasIII) x Rp. - Rp. -
0.3300 Tukang Kayu x Rp. - Rp. -
0.0330 Kepala Tukang x Rp. - Rp. -
0.6600 Pekerja x Rp. - Rp. -
0.0330 Mandor x Rp. - Rp. -
Jumlah Rp. -
SNI 7394:2008
Memasang 1 m2 bekesting untuk plat lantai
0.0400 M3 Kayu Balok Kls III x Rp. - Rp. -
0.4000 kg Paku 5 cm- 12 cm x Rp. - Rp. -
0.2000 ltr Minyak bekesting x Rp. - Rp. -
0.0150 m3 Balok Kayu Kals II x Rp. - Rp. -
0.3500 lbr Plywood tebal 9 mm x Rp. - Rp. -
6.0000 Btg dolken 8-10cm/4m (KlasIII) x Rp. - Rp. -
0.3300 Tukang Kayu x Rp. - Rp. -
0.0330 Kepala Tukang x Rp. - Rp. -
0.6600 Pekerja x Rp. - Rp. -
0.0330 Mandor x Rp. - Rp. -
Jumlah Rp. -
SNI 7394:2008
Memasang 1 m2 bekesting untuk dinding
0.0300 M3 Kayu Balok Kls III x Rp. - Rp. -
0.4000 kg Paku 5 cm- 12 cm x Rp. - Rp. -
0.2000 ltr Minyak bekesting x Rp. - Rp. -
0.0200 m3 Balok Kayu Kals II x Rp. - Rp. -
0.3500 lbr Plywood tebal 9 mm x Rp. - Rp. -
3.0000 Btg dolken 8-10cm/4m (KlasIII) x Rp. - Rp. -
0.3300 Tukang Kayu x Rp. - Rp. -
0.0330 Kepala Tukang x Rp. - Rp. -
0.6600 Pekerja x Rp. - Rp. -
0.0330 Mandor x Rp. - Rp. -
Jumlah Rp. -
SNI 7394:2008
Memasang 1 m2 bekesting untuk tangga
0.0300 M3 Kayu Balok Kls III x Rp. - Rp. -
0.4000 kg Paku 5 cm- 12 cm x Rp. - Rp. -
0.1500 ltr Minyak bekesting x Rp. - Rp. -
0.0150 m3 Balok Kayu Kals II x Rp. - Rp. -
0.3500 lbr Plywood tebal 9 mm x Rp. - Rp. -
2.0000 Btg dolken 8-10cm/4m (KlasIII) x Rp. - Rp. -
0.3300 Tukang Kayu x Rp. - Rp. -
0.0330 Kepala Tukang x Rp. - Rp. -
0.6600 Pekerja x Rp. - Rp. -
0.0330 Mandor x Rp. - Rp. -
Jumlah Rp. -
SNI 7394:2008
Memasang 1 m2 Jembatan untuk Pengecoran beton
0.0264 M3 Kayu Balok Kls III x Rp. - Rp. -
0.6000 kg Paku 5 cm- 12 cm x Rp. - Rp. -
0.1500 ltr Minyak bekesting x Rp. - Rp. -
0.5000 Btg dolken 8-10cm/4m (KlasIII) x Rp. - Rp. -
0.0500 Tukang Kayu x Rp. - Rp. -
0.0050 Kepala Tukang x Rp. - Rp. -
0.1500 Pekerja x Rp. - Rp. -
0.0080 Mandor x Rp. - Rp. -
Jumlah Rp. -
- hal. 07 -
SNI 7394:2008
Membuat 1 m3 pondasi beton bertulang (150 kg besi+bekesting)
Beton
bahan
6.7200 zak Semen 50 Kg x Rp. - Rp. -
0.5400 m3 Pasir beton' x Rp. - Rp. -
0.8100 m3 kerikil x Rp. - Rp. -
upah
0.2750 Tukang Batu x Rp. - Rp. -
0.2620 Kepala Tukang x Rp. - Rp. -
5.3000 Pekerja x Rp. - Rp. -
0.2650 Mandor x Rp. - Rp. -
Rp. -
Besi 150 kg
bahan
157.5000 kg Besi beton polos x Rp. - Rp. -
2.2500 kg kawat beton x Rp. - Rp. -
Upah
1.0500 Tukang Besi x Rp. - Rp. -
Rp. -
Bekesting
bahan
0.2000 M3 Kayu Balok Kls III x Rp. - Rp. -
1.5000 kg Paku 5 cm- 12 cm x Rp. - Rp. -
0.4000 ltr Minyak bekesting x Rp. - Rp. -
Upah Rp.
1.3000 Tukang Kayu x Rp. - Rp. -
Rp. -
SNI 7394:2008
Membuat 1 m3 sloof beton bertulang (200 kg besi+bekesting)
Beton
bahan
6.7200 zak Semen 50 Kg x Rp. - Rp. -
0.5400 m3 Pasir beton' x Rp. - Rp. -
0.8100 m3 kerikil x Rp. - Rp. -
upah
0.2750 Tukang Batu x Rp. - Rp. -
0.3230 Kepala Tukang x Rp. - Rp. -
5.6500 Pekerja x Rp. - Rp. -
0.2830 Mandor x Rp. - Rp. -
Rp. -
Besi 200 kg
bahan
210.0000 kg Besi beton polos x Rp. - Rp. -
3.0000 kg kawat beton x Rp. - Rp. -
Upah
1.4000 Tukang Besi x Rp. - Rp. -
Rp. -
Bekesting
bahan
0.2000 M3 Kayu Balok Kls III x Rp. - Rp. -
1.5000 kg Paku 5 cm- 12 cm x Rp. - Rp. -
0.4000 ltr Minyak bekesting x Rp. - Rp. -
Upah Rp.
1.3000 Tukang Kayu x Rp. - Rp. -
Rp. -
- hal. 08 -
SNI 7394:2008
Membuat 1 m3 Kolom beton bertulang (300 kg besi+bekesting)
Beton
bahan
6.7200 zak Semen 50 Kg x Rp. - Rp. -
0.5400 m3 Pasir beton' x Rp. - Rp. -
0.8100 m3 kerikil x Rp. - Rp. -
upah
0.2750 Tukang Batu x Rp. - Rp. -
0.4030 Kepala Tukang x Rp. - Rp. -
7.0500 Pekerja x Rp. - Rp. -
0.3530 Mandor x Rp. - Rp. -
Rp. -
Besi 300 kg
bahan
315.0000 kg Besi beton polos x Rp. - Rp. -
4.5000 kg kawat beton x Rp. - Rp. -
Upah
2.1000 Tukang Besi x Rp. - Rp. -
Rp. -
Bekesting
bahan
0.1500 M3 Kayu Klas II x Rp. - Rp. -
0.4000 M3 Kayu Balok Kls III x Rp. - Rp. -
4.0000 kg Paku 5 cm- 12 cm x Rp. - Rp. -
2.0000 ltr Minyak bekesting x Rp. - Rp. -
20.0000 bt dolken 8-10 cm (klas III) x Rp. - Rp. -
Upah
1.6500 Tukang Kayu x Rp. - Rp. -
Rp. -
SNI 7394:2008
Membuat 1 m3 balok beton bertulang (200 kg besi+bekesting)
Beton
bahan
6.7200 zak Semen 50 Kg x Rp. - Rp. -
0.5400 m3 Pasir beton' x Rp. - Rp. -
0.8100 m3 kerikil x Rp. - Rp. -
upah
0.2750 Tukang Batu x Rp. - Rp. -
0.3330 Kepala Tukang x Rp. - Rp. -
6.3500 Pekerja x Rp. - Rp. -
0.3180 Mandor x Rp. - Rp. -
Rp. -
Besi 200 kg
bahan
210.0000 kg Besi beton polos x Rp. - Rp. -
3.0000 kg kawat beton x Rp. - Rp. -
Upah -
1.4000 Tukang Besi x Rp. - Rp. -
Rp. -
Bekesting
bahan
0.15 Kayu Klas II x Rp. - Rp. -
0.3000 M3 Kayu Balok Kls III x Rp. - Rp. -
4.0000 kg Paku 5 cm- 12 cm x Rp. - Rp. -
2.0000 ltr Minyak bekesting x Rp. - Rp. -
Upah
1.6500 Tukang Kayu x Rp. - Rp. -
Rp. -
- hal. 09 -
SNI 7394:2008
Membuat 1 m3 Plat beton bertulang (150 kg besi+bekesting)
Beton
bahan
6.7200 zak Semen 50 Kg x Rp. - Rp. -
0.5400 m3 Pasir beton' x Rp. - Rp. -
0.8100 m3 kerikil x Rp. - Rp. -
upah -
0.2750 Tukang Batu x Rp. - Rp. -
0.2650 Kepala Tukang x Rp. - Rp. -
5.3000 Pekerja x Rp. - Rp. -
0.2650 Mandor x Rp. - Rp. -
Rp. -
Besi 200 kg
bahan
157.5000 kg Besi beton polos x Rp. - Rp. -
2.2500 kg kawat beton x Rp. - Rp. -
Upah
1.0500 Tukang Besi x Rp. - Rp. -
Rp. -
Bekesting
bahan
0.15 Kayu Klas II x Rp. - Rp. -
0.3000 M3 Kayu Balok Kls III x Rp. - Rp. -
4.0000 kg Paku 5 cm- 12 cm x Rp. - Rp. -
2.0000 ltr Minyak bekesting x Rp. - Rp. -
Upah
1.6500 Tukang Kayu x Rp. - Rp. -
Rp. -
SNI 7394:2008
Membuat 1 m3 Dinding beton bertulang (150 kg besi+bekesting)
Beton
bahan
6.7200 zak Semen 50 Kg x Rp. - Rp. -
0.5400 m3 Pasir beton' x Rp. - Rp. -
0.8100 m3 kerikil x Rp. - Rp. -
upah
0.2750 Tukang Batu x Rp. - Rp. -
0.2620 Kepala Tukang x Rp. - Rp. -
5.3000 Pekerja x Rp. - Rp. -
0.2650 Mandor x Rp. - Rp. -
Rp. -
Besi 200 kg
bahan
157.5000 kg Besi beton polos x Rp. - Rp. -
2.2500 kg kawat beton x Rp. - Rp. -
Upah
1.0500 Tukang Besi x Rp. - Rp. -
Rp. -
Bekesting
bahan
0.16 Kayu Klas II x Rp. - Rp. -
0.2400 M3 Kayu Balok Kls III x Rp. - Rp. -
3.2000 kg Paku 5 cm- 12 cm x Rp. - Rp. -
1.6000 ltr Minyak bekesting x Rp. - Rp. -
Upah -
1.3000 Tukang Kayu x Rp. - Rp. -
Rp. -
- hal. 10 -
SNI 7394:2008
Membuat 1 m' kolom praktis beton bertulang (11 x 11) cm
0.0020 M3 Kayu Balok Kls III x Rp. - Rp. -
0.0100 kg Paku 5 cm- 12 cm x Rp. - Rp. -
3.0000 kg Besi beton polos x Rp. - Rp. -
0.0450 kg kawat beton x Rp. - Rp. -
0.0800 zak Semen 50 Kg x Rp. - Rp. -
0.0060 m3 Pasir beton' x Rp. - Rp. -
0.0090 m3 kerikil x Rp. - Rp. -
0.0200 Tukang Batu x Rp. - Rp. -
0.0200 Tukang Kayu x Rp. - Rp. -
0.0200 Tukang Besi x Rp. - Rp. -
0.0060 Kepala Tukang x Rp. - Rp. -
0.1800 Pekerja x Rp. - Rp. -
0.0090 Mandor x Rp. - Rp. -
Jumlah Rp. -
SNI 7394:2008
Membuat 1 m' Ring balok beton bertulang (10 x 15) cm
0.0030 M3 Kayu Balok Kls III x Rp. - Rp. -
0.0200 kg Paku 5 cm- 12 cm x Rp. - Rp. -
3.6000 kg Besi beton polos x Rp. - Rp. -
0.0500 kg kawat beton x Rp. - Rp. -
0.1100 zak Semen 50 Kg x Rp. - Rp. -
0.0090 m3 Pasir beton' x Rp. - Rp. -
0.0150 m3 kerikil x Rp. - Rp. -
0.0330 Tukang Batu x Rp. - Rp. -
0.0330 Tukang Kayu x Rp. - Rp. -
0.0330 Tukang Besi x Rp. - Rp. -
0.0100 Kepala Tukang x Rp. - Rp. -
0.2970 Pekerja x Rp. - Rp. -
0.0150 Mandor x Rp. - Rp. -
Jumlah Rp. -
1 m2 Pek. Paving Block
50.0000 Bh Paving Block 8 cm x Rp. - Rp. -
0.1000 M3 Pasir Pasangan x Rp. - Rp. -
0.1500 Tukang Batu x Rp. - Rp. -
0.6000 Pekerja x Rp. - Rp. -
Jumlah Rp. -
SNI 2837:2008
Memasang 1 m2 plesteran 1 PC : 3 PP, tebal 15 mm
0.1555 Zak Semen Pc 50 Kg x Rp. - Rp. -
0.0230 M3 Pasir Pasangan x Rp. - Rp. -
0.1500 Tukang Batu x Rp. - Rp. -
0.0150 Kepala Tukang x Rp. - Rp. -
0.3000 Pekerja x Rp. - Rp. -
0.0150 Mandor x Rp. - Rp. -
Jumlah Rp. -
SNI 2837:2008
Memasang 1 m2 plesteran 1 PC : 4 PP, tebal 15 mm
0.1248 Zak Semen Pc. 50 Kg x Rp. - Rp. -
0.0240 M3 Pasir Pasangan x Rp. - Rp. -
0.1500 Tukang Batu x Rp. - Rp. -
0.0150 Kepala tukang x Rp. - Rp. -
0.3000 Pekerja x Rp. - Rp. -
0.0150 Mandor x Rp. - Rp. -
Jumlah Rp. -
SNI 2837:2008
Memasang 1 m2 plesteran 1 PC : 5 PP, tebal 15 mm
0.1168 Zak Semen Pc. 50 Kg x Rp. - Rp. -
0.0260 M3 Pasir Pasangan x Rp. - Rp. -
0.1500 Tukang Batu x Rp. - Rp. -
0.0150 Kepala Tukang x Rp. - Rp. -
0.3000 Pekerja x Rp. - Rp. -
0.0150 Mandor x Rp. - Rp. -
Jumlah Rp. -
- hal. 11 -
SNI 2837:2008
Memasang 1 m2 finishing siar pasangan dinding batu bata (=20 m')
0.0622 Zak Semen Pc. 50 Kg x Rp. - Rp. -
0.0750 Tukang Batu x Rp. - Rp. -
0.0080 Kepala Tukang x Rp. - Rp. -
0.1500 Pekerja x Rp. - Rp. -
0.0080 Mandor x Rp. - Rp. -
Jumlah Rp. -
SNI 2837:2008
Memasang 1 m2 finishing siar Pasangan dinding conblock expose (=8m')
0.0320 Zak Semen Pc. 50 Kg x Rp. - Rp. -
0.0350 Tukang Batu x Rp. - Rp. -
0.0040 Kepala Tukang x Rp. - Rp. -
0.0700 Pekerja x Rp. - Rp. -
0.0040 Mandor x Rp. - Rp. -
Jumlah Rp. -
SNI 2837:2008
Memasang 1 m2 finishing siar pasangan batu kali adukan 1 PC:2 PP
0.1268 Zak Semen Pc. 50 Kg x Rp. - Rp. -
0.0120 m3 Pasir Pasangan x Rp. - Rp. -
0.1500 Tukang Batu x Rp. - Rp. -
0.0150 Kepala Tukang x Rp. - Rp. -
0.3000 Pekerja x Rp. - Rp. -
0.0150 Mandor x Rp. - Rp. -
Jumlah Rp. -
SNI 2837:2008
Memasang 1m2 acian
0.0650 Zak Semen 50 kg x Rp. - Rp. -
0.1000 Tukang Batu x Rp. - Rp. -
0.0100 Kepala Tukang x Rp. - Rp. -
0.2000 Pekerja x Rp. - Rp. -
0.0100 Mandor x Rp. - Rp. -
Jumlah Rp. -
SNI 2837:2008
Memasang 1 m2 Lantai keramik ukuran (30x30) cm
0.9892 buah Ubin keramik x Rp. - Rp. -
0.0450 M3 Pasir Pasangan x Rp. - Rp. -
0.2000 Zak Semen 50 kg x Rp. - Rp. -
0.3500 Tukang Batu x Rp. - Rp. -
0.0350 Kepala Tukang x Rp. - Rp. -
0.7000 Pekerja x Rp. - Rp. -
0.0350 Mandor x Rp. - Rp. -
Jumlah Rp. -
SNI 2837:2008
Memasang 1 m2 Lantai keramik ukuran (33x33) cm
0.8333 Dos Ubin keramik x Rp. - Rp. -
0.0450 M3 Pasir Pasangan x Rp. - Rp. -
0.1638 Zak Semen 50 kg x Rp. - Rp. -
0.3500 Tukang Batu x Rp. - Rp. -
0.0350 Kepala Tukang x Rp. - Rp. -
0.7000 Pekerja x Rp. - Rp. -
0.0350 Mandor x Rp. - Rp. -
Jumlah Rp. -
SNI 2837:2008
Memasang 1 m2 Lantai keramik ukuran (20x20) cm
2.2083 Dos Tegel 20 x 20 x Rp. - Rp. -
0.0450 M3 Pasir Pasangan x Rp. - Rp. -
0.2080 Zak Semen 50 kg x Rp. - Rp. -
0.3500 Tukang Batu x Rp. - Rp. -
0.0350 Kepala Tukang x Rp. - Rp. -
0.7000 Pekerja x Rp. - Rp. -
0.0350 Mandor x Rp. - Rp. -
Jumlah Rp. -
- hal. 12 -
SNI 2837:2008
Memasang 1 m2 dinding porselin ukuran (10x20) cm
4.4167 Dos porselin x Rp. - Rp. -
0.0180 M3 Pasir Pasangan x Rp. - Rp. -
0.1860 Zak Semen 50 kg x Rp. - Rp. -
0.4500 Tukang Batu x Rp. - Rp. -
0.0450 Kepala Tukang x Rp. - Rp. -
0.9000 Pekerja x Rp. - Rp. -
0.0450 Mandor x Rp. - Rp. -
Jumlah Rp. -
SNI 2837:2008
Memasang 1 m2 dinding keramik ukuran (20x20) cm
2.2083 Dos Tegel 20 x 20 x Rp. - Rp. -
0.0180 M3 Pasir Pasangan x Rp. - Rp. -
0.1860 Zak Semen 50 kg x Rp. - Rp. -
0.4500 Tukang Batu x Rp. - Rp. -
0.0450 Kepala Tukang x Rp. - Rp. -
0.9000 Pekerja x Rp. - Rp. -
0.0450 Mandor x Rp. - Rp. -
Jumlah Rp. -
SNI 3434:2008
Membuat dan Memasang 1 m3 Kusen Pintu dan kusen jendela kayu klas I
1.1000 M3 Kayu Bayam x Rp. - Rp. -
1.2500 kg pAku 10 cm x Rp. - Rp. -
1.0000 kg Lem Kayu x Rp. 20,000.00 Rp. 20,000.00
21.0000 Tukang Kayu x Rp. - Rp. -
2.1000 Kepala Tukang x Rp. - Rp. -
7.0000 Pekerja x Rp. - Rp. -
0.3500 Mandor x Rp. - Rp. -
Jumlah Rp. 20,000.00
SNI 3434:2008
Membuat dan Memasang 1 m3 Kusen Pintu dan kusen jendela kayu klas II
1.2000 M3 Kayu klas II x Rp. - Rp. -
1.2500 kg pAku 10 cm x Rp. - Rp. -
1.0000 kg Lem Kayu x Rp. 20,000.00 Rp. 20,000.00
18.0000 Tukang Kayu x Rp. - Rp. -
1.8000 Kepala Tukang x Rp. - Rp. -
6.0000 Pekerja x Rp. - Rp. -
0.3000 Mandor x Rp. - Rp. -
Jumlah Rp. 20,000.00
- hal. 13 -
SNI 3434:2008
Membuat dan Memasang 1 m2 Daun Pintu Panel, Kayu Klas I
0.0400 M3 Papan kayu Klas I x Rp. - Rp. -
0.5000 kg Lem Kayu x Rp. 20,000.00 Rp. 10,000.00
3.0000 Tukang Kayu x Rp. - Rp. -
0.3000 Kepala Tukang x Rp. - Rp. -
1.0000 Pekerja x Rp. - Rp. -
0.0500 Mandor x Rp. - Rp. -
Jumlah Rp. 10,000.00
SNI 3434:2008
Membuat dan Memasang 1 m2 Daun Pintu Panel, Kayu Klas II
0.0400 M3 Papan kayu Klas II x Rp. - Rp. -
0.5000 kg Lem Kayu x Rp. 20,000.00 Rp. 10,000.00
3.0000 Tukang Kayu x Rp. - Rp. -
0.3000 Kepala Tukang x Rp. - Rp. -
1.0000 Pekerja x Rp. - Rp. -
0.0500 Mandor x Rp. - Rp. -
Jumlah Rp. 10,000.00
SNI 3434:2008
Memasang 1 m3 Konstruksi kuda2 konvensional, kayu klas II
1.1000 M3 Balok klas II x Rp. - Rp. -
15.0000 kg Besi srip tebal 5 mm x Rp. - Rp. -
5.6000 kg Paku 12 cm x Rp. - Rp. -
12.0000 Tukang Kayu x Rp. - Rp. -
1.2000 Kepala Tukang x Rp. - Rp. -
4.0000 Pekerja x Rp. - Rp. -
0.2000 Mandor x Rp. - Rp. -
Jumlah Rp. -
SNI 3434:2008
Memasang 1 m3 Konstruksi kuda2 konvensional, kayu klas I
1.2000 M3 Kayu Kls I x Rp. - Rp. -
15.0000 kg Besi srip tebal 5 mm x Rp. - Rp. -
5.6000 kg Paku 12 cm x Rp. - Rp. -
20.1000 Tukang Kayu x Rp. - Rp. -
2.0100 Kepala Tukang x Rp. - Rp. -
6.7000 Pekerja x Rp. - Rp. -
0.3350 Mandor x Rp. - Rp. -
Jumlah Rp. -
SNI 3434:2008
Memasang 1 m3 Konstruksi Gording , kayu klas II
1.1000 M3 Kayu Kls II x Rp. - Rp. -
15.0000 kg Besi srip tebal 5 mm x Rp. - Rp. -
3.0000 kg Paku 12 cm x Rp. - Rp. -
7.2000 Tukang Kayu x Rp. - Rp. -
0.7200 Kepala Tukang x Rp. - Rp. -
2.4000 Pekerja x Rp. - Rp. -
0.1200 Mandor x Rp. - Rp. -
Jumlah Rp. -
- hal. 14 -
1 m2 Pek. Atap Seng BJLS 20
6.0000 Kk Seng BJLS 20 (6kk) x Rp. - Rp. -
0.0400 Kg Paku Seng x Rp. - Rp. -
0.2000 Tukang Kayu x Rp. - Rp. -
0.0200 Kepala Tukang x Rp. - Rp. -
0.1000 Pekerja x Rp. - Rp. -
0.0500 Mandor x Rp. - Rp. -
Jumlah Rp. -
- hal. 15 -
1 m2 Pek. Atap Multi Roof
1.6000 m² Atap Multi Roof x Rp. - Rp. -
0.0400 Kg Paku Seng x Rp. - Rp. -
0.2500 Tukang Kayu x Rp. - Rp. -
0.0250 Kepala Tukang x Rp. - Rp. -
0.1500 Pekerja x Rp. - Rp. -
0.0750 Mandor x Rp. - Rp. -
Jumlah Rp. -
- hal. 16 -
1 m2 Pek. Pasangan Atap Policarbonat.
1.0000 m² Atap Policarbonat x Rp. 48,000.00 Rp. 48,000.00
0.0300 Kg Paku biasa. x Rp. - Rp. -
0.0800 Tukang Kayu x Rp. - Rp. -
0.0100 Kepala Tukang x Rp. - Rp. -
0.1500 Pekerja x Rp. - Rp. -
0.0100 Mandor x Rp. - Rp. -
Jumlah Rp. 48,000.00
SNI 3434:2008
Memasang 1 m' lisplank ukuran (3x20) cm. Kayu klas I
0.0108 M3 Papan Bayam x Rp. - Rp. -
0.1000 Kg Paku x Rp. - Rp. -
0.2000 Tukang Kayu x Rp. - Rp. -
0.0200 Kepala Tukang x Rp. - Rp. -
0.1000 Pekerja x Rp. - Rp. -
0.0050 Mandor x Rp. - Rp. -
Jumlah Rp. -
SNI 3434:2008
Memasang 1 m' lisplank ukuran (3x20) cm. Kayu klas II
0.0108 M3 Papan Samarinda x Rp. - Rp. -
0.1000 Kg Paku x Rp. - Rp. -
0.2000 Tukang Kayu x Rp. - Rp. -
0.0200 Kepala Tukang x Rp. - Rp. -
0.1000 Pekerja x Rp. - Rp. -
0.0050 Mandor x Rp. - Rp. -
Jumlah Rp. -
SNI 3434:2008
Memasang 1 m2 rangka langit-langit (50x100) cm, kayu klas II - kaso-kaso (5x7) cm
0.0154 M3 Kaso-kaso (5x7) cm x Rp. - Rp. -
0.2000 Kg Paku x Rp. - Rp. -
0.3000 Tukang Kayu x Rp. - Rp. -
0.0300 Kepala Tukang x Rp. - Rp. -
0.1500 Pekerja x Rp. - Rp. -
0.0750 Mandor x Rp. - Rp. -
Jumlah Rp. -
SNI 3434:2008
Memasang 1 m2 rangka langit-langit (50x100) cm, kayu klas III - kaso-kaso (5x7) cm
0.0154 M3 Kaso-kaso (5x7) cm x Rp. - Rp. -
0.2000 Kg Paku x Rp. - Rp. -
0.3000 Tukang Kayu x Rp. - Rp. -
0.0300 Kepala Tukang x Rp. - Rp. -
0.1500 Pekerja x Rp. - Rp. -
0.0750 Mandor x Rp. - Rp. -
Jumlah Rp. -
SNI 3434:2008
Memasang 1 m2 rangka langit-langit (60x60) cm, kayu klas II
0.0163 M3 Kaso-kaso (5x7) cm x Rp. - Rp. -
0.2500 Kg Paku x Rp. - Rp. -
0.3000 Tukang Kayu x Rp. - Rp. -
0.0300 Kepala Tukang x Rp. - Rp. -
0.2000 Pekerja x Rp. - Rp. -
0.0100 Mandor x Rp. - Rp. -
Jumlah Rp. -
SNI 3434:2008
Memasang 1 m2 rangka rangka atap genteng keramik, kayu klas II
0.0140 M3 Kaso-kaso (5x7) cm x Rp. - Rp. -
0.0036 M3 Reng (2x3) cm x Rp. - Rp. -
0.2500 Kg Paku x Rp. - Rp. -
0.1000 Tukang Kayu x Rp. - Rp. -
0.0100 Kepala Tukang x Rp. - Rp. -
0.1000 Pekerja x Rp. - Rp. -
0.0050 Mandor x Rp. - Rp. -
Jumlah Rp. -
- hal. 17 -
SNI 3434:2008
Memasang 1 m2 rangka rangka atap gentengbeton, kayu klas II
0.0140 M3 Kaso-kaso (5x7) cm x Rp. - Rp. -
0.0072 M3 Reng (2x3) cm x Rp. - Rp. -
0.2500 Kg Paku x Rp. - Rp. -
0.1000 Tukang Kayu x Rp. - Rp. -
0.0100 Kepala Tukang x Rp. - Rp. -
0.1000 Pekerja x Rp. - Rp. -
0.0050 Mandor x Rp. - Rp. -
Jumlah Rp. -
SNI 3434:2008
Memasang 1 m2 rangka rangka atap sirap, kayu klas II
0.1650 M3 Kayu klas II x Rp. - Rp. -
0.2000 Kg Paku 5 ~ 10 CM x Rp. - Rp. -
0.1200 Tukang Kayu x Rp. - Rp. -
0.0120 Kepala Tukang x Rp. - Rp. -
0.1200 Pekerja x Rp. - Rp. -
0.0060 Mandor x Rp. - Rp. -
Jumlah Rp. -
1 m2 Residu
1.0000 Kg Cat Residu x Rp. - Rp. -
0.1000 Pekerja x Rp. - Rp. -
0.0050 Mandor x Rp. - Rp. -
Jumlah Rp. -
SNI 3434:2008
Memasang 1 m2 rangka dinding pemisah (60 x 120) cm kayu klas II
0.0280 M3 Balok Kayu x Rp. - Rp. -
0.1500 Kg Paku x Rp. - Rp. -
0.4500 Tukang Kayu x Rp. - Rp. -
0.0450 Kepala Tukang x Rp. - Rp. -
0.1500 Pekerja x Rp. - Rp. -
0.0080 Mandor x Rp. - Rp. -
Jumlah Rp. -
SNI 7393:2008
memasang 1 m2 jendela nako & trails
1.1000 M2 Kaca 5 mm+ rangka x Rp. - Rp. -
10.0000 Daun paku skrup x Rp. - Rp. -
7.0000 Besi strip x Rp. - -
0.2000 Tukang Kayu x Rp. - Rp. -
0.0200 Kepala Tukang x Rp. - Rp. -
0.2000 Pekerja x Rp. - Rp. -
0.0010 Mandor x Rp. - Rp. -
Jumlah Rp. -
SNI 3434:2008
Memasang 1 m2 dinding pemisah Plywood rangkap, rangka kayu klas II
0.0280 Lbr balok kayu (6x12)cm x Rp. - Rp. -
0.1500 kg Paku 5 cm dan 10 cm x Rp. - Rp. -
0.8600 lbr Teakwood tebal 4 mm (120x240) x Rp. - Rp. -
0.5600 Kg Lem Kayu x Rp. 20,000.00 Rp. 11,200.00
0.6000 Tukang Kayu x Rp. - Rp. -
0.0600 Kepala Tukang x Rp. - Rp. -
0.2000 Pekerja x Rp. - Rp. -
0.0100 Mandor x Rp. - Rp. -
Jumlah Rp. 11,200.00
- hal. 18 -
SNI 3434:2008
Memasang 1 m2 dinding lambriziring dari papan klas I
0.0070 Lbr Papan kayu x Rp. - Rp. -
0.1000 kg Paku 5 cm dan 10 cm x Rp. - Rp. -
0.1500 lbr Paku Skrup 10 cm x Rp. - Rp. -
1.8000 Tukang Kayu x Rp. - Rp. -
0.1800 Kepala Tukang x Rp. - Rp. -
0.6000 Pekerja x Rp. - Rp. -
0.0300 Mandor x Rp. - Rp. -
Jumlah Rp. -
SNI 2839:2008
Memasang 1 m2 langit-langit gypsum board ukuran (1200x2400x9) m
0.3640 Lbr Gypsum board x Rp. - Rp. -
0.1100 Kg Paku Skrup x Rp. - Rp. -
0.0500 Tukang Kayu x Rp. - Rp. -
0.0050 Kepala Tukang x Rp. - Rp. -
0.1000 Pekerja x Rp. - Rp. -
0.0050 Mandor x Rp. - Rp. -
Jumlah Rp. -
SNI 2839:2008
Memasang 1 m2 langit-langit lambriziring kayu , tebal 9 mm
0.0150 Lbr Kayu papan x Rp. - Rp. -
0.0100 Kg paku tripleks x Rp. - Rp. -
0.8000 Tukang Kayu x Rp. - Rp. -
0.0800 Kepala Tukang x Rp. - Rp. -
0.8000 Pekerja x Rp. - Rp. -
0.0400 Mandor x Rp. - Rp. -
Jumlah Rp. -
SNI 2839:2008
Memasang 1 m2 langit2 tripleks ukuran (120x240) cm , tebal 3 mm , 4 mm
0.3750 Lbr Tripleks 3 mm x Rp. - Rp. -
0.0300 Kg Paku tripleks x Rp. - Rp. -
0.1000 Tukang Kayu x Rp. - Rp. -
0.0100 Kepala Tukang x Rp. - Rp. -
0.1000 Pekerja x Rp. - Rp. -
0.0050 Mandor x Rp. - Rp. -
Jumlah Rp. -
- hal. 19 -
1 m2 Cat Meni
0.3000 Kg Cat Meni x Rp. - Rp. -
0.0250 Pekerja x Rp. - Rp. -
0.0013 Mandor x Rp. - Rp. -
Jumlah Rp. -
- hal. 20 -
1 buah mesin gilas Per Bulan
30.0000 Masinis x Rp. - Rp. -
30.0000 Penjaga Malam x Rp. - Rp. -
500.0000 ltr Solar x Rp. - Rp. -
20.0000 ltr Oli x Rp. - Rp. -
5.0000 ltr Gemuk (Greese) x Rp. - Rp. -
30.0000 Pekerja x Rp. - Rp. -
30.0000 Sewa Mesin Gilas x Rp. - Rp. -
Jumlah Rp. -
- hal. 21 -
1 m2 Perbaikan Jalan Kembali
0.1800 m3 Lapis Lime Stone/batu kali x Rp. - Rp. -
1.0000 m2 Lapisan Batu Pecah 5/7 cm (T.7 x Rp. - Rp. -
1.0000 m2 Lapisan Aspal 2,5 kg x Rp. - Rp. -
1.0000 m2 Pengaspalan Sirtu (Sirtu T.5cm) x Rp. 0.07 Rp. 0.07
Jumlah Rp. 0.07
- hal. 22 -
Pemasangan Pipa PVC Ø100 mm
3.2000 m3 Galian Tanah x Rp. - Rp. -
1.2000 m3 Urugan Tanah dan Pemadatan x Rp. - Rp. -
1.0000 btg Penurunan dan Penyetelan Pipa x Rp. - Rp. -
1.1530 m3 Pembuangan sisa Tanah x Rp. - Rp. -
Jumlah 6 m' Rp. -
Jumlah 1 m' Rp. -
- hal. 23 -
PEMASANGAN TEE / DOP
PEKERJAAN PENGELASAN
1 m' Penyambungan Flange Las
2.0000 kg Kawat Las x Rp. - Rp. -
0.7500 Tukang Las x Rp. - Rp. -
0.0800 Kepala Tukang x Rp. - Rp. -
1.0000 Pekerja x Rp. - Rp. -
1.0000 ls Alat Bantu dll x Rp. 1,250.00 Rp. 1,250.00
Jumlah Rp. 1,250.00
PENYETELAN / PEMASANGAN FLANGE LAS , BEND STEEL , ALL FLANGE dan Sejenisnya
- hal. 24 -
Pemasangan Tee / Dop , Clem Sadel Dia. 4" dan DN < 4"
0.0900 m2 Bekesting x Rp. - Rp. -
0.0560 m3 Beton 1:3:5 x Rp. 20,000.00 Rp. 1,120.00
1.0000 m' Penyetelan pipa dia 100 mm x Rp. - Rp. -
Jumlah Rp. 1,120.00
Pemasangan Reduser /Double Neple & TS Valve Dia. 4" dan DN < 4"
0.1600 m2 Bekesting x Rp. - Rp. -
0.0770 m3 Beton 1:3:5 x Rp. 20,000.00 Rp. 1,540.00
1.0000 m' Penyetelan pipa dia 100 mm x Rp. - Rp. -
Jumlah Rp. 1,540.00
Pemasangan Bend /Ts Elbow der.90 Dia. 4" dan DN < 4"
0.1500 m2 Bekesting x Rp. - Rp. -
0.0560 m3 Beton 1:3:5 x Rp. 20,000.00 Rp. 1,120.00
1.0000 m' Penyetelan pipa dia 100 mm x Rp. - Rp. -
Jumlah Rp. 1,120.00
Pemasangan Bend /Ts Elbow der.45 / 22 / 11,25 Dia. 4" dan DN < 4"
0.1500 m2 Bekesting x Rp. - Rp. -
0.0320 m3 Beton 1:3:5 x Rp. 20,000.00 Rp. 640.00
1.0000 m' Penyetelan pipa dia 100 mm x Rp. - Rp. -
Jumlah Rp. 640.00
0
KEPALA DINAS PEKERJAAN UMUM
KABUPATEN GOWA
- hal. 25 -
RENCANA PEMBELIAN LANGSUNG (Survey Perbandingan Harga)
1 Paket Material 1 - Semen Portland 237.00 Zak 60,000 14,220,000 Semen Portland 50 kg
(Bahan/Material Toko) - Besi Ø 16 mm - Batang 160,000 - SNI 12 M Polos
- Besi Ø 14 mm 90.00 Batang 125,000 11,250,000 SNI 12 M Polos
- Besi Ø 12 mm 65.00 Batang 87,000 5,655,000 SNI 12 M Polos
- Besi Ø 10 mm 50.00 Batang 59,000 2,950,000 SNI 12 M Polos
- Besi Ø 8 mm 59.00 Batang 38,000 2,242,000 SNI 12 M Polos
- Besi Ø 6 mm 6.00 Batang 25,000 150,000 SNI 12 M Polos
- Kawat Beton 40.00 Kg 20,000 800,000
- Paku Biasa 31.00 Kg 15,000 465,000
- Cat Tembok 100.00 Kg 65,000 6,500,000 Anti Lumut
- Cat Besi 7.00 Kg 57,000 399,000
- Cat Meni Besi 3.00 Kg 45,000 135,000
- Kunci Tanam 1.00 Bh 125,000 125,000
- Engsel Kupu-Kupu 3.00 Bh 15,000 45,000
- Plamur 28.00 Kg 5,000 140,000
- Tripleks 9 mm 24.00 Lbr 98,000 2,352,000
- Gerobak Dorong 1.00 Bh 470,000 470,000
- Sekop 4.00 Bh 50,000 200,000
- Gergaji Besi 1.00 Bh 50,000 50,000
- Mata Gergaji 5.00 Bh 10,000 50,000
- Ember Cor 24.00 Bh 10,000 240,000
- Kuas Cat Besar 4.00 Bh 12,000 48,000
- Kuas Cat Kecil 3.00 Bh 4,000 12,000
- Terpal/Tenda Kerja 1.00 Bh 250,000 250,000
3 Paket Material Lokal - Balok Kayu 5/7 (Kayu Perancah/Mal) 82.00 Btg 42,000 3,444,000
(Bahan/Material Kayu) - Papan Kayu 2/25 (Kayu Perancah/Mal) 13.00 Lbr 60,000 780,000
- Kusen Pintu 1.00 Bh 400,000 400,000
- Daun Pintu 1.00 Bh 700,000 700,000
- Kusen Jendela - Bh 200,000 -
- Bambu 86.00 Btg 25,000 2,150,000
4 Paket Upah - Pekerja 253.87 Hok 86,000 21,832,820 Survey Perbandingan Harga
- Tukang 93.00 Hok 101,000 9,393,000
Jumlah 4.) 31,225,820
Harga Satuan
NO. PAKET PEKERJAAN URAIAN Volume Satuan Jumlah Biaya (Rp.) Speksifikasi
(Rp.)
Assesoris Pipa PVC SNI
- Sock Drat Luar PVC Ø 3" 1.00 Buah 85,000.00 85,000
- Sock Drat Luar PVC Ø 2" 1.00 Buah 38,000.00 38,000
- Sock Drat Luar PVC Ø 1 1/2" 3.00 Buah 15,000.00 45,000
- Sock Drat Dalam PVC Ø 3" - Buah 85,000.00 -
- Sock Drat Dalam PVC Ø 2" - Buah 38,000.00 -
- Sock Drat Dalam PVC Ø 1 1/2" - Buah 15,000.00 -
- Reducer PVC Ø 3" x Ø 2" 1.00 Buah 40,000.00 40,000
- Reducer PVC Ø 2" x Ø 1 1/2" 2.00 Buah 30,000.00 60,000
- Tee PVC Ø 3" x 3" x 3" 1.00 Buah 100,000.00 100,000
- Tee PVC Ø 2" x 3" x 2" 1.00 Buah 140,000.00 140,000
- Tee PVC Ø 2" x 2" x 2" 6.00 Buah 50,000.00 300,000
- Gate Valve 3" 2.00 Buah 300,000.00 600,000
- Dop PVC Ø 2" 4.00 Buah 25,000.00 100,000
- Dop PVC Ø 1 1/2" 2.00 Buah 12,000.00 24,000
- Knee 90 PVC Ø 3" 2.00 Buah 104,000.00 208,000
- Knee 90 PVC Ø 2" 2.00 Buah 32,000.00 64,000
- Knee 90 PVC Ø 1 1/2" 1.00 Buah 17,500.00 17,500
- Lem Pipa (Solvent Cement PVC) @ 400 gr 10.00 Buah 50,000.00 500,000
- Meteran Air 1.00 Buah 140,000.00 140,000
- Biaya Mobilisasi Pipa dan Aksesoris 1.00 Paket 1,885,000.00 1,885,000
6 Paket Pengelasan - Penutup Man Hole 80 x 80 (Besi Plat) 1.00 Ls 900,000 900,000 Pemilihan Langsung
- Penutup Box Valve 60 x 60 (Besi Plat) 1.00 Ls 750,000 750,000
- Tangga Pipa GIP Ø 1/2" 1.00 Ls 2,000,000 2,000,000
- Pipa Vent Gip Ø 2" 1.00 Ls 250,000 250,000
8 Paket Pengadaan Pompa Submersible Pump (SP) 1.00 Paket 45,000,000 45,000,000 Pemilihan Langsung
Tosora, 201
: Alelebbae
: Sarana Air Minum dan Sanitasi
Waktu Pengadaan
Waktu Pengadaan
0
Waktu Pengadaan
Tosora, 2019
( SIRAJUDDIN )
ANALISA HARGA SATUAN PEKERJAAN (AHSP)
BIDANG CIPTA KARYA
Pemasangan 1 m3 pondasi siklop, 60% beton campuran 1SP:2PB:3KR dan 40% batu belah
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 3.400 100,000 340,000
Tukang batu L.02 OH 0.850 120,000 102,000
Kepala Tukang L.03 OH 0.085 -
Mandor L.04 OH 0.170 -
JUMLAH TENAGA KERJA 442,000
B BAHAN
Batu belah m3 0.480 395,000 189,600
Semen portland Kg 194.000 1,340 259,960
Pasir beton m3 0.312 306,000 95,472
Kerikil m3 0.468 505,000 236,340
Besi beton Kg 126.000 15,823 1,993,671
Kawat beton Kg 1.800 23,000 41,400
JUMLAH HARGA BAHAN 2,816,443
C PERALATAN
CATATAN
Bobot isi pasir + 1.400 kg/m3, Bobot isi kerikil = 1.350 kg/m3, Bucking factor pasir = 20 %
Membuat 1 m3 lantai kerja beton mutu f' = 7,4 Mpa (K 100), slump (3-6) cm, w/c = 0,87
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.200 100,000 120,000
Tukang batu L.02 OH 0.200 120,000 24,000
Kepala Tukang L.03 OH 0.020 -
Mandor L.04 OH 0.060 -
JUMLAH TENAGA KERJA 144,000
B BAHAN
Semen portland Kg 230.000 1,340 308,200
Pasir beton m3 0.638 306,000 195,184
Batu pecah 2-3 m3 0.761 591,000 449,598
Air Ltr 200 -
JUMLAH HARGA BAHAN 952,982
C PERALATAN
Membuat 1 m3 beton mutu f' = 14,5 Mpa (K 175), slump (12 ±2) cm, w/c = 0,65
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 100,000 165,000
Tukang batu L.02 OH 0.275 120,000 33,000
Kepala Tukang L.03 OH 0.028 -
Mandor L.04 OH 0.083 -
JUMLAH TENAGA KERJA 198,000
B BAHAN
Semen portland Kg 326.000 1,340 436,840
Pasir beton m3 0.543 306,000 166,114
Batu pecah 2-3 m3 0.762 591,000 450,473
Air Ltr 215 -
JUMLAH HARGA BAHAN 1,053,428
C PERALATAN
Membuat 1 m3 beton mutu f' = 16,9 Mpa (K 200), slump (12 ±2) cm, w/c = 0,61
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 100,000 165,000
Tukang batu L.02 OH 0.275 120,000 33,000
Kepala Tukang L.03 OH 0.028 -
Mandor L.04 OH 0.083 -
JUMLAH TENAGA KERJA 198,000
B BAHAN
Semen portland Kg 352.000 1,340 471,680
Pasir beton m3 0.522 306,000 159,776
Batu pecah 2-3 m3 0.764 591,000 451,349
Air Ltr 215 -
JUMLAH HARGA BAHAN 1,082,805
C PERALATAN
Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1SP:2PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.300 100,000 30,000
Tukang batu L.02 OH 0.100 120,000 12,000
Kepala tukang L.03 OH 0.0100 -
Mandor L.04 OH 0.0150 -
JUMLAH TENAGA KERJA 42,000
B BAHAN
Bata merah bh 70.000 1,000 70,000
Semen portland kg 18.950 1,340 25,393
Pasir pasang m3 0.0380 242,000 9,196
JUMLAH HARGA BAHAN 104,589
C PERALATAN
Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1SP:3PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.300 100,000 30,000
Tukang batu L.02 OH 0.100 120,000 12,000
Kepala tukang L.03 OH 0.0100 -
Mandor L.04 OH 0.0150 -
JUMLAH TENAGA KERJA 42,000
B BAHAN
Bata merah bh 70.000 1,000 70,000
Semen portland kg 14.370 1,340 19,256
Pasir pasang m3 0.0400 242,000 9,680
JUMLAH HARGA BAHAN 98,936
C PERALATAN
Pemasangan 1 m2 acian
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.200 100,000 20,000
Tukang batu L.02 OH 0.100 120,000 12,000
Kepala tukang L.03 OH 0.0100 -
Mandor L.04 OH 0.0100 -
JUMLAH TENAGA KERJA 32,000
B BAHAN
Semen portland kg 3.250 1,340 4,355
JUMLAH HARGA BAHAN 4,355
C PERALATAN
Pemasangan 1 m2 langit-langit tripleks ukuran (120x240)cm, tebal 3mm, 4mm, & 6mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.100 100,000 10,000
Tukang kayu L.02 OH 0.100 120,000 12,000
Kepala tukang L.03 OH 0.0100 -
Mandor L.04 OH 0.0050 -
JUMLAH TENAGA KERJA 22,000
B BAHAN
Tripleks Lbr 0.375 80,000 30,000
Paku tripleks kg 0.030 22,000 660
JUMLAH HARGA BAHAN 30,660
C PERALATAN
Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas I
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 7.000 100,000 700,000
Tukang kayu L.02 OH 21.000 120,000 2,520,000
Kepala tukang L.03 OH 2.1000 -
Mandor L.04 OH 0.3500 -
JUMLAH TENAGA KERJA 3,220,000
B BAHAN
Balok kayu m3 1.100 2,800,000 3,080,000
Paku 10cm kg 1.250 22,000 27,500
Lem kayu kg 1.000 15,000 15,000
JUMLAH HARGA BAHAN 3,122,500
C PERALATAN
Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II dan III
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 6.000 100,000 600,000
Tukang kayu L.02 OH 18.000 120,000 2,160,000
Kepala tukang L.03 OH 1.8000 -
Mandor L.04 OH 0.3000 -
JUMLAH TENAGA KERJA 2,760,000
B BAHAN
Balok kayu m3 1.200 2,800,000 3,360,000
Paku 10cm kg 1.250 22,000 27,500
Lem kayu kg 1.000 15,000 15,000
JUMLAH HARGA BAHAN 3,402,500
C PERALATAN
Pengecatan 1 m2 tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.020 100,000 2,000
Tukang cat L.02 OH 0.063 120,000 7,560
Kepala tukang L.03 OH 0.0063 -
Mandor L.04 OH 0.0030 -
JUMLAH TENAGA KERJA 9,560
B BAHAN
Plamuur kg 0.1000 9,000 900
Cat dasar kg 0.1000 105,000 10,500
Cat penutup kg 0.2600 105,000 27,300
JUMLAH HARGA BAHAN 38,700
C PERALATAN
D Jumlah (A+B+C)
D Jumlah (A+B+C) -
D Jumlah (A+B+C) -
Pengetesan 1 m pipa φ 50 mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.008 100,000 800
Mandor L.04 OH 0.0008 -
JUMLAH TENAGA KERJA 800
B BAHAN
Air test (air bersih) m3 0.002 -
Bahan bakar ltr 0.06 -
Oli ltr 0.002 -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT
Pengetesan 1 m pipa φ 75 mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.008 100,000 800
Mandor L.04 OH 0.0008 -
JUMLAH TENAGA KERJA 800
B BAHAN
Air test (air bersih) m3 0.004 -
Bahan bakar ltr 0.06 -
Oli ltr 0.002 -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) -
Pengetesan 1 m pipa φ 400 mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.008 100,000 800
Mandor L.04 OH 0.0008 -
JUMLAH TENAGA KERJA 800
B BAHAN
Air test (air bersih) m3 0.126 -
Bahan bakar ltr 0.06 -
Oli ltr 0.002 -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT
PROGRAM : PAMSIMAS
PEKERJAAN : SARANA AIR MINUM DAN SANITASI
LOKASI : DESA PALIPPU/ KEC. TANASITOLO
TAHUN ANGGARAN : 2019
SNI 03-2835:1992
ANALISA BIAYA KONSTRUKSI PEKERJAAN PERSIAPAN
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.100 100,000.00 10,000.00
2. Tukang Kayu Hari/Orang - 120,000.00 -
3. Kepala Tukang Hari/Orang - -
4. Mandor Hari/Orang 0.050 -
JUMLAH 10,000.00
JUMLAH 10,000.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.100 100,000.00 10,000.00
2. Tukang Kayu Hari/Orang 0.100 120,000.00 12,000.00
3. Kepala Tukang Hari/Orang 0.010 -
4. Mandor Hari/Orang 0.005 -
JUMLAH 22,000.00
B. BAHAN
1. Kayu Klas III uk. 5/7 m3 0.012 2,800,000.00 33,600.00
2. Paku biasa 2" - 5" Kg 0.020 22,000.00 440.00
3. Kayu papan 3/20 m3 0.007 2,800,000.00 19,600.00
JUMLAH 53,640.00
JUMLAH A + B 75,640.00
SNI 2835:2008
ANALISA BIAYA KONSTRUKSI PEKERJAAN TANAH
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.750 100,000.00 75,000.00
2. Tukang Gali Hari/Orang - 120,000.00 -
3. Kepala Tukang Hari/Orang - - -
4. Mandor Hari/Orang 0.025 - -
JUMLAH A 75,000.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.900 100,000.00 90,000.00
2. Tukang Gali Hari/Orang - 120,000.00 -
3. Kepala Tukang Hari/Orang - - -
4. Mandor Hari/Orang 0.045 - -
JUMLAH A 90,000.00
A. TENAGA KERJA
Analisa_137 - 358
A. TENAGA KERJA
1. Pekerja Hari/Orang 1.000 100,000.00 100,000.00
2. Tukang Gali Hari/Orang - 120,000.00 -
3. Kepala Tukang Hari/Orang - -
4. Mandor Hari/Orang 0.032 -
JUMLAH A 100,000.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 1.500 100,000.00 150,000.00
2. Tukang Gali Hari/Orang - 120,000.00 -
3. Kepala Tukang Hari/Orang - - -
4. Mandor Hari/Orang 0.060 - -
JUMLAH A 150,000.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 1.200 100,000.00 120,000.00
2. Tukang Gali Hari/Orang - 120,000.00 -
3. Kepala Tukang Hari/Orang - -
4. Mandor Hari/Orang 0.045 -
JUMLAH A 120,000.00
Mengurug kembali 1 m3 galian dihitung dari 1/3 dari indeks pekerjaan galian
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.500 100,000.00 50,000.00
2. Tukang Gali Hari/Orang - 120,000.00 -
3. Kepala Tukang Hari/Orang - -
4. Mandor Hari/Orang 0.050 -
JUMLAH A 50,000.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.300 100,000.00 30,000.00
2. Tukang Gali Hari/Orang - 120,000.00 -
3. Kepala Tukang Hari/Orang - -
4. Mandor Hari/Orang 0.010 -
JUMLAH A 30,000.00
B. BAHAN
1. Pasir urug m3 1.200 242,000.00 290,400.00
JUMLAH 290,400.00
JUMLAH A + B 320,400.00
Analisa_139 - 358
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.150 100,000.00 15,000.00
2. Tukang Gali Hari/Orang - - -
3. Kepala Tukang Hari/Orang - -
4. Mandor Hari/Orang 0.015 -
JUMLAH A 15,000.00
B. BAHAN
1. Ijuk m3 6.000 35,000.00 210,000.00
JUMLAH 210,000.00
JUMLAH A + B 225,000.00
sirtu padat untuk peninggian lantai bangunan
6.15
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.250 100,000.00 25,000.00
2. Tukang Gali Hari/Orang - 120,000.00 -
3. Kepala Tukang Hari/Orang - -
4. Mandor Hari/Orang 0.025 - -
JUMLAH A 25,000.00
B. BAHAN
1. Sirtu m3 1.200 242,000.00 290,400.00
JUMLAH 290,400.00
JUMLAH A + B 315,400.00
SNI 2836:2008
ANALISA BIAYA KONSTRUKSI PEKERJAAN PONDASI
A. TENAGA KERJA
1. Pekerja Hari/Orang 1.500 100,000.00 150,000.00
2. Tukang Batu Hari/Orang 0.750 120,000.00 90,000.00
3. Kepala Tukang Hari/Orang 0.075 -
4. Mandor Hari/Orang 0.075 -
JUMLAH 240,000.00
B. BAHAN
1. Batu belah 15/20 cm m3 1.200 395,000.00 474,000.00
2. Semen Portland kg 202.000 1,340.00 270,680.00
3. Pasir pasang m3 0.485 242,000.00 117,370.00
JUMLAH 862,050.00
JUMLAH A + B 1,102,050.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 1.500 100,000.00 150,000.00
2. Tukang Batu Hari/Orang 0.750 120,000.00 90,000.00
3. Kepala Tukang Hari/Orang 0.075 -
4. Mandor Hari/Orang 0.075 -
JUMLAH 240,000.00
B. BAHAN
Analisa_140 - 358
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.780 100,000.00 78,000.00
2. Tukang Batu Hari/Orang 0.390 120,000.00 46,800.00
3. Kepala Tukang Hari/Orang 0.039 -
4. Mandor Hari/Orang 0.039 -
JUMLAH 124,800.00
B. BAHAN
1. Batu belah 15/20 cm m3 1.200 395,000.00 474,000.00
2. Pasir urug m3 0.432 242,000.00 104,544.00
JUMLAH 578,544.00
JUMLAH A + B 703,344.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 2.400 100,000.00 240,000.00
2. Tukang Batu Hari/Orang 0.800 120,000.00 96,000.00
3. Kepala Tukang Hari/Orang 0.080 -
4. Mandor Hari/Orang 0.119 -
JUMLAH 336,000.00
B. BAHAN
1. Batu belah 15/20 cm m3 0.450 395,000.00 177,750.00
1. Semen Portland m4 194.000 1,340.00 259,960.00
2. Pasir beton m3 0.312 306,000.00 95,472.00
2. Kerikil (maksimum 40 mm) m3 0.468 505,000.00 236,340.00
JUMLAH 769,522.00
JUMLAH A + B 1,105,522.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 3.000 100,000.00 300,000.00
2. Tukang Hari/Orang 0.050 120,000.00 6,000.00
JUMLAH 306,000.00
B. BAHAN
1. Kawat Beronjong Buah 1.000 420,000.00 420,000.00
1. Batu Kali 10/20 cm m³ 1.200 395,000.00 474,000.00
JUMLAH 894,000.00
JUMLAH A + B 1,200,000.00
SNI 7394:2008
ANALISA BIAYA KONSTRUKSI PEKERJAAN BETON
6.4 Membuat 1 m³ lantai kerja beton mutu f'c = 7,4 Mpa (K 100), slump (3-6) cm, w/c = 0,87
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )
A. TENAGA KERJA
1. Pekerja Hari/Orang 1.650 100,000.00 165,000.00
2. Tukang Batu Hari/Orang 0.275 120,000.00 33,000.00
3. Kepala Tukang Hari/Orang 0.028 -
4. Mandor Hari/Orang 0.083 -
Analisa_142 - 358
JUMLAH 198,000.00
B. BAHAN
1. Semen Portland kg 230.000 1,340.00 308,200.00
2. Pasir beton m³ 0.638 245,000.00 156,275.00
3. Batu Pecah 2-3 m³ 0.761 591,000.00 449,597.78
4. Air Liter 200.000 - -
JUMLAH 914,072.78
JUMLAH A + B 1,112,072.78
Analisa_143 - 358
6.5 Membuat 1 m³ beton mutu f'c = 14,5 Mpa (K 175), slump (12 ± 2) cm, w/c = 0,66
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )
A. TENAGA KERJA
1. Pekerja Hari/Orang 1.650 100,000.00 165,000.00
2. Tukang Batu Hari/Orang 0.275 120,000.00 33,000.00
3. Kepala Tukang Hari/Orang 0.028 -
4. Mandor Hari/Orang 0.083 -
JUMLAH 198,000.00
B. BAHAN
1. Semen Portland kg 326.000 1,340.00 436,840.00
2. Pasir beton m³ 0.543 245,000.00 133,000.00
3. Batu Pecah 2-3 m³ 0.762 591,000.00 450,473.33
4. Air Liter 215.000 - -
JUMLAH 1,020,313.33
JUMLAH A + B 1,218,313.33
6.6 Membuat 1 m3 beton mutu f'c =16,9 Mpa (K200) slump (12+-2) cm, w/c = 0,61
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )
A. TENAGA KERJA
1. Pekerja Hari/Orang 1.650 100,000.00 165,000.00
2. Tukang Batu Hari/Orang 0.275 120,000.00 33,000.00
3. Kepala Tukang Hari/Orang 0.280 -
4. Mandor Hari/Orang 0.083 -
JUMLAH 198,000.00
B. BAHAN
1. Semen Portland kg 352.000 1,340.00 471,680.00
2. Pasir beton m³ 0.522 245,000.00 127,925.00
3. Batu Pecah 2-3 m³ 0.764 591,000.00 451,348.89
4. Air Liter 215.000 - -
JUMLAH 1,050,953.89
JUMLAH A + B 1,248,953.89
6.7 Membuat 1 m3 beton mutu f'c =19,3 Mpa (K225) slump (12+-2) cm, w/c = 0,58
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )
A. TENAGA KERJA
1. Pekerja Hari/Orang 1.650 100,000.00 165,000.00
2. Tukang Batu Hari/Orang 0.275 120,000.00 33,000.00
3. Kepala Tukang Hari/Orang 0.280 -
4. Mandor Hari/Orang 0.083 -
JUMLAH 198,000.00
B. BAHAN
1. Semen Portland kg 371.000 1,340.00 497,140.00
2. Pasir beton m³ 0.499 245,000.00 122,150.00
3. Batu Pecah 2-3 m³ 0.776 591,000.00 458,353.33
4. Air Liter 215.000 - -
JUMLAH 1,077,643.33
JUMLAH A + B 1,275,643.33
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.070 100,000.00 7,000.00
2. Tukang Besi Hari/Orang 0.070 120,000.00 8,400.00
Analisa_144 - 358
B. BAHAN
1. Besi beton (polos/ulir) Kg 10.500 9,500.00 99,750.00
2. Kawat beton Kg 0.150 23,000.00 3,450.00
JUMLAH 103,200.00
JUMLAH A + B 118,600.00
Pembesian 1 Kg dengan besi polos atau ulir 11,860.00
Analisa_145 - 358
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.0070 100,000.00 700.00
2. Tukang Besi Hari/Orang 0.0070 120,000.00 840.00
3. Kepala Tukang Hari/Orang 0.0007 -
4. Mandor Hari/Orang 0.0004 -
JUMLAH 1,540.00
B. BAHAN
1. Besi beton (polos/ulir) Kg 1.050 9,500.00 9,975.00
2. Kawat beton Kg 0.015 23,000.00 345.00
JUMLAH 10,320.00
JUMLAH A + B 11,860.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.520 100,000.00 52,000.00
2. Tukang Kayu Hari/Orang 0.260 120,000.00 31,200.00
3. Kepala Tukang Hari/Orang 0.026 -
4. Mandor Hari/Orang 0.026 -
JUMLAH 83,200.00
B. BAHAN
1. Kayu kelas III m3 0.040 2,800,000.00 112,000.00
2. Paku 5 cm - 10 cm Kg 0.300 22,000.00 6,600.00
3. Minyak bekisting Ltr 0.100 - -
JUMLAH 118,600.00
JUMLAH A + B 201,800.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.520 100,000.00 52,000.00
2. Tukang Kayu Hari/Orang 0.260 120,000.00 31,200.00
3. Kepala Tukang Hari/Orang 0.026 - -
4. Mandor Hari/Orang 0.026 -
JUMLAH 83,200.00
B. BAHAN
1. Kayu kelas III m3 0.045 2,800,000.00 126,000.00
2. Paku 5 cm - 10 cm Kg 0.300 22,000.00 6,600.00
3. Minyak bekisting Ltr 0.100 - -
JUMLAH 132,600.00
JUMLAH A + B 215,800.00
Analisa_146 - 358
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.660 100,000.00 66,000.00
2. Tukang Kayu Hari/Orang 0.330 120,000.00 39,600.00
3. Kepala Tukang Hari/Orang 0.033 - -
4. Mandor Hari/Orang 0.033 - -
JUMLAH 105,600.00
B. BAHAN
1. Kayu Kelas III m3 0.040 2,800,000.00 112,000.00
2. Paku 5 cm - 12 cm Kg 0.400 22,000.00 8,800.00
3. Minyak bekisting Ltr 0.200 - -
4. Balok kayu Kls. II m3 0.015 2,800,000.00 42,000.00
5. Plywood tebal 9 mm Lmbr 0.350 110,000.00 38,500.00
6. bambu Btg 2.000 #NAME? #NAME?
JUMLAH #NAME?
JUMLAH A + B #NAME?
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.660 100,000.00 66,000.00
2. Tukang Kayu Hari/Orang 0.330 120,000.00 39,600.00
3. Kepala Tukang Hari/Orang 0.033 - -
4. Mandor Hari/Orang 0.033 - -
JUMLAH 105,600.00
B. BAHAN
1. Kayu Kelas III m3 0.040 2,800,000.00 112,000.00
2. Paku 5 cm - 12 cm Kg 0.400 22,000.00 8,800.00
3. Minyak bekisting Ltr 0.200 - -
4. Balok kayu Kls. II m3 0.018 2,800,000.00 50,400.00
5. Plywood tebal 9 mm Lmbr 0.350 110,000.00 38,500.00
6. Dolken kayu galam, Φ (8-10) cm, p = 4 m Btg 2.000 #NAME? #NAME?
JUMLAH #NAME?
JUMLAH A + B #NAME?
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.660 100,000.00 66,000.00
2. Tukang Kayu Hari/Orang 0.330 120,000.00 39,600.00
3. Kepala Tukang Hari/Orang 0.033 -
4. Mandor Hari/Orang 0.033 -
JUMLAH 105,600.00
B. BAHAN
1. Kayu kelas III m3 0.040 2,800,000.00 112,000.00
2. Paku 5 cm - 12 cm Kg 0.400 22,000.00 8,800.00
3. Minyak bekisting Ltr 0.200 - -
4. Balok kayu Kls. II m3 0.015 2,800,000.00 42,000.00
5. Plywood tebal 9 mm Lmbr 0.350 110,000.00 38,500.00
6. Dolken kayu galam, Φ (8-10) cm, p = 4 m Btg 6.000 #NAME? #NAME?
JUMLAH #NAME?
JUMLAH A + B #NAME?
Analisa_147 - 358
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.660 100,000.00 66,000.00
2. Tukang Kayu Hari/Orang 0.330 120,000.00 39,600.00
3. Kepala Tukang Hari/Orang 0.033 -
4. Mandor Hari/Orang 0.033 -
JUMLAH 105,600.00
B. BAHAN
1. Kayu kelas III m3 0.030 2,800,000.00 84,000.00
2. Paku 5 cm - 12 cm Kg 0.400 22,000.00 8,800.00
3. Minyak bekisting Ltr 0.200 - -
4. Balok kayu Kls. II m3 0.020 2,800,000.00 56,000.00
5. Plywood tebal 9 mm Lmbr 0.350 110,000.00 38,500.00
6. Dolken kayu galam, Φ (8-10) cm, p = 4 m Btg 3.000 #NAME? #NAME?
7. Formtie/penjaga jrk bekisting/spacer Buah 4.000 - -
JUMLAH #NAME?
JUMLAH A + B #NAME?
SNI 6897:2008
ANALISA BIAYA KONSTRUKSI PEKERJAAN DINDING
6.7 Memasang 1 m2 dinding bata merah, tebal 1/2 bata, campuran spesi 1 PC : 2 PP
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.300 100,000.00 30,000.00
2. Tukang Batu Hari/Orang 0.100 120,000.00 12,000.00
3. Kepala Tukang Hari/Orang 0.010 -
4. Mandor Hari/Orang 0.015 -
JUMLAH 42,000.00
B. BAHAN
1. Bata merah Bh 70.000 1,000.00 70,000.00
2. Semen Portland Kg 18.950 1,340.00 25,393.00
3. Pasir pasang m3 0.038 242,000.00 9,196.00
JUMLAH 104,589.00
JUMLAH A + B 146,589.00
6.8 Memasang 1 m2 dinding bata merah, tebal 1/2 bata, campuran spesi 1 PC : 3 PP
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.300 100,000.00 30,000.00
2. Tukang Batu Hari/Orang 0.100 120,000.00 12,000.00
3. Kepala Tukang Hari/Orang 0.010 -
4. Mandor Hari/Orang 0.015 -
JUMLAH 42,000.00
B. BAHAN
1. Bata merah 5 x 11 x 22 cm Bh 70.000 1,000.00 70,000.00
2. Semen Portland Kg 14.370 1,340.00 19,255.80
3. Pasir pasang m3 0.040 242,000.00 9,680.00
JUMLAH 98,935.80
JUMLAH A + B 140,935.80
6.9 Memasang 1 m2 dinding bata merah, tebal 1/2 bata, campuran spesi 1 PC : 4 PP
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )
Analisa_148 - 358
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.300 100,000.00 30,000.00
2. Tukang Batu Hari/Orang 0.100 120,000.00 12,000.00
3. Kepala Tukang Hari/Orang 0.010 -
4. Mandor Hari/Orang 0.015 -
JUMLAH 42,000.00
B. BAHAN
1. Bata merah 5 x 11 x 22 cm Bh 70.000 1,000.00 70,000.00
2. Semen Portland Kg 11.500 1,340.00 15,410.00
3. Pasir pasang m3 0.043 242,000.00 10,406.00
JUMLAH 95,816.00
JUMLAH A + B 137,816.00
Analisa_149 - 358
6.22 Memasang 1 m2 dinding terawang (roaster) ukuran (12 x 11 x 24) cm, campuran spesi 1 PC :4 PP
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.300 100,000.00 30,000.00
2. Tukang Batu Hari/Orang 0.100 120,000.00 12,000.00
3. Kepala Tukang Hari/Orang 0.010 - -
4. Mandor Hari/Orang 0.015 - -
JUMLAH 42,000.00
B. BAHAN
1. Roaster / terawang Bh 30.000 40,000.00 1,200,000.00
2. Semen Portland Kg 11.000 1,340.00 14,740.00
3. Pasir pasang m3 0.035 242,000.00 8,470.00
JUMLAH 1,223,210.00
JUMLAH A + B 1,265,210.00
SNI 2837:2008
ANALISA BIAYA KONSTRUKSI PEKERJAAN PLESTERAN
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.400 100,000.00 40,000.00
2. Tukang Batu Hari/Orang 0.200 120,000.00 24,000.00
3. Kepala Tukang Hari/Orang 0.020 -
4. Mandor Hari/Orang 0.022 -
JUMLAH 64,000.00
B. BAHAN
1. Semen Portland Kg 13.632 1,340.00 18,266.88
2. Pasir pasang m3 0.027 242,000.00 6,534.00
JUMLAH 24,800.88
JUMLAH A + B 88,800.88
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.400 100,000.00 40,000.00
2. Tukang Batu Hari/Orang 0.200 120,000.00 24,000.00
3. Kepala Tukang Hari/Orang 0.020 -
4. Mandor Hari/Orang 0.022 -
JUMLAH 64,000.00
B. BAHAN
1. Semen Portland Kg 8.320 1,340.00 11,148.80
2. Pasir pasang m3 0.032 242,000.00 7,744.00
JUMLAH 18,892.80
JUMLAH A + B 82,892.80
A. TENAGA KERJA
Pekerja Hari/Orang 0.200 100,000.00 20,000.00
Tukang Batu Hari/Orang 0.100 120,000.00 12,000.00
Kepala Tukang Batu Hari/Orang 0.010
Mandor Hari/Orang 0.010
Analisa_150 - 358
JUMLAH 32,000.00
B. BAHAN
Semen Portland Kg 3.250 1,340.00 4,355.00
JUMLAH 4,355.00
JUMLAH A + B 36,355.00
Analisa_151 - 358
SNI 2837:2008
ANALISA BIAYA KONSTRUKSI PEKERJAAN LANTAI
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.700 100,000.00 70,000.00
2. Tukang Batu Hari/Orang 0.350 120,000.00 42,000.00
3. Kepala Tukang Hari/Orang 0.035 -
4. Mandor Hari/Orang 0.035 -
JUMLAH 112,000.00
B. BAHAN
1. Ubin keramik 20 x 20 cm Buah 26.500 - -
2. Semen Portland Kg 10.400 1,340.00 13,936.00
3. Pasir pasang M3 0.045 242,000.00 10,890.00
4. Semen warna Kg 1.620 - -
JUMLAH 24,826.00
JUMLAH A + B 136,826.00
SNI 3434:2008
ANALISA BIAYA KONSTRUKSI PEKERJAAN KAYU
6.2 Membuat dan memasang 1 m3 kusen pintu dan kusen jendela, kayu kelas II atau III
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )
A. TENAGA KERJA
1. Pekerja Hari/Orang 6.000 100,000.00 600,000.00
2. Tukang Kayu Hari/Orang 18.000 120,000.00 2,160,000.00
3. Kepala Tukang Hari/Orang 2.000 -
4. Mandor Hari/Orang 0.300 -
JUMLAH 2,760,000.00
B. BAHAN
1. Kayu balok kelas II m3 1.200 3,682,000.00 4,418,400.00
JUMLAH 4,418,400.00
JUMLAH A + B 7,178,400.00
6.5 Membuat dan memasangn 1 m2 daun pintu panel, kayu kelas I atau II
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )
A. TENAGA KERJA
1. Pekerja Hari/Orang 1.000 100,000.00 100,000.00
2. Tukang Kayu Hari/Orang 3.000 120,000.00 360,000.00
3. Kepala Tukang Hari/Orang 0.300 -
4. Mandor Hari/Orang 0.050 -
JUMLAH 460,000.00
B. BAHAN
1. Papan Kayu m3 0.040 1,902,000.00 76,080.00
2. Lem Kayu Kg 0.500 75,000.00 37,500.00
JUMLAH 113,580.00
JUMLAH A + B 573,580.00
Analisa_152 - 358
6.12 Memasang 1 m2 teakwood rangkap lapis formika, rangka expose kayu kelas II
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.850 100,000.00 85,000.00
2. Tukang Kayu Hari/Orang 0.550 120,000.00 66,000.00
3. Kepala Tukang Hari/Orang 0.255 -
4. Mandor Hari/Orang 0.043 -
JUMLAH 151,000.00
B. BAHAN
1. Papan kayu m² 0.025 1,902,000.00 47,550.00
2. Paku 1 cm - 2,5 cm Kg 0.030 22,000.00 660.00
3. Lem kayu Kg 0.800 75,000.00 60,000.00
4. Teakwood tebal 4 mm ukuran (90 x 220) cm Lmbr 1.000 67,000.00 67,000.00
JUMLAH 175,210.00
JUMLAH A + B 326,210.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 4.000 100,000.00 400,000.00
2. Tukang Kayu Hari/Orang 12.000 120,000.00 1,440,000.00
3. Kepala Tukang Hari/Orang 1.200 -
4. Mandor Hari/Orang 0.200 -
JUMLAH 1,840,000.00
B. BAHAN
1. Kayu balok kelas II m3 1.100 2,800,000.00 3,080,000.00
2. Besi strip tebal 5 mm Kg 15.000 10,000.00 150,000.00
3. Paku 12 cm Kg 5.600 22,000.00 123,200.00
JUMLAH 3,353,200.00
JUMLAH A + B 5,193,200.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 2.400 100,000.00 240,000.00
2. Tukang Kayu Hari/Orang 7.200 120,000.00 864,000.00
3. Kepala Tukang Hari/Orang 0.720 -
4. Mandor Hari/Orang 0.120 -
JUMLAH 1,104,000.00
B. BAHAN
1. Balok kayu m3 1.100 2,800,000.00 3,080,000.00
2. Besi strip tebal 5 mm Kg 15.000 10,000.00 150,000.00
3. Paku 12 cm Kg 3.000 22,000.00 66,000.00
JUMLAH 3,296,000.00
JUMLAH A + B 4,400,000.00
6.20 Memasang 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II atau III
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.200 100,000.00 20,000.00
2. Tukang Kayu Hari/Orang 0.300 120,000.00 36,000.00
3. Kepala Tukang Hari/Orang 0.030 -
4. Mandor Hari/Orang 0.010 -
JUMLAH 56,000.00
Analisa_153 - 358
B. BAHAN
1. Kaso-kaso (5 x 7) cm m3 0.016 2,800,000.00 45,640.00
2. Paku 7 cm - 10 cm Kg 0.250 22,000.00 5,500.00
JUMLAH 51,140.00
JUMLAH A + B 107,140.00
Analisa_154 - 358
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.100 100,000.00 10,000.00
2. Tukang Kayu Hari/Orang 0.200 120,000.00 24,000.00
3. Kepala Tukang Hari/Orang 0.020 -
4. Mandor Hari/Orang 0.005 -
JUMLAH 34,000.00
B. BAHAN
1. Papan kayu m3 0.0108 1,902,000.00 20,541.60
2. Paku 7 cm - 10 cm Kg 0.100 22,000.00 2,200.00
JUMLAH 22,741.60
JUMLAH A + B 56,741.60
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.015 100,000.00 1,500.00
2. Tukang Kayu Hari/Orang 0.150 120,000.00 18,000.00
3. Kepala Tukang Hari/Orang 0.015 -
4. Mandor Hari/Orang 0.001 -
JUMLAH 19,500.00
B. BAHAN
1. Engsel pintu Buah 1.000 39,000.00 39,000.00
JUMLAH 39,000.00
JUMLAH A + B 58,500.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.010 100,000.00 1,000.00
2. Tukang Kayu Hari/Orang 0.100 120,000.00 12,000.00
3. Kepala Tukang Hari/Orang 0.010 -
4. Mandor Hari/Orang 0.001 -
JUMLAH 13,000.00
B. BAHAN
1. Engsel jendela Buah 1.000 39,000.00 39,000.00
JUMLAH 39,000.00
JUMLAH A + B 52,000.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.010 100,000.00 1,000.00
2. Tukang Kayu Hari/Orang 0.500 120,000.00 60,000.00
3. Kepala Tukang Hari/Orang 0.010 -
4. Mandor Hari/Orang 0.005 -
JUMLAH 61,000.00
B. BAHAN
1. Kunci Pintu Buah 1.000 223,000.00 223,000.00
JUMLAH 223,000.00
JUMLAH A + B 284,000.00
Analisa_155 - 358
RSNI T-12-2002
ANALISA BIAYA KONSTRUKSI PEKERJAAN SANITASI
A. TENAGA KERJA
1. Tukang Hari/Orang 1.050 100,000.00 105,000.00
2. Pekerja Hari/Orang 1.050 120,000.00 126,000.00
3. Kepala Tukang Hari/Orang 0.105 -
4. Mandor Hari/Orang 0.0052 -
JUMLAH 231,000.00
B. BAHAN
1. Pintu Fiber m² 1.000 400,000.00 400,000.00
JUMLAH 400,000.00
JUMLAH A + B 631,000.00
SNI DT-03-3436-2002
ANALISA BIAYA KONSTRUKSI PEKERJAAN PENUTUP ATAP
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.120 100,000.00 12,000.00
2. Tukang Kayu Hari/Orang 0.060 120,000.00 7,200.00
3. Kepala Tukang Hari/Orang 0.006 -
4. Mandor Hari/Orang 0.006 -
JUMLAH 19,200.00
B. BAHAN
1. Seng gelombang (180 x 90 cm) Lmbr 0.700 53,000.00 37,100.00
2. Paku seng Bh 0.020 22,000.00 440.00
JUMLAH 37,540.00
JUMLAH A + B 56,740.00
SNI 03-2842-2002
ANALISA BIAYA KONSTRUKSI PEKERJAAN PENGECATAN
6.14 1 m2 pengecatan tembok baru ( 1 Lapis Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup )
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.0200 100,000.00 2,000.00
2. Tukang Cat Hari/Orang 0.0630 120,000.00 7,560.00
3. Kepala Tukang Hari/Orang 0.0063 -
4. Mandor Hari/Orang 0.0025 -
JUMLAH 9,560.00
B. BAHAN
1. Plamir tembok Kg 0.100 9,000.00 900.00
2. Cat dasar Kg 0.100 105,000.00 10,500.00
3. Cat tembok mutu menengah Kg 0.260 105,000.00 27,300.00
JUMLAH 11,400.00
JUMLAH A + B 20,960.00
6.15 1 m2 pengecatan tembok Lama ( 1 Lapis Cat Dasar, 2 Lapis Cat Penutup )
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )
A. TENAGA KERJA
Analisa_156 - 358
B. BAHAN
1. Cat dasar Kg 0.100 105,000.00 10,500.00
2. Cat tembok mutu menengah Kg 0.180 105,000.00 18,900.00
JUMLAH 10,500.00
JUMLAH A + B 18,340.00
Analisa_157 - 358
6.8 1 m2 pengecatan bidang kayu baru ( 1 lapis plamur , 1 lapis cat dasar dan 2 lapis cat penutup)
NO. HARGA SATUAN BIAYA SATUAN
URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.070 100,000.00 7,000.00
2. Tukang Cat Hari/Orang 0.009 120,000.00 1,080.00
3. Kepala Tukang Hari/Orang 0.006 - -
4. Mandor Hari/Orang 0.003 -
JUMLAH 8,080.00
B. BAHAN
1. Meni kayu Kg 0.200 47,000.00 9,400.00
2. Plamir kayu Kg 0.150 9,000.00 1,350.00
3. Cat dasar kayu Kg 0.170 58,000.00 9,860.00
4. Cat kayu mutu menengah Kg 0.260 58,000.00 15,080.00
JUMLAH 15,080.00
JUMLAH A + B 23,160.00
SNI-T-15-2002
ANALISA BIAYA KONSTRUKSI PEKERJAAN SANITASI
A. TENAGA KERJA
1. Pekerja Hari/Orang 1.000 100,000.00 100,000.00
2. Tukang Batu Hari/Orang 1.500 120,000.00 180,000.00
3. Kepala Tukang Hari/Orang 0.150 -
4. Mandor Hari/Orang 0.160 -
JUMLAH 280,000.00
B. BAHAN
1. Kloset jongkok Buah 1.000 - -
2. Sement portland Kg 6.000 1,340.00 8,040.00
3. Pasir pasang M3 0.010 242,000.00 2,420.00
JUMLAH 10,460.00
JUMLAH A + B 290,460.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.054 100,000.00 5,400.00
2. Tukang Hari/Orang 0.090 120,000.00 10,800.00
3. Kepala Tukang Hari/Orang 0.009 -
4. Mandor Hari/Orang 0.003 -
JUMLAH 16,200.00
B. BAHAN
1. Pipa Galvanis M' 1.200 - -
2. Perlengkapan 35 % harga pipa Ls 0.35 - -
JUMLAH -
JUMLAH A + B 16,200.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.054 100,000.00 5,400.00
2. Tukang Hari/Orang 0.090 120,000.00 10,800.00
Analisa_158 - 358
B. BAHAN
1. Pipa Galvanis M' 1.200 - -
2. Perlengkapan 35 % harga pipa Ls 0.35 - -
JUMLAH -
JUMLAH A + B 16,200.00
Analisa_159 - 358
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.054 100,000.00 5,400.00
2. Tukang Batu Hari/Orang 0.090 120,000.00 10,800.00
3. Kepala Tukang Hari/Orang 0.009 -
4. Mandor Hari/Orang 0.003 -
JUMLAH 16,200.00
B. BAHAN
1. Pipa Galvanis M' 1.200 - -
2. Perlengkapan 35 % harga pipa Ls 0.350 - -
JUMLAH -
JUMLAH A + B 16,200.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.108 100,000.00 10,800.00
2. Tukang Batu Hari/Orang 0.180 120,000.00 21,600.00
3. Kepala Tukang Hari/Orang 0.018 -
4. Mandor Hari/Orang 0.0054 -
JUMLAH 32,400.00
B. BAHAN
1. Pipa Galvanis M' 1.200 - -
2. Perlengkapan 35 % harga pipa Ls 0.350 - -
JUMLAH -
JUMLAH A + B 32,400.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.108 100,000.00 10,800.00
2. Tukang Batu Hari/Orang 0.180 120,000.00 21,600.00
3. Kepala Tukang Hari/Orang 0.0180 -
4. Mandor Hari/Orang 0.0054 -
JUMLAH 32,400.00
B. BAHAN
1. Pipa Galvanis M' 1.200 - -
2. Perlengkapan 35 % harga pipa Ls 0.350 - -
JUMLAH -
JUMLAH A + B 32,400.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.081 100,000.00 8,100.00
2. Tukang Batu Hari/Orang 0.135 120,000.00 16,200.00
3. Kepala Tukang Hari/Orang 0.0135 -
4. Mandor Hari/Orang 0.0041 -
JUMLAH 24,300.00
B. BAHAN
1. Pipa Galvanis M' 1.200 - -
Analisa_160 - 358
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.036 100,000.00 3,600.00
2. Tukang Batu Hari/Orang 0.060 120,000.00 7,200.00
3. Kepala Tukang Hari/Orang 0.006 -
4. Mandor Hari/Orang 0.002 -
JUMLAH 10,800.00
B. BAHAN
1. Pipa PVC M' 1.200 - -
2. Perlengkapan 35 % harga pipa Ls 0.350 - -
JUMLAH -
JUMLAH A + B 10,800.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.036 100,000.00 3,600.00
2. Tukang Batu Hari/Orang 0.060 120,000.00 7,200.00
3. Kepala Tukang Hari/Orang 0.006 -
4. Mandor Hari/Orang 0.002 -
JUMLAH 10,800.00
B. BAHAN
1. Pipa PVC M' 1.200 - -
2. Perlengkapan 35 % harga pipa Ls 0.350 - -
JUMLAH -
JUMLAH A + B 10,800.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.036 100,000.00 3,600.00
2. Tukang Batu Hari/Orang 0.060 120,000.00 7,200.00
3. Kepala Tukang Hari/Orang 0.006 -
4. Mandor Hari/Orang 0.002 -
JUMLAH 10,800.00
B. BAHAN
1. Pipa PVC M' 1.200 - -
2. Perlengkapan 35 % harga pipa Ls 0.350 - -
JUMLAH -
JUMLAH A + B 10,800.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.036 100,000.00 3,600.00
2. Tukang Batu Hari/Orang 0.060 120,000.00 7,200.00
3. Kepala Tukang Hari/Orang 0.006 -
4. Mandor Hari/Orang 0.002 -
JUMLAH 10,800.00
B. BAHAN
1. Pipa PVC M' 1.200 - -
Analisa_162 - 358
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.054 100,000.00 5,400.00
2. Tukang Batu Hari/Orang 0.090 120,000.00 10,800.00
3. Kepala Tukang Hari/Orang 0.009 -
4. Mandor Hari/Orang 0.0027 -
JUMLAH 16,200.00
B. BAHAN
1. Pipa PVC M' 1.200 - -
2. Perlengkapan 35 % harga pipa Ls 0.350 - -
JUMLAH -
JUMLAH A + B 16,200.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.081 100,000.00 8,100.00
2. Tukang Batu Hari/Orang 0.135 120,000.00 16,200.00
3. Kepala Tukang Hari/Orang 0.135 -
4. Mandor Hari/Orang 0.0041 -
JUMLAH 24,300.00
B. BAHAN
1. Pipa PVC M' 1.200 0 -
2. Perlengkapan 35 % harga pipa Ls 0.350 -
JUMLAH -
JUMLAH A + B 24,300.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.081 100,000.00 8,100.00
2. Tukang Batu Hari/Orang 0.135 120,000.00 16,200.00
3. Kepala Tukang Hari/Orang 0.135 -
4. Mandor Hari/Orang 0.0041 -
JUMLAH 24,300.00
B. BAHAN
1. Pipa PVC M' 1.200 0 -
2. Perlengkapan 35 % harga pipa Ls 0.350 -
JUMLAH -
JUMLAH A + B 24,300.00
A. TENAGA KERJA
1. Pekerja Hari/Orang - 100,000.00 -
2. Tukang Batu Hari/Orang 0.100 120,000.00 12,000.00
3. Kepala Tukang Hari/Orang 0.010 -
4. Mandor Hari/Orang - -
JUMLAH 12,000.00
B. BAHAN
1. Kran air Buah 1.000 - -
2. Seal tape Buah 0.025 5,500.00 137.50
Analisa_164 - 358
JUMLAH 137.50
JUMLAH A + B 12,137.50
Analisa_165 - 358
A. TENAGA KERJA
1. Pekerja Hari/Orang - 100,000.00 -
2. Tukang Batu Hari/Orang 0.100 120,000.00 12,000.00
3. Kepala Tukang Hari/Orang 0.010 -
4. Mandor Hari/Orang - -
JUMLAH 12,000.00
B. BAHAN
1. Floor drain Buah 1.000 - -
JUMLAH -
JUMLAH A + B 12,000.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 1.050 100,000.00 105,000.00
2. Tukang Las Hari/Orang 1.050 120,000.00 126,000.00
3. Kepala Tukang Hari/Orang 0.105 -
4. Mandor Hari/Orang 0.052 -
JUMLAH 231,000.00
B. BAHAN
1. Besi siku 30.30.3 Kg 15.000 100,000.00 1,500,000.00
1. Besi plat baja Kg 32.800 - -
2. Kawat las Kg 0.050 - -
JUMLAH 1,500,000.00
JUMLAH A + B 1,731,000.00
Galian Urugan Tanah
Volume Vol.
Dia. Luar Dlm. Gali Vol. Pasir
Dia. Pipa Lbr. Gali (m) Dia. Pipa Galian
Pipa (m) (m) (m³) (m³/m)
(m³/m)
3" 0.090 0.300 0.600 0.180 3" 0.180 0.039
2" 0.063 0.300 0.500 0.150 2" 0.150 0.036
1 1/2" 0.050 0.300 0.400 0.120 1 1/2" 0.120 0.034
1 1/4" 0.040 0.300 0.400 0.120 1 1/4" 0.120 0.029
1" 0.032 0.300 0.400 0.120 1" 0.120 0.029
Urugan Pasir
Vol. Pipa vol. Galian Tinggi Psr. Volume
Dia. Pipa
(m³/m) (m³/m) (m) (m³) π r² Vol. Pipa (m³/m)
A. PEKERJAAN TANAH
1.1. Galian Tanah
- Pekerja 57.240 - 57.240 Hok 100,000 5,724,000 5,724,000
1.2. Urugan Kembali
- Pekerja 24.193 - 24.193 Hok 100,000 2,419,312 2,419,312
B. PEMASANGAN PIPA
2.1 Pipa PVC Ø3"
- Pekerja - - - Hok 100,000 - - -
2.2 Pipa PVC Ø 2"
- Pekerja 23.464 - 23.464 Hok 100,000 2,346,382 2,346,382
2.3 Pipa PVC Ø 1 1/5"
- Pekerja - - - Hok 100,000 - -
PENGADAAN PIPA DAN ACCESSORIES 12,965,000 7.87 1.57 1.57 1.57 1.57 1.57
PEMASANGAN PIPA 8,266,000 5.02 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 90.00
AIR TANAH DALAM (BOR 6") 17,486,000 10.61 1.06 1.06 1.06 1.06 1.06 1.06 1.06 1.06 1.06 1.06
RESERVOAR ( 16 m³ ) 82,614,800 50.15 3.86 3.86 3.86 3.86 3.86 3.86 3.86 3.86 3.86 3.86 3.86 3.86 3.86
80.00
GARDU LISTRIK 10,309,000 6.26 1.56 1.56 1.56 1.56
LISTRIK PLN 3500 KVA 6,136,000 3.72 1.86 1.86
70.00
POMPA 9,850,000 5.98 1.49 1.49 1.49 1.49
2 PEMBANGUNAN SARANA CUCI TANGAN 7,408,000 4.50
Pembangunan sarana CTPS di sekolah 7,408,000 4.50 1.12 1.12 1.12 1.12 60.00
Pembangunan sarana CTPS di Pustu 7,408,000 4.50 1.12 1.12 1.12 1.12
3 KESEHATAN - - 50.00
MASYARAKAT - - 0.00 0.00 0.00 0.00 0.00 0.00
SEKOLAH - - 0.00 0.00 0.00 0.00 0.00
40.00
4 PEMBERDAYAAN 1,981,200 1.20
Pelatihan Teknik 396,180 0.24 0.24
Pelatihan Administrasi Keuangan 395,880 0.24 0.24 30.00
Pelatihan PHBS Masyarakat 396,380 0.24 0.24
Pelatihan Disabilitas 396,380 0.24 0.24 20.00
Pelatihan Kelompok Pengelola Sarana (KPSPAMS) 396,380 0.24 0.24
5 OPERASIONAL 5,532,000 3.36
10.00
ATK 2,766,000 1.68 0.84 0.84
Transportasi 2,766,000 1.68 0.42 0.42 0.42 0.42
0.00
TOTAL 164,734,000 100.00 2.22 1.06 4.92 6.49 6.91 6.49 8.49 10.05 12.36 12.59 10.73 6.61 4.78 4.36 4.36 0.74
RENCANA 2.22 1.06 4.92 6.49 6.91 6.49 8.49 10.05 12.36 12.59 10.73 6.61 4.78 4.36 4.36 0.74
KOMULATIF RENCANA 2.22 3.28 8.20 14.70 21.61 28.10 36.59 46.65 59.00 71.59 82.32 88.93 93.71 98.07 102.43 103.17
REALISASI
KOMULATIF REALISASI
DAFTAR HARGA BAHAN TAHUN 2019
PROGRAM PENYEDIAAN AIR MINUM DAN SANITASI BERBASIS MASYARAKAT
KEGIATAN : Pamsimas
DESA : Palipu
KECAMATAN : Tanasitolo
KABUPATEN : Wajo
HARGA
NO. JENIS BAHAN SAT. KETERANGAN
STANDARD (Rp.)
1 2 3 4 5
BAHAN DASAR
1 Batu Kali M³ Rp. 395,000.00
2 Batu Gunung M³ Rp. 395,000.00
3 Pasir Pasangan M³ Rp. 242,000.00
4 Pasir Beton M³ Rp. 306,000.00
5 Pasir Timbunan M³ Rp. 242,000.00
6 Batu pecah 1/2 cm (split) M³ Rp. 613,000.00
7 Batu pecah 2/3 cm M³ Rp. 591,000.00
8 Batu pecah 3/5 cm M³ Rp. 505,000.00
9 Semen Portland (PC) Kg Rp. 1,340.00
BAHAN DINDING
1 Batu Merah Bh Rp. 1,000.00
2 Rooster Bh Rp. 40,000.00
BAHAN LANTAI
1 Keramik 20 x 20 cm M² Rp -
2 Keramik 30 x 30 cm M² Rp -
BAHAN KACA
1 Kaca Bening 5 mm M²
BAHAN BESI
1 - Besi Beton Polos Ø 6 mm Btg Rp. 49,000.00 SNI 12 mtr
HARGA
NO. JENIS BAHAN SAT. KETERANGAN
STANDARD (Rp.)
1 2 3 4 5
Kg Rp. 18,560.61
2 - Besi Beton Polos Ø 8 mm Btg Rp. 75,000.00 SNI 12 mtr
Kg Rp. 15,822.78
3 - Besi Beton Polos Ø 10 mm Btg Rp. 117,000.00 SNI 12 mtr
Kg Rp. 15,802.27
4 - Besi Beton Polos Ø 12 mm Btg Rp. 169,000.00 SNI 12 mtr
Kg Rp. 15,859.61
5 - Besi Beton Polos Ø 14 mm Btg Rp. 230,000.00 SNI 12 mtr
Kg Rp. 15,840.22
6 - Besi Beton Polos Ø 16 mm Btg Rp. 300,000.00 SNI 12 mtr
Kg Rp. 15,822.78
7 Paku Biasa Kg Rp. 22,000.00
8 Paku Seng (Payung) RRT Kg Rp. 22,000.00
9 Kawat Beton Kg Rp. 23,000.00
10 Kawat Beronjong Bh Rp -
10 Besi Strep 30.30.3 Kg Rp. 100,000.00
BAHAN ATAP
1 Seng Gelombang Kecil Kaki Rp. 53,000.00
2 Seng Gelombang Besar Kaki Rp. 53,000.00
3 PENUTUp Man Hole Besi Plat 60 x 60 Rp. 1,113,000.00
4 Penutup Man Hole Besi Plat 80 x 80 LS Rp. 1,335,000.00
BAHAN PENGGANTUNG
1 Penggantung
- Grendel - Kecil (uk. 2") Bh Rp. 15,000.00
- Engsel Pintu Bh Rp. 39,000.00
- Gembok Bh Rp. 35,000.00
BAHAN PINTU
1 Kusen Pintu Kayu Bh Rp. 668,000.00
2 Kusen Jendela Kayu Bh Rp. 200,000.00
3 Daun Pintu Kayu Bh Rp. 757,000.00
4 Kunci Tanam Bh Rp. 223,000.00
5 Engsel Kupu-kupu Bh Rp. 39,000.00
6 Pintu Fiber Bh Rp. 400,000.00
7 Kaca 5 mm M2 Rp. 125,000.00
#REF! Rp. 7,000,000.00
BAHAN SANITER (SANITASI)
1 Kran Air 1/2" Bh Rp. 15,000.00
2 Kran Air 3/4" Bh Rp. 20,000.00
3 Stop Kran 3/4" Bh Rp. 35,000.00
4 Seal Tape Bh Rp. 5,000.00
5 Floor Drain Bh Rp. 35,000.00
6 Wastafel Tunggal Bh Rp. 200,000.00
BAHAN FINISHING
1 Cat Tembok Kg Rp. 105,000.00
2 Cat Kayu Kg Rp. 58,000.00
3 Cat Besi Kg Rp. 36,000.00
HARGA
NO. JENIS BAHAN SAT. KETERANGAN
STANDARD (Rp.)
1 2 3 4 5
4 Cat Water Silky Kg Rp. 40,000.00
5 Plamur Kg Rp. 9,000.00
6 Cat Meni Besi Kg Rp. 47,000.00
7 Cat Meni Kayu Kg Rp. 47,000.00
ALAT
1 Sewa Molen Hari Rp. 650,000.00
2 Gerobak Dorong Bh Rp. 470,000.00
3 Sekop Bh Rp. 50,000.00
4 Linggis Bh Rp. 50,000.00
5 Sendok Semen Bh Rp. 25,000.00
6 Ember Cor Bh Rp. 10,000.00
7 Cangkul Bh Rp. 65,000.00
8 Kuas Cat Besar Bh Rp. 12,000.00
9 Kuas Cat Kecil Bh Rp. 4,000.00
10 Gergaji Besi Bh Rp. 50,000.00
11 Mata Gergaji Bh Rp. 10,000.00
12 Kunci Pipa Gip . 1/2" - 3" Bh Rp. 305,000.00
13 Kunci Pipa Gip . 3" - 4" Bh Rp. 387,000.00
14 Sney Pipa Ø 1/2" - 2 1/2" Bh Rp. 1,300,000.00
15 Sney Pipa Ø 3" - 4" Bh Rp. 1,600,000.00
16 Tangga Monyet Pipa GIP Ø ¾" LS Rp. 2,000,000.00
BAHAN PIPA PVC
1 Pipa PVC S-12.5 Ø 90 - 3" Btg Rp. 265,000.00 6 mtr SNI 12,5 Bar
2 Pipa PVC AW Ø 90 - 3" Btg Rp - 4 mtr AW
3 Pipa PVC S-12.5 Ø 63 - 2" Btg Rp. 120,000.00 6 mtr SNI 12,5 Bar
4 Pipa PVC AW Ø 63 - 2" Btg Rp - 4 mtr AW
5 Pipa PVC S-12,5 Ø 50 - 1 1/2" Btg Rp. 95,000.00 6 mtr SNI
6 Pipa PVC AW Ø 50 - 1 1/2" Btg Rp. 80,000.00 4 mtr AW
7 Pipa PVC S-10 Ø 32 - 1" Btg Rp. 35,000.00 6 mtr SNI
8 Pipa PVC AW Ø 32 - 1" Btg Rp - 6 mtr SNI
9 Pipa PVC Ø 25 - 3/4" Btg Rp. 17,500.00 4 mtr SNI
10 Socked Ø 3" Bh Rp. 35,000.00 SNI
11 Sock Drat Luar Ø 3" Bh Rp. 85,000.00 SNI
12 Sock Drat Dalam Ø 3" Bh Rp. 85,000.00 SNI
13 Sock Drat Luar Ø 2" Bh Rp. 38,000.00 SNI
14 Sock Drat Dalam Ø 2" Bh Rp. 38,000.00 SNI
15 Sock Drat Luar Ø 1 1/2" Bh Rp. 15,000.00 SNI
16 Sock Drat Luar Ø 1" Bh Rp. 7,000.00 SNI
17 Sock Drat Luar Ø 3/4 Bh Rp. 6,000.00 SNI
18 Sock Drat Dalam Ø 3/4 Bh Rp. 6,000.00 SNI
19 Knee PVC Ø 3" Bh Rp. 104,000.00 SNI
20 Knee PVC Ø 2" Bh Rp. 32,000.00 SNI
21 Knee PVC Ø 1 ½" Bh Rp. 17,500.00 SNI
22 Knee PVC Ø 1 ¼" Bh Rp - SNI
23 Knee PVC Ø 2" AW Bh Rp - AW
24 Sambungan Tee Ø 3" Bh Rp. 100,000.00 SNI
25 Sambungan Tee Ø 2" Bh Rp. 50,000.00 SNI
HARGA
NO. JENIS BAHAN SAT. KETERANGAN
STANDARD (Rp.)
1 2 3 4 5
26 Sambungan Tee Ø1 ½" Bh Rp. 20,000.00 SNI
27 Sambungan Tee Ø 3" x 2" x 3" Bh Rp. 140,000.00 SNI
28 Sambungan Tee Ø 2" x Ø 1½" x 2" Bh Rp. 70,000.00 SNI
29 Sambungan Tee Ø 2" AW Bh Rp - AW
30 Reducer Ø 3" x Ø 2" Bh Rp. 40,000.00 SNI
31 Reducer Ø 3" x Ø 1 ½" Bh Rp. 35,000.00 SNI
32 Reducer Ø 2" x Ø 1 ½" Bh Rp. 30,000.00 SNI
33 Cap Ø 6" AW Bh Rp. 120,000.00 AW
34 Cap Ø 3" Bh Rp. 80,000.00 SNI
35 Cap Ø 2" Bh Rp. 60,000.00 SNI
36 Cap Ø1 ½" Bh Rp. 12,000.00 SNI
37 Cap Ø1" Bh Rp. 8,000.00 SNI
38 Gate Valve PVC Ø 3" Bh Rp. 300,000.00 SNI
39 Gate Valve PVC Ø 2" Bh Rp. 85,000.00 SNI
40 Gate Valve PVC Ø 1 ½" Bh Rp. 55,000.00 SNI
41 Gate Valve PVC Ø 1 ¼" Bh Rp. 40,000.00 SNI
42 Lem Pipa (Solvent Cement PVC) Kaleng Rp. 45,000.00
BAHAN PIPA GALVANIS
1 Pipa galvanis medium A Ø 3" Btg Rp. 1,200,000.00
2 Pipa galvanis medium A Ø 2" Btg Rp. 720,000.00
3 Pipa galvanis medium A Ø 1 ½" Btg Rp. 527,000.00
4 Pipa galvanis medium A Ø 1" Btg Rp. 348,000.00
5 Pipa galvanis medium A Ø 3/4" Btg Rp. 227,000.00
6 Socked Ø 3" Bh Rp. 103,000.00
7 Socked Ø 2" Bh Rp. 43,000.00
8 Socked Ø 1 1/2" Bh Rp. 37,000.00
9 Socked Ø 1" Bh Rp. 18,000.00
10 Socked Ø 3/4" Bh Rp. 11,000.00
11 Long Bend 90° Ø 3" Bh Rp -
12 Knee GIP 90° Ø 3" Bh Rp. 156,000.00
13 Long Bend 90° Ø 2" Bh Rp -
14 Knee GIP 90° Ø 2" Bh Rp. 56,000.00
15 Long Bend 90° Ø1 ½" Bh Rp -
16 Knee GIP 90° Ø1 ½" Bh Rp. 40,000.00
17 Long Bend 90° Ø 1" Bh Rp -
18 Knee GIP 90° Ø1" Bh Rp. 20,000.00
19 Knee/Bend 45° Ø 3" Bh Rp. 200,000.00
20 Knee/Bend 45° Ø 2" Bh Rp. 106,000.00
21 Knee/Bend 45° Ø1 ½" Bh Rp. 56,000.00
22 Long Bend 45° Ø 1" Bh Rp -
23 Knee / Bend 90° Ø 3/4" Bh Rp -
24 Sambungan Tee Ø 2" Bh Rp. 87,000.00
25 Sambungan Tee Ø 3" Bh Rp. 218,000.00
26 Sambungan Tee Ø 1 1/2" Bh Rp. 56,000.00
27 Sambungan Tee Ø 1" Bh Rp. 31,000.00
28 Sambungan Tee Ø 1 " Bh Rp. 31,000.00
29 Sambungan Tee Ø 1 1/2" x Ø 1" Bh Rp. 68,000.00
30 Sambungan Tee Ø 2", Ø1 1/2" x Ø2" Bh Rp. 70,000.00
31 Cap Ø1" Bh Rp. 18,000.00
HARGA
NO. JENIS BAHAN SAT. KETERANGAN
STANDARD (Rp.)
1 2 3 4 5
32 Cap Ø 1 ½" Bh Rp. 28,000.00
33 Cap Ø 2 " Bh Rp. 30,000.00
34 Gate Valve Ø 3" Bh Rp. 1,335,000.00
35 Gate Valve GIP Ø 2" Bh Rp. 493,000.00
36 Gate Valve GIP Ø 1 ½" Bh Rp. 300,000.00
37 Gate Valve GIP Ø 1" Bh Rp. 168,000.00
38 Double Nepple Ø 3" Bh Rp. 112,000.00
39 Double Nepple Ø 2" Bh Rp. 50,000.00
40 Double Nepple Ø 1 1/2" Bh Rp. 37,000.00
41 Double Nepple Ø 1" Bh Rp. 18,000.00
42 Double Nepple Ø 3/4" Bh Rp. 12,000.00
43 Clamp Sadle Ø 3" x 3/4" Bh Rp. 75,000.00
44 Clamp Sadle Ø 2" x 3/4" Bh Rp. 40,000.00
45 Clamp Sadle Ø 1 1/2" x 3/4" Bh Rp. 34,000.00
46 Air Valve (Pentil Udara) Ø 3/4" Bh Rp. 150,000.00
47 Check Valve Ø 3" Bh Rp. 1,120,000.00
48 Check Valve Ø 2" Bh Rp. 650,000.00
49 Check Valve Ø 1 ½" Bh Rp. 350,000.00
50 Watermur/Union GIP Ø 3" Bh Rp. 290,000.00
51 Watermur/Union GIP Ø 2" Bh Rp. 200,000.00
52 Watermur/Union GIP Ø 1 ½" Bh Rp. 81,000.00
53 Watermur/Union GIP Ø 1" Bh Rp. 62,000.00
54 Meteran Air Bh Rp. 150,000.00
HRG. STANDARD
NO. UPAH KERJA SAT. KET.
(Rp.)
1 2 3 4 5
1 Pekerja Org / Hr Rp. 100,000.00
2 Tukang Org / Hr Rp. 120,000.00
RENCANA ANGGARAN BIAYA
Provinsi/Kabupaten-Kota/Kecamatan/Desa : Sulawesi Selatan/Wajo/Pitumpanua/Kompong
Nomor RAB : Sub pekerjaan/Kegiatan :
Pekerjaan Kegiatan : Sarana Air Minum Ukuran/Dimensi :
Alelebbae, Dese
Biaya (Rp)
Kontribusi Masyarakat
APBN APBDES
inKind
11=4x8 12=5x8 13=6x8
134,400 -
- 1,760 -
90,832 -
- 56,628 -
- 59,242 -
- 369,720 -
- 81,544 -
- 497,700 -
- 283,895 -
- 155,831 -
- 31,436 -
- 19,909 -
- 45,859 -
- 117,947 -
- 86,624 -
- 121,628 -
- 253,684 -
- 86,506 -
- 6,806 -
233,568 -
- 15,840 -
75,600 -
- 69,300 -
111,600 -
Biaya (Rp)
Kontribusi Masyarakat
APBN APBDES
inKind
11=4x8 12=5x8 13=6x8
- 29 -
- 496 -
- 1,436 -
- 249,593 -
- 86,506 -
- 6,721 -
116,784 -
- 7,920 -
37,800 -
- 34,650 -
55,800 -
- 452,994 -
- 172,257 -
- 467,132 -
- 652,487 -
- 13,567 -
369,764 -
- 25,076 -
119,683 -
- - -
176,675 -
- 117,947 -
- 44,851 -
- 121,628 -
- 249,593 -
- 86,506 -
- 6,721 -
116,784 -
- 7,920 -
45,360 -
- 34,650 -
55,455 -
Biaya (Rp)
Kontribusi Masyarakat
APBN APBDES
inKind
11=4x8 12=5x8 13=6x8
- 1,291,500 -
- 468,501 -
- 169,666 -
- 668,000 -
- 757,000 -
- 117,000 -
- 223,000 -
- 14,288 -
- 13,224 -
- 14,987 -
- - -
- 674,048 -
- 241,105 -
- 160,700 -
- 33,210 -
- 387,450 -
- 1,007,370 -
1,740,106 11,443,587 -
1,741,000 11,443,000 -
- 40,000 -
- 40,000 -
- 48,000 -
- 160,875 -
- 5,850 -
- 6,120 -
- 26,414 -
Biaya (Rp)
Kontribusi Masyarakat
APBN APBDES
inKind
11=4x8 12=5x8 13=6x8
- 60,840 -
- 36,504 -
- 157,500 -
- 94,394 -
16,830 -
3,366 -
- 4,860 -
- 648 -
- 13,810 -
- 16,572 -
- 118,800 -
- 71,280 -
- 44,550 -
- 8,910 -
- 13,637 -
- 16,364 -
- 59,400 -
- 35,640 -
171,102 -
34,220 -
- 27,527 -
- 33,033 -
- 188,074 -
- 56,422 -
- 44,550 -
- 8,910 -
Biaya (Rp)
Kontribusi Masyarakat
APBN APBDES
inKind
11=4x8 12=5x8 13=6x8
- 13,637 -
- 16,364 -
- 59,400 -
- 35,640 -
- 553,500 -
- 221,400 -
10,640 -
1,642 -
- 1,476,000 -
- 885,600 -
738,000 -
442,800 -
73,800 -
278,964 -
1,771,364 4,701,024 -
1,771,300 4,701,000 -
3,512,300 16,144,000 -
Pelaksana Pamsimas
( SAHARUDDIN )
Ketua SATLAK
RENCANA ANGGARAN BIAYA
NAMA KEGIATAN : PENYEDIAAN AIR MINUM & SANITASI BERBASIS MASYARAKAT (PAMSIMAS)
PEKERJAAN : PEMBANGUNAN SARANA AIR BERSIH MASYARAKAT
SUB PEKERJAAN : PEMBANGUNAN SANITASI SEKOLAH
DESA
KECAMATAN
KABUPATEN
23 Pek. Pemasangan Pipa PVC AW Ø 1" (Air Kotor) 1.000 M' 50,800.00 - 0.096 50,800.00
23.1 Tenaga Kerja
Pekerja 0.036 0.036 O/H 100,000.00 3,600.00 0.036 3,600.00
Tukang Pipa 0.060 0.060 O/H 120,000.00 7,200.00 0.060 7,200.00
23.2 Bahan + Acc
Pipa PVC Ø 1" 1.000 1.000 M' 40,000.00 40,000.00 40,000.00
Ketua DPMU Kabupaten Wajo KKM "PUNCAK" Fasilitator Masyarakat Pelaksana Pamsimas
YTH BANGUNAN
Rp 2,800,000
Rp 39,000
Rp 2,000,000
Rp 28,000
Rp 2,800,000
Rp 44,000
Rp 2,800,000
Rp 32,000
Rp 2,000,000
1500
RZL. Perusahaan
Rizal
Rp 55,000.00
Rp 110,000.00
Rp 67,000.00
Rp 165,000.00
Rp 140,000.00
Rp 100,000.00
Rp 70,000.00
Rp 50,000.00
Rp 30,000.00
Rp 20,000.00
Rp 20,000.00
RZL. Perusahaan
Rizal
Rp 125,000
550000 Rp 125,000
650000 Rp 162,500
650000 Rp 150,000
1300000 Rp 300,000
1250000 Rp 300,000
Rp 300,000
650
Bengkel Firdaus
Rp 750,000
Rp 500,000
Rp 2,500,000
RENCANA ANGGARAN BIAYA (RAB)
NAMA KEGIATAN : PENYEDIAAN AIR MINUM & SANITASI BERBASIS MASYARAKAT (PAMSIMAS)
PEKERJAAN : PEMBANGUNAN SARANA AIR BERSIH MASYARAKAT
SUB PEKERJAAN : PEMBANGUNAN RUMAH POMPA/PANEL
DESA : PALIPPU
KECAMATAN : TANASITOLO
KABUPATEN : WAJO
4 Pasangan Batu Bata, 1/2 Bata 1:3 14.268 M2 72,611.00 2,039,407.00 - 5.993 2,039,407.00
4.1 Tenaga Kerja
Pekerja 4.566 4.566 O/H 100,000.00 456,576.00 4.566 456,576.00
Tukang Batu 1.427 1.427 O/H 120,000.00 171,216.00 1.427 171,216.00
4.2 Bahan
Bata merah 5 x 11 x 22 cm 998.760 998.760 Bh 1,000.00 998,760.00 998,760.00
Semen portland 205.031 205.031 Kg 1,340.00 274,741.00 274,741.00
Pasir pasang 0.571 0.571 M3 242,000.00 138,114.00 138,114.00
9 Pek. Pasang Kaso + reng atap kayu kamper 9.505 M2 54,396.00 660,458.00 95,052.00 1.901 565,406.00
9.1 Tenaga Kerja
Pekerja 0.951 0.951 O/H 100,000.00 95,052.00 95,052.00 0.951
Tukang Kayu 0.951 0.951 O/H 120,000.00 114,062.00 0.951 114,062.00
9.2 Bahan
Kayu kamper, balok 0.114 0.114 M3 3,682,000.00 419,977.00 419,977.00
Paku biasa 2" - 5" 1.426 1.426 Kg 22,000.00 31,367.00 31,367.00
10 Pek. Pasang Atap Seng gelombang 11.424 M2 46,250.00 648,218.00 137,092.00 2.056 511,126.00
10.1 Tenaga Kerja
Pekerja 1.371 1.371 O/H 100,000.00 137,092.00 137,092.00 1.371
Tukang Kayu 0.685 0.685 O/H 120,000.00 82,255.00 0.685 82,255.00
10.2 Bahan
Seng Gelombang BJLS 0,03 (6 Kaki) 7.997 7.997 Lbr 53,000.00 423,845.00 423,845.00
Paku seng 0.228 0.228 Kg 22,000.00 5,026.00 5,026.00
11 Pek. Listplank 2x(2x20 cm) kayu kamper 16.340 M' 41,104.83 898,457.00 163,400.00 3.268 735,057.00
11.1 Tenaga Kerja
Pekerja 1.634 1.634 O/H 100,000.00 163,400.00 163,400.00 1.634
Tukang Kayu 1.634 1.634 O/H 120,000.00 196,080.00 1.634 196,080.00
11.2 Bahan
Kayu Kamper, papan 0.141 0.141 Lbr 3,682,000.00 517,409.00 517,409.00
Paku Biasa 2" - 5" 0.980 0.980 Kg 22,000.00 21,568.00 21,568.00
13 Pasang Pintu Panel Kayu Kamper 1.296 M2 330,487.60 709,274.00 - 4.536 709,274.00
13.1 Tenaga Kerja
Pekerja 1.296 1.296 O/H 100,000.00 129,600.00 1.296 129,600.00
Tukang Kayu 3.240 3.240 O/H 120,000.00 388,800.00 3.240 388,800.00
13.2 Bahan
Kayu kamper, Papan 0.052 0.052 M3 3,682,000.00 190,874.00 190,874.00
14 Pasang Kunci Tanam Biasa 1.000 Bh 75,400.00 54,800.00 200.00 0.002 54,600.00
14.1 Tenaga Kerja
Pekerja 0.002 0.002 O/H 100,000.00 200.00 200.00 0.002
Tukang Kayu - - O/H 120,000.00 - - -
14.2 Bahan
Kunci tanam biasa 1.000 1.000 Bh 54,600.00 54,600.00 54,600.00
NAMA KEGIATAN : PENYEDIAAN AIR MINUM & SANITASI BERBASIS MASYARAKAT (PAMSIMAS)
PEKERJAAN : PEMBANGUNAN SARANA AIR BERSIH MASYARAKAT
SUB PEKERJAAN : PEMBANGUNAN SUMUR GALI (SGL)
DESA : PALIPPU
KECAMATAN : TANASITOLO
KABUPATEN : WAJO
7 Pas. Pondasi Batu Kali 1 PC : 3 Pasir 41.800 M3 516,027.40 43,662,190.00 - 87.780 43,662,190.00
7.1 Tenaga Kerja
Pekerja 62.700 62.700 O/H 100,000.00 6,270,000.00 62.700 6,270,000.00
Tukang Batu 25.080 25.080 O/H 120,000.00 3,009,600.00 25.080 3,009,600.00
7.2 Bahan
Batu Kali 45.980 45.980 M3 395,000.00 18,162,100.00 18,162,100.00
Semen Portland 8,443.600 8,443.600 Kg 1,340.00 11,314,424.00 11,314,424.00
Pasir Pasang 20.273 20.273 M3 242,000.00 4,906,066.00 4,906,066.00
10 Sloof Beton Bertulang (Diatas Pondasi) 0.456 M3 3,002,648.10 2,086,207.00 442,776.00 2.371 1,643,431.00
10.1 Tenaga Kerja
Pekerja 2.212 2.212 O/H 100,000.00 221,160.00 221,160.00 2.212
Tukang Batu 0.160 0.160 O/H 120,000.00 19,152.00 0.160 19,152.00
Tukang Kayu - - O/H 120,000.00 - - -
Tukang Besi - - O/H 120,000.00 - - -
10.2 Bahan
Kayu terentang 0.123 0.123 M 3
1,800,000.00 221,616.00 221,616.00
Paku biasa 2" - 5' 0.912 0.912 Kg 22,000.00 20,064.00 20,064.00
Minyak bekisting 0.274 0.274 Ltr - - -
Besi beton polos 68.400 68.400 Kg 15,859.61 1,084,797.00 1,084,797.00
Kawat beton 1.368 1.368 Kg 23,000.00 31,464.00 31,464.00
Semen portland composite 147.288 147.288 Kg 1,340.00 197,365.00 197,365.00
Pasir beton 0.237 0.237 M3 306,000.00 72,558.00 72,558.00
Koral beton 0.356 0.356 M3 613,000.00 218,031.00 218,031.00
11 Sloof Beton Bertulang (Dibawah Plat Penutup) 0.228 M3 3,002,648.10 1,023,896.00 221,388.00 1.186 802,508.00
11.1 Tenaga Kerja
Pekerja 1.106 1.106 O/H 100,000.00 110,580.00 110,580.00 1.106
Tukang Batu 0.080 0.080 O/H 120,000.00 9,576.00 0.080 9,576.00
Tukang Kayu - - O/H 120,000.00 - - -
Tukang Besi - - O/H 120,000.00 - - -
11.2 Bahan
Kayu terentang 0.062 0.062 M3 1,800,000.00 110,808.00 110,808.00
Paku biasa 2" - 5' 0.456 0.456 Kg 22,000.00 10,032.00 10,032.00
Minyak bekisting 0.137 0.137 Ltr - - -
Besi beton polos 34.200 34.200 Kg 15,859.61 542,398.00 542,398.00
Kawat beton 0.684 0.684 Kg 23,000.00 15,732.00 15,732.00
Semen portland composite 73.644 73.644 Kg 1,340.00 98,682.00 98,682.00
Pasir beton 0.119 0.119 M3 306,000.00 36,279.00 36,279.00
Koral beton 0.178 0.178 M3 505,000.00 89,809.00 89,809.00
12 Membuat Plat Beton Bertulang (Tebal 15 cm) 2.129 M3 3,532,820.40 10,323,117.00 2,460,546.00 13.090 7,862,571.00
12.1 Tenaga Kerja
Pekerja 12.345 12.345 O/H 100,000.00 1,234,530.00 1,234,530.00 12.345
Tukang Batu 0.745 0.745 O/H 120,000.00 89,397.00 0.745 89,397.00
Tukang Kayu - - O/H 120,000.00 - - -
Tukang Besi - - O/H 120,000.00 - - -
12.2 Bahan
Kayu terentang 0.681 0.681 M3 1,800,000.00 1,226,016.00 1,226,016.00
Paku biasa 2" - 5' 6.811 6.811 Kg 22,000.00 149,846.00 149,846.00
Minyak bekisting 3.406 3.406 Ltr - - -
Besi beton polos 212.850 212.850 Kg 15,859.61 3,375,717.00 3,375,717.00
Kawat beton 4.789 4.789 Kg 23,000.00 110,149.00 110,149.00
Semen portland composite 687.506 687.506 Kg 1,340.00 921,257.00 921,257.00
Pasir beton 1.107 1.107 M3 306,000.00 338,686.00 338,686.00
Koral beton 1.660 1.660 M3 505,000.00 838,416.00 838,416.00
Kayu Borneo balok 0.255 0.255 M3 1,800,000.00 459,756.00 459,756.00
Plywood 9 mm 5.960 5.960 Lmbr 110,000.00 655,578.00 655,578.00
Dolken Ø 8 cm/4 m 29.799 29.799 Btg 31,000.00 923,769.00 923,769.00
13 Pek. Urugan Sirtu 2.400 M' 130,500.00 984,960.00 288,000.00 2.880 696,960.00
13.1 Tenaga Kerja
Pekerja 2.880 2.880 O/H 100,000.00 288,000.00 288,000.00 2.880
13.2 Bahan
Sirtu 2.880 2.880 2.880 M3 242,000.00 696,960.00 696,960.00
23,340,000.00
167.03 80,838,400.00
RENCANA ANGGARAN BIAYA
35,029,000
1 PENGADAAN APD
Pengadaan Masker Untuk Tukang dan Pekerja 20.00 20.00 Bh 10,000 200,000 200,000
Pengadaan Kaos Tangan Untuk Tukang dan Pekerja 20.00 20.00 Bh 10,000 200,000 200,000
A. PEKERJAAN TANAH
1.1. Galian Tanah
- Pekerja 47.433 - 47.433 Hok 100,000 4,743,263 4,743,263 -
1.2. Urugan Kembali
- Pekerja 10.280 - 10.280 - Hok 100,000 1,027,984 1,027,984 -
1.3 Urugan Pasir (Upah)
- Pekerja - - - Hok 100,000 - - -
1.4 Urugan Pasir (Bahan)
- Pasir Urug - - - M3 242,000 - - -
B. PEMASANGAN PIPA
2.1 Pipa PVC Ø 3"
- Pekerja - - - Hok 100,000 - - -
2.2 Pipa PVC Ø 2"
- Pekerja 20.304 20.304 - Hok 100,000 2,030,400 2,030,400 -
2.3 Pipa PVC Ø 1 1/2"
- Pekerja 0.648 0.648 - Hok 100,000 64,800 64,800 -
1.1 Pengadaan Pipa blank dan Pipa Screen PVC SNI Ø 3'' 40.00 M' - -
1.2 Pengadaan dan pemasangan tutup sumur Ø 3'' 1.00 Ls 500,000 500,000
1.3 Pengadaan dan pemasangan saringan screen (rang plastik & ijuk) 1.00 Ls 500,000 500,000
Total 1 1,000,000
2. UPAH
2.1 Pemboran pada segala pormasi Ø 3'' 40.00 M' 150,000 6,000,000
2.2 Pembersihan lubang dengan sirkulasi lumpur 1.00 Ls 200,000 200,000
2.3 Pemasangan casing pipa 3" 40.00 M' 10,000 400,000
2.4 Pemasangan, pembongkaran dan pemindahan instalasi pompa uji 1.00 Ls 200,000 200,000
2.5 Pemompaan uji meliputi :
a. Uji debit tetap (Long priode test) 48.00 Jam 5,000 240,000
Total 2 7,040,000
Jumlah Total 8,040,000
Volume Harga
URAIAN Kontribusi Masyarakat Satuan Satuan
Total APBD Total
inCash inKind Rp
1 2=3+4+5 3 4 5 6 7 8=2x7
1 BAHAN
A. PEKERJAAN BETON
1.1. Balok 15x 25 (R)
* Beton
- Semen portland 91.280 91.280 Kg 1,340 122,315
- Pasir Beton 0.152 0.152 M³ 306,000 46,512
- Batu pecah 2/3 cm 0.213 0.213 M³ 591,000 126,133
* Pembesian
- Besi beton Polos Ø 10 24.615 24.615 Kg 15,802 388,979
- Besi beton Polos Ø 6 12.940 12.940 Kg 18,561 240,178
- Kawat beton 0.537 0.537 Kg 23,000 12,340
* Bekisting
- Kayu papan kls. 3/20 0.066 0.066 - M³ 45,000 2,961
- Paku biasa 2" - 5" 0.658 - 0.658 Kg 22,000 14,476
- Balok Kayu klas III uk. 5/7 0.030 - 0.030 M³ 2,800,000 82,908
- Tripleks 6 mm - - - Lbr 80,000 -
- Bambu 3.290 3.290 - Btg #NAME? #NAME?
1.2. Plat Lantai t. 15 cm
* Beton
- Semen portland 301.224 301.224 Kg 1,340 403,640
- Pasir Beton 0.502 0.502 M³ 306,000 153,490
- Batu pecah 2/3 cm 0.704 0.704 M³ 591,000 416,237
Volume Harga
URAIAN Kontribusi Masyarakat Satuan Satuan
Total APBD Total
inCash inKind Rp
1 2=3+4+5 3 4 5 6 7 8=2x7
* Pembesian
- Besi beton Polos Ø 8 39.235 39.235 Kg 15,823 620,813
- Kawat beton 0.561 0.561 Kg 23,000 12,892
* Bekisting
- Kayu papan kls. 3/20 - - - M³ 45,000 -
- Paku biasa 2" - 5" 0.676 0.676 Kg 22,000 14,872
- Balok Kayu klas III uk. 5/7 0.025 0.025 M³ 2,800,000 70,980
- Tripleks 6 mm 0.592 0.592 Lbr 80,000 47,320
- Bambu 10.140 10.140 - Btg #NAME? #NAME?
1.3. Kolom 15x15 (Q)
* Beton
- Semen portland 55.420 55.420 Kg 1,340 74,263
- Pasir Beton 0.092 0.092 M³ 306,000 28,239
- Batu pecah 2/3 cm 0.130 0.130 M³ 591,000 76,580
* Pembesian
- Besi beton Polos Ø 10 23.323 23.323 Kg 15,802 368,550
- Besi beton Polos Ø 6 7.346 7.346 Kg 18,561 136,343
- Kawat beton 0.438 0.438 Kg 23,000 10,077
* Bekisting
- Kayu papan kls. 3/20 0.090 - 0.090 M³ 45,000 4,032
- Paku biasa 2" - 5" 0.896 0.896 Kg 22,000 19,712
- Balok Kayu klas III uk. 5/7 0.034 - 0.034 M³ 2,800,000 94,080
- Tripleks 6 mm - - Lbr 80,000 -
- Bambu 2.240 2.240 - Btg #NAME? #NAME?
Volume Harga
URAIAN Kontribusi Masyarakat Satuan Satuan
Total APBD Total
inCash inKind Rp
1 2=3+4+5 3 4 5 6 7 8=2x7
1.4. Ringbalk 15 x 15 ( P )
* Beton
- Semen portland 20.538 20.538 Kg 1,340 27,521
- Pasir Beton 0.034 0.034 M³ 306,000 10,465
- Batu pecah 2/3 cm 0.048 0.048 M³ 591,000 28,380
* Pembesian
- Besi beton Polos Ø 10 9.588 9.588 Kg 15,802 151,515
- Besi beton Polos Ø 6 1.843 1.843 Kg 18,561 34,214
- Kawat beton 0.163 0.163 Kg 23,000 3,756
* Bekisting
- Kayu papan kls. 3/20 0.010 0.010 - M³ 45,000 432
- Paku biasa 2" - 5" 0.096 0.096 Kg 22,000 2,112
- Balok Kayu klas III uk. 5/7 0.004 0.004 M³ 2,800,000 12,096
- Tripleks 6 mm 0.084 0.084 Lbr 80,000 6,720
- Bambu 0.480 0.480 - Btg #NAME? #NAME?
1.5. Plat Atap t. 12 cm
* Beton
- Semen portland 91.606 91.606 Kg 1,340 122,752
- Pasir Beton 0.153 0.153 M³ 306,000 46,678
- Batu pecah 2/3 cm 0.214 0.214 M³ 591,000 126,583
* Pembesian
- Besi beton Polos Ø 8 17.696 17.696 Kg 15,823 280,000
- Kawat beton 0.253 0.253 Kg 23,000 5,814
Volume Harga
URAIAN Kontribusi Masyarakat Satuan Satuan
Total APBD Total
inCash inKind Rp
1 2=3+4+5 3 4 5 6 7 8=2x7
* Bekisting
- Kayu papan kls. 3/20 - - - M³ 45,000 -
- Paku biasa 2" - 5" 0.542 0.542 Kg 22,000 11,924
- Balok Kayu klas III uk. 5/7 0.020 0.020 M³ 2,800,000 56,910
- Tripleks 6 mm 0.474 0.474 Lbr 80,000 37,940
- Bambu 8.130 8.130 - Btg #NAME? #NAME?
B. PEKERJAAN DINDING
2.1. Pas.Batu Merah 1/2 (1:4)
- Bata merah 1,026.200 1,026.200 Bh 1,000 1,026,200
- Semen Portland 168.590 168.590 Kg 1,340 225,911
- Pasir pasang 0.630 0.630 M³ 242,000 152,552
2.2. Pas. Rooster
- Rooster 6.000 6.000 Bh 40,000 240,000
- Semen Portland 2.200 2.200 Kg 1,340 2,948
- Pasir pasang 0.007 0.007 M³ 242,000 1,694
C. PEKERJAAN PINTU
3.1. Pekerjaan Pintu
- Kusen Pintu 1.000 1.000 Bh 668,000 668,000
- Daun Pintu 1.000 1.000 Bh 757,000 757,000
- Engsel Kupu kupu 3.000 3.000 Bh 39,000 117,000
- Kunci Tanam 1.000 1.000 Bh 223,000 223,000
3.2. Pengecatan Bidang Kayu baru
- Cat meni 0.680 0.680 Kg 47,000 31,960
- Plamir Kayu 0.510 0.510 Kg 9,000 4,590
- Cat dasar 0.578 0.578 Kg 58,000 33,524
- Cat penutup 2 kali 0.884 0.884 Kg 58,000 51,272
Volume Harga
URAIAN Kontribusi Masyarakat Satuan Satuan
Total APBD Total
inCash inKind Rp
1 2=3+4+5 3 4 5 6 7 8=2x7
D. PEKERJAAN FINISHING
4.1. Plesteran
- Semen Portland 141.357 141.357 Kg 1,340 189,418
- Pasir pasang 0.544 0.544 M³ 87,500 47,572
4.2. Acian
- Semen Portland 55.218 55.218 Kg 1,340 73,991
4.3. Pengecatan Tembok Baru
- Plamir tembok 1.318 1.318 Kg 9,000 11,862
- Cat dasar 1.318 1.318 Kg 105,000 138,390
- Cat tembok 3.427 3.427 Kg 105,000 359,814
- - 122,315
- - 46,512
- - 126,133
- - 388,979
- - 240,178
- - 12,340
- 2,961 -
- - 14,476
- - 82,908
- - -
#NAME? #NAME? #NAME?
- - 403,640
- - 153,490
- - 416,237
Biaya (Rp)
Kontribusi Masyarakat
APBD
inCash inKind
9=3x7 10=4x7 11=5x7
- - 620,813
- - 12,892
- - -
- - 14,872
- - 70,980
- - 47,320
#NAME? #NAME? #NAME?
- - 74,263
- - 28,239
- 76,580
- - 368,550
- - 136,343
- - 10,077
- - 4,032
- - 19,712
- - 94,080
- - -
#NAME? #NAME? #NAME?
Biaya (Rp)
Kontribusi Masyarakat
APBD
inCash inKind
9=3x7 10=4x7 11=5x7
- - 27,521
- - 10,465
- - 28,380
- - 151,515
- - 34,214
- - 3,756
- 432 -
- - 2,112
- - 12,096
- - 6,720
#NAME? #NAME? #NAME?
- - 122,752
- - 46,678
- - 126,583
- - 280,000
- - 5,814
Biaya (Rp)
Kontribusi Masyarakat
APBD
inCash inKind
9=3x7 10=4x7 11=5x7
- - -
- - 11,924
- - 56,910
- - 37,940
#NAME? #NAME? #NAME?
- - 1,026,200
- - 225,911
- - 152,552
- - 240,000
- - 2,948
- - 1,694
- - 668,000
- - 757,000
- - 117,000
- - 223,000
- - 31,960
- - 4,590
- - 33,524
- - 51,272
Biaya (Rp)
Kontribusi Masyarakat
APBD
inCash inKind
9=3x7 10=4x7 11=5x7
- - 189,418
- - 47,572
- - 73,991
- - 11,862
- - 138,390
- - 359,814
- 46,200 -
- - 9,240
- 25,037 -
- - 30,044
- 217,140 -
- - 130,284
Biaya (Rp)
Kontribusi Masyarakat
APBD
inCash inKind
9=3x7 10=4x7 11=5x7
- 152,460 -
- 30,492 -
- - 26,157
- - 31,388
- 111,540 -
- - 66,924
- 28,050 -
- 5,610 -
- - 20,446
- - 24,535
- - 147,840
- - 88,704
- 10,395 -
- - 2,079
- 7,621 -
- - 9,145
Biaya (Rp)
Kontribusi Masyarakat
APBD
inCash inKind
9=3x7 10=4x7 11=5x7
- - 15,840
- - 9,504
- 46,365 -
- 9,273 -
- - 11,797
- - 14,157
- 178,860 -
- - 107,316
- 439,800 -
- 175,920 -
- 6,000 -
- 2,400 -
- 140,000 -
- 504,000 -
- 23,800 -
- 3,672 -
Biaya (Rp)
Kontribusi Masyarakat
APBD
inCash inKind
9=3x7 10=4x7 11=5x7
- 679,600 -
- - 407,760
- 339,800 -
- - 203,880
- 26,360 -
- 99,641 -
- 3,310,036 1,357,040
- 3,310,000 1,357,100
#NAME? #NAME? #NAME?
Dibuat Oleh :
Pelaksana Pamsimas
( SAHARUDDIN )
Ketua SATLAK
RENCANA ANGGARAN BIAYA
Provinsi/Kabupaten-Kota/Kecamatan/Kelurahan : Sulawesi Selatan/Wajo/Pitumpanua/Benteng
Nomor RAB : 03 Sub pekerjaan/Kegiatan : Reservoir & Gardu Listrik
Pekerjaan Kegiatan : Sarana Air Minum Ukuran/Dimensi : 2,8 x 2,8 x 2,1 m
Kapasitas : 16 m³
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5 3 4 5 6 7 8=2x7 9=3x7 10=4x7 11=5x7
1 BAHAN
A. PEKERJAAN PENDAHULUAN
1.1 Pemasangan Bowplank
- Kayu klas III uk. 5/7 0.180 0.180 - M³ 2,800,000 504,000 - 504,000 -
- Paku biasa 2" - 5" 0.256 0.256 Kg 22,000 5,632 - - 5,632
- Kayu papan kls. 3/20 0.090 0.090 - M³ 2,800,000 250,880 - 250,880 -
B. PEKERJAAN TANAH
2.1 Urugan Pasir
- Pasir urug 1.321 1.321 M³ 242,000 319,730 - - 319,730
C. PEKERJAAN BETON
3.1 Lantai Kerja t. 5 cm
- Semen Portland 140.760 140.760 M³ 1,340 188,618 - - 188,618
- Pasir beton 0.390 0.390 M³ 306,000 119,453 - - 119,453
- Batu pecah 2/3 cm 0.466 0.466 M³ 591,000 275,154 - - 275,154
3.2 Rabat Beton Lantai Dasar 10 cm
- Semen Portland 62.618 62.618 M³ 1,340 83,907 - - 83,907
- Pasir beton 0.174 0.174 M³ 306,000 53,139 - - 53,139
- Batu pecah 2/3 cm 0.207 0.207 M³ 591,000 122,403 - - 122,403
3.3 Pondasi Poor Plat 1,5 x 1,5
* Beton
- Semen portland 1,108.800 1,108.800 Kg 1,340 1,485,792 - - 1,485,792
- Pasir Beton 1.645 1.645 M³ 306,000 503,294 - - 503,294
- Batu pecah 2/3 cm 2.406 2.406 M³ 591,000 1,421,749 - - 1,421,749
* Pembesian
- Besi beton Polos Ø 14 276.335 276.335 Kg 15,840 4,377,212 - - 4,377,212
- Kawat beton 3.948 3.948 Kg 23,000 90,796 - - 90,796
* Bekisting
- Kayu kls. III 0.384 0.384 - M³ 2,800,000 1,075,200 - 1,075,200 -
- Paku biasa 2" - 5" 2.880 2.880 Kg 22,000 63,360 - - 63,360
3.4 Kolom 30x30
* Beton
- Semen portland 1,140.480 1,140.480 Kg 1,340 1,528,243 - - 1,528,243
- Pasir Beton 1.692 1.692 M³ 306,000 517,673 - - 517,673
- Batu pecah 2/3 cm 2.474 2.474 M³ 591,000 1,462,370 - 1,462,370
* Pembesian
- Besi beton Polos Ø 16 387.732 387.732 Kg 15,823 6,135,002 - - 6,135,002
- Besi beton Polos Ø 8 109.372 109.372 Kg 15,823 1,730,570 - - 1,730,570
- Kawat beton 7.101 7.101 Kg 23,000 163,334 - - 163,334
* Bekisting
- Kayu Kls. III - - - M³ 2,800,000 - - - -
- Paku biasa 2" - 5" 5.760 5.760 Kg 22,000 126,720 - - 126,720
- Balok Kayu Kls. II 0.216 - 0.216 M³ 2,800,000 604,800 - - 604,800
- Tripleks 9 mm 5.040 5.040 Lbr 110,000 554,400 - - 554,400
- Bambu 21.600 21.600 - Btg 25,000 540,000 - 540,000 -
3.5 Kolom 20x20 K2
* Beton
- Semen portland 129.536 129.536 Kg 1,340 173,578 - - 173,578
- Pasir Beton 0.192 0.192 M³ 306,000 58,797 - - 58,797
- Batu pecah 2/3 cm 0.281 0.281 M³ 591,000 166,096 - 166,096
* Pembesian
- Besi beton Polos Ø 12 35.794 35.794 Kg 15,860 567,687 - - 567,687
- Besi beton Polos Ø 8 17.787 17.787 Kg 15,823 281,436 - - 281,436
- Kawat beton 0.765 0.765 Kg 23,000 17,605 - - 17,605
* Bekisting
- Kayu Kls. III - - - M³ 2,800,000 - - - -
- Paku biasa 2" - 5" 1.472 1.472 Kg 22,000 32,384 - - 32,384
- Balok Kayu Kls. II 0.055 0.055 - M³ 2,800,000 154,560 - 154,560 -
- Tripleks 9 mm 0.859 0.859 Lbr 110,000 94,453 - - 94,453
- Bambu 3.680 3.680 - Btg 25,000 92,000 - 92,000 -
3.6 Kolom 15x15 KP
* Beton
- Semen portland 49.421 49.421 Kg 1,340 66,224 - - 66,224
- Pasir Beton 0.073 0.073 M³ 306,000 22,433 - - 22,433
- Batu pecah 2/3 cm 0.107 0.107 M³ 591,000 63,369 - 63,369
* Pembesian
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5 3 4 5 6 7 8=2x7 9=3x7 10=4x7 11=5x7
- Besi beton Polos Ø 12 24.385 24.385 Kg 15,860 386,736 - - 386,736
- Besi beton Polos Ø 8 8.617 8.617 Kg 15,823 136,348 - - 136,348
- Kawat beton 0.471 0.471 Kg 23,000 10,844 - - 10,844
* Bekisting
- Kayu Kls. III - - - M³ 2,800,000 - - - -
- Paku biasa 2" - 5" 0.749 0.749 Kg 22,000 16,474 - - 16,474
- Balok Kayu Kls. II 0.056 0.056 - M³ 2,800,000 157,248 - 157,248 -
- Tripleks 9 mm 0.655 0.655 Lbr 110,000 72,072 - - 72,072
- Bambu 1.872 1.872 - Btg 25,000 46,800 - 46,800 -
3.7 Balok 20 x 30 (B2)
* Beton
- Semen portland 625.152 625.152 Kg 1,340 837,704 - - 837,704
- Pasir Beton 0.927 0.927 M³ 306,000 283,762 - - 283,762
- Batu pecah 2/3 cm 1.356 1.356 M³ 591,000 801,596 - - 801,596
* Pembesian
- Besi beton Polos Ø 14 265.551 265.551 Kg 15,840 4,206,384 - - 4,206,384
- Besi beton Polos Ø 8 61.745 61.745 Kg 15,823 976,985 - - 976,985
- Kawat beton 4.676 4.676 Kg 23,000 107,540 - - 107,540
* Bekisting
- Kayu Kls. III - - - M³ 2,800,000 - - - -
- Paku biasa 2" - 5" 3.157 - 3.157 Kg 22,000 69,461 - - 69,461
- Balok Kayu Kls. II 0.213 0.213 - M³ 2,800,000 596,736 - 596,736 -
- Tripleks 9 mm 2.763 - 2.763 Lbr 110,000 303,893 - - 303,893
- Bambu 15.787 15.787 - Btg 25,000 394,667 - 394,667 -
3.8 Balok 20 x 35 ( B1 )
* Beton
- Semen portland 295.680 295.680 Kg 1,340 396,211 - - 396,211
- Pasir Beton 0.439 0.439 M³ 306,000 134,212 - - 134,212
- Batu pecah 2/3 cm 0.642 0.642 M³ 591,000 379,133 - - 379,133
* Pembesian
- Besi beton Polos Ø 14 107.908 107.908 Kg 15,840 1,709,283 - - 1,709,283
- Besi beton Polos Ø 8 33.143 33.143 Kg 15,823 524,415 - - 524,415
- Kawat beton 2.015 2.015 Kg 23,000 46,345 - - 46,345
* Bekisting
- Kayu Kls. III - - - M³ 2,800,000 - - - -
- Paku biasa 2" - 5" 1.440 1.440 Kg 22,000 31,680 - - 31,680
- Balok Kayu Kls. II 0.097 0.097 - M³ 2,800,000 272,160 - 272,160 -
- Tripleks 9 mm 1.260 1.260 Lbr 110,000 138,600 - - 138,600
- Bambu 7.200 7.200 - Btg 25,000 180,000 - 180,000 -
3.9 Sloef 20 x 30 ( S1 )
* Beton
- Semen portland 323.136 323.136 Kg 1,340 433,002 - - 433,002
- Pasir Beton 0.479 0.479 M³ 306,000 146,674 - - 146,674
- Batu pecah 2/3 cm 0.701 0.701 M³ 591,000 414,338 - - 414,338
* Pembesian
- Besi beton Polos Ø 14 156.818 156.818 Kg 15,840 2,484,037 - - 2,484,037
- Besi beton Polos Ø 8 38.032 38.032 Kg 15,823 601,766 - - 601,766
- Kawat beton 2.784 2.784 Kg 23,000 64,022 - - 64,022
* Bekisting
- Kayu Kls. III - - - M³ 2,800,000 - - - -
- Paku biasa 2" - 5" 2.448 2.448 Kg 22,000 53,856 - - 53,856
- Balok Kayu Kls. II 0.110 0.110 - M³ 2,800,000 308,448 - 308,448 -
- Tripleks 9 mm 2.142 2.142 Lbr 110,000 235,620 - - 235,620
- Bambu 12.240 12.240 - Btg 25,000 306,000 - 306,000 -
3.10 Ringbalk 20 x 25 ( RB1 )
* Beton
- Semen portland 211.200 211.200 Kg 1,340 283,008 - - 283,008
- Pasir Beton 0.313 0.313 M³ 306,000 95,865 - - 95,865
- Batu pecah 2/3 cm 0.458 0.458 M³ 591,000 270,809 - - 270,809
* Pembesian
- Besi beton Polos Ø 12 45.302 45.302 Kg 15,840 717,600 - - 717,600
- Besi beton Polos Ø 8 26.514 26.514 Kg 15,823 419,532 - - 419,532
- Kawat beton 1.026 1.026 Kg 23,000 23,597 - - 23,597
* Bekisting
- Kayu Kls. III - - - M³ 2,800,000 - - - -
- Paku biasa 2" - 5" 0.800 0.800 Kg 22,000 17,600 - - 17,600
- Balok Kayu Kls. II 0.036 - 0.036 M³ 2,800,000 100,800 - - 100,800
- Tripleks 9 mm 0.700 0.700 Lbr 110,000 77,000 - - 77,000
- Bambu 4.000 4.000 - Btg 25,000 100,000 - 100,000 -
3.10 Ringbalk 20 x 25 ( RB2 )
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5 3 4 5 6 7 8=2x7 9=3x7 10=4x7 11=5x7
* Beton
- Semen portland 156.640 156.640 Kg 1,340 209,898 - - 209,898
- Pasir Beton 0.232 0.232 M³ 306,000 71,100 - - 71,100
- Batu pecah 2/3 cm 0.340 0.340 M³ 591,000 200,850 - - 200,850
* Pembesian
- Besi beton Polos Ø 12 33.744 33.744 Kg 15,840 534,509 - - 534,509
- Besi beton Polos Ø 8 19.665 19.665 Kg 15,823 311,153 - - 311,153
- Kawat beton 0.763 0.763 Kg 23,000 17,549 - - 17,549
* Bekisting
- Kayu Kls. III - - - M³ 2,800,000 - - - -
- Paku biasa 2" - 5" 0.445 0.445 Kg 22,000 9,790 - - 9,790
- Balok Kayu Kls. II 0.020 - 0.020 M³ 2,800,000 56,070 - - 56,070
- Tripleks 9 mm 0.389 0.389 Lbr 110,000 42,831 - - 42,831
- Bambu 2.225 2.225 - Btg 25,000 55,625 - 55,625 -
3.11 Plat Lantai t. 15 cm
* Beton
- Semen portland 540.672 540.672 Kg 1,340 724,500 - - 724,500
- Pasir Beton 0.802 0.802 M³ 306,000 245,415 - - 245,415
- Batu pecah 2/3 cm 1.173 1.173 M³ 591,000 693,272 - - 693,272
* Pembesian
- Besi beton Polos Ø 12 157.496 157.496 Kg 15,840 2,494,767 - - 2,494,767
- Kawat beton 2.250 2.250 Kg 23,000 51,749 - - 51,749
* Bekisting
- Kayu Kls. III - - - M³ 2,800,000 - - - -
- Paku biasa 2" - 5" 11.776 11.776 Kg 22,000 259,072 - - 259,072
- Balok Kayu Kls. II 0.442 0.442 M³ 2,800,000 1,236,480 - - 1,236,480
- Tripleks 9 mm 10.304 10.304 Lbr 110,000 1,133,440 - - 1,133,440
- Bambu 117.760 - 117.760 Btg 25,000 2,944,000 - - 2,944,000
3.12 Dinding Beton t. 15 cm
* Beton
- Semen portland 1,554.432 1,554.432 Kg 1,340 2,082,939 - - 2,082,939
- Pasir Beton 2.306 2.306 M³ 306,000 705,570 - - 705,570
- Batu pecah 2/3 cm 3.373 3.373 M³ 591,000 1,993,157 - - 1,993,157
* Pembesian
- Besi beton Polos Ø 12 452.800 452.800 Kg 15,840 7,172,455 - - 7,172,455
- Kawat beton 6.469 6.469 Kg 23,000 148,777 - - 148,777
* Bekisting
- Kayu Kls. III - - - M³ 2,800,000 - - - -
- Paku biasa 2" - 5" 11.776 11.776 Kg 22,000 259,072 - - 259,072
- Balok Kayu Kls. II 0.589 - 0.589 M³ 2,800,000 1,648,640 - - 1,648,640
- Tripleks 9 mm 10.304 10.304 Lbr 110,000 1,133,440 - - 1,133,440
- Bambu 44.160 - 44.160 Btg 25,000 1,104,000 - - 1,104,000
3.13 Plat Atap t. 12 cm
* Beton
- Semen portland 593.155 593.155 Kg 1,340 794,828 - - 794,828
- Pasir Beton 0.880 0.880 M³ 306,000 269,238 - - 269,238
- Batu pecah 2/3 cm 1.287 1.287 M³ 591,000 760,568 - - 760,568
* Pembesian
- Besi beton Polos Ø 10 244.566 244.566 Kg 15,840 3,873,979 - - 3,873,979
- Kawat beton 3.494 3.494 Kg 23,000 80,357 - - 80,357
* Bekisting
- Kayu Kls. III - - - M³ 2,800,000 - - - -
- Paku biasa 2" - 5" 1.651 1.651 Kg 22,000 36,332 - - 36,332
- Balok Kayu Kls. II 0.083 - 0.083 M³ 2,800,000 231,203 - - 231,203
- Tripleks 9 mm 1.445 1.445 Lbr 110,000 158,952 - - 158,952
- Bambu 24.772 - 24.772 Btg 25,000 619,294 - - 619,294
3.14 Balok Profil
* Beton
- Semen portland 410.911 410.911 Kg 1,340 550,620 - - 550,620
- Pasir Beton 0.610 0.610 M³ 306,000 186,516 - - 186,516
- Batu pecah 2/3 cm 0.892 0.892 M³ 591,000 526,887 - - 526,887
* Pembesian
- Besi beton Polos Ø 10 33.671 33.671 Kg 15,840 533,352 - - 533,352
- Kawat beton 0.481 0.481 Kg 23,000 11,063 - - 11,063
* Bekisting
- Kayu Kls. III - - - M³ 2,800,000 - - - -
- Paku biasa 2" - 5" 1.467 1.467 Kg 22,000 32,269 - - 32,269
- Balok Kayu Kls. II 0.066 - 0.066 M³ 2,800,000 184,814 - - 184,814
- Tripleks 6 mm 1.283 1.283 Lbr 110,000 141,177 - - 141,177
- Bambu 7.334 7.334 - Btg 25,000 183,347 - 183,347 -
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5 3 4 5 6 7 8=2x7 9=3x7 10=4x7 11=5x7
D. PEKERJAAN DINDING
4.1 Pas.Batu Merah 1/2 (1:2)
- Bata merah 781.900 781.900 Bh Err:509 Err:509 Err:509 Err:509 Err:509
- Semen Portland 211.672 211.672 Kg 1,340 283,640 - - 283,640
- Pasir pasang 0.424 0.424 m³ Err:509 Err:509 Err:509 Err:509 Err:509
4.2. Pas. Rooster
- Rooster 6.000 6.000 Bh Err:509 Err:509 Err:509 Err:509 Err:509
- Semen Portland 2.200 2.200 Kg 1,340 2,948 - - 2,948
- Pasir pasang 0.007 0.007 M³ Err:509 Err:509 Err:509 Err:509 Err:509
C. PEKERJAAN PINTU
3.1. Pekerjaan Pintu dan Jendela
- Kusen Pintu 1.000 1.000 Bh Err:509 Err:509 Err:509 Err:509 Err:509
- Kusen Jendela 1.000 1.000 Bh Err:509 Err:509 Err:509 Err:509 Err:509
- Daun Pintu 1.000 1.000 Bh Err:509 Err:509 Err:509 Err:509 Err:509
- Kaca 5mm 0.362 0.362 m2 Err:509 Err:509 Err:509 Err:509 Err:509
- Engsel Kupu kupu 3.000 3.000 Bh Err:509 Err:509 Err:509 Err:509 Err:509
- Kunci Tanam 1.000 1.000 Bh Err:509 Err:509 Err:509 Err:509 Err:509
3.2. Pengecatan Bidang Kayu baru
- Cat meni 1.232 1.232 Kg Err:509 Err:509 Err:509 Err:509 Err:509
- Plamir Kayu 0.924 0.924 Kg Err:509 Err:509 Err:509 Err:509 Err:509
- Cat dasar 1.047 1.047 Kg Err:509 Err:509 Err:509 Err:509 Err:509
- Cat penutup 2 kali 1.602 1.602 Kg Err:509 Err:509 Err:509 Err:509 Err:509
E. PEKERJAAN FINISHING
5.1 Plesteran
- Semen Portland 2,017.642 2,017.642 Kg 1,340 2,703,640 - - 2,703,640
- Pasir pasang 7.760 7.760 M³ Err:509 Err:509 Err:509 Err:509 Err:509
5.2 Acian
- Semen Portland 788.141 788.141 Kg 1,340 1,056,109 - - 1,056,109
5.3 Pekerjaan Man Hole 80 x 80
- Penutup Man Hole Besi Plat 80 x 80 1.000 1.000 Ls 300,000 300,000 - - 300,000
5.4 Pipa Vent Gip Ø 2"
- Pipa Vent Gip Ø 2" 1.000 1.000 Ls 150,000 150,000 - - 150,000
5.5 Pengecatan
- Plamir tembok 24.251 24.251 Kg 9,000 218,255 - - 218,255
- Cat dasar 24.251 24.251 Kg 105,000 2,546,303 - - 2,546,303
- Cat tembok 63.051 63.051 Kg 105,000 6,620,387 - - 6,620,387
5.6 Tangga Monyet
Tangga Monyet Pipa GIP Ø ¾" 1.000 1.000 Ls 2,000,000 2,000,000 - - 2,000,000
F. PEKERJAAN PIPA
- Pipa inlet GIP Ø 1 1/2" Medium A 2.000 2.000 Btg 720,000 1,440,000 - - 1,440,000
- Pipa outlet GIP Ø 3" Medium A 3.000 3.000 Btg 650,000 1,950,000 - - 1,950,000
- Pipa penguras GIP Ø 1 1/2" Medium A 2.000 2.000 Btg 720,000 1,440,000 - - 1,440,000
- Pipa peluap GIP Ø 1 1/2" Medium A 2.000 2.000 Btg 720,000 1,440,000 - - 1,440,000
- Gate valve GIP Ø 3" 2.000 2.000 Bh 585,000 1,170,000 - - 1,170,000
- Gate valve GIP Ø 1 1/2" 2.000 2.000 Bh 210,000 420,000 - - 420,000
- Knee 90° GIP Ø 3" 4.000 4.000 Bh 80,000 320,000 - - 320,000
- Knee 90° GIP Ø 1 1/2" 6.000 6.000 Bh 16,500 99,000 - - 99,000
- Knee 90° PVC Ø 3" 4.000 4.000 Bh 35,000 140,000 - - 140,000
- Socket GIP Ø 3" 2.000 2.000 Bh 63,500 127,000 - - 127,000
- Socket GIP Ø 1 1/2" 3.000 3.000 Bh 15,000 45,000 - - 45,000
- Sock Drat Luar PVC SNI Ø 3" 6.000 6.000 Bh 125,000 750,000 - - 750,000
- Sock Drat luar PVC SNI Ø 1 1/2" 2.000 2.000 Bh 15,000 30,000 - - 30,000
- Tee PVC Ø 3" - Bh 176,500 - - - -
- Lem Pipa 1.000 1.000 Klg 50,000 50,000 - - 50,000
- Seal Tape 5.000 5.000 Bh 5,500 27,500 - - 27,500
- Cat Meni Besi 2.000 2.000 Kg 50,000 100,000 - - 100,000
- Cat Besi 4.000 4.000 Kg 55,000 220,000 - - 220,000
G. PEKERJAAN BOX VALVE
7.1 Pasir Urug
- Pasir Urug 0.054 0.054 m³ 242,000 13,068 - - 13,068
7.2 Pas. Batu 1/2 Bata 1:4
- Bata merah 5 x 11 x 22 cm 268.800 268.800 Bh Err:509 Err:509 Err:509 Err:509 Err:509
- Semen Portland 72.768 72.768 Kg 1,340 97,509 - - 97,509
- Pasir pasang 0.146 0.146 M³ Err:509 Err:509 Err:509 Err:509 Err:509
7.3 Pek. Plesteran 1:2
- Semen Portland 63.898 63.898 Kg 1,340 85,623 - - 85,623
- Pasir pasang 0.246 0.246 M³ Err:509 Err:509 Err:509 Err:509 Err:509
7.4 Penutup Box Valve 60 x 60
- Penutup Man Hole Besi Plat 60 x 70 1.000 1.000 Ls 250,000 250,000 - - 250,000
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5 3 4 5 6 7 8=2x7 9=3x7 10=4x7 11=5x7
Sub Total 1) Err:509 Err:509 Err:509 Err:509
Dibulatkan Err:509 Err:509 Err:509 Err:509
2 UPAH
A. PEKERJAAN PENDAHULUAN
1.1 Membersihkan Lapangan dan Peralatan
- Pekerja 2.100 2.100 - Hok 66,500 139,650 - 139,650 -
1.2 Pemasangan Bowplank
- Pekerja 1.280 1.280 - Hok 66,500 85,120 - 85,120 -
- Tukang 1.280 1.280 - Hok 81,200 103,936 - 103,936 -
B. PEKERJAAN TANAH
2.1 Galian Tanah
- Pekerja 0.918 0.918 - Hok 66,500 61,047 - 61,047 -
2.2 Urugan Pasir
- Pekerja 0.367 0.367 - Hok 66,500 24,419 - 24,419 -
2.3 Urugan Kembali
- Pekerja 0.306 0.306 - Hok 66,500 20,349 - 20,349 -
C. PEKERJAAN BETON
3.1 Lantai Kerja
- Pekerja 1.010 1.010 - Hok 66,500 67,152 - 67,152 -
- Tukang 0.168 0.168 - Hok 81,200 13,666 - 13,666 -
3.2 Rabat Beton Lantai Dasar 10 cm
- Pekerja 0.449 0.449 - Hok 66,500 29,873 - 29,873 -
- Tukang 0.075 0.075 - Hok 81,200 6,079 - 6,079 -
3.3 Pondasi Poor Plat 1,5 x 1,5
* Beton
- Pekerja 5.198 5.198 - Hok 66,500 345,634 - 345,634 -
- Tukang 0.866 0.866 - Hok 81,200 70,340 - 70,340 -
* Pembesian
- Pekerja 1.842 1.842 - Hok 66,500 122,509 - 122,509 -
- Tukang 1.842 1.842 - Hok 81,200 149,589 - 149,589 -
* Bekisting
- Pekerja 4.992 4.992 - Hok 66,500 331,968 - 331,968 -
- Tukang 2.496 2.496 - Hok 81,200 202,675 - 202,675 -
3.4 Kolom 30x30
* Beton
- Pekerja 5.346 5.346 - Hok 66,500 355,509 - 355,509 -
- Tukang 0.891 0.891 - Hok 81,200 72,349 - 72,349 -
* Pembesian
- Pekerja 3.314 3.314 - Hok 66,500 220,383 - 220,383 -
- Tukang 3.314 3.314 Hok 81,200 269,099 - - 269,099
* Bekisting
- Pekerja 9.504 9.504 - Hok 66,500 632,016 - 632,016 -
- Tukang 4.752 4.752 Hok 81,200 385,862 - - 385,862
3.5 Kolom 20x20 K2
* Beton
- Pekerja 0.607 0.607 - Hok 66,500 40,379 - 40,379 -
- Tukang 0.101 0.101 - Hok 81,200 8,217 - 8,217 -
* Pembesian
- Pekerja 0.357 0.357 - Hok 66,500 23,754 - 23,754 -
- Tukang 0.357 0.357 - Hok 81,200 29,005 - 29,005 -
* Bekisting
- Pekerja 1.619 1.619 - Hok 66,500 107,677 - 107,677 -
- Tukang 0.859 0.859 Hok 81,200 69,724 - - 69,724
3.6 Kolom 15x15 KP
* Beton
- Pekerja 0.232 0.232 - Hok 66,500 15,405 - 15,405 -
- Tukang 0.039 0.039 - Hok 81,200 3,135 - 3,135 -
* Pembesian
- Pekerja 0.220 0.220 - Hok 66,500 14,631 - 14,631 -
- Tukang 0.440 0.220 0.220 Hok 81,200 35,730 - 17,865 17,865
* Bekisting
- Pekerja 0.618 0.618 - Hok 66,500 41,081 - 41,081 -
- Tukang 0.618 0.618 Hok 81,200 50,162 - - 50,162
3.7 Balok 20 x 30 (B2)
* Beton
- Pekerja 2.930 2.930 - Hok 66,500 194,872 - 194,872 -
- Tukang 0.488 0.488 - Hok 81,200 39,658 - 39,658 -
* Pembesian
- Pekerja 2.182 2.182 - Hok 66,500 145,101 - 145,101 -
- Tukang 2.182 2.182 Hok 81,200 177,176 - - 177,176
* Bekisting
- Pekerja 5.210 5.210 - Hok 66,500 346,438 - 346,438 -
- Tukang 2.605 2.605 - Hok 81,200 211,510 - 211,510 -
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5 3 4 5 6 7 8=2x7 9=3x7 10=4x7 11=5x7
3.8 Balok 20 x 35 ( B1 )
* Beton
- Pekerja 1.386 1.386 - Hok 66,500 92,169 - 92,169 -
- Tukang 0.231 0.231 - Hok 81,200 18,757 - 18,757 -
* Pembesian
- Pekerja 0.940 0.940 - Hok 66,500 62,533 - 62,533 -
- Tukang 0.940 0.940 Hok 81,200 76,356 - - 76,356
* Bekisting
- Pekerja 3.564 3.564 - Hok 66,500 237,006 - 237,006 -
- Tukang 1.782 1.782 Hok 81,200 144,698 - - 144,698
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5 3 4 5 6 7 8=2x7 9=3x7 10=4x7 11=5x7
3.9 Sloef 20 x 30 ( S1 )
* Beton
- Pekerja 1.515 1.515 - Hok 66,500 100,728 - 100,728 -
- Tukang 0.252 0.252 - Hok 81,200 20,499 - 20,499 -
* Pembesian
- Pekerja 1.299 - 1.299 Hok 66,500 86,384 - - 86,384
- Tukang 1.299 1.299 Hok 81,200 105,479 - - 105,479
* Bekisting
- Pekerja 4.039 4.039 - Hok 66,500 268,607 - 268,607 -
- Tukang 2.020 2.020 Hok 81,200 163,992 - - 163,992
3.10 Ringbalk 20 x 25 ( RB1 )
* Beton
- Pekerja 0.990 0.990 - Hok 66,500 65,835 - 65,835 -
- Tukang 0.165 0.165 - Hok 81,200 13,398 - 13,398 -
* Pembesian
- Pekerja 0.479 - 0.479 Hok 66,500 31,839 - - 31,839
- Tukang 0.479 0.479 Hok 81,200 38,877 - - 38,877
* Bekisting
- Pekerja 0.990 0.990 - Hok 66,500 65,835 - 65,835 -
- Tukang 0.495 0.495 Hok 81,200 40,194 - - 40,194
3.11 Plat Lantai t. 15 cm
* Beton
- Pekerja 2.534 2.534 - Hok 66,500 168,538 - 168,538 -
- Tukang 0.422 0.422 - Hok 81,200 34,299 - 34,299 -
* Pembesian
- Pekerja 1.050 - 1.050 Hok 66,500 69,823 - - 69,823
- Tukang 1.050 1.050 Hok 81,200 85,258 - - 85,258
* Bekisting
- Pekerja 25.907 12.954 12.954 Hok 66,500 1,722,829 - 861,414 861,414
- Tukang 6.477 6.477 - Hok 81,200 525,916 - 525,916 -
3.12 Dinding Beton t. 15 cm
* Beton
- Pekerja 7.286 7.286 - Hok 66,500 484,546 - 484,546 -
- Tukang 1.214 1.214 - Hok 81,200 98,609 - 98,609 -
* Pembesian
- Pekerja 3.019 3.019 - Hok 66,500 200,741 - 200,741 -
- Tukang 3.019 3.019 - Hok 81,200 245,116 - 245,116 -
* Bekisting
- Pekerja 12.954 12.954 - Hok 66,500 861,414 - 861,414 -
- Tukang 6.477 6.477 - Hok 81,200 525,916 - 525,916 -
3.13 Plat Atap t. 12 cm
* Beton
- Pekerja 2.780 2.780 - Hok 66,500 184,898 - 184,898 -
- Tukang 0.463 - 0.463 Hok 81,200 37,628 - - 37,628
* Pembesian
- Pekerja 1.630 - 1.630 Hok 66,500 108,424 - - 108,424
- Tukang 1.630 1.630 - Hok 81,200 132,392 - 132,392 -
* Bekisting
- Pekerja 3.633 - 3.633 Hok 66,500 241,607 - - 241,607
- Tukang 1.817 1.817 Hok 81,200 147,508 - - 147,508
3.14 Balok Profil
* Beton -
- Pekerja 1.926 - 1.926 Hok 66,500 128,089 - - 128,089
- Tukang 0.321 - 0.321 Hok 81,200 26,067 - - 26,067
* Pembesian
- Pekerja 0.224 - 0.224 Hok 66,500 14,927 - - 14,927
- Tukang 0.224 0.224 Hok 81,200 18,227 - - 18,227
* Bekisting
- Pekerja 2.420 2.420 - Hok 66,500 160,942 - 160,942 -
- Tukang 1.210 1.210 - Hok 81,200 98,259 - 98,259 -
D. PEKERJAAN DINDING
4.1 Pas.Batu Merah 1/2 (1:2)
- Pekerja 3.351 - 3.351 Hok 66,500 222,842 - - 222,842
- Tukang 1.117 1.117 Hok 81,200 90,700 - - 90,700
4.2. Pas. Rooster
- Pekerja 0.060 - 0.060 Hok 66,500 3,990 - - 3,990
- Tukang 0.020 0.020 Hok 81,200 1,624 - - 1,624
E. PEKERJAAN PINTU DAN JENDELA
3.2 Pengecatan Bidang Kayu baru
- Pekerja 0.431 0.431 - Hok 66,500 28,675 - 28,675 -
- Tukang 0.055 0.055 - Hok 81,200 4,502 - 4,502 -
E. PEKERJAAN FINISHING
5.1 Plesteran
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5 3 4 5 6 7 8=2x7 9=3x7 10=4x7 11=5x7
- Pekerja 97.002 - 97.002 Hok 66,500 6,450,633 - - 6,450,633
- Tukang 48.501 - 48.501 Hok 81,200 3,938,281 - - 3,938,281
5.2 Acian
- Pekerja 48.501 48.501 - Hok 66,500 3,225,317 - 3,225,317 -
- Tukang 24.251 24.251 - Hok 81,200 1,969,141 - 1,969,141 -
5.5 Pengecetan
- Pekerja 4.850 - 4.850 Hok 66,500 322,532 - - 322,532
- Tukang 15.278 15.278 - Hok 81,200 1,240,559 - 1,240,559 -
F. PEKERJAAN PIPA
6.1 Pek. Pipa GIP
- Pekerja 4.212 4.212 - Hok 66,500 280,098 - 280,098 -
- Tukang 7.020 - 7.020 Hok 81,200 570,024 - - 570,024
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5 3 4 5 6 7 8=2x7 9=3x7 10=4x7 11=5x7
G. PEKERJAAN BOX VALVE
7.1 Galian Tanah
- Pekerja 0.608 - 0.608 Hok 66,500 40,399 - - 40,399
7.2 Urugan Tanah -
- Pekerja 0.051 0.051 - Hok 66,500 3,367 - 3,367 -
7.3 Pas. Batu 1/2 bata 1:4
- Pekerja 1.152 1.152 - Hok 66,500 76,608 - 76,608 -
- Tukang 0.384 0.384 - Hok 81,200 31,181 - 31,181 -
7.4 Plesteran 1:2
- Pekerja 3.072 3.072 - Hok 66,500 204,288 - 204,288 -
- Tukang 1.536 1.536 - Hok 81,200 124,723 - 124,723 -
Sub Total 2) 32,047,518 - 17,009,815 15,037,703
Dibuatkan 32,047,500 - 17,009,800 15,037,700
Jumlah Total) Err:509 Err:509 Err:509 Err:509
Ketua DPMU Kabupaten Wajo KKM "ALELEBBAE" Fasilitator Masyarakat Pelaksana Pamsimas
Jenis Kegiatan : Pembangunan Sarana Air Minum Sub pekerjaan/Kegiatan : Pengeboran Air Tanah Dalam
Nomor RAB : 03 Ukuran / Dimensi : 65 Meter
Lokasi Kegiatan : Desa Tosora Kabupaten : Wajo
HARGA SATUAN TOTAL HARGA
NO URAIAN VOLUME SATUAN
Rp Rp
1 PENGADAAN APD
1 Pengadaan Masker Untuk Tukang dan Pekerja 8 Bh 10,000 80,000
2 Pengadaan Kaos Tangan Untuk Tukang dan Pekerja 8 Bh 10,000 80,000
160,000
1. PEKERJAAN GEOLISTRIK 1 Ls 3,000,000.00 3,000,000.00
SUB TOTAL 1 3,000,000.00
2. PENGADAAN BAHAN
1 Pengadaan Pipa blank dan Pipa Screen PVC AW Ø 6'' 70 M' 155,000 10,850,000.00
2 Pengadaan dop PVC Ø 6 " 1 Bh 120,000 120,000.00
3 Pengadaan dan pemasangan tutup sumur Ø 6'' 1 Bh 2,000,000 2,000,000.00
4 Pengadaan gravel pack 1 M3 591,000 591,000.00
Ketua DPMU Kabupaten Wajo KKM "PUNCAK" Fasilitator Masyarakat Pelaksana Pamsimas
Jenis Kegiatan/Pekerjaan
Jumlah Harga Satuan Total Harga
NO. Jenis dan Assesoris Pipa
Transmisi Distribusi PIPA APBDES Res. PMA (Btg/Bh) (Rp.) (Rp.)
-
Disetujui Oleh : Didampingi oleh : Dibuat Oleh :
Ketua DPMU Kabupaten Wajo KKM "ALELEBBAE" Fasilitator Masyarakat Pelaksana Pamsimas
PEK. TANAH
1 Galian Pondasi
1.5 0.45 0.55 2 0.7425
1.2 0.45 0.55 2 0.594
TOT 1.3365
2 Urugan pasir
1.5 0.45 0.05 2 0.0675
1.2 0.45 0.05 2 0.054
1.13 1.13 0.05 1 0.063845
0.185345
3 Lantai kerja 10 cm
1.2 1.2 0.1 1 0.144
PEK. BETON
5 Sloof 15/15
1.5 0.15 0.15 2 0.0675
1.2 0.15 0.15 2 0.054
TOT 0.1215
6 Kolom 15 x 15
0.15 0.15 1.73 2 0.07785
0.15 0.15 1.95 2 0.08775
TOT 0.1656
7 Ringbalk 15x15
1.5 0.15 0.15 2 0.0675
1.22 0.15 0.15 2 0.0549
TOT 0.1224
8 Dinding
1.2 1.9 2 4.56
1.2 1.73 1 2.076
0.3 0.15 1 0.045
1.2 1.95 1 2.34
1.95 0.78 1 1.521
TOT 7.41
14 PEK. PLESTERAN
14.82
kolom 0.519 0.585 1.104
Ringbalk 0.45 0.366 0.816
TOT 16.74
TOT 3.12
PEK. ATAP
14 GORDING
0.05 2.05 0.07 3 0.021525
15 KASO
0.05 2.2 0.07 3 0.0231
P L T
1 Kolom 20 x 20
0.2 0.2 1.8 2 0.144
0.2 0.2 2.6 1 0.104
TOT 0.248
6 Ringbalk 15/15
0.15 0.15 1.5 0
0.15 0.15 1.4 0
TOT 0
TOT 2.88
15 KASO
0.05 1.67 0.07 3 0.017535
16 LISTPLANK
4.17
17 PLAFOND
2.73 2.97 1 8.1081
0.6 2.97 1 1.782
TOT
18 PAS. SENG
2.5 1.67 1 4.175
PEK. TANAH
1 Galian Pondasi 1.2 1.2 2 4 11.52
PEK. BETON
5 Poer plat
1.2 1.2 0.5 4 2.88
Kolom bak 20 x 20
0.2 0.2 2.5 6 0.6
8 Sloof/ringbalk 20 x 30
0.2 2.4 0.3 16 2.304
0
TOT 2.304
9 Ringbalk 20 x 20
0.2 2.4 0.2 2 0.192
10 Plat bawah t = 20 cm
2.4 2.4 0.2 1 1.152
TOT 1.152
12 Dinding bak
2.4 0.2 2.5 4 4.8
0
TOT 4.8
15 PEK. PLESTERAN
a Kolom 30 x 30
0.3 4 16 19.2
0.2 0.4 32 2.56
TOT 16.64
b Sloof/ringbalk
2.6 0.4 12 12.48
2.6 0.2 12 6.24
0.2 0.2 4 0.16
TOT 18.56
HARGA HARGA
SATUAN VOLUME SATUAN TOTAL
( Rp ) ( Rp )
GIP Ø 1" M 9.81 35,833 351,525
Ongkos Kerja (Pengelasan) Ls 1.00 500,000 500,000
TOTAL
DIBULATKAN
PEK. TANAH
1 Galian 0.5 0.5 0.6 3 0.45
cm Batang
Pjg pipa 2" 2" AKSESORIS
GIP Trans 8 Transmisi
Distribusi 14
6.82
penguras 0.5
Distribusi
PVC Trans 0.5
Distribusi 1
penguras 0.5
3.06
HARGA
TOTAL
( Rp )
351,525
500,000
851,525
851,500
TOTAL AKSESORIS
Knee gip 2" 1 Knee gip 2" 4
Socket 2" 1 Socket 2" 4
Drat dalam 1 Drat dalam 4
Gate valve 3
Knee gip 2" 2 Knee PVC 2" 3
Socket 2" 2 Pek. Drat 12
Drat dalam 2
Gate valve 2
Knee PVC 2" 2
Batang
Biaya (Rp)
APBN
11=5x7
640,000
-
640,000
112,000
40,000
350,000
300,000
-
81,000
448,000
185,000
30,000
1,546,000
2,186,000
2,186,000
mattirowalie juni 2020
Pelaksana Pamsimas
#REF!
RENCANA ANGGARAN BIAYA
Jenis Kegiatan : Pembangunan Sarana Air Minum Sub pekerjaan/Kegiatan : Pengeboran Air Tanah Dalam
Nomor RAB : 03 Ukuran / Dimensi : 40 Meter
Lokasi Kegiatan : Desa Sappa Kabupaten : Wajo
HARGA SATUAN TOTAL HARGA
NO URAIAN VOLUME SATUAN
Rp Rp
1 PENGADAAN APD
1 Pengadaan Masker Untuk Tukang dan Pekerja Bh 10,000 -
2 Pengadaan Kaos Tangan Untuk Tukang dan Pekerja Bh 10,000 -
-
1. PEKERJAAN GEOLISTRIK 1 Ls 3,000,000.00 3,000,000.00
SUB TOTAL 1 3,000,000.00
2. PENGADAAN BAHAN
1 Pengadaan Pipa blank dan Pipa Screen PVC AW Ø 4'' 35 M' 73,000 2,555,000.00
2 Pengadaan dop PVC Ø 4" 1 Bh 100,000 100,000.00
3 Pengadaan dan pemasangan tutup sumur Ø 4'' 1 Bh 1,000,000 1,000,000.00
4 Pengadaan gravel pack 0.5 M3 300,000 150,000.00
Ketua DPMU Kabupaten Wajo KKM "PUNCAK" Fasilitator Masyarakat Pelaksana Pamsimas
Volume
Kebutuha
s/d tahap
yang lalu
Realisasi
No Uraian Pekerjaan
n
1 PENGADAAN APD
Pengadaan Masker Untuk Tukang dan Pekerja 18.00
Pengadaan Kaos Tangan Untuk Tukang dan Pekerja 18.00
Pengadaan Termometer Gun 1.00
Pengadaan Desinfektan 3.00
2 RESERVOIR
Bambu 72
Batu pecah 2/3 cm 11
Besi beton Polos Ø 10 5
Besi beton Polos Ø 12 22
Besi beton Polos Ø 14 80
Besi beton Polos Ø 8 59
Kawat beton 26.00
Paku biasa 2" - 5" 20.285
Pasir beton 14
Pasir pasang 8
Pasir urug 1
Semen Portland 132
Tripleks 6 mm 0
Tripleks 9 mm 17
upah
pekerja 161
tukang 49
3 GARDU LISTRIK
Paku biasa 2" - 5" 1
Pasir urug 1
Batu belah 15/20 cm 2
Semen Portland 10
Pasir pasang 2
Pasir Beton 0.224
Batu pecah 2/3 cm 0.158
Kayu terentang 2
Besi beton polos 8
Besi beton Polos Ø 10 5
Kawat beton 3.50
Koral beton 0.866
Kusen Pintu 1
Engsel Kupu kupu 3
Kunci Tanam 1
Bata merah 711
Daun Pintu 1
4 CPTS
Pasir Urug 1
Batu Kali 1
Semen Portland 8
Pasir Pasang 1
Pasir beton 1
Koral beton 1
Kayu terentang 1
Paku biasa 2" - 5' 0.3075
Besi beton polos 5
Kawat beton 0.00
Bata merah 5 x 11 x 22 cm 110
Pipa PVC Ø 1/2" 8
Sok Drak Luar 1/2" 1
Knee 1/2" 2
Stop Kran Air Ø 1/2" 1
Seal Type 1
Wastafel 1
Pipa PVC Ø 1" 1
Besi hollow 4 x 4 mm 21
Pengelasan 21
Besi Siku 19
Tangki Air 250 Liter 1
Batu Kerikil Sungai 0.0975
5 BOR
PENGADAAN APD
Pengadaan Masker Untuk Tukang dan Pekerja 0
Pengadaan Kaos Tangan Untuk Tukang dan Pekerja 0
1. PEKERJAAN GEOLISTRIK 1
2. PENGADAAN BAHAN
Pengadaan Pipa blank dan Pipa Screen PVC AW Ø 4'' 35
Pengadaan dop PVC Ø 4" 1
Pengadaan dan pemasangan tutup sumur Ø 4'' 1
Pengadaan gravel pack 0.5
6 POMPA
I. BAHAN
- Pompa (Reservoir)
1.1 Submersible Pump (SP) 1
- Kapasitas 0,75 - 1,2 Ltr/s
- Head 100 m
- Diameter pipa Outlet 11/2"
- Daya 2200 watt
1.2 Control Panel 1
1.4 Kabel Otomatis Pompa 1
Otomatis Pompa 1
Drop Cable Water level Control 1
1.5 2. UPAH
Biaya Pemasangan Pompa 1
LISTRIK PLN
1. BAHAN
- INSTALASI JARINGAN LISTRIK PLN
Biaya Penyambungan (BP) 1
Biaya Surat Jaminan Instalasi (SJI) 1
Biaya Gambar 1
Sertifikat Layak Operasi (SLO) 1
Cable 2x16 mm 80
2. UPAH
Pemasangan Instalasi 1
B. Transportasi Kegiatan
1 Transportasi pencairan dana Bank 2 0
2 Transportasi Konsultasi ke DPMU 3 0
3 Transporasi kegiatan lapangan dll 4 0
Total (A+B+C+D)
2 KEGIATAN PENGUATAN KELEMBAGAAN
A. Pelatihan Administrasi & Keuangan
1 Ballpoint 5 0
2 Buku tulis/block note 5 0
3 Spidol 1 0
4 Kertas plano 4 0
5 Fotocopy Modul 150 0
6 Handzanitizer 1 0
7 Masker kain 5 0
8 Spanduk pelatihan 1 0
9 Nasi Dos/snack 5 0
B. Pelatihan Teknik
1 Ballpoint 5 0
2 Buku tulis/block note 5 0
3 Spidol 1 0
4 Kertas plano 5 0
5 Fotocopy Modul 150 0
6 Handsanitizer 1 0
7 Masker kain 5 0
8 Nasi Dos/snack 5 0
C. Pelatihan Kesehatan
1 Ballpoint 5 0
2 Buku tulis/block note 5 0
3 Spidol 1 0
4 Kertas plano 5 0
5 Fotocopy Modul 150 0
6 Handsanitizer 1 0
7 Masker kain 5 0
8 Spanduk pelatihan 1 0
9 Nasi Dos/snack 5
Total (A+B+C)
3 KEGIATAN KESEHATAN
A. Penyuluhan PHBS Masyarakat
1 Spidol 1 0
2 Lakban Kertas 1 0
3 Gambar Poster kesehatan 2 0
C. Simulasi CTPS
Ember Berkran 1 0
Sabun Cuci tangan 1 0
Lap Tangan 1 0
F. Simulasi CTPS
1 Ember berkran 1 0
2 Sabun Cuci Tangan 1 0
3 Lap Tangan 1 0
Total (A+B+C+D+E+F+G+H)
Disetujui :
Koordinator KKM Puncak
Abd. Hamid
Diperiksa Oleh :
No Nama Selaku
1 Asniati, SKM Fasilitator masyarakat CD
2 Ida Kartini, SKM Fasilitator masyarakat CD
3 Aradea Yusuf,ST District Coordinator
4 Rita Darniati, SE FMS Provinsi
Mengetahui :
RPD :1
Volume
Komulatif
Pengajuan
Jumlah
Sekarang
unit /
Sisa Harga Satuan Jumlah
Satuan
72 0 bt Rp 31,000 Rp 2,232,000
11 0 m³ Rp 591,000 Rp 6,501,000
20 -15 btg Rp 60,000 Rp 1,200,000
50 -28 btg Rp 85,000 Rp 4,250,000
80 0 btg Rp 135,000 Rp 10,800,000
59 0 btg Rp 40,000 Rp 2,360,000
34.05 -8.05 kg Rp 23,000 Rp 783,035
20.285 0 kg Rp 22,000 Rp 446,270
14 0 m³ Rp 306,000 Rp 4,284,000
8 0 m³ Rp 242,000 Rp 1,936,000
1 0 m³ Rp 242,000 Rp 242,000
132 0 zak Rp 65,000 Rp 8,580,000
0 0 Rp 80,000 Rp -
17 0 Rp 110,000 Rp 1,870,000
Rp 45,484,305
30 100,000 Rp 3,000,000
20 120,000 Rp 2,400,000
Rp 5,400,000
1 Rp 22,000 Rp 22,000
1 Rp 242,000 Rp 242,000
2 Rp 395,000 Rp 790,000
10 Rp 65,000 Rp 650,000
2 Rp 242,000 Rp 484,000
0.224 Rp 306,000 Rp 68,544
0.158 Rp 505,000 Rp 79,790
2 Rp 26,000 Rp 52,000
8 Rp 40,000 Rp 320,000
5 Rp 60,000 Rp 300,000
3.4975 Rp 23,000 Rp 80,443
0.866 Rp 591,000 Rp 511,806
1 Rp 668,000 Rp 668,000
3 Rp 39,000 Rp 117,000
1 Rp 223,000 Rp 223,000
711 Rp 1,000 Rp 711,000
1 Rp 757,000 Rp 757,000
Rp 6,076,583
1 Rp 242,000 Rp 242,000
1 Rp 395,000 Rp 395,000
8 Rp 65,000 Rp 520,000
1 Rp 242,000 Rp 242,000
1 Rp 306,000 Rp 306,000
1 Rp 613,000 Rp 613,000
1 Rp 40,000 Rp 40,000
0.3075 Rp 6,765 Rp 2,080
5 Rp 40,000 Rp 200,000
0 Rp 22,000 Rp -
110 Rp 1,000 Rp 110,000
8 Rp 17,500 Rp 140,000
1 Rp 2,000 Rp 2,000
2 Rp 2,000 Rp 4,000
1 Rp 25,000 Rp 25,000
1 Rp 5,000 Rp 5,000
1 Rp 815,000 Rp 815,000
1 Rp 40,000 Rp 40,000
21 Rp 18,167 Rp 381,500
21 Rp 1,350 Rp 28,350
19 Rp 20,000 Rp 380,000
1 Rp 500,000 Rp 500,000
0.0975 Rp 613,000 Rp 59,768
Rp 10,101,395
0 10000 0
0 10000 0
sub total 1 0
1 3000000 3000000
sub total 2 3000000
35 73000 2555000
1 100000 100000
1 1000000 1000000
0.5 300000 150000
sub total 3 3805000
35 45000 1575000
35 170000 5950000
1 320000 320000
35 37000 1295000
0.5 50000 25000
1 350000 350000
1 350000 350000
1 480000 480000
24 7000 168000
24 7000 168000
subtotal 4 10681000
total (1+2+3+4) 17486000
1 3700000 3700000
1 2500000 2500000
1 1500000 1500000
1 150000 150000
1 1500000 1500000
1 500000 500000
Rp 9,850,000
1 2712000 2712000
1 1750000 1750000
1 724000 724000
1 100000 100000
80 7,500 600000
1 250,000 250000
total Rp 6,136,000
1 1 5,000 5,000
1 1 12,000 12,000
1 1 25,000 25,000
1 1 10,000 10,000
1 1 30,000 30,000
1 1 20,000 20,000
1 1 20,000 20,000
1 1 30,000 30,000
1 1 20,000 20,000
1 1 30,000 30,000
1 1 20,000 20,000
1 1 20,000 20,000
Sub Total H 242,000
+G+H) 4,795,500
+2+3+4)
111,005,783
a ratus ribu rupiah)
Dibuat :
Ketua Satlak Pamsimas
Muhammad Yahya
Diperiksa Oleh :
n Air Minum
a Permukiman
latan
K, ST )
1 1 001
Rp 11,494,217
Rp 102,254,283
Rp 112,819,500
Rp 10,565,217
Rp 122,500,000
Rp 11,494,217