Anda di halaman 1dari 358

DAFTAR ANALISA

PROGRAM : PAMSIMAS 2
PEKERJAAN : SARANA AIR MINUM DAN SANITASI
LOKASI : DESA ARAJANG / KEC. GILIRENG
TAHUN ANGGARAN : 2013

1. 1 m2 Membersihkan lapangan dan peralatan


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.100 50,000.00 5,000.00
2. Tukang Kayu Hari/Orang - -
3. Kepala Tukang Hari/Orang - -
4. Mandor Hari/Orang 0.050 -
JUMLAH 5,000.00
JUMLAH 5,000.00

2. 1 m' Pengukuran dan pemasangan bouwplank


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.100 50,000.00 5,000.00
2. Tukang Kayu Hari/Orang 0.100 -
3. Kepala Tukang Hari/Orang 0.010 -
4. Mandor Hari/Orang 0.005 -
JUMLAH 5,000.00

B. BAHAN
1. Kayu Klas III uk. 5/7 M3 0.012 1,350,000.00 16,200.00
2. Paku biasa 2" - 5" Kg 0.020 15,000.00 300.00
3. Kayu papan 3/20 M3 0.007 1,350,000.00 9,450.00
JUMLAH 25,950.00
JUMLAH A + B 30,950.00

6.2 1 m3 Galian tanah biasa sedalam 2 meter


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.526 50,000.00 26,300.00
2. Tukang Gali Hari/Orang - - -
3. Kepala Tukang Hari/Orang - - -
4. Mandor Hari/Orang 0.052 - -
JUMLAH A 26,300.00

6.3 1 m3 Galian tanah biasa sedalam 3 meter


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.735 50,000.00 36,750.00
2. Tukang Gali Hari/Orang - - -
3. Kepala Tukang Hari/Orang - - -
4. Mandor Hari/Orang 0.073 - -
JUMLAH A 36,750.00
3. 1 m3 Galian tanah biasa max. sedalam 1 meter
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KOEFISIEN
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.400 50,000.00 20,000.00
2. Tukang Gali Hari/Orang - -
3. Kepala Tukang Hari/Orang - -
4. Mandor Hari/Orang 0.040 -
JUMLAH A 20,000.00

4. 1 m3 Galian tanah keras sedalam 1 meter


SATUAN HARGA SATUAN BIAYA SATUAN
NO. URAIAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.625 50,000.00 31,250.00
2. Tukang Gali Hari/Orang - - -
3. Kepala Tukang Hari/Orang - -
4. Mandor Hari/Orang 0.062 -
JUMLAH A 31,250.00

6.5 1 m3 Galian tanah cadas sedalam 1 meter


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 1.250 50,000.00 62,500.00
2. Tukang Gali Hari/Orang - - -
3. Kepala Tukang Hari/Orang - - -
4. Mandor Hari/Orang 0.125 - -
JUMLAH A 62,500.00

4. 1 m3 Galian tanah lumpur sedalam 1 meter


SATUAN HARGA SATUAN BIAYA SATUAN
NO. URAIAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.823 50,000.00 41,150.00
2. Tukang Gali Hari/Orang - - -
3. Kepala Tukang Hari/Orang - -
4. Mandor Hari/Orang 0.083 -
JUMLAH A 41,150.00

5. 1 m3 Urugan kembali
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.192 50,000.00 9,600.00
2. Tukang Gali Hari/Orang - - -
3. Kepala Tukang Hari/Orang - -
4. Mandor Hari/Orang 0.019 -
JUMLAH A 9,600.00
6. 1 m3 Pemadatan tanah
SATUAN HARGA SATUAN BIAYA SATUAN
NO. URAIAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.500 50,000.00 25,000.00
2. Tukang Gali Hari/Orang - - -
3. Kepala Tukang Hari/Orang - -
4. Mandor Hari/Orang 0.050 -
JUMLAH A 25,000.00
7. 1 m3 Urugan pasir
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.300 50,000.00 15,000.00
2. Tukang Gali Hari/Orang - - -
3. Kepala Tukang Hari/Orang - -
4. Mandor Hari/Orang 0.010 -
JUMLAH A 15,000.00

B. BAHAN
1. Pasir urug M3 1.200 100,000.00 120,000.00
JUMLAH 120,000.00
JUMLAH A + B 135,000.00

8. 1 m3 Urugan kerikil
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.250 50,000.00 12,500.00
2. Tukang Gali Hari/Orang - - -
3. Kepala Tukang Hari/Orang - -
4. Mandor Hari/Orang 0.025 -
JUMLAH A 12,500.00

B. BAHAN
1. Kerikil M3 1.200 137,500.00 165,000.00
JUMLAH 165,000.00
JUMLAH A + B 177,500.00

9. 1 m3 Pemasangan lapisan ijuk


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.150 50,000.00 7,500.00
2. Tukang Gali Hari/Orang - - -
3. Kepala Tukang Hari/Orang - -
4. Mandor Hari/Orang 0.015 -
JUMLAH A 7,500.00

B. BAHAN
1. Ijuk m3 1.200 20,000.00 24,000.00
JUMLAH 24,000.00
JUMLAH A + B 31,500.00

10. 1 m3 Pasang pondasi batu kali, 1 Pc : 3 Ps


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 1.500 50,000.00 75,000.00
2. Tukang Batu Hari/Orang 0.600 75,000.00 45,000.00
3. Kepala Tukang Hari/Orang 0.060 -
4. Mandor Hari/Orang 0.075 -
JUMLAH 120,000.00

B. BAHAN
1. Batu belah 10/15 cm M3 1.100 137,500.00 151,250.00
2. Semen Portland Kg 202.000 1,200.00 242,400.00
3. Pasir pasang M3 0.485 125,000.00 60,625.00
JUMLAH 454,275.00
JUMLAH A + B 574,275.00
10. 1 m3 Pasang pondasi batu kali, 1 Pc : 4 Ps
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 1.500 50,000.00 75,000.00
2. Tukang Batu Hari/Orang 0.600 75,000.00 45,000.00
3. Kepala Tukang Hari/Orang 0.060 -
4. Mandor Hari/Orang 0.075 -
JUMLAH 120,000.00

B. BAHAN
1. Batu belah 10/15 cm M3 1.100 137,500.00 151,250.00
2. Semen Portland Kg 163.000 1,200.00 195,600.00
3. Pasir pasang M3 0.520 125,000.00 65,000.00
JUMLAH 411,850.00
JUMLAH A + B 531,850.00

11. 1 m3 Pasang pondasi batu kosong / anstamping


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.780 50,000.00 39,000.00
2. Tukang Batu Hari/Orang 0.390 75,000.00 29,250.00
3. Kepala Tukang Hari/Orang 0.039 -
4. Mandor Hari/Orang 0.039 -
JUMLAH 68,250.00

B. BAHAN
1. Batu belah 10/15 cm M3 1.200 137,500.00 165,000.00
2. Pasir urug M3 0.300 100,000.00 30,000.00
JUMLAH 195,000.00
JUMLAH A + B 263,250.00

12. 1 m3 Membuat beton tumbuk, 1 Pc : 3 Ps : 5 Kr


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 1.650 50,000.00 82,500.00
2. Tukang Batu Hari/Orang 0.250 75,000.00 18,750.00
3. Kepala Tukang Hari/Orang 0.025 -
4. Mandor Hari/Orang 0.080 -
JUMLAH 101,250.00

B. BAHAN
1. Semen Portland Kg 218.000 1,200.00 261,600.00
2. Pasir beton M3 0.520 125,000.00 65,000.00
3. Koral beton M3 0.870 325,000.00 282,750.00
JUMLAH 609,350.00
JUMLAH A + B 710,600.00
13. 1 m2 Membuat lantai kerja beton tumbuk, 1 Pc : 3 Ps : 5 Kr, tebal 5 cm
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 1.150 50,000.00 57,500.00
2. Tukang Batu Hari/Orang 0.020 75,000.00 1,500.00
3. Kepala Tukang Hari/Orang 0.002 -
4. Mandor Hari/Orang 0.006 -
JUMLAH 59,000.00

B. BAHAN
1. Semen Portland Kg 10.000 1,200.00 12,000.00
2. Pasir beton M3 0.026 125,000.00 3,250.00
3. Koral beton M3 0.044 325,000.00 14,300.00
JUMLAH 29,550.00
JUMLAH A + B 88,550.00

14. 1 m3 Membuat beton bertulang, 1 Pc : 2 Ps : 3 Kr


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 1.650 50,000.00 82,500.00
2. Tukang Batu Hari/Orang 0.250 75,000.00 18,750.00
3. Kepala Tukang Hari/Orang 0.025 -
4. Mandor Hari/Orang 0.080 -
JUMLAH 101,250.00

B. BAHAN
1. Semen Portland Kg 232.000 1,200.00 278,400.00
2. Pasir beton M3 0.520 125,000.00 65,000.00
3. Koral beton M3 0.780 325,000.00 253,500.00
JUMLAH 596,900.00
JUMLAH A + B 698,150.00

15. 1 Kg Pembesian dengan besi polos


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.007 50,000.00 350.00
2. Tukang Besi Hari/Orang 0.007 75,000.00 525.00
3. Kepala Tukang Hari/Orang 0.0007 -
4. Mandor Hari/Orang 0.0003 -
JUMLAH 875.00

B. BAHAN
1. Besi beton polos Kg 1.050 9,000.00 9,450.00
2. Kawat beton Kg 0.015 18,000.00 270.00
JUMLAH 9,720.00
JUMLAH A + B 10,595.00

16. 1 m2 Pasang bekisting untuk pondasi


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.300 50,000.00 15,000.00
2. Tukang Kayu Hari/Orang 0.260 75,000.00 19,500.00
3. Kepala Tukang Hari/Orang 0.026 -
4. Mandor Hari/Orang 0.005 -
JUMLAH 34,500.00

B. BAHAN
1. Kayu terentang M3 0.040 1,350,000.00 54,000.00
2. Paku biasa 2" - 5' Kg 0.300 15,000.00 4,500.00
3. Minyak bekisting Ltr 0.100 - -
JUMLAH 58,500.00
JUMLAH A + B 93,000.00
17. 1 m2 Pasang bekisting untuk sloof
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.300 50,000.00 15,000.00
2. Tukang Kayu Hari/Orang 0.260 75,000.00 19,500.00
3. Kepala Tukang Hari/Orang 0.026 - -
4. Mandor Hari/Orang 0.005 -
JUMLAH 34,500.00

B. BAHAN
1. Kayu terentang M3 0.045 1,350,000.00 60,750.00
2. Paku biasa 2" - 5' Kg 0.300 15,000.00 4,500.00
3. Minyak bekisting Ltr 0.100 - -
JUMLAH 65,250.00
JUMLAH A + B 99,750.00

18. 1 m2 Pasang bekisting untuk kolom


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.300 50,000.00 15,000.00
2. Tukang Kayu Hari/Orang 0.330 75,000.00 24,750.00
3. Kepala Tukang Hari/Orang 0.033 - -
4. Mandor Hari/Orang 0.006 - -
JUMLAH 39,750.00

B. BAHAN
1. Kayu Papan Kls III M3 0.040 1,350,000.00 54,000.00
2. Paku biasa 2" - 5' Kg 0.400 15,000.00 6,000.00
3. Minyak bekisting Ltr 0.200 - -
4. Balok kayu Kls. III M3 0.015 1,350,000.00 20,250.00
5. Plywood tebal 9 mm Lmbr 0.350 45,000.00 15,750.00
6. Bambu Btg 2.000 7,000.00 14,000.00
JUMLAH 110,000.00
JUMLAH A + B 149,750.00

19. 1 m2 Pasang bekisting untuk balok


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.320 50,000.00 16,000.00
2. Tukang Kayu Hari/Orang 0.330 75,000.00 24,750.00
3. Kepala Tukang Hari/Orang 0.033 - -
4. Mandor Hari/Orang 0.006 - -
JUMLAH 40,750.00

B. BAHAN
1. Kayu terentang M3 0.040 1,350,000.00 54,000.00
2. Paku biasa 2" - 5' Kg 0.400 15,000.00 6,000.00
3. Minyak bekisting Ltr 0.200 - -
4. Balok kayu borneo M3 0.018 1,350,000.00 24,300.00
5. Plywood tebal 9 mm Lmbr 0.350 45,000.00 15,750.00
6. Dolken kayu galam Æ 8 - 10/ 4 m Btg 2.000 7,000.00 14,000.00
JUMLAH 114,050.00
JUMLAH A + B 154,800.00
20. 1 m2 Pasang bekisting untuk lantai
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.320 50,000.00 16,000.00
2. Tukang Batu Hari/Orang 0.330 75,000.00 24,750.00
3. Kepala Tukang Hari/Orang 0.033 -
4. Mandor Hari/Orang 0.006 -
JUMLAH 40,750.00

B. BAHAN
1. Kayu terentang M3 0.040 1,350,000.00 54,000.00
2. Paku biasa 2" - 5' Kg 0.400 15,000.00 6,000.00
3. Minyak bekisting Ltr 0.200 - -
4. Balok kayu borneo M3 0.015 1,350,000.00 20,250.00
5. Plywood tebal 9 mm Lmbr 0.350 45,000.00 15,750.00
6. Dolken kayu galam Æ 8 - 10/ 4 m Btg 6.000 7,000.00 -
JUMLAH 96,000.00
JUMLAH A + B 136,750.00

21. 1 m2 Pasang bekisting untuk dinding


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.320 50,000.00 16,000.00
2. Tukang Kayu Hari/Orang 0.330 75,000.00 24,750.00
3. Kepala Tukang Hari/Orang 0.033 -
4. Mandor Hari/Orang 0.006 -
JUMLAH 40,750.00

B. BAHAN
1. Kayu terentang M3 0.030 1,350,000.00 40,500.00
2. Paku biasa 2" - 5' Kg 0.400 15,000.00 6,000.00
3. Minyak bekisting Ltr 0.200 - -
4. Balok kayu borneo M3 0.020 1,350,000.00 27,000.00
5. Plywood tebal 9 mm Lmbr 0.350 45,000.00 15,750.00
6. Dolken kayu galam Æ 8 - 10/ 4 m Btg 3.000 7,000.00 21,000.00
7. Formtie/penjaga jrk bekisting/spacer Buah 4.000 - -
JUMLAH 110,250.00
JUMLAH A + B 151,000.00

22. 1 m2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 2 Ps


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.320 50,000.00 16,000.00
2. Tukang Batu Hari/Orang 0.100 75,000.00 7,500.00
3. Kepala Tukang Hari/Orang 0.010 -
4. Mandor Hari/Orang 0.015 -
JUMLAH 23,500.00

B. BAHAN
1. Bata merah 5 x 11 x 22 cm Bh 70.000 550.00 38,500.00
2. Semen Portland Kg 18.950 1,200.00 22,740.00
3. Pasir pasang M3 0.038 125,000.00 4,750.00
JUMLAH 65,990.00
JUMLAH A + B 89,490.00
22. 1 m2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Ps
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.320 50,000.00 16,000.00
2. Tukang Batu Hari/Orang 0.100 75,000.00 7,500.00
3. Kepala Tukang Hari/Orang 0.010 -
4. Mandor Hari/Orang 0.015 -
JUMLAH 23,500.00

B. BAHAN
1. Bata merah 5 x 11 x 22 cm Bh 70.000 550.00 38,500.00
2. Semen Portland Kg 14.370 1,200.00 17,244.00
3. Pasir pasang M3 0.040 125,000.00 5,000.00
JUMLAH 60,744.00
JUMLAH A + B 84,244.00

23. 1 m2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 4 Ps


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.320 50,000.00 16,000.00
2. Tukang Batu Hari/Orang 0.100 75,000.00 7,500.00
3. Kepala Tukang Hari/Orang 0.010 -
4. Mandor Hari/Orang 0.015 -
JUMLAH 23,500.00

B. BAHAN
1. Bata merah 5 x 11 x 22 cm Bh 70.000 550.00 38,500.00
2. Semen Portland Kg 11.500 1,200.00 13,800.00
3. Pasir pasang M3 0.043 125,000.00 5,375.00
JUMLAH 57,675.00
JUMLAH A + B 81,175.00

24. 1 bh Pasang dinding roaster/terawang ( 12 x 11 x 24 ) cm


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.0083 50,000.00 415.00
2. Tukang Batu Hari/Orang 0.0027 75,000.00 202.50
3. Kepala Tukang Hari/Orang 0.00027 - -
4. Mandor Hari/Orang 0.00042 - -
JUMLAH 617.50

B. BAHAN
1. Roaster / terawang Bh 1.000 25,500.00 25,500.00
2. Semen Portland Kg 0.337 1,200.00 404.16
3. Pasir pasang M3 0.00097 125,000.00 121.25
JUMLAH 26,025.41
JUMLAH A + B 26,642.91

25. 1 m2 Plesteran 1 Pc : 2 Ps, tebal 20 mm


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.250 50,000.00 12,500.00
2. Tukang Batu Hari/Orang 0.200 75,000.00 15,000.00
3. Kepala Tukang Hari/Orang 0.020 -
4. Mandor Hari/Orang 0.0125 -
JUMLAH 27,500.00

B. BAHAN
1. Semen Portland Kg 14.280 1,200.00 17,136.00
2. Pasir pasang M3 0.023 125,000.00 2,875.00
JUMLAH 20,011.00
JUMLAH A + B 47,511.00
26. 1 m2 Plesteran 1 Pc : 4 Ps, tebal 20 mm
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.250 50,000.00 12,500.00
2. Tukang Batu Hari/Orang 0.200 75,000.00 15,000.00
3. Kepala Tukang Hari/Orang 0.020 -
4. Mandor Hari/Orang 0.0125 -
JUMLAH 27,500.00

B. BAHAN
1. Semen Portland Kg 8.680 1,200.00 10,416.00
2. Pasir pasang M3 0.028 125,000.00 3,500.00
JUMLAH 13,916.00
JUMLAH A + B 41,416.00

27. 1 m2 Acian Dinding


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
Pekerja Hari/Orang 0.085 50,000.00 4,250.00
Tukang Batu Hari/Orang 0.05 75,000.00 3,750.00
Kepala Tukang Batu Hari/Orang 0.05
Mandor Hari/Orang 0.043
JUMLAH 8,000.00

B. BAHAN
Semen Portland Kg 5.927 1,200.00 7,112.40
JUMLAH 7,112.40
JUMLAH A + B 15,112.40

28. 1 m2 Pasang lantai keramik ukuran 20 x 20 cm


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.620 50,000.00 31,000.00
2. Tukang Batu Hari/Orang 0.350 75,000.00 26,250.00
3. Kepala Tukang Hari/Orang 0.035 -
4. Mandor Hari/Orang 0.030 -
JUMLAH 57,250.00

B. BAHAN
1. Ubin keramik 20 x 20 cm M² 1.000 45,000.00 45,000.00
2. Semen Portland Kg 11.380 1,200.00 13,656.00
3. Pasir pasang M3 0.042 125,000.00 5,250.00
4. Semen warna Kg 1.500 15,000.00 22,500.00
JUMLAH 86,406.00
JUMLAH A + B 143,656.00

29. 1 m3 Pasang kusen pintu dan jendela kayu kelas II


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )
A. TENAGA KERJA
1. Pekerja Hari/Orang 6.000 50,000.00 300,000.00
2. Tukang Kayu Hari/Orang 18.000 75,000.00 1,350,000.00
3. Kepala Tukang Hari/Orang 2.000 -
4. Mandor Hari/Orang 0.300 -
JUMLAH 1,650,000.00

B. BAHAN
1. Kayu balok kelas II M3 1.200 4,500,000.00 5,400,000.00
JUMLAH 5,400,000.00
JUMLAH A + B 7,050,000.00
30. 1 m2 Pasang Pintu Panel kelas II
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 1.000 50,000.00 50,000.00
2. Tukang Kayu Hari/Orang 2.500 75,000.00 187,500.00
3. Kepala Tukang Hari/Orang 0.250 -
4. Mandor Hari/Orang 0.050 -
JUMLAH 237,500.00

B. BAHAN
1. Kayu papan kelas II M3 0.040 4,500,000.00 180,000.00
JUMLAH 180,000.00
JUMLAH A + B 417,500.00

31. 1 m2 pasang pintu fiber


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Tukang Hari/Orang 1.050 50,000.00 52,500.00
2. Pekerja Hari/Orang 1.050 75,000.00 78,750.00
3. Kepala Tukang Hari/Orang 0.105 -
4. Mandor Hari/Orang 0.0052 -
JUMLAH 131,250.00

B. BAHAN
1. Pintu Fiber M2 1.000 220,000.00 220,000.00
JUMLAH 220,000.00
JUMLAH A + B 351,250.00

32. 1 m3 Pasang konstruksi kuda-kuda kayu kelas II


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 4.000 50,000.00 200,000.00
2. Tukang Kayu Hari/Orang 12.000 75,000.00 900,000.00
3. Kepala Tukang Hari/Orang 1.200 -
4. Mandor Hari/Orang 0.200 -
JUMLAH 1,100,000.00

B. BAHAN
1. Kayu balok kelas II M3 1.100 4,500,000.00 4,950,000.00
2. Besi strip Kg 15.000 25,000.00 375,000.00
3. Paku biasa 2" - 5" Kg 0.800 15,000.00 12,000.00
JUMLAH 5,337,000.00
JUMLAH A + B 6,437,000.00

33. 1 m³ Pasang Gording Kelas II


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 2.000 50,000.00 100,000.00
2. Tukang Kayu Hari/Orang 6.000 75,000.00 450,000.00
3. Kepala Tukang Hari/Orang 0.600 -
4. Mandor Hari/Orang 0.100 -
JUMLAH 550,000.00

B. BAHAN
1. Kayu balok kelas II M3 1.100 4,500,000.00 4,950,000.00
2. Paku biasa 2" - 5" Kg 1.300 15,000.00 19,500.00
JUMLAH 4,969,500.00
JUMLAH A + B 5,519,500.00
34. 1 m2 Pasang atap seng gelombang
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.120 50,000.00 6,000.00
2. Tukang Kayu Hari/Orang 0.060 75,000.00 4,500.00
3. Kepala Tukang Hari/Orang 0.006 -
4. Mandor Hari/Orang 0.006 -
JUMLAH 10,500.00

B. BAHAN
1. Seng gelombang 3' x 6' bjls 28 Lmbr 0.700 40,600.00 28,420.00
2. Paku biasa /2" - 1"
1
Kg 0.020 15,000.00 300.00
JUMLAH 28,720.00
JUMLAH A + B 39,220.00

35. 1 m2 Pasang rangka langit-langit ( 30 x 30 ) cm, kayu kelas II


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.250 50,000.00 12,500.00
2. Tukang Kayu Hari/Orang 0.350 75,000.00 26,250.00
3. Kepala Tukang Hari/Orang 0.035 -
4. Mandor Hari/Orang 0.0125 -
JUMLAH 38,750.00

B. BAHAN
1. Kayu balok kelas II M3 0.027 4,500,000.00 121,500.00
2. Paku biasa 2" - 5" Kg 0.200 15,000.00 3,000.00
JUMLAH 124,500.00
JUMLAH A + B 163,250.00

36. 1 m2 Langit - langit Teakwood ( 30 x 60 ) cm, tebal 4 mm


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.070 50,000.00 3,500.00
2. Tukang Kayu Hari/Orang 0.100 75,000.00 7,500.00
3. Kepala Tukang Hari/Orang 0.010 -
4. Mandor Hari/Orang 0.0035 -
JUMLAH 11,000.00

B. BAHAN
1. Teakwood 4' x 8' x 4 mm Lmbr 0.360 48,000.00 -
2. Paku Kg 0.030 17,000.00 -
JUMLAH -
JUMLAH A + B 11,000.00

37. 1 m' Pasang lisplank ukuran ( 3 x 20 ) cm, kayu papan kelas II


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.100 50,000.00 5,000.00
2. Tukang Kayu Hari/Orang 0.200 75,000.00 15,000.00
3. Kepala Tukang Hari/Orang 0.025 -
4. Mandor Hari/Orang 0.005 -
JUMLAH 20,000.00

B. BAHAN
1. Kayu papan kelas II M3 0.0072 3,858,000.00 27,777.60
2. Paku biasa 2" - 5" Kg 0.050 17,000.00 850.00
JUMLAH 28,627.60
JUMLAH A + B 48,627.60
38. 1 m2 pengecatan tembok baru ( 1 lapis cat dasar, 2 lapis cat penutup )
NO. HARGA SATUAN BIAYA SATUAN
URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.028 50,000.00 1,400.00
2. Tukang Cat Hari/Orang 0.042 75,000.00 3,150.00
3. Kepala Tukang Hari/Orang 0.0042 -
4. Mandor Hari/Orang 0.0025 -
JUMLAH 4,550.00

B. BAHAN
1. Cat dasar Kg 0.120 85,000.00 10,200.00
2. Cat penutup 2 kali Kg 0.180 85,000.00 15,300.00
JUMLAH 25,500.00
JUMLAH A + B 30,050.00

39. 1 m2 pengecatan tembok baru ( 1 lapis plamur ), 1 lapis cat dasar, 2 lapis cat penutup
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.020 50,000 1,000
2. Tukang Cat Hari/Orang 0.063 75,000 4,725
3. Kepala Tukang Hari/Orang 0.0063 -
4. Mandor Hari/Orang 0.0025 -
JUMLAH 5,725

B. BAHAN
1. Plamur Kg 0.100 60,000 6,000
2. Cat dasar Kg 0.100 85,000 8,500
3. Cat penutup 2 kali Kg 0.260 85,000 22,100
JUMLAH 36,600
JUMLAH A + B 42,325

39. 1 m2 pengecatan bidang kayu baru ( 1 lapis plamur ), 1 lapis cat dasar, 2 lapis cat penutup
NO. HARGA SATUAN BIAYA SATUAN
URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.070 50,000.00 3,500.00
2. Tukang Cat Hari/Orang 0.009 75,000.00 675.00
3. Kepala Tukang Hari/Orang 0.006 - -
4. Mandor Hari/Orang 0.0025 -
JUMLAH 4,175.00

B. BAHAN
1. Cat meni Kg 0.200 65,000.00 13,000.00
2. Plamur Kg 0.150 60,000.00 9,000.00
3. Cat dasar Kg 0.170 45,000.00 7,650.00
4. Cat penutup 2 kali Kg 0.260 45,000.00 11,700.00
JUMLAH 11,700.00
JUMLAH A + B 15,875.00

40. 1 m2 pasang man hole


NO. HARGA SATUAN BIAYA SATUAN
URAIAN SATUAN KUANTITAS
URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 1.200 50,000.00 60,000.00
2. Tukang Las Hari/Orang 1.200 75,000.00 90,000.00
3. Kepala Tukang Hari/Orang 0.012 -
4. Mandor Hari/Orang 0.0006 -
JUMLAH 150,000.00

B. BAHAN
1. Besi plat M² 0.416 700,000.00 291,480.00
2. Besi siku 40.40.4 M' 8.000 54,000.00 432,000.00
JUMLAH 723,480.00
JUMLAH A + B 873,480.00
41. 1 m2 pasang tangga monyet
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Tukang Las Hari/Orang 1.200 50,000.00 60,000.00
2. Pekerja Hari/Orang 1.200 75,000.00 90,000.00
3. Kepala Tukang Hari/Orang 0.012 -
4. Mandor Hari/Orang 0.0006 -
JUMLAH 150,000.00

B. BAHAN
1. Pipa gip 1" M' 4.000 39,167 156,666.67
JUMLAH 156,666.67
JUMLAH A + B 306,666.67

42. 1 bh engsel
NO. HARGA SATUAN BIAYA SATUAN
URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.015 50,000.00 750.00
2. Tukang Kayu Hari/Orang 0.150 75,000.00 11,250.00
3. Kepala Tukang Hari/Orang 0.015 -
4. Mandor Hari/Orang 0.00075 -
JUMLAH 12,000.00

B. BAHAN
1. Engsel pintu Buah 1.000 25,000.00 25,000.00
JUMLAH 25,000.00
JUMLAH A + B 37,000.00

43. 1 buah kunci pintu


NO. HARGA SATUAN BIAYA SATUAN
URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.020 50,000.00 1,000.00
2. Tukang Kayu Hari/Orang 0.200 75,000.00 15,000.00
3. Kepala Tukang Hari/Orang 0.020 -
4. Mandor Hari/Orang 0.00100 -
JUMLAH 16,000.00

B. BAHAN
1. Kunci Pintu Buah 1.000 25,000.00 25,000.00
JUMLAH 25,000.00
JUMLAH A + B 41,000.00

44. Memasang 1 buah kloset jongkok teraso


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 1.000 50,000.00 50,000.00
2. Tukang Batu Hari/Orang 1.500 75,000.00 112,500.00
3. Kepala Tukang Hari/Orang 0.300 -
4. Mandor Hari/Orang 0.110 -
JUMLAH 162,500.00
B. BAHAN
1. Kloset jongkok teraso Buah 1.000 300,000.00 300,000.00
2. Bata merah 5 x 11 x 22 cm Buah 7.000 550.00 3,850.00
3. Sement portland Kg 6.000 1,200.00 7,200.00
4. Pasir pasang M3 0.010 125,000.00 1,250.00
JUMLAH 312,300.00
JUMLAH A + B 474,800.00
45. Memasang 1 m buah bak kontrol pasangan batu batu ukuran ( 30 x 30 ) cm, tinggi 35 cm
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 3.200 50,000.00 160,000.00
2. Tukang Batu Hari/Orang 1.015 75,000.00 76,125.00
3. Kepala Tukang Hari/Orang 0.0015 -
4. Mandor Hari/Orang 0.016 -
JUMLAH 236,125.00

B. BAHAN
1. Batu bata M3 0.145 550.00 79.75
2. Sement portland Kg 44.000 1,200.00 52,800.00
3. Pasir pasang M3 0.070 125,000.00 8,750.00
4. Batu kerikil M3 0.070 325,000.00 22,750.00
5. Besi beton Kg 1.600 9,000.00 14,400.00
6. Pasir beton M3 0.060 125,000.00 7,500.00
JUMLAH 106,279.75
JUMLAH A + B 342,404.75
46. Memasang 1 m buah bak kontrol pasangan batu batu ukuran ( 45 x 45 ) cm, tinggi 50 cm
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 1.42 50,000.00 71,000.00
2. Tukang Batu Hari/Orang 0.473 75,000.00 35,475.00
3. Kepala Tukang Hari/Orang 0.47 -
4. Mandor Hari/Orang 0.071 -
JUMLAH 106,475.00

B. BAHAN
1. Batu bata M3 0.25 550.00 137.50
2. Sement portland Kg 77 1,200.00 92,400.00
3. Pasir pasang M3 0.13 125,000.00 16,250.00
4. Batu kerikil M3 0.02 300,000.00 6,000.00
5. Besi beton Kg 2.6 9,000.00 23,400.00
6. Pasir beton M3 0.09 125,000.00 11,250.00
JUMLAH 149,437.50
JUMLAH A + B 255,912.50

47. Memasang 1 m buah bak kontrol pasangan batu bata ukuran ( 60 x 60 ) cm, tinggi 65 cm
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 2.160 50,000.00 108,000.00
2. Tukang Batu Hari/Orang 0.720 75,000.00 54,000.00
3. Kepala Tukang Hari/Orang 0.072 -
4. Mandor Hari/Orang 0.108 -
5. Tukang Gali Hari/Orang 0.100 -
JUMLAH 162,000.00

B. BAHAN
1. Batu bata M3 0.371 550.00 204.05
2. Sement portland Kg 114.000 1,200.00 136,800.00
3. Pasir pasang M3 0.184 125,000.00 23,000.00
4. Batu koral M3 0.033 300,000.00 9,900.00
5. Besi beton Kg 4.850 9,000.00 43,650.00
6. Pasir beton M3 0.120 125,000.00 15,000.00
JUMLAH 228,554.05
JUMLAH A + B 390,554.05
48. Memasang 1 m' Pipa PVC tipe AW diameter 1/2"
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.036 50,000.00 1,800.00
2. Tukang Batu Hari/Orang 0.060 75,000.00 4,500.00
3. Kepala Tukang Hari/Orang 0.006 -
4. Mandor Hari/Orang 0.0018 -
JUMLAH 6,300.00

B. BAHAN
1. Pipa PVC M' 1.200 1,833.33 2,200.00
2. Perlengkapan 35 % harga pipa Ls 0.35 - -
JUMLAH 2,200.00
JUMLAH A + B 8,500.00

49. Memasang 1 m' Pipa PVC tipe AW diameter 3/4"


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.036 50,000.00 1,800.00
2. Tukang Hari/Orang 0.060 75,000.00 4,500.00
3. Kepala Tukang Hari/Orang 0.006 -
4. Mandor Hari/Orang 0.0018 -
JUMLAH 6,300.00

B. BAHAN
1. Pipa PVC M' 1.200 2,700.00 3,240.00
2. Perlengkapan 35 % harga pipa Ls 0.35 - -
JUMLAH 3,240.00
JUMLAH A + B 9,540.00

50. Memasang 1 m' Pipa PVC tipe AW diameter 1"


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.036 50,000.00 1,800.00
2. Tukang Batu Hari/Orang 0.060 75,000.00 4,500.00
3. Kepala Tukang Hari/Orang 0.006 -
4. Mandor Hari/Orang 0.0018 -
JUMLAH 6,300.00

B. BAHAN
1. Pipa PVC M' 1.200 4,566.67 5,480.00
2. Perlengkapan 35 % harga pipa Ls 0.350 - -
JUMLAH 5,480.00
JUMLAH A + B 11,780.00

51. Memasang 1 m' Pipa PVC tipe AW diameter 1 ¼"


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.036 50,000.00 1,800.00
2. Tukang Batu Hari/Orang 0.060 75,000.00 4,500.00
3. Kepala Tukang Hari/Orang 0.006 -
4. Mandor Hari/Orang 0.0018 -
JUMLAH 6,300.00

B. BAHAN
1. Pipa PVC M' 1.200 6,700.00 8,040.00
2. Perlengkapan 35 % harga pipa Ls 0.350 - -
JUMLAH 8,040.00
JUMLAH A + B 14,340.00
52. Memasang 1 m' Pipa PVC tipe AW diameter 11/2"
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.036 50,000.00 1,800.00
2. Tukang Batu Hari/Orang 0.060 75,000.00 4,500.00
3. Kepala Tukang Hari/Orang 0.006 -
4. Mandor Hari/Orang 0.0018 -
JUMLAH 6,300.00

B. BAHAN
1. Pipa PVC M' 1.200 15,450.00 18,540.00
2. Perlengkapan 35 % harga pipa Ls 0.350 - -
JUMLAH 18,540.00
JUMLAH A + B 24,840.00

53. Memasang 1 m' Pipa PVC tipe AW diameter 2"


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.054 50,000.00 2,700.00
2. Tukang Batu Hari/Orang 0.090 75,000.00 6,750.00
3. Kepala Tukang Hari/Orang 0.009 -
4. Mandor Hari/Orang 0.0027 -
JUMLAH 9,450.00

B. BAHAN
1. Pipa PVC M' 1.200 19,700.00 23,640.00
2. Perlengkapan 35 % harga pipa Ls 0.350 - -
JUMLAH 23,640.00
JUMLAH A + B 33,090.00

54. Memasang 1 m' Pipa PVC tipe AW diameter 3"


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.081 50,000.00 4,050.00
2. Tukang Batu Hari/Orang 0.135 75,000.00 10,125.00
3. Kepala Tukang Hari/Orang 0.0135 -
4. Mandor Hari/Orang 0.0041 -
JUMLAH 14,175.00

B. BAHAN
1. Pipa PVC M' 1.200 41,200.00 49,440.00
2. Perlengkapan 35 % harga pipa Ls 0.350 - -
JUMLAH 49,440.00
JUMLAH A + B 63,615.00

55. Memasang 1 m' Pipa PVC tipe AW diameter 4"


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.081 50,000.00 4,050.00
2. Tukang Batu Hari/Orang 0.135 75,000.00 10,125.00
3. Kepala Tukang Hari/Orang 0.0135 -
4. Mandor Hari/Orang 0.0041 -
JUMLAH 14,175.00

B. BAHAN
1. Pipa PVC M' 1.200 59,916.67 71,900.00
2. Perlengkapan 35 % harga pipa Ls 0.350 -
JUMLAH 71,900.00
JUMLAH A + B 86,075.00
56. Memasang 1 buah kran diameter 3/4" atau 1/2"
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.010 50,000.00 500.00
2. Tukang Batu Hari/Orang 0.100 75,000.00 7,500.00
3. Kepala Tukang Hari/Orang 0.010 -
4. Mandor Hari/Orang 0.005 -
JUMLAH 8,000.00

B. BAHAN
1. Kran air Buah 1.000 30,000.00 30,000.00
2. Seal tape Buah 0.025 5,500.00 137.50
JUMLAH 30,137.50
JUMLAH A + B 38,137.50

57. Memasang 1 m' Pipa galvanis diameter 1/2"


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.054 50,000.00 2,700.00
2. Tukang Batu Hari/Orang 0.090 75,000.00 6,750.00
3. Kepala Tukang Hari/Orang 0.009 -
4. Mandor Hari/Orang 0.027 -
JUMLAH 9,450.00

B. BAHAN
1. Pipa galvanis M' 1.200 20,000 24,000.00
2. Perlengkapan 35 % harga pipa - - -
JUMLAH 24,000.00
JUMLAH A + B 33,450.00

58. Memasang 1 m' Pipa galvanis diameter 3/4"


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.054 50,000.00 2,700.00
2. Tukang Batu Hari/Orang 0.090 75,000.00 6,750.00
3. Kepala Tukang Hari/Orang 0.009 -
4. Mandor Hari/Orang 0.027 -
JUMLAH 9,450.00

B. BAHAN
1. Pipa galvanis M' 1.200 27,917 33,500.00
2. Perlengkapan 35 % harga pipa - - -
JUMLAH 33,500.00
JUMLAH A + B 42,950.00

59. Memasang 1 m' Pipa galvanis diameter 1"


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.054 50,000.00 2,700.00
2. Tukang Batu Hari/Orang 0.090 75,000.00 6,750.00
3. Kepala Tukang Hari/Orang 0.009 -
4. Mandor Hari/Orang 0.027 -
JUMLAH 9,450.00

B. BAHAN
1. Pipa galvanis M' 1.200 39,167 47,000.00
2. Perlengkapan 35 % harga pipa - - -
JUMLAH 47,000.00
JUMLAH A + B 56,450.00

60. Memasang 1 m' Pipa galvanis diameter 11/2"


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.108 50,000.00 5,400.00
2. Tukang Batu Hari/Orang 0.180 75,000.00 13,500.00
3. Kepala Tukang Hari/Orang 0.018 -
4. Mandor Hari/Orang 0.0054 -
JUMLAH 18,900.00

B. BAHAN
1. Pipa galvanis M' 1.200 59,167 71,000.00
2. Perlengkapan 35 % harga pipa - - -
JUMLAH 71,000.00
JUMLAH A + B 89,900.00

61. Memasang 1 m' Pipa galvanis diameter 2"


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.108 50,000.00 5,400.00
2. Tukang Batu Hari/Orang 0.180 75,000.00 13,500.00
3. Kepala Tukang Hari/Orang 0.018 -
4. Mandor Hari/Orang 0.0054 -
JUMLAH 18,900.00

B. BAHAN
1. Pipa galvanis M' 1.200 74,166.67 89,000.00
2. Perlengkapan 35 % harga pipa Ls - - 31,150.00
JUMLAH 120,150.00
JUMLAH A + B 139,050.00

62. Memasang 1 m' Pipa galvanis diameter 3"


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.108 50,000.00 5,400.00
2. Tukang Batu Hari/Orang 0.180 75,000.00 13,500.00
3. Kepala Tukang Hari/Orang 0.018 -
4. Mandor Hari/Orang 0.0054 -
JUMLAH 18,900.00

B. BAHAN
1. Pipa galvanis M' 1.200 129,167 155,000.00
2. Perlengkapan 35 % harga pipa - - -
JUMLAH 155,000.00
JUMLAH A + B 173,900.00

63. Memasang 1 buah floor drain


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.010 50,000.00 500.00
2. Tukang Batu Hari/Orang 0.100 75,000.00 7,500.00
3. Kepala Tukang Hari/Orang 0.010 -
4. Mandor Hari/Orang 0.005 -
JUMLAH 8,000.00

B. BAHAN
1. Floor drain Buah 1.000 35,000.00 35,000.00
JUMLAH 35,000.00
JUMLAH A + B 43,000.00
6.2 1 buah pasang kunci tanam biasa
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.010 50,000.00 500.00
2. Tukang Kayu Hari/Orang 0.500 75,000.00 37,500.00
3. Kepala Tukang Hari/Orang 0.010 -
4. Mandor Hari/Orang 0.005 -
JUMLAH 38,000.00

B. BAHAN
1. Kunci tanam biasa Buah 1.000 150,000.00 150,000.00
JUMLAH 150,000.00
JUMLAH A + B 188,000.00

6.5 1 buah pasang engsel pintu


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.015 50,000.00 750.00
2. Tukang Kayu Hari/Orang 0.150 75,000.00 11,250.00
3. Kepala Tukang Hari/Orang 0.015 -
4. Mandor Hari/Orang 0.00075 -
JUMLAH 12,000.00

B. BAHAN
1. Engsel pintu Buah 1.000 25,000.00 25,000.00
JUMLAH 25,000.00
JUMLAH A + B 37,000.00

6.6 1 buah pasang engsel jendela kupu-kupu


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.010 50,000.00 500.00
2. Tukang Kayu Hari/Orang 0.100 75,000.00 7,500.00
3. Kepala Tukang Hari/Orang 0.010 -
4. Mandor Hari/Orang 0.0005 -
JUMLAH 8,000.00

B. BAHAN
1. Engsel jendela Buah 1.000 25,000.00 25,000.00
JUMLAH 25,000.00
JUMLAH A + B 33,000.00

63. Memasang 1 buah Beronjong (2 x 1 x 0,5) = 1 m³


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 3.000 50,000.00 150,000.00
2. Tukang Hari/Orang 0.050 75,000.00 3,750.00
JUMLAH 153,750.00

B. BAHAN
1. Kawat Beronjong Buah 1.000 250,000.00 250,000.00
1. Batu Kali 10/20 cm m³ 1.200 137,500.00 165,000.00
JUMLAH 415,000.00
JUMLAH A + B 568,750.00
DAFTAR ANALISA
PROGRAM : PAMSIMAS
PEKERJAAN : SARANA AIR MINUM DAN SANITASI
LOKASI : Desa Mattirowalie Kabupaten Wajo
TAHUN ANGGARAN : 2011

6.8 1 m2 Membersihkan lapangan dan peralatan


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.100 40,000.00 4,000.00
4. Mandor Hari/Orang 0.050 - -
JUMLAH 4,000.00
JUMLAH 4,000.00
6.4 1 m' Pengukuran dan pemasangan bouwplank
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.100 40,000.00 4,000.00
4. Tukang Kayu Hari/Orang 0.005 50,000.00 250.00
JUMLAH 4,250.00
B. BAHAN
1. Kayu Klas IV uk. 5/7 M3 0.012 750,000.00 9,000.00
2. Paku biasa 2" - 5" Kg 0.020 20,000.00 400.00
3. Kayu papan 3/20 M3 0.007 1,600,000.00 11,200.00
JUMLAH 20,600.00
JUMLAH A + B 24,850.00
6.1 1 m3 Galian tanah biasa sedalam 1 meter
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.400 40,000.00 16,000.00
4. Tukang Gali Hari/Orang 0.040 50,000.00 2,000.00
JUMLAH A 18,000.00
6.4 1 m3 Galian tanah keras sedalam 1 meter
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.625 40,000.00 25,000.00
4. Tukang Gali Hari/Orang 0.062 50,000.00 3,100.00
JUMLAH A 28,100.00
6.9 1 m3 Urugan kembali
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.192 40,000.00 7,680.00
4. Mandor Hari/Orang 0.019 - -
JUMLAH A 7,680.00
6.10 1 m3 Pemadatan tanah
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.500 40,000.00 20,000.00
4. Tukang Gali Hari/Orang 0.050 50,000.00 2,500.00
JUMLAH A 22,500.00
6.11 1 m3 Urugan pasir
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.300 40,000.00 12,000.00
4. Tukang Gali Hari/Orang 0.010 - -
JUMLAH A 12,000.00
B. BAHAN
1. Pasir urug M3 1.200 80,000.00 96,000.00
JUMLAH 96,000.00
JUMLAH A + B 108,000.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 1.500 40,000.00 60,000.00
2. Tukang Batu Hari/Orang 0.600 50,000.00 30,000.00
JUMLAH 90,000.00
B. BAHAN
1. Batu belah 10/15 cm M3 1.100 120,000.00 132,000.00
2. Semen Portland Kg 163.000 1,040.00 169,520.00
3. Pasir pasang M3 0.520 100,000.00 52,000.00
JUMLAH 353,520.00
JUMLAH A + B 443,520.00

PAMSIMAS 2011 RKM HID Desa Mattirowalie


6.14 1 m3 Pasang pondasi batu kosong / anstamping
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.780 40,000.00 31,200.00
2. Tukang Batu Hari/Orang 0.390 50,000.00 19,500.00
JUMLAH 50,700.00
B. BAHAN
1. Batu belah 10/15 cm M3 1.200 120,000.00 144,000.00
2. Pasir urug M3 0.300 80,000.00 24,000.00
JUMLAH 168,000.00
JUMLAH A + B 218,700.00
6.1 1 m3 Membuat beton tumbuk, 1 Pc : 3 Ps : 5 Kr
A. TENAGA KERJA
1. Pekerja Hari/Orang 1.650 40,000.00 66,000.00
2. Tukang Batu Hari/Orang 0.250 50,000.00 12,500.00
JUMLAH 78,500.00
B. BAHAN
1. Semen Portland Kg 218.000 1,040.00 226,720.00
2. Pasir beton M3 0.520 100,000.00 52,000.00
3. Koral beton M3 0.870 250,000.00 217,500.00
JUMLAH 496,220.00
JUMLAH A + B 574,720.00
6.5 1 m3 Membuat beton bertulang, 1 Pc : 2 Ps : 3 Kr
A. TENAGA KERJA
1. Pekerja Hari/Orang 1.650 40,000.00 66,000.00
2. Tukang Batu Hari/Orang 0.250 50,000.00 12,500.00
JUMLAH 78,500.00
B. BAHAN
1. Semen Portland Kg 232.000 1,040.00 241,280.00
2. Pasir beton M 3
0.520 100,000.00 52,000.00
3. Koral beton M3 0.780 250,000.00 195,000.00
JUMLAH 488,280.00
JUMLAH A + B 566,780.00
6.25 1 Kg Pembesian dengan besi polos atau besi ulir
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.007 40,000.00 280.00
2. Tukang Besi Hari/Orang 0.007 50,000.00 350.00
JUMLAH 630.00
B. BAHAN
1. Besi beton ( polos/ulir ) Kg 1.050 9,000.00 9,450.00
2. Kawat beton Kg 0.015 18,000.00 270.00
JUMLAH 9,720.00
JUMLAH A + B 10,350.00
6.28 1 m2 Pasang bekisting untuk pondasi
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.300 40,000.00 12,000.00
2. Tukang Kayu Hari/Orang 0.260 50,000.00 13,000.00
JUMLAH 25,000.00
B. BAHAN
1. Kayu terentang M3 0.040 750,000.00 30,000.00
2. Paku biasa 2" - 5' Kg 0.300 20,000.00 6,000.00
3. Minyak bekisting Ltr 0.100 4,000.00 400.00
JUMLAH 36,400.00
JUMLAH A + B 61,400.00
6.29 1 m2 Pasang bekisting untuk sloof
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.300 40,000.00 12,000.00
2. Tukang Kayu Hari/Orang 0.260 50,000.00 13,000.00
JUMLAH 25,000.00
B. BAHAN
1. Kayu terentang M3 0.045 750,000.00 33,750.00
2. Paku biasa 2" - 5' Kg 0.300 20,000.00 6,000.00
3. Minyak bekisting Ltr 0.100 4,000.00 400.00
JUMLAH 40,150.00
JUMLAH A + B 65,150.00

PAMSIMAS 2011 RKM HID Desa Mattirowalie


6.30 1 m2 Pasang bekisting untuk kolom
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.300 40,000.00 12,000.00
2. Tukang Kayu Hari/Orang 0.330 50,000.00 16,500.00
JUMLAH 28,500.00
B. BAHAN
1. Kayu terentang M3 0.040 750,000.00 30,000.00
2. Paku biasa 2" - 5' Kg 0.400 20,000.00 8,000.00
3. Minyak bekisting Ltr 0.200 4,000.00 800.00
4. Balok kayu borneo M3 0.015 1,500,000.00 22,500.00
5. Plywood tebal 9 mm Lmbr 0.350 120,000.00 42,000.00
JUMLAH 103,300.00
JUMLAH A + B 131,800.00
6.31 1 m2 Pasang bekisting untuk balok
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.320 40,000.00 12,800.00
2. Tukang Kayu Hari/Orang 0.330 50,000.00 16,500.00
JUMLAH 29,300.00

B. BAHAN
1. Kayu terentang M3 0.040 750,000.00 30,000.00
2. Paku biasa 2" - 5' Kg 0.400 20,000.00 8,000.00
3. Minyak bekisting Ltr 0.200 4,000.00 800.00
4. Balok kayu borneo M3 0.018 1,500,000.00 27,000.00
5. Plywood tebal 9 mm Lmbr 0.350 120,000.00 42,000.00
JUMLAH 107,800.00
JUMLAH A + B 137,100.00
6.32 1 m2 Pasang bekisting untuk lantai
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.320 40,000.00 12,800.00
2. Tukang Batu Hari/Orang 0.330 50,000.00 16,500.00
3. Kepala Tukang Hari/Orang 0.033 -
4. Mandor Hari/Orang 0.006 -
JUMLAH 29,300.00
B. BAHAN
1. Kayu terentang M3 0.040 750,000.00 30,000.00
2. Paku biasa 2" - 5' Kg 0.400 20,000.00 8,000.00
3. Minyak bekisting Ltr 0.200 -
4. Balok kayu borneo M3 0.015 1,500,000.00 22,500.00
5. Plywood tebal 9 mm Lmbr 0.350 120,000.00 42,000.00
JUMLAH 102,500.00
JUMLAH A + B 131,800.00
6.33 1 m2 Pasang bekisting untuk dinding
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.320 40,000.00 12,800.00
2. Tukang Kayu Hari/Orang 0.330 50,000.00 16,500.00
JUMLAH 29,300.00
B. BAHAN
1. Kayu terentang M3 0.030 750,000.00 22,500.00
2. Paku biasa 2" - 5' Kg 0.400 20,000.00 8,000.00
3. Minyak bekisting Ltr 0.200 - -
4. Balok kayu borneo M3 0.020 1,500,000.00 30,000.00
5. Plywood tebal 9 mm Lmbr 0.350 120,000.00 42,000.00
JUMLAH 102,500.00
JUMLAH A + B 131,800.00
6.36 1 m3 Membuat beton dengan mutu K 275
A. TENAGA KERJA
1. Pekerja Hari/Orang 6.000 40,000.00 240,000.00
2. Tukang Batu Hari/Orang 1.000 50,000.00 50,000.00
JUMLAH 290,000.00
B. BAHAN
1. Semen Portland Kg 400.000 1,040.00 416,000.00
2. Pasir beton M3 0.400 100,000.00 40,000.00
3. Koral beton M3 0.820 250,000.00 205,000.00

PAMSIMAS 2011 RKM HID Desa Mattirowalie


JUMLAH 661,000.00
JUMLAH A + B 951,000.00

PAMSIMAS 2011 RKM HID Desa Mattirowalie


6.45 1 m' Membuat Kolom penguat beton bertulang ( 11 x 11 ) cm
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.060 40,000.00 2,400.00
2. Tukang Batu Hari/Orang 0.020 50,000.00 1,000.00
3. Tukang Kayu Hari/Orang 0.020 50,000.00 1,000.00
4. Tukang Besi Hari/Orang 0.020 50,000.00 1,000.00
JUMLAH 5,400.00
B. BAHAN
1. Kayu terentang M3 0.002 750,000.00 1,500.00
2. Paku biasa 2" - 5' Kg 0.010 20,000.00 200.00
3. Besi beton polos Kg 3.000 9,000.00 27,000.00
4. Kawat beton Kg 0.450 18,000.00 8,100.00
5. Semen portland Kg 4.000 1,040.00 4,160.00
6. Pasir beton M3 0.006 100,000.00 600.00
7. Koral beton M3
0.009 250,000.00 2,250.00
JUMLAH 43,810.00
JUMLAH A + B 49,210.00
6.46 1 m' Membuat ring balok beton bertulang ( 10 x 15 ) cm
1. Pekerja Hari/Orang 0.100 40,000.00 4,000.00
2. Tukang Batu Hari/Orang 0.033 50,000.00 1,650.00
3. Tukang Kayu Hari/Orang 0.033 50,000.00 1,650.00
4. Tukang Besi Hari/Orang 0.033 50,000.00 1,650.00
JUMLAH 8,950.00
B. BAHAN
1. Kayu albasiah M3 0.003 750,000.00 2,250.00
2. Paku biasa 2" - 5' Kg 0.020 20,000.00 400.00
3. Besi beton polos Kg 3.600 9,000.00 32,400.00
4. Kawat beton Kg 0.050 18,000.00 900.00
5. Semen portland Kg 5.500 1,040.00 5,720.00
6. Pasir beton M3 0.009 100,000.00 900.00
7. Koral beton M3 0.015 250,000.00 3,750.00
JUMLAH 46,320.00
JUMLAH A + B 55,270.00
6.9 1 m2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 2 Ps
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.320 40,000.00 12,800.00
2. Tukang Batu Hari/Orang 0.100 50,000.00 5,000.00
JUMLAH 17,800.00
B. BAHAN
1. Bata merah 5 x 11 x 22 cm Bh 70.000 700.00 49,000.00
2. Semen Portland Kg 18.950 1,040.00 19,708.00
3. Pasir pasang M3 0.038 100,000.00 3,800.00
JUMLAH 72,508.00
JUMLAH A + B 90,308.00
6.11 1 m Pasangan bata merah tebal /2 bata, 1 Pc : 4 Ps
2 1

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.320 40,000.00 12,800.00
2. Tukang Batu Hari/Orang 0.100 50,000.00 5,000.00
JUMLAH 17,800.00
B. BAHAN
1. Bata merah 5 x 11 x 22 cm Bh 70.000 700.00 49,000.00
2. Semen Portland Kg 11.500 1,040.00 11,960.00
3. Pasir pasang M3 0.043 100,000.00 4,300.00
JUMLAH 65,260.00
JUMLAH A + B 83,060.00
6.3 1 m2 Plesteran 1 Pc : 3 Ps, tebal 15 mm
1. Pekerja Hari/Orang 0.200 40,000.00 8,000.00
2. Tukang Batu Hari/Orang 0.150 50,000.00 7,500.00
JUMLAH 15,500.00
B. BAHAN
1. Semen Portland Kg 6.480 1,040.00 6,739.20
2. Pasir pasang M3
0.019 100,000.00 1,900.00
JUMLAH 8,639.20
JUMLAH A + B 24,139.20

PAMSIMAS 2011 RKM HID Desa Mattirowalie


6.5 1 m2 Plesteran 1 Pc : 4 Ps, tebal 15 mm
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.200 40,000.00 8,000.00
Tukang Batu Hari/Orang 0.150 50,000.00 7,500.00
JUMLAH 15,500.00
B. BAHAN
1. Semen Portland Kg 5.200 1,040.00 5,408.00
2. Pasir pasang M 3
0.020 100,000.00 2,000.00
7,408.00
JUMLAH A + B 22,908.00
6.13 1 m2 Plesteran 1 Pc : 2 Ps, tebal 20 mm
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.250 40,000.00 10,000.00
2. Tukang Batu Hari/Orang 0.200 50,000.00 10,000.00
JUMLAH 20,000.00
B. BAHAN
1. Semen Portland Kg 14.280 1,040.00 14,851.20
2. Pasir pasang M3 0.023 100,000.00 2,300.00
JUMLAH 17,151.20
JUMLAH A + B 37,151.20
6.15 1 m2 Plesteran 1 Pc : 4 Ps, tebal 20 mm
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.250 40,000.00 10,000.00
2. Tukang Batu Hari/Orang 0.200 50,000.00 10,000.00
JUMLAH 20,000.00
B. BAHAN
1. Semen Portland Kg 8.680 1,040.00 9,027.20
2. Pasir pasang M3 0.028 100,000.00 2,800.00
JUMLAH 11,827.20
JUMLAH A + B 31,827.20
1 m2 Acian Dinding
A. TENAGA KERJA
Pekerja Hari/Orang 0.085 40,000.00 3,400.00
Tukang Batu Hari/Orang 0.05 50,000.00 2,500.00
JUMLAH 5,900.00
B. BAHAN
Semen Portland Kg 5.927 1,040.00 6,164.08
JUMLAH 6,164.08
JUMLAH A + B 12,064.08
6.15 1 m2 pengecatan tembok baru ( 1 lapis cat dasar, 2 lapis cat penutup )
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.028 40,000.00 1,120.00
2. Tukang Cat Hari/Orang 0.042 50,000.00 2,100.00
JUMLAH 3,220.00
B. BAHAN
1. Cat dasar Kg 0.120 18,000.00 2,160.00
2. Cat penutup 2 kali Kg 0.180 18,000.00 3,240.00
JUMLAH 5,400.00
JUMLAH A + B 8,620.00
6.8 1 m2 pengecatan bidang kayu baru ( 1 lapis plamur ), 1 lapis cat dasar, 2 lapis cat penutup
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.070 40,000.00 2,800.00
2. Tukang Cat Hari/Orang 0.009 50,000.00 450.00
JUMLAH 3,250.00
B. BAHAN
1. Cat meni Kg 0.200 9,000.00 1,800.00
2. Plamur Kg 0.150 7,800.00 1,170.00
3. Cat dasar Kg 0.170 38,000.00 6,460.00
4. Cat penutup 2 kali Kg 0.260 38,000.00 9,880.00
JUMLAH 9,880.00
JUMLAH A + B 13,130.00

PAMSIMAS 2011 RKM HID Desa Mattirowalie


6.12 1 m2 pasang man hole
A. TENAGA KERJA
1. Pekerja Hari/Orang 1.200 40,000.00 48,000.00
2. Tukang Las Hari/Orang 1.200 50,000.00 60,000.00
JUMLAH 108,000.00
B. BAHAN
1. Besi plat M² 0.416 450,000.00 187,380.00
2. Besi siku 40.40.4 M' 8.000 59,000.00 472,000.00
JUMLAH 659,380.00
JUMLAH A + B 767,380.00
6.12 1 m2 pasang tangga monyet
A. TENAGA KERJA
1. Tukang Las Hari/Orang 1.200 50,000.00 60,000.00
2. Pekerja Hari/Orang 1.200 40,000.00 48,000.00
JUMLAH 108,000.00
B. BAHAN
1. Pipa gip 1" M' 4.000 110,000.00 440,000.00
JUMLAH 440,000.00
JUMLAH A + B 548,000.00
6.19 Memasang 1 m' Pipa galvanis diameter /2"
1

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.054 40,000.00 2,160.00
2. Tukang Batu Hari/Orang 0.090 - -
JUMLAH 2,160.00
B. BAHAN
1. Pipa galvanis M' 1.000 - -
2. Perlengkapan 35 % harga pipa Ls 1.000 - -
JUMLAH -
JUMLAH A + B 2,160.00
6.20 Memasang 1 m' Pipa galvanis diameter /4"
3

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.054 40,000.00 2,160.00
2. Tukang Batu Hari/Orang 0.090 - -
JUMLAH 2,160.00
B. BAHAN
1. Pipa galvanis M' 1.000 - -
2. Perlengkapan 35 % harga pipa Ls 1.000 - -
JUMLAH -
JUMLAH A + B 2,160.00
6.23 Memasang 1 m' Pipa galvanis diameter 2"
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.108 40,000.00 4,320.00
2. Tukang Batu Hari/Orang 0.180 - -
JUMLAH 4,320.00
B. BAHAN
1. Pipa galvanis M' 1.000 - -
2. Perlengkapan 35 % harga pipa Ls 1.000 - -
JUMLAH -
JUMLAH A + B 4,320.00
6.24 Memasang 1 m' Pipa galvanis diameter 2 1/2"
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.108 40,000.00 4,320.00
2. Tukang Batu Hari/Orang 0.180 - -
JUMLAH 4,320.00
B. BAHAN
1. Pipa galvanis M' 1.000 - -
2. Perlengkapan 35 % harga pipa Ls 1.000 - -
JUMLAH -

PAMSIMAS 2011 RKM HID Desa Mattirowalie


JUMLAH A + B 4,320.00

PAMSIMAS 2011 RKM HID Desa Mattirowalie


6.25 Memasang 1 m' Pipa PVC tipe SNI diameter /2"
1

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.036 40,000.00 1,440.00
2. Tukang Batu Hari/Orang 0.060 - -
JUMLAH 1,440.00
B. BAHAN
1. Pipa PVC M' 1.000 - -
2. Perlengkapan 35 % harga pipa Ls 1.000 - -
JUMLAH -
JUMLAH A + B 1,440.00
6.26 Memasang 1 m' Pipa PVC tipe SNI diameter /4"
3

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.036 40,000.00 1,440.00
2. Tukang Batu Hari/Orang 0.060 - -
JUMLAH 1,440.00
B. BAHAN
1. Pipa PVC M' 1.000 - -
2. Perlengkapan 35 % harga pipa Ls 1.000 - -
JUMLAH -
JUMLAH A + B 1,440.00
6.27 Memasang 1 m' Pipa PVC tipe SNI diameter 1"
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.036 40,000.00 1,440.00
2. Tukang Batu Hari/Orang 0.060 - -
JUMLAH 1,440.00
B. BAHAN
1. Pipa PVC M' 1.000 - -
2. Perlengkapan 35 % harga pipa Ls 1.000 - -
JUMLAH -
JUMLAH A + B 1,440.00
6.28 Memasang 1 m' Pipa PVC tipe SNI diameter 1 /2"
1

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.050 40,000.00 2,000.00
2. Tukang Batu Hari/Orang 0.060 - -
JUMLAH 2,000.00
B. BAHAN
1. Pipa PVC M' 1.000 - -
2. Perlengkapan 35 % harga pipa Ls 1.000 - -
JUMLAH -
JUMLAH A + B 2,000.00
6.29 Memasang 1 m' Pipa PVC tipe SNI diameter 2"
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.054 40,000.00 2,160.00
2. Tukang Batu Hari/Orang 0.090 - -
JUMLAH 2,160.00
B. BAHAN
1. Pipa PVC M' 1.000 - -
2. Perlengkapan 35 % harga pipa Ls 1.000 - -
JUMLAH -
JUMLAH A + B 2,160.00

PAMSIMAS 2011 RKM HID Desa Mattirowalie


6.31 Memasang 1 m' Pipa PVC tipe SNI diameter 3"
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.081 40,000.00 3,240.00
2. Tukang Batu Hari/Orang 0.135 - -
JUMLAH 3,240.00
B. BAHAN
1. Pipa PVC M' 1.200 - -
JUMLAH -
JUMLAH A + B 3,240.00
6.35 Memasang 1 buah kran diameter /4" atau /2"
3 1

1. Pekerja Hari/Orang 0.010 40,000.00 400.00


2. Tukang Batu Hari/Orang 0.100 - -
JUMLAH 400.00
B. BAHAN
1. Kran air Buah 1.000 - -
2. Seal tape Buah 0.025 3,000.00 75.00
JUMLAH 75.00
JUMLAH A + B 475.00
6.8 1 m2 Pasang pintu panel kayu kamper
A. TENAGA KERJA
1. Pekerja Hari/Orang 1.000 40,000 40,000.00
2. Tukang Kayu Hari/Orang 2.500 50,000 125,000.00
3. Kepala Tukang Hari/Orang 0.250 -
4. Mandor Hari/Orang 0.050 -
JUMLAH 165,000.00
B. BAHAN
1. Kayu kamper, papan M3 0.040 1600000 64,000.00
JUMLAH 64,000.00
JUMLAH A + B 229,000.00
6.28 1 m3 Pasang konstruksi kuda-kuda kayu kamper
A. TENAGA KERJA
1. Pekerja Hari/Orang 4.000 40,000 160,000.00
2. Tukang Kayu Hari/Orang 12.000 50,000 600,000.00
3. Kepala Tukang Hari/Orang 1.200 -
4. Mandor Hari/Orang 0.200 -
JUMLAH 760,000.00
B. BAHAN
1. Kayu kamper, balok M3 1.100 1500000 1,650,000.00
2. Besi strip Kg 15.000 -
3. Paku biasa 2" - 5" Kg 0.800 20000 16,000.00
JUMLAH 1,666,000.00
JUMLAH A + B 2,426,000.00
6.2 1 m3 Pasang kusen pintu dan jendela kayu kamper
A. TENAGA KERJA
1. Pekerja Hari/Orang 6.000 40,000 240,000.00
2. Tukang Kayu Hari/Orang 18.000 50,000 900,000.00
3. Kepala Tukang Hari/Orang 2.000 -
4. Mandor Hari/Orang 0.300 -
JUMLAH 1,140,000.00
B. BAHAN
1. Kayu kamper, balok M3 1.200 1500000 1,800,000.00
JUMLAH 1,800,000.00
JUMLAH A + B 2,940,000.00

PAMSIMAS 2011 RKM HID Desa Mattirowalie


6.38 1 m2 Pasang atap seng gelombang
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.120 40,000 4,800.00
2. Tukang Kayu Hari/Orang 0.060 50,000 3,000.00
3. Kepala Tukang Hari/Orang 0.006 -
4. Mandor Hari/Orang 0.006 -
JUMLAH 7,800.00
B. BAHAN
1. Seng gelombang 3' x 6' bjls 28 Lmbr 0.700 39000 27,300.00
2. Paku biasa /2" - 1"
1
Kg 0.020 18000 360.00
JUMLAH 27,660.00
JUMLAH A + B 35,460.00

PAMSIMAS 2011 RKM HID Desa Mattirowalie


RENCANA ANGGARAN BIAYA
Provinsi/Kabupaten-Kota/Kecamatan/Desa : Sulawesi Selatan/Wajo/Pitumpanua/Alelebbae
Nomor RAB : 05 Sub pekerjaan/Kegiatan : RUMAH PANEL
Pekerjaan Kegiatan : Sarana Air Minum Ukuran/Dimensi : 1,5 x 2 m

Volume Harga Biaya (Rp)


URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5 3 4 5 7 8 9=2x8 10=3x8 11=4x8 12=5x8
1 BAHAN
A. PEKERJAAN PENDAHULUAN
1.1 Pek. Pemasangan Bowplank 4.00
- Balok Kayu klas III uk. 5/7 0.048 0.048 - m³ 2,800,000 134,400 - 134,400 -
- Paku biasa 2" - 5" 0.080 0.080 - Kg 22,000 1,760 - 1,760 -
- Papan Kayu Kls.III 3/20 0.028 0.028 - m³ 45,000 1,260 - 1,260 -
B. PEKERJAAN TANAH
2.1 Pek. Urugan Pasir dibawah Pondasi 0.228
- Pasir urug 0.273 0.273 - m³ 242,000 66,066 - 66,066 -
2.2 Pek. Urugan Pasir dibawah Lantai 0.204
- Pasir urug 0.245 0.245 - m³ 242,000 59,242 - 59,242 -
C. PEKERJAAN PONDASI BATU GUNUNG
3.1 Pas. Batu Kosong (anstamping) 0.910
- Batu belah 15/20 cm 1.092 - 1.092 m³ 395,000 431,340 - - 431,340
- Pasir urug 0.393 - 0.393 m³ 242,000 95,135 - - 95,135
3.2 Pas. Pondasi Batu Belah (1 : 3) 1.225
- Batu belah 10/15 cm 1.470 - 1.470 M³ 395,000 580,650 - - 580,650
- Semen Portland 247.212 - 247.212 Kg 1,340 331,264 - - 331,264
- Pasir pasang 0.594 - 0.594 M³ 242,000 143,778 - - 143,778
D. PEKERJAAN BETON
4.1 Pek. Lantai Kerja t. 5 cm
* Beton 0.102
- Semen portland 23.460 23.460 Kg 1,340 31,436 - - 31,436
- Pasir Beton 0.065 0.065 m³ 306,000 19,909 - - 19,909
- Batu pecah 2/3/4 cm 0.078 0.078 m³ 591,000 45,859 - - 45,859
4.2 Pek. Kolom 15 x 15
* Beton 0.270
- Semen portland 88.020 88.020 Kg 1,340 117,947 - - 117,947
- Pasir Beton 0.147 0.147 m³ 306,000 44,851 - - 44,851
- Batu pecah 2/3 cm 0.206 0.206 m³ 591,000 121,628 - 121,628
* Pembesian 19.728
- Besi beton Polos Ø 10 16.054 16.054 Kg 15,802 253,684 - - 253,684
- Besi beton Polos Ø 6 4.661 4.661 Kg 18,561 86,506 - - 86,506
- Kawat beton 0.296 0.296 Kg 23,000 6,806 - - 6,806
* Bekisting 1.800
- Paku biasa 2" - 5' 0.720 0.720 Kg 22,000 15,840 - - 15,840
- Balok Kayu klas III uk. 5/7 0.027 0.027 m³ 2,800,000 75,600 - - 75,600
- Tripleks 9 mm 0.630 0.630 Lbr 110,000 69,300 - - 69,300
- Bambu 3.600 3.600 - Btg 31,000 111,600 - 111,600 -
4.3 Pek. Sloef 15 x 15
* Beton 0.315
- Semen portland 102.690 102.690 Kg 1,340 137,605 - - 137,605
- Pasir Beton 0.171 0.171 m³ 306,000 52,326 - - 52,326
- Batu pecah 2/3 cm 0.240 0.240 m³ 591,000 141,899 - - 141,899
* Pembesian 22.687
- Besi beton Polos Ø 10 18.384 18.384 Kg 15,802 290,509 - - 290,509
- Besi beton Polos Ø 6 5.438 5.438 Kg 18,561 100,924 - - 100,924
- Kawat beton 0.340 0.340 Kg 23,000 7,827 - - 7,827
* Bekisting 1.050
- Paku biasa 2" - 5' 0.420 0.420 Kg 22,000 9,240 - - 9,240
- Balok Kayu klas III uk. 5/7 0.016 0.016 m³ 2,800,000 44,100 - - 44,100
- Tripleks 9 mm 0.368 0.368 Lbr 110,000 40,425 - - 40,425
- Bambu 2.100 2.100 - Btg 31,000 65,100 - 65,100 -
4.4 Pek. Plat Atap t. 12 cm
* Beton 1.037
- Semen portland 338.055 338.055 Kg 1,340 452,994 - - 452,994
- Pasir Beton 0.563 0.563 m³ 306,000 172,257 - - 172,257
- Batu pecah 2/3 cm 0.790 0.790 m³ 591,000 467,132 - - 467,132
* Pembesian 39.324
- Besi beton Polos Ø 10 41.291 41.291 Kg 15,802 652,487 - - 652,487
- Kawat beton 0.590 0.590 Kg 23,000 13,567 - - 13,567
* Bekisting 2.850
- Papan Kayu Kls.III 3/20 0.114 0.114 m³ 2,800,000 319,155 - - 319,155
- Paku biasa 2" - 5' 1.140 1.140 Kg 22,000 25,076 - - 25,076
- Balok Kayu klas III uk. 5/7 0.043 0.043 m³ 2,800,000 119,683 - - 119,683
- Bambu 5.699 5.699 - Btg 31,000 176,675 - 176,675 -
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5 3 4 5 7 8 9=2x8 10=3x8 11=4x8 12=5x8
4.5 Pek. Ringbalk 15 x 15
* Beton 0.315
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5 3 4 5 7 8 9=2x8 10=3x8 11=4x8 12=5x8
- Semen portland 102.690 102.690 Kg 1,340 137,605 - - 137,605
- Pasir Beton 0.171 0.171 m³ 306,000 52,326 - - 52,326
- Batu pecah 2/3/4 cm 0.240 0.240 m³ 591,000 141,899 - - 141,899
* Pembesian 22.687
- Besi beton Polos Ø 10 18.384 18.384 Kg 15,802 290,509 - - 290,509
- Besi beton Polos Ø 6 5.438 5.438 Kg 18,561 100,924 - - 100,924
- Kawat beton 0.340 0.340 Kg 23,000 7,827 - - 7,827
* Bekisting 1.050
- Paku biasa 2" - 5' 0.420 0.420 Kg 22,000 9,240 - - 9,240
- Balok Kayu klas III uk. 5/7 0.019 0.019 m³ 2,800,000 52,920 - - 52,920
- Tripleks 9 mm 0.368 0.368 Lbr 110,000 40,425 - - 40,425
- Bambu 2.089 2.089 - Btg 31,000 64,755 - 64,755 -
E. PEKERJAAN DINDING
5.1 Pas.Batu Merah 1/2 (1:2) 18.450
- Bata merah 1,291.500 1,291.500 Bh 1,000 1,291,500 - - 1,291,500
- Semen Portland 349.628 349.628 Kg 1,340 468,501 - - 468,501
- Pasir pasang 0.701 0.701 m³ 242,000 169,666 - - 169,666
F. PEKERJAAN PINTU
6.1 Pekerjaan Pintu dan Jendela
- Kusen Pintu 1.000 1.000 Bh 668,000 668,000 - - 668,000
- Daun Pintu 1.000 1.000 Bh 757,000 757,000 - - 757,000
- Engsel Kupu kupu 3.000 3.000 Bh 39,000 117,000 - - 117,000
- Kunci Tanam 1.000 1.000 Bh 223,000 223,000 - - 223,000
6.2 Pengecatan Bidang Kayu baru 1.520
- Cat meni 0.304 0.304 Kg 47,000 14,288 - - 14,288
- Plamir Kayu 0.228 0.228 Kg 9,000 2,052 - - 2,052
- Cat dasar 0.258 0.258 Kg 58,000 14,987 - - 14,987
- Cat penutup 2 kali 0.395 0.395 Kg 58,000 22,922 - - 22,922
G. PEKERJAAN FINISHING
7.1 Pek. Plesteran 1:2 36.900
- Semen Portland 503.021 503.021 Kg 1,340 674,048 - - 674,048
- Pasir pasang 0.996 0.996 m³ 242,000 241,105 - - 241,105
7.2 Pek. Acian 36.900
- Semen Portland 119.925 119.925 Kg 1,340 160,700 - - 160,700
7.3 Pek. Pengecatan 36.900
- Plamir tembok 3.690 3.690 Kg 9,000 33,210 - - 33,210
- Cat dasar 1 kali 3.690 3.690 Kg 105,000 387,450 - - 387,450
- Cat penutup 2 kali 9.594 9.594 Kg 105,000 1,007,370 - - 1,007,370

Sub Total 1) 13,286,072 - 680,858 12,605,214


Dibulatkan 13,287,000 - 681,000 12,605,000
2 UPAH
A. PEKERJAAN PENDAHULUAN
1.1 Membersihkan Lapangan dan Peralatan 4.00
- Pekerja 0.400 0.400 - Hok 100,000 40,000 - 40,000 -
1.2 Pemasangan Bowplank 4.000
- Pekerja 0.400 0.400 - Hok 100,000 40,000 - 40,000 -
- Tukang 0.400 0.400 - Hok 120,000 48,000 - 48,000 -
B. PEKERJAAN TANAH
2.1 Pek. Galian Pondasi 2.503
- Pekerja - - - Hok 100,000 - - - -
2.2 Pek. Urugan Pasir dibawah Pondasi 0.228
- Pekerja 0.068 0.068 - Hok 100,000 6,825 - 6,825 -
2.3 Pek. Urugan Pasir dibawah Lantai 0.204
- Pekerja 0.061 0.061 - Hok 100,000 6,120 - 6,120 -
2.4 Urugan Kembali 1.146
- Pekerja 0.286 0.286 - Hok 100,000 28,648 - 28,648 -
C. PEKERJAAN PONDASI BATU GUNUNG
3.1 Pas. Batu Kosong (anstamping) 0.910
- Pekerja 0.710 - 0.710 Hok 100,000 70,980 - - 70,980
- Tukang 0.355 - 0.355 Hok 120,000 42,588 - - 42,588
3.2 Pas. Pondasi Batu Belah (1 : 3) 1.225
- Pekerja 1.838 - 1.838 Hok 100,000 183,750 - - 183,750
- Tukang 0.918 - 0.918 Hok 120,000 110,144 - - 110,144
D. PEKERJAAN BETON
4.1 Pek. Lantai Kerja t. 5 cm
* Beton 0.102
- Pekerja 0.168 - 0.168 Hok 100,000 16,830 - - 16,830
- Tukang 0.028 - 0.028 Hok 120,000 3,366 - - 3,366
4.2 Pek. Kolom 15 x 15
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5 3 4 5 7 8 9=2x8 10=3x8 11=4x8 12=5x8
* Beton 0.270
- Pekerja 0.446 - 0.446 Hok 100,000 44,550 - - 44,550
- Tukang 0.074 - 0.074 Hok 120,000 8,910 - - 8,910
* Pembesian 19.728
- Pekerja 0.138 - 0.138 Hok 100,000 13,810 - - 13,810
- Tukang 0.138 - 0.138 Hok 120,000 16,572 - - 16,572
* Bekisting 1.800
- Pekerja 1.188 - 1.188 Hok 100,000 118,800 - - 118,800
- Tukang 0.594 0.594 Hok 120,000 71,280 - - 71,280
4.3 Pek. Sloef 15 x 15
* Beton 0.315
- Pekerja 0.520 - 0.520 Hok 100,000 51,975 - - 51,975
- Tukang 0.087 - 0.087 Hok 120,000 10,395 - - 10,395
* Pembesian 22.687
- Pekerja 0.159 - 0.159 Hok 100,000 15,881 - - 15,881
- Tukang 0.159 0.159 Hok 120,000 19,057 - - 19,057
* Bekisting 1.050
- Pekerja 0.693 - 0.693 Hok 100,000 69,300 - - 69,300
- Tukang 0.347 0.347 Hok 120,000 41,580 - - 41,580
4.4 Pek. Plat Atap t. 12 cm
* Beton 1.037
- Pekerja 1.711 - 1.711 Hok 100,000 171,102 - - 171,102
- Tukang 0.285 - 0.285 Hok 120,000 34,220 - - 34,220
* Pembesian 39.324
- Pekerja 0.275 - 0.275 Hok 100,000 27,527 - - 27,527
- Tukang 0.275 0.275 Hok 120,000 33,033 - - 33,033
* Bekisting 2.850
- Pekerja 1.881 - 1.881 Hok 100,000 188,074 - - 188,074
- Tukang 0.470 0.470 Hok 120,000 56,422 - - 56,422
4.5 Pek. Ringbalk 15 x 15
* Beton 0.315
- Pekerja 0.520 - 0.520 Hok 100,000 51,975 - - 51,975
- Tukang 0.087 - 0.087 Hok 120,000 10,395 - - 10,395
* Pembesian 22.687
- Pekerja 0.159 - 0.159 Hok 100,000 15,881 - - 15,881
- Tukang 0.159 0.159 Hok 120,000 19,057 - - 19,057
* Bekisting 1.050
- Pekerja 0.693 - 0.693 Hok 100,000 69,300 - - 69,300
- Tukang 0.347 0.347 Hok 120,000 41,580 - - 41,580
E. PEKERJAAN DINDING
5.1 Pas.Batu Merah 1/2 (1:2) 18.450
- Pekerja 5.535 - 5.535 Hok 100,000 553,500 - - 553,500
- Tukang 1.845 1.845 Hok 120,000 221,400 - - 221,400
F. PEKERJAAN PINTU DAN JENDELA
6.1 Pengecatan Bidang Kayu baru 1.520
- Pekerja 0.106 - 0.106 Hok 100,000 10,640 - - 10,640
- Tukang 0.014 - 0.014 Hok 120,000 1,642 - - 1,642
G. PEKERJAAN FINISHING
7.1 Pek. Plesteran 1:2 36.900
- Pekerja 14.760 - 14.760 Hok 100,000 1,476,000 - - 1,476,000
- Tukang 7.380 - 7.380 Hok 120,000 885,600 - - 885,600
7.2 Acian 36.900
- Pekerja 7.380 - 7.380 Hok 100,000 738,000 - - 738,000
- Tukang 3.690 3.690 Hok 120,000 442,800 - - 442,800
7.3 Pengecetan 36.900
- Pekerja 0.738 - 0.738 Hok 100,000 73,800 - - 73,800
- Tukang 2.325 - 2.325 Hok 120,000 278,964 - - 278,964
Sub Total 2) 6,480,272 - 169,593 6,310,679
Dibulatkan 6,480,000 - 170,000 6,311,000
Jumlah Total) 19,767,000 - 851,000 18,916,000
Alelebbae, Desember 2019
Disetujui Oleh : Dibuat Oleh :
Ketua DPMU Kabupaten Wajo KKM "ALELEBBAE" Fasilitator Masyarakat Pelaksana Pamsimas

( MUH. TAUFIQ, ST ) ( ABDUL HAMID ) (GULBUDIN HEMATIAR, ST ) ( SAHARUDDIN )


NIP : 19750717 2009 02 1003 Koordinator FM - WSS Ketua SATLAK
DAFTAR ANALISA TAHUN ANGGARAN 2014
KABUPATEN WAJO

SNI 2835:2008
Menggali 1 m3 tanah biasa sedalam 1 meter
0.7500 Pekerja x Rp. - Rp. -
0.0250 Mandor x Rp. - Rp. -
Jumlah Rp. -

SNI 2835:2008
Menggali 1 m3 tanah biasa sedalam 2 meter
0.9000 Pekerja x Rp. - Rp. -
0.0450 Mandor x Rp. - Rp. -
Jumlah Rp. -

SNI 2835:2008
Menggali 1 m3 tanah biasa sedalam 3 meter
1.0500 Pekerja x Rp. - Rp. -
0.0670 Mandor x Rp. - Rp. -
Jumlah Rp. -

SNI 2835:2008
Menggali 1 m3 tanah keras sedalam 1 meter
1.0000 Pekerja x Rp. - Rp. -
0.0320 Mandor x Rp. - Rp. -
Jumlah Rp. -

SNI 2835:2008
Menggali 1 m3 tanah lumpur sedalam 1 meter
1.2000 Pekerja x Rp. - Rp. -
0.0450 Mandor x Rp. - Rp. -
Jumlah Rp. -

SNI 2835:2008
Menggali 1 m3 Tanah cadas sedalam 1 meter
1.5000 Pekerja x Rp. - Rp. -
0.0600 Mandor x Rp. - Rp. -
Jumlah Rp. -

SNI 2835:2008
Mengerjakan 1 m2 Stripping tebing setinggi 1 meter
0.0500 Pekerja x Rp. - Rp. -
0.0050 Mandor x Rp. - Rp. -
Jumlah Rp. -

SNI 2835:2008
Membuang 1 m3 Tanah sejauh 15 meter
0.3300 Pekerja x Rp. - Rp. -
0.0100 Mandor x Rp. - Rp. -
Jumlah Rp. -

SNI 2835:2008
Mengurug Kembali 1 m3 galian (1/3 indeks pek.Galian)
0.2500 Pekerja x Rp. - Rp. -
0.0083 Mandor x Rp. - Rp. -
Jumlah Rp. -

SNI 2835:2008
Memadatkan 1 m3 tanah (per 20 cm)
0.5000 Pekerja x Rp. - Rp. -
0.0500 Mandor x Rp. - Rp. -
Jumlah Rp. -

SNI 2835:2008
Mengurug 1 m3 Pasir Urug
1.2000 M3 Pasir Timbunan x Rp. - Rp. -
0.3000 Pekerja x Rp. - Rp. -
0.0100 Mandor x Rp. - Rp. -
Jumlah Rp. -
- hal. 01 -
1 m3 Pek. Timbunan Sirtu
1.2000 M3 Sirtu x Rp. - Rp. -
0.3000 Pekerja x Rp. - Rp. -
0.0100 Mandor x Rp. - Rp. -
Jumlah Rp. -

SNI 2835:2008
Mengurug 1 m3 sirtu padat untuk penginggian lantai bangunan
1.2000 M3 Sirtu x Rp. - Rp. -
0.2500 Pekerja x Rp. - Rp. -
0.0250 Mandor x Rp. - Rp. -
Jumlah Rp. -

1 m3 Pek. Urugan Pasir Bawah Pondasi / Lantai


1.2000 M3 Pasir Urug x Rp. - Rp. -
0.3000 Pekerja x Rp. - Rp. -
0.0100 Mandor x Rp. - Rp. -
Jumlah Rp. -

SNI 2836:2008
Memasang 1 m3 batu kosong (anstamping)
1.2000 M3 Batu Kali (batu belah 15/20 cm x Rp. - Rp. -
0.4320 M3 Pair Uurg x Rp. - Rp. -
0.7800 Pekerja x Rp. - Rp. -
0.3900 Tukang Batu x Rp. - Rp. -
0.0390 Kepala Tukang x Rp. - Rp. -
0.0390 Mandor x Rp. - Rp. -
Jumlah Rp. -

SNI 2836:2008
Memasang 1 m3 pondasi batu belah, campuran 1 PC : 3 PP
1.2000 M3 Batu Kali (batu belah 15/20 cm x Rp. - Rp. -
4.0400 Zak Semen 50 Kg x Rp. - Rp. -
0.4850 M3 Pasir Pasangan x Rp. - Rp. -
0.7500 Tukang Batu x Rp. - Rp. -
0.0750 Kepala Tukang x Rp. - Rp. -
1.5000 Pekerja x Rp. - Rp. -
0.0750 Mandor x Rp. - Rp. -
Jumlah Rp. -

SNI 2836:2008
Memasang 1 m3 pondasi batu belah, campuran 1 PC : 4 PP
1.2000 M3 Batu Kali (batu belah 15/20 cm x Rp. - Rp. -
3.2600 Zak Semen 50 Kg x Rp. - Rp. -
0.5220 M3 Pasir Pasangan x Rp. - Rp. -
0.7500 Tukang Batu x Rp. - Rp. -
0.0750 Kepala Tukang x Rp. - Rp. -
1.5000 Pekerja x Rp. - Rp. -
0.0750 Mandor x Rp. - Rp. -
Jumlah Rp. -

SNI 2836:2008
Memasang 1 m3 Pondasi batu belah, campuran 1 PC : 5 PP
1.2000 M3 Batu Kali (batu belah 15/20 cm x Rp. - Rp. -
2.7200 Zak Semen 50 Kg x Rp. - Rp. -
0.5440 M3 Pasir Pasangan x Rp. - Rp. -
0.7500 Tukang Batu x Rp. - Rp. -
0.0750 Kepala Tukang x Rp. - Rp. -
1.5000 Pekerja x Rp. - Rp. -
0.0750 Mandor x Rp. - Rp. -
Jumlah Rp. -

- hal. 02 -
SNI 2836:2008
Memasang 1 m3 Pondasi batu belah, campuran 1 PC : 8 PP
1.2000 M3 Batu Gunung x Rp. - Rp. -
2.3400 zak Semen 50 Kg x Rp. - Rp. -
0.5610 M3 Pasir Pasangan x Rp. - Rp. -
1.5000 Tukang Batu x Rp. - Rp. -
0.7500 Kepala Tukang x Rp. - Rp. -
0.0750 Pekerja x Rp. - Rp. -
0.0750 Mandor x Rp. - Rp. -
Jumlah Rp. -

SNI 6987:2008
Memasang 1 m2 dinding bata merah ukuran (5x11x22) cm tebal 1/2 bata, Campuran spesi 1 PC : 2 PP
70.0000 Biji Batu Bata x Rp. - Rp. -
0.3790 Zak Semen 50 Kg x Rp. - Rp. -
0.0380 M3 Pasir Pasangan x Rp. - Rp. -
0.1000 Tukang Batu x Rp. - Rp. -
0.0100 Kepala Tukang x Rp. - Rp. -
0.3000 Pekerja x Rp. - Rp. -
0.0150 Mandor x Rp. - Rp. -
Jumlah Rp. -

SNI 6987:2008
Memasang 1 m2 dinding bata merah ukuran (5x11x22) cm tebal 1/2 bata, Campuran spesi 1 PC : 4 PP
70.0000 Biji Batu Bata x Rp. - Rp. -
0.2300 Zak Semen 50 Kg x Rp. - Rp. -
0.0430 M3 Pasir Pasangan x Rp. - Rp. -
0.1000 Tukang Batu x Rp. - Rp. -
0.0100 Kepala Tukang x Rp. - Rp. -
0.3000 Pekerja x Rp. - Rp. -
0.0150 Mandor x Rp. - Rp. -
Jumlah Rp. -

SNI 6987:2008
Memasang 1 m2 dinding bata merah ukuran (5x11x22) cm tebal 1/2 bata, Campuran spesi 1 PC : 3 PP
70.0000 Biji Batu Bata x Rp. - Rp. -
0.2874 Zak Semen 50 Kg x Rp. - Rp. -
0.0400 M3 Pasir Pasangan x Rp. - Rp. -
0.1000 Tukang Batu x Rp. - Rp. -
0.0100 Kepala Tukang x Rp. - Rp. -
0.3000 Pekerja x Rp. - Rp. -
0.0150 Mandor x Rp. - Rp. -
Jumlah Rp. -

SNI 6987:2008
Memasang 1 m2 dinding bata merah ukuran (5x11x22) cm tebal 1/2 bata, Campuran spesi 1 PC : 5 PP
70.0000 Biji Batu Bata x Rp. - Rp. -
0.1936 Zak Semen 50 Kg x Rp. - Rp. -
0.0450 M3 Pasir Pasangan x Rp. - Rp. -
0.1000 Tukang Batu x Rp. - Rp. -
0.0100 Kepala Tukang x Rp. - Rp. -
0.3000 Pekerja x Rp. - Rp. -
0.0150 Mandor x Rp. - Rp. -
Jumlah Rp. -

SNI 6987:2008
Memasang 1 m2 dinding Concrete Block 20, Campuran 1 PC : 3 PP
12.5000 Biji Batu Batako x Rp. - Rp. -
0.6064 Zak Semen 50 Kg x Rp. - Rp. -
0.7280 M3 Pasir Pasangan x Rp. - Rp. -
0.1500 Tukang Batu x Rp. - Rp. -
0.0150 Kepala Tukang x Rp. - Rp. -
0.3500 Pekerja x Rp. - Rp. -
0.0180 Mandor x Rp. - Rp. -
Jumlah Rp. -
- hal. 03 -
SNI 6987:2008
Memasang 1 m2 dinding Concrete Block 20, Campuran 1 PC : 4 PP
12.5000 Biji Batu Batako x Rp. - Rp. -
0.4852 Zak Semen 50 Kg x Rp. - Rp. -
0.7720 M3 Pasir Pasangan x Rp. - Rp. -
0.1500 Tukang Batu x Rp. - Rp. -
0.0150 Kepala Tukang x Rp. - Rp. -
0.3500 Pekerja x Rp. - Rp. -
0.0180 Mandor x Rp. - Rp. -
Jumlah Rp. -

SNI 7394:2008
Membuat 1 m3 lantai kerja beton mutu f'c =7,4 Mpa (K100) slump (3-6) cm, w/c = 0,87
4.6000 Zak Semen 50 Kg x Rp. - Rp. -
0.6379 M 3
Pasir Beton / Kasar x Rp. - Rp. -
0.7607 M3 Batu Pecah 2-3 x Rp. - Rp. -
200 Air x Rp. 100.00 Rp. 20,000.00
0.2000 Tukang Batu x Rp. - Rp. -
0.0200 Kepala Tukang x Rp. - Rp. -
1.2000 Pekerja x Rp. - Rp. -
0.0600 Mandor x Rp. - Rp. -
Jumlah Rp. 20,000.00
SNI 7394:2008
Membuat 1 m3 beton mutu f'c =7,4 Mpa (K100) slump (12+-2) cm, w/c = 0,87
4.9400 Zak Semen 50 Kg x Rp. - Rp. -
0.6207 M3 Pasir Beton / Kasar x Rp. - Rp. -
0.7400 M3 Batu Pecah 2-3 x Rp. - Rp. -
200 Air x Rp. 100.00 Rp. 20,000.00
0.2750 Tukang Batu x Rp. - Rp. -
0.0280 Kepala Tukang x Rp. - Rp. -
1.6500 Pekerja x Rp. - Rp. -
0.0830 Mandor x Rp. - Rp. -
Jumlah Rp. 20,000.00

SNI 7394:2008
Membuat 1 m3 beton mutu f'c =9,8 Mpa (K125) slump (12+-2) cm, w/c = 0,78
5.5200 Zak Semen 50 Kg x Rp. - Rp. -
0.5914 M3 Pasir Beton / Kasar x Rp. - Rp. -
0.7496 M3 Batu Pecah 2-3 x Rp. - Rp. -
200 Air x Rp. 100.00 Rp. 20,000.00
0.2750 Tukang Batu x Rp. - Rp. -
0.0280 Kepala Tukang x Rp. - Rp. -
1.6500 Pekerja x Rp. - Rp. -
0.0830 Mandor x Rp. - Rp. -
Jumlah Rp. 20,000.00

SNI 7394:2008
Membuat 1 m3 beton mutu f'c =12,2 Mpa (K150) slump (12+-2) cm, w/c = 0,72
5.9800 Zak Semen 50 Kg x Rp. - Rp. -
0.5707 M3 Pasir Beton / Kasar x Rp. - Rp. -
0.7533 M3 Batu Pecah 2-3 x Rp. - Rp. -
200 Air x Rp. 100.00 Rp. 20,000.00
0.2750 Tukang Batu x Rp. - Rp. -
0.0280 Kepala Tukang x Rp. - Rp. -
1.6500 Pekerja x Rp. - Rp. -
0.0830 Mandor x Rp. - Rp. -
Jumlah Rp. 20,000.00

SNI 7394:2008
Membuat 1 m3 beton mutu f'c =14,5 Mpa (K175) slump (12+-2) cm, w/c = 0,66
6.5200 Zak Semen 50 Kg x Rp. - Rp. -
0.5429 M3 Pasir Beton / Kasar x Rp. - Rp. -
0.7622 M3 Batu Pecah 2-3 x Rp. - Rp. -
215 Air x Rp. 100.00 Rp. 21,500.00
0.2750 Tukang Batu x Rp. - Rp. -
0.0280 Kepala Tukang x Rp. - Rp. -
1.6500 Pekerja x Rp. - Rp. -
0.0830 Mandor x Rp. - Rp. -
Jumlah Rp. 21,500.00

- hal. 04 -
SNI 7394:2008
Membuat 1 m3 beton mutu f'c =16,9 Mpa (K200) slump (12+-2) cm, w/c = 0,61
7.0400 Zak Semen 50 Kg x Rp. - Rp. -
0.5221 M3 Pasir Beton / Kasar x Rp. - Rp. -
0.7637 M3 Batu Pecah 2-3 x Rp. - Rp. -
215 Air x Rp. 100.00 Rp. 21,500.00
0.2750 Tukang Batu x Rp. - Rp. -
0.0280 Kepala Tukang x Rp. - Rp. -
1.6500 Pekerja x Rp. - Rp. -
0.0830 Mandor x Rp. - Rp. -
Jumlah Rp. 21,500.00

SNI 7394:2008
Membuat 1 m3 beton mutu f'c =19,3 Mpa (K225) slump (12+-2) cm, w/c = 0,58
7.4200 Zak Semen 50 Kg x Rp. - Rp. -
0.4986 M3 Pasir Beton / Kasar x Rp. - Rp. -
0.7756 M3 Batu Pecah 2-3 x Rp. - Rp. -
215 Air x Rp. 100.00 Rp. 21,500.00
0.2750 Tukang Batu x Rp. - Rp. -
0.0280 Kepala Tukang x Rp. - Rp. -
1.6500 Pekerja x Rp. - Rp. -
0.0830 Mandor x Rp. - Rp. -
Jumlah Rp. 21,500.00

SNI 7394:2008
Membuat 1 m3 beton mutu f'c =21,7 Mpa (K250) slump (12+-2) cm, w/c = 0,56
7.6800 Zak Semen 50 Kg x Rp. - Rp. -
0.4943 M3 Pasir Beton / Kasar x Rp. - Rp. -
0.7696 M3 Batu Pecah 2-3 x Rp. - Rp. -
215 Air x Rp. 100.00 Rp. 21,500.00
0.2750 Tukang Batu x Rp. - Rp. -
0.0280 Kepala Tukang x Rp. - Rp. -
1.6500 Pekerja x Rp. - Rp. -
0.0830 Mandor x Rp. - Rp. -
Jumlah Rp. 21,500.00
SNI 7394:2008
Membuat 1 m3 beton mutu f'c =24 Mpa (K275) slump (12+-2) cm, w/c = 0,53
8.1200 Zak Semen 50 Kg x Rp. - Rp. -
0.4886 M3 Pasir Beton / Kasar x Rp. - Rp. -
0.7600 M3 Batu Pecah 2-3 x Rp. - Rp. -
215 Air x Rp. 100.00 Rp. 21,500.00
0.2750 Tukang Batu x Rp. - Rp. -
0.0280 Kepala Tukang x Rp. - Rp. -
1.6500 Pekerja x Rp. - Rp. -
0.0830 Mandor x Rp. - Rp. -
Jumlah Rp. 21,500.00
SNI 7394:2008
Membuat 1 m3 beton mutu f'c =26,4 Mpa (K300) slump (12+-2) cm, w/c = 0,52
8.2600 Zak Semen 50 Kg x Rp. - Rp. -
0.4864 M3 Pasir Beton / Kasar x Rp. - Rp. -
0.7563 M3 Batu Pecah 2-3 x Rp. - Rp. -
215 Air x Rp. 100.00 Rp. 21,500.00
0.2750 Tukang Batu x Rp. - Rp. -
0.0280 Kepala Tukang x Rp. - Rp. -
1.6500 Pekerja x Rp. - Rp. -
0.0830 Mandor x Rp. - Rp. -
Jumlah Rp. 21,500.00

SNI 7394:2008
Membuat 1 m3 beton mutu f'c =28,8 Mpa (K325) slump (12+-2) cm, w/c = 0,49
8.7800 Zak Semen 50 Kg x Rp. - Rp. -
0.4786 M3 Pasir Beton / Kasar x Rp. - Rp. -
0.7452 M3 Batu Pecah 2-3 x Rp. - Rp. -
215 Air x Rp. 100.00 Rp. 21,500.00
0.3500 Tukang Batu x Rp. - Rp. -
0.0350 Kepala Tukang x Rp. - Rp. -
2.1000 Pekerja x Rp. - Rp. -
0.1050 Mandor x Rp. - Rp. -
Jumlah Rp. 21,500.00

- hal. 05 -
SNI 7394:2008
Membuat 1 m3 beton mutu f'c =31,2 Mpa (K350) slump (12+-2) cm, w/c = 0,52 (A)
8.9600 Zak Semen 50 Kg x Rp. - Rp. -
0.4764 M3 Pasir Beton / Kasar x Rp. - Rp. -
0.7407 M3 Batu Pecah 2-3 x Rp. - Rp. -
215 Air x Rp. 100.00 Rp. 21,500.00
0.3500 Tukang Batu x Rp. - Rp. -
0.0350 Kepala Tukang x Rp. - Rp. -
2.1000 Pekerja x Rp. - Rp. -
0.1050 Mandor x Rp. - Rp. -
Jumlah Rp. 21,500.00

SNI 7394:2008
Pembesian 10 kg dengan besi polos atau besi ulir (B)
10.5000 Kg Besi Beton x Rp. - Rp. -
0.1500 Kg Kawat Beton x Rp. - Rp. -
0.0700 Tukang Besi x Rp. - Rp. -
0.0070 Kepala Tukang x Rp. - Rp. -
0.0700 Pekerja x Rp. - Rp. -
0.0040 Mandor x Rp. - Rp. -
Jumlah 10 kg Rp. -
1 kg Rp. -

SNI 7394:2008
Bahan Bekesting (Cetakan) ( C )
Memasang 1 m2 bekesting untuk pondasi
0.0400 M3 Kayu Balok Kls III x Rp. - Rp. -
0.3000 kg Paku 5 cm- 10 cm x Rp. - -
0.1000 ltr Minyak bekesting x Rp. - -
0.2600 Tukang Kayu x Rp. - Rp. -
0.0260 Kepala Tukang x Rp. - Rp. -
0.5200 Pekerja x Rp. - Rp. -
0.0260 Mandor x Rp. - Rp. -
Jumlah Rp. -

SNI 7394:2008
Memasang 1 m2 bekesting untuk Sloof
0.0450 M3 Kayu Balok Kls III x Rp. - Rp. -
0.3000 kg Paku 5 cm- 10 cm x Rp. - -
0.1000 ltr Minyak bekesting x Rp. - -
0.2600 Tukang Kayu x Rp. - Rp. -
0.0260 Kepala Tukang x Rp. - Rp. -
0.5200 Pekerja x Rp. - Rp. -
0.0260 Mandor x Rp. - Rp. -
Jumlah Rp. -

SNI 7394:2008
Memasang 1 m2 bekesting untuk Kolom
0.0400 M3 Kayu Balok Kls III x Rp. - Rp. -
0.4000 kg Paku 5 cm- 12 cm x Rp. - Rp. -
0.2000 ltr Minyak bekesting x Rp. - Rp. -
0.0150 m3 Balok Kayu Kals II x Rp. - Rp. -
0.3500 lbr Plywood tebal 9 mm x Rp. - Rp. -
2.0000 Btg dolken 8-10cm/4m (KlasIII) x Rp. - Rp. -
0.3300 Tukang Kayu x Rp. - Rp. -
0.0330 Kepala Tukang x Rp. - Rp. -
0.6600 Pekerja x Rp. - Rp. -
0.0330 Mandor x Rp. - Rp. -
Jumlah Rp. -

- hal. 06 -
SNI 7394:2008
Memasang 1 m2 bekesting untuk Balok
0.0400 M3 Kayu Balok Kls III x Rp. - Rp. -
0.4000 kg Paku 5 cm- 12 cm x Rp. - Rp. -
0.2000 ltr Minyak bekesting x Rp. - Rp. -
0.0180 m3 Balok Kayu Kals II x Rp. - Rp. -
0.3500 lbr Plywood tebal 9 mm x Rp. - Rp. -
2.0000 Btg dolken 8-10cm/4m (KlasIII) x Rp. - Rp. -
0.3300 Tukang Kayu x Rp. - Rp. -
0.0330 Kepala Tukang x Rp. - Rp. -
0.6600 Pekerja x Rp. - Rp. -
0.0330 Mandor x Rp. - Rp. -
Jumlah Rp. -

SNI 7394:2008
Memasang 1 m2 bekesting untuk plat lantai
0.0400 M3 Kayu Balok Kls III x Rp. - Rp. -
0.4000 kg Paku 5 cm- 12 cm x Rp. - Rp. -
0.2000 ltr Minyak bekesting x Rp. - Rp. -
0.0150 m3 Balok Kayu Kals II x Rp. - Rp. -
0.3500 lbr Plywood tebal 9 mm x Rp. - Rp. -
6.0000 Btg dolken 8-10cm/4m (KlasIII) x Rp. - Rp. -
0.3300 Tukang Kayu x Rp. - Rp. -
0.0330 Kepala Tukang x Rp. - Rp. -
0.6600 Pekerja x Rp. - Rp. -
0.0330 Mandor x Rp. - Rp. -
Jumlah Rp. -

SNI 7394:2008
Memasang 1 m2 bekesting untuk dinding
0.0300 M3 Kayu Balok Kls III x Rp. - Rp. -
0.4000 kg Paku 5 cm- 12 cm x Rp. - Rp. -
0.2000 ltr Minyak bekesting x Rp. - Rp. -
0.0200 m3 Balok Kayu Kals II x Rp. - Rp. -
0.3500 lbr Plywood tebal 9 mm x Rp. - Rp. -
3.0000 Btg dolken 8-10cm/4m (KlasIII) x Rp. - Rp. -
0.3300 Tukang Kayu x Rp. - Rp. -
0.0330 Kepala Tukang x Rp. - Rp. -
0.6600 Pekerja x Rp. - Rp. -
0.0330 Mandor x Rp. - Rp. -
Jumlah Rp. -

SNI 7394:2008
Memasang 1 m2 bekesting untuk tangga
0.0300 M3 Kayu Balok Kls III x Rp. - Rp. -
0.4000 kg Paku 5 cm- 12 cm x Rp. - Rp. -
0.1500 ltr Minyak bekesting x Rp. - Rp. -
0.0150 m3 Balok Kayu Kals II x Rp. - Rp. -
0.3500 lbr Plywood tebal 9 mm x Rp. - Rp. -
2.0000 Btg dolken 8-10cm/4m (KlasIII) x Rp. - Rp. -
0.3300 Tukang Kayu x Rp. - Rp. -
0.0330 Kepala Tukang x Rp. - Rp. -
0.6600 Pekerja x Rp. - Rp. -
0.0330 Mandor x Rp. - Rp. -
Jumlah Rp. -

SNI 7394:2008
Memasang 1 m2 Jembatan untuk Pengecoran beton
0.0264 M3 Kayu Balok Kls III x Rp. - Rp. -
0.6000 kg Paku 5 cm- 12 cm x Rp. - Rp. -
0.1500 ltr Minyak bekesting x Rp. - Rp. -
0.5000 Btg dolken 8-10cm/4m (KlasIII) x Rp. - Rp. -
0.0500 Tukang Kayu x Rp. - Rp. -
0.0050 Kepala Tukang x Rp. - Rp. -
0.1500 Pekerja x Rp. - Rp. -
0.0080 Mandor x Rp. - Rp. -
Jumlah Rp. -

- hal. 07 -
SNI 7394:2008
Membuat 1 m3 pondasi beton bertulang (150 kg besi+bekesting)
Beton
bahan
6.7200 zak Semen 50 Kg x Rp. - Rp. -
0.5400 m3 Pasir beton' x Rp. - Rp. -
0.8100 m3 kerikil x Rp. - Rp. -
upah
0.2750 Tukang Batu x Rp. - Rp. -
0.2620 Kepala Tukang x Rp. - Rp. -
5.3000 Pekerja x Rp. - Rp. -
0.2650 Mandor x Rp. - Rp. -
Rp. -
Besi 150 kg
bahan
157.5000 kg Besi beton polos x Rp. - Rp. -
2.2500 kg kawat beton x Rp. - Rp. -
Upah
1.0500 Tukang Besi x Rp. - Rp. -
Rp. -

Bekesting
bahan
0.2000 M3 Kayu Balok Kls III x Rp. - Rp. -
1.5000 kg Paku 5 cm- 12 cm x Rp. - Rp. -
0.4000 ltr Minyak bekesting x Rp. - Rp. -
Upah Rp.
1.3000 Tukang Kayu x Rp. - Rp. -
Rp. -

Jumlah Total Rp. -

SNI 7394:2008
Membuat 1 m3 sloof beton bertulang (200 kg besi+bekesting)
Beton
bahan
6.7200 zak Semen 50 Kg x Rp. - Rp. -
0.5400 m3 Pasir beton' x Rp. - Rp. -
0.8100 m3 kerikil x Rp. - Rp. -
upah
0.2750 Tukang Batu x Rp. - Rp. -
0.3230 Kepala Tukang x Rp. - Rp. -
5.6500 Pekerja x Rp. - Rp. -
0.2830 Mandor x Rp. - Rp. -
Rp. -
Besi 200 kg
bahan
210.0000 kg Besi beton polos x Rp. - Rp. -
3.0000 kg kawat beton x Rp. - Rp. -
Upah
1.4000 Tukang Besi x Rp. - Rp. -
Rp. -

Bekesting
bahan
0.2000 M3 Kayu Balok Kls III x Rp. - Rp. -
1.5000 kg Paku 5 cm- 12 cm x Rp. - Rp. -
0.4000 ltr Minyak bekesting x Rp. - Rp. -
Upah Rp.
1.3000 Tukang Kayu x Rp. - Rp. -
Rp. -

Jumlah Total Rp. -

- hal. 08 -
SNI 7394:2008
Membuat 1 m3 Kolom beton bertulang (300 kg besi+bekesting)
Beton
bahan
6.7200 zak Semen 50 Kg x Rp. - Rp. -
0.5400 m3 Pasir beton' x Rp. - Rp. -
0.8100 m3 kerikil x Rp. - Rp. -
upah
0.2750 Tukang Batu x Rp. - Rp. -
0.4030 Kepala Tukang x Rp. - Rp. -
7.0500 Pekerja x Rp. - Rp. -
0.3530 Mandor x Rp. - Rp. -
Rp. -
Besi 300 kg
bahan
315.0000 kg Besi beton polos x Rp. - Rp. -
4.5000 kg kawat beton x Rp. - Rp. -
Upah
2.1000 Tukang Besi x Rp. - Rp. -
Rp. -

Bekesting
bahan
0.1500 M3 Kayu Klas II x Rp. - Rp. -
0.4000 M3 Kayu Balok Kls III x Rp. - Rp. -
4.0000 kg Paku 5 cm- 12 cm x Rp. - Rp. -
2.0000 ltr Minyak bekesting x Rp. - Rp. -
20.0000 bt dolken 8-10 cm (klas III) x Rp. - Rp. -
Upah
1.6500 Tukang Kayu x Rp. - Rp. -
Rp. -

Jumlah Total Rp. -

SNI 7394:2008
Membuat 1 m3 balok beton bertulang (200 kg besi+bekesting)
Beton
bahan
6.7200 zak Semen 50 Kg x Rp. - Rp. -
0.5400 m3 Pasir beton' x Rp. - Rp. -
0.8100 m3 kerikil x Rp. - Rp. -
upah
0.2750 Tukang Batu x Rp. - Rp. -
0.3330 Kepala Tukang x Rp. - Rp. -
6.3500 Pekerja x Rp. - Rp. -
0.3180 Mandor x Rp. - Rp. -
Rp. -
Besi 200 kg
bahan
210.0000 kg Besi beton polos x Rp. - Rp. -
3.0000 kg kawat beton x Rp. - Rp. -
Upah -
1.4000 Tukang Besi x Rp. - Rp. -
Rp. -

Bekesting
bahan
0.15 Kayu Klas II x Rp. - Rp. -
0.3000 M3 Kayu Balok Kls III x Rp. - Rp. -
4.0000 kg Paku 5 cm- 12 cm x Rp. - Rp. -
2.0000 ltr Minyak bekesting x Rp. - Rp. -
Upah
1.6500 Tukang Kayu x Rp. - Rp. -
Rp. -

Jumlah Total Rp. -

- hal. 09 -
SNI 7394:2008
Membuat 1 m3 Plat beton bertulang (150 kg besi+bekesting)
Beton
bahan
6.7200 zak Semen 50 Kg x Rp. - Rp. -
0.5400 m3 Pasir beton' x Rp. - Rp. -
0.8100 m3 kerikil x Rp. - Rp. -
upah -
0.2750 Tukang Batu x Rp. - Rp. -
0.2650 Kepala Tukang x Rp. - Rp. -
5.3000 Pekerja x Rp. - Rp. -
0.2650 Mandor x Rp. - Rp. -
Rp. -
Besi 200 kg
bahan
157.5000 kg Besi beton polos x Rp. - Rp. -
2.2500 kg kawat beton x Rp. - Rp. -
Upah
1.0500 Tukang Besi x Rp. - Rp. -
Rp. -

Bekesting
bahan
0.15 Kayu Klas II x Rp. - Rp. -
0.3000 M3 Kayu Balok Kls III x Rp. - Rp. -
4.0000 kg Paku 5 cm- 12 cm x Rp. - Rp. -
2.0000 ltr Minyak bekesting x Rp. - Rp. -
Upah
1.6500 Tukang Kayu x Rp. - Rp. -
Rp. -

Jumlah Total Rp. -

SNI 7394:2008
Membuat 1 m3 Dinding beton bertulang (150 kg besi+bekesting)
Beton
bahan
6.7200 zak Semen 50 Kg x Rp. - Rp. -
0.5400 m3 Pasir beton' x Rp. - Rp. -
0.8100 m3 kerikil x Rp. - Rp. -
upah
0.2750 Tukang Batu x Rp. - Rp. -
0.2620 Kepala Tukang x Rp. - Rp. -
5.3000 Pekerja x Rp. - Rp. -
0.2650 Mandor x Rp. - Rp. -
Rp. -
Besi 200 kg
bahan
157.5000 kg Besi beton polos x Rp. - Rp. -
2.2500 kg kawat beton x Rp. - Rp. -
Upah
1.0500 Tukang Besi x Rp. - Rp. -
Rp. -

Bekesting
bahan
0.16 Kayu Klas II x Rp. - Rp. -
0.2400 M3 Kayu Balok Kls III x Rp. - Rp. -
3.2000 kg Paku 5 cm- 12 cm x Rp. - Rp. -
1.6000 ltr Minyak bekesting x Rp. - Rp. -
Upah -
1.3000 Tukang Kayu x Rp. - Rp. -
Rp. -

Jumlah Total Rp. -

- hal. 10 -
SNI 7394:2008
Membuat 1 m' kolom praktis beton bertulang (11 x 11) cm
0.0020 M3 Kayu Balok Kls III x Rp. - Rp. -
0.0100 kg Paku 5 cm- 12 cm x Rp. - Rp. -
3.0000 kg Besi beton polos x Rp. - Rp. -
0.0450 kg kawat beton x Rp. - Rp. -
0.0800 zak Semen 50 Kg x Rp. - Rp. -
0.0060 m3 Pasir beton' x Rp. - Rp. -
0.0090 m3 kerikil x Rp. - Rp. -
0.0200 Tukang Batu x Rp. - Rp. -
0.0200 Tukang Kayu x Rp. - Rp. -
0.0200 Tukang Besi x Rp. - Rp. -
0.0060 Kepala Tukang x Rp. - Rp. -
0.1800 Pekerja x Rp. - Rp. -
0.0090 Mandor x Rp. - Rp. -
Jumlah Rp. -
SNI 7394:2008
Membuat 1 m' Ring balok beton bertulang (10 x 15) cm
0.0030 M3 Kayu Balok Kls III x Rp. - Rp. -
0.0200 kg Paku 5 cm- 12 cm x Rp. - Rp. -
3.6000 kg Besi beton polos x Rp. - Rp. -
0.0500 kg kawat beton x Rp. - Rp. -
0.1100 zak Semen 50 Kg x Rp. - Rp. -
0.0090 m3 Pasir beton' x Rp. - Rp. -
0.0150 m3 kerikil x Rp. - Rp. -
0.0330 Tukang Batu x Rp. - Rp. -
0.0330 Tukang Kayu x Rp. - Rp. -
0.0330 Tukang Besi x Rp. - Rp. -
0.0100 Kepala Tukang x Rp. - Rp. -
0.2970 Pekerja x Rp. - Rp. -
0.0150 Mandor x Rp. - Rp. -
Jumlah Rp. -
1 m2 Pek. Paving Block
50.0000 Bh Paving Block 8 cm x Rp. - Rp. -
0.1000 M3 Pasir Pasangan x Rp. - Rp. -
0.1500 Tukang Batu x Rp. - Rp. -
0.6000 Pekerja x Rp. - Rp. -
Jumlah Rp. -
SNI 2837:2008
Memasang 1 m2 plesteran 1 PC : 3 PP, tebal 15 mm
0.1555 Zak Semen Pc 50 Kg x Rp. - Rp. -
0.0230 M3 Pasir Pasangan x Rp. - Rp. -
0.1500 Tukang Batu x Rp. - Rp. -
0.0150 Kepala Tukang x Rp. - Rp. -
0.3000 Pekerja x Rp. - Rp. -
0.0150 Mandor x Rp. - Rp. -
Jumlah Rp. -
SNI 2837:2008
Memasang 1 m2 plesteran 1 PC : 4 PP, tebal 15 mm
0.1248 Zak Semen Pc. 50 Kg x Rp. - Rp. -
0.0240 M3 Pasir Pasangan x Rp. - Rp. -
0.1500 Tukang Batu x Rp. - Rp. -
0.0150 Kepala tukang x Rp. - Rp. -
0.3000 Pekerja x Rp. - Rp. -
0.0150 Mandor x Rp. - Rp. -
Jumlah Rp. -

SNI 2837:2008
Memasang 1 m2 plesteran 1 PC : 5 PP, tebal 15 mm
0.1168 Zak Semen Pc. 50 Kg x Rp. - Rp. -
0.0260 M3 Pasir Pasangan x Rp. - Rp. -
0.1500 Tukang Batu x Rp. - Rp. -
0.0150 Kepala Tukang x Rp. - Rp. -
0.3000 Pekerja x Rp. - Rp. -
0.0150 Mandor x Rp. - Rp. -
Jumlah Rp. -

- hal. 11 -
SNI 2837:2008
Memasang 1 m2 finishing siar pasangan dinding batu bata (=20 m')
0.0622 Zak Semen Pc. 50 Kg x Rp. - Rp. -
0.0750 Tukang Batu x Rp. - Rp. -
0.0080 Kepala Tukang x Rp. - Rp. -
0.1500 Pekerja x Rp. - Rp. -
0.0080 Mandor x Rp. - Rp. -
Jumlah Rp. -

SNI 2837:2008
Memasang 1 m2 finishing siar Pasangan dinding conblock expose (=8m')
0.0320 Zak Semen Pc. 50 Kg x Rp. - Rp. -
0.0350 Tukang Batu x Rp. - Rp. -
0.0040 Kepala Tukang x Rp. - Rp. -
0.0700 Pekerja x Rp. - Rp. -
0.0040 Mandor x Rp. - Rp. -
Jumlah Rp. -

SNI 2837:2008
Memasang 1 m2 finishing siar pasangan batu kali adukan 1 PC:2 PP
0.1268 Zak Semen Pc. 50 Kg x Rp. - Rp. -
0.0120 m3 Pasir Pasangan x Rp. - Rp. -
0.1500 Tukang Batu x Rp. - Rp. -
0.0150 Kepala Tukang x Rp. - Rp. -
0.3000 Pekerja x Rp. - Rp. -
0.0150 Mandor x Rp. - Rp. -
Jumlah Rp. -

SNI 2837:2008
Memasang 1m2 acian
0.0650 Zak Semen 50 kg x Rp. - Rp. -
0.1000 Tukang Batu x Rp. - Rp. -
0.0100 Kepala Tukang x Rp. - Rp. -
0.2000 Pekerja x Rp. - Rp. -
0.0100 Mandor x Rp. - Rp. -
Jumlah Rp. -

SNI 2837:2008
Memasang 1 m2 Lantai keramik ukuran (30x30) cm
0.9892 buah Ubin keramik x Rp. - Rp. -
0.0450 M3 Pasir Pasangan x Rp. - Rp. -
0.2000 Zak Semen 50 kg x Rp. - Rp. -
0.3500 Tukang Batu x Rp. - Rp. -
0.0350 Kepala Tukang x Rp. - Rp. -
0.7000 Pekerja x Rp. - Rp. -
0.0350 Mandor x Rp. - Rp. -
Jumlah Rp. -

SNI 2837:2008
Memasang 1 m2 Lantai keramik ukuran (33x33) cm
0.8333 Dos Ubin keramik x Rp. - Rp. -
0.0450 M3 Pasir Pasangan x Rp. - Rp. -
0.1638 Zak Semen 50 kg x Rp. - Rp. -
0.3500 Tukang Batu x Rp. - Rp. -
0.0350 Kepala Tukang x Rp. - Rp. -
0.7000 Pekerja x Rp. - Rp. -
0.0350 Mandor x Rp. - Rp. -
Jumlah Rp. -

SNI 2837:2008
Memasang 1 m2 Lantai keramik ukuran (20x20) cm
2.2083 Dos Tegel 20 x 20 x Rp. - Rp. -
0.0450 M3 Pasir Pasangan x Rp. - Rp. -
0.2080 Zak Semen 50 kg x Rp. - Rp. -
0.3500 Tukang Batu x Rp. - Rp. -
0.0350 Kepala Tukang x Rp. - Rp. -
0.7000 Pekerja x Rp. - Rp. -
0.0350 Mandor x Rp. - Rp. -
Jumlah Rp. -

- hal. 12 -
SNI 2837:2008
Memasang 1 m2 dinding porselin ukuran (10x20) cm
4.4167 Dos porselin x Rp. - Rp. -
0.0180 M3 Pasir Pasangan x Rp. - Rp. -
0.1860 Zak Semen 50 kg x Rp. - Rp. -
0.4500 Tukang Batu x Rp. - Rp. -
0.0450 Kepala Tukang x Rp. - Rp. -
0.9000 Pekerja x Rp. - Rp. -
0.0450 Mandor x Rp. - Rp. -
Jumlah Rp. -

SNI 2837:2008
Memasang 1 m2 dinding keramik ukuran (20x20) cm
2.2083 Dos Tegel 20 x 20 x Rp. - Rp. -
0.0180 M3 Pasir Pasangan x Rp. - Rp. -
0.1860 Zak Semen 50 kg x Rp. - Rp. -
0.4500 Tukang Batu x Rp. - Rp. -
0.0450 Kepala Tukang x Rp. - Rp. -
0.9000 Pekerja x Rp. - Rp. -
0.0450 Mandor x Rp. - Rp. -
Jumlah Rp. -

1 m2 Pek. Cat Atap Genteng


0.1250 Kg Cat Genteng x Rp. - Rp. -
0.0750 Tukang Cat x Rp. - Rp. -
0.0750 Kepala Tukang x Rp. - Rp. -
0.0500 Pekerja x Rp. - Rp. -
0.0025 Mandor x Rp. - Rp. -
Jumlah Rp. -

1 m2Pek. Cat Atap Seng


0.1250 Kg Cat Meni x Rp. - Rp. -
0.0750 Tukang Cat x Rp. - Rp. -
0.0750 Kepala Tukang x Rp. - Rp. -
0.0500 Pekerja x Rp. - Rp. -
0.0025 Mandor x Rp. - Rp. -
Jumlah Rp. -

SNI 3434:2008
Membuat dan Memasang 1 m3 Kusen Pintu dan kusen jendela kayu klas I
1.1000 M3 Kayu Bayam x Rp. - Rp. -
1.2500 kg pAku 10 cm x Rp. - Rp. -
1.0000 kg Lem Kayu x Rp. 20,000.00 Rp. 20,000.00
21.0000 Tukang Kayu x Rp. - Rp. -
2.1000 Kepala Tukang x Rp. - Rp. -
7.0000 Pekerja x Rp. - Rp. -
0.3500 Mandor x Rp. - Rp. -
Jumlah Rp. 20,000.00

SNI 3434:2008
Membuat dan Memasang 1 m3 Kusen Pintu dan kusen jendela kayu klas II
1.2000 M3 Kayu klas II x Rp. - Rp. -
1.2500 kg pAku 10 cm x Rp. - Rp. -
1.0000 kg Lem Kayu x Rp. 20,000.00 Rp. 20,000.00
18.0000 Tukang Kayu x Rp. - Rp. -
1.8000 Kepala Tukang x Rp. - Rp. -
6.0000 Pekerja x Rp. - Rp. -
0.3000 Mandor x Rp. - Rp. -
Jumlah Rp. 20,000.00

- hal. 13 -
SNI 3434:2008
Membuat dan Memasang 1 m2 Daun Pintu Panel, Kayu Klas I
0.0400 M3 Papan kayu Klas I x Rp. - Rp. -
0.5000 kg Lem Kayu x Rp. 20,000.00 Rp. 10,000.00
3.0000 Tukang Kayu x Rp. - Rp. -
0.3000 Kepala Tukang x Rp. - Rp. -
1.0000 Pekerja x Rp. - Rp. -
0.0500 Mandor x Rp. - Rp. -
Jumlah Rp. 10,000.00

SNI 3434:2008
Membuat dan Memasang 1 m2 Daun Pintu Panel, Kayu Klas II
0.0400 M3 Papan kayu Klas II x Rp. - Rp. -
0.5000 kg Lem Kayu x Rp. 20,000.00 Rp. 10,000.00
3.0000 Tukang Kayu x Rp. - Rp. -
0.3000 Kepala Tukang x Rp. - Rp. -
1.0000 Pekerja x Rp. - Rp. -
0.0500 Mandor x Rp. - Rp. -
Jumlah Rp. 10,000.00

SNI 3434:2008
Memasang 1 m3 Konstruksi kuda2 konvensional, kayu klas II
1.1000 M3 Balok klas II x Rp. - Rp. -
15.0000 kg Besi srip tebal 5 mm x Rp. - Rp. -
5.6000 kg Paku 12 cm x Rp. - Rp. -
12.0000 Tukang Kayu x Rp. - Rp. -
1.2000 Kepala Tukang x Rp. - Rp. -
4.0000 Pekerja x Rp. - Rp. -
0.2000 Mandor x Rp. - Rp. -
Jumlah Rp. -

SNI 3434:2008
Memasang 1 m3 Konstruksi kuda2 konvensional, kayu klas I
1.2000 M3 Kayu Kls I x Rp. - Rp. -
15.0000 kg Besi srip tebal 5 mm x Rp. - Rp. -
5.6000 kg Paku 12 cm x Rp. - Rp. -
20.1000 Tukang Kayu x Rp. - Rp. -
2.0100 Kepala Tukang x Rp. - Rp. -
6.7000 Pekerja x Rp. - Rp. -
0.3350 Mandor x Rp. - Rp. -
Jumlah Rp. -

SNI 3434:2008
Memasang 1 m3 Konstruksi Gording , kayu klas II
1.1000 M3 Kayu Kls II x Rp. - Rp. -
15.0000 kg Besi srip tebal 5 mm x Rp. - Rp. -
3.0000 kg Paku 12 cm x Rp. - Rp. -
7.2000 Tukang Kayu x Rp. - Rp. -
0.7200 Kepala Tukang x Rp. - Rp. -
2.4000 Pekerja x Rp. - Rp. -
0.1200 Mandor x Rp. - Rp. -
Jumlah Rp. -

1 m2 Pek. Pasangan Rangka Atap ( Baja Ringan )


1.0000 M 2 Baja Zincalum x Rp. - Rp. -
0.0200 Kg Paku Klem x Rp. - Rp. -
0.0100 M 2 Plat Sambungan x Rp. - Rp. -
0.0800 Tukang x Rp. - Rp. -
0.0400 Kepala Tukang x Rp. - Rp. -
0.1000 Pekerja x Rp. - Rp. -
0.0500 Mandor x Rp. - Rp. -
Jumlah Rp. -

- hal. 14 -
1 m2 Pek. Atap Seng BJLS 20
6.0000 Kk Seng BJLS 20 (6kk) x Rp. - Rp. -
0.0400 Kg Paku Seng x Rp. - Rp. -
0.2000 Tukang Kayu x Rp. - Rp. -
0.0200 Kepala Tukang x Rp. - Rp. -
0.1000 Pekerja x Rp. - Rp. -
0.0500 Mandor x Rp. - Rp. -
Jumlah Rp. -

1 m2 Pek. Atap Seng BJLS 0,35


6.0000 Kk Seng BJLS 0,35 x Rp. - RP. -
0.0400 Kg Paku Seng x Rp. - RP. -
0.2000 Tukang Kayu x Rp. - RP. -
0.0200 Kepala Tukang x Rp. - RP. -
0.1000 Pekerja x Rp. - RP. -
0.0500 Mandor x Rp. - RP. -
Jumlah RP. -

1 m1 Pek. Bumbungan Seng


0.3000 Lbr Seng Plat BJLS 20 x Rp. - Rp. -
0.0200 Kg Paku Seng x Rp. - Rp. -
0.0250 Tukang Kayu x Rp. - Rp. -
0.0250 Pekerja x Rp. - Rp. -
0.0025 Mandor x Rp. - Rp. -
Jumlah Rp. -

1 m2 Pek. Atap Genteng Beton


9.0000 Bh Genteng Beton x Rp. - Rp. -
0.1000 Tukang Kayu x Rp. - Rp. -
0.0100 Kepala Tukang x Rp. - Rp. -
0.2000 Pekerja x Rp. - Rp. -
0.0100 Mandor x Rp. - Rp. -
Jumlah Rp. -

1 m1 Pek. Bumbungan Genteng Beton


3.0000 Bh Bumbungan Genteng Beton x Rp. - Rp. -
0.0100 Tukang Kayu x Rp. - Rp. -
0.0200 Pekerja x Rp. - Rp. -
0.0200 Mandor x Rp. - Rp. -
Jumlah Rp. -

1 m2 Pek. Atap Metal Sakura Roof


1.6000 m² Atap Metal Sakura Roof x Rp. - Rp. -
0.0400 Kg Paku Seng x Rp. - Rp. -
0.2500 Tukang Kayu x Rp. - Rp. -
0.0250 Kepala Tukang x Rp. - Rp. -
0.1500 Pekerja x Rp. - Rp. -
0.0750 Mandor x Rp. - Rp. -
Jumlah Rp. -

1 m1 Pek. Bumbungan Metal Sakura Roof


1.3000 m¹ Bumbungan Metal Sakura Roof x Rp. - Rp. -
0.0200 Kg Paku Seng x Rp. - Rp. -
0.2500 Tukang Kayu x Rp. - Rp. -
0.0250 Kepala Tukang x Rp. - Rp. -
0.1500 Pekerja x Rp. - Rp. -
0.0750 Mandor x Rp. - Rp. -
Jumlah Rp. -

- hal. 15 -
1 m2 Pek. Atap Multi Roof
1.6000 m² Atap Multi Roof x Rp. - Rp. -
0.0400 Kg Paku Seng x Rp. - Rp. -
0.2500 Tukang Kayu x Rp. - Rp. -
0.0250 Kepala Tukang x Rp. - Rp. -
0.1500 Pekerja x Rp. - Rp. -
0.0750 Mandor x Rp. - Rp. -
Jumlah Rp. -

1 m1 Pek. Bumbungan Multi Roof


1.3000 m¹ Bumbungan Multi Roof x Rp. - Rp. -
0.0200 Kg Paku Seng x Rp. - Rp. -
0.2500 Tukang Kayu x Rp. - Rp. -
0.0250 Kepala Tukang x Rp. - Rp. -
0.1500 Pekerja x Rp. - Rp. -
0.0750 Mandor x Rp. - Rp. -
Jumlah Rp. -

1 m2 Pek. Atap Surya Roof


1.6000 m² Atap Surya Roof x Rp. - Rp. -
0.0400 Kg Paku Seng x Rp. - Rp. -
0.2500 Tukang Kayu x Rp. - Rp. -
0.0250 Kepala Tukang x Rp. - Rp. -
0.1500 Pekerja x Rp. - Rp. -
0.0750 Mandor x Rp. - Rp. -
Jumlah Rp. -

1 m1 Pek. Bumbungan Surya Roof


1.3000 m¹ Bumbungan Surya Roof x Rp. - Rp. -
0.0200 Kg Paku Seng x Rp. - Rp. -
0.2500 Tukang Kayu x Rp. - Rp. -
0.0250 Kepala Tukang x Rp. - Rp. -
0.1500 Pekerja x Rp. - Rp. -
0.0750 Mandor x Rp. - Rp. -
Jumlah Rp. -

1 m 2 Pek. Pasangan Atap Genteng Metal.


1.0000 m² Genteng Metal x Rp. - Rp. -
6.0000 Biji Baut Drill x Rp. - Rp. -
0.1000 Tukang Kayu x Rp. - Rp. -
0.0050 Kepala Tukang x Rp. - Rp. -
0.1000 Pekerja x Rp. - Rp. -
0.0050 Mandor x Rp. - Rp. -
Jumlah Rp. -

1 m 2 Pek. Pasangan Karet Pelapis.


1.0000 m² Karet Pelapis. x Rp. - Rp. -
0.1000 Tukang Kayu x Rp. - Rp. -
0.1000 Pekerja x Rp. - Rp. -
Jumlah Rp. 17,250.00

1 m1 Pek. Nok Atap Genteng Metal.


1.0000 m¹ Nok Genteng Metal x Rp. - Rp. -
6.0000 Bh Baut Drill x Rp. - Rp. -
0.0700 Tukang Kayu x Rp. - Rp. -
0.0080 Kepala Tukang x Rp. - Rp. -
0.1500 Pekerja x Rp. - Rp. -
0.0060 Mandor x Rp. - Rp. -
Jumlah Rp. -

- hal. 16 -
1 m2 Pek. Pasangan Atap Policarbonat.
1.0000 m² Atap Policarbonat x Rp. 48,000.00 Rp. 48,000.00
0.0300 Kg Paku biasa. x Rp. - Rp. -
0.0800 Tukang Kayu x Rp. - Rp. -
0.0100 Kepala Tukang x Rp. - Rp. -
0.1500 Pekerja x Rp. - Rp. -
0.0100 Mandor x Rp. - Rp. -
Jumlah Rp. 48,000.00

SNI 3434:2008
Memasang 1 m' lisplank ukuran (3x20) cm. Kayu klas I
0.0108 M3 Papan Bayam x Rp. - Rp. -
0.1000 Kg Paku x Rp. - Rp. -
0.2000 Tukang Kayu x Rp. - Rp. -
0.0200 Kepala Tukang x Rp. - Rp. -
0.1000 Pekerja x Rp. - Rp. -
0.0050 Mandor x Rp. - Rp. -
Jumlah Rp. -

SNI 3434:2008
Memasang 1 m' lisplank ukuran (3x20) cm. Kayu klas II
0.0108 M3 Papan Samarinda x Rp. - Rp. -
0.1000 Kg Paku x Rp. - Rp. -
0.2000 Tukang Kayu x Rp. - Rp. -
0.0200 Kepala Tukang x Rp. - Rp. -
0.1000 Pekerja x Rp. - Rp. -
0.0050 Mandor x Rp. - Rp. -
Jumlah Rp. -

SNI 3434:2008
Memasang 1 m2 rangka langit-langit (50x100) cm, kayu klas II - kaso-kaso (5x7) cm
0.0154 M3 Kaso-kaso (5x7) cm x Rp. - Rp. -
0.2000 Kg Paku x Rp. - Rp. -
0.3000 Tukang Kayu x Rp. - Rp. -
0.0300 Kepala Tukang x Rp. - Rp. -
0.1500 Pekerja x Rp. - Rp. -
0.0750 Mandor x Rp. - Rp. -
Jumlah Rp. -

SNI 3434:2008
Memasang 1 m2 rangka langit-langit (50x100) cm, kayu klas III - kaso-kaso (5x7) cm
0.0154 M3 Kaso-kaso (5x7) cm x Rp. - Rp. -
0.2000 Kg Paku x Rp. - Rp. -
0.3000 Tukang Kayu x Rp. - Rp. -
0.0300 Kepala Tukang x Rp. - Rp. -
0.1500 Pekerja x Rp. - Rp. -
0.0750 Mandor x Rp. - Rp. -
Jumlah Rp. -

SNI 3434:2008
Memasang 1 m2 rangka langit-langit (60x60) cm, kayu klas II
0.0163 M3 Kaso-kaso (5x7) cm x Rp. - Rp. -
0.2500 Kg Paku x Rp. - Rp. -
0.3000 Tukang Kayu x Rp. - Rp. -
0.0300 Kepala Tukang x Rp. - Rp. -
0.2000 Pekerja x Rp. - Rp. -
0.0100 Mandor x Rp. - Rp. -
Jumlah Rp. -
SNI 3434:2008
Memasang 1 m2 rangka rangka atap genteng keramik, kayu klas II
0.0140 M3 Kaso-kaso (5x7) cm x Rp. - Rp. -
0.0036 M3 Reng (2x3) cm x Rp. - Rp. -
0.2500 Kg Paku x Rp. - Rp. -
0.1000 Tukang Kayu x Rp. - Rp. -
0.0100 Kepala Tukang x Rp. - Rp. -
0.1000 Pekerja x Rp. - Rp. -
0.0050 Mandor x Rp. - Rp. -
Jumlah Rp. -

- hal. 17 -
SNI 3434:2008
Memasang 1 m2 rangka rangka atap gentengbeton, kayu klas II
0.0140 M3 Kaso-kaso (5x7) cm x Rp. - Rp. -
0.0072 M3 Reng (2x3) cm x Rp. - Rp. -
0.2500 Kg Paku x Rp. - Rp. -
0.1000 Tukang Kayu x Rp. - Rp. -
0.0100 Kepala Tukang x Rp. - Rp. -
0.1000 Pekerja x Rp. - Rp. -
0.0050 Mandor x Rp. - Rp. -
Jumlah Rp. -

SNI 3434:2008
Memasang 1 m2 rangka rangka atap sirap, kayu klas II
0.1650 M3 Kayu klas II x Rp. - Rp. -
0.2000 Kg Paku 5 ~ 10 CM x Rp. - Rp. -
0.1200 Tukang Kayu x Rp. - Rp. -
0.0120 Kepala Tukang x Rp. - Rp. -
0.1200 Pekerja x Rp. - Rp. -
0.0060 Mandor x Rp. - Rp. -
Jumlah Rp. -

1 m2 Pek. Kaca Mati 5 mm


1.0000 M2 Kaca Mati x Rp. - Rp. -
0.0300 Kg Paku x Rp. - Rp. -
4.0000 M Kayu Les x Rp. - Rp. -
0.5000 Tukang kayu x Rp. - Rp. -
0.0250 Kepala Tukang x Rp. - Rp. -
Jumlah Rp. -

1 m2 Residu
1.0000 Kg Cat Residu x Rp. - Rp. -
0.1000 Pekerja x Rp. - Rp. -
0.0050 Mandor x Rp. - Rp. -
Jumlah Rp. -

SNI 3434:2008
Memasang 1 m2 rangka dinding pemisah (60 x 120) cm kayu klas II
0.0280 M3 Balok Kayu x Rp. - Rp. -
0.1500 Kg Paku x Rp. - Rp. -
0.4500 Tukang Kayu x Rp. - Rp. -
0.0450 Kepala Tukang x Rp. - Rp. -
0.1500 Pekerja x Rp. - Rp. -
0.0080 Mandor x Rp. - Rp. -
Jumlah Rp. -

SNI 7393:2008
memasang 1 m2 jendela nako & trails
1.1000 M2 Kaca 5 mm+ rangka x Rp. - Rp. -
10.0000 Daun paku skrup x Rp. - Rp. -
7.0000 Besi strip x Rp. - -
0.2000 Tukang Kayu x Rp. - Rp. -
0.0200 Kepala Tukang x Rp. - Rp. -
0.2000 Pekerja x Rp. - Rp. -
0.0010 Mandor x Rp. - Rp. -
Jumlah Rp. -

SNI 3434:2008
Memasang 1 m2 dinding pemisah Plywood rangkap, rangka kayu klas II
0.0280 Lbr balok kayu (6x12)cm x Rp. - Rp. -
0.1500 kg Paku 5 cm dan 10 cm x Rp. - Rp. -
0.8600 lbr Teakwood tebal 4 mm (120x240) x Rp. - Rp. -
0.5600 Kg Lem Kayu x Rp. 20,000.00 Rp. 11,200.00
0.6000 Tukang Kayu x Rp. - Rp. -
0.0600 Kepala Tukang x Rp. - Rp. -
0.2000 Pekerja x Rp. - Rp. -
0.0100 Mandor x Rp. - Rp. -
Jumlah Rp. 11,200.00
- hal. 18 -
SNI 3434:2008
Memasang 1 m2 dinding lambriziring dari papan klas I
0.0070 Lbr Papan kayu x Rp. - Rp. -
0.1000 kg Paku 5 cm dan 10 cm x Rp. - Rp. -
0.1500 lbr Paku Skrup 10 cm x Rp. - Rp. -
1.8000 Tukang Kayu x Rp. - Rp. -
0.1800 Kepala Tukang x Rp. - Rp. -
0.6000 Pekerja x Rp. - Rp. -
0.0300 Mandor x Rp. - Rp. -
Jumlah Rp. -

SNI 2839:2008
Memasang 1 m2 langit-langit gypsum board ukuran (1200x2400x9) m
0.3640 Lbr Gypsum board x Rp. - Rp. -
0.1100 Kg Paku Skrup x Rp. - Rp. -
0.0500 Tukang Kayu x Rp. - Rp. -
0.0050 Kepala Tukang x Rp. - Rp. -
0.1000 Pekerja x Rp. - Rp. -
0.0050 Mandor x Rp. - Rp. -
Jumlah Rp. -

SNI 2839:2008
Memasang 1 m2 langit-langit lambriziring kayu , tebal 9 mm
0.0150 Lbr Kayu papan x Rp. - Rp. -
0.0100 Kg paku tripleks x Rp. - Rp. -
0.8000 Tukang Kayu x Rp. - Rp. -
0.0800 Kepala Tukang x Rp. - Rp. -
0.8000 Pekerja x Rp. - Rp. -
0.0400 Mandor x Rp. - Rp. -
Jumlah Rp. -

SNI 2839:2008
Memasang 1 m2 langit2 tripleks ukuran (120x240) cm , tebal 3 mm , 4 mm
0.3750 Lbr Tripleks 3 mm x Rp. - Rp. -
0.0300 Kg Paku tripleks x Rp. - Rp. -
0.1000 Tukang Kayu x Rp. - Rp. -
0.0100 Kepala Tukang x Rp. - Rp. -
0.1000 Pekerja x Rp. - Rp. -
0.0050 Mandor x Rp. - Rp. -
Jumlah Rp. -

1 m2 Pek. Jendela Bingkai Kaca


0.0114 M3 Papan Bayam Kls I x Rp. - Rp. -
0.7569 M2 Kaca Polos 5 mm x Rp. - Rp. -
6.0000 Tukang Kayu x Rp. - Rp. -
0.6000 Kepala Tukang x Rp. - Rp. -
2.0000 Pekerja x Rp. - Rp. -
0.1000 Mandor x Rp. - Rp. -
Jumlah Rp. -

1 m3 Pek. Tiang Penyangga / Pemikul Kelas I


1.1000 M3 Kayu Bayam Kls I x Rp. - Rp. -
24.0000 Tukang Kayu x Rp. - Rp. -
2.4000 Kepala Tukang x Rp. - Rp. -
8.0000 Pekerja x Rp. - Rp. -
0.4000 Mandor x Rp. - Rp. -
Jumlah Rp. -

1 m3 Pek. Tiang Penyangga / Pemikul Kls II


1.1000 M3 Kayu Kls II Samarinda x Rp. - Rp. -
24.0000 Tukang Kayu x Rp. - Rp. -
2.4000 Kepala Tukang x Rp. - Rp. -
8.0000 Pekerja x Rp. - Rp. -
0.4000 Mandor x Rp. - Rp. -
Jumlah Rp. -

- hal. 19 -
1 m2 Cat Meni
0.3000 Kg Cat Meni x Rp. - Rp. -
0.0250 Pekerja x Rp. - Rp. -
0.0013 Mandor x Rp. - Rp. -
Jumlah Rp. -

1 m2 Pengecatan Atap Dengan Cat Mengkilap


0.1500 Kg Cat Mengkilap x Rp. - Rp. -
0.0750 Tukang Cat x Rp. - Rp. -
0.0500 Pekerja x Rp. - Rp. -
0.0025 Mandor x Rp. - Rp. -
Jumlah Rp. -

1 m2 Pengecatan Dengan Cat Mengkilap 3 x


0.3000 Kg Cat Mengkilap x Rp. - Rp. -
0.1500 Kg Cat Dasar x Rp. - Rp. -
0.1000 Kg Plamur x Rp. - Rp. -
0.0750 Ltr Minyak Cat x Rp. - Rp. -
0.1000 Lbr Kertas Gosok x Rp. - Rp. -
0.0750 Tukang Cat x Rp. - Rp. -
0.0075 Kepala Tukang x Rp. - Rp. -
0.0500 Pekerja x Rp. - Rp. -
0.0025 Mandor x Rp. - Rp. -
Jumlah Rp. -

1 m2 Pengecatan Plafon Eternit


0.3000 Kg Cat Tembok x Rp. - Rp. -
0.0750 Tukang Cat x Rp. - Rp. -
0.0075 Kepala Tukang x Rp. - Rp. -
0.0500 Pekerja x Rp. - Rp. -
0.0025 Mandor x Rp. - Rp. -
Jumlah Rp. -

1 m2 Pengecatan Dinding Tembok


0.3000 Kg Cat Tembok x Rp. - Rp. -
0.1000 Kg Plamur x Rp. - Rp. -
0.1000 Lbr Kertas Gosok x Rp. - Rp. -
0.0750 Tukang Cat x Rp. - Rp. -
0.0075 Kepala Tukang x Rp. - Rp. -
0.0500 Pekerja x Rp. - Rp. -
0.0025 Mandor x Rp. - Rp. -
Jumlah Rp. -

1 m2 Pek. Pengapuran Dinding Tembok 3 x


0.0011 M3 Kapur x Rp. - Rp. -
0.0100 Tukang Cat x Rp. - Rp. -
0.0150 Kepala Tukang x Rp. - Rp. -
0.0660 Pekerja x Rp. - Rp. -
Jumlah Rp. -

1 m2 Bekesting Biasa Untuk Accessoris


0.5000 Tukang Kayu x Rp. - Rp. -
0.0500 Kepala Tukang x Rp. - Rp. -
0.4000 Pekerja x Rp. - Rp. -
0.0100 Mandor x Rp. - Rp. -
0.4000 Kg Paku 5 cm x Rp. 0.00 Rp. -
0.0400 m3 Kayu Klas III x Rp. 0.00 Rp. -
Jumlah Rp. -

- hal. 20 -
1 buah mesin gilas Per Bulan
30.0000 Masinis x Rp. - Rp. -
30.0000 Penjaga Malam x Rp. - Rp. -
500.0000 ltr Solar x Rp. - Rp. -
20.0000 ltr Oli x Rp. - Rp. -
5.0000 ltr Gemuk (Greese) x Rp. - Rp. -
30.0000 Pekerja x Rp. - Rp. -
30.0000 Sewa Mesin Gilas x Rp. - Rp. -
Jumlah Rp. -

Pek. Pemadatan Tanah / Pasir (300 m2) dengan tebal perlapis 30 cm


1.0000 Kg Pekerja x Rp. - Rp. -
0.00013 Sewa Walss x Rp. - Rp. -
10.0000 ls Bahan Bakar + Pelumas x Rp. - Rp. -
1.0000 Operator x Rp. - Rp. -
Jumlah 300 m2 Rp. -
Jumlah 1 m2 Rp. -
PEMBONGKARAN JALAN

1 m2 Pembongkaran Jalan Aspal


0.2500 Pekerja x Rp. - Rp. -
0.0250 Mandor x Rp. - Rp. -
1.0000 ls Alat Bantu x Rp. 1,250.00 Rp. 1,250.00
Jumlah Rp. 1,250.00

1 m3 Pek.Membuang Tanah Galian


0.2000 Pekerja x Rp. - Rp. -
0.0800 Mandor x Rp. - Rp. -
Jumlah Rp. -

100 m2 Pembasahan Trace


1.0000 ls Pompa Air x Rp. - Rp. -
1.0000 ls Bahan Bakar x Rp. - Rp. -
1.0000 Kepala Tukang x Rp. - Rp. -
Jumlah Rp. -

1 m3 Lapisan Batu Kali


1.1000 m3 Batu Kali x Rp. - Rp. -
1.0500 Pekerja x Rp. - Rp. -
0.1500 Mandor x Rp. - Rp. -
2.0000 m2 Pemadatan x Rp. - Rp. -
Jumlah Rp. -

1 m3 Lapisan Batu Pecah 5/7 cm (T.7cm)


0.0800 M3 Batu Pecah 5/7 cm x Rp. - Rp. -
0.0100 Pekerja x Rp. - Rp. -
0.1500 Mandor x Rp. - Rp. -
1.5000 m2 Pemadatan x Rp. - Rp. -
Jumlah Rp. -

1 m2 Lapisan Aspal 2,5 Kg/m2


2.5000 kg Aspal x Rp. - Rp. -
0.0100 Mandor x Rp. - Rp. -
0.1000 Pekerja x Rp. - Rp. -
0.0500 Tukang Aspal x Rp. - Rp. -
1.0000 m3 Kayu Bakar x Rp. - Rp. -
Jumlah Rp. -

100 m2 Pengaspalan (Sirtu T.5 cm)


260.0000 Kg Aspal x Rp. - Rp. -
5.0000 m3 Sirtu x Rp. - Rp. -
0.1500 m3 Kayu Bakar x Rp. - Rp. -
5.0000 Pekerja x Rp. - Rp. -
1.0000 Tukang Aspal x Rp. 0.00 Rp. -
0.5000 Mandor x Rp. 0.00 Rp. -
0.00013 Biaya sewa walls x Rp. 0.00 Rp. -
0.00013 ls Biaya Penunjang x Rp. 50,000.00 Rp. 6.50
Jumlah Rp. 6.50
jumlah 1 m2 Rp. 0.07

- hal. 21 -
1 m2 Perbaikan Jalan Kembali
0.1800 m3 Lapis Lime Stone/batu kali x Rp. - Rp. -
1.0000 m2 Lapisan Batu Pecah 5/7 cm (T.7 x Rp. - Rp. -
1.0000 m2 Lapisan Aspal 2,5 kg x Rp. - Rp. -
1.0000 m2 Pengaspalan Sirtu (Sirtu T.5cm) x Rp. 0.07 Rp. 0.07
Jumlah Rp. 0.07

PEKERJAAN PENURUNAN DAN PENYETELAN PIPA (6 Meter)

Pipa Ø200 mm dan Ø150 mm


0.0680 Mandor x Rp. - Rp. -
0.3000 Tukang Pipa x Rp. - Rp. -
0.6800 Pekerja x Rp. - Rp. -
1.0000 ls Peralatan dll x Rp. - Rp. -
Jumlah Rp. -

Pipa Ø100 mm dan Ø75 mm


0.0600 Mandor x Rp. - Rp. -
0.2500 Tukang Pipa x Rp. - Rp. -
0.5800 Pekerja x Rp. - Rp. -
1.0000 ls Peralatan dll x Rp. - Rp. -
Jumlah Rp. -

Pipa Ø75 mm dan Ø50 mm


0.0520 Mandor x Rp. - Rp. -
0.2500 Tukang Pipa x Rp. - Rp. -
0.4800 Pekerja x Rp. - Rp. -
1.0000 ls Peralatan dll x Rp. - Rp. -
Jumlah Rp. -

PEKERJAAN PEMASANGAN PIPA

Pemasangan Pipa GIP Ø 100 mm


0.0600 Mandor x Rp. - Rp. -
0.2500 Tukang Pipa x Rp. - Rp. -
0.5800 Pekerja x Rp. - Rp. -
0.0450 m3 Galian Tanah x Rp. - Rp. -
0.4200 m3 Pekerjaan Beton rabat 1:2:3 x Rp. 20,000.00 Rp. 8,400.00
1.0000 ls Alat Bantu x Rp. - Rp. -
Jumlah 6 m' Rp. 8,400.00
Jumlah 1 m' Rp. 1,400.00

Pemasangan Pipa GIP Ø 75 mm


0.0560 Mandor x Rp. - Rp. -
0.2250 Tukang Pipa x Rp. - Rp. -
0.5300 Pekerja x Rp. - Rp. -
0.0300 m3 Galian Tanah x Rp. - Rp. -
0.3250 m3 Pekerjaan Beton rabat 1:2:3 x Rp. 20,000.00 Rp. 6,500.00
1.0000 ls Alat Bantu x Rp. - Rp. -
Jumlah 6 m' Rp. 6,500.00
Jumlah 1 m' Rp. 1,083.33

Pemasangan Pipa GIP Ø 75 mm


0.0560 Mandor x Rp. - Rp. -
0.2250 Tukang Pipa x Rp. - Rp. -
0.5300 Pekerja x Rp. - Rp. -
0.0300 m3 Galian Tanah x Rp. - Rp. -
0.3250 m3 Pekerjaan Beton rabat 1:2:3 x Rp. 20,000.00 Rp. 6,500.00
1.0000 ls Alat Bantu x Rp. - Rp. -
Jumlah 6 m' Rp. 6,500.00
Jumlah 1 m' Rp. 1,083.33

Pemasangan Pipa GIP Ø 50 mm


0.0520 Mandor x Rp. - Rp. -
0.2000 Tukang Pipa x Rp. - Rp. -
0.4800 Pekerja x Rp. - Rp. -
0.0150 m3 Galian Tanah x Rp. - Rp. -
0.2300 m3 Pekerjaan Beton rabat 1:2:3 x Rp. 20,000.00 Rp. 4,600.00
1.0000 ls Alat Bantu x Rp. - Rp. -
Jumlah 6 m' Rp. 4,600.00
Jumlah 1 m' Rp. 766.67

- hal. 22 -
Pemasangan Pipa PVC Ø100 mm
3.2000 m3 Galian Tanah x Rp. - Rp. -
1.2000 m3 Urugan Tanah dan Pemadatan x Rp. - Rp. -
1.0000 btg Penurunan dan Penyetelan Pipa x Rp. - Rp. -
1.1530 m3 Pembuangan sisa Tanah x Rp. - Rp. -
Jumlah 6 m' Rp. -
Jumlah 1 m' Rp. -

Pemasangan Pipa PVC Ø75 mm


2.9000 m3 Galian Tanah x Rp. - Rp. -
1.0000 m3 Urugan Tanah dan Pemadatan x Rp. - Rp. -
1.0000 btg Penurunan dan Penyetelan Pipa x Rp. - Rp. -
1.0280 m3 Pembuangan sisa Tanah x Rp. - Rp. -
Jumlah 6 m' Rp. -
Jumlah 1 m' Rp. -

Pemasangan Pipa PVC Ø50 mm


2.3000 m3 Galian Tanah x Rp. - Rp. -
0.6500 m3 Urugan Tanah dan Pemadatan x Rp. - Rp. -
1.0000 btg Penurunan dan Penyetelan Pipa x Rp. - Rp. -
0.7300 m3 Pembuangan sisa Tanah x Rp. - Rp. -
Jumlah 6 m' Rp. -
Jumlah 1 m' Rp. -

GALIAN TANAH CROSSING

Pipa PVC Ø 100 mm 6 meter


4.0000 m' Pembongkaran Jalan x Rp. 1,250.00 Rp. 5,000.00
2.4000 m3 Galian tanah Keras x Rp. - Rp. -
4.0000 m' Pembasahan Trase x Rp. - Rp. -
0.8000 m3 Beton 1:3:5 x Rp. 20,000.00 Rp. 16,000.00
1.5400 m3 Urugan Tanah Bekas Galian x Rp. - Rp. -
4.0000 m' Perbaikan Jalan Kembali x Rp. 0.07 Rp. 0.26
1.0000 btg Penurunan dan Penyetelan Pipa x Rp. - Rp. -
0.8600 m3 Buangan Tanah x Rp. - Rp. -
Jumlah 6 m' Rp. 21,000.26
Jumlah 1 m' Rp. 3,500.04

Pipa PVC Ø 75 mm 6 meter


4.0000 m' Pembongkaran Jalan x Rp. 1,250.00 Rp. 5,000.00
2.3600 m3 Galian tanah Keras x Rp. - Rp. -
4.0000 m' Pembasahan Trase x Rp. - Rp. -
0.8000 m3 Beton 1:3:5 x Rp. 20,000.00 Rp. 16,000.00
1.4930 m3 Urugan Tanah Bekas Galian x Rp. - Rp. -
4.0000 m' Perbaikan Jalan Kembali x Rp. 0.07 Rp. 0.26
1.0000 btg Penurunan dan Penyetelan Pipa x Rp. - Rp. -
0.8680 m3 Buangan Tanah x Rp. - Rp. -
Jumlah 6 m' Rp. 21,000.26
Jumlah 1 m' Rp. 3,500.04

Pipa PVC Ø 50 mm 6 meter


4.0000 m' Pembongkaran Jalan x Rp. 1,250.00 Rp. 5,000.00
2.1440 m3 Galian tanah Keras x Rp. - Rp. -
4.0000 m' Pembasahan Trase x Rp. - Rp. -
0.8000 m3 Beton 1:3:5 x Rp. 20,000.00 Rp. 16,000.00
1.3140 m3 Urugan Tanah Bekas Galian x Rp. - Rp. -
4.0000 m' Perbaikan Jalan Kembali x Rp. 0.07 Rp. 0.26
1.0000 btg Penurunan dan Penyetelan Pipa x Rp. - Rp. -
0.8300 m3 Buangan Tanah x Rp. - Rp. -
Jumlah 6 m' Rp. 21,000.26
Jumlah 1 m' Rp. 3,500.04

- hal. 23 -
PEMASANGAN TEE / DOP

Pada Pipa PVC Ø 100 mm dan < 100 mm


1.0000 bh Penyetelan x Rp. - Rp. -
0.0560 m3 Beton 1:3:5 x Rp. 20,000.00 Rp. 1,120.00
0.0900 m2 Bekesting x Rp. - Rp. -
Jumlah Rp. 1,120.00

Pada Pipa PVC Ø 200 mm dan < 150 mm


1.0000 bh Penyetelan x Rp. - Rp. -
0.1000 m3 Beton 1:3:5 x Rp. 20,000.00 Rp. 2,000.00
0.1200 m2 Bekesting x Rp. - Rp. -
Jumlah Rp. 2,000.00

PEMASANGAN FLANGE SPIGOT / SOCKET & VALVE COVER

Pada Pipa 4" - 2 "


0.1000 Mandor x Rp. - Rp. -
0.2500 Tukang Pipa x Rp. - Rp. -
0.3000 Pekerja x Rp. - Rp. -
1.0000 ls Alat bantu dan lain-lain x Rp. 1,250.00 Rp. 1,250.00
Jumlah Rp. 1,250.00

Pada Pipa 6" - 8 "


0.1200 Mandor x Rp. - Rp. -
0.3000 Tukang Pipa x Rp. - Rp. -
0.5000 Pekerja x Rp. - Rp. -
1.0000 ls Alat bantu dan lain-lain x Rp. 1,250.00 Rp. 1,250.00
Jumlah Rp. 1,250.00

PEMASANGAN GATE VALVE, CHEK VALVE,WATER METER DAN SEJENISNYA

Pada Pipa PVC Ø 100 mm - 50 mm


1.2150 m3 Galian Tanah x Rp. - Rp. -
0.0350 m3 Blok Beton K-125 x Rp. 20,000.00 Rp. 700.00
0.0270 m3 Blok Penahan K-125 x Rp. 20,000.00 Rp. 540.00
0.0800 m2 Bekesting Box x Rp. - Rp. -
0.7120 m3 Urugan Tanah x Rp. - Rp. -
1.0000 bh Penyambungan Gate Valve x Rp. 1,250.00 Rp. 1,250.00
1.0000 bh Penempatan Street Cover Rp. 2,500.00 Rp. 2,500.00
0.0060 m3 Urugan Pasir x Rp. - Rp. -
0.5030 m3 Buangan Tanah x Rp. - Rp. -
Jumlah Rp. 4,990.00
PEMASANGAN BEND 900

Pada Pipa PVC Ø 100 mmdan < 100 mm


1.0000 Penyetelan x Rp. - Rp. -
0.0560 m3 Beton 1 : 3 : 5 x Rp. 20,000.00 Rp. 1,120.00
0.1500 m2 Bekesting x Rp. - Rp. -
Jumlah Rp. 1,120.00

PEKERJAAN PENGELASAN
1 m' Penyambungan Flange Las
2.0000 kg Kawat Las x Rp. - Rp. -
0.7500 Tukang Las x Rp. - Rp. -
0.0800 Kepala Tukang x Rp. - Rp. -
1.0000 Pekerja x Rp. - Rp. -
1.0000 ls Alat Bantu dll x Rp. 1,250.00 Rp. 1,250.00
Jumlah Rp. 1,250.00

PENYETELAN / PEMASANGAN FLANGE LAS , BEND STEEL , ALL FLANGE dan Sejenisnya

Pemasangan Flange Las Dia. 4" dan < DN 4'


0.1000 Tukang Pipa x Rp. - Rp. -
0.2000 Pekerja x Rp. - Rp. -
0.0800 Kepala Tukang x Rp. - Rp. -
0.6280 m' Penyambungan Flange x Rp. 1,250.00 Rp. 785.00
Jumlah Rp. 785.00

- hal. 24 -
Pemasangan Tee / Dop , Clem Sadel Dia. 4" dan DN < 4"
0.0900 m2 Bekesting x Rp. - Rp. -
0.0560 m3 Beton 1:3:5 x Rp. 20,000.00 Rp. 1,120.00
1.0000 m' Penyetelan pipa dia 100 mm x Rp. - Rp. -
Jumlah Rp. 1,120.00

Pemasangan Reduser /Double Neple & TS Valve Dia. 4" dan DN < 4"
0.1600 m2 Bekesting x Rp. - Rp. -
0.0770 m3 Beton 1:3:5 x Rp. 20,000.00 Rp. 1,540.00
1.0000 m' Penyetelan pipa dia 100 mm x Rp. - Rp. -
Jumlah Rp. 1,540.00

Pemasangan Bend /Ts Elbow der.90 Dia. 4" dan DN < 4"
0.1500 m2 Bekesting x Rp. - Rp. -
0.0560 m3 Beton 1:3:5 x Rp. 20,000.00 Rp. 1,120.00
1.0000 m' Penyetelan pipa dia 100 mm x Rp. - Rp. -
Jumlah Rp. 1,120.00

Pemasangan Bend /Ts Elbow der.45 / 22 / 11,25 Dia. 4" dan DN < 4"
0.1500 m2 Bekesting x Rp. - Rp. -
0.0320 m3 Beton 1:3:5 x Rp. 20,000.00 Rp. 640.00
1.0000 m' Penyetelan pipa dia 100 mm x Rp. - Rp. -
Jumlah Rp. 640.00

Pemasangan Air Valve / Pentil Udara Dia. 2"


0.2500 m Pipa Gip Ø 2" x Rp. - Rp. -
1.0000 bh Flange Steel Ø 2" x Rp. - Rp. -
2.0000 bh Karet Packing Ø 2 " x Rp. - Rp. -
6.0000 biji Baut x Rp. - Rp. -
0.0520 Mandor x Rp. - Rp. -
0.2000 Tukang Pipa x Rp. - Rp. -
0.4800 Pekerja Rp. - Rp. -
1.0000 ls Alat Bantu dan lain-lain x Rp. 1,250.00 Rp. 1,250.00
Jumlah Rp. 1,250.00

Pemasangan Air Valve / Pentil Udara Dia. 3"


0.2500 m Pipa Gip Ø 3" x Rp. - Rp. -
1.0000 bh Flange Steel Ø 3" x Rp. - Rp. -
2.0000 bh Karet Packing Ø 3 " x Rp. - Rp. -
6.0000 biji Baut x Rp. - Rp. -
0.0520 Mandor x Rp. - Rp. -
0.2000 Tukang Pipa x Rp. - Rp. -
0.4800 Pekerja Rp. - Rp. -
1.0000 ls Alat Bantu dan lain-lain x Rp. 1,250.00 Rp. 1,250.00
Jumlah Rp. 1,250.00

0
KEPALA DINAS PEKERJAAN UMUM
KABUPATEN GOWA

( Ir.H.MUH. AMIN YAKUB,MSi. )


0

- hal. 25 -
RENCANA PEMBELIAN LANGSUNG (Survey Perbandingan Harga)

Kabupaten : Wajo Nama KKM


Kecamatan : Pitumpanua Jenis Kegiatan
Desa : Alelebbae
Harga Satuan
NO. PAKET PEKERJAAN URAIAN Volume Satuan Jumlah Biaya (Rp.) Speksifikasi
(Rp.)

1 Paket Material 1 - Semen Portland 237.00 Zak 60,000 14,220,000 Semen Portland 50 kg
(Bahan/Material Toko) - Besi Ø 16 mm - Batang 160,000 - SNI 12 M Polos
- Besi Ø 14 mm 90.00 Batang 125,000 11,250,000 SNI 12 M Polos
- Besi Ø 12 mm 65.00 Batang 87,000 5,655,000 SNI 12 M Polos
- Besi Ø 10 mm 50.00 Batang 59,000 2,950,000 SNI 12 M Polos
- Besi Ø 8 mm 59.00 Batang 38,000 2,242,000 SNI 12 M Polos
- Besi Ø 6 mm 6.00 Batang 25,000 150,000 SNI 12 M Polos
- Kawat Beton 40.00 Kg 20,000 800,000
- Paku Biasa 31.00 Kg 15,000 465,000
- Cat Tembok 100.00 Kg 65,000 6,500,000 Anti Lumut
- Cat Besi 7.00 Kg 57,000 399,000
- Cat Meni Besi 3.00 Kg 45,000 135,000
- Kunci Tanam 1.00 Bh 125,000 125,000
- Engsel Kupu-Kupu 3.00 Bh 15,000 45,000
- Plamur 28.00 Kg 5,000 140,000
- Tripleks 9 mm 24.00 Lbr 98,000 2,352,000
- Gerobak Dorong 1.00 Bh 470,000 470,000
- Sekop 4.00 Bh 50,000 200,000
- Gergaji Besi 1.00 Bh 50,000 50,000
- Mata Gergaji 5.00 Bh 10,000 50,000
- Ember Cor 24.00 Bh 10,000 240,000
- Kuas Cat Besar 4.00 Bh 12,000 48,000
- Kuas Cat Kecil 3.00 Bh 4,000 12,000
- Terpal/Tenda Kerja 1.00 Bh 250,000 250,000

Jumlah 1.) 48,748,000


Harga Satuan
NO. PAKET PEKERJAAN URAIAN Volume Satuan Jumlah Biaya (Rp.) Speksifikasi
(Rp.)

2 Paket Material 2 - Pasir Urug/Tanah Timbunan 3.000 m³ 112,500 337,500


(Bahan/Material Leveransir) - Pasir Pasangan 10.00 m³ 112,500 1,125,000
- Pasir Beton 12.00 m³ 125,000 1,500,000
- Batu Pecah 2/3 17.00 m³ 289,000 4,913,000
- Batu Belah 3.00 m³ 162,500 487,500
- Bata merah 5 x 11 x 22 cm 1,553.00 Bh 600 931,800

Jumlah 2.) 9,294,800

3 Paket Material Lokal - Balok Kayu 5/7 (Kayu Perancah/Mal) 82.00 Btg 42,000 3,444,000
(Bahan/Material Kayu) - Papan Kayu 2/25 (Kayu Perancah/Mal) 13.00 Lbr 60,000 780,000
- Kusen Pintu 1.00 Bh 400,000 400,000
- Daun Pintu 1.00 Bh 700,000 700,000
- Kusen Jendela - Bh 200,000 -
- Bambu 86.00 Btg 25,000 2,150,000

Jumlah 3.) 7,474,000

4 Paket Upah - Pekerja 253.87 Hok 86,000 21,832,820 Survey Perbandingan Harga
- Tukang 93.00 Hok 101,000 9,393,000
Jumlah 4.) 31,225,820

5 Paket Perpipaan PIPA GIP MEDIUM A Super (6 m/Btg)


- Pipa GIP Ø 3" 2.00 Batang 1,187,000.00 2,374,000
- Pipa GIP Ø 2" 2.00 Batang 720,000.00 1,440,000
- Pipa GIP Ø 1 1/2" 2.00 Batang 527,000.00 1,054,000

PIPA PVC SNI S.10 - S.12,5


- Pipa PVC Ø 3" (6 m) 25.00 Batang 255,000.00 6,375,000
- Pipa PVC Ø 2" (6 m) 114.00 Batang 120,000.00 13,680,000
- Pipa PVC Ø 1 ½" (6 m) 51.00 Batang 88,000.00 4,488,000

Assesoris Pipa GIP


- Socket GIP Ø 3" 1.00 Buah 73,000.00 73,000
- Socket GIP Ø 2" 1.00 Buah 26,000.00 26,000
- Socket GIP Ø 1 1/2" 1.00 Buah 17,000.00 17,000
- Knee 90⁰ GIP Ø 3" 2.00 Buah 104,800.00 209,600
- Knee 90⁰ GIP Ø 2" 4.00 Buah 36,000.00 144,000
- Knee 90⁰ GIP Ø 1 1/2" 3.00 Buah 23,000.00 69,000
- Knee/Bend 45⁰ GIP Ø 1 1/2" 2.00 Buah 26,000.00 52,000
- Gate Valve GIP Ø 3'' - Buah 861,000.00 -
- Gate Valve GIP Ø 2'' 1.00 Buah 315,000.00 315,000
- Gate Valve GIP Ø 1 1/2'' 1.00 Buah 216,000.00 216,000
- Check Valve GIP Ø 1 1/2'' 1.00 Buah 256,000.00 256,000
- Double Nepple GIP Ø 2'' - Buah 31,500.00 -
- Double Nepple GIP Ø 1 1/2'' - Buah 16,000.00 -
- Watermur/Union GIP Ø 1 1/2'' 1.00 Buah 46,000.00 46,000
- Presure meter 1 1/2" 1.00 Buah 150,000.00 150,000 Pemilihan Langsung
- Seal Tape 10.00 Buah 5,000.00 50,000
- Sney Pipa Ø 3" - 4" 1.00 Buah 1,600,000.00 1,600,000
- Kunci Pipa Gip . 3" - 4" 2.00 Buah 387,000.00 774,000
Pemilihan Langsung

Harga Satuan
NO. PAKET PEKERJAAN URAIAN Volume Satuan Jumlah Biaya (Rp.) Speksifikasi
(Rp.)
Assesoris Pipa PVC SNI
- Sock Drat Luar PVC Ø 3" 1.00 Buah 85,000.00 85,000
- Sock Drat Luar PVC Ø 2" 1.00 Buah 38,000.00 38,000
- Sock Drat Luar PVC Ø 1 1/2" 3.00 Buah 15,000.00 45,000
- Sock Drat Dalam PVC Ø 3" - Buah 85,000.00 -
- Sock Drat Dalam PVC Ø 2" - Buah 38,000.00 -
- Sock Drat Dalam PVC Ø 1 1/2" - Buah 15,000.00 -
- Reducer PVC Ø 3" x Ø 2" 1.00 Buah 40,000.00 40,000
- Reducer PVC Ø 2" x Ø 1 1/2" 2.00 Buah 30,000.00 60,000
- Tee PVC Ø 3" x 3" x 3" 1.00 Buah 100,000.00 100,000
- Tee PVC Ø 2" x 3" x 2" 1.00 Buah 140,000.00 140,000
- Tee PVC Ø 2" x 2" x 2" 6.00 Buah 50,000.00 300,000
- Gate Valve 3" 2.00 Buah 300,000.00 600,000
- Dop PVC Ø 2" 4.00 Buah 25,000.00 100,000
- Dop PVC Ø 1 1/2" 2.00 Buah 12,000.00 24,000
- Knee 90 PVC Ø 3" 2.00 Buah 104,000.00 208,000
- Knee 90 PVC Ø 2" 2.00 Buah 32,000.00 64,000
- Knee 90 PVC Ø 1 1/2" 1.00 Buah 17,500.00 17,500
- Lem Pipa (Solvent Cement PVC) @ 400 gr 10.00 Buah 50,000.00 500,000
- Meteran Air 1.00 Buah 140,000.00 140,000
- Biaya Mobilisasi Pipa dan Aksesoris 1.00 Paket 1,885,000.00 1,885,000

Jumlah 5.) 37,755,100

6 Paket Pengelasan - Penutup Man Hole 80 x 80 (Besi Plat) 1.00 Ls 900,000 900,000 Pemilihan Langsung
- Penutup Box Valve 60 x 60 (Besi Plat) 1.00 Ls 750,000 750,000
- Tangga Pipa GIP Ø 1/2" 1.00 Ls 2,000,000 2,000,000
- Pipa Vent Gip Ø 2" 1.00 Ls 250,000 250,000

Jumlah 6.) 3,900,000


7 Paket PLN 3,5 KW - Jasa Pemasangan Baru PLN Daya 3,5 KVA 1.00 Paket 7,036,500 7,036,500 Pemilihan Langsung

Jumlah 7.) 7,036,500

8 Paket Pengadaan Pompa Submersible Pump (SP) 1.00 Paket 45,000,000 45,000,000 Pemilihan Langsung

Jumlah 9.) 45,000,000


Paket Pengeboran - Jasa Geolistrik 1.00 Paket 3,000,000 3,000,000
9 Pemilihan Langsung
Air Tanah Dalam - Jasa Pengeboran Sumur Tanah Dalam 1.00 Paket 36,275,000 39,200,000

Jumlah 9.) 42,200,000

Tosora, 201

Menyetujui, Mengetahui, Dibuat oleh Tim Pengadaa


Koordinator Kabupaten Fasilitator Teknik Koodinator KKM Masagena Ketua
\

( ARADEA YUSUF, ST ) ( ANDI IMAN ROSADI, ST ) ( PADUWAI ) ( SIRAJUDDIN )


ANGSUNG (Survey Perbandingan Harga)

: Alelebbae
: Sarana Air Minum dan Sanitasi

Waktu Pengadaan
Waktu Pengadaan

0
Waktu Pengadaan

Tosora, 2019

Dibuat oleh Tim Pengadaan


Ketua

( SIRAJUDDIN )
ANALISA HARGA SATUAN PEKERJAAN (AHSP)
BIDANG CIPTA KARYA

PERMEN NO. 11/PRT/M/2013


HARGA SATUAN PEKERJAAN PERSIAPAN

Pengkuran dan pemasangan 1 m' Bouwplank


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 100,000 10,000
Tukang Kayu L.02 OH 0.100 120,000 12,000
Kepala Tukang L.03 OH 0.010 - -
Mandor L.04 OH 0.005 - -
JUMLAH TENAGA KERJA 22,000
B BAHAN
Kayu balok 5/5 m3 0.120 2,800,000 336,000
Paku biasa 2' - 3' Kg 0.020 22,000 440
Kayu papan 3/20 m3 0.007 45,000 315
JUMLAH HARGA BAHAN 336,755
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 358,755

Pembersihan 1 m2 lapangan dan perataan


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 100,000 10,000
Mandor L.04 OH 0.050 - -
JUMLAH TENAGA KERJA 10,000
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 10,000

PERMEN NO. 11/PRT/M/2013


HARGA SATUAN PEKERJAAN TANAH

Penggalian 1 m3 tanah biasa sedalam 1 m'


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.750 100,000 75,000
Mandor L.04 OH 0.025 - -
JUMLAH TENAGA KERJA 75,000
B BAHAN -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 75,000


Penggalian 1 m3 tanah biasa sedalam 2 m'
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.900 100,000 90,000
Mandor L.04 OH 0.045 - -
JUMLAH TENAGA KERJA 90,000
B BAHAN -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 90,000

Penggalian 1 m3 tanah biasa sedalam 3 m'


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.050 100,000 105,000
Mandor L.04 OH 0.067 - -
JUMLAH TENAGA KERJA 105,000
B BAHAN -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 105,000

Penggalian 1 m3 tanah keras sedalam 1 m'


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.000 100,000 100,000
Mandor L.04 OH 0.032 - -
JUMLAH TENAGA KERJA 100,000
B BAHAN -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 100,000

Penggalian stripping 1 m2 tanah tebing setinggi 1 m'


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.050 100,000 5,000
Mandor L.04 OH 0.005 - -
JUMLAH TENAGA KERJA 5,000
B BAHAN -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 5,000


Pembuangan 1 m3 tanah sejauh 30 m'
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.330 100,000 33,000
Mandor L.04 OH 0.010 - -
JUMLAH TENAGA KERJA 33,000
B BAHAN -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 33,000

Pengurugan kembali 1 m3 galian tanah


Pengurugan kembali 1 m3 galian dihitung 1/3 kali dari koefisien pekerjaan galian

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.500 100,000 50,000
Mandor L.04 OH 0.050 - -
JUMLAH TENAGA KERJA 50,000
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 50,000

Pemadatan tanah 1 m3 tanah (per 20 cm )


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.500 100,000 50,000
Mandor L.04 OH 0.050 - -
JUMLAH TENAGA KERJA 50,000
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 50,000

Pengurugan 1 m3 dengan pasir urug


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 100,000 30,000
Mandor L.04 OH 0.010 - -
JUMLAH TENAGA KERJA 30,000
B BAHAN
Pasir urug m3 1.200 242,000 290,400
JUMLAH HARGA BAHAN 290,400
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 320,400
PERMEN NO. 11/PRT/M/2013
HARGA SATUAN PEKERJAAN PONDASI

Pemasangan 1 m3 pondasi batu belah campuran 1SP:3PP


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.500 100,000 150,000
Tukang batu L.02 OH 0.750 120,000 90,000
Kepala Tukang L.03 OH 0.075 -
Mandor L.04 OH 0.075 -
JUMLAH TENAGA KERJA 240,000
B BAHAN
Batu belah m3 1.200 395,000 474,000
Semen Porlant Kg 202.000 1,340 270,680
Pasir pasang m3 0.485 242,000 117,370
JUMLAH HARGA BAHAN 862,050
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,102,050

Pemasangan 1 m3 pondasi batu belah campuran 1SP:4PP


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.500 100,000 150,000
Tukang batu L.02 OH 0.750 120,000 90,000
Kepala Tukang L.03 OH 0.075 -
Mandor L.04 OH 0.075 -
JUMLAH TENAGA KERJA 240,000
B BAHAN
Batu belah m3 1.200 395,000 474,000
Semen Porlant Kg 163.000 1,340 218,420
Pasir pasang m3 0.520 242,000 125,840
JUMLAH HARGA BAHAN 818,260
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 1,058,260

Pemasangan 1 m3 pondasi batu kosong (anstamping)


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.780 100,000 78,000
Tukang batu L.02 OH 0.390 120,000 46,800
Kepala Tukang L.03 OH 0.039 -
Mandor L.04 OH 0.039 -
JUMLAH TENAGA KERJA 124,800
B BAHAN
Batu belah m3 1.200 395,000 474,000
Pasir urug m3 0.432 242,000 104,544
JUMLAH HARGA BAHAN 578,544
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 703,344

Pemasangan 1 m3 pondasi siklop, 60% beton campuran 1SP:2PB:3KR dan 40% batu belah
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 3.400 100,000 340,000
Tukang batu L.02 OH 0.850 120,000 102,000
Kepala Tukang L.03 OH 0.085 -
Mandor L.04 OH 0.170 -
JUMLAH TENAGA KERJA 442,000
B BAHAN
Batu belah m3 0.480 395,000 189,600
Semen portland Kg 194.000 1,340 259,960
Pasir beton m3 0.312 306,000 95,472
Kerikil m3 0.468 505,000 236,340
Besi beton Kg 126.000 15,823 1,993,671
Kawat beton Kg 1.800 23,000 41,400
JUMLAH HARGA BAHAN 2,816,443
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 3,258,443

Pemasangan 1 m3 pondasi sumuran diameter 100 cm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 2.400 100,000 240,000
Tukang batu L.02 OH 0.800 120,000 96,000
Kepala Tukang L.03 OH 0.080 -
Mandor L.04 OH 0.119 -
JUMLAH TENAGA KERJA 336,000
B BAHAN
Batu belah m3 0.450 395,000 177,750
Semen portland Kg 194.000 1,340 259,960
Pasir beton m3 0.312 306,000 95,472
Kerikil m3 0.468 505,000 236,340
JUMLAH HARGA BAHAN 769,522
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 1,105,522

PERMEN NO. 11/PRT/M/2013


HARGA SATUAN PEKERJAAN BETON

CATATAN
Bobot isi pasir + 1.400 kg/m3, Bobot isi kerikil = 1.350 kg/m3, Bucking factor pasir = 20 %

Membuat 1 m3 lantai kerja beton mutu f' = 7,4 Mpa (K 100), slump (3-6) cm, w/c = 0,87
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.200 100,000 120,000
Tukang batu L.02 OH 0.200 120,000 24,000
Kepala Tukang L.03 OH 0.020 -
Mandor L.04 OH 0.060 -
JUMLAH TENAGA KERJA 144,000
B BAHAN
Semen portland Kg 230.000 1,340 308,200
Pasir beton m3 0.638 306,000 195,184
Batu pecah 2-3 m3 0.761 591,000 449,598
Air Ltr 200 -
JUMLAH HARGA BAHAN 952,982
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 1,096,982

Membuat 1 m3 beton mutu f' = 14,5 Mpa (K 175), slump (12 ±2) cm, w/c = 0,65
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 100,000 165,000
Tukang batu L.02 OH 0.275 120,000 33,000
Kepala Tukang L.03 OH 0.028 -
Mandor L.04 OH 0.083 -
JUMLAH TENAGA KERJA 198,000
B BAHAN
Semen portland Kg 326.000 1,340 436,840
Pasir beton m3 0.543 306,000 166,114
Batu pecah 2-3 m3 0.762 591,000 450,473
Air Ltr 215 -
JUMLAH HARGA BAHAN 1,053,428
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 1,251,428

Membuat 1 m3 beton mutu f' = 16,9 Mpa (K 200), slump (12 ±2) cm, w/c = 0,61
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 100,000 165,000
Tukang batu L.02 OH 0.275 120,000 33,000
Kepala Tukang L.03 OH 0.028 -
Mandor L.04 OH 0.083 -
JUMLAH TENAGA KERJA 198,000
B BAHAN
Semen portland Kg 352.000 1,340 471,680
Pasir beton m3 0.522 306,000 159,776
Batu pecah 2-3 m3 0.764 591,000 451,349
Air Ltr 215 -
JUMLAH HARGA BAHAN 1,082,805
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 1,280,805

Membuat 10 kg dengan besi polos atau besi ulir


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.070 100,000 7,000
Tukang besi L.02 OH 0.070 120,000 8,400
Kepala Tukang L.03 OH 0.007 -
Mandor L.04 OH 0.004 -
JUMLAH TENAGA KERJA 15,400
B BAHAN
Besi beton (polos/ulir) Kg 10.500 18,561 194,886
Kawat beton Kg 0.150 23,000 3,450
JUMLAH HARGA BAHAN 198,336
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 213,736


Membuat 1 kg dengan besi polos atau besi ulir 21,374

Membuat 1 kg dengan besi polos atau besi ulir


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.007 100,000 700
Tukang besi L.02 OH 0.007 120,000 840
Kepala Tukang L.03 OH 0.001 -
Mandor L.04 OH 0.000 -
JUMLAH TENAGA KERJA 1,540
B BAHAN
Besi beton (polos/ulir) Kg 1.050 18,561 19,489
Kawat beton Kg 0.015 23,000 345
JUMLAH HARGA BAHAN 19,834
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 21,374

Membuat 1 m2 bekisting untuk pondasi


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.520 100,000 52,000
Tukang Kayu L.02 OH 0.260 120,000 31,200
Kepala Tukang L.03 OH 0.026 -
Mandor L.04 OH 0.026 -
JUMLAH TENAGA KERJA 83,200
B BAHAN
Kayu kelas III m3 0.040 45,000 1,800
Paku 5 - 10 cm Kg 0.300 22,000 6,600
Minyak bekisting Ltr 0.100 -
JUMLAH HARGA BAHAN 8,400
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 91,600

Membuat 1 m2 bekisting untuk sloof


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.520 100,000 52,000
Tukang Kayu L.02 OH 0.260 120,000 31,200
Kepala Tukang L.03 OH 0.026 -
Mandor L.04 OH 0.026 -
JUMLAH TENAGA KERJA 83,200
B BAHAN
Kayu kelas III m3 0.045 45,000 2,025
Paku 5 - 10 cm Kg 0.300 22,000 6,600
Minyak bekisting Ltr 0.100 -
JUMLAH HARGA BAHAN 8,625
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 91,825

Membuat 1 m2 bekisting untuk kolom


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.660 100,000 66,000
Tukang Kayu L.02 OH 0.330 120,000 39,600
Kepala Tukang L.03 OH 0.033 -
Mandor L.04 OH 0.033 -
JUMLAH TENAGA KERJA 105,600
B BAHAN
Kayu kelas III m3 0.040 - -
Paku 5 - 10 cm Kg 0.400 22,000 8,800
Minyak bekisting Ltr 0.200 -
Balok kayu kelas III m3 0.015 45,000 675
Plywood tebal 9 mm Lbr 0.350 110,000 38,500
Dolken kayu φ 8-10cm/400 cm Batang 2.000 #NAME? #NAME?
JUMLAH HARGA BAHAN #NAME?
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) #NAME?

Membuat 1 m2 bekisting untuk balok


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.660 100,000 66,000
Tukang Kayu L.02 OH 0.330 120,000 39,600
Kepala Tukang L.03 OH 0.033 -
Mandor L.04 OH 0.033 -
JUMLAH TENAGA KERJA 105,600
B BAHAN
Kayu kelas III m3 0.040 - -
Paku 5 - 10 cm Kg 0.400 22,000 8,800
Minyak bekisting Ltr 0.200 -
Balok kayu kelas III m3 0.018 45,000 810
Plywood tebal 9 mm Lbr 0.350 110,000 38,500
Dolken kayu φ 8-10cm/400 cm Batang 2.000 #NAME? #NAME?
JUMLAH HARGA BAHAN #NAME?
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) #NAME?


Membuat 1 m2 bekisting untuk lantai
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.660 100,000 66,000
Tukang Kayu L.02 OH 0.330 120,000 39,600
Kepala Tukang L.03 OH 0.033 -
Mandor L.04 OH 0.033 -
JUMLAH TENAGA KERJA 105,600
B BAHAN
Kayu kelas III m3 0.040 - -
Paku 5 - 10 cm Kg 0.400 22,000 8,800
Minyak bekisting Ltr 0.200 -
Balok kayu kelas III m3 0.015 45,000 675
Plywood tebal 9 mm Lbr 0.350 110,000 38,500
Dolken kayu φ 8-10cm/400 cm Batang 6.000 #NAME? #NAME?
JUMLAH HARGA BAHAN #NAME?
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) #NAME?

Membuat 1 m2 bekisting untuk dinding


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.660 100,000 66,000
Tukang Kayu L.02 OH 0.330 120,000 39,600
Kepala Tukang L.03 OH 0.033 -
Mandor L.04 OH 0.033 -
JUMLAH TENAGA KERJA 105,600
B BAHAN
Kayu kelas III m3 0.030 - -
Paku 5 - 10 cm Kg 0.400 22,000 8,800
Minyak bekisting Ltr 0.200 - -
Balok kayu kelas III m3 0.020 45,000 900
Plywood tebal 9 mm Lbr 0.350 110,000 38,500
Dolken kayu φ 8-10cm/400 cm Batang 3.000 #NAME? #NAME?
Penjaga jarak bekisting/spacer Bh 4.000 - -
JUMLAH HARGA BAHAN #NAME?
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) #NAME?

Membuat 1 m2 bekisting untuk tangga


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.660 100,000 66,000
Tukang Kayu L.02 OH 0.330 120,000 39,600
Kepala Tukang L.03 OH 0.033 -
Mandor L.04 OH 0.033 -
JUMLAH TENAGA KERJA 105,600
B BAHAN
Kayu kelas III m3 0.030 - -
Paku 5 - 10 cm Kg 0.400 22,000 8,800
Minyak bekisting Ltr 0.150 -
Balok kayu kelas II m3 0.015 45,000 675
Plywood tebal 9 mm Lbr 0.350 110,000 38,500
Dolken kayu φ 8-10cm/400 cm Batang 2.000 #NAME? #NAME?
JUMLAH HARGA BAHAN #NAME?
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) #NAME?

PERMEN NO. 11/PRT/M/2013


HARGA SATUAN PEKERJAAN PASANGAN DINDING

Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1SP:2PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.300 100,000 30,000
Tukang batu L.02 OH 0.100 120,000 12,000
Kepala tukang L.03 OH 0.0100 -
Mandor L.04 OH 0.0150 -
JUMLAH TENAGA KERJA 42,000
B BAHAN
Bata merah bh 70.000 1,000 70,000
Semen portland kg 18.950 1,340 25,393
Pasir pasang m3 0.0380 242,000 9,196
JUMLAH HARGA BAHAN 104,589
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 146,589

Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1SP:3PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.300 100,000 30,000
Tukang batu L.02 OH 0.100 120,000 12,000
Kepala tukang L.03 OH 0.0100 -
Mandor L.04 OH 0.0150 -
JUMLAH TENAGA KERJA 42,000
B BAHAN
Bata merah bh 70.000 1,000 70,000
Semen portland kg 14.370 1,340 19,256
Pasir pasang m3 0.0400 242,000 9,680
JUMLAH HARGA BAHAN 98,936
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 140,936


Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1SP:4PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.300 100,000 30,000
Tukang batu L.02 OH 0.100 120,000 12,000
Kepala tukang L.03 OH 0.0100 -
Mandor L.04 OH 0.0150 -
JUMLAH TENAGA KERJA 42,000
B BAHAN
Bata merah bh 70.000 1,000 70,000
Semen portland kg 11.500 1,340 15,410
Pasir pasang m3 0.0430 242,000 10,406
JUMLAH HARGA BAHAN 95,816
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 137,816

PERMEN NO. 11/PRT/M/2013


HARGA SATUAN PEKERJAAN PLESTERAN

Pemasangan 1 m2 plesteran 1SP:3PP tebal 20mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.260 100,000 26,000
Tukang batu L.02 OH 0.200 120,000 24,000
Kepala tukang L.03 OH 0.0200 -
Mandor L.04 OH 0.0130 -
JUMLAH TENAGA KERJA 50,000
B BAHAN
Semen portland kg 10.368 1,340 13,893
Pasir pasang m3 0.031 242,000 7,502
JUMLAH HARGA BAHAN 21,395
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 71,395

Pemasangan 1 m2 plesteran 1SP:4PP tebal 20mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.400 100,000 40,000
Tukang batu L.02 OH 0.200 120,000 24,000
Kepala tukang L.03 OH 0.0200 -
Mandor L.04 OH 0.0220 -
JUMLAH TENAGA KERJA 64,000
B BAHAN
Semen portland kg 8.320 1,340 11,149
Pasir pasang m3 0.032 242,000 7,744
JUMLAH HARGA BAHAN 18,893
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 82,893

Pemasangan 1 m2 finishing siar pasangan batu kali, campuran 1SP:2PP


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.300 100,000 30,000
Tukang batu L.02 OH 0.150 120,000 18,000
Kepala tukang L.03 OH 0.0150 -
Mandor L.04 OH 0.0150 -
JUMLAH TENAGA KERJA 48,000
B BAHAN
Semen portland kg 6.320 1,340 8,469
Pasir pasang m3 0.012 242,000 2,904
JUMLAH HARGA BAHAN 11,373
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 59,373

Pemasangan 1 m2 acian
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.200 100,000 20,000
Tukang batu L.02 OH 0.100 120,000 12,000
Kepala tukang L.03 OH 0.0100 -
Mandor L.04 OH 0.0100 -
JUMLAH TENAGA KERJA 32,000
B BAHAN
Semen portland kg 3.250 1,340 4,355
JUMLAH HARGA BAHAN 4,355
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 36,355

PERMEN NO. 11/PRT/M/2013


HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING

Pemasangan 1 m' lantai keramik ukuran 30x30cm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.700 100,000 70,000
Tukang batu L.02 OH 0.350 120,000 42,000
Kepala tukang L.03 OH 0.0350 -
Mandor L.04 OH 0.0350 -
JUMLAH TENAGA KERJA 112,000
B BAHAN
Ubin keramik bh 11.870 - -
Semen portland kg 10.000 1,340 13,400
Semen warna kg 1.500 -
Pasir pasang m3 0.045 242,000 10,890
JUMLAH HARGA BAHAN 24,290
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 136,290

Pemasangan 1 m' lantai keramik ukuran 20x20cm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.700 100,000 70,000
Tukang batu L.02 OH 0.350 120,000 42,000
Kepala tukang L.03 OH 0.0350 -
Mandor L.04 OH 0.0350 -
JUMLAH TENAGA KERJA 112,000
B BAHAN
Ubin keramik bh 26.500 - -
Semen portland kg 10.400 1,340 13,936
Semen warna kg 1.620 - -
Pasing pasang m3 0.045 242,000 10,890
JUMLAH HARGA BAHAN 24,826
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 136,826

PERMEN NO. 11/PRT/M/2013


SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)

Pemasangan 1 m2 langit-langit tripleks ukuran (120x240)cm, tebal 3mm, 4mm, & 6mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.100 100,000 10,000
Tukang kayu L.02 OH 0.100 120,000 12,000
Kepala tukang L.03 OH 0.0100 -
Mandor L.04 OH 0.0050 -
JUMLAH TENAGA KERJA 22,000
B BAHAN
Tripleks Lbr 0.375 80,000 30,000
Paku tripleks kg 0.030 22,000 660
JUMLAH HARGA BAHAN 30,660
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 52,660

PERMEN NO. 11/PRT/M/2013


HARGA SATUAN PEKERJAAN PENUTUP ATAP

Pemasangan 1 m2 atap seng gelombang


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.120 100,000 12,000
Tukang kayu L.02 OH 0.060 120,000 7,200
Kepala tukang L.03 OH 0.0060 -
Mandor L.04 OH 0.0060 -
JUMLAH TENAGA KERJA 19,200
B BAHAN
Seng gel 3"-6" Bh 0.700 53,000 37,100
Paku biasa 1/2"-1" kg 0.020 22,000 440
JUMLAH HARGA BAHAN 37,540
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 56,740

Pemasangan 1 m2 nok atap seng


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.150 100,000 15,000
Tukang kayu L.02 OH 0.070 120,000 8,400
Kepala tukang L.03 OH 0.0070 -
Mandor L.04 OH 0.0060 -
JUMLAH TENAGA KERJA 23,400
B BAHAN
Seng plat 3"-6" bjls28 Bh 0.300 53,000 15,900
Paku biasa 1/2"-1" kg 0.040 22,000 880
JUMLAH HARGA BAHAN 16,780
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 40,180

PERMEN NO. 11/PRT/M/2013


HARGA SATUAN PEKERJAAN KAYU

Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas I
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 7.000 100,000 700,000
Tukang kayu L.02 OH 21.000 120,000 2,520,000
Kepala tukang L.03 OH 2.1000 -
Mandor L.04 OH 0.3500 -
JUMLAH TENAGA KERJA 3,220,000
B BAHAN
Balok kayu m3 1.100 2,800,000 3,080,000
Paku 10cm kg 1.250 22,000 27,500
Lem kayu kg 1.000 15,000 15,000
JUMLAH HARGA BAHAN 3,122,500
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 6,342,500

Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II dan III
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 6.000 100,000 600,000
Tukang kayu L.02 OH 18.000 120,000 2,160,000
Kepala tukang L.03 OH 1.8000 -
Mandor L.04 OH 0.3000 -
JUMLAH TENAGA KERJA 2,760,000
B BAHAN
Balok kayu m3 1.200 2,800,000 3,360,000
Paku 10cm kg 1.250 22,000 27,500
Lem kayu kg 1.000 15,000 15,000
JUMLAH HARGA BAHAN 3,402,500
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 6,162,500

Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I atau II


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 1.000 100,000 100,000
Tukang kayu L.02 OH 3.000 120,000 360,000
Kepala tukang L.03 OH 0.3000 -
Mandor L.04 OH 0.0500 -
JUMLAH TENAGA KERJA 460,000
B BAHAN
Papan kayu m3 0.040 45,000 1,800
Lem kayu kg 0.050 15,000 750
JUMLAH HARGA BAHAN 2,550
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 462,550

Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas I, II dan III bentang 6 m


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 4.000 100,000 400,000
Tukang kayu L.02 OH 12.000 120,000 1,440,000
Kepala tukang L.03 OH 1.2000 -
Mandor L.04 OH 0.2000 -
JUMLAH TENAGA KERJA 1,840,000
B BAHAN
Balok kayu m3 1.1000 45,000 49,500
Besi strip tebal 5mm kg 15.000 100,000 1,500,000
Paku 12cm kg 5.600 22,000 123,200
JUMLAH HARGA BAHAN 1,672,700
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 3,512,700

Pemasangan 1 m2 rangka langit-langit (50x100)cm, kayu kelas II dan III


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.150 100,000 15,000
Tukang kayu L.02 OH 0.300 120,000 36,000
Kepala tukang L.03 OH 0.0300 -
Mandor L.04 OH 0.0750 -
JUMLAH TENAGA KERJA 51,000
B BAHAN
Kaso-kaso 5x7cm m3 0.0154 45,000 693
Paku 7cm - 10cm kg 0.200 22,000 4,400
JUMLAH HARGA BAHAN 5,093
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 56,093

Pemasangan 1 m2 rangka langit-langit (60x60)cm, kayu kelas II dan III


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.200 100,000 20,000
Tukang kayu L.02 OH 0.300 120,000 36,000
Kepala tukang L.03 OH 0.0300 -
Mandor L.04 OH 0.0100 -
JUMLAH TENAGA KERJA 56,000
B BAHAN
Kaso-kaso 5x7cm m3 0.0163 45,000 734
Paku 7cm - 10cm kg 0.250 22,000 5,500
JUMLAH HARGA BAHAN 6,234
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 62,234

Pemasangan 1 m' listplank ukuran 3x20cm, kayu kelas I dan II


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.100 100,000 10,000
Tukang kayu L.02 OH 0.200 120,000 24,000
Kepala tukang L.03 OH 0.0200 -
Mandor L.04 OH 0.0050 -
JUMLAH TENAGA KERJA 34,000
B BAHAN
Papan kayu m3 0.0108 45,000 486
Paku 5cm - 7cm kg 0.100 22,000 2,200
JUMLAH HARGA BAHAN 2,686
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 36,686

PERMEN NO. 11/PRT/M/2013


HARGA SATUAN PEKERJAAN KUNCI DAN KACA

Pemasangan 1 buah kunci kamar mandi


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.005 100,000 500
Tukang kayu L.02 OH 0.500 120,000 60,000
Kepala tukang L.03 OH 0.0500 -
Mandor L.04 OH 0.0030 -
JUMLAH TENAGA KERJA 60,500
B BAHAN
Kunci tanam KM bh 1.0000 223,000 223,000
JUMLAH HARGA BAHAN 223,000
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 283,500


Pemasangan 1 buah engsel pintu
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.015 100,000 1,500
Tukang kayu L.02 OH 0.150 120,000 18,000
Kepala tukang L.03 OH 0.0150 -
Mandor L.04 OH 0.0008 -
JUMLAH TENAGA KERJA 19,500
B BAHAN
Engsel pintu bh 1.0000 39,000 39,000
JUMLAH HARGA BAHAN 39,000
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 58,500

Pemasangan 1 buah engsel jendela kupu-kupu


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.010 100,000 1,000
Tukang kayu L.02 OH 0.100 120,000 12,000
Kepala tukang L.03 OH 0.0100 -
Mandor L.04 OH 0.0005 -
JUMLAH TENAGA KERJA 13,000
B BAHAN
Engsel kupu-kupu bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 13,000

Pemasangan 1 buah engsel angin


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.010 100,000 1,000
Tukang kayu L.02 OH 0.200 120,000 24,000
Kepala tukang L.03 OH 0.0200 -
Mandor L.04 OH 0.0005 -
JUMLAH TENAGA KERJA 25,000
B BAHAN
Engsel angin bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 25,000


PERMEN NO. 11/PRT/M/2013
HARGA SATUAN PEKERJAAN PENGECATAN

Pengikisan/pengerokan permukaan cat lama


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.150 100,000
Mandor L.04 OH 0.0030 120,000 360
JUMLAH TENAGA KERJA 360
B BAHAN
Soda api kg 0.0500 15,000
JUMLAH HARGA BAHAN 15,000
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 15,360

Pencucian bidang permukaan tembok yang pernah dicat


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.150 100,000 15,000
Mandor L.04 OH 0.0030 120,000 360
JUMLAH TENAGA KERJA 15,360
B BAHAN
Sabun kg 0.0500 -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 15,360

Pengerokan karat pada permukaan baja cara manual


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.150 100,000 15,000
Mandor L.04 OH 0.0080 120,000 960
JUMLAH TENAGA KERJA 15,960
B BAHAN
Sabun kg 0.0500 -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 15,960

Pengecatan 1 m2 tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.020 100,000 2,000
Tukang cat L.02 OH 0.063 120,000 7,560
Kepala tukang L.03 OH 0.0063 -
Mandor L.04 OH 0.0030 -
JUMLAH TENAGA KERJA 9,560
B BAHAN
Plamuur kg 0.1000 9,000 900
Cat dasar kg 0.1000 105,000 10,500
Cat penutup kg 0.2600 105,000 27,300
JUMLAH HARGA BAHAN 38,700
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 48,260

Pengecatan 1 m2 tembok lama (1 lapis cat dasar, 2 lapis cat penutup)


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.028 100,000 2,800
Tukang cat L.02 OH 0.042 120,000 5,040
Kepala tukang L.03 OH 0.0042 -
Mandor L.04 OH 0.0030 -
JUMLAH TENAGA KERJA 7,840
B BAHAN
Cat dasar ltr 0.1200 105,000 12,600
Cat penutup kg 0.1800 105,000 18,900
JUMLAH HARGA BAHAN 31,500
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 39,340

PERMEN NO. 11/PRT/M/2013


HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG

Pemasangan 1 buah closet jongkok porselin


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 1.000 100,000 100,000
Tukang batu L.02 OH 1.500 120,000 180,000
Kepala tukang L.03 OH 0.1500 -
Mandor L.04 OH 0.1600 -
JUMLAH TENAGA KERJA 280,000
B BAHAN
Closet jongkok unit 1.0000 300,000 300,000
Semen portland kg 6.0000 1,340 8,040
Pasir pasang m3 0.0100 242,000 2,420
JUMLAH HARGA BAHAN 310,460
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 590,460

Pemasangan 1 buah bak kontrol pasangan bata 45x45 tinggi 50 cm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 3.200 100,000 320,000
Tukang batu L.02 OH 1.150 120,000 138,000
Kepala tukang L.03 OH 0.0110 -
Mandor L.04 OH 0.0160 -
JUMLAH TENAGA KERJA 458,000
B BAHAN
Bata merah bh 70.000 1,000 70,000
Semen portland kg 77.000 1,340 103,180
Pasir pasang m3 0.130 242,000 31,460
Pasir beton m3 0.090 306,000 27,540
Kerikil m3 0.020 505,000 10,100
Baja tulangan kg 2.600 18,561 48,258
JUMLAH HARGA BAHAN 290,538
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 748,538

Pemasangan 1 m' pipa galvanis φ ½"


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.054 100,000 5,400
Tukang batu L.02 OH 0.090 120,000 10,800
Kepala tukang L.03 OH 0.0090 -
Mandor L.04 OH 0.0270 -
JUMLAH TENAGA KERJA 16,200
B BAHAN
Pipa galvanis φ ½" bh 1.200 -
Sealtape % 35.000 5,000 175,000
JUMLAH HARGA BAHAN 175,000
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 191,200

Pemasangan 1 buah kran φ ½" atau ¾"


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.010 100,000 1,000
Tukang batu L.02 OH 0.400 120,000 48,000
Kepala tukang L.03 OH 0.0400 -
Mandor L.04 OH 0.0050 -
JUMLAH TENAGA KERJA 49,000
B BAHAN
Kran air bh 1.000 15,000 15,000
Sealtape bh 0.025 5,000 125
JUMLAH HARGA BAHAN 15,125
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 64,125

Pemasangan 1 m' pipa galvanis φ ¾"


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.054 100,000 5,400
Tukang batu L.02 OH 0.090 120,000 10,800
Kepala tukang L.03 OH 0.0090 -
Mandor L.04 OH 0.0270 -
JUMLAH TENAGA KERJA 16,200
B BAHAN
Pipa galvanis φ ¾" m' 1.200 227,000 272,400
Perlengkapan % 35.000 -
JUMLAH HARGA BAHAN 272,400
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 288,600

Pemasangan 1 m' pipa galvanis φ 1"


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.054 100,000 5,400
Tukang batu L.02 OH 0.090 120,000 10,800
Kepala tukang L.03 OH 0.0090 -
Mandor L.04 OH 0.0270 -
JUMLAH TENAGA KERJA 16,200
B BAHAN
Pipa galvanis φ 1" m' 1.200 527,000 632,400
Perlengkapan % 35.000 -
JUMLAH HARGA BAHAN 632,400
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 648,600

Pemasangan 1 m' pipa PVC tipe AW φ ½"


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.036 100,000 3,600
Tukang batu L.02 OH 0.060 120,000 7,200
Kepala tukang L.03 OH 0.0060 -
Mandor L.04 OH 0.0020 -
JUMLAH TENAGA KERJA 10,800
B BAHAN
Pipa PVC φ ½" m' 1.200 -
Perlengkapan % 35.000 -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 10,800

Pemasangan 1 m' pipa PVC tipe AW φ ¾"


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.036 100,000 3,600
Tukang batu L.02 OH 0.060 120,000 7,200
Kepala tukang L.03 OH 0.0060 -
Mandor L.04 OH 0.0020 -
JUMLAH TENAGA KERJA 10,800
B BAHAN
Pipa PVC φ ¾" m' 1.200 17,500 21,000
Perlengkapan % 35.000 -
JUMLAH HARGA BAHAN 21,000
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 31,800

Pemasangan 1 m' pipa PVC tipe AW φ 1"


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.036 100,000 3,600
Tukang batu L.02 OH 0.060 120,000 7,200
Kepala tukang L.03 OH 0.0060 -
Mandor L.04 OH 0.0020 -
JUMLAH TENAGA KERJA 10,800
B BAHAN
Pipa PVC φ 1" m' 1.200 -
Perlengkapan % 35.000 -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 10,800

Pemasangan 1 m' pipa PVC tipe AW φ 1½"


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.045 100,000 4,500
Tukang batu L.02 OH 0.090 120,000 10,800
Kepala tukang L.03 OH 0.0090 -
Mandor L.04 OH 0.0030 -
JUMLAH TENAGA KERJA 15,300
B BAHAN
Pipa PVC φ 1½" m' 1.200 95,000 114,000
Perlengkapan % 35.000 -
JUMLAH HARGA BAHAN 114,000
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 129,300

Pemasangan 1 m' pipa PVC tipe AW φ 2"


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.045 100,000 4,500
Tukang batu L.02 OH 0.090 120,000 10,800
Kepala tukang L.03 OH 0.0090 -
Mandor L.04 OH 0.0030 -
JUMLAH TENAGA KERJA 15,300
B BAHAN
Pipa PVC φ 2" m' 1.200 120,000 144,000
Perlengkapan % 35.000 -
JUMLAH HARGA BAHAN 144,000
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 159,300

Pemasangan 1 m' pipa PVC tipe AW φ 2½"


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.081 100,000 8,100
Tukang batu L.02 OH 0.135 120,000 16,200
Kepala tukang L.03 OH 0.0135 -
Mandor L.04 OH 0.0040 -
JUMLAH TENAGA KERJA 24,300
B BAHAN
Pipa PVC φ 2½" m' 1.200 -
Perlengkapan % 35.000 -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 24,300

Pemasangan 1 m' pipa PVC tipe AW φ 3"


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.081 100,000 8,100
Tukang batu L.02 OH 0.135 120,000 16,200
Kepala tukang L.03 OH 0.0135 -
Mandor L.04 OH 0.0040 -
JUMLAH TENAGA KERJA 24,300
B BAHAN
Pipa PVC φ 3" m' 1.200 265,000 318,000
Perlengkapan % 35.000 -
JUMLAH HARGA BAHAN 318,000
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 342,300

Pemasangan 1 m' pipa PVC tipe AW φ 4"


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.081 100,000 8,100
Tukang batu L.02 OH 0.135 120,000 16,200
Kepala tukang L.03 OH 0.0135 -
Mandor L.04 OH 0.0040 -
JUMLAH TENAGA KERJA 24,300
B BAHAN
Pipa PVC φ 4" m' 1.200 -
Perlengkapan % 35.000 -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 24,300


PERMEN NO. 11/PRT/M/2013
HARGA SATUAN PEKERJAAN PEMASANGAN PIPA

Pemasangan 1 m' pipa PVC φ 63 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.081 100,000 8,100
Tukang pipa L.02 OH 0.041 120,000 4,920
Mandor L.04 OH 0.008 -
JUMLAH TENAGA KERJA 13,020
B BAHAN
Pipa PVC φ 63 mm m' 1.000 120,000 120,000
JUMLAH HARGA BAHAN 120,000
C PERALATAN
Sewa Tripot/Tackel & hndle
crane 2 T hari 0.006 -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 133,020

Pemasangan 1 m' pipa PVC φ 90 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.094 100,000 9,400
Tukang pipa L.02 OH 0.047 120,000 5,640
Mandor L.04 OH 0.009 -
JUMLAH TENAGA KERJA 15,040
B BAHAN
Pipa PVC φ 90 mm m' 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & hndle
crane 2 T hari 0.008 -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 15,040

Pemasangan 1 m' pipa PVC φ 110 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.105 100,000 10,500
Tukang pipa L.02 OH 0.053 120,000 6,360
Mandor L.04 OH 0.011 -
JUMLAH TENAGA KERJA 16,860
B BAHAN
Pipa PVC φ 110 mm m' 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & hndle
crane 2 T hari 0.010 -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 16,860


Pemasangan 1 m' pipa PVC φ 150 mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.118 100,000 11,800
Tukang pipa L.02 OH 0.059 120,000 7,080
Mandor L.04 OH 0.012 -
JUMLAH TENAGA KERJA 18,880
B BAHAN
Pipa PVC φ 150 mm m' 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & hndle
crane 2 T hari 0.012 -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 18,880

Pemasangan 1 m' pipa PVC φ 200 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.189 100,000 18,900
Tukang pipa L.02 OH 0.095 120,000 11,400
Mandor L.04 OH 0.019 -
JUMLAH TENAGA KERJA 30,300
B BAHAN
Pipa PVC φ 200 mm m' 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & hndle
crane 2 T hari 0.024 -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 30,300

Pemasangan 1 m' pipa PVC φ 250 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.256 100,000 25,600
Tukang pipa L.02 OH 0.128 120,000 15,360
Mandor L.04 OH 0.026 -
JUMLAH TENAGA KERJA 40,960
B BAHAN
Pipa PVC φ 250 mm m' 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & hndle
crane 2 T hari 0.034 -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 40,960

Pemasangan 1 m' pipa PVC φ 300 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.294 100,000 29,400
Tukang pipa L.02 OH 0.147 120,000 17,640
Mandor L.04 OH 0.029 -
JUMLAH TENAGA KERJA 47,040
B BAHAN
Pipa PVC φ 300 mm m' 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & hndle
crane 2 T hari 0.040 -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 47,040

Pemasangan 1 m' pipa PVC φ 400 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.544 100,000 54,400
Tukang pipa L.02 OH 0.272 120,000 32,640
Mandor L.04 OH 0.054 -
JUMLAH TENAGA KERJA 87,040
B BAHAN
Pipa PVC φ 400 mm m' 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & hndle
crane 2 T hari 0.080 -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 87,040

Pemasangan 1 m' pipa PVC φ 450 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.669 100,000 66,900
Tukang pipa L.02 OH 0.335 120,000 40,200
Mandor L.04 OH 0.067 -
JUMLAH TENAGA KERJA 107,100
B BAHAN
Pipa PVC φ 450 mm m' 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & hndle
crane 2 T hari 0.100 -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 107,100

Pemasangan 1 m' pipa PVC φ 500 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.809 100,000 80,900
Tukang pipa L.02 OH 0.405 120,000 48,600
Mandor L.04 OH 0.081 -
JUMLAH TENAGA KERJA 129,500
B BAHAN
Pipa PVC φ 500 mm m' 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & hndle
crane 2 T hari 0.122 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 129,500

Pemasangan 1 m' pipa PVC φ 600 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.957 100,000 95,700
Tukang pipa L.02 OH 0.479 120,000 57,480
Mandor L.04 OH 0.096 -
JUMLAH TENAGA KERJA 153,180
B BAHAN
Pipa PVC φ 600 mm m' 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & hndle
crane 2 T hari 0.145 -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 153,180

Pemasangan 1 m' pipa PVC φ 800 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 1.618 100,000 161,800
Tukang pipa L.02 OH 0.809 120,000 97,080
Mandor L.04 OH 0.162 -
JUMLAH TENAGA KERJA 258,880
B BAHAN
Pipa PVC φ 800 mm m' 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & hndle
crane 2 T hari 0.250 -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 258,880

Pemasangan 1 m' pipa PVC φ 900 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 1.691 100,000 169,100
Tukang pipa L.02 OH 0.846 120,000 101,520
Mandor L.04 OH 0.169 -
JUMLAH TENAGA KERJA 270,620
B BAHAN
Pipa PVC φ 900 mm m' 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & hndle
crane 2 T hari 0.262 -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C)

Pemasangan 1 m' pipa PVC φ 1000 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 1.895 100,000 189,500
Tukang pipa L.02 OH 0.948 120,000 113,760
Mandor L.04 OH 0.190 -
JUMLAH TENAGA KERJA 303,260
B BAHAN
Pipa PVC φ 1000 mm m' 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & hndle
crane 2 T hari 0.294 -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 303,260

Pemasangan 1 m' pipa HDPE φ 63 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.035 100,000 3,500
Tukang pipa L.02 OH 0.017 120,000 2,040
Mandor L.04 OH 0.003 -
JUMLAH TENAGA KERJA 5,540
B BAHAN
Pipa HDPE φ 63 mm m' 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & hndle
crane 2 T hari 0.019 -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 5,540

Pemasangan 1 m' pipa HDPE φ 100 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.040 100,000 4,000
Tukang pipa L.02 OH 0.020 120,000 2,400
Mandor L.04 OH 0.004 -
JUMLAH TENAGA KERJA 6,400
B BAHAN
Pipa HDPE φ 100 mm m' 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & hndle
crane 2 T hari 0.019 -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 6,400

Pemasangan 1 m' pipa HDPE φ 125 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.045 100,000 4,500
Tukang pipa L.02 OH 0.023 120,000 2,760
Mandor L.04 OH 0.005 -
JUMLAH TENAGA KERJA 7,260
B BAHAN
Pipa HDPE φ 125 mm m' 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & hndle
crane 2 T hari 0.019 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 7,260

Pemasangan 1 m' pipa HDPE φ 150 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.062 100,000 6,200
Tukang pipa L.02 OH 0.031 120,000 3,720
Mandor L.04 OH 0.006 -
JUMLAH TENAGA KERJA 9,920
B BAHAN
Pipa HDPE φ 150 mm m' 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & hndle
crane 2 T hari 0.019 -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 9,920

Pemasangan 1 m' pipa HDPE φ 200 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.102 100,000 10,200
Tukang pipa L.02 OH 0.051 120,000 6,120
Mandor L.04 OH 0.010 -
JUMLAH TENAGA KERJA 16,320
B BAHAN
Pipa HDPE φ 200 mm m' 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & hndle
crane 2 T hari 0.019 -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 16,320

Pemasangan 1 m' pipa HDPE φ 250 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.133 100,000 13,300
Tukang pipa L.02 OH 0.067 120,000 8,040
Mandor L.04 OH 0.013 -
JUMLAH TENAGA KERJA 21,340
B BAHAN
Pipa HDPE φ 250 mm m' 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & hndle
crane 2 T hari 0.042 -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 21,340

Pemasangan 1 m' pipa GIP φ 63 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.345 100,000 34,500
Tukang pipa L.02 OH 0.172 120,000 20,640
Mandor L.04 OH 0.034 -
JUMLAH TENAGA KERJA 55,140
B BAHAN
Pipa GIP φ 63 mm m' 1.000 720,000 720,000
JUMLAH HARGA BAHAN 720,000
C PERALATAN
Sewa Tripot/Tackel & hndle
crane 2 T hari -
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 775,140

Pemasangan 1 m' pipa GIP φ 100 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.400 100,000 40,000
Tukang pipa L.02 OH 0.200 120,000 24,000
Mandor L.04 OH 0.040 -
JUMLAH TENAGA KERJA 64,000
B BAHAN
Pipa GIP φ 100 mm m' 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & hndle
crane 2 T hari -
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 64,000

Pemasangan 1 m' pipa GIP φ 125 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.448 -
Tukang pipa L.02 OH 0.224 -
Mandor L.04 OH 0.045 -
JUMLAH TENAGA KERJA -
B BAHAN
Pipa GIP φ 125 mm m' 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & hndle
crane 2 T hari -
JUMLAH HARGA ALAT

D Jumlah (A+B+C) -

PERMEN NO. 11/PRT/M/2013


HARGA SATUAN PEKERJAAN PEMASANGAN AKSESORIS PIPA

Pemasangan 1 buah Valve φ 150 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 1.429 100,000 142,900
Tukang pipa L.02 OH 0.715 120,000 85,800
Mandor L.04 OH 0.143 -
JUMLAH TENAGA KERJA 228,700
B BAHAN
Valve φ 150 mm bh 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
crane 2T hari 0.100 -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 228,700

Pemasangan 1 buah Tee φ 150 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.106 100,000 10,600
Tukang pipa L.02 OH 0.053 120,000 6,360
Mandor L.04 OH 0.011 -
JUMLAH TENAGA KERJA 16,960
B BAHAN
Tee φ 150 mm bh 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
crane 2T hari 0.028 -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 16,960

Pemasangan 1 buah Tee φ 200 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.216 -
Tukang pipa L.02 OH 0.108 -
Mandor L.04 OH 0.022 -
JUMLAH TENAGA KERJA -
B BAHAN
Tee φ 200 mm bh 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
crane 2T hari 0.029 -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) -

PERMEN NO. 11/PRT/M/2013


HARGA SATUAN PEKERJAAN PENYAMBUNGAN PIPA BARU KE PIPA LAMA

Penyambungan 1 buah pipa baru ke pipa yang ada φ 80 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 2.416 100,000 241,600
Tukang pipa L.02 OH 1.208 120,000 144,960
Mandor L.04 OH 0.242 -
JUMLAH TENAGA KERJA 386,560
B BAHAN
Pipa φ 80 mm bh 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
T2/mekanik/cilinder/saw hari 0.606 -
Sewa Genset 1500 watt hari 0.075 -

Sewa pompa submersible 3m3/h hari 0.968 -


Sewa Tripot/Tackel & handle
crane 2T hari 0.865 -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 386,560

Penyambungan 1 buah pipa baru ke pipa yang ada φ 100 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 1.646 100,000 164,600
Tukang pipa L.02 OH 0.823 120,000 98,760
Mandor L.04 OH 0.165 -
JUMLAH TENAGA KERJA 263,360
B BAHAN
Pipa φ 100 mm bh 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
T2/mekanik/cilinder/saw hari 0.65 -
Sewa Genset 1500 watt hari 0.159 -

Sewa pompa submersible 3m3/h hari 1.078 -


Sewa Tripot/Tackel & handle
crane 2T hari 0.911 -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 263,360

Penyambungan 1 buah pipa baru ke pipa yang ada φ 150 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 2.096 100,000 209,600
Tukang pipa L.02 OH 1.048 120,000 125,760
Mandor L.04 OH 0.210 -
JUMLAH TENAGA KERJA 335,360
B BAHAN
Pipa φ 150 mm bh 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
T2/mekanik/cilinder/saw hari 0.76 -
Sewa Genset 1500 watt hari 0.369 -

Sewa pompa submersible 3m3/h hari 1.353 -


Sewa Tripot/Tackel & handle
crane 2T hari 1.026 -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 335,360


PERMEN NO. 11/PRT/M/2013
HARGA SATUAN PEKERJAAN PENGETESAN PIPA

Pengetesan 1 m pipa φ 50 mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.008 100,000 800
Mandor L.04 OH 0.0008 -
JUMLAH TENAGA KERJA 800
B BAHAN
Air test (air bersih) m3 0.002 -
Bahan bakar ltr 0.06 -
Oli ltr 0.002 -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 800

Pengetesan 1 m pipa φ 75 mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.008 100,000 800
Mandor L.04 OH 0.0008 -
JUMLAH TENAGA KERJA 800
B BAHAN
Air test (air bersih) m3 0.004 -
Bahan bakar ltr 0.06 -
Oli ltr 0.002 -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 800

Pengetesan 1 m pipa φ 100 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.008 100,000 800
Mandor L.04 OH 0.0008 -
JUMLAH TENAGA KERJA 800
B BAHAN
Air test (air bersih) m3 0.008 -
Bahan bakar ltr 0.06 -
Oli ltr 0.002 -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 800

Pengetesan 1 m pipa φ 150 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.008 100,000 800
Mandor L.04 OH 0.0008 -
JUMLAH TENAGA KERJA 800
B BAHAN
Air test (air bersih) m3 0.018 -
Bahan bakar ltr 0.06 -
Oli ltr 0.002 -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 800

Pengetesan 1 m pipa φ 200 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.008 100,000 800
Mandor L.04 OH 0.0008 -
JUMLAH TENAGA KERJA 800
B BAHAN
Air test (air bersih) m3 0.031 -
Bahan bakar ltr 0.06 -
Oli ltr 0.002 -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 800

Pengetesan 1 m pipa φ 250 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.008 100,000 800
Mandor L.04 OH 0.0008 -
JUMLAH TENAGA KERJA 800
B BAHAN
Air test (air bersih) m3 0.049 -
Bahan bakar ltr 0.06 -
Oli ltr 0.002 -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 800

Pengetesan 1 m pipa φ 300 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA 100,000
Pekerja L.02 OH 0.008 -
Mandor L.04 OH 0.0008 -
JUMLAH TENAGA KERJA -
B BAHAN
Air test (air bersih) m3 0.071 -
Bahan bakar ltr 0.06 -
Oli ltr 0.002 -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) -
Pengetesan 1 m pipa φ 400 mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.008 100,000 800
Mandor L.04 OH 0.0008 -
JUMLAH TENAGA KERJA 800
B BAHAN
Air test (air bersih) m3 0.126 -
Bahan bakar ltr 0.06 -
Oli ltr 0.002 -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 800

Pengetesan 1 m pipa φ 500 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.008 100,000 800
Mandor L.04 OH 0.0008 -
JUMLAH TENAGA KERJA 800
B BAHAN
Air test (air bersih) m3 0.158 -
Bahan bakar ltr 0.06 -
Oli ltr 0.002 -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 800

Pengetesan 1 m pipa φ 600 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.008 100,000 800
Mandor L.04 OH 0.0008 -
JUMLAH TENAGA KERJA 800
B BAHAN
Air test (air bersih) m3 0.283 -
Bahan bakar ltr 0.06 -
Oli ltr 0.002 -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 800


Analisa_136 - 358

DAFTAR ANALISA BIAYA KONTRUKSI

PROGRAM : PAMSIMAS
PEKERJAAN : SARANA AIR MINUM DAN SANITASI
LOKASI : DESA PALIPPU/ KEC. TANASITOLO
TAHUN ANGGARAN : 2019

SNI 03-2835:1992
ANALISA BIAYA KONSTRUKSI PEKERJAAN PERSIAPAN

1. 1 m2 Membersihkan lapangan dan pemerataan


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.100 100,000.00 10,000.00
2. Tukang Kayu Hari/Orang - 120,000.00 -
3. Kepala Tukang Hari/Orang - -
4. Mandor Hari/Orang 0.050 -
JUMLAH 10,000.00
JUMLAH 10,000.00

2. 1 m' Pengukuran dan pemasangan bouwplank


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.100 100,000.00 10,000.00
2. Tukang Kayu Hari/Orang 0.100 120,000.00 12,000.00
3. Kepala Tukang Hari/Orang 0.010 -
4. Mandor Hari/Orang 0.005 -
JUMLAH 22,000.00

B. BAHAN
1. Kayu Klas III uk. 5/7 m3 0.012 2,800,000.00 33,600.00
2. Paku biasa 2" - 5" Kg 0.020 22,000.00 440.00
3. Kayu papan 3/20 m3 0.007 2,800,000.00 19,600.00
JUMLAH 53,640.00
JUMLAH A + B 75,640.00

SNI 2835:2008
ANALISA BIAYA KONSTRUKSI PEKERJAAN TANAH

6.1 1 m3 Galian tanah biasa sedalam 1 meter


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.750 100,000.00 75,000.00
2. Tukang Gali Hari/Orang - 120,000.00 -
3. Kepala Tukang Hari/Orang - - -
4. Mandor Hari/Orang 0.025 - -
JUMLAH A 75,000.00

6.2 1 m3 Galian tanah biasa sedalam 2 meter


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.900 100,000.00 90,000.00
2. Tukang Gali Hari/Orang - 120,000.00 -
3. Kepala Tukang Hari/Orang - - -
4. Mandor Hari/Orang 0.045 - -
JUMLAH A 90,000.00

6.3 1 m3 Galian tanah biasa sedalam 3 meter


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
Analisa_137 - 358

1. Pekerja Hari/Orang 1.050 100,000.00 105,000.00


2. Tukang Gali Hari/Orang - 120,000.00 -
3. Kepala Tukang Hari/Orang - - -
4. Mandor Hari/Orang 0.067 - -
JUMLAH A 105,000.00
Analisa_138 - 358

6.4 1 m3 Galian tanah keras sedalam 1 meter


SATUAN HARGA SATUAN BIAYA SATUAN
NO. URAIAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 1.000 100,000.00 100,000.00
2. Tukang Gali Hari/Orang - 120,000.00 -
3. Kepala Tukang Hari/Orang - -
4. Mandor Hari/Orang 0.032 -
JUMLAH A 100,000.00

6.5 1 m3 Galian tanah cadas sedalam 1 meter


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 1.500 100,000.00 150,000.00
2. Tukang Gali Hari/Orang - 120,000.00 -
3. Kepala Tukang Hari/Orang - - -
4. Mandor Hari/Orang 0.060 - -
JUMLAH A 150,000.00

6.6 1 m3 Galian tanah lumpur sedalam 1 meter


SATUAN HARGA SATUAN BIAYA SATUAN
NO. URAIAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 1.200 100,000.00 120,000.00
2. Tukang Gali Hari/Orang - 120,000.00 -
3. Kepala Tukang Hari/Orang - -
4. Mandor Hari/Orang 0.045 -
JUMLAH A 120,000.00

6.9 1 m3 Urugan kembali

Mengurug kembali 1 m3 galian dihitung dari 1/3 dari indeks pekerjaan galian

6.10 1 m3 Pemadatan tanah (per 20 cm)


SATUAN HARGA SATUAN BIAYA SATUAN
NO. URAIAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.500 100,000.00 50,000.00
2. Tukang Gali Hari/Orang - 120,000.00 -
3. Kepala Tukang Hari/Orang - -
4. Mandor Hari/Orang 0.050 -
JUMLAH A 50,000.00

6.11 1 m3 Urugan pasir


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.300 100,000.00 30,000.00
2. Tukang Gali Hari/Orang - 120,000.00 -
3. Kepala Tukang Hari/Orang - -
4. Mandor Hari/Orang 0.010 -
JUMLAH A 30,000.00

B. BAHAN
1. Pasir urug m3 1.200 242,000.00 290,400.00
JUMLAH 290,400.00
JUMLAH A + B 320,400.00
Analisa_139 - 358

6.14 1 m3 Pemasangan lapisan ijuk tebal 10 cm, untuk bidang resapan


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.150 100,000.00 15,000.00
2. Tukang Gali Hari/Orang - - -
3. Kepala Tukang Hari/Orang - -
4. Mandor Hari/Orang 0.015 -
JUMLAH A 15,000.00

B. BAHAN
1. Ijuk m3 6.000 35,000.00 210,000.00
JUMLAH 210,000.00
JUMLAH A + B 225,000.00
sirtu padat untuk peninggian lantai bangunan
6.15
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.250 100,000.00 25,000.00
2. Tukang Gali Hari/Orang - 120,000.00 -
3. Kepala Tukang Hari/Orang - -
4. Mandor Hari/Orang 0.025 - -
JUMLAH A 25,000.00

B. BAHAN
1. Sirtu m3 1.200 242,000.00 290,400.00
JUMLAH 290,400.00
JUMLAH A + B 315,400.00

SNI 2836:2008
ANALISA BIAYA KONSTRUKSI PEKERJAAN PONDASI

6.1 Memasang 1 m3 pondasi batu belah, campuran 1 PC : 3 PP


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 1.500 100,000.00 150,000.00
2. Tukang Batu Hari/Orang 0.750 120,000.00 90,000.00
3. Kepala Tukang Hari/Orang 0.075 -
4. Mandor Hari/Orang 0.075 -
JUMLAH 240,000.00

B. BAHAN
1. Batu belah 15/20 cm m3 1.200 395,000.00 474,000.00
2. Semen Portland kg 202.000 1,340.00 270,680.00
3. Pasir pasang m3 0.485 242,000.00 117,370.00
JUMLAH 862,050.00
JUMLAH A + B 1,102,050.00

6.2 Memasang 1 m3 pondasi batu belah, campuran 1 PC : 4 PP


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 1.500 100,000.00 150,000.00
2. Tukang Batu Hari/Orang 0.750 120,000.00 90,000.00
3. Kepala Tukang Hari/Orang 0.075 -
4. Mandor Hari/Orang 0.075 -
JUMLAH 240,000.00

B. BAHAN
Analisa_140 - 358

1. Batu belah 15/20 cm m3 1.200 395,000.00 474,000.00


2. Semen Portland Kg 163.000 1,340.00 218,420.00
3. Pasir pasang m3 0.520 242,000.00 125,840.00
JUMLAH 818,260.00
JUMLAH A + B 1,058,260.00
Analisa_141 - 358

6.9 Memasang 1 m3 batu kosong (anstamping)


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.780 100,000.00 78,000.00
2. Tukang Batu Hari/Orang 0.390 120,000.00 46,800.00
3. Kepala Tukang Hari/Orang 0.039 -
4. Mandor Hari/Orang 0.039 -
JUMLAH 124,800.00

B. BAHAN
1. Batu belah 15/20 cm m3 1.200 395,000.00 474,000.00
2. Pasir urug m3 0.432 242,000.00 104,544.00
JUMLAH 578,544.00
JUMLAH A + B 703,344.00

6.11 Memasang 1 m3 pondasi sumuran, diameter 100 cm


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 2.400 100,000.00 240,000.00
2. Tukang Batu Hari/Orang 0.800 120,000.00 96,000.00
3. Kepala Tukang Hari/Orang 0.080 -
4. Mandor Hari/Orang 0.119 -
JUMLAH 336,000.00

B. BAHAN
1. Batu belah 15/20 cm m3 0.450 395,000.00 177,750.00
1. Semen Portland m4 194.000 1,340.00 259,960.00
2. Pasir beton m3 0.312 306,000.00 95,472.00
2. Kerikil (maksimum 40 mm) m3 0.468 505,000.00 236,340.00
JUMLAH 769,522.00
JUMLAH A + B 1,105,522.00

- Memasang 1 buah Beronjong (2 x 1 x 0,5) = 1 m³


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 3.000 100,000.00 300,000.00
2. Tukang Hari/Orang 0.050 120,000.00 6,000.00
JUMLAH 306,000.00

B. BAHAN
1. Kawat Beronjong Buah 1.000 420,000.00 420,000.00
1. Batu Kali 10/20 cm m³ 1.200 395,000.00 474,000.00
JUMLAH 894,000.00
JUMLAH A + B 1,200,000.00

SNI 7394:2008
ANALISA BIAYA KONSTRUKSI PEKERJAAN BETON

6.4 Membuat 1 m³ lantai kerja beton mutu f'c = 7,4 Mpa (K 100), slump (3-6) cm, w/c = 0,87
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 1.650 100,000.00 165,000.00
2. Tukang Batu Hari/Orang 0.275 120,000.00 33,000.00
3. Kepala Tukang Hari/Orang 0.028 -
4. Mandor Hari/Orang 0.083 -
Analisa_142 - 358

JUMLAH 198,000.00

B. BAHAN
1. Semen Portland kg 230.000 1,340.00 308,200.00
2. Pasir beton m³ 0.638 245,000.00 156,275.00
3. Batu Pecah 2-3 m³ 0.761 591,000.00 449,597.78
4. Air Liter 200.000 - -
JUMLAH 914,072.78
JUMLAH A + B 1,112,072.78
Analisa_143 - 358

6.5 Membuat 1 m³ beton mutu f'c = 14,5 Mpa (K 175), slump (12 ± 2) cm, w/c = 0,66
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 1.650 100,000.00 165,000.00
2. Tukang Batu Hari/Orang 0.275 120,000.00 33,000.00
3. Kepala Tukang Hari/Orang 0.028 -
4. Mandor Hari/Orang 0.083 -
JUMLAH 198,000.00

B. BAHAN
1. Semen Portland kg 326.000 1,340.00 436,840.00
2. Pasir beton m³ 0.543 245,000.00 133,000.00
3. Batu Pecah 2-3 m³ 0.762 591,000.00 450,473.33
4. Air Liter 215.000 - -
JUMLAH 1,020,313.33
JUMLAH A + B 1,218,313.33

6.6 Membuat 1 m3 beton mutu f'c =16,9 Mpa (K200) slump (12+-2) cm, w/c = 0,61
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 1.650 100,000.00 165,000.00
2. Tukang Batu Hari/Orang 0.275 120,000.00 33,000.00
3. Kepala Tukang Hari/Orang 0.280 -
4. Mandor Hari/Orang 0.083 -
JUMLAH 198,000.00

B. BAHAN
1. Semen Portland kg 352.000 1,340.00 471,680.00
2. Pasir beton m³ 0.522 245,000.00 127,925.00
3. Batu Pecah 2-3 m³ 0.764 591,000.00 451,348.89
4. Air Liter 215.000 - -
JUMLAH 1,050,953.89
JUMLAH A + B 1,248,953.89

6.7 Membuat 1 m3 beton mutu f'c =19,3 Mpa (K225) slump (12+-2) cm, w/c = 0,58
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 1.650 100,000.00 165,000.00
2. Tukang Batu Hari/Orang 0.275 120,000.00 33,000.00
3. Kepala Tukang Hari/Orang 0.280 -
4. Mandor Hari/Orang 0.083 -
JUMLAH 198,000.00

B. BAHAN
1. Semen Portland kg 371.000 1,340.00 497,140.00
2. Pasir beton m³ 0.499 245,000.00 122,150.00
3. Batu Pecah 2-3 m³ 0.776 591,000.00 458,353.33
4. Air Liter 215.000 - -
JUMLAH 1,077,643.33
JUMLAH A + B 1,275,643.33

6.17 Pembesian 10 kg dengan besi polos atau besi ulir


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.070 100,000.00 7,000.00
2. Tukang Besi Hari/Orang 0.070 120,000.00 8,400.00
Analisa_144 - 358

3. Kepala Tukang Hari/Orang 0.007 -


4. Mandor Hari/Orang 0.004 -
JUMLAH 15,400.00

B. BAHAN
1. Besi beton (polos/ulir) Kg 10.500 9,500.00 99,750.00
2. Kawat beton Kg 0.150 23,000.00 3,450.00
JUMLAH 103,200.00
JUMLAH A + B 118,600.00
Pembesian 1 Kg dengan besi polos atau ulir 11,860.00
Analisa_145 - 358

6.17 Pembesian 1 kg dengan besi polos atau besi ulir


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.0070 100,000.00 700.00
2. Tukang Besi Hari/Orang 0.0070 120,000.00 840.00
3. Kepala Tukang Hari/Orang 0.0007 -
4. Mandor Hari/Orang 0.0004 -
JUMLAH 1,540.00

B. BAHAN
1. Besi beton (polos/ulir) Kg 1.050 9,500.00 9,975.00
2. Kawat beton Kg 0.015 23,000.00 345.00
JUMLAH 10,320.00
JUMLAH A + B 11,860.00

6.20 Memasang 1 m2 bekisting untuk pondasi


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.520 100,000.00 52,000.00
2. Tukang Kayu Hari/Orang 0.260 120,000.00 31,200.00
3. Kepala Tukang Hari/Orang 0.026 -
4. Mandor Hari/Orang 0.026 -
JUMLAH 83,200.00

B. BAHAN
1. Kayu kelas III m3 0.040 2,800,000.00 112,000.00
2. Paku 5 cm - 10 cm Kg 0.300 22,000.00 6,600.00
3. Minyak bekisting Ltr 0.100 - -
JUMLAH 118,600.00
JUMLAH A + B 201,800.00

6.21 Memasang 1 m2 bekisting untuk sloof


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.520 100,000.00 52,000.00
2. Tukang Kayu Hari/Orang 0.260 120,000.00 31,200.00
3. Kepala Tukang Hari/Orang 0.026 - -
4. Mandor Hari/Orang 0.026 -
JUMLAH 83,200.00

B. BAHAN
1. Kayu kelas III m3 0.045 2,800,000.00 126,000.00
2. Paku 5 cm - 10 cm Kg 0.300 22,000.00 6,600.00
3. Minyak bekisting Ltr 0.100 - -
JUMLAH 132,600.00
JUMLAH A + B 215,800.00
Analisa_146 - 358

6.22 Memasang 1 m2 bekisting untuk kolom


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.660 100,000.00 66,000.00
2. Tukang Kayu Hari/Orang 0.330 120,000.00 39,600.00
3. Kepala Tukang Hari/Orang 0.033 - -
4. Mandor Hari/Orang 0.033 - -
JUMLAH 105,600.00

B. BAHAN
1. Kayu Kelas III m3 0.040 2,800,000.00 112,000.00
2. Paku 5 cm - 12 cm Kg 0.400 22,000.00 8,800.00
3. Minyak bekisting Ltr 0.200 - -
4. Balok kayu Kls. II m3 0.015 2,800,000.00 42,000.00
5. Plywood tebal 9 mm Lmbr 0.350 110,000.00 38,500.00
6. bambu Btg 2.000 #NAME? #NAME?
JUMLAH #NAME?
JUMLAH A + B #NAME?

6.23 Memasang 1 m2 bekisting untuk balok


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.660 100,000.00 66,000.00
2. Tukang Kayu Hari/Orang 0.330 120,000.00 39,600.00
3. Kepala Tukang Hari/Orang 0.033 - -
4. Mandor Hari/Orang 0.033 - -
JUMLAH 105,600.00

B. BAHAN
1. Kayu Kelas III m3 0.040 2,800,000.00 112,000.00
2. Paku 5 cm - 12 cm Kg 0.400 22,000.00 8,800.00
3. Minyak bekisting Ltr 0.200 - -
4. Balok kayu Kls. II m3 0.018 2,800,000.00 50,400.00
5. Plywood tebal 9 mm Lmbr 0.350 110,000.00 38,500.00
6. Dolken kayu galam, Φ (8-10) cm, p = 4 m Btg 2.000 #NAME? #NAME?
JUMLAH #NAME?
JUMLAH A + B #NAME?

6.24 Memasang 1 m2 bekisting untuk plat lantai


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.660 100,000.00 66,000.00
2. Tukang Kayu Hari/Orang 0.330 120,000.00 39,600.00
3. Kepala Tukang Hari/Orang 0.033 -
4. Mandor Hari/Orang 0.033 -
JUMLAH 105,600.00

B. BAHAN
1. Kayu kelas III m3 0.040 2,800,000.00 112,000.00
2. Paku 5 cm - 12 cm Kg 0.400 22,000.00 8,800.00
3. Minyak bekisting Ltr 0.200 - -
4. Balok kayu Kls. II m3 0.015 2,800,000.00 42,000.00
5. Plywood tebal 9 mm Lmbr 0.350 110,000.00 38,500.00
6. Dolken kayu galam, Φ (8-10) cm, p = 4 m Btg 6.000 #NAME? #NAME?
JUMLAH #NAME?
JUMLAH A + B #NAME?
Analisa_147 - 358

6.25 1 m2 Pasang bekisting untuk dinding


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.660 100,000.00 66,000.00
2. Tukang Kayu Hari/Orang 0.330 120,000.00 39,600.00
3. Kepala Tukang Hari/Orang 0.033 -
4. Mandor Hari/Orang 0.033 -
JUMLAH 105,600.00

B. BAHAN
1. Kayu kelas III m3 0.030 2,800,000.00 84,000.00
2. Paku 5 cm - 12 cm Kg 0.400 22,000.00 8,800.00
3. Minyak bekisting Ltr 0.200 - -
4. Balok kayu Kls. II m3 0.020 2,800,000.00 56,000.00
5. Plywood tebal 9 mm Lmbr 0.350 110,000.00 38,500.00
6. Dolken kayu galam, Φ (8-10) cm, p = 4 m Btg 3.000 #NAME? #NAME?
7. Formtie/penjaga jrk bekisting/spacer Buah 4.000 - -
JUMLAH #NAME?
JUMLAH A + B #NAME?

SNI 6897:2008
ANALISA BIAYA KONSTRUKSI PEKERJAAN DINDING

6.7 Memasang 1 m2 dinding bata merah, tebal 1/2 bata, campuran spesi 1 PC : 2 PP
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.300 100,000.00 30,000.00
2. Tukang Batu Hari/Orang 0.100 120,000.00 12,000.00
3. Kepala Tukang Hari/Orang 0.010 -
4. Mandor Hari/Orang 0.015 -
JUMLAH 42,000.00

B. BAHAN
1. Bata merah Bh 70.000 1,000.00 70,000.00
2. Semen Portland Kg 18.950 1,340.00 25,393.00
3. Pasir pasang m3 0.038 242,000.00 9,196.00
JUMLAH 104,589.00
JUMLAH A + B 146,589.00

6.8 Memasang 1 m2 dinding bata merah, tebal 1/2 bata, campuran spesi 1 PC : 3 PP
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.300 100,000.00 30,000.00
2. Tukang Batu Hari/Orang 0.100 120,000.00 12,000.00
3. Kepala Tukang Hari/Orang 0.010 -
4. Mandor Hari/Orang 0.015 -
JUMLAH 42,000.00

B. BAHAN
1. Bata merah 5 x 11 x 22 cm Bh 70.000 1,000.00 70,000.00
2. Semen Portland Kg 14.370 1,340.00 19,255.80
3. Pasir pasang m3 0.040 242,000.00 9,680.00
JUMLAH 98,935.80
JUMLAH A + B 140,935.80

6.9 Memasang 1 m2 dinding bata merah, tebal 1/2 bata, campuran spesi 1 PC : 4 PP
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )
Analisa_148 - 358

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.300 100,000.00 30,000.00
2. Tukang Batu Hari/Orang 0.100 120,000.00 12,000.00
3. Kepala Tukang Hari/Orang 0.010 -
4. Mandor Hari/Orang 0.015 -
JUMLAH 42,000.00

B. BAHAN
1. Bata merah 5 x 11 x 22 cm Bh 70.000 1,000.00 70,000.00
2. Semen Portland Kg 11.500 1,340.00 15,410.00
3. Pasir pasang m3 0.043 242,000.00 10,406.00
JUMLAH 95,816.00
JUMLAH A + B 137,816.00
Analisa_149 - 358

6.22 Memasang 1 m2 dinding terawang (roaster) ukuran (12 x 11 x 24) cm, campuran spesi 1 PC :4 PP
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.300 100,000.00 30,000.00
2. Tukang Batu Hari/Orang 0.100 120,000.00 12,000.00
3. Kepala Tukang Hari/Orang 0.010 - -
4. Mandor Hari/Orang 0.015 - -
JUMLAH 42,000.00

B. BAHAN
1. Roaster / terawang Bh 30.000 40,000.00 1,200,000.00
2. Semen Portland Kg 11.000 1,340.00 14,740.00
3. Pasir pasang m3 0.035 242,000.00 8,470.00
JUMLAH 1,223,210.00
JUMLAH A + B 1,265,210.00

SNI 2837:2008
ANALISA BIAYA KONSTRUKSI PEKERJAAN PLESTERAN

6.13 Membuat 1 m2 plesteran 1 PC : 2 PP, tebal 20 mm


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.400 100,000.00 40,000.00
2. Tukang Batu Hari/Orang 0.200 120,000.00 24,000.00
3. Kepala Tukang Hari/Orang 0.020 -
4. Mandor Hari/Orang 0.022 -
JUMLAH 64,000.00

B. BAHAN
1. Semen Portland Kg 13.632 1,340.00 18,266.88
2. Pasir pasang m3 0.027 242,000.00 6,534.00
JUMLAH 24,800.88
JUMLAH A + B 88,800.88

6.15 Membuat 1 m2 plesteran 1 PC : 4 PP, tebal 20 mm


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.400 100,000.00 40,000.00
2. Tukang Batu Hari/Orang 0.200 120,000.00 24,000.00
3. Kepala Tukang Hari/Orang 0.020 -
4. Mandor Hari/Orang 0.022 -
JUMLAH 64,000.00

B. BAHAN
1. Semen Portland Kg 8.320 1,340.00 11,148.80
2. Pasir pasang m3 0.032 242,000.00 7,744.00
JUMLAH 18,892.80
JUMLAH A + B 82,892.80

6.27 Membuat 1 m2 acian


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
Pekerja Hari/Orang 0.200 100,000.00 20,000.00
Tukang Batu Hari/Orang 0.100 120,000.00 12,000.00
Kepala Tukang Batu Hari/Orang 0.010
Mandor Hari/Orang 0.010
Analisa_150 - 358

JUMLAH 32,000.00

B. BAHAN
Semen Portland Kg 3.250 1,340.00 4,355.00
JUMLAH 4,355.00
JUMLAH A + B 36,355.00
Analisa_151 - 358

SNI 2837:2008
ANALISA BIAYA KONSTRUKSI PEKERJAAN LANTAI

6.36 Memasang 1 m2 lantai keramik ukuran (20 x 20) cm


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.700 100,000.00 70,000.00
2. Tukang Batu Hari/Orang 0.350 120,000.00 42,000.00
3. Kepala Tukang Hari/Orang 0.035 -
4. Mandor Hari/Orang 0.035 -
JUMLAH 112,000.00

B. BAHAN
1. Ubin keramik 20 x 20 cm Buah 26.500 - -
2. Semen Portland Kg 10.400 1,340.00 13,936.00
3. Pasir pasang M3 0.045 242,000.00 10,890.00
4. Semen warna Kg 1.620 - -
JUMLAH 24,826.00
JUMLAH A + B 136,826.00

SNI 3434:2008
ANALISA BIAYA KONSTRUKSI PEKERJAAN KAYU

6.2 Membuat dan memasang 1 m3 kusen pintu dan kusen jendela, kayu kelas II atau III
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 6.000 100,000.00 600,000.00
2. Tukang Kayu Hari/Orang 18.000 120,000.00 2,160,000.00
3. Kepala Tukang Hari/Orang 2.000 -
4. Mandor Hari/Orang 0.300 -
JUMLAH 2,760,000.00

B. BAHAN
1. Kayu balok kelas II m3 1.200 3,682,000.00 4,418,400.00
JUMLAH 4,418,400.00
JUMLAH A + B 7,178,400.00

6.5 Membuat dan memasangn 1 m2 daun pintu panel, kayu kelas I atau II
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 1.000 100,000.00 100,000.00
2. Tukang Kayu Hari/Orang 3.000 120,000.00 360,000.00
3. Kepala Tukang Hari/Orang 0.300 -
4. Mandor Hari/Orang 0.050 -
JUMLAH 460,000.00

B. BAHAN
1. Papan Kayu m3 0.040 1,902,000.00 76,080.00
2. Lem Kayu Kg 0.500 75,000.00 37,500.00
JUMLAH 113,580.00
JUMLAH A + B 573,580.00
Analisa_152 - 358

6.12 Memasang 1 m2 teakwood rangkap lapis formika, rangka expose kayu kelas II
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.850 100,000.00 85,000.00
2. Tukang Kayu Hari/Orang 0.550 120,000.00 66,000.00
3. Kepala Tukang Hari/Orang 0.255 -
4. Mandor Hari/Orang 0.043 -
JUMLAH 151,000.00

B. BAHAN
1. Papan kayu m² 0.025 1,902,000.00 47,550.00
2. Paku 1 cm - 2,5 cm Kg 0.030 22,000.00 660.00
3. Lem kayu Kg 0.800 75,000.00 60,000.00
4. Teakwood tebal 4 mm ukuran (90 x 220) cm Lmbr 1.000 67,000.00 67,000.00
JUMLAH 175,210.00
JUMLAH A + B 326,210.00

6.13 Memasang 1 m3 konstruksi kuda-kuda konvensional


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 4.000 100,000.00 400,000.00
2. Tukang Kayu Hari/Orang 12.000 120,000.00 1,440,000.00
3. Kepala Tukang Hari/Orang 1.200 -
4. Mandor Hari/Orang 0.200 -
JUMLAH 1,840,000.00

B. BAHAN
1. Kayu balok kelas II m3 1.100 2,800,000.00 3,080,000.00
2. Besi strip tebal 5 mm Kg 15.000 10,000.00 150,000.00
3. Paku 12 cm Kg 5.600 22,000.00 123,200.00
JUMLAH 3,353,200.00
JUMLAH A + B 5,193,200.00

6.15 Memasang 1 m3 konstruksi gordeng, kayu kelas II


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 2.400 100,000.00 240,000.00
2. Tukang Kayu Hari/Orang 7.200 120,000.00 864,000.00
3. Kepala Tukang Hari/Orang 0.720 -
4. Mandor Hari/Orang 0.120 -
JUMLAH 1,104,000.00

B. BAHAN
1. Balok kayu m3 1.100 2,800,000.00 3,080,000.00
2. Besi strip tebal 5 mm Kg 15.000 10,000.00 150,000.00
3. Paku 12 cm Kg 3.000 22,000.00 66,000.00
JUMLAH 3,296,000.00
JUMLAH A + B 4,400,000.00

6.20 Memasang 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II atau III
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.200 100,000.00 20,000.00
2. Tukang Kayu Hari/Orang 0.300 120,000.00 36,000.00
3. Kepala Tukang Hari/Orang 0.030 -
4. Mandor Hari/Orang 0.010 -
JUMLAH 56,000.00
Analisa_153 - 358

B. BAHAN
1. Kaso-kaso (5 x 7) cm m3 0.016 2,800,000.00 45,640.00
2. Paku 7 cm - 10 cm Kg 0.250 22,000.00 5,500.00
JUMLAH 51,140.00
JUMLAH A + B 107,140.00
Analisa_154 - 358

6.21 1 m' Pasang lisplank ukuran ( 3 x 20 ) cm, kayu papan kelas II


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.100 100,000.00 10,000.00
2. Tukang Kayu Hari/Orang 0.200 120,000.00 24,000.00
3. Kepala Tukang Hari/Orang 0.020 -
4. Mandor Hari/Orang 0.005 -
JUMLAH 34,000.00

B. BAHAN
1. Papan kayu m3 0.0108 1,902,000.00 20,541.60
2. Paku 7 cm - 10 cm Kg 0.100 22,000.00 2,200.00
JUMLAH 22,741.60
JUMLAH A + B 56,741.60

5. Pasang 1 buah engsel pintu


NO. HARGA SATUAN BIAYA SATUAN
URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.015 100,000.00 1,500.00
2. Tukang Kayu Hari/Orang 0.150 120,000.00 18,000.00
3. Kepala Tukang Hari/Orang 0.015 -
4. Mandor Hari/Orang 0.001 -
JUMLAH 19,500.00

B. BAHAN
1. Engsel pintu Buah 1.000 39,000.00 39,000.00
JUMLAH 39,000.00
JUMLAH A + B 58,500.00

6. Pasang 1 buah engsel jendela


NO. HARGA SATUAN BIAYA SATUAN
URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.010 100,000.00 1,000.00
2. Tukang Kayu Hari/Orang 0.100 120,000.00 12,000.00
3. Kepala Tukang Hari/Orang 0.010 -
4. Mandor Hari/Orang 0.001 -
JUMLAH 13,000.00

B. BAHAN
1. Engsel jendela Buah 1.000 39,000.00 39,000.00
JUMLAH 39,000.00
JUMLAH A + B 52,000.00

2. Pasang 1 buah kunci tanam biasa


NO. HARGA SATUAN BIAYA SATUAN
URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.010 100,000.00 1,000.00
2. Tukang Kayu Hari/Orang 0.500 120,000.00 60,000.00
3. Kepala Tukang Hari/Orang 0.010 -
4. Mandor Hari/Orang 0.005 -
JUMLAH 61,000.00

B. BAHAN
1. Kunci Pintu Buah 1.000 223,000.00 223,000.00
JUMLAH 223,000.00
JUMLAH A + B 284,000.00
Analisa_155 - 358

RSNI T-12-2002
ANALISA BIAYA KONSTRUKSI PEKERJAAN SANITASI

31. 1 m2 pasang pintu fiber


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Tukang Hari/Orang 1.050 100,000.00 105,000.00
2. Pekerja Hari/Orang 1.050 120,000.00 126,000.00
3. Kepala Tukang Hari/Orang 0.105 -
4. Mandor Hari/Orang 0.0052 -
JUMLAH 231,000.00

B. BAHAN
1. Pintu Fiber m² 1.000 400,000.00 400,000.00
JUMLAH 400,000.00
JUMLAH A + B 631,000.00

SNI DT-03-3436-2002
ANALISA BIAYA KONSTRUKSI PEKERJAAN PENUTUP ATAP

16. 1 m2 Pasang penutup atap seng gelombang


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.120 100,000.00 12,000.00
2. Tukang Kayu Hari/Orang 0.060 120,000.00 7,200.00
3. Kepala Tukang Hari/Orang 0.006 -
4. Mandor Hari/Orang 0.006 -
JUMLAH 19,200.00

B. BAHAN
1. Seng gelombang (180 x 90 cm) Lmbr 0.700 53,000.00 37,100.00
2. Paku seng Bh 0.020 22,000.00 440.00
JUMLAH 37,540.00
JUMLAH A + B 56,740.00

SNI 03-2842-2002
ANALISA BIAYA KONSTRUKSI PEKERJAAN PENGECATAN

6.14 1 m2 pengecatan tembok baru ( 1 Lapis Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup )
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.0200 100,000.00 2,000.00
2. Tukang Cat Hari/Orang 0.0630 120,000.00 7,560.00
3. Kepala Tukang Hari/Orang 0.0063 -
4. Mandor Hari/Orang 0.0025 -
JUMLAH 9,560.00

B. BAHAN
1. Plamir tembok Kg 0.100 9,000.00 900.00
2. Cat dasar Kg 0.100 105,000.00 10,500.00
3. Cat tembok mutu menengah Kg 0.260 105,000.00 27,300.00
JUMLAH 11,400.00
JUMLAH A + B 20,960.00

6.15 1 m2 pengecatan tembok Lama ( 1 Lapis Cat Dasar, 2 Lapis Cat Penutup )
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
Analisa_156 - 358

1. Pekerja Hari/Orang 0.0280 100,000.00 2,800.00


2. Tukang Cat Hari/Orang 0.0420 120,000.00 5,040.00
3. Kepala Tukang Hari/Orang 0.0042 -
4. Mandor Hari/Orang 0.0025 -
JUMLAH 7,840.00

B. BAHAN
1. Cat dasar Kg 0.100 105,000.00 10,500.00
2. Cat tembok mutu menengah Kg 0.180 105,000.00 18,900.00
JUMLAH 10,500.00
JUMLAH A + B 18,340.00
Analisa_157 - 358

6.8 1 m2 pengecatan bidang kayu baru ( 1 lapis plamur , 1 lapis cat dasar dan 2 lapis cat penutup)
NO. HARGA SATUAN BIAYA SATUAN
URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.070 100,000.00 7,000.00
2. Tukang Cat Hari/Orang 0.009 120,000.00 1,080.00
3. Kepala Tukang Hari/Orang 0.006 - -
4. Mandor Hari/Orang 0.003 -
JUMLAH 8,080.00

B. BAHAN
1. Meni kayu Kg 0.200 47,000.00 9,400.00
2. Plamir kayu Kg 0.150 9,000.00 1,350.00
3. Cat dasar kayu Kg 0.170 58,000.00 9,860.00
4. Cat kayu mutu menengah Kg 0.260 58,000.00 15,080.00
JUMLAH 15,080.00
JUMLAH A + B 23,160.00

SNI-T-15-2002
ANALISA BIAYA KONSTRUKSI PEKERJAAN SANITASI

6.2 Memasang 1 buah kloset jongkok porselen


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 1.000 100,000.00 100,000.00
2. Tukang Batu Hari/Orang 1.500 120,000.00 180,000.00
3. Kepala Tukang Hari/Orang 0.150 -
4. Mandor Hari/Orang 0.160 -
JUMLAH 280,000.00

B. BAHAN
1. Kloset jongkok Buah 1.000 - -
2. Sement portland Kg 6.000 1,340.00 8,040.00
3. Pasir pasang M3 0.010 242,000.00 2,420.00
JUMLAH 10,460.00
JUMLAH A + B 290,460.00

6.19 Memasang 1 m' Pipa Galvanis diameter 1/2"


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.054 100,000.00 5,400.00
2. Tukang Hari/Orang 0.090 120,000.00 10,800.00
3. Kepala Tukang Hari/Orang 0.009 -
4. Mandor Hari/Orang 0.003 -
JUMLAH 16,200.00

B. BAHAN
1. Pipa Galvanis M' 1.200 - -
2. Perlengkapan 35 % harga pipa Ls 0.35 - -
JUMLAH -
JUMLAH A + B 16,200.00

6.20 Memasang 1 m' Pipa Galvanis diameter 3/4"


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.054 100,000.00 5,400.00
2. Tukang Hari/Orang 0.090 120,000.00 10,800.00
Analisa_158 - 358

3. Kepala Tukang Hari/Orang 0.009 -


4. Mandor Hari/Orang 0.003 -
JUMLAH 16,200.00

B. BAHAN
1. Pipa Galvanis M' 1.200 - -
2. Perlengkapan 35 % harga pipa Ls 0.35 - -
JUMLAH -
JUMLAH A + B 16,200.00
Analisa_159 - 358

6.21 Memasang 1 m' Pipa Galvanis diameter 1"


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.054 100,000.00 5,400.00
2. Tukang Batu Hari/Orang 0.090 120,000.00 10,800.00
3. Kepala Tukang Hari/Orang 0.009 -
4. Mandor Hari/Orang 0.003 -
JUMLAH 16,200.00

B. BAHAN
1. Pipa Galvanis M' 1.200 - -
2. Perlengkapan 35 % harga pipa Ls 0.350 - -
JUMLAH -
JUMLAH A + B 16,200.00

6.22 Memasang 1 m' Pipa Galvanis diameter 11/2"


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.108 100,000.00 10,800.00
2. Tukang Batu Hari/Orang 0.180 120,000.00 21,600.00
3. Kepala Tukang Hari/Orang 0.018 -
4. Mandor Hari/Orang 0.0054 -
JUMLAH 32,400.00

B. BAHAN
1. Pipa Galvanis M' 1.200 - -
2. Perlengkapan 35 % harga pipa Ls 0.350 - -
JUMLAH -
JUMLAH A + B 32,400.00

6.23 Memasang 1 m' Pipa Galvanis diameter 3"


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.108 100,000.00 10,800.00
2. Tukang Batu Hari/Orang 0.180 120,000.00 21,600.00
3. Kepala Tukang Hari/Orang 0.0180 -
4. Mandor Hari/Orang 0.0054 -
JUMLAH 32,400.00

B. BAHAN
1. Pipa Galvanis M' 1.200 - -
2. Perlengkapan 35 % harga pipa Ls 0.350 - -
JUMLAH -
JUMLAH A + B 32,400.00

6.24 Memasang 1 m' Pipa Galvanis diameter 4"


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.081 100,000.00 8,100.00
2. Tukang Batu Hari/Orang 0.135 120,000.00 16,200.00
3. Kepala Tukang Hari/Orang 0.0135 -
4. Mandor Hari/Orang 0.0041 -
JUMLAH 24,300.00

B. BAHAN
1. Pipa Galvanis M' 1.200 - -
Analisa_160 - 358

2. Perlengkapan 35 % harga pipa Ls 0.350 -


JUMLAH -
JUMLAH A + B 24,300.00
Analisa_161 - 358

6.25 Memasang 1 m' Pipa PVC tipe AW diameter 1/2"


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.036 100,000.00 3,600.00
2. Tukang Batu Hari/Orang 0.060 120,000.00 7,200.00
3. Kepala Tukang Hari/Orang 0.006 -
4. Mandor Hari/Orang 0.002 -
JUMLAH 10,800.00

B. BAHAN
1. Pipa PVC M' 1.200 - -
2. Perlengkapan 35 % harga pipa Ls 0.350 - -
JUMLAH -
JUMLAH A + B 10,800.00

6.26 Memasang 1 m' Pipa PVC tipe AW diameter 3/4"


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.036 100,000.00 3,600.00
2. Tukang Batu Hari/Orang 0.060 120,000.00 7,200.00
3. Kepala Tukang Hari/Orang 0.006 -
4. Mandor Hari/Orang 0.002 -
JUMLAH 10,800.00

B. BAHAN
1. Pipa PVC M' 1.200 - -
2. Perlengkapan 35 % harga pipa Ls 0.350 - -
JUMLAH -
JUMLAH A + B 10,800.00

6.27 Memasang 1 m' Pipa PVC tipe AW diameter 1"


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.036 100,000.00 3,600.00
2. Tukang Batu Hari/Orang 0.060 120,000.00 7,200.00
3. Kepala Tukang Hari/Orang 0.006 -
4. Mandor Hari/Orang 0.002 -
JUMLAH 10,800.00

B. BAHAN
1. Pipa PVC M' 1.200 - -
2. Perlengkapan 35 % harga pipa Ls 0.350 - -
JUMLAH -
JUMLAH A + B 10,800.00

6.28 Memasang 1 m' Pipa PVC tipe AW diameter 11/2"


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.036 100,000.00 3,600.00
2. Tukang Batu Hari/Orang 0.060 120,000.00 7,200.00
3. Kepala Tukang Hari/Orang 0.006 -
4. Mandor Hari/Orang 0.002 -
JUMLAH 10,800.00

B. BAHAN
1. Pipa PVC M' 1.200 - -
Analisa_162 - 358

2. Perlengkapan 35 % harga pipa Ls 0.350 - -


JUMLAH -
JUMLAH A + B 10,800.00
Analisa_163 - 358

6.29 Memasang 1 m' Pipa PVC tipe AW diameter 2"


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.054 100,000.00 5,400.00
2. Tukang Batu Hari/Orang 0.090 120,000.00 10,800.00
3. Kepala Tukang Hari/Orang 0.009 -
4. Mandor Hari/Orang 0.0027 -
JUMLAH 16,200.00

B. BAHAN
1. Pipa PVC M' 1.200 - -
2. Perlengkapan 35 % harga pipa Ls 0.350 - -
JUMLAH -
JUMLAH A + B 16,200.00

6.31 Memasang 1 m' Pipa PVC tipe AW diameter 3"


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.081 100,000.00 8,100.00
2. Tukang Batu Hari/Orang 0.135 120,000.00 16,200.00
3. Kepala Tukang Hari/Orang 0.135 -
4. Mandor Hari/Orang 0.0041 -
JUMLAH 24,300.00

B. BAHAN
1. Pipa PVC M' 1.200 0 -
2. Perlengkapan 35 % harga pipa Ls 0.350 -
JUMLAH -
JUMLAH A + B 24,300.00

6.32 Memasang 1 m' Pipa PVC tipe AW diameter 4"


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.081 100,000.00 8,100.00
2. Tukang Batu Hari/Orang 0.135 120,000.00 16,200.00
3. Kepala Tukang Hari/Orang 0.135 -
4. Mandor Hari/Orang 0.0041 -
JUMLAH 24,300.00

B. BAHAN
1. Pipa PVC M' 1.200 0 -
2. Perlengkapan 35 % harga pipa Ls 0.350 -
JUMLAH -
JUMLAH A + B 24,300.00

6.35 Memasang 1 buah kran diameter /4" atau /2"


3 1

HARGA SATUAN BIAYA SATUAN


NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang - 100,000.00 -
2. Tukang Batu Hari/Orang 0.100 120,000.00 12,000.00
3. Kepala Tukang Hari/Orang 0.010 -
4. Mandor Hari/Orang - -
JUMLAH 12,000.00

B. BAHAN
1. Kran air Buah 1.000 - -
2. Seal tape Buah 0.025 5,500.00 137.50
Analisa_164 - 358

JUMLAH 137.50
JUMLAH A + B 12,137.50
Analisa_165 - 358

6.36 Memasang 1 buah floor drain


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang - 100,000.00 -
2. Tukang Batu Hari/Orang 0.100 120,000.00 12,000.00
3. Kepala Tukang Hari/Orang 0.010 -
4. Mandor Hari/Orang - -
JUMLAH 12,000.00

B. BAHAN
1. Floor drain Buah 1.000 - -
JUMLAH -
JUMLAH A + B 12,000.00

SNI 7393 : 2008


ANALISA BIAYA KONSTRUKSI PEKERJAAN BESI DAN ALUMINIUM
1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
6.4
NO. URAIAN HARGA SATUAN BIAYA SATUAN
SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 1.050 100,000.00 105,000.00
2. Tukang Las Hari/Orang 1.050 120,000.00 126,000.00
3. Kepala Tukang Hari/Orang 0.105 -
4. Mandor Hari/Orang 0.052 -
JUMLAH 231,000.00

B. BAHAN
1. Besi siku 30.30.3 Kg 15.000 100,000.00 1,500,000.00
1. Besi plat baja Kg 32.800 - -
2. Kawat las Kg 0.050 - -
JUMLAH 1,500,000.00
JUMLAH A + B 1,731,000.00
Galian Urugan Tanah
Volume Vol.
Dia. Luar Dlm. Gali Vol. Pasir
Dia. Pipa Lbr. Gali (m) Dia. Pipa Galian
Pipa (m) (m) (m³) (m³/m)
(m³/m)
3" 0.090 0.300 0.600 0.180 3" 0.180 0.039
2" 0.063 0.300 0.500 0.150 2" 0.150 0.036
1 1/2" 0.050 0.300 0.400 0.120 1 1/2" 0.120 0.034
1 1/4" 0.040 0.300 0.400 0.120 1 1/4" 0.120 0.029
1" 0.032 0.300 0.400 0.120 1" 0.120 0.029

Urugan Pasir
Vol. Pipa vol. Galian Tinggi Psr. Volume
Dia. Pipa
(m³/m) (m³/m) (m) (m³) π r² Vol. Pipa (m³/m)

3" 0.006 0.180 0.150 0.039 3.14 0.0020 0.0064


2" 0.003 0.150 0.130 0.036 3.14 0.0010 0.0031
1 1/2" 0.002 0.120 0.120 0.034 3.14 0.0006 0.0020
1 1/4" 0.001 0.120 0.100 0.029 3.14 0.0004 0.0013
1" 0.001 0.120 0.100 0.029 3.14 0.0003 0.0008

DIAMETER PIPA GALIAN URUGAN TANAH URUGAN PASIR


Ø Luas Pjg Volume Luas Pjg Volume Luas Pjg
1.65 1.633
3 0.180 0 0.00 0.141 0 0.00 0.039 0
2 0.150 564 84.60 0.114 564 105.10 0.036 564
11/2 0.120 18 2.16 0.086 18 1.55 0.034 18
11/4 0.120 0 0.00 0.091 0 0.00 0.029 0
1 0.120 0 0.00 0.091 0 0.00 0.029 0
TOTAL 582 86.760 TOTAL 582.000 106.65 TOTAL 582.000

DIAMETER PIPA GALIAN URUGAN TANAH URUGAN PASIR


Ø Luas Pjg Volume Luas Pjg Volume Luas Pjg
0.84 0.85
3 0.180 0 0.00 0.141 0 0.00 0.039 0
2 0.150 106 13.36 0.114 106 10.28 0.036 106
11/2 0.120 1,488 149.99 0.086 1,488 108.73 0.034 1,488
11/4 0.120 0 0.00 0.091 0 0.00 0.029 0
1 0.120 0 0.00 0.091 0 0.00 0.029 0
Total 1,594 163.35 Total 1,594 119.01 Total 1,594

DIAMETER PIPA GALIAN URUGAN TANAH URUGAN PASIR


Ø Luas Pjg Volume Luas Pjg Volume Luas Pjg
0.6 0.6
3 0.180 0 0.00 0.141 0 0.00 0.039 0
2 0.150 636 57.24 0.114 636 72.58 0.036 636
11/2 0.120 0 0.00 0.086 0 0.00 0.034 0
11/4 0.120 0 0.00 0.091 0 0.00 0.029 0
1 0.120 0 0.00 0.091 0 0.00 0.029 0
Total 636 57.24 Total 636 72.58 Total 636

DIAMETER PIPA GALIAN URUGAN TANAH URUGAN PASIR


Ø Luas Pjg Volume Luas Pjg Volume Luas Pjg
3 0.250 32 7.99 0.212 32 6.78 0.039 32
2 0.204 135 27.59 0.180 135 24.35 0.036 135
11/2 0.158 159 25.04 0.139 159 22.15 0.035 159
11/4 0.150 504 75.40 0.136 504 68.33 0.034 504
1 0.143 0 0.00 0.133 0 0.00 0.033 0
TOTAL 41.5 136.018 TOTAL 41.500 121.61 TOTAL 41.500
Dia.
Vol.
Dalam
timbunan
S 12,5
(m³) (mm) Ø
0.141 3" 83.00 0.083 3
0.114 2" 58.20 0.0582 2
0.086 1 1/2" 45.20 0.0452 11/2
0.091 1 1/4" 36.20 0.0362 11/4
0.091 1" 28.20 0.0282 1

Vol. Pipa (m³/m) r² Vol/m m³/btg

3 0.0017 0.005 0.032


2 0.0008 0.003 0.016
1 1/2 0.0005 0.002 0.010
1 1/4 0.0003 0.001 0.006
1 0.0002 0.001 0.004

URUGAN PASIR 2017


Volume 1
1 -
0.00
20.24 total 167,500,000
0.61 in kind 5,913,000
0.00 blm (5,913,000)
0.00
20.85 231 34.615385

URUGAN PASIR APBDES 240 20,887,000


Volume 144
1644
0.00 35000000
3.80 10489694.28
50.65
0.00
0.00
54.45

URUGAN PASIR APBDES 2 240


Volume 144
1644
0.00 0
22.82 0
0.00
0.00
0.00
22.82

URUGAN PASIR 2011 32 0.204 6.540


Volume 135 0.158 21.263
1.25 159 0.150 23.7864
4.90 504 0.143 72.285696
5.57 123.874
17.14
0.00
28.85 830
42
RENCANA ANGGARAN BIAYA APBDES
0
Nomor RAB : 01 Sub pekerjaan/Kegiatan : Pengadaan Pipa PVC
Pekerjaan Kegiatan : Sarana Air Minum Dimensi : 230 Batang

Volume Harga Biaya (Rp)


URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBDES Total APBDES
inCash inKind Rp inCash inKind
1 2=3+4+5 3 4 5 6 7 8=2x7 9=3x7 10=4x7 11=5x7
A. BAHAN
1.1 Pipa GIP Medium A Super (6 m)
- Pipa GIP Ø 3" - - - - Btg 1,200,000 - - - -
- Pipa GIP Ø 2" - - - - Btg 720,000 - - - -
- Pipa GIP Ø 1 1/2" - - - - Btg 527,000 - - - -
- Pipa GIP Ø 1 1/4" - - - - Btg 227,000 - - - -
1.2 Pipa PVC SNI
- Pipa PVC S-12.5 Ø 3" - (6m) - - - - Btg 265,000 - - - -
- Pipa PVC S-12.5 Ø 2" - (6m) 106 - - 106 Btg 120,000 12,720,000 - - 12,720,000
- Pipa PVC S-12,5 Ø 1 1/2" - (6m) 124 - - 124 Btg 95,000 11,780,000 - - 11,780,000

Sub Total 24,500,000 - - 24,500,000


B. BIAYA MOBILISASI
2.1 Biaya Mobilisasi Pipa dan Aksesoris
- Biaya Mobilisasi dari Makassar Ke Desa 1 - - 1 Paket - - - - -
Sub Total - - - -
Jumlah 24,500,000 - - 24,500,000
Dibulatkan 24,500,000 - - 24,500,000
11,000.00 Alelebbae, Desember 2019

Disetujui Oleh : Dibuat Oleh :


Ketua DPMU Kabupaten Wajo KKM "ALELEBBAE" Fasilitator Masyarakat Pelaksana Pamsimas

( MUH. TAUFIQ, ST ) (UNU) (GULBUDIN HEMATIAR, ST ) ( SAHARUDDIN )


NIP : 19750717 2009 02 1003 Koordinator FM - WSS Ketua SATLAK
RENCANA ANGGARAN BIAYA APBDES
Provinsi/Kabupaten-Kota/Kecamatan/Desa : Sulawesi Selatan/Wajo/Pitumpanua/Alelebbae
Nomor RAB : 02 Sub pekerjaan/Kegiatan : Pemasangan Pipa
Pekerjaan Kegiatan : Sarana Air Minum Dimensi : 1,380 m

Volume Harga Biaya (Rp)


URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBDES Total APBDES
inCash inKind Rp inCash inKind
1 2=3+4+5 3 4 5 6 7 8=2x7 9=3x7 10=4x7 11=5x7

A. PEKERJAAN TANAH
1.1. Galian Tanah
- Pekerja 57.240 - 57.240 Hok 100,000 5,724,000 5,724,000
1.2. Urugan Kembali
- Pekerja 24.193 - 24.193 Hok 100,000 2,419,312 2,419,312

B. PEMASANGAN PIPA
2.1 Pipa PVC Ø3"
- Pekerja - - - Hok 100,000 - - -
2.2 Pipa PVC Ø 2"
- Pekerja 23.464 - 23.464 Hok 100,000 2,346,382 2,346,382
2.3 Pipa PVC Ø 1 1/5"
- Pekerja - - - Hok 100,000 - -

Sub Total 10,489,694 - - 10,489,694


Dibulatkan 10,490,000 - - 10,489,000
Palippu, Juni 2020
Disetujui Oleh : Didampingi oleh : Dibuat Oleh :
Ketua DPMU Kabupaten Wajo KKM "PUNCAK" Fasilitator Masyarakat Pelaksana Pamsimas

( MUH. TAUFIQ, ST ) (UNU) (GULBUDIN HEMATIAR, ST ) ( MUH. YAHYA)


NIP : 19750717 2009 02 1003 Koordinator FM - WSS Ketua SATLAK
RENCANA ANGGARAN BIAYA
Provinsi/Kabupaten-Kota/Kecamatan/Desa : Sulawesi Selatan/Wajo/Pitumpanua/Alelebbae
Nomor RAB : 05 Sub pekerjaan/Kegiatan : Reservoir & Gardu Listrik
Pekerjaan Kegiatan : Sarana Air Minum Ukuran/Dimensi : 3,3 x 3,3 x 2,0 m
Kapasitas : 20 m³
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5 3 4 5 6 7 8=2x7 9=3x7 10=4x7 11=5x7
1 BAHAN
A. PEKERJAAN PENDAHULUAN
1.1 Pemasangan Bowplank
- Kayu klas III uk. 5/5 0.120 0.120 - M³ 2,800,000 336,000 - 336,000 -
- Paku biasa 2" - 5" 0.040 0.040 Kg 22,000 880 - 880 -
- Kayu papan kls. 3/20 0.014 0.014 - M³ 45,000 630 - 630 -
B. PEKERJAAN TANAH
2.1 Urugan Pasir
- Pasir urug 1.469 1.469 M³ 242,000 355,450 - - 355,450
C. PEKERJAAN BETON
3.1 Lantai Kerja t. 5 cm
- Semen Portland 140.760 140.760 M³ 1,340 188,618 - - 188,618
- Pasir beton 0.390 0.390 M³ 306,000 119,453 - - 119,453
- Batu pecah 2/3 cm 0.466 0.466 M³ 591,000 275,154 - - 275,154
3.2 Rabat Beton Lantai Dasar 10 cm
- Semen Portland 62.618 62.618 M³ 1,340 83,907 - - 83,907
- Pasir beton 0.174 0.174 M³ 306,000 53,139 - - 53,139
- Batu pecah 2/3 cm 0.207 0.207 M³ 591,000 122,403 - - 122,403
3.3 Pondasi Poor Plat 1,5 x 1,5
* Beton
- Semen portland 1,108.800 1,108.800 Kg 1,340 1,485,792 - - 1,485,792
- Pasir Beton 1.645 1.645 M³ 306,000 503,294 - - 503,294
- Batu pecah 2/3 cm 2.406 2.406 M³ 591,000 1,421,749 - - 1,421,749
* Pembesian
- Besi beton Polos Ø 14 552.671 552.671 Kg 15,840 8,754,423 - - 8,754,423
- Kawat beton 7.895 7.895 Kg 23,000 181,592 - - 181,592
* Bekisting
- Kayu kls. III 0.192 0.192 - M³ 2,800,000 537,600 - 537,600 -
- Paku biasa 2" - 5" 1.440 1.440 Kg 22,000 31,680 - - 31,680
3.4 Kolom 40x40 K1
* Beton
- Semen portland 2,027.520 2,027.520 Kg 1,340 2,716,877 - - 2,716,877
- Pasir Beton 3.008 3.008 M³ 306,000 920,308 - - 920,308
- Batu pecah 2/3 cm 4.399 4.399 M³ 591,000 2,599,770 - - 2,599,770
* Pembesian
- Besi beton Polos Ø 16 556.803 556.803 Kg 15,823 8,810,175 - - 8,810,175
- Besi beton Polos Ø 8 89.486 89.486 Kg 15,823 1,415,921 - - 1,415,921
- Kawat beton 9.233 9.233 Kg 23,000 212,352 - - 212,352
* Bekisting
- Kayu Kls. III - - - M³ 2,800,000 - - - -
- Paku biasa 2" - 5" 11.520 11.520 Kg 22,000 253,440 - - 253,440
- Balok Kayu Kls. III 0.432 0.432 M³ 2,800,000 1,209,600 - 1,209,600 -
- Tripleks 9 mm 10.080 10.080 Lbr 110,000 1,108,800 - - 1,108,800
- Bambu 23.040 23.040 Btg 31,000 714,240 - - 714,240
3.5 Kolom 20x20 K2
* Beton
- Semen portland 97.152 97.152 Kg 1,340 130,184 - - 130,184
- Pasir Beton 0.144 0.144 M³ 306,000 44,098 - - 44,098
- Batu pecah 2/3 cm 0.211 0.211 M³ 591,000 124,572 - 124,572
* Pembesian
- Besi beton Polos Ø 12 26.846 26.846 Kg 15,860 425,765 - - 425,765
- Besi beton Polos Ø 8 11.434 11.434 Kg 15,823 180,923 - - 180,923
- Kawat beton 0.547 0.547 Kg 23,000 12,578 - - 12,578
* Bekisting
- Kayu Kls. III - - - M³ 2,800,000 - - - -
- Paku biasa 2" - 5" 1.600 1.600 Kg 22,000 35,200 - - 35,200
- Balok Kayu Kls. III 0.060 0.060 - M³ 2,800,000 168,000 - 168,000 -
- Tripleks 9 mm 1.400 1.400 Lbr 110,000 154,000 - - 154,000
- Bambu 4.000 4.000 - Btg 31,000 124,000 - 124,000 -
3.6 Balok 20 x 40 (B2)
* Beton
- Semen portland 730.752 730.752 Kg 1,340 979,208 - - 979,208
- Pasir Beton 1.084 1.084 M³ 306,000 331,694 - - 331,694
- Batu pecah 2/3 cm 1.585 1.585 M³ 591,000 937,000 - - 937,000
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5 3 4 5 6 7 8=2x7 9=3x7 10=4x7 11=5x7
* Pembesian
- Besi beton Polos Ø 14 309.957 309.957 Kg 15,840 4,909,792 - - 4,909,792
- Besi beton Polos Ø 8 105.119 105.119 Kg 15,823 1,663,270 - - 1,663,270
- Kawat beton 5.930 5.930 Kg 23,000 136,382 - - 136,382
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5 3 4 5 6 7 8=2x7 9=3x7 10=4x7 11=5x7
* Bekisting
- Kayu Kls. III - - - M³ 2,800,000 - - - -
- Paku biasa 2" - 5" 4.152 - 4.152 Kg 22,000 91,344 - - 91,344
- Balok Kayu Kls. III 0.187 0.187 M³ 2,800,000 523,152 - 523,152 -
- Tripleks 9 mm 3.633 - 3.633 Lbr 110,000 399,630 - - 399,630
- Bambu 10.380 10.380 Btg 31,000 321,780 - - 321,780
3.7 Balok 25 x 40 ( B1 )
* Beton
- Semen portland 344.960 344.960 Kg 1,340 462,246 - - 462,246
- Pasir Beton 0.512 0.512 M³ 306,000 156,580 - - 156,580
- Batu pecah 2/3 cm 0.748 0.748 M³ 591,000 442,322 - - 442,322
* Pembesian
- Besi beton Polos Ø 14 125.670 125.670 Kg 15,840 1,990,647 - - 1,990,647
- Besi beton Polos Ø 8 42.534 42.534 Kg 15,823 672,999 - - 672,999
- Kawat beton 2.403 2.403 Kg 23,000 55,267 - - 55,267
* Bekisting
- Kayu Kls. III - - - M³ 2,800,000 - - - -
- Paku biasa 2" - 5" 2.240 2.240 Kg 22,000 49,280 - - 49,280
- Balok Kayu Kls. III 0.101 0.101 - M³ 2,800,000 282,240 - 282,240 -
- Tripleks 9 mm 1.960 1.960 Lbr 110,000 215,600 - - 215,600
- Bambu 5.600 5.600 - Btg 31,000 173,600 - 173,600 -
3.8 Sloef 20 x 40 ( S1 )
* Beton
- Semen portland 487.168 487.168 Kg 1,340 652,805 - - 652,805
- Pasir Beton 0.723 0.723 M³ 306,000 221,130 - - 221,130
- Batu pecah 2/3 cm 1.057 1.057 M³ 591,000 624,667 - - 624,667
* Pembesian
- Besi beton Polos Ø 14 177.118 177.118 Kg 15,840 2,805,596 - - 2,805,596
- Besi beton Polos Ø 8 52.559 52.559 Kg 15,823 831,635 - - 831,635
- Kawat beton 3.281 3.281 Kg 23,000 75,466 - - 75,466
* Bekisting
- Kayu Kls. III 0.311 0.311 M³ 2,800,000 871,920 - 871,920 -
- Paku biasa 2" - 5" 2.076 2.076 Kg 22,000 45,672 - - 45,672
3.9 Ringbalk 20 x 25 ( RB1 )
* Beton
- Semen portland 579.920 579.920 Kg 1,340 777,093 - - 777,093
- Pasir Beton 0.860 0.860 M³ 306,000 263,230 - - 263,230
- Batu pecah 2/3 cm 1.258 1.258 M³ 591,000 743,597 - - 743,597
* Pembesian
- Besi beton Polos Ø 12 123.230 123.230 Kg 15,860 1,954,379 - - 1,954,379
- Besi beton Polos Ø 8 40.952 40.952 Kg 15,823 647,981 - - 647,981
- Kawat beton 2.345 2.345 Kg 23,000 53,946 - - 53,946
* Bekisting
- Kayu Kls. III - - - M³ 2,800,000 - - - -
- Paku biasa 2" - 5" 2.197 2.197 Kg 22,000 48,327 - - 48,327
- Balok Kayu Kls. III 0.074 - 0.074 M³ 2,800,000 207,585 - - 207,585
- Tripleks 9 mm 1.922 1.922 Lbr 110,000 211,429 - - 211,429
- Bambu 10.983 10.983 - Btg 31,000 340,483 - 340,483 -
3.10 Plat Lantai t. 20 cm
* Beton
- Semen portland 766.656 766.656 Kg 1,340 1,027,319 - - 1,027,319
- Pasir Beton 1.137 1.137 M³ 306,000 347,992 - - 347,992
- Batu pecah 2/3 cm 1.663 1.663 M³ 591,000 983,038 - - 983,038
* Pembesian
- Besi beton Polos Ø 12 209.174 209.174 Kg 15,860 3,317,418 - - 3,317,418
- Kawat beton 2.988 2.988 Kg 23,000 68,729 - - 68,729
* Bekisting
- Kayu Kls. III - - - M³ 2,800,000 - - - -
- Paku biasa 2" - 5" 1.353 1.353 Kg 22,000 29,766 - - 29,766
- Balok Kayu Kls. III 0.051 0.051 M³ 2,800,000 142,065 - - 142,065
- Tripleks 9 mm 1.184 1.184 Lbr 110,000 130,226 - - 130,226
- Bambu 20.295 20.295 - Btg 31,000 629,145 - 629,145 -
3.11 Dinding Beton t. 20 cm
* Beton
- Semen portland 2,323.200 2,323.200 Kg 1,340 3,113,088 - - 3,113,088
- Pasir Beton 3.446 3.446 M³ 306,000 1,054,520 - - 1,054,520
- Batu pecah 2/3 cm 5.040 5.040 M³ 591,000 2,978,903 - - 2,978,903
* Pembesian
- Besi beton Polos Ø 12 636.844 636.844 Kg 15,860 10,100,090 - - 10,100,090
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5 3 4 5 6 7 8=2x7 9=3x7 10=4x7 11=5x7
- Kawat beton 9.098 9.098 Kg 23,000 209,249 - - 209,249
* Bekisting
- Kayu Kls. III - - - M³ 2,800,000 - - - -
- Paku biasa 2" - 5" 6.600 6.600 Kg 22,000 145,200 - - 145,200
- Balok Kayu Kls. III 0.330 0.330 - M³ 2,800,000 924,000 - 924,000 -
- Tripleks 9 mm 5.775 5.775 Lbr 110,000 635,250 - - 635,250
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5 3 4 5 6 7 8=2x7 9=3x7 10=4x7 11=5x7
- Bambu 49.500 49.500 Btg 31,000 1,534,500 - 1,534,500 -
3.12 Plat Atap t. 12 cm
* Beton
- Semen portland 689.990 689.990 Kg 1,340 924,587 - - 924,587
- Pasir Beton 1.024 1.024 M³ 306,000 313,192 - - 313,192
- Batu pecah 2/3 cm 1.497 1.497 M³ 591,000 884,734 - - 884,734
* Pembesian
- Besi beton Polos Ø 10 306.999 306.999 Kg 15,802 4,851,281 - - 4,851,281
- Kawat beton 4.386 4.386 Kg 23,000 100,871 - - 100,871
* Bekisting
- Kayu Kls. III - - - M³ 2,800,000 - - - -
- Paku biasa 2" - 5" 2.178 2.178 Kg 22,000 47,916 - - 47,916
- Balok Kayu Kls. III 0.082 0.082 M³ 2,800,000 228,690 - - 228,690
- Tripleks 9 mm 1.906 1.906 Lbr 110,000 209,633 - - 209,633
- Bambu 32.670 32.670 Btg 31,000 1,012,770 - 1,012,770 -
3.13 Balok Profil
* Beton
- Semen portland 517.834 517.834 Kg 1,340 693,898 - - 693,898
- Pasir Beton 0.768 0.768 M³ 306,000 235,049 - - 235,049
- Batu pecah 2/3 cm 1.123 1.123 M³ 591,000 663,988 - - 663,988
* Pembesian
- Besi beton Polos Ø 10 38.849 38.849 Kg 15,802 613,908 - - 613,908
- Kawat beton 0.555 0.555 Kg 23,000 12,765 - - 12,765
* Bekisting
- Kayu Kls. III - - - M³ 2,800,000 - - - -
- Paku biasa 2" - 5" 2.271 2.271 Kg 22,000 49,967 - - 49,967
- Balok Kayu Kls. III 0.082 0.082 M³ 2,800,000 228,938 - - 228,938
- Tripleks 9 mm 1.987 1.987 Lbr 110,000 218,604 - - 218,604
- Bambu 9.085 9.085 Btg 31,000 281,630 - - 281,630
D. PEKERJAAN DINDING
4.1 Pas.Batu Merah 1/2 (1:2)
- Bata merah 781.900 781.900 Bh 1,000 781,900 - - 781,900
- Semen Portland 128.455 128.455 Kg 1,340 172,130 - - 172,130
- Pasir pasang 0.480 0.480 m³ 242,000 116,235 - - 116,235
4.2. Pas. Rooster
- Rooster 6.000 6.000 Bh 40,000 240,000 - - 240,000
- Semen Portland 2.200 2.200 Kg 1,340 2,948 - - 2,948
- Pasir pasang 0.007 - 0.007 M³ 242,000 1,694 - - 1,694
E. PEKERJAAN PINTU
5.1 Pekerjaan Pintu dan Jendela
- Kusen Pintu 1.000 1.000 Bh 668,000 668,000 - - 668,000
- Kusen Jendela 1.000 1.000 Bh 200,000 200,000 - - 200,000
- Daun Pintu 1.000 1.000 Bh 757,000 757,000 - - 757,000
- Kaca 5mm 0.362 0.362 m2 125,000 45,238 - - 45,238
- Engsel Kupu kupu 3.000 3.000 Bh 39,000 117,000 - - 117,000
- Kunci Tanam 1.000 1.000 Bh 223,000 223,000 - - 223,000
5.2 Pengecatan Bidang Kayu baru
- Cat meni 1.232 1.232 Kg 47,000 57,904 - - 57,904
- Plamir Kayu 0.924 0.924 Kg 9,000 8,316 - - 8,316
- Cat dasar 1.047 1.047 Kg 58,000 60,738 - - 60,738
- Cat penutup 2 kali 1.602 1.602 Kg 58,000 92,893 - - 92,893
F. PEKERJAAN FINISHING
6.1 Plesteran
- Semen Portland 3,213.821 3,213.821 Kg 1,340 4,306,520 - - 4,306,520
- Pasir pasang 9.609 9.609 M³ 242,000 2,325,432 - - 2,325,432
6.2 Acian
- Semen Portland 1,007.419 1,007.419 Kg 1,340 1,349,941 - - 1,349,941
6.3 Pekerjaan Man Hole 80 x 80
- Penutup Man Hole Besi Plat 80 x 80 1.000 1.000 Ls 300,000 300,000 - - 300,000
6.4 Pipa Vent Gip Ø 2"
- Pipa Vent Gip Ø 2" 1.000 1.000 Ls 150,000 150,000 - - 150,000
6.5 Pengecatan
- Plamir tembok 30.998 30.998 Kg 9,000 278,978 - - 278,978
- Cat dasar 30.998 30.998 Kg 105,000 3,254,738 - - 3,254,738
- Cat tembok 80.594 80.594 Kg 105,000 8,462,318 - - 8,462,318
6.6 Tangga Monyet
Tangga Monyet Pipa GIP Ø ¾" 1.000 1.000 Ls 2,000,000 2,000,000 - - 2,000,000
G. PEKERJAAN PIPA
- Pipa inlet GIP Ø 2" Medium A 2.000 2.000 Btg 720,000 1,440,000 - - 1,440,000
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5 3 4 5 6 7 8=2x7 9=3x7 10=4x7 11=5x7
- Pipa outlet GIP Ø 3" Medium A 3.000 3.000 Btg 1,200,000 3,600,000 - - 3,600,000
- Pipa penguras GIP Ø 2" Medium A 1.000 1.000 Btg 720,000 720,000 - - 720,000
- Pipa peluap GIP Ø 2" Medium A 1.000 1.000 Btg 720,000 720,000 - - 720,000
- Gate valve GIP Ø 3" 2.000 2.000 Bh 1,335,000 2,670,000 - - 2,670,000
- Gate valve GIP Ø 2" 1.000 1.000 Bh 493,000 493,000 - - 493,000
- Knee 90° GIP Ø 3" 4.000 4.000 Bh 156,000 624,000 - - 624,000
- Knee 90° GIP Ø 2" 5.000 5.000 Bh 56,000 280,000 - - 280,000
- Knee 90° GIP Ø 1 1/2" - - Bh 40,000 - - - -
- Knee 90° PVC Ø 3" 2.000 2.000 Bh 104,000 208,000 - - 208,000
- Socket GIP Ø 3" 2.000 2.000 Bh 103,000 206,000 - - 206,000
- Socket GIP Ø 2" 2.000 2.000 Bh 43,000 86,000 - - 86,000
- Socket GIP Ø 1 1/2" - - Bh 37,000 - - - -
- Sock Drat Luar PVC SNI Ø 3" 4.000 4.000 Bh 85,000 340,000 - - 340,000
- Sock Drat luar PVC SNI Ø 2" 2.000 2.000 Bh 38,000 76,000 - - 76,000
- Sock Drat luar PVC SNI Ø 1 1/2" - - Bh 15,000 - - - -
- Lem Pipa 1.000 1.000 Klg 45,000 45,000 - - 45,000
- Seal Tape 5.000 5.000 Bh 5,000 25,000 - - 25,000
- Cat Meni Besi 2.000 2.000 Kg 47,000 94,000 - - 94,000
- Cat Besi 4.000 4.000 Kg 36,000 144,000 - - 144,000
G. PEKERJAAN BOX VALVE
7.1 Pasir Urug
- Pasir Urug - - m³ 242,000 - - - -
7.2 Pas. Batu 1/2 Bata 1:4
- Bata merah 5 x 11 x 22 cm - - Bh 1,000 - - - -
- Semen Portland - - Kg 1,340 - - - -
- Pasir pasang - - M³ 242,000 - - - -
7.3 Pek. Plesteran 1:2
- Semen Portland - - Kg 1,340 - - - -
- Pasir pasang - - M³ 242,000 - - - -
7.4 Penutup Box Valve 60 x 60
- Penutup Man Hole Besi Plat 60 x 60 - - Ls 250,000 - - - -

Sub Total 1) 138,670,377 - 8,668,520 130,001,857


Dibulatkan 138,670,000 - 8,669,000 130,002,000
2 UPAH
A. PEKERJAAN PENDAHULUAN
1.1 Membersihkan Lapangan dan Perataan
- Pekerja 2.100 2.100 - Hok 100,000 210,000 - 210,000 -
1.2 Pemasangan Bowplank
- Pekerja 0.200 0.200 - Hok 100,000 20,000 - 20,000 -
- Tukang 0.200 0.200 - Hok 120,000 24,000 - 24,000 -
B. PEKERJAAN TANAH
2.1 Galian Tanah
- Pekerja 1.102 1.102 - Hok 100,000 110,160 - 110,160 -
2.2 Urugan Pasir
- Pekerja 0.367 0.367 - Hok 100,000 36,720 - 36,720 -
2.3 Urugan Kembali
- Pekerja 0.612 0.612 - Hok 100,000 61,200 - 61,200 -
C. PEKERJAAN BETON
3.1 Lantai Kerja
- Pekerja 0.734 0.734 - Hok 100,000 73,440 - 73,440 -
- Tukang 0.122 0.122 - Hok 120,000 14,688 - 14,688 -
3.2 Rabat Beton Lantai Dasar 10 cm
- Pekerja 0.327 0.327 Hok 100,000 32,670 - - 32,670
- Tukang 0.054 0.054 - Hok 120,000 6,534 - 6,534 -
3.3 Pondasi Poor Plat 1,5 x 1,5
* Beton
- Pekerja 5.198 5.198 Hok 100,000 519,750 - - 519,750
- Tukang 0.866 0.866 - Hok 120,000 103,950 - 103,950 -
* Pembesian
- Pekerja 3.684 3.684 - Hok 100,000 368,447 - 368,447 -
- Tukang 3.684 3.684 - Hok 120,000 442,136 - 442,136 -
* Bekisting
- Pekerja 2.496 2.496 - Hok 100,000 249,600 - 249,600 -
- Tukang 1.248 1.248 - Hok 120,000 149,760 - 149,760 -
3.4 Kolom 40x40 K1
* Beton
- Pekerja 9.504 9.504 Hok 100,000 950,400 - 950,400 -
- Tukang 1.584 1.584 - Hok 120,000 190,080 - 190,080 -
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5 3 4 5 6 7 8=2x7 9=3x7 10=4x7 11=5x7
* Pembesian
- Pekerja 4.309 - 4.309 Hok 100,000 430,860 - - 430,860
- Tukang 4.309 4.309 Hok 120,000 517,031 - - 517,031
* Bekisting
- Pekerja 12.672 12.672 Hok 100,000 1,267,200 - - 1,267,200
- Tukang 6.336 6.336 Hok 120,000 760,320 - - 760,320
3.5 Kolom 20x20 K2
* Beton
- Pekerja 0.455 0.455 - Hok 100,000 45,540 - 45,540 -
- Tukang 0.076 0.076 - Hok 120,000 9,108 - 9,108 -
* Pembesian
- Pekerja 0.255 0.255 - Hok 100,000 25,520 - 25,520 -
- Tukang 0.255 0.255 - Hok 120,000 30,624 - 30,624 -
* Bekisting
- Pekerja 2.112 2.112 - Hok 100,000 211,200 - 211,200 -
- Tukang 1.056 1.056 Hok 120,000 126,720 - - 126,720
3.6 Balok 20 x 40 (B2)
* Beton
- Pekerja 3.425 3.425 Hok 100,000 342,540 - - 342,540
- Tukang 0.571 0.571 - Hok 120,000 68,508 - 68,508 -
* Pembesian
- Pekerja 2.767 2.767 - Hok 100,000 276,717 - 276,717 -
- Tukang 2.767 2.767 Hok 120,000 332,061 - - 332,061
* Bekisting
- Pekerja 6.851 - 6.851 Hok 100,000 685,080 - - 685,080
- Tukang 3.425 3.425 Hok 120,000 411,048 - - 411,048
3.7 Balok 25 x 40 ( B1 )
* Beton
- Pekerja 1.617 1.617 - Hok 100,000 161,700 - 161,700 -
- Tukang 0.270 0.270 - Hok 120,000 32,340 - 32,340 -
* Pembesian
- Pekerja 1.121 1.121 - Hok 100,000 112,136 - 112,136 -
- Tukang 1.121 1.121 Hok 120,000 134,563 - - 134,563
* Bekisting
- Pekerja 3.696 - 3.696 Hok 100,000 369,600 - - 369,600
- Tukang 1.848 1.848 Hok 120,000 221,760 - - 221,760
3.8 Sloef 20 x 40 ( S1 )
* Beton
- Pekerja 2.284 2.284 - Hok 100,000 228,360 - 228,360 -
- Tukang 0.381 0.381 - Hok 120,000 45,672 - 45,672 -
* Pembesian
- Pekerja 1.531 - 1.531 Hok 100,000 153,119 - - 153,119
- Tukang 1.531 1.531 Hok 120,000 183,742 - - 183,742
* Bekisting
- Pekerja 2.399 - 2.399 Hok 100,000 239,893 - - 239,893
- Tukang 1.199 1.199 Hok 120,000 143,936 - - 143,936
3.9 Ringbalk 20 x 25 ( RB1 )
* Beton
- Pekerja 2.718 2.718 - Hok 100,000 271,838 - 271,838 -
- Tukang 0.453 0.453 - Hok 120,000 54,368 - 54,368 -
* Pembesian
- Pekerja 1.095 - 1.095 Hok 100,000 109,455 - - 109,455
- Tukang 1.095 1.095 Hok 120,000 131,346 - - 131,346
* Bekisting
- Pekerja 2.856 - 2.856 Hok 100,000 285,567 - - 285,567
- Tukang 1.428 1.428 Hok 120,000 171,340 - - 171,340
3.10 Plat Lantai t. 20 cm
* Beton
- Pekerja 3.594 3.594 - Hok 100,000 359,370 - 359,370 -
- Tukang 0.599 0.599 - Hok 120,000 71,874 - 71,874 -
* Pembesian
- Pekerja 1.394 - 1.394 Hok 100,000 139,449 - - 139,449
- Tukang 1.394 1.394 Hok 120,000 167,339 - - 167,339
* Bekisting
- Pekerja 0.558 0.558 - Hok 100,000 55,811 - 55,811 -
- Tukang 0.279 0.279 Hok 120,000 33,487 - - 33,487
3.11 Dinding Beton t. 20 cm
* Beton
- Pekerja 10.890 - 10.890 Hok 100,000 1,089,000 - - 1,089,000
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5 3 4 5 6 7 8=2x7 9=3x7 10=4x7 11=5x7
- Tukang 1.815 - 1.815 Hok 120,000 217,800 - - 217,800
* Pembesian
- Pekerja 4.246 - 4.246 Hok 100,000 424,562 - - 424,562
- Tukang 4.246 4.246 Hok 120,000 509,475 - 509,475 -
* Bekisting
- Pekerja 14.520 14.520 Hok 100,000 1,452,000 - 1,452,000 -
- Tukang 7.260 7.260 Hok 120,000 871,200 - - 871,200
3.12 Plat Atap t. 12 cm
* Beton
- Pekerja 3.234 - 3.234 Hok 100,000 323,433 - - 323,433
- Tukang 0.539 - 0.539 Hok 120,000 64,687 - - 64,687
* Pembesian
- Pekerja 2.047 2.047 - Hok 100,000 204,666 - 204,666 -
- Tukang 2.047 2.047 Hok 120,000 245,599 - - 245,599
* Bekisting
- Pekerja 5.391 5.391 Hok 100,000 539,055 - 539,055 -
- Tukang 2.695 2.695 - Hok 120,000 323,433 - 323,433 -
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5 3 4 5 6 7 8=2x7 9=3x7 10=4x7 11=5x7
3.13 Balok Profil
* Beton
- Pekerja 2.427 2.427 - Hok 100,000 242,735 - 242,735 -
- Tukang 0.405 - 0.405 Hok 120,000 48,547 - - 48,547
* Pembesian
- Pekerja 0.259 - 0.259 Hok 100,000 25,900 - - 25,900
- Tukang 0.259 0.259 Hok 120,000 31,079 - - 31,079
* Bekisting
- Pekerja 3.937 3.937 Hok 100,000 393,676 - 393,676 -
- Tukang 1.968 1.968 Hok 120,000 236,206 - - 236,206
D. PEKERJAAN DINDING
5.1 Pas.Batu Merah 1/2 (1:2)
- Pekerja 3.351 3.351 - Hok 100,000 335,100 - 335,100 -
- Tukang 1.117 1.117 Hok 120,000 134,040 - - 134,040
5.2 Pas. Rooster
- Pekerja 0.060 0.060 - Hok 100,000 6,000 - 6,000 -
- Tukang 0.020 0.020 Hok 120,000 2,400 - - 2,400
E. PEKERJAAN PINTU DAN JENDELA
5.1 Pengecatan Bidang Kayu baru
- Pekerja 0.431 0.431 - Hok 100,000 43,120 - 43,120 -
- Tukang 0.055 - 0.055 Hok 120,000 6,653 - - 6,653
F. PEKERJAAN FINISHING
6.1 Plesteran
- Pekerja 80.594 - 80.594 Hok 100,000 8,059,350 - - 8,059,350
- Tukang 61.995 61.995 - Hok 120,000 7,439,400 - 7,439,400 -
6.2 Acian
- Pekerja 61.995 61.995 - Hok 100,000 6,199,500 - 6,199,500 -
- Tukang 30.998 30.998 Hok 120,000 3,719,700 - - 3,719,700
6.3 Pengecetan
- Pekerja 6.200 6.200 Hok 100,000 619,950 - - 619,950
- Tukang 19.528 19.528 Hok 120,000 2,343,411 - - 2,343,411
G. PEKERJAAN PIPA
7.1 Pek. Pipa GIP
- Pekerja 26.910 26.910 Hok 100,000 - - - -
- Tukang 13.416 13.416 Hok 120,000 - - - -
Sub Total 2) 49,133,353 - 22,759,961 26,373,392
Dibuatkan 49,133,000 - 22,760,000 26,373,000
Jumlah Total) 187,803,000 - 31,429,000 156,375,000

Alelebbae, Desember 2019

Disetujui Oleh : Dibuat Oleh :


Ketua DPMU Kabupaten Wajo KKM "ALELEBBAE" Fasilitator Masyarakat Pelaksana Pamsimas

( MUH. TAUFIQ, ST ) ( ABDUL HAMID ) ( ANDI ADRI ANSYA, ST ) ( SAHARUDDIN )


NIP : 19750717 2009 02 1003 Koordinator FM - WSS Ketua SATLAK
RENCANA ANGGARAN BIAYA
Provinsi/Kabupaten-Kota/Kecamatan/Desa : Sulawesi Selatan/Wajo/Pitumpanua/Alelebbae
Nomor RAB : 05 Sub pekerjaan/Kegiatan : Reservoir
Pekerjaan Kegiatan : Sarana Air Minum Ukuran/Dimensi : 2,8 x 2,8 x 2,1 m
Kapasitas : 16 m³
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5+6 3 4 5 7 8 9=2x8 10=3x8 11=4x8 12=5x8
1 BAHAN
A. PEKERJAAN PENDAHULUAN
1.1 Pemasangan Bowplank 12.80
- Kayu klas III uk. 5/7 0.180 0.180 - M³ 2,800,000 504,000 - 504,000 -
- Paku biasa 2" - 5" 0.256 0.256 Kg 22,000 5,632 - - 5,632
- Kayu papan kls. III 3/20 0.090 0.090 M³ 2,800,000 250,880 - 250,880 -
B. PEKERJAAN TANAH -
2.1 Urugan Pasir 1.101 -
- Pasir urug 1.469 1.469 M³ 242,000 355,450 - - 355,450
C. PEKERJAAN BETON -
3.1 Lantai Kerja t. 5 cm 0.612 -
- Semen Portland 140.760 140.760 M³ 1,340 188,618 - - 188,618
- Pasir beton 0.390 0.390 M³ 306,000 119,453 - - 119,453
- Batu pecah 2/3 cm 0.466 0.466 M³ 591,000 275,154 - - 275,154
3.2 Pondasi Poor Plat 1,5 x 1,5 -
* Beton 3.150 -
- Semen portland 1,108.800 1,108.800 Kg 1,340 1,485,792 - - 1,485,792
- Pasir Beton 1.645 1.645 M³ 306,000 503,294 - - 503,294
- Batu pecah 2/3 cm 2.406 2.406 M³ 591,000 1,421,749 - - 1,421,749
* Pembesian 263.176 -
- Besi beton Polos Ø 14 276.335 276.335 Kg 15,840 4,377,212 - - 4,377,212
- Kawat beton 3.948 3.948 Kg 23,000 90,796 - - 90,796
* Bekisting 4.800 -
- Balok Kayu Kls. III 0.192 - 0.192 M³ 2,800,000 537,600 - - 537,600
- Paku biasa 2" - 5" 1.440 1.440 Kg 22,000 31,680 - - 31,680
3.3 Kolom 30x30 -
* Beton 3.240 -
- Semen portland 1,140.480 1,140.480 Kg 1,340 1,528,243 - - 1,528,243
- Pasir Beton 1.692 1.692 M³ 306,000 517,673 - - 517,673
- Batu pecah 2/3 cm 2.474 2.474 M³ 591,000 1,462,370 - 1,462,370
* Pembesian 473.433 -
- Besi beton Polos Ø 14 387.732 387.732 Kg 15,840 6,141,763 - - 6,141,763
- Besi beton Polos Ø 8 109.372 109.372 Kg 15,823 1,730,570 - - 1,730,570
- Kawat beton 7.101 7.101 Kg 23,000 163,334 - - 163,334
* Bekisting 14.400 -
- Paku biasa 2" - 5" 5.760 5.760 Kg 22,000 126,720 - - 126,720
- Balok Kayu Kls. II 0.216 - 0.216 M³ 3,682,000 795,312 - - 795,312
- Tripleks 9 mm 5.040 5.040 Lbr 110,000 554,400 - - 554,400
- Bambu 21.600 21.600 - Btg 31,000 669,600 - 669,600 -
3.4 Kolom 20x20 K2 -
* Beton 0.368 -
- Semen portland 129.536 129.536 Kg 1,340 173,578 - - 173,578
- Pasir Beton 0.192 0.192 M³ 306,000 58,797 - - 58,797
- Batu pecah 2/3 cm 0.281 0.281 M³ 591,000 166,096 - 166,096
* Pembesian 51.030 -
- Besi beton Polos Ø 12 35.794 35.794 Kg 15,860 567,687 - - 567,687
- Besi beton Polos Ø 8 17.787 17.787 Kg 15,823 281,436 - - 281,436
- Kawat beton 0.765 0.765 Kg 23,000 17,605 - - 17,605
* Bekisting 2.453 -
- Paku biasa 2" - 5" 0.981 0.981 Kg 22,000 21,589 - - 21,589
- Balok Kayu Kls. III 0.037 0.037 - M³ 2,800,000 103,040 - 103,040 -
- Tripleks 9 mm 0.859 0.859 Lbr 110,000 94,453 - - 94,453
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5+6 3 4 5 7 8 9=2x8 10=3x8 11=4x8 12=5x8
- Bambu 4.907 4.907 - Btg 31,000 152,107 - 152,107 -
3.5 Kolom 15x15 KP -
* Beton 0.140 -
- Semen portland 49.421 49.421 Kg 1,340 66,224 - - 66,224
- Pasir Beton 0.073 0.073 M³ 306,000 22,433 - - 22,433
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5+6 3 4 5 7 8 9=2x8 10=3x8 11=4x8 12=5x8
- Batu pecah 2/3 cm 0.107 0.107 M³ 591,000 63,369 - 63,369
* Pembesian 31.431 -
- Besi beton Polos Ø 12 24.385 24.385 Kg 15,860 386,736 - - 386,736
- Besi beton Polos Ø 8 8.617 8.617 Kg 15,823 136,348 - - 136,348
- Kawat beton 0.471 0.471 Kg 23,000 10,844 - - 10,844
* Bekisting 1.248 -
- Paku biasa 2" - 5" 0.499 0.499 Kg 22,000 10,982 - - 10,982
- Balok Kayu Kls. II 0.019 0.019 - M³ 3,682,000 68,927 - 68,927 -
- Tripleks 9 mm 0.437 0.437 Lbr 110,000 48,048 - - 48,048
- Bambu 2.496 2.496 - Btg 31,000 77,376 - 77,376 -
3.6 Balok 20 x 30 (B2) -
* Beton 1.776 -
- Semen portland 625.152 625.152 Kg 1,340 837,704 - - 837,704
- Pasir Beton 0.927 0.927 M³ 306,000 283,762 - - 283,762
- Batu pecah 2/3 cm 1.356 1.356 M³ 591,000 801,596 - - 801,596
* Pembesian 311.711 -
- Besi beton Polos Ø 14 265.551 265.551 Kg 15,840 4,206,384 - - 4,206,384
- Besi beton Polos Ø 8 61.745 61.745 Kg 15,823 976,985 - - 976,985
- Kawat beton 4.676 4.676 Kg 23,000 107,540 - - 107,540
* Bekisting 7.893 -
- Paku biasa 2" - 5" 3.157 - 3.157 Kg 22,000 69,461 - - 69,461
- Balok Kayu Kls. II 0.142 0.142 - M³ 3,682,000 523,139 - 523,139 -
- Tripleks 9 mm 2.763 - 2.763 Lbr 110,000 303,893 - - 303,893
- Bambu 47.360 47.360 Btg 31,000 1,468,160 - 1,468,160 -
3.7 Balok 20 x 35 ( B1 ) -
* Beton 0.840 -
- Semen portland 295.680 295.680 - Kg 1,340 396,211 - 396,211 -
- Pasir Beton 0.439 0.439 M³ 306,000 134,212 - - 134,212
- Batu pecah 2/3 cm 0.642 0.642 M³ 591,000 379,133 - - 379,133
* Pembesian 134.334 -
- Besi beton Polos Ø 14 107.908 107.908 Kg 15,840 1,709,283 - - 1,709,283
- Besi beton Polos Ø 8 33.143 33.143 Kg 15,823 524,415 - - 524,415
- Kawat beton 2.015 2.015 Kg 23,000 46,345 - - 46,345
* Bekisting 3.600 -
- Paku biasa 2" - 5" 1.440 1.440 Kg 22,000 31,680 - - 31,680
- Balok Kayu Kls. II 0.065 0.065 - M³ 3,682,000 238,594 - 238,594 -
- Tripleks 9 mm 1.260 1.260 - Lbr 110,000 138,600 - 138,600 -
- Bambu 7.200 7.200 - Btg 31,000 223,200 - 223,200 -
3.8 Sloef 20 x 30 ( S1 ) -
* Beton 0.720 -
- Semen portland 253.440 253.440 Kg 1,340 339,610 - - 339,610
- Pasir Beton 0.376 0.376 M³ 306,000 115,039 - - 115,039
- Batu pecah 2/3 cm 0.550 0.550 M³ 591,000 324,971 - - 324,971
* Pembesian 145.859 -
- Besi beton Polos Ø 14 123.323 123.323 Kg 15,840 1,953,466 - - 1,953,466
- Besi beton Polos Ø 8 29.829 29.829 Kg 15,823 471,974 - - 471,974
- Kawat beton 2.188 2.188 Kg 23,000 50,321 - - 50,321
* Bekisting 2.400 -
- Paku biasa 2" - 5" 0.960 0.960 Kg 22,000 21,120 - - 21,120
- Balok Kayu Kls. II 0.043 0.043 - M³ 3,682,000 159,062 - 159,062 -
- Tripleks 9 mm 0.840 0.840 Lbr 110,000 92,400 - 92,400 -
- Bambu 4.800 4.800 - Btg 31,000 148,800 - 148,800 -
3.9 Ringbalk 20 x 25 ( RB1 ) -
* Beton 0.600 -
- Semen portland 211.200 211.200 Kg 1,340 283,008 - - 283,008
- Pasir Beton 0.313 0.313 M³ 306,000 95,865 - - 95,865
- Batu pecah 2/3 cm 0.458 0.458 M³ 591,000 270,809 - - 270,809
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5+6 3 4 5 7 8 9=2x8 10=3x8 11=4x8 12=5x8
* Pembesian 68.397 -
- Besi beton Polos Ø 12 45.302 45.302 Kg 15,860 718,478 - - 718,478
- Besi beton Polos Ø 8 26.514 26.514 Kg 15,823 419,532 - - 419,532
- Kawat beton 1.026 1.026 Kg 23,000 23,597 - - 23,597
* Bekisting 2.000 -
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5+6 3 4 5 7 8 9=2x8 10=3x8 11=4x8 12=5x8
- Paku biasa 2" - 5" 0.800 0.800 Kg 22,000 17,600 - - 17,600
- Balok Kayu Kls. II 0.036 0.036 - M³ 3,682,000 132,552 - 132,552 -
- Tripleks 9 mm 0.700 0.700 - Lbr 110,000 77,000 - 77,000 -
- Bambu 4.000 4.000 - Btg 31,000 124,000 - 124,000 -
3.10 Ringbalk 20 x 25 ( RB2 ) -
* Beton 0.445 -
- Semen portland 156.640 156.640 Kg 1,340 209,898 - - 209,898
- Pasir Beton 0.232 0.232 M³ 306,000 71,100 - - 71,100
- Batu pecah 2/3 cm 0.340 0.340 M³ 591,000 200,850 - - 200,850
* Pembesian 57.389 -
- Besi beton Polos Ø 12 33.744 33.744 Kg 15,860 535,163 - - 535,163
- Besi beton Polos Ø 8 26.514 26.514 Kg 15,823 419,532 - - 419,532
- Kawat beton 0.861 - 0.861 Kg 23,000 19,799 - - 19,799
* Bekisting 2.000 -
- Paku biasa 2" - 5" 0.800 0.800 - Kg 22,000 17,600 - 17,600 -
- Balok Kayu Kls. II 0.036 0.036 - M³ 3,682,000 132,552 - 132,552 -
- Tripleks 9 mm 0.700 0.700 Lbr 110,000 77,000 - 77,000 -
- Bambu 4.000 4.000 - Btg 31,000 124,000 - 124,000 -
3.11 Plat Lantai t. 15 cm -
* Beton 1.536 -
- Semen portland 540.672 223.881 316.791 Kg 1,340 724,500 - 300,000 424,500
- Pasir Beton 0.802 0.802 M³ 306,000 245,415 - - 245,415
- Batu pecah 2/3 cm 1.173 1.173 M³ 591,000 693,272 - - 693,272
* Pembesian 149.996 -
- Besi beton Polos Ø 12 157.496 157.496 Kg 15,860 2,497,821 - - 2,497,821
- Kawat beton 2.250 2.250 Kg 23,000 51,749 - - 51,749
* Bekisting 4.267 -
- Paku biasa 2" - 5" 1.707 1.707 - Kg 22,000 37,547 - 37,547 -
- Balok Kayu Kls. II 0.064 0.064 - M³ 3,682,000 235,648 - 235,648 -
- Tripleks 9 mm 1.493 1.493 - Lbr 110,000 164,267 - 164,267 -
- Bambu 76.800 - 76.800 Btg 31,000 2,380,800 - - 2,380,800
3.12 Dinding Beton t. 20 cm -
* Beton 4.416 -
- Semen portland 1,554.432 1,554.432 Kg 1,340 2,082,939 - - 2,082,939
- Pasir Beton 2.306 2.306 M³ 306,000 705,570 - - 705,570
- Batu pecah 2/3 cm 3.373 3.373 M³ 591,000 1,993,157 - - 1,993,157
* Pembesian 4.416 -
- Besi beton Polos Ø 12 452.800 452.800 Kg 15,860 7,181,235 - - 7,181,235
- Kawat beton 6.469 6.469 Kg 23,000 148,777 - - 148,777
* Bekisting 19.627 -
- Paku biasa 2" - 5" 7.851 7.851 Kg 22,000 172,715 - - 172,715
- Balok Kayu Kls. II 0.393 - 0.393 M³ 3,682,000 1,445,308 - - 1,445,308
- Tripleks 9 mm 6.869 6.869 Lbr 110,000 755,627 - - 755,627
- Bambu 58.880 58.880 - Btg 31,000 1,825,280 - 1,825,280 -
3.13 Plat Atap t. 12 cm -
* Beton 1.685 -
- Semen portland 593.155 261.194 331.961 Kg 1,340 794,828 - 350,000 444,828
- Pasir Beton 0.880 0.880 M³ 306,000 269,238 - - 269,238
- Batu pecah 2/3 cm 1.287 1.287 M³ 591,000 760,568 - - 760,568
* Pembesian 232.920 -
- Besi beton Polos Ø 10 244.566 244.566 Kg 15,802 3,864,698 - - 3,864,698
- Kawat beton 3.494 3.494 Kg 23,000 80,357 - - 80,357
* Bekisting 4.129 -
- Paku biasa 2" - 5" 1.651 1.651 Kg 22,000 36,332 - - 36,332
- Balok Kayu Kls. II 0.062 0.062 - M³ 3,682,000 228,024 - 228,024 -
- Tripleks 9 mm 1.445 1.445 Lbr 110,000 158,952 - - 158,952
- Bambu 24.772 24.772 Btg 31,000 767,924 - 767,924 -
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5+6 3 4 5 7 8 9=2x8 10=3x8 11=4x8 12=5x8
3.14 Balok Profil -
* Beton 1.167 -
- Semen portland 410.911 410.911 Kg 1,340 550,620 - - 550,620
- Pasir Beton 0.610 0.610 M³ 306,000 186,516 - - 186,516
- Batu pecah 2/3 cm 0.841 0.841 M³ 591,000 497,213 - - 497,213
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5+6 3 4 5 7 8 9=2x8 10=3x8 11=4x8 12=5x8
* Pembesian 32.067 -
- Besi beton Polos Ø 10 33.671 33.671 Kg 15,802 532,074 - - 532,074
- Kawat beton 0.481 0.481 Kg 23,000 11,063 - - 11,063
* Bekisting 3.667 -
- Paku biasa 2" - 5" 1.467 1.467 Kg 22,000 32,269 - - 32,269
- Balok Kayu Kls. II 0.066 0.066 - M³ 3,682,000 243,141 - 243,141 -
- Tripleks 6 mm 1.283 1.283 - Lbr 110,000 141,177 - 141,177 -
- Bambu 7.334 7.334 Btg 31,000 227,351 - 227,351 -
D. PEKERJAAN DINDING -
4.1 Pas.Batu Merah 1/2 (1:2) 11.170 -
- Bata merah 781.900 781.900 Bh 1,000 781,900 - - 781,900
- Semen Portland 128.455 128.455 Kg 1,340 172,130 - - 172,130
- Pasir pasang 0.480 0.480 m³ 242,000 116,235 - - 116,235
4.2. Pas. Rooster 0.200 -
- Rooster 6.000 6.000 Bh 40,000 240,000 - - 240,000
- Semen Portland 2.200 2.200 Kg 1,340 2,948 - - 2,948
- Pasir pasang 0.007 0.007 M³ 242,000 1,694 - - 1,694
C. PEKERJAAN PINTU -
3.1. Pekerjaan Pintu dan Jendela -
- Kusen Pintu 1.000 1.000 Bh 668,000 668,000 - - 668,000
- Kusen Jendela 1.000 1.000 Bh 200,000 200,000 - - 200,000
- Daun Pintu 1.000 1.000 Bh 757,000 757,000 - - 757,000
- Kaca 5mm 0.362 0.362 m2 125,000 45,238 - - 45,238
- Engsel Kupu kupu 3.000 3.000 Bh 39,000 117,000 - - 117,000
- Kunci Tanam 1.000 1.000 Bh 223,000 223,000 - - 223,000
3.2. Pengecatan Bidang Kayu baru 6.160 -
- Cat meni 1.232 1.232 Kg 47,000 57,904 - - 57,904
- Plamir Kayu 0.924 0.924 Kg 9,000 8,316 - - 8,316
- Cat dasar 1.047 1.047 Kg 58,000 60,738 - - 60,738
- Cat penutup 2 kali 1.602 1.602 Kg 58,000 92,893 - - 92,893
D. PEKERJAAN FINISHING -
4.1 Plesteran 242.505 -
- Semen Portland 2,017.642 2,017.642 Kg 1,340 2,703,640 - - 2,703,640
- Pasir pasang 7.760 7.760 M³ 242,000 1,877,959 - - 1,877,959
4.2 Acian 242.505 -
- Semen Portland 788.141 788.141 Kg 1,340 1,056,109 - - 1,056,109
4.3 Pekerjaan Man Hole 80 x 80 -
- Penutup Man Hole Besi Plat 80 x 80 1.000 1.000 Ls 900,000 900,000 - - 900,000
4.4 Pipa Vent Gip Ø 2" -
- Pipa Vent Gip Ø 2" 0.856 0.856 Ls 250,000 214,000 - - 214,000
4.5 Pengecatan 242.505 -
- Plamir tembok 24.251 24.251 Kg 9,000 218,255 - - 218,255
- Cat dasar 24.251 24.251 Kg 105,000 2,546,303 - - 2,546,303
- Cat tembok 63.051 63.051 Kg 105,000 6,620,387 - - 6,620,387
4.6 Tangga Monyet -
Tangga Monyet Pipa GIP Ø ¾" 1.000 1.000 Ls 2,000,000 2,000,000 - - 2,000,000
E. PEKERJAAN PIPA -
- Pipa inlet GIP Ø 1 1/2" Medium A 2.000 2.000 Btg 527,000 1,054,000 - - 1,054,000
- Pipa outlet GIP Ø 2" Medium A 4.000 4.000 Btg 720,000 2,880,000 - - 2,880,000
- Pipa penguras GIP Ø 1 1/2" Medium A 1.000 1.000 Btg 527,000 527,000 - - 527,000
- Pipa peluap GIP Ø 1 1/2" Medium A 2.000 2.000 Btg 527,000 1,054,000 - - 1,054,000
- Gate valve GIP Ø 2" 3.000 3.000 Bh 493,000 1,479,000 - - 1,479,000
- Knee 90° GIP Ø 1 1/2" 2.000 2.000 Bh 40,000 80,000 - - 80,000
- Knee 90° GIP Ø 2" 6.000 6.000 Bh 56,000 336,000 - - 336,000
- Socket GIP Ø 2" 4.000 4.000 Bh 43,000 172,000 - - 172,000
- Socket GIP Ø 1 1/2" 2.000 2.000 Bh 37,000 74,000 - - 74,000
- Sock Drat luar PVC SNI Ø 2" 2.000 2.000 Bh 38,000 76,000 - - 76,000
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5+6 3 4 5 7 8 9=2x8 10=3x8 11=4x8 12=5x8
- Sock Drat luar PVC SNI Ø 1 1/2" 1.000 1.000 Bh 15,000 15,000 - - 15,000
- Lem Pipa 5.000 5.000 Klg 45,000 225,000 - - 225,000
- Seal Tape 10.000 10.000 Bh 5,000 50,000 - - 50,000
- Cat Meni Besi 3.000 3.000 Kg 47,000 141,000 - - 141,000
- Cat Besi 6.000 6.000 Kg 36,000 216,000 - - 216,000
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5+6 3 4 5 7 8 9=2x8 10=3x8 11=4x8 12=5x8
F. PEKERJAAN BOX VALVE -
6.1 Pasir Urug 0.041 -
- Pasir Urug 0.049 0.049 m³ 242,000 11,817 - - 11,817
6.2 Pas. Batu 1/2 Bata 1:4 3.840 -
- Bata merah 5 x 11 x 22 cm 268.800 268.800 Bh 1,000 268,800 - - 268,800
- Semen Portland 44.160 44.160 Kg 1,340 59,174 - - 59,174
- Pasir pasang 0.165 0.165 M³ 242,000 39,959 - - 39,959
6.3 Pek. Plesteran 1:2 7.680 -
- Semen Portland 63.898 63.898 Kg 1,340 85,623 - - 85,623
- Pasir pasang 0.246 0.246 M³ 242,000 59,474 - - 59,474
6.4 Penutup Box Valve 60 x 80 -
- Penutup Man Hole Besi Plat 60 x 80 1.000 1.000 Ls 750,000 750,000 - - 750,000
G. BAHAN PENJERNIH
- Karbon Aktif 3.000 3.000 Ls 350,000 1,050,000 - - 1,050,000

Sub Total 1) 111,471,431 - 10,419,158 102,102,273


Dibulatkan 111,471,000 10,419,000 102,102,000
2 UPAH
A. PEKERJAAN PENDAHULUAN
1.1 Membersihkan Lapangan dan Peralatan 21.00
- Pekerja 2.100 2.100 - Hok 100,000 210,000 - 210,000 -
1.2 Pemasangan Bowplank 12.800 -
- Pekerja 1.280 1.280 - Hok 100,000 128,000 - 128,000 -
- Tukang 1.280 1.280 - Hok 120,000 153,600 - 153,600 -
B. PEKERJAAN TANAH -
2.1 Galian Tanah 1.224 -
- Pekerja 0.918 0.918 - Hok 100,000 91,800 - 91,800 -
2.2 Urugan Pasir 1.224 -
- Pekerja 0.367 0.367 - Hok 100,000 36,720 - 36,720 -
2.3 Urugan Kembali 1.224 -
- Pekerja 0.306 0.306 - Hok 100,000 30,600 - 30,600 -
C. PEKERJAAN BETON -
3.1 Lantai Kerja 0.612 -
- Pekerja 1.010 1.010 Hok 100,000 100,980 - - 100,980
- Tukang 0.168 0.168 Hok 120,000 20,196 - - 20,196
3.2 Pondasi Poor Plat 1,5 x 1,5 - -
* Beton 3.150 - -
- Pekerja 5.198 3.580 1.618 Hok 100,000 519,750 - 358,000 161,750
- Tukang 0.866 0.866 Hok 120,000 103,950 - - 103,950
* Pembesian 263.176 - -
- Pekerja 1.842 1.842 Hok 100,000 184,224 - - 184,224
- Tukang 1.842 1.842 Hok 120,000 221,068 - - 221,068
* Bekisting 4.800 - -
- Pekerja 2.496 2.496 Hok 100,000 249,600 - - 249,600
- Tukang 1.248 1.248 Hok 120,000 149,760 - - 149,760
3.3 Kolom 30x30 - -
* Beton 3.240 - -
- Pekerja 5.346 5.346 Hok 100,000 534,600 - - 534,600
- Tukang 0.891 0.891 Hok 120,000 106,920 - - 106,920
* Pembesian 473.433 - -
- Pekerja 3.314 3.314 Hok 100,000 331,403 - - 331,403
- Tukang 3.314 3.314 Hok 120,000 397,683 - -
* Bekisting 14.400 - -
- Pekerja 9.504 9.504 Hok 100,000 950,400 - - 950,400
- Tukang 4.752 4.752 Hok 120,000 570,240 - - 570,240
3.4 Kolom 20x20 K2 - -
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5+6 3 4 5 7 8 9=2x8 10=3x8 11=4x8 12=5x8
* Beton 0.368 - -
- Pekerja 0.607 0.607 Hok 100,000 60,720 - - 60,720
- Tukang 0.101 0.101 Hok 120,000 12,144 - - 12,144
* Pembesian 51.030 - -
- Pekerja 0.357 0.357 Hok 100,000 35,721 - - 35,721
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5+6 3 4 5 7 8 9=2x8 10=3x8 11=4x8 12=5x8
- Tukang 0.357 0.357 Hok 120,000 42,865 - - 42,865
* Bekisting 2.453 - -
- Pekerja 1.619 1.619 Hok 100,000 161,920 - - 161,920
- Tukang 0.859 0.859 Hok 120,000 103,040 - - 103,040
3.5 Kolom 15x15 KP - -
* Beton 0.140 - -
- Pekerja 0.232 0.232 Hok 100,000 23,166 - - 23,166
- Tukang 0.039 0.039 Hok 120,000 4,633 - - 4,633
* Pembesian 31.431 - -
- Pekerja 0.220 0.220 Hok 100,000 22,001 - - 22,001
- Tukang 0.220 0.220 Hok 120,000 26,402 - - 26,402
* Bekisting 1.248 -
- Pekerja 0.824 0.824 Hok 100,000 82,368 - - 82,368
- Tukang 0.824 0.824 Hok 120,000 98,842 - - 98,842
3.6 Balok 20 x 30 (B2) -
* Beton 1.776 -
- Pekerja 2.930 2.930 Hok 100,000 293,040 - - 293,040
- Tukang 0.488 0.488 Hok 120,000 58,608 - - 58,608
* Pembesian 311.711 -
- Pekerja 0.488 0.488 Hok 100,000 48,840 - - 48,840
- Tukang 0.488 0.488 Hok 120,000 58,608 - - 58,608
* Bekisting 7.893 -
- Pekerja 5.210 5.210 Hok 100,000 520,960 - - 520,960
- Tukang 2.605 2.405 0.200 Hok 120,000 312,576 - 288,576 24,000
3.7 Balok 20 x 35 ( B1 ) -
* Beton 0.840 -
- Pekerja 1.386 1.386 Hok 100,000 138,600 - - 138,600
- Tukang 0.231 0.231 Hok 120,000 27,720 - - 27,720
* Pembesian 134.334 -
- Pekerja 0.940 0.600 0.340 Hok 100,000 94,034 - 60,034 34,000
- Tukang 0.940 0.940 Hok 120,000 112,841 - - 112,841
* Bekisting 3.600 -
- Pekerja 2.376 2.376 - Hok 100,000 237,600 - 237,600 -
- Tukang 1.188 1.188 - Hok 120,000 142,560 - 142,560 -
3.8 Sloef 20 x 30 ( S1 ) -
* Beton 0.720 -
- Pekerja 1.188 1.188 - Hok 100,000 118,800 - 118,800 -
- Tukang 0.198 0.198 - Hok 120,000 23,760 - 23,760 -
* Pembesian 145.859 -
- Pekerja 1.021 1.021 - Hok 100,000 102,101 - 102,101 -
- Tukang 1.021 1.021 - Hok 120,000 122,522 - 122,522 -
* Bekisting 2.400 -
- Pekerja 1.584 1.584 - Hok 100,000 158,400 - 158,400 -
- Tukang 0.792 0.792 - Hok 120,000 95,040 - 95,040 -
3.90 Ringbalk 20 x 25 ( RB1 ) -
* Beton 0.600 -
- Pekerja 0.990 0.990 - Hok 100,000 99,000 - 99,000 -
- Tukang 0.165 0.165 - Hok 120,000 19,800 - 19,800 -
* Pembesian 68.397 -
- Pekerja 0.479 0.479 - Hok 100,000 47,878 - 47,878 -
- Tukang 0.479 0.479 - Hok 120,000 57,453 - 57,453 -
* Bekisting 2.000 -
- Pekerja 1.320 1.320 - Hok 100,000 132,000 - 132,000 -
- Tukang 0.660 0.660 - Hok 120,000 79,200 - 79,200 -
3.8 Ringbalk 20 x 25 ( RB2 ) -
* Beton 0.445 -
- Pekerja 0.734 0.734 - Hok 100,000 73,425 - 73,425 -
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5+6 3 4 5 7 8 9=2x8 10=3x8 11=4x8 12=5x8
- Tukang 0.122 0.122 - Hok 120,000 14,685 - 14,685 -
* Pembesian 57.389 -
- Pekerja 0.402 0.402 - Hok 100,000 40,172 - 40,172 -
- Tukang 0.402 0.402 - Hok 120,000 48,207 - 48,207 -
* Bekisting 2.000 -
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5+6 3 4 5 7 8 9=2x8 10=3x8 11=4x8 12=5x8
- Pekerja 1.320 1.320 - Hok 100,000 132,000 - 132,000 -
- Tukang 0.660 0.660 - Hok 120,000 79,200 - 79,200 -
3.11 Plat Lantai t. 15 cm -
* Beton 1.536 -
- Pekerja 2.534 1.504 1.030 Hok 100,000 253,440 - 150,440 103,000
- Tukang 0.422 0.422 - Hok 120,000 50,688 - 50,688 -
* Pembesian 149.996 -
- Pekerja 1.050 1.050 - Hok 100,000 104,997 - 104,997 -
- Tukang 1.050 1.050 - Hok 120,000 125,997 - 125,997 -
* Bekisting 4.267 -
- Pekerja 2.816 2.816 - Hok 100,000 281,600 - 281,600 -
- Tukang 1.408 1.408 - Hok 120,000 168,960 - 168,960 -
3.12 Dinding Beton t. 20 cm -
* Beton 4.416 -
- Pekerja 7.286 7.286 - Hok 100,000 728,640 - 728,640 -
- Tukang 1.214 1.214 - Hok 120,000 145,728 - 145,728 -
* Pembesian 431.238 -
- Pekerja 3.019 3.019 - Hok 100,000 301,867 - 301,867 -
- Tukang 3.019 3.019 - Hok 120,000 362,240 - 362,240 -
* Bekisting 19.627 -
- Pekerja 12.954 12.954 - Hok 100,000 1,295,360 - 1,295,360 -
- Tukang 6.477 6.477 - Hok 120,000 777,216 - 777,216 -
3.13 Plat Atap t. 12 cm -
* Beton 1.685 -
- Pekerja 2.780 2.780 Hok 100,000 278,042 - - 278,042
- Tukang 0.463 0.463 Hok 120,000 55,608 - - 55,608
* Pembesian 232.920 -
- Pekerja 1.630 1.630 - Hok 100,000 163,044 - 163,044 -
- Tukang 1.630 0.039 1.592 Hok 120,000 195,653 - 4,653 191,000
* Bekisting 4.129 -
- Pekerja 2.725 2.725 - Hok 100,000 272,489 - 272,489 -
- Tukang 1.362 1.362 - Hok 120,000 163,494 - 163,494 -
3.14 Balok Profil -
* Beton 1.167 - -
- Pekerja 1.926 1.926 - Hok 100,000 192,614 - 192,614 -
- Tukang 0.321 0.321 - Hok 120,000 38,523 - 38,523 -
* Pembesian 32.067 -
- Pekerja 0.224 0.224 - Hok 100,000 22,447 - 22,447 -
- Tukang 0.224 0.224 - Hok 120,000 26,937 - 26,937 -
* Bekisting 3.667 -
- Pekerja 2.420 2.420 Hok 100,000 242,018 - 242,018 -
- Tukang 1.210 1.210 Hok 120,000 145,211 - 145,211 -
D. PEKERJAAN DINDING -
4.1 Pas.Batu Merah 1/2 (1:2) 11.170 -
- Pekerja 3.351 - 3.351 Hok 100,000 335,100 - - 335,100
- Tukang 1.117 1.117 Hok 120,000 134,040 - - 134,040
4.2. Pas. Rooster 0.200 -
- Pekerja 0.060 - 0.060 Hok 100,000 6,000 - - 6,000
- Tukang 0.020 0.020 Hok 120,000 2,400 - - 2,400
E. PEKERJAAN PINTU DAN JENDELA -
3.2 Pengecatan Bidang Kayu baru 6.160 -
- Pekerja 0.431 0.431 - Hok 100,000 43,120 - 43,120 -
- Tukang 0.055 0.055 - Hok 120,000 6,653 - 6,653 -
D. PEKERJAAN FINISHING -
4.1 Plesteran 242.505 -
- Pekerja 97.002 19.400 77.602 Hok 100,000 9,700,200 - 1,940,000 7,760,200
- Tukang 48.501 48.501 Hok 120,000 5,820,120 - - 5,820,120
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5+6 3 4 5 7 8 9=2x8 10=3x8 11=4x8 12=5x8
4.2 Acian 242.505 -
- Pekerja 48.501 - 48.501 Hok 100,000 4,850,100 - - 4,850,100
- Tukang 24.251 24.251 Hok 120,000 2,910,060 - - 2,910,060
4.3 Pengecetan 242.505 -
- Pekerja 4.850 - 4.850 Hok 100,000 485,010 - - 485,010
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5+6 3 4 5 7 8 9=2x8 10=3x8 11=4x8 12=5x8
- Tukang 15.278 8.333 6.944 Hok 120,000 1,833,338 - 1,000,000 833,338
E. PEKERJAAN PIPA -
5.1 Pek. Pipa GIP 78.000 -
- Pekerja 4.212 4.212 Hok 100,000 421,200 - - 421,200
- Tukang 7.020 - 7.020 Hok 120,000 842,400 - - 842,400
G. PEKERJAAN BOX VALVE -
6.1 Galian Tanah 0.841 -
- Pekerja 0.631 - 0.631 Hok 100,000 63,077 - - 63,077
6.2 Urugan Tanah 0.188 -
- Pekerja 0.047 0.047 Hok 100,000 4,690 - - 4,690
6.3 Pas. Batu 1/2 bata 1:4 3.840 -
- Pekerja 1.152 1.152 Hok 100,000 115,200 - - 115,200
- Tukang 0.384 0.384 Hok 120,000 46,080 - - 46,080
6.4 Plesteran 1:2 7.680 -
- Pekerja 3.072 3.072 Hok 100,000 307,200 - - 307,200
- Tukang 1.536 1.536 Hok 120,000 184,320 - - 184,320
Sub Total 2) 43,758,065 - 11,936,068 31,424,314
Dibuatkan 43,758,000 11,936,000 31,424,000
Jumlah Total) 155,881,000 22,355,000 133,526,000

Palippu, Juni 2020

Disetujui Oleh : Didampingi oleh : Dibuat Oleh :


Ketua DPMU Kabupaten Wajo KKM "ALELEBBAE" Fasilitator Masyarakat Pelaksana Pamsimas

( MUH. TAUFIQ, ST ) ( ABDUL HAMID ) (GULBUDIN HEMATIAR, ST ) SAHARUDDIN


NIP : 19750717 2009 02 1003 Koordinator FM - WSS Ketua SATLAK
PROYEKSI KEBUTUHAN AIR BERSIH
DESA MARIO KECAMATAN TANA SITOLO

Tahun Proyeksi Ke n ANALISA PERHITUNGAN


No Uraian Satuan Tahun KETERANGAN
perenc.
5th 10th 15th KODE CARA HITUNG
1 Jumlah penduduk jiwa 523 569 619 673 1 rata2 kenaikan pertahun =1.7%
Pelayanan penduduk % 100 100 100 100 2 juklak 100% pelayanan
jiwa 523 569 619 673 3
2 Pelayanan SR % 100 100 100 100 4 juklak / survei
jiwa 523 569 619 673 5 (5)= ((4)*(3))/100
jiwa/sb 4 4 4 4 6 juklak
Jmlh. Sb 131 142 155 168 7 (7)= (5) / (6)
Pemakaian Air Lt/org/hr 60 60 60 60 8 juklak
Lt/sb/hr 240 240 240 240 9 (9)= (8) x (6)
Lt/det 0.36 0.40 0.43 0.47 10 (10)=(5)x(8)/86400
3 Pelayanan KU / HU % - - - - 11 (11)= 100 - (4)
jiwa - - - - 12 (12)=(11)/100*(3)
jiwa/HU 100 100 100 100 13 juklak
Jmlh. HU - - - - 14 (14)=(12)/(13)
Pemakaian Air Lt/org/hr 60 60 60 60 15 juklak
Lt/HU/hr 6,000 6,000 6,000 6,000 16 (16)=(13)*(15)
Lt/det - - - - 17 (17)=(12)*(15)/86400
4 Total Domestik Lt/det 0.36 0.40 0.43 0.47 18 (18)=(10)+(17)
5 Total Non Domestik % 0 0 0 0 19
Lt/det - - - - 20
6 Total Kebutuhan Air Lt/det 0.36 0.40 0.43 0.47 21 (21)=(18) + (20)
7 Kehilangan Air % 20 20 20 20 22 juklak
Lt/det 0.07 0.08 0.09 0.09 23 (23)=(21)*(22)/100
8 Kebutuhan Air
- Rata-rata Lt/det 0.44 0.47 0.52 0.56 24 (24)=(21)+ 23)
- Harian Puncak Faktor 1.1 1.1 1.1 1.1 25 juklak
Lt/det 0.48 0.52 0.57 0.62 26 (26)=(24)* (25)
M3/hari 1.73 1.88 2.04 2.22 27 (27)=(26)x3600/1000
M3/hari 41.42 45.06 49.03 53.34 28 (28)=(27)*24
- Jam Puncak Faktor 1.5 1.5 1.5 1.5 29 juklak (minimum)
Lt/det 0.65 0.71 0.77 0.84 30 (30)=(24)*(27)
9 Kebutuhan Air Baku Faktor 3.0 3.0 3.0 3.0 31 faktor keamanan
Lt/det 1.44 1.56 1.70 1.85 32 (32)=(26)*(33) Besarnya debit perencanaan
3X kebutuhan air baku
10 Volume Resevoir M 3
8.28 9.01 9.81 10.67 33 (30)=(0.2)*(28) Minimum 20% harian Maks
Kriteria perencanaan

PAMSIMAS 2011 RKM HID Desa Mattirowalie


PAMSIMAS 2011 RKM HID Desa Mattirowalie
TIME SCHEDULE PROGRAM PAMSIMAS

JUMLAH WAKTU PELAKSANAAN


NO URAIAN KEGIATAN HARGA BOBOT (%) BULAN I BULAN II BULAN III BULAN IV KETERANGAN
(RP) 1 2 3 4 1 2 3 4
1 PEKERJAAN SARANA AIR MINUM 149,812,800 90.94 100.00

PENGADAAN PIPA DAN ACCESSORIES 12,965,000 7.87 1.57 1.57 1.57 1.57 1.57
PEMASANGAN PIPA 8,266,000 5.02 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 90.00
AIR TANAH DALAM (BOR 6") 17,486,000 10.61 1.06 1.06 1.06 1.06 1.06 1.06 1.06 1.06 1.06 1.06
RESERVOAR ( 16 m³ ) 82,614,800 50.15 3.86 3.86 3.86 3.86 3.86 3.86 3.86 3.86 3.86 3.86 3.86 3.86 3.86
80.00
GARDU LISTRIK 10,309,000 6.26 1.56 1.56 1.56 1.56
LISTRIK PLN 3500 KVA 6,136,000 3.72 1.86 1.86
70.00
POMPA 9,850,000 5.98 1.49 1.49 1.49 1.49
2 PEMBANGUNAN SARANA CUCI TANGAN 7,408,000 4.50
Pembangunan sarana CTPS di sekolah 7,408,000 4.50 1.12 1.12 1.12 1.12 60.00
Pembangunan sarana CTPS di Pustu 7,408,000 4.50 1.12 1.12 1.12 1.12
3 KESEHATAN - - 50.00
MASYARAKAT - - 0.00 0.00 0.00 0.00 0.00 0.00
SEKOLAH - - 0.00 0.00 0.00 0.00 0.00
40.00
4 PEMBERDAYAAN 1,981,200 1.20
Pelatihan Teknik 396,180 0.24 0.24
Pelatihan Administrasi Keuangan 395,880 0.24 0.24 30.00
Pelatihan PHBS Masyarakat 396,380 0.24 0.24
Pelatihan Disabilitas 396,380 0.24 0.24 20.00
Pelatihan Kelompok Pengelola Sarana (KPSPAMS) 396,380 0.24 0.24
5 OPERASIONAL 5,532,000 3.36
10.00
ATK 2,766,000 1.68 0.84 0.84
Transportasi 2,766,000 1.68 0.42 0.42 0.42 0.42
0.00
TOTAL 164,734,000 100.00 2.22 1.06 4.92 6.49 6.91 6.49 8.49 10.05 12.36 12.59 10.73 6.61 4.78 4.36 4.36 0.74
RENCANA 2.22 1.06 4.92 6.49 6.91 6.49 8.49 10.05 12.36 12.59 10.73 6.61 4.78 4.36 4.36 0.74
KOMULATIF RENCANA 2.22 3.28 8.20 14.70 21.61 28.10 36.59 46.65 59.00 71.59 82.32 88.93 93.71 98.07 102.43 103.17
REALISASI
KOMULATIF REALISASI
DAFTAR HARGA BAHAN TAHUN 2019
PROGRAM PENYEDIAAN AIR MINUM DAN SANITASI BERBASIS MASYARAKAT

KEGIATAN : Pamsimas
DESA : Palipu
KECAMATAN : Tanasitolo
KABUPATEN : Wajo

HARGA
NO. JENIS BAHAN SAT. KETERANGAN
STANDARD (Rp.)
1 2 3 4 5
BAHAN DASAR
1 Batu Kali M³ Rp. 395,000.00
2 Batu Gunung M³ Rp. 395,000.00
3 Pasir Pasangan M³ Rp. 242,000.00
4 Pasir Beton M³ Rp. 306,000.00
5 Pasir Timbunan M³ Rp. 242,000.00
6 Batu pecah 1/2 cm (split) M³ Rp. 613,000.00
7 Batu pecah 2/3 cm M³ Rp. 591,000.00
8 Batu pecah 3/5 cm M³ Rp. 505,000.00
9 Semen Portland (PC) Kg Rp. 1,340.00

BAHAN DINDING
1 Batu Merah Bh Rp. 1,000.00
2 Rooster Bh Rp. 40,000.00

BAHAN LANTAI
1 Keramik 20 x 20 cm M² Rp -
2 Keramik 30 x 30 cm M² Rp -

1 Balok Kls. I M³ Rp. 6,000,000.00


2 Papan Kls. I M³ Rp. 7,000,000.00
3 Balok Kls. II 5/7 Btg Rp. 52,000.00
4 Balok Kls. II 5/7 M³ Rp. 3,682,000.00
5 Papan Kls. II 3/20 M³ Rp. 1,902,000.00
6 Balok Kls. III 5/7 M³ Rp. 2,800,000.00
7 Balok Kls. III 5/7 Btg Rp. 45,000.00
8 Papan Kls. III 3/20 M³ Rp. 3,244,000.00
9 Kayu Perancah M³ Rp. 1,800,000.00
10 Tripleks 9 mm uk. 120 x 240 cm Lbr Rp. 110,000.00
11 Tripleks 6 mm Lbr Rp. 80,000.00
12 Tripleks 3 mm Lbr Rp. 67,000.00
13 Bambu Btg Rp. 31,000.00

BAHAN KACA
1 Kaca Bening 5 mm M²

BAHAN BESI
1 - Besi Beton Polos Ø 6 mm Btg Rp. 49,000.00 SNI 12 mtr
HARGA
NO. JENIS BAHAN SAT. KETERANGAN
STANDARD (Rp.)
1 2 3 4 5
Kg Rp. 18,560.61
2 - Besi Beton Polos Ø 8 mm Btg Rp. 75,000.00 SNI 12 mtr
Kg Rp. 15,822.78
3 - Besi Beton Polos Ø 10 mm Btg Rp. 117,000.00 SNI 12 mtr
Kg Rp. 15,802.27
4 - Besi Beton Polos Ø 12 mm Btg Rp. 169,000.00 SNI 12 mtr
Kg Rp. 15,859.61
5 - Besi Beton Polos Ø 14 mm Btg Rp. 230,000.00 SNI 12 mtr
Kg Rp. 15,840.22
6 - Besi Beton Polos Ø 16 mm Btg Rp. 300,000.00 SNI 12 mtr
Kg Rp. 15,822.78
7 Paku Biasa Kg Rp. 22,000.00
8 Paku Seng (Payung) RRT Kg Rp. 22,000.00
9 Kawat Beton Kg Rp. 23,000.00
10 Kawat Beronjong Bh Rp -
10 Besi Strep 30.30.3 Kg Rp. 100,000.00
BAHAN ATAP
1 Seng Gelombang Kecil Kaki Rp. 53,000.00
2 Seng Gelombang Besar Kaki Rp. 53,000.00
3 PENUTUp Man Hole Besi Plat 60 x 60 Rp. 1,113,000.00
4 Penutup Man Hole Besi Plat 80 x 80 LS Rp. 1,335,000.00
BAHAN PENGGANTUNG
1 Penggantung
- Grendel - Kecil (uk. 2") Bh Rp. 15,000.00
- Engsel Pintu Bh Rp. 39,000.00
- Gembok Bh Rp. 35,000.00

BAHAN PINTU
1 Kusen Pintu Kayu Bh Rp. 668,000.00
2 Kusen Jendela Kayu Bh Rp. 200,000.00
3 Daun Pintu Kayu Bh Rp. 757,000.00
4 Kunci Tanam Bh Rp. 223,000.00
5 Engsel Kupu-kupu Bh Rp. 39,000.00
6 Pintu Fiber Bh Rp. 400,000.00
7 Kaca 5 mm M2 Rp. 125,000.00
#REF! Rp. 7,000,000.00
BAHAN SANITER (SANITASI)
1 Kran Air 1/2" Bh Rp. 15,000.00
2 Kran Air 3/4" Bh Rp. 20,000.00
3 Stop Kran 3/4" Bh Rp. 35,000.00
4 Seal Tape Bh Rp. 5,000.00
5 Floor Drain Bh Rp. 35,000.00
6 Wastafel Tunggal Bh Rp. 200,000.00

BAHAN FINISHING
1 Cat Tembok Kg Rp. 105,000.00
2 Cat Kayu Kg Rp. 58,000.00
3 Cat Besi Kg Rp. 36,000.00
HARGA
NO. JENIS BAHAN SAT. KETERANGAN
STANDARD (Rp.)
1 2 3 4 5
4 Cat Water Silky Kg Rp. 40,000.00
5 Plamur Kg Rp. 9,000.00
6 Cat Meni Besi Kg Rp. 47,000.00
7 Cat Meni Kayu Kg Rp. 47,000.00

ALAT
1 Sewa Molen Hari Rp. 650,000.00
2 Gerobak Dorong Bh Rp. 470,000.00
3 Sekop Bh Rp. 50,000.00
4 Linggis Bh Rp. 50,000.00
5 Sendok Semen Bh Rp. 25,000.00
6 Ember Cor Bh Rp. 10,000.00
7 Cangkul Bh Rp. 65,000.00
8 Kuas Cat Besar Bh Rp. 12,000.00
9 Kuas Cat Kecil Bh Rp. 4,000.00
10 Gergaji Besi Bh Rp. 50,000.00
11 Mata Gergaji Bh Rp. 10,000.00
12 Kunci Pipa Gip . 1/2" - 3" Bh Rp. 305,000.00
13 Kunci Pipa Gip . 3" - 4" Bh Rp. 387,000.00
14 Sney Pipa Ø 1/2" - 2 1/2" Bh Rp. 1,300,000.00
15 Sney Pipa Ø 3" - 4" Bh Rp. 1,600,000.00
16 Tangga Monyet Pipa GIP Ø ¾" LS Rp. 2,000,000.00
BAHAN PIPA PVC
1 Pipa PVC S-12.5 Ø 90 - 3" Btg Rp. 265,000.00 6 mtr SNI 12,5 Bar
2 Pipa PVC AW Ø 90 - 3" Btg Rp - 4 mtr AW
3 Pipa PVC S-12.5 Ø 63 - 2" Btg Rp. 120,000.00 6 mtr SNI 12,5 Bar
4 Pipa PVC AW Ø 63 - 2" Btg Rp - 4 mtr AW
5 Pipa PVC S-12,5 Ø 50 - 1 1/2" Btg Rp. 95,000.00 6 mtr SNI
6 Pipa PVC AW Ø 50 - 1 1/2" Btg Rp. 80,000.00 4 mtr AW
7 Pipa PVC S-10 Ø 32 - 1" Btg Rp. 35,000.00 6 mtr SNI
8 Pipa PVC AW Ø 32 - 1" Btg Rp - 6 mtr SNI
9 Pipa PVC Ø 25 - 3/4" Btg Rp. 17,500.00 4 mtr SNI
10 Socked Ø 3" Bh Rp. 35,000.00 SNI
11 Sock Drat Luar Ø 3" Bh Rp. 85,000.00 SNI
12 Sock Drat Dalam Ø 3" Bh Rp. 85,000.00 SNI
13 Sock Drat Luar Ø 2" Bh Rp. 38,000.00 SNI
14 Sock Drat Dalam Ø 2" Bh Rp. 38,000.00 SNI
15 Sock Drat Luar Ø 1 1/2" Bh Rp. 15,000.00 SNI
16 Sock Drat Luar Ø 1" Bh Rp. 7,000.00 SNI
17 Sock Drat Luar Ø 3/4 Bh Rp. 6,000.00 SNI
18 Sock Drat Dalam Ø 3/4 Bh Rp. 6,000.00 SNI
19 Knee PVC Ø 3" Bh Rp. 104,000.00 SNI
20 Knee PVC Ø 2" Bh Rp. 32,000.00 SNI
21 Knee PVC Ø 1 ½" Bh Rp. 17,500.00 SNI
22 Knee PVC Ø 1 ¼" Bh Rp - SNI
23 Knee PVC Ø 2" AW Bh Rp - AW
24 Sambungan Tee Ø 3" Bh Rp. 100,000.00 SNI
25 Sambungan Tee Ø 2" Bh Rp. 50,000.00 SNI
HARGA
NO. JENIS BAHAN SAT. KETERANGAN
STANDARD (Rp.)
1 2 3 4 5
26 Sambungan Tee Ø1 ½" Bh Rp. 20,000.00 SNI
27 Sambungan Tee Ø 3" x 2" x 3" Bh Rp. 140,000.00 SNI
28 Sambungan Tee Ø 2" x Ø 1½" x 2" Bh Rp. 70,000.00 SNI
29 Sambungan Tee Ø 2" AW Bh Rp - AW
30 Reducer Ø 3" x Ø 2" Bh Rp. 40,000.00 SNI
31 Reducer Ø 3" x Ø 1 ½" Bh Rp. 35,000.00 SNI
32 Reducer Ø 2" x Ø 1 ½" Bh Rp. 30,000.00 SNI
33 Cap Ø 6" AW Bh Rp. 120,000.00 AW
34 Cap Ø 3" Bh Rp. 80,000.00 SNI
35 Cap Ø 2" Bh Rp. 60,000.00 SNI
36 Cap Ø1 ½" Bh Rp. 12,000.00 SNI
37 Cap Ø1" Bh Rp. 8,000.00 SNI
38 Gate Valve PVC Ø 3" Bh Rp. 300,000.00 SNI
39 Gate Valve PVC Ø 2" Bh Rp. 85,000.00 SNI
40 Gate Valve PVC Ø 1 ½" Bh Rp. 55,000.00 SNI
41 Gate Valve PVC Ø 1 ¼" Bh Rp. 40,000.00 SNI
42 Lem Pipa (Solvent Cement PVC) Kaleng Rp. 45,000.00
BAHAN PIPA GALVANIS
1 Pipa galvanis medium A Ø 3" Btg Rp. 1,200,000.00
2 Pipa galvanis medium A Ø 2" Btg Rp. 720,000.00
3 Pipa galvanis medium A Ø 1 ½" Btg Rp. 527,000.00
4 Pipa galvanis medium A Ø 1" Btg Rp. 348,000.00
5 Pipa galvanis medium A Ø 3/4" Btg Rp. 227,000.00
6 Socked Ø 3" Bh Rp. 103,000.00
7 Socked Ø 2" Bh Rp. 43,000.00
8 Socked Ø 1 1/2" Bh Rp. 37,000.00
9 Socked Ø 1" Bh Rp. 18,000.00
10 Socked Ø 3/4" Bh Rp. 11,000.00
11 Long Bend 90° Ø 3" Bh Rp -
12 Knee GIP 90° Ø 3" Bh Rp. 156,000.00
13 Long Bend 90° Ø 2" Bh Rp -
14 Knee GIP 90° Ø 2" Bh Rp. 56,000.00
15 Long Bend 90° Ø1 ½" Bh Rp -
16 Knee GIP 90° Ø1 ½" Bh Rp. 40,000.00
17 Long Bend 90° Ø 1" Bh Rp -
18 Knee GIP 90° Ø1" Bh Rp. 20,000.00
19 Knee/Bend 45° Ø 3" Bh Rp. 200,000.00
20 Knee/Bend 45° Ø 2" Bh Rp. 106,000.00
21 Knee/Bend 45° Ø1 ½" Bh Rp. 56,000.00
22 Long Bend 45° Ø 1" Bh Rp -
23 Knee / Bend 90° Ø 3/4" Bh Rp -
24 Sambungan Tee Ø 2" Bh Rp. 87,000.00
25 Sambungan Tee Ø 3" Bh Rp. 218,000.00
26 Sambungan Tee Ø 1 1/2" Bh Rp. 56,000.00
27 Sambungan Tee Ø 1" Bh Rp. 31,000.00
28 Sambungan Tee Ø 1 " Bh Rp. 31,000.00
29 Sambungan Tee Ø 1 1/2" x Ø 1" Bh Rp. 68,000.00
30 Sambungan Tee Ø 2", Ø1 1/2" x Ø2" Bh Rp. 70,000.00
31 Cap Ø1" Bh Rp. 18,000.00
HARGA
NO. JENIS BAHAN SAT. KETERANGAN
STANDARD (Rp.)
1 2 3 4 5
32 Cap Ø 1 ½" Bh Rp. 28,000.00
33 Cap Ø 2 " Bh Rp. 30,000.00
34 Gate Valve Ø 3" Bh Rp. 1,335,000.00
35 Gate Valve GIP Ø 2" Bh Rp. 493,000.00
36 Gate Valve GIP Ø 1 ½" Bh Rp. 300,000.00
37 Gate Valve GIP Ø 1" Bh Rp. 168,000.00
38 Double Nepple Ø 3" Bh Rp. 112,000.00
39 Double Nepple Ø 2" Bh Rp. 50,000.00
40 Double Nepple Ø 1 1/2" Bh Rp. 37,000.00
41 Double Nepple Ø 1" Bh Rp. 18,000.00
42 Double Nepple Ø 3/4" Bh Rp. 12,000.00
43 Clamp Sadle Ø 3" x 3/4" Bh Rp. 75,000.00
44 Clamp Sadle Ø 2" x 3/4" Bh Rp. 40,000.00
45 Clamp Sadle Ø 1 1/2" x 3/4" Bh Rp. 34,000.00
46 Air Valve (Pentil Udara) Ø 3/4" Bh Rp. 150,000.00
47 Check Valve Ø 3" Bh Rp. 1,120,000.00
48 Check Valve Ø 2" Bh Rp. 650,000.00
49 Check Valve Ø 1 ½" Bh Rp. 350,000.00
50 Watermur/Union GIP Ø 3" Bh Rp. 290,000.00
51 Watermur/Union GIP Ø 2" Bh Rp. 200,000.00
52 Watermur/Union GIP Ø 1 ½" Bh Rp. 81,000.00
53 Watermur/Union GIP Ø 1" Bh Rp. 62,000.00
54 Meteran Air Bh Rp. 150,000.00

DAFTAR UPAH KERJA

HRG. STANDARD
NO. UPAH KERJA SAT. KET.
(Rp.)
1 2 3 4 5
1 Pekerja Org / Hr Rp. 100,000.00
2 Tukang Org / Hr Rp. 120,000.00
RENCANA ANGGARAN BIAYA
Provinsi/Kabupaten-Kota/Kecamatan/Desa : Sulawesi Selatan/Wajo/Pitumpanua/Kompong
Nomor RAB : Sub pekerjaan/Kegiatan :
Pekerjaan Kegiatan : Sarana Air Minum Ukuran/Dimensi :

Volume Harga Biaya (Rp


URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN APBDES Total
inCash inKind Rp inCash
1 2=3+4+5 3 4 5 6 7 8 9=2x8 10=3x8
1 BAHAN
A. PEKERJAAN PENDAHULUAN
1.1 Pek. Pemasangan Bowplank 4.00
- Balok Kayu klas III uk. 5/7 0.048 0.048 - m³ 2,800,000 134,400 -
- Paku biasa 2" - 5" 0.080 - 0.080 - Kg 22,000 1,760 -
- Papan Kayu Kls.III 3/20 0.028 0.028 - m³ 3,244,000 90,832 -
B. PEKERJAAN TANAH
2.1 Pek. Urugan Pasir dibawah Pondasi 0.195
- Pasir urug 0.234 0.234 - m³ 242,000 56,628 -
2.2 Pek. Urugan Pasir dibawah Lantai 0.204
- Pasir urug 0.245 0.245 - m³ 242,000 59,242 -
C. PEKERJAAN PONDASI BATU GUNUNG
3.1 Pas. Batu Kosong (anstamping) 0.780
- Batu belah 15/20 cm 0.936 - 0.936 - m³ 395,000 369,720 -
- Pasir urug 0.337 - 0.337 - m³ 242,000 81,544 -
3.2 Pas. Pondasi Batu Belah (1 : 3) 1.050
- Batu belah 10/15 cm 1.260 - 1.260 - M³ 395,000 497,700 -
- Semen Portland 211.862 - 211.862 - Kg 1,340 283,895 -
- Pasir pasang 0.509 - 0.509 - M³ 306,000 155,831 -
D. PEKERJAAN BETON
4.1 Pek. Rabat Beron t. 5 cm
* Beton 0.102
- Semen portland 23.460 23.460 - Kg 1,340 31,436 -
- Pasir Beton 0.065 0.065 - m³ 306,000 19,909 -
- Batu pecah 2/3/4 cm 0.078 0.078 - m³ 591,000 45,859 -
4.2 Pek. Kolom
* Beton 0.270
- Semen portland 88.020 88.020 - Kg 1,340 117,947 -
- Pasir Beton 0.147 0.147 - m³ 591,000 86,624 -
- Batu pecah 2/3 cm 0.206 0.206 - m³ 591,000 121,628
* Pembesian 19.728
- Besi beton Polos Ø 10 16.054 16.054 - Kg 15,802 253,684 -
- Besi beton Polos Ø 6 4.661 4.661 - Kg 18,561 86,506 -
- Kawat beton 0.296 0.296 - Kg 23,000 6,806 -
* Bekisting 1.800
- Papan Kayu Kls.III 3/20 0.072 0.072 - m³ 3,244,000 233,568 -
- Paku biasa 2" - 5' 0.720 0.720 - Kg 22,000 15,840 -
- Balok Kayu klas III uk. 5/7 0.027 0.027 - m³ 2,800,000 75,600 -
- Tripleks 9 mm 0.630 0.630 - Lbr 110,000 69,300 -
- Bambu 3.600 3.600 - Btg 31,000 111,600 -
Volume Harga Biaya (Rp
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN APBDES Total
inCash inKind Rp inCash
1 2=3+4+5 3 4 5 6 7 8 9=2x8 10=3x8
4.3 Pek. Sloef 15 x 15
* Beton 0.270
- Semen portland 0.022 0.022 - Kg 1,340 29 -
- Pasir Beton 0.002 0.002 - m³ 306,000 496 -
- Batu pecah 2/3 cm 0.002 0.002 - m³ 591,000 1,436 -
* Pembesian 19.481
- Besi beton Polos Ø 10 15.795 15.795 - Kg 15,802 249,593 -
- Besi beton Polos Ø 6 4.661 4.661 - Kg 18,561 86,506 -
- Kawat beton 0.292 0.292 - Kg 23,000 6,721 -
* Bekisting 0.900
- Papan Kayu Kls.III 3/20 0.036 0.036 - m³ 3,244,000 116,784 -
- Paku biasa 2" - 5' 0.360 0.360 - Kg 22,000 7,920 -
- Balok Kayu klas III uk. 5/7 0.014 0.014 - m³ 2,800,000 37,800 -
- Tripleks 9 mm 0.315 0.315 - Lbr 110,000 34,650 -
- Bambu 1.800 1.800 - Btg 31,000 55,800 -
4.4 Pek. Plat Atap t. 12 cm
* Beton 1.037
- Semen portland 338.055 338.055 - Kg 1,340 452,994 -
- Pasir Beton 0.563 0.563 - m³ 306,000 172,257 -
- Batu pecah 2/3 cm 0.790 0.790 - m³ 591,000 467,132 -
* Pembesian 39.324
- Besi beton Polos Ø 10 41.291 41.291 - Kg 15,802 652,487 -
- Kawat beton 0.590 0.590 - Kg 23,000 13,567 -
* Bekisting 2.850
- Papan Kayu Kls.III 3/20 0.114 0.114 - m³ 3,244,000 369,764 -
- Paku biasa 2" - 5' 1.140 1.140 - Kg 22,000 25,076 -
- Balok Kayu klas III uk. 5/7 0.043 0.043 - m³ 2,800,000 119,683 -
- Tripleks 9 mm - - - Lbr 110,000 - -
- Bambu 5.699 5.699 - Btg 31,000 176,675 -
4.5 Pek. Ringbalk 15 x 15
* Beton 0.270
- Semen portland 88.020 88.020 - Kg 1,340 117,947 -
- Pasir Beton 0.147 0.147 - m³ 306,000 44,851 -
- Batu pecah 2/3/4 cm 0.206 0.206 - m³ 591,000 121,628 -
* Pembesian 19.481
- Besi beton Polos Ø 10 15.795 15.795 - Kg 15,802 249,593 -
- Besi beton Polos Ø 6 4.661 4.661 - Kg 18,561 86,506 -
- Kawat beton 0.292 0.292 - Kg 23,000 6,721 -
* Bekisting 0.900
- Papan Kayu Kls.III 3/20 0.036 0.036 - m³ 3,244,000 116,784 -
- Paku biasa 2" - 5' 0.360 0.360 - Kg 22,000 7,920 -
- Balok Kayu klas III uk. 5/7 0.016 0.016 - m³ 2,800,000 45,360 -
- Tripleks 9 mm 0.315 0.315 - Lbr 110,000 34,650 -
- Bambu 1.789 1.789 - Btg 31,000 55,455 -
Volume Harga Biaya (Rp
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN APBDES Total
inCash inKind Rp inCash
1 2=3+4+5 3 4 5 6 7 8 9=2x8 10=3x8
E. PEKERJAAN DINDING
5.1 Pas.Batu Merah 1/2 (1:2) 18.450
- Bata merah 1,291.500 1,291.500 - Bh 1,000 1,291,500 -
- Semen Portland 349.628 349.628 - Kg 1,340 468,501 -
- Pasir pasang 0.701 0.701 - m³ 242,000 169,666 -
F. PEKERJAAN PINTU
6.1 Pekerjaan Pintu dan Jendela
- Kusen Pintu 1.000 1.000 - Bh 668,000 668,000 -
- Daun Pintu 1.000 1.000 - Bh 757,000 757,000 -
- Engsel Kupu kupu 3.000 3.000 - Bh 39,000 117,000 -
- Kunci Tanam 1.000 1.000 - Bh 223,000 223,000 -
6.2 Pengecatan Bidang Kayu baru 1.520
- Cat meni 0.304 0.304 - Kg 47,000 14,288 -
- Plamir Kayu 0.228 0.228 - Kg 58,000 13,224 -
- Cat dasar 0.258 0.258 - Kg 58,000 14,987 -
- Cat penutup 2 kali 0.395 0.395 - Kg - -
G. PEKERJAAN FINISHING
7.1 Pek. Plesteran 1:2 36.900
- Semen Portland 503.021 503.021 - Kg 1,340 674,048 -
- Pasir pasang 0.996 0.996 - m³ 242,000 241,105 -
7.2 Pek. Acian 36.900
- Semen Portland 119.925 119.925 - Kg 1,340 160,700 -
7.3 Pek. Pengecatan 36.900
- Plamir tembok 3.690 3.690 - Kg 9,000 33,210 -
- Cat dasar 1 kali 3.690 3.690 - Kg 105,000 387,450 -
- Cat penutup 2 kali 9.594 9.594 - Kg 105,000 1,007,370 -

Sub Total 1) 13,183,692 -


Dibulatkan 13,184,000 -
2 UPAH
A. PEKERJAAN PENDAHULUAN
1.1 Membersihkan Lapangan dan Peralatan 4.00
- Pekerja 0.400 - 0.400 - Hok 100,000 40,000 -
1.2 Pemasangan Bowplank 4.000
- Pekerja 0.400 - 0.400 - Hok 100,000 40,000 -
- Tukang 0.400 - 0.400 - Hok 120,000 48,000 -
B. PEKERJAAN TANAH
2.1 Pek. Galian Pondasi 2.145
- Pekerja 1.609 - 1.609 - Hok 100,000 160,875 -
2.2 Pek. Urugan Pasir dibawah Pondasi 0.195
- Pekerja 0.059 - 0.059 - Hok 100,000 5,850 -
2.3 Pek. Urugan Pasir dibawah Lantai 0.204
- Pekerja 0.061 - 0.061 - Hok 100,000 6,120 -
2.4 Urugan Kembali 1.057
- Pekerja 0.264 - 0.264 - Hok 100,000 26,414 -
Volume Harga Biaya (Rp
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN APBDES Total
inCash inKind Rp inCash
1 2=3+4+5 3 4 5 6 7 8 9=2x8 10=3x8
C. PEKERJAAN PONDASI BATU GUNUNG
3.1 Pas. Batu Kosong (anstamping) 0.780
- Pekerja 0.608 - 0.608 - Hok 100,000 60,840 -
- Tukang 0.304 - 0.304 - Hok 120,000 36,504 -
3.2 Pas. Pondasi Batu Belah (1 : 3) 1.050
- Pekerja 1.575 - 1.575 - Hok 100,000 157,500 -
- Tukang 0.787 - 0.787 - Hok 120,000 94,394 -
D. PEKERJAAN BETON
4.1 Pek. Rabat Beron t. 5 cm
* Beton 0.102
- Pekerja 0.168 0.168 - Hok 100,000 16,830 -
- Tukang 0.028 0.028 - Hok 120,000 3,366 -
4.2 Pek. Kolom
* Beton 0.270
- Pekerja 0.049 - 0.049 - Hok 100,000 4,860 -
- Tukang 0.005 - 0.005 - Hok 120,000 648 -
* Pembesian 19.728
- Pekerja 0.138 - 0.138 - Hok 100,000 13,810 -
- Tukang 0.138 - 0.138 - Hok 120,000 16,572 -
* Bekisting 1.800
- Pekerja 1.188 - 1.188 - Hok 100,000 118,800 -
- Tukang 0.594 0.594 - Hok 120,000 71,280 -
4.3 Pek. Sloef 15 x 15
* Beton 0.270
- Pekerja 0.446 - 0.446 - Hok 100,000 44,550 -
- Tukang 0.074 - 0.074 - Hok 120,000 8,910 -
* Pembesian 19.481
- Pekerja 0.136 - 0.136 - Hok 100,000 13,637 -
- Tukang 0.136 0.136 - Hok 120,000 16,364 -
* Bekisting 0.900
- Pekerja 0.594 - 0.594 - Hok 100,000 59,400 -
- Tukang 0.297 0.297 - Hok 120,000 35,640 -
4.4 Pek. Plat Atap t. 12 cm
* Beton 1.037
- Pekerja 1.711 1.711 - Hok 100,000 171,102 -
- Tukang 0.285 0.285 - Hok 120,000 34,220 -
* Pembesian 39.324
- Pekerja 0.275 - 0.275 - Hok 100,000 27,527 -
- Tukang 0.275 0.275 - Hok 120,000 33,033 -
* Bekisting 2.850
- Pekerja 1.881 - 1.881 - Hok 100,000 188,074 -
- Tukang 0.470 0.470 - Hok 120,000 56,422 -
4.5 Pek. Ringbalk 15 x 15
* Beton 0.270
- Pekerja 0.446 - 0.446 - Hok 100,000 44,550 -
- Tukang 0.074 - 0.074 - Hok 120,000 8,910 -
Volume Harga Biaya (Rp
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN APBDES Total
inCash inKind Rp inCash
1 2=3+4+5 3 4 5 6 7 8 9=2x8 10=3x8
* Pembesian 19.481
- Pekerja 0.136 - 0.136 - Hok 100,000 13,637 -
- Tukang 0.136 0.136 - Hok 120,000 16,364 -
* Bekisting 0.900
- Pekerja 0.594 - 0.594 - Hok 100,000 59,400 -
- Tukang 0.297 0.297 - Hok 120,000 35,640 -
E. PEKERJAAN DINDING
5.1 Pas.Batu Merah 1/2 (1:2) 18.450
- Pekerja 5.535 - 5.535 - Hok 100,000 553,500 -
- Tukang 1.845 1.845 - Hok 120,000 221,400 -
F. PEKERJAAN PINTU DAN JENDELA
6.1 Pengecatan Bidang Kayu baru 1.520
- Pekerja 0.106 0.106 - Hok 100,000 10,640 -
- Tukang 0.014 0.014 - Hok 120,000 1,642 -
G. PEKERJAAN FINISHING
7.1 Pek. Plesteran 1:2 36.900
- Pekerja 14.760 - 14.760 Hok 100,000 1,476,000 -
- Tukang 7.380 - 7.380 Hok 120,000 885,600 -
7.2 Acian 36.900
- Pekerja 7.380 7.380 - Hok 100,000 738,000 -
- Tukang 3.690 3.690 - Hok 120,000 442,800 -
7.3 Pengecetan 36.900
- Pekerja 0.738 0.738 - Hok 100,000 73,800 -
- Tukang 2.325 2.325 - Hok 120,000 278,964 -
Sub Total 2) 6,472,388 -
Dibulatkan 6,472,300 -
Jumlah Total) 19,657,000 -

Alelebbae, Dese

Disetujui Oleh : Didampingi oleh : Dibuat Oleh :


Ketua DPMU Kabupaten Wajo KKM "ALELEBBAE" Fasilitator Masyarakat Pelaksana Pam

( MUH. TAUFIQ, ST ) (UNU) (GULBUDIN HEMATIAR, ST ) ( SAHARUDD


NIP : 19750717 2009 02 1003 Koordinator FM - WSS Ketua SATL
ANGGARAN BIAYA
sa : Sulawesi Selatan/Wajo/Pitumpanua/Kompong
RUMAH POMPA
1,5 x 1,5 m

Biaya (Rp)
Kontribusi Masyarakat
APBN APBDES
inKind
11=4x8 12=5x8 13=6x8

134,400 -
- 1,760 -
90,832 -

- 56,628 -

- 59,242 -

- 369,720 -
- 81,544 -

- 497,700 -
- 283,895 -
- 155,831 -

- 31,436 -
- 19,909 -
- 45,859 -

- 117,947 -
- 86,624 -
- 121,628 -

- 253,684 -
- 86,506 -
- 6,806 -

233,568 -
- 15,840 -
75,600 -
- 69,300 -
111,600 -
Biaya (Rp)
Kontribusi Masyarakat
APBN APBDES
inKind
11=4x8 12=5x8 13=6x8

- 29 -
- 496 -
- 1,436 -

- 249,593 -
- 86,506 -
- 6,721 -

116,784 -
- 7,920 -
37,800 -
- 34,650 -
55,800 -

- 452,994 -
- 172,257 -
- 467,132 -

- 652,487 -
- 13,567 -

369,764 -
- 25,076 -
119,683 -
- - -
176,675 -

- 117,947 -
- 44,851 -
- 121,628 -

- 249,593 -
- 86,506 -
- 6,721 -

116,784 -
- 7,920 -
45,360 -
- 34,650 -
55,455 -
Biaya (Rp)
Kontribusi Masyarakat
APBN APBDES
inKind
11=4x8 12=5x8 13=6x8

- 1,291,500 -
- 468,501 -
- 169,666 -

- 668,000 -
- 757,000 -
- 117,000 -
- 223,000 -

- 14,288 -
- 13,224 -
- 14,987 -
- - -

- 674,048 -
- 241,105 -

- 160,700 -

- 33,210 -
- 387,450 -
- 1,007,370 -

1,740,106 11,443,587 -
1,741,000 11,443,000 -

- 40,000 -

- 40,000 -
- 48,000 -

- 160,875 -

- 5,850 -

- 6,120 -

- 26,414 -
Biaya (Rp)
Kontribusi Masyarakat
APBN APBDES
inKind
11=4x8 12=5x8 13=6x8

- 60,840 -
- 36,504 -

- 157,500 -
- 94,394 -

16,830 -
3,366 -

- 4,860 -
- 648 -

- 13,810 -
- 16,572 -

- 118,800 -
- 71,280 -

- 44,550 -
- 8,910 -

- 13,637 -
- 16,364 -

- 59,400 -
- 35,640 -

171,102 -
34,220 -

- 27,527 -
- 33,033 -

- 188,074 -
- 56,422 -

- 44,550 -
- 8,910 -
Biaya (Rp)
Kontribusi Masyarakat
APBN APBDES
inKind
11=4x8 12=5x8 13=6x8

- 13,637 -
- 16,364 -

- 59,400 -
- 35,640 -

- 553,500 -
- 221,400 -

10,640 -
1,642 -

- 1,476,000 -
- 885,600 -

738,000 -
442,800 -

73,800 -
278,964 -
1,771,364 4,701,024 -
1,771,300 4,701,000 -
3,512,300 16,144,000 -

Alelebbae, Desember 2019

Pelaksana Pamsimas

( SAHARUDDIN )
Ketua SATLAK
RENCANA ANGGARAN BIAYA

Nomor RAB : Sub pekerjaan/Kegiatan : RUMAH POMPA


Pekerjaan Kegiatan : Sarana Air Minum Ukuran/Dimensi : 1,5 x 1,5 m

Volume Harga Biaya (Rp)


URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN APBDES Total APBN APBDES
inCash inKind Rp inCash inKind
1 2=3+4+5 3 4 5 6 7 8 9=2x8 10=3x8 11=4x8 12=5x8 13=6x8
1 BAHAN
A. PEKERJAAN PENDAHULUAN
1.1 Pek. Pemasangan Bowplank 4.00
- Balok Kayu klas III uk. 5/7 0.048 0.048 - m³ 2,800,000 134,400 - 134,400 -
- Paku biasa 2" - 5" 0.080 - 0.080 - Kg 22,000 1,760 - - 1,760 -
- Papan Kayu Kls.III 3/20 0.028 0.028 - m³ 3,244,000 90,832 - 90,832 -
B. PEKERJAAN TANAH
2.1 Pek. Urugan Pasir dibawah Pondasi 0.195
- Pasir urug - - m³ 242,000 - - - - -
2.2 Pek. Urugan Pasir dibawah Lantai 0.204
- Pasir urug 0.245 0.245 - m³ 242,000 59,242 - - 59,242 -
C. PEKERJAAN PONDASI BATU GUNUNG
3.1 Pas. Batu Kosong (anstamping) 0.780
- Batu belah 15/20 cm - - - m³ 395,000 - - - - -
- Pasir urug - - - m³ 242,000 - - - - -
3.2 Pas. Pondasi Batu Belah (1 : 3) 1.050
- Batu belah 10/15 cm - - - M³ 395,000 - - - - -
- Semen Portland - - - Kg 1,340 - - - - -
- Pasir pasang - - - M³ 242,000 - - - - -
D. PEKERJAAN BETON
4.1 Pek. Rabat Beron t. 5 cm
* Beton 0.102
- Semen portland 23.460 23.460 - Kg 1,340 31,436 - - 31,436 -
- Pasir Beton 0.065 0.065 - m³ 242,000 15,745 - - 15,745 -
- Batu pecah 2/3/4 cm 0.078 0.078 - m³ 505,000 39,186 - - 39,186 -
4.2 Pek. Kolom 8.400
- Kayu terentang 0.017 0.017 M3 1,800,000 30,240 30,240
- Paku biasa 2" - 5' 0.084 0.084 Kg 22,000 1,848 1,848
- Besi beton polos 25.200 25.200 Kg 15,802 398,217 398,217
- Kawat beton 3.780 3.780 Kg 23,000 86,940 86,940
- Semen portland 33.600 33.600 Kg 1,340 45,024 45,024
- Pasir beton 0.050 0.050 M3 306,000 15,422 15,422
- Koral beton 0.076 0.076 M3 591,000 44,680 44,680
4.3 Pek. Sloef 10 x 15 6.000
- Kayu terentang 0.018 0.018 M3 1,800,000 32,400 32,400
- Paku biasa 2" - 5' 0.120 0.120 Kg 22,000 2,640 2,640
- Besi beton polos 21.600 21.600 Kg 15,802 341,329 341,329
Kawat beton 0.300 0.300 Kg 23,000 6,900 6,900
Semen portland 33.000 33.000 Kg 1,340 44,220 44,220
Pasir beton 0.054 0.054 M3 306,000 16,524 16,524
Koral beton 0.090 0.090 M3 591,000 53,190 53,190
4.4 Pek. Plat Atap t. 10 cm
* Beton 0.100
- Semen portland 32.600 32.600 - Kg 1,340 43,684 - - 43,684 -
- Pasir Beton 0.054 0.054 - m³ 306,000 16,611 - - 16,611 -
- Batu pecah 2/3 cm 0.076 0.076 - m³ 591,000 45,047 - - 45,047 -
* Pembesian 39.324
- Besi beton Polos Ø 10 41.291 41.291 - Kg 15,802 652,487 - - 652,487 -
- Kawat beton 0.590 0.590 - Kg 23,000 13,567 - - 13,567 -
* Bekisting 2.850
- Papan Kayu Kls.III 3/20 0.114 0.114 - m³ 3,244,000 369,764 - 369,764 -
- Paku biasa 2" - 5' 1.140 1.140 - Kg 22,000 25,076 - - 25,076 -
- Balok Kayu klas III uk. 5/7 0.043 0.043 - m³ 3,244,000 138,662 - 138,662 -
- Tripleks 9 mm - - - Lbr 110,000 - - - - -
- Bambu 5.699 5.699 - Btg 31,000 176,675 - 176,675 -
E. PEKERJAAN DINDING
5.1 Pas.Batu Merah 1/2 (1:2) 10.155
- Bata merah 710.850 710.850 - Bh 1,000 710,850 - - 710,850 -
- Semen Portland 116.783 116.783 - Kg 1,340 156,489 - - 156,489 -
- Pasir pasang 0.437 0.437 - m³ 242,000 105,673 - - 105,673 -
F. PEKERJAAN PINTU
6.1 Pekerjaan Pintu dan Jendela
- Kusen Pintu 1.000 1.000 - Bh 668,000 668,000 - - 668,000 -
- Daun Pintu 1.000 1.000 - Bh 757,000 757,000 - - 757,000 -
- Engsel Kupu kupu 3.000 3.000 - Bh 39,000 117,000 - - 117,000 -
- Kunci Tanam 1.000 1.000 - Bh 223,000 223,000 - - 223,000 -
6.2 Pengecatan Bidang Kayu baru 1.520
- Cat meni 0.304 0.304 - Kg 47,000 14,288 - - 14,288 -
- Plamir Kayu 0.228 0.228 - Kg 58,000 13,224 - - 13,224 -
- Cat dasar 0.258 0.258 - Kg 58,000 14,987 - - 14,987 -
- Cat penutup 2 kali 0.395 0.395 - Kg 58,000 22,922 - - 22,922 -
G. PEKERJAAN FINISHING
7.1 Pek. Plesteran 1:4 20.310
- Semen Portland 168.979 168.979 - Kg 1,340 226,432 - - 226,432 -
- Pasir pasang 0.650 0.650 - m³ 242,000 157,281 - - 157,281 -
7.2 Pek. Acian 20.310
- Semen Portland 66.008 66.008 - Kg 1,340 88,450 - - 88,450 -
7.3 Pek. Pengecatan 20.310
- Plamir tembok 2.031 2.031 - Kg 9,000 18,279 - - 18,279 -
- Cat dasar 1 kali 2.031 2.031 - Kg 105,000 213,255 - - 213,255 -
- Cat penutup 2 kali 5.281 5.281 - Kg 105,000 554,463 - - 554,463 -
Sub Total 1) 7,035,341 - 910,333 6,125,008 -
Dibulatkan 7,036,000 - 911,000 6,125,000 -
2 UPAH
A. PEKERJAAN PENDAHULUAN
1.1 Membersihkan Lapangan dan Peralatan 4.00
- Pekerja 0.400 - 0.400 - Hok 100,000 40,000 - - 40,000 -
1.2 Pemasangan Bowplank 4.000
- Pekerja 0.400 - 0.400 - Hok 100,000 40,000 - - 40,000 -
- Tukang 0.400 - 0.400 - Hok 120,000 48,000 - - 48,000 -
B. PEKERJAAN TANAH
2.1 Pek. Galian Pondasi 2.145
- Pekerja - - - Hok 100,000 - - - - -
2.2 Pek. Urugan Pasir dibawah Pondasi 0.195
- Pekerja - - - Hok 100,000 - - - - -
2.3 Pek. Urugan Pasir dibawah Lantai 0.204
- Pekerja - - - Hok 100,000 - - - - -
2.4 Urugan Kembali 1.057
- Pekerja - - - Hok 100,000 - - - - -
C. PEKERJAAN PONDASI BATU GUNUNG
3.1 Pas. Batu Kosong (anstamping) 0.780
- Pekerja - - - Hok 100,000 - - - - -
- Tukang - - - Hok 120,000 - - - - -
3.2 Pas. Pondasi Batu Belah (1 : 3) 1.050
- Pekerja - - - Hok 100,000 - - - - -
- Tukang - - - Hok 120,000 - - - - -
D. PEKERJAAN BETON
4.1 Pek. Rabat Beron t. 5 cm
* Beton 0.102
- Pekerja 0.168 0.168 - Hok 90,000 15,147 - 15,147 -
- Tukang 0.028 0.028 - Hok 120,000 3,366 - 3,366 -
4.2 Pek. Kolom 8.400
- Pekerja 0.504 - 0.504 Hok 90,000 45,360 - - 45,360
- Tukang Batu 0.168 - 0.168 Hok 120,000 20,160 - - 20,160
Tukang Kayu 0.168 0.168 Hok 120,000 20,160 20,160
- Tukang Besi 0.168 0.168 Hok 120,000 20,160 20,160
4.3 Pek. Sloef 10 x 15 6.000
- Pekerja 0.600 0.600 Hok 90,000 54,000 - - 54,000
- Tukang Batu 0.198 0.198 Hok 120,000 23,760 - - 23,760
- Tukang Kayu 0.198 0.198 Hok 120,000 23,760 - - 23,760
- Tukang Besi 0.198 0.198 Hok 120,000 23,760 - - 23,760
4.4 Pek. Plat Atap t. 10 cm
* Beton 1.037
- Pekerja 1.711 1.711 - Hok 90,000 153,992 - 153,992 -
- Tukang 0.285 0.285 - Hok 120,000 34,220 - 34,220 -
* Pembesian 39.324
- Pekerja 0.275 - 0.275 - Hok 90,000 24,774 - 24,774 -
- Tukang 0.275 0.275 - Hok 120,000 33,033 - - 33,033 -
* Bekisting 2.850
- Pekerja 1.881 - 1.881 - Hok 90,000 169,266 - - 169,266 -
- Tukang 0.470 0.470 - Hok 120,000 56,422 - - 56,422 -
E. PEKERJAAN DINDING
5.1 Pas.Batu Merah 1/2 (1:2) 10.155
- Pekerja 3.047 3.047 - Hok 90,000 274,185 - 274,185 -
- Tukang 1.016 1.016 - Hok 120,000 121,860 - - 121,860 -
F. PEKERJAAN PINTU DAN JENDELA
6.1 Pengecatan Bidang Kayu baru 1.520
- Pekerja 0.106 0.106 - Hok 90,000 9,576 - 9,576 -
- Tukang 0.006 0.006 - Hok 120,000 730 - 730 -
G. PEKERJAAN FINISHING
7.1 Pek. Plesteran 1:4 20.310
- Pekerja 8.124 8.124 Hok 90,000 731,160 - 731,160 -
- Tukang 4.062 - 4.062 Hok 120,000 487,440 - - 487,440 -
7.2 Acian 20.310
- Pekerja 4.062 4.062 - Hok 90,000 365,580 - 365,580 -
- Tukang 2.031 2.031 - Hok 120,000 243,720 - 243,720 -
7.3 Pengecetan 20.310
- Pekerja 0.406 0.406 - Hok 90,000 36,558 - 36,558 -
- Tukang 1.280 1.280 - Hok 120,000 153,544 - 153,544 -
Sub Total 2) 3,273,692 - 1,926,276 1,347,417 -
Dibulatkan 3,273,000 - 1,926,000 1,347,000 -
Jumlah Total) 10,309,000 - 2,837,000 7,472,000 -

Palippu, Juni 2020

Disetujui Oleh : Didampingi oleh : Dibuat Oleh :


Ketua DPMU Kabupaten Wajo KKM "PUNCAK" Fasilitator Masyarakat Pelaksana Pamsimas

( MUH. TAUFIQ, ST ) ( ABDUL HAMID ) (GULBUDIN HEMATIAR, ST ) ( MUH. YAHYA)


NIP : 19750717 2009 02 1003 Koordinator FM - WSS Ketua SATLAK
RENCANA ANGGARAN BIAYA (RAB)

NAMA KEGIATAN : PENYEDIAAN AIR MINUM & SANITASI BERBASIS MASYARAKAT (PAMSIMAS)
PEKERJAAN : PEMBANGUNAN SARANA AIR BERSIH MASYARAKAT
SUB PEKERJAAN : PEMBANGUNAN SANITASI SEKOLAH
DESA
KECAMATAN
KABUPATEN

Volume Biaya (Rp)


No URAIAN Kontribusi Masy. Satuan Harga Satuan Rp Kontribusi Masyarakat
Total APBN Total APBN
inCash inKind inCash inKind HOK
1 2 3=4+5+6 4 5 6 7 8 9=3x8 10=4x8 11=5x8 12 13=6x8
A. SANITASI SEKOLAH
1 Pekerjaan Persiapan 1.000 150,000.00 150,000.00 - -
1.1 Pembersihan Lahan 1.000 1.000 1.000 Ls 150,000.00 150,000.00 150,000.00

2 Pemasangan Bouplank 14.000 M' 1,250,648.00 1,250,648.00 - -


2.1 Tenaga Kerja
Pekerja 1.400 1.400 O/H 100,000.00 140,000.00 140,000.00
Tukang Kayu 1.400 1.400 O/H 120,000.00 168,000.00 168,000.00
2.2 Bahan
Kayu Klas II uk. 5/7 0.168 0.168 M3 3,682,000.00 618,576.00 618,576.00
Paku biasa 2" - 5" 0.280 0.280 Kg 22,000.00 6,160.00 6,160.00
Kayu papan 3/20 0.098 0.098 M3 3,244,000.00 317,912.00 317,912.00

3 Galian Tanah Biasa 1.739 M3 69,552.00 - 0.696 69,552.00


3.1 Tenaga Kerja
Pekerja 0.696 0.696 O/H 100,000.00 69,552.00 0.696 69,552.00

4 Urugan Tanah Kembali 0.869 M3 - - - -


4.1 Tenaga Kerja
Pekerja 0.167 O/H 100,000.00 - - -

5 Urugan Pasir 0.688 M3 220,435.00 220,435.00 0.206 220,435.00


5.1 Tenaga Kerja
Pekerja 0.206 0.206 O/H 100,000.00 20,640.00 0.206 20,640.00
5.2 Bahan
Pasir Urug 0.826 0.826 M3 242,000.00 199,795.00 199,795.00
7 Pek. Lantai Beton 1 Pc : 3 Psr : 5 Kr 1.016 1,146,688.08
8.1 Tenaga Kerja
Pekerja 1.676 1.676 O/H 100,000.00 167,640.00 167,640.00
Tukang Batu 0.254 0.254 O/H 120,000.00 30,480.00 30,480.00
8.2 Bahan -
Semen Portland 182.880 182.880 Kg 1,340.00 245,059.20 245,059.20
Pasir beton 0.528 0.528 M3 306,000.00 161,665.92 161,665.92
Koral beton 0.884 0.884 M3 613,000.00 541,842.96 541,842.96

8 Ring Balok (10x15) 4.000 M3 432,604.00 - 0.796 432,604.00


8.1 Tenaga Kerja
Pekerja 0.400 0.400 O/H 100,000.00 40,000.00 0.400 40,000.00
Tukang Batu 0.132 0.132 O/H 120,000.00 15,840.00 0.132 15,840.00
Tukang Kayu 0.132 0.132 O/H 120,000.00 15,840.00 0.132 15,840.00
Tukang Besi 0.132 0.132 O/H 120,000.00 15,840.00 0.132 15,840.00
8.2 Bahan
Kayu terentang 0.012 0.012 M3 2,800,000.00 33,600.00 33,600.00
Paku biasa 2" - 5' 0.080 0.080 Kg 22,000.00 1,760.00 1,760.00
Besi beton polos 14.400 14.400 Kg 15,822.78 227,848.00 227,848.00
Kawat beton 0.200 0.200 Kg 23,000.00 4,600.00 4,600.00
Semen portland 22.000 22.000 Kg 1,340.00 29,480.00 29,480.00
Pasir beton 0.036 0.036 M3 306,000.00 11,016.00 11,016.00
Koral beton 0.060 0.060 M3 613,000.00 36,780.00 36,780.00

9 Kolom Praktis (11x11) 2.400 M3 213,842.00 - 0.288 213,314.00


9.1 Tenaga Kerja
Pekerja 0.144 0.144 O/H 100,000.00 14,400.00 0.144 14,400.00
Tukang Batu 0.048 0.048 O/H 120,000.00 5,760.00 0.048 5,760.00
Tukang Kayu 0.048 0.048 O/H 120,000.00 5,760.00 0.048 5,760.00
Tukang Besi 0.048 0.048 O/H 120,000.00 5,760.00 0.048 5,760.00
9.2 Bahan
Kayu terentang 0.005 0.005 M3 2,800,000.00 13,440.00 13,440.00
Paku biasa 2" - 5' 0.024 0.024 Kg 22,000.00 528.00
Besi beton polos 7.200 7.200 Kg 15,822.78 113,924.00 113,924.00
Kawat beton 1.080 1.080 Kg 22,000.00 23,760.00 23,760.00
Semen portland 9.600 9.600 Kg 1,340.00 12,864.00 12,864.00
Pasir beton 0.014 0.014 M3 306,000.00 4,406.00 4,406.00
Koral beton 0.022 0.022 M3 613,000.00 13,240.00 13,240.00
10 Pasangan Batu Bata, 1/2 Bata 1:3 1.566 M2 223,836.00 - 0.658 223,836.00
10.1 Tenaga Kerja
Pekerja 0.501 0.501 O/H 100,000.00 50,112.00 0.501 50,112.00
Tukang Batu 0.157 0.157 O/H 120,000.00 18,792.00 0.157 18,792.00
10.2 Bahan
Bata merah 5 x 11 x 22 cm 109.620 109.620 Bh 1,000.00 109,620.00 109,620.00
Semen portland 22.503 22.503 Kg 1,340.00 30,154.00 30,154.00
Pasir pasang 0.063 0.063 M3 242,000.00 15,158.00 15,158.00

11 Plesteran 1 PC : 3 Ps Tebal 15 mm 4.432 M2 227,277.00 - 1.551 227,277.00


11.1 Tenaga Kerja
Pekerja 0.886 0.886 O/H 100,000.00 88,640.00 0.886 88,640.00
Tukang Batu 0.665 0.665 O/H 120,000.00 79,776.00 0.665 79,776.00
11.2 Bahan
Semen Portland 28.719 28.719 Kg 1,340.00 38,483.00 38,483.00
Pasir pasang 0.084 0.084 M3 242,000.00 20,378.00 20,378.00

12 Acian 4.432 M2 161,125.00 - 1.330 161,125.00


12.1 Tenaga Kerja
Pekerja 0.886 0.886 O/H 100,000.00 88,640.00 0.886 88,640.00
Tukang Batu 0.443 0.443 O/H 120,000.00 53,184.00 0.443 53,184.00
12.2 Bahan
Semen Portland 14.404 14.404 Kg 1,340.00 19,301.00 19,301.00

13 Pengecatan Dinding 5.600 270,256.00


13.1 Tenaga Kerja
Pekerja 0.112 0.112 O/H 100,000.00 11,200.00 11,200.00
Tukang Cat 0.353 0.353 O/H 120,000.00 42,336.00 42,336.00
13.2 Bahan
Plamur 0.560 0.560 Kg 9,000.00 5,040.00 5,040.00
Cat dasar 0.560 0.560 Kg 105,000.00 58,800.00 58,800.00
Cat penutup 2 kali 1.456 1.456 Kg 105,000.00 152,880.00 152,880.00

13 Pengecatan Reiling 3.398 M2 58,417.00 - 0.068 66,063.00


13.1 Tenaga Kerja
Pekerja 0.068 0.068 O/H 100,000.00 6,796.00 0.068 6,796.00
Tukang Cat - - O/H 120,000.00 - - -
13.2 Bahan
Meni Besi 0.578 0.578 Kg 47,000.00 27,153.00 27,153.00
Cat Besi 0.680 0.680 Kg 36,000.00 24,468.00 24,468.00
Thinner 0.510 0.510 Ltr 15,000.00 7,646.00 7,646.00
19 Pemasangan Pipa PVC AW Ø 1/2" 8.000 M' 228,400.00 - 0.768 232,400.00
19.1 Tenaga Kerja
Pekerja 0.288 0.288 O/H 100,000.00 28,800.00 0.288 28,800.00
Tukang Batu 0.480 0.480 O/H 120,000.00 57,600.00 0.480 57,600.00
19.2 Bahan
Pipa PVC Ø 1/2" 8.000 8.000 M' 17,500.00 140,000.00 140,000.00
Sok Drak Luar 1/2" 1.000 1.000 Bh 2,000.00 2,000.00 2,000.00
Knee 1/2" 2.000 2.000 Bh 2,000.00 4,000.00 4,000.00
20 Pemasangan Kran Air Ø 1/2" 1.000 Bh 38,125.00 - 0.110 38,125.00
20.1 Tenaga Kerja
Pekerja 0.010 0.010 O/H 100,000.00 1,000.00 0.010 1,000.00
Tukang Batu 0.100 0.100 O/H 120,000.00 12,000.00 0.100 12,000.00
20.2 Bahan
Stop Kran Air Ø 1/2" 1.000 1.000 Bh 25,000.00 25,000.00 25,000.00
Seal Type 0.025 0.025 Bh 5,000.00 125.00 125.00

21 Pemasangan Washtafel 1.000 Bh 1,119,460.00 - 2.650 1,119,460.00


21.1 Tenaga Kerja
Pekerja 1.200 1.200 O/H 100,000.00 120,000.00 1.200 120,000.00
Tukang Batu 1.450 1.450 O/H 120,000.00 174,000.00 1.450 174,000.00
21.2 Bahan
Wastafel 1.000 1.000 Bh 815,000.00 815,000.00 815,000.00
Semen Portland 6.000 6.000 Kg 1,340.00 8,040.00 8,040.00
Pasir pasang 0.010 0.010 M3 242,000.00 2,420.00 2,420.00

23 Pek. Pemasangan Pipa PVC AW Ø 1" (Air Kotor) 1.000 M' 50,800.00 - 0.096 50,800.00
23.1 Tenaga Kerja
Pekerja 0.036 0.036 O/H 100,000.00 3,600.00 0.036 3,600.00
Tukang Pipa 0.060 0.060 O/H 120,000.00 7,200.00 0.060 7,200.00
23.2 Bahan + Acc
Pipa PVC Ø 1" 1.000 1.000 M' 40,000.00 40,000.00 40,000.00

B Pekerjaan Reiling Besi 6.530 1,354,854.00


23.1 Tenaga Kerja
Tukang Las 7.836 7.836 O/H 120,000.00 940,320.00 940,320.00
Pekerja - - O/H 100,000.00 - -
23.2 Bahan + Acc
Besi hollow 4 x 4 mm 21.240 21.240 M1 18,167 385,860.00 385,860.00
Pengelasan 21.240 21.240 M1 1,350.00 28,674.00 28,674.00
C Lubang Peresapan
30 Galian Tanah Biasa 0.150 M3 7,200.00 - 0.060 7,200.00
30.1 Tenaga Kerja
Pekerja 0.060 0.060 O/H 120,000.00 7,200.00 0.060 7,200.00

B Pekerjaan Menara Air 4.410 1,515,040.00


23.1 Tenaga Kerja
Tukang Las 5.292 5.292 O/H 120,000.00 635,040.00 635,040.00
Pekerja - - O/H 100,000.00 - -
23.2 Bahan + Acc
Besi Siku 19.000 19.000 M1 20,000.00 380,000.00 380,000.00
Tangki Air 250 Liter 1.000 1.000 Bh 500,000.00 500,000.00 500,000.00

31 Batu Kerikil Sungai 0.098 0.098 M3 613,000.00 59,767.50 59,767.50


Jumlah 7,408,796.58
Dibulatkan 7,408,000.00

Palippu, Juni 2020


Disetujui Oleh : Didampingi oleh : Dibuat Oleh :

Ketua DPMU Kabupaten Wajo KKM "PUNCAK" Fasilitator Masyarakat Pelaksana Pamsimas

( MUH. TAUFIQ, ST ) ( ABDUL HAMID ) (GULBUDIN HEMATIAR, ST ) ( MUH. YAHYA)


NIP : 19750717 2009 02 1003 Koordinator FM-WSS Ketua SATLAK
No Nama Baran/Alat/jasa Satuan NAMA TOKO NAMA TOKO

A Bahan Material kayu UD. USAHA UD.Savar Marwah


SAMPANGE
1 Kayu Balok 5/7 Kls.II M³ Rp 3,500,000 Rp 2,800,000
2 Balok 5/7 KLs II Btg Rp 4,200 Rp 39,500
3 Balok 5/7 KLs III M³ Rp 2,200,000 Rp 2,000,000
4 Balok 5/7 KLs III Btg Rp 31,500 Rp 28,500
5 Kayu Papan 3/20 KLs II M³ Rp 3,500,000 Rp 2,800,000
6 Papan 3/20 KLs II Btg Rp 84,000 Rp 45,000
7 Kayu Papan 3/20 KLs III M³ Rp 3,000,000 Rp 2,800,000
8 Papan 3/20 KLs II Btg Rp 72,000 Rp 32,500
Paya Untuk Peranca/Mal
9 (Kapok,Kemiri,Piawing) M³ Rp 2,250,000 1800000
10 bambu Btg Rp 15,000 Rp 15,000
B BAHAN /MATERIAL YTH BANGUNAN leveransir bangunan
(HERWIN)
1 Tripleks 3mm lbr Rp 50,000
2 Tripleks 4mm lbr Rp 62,000
3 tripleks 6mm lbr Rp 72,000
4 Tripleks 9mm lbr Rp 95,000
5 Semen Portland @50kg Zak Rp 65,000
6 Besi Beton Ø 16 mm Btg Rp 145,000
7 besi Beton Ø 14 mm Btg Rp 135,000
8 besi Beton Ø 12 mm Btg Rp 85,000 Rp 90,000.00
9 besi Beton Ø 10 mm Btg Rp 60,000 Rp 62,000.00
10 besi Beton Ø 8 mm Btg Rp 40,000 Rp 45,000.00
11 besi Beton Ø 6 mm Btg Rp 25,000 Rp 27,500.00
12 Kawat beton kg Rp 20,000 Rp 20,000.00
13 Paku Biasa 3/5/7 kg Rp 20,000 Rp 20,000.00
14 Seng Gelombang Besar lbr Rp 7,500
15 seng Gelombang kecil lbr Rp 7,500
16 Cat meni kg Rp 25,000
17 cat kayu kg Rp 50,000
18 Cat tembok (anti lumut) kg Rp 40,000
19 Cat Anti Bocor kg Rp 40,000
20 Cat besi kg Rp 40,000
21 Seal Tape bh Rp 3,000
22 Lem pipa @400 gram klg Rp 45,000
23 Plamur kg Rp 75,000

C leveransir bangunan Depo RJ.Bagunan


Bahan/Material Levalinsir (HERWIN)
Pasir Urug/Timbunan M³ Rp 500,000
Pasir pasang M³ Rp 500,000 Rp 125,000
Pasir beton M³ Rp 650,000 Rp 150,000
Batu kali/Gunung/Belah M³ Rp 600,000 Rp 150,000
Batu pecah 1/2 cm M³ Rp 1,200,000 Rp 325,000
batu pecah 2/3 cm M³ Rp 1,200,000 Rp 325,000
Batu pecah 3/5 cm M³ Rp 1,200,000 Rp 325,000
Batu batah Merah bh Rp 600 Rp 550
Rooster bh Rp 10,000
D Bahan dan jasa Bengkel las Wira Bengkel Rahmat
Pengelasan Karya
Penutup Man Hole Besi
Plat Uk. 80x80 cm Paket Rp 750,000 Rp 200,000
Penutup Box Valve 60x60
cm Paket Rp 500,000 Rp 300,000
Pipa Ventilasi Ø 2" Paket Rp 150,000 Rp 2,000,000

Kusen dan pintu Besi Plat Paket Rp 2,500,000 Rp 1,500,000


NAMA TOKO

YTH BANGUNAN

Rp 2,800,000
Rp 39,000
Rp 2,000,000
Rp 28,000
Rp 2,800,000
Rp 44,000
Rp 2,800,000
Rp 32,000

Rp 2,000,000
1500
RZL. Perusahaan
Rizal
Rp 55,000.00

Rp 110,000.00
Rp 67,000.00
Rp 165,000.00
Rp 140,000.00
Rp 100,000.00
Rp 70,000.00
Rp 50,000.00
Rp 30,000.00
Rp 20,000.00
Rp 20,000.00

RZL. Perusahaan
Rizal

Rp 125,000
550000 Rp 125,000
650000 Rp 162,500
650000 Rp 150,000
1300000 Rp 300,000
1250000 Rp 300,000
Rp 300,000
650

Bengkel Firdaus

Rp 750,000

Rp 500,000

Rp 2,500,000
RENCANA ANGGARAN BIAYA (RAB)

NAMA KEGIATAN : PENYEDIAAN AIR MINUM & SANITASI BERBASIS MASYARAKAT (PAMSIMAS)
PEKERJAAN : PEMBANGUNAN SARANA AIR BERSIH MASYARAKAT
SUB PEKERJAAN : PEMBANGUNAN RUMAH POMPA/PANEL
DESA : PALIPPU
KECAMATAN : TANASITOLO
KABUPATEN : WAJO

Volume Biaya (Rp)


Harga Satuan
No URAIAN Kontribusi Masy. Satuan Kontribusi Masyarakat
Total APBN Rp Total APBN
inCash inKind inCash inKind HOK
1 2 3=4+5+6 4 5 6 7 8 9=3x8 10=4x8 11=5x8 12 13=6x8

3 Kolom Praktis 9.100 M3 4,131,661.30 745,196.00 32,760.00 0.728 712,436.00


3.1 Tenaga Kerja
Pekerja 0.546 0.546 O/H 100,000.00 54,600.00 0.546 54,600.00
Tukang Batu 0.182 0.182 O/H 120,000.00 21,840.00 0.182 21,840.00
Tukang Kayu - - O/H 120,000.00 - - -
Tukang Besi - - O/H 120,000.00 - - -
3.2 Bahan
Kayu terentang 0.018 0.018 M3 1,800,000.00 32,760.00 32,760.00
Paku biasa 2" - 5' 0.091 0.091 Kg 22,000.00 2,002.00 2,002.00
Besi beton polos 27.300 27.300 Kg 15,859.61 432,967.00 432,967.00
Kawat beton 4.095 4.095 Kg 23,000.00 94,185.00 94,185.00
Semen portland composite 36.400 36.400 Kg 1,340.00 48,776.00 48,776.00
Pasir beton 0.055 0.055 M3 306,000.00 16,707.00 16,707.00
Koral beton 0.082 0.082 M3 505,000.00 41,359.00 41,359.00

4 Pasangan Batu Bata, 1/2 Bata 1:3 14.268 M2 72,611.00 2,039,407.00 - 5.993 2,039,407.00
4.1 Tenaga Kerja
Pekerja 4.566 4.566 O/H 100,000.00 456,576.00 4.566 456,576.00
Tukang Batu 1.427 1.427 O/H 120,000.00 171,216.00 1.427 171,216.00
4.2 Bahan
Bata merah 5 x 11 x 22 cm 998.760 998.760 Bh 1,000.00 998,760.00 998,760.00
Semen portland 205.031 205.031 Kg 1,340.00 274,741.00 274,741.00
Pasir pasang 0.571 0.571 M3 242,000.00 138,114.00 138,114.00

5 Ring Balok 8.460 M3 3,002,648.10 809,988.00 49,406.00 1.125 760,582.00


5.1 Tenaga Kerja
Pekerja 0.846 0.846 O/H 100,000.00 84,600.00 0.846 84,600.00
Tukang Batu 0.279 0.279 O/H 120,000.00 33,501.00 0.279 33,501.00
Tukang Kayu - - O/H 120,000.00 - - -
Tukang Besi - - O/H 120,000.00 - - -
5.2 Bahan
Kayu terentang 0.025 0.025 M 3
1,800,000.00 45,684.00 45,684.00
Paku biasa 2" - 5' 0.169 0.169 Kg 22,000.00 3,722.00 3,722.00
Besi beton polos 30.456 30.456 Kg 15,859.61 483,020.00 483,020.00
Kawat beton 0.423 0.423 Kg 23,000.00 9,729.00 9,729.00
Semen portland composite 46.530 46.530 Kg 1,340.00 62,350.00 62,350.00
Pasir beton 0.076 0.076 M3 306,000.00 23,298.00 23,298.00
Koral beton 0.127 0.127 M3 505,000.00 64,084.00 64,084.00

6 Plesteran 1 PC : 3 Ps Tebal 15 mm 30.944 M2 23,782.60 1,475,445.00 - 9.902 1,475,445.00


6.1 Tenaga Kerja
Pekerja 6.189 6.189 O/H 100,000.00 618,880.00 6.189 618,880.00
Tukang Batu 3.713 3.713 O/H 120,000.00 445,593.00 3.713 445,593.00
6.2 Bahan
Semen Portland 200.517 200.517 Kg 1,340.00 268,692.00 268,692.00
Pasir pasang 0.588 0.588 M3 242,000.00 142,280.00 142,280.00

7 Acian 30.944 M2 15,315.00 506,089.00 371,328.00 3.094 134,761.00


7.1 Tenaga Kerja
Pekerja - - O/H 100,000.00 - - -
Tukang Batu 3.094 3.094 O/H 120,000.00 371,328.00 371,328.00 3.094
7.2 Bahan
Semen Portland 100.568 100.568 Kg 1,340.00 134,761.00 134,761.00

8 Pengecatan Dinding 30.944 M2 17,777.40 1,431,468.00 233,936.00 1.949 1,197,532.00


8.1 Tenaga Kerja
Pekerja - - O/H 100,000.00 - - -
Tukang Cat 1.949 1.949 O/H 120,000.00 233,936.00 233,936.00 1.949
8.2 Bahan
Plamur 3.094 3.094 Kg 9,000.00 27,849.00 27,849.00
Cat dasar 3.094 3.094 Kg 105,000.00 324,912.00 324,912.00
Cat penutup 2 kali 8.045 8.045 Kg 105,000.00 844,771.00 844,771.00

9 Pek. Pasang Kaso + reng atap kayu kamper 9.505 M2 54,396.00 660,458.00 95,052.00 1.901 565,406.00
9.1 Tenaga Kerja
Pekerja 0.951 0.951 O/H 100,000.00 95,052.00 95,052.00 0.951
Tukang Kayu 0.951 0.951 O/H 120,000.00 114,062.00 0.951 114,062.00
9.2 Bahan
Kayu kamper, balok 0.114 0.114 M3 3,682,000.00 419,977.00 419,977.00
Paku biasa 2" - 5" 1.426 1.426 Kg 22,000.00 31,367.00 31,367.00

10 Pek. Pasang Atap Seng gelombang 11.424 M2 46,250.00 648,218.00 137,092.00 2.056 511,126.00
10.1 Tenaga Kerja
Pekerja 1.371 1.371 O/H 100,000.00 137,092.00 137,092.00 1.371
Tukang Kayu 0.685 0.685 O/H 120,000.00 82,255.00 0.685 82,255.00
10.2 Bahan
Seng Gelombang BJLS 0,03 (6 Kaki) 7.997 7.997 Lbr 53,000.00 423,845.00 423,845.00
Paku seng 0.228 0.228 Kg 22,000.00 5,026.00 5,026.00

11 Pek. Listplank 2x(2x20 cm) kayu kamper 16.340 M' 41,104.83 898,457.00 163,400.00 3.268 735,057.00
11.1 Tenaga Kerja
Pekerja 1.634 1.634 O/H 100,000.00 163,400.00 163,400.00 1.634
Tukang Kayu 1.634 1.634 O/H 120,000.00 196,080.00 1.634 196,080.00
11.2 Bahan
Kayu Kamper, papan 0.141 0.141 Lbr 3,682,000.00 517,409.00 517,409.00
Paku Biasa 2" - 5" 0.980 0.980 Kg 22,000.00 21,568.00 21,568.00

12 Pasang Kusen Pintu 0.029 M3 5,534,628.00 148,246.00 - 0.706 148,246.00


12.1 Tenaga Kerja
Pekerja 0.176 0.176 O/H 100,000.00 17,640.00 0.176 17,640.00
Tukang Kayu 0.529 0.529 O/H 120,000.00 63,504.00 0.529 63,504.00
12.2 Bahan
Kayu kamper, Balok 0.035 0.035 M3 1,902,000.00 67,102.00 67,102.00

13 Pasang Pintu Panel Kayu Kamper 1.296 M2 330,487.60 709,274.00 - 4.536 709,274.00
13.1 Tenaga Kerja
Pekerja 1.296 1.296 O/H 100,000.00 129,600.00 1.296 129,600.00
Tukang Kayu 3.240 3.240 O/H 120,000.00 388,800.00 3.240 388,800.00
13.2 Bahan
Kayu kamper, Papan 0.052 0.052 M3 3,682,000.00 190,874.00 190,874.00

14 Pasang Kunci Tanam Biasa 1.000 Bh 75,400.00 54,800.00 200.00 0.002 54,600.00
14.1 Tenaga Kerja
Pekerja 0.002 0.002 O/H 100,000.00 200.00 200.00 0.002
Tukang Kayu - - O/H 120,000.00 - - -
14.2 Bahan
Kunci tanam biasa 1.000 1.000 Bh 54,600.00 54,600.00 54,600.00

15 Pasang Engsel Pintu 2.000 Bh 14,600.00 81,000.00 3,000.00 0.030 78,000.00


15.1 Tenaga Kerja
Pekerja 0.030 0.030 O/H 100,000.00 3,000.00 3,000.00 0.030
Tukang Kayu - - O/H 120,000.00 - - -
15.2 Bahan
Engsel pintu 2.000 2.000 Bh 39,000.00 78,000.00 78,000.00

16 Pengecatan Kayu 5.844 M2 25,034.00 255,780.00 47,217.00 0.462 208,563.00


16.1 Tenaga Kerja
Pekerja 0.409 0.409 O/H 100,000.00 40,906.00 40,906.00 0.409
Tukang Cat 0.053 0.052 O/H 120,000.00 6,311.00 6,311.00 0.053
16.2 Bahan
Cat Meni 1.169 1.169 Kg 47,000.00 54,931.00 54,931.00
Plamur Kayu 0.877 0.877 Kg 9,000.00 7,889.00 7,889.00
Cat Kayu 0.993 0.993 Kg 58,000.00 57,619.00 57,619.00
Cat Penutup 2 kali 1.519 1.519 Kg 58,000.00 88,124.00 88,124.00

17 Loster Beton (18x30 cm) 3.000 Bh 40,000.00 120,000.00 120,000.00

18 Baut 17 mm 4.000 Bh 5,000.00 20,000.00 20,000.00

JUMLAH BAHAN 6,673,700.00 - 82,100.00 6,591,600.00


JUMLAH UPAH 3,929,900.00 1,051,200.00 2,878,700.00
JUMLAH 10,603,600.00 1,133,300.00 9,470,300.00
Dibulatkan 10,603,600.00 1,133,300.00 9,470,300.00

Palippu, Juni 2020

Disetujui Oleh : Dibuat Oleh :


Ketua DPMU Kabupaten Wajo KKM "PUNCAK" Fasilitator Masyarakat Pelaksana Pamsimas

( MUH. TAUFIQ, ST ) ( ABDUL HAMID ) ( NGAJI )


NIP : 19750717 2009 02 1003 Koordinator FM - WSS Ketua SATLAK
RENCANA ANGGARAN BIAYA (RAB)

NAMA KEGIATAN : PENYEDIAAN AIR MINUM & SANITASI BERBASIS MASYARAKAT (PAMSIMAS)
PEKERJAAN : PEMBANGUNAN SARANA AIR BERSIH MASYARAKAT
SUB PEKERJAAN : PEMBANGUNAN SUMUR GALI (SGL)
DESA : PALIPPU
KECAMATAN : TANASITOLO
KABUPATEN : WAJO

Volume Biaya (Rp)


Harga Satuan
No URAIAN Kontribusi Masy. Satuan Kontribusi Masyarakat
Total APBN Rp Total APBN
inCash inKind inCash inKind HOK
1 2 3=4+5+6 4 5 6 7 8 9=3x8 10=4x8 11=5x8 12 13=6x8

1 Pekerjaan Persiapan 200,000.00 200,000.00 - -


1.1 Pembersihan Lahan 1.000 1.000 Ls 200,000.00 200,000.00 200,000.00

2 Pemasangan Bouplank 20.400 M' 58,031.61 1,606,459.00 1,606,459.00 4.080 -


2.1 Tenaga Kerja
Pekerja 2.040 2.040 O/H 100,000.00 204,000.00 204,000.00 2.040
Tukang Kayu 2.040 2.040 O/H 120,000.00 244,800.00 244,800.00 2.040
2.2 Bahan
Balok kayu Klas III 0.245 0.245 M3 2,800,000.00 685,440.00 685,440.00
Papan kayu Klas III 0.143 0.143 M3 3,244,000.00 463,243.00 463,243.00
Paku biasa 2" - 5" 0.408 0.408 Kg 22,000.00 8,976.00 8,976.00

3 Galian Tanah Biasa 103.040 M3 16,000.00 10,819,200.00 5,409,600.00 108.192 5,409,600.00


3.1 Tenaga Kerja
Pekerja 108.192 54.096 54.096 O/H 100,000.00 10,819,200.00 5,409,600.00 108.192 5,409,600.00
Tukang Gali - O/H -

4 Urugan Tanah Kembali Dipadatkan 25.760 M3 20,000.00 1,288,000.00 1,288,000.00 12.880 -


4.1 Tenaga Kerja
Pekerja 12.880 12.880 O/H 100,000.00 1,288,000.00 1,288,000.00 12.880
Tukang Gali - O/H -

5 Urugan Pasir 0.760 M' 87,516.00 243,504.00 22,800.00 0.228 220,704.00


5.1 Tenaga Kerja
Pekerja 0.228 0.228 O/H 100,000.00 22,800.00 22,800.00 0.228
5.2 Bahan
Pasir Urug 0.912 0.912 0.912 M3 242,000.00 220,704.00 220,704.00

6 Pasangan Batu Kosong 2.280 M3 251,979.00 1,530,792.00 284,544.00 2.668 1,246,248.00


6.1 Tenaga Kerja
Pekerja 1.778 1.778 O/H 100,000.00 177,840.00 177,840.00 1.778
Tukang Batu 0.889 0.889 O/H 120,000.00 106,704.00 106,704.00 0.889
6.2 Bahan
Batu Kali 2.736 2.736 M3 395,000.00 1,080,720.00 1,080,720.00
Pasir Urug 0.684 0.684 M3 242,000.00 165,528.00 165,528.00

7 Pas. Pondasi Batu Kali 1 PC : 3 Pasir 41.800 M3 516,027.40 43,662,190.00 - 87.780 43,662,190.00
7.1 Tenaga Kerja
Pekerja 62.700 62.700 O/H 100,000.00 6,270,000.00 62.700 6,270,000.00
Tukang Batu 25.080 25.080 O/H 120,000.00 3,009,600.00 25.080 3,009,600.00
7.2 Bahan
Batu Kali 45.980 45.980 M3 395,000.00 18,162,100.00 18,162,100.00
Semen Portland 8,443.600 8,443.600 Kg 1,340.00 11,314,424.00 11,314,424.00
Pasir Pasang 20.273 20.273 M3 242,000.00 4,906,066.00 4,906,066.00

8 Plesteran 1 PC : 3 Ps Tebal 15 mm 91.200 M2 23,782.60 4,348,524.00 1,824,000.00 29.184 2,524,524.00


8.1 Tenaga Kerja
Pekerja 18.240 18.240 O/H 100,000.00 1,824,000.00 1,824,000.00 18.240
Tukang Batu 10.944 10.944 O/H 120,000.00 1,313,280.00 10.944 1,313,280.00
8.2 Bahan
Semen Portland 590.976 590.976 Kg 1,340.00 791,907.00 791,907.00
Pasir Pasang 1.733 1.733 M3 242,000.00 419,337.00 419,337.00

9 Acian 91.200 M2 15,315.00 1,491,576.00 1,094,400.00 9.120 397,176.00


9.1 Tenaga Kerja
Pekerja - - O/H 100,000.00 - - -
Tukang Batu 9.120 9.120 O/H 120,000.00 1,094,400.00 1,094,400.00 9.120
9.2 Bahan
Semen Portland 296.400 296.400 Kg 1,340.00 397,176.00 397,176.00

10 Sloof Beton Bertulang (Diatas Pondasi) 0.456 M3 3,002,648.10 2,086,207.00 442,776.00 2.371 1,643,431.00
10.1 Tenaga Kerja
Pekerja 2.212 2.212 O/H 100,000.00 221,160.00 221,160.00 2.212
Tukang Batu 0.160 0.160 O/H 120,000.00 19,152.00 0.160 19,152.00
Tukang Kayu - - O/H 120,000.00 - - -
Tukang Besi - - O/H 120,000.00 - - -
10.2 Bahan
Kayu terentang 0.123 0.123 M 3
1,800,000.00 221,616.00 221,616.00
Paku biasa 2" - 5' 0.912 0.912 Kg 22,000.00 20,064.00 20,064.00
Minyak bekisting 0.274 0.274 Ltr - - -
Besi beton polos 68.400 68.400 Kg 15,859.61 1,084,797.00 1,084,797.00
Kawat beton 1.368 1.368 Kg 23,000.00 31,464.00 31,464.00
Semen portland composite 147.288 147.288 Kg 1,340.00 197,365.00 197,365.00
Pasir beton 0.237 0.237 M3 306,000.00 72,558.00 72,558.00
Koral beton 0.356 0.356 M3 613,000.00 218,031.00 218,031.00

11 Sloof Beton Bertulang (Dibawah Plat Penutup) 0.228 M3 3,002,648.10 1,023,896.00 221,388.00 1.186 802,508.00
11.1 Tenaga Kerja
Pekerja 1.106 1.106 O/H 100,000.00 110,580.00 110,580.00 1.106
Tukang Batu 0.080 0.080 O/H 120,000.00 9,576.00 0.080 9,576.00
Tukang Kayu - - O/H 120,000.00 - - -
Tukang Besi - - O/H 120,000.00 - - -
11.2 Bahan
Kayu terentang 0.062 0.062 M3 1,800,000.00 110,808.00 110,808.00
Paku biasa 2" - 5' 0.456 0.456 Kg 22,000.00 10,032.00 10,032.00
Minyak bekisting 0.137 0.137 Ltr - - -
Besi beton polos 34.200 34.200 Kg 15,859.61 542,398.00 542,398.00
Kawat beton 0.684 0.684 Kg 23,000.00 15,732.00 15,732.00
Semen portland composite 73.644 73.644 Kg 1,340.00 98,682.00 98,682.00
Pasir beton 0.119 0.119 M3 306,000.00 36,279.00 36,279.00
Koral beton 0.178 0.178 M3 505,000.00 89,809.00 89,809.00

12 Membuat Plat Beton Bertulang (Tebal 15 cm) 2.129 M3 3,532,820.40 10,323,117.00 2,460,546.00 13.090 7,862,571.00
12.1 Tenaga Kerja
Pekerja 12.345 12.345 O/H 100,000.00 1,234,530.00 1,234,530.00 12.345
Tukang Batu 0.745 0.745 O/H 120,000.00 89,397.00 0.745 89,397.00
Tukang Kayu - - O/H 120,000.00 - - -
Tukang Besi - - O/H 120,000.00 - - -
12.2 Bahan
Kayu terentang 0.681 0.681 M3 1,800,000.00 1,226,016.00 1,226,016.00
Paku biasa 2" - 5' 6.811 6.811 Kg 22,000.00 149,846.00 149,846.00
Minyak bekisting 3.406 3.406 Ltr - - -
Besi beton polos 212.850 212.850 Kg 15,859.61 3,375,717.00 3,375,717.00
Kawat beton 4.789 4.789 Kg 23,000.00 110,149.00 110,149.00
Semen portland composite 687.506 687.506 Kg 1,340.00 921,257.00 921,257.00
Pasir beton 1.107 1.107 M3 306,000.00 338,686.00 338,686.00
Koral beton 1.660 1.660 M3 505,000.00 838,416.00 838,416.00
Kayu Borneo balok 0.255 0.255 M3 1,800,000.00 459,756.00 459,756.00
Plywood 9 mm 5.960 5.960 Lmbr 110,000.00 655,578.00 655,578.00
Dolken Ø 8 cm/4 m 29.799 29.799 Btg 31,000.00 923,769.00 923,769.00

13 Pek. Urugan Sirtu 2.400 M' 130,500.00 984,960.00 288,000.00 2.880 696,960.00
13.1 Tenaga Kerja
Pekerja 2.880 2.880 O/H 100,000.00 288,000.00 288,000.00 2.880
13.2 Bahan
Sirtu 2.880 2.880 2.880 M3 242,000.00 696,960.00 696,960.00

14 Pengecatan Dinding 15.200 M2 17,777.40 703,152.00 114,912.00 0.958 588,240.00


14.1 Tenaga Kerja
Pekerja - - O/H 100,000.00 - - -
Tukang Cat 0.958 0.958 O/H 120,000.00 114,912.00 114,912.00 0.958
14.2 Bahan
Plamur 1.520 1.520 Kg 9,000.00 13,680.00 13,680.00
Cat dasar 1.520 1.520 Kg 105,000.00 159,600.00 159,600.00
Cat penutup 2 kali 3.952 3.952 Kg 105,000.00 414,960.00 414,960.00

15 Man Hole (80x80 cm) + Gembok 1.000 Ls 750,000.00 750,000.00 750,000.00

16 Ventilasi Udara GIP 2" 1.000 Ls 100,000.00 100,000.00 100,000.00

JUMLAH BAHAN - 2,716,000.00 49,783,500.00


JUMLAH UPAH 12,541,300.00 16,120,600.00
JUMLAH 81,161,400.00 15,257,300.00 65,904,100.00
Dibulatkan 81,161,400.00 15,257,300.00 65,904,100.00

Palippu, Juni 2020

Disetujui Oleh : Dibuat Oleh :


Ketua DPMU Kabupaten Wajo KKM "PUNCAK" Fasilitator Masyarakat Pelaksana Pamsimas

( MUH. TAUFIQ, ST ) ( ABDUL HAMID ) ( MUH. YAHYA)


NIP : 19750717 2009 02 1003 Koordinator FM - WSS Ketua SATLAK
RENCANA ANGGARAN BIAYA
Provinsi/Kabupaten-Kota/Kecamatan/Desa : Sulawesi Selatan/Wajo/Pitumpanua/ALELEBAE
Nomor RAB : Sub pekerjaan/Kegiatan : Reservoir
Pekerjaan Kegiatan : Sarana Air Minum Ukuran/Dimensi : 2,8 x 2,8 x 2,1 m
Kapasitas : 16 m³
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN APBDES Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5+6 3 4 5 6 7 8 9=2x8 10=3x8 11=4x8 12=5x8
0 PENGADAAN APD
Pengadaa APD masker untuk tukang dan pekerja 0.00 10,000 0 0
Pengadaa APD Kaos tangan untuk tukang dan pekerja 0.00 10,000 0 0
Termometer gun 0.00 1,000,000 0 0
Desinpektan 0.00 120,000 0 0
1 BAHAN
A. PEKERJAAN PENDAHULUAN
1.1 Pemasangan Bowplank 12.80
- Kayu klas III uk. 5/7 0.180 0.180 - M³ 2,200,000 396,000 - 396,000
- Paku biasa 2" - 5" 0.256 0.256 - Kg 20,000 5,120 - 5,120
- Kayu papan kls. III 3/20 0.090 0.090 - M³ 2,500,000 224,000 - 224,000
B. PEKERJAAN TANAH -
2.1 Urugan Pasir 1.101 -
- Pasir urug 1.469 1.469 - M³ 100,000 146,880 - - 146,880
C. PEKERJAAN BETON -
3.1 Lantai Kerja t. 5 cm 0.612 -
- Semen Portland 140.760 140.760 - M³ 1,300 182,988 - - 182,988
- Pasir beton 0.390 0.390 - M³ 110,000 42,941 - - 42,941
- Batu pecah 2/3 cm 0.466 0.466 - M³ 350,000 162,951 - - 162,951
3.2 Pondasi Poor Plat 1,5 x 1,5 -
* Beton 3.150 -
- Semen portland 1,108.800 1,108.800 - Kg 1,300 1,441,440 - - 1,441,440
- Pasir Beton 1.645 1.645 - M³ 110,000 180,923 - - 180,923
- Batu pecah 2/3 cm 2.406 2.406 - M³ 350,000 841,983 - - 841,983
* Pembesian 263.176 -
- Besi beton Polos Ø 14 276.335 276.335 - Kg 9,986 2,759,546 - - 2,759,546
- Kawat beton 3.948 3.948 - Kg 20,000 78,953 - - 78,953
* Bekisting 4.800 -
- Kayu kls. III 0.192 0.192 - M³ 2,500,000 480,000 - 480,000
- Paku biasa 2" - 5" 1.440 1.440 - Kg 20,000 28,800 - - 28,800
3.3 Kolom30x30 -
* Beton 3.240 -
- Semen portland 1,140.480 1,140.480 - Kg 1,300 1,482,624 - - 1,482,624
- Pasir Beton 1.692 1.692 - M³ 110,000 186,092 - - 186,092
- Batu pecah 2/3 cm 2.474 2.474 - M³ 350,000 866,040 - 866,040
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN APBDES Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5+6 3 4 5 6 7 8 9=2x8 10=3x8 11=4x8 12=5x8
* Pembesian 473.433 -
- Besi beton Polos Ø 14 387.732 387.732 - Kg 9,986 3,871,981 - - 3,871,981
- Besi beton Polos Ø 8 109.372 109.372 - Kg 9,494 1,038,342 - - 1,038,342
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN APBDES Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5+6 3 4 5 6 7 8 9=2x8 10=3x8 11=4x8 12=5x8
- Kawat beton 7.101 7.101 - Kg - - - -
* Bekisting 14.400 -
- Kayu Kls. III - - - - M³ - - - -
- Paku biasa 2" - 5" 5.760 5.760 - Kg 20,000 115,200 - - 115,200
- Balok Kayu Kls. II 0.216 0.216 - M³ 2,200,000 475,200 - 475,200
- Tripleks 9 mm 5.040 5.040 - Lbr 110,000 554,400 - - 554,400
- Bambu 21.600 21.600 - Btg 35,000 756,000 - 756,000
3.4 Kolom 20x20 K2
* Beton 0.368
- Semen portland 129.536 129.536 - Kg 1,300 168,397 - 168,397
- Pasir Beton 0.192 0.192 - M³ 110,000 21,136 - 21,136
- Batu pecah 2/3 cm 0.281 0.281 - M³ 350,000 98,365 98,365
* Pembesian 51.030 -
- Besi beton Polos Ø 12 35.794 35.794 - Kg 15,860 567,687 - 567,687
- Besi beton Polos Ø 8 17.787 17.787 - Kg 9,494 168,862 - 168,862
- Kawat beton 0.765 0.765 Kg 20,000 15,309 - 15,309
* Bekisting 2.453 -
- Kayu Kls. III - - - - M³ - - -
- Paku biasa 2" - 5" 0.981 0.981 - Kg 20,000 19,627 - 19,627
- Balok Kayu Kls. III 0.037 0.037 - M³ 2,200,000 80,960 - 80,960
- Tripleks 9 mm 0.859 0.859 - Lbr 110,000 94,453 - 94,453
- Bambu 4.907 4.907 - Btg 35,000 171,733 - 171,733
3.5 Balok 20 x 30 (B2) -
* Beton 1.776 -
- Semen portland 625.152 625.152 - Kg 1,300 812,698 - - 812,698
- Pasir Beton 0.927 0.927 - M³ 110,000 102,006 - - 102,006
- Batu pecah 2/3 cm 1.356 1.356 - M³ 350,000 474,718 - - 474,718
* Pembesian 311.711 -
- Besi beton Polos Ø 12 265.551 265.551 - Kg 15,860 4,211,533 - - 4,211,533
- Besi beton Polos Ø 8 61.745 61.745 - Kg 9,494 586,191 - - 586,191
- Kawat beton 4.676 4.676 - Kg 20,000 93,513 - - 93,513
* Bekisting 7.893 -
- Kayu Kls. III - - - - M³ - - - -
- Paku biasa 2" - 5" 3.157 - 3.157 - Kg 20,000 63,147 - - 63,147
- Balok Kayu Kls. II 0.142 0.142 - M³ 2,200,000 312,576 - 312,576
- Tripleks 9 mm 2.763 - 2.763 - Lbr 110,000 303,893 - - 303,893
- Bambu 15.787 15.787 - Btg 35,000 552,533 - 552,533
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN APBDES Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5+6 3 4 5 6 7 8 9=2x8 10=3x8 11=4x8 12=5x8
3.6 Balok 20 x 35 ( B1 ) -
* Beton 0.840 -
- Semen portland 295.680 295.680 - Kg 1,300 384,384 - - 384,384
- Pasir Beton 0.439 0.439 - M³ 110,000 48,246 - - 48,246
- Batu pecah 2/3 cm 0.642 0.642 - M³ 350,000 224,529 - - 224,529
* Pembesian 134.334 -
- Besi beton Polos Ø 12 107.908 107.908 - Kg 15,860 1,711,375 - - 1,711,375
- Besi beton Polos Ø 8 33.143 33.143 - Kg 9,494 314,649 - - 314,649
- Kawat beton 2.015 2.015 - Kg 20,000 40,300 - - 40,300
* Bekisting 3.600 -
- Kayu Kls. III - - - - M³ - - - -
- Paku biasa 2" - 5" 1.440 1.440 - Kg 20,000 28,800 - - 28,800
- Balok Kayu Kls. II 0.065 0.065 - M³ 2,200,000 142,560 - 142,560
- Tripleks 9 mm 1.260 1.260 - Lbr 110,000 138,600 - - 138,600
- Bambu 7.200 7.200 - Btg 35,000 252,000 - 252,000
3.7 Sloef 20 x 30 ( S1 ) -
* Beton 0.720
- Semen portland 253.440 253.440 - Kg 1,300 329,472 - - 329,472
- Pasir Beton 0.376 0.376 - M³ 110,000 41,354 - - 41,354
- Batu pecah 2/3 cm 0.550 0.550 - M³ 350,000 192,453 - - 192,453
* Pembesian 145.859 -
- Besi beton Polos Ø 12 123.323 123.323 - Kg 15,860 1,955,857 - - 1,955,857
- Besi beton Polos Ø 8 29.829 29.829 - Kg 9,494 283,184 - - 283,184
- Kawat beton 2.188 2.188 Kg 20,000 43,758 - - 43,758
* Bekisting 2.400 -
- Kayu Kls. III - - - - M³ - - - -
- Paku biasa 2" - 5" 0.960 0.960 - Kg 20,000 19,200 - - 19,200
- Balok Kayu Kls. II 0.043 0.043 - M³ 2,200,000 95,040 - 95,040
- Tripleks 9 mm 0.840 0.840 - Lbr 110,000 92,400 - - 92,400
- Bambu 4.800 4.800 - Btg 35,000 168,000 - 168,000
3.8 Ringbalk 20 x 25 ( RB2 ) -
* Beton 0.600 -
- Semen portland 211.200 211.200 - Kg 1,300 274,560 - - 274,560
- Pasir Beton 0.313 0.313 - M³ 110,000 34,461 - - 34,461
- Batu pecah 2/3 cm 0.458 0.458 - M³ 350,000 160,378 - - 160,378
* Pembesian 68.397 -
- Besi beton Polos Ø 12 45.302 45.302 - Kg 15,860 718,478 - - 718,478
- Besi beton Polos Ø 8 26.514 26.514 - Kg 9,494 251,719 - - 251,719
- Kawat beton 1.026 1.026 - Kg 20,000 20,519 - - 20,519
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN APBDES Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5+6 3 4 5 6 7 8 9=2x8 10=3x8 11=4x8 12=5x8
* Bekisting 2.000 -
- Kayu Kls. III - - - - M³ - - - -
- Paku biasa 2" - 5" 0.800 0.800 - Kg 20,000 16,000 - - 16,000
- Balok Kayu Kls. II 0.036 0.036 - M³ 2,200,000 79,200 - 79,200
- Tripleks 9 mm 0.700 0.700 - Lbr - - - -
- Bambu 4.000 1.000 3.000 - Btg 35,000 140,000 - 35,000 105,000
3.9 Plat Lantai t. 15 cm -
* Beton 1.536 -
- Semen portland 540.672 540.672 - Kg 1,300 702,874 - - 702,874
- Pasir Beton 0.802 0.802 - M³ 110,000 88,221 - - 88,221
- Batu pecah 2/3 cm 1.173 1.173 - M³ 350,000 410,567 - - 410,567
* Pembesian 149.996 -
- Besi beton Polos Ø 12 157.496 157.496 - Kg 15,860 2,497,821 - - 2,497,821
- Kawat beton 2.250 2.250 - Kg 20,000 44,999 - - 44,999
* Bekisting 4.267 -
- Kayu Kls. III - - M³ - - - -
- Paku biasa 2" - 5" 1.707 1.707 - Kg 20,000 34,133 - - 34,133
- Balok Kayu Kls. II 0.064 0.064 - M³ 2,200,000 140,800 - 140,800
- Tripleks 9 mm 1.493 1.493 - Lbr 110,000 164,267 - - 164,267
- Bambu 25.600 19.600 6.0 - Btg 35,000 896,000 - 686,000 210000
3.10 Dinding Beton t. 15 cm -
* Beton 4.416 -
- Semen portland 1,554.432 1,554.432 - Kg 1,300 2,020,762 - - 2,020,762
- Pasir Beton 2.306 2.306 - M³ 110,000 253,636 - - 253,636
- Batu pecah 2/3 cm 3.373 3.373 - M³ 350,000 1,180,380 - - 1,180,380
* Pembesian 4.416 -
- Besi beton Polos Ø 12 452.800 452.800 - Kg 15,860 7,181,235 - - 7,181,235
- Kawat beton 6.469 6.469 - Kg 20,000 129,371 - - 129,371
* Bekisting 19.627 -
- Kayu Kls. III - - - - M³ - - - -
- Paku biasa 2" - 5" 7.851 7.851 - Kg 20,000 157,013 - - 157,013
- Balok Kayu Kls. II 0.393 0.393 - M³ 2,200,000 863,573 - 863,573 -
- Tripleks 9 mm 6.869 6.869 - Lbr 110,000 755,627 - - 755,627
- Bambu 58.880 58.880 - Btg 35,000 2,060,800 - 2,060,800
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN APBDES Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5+6 3 4 5 6 7 8 9=2x8 10=3x8 11=4x8 12=5x8
3.11 Plat Atap t. 12 cm -
* Beton 1.685 -
- Semen portland 593.155 593.155 - Kg 1,300 771,102 - - 771,102
- Pasir Beton 0.880 0.880 - M³ 110,000 96,785 - - 96,785
- Batu pecah 2/3 cm 1.287 1.287 - M³ 350,000 450,421 - - 450,421
* Pembesian 232.920 -
- Besi beton Polos Ø 10 244.566 244.566 - Kg 10,130 2,477,370 - - 2,477,370
- Kawat beton 3.494 3.494 - Kg 20,000 69,876 - - 69,876
* Bekisting 4.129 -
- Kayu Kls. III - - - - M³ - - - -
- Paku biasa 2" - 5" 1.651 1.651 - Kg 20,000 33,029 - - 33,029
- Balok Kayu Kls. II 0.062 0.062 - M³ 2,200,000 136,245 - 136,245
- Tripleks 9 mm 1.445 1.445 - Lbr 110,000 158,952 - - 158,952
- Bambu 24.772 24.772 - Btg 35,000 867,011 - 867,011
D. PEKERJAAN FINISHING -
4.1 Plesteran 151.960 -
- Semen Portland 1,264.307 1,264.307 - Kg 1,300 1,643,599 - - 1,643,599
- Pasir pasang 4.863 4.863 - M³ 100,000 486,272 - - 486,272
4.2 Acian 151.960 -
- Semen Portland 493.870 493.870 - Kg 1,300 642,031 - - 642,031
4.3 Pekerjaan Man Hole 80 x 80 -
- Penutup Man Hole Besi Plat 80 x 80 1.000 1.000 - Ls 600,000 600,000 - - 600,000
4.4 Pipa Vent Gip Ø 1 1/2" -
- Pipa Vent Gip Ø 1 1/2" - - Ls 327,000 - - - -
4.5 Pengecatan 151.960 -
- Plamir tembok 15.196 15.196 - Kg 5,000 75,980 - - 75,980
- Cat dasar 15.196 15.196 - Kg 65,000 987,740 - - 987,740
- Cat tembok 39.510 39.510 - Kg 65,000 2,568,124 - - 2,568,124
4.6 Tangga Monyet -
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN APBDES Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5+6 3 4 5 6 7 8 9=2x8 10=3x8 11=4x8 12=5x8
Tangga Monyet Pipa GIP Ø ¾" 1.000 1.000 - Ls 2,000,000 2,000,000 - - 2,000,000
D. PEKERJAAN PIPA -
- Pipa inlet GIP Ø 1" Medium A - - - Btg - - - -
- Pipa inlet GIP Ø 1 1/2" Medium A 2.000 2.000 - Btg 527,000 1,054,000 - - 1,054,000
- Pipa outlet GIP Ø 2" Medium A 2.000 2.000 - Btg 720,000 1,440,000 - - 1,440,000
- Pipa penguras GIP Ø 2" Medium A 1.000 1.000 - Btg 720,000 720,000 - - 720,000
- Pipa peluap GIP Ø 1 1/2" Medium A - - Btg 527,000 - - - -
- Gate valve PVC Ø 3" - - Bh 300,000 - - - -
- Gate valve GIP Ø 1 1/2" 1.000 1.000 - Bh 300,000 300,000 - - 300,000
- Gate valve GIP Ø 2" 1.000 1.000 - Bh 493,000 493,000 - - 493,000
- Knee 90° GIP Ø 3" - - Bh 156,000 - - - -
- Knee 90° GIP Ø 1 1/2" 3.000 3.000 - Bh 40,000 120,000 - - 120,000
- Knee 90° GIP Ø 2" 1.000 4.000 - Bh 56,000 56,000 - - 224,000
- Knee 90° PVC Ø 3" - - Bh 104,000 - - - -
- Socket GIP Ø 3" - - Bh 104,000 - - - -
- Socket GIP Ø 2" 1.000 1.000 - Bh 43,000 43,000 - - 43,000
- Socket GIP Ø 1 1/2" 1.000 1.000 - Bh 37,000 37,000 - - 37,000
- Sock Drat Luar PVC SNI Ø 3" - - Bh 103,000 - - - -
- Sock Drat luar PVC SNI Ø 2" 1.000 1.000 - Bh 38,000 38,000 - - 38,000
- Sock Drat luar PVC SNI Ø 1 1/2" 1.000 1.000 - Bh 15,000 15,000 - - 15,000
- Tee PVC Ø 2" 1.000 1.000 Bh 50,000 50,000 - - 50,000
- Lem Pipa 2.000 2.000 - Klg 50,000 100,000 - - 100,000
- Seal Tape 10.000 10.000 - Bh 5,000 50,000 - - 50,000
- Cat Meni Besi 3.000 3.000 - Kg 45,000 135,000 - - 135,000
- Cat Besi 6.000 6.000 - Kg 57,000 342,000 - - 342,000
Sub Total 1) 72,078,834 - 7,558,941 64,687,893
Dibulatkan 72,246,000 - 7,559,000 64,687,000
2 UPAH
A. PEKERJAAN PENDAHULUAN

- Pekerja 2.100 2.100 - Hok 100,000 210,000 - 210,000


1.2 Pemasangan Bowplank 12.800
- Pekerja 1.280 1.280 - Hok 100,000 128,000 - 128,000
- Tukang 1.280 1.280 - Hok 120,000 153,600 - 153,600
B. PEKERJAAN TANAH
2.1 Galian Tanah 22.950
- Pekerja 17.213 17.213 - Hok 100,000 1,721,250 - 1,721,250
2.2 Urugan Pasir 1.224
- Pekerja 0.367 0.367 - Hok 100,000 36,720 - 36,720
2.3 Urugan Kembali 22.950
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN APBDES Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5+6 3 4 5 6 7 8 9=2x8 10=3x8 11=4x8 12=5x8
- Pekerja 5.738 5.738 - Hok 100,000 573,750 - 573,750
C. PEKERJAAN BETON
3.1 Lantai Kerja 0.612
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN APBDES Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5+6 3 4 5 6 7 8 9=2x8 10=3x8 11=4x8 12=5x8
- Pekerja 1.010 1.010 - Hok 100,000 100,980 - 100,980
- Tukang 0.168 0.168 - Hok 120,000 20,196 - 20,196
3.2 Pondasi Poor Plat 1,5 x 1,5
* Beton 3.150
- Pekerja 5.198 5.198 - Hok 100,000 519,750 - 519,750
- Tukang 0.866 0.866 - Hok 120,000 103,950 - 103,950
* Pembesian 263.176
- Pekerja 1.842 1.842 - Hok 100,000 184,224 - 184,224
- Tukang 1.842 1.842 - Hok 120,000 221,068 - 221,068
* Bekisting 4.800
- Pekerja 4.386 1.890 2.496 - Hok 100,000 438,600 - 189,000 249,600
- Tukang 1.248 1.248 - Hok 120,000 149,760 - 149,760
3.3 Kolom30x30
* Beton 3.240
- Pekerja 5.346 5.346 - Hok 100,000 534,600 - 534,600
- Tukang 0.891 0.891 - Hok 120,000 106,920 - 106,920
* Pembesian 473.433
- Pekerja 3.314 3.314 - Hok 100,000 331,403 - 331,403
- Tukang 3.314 3.314 - Hok 120,000 397,683 - - 397,683
* Bekisting 14.400 -
- Pekerja 9.504 9.504 - Hok 100,000 950,400 - 950,400
- Tukang - - Hok 120,000 - - -
3.4 Kolom 20x20 K2
* Beton 0.368
- Pekerja 0.607 0.607 - Hok 100,000 60,720 - 60,720
- Tukang 0.101 0.101 - Hok 120,000 12,144 - 12,144
* Pembesian 51.030
- Pekerja 0.357 0.357 - Hok 100,000 35,721 - 35,721
- Tukang 0.357 0.357 - Hok 120,000 42,865 - 42,865
* Bekisting 2.453
- Pekerja 1.619 1.619 - Hok 100,000 161,920 - 161,920
- Tukang 0.859 0.859 - Hok 120,000 103,040 - - 103,040
3.5 Balok 20 x 30 (B2) -
* Beton 1.776 -
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN APBDES Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5+6 3 4 5 6 7 8 9=2x8 10=3x8 11=4x8 12=5x8
- Pekerja 2.930 2.930 - Hok 100,000 293,040 - 293,040
- Tukang 0.488 0.488 - Hok 120,000 58,608 - 58,608
* Pembesian 311.711
- Pekerja 2.182 2.182 - Hok 100,000 218,198 - 218,198
- Tukang - - Hok 120,000 - - -
* Bekisting 7.893
- Pekerja 5.210 5.210 - Hok 100,000 520,960 - 520,960
- Tukang 2.605 2.605 - Hok 120,000 312,576 - 312,576
3.6 Balok 20 x 35 ( B1 )
* Beton 0.840
- Pekerja 1.386 1.386 - Hok 100,000 138,600 - 138,600
- Tukang 0.231 0.231 - Hok 120,000 27,720 - 27,720
* Pembesian 134.334
- Pekerja 0.940 0.940 - Hok 100,000 94,034 - 94,034
- Tukang 0.940 0.940 - Hok 120,000 112,841 - - 112,841
* Bekisting 3.600 -
- Pekerja 2.376 2.376 - Hok 100,000 237,600 - 237,600
- Tukang - - Hok 120,000 - - -
3.7 Sloef 20 x 30 ( S1 )
* Beton 0.720
- Pekerja 1.188 1.188 - Hok 100,000 118,800 - 118,800
- Tukang 0.198 0.198 - Hok 120,000 23,760 - 23,760
* Pembesian 145.859
- Pekerja - - - Hok 100,000 - - -
- Tukang - - Hok 120,000 - - -
* Bekisting 2.400
- Pekerja 1.584 1.584 - Hok 100,000 158,400 - 158,400
- Tukang 0.792 0.792 - Hok 120,000 95,040 - - 95,040
3.8 Ringbalk 20 x 25 ( RB2 ) -
* Beton 0.600 -
- Pekerja 0.990 0.990 - Hok 100,000 99,000 - 99,000
- Tukang 0.165 0.165 - Hok 120,000 19,800 - 19,800
* Pembesian 68.397
- Pekerja - - - Hok 100,000 - - -
- Tukang - - Hok 120,000 - - -
* Bekisting 2.000
- Pekerja 1.320 1.320 - Hok 100,000 132,000 - 132,000
- Tukang - - Hok 120,000 - - -
3.9 Plat Lantai t. 15 cm
* Beton 1.536
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN APBDES Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5+6 3 4 5 6 7 8 9=2x8 10=3x8 11=4x8 12=5x8
- Pekerja 2.534 2.534 - Hok 100,000 253,440 - 253,440
- Tukang 0.422 0.422 - Hok 120,000 50,688 - 50,688
* Pembesian 149.996 -
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN APBDES Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5+6 3 4 5 6 7 8 9=2x8 10=3x8 11=4x8 12=5x8
- Pekerja 1.050 - 1.050 - Hok 100,000 104,997 - - 104,997
- Tukang 1.050 1.050 - Hok 120,000 125,997 - - 125,997
* Bekisting 4.267 -
- Pekerja 2.816 - 2.816 - Hok 100,000 281,600 - - 281,600
- Tukang 1.408 1.408 - Hok 120,000 168,960 - 168,960
3.10 Dinding Beton t. 15 cm
* Beton 4.416
- Pekerja 15.021 15.021 4.48 - Hok 100,000 1,502,106 - 1,502,106 448,000.00
- Tukang 1.214 1.214 - Hok 120,000 145,728 - 145,728
* Pembesian 431.238
- Pekerja 3.019 3.019 - Hok 100,000 301,867 - 301,867
- Tukang 3.019 3.019 - Hok 120,000 362,240 - 362,240
* Bekisting 19.627
- Pekerja 12.954 12.954 - Hok 100,000 1,295,360 - 1,295,360
- Tukang - - - Hok 120,000 - - -
3.11 Plat Atap t. 12 cm
* Beton 1.685
- Pekerja 2.780 2.780 - Hok 100,000 278,042 - 278,042
- Tukang - - - Hok 120,000 - - -
* Pembesian 232.920
- Pekerja - - - Hok 100,000 - - -
- Tukang 1.630 1.630 - Hok 120,000 195,653 - 195,653
* Bekisting 4.129 -
- Pekerja 2.725 2.725 - Hok 100,000 272,489 - 272,489
- Tukang 1.362 1.362 - Hok 120,000 163,494 - - 163,494
D. PEKERJAAN FINISHING -
4.1 Plesteran 151.960 -
- Pekerja 60.784 12.960 47.824 - Hok 100,000 6,078,400 - 1,296,000 4,782,400
- Tukang 30.392 30.392 - Hok 120,000 3,647,040 - - 3,647,040
4.2 Acian 151.960 -
- Pekerja 30.392 - 30.392 - Hok 100,000 3,039,200 - - 3,039,200
- Tukang - - Hok 120,000 - - - -
5.5 Pengecetan 151.960 -
- Pekerja 3.039 3.039 - Hok 100,000 303,920 - 303,920
- Tukang 7.340 7.340 2.23 - Hok 120,000 880,818 - 880,818 268,000.00
E. PEKERJAAN PIPA -
5.1 Pek. Pipa GIP 78.000 -
- Pekerja - - Hok 100,000 - - - -
- Tukang - - Hok 120,000 - - -
Sub Total 2) 29,412,277 - 8,370,843 21,757,433
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN APBDES Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5+6 3 4 5 6 7 8 9=2x8 10=3x8 11=4x8 12=5x8
Dibuatkan 30,128,400 - 8,371,000 21,757,400
Jumlah Total) 102,374,400 - 15,930,000 86,444,400

Alelebbae Juni 2019

Disetujui Oleh : Didampingi oleh : Dibuat Oleh :


Ketua DPMU Kabupaten Wajo KKM " ALELEBBAE " Fasilitator Masyarakat Pelaksana Pamsimas

( MUH. TAUFIQ, ST ) (UNU) ( GULBUDIN HETMATIAR ) SAHARUDDIN


NIP : 19750717 2009 02 1003 Koordinator FM-WSS Ketua SATLAK
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN APBDES Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5+6 3 4 5 6 7 8 9=2x8 10=3x8 11=4x8 12=5x8
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN APBDES Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5+6 3 4 5 6 7 8 9=2x8 10=3x8 11=4x8 12=5x8
Balok Kayu Kls. II 1.021 0.25 2,200,000 2,245,194 Rp 554,400
Balok Kayu Kls. III 0.037 2,200,000 80,960
Bambu 158.55 35,000 5,549,078
Bambu 34.00 35,000 1,190,000
Batu pecah 2/3 cm 15.00 350,000 5,250,000
Besi beton Polos Ø 10 33.00 60,000 1,980,000
Besi beton Polos Ø 12 65.00 87,000 5,655,000
Besi beton Polos Ø 14 80.00 145,000 11,600,000
Besi beton Polos Ø 8 59.00 45,000 2,655,000
Cat Besi 6.00 57,000 342,000
Cat dasar 15.00 65,000 975,000
Cat Meni Besi 3.00 45,000 135,000
Cat tembok 40.00 65,000 2,600,000
Kawat beton 36.00 20,000 720,000
Kayu klas III uk. 5/7 0.372 2,200,000 818,400
Kayu papan kls. III 3/20 0.090 2,500,000 224,000
Lem Pipa 2.00 50,000 100,000
Plamir tembok 66.00 5,000 330,000
Seal Tape 11.00 5,000 55,000
Paku biasa 2" - 5" 25.87 20,000 517,400
Pasir beton 10.00 110,000 1,100,000
Pasir pasang 8.00 100,000 800,000
Pasir urug 2.00 100,000 200,000
Semen Portland 167.00 65,000 10,855,000
Tripleks 6 mm 65,000 -
Tripleks 9 mm 26.00 110,000 2,860,000
Penutup Man Hole Besi Plat 80 x 80 1.00 600,000 600,000
Pipa inlet GIP Ø 1 1/2" Medium A 2.00 527,000 1,054,000
Pipa outlet GIP Ø 3" Medium A 2.00 720,000 1,440,000
Pipa peluap GIP Ø 2" Medium A - 527,000 -
Pipa penguras GIP Ø 1 1/2" Medium A 1.00 720,000 720,000
Pipa Vent Gip Ø 1/2" - 327,000 -
Sock Drat luar PVC SNI Ø 1 1/2" 2.00 15,000 30,000
Sock Drat luar PVC SNI Ø 2" 1.00 38,000 38,000
Socket GIP Ø 1 1/2" 1.00 37,000 37,000
Socket GIP Ø 2" 1.00 43,000 43,000
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN APBDES Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5+6 3 4 5 6 7 8 9=2x8 10=3x8 11=4x8 12=5x8
Socket GIP Ø 3" - 104,000 -
Sock Drat Luar PVC SNI Ø 3" - 103,000 -
Tangga Monyet Pipa GIP Ø ¾" 1.00 2,000,000 2,000,000
Tee PVC Ø 3" 1.00 50,000 50,000
Gate valve PVC Ø 3" - 300,000 -
Gate valve GIP Ø 1 1/2" 1.00 300,000 300,000
Gate valve GIP Ø 2" 1.00 493,000 493,000
Knee 90° GIP Ø 1 1/2" 4.00 40,000 160,000
Knee 90° GIP Ø 2" 1.00 56,000 56,000
Knee 90° GIP Ø 3" - 156,000 -
Knee 90° PVC Ø 3" - 0 -

Pengadaa APD masker untuk tukang dan pekerja - 10,000 -


Pengadaa APD Kaos tangan untuk tukang dan pekerja - 10,000 -
Termometer gun - 1,000,000 -
Desinpektan - 120,000 -
57,498,400
56,489,400.000 57,498,400
upah
Tukang 67.00 120,000 8,040,000.00
Tukang 11.000 120,000 -
Pekerja 153.00 100,000 15,300,000.00
Pekerja 73.00 100,000 7,300,000.00

23,340,000.00

167.03 80,838,400.00
RENCANA ANGGARAN BIAYA

Nomor RAB : Sub pekerjaan/Kegiatan : Reservoir


Pekerjaan Kegiatan : Sarana Air Minum Ukuran/Dimensi : 2,8 x 2,8 x 2,1 m
Kapasitas : 16 m³
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5+6 3 4 5 7 8 9=2x8 10=3x8 11=4x8 12=5x8 Koefisien
1 PENGADAAN APD 1,720,000
- Pengadaan Masker Untuk Tukang dan Pekerja 18.00 18 Bh 10,000 180,000 180,000
- Pengadaan Kaos Tangan Untuk Tukang dan Pekerja 18.00 18 Bh 10,000 180,000 180,000
- Pengadaan Termometer Gun 1.00 1 Bh 1,000,000 1,000,000 1,000,000
- Pengadaan Desinfektan 3.00 3 ltr 120,000 360,000 360,000
1 BAHAN
A. PEKERJAAN PENDAHULUAN
1.1 Pemasangan Bowplank 12.80
- Kayu klas III uk. 5/7 0.180 0.180 M³ 2,800,000 504,000 - 504,000 3,665,779 0.012
- Paku biasa 2" - 5" 0.256 0.256 Kg 22,000 5,632 - - 5,632 #REF! 0.020
- Kayu papan kls. III 3/20 0.090 0.090 M³ 3,244,000 290,662 - 290,662 800,294 0.007
B. PEKERJAAN TANAH -
2.1 Urugan Pasir 1.101 -
- Pasir urug 1.469 1.469 M³ 242,000 355,450 - - 355,450 355,450 1.200
C. PEKERJAAN BETON -
3.1 Lantai Kerja t. 5 cm 0.612 -
- Semen Portland 140.760 140.760 M³ 1,340 188,618 - - 188,618 #REF! 230.000
- Pasir beton 0.390 0.390 M³ 306,000 119,453 - - 119,453 #REF! 0.638
- Batu pecah 2/3 cm 0.466 0.466 M³ 591,000 275,154 - - 275,154 #REF! 0.761
3.2 Pondasi Poor Plat 1,5 x 1,5 -
* Beton 3.150 -
- Semen portland 1,108.800 1,108.800 Kg 1,340 1,485,792 - - 1,485,792 352.000
- Pasir Beton 1.645 1.645 M³ 306,000 503,294 - - 503,294 0.522
- Batu pecah 2/3 cm 2.406 2.406 M³ 591,000 1,421,749 - - 1,421,749 0.764
* Pembesian 263.176 -
- Besi beton Polos Ø 14 276.335 276.335 Kg 15,840 4,377,212 - - 4,377,212 18,397,740 1.050
- Kawat beton 3.948 3.948 Kg 23,000 90,796 - - 90,796 #REF! 0.015
* Bekisting 4.800 -
- Kayu kls. III 0.192 0.192 M³ 3,244,000 622,848 - 622,848 13 0.040
- Paku biasa 2" - 5" 1.440 1.440 Kg 22,000 31,680 - - 31,680 18 0.300
3.3 Kolom 40x40 -
* Beton 3.240 -
- Semen portland 1,140.480 1,140.480 Kg 1,340 1,528,243 - - 1,528,243 352.000
- Pasir Beton 1.692 1.692 M³ 306,000 517,673 - - 517,673 0.522
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5+6 3 4 5 7 8 9=2x8 10=3x8 11=4x8 12=5x8 Koefisien
- Batu pecah 2/3 cm 2.474 2.474 M³ 591,000 1,462,370 - 1,462,370 0.764
* Pembesian 473.433 -
- Besi beton Polos Ø 14 387.732 387.732 Kg 15,840 6,141,763 - - 6,141,763 1,161 1.050
- Besi beton Polos Ø 8 109.372 109.372 Kg 15,823 1,730,570 - - 1,730,570 #REF! 1.050
- Kawat beton 7.101 7.101 Kg 23,000 163,334 - - 163,334 24 0.015
* Bekisting 14.400 -
- Kayu Kls. III - - - M³ - - - - 0.040
- Paku biasa 2" - 5" 5.760 5.760 Kg 22,000 126,720 - - 126,720 0.400
- Balok Kayu Kls. II 0.216 0.216 M³ 2,800,000 604,800 - 604,800 38,271,245 0.015
- Tripleks 9 mm 5.040 5.040 Lbr 110,000 554,400 - - 554,400 #REF! 0.350
- Bambu 21.600 21.600 Btg 31,000 669,600 - 669,600 1,193,707 2.000
3.4 Kolom 20x20 K2
* Beton 0.368
- Semen portland 129.536 129.536 Kg 1,340 173,578 - 173,578 352.000
- Pasir Beton 0.192 0.192 M³ 306,000 58,797 - 58,797 0.522
- Batu pecah 2/3 cm 0.281 0.281 M³ 591,000 166,096 166,096 0.764
* Pembesian 51.030 -
- Besi beton Polos Ø 12 35.794 35.794 Kg 15,860 567,687 - 567,687 #REF! 1.050
- Besi beton Polos Ø 8 17.787 17.787 Kg 15,823 281,436 - 281,436 278 1.050
- Kawat beton 0.765 0.765 Kg 22,000 16,840 - 16,840 0.015
* Bekisting 2.453 -
- Kayu Kls. III - - - M³ - - - 4,730 0.040
- Paku biasa 2" - 5" 0.981 0.981 Kg 22,000 21,589 - 21,589 0.400
- Balok Kayu Kls. III 0.037 0.037 M³ 2,800,000 103,040 - 103,040 0.015
- Tripleks 9 mm 0.859 0.859 Lbr 110,000 94,453 - 94,453 13 0.350
- Bambu 4.907 4.907 Btg 31,000 152,107 - 152,107 39 2.000
3.5 Balok 20 x 30 (B2) -
* Beton 1.776 -
- Semen portland 625.152 625.152 Kg 1,340 837,704 - - 837,704 352.000
- Pasir Beton 0.927 0.927 M³ 306,000 283,762 - - 283,762 0.522
- Batu pecah 2/3 cm 1.356 1.356 M³ 591,000 801,596 - - 801,596 0.764
* Pembesian 311.711 -
- Besi beton Polos Ø 14 265.551 265.551 Kg 15,860 4,211,533 - - 4,211,533 1.050
- Besi beton Polos Ø 8 61.745 61.745 Kg 15,823 976,985 - - 976,985 1.050
- Kawat beton 4.676 4.676 Kg 23,000 107,540 - - 107,540 0.015
* Bekisting 7.893 -
- Kayu Kls. III - - - M³ - - - - 0.040
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5+6 3 4 5 7 8 9=2x8 10=3x8 11=4x8 12=5x8 Koefisien
- Paku biasa 2" - 5" 3.157 - 3.157 Kg 22,000 69,461 - - 69,461 0.400
- Balok Kayu Kls. II 0.142 0.142 M³ 2,800,000 397,824 - 397,824 0.018
- Tripleks 9 mm 2.763 - 2.763 Lbr 110,000 303,893 - - 303,893 0.350
- Bambu 15.787 15.787 Btg 31,000 489,387 - 489,387 1,510,337 2.000
3.6 Balok 20 x 35 ( B1 ) -
* Beton 0.840 -
- Semen portland 295.680 295.680 Kg 1,340 396,211 - - 396,211 352.000
- Pasir Beton 0.439 0.439 M³ 306,000 134,212 - - 134,212 0.522
- Batu pecah 2/3 cm 0.642 0.642 M³ 591,000 379,133 - - 379,133 0.764
* Pembesian 134.334 -
- Besi beton Polos Ø 14 107.908 107.908 Kg 15,860 1,711,375 - - 1,711,375 1.050
- Besi beton Polos Ø 8 33.143 33.143 Kg 15,823 524,415 - - 524,415 1.050
- Kawat beton 2.015 2.015 Kg 23,000 46,345 - - 46,345 0.015
* Bekisting 3.600 -
- Kayu Kls. III - - - M³ - - - - 0.040
- Paku biasa 2" - 5" 1.440 1.440 Kg 22,000 31,680 - - 31,680 0.400
- Balok Kayu Kls. II 0.065 0.065 M³ 2,800,000 181,440 - 181,440 0.018
- Tripleks 9 mm 1.260 1.260 Lbr 110,000 138,600 - - 138,600 0.350
- Bambu 7.200 7.200 Btg 31,000 223,200 - 223,200 49 2.000
3.7 Sloef 20 x 30 ( S1 ) -
* Beton 0.720
- Semen portland 253.440 253.440 Kg 1,340 339,610 - - 339,610 352.000
- Pasir Beton 0.376 0.376 M³ 306,000 115,039 - - 115,039 0.522
- Batu pecah 2/3 cm 0.550 0.550 M³ 591,000 324,971 - - 324,971 0.764
* Pembesian 145.859 -
- Besi beton Polos Ø 14 123.323 123.323 Kg 15,860 1,955,857 - - 1,955,857 1.050
- Besi beton Polos Ø 8 29.829 29.829 Kg 15,823 471,974 - - 471,974 1.050
- Kawat beton 2.188 2.188 Kg 23,000 50,321 - - 50,321 0.015
* Bekisting 2.400 -
- Kayu Kls. III - - - M³ - - - - 0.040
- Paku biasa 2" - 5" 0.960 0.960 Kg 22,000 21,120 - - 21,120 0.400
- Balok Kayu Kls. II 0.043 0.043 M³ 2,800,000 120,960 - 120,960 0.018
- Tripleks 9 mm 0.840 0.840 Lbr 110,000 92,400 - - 92,400 0.350
- Bambu 4.800 4.800 Btg 31,000 148,800 - 148,800 2.000
3.8 Ringbalk 20 x 25 ( RB2 ) -
* Beton 0.600 -
- Semen portland 211.200 211.200 Kg 1,340 283,008 - - 283,008 352.000
- Pasir Beton 0.313 0.313 M³ 306,000 95,865 - - 95,865 0.522
- Batu pecah 2/3 cm 0.458 0.458 M³ 591,000 270,809 - - 270,809 0.764
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5+6 3 4 5 7 8 9=2x8 10=3x8 11=4x8 12=5x8 Koefisien
* Pembesian 68.397 -
- Besi beton Polos Ø 12 45.302 45.302 Kg 15,860 718,478 - - 718,478 1.050
- Besi beton Polos Ø 8 26.514 26.514 Kg 15,823 419,532 - - 419,532 1.050
- Kawat beton 1.026 1.026 Kg 23,000 23,597 - - 23,597 0.015
* Bekisting 2.000 -
- Kayu Kls. III - - - M³ - - - - 0.040
- Paku biasa 2" - 5" 0.800 0.800 Kg 22,000 17,600 - - 17,600 0.400
- Balok Kayu Kls. II 0.036 0.036 M³ 2,800,000 100,800 - 100,800 0.018
- Tripleks 9 mm 0.700 0.700 Lbr - - - - 0.350
- Bambu 4.000 - 4.000 Btg 31,000 124,000 - - 124,000 2.000
3.9 Plat Lantai t. 15 cm -
* Beton 1.536 -
- Semen portland 540.672 540.672 Kg 1,340 724,500 - - 724,500 352.000
- Pasir Beton 0.802 0.802 M³ 306,000 245,415 - - 245,415 0.522
- Batu pecah 2/3 cm 1.173 1.173 M³ 591,000 693,272 - - 693,272 0.764
* Pembesian 149.996 -
- Besi beton Polos Ø 12 157.496 157.496 Kg 15,860 2,497,821 - - 2,497,821 1.050
- Kawat beton 2.250 2.250 Kg 23,000 51,749 - - 51,749 0.015
* Bekisting 4.267 -
- Kayu Kls. III - M³ - - - - 0.040
- Paku biasa 2" - 5" 1.707 1.707 Kg 22,000 37,547 - - 37,547 0.400
- Balok Kayu Kls. II 0.064 0.064 M³ 2,800,000 179,200 - 179,200 0.015
- Tripleks 9 mm 1.493 1.493 Lbr 110,000 164,267 - - 164,267 0.350
- Bambu 25.600 25.600 Btg 31,000 793,600 - 793,600 6.000
3.10 Dinding Beton t. 15 cm -
* Beton 4.416 -
- Semen portland - Kg 1,340 - - - - 352.000
- Pasir Beton - M³ 306,000 - - - - 0.522
- Batu pecah 2/3 cm - M³ 591,000 - - - - 0.764
* Pembesian 4.416 -
- Besi beton Polos Ø 12 - Kg 15,860 - - - - 1.050
- Kawat beton - Kg 23,000 - - - - 0.015
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5+6 3 4 5 7 8 9=2x8 10=3x8 11=4x8 12=5x8 Koefisien
* Bekisting 19.627 -
- Kayu Kls. III - - M³ - - - - 0.030
- Paku biasa 2" - 5" - Kg 22,000 - - - - 0.400
- Balok Kayu Kls. II - M³ 2,800,000 - - - - 0.020
- Tripleks 9 mm - Lbr 110,000 - - - - 0.350
- Bambu - Btg 31,000 - - - 3.000
3.11 Plat Atap t. 12 cm -
* Beton 1.685 -
- Semen portland - Kg 1,340 - - - - 352.000
- Pasir Beton - M³ 306,000 - - - - 0.522
- Batu pecah 2/3 cm - M³ 591,000 - - - - 0.764
* Pembesian 232.920 -
- Besi beton Polos Ø 10 - Kg 15,802 - - - - 1.050
- Kawat beton - Kg 23,000 - - - - 0.015
* Bekisting 4.129 -
- Kayu Kls. III - - M³ - - - - 0.040
- Paku biasa 2" - 5" - Kg 22,000 - - - - 0.400
- Balok Kayu Kls. II - M³ 2,800,000 - - - 0.015
- Tripleks 9 mm - Lbr 110,000 - - - - 0.350
- Bambu - Btg 31,000 - - - 6.000
3.12 Balok Profil -
* Beton 1.167 -
- Semen portland 410.911 410.911 Kg 1,340 550,620 - - 550,620 352.000
- Pasir Beton 0.610 0.610 M³ 306,000 186,516 - - 186,516 0.522
- Batu pecah 2/3 cm 0.892 0.892 M³ 591,000 526,887 - - 526,887 0.764
* Pembesian 32.067 -
- Besi beton Polos Ø 10 33.671 33.671 Kg 15,802 532,074 - - 532,074 1.050
- Kawat beton 0.481 0.481 Kg 23,000 11,063 - - 11,063 0.015
* Bekisting 3.667 -
- Kayu Kls. III - - - M³ - - - - 0.040
- Paku biasa 2" - 5" 1.467 1.467 Kg 22,000 32,269 - - 32,269 0.400
- Balok Kayu Kls. II 0.066 0.066 M³ 2,800,000 184,898 - 184,898 0.018
- Tripleks 6 mm - Lbr 80,000 - - - - 0.350
- Bambu 7.334 7.334 Btg 31,000 227,351 - 227,351 2.000
D. PEKERJAAN FINISHING -
4.1 Plesteran 151.960 -
- Semen Portland 1,264.307 1,264.307 Kg 1,340 1,694,172 - - 1,694,172 8.320
- Pasir pasang 4.863 4.863 M³ 242,000 1,176,778 - - 1,176,778 2,870,950 0.032
4.2 Acian 151.960 -
- Semen Portland 493.870 493.870 Kg 1,340 661,786 - - 661,786 661,786 3.250
4.3 Pekerjaan Man Hole 80 x 80 -
- Penutup Man Hole Besi Plat 80 x 80 - Ls 1,335,000 - - - - - 1.000
4.4 Pipa Vent Gip Ø 1 1/2" -
- Pipa Vent Gip Ø 1 1/2" - Ls 100,000 - - - - - 1.000
4.5 Pengecatan 151.960 -
- Plamir tembok 15.196 15.196 Kg 9,000 136,764 - - 136,764 0.100
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5+6 3 4 5 7 8 9=2x8 10=3x8 11=4x8 12=5x8 Koefisien
- Cat dasar 15.196 15.196 Kg 105,000 1,595,580 - - 1,595,580 0.100
- Cat tembok 39.510 39.510 Kg 105,000 4,148,508 - - 4,148,508 0.260
4.6 Tangga Monyet -
Tangga Monyet Pipa GIP Ø ¾" 1.000 1.000 Ls 2,000,000 2,000,000 - - 2,000,000 2,000,000 1.000
D. PEKERJAAN PIPA -
- Pipa inlet GIP Ø 1 1/2" Medium A 2.000 2.000 Btg 527,000 1,054,000 - - 1,054,000 1.000
- Pipa outlet GIP Ø 2" Medium A 2.000 2.000 Btg 720,000 1,440,000 - - 1,440,000 4,460,000 1.000
- Pipa outlet GIP Ø 3" Medium A - Btg 1,180,000 - - - - 1.000
- Pipa penguras GIP Ø 2" Medium A 2.000 2.000 Btg 720,000 1,440,000 - - 1,440,000 1.000
- Pipa peluap GIP Ø 1 1/2" Medium A 1.000 1.000 Btg 527,000 527,000 - - 527,000 1.000
- Gate valve PVC Ø 3" - Bh 300,000 - - - - 1.000
- Gate valve GIP Ø 1 1/2" 1.000 1.000 Bh 493,000 493,000 - - 493,000 1.000
- Gate valve GIP Ø 2" 2.000 2.000 Bh 85,000 170,000 - - 170,000 1.000
- Knee 90° GIP Ø 3" - Bh 156,000 - - - - 1.000
- Knee 90° GIP Ø 1 1/2" 2.000 2.000 Bh 40,000 80,000 - - 80,000 1.000
- Knee 90° GIP Ø 2" 2.000 2.000 Bh 56,000 112,000 - - 112,000 1.000
- Knee 90° PVC Ø 3" - Bh 104,000 - - - - 1.000
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5+6 3 4 5 7 8 9=2x8 10=3x8 11=4x8 12=5x8 Koefisien
- Socket GIP Ø 3" - Bh 104,000 - - - - 1.000
- Socket GIP Ø 2" 2.000 2.000 Bh 43,000 86,000 - - 86,000 1.000
- Socket GIP Ø 1 1/2" 2.000 2.000 Bh 37,000 74,000 - - 74,000 1.000
- Sock Drat Luar PVC SNI Ø 3" - Bh 103,000 - - - - 1.000
- Sock Drat luar PVC SNI Ø 2" 1.000 1.000 Bh 38,000 38,000 - - 38,000 1.000
- Sock Drat luar PVC SNI Ø 1 1/2" - - Bh 15,000 - - - - 1.000
- Tee PVC Ø 2" - - Bh 50,000 - - - - 1.000
- Lem Pipa - - Klg 45,000 - - - - 1.000
- Seal Tape 8.000 8.000 Bh 5,000 40,000 - - 40,000 1.000
- Cat Meni Besi 3.000 3.000 Kg 47,000 141,000 - - 141,000 1.000
Tandon 2200 L 4.000 4.000 bh 4,000,000 16,000,000 16,000,000
- Cat Besi 6.000 6.000 Kg 36,000 216,000 - - 216,000 1.000
Sub Total 1) 86,032,111 - 3,893,130 82,138,981 86,032,111
Dibulatkan 86,032,000 - 3,894,000 82,138,000
2 UPAH
A. PEKERJAAN PENDAHULUAN

- Pekerja 2.100 2.100 Hok 100,000 210,000 - 210,000 0.100


1.2 Pemasangan Bowplank 12.800
- Pekerja 1.280 1.280 Hok 100,000 128,000 - 128,000 0.100
- Tukang 1.280 1.280 Hok 120,000 153,600 - 153,600 281,600 0.100
B. PEKERJAAN TANAH
2.1 Galian Tanah 22.950
- Pekerja 17.213 17.213 Hok 100,000 1,721,250 - 1,721,250 0.750
2.2 Urugan Pasir 1.224
- Pekerja 0.367 0.367 Hok 100,000 36,720 - 36,720 0.300
2.3 Urugan Kembali 22.950
- Pekerja 5.738 5.738 Hok 100,000 573,750 - 573,750 0.250
C. PEKERJAAN BETON
3.1 Lantai Kerja 0.612
- Pekerja 1.010 1.010 Hok 100,000 100,980 - 100,980 1.650
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5+6 3 4 5 7 8 9=2x8 10=3x8 11=4x8 12=5x8 Koefisien
- Tukang 0.168 0.168 Hok 120,000 20,196 - 20,196 121,176 0.275
3.2 Pondasi Poor Plat 1,5 x 1,5
* Beton 3.150
- Pekerja 5.198 5.198 Hok 100,000 519,750 - 519,750 1.650
- Tukang 0.866 0.866 Hok 120,000 103,950 - 103,950 623,700 0.275
* Pembesian 263.176
- Pekerja 1.842 1.842 Hok 100,000 184,224 - 184,224 0.007
- Tukang 1.842 1.842 Hok 120,000 221,068 - 221,068 405,292 0.007
* Bekisting 4.800
- Pekerja 4.386 1.890 2.496 Hok 100,000 438,600 - 189,000 249,600 0.520
- Tukang 1.248 1.248 Hok 120,000 149,760 - 149,760 588,360 0.260
3.3 Kolom 40x40
* Beton 3.240
- Pekerja 5.346 5.346 Hok 100,000 534,600 - 534,600 1.650
- Tukang 0.891 0.891 Hok 120,000 106,920 - 106,920 641,520 0.275
* Pembesian 473.433
- Pekerja 3.314 3.314 Hok 100,000 331,403 - 331,403 0.007
- Tukang 3.314 3.314 Hok 120,000 397,683 - - 397,683 729,086 0.007
* Bekisting 14.400 -
- Pekerja 9.504 9.504 Hok 100,000 950,400 - 950,400 0.660
- Tukang - Hok 120,000 - - - 950,400 0.330
3.4 Kolom 20x20 K2
* Beton 0.368
- Pekerja 0.607 0.607 Hok 100,000 60,720 - 60,720 1.650
- Tukang 0.101 0.101 Hok 120,000 12,144 - 12,144 72,864 0.275
* Pembesian 51.030
- Pekerja 0.357 0.357 Hok 100,000 35,721 - 35,721 0.007
- Tukang 0.357 0.357 Hok 120,000 42,865 - 42,865 78,586 0.007
* Bekisting 2.453
- Pekerja 1.619 1.619 Hok 100,000 161,920 - 161,920 0.660
- Tukang 0.859 0.859 Hok 120,000 103,040 - - 103,040 264,960 0.350
3.5 Balok 20 x 30 (B2) -
* Beton 1.776 -
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5+6 3 4 5 7 8 9=2x8 10=3x8 11=4x8 12=5x8 Koefisien
- Pekerja 2.930 2.930 Hok 100,000 293,040 - 293,040 1.650
- Tukang 0.488 0.488 Hok 120,000 58,608 - 58,608 351,648 0.275
* Pembesian 311.711
- Pekerja 2.182 2.182 Hok 100,000 218,198 - 218,198 0.007
- Tukang - Hok 120,000 - - - 218,198 0.007
* Bekisting 7.893
- Pekerja 5.210 5.210 Hok 100,000 520,960 - 520,960 0.660
- Tukang 2.605 2.605 Hok 120,000 312,576 - 312,576 833,536 0.330
3.6 Balok 20 x 35 ( B1 )
* Beton 0.840
- Pekerja 1.386 1.386 Hok 100,000 138,600 - 138,600 1.650
- Tukang 0.231 0.231 Hok 120,000 27,720 - 27,720 166,320 0.275
* Pembesian 134.334
- Pekerja 0.940 0.940 Hok 100,000 94,034 - 94,034 0.007
- Tukang 0.940 0.940 Hok 120,000 112,841 - - 112,841 206,875 0.007
* Bekisting 3.600 -
- Pekerja 2.376 2.376 Hok 100,000 237,600 - 237,600 0.660
- Tukang - Hok 120,000 - - - 237,600 0.330
3.7 Sloef 20 x 30 ( S1 )
* Beton 0.720
- Pekerja 1.188 1.188 Hok 100,000 118,800 - 118,800 1.650
- Tukang 0.198 0.198 Hok 120,000 23,760 - 23,760 142,560 0.275
* Pembesian 145.859
- Pekerja - - Hok 100,000 - - - 0.007
- Tukang - Hok 120,000 - - - - 0.007
* Bekisting 2.400
- Pekerja 1.584 1.584 Hok 100,000 158,400 - 158,400 0.660
- Tukang 0.792 0.792 Hok 120,000 95,040 - - 95,040 253,440 0.330
3.8 Ringbalk 20 x 25 ( RB2 ) -
* Beton 0.600 -
- Pekerja 0.990 0.990 Hok 100,000 99,000 - 99,000 1.650
- Tukang 0.165 0.165 Hok 120,000 19,800 - 19,800 118,800 0.275
* Pembesian 68.397
- Pekerja - - Hok 100,000 - - - 0.007
- Tukang - Hok 120,000 - - - - 0.007
* Bekisting 2.000
- Pekerja 1.320 1.320 Hok 100,000 132,000 - 132,000 0.660
- Tukang - Hok 120,000 - - - 132,000 0.330
3.9 Plat Lantai t. 15 cm
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5+6 3 4 5 7 8 9=2x8 10=3x8 11=4x8 12=5x8 Koefisien
* Beton 1.536
- Pekerja 2.534 2.534 Hok 100,000 253,440 - 253,440 1.650
- Tukang 0.422 0.422 Hok 120,000 50,688 - 50,688 304,128 0.275
* Pembesian 149.996 -
- Pekerja 1.050 - 1.050 Hok 100,000 104,997 - - 104,997 0.007
- Tukang 1.050 1.050 Hok 120,000 125,997 - - 125,997 230,994 0.007
* Bekisting 4.267 -
- Pekerja 2.816 - 2.816 Hok 100,000 281,600 - - 281,600 0.660
- Tukang 1.408 1.408 Hok 120,000 168,960 - 168,960 450,560 0.330
3.10 Dinding Beton t. 15 cm
* Beton 4.416
- Pekerja 10.670 10.67 Hok 100,000 1,067,000 - 1067000 - 1.650
- Tukang - Hok 120,000 - - - 1,067,000 0.275
* Pembesian 431.238
- Pekerja - Hok 100,000 - - - 0.007
- Tukang - Hok 120,000 - - - - 0.007
* Bekisting 19.627
- Pekerja - Hok 100,000 - - - 0.660
- Tukang - Hok 120,000 - - - - 0.330
3.11 Plat Atap t. 12 cm
* Beton 1.685
- Pekerja - Hok 100,000 - - - 1.650
- Tukang - Hok 120,000 - - - - 0.275
* Pembesian 232.920
- Pekerja - Hok 100,000 - - - 0.007
- Tukang - Hok 120,000 - - - - 0.007
* Bekisting 4.129 -
- Pekerja - Hok 100,000 - - - 0.660
- Tukang - Hok 120,000 - - - - - 0.330
3.12 Balok Profil -
* Beton 1.167 -
- Pekerja - Hok 100,000 - - - - 1.650
- Tukang - Hok 120,000 - - - - 0.275
* Pembesian 32.067 -
- Pekerja - Hok 100,000 - - - 0.007
- Tukang - Hok 120,000 - - - - - 0.007
* Bekisting 3.667 -
- Pekerja - Hok 100,000 - - - 0.660
- Tukang - Hok 120,000 - - - - 0.330
D. PEKERJAAN FINISHING -
4.1 Plesteran 151.960 -
- Pekerja 60.784 - 60.784 Hok 100,000 6,078,400 - - 6,078,400 0.400
- Tukang 30.392 30.392 Hok 120,000 3,647,040 - - 3,647,040 9,725,440 0.200
4.2 Acian 151.960 -
- Pekerja 30.392 - 30.392 Hok 100,000 3,039,200 - - 3,039,200 0.200
- Tukang - - Hok 120,000 - - 1,823,520 3,039,200 0.100
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5+6 3 4 5 7 8 9=2x8 10=3x8 11=4x8 12=5x8 Koefisien
5.5 Pengecetan 151.960 15.196 -
- Pekerja 3.039 3.039 Hok 100,000 303,920 - 303,920 0.020
- Tukang 9.573 9.573 Hok 120,000 1,148,818 - 1,148,818 1,452,738 0.063
E. PEKERJAAN PIPA -
5.1 Pek. Pipa GIP 78.000 -
- Pekerja 4.212 4.212 Hok 100,000 421,200 - 421,200 0.054
- Tukang 7.020 7.020 Hok 120,000 842,400 - 842,400 1,263,600 0.090
Sub Total 2) 27,493,899 - 7,419,157 21,898,262
Dibuatkan 29,318,200 - 7,420,000 21,898,200 #REF!
Jumlah Total) 115,350,200 - 11,314,000 105,756,200 80,970,421

Palippu, Juni 2020 97,108,134.843

Disetujui Oleh : Dibuat Oleh :


Ketua DPMU Kabupaten Wajo KKM "PUNCAK" Fasilitator Masyarakat Pelaksana Pamsimas

( MUH. TAUFIQ, ST ) ( ABDUL HAMID ) ( GULBUDIN HETMATIAR ) ( MUH. YAHYA)


NIP : 19750717 2009 02 1003 Koordinator FM-WSS Ketua SATLAK

Volume Harga Biaya (Rp)


URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5+6 3 4 5 7 8 9=2x8 10=3x8 11=4x8 12=5x8
Balok Kayu Kls. II 0.109 2,800,000 305,858 31,000 1,116,000.000
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5+6 3 4 5 7 8 9=2x8 10=3x8 11=4x8 12=5x8 Koefisien
Balok Kayu Kls. III 0.75 2,800,000 - 2,104,704.00 2,480,000.000
Bambu 20.00 31,000 620,000
Bambu 72.00 31,000 2,232,000.00
Batu pecah 2/3 cm 11.00 591,000 6,501,000.00
Besi beton Polos Ø 10 5.00 60,000 300,000.00
Besi beton Polos Ø 12 22.000 85,000 1,870,000.00
Besi beton Polos Ø 14 80.00 135,000 10,800,000.00
Besi beton Polos Ø 8 59.00 40,000 2,360,000.00
Cat Besi 6.00 36,000 216,000.00
Cat dasar 15.00 105,000 1,575,000.00
Cat Meni Besi 3.00 47,000 141,000.00
Cat tembok 40.00 105,000 4,200,000.00
Gate valve GIP Ø 1 1/2" 1.00 493,000 493,000.00
Gate valve GIP Ø 2" 2.00 85,000 170,000.00 23,772,730
Gate valve PVC Ø 3" - 300,000 -
Kawat beton 26.0000 23,000 598,000.00
Kayu klas III uk. 5/7 0.180 2,800,000 Rp 504,000 - 39,436.620
Kayu papan kls. III 3/20 0.090 3,244,000 Rp 290,662 -
Knee 90° GIP Ø 1 1/2" 2.00 40,000 80,000.00 23,690,930
Knee 90° GIP Ø 2" 2.00 56,000 112,000.00
Knee 90° GIP Ø 3" - 156,000 -
Knee 90° PVC Ø 3" - 104,000 -
Lem Pipa - 45,000 -
Paku biasa 2" - 5" 20.2850 22,000 446,270.00 23,690,930.000
Pasir beton 14.00 306,000 4,284,000.00
Pasir pasang 8.00 242,000 1,936,000.00
Pasir urug 1.00 242,000 242,000.00
Penutup Man Hole Besi Plat 80 x 80 - 1,335,000 -
Pipa inlet GIP Ø 1 1/2" Medium A 2.00 527,000 1,054,000.00
Pipa outlet GIP Ø 2" Medium A 2.00 720,000 1,440,000.00
Pipa outlet GIP Ø 3" Medium A - 1,180,000 -
Pipa peluap GIP Ø 1 1/2" Medium A 1.00 527,000 527,000.00
Pipa penguras GIP Ø 2" Medium A 2.00 720,000 1,440,000.00
Pipa Vent Gip Ø 1/2" - 100,000 -
Plamir tembok 20.00 9,000 180,000.00
Seal Tape 8.00 5,000 40,000.00
Semen Portland 132.00 65,000 8,580,000.00
Sock Drat luar PVC SNI Ø 2" 1.00 38,000 38,000.00
Sock Drat Luar PVC SNI Ø 3" - 103,000 -
Socket GIP Ø 1 1/2" 2.00 37,000 74,000.00
Socket GIP Ø 2" 2.00 43,000 86,000.00
Socket GIP Ø 3" - 104,000 -
Tangga Monyet Pipa GIP Ø ¾" 1.00 2,000,000 2,000,000.00
Tripleks 6 mm - 80,000 -
Tripleks 9 mm 17.00 110,000 1,870,000.00
Pengadaan Masker Untuk Tukang dan Pekerja 18.00 10,000 180,000.00
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5+6 3 4 5 7 8 9=2x8 10=3x8 11=4x8 12=5x8 Koefisien
Pengadaan Kaos Tangan Untuk Tukang dan Pekerja 18.00 10,000 180,000.00
Pengadaan Termometer Gun 1.00 1,000,000 1,000,000.00
Pengadaan Desinfektan 3.00 120,000 360,000.00
60,085,270.00 83,858,000 23,772,730.000
60,085,270.00
upah
Tukang 25.000 49.00 120,000 5,880,000.00
Pekerja 161.00 100,000 16,100,000.00
Pekerja 35.00 100,000 3,500,000.00
3,000,000 7,420,000.00
3,500,000 21,980,000.00 21,898,200 (81,800.000)
6,500,000 920,000.00
82,065,270.00 105,756,200 23,690,930.000
REKAPITULASI RENCANA ANGGARAN BIAYA
PENYEDIAAN AIR MINUM DAN SANITASI BERBASIS MASYARAKAT ( PAMSIMAS )

Harga Jumlah Harga


URAIAN Kontribusi Masyarakat Jumlah Satuan Kontribusi Masyarakat
Total APBN Total APBN
inCash inKind inCash inKind
1 2=3+4+5+6 3 4 6 7 8 9=2x7 10=3x7 11=4x7 13=6x7
1. PEKERJAAN SARANA AIR MINUM
A PENGADAAN PIPA DAN ACCESSORIES 12,965,000
- PIPA 11,565,000 6,360,000 - 5,205,000 1 Paket 11,565,000 6,360,000 - 5,205,000
- ASSESORIS 1,400,000 340,000 1,060,000 1 Paket 1,400,000 340,000 - 1,060,000
B PEMASANGAN PIPA 8,266,000
- BAHAN 400,000 - - 400,000 1 Paket 400,000 - - 400,000
- UPAH 7,866,000 - 7,866,000 - 1 Paket 7,866,000 - 7,866,000 -
C AIR TANAH DALAM (BOR 6") 17,486,000
- BAHAN 3,805,000 - - 3,805,000 1 Unit 3,805,000 - - 3,805,000
- UPAH 13,681,000 - - 13,681,000 1 Unit 13,681,000 - - 13,681,000
F RESERVOAR ( 16 m³ ) 82,614,800
- BAHAN 66,440,000 - 4,487,000 61,953,000 1 Unit 66,440,000 - 4,487,000 61,953,000
- UPAH 16,174,800 5,697,000 10,477,800 1 Unit 16,174,800 - 5,697,000 10,477,800
G GARDU LISTRIK 10,309,000
- BAHAN 7,036,000 911,000 6,125,000 1 Unit 7,036,000 - 911,000 6,125,000
- UPAH 3,273,000 1,926,000 1,347,000 1 Unit 3,273,000 1,926,000 1,347,000
G LISTRIK PLN 3500 KVA 6,136,000
- BAHAN 5,886,000 - - 5,886,000 1 Paket 5,886,000 - - 5,886,000
- UPAH 250,000 - - 250,000 1 Paket 250,000 - - 250,000
H POMPA 9,850,000
- BAHAN 9,350,000 - - 9,350,000 1 Paket 9,350,000 - - 9,350,000
- UPAH 500,000 - - 500,000 1 Paket 500,000 - - 500,000
AKSESORIS POMPA 2,186,000
2,186,000 2,186,000 1 Paket 2,186,000 2,186,000

Sub Total 1) 149,812,800 6,700,000 20,887,000 122,225,800


PEMBANGUNAN SARANA CUCI TANGAN
Pembangunan sarana CTPS di sekolah 7,408,000 7,408,000 1.00 Unit 7,408,000 7,408,000
Pembangunan sarana CTPS di Pustu 7,408,000 7,408,000 Unit - -
Sub Total 2) 7,408,000 7,408,000
2. KESEHATAN
2.1 MASYARAKAT - - - 1 Kali - - - -
2.2 SEKOLAH - - - 1 Kali - - - -
Sub Total 3) - - - -
3. PEMBERDAYAAN
3.1 PELATIHAN
A. Pelatihan Teknik 396,180 - - 396,180.00 1 Paket 396,180 - - 396,180
B. Pelatihan Administrasi Keuangan 395,880 - - 395,880.00 1 Paket 395,880 - - 395,880
C. Pelatihan PHBS Masyarakat 396,380 - - 396,380.00 1 Paket 396,380 - - 396,380
D. Pelatihan Disabilitas 396,380 - - 396,380.00 1 Paket 396,380 - - 396,380
E. Pelatihan Kelompok Pengelola Sarana (KPSPAMS) 396,380 - - 396,380.00 1 Paket 396,380 - - 396,380
3.2 OPERASIONAL
A. ATK 2,766,000 - - 2,766,000.00 1 Paket 2,766,000 - - 2,766,000
B. Transportasi 2,766,000 - - 2,766,000.00 1 Paket 2,766,000 - - 2,766,000
C. Pembuatan Dokumen 2,766,000 - - 2,766,000.00 1 Paket 2,766,000 2,766,000
Sub Total 4) 10,279,200 - - 10,279,200
Jumlah Total 1+2+3+4) 167,500,000 6,700,000 20,887,000 139,913,000

Palippu, Juni 2020


Disetujui Oleh : Didampingi oleh : Dibuat Oleh :
Ketua DPMU Kabupaten Wajo KKM "PUNCAK" Fasilitator Masyarakat Pelaksana Pamsimas
105,087,000

35,029,000

( MUH. TAUFIQ, ST ) ( ABDUL HAMID ) (GULBUDIN HEMATIAR, ST ) ( MUH. YAHYA)


Harga Jumlah Harga
URAIAN Kontribusi Masyarakat Jumlah Satuan Kontribusi Masyarakat
Total APBN Total APBN
inCash inKind inCash inKind
1 2=3+4+5+6 3 4 6 7 8 9=2x7 10=3x7 11=4x7 13=6x7
NIP : 19750717 2009 02 1003 Koordinator FM-WSS Ketua SATLAK
RENCANA ANGGARAN BIAYA

Nomor RAB : 02 Sub pekerjaan/Kegiatan : Pemasangan Pipa


Pekerjaan Kegiatan : Sarana Air Minum Dimensi : 582 m

Volume Harga Biaya (Rp)


URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5 3 4 5 6 7 8=2x7 9=3x7 10=4x7 11=5x7

1 PENGADAAN APD
Pengadaan Masker Untuk Tukang dan Pekerja 20.00 20.00 Bh 10,000 200,000 200,000
Pengadaan Kaos Tangan Untuk Tukang dan Pekerja 20.00 20.00 Bh 10,000 200,000 200,000

A. PEKERJAAN TANAH
1.1. Galian Tanah
- Pekerja 47.433 - 47.433 Hok 100,000 4,743,263 4,743,263 -
1.2. Urugan Kembali
- Pekerja 10.280 - 10.280 - Hok 100,000 1,027,984 1,027,984 -
1.3 Urugan Pasir (Upah)
- Pekerja - - - Hok 100,000 - - -
1.4 Urugan Pasir (Bahan)
- Pasir Urug - - - M3 242,000 - - -

B. PEMASANGAN PIPA
2.1 Pipa PVC Ø 3"
- Pekerja - - - Hok 100,000 - - -
2.2 Pipa PVC Ø 2"
- Pekerja 20.304 20.304 - Hok 100,000 2,030,400 2,030,400 -
2.3 Pipa PVC Ø 1 1/2"
- Pekerja 0.648 0.648 - Hok 100,000 64,800 64,800 -

Sub Total 7,866,446 - 7,866,446 400,000


Dibulatkan 7,866,000 - 7,866,000 400,000
Palippu, Juni 2020
Disetujui Oleh : Didampingi oleh : Dibuat Oleh :
Ketua DPMU Kabupaten Wajo KKM "PUNCAK" Fasilitator Masyarakat Pelaksana Pamsimas

( MUH. TAUFIQ, ST ) ( ABDUL HAMID ) (GULBUDIN HEMATIAR, ST ) ( MUH. YAHYA)


NIP : 19750717 2009 02 1003 Koordinator FM - WSS Ketua SATLAK
RENCANA ANGGARAN BIAYA

Nomor RAB : 01 Sub pekerjaan/Kegiatan : Pengadaan Pipa GIP dan PVC


Pekerjaan Kegiatan : Sarana Air Minum Dimensi : 97 Batang

Volume Harga Biaya (Rp)


URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5 3 4 5 6 7 8=2x7 9=3x7 10=4x7 11=5x7
A. BAHAN
1.1 Pipa GIP Medium A Super (6 m)
- Pipa GIP Ø 3" - - - - Btg 1,200,000 - - - -
- Pipa GIP Ø 2" Transmisi - - - - Btg 720,000 - - - -
- Pipa GIP Ø 1 1/2" - - - - Btg 527,000 - - - -
- Pipa GIP Ø 1 1/4" - - - - Btg 227,000 - - - -
1.2 Pipa PVC SNI -
- Pipa PVC S-12.5 Ø 3" - (6m) - - - Btg 265,000 - - - -
- Pipa PVC S-12.5 Ø 1 1/2" - (6m) Distribusi - - - Btg 95,000 - -
- Pipa PVC S-12.5 Ø 1 1/2" - (6m) Transmisi 3 - - 3 Btg 95,000 285,000 - - 285,000
- Pipa PVC S-12.5 Ø 2" - (6m) 94 53 - 41 Btg 120,000 11,280,000 6,360,000 - 4,920,000
- Pipa PVC S-12,5 Ø 1 1/2" - (6m) - - - - Btg 95,000 - - - -
- Pipa PVC S-12,5 Ø 1" - (6m) - - - - Btg 35,000 - - - -
- Pipa PVC S-12,5 Ø 1" - (6m) - - - Btg 35,000 - - - -
582 -
Sub Total 11,565,000 6,360,000 - 5,205,000
B. AKSESORIS PIPA

2.1 Assesoris Pipa PVC SNI


- Knee 90 PVC Ø 3" - - - Bh 105,300 - - - -
- Knee 90 PVC Ø 2" 2 - - 2 Bh 32,000 64,000 - - 64,000
- Knee 90 PVC Ø 1 1/2" 2 - - 2 Bh 17,500 35,000 - - 35,000
- Reducer PVC Ø 3" x Ø 2" - - - Bh 40,000 - - - -
- Reducer PVC Ø 2" x Ø 1 1/2" 2 - - 2 Bh 30,000 60,000 - - 60,000
- Tee PVC Ø 2" x 3" x 2" - - - - Bh 140,000 - - - -
- Tee PVC Ø 2" x 2" x 2" 2 2 - - Bh 35,000 70,000 70,000 - -
- Gate Valve PVC Ø 3'' - - - - Bh 300,000 - - - -
- Dop PVC Ø 2" 2 - - 2 Bh 60,000 120,000 - - 120,000
- Dop PVC Ø 1 1/2" 1 - - 1 Bh 12,000 12,000 - - 12,000
- Dop PVC Ø 1" - - - - Bh 8,000 - - - -
- Lem Pipa (Solvent Cement PVC) @ 500 gr 8 6 - 2 Bh 45,000 360,000 270,000 - 90,000

2.2 Biaya Mobilisasi Pipa dan Aksesoris


- Biaya Mobilisasi dari Makassar Ke Desa 97 - - 97 Paket 7,000 679,000 - - 679,000
Sub Total 1,400,000 340,000 - 1,060,000
Jumlah Total 12,965,000 6,700,000 - 6,265,000
Dibulatkan 12,965,000 6,700,000 - 6,265,000
Palippu, Juni 2020

Disetujui Oleh : Dibuat Oleh :


Ketua DPMU Kabupaten Wajo KKM "PUNCAK" Fasilitator Masyarakat Pelaksana Pamsimas

( MUH. TAUFIQ, ST ) ( ABDUL HAMID ) (GULBUDIN HEMATIAR, ST ) ( MUH. YAHYA)


NIP : 19750717 2009 02 1003 Koordinator FM - WSS Ketua SATLAK
RENCANA ANGGARAN BIAYA
Provinsi/Kabupaten-Kota/Kecamatan/Desa : Sulawesi Selatan/Wajo/Pitumpanua/Alelebbae
Nomor RAB : 05 Sub pekerjaan/Kegiatan : PMA / SGL
Pekerjaan Kegiatan : Sarana Air Minum Ukuran/Dimensi : 4 x 8 x 3,3 m

Volume Harga Biaya (Rp)


URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5 3 4 5 6 7 8=2x7 9=3x7 10=4x7 11=5x7
1. BAHAN
A. PEKERJAAN PENDAHULUAN
1.1 Pemasangan Bowplank
- Balok Kayu klas III uk. 5/5 0.120 - 0.120 M³ 2,800,000 336,042 - - 336,042
- Paku biasa 5" - 7" 0.020 0.020 Kg 22,000 440 - - 440
- Kayu papan kls. III 3/20 0.007 - 0.007 M³ 45,000 315 - - 315
B. PEKERJAAN TANAH
2.1 Urugan Pasir
- Pasir urug 1.282 - 1.28160 M³ 242,000 310,147 - - 310,147
C. PEKERJAAN PONDASI BATU GUNUNG
3.1 Pasang Batu Kosong
- Batu belah 7.920 7.920 M³ 395,000 3,128,400 - - 3,128,400
- Pasir pasang 2.851 2.851 M³ 242,000 689,990 - - 689,990
3.2 Pasang Batu Gunung
- Batu belah 10/15 cm 39.12000 39.120 M³ 395,000 15,452,400 - - 15,452,400
- Semen Portland 6,585.200 6,585.200 Kg 1,340 8,824,168 - - 8,824,168
- Pasir pasang 15.811 15.811 M³ 242,000 3,826,262 - - 3,826,262
D. PEKERJAAN BETON
4.1 Sloef 20x30
* Beton
- Semen portland 591.360 591.360 Kg 1,340 792,422 - - 792,422
- Pasir Beton 0.877 0.877 M³ 306,000 268,423 - - 268,423
- Batu pecah 2/3 cm 1.283 1.283 M³ 591,000 758,266 - - 758,266
* Pembesian
- Besi beton Polos Ø 12 157.500 157.500 Kg 15,860 2,497,889 - - 2,497,889
- Besi beton Polos Ø 8 69.300 69.300 Kg 15,823 1,096,519 - - 1,096,519
- Kawat beton 3.240 3.240 Kg 23,000 74,520 - - 74,520
* Bekisting -
- Kayu kelas III 0.189 - 0.189 M³ 2,800,000 529,200 - - 529,200
- Paku 5 - 10 cm 1.260 1.260 Kg 22,000 27,720 - - 27,720
4.2 Kolom 25x25
* Beton
- Semen portland 534.600 534.600 Kg 1,340 716,364 - - 716,364
- Pasir Beton 0.793 0.793 M³ 306,000 242,659 - - 242,659
- Batu pecah 2/3 cm 1.160 1.160 M³ 591,000 685,486 - - 685,486
* Pembesian
- Besi beton Polos Ø 12 138.600 138.600 Kg 15,860 2,198,142 - - 2,198,142
- Besi beton Polos Ø 8 60.480 60.480 Kg 15,823 956,962 - - 956,962
- Kawat beton 2.844 2.844 Kg 23,000 65,412 - - 65,412
* Bekisting -
- Paku 5 - 10 cm 2.430 2.430 Kg 22,000 53,460 - - 53,460
- Balok kayu kelas III 0.091 0.091 M³ 2,800,000 255,150 - - 255,150
- Plywood tebal 9 mm 2.126 2.126 Lbr 110,000 233,888 - - 233,888
- Bambu 12.150 - 12.150 Btg 31,000 376,650 - - 376,650
4.3 Poer Plat
* Beton
- Semen portland 190.080 190.080 Kg 1,340 254,707 - - 254,707
- Pasir Beton 0.282 0.282 M³ 306,000 86,279 - - 86,279
- Batu pecah 2/3 cm 0.412 0.412 M³ 591,000 243,728 - - 243,728
* Pembesian
- Besi beton Polos Ø 12 157.500 157.500 Kg 15,860 2,497,889 - - 2,497,889
- Kawat beton 2.250 2.250 Kg 23,000 51,750 - - 51,750
* Bekisting
- Kayu kelas III 0.036 0.036 M³ 2,800,000 100,800 - - 100,800
- Paku 5 - 10 cm 0.270 0.270 Kg 22,000 5,940 - - 5,940
4.4 Plat Beton
* Beton
- Semen portland 1,351.680 1,351.680 Kg 1,340 1,811,251 - - 1,811,251
- Pasir Beton 2.005 2.005 M³ 306,000 613,539 - - 613,539
- Batu pecah 2/3 cm 2.933 2.933 M³ 591,000 1,733,180 - - 1,733,180
* Pembesian
- Besi beton Polos Ø 10 420.840 420.840 Kg 15,802 6,650,227 - - 6,650,227
- Kawat beton 6.012 6.012 Kg 23,000 138,276 - - 138,276
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5 3 4 5 6 7 8=2x7 9=3x7 10=4x7 11=5x7
* Bekisting -
- Paku 5 - 10 cm 3.200 3.200 Kg 22,000 70,400 - - 70,400
- Balok kayu kelas III 0.120 0.120 M³ 2,800,000 336,000 - - 336,000
- Plywood tebal 9 mm 2.800 2.800 Lbr 110,000 308,000 - - 308,000
- Bambu 48.000 - 48.000 Btg 31,000 1,488,000 - - 1,488,000
E. PEKERJAAN FINISHING
5.1 Plesteran 1:2
- Semen Portland 211.507 211.507 Kg 1,340 283,420 - - 283,420
- Pasir pasang 0.632 0.632 M³ 242,000 153,041 - - 153,041
5.2 Penutup Box Valve 80 x 80
- Penutup Man Hole Besi Plat 80 x 80 1.000 1.000 Ls 300,000 300,000 - - 300,000
Sub Total 1) 61,523,722 - - 61,523,722
2. UPAH
A. PEKERJAAN PENDAHULUAN
1.1 Membersihkan Lapangan dan Peralatan
- Pekerja 1.000 1.000 Hok 100,000 100,018 - - 100,018
1.2 Pemasangan Bowplank
- Pekerja 0.100 - 0.100 Hok 100,000 10,000 - - 10,000
- Tukang 0.100 0.100 Hok 120,000 12,000 - - 12,000
B. PEKERJAAN TANAH
2.1 Galian Tanah Tebing
- Pekerja - - - Hok 100,000 - - - -
2.2 Galian Tanah Keras
- Pekerja 101.348 - 101.348 Hok 100,000 10,134,800 - - 10,134,800
2.3 Urugan Pasir
- Pekerja 0.320 0.320 Hok 100,000 32,040 - - 32,040
2.4 Urugan Tanah Kembali
- Pekerja 1.958 - 1.958 Hok 100,000 195,800 - - 195,800
C. PEKERJAAN PONDASI BATU GUNUNG
3.1 Pas. Batu Kosong
- Pekerja 5.148 - 5.148 Hok 100,000 514,800 - - 514,800
- Tukang 2.574 - 2.574 Hok 120,000 308,880 - - 308,880
3.2 Pas. Batu Gunung
- Pekerja 48.900 - 48.900 Hok 100,000 4,890,000 - - 4,890,000
- Tukang 24.450 - 24.450 Hok 120,000 2,934,000 - - 2,934,000
D. PEKERJAAN BETON
4.1 Sloef 20x30
* Beton
- Pekerja 2.772 - 2.772 Hok 100,000 277,200 - - 277,200
- Tukang 0.462 0.462 Hok 120,000 55,440 - - 55,440
* Pembesian
- Pekerja 1.512 - 1.512 Hok 100,000 151,200 - - 151,200
- Tukang 1.512 1.512 Hok 120,000 181,440 - - 181,440
* Bakesting
- Pekerja 2.184 2.184 Hok 100,000 218,400 - - 218,400
- Tukang 1.092 1.092 Hok 120,000 131,040 - - 131,040
4.2 Kolom 25x25
* Beton
- Pekerja 2.506 - 2.506 Hok 100,000 250,594 - - 250,594
- Tukang 0.418 0.418 Hok 120,000 50,119 - - 50,119
* Pembesian
- Pekerja 1.327 - 1.327 Hok 100,000 132,720 - - 132,720
- Tukang 1.327 1.327 Hok 120,000 159,264 - - 159,264
* Bakesting
- Pekerja 4.010 - 4.010 Hok 100,000 400,950 - - 400,950
- Tukang 2.005 2.005 Hok 120,000 240,570 - - 240,570
4.3 Poer Plat
* Beton
- Pekerja 0.891 - 0.891 Hok 100,000 89,100 - - 89,100
- Tukang 0.149 0.149 Hok 120,000 17,820 - - 17,820
* Pembesian
- Pekerja 1.050 - 1.050 Hok 100,000 105,000 - - 105,000
- Tukang 1.050 1.050 Hok 120,000 126,000 - - 126,000
* Bakesting
- Pekerja 0.468 - 0.468 Hok 100,000 46,800 - - 46,800
- Tukang 0.234 0.234 Hok 120,000 28,080 - - 28,080
4.4 Plat Beton
* Beton
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5 3 4 5 6 7 8=2x7 9=3x7 10=4x7 11=5x7
- Pekerja 6.336 - 6.336 Hok 100,000 633,600 - - 633,600
- Tukang 1.056 - 1.056 Hok 120,000 126,720 - - 126,720
* Pembesian
- Pekerja 2.806 - 2.806 Hok 100,000 280,560 - - 280,560
- Tukang 2.806 2.806 Hok 120,000 336,672 - - 336,672
* Bakesting
- Pekerja 5.280 - 5.280 Hok 100,000 528,000 - - 528,000
- Tukang 2.640 - 2.640 Hok 120,000 316,800 - - 316,800
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5 3 4 5 6 7 8=2x7 9=3x7 10=4x7 11=5x7
E. PEKERJAAN FINISHING
5.1 Plesteran 1:2
- Pekerja 5.304 - 5.304 Hok 100,000 530,400 - - 530,400
- Tukang 4.080 - 4.080 Hok 120,000 489,600 - - 489,600
Sub Total 2) 25,036,427 - - 25,036,427
Jumlah Total) 86,560,149 - - 86,560,149

Palippu, Juni 2020

Disetujui Oleh : Didampingi oleh : Dibuat Oleh :


Ketua DPMU Kabupaten Wajo KKM "PUNCAK" Fasilitator Masyarakat Pelaksana Pamsimas

( MUH. TAUFIQ, ST ) ( ABDUL HAMID ) ( ANDI ADRI ANSYA, ST ) ( MUH. YAHYA)


NIP : 19750717 2009 02 1003 Koordinator FM - WSS Ketua SATLAK
RENCANA ANGGARAN BIAYA
Provinsi/Kabupaten-Kota/Kecamatan/Desa : Sulawesi Selatan/Wajo/Pitumpanua/Alelebbae
Nomor RAB : 06 Sub pekerjaan/Kegiatan : Bor 3"
Pekerjaan Kegiatan : Sarana Air Minum Ukuran/Dimensi (M) : 40
Sistem : 02
Harga
URAIAN Volume Satuan Satuan Total
Rp
1 2 3 4 5=2x4
1. BAHAN

1.1 Pengadaan Pipa blank dan Pipa Screen PVC SNI Ø 3'' 40.00 M' - -
1.2 Pengadaan dan pemasangan tutup sumur Ø 3'' 1.00 Ls 500,000 500,000
1.3 Pengadaan dan pemasangan saringan screen (rang plastik & ijuk) 1.00 Ls 500,000 500,000
Total 1 1,000,000
2. UPAH
2.1 Pemboran pada segala pormasi Ø 3'' 40.00 M' 150,000 6,000,000
2.2 Pembersihan lubang dengan sirkulasi lumpur 1.00 Ls 200,000 200,000
2.3 Pemasangan casing pipa 3" 40.00 M' 10,000 400,000
2.4 Pemasangan, pembongkaran dan pemindahan instalasi pompa uji 1.00 Ls 200,000 200,000
2.5 Pemompaan uji meliputi :
a. Uji debit tetap (Long priode test) 48.00 Jam 5,000 240,000
Total 2 7,040,000
Jumlah Total 8,040,000

Palippu, Juni 2020


Disetujui Oleh : Didampingi oleh : Dibuat Oleh :
Ketua DPMU Kabupaten Wajo KKM "PUNCAK" Fasilitator Masyarakat Pelaksana Pamsimas

( MUH. TAUFIQ, ST ) ( ABDUL HAMID ) (GULBUDIN HEMATIAR, ST ) ( MUH. YAHYA)


NIP : 19750717 2009 02 1003 Koordinator FM-WSS Ketua SATLAK
RENCANA ANGGARAN BIAYA
Provinsi/Kabupaten-Kota/Kecamatan/Desa : Sulawesi Selatan/Wajo/Pitumpanua/Alelebbae
Nomor RAB : 06 Sub pekerjaan
Pekerjaan Kegiatan : Sarana Air Minum Ukura

Volume Harga
URAIAN Kontribusi Masyarakat Satuan Satuan
Total APBD Total
inCash inKind Rp
1 2=3+4+5 3 4 5 6 7 8=2x7
1 BAHAN
A. PEKERJAAN BETON
1.1. Balok 15x 25 (R)
* Beton
- Semen portland 91.280 91.280 Kg 1,340 122,315
- Pasir Beton 0.152 0.152 M³ 306,000 46,512
- Batu pecah 2/3 cm 0.213 0.213 M³ 591,000 126,133
* Pembesian
- Besi beton Polos Ø 10 24.615 24.615 Kg 15,802 388,979
- Besi beton Polos Ø 6 12.940 12.940 Kg 18,561 240,178
- Kawat beton 0.537 0.537 Kg 23,000 12,340
* Bekisting
- Kayu papan kls. 3/20 0.066 0.066 - M³ 45,000 2,961
- Paku biasa 2" - 5" 0.658 - 0.658 Kg 22,000 14,476
- Balok Kayu klas III uk. 5/7 0.030 - 0.030 M³ 2,800,000 82,908
- Tripleks 6 mm - - - Lbr 80,000 -
- Bambu 3.290 3.290 - Btg #NAME? #NAME?
1.2. Plat Lantai t. 15 cm
* Beton
- Semen portland 301.224 301.224 Kg 1,340 403,640
- Pasir Beton 0.502 0.502 M³ 306,000 153,490
- Batu pecah 2/3 cm 0.704 0.704 M³ 591,000 416,237
Volume Harga
URAIAN Kontribusi Masyarakat Satuan Satuan
Total APBD Total
inCash inKind Rp
1 2=3+4+5 3 4 5 6 7 8=2x7
* Pembesian
- Besi beton Polos Ø 8 39.235 39.235 Kg 15,823 620,813
- Kawat beton 0.561 0.561 Kg 23,000 12,892
* Bekisting
- Kayu papan kls. 3/20 - - - M³ 45,000 -
- Paku biasa 2" - 5" 0.676 0.676 Kg 22,000 14,872
- Balok Kayu klas III uk. 5/7 0.025 0.025 M³ 2,800,000 70,980
- Tripleks 6 mm 0.592 0.592 Lbr 80,000 47,320
- Bambu 10.140 10.140 - Btg #NAME? #NAME?
1.3. Kolom 15x15 (Q)
* Beton
- Semen portland 55.420 55.420 Kg 1,340 74,263
- Pasir Beton 0.092 0.092 M³ 306,000 28,239
- Batu pecah 2/3 cm 0.130 0.130 M³ 591,000 76,580
* Pembesian
- Besi beton Polos Ø 10 23.323 23.323 Kg 15,802 368,550
- Besi beton Polos Ø 6 7.346 7.346 Kg 18,561 136,343
- Kawat beton 0.438 0.438 Kg 23,000 10,077
* Bekisting
- Kayu papan kls. 3/20 0.090 - 0.090 M³ 45,000 4,032
- Paku biasa 2" - 5" 0.896 0.896 Kg 22,000 19,712
- Balok Kayu klas III uk. 5/7 0.034 - 0.034 M³ 2,800,000 94,080
- Tripleks 6 mm - - Lbr 80,000 -
- Bambu 2.240 2.240 - Btg #NAME? #NAME?
Volume Harga
URAIAN Kontribusi Masyarakat Satuan Satuan
Total APBD Total
inCash inKind Rp
1 2=3+4+5 3 4 5 6 7 8=2x7
1.4. Ringbalk 15 x 15 ( P )
* Beton
- Semen portland 20.538 20.538 Kg 1,340 27,521
- Pasir Beton 0.034 0.034 M³ 306,000 10,465
- Batu pecah 2/3 cm 0.048 0.048 M³ 591,000 28,380
* Pembesian
- Besi beton Polos Ø 10 9.588 9.588 Kg 15,802 151,515
- Besi beton Polos Ø 6 1.843 1.843 Kg 18,561 34,214
- Kawat beton 0.163 0.163 Kg 23,000 3,756
* Bekisting
- Kayu papan kls. 3/20 0.010 0.010 - M³ 45,000 432
- Paku biasa 2" - 5" 0.096 0.096 Kg 22,000 2,112
- Balok Kayu klas III uk. 5/7 0.004 0.004 M³ 2,800,000 12,096
- Tripleks 6 mm 0.084 0.084 Lbr 80,000 6,720
- Bambu 0.480 0.480 - Btg #NAME? #NAME?
1.5. Plat Atap t. 12 cm
* Beton
- Semen portland 91.606 91.606 Kg 1,340 122,752
- Pasir Beton 0.153 0.153 M³ 306,000 46,678
- Batu pecah 2/3 cm 0.214 0.214 M³ 591,000 126,583
* Pembesian
- Besi beton Polos Ø 8 17.696 17.696 Kg 15,823 280,000
- Kawat beton 0.253 0.253 Kg 23,000 5,814
Volume Harga
URAIAN Kontribusi Masyarakat Satuan Satuan
Total APBD Total
inCash inKind Rp
1 2=3+4+5 3 4 5 6 7 8=2x7
* Bekisting
- Kayu papan kls. 3/20 - - - M³ 45,000 -
- Paku biasa 2" - 5" 0.542 0.542 Kg 22,000 11,924
- Balok Kayu klas III uk. 5/7 0.020 0.020 M³ 2,800,000 56,910
- Tripleks 6 mm 0.474 0.474 Lbr 80,000 37,940
- Bambu 8.130 8.130 - Btg #NAME? #NAME?
B. PEKERJAAN DINDING
2.1. Pas.Batu Merah 1/2 (1:4)
- Bata merah 1,026.200 1,026.200 Bh 1,000 1,026,200
- Semen Portland 168.590 168.590 Kg 1,340 225,911
- Pasir pasang 0.630 0.630 M³ 242,000 152,552
2.2. Pas. Rooster
- Rooster 6.000 6.000 Bh 40,000 240,000
- Semen Portland 2.200 2.200 Kg 1,340 2,948
- Pasir pasang 0.007 0.007 M³ 242,000 1,694
C. PEKERJAAN PINTU
3.1. Pekerjaan Pintu
- Kusen Pintu 1.000 1.000 Bh 668,000 668,000
- Daun Pintu 1.000 1.000 Bh 757,000 757,000
- Engsel Kupu kupu 3.000 3.000 Bh 39,000 117,000
- Kunci Tanam 1.000 1.000 Bh 223,000 223,000
3.2. Pengecatan Bidang Kayu baru
- Cat meni 0.680 0.680 Kg 47,000 31,960
- Plamir Kayu 0.510 0.510 Kg 9,000 4,590
- Cat dasar 0.578 0.578 Kg 58,000 33,524
- Cat penutup 2 kali 0.884 0.884 Kg 58,000 51,272
Volume Harga
URAIAN Kontribusi Masyarakat Satuan Satuan
Total APBD Total
inCash inKind Rp
1 2=3+4+5 3 4 5 6 7 8=2x7
D. PEKERJAAN FINISHING
4.1. Plesteran
- Semen Portland 141.357 141.357 Kg 1,340 189,418
- Pasir pasang 0.544 0.544 M³ 87,500 47,572
4.2. Acian
- Semen Portland 55.218 55.218 Kg 1,340 73,991
4.3. Pengecatan Tembok Baru
- Plamir tembok 1.318 1.318 Kg 9,000 11,862
- Cat dasar 1.318 1.318 Kg 105,000 138,390
- Cat tembok 3.427 3.427 Kg 105,000 359,814

Sub Total 1) #NAME?


Dibulatkan #NAME?
2 UPAH
A. PEKERJAAN BETON
1.1. Balok 15x 25 (R)
* Beton
- Pekerja 0.462 0.462 - Hok 100,000 46,200
- Tukang 0.077 - 0.077 Hok 120,000 9,240
* Pembesian
- Pekerja 0.250 0.250 - Hok 100,000 25,037
- Tukang 0.250 0.250 Hok 120,000 30,044
* Bekisting
- Pekerja 2.171 2.171 - Hok 100,000 217,140
- Tukang 1.086 1.086 Hok 120,000 130,284
Volume Harga
URAIAN Kontribusi Masyarakat Satuan Satuan
Total APBD Total
inCash inKind Rp
1 2=3+4+5 3 4 5 6 7 8=2x7
1.2. Plat Lantai t. 15 cm
* Beton
- Pekerja 1.525 1.525 - Hok 100,000 152,460
- Tukang 0.254 0.254 - Hok 120,000 30,492
* Pembesian
- Pekerja 0.262 - 0.262 Hok 100,000 26,157
- Tukang 0.262 0.262 Hok 120,000 31,388
* Bekisting
- Pekerja 1.115 1.115 - Hok 100,000 111,540
- Tukang 0.558 0.558 Hok 120,000 66,924
1.3. Kolom 15x15 (Q)
* Beton
- Pekerja 0.281 0.281 - Hok 100,000 28,050
- Tukang 0.047 0.047 - Hok 120,000 5,610
* Pembesian
- Pekerja 0.204 - 0.204 Hok 100,000 20,446
- Tukang 0.204 0.204 Hok 120,000 24,535
* Bekisting
- Pekerja 1.478 - 1.478 Hok 100,000 147,840
- Tukang 0.739 0.739 Hok 120,000 88,704
1.4. Ringbalk 15 x 15 ( P )
* Beton
- Pekerja 0.104 0.104 - Hok 100,000 10,395
- Tukang 0.017 - 0.017 Hok 120,000 2,079
* Pembesian
- Pekerja 0.076 0.076 - Hok 100,000 7,621
- Tukang 0.076 0.076 Hok 120,000 9,145
Volume Harga
URAIAN Kontribusi Masyarakat Satuan Satuan
Total APBD Total
inCash inKind Rp
1 2=3+4+5 3 4 5 6 7 8=2x7
* Bekisting
- Pekerja 0.158 - 0.158 Hok 100,000 15,840
- Tukang 0.079 0.079 Hok 120,000 9,504
1.5. Plat Atap t. 12 cm
* Beton
- Pekerja 0.464 0.464 - Hok 100,000 46,365
- Tukang 0.077 0.077 - Hok 120,000 9,273
* Pembesian
- Pekerja 0.118 - 0.118 Hok 100,000 11,797
- Tukang 0.118 0.118 Hok 120,000 14,157
* Bekisting
- Pekerja 1.789 1.789 - Hok 100,000 178,860
- Tukang 0.894 0.894 Hok 120,000 107,316
B. PEKERJAAN DINDING
2.1. Pas.Batu Merah 1/2 (1:4)
- Pekerja 4.398 4.398 - Hok 100,000 439,800
- Tukang 1.466 1.466 - Hok 120,000 175,920
2.2. Pas. Rooster
- Pekerja 0.060 0.060 - Hok 100,000 6,000
- Tukang 0.020 0.020 - Hok 120,000 2,400
C. PEKERJAAN PINTU
3.1 Pekerjaan Pintu
- Pekerja 1.400 1.400 - Hok 100,000 140,000
- Tukang 4.200 4.200 - Hok 120,000 504,000
3.2 Pengecatan Bidang Kayu baru
- Pekerja 0.238 0.238 - Hok 100,000 23,800
- Tukang 0.031 0.031 - Hok 120,000 3,672
Volume Harga
URAIAN Kontribusi Masyarakat Satuan Satuan
Total APBD Total
inCash inKind Rp
1 2=3+4+5 3 4 5 6 7 8=2x7
D. PEKERJAAN FINISHING
4.1. Plesteran
- Pekerja 6.796 6.796 - Hok 100,000 679,600
- Tukang 3.398 3.398 Hok 120,000 407,760
4.2. Acian
- Pekerja 3.398 3.398 - Hok 100,000 339,800
- Tukang 1.699 1.699 Hok 120,000 203,880
4.3. Pengecatan Tembok Baru
- Pekerja 0.264 0.264 - Hok 100,000 26,360
- Tukang 0.830 0.830 - Hok 120,000 99,641

Sub Total 2) 4,667,076


Dibuatkan 4,667,100
Jumlah Total) #NAME?

Disetujui Oleh : Dibuat Oleh


Ketua DPMU Kabupaten Wajo KKM "ALELEBBAE" Fasilitator Masyarakat

( MUH. TAUFIQ, ST ) ( ABDUL HAMID ) ( SOPHIAN, ST )


NIP : 19750717 2009 02 1003 Koordinator FM - WSS
ANGGARAN BIAYA
esa : Sulawesi Selatan/Wajo/Pitumpanua/Alelebbae
Sub pekerjaan/Kegiatan : Rumah Pompa/Panel 1
Ukuran/Dimensi : 1,3 x 1,3 x 2,65 m
Kapasitas : 1 Unit
Biaya (Rp)
Kontribusi Masyarakat
APBD
inCash inKind
9=3x7 10=4x7 11=5x7

- - 122,315
- - 46,512
- - 126,133

- - 388,979
- - 240,178
- - 12,340

- 2,961 -
- - 14,476
- - 82,908
- - -
#NAME? #NAME? #NAME?

- - 403,640
- - 153,490
- - 416,237
Biaya (Rp)
Kontribusi Masyarakat
APBD
inCash inKind
9=3x7 10=4x7 11=5x7

- - 620,813
- - 12,892

- - -
- - 14,872
- - 70,980
- - 47,320
#NAME? #NAME? #NAME?

- - 74,263
- - 28,239
- 76,580

- - 368,550
- - 136,343
- - 10,077

- - 4,032
- - 19,712
- - 94,080
- - -
#NAME? #NAME? #NAME?
Biaya (Rp)
Kontribusi Masyarakat
APBD
inCash inKind
9=3x7 10=4x7 11=5x7

- - 27,521
- - 10,465
- - 28,380

- - 151,515
- - 34,214
- - 3,756

- 432 -
- - 2,112
- - 12,096
- - 6,720
#NAME? #NAME? #NAME?

- - 122,752
- - 46,678
- - 126,583

- - 280,000
- - 5,814
Biaya (Rp)
Kontribusi Masyarakat
APBD
inCash inKind
9=3x7 10=4x7 11=5x7

- - -
- - 11,924
- - 56,910
- - 37,940
#NAME? #NAME? #NAME?

- - 1,026,200
- - 225,911
- - 152,552

- - 240,000
- - 2,948
- - 1,694

- - 668,000
- - 757,000
- - 117,000
- - 223,000

- - 31,960
- - 4,590
- - 33,524
- - 51,272
Biaya (Rp)
Kontribusi Masyarakat
APBD
inCash inKind
9=3x7 10=4x7 11=5x7

- - 189,418
- - 47,572

- - 73,991

- - 11,862
- - 138,390
- - 359,814

#NAME? #NAME? #NAME?


#NAME? #NAME? #NAME?

- 46,200 -
- - 9,240

- 25,037 -
- - 30,044

- 217,140 -
- - 130,284
Biaya (Rp)
Kontribusi Masyarakat
APBD
inCash inKind
9=3x7 10=4x7 11=5x7

- 152,460 -
- 30,492 -

- - 26,157
- - 31,388

- 111,540 -
- - 66,924

- 28,050 -
- 5,610 -

- - 20,446
- - 24,535

- - 147,840
- - 88,704

- 10,395 -
- - 2,079

- 7,621 -
- - 9,145
Biaya (Rp)
Kontribusi Masyarakat
APBD
inCash inKind
9=3x7 10=4x7 11=5x7

- - 15,840
- - 9,504

- 46,365 -
- 9,273 -

- - 11,797
- - 14,157

- 178,860 -
- - 107,316

- 439,800 -
- 175,920 -

- 6,000 -
- 2,400 -

- 140,000 -
- 504,000 -

- 23,800 -
- 3,672 -
Biaya (Rp)
Kontribusi Masyarakat
APBD
inCash inKind
9=3x7 10=4x7 11=5x7

- 679,600 -
- - 407,760

- 339,800 -
- - 203,880

- 26,360 -
- 99,641 -

- 3,310,036 1,357,040
- 3,310,000 1,357,100
#NAME? #NAME? #NAME?

Alelebbae, Desember 2019

Dibuat Oleh :
Pelaksana Pamsimas

( SAHARUDDIN )
Ketua SATLAK
RENCANA ANGGARAN BIAYA
Provinsi/Kabupaten-Kota/Kecamatan/Kelurahan : Sulawesi Selatan/Wajo/Pitumpanua/Benteng
Nomor RAB : 03 Sub pekerjaan/Kegiatan : Reservoir & Gardu Listrik
Pekerjaan Kegiatan : Sarana Air Minum Ukuran/Dimensi : 2,8 x 2,8 x 2,1 m
Kapasitas : 16 m³
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5 3 4 5 6 7 8=2x7 9=3x7 10=4x7 11=5x7
1 BAHAN
A. PEKERJAAN PENDAHULUAN
1.1 Pemasangan Bowplank
- Kayu klas III uk. 5/7 0.180 0.180 - M³ 2,800,000 504,000 - 504,000 -
- Paku biasa 2" - 5" 0.256 0.256 Kg 22,000 5,632 - - 5,632
- Kayu papan kls. 3/20 0.090 0.090 - M³ 2,800,000 250,880 - 250,880 -
B. PEKERJAAN TANAH
2.1 Urugan Pasir
- Pasir urug 1.321 1.321 M³ 242,000 319,730 - - 319,730
C. PEKERJAAN BETON
3.1 Lantai Kerja t. 5 cm
- Semen Portland 140.760 140.760 M³ 1,340 188,618 - - 188,618
- Pasir beton 0.390 0.390 M³ 306,000 119,453 - - 119,453
- Batu pecah 2/3 cm 0.466 0.466 M³ 591,000 275,154 - - 275,154
3.2 Rabat Beton Lantai Dasar 10 cm
- Semen Portland 62.618 62.618 M³ 1,340 83,907 - - 83,907
- Pasir beton 0.174 0.174 M³ 306,000 53,139 - - 53,139
- Batu pecah 2/3 cm 0.207 0.207 M³ 591,000 122,403 - - 122,403
3.3 Pondasi Poor Plat 1,5 x 1,5
* Beton
- Semen portland 1,108.800 1,108.800 Kg 1,340 1,485,792 - - 1,485,792
- Pasir Beton 1.645 1.645 M³ 306,000 503,294 - - 503,294
- Batu pecah 2/3 cm 2.406 2.406 M³ 591,000 1,421,749 - - 1,421,749
* Pembesian
- Besi beton Polos Ø 14 276.335 276.335 Kg 15,840 4,377,212 - - 4,377,212
- Kawat beton 3.948 3.948 Kg 23,000 90,796 - - 90,796
* Bekisting
- Kayu kls. III 0.384 0.384 - M³ 2,800,000 1,075,200 - 1,075,200 -
- Paku biasa 2" - 5" 2.880 2.880 Kg 22,000 63,360 - - 63,360
3.4 Kolom 30x30
* Beton
- Semen portland 1,140.480 1,140.480 Kg 1,340 1,528,243 - - 1,528,243
- Pasir Beton 1.692 1.692 M³ 306,000 517,673 - - 517,673
- Batu pecah 2/3 cm 2.474 2.474 M³ 591,000 1,462,370 - 1,462,370
* Pembesian
- Besi beton Polos Ø 16 387.732 387.732 Kg 15,823 6,135,002 - - 6,135,002
- Besi beton Polos Ø 8 109.372 109.372 Kg 15,823 1,730,570 - - 1,730,570
- Kawat beton 7.101 7.101 Kg 23,000 163,334 - - 163,334
* Bekisting
- Kayu Kls. III - - - M³ 2,800,000 - - - -
- Paku biasa 2" - 5" 5.760 5.760 Kg 22,000 126,720 - - 126,720
- Balok Kayu Kls. II 0.216 - 0.216 M³ 2,800,000 604,800 - - 604,800
- Tripleks 9 mm 5.040 5.040 Lbr 110,000 554,400 - - 554,400
- Bambu 21.600 21.600 - Btg 25,000 540,000 - 540,000 -
3.5 Kolom 20x20 K2
* Beton
- Semen portland 129.536 129.536 Kg 1,340 173,578 - - 173,578
- Pasir Beton 0.192 0.192 M³ 306,000 58,797 - - 58,797
- Batu pecah 2/3 cm 0.281 0.281 M³ 591,000 166,096 - 166,096
* Pembesian
- Besi beton Polos Ø 12 35.794 35.794 Kg 15,860 567,687 - - 567,687
- Besi beton Polos Ø 8 17.787 17.787 Kg 15,823 281,436 - - 281,436
- Kawat beton 0.765 0.765 Kg 23,000 17,605 - - 17,605
* Bekisting
- Kayu Kls. III - - - M³ 2,800,000 - - - -
- Paku biasa 2" - 5" 1.472 1.472 Kg 22,000 32,384 - - 32,384
- Balok Kayu Kls. II 0.055 0.055 - M³ 2,800,000 154,560 - 154,560 -
- Tripleks 9 mm 0.859 0.859 Lbr 110,000 94,453 - - 94,453
- Bambu 3.680 3.680 - Btg 25,000 92,000 - 92,000 -
3.6 Kolom 15x15 KP
* Beton
- Semen portland 49.421 49.421 Kg 1,340 66,224 - - 66,224
- Pasir Beton 0.073 0.073 M³ 306,000 22,433 - - 22,433
- Batu pecah 2/3 cm 0.107 0.107 M³ 591,000 63,369 - 63,369
* Pembesian
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5 3 4 5 6 7 8=2x7 9=3x7 10=4x7 11=5x7
- Besi beton Polos Ø 12 24.385 24.385 Kg 15,860 386,736 - - 386,736
- Besi beton Polos Ø 8 8.617 8.617 Kg 15,823 136,348 - - 136,348
- Kawat beton 0.471 0.471 Kg 23,000 10,844 - - 10,844
* Bekisting
- Kayu Kls. III - - - M³ 2,800,000 - - - -
- Paku biasa 2" - 5" 0.749 0.749 Kg 22,000 16,474 - - 16,474
- Balok Kayu Kls. II 0.056 0.056 - M³ 2,800,000 157,248 - 157,248 -
- Tripleks 9 mm 0.655 0.655 Lbr 110,000 72,072 - - 72,072
- Bambu 1.872 1.872 - Btg 25,000 46,800 - 46,800 -
3.7 Balok 20 x 30 (B2)
* Beton
- Semen portland 625.152 625.152 Kg 1,340 837,704 - - 837,704
- Pasir Beton 0.927 0.927 M³ 306,000 283,762 - - 283,762
- Batu pecah 2/3 cm 1.356 1.356 M³ 591,000 801,596 - - 801,596
* Pembesian
- Besi beton Polos Ø 14 265.551 265.551 Kg 15,840 4,206,384 - - 4,206,384
- Besi beton Polos Ø 8 61.745 61.745 Kg 15,823 976,985 - - 976,985
- Kawat beton 4.676 4.676 Kg 23,000 107,540 - - 107,540
* Bekisting
- Kayu Kls. III - - - M³ 2,800,000 - - - -
- Paku biasa 2" - 5" 3.157 - 3.157 Kg 22,000 69,461 - - 69,461
- Balok Kayu Kls. II 0.213 0.213 - M³ 2,800,000 596,736 - 596,736 -
- Tripleks 9 mm 2.763 - 2.763 Lbr 110,000 303,893 - - 303,893
- Bambu 15.787 15.787 - Btg 25,000 394,667 - 394,667 -
3.8 Balok 20 x 35 ( B1 )
* Beton
- Semen portland 295.680 295.680 Kg 1,340 396,211 - - 396,211
- Pasir Beton 0.439 0.439 M³ 306,000 134,212 - - 134,212
- Batu pecah 2/3 cm 0.642 0.642 M³ 591,000 379,133 - - 379,133
* Pembesian
- Besi beton Polos Ø 14 107.908 107.908 Kg 15,840 1,709,283 - - 1,709,283
- Besi beton Polos Ø 8 33.143 33.143 Kg 15,823 524,415 - - 524,415
- Kawat beton 2.015 2.015 Kg 23,000 46,345 - - 46,345
* Bekisting
- Kayu Kls. III - - - M³ 2,800,000 - - - -
- Paku biasa 2" - 5" 1.440 1.440 Kg 22,000 31,680 - - 31,680
- Balok Kayu Kls. II 0.097 0.097 - M³ 2,800,000 272,160 - 272,160 -
- Tripleks 9 mm 1.260 1.260 Lbr 110,000 138,600 - - 138,600
- Bambu 7.200 7.200 - Btg 25,000 180,000 - 180,000 -
3.9 Sloef 20 x 30 ( S1 )
* Beton
- Semen portland 323.136 323.136 Kg 1,340 433,002 - - 433,002
- Pasir Beton 0.479 0.479 M³ 306,000 146,674 - - 146,674
- Batu pecah 2/3 cm 0.701 0.701 M³ 591,000 414,338 - - 414,338
* Pembesian
- Besi beton Polos Ø 14 156.818 156.818 Kg 15,840 2,484,037 - - 2,484,037
- Besi beton Polos Ø 8 38.032 38.032 Kg 15,823 601,766 - - 601,766
- Kawat beton 2.784 2.784 Kg 23,000 64,022 - - 64,022
* Bekisting
- Kayu Kls. III - - - M³ 2,800,000 - - - -
- Paku biasa 2" - 5" 2.448 2.448 Kg 22,000 53,856 - - 53,856
- Balok Kayu Kls. II 0.110 0.110 - M³ 2,800,000 308,448 - 308,448 -
- Tripleks 9 mm 2.142 2.142 Lbr 110,000 235,620 - - 235,620
- Bambu 12.240 12.240 - Btg 25,000 306,000 - 306,000 -
3.10 Ringbalk 20 x 25 ( RB1 )
* Beton
- Semen portland 211.200 211.200 Kg 1,340 283,008 - - 283,008
- Pasir Beton 0.313 0.313 M³ 306,000 95,865 - - 95,865
- Batu pecah 2/3 cm 0.458 0.458 M³ 591,000 270,809 - - 270,809
* Pembesian
- Besi beton Polos Ø 12 45.302 45.302 Kg 15,840 717,600 - - 717,600
- Besi beton Polos Ø 8 26.514 26.514 Kg 15,823 419,532 - - 419,532
- Kawat beton 1.026 1.026 Kg 23,000 23,597 - - 23,597
* Bekisting
- Kayu Kls. III - - - M³ 2,800,000 - - - -
- Paku biasa 2" - 5" 0.800 0.800 Kg 22,000 17,600 - - 17,600
- Balok Kayu Kls. II 0.036 - 0.036 M³ 2,800,000 100,800 - - 100,800
- Tripleks 9 mm 0.700 0.700 Lbr 110,000 77,000 - - 77,000
- Bambu 4.000 4.000 - Btg 25,000 100,000 - 100,000 -
3.10 Ringbalk 20 x 25 ( RB2 )
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5 3 4 5 6 7 8=2x7 9=3x7 10=4x7 11=5x7
* Beton
- Semen portland 156.640 156.640 Kg 1,340 209,898 - - 209,898
- Pasir Beton 0.232 0.232 M³ 306,000 71,100 - - 71,100
- Batu pecah 2/3 cm 0.340 0.340 M³ 591,000 200,850 - - 200,850
* Pembesian
- Besi beton Polos Ø 12 33.744 33.744 Kg 15,840 534,509 - - 534,509
- Besi beton Polos Ø 8 19.665 19.665 Kg 15,823 311,153 - - 311,153
- Kawat beton 0.763 0.763 Kg 23,000 17,549 - - 17,549
* Bekisting
- Kayu Kls. III - - - M³ 2,800,000 - - - -
- Paku biasa 2" - 5" 0.445 0.445 Kg 22,000 9,790 - - 9,790
- Balok Kayu Kls. II 0.020 - 0.020 M³ 2,800,000 56,070 - - 56,070
- Tripleks 9 mm 0.389 0.389 Lbr 110,000 42,831 - - 42,831
- Bambu 2.225 2.225 - Btg 25,000 55,625 - 55,625 -
3.11 Plat Lantai t. 15 cm
* Beton
- Semen portland 540.672 540.672 Kg 1,340 724,500 - - 724,500
- Pasir Beton 0.802 0.802 M³ 306,000 245,415 - - 245,415
- Batu pecah 2/3 cm 1.173 1.173 M³ 591,000 693,272 - - 693,272
* Pembesian
- Besi beton Polos Ø 12 157.496 157.496 Kg 15,840 2,494,767 - - 2,494,767
- Kawat beton 2.250 2.250 Kg 23,000 51,749 - - 51,749
* Bekisting
- Kayu Kls. III - - - M³ 2,800,000 - - - -
- Paku biasa 2" - 5" 11.776 11.776 Kg 22,000 259,072 - - 259,072
- Balok Kayu Kls. II 0.442 0.442 M³ 2,800,000 1,236,480 - - 1,236,480
- Tripleks 9 mm 10.304 10.304 Lbr 110,000 1,133,440 - - 1,133,440
- Bambu 117.760 - 117.760 Btg 25,000 2,944,000 - - 2,944,000
3.12 Dinding Beton t. 15 cm
* Beton
- Semen portland 1,554.432 1,554.432 Kg 1,340 2,082,939 - - 2,082,939
- Pasir Beton 2.306 2.306 M³ 306,000 705,570 - - 705,570
- Batu pecah 2/3 cm 3.373 3.373 M³ 591,000 1,993,157 - - 1,993,157
* Pembesian
- Besi beton Polos Ø 12 452.800 452.800 Kg 15,840 7,172,455 - - 7,172,455
- Kawat beton 6.469 6.469 Kg 23,000 148,777 - - 148,777
* Bekisting
- Kayu Kls. III - - - M³ 2,800,000 - - - -
- Paku biasa 2" - 5" 11.776 11.776 Kg 22,000 259,072 - - 259,072
- Balok Kayu Kls. II 0.589 - 0.589 M³ 2,800,000 1,648,640 - - 1,648,640
- Tripleks 9 mm 10.304 10.304 Lbr 110,000 1,133,440 - - 1,133,440
- Bambu 44.160 - 44.160 Btg 25,000 1,104,000 - - 1,104,000
3.13 Plat Atap t. 12 cm
* Beton
- Semen portland 593.155 593.155 Kg 1,340 794,828 - - 794,828
- Pasir Beton 0.880 0.880 M³ 306,000 269,238 - - 269,238
- Batu pecah 2/3 cm 1.287 1.287 M³ 591,000 760,568 - - 760,568
* Pembesian
- Besi beton Polos Ø 10 244.566 244.566 Kg 15,840 3,873,979 - - 3,873,979
- Kawat beton 3.494 3.494 Kg 23,000 80,357 - - 80,357
* Bekisting
- Kayu Kls. III - - - M³ 2,800,000 - - - -
- Paku biasa 2" - 5" 1.651 1.651 Kg 22,000 36,332 - - 36,332
- Balok Kayu Kls. II 0.083 - 0.083 M³ 2,800,000 231,203 - - 231,203
- Tripleks 9 mm 1.445 1.445 Lbr 110,000 158,952 - - 158,952
- Bambu 24.772 - 24.772 Btg 25,000 619,294 - - 619,294
3.14 Balok Profil
* Beton
- Semen portland 410.911 410.911 Kg 1,340 550,620 - - 550,620
- Pasir Beton 0.610 0.610 M³ 306,000 186,516 - - 186,516
- Batu pecah 2/3 cm 0.892 0.892 M³ 591,000 526,887 - - 526,887
* Pembesian
- Besi beton Polos Ø 10 33.671 33.671 Kg 15,840 533,352 - - 533,352
- Kawat beton 0.481 0.481 Kg 23,000 11,063 - - 11,063
* Bekisting
- Kayu Kls. III - - - M³ 2,800,000 - - - -
- Paku biasa 2" - 5" 1.467 1.467 Kg 22,000 32,269 - - 32,269
- Balok Kayu Kls. II 0.066 - 0.066 M³ 2,800,000 184,814 - - 184,814
- Tripleks 6 mm 1.283 1.283 Lbr 110,000 141,177 - - 141,177
- Bambu 7.334 7.334 - Btg 25,000 183,347 - 183,347 -
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5 3 4 5 6 7 8=2x7 9=3x7 10=4x7 11=5x7
D. PEKERJAAN DINDING
4.1 Pas.Batu Merah 1/2 (1:2)
- Bata merah 781.900 781.900 Bh Err:509 Err:509 Err:509 Err:509 Err:509
- Semen Portland 211.672 211.672 Kg 1,340 283,640 - - 283,640
- Pasir pasang 0.424 0.424 m³ Err:509 Err:509 Err:509 Err:509 Err:509
4.2. Pas. Rooster
- Rooster 6.000 6.000 Bh Err:509 Err:509 Err:509 Err:509 Err:509
- Semen Portland 2.200 2.200 Kg 1,340 2,948 - - 2,948
- Pasir pasang 0.007 0.007 M³ Err:509 Err:509 Err:509 Err:509 Err:509
C. PEKERJAAN PINTU
3.1. Pekerjaan Pintu dan Jendela
- Kusen Pintu 1.000 1.000 Bh Err:509 Err:509 Err:509 Err:509 Err:509
- Kusen Jendela 1.000 1.000 Bh Err:509 Err:509 Err:509 Err:509 Err:509
- Daun Pintu 1.000 1.000 Bh Err:509 Err:509 Err:509 Err:509 Err:509
- Kaca 5mm 0.362 0.362 m2 Err:509 Err:509 Err:509 Err:509 Err:509
- Engsel Kupu kupu 3.000 3.000 Bh Err:509 Err:509 Err:509 Err:509 Err:509
- Kunci Tanam 1.000 1.000 Bh Err:509 Err:509 Err:509 Err:509 Err:509
3.2. Pengecatan Bidang Kayu baru
- Cat meni 1.232 1.232 Kg Err:509 Err:509 Err:509 Err:509 Err:509
- Plamir Kayu 0.924 0.924 Kg Err:509 Err:509 Err:509 Err:509 Err:509
- Cat dasar 1.047 1.047 Kg Err:509 Err:509 Err:509 Err:509 Err:509
- Cat penutup 2 kali 1.602 1.602 Kg Err:509 Err:509 Err:509 Err:509 Err:509
E. PEKERJAAN FINISHING
5.1 Plesteran
- Semen Portland 2,017.642 2,017.642 Kg 1,340 2,703,640 - - 2,703,640
- Pasir pasang 7.760 7.760 M³ Err:509 Err:509 Err:509 Err:509 Err:509
5.2 Acian
- Semen Portland 788.141 788.141 Kg 1,340 1,056,109 - - 1,056,109
5.3 Pekerjaan Man Hole 80 x 80
- Penutup Man Hole Besi Plat 80 x 80 1.000 1.000 Ls 300,000 300,000 - - 300,000
5.4 Pipa Vent Gip Ø 2"
- Pipa Vent Gip Ø 2" 1.000 1.000 Ls 150,000 150,000 - - 150,000
5.5 Pengecatan
- Plamir tembok 24.251 24.251 Kg 9,000 218,255 - - 218,255
- Cat dasar 24.251 24.251 Kg 105,000 2,546,303 - - 2,546,303
- Cat tembok 63.051 63.051 Kg 105,000 6,620,387 - - 6,620,387
5.6 Tangga Monyet
Tangga Monyet Pipa GIP Ø ¾" 1.000 1.000 Ls 2,000,000 2,000,000 - - 2,000,000
F. PEKERJAAN PIPA
- Pipa inlet GIP Ø 1 1/2" Medium A 2.000 2.000 Btg 720,000 1,440,000 - - 1,440,000
- Pipa outlet GIP Ø 3" Medium A 3.000 3.000 Btg 650,000 1,950,000 - - 1,950,000
- Pipa penguras GIP Ø 1 1/2" Medium A 2.000 2.000 Btg 720,000 1,440,000 - - 1,440,000
- Pipa peluap GIP Ø 1 1/2" Medium A 2.000 2.000 Btg 720,000 1,440,000 - - 1,440,000
- Gate valve GIP Ø 3" 2.000 2.000 Bh 585,000 1,170,000 - - 1,170,000
- Gate valve GIP Ø 1 1/2" 2.000 2.000 Bh 210,000 420,000 - - 420,000
- Knee 90° GIP Ø 3" 4.000 4.000 Bh 80,000 320,000 - - 320,000
- Knee 90° GIP Ø 1 1/2" 6.000 6.000 Bh 16,500 99,000 - - 99,000
- Knee 90° PVC Ø 3" 4.000 4.000 Bh 35,000 140,000 - - 140,000
- Socket GIP Ø 3" 2.000 2.000 Bh 63,500 127,000 - - 127,000
- Socket GIP Ø 1 1/2" 3.000 3.000 Bh 15,000 45,000 - - 45,000
- Sock Drat Luar PVC SNI Ø 3" 6.000 6.000 Bh 125,000 750,000 - - 750,000
- Sock Drat luar PVC SNI Ø 1 1/2" 2.000 2.000 Bh 15,000 30,000 - - 30,000
- Tee PVC Ø 3" - Bh 176,500 - - - -
- Lem Pipa 1.000 1.000 Klg 50,000 50,000 - - 50,000
- Seal Tape 5.000 5.000 Bh 5,500 27,500 - - 27,500
- Cat Meni Besi 2.000 2.000 Kg 50,000 100,000 - - 100,000
- Cat Besi 4.000 4.000 Kg 55,000 220,000 - - 220,000
G. PEKERJAAN BOX VALVE
7.1 Pasir Urug
- Pasir Urug 0.054 0.054 m³ 242,000 13,068 - - 13,068
7.2 Pas. Batu 1/2 Bata 1:4
- Bata merah 5 x 11 x 22 cm 268.800 268.800 Bh Err:509 Err:509 Err:509 Err:509 Err:509
- Semen Portland 72.768 72.768 Kg 1,340 97,509 - - 97,509
- Pasir pasang 0.146 0.146 M³ Err:509 Err:509 Err:509 Err:509 Err:509
7.3 Pek. Plesteran 1:2
- Semen Portland 63.898 63.898 Kg 1,340 85,623 - - 85,623
- Pasir pasang 0.246 0.246 M³ Err:509 Err:509 Err:509 Err:509 Err:509
7.4 Penutup Box Valve 60 x 60
- Penutup Man Hole Besi Plat 60 x 70 1.000 1.000 Ls 250,000 250,000 - - 250,000
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5 3 4 5 6 7 8=2x7 9=3x7 10=4x7 11=5x7
Sub Total 1) Err:509 Err:509 Err:509 Err:509
Dibulatkan Err:509 Err:509 Err:509 Err:509
2 UPAH
A. PEKERJAAN PENDAHULUAN
1.1 Membersihkan Lapangan dan Peralatan
- Pekerja 2.100 2.100 - Hok 66,500 139,650 - 139,650 -
1.2 Pemasangan Bowplank
- Pekerja 1.280 1.280 - Hok 66,500 85,120 - 85,120 -
- Tukang 1.280 1.280 - Hok 81,200 103,936 - 103,936 -
B. PEKERJAAN TANAH
2.1 Galian Tanah
- Pekerja 0.918 0.918 - Hok 66,500 61,047 - 61,047 -
2.2 Urugan Pasir
- Pekerja 0.367 0.367 - Hok 66,500 24,419 - 24,419 -
2.3 Urugan Kembali
- Pekerja 0.306 0.306 - Hok 66,500 20,349 - 20,349 -
C. PEKERJAAN BETON
3.1 Lantai Kerja
- Pekerja 1.010 1.010 - Hok 66,500 67,152 - 67,152 -
- Tukang 0.168 0.168 - Hok 81,200 13,666 - 13,666 -
3.2 Rabat Beton Lantai Dasar 10 cm
- Pekerja 0.449 0.449 - Hok 66,500 29,873 - 29,873 -
- Tukang 0.075 0.075 - Hok 81,200 6,079 - 6,079 -
3.3 Pondasi Poor Plat 1,5 x 1,5
* Beton
- Pekerja 5.198 5.198 - Hok 66,500 345,634 - 345,634 -
- Tukang 0.866 0.866 - Hok 81,200 70,340 - 70,340 -
* Pembesian
- Pekerja 1.842 1.842 - Hok 66,500 122,509 - 122,509 -
- Tukang 1.842 1.842 - Hok 81,200 149,589 - 149,589 -
* Bekisting
- Pekerja 4.992 4.992 - Hok 66,500 331,968 - 331,968 -
- Tukang 2.496 2.496 - Hok 81,200 202,675 - 202,675 -
3.4 Kolom 30x30
* Beton
- Pekerja 5.346 5.346 - Hok 66,500 355,509 - 355,509 -
- Tukang 0.891 0.891 - Hok 81,200 72,349 - 72,349 -
* Pembesian
- Pekerja 3.314 3.314 - Hok 66,500 220,383 - 220,383 -
- Tukang 3.314 3.314 Hok 81,200 269,099 - - 269,099
* Bekisting
- Pekerja 9.504 9.504 - Hok 66,500 632,016 - 632,016 -
- Tukang 4.752 4.752 Hok 81,200 385,862 - - 385,862
3.5 Kolom 20x20 K2
* Beton
- Pekerja 0.607 0.607 - Hok 66,500 40,379 - 40,379 -
- Tukang 0.101 0.101 - Hok 81,200 8,217 - 8,217 -
* Pembesian
- Pekerja 0.357 0.357 - Hok 66,500 23,754 - 23,754 -
- Tukang 0.357 0.357 - Hok 81,200 29,005 - 29,005 -
* Bekisting
- Pekerja 1.619 1.619 - Hok 66,500 107,677 - 107,677 -
- Tukang 0.859 0.859 Hok 81,200 69,724 - - 69,724
3.6 Kolom 15x15 KP
* Beton
- Pekerja 0.232 0.232 - Hok 66,500 15,405 - 15,405 -
- Tukang 0.039 0.039 - Hok 81,200 3,135 - 3,135 -
* Pembesian
- Pekerja 0.220 0.220 - Hok 66,500 14,631 - 14,631 -
- Tukang 0.440 0.220 0.220 Hok 81,200 35,730 - 17,865 17,865
* Bekisting
- Pekerja 0.618 0.618 - Hok 66,500 41,081 - 41,081 -
- Tukang 0.618 0.618 Hok 81,200 50,162 - - 50,162
3.7 Balok 20 x 30 (B2)
* Beton
- Pekerja 2.930 2.930 - Hok 66,500 194,872 - 194,872 -
- Tukang 0.488 0.488 - Hok 81,200 39,658 - 39,658 -
* Pembesian
- Pekerja 2.182 2.182 - Hok 66,500 145,101 - 145,101 -
- Tukang 2.182 2.182 Hok 81,200 177,176 - - 177,176
* Bekisting
- Pekerja 5.210 5.210 - Hok 66,500 346,438 - 346,438 -
- Tukang 2.605 2.605 - Hok 81,200 211,510 - 211,510 -
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5 3 4 5 6 7 8=2x7 9=3x7 10=4x7 11=5x7
3.8 Balok 20 x 35 ( B1 )
* Beton
- Pekerja 1.386 1.386 - Hok 66,500 92,169 - 92,169 -
- Tukang 0.231 0.231 - Hok 81,200 18,757 - 18,757 -
* Pembesian
- Pekerja 0.940 0.940 - Hok 66,500 62,533 - 62,533 -
- Tukang 0.940 0.940 Hok 81,200 76,356 - - 76,356
* Bekisting
- Pekerja 3.564 3.564 - Hok 66,500 237,006 - 237,006 -
- Tukang 1.782 1.782 Hok 81,200 144,698 - - 144,698
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5 3 4 5 6 7 8=2x7 9=3x7 10=4x7 11=5x7
3.9 Sloef 20 x 30 ( S1 )
* Beton
- Pekerja 1.515 1.515 - Hok 66,500 100,728 - 100,728 -
- Tukang 0.252 0.252 - Hok 81,200 20,499 - 20,499 -
* Pembesian
- Pekerja 1.299 - 1.299 Hok 66,500 86,384 - - 86,384
- Tukang 1.299 1.299 Hok 81,200 105,479 - - 105,479
* Bekisting
- Pekerja 4.039 4.039 - Hok 66,500 268,607 - 268,607 -
- Tukang 2.020 2.020 Hok 81,200 163,992 - - 163,992
3.10 Ringbalk 20 x 25 ( RB1 )
* Beton
- Pekerja 0.990 0.990 - Hok 66,500 65,835 - 65,835 -
- Tukang 0.165 0.165 - Hok 81,200 13,398 - 13,398 -
* Pembesian
- Pekerja 0.479 - 0.479 Hok 66,500 31,839 - - 31,839
- Tukang 0.479 0.479 Hok 81,200 38,877 - - 38,877
* Bekisting
- Pekerja 0.990 0.990 - Hok 66,500 65,835 - 65,835 -
- Tukang 0.495 0.495 Hok 81,200 40,194 - - 40,194
3.11 Plat Lantai t. 15 cm
* Beton
- Pekerja 2.534 2.534 - Hok 66,500 168,538 - 168,538 -
- Tukang 0.422 0.422 - Hok 81,200 34,299 - 34,299 -
* Pembesian
- Pekerja 1.050 - 1.050 Hok 66,500 69,823 - - 69,823
- Tukang 1.050 1.050 Hok 81,200 85,258 - - 85,258
* Bekisting
- Pekerja 25.907 12.954 12.954 Hok 66,500 1,722,829 - 861,414 861,414
- Tukang 6.477 6.477 - Hok 81,200 525,916 - 525,916 -
3.12 Dinding Beton t. 15 cm
* Beton
- Pekerja 7.286 7.286 - Hok 66,500 484,546 - 484,546 -
- Tukang 1.214 1.214 - Hok 81,200 98,609 - 98,609 -
* Pembesian
- Pekerja 3.019 3.019 - Hok 66,500 200,741 - 200,741 -
- Tukang 3.019 3.019 - Hok 81,200 245,116 - 245,116 -
* Bekisting
- Pekerja 12.954 12.954 - Hok 66,500 861,414 - 861,414 -
- Tukang 6.477 6.477 - Hok 81,200 525,916 - 525,916 -
3.13 Plat Atap t. 12 cm
* Beton
- Pekerja 2.780 2.780 - Hok 66,500 184,898 - 184,898 -
- Tukang 0.463 - 0.463 Hok 81,200 37,628 - - 37,628
* Pembesian
- Pekerja 1.630 - 1.630 Hok 66,500 108,424 - - 108,424
- Tukang 1.630 1.630 - Hok 81,200 132,392 - 132,392 -
* Bekisting
- Pekerja 3.633 - 3.633 Hok 66,500 241,607 - - 241,607
- Tukang 1.817 1.817 Hok 81,200 147,508 - - 147,508
3.14 Balok Profil
* Beton -
- Pekerja 1.926 - 1.926 Hok 66,500 128,089 - - 128,089
- Tukang 0.321 - 0.321 Hok 81,200 26,067 - - 26,067
* Pembesian
- Pekerja 0.224 - 0.224 Hok 66,500 14,927 - - 14,927
- Tukang 0.224 0.224 Hok 81,200 18,227 - - 18,227
* Bekisting
- Pekerja 2.420 2.420 - Hok 66,500 160,942 - 160,942 -
- Tukang 1.210 1.210 - Hok 81,200 98,259 - 98,259 -
D. PEKERJAAN DINDING
4.1 Pas.Batu Merah 1/2 (1:2)
- Pekerja 3.351 - 3.351 Hok 66,500 222,842 - - 222,842
- Tukang 1.117 1.117 Hok 81,200 90,700 - - 90,700
4.2. Pas. Rooster
- Pekerja 0.060 - 0.060 Hok 66,500 3,990 - - 3,990
- Tukang 0.020 0.020 Hok 81,200 1,624 - - 1,624
E. PEKERJAAN PINTU DAN JENDELA
3.2 Pengecatan Bidang Kayu baru
- Pekerja 0.431 0.431 - Hok 66,500 28,675 - 28,675 -
- Tukang 0.055 0.055 - Hok 81,200 4,502 - 4,502 -
E. PEKERJAAN FINISHING
5.1 Plesteran
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5 3 4 5 6 7 8=2x7 9=3x7 10=4x7 11=5x7
- Pekerja 97.002 - 97.002 Hok 66,500 6,450,633 - - 6,450,633
- Tukang 48.501 - 48.501 Hok 81,200 3,938,281 - - 3,938,281
5.2 Acian
- Pekerja 48.501 48.501 - Hok 66,500 3,225,317 - 3,225,317 -
- Tukang 24.251 24.251 - Hok 81,200 1,969,141 - 1,969,141 -
5.5 Pengecetan
- Pekerja 4.850 - 4.850 Hok 66,500 322,532 - - 322,532
- Tukang 15.278 15.278 - Hok 81,200 1,240,559 - 1,240,559 -
F. PEKERJAAN PIPA
6.1 Pek. Pipa GIP
- Pekerja 4.212 4.212 - Hok 66,500 280,098 - 280,098 -
- Tukang 7.020 - 7.020 Hok 81,200 570,024 - - 570,024
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5 3 4 5 6 7 8=2x7 9=3x7 10=4x7 11=5x7
G. PEKERJAAN BOX VALVE
7.1 Galian Tanah
- Pekerja 0.608 - 0.608 Hok 66,500 40,399 - - 40,399
7.2 Urugan Tanah -
- Pekerja 0.051 0.051 - Hok 66,500 3,367 - 3,367 -
7.3 Pas. Batu 1/2 bata 1:4
- Pekerja 1.152 1.152 - Hok 66,500 76,608 - 76,608 -
- Tukang 0.384 0.384 - Hok 81,200 31,181 - 31,181 -
7.4 Plesteran 1:2
- Pekerja 3.072 3.072 - Hok 66,500 204,288 - 204,288 -
- Tukang 1.536 1.536 - Hok 81,200 124,723 - 124,723 -
Sub Total 2) 32,047,518 - 17,009,815 15,037,703
Dibuatkan 32,047,500 - 17,009,800 15,037,700
Jumlah Total) Err:509 Err:509 Err:509 Err:509

Benteng, September 2015

Disetujui Oleh : Dibuat Oleh :


Ketua DPMU Kabupaten Wajo KKM "SEJAHTERA" Fasilitator Masyarakat Pelaksana Pamsimas

( MUH. TAUFIQ, ST ) ( H. AHMAD ) ( ANDI ADRI ANSYA, ST ) ( MUH. YUNUS )


NIP : 19750717 2009 02 1003 Koordinator FM - WSS Ketua SATLAK
RENCANA ANGGARAN BIAYA
0
Jenis Kegiatan : Pembangunan Sarana Air Minum Sub pekerjaan/Kegiatan : Pengeboran Air Tanah Dalam
Nomor RAB : 03 Ukuran / Dimensi : 65 Meter
Lokasi Kegiatan : Desa Tosora Kabupaten : Wajo
HARGA SATUAN TOTAL HARGA
NO URAIAN VOLUME SATUAN
Rp Rp
1. PEKERJAAN GEOLISTRIK 1 Ls 3,000,000.00 3,000,000.00
SUB TOTAL 1 3,000,000.00
2. PENGADAAN BAHAN
1 Pengadaan Pipa blank dan Pipa Screen PVC AW Ø 6'' 65 M' 155,000 10,075,000.00
2 Pengadaan reducer PVC Ø 6" x Ø 4 " 1 Bh 150,000 150,000.00
3 Pengadaan reducer PVC Ø 4" x Ø 2 " 1 Bh 90,000 90,000.00
4 Pengadaan dop PVC Ø 2 " 1 Bh 60,000 60,000.00
5 Pengadaan dan pemasangan tutup sumur Ø 6'' 1 Bh 2,000,000 2,000,000.00
6 Pengadaan gravel pack 1 M3 591,000 591,000.00

SUB TOTAL 2 12,966,000


3. UPAH DAN BIAYA KONSTRUKSI
1 Pengeboran Ø 2'' 65 M' 45,000 2,925,000.00
2 Pelebaran lubang bor (reaming) dari Ø 2'' menjadi Ø 6'' 65 M' 170,000 11,050,000.00
3 Pelebaran lubang bor (reaming) dari Ø 6'' menjadi Ø 8'' 65 M' 220,000 14,300,000.00
4 Pembersihan lubang dengan sirkulasi lumpur 1 Lokasi 320,000 320,000.00
5 Pemasangan Pipa blank, pipa screen PVC SNI Ø 6'' & Dop PVC 65 M' 37,000 2,405,000.00
6 Pekerjaan pengisian gravel pack 1 M3 50,000 50,000.00
7 Water jetting develoment : 1 Lokasi 350,000 350,000.00
8 Air jetting develoment : 1 Lokasi 350,000 350,000.00
9 Pekerjaan sementing mortal dan pondasi ( Lantai beton) 1 M3 300,000 300,000.00
10 Pemompaan uji meliputi :
a. Uji debit tetap (Long priode test) 24 Jam 7,000 168,000.00
b. Uji Pemulihan (Recovery) 12 Jam 7,000 84,000.00
SUB TOTAL 3 32,302,000
JUMLAH TOTAL 48,268,000
DIBULATKAN 48,268,000

Alelebbae, Desember 2019

Disetujui Oleh : Dibuat Oleh :

Ketua DPMU Kabupaten Wajo KKM "ALELEBBAE" Fasilitator Masyarakat Pelaksana Pamsimas

( MUH. TAUFIQ, ST ) (UNU) (GULBUDIN HEMATIAR, ST ) ( SAHARUDDIN )


NIP : 19750717 2009 02 1003 Koordinator FM - WSS Ketua SATLAK
RENCANA ANGGARAN BIAYA

Jenis Kegiatan : Pembangunan Sarana Air Minum Sub pekerjaan/Kegiatan : Pengeboran Air Tanah Dalam
Nomor RAB : 03 Ukuran / Dimensi : 65 Meter
Lokasi Kegiatan : Desa Tosora Kabupaten : Wajo
HARGA SATUAN TOTAL HARGA
NO URAIAN VOLUME SATUAN
Rp Rp
1 PENGADAAN APD
1 Pengadaan Masker Untuk Tukang dan Pekerja 8 Bh 10,000 80,000
2 Pengadaan Kaos Tangan Untuk Tukang dan Pekerja 8 Bh 10,000 80,000
160,000
1. PEKERJAAN GEOLISTRIK 1 Ls 3,000,000.00 3,000,000.00
SUB TOTAL 1 3,000,000.00
2. PENGADAAN BAHAN
1 Pengadaan Pipa blank dan Pipa Screen PVC AW Ø 6'' 70 M' 155,000 10,850,000.00
2 Pengadaan dop PVC Ø 6 " 1 Bh 120,000 120,000.00
3 Pengadaan dan pemasangan tutup sumur Ø 6'' 1 Bh 2,000,000 2,000,000.00
4 Pengadaan gravel pack 1 M3 591,000 591,000.00

SUB TOTAL 2 13,561,000


3. UPAH DAN BIAYA KONSTRUKSI
1 Pengeboran Segala Formasi 70 M' 45,000 3,150,000.00
2 Pelebaran lubang bor (reaming) dari Ø 2'' menjadi Ø 6'' 70 M' 170,000 11,900,000.00
3 Pelebaran lubang bor (reaming) dari Ø 6'' menjadi Ø 8'' 70 M' 220,000 15,400,000.00
4 Pembersihan lubang dengan sirkulasi lumpur 1 Lokasi 320,000 320,000.00
5 Pemasangan Pipa blank, pipa screen PVC SNI Ø 6'' & Dop PVC 70 M' 37,000 2,590,000.00
6 Pekerjaan pengisian gravel pack 1 M3 50,000 50,000.00
7 Water jetting develoment : 1 Lokasi 350,000 350,000.00
8 Air jetting develoment : 1 Lokasi 350,000 350,000.00
9 Pekerjaan sementing mortal dan pondasi ( Lantai beton) 1 M3 480,000 480,000.00
10 Pemompaan uji meliputi :
a. Uji debit tetap (Long priode test) 24 Jam 7,000 168,000.00
b. Uji Pemulihan (Recovery) 24 Jam 7,000 168,000.00
SUB TOTAL 3 34,926,000
JUMLAH TOTAL 51,647,000
DIBULATKAN 51,647,000

Palippu, Juni 2020

Disetujui Oleh : Dibuat Oleh :

Ketua DPMU Kabupaten Wajo KKM "PUNCAK" Fasilitator Masyarakat Pelaksana Pamsimas

( MUH. TAUFIQ, ST ) ( ABDUL HAMID ) (GULBUDIN HEMATIAR, ST ) ( MUH. YAHYA)


NIP : 19750717 2009 02 1003 Koordinator FM - WSS Ketua SATLAK
RENCANA ANGGARAN BIAYA

Nomor RAB : 04 Sub pekerjaan/Kegiatan : Aksesoris Bor


Pekerjaan Kegiatan : Sarana Air Minum Dimensi : 12 Batang

Volume Harga Biaya (Rp)


URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN Total APBN
inCash inKind Rp inCash inKind
1 M 2=3+4+5 3 M 4 M 5 M 6 M 7 8=2x7 9=3x7 10=4x7 11=5x7
A. BAHAN
1.2 Pipa PVC SNI
Pipa PVC AW Ø 50 - 1 1/2" 12 12.00 Btg 80,000 960,000 - - 960,000

Sub Total 960,000 - - 960,000


B. ASSESORIS PIPA
2.1 Assesoris Pipa GIP
- Knee Gip 45" 1 1/2" 2 - - 2 Bh 56,000 112,000 - - 112,000
- Knee Gip 90" 1 1/2" 1 - - 1 Bh 40,000 40,000 - - 40,000
- Chek Valve 1 1/2" 1 - - 1 Bh 350,000 350,000 - - 350,000
- Gate Valve 1 1/2" 1 - - 1 Bh 300,000 300,000 - - 300,000
- Presure 1 1/2" 1 - - 1 Bh 150,000 150,000 - - 150,000
-Water Mor 1 1/2" 1 - - 1 Bh 81,000 81,000 - - 81,000
- Tali Tambang 90 - - 90 M' 16,000 1,440,000 - - 1,440,000
- Double Neeple 1 1/2" 5 5 Bh 37,000 185,000 - - 185,000
2.2 Assesoris Pipa PVC SNI
- Scoket Drat Luar PVC 1 1/2" 2 - - 2 Bh 15,000 30,000 - - 30,000

Sub Total 2,688,000 - - 2,688,000


Jumlah Total 3,648,000 - - 3,648,000
Dibulatkan 3,648,000 - - 3,648,000
Palippu, Juni 2020

Disetujui Oleh : Dibuat Oleh :


Ketua DPMU Kabupaten Wajo KKM "PUNCAK" Fasilitator Masyarakat Pelaksana Pamsimas

( MUH. TAUFIQ, ST ) ( ABDUL HAMID ) (GULBUDIN HEMATIAR, ST ) ( MUH. YAHYA)


NIP : 19750717 2009 02 1003 Koordinator FM - WSS Ketua SATLAK
RENCANA ANGGARAN BIAYA
Provinsi/Kabupaten-Kota/Kecamatan/Desa : Sulawesi Selatan/Wajo/Pitumpanua/Alelebbae
Nomor RAB : 05 Sub pekerjaan/Kegiatan : RUMAH PANEL
Pekerjaan Kegiatan : Sarana Air Minum Ukuran/Dimensi : 1,5 x 2 m

Volume Harga Biaya (Rp)


URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5 3 4 5 7 8 9=2x8 10=3x8 11=4x8 12=5x8
1 BAHAN
A. PEKERJAAN PENDAHULUAN
1.1 Pek. Pemasangan Bowplank 4.00
- Balok Kayu klas III uk. 5/7 0.048 0.048 - m³ 2,800,000 134,400 - 134,400 -
- Paku biasa 2" - 5" 0.080 0.080 - Kg 22,000 1,760 - 1,760 -
- Papan Kayu Kls.III 3/20 0.028 0.028 - m³ 45,000 1,260 - 1,260 -
B. PEKERJAAN TANAH
2.1 Pek. Urugan Pasir dibawah Pondasi 0.228
- Pasir urug 0.273 0.273 - m³ 242,000 66,066 - 66,066 -
2.2 Pek. Urugan Pasir dibawah Lantai 0.204
- Pasir urug 0.245 0.245 - m³ 242,000 59,242 - 59,242 -
C. PEKERJAAN PONDASI BATU GUNUNG
3.1 Pas. Batu Kosong (anstamping) 0.910
- Batu belah 15/20 cm 1.092 - 1.092 m³ 395,000 431,340 - - 431,340
- Pasir urug 0.393 - 0.393 m³ 242,000 95,135 - - 95,135
3.2 Pas. Pondasi Batu Belah (1 : 3) 1.225
- Batu belah 10/15 cm 1.470 - 1.470 M³ 395,000 580,650 - - 580,650
- Semen Portland 247.212 - 247.212 Kg 1,340 331,264 - - 331,264
- Pasir pasang 0.594 - 0.594 M³ 242,000 143,778 - - 143,778
D. PEKERJAAN BETON
4.1 Pek. Lantai Kerja t. 5 cm
* Beton 0.102
- Semen portland 23.460 23.460 Kg 1,340 31,436 - - 31,436
- Pasir Beton 0.065 0.065 m³ 306,000 19,909 - - 19,909
- Batu pecah 2/3/4 cm 0.078 0.078 m³ 591,000 45,859 - - 45,859
4.2 Pek. Kolom 15 x 15
* Beton 0.270
- Semen portland 88.020 88.020 Kg 1,340 117,947 - - 117,947
- Pasir Beton 0.147 0.147 m³ 306,000 44,851 - - 44,851
- Batu pecah 2/3 cm 0.206 0.206 m³ 591,000 121,628 - 121,628
* Pembesian 19.728
- Besi beton Polos Ø 10 16.054 16.054 Kg 15,802 253,684 - - 253,684
- Besi beton Polos Ø 6 4.661 4.661 Kg 18,561 86,506 - - 86,506
- Kawat beton 0.296 0.296 Kg 23,000 6,806 - - 6,806
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5 3 4 5 7 8 9=2x8 10=3x8 11=4x8 12=5x8
* Bekisting 1.800
- Papan Kayu Kls.III 3/20 0.072 0.072 - m³ 2,800,000 201,600 - 201,600 -
- Paku biasa 2" - 5' 0.720 0.720 Kg 22,000 15,840 - - 15,840
- Balok Kayu klas III uk. 5/7 0.027 0.027 m³ 2,800,000 75,600 - - 75,600
- Tripleks 9 mm 0.630 0.630 Lbr 110,000 69,300 - - 69,300
- Bambu 3.600 3.600 - Btg 31,000 111,600 - 111,600 -
4.3 Pek. Sloef 15 x 15
* Beton 0.315
- Semen portland 102.690 102.690 Kg 1,340 137,605 - - 137,605
- Pasir Beton 0.171 0.171 m³ 306,000 52,326 - - 52,326
- Batu pecah 2/3 cm 0.240 0.240 m³ 591,000 141,899 - - 141,899
* Pembesian 22.687
- Besi beton Polos Ø 10 18.384 18.384 Kg 15,802 290,509 - - 290,509
- Besi beton Polos Ø 6 5.438 5.438 Kg 18,561 100,924 - - 100,924
- Kawat beton 0.340 0.340 Kg 23,000 7,827 - - 7,827
* Bekisting 1.050
- Papan Kayu Kls.III 3/20 0.042 0.042 - m³ 2,800,000 117,600 - 117,600 -
- Paku biasa 2" - 5' 0.420 0.420 Kg 22,000 9,240 - - 9,240
- Balok Kayu klas III uk. 5/7 0.016 0.016 m³ 2,800,000 44,100 - - 44,100
- Tripleks 9 mm 0.368 0.368 Lbr 110,000 40,425 - - 40,425
- Bambu 2.100 2.100 - Btg 31,000 65,100 - 65,100 -
4.4 Pek. Plat Atap t. 12 cm
* Beton 1.037
- Semen portland 338.055 338.055 Kg 1,340 452,994 - - 452,994
- Pasir Beton 0.563 0.563 m³ 306,000 172,257 - - 172,257
- Batu pecah 2/3 cm 0.790 0.790 m³ 591,000 467,132 - - 467,132
* Pembesian 39.324
- Besi beton Polos Ø 10 41.291 41.291 Kg 15,802 652,487 - - 652,487
- Kawat beton 0.590 0.590 Kg 23,000 13,567 - - 13,567
* Bekisting 2.850
- Papan Kayu Kls.III 3/20 0.114 0.114 m³ 2,800,000 319,155 - - 319,155
- Paku biasa 2" - 5' 1.140 1.140 Kg 22,000 25,076 - - 25,076
- Balok Kayu klas III uk. 5/7 0.043 0.043 m³ 2,800,000 119,683 - - 119,683
- Tripleks 9 mm - - Lbr 110,000 - - - -
- Bambu 5.699 5.699 - Btg 31,000 176,675 - 176,675 -
4.5 Pek. Ringbalk 15 x 15
* Beton 0.315
- Semen portland 102.690 102.690 Kg 1,340 137,605 - - 137,605
- Pasir Beton 0.171 0.171 m³ 306,000 52,326 - - 52,326
- Batu pecah 2/3/4 cm 0.240 0.240 m³ 591,000 141,899 - - 141,899
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5 3 4 5 7 8 9=2x8 10=3x8 11=4x8 12=5x8
* Pembesian 22.687
- Besi beton Polos Ø 10 18.384 18.384 Kg 15,802 290,509 - - 290,509
- Besi beton Polos Ø 6 5.438 5.438 Kg 18,561 100,924 - - 100,924
- Kawat beton 0.340 0.340 Kg 23,000 7,827 - - 7,827
* Bekisting 1.050
- Papan Kayu Kls.III 3/20 0.042 0.042 - m³ 2,800,000 117,600 - 117,600 -
- Paku biasa 2" - 5' 0.420 0.420 Kg 22,000 9,240 - - 9,240
- Balok Kayu klas III uk. 5/7 0.019 0.019 m³ 2,800,000 52,920 - - 52,920
- Tripleks 9 mm 0.368 0.368 Lbr 110,000 40,425 - - 40,425
- Bambu 2.089 2.089 - Btg 31,000 64,755 - 64,755 -
E. PEKERJAAN DINDING
5.1 Pas.Batu Merah 1/2 (1:2) 18.450
- Bata merah 1,291.500 1,291.500 Bh 1,000 1,291,500 - - 1,291,500
- Semen Portland 349.628 349.628 Kg 1,340 468,501 - - 468,501
- Pasir pasang 0.701 0.701 m³ 242,000 169,666 - - 169,666
F. PEKERJAAN PINTU
6.1 Pekerjaan Pintu dan Jendela
- Kusen Pintu 1.000 1.000 Bh 668,000 668,000 - - 668,000
- Daun Pintu 1.000 1.000 Bh 757,000 757,000 - - 757,000
- Engsel Kupu kupu 3.000 3.000 Bh 39,000 117,000 - - 117,000
- Kunci Tanam 1.000 1.000 Bh 223,000 223,000 - - 223,000
6.2 Pengecatan Bidang Kayu baru 1.520
- Cat meni 0.304 0.304 Kg 47,000 14,288 - - 14,288
- Plamir Kayu 0.228 0.228 Kg 9,000 2,052 - - 2,052
- Cat dasar 0.258 0.258 Kg 58,000 14,987 - - 14,987
- Cat penutup 2 kali 0.395 0.395 Kg 58,000 22,922 - - 22,922
G. PEKERJAAN FINISHING
7.1 Pek. Plesteran 1:2 36.900
- Semen Portland 503.021 503.021 Kg 1,340 674,048 - - 674,048
- Pasir pasang 0.996 0.996 m³ 242,000 241,105 - - 241,105
7.2 Pek. Acian 36.900
- Semen Portland 119.925 119.925 Kg 1,340 160,700 - - 160,700
7.3 Pek. Pengecatan 36.900
- Plamir tembok 3.690 3.690 Kg 9,000 33,210 - - 33,210
- Cat dasar 1 kali 3.690 3.690 Kg 105,000 387,450 - - 387,450
- Cat penutup 2 kali 9.594 9.594 Kg 105,000 1,007,370 - - 1,007,370

Sub Total 1) 13,722,872 - 1,117,658 12,605,214


Dibulatkan 13,723,000 - 1,118,000 12,605,000
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5 3 4 5 7 8 9=2x8 10=3x8 11=4x8 12=5x8
2 UPAH
A. PEKERJAAN PENDAHULUAN
1.1 Membersihkan Lapangan dan Peralatan 4.00
- Pekerja 0.400 0.400 - Hok 100,000 40,000 - 40,000 -
1.2 Pemasangan Bowplank 4.000
- Pekerja 0.400 0.400 - Hok 100,000 40,000 - 40,000 -
- Tukang 0.400 0.400 - Hok 120,000 48,000 - 48,000 -
B. PEKERJAAN TANAH
2.1 Pek. Galian Pondasi 2.503
- Pekerja - - - Hok 100,000 - - - -
2.2 Pek. Urugan Pasir dibawah Pondasi 0.228
- Pekerja 0.068 0.068 - Hok 100,000 6,825 - 6,825 -
2.3 Pek. Urugan Pasir dibawah Lantai 0.204
- Pekerja 0.061 0.061 - Hok 100,000 6,120 - 6,120 -
2.4 Urugan Kembali 1.146
- Pekerja 0.286 0.286 - Hok 100,000 28,648 - 28,648 -
C. PEKERJAAN PONDASI BATU GUNUNG
3.1 Pas. Batu Kosong (anstamping) 0.910
- Pekerja 0.710 - 0.710 Hok 100,000 70,980 - - 70,980
- Tukang 0.355 - 0.355 Hok 120,000 42,588 - - 42,588
3.2 Pas. Pondasi Batu Belah (1 : 3) 1.225
- Pekerja 1.838 - 1.838 Hok 100,000 183,750 - - 183,750
- Tukang 0.918 - 0.918 Hok 120,000 110,144 - - 110,144
D. PEKERJAAN BETON
4.1 Pek. Lantai Kerja t. 5 cm
* Beton 0.102
- Pekerja 0.168 - 0.168 Hok 100,000 16,830 - - 16,830
- Tukang 0.028 - 0.028 Hok 120,000 3,366 - - 3,366
4.2 Pek. Kolom 15 x 15
* Beton 0.270
- Pekerja 0.446 - 0.446 Hok 100,000 44,550 - - 44,550
- Tukang 0.074 - 0.074 Hok 120,000 8,910 - - 8,910
* Pembesian 19.728
- Pekerja 0.138 - 0.138 Hok 100,000 13,810 - - 13,810
- Tukang 0.138 - 0.138 Hok 120,000 16,572 - - 16,572
* Bekisting 1.800
- Pekerja 1.188 - 1.188 Hok 100,000 118,800 - - 118,800
- Tukang 0.594 0.594 Hok 120,000 71,280 - - 71,280
4.3 Pek. Sloef 15 x 15
* Beton 0.315
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5 3 4 5 7 8 9=2x8 10=3x8 11=4x8 12=5x8
- Pekerja 0.520 - 0.520 Hok 100,000 51,975 - - 51,975
- Tukang 0.087 - 0.087 Hok 120,000 10,395 - - 10,395
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5 3 4 5 7 8 9=2x8 10=3x8 11=4x8 12=5x8
* Pembesian 22.687
- Pekerja 0.159 - 0.159 Hok 100,000 15,881 - - 15,881
- Tukang 0.159 0.159 Hok 120,000 19,057 - - 19,057
* Bekisting 1.050
- Pekerja 0.693 - 0.693 Hok 100,000 69,300 - - 69,300
- Tukang 0.347 0.347 Hok 120,000 41,580 - - 41,580
4.4 Pek. Plat Atap t. 12 cm
* Beton 1.037
- Pekerja 1.711 - 1.711 Hok 100,000 171,102 - - 171,102
- Tukang 0.285 - 0.285 Hok 120,000 34,220 - - 34,220
* Pembesian 39.324
- Pekerja 0.275 - 0.275 Hok 100,000 27,527 - - 27,527
- Tukang 0.275 0.275 Hok 120,000 33,033 - - 33,033
* Bekisting 2.850
- Pekerja 1.881 - 1.881 Hok 100,000 188,074 - - 188,074
- Tukang 0.470 0.470 Hok 120,000 56,422 - - 56,422
4.5 Pek. Ringbalk 15 x 15
* Beton 0.315
- Pekerja 0.520 - 0.520 Hok 100,000 51,975 - - 51,975
- Tukang 0.087 - 0.087 Hok 120,000 10,395 - - 10,395
* Pembesian 22.687
- Pekerja 0.159 - 0.159 Hok 100,000 15,881 - - 15,881
- Tukang 0.159 0.159 Hok 120,000 19,057 - - 19,057
* Bekisting 1.050
- Pekerja 0.693 - 0.693 Hok 100,000 69,300 - - 69,300
- Tukang 0.347 0.347 Hok 120,000 41,580 - - 41,580
E. PEKERJAAN DINDING
5.1 Pas.Batu Merah 1/2 (1:2) 18.450
- Pekerja 5.535 - 5.535 Hok 100,000 553,500 - - 553,500
- Tukang 1.845 1.845 Hok 120,000 221,400 - - 221,400
F. PEKERJAAN PINTU DAN JENDELA
6.1 Pengecatan Bidang Kayu baru 1.520
- Pekerja 0.106 - 0.106 Hok 100,000 10,640 - - 10,640
- Tukang 0.014 - 0.014 Hok 120,000 1,642 - - 1,642
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5 3 4 5 7 8 9=2x8 10=3x8 11=4x8 12=5x8
G. PEKERJAAN FINISHING
7.1 Pek. Plesteran 1:2 36.900
- Pekerja 14.760 - 14.760 Hok 100,000 1,476,000 - - 1,476,000
- Tukang 7.380 - 7.380 Hok 120,000 885,600 - - 885,600
7.2 Acian 36.900
- Pekerja 7.380 - 7.380 Hok 100,000 738,000 - - 738,000
- Tukang 3.690 3.690 Hok 120,000 442,800 - - 442,800
7.3 Pengecetan 36.900
- Pekerja 0.738 - 0.738 Hok 100,000 73,800 - - 73,800
- Tukang 2.325 - 2.325 Hok 120,000 278,964 - - 278,964
Sub Total 2) 6,480,272 - 169,593 6,310,679
Dibulatkan 6,480,000 - 170,000 6,311,000
Jumlah Total) 20,203,000 - 1,288,000 18,916,000
Tosora, Desember 2018
Disetujui Oleh : Dibuat Oleh :
Ketua DPMU Kabupaten Wajo KKM "MASAGENA" Fasilitator Masyarakat Pelaksana Pamsimas

( MUH. TAUFIQ, ST ) ( ABDUL HAMID ) (GULBUDIN HEMATIAR, ST ) ( SIRAJUDDIN )


NIP : 19750717 2009 02 1003 Koordinator FM - WSS Ketua SATLAK
RINCIAN PIPA DAN ASSESORIS SESUAI SNI
PROGRAM PAMSIMAS DESA TOSORA KEC.MAJAULENG KAB. WAJO TAHUN 2019

Jenis Kegiatan/Pekerjaan
Jumlah Harga Satuan Total Harga
NO. Jenis dan Assesoris Pipa
Transmisi Distribusi PIPA APBDES Res. PMA (Btg/Bh) (Rp.) (Rp.)

1. PIPA GIP MEDIUM (6 m/Btg)


- Pipa GIP Ø 3" - - - - 1,200,000.00 -
- Pipa GIP Ø 2" 3.0 - 3.0 720,000.00 2,160,000.00
- Pipa GIP Ø 1 ½" - 2.0 2.0 527,000.00 1,054,000.00
- Pipa GIP Ø 1" - - 348,000.00 -
-
2. PIPA PVC SNI (6 m/Btg) -
- Pipa PVC Ø 3" - - - 265,000.00 -
- Pipa PVC Ø 2" - 94.0 106.0 200.0 120,000.00 24,000,000.00
- Pipa PVC Ø 1 ½" 15.0 - 124.0 139.0 95,000.00 13,205,000.00
- Pipa PVC Ø 1" - - - 35,000.00 -
-
2. PIPA HDPE (meter) -
- Pipa PE Ø 3" (SDR 17 - PN 10) - - -
- Pipa PE Ø 2" (SDR 17 - PN 10) - - -
- Pipa PE Ø 1 ½" (SDR 11 - PN 16) - - - -
-
3. ASSESORIS PIPA GIP -
- Socket GIP Ø 3" - - 103,000.00 -
- Socket GIP Ø 2" 4.0 - 4.0 43,000.00 172,000.00
- Socket GIP Ø 1 ½" 2.0 2.0 37,000.00 74,000.00
- Socket GIP Ø 1" - - -
- Bend 45⁰ GIP Ø 2" - - - -
- Bend 45⁰ GIP Ø 1 ½" - - - -
- Knee 90⁰ GIP Ø 3" - - - 156,000.00 -
- Knee 90⁰ GIP Ø 2" 6.0 - 6.0 56,000.00 336,000.00
- Knee 90⁰ GIP Ø 1 1/2" 1.0 2.0 3.0 40,000.00 120,000.00
- Knee 45⁰ GIP Ø 1 1/2" 2.0 2.0 56,000.00 112,000.00
- Bend 90⁰ GIP Ø 1" - - - -
- Gate Valve GIP Ø 3'' - 1,335,000.00 -
- Gate Valve GIP Ø 2'' - 3.0 - 3.0 493,000.00 1,479,000.00
- Gate Valve GIP Ø 1 ½'' 1.0 1.0 300,000.00 300,000.00
- Gate Valve GIP Ø 1'' - - -
- Check Valve GIP Ø 1 ½'' 1.0 1.0 350,000.00 350,000.00
- Double Nepple GIP Ø 3'' - 112,000.00 -
- Double Nepple GIP Ø 2'' - - 50,000.00 -
- Double Nepple GIP Ø 1 ½'' - - 37,000.00 -
- Double Nepple GIP Ø 1'' - - -
- Watermur/Union GIP Ø 2'' - - 200,000.00 -
- Watermur/Union GIP Ø 1 1/2'' 1.0 1.0 81,000.00 81,000.00
- Presure meter 1 1/2" 1.0 1.0 150,000.00 150,000.00
- Seal Tape 10.0 - 10.0 5,000.00 50,000.00
-
3. ASSESORIS PIPA PVC -
- Socked PVC Ø 3" - - -
- Sock Drat Luar PVC Ø 3" - - 85,000.00 -
- Sock Drat Luar PVC Ø 2" - - 2.0 - 2.0 38,000.00 76,000.00
- Sock Drat Luar PVC Ø1 1/2" 2.0 - 1.0 - 3.0 15,000.00 45,000.00
- Sock Drat Dalam PVC Ø 3" - - - 85,000.00 -
- Sock Drat Dalam PVC Ø 2" - - 38,000.00 -
- Reducer PVC Ø 3" x Ø 2" - - 40,000.00 -
- Reducer PVC Ø 3" x Ø 1 1/2" - 35,000.00 -
- Reducer PVC Ø 2" x Ø 1 1/2" 2.0 2.0 30,000.00 60,000.00
- Tee PVC Ø 3" x 3" x 3" - - 100,000.00 -
- Tee PVC Ø 2" x 2" x 2" 2.0 2.0 50,000.00 100,000.00
- Tee PVC Ø 2" x 3" x 2" - - - 140,000.00 -
- Tee PVC Ø 2" x 1.5" x 2" - - 70,000.00 -
- Gate Valve PVC Ø 3'' - - 300,000.00 -
- Gate Valve PVC Ø 2'' - - - 85,000.00 -
- Gate Valve PVC Ø 1 1/2'' - - - 55,000.00 -
- Dop PVC Ø 3" - 80,000.00 -
- Dop PVC Ø 2" 2.0 2.0 60,000.00 120,000.00
- Dop PVC Ø 1 1/2" 1.0 1.0 12,000.00 12,000.00
- Dop PVC Ø 1" - - 8,000.00 -
- Knee 90 PVC Ø 3" - - - 104,000.00 -
- Knee 90 PVC Ø 2" 2.0 2.0 32,000.00 64,000.00
- Knee 90 PVC Ø 1 1/2" - 2.0 2.0 17,500.00 35,000.00
- Lem Pipa (Solvent Cement PVC) @ 500 - 8.0 5.0 - 13.0 45,000.00 585,000.00
- Meteran Air - - 150,000.00 -

3. ASSESORIS PIPA HDPE


- Coupler Ø 1 ½" - - -
- Male Thread Join Equal Ø 1 ½" - - -
RENCANA ANGGARAN BIAYA
Provinsi/Kabupaten-Kota/Kecamatan/Desa : Sulawesi Selatan/Wajo/Pitumpanua/Alelebbae
Nomor RAB : 09 Sub pekerjaan/Kegiatan : TOWER RANGKA BESI SIKU
Pekerjaan Kegiatan : Sarana Air Minum Ukuran/Dimensi : 1,5 x 2 x 4 m

Volume Harga Biaya (Rp)


URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN APBDES Total APBN APBDES
inCash inKind Rp inCash inKind
1 2=3+4+5 3 4 5 6 7 8 9=2x8 10=3x8 11=4x8 12=5x8 13=6x8
1 BAHAN
A. PEKERJAAN PENDAHULUAN
1.1 Pek. Pemasangan Bowplank 2.00
- Balok Kayu klas III uk. 5/7 0.024 - 0.024 - m³ 2,800,000 67,200 - - 67,200 -
- Paku biasa 2" - 5" 0.040 - 0.040 - Kg 22,000 880 - - 880 -
- Papan Kayu Kls.III 3/20 0.014 - 0.014 - m³ 45,000 630 - - 630 -
B. PEKERJAAN TANAH
2.1 Pek. Urugan Pasir dibawah Pondasi 0.144
- Pasir urug 0.173 0.173 - m³ 242,000 41,818 - - 41,818 -
C. PEKERJAAN PONDASI BATU GUNUNG
3.1 Pas. Batu Kosong (anstamping) 0.288
- Batu belah 15/20 cm 0.346 - 0.346 - m³ 395,000 136,512 - - 136,512 -
- Pasir urug 0.124 - 0.124 - m³ 242,000 30,109 - - 30,109 -
3.2 Pas. Pondasi Batu Belah (1 : 3) 0.448
- Batu belah 10/15 cm 0.538 - 0.538 - M³ 395,000 212,352 - - 212,352 -
- Semen Portland 90.525 - 90.525 - Kg 1,340 121,303 - - 121,303 -
- Pasir pasang 0.217 - 0.217 - M³ 242,000 52,582 - - 52,582 -
D. PEKERJAAN TOWER
4.1 Pek. Tower Rangka Besi Siku 0.6 x 0.6 1.000
- Pembuatan dan Pemasangan (Besi Siku 0.6 x 0.6) 1.000 1.000 - Ls 11,500,000 11,500,000 - - 11,500,000 -
4.2 Bak Penampungan Tangki Fiber Glass 3 m3 1.000
- Pemasangan Tangki Fiber Glass 3 m3 1.000 1.000 - Ls 5,000,000 5,000,000 - - 5,000,000 -

Sub Total 1) 17,163,385 - - 17,163,385 -


2 UPAH
A. PEKERJAAN PENDAHULUAN
1.1 Membersihkan Lapangan dan Peralatan 4.02
- Pekerja 0.402 - 0.402 - Hok 100,000 40,205 - - 40,205 -
1.2 Pemasangan Bowplank 2.000
- Pekerja 0.200 - 0.200 - Hok 100,000 20,000 - - 20,000 -
- Tukang 0.200 - 0.200 - Hok 120,000 24,000 - - 24,000 -
B. PEKERJAAN TANAH
2.1 Pek. Galian Pondasi 1.296
- Pekerja 0.972 - 0.972 - Hok 100,000 97,200 - - 97,200 -
2.2 Pek. Urugan Pasir dibawah Pondasi 0.144
- Pekerja 0.043 - 0.043 - Hok 100,000 4,320 - - 4,320 -
2.3 Urugan Kembali 0.432
- Pekerja 0.108 - 0.108 - Hok 100,000 10,800 - - 10,800 -
C. PEKERJAAN PONDASI BATU GUNUNG
3.1 Pas. Batu Kosong (anstamping) 0.288
- Pekerja 0.225 - 0.225 - Hok 100,000 22,464 - - 22,464 -
- Tukang 0.112 - 0.112 - Hok 120,000 13,478 - - 13,478 -
3.2 Pas. Pondasi Batu Belah (1 : 3) 0.448
- Pekerja 0.672 - 0.672 - Hok 100,000 67,200 - - 67,200 -
- Tukang 0.336 - 0.336 - Hok 120,000 40,333 - - 40,333 -
Sub Total 2) 340,000 - - 340,000 -
Jumlah Total) 17,503,385 - - 17,503,385 -
Palippu, Juni 2020
Disetujui Oleh : Didampingi oleh : Dibuat Oleh :
Ketua DPMU Kabupaten Wajo KKM "PUNCAK" Fasilitator Masyarakat Pelaksana Pamsimas

( MUH. TAUFIQ, ST ) ( ABDUL HAMID ) ( ANDI ADRI ANSYA, ST ) ( MUH. YAHYA)


NIP : 19750717 2009 02 1003 Koordinator FM - WSS Ketua SATLAK
RENCANA ANGGARAN BIAYA
Provinsi/Kabupaten-Kota/Kecamatan/Desa : Sulawesi Selatan/Wajo/Pitumpanua/Alelebbae
Nomor RAB : 10 Sub pekerjaan/Kegiatan : Listrik PLN
Pekerjaan Kegiatan : Sarana Air Minum Ukuran/Dimensi : 1300 VA

Volume Harga Biaya (Rp)


URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN APBDES Total APBN APBDES
inCash inKind (Rp) inCash inKind
1 2=3+4+5 3 4 5 6 7 8 9=2x8 10=3x8 11=4x8 12=5x8 13=6x8
1. BAHAN
- INSTALASI JARINGAN LISTRIK PLN
1.1 Biaya Penyambungan (BP) 1 - - 1 - Ls 2,012,500 2,012,500 - - 2,012,500 -
1.2 Biaya Surat Jaminan Instalasi (SJI) 1 - - 1 - Ls 750,000 750,000 - - 750,000 -
1.3 Biaya Gambar 1 - - 1 - Ls 324,000 324,000 - - 324,000 -
1.4 Sertifikat Layak Operasi (SLO) 1 - - 1 - Ls 100,000 100,000 - - 100,000 -
1.5 Cable 2x16 mm 100 100.00 - m' 8,000 800,000 800,000 -
Sub Total 1) 3,986,500 - - 3,986,500 -
2. UPAH
- Pemasangan Instalasi 1 - - 1 - Ls 250,000 250,000 - - 250,000 -

Sub Total 2 250,000 - - 250,000 -


Jumlah Total) 4,236,500 - - 4,236,500 -

-
Disetujui Oleh : Didampingi oleh : Dibuat Oleh :
Ketua DPMU Kabupaten Wajo KKM "ALELEBBAE" Fasilitator Masyarakat Pelaksana Pamsimas

( MUH. TAUFIQ, ST ) ( ABDUL HAMID ) ( ANDI ADRI ANSYA, ST ) 0


NIP : 19750717 2009 02 1003 Koordinator FM - WSS Ketua SATLAK
RENCANA ANGGARAN BIAYA
Provinsi/Kabupaten-Kota/Kecamatan/Desa : Sulawesi Selatan/Wajo/Pitumpanua/Alelebbae
Nomor RAB : 11 Sub pekerjaan/Kegiatan : Pompa Submersible
Pekerjaan Kegiatan : Pembangunan SAB Ukuran/dimensi : 1 Paket

Volume Harga Biaya (Rp)


URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN APBDES Total APBN APBDES
inCash inKind Rp inCash inKind
1 2=3+4+5 3 4 5 6 7 8 9=2x8 10=3x8 11=4x8 12=5x8 13=6x8
I. BAHAN
- Pompa
1.1 Submersible Pump 1.00 - - 1.00 - Set 4,500,000 4,500,000 - - 4,500,000 -
- Kapasitas 0,75 Ltr/s
- Head 80 m
- Diameter pipa Outlet 1"-1 1/2"
- Daya 1100 watt
1.2 Cable Power 70.00 - - 70.00 - M' 3,000 210,000 - - 210,000 -
1.3 Cable Otomatis Pompa 250.00 - - 250.00 - M' 3,000 750,000 - - 750,000 -
1.4 Otomatis Pompa 1.00 - - 1.00 - Bh 150,000 150,000 - - 150,000 -
Sub Total 1) 5,610,000 - - 5,610,000 -
2. UPAH
- Biaya Pemasangan Pompa & Aksesoris 1.00 - - 1.00 - Ls 2,000,000 2,000,000 - - 2,000,000 -
Sub Total 2) 2,000,000 - - 2,000,000 -
Jumlah Total 7,610,000 - - 7,610,000 -

Disetujui Oleh : Didampingi oleh : Dibuat Oleh :


Ketua DPMU Kabupaten Wajo KKM "ALELEBBAE" Fasilitator Masyarakat Pelaksana Pamsimas

( MUH. TAUFIQ, ST ) ( ABDUL HAMID ) ( ANDI ADRI ANSYA, ST ) 0


NIP : 19750717 2009 02 1003 Koordinator FM-WSS Ketua SATLAK
RENCANA ANGGARAN BIAYA

Nomor RAB : 06 Sub pekerjaan/Kegiatan : Listrik PLN


Pekerjaan Kegiatan : Sarana Air Minum Ukuran/Dimensi : 3500 VA

Volume Harga Biaya (Rp)


URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN Total APBN
inCash inKind (Rp) inCash inKind
1 2=3+4+5 3 4 5 6 7 8=2x7 9=3*7 10=4x7 12=5x7
1. BAHAN
- INSTALASI JARINGAN LISTRIK PLN
1.1 Biaya Penyambungan (BP) 1 - - 1 Ls 2,712,000 2,712,000 - - 2,712,000
1.2 Biaya Surat Jaminan Instalasi (SJI) 1 - - 1 Ls 1,750,000 1,750,000 - - 1,750,000
1.3 Biaya Gambar 1 - - 1 Ls 724,000 724,000 - - 724,000
1.4 Sertifikat Layak Operasi (SLO) 1 - - 1 Ls 100,000 100,000 - - 100,000
1.5 Cable 2x16 mm 80 80.00 m' 7,500 600,000 600,000
Sub Total 1) 5,886,000 - - 5,886,000
2. UPAH
- Pemasangan Instalasi 1 - - 1 Ls 250,000 250,000 - - 250,000

Sub Total 2 250,000 - - 250,000


Jumlah Total) 6,136,000 - - 6,136,000
Dibuatkan 6,136,000 - - 6,136,000

Palippu, Juni 2020


Disetujui Oleh : Dibuat Oleh :
Ketua DPMU Kabupaten Wajo KKM "PUNCAK" Fasilitator Masyarakat Pelaksana Pamsimas

( MUH. TAUFIQ, ST ) ( ABDUL HAMID ) (GULBUDIN HEMATIAR, ST ) ( MUH. YAHYA)


NIP : 19750717 2009 02 1003 Koordinator FM - WSS Ketua SATLAK
RENCANA ANGGARAN BIAYA

Nomor RAB : 07 Sub pekerjaan/Kegiatan : Pengadaan Pompa Submersible


Pekerjaan Kegiatan : Pembangunan SAB Ukuran/dimensi : 1 Paket

Volume Harga Biaya (Rp)


URAIAN Kontribusi Masy. Satuan Satuan Kontribusi Masy.
Total APBN Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5 3 4 5 6 7 8=2x7 9=3x7 10=4x7 11=5x7
I. BAHAN
- Pompa (Reservoir)
1.1 Submersible Pump (SP) 1.00 - - 1.00 Set 21,000,000 21,000,000 - - 21,000,000
- Kapasitas 0,75 - 1,2 Ltr/s
- Head 70 m
- Diameter pipa Outlet 11/2"
- Daya 2200 watt
1.2 Control Panel 1.00 1.00 Bh 6,000,000 6,000,000 - - 6,000,000
1.3 Stabilizer 5 KVA, 1 Phase 1.00 - - 1.00 Unit 6,500,000 6,500,000 - - 6,500,000
1.4 Drop Cable Power 1.00 - - 1.00 Rol 2,000,000 2,000,000 - - 2,000,000
1.5 Drop Cable Water level Control 1.00 - - 1.00 Rol 1,500,000 1,500,000 - - 1,500,000
Sub Total 1) 37,000,000 - - 37,000,000
2. UPAH
- Mobilisasi dan Demobilisasi Alat 1.00 - - 1.00 Ls 2,000,000 2,000,000 - - 2,000,000
- Biaya Pemasangan Pompa 1.00 - - 1.00 Ls 5,000,000 5,000,000 - - 5,000,000
- Biaya Running Test & Training Operator 1.00 - - 1.00 Ls 1,000,000 1,000,000 - - 1,000,000
Sub Total 2) 8,000,000 - - 8,000,000
Jumlah Total 45,000,000 - - 45,000,000

Palippu, Juni 2020

Disetujui Oleh : Dibuat Oleh :


Ketua DPMU Kabupaten Wajo KKM "PUNCAK" Fasilitator Masyarakat Pelaksana Pamsimas

MUH. TAUFIQ, ST ( ABDUL HAMID ) (GULBUDIN HEMATIAR, ST ) ( MUH. YAHYA)


Nip. 19750717 2009 02 1003 Koordinator FM - WSS Ketua SATLAK
RENCANA ANGGARAN BIAYA
Provinsi/Kabupaten-Kota/Kecamatan/Desa : Sulawesi Selatan/Wajo/Pitumpanua/Alelebbae
Nomor RAB : 08 Sub pekerjaan/Kegiatan : Pengadaan Alat Bantu Teknis SAM
Pekerjaan Kegiatan : Sarana Air Minum dan Sanitasi Sekolah
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN APBN APBN
inCash inKind Rp inCash inKind
1 2=3+4+5 3 4 5 7 8 9=2x8 10=3x8 11=4x8 12=5x8
ALAT BANTU TEKNIS
1 Gerobak Dorong - - - - Bh 470,000 - - - -
2 Sekop - - - - Bh 50,000 - - - -
3 Gergaji Besi - - - - Bh 50,000 - - - -
4 Mata Gergaji - - - - Bh 10,000 - - - -
5 Sney Pipa Ø 1/2" - 2 1/2" - - - - Unit 1,300,000 - - - -
6 Kunci Pipa Gip . 1/2" - 3" - - - - Unit 305,000 - - - -
7 Ember Cor - - - - Bh 10,000 - - - -
8 Kuas Cat Besar - - - - Bh 12,000 - - - -
9 Kuas Cat Kecil - - - - Bh 4,000 - - - -
10 Terpal/Tenda Kerja - - - - Bh 250,000 - - - -
Jumlah Total - - - -

Alelebbae, Desember 2019

Disetujui Oleh : Didampingi oleh : Dibuat Oleh :


Ketua DPMU Kabupaten Wajo KKM "ALELEBBAE" Fasilitator Masyarakat Pelaksana Pamsimas

( MUH. TAUFIQ, ST ) ( ABDUL HAMID ) (GULBUDIN HEMATIAR, ST ) (SAHARUDDIN)


NIP : 19750717 2009 02 1003 Koordinator FM - WSS Ketua SATLAK
RENCANA ANGGARAN BIAYA
Provinsi/Kabupaten-Kota/Kecamatan/Desa : Sulawesi Selatan/Wajo/Pitumpanua/Alelebbae
Nomor RAB : 13 Sub pekerjaan/Kegiatan : SCT
Pekerjaan Kegiatan : Sarana Air Minum Ukuran/Dimensi : 0.55 x 0.7 x 0.8 m

Volume Harga Biaya (Rp)


URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN APBDES Total APBN APBDES
inCash inKind Rp inCash inKind
1 2=3+4+5 3 4 5 5 6 7 8=2x7 9=3x7 10=4x7 11=5x7 11=5x7
1. BAHAN
A. PEKERJAAN PENDAHULUAN
1.1 Pemasangan Bowplank 1.65
- Balok Kayu klas III uk. 5/7 0.020 - 0.020 - M³ 2,800,000 55,429 - - 55,429 -
- Paku biasa 5" - 7" 0.033 0.033 - Kg 22,000 726 - - 726 -
- Kayu papan kls. III 3/20 0.012 - 0.012 - M³ 45,000 520 - - 520 -
B. PEKERJAAN TANAH
2.1 Urugan Pasir 0.034
- Pasir urug 0.041 - 0.041 - M³ 242,000 9,874 - - 9,874 -
C. PEKERJAAN DINDING
3.1 Pasang Batu Bata 1:4 2.640
- Batu Bata merah 5 x 11 x 22 cm 184.800 184.800 - M³ 1,000 184,800 - - 184,800 -
- Semen Portland 30.360 30.360 - Kg 1,340 40,682 - - 40,682 -
- Pasir pasang 0.114 0.114 - M³ 242,000 27,472 - - 27,472 -
D. PEKERJAAN FINISHING
4.1 Plesteran 1:2 5.280
- Semen Portland 75.398 75.398 - Kg 1,340 101,034 - - 101,034 -
- Pasir pasang 0.121 0.121 - M³ 242,000 29,388 - - 29,388 -
4.2 Pengecatan 5.280
- Cat dasar 1 kali 0.634 0.634 - Kg 105,000 66,528 - - 66,528 -
- Cat penutup 2 kali 0.950 0.950 - Kg 105,000 99,792 - - 99,792 -
4.3 Pas. Floor drain -
- Floor drain - - - Bh 35,000 - - - - -
E. PEMASANGAN WESTAFEL TUNGGAL -
- Westafel Tunggal lengkap dengan kran air dan acc 1.000 1.000 - Ls 200,000 200,000 - - 200,000 -

Sub Total 1) 816,245 - - 816,245 -


Dibulatkan 816,200 - - 816,200 -
2. UPAH
A. PEKERJAAN PENDAHULUAN
1.1 Membersihkan Lapangan dan Perataan 2.88
- Pekerja 0.288 - 0.288 - Hok 100,000 28,805 - - 28,805 -
1.2 Pemasangan Bowplank 1.650
- Pekerja 0.165 - 0.165 - Hok 100,000 16,497 - - 16,497 -
- Tukang 0.165 0.165 - Hok 120,000 19,796 - - 19,796 -
B. PEKERJAAN TANAH
2.1 Galian Tanah 0.630
- Pekerja 0.394 - 0.394 - Hok 100,000 39,375 - - 39,375 -
2.2 Urugan Pasir 0.034
- Pekerja 0.010 - 0.010 - Hok 100,000 1,020 - - 1,020 -
C. PEKERJAAN DINDING
3.1 Pasang Batu Bata 1:4 2.640
- Pekerja 0.845 - 0.845 - Hok 100,000 84,480 - - 84,480 -
- Tukang 0.264 0.264 - Hok 120,000 31,680 - - 31,680 -
D. PEKERJAAN FINISHING
4.1 Plesteran 1:2 5.280
- Pekerja 1.320 - 1.320 - Hok 100,000 132,000 - - 132,000 -
- Tukang 1.056 - 1.056 - Hok 120,000 126,720 - - 126,720 -
4.2 Pengecetan 5.280
- Pekerja 0.148 - 0.148 - Hok 100,000 14,784 - - 14,784 -
- Tukang 0.222 - 0.222 - Hok 120,000 26,611 - - 26,611 -
4.3 Pas. Floor drain -
- Pekerja - - - - Hok 100,000 - - - - -
- Tukang - - - - Hok 120,000 - - - - -
E. PEMASANGAN WESTAFEL TUNGGAL
5.1 Westafel Tunggal lengkap dengan kran air dan acc 1.000
- Pekerja 0.054 - 0.054 - Hok 100,000 5,400 - - 5,400 -
- Tukang 0.090 - 0.090 - Hok 120,000 10,800 - - 10,800 -
Sub Total 2) 537,968 - - 537,968 -
Dibulatkan 537,900 - - 537,900 -
Jumlah Total) 1,354,100 - - 1,354,100 -

Disetujui Oleh : Didampingi oleh : Dibuat Oleh :


Ketua DPMU Kabupaten Wajo KKM "PUNCAK" 0 Pelaksana Pamsimas

( MUH. TAUFIQ, ST ) ( ABDUL HAMID ) 0 0


NIP : 19750717 2009 02 1003 Koordinator 0 0
RENCANA ANGGARAN BIAYA
Provinsi/Kabupaten-Kota/Kecamatan/Desa : Sulawesi Selatan/Wajo/Pitumpanua/Alelebbae
Nomor RAB : 14 Sub pekerjaan/Kegiatan : TEMPAT SAMPAH
Pekerjaan Kegiatan : Sarana Air Minum Ukuran/Dimensi : 1.5 x 1.5 x 1

Volume Harga Biaya (Rp)


URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN APBDES Total APBN APBDES
inCash inKind Rp inCash inKind
1 2=3+4+5 3 4 5 5 6 7 8=2x7 9=3x7 10=4x7 11=5x7 11=5x7
1. BAHAN
A. PEKERJAAN TANAH
1.1 Urugan Pasir 0.111
- Pasir urug 0.133 - 0.133 - M³ 242,000 32,258 - - 32,258 -
B. PEKERJAAN DINDING
2.1 Pasang Batu Bata 1:4 4.168
- Batu Bata merah 5 x 11 x 22 cm 291.760 291.760 - Bh 1,000 291,760 - - 291,760 -
- Semen Portland 47.932 47.932 - Kg 1,340 64,229 - - 64,229 -
- Pasir pasang 0.179 0.179 - M³ 242,000 43,372 - - 43,372 -
C. PEKERJAAN FINISHING
3.1 Plesteran 1:2 8.336
- Semen Portland 119.038 119.038 - Kg 1,340 159,511 - - 159,511 -
- Pasir pasang 0.192 0.192 - M³ 242,000 46,398 - - 46,398 -
3.2 Pengecatan 8.336
- Cat dasar 1 kali 1.000 1.000 - Kg 105,000 105,034 - - 105,034 -
- Cat penutup 2 kali 1.500 1.500 - Kg 105,000 157,550 - - 157,550 -
3.3 Pas. Pintu Kayu 1.000
- Pintu Kayu Kls II 1.000 1.000 - Bh 100,000 100,000 - - 100,000 -

Sub Total 1) 1,000,112 - - 1,000,112 -


Dibulatkan 1,000,100 - - 1,000,100 -
2. UPAH
A. PEKERJAAN PENDAHULUAN
1.1 Membersihkan Lapangan dan Perataan 2.24
- Pekerja 0.224 - 0.224 - Hok 100,000 22,402 - - 22,402 -
B. PEKERJAAN TANAH
2.1 Galian Tanah 0.630
- Pekerja 0.394 - 0.394 - Hok 100,000 39,375 - - 39,375 -
2.2 Urugan Pasir 0.111
- Pekerja 0.033 - 0.033 - Hok 100,000 3,332 - - 3,332 -
B. PEKERJAAN DINDING
2.1 Pasang Batu Bata 1:4 4.168
- Pekerja 1.334 - 1.334 - Hok 100,000 133,376 - - 133,376 -
- Tukang 0.417 0.417 - Hok 120,000 50,016 - - 50,016 -
D. PEKERJAAN FINISHING
4.1 Plesteran 1:2 8.336
- Pekerja 2.084 - 2.084 - Hok 100,000 208,400 - - 208,400 -
- Tukang 1.667 - 1.667 - Hok 120,000 200,064 - - 200,064 -
4.2 Pengecetan 8.336
- Pekerja 0.233 - 0.233 - Hok 100,000 23,341 - - 23,341 -
- Tukang 0.350 - 0.350 - Hok 120,000 42,013 - - 42,013 -
4.3 Pas. Pintu Kayu 1.000
- Pekerja 0.010 - 0.010 - Hok 100,000 1,000 - - 1,000 -
- Tukang 0.100 - 0.100 - Hok 120,000 12,000 - - 12,000 -
Sub Total 2) 735,320 - - 735,320 -
Dibulatkan 735,300 - - 735,300 -
Jumlah Total) 1,735,400 - - 1,735,400 -

Disetujui Oleh : Didampingi oleh : Dibuat Oleh :


Ketua DPMU Kabupaten Wajo KKM "PUNCAK" 0 Pelaksana Pamsimas

( MUH. TAUFIQ, ST ) ( ABDUL HAMID ) (GULBUDIN HEMATIAR, ST ) 0


NIP : 19750717 2009 02 1003 Koordinator FM - WSS 0
RENCANA ANGGARAN BIAYA
Provinsi/Kabupaten-Kota/Kecamatan/Desa : Sulawesi Selatan/Wajo/Pitumpanua/Alelebbae
Nomor RAB : 07 Sub pekerjaan/Kegiatan : Kran Umum (1 Kran)
Pekerjaan Kegiatan : Sarana Air Minum Ukuran/Dimensi : 1,4 x 1,4 m

Volume Harga Biaya (Rp)


URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5 3 4 5 6 7 8=2x7 9=3x7 10=4x7 11=5x7
1. BAHAN
A. PEKERJAAN TANAH
2.1 Urugan Pasir
- Pasir urug 0.118 0.118 M³ 242,000 28,459 - - 28,459
C. PEKERJAAN PONDASI DAN DRAINASE
3.1 Pasang Pondasi Bata Merah 1 : 3
- Batu Bata merah 5 x 11 x 22 cm 137.200 137.200 Bh 1,000 137,200 - - 137,200
- Semen Portland 37.142 37.142 Kg 1,340 49,770 - - 49,770
- Pasir pasang 0.074 0.074 M³ 242,000 18,024 - - 18,024
3.2 Pasang Bata Merah Drainase 1 : 3
- Batu Bata merah 5 x 11 x 22 cm 156.800 156.800 Bh 1,000 156,800 - - 156,800
- Semen Portland 42.448 42.448 Kg 1,340 56,880 - - 56,880
- Pasir pasang 0.085 0.085 M³ 242,000 20,599 - - 20,599
E. PEKERJAAN LANTAI RABAT
5.1 Lantai Beton
- Semen Portland 23.000 23.000 Kg 1,340 30,820 - - 30,820
- Pasir beton 0.064 0.064 M³ 306,000 19,518 - - 19,518
- Batu pecah 2/3/4 cm 0.076 0.076 M³ 591,000 44,960 - - 44,960
F. PEKERJAAN FINISHING
6.1 Plesteran 1:2
- Semen Portland 64.888 64.888 Kg 1,340 86,950 - - 86,950
- Pasir pasang 0.129 0.129 M³ 242,000 31,102 - - 31,102
6.3 Pengecatan
- Plamir tembok 0.317 0.317 Kg 9,000 2,856 - - 2,856
- Cat dasar 0.317 0.317 Kg 105,000 33,320 - - 33,320
- Cat tembok 0.825 0.825 Kg 105,000 86,632 - - 86,632
G. PEKERJAAN BOX VALVE
7.1 Pasir Urug
- Pasir urug 0.017 0.017 m³ 242,000 3,993 - - 3,993
7.2 Pas. Batu 1/2 Bata 1:3
- Bata merah 5 x 11 x 22 cm 66.850 66.850 Bh 1,000 66,850 - - 66,850
- Semen Portland 18.097 18.097 Kg 1,340 24,250 - - 24,250
- Pasir pasang 0.036 0.036 m³ 242,000 8,782 - - 8,782
7.3 Pek. Plesteran 1:2
- Semen Portland 26.037 26.037 Kg 1,340 34,890 - - 34,890
- Pasir pasang 0.052 0.052 m³ 242,000 12,480 - - 12,480
7.4 Penutup Box Valve 60 x 60
- Penutup Man Hole Besi Plat 60 x 60 1.000 1.000 Ls 200,000 200,000 - - 200,000
H. PEKERJAAN PIPA
- Pipa GIP Ø 3/4" 6.000 6.000 M' 227,000 227,000 - - 227,000
- Pipa PVC Ø 3/4" 12.000 12.000 M' 17,500 52,500 - - 52,500
- Socked GIP 3/4" 2.000 2.000 Bh 11,000 22,000 - - 22,000
- Clamp Sadle Ø 1 1/2" x 3/4" 1.000 1.000 Bh 34,000 34,000 - - 34,000
- Socked Drat Luar PVC Ø 3/4" 2.000 2.000 Bh 6,000 12,000 - - 12,000
- Socked Drat dalam PVC Ø 3/4" 2.000 2.000 Bh 6,000 12,000 - - 12,000
- Sambungan Knee GIP Ø 3/4" 2.000 2.000 Bh 0 - - - -
- Sambungan Knee PVC Ø 3/4" 2.000 2.000 Bh 2,500 5,000 - - 5,000
- Sambungan Tee GIP Ø 3/4" 1.000 1.000 Bh 4,500 4,500 - - 4,500
- Kran Air Ø 3/4" 2.000 2.000 Bh 20,000 40,000 - - 40,000
- Stop Kran PVC Ø 3/4" 1.000 1.000 Bh 35,000 35,000 - - 35,000
Sub Total 1) 1,599,137 - - 1,599,137
Dibulatkan 1,599,100 - - 1,599,100
2. UPAH
A. PEKERJAAN TANAH
2.1 Galian Tanah
- Pekerja 0.400 - 0.400 Hok 100,000 40,000 - - 40,000
2.2 Urugan Pasir
- Pekerja 0.049 - 0.049 Hok 100,000 4,900 - - 4,900
C. PEKERJAAN PONDASI DAN DRAINASE
3.1 Pasang Pondasi Bata Merah 1 : 3
- Pekerja 0.588 - 0.588 Hok 100,000 58,800 - - 58,800
- Tukang 0.196 - 0.196 Hok 120,000 23,520 - - 23,520
3.2 Pasang Bata Merah Drainase 1 : 3
- Pekerja 0.672 0.672 - Hok 100,000 67,200 - 67,200 -
- Tukang 0.224 - 0.224 Hok 120,000 26,880 - - 26,880
E. PEKERJAAN LANTAI RABAT
5.1 Lantai Beton
- Pekerja 0.165 - 0.165 Hok 100,000 16,500 - - 16,500
- Tukang 0.028 - 0.028 Hok 120,000 3,300 - - 3,300
F. PEKERJAAN FINISHING
6.1 Plesteran 1:2
- Pekerja 1.904 1.904 - Hok 100,000 190,400 - 190,400 -
- Tukang 0.129 0.129 - Hok 120,000 15,422 - 15,422 -
6.3 Pengecetan
- Pekerja 0.063 - 0.063 Hok 100,000 6,347 - - 6,347
- Tukang 0.825 - 0.825 Hok 120,000 99,008 - - 99,008
G. PEKERJAAN BOX VALVE
7.1 Pasir Urug
- Pekerja 0.007 - 0.007 Hok 100,000 688 - - 688
7.2 Pas. Batu 1/2 Bata 1:3
- Pekerja 0.287 - 0.287 Hok 100,000 28,650 - - 28,650
- Tukang 0.096 - 0.096 Hok 120,000 11,460 - - 11,460
7.3 Pek. Plesteran 1:2
- Pekerja 0.764 0.764 - Hok 100,000 76,400 - 76,400 -
- Tukang 0.052 0.052 - Hok 120,000 6,188 - 6,188 -
H. PEKERJAAN PIPA
8.1 Pipa GIP Ø 3/4"
- Pekerja 2.070 - 2.070 Hok 100,000 207,000 - - 207,000
8.2 Pipa PVC Ø 3/4"
- Pekerja 4.140 - 4.140 Hok 100,000 414,000 - - 414,000
Sub Total 2) 1,296,663 - 355,611 941,052
Dibuatkan 1,296,700 - 355,600 941,000
Jumlah Total) 2,895,800 - 355,600 2,540,100

Disetujui Oleh : Dibuat Oleh :


Ketua DPMU Kabupaten Wajo KKM "PUNCAK" 0 Pelaksana Pamsimas

( MUH. TAUFIQ, ST ) ( ABDUL HAMID ) 0 0


NIP : 19750717 2009 02 1003 Koordinator 0 0
RENCANA ANGGARAN BIAYA
Provinsi/Kabupaten-Kota/Kecamatan/Desa : Sulawesi Selatan/Wajo/Pitumpanua/Alelebbae
Nomor RAB : 03 Sub pekerjaan/Kegiatan : PMA (Sumber I) & Rumah Pompa
Pekerjaan Kegiatan : Sarana Air Minum Ukuran/Dimensi : 3 x 10 x 3,3 m

Volume Harga Biaya (Rp)


URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5 3 4 5 6 7 8=2x7 9=3x7 10=4x7 11=5x7
1. BAHAN
A. PEKERJAAN PENDAHULUAN
1.1 Pemasangan Bowplank
- Balok Kayu klas III uk. 5/5 1.200 - 1.200 M³ 2,800,000 3,360,000 - - 3,360,000
- Paku biasa 5" - 7" 0.200 0.200 Kg 22,000 4,400 - - 4,400
- Kayu papan kls. III 3/20 0.070 - 0.070 M³ 45,000 3,150 - - 3,150
B. PEKERJAAN TANAH
2.1 Urugan Pasir di Bawah Aanstamping
- Pasir urug 0.752 - 0.752 M³ 242,000 181,936 - - 181,936
C. PEKERJAAN PONDASI BATU GUNUNG
3.1 Pasang Batu Kosong
- Batu belah 3.007 3.007 M³ 395,000 1,187,844 - - 1,187,844
- Pasir pasang 1.083 1.083 M³ 242,000 261,987 - - 261,987
3.2 Pasang Batu Gunung
- Batu belah 10/15 cm 11.170 11.170 M³ 395,000 4,411,992 - - 4,411,992
- Semen Portland 1,880.216 1,880.216 Kg 1,340 2,519,489 - - 2,519,489
- Pasir pasang 4.514 4.514 M³ 242,000 1,092,480 - - 1,092,480
D. PEKERJAAN BETON
4.1 Sloef 15x25
* Beton
- Semen portland 390.060 390.060 Kg 1,340 522,680 - - 522,680
- Pasir Beton 0.579 0.579 M³ 306,000 177,051 - - 177,051
- Batu pecah 2/3 cm 0.846 0.846 M³ 591,000 500,151 - - 500,151
* Pembesian
- Besi beton Polos Ø 12 166.320 166.320 Kg 15,860 2,637,770 - - 2,637,770
- Besi beton Polos Ø 8 56.700 56.700 Kg 15,823 897,152 - - 897,152
- Kawat beton 3.186 3.186 Kg 23,000 73,278 - - 73,278
* Bekisting -
- Kayu kelas III 0.266 0.266 - M³ 2,800,000 744,660 - 744,660 -
- Paku 5 - 10 cm 1.773 1.773 Kg 22,000 39,006 - - 39,006
4.1 Ring Balk 15x15
* Beton
- Semen portland 47.520 47.520 Kg 1,340 63,677 - - 63,677
- Pasir Beton 0.070 0.070 M³ 306,000 21,570 - - 21,570
- Batu pecah 2/3 cm 0.103 0.103 M³ 591,000 60,932 - - 60,932
* Pembesian
- Besi beton Polos Ø 12 23.940 23.940 Kg 15,860 379,679 - - 379,679
- Besi beton Polos Ø 8 7.560 7.560 Kg 15,823 119,620 - - 119,620
- Kawat beton 0.450 0.450 Kg 23,000 10,350 - - 10,350
* Bekisting -
- Kayu kelas III 0.270 0.270 - M³ 2,800,000 756,000 - 756,000 -
- Paku 5 - 10 cm 1.800 1.800 Kg 22,000 39,600 - - 39,600
4.2 Plat Beton
* Beton
- Semen portland 955.891 955.891 Kg 1,340 1,280,894 - - 1,280,894
- Pasir Beton 1.418 1.418 M³ 306,000 433,887 - - 433,887
- Batu pecah 2/3 cm 2.074 2.074 M³ 591,000 1,225,683 - - 1,225,683
* Pembesian
- Besi beton Polos Ø 10 65.520 65.520 Kg 15,802 1,035,365 - - 1,035,365
- Kawat beton 0.936 0.936 Kg 23,000 21,528 - - 21,528
* Bekisting -
- Paku 5 - 10 cm 4.526 4.526 Kg 22,000 99,572 - - 99,572
- Balok kayu kelas III 0.170 0.170 M³ 2,800,000 475,230 - 475,230 -
- Plywood tebal 9 mm 3.960 3.960 Lbr 110,000 435,628 - - 435,628
- Bambu 67.890 67.890 Btg #NAME? #NAME? #NAME? #NAME? #NAME?
4.3 Dinding Beton
* Beton
- Semen portland 223.027 223.027 Kg 1,340 298,856 - - 298,856
- Pasir Beton 0.331 0.331 M³ 306,000 101,234 - - 101,234
- Batu pecah 2/3 cm 0.484 0.484 M³ 591,000 285,975 - - 285,975
* Pembesian
- Besi beton Polos Ø 10 16.380 16.380 Kg 15,802 258,841 - - 258,841
- Kawat beton 0.234 0.234 Kg 23,000 5,382 - - 5,382
* Bekisting -
- Paku 5 - 10 cm 0.264 0.264 Kg 22,000 5,808 - - 5,808
- Balok kayu kelas III 0.013 0.013 M³ 2,800,000 36,960 - 36,960 -
- Plywood tebal 9 mm 0.231 0.231 Lbr 110,000 25,410 - - 25,410
- Bambu 1.980 1.980 Btg #NAME? #NAME? #NAME? #NAME? #NAME?
E. PEKERJAAN FINISHING
5.2 Plesteran 1:2
- Semen Portland 136.443 136.443 Kg 1,340 182,833 - - 182,833
- Pasir pasang 0.408 0.408 M³ 242,000 98,726 - - 98,726
5.5 Pengecatan
- Plamir tembok 0.528 0.528 Kg 9,000 4,752 - - 4,752
- Cat dasar 0.528 0.528 Kg 105,000 55,440 - - 55,440
- Cat tembok 1.373 1.373 Kg 105,000 144,144 - - 144,144
Sub Total 1) #NAME? #NAME? #NAME? #NAME?
Dibulatkan #NAME? #NAME? #NAME? #NAME?
2. UPAH
A. PEKERJAAN PENDAHULUAN
1.1 Membersihkan Lapangan dan Peralatan
- Pekerja 1.000 1.000 - Hok 100,000 100,000 - 100,000 -
1.2 Pemasangan Bowplank
- Pekerja 1.000 - 1.000 Hok 100,000 100,000 - - 100,000
- Tukang 1.000 1.000 Hok 120,000 120,000 - - 120,000
B. PEKERJAAN TANAH
2.1 Galian Tanah Tebing
- Pekerja 4.600 - 4.600 Hok 100,000 460,000 - - 460,000
2.2 Galian Tanah Keras
- Pekerja 34.375 - 34.375 Hok 100,000 3,437,500 - - 3,437,500
2.3 Urugan Pasir
- Pekerja 0.188 0.188 - Hok 100,000 18,795 - 18,795 -
2.4 Urugan Tanah Kembali
- Pekerja 3.237 - 3.237 Hok 100,000 323,692 - - 323,692
C. PEKERJAAN PONDASI BATU GUNUNG
3.1 Pas. Batu Kosong
- Pekerja 1.955 1.955 - Hok 100,000 195,468 - 195,468 -
- Tukang 0.977 0.977 - Hok 120,000 117,281 - 117,281 -
3.2 Pas. Batu Gunung
- Pekerja 13.962 13.962 - Hok 100,000 1,396,200 - 1,396,200 -
- Tukang 6.981 6.981 - Hok 120,000 837,720 - 837,720 -
D. PEKERJAAN BETON
4.1 Sloef 15x25
* Beton
- Pekerja 1.828 - 1.828 Hok 100,000 182,841 - - 182,841
- Tukang 0.305 0.305 Hok 120,000 36,568 - - 36,568
* Pembesian
- Pekerja 1.487 - 1.487 Hok 100,000 148,680 - - 148,680
- Tukang 1.487 1.487 Hok 120,000 178,416 - - 178,416
* Bakesting
- Pekerja 3.073 3.073 - Hok 100,000 307,320 - 307,320 -
- Tukang 1.537 1.537 Hok 120,000 184,392 - - 184,392
4.1 Ring Balk 15x15
* Beton
- Pekerja 0.223 - 0.223 Hok 100,000 22,275 - - 22,275
- Tukang 0.037 0.037 Hok 120,000 4,455 - - 4,455
* Pembesian
- Pekerja 0.210 - 0.210 Hok 100,000 21,000 - - 21,000
- Tukang 0.210 0.210 Hok 120,000 25,200 - - 25,200
* Bakesting
- Pekerja 3.120 3.120 - Hok 100,000 312,000 - 312,000 -
- Tukang 1.560 1.560 Hok 120,000 187,200 - - 187,200
4.2 Plat Beton
* Beton
- Pekerja 4.481 - 4.481 Hok 100,000 448,074 - - 448,074
- Tukang 0.747 0.747 Hok 120,000 89,615 - - 89,615
* Pembesian
- Pekerja 0.437 - 0.437 Hok 100,000 43,680 - - 43,680
- Tukang 0.437 0.437 Hok 120,000 52,416 - 52,416 -
* Bakesting
- Pekerja 7.468 7.468 - Hok 100,000 746,790 - 746,790 -
- Tukang 3.734 3.734 Hok 120,000 448,074 - 448,074 -
4.3 Dinding Beton
* Beton
- Pekerja 1.045 - 1.045 Hok 100,000 104,544 - - 104,544
- Tukang 0.174 0.174 Hok 120,000 20,909 - - 20,909
* Pembesian
- Pekerja 0.109 - 0.109 Hok 100,000 10,920 - - 10,920
- Tukang 0.109 0.109 Hok 120,000 13,104 - - 13,104
* Bakesting
- Pekerja 0.436 0.436 - Hok 100,000 43,560 - 43,560 -
- Tukang 0.218 0.218 Hok 120,000 26,136 - - 26,136
G. PEKERJAAN FINISHING
7.1 Plesteran 1:2
- Pekerja 3.422 - 3.422 Hok 100,000 342,160 - - 342,160
- Tukang 2.632 - 2.632 Hok 120,000 315,840 - - 315,840
7.3 Pengecetan
- Pekerja 0.106 - 0.106 Hok 100,000 10,560 - - 10,560
- Tukang 0.333 - 0.333 Hok 120,000 39,917 - - 39,917
Sub Total 2) 11,473,301 - 4,575,624 6,897,677
Dibulatkan 11,473,300 - 4,575,600 6,897,600
Jumlah Total) #NAME? #NAME? #NAME? #NAME?
Palippu, Juni 2020

Disetujui Oleh : Dibuat Oleh :


Ketua DPMU Kabupaten Wajo KKM "PUNCAK" Fasilitator Masyarakat Pelaksana Pamsimas

( MUH. TAUFIQ, ST ) ( ABDUL HAMID ) ( ANDI ADRI ANSYA, ST ) ( MUH. YAHYA)


NIP : 19750717 2009 02 1003 Koordinator CF - WSS Ketua SATLAK
PERHITUNGAN RMH POMPA & GARDU LISTRIK

KEGIATAN P (m) L (m) T (m) Jumlah Volume

PEK. TANAH
1 Galian Pondasi
1.5 0.45 0.55 2 0.7425
1.2 0.45 0.55 2 0.594
TOT 1.3365

2 Urugan pasir
1.5 0.45 0.05 2 0.0675
1.2 0.45 0.05 2 0.054
1.13 1.13 0.05 1 0.063845
0.185345

3 Lantai kerja 10 cm
1.2 1.2 0.1 1 0.144

4 Pondasi batu gunung


1.5 0.325 0.55 2 0.53625
1.2 0.325 0.05 2 0.039
0.57525

PEK. BETON
5 Sloof 15/15
1.5 0.15 0.15 2 0.0675
1.2 0.15 0.15 2 0.054
TOT 0.1215

6 Kolom 15 x 15
0.15 0.15 1.73 2 0.07785
0.15 0.15 1.95 2 0.08775
TOT 0.1656

7 Ringbalk 15x15
1.5 0.15 0.15 2 0.0675
1.22 0.15 0.15 2 0.0549
TOT 0.1224
8 Dinding
1.2 1.9 2 4.56
1.2 1.73 1 2.076
0.3 0.15 1 0.045
1.2 1.95 1 2.34
1.95 0.78 1 1.521
TOT 7.41

14 PEK. PLESTERAN
14.82
kolom 0.519 0.585 1.104
Ringbalk 0.45 0.366 0.816
TOT 16.74

15 PENGECATAN TEMBOK 16.74

14 PEK. KUSEN PINTU


0.09 1.9 0.25 2 0.0855
0.07 0.78 0.25 1 0.01365
TOT 0.09915

PEK. DAUN PINTU 0.8 1.95 1 1.56

13 PEK. PENGECATAN KAYU 0.8 1.95 2 3.12

TOT 3.12

ROASTER 0.3 0.15 0.045

PEK. ATAP
14 GORDING
0.05 2.05 0.07 3 0.021525

15 KASO
0.05 2.2 0.07 3 0.0231

ATAP SENG 0.9 1.8 2 3.24


PERHITUNGAN RUMAH POMPA

P L T
1 Kolom 20 x 20
0.2 0.2 1.8 2 0.144
0.2 0.2 2.6 1 0.104
TOT 0.248

2 Dinding pas. Bata 1:3


0.28 1.8 1 0.504
0
1.38 2.1 1 2.898
0.15 0.3 2 0.09
1.18 1.8 1 2.124
1.78 2.1 1 1.869
TOT 7.305

6 Ringbalk 15/15
0.15 0.15 1.5 0
0.15 0.15 1.4 0
TOT 0

7 PLESTERAN DINDING RMH POMPA 7.553

13 PEK. PENGECATAN DINDING 7.553

13 PEK. PENGECATAN KAYU 0.8 1.8 2 2.88

TOT 2.88

14 PEK. KUSEN PINTU


0.09 1.9 0.25 2 0.0855
0.07 0.78 0.25 1 0.01365
TOT 0.09915

PEK. DAUN PINTU 0.8 1.8 1 1.44


ROASTER 0.3 0.15 0.045
PEK. ATAP
14 GORDING
0.05 2.5 0.07 3 0.02625

15 KASO
0.05 1.67 0.07 3 0.017535

16 LISTPLANK
4.17

17 PLAFOND
2.73 2.97 1 8.1081
0.6 2.97 1 1.782
TOT

18 PAS. SENG
2.5 1.67 1 4.175

Pjg pipa PVC


cm btg
2" 7.82 8

PERHITUNGAN TIANG DUDUKAN BOX PANEL


KEGIATAN P (m) L (m) T (m) Jumlah Volume

1 Galian pondasi 0.3 0.3 0.50 1 0.045


2 Pondasi 0.3 0.3 0.20 1 0.018
besi
3 Tiang 0.25 0.25 2.20 1 0.1375
PERHITUNGAN RESERVOIR

KEGIATAN P (m) L (m) T (m) Jumlah Volume

PEK. TANAH
1 Galian Pondasi 1.2 1.2 2 4 11.52

2 Urugan pasir 1.2 1.2 0.1 4 0.576

3 Lantai kerja (5 cm) 1.2 1.2 0.05 4 0.288

4 Urugan tanah kembali 7.236

PEK. BETON
5 Poer plat
1.2 1.2 0.5 4 2.88

6 Kolom 30 x 30 (dibawah permukaan tanah)


0.3 0.3 1.5 4 0.54

7 Kolom 30 x 30 (diatas permukaan tanah)


0.3 0.3 7 4 2.52

Kolom bak 20 x 20
0.2 0.2 2.5 6 0.6

8 Sloof/ringbalk 20 x 30
0.2 2.4 0.3 16 2.304
0
TOT 2.304

9 Ringbalk 20 x 20
0.2 2.4 0.2 2 0.192

10 Plat bawah t = 20 cm
2.4 2.4 0.2 1 1.152
TOT 1.152

12 Dinding bak
2.4 0.2 2.5 4 4.8
0
TOT 4.8

13 Plat atas (penutup bak)


1.6 2.4 0.12 1 0.4608
1.6 1.6 0.12 1 0.192
TOT 0.2688

14 Balok tengah dibawah plat Penutup (15x20)


0.15 3.4 0.5 1 0.255
0.15 3.25 0.5 1 0.24375
TOT 0.49875

15 PEK. PLESTERAN
a Kolom 30 x 30
0.3 4 16 19.2
0.2 0.4 32 2.56
TOT 16.64

b Sloof/ringbalk
2.6 0.4 12 12.48
2.6 0.2 12 6.24
0.2 0.2 4 0.16
TOT 18.56

d Dinding bak luar


2.4 2.5 4 24

d Dinding bak dalam


2.2 2.2 4 19.36

e Dibawah Plat lantai


0

TOTAL PEK. PLESTERAN 78.56

16 PEK. ACIAN 43.36

17 PEK. PENGECATAN 78.56

HARGA HARGA
SATUAN VOLUME SATUAN TOTAL
( Rp ) ( Rp )
GIP Ø 1" M 9.81 35,833 351,525
Ongkos Kerja (Pengelasan) Ls 1.00 500,000 500,000

TOTAL
DIBULATKAN

PERHITUNGAN BOX VALVE

KEGIATAN P (m) L (m) T (m) Jumlah Volume

PEK. TANAH
1 Galian 0.5 0.5 0.6 3 0.45

2 Pas. Bata 1 : 4 0.5 0.6 4 1.2


0.5 0.50 1 0.25
TOT 1.45
3 Plesteran 2.65
4 Penutup manhole

cm Batang
Pjg pipa 2" 2" AKSESORIS
GIP Trans 8 Transmisi
Distribusi 14
6.82
penguras 0.5
Distribusi
PVC Trans 0.5
Distribusi 1
penguras 0.5

TOTAL GIP 29.32 30 Penguras


PVC 2 2

TOTAL PIPA AKSESORIS


GIP #REF!
PVC #REF!
0.044625
0.043785
DIMENSI BAK 2 x 2 x 2.5
2.5 2 2.5
12.5

3.06
HARGA
TOTAL
( Rp )
351,525
500,000

851,525
851,500
TOTAL AKSESORIS
Knee gip 2" 1 Knee gip 2" 4
Socket 2" 1 Socket 2" 4
Drat dalam 1 Drat dalam 4
Gate valve 3
Knee gip 2" 2 Knee PVC 2" 3
Socket 2" 2 Pek. Drat 12
Drat dalam 2
Gate valve 2
Knee PVC 2" 2

Knee gip 2" 1


Socket 2" 1
Drat dalam 1
Gate valve 1
Knee PVC 2" 1
Pek. Drat 12

Knee gip 2" #REF!


Socket 2" 4
Drat dalam #REF!
Gate valve #REF!
Pek. Drat #REF!
Knee PVC 2" #REF!
drat luar 2" #REF!
Cap 2" #REF!
drat dalam 2" #REF!
RENCANA ANGGARAN BIAYA
Provinsi/Kabupaten-Kota/Kecamatan/Desa : Sulawesi Selatan/Wajo/Pitumpanua/Batu
Nomor RAB : Sub pekerjaan/Kegiatan : Reservoir
Pekerjaan Kegiatan : Sarana Air Minum Ukuran/Dimensi : 2 x 2 x 2.5 m
Kapasitas : 10 m³
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN APBDES Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5+6 3 4 5 6 7 8 9=2x8 10=3x8 11=4x8 12=5x8
A. PEKERJAAN PENDAHULUAN
1.1 Pemasangan Bowplank 12.80
- Kayu klas III uk. 5/7 0.180 0.180 - M³ 3,682,000 662,760 - 662,760 -
- Paku biasa 2" - 5" 0.256 0.256 - Kg 22,000 5,632 - 5,632 -
- Kayu papan kls. III 3/20 0.090 0.090 - M³ 3,244,000 290,662 - 290,662 -
B. PEKERJAAN TANAH
2.1 Urugan Pasir 0.900
- Pasir urug 1.080 1.080 - M³ 242,000 261,360 - - 261,360
C. PEKERJAAN BETON
3.1 Lantai Kerja t. 5 cm 0.450
- Semen Portland 103.500 103.500 - M³ 1,340 138,690 - - 138,690
- Pasir beton 0.287 0.287 - M³ 306,000 87,833 - - 87,833
- Batu pecah 2/3 cm 0.342 0.342 - M³ 591,000 202,319 - - 202,319
3.2 Pondasi Poor Plat 1,5 x 1,5 -
* Beton 4.500 -
- Semen portland 1,467.000 1,467.000 - Kg 1,340 1,965,780 - - 1,965,780
- Pasir Beton 2.443 2.443 - M³ 306,000 747,514 - - 747,514
- Batu pecah 2/3 cm 3.430 3.430 - M³ 591,000 2,027,130 - - 2,027,130
* Pembesian 230.400
- Besi beton Polos Ø 14 241.920 241.920 - Kg 10,331 2,499,174 - - 2,499,174
- Kawat beton 3.456 3.456 - Kg 23,000 79,488 - - 79,488
* Bekisting 4.800
- Kayu kls. III 0.192 0.192 - M³ 3,682,000 706,944 - 706,944 -
- Paku biasa 2" - 5" 1.440 1.440 - Kg 22,000 31,680 - - 31,680
3.3 Kolom 40x40
* Beton 1.980
- Semen portland 645.480 645.480 - Kg 1,340 864,943 - - 864,943
- Pasir Beton 1.075 1.075 - M³ 306,000 328,906 - - 328,906
- Batu pecah 2/3 cm 1.509 1.509 - M³ 591,000 891,937 - 891,937
* Pembesian 339.800
- Besi beton Polos Ø 14 188.160 188.160 - Kg 15,840 2,980,496 - - 2,980,496
- Besi beton Polos Ø 8 168.630 168.630 - Kg 15,823 2,668,196 - - 2,668,196
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN APBDES Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5+6 3 4 5 6 7 8 9=2x8 10=3x8 11=4x8 12=5x8
- Kawat beton 5.097 5.097 - Kg 23,000 117,231 - - 117,231
* Bekisting 14.400
- Kayu Kls. III - - - - M³ - - - -
- Paku biasa 2" - 5" 5.760 5.760 - Kg 22,000 126,720 - - 126,720
- Balok Kayu Kls. II 0.216 0.216 - M³ 3,682,000 795,312 - 795,312
- Tripleks 9 mm 5.040 5.040 - Lbr 110,000 554,400 - - 554,400
- Bambu 21.600 21.600 - Btg 31,000 669,600 - 669,600 -
3.4 Kolom 20x20 K2
* Beton 0.600
- Semen portland 195.600 195.600 - Kg 1,340 262,104 - - 262,104
- Pasir Beton 0.326 0.326 - M³ 306,000 99,669 - - 99,669
- Batu pecah 2/3 cm 0.457 0.457 - M³ 591,000 270,284 - 270,284
* Pembesian 43.420
- Besi beton Polos Ø 12 43.008 43.008 - Kg 15,860 682,090 - - 682,090
- Besi beton Polos Ø 8 2.583 2.583 - Kg 15,823 40,870 - - 40,870
- Kawat beton 0.651 0.651 Kg 23,000 14,980 - - 14,980
* Bekisting 2.453
- Kayu Kls. III - - - - M³ - - - -
- Paku biasa 2" - 5" 0.981 0.981 - Kg 22,000 21,589 - - 21,589
- Balok Kayu Kls. III 0.037 0.037 - M³ 3,682,000 135,498 - 135,498 -
- Tripleks 9 mm 0.859 0.859 - Lbr 110,000 94,453 - - 94,453
- Bambu 4.907 4.907 - Btg 31,000 152,107 - 152,107 -
3.7 Balok 20 x 30 ( S1 ) - -
* Beton 2.304 -
- Semen portland 751.104 751.104 - Kg 1,340 1,006,479 - - 1,006,479
- Pasir Beton 1.251 1.251 - M³ 306,000 382,727 - - 382,727
- Batu pecah 2/3 cm 1.756 1.756 - M³ 591,000 1,037,891 - - 1,037,891
* Pembesian 332.880
- Besi beton Polos Ø 14 185.976 185.976 - Kg 15,840 2,945,901 - - 2,945,901
- Besi beton Polos Ø 8 163.548 163.548 - Kg 15,823 2,587,785 - - 2,587,785
- Kawat beton 4.993 4.993 Kg 23,000 114,844 - - 114,844
* Bekisting 3.600
- Kayu Kls. III - - - - M³ - - - -
- Paku biasa 2" - 5" 1.440 1.440 - Kg 22,000 31,680 - - 31,680
- Balok Kayu Kls. II 0.065 0.065 - M³ 3,682,000 238,594 - 238,594 -
- Tripleks 9 mm 1.260 1.260 - Lbr 110,000 138,600 - - 138,600
- Bambu 7.200 7.200 - Btg 31,000 223,200 - 223,200 -
3.8 Ringbalk 20 x 25 ( RB2 ) - -
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN APBDES Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5+6 3 4 5 6 7 8 9=2x8 10=3x8 11=4x8 12=5x8
* Beton 0.192 -
- Semen portland 62.592 62.592 - Kg 1,340 83,873 - - 83,873
- Pasir Beton 0.104 0.104 - M³ 306,000 31,894 - - 31,894
- Batu pecah 2/3 cm 0.146 0.146 - M³ 591,000 86,491 - - 86,491
* Pembesian 38.560 -
- Besi beton Polos Ø 12 20.664 20.664 - Kg 15,860 327,723 - - 327,723
- Besi beton Polos Ø 8 19.824 19.824 - Kg 15,823 313,671 - - 313,671
- Kawat beton 0.578 0.578 - Kg 23,000 13,303 - - 13,303
Volume Harga Biaya (Rp)
URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN APBDES Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5+6 3 4 5 6 7 8 9=2x8 10=3x8 11=4x8 12=5x8
* Bekisting 2.000 -
- Kayu Kls. III - - - - M³ - - - -
- Paku biasa 2" - 5" 0.800 0.800 - Kg 22,000 17,600 - - 17,600
- Balok Kayu Kls. II 0.030 0.030 - M³ 3,682,000 110,460 - - 110,460
- Tripleks 9 mm 0.700 0.700 - Lbr - - - -
- Bambu 12.000 12.000 - Btg 31,000 372,000 - 372,000
3.9 Plat Lantai t. 20 cm -
* Beton 1.152 -
- Semen portland 375.552 375.552 - Kg 1,340 503,240 - - 503,240
- Pasir Beton 0.625 0.625 - M³ 306,000 191,364 - - 191,364
- Batu pecah 2/3 cm 0.878 0.878 - M³ 591,000 518,945 - - 518,945
* Pembesian 118.080 -
- Besi beton Polos Ø 12 123.984 123.984 - Kg 15,860 1,966,338 - - 1,966,338
- Kawat beton 1.771 1.771 - Kg 23,000 40,738 - - 40,738
* Bekisting 4.267 -
- Kayu Kls. III - - M³ - - - -
- Paku biasa 2" - 5" 1.707 1.707 - Kg 22,000 37,547 - - 37,547
- Balok Kayu Kls. II 0.064 0.064 - M³ 3,682,000 235,648 - 235,648 -
- Tripleks 9 mm 1.493 1.493 - Lbr 110,000 164,267 - - 164,267
- Bambu 25.600 25.600 - Btg 31,000 793,600 - 793,600

Tandon 2200 4.000 4.000 bh 3,500,000 14,000,000 14,000,000


Seng Gelombang Besar 31.000 31.000 bh 53,000 1,643,000 1,643,000
Besi Hollow 9.000 9.000 btng 200,000 1,800,000 1,800,000
D. PEKERJAAN FINISHING -
4.1 Plesteran 78.560 -
- Semen Portland 814.510 814.510 - Kg 1,340 1,091,444 - - 1,091,444
- Pasir pasang 2.435 2.435 - M³ 242,000 589,357 - - 589,357
4.2 Acian 43.360
- Semen Portland 140.920 140.920 - Kg 1,340 188,833 - - 188,833
4.3 Pekerjaan Man Hole 80 x 80 -
- Penutup Man Hole Besi Plat 80 x 80 - - Ls 900,000 - - - -
4.4 Pipa Vent Gip Ø 1 1/2" -
- Pipa Vent Gip Ø 1 1/2" - - Ls 559,000 - - - -
4.5 Pengecatan 78.560 -
- Plamir tembok 7.856 7.856 - Kg 9,000 70,704 - - 70,704
- Cat dasar 7.856 7.856 - Kg 105,000 824,880 - - 824,880
- Cat tembok 20.426 20.426 - Kg 105,000 2,144,688 - - 2,144,688
4.6 Tangga Monyet
Tangga Monyet Pipa GIP Ø ¾" 1.000 1.000 - Ls 2,000,000 2,000,000 - - 2,000,000
RENCANA ANGGARAN BIAYA
#REF!
Nomor RAB : 04 Sub pekerjaan/Kegiatan : Aksesoris Bor
Pekerjaan Kegiatan : Sarana Air Minum Dimensi : 8

Volume Harga Biaya (Rp)


URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBN Total
inCash inKind Rp inCash inKind
1 M 2=3+4+5 3 M 4 M 5 M 6 M 7 8=2x7 9=3x7 10=4x7
A. BAHAN
1.2 Pipa PVC SNI
Pipa PVC AW Ø 50 - 1 1/2" 8 8.00 Btg 80,000 640,000 - -
M' -
Sub Total 640,000 - -
B. ASSESORIS PIPA
2.1 Assesoris Pipa GIP
- Knee Gip 45" 1 1/2" 2 - - 2 Bh 56,000 112,000 - -
- Knee Gip 90" 1 1/2" 1 - - 1 Bh 40,000 40,000 - -
- Chek Valve 1 1/2" 1 - - 1 Bh 350,000 350,000 - -
- Gate Valve 1 1/2" 1 - - 1 Bh 300,000 300,000 - -
- Presure 1 1/2" - - - Bh 150,000 - - -
-Water Mor 1 1/2" 1 - - 1 Bh 81,000 81,000 - -
- Tali Tambang 28 - - 28 M' 16,000 448,000 - -
- Double Neeple 1 1/2" 5 5 Bh 37,000 185,000 - -
2.2 Assesoris Pipa PVC SNI
- Scoket Drat Luar PVC 1 1/2" 2 - - 2 Bh 15,000 30,000 - -

Sub Total 1,546,000 - -


Jumlah Total 2,186,000 - -
Dibulatkan 2,186,000 - -
mattirowalie juni 2020

Disetujui Oleh : Dibuat Oleh :


Ketua DPMU Kabupaten Wajo KKM Fasilitator Masyarakat Pelaksana Pamsimas

#REF! #REF! #REF! #REF!


#REF! #REF! FM - WSS Ketua SATLAK
RENCANA ANGGARAN BIAYA
#REF!

Batang

Biaya (Rp)

APBN

11=5x7

640,000
-
640,000

112,000
40,000
350,000
300,000
-
81,000
448,000
185,000

30,000

1,546,000
2,186,000
2,186,000
mattirowalie juni 2020

Pelaksana Pamsimas

#REF!
RENCANA ANGGARAN BIAYA

Jenis Kegiatan : Pembangunan Sarana Air Minum Sub pekerjaan/Kegiatan : Pengeboran Air Tanah Dalam
Nomor RAB : 03 Ukuran / Dimensi : 40 Meter
Lokasi Kegiatan : Desa Sappa Kabupaten : Wajo
HARGA SATUAN TOTAL HARGA
NO URAIAN VOLUME SATUAN
Rp Rp
1 PENGADAAN APD
1 Pengadaan Masker Untuk Tukang dan Pekerja Bh 10,000 -
2 Pengadaan Kaos Tangan Untuk Tukang dan Pekerja Bh 10,000 -
-
1. PEKERJAAN GEOLISTRIK 1 Ls 3,000,000.00 3,000,000.00
SUB TOTAL 1 3,000,000.00
2. PENGADAAN BAHAN
1 Pengadaan Pipa blank dan Pipa Screen PVC AW Ø 4'' 35 M' 73,000 2,555,000.00
2 Pengadaan dop PVC Ø 4" 1 Bh 100,000 100,000.00
3 Pengadaan dan pemasangan tutup sumur Ø 4'' 1 Bh 1,000,000 1,000,000.00
4 Pengadaan gravel pack 0.5 M3 300,000 150,000.00

SUB TOTAL 2 3,805,000


3. UPAH DAN BIAYA KONSTRUKSI
1 Pengeboran Segala Formasi 35 M' 45,000 1,575,000.00
2 Pelebaran lubang bor (reaming) dari Ø 2'' menjadi Ø4' 35 M' 170,000 5,950,000.00
3 Pembersihan lubang dengan sirkulasi lumpur 1 Lokasi 320,000 320,000.00
4 Pemasangan Pipa blank, pipa screen PVC SNI Ø 4'' & Dop PVC 35 M' 37,000 1,295,000.00
5 Pekerjaan pengisian gravel pack 0.5 M3 50,000 25,000.00
6 Water jetting develoment : 1 Lokasi 350,000 350,000.00
7 Air jetting develoment : 1 Lokasi 350,000 350,000.00
8 Pekerjaan sementing mortal dan pondasi ( Lantai beton) 1 M3 480,000 480,000.00
9 Pemompaan uji meliputi :
a. Uji debit tetap (Long priode test) 24 Jam 7,000 168,000.00
b. Uji Pemulihan (Recovery) 24 Jam 7,000 168,000.00
SUB TOTAL 3 10,681,000
JUMLAH TOTAL 17,486,000
DIBULATKAN 17,486,000

Mario, Juni 2020

Disetujui Oleh : Dibuat Oleh :

Ketua DPMU Kabupaten Wajo KKM "PUNCAK" Fasilitator Masyarakat Pelaksana Pamsimas

( MUH. TAUFIQ, ST ) ( ABDUL HAMID ) (GULBUDIN HEMATIAR, ST ) ( MUH. YAHYA)


NIP : 19750717 2009 02 1003 Koordinator FM - WSS Ketua SATLAK
RENCANA ANGGARAN BIAYA

Nomor RAB : 07 Sub pekerjaan/Kegiatan : Pengadaan Pompa Submersible


Pekerjaan Kegiatan : Pembangunan SAB Ukuran/dimensi : 1 Paket

Volume Harga Biaya (Rp)


URAIAN Kontribusi Masy. Satuan Satuan Kontribusi Masy.
Total APBN Total APBN
inCash inKind Rp inCash inKind
1 2=3+4+5 3 4 5 6 7 8=2x7 9=3x7 10=4x7 11=5x7
I. BAHAN
- Pompa (Reservoir)
1.1 Submersible Pump (SP) 1.00 - - 1.00 Set 3,700,000 3,700,000 - - 3,700,000
- Kapasitas 0,75 - 1,2 Ltr/s
- Head 100 m
- Diameter pipa Outlet 11/2"
- Daya 2200 watt
1.2 Control Panel 1.00 1.00 Bh 2,500,000 2,500,000 - - 2,500,000
1.4 Kabel Otomatis Pompa 1.00 - - 1.00 Rol 1,500,000 1,500,000 - - 1,500,000
Otomatis Pompa 1.00 - - 1.00 Bh 150,000 150,000 - - 150,000
1.5 Drop Cable Water level Control 1.00 - - 1.00 Rol 1,500,000 1,500,000 - - 1,500,000
Sub Total 1) 9,350,000 - - 9,350,000
2. UPAH
- Biaya Pemasangan Pompa 1.00 - - 1.00 Ls 500,000 500,000 - - 500,000
Sub Total 2) 500,000 - - 500,000
Jumlah Total 9,850,000 - - 9,850,000

Palippu, Juni 2020

Disetujui Oleh : Dibuat Oleh :


Ketua DPMU Kabupaten Wajo KKM "PUNCAK" Fasilitator Masyarakat Pelaksana Pamsimas
MUH. TAUFIQ, ST ( ABDUL HAMID ) (GULBUDIN HEMATIAR, ST ) ( MUH. YAHYA)
Nip. 19750717 2009 02 1003 Koordinator FM - WSS Ketua SATLAK
RENCANA PENGGUNAAN DANA ( RPD )
DESA PALIPPU/KEC.TANASITOLO/KAB.WAJO
ATK,OPERASIONAL,KELEMBAGAAN DAN KESEHATA

Volume

Kebutuha

s/d tahap
yang lalu
Realisasi
No Uraian Pekerjaan

n
1 PENGADAAN APD
Pengadaan Masker Untuk Tukang dan Pekerja 18.00
Pengadaan Kaos Tangan Untuk Tukang dan Pekerja 18.00
Pengadaan Termometer Gun 1.00
Pengadaan Desinfektan 3.00

2 RESERVOIR
Bambu 72
Batu pecah 2/3 cm 11
Besi beton Polos Ø 10 5
Besi beton Polos Ø 12 22
Besi beton Polos Ø 14 80
Besi beton Polos Ø 8 59
Kawat beton 26.00
Paku biasa 2" - 5" 20.285
Pasir beton 14
Pasir pasang 8
Pasir urug 1
Semen Portland 132
Tripleks 6 mm 0
Tripleks 9 mm 17

upah
pekerja 161
tukang 49
3 GARDU LISTRIK
Paku biasa 2" - 5" 1
Pasir urug 1
Batu belah 15/20 cm 2
Semen Portland 10
Pasir pasang 2
Pasir Beton 0.224
Batu pecah 2/3 cm 0.158
Kayu terentang 2
Besi beton polos 8
Besi beton Polos Ø 10 5
Kawat beton 3.50
Koral beton 0.866
Kusen Pintu 1
Engsel Kupu kupu 3
Kunci Tanam 1
Bata merah 711
Daun Pintu 1

4 CPTS
Pasir Urug 1
Batu Kali 1
Semen Portland 8
Pasir Pasang 1
Pasir beton 1
Koral beton 1
Kayu terentang 1
Paku biasa 2" - 5' 0.3075
Besi beton polos 5
Kawat beton 0.00
Bata merah 5 x 11 x 22 cm 110
Pipa PVC Ø 1/2" 8
Sok Drak Luar 1/2" 1
Knee 1/2" 2
Stop Kran Air Ø 1/2" 1
Seal Type 1
Wastafel 1
Pipa PVC Ø 1" 1
Besi hollow 4 x 4 mm 21
Pengelasan 21
Besi Siku 19
Tangki Air 250 Liter 1
Batu Kerikil Sungai 0.0975
5 BOR
PENGADAAN APD
Pengadaan Masker Untuk Tukang dan Pekerja 0
Pengadaan Kaos Tangan Untuk Tukang dan Pekerja 0

1. PEKERJAAN GEOLISTRIK 1

2. PENGADAAN BAHAN
Pengadaan Pipa blank dan Pipa Screen PVC AW Ø 4'' 35
Pengadaan dop PVC Ø 4" 1
Pengadaan dan pemasangan tutup sumur Ø 4'' 1
Pengadaan gravel pack 0.5

3. UPAH DAN BIAYA KONSTRUKSI


Pengeboran Segala Formasi 35
Pelebaran lubang bor (reaming) dari Ø 2'' menjadi Ø4' 35
Pembersihan lubang dengan sirkulasi lumpur 1
Pemasangan Pipa blank, pipa screen PVC SNI Ø 4'' & Dop PVC 35
Pekerjaan pengisian gravel pack 0.5
Water jetting develoment : 1
Air jetting develoment : 1
Pekerjaan sementing mortal dan pondasi ( Lantai beton) 1
Pemompaan uji meliputi :
a. Uji debit tetap (Long priode test) 24
b. Uji Pemulihan (Recovery) 24

6 POMPA
I. BAHAN
- Pompa (Reservoir)
1.1 Submersible Pump (SP) 1
- Kapasitas 0,75 - 1,2 Ltr/s
- Head 100 m
- Diameter pipa Outlet 11/2"
- Daya 2200 watt
1.2 Control Panel 1
1.4 Kabel Otomatis Pompa 1
Otomatis Pompa 1
Drop Cable Water level Control 1
1.5 2. UPAH
Biaya Pemasangan Pompa 1

LISTRIK PLN
1. BAHAN
- INSTALASI JARINGAN LISTRIK PLN
Biaya Penyambungan (BP) 1
Biaya Surat Jaminan Instalasi (SJI) 1
Biaya Gambar 1
Sertifikat Layak Operasi (SLO) 1
Cable 2x16 mm 80
2. UPAH
Pemasangan Instalasi 1

1 ATK dan OPERASIONAL


A. Pembelian ATK
1 Kertas HVS F4/A4 4 0
2 Materai 6000 15 0
3 Tinta printer warna hitam 1 0
4 Tinta printer warna biru 1 0
5 Tinta printer warna kuning 1 0
6 Tinta printer warna merah 1 0
7 Ballpoint 1 0
8 Spidol besar 6 0
9 Buku tulis besar 6 0
10 Steples sedang 1 0
11 Isi steples sedang 4 0
12 Lem kertas fox 1 0
13 Kalkulator 1 0
14 Stempel KKM 1 0
15 Bantalan Stempel 1 0
16 Map plastik 4 0
17 Tipe-ex 1 0
18 Lakban 2 0

B. Transportasi Kegiatan
1 Transportasi pencairan dana Bank 2 0
2 Transportasi Konsultasi ke DPMU 3 0
3 Transporasi kegiatan lapangan dll 4 0

C. Pembuatan Dokumen dll


1 Konsumsi rapat KKM & Satlak 4 0
2 Dokumentasi kegiatan 4 0
3 Papan Informasi 1 0
4 Papan Program 1 0
5 Penggandaan RKM 7 0
6 Pembuatan laporan akhir 3 0

Total (A+B+C+D)
2 KEGIATAN PENGUATAN KELEMBAGAAN
A. Pelatihan Administrasi & Keuangan
1 Ballpoint 5 0
2 Buku tulis/block note 5 0
3 Spidol 1 0
4 Kertas plano 4 0
5 Fotocopy Modul 150 0
6 Handzanitizer 1 0
7 Masker kain 5 0
8 Spanduk pelatihan 1 0
9 Nasi Dos/snack 5 0

B. Pelatihan Teknik
1 Ballpoint 5 0
2 Buku tulis/block note 5 0
3 Spidol 1 0
4 Kertas plano 5 0
5 Fotocopy Modul 150 0
6 Handsanitizer 1 0
7 Masker kain 5 0
8 Nasi Dos/snack 5 0

C. Pelatihan Kesehatan
1 Ballpoint 5 0
2 Buku tulis/block note 5 0
3 Spidol 1 0
4 Kertas plano 5 0
5 Fotocopy Modul 150 0
6 Handsanitizer 1 0
7 Masker kain 5 0
8 Spanduk pelatihan 1 0
9 Nasi Dos/snack 5

Total (A+B+C)
3 KEGIATAN KESEHATAN
A. Penyuluhan PHBS Masyarakat
1 Spidol 1 0
2 Lakban Kertas 1 0
3 Gambar Poster kesehatan 2 0

B. Pembuatan papan reklame pesan sehat


1 Papan Reklame 2 0

C. Simulasi CTPS
Ember Berkran 1 0
Sabun Cuci tangan 1 0
Lap Tangan 1 0

D. Pembuatan Poster Kesehatan


1 Poster Kertas 10 0

E. Penyuluhan PHBS Sekolah


1 Spidol 1 0
2 Poster Kesehatan 5 0

F. Simulasi CTPS
1 Ember berkran 1 0
2 Sabun Cuci Tangan 1 0
3 Lap Tangan 1 0

G. Pengadaan Poster Sekolah


1 Bingkai poster dan Poster 10 0

H. Pemeriksaan kwalitas air


1 Pemeriksaan (Fisik)
Suhu 2 0
Pemeriksaan Bau 2 0
2 Pemeriksaan (Kimiawi)
Besi (Fe) 2 0
Derajat Keasaman (pH) 2 0
Mangan (Mn) 2 0
Nitrit (NO2) 2 0
Nitrat (NO3) 2 0
Seng (Zn) 2 0
Kesadahan (CACO3) 2 0
Sulfat (SO4) 2 0
3 Pemeriksaan (mikrobiologi)
Coliform tinja 2 0
Total Coliform 2 0

Total (A+B+C+D+E+F+G+H)

Jumlah pengajuan (1+2+3+4)


( Seratus dua puluh dua juta lima ratus ribu rupiah)

Disetujui :
Koordinator KKM Puncak

Abd. Hamid

Diperiksa Oleh :

No Nama Selaku
1 Asniati, SKM Fasilitator masyarakat CD
2 Ida Kartini, SKM Fasilitator masyarakat CD
3 Aradea Yusuf,ST District Coordinator
4 Rita Darniati, SE FMS Provinsi

Mengetahui :

Pejabat Pembuat Komitmen Air Minum


Satker Pelaksanaan Prasarana Permukiman
Provinsi Sulawesi Selatan
( AMOS LIMBU TULAK, ST )
Nip.19740923 200911 1 001
NGGUNAAN DANA ( RPD )
KEC.TANASITOLO/KAB.WAJO
KELEMBAGAAN DAN KESEHATAN

RPD :1

Volume
Komulatif
Pengajuan

Jumlah
Sekarang

unit /
Sisa Harga Satuan Jumlah
Satuan

18.00 bh Rp 10,000 Rp 180,000


18.00 bh Rp 10,000 Rp 180,000
1.00 bh Rp 1,000,000 Rp 1,000,000
3.00 liter Rp 120,000 Rp 360,000
Rp 1,720,000

72 0 bt Rp 31,000 Rp 2,232,000
11 0 m³ Rp 591,000 Rp 6,501,000
20 -15 btg Rp 60,000 Rp 1,200,000
50 -28 btg Rp 85,000 Rp 4,250,000
80 0 btg Rp 135,000 Rp 10,800,000
59 0 btg Rp 40,000 Rp 2,360,000
34.05 -8.05 kg Rp 23,000 Rp 783,035
20.285 0 kg Rp 22,000 Rp 446,270
14 0 m³ Rp 306,000 Rp 4,284,000
8 0 m³ Rp 242,000 Rp 1,936,000
1 0 m³ Rp 242,000 Rp 242,000
132 0 zak Rp 65,000 Rp 8,580,000
0 0 Rp 80,000 Rp -
17 0 Rp 110,000 Rp 1,870,000
Rp 45,484,305

30 100,000 Rp 3,000,000
20 120,000 Rp 2,400,000
Rp 5,400,000
1 Rp 22,000 Rp 22,000
1 Rp 242,000 Rp 242,000
2 Rp 395,000 Rp 790,000
10 Rp 65,000 Rp 650,000
2 Rp 242,000 Rp 484,000
0.224 Rp 306,000 Rp 68,544
0.158 Rp 505,000 Rp 79,790
2 Rp 26,000 Rp 52,000
8 Rp 40,000 Rp 320,000
5 Rp 60,000 Rp 300,000
3.4975 Rp 23,000 Rp 80,443
0.866 Rp 591,000 Rp 511,806
1 Rp 668,000 Rp 668,000
3 Rp 39,000 Rp 117,000
1 Rp 223,000 Rp 223,000
711 Rp 1,000 Rp 711,000
1 Rp 757,000 Rp 757,000
Rp 6,076,583

1 Rp 242,000 Rp 242,000
1 Rp 395,000 Rp 395,000
8 Rp 65,000 Rp 520,000
1 Rp 242,000 Rp 242,000
1 Rp 306,000 Rp 306,000
1 Rp 613,000 Rp 613,000
1 Rp 40,000 Rp 40,000
0.3075 Rp 6,765 Rp 2,080
5 Rp 40,000 Rp 200,000
0 Rp 22,000 Rp -
110 Rp 1,000 Rp 110,000
8 Rp 17,500 Rp 140,000
1 Rp 2,000 Rp 2,000
2 Rp 2,000 Rp 4,000
1 Rp 25,000 Rp 25,000
1 Rp 5,000 Rp 5,000
1 Rp 815,000 Rp 815,000
1 Rp 40,000 Rp 40,000
21 Rp 18,167 Rp 381,500
21 Rp 1,350 Rp 28,350
19 Rp 20,000 Rp 380,000
1 Rp 500,000 Rp 500,000
0.0975 Rp 613,000 Rp 59,768
Rp 10,101,395

0 10000 0
0 10000 0
sub total 1 0
1 3000000 3000000
sub total 2 3000000

35 73000 2555000
1 100000 100000
1 1000000 1000000
0.5 300000 150000
sub total 3 3805000

35 45000 1575000
35 170000 5950000
1 320000 320000
35 37000 1295000
0.5 50000 25000
1 350000 350000
1 350000 350000
1 480000 480000

24 7000 168000
24 7000 168000
subtotal 4 10681000
total (1+2+3+4) 17486000

1 3700000 3700000

1 2500000 2500000
1 1500000 1500000
1 150000 150000
1 1500000 1500000

1 500000 500000
Rp 9,850,000

1 2712000 2712000
1 1750000 1750000
1 724000 724000
1 100000 100000
80 7,500 600000

1 250,000 250000
total Rp 6,136,000

4 4 rim 55,000 220,000


15 15 buah 7,000 105,000
1 1 Botol 100,000 100,000
1 1 Botol 100,000 100,000
1 1 Botol 100,000 100,000
1 1 Botol 100,000 100,000
1 1 dos 25,000 25,000
6 6 buah 8,000 48,000
6 6 buah 15,000 90,000
1 1 buah 20,000 20,000
4 4 buah 2,000 8,000
1 1 buah 10,000 10,000
1 1 buah 75,000 75,000
1 1 buah 80,000 80,000
1 1 buah 10,000 10,000
4 4 buah 2,500 10,000
1 1 buah 20,000 20,000
2 2 buah 12,500 25,000
Sub total A 1,146,000

1 1 kali 150,000 150,000


1 1 kali 210,000 210,000
2 2 kali 500,000 1,000,000
Sub total B 1,360,000

2 2 kali 100,000 200,000


1 1 bulan 50,000 50,000
1 1 buah 250,000 250,000
1 1 buah 150,000 150,000
1 1 rangkap 100,000 100,000
7 7 rangkap 100,000 700,000
Sub total C 1,450,000
D) 3,956,000

5 5 buah 3,500 17,500


5 5 buah 5,000 25,000
1 1 buah 8,000 8,000
4 4 buah 2,500 10,000
150 150 lbr 300 45,000
1 1 buah 20,000 20,000
5 5 buah 10,000 50,000
1 1 buah 50,000 50,000
5 5 dos 20,000 100,000
Sub total A 325,500

5 5 buah 3,000 15,000


5 5 buah 5,000 25,000
1 1 buah 8,000 8,000
5 5 buah 2,500 12,500
150 150 lbr 300 45,000
1 1 botol 20,000 20,000
5 5 buah 10,000 50,000
5 5 dos 20,000 100,000
Sub Total B 275,500

5 5 Buah 3,500 17,500


5 5 buah 5,000 25,000
1 1 Buah 8,000 8,000
5 5 Buah 2,500 12,500
150 150 lbr 300 45,000
1 1 buah 20,000 20,000
5 5 buah 10,000 50,000
1 1 buah 50,000 50,000
5 dos 20,000 100,000
Sub Total C 328,000
929,000

1 1 buah 8,000 8,000


1 1 buah 12,500 12,500
2 2 buah 25,000 50,000
Sub Total A 70,500

2 2 buah 1,500,000 3,000,000


Sub Total B 3,000,000

1 1 buah 80,000 80,000


1 1 buah 15,000 15,000
1 1 buah 5,000 5,000
Sub Total C 100,000

10 10 buah 25,000 250,000


Sub Total D 250,000

1 1 buah 8,000 8,000


5 5 botol 25,000 125,000
Sub Total E 133,000

1 1 buah 80,000 80,000


1 1 buah 15,000 15,000
1 1 buah 5,000 5,000
Sub Total F 100,000

10 10 buah 100,000 1,000,000


Sub Total G 1,000,000

1 1 5,000 5,000
1 1 12,000 12,000

1 1 25,000 25,000
1 1 10,000 10,000
1 1 30,000 30,000
1 1 20,000 20,000
1 1 20,000 20,000
1 1 30,000 30,000
1 1 20,000 20,000
1 1 30,000 30,000

1 1 20,000 20,000
1 1 20,000 20,000
Sub Total H 242,000
+G+H) 4,795,500

+2+3+4)
111,005,783
a ratus ribu rupiah)

Palippu, Juli 2020

Dibuat :
Ketua Satlak Pamsimas

Muhammad Yahya

Diperiksa Oleh :

Selaku Tanda Tangan


ilitator masyarakat CD
ilitator masyarakat CD
District Coordinator
FMS Provinsi

n Air Minum
a Permukiman
latan
K, ST )
1 1 001
Rp 11,494,217

Rp 102,254,283